<response><row><row _id="row-um6u.5k42~vyny" _uuid="00000000-0000-0000-0A3C-C09390889486" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-um6u.5k42~vyny"><intent_id>501535</intent_id><project_id>683213</project_id><text_data>Janitorial Services Provided.</text_data><comment_date>2013-02-13T00:00:00</comment_date></row><row _id="row-9mgh-es7s.edum" _uuid="00000000-0000-0000-EF52-F198B5218002" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9mgh-es7s.edum"><intent_id>930072</intent_id><project_id>860357</project_id><text_data>Installation of indoor telephone telecommunications cabling</text_data><comment_date>2018-08-31T00:00:00</comment_date></row><row _id="row-syc6~4tn4.japw" _uuid="00000000-0000-0000-93C8-4E87C941F9C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-syc6~4tn4.japw"><intent_id>1030349</intent_id><project_id>883904</project_id><text_data>Blythe Job #W-403See also Intent 985396 for Blythe's work performed prior to 8/2/2019 rebranding/renaming/re-licensingthis Intent for work performed 8/2/2019 or later</text_data><comment_date>2020-01-07T00:00:00</comment_date></row><row _id="row-j5rc~mvzc~t3w9" _uuid="00000000-0000-0000-7492-04E31D1F7517" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j5rc~mvzc~t3w9"><intent_id>542279</intent_id><project_id>698797</project_id><text_data>Scope of work: Robinswood Park streetscape frontage enhancements to include:  removal of existing grass with sod cutter, removal and disposal of old sprinkler heads and install new heads using pliers and various hand tools, planting of shrubs &amp; trees using shovels, rakes, buckets, wheelbarrow, installation of Fertimulch 2&amp;quot; depth with shovels, buckets and rakes, and site cleanup and debris disposal with rakes, buckets, wheelbarrow and Ford F550 dual wheeled, single axle truck.</text_data><comment_date>2012-10-30T00:00:00</comment_date></row><row _id="row-eq2y.yiu4.3r67" _uuid="00000000-0000-0000-5943-605E6D4CD030" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eq2y.yiu4.3r67"><intent_id>454911</intent_id><project_id>665712</project_id><text_data>ALLIED'S JOB #110509-0044.419</text_data><comment_date>2011-05-09T00:00:00</comment_date></row><row _id="row-gh5w.igbx_x4qs" _uuid="00000000-0000-0000-8BD6-11C0A1334D66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gh5w.igbx_x4qs"><intent_id>884136</intent_id><project_id>841815</project_id><text_data>Job# 200329</text_data><comment_date>2018-01-18T00:00:00</comment_date></row><row _id="row-8zyf~hah6_av3c" _uuid="00000000-0000-0000-DA16-EB509297EB08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zyf~hah6_av3c"><intent_id>984866</intent_id><project_id>884356</project_id><text_data>Applicator will operate hyrail spray truck along the rails and also hand spraying from hose reel on truck.</text_data><comment_date>2019-06-14T00:00:00</comment_date></row><row _id="row-vt78_296n.brg9" _uuid="00000000-0000-0000-ACDF-F2A3D4569E68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vt78_296n.brg9"><intent_id>652822</intent_id><project_id>743723</project_id><text_data>Several manufactured homes within the City of Spokane Valley		#1 - Heating duct sealing. #2 - Single family manufactured home? #3 - 1 level? #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2014-09-06T00:00:00</comment_date></row><row _id="row-vddz.axwi~73hg" _uuid="00000000-0000-0000-709E-1AF79671764D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vddz.axwi~73hg"><intent_id>807929</intent_id><project_id>809700</project_id><text_data>1)We were contracted to replace the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2016-12-20T00:00:00</comment_date></row><row _id="row-nbrn~xg6f.68xf" _uuid="00000000-0000-0000-2CCD-A386E084E5F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nbrn~xg6f.68xf"><intent_id>719581</intent_id><project_id>673648</project_id><text_data>Dump Truck Hauling</text_data><comment_date>2015-10-05T00:00:00</comment_date></row><row _id="row-6wpq.4yut_7ahn" _uuid="00000000-0000-0000-7895-49DC4C464559" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6wpq.4yut_7ahn"><intent_id>623494</intent_id><project_id>732398</project_id><text_data>Form filed by: Kathy BrownProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the above crafts/trades/occupations.</text_data><comment_date>2014-04-04T00:00:00</comment_date></row><row _id="row-aqmz~dmsm_hcy4" _uuid="00000000-0000-0000-D8BB-C3A88ACC6AF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aqmz~dmsm_hcy4"><intent_id>494295</intent_id><project_id>679082</project_id><text_data>residential apartment, 2 level, no basement, low income facility</text_data><comment_date>2011-12-21T00:00:00</comment_date></row><row _id="row-vcr5-bmze_quhq" _uuid="00000000-0000-0000-D69B-B213CB4755CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vcr5-bmze_quhq"><intent_id>622352</intent_id><project_id>731907</project_id><text_data>The sub-contractor will be fabricating in their own shop. The components are installed on-site by general contractor using their Genie type lift and hand tools.</text_data><comment_date>2014-04-21T00:00:00</comment_date></row><row _id="row-2vi2_bidv.5ywx" _uuid="00000000-0000-0000-9307-B6E279C6578C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2vi2_bidv.5ywx"><intent_id>578699</intent_id><project_id>714598</project_id><text_data>Other truck refers to Water Truck</text_data><comment_date>2013-07-02T00:00:00</comment_date></row><row _id="row-a9bp_nynd-ei2v" _uuid="00000000-0000-0000-B5CD-65F9FB6F0ECD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a9bp_nynd-ei2v"><intent_id>527992</intent_id><project_id>693665</project_id><text_data>MMFS Job#7326771</text_data><comment_date>2012-08-13T00:00:00</comment_date></row><row _id="row-eb92-vy5p.wx9q" _uuid="00000000-0000-0000-085A-2392C95D030F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eb92-vy5p.wx9q"><intent_id>759418</intent_id><project_id>790814</project_id><text_data>Installation of indoor copper telecommunications cabling</text_data><comment_date>2016-04-29T00:00:00</comment_date></row><row _id="row-6rhm_gfsw-wpe4" _uuid="00000000-0000-0000-2963-A39017A2E40F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6rhm_gfsw-wpe4"><intent_id>877632</intent_id><project_id>799376</project_id><text_data>HIRED BY SUB SALINAS CONSTRUCTION</text_data><comment_date>2017-12-05T00:00:00</comment_date></row><row _id="row-hjqx-gbcy_rfrm" _uuid="00000000-0000-0000-5E85-51DC0E289669" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjqx-gbcy_rfrm"><intent_id>1249380</intent_id><project_id>1022071</project_id><text_data>Project# 03890, Grafious, Paulette, 11815 N Wilson St, Lot B44, Mead, WA 99021</text_data><comment_date>2022-07-20T00:00:00</comment_date></row><row _id="row-z3zy~jseq~p8pz" _uuid="00000000-0000-0000-0148-0EBBD6F2B0D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3zy~jseq~p8pz"><intent_id>533691</intent_id><project_id>695674</project_id><text_data>Other trucks - 1992 International water truck - 2500 gallon capacity</text_data><comment_date>2012-09-11T00:00:00</comment_date></row><row _id="row-buhp-sd7p.if8b" _uuid="00000000-0000-0000-DBDA-4D868BEBD2EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-buhp-sd7p.if8b"><intent_id>785156</intent_id><project_id>800863</project_id><text_data>I am not certain that any listed wage applies. This job is for inspecting to locate and determine repairs for rodent entry points as well as conducive condition correction. Also for installing and servicing rodent traps. Have I chosen the correct trade?</text_data><comment_date>2016-09-03T00:00:00</comment_date></row><row _id="row-297p_fz7d.iezr" _uuid="00000000-0000-0000-E892-86C20011E5CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-297p_fz7d.iezr"><intent_id>769425</intent_id><project_id>794911</project_id><text_data>Repairs For SWRTS #2 Tuck Scale</text_data><comment_date>2016-06-20T00:00:00</comment_date></row><row _id="row-rhyw~cz5j~exgw" _uuid="00000000-0000-0000-E31F-D3E4A60A4809" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rhyw~cz5j~exgw"><intent_id>956762</intent_id><project_id>871542</project_id><text_data>Truck Drivers - Other Trucks is a water tank truck used to flush asphalt.</text_data><comment_date>2019-01-24T00:00:00</comment_date></row><row _id="row-x86r-2kpu~52xp" _uuid="00000000-0000-0000-5DA7-03798A1AF93C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x86r-2kpu~52xp"><intent_id>887037</intent_id><project_id>843114</project_id><text_data>Filed by Stefany A Nash</text_data><comment_date>2018-02-07T00:00:00</comment_date></row><row _id="row-di3u_jfzz~a6mz" _uuid="00000000-0000-0000-C146-E6F8807F1D62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-di3u_jfzz~a6mz"><intent_id>980440</intent_id><project_id>850155</project_id><text_data>Job #29168-1</text_data><comment_date>2019-05-28T00:00:00</comment_date></row><row _id="row-y4w7.447g_8cne" _uuid="00000000-0000-0000-62C7-84C806D384C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y4w7.447g_8cne"><intent_id>600554</intent_id><project_id>722425</project_id><text_data>Job # 921391</text_data><comment_date>2013-10-21T00:00:00</comment_date></row><row _id="row-p4g4-5sgv.4hpf" _uuid="00000000-0000-0000-2559-D164882E9784" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4g4-5sgv.4hpf"><intent_id>987989</intent_id><project_id>885720</project_id><text_data>117540-001</text_data><comment_date>2019-06-27T00:00:00</comment_date></row><row _id="row-ymx7_f5rj~uht2" _uuid="00000000-0000-0000-97E7-A12C60E735E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ymx7_f5rj~uht2"><intent_id>937549</intent_id><project_id>863192</project_id><text_data>Filed by Peter Brower</text_data><comment_date>2018-10-03T00:00:00</comment_date></row><row _id="row-yqz6.ykst.kxw5" _uuid="00000000-0000-0000-2D47-0461B5572678" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yqz6.ykst.kxw5"><intent_id>921356</intent_id><project_id>855739</project_id><text_data>Brumfield job# 18-1445-00TRUCKSlowboy delivers asphalt rotomill to jobsitewater truck driven to jobsite</text_data><comment_date>2018-07-27T00:00:00</comment_date></row><row _id="row-gngj_8zb8.mezv" _uuid="00000000-0000-0000-1ED3-F7B425DF8D78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gngj_8zb8.mezv"><intent_id>825723</intent_id><project_id>817756</project_id><text_data>Other Trucks-Lowboy</text_data><comment_date>2017-04-11T00:00:00</comment_date></row><row _id="row-3e27_6ygs.mw3z" _uuid="00000000-0000-0000-B415-B6DF78F1B55E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3e27_6ygs.mw3z"><intent_id>1022471</intent_id><project_id>899884</project_id><text_data>FILED BY VINCE CURTIS</text_data><comment_date>2019-11-19T00:00:00</comment_date></row><row _id="row-rbvm.ukzf_mrg7" _uuid="00000000-0000-0000-25A6-9D8C68C304C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rbvm.ukzf_mrg7"><intent_id>940520</intent_id><project_id>864341</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2018-10-18T00:00:00</comment_date></row><row _id="row-6v8f_v7d6.jjkn" _uuid="00000000-0000-0000-32DE-4E782267F375" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6v8f_v7d6.jjkn"><intent_id>1258268</intent_id><project_id>1026628</project_id><comment_date>2022-10-03T00:00:00</comment_date></row><row _id="row-xfp8~efz3-pp49" _uuid="00000000-0000-0000-29AE-8F73776BAAD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xfp8~efz3-pp49"><intent_id>733913</intent_id><project_id>777964</project_id><text_data>Project is removing storm damaged trees.  Workers will be using chainsaws, brush chipper, skidsteer, leaf blowers, rakes.</text_data><comment_date>2015-12-02T00:00:00</comment_date></row><row _id="row-r2py.fqji~87y2" _uuid="00000000-0000-0000-FD25-F253926571BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r2py.fqji~87y2"><intent_id>795236</intent_id><project_id>801015</project_id><text_data>Filed by John E. Griswold.This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2016-10-11T00:00:00</comment_date></row><row _id="row-e2wj.tu9b_ks7e" _uuid="00000000-0000-0000-B583-FE88152178B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e2wj.tu9b_ks7e"><intent_id>462831</intent_id><project_id>667500</project_id><text_data>We are paying the correct fringe benefit of $22.13 which is NOT deducted from employee.  Below is the breakdown of EMPLOYER contribution:NW Sheet Metal Workers Pension $6.93NW Sheet Metal Workers 401 K Plan $4.24NW Health Care $7.50/ Extended $0.15/ VEBA $1.03 � total $8.68International Training Institute $0.12/NEMI $0.03/ SMOHIT $0.02 - total $.017Apprenticeship Fund $01.00Industry Fund $0.60Organizational Trust Fund $0.75Northwest Supplemental Plan $0.79Clean Card $0.07 Total Package $67.82</text_data><comment_date>2011-07-14T00:00:00</comment_date></row><row _id="row-ey2x_jszz-5uq8" _uuid="00000000-0000-0000-0321-279642C21798" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ey2x_jszz-5uq8"><intent_id>1206436</intent_id><project_id>996461</project_id><text_data>Invoice 497879-00 / Labor SRO 481824</text_data><comment_date>2022-01-24T00:00:00</comment_date></row><row _id="row-cdfw~mikw_dkbk" _uuid="00000000-0000-0000-4956-1660F5F84482" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cdfw~mikw_dkbk"><intent_id>1210365</intent_id><project_id>998850</project_id><text_data>WO#27113 Job#1403</text_data><comment_date>2022-02-09T00:00:00</comment_date></row><row _id="row-rz9p_pnh6.ri4y" _uuid="00000000-0000-0000-A5EE-D7F671E3C4DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rz9p_pnh6.ri4y"><intent_id>893443</intent_id><project_id>846084</project_id><text_data>WO #8033273</text_data><comment_date>2018-03-19T00:00:00</comment_date></row><row _id="row-43dx-j9rv~n3dy" _uuid="00000000-0000-0000-9641-83BEF349A0C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-43dx-j9rv~n3dy"><intent_id>571087</intent_id><project_id>711631</project_id><text_data>ME1593FILED BY:  Annie Stewart</text_data><comment_date>2013-05-22T00:00:00</comment_date></row><row _id="row-afx8_vvj8~xgkw" _uuid="00000000-0000-0000-07DF-EE6DE2954D11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-afx8_vvj8~xgkw"><intent_id>679046</intent_id><project_id>755619</project_id><text_data>Single Family low income weatherization/insulation upgrade</text_data><comment_date>2015-02-12T00:00:00</comment_date></row><row _id="row-rcm4_mr7d~6whf" _uuid="00000000-0000-0000-A728-DB752E43FE49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rcm4_mr7d~6whf"><intent_id>924911</intent_id><project_id>858451</project_id><text_data>A sports turf drainage installation project; Slit-drainage is to drain standing water, ie: rain, irrigation.  A trench that is consistently less than 2 feet is cut (skid steer (less than  90 hp) with implement) / dug (handwork using shovels) and drain pipe is installed then the trench is filled.</text_data><comment_date>2018-08-10T00:00:00</comment_date></row><row _id="row-vkk7-b27t.98ic" _uuid="00000000-0000-0000-0F23-ED1D67CAC486" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkk7-b27t.98ic"><intent_id>757341</intent_id><project_id>789883</project_id><text_data>GENERAL LABORER WILL CLEAN UP AND MOVE MATERIALS WITH RAGES &amp; SHOVELS</text_data><comment_date>2016-04-19T00:00:00</comment_date></row><row _id="row-bn2i.f8zw_v4je" _uuid="00000000-0000-0000-3853-88885C582BAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bn2i.f8zw_v4je"><intent_id>620304</intent_id><project_id>706126</project_id><text_data>Form filed by: Hilario Quintero</text_data><comment_date>2014-03-14T00:00:00</comment_date></row><row _id="row-yjse-dgvw_pa7q" _uuid="00000000-0000-0000-9852-0922A6C54F28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yjse-dgvw_pa7q"><intent_id>1193942</intent_id><project_id>988413</project_id><comment_date>2021-11-17T00:00:00</comment_date></row><row _id="row-u6s5~at38.uz6c" _uuid="00000000-0000-0000-4ED8-6D444FDDDB8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u6s5~at38.uz6c"><intent_id>862050</intent_id><project_id>745512</project_id><text_data>Audio/Video cabling within the building</text_data><comment_date>2017-09-12T00:00:00</comment_date></row><row _id="row-87ax.yzah~25ks" _uuid="00000000-0000-0000-228C-05EDBF72FF13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87ax.yzah~25ks"><intent_id>746938</intent_id><project_id>782441</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2016-02-16T00:00:00</comment_date></row><row _id="row-w2vs-4j7d-etwk" _uuid="00000000-0000-0000-BF5E-B8099B5B7E7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w2vs-4j7d-etwk"><intent_id>1113941</intent_id><project_id>930056</project_id><text_data>Stoneway Concrete is a Supplier</text_data><comment_date>2021-01-08T00:00:00</comment_date></row><row _id="row-6e4b~e6ff.euc7" _uuid="00000000-0000-0000-C3C8-C151B7CA571F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6e4b~e6ff.euc7"><intent_id>586244</intent_id><project_id>715081</project_id><text_data>Scope of work includes irrigation repairs on damaged lines.</text_data><comment_date>2013-08-07T00:00:00</comment_date></row><row _id="row-u9fj~bu7t.mr3d" _uuid="00000000-0000-0000-064B-FB9E5DA7160F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u9fj~bu7t.mr3d"><intent_id>1220497</intent_id><project_id>937198</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2022-04-18T00:00:00</comment_date></row><row _id="row-v3m6_b35w~f4xn" _uuid="00000000-0000-0000-5127-B037CC07BDCC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3m6_b35w~f4xn"><intent_id>1007336</intent_id><project_id>893354</project_id><text_data>Equipment used: pickup truck for debris removal, plastic bags, etc.</text_data><comment_date>2019-09-16T00:00:00</comment_date></row><row _id="row-s4vk_rgix_u43d" _uuid="00000000-0000-0000-418A-0F57CDA98175" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4vk_rgix_u43d"><intent_id>1143401</intent_id><project_id>924989</project_id><text_data>#1 - Interior and Exterior Paint#2 - Residential units#3 - 4 Three-story buildings#4 - Affordable Housing apartments(a) No(b) No(c) Yes(d) No(e) No(f) No(g) No(h) No(i) No(j) No(k) No(l) No#5 - Yes#6 - Yes#7- Yes#8 - No</text_data><comment_date>2021-05-19T00:00:00</comment_date></row><row _id="row-hbjn~rwmm_wy5h" _uuid="00000000-0000-0000-E16B-A1F802CCC851" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hbjn~rwmm_wy5h"><intent_id>785791</intent_id><project_id>801115</project_id><text_data>Install and move cabling which can be used for telephone (voice over distance) and data (bits &amp; bytes) connections within the telecommunications system. This work will be performed indoors.</text_data><comment_date>2016-08-29T00:00:00</comment_date></row><row _id="row-7ihf_jrzr_pxqh" _uuid="00000000-0000-0000-DF70-F3BD71723793" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ihf_jrzr_pxqh"><intent_id>757779</intent_id><project_id>790092</project_id><text_data>Telecom Tech(09)Install conduit and floor boxes</text_data><comment_date>2016-04-21T00:00:00</comment_date></row><row _id="row-p7aj~yb8h~vq93" _uuid="00000000-0000-0000-8546-149D668C6E3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7aj~yb8h~vq93"><intent_id>478255</intent_id><project_id>662595</project_id><text_data>We are an Idaho based subcontractor.  Our industrial insurance is with Liberty NW and covers our Idaho employees when they work in Washington.</text_data><comment_date>2011-09-15T00:00:00</comment_date></row><row _id="row-phz4.z6xt-tkm2" _uuid="00000000-0000-0000-C3F3-1D677B7B62D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-phz4.z6xt-tkm2"><intent_id>1129631</intent_id><project_id>954633</project_id><text_data>Truck Information:Size- 19,500 LBSSpecific Type- Electric Hino 2016 DieselPurpose- Delivery of materials and equipment</text_data><comment_date>2021-03-31T00:00:00</comment_date></row><row _id="row-nmdj-yw3b~9z8j" _uuid="00000000-0000-0000-E5DB-46427A160DFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nmdj-yw3b~9z8j"><intent_id>1175371</intent_id><project_id>969646</project_id><text_data>Fringe Benefit Breakdown: Health $9.20, Pension $11.00, Apprenticeship $.74, Annuity $7.95, Impact $.28, PTO $2.40</text_data><comment_date>2021-09-07T00:00:00</comment_date></row><row _id="row-9tyq_7rdm_c8aq" _uuid="00000000-0000-0000-CC30-66AF9AD3D5C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9tyq_7rdm_c8aq"><intent_id>1140221</intent_id><project_id>959988</project_id><text_data>HUD Determined Non-Routine Maintenance Wages</text_data><comment_date>2021-04-28T00:00:00</comment_date></row><row _id="row-c2w9_g3sx.nswa" _uuid="00000000-0000-0000-0B60-D0C4B7F0C40B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c2w9_g3sx.nswa"><intent_id>831003</intent_id><project_id>819917</project_id><text_data>PC6 - job # 912-3PO 53694INVOICE #3068185CE</text_data><comment_date>2017-05-04T00:00:00</comment_date></row><row _id="row-hwcu~84zf~rvxi" _uuid="00000000-0000-0000-C9F8-AB11994FBA11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hwcu~84zf~rvxi"><intent_id>739342</intent_id><project_id>781566</project_id><text_data>Filed by Vivian Hurd</text_data><comment_date>2015-12-28T00:00:00</comment_date></row><row _id="row-c6xe-wpmu-i8fw" _uuid="00000000-0000-0000-8915-C5D03B8FF346" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6xe-wpmu-i8fw"><intent_id>1282384</intent_id><project_id>1040182</project_id><text_data>All employees on site are performing basic siding repair and installation. Tools and equipment in use by employees are circular saws, siding nail guns and hand tools. Employees will also perform clean up dutys.</text_data><comment_date>2022-11-23T00:00:00</comment_date></row><row _id="row-9fgu-8njc-5r3e" _uuid="00000000-0000-0000-B3A4-92D6F518C27A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9fgu-8njc-5r3e"><intent_id>754313</intent_id><project_id>788568</project_id><text_data>1. Install ductless mini split 2. Single Family Dwelling3. 14. a,b NO4. c YES4. d,e,f,g,h,i,j,k  NO5. YES6. YES7. NO8. NO</text_data><comment_date>2016-03-31T00:00:00</comment_date></row><row _id="row-atwr-rrt4~5nza" _uuid="00000000-0000-0000-9697-24195D342B9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-atwr-rrt4~5nza"><intent_id>698907</intent_id><project_id>764132</project_id><text_data>$37,80</text_data><comment_date>2015-06-07T00:00:00</comment_date></row><row _id="row-rida_86ta-6zcw" _uuid="00000000-0000-0000-A945-58096ACCDF91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rida_86ta-6zcw"><intent_id>722214</intent_id><project_id>756482</project_id><text_data>Residential Housing Community</text_data><comment_date>2015-09-22T00:00:00</comment_date></row><row _id="row-tahp.avfw-a4uq" _uuid="00000000-0000-0000-D8E6-3D6CB8B84DB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tahp.avfw-a4uq"><intent_id>973208</intent_id><project_id>839969</project_id><text_data>Filed by Seanna Trentman- Project is exempt from state prevailing wage requirements based on the housing act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2019-04-23T00:00:00</comment_date></row><row _id="row-qya3-3zzb_feyi" _uuid="00000000-0000-0000-5608-80F903D80375" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qya3-3zzb_feyi"><intent_id>544529</intent_id><project_id>699709</project_id><text_data>Roofer prevailing wage rate of $20.85 per hour</text_data><comment_date>2012-11-14T00:00:00</comment_date></row><row _id="row-effr_26wn~aets" _uuid="00000000-0000-0000-9E4B-28556A6C5B58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-effr_26wn~aets"><intent_id>746594</intent_id><project_id>774436</project_id><text_data>Cutting steel sheets to length for installation with torch on site at the Fish Hatchery. A cutting torch and a propane bottle are the tools used. No special vehicles are used.</text_data><comment_date>2016-02-19T00:00:00</comment_date></row><row _id="row-p43p_5wvs.vp3y" _uuid="00000000-0000-0000-F16D-72C095A9A87C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p43p_5wvs.vp3y"><intent_id>790018</intent_id><project_id>765837</project_id><text_data>Installing sod rolls at the schools playfield we did not install the dirt or irrigation system just rolled out the sod rolls</text_data><comment_date>2016-09-19T00:00:00</comment_date></row><row _id="row-mcgj_c3wt-2uh2" _uuid="00000000-0000-0000-7439-709DF2EC3CD3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mcgj_c3wt-2uh2"><intent_id>1147751</intent_id><project_id>963994</project_id><text_data>PTI SO 160741</text_data><comment_date>2021-05-26T00:00:00</comment_date></row><row _id="row-yysk.ns4j-ep4g" _uuid="00000000-0000-0000-2034-C222635B5D52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yysk.ns4j-ep4g"><intent_id>676714</intent_id><project_id>754582</project_id><text_data>Form filed by:  Reham Aarti</text_data><comment_date>2015-01-27T00:00:00</comment_date></row><row _id="row-2dzm-65tc_m9bm" _uuid="00000000-0000-0000-9C07-C8FCE0EE679A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2dzm-65tc_m9bm"><intent_id>764974</intent_id><project_id>793183</project_id><text_data>WO #160419-023</text_data><comment_date>2016-05-27T00:00:00</comment_date></row><row _id="row-4376_d7zv.szyf" _uuid="00000000-0000-0000-52E7-F27D9C9B089F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4376_d7zv.szyf"><intent_id>910905</intent_id><project_id>853256</project_id><text_data>Filed by Mark Meaker</text_data><comment_date>2018-06-13T00:00:00</comment_date></row><row _id="row-9k6r~mvxg~i9dp" _uuid="00000000-0000-0000-80A2-19C300053E89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9k6r~mvxg~i9dp"><intent_id>1195698</intent_id><project_id>977216</project_id><text_data>VE 21602</text_data><comment_date>2021-11-29T00:00:00</comment_date></row><row _id="row-aiek~y9jn_mtks" _uuid="00000000-0000-0000-0D15-012D91B18CFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aiek~y9jn_mtks"><intent_id>943596</intent_id><project_id>789978</project_id><text_data>Our industrial insurance expired when we closed down at the end of last year.</text_data><comment_date>2018-11-02T00:00:00</comment_date></row><row _id="row-zbvg.d6ii_zxyd" _uuid="00000000-0000-0000-0B6B-F8A0065F8C30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zbvg.d6ii_zxyd"><intent_id>969903</intent_id><project_id>868947</project_id><text_data>5020.190073</text_data><comment_date>2019-04-05T00:00:00</comment_date></row><row _id="row-p939_k5f6_nvbx" _uuid="00000000-0000-0000-A96B-1801E68E2B8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p939_k5f6_nvbx"><intent_id>752436</intent_id><project_id>787432</project_id><text_data>new lights 2 electricians</text_data><comment_date>2016-03-21T00:00:00</comment_date></row><row _id="row-4hyt-gb8w-hxm6" _uuid="00000000-0000-0000-7743-AC63CD81FD11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4hyt-gb8w-hxm6"><intent_id>842365</intent_id><project_id>798268</project_id><text_data>HIRED BY SUB WHH NISQUALLY</text_data><comment_date>2017-06-21T00:00:00</comment_date></row><row _id="row-2c83-xwvy.u6az" _uuid="00000000-0000-0000-2EBA-74EB9901969D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2c83-xwvy.u6az"><intent_id>607593</intent_id><project_id>725212</project_id><text_data>Filed by Christina NessProject is exempt from the payment of state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2013-12-09T00:00:00</comment_date></row><row _id="row-6gc9-gtgj-qh5t" _uuid="00000000-0000-0000-10F9-10D6FBB18B05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6gc9-gtgj-qh5t"><intent_id>714824</intent_id><project_id>770090</project_id><text_data>Laborers to perform installation of cured in place pipeliners (CIPP).  Specialty work.  CIPP laborers will drive trucks to project (flatbeds/pickups/etc) to do work.  CIPP is the process of inserting a felt/resin &amp;quot;sock&amp;quot; inside the existing pipe without excavation.</text_data><comment_date>2015-08-17T00:00:00</comment_date></row><row _id="row-9uct.4w68~tdzb" _uuid="00000000-0000-0000-E6F9-1FA0DCD10563" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9uct.4w68~tdzb"><intent_id>1018655</intent_id><project_id>898200</project_id><text_data>#20599, Cummins,Leslie, 911 E Wabash, Spokane</text_data><comment_date>2019-11-04T00:00:00</comment_date></row><row _id="row-2vmh~id9z_tgit" _uuid="00000000-0000-0000-0733-E001EB19A94F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2vmh~id9z_tgit"><intent_id>654632</intent_id><project_id>744413</project_id><text_data>A)Parts of the project were crank shaft, bearings, 2 limit cams, 2 cylinder camsB) Carpenter Tender helped to take motorized gate arm off, helped dissemble gate operator, loosened belts and screwsC) Equipment used was 1 work van, general hand tools, cordless impact, reciprocating saw</text_data><comment_date>2014-09-17T00:00:00</comment_date></row><row _id="row-hucp.ait2.h57h" _uuid="00000000-0000-0000-4A27-EDF9FCB1514C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hucp.ait2.h57h"><intent_id>1200176</intent_id><project_id>989861</project_id><text_data>we are owner/operator/driver, we have no employees</text_data><comment_date>2021-12-17T00:00:00</comment_date></row><row _id="row-etuw_daqm_mpzw" _uuid="00000000-0000-0000-2A7A-03C62C2F7824" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-etuw_daqm_mpzw"><intent_id>1240658</intent_id><project_id>994111</project_id><text_data>BMI WO221552</text_data><comment_date>2022-06-13T00:00:00</comment_date></row><row _id="row-fg9j~b5hb-sep4" _uuid="00000000-0000-0000-AAE2-584FBF189494" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fg9j~b5hb-sep4"><intent_id>958301</intent_id><project_id>865909</project_id><text_data>Filed by Ian Evenson</text_data><comment_date>2019-02-01T00:00:00</comment_date></row><row _id="row-4e85.2f6h-rvtk" _uuid="00000000-0000-0000-DE94-B6CB52E71EC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4e85.2f6h-rvtk"><intent_id>1127649</intent_id><project_id>953680</project_id><text_data>Other Truck - Water TruckOther Truck - Lowboy Heavy Duty Trailer</text_data><comment_date>2021-03-10T00:00:00</comment_date></row><row _id="row-c2a2_jkfu.vvkq" _uuid="00000000-0000-0000-1CE6-72082DF9BDDC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c2a2_jkfu.vvkq"><intent_id>1148428</intent_id><project_id>964368</project_id><text_data>1 INSTALLATION OF AN AMERICAN  STANDARD HEAT PUMP</text_data><comment_date>2021-05-28T00:00:00</comment_date></row><row _id="row-7kq9.99mc~ha9s" _uuid="00000000-0000-0000-AD67-9E56641C2101" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7kq9.99mc~ha9s"><intent_id>1007428</intent_id><project_id>893389</project_id><text_data>hourly pension, hourly medical, hourly vacation hourly holiday, approved apprentice program</text_data><comment_date>2019-09-16T00:00:00</comment_date></row><row _id="row-98r8-f8yt_zkzt" _uuid="00000000-0000-0000-CB1A-567AF0783842" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-98r8-f8yt_zkzt"><intent_id>1233204</intent_id><project_id>1013049</project_id><text_data>Inside workElect tech(06)provide labor to install data cabling and new camerasLAN(Local Area Network)</text_data><comment_date>2022-05-12T00:00:00</comment_date></row><row _id="row-w7gu-8s5z~cwfm" _uuid="00000000-0000-0000-AA7C-6D83F9D74313" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w7gu-8s5z~cwfm"><intent_id>498386</intent_id><project_id>681941</project_id><text_data>Form filed by: Larry Campbell</text_data><comment_date>2012-02-06T00:00:00</comment_date></row><row _id="row-3a59-uptx_xyrm" _uuid="00000000-0000-0000-6952-5E9968EA98D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3a59-uptx_xyrm"><intent_id>1075830</intent_id><project_id>927092</project_id><text_data>#1-furnace and heat pump replacement	; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2020-07-28T00:00:00</comment_date></row><row _id="row-befr_29y5.y29d" _uuid="00000000-0000-0000-636F-144E17D25DCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-befr_29y5.y29d"><intent_id>1393104</intent_id><project_id>1096361</project_id><text_data>WRI Job #24.001</text_data><comment_date>2024-01-09T00:00:00</comment_date></row><row _id="row-tye2-42sp~tsbm" _uuid="00000000-0000-0000-FB40-476800D573C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tye2-42sp~tsbm"><intent_id>1147621</intent_id><project_id>922622</project_id><text_data>PLEASE NOTE THAT 'OTHER TRUCKS' IS AN 8,000 GALLON WATER TRUCK</text_data><comment_date>2021-05-25T00:00:00</comment_date></row><row _id="row-2pm8-2urw.sedw" _uuid="00000000-0000-0000-4FB2-0F096491E210" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2pm8-2urw.sedw"><intent_id>875272</intent_id><project_id>822768</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 6 for data (computer networking ) indoors.  Physical location:  SE 256th &amp; 156th Avenue SE, Covington, WA  98042</text_data><comment_date>2017-11-16T00:00:00</comment_date></row><row _id="row-qfhe-gxrv-cfnj" _uuid="00000000-0000-0000-4599-2ED59A9FEBA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qfhe-gxrv-cfnj"><intent_id>713853</intent_id><project_id>769747</project_id><text_data>JOB 905-12  PC6</text_data><comment_date>2015-08-12T00:00:00</comment_date></row><row _id="row-z5tj~jip5.rkx8" _uuid="00000000-0000-0000-F3E0-A6CF4ADD2023" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z5tj~jip5.rkx8"><intent_id>538219</intent_id><project_id>697259</project_id><text_data>TGLC has hired an arbor sub (Davey Tree)to complete the deep root fertilizer application. We (TGLC) will complete the plant material removal and installation of cobble and sod. This will include using shovels, pruners, wheelbarrows, rake, roller, etc.</text_data><comment_date>2012-10-15T00:00:00</comment_date></row><row _id="row-bqyr.bs5e_2yw6" _uuid="00000000-0000-0000-6F75-343AE304812F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bqyr.bs5e_2yw6"><intent_id>995904</intent_id><project_id>887177</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2019-07-31T00:00:00</comment_date></row><row _id="row-nzje.iadm-pvem" _uuid="00000000-0000-0000-F2D1-3943882D6E24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nzje.iadm-pvem"><intent_id>939146</intent_id><project_id>863780</project_id><text_data>18-48-6763</text_data><comment_date>2018-10-11T00:00:00</comment_date></row><row _id="row-pxsg~sah8_zixh" _uuid="00000000-0000-0000-8A00-4B9F56ED94F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pxsg~sah8_zixh"><intent_id>1099104</intent_id><project_id>929274</project_id><text_data>Providing the safety surfacing(engineered wood fiber playchips) for a playground using a blower/mulch truck.</text_data><comment_date>2020-11-05T00:00:00</comment_date></row><row _id="row-mwdy_up8c~dmy5" _uuid="00000000-0000-0000-CBC4-34148EAD1018" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mwdy_up8c~dmy5"><intent_id>1030334</intent_id><project_id>843228</project_id><text_data>Blythe Job V-302See also Blythe Plumbing &amp; Heating Inc Intent 890778 for work prior to 8/2/2019 name change and re-licensing. Both intents reflect same estimated contract amount to indicate a single contract. Both later affidavits will list the same final contract amounts to do the same.</text_data><comment_date>2020-01-07T00:00:00</comment_date></row><row _id="row-hhmp_qnvq~3t9d" _uuid="00000000-0000-0000-B53C-7E9976747D40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hhmp_qnvq~3t9d"><intent_id>615827</intent_id><project_id>725619</project_id><text_data>Penhall Job # 230864</text_data><comment_date>2014-02-11T00:00:00</comment_date></row><row _id="row-pijx-7qdh-qz7y" _uuid="00000000-0000-0000-F84C-631D6D9786C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pijx-7qdh-qz7y"><intent_id>954199</intent_id><project_id>850802</project_id><text_data>#1: Hookup Heat Pump#2: Single Family dwelling#3: single story home#4(a): no#4(b): no#4(c): yes#4(d): no#4(e): no#4(f): no#4(g): no#4(h): no#4(i): no#4(j): no#4(k): no#4(l): N/A#5: yes#6: yes#7: no#8: no</text_data><comment_date>2019-01-09T00:00:00</comment_date></row><row _id="row-q735_fhga-4rbt" _uuid="00000000-0000-0000-8889-E8580AB2CBBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q735_fhga-4rbt"><intent_id>993120</intent_id><project_id>809779</project_id><text_data>None</text_data><comment_date>2019-07-19T00:00:00</comment_date></row><row _id="row-nzjz~e8gi-e789" _uuid="00000000-0000-0000-B265-72B0CA743866" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nzjz~e8gi-e789"><intent_id>1268794</intent_id><project_id>1028024</project_id><text_data>Fringe Breakdown (Local 242 $13.94):Health &amp; Welfare - $7.55Pension - $5.30Apprenticeship/Training - $1.09 Fringe Breakdown (Local 302 $22.47)Health &amp; Security - $7.32Pension - $16.40Apprenticeship Training/Retraining - $0.70National Training - $0.05</text_data><comment_date>2022-10-13T00:00:00</comment_date></row><row _id="row-rpsf.utvn.9sy7" _uuid="00000000-0000-0000-C1B3-7F58E2EFF613" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rpsf.utvn.9sy7"><intent_id>833055</intent_id><project_id>820757</project_id><text_data>Blanchard Mountain Road grading BL-ML from pavement to locked gate at mp 1.9. BL-16 from BL-ML to paved parking at overlook 2.2 miles. Cruse Road grading MI-ML from end of pavement at mp .2 to jct with MI-09 at mp 1.0. .8 miles. MI-09 from MI-ML to end of State Land at mp .5, .5 miles.</text_data><comment_date>2017-05-23T00:00:00</comment_date></row><row _id="row-y5u3_fv3q_8mz8" _uuid="00000000-0000-0000-99EA-73DC57A74916" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5u3_fv3q_8mz8"><intent_id>886755</intent_id><project_id>842993</project_id><text_data>Replaced the indoor circuits boards for the ductless heat pump.</text_data><comment_date>2018-02-23T00:00:00</comment_date></row><row _id="row-piya~thmw~b8e9" _uuid="00000000-0000-0000-5DF3-BA0B06739C6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-piya~thmw~b8e9"><intent_id>510030</intent_id><project_id>682990</project_id><text_data>Purcell Project #12006</text_data><comment_date>2012-05-01T00:00:00</comment_date></row><row _id="row-si8a-ci9n-wfaz" _uuid="00000000-0000-0000-6B4E-CB232E7488BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-si8a-ci9n-wfaz"><intent_id>657266</intent_id><project_id>719338</project_id><text_data>Form filed by:Diana OlsonProject is exempt from State Prevailing Wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2014-09-26T00:00:00</comment_date></row><row _id="row-heu8~t627-psw5" _uuid="00000000-0000-0000-1D05-D855BA513E0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-heu8~t627-psw5"><intent_id>832627</intent_id><project_id>817409</project_id><text_data>Install irrigation system, supply / place 6� topsoil in planting beds, supply / install plant material, install edging, place 2� mulch in planting beds, sod lawn.  Equipment to be used:  hand tools, power equipment under 90 hp (bobcat, mini-excavator)</text_data><comment_date>2017-05-12T00:00:00</comment_date></row><row _id="row-w8k6~u93r_yege" _uuid="00000000-0000-0000-CC0F-55C6A5A35677" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w8k6~u93r_yege"><intent_id>599733</intent_id><project_id>722123</project_id><text_data>Jet out trench drainMotor Patrol Graders to vacuum area of all contaminated materialsGeneral Laborer to keep area clear of all debris using broom, shovel and/or small hand tools</text_data><comment_date>2013-10-16T00:00:00</comment_date></row><row _id="row-ts8d_d6fg.57hu" _uuid="00000000-0000-0000-41D9-615A21B4807F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ts8d_d6fg.57hu"><intent_id>501699</intent_id><project_id>683277</project_id><text_data>HIF's 12131311, 12131350, 12131364,12131451, 12131497, 12131527, 12131535, 12131582, 12131610, 12131653, 12131665, 12131694, 12131700, 12131717, 12131720, 12131726, 12131731, 12133391, 12133397, 12133487, 12133539, 12133624, 12133678, 12133704</text_data><comment_date>2012-02-24T00:00:00</comment_date></row><row _id="row-gmqy-9k8a-vmgf" _uuid="00000000-0000-0000-48D5-687F47FA9B57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gmqy-9k8a-vmgf"><intent_id>718200</intent_id><project_id>771349</project_id><text_data>Installed 25 new plenum data/voice cables inside the Pateros High School.</text_data><comment_date>2015-09-01T00:00:00</comment_date></row><row _id="row-zzph_g6nc.wcwg" _uuid="00000000-0000-0000-829F-2F610F9F3EA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zzph_g6nc.wcwg"><intent_id>835427</intent_id><project_id>822324</project_id><text_data>This project was a clean up from a busted boiler. Our company is doing the water mitigation and drying out of the facility. Our water certified technicians are using ServiceMaster drying equipment including dehumidifiers and air movers.</text_data><comment_date>2017-05-22T00:00:00</comment_date></row><row _id="row-gagu-j557~997h" _uuid="00000000-0000-0000-BEB7-2D93F9707655" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gagu-j557~997h"><intent_id>616733</intent_id><project_id>729319</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?</text_data><comment_date>2014-02-18T00:00:00</comment_date></row><row _id="row-7emq-gkq6_pnx2" _uuid="00000000-0000-0000-1CDA-0AC40469460A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7emq-gkq6_pnx2"><intent_id>1146832</intent_id><project_id>963480</project_id><text_data>Install fiber outside between CTE building and the auto shop. Install 27 cat6 data drops inside CTE building and inside the 2 shop buildings.</text_data><comment_date>2021-05-23T00:00:00</comment_date></row><row _id="row-3jsm.u9yu.v3ut" _uuid="00000000-0000-0000-7AEC-8868265BEBC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3jsm.u9yu.v3ut"><intent_id>1138046</intent_id><project_id>948208</project_id><text_data>Stoneway Concrete is a Supplier</text_data><comment_date>2021-04-22T00:00:00</comment_date></row><row _id="row-4cas~he2d-srjp" _uuid="00000000-0000-0000-C922-187A70DA98A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4cas~he2d-srjp"><intent_id>1099952</intent_id><project_id>907022</project_id><text_data>PR29262</text_data><comment_date>2020-10-29T00:00:00</comment_date></row><row _id="row-ujiu~jetg.f4jr" _uuid="00000000-0000-0000-4CFE-3C4D8006AC71" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ujiu~jetg.f4jr"><intent_id>1394238</intent_id><project_id>1105111</project_id><text_data>TRICO 4691-24</text_data><comment_date>2024-01-12T00:00:00</comment_date></row><row _id="row-kaeg~ht6p.97wf" _uuid="00000000-0000-0000-F75F-56256628AB7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kaeg~ht6p.97wf"><intent_id>1395669</intent_id><project_id>979113</project_id><text_data>Sheetmetal fabrication labor performed at Capital's shop located in Lacey, Thurston County</text_data><comment_date>2024-01-19T00:00:00</comment_date></row><row _id="row-a5hp_giyu-r93a" _uuid="00000000-0000-0000-354C-533943950DF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5hp_giyu-r93a"><intent_id>804011</intent_id><project_id>804519</project_id><text_data>General Laborer: Performs work of shoveling with a hand shovel, cleaning/sweeping with a hand broom, heating joints with a Flamo, Tacking using a tack bucket.Other Trucks: A Low Boy trailer for delivery and pickup of equipment</text_data><comment_date>2016-11-23T00:00:00</comment_date></row><row _id="row-qzxw~apwn~692s" _uuid="00000000-0000-0000-4C15-9DCDCBCCF03A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qzxw~apwn~692s"><intent_id>959876</intent_id><project_id>873018</project_id><text_data>#1-We were contracted to install a hot water heater. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2019-02-28T00:00:00</comment_date></row><row _id="row-5ex7~ebk4~gnwe" _uuid="00000000-0000-0000-66FE-1D90A9403C72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ex7~ebk4~gnwe"><intent_id>545704</intent_id><project_id>700193</project_id><text_data>Park and open space renovation: tree removal, sod removal, grading preparatory to landscaping subsurface drainage collection system not deeper than 3', import topsoil and amendments, seeding, planting, mulching, irrigation system, concrete paving, concrete curbs, site amenities, picnic shelter construction. Terra Dynamics Inc. Self Performed Work: tree removal, sod removal, re-contouring for positive drainage, grading in preparation for landscaping, amending existing soils, import topsoil, mulching, seeding, planting, irrigation system, subsurface collection system not deeper than 3', site amenities. Equip. to be used by Terra Dynamics: dozer under 90 hp, mini-excavators, loaders under 90hp, on site dump truck, excavator under 90 hp and over 90 hp. Subcontracted Work: Electrical, Plumbing, Construction of picnic shelter, concrete paving &amp; concrete curb.</text_data><comment_date>2012-11-26T00:00:00</comment_date></row><row _id="row-6bgd.tdkp-uzzp" _uuid="00000000-0000-0000-8AB2-140DF6FDA921" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6bgd.tdkp-uzzp"><intent_id>1187294</intent_id><project_id>984631</project_id><text_data>Other Truck is a water truck, holds 4,000 gallons</text_data><comment_date>2021-10-29T00:00:00</comment_date></row><row _id="row-64if_76nu~sv2z" _uuid="00000000-0000-0000-A2CD-3FA53635F84C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-64if_76nu~sv2z"><intent_id>570623</intent_id><project_id>711436</project_id><text_data>11722 E. Fairview Spokane Valley 9920614416 E. Alki Spokane Valley 99216148 E. Fairview	Spokane 992072328 E. Rockwell Spokane 992077919 N. Altamont Spokane 992174112 E. Center #49 Mead	9902112516 W. 20th #28 Airway Hts 990011903 N. Salmon River Ln	Spokane Valley	990162503 N. Washington Spokane 992051617 E. Joseph	Spokane	9920818726 E. Valleyway Ct Greenacres 99016427 E. Walton Spokane 992085703 N. Maple Spokane 9920521322 N. Yale Ln #trailer Colbert 990053803 W. Greenwood #24B	Spokane	992242024 E. Decatur	Spokane	992081307 E. Central	Spokane	992088419 E. Nora Spokane Valley 992122218 E. Nebraska Spokane 9920821610 N. Mt Spokane Park Dr. Mead 99021</text_data><comment_date>2013-05-20T00:00:00</comment_date></row><row _id="row-568q-p6fh_r9a3" _uuid="00000000-0000-0000-D0B8-B69C1B02992F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-568q-p6fh_r9a3"><intent_id>993580</intent_id><project_id>882745</project_id><text_data>Irrigation and Landscaping</text_data><comment_date>2019-07-22T00:00:00</comment_date></row><row _id="row-sk87~5g7b~znjp" _uuid="00000000-0000-0000-F797-3A4E84A840A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sk87~5g7b~znjp"><intent_id>985548</intent_id><project_id>884654</project_id><text_data>ALSO FIRE JOBS#1065F-43766, 43768, 43769, 43765, 43764 &amp; 43767 ALSO SECURITY JOBS#1065C-43775, 43773, 43778, 43779, 43780, 43777 &amp; 43774</text_data><comment_date>2019-06-18T00:00:00</comment_date></row><row _id="row-5655-9m3n.sd36" _uuid="00000000-0000-0000-BD68-3D78D58BDDFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5655-9m3n.sd36"><intent_id>656885</intent_id><project_id>745276</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 5e for voice (telephone) and data (computer networking )indoors</text_data><comment_date>2014-09-25T00:00:00</comment_date></row><row _id="row-2i72-8pc5-akn9" _uuid="00000000-0000-0000-7AC1-25A0F45BFF41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2i72-8pc5-akn9"><intent_id>652915</intent_id><project_id>686785</project_id><text_data>C12012</text_data><comment_date>2014-09-08T00:00:00</comment_date></row><row _id="row-yw3i_4qpi_8in6" _uuid="00000000-0000-0000-03DE-8EEEF1E7F77C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yw3i_4qpi_8in6"><intent_id>1245629</intent_id><project_id>907022</project_id><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-sqmh-mnup_xp8a" _uuid="00000000-0000-0000-8F35-EB4A7247EB28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqmh-mnup_xp8a"><intent_id>950382</intent_id><project_id>867050</project_id><text_data>--ON 11/27/2018--Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2018-12-12T00:00:00</comment_date></row><row _id="row-f4mf~y496-a6j3" _uuid="00000000-0000-0000-A25A-AA3297D7C4BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f4mf~y496-a6j3"><intent_id>776164</intent_id><project_id>787407</project_id><text_data>Truck Driver: Water Tank Truck (0-3000) gallons. Purpose: Dust control.</text_data><comment_date>2016-07-20T00:00:00</comment_date></row><row _id="row-45px-paic~n7y5" _uuid="00000000-0000-0000-5F9F-32D5A0C0D892" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-45px-paic~n7y5"><intent_id>1228270</intent_id><project_id>1010081</project_id><text_data>1.- General weatherization /Repairs/ Energy upgrades.2.- Single home3.- 2 levels4.- a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-no.5.- yes6.- yes7.- no8.- no</text_data><comment_date>2022-04-25T00:00:00</comment_date></row><row _id="row-45j6-3xz4-w6ua" _uuid="00000000-0000-0000-5EAF-819E6824B8D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-45j6-3xz4-w6ua"><intent_id>655548</intent_id><project_id>744748</project_id><text_data>Job # 208719</text_data><comment_date>2014-09-18T00:00:00</comment_date></row><row _id="row-ycn7-8sak_e37k" _uuid="00000000-0000-0000-1695-6F34825F4B6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ycn7-8sak_e37k"><intent_id>1173103</intent_id><project_id>968437</project_id><text_data>JCI Project # 621586101</text_data><comment_date>2021-08-27T00:00:00</comment_date></row><row _id="row-6xdj_2g9e.biai" _uuid="00000000-0000-0000-DE03-D293214F9148" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xdj_2g9e.biai"><intent_id>873849</intent_id><project_id>837042</project_id><text_data>Single family residence insulation and weatherization upgrade</text_data><comment_date>2017-11-08T00:00:00</comment_date></row><row _id="row-wdan_pdyi.29pp" _uuid="00000000-0000-0000-E5F3-AF34A33FC820" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wdan_pdyi.29pp"><intent_id>688981</intent_id><project_id>759941</project_id><text_data>TELECOMMUNICATION TECHNICIANS WORK DESCRIPTIONProvide and install network and telephone cable between instruments, terminals and sets and the connections to the distribution cable.Provide and install Blocks and Subpanels where large feed cables terminate at the distribution frames in the IDF or MDFProvide and install riser cables between floors from the MDF to the IDFLabel and test the cableINDOOR INSTALLATION</text_data><comment_date>2015-04-14T00:00:00</comment_date></row><row _id="row-zdr5-er96-2cuh" _uuid="00000000-0000-0000-81C1-02408141250F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdr5-er96-2cuh"><intent_id>527780</intent_id><project_id>693600</project_id><text_data>Sent email:  Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance, cleaning, and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor).  For this Intent filing firms are to enter �Time and Materials� for  the dollar amount of the contract as an exact dollar amount cannot be identified at the time of filing. To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  When filing these forms, the dollar amount of the contract (which is the total amount that will be invoiced), including tax, will be entered on the form along with a short explanation in the notes section about the nature of the work so that the project can be tracked by the awarding agency and L&amp;I. In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures.  Please note that an on-call/blanket/annual contract may not be utilized for construction projects, new equipment purchase/installations, or for warranty work as these require their own set of Intent and Affidavit forms with the appropriate bid and award dates associated with those specific contracts.  The use of on-call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period and Affidavits will then be filed off of that new form.  If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work.On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out.  This form filing requirement also applies to owner/operators.  Please follow this filing method on any contracts covered under this policy.  (RCW 39.12.040)We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.  A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2012-08-14T00:00:00</comment_date></row><row _id="row-9ksi-u8pb_hwzk" _uuid="00000000-0000-0000-DA4B-7F155427CCF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ksi-u8pb_hwzk"><intent_id>616276</intent_id><project_id>729134</project_id><text_data>Job # 203813</text_data><comment_date>2014-02-13T00:00:00</comment_date></row><row _id="row-iy28.k4zh-svkf" _uuid="00000000-0000-0000-30BB-0A6DDBF3A309" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iy28.k4zh-svkf"><intent_id>1089618</intent_id><project_id>932604</project_id><text_data>Project# 02445, Tyler, Larry, 12121 E 10th, Spokane Valley, WA 99206</text_data><comment_date>2020-09-24T00:00:00</comment_date></row><row _id="row-k4h3_2u5p-fj5j" _uuid="00000000-0000-0000-9319-01787205F08E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k4h3_2u5p-fj5j"><intent_id>718136</intent_id><project_id>764926</project_id><text_data>We may or may not use apprentices on this project</text_data><comment_date>2015-09-01T00:00:00</comment_date></row><row _id="row-wbp7.w6cw~qkmj" _uuid="00000000-0000-0000-7CA1-E5170A3EB7FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wbp7.w6cw~qkmj"><intent_id>711278</intent_id><project_id>739369</project_id><text_data>Fringe Breakdown:$15.19---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $8.19 Pension</text_data><comment_date>2015-07-31T00:00:00</comment_date></row><row _id="row-rsii.i5rr~4rmw" _uuid="00000000-0000-0000-8C79-0B1511C683C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rsii.i5rr~4rmw"><intent_id>1066897</intent_id><project_id>923063</project_id><text_data>VE # 30001070</text_data><comment_date>2020-06-22T00:00:00</comment_date></row><row _id="row-xb66~2faa.xht6" _uuid="00000000-0000-0000-1DF7-D5B54BA61E22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xb66~2faa.xht6"><intent_id>674885</intent_id><project_id>703141</project_id><text_data>I have no Journeymen listed.</text_data><comment_date>2015-01-15T00:00:00</comment_date></row><row _id="row-5vs9~d8hx.2jgb" _uuid="00000000-0000-0000-C4BD-3224C2E9C7D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vs9~d8hx.2jgb"><intent_id>530175</intent_id><project_id>678856</project_id><text_data>123080 BITP Primary</text_data><comment_date>2012-08-22T00:00:00</comment_date></row><row _id="row-k3a4_kcsr~q5hn" _uuid="00000000-0000-0000-B45F-E25C967F0A82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3a4_kcsr~q5hn"><intent_id>1027121</intent_id><project_id>902127</project_id><text_data>#1-We were contracted to repair the oil furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2019-12-16T00:00:00</comment_date></row><row _id="row-x86f~dpsd.e3z6" _uuid="00000000-0000-0000-C74E-06BD03F5E0DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x86f~dpsd.e3z6"><intent_id>1283341</intent_id><project_id>1040738</project_id><text_data>pour #2 of 3 yards of the total 6 yards of concrete</text_data><comment_date>2022-11-14T00:00:00</comment_date></row><row _id="row-vtrs.peaf.6bi6" _uuid="00000000-0000-0000-340A-1FBFE8770499" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vtrs.peaf.6bi6"><intent_id>666821</intent_id><project_id>749307</project_id><text_data>Clean homeless camp in VaultHazWaste Workers to clean vault and surrounding area of all debris using brooms, shovels and/or small hand tools</text_data><comment_date>2014-11-21T00:00:00</comment_date></row><row _id="row-cgfx~wp3i~78an" _uuid="00000000-0000-0000-719E-98676C75C593" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cgfx~wp3i~78an"><intent_id>783718</intent_id><project_id>792569</project_id><text_data>The scope of work involves relandscaping an island flower bed in the median of Hostmark Street following a new water line installation by contractor. As a sub contractor we will install 60 feet of PVC for a sprinkler system, add 6&amp;quot; of topsoil, plant over 112 plants and spread 4 yards of bark. The only equipment used will be wheelbarrows, shovels and rakes.</text_data><comment_date>2016-08-30T00:00:00</comment_date></row><row _id="row-3a7f_sbkc-xfvr" _uuid="00000000-0000-0000-340C-283DD7469C5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3a7f_sbkc-xfvr"><intent_id>662981</intent_id><project_id>730237</project_id><text_data>Form filed by: Cathy StreleskiProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2014-10-29T00:00:00</comment_date></row><row _id="row-tm35_rr92~iswx" _uuid="00000000-0000-0000-A4AB-1351E0C8CAC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tm35_rr92~iswx"><intent_id>1035830</intent_id><project_id>901526</project_id><text_data>This project is the construction of the improvements to the SPD North Precinct in Seattle. Our work includes the preparation of soil for planting, and seed or sod. We will install an underground sprinkler system less than 3 feet. We will trench by hand using shovels and a mini excavator under 90 hp to 12' to 18'. We will install PVC pipe, sprinkler heads backfilling the trench with 3' sand using a backhoe under 90 jp. For landscaping, we will place 8' of planting topsoil down, plant trees, shrubs and ground cover using both a mini excavator and a backhoe, both under 90 hp.</text_data><comment_date>2020-02-04T00:00:00</comment_date></row><row _id="row-kqwa-vfzr.z2dq" _uuid="00000000-0000-0000-BED0-258DD2CEA0C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kqwa-vfzr.z2dq"><intent_id>1127859</intent_id><project_id>911459</project_id><text_data>Other Truck - Water TruckOther Truck - Lowboy Heavy Duty Trailer</text_data><comment_date>2021-03-10T00:00:00</comment_date></row><row _id="row-462v-4tak-adxe" _uuid="00000000-0000-0000-C906-F5D5B3DED276" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-462v-4tak-adxe"><intent_id>1318068</intent_id><project_id>1062421</project_id><text_data>9904929</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-2yjn-wx6v~4956" _uuid="00000000-0000-0000-D89D-511029369BC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2yjn-wx6v~4956"><intent_id>1097148</intent_id><project_id>936889</project_id><text_data>job 304924, 7001 Seaview avejob 304925, 25 S Horton St</text_data><comment_date>2020-10-20T00:00:00</comment_date></row><row _id="row-7h33.9uhj~zjnq" _uuid="00000000-0000-0000-2AAA-2FAD7B589884" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7h33.9uhj~zjnq"><intent_id>762616</intent_id><project_id>741211</project_id><text_data>Filed by Sierra StackmanLabor Ready Northwest Inc is a temporary labor service provider and is therefore exempt from the requirement to obtain a contractors license.Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2016-05-17T00:00:00</comment_date></row><row _id="row-hxke_sqbg_w5tw" _uuid="00000000-0000-0000-5626-F8ABE94C5713" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxke_sqbg_w5tw"><intent_id>1084598</intent_id><project_id>931030</project_id><text_data>Videowall system testing and commissioning</text_data><comment_date>2020-09-01T00:00:00</comment_date></row><row _id="row-2m29_x87v_pemv" _uuid="00000000-0000-0000-5DDA-FF333468FF28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2m29_x87v_pemv"><intent_id>958298</intent_id><project_id>872281</project_id><text_data>PC1 Job #4178CB</text_data><comment_date>2019-02-01T00:00:00</comment_date></row><row _id="row-fwuv~tk6r-nruq" _uuid="00000000-0000-0000-ED31-5C9326E7D921" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fwuv~tk6r-nruq"><intent_id>554519</intent_id><project_id>704123</project_id><text_data>Multiple Sites:  Intent for February jobs, 2010 Front St. #25, Lynden, WA</text_data><comment_date>2013-02-04T00:00:00</comment_date></row><row _id="row-rq8y.v8kt-aajr" _uuid="00000000-0000-0000-846A-A023BFE0AB37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rq8y.v8kt-aajr"><intent_id>948439</intent_id><project_id>867675</project_id><text_data>Elect tech(06)inside workLAN(Local Area Network)provide labor to install cabling for WAPS in the Theatre</text_data><comment_date>2018-11-30T00:00:00</comment_date></row><row _id="row-9d5i_rzr3.es87" _uuid="00000000-0000-0000-2D6E-B4277E506622" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9d5i_rzr3.es87"><intent_id>709554</intent_id><project_id>768167</project_id><text_data>On call/as needed contract for water/fire/mold/asbestos/bio clean up &amp; restoration servicesThis intent is filed to cover various properties included in an on call/as needed three year contract. Answers to residential questions will be included as required on a per project basis on affidavits. Due to the emergency nature of restoration work, it is not possible to provide the residential details until specific projects are known.</text_data><comment_date>2015-07-23T00:00:00</comment_date></row><row _id="row-vjkb_untv.8f5h" _uuid="00000000-0000-0000-3B78-FBB73B001B71" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vjkb_untv.8f5h"><intent_id>852444</intent_id><project_id>827209</project_id><text_data>170284</text_data><comment_date>2017-08-03T00:00:00</comment_date></row><row _id="row-43ra.2uvb~wyr2" _uuid="00000000-0000-0000-59D9-549881A38064" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-43ra.2uvb~wyr2"><intent_id>902173</intent_id><project_id>845265</project_id><text_data>Planting grass through hydroseed.</text_data><comment_date>2018-05-02T00:00:00</comment_date></row><row _id="row-wuk5~i4g5-982r" _uuid="00000000-0000-0000-7B5F-74358947EE28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wuk5~i4g5-982r"><intent_id>1006011</intent_id><project_id>823121</project_id><text_data>Due to some mixed up information, this intent is replacing 2 others - please delete intent ID 997324 and intent ID 998433. Thank you.</text_data><comment_date>2019-09-10T00:00:00</comment_date></row><row _id="row-482q_kwjk~nr8u" _uuid="00000000-0000-0000-ED12-21ECB287DA16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-482q_kwjk~nr8u"><intent_id>1200736</intent_id><project_id>992668</project_id><text_data>The truck is a 2007 International Toter. Thru truck hooks onto the building and hauls it.</text_data><comment_date>2022-01-07T00:00:00</comment_date></row><row _id="row-3azt.cf4z.jmtu" _uuid="00000000-0000-0000-3C63-8B5E573B6515" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3azt.cf4z.jmtu"><intent_id>1057594</intent_id><project_id>876867</project_id><text_data>Sub-Tier Install only for Stone</text_data><comment_date>2020-05-12T00:00:00</comment_date></row><row _id="row-7a84.y9yp_ui3i" _uuid="00000000-0000-0000-A9CA-C57E963CB280" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7a84.y9yp_ui3i"><intent_id>902563</intent_id><project_id>849912</project_id><text_data>#1-We were contracted to install a new Oil Furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2018-05-03T00:00:00</comment_date></row><row _id="row-u4yx~iyea~2k6w" _uuid="00000000-0000-0000-C97D-4AF80B4A7614" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u4yx~iyea~2k6w"><intent_id>1028614</intent_id><project_id>902922</project_id><text_data>#1-We were contracted to install 2 heat runs. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2019-12-24T00:00:00</comment_date></row><row _id="row-pugm_pfga.q2mi" _uuid="00000000-0000-0000-972A-10436973694D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pugm_pfga.q2mi"><intent_id>725453</intent_id><project_id>774304</project_id><text_data>Replace 30 feet of water main and add two chemical injection points</text_data><comment_date>2015-10-09T00:00:00</comment_date></row><row _id="row-zrfi-hhpw-8t8c" _uuid="00000000-0000-0000-99E9-6F01D4D65665" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zrfi-hhpw-8t8c"><intent_id>861443</intent_id><project_id>832110</project_id><text_data>This project will consist of weeding and pruning the landscaped Islands on 522 between Ballinger way and 145th. Equipment to be used will include, hoes, rakes, buckets, hand shears, and a blower to clean up any mess made from the work.</text_data><comment_date>2017-09-08T00:00:00</comment_date></row><row _id="row-zuby.jajb~ksxn" _uuid="00000000-0000-0000-E6F2-C25B5C9E5623" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zuby.jajb~ksxn"><intent_id>1127208</intent_id><project_id>940292</project_id><text_data>Concrete Ready Mix Deliveries</text_data><comment_date>2021-03-08T00:00:00</comment_date></row><row _id="row-6pgw.k7kp_vimp" _uuid="00000000-0000-0000-E63D-F4114D0607DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6pgw.k7kp_vimp"><intent_id>837407</intent_id><project_id>823122</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.</text_data><comment_date>2017-06-01T00:00:00</comment_date></row><row _id="row-n6b8~qeie.ja5d" _uuid="00000000-0000-0000-628E-177D606614B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n6b8~qeie.ja5d"><intent_id>685647</intent_id><project_id>751691</project_id><text_data>Fringe = $4.81 Health + $0.25 401K</text_data><comment_date>2015-03-25T00:00:00</comment_date></row><row _id="row-c9qu-ha8b_acph" _uuid="00000000-0000-0000-EB54-1B60F16B2C75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9qu-ha8b_acph"><intent_id>484799</intent_id><project_id>675508</project_id><text_data>Sub Contractor or labor supplier- CLP Resources, UBI #601921884</text_data><comment_date>2011-10-26T00:00:00</comment_date></row><row _id="row-awu7~vfju-uju2" _uuid="00000000-0000-0000-36CD-583EACF6D76A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-awu7~vfju-uju2"><intent_id>662512</intent_id><project_id>744165</project_id><text_data>1-repipe water system 2-apartment 3-3 stories including daylight style basement 4-a no, b no, c yes, d no, e no, f no, g no, h no, I no, j yes, k na 5-yes 6-yes 7-yes 8-no</text_data><comment_date>2014-10-27T00:00:00</comment_date></row><row _id="row-j6k6.yqg6~qkxe" _uuid="00000000-0000-0000-407E-4FD140DC7CBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j6k6.yqg6~qkxe"><intent_id>925200</intent_id><project_id>858562</project_id><text_data>46914 - Install low voltage cabling and entry control system devices</text_data><comment_date>2018-08-13T00:00:00</comment_date></row><row _id="row-w8m7.ptvs~36ax" _uuid="00000000-0000-0000-D20E-4CD6D90EAB9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w8m7.ptvs~36ax"><intent_id>449408</intent_id><project_id>614171</project_id><text_data>Move tools and windows on site.  Lift, hold and move windows, storefront and Curtain wall.  Glaziers are doing all installation of the IGO's, storefront, curtain wall and windows.</text_data><comment_date>2011-04-13T00:00:00</comment_date></row><row _id="row-pvqy~v9d2~98dk" _uuid="00000000-0000-0000-62F7-194B76D51BB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pvqy~v9d2~98dk"><intent_id>1013023</intent_id><project_id>871731</project_id><text_data>Truck is an F550  used to transport equipment and materials to and from the job site</text_data><comment_date>2019-10-08T00:00:00</comment_date></row><row _id="row-w6vs~zzjm~cmfy" _uuid="00000000-0000-0000-F798-8AC7E3FFF578" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w6vs~zzjm~cmfy"><intent_id>677242</intent_id><project_id>746593</project_id><text_data>MED DENTAL VISION LIFE $2.94VACA HOLIDAY $1.39</text_data><comment_date>2015-01-30T00:00:00</comment_date></row><row _id="row-vuk4_qm48.7q56" _uuid="00000000-0000-0000-7E34-FD08C9507F34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vuk4_qm48.7q56"><intent_id>1212337</intent_id><project_id>1000060</project_id><text_data>Trucks driven will be 8 to 10 foot utility vans hauling materials and equipment</text_data><comment_date>2022-02-17T00:00:00</comment_date></row><row _id="row-yh44_t6jy.cb4q" _uuid="00000000-0000-0000-F740-88AEBB44BA24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yh44_t6jy.cb4q"><intent_id>1050327</intent_id><project_id>900189</project_id><text_data>Wage/fringe above is an average, as each worker may have a different fringe rate because our medical benefits are not paid based on an hourly contribution, and vacation benefits are different depending on years of service.</text_data><comment_date>2020-04-08T00:00:00</comment_date></row><row _id="row-248k~vqbe~zm3s" _uuid="00000000-0000-0000-CAB1-EA69BE322DFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-248k~vqbe~zm3s"><intent_id>935924</intent_id><project_id>862561</project_id><text_data>Mountain View Elementary School 40236460 / 85093816</text_data><comment_date>2018-09-26T00:00:00</comment_date></row><row _id="row-f6qj-vzwf.wtdy" _uuid="00000000-0000-0000-E056-BC643056A62C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f6qj-vzwf.wtdy"><intent_id>987169</intent_id><project_id>885422</project_id><text_data>FILED BY HARRY L ENGSTON</text_data><comment_date>2019-06-24T00:00:00</comment_date></row><row _id="row-mnqx-djif_87kn" _uuid="00000000-0000-0000-B39D-D643F470B4E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mnqx-djif_87kn"><intent_id>1318066</intent_id><project_id>1062419</project_id><text_data>9913607</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-7h3v~8bbx~xzga" _uuid="00000000-0000-0000-2D4C-4C893432677D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7h3v~8bbx~xzga"><intent_id>974713</intent_id><project_id>879817</project_id><text_data>SPOKANE TRANSIT AUTHORITY SSP</text_data><comment_date>2019-04-30T00:00:00</comment_date></row><row _id="row-e56p.fyqk_2cze" _uuid="00000000-0000-0000-1712-09CD3CFE73B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e56p.fyqk_2cze"><intent_id>630933</intent_id><project_id>735473</project_id><text_data>This is a project to install bioswales at two locations.  Landscape portions of the project include installation of bio-rentention soil, plant materials from 4&amp;quot; pots up to 5 gal, bark chips &amp; wood mulch. as well as some drainage within 3 feet of finish grade</text_data><comment_date>2014-05-22T00:00:00</comment_date></row><row _id="row-2w7s.a6dp_rh7h" _uuid="00000000-0000-0000-6E1E-89CDCE122E9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2w7s.a6dp_rh7h"><intent_id>1318040</intent_id><project_id>1062404</project_id><text_data>9915522</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-xpbe-38je.ur75" _uuid="00000000-0000-0000-7D59-1680331B9AEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xpbe-38je.ur75"><intent_id>819252</intent_id><project_id>814921</project_id><text_data>#1 We are demoing and drying out a home that had vandalism and caused a water damage. #2 The structure is a single family dwelling. #3 One story #4 The home is used for rental. They house employees who rent it out from them. #4 A) NO #4 B) No #4C) Yes #4D)No #4E) No #4F)NO G)NO H) NO I)NO J)NO K)NO #5 YES #6)YES #7 NO #8 NO</text_data><comment_date>2017-03-07T00:00:00</comment_date></row><row _id="row-th23_mgti-k44c" _uuid="00000000-0000-0000-2870-4D17840A846B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-th23_mgti-k44c"><intent_id>869238</intent_id><project_id>835179</project_id><text_data>1. Home Repair2.Single Family Dwelling3.One Level4.a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no 5.yes6.yes7.no8.no</text_data><comment_date>2017-10-16T00:00:00</comment_date></row><row _id="row-mvjb-pbxd.giww" _uuid="00000000-0000-0000-EAAD-332C84F38CC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mvjb-pbxd.giww"><intent_id>715024</intent_id><project_id>763220</project_id><text_data>Filed by Bradley F. Harlow</text_data><comment_date>2015-08-18T00:00:00</comment_date></row><row _id="row-ux9i_sm4i-mv3k" _uuid="00000000-0000-0000-4025-1B583FBC5D21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ux9i_sm4i-mv3k"><intent_id>962807</intent_id><project_id>869154</project_id><text_data>1) HWT &amp; toilet replacement; leak repairs. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f) No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) Yes - manager office. 8) No.</text_data><comment_date>2019-03-01T00:00:00</comment_date></row><row _id="row-5fqy~wxri-4gzf" _uuid="00000000-0000-0000-6817-BE4EC5521A34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fqy~wxri-4gzf"><intent_id>956333</intent_id><project_id>871331</project_id><text_data>#20377, Ahmed, Eihab, 5908 N Ridgeview Pl. Spokane</text_data><comment_date>2019-02-06T00:00:00</comment_date></row><row _id="row-k9u6.6pgm.d6nf" _uuid="00000000-0000-0000-E37C-88B84C1B51CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k9u6.6pgm.d6nf"><intent_id>770915</intent_id><project_id>745915</project_id><text_data>PPC 16160</text_data><comment_date>2016-06-27T00:00:00</comment_date></row><row _id="row-vfi4~2v7d.tsxk" _uuid="00000000-0000-0000-E668-BCFAB8240551" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfi4~2v7d.tsxk"><intent_id>839779</intent_id><project_id>824085</project_id><text_data>The other truck is water truck used for dust control that holds less than 5000 gallons of water.</text_data><comment_date>2017-06-12T00:00:00</comment_date></row><row _id="row-qd5i.6nsc_bajr" _uuid="00000000-0000-0000-7E4C-0C998355AA98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qd5i.6nsc_bajr"><intent_id>848630</intent_id><project_id>827595</project_id><text_data>Driver will use a utility van to haul materials to job site.</text_data><comment_date>2017-07-19T00:00:00</comment_date></row><row _id="row-7x75~ptvx.wbwp" _uuid="00000000-0000-0000-A1C0-6CCCFA64D6CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7x75~ptvx.wbwp"><intent_id>572224</intent_id><project_id>707642</project_id><text_data>Form filed by:  Kelly Plimmer</text_data><comment_date>2013-05-29T00:00:00</comment_date></row><row _id="row-sds3~npyt~76w5" _uuid="00000000-0000-0000-9874-FE6009115652" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sds3~npyt~76w5"><intent_id>1235551</intent_id><project_id>1014418</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. BCI Project No. SJ9041Filed by Kathi Clark</text_data><comment_date>2022-05-23T00:00:00</comment_date></row><row _id="row-3g5t.um9y-g9cg" _uuid="00000000-0000-0000-2D90-15EC6A525640" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3g5t.um9y-g9cg"><intent_id>965580</intent_id><project_id>871992</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2019-03-15T00:00:00</comment_date></row><row _id="row-aawu.v7v3_43hi" _uuid="00000000-0000-0000-7565-E06640A394A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aawu.v7v3_43hi"><intent_id>946526</intent_id><project_id>866811</project_id><text_data>Work performed by the Telecommunication Technicians is installing Category 6 cabling for data indoors. 301 E MEADOWLANE RD SPOKANE, WA 99224</text_data><comment_date>2018-11-19T00:00:00</comment_date></row><row _id="row-fgzi~qy2h_gdhw" _uuid="00000000-0000-0000-160E-36DEC6259197" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fgzi~qy2h_gdhw"><intent_id>1284864</intent_id><project_id>1027085</project_id><text_data>7.32(health)+16.40(pension)+.70(training)+.05(apprenticeship)=24.47 total fringe7.55(health)+5.30(pension)+.95(apprenticeship)+.14(Northwest Laborers Employers Cooperation and Education Team)=13.94 total fringe</text_data><comment_date>2022-11-18T00:00:00</comment_date></row><row _id="row-usz7_h2fh~mrip" _uuid="00000000-0000-0000-F9E2-066C57C789B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-usz7_h2fh~mrip"><intent_id>1259507</intent_id><project_id>1010819</project_id><text_data>$71.30 per hour for a chain person is a ridiculously high rate.</text_data><comment_date>2022-08-18T00:00:00</comment_date></row><row _id="row-63mp.en7g~t5zi" _uuid="00000000-0000-0000-A8FC-FEB6113E0E84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-63mp.en7g~t5zi"><intent_id>997653</intent_id><project_id>889473</project_id><text_data>PROJECT IS EXEMPT FROM STATE PREVAILING WAGE REQUIREMENTS BASED ON THE HOUSING ACT OF 1937 AND 24 CFR 965,101. WORKERS WILL BE PAID IN ACCORDANCE WITH DAVIS BACON WAGE REQUIREMENTS FOR THE FOLLOWING CRAFTS/TRADES/OCCUPATIONS.</text_data><comment_date>2019-08-07T00:00:00</comment_date></row><row _id="row-dje7.6jrq_232v" _uuid="00000000-0000-0000-7614-3508CC9C2FE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dje7.6jrq_232v"><intent_id>1045659</intent_id><project_id>912594</project_id><text_data>S029751</text_data><comment_date>2020-03-16T00:00:00</comment_date></row><row _id="row-fnvx.5etk.2pcj" _uuid="00000000-0000-0000-C94E-F57146DACE23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fnvx.5etk.2pcj"><intent_id>995751</intent_id><project_id>888730</project_id><text_data>FILED BY MARTY YORK</text_data><comment_date>2019-07-30T00:00:00</comment_date></row><row _id="row-z9hz~pne5-jqb2" _uuid="00000000-0000-0000-32E7-54112B471D11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z9hz~pne5-jqb2"><intent_id>1263686</intent_id><project_id>1029245</project_id><text_data>WRS Job #P22-400PW9</text_data><comment_date>2022-09-02T00:00:00</comment_date></row><row _id="row-8cag.cy2e-7332" _uuid="00000000-0000-0000-381E-7075E1A09B01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8cag.cy2e-7332"><intent_id>998148</intent_id><project_id>888089</project_id><text_data>INSTALL CAT 6A CABLING ON THE INTERIOR/EXTERIOR OF THE BUILDINGS.  INSTALL FIBER OPTIC CABLING IN THE PARKING AREA AND ON EXTERIOR OF THE BUILDINGS.  ADDING CONDUIT PATH FOR DATA AND POWER FOR THE WAPS.  PROJECTS 514495 &amp; 514496</text_data><comment_date>2019-08-08T00:00:00</comment_date></row><row _id="row-kpzq.4uwu~ppac" _uuid="00000000-0000-0000-38DF-0D4212DF372D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kpzq.4uwu~ppac"><intent_id>482731</intent_id><project_id>676018</project_id><text_data>BRENDA BAKER8531 MAHONIA CT SEYELM, WA 98597</text_data><comment_date>2011-10-10T00:00:00</comment_date></row><row _id="row-dire.vrss.4u38" _uuid="00000000-0000-0000-82C7-E254010E7787" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dire.vrss.4u38"><intent_id>576112</intent_id><project_id>676228</project_id><text_data>--6/27/2012--Request to add the following note per Staci&amp;quot;Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR965-101.Workers will be paid in accordance with Davis-Bacon wage requirements For the following crafts/trades/occupations.&amp;quot;</text_data><comment_date>2013-06-18T00:00:00</comment_date></row><row _id="row-59y7~f32j_2wzp" _uuid="00000000-0000-0000-04C4-B7979937F22C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-59y7~f32j_2wzp"><intent_id>1004494</intent_id><project_id>892166</project_id><text_data>Correcting trade classification.</text_data><comment_date>2019-09-23T00:00:00</comment_date></row><row _id="row-cw4b.x65g~wbr9" _uuid="00000000-0000-0000-3896-6828E82BAB57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cw4b.x65g~wbr9"><intent_id>752446</intent_id><project_id>787720</project_id><text_data>remove old modulating valve and install new valve.  remove 8 screws, with a socket wrench and impact driver, and then redo with new screws with a socket wrench.  Adjust the settling by watching the water level.</text_data><comment_date>2016-03-21T00:00:00</comment_date></row><row _id="row-fcvt_3wsp.7sbr" _uuid="00000000-0000-0000-D09A-DB34E4B666CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fcvt_3wsp.7sbr"><intent_id>1214633</intent_id><project_id>1001478</project_id><text_data>Removal of old/damaged carpet, install of new carpetApartmentsTwo storiesNo to all questions A.- L.YesYesYesNo</text_data><comment_date>2022-03-01T00:00:00</comment_date></row><row _id="row-jyju_wqev_hhei" _uuid="00000000-0000-0000-0F4B-9FEC49722886" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jyju_wqev_hhei"><intent_id>917031</intent_id><project_id>855571</project_id><text_data>Truck Drivers / Other Trucks, it is a small semi truck used to deliver the modular structures to the job site</text_data><comment_date>2018-07-10T00:00:00</comment_date></row><row _id="row-piih~74u2.vfmr" _uuid="00000000-0000-0000-6AFA-4AFD321CA442" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-piih~74u2.vfmr"><intent_id>715760</intent_id><project_id>770427</project_id><text_data>Our laborers will monitor the setting of a turn-key modular restroom building at Farrel-McWhirter Park. They will dig the trenches using shovels to set the building&amp;#39;s pipes and conduit to the owner&amp;#39;s utility connections 6 feet from the building pad. Our laborers do not connect to outside utilities as this is the responsibility of the owner&amp;#39;s general contractor. Nothing more than simple hand tools and power tools such as battery operated hand drills are used by our laborers.</text_data><comment_date>2015-08-26T00:00:00</comment_date></row><row _id="row-i9jc~v6x8_8xdv" _uuid="00000000-0000-0000-4654-D3D243010519" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9jc~v6x8_8xdv"><intent_id>1278760</intent_id><project_id>1037579</project_id><text_data>Fringes: Vacation $5.50, Assessment $1.30, Insurance $9.46, Pension $16.03, Training $1.88, Industry Improvement $.50</text_data><comment_date>2022-10-28T00:00:00</comment_date></row><row _id="row-zwga~aup4~jy5u" _uuid="00000000-0000-0000-8A4B-7334A0EEBCC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zwga~aup4~jy5u"><intent_id>831653</intent_id><project_id>820175</project_id><text_data>PTI SO 132949</text_data><comment_date>2017-05-08T00:00:00</comment_date></row><row _id="row-vsvq~ftfu-fqfa" _uuid="00000000-0000-0000-440D-C506FFD3E95C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vsvq~ftfu-fqfa"><intent_id>1015892</intent_id><project_id>864398</project_id><text_data>The job is exempt from the payment of state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101.</text_data><comment_date>2019-11-05T00:00:00</comment_date></row><row _id="row-x7s6~4bya_5uh8" _uuid="00000000-0000-0000-C96A-4566256B4380" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x7s6~4bya_5uh8"><intent_id>513798</intent_id><project_id>687868</project_id><text_data>Other Trucks - Lowboy - Mobilization of Equipment (Teamsters Union)</text_data><comment_date>2012-05-30T00:00:00</comment_date></row><row _id="row-6xge.utpj.as3p" _uuid="00000000-0000-0000-0274-22C704915370" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xge.utpj.as3p"><intent_id>877943</intent_id><project_id>835361</project_id><text_data>1. TRUCK DRIVER - DRIVING TRUCK MOUNTED HYDROSEEDER AND SKID STEER2. NOZZELMAN - SPRAYING HYDROMULCHING AND OPERATING SKID STEER3. LANDSCAPE LABORER - LOADING SEED, FERTILIZER, MULCH INTO MACHINE BE HAND AND CLEANINGNOTE: ALL FRINGE IS PAID TO DAVIS BACONVESTING:Prevailing wage contribution. If the work you perform for the Employer is subject to prevailing wage laws, then the Employer will make contributions to this Plan to help satisfy the fringe benefit requirements of the law. You will receive this contribution based on work you perform during a Plan Year that is subject to the law. The contribution is 100% vested PARTICIPATION:If you are working under a prevailing wage contract, then for purposes of receiving any prevailing wage contribution made to the Plan, you are eligible to participate on the date your employment is covered under the contract and will enter the Plan on that date, unless the prevailing wage contract provides otherwise.</text_data><comment_date>2017-12-06T00:00:00</comment_date></row><row _id="row-4hqt.g8ty-unna" _uuid="00000000-0000-0000-16EE-2A4F365841B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4hqt.g8ty-unna"><intent_id>1060230</intent_id><project_id>920042</project_id><text_data>Haz Waste worker to clear area of all debris using shovel/rake/broomMotor Pat Grader to vacuum area of all sewage and transport to disposal facility</text_data><comment_date>2020-05-26T00:00:00</comment_date></row><row _id="row-hz58-2kkv_9dph" _uuid="00000000-0000-0000-1339-8DBEF24A4A0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hz58-2kkv_9dph"><intent_id>581590</intent_id><project_id>712755</project_id><text_data>MMFS Job#7336574</text_data><comment_date>2013-07-17T00:00:00</comment_date></row><row _id="row-j22i-34k4.79gd" _uuid="00000000-0000-0000-7503-BD5D2FF1C732" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j22i-34k4.79gd"><intent_id>1211566</intent_id><project_id>996861</project_id><text_data>Overall Project: Installation of water mains, Schedule D conduit/vaults, Temporary erosion/sediment control, roadside &amp; road way restoration, storage tanks/reservoir/pump station. Our project scope of work: Installlation of temporary High Visibility Silt Fence. Crew will use wheel barrows, shovels, and hammers to install the Fencing materials. We will remove the Fencing materials when directed by Prime Contractor. Apply Seed/Fertilizer/Mulch. We will use a Bowie hydroseeder. Seed, fertilizer, mulch and water are put into hydroseeder tank and applied with a Nozzle.</text_data><comment_date>2022-02-15T00:00:00</comment_date></row><row _id="row-suqv_b4t4_kmnz" _uuid="00000000-0000-0000-5296-A41F19D2818B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-suqv_b4t4_kmnz"><intent_id>853720</intent_id><project_id>829566</project_id><text_data>The contract date for this project changed in 2015.  The original contract expired 4/30/15.  The customer did a temporary extension for 5/1/15-9/30/15 and then it went out to bid during this time.  An intent was filed for the extension period of 5/1/15-9/30/15 (intent # 853812).  The job was re-awarded on 9/1/15.  The dates on this intent are valid.</text_data><comment_date>2017-09-07T00:00:00</comment_date></row><row _id="row-dqab~ib39.4dcz" _uuid="00000000-0000-0000-BBBB-195C9F7B5686" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dqab~ib39.4dcz"><intent_id>814090</intent_id><project_id>811068</project_id><text_data>8301 Tieton Drive#30Yakima WA 98908</text_data><comment_date>2017-02-02T00:00:00</comment_date></row><row _id="row-r3mj.h3aw_ddyh" _uuid="00000000-0000-0000-2660-6549808422DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r3mj.h3aw_ddyh"><intent_id>977648</intent_id><project_id>881043</project_id><text_data>Other Trucks - Water Truck</text_data><comment_date>2019-05-13T00:00:00</comment_date></row><row _id="row-8s3p~ry3d.h9if" _uuid="00000000-0000-0000-0BCF-A01A41227C42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8s3p~ry3d.h9if"><intent_id>1052069</intent_id><project_id>916026</project_id><text_data>Other truck: Lowboy for mobilization</text_data><comment_date>2020-04-16T00:00:00</comment_date></row><row _id="row-ks6k~g98r.44dm" _uuid="00000000-0000-0000-6CA9-33A1437646FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ks6k~g98r.44dm"><intent_id>683259</intent_id><project_id>757405</project_id><text_data>Other Trucks is Side Dumper</text_data><comment_date>2015-03-11T00:00:00</comment_date></row><row _id="row-wnd9-2kdh-kjf6" _uuid="00000000-0000-0000-5AA7-A2206ECFFEBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wnd9-2kdh-kjf6"><intent_id>1073486</intent_id><project_id>926032</project_id><text_data>Rolling Wheels will be performing all listed work. Demo of old manufactured home, using hand tools and excavator. Installation of new manufactured home, including site work. Installation includes leveling, blocking, skirting, and porches. We use normal construction equipment, along with driving work trucks.</text_data><comment_date>2020-07-28T00:00:00</comment_date></row><row _id="row-uu2u~kyyq-693z" _uuid="00000000-0000-0000-78F4-96F14CE39BBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uu2u~kyyq-693z"><intent_id>600740</intent_id><project_id>722503</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-10-22T00:00:00</comment_date></row><row _id="row-un3p~i2wy-i53p" _uuid="00000000-0000-0000-658F-B689B8C8719F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-un3p~i2wy-i53p"><intent_id>515763</intent_id><project_id>689140</project_id><text_data>Question #1 - The structure is an apartmentQuestion #2 - The structure is 2 stories tallQuestion #3 - The facility is a) Permanent Residence onlyQuestion #4 - Each Dwelling UNit has its own kitchenQuestion #5 - Each Dwelling unit has it's own BathroomQuestion #6 - There is a facilities managers office on-siteQuestion #7 - There is no public use of the facility</text_data><comment_date>2012-06-28T00:00:00</comment_date></row><row _id="row-2w7n-bun8.eah4" _uuid="00000000-0000-0000-DDB2-6390155BFB5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2w7n-bun8.eah4"><intent_id>557820</intent_id><project_id>705745</project_id><text_data>Invoice I0020725</text_data><comment_date>2013-02-26T00:00:00</comment_date></row><row _id="row-cdyh_njgr.6tq5" _uuid="00000000-0000-0000-5FFD-4E03AE994A25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cdyh_njgr.6tq5"><intent_id>758641</intent_id><project_id>790459</project_id><text_data>1) remove oil furnace,install gas furnace 2)single family 3) 2 stories 4) a:no, b:no, c:yes, d:no, e:no, f:no, g:no, h:no, i:no, j:no, k:na 5) one kitchen, single family 6) single family 7) no 8) no</text_data><comment_date>2016-04-26T00:00:00</comment_date></row><row _id="row-yfue.2qie.kmyp" _uuid="00000000-0000-0000-4681-E435094A8760" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yfue.2qie.kmyp"><intent_id>665165</intent_id><project_id>745776</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.The following are the addresses of the sites that will be renovated:Pineview 220 98th PL SE Everett, WA 98208Douglas Grove 9803 3rd AVE SE Everett, WA 98208Oakes 3322 Oakes Ave Everett, WA 98201Rucker 3327 Rucker AVE Everett, WA 98201Rainier Park 7326 Rainier Dr Everett, WA 98203BRidge Creek 7211 Rainier DR Everett, WA 98203Timber Hill 7720 Timber Hill DR Everett, WA 98203Madison Villa 3 West Madison St Everett, WA 98203</text_data><comment_date>2014-11-12T00:00:00</comment_date></row><row _id="row-i7rz_z9xv-bz2m" _uuid="00000000-0000-0000-5B07-73C71CCAB0FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7rz_z9xv-bz2m"><intent_id>593040</intent_id><project_id>714122</project_id><text_data>FIled by Jeanette Kitterman.</text_data><comment_date>2013-09-11T00:00:00</comment_date></row><row _id="row-cbga_73c5.cw8k" _uuid="00000000-0000-0000-DBD8-15891BF8DE55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cbga_73c5.cw8k"><intent_id>977529</intent_id><project_id>874254</project_id><text_data>A Truck Mounted Hydroseeder.</text_data><comment_date>2019-05-13T00:00:00</comment_date></row><row _id="row-8e8d-gzvm.e7r8" _uuid="00000000-0000-0000-84E7-0A98118C0BAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8e8d-gzvm.e7r8"><intent_id>1290502</intent_id><project_id>1045200</project_id><text_data>Invoice per quote</text_data><comment_date>2022-12-16T00:00:00</comment_date></row><row _id="row-dfc7-dgpg.5wf5" _uuid="00000000-0000-0000-855A-20605EE75D75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfc7-dgpg.5wf5"><intent_id>1105728</intent_id><project_id>908062</project_id><text_data>1200104 - Port Gamble S�Klallam Tribe Existing Clinic</text_data><comment_date>2020-11-24T00:00:00</comment_date></row><row _id="row-z3n7-enuf-xrzs" _uuid="00000000-0000-0000-D529-B8CB0BF883F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3n7-enuf-xrzs"><intent_id>1227568</intent_id><project_id>1009681</project_id><text_data>303766</text_data><comment_date>2022-04-21T00:00:00</comment_date></row><row _id="row-rkpz.nuch-x383" _uuid="00000000-0000-0000-EF0F-D951B8150CED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rkpz.nuch-x383"><intent_id>975951</intent_id><project_id>877778</project_id><text_data>Multiple Single Family Dwellings</text_data><comment_date>2019-05-06T00:00:00</comment_date></row><row _id="row-vckm_ujtu~tpxw" _uuid="00000000-0000-0000-A7EA-688AE82C7166" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vckm_ujtu~tpxw"><intent_id>1065065</intent_id><project_id>922295</project_id><text_data>Haz Waste workers to remove cylinder using small hand tools, wrenches</text_data><comment_date>2020-06-15T00:00:00</comment_date></row><row _id="row-knq2_m4s4-gsdf" _uuid="00000000-0000-0000-6BCF-4A915BA93620" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knq2_m4s4-gsdf"><intent_id>1255767</intent_id><project_id>1022451</project_id><text_data>0822104</text_data><comment_date>2022-08-08T00:00:00</comment_date></row><row _id="row-mrma_qggm-8xuj" _uuid="00000000-0000-0000-1E73-3CD207FDAF6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrma_qggm-8xuj"><intent_id>667814</intent_id><project_id>720081</project_id><text_data>We will be beautifying the area by hydroseeding. We will use a hydroseeder.</text_data><comment_date>2014-12-01T00:00:00</comment_date></row><row _id="row-re8g-bdme-ex6m" _uuid="00000000-0000-0000-333A-DE2086A966A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-re8g-bdme-ex6m"><intent_id>1205198</intent_id><project_id>876721</project_id><text_data>Fringe BreakdownHealth and Welfare $15.875Pension Plan $10.46Apprentice/Education Fund $0.64401(k) Annuity Fund $8.85Preservation Fund $0.54Vacation $4.62Holiday $1.91</text_data><comment_date>2022-02-07T00:00:00</comment_date></row><row _id="row-s978_9zq4.tijr" _uuid="00000000-0000-0000-81EF-623A2643130D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s978_9zq4.tijr"><intent_id>815344</intent_id><project_id>813205</project_id><text_data>Supply and install all required support pathways for data and voice cabling throughout the fire station. Installing data racks and patch panels. Terminate, label and test</text_data><comment_date>2017-02-10T00:00:00</comment_date></row><row _id="row-a4fe.h3qr-mzkx" _uuid="00000000-0000-0000-AB4F-0A33FF914E19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a4fe.h3qr-mzkx"><intent_id>889394</intent_id><project_id>844233</project_id><text_data>Maintenance of existing landscape in city park. Tasks: lawn mowing/edging, plant bed debris clean up, shrub pruning, weed removal, raking, and leaf removal.  Tools: gas powered lawn mowers 5 &amp; 11 hp, gas powered edgers, 2 cycle hand held line trimmers, 2 cycle leaf blowers, 2 cycle hedge shears, hand pruners, loppers and rakes.</text_data><comment_date>2018-02-21T00:00:00</comment_date></row><row _id="row-hmtu_b4t4-bkn5" _uuid="00000000-0000-0000-98F6-02987B06D1F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hmtu_b4t4-bkn5"><intent_id>1235436</intent_id><project_id>1014340</project_id><comment_date>2022-05-20T00:00:00</comment_date></row><row _id="row-r424-xfjb_kyqx" _uuid="00000000-0000-0000-F1EA-3E67EA783FEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r424-xfjb_kyqx"><intent_id>1228291</intent_id><project_id>1010095</project_id><text_data>Answer to additional inquiry: general labor tools include  cleaning rag, screw driver , oil.  clean and oil table top slicer All technicians use company supplied vehicles to arrive at job site*** 1. In order to finish processing your form, we need more information. Please specifically describe the duties being performed by the General Laborer and any tools, equipment, or vehicles used. You may provide this information in the �notes� section of your form. Thank you.</text_data><comment_date>2022-05-16T00:00:00</comment_date></row><row _id="row-rizx~rcvh~qvye" _uuid="00000000-0000-0000-EF61-EDAEF93591D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rizx~rcvh~qvye"><intent_id>952624</intent_id><project_id>847507</project_id><text_data>A.) provide a secondary access road to City of Ellensburg maintenance shop.B.) Mulching (2000 lbs per acre) - spread mulch using Bobcat and mini-excavator, seeding (hydroseeder), fertilizing and planting by hand.</text_data><comment_date>2019-02-07T00:00:00</comment_date></row><row _id="row-gv5h~j3jp-xr2z" _uuid="00000000-0000-0000-4522-B901CC179249" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gv5h~j3jp-xr2z"><intent_id>616924</intent_id><project_id>690362</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2014-02-19T00:00:00</comment_date></row><row _id="row-5ujf-hcth.uk3h" _uuid="00000000-0000-0000-C800-FDEB27B55502" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ujf-hcth.uk3h"><intent_id>967646</intent_id><project_id>874117</project_id><text_data>FILED BY JUDY STADELI</text_data><comment_date>2019-03-26T00:00:00</comment_date></row><row _id="row-vb86_2q7f~4psv" _uuid="00000000-0000-0000-2B58-B1B1FA6CD94B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vb86_2q7f~4psv"><intent_id>1101192</intent_id><project_id>936359</project_id><text_data>'Other Truck' is a Water Truck</text_data><comment_date>2020-11-13T00:00:00</comment_date></row><row _id="row-fj9v-yuat.d7a8" _uuid="00000000-0000-0000-A424-6591DA8CD849" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fj9v-yuat.d7a8"><intent_id>949490</intent_id><project_id>868122</project_id><text_data>This project was broken into two phases.  This is for the landscape maintenance portion ending 5/10/2020 ONLY.  Work to be performed by Watershed Environmental Solutions LLC.  WATERES939CZ   602756466</text_data><comment_date>2018-12-06T00:00:00</comment_date></row><row _id="row-yh7n-z86v_f2w7" _uuid="00000000-0000-0000-6783-0FA4CBEFC787" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yh7n-z86v_f2w7"><intent_id>784617</intent_id><project_id>797994</project_id><text_data>316656</text_data><comment_date>2016-08-24T00:00:00</comment_date></row><row _id="row-7hxs~3ypk_kuww" _uuid="00000000-0000-0000-D864-1E43312C6856" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7hxs~3ypk_kuww"><intent_id>1038629</intent_id><project_id>877147</project_id><text_data>Signed by Pete Arsenault - correction sent for contract amt - meah235</text_data><comment_date>2020-02-14T00:00:00</comment_date></row><row _id="row-i7t4.uzkp.2d5p" _uuid="00000000-0000-0000-8BC4-605AA336F534" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7t4.uzkp.2d5p"><intent_id>671327</intent_id><project_id>727630</project_id><text_data>JCI Project # 4088-0235</text_data><comment_date>2014-12-29T00:00:00</comment_date></row><row _id="row-ivit-x4n8.6pq9" _uuid="00000000-0000-0000-468C-E79A8A26C39B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ivit-x4n8.6pq9"><intent_id>770005</intent_id><project_id>795110</project_id><text_data>1)We were contracted to replace a panel 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2016-06-22T00:00:00</comment_date></row><row _id="row-xxcd~2ych.ut4f" _uuid="00000000-0000-0000-7222-6A5BAC1C6D1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xxcd~2ych.ut4f"><intent_id>1198123</intent_id><project_id>990987</project_id><text_data>Labor and materials for installation of low voltage telecommunications cabling inside a school building for the purpose of networking personal computers.</text_data><comment_date>2021-12-09T00:00:00</comment_date></row><row _id="row-eb2r.2pj2~tm48" _uuid="00000000-0000-0000-4742-34F23D8FB352" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eb2r.2pj2~tm48"><intent_id>729867</intent_id><project_id>774579</project_id><text_data>This marine job does not require the special Electrical Contractor&amp;#39;s license.</text_data><comment_date>2015-11-04T00:00:00</comment_date></row><row _id="row-g7pm~z8ad.38fs" _uuid="00000000-0000-0000-FC09-EF337224C2F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g7pm~z8ad.38fs"><intent_id>525327</intent_id><project_id>683021</project_id><text_data>This form is being approved on the basis of your statement that your employees will perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.</text_data><comment_date>2012-08-13T00:00:00</comment_date></row><row _id="row-di37.dmn2~bkwh" _uuid="00000000-0000-0000-79E9-093A7C83A0DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-di37.dmn2~bkwh"><intent_id>658005</intent_id><project_id>745679</project_id><text_data>1 repairs to home to prepare for sale.2. Single Family home3. Single Story4. a NO, b NO, c YES, d NO, e NO, f NO, g NO, h NO, i NO, j YES, k SINGLE FAMILY HOME5. Single Family Home6. One Bathroom7. NO8. NO</text_data><comment_date>2014-10-01T00:00:00</comment_date></row><row _id="row-dr8x_uvnc-ycfu" _uuid="00000000-0000-0000-321A-5A5E7C924AA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dr8x_uvnc-ycfu"><intent_id>689522</intent_id><project_id>760151</project_id><text_data>We will be setting up a 30&amp;#39;x90&amp;#39; Weathermax long term tent. It will be transported by box truck to the location. We will be using a pallet jack to move the ecology blocks to secure the tent.</text_data><comment_date>2015-04-21T00:00:00</comment_date></row><row _id="row-7b9q_xcpt.s95u" _uuid="00000000-0000-0000-38B2-E54E7F06A7FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7b9q_xcpt.s95u"><intent_id>1232732</intent_id><project_id>984082</project_id><text_data>We pay 100% Health Premiums as part of Fringe //CC</text_data><comment_date>2022-05-11T00:00:00</comment_date></row><row _id="row-hrcs_3w9m_v9xg" _uuid="00000000-0000-0000-4F6D-A49A396BC5A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hrcs_3w9m_v9xg"><intent_id>781574</intent_id><project_id>796128</project_id><text_data>sweeping</text_data><comment_date>2016-08-11T00:00:00</comment_date></row><row _id="row-bmjs~cb4e~um69" _uuid="00000000-0000-0000-072A-F921B417D261" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmjs~cb4e~um69"><intent_id>688078</intent_id><project_id>759529</project_id><text_data>Washed walls with cloths and cleaning chemical to remove oily substance. Ceiling height 15 feet scaffolding was used. Mopped floor as needed.</text_data><comment_date>2015-04-09T00:00:00</comment_date></row><row _id="row-mjbf-dam3~cwck" _uuid="00000000-0000-0000-F0DC-227C9E28A8AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mjbf-dam3~cwck"><intent_id>1234362</intent_id><project_id>1013742</project_id><text_data>TREE WORK FOR PAUL ANDERSON @ WEONA PARK</text_data><comment_date>2022-05-17T00:00:00</comment_date></row><row _id="row-bhyj_dack_nhx3" _uuid="00000000-0000-0000-CCE8-78A0A3B4A50A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bhyj_dack_nhx3"><intent_id>872228</intent_id><project_id>836375</project_id><text_data>Re-using this intent as I set up the other and it was under the incorrect lic #.... this is for 40781080 / 84455247</text_data><comment_date>2018-03-15T00:00:00</comment_date></row><row _id="row-ktgn-fvca-8xwn" _uuid="00000000-0000-0000-D4B5-C5C60F9B284C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ktgn-fvca-8xwn"><intent_id>851717</intent_id><project_id>824231</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK &amp;quot;POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)&amp;quot; USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2017-08-01T00:00:00</comment_date></row><row _id="row-qpk4-zcet_rfpx" _uuid="00000000-0000-0000-0635-08AE19BBF677" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qpk4-zcet_rfpx"><intent_id>589423</intent_id><project_id>715242</project_id><text_data>Federal Davis Bacon wage rates apply&amp;quot;Other Trucks&amp;quot; is End Dumping w/ a 50yd capacity</text_data><comment_date>2013-08-22T00:00:00</comment_date></row><row _id="row-wn9h_a8g5_rkwc" _uuid="00000000-0000-0000-A6B4-1D40CB570039" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wn9h_a8g5_rkwc"><intent_id>1104538</intent_id><project_id>940571</project_id><text_data>Positive Covid cleaning</text_data><comment_date>2020-11-19T00:00:00</comment_date></row><row _id="row-pjd8_ryru_2mfy" _uuid="00000000-0000-0000-47F2-305C2207BA1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjd8_ryru_2mfy"><intent_id>907824</intent_id><project_id>848193</project_id><text_data>0718037</text_data><comment_date>2018-05-30T00:00:00</comment_date></row><row _id="row-e3ha-ways~8ew2" _uuid="00000000-0000-0000-05EE-CEB3263F370A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e3ha-ways~8ew2"><intent_id>745783</intent_id><project_id>784672</project_id><text_data>Single family weatherization / Insulation upgrade</text_data><comment_date>2016-02-09T00:00:00</comment_date></row><row _id="row-2g7f~hb7b~84rd" _uuid="00000000-0000-0000-049D-6A88E783DF08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2g7f~hb7b~84rd"><intent_id>830689</intent_id><project_id>816286</project_id><text_data>We are a sub contractor unaware of general contractors work performed outside our scope of work</text_data><comment_date>2017-06-12T00:00:00</comment_date></row><row _id="row-bept~7kj7~a32n" _uuid="00000000-0000-0000-8602-F1E5A70C108B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bept~7kj7~a32n"><intent_id>951765</intent_id><project_id>869160</project_id><text_data>#20332, Stowers, Cheryl, 1205 E Lyons #128, Spokane#20341, Beck, Don, 3231 W Boone Ave #827, Spokane#20353, Clampffer, Tamara, 2330 E Sanson, Spokane#20344, Graham, David, 508 S Shoreline Dr. Liberty Lake#20342, Groshong, James, 6405 N Old Argonne, Spokane</text_data><comment_date>2019-01-15T00:00:00</comment_date></row><row _id="row-cany-wi6i.683b" _uuid="00000000-0000-0000-EAEA-C4D315BA423B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cany-wi6i.683b"><intent_id>854833</intent_id><project_id>829950</project_id><text_data>Emergency damage wire.</text_data><comment_date>2017-08-15T00:00:00</comment_date></row><row _id="row-6g83_exqr-mb34" _uuid="00000000-0000-0000-C3DA-B730C1098E23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6g83_exqr-mb34"><intent_id>546977</intent_id><project_id>696872</project_id><text_data>PEO DRIVING AND OPERATING VACUUM TRUCK LABORER IS HANDLING HOSESFRINGE2.01 MEDICAL AND DENTAL VISION AND LIFE.74 VACATION AND HOLIDAY</text_data><comment_date>2012-12-04T00:00:00</comment_date></row><row _id="row-6uvx-hud2~r52a" _uuid="00000000-0000-0000-62D9-AFB3912EABDC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6uvx-hud2~r52a"><intent_id>603753</intent_id><project_id>723631</project_id><text_data>Our L&amp;I account number is 04576950. So sorry!</text_data><comment_date>2013-11-15T00:00:00</comment_date></row><row _id="row-uj5b~4uvv-hdzg" _uuid="00000000-0000-0000-F6F0-813807AF7B45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uj5b~4uvv-hdzg"><intent_id>881987</intent_id><project_id>824889</project_id><text_data>GU Job #17359Truck Driver:  Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2018-01-05T00:00:00</comment_date></row><row _id="row-p9g3~nir4-tpmn" _uuid="00000000-0000-0000-167A-A468C4856ECF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p9g3~nir4-tpmn"><intent_id>860371</intent_id><project_id>831679</project_id><text_data>Our company, Emhill, Inc., dba Nu-Century Maintenance Systems, is a building service contractor that provides janitorial service to Green River College in Kent as well as Green River Auburn Center.The contract that was awarded to us by Green River College is for janitorial services performed 5 days a week, as well as periodic floor/window cleaning and restroom supplies. The subcontractors drive to the buildings with their own vehicles and perform the cleaning tasks outlined on Green River�s spec sheets.Equipment used includes vacuums, mops/ buckets, microfiber towels and Green certified cleaning chemicals.</text_data><comment_date>2017-09-05T00:00:00</comment_date></row><row _id="row-c7kf-6yah~4d7e" _uuid="00000000-0000-0000-3C21-6D741DEF8D7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c7kf-6yah~4d7e"><intent_id>1161283</intent_id><project_id>960468</project_id><text_data>Labor and materials for installation of CCTV system inside apartment buildings</text_data><comment_date>2021-07-19T00:00:00</comment_date></row><row _id="row-x9uk_t9nt.89ur" _uuid="00000000-0000-0000-2533-172E320AAEBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x9uk_t9nt.89ur"><intent_id>583788</intent_id><project_id>711665</project_id><text_data>Filed by Phillip Rasmussen</text_data><comment_date>2013-07-26T00:00:00</comment_date></row><row _id="row-grgv_h9h4_wpwd" _uuid="00000000-0000-0000-5C57-4F75E9631DDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-grgv_h9h4_wpwd"><intent_id>617125</intent_id><project_id>725239</project_id><text_data>Work to be performed will be hydroseeding of lawn areas with a 75hp Bowie hydroseeder</text_data><comment_date>2014-02-20T00:00:00</comment_date></row><row _id="row-3trn~pzkq~9bgs" _uuid="00000000-0000-0000-C784-3B02231BAE2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3trn~pzkq~9bgs"><intent_id>988562</intent_id><project_id>880371</project_id><text_data>1- General Weatherization/energy efficiency upgrades.2-.Apartments.3- 2 levels4- a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-no.5- yes.6- yes7- no8- no</text_data><comment_date>2019-06-28T00:00:00</comment_date></row><row _id="row-89kg~rwth-uhuz" _uuid="00000000-0000-0000-A733-7221C14724A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89kg~rwth-uhuz"><intent_id>972639</intent_id><project_id>878893</project_id><text_data>0819034</text_data><comment_date>2019-04-19T00:00:00</comment_date></row><row _id="row-s3vx.pwua.buhn" _uuid="00000000-0000-0000-F921-526E5811B117" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s3vx.pwua.buhn"><intent_id>634792</intent_id><project_id>721091</project_id><text_data>Contracted to measure fabricate (in our shop) then take back to install.#2Apartment-#3--4 levels- #4-low income people to live in-no commercial use, No retail, permanent residence building No E no, F no, g no, h no, I no, apartments not dorms</text_data><comment_date>2014-06-12T00:00:00</comment_date></row><row _id="row-6za9-wdhg_ssbe" _uuid="00000000-0000-0000-FF61-916DD47622A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6za9-wdhg_ssbe"><intent_id>685063</intent_id><project_id>724146</project_id><text_data>Intent for: 90193 BP99</text_data><comment_date>2015-03-23T00:00:00</comment_date></row><row _id="row-eb5s.krkf~x9jt" _uuid="00000000-0000-0000-147C-E090C0074ADE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eb5s.krkf~x9jt"><intent_id>1237513</intent_id><project_id>1015538</project_id><text_data>3:50Called out for a clogged mainline. Attempted to pull clean-out cap but could not use due to the hole in the wall being smaller than the clean-out cap itself. Pulled the wall hung toilet from the wall and used camera to manipulate the cable to go down the straight tee. Ran cable out about 35 feet and heard water drain from the flange. Cabled out 5 more feet and worked section of line. Pulled cable back while running water in the sink. Pulled back wipes on the cable end. Remounted the toilet and cleaned the work area. Recommend no wipes be flushed down the toilet. No guarantee due to wipes being flushed.</text_data><comment_date>2022-05-31T00:00:00</comment_date></row><row _id="row-3xys-edui~pys7" _uuid="00000000-0000-0000-55C6-8D4D9C9B53EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3xys-edui~pys7"><intent_id>1031082</intent_id><project_id>904244</project_id><text_data>Replaced Water Heater / 2. Yes / 3. Three / 4.  Commercial Apartment Complex / 5.  Yes / 6.  Yes / 7. Yes / 8.  Unknown</text_data><comment_date>2020-01-10T00:00:00</comment_date></row><row _id="row-xrf5.ay46~cc3h" _uuid="00000000-0000-0000-92AE-EB6CFD9C0C13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xrf5.ay46~cc3h"><intent_id>1186989</intent_id><project_id>976289</project_id><text_data>Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2021-10-21T00:00:00</comment_date></row><row _id="row-sfbz_drv6_b79m" _uuid="00000000-0000-0000-FA24-B896847DAD5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sfbz_drv6_b79m"><intent_id>1469424</intent_id><project_id>1146505</project_id><text_data>9944367</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-icdz~prr9~dxbr" _uuid="00000000-0000-0000-80FE-1122485C3AF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-icdz~prr9~dxbr"><intent_id>935972</intent_id><project_id>860897</project_id><text_data>*The work on this intent will be performed by our DBA company:  FireTek Design &amp; Installation</text_data><comment_date>2018-09-27T00:00:00</comment_date></row><row _id="row-xdzs-cere_drnc" _uuid="00000000-0000-0000-8124-807304CEF493" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdzs-cere_drnc"><intent_id>1224238</intent_id><project_id>1007681</project_id><text_data>no employees, sole proprietor</text_data><comment_date>2022-04-08T00:00:00</comment_date></row><row _id="row-ptqt~zqmk_xjr3" _uuid="00000000-0000-0000-6D44-FF99E48E61B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ptqt~zqmk_xjr3"><intent_id>1129655</intent_id><project_id>932648</project_id><text_data>Stoneway Concrete is a Supplier</text_data><comment_date>2021-03-18T00:00:00</comment_date></row><row _id="row-s9k8~bsqm.ri5q" _uuid="00000000-0000-0000-B031-9B1026C89121" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s9k8~bsqm.ri5q"><intent_id>768072</intent_id><project_id>791426</project_id><text_data>1116063</text_data><comment_date>2016-06-14T00:00:00</comment_date></row><row _id="row-c6ch.925r~ytr2" _uuid="00000000-0000-0000-25BF-F07CAD1D1633" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6ch.925r~ytr2"><intent_id>579751</intent_id><project_id>712343</project_id><text_data>Filed by: Luana ChurchProject is exempt from the payment of state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2013-07-08T00:00:00</comment_date></row><row _id="row-sdms.eptn.8jwz" _uuid="00000000-0000-0000-90E7-A66AE9B519FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sdms.eptn.8jwz"><intent_id>1217656</intent_id><project_id>1003488</project_id><text_data>WORK FOR RICK BAILEY @ 134TH PL SE</text_data><comment_date>2022-03-14T00:00:00</comment_date></row><row _id="row-6yfx-7tss-b2r6" _uuid="00000000-0000-0000-6D4E-C7EA59545C7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6yfx-7tss-b2r6"><intent_id>879353</intent_id><project_id>839481</project_id><text_data>Replacing light for light in apartments. This is a federal project so I&amp;#39;m using the federal prevailing wage of 19.35 per hour</text_data><comment_date>2017-12-14T00:00:00</comment_date></row><row _id="row-87mn~a2iu~85nm" _uuid="00000000-0000-0000-7279-C36B6A0C09BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87mn~a2iu~85nm"><intent_id>1229451</intent_id><project_id>983725</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2022-04-28T00:00:00</comment_date></row><row _id="row-5tcu.s4a5.iq5u" _uuid="00000000-0000-0000-193C-03103BC10974" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5tcu.s4a5.iq5u"><intent_id>677890</intent_id><project_id>754695</project_id><text_data>Form filed by:  Stuart A. Harr</text_data><comment_date>2015-02-04T00:00:00</comment_date></row><row _id="row-fnrk-28r8_qc72" _uuid="00000000-0000-0000-DB20-98B956A23855" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fnrk-28r8_qc72"><intent_id>1131333</intent_id><project_id>955654</project_id><text_data>Other Truck = Lowboy and Water Trucks</text_data><comment_date>2021-03-25T00:00:00</comment_date></row><row _id="row-ygn9-qnf2~7hfs" _uuid="00000000-0000-0000-A6B9-9CB83C9FF2A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ygn9-qnf2~7hfs"><intent_id>678445</intent_id><project_id>755365</project_id><text_data>--2/9/15--Laurie Lyons1)Install new water heater2)YES3)1 STORY-WITH BASEMENT4)a-no b-no c-yes d-no e-no f-no g-no h-no I-no j-no k-none5)YES6)YES7)NO8)NO</text_data><comment_date>2015-02-09T00:00:00</comment_date></row><row _id="row-kxn3_wvku_c5wg" _uuid="00000000-0000-0000-26EA-C3FD43DEBBF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kxn3_wvku_c5wg"><intent_id>503776</intent_id><project_id>684150</project_id><text_data>Client:  Nancy toner</text_data><comment_date>2012-03-13T00:00:00</comment_date></row><row _id="row-v8ha.2pah_dg3q" _uuid="00000000-0000-0000-758F-43E4660EC208" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8ha.2pah_dg3q"><intent_id>642473</intent_id><project_id>739824</project_id><text_data>Form filed by: Judy Winney</text_data><comment_date>2014-07-21T00:00:00</comment_date></row><row _id="row-3ng4~ntws_dqan" _uuid="00000000-0000-0000-3957-0B528A601E33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ng4~ntws_dqan"><intent_id>516299</intent_id><project_id>683900</project_id><text_data>Form filed by: Harold E Elli</text_data><comment_date>2012-06-12T00:00:00</comment_date></row><row _id="row-zb93_cqb2.7h2f" _uuid="00000000-0000-0000-896E-9674321C76F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zb93_cqb2.7h2f"><intent_id>648191</intent_id><project_id>737545</project_id><text_data>We will remove sod and install curbing in preparation for beds. Using hand tools such as shovels, rakes, pipe cutters, wheel barrels, &amp; etc. Equipment is less than 90 HP �small skit steer to carry trees and materials.</text_data><comment_date>2014-08-14T00:00:00</comment_date></row><row _id="row-9j26~gvbh-44w2" _uuid="00000000-0000-0000-2AC1-C576D60815AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9j26~gvbh-44w2"><intent_id>476888</intent_id><project_id>666911</project_id><text_data>PEASE AND SONS HIRED US</text_data><comment_date>2011-09-08T00:00:00</comment_date></row><row _id="row-6rfb~7gkj_4tmg" _uuid="00000000-0000-0000-1250-4B7D45BC9C90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6rfb~7gkj_4tmg"><intent_id>1009437</intent_id><project_id>817030</project_id><text_data>Job # 2381166 Fringe Benefits: $1.87 PTO $9.24 Health &amp; Welfare $5.55 Pension $2.00 IAP $0.08 Occup Haz $0.10 Int'l training Fund $1.15 Apprenticeship, Industry fund, LMCT _____ $19.99</text_data><comment_date>2019-09-24T00:00:00</comment_date></row><row _id="row-c95h_qj2g_dup7" _uuid="00000000-0000-0000-436F-557913755688" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c95h_qj2g_dup7"><intent_id>487292</intent_id><project_id>677528</project_id><text_data>We do not intend to hire any subcontactors or apprentices.Residential Rate Prevailing wage determinationIn order for us to determine if the residential rate is appropriately applied, please specifically answer the following questions about the facility: #1 - Is the structure a single family dwelling, duplex, apartment, condominium or other residential structure? Yes #2 - Including any basement or garage, how many stories or levels does the structure have? 1+ #3 - What is the facility used for?  --Answer �yes� or �no� to each of the following options: (a) Permanent residence only? Yes (b) Rehabilitation house? No (c) Transitional housing? No (d) Communal dining facility? No (e) Treatment services? No (f) Counseling? No (g) Other? No #4 - Does each dwelling unit have its own self-contained kitchen? Yes #5 - Does each dwelling unit have its own bathroom? Yes #6 - Is there a community facility or manager�s office on site? No #7 - Is any part of the facility used by members of the public? No</text_data><comment_date>2011-11-03T00:00:00</comment_date></row><row _id="row-5bif-6hfn-ikuh" _uuid="00000000-0000-0000-AB00-61D9C82E496E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bif-6hfn-ikuh"><intent_id>808299</intent_id><project_id>809880</project_id><text_data>COV JOC Project</text_data><comment_date>2016-12-21T00:00:00</comment_date></row><row _id="row-uq7m~83fr.upbk" _uuid="00000000-0000-0000-7AAD-40B90D4827C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uq7m~83fr.upbk"><intent_id>1190344</intent_id><project_id>986331</project_id><text_data>Equipment Operator installs underground conduit using a directional drill and the laborers track the location and depth of the drill head for accuracy. The laborer also uses a vac truck to locate existing utilities to avoid hitting them with the drill.</text_data><comment_date>2021-11-02T00:00:00</comment_date></row><row _id="row-yfwd-nws5-tg86" _uuid="00000000-0000-0000-65AC-707502B021D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yfwd-nws5-tg86"><intent_id>519739</intent_id><project_id>669073</project_id><text_data>1. Single family apatments2. 3 story3. Low income housinga. yesb. noc. nod. noe. nof. nog. no4. yes5. yes6. yes7. no</text_data><comment_date>2012-07-02T00:00:00</comment_date></row><row _id="row-ymwy~u4cm.xrd3" _uuid="00000000-0000-0000-F968-6752932DC162" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ymwy~u4cm.xrd3"><intent_id>985555</intent_id><project_id>880510</project_id><text_data>5020.190223</text_data><comment_date>2019-06-18T00:00:00</comment_date></row><row _id="row-2bjw_qpe2~iu2w" _uuid="00000000-0000-0000-4D9E-35FED3142BD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2bjw_qpe2~iu2w"><intent_id>874088</intent_id><project_id>816028</project_id><text_data>All work will be performed by Owner/Operator... Direct Tech has NO employees.</text_data><comment_date>2017-11-09T00:00:00</comment_date></row><row _id="row-an2h~y9g5_wa35" _uuid="00000000-0000-0000-6398-DC17B0878534" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-an2h~y9g5_wa35"><intent_id>1200966</intent_id><project_id>992784</project_id><text_data>Extra concrete and general carpentry work on Cougar Creek dumpster siteApartment complex 2Residential livinga)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no l)no5 yes6 yes7 yes8 no</text_data><comment_date>2022-02-09T00:00:00</comment_date></row><row _id="row-jfbt.g992_uz6w" _uuid="00000000-0000-0000-9578-B0D655E3B1C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jfbt.g992_uz6w"><intent_id>804382</intent_id><project_id>802120</project_id><text_data>Filed by Angie Drake&amp;quot;All work is done within the boundries of the Tulalip Reservation and there is no state or local funds involved in the project therefore state prevailing wages DO NOT apply. Per bid documentation federal decision number WA160001 Modification 4 dated 4-22-16 highway.</text_data><comment_date>2016-11-28T00:00:00</comment_date></row><row _id="row-p8kn~8bxd_gz8d" _uuid="00000000-0000-0000-092F-DF22928C0A80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p8kn~8bxd_gz8d"><intent_id>773374</intent_id><project_id>788583</project_id><text_data>PPC 16092</text_data><comment_date>2016-07-08T00:00:00</comment_date></row><row _id="row-ximn-th9r_qph8" _uuid="00000000-0000-0000-07CA-CC66DA5B7BC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ximn-th9r_qph8"><intent_id>546147</intent_id><project_id>700391</project_id><text_data>The scope for this project is to install fiber optic cables from the operations phone room to the decant and septage buildings</text_data><comment_date>2012-11-28T00:00:00</comment_date></row><row _id="row-nibc.9rqf.fbf7" _uuid="00000000-0000-0000-E034-A782E0D43039" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nibc.9rqf.fbf7"><intent_id>1070498</intent_id><project_id>924641</project_id><text_data>Other Truck4000 gallon on road. Water truck use for dust control and compaction. A-frame Truck (2 or more drums)Water Wagon use for dust control and compaction. (has been selected under the power equipment)</text_data><comment_date>2020-07-07T00:00:00</comment_date></row><row _id="row-uiyv-468x_nqic" _uuid="00000000-0000-0000-48FF-A90E9902206C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uiyv-468x_nqic"><intent_id>1222585</intent_id><project_id>1000872</project_id><text_data>Fringes:  Health = $8.05; Pension = $5.68; Training = $0.35</text_data><comment_date>2022-04-01T00:00:00</comment_date></row><row _id="row-qadg-6hn5-3nwx" _uuid="00000000-0000-0000-A9B5-FE501EB9AB8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qadg-6hn5-3nwx"><intent_id>1084909</intent_id><project_id>931201</project_id><text_data>? The installation will be fully BICSI EIA/TIA 802.3 compliant in regards to pathway provisions and installation of thecabling. This includes testing and documentation, as well as following NEC requirements.? CTS is responsible for site cleanup, storage of materials and tools prior to leaving site each night.? Supply and install 4pr UTP Cat6 cable from appropriate MDF to each workstation outlet.? Create and implement a labeling scheme that is compliant to EIA/TIA 606 and per customer�s approval.? Update as-built drawings to show exact location of all new cable drops and label scheme assigned to each cable drop.? Installation of [014] new data cables to [004] locations as shown on site survey.? Supply and install materials to support an open pathway, such as J-hooks and hangers where possible.? Terminate new data cables within MDF location as specified to new 24prt Cat6 patch panel.? Terminate new data cables at workstation with Cat6 RJ45 insert.</text_data><comment_date>2020-09-01T00:00:00</comment_date></row><row _id="row-cxj6~dhxc_eefp" _uuid="00000000-0000-0000-7CF8-AE15169501CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxj6~dhxc_eefp"><intent_id>761625</intent_id><project_id>791782</project_id><text_data>Roofer trade was added last Friday along with Nozzleman.  We are done with this project and need to get this intent approves in order to file the affidavit of wages so we can get paid.  He had the following categories of workers on this job: Laborers, Painters, Nozzleman &amp; Roofers.</text_data><comment_date>2016-06-07T00:00:00</comment_date></row><row _id="row-jn8z~qxr4.w7bq" _uuid="00000000-0000-0000-998B-C188FE1F0531" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jn8z~qxr4.w7bq"><intent_id>881521</intent_id><project_id>840556</project_id><text_data>Job #113684-001</text_data><comment_date>2018-01-03T00:00:00</comment_date></row><row _id="row-qc73~aar4_wn63" _uuid="00000000-0000-0000-A470-DC4883625588" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qc73~aar4_wn63"><intent_id>1469299</intent_id><project_id>1146429</project_id><text_data>9953888</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-8i7c.4nhu.ayvk" _uuid="00000000-0000-0000-A050-0F36A0DE6A35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8i7c.4nhu.ayvk"><intent_id>995139</intent_id><project_id>888479</project_id><text_data>Adler project #19-065</text_data><comment_date>2019-07-27T00:00:00</comment_date></row><row _id="row-h2ms-7b5u-qp64" _uuid="00000000-0000-0000-991B-564CE6AA78DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2ms-7b5u-qp64"><intent_id>892082</intent_id><project_id>814637</project_id><text_data>Filed by Dave Hill</text_data><comment_date>2018-03-09T00:00:00</comment_date></row><row _id="row-gyi7_7wdh_rfex" _uuid="00000000-0000-0000-393F-C7B7764914D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gyi7_7wdh_rfex"><intent_id>733847</intent_id><project_id>777925</project_id><text_data>We are digging test pits for Golder Associates Inc (Rachel Hunt or Ali Dennison @ 425-883-0777) who have the contract with you.</text_data><comment_date>2015-12-02T00:00:00</comment_date></row><row _id="row-xebn-ckqx~s2s4" _uuid="00000000-0000-0000-A0F1-70AE1B09A6ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xebn-ckqx~s2s4"><intent_id>622991</intent_id><project_id>712683</project_id><text_data>Salish Networks, Inc. is a Tribal Government Corporation and is wholly owned by the Tulalip Tribes of Washington, a federally recognized Tribe. The Tulalip Tribes are exempt from State Workers Compensation Insurance Requirements. All workers covered under Tribal First Insurance.Work will be outside, installing and terminating Single-Mode Fiber and associated Termination equipment.</text_data><comment_date>2014-04-02T00:00:00</comment_date></row><row _id="row-qb7k-mj2f-vy7m" _uuid="00000000-0000-0000-4211-F0786A2568F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qb7k-mj2f-vy7m"><intent_id>809713</intent_id><project_id>649039</project_id><text_data>MCI Job # 1678-TBMA Sewer &amp; Storm Restoration</text_data><comment_date>2017-01-04T00:00:00</comment_date></row><row _id="row-4ezc~vi2e-vbgr" _uuid="00000000-0000-0000-5102-9E1EC8341B5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ezc~vi2e-vbgr"><intent_id>1082661</intent_id><project_id>930171</project_id><text_data>WO# N89037</text_data><comment_date>2020-08-24T00:00:00</comment_date></row><row _id="row-bccc.6rgq_fjq5" _uuid="00000000-0000-0000-9859-FBD26AEE26CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bccc.6rgq_fjq5"><intent_id>589602</intent_id><project_id>704635</project_id><text_data>This intent is for the BP 121 portion of Chambers Creek.</text_data><comment_date>2013-08-23T00:00:00</comment_date></row><row _id="row-9y96.b2hp~zb3n" _uuid="00000000-0000-0000-4500-FD88F745C2DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9y96.b2hp~zb3n"><intent_id>1083879</intent_id><project_id>930704</project_id><text_data>WO #385035	$5582.90</text_data><comment_date>2020-08-27T00:00:00</comment_date></row><row _id="row-itgf~jipw-zdza" _uuid="00000000-0000-0000-452D-79F1DCAD59FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-itgf~jipw-zdza"><intent_id>1048528</intent_id><project_id>914181</project_id><text_data>Green Effects will cleanup landscape areas, heavy pruning of trees/shrubs, install plant material, river rock and remove/dispose of all debris. Green Effects will use chainsaws, blowers, pole pruners, power pruners, weedeaters, rake, shovel and wheelbarrow if needed will use mini excavator.</text_data><comment_date>2020-03-30T00:00:00</comment_date></row><row _id="row-q9yz-234u-dhhj" _uuid="00000000-0000-0000-42B2-C91EBB21BF8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9yz-234u-dhhj"><intent_id>812626</intent_id><project_id>811923</project_id><text_data>This is a quarterly waste run</text_data><comment_date>2017-01-25T00:00:00</comment_date></row><row _id="row-n9vm~2w4n.cwty" _uuid="00000000-0000-0000-2850-BCDA42A14295" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n9vm~2w4n.cwty"><intent_id>545810</intent_id><project_id>700232</project_id><text_data>Work will not be completed on any of the Ferry boats but rather at the terminals and ticket kiosks. Breakdown of $7.50 fringe benefits is as follows:Vacation $1.27Holiday $0.64Medical $2.60Social Security $0.84Medicare $0.58L &amp; I $1.57Total: $7.50</text_data><comment_date>2012-12-28T00:00:00</comment_date></row><row _id="row-dd8t_rwp2.z3vw" _uuid="00000000-0000-0000-3872-7F5811C68588" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dd8t_rwp2.z3vw"><intent_id>890549</intent_id><project_id>844776</project_id><text_data>Router replacement. Work performed indoors.</text_data><comment_date>2018-02-28T00:00:00</comment_date></row><row _id="row-2wr8_dyxy-3rpy" _uuid="00000000-0000-0000-887D-52C6F48CFF47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2wr8_dyxy-3rpy"><intent_id>566930</intent_id><project_id>612061</project_id><text_data>Rubenstiens Contract Carpet is filing on behalf of SWS Flooring due to failure to file.</text_data><comment_date>2013-04-29T00:00:00</comment_date></row><row _id="row-stbr_xmuq_uzzs" _uuid="00000000-0000-0000-B747-916C1CD00CDA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-stbr_xmuq_uzzs"><intent_id>798312</intent_id><project_id>805872</project_id><text_data>MMFS Job#73166724</text_data><comment_date>2016-10-27T00:00:00</comment_date></row><row _id="row-tbbh_cxu9-eenh" _uuid="00000000-0000-0000-62E6-29B73D0BF6F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tbbh_cxu9-eenh"><intent_id>570239</intent_id><project_id>711273</project_id><text_data>Filed by: James V BozeProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the listed crafts/trades/occupations.</text_data><comment_date>2013-05-17T00:00:00</comment_date></row><row _id="row-2iam~rdk9~ypm2" _uuid="00000000-0000-0000-597E-C57E87B6AAD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2iam~rdk9~ypm2"><intent_id>695593</intent_id><project_id>762730</project_id><text_data>Several manufactured homes within the Town of Custer		#1 - Install Floor Insulation #2 - Single family manufactured home #3 - 1 level #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2015-05-20T00:00:00</comment_date></row><row _id="row-nyuf_s5kk_6a86" _uuid="00000000-0000-0000-5491-A75A888712B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nyuf_s5kk_6a86"><intent_id>538464</intent_id><project_id>697352</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-11T00:00:00</comment_date></row><row _id="row-dzdy-xrxs_w9tw" _uuid="00000000-0000-0000-FED1-86DA6113A636" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dzdy-xrxs_w9tw"><intent_id>936133</intent_id><project_id>856799</project_id><text_data>Project is renovation of athletic fields.  Our scope of work is to topdress, seed and fertilize using a 45hp John Deere Tractor pulling a spreader and seeder.</text_data><comment_date>2018-09-27T00:00:00</comment_date></row><row _id="row-qvpc_ex4v_6iev" _uuid="00000000-0000-0000-AB17-61E34769033B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qvpc_ex4v_6iev"><intent_id>662084</intent_id><project_id>747341</project_id><text_data>Jennifer Patricelli is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height. The home is not open to the public and does not have a business. The electricians will be installing bathroom and kitchen fans. This job meets the residential job requirements.</text_data><comment_date>2014-10-23T00:00:00</comment_date></row><row _id="row-2tzc-4nih~vcuf" _uuid="00000000-0000-0000-84CA-84956312300D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tzc-4nih~vcuf"><intent_id>1183182</intent_id><project_id>982323</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors</text_data><comment_date>2021-10-05T00:00:00</comment_date></row><row _id="row-a6fa.sqmx.v3fz" _uuid="00000000-0000-0000-D0E3-F02AA597F916" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a6fa.sqmx.v3fz"><intent_id>1023873</intent_id><project_id>890358</project_id><text_data>Maria Vilanueva2251 W Hwy. 26 #48Othello, WA 99344</text_data><comment_date>2019-11-26T00:00:00</comment_date></row><row _id="row-g5qm-uf27.3cqy" _uuid="00000000-0000-0000-2008-5F1A2C00A141" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g5qm-uf27.3cqy"><intent_id>952527</intent_id><project_id>853173</project_id><text_data>Based on The Housing Act of 1937 and 24 CFR 965.101 this project is exempt from the payment of state prevailing wage rates.This project is subject to federal wages only</text_data><comment_date>2019-01-11T00:00:00</comment_date></row><row _id="row-hnr7~aky7~wai2" _uuid="00000000-0000-0000-E5B8-5D48675DC743" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hnr7~aky7~wai2"><intent_id>808069</intent_id><project_id>808618</project_id><text_data>Filed by Kevin P. Achman.This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2016-12-20T00:00:00</comment_date></row><row _id="row-e7av-8h3u.c4jy" _uuid="00000000-0000-0000-CC39-BD7AD01A51BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e7av-8h3u.c4jy"><intent_id>677390</intent_id><project_id>752491</project_id><text_data>A) Renovation B) Demo of existing fixtures &amp; install new plumbingC) Lift, carry &amp; hold building materials, tools &amp; supplies.</text_data><comment_date>2015-02-05T00:00:00</comment_date></row><row _id="row-ruws-buxg_4h6d" _uuid="00000000-0000-0000-F8CE-E1805395AD24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ruws-buxg_4h6d"><intent_id>662831</intent_id><project_id>747650</project_id><text_data>1. to replace windows in mobile home2. single family3. one4. residence a) nob) noc) nod)noe)nof)nog)noh)noi)noi)noJ)nok)no5. yes6. yes7. no8. no</text_data><comment_date>2014-10-28T00:00:00</comment_date></row><row _id="row-re6n~9hik~s87p" _uuid="00000000-0000-0000-2010-868BCE40BD77" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-re6n~9hik~s87p"><intent_id>599970</intent_id><project_id>712235</project_id><text_data>ALL FRINGE BENEFITS SENT TO QUALIFIED PENSION PLAN</text_data><comment_date>2013-10-17T00:00:00</comment_date></row><row _id="row-c4yi.h483.iinh" _uuid="00000000-0000-0000-D66C-DFDB8F00291A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c4yi.h483.iinh"><intent_id>488653</intent_id><project_id>677252</project_id><text_data>Fringe Breakdown: vacation 1.40 holiday .61 health/life 1.92 training .60 pension 11.73</text_data><comment_date>2011-11-10T00:00:00</comment_date></row><row _id="row-467f~kdwb.kfiv" _uuid="00000000-0000-0000-FF50-F72A24B5696E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-467f~kdwb.kfiv"><intent_id>1059102</intent_id><project_id>913407</project_id><text_data>Remove &amp; dispose of asbestos containing built up roofing &amp; floor tile (4 portables), wrap/dispose up to 350 LF 8' waterpipe exposed and removed from ditch by Strickland &amp; Sons</text_data><comment_date>2020-05-19T00:00:00</comment_date></row><row _id="row-u8ry-au3k.d6fy" _uuid="00000000-0000-0000-CA80-776C1DCDF829" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u8ry-au3k.d6fy"><intent_id>994832</intent_id><project_id>879288</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2019-07-25T00:00:00</comment_date></row><row _id="row-x33s-evwa_kv4g" _uuid="00000000-0000-0000-2E58-D6E5CDDA6DD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x33s-evwa_kv4g"><intent_id>1255643</intent_id><project_id>1017767</project_id><text_data>Ther Truck - water truck for dust control, semi-lowboy for equipment mobilization</text_data><comment_date>2022-08-05T00:00:00</comment_date></row><row _id="row-kebf.eb8u~x47n" _uuid="00000000-0000-0000-29F7-89EFC60B4E29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kebf.eb8u~x47n"><intent_id>1231669</intent_id><project_id>1012055</project_id><text_data>#1- heat pump install; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2022-05-06T00:00:00</comment_date></row><row _id="row-e84p_k8jd.f4x7" _uuid="00000000-0000-0000-E715-2FD0238694FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e84p_k8jd.f4x7"><intent_id>489366</intent_id><project_id>678285</project_id><text_data>Hourly benefits:  NEI Welfare Plan $10.525; NEI Pension Plan $6.46; NEI Educational Fund $.55; Work Preservation Fund $.20; Holidays $1.5741; Vacation $4.1989; 401K Annuity $4.25</text_data><comment_date>2011-11-15T00:00:00</comment_date></row><row _id="row-rfx5-5m83.mrxa" _uuid="00000000-0000-0000-C31B-C10CA6FAC73D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rfx5-5m83.mrxa"><intent_id>962675</intent_id><project_id>874368</project_id><text_data>Inv # 22010 - Interwest Construction - ICI - Jobshack TrailerSnohomish County Airport3000 Rockefeller Ave.Everett, WA 98037</text_data><comment_date>2019-02-28T00:00:00</comment_date></row><row _id="row-ubad_8edk-ngbv" _uuid="00000000-0000-0000-F0C3-4D24C665259B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ubad_8edk-ngbv"><intent_id>1100545</intent_id><project_id>935021</project_id><text_data>'TRUCK DRIVER OTHER' USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK</text_data><comment_date>2020-11-02T00:00:00</comment_date></row><row _id="row-cdwf-jbnj~83w5" _uuid="00000000-0000-0000-D153-368786510B27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cdwf-jbnj~83w5"><intent_id>1024507</intent_id><project_id>900849</project_id><text_data>Install electronic control devices on exterior door in baggage claim to be added to  S2 access system.</text_data><comment_date>2019-12-02T00:00:00</comment_date></row><row _id="row-4wn4_frgx_c6ud" _uuid="00000000-0000-0000-3F95-1E1F2F8E2AA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4wn4_frgx_c6ud"><intent_id>1130036</intent_id><project_id>944056</project_id><text_data>Training is complete</text_data><comment_date>2021-04-08T00:00:00</comment_date></row><row _id="row-jgrh_uyay-9ed7" _uuid="00000000-0000-0000-E7D1-9F54B0F3C350" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgrh_uyay-9ed7"><intent_id>1208776</intent_id><project_id>993258</project_id><text_data>Infrastructure data cabling will be installed for network switches and (2) cameras will be installed inside the building.</text_data><comment_date>2022-02-02T00:00:00</comment_date></row><row _id="row-ain4.c3wy~gpp9" _uuid="00000000-0000-0000-9A5C-AC61B5FCF88D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ain4.c3wy~gpp9"><intent_id>1469478</intent_id><project_id>1146527</project_id><text_data>PROPOSAL FS01202, CONTRACT 8/1/23-12/31/24 +, K00489, K00490</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-rmer_nhze-29yd" _uuid="00000000-0000-0000-9180-C9D5FF778A97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rmer_nhze-29yd"><intent_id>885320</intent_id><project_id>842335</project_id><text_data>Install new cabling which can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2018-01-26T00:00:00</comment_date></row><row _id="row-ci7s.z5jv_842t" _uuid="00000000-0000-0000-0332-3E72F1C7C978" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ci7s.z5jv_842t"><intent_id>656126</intent_id><project_id>744985</project_id><text_data>All work performed indoors.</text_data><comment_date>2014-09-22T00:00:00</comment_date></row><row _id="row-6jqh-5gjz.9bxa" _uuid="00000000-0000-0000-259A-B8B24D894008" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6jqh-5gjz.9bxa"><intent_id>543226</intent_id><project_id>691484</project_id><text_data>General Laborer - Sweep gravel on edge of roadway with hand broom.</text_data><comment_date>2012-11-06T00:00:00</comment_date></row><row _id="row-r3p7-5apd-krmf" _uuid="00000000-0000-0000-B3D2-A19B479747F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r3p7-5apd-krmf"><intent_id>932397</intent_id><project_id>861264</project_id><text_data>Install new AC Unit and Air Handler. The structure is a residential duplex structure. Structure is one story.Building is used for residential living. Yes the dwelling has it&amp;#39;s own kitchen and bathroom.</text_data><comment_date>2018-11-02T00:00:00</comment_date></row><row _id="row-jpxc-wvrr.gbxi" _uuid="00000000-0000-0000-3B0B-18FEF12A0E3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jpxc-wvrr.gbxi"><intent_id>1033749</intent_id><project_id>890409</project_id><text_data>Installation of plants, bark, and topsoil.</text_data><comment_date>2020-01-24T00:00:00</comment_date></row><row _id="row-fr39-uzkj-awn4" _uuid="00000000-0000-0000-96A0-34D7D51CBBF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fr39-uzkj-awn4"><intent_id>628673</intent_id><project_id>690663</project_id><text_data>301387</text_data><comment_date>2014-05-08T00:00:00</comment_date></row><row _id="row-455r_6i8z-xpw8" _uuid="00000000-0000-0000-6796-81DF3832813F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-455r_6i8z-xpw8"><intent_id>687095</intent_id><project_id>759106</project_id><text_data>Other truck 4,000 gallon water truck is for compaction and dust control</text_data><comment_date>2015-04-02T00:00:00</comment_date></row><row _id="row-kkj9.kuhk_wdsz" _uuid="00000000-0000-0000-5AE8-505F87C13AA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kkj9.kuhk_wdsz"><intent_id>1082281</intent_id><project_id>929998</project_id><text_data>Replaced Approximately 30 ft Of Rotten 4 in Cast Sewer Line With 4 in ABS.  Replaced Section Of Rotted Out Sink Line With Abs.</text_data><comment_date>2020-08-21T00:00:00</comment_date></row><row _id="row-xvd5-bxec-nqxv" _uuid="00000000-0000-0000-0F6F-63E65CE2D9C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xvd5-bxec-nqxv"><intent_id>682312</intent_id><project_id>755522</project_id><text_data>Fringe Breakdown:$17.88---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $10.88 Pension$10.32---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $3.32 Pension</text_data><comment_date>2015-03-06T00:00:00</comment_date></row><row _id="row-w623-aej3.3khi" _uuid="00000000-0000-0000-D269-564773AFF862" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w623-aej3.3khi"><intent_id>982366</intent_id><project_id>883116</project_id><text_data>Produce precast concrete restroom buildings in our Spokane production facility.</text_data><comment_date>2019-06-05T00:00:00</comment_date></row><row _id="row-efz8_zg3p-4w4f" _uuid="00000000-0000-0000-4476-5EC3734453AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efz8_zg3p-4w4f"><intent_id>1167284</intent_id><project_id>893997</project_id><text_data>Fringe: Vacation $4.64; Holiday Pay $1.91; Health &amp; Welfare $15.88; Pension $10.46; Educational Fund $0.64; Preservation Fund $0.54; Annuity $8.85</text_data><comment_date>2021-08-09T00:00:00</comment_date></row><row _id="row-vs9y_f4mr-d63b" _uuid="00000000-0000-0000-6DB7-1896C913393E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vs9y_f4mr-d63b"><intent_id>1205650</intent_id><project_id>995901</project_id><text_data>09-21-062N</text_data><comment_date>2022-01-19T00:00:00</comment_date></row><row _id="row-mtih-bsyz~dd7v" _uuid="00000000-0000-0000-B166-F831D8AE65EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mtih-bsyz~dd7v"><intent_id>1120169</intent_id><project_id>949351</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc.Install new two way radio communications system. 2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)]No.3. Does this specific project entail the remodeling or new construction of a facility?No.4. If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.Two way radio system. 5. What specific tasks will your employees perform?Motorola will only provide professional services on this project to include engineering and project management.  6. What, if any, tools will your employees use in the performance of those tasks?No tools are required by Motorola on this project.  7. If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No.8. Are you going to be hiring any subcontractors for this project?Yes.9. When is your work to be completed? Planning or preconstruction phase or during the public works project?Project completion is 31 December 2021</text_data><comment_date>2021-02-23T00:00:00</comment_date></row><row _id="row-d299.r9f3~7gct" _uuid="00000000-0000-0000-443E-4511D1C98F8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d299.r9f3~7gct"><intent_id>1197701</intent_id><project_id>990681</project_id><comment_date>2021-12-07T00:00:00</comment_date></row><row _id="row-ja7j-ixqa~zi4z" _uuid="00000000-0000-0000-997A-3F805055DA12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ja7j-ixqa~zi4z"><intent_id>512075</intent_id><project_id>675564</project_id><text_data>Form filed by: William Foran</text_data><comment_date>2012-05-15T00:00:00</comment_date></row><row _id="row-iqje-4i7i_3b8q" _uuid="00000000-0000-0000-944F-3B95EB127E52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iqje-4i7i_3b8q"><intent_id>617202</intent_id><project_id>697753</project_id><text_data>Owner Operated. WO#15</text_data><comment_date>2014-02-20T00:00:00</comment_date></row><row _id="row-wrsr.hjd6~fhtw" _uuid="00000000-0000-0000-01A1-DB4427FA9F76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wrsr.hjd6~fhtw"><intent_id>1104987</intent_id><project_id>940501</project_id><text_data>F1005 YOUTHCARE SOUTH SEATTLE</text_data><comment_date>2020-11-20T00:00:00</comment_date></row><row _id="row-n6mi-v2ky~3u3g" _uuid="00000000-0000-0000-108B-3CC45BE6DB41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n6mi-v2ky~3u3g"><intent_id>1077475</intent_id><project_id>927831</project_id><text_data>extra inv 5001289828eve</text_data><comment_date>2020-08-04T00:00:00</comment_date></row><row _id="row-2p2r~99fu-6xvi" _uuid="00000000-0000-0000-8A0C-C1B91D8E072B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2p2r~99fu-6xvi"><intent_id>494219</intent_id><project_id>672350</project_id><text_data>This start date is accurate.</text_data><comment_date>2012-01-24T00:00:00</comment_date></row><row _id="row-jn45~tnm8_qe76" _uuid="00000000-0000-0000-298B-F9A4760F4B4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jn45~tnm8_qe76"><intent_id>758358</intent_id><project_id>787730</project_id><text_data>1 drain cleaning 2 single 3 n/a 4a no b no c no d no e no f no g no h no i no j no 5 yes6 yes 7 no 8 no</text_data><comment_date>2016-04-25T00:00:00</comment_date></row><row _id="row-t9bq-saz5.i2c6" _uuid="00000000-0000-0000-2C26-5328E4449C49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9bq-saz5.i2c6"><intent_id>1261728</intent_id><project_id>984442</project_id><text_data>semi trucks hauling demo concrete slabs</text_data><comment_date>2022-08-26T00:00:00</comment_date></row><row _id="row-iguj.wwfk_yu9c" _uuid="00000000-0000-0000-220B-39EF032B9767" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iguj.wwfk_yu9c"><intent_id>1215706</intent_id><project_id>1002235</project_id><text_data>64949-1</text_data><comment_date>2022-03-04T00:00:00</comment_date></row><row _id="row-reuv_tfc6-uaag" _uuid="00000000-0000-0000-CD6F-C3E89B919629" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-reuv_tfc6-uaag"><intent_id>736479</intent_id><project_id>780226</project_id><text_data>Estimated amount is a maximum per window</text_data><comment_date>2015-12-07T00:00:00</comment_date></row><row _id="row-yn94-tuxv-nbmc" _uuid="00000000-0000-0000-B6E9-0380139E51E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yn94-tuxv-nbmc"><intent_id>1107067</intent_id><project_id>932879</project_id><text_data>Job 20-028</text_data><comment_date>2020-12-02T00:00:00</comment_date></row><row _id="row-eg3g_sma9.3qfa" _uuid="00000000-0000-0000-3403-44C3D14E6F10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eg3g_sma9.3qfa"><intent_id>847650</intent_id><project_id>822859</project_id><text_data>The work includes fish capture and relocation from stream sections isolated for construction.  The work will be performed by a certified fisheries professional and staff biologists.</text_data><comment_date>2017-07-14T00:00:00</comment_date></row><row _id="row-p8dk_32bu-i7bc" _uuid="00000000-0000-0000-83E8-5B9438631274" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p8dk_32bu-i7bc"><intent_id>940665</intent_id><project_id>859709</project_id><text_data>0818109</text_data><comment_date>2018-10-18T00:00:00</comment_date></row><row _id="row-yigt.egzh_zejp" _uuid="00000000-0000-0000-59D1-EF355A4DAA3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yigt.egzh_zejp"><intent_id>1057798</intent_id><project_id>745915</project_id><text_data>4823-0513106</text_data><comment_date>2020-05-13T00:00:00</comment_date></row><row _id="row-32uc~sr6j-fv3m" _uuid="00000000-0000-0000-8B7B-7B0F2D42EC1B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-32uc~sr6j-fv3m"><intent_id>1274895</intent_id><project_id>1035469</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. BCI Project PE2031Filed by Kathi Clark</text_data><comment_date>2022-10-14T00:00:00</comment_date></row><row _id="row-js98~kdx3_ykm5" _uuid="00000000-0000-0000-B358-CFBA8346C69C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-js98~kdx3_ykm5"><intent_id>1179637</intent_id><project_id>978412</project_id><text_data>made corrections to fringe and wage amounts</text_data><comment_date>2021-09-27T00:00:00</comment_date></row><row _id="row-2wk9.uwaa-imbm" _uuid="00000000-0000-0000-7E5B-A7128B39C088" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2wk9.uwaa-imbm"><intent_id>1095681</intent_id><project_id>936187</project_id><text_data>Ran the data cable for the Crisis Stabilization building</text_data><comment_date>2020-10-13T00:00:00</comment_date></row><row _id="row-zepb.ejnf~g82b" _uuid="00000000-0000-0000-D4B6-803CFB98E71E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zepb.ejnf~g82b"><intent_id>611389</intent_id><project_id>724605</project_id><text_data>Filed by Ron Walden.</text_data><comment_date>2014-01-09T00:00:00</comment_date></row><row _id="row-3cjt.mbv8_93as" _uuid="00000000-0000-0000-9C72-5A0A7DE95848" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3cjt.mbv8_93as"><intent_id>979370</intent_id><project_id>874066</project_id><text_data>We will be installing seeding fertilizer and mulch, installing sod, installing rock mulch and installing irrigation PVC pipe sleeve.  We will also do any necessary landscape restoration using hand tools such as shovels, rakes, pipe cutters etc.  Equipment will be under 90 HP - mini skit steers or mini excavator.</text_data><comment_date>2019-05-21T00:00:00</comment_date></row><row _id="row-qcqd~jwst~8r96" _uuid="00000000-0000-0000-8EFC-60E927499085" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qcqd~jwst~8r96"><intent_id>656952</intent_id><project_id>740686</project_id><text_data>Install CAT6 cabling in two new dual portables.  Work will be on the telecommunication system to provide internet and Wi-Fi access to the classrooms.  All work will be performed indoors.</text_data><comment_date>2014-09-25T00:00:00</comment_date></row><row _id="row-zuq8~b666-wk56" _uuid="00000000-0000-0000-42A4-6957BA921DE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zuq8~b666-wk56"><intent_id>959931</intent_id><project_id>873017</project_id><text_data>Other Truck - Lowboy DriverOther Truck - Sweeper</text_data><comment_date>2019-02-12T00:00:00</comment_date></row><row _id="row-mrxu_h5ci.a55a" _uuid="00000000-0000-0000-394C-7E2D4FE57F25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrxu_h5ci.a55a"><intent_id>1224982</intent_id><project_id>1008159</project_id><text_data>Run two telephone wires from IDF to closet in Linkletter HallAll work to be done within the existing building</text_data><comment_date>2022-04-12T00:00:00</comment_date></row><row _id="row-mdvs.yc29_e75u" _uuid="00000000-0000-0000-C518-C681E168691C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mdvs.yc29_e75u"><intent_id>663829</intent_id><project_id>748067</project_id><text_data>Form filed by: Kathy Remick</text_data><comment_date>2014-11-04T00:00:00</comment_date></row><row _id="row-64ny-8cr2.uvgv" _uuid="00000000-0000-0000-9A4F-8082441210B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-64ny-8cr2.uvgv"><intent_id>929426</intent_id><project_id>860115</project_id><text_data>The $7,000.00 is an estimate including $492.48 per month from Oct 18-June 19 plus supplies and floor cleaning as needed.</text_data><comment_date>2018-08-29T00:00:00</comment_date></row><row _id="row-38sc-p3qx~9e6w" _uuid="00000000-0000-0000-B74E-376D2BD2CE25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-38sc-p3qx~9e6w"><intent_id>752006</intent_id><project_id>787491</project_id><text_data>sand  the plaster with diamond grinder, jack hammer the local spot, repack with cement, then add plaster to the spot.</text_data><comment_date>2016-03-17T00:00:00</comment_date></row><row _id="row-xiwj-hw8h_hcbi" _uuid="00000000-0000-0000-978F-988A9A5A4A84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xiwj-hw8h_hcbi"><intent_id>782827</intent_id><project_id>799954</project_id><text_data>We received a Small Public Works Contract that will not exceed $30,000.00 per 12-month period.  No contract number was issued.</text_data><comment_date>2016-08-17T00:00:00</comment_date></row><row _id="row-rebc_qvpa-ah3x" _uuid="00000000-0000-0000-4A81-8DF6422D6FF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rebc_qvpa-ah3x"><intent_id>789682</intent_id><project_id>799590</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2016-09-15T00:00:00</comment_date></row><row _id="row-m8qu~dmak~287s" _uuid="00000000-0000-0000-FCEE-54AA24B35EE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8qu~dmak~287s"><intent_id>512862</intent_id><project_id>688000</project_id><text_data>HIF# 12513040</text_data><comment_date>2012-05-21T00:00:00</comment_date></row><row _id="row-4cpx_6zwu~7upi" _uuid="00000000-0000-0000-20EB-42C67CA02BA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4cpx_6zwu~7upi"><intent_id>508641</intent_id><project_id>686325</project_id><text_data>HIF #'s; 12381859, 12397573, 12397698, 12413624, 12429876, 12429932, 12489381, 12451286, 12467675, 12512820, 12501422, 12526050, 12533228, 12533392, 12533583, 12544886, 12557548, 12572313, 12576676, 12440120, 12599833, 12599948, 12617840, 12617946.</text_data><comment_date>2012-04-20T00:00:00</comment_date></row><row _id="row-7zcq.fgng~gpwg" _uuid="00000000-0000-0000-081A-3140F9610728" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zcq.fgng~gpwg"><intent_id>826255</intent_id><project_id>802580</project_id><text_data>Other trucks are low boys for hauling equipment</text_data><comment_date>2017-04-12T00:00:00</comment_date></row><row _id="row-w9gu~4m8n_9gu9" _uuid="00000000-0000-0000-28F3-74C29D5042FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9gu~4m8n_9gu9"><intent_id>875622</intent_id><project_id>830731</project_id><text_data>General laborers: hand shovelOther trucks: Lowboy &amp; Water truck</text_data><comment_date>2017-11-17T00:00:00</comment_date></row><row _id="row-nq9f.s8cp_gapp" _uuid="00000000-0000-0000-B388-775F8877D48A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nq9f.s8cp_gapp"><intent_id>1088509</intent_id><project_id>874922</project_id><text_data>ELEVATOR MODERNIZATION PROJECT</text_data><comment_date>2020-09-16T00:00:00</comment_date></row><row _id="row-w9xy_u4uk~ntv7" _uuid="00000000-0000-0000-FDED-EE9A4FA14742" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9xy_u4uk~ntv7"><intent_id>1022845</intent_id><project_id>885748</project_id><text_data>low voltage cabling</text_data><comment_date>2019-11-20T00:00:00</comment_date></row><row _id="row-rkw6_g2bw~yi3r" _uuid="00000000-0000-0000-F0AC-3A96991F7AF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rkw6_g2bw~yi3r"><intent_id>625668</intent_id><project_id>733298</project_id><text_data>cabled plugged lines of Grease Trap</text_data><comment_date>2014-04-18T00:00:00</comment_date></row><row _id="row-f2hn.vzfy_w5ku" _uuid="00000000-0000-0000-A84B-4E718F88B82D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f2hn.vzfy_w5ku"><intent_id>519142</intent_id><project_id>690496</project_id><text_data>Form filed by: Lynn StephensProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 254 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations1. 618 S. Prospect2. 635 S. Fife3. 3413 S. 12th St.4. 3417 S. 12th St.5. 3008 S 13th St.6. 1020 Norpoint Way NE7. 1605 E. 59th St.8. 120 E. Bismark9. 6413 S. Pine10. 5910 S. Cheyenne</text_data><comment_date>2012-06-27T00:00:00</comment_date></row><row _id="row-y7y4~ra73_j7t8" _uuid="00000000-0000-0000-C9F1-85F81DC7DD33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y7y4~ra73_j7t8"><intent_id>971835</intent_id><project_id>873870</project_id><text_data>Install furnace</text_data><comment_date>2019-04-16T00:00:00</comment_date></row><row _id="row-uedx_4te6_3fb5" _uuid="00000000-0000-0000-FDEF-FD2FA935EEC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uedx_4te6_3fb5"><intent_id>753883</intent_id><project_id>786214</project_id><text_data>#4c yes</text_data><comment_date>2016-06-13T00:00:00</comment_date></row><row _id="row-af2n.ddcp_fby2" _uuid="00000000-0000-0000-1D0E-E76C9C99627A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-af2n.ddcp_fby2"><intent_id>1318030</intent_id><project_id>1062397</project_id><text_data>9902305</text_data><comment_date>2023-04-08T00:00:00</comment_date></row><row _id="row-srdp-6nrk-t8tg" _uuid="00000000-0000-0000-5647-888CA8C01132" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-srdp-6nrk-t8tg"><intent_id>1090948</intent_id><project_id>933935</project_id><text_data>Dispatched to water cleanup on 7/22/20 that occurred on the 2nd floor from a hot water tank leak. Arrived onsite and assessed the situation. Set up 10 dehumidifiers, 40 air movers , 2 inject-i-dry and 1 spider box. Sprayed antimicrobial and monitored moisture levels. Tools used: hammer, pry bar, containment, debris bags and moisture meter.</text_data><comment_date>2020-09-24T00:00:00</comment_date></row><row _id="row-wvn5~b5wx-4aaa" _uuid="00000000-0000-0000-A156-FE57D420EF5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wvn5~b5wx-4aaa"><intent_id>615645</intent_id><project_id>727605</project_id><text_data>Owner/Operator Dump Truck Services. SCI Job # 1401 Beachwood Elementary Replacement</text_data><comment_date>2014-02-10T00:00:00</comment_date></row><row _id="row-wksa~9rxy~w25e" _uuid="00000000-0000-0000-41B2-B8B5735DA427" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wksa~9rxy~w25e"><intent_id>1027437</intent_id><project_id>902301</project_id><text_data>Provide and installed two side mount  motors and removal of old cylinders and drive chains using a scissor lift, impact hammer, roto hammer &amp; drill.</text_data><comment_date>2020-01-23T00:00:00</comment_date></row><row _id="row-stdg~4bmn~ctbh" _uuid="00000000-0000-0000-8DAD-28EDE9BE8EF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-stdg~4bmn~ctbh"><intent_id>742391</intent_id><project_id>760312</project_id><text_data>#1)Install Heating &amp; Cooling systems in a 4-Plex.#2)Structure is a 4-Plex.#3)1 Level/story.#4)(a)no, (b)no, (c)yes, (d)</text_data><comment_date>2016-01-20T00:00:00</comment_date></row><row _id="row-i79t-4txe-k5ts" _uuid="00000000-0000-0000-A66B-35C15DE24D7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i79t-4txe-k5ts"><intent_id>658291</intent_id><project_id>718626</project_id><text_data>modify existing irrigation system and install new irrigation system as required. Place topsoil, plant trees &amp; shrubs, place bark mulch, fine grade, seed and sod</text_data><comment_date>2014-10-02T00:00:00</comment_date></row><row _id="row-mvpk_mtx5~q9xj" _uuid="00000000-0000-0000-1BE7-174BCA7FE335" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mvpk_mtx5~q9xj"><intent_id>629219</intent_id><project_id>672028</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2014-05-12T00:00:00</comment_date></row><row _id="row-gcyk~7876~wc5h" _uuid="00000000-0000-0000-9D6E-DDC61D670730" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcyk~7876~wc5h"><intent_id>917162</intent_id><project_id>848693</project_id><text_data>0</text_data><comment_date>2018-07-11T00:00:00</comment_date></row><row _id="row-2qv3_5i5d~sgei" _uuid="00000000-0000-0000-BA52-A476E8FA540E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2qv3_5i5d~sgei"><intent_id>763643</intent_id><project_id>767280</project_id><text_data>302010</text_data><comment_date>2016-05-23T00:00:00</comment_date></row><row _id="row-tb3k-7fq6~wpzd" _uuid="00000000-0000-0000-09B4-E365755A5966" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tb3k-7fq6~wpzd"><intent_id>1019458</intent_id><project_id>898522</project_id><text_data>#1-Install Ductless Heat Pump; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2019-11-04T00:00:00</comment_date></row><row _id="row-9ktt_yrdi.2tsi" _uuid="00000000-0000-0000-F8C4-420652DE4B2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ktt_yrdi.2tsi"><intent_id>630172</intent_id><project_id>735165</project_id><text_data>Laborer-Welder will be welding angle iron brackets onto steel sheet pile using a Miller 225G Portable Welder &amp; a Victor Torch Set.  Truck Driver/Other Truck will be a 3,000 gallon water truck.</text_data><comment_date>2014-05-21T00:00:00</comment_date></row><row _id="row-e3aj~t62r_zkn3" _uuid="00000000-0000-0000-0938-B37FCB699E05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e3aj~t62r_zkn3"><intent_id>560006</intent_id><project_id>706767</project_id><text_data>SE 184th Lane, Renton</text_data><comment_date>2013-03-14T00:00:00</comment_date></row><row _id="row-c6ad-u95m_2d92" _uuid="00000000-0000-0000-6975-033A5AA82021" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6ad-u95m_2d92"><intent_id>835526</intent_id><project_id>822363</project_id><text_data>Install 7 Cat6 plenum cables for phone and data from the Telecom room to the front office, cafeteria and lobby. On one end technician will terminate onto a patch panel in the telecom closet. On the other end will terminate onto a jack, label and test.</text_data><comment_date>2017-05-22T00:00:00</comment_date></row><row _id="row-yfz6~ne6a-c4zf" _uuid="00000000-0000-0000-394B-DE5F8C5358E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yfz6~ne6a-c4zf"><intent_id>831072</intent_id><project_id>819948</project_id><text_data>The general laborer uncrates and sets in place � no hook ups � commercial kitchen equipment.</text_data><comment_date>2017-05-08T00:00:00</comment_date></row><row _id="row-nzkb_zun6-7tni" _uuid="00000000-0000-0000-D77F-FDBC09DCFE70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nzkb_zun6-7tni"><intent_id>1276149</intent_id><project_id>1036162</project_id><text_data>9899858</text_data><comment_date>2022-10-19T00:00:00</comment_date></row><row _id="row-mpzb-3iw6-dang" _uuid="00000000-0000-0000-6B30-385F440016C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpzb-3iw6-dang"><intent_id>763182</intent_id><project_id>791673</project_id><text_data>1116054</text_data><comment_date>2016-05-19T00:00:00</comment_date></row><row _id="row-cbpy-7gu7.4phd" _uuid="00000000-0000-0000-F6B1-D3291CDF109A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cbpy-7gu7.4phd"><intent_id>1149902</intent_id><project_id>965238</project_id><text_data>9863171</text_data><comment_date>2021-06-04T00:00:00</comment_date></row><row _id="row-k7i8-tkke.ykbp" _uuid="00000000-0000-0000-6914-8B413CB9DF63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7i8-tkke.ykbp"><intent_id>512901</intent_id><project_id>688014</project_id><text_data>This project consists of cleanup of the landscape at Casino road building  and Kashe Park Base to include weedeating,raking and spraying of the weeds in that planting bed, and installing erosion control rocks in the swale. Equipment to be used will be weed eaters, hula hoes, rakes, buckets, backpack sprayer, wheelbarrows, shovels and a backpack blower for the purpose of clean from the work.</text_data><comment_date>2012-05-21T00:00:00</comment_date></row><row _id="row-t8mp_yzwb-krxm" _uuid="00000000-0000-0000-C5E2-AB4488EDFD88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t8mp_yzwb-krxm"><intent_id>1032378</intent_id><project_id>881364</project_id><text_data>INSTALLATION OF TREES SHRUBS AND GROUNDCOVER. INSTALLATION OF ROOT BARRIER FOR TREES. PLACING TOPSOIL.  WOOD CHIP MULCH FOR BEAUTIFICATION . INSTALLATION OF IRRIGATION SYSTEM. ALL WORK TO BE COMPLETE ON 1ST ST, FROM ALDER TO STATE AVE.</text_data><comment_date>2020-01-17T00:00:00</comment_date></row><row _id="row-gk93-esre-xrf8" _uuid="00000000-0000-0000-0F88-50E17EDA365D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gk93-esre-xrf8"><intent_id>967573</intent_id><project_id>876664</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2019-03-26T00:00:00</comment_date></row><row _id="row-uz63_kxy8-298z" _uuid="00000000-0000-0000-8EBA-46F5EF0F61E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uz63_kxy8-298z"><intent_id>492699</intent_id><project_id>675987</project_id><text_data>Glass &amp; GlazingOwner/Operator</text_data><comment_date>2011-12-08T00:00:00</comment_date></row><row _id="row-77j3~2wia.nsu2" _uuid="00000000-0000-0000-A146-9C454BAD72F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-77j3~2wia.nsu2"><intent_id>791607</intent_id><project_id>803334</project_id><text_data>Filed by Jackie Taylor</text_data><comment_date>2016-09-23T00:00:00</comment_date></row><row _id="row-5838-xpwy~pshv" _uuid="00000000-0000-0000-9187-A9BC03295704" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5838-xpwy~pshv"><intent_id>955129</intent_id><project_id>870758</project_id><text_data>WO #9527962</text_data><comment_date>2019-01-15T00:00:00</comment_date></row><row _id="row-swtb_ndpz-dczu" _uuid="00000000-0000-0000-25A2-DED645EB1F6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-swtb_ndpz-dczu"><intent_id>933708</intent_id><project_id>861759</project_id><text_data>Installation of new wall mount IDF cabinet and relocate 16 existing network cables from old IDF to new IDF.  This cabinet and these cables provide telephone (voice over distance) and/or data (bits and bytes) data connection within the telecommunications system.  All work to be performed indoors.</text_data><comment_date>2018-09-18T00:00:00</comment_date></row><row _id="row-pkr8.jpiq.s6uv" _uuid="00000000-0000-0000-FE52-E9D31252D93B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pkr8.jpiq.s6uv"><intent_id>1094549</intent_id><project_id>860697</project_id><text_data>JCFP has Industrial Insurance</text_data><comment_date>2020-10-08T00:00:00</comment_date></row><row _id="row-kykm-ptyc.iwj5" _uuid="00000000-0000-0000-D341-86BE3B51CC18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kykm-ptyc.iwj5"><intent_id>1057051</intent_id><project_id>903737</project_id><text_data>303244</text_data><comment_date>2020-05-11T00:00:00</comment_date></row><row _id="row-nvmx.u4up~knuq" _uuid="00000000-0000-0000-753D-C6162EB2482E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nvmx.u4up~knuq"><intent_id>697498</intent_id><project_id>763541</project_id><text_data>Clean fumehood and fan as directedHazwaste workers to clean area using rags and sponges, and/or misc hand tools</text_data><comment_date>2015-06-01T00:00:00</comment_date></row><row _id="row-hfsy~qe8a.vfy4" _uuid="00000000-0000-0000-0185-68D7F0B9F8CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hfsy~qe8a.vfy4"><intent_id>470905</intent_id><project_id>663072</project_id><text_data>General Laborer - jobsite cleanup, raising utilities, patchingEquipment - coring machine, shovel, hand tampVehicle - Pickup</text_data><comment_date>2011-08-23T00:00:00</comment_date></row><row _id="row-magb~yyca~hhxk" _uuid="00000000-0000-0000-C219-412FE00CF8C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-magb~yyca~hhxk"><intent_id>991880</intent_id><project_id>883948</project_id><text_data>FILED BY RANDY ROODENDAAL</text_data><comment_date>2019-07-15T00:00:00</comment_date></row><row _id="row-7bqt_j93x~fkp6" _uuid="00000000-0000-0000-86C3-255DE767841C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7bqt_j93x~fkp6"><intent_id>801846</intent_id><project_id>801714</project_id><text_data>Filed by Marcie JarvisThis project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2016-11-16T00:00:00</comment_date></row><row _id="row-67p3_kark~b4k8" _uuid="00000000-0000-0000-5F56-A1A168D427C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-67p3_kark~b4k8"><intent_id>1169237</intent_id><project_id>975171</project_id><text_data>1.     Wx work residence a.n b. n c. y d.n e. n f. n g. n h. n i. n j. n k. n l. n 5. y 6. y 7. n 8 n</text_data><comment_date>2021-08-16T00:00:00</comment_date></row><row _id="row-w7mh_du6a-vf75" _uuid="00000000-0000-0000-2367-0FF86697FD34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w7mh_du6a-vf75"><intent_id>1286358</intent_id><project_id>1042563</project_id><text_data>cut up 3 fallen trees</text_data><comment_date>2022-11-29T00:00:00</comment_date></row><row _id="row-e73v-3z2p_iyzn" _uuid="00000000-0000-0000-AD32-489CCEB5744E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e73v-3z2p_iyzn"><intent_id>1318031</intent_id><project_id>1062398</project_id><text_data>9898581</text_data><comment_date>2023-04-08T00:00:00</comment_date></row><row _id="row-k4pj.i323.e3v5" _uuid="00000000-0000-0000-63A2-B8382FD85CB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k4pj.i323.e3v5"><intent_id>1318029</intent_id><project_id>1062396</project_id><text_data>9914964</text_data><comment_date>2023-04-08T00:00:00</comment_date></row><row _id="row-sj65_wqas_xinv" _uuid="00000000-0000-0000-81FC-B2512E873D0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sj65_wqas_xinv"><intent_id>1318038</intent_id><project_id>1062403</project_id><text_data>9915821</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-fp35-gdx5-cyey" _uuid="00000000-0000-0000-CE82-DDA34CADC6B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fp35-gdx5-cyey"><intent_id>733630</intent_id><project_id>774194</project_id><text_data>Filed by Lucas OberhanslyProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24CFR 965 101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-s5py~2d6n-dbst" _uuid="00000000-0000-0000-2D23-AFB77A1028E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s5py~2d6n-dbst"><intent_id>641523</intent_id><project_id>735953</project_id><text_data>Taylor Transport Inc. 401k Pension plan is 100% immediately vested and paid weekly</text_data><comment_date>2014-07-16T00:00:00</comment_date></row><row _id="row-ad3b.g4pz~536g" _uuid="00000000-0000-0000-4979-E0392EFFE840" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ad3b.g4pz~536g"><intent_id>821364</intent_id><project_id>815901</project_id><text_data>Job #110148-001</text_data><comment_date>2017-03-17T00:00:00</comment_date></row><row _id="row-adx2.cwed~sc29" _uuid="00000000-0000-0000-B510-B59CA6659613" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-adx2.cwed~sc29"><intent_id>769988</intent_id><project_id>795101</project_id><text_data>WORK PERFORMED BY THE TELECOMMUNICATION TECHNICIANS IS INSTALLING TELECOMMUNICATIONS CABLING CATEGORY 6 FOR VOICE (TELEPHONE) AND DATA (COMPUTER NETWORKING) INDOORS AT SAMARITAN HOSPITAL FOR THE INFANT SECURITY SYSTEM-CABLING ONLY.</text_data><comment_date>2016-07-05T00:00:00</comment_date></row><row _id="row-g8it~73rk~gsfb" _uuid="00000000-0000-0000-D5A5-D3B87AE3A4AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8it~73rk~gsfb"><intent_id>561443</intent_id><project_id>707420</project_id><text_data>These various Pierce County multi family homes with a total of 8 units. Each home has a kitchen and at least one bathroom and is considered a permanent residence for all its tenants. These buildings are no more than two srories in height. The electricians will be replacing fans. This job meets the residential job requirements.</text_data><comment_date>2013-03-25T00:00:00</comment_date></row><row _id="row-6sfd_ydys_4732" _uuid="00000000-0000-0000-F11E-26156526091F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6sfd_ydys_4732"><intent_id>907140</intent_id><project_id>850220</project_id><text_data>Hauling for Hire</text_data><comment_date>2018-05-25T00:00:00</comment_date></row><row _id="row-uffz-n5sp.4k4a" _uuid="00000000-0000-0000-782A-8EDBE1F99354" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uffz-n5sp.4k4a"><intent_id>611598</intent_id><project_id>727163</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. INSULATION #2 - Is the structure a single family dwelling YES, duplex, apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories?NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other?  NO#5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NOMARIA PARRA-BOXLEY20 E FIR CTSHELTON 98584</text_data><comment_date>2014-01-10T00:00:00</comment_date></row><row _id="row-w2hc-ntmp~bhc4" _uuid="00000000-0000-0000-BA28-052B30A40F84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w2hc-ntmp~bhc4"><intent_id>911337</intent_id><project_id>853430</project_id><text_data>Remove contaminated soilsHaz Waste workers to clear area of all debris using rakes/shovelsMotor Patrol Grader to vacuum area of all contaminated soils</text_data><comment_date>2018-06-14T00:00:00</comment_date></row><row _id="row-xc27_mtdg_n5az" _uuid="00000000-0000-0000-28E9-6C66FDD8AA2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xc27_mtdg_n5az"><intent_id>817922</intent_id><project_id>814336</project_id><text_data>Job #110482-001</text_data><comment_date>2017-02-27T00:00:00</comment_date></row><row _id="row-cwi3-ya8s-cxxu" _uuid="00000000-0000-0000-7444-A3B3409D3F8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cwi3-ya8s-cxxu"><intent_id>1103046</intent_id><project_id>939783</project_id><text_data>Service repair on furnace for homeowner in a single family 1 story manufactured home, - 4a) NO 4b) NO 4c) YES 4d) NO 4e) NO 4f) NO 4g) NO 4h) NO 4i) NO 4j) NO 4k) NO 5) NO 6) NO 7) NO 8) NO</text_data><comment_date>2020-11-12T00:00:00</comment_date></row><row _id="row-ygvf_g57j.ta72" _uuid="00000000-0000-0000-911B-0DDAD6B2BE5B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ygvf_g57j.ta72"><intent_id>1044834</intent_id><project_id>884577</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc.To clean/treat fungal impacted wood framing and plywood that was exposed to water during frequent rain events throughout the construction period at the school.2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. (See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3))No3. Does this project entail the remodeling or new construction of a facility?No 4. If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.  No5. What specific tasks will your employees perform?  PBS will be providing oversight of fungal activities to be performed by a subcontractor to be sure they are done in accordance with EPA guidance.6. What, if any, tools will your employees use in the performance of those tasks?  None.7. If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?None. 8. Are you going to be hiring any subcontractors for this project?  Yes.9. When is your work to be completed? Planning or preconstruction phase or during the public works project?During the public works project.</text_data><comment_date>2020-03-11T00:00:00</comment_date></row><row _id="row-rfdx-mb79_aeb7" _uuid="00000000-0000-0000-A1C9-0F5A4B0A1059" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rfdx-mb79_aeb7"><intent_id>800515</intent_id><project_id>806051</project_id><text_data>The duties to be performed by the General Laborer are: demolition of walls, casework, ceiling, and flooring. The tools to be used by the General Laborer are: Sledge hammer, pry bar, sawzall, hammers, gloves, shovels, brooms, dust pans, hand cart.</text_data><comment_date>2016-11-09T00:00:00</comment_date></row><row _id="row-fx5d_pkz3_7q43" _uuid="00000000-0000-0000-0601-368E57D748C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fx5d_pkz3_7q43"><intent_id>654096</intent_id><project_id>674123</project_id><text_data>Form filed by: Valentina Estrada</text_data><comment_date>2014-09-12T00:00:00</comment_date></row><row _id="row-neq8.c7te-s63k" _uuid="00000000-0000-0000-3FB0-EF90922CBF9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-neq8.c7te-s63k"><intent_id>1073752</intent_id><project_id>926162</project_id><text_data>Blythe Job X-226 (initial work order 92613^)</text_data><comment_date>2020-07-21T00:00:00</comment_date></row><row _id="row-h45x-qknr.7bdp" _uuid="00000000-0000-0000-292C-71767114BCEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h45x-qknr.7bdp"><intent_id>783158</intent_id><project_id>788355</project_id><text_data>We will be doing tree climbing and stump grinding.depending on what the contractor at the time requires</text_data><comment_date>2016-08-26T00:00:00</comment_date></row><row _id="row-x4qz~yx3f_z3q5" _uuid="00000000-0000-0000-702C-10F4AC1249E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x4qz~yx3f_z3q5"><intent_id>1019569</intent_id><project_id>889718</project_id><text_data>Job 2019-014</text_data><comment_date>2019-11-04T00:00:00</comment_date></row><row _id="row-2zr5.3574_6ecr" _uuid="00000000-0000-0000-24F3-FD5748806EED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2zr5.3574_6ecr"><intent_id>689369</intent_id><project_id>754387</project_id><text_data>Hydroseeding.  Hydroseeder, hand tools</text_data><comment_date>2015-04-16T00:00:00</comment_date></row><row _id="row-2mvn-umva_nbr6" _uuid="00000000-0000-0000-0EC2-49877145BE7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2mvn-umva_nbr6"><intent_id>726506</intent_id><project_id>770950</project_id><text_data>INTENT VERBAGE1. TRUCK DRIVER - DRIVING TRUCK MOUNTED HYDROSEEDER AND SKID STEER2. NOZZELMAN - SPRAYING HYDROMULCHING AND OPERATING SKID STEER3. LANDSCAPE LABORER - LOADING SEED, FERTILIZER, MULCH INTO MACHINE BE HAND AND CLEANINGNOTE: ALL FRINGE IS PAID TO DAVIS BACONVESTING:Prevailing wage contribution. If the work you perform for the Employer is subject to prevailing wage laws, then the Employer will make contributions to this Plan to help satisfy the fringe benefit requirements of the law. You will receive this contribution based on work you perform during a Plan Year that is subject to the law. The contribution is 100% vested PARTICIPATION:If you are working under a prevailing wage contract, then for purposes of receiving any prevailing wage contribution made to the Plan, you are eligible to participate on the date your employment is covered under the contract and will enter the Plan on that date, unless the prevailing wage contract provides otherwise.</text_data><comment_date>2015-10-15T00:00:00</comment_date></row><row _id="row-e355.73p4~navt" _uuid="00000000-0000-0000-29A0-DC1976A3C7CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e355.73p4~navt"><intent_id>792152</intent_id><project_id>803544</project_id><text_data>WO #8016779</text_data><comment_date>2016-09-27T00:00:00</comment_date></row><row _id="row-prft.jaia.spgj" _uuid="00000000-0000-0000-5B22-6F62644D4C2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prft.jaia.spgj"><intent_id>822404</intent_id><project_id>816356</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2017-03-23T00:00:00</comment_date></row><row _id="row-s87m~f8u8~55zg" _uuid="00000000-0000-0000-9E42-19695D029455" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s87m~f8u8~55zg"><intent_id>845202</intent_id><project_id>826237</project_id><text_data>1)We were contracted to repair the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-07-05T00:00:00</comment_date></row><row _id="row-sdkw.k28i~kxxg" _uuid="00000000-0000-0000-21C6-5509E449F003" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sdkw.k28i~kxxg"><intent_id>1035665</intent_id><project_id>906833</project_id><text_data>1  Weatherize Home  2.  Single Family  3.  1 or 2  4.  a. no  b. no  c.  yes  d. no  e. no  f. no  g. no  h. no  I  no  j. no  k. yes  6. yes  7. no  8. no</text_data><comment_date>2020-02-03T00:00:00</comment_date></row><row _id="row-zw66-wib5_n2in" _uuid="00000000-0000-0000-E8F7-9D6702DB81A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zw66-wib5_n2in"><intent_id>747187</intent_id><project_id>785294</project_id><text_data>TELECOMMUNICATIONS TECHNICIAN TO TROUBLESHOOT AND REPAIR THEIR TALK-PHONE AND SPEAKERS.</text_data><comment_date>2016-02-17T00:00:00</comment_date></row><row _id="row-f73k.dmih.xer9" _uuid="00000000-0000-0000-4633-A2FE7884B84F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f73k.dmih.xer9"><intent_id>1030028</intent_id><project_id>859219</project_id><text_data>This job will involve landscaping, installing topsoil, installing irrigation system, and installing bark and compost.</text_data><comment_date>2020-01-08T00:00:00</comment_date></row><row _id="row-zbzy.7et8.v3u4" _uuid="00000000-0000-0000-0196-7FE99585CC7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zbzy.7et8.v3u4"><intent_id>672967</intent_id><project_id>742243</project_id><text_data>installed 12&amp;#39; 700 series wiremold for interior section of ADA pushbutton station for door opener. Installed and set in sawcut 3/4 pvc run for exterior pushbutton post. Relanded mc wiring in door controllers for 120v.</text_data><comment_date>2015-01-09T00:00:00</comment_date></row><row _id="row-giy9-6gxz_aqqy" _uuid="00000000-0000-0000-D4EA-FD7E0C519FF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-giy9-6gxz_aqqy"><intent_id>895944</intent_id><project_id>801894</project_id><text_data>1170102 - North Satellite (NSAT)</text_data><comment_date>2018-03-30T00:00:00</comment_date></row><row _id="row-5kyg_54um.6whb" _uuid="00000000-0000-0000-99D0-032FA360A171" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5kyg_54um.6whb"><intent_id>950753</intent_id><project_id>868670</project_id><text_data>service and inspect gas furnace.</text_data><comment_date>2018-12-13T00:00:00</comment_date></row><row _id="row-drmm.fb56-n3tv" _uuid="00000000-0000-0000-5793-0ED15FE61068" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-drmm.fb56-n3tv"><intent_id>754562</intent_id><project_id>788682</project_id><text_data>From: Bill Brosseau [mailto:Bill@earthcorps.org] Sent: Thursday, December 14, 2017 2:54 PMTo: Nelson, Aaron W (LNI) &amp;lt;neaa235@LNI.WA.GOV&amp;gt;Subject: RE: EarthCorps- InquiryAaron,Thank you for your reply, it�s appreciated. Allow me to clarify, what I meant to say is that the approved intent (#754562) does not clearly state that the contract is an �on-call contract� which is what L&amp;I has requested, though in truth the contract is such a contract for the timeframe of 02/01/16 � 05/29/19. Is it possible to add �on-call contract 02/01/16 � 05/29/19� to the approved intent? If not then should we request a new intent with the on-call language or is it simply not required.I hope that helps clarify my question, and again thank you for your help.BillBILL BROSSEAUOperations Director</text_data><comment_date>2017-12-21T00:00:00</comment_date></row><row _id="row-rzhe~k6bx.qj3x" _uuid="00000000-0000-0000-AE48-40AA19658DAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzhe~k6bx.qj3x"><intent_id>882437</intent_id><project_id>823726</project_id><text_data>SV31197</text_data><comment_date>2018-01-09T00:00:00</comment_date></row><row _id="row-tkqd~6n5a-w2hb" _uuid="00000000-0000-0000-5F4B-F589B6228D0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tkqd~6n5a-w2hb"><intent_id>900996</intent_id><project_id>844157</project_id><text_data>The entire scope of this project is site drainage improvements by the main contractor.  Our portion will be fraizing (or thatching) the grass with a small kubota tractor under 90 hp. and hauling it away in a 1 ton single axle truck. The work will be finished in one day.</text_data><comment_date>2018-04-26T00:00:00</comment_date></row><row _id="row-eknr-rcsu_ri7h" _uuid="00000000-0000-0000-2B2B-BE1F311BFDF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eknr-rcsu_ri7h"><intent_id>1042596</intent_id><project_id>910861</project_id><text_data>#1 - Describe the work that your firm was contracted to perform INSULATION#2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer 'yes' or 'no' to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2020-03-03T00:00:00</comment_date></row><row _id="row-fdjs~hm8a-h8z2" _uuid="00000000-0000-0000-2AFE-FE19107DF385" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fdjs~hm8a-h8z2"><intent_id>951846</intent_id><project_id>869202</project_id><text_data>TITAN Job 1842</text_data><comment_date>2018-12-20T00:00:00</comment_date></row><row _id="row-nyfa~ub9r_kjfs" _uuid="00000000-0000-0000-43BD-E679834CF7B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nyfa~ub9r_kjfs"><intent_id>669971</intent_id><project_id>750835</project_id><text_data>Form filed by: Roy Safford</text_data><comment_date>2014-12-16T00:00:00</comment_date></row><row _id="row-aega-rur9_y92e" _uuid="00000000-0000-0000-9E6D-4DCA1AD88552" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aega-rur9_y92e"><intent_id>914001</intent_id><project_id>844147</project_id><text_data>There is no appliance installer category -I was advised to used general laborer category</text_data><comment_date>2018-06-27T00:00:00</comment_date></row><row _id="row-w7dr~qe8y-q95q" _uuid="00000000-0000-0000-0041-655125ABCC55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w7dr~qe8y-q95q"><intent_id>862831</intent_id><project_id>831913</project_id><text_data>Job # 16317</text_data><comment_date>2017-09-14T00:00:00</comment_date></row><row _id="row-up9x.hdxk~348j" _uuid="00000000-0000-0000-35E6-01A6F0F6B1DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-up9x.hdxk~348j"><intent_id>1115707</intent_id><project_id>946870</project_id><text_data>Fringes: Vacation $4.00, Assessment $1.30, Insurance $9.01, Pension $14.55, Training $2.08, Industry Improvement $.50</text_data><comment_date>2021-01-17T00:00:00</comment_date></row><row _id="row-wwbu_7pim~89a2" _uuid="00000000-0000-0000-33A5-ECA76D8CC0FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wwbu_7pim~89a2"><intent_id>668884</intent_id><project_id>750287</project_id><text_data>This entire project is to prune the trees through-out the whole property.  The owner will be using pruning shears, and a chain saw, and 1-2 laborers will be collecting the limbs and debris and putting them in a truck and trailer to haul to the dump.</text_data><comment_date>2014-12-08T00:00:00</comment_date></row><row _id="row-c8cs-pmqy_wedz" _uuid="00000000-0000-0000-162B-A4AF77B5946C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c8cs-pmqy_wedz"><intent_id>554685</intent_id><project_id>704417</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations: Laborer: Common or General - Rate: $19.73 / Fringe: $4.63</text_data><comment_date>2013-02-04T00:00:00</comment_date></row><row _id="row-vz6t-9i4m~kiww" _uuid="00000000-0000-0000-FD6D-ABDC05DC0AFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vz6t-9i4m~kiww"><intent_id>908872</intent_id><project_id>852461</project_id><text_data>Annual contract, Vertiv SID 149858, Quote 02793011</text_data><comment_date>2018-06-05T00:00:00</comment_date></row><row _id="row-we9i_hns5.icca" _uuid="00000000-0000-0000-AE1F-5C18C8C6B8CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-we9i_hns5.icca"><intent_id>768311</intent_id><project_id>793959</project_id><text_data>Job # 108149-001 related to 201207-003</text_data><comment_date>2016-06-14T00:00:00</comment_date></row><row _id="row-3xc5~eg6f~7hy6" _uuid="00000000-0000-0000-77A7-EE0F774C84C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3xc5~eg6f~7hy6"><intent_id>808217</intent_id><project_id>805449</project_id><text_data>Job #109392-001Installing new Fiber and CAT 6 Cable for data, comm, and power feed to grey space. All work is done indoors at SeaTac Airport</text_data><comment_date>2016-12-21T00:00:00</comment_date></row><row _id="row-3fzb.yuf3_k8ar" _uuid="00000000-0000-0000-79CB-6AF6C14A206B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3fzb.yuf3_k8ar"><intent_id>1247746</intent_id><project_id>1021224</project_id><text_data>Crawlspace cleaning from sewage backup</text_data><comment_date>2022-07-11T00:00:00</comment_date></row><row _id="row-h82p~5tsb~brb8" _uuid="00000000-0000-0000-CACD-B15FBEE30B64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h82p~5tsb~brb8"><intent_id>863972</intent_id><project_id>829353</project_id><text_data>Filed by Seanna Trentman</text_data><comment_date>2017-09-20T00:00:00</comment_date></row><row _id="row-qpjj~aeks-gcz5" _uuid="00000000-0000-0000-F330-E688B7BDE0D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qpjj~aeks-gcz5"><intent_id>841905</intent_id><project_id>824927</project_id><text_data>Invoice to be sent to:  Grant County PUD, ATTN:  Vanessa Seldal 30 C Street SW, Ephrata WA  98823</text_data><comment_date>2017-06-20T00:00:00</comment_date></row><row _id="row-tgg4_jt5u_c4g4" _uuid="00000000-0000-0000-B3F4-80329FC8907F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tgg4_jt5u_c4g4"><intent_id>467465</intent_id><project_id>670644</project_id><text_data>This project will consist of spraying and removal of unwanted vegetation and installation of soil at the above location. Equipment to be used will be a backpack sprayer, shovels, rakes, buckets, hand held hedge trimmers, wheelbarrows, rakes and a backpack blower for the purpose of cleaning any debris from the above mentioned work.</text_data><comment_date>2011-07-21T00:00:00</comment_date></row><row _id="row-nza3~cxd5_3ck9" _uuid="00000000-0000-0000-2690-08B78130F407" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nza3~cxd5_3ck9"><intent_id>538083</intent_id><project_id>697206</project_id><text_data>The raingutters that are mounted on the building exterior are connected to plastic pipe to divert rain water out in too the yard and need to be rerouted and buried before the weed barrier and bark are applied.  Backfill, compact and level area where pool had been.  Ground needs to be covered with a weed resistant material to keep weed from growing back and covered in decorative bark,  install a ADA wheelcahir ramp with handrails and a landing at the end of ramp.  Square cut deck to make it uniform, repair and install handrail for deck, install 4-raised garden beds 3&amp;quot;X8'X21&amp;quot; with a timer and drip lines for watering, install/build a greenhouse/storage shed 8'wX 12'L X 8' in height.  This area is fenced in on two sides with a 6' cyclone fence and the building on the other 2 sides.  You must make every effort possible to keep damage to the grass and sprinkler system minimal as you will be responsible for repairing any damages to the sprinkler system, fence and grass.  We have removed 30' of the fence for access to the work area.  When the project is finished you will need to extend this section of the fence out 9 more feet and move the 2 sprinkler heads out as well. Our company will be completing all of the above work.  We will be using a Bobcat, shovels, hammers</text_data><comment_date>2012-10-08T00:00:00</comment_date></row><row _id="row-7ize.igq6.v2dd" _uuid="00000000-0000-0000-D9C5-4CE3E12E7627" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ize.igq6.v2dd"><intent_id>1245633</intent_id><project_id>1020084</project_id><text_data>sr51138770</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-m5ne-a86q_bt9f" _uuid="00000000-0000-0000-8D5C-93980A4FE110" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m5ne-a86q_bt9f"><intent_id>1171410</intent_id><project_id>955803</project_id><text_data>Installation of irrigation using shovel and picks and a mini excavator   and installing arborist mulch</text_data><comment_date>2021-08-23T00:00:00</comment_date></row><row _id="row-vxj9~pktj-a8w4" _uuid="00000000-0000-0000-1DD5-4B14C9575368" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vxj9~pktj-a8w4"><intent_id>1211867</intent_id><project_id>999777</project_id><text_data>Installation of a Trane heat pumpSingle Family Dwelling1a. no b. no c. yes d. no e. no f. no g. no h. no i. no j. no k. no l. noyesyesno no</text_data><comment_date>2022-02-16T00:00:00</comment_date></row><row _id="row-xhn7.dn8s~a7dc" _uuid="00000000-0000-0000-AA1D-D6B88EB96D34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xhn7.dn8s~a7dc"><intent_id>485406</intent_id><project_id>674143</project_id><text_data>TRUCK DRIVER OTHER USSED FOR TRUCK MOUNTED PICKUP SWEEPER</text_data><comment_date>2011-10-24T00:00:00</comment_date></row><row _id="row-b3gs~cfu7~2bsk" _uuid="00000000-0000-0000-80FE-1BA8476070A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b3gs~cfu7~2bsk"><intent_id>541217</intent_id><project_id>346134</project_id><text_data>L&amp;J's Construction LLC is filing on behalf of The Greyraven Company because they have refused to file.</text_data><comment_date>2012-10-23T00:00:00</comment_date></row><row _id="row-9k4f_52di_xy4s" _uuid="00000000-0000-0000-4FA2-A9140E3116A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9k4f_52di_xy4s"><intent_id>565054</intent_id><project_id>709041</project_id><text_data>https://secureaccess.wa.gov/lni/pwia/Images/iconInformation.gif</text_data><comment_date>2013-04-17T00:00:00</comment_date></row><row _id="row-i2tq~zsw2-drpk" _uuid="00000000-0000-0000-C355-A3A98FFD8C44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2tq~zsw2-drpk"><intent_id>496777</intent_id><project_id>681335</project_id><text_data>Below is the agreement currently in effect between the Prevailing Wage Program and the Port of Seattle with respect to certain Small Works, Open Order Contracts:The use of Small Works, Open Order Contracts for projects subject to the prevailing wage law, Chapter 39.12 RCW, when within all the limits and requirements listed below, can comply with the state�s prevailing wage law. :�The contract is awarded under the public agency�s small works authority;�The total contract �not to exceed� dollar value is within the small works authority in law and the agency�s adopted policy;�The contract identifies the specific  trade and occupation;�The contract term is for a specific duration of up to one year - Option(s) to extend may be included provided the prevailing rate of wage is updated annually as described below;�A specific job location must be identified in the contract (not just �to be determined� TBD);�There may be no splitting of contracts to come in under the applicable dollar limit(s);�The contract is for a single, individual prime contractor;�Any subcontractors must file a set of Intent and Affidavit forms for each individual work authorization (not an annual filing);�Each voucher submitted for payment must include a compliance statement per RCW 39.12.040(1); and�Individual work authorizations issued under the Open Order Contract must define the specific work to be performed.For open order, small works contracts that conform to all the requirements above, the prime contractor may file an annual set of the prevailing wage paperwork, i.e. open each contract year with a Statement of Intent to Pay Prevailing Wages form and close each contract year with an Affidavit of Wages Paid form. Subcontractors must file an Intent and Affidavit for each work authorization and subcontract. The subcontractors will use the prime contractor�s bid due date for their forms filings. For these small works open order contracts, the prevailing wage rates which are in effect on the date when the bids are required to be submitted to the contract awarding public agency are the minimum prevailing wage rates which must be paid for the first year of such contracts and thereafter. However, any small works open order contract of more than one year duration, must include wage increase language recognizing the potential for future variance in applicable prevailing wage(s) and specifying that the wages which a contractor shall pay its employees must be altered annually to recognize and follow the most recently promulgated increases in prevailing wages each year after the first year of the contract period. The cost of the increases in the wages due employees shall be borne by the contract awarding agency.You may have questions about contracts that are not small works. This answer does not address those situations. Please let us know the details of anticipated actions that are not fully addressed by this message.  (chrr235)</text_data><comment_date>2012-02-21T00:00:00</comment_date></row><row _id="row-r8mn_pvq5-3akb" _uuid="00000000-0000-0000-9A4D-DDF667DAA2AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r8mn_pvq5-3akb"><intent_id>622979</intent_id><project_id>719995</project_id><text_data>We do not have a breakdown calculation</text_data><comment_date>2014-05-16T00:00:00</comment_date></row><row _id="row-jg74~ifqv~7aqw" _uuid="00000000-0000-0000-C829-DC78D52DC3C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jg74~ifqv~7aqw"><intent_id>1083323</intent_id><project_id>917893</project_id><text_data>JW NEBF $1.76, H+W $9.80, Pension $9.88, 401K $2.00, JATC $0.83</text_data><comment_date>2020-08-26T00:00:00</comment_date></row><row _id="row-dys2_n5qa-x3pt" _uuid="00000000-0000-0000-EEE2-34F83401C4EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dys2_n5qa-x3pt"><intent_id>477667</intent_id><project_id>674294</project_id><text_data>Fringe benefit package equals $1.60 per hour health insurance, .96 Vacation, .48 Sick time, .69 Holiday, 1.27 FICA, 1.00 Bonus, 4.00 Personal Truck Use</text_data><comment_date>2011-10-05T00:00:00</comment_date></row><row _id="row-qg4f.pfqn~di3d" _uuid="00000000-0000-0000-FB33-4FCB2E3270FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qg4f.pfqn~di3d"><intent_id>974033</intent_id><project_id>879520</project_id><text_data>FILED BY DAVID DEMING</text_data><comment_date>2019-04-25T00:00:00</comment_date></row><row _id="row-44w9.r5fc.j898" _uuid="00000000-0000-0000-84FF-A1900B02DF8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-44w9.r5fc.j898"><intent_id>751151</intent_id><project_id>787112</project_id><text_data>Hello:-) We don&amp;#39;t have a contractors registration number because we don&amp;#39;t remove the meters being tested. They stay in the ground and in service while they are being tested. We are only testing them for accuracy which is a service. I spoke to Pam Burgman about this in 2011 and she told me we don&amp;#39;t need a contractors registration number because we do not replace water meters, we only repair them which is a service. I also spoke to Bruce Springer about this in 2013 and he told me the same thing. Have a great day!!!</text_data><comment_date>2016-03-13T00:00:00</comment_date></row><row _id="row-as34_tggh.ejgq" _uuid="00000000-0000-0000-90E8-A2876A255D57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-as34_tggh.ejgq"><intent_id>773624</intent_id><project_id>794146</project_id><text_data>General Labor - Shoveling asphaltOther Truck - Lowboy, mob equipment</text_data><comment_date>2016-07-10T00:00:00</comment_date></row><row _id="row-7rnd-3ahc~scwq" _uuid="00000000-0000-0000-DC10-27B528E7B528" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7rnd-3ahc~scwq"><intent_id>1066065</intent_id><project_id>903346</project_id><text_data>New intent due to Name change/update (LLC to Inc.)</text_data><comment_date>2020-06-17T00:00:00</comment_date></row><row _id="row-ep6y.i3mf~gxak" _uuid="00000000-0000-0000-65D2-CA17528ED824" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ep6y.i3mf~gxak"><intent_id>617506</intent_id><project_id>729690</project_id><text_data>5144 Beach Way NE, Olympia</text_data><comment_date>2014-02-24T00:00:00</comment_date></row><row _id="row-rkj2~bj4c~7y2p" _uuid="00000000-0000-0000-0DFC-0E5F1040A8DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rkj2~bj4c~7y2p"><intent_id>838345</intent_id><project_id>822483</project_id><text_data>dump trucks</text_data><comment_date>2017-06-05T00:00:00</comment_date></row><row _id="row-bnp9~ndpk.2mze" _uuid="00000000-0000-0000-123C-9BAC2E488135" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bnp9~ndpk.2mze"><intent_id>701695</intent_id><project_id>761137</project_id><text_data>$13.64 Fringe BreakdownHeath Care - $7.41/hourPension - $5.50/hourApprentice - $0.73/hour$13.66 Fringe Breakdown:$5.50 � Pension$7.41 � Health Care$0.75 � Apprenticeship Program$26.28 Fringe Breakdown:$11.52 - Pension$10.98 - Health Care$3.78 - Apprenticeship Program</text_data><comment_date>2015-06-18T00:00:00</comment_date></row><row _id="row-y436.pny8-qqvp" _uuid="00000000-0000-0000-10B3-379E94EBD5CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y436.pny8-qqvp"><intent_id>894290</intent_id><project_id>845163</project_id><text_data>Curbing will be placed by using a curbing machine and will be affixed with epoxy.</text_data><comment_date>2018-04-13T00:00:00</comment_date></row><row _id="row-5wkc~5cig-ird6" _uuid="00000000-0000-0000-3B51-1FA4D221684D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5wkc~5cig-ird6"><intent_id>941062</intent_id><project_id>864560</project_id><text_data>S027971</text_data><comment_date>2018-10-22T00:00:00</comment_date></row><row _id="row-3u9p.6r2y.eedm" _uuid="00000000-0000-0000-516E-BB09D4CB140A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3u9p.6r2y.eedm"><intent_id>465261</intent_id><project_id>669840</project_id><text_data>This project is a work order on a job order contract for Centennial Contractors, CCE#71610-0114.</text_data><comment_date>2011-07-12T00:00:00</comment_date></row><row _id="row-f2ev-4934-mnnm" _uuid="00000000-0000-0000-1E8C-A50C020FFF6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f2ev-4934-mnnm"><intent_id>885331</intent_id><project_id>839889</project_id><text_data>A) the clinic had a water damage to the main floor. I believe it was caused by a broken pipe.B) our general laborers helped with the removing demo debris between the affected areas and the garbage dumpsters out side. Other general laborers helped in the air duct cleaning process with moving ladders around and moving hoses and cleaning vents/registers. Our sheet metal worker was cutting access wholes into the ductwork and vacuuming out the ductwork. C) tools used by gl was wheel barrow and small hand tools, no power tools.</text_data><comment_date>2018-01-30T00:00:00</comment_date></row><row _id="row-4uaq-5m4t~dha6" _uuid="00000000-0000-0000-9A5E-A0AC701CF633" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4uaq-5m4t~dha6"><intent_id>637879</intent_id><project_id>738160</project_id><text_data>Project Full Name - Administration Building, Interior Paint, Special Services Repaint.</text_data><comment_date>2014-06-27T00:00:00</comment_date></row><row _id="row-yrxu_nxt8~46ka" _uuid="00000000-0000-0000-8505-F3A5C4CDBB57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yrxu_nxt8~46ka"><intent_id>583008</intent_id><project_id>715129</project_id><text_data>CLP Resources is a temporary labor service provider and is therefore exempt from the requirement to obtain a contractors license.</text_data><comment_date>2013-07-24T00:00:00</comment_date></row><row _id="row-6yhd~q7p2_rri4" _uuid="00000000-0000-0000-A4B6-6970CEACE4DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6yhd~q7p2_rri4"><intent_id>927909</intent_id><project_id>851051</project_id><text_data>GU Job #18225Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2018-08-23T00:00:00</comment_date></row><row _id="row-96vd-3q5d.xnzy" _uuid="00000000-0000-0000-783C-416DDFC929FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96vd-3q5d.xnzy"><intent_id>1221057</intent_id><project_id>1005641</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with the wage rate determined by the Secretary of HUD to be prevailing in the locality with respect to such trade or position as provided under 24 CFR 965.101(a)(2)(iv).  BCI Project No. HS1014Filed by Kathi Clark</text_data><comment_date>2022-03-28T00:00:00</comment_date></row><row _id="row-492x_vqr2_k5gv" _uuid="00000000-0000-0000-3BE5-759073C44495" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-492x_vqr2_k5gv"><intent_id>1108242</intent_id><project_id>942643</project_id><text_data>All Fringes paid into wage. None paid by company.</text_data><comment_date>2021-01-08T00:00:00</comment_date></row><row _id="row-4892.wm3r_pr7u" _uuid="00000000-0000-0000-FA20-C93BAC07191E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4892.wm3r_pr7u"><intent_id>1024953</intent_id><project_id>887538</project_id><text_data>Type of work irrigation repair, general landscape, troubleshooting broken irrigation, digging trenching, gluing pipe, sprinkler heads replacement and insulations, drip irrigation.Types of equipment use: 3/4 ton truck, dump trailers, trencher</text_data><comment_date>2020-01-23T00:00:00</comment_date></row><row _id="row-v8mg~3nek~t6mq" _uuid="00000000-0000-0000-EA37-5A6FA5621722" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8mg~3nek~t6mq"><intent_id>492394</intent_id><project_id>679016</project_id><text_data>Soft Floor Layer - Jamie Nunez Castro (owner)</text_data><comment_date>2011-12-07T00:00:00</comment_date></row><row _id="row-kz9y-wzk9-9q2d" _uuid="00000000-0000-0000-D648-FCC60F1B1ADA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kz9y-wzk9-9q2d"><intent_id>579938</intent_id><project_id>715043</project_id><text_data>Decontaminate roomClean and decontaminate room using rags, sponges and/or small hand tools</text_data><comment_date>2013-07-09T00:00:00</comment_date></row><row _id="row-bqb4.p333~e6b7" _uuid="00000000-0000-0000-B362-BE4AE72B9A49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bqb4.p333~e6b7"><intent_id>611713</intent_id><project_id>721601</project_id><text_data>143007Provide and install category 6 cabling for camera's. Terminate, test, and label.</text_data><comment_date>2014-01-13T00:00:00</comment_date></row><row _id="row-dzqd~33bw_m63k" _uuid="00000000-0000-0000-D5FB-6205F60D18F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dzqd~33bw_m63k"><intent_id>1222113</intent_id><project_id>892711</project_id><text_data>Per your Correction Request:A). Customers Refused Skanska's floor trough and sink.  They were a trip hazard and must be repaired.  Sinks needed to be lowered.B). Scope of work to include removing tile around all floor sinks and troughs 'By Skanska'.  Fabricating New flanged top at shop.  Welding New flanges on existing sinks and tile reinstalled/ repaired by Skanska.C).  Metal Fabrication 'In Shop' to include, laying out metal to be cut, cut metal, bend metal, weld and polish metal.   Tools Used: pens, squares, computer, tape measure, welder and grinder were used.</text_data><comment_date>2022-04-27T00:00:00</comment_date></row><row _id="row-2ksy-za2w.8z3g" _uuid="00000000-0000-0000-A35F-CE0CFFB6F883" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ksy-za2w.8z3g"><intent_id>1110311</intent_id><project_id>923223</project_id><text_data>ENTIRE PROJECT SCOPE: Colville Construction Inc. is the General Contractor with a lot of specialized sub-contractors. The scope of the project was to install a new water storage tank for the town of Northport Washington. This involved site prep ( which was dirt work, stabilization walls and rock work). Concrete footing and base for the tank to sit on. Installation and construction of the water tank structure.  Electrical monitor and controls of tank water level. Electrical pumping control to distribute the water to the town.  OUR SCOPE: Soggy Bottom is contracted only to install Hydroseeding in 500SQ YRD area. The hydroseeding is for bank stabilization to prevent run off and erosion control until it establishes a good grass seed bed. We plan (8) hours into this project with (3) guys.</text_data><comment_date>2020-12-17T00:00:00</comment_date></row><row _id="row-5y3x.v9jc-csu3" _uuid="00000000-0000-0000-0B74-2328DB348CE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5y3x.v9jc-csu3"><intent_id>879841</intent_id><project_id>839731</project_id><text_data>Water damage dry out, set dehumidifiers, fans and containment. Use van to services equipment.</text_data><comment_date>2017-12-18T00:00:00</comment_date></row><row _id="row-yce6~w6uw-n8tw" _uuid="00000000-0000-0000-9888-44769CEC0639" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yce6~w6uw-n8tw"><intent_id>690053</intent_id><project_id>754204</project_id><text_data>Trucks are owned by Tiger Mountain Rental, drivers are paid by Lakeridge Paving co. LLC</text_data><comment_date>2015-04-20T00:00:00</comment_date></row><row _id="row-88f3_7er7-s59f" _uuid="00000000-0000-0000-E776-6F48CC662FCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-88f3_7er7-s59f"><intent_id>938781</intent_id><project_id>857720</project_id><text_data>Darin Spangle, Owner Performed the Work</text_data><comment_date>2018-10-10T00:00:00</comment_date></row><row _id="row-b3pa_hx4y_xbdh" _uuid="00000000-0000-0000-2862-794ECE072447" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b3pa_hx4y_xbdh"><intent_id>939687</intent_id><project_id>863997</project_id><text_data>0418193</text_data><comment_date>2018-10-15T00:00:00</comment_date></row><row _id="row-qa9g.95qr-jbap" _uuid="00000000-0000-0000-C7C9-5FF5F436C12D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qa9g.95qr-jbap"><intent_id>791298</intent_id><project_id>774737</project_id><text_data>Here is the answer to your question &amp;quot;***1 Please describe the purpose of the sump plates and what the sump plates are being attached to. &amp;quot;We did welding to the temporary shoring 06/24/2016 and welding on the sump plates on 6/28/2016.  The &amp;quot;sump plates&amp;quot; are steel plates that are part of the precast concrete sump. These plates are welded to similar steel plates in the base slab of the precast concrete storm water detention vault. The purpose of the sump plates is to connect  the sump to the base slab of the storm water detention vault.</text_data><comment_date>2016-12-02T00:00:00</comment_date></row><row _id="row-2kij~ync7~jptj" _uuid="00000000-0000-0000-9036-6B8BF34A43D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2kij~ync7~jptj"><intent_id>1212103</intent_id><project_id>999918</project_id><text_data>TRM Services is the General/Prime Contractor on this project. In addition to self performing Electrical, Plumbing &amp; HVAC/Sheet Metal, we will have subcontractors and general clean up labor for the jobsite.</text_data><comment_date>2022-02-16T00:00:00</comment_date></row><row _id="row-6bdt~6w5c.yjtc" _uuid="00000000-0000-0000-DB28-DF52F20F0533" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6bdt~6w5c.yjtc"><intent_id>779659</intent_id><project_id>797616</project_id><text_data>SCAFFOLD DIVISION</text_data><comment_date>2016-08-03T00:00:00</comment_date></row><row _id="row-hxcu.hkvq.wwfv" _uuid="00000000-0000-0000-ACB2-F55C0FE27A79" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxcu.hkvq.wwfv"><intent_id>821423</intent_id><project_id>815919</project_id><text_data>Fringe</text_data><comment_date>2017-03-17T00:00:00</comment_date></row><row _id="row-638c~7u9n.ahin" _uuid="00000000-0000-0000-6FF3-80448C17268C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-638c~7u9n.ahin"><intent_id>1279056</intent_id><project_id>1037754</project_id><text_data>PO#830901</text_data><comment_date>2022-10-31T00:00:00</comment_date></row><row _id="row-8q2d-gf23_zcq7" _uuid="00000000-0000-0000-412B-47B16E3484FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8q2d-gf23_zcq7"><intent_id>664925</intent_id><project_id>741905</project_id><text_data>We are based in Gresham, Oregon, so we have our Worker's Compensation insurance through SAIF, policy #926498.</text_data><comment_date>2014-11-11T00:00:00</comment_date></row><row _id="row-d3pw_pz6h_rrgz" _uuid="00000000-0000-0000-540A-E156A3544F99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d3pw_pz6h_rrgz"><intent_id>1285539</intent_id><project_id>995025</project_id><text_data>11.22.22Owner may or may not perform work on this project.</text_data><comment_date>2022-11-22T00:00:00</comment_date></row><row _id="row-mfdw_52hs.957h" _uuid="00000000-0000-0000-25D7-797A6C115D2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mfdw_52hs.957h"><intent_id>1120465</intent_id><project_id>949498</project_id><text_data>WO#24841Job#2698</text_data><comment_date>2021-02-05T00:00:00</comment_date></row><row _id="row-ayjw_2rx8_7ejh" _uuid="00000000-0000-0000-7DEF-F99445CFCFF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ayjw_2rx8_7ejh"><intent_id>935709</intent_id><project_id>862488</project_id><text_data>SEAMAINT 09-01-18 THRU 08-31-19PO # 1000645723</text_data><comment_date>2018-09-26T00:00:00</comment_date></row><row _id="row-6ewc-edrh~6h43" _uuid="00000000-0000-0000-3132-655AA32FCBC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ewc-edrh~6h43"><intent_id>689633</intent_id><project_id>759106</project_id><text_data>General Laborer consists of the following:Hand work (no power tools or equipment) $28.33 p/hour + $7.08 fringe (fringe all goes to pension)Blade Operator is used for grading the project site for compaction before paving or chip sealing operations $32.43 p/hour + $8.11 fringe (fringe all goes to pension)Other trucks consists of the following:1) 0 to 8,000 gallon water truck used to help compaction during the grading process and dust control $22.87 p/hour + $5.72 fringe (fringe all goes to pension)2) Oil distributor - used for oil distribution for chip sealing operations $22.87 p/hour + $5.72 fringe (fringe all goes to pension)</text_data><comment_date>2015-04-17T00:00:00</comment_date></row><row _id="row-2a5q_immd-hvp7" _uuid="00000000-0000-0000-793B-D14B6FC1B56B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2a5q_immd-hvp7"><intent_id>645703</intent_id><project_id>740985</project_id><text_data>**** there was 2 employees for this job, only 1 employee used the scissor lift and did the power washing. The second employee only had 9.5 hours and was on the job to help set up and clean up and did not acutaully do any of the work. The second employee does fall under tha janitorial, he made sure that the area around the work site was clean of debris for safetly. What classification do I use for the employee that used the scissor lift and pressure washed? Power Equip operator or laborere/Nozzelman?</text_data><comment_date>2014-08-21T00:00:00</comment_date></row><row _id="row-ipfk.xm6a-bgt7" _uuid="00000000-0000-0000-62E3-EC79B7371016" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ipfk.xm6a-bgt7"><intent_id>1068689</intent_id><project_id>923878</project_id><text_data>JM Fringes: Insurance $12.77, Pension $14.53, Training $1.27, Industry Fund $.65, Organization Trust $1.00, Clean Card $.07</text_data><comment_date>2020-06-29T00:00:00</comment_date></row><row _id="row-5d6v~sv22_zv9n" _uuid="00000000-0000-0000-68E2-012513BDE1D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5d6v~sv22_zv9n"><intent_id>539551</intent_id><project_id>693621</project_id><text_data>Fringe Breakdown:$28.11--$5.00 Medical, $1.00 Vacation, $1.00 Holiday, 21.11 Pension$17.65--No Fringe</text_data><comment_date>2012-10-12T00:00:00</comment_date></row><row _id="row-f5vk-ki33~dzez" _uuid="00000000-0000-0000-ECEF-EEFE730A72DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f5vk-ki33~dzez"><intent_id>701555</intent_id><project_id>761477</project_id><text_data>Owner Operated</text_data><comment_date>2015-06-17T00:00:00</comment_date></row><row _id="row-wx2h~ptxr_ts22" _uuid="00000000-0000-0000-0ADE-F0AE60B8F169" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wx2h~ptxr_ts22"><intent_id>592027</intent_id><project_id>716867</project_id><text_data>Form Filed By: Michael Hummel</text_data><comment_date>2013-09-05T00:00:00</comment_date></row><row _id="row-fyec~rmmh~hw5n" _uuid="00000000-0000-0000-4E82-A81649DB5803" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fyec~rmmh~hw5n"><intent_id>728184</intent_id><project_id>775342</project_id><text_data>Labor duties include sweeping, shoveling, dust control (water hose), loading trailers</text_data><comment_date>2015-10-26T00:00:00</comment_date></row><row _id="row-nai8_znzm~ian3" _uuid="00000000-0000-0000-0A78-083DD01E9A0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nai8_znzm~ian3"><intent_id>716756</intent_id><project_id>770123</project_id><text_data>General Laborer: Performs work of shoveling with a hand shovel, cleaning-sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket.Other Trucks: A Low Boy trailer for delivery and pickup of equipment.</text_data><comment_date>2015-08-26T00:00:00</comment_date></row><row _id="row-snn6.sgq6~ybhn" _uuid="00000000-0000-0000-427B-1010EDF3D757" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-snn6.sgq6~ybhn"><intent_id>1318044</intent_id><project_id>1062406</project_id><text_data>9915569</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-baba-kr6q_3fuc" _uuid="00000000-0000-0000-C674-729063A3C8E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-baba-kr6q_3fuc"><intent_id>637313</intent_id><project_id>732557</project_id><text_data>job #3734</text_data><comment_date>2014-06-25T00:00:00</comment_date></row><row _id="row-nhia_2nkp_9wtz" _uuid="00000000-0000-0000-0651-9B5E6AA5FFF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nhia_2nkp_9wtz"><intent_id>1001953</intent_id><project_id>878817</project_id><text_data>I am an Oregon based Business and am not required to have Industrial Insurance Have have an Oregon Workers comp policy for my employees.</text_data><comment_date>2020-04-22T00:00:00</comment_date></row><row _id="row-yc5v.cdfg-6tjd" _uuid="00000000-0000-0000-6411-354CB5591F34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yc5v.cdfg-6tjd"><intent_id>744583</intent_id><project_id>768244</project_id><text_data>PCI Job Number 15-13218, 15-13280, 15-13313</text_data><comment_date>2016-02-02T00:00:00</comment_date></row><row _id="row-2wq9~kk49-p2dh" _uuid="00000000-0000-0000-CB5F-449349A62FB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2wq9~kk49-p2dh"><intent_id>474138</intent_id><project_id>669500</project_id><text_data>Power Equipment Operator Motor Patrol Grader Finishing is wage band selected for our Vacuum Truck Operator.</text_data><comment_date>2011-08-24T00:00:00</comment_date></row><row _id="row-rzdv~tb9j.wffs" _uuid="00000000-0000-0000-6312-2ACC2EEB8EB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzdv~tb9j.wffs"><intent_id>1222747</intent_id><project_id>1006697</project_id><text_data>WORK FOR PAUL ANDERSON @ 156TH SE</text_data><comment_date>2022-04-02T00:00:00</comment_date></row><row _id="row-7ewm~isbe.3cwb" _uuid="00000000-0000-0000-2050-59FEB1232E21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ewm~isbe.3cwb"><intent_id>745054</intent_id><project_id>784337</project_id><text_data>Filed by Carol Middaugh</text_data><comment_date>2016-02-04T00:00:00</comment_date></row><row _id="row-qzf9_w7ai.s8gm" _uuid="00000000-0000-0000-7289-6BDC635897D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qzf9_w7ai.s8gm"><intent_id>593850</intent_id><project_id>717103</project_id><text_data>1.  Manufacture and install laminate countertops in Kitchen &amp; Bath2.  Apartments3.  2 story4.  a) no  b) no  c) yes  d) no  e) no  f) no g) no  h) no  i) no  j) no k)no5. Yes6.  Yes7.  No8.  No</text_data><comment_date>2013-09-19T00:00:00</comment_date></row><row _id="row-j96z_dk8e.nunu" _uuid="00000000-0000-0000-7247-C77F8518A2C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j96z_dk8e.nunu"><intent_id>614232</intent_id><project_id>709243</project_id><text_data>Filed by Ken Blair</text_data><comment_date>2014-01-29T00:00:00</comment_date></row><row _id="row-aa75_deti_shxj" _uuid="00000000-0000-0000-411D-FC5955A7B1DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aa75_deti_shxj"><intent_id>1458465</intent_id><project_id>1140820</project_id><text_data>Was unable to change the federal funds status. Please change from yes to no. If you have questions, pls call 360-452-5388 or directly 360-739-8339Thank you ~ Chelsey</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-cywg.scrw-hvt8" _uuid="00000000-0000-0000-9C70-D4735900EE60" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cywg.scrw-hvt8"><intent_id>1465835</intent_id><project_id>1080513</project_id><text_data>HDPE butt fusion machine</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-jhjr.vsa6_7pi7" _uuid="00000000-0000-0000-1A85-0ABB300FB6E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jhjr.vsa6_7pi7"><intent_id>642646</intent_id><project_id>739886</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2014-07-22T00:00:00</comment_date></row><row _id="row-mgr2_gy52.7zy3" _uuid="00000000-0000-0000-D934-FF2EFFD5CDC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mgr2_gy52.7zy3"><intent_id>568856</intent_id><project_id>710699</project_id><text_data>TERRY THECKSTON5825 118TH AVE CT E #49-APUYALLUP WA 98372</text_data><comment_date>2013-05-09T00:00:00</comment_date></row><row _id="row-ryse.uehg.x6ac" _uuid="00000000-0000-0000-85F6-D72C11F69B71" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ryse.uehg.x6ac"><intent_id>1239930</intent_id><project_id>1016861</project_id><text_data>9892275</text_data><comment_date>2022-06-09T00:00:00</comment_date></row><row _id="row-pnrw-zheq-faw5" _uuid="00000000-0000-0000-D0B8-18E850591C25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pnrw-zheq-faw5"><intent_id>1318032</intent_id><project_id>1062399</project_id><text_data>9911100</text_data><comment_date>2023-04-08T00:00:00</comment_date></row><row _id="row-fuz6.4ezw.whh9" _uuid="00000000-0000-0000-A742-2D95C7F375EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fuz6.4ezw.whh9"><intent_id>1318033</intent_id><project_id>1062400</project_id><text_data>9914996</text_data><comment_date>2023-04-08T00:00:00</comment_date></row><row _id="row-puyx.584p~4hbj" _uuid="00000000-0000-0000-5B8F-0BFA6790B6EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-puyx.584p~4hbj"><intent_id>1318037</intent_id><project_id>1062402</project_id><text_data>9915242</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-eh89.ncqt~s8ng" _uuid="00000000-0000-0000-9B1B-9A77A74B79ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eh89.ncqt~s8ng"><intent_id>545901</intent_id><project_id>700267</project_id><text_data>Sent email:  On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2013-02-19T00:00:00</comment_date></row><row _id="row-rg3y.jf8k.4h28" _uuid="00000000-0000-0000-6FA3-BBFBC7C63431" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rg3y.jf8k.4h28"><intent_id>1254877</intent_id><project_id>1013464</project_id><text_data>Job#22123</text_data><comment_date>2022-08-03T00:00:00</comment_date></row><row _id="row-m7sy-ke93~njvh" _uuid="00000000-0000-0000-2286-47DC3C0AB8D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7sy-ke93~njvh"><intent_id>1176884</intent_id><project_id>978955</project_id><text_data>#1-We were contracted to REPLACE HEAT PUMP. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2021-09-13T00:00:00</comment_date></row><row _id="row-aqqr.xc53~5ptt" _uuid="00000000-0000-0000-40EC-811A9D25CC3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aqqr.xc53~5ptt"><intent_id>1345418</intent_id><project_id>1037254</project_id><text_data>124111-001</text_data><comment_date>2023-07-18T00:00:00</comment_date></row><row _id="row-sw5w~db58-936a" _uuid="00000000-0000-0000-0715-D82AFB852E43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sw5w~db58-936a"><intent_id>658856</intent_id><project_id>744350</project_id><text_data>Hired by Malcolm Drilling</text_data><comment_date>2014-10-07T00:00:00</comment_date></row><row _id="row-nina_upyf.eify" _uuid="00000000-0000-0000-D14D-2801AE1A364F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nina_upyf.eify"><intent_id>582005</intent_id><project_id>681988</project_id><text_data>Filed by Cathi Barta</text_data><comment_date>2013-07-18T00:00:00</comment_date></row><row _id="row-na6j.4fpt-ckp4" _uuid="00000000-0000-0000-B742-ACE31026C1DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-na6j.4fpt-ckp4"><intent_id>1177105</intent_id><project_id>975518</project_id><comment_date>2021-09-13T00:00:00</comment_date></row><row _id="row-789a~w8kh.qhw2" _uuid="00000000-0000-0000-2C9E-08FD1AD440FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-789a~w8kh.qhw2"><intent_id>919888</intent_id><project_id>848494</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2018-07-21T00:00:00</comment_date></row><row _id="row-9im2.7kgj-fm9k" _uuid="00000000-0000-0000-F129-764C362B8355" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9im2.7kgj-fm9k"><intent_id>845645</intent_id><project_id>818676</project_id><text_data>2303 Moore</text_data><comment_date>2017-07-06T00:00:00</comment_date></row><row _id="row-8w69-xean_df5p" _uuid="00000000-0000-0000-6ADE-7342CD07E0BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8w69-xean_df5p"><intent_id>974046</intent_id><project_id>879524</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT, IT IS A SINGLE FAMILY RESIDENTIAL DWELLING.</text_data><comment_date>2019-04-25T00:00:00</comment_date></row><row _id="row-v7f2~jage.bux5" _uuid="00000000-0000-0000-C4A8-C1A4CAF3EE0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v7f2~jage.bux5"><intent_id>955406</intent_id><project_id>870894</project_id><text_data>1# Installation of heating equipment equipment and electrical panel replacement / moving meter. 2# Single family home has a kitchen bathroom and bedrooms3# multi story home with an attached garage4# The building is the primary place of abodeYesA) no The structure is not a place of businessB) NoC)YesD) NoE) NOF) NoG) NoH) NoI) NoJ) No#5 no#6 no#7 no#8 no</text_data><comment_date>2019-01-16T00:00:00</comment_date></row><row _id="row-isph~nv2x-f5tj" _uuid="00000000-0000-0000-D719-FAD0E9B56A3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-isph~nv2x-f5tj"><intent_id>632460</intent_id><project_id>734680</project_id><text_data>street sweeping at NE 119th St Railroad crossing</text_data><comment_date>2014-05-30T00:00:00</comment_date></row><row _id="row-ws5y.u2vr.wmgy" _uuid="00000000-0000-0000-0FA1-0E5C7263545B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ws5y.u2vr.wmgy"><intent_id>727974</intent_id><project_id>775265</project_id><text_data>1)Scope of Work: 2)Apartment Complex3)No Basement or Garage. Structure 1-2 levels.4)Income Qualified (low) Residential Housing A)No B)No C)Yes D)No E)No F)No G)No H)No I)No J)No K)No5)Yes6)Yes7)Yes8)No</text_data><comment_date>2015-10-23T00:00:00</comment_date></row><row _id="row-4ffg_7u5h_bjru" _uuid="00000000-0000-0000-F825-C4BDC89892A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ffg_7u5h_bjru"><intent_id>722683</intent_id><project_id>709938</project_id><text_data>truck rental only.  Project is rconstruction/re-configuration of 120th NE, Bellevue</text_data><comment_date>2015-09-24T00:00:00</comment_date></row><row _id="row-zhg3_yati.8f3g" _uuid="00000000-0000-0000-604F-828B4713572A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhg3_yati.8f3g"><intent_id>1118933</intent_id><project_id>913832</project_id><text_data>We are working 4 10's on this job.</text_data><comment_date>2021-02-01T00:00:00</comment_date></row><row _id="row-inyv.t7gv~tcrx" _uuid="00000000-0000-0000-68F6-60385A4CF2B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inyv.t7gv~tcrx"><intent_id>846531</intent_id><project_id>824231</project_id><text_data>Lake Tapps Parkway PreservationProject No: CP 1523, Fed Aid # STPUL-3290(012)City of Auburn Contract #: 17-05ICON JOB # 517310</text_data><comment_date>2017-07-11T00:00:00</comment_date></row><row _id="row-skkv.nxun_hg42" _uuid="00000000-0000-0000-0F1D-1776B59362CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-skkv.nxun_hg42"><intent_id>626433</intent_id><project_id>730251</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-04-28T00:00:00</comment_date></row><row _id="row-jerh_9hy9.iqxa" _uuid="00000000-0000-0000-1D29-3E4997B3BB30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jerh_9hy9.iqxa"><intent_id>1469201</intent_id><project_id>1025228</project_id><text_data>VE#50039</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-z3d6~ks39_uvuq" _uuid="00000000-0000-0000-8A01-83E824FD8435" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3d6~ks39_uvuq"><intent_id>1469519</intent_id><project_id>1146543</project_id><text_data>Plug scupper and flood roof, locate leaks, remove scupper and siding, repair drywall, siding and scupper. Roofing by other (OSD sub, not acssociated with Otter GC contract)</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-nj6x-waye.x4x9" _uuid="00000000-0000-0000-896B-1D1B2B16A46A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nj6x-waye.x4x9"><intent_id>1455529</intent_id><project_id>1139327</project_id><text_data>Operator Tasks:  Operate MCV cleaning machine (on Bobcat Toolcat Chassis), Perform offload of wastewater to approved disposal vehicle, Use mobile cleaning attachments to clean small obstructed areas, transport MCV cleaning vehicle to and from job-sites with truck and trailer.</text_data><comment_date>2024-09-03T00:00:00</comment_date></row><row _id="row-m7zs~6ucj_fghh" _uuid="00000000-0000-0000-EC7C-53FAB2F6C73E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7zs~6ucj_fghh"><intent_id>1467756</intent_id><project_id>1145628</project_id><text_data>Installation of Access Control System will be performed on exterior doors in the Public Health Bldg.</text_data><comment_date>2024-09-18T00:00:00</comment_date></row><row _id="row-5zgt.g8v6~qgjc" _uuid="00000000-0000-0000-3C99-39A860FBD6C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5zgt.g8v6~qgjc"><intent_id>1460513</intent_id><project_id>1141346</project_id><text_data>Correction to the intent 1460513 Our company only provided work for inspection and service including recharge of typical ABC fire extinguishers not associated with sprinkler systems.</text_data><comment_date>2024-10-04T00:00:00</comment_date></row><row _id="row-xstc.vpsw~5p5i" _uuid="00000000-0000-0000-DA59-79BFAF472326" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xstc.vpsw~5p5i"><intent_id>1470523</intent_id><project_id>1128402</project_id><text_data>Job# 2024-06</text_data><comment_date>2024-09-26T00:00:00</comment_date></row><row _id="row-u3ts_63wj.xu96" _uuid="00000000-0000-0000-6CAF-C828E8486980" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u3ts_63wj.xu96"><intent_id>1457959</intent_id><project_id>1120260</project_id><text_data>We cleaned the entire job site after Halme Builders was finished with their part. We drove our work vans, and provided all of the equipment and supplies needed to do the job.</text_data><comment_date>2024-10-03T00:00:00</comment_date></row><row _id="row-nczh~tbq2-ggqy" _uuid="00000000-0000-0000-8112-041B9D059CD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nczh~tbq2-ggqy"><intent_id>670126</intent_id><project_id>746289</project_id><text_data>Form filed by: L. Rachael CoeDepartment of Labor &amp; IndustriesPrevailing Wage ProgramP.O. Box 44835, Olympia, Wa 98504-4835Re: Saltwater State Park Bridge Seismic Retrofit, RCNW, Contract #TA-5091Please find enclosed our Intent to Pay Prevailing Wages exemption request for the City of Des Moines � Saltwater State Park Bridge project referenced above, along with the $40 filing fee.Please see our answers below to the following standard questions reviewed when requesting an exemption for surveying services when providing underground locates using Ground-Penetrating Radar (GPR) at prevailing-wage projects:1.	What is the purpose of this project? To provide underground locates using ground-penetrating radar (GPR) imaging services.2.	Does this project entail the remodeling or new construction of a facility? No, we only provided information of underground locates for customers.3.	Does your firm work up on a type of building system, what type of system was involved?No, we only provide underground locates.4.	What specific tasks do your employees perform? Our GPR technicians provide underground locates using GPR equipment that can view subsurface items.5.	What, if any, tools do your employees use in the performance of those tasks? GPR Equipment: SIR 3000 Unit (manufactured by Geophysical Survey Systems, Inc.)6.	If your employees use no tools, do they engage in any other type of manual, hands-on efforts in completing their tasks? No, our GPR technicians only use GPR equipment to provide information concerning underground locates.7.	Are you going to be hiring any subcontractors for this project? No, we will not use any subcontractors on this project.If you have any questions, please contact me at Rachael@SRImaging.com or 425-445-7675.Thank you for your assistance!Rachael Coe /  Financial Manager</text_data><comment_date>2014-12-16T00:00:00</comment_date></row><row _id="row-jzbz~cyem.2s2v" _uuid="00000000-0000-0000-97D6-A9112851878D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzbz~cyem.2s2v"><intent_id>836272</intent_id><project_id>822636</project_id><text_data>PC6 - Job #62242017 Annual Contract w/possible extensionContract #040-17CE</text_data><comment_date>2017-05-25T00:00:00</comment_date></row><row _id="row-hkpq~qhu9.43p3" _uuid="00000000-0000-0000-4266-374A7E983D9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hkpq~qhu9.43p3"><intent_id>613500</intent_id><project_id>727954</project_id><text_data>Wheelabrator Spokane, Inc is the actual prime contractor</text_data><comment_date>2014-01-23T00:00:00</comment_date></row><row _id="row-xxiq.hu3c.zmyh" _uuid="00000000-0000-0000-B170-214D5AA9F67E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xxiq.hu3c.zmyh"><intent_id>1266408</intent_id><project_id>1018387</project_id><text_data>'Other Trucks' = Lowbed, used for mobilization of equipment (Teamsters Union)'General Laborer's = hand shovel rock and asphalt (Laborer's Union)</text_data><comment_date>2022-10-04T00:00:00</comment_date></row><row _id="row-53ye.5aha.7f25" _uuid="00000000-0000-0000-C968-C0672A148C94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-53ye.5aha.7f25"><intent_id>806427</intent_id><project_id>809029</project_id><text_data>Install Medium Bark into landscape beds.</text_data><comment_date>2016-12-09T00:00:00</comment_date></row><row _id="row-mbwy_jpaz_kem8" _uuid="00000000-0000-0000-23AF-18314139685A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbwy_jpaz_kem8"><intent_id>1367731</intent_id><project_id>1089496</project_id><text_data>Invoice 583983</text_data><comment_date>2023-09-28T00:00:00</comment_date></row><row _id="row-n29j_2mvr~xt5q" _uuid="00000000-0000-0000-0783-990B8E6EF92F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n29j_2mvr~xt5q"><intent_id>651141</intent_id><project_id>738394</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Replace existing light fixtures with new, wire new HVAC system.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment.#3 - Including any basement or garage, how many stories or levels does the structure have? 1 � 2 levels.#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No(b) Any retail use in the structure? No(c) Permanent  residence only? Rental(d) Rehabilitation house? No(e) Transitional housing? No(f) Communal dining facility? No(g) Treatment services? No(h) Dormitories? No(i) Counseling? (j) Is each room and/or bed in the structure rented separately? No(k) Other? Residential property#5 - Does each dwelling unit have its own self-contained kitchen? Yes#6 - Does each dwelling unit have its own bathroom? Yes#7 - Is there a community facility or manager�s office on site? No#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2014-08-28T00:00:00</comment_date></row><row _id="row-y9sx_2e94.vtyx" _uuid="00000000-0000-0000-F060-0A95AB813428" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y9sx_2e94.vtyx"><intent_id>668168</intent_id><project_id>749957</project_id><text_data>Manufactured home within the City of Ellensburg#1 - Install Floor Insulation #2 - Single family manufactured home #3 - 1 level #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2014-12-03T00:00:00</comment_date></row><row _id="row-2tas-ijrm~4a4a" _uuid="00000000-0000-0000-9E98-12AA5D9E959F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tas-ijrm~4a4a"><intent_id>646241</intent_id><project_id>741206</project_id><text_data>Several manufactured homes within the City of Spokane		#1 - Heating duct sealing. #2 - Single family manufactured home? #3 - 1 level? #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2014-08-06T00:00:00</comment_date></row><row _id="row-apz3_2jp6~93ge" _uuid="00000000-0000-0000-ADBA-652C4A9C345E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-apz3_2jp6~93ge"><intent_id>824493</intent_id><project_id>791628</project_id><text_data>Williams Scotsman Inc is filing on behalf of J Tatman Const Services Inc due to ceased operations.</text_data><comment_date>2017-04-04T00:00:00</comment_date></row><row _id="row-3ds6_5wat~u2zs" _uuid="00000000-0000-0000-ADD7-F77282F755B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ds6_5wat~u2zs"><intent_id>530484</intent_id><project_id>693709</project_id><text_data>Temporary irrigation system will be installed approx. 12&amp;quot; deep.  Landscaping includes installation of plants, 2&amp;quot; of bark mulch and 4&amp;quot; of topsoil.</text_data><comment_date>2012-09-06T00:00:00</comment_date></row><row _id="row-nw4p.3nde~6rei" _uuid="00000000-0000-0000-09CC-5E0AC8E19FD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nw4p.3nde~6rei"><intent_id>939088</intent_id><project_id>863753</project_id><text_data>The truck to be used will be a Ford F350, double cabbed pick up truck.  No trailer will be used.  Single axle.</text_data><comment_date>2018-10-22T00:00:00</comment_date></row><row _id="row-i3zg~7au5.wimv" _uuid="00000000-0000-0000-125A-34E1C5CCD343" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i3zg~7au5.wimv"><intent_id>1318042</intent_id><project_id>1062405</project_id><text_data>9916149</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-mkb4~7p6g-8y8r" _uuid="00000000-0000-0000-37A0-DB56D0B25F90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mkb4~7p6g-8y8r"><intent_id>938084</intent_id><project_id>863372</project_id><text_data>1. Install windows and trim, install plywood to crawl access. #2. single family dwelling. #3. one story. #4. a. no b. no c. yes d. no e. no f. no. g. no h. no i. no j. no k. no #5. yes #6. yes #7. no #8. no</text_data><comment_date>2018-10-05T00:00:00</comment_date></row><row _id="row-299q-zj83-gi8p" _uuid="00000000-0000-0000-362A-E2B6C24C2EE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-299q-zj83-gi8p"><intent_id>845727</intent_id><project_id>826430</project_id><text_data>Laborer will help dig ditch and perform surface restoration too existing bathroom facility (Ie. shoveling and raking)</text_data><comment_date>2017-07-07T00:00:00</comment_date></row><row _id="row-itvp~qxh3.r3jc" _uuid="00000000-0000-0000-1140-F1B75360BF59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-itvp~qxh3.r3jc"><intent_id>599934</intent_id><project_id>722211</project_id><text_data>N/A</text_data><comment_date>2013-10-17T00:00:00</comment_date></row><row _id="row-zuvg~pp5a~tink" _uuid="00000000-0000-0000-F473-BADFEA391329" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zuvg~pp5a~tink"><intent_id>671604</intent_id><project_id>751609</project_id><text_data>Prime Job# 5146075 - fiber splicing.</text_data><comment_date>2014-12-30T00:00:00</comment_date></row><row _id="row-brw4~gpmt-sb8b" _uuid="00000000-0000-0000-54AD-E91E6CA4BD75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brw4~gpmt-sb8b"><intent_id>908824</intent_id><project_id>852442</project_id><text_data>Employees drive either a 2500 or a 3500 Chevy Silverado to and from the job site. Replaced block heater.</text_data><comment_date>2018-06-04T00:00:00</comment_date></row><row _id="row-anqt.in5u~4xz2" _uuid="00000000-0000-0000-12DA-22FD64EC25AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-anqt.in5u~4xz2"><intent_id>570298</intent_id><project_id>666716</project_id><text_data>Allied Safe &amp; Vault if filing on behalf of Aaro Inc., dba The Lock Shop due to failure to file.</text_data><comment_date>2013-06-13T00:00:00</comment_date></row><row _id="row-fy6p-8eux_mb2f" _uuid="00000000-0000-0000-7602-95229E1B9291" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fy6p-8eux_mb2f"><intent_id>600542</intent_id><project_id>715815</project_id><text_data>BRIAR GROUP INC WILL BE PROVIDING HYDROSEEDING ONLY ON THIS PROJECT.</text_data><comment_date>2013-10-21T00:00:00</comment_date></row><row _id="row-nhyg~m4xu_cfs6" _uuid="00000000-0000-0000-1181-C9BEEC8DF7C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nhyg~m4xu_cfs6"><intent_id>915582</intent_id><project_id>854990</project_id><text_data>Job #115305-001</text_data><comment_date>2018-07-03T00:00:00</comment_date></row><row _id="row-rzhs.gp66_mzqx" _uuid="00000000-0000-0000-CB7A-981FFF0C109A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzhs.gp66_mzqx"><intent_id>788511</intent_id><project_id>794680</project_id><text_data>Owner/Operator will perform dump trucking for this project.</text_data><comment_date>2016-09-11T00:00:00</comment_date></row><row _id="row-igxk.pd9u~k8f8" _uuid="00000000-0000-0000-7E0F-6403A26EE03C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-igxk.pd9u~k8f8"><intent_id>949674</intent_id><project_id>868198</project_id><text_data>repair and inspect gas furnace.</text_data><comment_date>2018-12-07T00:00:00</comment_date></row><row _id="row-k7fw_v7na.yuyk" _uuid="00000000-0000-0000-8E7A-564F3B0CDC56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7fw_v7na.yuyk"><intent_id>645374</intent_id><project_id>706602</project_id><text_data>PERSONAL		ANCIL+	VAC	TIME	HOL	PEN 	HEALTHTOTAL	PER HR	PER HR	PER HR	PER HR	PER HR$13.97	$0.79	$0.20	$0.71	$0.88	$11.39$14.18	$0.85	$0.22	$0.77	$0.95	$11.39</text_data><comment_date>2014-08-04T00:00:00</comment_date></row><row _id="row-bbhr.28mq~4ftt" _uuid="00000000-0000-0000-5086-E1D3D1777A7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bbhr.28mq~4ftt"><intent_id>841187</intent_id><project_id>824636</project_id><text_data>Filed by Craig Pretty.</text_data><comment_date>2017-06-16T00:00:00</comment_date></row><row _id="row-ky4g_ts8s~zru5" _uuid="00000000-0000-0000-2270-72227D61D9F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ky4g_ts8s~zru5"><intent_id>756945</intent_id><project_id>789702</project_id><text_data>Water main broke at the middle school, needs dryout</text_data><comment_date>2016-04-15T00:00:00</comment_date></row><row _id="row-p7f5~6s5e.h5rg" _uuid="00000000-0000-0000-89D3-FDE89CCBE0D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7f5~6s5e.h5rg"><intent_id>754465</intent_id><project_id>788434</project_id><text_data>046051</text_data><comment_date>2016-04-01T00:00:00</comment_date></row><row _id="row-sn5w~rv8f-csbd" _uuid="00000000-0000-0000-4ADF-60F01BFD5B5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sn5w~rv8f-csbd"><intent_id>653753</intent_id><project_id>744078</project_id><text_data>employees Adam Terhune</text_data><comment_date>2014-09-10T00:00:00</comment_date></row><row _id="row-iybd.9xu9_bhhm" _uuid="00000000-0000-0000-FC8C-5BBA1B1CCD2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iybd.9xu9_bhhm"><intent_id>1318051</intent_id><project_id>1058475</project_id><text_data>General Installation tools used by our technicians: cordless drill, multi screwdriver, ball pin hammer, small floor jack, silicone gun, floor dollies, channel locks, Sawzall, pry bar</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-9rs5.s3x6_gsck" _uuid="00000000-0000-0000-8D74-D91B0EA10040" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9rs5.s3x6_gsck"><intent_id>818860</intent_id><project_id>787647</project_id><text_data>D) General Laborers will not be permitted to handle material, clean up or assist trades such as Ironworkers and Plasterers. In the event that a General Laborer mistakenly assists one of these trades the appropriate journeyman rate will be paid.</text_data><comment_date>2017-03-14T00:00:00</comment_date></row><row _id="row-zq6s~gqsa_ep5h" _uuid="00000000-0000-0000-C54D-CA8474D04E6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zq6s~gqsa_ep5h"><intent_id>1220113</intent_id><project_id>1005083</project_id><text_data>The entire scope of this project is to repair a pre-existing park bench shade area, where the shade cloth suspended over the park benches had ripped. CLCI's role in this project is to complete the entire scope of work, ordering and installing pre-manufactured shade cloth identical to the equipment already in place. The Park &amp; Playground workers are responsible for installing the shade cloth, following manufacturer directions, using basic hand tools - pliers, ratchet, wrench, screwdrivers, etc. This involves removing the hardware suspending the damaged shade cloth, pulling that cloth down, foisting the replacement shade cloth into place and installing hardware to hold it. No vehicles or powered equipment of any kind is involved in this process.</text_data><comment_date>2022-04-13T00:00:00</comment_date></row><row _id="row-i6hw_wgcp-c85i" _uuid="00000000-0000-0000-2C1B-BE23ACB4E7EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i6hw_wgcp-c85i"><intent_id>1119370</intent_id><project_id>934613</project_id><text_data>RCE was just informed that this one-day job was actually a prevailing wage job - this is the reason for this late filing.</text_data><comment_date>2021-02-02T00:00:00</comment_date></row><row _id="row-dtte-63c5~ia3g" _uuid="00000000-0000-0000-59DE-D0CFF0DB3598" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dtte-63c5~ia3g"><intent_id>985494</intent_id><project_id>884627</project_id><text_data>All Snohomish County sub-stations.</text_data><comment_date>2019-06-18T00:00:00</comment_date></row><row _id="row-iys3-uhnr-7ixs" _uuid="00000000-0000-0000-AE0C-AB659924FFB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iys3-uhnr-7ixs"><intent_id>885460</intent_id><project_id>842395</project_id><text_data>1 Year Eaton UPS and Battery Service Contract for SN:  EH502UXX14Service Contract includes: FL87NXXX-0225  Flex: 8 Hr Rsp, 7x24 Cvg Only0005NXXX-0225  UPS Preventive Maintenance, After Hours (7x24)0005NS036  Sealed Battery Preventive Maintenance, Any Time</text_data><comment_date>2018-01-26T00:00:00</comment_date></row><row _id="row-7jyj-addc~eqhs" _uuid="00000000-0000-0000-D421-ABDB77D5F72B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7jyj-addc~eqhs"><intent_id>1125839</intent_id><project_id>936028</project_id><comment_date>2021-03-02T00:00:00</comment_date></row><row _id="row-9n9r_v5zb~hr7k" _uuid="00000000-0000-0000-873C-BE8C83450FEE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9n9r_v5zb~hr7k"><intent_id>828651</intent_id><project_id>815719</project_id><text_data>Installing irrigation system, topsoil, planting and wood chip mulch. All work will be done with hand tool. Any heavy machinery or truck driving will be done by owner/operator.</text_data><comment_date>2017-04-25T00:00:00</comment_date></row><row _id="row-7ses-dfeh.ui94" _uuid="00000000-0000-0000-BF25-EB82CFBCAF98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ses-dfeh.ui94"><intent_id>1130127</intent_id><project_id>955020</project_id><text_data>Customer 25837/Contract 222769/1/2020 thru 8/31/2021</text_data><comment_date>2021-03-19T00:00:00</comment_date></row><row _id="row-8rff_tq9p-8x7d" _uuid="00000000-0000-0000-BD7C-CA1BA5555884" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8rff_tq9p-8x7d"><intent_id>640595</intent_id><project_id>670294</project_id><text_data>Filed by Michelle Chase.</text_data><comment_date>2014-07-11T00:00:00</comment_date></row><row _id="row-wetk~rw8z_2u5s" _uuid="00000000-0000-0000-03D8-A3DEF4B21EE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wetk~rw8z_2u5s"><intent_id>535810</intent_id><project_id>649039</project_id><text_data>OMA will be installing drain pipe on this project.  Operators, general laborers will be used.  the project is the tunnel replacing the alaska way viaduct</text_data><comment_date>2012-09-21T00:00:00</comment_date></row><row _id="row-fv98_7q2i.kqfq" _uuid="00000000-0000-0000-2577-4602AB36AA72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fv98_7q2i.kqfq"><intent_id>767544</intent_id><project_id>734333</project_id><text_data>This intent replaces intent 677870.</text_data><comment_date>2016-06-10T00:00:00</comment_date></row><row _id="row-7f9m-x6mb~hmgf" _uuid="00000000-0000-0000-460B-A869108C1F9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7f9m-x6mb~hmgf"><intent_id>824750</intent_id><project_id>805626</project_id><text_data>Filed by Peter Blais</text_data><comment_date>2017-04-28T00:00:00</comment_date></row><row _id="row-zgaw.jax9.76n3" _uuid="00000000-0000-0000-2788-36C387CC2ED2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zgaw.jax9.76n3"><intent_id>1318063</intent_id><project_id>1062416</project_id><text_data>9915316</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-zuy3-d4st.3j4y" _uuid="00000000-0000-0000-C8F8-49D71D24E2EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zuy3-d4st.3j4y"><intent_id>487891</intent_id><project_id>627512</project_id><text_data>Journeyman Plumbers &amp; Pipefitter Fringe benefits: Health &amp; Welfare $8.16 - Vacation $5.50 - WA State Pension $4.56 - Supplemental Pension $3.25 - National Pension Fund 3.23 - JATC - $1.38 - Assessment Check Off $1.05 - Industry Improvement Trust $0.43 - International Training Fund $0.10 - MCAWW Dues $0.10</text_data><comment_date>2011-11-10T00:00:00</comment_date></row><row _id="row-u98t.ezrf_bqdf" _uuid="00000000-0000-0000-F573-19524141A0CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u98t.ezrf_bqdf"><intent_id>1126432</intent_id><project_id>943097</project_id><text_data>Concrete ready mix deliveries</text_data><comment_date>2021-03-04T00:00:00</comment_date></row><row _id="row-8nw9-k4rc-jt5z" _uuid="00000000-0000-0000-EA7F-353663A01468" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8nw9-k4rc-jt5z"><intent_id>741623</intent_id><project_id>782693</project_id><text_data>Fixed per correction notice on 1/15/16.</text_data><comment_date>2016-01-15T00:00:00</comment_date></row><row _id="row-g9ps-vaw5_5ehi" _uuid="00000000-0000-0000-D2E2-4F455C752607" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g9ps-vaw5_5ehi"><intent_id>1252737</intent_id><project_id>1001608</project_id><text_data>PCI Scaffolding 404 (22-08952); Apollo Mechanical</text_data><comment_date>2022-07-27T00:00:00</comment_date></row><row _id="row-r9bx-rbk7~th8q" _uuid="00000000-0000-0000-5FE2-6DC74D6B309F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9bx-rbk7~th8q"><intent_id>1105551</intent_id><project_id>928256</project_id><text_data>2200084 - Ridgefield Library First part of Job is with Insulation Contractors intent number 1081402, Insulation Contractors was acquired by Insulation Contractors of WA on 10.12.2020.</text_data><comment_date>2020-11-24T00:00:00</comment_date></row><row _id="row-5cvf-4ubj_4fd7" _uuid="00000000-0000-0000-F2C5-062C4261C5CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5cvf-4ubj_4fd7"><intent_id>868984</intent_id><project_id>835081</project_id><text_data>WORK PERFORMED BY THE TELECOMMUNICATION TECHNICIANS IS INSTALLING TELECOMMUNICATIONS CABLING CATEGORY 6 FOR VOICE (TELEPHONE) AND DATA (COMPUTER NETWORKING) INDOORS.</text_data><comment_date>2017-10-13T00:00:00</comment_date></row><row _id="row-9i3i.wkap~rkrm" _uuid="00000000-0000-0000-2277-397420ABA1D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9i3i.wkap~rkrm"><intent_id>1291478</intent_id><project_id>1027134</project_id><text_data>1220100 - East Pierce Fire &amp; Rescue FS 11</text_data><comment_date>2022-12-21T00:00:00</comment_date></row><row _id="row-8zch_9ges_uuka" _uuid="00000000-0000-0000-F74D-A90294D37D81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zch_9ges_uuka"><intent_id>1208185</intent_id><project_id>997526</project_id><text_data>We resurface tennis courts with a plexipave epoxy and make sure that the grade of the concrete/asphalt is safe. We use squeegee tools, buckets and brooms.</text_data><comment_date>2022-01-31T00:00:00</comment_date></row><row _id="row-qmpc_vx6g_dxsx" _uuid="00000000-0000-0000-79E1-EE5BD00A93E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qmpc_vx6g_dxsx"><intent_id>766137</intent_id><project_id>793616</project_id><text_data>Filed by Steven Conrad</text_data><comment_date>2016-06-03T00:00:00</comment_date></row><row _id="row-q398.8y33-tkbs" _uuid="00000000-0000-0000-7CBE-663455BF5EBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q398.8y33-tkbs"><intent_id>708857</intent_id><project_id>763318</project_id><text_data>Health = $6.15; Pension = $4.35; Training = $0.35</text_data><comment_date>2015-07-21T00:00:00</comment_date></row><row _id="row-srdc~crea-3enm" _uuid="00000000-0000-0000-BEFA-A5D324666E91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-srdc~crea-3enm"><intent_id>1079912</intent_id><project_id>921049</project_id><comment_date>2020-08-12T00:00:00</comment_date></row><row _id="row-f8t5_umr6~vqst" _uuid="00000000-0000-0000-7E5D-6F4E1FD76BD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f8t5_umr6~vqst"><intent_id>1180993</intent_id><project_id>969057</project_id><text_data>Job #Sedro Woolley Truck Driver 'Other' used for truck mounted pick up sweeper and/or 2000-4000 gallon water truck</text_data><comment_date>2021-09-27T00:00:00</comment_date></row><row _id="row-ekcx-e8xn_vizn" _uuid="00000000-0000-0000-E2C1-0B90F5AC6E3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ekcx-e8xn_vizn"><intent_id>1108008</intent_id><project_id>934987</project_id><text_data>VE 16676</text_data><comment_date>2020-12-07T00:00:00</comment_date></row><row _id="row-7qps.fvwi_8zih" _uuid="00000000-0000-0000-D67F-47CC390FF938" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7qps.fvwi_8zih"><intent_id>611055</intent_id><project_id>685290</project_id><text_data>Wetland enhancement plantings, rain garden plantings, perimeter plantings, perimeter topsoil, bark and mulch placement, and irrigation.</text_data><comment_date>2014-01-21T00:00:00</comment_date></row><row _id="row-5kmy~ttdn.az86" _uuid="00000000-0000-0000-ECCC-8EA1F2F96751" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5kmy~ttdn.az86"><intent_id>1171337</intent_id><project_id>938638</project_id><text_data>Job 176</text_data><comment_date>2021-08-23T00:00:00</comment_date></row><row _id="row-jqyc.w9ta_w8b3" _uuid="00000000-0000-0000-9162-4148FD6D7918" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jqyc.w9ta_w8b3"><intent_id>736630</intent_id><project_id>780298</project_id><text_data>Filed by Douglas Dorling</text_data><comment_date>2015-12-08T00:00:00</comment_date></row><row _id="row-rxtk-synv.p6su" _uuid="00000000-0000-0000-CDD8-84D30B36E3C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rxtk-synv.p6su"><intent_id>952742</intent_id><project_id>869620</project_id><text_data>Sole Proprietorship</text_data><comment_date>2018-12-31T00:00:00</comment_date></row><row _id="row-qtwj-aq6r-cvuv" _uuid="00000000-0000-0000-80E0-FC01F1115C3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qtwj-aq6r-cvuv"><intent_id>620926</intent_id><project_id>714915</project_id><text_data>Our company is not billing North Central/Boys &amp; Girls Club for our services.  We ARE paying our employees the appropriate prevailing wage rates for all their work on this project.</text_data><comment_date>2014-03-20T00:00:00</comment_date></row><row _id="row-zn23_8aj9_53g2" _uuid="00000000-0000-0000-8234-FA0B2E7AD5B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zn23_8aj9_53g2"><intent_id>1284226</intent_id><project_id>1041246</project_id><text_data>9876177</text_data><comment_date>2022-11-16T00:00:00</comment_date></row><row _id="row-fnx3.ent5-y7ws" _uuid="00000000-0000-0000-96EA-D7DE7BDBC48F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fnx3.ent5-y7ws"><intent_id>1248635</intent_id><project_id>1021448</project_id><text_data>WRS Job #C22-553PW8</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-x66u_2zgr~vqyn" _uuid="00000000-0000-0000-ABBE-7C26A3548371" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x66u_2zgr~vqyn"><intent_id>892002</intent_id><project_id>845442</project_id><text_data>#1-Repairing rotten wood on two decks. #2-Apartment. #3-2. #4-A No, - No, C-Yes, D-no, E-No, F-No, G-No, H-No, I-No, J-No, K-No, #5-Yes, #6-Yes, #7-Yes, #8-No.</text_data><comment_date>2018-03-09T00:00:00</comment_date></row><row _id="row-t6zb_dgfk_jaar" _uuid="00000000-0000-0000-FEFC-9396EF3FED4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t6zb_dgfk_jaar"><intent_id>727132</intent_id><project_id>774917</project_id><text_data>REMOVE WET AND MUDDY SPORTS UNIFORMS AND EQUIPMENT. PLACE DRYING EQUIPMENT. SPRAY MICROBATERIAL PRODUCT FOR MOLD.</text_data><comment_date>2015-10-26T00:00:00</comment_date></row><row _id="row-agh6~8ih2_e8ry" _uuid="00000000-0000-0000-53A7-9DD3E08F9991" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-agh6~8ih2_e8ry"><intent_id>1117705</intent_id><project_id>945232</project_id><text_data>0421012</text_data><comment_date>2021-01-26T00:00:00</comment_date></row><row _id="row-iujd-9hq3-ppi5" _uuid="00000000-0000-0000-883A-BE0C5A224200" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iujd-9hq3-ppi5"><intent_id>1137413</intent_id><project_id>957166</project_id><text_data>Davis Bacon - Yakima County Painter</text_data><comment_date>2021-04-21T00:00:00</comment_date></row><row _id="row-n962~egmw~2mce" _uuid="00000000-0000-0000-5B11-045AC3201FA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n962~egmw~2mce"><intent_id>991994</intent_id><project_id>887268</project_id><text_data>This project is part of a multi-year habitat improvement  of each of the three parks. Our role is just this year. We are using hand tools to remove invasive plants within the project boundaries, herbicide to reduce the impacts of ivy at Hollerbach as well as targeted herbicide applications on invasive woody plants, such as laurel and holly trees. Hand picks, small manual saws, backpack sprayers and machetes are the only tools that were utilized.</text_data><comment_date>2019-07-16T00:00:00</comment_date></row><row _id="row-5c6e.k77m.59hj" _uuid="00000000-0000-0000-7EEA-1BFE9921C357" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5c6e.k77m.59hj"><intent_id>903651</intent_id><project_id>849136</project_id><text_data>GENERAL LABOR WORK CONSISTS OF HAND WORK (SHOVEL WORK) NO POWER EQUIPMENT OR POWER TOOLS. PILOT CAR DRIVER IS USED FOR MOBILIZING HEAVY EQUIPMENT TO AND FROM THE PROJECT SITE. MOTOR PATROL GRADER IS USED FOR GRADING THE PROJECT SITE BEFORE PAVING OR CHIP SEALING OPERATIONS. OTHER TRUCKS CONSIST OF ONE (1) 0-8,000 GALLON WATER TRUCK USED FOR WATERING THE PROJECT SITE TO HELP WITH COMPACTION DURING THE GRADING PROCESS.</text_data><comment_date>2018-05-09T00:00:00</comment_date></row><row _id="row-d9s8-nw2j-njfv" _uuid="00000000-0000-0000-CEA1-F9BA1CA22439" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d9s8-nw2j-njfv"><intent_id>645502</intent_id><project_id>740923</project_id><text_data>Pulling telecommunication (voice/data) cabling between the IDF and station end inside the building.</text_data><comment_date>2014-08-04T00:00:00</comment_date></row><row _id="row-biiq~m8qn.2v5x" _uuid="00000000-0000-0000-04F2-24EDAF11EDFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-biiq~m8qn.2v5x"><intent_id>810396</intent_id><project_id>810855</project_id><text_data>WO #8020166</text_data><comment_date>2017-01-09T00:00:00</comment_date></row><row _id="row-2imv-5cp3.s3h8" _uuid="00000000-0000-0000-2BB5-84FE1A234166" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2imv-5cp3.s3h8"><intent_id>1042304</intent_id><project_id>849886</project_id><text_data>Final Cleaning used a mop and a broom. Windows cleaned 1 level squeegee extension pole vacuum duster 2 ft ladder.</text_data><comment_date>2020-03-03T00:00:00</comment_date></row><row _id="row-e62q~p2r8_qnzi" _uuid="00000000-0000-0000-E197-50821DADB2A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e62q~p2r8_qnzi"><intent_id>1140751</intent_id><project_id>960247</project_id><text_data>Service truck used to get to work site and carry any possible needed hand tools or parts</text_data><comment_date>2021-04-29T00:00:00</comment_date></row><row _id="row-qrab.iu6f.g9ub" _uuid="00000000-0000-0000-0700-72F3160059D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qrab.iu6f.g9ub"><intent_id>1318054</intent_id><project_id>1062414</project_id><text_data>9911177</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-7n66~hsjf.4hzb" _uuid="00000000-0000-0000-8ECC-3ECC8524B277" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7n66~hsjf.4hzb"><intent_id>1254451</intent_id><project_id>1024713</project_id><comment_date>2022-08-03T00:00:00</comment_date></row><row _id="row-drqa-jvdm-h455" _uuid="00000000-0000-0000-2708-DB817C2F59E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-drqa-jvdm-h455"><intent_id>654974</intent_id><project_id>744559</project_id><text_data>Several manufactured homes within the Lakeside Terrace MHP		#1 - Install Floor Insulation #2 - Single family manufactured home #3 - 1 level #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - Unknown #8 - No</text_data><comment_date>2014-09-16T00:00:00</comment_date></row><row _id="row-5f5r_5tiy_4pck" _uuid="00000000-0000-0000-1E25-4DB014CDDE1F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5f5r_5tiy_4pck"><intent_id>474272</intent_id><project_id>668111</project_id><text_data>Power Equipment Operator Motor Patrol Grader Finishing is wage band selected for our Vacuum Truck Operator.</text_data><comment_date>2011-08-24T00:00:00</comment_date></row><row _id="row-m2u9~eyqn.q96u" _uuid="00000000-0000-0000-FC86-9DEA997FD82E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2u9~eyqn.q96u"><intent_id>824852</intent_id><project_id>817423</project_id><text_data>Blairco Project 17-71281.Install ductless heat pump2.Single family3.One4.a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no l)no5.Yes6.Yes7.No8.No</text_data><comment_date>2017-04-05T00:00:00</comment_date></row><row _id="row-kv6p.cvkw-9pz9" _uuid="00000000-0000-0000-95CC-AF6128E85002" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kv6p.cvkw-9pz9"><intent_id>962047</intent_id><project_id>874072</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT. IT IS A SINGLE FAMILY RESIDENTIAL DWELLING.</text_data><comment_date>2019-02-25T00:00:00</comment_date></row><row _id="row-q3qj-z7gr~c9q7" _uuid="00000000-0000-0000-E921-2596F4DA64D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q3qj-z7gr~c9q7"><intent_id>496851</intent_id><project_id>679449</project_id><text_data>Fringe Breakdown:  $5.00 Medical, $1.00 vacation, $1.00 Holiday, remainder will go to pension</text_data><comment_date>2012-01-13T00:00:00</comment_date></row><row _id="row-xdhf_mfb2.it33" _uuid="00000000-0000-0000-61CC-AF693749DA1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdhf_mfb2.it33"><intent_id>777379</intent_id><project_id>797924</project_id><text_data>1.   Wheelchair ramp2.  Single Family 3. 24. a- no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no5. yes6. yes7. no8. no</text_data><comment_date>2016-07-25T00:00:00</comment_date></row><row _id="row-96kr.g27m_7mfi" _uuid="00000000-0000-0000-A404-9DECF798EB78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96kr.g27m_7mfi"><intent_id>757389</intent_id><project_id>789909</project_id><text_data>Other truck = 1 Ton flatbed used to haul ecoblocks to job site.</text_data><comment_date>2016-06-01T00:00:00</comment_date></row><row _id="row-feqf-rxgu~cz65" _uuid="00000000-0000-0000-9D47-09A400D77541" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-feqf-rxgu~cz65"><intent_id>591236</intent_id><project_id>714354</project_id><text_data>System Type:  LAN &amp; Wireless Access Points.  Telecom Tech (09) &amp; Electronic Tech (06)  to install a Structured Cable System.  Work will be performed indoors.</text_data><comment_date>2013-09-03T00:00:00</comment_date></row><row _id="row-53xd_f2ij_xt3f" _uuid="00000000-0000-0000-4CB9-871CBEFA8336" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-53xd_f2ij_xt3f"><intent_id>676236</intent_id><project_id>748720</project_id><text_data>Union Fringe Benefits Per HourAnnuity - $4.75Apprenticeship - $.65Health - $6.77IMPACT - $.29Pension - $9.95</text_data><comment_date>2015-01-24T00:00:00</comment_date></row><row _id="row-bdhm~iwv3_r9ns" _uuid="00000000-0000-0000-2C07-1A8DBE324CDA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bdhm~iwv3_r9ns"><intent_id>763603</intent_id><project_id>792594</project_id><text_data>Nordic Project # 16919</text_data><comment_date>2016-05-23T00:00:00</comment_date></row><row _id="row-vws7~uf8q_vxfv" _uuid="00000000-0000-0000-72A1-2221330B069E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vws7~uf8q_vxfv"><intent_id>593462</intent_id><project_id>719903</project_id><text_data>General Laborer duties may include minor demolition utilizing hand tools, material handling and general cleanup.</text_data><comment_date>2013-09-21T00:00:00</comment_date></row><row _id="row-iwzf~4v2b.ki9g" _uuid="00000000-0000-0000-64AF-74C106837203" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iwzf~4v2b.ki9g"><intent_id>544173</intent_id><project_id>699580</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Olympic General Contractors will act as the General Contractor on the Youth Haven Project. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Youth Haven is a 2 Story other residential structure-Residential Group R-3 Congrgate Living-Community Facility #3 - Including any basement or garage, how many stories or levels does the structure have? 2 stories #4 - What is the building used for? Residential Group R-3 Congregate Living-Transitional Housing for Youth  --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? YES (f) Communal dining facility? YES (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other?  #5 - Does each dwelling unit have its own self-contained kitchen? NO #6 - Does each dwelling unit have its own bathroom? NO #7 - Is there a community facility or manager�s office on site? YES #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2012-11-15T00:00:00</comment_date></row><row _id="row-k95r.3j73_v9fj" _uuid="00000000-0000-0000-9403-6E966BE5EE73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k95r.3j73_v9fj"><intent_id>1146340</intent_id><project_id>960067</project_id><text_data>l. What is the specific purpose of this awarding agency's public works project? We are performing a building enclosure test2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? NO3. Does this a civic project entail the remodeling or new construction of a facility? Remodel and new addition (all work is by other companies)4. If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc. No5. What specific tasks will your employees perform? Building Enclosure test per the Washington state Energy code Section 502.4.5 Building Air Leakage Testing6. What. If any tools will our employees use in the performance of those tasks? Orifice Blower Door Fans7. If your employees will use no tools, will the engage in any other type of manual, hands-on efforts in the completion of their tasks? No8. Are you going to be hiring any' subcontractors for this project? No</text_data><comment_date>2021-05-20T00:00:00</comment_date></row><row _id="row-gthf-d8bw_4gat" _uuid="00000000-0000-0000-CE42-037BEB139F15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gthf-d8bw_4gat"><intent_id>864771</intent_id><project_id>833367</project_id><text_data>Owner Operator/Casey Lenzi</text_data><comment_date>2017-09-24T00:00:00</comment_date></row><row _id="row-5ffs_yb5u-tijc" _uuid="00000000-0000-0000-9E98-4EB20843EC0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ffs_yb5u-tijc"><intent_id>622477</intent_id><project_id>718320</project_id><text_data>The union advised me on bid date to bid job per current prevailing wage rates in the county where the job is being performed in order to be able to compete competitively in the bid process. I am planning on paying full benefits per hour to union and the balance will be the hourly wage for employees.</text_data><comment_date>2014-04-02T00:00:00</comment_date></row><row _id="row-7q7e~de2b-gjgr" _uuid="00000000-0000-0000-F99A-A5624B5CF8CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7q7e~de2b-gjgr"><intent_id>928908</intent_id><project_id>853755</project_id><text_data>Sample Address:  117 W. 4th Ave. PeEll1 - electrical for weatherization2 - single family dwelling3 - one4 - a) no; b) no; c) yes; d) no; e) no; f) no; g) no; h) no; I) no; j) no; k) no; l) n/a5 - yes6 - yes7 - no8 - no</text_data><comment_date>2018-08-28T00:00:00</comment_date></row><row _id="row-ijnt.wsmh-bu87" _uuid="00000000-0000-0000-30F0-7D59F25DBFFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijnt.wsmh-bu87"><intent_id>1150484</intent_id><project_id>960658</project_id><text_data>corrected: Laborer fringe total $12.58 = $6.70 health &amp; welfare, $4.79 Pension, $0.95 training, $0.14 NWLECET</text_data><comment_date>2021-07-08T00:00:00</comment_date></row><row _id="row-k49c_7mx8_rr2d" _uuid="00000000-0000-0000-4160-9F5E96FB26B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k49c_7mx8_rr2d"><intent_id>825481</intent_id><project_id>815922</project_id><text_data>Whitman - 3 positions under same &amp;#39;occupation&amp;#39; label - 58.17/hour for Rotomill operator, 55.21/hour for rotomill groundsman, 55.21/hour for power broom</text_data><comment_date>2017-04-10T00:00:00</comment_date></row><row _id="row-rx2v-78bc~28ah" _uuid="00000000-0000-0000-C1A3-3F88D34D2D4E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rx2v-78bc~28ah"><intent_id>701635</intent_id><project_id>762999</project_id><text_data>job# 21955</text_data><comment_date>2015-06-18T00:00:00</comment_date></row><row _id="row-q5fh.5kmy-wjkd" _uuid="00000000-0000-0000-305B-C47B1568C382" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5fh.5kmy-wjkd"><intent_id>879032</intent_id><project_id>839319</project_id><text_data>Filed by Traci Clarke</text_data><comment_date>2017-12-13T00:00:00</comment_date></row><row _id="row-gfuk~g7y3~4shd" _uuid="00000000-0000-0000-E6DC-8D8B316526E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfuk~g7y3~4shd"><intent_id>987596</intent_id><project_id>814572</project_id><text_data>HIRED BY HARBOR PACIFIC CONTRACTORS</text_data><comment_date>2019-06-26T00:00:00</comment_date></row><row _id="row-rck4-shsm-cigd" _uuid="00000000-0000-0000-1476-A1B3890F5E21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rck4-shsm-cigd"><intent_id>1465858</intent_id><project_id>1144687</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Low Income weatherization#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single Family#3 - Including any basement or garage, how many stories or levels does the structure have? One Story#4 - What is the building used for? -- Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(i) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO(l) Other services or uses? NO#5 - Does each dwelling unit have its own self-contained kitchen? NO#6 - Does each dwelling unit have its own bathroom? NO#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-7hji_dmsg_se8q" _uuid="00000000-0000-0000-42BB-BE84A0D7ED45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7hji_dmsg_se8q"><intent_id>870919</intent_id><project_id>835832</project_id><text_data>Redo the entry sign at the East entry to the city on Hwy 202 (renovate the two welcoming monument signs)Monument sign 1, We will remove ground cover, shrubs and small diameter trees to allow for new installation of plants. We will install (4) 2 man and (3) 1 man boulders, and a dry river bed with 4-6&amp;quot; min. size cobble. Plants to be installed, (7) 2-3 gal evergreen azalea, (15) 5 gal red twig dogwood, (12) 1 gal oragne sedge, (36) 1 gal Stella de Ora daylilies, (5) 2-3 gal dwarf mugo pine, and (6) 1-1/2&amp;quot; cal. Quaken Aspen. Following planting, mulch will be applied to a minimum depth of 4 inches.Monument sign 2, We will remove an est. of 48 sq. ft. of lawn and amend the soil with 2 inches of compost. We will install (3) 2 man and (2) 1 man boulders and a dry river bed with 4-6&amp;quot; min. size cobble. Plants to be installed, (4) 2-3 gal evergreen azalea, (12) 1 gal Stella de Ora daylilies, (1) 2-3 gal dwarf mugo pine, (6) 1 gal Mexican feather grass, (4) 1 gal Spanish lavender, and (1) 7-8&amp;#39; Western hemlock. Following planting, mulch will be applied to a minimum depth of 4 inches. All generated debris by this scope of work will be removed and disposed of offsite.Boulders can be placed by hand and small saplings removed should only require hand loopers.</text_data><comment_date>2017-10-24T00:00:00</comment_date></row><row _id="row-y6fw~jk48_44jq" _uuid="00000000-0000-0000-C308-DAC3CBBCA4DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y6fw~jk48_44jq"><intent_id>850215</intent_id><project_id>828227</project_id><text_data>1) home modifications that are considered for Accessibility Needs (for disabled tenants). Grab bars, ramps, tub to shower conversions, ADA height toilets, etc. 2) each tenant lives in a different address. Single family houses, duplexes, apartments, condos, mobile homes. 3) varies depending on the home. 4) a. no  b. no  c. yes d. no e. no f. no g. no h. no i. no j. no k. no l. n/a  5) yes 6) yes 7) not in single family homes, manager office in apt bldgs. 8) no</text_data><comment_date>2017-07-26T00:00:00</comment_date></row><row _id="row-dm88_zmmq_fqr9" _uuid="00000000-0000-0000-22EB-9B9B63B9F24C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dm88_zmmq_fqr9"><intent_id>774194</intent_id><project_id>794034</project_id><text_data>This project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon Wage requirements for the following crafts/trades.</text_data><comment_date>2016-07-12T00:00:00</comment_date></row><row _id="row-mpi6-enqh-853m" _uuid="00000000-0000-0000-2890-E397AE7594B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpi6-enqh-853m"><intent_id>680146</intent_id><project_id>756006</project_id><text_data>We are &amp;quot;cleaning&amp;quot; tile floors using Mops, mop buckets, PH Neutral cleaner, Non-riding floor walk behind cylindrical floor scrubber. Laura Herman, Industrial Relation Specialist with Prevailing Program DL&amp;I, approved this classification for this quarterly maintenance work on an email to me on 6/18/14. I can provide copy of email if needed.thank you, Donna Reid Office Adminstrator, Pacific Modular, Inc.</text_data><comment_date>2015-02-24T00:00:00</comment_date></row><row _id="row-g7xk_vkjy_c2q5" _uuid="00000000-0000-0000-317E-9E7CEC992446" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g7xk_vkjy_c2q5"><intent_id>896084</intent_id><project_id>847246</project_id><text_data>Carrie Creamer is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be doing ceiling and floor repair as well as installing a new door. This job meets the residential job requirements.</text_data><comment_date>2018-04-02T00:00:00</comment_date></row><row _id="row-3u9c_imqe_ztgg" _uuid="00000000-0000-0000-C529-170171BBC989" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3u9c_imqe_ztgg"><intent_id>1155576</intent_id><project_id>917673</project_id><text_data>We are an Oregon business owner and we have our workers comp insurance with SAIF.</text_data><comment_date>2021-06-27T00:00:00</comment_date></row><row _id="row-vew5_ut7w.n7yt" _uuid="00000000-0000-0000-4DE3-2E85082A7553" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vew5_ut7w.n7yt"><intent_id>1162366</intent_id><project_id>971716</project_id><text_data>0921042</text_data><comment_date>2021-07-22T00:00:00</comment_date></row><row _id="row-ttzi-bt6z_wu7k" _uuid="00000000-0000-0000-D8FC-FA9AADBA181E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ttzi-bt6z_wu7k"><intent_id>1259171</intent_id><project_id>1021987</project_id><text_data>Public note added per customer request: Per Contractor Registration, RST no longer needs a contractor's license number for excavation because they are only on a dump truck rental basis from now on.</text_data><comment_date>2022-11-22T00:00:00</comment_date></row><row _id="row-pwcq.e93p_3sgc" _uuid="00000000-0000-0000-7BF6-AEA148339EC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pwcq.e93p_3sgc"><intent_id>1007983</intent_id><project_id>887341</project_id><text_data>This is a Short Form job for CPSD - Oakbrook Elementary only, to relocate one keypad.</text_data><comment_date>2019-09-18T00:00:00</comment_date></row><row _id="row-u57n.hdvg~a2ub" _uuid="00000000-0000-0000-B560-34F44AACA305" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u57n.hdvg~a2ub"><intent_id>857951</intent_id><project_id>828626</project_id><text_data>Miller Contracting Services Group, LLC will be hiring a subcontractor for all labor performed on this job.  We are not sure why this is not being approved.  Please specify in more detail where the problem exists.  Thank you</text_data><comment_date>2017-09-19T00:00:00</comment_date></row><row _id="row-z4a7.5wy7_pfrw" _uuid="00000000-0000-0000-B04C-27193E4098A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z4a7.5wy7_pfrw"><intent_id>919378</intent_id><project_id>856368</project_id><text_data>Lynda Lunderman is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing new bathroom fans and a new ductless heat pump. This job meets the residential job requirements.</text_data><comment_date>2018-07-19T00:00:00</comment_date></row><row _id="row-6rxn.nbs2-swyg" _uuid="00000000-0000-0000-B2D2-51D475A2DF50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6rxn.nbs2-swyg"><intent_id>585195</intent_id><project_id>714543</project_id><text_data>walsh construction ll</text_data><comment_date>2013-08-02T00:00:00</comment_date></row><row _id="row-uubs-25rr.ymx3" _uuid="00000000-0000-0000-D2F9-5C9836F91BE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uubs-25rr.ymx3"><intent_id>1194118</intent_id><project_id>988532</project_id><text_data>KG2532</text_data><comment_date>2021-11-18T00:00:00</comment_date></row><row _id="row-pu89~fwct-ytbz" _uuid="00000000-0000-0000-BDD7-91223C4B72F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pu89~fwct-ytbz"><intent_id>762000</intent_id><project_id>785480</project_id><text_data>jobs in olympia, bucoda,</text_data><comment_date>2016-05-13T00:00:00</comment_date></row><row _id="row-yggs_pevs~5qpt" _uuid="00000000-0000-0000-2B1F-D10736E788CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yggs_pevs~5qpt"><intent_id>860732</intent_id><project_id>827960</project_id><text_data>RON RHOADS IS AN OWNER/OPERATOR.FRINGE BENEFITS ARE PAID IN FULL DIRECTLY TO THE EMPLOYEE.</text_data><comment_date>2017-09-05T00:00:00</comment_date></row><row _id="row-svws.5w78_8c5w" _uuid="00000000-0000-0000-8C8B-F862A43E13E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-svws.5w78_8c5w"><intent_id>560535</intent_id><project_id>703121</project_id><text_data>The fringe benefit portion of the pay rate is paid in cash wages to the employee. No breakout of the components of the fringe rate was provided to Tradesmen International, Inc.</text_data><comment_date>2013-03-25T00:00:00</comment_date></row><row _id="row-rv2r~rbar_hiid" _uuid="00000000-0000-0000-E144-F697950D7C93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rv2r~rbar_hiid"><intent_id>487752</intent_id><project_id>674774</project_id><text_data>Job Address McClure-OIC 503 W 7th AveRitzville, WA  99169</text_data><comment_date>2011-11-06T00:00:00</comment_date></row><row _id="row-w9b8.rpzk_cutq" _uuid="00000000-0000-0000-8EF6-5463CCC79746" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9b8.rpzk_cutq"><intent_id>647201</intent_id><project_id>729244</project_id><text_data>Trucking services.</text_data><comment_date>2014-08-12T00:00:00</comment_date></row><row _id="row-axxh.nd3a_un4x" _uuid="00000000-0000-0000-1F2D-097485BD4E35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-axxh.nd3a_un4x"><intent_id>761915</intent_id><project_id>791906</project_id><text_data>Filed by Judy M. Bergin</text_data><comment_date>2016-05-12T00:00:00</comment_date></row><row _id="row-kv3c.ge6m-ng2z" _uuid="00000000-0000-0000-9CAF-74349ACD2BEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kv3c.ge6m-ng2z"><intent_id>671128</intent_id><project_id>744165</project_id><text_data>#1 - Describe the work that your firm was contracted to perform: Plumbing#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment#3 - Including any basement or garage, how many stories or levels does the structure have? 3#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No(b) Any retail use in the structure? NO(c) Permanent residence only? Yes(d) Rehabilitation house? No(e) Transitional housing? No(f) Communal dining facility? No(g) Treatment services? No(h) Dormitories? No(i) Counseling? No(j) Is each room and/or bed in the structure rented separately? No(k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? Yes#6 - Does each dwelling unit have its own bathroom? Yes#7 - Is there a community facility or manager�s office on site? Yes#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2014-12-23T00:00:00</comment_date></row><row _id="row-d633_5864_suxq" _uuid="00000000-0000-0000-B92A-B35F1F5A9316" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d633_5864_suxq"><intent_id>1239674</intent_id><project_id>1009231</project_id><text_data>Demolition, New Curb, Gutter, Sidewalk, Street Lighting, Traffic Lighting, Paving and Landscaping. We will be installing Sleeve 24' depth, main 18' depth, lateral 12' depth. Will be installing 67cy of swale bioretention soil mix, 90cy rock mulch 2'-4', sod 3,240 sq ft. and landscape filter fabric. Landscaping we will be installing trees, shrubs and will be using 18cy bark or wood chip mulch.</text_data><comment_date>2022-08-17T00:00:00</comment_date></row><row _id="row-i6hn-4d2e.hdem" _uuid="00000000-0000-0000-9051-4C359DE37165" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i6hn-4d2e.hdem"><intent_id>818991</intent_id><project_id>814794</project_id><text_data>Motor Patrol Grader to vacuum hole for new Pole</text_data><comment_date>2017-03-05T00:00:00</comment_date></row><row _id="row-jy6p.2zzx-iwwa" _uuid="00000000-0000-0000-A5E9-F7DE5E3D7FBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jy6p.2zzx-iwwa"><intent_id>849886</intent_id><project_id>827375</project_id><text_data>Industrial Insurance</text_data><comment_date>2017-08-01T00:00:00</comment_date></row><row _id="row-y3zs~eak7-dgnt" _uuid="00000000-0000-0000-B871-C25DF34FB25A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y3zs~eak7-dgnt"><intent_id>604959</intent_id><project_id>705744</project_id><text_data>LEI#267813</text_data><comment_date>2013-11-18T00:00:00</comment_date></row><row _id="row-2uh3_ttaz~qt74" _uuid="00000000-0000-0000-4EA7-AAC2FEBB784E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2uh3_ttaz~qt74"><intent_id>926923</intent_id><project_id>859205</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATON PROJECT. IT IS A SINGLE FAMILY RESIDENTIAL DWELLING.</text_data><comment_date>2018-08-20T00:00:00</comment_date></row><row _id="row-de2x~9dnm-hhw6" _uuid="00000000-0000-0000-9AD1-4793D2523907" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-de2x~9dnm-hhw6"><intent_id>620697</intent_id><project_id>731139</project_id><text_data>SimplexGrinnell (Our WA UBI#):602113334</text_data><comment_date>2014-03-18T00:00:00</comment_date></row><row _id="row-dkxz.aaxz.tr2p" _uuid="00000000-0000-0000-2DC0-3F64F960040C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dkxz.aaxz.tr2p"><intent_id>829379</intent_id><project_id>791213</project_id><text_data>LONG Job# 5050.160186</text_data><comment_date>2017-04-27T00:00:00</comment_date></row><row _id="row-npi3~hcwn_cbp7" _uuid="00000000-0000-0000-3896-746F0F0B9759" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-npi3~hcwn_cbp7"><intent_id>891966</intent_id><project_id>845423</project_id><text_data>GENERAL LABORERS USE HAND TOOLS SUCH AS SHOVELS AND RAKE AND DO MANUAL TASKS SUCH AS INSTALLING SILT FENCE AND HAY. OTHER TRUCKS INCLUDE LOWBOY AND/OR WATERTRUCKS.</text_data><comment_date>2018-03-08T00:00:00</comment_date></row><row _id="row-ajaj.g8hd.pguu" _uuid="00000000-0000-0000-69AD-AE3D3D846E9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ajaj.g8hd.pguu"><intent_id>1141536</intent_id><project_id>960676</project_id><text_data>Fringes: Vacation $5.50, Assessment $1.30, Insurance $9.01, Pension $12.36, Training $2.33, Industry Improvement $.50</text_data><comment_date>2021-05-03T00:00:00</comment_date></row><row _id="row-rbtn.wvk9_uakq" _uuid="00000000-0000-0000-20EF-931539CD5EE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rbtn.wvk9_uakq"><intent_id>1267798</intent_id><project_id>1019680</project_id><text_data>922181Castillo650 Hays RdOthello, WA 99344922197Garcia2181 W May StOthello, WA 99344922196Moreno152 S Barton RdOthello, WA 99344922193Silva780 S 4th AveOthello, WA 99344922194Trujillo2159 W April StOthello, WA 99344</text_data><comment_date>2022-09-19T00:00:00</comment_date></row><row _id="row-mbrg.k7gt_fcf4" _uuid="00000000-0000-0000-EEE5-C3FE0DB5B067" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbrg.k7gt_fcf4"><intent_id>672131</intent_id><project_id>730237</project_id><text_data>Filed by Seanna Trentman</text_data><comment_date>2015-01-05T00:00:00</comment_date></row><row _id="row-we3m~fbyy~pdsc" _uuid="00000000-0000-0000-9134-89484FF28376" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-we3m~fbyy~pdsc"><intent_id>668079</intent_id><project_id>689965</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirements</text_data><comment_date>2014-12-02T00:00:00</comment_date></row><row _id="row-gfqf_99jv_5zzh" _uuid="00000000-0000-0000-0E5B-CBC62E6E0EAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfqf_99jv_5zzh"><intent_id>1255656</intent_id><project_id>1015096</project_id><text_data>Contract #3119Project #922174Job # 220342</text_data><comment_date>2022-08-05T00:00:00</comment_date></row><row _id="row-gkx9.wjvi~wu2r" _uuid="00000000-0000-0000-C756-0403072A8266" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gkx9.wjvi~wu2r"><intent_id>704638</intent_id><project_id>765908</project_id><text_data>Form filed by:  Sierra McBride</text_data><comment_date>2015-07-01T00:00:00</comment_date></row><row _id="row-kh5y~b8xb-36zf" _uuid="00000000-0000-0000-1401-6C283D923B90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kh5y~b8xb-36zf"><intent_id>741524</intent_id><project_id>782651</project_id><text_data>WE WILL BE AERATING (PUNCHING HOLES). THESE PROCESSES HAVE BEEN APPROVED AS FALLING UNDER THE WA LANDSCAPING CODE. WE ARE IN OREGON, AND WE HAVE THE RECIPROCAL AGREEMENT WITH WASHINGTON FOR WORKERS COMP</text_data><comment_date>2016-01-13T00:00:00</comment_date></row><row _id="row-4jme.5r96.5qyd" _uuid="00000000-0000-0000-9D27-F7916E53884B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4jme.5r96.5qyd"><intent_id>1142413</intent_id><project_id>961134</project_id><text_data>Landscape maintenance - mow, blower, weed, mulch and pruning using hand tools</text_data><comment_date>2021-05-06T00:00:00</comment_date></row><row _id="row-jtca~qqi2.r89h" _uuid="00000000-0000-0000-07C6-A123DEC79CA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jtca~qqi2.r89h"><intent_id>972885</intent_id><project_id>879012</project_id><text_data>C&amp;R Tractor and Landscaping will provide landscape maintenance service to the district building and surrounding pump stations. We will be applying bark and raking leaves, mowing grass using push behind lawn mowers, trimming shrubs and trees using hand tools.</text_data><comment_date>2019-04-22T00:00:00</comment_date></row><row _id="row-usx6.kyvw~zgzi" _uuid="00000000-0000-0000-3509-ADCAF775947B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-usx6.kyvw~zgzi"><intent_id>1056812</intent_id><project_id>918342</project_id><text_data>All work will be performed by subcontractors, except for possible punch-list items and/or possible site clean-up.BCI project number GA4148Filed by Kathi Clark</text_data><comment_date>2020-05-08T00:00:00</comment_date></row><row _id="row-4kfm.xe9a.ha8e" _uuid="00000000-0000-0000-3B4B-6A44577961D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4kfm.xe9a.ha8e"><intent_id>1318036</intent_id><project_id>1062401</project_id><text_data>9915243</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-jujp.shie_skzz" _uuid="00000000-0000-0000-A344-1E0D903821D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jujp.shie_skzz"><intent_id>599936</intent_id><project_id>716881</project_id><text_data>Filed by Tim Krug</text_data><comment_date>2013-10-17T00:00:00</comment_date></row><row _id="row-du3x.s2u6_y3xk" _uuid="00000000-0000-0000-F7C1-43F9769A2C40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-du3x.s2u6_y3xk"><intent_id>1116063</intent_id><project_id>931643</project_id><text_data>Stoneway Concrete is a Supplier</text_data><comment_date>2021-01-19T00:00:00</comment_date></row><row _id="row-3wgz-rie4~htq4" _uuid="00000000-0000-0000-EFF6-1B332C6BE1C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3wgz-rie4~htq4"><intent_id>684927</intent_id><project_id>758107</project_id><text_data>Scope of work: Clean up site of organic debris, maintain landscape at site through 11/30/2015: weeding, pruning, rakingtools to be used on job: rakes, hand pruning tools, wheelbarrows, hand weeding tools</text_data><comment_date>2015-03-21T00:00:00</comment_date></row><row _id="row-h2pa-mgu5-sa32" _uuid="00000000-0000-0000-2B7E-0C3F44AA261F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2pa-mgu5-sa32"><intent_id>495353</intent_id><project_id>680710</project_id><text_data>1 - Contractor's Registration License was re-instated on 1/10/12.2 - A: This project consists of two sets of artificial turf fields at Skyline and Eastlake High Schools.    B: The tasks that are performed by the Brickman Group on these projects deal with the routing Landscape Maintenance of the properties. This includes the cleaning of the trash receptacles by removing and replacing the full bags, picking up of trash and debris from the fields, and brushing the fields as specified in the contract.</text_data><comment_date>2012-01-16T00:00:00</comment_date></row><row _id="row-hd8h-gtvw.43ca" _uuid="00000000-0000-0000-DC46-B60E24EC6D51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hd8h-gtvw.43ca"><intent_id>684704</intent_id><project_id>755710</project_id><text_data>Kon Hwang 205 Bayside Place Bellingham Wa 98225</text_data><comment_date>2015-03-19T00:00:00</comment_date></row><row _id="row-prya-wj5x-yjen" _uuid="00000000-0000-0000-2D02-EC5AEAE3BB88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prya-wj5x-yjen"><intent_id>1279160</intent_id><project_id>1027329</project_id><text_data>Job 153400</text_data><comment_date>2022-11-01T00:00:00</comment_date></row><row _id="row-9rfz_4uih.iete" _uuid="00000000-0000-0000-1005-88520CD2CE54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9rfz_4uih.iete"><intent_id>996895</intent_id><project_id>885892</project_id><text_data>We have been hired by Emerick Construction Company to complete both the baseball field at Haydu Park help with Kalama Elementary SchoolHaydu Park: The only part of the park we have been hired to do is the baseball field which will include putting in an irrigation system, installation of soil, and seeding.Kalama Elementary School: Basic landscape and irrigation</text_data><comment_date>2019-08-05T00:00:00</comment_date></row><row _id="row-8biq_2wjc-8yyt" _uuid="00000000-0000-0000-C865-DC0B9B40EB43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8biq_2wjc-8yyt"><intent_id>886979</intent_id><project_id>839969</project_id><text_data>Filed by T Niccole Riverson</text_data><comment_date>2018-02-06T00:00:00</comment_date></row><row _id="row-kqip.ze36.thi2" _uuid="00000000-0000-0000-1AE8-3F1A13418ECE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kqip.ze36.thi2"><intent_id>1196784</intent_id><project_id>985262</project_id><text_data>Subcontract 10198Project 921450Job 210559WO 22971) Install Mitsubishi 12K DHP on back garage2) Yes3) N/A4) Residential Usea) Nob) Noc) Yesd) Noe) Nof) Nog) Noh) Noi) Noj) Nok) Nol) N/A5) Yes6) Yes7) N/A8) No</text_data><comment_date>2021-12-02T00:00:00</comment_date></row><row _id="row-ppru~fhpv-un8v" _uuid="00000000-0000-0000-1F52-59EEDFD46608" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ppru~fhpv-un8v"><intent_id>515516</intent_id><project_id>678959</project_id><text_data>This form is being approved on the basis of your statement that your employees performed no tasks which required the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.</text_data><comment_date>2012-06-13T00:00:00</comment_date></row><row _id="row-s6j8.emn9~cswu" _uuid="00000000-0000-0000-75C7-523A358F2688" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s6j8.emn9~cswu"><intent_id>625123</intent_id><project_id>726601</project_id><text_data>Installation of trees, Shrubs, &amp; Groundcover,4&amp;quot; Topsoil type A , 2&amp;quot; Bark, &amp; Raingarden soil. this is all placed next to new Sidewalks.</text_data><comment_date>2014-04-16T00:00:00</comment_date></row><row _id="row-mq3g_qckk~hqfs" _uuid="00000000-0000-0000-62FF-42E0311E21E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mq3g_qckk~hqfs"><intent_id>537403</intent_id><project_id>696984</project_id><text_data>Other truck is a 75ft lowbed used to move heavy equipment</text_data><comment_date>2012-10-01T00:00:00</comment_date></row><row _id="row-vjje_gaph-i3jm" _uuid="00000000-0000-0000-813A-C8A9482043F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vjje_gaph-i3jm"><intent_id>952218</intent_id><project_id>866481</project_id><text_data>182199</text_data><comment_date>2018-12-26T00:00:00</comment_date></row><row _id="row-3du8-bd63~4tqz" _uuid="00000000-0000-0000-45CF-A6ECD9D7C61F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3du8-bd63~4tqz"><intent_id>1196272</intent_id><project_id>961764</project_id><text_data>Telecommunication wi-fi cablingAll work will be done indoors</text_data><comment_date>2021-12-01T00:00:00</comment_date></row><row _id="row-mdth-b274.d9qr" _uuid="00000000-0000-0000-9F0C-A69C435A6E81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mdth-b274.d9qr"><intent_id>1062385</intent_id><project_id>921094</project_id><text_data>S029924</text_data><comment_date>2020-06-03T00:00:00</comment_date></row><row _id="row-33dp_cng2.v29a" _uuid="00000000-0000-0000-ABB6-BF33BD532DEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-33dp_cng2.v29a"><intent_id>774820</intent_id><project_id>772354</project_id><text_data>The conveyor truck is 12ft by 30ft &amp; 9&amp;#39; width and holds up to 15 yards of soil at a time.</text_data><comment_date>2016-07-14T00:00:00</comment_date></row><row _id="row-p9jn~q3d7-apwm" _uuid="00000000-0000-0000-CBD7-287473BF99C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p9jn~q3d7-apwm"><intent_id>812100</intent_id><project_id>811682</project_id><text_data>Correction of Intent ID 804837</text_data><comment_date>2017-01-20T00:00:00</comment_date></row><row _id="row-t359~8khm.b6sk" _uuid="00000000-0000-0000-8096-C45E3DB8FB0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t359~8khm.b6sk"><intent_id>597693</intent_id><project_id>721402</project_id><text_data>Worker's Compensation through Idaho State Insurance Fund.  Reciprocal agreement with State of Washington</text_data><comment_date>2013-10-04T00:00:00</comment_date></row><row _id="row-k3z4_pfqj.f9zj" _uuid="00000000-0000-0000-C086-9758DC6BFA28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3z4_pfqj.f9zj"><intent_id>607659</intent_id><project_id>724243</project_id><text_data>Filed by Alvin Rossow</text_data><comment_date>2013-12-09T00:00:00</comment_date></row><row _id="row-rraw~vj7m.c4ur" _uuid="00000000-0000-0000-B298-B566D40312EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rraw~vj7m.c4ur"><intent_id>582442</intent_id><project_id>704714</project_id><text_data>Filed by Timothy Calhoun</text_data><comment_date>2013-07-22T00:00:00</comment_date></row><row _id="row-axrm~n4fz-sunv" _uuid="00000000-0000-0000-E457-0B5601472DB4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-axrm~n4fz-sunv"><intent_id>857200</intent_id><project_id>830473</project_id><text_data>Form Filed by Gary Lohman</text_data><comment_date>2017-08-21T00:00:00</comment_date></row><row _id="row-w6ay.vfms.emp3" _uuid="00000000-0000-0000-42D2-607E7E8AEA6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w6ay.vfms.emp3"><intent_id>879547</intent_id><project_id>839590</project_id><text_data>PC6 - Job #901-36CB</text_data><comment_date>2017-12-15T00:00:00</comment_date></row><row _id="row-ik7r-7ixj-gc28" _uuid="00000000-0000-0000-A834-B72E96CFA855" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ik7r-7ixj-gc28"><intent_id>780246</intent_id><project_id>798981</project_id><text_data>Residential single family Insulation / weatherization upgrade</text_data><comment_date>2016-08-05T00:00:00</comment_date></row><row _id="row-zupe_pkv3~3ndv" _uuid="00000000-0000-0000-B0A7-5701DBEDAF33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zupe_pkv3~3ndv"><intent_id>1233640</intent_id><project_id>1013334</project_id><text_data>0822062</text_data><comment_date>2022-05-16T00:00:00</comment_date></row><row _id="row-643f_xq4n~wb94" _uuid="00000000-0000-0000-1F2E-72E4B1BC6B13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-643f_xq4n~wb94"><intent_id>652925</intent_id><project_id>743762</project_id><text_data>The other truck is used as Water Truck that holds less than 5000 gallons of water used for dust control.</text_data><comment_date>2014-09-08T00:00:00</comment_date></row><row _id="row-2c68.hyya_ksjt" _uuid="00000000-0000-0000-6E86-76AD41B76209" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2c68.hyya_ksjt"><intent_id>981770</intent_id><project_id>846327</project_id><text_data>0419001</text_data><comment_date>2019-06-03T00:00:00</comment_date></row><row _id="row-85p4-8sgq_a7jt" _uuid="00000000-0000-0000-13F7-5BC5813E7F06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-85p4-8sgq_a7jt"><intent_id>874668</intent_id><project_id>837405</project_id><text_data>1)We were contracted to install a Goodman gas furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-11-14T00:00:00</comment_date></row><row _id="row-uujz.xhqd-bj6e" _uuid="00000000-0000-0000-9385-FD1DF3C5AF7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uujz.xhqd-bj6e"><intent_id>534105</intent_id><project_id>695807</project_id><text_data>OTHER TRUCKS = WATER TRUCK FOR DUST CONTROL AND CLEAN UP</text_data><comment_date>2012-09-12T00:00:00</comment_date></row><row _id="row-e398.6ajd~fyva" _uuid="00000000-0000-0000-DE51-54242A912E4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e398.6ajd~fyva"><intent_id>866505</intent_id><project_id>830855</project_id><text_data>JCI Project Number 7N59-0282</text_data><comment_date>2017-10-02T00:00:00</comment_date></row><row _id="row-qefm_k7id.wsrb" _uuid="00000000-0000-0000-820A-5AB0FDA8433E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qefm_k7id.wsrb"><intent_id>514922</intent_id><project_id>681159</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements.Form filed by Sandra J Freeling - looe235</text_data><comment_date>2012-06-04T00:00:00</comment_date></row><row _id="row-pk8z_8jm3-errm" _uuid="00000000-0000-0000-3591-F7DDB2C3B72B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pk8z_8jm3-errm"><intent_id>1009798</intent_id><project_id>894280</project_id><text_data>From Julie Rosario: 'Note: You will need to file one intent to pay prevailing wages for the entire agreement period and after each Task Order is complete, file one affidavit for each (One Intent and multiple Affidavits).' Blythe Job or Work Order Number assigned by Task Order. See also Blythe P&amp;H (BLYTHI*235L0) Intent 970856, and Affidavits 859710; 867437; and 870506This Intent for work on or after 08/02/2019 (Initial job this Intent: W-234)</text_data><comment_date>2019-09-25T00:00:00</comment_date></row><row _id="row-ygcx_j9c2.4h4f" _uuid="00000000-0000-0000-9AFA-CF7D175C5207" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ygcx_j9c2.4h4f"><intent_id>755795</intent_id><project_id>768182</project_id><text_data>Filed by Jennifer Collins</text_data><comment_date>2016-04-11T00:00:00</comment_date></row><row _id="row-bn8q_eub9~z5s4" _uuid="00000000-0000-0000-C32E-B73C9BC5007E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bn8q_eub9~z5s4"><intent_id>840467</intent_id><project_id>820266</project_id><text_data>HIRED BY C D K CONSTRUCTION</text_data><comment_date>2017-06-14T00:00:00</comment_date></row><row _id="row-6z6k~qc7h_2533" _uuid="00000000-0000-0000-0B59-E2C2E7DD9BCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6z6k~qc7h_2533"><intent_id>919491</intent_id><project_id>854097</project_id><text_data>Contractor No. NORTHRC832P7</text_data><comment_date>2018-07-19T00:00:00</comment_date></row><row _id="row-333q.v3em~n6ib" _uuid="00000000-0000-0000-544C-426510C9CD40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-333q.v3em~n6ib"><intent_id>733290</intent_id><project_id>762071</project_id><text_data>On 11/03/2014, a payment of $71.00 was sent to Washington State DOR-Business Licensing Service with confirmation number 00813Z. On 11/02/2015, a payment of $71.00 was sent to Washington State DOR-Business Licensing Service with confirmation number 00256B.</text_data><comment_date>2015-12-09T00:00:00</comment_date></row><row _id="row-v9ww.wgmp.smxb" _uuid="00000000-0000-0000-28DC-8DF072F229F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v9ww.wgmp.smxb"><intent_id>586957</intent_id><project_id>684841</project_id><text_data>Owner performed work./No employees</text_data><comment_date>2013-08-12T00:00:00</comment_date></row><row _id="row-jrvi-8p9r~kpab" _uuid="00000000-0000-0000-CED8-53E1FA27CAD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jrvi-8p9r~kpab"><intent_id>1318070</intent_id><project_id>1062423</project_id><text_data>9907020</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-knuj_27xp.gn55" _uuid="00000000-0000-0000-5A48-0CB0EDCCD30F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knuj_27xp.gn55"><intent_id>547029</intent_id><project_id>700797</project_id><text_data>DEI Job 11633</text_data><comment_date>2012-12-04T00:00:00</comment_date></row><row _id="row-2m4x_dew5-s5cr" _uuid="00000000-0000-0000-3A60-C5236FA2DB69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2m4x_dew5-s5cr"><intent_id>1175812</intent_id><project_id>975698</project_id><text_data>Single Family Home#1 - Describe the work that your firm was contracted to perform INSULATION#2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominiumNO, or other residential structure? NO#3 - Including any basement or garage, how many stories or levels does the structure have? ONE#4 - What is the building used for? --Answer 'yes' or 'no' to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO G) Is each room and/or bed in the structure rented separately? NO (k) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager's office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2021-09-08T00:00:00</comment_date></row><row _id="row-tbgk.pm4n~y6qx" _uuid="00000000-0000-0000-ED3A-CA4B7C90B9AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tbgk.pm4n~y6qx"><intent_id>775327</intent_id><project_id>791342</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2016-07-22T00:00:00</comment_date></row><row _id="row-2x3q.6jhx~iyxb" _uuid="00000000-0000-0000-16C3-2F1A7A7C3789" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2x3q.6jhx~iyxb"><intent_id>1004081</intent_id><project_id>892001</project_id><text_data>#20515, Blume Michels, Lauriea, 4202 E Buckeye, Spokane</text_data><comment_date>2019-09-16T00:00:00</comment_date></row><row _id="row-vqj6~466p-f35j" _uuid="00000000-0000-0000-4F7B-6295DF2ADE37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vqj6~466p-f35j"><intent_id>1318053</intent_id><project_id>1062413</project_id><text_data>9911360</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-yxxb-jsen.vc6t" _uuid="00000000-0000-0000-A6E3-0F54A91680DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yxxb-jsen.vc6t"><intent_id>1318064</intent_id><project_id>1062417</project_id><text_data>9915808</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-atbf~dhge_j6yt" _uuid="00000000-0000-0000-4704-CBB4F3074CD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-atbf~dhge_j6yt"><intent_id>1321650</intent_id><project_id>991014</project_id><text_data>Job#1123006</text_data><comment_date>2023-04-21T00:00:00</comment_date></row><row _id="row-bnyv-u9s6_cf8p" _uuid="00000000-0000-0000-327E-99147D41FEC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bnyv-u9s6_cf8p"><intent_id>771300</intent_id><project_id>791245</project_id><text_data>Filed by Kraig ArndtProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirementsProject Site Addresses:EB Wilson Building-1202 South M Street, Tacoma WA 98405 Davis �Bacon (Commercial) Rates                Apply WA150038 3/27/15Fawcett Apartments-3201 Fawcett Ave, Tacoma WA 98418 Davis- Bacon Residential Rates Apply WA150118 3/27/15Wright Street Apartments- 602 South Wright Street, Tacoma WA 98418 Davis-Bacon Residential Rates Apply WA150118 3/27/15K Street Apartments- 911 North K Street, Tacoma WA 98403 Davis-Bacon Residential Rates Apply WA150118 3/27/15Ludwig Apartments-5425 South Lawrence Street, Tacoma WA 98409 Davis-Bacon Residential Rates Apply WA150118 3/27/15G Street Apartments- 401 North G Street Tacoma WA 98225 Davis-Bacon Residential Rates Apply WA150118 3/27/156th Avenue Apartments- 2302 6th Avenue, Tacoma WA 98225 Davis-Bacon Residential Rates Apply WA150118 3/27/15Bergerson Terrace Apartments- 5301 South Orchard, Tacoma WA 98229 Davis-Bacon Residential Rates Apply WA150118 3/27/15Dixon Village- 5401 South Stevens, Tacoma WA 98409 Davis-Bacon Residential Rates Apply WA150118 3/27/15</text_data><comment_date>2016-06-28T00:00:00</comment_date></row><row _id="row-3z3m~a6uw~872n" _uuid="00000000-0000-0000-FAC8-11B68245F436" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3z3m~a6uw~872n"><intent_id>1266208</intent_id><project_id>1030825</project_id><text_data>IFS WO# 128479, City of Bellevue, invasives removal and pruning by hand with hand tools.</text_data><comment_date>2022-09-13T00:00:00</comment_date></row><row _id="row-bwyk~98c2~i22f" _uuid="00000000-0000-0000-77BB-4FFD67053422" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bwyk~98c2~i22f"><intent_id>489785</intent_id><project_id>677703</project_id><text_data>Other Trucks = Water to keep dust down at job site.Laborer's = Shovel and broom to keep job site clean.</text_data><comment_date>2011-11-17T00:00:00</comment_date></row><row _id="row-cqv4~iyy4~apnu" _uuid="00000000-0000-0000-CF3F-72569722DB86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqv4~iyy4~apnu"><intent_id>1119481</intent_id><project_id>948943</project_id><text_data>KL2102 PUBLIC WORKS ALARM PANEL</text_data><comment_date>2021-02-02T00:00:00</comment_date></row><row _id="row-ckzf~9w7n~2idc" _uuid="00000000-0000-0000-FB87-D453579FC763" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ckzf~9w7n~2idc"><intent_id>462834</intent_id><project_id>668859</project_id><text_data>General laborer duties include shoveling dirt, and Other trucks includes a 4000 gal water truck used for dust control</text_data><comment_date>2011-06-27T00:00:00</comment_date></row><row _id="row-7ipm~vm9t-2maa" _uuid="00000000-0000-0000-2BFD-F045D7E00776" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ipm~vm9t-2maa"><intent_id>889857</intent_id><project_id>844470</project_id><text_data>The President and Owner Tom Gibelyou will be the only working on this project.</text_data><comment_date>2018-02-23T00:00:00</comment_date></row><row _id="row-2p78~ja3b-u5yf" _uuid="00000000-0000-0000-E5CC-FC79831BB86B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2p78~ja3b-u5yf"><intent_id>1150124</intent_id><project_id>927285</project_id><text_data>PROVIDE AND INSTALL CABLES FROM MDF TO IDF AND FROM RACK TO RACK FOR DATA NETWORK DROPS AT LOCATIONS T-D-12 AND 23B.. INSTALL SOUND MASKING OPERATIONAL SYSTEM. ALL WORK IS PERFORMED INSIDE.</text_data><comment_date>2021-06-07T00:00:00</comment_date></row><row _id="row-rcwe_r8v5_ttsa" _uuid="00000000-0000-0000-BD4F-329320817E50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rcwe_r8v5_ttsa"><intent_id>789884</intent_id><project_id>802669</project_id><text_data>Prime job #3167290</text_data><comment_date>2016-09-19T00:00:00</comment_date></row><row _id="row-8de5~caya~vmp5" _uuid="00000000-0000-0000-7D7B-E49D78482505" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8de5~caya~vmp5"><intent_id>1160973</intent_id><project_id>968634</project_id><text_data>1.Replace bath fan &amp; switch replace kitchen fan2.Single Family Dwelling3.14.a. No; b. No; c. Yes; d. No; e. No; f. No; g. No; h. No; i. No; j. No; k. No; l. No5.Yes6.Yes7.No8.No</text_data><comment_date>2021-07-16T00:00:00</comment_date></row><row _id="row-yejz-at8y~c349" _uuid="00000000-0000-0000-B2FC-3E7A5B2CFD8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yejz-at8y~c349"><intent_id>755395</intent_id><project_id>668560</project_id><text_data>Originally filed Intent#583380 07/25/2013, upon filing the affidavit was advised to file a new Intent as there was employee on the project.</text_data><comment_date>2016-04-07T00:00:00</comment_date></row><row _id="row-gin9~aw3j.xu9d" _uuid="00000000-0000-0000-FBC7-F7C5D0893A91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gin9~aw3j.xu9d"><intent_id>713924</intent_id><project_id>742942</project_id><text_data>065031</text_data><comment_date>2015-08-12T00:00:00</comment_date></row><row _id="row-z5qw~qdyb.djqt" _uuid="00000000-0000-0000-D699-35513B05B932" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z5qw~qdyb.djqt"><intent_id>630947</intent_id><project_id>733170</project_id><text_data>Landscape restoration and hydroseeding and is in alignment pursuant to WAC quoted by your offices.</text_data><comment_date>2014-05-22T00:00:00</comment_date></row><row _id="row-3fpi.qauy~dg3j" _uuid="00000000-0000-0000-E536-19B78FE40C62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3fpi.qauy~dg3j"><intent_id>1118145</intent_id><project_id>948233</project_id><text_data>Project# 02929, Chaban, Dmitri, 12503 N Cherokee Dr, Newman Lake, WA 99025</text_data><comment_date>2021-02-24T00:00:00</comment_date></row><row _id="row-44ve~45b5_yiy5" _uuid="00000000-0000-0000-1E54-5BA9A644450F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-44ve~45b5_yiy5"><intent_id>905628</intent_id><project_id>851142</project_id><text_data>PC1 Job #4130CB</text_data><comment_date>2018-05-18T00:00:00</comment_date></row><row _id="row-4x8r_9bdz.36g4" _uuid="00000000-0000-0000-C1FB-C90634957349" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4x8r_9bdz.36g4"><intent_id>884679</intent_id><project_id>842064</project_id><text_data>1. Change out existing electrical panels, provide and install ACFI type breakers and reconnect conductors. 2. Apartment  3. four (4) levels 4. a) no b) no c) yes d) no e) no f) no g) no h) no i) no j) no k0 no l) none     5. yes 6. yes  7. no  8. no</text_data><comment_date>2018-01-23T00:00:00</comment_date></row><row _id="row-j7wv_mzxq.38mj" _uuid="00000000-0000-0000-9656-E30961DDE838" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j7wv_mzxq.38mj"><intent_id>1318445</intent_id><project_id>1062633</project_id><text_data>40050546</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-tjth-9wsv-6eq8" _uuid="00000000-0000-0000-DB39-EC3E018DBAF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tjth-9wsv-6eq8"><intent_id>778152</intent_id><project_id>792277</project_id><text_data>$22.58 Pension$1.11 CITC</text_data><comment_date>2016-08-08T00:00:00</comment_date></row><row _id="row-hgpn_fate~3gh6" _uuid="00000000-0000-0000-6654-2B1D42612F95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hgpn_fate~3gh6"><intent_id>935067</intent_id><project_id>857057</project_id><text_data>Filed by Carl P. Bradley</text_data><comment_date>2018-09-24T00:00:00</comment_date></row><row _id="row-eekk~eevk-9wwi" _uuid="00000000-0000-0000-6320-4CF7B97F53CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eekk~eevk-9wwi"><intent_id>530619</intent_id><project_id>691095</project_id><text_data>Field By Johannes Kohn</text_data><comment_date>2012-08-24T00:00:00</comment_date></row><row _id="row-xf4r~kicy-fj6a" _uuid="00000000-0000-0000-2D42-99099D5E6370" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xf4r~kicy-fj6a"><intent_id>832749</intent_id><project_id>820634</project_id><text_data>REPAIR # 402537 SEASERVICE &amp; REPAIR PO 641711</text_data><comment_date>2017-05-12T00:00:00</comment_date></row><row _id="row-jq4y_cdsj_cqe8" _uuid="00000000-0000-0000-CE61-2F037D82414F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jq4y_cdsj_cqe8"><intent_id>825732</intent_id><project_id>813461</project_id><text_data>1-electrical   2-other residential structure  3-three levels + detached garage  4-e Transitional housing 5-no  6-yes        7-office  8-unknown</text_data><comment_date>2017-04-11T00:00:00</comment_date></row><row _id="row-twkw_x3nb~v4nn" _uuid="00000000-0000-0000-2474-C7F24AF11BE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-twkw_x3nb~v4nn"><intent_id>1175532</intent_id><project_id>978281</project_id><text_data>Workers compensation insurance provided with reciprocating state extraterritorial certificate UT WCF 2033000</text_data><comment_date>2021-09-07T00:00:00</comment_date></row><row _id="row-qrir_r46n~pknu" _uuid="00000000-0000-0000-3B28-DFADA7044461" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qrir_r46n~pknu"><intent_id>1318231</intent_id><project_id>1062527</project_id><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-p74q.9p4n-t4x7" _uuid="00000000-0000-0000-F112-0F00676347AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p74q.9p4n-t4x7"><intent_id>666507</intent_id><project_id>609628</project_id><text_data>PLEASE REFERENCE POWERCOM JOB #922418.TELECOMMUNICATIONS TECH PROVIDED TO TERMINATE AND TEST 5 CABLES IN VETERINARY MEDICINE BLDG.</text_data><comment_date>2014-11-19T00:00:00</comment_date></row><row _id="row-jvuv.r2et~ty2a" _uuid="00000000-0000-0000-0DC9-5D9F69BC193F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jvuv.r2et~ty2a"><intent_id>906470</intent_id><project_id>851490</project_id><text_data>WO #8036396</text_data><comment_date>2018-05-23T00:00:00</comment_date></row><row _id="row-bsft.a5z9~5sxj" _uuid="00000000-0000-0000-9498-3BD17915DFD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bsft.a5z9~5sxj"><intent_id>1123824</intent_id><project_id>919872</project_id><text_data>WRI Job # 21.850/ 46220</text_data><comment_date>2021-02-22T00:00:00</comment_date></row><row _id="row-dwg8-2nkf~kgkj" _uuid="00000000-0000-0000-BE73-73F471FBC75D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dwg8-2nkf~kgkj"><intent_id>700260</intent_id><project_id>764677</project_id><text_data>Truck Driver - Dump Truck- description: Dump Truck 8-14 CYPower Operator - Paving machine - 1 Micro pave operator- 1 Foreman</text_data><comment_date>2015-06-16T00:00:00</comment_date></row><row _id="row-z4nh_6bat.ndqu" _uuid="00000000-0000-0000-87A3-A2284C63A054" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z4nh_6bat.ndqu"><intent_id>1151402</intent_id><project_id>900189</project_id><text_data>$31.53 Fringe package includes: $9.16 health, $11.00 pension, $7.95 annuity, $2.40 paid time off, $0.74 apprenticeship, $0.28 impact</text_data><comment_date>2021-06-10T00:00:00</comment_date></row><row _id="row-q59e.hx9i~qnrq" _uuid="00000000-0000-0000-42D0-2BAAAE3314F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q59e.hx9i~qnrq"><intent_id>950383</intent_id><project_id>863722</project_id><text_data>0719001</text_data><comment_date>2018-12-12T00:00:00</comment_date></row><row _id="row-jxj8.pjgm_rmei" _uuid="00000000-0000-0000-E13B-681CFC2FCD6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jxj8.pjgm_rmei"><intent_id>950856</intent_id><project_id>868716</project_id><text_data>Job #202760-003</text_data><comment_date>2018-12-14T00:00:00</comment_date></row><row _id="row-zhhb~q3j4.cu8b" _uuid="00000000-0000-0000-65BF-3E0A0FF20893" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhhb~q3j4.cu8b"><intent_id>958801</intent_id><project_id>872514</project_id><text_data>All work is scheduled to be performed by the subcontractor.  An employee was added to this intent in case the need arises for a tech to be on site.  We were advised to 'always list a worker on your Intent. You can remove them when filing the Affidavit if they were not used,' to avoid having to refile.</text_data><comment_date>2019-02-05T00:00:00</comment_date></row><row _id="row-cp5u_8gxk-hn78" _uuid="00000000-0000-0000-A04A-A8CEF76EFE8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cp5u_8gxk-hn78"><intent_id>499276</intent_id><project_id>681838</project_id><text_data>Annabel Mendoza300030-542916 E. Chestnut StYakima, WA  98901</text_data><comment_date>2012-02-06T00:00:00</comment_date></row><row _id="row-2x89~v6ia.a4s8" _uuid="00000000-0000-0000-CCEE-C66CF9424B08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2x89~v6ia.a4s8"><intent_id>677220</intent_id><project_id>744506</project_id><text_data>S35009 - Portland</text_data><comment_date>2015-01-30T00:00:00</comment_date></row><row _id="row-gzmq~sv86-g2np" _uuid="00000000-0000-0000-6545-20210EC5D94F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzmq~sv86-g2np"><intent_id>814343</intent_id><project_id>810825</project_id><text_data>New Contract number 009050</text_data><comment_date>2017-03-13T00:00:00</comment_date></row><row _id="row-xgrk-2hmt-v2qv" _uuid="00000000-0000-0000-6A35-EC98FDF6D335" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xgrk-2hmt-v2qv"><intent_id>857568</intent_id><project_id>830585</project_id><text_data>Owner &amp; operator, Randal Barger, to work as PW carpenter.  No owner wages or time reported on Certified Payroll reports.</text_data><comment_date>2017-08-22T00:00:00</comment_date></row><row _id="row-sknx_6ufu~aevh" _uuid="00000000-0000-0000-EA85-D4954DEBCF41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sknx_6ufu~aevh"><intent_id>823386</intent_id><project_id>811220</project_id><text_data>PARKING LOT IMPROVEMENTS AT STEVE COX MEMORIAL PARKPAVEMENT REPAIR AND OVERLAY MAINTENANCE IN PARKING LOT, WHICH INCLUDES CONCRETE, SITE WORK/EXTERIOR IMPROVEMENTS &amp; EARTHWORK.</text_data><comment_date>2017-04-04T00:00:00</comment_date></row><row _id="row-qs3z-jujm-ibnd" _uuid="00000000-0000-0000-C197-38B3830AE4F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qs3z-jujm-ibnd"><intent_id>1247077</intent_id><project_id>1020873</project_id><text_data>PROVIDE AND INSTALL 2 EACH CAT6A CABLES FROM MDF TO TWO LOCATIONS PER DRAWINGS PROVIDED. MOUNT OUTLETS AT TV HEIGHT. CUSTOMER TO PROVIDE ALL MATERIAL EXCEPT CABLE SUPPORTS AND FIRESTOP.</text_data><comment_date>2022-07-07T00:00:00</comment_date></row><row _id="row-86x7~zmv2~tjjy" _uuid="00000000-0000-0000-47B4-22B0C75CF328" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-86x7~zmv2~tjjy"><intent_id>1057940</intent_id><project_id>918949</project_id><text_data>� Installation of [002] coax cables to [001] location.� Supply and install materials to support an open pathway, such as J-hooks and hangers where possible.</text_data><comment_date>2020-05-14T00:00:00</comment_date></row><row _id="row-4txs_b6tv-mngs" _uuid="00000000-0000-0000-EFF6-F876BE4D58A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4txs_b6tv-mngs"><intent_id>864019</intent_id><project_id>833074</project_id><text_data>Multiple potential locations for PO#1000228518; please see address listed in notes. Ben Franklin Elementary School12434 NE 60th St.Kirkland, WA 98033</text_data><comment_date>2017-09-20T00:00:00</comment_date></row><row _id="row-h5pn_kuj3-a9zp" _uuid="00000000-0000-0000-F747-529EF65DE947" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h5pn_kuj3-a9zp"><intent_id>1318416</intent_id><project_id>1026492</project_id><text_data>SPM# 27163</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-ervp-szf7.ad3k" _uuid="00000000-0000-0000-BB14-6C6D91F88424" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ervp-szf7.ad3k"><intent_id>895314</intent_id><project_id>786250</project_id><text_data>�Project is exempt from state prevailing wage requirements based onThe Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirementsFor the following crafts/trades/occupations.�  The Residential Electrician rate will be $35.14 with fringe of $11.18.</text_data><comment_date>2018-04-09T00:00:00</comment_date></row><row _id="row-5ccm-4h23~ikk7" _uuid="00000000-0000-0000-9961-DA13AB596E22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ccm-4h23~ikk7"><intent_id>570691</intent_id><project_id>701969</project_id><text_data>1513061</text_data><comment_date>2013-05-21T00:00:00</comment_date></row><row _id="row-3jj9~2wvg_bfwy" _uuid="00000000-0000-0000-094A-992EE7DD93FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3jj9~2wvg_bfwy"><intent_id>1176994</intent_id><project_id>979012</project_id><text_data>The contract number of CC2000165 is incorrect. The contract number has been updated to CC2103165 as requested by Tammie Pitzler of Vortex Services. Thank you.</text_data><comment_date>2021-10-04T00:00:00</comment_date></row><row _id="row-56hw.paiv-ja3s" _uuid="00000000-0000-0000-5335-6D1B0FA55702" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-56hw.paiv-ja3s"><intent_id>609793</intent_id><project_id>721880</project_id><text_data>Filed by Grant A. Ferry.</text_data><comment_date>2013-12-24T00:00:00</comment_date></row><row _id="row-akui.ia38-g6yk" _uuid="00000000-0000-0000-18AE-D6FBC5B22812" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-akui.ia38-g6yk"><intent_id>706154</intent_id><project_id>756595</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Removal of insulation#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single-family residence#3 - Including any basement or garage, how many stories or levels does the structure have? Two#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure?  No(b) Any retail use in the structure? No(c) Permanent residence only? Yes(d) Rehabilitation house? No(e) Transitional housing? No(f) Communal dining facility? No(g) Treatment services? No(h) Dormitories? No(i) Counseling? No(j) Is each room and/or bed in the structure rented separately? No(k) Other? No#5 - Does each dwelling unit have its own self-contained kitchen? No#6 - Does each dwelling unit have its own bathroom? No#7 - Is there a community facility or manager�s office on site? No#8 - Is any part of the structure used by members of the public?No</text_data><comment_date>2015-07-16T00:00:00</comment_date></row><row _id="row-i4eg~gqxb~zqm2" _uuid="00000000-0000-0000-FDF0-0D4630217262" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i4eg~gqxb~zqm2"><intent_id>506592</intent_id><project_id>685404</project_id><text_data>My company did the entire job.  We planted seedlings with a biodegradable tube around the seedling for protection.We then placed mulch 3&amp;quot; deep around each seedling.  The only tool the workers used was a shovel.  I delivered the mulch to them with my quad pulling a trailer full of mulch.</text_data><comment_date>2012-04-05T00:00:00</comment_date></row><row _id="row-pr72.vkbu_ayh3" _uuid="00000000-0000-0000-FD04-E902DC784820" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pr72.vkbu_ayh3"><intent_id>733484</intent_id><project_id>777766</project_id><text_data>The Truck Drivers, Other Trucks classification is for Water Trucks.</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-9he3.pbke.trxk" _uuid="00000000-0000-0000-3B60-B647F0FEC00C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9he3.pbke.trxk"><intent_id>700276</intent_id><project_id>764684</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-06-12T00:00:00</comment_date></row><row _id="row-q7cc~zsap_evsj" _uuid="00000000-0000-0000-3AF3-060F2B6DC995" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q7cc~zsap_evsj"><intent_id>1206422</intent_id><project_id>996450</project_id><text_data>Corrected Award DateMotor Pat Grader to vacuum all contaminated liquidsHaz Waste worker to clear area of all debris using shovel/rake/broom</text_data><comment_date>2022-02-10T00:00:00</comment_date></row><row _id="row-t9c5_g5fk.ej92" _uuid="00000000-0000-0000-C607-220179DC8012" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9c5_g5fk.ej92"><intent_id>1110635</intent_id><project_id>943970</project_id><text_data>Electric furnace not heating.  Found problem to be the breaker in furnace was turned off. Turned breaker on. Furnace is now heating.</text_data><comment_date>2020-12-31T00:00:00</comment_date></row><row _id="row-gqff.gc4k-a3j4" _uuid="00000000-0000-0000-49C4-6EE49E912A92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqff.gc4k-a3j4"><intent_id>861464</intent_id><project_id>832119</project_id><text_data>Install new cables that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-09-08T00:00:00</comment_date></row><row _id="row-hy7e~8ajv~dig5" _uuid="00000000-0000-0000-3009-42F07C9F42CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hy7e~8ajv~dig5"><intent_id>741875</intent_id><project_id>782803</project_id><text_data>Remove derelict vessel and all contaminated liquidsGeneral Laborers to clear debris using brooms, shovelsMotorPatrol Grader to vacuum all contaminated liquidsExcavator to move large debris</text_data><comment_date>2016-01-15T00:00:00</comment_date></row><row _id="row-9gph_ewiw.f2hf" _uuid="00000000-0000-0000-9C4E-C896945451B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9gph_ewiw.f2hf"><intent_id>780788</intent_id><project_id>786610</project_id><text_data>Job # 14703</text_data><comment_date>2016-08-09T00:00:00</comment_date></row><row _id="row-qbwm-xa56_bjha" _uuid="00000000-0000-0000-3620-676F9CD854A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbwm-xa56_bjha"><intent_id>1034656</intent_id><project_id>906260</project_id><text_data>1) Service the furnace2) Single family dwelling3) 14) Residential Home	a) No	b) No	c) Yes	d) No	e) No	f) No	g) No	h) No	i) No	j) No	k) No5) Yes6) Yes7) No8) No</text_data><comment_date>2020-01-29T00:00:00</comment_date></row><row _id="row-vn6d~abby.usiv" _uuid="00000000-0000-0000-024D-674368209F9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vn6d~abby.usiv"><intent_id>957669</intent_id><project_id>871978</project_id><text_data>The scope of work for maintenance services includes :  (This contract is for multiple sites which have different schedules but however the same work is performed, using the same tools.)Turf:Mowing � using regular push mowersTrimming � using a hand held 2 hp weed wackerEdging � using a hand held 2 hp edgerFertilizing � using a walk behind fertilizer spreaderHerbicide application � using back pack sprayer 4 gallonTREES, SHRUBS AND GROUND COVER BEDSWeeding � using hula hoes, a rake to pile up and hand stuffed into a garbage bag.Trimming Ground Cover � trimming/pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage can.Pruning Shrubs - trimming / pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage canPre-emergent Herbicide � hand held spreaderHARD SURFACES	Sweeping � using back pack air blowers Weeds � using back pack sprayer 4 gallonOTHERLeaf Removal � Raked into piles and placed into 30 gallon garbage cans.Litter � Picked up by hand and placed into garbage bags.ANNUAL FLOWER BEDSChange Annual Color � remove existing annual color with shovels, replace with new annual color and cover new material using shovel and rake bed using hand held rakes.Fertilizer � applied using a hand held spreaderGroom Annuals � no tools, hand groomingWeeding - no tools, hand weedingHerbicide � applied using back pack sprayersIRRIGATIONSystem Start-up � small shovel to remove dirt from system.Operate System � no toolsWinterize System � air compressor is used to blow system.All work is hauled off site with a F-350 Ford Truck.</text_data><comment_date>2019-01-29T00:00:00</comment_date></row><row _id="row-x5d9~3ie6-4u28" _uuid="00000000-0000-0000-D83A-1143B8E298FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x5d9~3ie6-4u28"><intent_id>965500</intent_id><project_id>869733</project_id><text_data>1. Install windows. 2. Single family dwelling. 3. One story homes. 4. (a) No, (b) No, (c)Yes, (d) No, (e) No, (f) No, (g) No, (h) No, (i) None. 5. Each dwelling has it's own kitchen. 6. Each dwelling has it's own bathroom. 7. No community managers office on site. 8. No, each dwelling is a private single family dwelling.</text_data><comment_date>2019-03-15T00:00:00</comment_date></row><row _id="row-2hhi_kq4s~bgei" _uuid="00000000-0000-0000-B04E-649B7419741B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2hhi_kq4s~bgei"><intent_id>1001717</intent_id><project_id>878076</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project?Provide and Install HVAC DDC control system2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No3. Does this specific project entail the remodeling or new construction of a facility?Remodel of the existing4. If your firm is working upon a type of building system, what type of system is involved?HVAC Direct Digital Control Systems5. What specific tasks did your employees perform? Engineering, Programming, component testing and operation verification6. What, if any, tools did your employees use in the performance of those tasks?Laptop and software.7. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? Interface to system using laptop computers and software for programming, checkout and commissioning. 8. Are you going to be hiring any subcontractors for this project?Yes.</text_data><comment_date>2019-08-22T00:00:00</comment_date></row><row _id="row-3gv9.utqy-fxgq" _uuid="00000000-0000-0000-4633-DA986D19D356" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gv9.utqy-fxgq"><intent_id>795335</intent_id><project_id>804710</project_id><text_data>n order to finish processing your form, we need more information. A) Please describe the whole project. B) Please specifically describe the duties being performed by the General Laborer and any tools, equipment, or vehicles used. Thank you.A) Setting a Clark PUD transformer and meter for irrigation. B) Laying and compacting rock using hand tools.</text_data><comment_date>2016-10-18T00:00:00</comment_date></row><row _id="row-ugst.qpiz-iusr" _uuid="00000000-0000-0000-CDC2-6FE53C5F502F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ugst.qpiz-iusr"><intent_id>699400</intent_id><project_id>737753</project_id><text_data>The closest occupation on the list was power line clearance for tree trimmers. I am unsure if a power line was actually cleared. We are normally Fallers and Buckers Chain Saws at $41.59per hr in Thurston County. 7A 2Y per Reasa Pearson with LNI on 8.9.13. Our scope of work was &amp;quot;Remove 5 Lombardi Poplars along roadway. Leave all debris and wood onsite&amp;quot;</text_data><comment_date>2015-06-09T00:00:00</comment_date></row><row _id="row-wk5t~r9p2-5r5k" _uuid="00000000-0000-0000-7BA2-23485F400127" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wk5t~r9p2-5r5k"><intent_id>878983</intent_id><project_id>839300</project_id><text_data>Project will take place at two locations.</text_data><comment_date>2017-12-13T00:00:00</comment_date></row><row _id="row-k8ja-ev5q.xcj9" _uuid="00000000-0000-0000-DBF9-34964E82BBFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k8ja-ev5q.xcj9"><intent_id>800507</intent_id><project_id>806830</project_id><text_data>Blairco Job 16-69281-Install ductless heat pump2-Duplex3-14-a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no5-yes6-yes7-no8-no</text_data><comment_date>2016-11-09T00:00:00</comment_date></row><row _id="row-6wsb-i8yz.v9cp" _uuid="00000000-0000-0000-15D9-2D5D4DC7AA52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6wsb-i8yz.v9cp"><intent_id>638556</intent_id><project_id>734824</project_id><text_data>143662</text_data><comment_date>2014-07-01T00:00:00</comment_date></row><row _id="row-dhis~d2fw-gjsm" _uuid="00000000-0000-0000-6441-9B5CFE8ACB84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dhis~d2fw-gjsm"><intent_id>447340</intent_id><project_id>662575</project_id><text_data>Laura Green 6289 Vista Drive Ferndale WA 98248</text_data><comment_date>2011-03-25T00:00:00</comment_date></row><row _id="row-wgca~qwvz~6zk6" _uuid="00000000-0000-0000-9748-3C45B7009E6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wgca~qwvz~6zk6"><intent_id>554784</intent_id><project_id>704259</project_id><text_data>Used a broom to sweep up debris, picked up the debris that was swept into a shovel, put debris into a garbage can.</text_data><comment_date>2013-06-06T00:00:00</comment_date></row><row _id="row-3ujj_gb2y-zm9k" _uuid="00000000-0000-0000-015B-48AB1EC093B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ujj_gb2y-zm9k"><intent_id>899240</intent_id><project_id>842937</project_id><text_data>1. Deck coating2.apt3.24. a.no b.no c.yes d.no e.no f.no g.no h.no I.no j.no k.no L. n/a 5.yes6.yes7.no8.no</text_data><comment_date>2018-04-18T00:00:00</comment_date></row><row _id="row-377d~c5kc.z9q7" _uuid="00000000-0000-0000-5655-7E7A5DB56AFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-377d~c5kc.z9q7"><intent_id>623751</intent_id><project_id>732519</project_id><text_data>#1 Remove and replace exterior doors and windows for sound insulation for residential home owners.  #2  this project has two single family dwellings and 2 duplex's #3 property #1 2655 South Hanford St Seattle, WA one story house, property #2 7945 Martin luther king jr way s one story house, property #3 3224 Morse ave S duplex, Property #4 3226 Morse ave s duplex #4 (a) no (b) no (c) #1 yes #2,3 &amp; 4 rentals, (d) no (e) no (f) no (g) no (h) no (i) no (j) no (k) n/a #5 yes #6 yes #7 no #8 no</text_data><comment_date>2014-04-07T00:00:00</comment_date></row><row _id="row-tt46_u3vh.2x88" _uuid="00000000-0000-0000-072C-B99C75EB0234" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tt46_u3vh.2x88"><intent_id>655643</intent_id><project_id>743109</project_id><text_data>I Levi Picard was hired by Granite I will not be hiring anyone at this time</text_data><comment_date>2014-09-18T00:00:00</comment_date></row><row _id="row-43iq~45zp-qr86" _uuid="00000000-0000-0000-1EBD-13750DE1B0B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-43iq~45zp-qr86"><intent_id>629532</intent_id><project_id>734920</project_id><text_data>Job Number #206550</text_data><comment_date>2014-05-14T00:00:00</comment_date></row><row _id="row-bmza-6g2f_66ix" _uuid="00000000-0000-0000-F824-4C717603993F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmza-6g2f_66ix"><intent_id>1194718</intent_id><project_id>933110</project_id><text_data>Truck driven will be a Ford F450 to haul parts from Vancouver to Federal Way</text_data><comment_date>2021-11-22T00:00:00</comment_date></row><row _id="row-zu5w.ad99_7m6t" _uuid="00000000-0000-0000-D618-1EBA82B6917D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zu5w.ad99_7m6t"><intent_id>1022208</intent_id><project_id>792683</project_id><text_data>Power Equipment - Conveyor Aggregate Delivery System (c.a.d.) did not exist as of the date of this job bid due date / contract date, thus used 'other truck'</text_data><comment_date>2019-12-11T00:00:00</comment_date></row><row _id="row-d46b-7xee~uetu" _uuid="00000000-0000-0000-0CDD-B9B0EE8AC52B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d46b-7xee~uetu"><intent_id>494882</intent_id><project_id>680530</project_id><text_data>6461 Little Big Horn Rd, Maple Falls700 NW Crosby Ave #42, Oak Harbor820 N. Oak Harbor St. #52, Oak Harbor2634 N Airline Way, Oak Harbor</text_data><comment_date>2011-12-27T00:00:00</comment_date></row><row _id="row-anqt_2vys~djg5" _uuid="00000000-0000-0000-62E3-96E8CBF3A8CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-anqt_2vys~djg5"><intent_id>750533</intent_id><project_id>786853</project_id><text_data>MMFS Job#76169027</text_data><comment_date>2016-03-09T00:00:00</comment_date></row><row _id="row-nf8k.hhbd.5sj2" _uuid="00000000-0000-0000-27F5-2C0507A182A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nf8k.hhbd.5sj2"><intent_id>684967</intent_id><project_id>750614</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2015-03-23T00:00:00</comment_date></row><row _id="row-uxz5~s87n-77mn" _uuid="00000000-0000-0000-9CD3-708010AE10D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uxz5~s87n-77mn"><intent_id>1217497</intent_id><project_id>957370</project_id><text_data>PC1 Job #4351CB</text_data><comment_date>2022-03-14T00:00:00</comment_date></row><row _id="row-3ndt_verx~i3ue" _uuid="00000000-0000-0000-DE40-8858B52F3EBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ndt_verx~i3ue"><intent_id>583521</intent_id><project_id>716276</project_id><text_data>Our scope of work on the �Edgerton Walking Path 164th St E� project was to string line trim all vegetation 3-5 feet along roadway path. Prune for 7-8 foot height clearance.  Clean up restore area.  This was NOT an installation project. This work was landscape maintenance work and is consistent with WAC 296-127-01346; specifically �� maintaining lawns, yards, gardens or other landscaped surfaces.</text_data><comment_date>2013-07-31T00:00:00</comment_date></row><row _id="row-gsea.utwq-q4m4" _uuid="00000000-0000-0000-B2BE-317AE849E310" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gsea.utwq-q4m4"><intent_id>819554</intent_id><project_id>815085</project_id><text_data>The responsibilities of the general laborer is to uncrate and set in place � no hook ups � commercial kitchen equipment.</text_data><comment_date>2017-03-13T00:00:00</comment_date></row><row _id="row-7kmz-v4mq-cgze" _uuid="00000000-0000-0000-F185-FA8464AEE140" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7kmz-v4mq-cgze"><intent_id>535153</intent_id><project_id>692663</project_id><text_data>Type of Truck: sgl axel, 14 ft covered bedDriver: Driver will drive to site with cabinets</text_data><comment_date>2012-09-18T00:00:00</comment_date></row><row _id="row-bf7z~5bq3-wjxf" _uuid="00000000-0000-0000-8249-BC8D0D310F34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bf7z~5bq3-wjxf"><intent_id>1052324</intent_id><project_id>889609</project_id><text_data>Blythe Job X-308</text_data><comment_date>2020-04-17T00:00:00</comment_date></row><row _id="row-tsch.i6ts_xirr" _uuid="00000000-0000-0000-18D2-DA8442FBCA82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsch.i6ts_xirr"><intent_id>1322615</intent_id><project_id>1065120</project_id><text_data>Ticket #141546</text_data><comment_date>2023-04-26T00:00:00</comment_date></row><row _id="row-d5gh~gb54-3gnt" _uuid="00000000-0000-0000-D3E1-149E2D9CC2E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d5gh~gb54-3gnt"><intent_id>1162256</intent_id><project_id>965450</project_id><text_data>OUR SCOPE OF WORK TO INCLUDE PLANTING OF TREES SHRUBS AND GROUNDCOVER . PLACING TOPSOIL, BARKING AND SODDING FOR BEAUTIFICATION OF PROJECT.</text_data><comment_date>2021-07-21T00:00:00</comment_date></row><row _id="row-bcsy.9bdg.cafe" _uuid="00000000-0000-0000-7A8B-2F2EE54B0E3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bcsy.9bdg.cafe"><intent_id>1233803</intent_id><project_id>1013427</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-06-03T00:00:00</comment_date></row><row _id="row-n4xv-48n3-avh6" _uuid="00000000-0000-0000-ABA4-B95805F8DEDA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n4xv-48n3-avh6"><intent_id>1257843</intent_id><project_id>1019198</project_id><text_data>Yeison Pinto-Owner/operator</text_data><comment_date>2022-08-14T00:00:00</comment_date></row><row _id="row-xkrn_8syk_ziht" _uuid="00000000-0000-0000-C16B-B13061AD6233" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xkrn_8syk_ziht"><intent_id>1154209</intent_id><project_id>967481</project_id><text_data>Installation performed using standard tools including ladders, laser levels, and hand saw.</text_data><comment_date>2021-06-21T00:00:00</comment_date></row><row _id="row-s4hv.ij4g~8n9b" _uuid="00000000-0000-0000-7B31-FC7E29D4A928" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4hv.ij4g~8n9b"><intent_id>788344</intent_id><project_id>799573</project_id><text_data>(23) classrooms remodel.   Audiovisual equipment.</text_data><comment_date>2016-09-09T00:00:00</comment_date></row><row _id="row-ae45~jg3j_urzi" _uuid="00000000-0000-0000-2F6E-0407DD7300EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ae45~jg3j_urzi"><intent_id>760994</intent_id><project_id>791515</project_id><text_data>The other truck is a 3500 gallon water truck.</text_data><comment_date>2016-05-16T00:00:00</comment_date></row><row _id="row-qehf-bm43_24kr" _uuid="00000000-0000-0000-2A36-6C1341181A0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qehf-bm43_24kr"><intent_id>635960</intent_id><project_id>733218</project_id><text_data>Form filed by: AL Morton</text_data><comment_date>2014-06-18T00:00:00</comment_date></row><row _id="row-853z.9jfc.si2u" _uuid="00000000-0000-0000-0007-98AEC9746085" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-853z.9jfc.si2u"><intent_id>722002</intent_id><project_id>772915</project_id><text_data>On 9/11/2015:--Hour wage 38.80 Admin fund .19Pension 7.75LMCC .10health and welfare 9.08App. training .60nebf 1.16nlmcc .01</text_data><comment_date>2015-09-22T00:00:00</comment_date></row><row _id="row-dez3~vghn.h37d" _uuid="00000000-0000-0000-13D9-C2AC52E142C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dez3~vghn.h37d"><intent_id>931965</intent_id><project_id>853215</project_id><text_data>telephone cabling.</text_data><comment_date>2018-09-17T00:00:00</comment_date></row><row _id="row-bwew_jf6s-nfpy" _uuid="00000000-0000-0000-AB3B-E45B7B437262" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bwew_jf6s-nfpy"><intent_id>778890</intent_id><project_id>798469</project_id><text_data>WRS Job #P16-258PW</text_data><comment_date>2016-08-01T00:00:00</comment_date></row><row _id="row-pb4j~ypfv.z7ye" _uuid="00000000-0000-0000-2E0B-402ADDED165B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pb4j~ypfv.z7ye"><intent_id>504249</intent_id><project_id>677011</project_id><text_data>Form filed by: Charles Lundren - murq235</text_data><comment_date>2012-03-16T00:00:00</comment_date></row><row _id="row-g2r8~364u~kbnx" _uuid="00000000-0000-0000-B768-573A59FA61E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g2r8~364u~kbnx"><intent_id>940098</intent_id><project_id>864168</project_id><text_data>Job# 17-787</text_data><comment_date>2018-10-16T00:00:00</comment_date></row><row _id="row-viji_88j2~ipff" _uuid="00000000-0000-0000-1349-51B1AD941C6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-viji_88j2~ipff"><intent_id>638900</intent_id><project_id>736615</project_id><text_data>Routine Maintenance Carpet and Floor Cleaning</text_data><comment_date>2014-07-02T00:00:00</comment_date></row><row _id="row-n6ue.ehdy~d5hf" _uuid="00000000-0000-0000-BEEB-D71B24C35F20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n6ue.ehdy~d5hf"><intent_id>847998</intent_id><project_id>824746</project_id><text_data>1117100</text_data><comment_date>2017-07-17T00:00:00</comment_date></row><row _id="row-z8gu_me6k_fgqx" _uuid="00000000-0000-0000-426C-5C78730413C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z8gu_me6k_fgqx"><intent_id>697292</intent_id><project_id>763455</project_id><text_data>This job requires the higher amt&amp;#39;s between federal wages &amp; State. All wages so far are the same price, except Cement Mason&amp;#39;s in Federal wages which is: base rate of $26.41 + Fringe of $12.44 = $38.85 / Truck Drivers (Dump Truck) Federal wage is: base rate of $24.86 + Fringe of $15.19 = $40.05 / Truck Drivers: (Other Trucks = Water Truck) Federal Wage is: Base Rate $24.75 + Fringe $15.19 = $39.94</text_data><comment_date>2015-05-29T00:00:00</comment_date></row><row _id="row-wppx-zztz~gq4k" _uuid="00000000-0000-0000-093A-56E8FD431D2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wppx-zztz~gq4k"><intent_id>620904</intent_id><project_id>690663</project_id><text_data>Owner, Brad Lang</text_data><comment_date>2014-03-19T00:00:00</comment_date></row><row _id="row-tntp-ac5e-prxx" _uuid="00000000-0000-0000-534A-A6F5B87A3A03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tntp-ac5e-prxx"><intent_id>1087613</intent_id><project_id>932435</project_id><text_data>This intent is to replace legacy intent #1056431 with Aronson Security Group. All intents are being moved over to ADT Commercial LLC effective 6/1/2020 due to acquisition. There were no on-site labor hours for the previous intent prior to the effective date of this intent, so will close out the intent with an affidavit stating no labor hours.</text_data><comment_date>2020-09-14T00:00:00</comment_date></row><row _id="row-fpzg~w4mx-isbs" _uuid="00000000-0000-0000-E37D-DFF4EBA48A62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fpzg~w4mx-isbs"><intent_id>1124723</intent_id><project_id>942463</project_id><text_data>We are an Idaho based business for Industrial Insurance.</text_data><comment_date>2021-02-24T00:00:00</comment_date></row><row _id="row-d7t9.upne-nzay" _uuid="00000000-0000-0000-C343-5A98EFF30958" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7t9.upne-nzay"><intent_id>1227060</intent_id><project_id>1000838</project_id><text_data>122396-001</text_data><comment_date>2022-04-20T00:00:00</comment_date></row><row _id="row-envi-r998~me8i" _uuid="00000000-0000-0000-65D7-07F6BCF27793" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-envi-r998~me8i"><intent_id>825893</intent_id><project_id>817826</project_id><text_data>N 8th St Mount Vernon, WA982731. Air seal, attic blow, wall blow, crawl, mechanical ventilation			2. Single family			3. 1			4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No			5. Yes			6. Yes			7. No			8. No</text_data><comment_date>2017-04-11T00:00:00</comment_date></row><row _id="row-vznr_gtx5_3zyw" _uuid="00000000-0000-0000-BD8F-88D3218C50D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vznr_gtx5_3zyw"><intent_id>583887</intent_id><project_id>716393</project_id><text_data>Form filed by: Carlos A Martinez</text_data><comment_date>2013-07-29T00:00:00</comment_date></row><row _id="row-3q6z.scrb.9huy" _uuid="00000000-0000-0000-595F-B4607BF6FA47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3q6z.scrb.9huy"><intent_id>1180859</intent_id><project_id>981057</project_id><text_data>Other Truck = Water TruckRemoval and replanting of trees and shrubs. Installing decretive edging, install irrigation system. Using both hand and power tools.</text_data><comment_date>2021-09-27T00:00:00</comment_date></row><row _id="row-4fq9-prpw_wux5" _uuid="00000000-0000-0000-38CB-4F23376AFA49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4fq9-prpw_wux5"><intent_id>494734</intent_id><project_id>679257</project_id><text_data>Invoice 410557</text_data><comment_date>2011-12-26T00:00:00</comment_date></row><row _id="row-vqx6.hsuf-k5hs" _uuid="00000000-0000-0000-546F-98C5BEF7A19B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vqx6.hsuf-k5hs"><intent_id>770801</intent_id><project_id>673648</project_id><text_data>haul rock to project with dump truck</text_data><comment_date>2016-07-05T00:00:00</comment_date></row><row _id="row-e4pj_aidj.79pc" _uuid="00000000-0000-0000-2607-A4D6C6BA9F97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e4pj_aidj.79pc"><intent_id>1018275</intent_id><project_id>892980</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. HVAC repairs, replacement, maintenance, and installs.  #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Yes #3 - Including any basement or garage, how many stories or levels does the structure have? One #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No (b) Any retail use in the structure? No (c) Permanent residence only? Yes (d) Rehabilitation house? No (e) Transitional housing? No (f) Communal dining facility? No (g) Treatment services? No (h) Assisted living services? No (I) Dormitories? No (j) Counseling? No (k) Is each room and/or bed in the structure rented separately? No (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? Yes#6 - Does each dwelling unit have its own bathroom? Yes#7 - Is there a community facility or manager�s office on site? No #8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2020-01-23T00:00:00</comment_date></row><row _id="row-pqn7.kzev_iqdp" _uuid="00000000-0000-0000-866C-A04D0708A069" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqn7.kzev_iqdp"><intent_id>1114156</intent_id><project_id>945975</project_id><text_data>This was an emergency work order to help maintenances install iwave air purifiers for 2 elementary schools prior to them opening up days later. This was a requirement to provide clean filtered air to the students returning to school from COVID. We provided NO materials and used only our hands/ screwdriver to install iwave air purifiers.</text_data><comment_date>2021-01-28T00:00:00</comment_date></row><row _id="row-ut3f~2r2i~6sru" _uuid="00000000-0000-0000-3EEA-EF38197F4A2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ut3f~2r2i~6sru"><intent_id>1469360</intent_id><project_id>1146463</project_id><text_data>PTL SO#186116</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-589y.kb29_7dby" _uuid="00000000-0000-0000-1378-6B97F3BDCEC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-589y.kb29_7dby"><intent_id>1486669</intent_id><project_id>1156502</project_id><text_data>Time and materials on call. Troubleshoot controls at WWTP</text_data><comment_date>2024-11-19T00:00:00</comment_date></row><row _id="row-ygwg_mzzk.apt7" _uuid="00000000-0000-0000-B753-45AEA7F335F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ygwg_mzzk.apt7"><intent_id>1049478</intent_id><project_id>914666</project_id><text_data>K &amp; N Motors, Inc. will be performing administrative duties, and machining the shaft. About 6 man hours will be needed in the machining operation at location 415 N Fancher, Spokane, WA. The machining process is called turning.  Turning involves rotation of the shaft while the cutting tool moves in a linear motion, using a lathe. Sub contractor, Industrial Support Service,  will travel to site, Washington State University, 412 E Spokane Fall Blvd, Spokane, WA using a � ton service truck. Install a new fan shaft and bearings on fan. Once the parts are installed Industrial Support Service will balance the assembled item with an electronic balancing machine.</text_data><comment_date>2020-04-06T00:00:00</comment_date></row><row _id="row-xrnp-76kz-2xzc" _uuid="00000000-0000-0000-80F5-E7E2720BFAE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xrnp-76kz-2xzc"><intent_id>1003322</intent_id><project_id>891698</project_id><text_data>#1.  We will remove the old gas water heater and install a new 50 gallon high efficiency electric water heater.#2.  Single Family Dwelling#3.  Single level home#4a.  No#4b.  No#4c.  Yes#4d.  No#4e.  No#4f.  No#4g.  No#4h.  No#4i.  No#4j.  No#4k.  No#4l.  No#5.  One kitchen used by one family#6.  Yes#7.  No#8.  No</text_data><comment_date>2019-08-28T00:00:00</comment_date></row><row _id="row-viwi~imin-wfhn" _uuid="00000000-0000-0000-2188-968AA3FAD589" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-viwi~imin-wfhn"><intent_id>926264</intent_id><project_id>673648</project_id><text_data>Hauling of materials.</text_data><comment_date>2018-08-16T00:00:00</comment_date></row><row _id="row-uzqj.8gd4-xnmb" _uuid="00000000-0000-0000-F840-4A76B8F5B67A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzqj.8gd4-xnmb"><intent_id>1169562</intent_id><project_id>972843</project_id><text_data>Johansen Job #2021-008CWA Agreement project</text_data><comment_date>2021-08-16T00:00:00</comment_date></row><row _id="row-5iey.tc6t_9gdc" _uuid="00000000-0000-0000-BED1-1A9B37822EBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5iey.tc6t_9gdc"><intent_id>489094</intent_id><project_id>678182</project_id><text_data>Annual fire sprinkler inspections at various Clark Co. building locations. 33-3898</text_data><comment_date>2011-11-14T00:00:00</comment_date></row><row _id="row-nkyh.y2a3_2ekx" _uuid="00000000-0000-0000-DDAC-42BE145788CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nkyh.y2a3_2ekx"><intent_id>883991</intent_id><project_id>841747</project_id><text_data>1.Kitchen and bathroom cabinet and countertop replacement 2.Apt 3.3 4.a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no l.n/a 5.yes 6.yes 7.yes 8.no</text_data><comment_date>2018-01-18T00:00:00</comment_date></row><row _id="row-mp6p_cahw-r9p8" _uuid="00000000-0000-0000-FA7B-C87DC0BC5749" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mp6p_cahw-r9p8"><intent_id>661018</intent_id><project_id>745767</project_id><text_data>100% Owner/Operator. No employees. Duct sealing only.</text_data><comment_date>2014-10-20T00:00:00</comment_date></row><row _id="row-7qsf-3p64-n4u4" _uuid="00000000-0000-0000-5179-F843269E40A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7qsf-3p64-n4u4"><intent_id>663395</intent_id><project_id>747881</project_id><text_data>System Type:  LAN/DATATelecom Tech (09) Cat-6 Cabling for High SchoolInside Work</text_data><comment_date>2014-10-31T00:00:00</comment_date></row><row _id="row-ziv9.32am~48n4" _uuid="00000000-0000-0000-D42F-0D22930A2663" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ziv9.32am~48n4"><intent_id>1271346</intent_id><project_id>1014478</project_id><text_data>3001952-9003</text_data><comment_date>2022-10-03T00:00:00</comment_date></row><row _id="row-zudr-z2ss~j4q9" _uuid="00000000-0000-0000-5149-5152D9107FCC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zudr-z2ss~j4q9"><intent_id>641927</intent_id><project_id>739655</project_id><text_data>We will be pulling/grubbing blackberries by hand. hand spray blackberries and other weeds.  pull weed from around plants.</text_data><comment_date>2014-07-17T00:00:00</comment_date></row><row _id="row-8r5h~ti55~cwip" _uuid="00000000-0000-0000-3BBB-1FE12EDBC739" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8r5h~ti55~cwip"><intent_id>1021070</intent_id><project_id>884482</project_id><text_data>3 axle tractors, 48' flatbed trailers</text_data><comment_date>2019-11-11T00:00:00</comment_date></row><row _id="row-44qa~82ah.7ncg" _uuid="00000000-0000-0000-B512-66CD8FB37E07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-44qa~82ah.7ncg"><intent_id>977184</intent_id><project_id>880841</project_id><text_data>Install network to floor box in ws1194b</text_data><comment_date>2019-05-14T00:00:00</comment_date></row><row _id="row-8eqk_braz~bdri" _uuid="00000000-0000-0000-69D0-AE446FEB689E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8eqk_braz~bdri"><intent_id>624461</intent_id><project_id>732402</project_id><text_data>044054</text_data><comment_date>2014-04-11T00:00:00</comment_date></row><row _id="row-rgjz_gpfj~chvm" _uuid="00000000-0000-0000-B5C9-28901DD5662D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rgjz_gpfj~chvm"><intent_id>1270783</intent_id><project_id>1033278</project_id><text_data>IFS WO# 128921, City of Bellevue, COB 16280 turnaround per Seth Mattox</text_data><comment_date>2022-09-29T00:00:00</comment_date></row><row _id="row-vg92.usvk_nqvn" _uuid="00000000-0000-0000-F32E-B73B62832697" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vg92.usvk_nqvn"><intent_id>821253</intent_id><project_id>815849</project_id><text_data>000504-136-00</text_data><comment_date>2017-03-16T00:00:00</comment_date></row><row _id="row-t9ep-7fz9~wa6y" _uuid="00000000-0000-0000-DE4F-47387B382F1F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9ep-7fz9~wa6y"><intent_id>606728</intent_id><project_id>724841</project_id><text_data>True of each of the jobs listed above (In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions in the notes section at the bottom of this screen:)1) Add bathroom fans and timers (provide rigid ducting), some electrical misc. repairs2) Single Family and Mobile Homes (Factory Assembled Structure)3) All are single or two story, one had a basement4a) No4b) No4c) Yes4d) No4e) No4f) No4g) No4h) No4i) No4j) No4k) N/A5) Yes6) Yes7) 3 addresses at 1505 S Road 40 East (Lakeview Mobile Home Park) have manager's office)8) No</text_data><comment_date>2013-12-02T00:00:00</comment_date></row><row _id="row-m7bw.uyvm_yqjz" _uuid="00000000-0000-0000-0A86-8CFBFAFC5DD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7bw.uyvm_yqjz"><intent_id>635325</intent_id><project_id>737194</project_id><text_data>Form filed by: Alex Yuckert</text_data><comment_date>2014-06-16T00:00:00</comment_date></row><row _id="row-eaqk.zmzt-c8ne" _uuid="00000000-0000-0000-864E-2F85B7F0B809" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eaqk.zmzt-c8ne"><intent_id>1170152</intent_id><project_id>975520</project_id><text_data>Preconstruction Phase Only</text_data><comment_date>2021-08-18T00:00:00</comment_date></row><row _id="row-jzfx-6buv-c2p4" _uuid="00000000-0000-0000-93D0-2A262C342EC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzfx-6buv-c2p4"><intent_id>1085379</intent_id><project_id>931437</project_id><text_data>#1-Install heat pump; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2020-09-02T00:00:00</comment_date></row><row _id="row-ytk8_x2du.g9xz" _uuid="00000000-0000-0000-78D8-C65E2EBE70EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ytk8_x2du.g9xz"><intent_id>1202834</intent_id><project_id>994016</project_id><text_data>ORDER 427564</text_data><comment_date>2022-01-05T00:00:00</comment_date></row><row _id="row-rc6s-ab44-cg2w" _uuid="00000000-0000-0000-6589-B2AF738BD34C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rc6s-ab44-cg2w"><intent_id>648012</intent_id><project_id>679930</project_id><text_data>TELECOMM TECH:Provide labor and materials to install (3) Cat 6 (2071) cables from 2nd floor MDF to (45) work area locations.Provide labor and materials to install (1) Cat 6 (2071) cable from 2nd floor MDF to (3) WAP locations.Test and label all cables.Provide labor and materials to install (1) RG-6 coax cable from 3rd floor riser to (2) locations.Test and label all cables.Provide labor and materials to install 18� cable tray in 2nd floor closet.Provide labor and materials to install (8) switchpaks from Visipatch wall field to switch location on rack.Test and label all cables.Provide (150) 7� 4-pair Visipatch patch cords, (10) 7� 1-pair Visipatch patch cords and (10)10� 1-pair Visipatch patch cords.WORK TO TAKE PLACE ON 2ND AND 3RD FLOOR OF INSIDE OF KING COUNTY ADMIN BUILDING. ? Permit and inspection included</text_data><comment_date>2014-08-14T00:00:00</comment_date></row><row _id="row-ci64.9fjh~wrx3" _uuid="00000000-0000-0000-E526-9AACF353473A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ci64.9fjh~wrx3"><intent_id>711368</intent_id><project_id>768821</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2015-08-06T00:00:00</comment_date></row><row _id="row-jm5w-5ehg-jezm" _uuid="00000000-0000-0000-9A49-AEA2872FAE50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jm5w-5ehg-jezm"><intent_id>755242</intent_id><project_id>788411</project_id><text_data>Work will construct ADA compliant shared paths at Exit 49.  Work will consist of excavation, grading, concrete and asphalt work, landscaping, signing and illumination.  C&amp;R will be hydroseeding approx. 350 sy with a hydrostatic seeder, installing 40cy of topsoil brought in with a dump truck or a CAD truck.  Landscaping will be done to repair any property damage done.</text_data><comment_date>2016-04-06T00:00:00</comment_date></row><row _id="row-vp7v~2dmd~s89k" _uuid="00000000-0000-0000-B47A-31AF2B0F846A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vp7v~2dmd~s89k"><intent_id>608437</intent_id><project_id>693440</project_id><text_data>$16.17 IBEW Local 280 Fringe= $0.05(COPE)+ $0.10(LLMC)+ $0.75(TRAINING)+ $4.25(CASCADE)+ $1.78(DIST 9 ER)+ $7.95(H&amp;W)+ $1.29(NEBF) = $16.17$19.07 IBEW LOCAL 48 Fringe= $0.20(BLMCC)+ $0.82(MRP DUES)+ $0.60(TRAINING)+ $1.20(FLEX)+ $3.42(DIST 9)+ $3.65(ELISON PENSION)+ $7.95(H&amp;W)+ $1.23(NEBF) = $19.07</text_data><comment_date>2013-12-26T00:00:00</comment_date></row><row _id="row-x8ga-rb7r.ar8x" _uuid="00000000-0000-0000-6650-81211D519EF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x8ga-rb7r.ar8x"><intent_id>739711</intent_id><project_id>780355</project_id><text_data>Other trucks is a water truck under 8,000 gallons</text_data><comment_date>2016-01-15T00:00:00</comment_date></row><row _id="row-hd2t~pt54_ripk" _uuid="00000000-0000-0000-D64A-BB9FC581ECD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hd2t~pt54_ripk"><intent_id>871220</intent_id><project_id>808749</project_id><text_data>We are an Idaho based company for Industrial Insurance.</text_data><comment_date>2017-10-25T00:00:00</comment_date></row><row _id="row-ubxv-qe28-hrtm" _uuid="00000000-0000-0000-295F-91CD97A652CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ubxv-qe28-hrtm"><intent_id>607003</intent_id><project_id>724953</project_id><text_data>Restoration Logistics will be removing Purple Loosestrife from within the project boundaries by hand and removing the pulled materials and taking them to an appropriate disposal site. All work will be completed by hand using only hand tools.</text_data><comment_date>2013-12-04T00:00:00</comment_date></row><row _id="row-bde6.edpd_a9z4" _uuid="00000000-0000-0000-9FF6-223A7979B606" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bde6.edpd_a9z4"><intent_id>529080</intent_id><project_id>691958</project_id><text_data>Fringe = Annuity $4.00, Pension $9.20, Health and welfare $6.77, Impact fees (union) $.28, Apprenticeship (union) $.63, and industry (union) $.01</text_data><comment_date>2012-08-22T00:00:00</comment_date></row><row _id="row-dapk_wcim~i6mr" _uuid="00000000-0000-0000-F22E-EA59F3EF0184" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dapk_wcim~i6mr"><intent_id>937729</intent_id><project_id>863256</project_id><text_data>LONG 5050.180281</text_data><comment_date>2018-10-04T00:00:00</comment_date></row><row _id="row-h9mb_wtbp_dmdh" _uuid="00000000-0000-0000-83E7-C717F09B50EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h9mb_wtbp_dmdh"><intent_id>703205</intent_id><project_id>765828</project_id><text_data>job was through CCDCD weatherization. Job was service call. SSF no other information</text_data><comment_date>2015-06-24T00:00:00</comment_date></row><row _id="row-w363.k6bg-uabd" _uuid="00000000-0000-0000-E13B-43559546DD4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w363.k6bg-uabd"><intent_id>1465831</intent_id><project_id>1140627</project_id><text_data>1.Weatherization 2. single family 3. 1 4.a0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-exv6.w7c8_miqg" _uuid="00000000-0000-0000-D837-6CDD446D8F7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-exv6.w7c8_miqg"><intent_id>469495</intent_id><project_id>671348</project_id><text_data>I removed the Clean Up Laborer as you requested.  I also removed the Hazardous Waste Worker, Level C, since our company does not work with the Hazardous materials and replaced it with the General Laborer 'Occupation' after I had reviewed an Intent / Affidavit that had been approved, but was not a residential site.</text_data><comment_date>2011-08-31T00:00:00</comment_date></row><row _id="row-ccvc_757t.esks" _uuid="00000000-0000-0000-09AD-F21167F8F46C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ccvc_757t.esks"><intent_id>622047</intent_id><project_id>731771</project_id><text_data>No fringe benefits.  Spoke with rep over the phone and &amp;quot;health care allowance&amp;quot; does not count as fringe.</text_data><comment_date>2014-03-26T00:00:00</comment_date></row><row _id="row-wfrx.rmcs~9fg5" _uuid="00000000-0000-0000-1F49-A6A187DE698E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wfrx.rmcs~9fg5"><intent_id>1234860</intent_id><project_id>1013986</project_id><text_data>Centralia High School813 Eshom RdCentralia, WA 98531-1515Invoice 35421395</text_data><comment_date>2022-05-19T00:00:00</comment_date></row><row _id="row-y5my-w2ds.qvam" _uuid="00000000-0000-0000-D91D-115851890EFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5my-w2ds.qvam"><intent_id>589106</intent_id><project_id>718274</project_id><text_data>General Laborer: Performs work of shoveling with a hand shovel, cleaning-sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket.Other Trucks: A Low Boy trailer for delivery and pick up of equipment</text_data><comment_date>2013-08-21T00:00:00</comment_date></row><row _id="row-wmuz-98ru_sfjb" _uuid="00000000-0000-0000-939B-00AEF02D0E7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wmuz-98ru_sfjb"><intent_id>639473</intent_id><project_id>736767</project_id><text_data>Trucks Other - Water Truck used for dust cotrol</text_data><comment_date>2014-07-10T00:00:00</comment_date></row><row _id="row-bkcu.8ft2-gjx4" _uuid="00000000-0000-0000-078D-7EFAA7605B5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bkcu.8ft2-gjx4"><intent_id>748912</intent_id><project_id>782887</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2016-02-29T00:00:00</comment_date></row><row _id="row-5g4b_sydu_cdve" _uuid="00000000-0000-0000-4182-81EBB3D56B14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5g4b_sydu_cdve"><intent_id>781599</intent_id><project_id>799504</project_id><text_data>Project to take place at multiple locations</text_data><comment_date>2016-08-11T00:00:00</comment_date></row><row _id="row-pg46-rhwx_sfww" _uuid="00000000-0000-0000-8ABD-ADD2DD23208A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pg46-rhwx_sfww"><intent_id>796885</intent_id><project_id>805282</project_id><text_data>General Laborer - Cleanup Guano in Exhaust Fan on roof of fine arts building. Materials, Regs, Bags, HEPA Vac Scrubbies, Hudson sprayer, electrical Cords.</text_data><comment_date>2016-10-20T00:00:00</comment_date></row><row _id="row-ueei~6dx7.i25b" _uuid="00000000-0000-0000-D8EF-E71B30843109" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ueei~6dx7.i25b"><intent_id>1233468</intent_id><project_id>870216</project_id><text_data>Work performed by the Telecommunication Technicians is to test and/or troubleshoot of pre-existing copper cable. POWERCOM JOB #550195</text_data><comment_date>2022-05-13T00:00:00</comment_date></row><row _id="row-mwgp_is6p_cqku" _uuid="00000000-0000-0000-5A25-DF199AD625D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mwgp_is6p_cqku"><intent_id>458687</intent_id><project_id>663016</project_id><text_data>Hourly Fringe Breakdown:Annuity:  $ 4.00Pension:  $ 8.95H &amp; W  :  $ 6.02Impact :  $  .25Appr   :  $  .63Industry: $  .01Total:    $19.86</text_data><comment_date>2011-07-12T00:00:00</comment_date></row><row _id="row-xgch.atwf-qr3x" _uuid="00000000-0000-0000-8C25-6AF066F8BF98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xgch.atwf-qr3x"><intent_id>710849</intent_id><project_id>768628</project_id><text_data>Job Order Contract RTA/CN 0008-13, Contract Purchase Order No. 141074 OBWork Order No. 056 - 151406 ODSound Transit</text_data><comment_date>2015-07-29T00:00:00</comment_date></row><row _id="row-tdgc_wzuc_s7bq" _uuid="00000000-0000-0000-2142-A8D961B58DB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tdgc_wzuc_s7bq"><intent_id>1087229</intent_id><project_id>932271</project_id><comment_date>2020-09-11T00:00:00</comment_date></row><row _id="row-kqdh_vwfc~tgg6" _uuid="00000000-0000-0000-EF7F-6F751F5E158E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kqdh_vwfc~tgg6"><intent_id>852799</intent_id><project_id>829182</project_id><text_data>Order 812788</text_data><comment_date>2017-08-04T00:00:00</comment_date></row><row _id="row-rp39-2t95~863x" _uuid="00000000-0000-0000-4042-1025E9265753" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rp39-2t95~863x"><intent_id>719577</intent_id><project_id>757164</project_id><text_data>Whole project is to install new school portables. My portion is to correct flooring problems for carpet installers, repair drywall damage, paint and install new trim as needed. General laborers will be helping apply floor leveling cement, removing screws, installing new screws, and keeping job site clean. hand tools, scrapers, screw drivers.</text_data><comment_date>2015-10-08T00:00:00</comment_date></row><row _id="row-xqkb-m88g~hhar" _uuid="00000000-0000-0000-9FDE-0BC0A89C74B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xqkb-m88g~hhar"><intent_id>932283</intent_id><project_id>861228</project_id><text_data>#20163, Foubert, Cathleen, 25505 E Wellesley Ave, Newman Lake</text_data><comment_date>2018-09-13T00:00:00</comment_date></row><row _id="row-ywda-m8jt~g45a" _uuid="00000000-0000-0000-0A79-9EC5D64AB2F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ywda-m8jt~g45a"><intent_id>790970</intent_id><project_id>803091</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2016-09-21T00:00:00</comment_date></row><row _id="row-x4ch-hss5.jkur" _uuid="00000000-0000-0000-8866-D8440128A7B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x4ch-hss5.jkur"><intent_id>869056</intent_id><project_id>814514</project_id><text_data>owner operator driving dumptruck</text_data><comment_date>2017-10-14T00:00:00</comment_date></row><row _id="row-aqa7-yp6j_zz36" _uuid="00000000-0000-0000-EC8B-C0A2171C10EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aqa7-yp6j_zz36"><intent_id>990736</intent_id><project_id>886789</project_id><text_data>09-19-052R</text_data><comment_date>2019-07-10T00:00:00</comment_date></row><row _id="row-ncy7_ipz5~mnp8" _uuid="00000000-0000-0000-E83C-7ABE66BDDEA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ncy7_ipz5~mnp8"><intent_id>1291787</intent_id><project_id>1046060</project_id><text_data>1014186</text_data><comment_date>2022-12-22T00:00:00</comment_date></row><row _id="row-qp9g-p4v7.2g62" _uuid="00000000-0000-0000-E935-DCC27295638C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qp9g-p4v7.2g62"><intent_id>935988</intent_id><project_id>862583</project_id><text_data>Employees drive either a 2500 or a 3500 Chevy Silverado to and from the job site. This work was annual preventative maintenance, change oil, oil filter, fuel filter, preform battery test, 27 point inspection and transfer test. Sub-Contractors will perform electrical work.</text_data><comment_date>2018-09-27T00:00:00</comment_date></row><row _id="row-xwm9~qbn7_uz9n" _uuid="00000000-0000-0000-91A6-E5A57BDEB198" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xwm9~qbn7_uz9n"><intent_id>783338</intent_id><project_id>800164</project_id><text_data>We are an Oregon company with a worker&amp;#39;s comp policy through SAIF #441099.</text_data><comment_date>2016-08-18T00:00:00</comment_date></row><row _id="row-hziz~uiy2.7z44" _uuid="00000000-0000-0000-DA08-EDD8E16FEF74" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hziz~uiy2.7z44"><intent_id>1095989</intent_id><project_id>936308</project_id><text_data>Adler project 83460002</text_data><comment_date>2020-10-14T00:00:00</comment_date></row><row _id="row-mtr3-pbke-qveg" _uuid="00000000-0000-0000-DF58-386B2CF78448" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mtr3-pbke-qveg"><intent_id>449769</intent_id><project_id>662915</project_id><text_data>Industrial Insurance Account Id: 889,752-00</text_data><comment_date>2011-04-12T00:00:00</comment_date></row><row _id="row-fvp9.uyjs.2rgb" _uuid="00000000-0000-0000-632B-DC51E752620F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fvp9.uyjs.2rgb"><intent_id>795004</intent_id><project_id>804600</project_id><text_data>Wells Dam is in between Chelan &amp; Pateros</text_data><comment_date>2016-10-10T00:00:00</comment_date></row><row _id="row-tgck~x9ty-7szs" _uuid="00000000-0000-0000-4E6A-38AAD8AF0F14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tgck~x9ty-7szs"><intent_id>964181</intent_id><project_id>875085</project_id><text_data>Service Call 190211-0022</text_data><comment_date>2019-03-08T00:00:00</comment_date></row><row _id="row-84hu.hej7.z94b" _uuid="00000000-0000-0000-2E82-344C058072E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-84hu.hej7.z94b"><intent_id>611380</intent_id><project_id>727051</project_id><text_data>The scope of work for this project is ongoing landscape maintenance to include mowing, manual weeding, pruning, raking bed areas, removal of all resulting debris.  This site is part of a route and debris from this site is accumulated along the route to other job sites.</text_data><comment_date>2014-01-09T00:00:00</comment_date></row><row _id="row-ngb9.zjnb~7kx3" _uuid="00000000-0000-0000-D794-E73BC519B9DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ngb9.zjnb~7kx3"><intent_id>804865</intent_id><project_id>808321</project_id><text_data>3167297</text_data><comment_date>2016-11-30T00:00:00</comment_date></row><row _id="row-i9wz_49zb-qgwk" _uuid="00000000-0000-0000-996A-90B3C9032B53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9wz_49zb-qgwk"><intent_id>1010584</intent_id><project_id>831273</project_id><text_data>Racking of soil and prepping for hydroseed for landscape renovation.</text_data><comment_date>2019-09-27T00:00:00</comment_date></row><row _id="row-uevk~qdsy~e7y4" _uuid="00000000-0000-0000-78CA-7F2376485D56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uevk~qdsy~e7y4"><intent_id>1179411</intent_id><project_id>980292</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION BUNDLE OF 10 PROJECTS. THEY ARE ALL SINGLE FAMILY, RESIDENTIAL DWELLINGS. 209 W 10TH AVE, ELLENSBURG   102 W 1ST AVE, KITTITAS   1020 MCDONALD RD #5, CLE ELUM    670 COYOTE RUN RD, ELLENSBURG</text_data><comment_date>2021-09-21T00:00:00</comment_date></row><row _id="row-ivzd-c62m_b629" _uuid="00000000-0000-0000-4878-B7C9ED27F914" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ivzd-c62m_b629"><intent_id>1006412</intent_id><project_id>892958</project_id><comment_date>2019-10-01T00:00:00</comment_date></row><row _id="row-sqde.8spq~6ys4" _uuid="00000000-0000-0000-CB20-8A1AA7D6650B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqde.8spq~6ys4"><intent_id>1011455</intent_id><project_id>894975</project_id><text_data>General labor consists of site protection, cleanup and help move material</text_data><comment_date>2019-10-02T00:00:00</comment_date></row><row _id="row-ti6r-7m4f_e4zk" _uuid="00000000-0000-0000-8A63-C1527F9C4114" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ti6r-7m4f_e4zk"><intent_id>712215</intent_id><project_id>762404</project_id><text_data>Laborers will be doing tasks for select demolition.  Sweeping, loading dumpsters, shoveling, water hoses etc.</text_data><comment_date>2015-08-05T00:00:00</comment_date></row><row _id="row-8av2~7adb-f2ni" _uuid="00000000-0000-0000-2FC6-07B84FE01EE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8av2~7adb-f2ni"><intent_id>459415</intent_id><project_id>666877</project_id><text_data>THE CONTACT AT THE AWARDING AGENCY IS JOE SHONES.  PHONE # 509-785-5081</text_data><comment_date>2011-06-17T00:00:00</comment_date></row><row _id="row-5caa_7wc7~s35b" _uuid="00000000-0000-0000-1348-77073623C712" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5caa_7wc7~s35b"><intent_id>636205</intent_id><project_id>735471</project_id><text_data>We pay 100% of Employees Health Care as Benefit.</text_data><comment_date>2014-06-19T00:00:00</comment_date></row><row _id="row-9bs2_s3u2-2j3s" _uuid="00000000-0000-0000-9ECB-3B8C9BFC1DB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9bs2_s3u2-2j3s"><intent_id>845573</intent_id><project_id>826363</project_id><text_data>Craft/Trade/Occupation notes contained on form: General Labor (tank decommissioning &amp; cleaning with rags &amp; absorbent)</text_data><comment_date>2017-08-11T00:00:00</comment_date></row><row _id="row-curk_n7if-a8g2" _uuid="00000000-0000-0000-87E4-22D6F6DF9D2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-curk_n7if-a8g2"><intent_id>857481</intent_id><project_id>830564</project_id><text_data>01-JM02-JO</text_data><comment_date>2017-08-22T00:00:00</comment_date></row><row _id="row-mg8c~zt6r_x7gh" _uuid="00000000-0000-0000-F700-4E59393DD626" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mg8c~zt6r_x7gh"><intent_id>1469290</intent_id><project_id>1100970</project_id><text_data>PCI Scaffold 404 (24-07997) sub to PCI Interiors 552</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-ckjh.sbay_f45x" _uuid="00000000-0000-0000-2296-6CE0E76FCD2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ckjh.sbay_f45x"><intent_id>1497683</intent_id><project_id>1163049</project_id><text_data>White River SD 304399</text_data><comment_date>2024-12-30T00:00:00</comment_date></row><row _id="row-eqjp.eyt5.vspw" _uuid="00000000-0000-0000-E91C-7CBCECEB2C91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eqjp.eyt5.vspw"><intent_id>1492647</intent_id><project_id>1159867</project_id><text_data>Mounting, by means of screws, core network equipment (switches) to existing telecommunications racks, indoors.</text_data><comment_date>2024-12-05T00:00:00</comment_date></row><row _id="row-2jmk-nmzg_jg9m" _uuid="00000000-0000-0000-E07D-8E30696336B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2jmk-nmzg_jg9m"><intent_id>594928</intent_id><project_id>720425</project_id><text_data>Questions to be answered by contractor who states work is not covered:Prevailing wage issues are very fact specific. In order for us to evaluate if the work to be performed by your worker(s) is not covered for the Highline Water District Pump Station #6 project, we need to know more about the project and the tasks your employees perform in conjunction with this project. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc.The purpose of this project was to respond to an emergency call to determine why the main circuit breaker at Pump Station #6 in SeaTac had tripped. The emergency generator had been running for most of the Labor Day Holiday weekend. 2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)] No.	3.) Does this project entail the remodeling or new construction of a facility? No. 4.) If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.The pump station main electrical distribution switchboard.5.) What specific tasks will your employees perform? Test the main circuit breaker.   6.) Will your employees work require the physical modification to the electrical system wiring including connection and disconnection, temporary or permanent?The work performed by Electrical Reliability Services, Inc. only included testing the main circuit breaker. Based upon our test results, we determined that the circuit breaker was defective. We purchased a new circuit breaker and after we tested it, had it installed by Cunningham Electric Company.7.) Will your employees require the use of a screwdriver, wrench, or any other handheld tool besides a multimeter?No. 8) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? No. Cunningham Electric personnel performed the installation.9) Will your employees perform any work that requires an electrical license or certification under Chapter 296-46B WAC?No.10) Are you going to be hiring any subcontractors for this project?Yes. Cunningham Electric Company was hired.</text_data><comment_date>2013-09-19T00:00:00</comment_date></row><row _id="row-9t8k-rgu7~emia" _uuid="00000000-0000-0000-E3AC-D3BB46989DB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9t8k-rgu7~emia"><intent_id>943752</intent_id><project_id>850526</project_id><text_data>This project is exempt from the payment of state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101.</text_data><comment_date>2018-11-26T00:00:00</comment_date></row><row _id="row-9i5f_kv7s.szut" _uuid="00000000-0000-0000-902E-FDD7E2777AD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9i5f_kv7s.szut"><intent_id>616982</intent_id><project_id>729445</project_id><text_data>#1 - Heating duct sealing. #2 - Single family manufactured home? #3 - 1 level? #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2014-02-19T00:00:00</comment_date></row><row _id="row-kwyn.ytyz~ntje" _uuid="00000000-0000-0000-C1D0-4394E8FA0AF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kwyn.ytyz~ntje"><intent_id>666492</intent_id><project_id>710976</project_id><text_data>&amp;quot;TRUCK DRIVER OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER (DAVIS BACON = TRUCK OPERATOR: BROOM) AND/OR 2000-4000 GALLON WATER TRUCK; &amp;quot;POWER EQUIPMENT OPERATOR MOTOR PATROL GRADER FINISHER&amp;quot; - NOT MOTOR PATROL, VACTOR GUZZLER/VACCON SUPER SUCKER</text_data><comment_date>2014-11-19T00:00:00</comment_date></row><row _id="row-2j9b_42qp_7b5e" _uuid="00000000-0000-0000-CCE0-58AFA671980B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2j9b_42qp_7b5e"><intent_id>867901</intent_id><project_id>834638</project_id><text_data>#1 Remodeling bathroom; #2 single family dwelling; #3 1 story; #4 (a) no; (b) no; (c) yes; (d) no; (e) no; (f) no; (g) no; (h) no; (i) no; (j) no; (k) no; (l) none; #5 n/a; #6 n/a; #7 n/a; #8 no</text_data><comment_date>2017-10-09T00:00:00</comment_date></row><row _id="row-fmmq~mrhj_hrjb" _uuid="00000000-0000-0000-9335-26CBC74521D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fmmq~mrhj_hrjb"><intent_id>987892</intent_id><project_id>885697</project_id><text_data>1: Replace Hot water tank 2: Single 3: One level 4: A-No//B-No//C-Yes//D-No//E-No//F-No//G-No//H-No//I-No//J-No//K-NO5:Yes 6:Yes 7:No 8:No</text_data><comment_date>2019-06-26T00:00:00</comment_date></row><row _id="row-gu6i.dkyy~mide" _uuid="00000000-0000-0000-C137-D0F662A1B3B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gu6i.dkyy~mide"><intent_id>825336</intent_id><project_id>816963</project_id><text_data>HC Job# 4028</text_data><comment_date>2017-04-07T00:00:00</comment_date></row><row _id="row-7hzm~knj2_krpy" _uuid="00000000-0000-0000-18F6-60CAF0745AA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7hzm~knj2_krpy"><intent_id>948385</intent_id><project_id>867652</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2018-12-03T00:00:00</comment_date></row><row _id="row-encm.3dr6_ibpg" _uuid="00000000-0000-0000-825A-B18EF42516C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-encm.3dr6_ibpg"><intent_id>932511</intent_id><project_id>859478</project_id><text_data>0318053</text_data><comment_date>2018-09-13T00:00:00</comment_date></row><row _id="row-k5bq_jbyn~stgk" _uuid="00000000-0000-0000-4267-C7AEBD254986" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k5bq_jbyn~stgk"><intent_id>1146659</intent_id><project_id>910300</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a - no; 4b - no; 4c - yes; 4d - no; 4e - no; 4f - no; 4g - no; 4h - no; 4i - no; 4j - no; 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2021-05-21T00:00:00</comment_date></row><row _id="row-4s9a.9wuv~shzh" _uuid="00000000-0000-0000-3E4B-BC59EBA123EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4s9a.9wuv~shzh"><intent_id>981357</intent_id><project_id>882665</project_id><text_data>WB RT # 4918102; Kickoff RT # 5143091</text_data><comment_date>2019-05-30T00:00:00</comment_date></row><row _id="row-g4kx-dcgh.9q7m" _uuid="00000000-0000-0000-4820-0F842A001872" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g4kx-dcgh.9q7m"><intent_id>1104002</intent_id><project_id>940290</project_id><text_data>Other trucks consist of one (1) 0-8,000 gallon water truck used to help with compaction and for dust abatement, as needed.</text_data><comment_date>2020-11-24T00:00:00</comment_date></row><row _id="row-hih4.rpz2_v6fp" _uuid="00000000-0000-0000-B0EE-120198F2F337" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hih4.rpz2_v6fp"><intent_id>917925</intent_id><project_id>855887</project_id><text_data>S027624</text_data><comment_date>2018-07-13T00:00:00</comment_date></row><row _id="row-73da-weyg-ehms" _uuid="00000000-0000-0000-A111-66416F23C0F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73da-weyg-ehms"><intent_id>1290012</intent_id><project_id>1012903</project_id><text_data>JCI Project # 650246955 MSD Challenger ES Add &amp; reno - Garrett Adkins, PM - Lyle Fortin, Sales</text_data><comment_date>2022-12-14T00:00:00</comment_date></row><row _id="row-3h3a_wkuv-aj8z" _uuid="00000000-0000-0000-CE0C-0AF167EFA0FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3h3a_wkuv-aj8z"><intent_id>1014922</intent_id><project_id>890281</project_id><text_data>Everything was marked and ready for employee (landscape maintenance) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used</text_data><comment_date>2019-10-11T00:00:00</comment_date></row><row _id="row-xyg6~gw7v.wtps" _uuid="00000000-0000-0000-BB72-47745AE74C40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xyg6~gw7v.wtps"><intent_id>1024150</intent_id><project_id>900686</project_id><text_data>Service Call 191101-0001</text_data><comment_date>2019-11-27T00:00:00</comment_date></row><row _id="row-a3az-bec6.g3wv" _uuid="00000000-0000-0000-9CBB-8E62CF2538E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a3az-bec6.g3wv"><intent_id>672470</intent_id><project_id>752018</project_id><text_data>remove and replace kitchen cabinets and countertops in a unit in a 3 story apartment complex, no basement or garage, permanent residence only, no rehab, no transitional housing, no communal dining, no treatment services, no counseling, each unit has its own kitchen and bath. managers office on site, no public use, no retail or commercial</text_data><comment_date>2015-01-07T00:00:00</comment_date></row><row _id="row-23ac.g8ye-bddp" _uuid="00000000-0000-0000-18EA-E805F44AA255" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-23ac.g8ye-bddp"><intent_id>823093</intent_id><project_id>816652</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. HVAC repair#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? yes #3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No (b) Any retail use in the structure? No (c) Permanent residence only? Yes (d) Rehabilitation house? No (e) Transitional housing? No (f) Communal dining facility? No (g) Treatment services? No (h) Assisted living services? No (I) Dormitories? No (j) Counseling? No (k) Is each room and/or bed in the structure rented separately? No (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? Yes #6 - Does each dwelling unit have its own bathroom?  Yes#7 - Is there a community facility or manager�s office on site? No#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2017-03-28T00:00:00</comment_date></row><row _id="row-8zc9-9ng9_4w5r" _uuid="00000000-0000-0000-7B65-AD10BA9D8EB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zc9-9ng9_4w5r"><intent_id>628761</intent_id><project_id>733754</project_id><text_data>074031</text_data><comment_date>2014-05-08T00:00:00</comment_date></row><row _id="row-48zp-bdpe-xpt5" _uuid="00000000-0000-0000-B4C5-D5AC25D6AD75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48zp-bdpe-xpt5"><intent_id>724270</intent_id><project_id>773854</project_id><text_data>Filed by John Hart</text_data><comment_date>2015-10-02T00:00:00</comment_date></row><row _id="row-wk8d_md6m~tft8" _uuid="00000000-0000-0000-A666-5B2839D756C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wk8d_md6m~tft8"><intent_id>958267</intent_id><project_id>872263</project_id><text_data>Employees &amp; equipment will be transported to the site using a single axle F350 crew cab pickup, dual axle 7000lb enclosed trailer &amp; single axle tow-behind hydroseeder. Trenches of a maximum depth of 18' will be dug using a 12.5hp trenching machine with 60% of digging done by hand using shovels, pick axes &amp; wheelbarrows. Subcontracted Plumber will perform the cross connection. Trenches will be backfilled by hand using shovels &amp; wheelbarrows.</text_data><comment_date>2019-02-01T00:00:00</comment_date></row><row _id="row-9gn9_8c46_aetc" _uuid="00000000-0000-0000-6D65-8AB645995874" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9gn9_8c46_aetc"><intent_id>896889</intent_id><project_id>846576</project_id><text_data>22469</text_data><comment_date>2018-04-05T00:00:00</comment_date></row><row _id="row-qsut~ahv6_94dj" _uuid="00000000-0000-0000-C2F8-5BEEA7813E24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qsut~ahv6_94dj"><intent_id>698648</intent_id><project_id>731491</project_id><text_data>Work performed by the Telecommunication Technicians is installing Cat5e cabling for data indoors.  The purpose of the data cabling being installed is for computer networking.  Physical location is 909 Broadway, Everett, WA</text_data><comment_date>2015-06-05T00:00:00</comment_date></row><row _id="row-rnzq_4qwk-vqb3" _uuid="00000000-0000-0000-DAC3-14D7F45E90C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rnzq_4qwk-vqb3"><intent_id>996691</intent_id><project_id>889108</project_id><text_data>Install cables that can be used for either telephone(Voice over Distance) or data(bitsand bytes) connection within the telecommunications system. All work to be performedindoors.</text_data><comment_date>2019-10-22T00:00:00</comment_date></row><row _id="row-nuiv-w5ay-gt8n" _uuid="00000000-0000-0000-3C4A-C3B8547AC6A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nuiv-w5ay-gt8n"><intent_id>583210</intent_id><project_id>713889</project_id><text_data>Evan Serrill #906107 65%.</text_data><comment_date>2013-07-24T00:00:00</comment_date></row><row _id="row-kdb7.m6ib~3gw6" _uuid="00000000-0000-0000-D8CE-D3FE6E9754F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kdb7.m6ib~3gw6"><intent_id>509246</intent_id><project_id>686581</project_id><text_data>general laborer checked and adjusted brakes on both cranes</text_data><comment_date>2012-05-07T00:00:00</comment_date></row><row _id="row-ckzd-9jdm.q522" _uuid="00000000-0000-0000-1146-839464EA7445" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ckzd-9jdm.q522"><intent_id>999446</intent_id><project_id>888293</project_id><text_data>Other Truck - Water TruckOther Truck - Lowboy Lowbed heavy duty trailer</text_data><comment_date>2019-08-14T00:00:00</comment_date></row><row _id="row-jt55.wmty_bmwa" _uuid="00000000-0000-0000-64CD-53871054533A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jt55.wmty_bmwa"><intent_id>952985</intent_id><project_id>869746</project_id><text_data>7019777</text_data><comment_date>2019-01-02T00:00:00</comment_date></row><row _id="row-8ycq.use7.hjzv" _uuid="00000000-0000-0000-668C-D7BBACF83D89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ycq.use7.hjzv"><intent_id>747636</intent_id><project_id>783962</project_id><text_data>Filed by Misael Ayala</text_data><comment_date>2016-02-19T00:00:00</comment_date></row><row _id="row-3chn_p4v5.fwit" _uuid="00000000-0000-0000-50E8-01BC8E64DF9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3chn_p4v5.fwit"><intent_id>748902</intent_id><project_id>777435</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2016-03-02T00:00:00</comment_date></row><row _id="row-erq3.gni6.8qpp" _uuid="00000000-0000-0000-9C9E-BC968E8607C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-erq3.gni6.8qpp"><intent_id>1217385</intent_id><project_id>1003286</project_id><text_data>General tools used by our technicians for electrical component equipment service Multi-Meter, insulated screwdriver, wire nuts, safety locks for lockout/tagout, insulated Allen wrenches. All technicians use company supplied vehicles to arrive at job site</text_data><comment_date>2022-03-12T00:00:00</comment_date></row><row _id="row-y8mh~qkkm_nvve" _uuid="00000000-0000-0000-8168-C4DD2EA8C281" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8mh~qkkm_nvve"><intent_id>1097788</intent_id><project_id>937178</project_id><text_data>These low voltage technicians worked on a telephone system, installing cables for telecom.</text_data><comment_date>2020-11-06T00:00:00</comment_date></row><row _id="row-a8xa_wuud_9f5i" _uuid="00000000-0000-0000-33DC-C6382DCCD29C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a8xa_wuud_9f5i"><intent_id>941188</intent_id><project_id>864127</project_id><text_data>Seattle Housing 4 Story resisdential</text_data><comment_date>2018-10-22T00:00:00</comment_date></row><row _id="row-ac9p.xnmq.i8hv" _uuid="00000000-0000-0000-ED2E-6DB43B0C9225" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ac9p.xnmq.i8hv"><intent_id>547781</intent_id><project_id>701146</project_id><text_data>emergency deck repair on a 3 story apartment complex. no basement or garage,permanent residence only, no rehab, no transtional , no communal dining, no treatment, no counseling. each unit has own bath and kitchen, managers office on site, no pubic use</text_data><comment_date>2012-12-10T00:00:00</comment_date></row><row _id="row-ctwt-wvvv_g59w" _uuid="00000000-0000-0000-D343-83C8906B8969" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ctwt-wvvv_g59w"><intent_id>1133604</intent_id><project_id>956936</project_id><text_data>Millwright is the correct trade for this work. The pump assembly, rebuilding and coupling alignment is Millwright work. The motor on the circulation pump was reassembled and the coupling was aligned. Assembly and alignment was all that was performed.</text_data><comment_date>2021-04-13T00:00:00</comment_date></row><row _id="row-uzm9-wjwj_hbvq" _uuid="00000000-0000-0000-E35D-55B4AA64B7AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzm9-wjwj_hbvq"><intent_id>1206719</intent_id><project_id>981508</project_id><text_data>TRUCK:  YEAR - 2005, MAKE - GMC, MODEL - C7500, WEIGHT - 26,000DELIVER PRODUCT TO JOBSITE.</text_data><comment_date>2022-01-25T00:00:00</comment_date></row><row _id="row-tvjm_geq4.tzfb" _uuid="00000000-0000-0000-5C30-19F0DD0F7E98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tvjm_geq4.tzfb"><intent_id>830607</intent_id><project_id>813758</project_id><text_data>Owner will be working with small crew</text_data><comment_date>2017-05-03T00:00:00</comment_date></row><row _id="row-7xkx~ui4h~qmqf" _uuid="00000000-0000-0000-F9D9-50F5438F264A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7xkx~ui4h~qmqf"><intent_id>609123</intent_id><project_id>649039</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS.  THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2013-12-18T00:00:00</comment_date></row><row _id="row-6rm4-sbuw~as6e" _uuid="00000000-0000-0000-E32E-5A7958A0111B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6rm4-sbuw~as6e"><intent_id>1126490</intent_id><project_id>951115</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2021-03-04T00:00:00</comment_date></row><row _id="row-vw9i_d4ye.ru5h" _uuid="00000000-0000-0000-516B-97152957F779" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vw9i_d4ye.ru5h"><intent_id>534064</intent_id><project_id>689039</project_id><text_data>Fringe Rate:Pension:       9.20H &amp; W:         6.77Appr:           .63Annuity:       4.00Imp:            .28Ind:            .01Total Fringe: 20.89</text_data><comment_date>2012-09-12T00:00:00</comment_date></row><row _id="row-hg96_an8h~gcc5" _uuid="00000000-0000-0000-6745-8A2A1617D337" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hg96_an8h~gcc5"><intent_id>1343563</intent_id><project_id>1069356</project_id><text_data>We are a Tribal Owned Company whose private insurance meets and/or exceeds LNI's Workers Comp.</text_data><comment_date>2023-07-11T00:00:00</comment_date></row><row _id="row-upj6~pz6u-g4wm" _uuid="00000000-0000-0000-07FA-7130F63B0749" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-upj6~pz6u-g4wm"><intent_id>606286</intent_id><project_id>721103</project_id><text_data>Our work on this project consists of ::  Hydroseeding 129,320 SF of lawn area, 8150 SF of stormwater facility, installing trees, shrubs and groundcover, installing drip irrigation system with 5 zones.</text_data><comment_date>2013-12-04T00:00:00</comment_date></row><row _id="row-arte-vwj7.bwc3" _uuid="00000000-0000-0000-6CE0-18C31F337020" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-arte-vwj7.bwc3"><intent_id>1135601</intent_id><project_id>958064</project_id><text_data>Description of whole project is as listed in 'Project Description' section of this form. Pease Construction's work will include select demolition, concrete work, installation of miscellaneous metals, window installation, wood trim, and Division 10 specialties.  General Laborers will perform select demolition (lifts and jackhammers will be used).</text_data><comment_date>2021-04-15T00:00:00</comment_date></row><row _id="row-7v6y_q5z8~n5ch" _uuid="00000000-0000-0000-BE89-0DE0E4B5EB45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7v6y_q5z8~n5ch"><intent_id>1223754</intent_id><project_id>1006939</project_id><text_data>Will use a gas powered trencher, hand saws to cut and fit irrigation pipe, and shovels to backfill trenches. Hand tools will be used to install and tighten sprinkler heads.</text_data><comment_date>2022-04-07T00:00:00</comment_date></row><row _id="row-932u.yrhq.56p3" _uuid="00000000-0000-0000-030C-94E5C2A924B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-932u.yrhq.56p3"><intent_id>883940</intent_id><project_id>827279</project_id><text_data>Job #114097-001 related to job #201908-002</text_data><comment_date>2018-01-18T00:00:00</comment_date></row><row _id="row-4nzy~5aww~ypjm" _uuid="00000000-0000-0000-D49D-CB4191E7ED47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4nzy~5aww~ypjm"><intent_id>1280994</intent_id><project_id>1039277</project_id><text_data>Called in by Franklin County Facilities</text_data><comment_date>2022-11-03T00:00:00</comment_date></row><row _id="row-5w8z.iysa_8wg3" _uuid="00000000-0000-0000-099A-6BDAE2E7A9CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5w8z.iysa_8wg3"><intent_id>579444</intent_id><project_id>710358</project_id><text_data>Installation of cabling for computer network in temporary portable classroom buildings.</text_data><comment_date>2013-07-07T00:00:00</comment_date></row><row _id="row-9sav.zast.n3ne" _uuid="00000000-0000-0000-0696-314B52940A8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9sav.zast.n3ne"><intent_id>1196448</intent_id><project_id>989931</project_id><text_data>sr50943870</text_data><comment_date>2021-12-01T00:00:00</comment_date></row><row _id="row-6cb7~35bn~vnhj" _uuid="00000000-0000-0000-1A55-7BD32B9443F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6cb7~35bn~vnhj"><intent_id>553614</intent_id><project_id>695299</project_id><text_data>General Laborer- hand shovel rock and asphalt (Laborer Union)Other trucks:Low-bed- mobilization of equipment (Teamsters Union)Fringe Breakdown- Note: we are a union company and these benefits are with the union contract (training- aopreticeship)$15.90= $7.55 medical, $0.70 training, $7.65 pension$16.23= $8.78 medical, $0.30 training, $7.15 pension</text_data><comment_date>2013-01-28T00:00:00</comment_date></row><row _id="row-2m4x_8qfk~e88c" _uuid="00000000-0000-0000-6720-AB924F5CCEFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2m4x_8qfk~e88c"><intent_id>1023849</intent_id><project_id>900536</project_id><text_data>Install network for a SCR monitor and raise existing network in NT578. All work is performed indoors.</text_data><comment_date>2019-11-26T00:00:00</comment_date></row><row _id="row-nnky-mx5f-qs2u" _uuid="00000000-0000-0000-CF11-FFC14729EC26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nnky-mx5f-qs2u"><intent_id>577138</intent_id><project_id>712847</project_id><text_data>Health &amp; Welfare - $7.23, Pension Fund - $9.48, Retirement Plan - $3.41, NEBF/Union - $2.10</text_data><comment_date>2013-06-24T00:00:00</comment_date></row><row _id="row-pqch-faxn~wh7s" _uuid="00000000-0000-0000-4C6E-033802918B36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqch-faxn~wh7s"><intent_id>717686</intent_id><project_id>765118</project_id><text_data>302002</text_data><comment_date>2015-08-31T00:00:00</comment_date></row><row _id="row-4kb2.s4jz~bxn9" _uuid="00000000-0000-0000-F958-3E0AD8BB05C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4kb2.s4jz~bxn9"><intent_id>1254299</intent_id><project_id>1020114</project_id><comment_date>2022-09-06T00:00:00</comment_date></row><row _id="row-m5nh.2bif_mbaa" _uuid="00000000-0000-0000-F23F-E363D48E9D30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m5nh.2bif_mbaa"><intent_id>862174</intent_id><project_id>832381</project_id><text_data>1. Dig up area where water is leaking in front of Bldg. B and repair the leak.2. apartment complex3. 34a.no4b.no4c.no4d.no4f.no4g.no4h.no4i.no4j.no4k.no4l.n/a5. yes6. yes7. yes8. no</text_data><comment_date>2017-09-12T00:00:00</comment_date></row><row _id="row-krpp-tj26-nnx6" _uuid="00000000-0000-0000-7F9D-298A70668DC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-krpp-tj26-nnx6"><intent_id>1343969</intent_id><project_id>984442</project_id><text_data>STONEWAY CONCRETE IS A MATERIAL SUPPLIER</text_data><comment_date>2023-07-12T00:00:00</comment_date></row><row _id="row-f7ge-59tq~dj68" _uuid="00000000-0000-0000-DE61-D7E287DCC356" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f7ge-59tq~dj68"><intent_id>985955</intent_id><project_id>884297</project_id><text_data>22663</text_data><comment_date>2019-06-19T00:00:00</comment_date></row><row _id="row-6nkx_8sms-bj5d" _uuid="00000000-0000-0000-83E0-368045271536" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6nkx_8sms-bj5d"><intent_id>808408</intent_id><project_id>763562</project_id><text_data>SunScapes, Inc.,will be installing new irrigation lines within the State&amp;#39;s specifications and adding landscaping for the beautification of the landscape. Trenches will be dug to install irrigation lines. Shovels, picks will be use for manual labor and a Mini X (17D)and a Bobcat (T-190)for other trenching. Fabric, mulch, sod and plants will be added to the landscape using manual labor.</text_data><comment_date>2016-12-22T00:00:00</comment_date></row><row _id="row-gang-ygtx.dm5x" _uuid="00000000-0000-0000-376B-66DDF6C73A05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gang-ygtx.dm5x"><intent_id>642156</intent_id><project_id>734024</project_id><text_data>WORKERS COMP CARRIER - SAIF CORP, POLICY #947202WE DO NOT HAVE ANY EMPLOYEES THAT ARE RESIDENTS OF WASHINGTONNOTE: ALL OF OUR $9.00 PER HOUR FRINGE GOES TO THE UNEMPLOYMENT BENEFIT PLAN</text_data><comment_date>2014-07-19T00:00:00</comment_date></row><row _id="row-yw5e~byxn-cr8w" _uuid="00000000-0000-0000-3679-9123B9FA0865" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yw5e~byxn-cr8w"><intent_id>1083764</intent_id><project_id>926111</project_id><text_data>OREGON WORKMANS COMP INSURANCE WILL COVER EMPLOYEES WORKING IN WASHINGTON</text_data><comment_date>2020-08-27T00:00:00</comment_date></row><row _id="row-cjnx-ftu7~aatb" _uuid="00000000-0000-0000-4A4E-9819ACCAB028" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjnx-ftu7~aatb"><intent_id>1146105</intent_id><project_id>960155</project_id><text_data>Workers will be using lawnmowers, edgers, weed eaters to maintain lawns at various locations  They will be doing manual weeding, raking or bark dust and using hand tools to clean up lawn waste.</text_data><comment_date>2021-05-31T00:00:00</comment_date></row><row _id="row-9c9m.mfs3.9yeb" _uuid="00000000-0000-0000-0D61-FE3D712BB5E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9c9m.mfs3.9yeb"><intent_id>1465860</intent_id><project_id>1135028</project_id><text_data>Scarsella #1087</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-ur8c~jbbi~mwkm" _uuid="00000000-0000-0000-81CF-F852F1E39E0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ur8c~jbbi~mwkm"><intent_id>733633</intent_id><project_id>771161</project_id><text_data>Filed by Lucas OberhanslyProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24CFR 965 101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-rtij-er48.md4m" _uuid="00000000-0000-0000-D7FD-6A6BE2B2CE59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rtij-er48.md4m"><intent_id>1316954</intent_id><project_id>1061498</project_id><text_data>#1Replace water heaters is single family home#2single family #3  1 or 2 story #4. A no. B no. C yes. D no. e no. F no. G no. H no. I no j no k no L none#5 yes#6 yes #7 no#8 no</text_data><comment_date>2023-04-04T00:00:00</comment_date></row><row _id="row-3xig.r8gg_8ku9" _uuid="00000000-0000-0000-716D-90239CD8D953" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3xig.r8gg_8ku9"><intent_id>482857</intent_id><project_id>635102</project_id><text_data>SELECTED INCORRECT HIRING CONTRACTORCORRECT HIRING CONTRACTOR:  JACK HORNOR ELECTRIC - UBI: 600 110 851</text_data><comment_date>2011-10-27T00:00:00</comment_date></row><row _id="row-m9yg~6rgk-irn6" _uuid="00000000-0000-0000-1283-002F8D64459F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m9yg~6rgk-irn6"><intent_id>1142438</intent_id><project_id>952101</project_id><text_data>Trucking; hauling of materials</text_data><comment_date>2021-05-06T00:00:00</comment_date></row><row _id="row-vr4e-pf9h.fdta" _uuid="00000000-0000-0000-FDD5-41E19B5FE7BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vr4e-pf9h.fdta"><intent_id>723356</intent_id><project_id>772437</project_id><text_data>1 sewer clear 2 single 3 1 4a no b no c yes d no e no f no g no h no i no j no k no 5 yes 6 yes 7 no 8 no</text_data><comment_date>2015-09-28T00:00:00</comment_date></row><row _id="row-utkm~sw8g_92bn" _uuid="00000000-0000-0000-7206-07C859EEA5A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utkm~sw8g_92bn"><intent_id>606938</intent_id><project_id>724925</project_id><text_data>We are only working in King County.</text_data><comment_date>2013-12-09T00:00:00</comment_date></row><row _id="row-b7g4-5xgi_8yat" _uuid="00000000-0000-0000-B55B-01ED6B67E8DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b7g4-5xgi_8yat"><intent_id>450421</intent_id><project_id>663883</project_id><text_data>Sorry, they are corrected now.</text_data><comment_date>2011-04-21T00:00:00</comment_date></row><row _id="row-593j.3j6a-hici" _uuid="00000000-0000-0000-406F-FB64C89962C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-593j.3j6a-hici"><intent_id>1245552</intent_id><project_id>1015915</project_id><text_data>Job# 04206S</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-6y7e~bbhc.5acn" _uuid="00000000-0000-0000-553B-F5CDBC2A286C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6y7e~bbhc.5acn"><intent_id>738710</intent_id><project_id>781278</project_id><text_data>)We were contracted to repair the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2015-12-21T00:00:00</comment_date></row><row _id="row-mhrd.vf9k~yppp" _uuid="00000000-0000-0000-71EF-1CFE7E533A12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mhrd.vf9k~yppp"><intent_id>560262</intent_id><project_id>435529</project_id><text_data>Amending Intent 306879</text_data><comment_date>2013-03-15T00:00:00</comment_date></row><row _id="row-68w8~7qxj_29xi" _uuid="00000000-0000-0000-E167-9D86D51A52F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-68w8~7qxj_29xi"><intent_id>518336</intent_id><project_id>685617</project_id><text_data>Filed by: Jess J. Poland</text_data><comment_date>2012-06-22T00:00:00</comment_date></row><row _id="row-6gd7.ync2~jc3u" _uuid="00000000-0000-0000-0FC5-C4878A484724" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6gd7.ync2~jc3u"><intent_id>620190</intent_id><project_id>730893</project_id><text_data>1)Replacing a hydronic air handler with a new gas furnace 2)Single family Dwelling 3)One level 4a)NO b)NO c)Yes d)No e)No F)NO g)No h)no I)No j)no k)no 5)Yes 6)Yes 7)No 8) No</text_data><comment_date>2014-03-21T00:00:00</comment_date></row><row _id="row-gudu~w7u6~g7nb" _uuid="00000000-0000-0000-5A99-ACB7AF2C07B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gudu~w7u6~g7nb"><intent_id>535040</intent_id><project_id>695421</project_id><text_data>Super 8000 Dean Dr 98240</text_data><comment_date>2012-09-18T00:00:00</comment_date></row><row _id="row-zu7z.mmw6_f8h5" _uuid="00000000-0000-0000-5533-8C6DF2AEA914" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zu7z.mmw6_f8h5"><intent_id>1017065</intent_id><project_id>896859</project_id><text_data>WO #22164: City of Bellevue Newport Creek Fish Passage-Invasive Control</text_data><comment_date>2019-10-22T00:00:00</comment_date></row><row _id="row-hmmx-z6n6~23pe" _uuid="00000000-0000-0000-8127-4406A5FD5C2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hmmx-z6n6~23pe"><intent_id>490228</intent_id><project_id>678623</project_id><text_data>This Bundle includes:2980 Beaver Pl, Sedro Woolley2212 J Street, Bellingham2604 Irwin Dr, Bellingham32 Stable Ln, Bellingham425 Chuckanut Dr, Bellingham92 Honeycomb Ln, Bellingham 36 Rocky Ridge Dr, Bellingham4238 Mt Baker Hwy, Everson 5331 Belfern, Bellingham4983 Ferndale Rd, Ferndale 28 Creekside Ln, Bellingham4405 College St, Bellingham4320 Sweet Rd #A, Blaine4320 Sweet Rd #B, Blaine2204 Huron St, Bellingham</text_data><comment_date>2011-11-21T00:00:00</comment_date></row><row _id="row-5isn-gabb~t6db" _uuid="00000000-0000-0000-99D3-5AF91E9FB299" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5isn-gabb~t6db"><intent_id>994645</intent_id><project_id>880829</project_id><text_data>1. Gutters and downspouts on residential apartments. 2. apartment 3. 1 and 2 story units4. housinga. nob. noc. yesd. no e. nof. nog. no h. no I. noj. nok. yesl. no5. yes6. yes7. yes8. no</text_data><comment_date>2019-07-25T00:00:00</comment_date></row><row _id="row-gink.qewc-tqzk" _uuid="00000000-0000-0000-564D-AA7562EB4622" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gink.qewc-tqzk"><intent_id>1220254</intent_id><project_id>1005163</project_id><text_data>LE 2103048</text_data><comment_date>2022-03-23T00:00:00</comment_date></row><row _id="row-rr8q.4epj~rmzd" _uuid="00000000-0000-0000-544E-F8E3AC39A606" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rr8q.4epj~rmzd"><intent_id>660826</intent_id><project_id>741779</project_id><text_data>Apprentice: Ann 4.75, Pen 9.95, H&amp;W 6.77, Impact .29, App .65, Ind .02, Vac, 1.5, Dues .78 = 24.71Journeyman: Ann 4.75, Pen 9.95, H&amp;W 6.77, Impact .29, App .65, Ind .02, Vac, 1.5, Dues .88 = 24.81</text_data><comment_date>2014-10-16T00:00:00</comment_date></row><row _id="row-4z6v.cwzw-9qhz" _uuid="00000000-0000-0000-2A9E-B45D6A34BC99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4z6v.cwzw-9qhz"><intent_id>1342931</intent_id><project_id>1076432</project_id><text_data>1.Weatherization 2. single family 3. 1 4. Aa0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2023-07-10T00:00:00</comment_date></row><row _id="row-k5tw_tzgk_qg3y" _uuid="00000000-0000-0000-9EE3-E547C90444E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k5tw_tzgk_qg3y"><intent_id>1272030</intent_id><project_id>1027082</project_id><text_data>16' box truck used to removed equipment from premesis</text_data><comment_date>2022-12-09T00:00:00</comment_date></row><row _id="row-vhqn~8w58~zuxj" _uuid="00000000-0000-0000-7160-B994F2E0A224" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vhqn~8w58~zuxj"><intent_id>540442</intent_id><project_id>687620</project_id><text_data>1112030</text_data><comment_date>2012-10-17T00:00:00</comment_date></row><row _id="row-g58p-b85w-4wrs" _uuid="00000000-0000-0000-CF56-B251961E2767" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g58p-b85w-4wrs"><intent_id>1088917</intent_id><project_id>932973</project_id><text_data>Hourly Fringe Benefit of $2.03:  $2.03/hr Combined Medical/Dental Providence Plan</text_data><comment_date>2020-09-28T00:00:00</comment_date></row><row _id="row-5vpx.gicj~nksd" _uuid="00000000-0000-0000-6A28-633B0570DD52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vpx.gicj~nksd"><intent_id>626994</intent_id><project_id>727771</project_id><text_data>This will be telephone and data CAT5e cabling and CATV coax cabling installation performed indoors. The work will be performed in 2 new 8-story buildings.</text_data><comment_date>2014-05-12T00:00:00</comment_date></row><row _id="row-h6nu.g876~q49q" _uuid="00000000-0000-0000-934C-7CBE791D9210" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h6nu.g876~q49q"><intent_id>902772</intent_id><project_id>845939</project_id><text_data>We do not know the entire scope of this project as we are only performing the erosion control portion. Our laborers use hand tools like picks, shovels, and post pounders to install temporary erosion and sediment control products.</text_data><comment_date>2018-05-04T00:00:00</comment_date></row><row _id="row-a97p-wihi_7e8b" _uuid="00000000-0000-0000-86BB-4D65248C305B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a97p-wihi_7e8b"><intent_id>819953</intent_id><project_id>802714</project_id><text_data>a) the entire scope of the project is restoration of six areas in Auburn.b) our portion of the project is to install hydroseed, per specifications on designated and prepared areas - using a hydroseed installation truck. Hydroseed is a one-step process.</text_data><comment_date>2017-03-09T00:00:00</comment_date></row><row _id="row-658r_kasc~f99q" _uuid="00000000-0000-0000-A1AC-5484D2CAF96D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-658r_kasc~f99q"><intent_id>1128591</intent_id><project_id>932211</project_id><text_data>Owner/Operator</text_data><comment_date>2021-03-14T00:00:00</comment_date></row><row _id="row-3gfv_i2uz_h9z9" _uuid="00000000-0000-0000-B89F-940FCED5F80A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gfv_i2uz_h9z9"><intent_id>1331005</intent_id><project_id>1068332</project_id><text_data>Continuant will provide telecom techs and installers to complete this project.</text_data><comment_date>2023-05-25T00:00:00</comment_date></row><row _id="row-hij2-iuxc.f9ca" _uuid="00000000-0000-0000-F478-92F13B38C1C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hij2-iuxc.f9ca"><intent_id>646193</intent_id><project_id>741181</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Installation of new water heater, two faucets and fill valve.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have?2 #4 - What is the building used for? �-Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? N(b) Any retail use in the structure?N(c) Permanent residence only?Y(d) Rehabilitation house? N(e) Transitional housing?N(f) Communal dining facility? N(g) Treatment services?N(h) Dormitories?N(i) Counseling?N(j) Is each room and/or bed in the structure rented separately?N(k) Other? #5 - Does each dwelling unit have its own self-contained kitchen?n#6 - Does each dwelling unit have its own bathroom?n#7 - Is there a community facility or manager�s office on site?n#8 - Is any part of the structure used by members of the public?N</text_data><comment_date>2014-08-06T00:00:00</comment_date></row><row _id="row-k7rb~i29q_ey4b" _uuid="00000000-0000-0000-6E9E-6F17559A58D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7rb~i29q_ey4b"><intent_id>813307</intent_id><project_id>812236</project_id><text_data>Job #110198-001</text_data><comment_date>2017-01-30T00:00:00</comment_date></row><row _id="row-yb9j.5pqt~yfsj" _uuid="00000000-0000-0000-C888-8DF372304858" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yb9j.5pqt~yfsj"><intent_id>948529</intent_id><project_id>865804</project_id><text_data>Filed by Robin RomansNWC Job # 4145</text_data><comment_date>2018-11-30T00:00:00</comment_date></row><row _id="row-wnag-iy3k-f2zv" _uuid="00000000-0000-0000-74D3-C8A6B50E8E2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wnag-iy3k-f2zv"><intent_id>843159</intent_id><project_id>803962</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.</text_data><comment_date>2017-06-26T00:00:00</comment_date></row><row _id="row-aayu~aj67_kp6p" _uuid="00000000-0000-0000-BBD7-00FB854C4454" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aayu~aj67_kp6p"><intent_id>1283300</intent_id><project_id>1040717</project_id><text_data>Inside FM Electrician - Wage $59.24; District 9 $5.29; Edison Pension $9.35; NEBF $1.78; Health &amp; Welfare $10.00; Flex $1.30; Apprenticeship $.80; BLMCC $.20 (total fringe $28.72) Total 87.96</text_data><comment_date>2022-11-14T00:00:00</comment_date></row><row _id="row-issr~da2r~jhib" _uuid="00000000-0000-0000-F4C8-19ABD1FBB3F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-issr~da2r~jhib"><intent_id>1227313</intent_id><project_id>977136</project_id><text_data>The General Contractor is responsible for all of the construction on this project. Our portion of the work was to resod planting strips.</text_data><comment_date>2022-04-21T00:00:00</comment_date></row><row _id="row-truc.s3dk~hfdy" _uuid="00000000-0000-0000-B6C2-C86F6A97948D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-truc.s3dk~hfdy"><intent_id>803994</intent_id><project_id>805461</project_id><text_data>Equipment Used: Skid Steer &amp; TrailerTools Used: Shovels</text_data><comment_date>2016-12-06T00:00:00</comment_date></row><row _id="row-vrx3~4mrc_5xhd" _uuid="00000000-0000-0000-A11F-9A1F0F62026B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vrx3~4mrc_5xhd"><intent_id>920443</intent_id><project_id>854734</project_id><text_data>TRUCKSlowboy delivers asphalt rotomill to jobsite</text_data><comment_date>2018-07-24T00:00:00</comment_date></row><row _id="row-r9mu.wsv4-gb5d" _uuid="00000000-0000-0000-7DAA-98FB1243D46F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9mu.wsv4-gb5d"><intent_id>1465720</intent_id><project_id>1144627</project_id><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-thzd-ivud~dtg9" _uuid="00000000-0000-0000-87E5-667AF8BDC2FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thzd-ivud~dtg9"><intent_id>1467238</intent_id><project_id>1122605</project_id><text_data>1) Septic Panel replacement2) Single Family Dwelling3) 1 Level4) a) no b) no c) yes d) no e) no f) no g) no h) no i) no j) no k) no5) N/A6) N/A7) No8) No</text_data><comment_date>2024-09-17T00:00:00</comment_date></row><row _id="row-ubx7_wtf5~r2d7" _uuid="00000000-0000-0000-6252-E014E28136B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ubx7_wtf5~r2d7"><intent_id>598225</intent_id><project_id>718650</project_id><text_data>State of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form-Evergreen Medical Center Silver Cafeteria Kitchen RemodelPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?Remodel existing kitchen and cafeteria to improve Evergreen Medical Center facility. 2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.) Does this project entail the remodeling or new construction of a facility?Yes, but not performed by Siemens Employees.4.) If your firm is working upon a type of building system, what type of system is involved? HVAC control system.5.) What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.  6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.) Are you going to be hiring any subcontractors for this project?Yes.</text_data><comment_date>2013-10-08T00:00:00</comment_date></row><row _id="row-5inw_y96s.7x8p" _uuid="00000000-0000-0000-642F-EDC0CAA5A528" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5inw_y96s.7x8p"><intent_id>809856</intent_id><project_id>810604</project_id><text_data>5111 N Post Spokane Wa 99205 Po B 104  Amt 500.004918 N Freya Spokane Wa 99217 P.o.A103 Amt 500.00 Both these are emergency Furnace repair</text_data><comment_date>2017-01-05T00:00:00</comment_date></row><row _id="row-iykq.kuvx-hu4s" _uuid="00000000-0000-0000-18EE-19250B573AFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iykq.kuvx-hu4s"><intent_id>976728</intent_id><project_id>879924</project_id><text_data>PPC #19160</text_data><comment_date>2019-05-08T00:00:00</comment_date></row><row _id="row-3hqa-5pmb-3p6j" _uuid="00000000-0000-0000-2F3C-8F0BF1715CDB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3hqa-5pmb-3p6j"><intent_id>973355</intent_id><project_id>879219</project_id><text_data>Install a Daikin single zone ductless heatpump</text_data><comment_date>2019-04-23T00:00:00</comment_date></row><row _id="row-64ci_xyr8-nmzy" _uuid="00000000-0000-0000-8345-0263C3A179AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-64ci_xyr8-nmzy"><intent_id>657131</intent_id><project_id>733002</project_id><text_data>Form filed by: Bernard H Meile</text_data><comment_date>2014-09-26T00:00:00</comment_date></row><row _id="row-j86s-6ddy.ydpf" _uuid="00000000-0000-0000-FF24-515D7AD6ADF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j86s-6ddy.ydpf"><intent_id>844601</intent_id><project_id>825987</project_id><text_data>Install New cables that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-06-30T00:00:00</comment_date></row><row _id="row-cm4p-6zh6~79uu" _uuid="00000000-0000-0000-B975-17994724A1E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cm4p-6zh6~79uu"><intent_id>718581</intent_id><project_id>771482</project_id><text_data>filed by Dominic Pollaro</text_data><comment_date>2015-09-02T00:00:00</comment_date></row><row _id="row-fw9s.6cmf_4er7" _uuid="00000000-0000-0000-42B7-5720B30028D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fw9s.6cmf_4er7"><intent_id>1008466</intent_id><project_id>893783</project_id><text_data>Elect tech(06)Inside workAV Systemprovide and install 165 customer provided short throw projector.</text_data><comment_date>2019-09-19T00:00:00</comment_date></row><row _id="row-9pws_9n62~umn4" _uuid="00000000-0000-0000-E1E7-7ECD43F6B568" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9pws_9n62~umn4"><intent_id>896362</intent_id><project_id>847363</project_id><text_data>Specification No. PW17-0384FGeneral Laborer: Hand shovel rock and asphalt (Laborers Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2018-04-03T00:00:00</comment_date></row><row _id="row-kpdq-nbsw_ksqs" _uuid="00000000-0000-0000-70A9-0634BA223F24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kpdq-nbsw_ksqs"><intent_id>498289</intent_id><project_id>665371</project_id><text_data>These structures are used as permanent single family residences. Each unit has its own kitchen and bathroom. The purpose of this project is to alter, repair, improve or maintain the single family residence that is used solely as a permanent single family residence. Absolutely no work will be or has been performed on a community building or other public area</text_data><comment_date>2012-01-27T00:00:00</comment_date></row><row _id="row-kb76-f4be-vya9" _uuid="00000000-0000-0000-15CE-2C4C8A8D803E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kb76-f4be-vya9"><intent_id>531005</intent_id><project_id>694715</project_id><text_data>We are an Oregon company. Our WC policy is with SAIF, policy #441099.</text_data><comment_date>2012-08-27T00:00:00</comment_date></row><row _id="row-tbap.c2ji-zgdh" _uuid="00000000-0000-0000-496A-5C3F723208C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tbap.c2ji-zgdh"><intent_id>1266492</intent_id><project_id>1011339</project_id><text_data>MTC's employee utilized a Ground Penetrating Radar 'GPR' to obtain images of the subsurface and a small tablet to view the images.</text_data><comment_date>2022-10-25T00:00:00</comment_date></row><row _id="row-bp4r-ixuq-dhj2" _uuid="00000000-0000-0000-F5B8-E735BA1C6E47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bp4r-ixuq-dhj2"><intent_id>1140336</intent_id><project_id>960035</project_id><text_data>#1-We were contracted to REPLACE WATER HEATER. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2021-04-28T00:00:00</comment_date></row><row _id="row-enrf.37f6_qzz3" _uuid="00000000-0000-0000-D6EE-BB52ED6F2683" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-enrf.37f6_qzz3"><intent_id>1206090</intent_id><project_id>996223</project_id><text_data>Haz Waste worker to clear area of all debrisMotor Pat Grader to vacuum all contaminated soils</text_data><comment_date>2022-01-21T00:00:00</comment_date></row><row _id="row-xa3j~kq7i~kng9" _uuid="00000000-0000-0000-4A36-50208A9DE1D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xa3j~kq7i~kng9"><intent_id>1010528</intent_id><project_id>894598</project_id><text_data>Telecommunication wi-fi cablingall work will be done indoors</text_data><comment_date>2019-09-27T00:00:00</comment_date></row><row _id="row-c9ai_5r27~8c2q" _uuid="00000000-0000-0000-5510-9A8E649A06EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9ai_5r27~8c2q"><intent_id>1204530</intent_id><project_id>995139</project_id><text_data>This work crew was lead by the Owner/Operator of Cadillac Lawn care, who directed the work and was responsible for concrete finishing. Employees working in the General Laborer category assisted the Owner/Operator by clearing the ground, setting concrete forms (under supervision), spreading concrete (under supervision), and cleaning up the work-site.</text_data><comment_date>2022-02-09T00:00:00</comment_date></row><row _id="row-ibpr-f69d~hn3r" _uuid="00000000-0000-0000-E36E-2A80A06F4816" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ibpr-f69d~hn3r"><intent_id>1026439</intent_id><project_id>910744</project_id><text_data>193765- Telecommunications Technicians will install cabling for computer and phone to replace existing cables. Cables will run indoors.</text_data><comment_date>2019-12-11T00:00:00</comment_date></row><row _id="row-954k_4d3t_chqz" _uuid="00000000-0000-0000-BA3D-4018A3336E27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-954k_4d3t_chqz"><intent_id>892691</intent_id><project_id>845760</project_id><text_data>Clean spilled oil from cracked pan and clean impacted catch basinHaz Waste workers to clear area of all debris using shovels/rakes/broomsMotor Pat Grader to vacuum area of all contaminated liquids</text_data><comment_date>2018-03-14T00:00:00</comment_date></row><row _id="row-2i54_bppy_qv6x" _uuid="00000000-0000-0000-ED52-7F801C297078" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2i54_bppy_qv6x"><intent_id>468772</intent_id><project_id>671088</project_id><text_data>021017</text_data><comment_date>2011-07-28T00:00:00</comment_date></row><row _id="row-ggwv~5ngi~rjpd" _uuid="00000000-0000-0000-A6A0-5278EDBF4BA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ggwv~5ngi~rjpd"><intent_id>978510</intent_id><project_id>859547</project_id><text_data>PN # 66855SEA</text_data><comment_date>2019-05-16T00:00:00</comment_date></row><row _id="row-cjhi-vqs9~rc44" _uuid="00000000-0000-0000-22AC-3B561C6BE0BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjhi-vqs9~rc44"><intent_id>543114</intent_id><project_id>699133</project_id><text_data>4714 Willis StreetBellingham, WA 98225</text_data><comment_date>2012-11-07T00:00:00</comment_date></row><row _id="row-ybyi_cdie-z82t" _uuid="00000000-0000-0000-C343-ED70DFCB82D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ybyi_cdie-z82t"><intent_id>808566</intent_id><project_id>807915</project_id><text_data>entire scope of anderson poolworks project includes demo of plaster and tile surfacethis includes equipment such as demo hammers and chippers, fans, blowers, hosesshovels, wheelbarrows, brooms for clean uptile sub moves in to float entire surface with ardex thinsettile sub then places waterline tile and trim stretcher pieces on stairs/benchtile sub then places 1x1 non glaze biscuit colored tile on entire interior surfacetile sub grouts tilethen clean upadditional equipment will include work trucks and a dump trailer for debris removed</text_data><comment_date>2016-12-29T00:00:00</comment_date></row><row _id="row-hpf6_s5a4~skmq" _uuid="00000000-0000-0000-EB2C-D9C8F1BFBA5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hpf6_s5a4~skmq"><intent_id>488811</intent_id><project_id>670773</project_id><text_data>We will be planting trees and shrubs as well as staking trees. Spread bark 2inches deep, and mix compost with existing soil.</text_data><comment_date>2011-11-14T00:00:00</comment_date></row><row _id="row-89jf-gbu9~5mwg" _uuid="00000000-0000-0000-24B3-D583BB86FFD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89jf-gbu9~5mwg"><intent_id>960747</intent_id><project_id>873467</project_id><text_data>Lisa Bergeron is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing a new heat pump. This job meets the residential job requirements.</text_data><comment_date>2019-02-18T00:00:00</comment_date></row><row _id="row-kjgc-tagj.3b5e" _uuid="00000000-0000-0000-0C9C-939131711797" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kjgc-tagj.3b5e"><intent_id>639794</intent_id><project_id>584296</project_id><text_data>Filed by Terry Calloway.</text_data><comment_date>2014-07-09T00:00:00</comment_date></row><row _id="row-phz2_qcbg_7xbe" _uuid="00000000-0000-0000-06D0-85D8B251F1A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-phz2_qcbg_7xbe"><intent_id>622580</intent_id><project_id>723801</project_id><text_data>Union Benefits:Health $6.77Pension $9.95Annuity $4.00Apprenticeship $.63IMPACT $.28Industry $.01</text_data><comment_date>2014-03-31T00:00:00</comment_date></row><row _id="row-8s7w-4sqn~p7k6" _uuid="00000000-0000-0000-AA88-BFCD69A310FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8s7w-4sqn~p7k6"><intent_id>1092341</intent_id><project_id>934152</project_id><text_data>WRS Job # E20-526PW6Truck Driver / Other Trucks will be used to mob and demob equipment</text_data><comment_date>2020-09-30T00:00:00</comment_date></row><row _id="row-y8e4.dbyk.vyah" _uuid="00000000-0000-0000-19B7-7CD6E6B48B8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8e4.dbyk.vyah"><intent_id>888312</intent_id><project_id>843723</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2018-03-08T00:00:00</comment_date></row><row _id="row-wv3j~c6ja~z7vb" _uuid="00000000-0000-0000-DDFE-38EB6319F90E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wv3j~c6ja~z7vb"><intent_id>1056711</intent_id><project_id>902347</project_id><text_data>Job #33028-1</text_data><comment_date>2020-05-08T00:00:00</comment_date></row><row _id="row-8mut.4wfy-3njr" _uuid="00000000-0000-0000-63B0-7EE96DB12FA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8mut.4wfy-3njr"><intent_id>559715</intent_id><project_id>706656</project_id><text_data>MMFS Job#7336183</text_data><comment_date>2013-03-12T00:00:00</comment_date></row><row _id="row-fdjy~u7cz_qjuy" _uuid="00000000-0000-0000-7CBC-1B368A96CB01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fdjy~u7cz_qjuy"><intent_id>1274284</intent_id><project_id>1035147</project_id><text_data>Repair non working circuitsyes2livingnonoyesnononononononononoyesnono</text_data><comment_date>2022-10-12T00:00:00</comment_date></row><row _id="row-6jt4-jxhr.8zvf" _uuid="00000000-0000-0000-9875-A6D8900EA3A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6jt4-jxhr.8zvf"><intent_id>1005103</intent_id><project_id>890038</project_id><text_data>In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions in the notes section at the bottom of this screen: #1 - Describe the work that your firm was contracted to perform. Clean and tune for electric furnace, install new thermostat and replace filter #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? yes #3 - Including any basement or garage, how many stories or levels does the structure have? 1 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no (b) Any retail use in the structure? no(c) Permanent residence only? no(d) Rehabilitation house? no(e) Transitional housing? no(f) Communal dining facility? v(g) Treatment services?no (h) Assisted living services?no (I) Dormitories?no (j) Counseling?no (k) Is each room and/or bed in the structure rented separately? no(l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? yes#6 - Does each dwelling unit have its own bathroom? yes#7 - Is there a community facility or manager�s office on site? no#8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2019-09-05T00:00:00</comment_date></row><row _id="row-u7n4.nvi7.dppe" _uuid="00000000-0000-0000-2C63-04004DE8AEFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u7n4.nvi7.dppe"><intent_id>644941</intent_id><project_id>734364</project_id><text_data>In answer to your inquiries:A.	The project consists of the modernization of Elk Plain School for Bethel School District No. 403. Though we are not in a position to know the scope of other trade�s activities, one could reasonably speculate there is a substantial amount of work being performed by other trades. To answer this inquiry beyond speculation, the General Contractor is: Jones &amp; RobertsPO Box 1488Olympia WA 98507(360) 456-4311B.	Our work on this project consists of activity within the scope of WAC 296-127-01346. Scope of Work: The Subcontractor (Total Grounds Management) shall furnish and perform all labor, materials, tools, supplies, equipment, services, facilities, and supervision necessary for the complete and proper performance of the following portions of work:Division: 32 Section: 32 8000, 32 9000Description: Irrigation, Planting &amp; Seeding, Soil installed�	Placement,  preparation, of imported topsoil to depths specified (4� &amp; 6�) at planting, seeded lawns. no net sod lawns, rough lawns, and restoration areas.�	Installation of trees, shrubs, and groundcover at grade, including all staking, tying, fertilizing and maintenance and warranty�	Installation of 3&amp;quot; depth mulch in  all newly planted beds, mulch only beds, and rain gardens�	Installation  of fully  automatic  irrigation  system  per landscape  and irrigation  drawings  as  well  as  sleeving and  temp  irrigation  for  all  non  irrigated  areas  for establishment as per spec. (Trenching to max of 18�) �	This proposal includes all Hydroseeding for formal lawn areas, rough seed areas. and restoration areas�	This proposal includes the installation of no net sod per addenda #3.Tools: Wheelbarrows, rakes, shovels, trencher, bobcat</text_data><comment_date>2014-10-02T00:00:00</comment_date></row><row _id="row-eanv.yiji.m38v" _uuid="00000000-0000-0000-1DC9-131CB99829AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eanv.yiji.m38v"><intent_id>713575</intent_id><project_id>769640</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2015-08-27T00:00:00</comment_date></row><row _id="row-2k6g-6x4m_pwwk" _uuid="00000000-0000-0000-0A8F-413C01D23009" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2k6g-6x4m_pwwk"><intent_id>598089</intent_id><project_id>721519</project_id><text_data>Filed by Jennifer Perry</text_data><comment_date>2013-10-07T00:00:00</comment_date></row><row _id="row-c5gy~t8tw_nvps" _uuid="00000000-0000-0000-FBB4-1DBACC1C94DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c5gy~t8tw_nvps"><intent_id>915126</intent_id><project_id>854824</project_id><text_data>Other trucks = pickup trucks &amp; lowbed</text_data><comment_date>2018-06-29T00:00:00</comment_date></row><row _id="row-ei43-2hjb~pm5h" _uuid="00000000-0000-0000-35A1-2001B81038CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ei43-2hjb~pm5h"><intent_id>1221661</intent_id><project_id>981734</project_id><text_data>Federally Funded - This is a Housing Act of 1937 project per 24 CFR 965.101 and is exempt from the state prevailing wage rates but not exempt from the application of other prevailing wage requirements under the Washington State laws, rules and policies.</text_data><comment_date>2022-03-30T00:00:00</comment_date></row><row _id="row-scn5.nfdy_4rih" _uuid="00000000-0000-0000-5250-1E5BE190CDAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-scn5.nfdy_4rih"><intent_id>616170</intent_id><project_id>721138</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2014-02-27T00:00:00</comment_date></row><row _id="row-9d2k~tmey_g8r4" _uuid="00000000-0000-0000-8423-89B3FA3D2733" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9d2k~tmey_g8r4"><intent_id>883336</intent_id><project_id>841427</project_id><text_data>Electric Furance Isnt Working</text_data><comment_date>2018-01-15T00:00:00</comment_date></row><row _id="row-wpts.daze~9sns" _uuid="00000000-0000-0000-3FB9-CDE4EC5D36C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wpts.daze~9sns"><intent_id>997236</intent_id><project_id>795963</project_id><text_data>Material supply only</text_data><comment_date>2019-08-06T00:00:00</comment_date></row><row _id="row-7er5_b2ea.u6vz" _uuid="00000000-0000-0000-5272-0EEBC42F74F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7er5_b2ea.u6vz"><intent_id>685242</intent_id><project_id>755825</project_id><text_data>Form filed by:  Heather Rader</text_data><comment_date>2015-03-24T00:00:00</comment_date></row><row _id="row-dpn4_9pec~fwtb" _uuid="00000000-0000-0000-3044-076437A653EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpn4_9pec~fwtb"><intent_id>1011494</intent_id><project_id>873197</project_id><text_data>GRANIE</text_data><comment_date>2019-10-02T00:00:00</comment_date></row><row _id="row-un2b~x3rg~76zp" _uuid="00000000-0000-0000-DCE2-2FEBF5D7B986" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-un2b~x3rg~76zp"><intent_id>490737</intent_id><project_id>678860</project_id><text_data>The scope of work for this project is to perform pole transfers for OSP fiber for voice.</text_data><comment_date>2011-11-23T00:00:00</comment_date></row><row _id="row-rh8f~j929~36nz" _uuid="00000000-0000-0000-F552-27F11BC62175" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rh8f~j929~36nz"><intent_id>1364197</intent_id><project_id>1018647</project_id><text_data>2309-082P</text_data><comment_date>2023-09-15T00:00:00</comment_date></row><row _id="row-hk8p~iaft~2njj" _uuid="00000000-0000-0000-8B1A-DD241A06B0FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hk8p~iaft~2njj"><intent_id>543498</intent_id><project_id>680094</project_id><text_data>Transporting product from Walla Walla Precast facility to the Grant Co. PUD will be provided solely by the Owner.  Owner may also work as a General Laborer and Backhoe Operator depending on need.</text_data><comment_date>2012-11-07T00:00:00</comment_date></row><row _id="row-89em-3mqu.r6q8" _uuid="00000000-0000-0000-9440-875EFF9CC43C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89em-3mqu.r6q8"><intent_id>676682</intent_id><project_id>739344</project_id><text_data>Interior and exterior renovation of existing 4 level apartment building. No commercial, retail or public use in building. No rehab, transitional, communal dining, treatment, dorms or counseling in building. Each unit rented separately for permanent residence with own kitchen &amp; bath. Manager&amp;#39;s office on site.</text_data><comment_date>2015-01-27T00:00:00</comment_date></row><row _id="row-th6d~hwku-9esc" _uuid="00000000-0000-0000-81AD-7BEF602DF53E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-th6d~hwku-9esc"><intent_id>635477</intent_id><project_id>731319</project_id><text_data>A)  The construction of a 250 gpm duplex wastewater pump station w/ submersible non clog pump, 8' diameter x approx. 22' deep wet well.  17 x 28 CMU building to house the valves, piping, electrical and emergency standby NG-powered generator and other related site work, site piping, site grading and drainage and landscape restoration and approx 450LF of 6&amp;quot; diameter PVC force main pipe &amp; other related work.B) Install underground sprinkler system for the Barker Road Pump Station with trenches up to 12&amp;quot; deep.  Equipment used trencher, shovels, rakes, picks &amp; miscellaneous hand tools.</text_data><comment_date>2014-06-19T00:00:00</comment_date></row><row _id="row-ittr~v2vi.tkay" _uuid="00000000-0000-0000-6D0D-BD50B1D5D7E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ittr~v2vi.tkay"><intent_id>553906</intent_id><project_id>693635</project_id><text_data>Excluding Irrigation Sleeving.</text_data><comment_date>2013-02-05T00:00:00</comment_date></row><row _id="row-zj23.ezmx_23u9" _uuid="00000000-0000-0000-1CAE-AAA4CCE27E68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zj23.ezmx_23u9"><intent_id>1096931</intent_id><project_id>928479</project_id><text_data>Project# 02587, Deforest, Kristin &amp; Adam,710 W 5th St, Cheney, WA 99004</text_data><comment_date>2020-10-26T00:00:00</comment_date></row><row _id="row-sim8~a7ik-8rw5" _uuid="00000000-0000-0000-A357-607995831194" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sim8~a7ik-8rw5"><intent_id>529899</intent_id><project_id>694318</project_id><text_data>a storm water retention pond was installed in 2004 and has had little or no maintenance on the bushes and sod (which is installed at the bottom). Sediment has built up at the bottom.  We have been hired to prune the bushes, grade the bottom to original specifications, and install new sod. Since there is a narrow gate all the work is done by hand; no tractors can fit through the narrow 3' gate. My work is the only work going on. Water runs into the collection pond, runs across the sod, gets cleaned by the sod, and then the now clean water continues down the storm water system but it is clean.</text_data><comment_date>2012-08-21T00:00:00</comment_date></row><row _id="row-dhrs-vfit-i924" _uuid="00000000-0000-0000-8FD2-00FE1CEC4F0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dhrs-vfit-i924"><intent_id>619267</intent_id><project_id>727023</project_id><text_data>Form filed by: Brad WeberFringe:Health &amp; Welfare $8.17 / Apprentice Fund $0.50 / NASI Pension $5.75 / Industry Promo $0.50 / SIS Pension $9.00 / Industry Training $0.05</text_data><comment_date>2014-03-07T00:00:00</comment_date></row><row _id="row-me48_nurz_f3bj" _uuid="00000000-0000-0000-DFFF-F4B91406D5C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-me48_nurz_f3bj"><intent_id>1166667</intent_id><project_id>973872</project_id><text_data>Northwest Regional DOT Remove Fallen Tree WO #83113Monarch Landscape Proposes to remove the fallen tree on the ground</text_data><comment_date>2021-08-05T00:00:00</comment_date></row><row _id="row-tvma-z9tk.82ak" _uuid="00000000-0000-0000-D434-ABF5E830FE6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tvma-z9tk.82ak"><intent_id>539154</intent_id><project_id>697608</project_id><text_data>5126710 BRAD DANIEL</text_data><comment_date>2012-10-10T00:00:00</comment_date></row><row _id="row-wamt.pamx.zpki" _uuid="00000000-0000-0000-2EC0-B3CF03AAB2FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wamt.pamx.zpki"><intent_id>496936</intent_id><project_id>681402</project_id><text_data>The work for this project consists of the following work.  This contract is for multiple sites which have different schedules but however the same work is performed, using the same tools.Turf:Mowing � using regular push mowersTrimming � using a hand held 2 hp weed wackerEdging � using a hand held 2 hp edgerFertilizing � using a walk behind fertilizer spreaderHerbicide application � using back pack sprayer 4 gallonTREES, SHRUBS AND GROUND COVER BEDSWeeding � using hula hoes, a rake to pile up and hand stuffed into a garbage bag.Trimming Ground Cover � trimming a/ pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage can.Pruning Shrubs - trimming / pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage canPre-emergent Herbicide � hand held spreaderHARD SURFACES	Sweeping � using back pack air blowers Weeds � using back pack sprayer 4 gallonOTHERLeaf Removal � Raked into piles and placed into 30 gallon garbage cans.Litter � Picked up by hand and placed into garbage bags.ANNUAL FLOWER BEDSChange Annual Color � remove existing annual color with shovels, replace with new annual color and cover new material using shovel and rake bed using hand held rakes.Fertilizer � applied using a hand held spreaderGroom Annuals � no tools, hand groomingWeeding - no tools, hand weedingHerbicide � applied using back pack sprayersIRRIGATIONSystem Start-up � small shovel to remove dirt from system.Operate System � no toolsWinterize System � air compressor is used to blow system.All work is hauled off site with a F-350 Ford Truck.</text_data><comment_date>2012-01-13T00:00:00</comment_date></row><row _id="row-bcj9~4fqz-mmn6" _uuid="00000000-0000-0000-637A-EDB4C0A90AB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bcj9~4fqz-mmn6"><intent_id>570323</intent_id><project_id>711305</project_id><text_data>Form filed by: Jacki ClaryFrom: Jacki Clary [mailto:Jacki.Clary@abm.com] Sent: Wednesday, May 15, 2013 8:26 AMTo: Pettit, Su Anne (LNI)Subject: RE: Bid due date for all contracts (8846/8852/8853/8854/8855/8856/8857/8864/8866) for 2011You are right.  The original start date was 4/1/07.So, the original bid due date was 2/15/07.Thanks.Jacki ClaryOffice ManagerABM Janitorial Services16 East Columbia Drive, Kennewick, WA  99336509-582-9776 (Office)509-948-2450 (Cell)509-582-5224 (Fax)324104 (VOIP)jclary@abm.com | www.abm.com</text_data><comment_date>2013-05-17T00:00:00</comment_date></row><row _id="row-smg3~m2bp~xskj" _uuid="00000000-0000-0000-A464-4866D2950E05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-smg3~m2bp~xskj"><intent_id>1170592</intent_id><project_id>975779</project_id><text_data>Repair - 905136 - 6000516102</text_data><comment_date>2021-08-19T00:00:00</comment_date></row><row _id="row-vnvw_2y9n-gv3u" _uuid="00000000-0000-0000-438A-EF18A32BBE66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vnvw_2y9n-gv3u"><intent_id>1227414</intent_id><project_id>991435</project_id><text_data>WRI JOB# 22.950/47962</text_data><comment_date>2022-04-21T00:00:00</comment_date></row><row _id="row-aj3k-hysc_ss64" _uuid="00000000-0000-0000-D062-F91839F155D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aj3k-hysc_ss64"><intent_id>506660</intent_id><project_id>683923</project_id><text_data>1512040</text_data><comment_date>2012-04-05T00:00:00</comment_date></row><row _id="row-s3j3-g8u9~x65m" _uuid="00000000-0000-0000-AEDF-2328F78CB0DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s3j3-g8u9~x65m"><intent_id>883928</intent_id><project_id>841723</project_id><text_data>We are a self insured company.</text_data><comment_date>2018-01-25T00:00:00</comment_date></row><row _id="row-uaqv_j79i~8vaq" _uuid="00000000-0000-0000-098C-31BD91BB8D70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uaqv_j79i~8vaq"><intent_id>958447</intent_id><project_id>829816</project_id><text_data>Hyro Seed</text_data><comment_date>2019-02-01T00:00:00</comment_date></row><row _id="row-d7ti~9pn2.n6ty" _uuid="00000000-0000-0000-5A19-B3AA3EBB232E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7ti~9pn2.n6ty"><intent_id>705422</intent_id><project_id>765449</project_id><text_data>GENERAL LABOR WORK CONSISTS OF THE FOLLOWING: 1) HAND WORK (SHOVEL WORK) NO POWER EQIIPMENT OR POWER TOOLS - $29.84(BASE) +$7.46(FRINGE)2) PILOT CAR DRIVER USED FOR MOBILIZING HEAVY EQUIPMENT TO AND FROM THE PROJECT SITE.     $29.89 (BASE) + $7.47 (FRINGE) BLADE OPERATOR IS USED FOR GRADING THE PROJECT SITE TO HELP WITH COMPACTION BEFORE PAVING OPERATIONS. OTHER TRUCKS CONSIST OF THE FOLLOWING: 1) 0-8,000 GALLON WATER TRUCK - USED FOR WATERING THE ROADWAY DURING THE GRADING PROCESS     $32.59 (BASE) + $8.15 (FRINGE) 2) OIL DISTRIBUTOR USED FOR OIL DISTR8IBUTION DURING CHIP SEALING OPERATIONS     $33.02 (BASE) + $8.25 (FRINGE)</text_data><comment_date>2015-07-06T00:00:00</comment_date></row><row _id="row-48s9.dccj.x2ew" _uuid="00000000-0000-0000-E93A-7A28C06EB91E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48s9.dccj.x2ew"><intent_id>1113884</intent_id><project_id>943130</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.    Install ductless heat pump system#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?   Yes#3 - Including any basement or garage, how many stories or levels does the structure have?    1#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure?  No (b) Any retail use in the structure?   No (c) Permanent residence only?    Yes(d) Rehabilitation house?    No(e) Transitional housing?   No (f) Communal dining facility?     No(g) Treatment services?    No(h) Assisted living services?    No(I) Dormitories?   No(j) Counseling?   No(k) Is each room and/or bed in the structure rented separately?    No(l) Other?  #5 - Does each dwelling unit have its own self-contained kitchen?    Yes#6 - Does each dwelling unit have its own bathroom?    Yes#7 - Is there a community facility or manager�s office on site?   No #8 - Is any part of the structure used by members of the public?   No</text_data><comment_date>2021-01-08T00:00:00</comment_date></row><row _id="row-35p5~zptc.hztk" _uuid="00000000-0000-0000-B507-1F2CF523AF06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-35p5~zptc.hztk"><intent_id>1213254</intent_id><project_id>1000586</project_id><text_data>City contract number will be provided at a later date.</text_data><comment_date>2022-02-22T00:00:00</comment_date></row><row _id="row-7af4.w7da_rksk" _uuid="00000000-0000-0000-0CA0-08E9962B5766" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7af4.w7da_rksk"><intent_id>1283450</intent_id><project_id>1040804</project_id><text_data>PROVIDE AND INSTALL CAT 6 CABLES</text_data><comment_date>2022-11-14T00:00:00</comment_date></row><row _id="row-kecw-6csi-cg6y" _uuid="00000000-0000-0000-80F2-60E646055351" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kecw-6csi-cg6y"><intent_id>660036</intent_id><project_id>740263</project_id><text_data>Form filed by:  Gary Liles</text_data><comment_date>2014-10-13T00:00:00</comment_date></row><row _id="row-jazc_9m3c_ibcd" _uuid="00000000-0000-0000-1EB5-E6EE37DB7931" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jazc_9m3c_ibcd"><intent_id>586640</intent_id><project_id>717398</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) will perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-09-12T00:00:00</comment_date></row><row _id="row-rhr4.adw3~4x9s" _uuid="00000000-0000-0000-579D-FE3EB19BF950" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rhr4.adw3~4x9s"><intent_id>916937</intent_id><project_id>852864</project_id><text_data>Job #115670-001</text_data><comment_date>2018-07-10T00:00:00</comment_date></row><row _id="row-sizd~s947_seij" _uuid="00000000-0000-0000-FA60-E015DBA634A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sizd~s947_seij"><intent_id>537566</intent_id><project_id>697040</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-09T00:00:00</comment_date></row><row _id="row-dznq~rf8f-mhq9" _uuid="00000000-0000-0000-CAFA-F184D143BD0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dznq~rf8f-mhq9"><intent_id>1085274</intent_id><project_id>931388</project_id><text_data>PTI SO 156395</text_data><comment_date>2020-09-02T00:00:00</comment_date></row><row _id="row-2hew-9rsu_zyyd" _uuid="00000000-0000-0000-AA14-0F46CD7AC0AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2hew-9rsu_zyyd"><intent_id>1245584</intent_id><project_id>1020054</project_id><text_data>'Other Trucks' = Lowbed, mobilization of equipment (Teamster's Union)'General Laborer' = Hand shovel rock and asphalt (Laborer's Union)</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-zjcd~kj75-g7px" _uuid="00000000-0000-0000-00D7-3A3CA4DCC8F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zjcd~kj75-g7px"><intent_id>948066</intent_id><project_id>867500</project_id><text_data>Install new outside air sensor - mount and cable in customer provided sensor. Locate and label six existing Cat5e cables. Extend existing Cat5e cable via a new Cat5e cable terminated at both ends with surface mount boxes. Provide and install a 1&amp;quot; conduit between two existing jay boxes. Add data and HDMI cable to support services.</text_data><comment_date>2018-11-29T00:00:00</comment_date></row><row _id="row-jtj2_fid4-7z8b" _uuid="00000000-0000-0000-D357-C6F20E13D82F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jtj2_fid4-7z8b"><intent_id>1240038</intent_id><project_id>986780</project_id><text_data>Some of the tools that will be used are, shovels, brooms, masking tape, wheel barrows, measuring Tapes, Levels, and other safety equipment to keep the children, workers and public safe.</text_data><comment_date>2022-06-09T00:00:00</comment_date></row><row _id="row-fput_kdkq-wkdt" _uuid="00000000-0000-0000-E988-27DAB43DC6ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fput_kdkq-wkdt"><intent_id>1465823</intent_id><project_id>1119629</project_id><text_data>Provide grading, striping and rework of multiple parking lots to ensure ADA Compliance and installation of new ADA stalls.</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-cutw_drgn~9trw" _uuid="00000000-0000-0000-7EBC-E3C39F85E5B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cutw_drgn~9trw"><intent_id>798500</intent_id><project_id>805949</project_id><text_data>#1 Replace bath fan. #2 Single family dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2016-10-28T00:00:00</comment_date></row><row _id="row-hjdt~7qbi_acrf" _uuid="00000000-0000-0000-4FB1-49E414566018" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjdt~7qbi_acrf"><intent_id>1184246</intent_id><project_id>982920</project_id><text_data>Truck Driver rate is paid to employees driving company issued trucks to transport materials/supplies pertaining to the job site.</text_data><comment_date>2021-10-08T00:00:00</comment_date></row><row _id="row-pxyy.re43.399h" _uuid="00000000-0000-0000-A2E2-1B5CF02BEB85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pxyy.re43.399h"><intent_id>1037763</intent_id><project_id>906856</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a - no; 4b - no; 4c - yes; 4d - no; 4e - no; 4f - no; 4g - no; 4h - no; 4i - no; 4j - no; 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2020-02-12T00:00:00</comment_date></row><row _id="row-42t7-f2a9_i24c" _uuid="00000000-0000-0000-89EF-FE6A21DC9C21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-42t7-f2a9_i24c"><intent_id>595753</intent_id><project_id>720701</project_id><text_data>Truck Drivers are 10 to 12 yard end dump trucks, they haul rock and asphalt for paving and road construction.  Truck and pup drivers haul 20 to 24 yards.  They are also end dump and haul rock and asphalt for highway paving and road construction. Other Truck is 0-8,000 gallon water trucks used for asphalt paving to fill finish rollers on the job.  General laborers manually shovel rock and asphalt at the job sites on highway paving and road construction jobs.  They do not operated machinery or vehicles while shoveling rock and or asphalt.</text_data><comment_date>2013-09-25T00:00:00</comment_date></row><row _id="row-k3hj_wruf.dxt6" _uuid="00000000-0000-0000-91AC-752DEF11D5F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3hj_wruf.dxt6"><intent_id>690822</intent_id><project_id>760711</project_id><text_data>West Precinct Arc Flash Study</text_data><comment_date>2015-04-24T00:00:00</comment_date></row><row _id="row-2xxi-6ib5~js9q" _uuid="00000000-0000-0000-9DD5-D86C1D8C2554" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2xxi-6ib5~js9q"><intent_id>540217</intent_id><project_id>695899</project_id><text_data>We are installing gutters on the building (sheet metal workers).</text_data><comment_date>2012-10-30T00:00:00</comment_date></row><row _id="row-k6mc~cxqa.5zrj" _uuid="00000000-0000-0000-CE9E-92CB319332D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k6mc~cxqa.5zrj"><intent_id>1102419</intent_id><project_id>939488</project_id><text_data>TRUCK DRIVER - OTHER' USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK</text_data><comment_date>2020-11-10T00:00:00</comment_date></row><row _id="row-9zu4-dzqq~8g6n" _uuid="00000000-0000-0000-FED1-1925B5B6626F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9zu4-dzqq~8g6n"><intent_id>992137</intent_id><project_id>887324</project_id><text_data>This work will utilize our large bucket truck, 1 brush hog feeder and 2 flaggers.</text_data><comment_date>2019-07-16T00:00:00</comment_date></row><row _id="row-h2ht~f35r-25dp" _uuid="00000000-0000-0000-154F-0A0D75A2BE4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2ht~f35r-25dp"><intent_id>610962</intent_id><project_id>726853</project_id><text_data>Filed by Austin Wells.</text_data><comment_date>2014-01-07T00:00:00</comment_date></row><row _id="row-zh4m_v83j_ihrk" _uuid="00000000-0000-0000-D6B0-8EBA96668F0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zh4m_v83j_ihrk"><intent_id>624908</intent_id><project_id>732281</project_id><text_data>Per Gilbert, this project is hourly. He estimates the contract amount to be $3000.</text_data><comment_date>2014-04-15T00:00:00</comment_date></row><row _id="row-3b6p.fnr9~a589" _uuid="00000000-0000-0000-40CD-A552DF9408BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3b6p.fnr9~a589"><intent_id>576393</intent_id><project_id>713706</project_id><text_data>Mt West Employees are residents of IDAHO and are covered by IDAHO STATE FUND workers insurance.</text_data><comment_date>2013-06-19T00:00:00</comment_date></row><row _id="row-4nuc_g8xq_9ri5" _uuid="00000000-0000-0000-71BC-243F843919E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4nuc_g8xq_9ri5"><intent_id>822194</intent_id><project_id>781448</project_id><text_data>This project is exempt from the payment of state prevailing wages based on The Housing Act of 1937 and 24 CFR 965.101, and that we will pay the workers properly in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2017-04-10T00:00:00</comment_date></row><row _id="row-vuts.erfd~uraj" _uuid="00000000-0000-0000-F42B-D49AE7850CF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vuts.erfd~uraj"><intent_id>743630</intent_id><project_id>783648</project_id><text_data>General Laborer duties are assisting with hoses, and shoveling.</text_data><comment_date>2016-01-26T00:00:00</comment_date></row><row _id="row-3b6a~m95t-jegs" _uuid="00000000-0000-0000-A0E5-7878614FEA32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3b6a~m95t-jegs"><intent_id>1205458</intent_id><project_id>995780</project_id><comment_date>2022-02-07T00:00:00</comment_date></row><row _id="row-p8au-rtcs-x53r" _uuid="00000000-0000-0000-C00D-165079997596" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p8au-rtcs-x53r"><intent_id>1128960</intent_id><project_id>954380</project_id><text_data>WM will subcontract NRC to provide transportation</text_data><comment_date>2021-03-16T00:00:00</comment_date></row><row _id="row-3qzq-p2e4.tw2n" _uuid="00000000-0000-0000-3323-79462128E74F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3qzq-p2e4.tw2n"><intent_id>607960</intent_id><project_id>725382</project_id><text_data>All address are locate in the city of Tacoma.1. John Boyes   3835 East Spokane Street2. Sylvia Ware   919 East 52nd Street3. Epitacio Garibay   5025 South Trafton Street4. Dawn Gustafson   6125 South Yakima Avenue5. Cathy Pirtle   7006 South Puget Sound Avenue</text_data><comment_date>2013-12-11T00:00:00</comment_date></row><row _id="row-pqq5_gvga.2upw" _uuid="00000000-0000-0000-CE14-80955A2A07E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqq5_gvga.2upw"><intent_id>750499</intent_id><project_id>781311</project_id><text_data>Other Trucks (E.WA - 690) Water Truck 4,000 gallon tank</text_data><comment_date>2016-03-09T00:00:00</comment_date></row><row _id="row-wprz_8rbt-z32t" _uuid="00000000-0000-0000-A16E-6EABD43D9C4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wprz_8rbt-z32t"><intent_id>1137835</intent_id><project_id>959252</project_id><text_data>SERVICE TECH WENT TO SERVICE MACHINE AND DIAGNOSE</text_data><comment_date>2021-04-22T00:00:00</comment_date></row><row _id="row-yegy-d6mi~gw9x" _uuid="00000000-0000-0000-0B2F-DA740CB4814C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yegy-d6mi~gw9x"><intent_id>1240116</intent_id><project_id>1016961</project_id><text_data>Contract begins 4/1/2022 ends 3/31/2027 - 5 year test and inspection service agreement</text_data><comment_date>2022-06-09T00:00:00</comment_date></row><row _id="row-gdd6.h6pv.sg8q" _uuid="00000000-0000-0000-718A-13AE5717F2DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gdd6.h6pv.sg8q"><intent_id>748042</intent_id><project_id>748148</project_id><text_data>this is a new landscape of a new addition to a hospital. we will be installing topsoil with small loaders and using 2 ton dump trucks as necessary. we will alo be using small mini track hoes to dig in sporinkler system and plant trees and plants as needed. there is no drainage ditched to the project, we are installing bio infiltration soil to numerous planters, we will be installing new sod and having hydroseeding work installed.</text_data><comment_date>2016-02-23T00:00:00</comment_date></row><row _id="row-6uns~n399_jwww" _uuid="00000000-0000-0000-A618-17A55ABA0391" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6uns~n399_jwww"><intent_id>1083129</intent_id><project_id>930370</project_id><text_data>New Intent allows for subcontractors</text_data><comment_date>2020-08-26T00:00:00</comment_date></row><row _id="row-5nrj~wryq~wary" _uuid="00000000-0000-0000-FAE7-41A1D9C46B40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5nrj~wryq~wary"><intent_id>768033</intent_id><project_id>794331</project_id><text_data>If you have any questions please contact Cynthia Balzarini, Dale, or Bruce Gardener at 253-583-7350. They are my supervisors on these projects.</text_data><comment_date>2016-06-14T00:00:00</comment_date></row><row _id="row-74du_h38v~cjkd" _uuid="00000000-0000-0000-3AA3-D56272027C13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74du_h38v~cjkd"><intent_id>625252</intent_id><project_id>733129</project_id><text_data>Complete and trim out 45 Ethernet telephone wire drops and relocate 1 other Ethernet telephone wire run within the hospital building</text_data><comment_date>2014-04-16T00:00:00</comment_date></row><row _id="row-5exf_p3c5.is86" _uuid="00000000-0000-0000-36DB-7275ECC8DAB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5exf_p3c5.is86"><intent_id>739378</intent_id><project_id>781581</project_id><text_data>sr34227126</text_data><comment_date>2015-12-29T00:00:00</comment_date></row><row _id="row-wwmk~eyvj.fmfk" _uuid="00000000-0000-0000-4DFE-C91A1BB20549" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wwmk~eyvj.fmfk"><intent_id>923142</intent_id><project_id>857777</project_id><text_data>1)TUNE UP FURNACE &amp; H2O HEATER2)SINGLE FAMILY3)1 STY + BSMT4)a-no b-no c-yes d-no e-no f-no g-no h-no I-no j-no k-none5)YES6)YES7)NO8)NO</text_data><comment_date>2018-08-03T00:00:00</comment_date></row><row _id="row-i6ea~8xid~43pt" _uuid="00000000-0000-0000-BF2F-BD770BB7E379" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i6ea~8xid~43pt"><intent_id>1318515</intent_id><project_id>1062668</project_id><text_data>inside workelect tech(06)add new workstation drops to classrooms 221 and 301</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-g424~vv6f_yrke" _uuid="00000000-0000-0000-8260-4096297D2C84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g424~vv6f_yrke"><intent_id>877302</intent_id><project_id>838569</project_id><text_data>Maintenance of existing electrical systems</text_data><comment_date>2017-12-01T00:00:00</comment_date></row><row _id="row-gx4u~q2d2-2gtv" _uuid="00000000-0000-0000-CE8A-3BBE7541EA9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gx4u~q2d2-2gtv"><intent_id>531065</intent_id><project_id>694730</project_id><text_data>Please Call Cynthia Gracey with any questions or concerns at 253-255-7521. Or Keith Weber at 253-606-7168 Thank you Robert Smith</text_data><comment_date>2012-08-27T00:00:00</comment_date></row><row _id="row-qixr.gwrk-yj62" _uuid="00000000-0000-0000-39B1-3931045CF07C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qixr.gwrk-yj62"><intent_id>804077</intent_id><project_id>795173</project_id><text_data>The following Note is being added per Elsa in the P wage unit at L &amp; I -prior to 10/8/2016 the intent will be filed under labor Ready Northwest, Inc our Industrial insurance number for that account is 58671101 and has not changed.  Nothing has changed for work done prior to 10/8 and should be filed under Labor Ready North West.After 10/8/2016 Labor ready and CLP Resources has merged and there new name is People Ready. We have set up a new account to enter all work done after 10/8 with the new industrial insurance number 58671101-11.  The UBI number for Labor Ready is 601898140, and for People Ready 601898135. The last correction set to us was to notify Cassandra Smith, we contacted her and she can not assist us, she directed us back to P wage Unit.</text_data><comment_date>2016-12-13T00:00:00</comment_date></row><row _id="row-dui4_v4tu_zh9e" _uuid="00000000-0000-0000-F6D2-79ACAA7C9EE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dui4_v4tu_zh9e"><intent_id>870898</intent_id><project_id>799659</project_id><text_data>Filed by Keldy A Ney</text_data><comment_date>2017-10-24T00:00:00</comment_date></row><row _id="row-b9gh.86if_gqdm" _uuid="00000000-0000-0000-E01E-20DF58EA31F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9gh.86if_gqdm"><intent_id>588642</intent_id><project_id>712764</project_id><text_data>295547 Hwy 101Quilcene, WA 98376</text_data><comment_date>2013-08-20T00:00:00</comment_date></row><row _id="row-jx36~p372_3ehb" _uuid="00000000-0000-0000-8C53-CB1EB57ECE59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jx36~p372_3ehb"><intent_id>925154</intent_id><project_id>858536</project_id><text_data>Other Trucks - Equipment Haul using a Kenworth 6x4 Bogie Axle 56,000 GVW Diesel</text_data><comment_date>2018-08-13T00:00:00</comment_date></row><row _id="row-2455-2x2e_2fx3" _uuid="00000000-0000-0000-8D22-1259E0901147" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2455-2x2e_2fx3"><intent_id>810289</intent_id><project_id>794967</project_id><text_data>no notes to enter</text_data><comment_date>2017-01-09T00:00:00</comment_date></row><row _id="row-tv6v.aa7z~vs5n" _uuid="00000000-0000-0000-6FD1-A7586C865D80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tv6v.aa7z~vs5n"><intent_id>1031058</intent_id><project_id>887036</project_id><text_data>health and welfare 15.725 pension 10.21 education .63 work preservation fund .48 annuity 8.20 vacation 6% under 5 years or 8 % over 5 years</text_data><comment_date>2020-01-10T00:00:00</comment_date></row><row _id="row-pszz-rc59_tyd6" _uuid="00000000-0000-0000-9B16-94EB79445C37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pszz-rc59_tyd6"><intent_id>1224822</intent_id><project_id>973204</project_id><text_data>0322020</text_data><comment_date>2022-04-12T00:00:00</comment_date></row><row _id="row-9y26.hqn9-9ad7" _uuid="00000000-0000-0000-D91B-B3AE2A795C7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9y26.hqn9-9ad7"><intent_id>1196047</intent_id><project_id>989684</project_id><text_data>353406</text_data><comment_date>2021-11-30T00:00:00</comment_date></row><row _id="row-w4jk~586e-5xsy" _uuid="00000000-0000-0000-C71F-A46C44C7A7B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w4jk~586e-5xsy"><intent_id>660663</intent_id><project_id>746736</project_id><text_data>MMFS Job#73146912/Invoice #JC23897</text_data><comment_date>2014-10-16T00:00:00</comment_date></row><row _id="row-abx6.3ub8~84zr" _uuid="00000000-0000-0000-8A6F-31FA7C269826" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-abx6.3ub8~84zr"><intent_id>1213412</intent_id><project_id>1000690</project_id><comment_date>2022-02-23T00:00:00</comment_date></row><row _id="row-b26m_88zx.d7wa" _uuid="00000000-0000-0000-39EC-5658FE5CBC4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b26m_88zx.d7wa"><intent_id>725502</intent_id><project_id>771506</project_id><text_data>This was filed 9-16 but ended up under H &amp; H and not Customer Electric. This is a re-filing.  The notes are not coming through.Hook up furnace and water heater for the following:3138 E. 15th Ave, Spokane, WA 99213709 S. Ralph, Spokane, WA 99202</text_data><comment_date>2015-10-09T00:00:00</comment_date></row><row _id="row-akij-i6gm-hm8z" _uuid="00000000-0000-0000-5B95-4B923CDA4521" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-akij-i6gm-hm8z"><intent_id>959873</intent_id><project_id>870045</project_id><text_data>1. Install Panosonic bath fan with smart switch. 2. Single Family. 3. Single story. 4a. no. 4b. no. 4c. yes. 4d. no. 4e. no 4f. no 4g. no 4h. no. 4i. no 4j. no 4k. no. i. na. 5. yes. 6. yes. 7. no. 8. No</text_data><comment_date>2019-02-12T00:00:00</comment_date></row><row _id="row-gkdh-8vrp.f3r6" _uuid="00000000-0000-0000-94DD-A834819D8014" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gkdh-8vrp.f3r6"><intent_id>1238186</intent_id><project_id>963758</project_id><text_data>Stoneway Concrete is a Material Supplier</text_data><comment_date>2022-06-02T00:00:00</comment_date></row><row _id="row-a874~tinm~xwme" _uuid="00000000-0000-0000-6E84-F146659A86BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a874~tinm~xwme"><intent_id>898623</intent_id><project_id>848330</project_id><text_data>Blythe w/o #85434^</text_data><comment_date>2018-04-13T00:00:00</comment_date></row><row _id="row-x9k7-99xq-s4xj" _uuid="00000000-0000-0000-2BDF-B5EF285E0B7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x9k7-99xq-s4xj"><intent_id>668139</intent_id><project_id>749939</project_id><text_data>Several manufactured homes within the Noble Firs Estates MHP		#1 - Install Floor Insulation #2 - Single family manufactured home #3 - 1 level #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - Unknown #8 - No</text_data><comment_date>2014-12-02T00:00:00</comment_date></row><row _id="row-2ty2_szg5~cw2v" _uuid="00000000-0000-0000-E471-58206D9694AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ty2_szg5~cw2v"><intent_id>613434</intent_id><project_id>727927</project_id><text_data>Vegetation control to various parcels on Port of Camas, Washougal property. Spray vegetation control products to non-desirable vegetation as listed by contract, using power sprayers and hand sprayers as needed to control non-desirable vegetation. Pre and post emergent weed control treatment using various herbicides. Purpose is to control unwanted vegetation growth which can be unsightly, harm existing plant material and create a public nuisance. Equipment used is a truck mounted sprayer and back pack sprayer.</text_data><comment_date>2014-01-27T00:00:00</comment_date></row><row _id="row-79zz.6bgm_prm4" _uuid="00000000-0000-0000-CD0B-D192E8085888" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-79zz.6bgm_prm4"><intent_id>1317386</intent_id><project_id>960205</project_id><text_data>We hired sub tier contractor, Speer Taps, their UBI is 600491975.</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-5mz7_afbh_i37x" _uuid="00000000-0000-0000-8253-69A0116CD4DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5mz7_afbh_i37x"><intent_id>694748</intent_id><project_id>756754</project_id><text_data>for resale 2705 sales tax area</text_data><comment_date>2015-05-15T00:00:00</comment_date></row><row _id="row-qifi_p9iu-82ny" _uuid="00000000-0000-0000-D274-91547EF7BC1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qifi_p9iu-82ny"><intent_id>737164</intent_id><project_id>780559</project_id><text_data>Filed by Neil Hendricks</text_data><comment_date>2015-12-10T00:00:00</comment_date></row><row _id="row-ij96.sy5w~kyrh" _uuid="00000000-0000-0000-4663-99FAE3F2D22E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ij96.sy5w~kyrh"><intent_id>1217073</intent_id><project_id>1003098</project_id><text_data>A high water bill was noted by property management for home at 617 SE 132nd Ave, Vancouver, WA 98683. The service provided by my company is to locate the source of constant water usage so that the appropriate contractor can be hired to access and repair. Inspection of the water meter will indicate if constant water usage is occurring at this property. Inspection of the unit will indicate if constant usage is due to a toilet or other fixtures. If no usage is found inside the unit a leak on the supply line between the meter and the unit will be indicated.Underground leaks are located using a SebaKMT Hydrolux 6000 sonic leak locating device. This device picks up the sound signature of an underground leak. Once located the spot is marked with a blue X or flag.Once marked, the awarding agency hires a separate entity to access and repair the leak.</text_data><comment_date>2022-04-05T00:00:00</comment_date></row><row _id="row-mqx5~acjh-wbh6" _uuid="00000000-0000-0000-F7CF-AD28B0E84454" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mqx5~acjh-wbh6"><intent_id>908822</intent_id><project_id>849886</project_id><text_data>181153-Per WAC -296-127-01378 Telecommunication Technician will be installing cabling for telephone and computers for internet access. Backbone cabling for connectivity between MDF &amp; IDF. Terminate test and label.</text_data><comment_date>2018-06-04T00:00:00</comment_date></row><row _id="row-hvip-nkdc_x3ia" _uuid="00000000-0000-0000-7212-9FD0C0E31780" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hvip-nkdc_x3ia"><intent_id>1124495</intent_id><project_id>946619</project_id><text_data>Our general laborers unload and distribute cabinets from our delivery truck to various rooms on the jobsite. The only tools used are hand trucks and rolling carts.Our trucks are 14� and 26� box trucks for delivery of cabinets.</text_data><comment_date>2021-02-24T00:00:00</comment_date></row><row _id="row-ykeq-kuu3.v2dy" _uuid="00000000-0000-0000-B74E-AF1F79535CFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ykeq-kuu3.v2dy"><intent_id>657238</intent_id><project_id>740463</project_id><text_data>Form filed by: AL Morton</text_data><comment_date>2014-09-26T00:00:00</comment_date></row><row _id="row-nbcv~vdfg_d2rd" _uuid="00000000-0000-0000-D434-EEB1FD863016" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nbcv~vdfg_d2rd"><intent_id>1214065</intent_id><project_id>1001102</project_id><text_data>#1-We were contracted to REPAIR furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2022-02-25T00:00:00</comment_date></row><row _id="row-wizf-wgf2_2vsi" _uuid="00000000-0000-0000-390E-F40C020664AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wizf-wgf2_2vsi"><intent_id>612483</intent_id><project_id>714543</project_id><text_data>Laborers will be operating man-lift, fork-lift, scissor-lift type equipment.  Preparing job-site daily for expected sheet metal work.</text_data><comment_date>2014-02-02T00:00:00</comment_date></row><row _id="row-h9gs_6whn-kj8t" _uuid="00000000-0000-0000-60ED-13B90A6DF653" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h9gs_6whn-kj8t"><intent_id>546241</intent_id><project_id>691683</project_id><text_data>We were a sub on this job for two days, were just told by the general contractor we had to file an intent.</text_data><comment_date>2012-11-28T00:00:00</comment_date></row><row _id="row-taii_w9bw_azp6" _uuid="00000000-0000-0000-BA38-2FB4910610BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-taii_w9bw_azp6"><intent_id>1218582</intent_id><project_id>1004112</project_id><text_data>P22-NVSD</text_data><comment_date>2022-03-17T00:00:00</comment_date></row><row _id="row-998h_pg8p.kxbs" _uuid="00000000-0000-0000-32D1-968AC3EB17CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-998h_pg8p.kxbs"><intent_id>847192</intent_id><project_id>827015</project_id><text_data>Filed by Wilburn M. Gee</text_data><comment_date>2017-07-13T00:00:00</comment_date></row><row _id="row-vrxv_u5q9-cf52" _uuid="00000000-0000-0000-E7E2-D2C12E5A8BAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vrxv_u5q9-cf52"><intent_id>763873</intent_id><project_id>791305</project_id><text_data>1)annual maintenance of wood stove, 2) single family, 3) 1 , 4) residential, no, no, yes,no, yes, no, no, no, no, no, no, 5) yes as a single swelling house, 6)the house has a bathroom, 7) no, 8)no</text_data><comment_date>2016-05-23T00:00:00</comment_date></row><row _id="row-m6b6~kd2w-p4gw" _uuid="00000000-0000-0000-A998-B8B8E9056BA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6b6~kd2w-p4gw"><intent_id>859341</intent_id><project_id>831299</project_id><text_data>KCDA</text_data><comment_date>2017-08-29T00:00:00</comment_date></row><row _id="row-e2mw~299a-5f65" _uuid="00000000-0000-0000-0A8D-2DC046121735" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e2mw~299a-5f65"><intent_id>1111925</intent_id><project_id>936950</project_id><text_data>PPC #20535</text_data><comment_date>2020-12-27T00:00:00</comment_date></row><row _id="row-6msz~yk74-jbhb" _uuid="00000000-0000-0000-2986-79712321A9E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6msz~yk74-jbhb"><intent_id>490908</intent_id><project_id>677246</project_id><text_data>Employee will be cleaning up the site and running tools to and from equipment van. This is the same employee performing all three duties during the  course of this job.</text_data><comment_date>2011-11-30T00:00:00</comment_date></row><row _id="row-xye9-zry9.z9vd" _uuid="00000000-0000-0000-896E-AF7AB84587C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xye9-zry9.z9vd"><intent_id>782264</intent_id><project_id>798467</project_id><text_data>1. Install bath fan2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. No</text_data><comment_date>2016-08-15T00:00:00</comment_date></row><row _id="row-tbn8~8ueq.j26x" _uuid="00000000-0000-0000-5DEC-FF543DC2699B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tbn8~8ueq.j26x"><intent_id>579084</intent_id><project_id>698909</project_id><text_data>Truck Driver is picking up and moving Drop Boxes from location a to loation b. The truck is a Tandem Axle with a solo weight of 54,000lbs.</text_data><comment_date>2013-07-12T00:00:00</comment_date></row><row _id="row-y5hm_v3vx-pmzk" _uuid="00000000-0000-0000-3810-00100D33B91B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5hm_v3vx-pmzk"><intent_id>1318704</intent_id><project_id>1062767</project_id><text_data>W1514002 - Intent</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-zazc.a6sf_9hm6" _uuid="00000000-0000-0000-E30F-D65B1D811E06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zazc.a6sf_9hm6"><intent_id>1317575</intent_id><project_id>1045916</project_id><text_data>GU Job #23099Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-3gtr-53eh_r74a" _uuid="00000000-0000-0000-563A-4F65A7FCCD5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gtr-53eh_r74a"><intent_id>791350</intent_id><project_id>801372</project_id><text_data>We have hired Speer Taps Inc.(UBI: 600491975) as a sub-tier contractor on this project who will be performing all work.</text_data><comment_date>2016-09-23T00:00:00</comment_date></row><row _id="row-syth~za6k~dct3" _uuid="00000000-0000-0000-CA2E-9E5581F2CDE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-syth~za6k~dct3"><intent_id>1279080</intent_id><project_id>1018808</project_id><text_data>Job # 27136222203 � Taylor's Landing Park</text_data><comment_date>2022-11-01T00:00:00</comment_date></row><row _id="row-dumj_ww5s~f5wr" _uuid="00000000-0000-0000-EA3E-48242C6B7814" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dumj_ww5s~f5wr"><intent_id>851050</intent_id><project_id>828540</project_id><text_data>Repair NWESD parking lot, concrete slab, curb,and sidewalk</text_data><comment_date>2017-07-28T00:00:00</comment_date></row><row _id="row-uvms~d9cn~tfsz" _uuid="00000000-0000-0000-CB58-695B33336AA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uvms~d9cn~tfsz"><intent_id>543668</intent_id><project_id>698772</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR DRIVER - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH OIL/TACK PRIOR TO PLACING ASPHALT</text_data><comment_date>2012-11-08T00:00:00</comment_date></row><row _id="row-pvqq~9ejk-8im5" _uuid="00000000-0000-0000-0D81-69845BE1F241" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pvqq~9ejk-8im5"><intent_id>1203268</intent_id><project_id>934767</project_id><text_data>Pull 24 strand fiber and 100 pair copper back 1 pole span. Locate existing conduit. Extend 4' PVC on standoff brackets at pole. Dig up existing conduit and install sweeps. Install 24'x36' vault on top of conduit. Route existing cables into vault. Pull new 24 strand fiber and 100 pair copper to communications room in building. Install a splice can for fiber and a splice can for copper in vault. Splice 24 strands of fiber and 100 pair copper. Install fiber enclosure in communications room and terminate 24 strands of fiber. Terminate 100 pair to 66 blocks.</text_data><comment_date>2022-01-07T00:00:00</comment_date></row><row _id="row-z8kr_gkyj~dyd6" _uuid="00000000-0000-0000-2A2B-6B29EE2D276D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z8kr_gkyj~dyd6"><intent_id>583203</intent_id><project_id>713881</project_id><text_data>Evan Serrill #906107 65%.</text_data><comment_date>2013-07-24T00:00:00</comment_date></row><row _id="row-w6gr.k4ec_w4gv" _uuid="00000000-0000-0000-1755-86B14B968E51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w6gr.k4ec_w4gv"><intent_id>1273175</intent_id><project_id>1034560</project_id><text_data>Blythe PM220230</text_data><comment_date>2022-10-09T00:00:00</comment_date></row><row _id="row-24vf_rz6y.nsqw" _uuid="00000000-0000-0000-9AD1-42D31D94BA40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-24vf_rz6y.nsqw"><intent_id>1102764</intent_id><project_id>938960</project_id><text_data>Changed answer to the question regarding whether we would be subcontractors so that exemption from prevailing wage is applied.  the pop up note.said in order to exempt from prevailing wage that the answer to the question should be 'yes'</text_data><comment_date>2021-10-15T00:00:00</comment_date></row><row _id="row-jif6-xpnw.6fgs" _uuid="00000000-0000-0000-F714-6FA401051A74" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jif6-xpnw.6fgs"><intent_id>895856</intent_id><project_id>847155</project_id><text_data>WO# 4679</text_data><comment_date>2018-03-30T00:00:00</comment_date></row><row _id="row-c58p~b42h_pjen" _uuid="00000000-0000-0000-4396-C7CBE7235CA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c58p~b42h_pjen"><intent_id>992941</intent_id><project_id>868186</project_id><text_data>Our employees have been paid no less than $19.00 per hour.</text_data><comment_date>2019-08-14T00:00:00</comment_date></row><row _id="row-p6g4_4975-iwyh" _uuid="00000000-0000-0000-E473-DA194CD2D474" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p6g4_4975-iwyh"><intent_id>1001159</intent_id><project_id>859806</project_id><text_data>HIRED BY MORENO &amp; NELSON CONSTRUCTION</text_data><comment_date>2019-08-20T00:00:00</comment_date></row><row _id="row-z7c3_shqg_586q" _uuid="00000000-0000-0000-0B03-DD10F217519F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7c3_shqg_586q"><intent_id>874472</intent_id><project_id>837327</project_id><text_data>PC6 - Job #902-20Invoice #6501107CE</text_data><comment_date>2017-11-13T00:00:00</comment_date></row><row _id="row-hm72~872a.ks8y" _uuid="00000000-0000-0000-E4B3-4188505E7BA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hm72~872a.ks8y"><intent_id>678531</intent_id><project_id>755407</project_id><text_data>Job # 9023267</text_data><comment_date>2015-02-10T00:00:00</comment_date></row><row _id="row-rjvh_eeb9.nvyr" _uuid="00000000-0000-0000-018B-EE7594F1489D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rjvh_eeb9.nvyr"><intent_id>540577</intent_id><project_id>693635</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site.</text_data><comment_date>2012-10-18T00:00:00</comment_date></row><row _id="row-7me2-5at9~nage" _uuid="00000000-0000-0000-BE1D-33AC3F46412B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7me2-5at9~nage"><intent_id>771149</intent_id><project_id>793144</project_id><text_data>1 drain cleaning 2 single 3 n/a 4 a no b no c yes d no e no f no g no h no i no j no 5yes 6 yes 7 no 8 no</text_data><comment_date>2016-06-27T00:00:00</comment_date></row><row _id="row-emkr-fhcg.qrt6" _uuid="00000000-0000-0000-8477-F3B498CEBE24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-emkr-fhcg.qrt6"><intent_id>542290</intent_id><project_id>698804</project_id><text_data>Installation of playchips thru a 4&amp;quot; hoses by a blower truck.</text_data><comment_date>2012-10-30T00:00:00</comment_date></row><row _id="row-ri8s-ht25_drxe" _uuid="00000000-0000-0000-5118-2BE100E3ED8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ri8s-ht25_drxe"><intent_id>663531</intent_id><project_id>745218</project_id><text_data>We are a subcontract. Our portion of the work is to do the final seeding, seeding of disturbed areas. We will be using our hydroseeder.</text_data><comment_date>2014-10-31T00:00:00</comment_date></row><row _id="row-ssam.gsj5.8iqr" _uuid="00000000-0000-0000-187A-B93142F066DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ssam.gsj5.8iqr"><intent_id>904688</intent_id><project_id>850757</project_id><text_data>Install 145 Cubic Yards of Mulch in and around the property in designated landscape bedsAreas will be blown down and left free of debris</text_data><comment_date>2018-05-15T00:00:00</comment_date></row><row _id="row-8fh4~5gg9~8a2t" _uuid="00000000-0000-0000-6D6F-77628755B84C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8fh4~5gg9~8a2t"><intent_id>539509</intent_id><project_id>697734</project_id><text_data>An e-mail was sent to your company on 10/1/12, requesting additional information on your method for calculating the hourly rate of usual benefits.  Please note that we are waiting for a response to this request for clarification in order to evaluate how to proceed with forms from your company which state a high fringe amount.  For further information, please contact the prevailing wage program at (360) 902-5334.</text_data><comment_date>2012-12-18T00:00:00</comment_date></row><row _id="row-sj98~4tzg.jdan" _uuid="00000000-0000-0000-5CE0-FB81C97E3027" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sj98~4tzg.jdan"><intent_id>1121641</intent_id><project_id>902594</project_id><text_data>install heating system and ductwork and charging of system community vetrans village 1community village for homeless vetrans community kitchen2 community bathrooms1 laundtry, 1 kitchen 1 multipurpose 1storage 2 office 1 living/dining</text_data><comment_date>2021-03-12T00:00:00</comment_date></row><row _id="row-cvr6_sj5h.a8cv" _uuid="00000000-0000-0000-4DEE-DEAC4B8C3054" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cvr6_sj5h.a8cv"><intent_id>669069</intent_id><project_id>749929</project_id><text_data>This is to repair damage to an outdoor learning center that caught on fire.  They had to clean up the building and then re-insulate.  We did not use insulators for this, as it was a small job, so we used general laborer employees. No special equipment was needed.</text_data><comment_date>2015-01-05T00:00:00</comment_date></row><row _id="row-yfie-ietn_2s4k" _uuid="00000000-0000-0000-96B5-B3FB210FC66C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yfie-ietn_2s4k"><intent_id>636031</intent_id><project_id>729262</project_id><text_data>Pace 2103 W Prasch #410184</text_data><comment_date>2014-06-18T00:00:00</comment_date></row><row _id="row-dpm9-2hx8~yp5f" _uuid="00000000-0000-0000-8D5B-FBF30EEC4219" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpm9-2hx8~yp5f"><intent_id>538497</intent_id><project_id>697362</project_id><text_data>Blairco Project Number 12-5073</text_data><comment_date>2012-10-05T00:00:00</comment_date></row><row _id="row-wa2s_999y-mm7w" _uuid="00000000-0000-0000-F473-53A055BB0C95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wa2s_999y-mm7w"><intent_id>769719</intent_id><project_id>795005</project_id><text_data>They will be assisting in Sealcoating Bike Trail</text_data><comment_date>2016-06-30T00:00:00</comment_date></row><row _id="row-8snf.pn8g-sj6s" _uuid="00000000-0000-0000-9162-CB210B75959F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8snf.pn8g-sj6s"><intent_id>1004716</intent_id><project_id>892254</project_id><text_data>THE DELAY IN FILING THE INTENT IS DUE TO THE JOB FILE BEING FILED INCORRECTLY AND WAS JUST FOUND.</text_data><comment_date>2019-09-04T00:00:00</comment_date></row><row _id="row-v48d~kjtn-gswa" _uuid="00000000-0000-0000-8836-6D4D407DB816" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v48d~kjtn-gswa"><intent_id>1153181</intent_id><project_id>966980</project_id><text_data>9861361</text_data><comment_date>2021-06-16T00:00:00</comment_date></row><row _id="row-jfpz-jn6a.t8ed" _uuid="00000000-0000-0000-2EA7-676739A7DC76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jfpz-jn6a.t8ed"><intent_id>691419</intent_id><project_id>760941</project_id><text_data>Manrique 408 S 25th St 98274We are contracted for all electrical work. All residences are single family dwellings.</text_data><comment_date>2015-04-28T00:00:00</comment_date></row><row _id="row-djag-ftd4~izv4" _uuid="00000000-0000-0000-CEE0-395A92200C0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-djag-ftd4~izv4"><intent_id>626683</intent_id><project_id>733733</project_id><text_data>Higher paid lineperson is the foreman</text_data><comment_date>2014-04-25T00:00:00</comment_date></row><row _id="row-hvkz-4kqu-puap" _uuid="00000000-0000-0000-4B2D-BEC3ED946D68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hvkz-4kqu-puap"><intent_id>944173</intent_id><project_id>850092</project_id><text_data>***SELF-INSURED***GENERAL LABORER: Performs work of shoveling with a hand shovel, cleaning/sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket and hand broom.OTHER TRUCKS: A Low Boy trailer used for delivery and pick up of equipment. A 2018 Kenworth Tack Truck 2,000 Gallon</text_data><comment_date>2018-11-06T00:00:00</comment_date></row><row _id="row-pdfc-a3mg-hvkt" _uuid="00000000-0000-0000-A8EC-AAD8D60FC1FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pdfc-a3mg-hvkt"><intent_id>667647</intent_id><project_id>749689</project_id><text_data>landscape maintenance mowing edging weeding irrigation repairs</text_data><comment_date>2014-11-26T00:00:00</comment_date></row><row _id="row-nd8t_eiqe-bwx5" _uuid="00000000-0000-0000-398F-0FBAE463C3AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nd8t_eiqe-bwx5"><intent_id>1256673</intent_id><project_id>1025819</project_id><text_data>HM WO #11116</text_data><comment_date>2022-08-10T00:00:00</comment_date></row><row _id="row-umxm~u3ym.5k6v" _uuid="00000000-0000-0000-8077-6C2533111FB4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-umxm~u3ym.5k6v"><intent_id>1245761</intent_id><project_id>1020163</project_id><text_data>22-80-149</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-jntp~m8m5-mpng" _uuid="00000000-0000-0000-6935-9E331598CF48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jntp~m8m5-mpng"><intent_id>797888</intent_id><project_id>805259</project_id><text_data>Work included involves planting 1 gallon and 2 gallon plants and installing a deer fence around the area.</text_data><comment_date>2016-10-25T00:00:00</comment_date></row><row _id="row-pqkh~zzyg-s6me" _uuid="00000000-0000-0000-BCE0-BEB5355FCD03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqkh~zzyg-s6me"><intent_id>1318787</intent_id><project_id>1062836</project_id><text_data>sr53798344 invoice 89700686</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-p2hb_gtmu-y9wv" _uuid="00000000-0000-0000-FBCA-12D3A29E9DD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p2hb_gtmu-y9wv"><intent_id>1034817</intent_id><project_id>906334</project_id><text_data>weatherize home  2.  single family  3.  1 or 2  4.  a  no  b.  no  c.  yes  d.  no  e.  no  f.  no  g.  no  h.  no  I.  no  j.  no  k.  yes  6.  yes  7.  no  8.  no</text_data><comment_date>2020-01-30T00:00:00</comment_date></row><row _id="row-adz2~qcbu.4fdy" _uuid="00000000-0000-0000-2A39-87011A81620B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-adz2~qcbu.4fdy"><intent_id>738859</intent_id><project_id>750833</project_id><text_data>INDOOR AUDIO/VISUAL SYSTEM IN THE MEETING ROOM.</text_data><comment_date>2015-12-22T00:00:00</comment_date></row><row _id="row-p7cv-pavk-5dvd" _uuid="00000000-0000-0000-CBB0-77C7F6112479" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7cv-pavk-5dvd"><intent_id>1184180</intent_id><project_id>982877</project_id><text_data>Other Truck is a 3,500 gallon water truck.</text_data><comment_date>2021-10-08T00:00:00</comment_date></row><row _id="row-fngr-3xae~9aks" _uuid="00000000-0000-0000-1883-D8E86B11EFB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fngr-3xae~9aks"><intent_id>616099</intent_id><project_id>728756</project_id><text_data>1114018</text_data><comment_date>2014-02-12T00:00:00</comment_date></row><row _id="row-iyzh_xf4m_cs6a" _uuid="00000000-0000-0000-EC7F-E52B5F807CC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iyzh_xf4m_cs6a"><intent_id>974852</intent_id><project_id>792683</project_id><text_data>22656</text_data><comment_date>2019-04-30T00:00:00</comment_date></row><row _id="row-x97a~y85n_pf4y" _uuid="00000000-0000-0000-46A3-83B3D1137E0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x97a~y85n_pf4y"><intent_id>869664</intent_id><project_id>835340</project_id><text_data>There will be one Owner/Operator working on this project.</text_data><comment_date>2017-10-19T00:00:00</comment_date></row><row _id="row-b7si~ms3e_rad7" _uuid="00000000-0000-0000-7660-F19A91C10367" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b7si~ms3e_rad7"><intent_id>543853</intent_id><project_id>698067</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-11-19T00:00:00</comment_date></row><row _id="row-fyfa_tzi8~d2dm" _uuid="00000000-0000-0000-0E77-698FA266B85B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fyfa_tzi8~d2dm"><intent_id>789517</intent_id><project_id>802539</project_id><text_data>1-Attic insulation-Wall insulation-2-single family dwelling 3-1 story 4-A-NO B-NO C-YES D-NO E-NO F-NO G-NO H-NO I-NO J-NO K-NO 5-yes 6-yes 7-no 8-no</text_data><comment_date>2016-09-15T00:00:00</comment_date></row><row _id="row-pb4u-nkbj~xmpd" _uuid="00000000-0000-0000-1C43-09CFE566C135" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pb4u-nkbj~xmpd"><intent_id>949464</intent_id><project_id>868105</project_id><text_data>Filed by Terry Gage</text_data><comment_date>2018-12-06T00:00:00</comment_date></row><row _id="row-ekhf.2k4y_vd7j" _uuid="00000000-0000-0000-7ECC-4162711C558B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ekhf.2k4y_vd7j"><intent_id>953334</intent_id><project_id>854361</project_id><text_data>Filed by Seanna TrentmanProject is exempt from State Prevailing Wage Rates based on the Housing Act of 1937 &amp; 24 CFR 965.101. All workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades/occupations</text_data><comment_date>2019-01-04T00:00:00</comment_date></row><row _id="row-i2zw_nnyp-3uzg" _uuid="00000000-0000-0000-4843-31F27AFFE749" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2zw_nnyp-3uzg"><intent_id>887678</intent_id><project_id>843411</project_id><text_data>THIS IS A BUNDLE OF 20 LOW INCOME WEATHERIZATION JOBS. THEY ARE ALL SINGLE FAMILY, RESIDENTIAL DWELLINGS.1. 1005 SE 128TH AVE, VANCOUVER2. 4013 NE THURSTON WAY, VANCOUVER3. 2507 E 26TH ST, VANCOUVER4. 12607 NE 86TH ST, VANCOUVER5. 17401 SE 39TH ST #45, VANCOUVER6. 15902 NE 76TH WAY, VANCOUVER7. 13911 SE 14TH ST, VANCOUVER8. 15403 SE 1ST ST, VANCOUVER9. 3203 O ST, VANCOUVER10. 26200 NE CC LANDON RD, YACOLT11. 4501 ADDY ST #123, WASHOUGAL12. 14705 NE ORION ST, VANCOUVER13. 9700 NE 67TH ST, VANCOUVER14. 40004 NE HOFF AVE, AMBOY15. 1824 NE BROWN RD, WASHOUGAL16. 5404 NE 121ST AVE #95, VANCOUVER17. 8512 NE 30TH AVE, VANCOUVER18. 7504 NE 120TH AVE, VANCOUVER19. 300 SW 7TH AVE #1001, BATTLEGROUND20. 2104 SE 132ND CT, VANCOUVER</text_data><comment_date>2018-02-09T00:00:00</comment_date></row><row _id="row-55ex_3pqa~9q6r" _uuid="00000000-0000-0000-3FFE-50B1199B327F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-55ex_3pqa~9q6r"><intent_id>757891</intent_id><project_id>790139</project_id><text_data>INSTALLATION OF 4 PAIR COMMUNICATIONS CABLING INTERIOR OF THE BUILDING FOR PC CONNECTIVITY.  PROJECT#508120</text_data><comment_date>2016-04-21T00:00:00</comment_date></row><row _id="row-87zd.xydh_dp69" _uuid="00000000-0000-0000-556F-C901BB2CAEB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87zd.xydh_dp69"><intent_id>1232625</intent_id><project_id>1004583</project_id><text_data>Job #222018</text_data><comment_date>2022-05-11T00:00:00</comment_date></row><row _id="row-8x79.tcba~tcad" _uuid="00000000-0000-0000-BB5D-7B8F26B83A8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8x79.tcba~tcad"><intent_id>962938</intent_id><project_id>873148</project_id><text_data>Job: Christensen</text_data><comment_date>2019-03-01T00:00:00</comment_date></row><row _id="row-nkqk.vpi3_qf82" _uuid="00000000-0000-0000-E807-2F7486560D03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nkqk.vpi3_qf82"><intent_id>1465674</intent_id><project_id>1144609</project_id><text_data>Work performed by the Telecommunication Technicians is installing/repairing fiber optic telecommunications cabling for voice (telephone) and/or data (computer networking) indoors. POWERCOM JOB #960144</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-ac6n-fshz~ir2r" _uuid="00000000-0000-0000-579B-5AAA8357D2FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ac6n-fshz~ir2r"><intent_id>1240835</intent_id><project_id>1017384</project_id><text_data>Please note this information is intended for projected/estimated repairs/service/installs of kitchen equipment service prior to dispatching technicians and is based on the customer�s request for service. Submitted for the purpose of obtaining the L&amp;I �Intent� and compliance. Upon completion of the service request, we will file the �Avadavat� confirming actual services preformed, labor hours and notation of any additional tools used outside of the general tools listed below.    General tools used by our technicians for plumbing/pipefitters equipment service: Pipe wrench, channel locks, thread tape, silicone gun, Phillips�s screwdriver, flathead screwdriver, putty knife, ball pin hammer.   General tools used by our technicians for electrical component equipment service: Multi-Meter, insulated screwdriver, wire nuts, safety locks for lockout/tagout, insulated Allen wrenches.   General Installation tools used by our technicians: cordless drill, multi screwdriver, ball pin hammer, small floor jack, silicone gun, floor dollies, channel locks, Sawzall, pry bar   All technicians use company supplied vehicles to arrive at job site</text_data><comment_date>2022-06-13T00:00:00</comment_date></row><row _id="row-29nc_huzw.gv3d" _uuid="00000000-0000-0000-3CB7-2C93C68B6EEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-29nc_huzw.gv3d"><intent_id>1085903</intent_id><project_id>931681</project_id><text_data>1119608 - 1602021006</text_data><comment_date>2020-09-03T00:00:00</comment_date></row><row _id="row-mi7a~8pbk.ybxh" _uuid="00000000-0000-0000-B0AA-827C61D7709E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mi7a~8pbk.ybxh"><intent_id>794611</intent_id><project_id>803568</project_id><text_data>Job #14713</text_data><comment_date>2016-10-07T00:00:00</comment_date></row><row _id="row-6xia~8wje~33ps" _uuid="00000000-0000-0000-7B00-7B45AFD1BDD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xia~8wje~33ps"><intent_id>795371</intent_id><project_id>804727</project_id><text_data>Approval of this form does not signify approval of the classifications of labor listed on the form. The basis for approval is the criteria that the prevailing rate of wage/benefits listed equals or exceeds the amount published for the classification of labor listed.</text_data><comment_date>2017-08-08T00:00:00</comment_date></row><row _id="row-jzgi-t7xa-zqz3" _uuid="00000000-0000-0000-BA91-4671B437FF14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzgi-t7xa-zqz3"><intent_id>523010</intent_id><project_id>691854</project_id><text_data>KVA Electric is Exempt from Electrical Licensing per RCW 19.28.091 and WAC 46B-925.17.Previously confirmed by Shannon in Electrical Licensing Dept and Dennis in Contractors Registration.</text_data><comment_date>2012-07-18T00:00:00</comment_date></row><row _id="row-byq6_qw4c_yiqd" _uuid="00000000-0000-0000-2497-55889449C522" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-byq6_qw4c_yiqd"><intent_id>1367957</intent_id><project_id>1066586</project_id><text_data>sv57084</text_data><comment_date>2023-09-28T00:00:00</comment_date></row><row _id="row-ebdx~5w6m~gaqw" _uuid="00000000-0000-0000-AF53-7669A9537D07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebdx~5w6m~gaqw"><intent_id>1266506</intent_id><project_id>1030983</project_id><text_data>Job #41230-1</text_data><comment_date>2022-09-14T00:00:00</comment_date></row><row _id="row-zana~j2u6.qmpi" _uuid="00000000-0000-0000-22AE-4B0E9BCD4F3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zana~j2u6.qmpi"><intent_id>1233101</intent_id><project_id>1012980</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Rodent control and cleanout services#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have? 2#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No(b) Any retail use in the structure? No(c) Permanent residence only? Yes(d) Rehabilitation house? No(e) Transitional housing? No(f) Communal dining facility? No(g) Treatment services? No(h) Assisted living services? No(I) Dormitories? No(j) Counseling? No(k) Is each room and/or bed in the structure rented separately? No(l) Other? No#5 - Does each dwelling unit have its own self-contained kitchen? No#6 - Does each dwelling unit have its own bathroom? No#7 - Is there a community facility or manager�s office on site? No#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2022-05-12T00:00:00</comment_date></row><row _id="row-y979_uvg2-3pni" _uuid="00000000-0000-0000-8155-C140890F7659" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y979_uvg2-3pni"><intent_id>718473</intent_id><project_id>735566</project_id><text_data>Truck Drivers - Other Trucks - Semi Truck , used to transport crane counterweight.</text_data><comment_date>2015-09-02T00:00:00</comment_date></row><row _id="row-7dcv_hzmj-6dsm" _uuid="00000000-0000-0000-3D9F-CE5439E14C96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7dcv_hzmj-6dsm"><intent_id>676926</intent_id><project_id>743729</project_id><text_data>WE ARE AN IDAHO BASED COMPANY.</text_data><comment_date>2015-01-30T00:00:00</comment_date></row><row _id="row-22fs-dx3e.d8sv" _uuid="00000000-0000-0000-7723-95C0D4228117" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22fs-dx3e.d8sv"><intent_id>1046518</intent_id><project_id>912932</project_id><text_data>We are a subcontractor for FieldTurf. They have been hired to improve the athletic surfaces at Einstein Middle School. We are patching and resurfacing the existing track surface putting down a rubber and epoxy mix to fill holes and create a nice even surface. Once we make sure the track surface is safe, we will spray paint lines on the track for lanes and track events.</text_data><comment_date>2020-03-19T00:00:00</comment_date></row><row _id="row-j8nk-6ta7-p2cg" _uuid="00000000-0000-0000-7CAB-BBF69AFFCFF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j8nk-6ta7-p2cg"><intent_id>570230</intent_id><project_id>616446</project_id><text_data>Filed by: Kenneth Swanson</text_data><comment_date>2013-05-17T00:00:00</comment_date></row><row _id="row-3yn4~hca5~encs" _uuid="00000000-0000-0000-9AAC-8C3AB68BEE64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3yn4~hca5~encs"><intent_id>1056374</intent_id><project_id>906133</project_id><text_data>This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2020-05-07T00:00:00</comment_date></row><row _id="row-q6kt-p2r3.3vc8" _uuid="00000000-0000-0000-068A-2FC673ADC03E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q6kt-p2r3.3vc8"><intent_id>1208360</intent_id><project_id>997626</project_id><text_data>12063 2022 agreement</text_data><comment_date>2022-02-01T00:00:00</comment_date></row><row _id="row-w2x3-z5vs_m2uj" _uuid="00000000-0000-0000-1D05-3E366919A777" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w2x3-z5vs_m2uj"><intent_id>1121990</intent_id><project_id>950372</project_id><text_data>Blythe job # Y-904</text_data><comment_date>2021-02-12T00:00:00</comment_date></row><row _id="row-bxnj~mt8c-npvb" _uuid="00000000-0000-0000-0DBE-F824B88B9C9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bxnj~mt8c-npvb"><intent_id>1116743</intent_id><project_id>947441</project_id><text_data>Service repair on heat pump for homeowner in single family manufactured home, - 4a) NO 4b) NO 4c) YES 4d) NO 4e) NO 4f) NO 4g) NO 4h) NO 4i) NO 4j) NO 4k) NO 5) NO 6) NO 7) NO</text_data><comment_date>2021-01-21T00:00:00</comment_date></row><row _id="row-kctn.bi3x.dj45" _uuid="00000000-0000-0000-539B-44104BC91233" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kctn.bi3x.dj45"><intent_id>951587</intent_id><project_id>869076</project_id><text_data>Updated to Commercial Rates based on L&amp;I request.</text_data><comment_date>2019-01-02T00:00:00</comment_date></row><row _id="row-s9fd-u3f7_j473" _uuid="00000000-0000-0000-DDE2-B398945DEBA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s9fd-u3f7_j473"><intent_id>1265507</intent_id><project_id>1018245</project_id><text_data>tilt deck carrier single unit to transport 8 x 20 Conex boxes</text_data><comment_date>2022-09-29T00:00:00</comment_date></row><row _id="row-mbgb.bh7c_p6v8" _uuid="00000000-0000-0000-8110-9CD4E259F87B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbgb.bh7c_p6v8"><intent_id>946771</intent_id><project_id>866926</project_id><text_data>General laborer: hand shovel</text_data><comment_date>2018-11-20T00:00:00</comment_date></row><row _id="row-r5cw.tc9c-5yiz" _uuid="00000000-0000-0000-2AAB-F058F9C60F2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5cw.tc9c-5yiz"><intent_id>651349</intent_id><project_id>741377</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2014-08-28T00:00:00</comment_date></row><row _id="row-jwgt-eeh6_ktz9" _uuid="00000000-0000-0000-D54F-ABB40C8A4E47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jwgt-eeh6_ktz9"><intent_id>1069111</intent_id><project_id>924071</project_id><text_data>Gutter Cleaning  Apartment Complex  3 stories A. No: B. No: C.Yes: D No: E No: F No: G No: H No: I No: J No: K No: I NA  YesYesYesNo</text_data><comment_date>2020-06-30T00:00:00</comment_date></row><row _id="row-7gfj_kkat-brkc" _uuid="00000000-0000-0000-10F0-4B10ACB781D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7gfj_kkat-brkc"><intent_id>987623</intent_id><project_id>848482</project_id><text_data>Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2019-07-09T00:00:00</comment_date></row><row _id="row-xfxk_dih2-4aww" _uuid="00000000-0000-0000-6282-4BB71379EC6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xfxk_dih2-4aww"><intent_id>670612</intent_id><project_id>721048</project_id><text_data>I do not intend to use employees but in case I do I have selected to use employees and will enter zero on the affidavit if I do not use any.</text_data><comment_date>2014-12-18T00:00:00</comment_date></row><row _id="row-eyr6~tbbz~5dxr" _uuid="00000000-0000-0000-29E1-6EB80AF1BCA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eyr6~tbbz~5dxr"><intent_id>609914</intent_id><project_id>726321</project_id><text_data>FIled by Jay R. Lind.</text_data><comment_date>2013-12-27T00:00:00</comment_date></row><row _id="row-zbht.bi26_gw33" _uuid="00000000-0000-0000-15FB-C8E03ED91849" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zbht.bi26_gw33"><intent_id>1034028</intent_id><project_id>905872</project_id><text_data>SEE PROJECT DESCRIPTION</text_data><comment_date>2020-01-27T00:00:00</comment_date></row><row _id="row-vtnx.82kj.sa8x" _uuid="00000000-0000-0000-8EBE-D43E4B3A9671" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vtnx.82kj.sa8x"><intent_id>1419013</intent_id><project_id>1120076</project_id><text_data>9938983</text_data><comment_date>2024-04-13T00:00:00</comment_date></row><row _id="row-ysgp_xw28.qcne" _uuid="00000000-0000-0000-7B8C-3CD031C1578E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ysgp_xw28.qcne"><intent_id>652344</intent_id><project_id>743530</project_id><text_data>#1 - Describe the work that your firm was contracted to perform? Weatherization #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single Family #3 - Including any basement or garage, how many stories or levels does the structure have? 1  #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No (b) Any retail use in the structure? No (c) Permanent residence only? Yes (d) Rehabilitation house? No (e) Transitional housing? No (f) Communal dining facility? No (g) Treatment services? No (h) Dormitories? No (i) Counseling? No (j) Is each room and/or bed in the structure rented separately? No (k) Other? No #5 - Does each dwelling unit have its own self-contained kitchen? Yes #6 - Does each dwelling unit have its own bathroom? Yes #7 - Is there a community facility or manager�s office on site? No #8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2014-09-04T00:00:00</comment_date></row><row _id="row-f86d.trkh~jbv5" _uuid="00000000-0000-0000-2F9B-075994E93959" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f86d.trkh~jbv5"><intent_id>786218</intent_id><project_id>777750</project_id><text_data>Job 1160047 Lynndale ES, GK KnutsonOriginal Intent ID 757905 filed 4/21/16, new Intent created per GC&amp;#39;s Request</text_data><comment_date>2016-08-30T00:00:00</comment_date></row><row _id="row-6u2c.kuty~ema8" _uuid="00000000-0000-0000-AAD6-361A603EA886" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6u2c.kuty~ema8"><intent_id>891608</intent_id><project_id>845280</project_id><text_data>track and surface install</text_data><comment_date>2018-03-07T00:00:00</comment_date></row><row _id="row-hnm4-72u3~5ah5" _uuid="00000000-0000-0000-9EB0-547BF181782C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hnm4-72u3~5ah5"><intent_id>517282</intent_id><project_id>686926</project_id><text_data>2205 butterfield rd #255yakima,wa 98901</text_data><comment_date>2012-06-18T00:00:00</comment_date></row><row _id="row-3art_ba4w_iskm" _uuid="00000000-0000-0000-BB94-E278E15B94B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3art_ba4w_iskm"><intent_id>660384</intent_id><project_id>746289</project_id><text_data>Intent is being re-used.</text_data><comment_date>2015-05-14T00:00:00</comment_date></row><row _id="row-zkg3_7526_c6xd" _uuid="00000000-0000-0000-95C0-1D0F104ED03F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zkg3_7526_c6xd"><intent_id>1285272</intent_id><project_id>1041928</project_id><text_data>Job #220478NCAC- Alvarado #1 - Describe the work that your firm was contracted to perform. - HVAC HEAT PUMP INSTALLATION#2 - Is the structure a single-family dwelling, duplex, apartment, condominium, or other residential structure? RESIDENTIAL SINGLE FAMILY#3 - Including any basement or garage, how many stories or levels does the structure have? SINGLE STORY#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only?  YES(d) Rehabilitation house? NO(e) Transitional housing?  NO(f) Communal dining facility? NO (g) Treatment services? NO (h) Assisted living services? NO(I) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO(l) Other? N/A#5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on-site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2022-11-21T00:00:00</comment_date></row><row _id="row-9ngm.chnq~8giz" _uuid="00000000-0000-0000-C5DD-983AADCECEF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ngm.chnq~8giz"><intent_id>1214840</intent_id><project_id>1001616</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 6 for voice (telephone) and data (computer networking) indoors. POWERCOM JOB #926419</text_data><comment_date>2022-03-02T00:00:00</comment_date></row><row _id="row-f5js~c4sp.d7yd" _uuid="00000000-0000-0000-639C-FBE7E39076F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f5js~c4sp.d7yd"><intent_id>682347</intent_id><project_id>755217</project_id><text_data>Chacksfield2725 E Fir St Unit 25Mt Vernon, WA 982731) Repair leaks, drain &amp; water. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f)No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) Yes - manager office. 8) No.Kelly700 N Reed St #91Sedro-Woolley, WA 982841) Replace water heater. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f)No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) Yes - manager office. 8) No.</text_data><comment_date>2015-03-06T00:00:00</comment_date></row><row _id="row-cxjw.jgue-pshg" _uuid="00000000-0000-0000-D6EB-7064F0CD74A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxjw.jgue-pshg"><intent_id>731574</intent_id><project_id>776815</project_id><text_data>Will update communication system by upgrading antenna at Battelle site, upgrade antenna at West Sequim Bay site and upgrade antenna at Junco site.</text_data><comment_date>2015-11-13T00:00:00</comment_date></row><row _id="row-fjh8~6nxp-5npv" _uuid="00000000-0000-0000-A595-42F025876C5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fjh8~6nxp-5npv"><intent_id>912860</intent_id><project_id>850572</project_id><text_data>Filed by John James</text_data><comment_date>2018-06-21T00:00:00</comment_date></row><row _id="row-newg_qs8s_kjvd" _uuid="00000000-0000-0000-0188-75791C16D890" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-newg_qs8s_kjvd"><intent_id>468155</intent_id><project_id>497228</project_id><text_data>Usual Benefits breakdown:hourly pension = 1.54medical = 4.03vacation = .97holiday = .65</text_data><comment_date>2011-08-09T00:00:00</comment_date></row><row _id="row-prcs-bmax.2bj3" _uuid="00000000-0000-0000-55A1-734D4BE8FA75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prcs-bmax.2bj3"><intent_id>851204</intent_id><project_id>798861</project_id><text_data>Brick Paver = BricklayerBrick Mason = Labor (Mason Tender - Brick)</text_data><comment_date>2017-07-31T00:00:00</comment_date></row><row _id="row-vtha_2iqb-7sd5" _uuid="00000000-0000-0000-AAF8-21BA44C422FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vtha_2iqb-7sd5"><intent_id>448660</intent_id><project_id>649201</project_id><text_data>Industrial Insurance Account Id: 502,803-00</text_data><comment_date>2011-04-06T00:00:00</comment_date></row><row _id="row-spi4-482x_j8en" _uuid="00000000-0000-0000-49A1-6DA765ECE543" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-spi4-482x_j8en"><intent_id>711397</intent_id><project_id>767675</project_id><text_data>1 sewer cleared 2 yes 3 1 4a no b no c yes d no e no f no g no h no i no j no k no 5 yes 6 yes 7 no 8 no</text_data><comment_date>2015-07-31T00:00:00</comment_date></row><row _id="row-x9q8.9m5r-e389" _uuid="00000000-0000-0000-1F1B-4316474EED14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x9q8.9m5r-e389"><intent_id>756667</intent_id><project_id>788982</project_id><text_data>Locate and remove irrigation. Remove sod, soil and top dressing. Replace w/ new sod,soil, weed barrier and bark. Plant new plants and trees. Relocate sprinkler heads. clean area</text_data><comment_date>2016-04-14T00:00:00</comment_date></row><row _id="row-ajes-57u2~szru" _uuid="00000000-0000-0000-B8A2-713511359DF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ajes-57u2~szru"><intent_id>1184292</intent_id><project_id>967807</project_id><text_data>dump truck and trailer</text_data><comment_date>2021-10-08T00:00:00</comment_date></row><row _id="row-6e7u_h7fb~e5rk" _uuid="00000000-0000-0000-8627-F14645907938" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6e7u_h7fb~e5rk"><intent_id>674968</intent_id><project_id>751584</project_id><text_data>owner will do the work</text_data><comment_date>2015-01-15T00:00:00</comment_date></row><row _id="row-qrtb.bhwe~pb9u" _uuid="00000000-0000-0000-E1FD-0DA98F324BBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qrtb.bhwe~pb9u"><intent_id>533224</intent_id><project_id>689965</project_id><text_data>Project is exempt from state prevsiling wage requirements based on the housing act of 1937 and 24 CFR965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades or occupations, (Electronic Technicians).</text_data><comment_date>2012-09-07T00:00:00</comment_date></row><row _id="row-5hux-ccq2_q9rr" _uuid="00000000-0000-0000-009F-17914F4B06AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5hux-ccq2_q9rr"><intent_id>1286040</intent_id><project_id>1041301</project_id><text_data>Type of system worked upon is Backbone Fiber infrastructure. We work both indoors &amp; outdoors. We are installing (2) new cables out of one building to 2 other buildings through an existing manhole system. We are installing (2) 12ct single-mode fiber cables from and IT building to the staff resources building and IIU building.</text_data><comment_date>2022-11-28T00:00:00</comment_date></row><row _id="row-9iac_ecnv.hguj" _uuid="00000000-0000-0000-1A4A-74A54D9FCEFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9iac_ecnv.hguj"><intent_id>1203126</intent_id><project_id>986445</project_id><text_data>General Laborer consists of hand work only (no power tools or equipment) $35.23 base + $8.81 pensionCrane Oiler/Driver is an Oil Distributor. Wage band approach is being utilized per Harvey Means $39.97 base + $9.99 pensionOther trucks consists of a 0 to 8,000 gallon water truck used to help with compaction and dust control $40.55 base + $10.14 pension</text_data><comment_date>2022-01-06T00:00:00</comment_date></row><row _id="row-8p42~m8m9.qt52" _uuid="00000000-0000-0000-ABB3-279C2D9BC064" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8p42~m8m9.qt52"><intent_id>1245889</intent_id><project_id>1020248</project_id><text_data>PO# 829819</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-muvg.er72~kux2" _uuid="00000000-0000-0000-DE43-AC3853E2A688" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-muvg.er72~kux2"><intent_id>742116</intent_id><project_id>770497</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install distribution cable for voice / data communications.  Install copper cables for communications backbone between equipment rooms.  Terminate cables in the equipment room and terminate the cables routed between Comm. equipment rooms.</text_data><comment_date>2016-01-18T00:00:00</comment_date></row><row _id="row-gtf2~xvnd_axtn" _uuid="00000000-0000-0000-B23E-6DBFA122810F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gtf2~xvnd_axtn"><intent_id>1269641</intent_id><project_id>1028517</project_id><text_data>Owner/operator will be the one working and he's salary.</text_data><comment_date>2022-09-26T00:00:00</comment_date></row><row _id="row-mc4y-y9pb.st8b" _uuid="00000000-0000-0000-F88C-38E51E95568D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mc4y-y9pb.st8b"><intent_id>1242352</intent_id><project_id>998438</project_id><text_data>Development of a paved 'overflow' parking lot and the addition of a Children's Celebration Garden Playground within the Felida Park. Irrigation and Landscape as long as Relocation and adjustment of existing irrigation system.</text_data><comment_date>2022-06-17T00:00:00</comment_date></row><row _id="row-c85t_5j4z~8u6c" _uuid="00000000-0000-0000-9995-7476A8F58EFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c85t_5j4z~8u6c"><intent_id>1080409</intent_id><project_id>903740</project_id><text_data>Truck Is a 3,000 gallon truck mounted hydroseeder</text_data><comment_date>2020-08-14T00:00:00</comment_date></row><row _id="row-yqqw~zg77_zehr" _uuid="00000000-0000-0000-76A6-9B3BD0323D27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yqqw~zg77_zehr"><intent_id>789746</intent_id><project_id>802631</project_id><text_data>Filed by Kristin Pourden.</text_data><comment_date>2016-09-15T00:00:00</comment_date></row><row _id="row-5buz-gfyz.7b96" _uuid="00000000-0000-0000-8755-A023F0AA1690" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5buz-gfyz.7b96"><intent_id>1150049</intent_id><project_id>965315</project_id><text_data>Motor Pat Grader to vacuum Trench lineHaz Waste worker to remove all debris using rake/shovel</text_data><comment_date>2021-06-06T00:00:00</comment_date></row><row _id="row-9xz5~q2tx~7r62" _uuid="00000000-0000-0000-9C08-8F3DC6A03CF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9xz5~q2tx~7r62"><intent_id>712629</intent_id><project_id>769273</project_id><text_data>Job Order Contract RTA/CN 0008-13, Contract Purchase Order No. 141074 OBWork Order No. 053 - 151414 ODSound Transit</text_data><comment_date>2015-08-06T00:00:00</comment_date></row><row _id="row-9g2r~m6cs.zand" _uuid="00000000-0000-0000-28FA-22945FB20D41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9g2r~m6cs.zand"><intent_id>861930</intent_id><project_id>831153</project_id><text_data>Job # 16316</text_data><comment_date>2017-09-11T00:00:00</comment_date></row><row _id="row-k6d2-jy92.g9v2" _uuid="00000000-0000-0000-F08E-C1956265E861" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k6d2-jy92.g9v2"><intent_id>980003</intent_id><project_id>873871</project_id><text_data>Active job number 19-001TRUCKS-lowboy delivers rotomill to job site, sweeper driven to job site</text_data><comment_date>2019-05-23T00:00:00</comment_date></row><row _id="row-vvuk.pyp8.9pp9" _uuid="00000000-0000-0000-7AB6-8D3FCC0E3D3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vvuk.pyp8.9pp9"><intent_id>1010972</intent_id><project_id>894781</project_id><text_data>We have shops in Franklin and Clark counties, which are both listed on the Intent. You've already had me send this back before knowing this.</text_data><comment_date>2019-10-25T00:00:00</comment_date></row><row _id="row-3q53-t654.5dfr" _uuid="00000000-0000-0000-75BF-D7BDBD2D9B20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3q53-t654.5dfr"><intent_id>500348</intent_id><project_id>678615</project_id><text_data>Filed by: Linda NguyenFor: SW Recycling/Tranfer Station - 61st Pl WS District Court - 68th Ave WSouth Precinct - Mill Creek Blvd</text_data><comment_date>2012-02-14T00:00:00</comment_date></row><row _id="row-vi9n~erb7_6e8z" _uuid="00000000-0000-0000-07B1-A6BCC103F7A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vi9n~erb7_6e8z"><intent_id>576824</intent_id><project_id>705752</project_id><text_data>ANY EMPLOYEES ON THE JOB WILL BE OREGON EMPLOYEES, WORKING TEMPORARILY IN WASHINGTON AND COVERED BY OREGON WORKERS' COMPENSATION INSURANCE AND UNEMPLOYMENT.</text_data><comment_date>2013-06-21T00:00:00</comment_date></row><row _id="row-7cmh.da24-hv4k" _uuid="00000000-0000-0000-3A85-6F87B4EB1BAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7cmh.da24-hv4k"><intent_id>891432</intent_id><project_id>845194</project_id><text_data>1 - No heat2 - Single Family Home3 - 24 -a - nob - noc - nod - noe - nof - nog - noh - noi - noj - nok - no l - no5 - NA6 - NA7 - NA8 - NA</text_data><comment_date>2018-03-06T00:00:00</comment_date></row><row _id="row-jbbz.tgwx~cp2r" _uuid="00000000-0000-0000-A386-7E2EFDF91A76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jbbz.tgwx~cp2r"><intent_id>731272</intent_id><project_id>776678</project_id><text_data>1)We were contracted to repair the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2015-11-12T00:00:00</comment_date></row><row _id="row-49m6~hcpu_xw36" _uuid="00000000-0000-0000-1A6D-87970DAFFA04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49m6~hcpu_xw36"><intent_id>616712</intent_id><project_id>716930</project_id><text_data>FIled by Joseph Crapi.Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2014-02-18T00:00:00</comment_date></row><row _id="row-8a3c-tffm_z56s" _uuid="00000000-0000-0000-9905-0CEADDD27EEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8a3c-tffm_z56s"><intent_id>790075</intent_id><project_id>802755</project_id><text_data>This is a landscape maintenance clean up at Paine Field Boulevard, in the city of Mukilteo, Snohomish county.  This site will have two seperate clean up dates.  Work includes, removal of weeds, debris, blackberry, pruning and mowing of taller grass areas.  All debris will be hauled off site.  Tools include, hand pruners, rakes, shovels, wheelbarrows, walk behind mowers, and hedgetrimmers under 90hph.  Backpack blowers will be used to clean up.</text_data><comment_date>2016-09-19T00:00:00</comment_date></row><row _id="row-2h4w.j8wu.zv3h" _uuid="00000000-0000-0000-7986-CF9C477D13E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2h4w.j8wu.zv3h"><intent_id>992557</intent_id><project_id>883904</project_id><text_data>WRS Job #P19-222PW</text_data><comment_date>2019-07-17T00:00:00</comment_date></row><row _id="row-cmyq-zjuc~gxwe" _uuid="00000000-0000-0000-35B3-682AE433858B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cmyq-zjuc~gxwe"><intent_id>791981</intent_id><project_id>791245</project_id><text_data>Filed by Benjamin A Shrope</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-dqqk-hr3w~q89h" _uuid="00000000-0000-0000-DA7F-413A6D6018A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dqqk-hr3w~q89h"><intent_id>933739</intent_id><project_id>861770</project_id><text_data>Lincoln St #439, Bellingham, Wa 982291. Air seal, attic blow, duct seal, belly blow, mechanical ventilation		2. Single family		3. 1		4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No		5. Yes		6. Yes		7. No		8. No</text_data><comment_date>2018-09-18T00:00:00</comment_date></row><row _id="row-s7nk_xmgp~cmcy" _uuid="00000000-0000-0000-709C-850A86241B1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s7nk_xmgp~cmcy"><intent_id>961760</intent_id><project_id>873945</project_id><text_data>General Laborer: hand shovel OTher Truck: Lowboy</text_data><comment_date>2019-02-22T00:00:00</comment_date></row><row _id="row-9j8w~t5r9~n3tt" _uuid="00000000-0000-0000-391F-CA566EAC0EBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9j8w~t5r9~n3tt"><intent_id>1034473</intent_id><project_id>854790</project_id><comment_date>2020-01-29T00:00:00</comment_date></row><row _id="row-kn9c-gf5g_dj6x" _uuid="00000000-0000-0000-C47D-488856C0839C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kn9c-gf5g_dj6x"><intent_id>673179</intent_id><project_id>752369</project_id><text_data>PC6</text_data><comment_date>2015-01-12T00:00:00</comment_date></row><row _id="row-8d3f.8crz_rf9w" _uuid="00000000-0000-0000-A414-51CB658B22CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8d3f.8crz_rf9w"><intent_id>548615</intent_id><project_id>700916</project_id><text_data>Install Sod and Design Build Irrigation System.  Will use equipment less than 90 HP and hand tools</text_data><comment_date>2012-12-14T00:00:00</comment_date></row><row _id="row-nz82.gs6u-eeid" _uuid="00000000-0000-0000-A9DF-A73E832DB274" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nz82.gs6u-eeid"><intent_id>969262</intent_id><project_id>877433</project_id><text_data>0619008</text_data><comment_date>2019-04-03T00:00:00</comment_date></row><row _id="row-bb5b_dej6~qmyu" _uuid="00000000-0000-0000-E2CB-8F4AA482E120" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bb5b_dej6~qmyu"><intent_id>517931</intent_id><project_id>690044</project_id><text_data>HIF#13517409</text_data><comment_date>2012-06-20T00:00:00</comment_date></row><row _id="row-dfmh~z7na~ttke" _uuid="00000000-0000-0000-4DC7-3C6DCDD8E76F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfmh~z7na~ttke"><intent_id>1225134</intent_id><project_id>956929</project_id><text_data>Fringehealth 6.5pension 4.54scope of our work includes soil preparation and planting</text_data><comment_date>2022-04-13T00:00:00</comment_date></row><row _id="row-pmge~j666_endx" _uuid="00000000-0000-0000-54C4-7800CC69C6A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pmge~j666_endx"><intent_id>1242687</intent_id><project_id>1018441</project_id><text_data>Termination of existing telephone wiring in office. All work done within the existing building.</text_data><comment_date>2022-06-20T00:00:00</comment_date></row><row _id="row-5pqp_9cgd~6sse" _uuid="00000000-0000-0000-3497-15D430CC9825" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5pqp_9cgd~6sse"><intent_id>625926</intent_id><project_id>733403</project_id><text_data>The other truck is a KW Tractor w/lowboy hauling equipment and materials to the jobsite.</text_data><comment_date>2014-04-22T00:00:00</comment_date></row><row _id="row-4yrh~55py_893c" _uuid="00000000-0000-0000-8B3D-05CCA6F15590" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4yrh~55py_893c"><intent_id>1118677</intent_id><project_id>948491</project_id><text_data>This move consisted of transportation of contents from one school building in Federal Way to a newly constructed elementary school. Basic hand tools were used for some disassembly of furniture as needed. Carts and dollies were used to move contents on/off box truck. Box truck and passenger van used to transfer workers between locations.</text_data><comment_date>2021-02-25T00:00:00</comment_date></row><row _id="row-kvwx.pfv4~v9vp" _uuid="00000000-0000-0000-4CD6-C935B2C39605" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvwx.pfv4~v9vp"><intent_id>666095</intent_id><project_id>747822</project_id><text_data>084104</text_data><comment_date>2014-11-18T00:00:00</comment_date></row><row _id="row-vnqw-bctj~t993" _uuid="00000000-0000-0000-1445-4438A9D87F59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vnqw-bctj~t993"><intent_id>623635</intent_id><project_id>730867</project_id><text_data>Form filed by: Mike Spencer</text_data><comment_date>2014-04-07T00:00:00</comment_date></row><row _id="row-wg6j.v2fm.qsft" _uuid="00000000-0000-0000-A28D-151A089C315E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wg6j.v2fm.qsft"><intent_id>1280965</intent_id><project_id>998785</project_id><text_data>Installation of low voltage cat6 and cat6A cabling for telephone and data indoors</text_data><comment_date>2022-11-03T00:00:00</comment_date></row><row _id="row-nf86.amy8_krj6" _uuid="00000000-0000-0000-2DDA-2E8D63375F4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nf86.amy8_krj6"><intent_id>785001</intent_id><project_id>793939</project_id><text_data>spreading compost, wood chip mulch and hand seeding</text_data><comment_date>2016-08-25T00:00:00</comment_date></row><row _id="row-k7d3~84b3_vrh7" _uuid="00000000-0000-0000-5D6C-784E46BC738D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7d3~84b3_vrh7"><intent_id>782558</intent_id><project_id>768070</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK &amp;quot;POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)&amp;quot; USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2016-08-16T00:00:00</comment_date></row><row _id="row-8ztz~js9d-esf9" _uuid="00000000-0000-0000-9761-86F80F9D0A02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ztz~js9d-esf9"><intent_id>981891</intent_id><project_id>882909</project_id><text_data>09-19-037L</text_data><comment_date>2019-06-03T00:00:00</comment_date></row><row _id="row-ff28_i8ez~j3fx" _uuid="00000000-0000-0000-B989-D0BEFE7D7B11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ff28_i8ez~j3fx"><intent_id>478038</intent_id><project_id>645507</project_id><text_data>LEI#241511  This project does utilize American Recovery and Reinvestment Act (ARRA) funds.  This project more specifically, also utilizes wetherization/energy efficiency upgrade funds.</text_data><comment_date>2011-09-14T00:00:00</comment_date></row><row _id="row-6qm3-hc99~itmq" _uuid="00000000-0000-0000-97CF-5F91FF0F14F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6qm3-hc99~itmq"><intent_id>1243513</intent_id><project_id>972321</project_id><text_data>The material being spread is not concrete, Shotcrete or Gunite. The material is not under high pressure, it is not a water blaster or a vacuum blaster and we are not performing any green cutting with high pressure water &amp; high pressure air.Our duties for a project are to bring playground wood chip material in our truck to a facility where everything is marked and ready for Swanson employee(s) to take a hose and blow the playground chips on existing playgrounds where they tell us. Once the playground chips are spread out on the playground surface we use a blower similar to a leaf blower to clean up the area around the playground surface.</text_data><comment_date>2022-06-22T00:00:00</comment_date></row><row _id="row-a84b~5gj6~dun6" _uuid="00000000-0000-0000-C2C9-14FC023AF134" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a84b~5gj6~dun6"><intent_id>475014</intent_id><project_id>673283</project_id><text_data>ythe scope of work for this project is to bring outside plant fiber for voice to a new building.</text_data><comment_date>2011-08-29T00:00:00</comment_date></row><row _id="row-yaby-yhfi~ykyk" _uuid="00000000-0000-0000-34C1-2D349DCA79D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yaby-yhfi~ykyk"><intent_id>760673</intent_id><project_id>791366</project_id><text_data>Contract calls for controlling weeds at Nine Canyon Wind Farm.  We will spray or pull weeds.</text_data><comment_date>2016-05-06T00:00:00</comment_date></row><row _id="row-a4h5.4xh3~anh3" _uuid="00000000-0000-0000-2106-48405CB83F49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a4h5.4xh3~anh3"><intent_id>1153927</intent_id><project_id>956159</project_id><text_data>1. Install Panosonic bath fan with smart switch. 2. Single Family. 3. Single story. 4a. no. 4b. no. 4c. yes. 4d. no. 4e. no 4f. no 4g. no 4h. no. 4i. no 4j. no 4k. no. i. na. 5. yes. 6. yes. 7. no. 8. No</text_data><comment_date>2021-06-18T00:00:00</comment_date></row><row _id="row-7v47~q5rv_ugcr" _uuid="00000000-0000-0000-F504-4321C994AA76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7v47~q5rv_ugcr"><intent_id>666315</intent_id><project_id>749086</project_id><text_data>This is a JOC filing of an individual job order under Centennial Contractors Ent., Inc.</text_data><comment_date>2014-11-18T00:00:00</comment_date></row><row _id="row-h9w3~qt42_c5gm" _uuid="00000000-0000-0000-DDC2-3DEC795573BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h9w3~qt42_c5gm"><intent_id>542405</intent_id><project_id>698850</project_id><text_data>This project has been canceled. We have a billing into WSU for engineering. According to WSU we must file the intent to receive payment. There will no labor or materials onsite. I am not sure how to file the affidavit.</text_data><comment_date>2012-10-31T00:00:00</comment_date></row><row _id="row-pchs_77qt~nj7i" _uuid="00000000-0000-0000-F482-036BC65943FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pchs_77qt~nj7i"><intent_id>1200030</intent_id><project_id>992226</project_id><text_data>1. Weatherize Home2.Single Family Dwelling3.One Level4. a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no l.no5. yes6.yes7.no8.no</text_data><comment_date>2021-12-16T00:00:00</comment_date></row><row _id="row-ijjb.i9r8-pq2a" _uuid="00000000-0000-0000-F5BA-6F4300151449" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijjb.i9r8-pq2a"><intent_id>1028982</intent_id><project_id>903099</project_id><text_data>Fringe Benefits Per Hour Include:  Health,Welfare,Dental - $9.01; WA Pension - $2.50; Nat'l Pension - $.76; Int'l Training - $.10; Industry Improvement - $.50; JATC - $1.90; Supplemental Pension - $2.94. Hourly Wage includes $2.00 Vacation.</text_data><comment_date>2019-12-29T00:00:00</comment_date></row><row _id="row-hgsr-847n~g85c" _uuid="00000000-0000-0000-2DD3-DE8C09966A3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hgsr-847n~g85c"><intent_id>519315</intent_id><project_id>418040</project_id><text_data>Agency Contact - John WieseContact phone number - 206-920-7632</text_data><comment_date>2012-07-24T00:00:00</comment_date></row><row _id="row-7j6t_be2k~bm88" _uuid="00000000-0000-0000-907A-C33DC1F83DEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7j6t_be2k~bm88"><intent_id>1048412</intent_id><project_id>910941</project_id><comment_date>2020-03-30T00:00:00</comment_date></row><row _id="row-a9hj_fyiw_8ef4" _uuid="00000000-0000-0000-9791-46BF577AC696" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a9hj_fyiw_8ef4"><intent_id>551969</intent_id><project_id>701082</project_id><text_data>We do not carry industrial insurance; we have worker's comp through our insurance agent.</text_data><comment_date>2013-01-15T00:00:00</comment_date></row><row _id="row-5bsy-6je7.rkx9" _uuid="00000000-0000-0000-A423-1E5F305D88C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bsy-6je7.rkx9"><intent_id>538961</intent_id><project_id>692645</project_id><text_data>TRUCK DRIVER OTHER IS FOR TRUCK MOUNTED PICKUP SWEEPER</text_data><comment_date>2012-10-09T00:00:00</comment_date></row><row _id="row-t9dm_7nu2_54s5" _uuid="00000000-0000-0000-73EE-9082C2BFFA3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9dm_7nu2_54s5"><intent_id>592923</intent_id><project_id>719685</project_id><text_data>TECH Review:Subcontractor's WA License Number: TECHRR*879K1,Subcontractor's Federal Tax ID Number:46-2827472</text_data><comment_date>2013-09-11T00:00:00</comment_date></row><row _id="row-59wy_te6b_mw9y" _uuid="00000000-0000-0000-A6C4-98E89482EB05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-59wy_te6b_mw9y"><intent_id>593800</intent_id><project_id>720022</project_id><text_data>Filed by Alam Barrowman</text_data><comment_date>2013-09-16T00:00:00</comment_date></row><row _id="row-9fyq-bry7-ahn8" _uuid="00000000-0000-0000-8833-6A5B8B1FB06E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9fyq-bry7-ahn8"><intent_id>969624</intent_id><project_id>877427</project_id><text_data>1519095</text_data><comment_date>2019-04-04T00:00:00</comment_date></row><row _id="row-wx8w~rtwk-b88b" _uuid="00000000-0000-0000-9B09-0804779EA2F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wx8w~rtwk-b88b"><intent_id>1056551</intent_id><project_id>918255</project_id><text_data>indoor data- telephone cabling</text_data><comment_date>2020-05-07T00:00:00</comment_date></row><row _id="row-sf7s_epu5.zi9g" _uuid="00000000-0000-0000-3AF0-2DFDCFDC10C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sf7s_epu5.zi9g"><intent_id>1023010</intent_id><project_id>895332</project_id><text_data>Job 4672</text_data><comment_date>2019-11-21T00:00:00</comment_date></row><row _id="row-39pe~gj2w~psar" _uuid="00000000-0000-0000-4E45-DE7C17570D75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39pe~gj2w~psar"><intent_id>1467861</intent_id><project_id>1077812</project_id><text_data>GU Job 24-392pwTruck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2024-09-18T00:00:00</comment_date></row><row _id="row-7wd4~686u_xmry" _uuid="00000000-0000-0000-FFFC-DF6B5F86AD8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7wd4~686u_xmry"><intent_id>1465288</intent_id><project_id>1146152</project_id><text_data>#24-003</text_data><comment_date>2024-09-10T00:00:00</comment_date></row><row _id="row-sby3.vgq8.jdnq" _uuid="00000000-0000-0000-F832-41196F1936AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sby3.vgq8.jdnq"><intent_id>765133</intent_id><project_id>767918</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2016-06-16T00:00:00</comment_date></row><row _id="row-ppt6-7tiu_hksg" _uuid="00000000-0000-0000-B261-1730C91E79D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ppt6-7tiu_hksg"><intent_id>887615</intent_id><project_id>823535</project_id><text_data>industrial insurance is covered by the jones act</text_data><comment_date>2018-02-09T00:00:00</comment_date></row><row _id="row-8ixn.7csj_avtc" _uuid="00000000-0000-0000-B0C5-163AEF15F58A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ixn.7csj_avtc"><intent_id>968784</intent_id><project_id>818799</project_id><text_data>Supply &amp; Install LLDPE Liner</text_data><comment_date>2019-04-01T00:00:00</comment_date></row><row _id="row-n85j_cgx4.ryu3" _uuid="00000000-0000-0000-04AD-05550430EF42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n85j_cgx4.ryu3"><intent_id>790696</intent_id><project_id>802995</project_id><text_data>1. Weatherization 2. yes 3. 1 4. a.no b.no c. yes d.no e. no f. no g. no h.no i. no j. no k. no 6. yes 7. no 8. no</text_data><comment_date>2016-09-21T00:00:00</comment_date></row><row _id="row-msjm.7imf.8jx6" _uuid="00000000-0000-0000-EFAF-621BF5CE3AF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-msjm.7imf.8jx6"><intent_id>1138434</intent_id><project_id>959578</project_id><text_data>Fringes: Vacation $5.50, Assessment $1.30, Insurance $9.01, Pension $12.36, Training $2.33, Industry Improvement $.50</text_data><comment_date>2021-04-23T00:00:00</comment_date></row><row _id="row-5799_2n5s~fn3e" _uuid="00000000-0000-0000-4394-537F66CC443E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5799_2n5s~fn3e"><intent_id>1193505</intent_id><project_id>986211</project_id><text_data>Single Family Dwelling</text_data><comment_date>2021-11-16T00:00:00</comment_date></row><row _id="row-dqen~dxp8_2mjt" _uuid="00000000-0000-0000-59EE-91D6D9B616CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dqen~dxp8_2mjt"><intent_id>686846</intent_id><project_id>759006</project_id><text_data>This project is to add rubber infill and groom the synthetic turf field utilizing a laymore and forklift as the equipment.</text_data><comment_date>2015-04-01T00:00:00</comment_date></row><row _id="row-q28d.qbug~357x" _uuid="00000000-0000-0000-E6A9-DC4F3CC4193E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q28d.qbug~357x"><intent_id>687005</intent_id><project_id>759072</project_id><text_data>The purpose of this tank is for drinking water. This is 1 of 2 concrete water reservoirs that sit side by side.This concrete tank leaked water after it was put into service. The contractor to &amp;quot;fix&amp;quot; the leak then applied a product called CIM to the inside where cracks had occurred. Approximately 10 years later it still leaks. The CIM representative said that the initial application was applied incorrectly and thus it continues to leak.Our company will be reapplying CIM to the walls after it has been prepped and approved by the CIM rep for re-application. The application process for applying the CIM is mixing 2 type of products together and the spraying it onto the walls with a special sprayer. Actual spray time for this product is about 1 hour. The labor is all in the prep of the interior concrete walls.</text_data><comment_date>2015-04-03T00:00:00</comment_date></row><row _id="row-cepz~a2vi-xdid" _uuid="00000000-0000-0000-9B35-8A54863C3ADD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cepz~a2vi-xdid"><intent_id>1020421</intent_id><project_id>898921</project_id><comment_date>2019-11-07T00:00:00</comment_date></row><row _id="row-i2ys.7ge6-dgx9" _uuid="00000000-0000-0000-6D40-9D72F9466C56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2ys.7ge6-dgx9"><intent_id>497515</intent_id><project_id>670467</project_id><text_data>I submitted this intent to pay prevailing wages under Joe Rada Construction, but the company name at the time of completion was Joe Rada Excavating. So am resubmitting under previous name.</text_data><comment_date>2012-01-22T00:00:00</comment_date></row><row _id="row-xjd4.bh95.c3v9" _uuid="00000000-0000-0000-CBEE-E7E40B7BE5D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xjd4.bh95.c3v9"><intent_id>894469</intent_id><project_id>846547</project_id><text_data>Job # 0528</text_data><comment_date>2018-03-23T00:00:00</comment_date></row><row _id="row-8u63.9v6s-e5mu" _uuid="00000000-0000-0000-F45C-2D72CED4A0C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8u63.9v6s-e5mu"><intent_id>981508</intent_id><project_id>882728</project_id><text_data>Open PO 190716 not to exceed $20,000.00</text_data><comment_date>2019-05-31T00:00:00</comment_date></row><row _id="row-599v~5gr4-xu6d" _uuid="00000000-0000-0000-3F97-38352961417C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-599v~5gr4-xu6d"><intent_id>520582</intent_id><project_id>690856</project_id><text_data>Other Truck: 4-Axle Kenworth Tractor pulling 3-Axle Belly Dump hauling crushed rock</text_data><comment_date>2012-07-05T00:00:00</comment_date></row><row _id="row-335u_bmcb_36vj" _uuid="00000000-0000-0000-856D-8BFDDE2F8B28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-335u_bmcb_36vj"><intent_id>655737</intent_id><project_id>744830</project_id><text_data>other truck = lowboy to transport equipment</text_data><comment_date>2014-09-19T00:00:00</comment_date></row><row _id="row-2tpq_zmd6~s8k5" _uuid="00000000-0000-0000-1266-90B45BDF892D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tpq_zmd6~s8k5"><intent_id>779693</intent_id><project_id>795764</project_id><text_data>HIRED BY ZAVALA CORP</text_data><comment_date>2016-08-03T00:00:00</comment_date></row><row _id="row-c6fv-4ks5~3m6w" _uuid="00000000-0000-0000-FD4F-21D5A0D74C1F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6fv-4ks5~3m6w"><intent_id>1317111</intent_id><project_id>1050552</project_id><text_data>1-Siding &amp; Window Installation2-Apartments3- 34a-No4b-No4c-Yes4d-No4e-No4f-No4g-No4h-No4i-No4j-No4k-No4l-No5-Yes6-Yes7-Yes8-No</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-drv8-ai7p_vrnt" _uuid="00000000-0000-0000-0F7C-75A5E30D33C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-drv8-ai7p_vrnt"><intent_id>791908</intent_id><project_id>801424</project_id><text_data>Filed by K. Daryl Jones.</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-zdmc~r8vd.mcn4" _uuid="00000000-0000-0000-47E0-FA45806D4D28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdmc~r8vd.mcn4"><intent_id>924308</intent_id><project_id>856896</project_id><text_data>0818082</text_data><comment_date>2018-08-09T00:00:00</comment_date></row><row _id="row-wjc4~zaqb_bhjd" _uuid="00000000-0000-0000-4FBD-73643AEFBD3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wjc4~zaqb_bhjd"><intent_id>1219181</intent_id><project_id>1004487</project_id><text_data>INV # 88443103 SR # 51258036</text_data><comment_date>2022-03-18T00:00:00</comment_date></row><row _id="row-v3tb~b3kb-kzxe" _uuid="00000000-0000-0000-AC42-F1C15F50DD7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3tb~b3kb-kzxe"><intent_id>613282</intent_id><project_id>727869</project_id><text_data>Project includes the following:       1.  Weeding all planted areas - use of gloves, troughs, and claw tool, rackes and shovels;       2.  Trimming rose bushes and juniper bushes, oregon grape - use of clippers, power hedge trimmers, rakes;       3.  Blow off walks and parking lots - use of power blower;       4.  Weedeat grass area around parking lot - use of weedeater.</text_data><comment_date>2014-01-31T00:00:00</comment_date></row><row _id="row-hxwe~dp29.8zzp" _uuid="00000000-0000-0000-42DB-D0F421056DC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxwe~dp29.8zzp"><intent_id>824844</intent_id><project_id>817419</project_id><text_data>Electronic Technician tech to pull Cat 6 data cable from IDF,MDF to camera locations inside School.</text_data><comment_date>2017-04-11T00:00:00</comment_date></row><row _id="row-p9d8_izrd_h76v" _uuid="00000000-0000-0000-4C2E-3C0F53081C4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p9d8_izrd_h76v"><intent_id>628867</intent_id><project_id>734672</project_id><text_data>Item breakdown for Groundperson - wage $20.40/hr. Fringes per hour: Appr Training 1% (.204), Health &amp; Welfare (5.00), Indv Pension (4.02), NEBF pension 3% (0.612) - Total fringe is $9.836</text_data><comment_date>2014-05-12T00:00:00</comment_date></row><row _id="row-ucr6-rdwn~eg5i" _uuid="00000000-0000-0000-E181-B5E270906FC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ucr6-rdwn~eg5i"><intent_id>857946</intent_id><project_id>830732</project_id><text_data>GENERAL LABOR - SHOVELING ROCKOTHER TRUCKS - 1,500 GAL OIL DISTRIBUTOR SHOOTING CSS-1 TACK ON RUNWAYOTHER TRUCKS - 3,000 GAL WATER TRUCK SPRAYING WATER ON RUNWAY</text_data><comment_date>2017-08-23T00:00:00</comment_date></row><row _id="row-dkwj_ndnq_hywe" _uuid="00000000-0000-0000-4977-C12864203D76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dkwj_ndnq_hywe"><intent_id>1221958</intent_id><project_id>992928</project_id><comment_date>2022-03-30T00:00:00</comment_date></row><row _id="row-szfd-3564.j6kt" _uuid="00000000-0000-0000-2BBA-682DA752E66F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-szfd-3564.j6kt"><intent_id>780100</intent_id><project_id>797269</project_id><text_data>1) Ran power for a new heat pump. 2)Yes 3) 1-story  4) residential living a) No  b) No  c) yes  d) No  3) No  f) No  g) No  h) No  i) No  j) No  k) No  5) House has a kitchen yes  6) House has a bathroom yes  7) No  8) No</text_data><comment_date>2016-08-05T00:00:00</comment_date></row><row _id="row-q3qg_355d~h6ya" _uuid="00000000-0000-0000-EB5F-CF797751F1EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q3qg_355d~h6ya"><intent_id>697079</intent_id><project_id>763377</project_id><text_data>PC6 #906-1</text_data><comment_date>2015-05-28T00:00:00</comment_date></row><row _id="row-9sxq-crcz-677d" _uuid="00000000-0000-0000-044C-945D0621BB8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9sxq-crcz-677d"><intent_id>519906</intent_id><project_id>690643</project_id><text_data>Jacob Lloyd and Curtis Strole will be the 2 Premium Painting, Inc. non-owner employees possible assigned to this project.</text_data><comment_date>2012-06-30T00:00:00</comment_date></row><row _id="row-nd65.6b63_qqdi" _uuid="00000000-0000-0000-D102-84ADD43E5BCC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nd65.6b63_qqdi"><intent_id>589432</intent_id><project_id>718413</project_id><text_data>Bark installation at a 1&amp;quot;-2&amp;quot; depth via a 4&amp;quot; blower hoses out of a blower truck for beautification.</text_data><comment_date>2013-08-22T00:00:00</comment_date></row><row _id="row-6fmv~tu4c_5q4d" _uuid="00000000-0000-0000-EC9C-A376457B44A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6fmv~tu4c_5q4d"><intent_id>1215734</intent_id><project_id>967553</project_id><text_data>Painting a mural</text_data><comment_date>2022-10-31T00:00:00</comment_date></row><row _id="row-qbuf_uz8m.6xpi" _uuid="00000000-0000-0000-ED91-8942038EEB28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbuf_uz8m.6xpi"><intent_id>881034</intent_id><project_id>840324</project_id><text_data>Filed by R. T. Vatne</text_data><comment_date>2017-12-28T00:00:00</comment_date></row><row _id="row-48g4-iigh.f96t" _uuid="00000000-0000-0000-21ED-F7D20DBA3274" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48g4-iigh.f96t"><intent_id>1116097</intent_id><project_id>925831</project_id><text_data>M2443 LIGO EXPLORATION CENTER</text_data><comment_date>2021-01-19T00:00:00</comment_date></row><row _id="row-rqhi~ydbw-dyrc" _uuid="00000000-0000-0000-FB23-2602ED88983A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rqhi~ydbw-dyrc"><intent_id>866222</intent_id><project_id>831816</project_id><text_data>No industrial insurance account ID. Montana company with workers comp coverage that extends into Washington</text_data><comment_date>2017-09-30T00:00:00</comment_date></row><row _id="row-j7w3_h7i7-g5d4" _uuid="00000000-0000-0000-E7B0-F22B24C8D9CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j7w3_h7i7-g5d4"><intent_id>1145774</intent_id><project_id>952917</project_id><text_data>hydroseed for beautification purpose</text_data><comment_date>2021-05-19T00:00:00</comment_date></row><row _id="row-z5c6~9smh~iehu" _uuid="00000000-0000-0000-CE3C-47AA55D05057" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z5c6~9smh~iehu"><intent_id>739636</intent_id><project_id>781086</project_id><text_data>Filed by Julie Petit</text_data><comment_date>2015-12-30T00:00:00</comment_date></row><row _id="row-dmit~dwie_jtnx" _uuid="00000000-0000-0000-2776-3CBCE3D4CBFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dmit~dwie_jtnx"><intent_id>1318655</intent_id><project_id>1062736</project_id><text_data>INV # 89669413 SR # 54087672</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-uwmf-bjwf.qvzk" _uuid="00000000-0000-0000-FBDA-A0F0CFFD481D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwmf-bjwf.qvzk"><intent_id>881111</intent_id><project_id>840360</project_id><text_data>Filed by Eric E. Anderson</text_data><comment_date>2017-12-28T00:00:00</comment_date></row><row _id="row-yq6d-rvtu~gn95" _uuid="00000000-0000-0000-75B8-8CB6C2D26065" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yq6d-rvtu~gn95"><intent_id>988053</intent_id><project_id>885753</project_id><text_data>$6.24 Fringe:  Enrolled employees for Medical/Health ProgramLaborer:  ShovelTruck and Trailer:  Mob EquipmentOther Truck-WATER Truck:  Dust Control/Clean Asphalt</text_data><comment_date>2019-06-27T00:00:00</comment_date></row><row _id="row-khn3.c6mn.qs97" _uuid="00000000-0000-0000-F3E6-85C188C26618" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-khn3.c6mn.qs97"><intent_id>1142757</intent_id><project_id>958172</project_id><text_data>Fringes  Truck Drivers  20.92   Medical 10.78   Pension 9.44  Training .70Power Equipment Operators  22.47   Medical 6.57  Pension 15.15  Training .75Laborers  12.64  Medical 6.70 Pension 4.79  Training .95  Lecet Laborers Employers Cooperation and Education Team .14Wcisap Washington Construction industry substance abuse program .06</text_data><comment_date>2021-05-07T00:00:00</comment_date></row><row _id="row-s25y_i6wr.n83f" _uuid="00000000-0000-0000-0D89-D3AAAFB1087B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s25y_i6wr.n83f"><intent_id>1225469</intent_id><project_id>1008462</project_id><text_data>303659</text_data><comment_date>2022-04-13T00:00:00</comment_date></row><row _id="row-hphk-5wfz.nfqg" _uuid="00000000-0000-0000-D642-4E39D7CC1C84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hphk-5wfz.nfqg"><intent_id>1467317</intent_id><project_id>1130749</project_id><text_data>6762sf Standard Installation of  SofSURFACES Tiles and Materials Over Asphalt Sub Base. IncludesCompressed Installation of SofTILE. Soft Surface labors will complete this task</text_data><comment_date>2024-09-17T00:00:00</comment_date></row><row _id="row-beic.4q6h~ny8c" _uuid="00000000-0000-0000-B678-3FF27D2320D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-beic.4q6h~ny8c"><intent_id>698368</intent_id><project_id>763914</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2015-06-04T00:00:00</comment_date></row><row _id="row-jdhm_6m4x-d2xg" _uuid="00000000-0000-0000-72D2-B52339F24F74" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jdhm_6m4x-d2xg"><intent_id>1200022</intent_id><project_id>992219</project_id><text_data>7:30Called out for a floor drain in cell block c backing up. When toilet was flushed it backed up more. Pulled cast iron cap to the clean-out on the right of the back toilet. Ran bare cable out 35 feet to blockage and the line started draining. Pulled back towels and a sheet. Line stopped draining. Cabled back to blockage, brought back another towel and the line drained out. Reinstalled the cast iron cap on the clean-out and secured screws. Flushed both toilets multiple times with and without toilet paper. The line is open and draining. No guarantee due to what inmates are flushing down the toilet.</text_data><comment_date>2021-12-16T00:00:00</comment_date></row><row _id="row-4wrr~v4nz.esrp" _uuid="00000000-0000-0000-FBE5-8A6866FCB10A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4wrr~v4nz.esrp"><intent_id>567563</intent_id><project_id>709858</project_id><text_data>Beautification of areas adjacent to roadway the installation of trees and shrubs, topsoil, bark mulch, and grass.  Equip:  Bobcat, hydroseeder, hand tools.</text_data><comment_date>2013-05-02T00:00:00</comment_date></row><row _id="row-igyp_phek.r2ei" _uuid="00000000-0000-0000-EE30-A391BF1BA7D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-igyp_phek.r2ei"><intent_id>944608</intent_id><project_id>865980</project_id><text_data>Note: Workers who perform work on the electrical side of generators (for example, this includes - but is not limited to - load, battery, and transfer tests) must be compensated at the Inside Wireman Electrician/Journey Level (WAC 296-127-01323) prevailing rate of wage for this work. You must specify the nature of the work performed on this generator when filing the Affidavit and keep time records of start/stop times within each classification that are available upon request.</text_data><comment_date>2019-01-20T00:00:00</comment_date></row><row _id="row-3rf6~ityk~w6w8" _uuid="00000000-0000-0000-3BA8-F2939DF18F81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3rf6~ityk~w6w8"><intent_id>763268</intent_id><project_id>785626</project_id><text_data>File by Linnie ShaverState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- Meany Middle School ReconfigurationPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?Remodel.2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.) Does this project entail the remodeling or new construction of a facility?Yes but not performed by Siemens.4.) If your firm is working upon a type of building system, what type of system is involved? HVAC Control System.5.) What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.) Are you going to be hiring any subcontractors for this project?Yes.To expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2016-05-19T00:00:00</comment_date></row><row _id="row-zfdz_87t7~umdh" _uuid="00000000-0000-0000-59D4-0F37A3C75929" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zfdz_87t7~umdh"><intent_id>590080</intent_id><project_id>718624</project_id><text_data>This is a time and material job</text_data><comment_date>2013-08-27T00:00:00</comment_date></row><row _id="row-exde_n973.s28z" _uuid="00000000-0000-0000-1681-A1915AFC7074" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-exde_n973.s28z"><intent_id>648256</intent_id><project_id>731272</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-08-20T00:00:00</comment_date></row><row _id="row-8eqj.5cq4~3875" _uuid="00000000-0000-0000-C615-5BA2F7DA00EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8eqj.5cq4~3875"><intent_id>1223068</intent_id><project_id>1006880</project_id><text_data>I tried to go back and adjust the hourly wage for for selected trade, but will not let me adjust rate. We are a owner/operator, so my rate is higher then a journey level wage makes.</text_data><comment_date>2022-04-22T00:00:00</comment_date></row><row _id="row-26mf~8c84-z57y" _uuid="00000000-0000-0000-D212-25ADD7D537B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-26mf~8c84-z57y"><intent_id>958334</intent_id><project_id>872293</project_id><text_data>Install cables that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2019-02-01T00:00:00</comment_date></row><row _id="row-nyrq-qs3w~4z83" _uuid="00000000-0000-0000-B764-4035B4F9F43A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nyrq-qs3w~4z83"><intent_id>918970</intent_id><project_id>855547</project_id><text_data>SRV job# 1226TRUCKSlowboy delivers asphalt rotomill to jobsite</text_data><comment_date>2018-07-18T00:00:00</comment_date></row><row _id="row-vdvc.d85s_ist5" _uuid="00000000-0000-0000-5524-64095E8A9490" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vdvc.d85s_ist5"><intent_id>720182</intent_id><project_id>772166</project_id><text_data>Laborers - General:  Workers performing manual labor with hand tools (shovels, rakes, hoes)Other Trucks:  Water Trucks &amp;lt; 3000 gal and Fuel/Service Greaser Trucks</text_data><comment_date>2015-09-11T00:00:00</comment_date></row><row _id="row-9vra~d7nw-5mg2" _uuid="00000000-0000-0000-F45A-48439D5D5BB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9vra~d7nw-5mg2"><intent_id>768749</intent_id><project_id>787347</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2016-06-16T00:00:00</comment_date></row><row _id="row-m7y9~icjv.7qqf" _uuid="00000000-0000-0000-9DEA-1F8EF13359EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7y9~icjv.7qqf"><intent_id>622506</intent_id><project_id>731978</project_id><text_data>The project consists of installing hing kits on exhaust fan units and repairing some control dampers.. The labor will assist the owner in these tasks.. required tools are general hand tools and a drill.. No other special tools or equipment is required</text_data><comment_date>2014-04-01T00:00:00</comment_date></row><row _id="row-qgif~pjx3~wzf7" _uuid="00000000-0000-0000-E4F0-9B5D5AEE747F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qgif~pjx3~wzf7"><intent_id>817758</intent_id><project_id>802989</project_id><text_data>Semi-Tractor with Trailer.  Trailer is 20 CY Side Dump</text_data><comment_date>2017-02-24T00:00:00</comment_date></row><row _id="row-t3kt~2863~54s2" _uuid="00000000-0000-0000-6B49-8B62C45F7659" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3kt~2863~54s2"><intent_id>1000341</intent_id><project_id>890562</project_id><text_data>1) replace water heater and tstat, clean &amp; tune 2) single family dwelling 3) 1 level 4a) No 4b) No 4c) Yes 4d) No 4e) No 4f) No 4g) No 4h) No 4i) No 4j) No 4k) No 4l) N/A 5) Yes 6) Yes 7) No 8) No</text_data><comment_date>2019-08-21T00:00:00</comment_date></row><row _id="row-xbkk.7zme-5ii4" _uuid="00000000-0000-0000-36FD-20DB49AA07B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xbkk.7zme-5ii4"><intent_id>1094388</intent_id><project_id>935568</project_id><text_data>YR 06-01-20 THUR 05-31-21 EVEMAINT</text_data><comment_date>2020-10-08T00:00:00</comment_date></row><row _id="row-bjye.gr2i.vvip" _uuid="00000000-0000-0000-6ACF-758729D18741" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjye.gr2i.vvip"><intent_id>866898</intent_id><project_id>823914</project_id><text_data>Scope of project includes two way turn lane improvements such as new asphalt, installing new seeding, topsoil, all new plantings and bark covering. The part of Nature Perfect is to install the bark/mulch by blower truck.</text_data><comment_date>2017-10-17T00:00:00</comment_date></row><row _id="row-85gt.au4w-5awi" _uuid="00000000-0000-0000-80BC-AD7B8F0043A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-85gt.au4w-5awi"><intent_id>954684</intent_id><project_id>870548</project_id><text_data>Filed by Daphne Thomas</text_data><comment_date>2019-01-11T00:00:00</comment_date></row><row _id="row-5tdm.zcps_fiv2" _uuid="00000000-0000-0000-EB7A-7D8A1A5E7539" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5tdm.zcps_fiv2"><intent_id>1146073</intent_id><project_id>921649</project_id><text_data>Fringe is paid in cash</text_data><comment_date>2021-06-02T00:00:00</comment_date></row><row _id="row-9kqf~bh9p_aphs" _uuid="00000000-0000-0000-C57E-AC70CE2840DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9kqf~bh9p_aphs"><intent_id>915574</intent_id><project_id>815999</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK &amp;quot;POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)&amp;quot; USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2018-07-03T00:00:00</comment_date></row><row _id="row-d22m_2rq8-knfz" _uuid="00000000-0000-0000-F49A-271C0D8FAD69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d22m_2rq8-knfz"><intent_id>521679</intent_id><project_id>669728</project_id><text_data>We are an Oregon employer with industrial insurance through SAIF.</text_data><comment_date>2012-07-11T00:00:00</comment_date></row><row _id="row-q285~mj2s~82kn" _uuid="00000000-0000-0000-7458-DCAB0E67F3B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q285~mj2s~82kn"><intent_id>772775</intent_id><project_id>795220</project_id><text_data>this is a landscape and irrigation system to a renovated PUD substation in Everett WA. We will be performing all activities on the project. we will be spreading 8 &amp;quot; of topsoil, installing plants and installing a sprinkler system and beauty bark throughout the project. We will be using F 250, F 450, and Isuzu flat bed trucks for picking up materials or larger orders delivered by our suppliers. We will be using bobcat track loaders and mini track hoes for digging and moving soils and materials.There are no french drains or sub surface water applications to our portion of the project.</text_data><comment_date>2016-07-06T00:00:00</comment_date></row><row _id="row-h94p.pt5b-83yj" _uuid="00000000-0000-0000-5649-CF122B82E640" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h94p.pt5b-83yj"><intent_id>779621</intent_id><project_id>798767</project_id><text_data>Blairco Job 16-6785#1 - Install Ductless Heat Pump#2 - Mobile Home#3 - One#4 a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no#5 - Yes#6 - Yes#7 - Unknown#8 - No</text_data><comment_date>2016-08-03T00:00:00</comment_date></row><row _id="row-8m9e~22gi_i7pm" _uuid="00000000-0000-0000-7A45-9D9726E1B719" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8m9e~22gi_i7pm"><intent_id>1131196</intent_id><project_id>955586</project_id><text_data>February 24, 2021   Prevailing Wage SectionDepartment of Labor &amp; IndustriesPO Box 44540Olympia, WA 98504-4540 Subject:         Statement of Intent to Pay Prevailing Wages                       Project: City of Bellevue � Municipal Center This letter is intended to address our request for an exemption for prevailing wages for the subject project. The project name is as stated in the Subject line above. Our contract is with City of Bellevue who has hired us to perform professional services, specifically the task of electrical maintenance testing for 15KV Incoming Utility Service Switchboard Assembly at the Municipal Center complex located in Bellevue, Washington for the subject project.  1.   Purpose of Project:a.   The purpose of the work performed by Sigma Six Solutions is to test the 15KV Incoming Utility Service Switchboard Assembly for the subject project. 2.   Remodeling or New Construction:a.   Sigma Six�s work does not entail remodeling or construction activities or tasks; the work to be performed is only professional services in the capacity of electrical testing.  3.   Specific Tasks Performed by Sigma Six Solutions:a.   Holmes Electric craftsmen (licensed electricians) will perform all labor and tool work associated with any assembly and installation work. The electrical testing performed by Sigma Six Solutions� field engineers and technicians will not involve any disassembly or re-assembly activity.b.   A Sigma Six employee will operate portable test equipment to perform the tests on the subject components. The test equipment is owned by Sigma Six and is not part of the project or product involved. No tool work, assembly, disassembly, or any other construction craft activity will be performed by any Sigma Six employee. All such labor will be performed by Holmes Electric electricians.c.    A Sigma Six employee will record data observed during testing and provide City of Bellevue with a written report of test results. 4.   Tools Used by Sigma Six Solutions:a.   No hand or construction tools will be used by the Sigma Six field engineer. All tool work will be performed by Holmes Electric electricians as described above. Please feel free to contact me (253-333-9730) if further information or clarification is desired. Sincerely,Todd HaleOperations ManagerSigma Six Solutions</text_data><comment_date>2021-03-24T00:00:00</comment_date></row><row _id="row-4dtv~sgq2-wctu" _uuid="00000000-0000-0000-62F6-D03AE285BD35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4dtv~sgq2-wctu"><intent_id>993383</intent_id><project_id>887796</project_id><text_data>Pump and clean various grease traps</text_data><comment_date>2019-07-20T00:00:00</comment_date></row><row _id="row-2t36-uqdc-wpwa" _uuid="00000000-0000-0000-FB4F-254AA5ED2921" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2t36-uqdc-wpwa"><intent_id>695108</intent_id><project_id>712772</project_id><text_data>We are an Oregon employer with industrial insurance through SAIF.</text_data><comment_date>2015-05-18T00:00:00</comment_date></row><row _id="row-j6dk.ke6k-6pbu" _uuid="00000000-0000-0000-F0EB-86F90880E85D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j6dk.ke6k-6pbu"><intent_id>497609</intent_id><project_id>681014</project_id><text_data>Deborah Willison4672 Birch Bay Lynden Rd #86Blaine, WA 98230</text_data><comment_date>2012-01-23T00:00:00</comment_date></row><row _id="row-xy8y_4v3u.xvse" _uuid="00000000-0000-0000-8DA5-1081F28E96D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xy8y_4v3u.xvse"><intent_id>543172</intent_id><project_id>699160</project_id><text_data>Sent email:  On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2012-11-20T00:00:00</comment_date></row><row _id="row-actb_5wxp_phvs" _uuid="00000000-0000-0000-F3A8-9CDE880CAB8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-actb_5wxp_phvs"><intent_id>712946</intent_id><project_id>769396</project_id><text_data>Number of workers 3, Rate of Hourly Pay $17.00 and Benefits $$2.91.Rate of Hourly Usual (�Fringe�) Benefits will be $2.91 (not $19.00).  Health Insurance = $2.26, and Vacation = $.65.</text_data><comment_date>2015-08-11T00:00:00</comment_date></row><row _id="row-fvpi.ktsg_hutg" _uuid="00000000-0000-0000-B91A-151CF22767D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fvpi.ktsg_hutg"><intent_id>836379</intent_id><project_id>804371</project_id><text_data>The project consists of construction site improvements for recreational facilities at the District&amp;#39;s Crescent Bar site. Project area improvements and various other construction and reconstruction projects that the General Contractor will be responsible for. Our portion of the work consists of restoration seeding and planting as well as irrigation.</text_data><comment_date>2017-05-25T00:00:00</comment_date></row><row _id="row-s42k-ng2c_njht" _uuid="00000000-0000-0000-F65E-3056757C668E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s42k-ng2c_njht"><intent_id>703628</intent_id><project_id>766005</project_id><text_data>#1.  We are to renovate the house to get it ready to sell, exterior paint &amp; interior minor repairs and painting.  #2.  It is a single family resident.  #3.  Single story house.  #4. a) no b) no c) yes d) no e) no f) no g) no h) no i) no j) no k) no l) no #5. yes #6. yes #7. no #8. no</text_data><comment_date>2015-06-25T00:00:00</comment_date></row><row _id="row-4cw5~38bh~6iae" _uuid="00000000-0000-0000-070A-6C042729A9EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4cw5~38bh~6iae"><intent_id>499198</intent_id><project_id>682266</project_id><text_data>#1. single family dewelling #2. No basement, 1 attached garage, 1 story #3 - What is the facility used for? --Answer �yes� or �no� to each of the following options: (a) Permanent residence only? Yes (b) Rehabilitation house? No (c) Transitional housing? no (d) Communal dining facility? no (e) Treatment services? no (f) Counseling? (g)no Other? Personel Housing #4 - Does each dwelling unit have its own self-contained kitchen? Yes #5 - Does each dwelling unit have its own bathroom? Yes #6 - Is there a community facility or manager�s office on site? no #7 - Is any part of the facility used by members of the public? no</text_data><comment_date>2012-02-08T00:00:00</comment_date></row><row _id="row-9vxs-gqz9~mre3" _uuid="00000000-0000-0000-63B8-B137DB023691" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9vxs-gqz9~mre3"><intent_id>667717</intent_id><project_id>749733</project_id><text_data>Low Income Single Family Weatherization/Insulation retrofit upgrade</text_data><comment_date>2014-11-29T00:00:00</comment_date></row><row _id="row-rk5m~3fe8-5tea" _uuid="00000000-0000-0000-8FCA-83A73563160F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rk5m~3fe8-5tea"><intent_id>1258033</intent_id><project_id>1026489</project_id><text_data>Irrigation repairs. Adjust and replace irrigation heads and nozzles</text_data><comment_date>2022-08-15T00:00:00</comment_date></row><row _id="row-da3q_aht7.6wwb" _uuid="00000000-0000-0000-3B0B-859DFEDD6D91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-da3q_aht7.6wwb"><intent_id>1266753</intent_id><project_id>1031114</project_id><comment_date>2022-09-15T00:00:00</comment_date></row><row _id="row-ree3~e8dy~rx6f" _uuid="00000000-0000-0000-7D49-F15C59C72EE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ree3~e8dy~rx6f"><intent_id>1265459</intent_id><project_id>1023256</project_id><text_data>ACI 22-023</text_data><comment_date>2022-09-09T00:00:00</comment_date></row><row _id="row-4k89-wusi.fgt4" _uuid="00000000-0000-0000-0567-8FB9E9F7B468" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4k89-wusi.fgt4"><intent_id>1124756</intent_id><project_id>951975</project_id><text_data>1.- General weatherization /Repairs/ Energy upgrades.2.- Single home3.- 2 levels4.- a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-no.5.- yes6.- yes7.-no</text_data><comment_date>2021-02-24T00:00:00</comment_date></row><row _id="row-2zpq~eh55-uk9v" _uuid="00000000-0000-0000-FD40-9656633F6DD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2zpq~eh55-uk9v"><intent_id>596321</intent_id><project_id>717709</project_id><text_data>Form Filed By: Gregg Taylor</text_data><comment_date>2013-09-27T00:00:00</comment_date></row><row _id="row-jnnm-h3sh.bvbd" _uuid="00000000-0000-0000-7A37-AE9FAF3E48BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jnnm-h3sh.bvbd"><intent_id>905432</intent_id><project_id>844441</project_id><text_data>TIME	HOL	PEN 	HEALTH  TotalPER HR	PER HR	PER HR	PER HR $2.15 	 $0.97 	 $1.20 	 $9.24  $13.56</text_data><comment_date>2018-05-17T00:00:00</comment_date></row><row _id="row-yjh6~ta76.iekx" _uuid="00000000-0000-0000-C831-38FF3A6B5A4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yjh6~ta76.iekx"><intent_id>1455529</intent_id><project_id>1139327</project_id><text_data>Corrected worker fringe and wage values PJS</text_data><comment_date>2024-09-20T00:00:00</comment_date></row><row _id="row-8vyp.2hb8.yza5" _uuid="00000000-0000-0000-02B8-9020F42E4201" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8vyp.2hb8.yza5"><intent_id>1469489</intent_id><project_id>1146534</project_id><text_data>9953862</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-i9h3_djne.p6ty" _uuid="00000000-0000-0000-D04C-CFFA28FD776D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9h3_djne.p6ty"><intent_id>903296</intent_id><project_id>829351</project_id><text_data>When chosing &amp;quot;residential - Laborers&amp;quot; it does not give me the classifications I need.. On this project for Davis Bacon Residential rates, I am looking for Laborer (Mason Tender - Brick) Rate:$34.42 + Fringe 10.80 = $45.22But it does not give me any choices when trying to click on Residential - Laborer... it pops up with Residential Cement Mason rates... So I have the State classification listed for the David Bacon Residential Rate Listed</text_data><comment_date>2018-05-08T00:00:00</comment_date></row><row _id="row-edaw.gkav-ixk4" _uuid="00000000-0000-0000-336F-14A448C4802F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-edaw.gkav-ixk4"><intent_id>1219059</intent_id><project_id>1004423</project_id><text_data>9885334</text_data><comment_date>2022-03-18T00:00:00</comment_date></row><row _id="row-tubb.h5w8_6u3n" _uuid="00000000-0000-0000-106D-27E72040A911" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tubb.h5w8_6u3n"><intent_id>880447</intent_id><project_id>833204</project_id><text_data>3000430</text_data><comment_date>2017-12-21T00:00:00</comment_date></row><row _id="row-ywnt_cm38-7u4e" _uuid="00000000-0000-0000-D86B-3F3D8C6CAE89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ywnt_cm38-7u4e"><intent_id>553084</intent_id><project_id>702956</project_id><text_data>1. Our company was hired by Dirtek LLC to oversee and Supervise the clean up, asbestos abatement and demolition of the single family residence that has been tagged by the health department as a home contaminated by methamphetamine.2. The home is a 3 bedroom, 1 bath rambler built in 1917, approximately 968 sf.3. The home is a single story rambler with a large crawl space / storage area beneath the home, that can be accessed from an exterior door on the south end of the home.4a. no4b. no4c. yes, this was a family's residence4d. no4e. no4f. no4g. no4h. no4i. no4j. no5. This single family home has a kitchen.6. This single family home has one bathroom.7. There is no community facility or manager's office on this property.8. No part of the single family home was used by members of the public.</text_data><comment_date>2013-01-26T00:00:00</comment_date></row><row _id="row-zfkz-nrad.3hfw" _uuid="00000000-0000-0000-D1AF-6A797308074C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zfkz-nrad.3hfw"><intent_id>863193</intent_id><project_id>822087</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2017-09-15T00:00:00</comment_date></row><row _id="row-fn5e.8dr6-7zpe" _uuid="00000000-0000-0000-51DA-DB7EB2219432" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fn5e.8dr6-7zpe"><intent_id>465793</intent_id><project_id>635613</project_id><text_data>Journeyman Plumbers &amp; Pipefitter Fringe benefits: Health &amp; Welfare $8.16 - Vacation $5.50 - WA State Pension $4.56 - Supplemental Pension $3.25 - National Pension Fund 3.23 - JATC - $1.38 - Assessment Check Off $1.05 - Industry Improvement Trust $0.43 - International Training Fund $0.10 - MCAWW Dues $0.10</text_data><comment_date>2011-07-14T00:00:00</comment_date></row><row _id="row-j2ev~x5e8-yhnu" _uuid="00000000-0000-0000-B96F-DD08862CC9EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j2ev~x5e8-yhnu"><intent_id>749982</intent_id><project_id>786621</project_id><text_data>Job # 8011317</text_data><comment_date>2016-03-07T00:00:00</comment_date></row><row _id="row-ikxd_frmd_mm9w" _uuid="00000000-0000-0000-C5CB-6A82A408B9DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ikxd_frmd_mm9w"><intent_id>1317260</intent_id><project_id>1061931</project_id><text_data>1 - Provide &amp; install flooring in housing unit2 - Yes - Apt3 - 1 story4 - HousingA) NoB) NoC) YesD) NoE) NoF) NoG) NoH) NoI) NoJ) NoK) No5 - Yes6 - Yes7 - No8 - No</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-rxmd.sgm4~4g8p" _uuid="00000000-0000-0000-3E07-418202A87D5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rxmd.sgm4~4g8p"><intent_id>1042752</intent_id><project_id>910947</project_id><text_data>From: Ziegert, Charles O (LNI) &amp;lt;ziec235@LNI.WA.GOV&amp;gt;  Sent: Friday, March 20, 2020 7:44 AM To: bill@earthcorps.org Subject: Intent 1042752 On-Call ContractOn-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates. The use of on-�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.Thank you,Chuck ZiegertIndustrial Relations SpecialistCharles.Ziegert@lni.wa.govPrevailing WageDept of Labor and IndustriesPhone 360 902-4538Prevailing Wage 360 902-5335**Answers contained in this e-mail are based on the facts you provided. If the facts differ from those you provided, the answers may be different.**</text_data><comment_date>2020-03-20T00:00:00</comment_date></row><row _id="row-ar9r~95em-3cxs" _uuid="00000000-0000-0000-CDA3-9BF4130FC473" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ar9r~95em-3cxs"><intent_id>1419039</intent_id><project_id>1120086</project_id><text_data>9939665</text_data><comment_date>2024-04-13T00:00:00</comment_date></row><row _id="row-ekbi~4e82-pp4h" _uuid="00000000-0000-0000-C6F7-665BABA605BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ekbi~4e82-pp4h"><intent_id>1248448</intent_id><project_id>1016900</project_id><text_data>Lakeside job# 0822069trucks - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2022-07-12T00:00:00</comment_date></row><row _id="row-azas~tfnj_9ywk" _uuid="00000000-0000-0000-D743-735191A123C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-azas~tfnj_9ywk"><intent_id>481025</intent_id><project_id>633064</project_id><text_data>General laborer- clean up, deliver tools, go get supplies</text_data><comment_date>2011-10-19T00:00:00</comment_date></row><row _id="row-6ej5.tihq-w7jr" _uuid="00000000-0000-0000-3427-F184C7A158ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ej5.tihq-w7jr"><intent_id>1163904</intent_id><project_id>972491</project_id><text_data>Apply pre and post vegetation control to inlets and overflow of retention pond.Brush cut down unwanted vegetation within chain link section of bio-retention pond.Equipment: Backpack sprayer, Tractor with brush cutter attachment, hand held line trimmers, backpack blowers</text_data><comment_date>2021-07-27T00:00:00</comment_date></row><row _id="row-mpf2.cud4.pxqv" _uuid="00000000-0000-0000-EEB0-CFECC0D45960" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpf2.cud4.pxqv"><intent_id>490409</intent_id><project_id>678695</project_id><text_data>Weatherization on a mobile home.</text_data><comment_date>2011-11-21T00:00:00</comment_date></row><row _id="row-myt5-gka4-encn" _uuid="00000000-0000-0000-F55E-077E281FA51E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-myt5-gka4-encn"><intent_id>882527</intent_id><project_id>841046</project_id><text_data>Pamela Schaff is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing a new gas furnace and a new bathroom fan. This job meets the residential job requirements.</text_data><comment_date>2018-01-09T00:00:00</comment_date></row><row _id="row-edvb~nxkh-veij" _uuid="00000000-0000-0000-F55F-2F1F40B24E0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-edvb~nxkh-veij"><intent_id>1207920</intent_id><project_id>997368</project_id><text_data>This project is additional work needed to install telecommunications cable</text_data><comment_date>2022-03-09T00:00:00</comment_date></row><row _id="row-b375_ief3-h87f" _uuid="00000000-0000-0000-26F8-041202944D92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b375_ief3-h87f"><intent_id>705041</intent_id><project_id>766513</project_id><text_data>LONGMJ</text_data><comment_date>2015-07-02T00:00:00</comment_date></row><row _id="row-asej~v48q.5dhh" _uuid="00000000-0000-0000-ECE3-3544BA1C2659" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-asej~v48q.5dhh"><intent_id>529468</intent_id><project_id>694202</project_id><text_data>Install 4' high paver block wall and pavers on steps to access fish viewing platform at city park.</text_data><comment_date>2012-08-20T00:00:00</comment_date></row><row _id="row-gxfk~r4e4_d876" _uuid="00000000-0000-0000-E566-5E9E1B897F07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gxfk~r4e4_d876"><intent_id>1192942</intent_id><project_id>957574</project_id><text_data>Job# 04135S</text_data><comment_date>2021-11-12T00:00:00</comment_date></row><row _id="row-58v6.4tvw-knnm" _uuid="00000000-0000-0000-EE4A-53F0425EC4BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-58v6.4tvw-knnm"><intent_id>643135</intent_id><project_id>722690</project_id><text_data>The project is for the installation of signal light at Portal and Birch Bay Lynden Road and roadside restoration.  Matia Contractors will be providing landscaping installation for this project which includes Hydroseeding, soil amendment and planting.  We will install 3-5 inches of new topsoil in the planting areas using equipment for moving material to location.  In addition we will provide 3&amp;quot; of bark mulch around each newly installed plant.  There is no irrigation or drainage included in the Matia contract for this project.</text_data><comment_date>2014-07-23T00:00:00</comment_date></row><row _id="row-ttd6-5jnh_j8bx" _uuid="00000000-0000-0000-2066-20E56E19707C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ttd6-5jnh_j8bx"><intent_id>472163</intent_id><project_id>672300</project_id><text_data>This is an additional Intent as per Correction Notice on Intent ID # 467661Scope of WorkB. Showalter Middle School (MS):5. Removal of existing shrubs and ground cover on both sides of western entry drive.Providing irrigation, lawn, shrubs, and new guardrail as indicated.6. Removal of existing shrubs at end of parking lot �bay, providing concrete aroundexisting FDC, and providing lawn and irrigation.7. Removal of existing planting, rerouting mainline, providing new irrigation and plantingas indicated at the westerner building entry.8. East Parking Lot: Remove existing plants and soils; removal of lower branches ofPine tree; providing gravel surfacing with fabric and edging; providing irrigation;providing soil amendments and imported blended topsoil; providing new plants andlawn; and relocating existing picnic table.**Installation of Guardrail--Work was not performed.</text_data><comment_date>2011-08-15T00:00:00</comment_date></row><row _id="row-6ixz~vwsh-dmhh" _uuid="00000000-0000-0000-51C1-61F38707B6E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ixz~vwsh-dmhh"><intent_id>1000505</intent_id><project_id>890629</project_id><text_data>1. Repairs to residential structures. 2. Yes 3. 1 4. A-No, B-No, C-Yes, D-No, E-No, F-No, G-No, H-No, I-No, J-No, K-No, I-No 5. Yes 6. Yes7. No 8. No</text_data><comment_date>2019-08-19T00:00:00</comment_date></row><row _id="row-xyaa.56j6-9dvs" _uuid="00000000-0000-0000-3B9C-13F7A3927448" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xyaa.56j6-9dvs"><intent_id>545379</intent_id><project_id>700064</project_id><text_data>Job # 917503</text_data><comment_date>2012-11-20T00:00:00</comment_date></row><row _id="row-bdri-6rp6.fnw6" _uuid="00000000-0000-0000-E5B7-E28661CEA7DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bdri-6rp6.fnw6"><intent_id>527133</intent_id><project_id>693356</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2012-08-08T00:00:00</comment_date></row><row _id="row-jei2.me7b-ieet" _uuid="00000000-0000-0000-105B-8A4978B78636" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jei2.me7b-ieet"><intent_id>685092</intent_id><project_id>758195</project_id><text_data>1. install a ductless heat pump 2. single 3. one 4. a no b no c yes d. no e. no f. no g. no h. no I. no J. no k. no 6. no 7. no. 8. no</text_data><comment_date>2015-03-23T00:00:00</comment_date></row><row _id="row-kk55.wgxb_t8j6" _uuid="00000000-0000-0000-D1D1-F03FEC186E36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kk55.wgxb_t8j6"><intent_id>834929</intent_id><project_id>815907</project_id><text_data>Job #111921-001</text_data><comment_date>2017-05-18T00:00:00</comment_date></row><row _id="row-gfeh-cxtj-p9w2" _uuid="00000000-0000-0000-A9DF-DD20838CCC37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfeh-cxtj-p9w2"><intent_id>1000367</intent_id><project_id>851329</project_id><text_data>Will use planting laborers and sprinkler installers to complete the install of plants and automatic sprinkler system</text_data><comment_date>2019-08-16T00:00:00</comment_date></row><row _id="row-ck9k.37by-wpyr" _uuid="00000000-0000-0000-3E4B-125E30ECB24A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ck9k.37by-wpyr"><intent_id>988910</intent_id><project_id>878466</project_id><text_data>Bid Package #138747-OS; Access Road</text_data><comment_date>2019-07-01T00:00:00</comment_date></row><row _id="row-3enh_jpns.2az5" _uuid="00000000-0000-0000-F911-F67A1AFEA0B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3enh_jpns.2az5"><intent_id>1465823</intent_id><project_id>1119629</project_id><text_data>Provide grading, striping, and rework of multiple parking lots to ensure ADA Compliance and installation of new ADA stalls.</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-k6ni~stz8.agy2" _uuid="00000000-0000-0000-2729-40A7EA49F714" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k6ni~stz8.agy2"><intent_id>1469283</intent_id><project_id>1146421</project_id><text_data>9953889</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-rx8s_kgi4_a3gg" _uuid="00000000-0000-0000-849C-7BF8BDCDC34A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rx8s_kgi4_a3gg"><intent_id>1469066</intent_id><project_id>1146322</project_id><text_data>MMFS - 73246926</text_data><comment_date>2024-09-21T00:00:00</comment_date></row><row _id="row-wtzk_9n54.iawh" _uuid="00000000-0000-0000-18A7-A7543BB9839C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wtzk_9n54.iawh"><intent_id>1465820</intent_id><project_id>1137926</project_id><text_data>24-109</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-csj8_hx97_9et9" _uuid="00000000-0000-0000-5E78-F764724CE952" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-csj8_hx97_9et9"><intent_id>546681</intent_id><project_id>700653</project_id><text_data>From: Yvonne Nutting [mailto:yvonnen@McKinstry.com] Sent: Wednesday, January 30, 2013 8:16 AMTo: Herman, Laura E (LNI)Cc: Trudy Wright; Cheri SchnorrSubject: Intent # 546681Laura, Please add a note to our Intent # 546681 explaining that this is an on-call contract that will have multiple Affidavits for those on-call projects. Each Affidavit we file will have a note with the specific project identity.If you have any questions please feel free to contact me via email.Thank you!Yvonne Nutting | McKinstry | Contracts AdministratorPh 206-832-8431 | F 206-658-1873 | yvonnen@mckinstry.com FOR THE LIFE OF YOUR BUILDING</text_data><comment_date>2013-01-30T00:00:00</comment_date></row><row _id="row-wmca_jxyr-3ehw" _uuid="00000000-0000-0000-73CC-814B95B37086" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wmca_jxyr-3ehw"><intent_id>900930</intent_id><project_id>832284</project_id><text_data>Other Truck- lowboy/lowbed heavy duty trailer Other Truck- Water Truck</text_data><comment_date>2018-04-26T00:00:00</comment_date></row><row _id="row-2h4n~yhqb~27dz" _uuid="00000000-0000-0000-5F61-BBF55726672F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2h4n~yhqb~27dz"><intent_id>837830</intent_id><project_id>823297</project_id><text_data>GENERAL LABORERS USE HAND TOOLS SUCH AS SHOVELS AND RAKE AND DO MANUAL TASKS SUCH AS INSTALLING SILT FENCE AND HAY. OTHER TRUCKS INCLUDE LOWBOY AND/OR WATERTRUCKS.</text_data><comment_date>2017-06-02T00:00:00</comment_date></row><row _id="row-pi3y-mz3s-wvx6" _uuid="00000000-0000-0000-31FA-BF596A398C0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pi3y-mz3s-wvx6"><intent_id>513313</intent_id><project_id>688178</project_id><text_data>1. APARTMENT2. 2 STORIES 3. a) YES b) NO c) NO d) NO e) NO f) NO4. YES5. YES6. YES7. NO</text_data><comment_date>2012-05-23T00:00:00</comment_date></row><row _id="row-yjw3.yutx~en9n" _uuid="00000000-0000-0000-D608-7EC8E8ACB0B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yjw3.yutx~en9n"><intent_id>597938</intent_id><project_id>715047</project_id><text_data>Finals seeding of grass area with a 75 hp Bowie Hydroseeder</text_data><comment_date>2013-10-07T00:00:00</comment_date></row><row _id="row-b2vh_49ks~y74d" _uuid="00000000-0000-0000-B17B-DBA1C187A1A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b2vh_49ks~y74d"><intent_id>843974</intent_id><project_id>825738</project_id><text_data>We deliver and spread product for dust control via spread truck and trailer for delivery.  Commercial Truck Service will deliver and spread the dust control via spread truck and trailer for delivery.</text_data><comment_date>2017-06-28T00:00:00</comment_date></row><row _id="row-4fcu.fdhq~82e3" _uuid="00000000-0000-0000-45F9-DD71500BA220" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4fcu.fdhq~82e3"><intent_id>982907</intent_id><project_id>874582</project_id><text_data>From: Kistler, Megan (LNI) &amp;lt;eatm235@LNI.WA.GOV&amp;gt; Sent: Tuesday, June 11, 2019 2:22 PMTo: Carone, Joseph (LNI) &amp;lt;cajs235@LNI.WA.GOV&amp;gt;Subject: RE: Correction NoticeThe on-site collection and density testing IS covered work. The form needs to be mailed back to the customer. The off-site lab work is not covered.Thanks,Megan KistlerCustomer Service Specialist 2Department of Labor &amp; IndustriesPrevailing Wage ProgramPO Box 44540Olympia, WA 98504-4540(360) 902-5309Fax (360) 902-5300Megan.Kistler@lni.wa.gov****Prevailing wage is fact specific. If the facts change, the answer could change.****From: Carone, Joseph (LNI) &amp;lt;cajs235@LNI.WA.GOV&amp;gt; Sent: Tuesday, June 11, 2019 8:19 AMTo: Kistler, Megan (LNI) &amp;lt;eatm235@LNI.WA.GOV&amp;gt;Subject: FW: Correction NoticeUpdated exemption questions for I 982907Joseph CaroneCustomer Service Specialist 2360-902-5335Joseph.Carone@lni.wa.gov*** Prevailing wage issues are fact specific.  Responses depend on the accuracy and scope of your provided context. ****State of WashingtonDepartment of Labor and IndustriesPrevailing Wage ProgramPO Box 44540Olympia, WA 98504-4540</text_data><comment_date>2019-06-11T00:00:00</comment_date></row><row _id="row-ty7b~ke6x~7qaj" _uuid="00000000-0000-0000-3DE9-DE34EE0971F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ty7b~ke6x~7qaj"><intent_id>641297</intent_id><project_id>735313</project_id><text_data>Thank you for your notes. In order to finish processing your form: (A) Please describe the whole project- not just your part. Answer: This is a school remodel.B) Please describe your part(s) of the project. Answer: We have been hired to verify and adjust performance of HVAC systems after installation of new systems.Systems(C) Please specifically describe what your General Laborer will be using the cordless drill on/for in regards to this project. General Labor will be gathering nameplate data off of HVAC systems and drilling 3/8&amp;quot; test ports in order to test air pressures.</text_data><comment_date>2014-07-28T00:00:00</comment_date></row><row _id="row-c4nu-gbm4_9w97" _uuid="00000000-0000-0000-B12F-FEFF47B78067" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c4nu-gbm4_9w97"><intent_id>934603</intent_id><project_id>862104</project_id><text_data>DEI Job D004815</text_data><comment_date>2018-09-21T00:00:00</comment_date></row><row _id="row-saij.2esf~x7e3" _uuid="00000000-0000-0000-D080-00B58114C5A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-saij.2esf~x7e3"><intent_id>637395</intent_id><project_id>736872</project_id><text_data>Sweeping on NE 219th St between NE 22nd Ave and NE 102nd Ave</text_data><comment_date>2014-06-25T00:00:00</comment_date></row><row _id="row-8r74_3di2-ngay" _uuid="00000000-0000-0000-3F62-81E38E085AA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8r74_3di2-ngay"><intent_id>883734</intent_id><project_id>841616</project_id><text_data>Clean confined space areaMotor Patrol Grader to vacuum all contaminated liquidsHaz Waste workers to clear area of all debris using rakes/shovels</text_data><comment_date>2018-01-17T00:00:00</comment_date></row><row _id="row-pgkn~757z.gjhs" _uuid="00000000-0000-0000-605F-3449BF663E0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pgkn~757z.gjhs"><intent_id>503923</intent_id><project_id>674425</project_id><text_data>Beautification of area adjacent to river through the installation of trees, shrubs, organic mulch &amp; grass.Equip: Mini excavator 40 HP (under the 90 hp threshold for landscape equipment) hydroseeder, hand tools</text_data><comment_date>2012-03-14T00:00:00</comment_date></row><row _id="row-udm9~bp85-56uv" _uuid="00000000-0000-0000-2E7E-912EF3949ACE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-udm9~bp85-56uv"><intent_id>623832</intent_id><project_id>732567</project_id><text_data>Installed 6 new data drops and relocate 3 existing drops.  Install patch panel. Label and test.</text_data><comment_date>2014-04-08T00:00:00</comment_date></row><row _id="row-ufqr~6pi4~w9a3" _uuid="00000000-0000-0000-4C76-A82B0B7E3877" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ufqr~6pi4~w9a3"><intent_id>1160284</intent_id><project_id>970654</project_id><text_data>Project# 03262, Safford, Jo Ann, 4611 E Eloika Rd, Chattaroy, WA 99003</text_data><comment_date>2021-07-29T00:00:00</comment_date></row><row _id="row-jg29~s2bx~s3ed" _uuid="00000000-0000-0000-CA3A-ABEB73644ABF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jg29~s2bx~s3ed"><intent_id>520821</intent_id><project_id>661082</project_id><text_data>Laborers - Push Scaffolding, sweep and stock materialsH&amp;W 5.00, Pension 3.60, Appr. .45, LECET .070 = $9.12H&amp;W 6.63, Pension 6.75, Appr. .75, INADV .25 = $14.38</text_data><comment_date>2012-07-06T00:00:00</comment_date></row><row _id="row-63eu_m9zp~tv6r" _uuid="00000000-0000-0000-B732-FEA371CB88E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-63eu_m9zp~tv6r"><intent_id>862459</intent_id><project_id>832497</project_id><text_data>Per the Awarding Agency, this contract is strictly for the waxing of floors and carpet shampooing necessary to clean floors due to normal, every day use.  This contract would entail the use of Building Service Employees (WAC 296-127-01308) under Shampooers and Waxers.  This is NOT the work of a Janitor.</text_data><comment_date>2017-09-13T00:00:00</comment_date></row><row _id="row-dum8-fv3u_yfn4" _uuid="00000000-0000-0000-F0A7-970130D21257" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dum8-fv3u_yfn4"><intent_id>1207800</intent_id><project_id>997293</project_id><text_data>sr51412426</text_data><comment_date>2022-01-28T00:00:00</comment_date></row><row _id="row-fdmr~ri2s~rch3" _uuid="00000000-0000-0000-4139-F8830A3F881D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fdmr~ri2s~rch3"><intent_id>1318489</intent_id><project_id>1062561</project_id><text_data>Medical Ins 2.74. Vacation 3.10. Holiday 2.45. Pension 13.00 (81.61+21.29)Medical Ins 6.14. Vacation 3.05. Holiday 2.41. Pension 11.05 (80.25+22.65)</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-hxxg-4nyw~gqen" _uuid="00000000-0000-0000-097B-13EFD2EE1CF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxxg-4nyw~gqen"><intent_id>967813</intent_id><project_id>870103</project_id><text_data>Swift802 North 40th Avenue # 46Yakima, WA 98906</text_data><comment_date>2019-03-27T00:00:00</comment_date></row><row _id="row-pzm8.qh7m~qnyw" _uuid="00000000-0000-0000-A722-E651D5D7E8CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pzm8.qh7m~qnyw"><intent_id>633680</intent_id><project_id>735527</project_id><text_data>Installing soil and plant material.</text_data><comment_date>2014-06-06T00:00:00</comment_date></row><row _id="row-27m8.kd3g_ek8w" _uuid="00000000-0000-0000-F83D-79B1E8C597A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-27m8.kd3g_ek8w"><intent_id>801468</intent_id><project_id>807243</project_id><text_data>Job # 16-613</text_data><comment_date>2016-11-14T00:00:00</comment_date></row><row _id="row-4zg3.zce6_c8te" _uuid="00000000-0000-0000-42DF-9C66EF26D1B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4zg3.zce6_c8te"><intent_id>646075</intent_id><project_id>736273</project_id><text_data>&amp;quot;TRUCK DRIVER OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND OR 2000-4000 GALLON WATER TRUCK; &amp;quot;POWER EQUIPMENT OPERATOR MOTOR PATROL GRADER FINISHER&amp;quot; - NOT MOTOR PATROL, VACTOR GUZZLER/VACCON SUPER SUCKER</text_data><comment_date>2014-08-06T00:00:00</comment_date></row><row _id="row-rc9f-p3q8-2y3x" _uuid="00000000-0000-0000-A984-17FC482C9AE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rc9f-p3q8-2y3x"><intent_id>986791</intent_id><project_id>885272</project_id><text_data>TRUCK DRIVER / OTHER TRUCKS--TANKER TRUCK USED TO APPLY(SPRAY) DUST CONTROL PRODUCTS.</text_data><comment_date>2019-07-30T00:00:00</comment_date></row><row _id="row-6mqp~ypdh~9xg7" _uuid="00000000-0000-0000-76A3-8AC7E4E36831" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6mqp~ypdh~9xg7"><intent_id>824623</intent_id><project_id>817326</project_id><text_data>Clean Gasoline Spill from leaking fuel tankMotor Patrol Grader to vacuum contaminated liquidsHaz Waste worker to clear area of all debris using a shovel</text_data><comment_date>2017-04-05T00:00:00</comment_date></row><row _id="row-663p_k246.wyak" _uuid="00000000-0000-0000-10E5-220B4C1E71F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-663p_k246.wyak"><intent_id>1234027</intent_id><project_id>1007441</project_id><text_data>23759 SELAH ELC</text_data><comment_date>2022-05-17T00:00:00</comment_date></row><row _id="row-wsmu.22k7.343m" _uuid="00000000-0000-0000-589A-15DAF89C993A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wsmu.22k7.343m"><intent_id>1096460</intent_id><project_id>922255</project_id><text_data>WRI Job # 20.037</text_data><comment_date>2020-10-16T00:00:00</comment_date></row><row _id="row-sgpf.65jz-nmgd" _uuid="00000000-0000-0000-08FB-930BFAEF1739" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sgpf.65jz-nmgd"><intent_id>695797</intent_id><project_id>762821</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 5e for voice (telephone) and data (computer networking ) indoors.</text_data><comment_date>2015-05-21T00:00:00</comment_date></row><row _id="row-jbap.37n3~kt8y" _uuid="00000000-0000-0000-4B36-3B97D78E460E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jbap.37n3~kt8y"><intent_id>701970</intent_id><project_id>744957</project_id><text_data>other truck = lowboy to deliver equipment</text_data><comment_date>2015-06-19T00:00:00</comment_date></row><row _id="row-hzv4-dmd9~5umd" _uuid="00000000-0000-0000-A71E-CF02430B878C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hzv4-dmd9~5umd"><intent_id>605146</intent_id><project_id>722688</project_id><text_data>Filed by Doris Bayha</text_data><comment_date>2013-11-19T00:00:00</comment_date></row><row _id="row-vv9q_u9d5-nat8" _uuid="00000000-0000-0000-82FD-3B51C7EEBADC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vv9q_u9d5-nat8"><intent_id>741069</intent_id><project_id>777153</project_id><text_data>1.  Install Fire Sprinkler System2.  apartment3.  no basement/garage.  1 building has 1 floor and 2 buildings have 2 floors.4.  rented permanent residence  A.  no  B.  no  C.  yes  D.  no  E.  no  F.  no  G.  no  H.  no  I.  no  J.  no  K.  no5.  yes6.  yes7.  yes8.  no</text_data><comment_date>2016-01-11T00:00:00</comment_date></row><row _id="row-7p3p_eb83-6z6t" _uuid="00000000-0000-0000-A141-A5837115A02C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7p3p_eb83-6z6t"><intent_id>675662</intent_id><project_id>740252</project_id><text_data>HIRED BY SUB KELAYE CONCRETE</text_data><comment_date>2015-01-21T00:00:00</comment_date></row><row _id="row-f9nr-ux9f~n926" _uuid="00000000-0000-0000-CB38-B1A99B247D44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f9nr-ux9f~n926"><intent_id>941624</intent_id><project_id>864786</project_id><text_data>Extra Asphalt needed</text_data><comment_date>2018-10-24T00:00:00</comment_date></row><row _id="row-dm4x-895i_h9nn" _uuid="00000000-0000-0000-4508-A72A17D09332" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dm4x-895i_h9nn"><intent_id>1204106</intent_id><project_id>994854</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-07-20T00:00:00</comment_date></row><row _id="row-7mgm~zty8~8ppm" _uuid="00000000-0000-0000-ADB9-103733C3DAA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7mgm~zty8~8ppm"><intent_id>614244</intent_id><project_id>728153</project_id><text_data>OTher Trucks: Lowboy</text_data><comment_date>2014-01-29T00:00:00</comment_date></row><row _id="row-gkxt-pt22-n9j8" _uuid="00000000-0000-0000-606E-B68202518DFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gkxt-pt22-n9j8"><intent_id>456339</intent_id><project_id>620922</project_id><text_data>Cables are tested as follows:1.	The specimen (cable) to be tested is disconnected from any equipment at both ends of the equipment to prepare the cable for testing.  This is done by the IBEW electrician that is employed by the installing electrical contractor.  Generally it is this same installing electrical contractor that has hired us to do the testing.  This step would normally involve tool work.2.	The test set that is used to apply test voltage to the cable is a portable test set provided by and operated by us.3.	The cable is raised in discreet steps from zero voltage up to the voltage to be applied per the specification applicable to the test and type of cable.  For example, a 15KV cable may get tested by applying voltages stepped up from zero volts to 52,000 volts.4.	At the peak voltage, the voltage is held constant for a period of time as specified by the specification or design.  A typical time period would be 10 to 15 minutes.  The �leakage� current that naturally flows from the conductor through its insulation to ground is measured by the test set.  This data is recorded by the operator of the test set.5.	The voltage is then reduced to zero and the cable is allowed to discharge at its own pace through the test set so that the leakage current can be measured during the discharge period.  This leakage current is recorded during the cable discharge.6.	After the above testing is done, the IBEW electrician (working for the installing electrical contractor) connects the cable back into the electrical system.  This involves tool work.Our employee performs steps two through five; this work involves no tools, no disassembly, no re-assembly, no change, modification or impact to the equipment.  The installing contractor�s electrician performs step one and six.</text_data><comment_date>2011-06-21T00:00:00</comment_date></row><row _id="row-er2s~dkb4~cnun" _uuid="00000000-0000-0000-24F1-1F0BEB3F297F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-er2s~dkb4~cnun"><intent_id>925314</intent_id><project_id>858600</project_id><text_data>Job #115997-001</text_data><comment_date>2018-08-14T00:00:00</comment_date></row><row _id="row-95kr_yn2q-ni6a" _uuid="00000000-0000-0000-3A00-9CF2E0C2F160" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-95kr_yn2q-ni6a"><intent_id>972220</intent_id><project_id>811949</project_id><text_data>Cascade Bridge LLC is filing on behalf of Driving Force Decks Int&amp;#39;l Ltd due to failure to file.</text_data><comment_date>2019-04-17T00:00:00</comment_date></row><row _id="row-93a4-gdea.v3dq" _uuid="00000000-0000-0000-ED7D-86855491B482" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-93a4-gdea.v3dq"><intent_id>1049575</intent_id><project_id>914718</project_id><text_data>Job #33321-1</text_data><comment_date>2020-04-03T00:00:00</comment_date></row><row _id="row-9may-3ghr_37sc" _uuid="00000000-0000-0000-DAD9-E274BB415227" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9may-3ghr_37sc"><intent_id>1228144</intent_id><project_id>972451</project_id><text_data>Motor Patrol Grader = Vac Truck Operator</text_data><comment_date>2022-04-25T00:00:00</comment_date></row><row _id="row-jgae~i5nb.3qan" _uuid="00000000-0000-0000-6463-D917F79212C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgae~i5nb.3qan"><intent_id>922566</intent_id><project_id>857559</project_id><text_data>Needed to change info on Affidavit so had to create new Intent to do so.</text_data><comment_date>2018-08-01T00:00:00</comment_date></row><row _id="row-jteq-kqbf~9wsr" _uuid="00000000-0000-0000-E09D-9512050670CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jteq-kqbf~9wsr"><intent_id>560044</intent_id><project_id>683758</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) will perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-07-05T00:00:00</comment_date></row><row _id="row-dyhf~tf9k-5hbe" _uuid="00000000-0000-0000-D456-FBAE85108423" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dyhf~tf9k-5hbe"><intent_id>933065</intent_id><project_id>858105</project_id><text_data>Filed by Jess McDonald</text_data><comment_date>2018-09-14T00:00:00</comment_date></row><row _id="row-ymfy-rmgi-q9kz" _uuid="00000000-0000-0000-7402-2F0262C25B0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ymfy-rmgi-q9kz"><intent_id>543792</intent_id><project_id>688206</project_id><text_data>It appears your company may not be properly calculating worker fringe benefits. By separate email we have sent you a document that explains the benefits calculation process acceptable to the department. Please review that document and adjust your procedures as necessary. Approval of this form does not constitute approval of the methodology your company is using in determining the amount of such contributions. We reserve the right to investigate further the issue on this and future forms that your company submits on which the benefits calculation appears erroneous. If you have questions, please contact Marcus Ehrlander at (360) 902-5334 or marcus.ehrlander@Lni.wa.gov.</text_data><comment_date>2012-12-11T00:00:00</comment_date></row><row _id="row-tw97-f28n-dvsz" _uuid="00000000-0000-0000-6028-12FCF37776D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tw97-f28n-dvsz"><intent_id>823512</intent_id><project_id>816836</project_id><text_data>000186-846-01</text_data><comment_date>2017-03-29T00:00:00</comment_date></row><row _id="row-zxt6_ggma~69j9" _uuid="00000000-0000-0000-BB47-7777BF2AC48E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxt6_ggma~69j9"><intent_id>1229815</intent_id><project_id>1010970</project_id><text_data>job: Klieman#1 - heat pump maintenance #2 - single family dwelling #3 - 1 #4 - residence (a) no c) yes (d)no (e) no (f) no (g)no (h)no (i) no (j) no (k) no #5 - yes #6 - yes #7 - no #8 - no</text_data><comment_date>2022-04-29T00:00:00</comment_date></row><row _id="row-wmvy-mzav-cs57" _uuid="00000000-0000-0000-CB1C-41F9FA69E6BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wmvy-mzav-cs57"><intent_id>1195576</intent_id><project_id>981332</project_id><text_data>TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2021-12-13T00:00:00</comment_date></row><row _id="row-kevu.gfyw.ii42" _uuid="00000000-0000-0000-55B2-011AA455E133" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kevu.gfyw.ii42"><intent_id>487900</intent_id><project_id>677764</project_id><text_data>The trade to be used on the notes provided are the general laborers</text_data><comment_date>2011-11-09T00:00:00</comment_date></row><row _id="row-q4b6~z9fv_7uth" _uuid="00000000-0000-0000-8ED2-A4FD7FE26E87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q4b6~z9fv_7uth"><intent_id>1175458</intent_id><project_id>972949</project_id><text_data>WRS Job #P21-455PW6</text_data><comment_date>2021-09-07T00:00:00</comment_date></row><row _id="row-a6rt.r3wd.nwif" _uuid="00000000-0000-0000-05A9-6028786986F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a6rt.r3wd.nwif"><intent_id>1150471</intent_id><project_id>961775</project_id><text_data>21-1010</text_data><comment_date>2021-06-08T00:00:00</comment_date></row><row _id="row-sa3f~mbqy.qd6i" _uuid="00000000-0000-0000-AAFE-B84D31F99326" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sa3f~mbqy.qd6i"><intent_id>581420</intent_id><project_id>709417</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2013-07-16T00:00:00</comment_date></row><row _id="row-2db5~t4fq_6mr9" _uuid="00000000-0000-0000-469C-4810B473E66B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2db5~t4fq_6mr9"><intent_id>892741</intent_id><project_id>845779</project_id><text_data>Journey Level Trades &amp; Occupations- Questions:1- Hired for fire damage repair2- The structure is an apartment building3- The apartment has two levels4a- No4b- No4c- Yes4d- No4e- No4f- No4g- No4h- No4i- No4j- No4k- No5- Yes6- Yes7- Yes8- No</text_data><comment_date>2018-03-14T00:00:00</comment_date></row><row _id="row-dz2e.djbx_t8ay" _uuid="00000000-0000-0000-EF1C-5F9C874F24F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dz2e.djbx_t8ay"><intent_id>1030707</intent_id><project_id>874900</project_id><text_data>This project is exempt from the payment of state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101.</text_data><comment_date>2020-02-04T00:00:00</comment_date></row><row _id="row-9eb8.dsyi~jmsy" _uuid="00000000-0000-0000-9A58-BF1D9117ED36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9eb8.dsyi~jmsy"><intent_id>1244819</intent_id><project_id>963626</project_id><text_data>I have completed the Prevailing Wage Training.</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-zst8_bz88~keii" _uuid="00000000-0000-0000-FDB7-A7FC3FF37D9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zst8_bz88~keii"><intent_id>943277</intent_id><project_id>864968</project_id><text_data>PN # 58196 SEA</text_data><comment_date>2018-11-01T00:00:00</comment_date></row><row _id="row-86jd_jzpi.5dqu" _uuid="00000000-0000-0000-F0ED-75E6E35A9008" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-86jd_jzpi.5dqu"><intent_id>645447</intent_id><project_id>740904</project_id><text_data>Form filed by: Michael HummelExemption Intent Questionnaire form � Kentlake High School � Trouble ShootingPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1. What is the specific purpose of this awarding agency's public works project? Update the security alarm system and access controls for all Kent School District school and administrative buildings. 2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No3. Does this project entail the remodeling or new construction of a facility? No4. If your firm is working upon a type of building system, what type of system is involved? Burglar alarm system.5. What specific tasks did your employees perform? Siemens' SES Technicians, perform their work strictly on laptop computers, both remotely and on-site during the commissioning process. While off-site, the SES Technicians update program configurations and point inputs. The SES Technician typically sits in at control panel and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the system is operating properly, the SES Technician trains the end-user about system functionality, again using a computer interface. Importantly, SES Technicians do not use trade tools, such as drills or wrenches.6. What, if any, tools did your employees use in the performance of those tasks? Laptop computer.7. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No - None.8. Are you going to be hiring any subcontractors for this project? Yes.***********************To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2014-08-04T00:00:00</comment_date></row><row _id="row-vhbn_79jb~5zxk" _uuid="00000000-0000-0000-F1DF-3CAE62C6A2E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vhbn_79jb~5zxk"><intent_id>1218881</intent_id><project_id>1004309</project_id><text_data>Truck Driver - Other = Freightliner to haul modular</text_data><comment_date>2022-03-18T00:00:00</comment_date></row><row _id="row-xe2m.fdg5~9az4" _uuid="00000000-0000-0000-EFF3-6FF84AEB7B4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xe2m.fdg5~9az4"><intent_id>1178712</intent_id><project_id>977046</project_id><text_data>we are the driver/owner/operator, we have no employees</text_data><comment_date>2021-09-19T00:00:00</comment_date></row><row _id="row-8znq-xzku.fjvc" _uuid="00000000-0000-0000-1864-43869970C296" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8znq-xzku.fjvc"><intent_id>887013</intent_id><project_id>842945</project_id><text_data>Fringe Benefits:$10.94 H&amp;W &amp; PTO$5.51 Pension$2.00 IAP$0.12 Occ. Haz$1.15 Apprentice, LMCT &amp; Industry Fund______$19.72</text_data><comment_date>2018-02-07T00:00:00</comment_date></row><row _id="row-ixfq.my7v-yjvh" _uuid="00000000-0000-0000-9C5E-0F8895A1170A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ixfq.my7v-yjvh"><intent_id>923249</intent_id><project_id>852517</project_id><text_data>Construction Survey Staking</text_data><comment_date>2018-08-03T00:00:00</comment_date></row><row _id="row-aq5z.cz78~cpyn" _uuid="00000000-0000-0000-59AD-1A355D047A64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aq5z.cz78~cpyn"><intent_id>1097419</intent_id><project_id>929906</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project?   Central Plant Valve Replacement       2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No        3. Does this project entail the remodeling or new construction of a facility?    No.     4. If your firm is working upon a type of building system, what type of system is involved?  HVAC Controls     5. When is your Work to be completed?     During the project    6. What specific tasks did your employees perform?     Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.        7. What, if any, tools did your employees use in the performance of those tasks?     Laptop computer.      8. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks?    No      9. Are you going to be hiring any subcontractors for this project?     No</text_data><comment_date>2020-10-20T00:00:00</comment_date></row><row _id="row-d88s.8v9i-fy6b" _uuid="00000000-0000-0000-FA3F-E1DE39AFF739" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d88s.8v9i-fy6b"><intent_id>1088244</intent_id><project_id>932723</project_id><text_data>1520261</text_data><comment_date>2020-09-15T00:00:00</comment_date></row><row _id="row-axxi_cfww~yjrq" _uuid="00000000-0000-0000-B54B-C9BBFA3F8D41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-axxi_cfww~yjrq"><intent_id>657048</intent_id><project_id>745336</project_id><text_data>Form filed by: Mark Frister</text_data><comment_date>2014-09-26T00:00:00</comment_date></row><row _id="row-9qv5~k2cw_eeb6" _uuid="00000000-0000-0000-66DC-5FFB3ED3006D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9qv5~k2cw_eeb6"><intent_id>924903</intent_id><project_id>781506</project_id><text_data>Filed by Tina Christie2019 Peterbilt 367 Tractor w/ 2016 60 ton pacesetter Lowboy Trailer</text_data><comment_date>2018-08-10T00:00:00</comment_date></row><row _id="row-qvif~nm9u-2rph" _uuid="00000000-0000-0000-400E-C339D35B32FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qvif~nm9u-2rph"><intent_id>450129</intent_id><project_id>663160</project_id><text_data>Industrial Insurance Account Id: 208,043-00</text_data><comment_date>2011-04-13T00:00:00</comment_date></row><row _id="row-dgfj-n7d3~dw9u" _uuid="00000000-0000-0000-D8CC-E1665A2F5E9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgfj-n7d3~dw9u"><intent_id>1244235</intent_id><project_id>1019366</project_id><text_data>PO# 829796</text_data><comment_date>2022-06-26T00:00:00</comment_date></row><row _id="row-i83z.vsbk~ettx" _uuid="00000000-0000-0000-AAAF-96B92DFED519" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i83z.vsbk~ettx"><intent_id>912980</intent_id><project_id>853990</project_id><text_data>600737</text_data><comment_date>2018-06-21T00:00:00</comment_date></row><row _id="row-9psp-9jgs_s3qe" _uuid="00000000-0000-0000-FFE1-CC226E167DD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9psp-9jgs_s3qe"><intent_id>830222</intent_id><project_id>819218</project_id><text_data>Job # 16269</text_data><comment_date>2017-05-02T00:00:00</comment_date></row><row _id="row-3u32~59yq-gxrr" _uuid="00000000-0000-0000-6845-2992865F37AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3u32~59yq-gxrr"><intent_id>1088190</intent_id><project_id>932698</project_id><comment_date>2020-09-15T00:00:00</comment_date></row><row _id="row-tpdj.sti3.vumc" _uuid="00000000-0000-0000-806F-CE8E8B1B140B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tpdj.sti3.vumc"><intent_id>881080</intent_id><project_id>840344</project_id><text_data>#1 - Residential construction on a house. #2 - Single family dwelling. #3 - 1 story. #4 - Rehabilitation house? No. Transitional housing? No. Communal dining facility? No. Treatment services? No. Dormitories? No. Counseling? No. Is each room and/or bed in the structure rented separately? No. Other? No. #5 - Yes. #6 - Yes. #7 - No. #8 - No.</text_data><comment_date>2017-12-28T00:00:00</comment_date></row><row _id="row-734n_k86n.4qpw" _uuid="00000000-0000-0000-3B23-3B8966DF4B9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-734n_k86n.4qpw"><intent_id>800583</intent_id><project_id>804784</project_id><text_data>OTHER TRUCKS - WATER TANK TRUCK - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH WATER OTHER TRUCKS - OIL DISTRIBUTOR DRIVER - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH OIL/TACK PRIOR TO PLACING ASPHALT</text_data><comment_date>2016-11-09T00:00:00</comment_date></row><row _id="row-dhhc_6pm8_iybc" _uuid="00000000-0000-0000-1CCE-FBC3F307D47A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dhhc_6pm8_iybc"><intent_id>1208587</intent_id><project_id>997761</project_id><text_data>1.Weatherization 2. single family 3. 1 4. Aa0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2022-02-02T00:00:00</comment_date></row><row _id="row-vj3r_wgep-8x3y" _uuid="00000000-0000-0000-09FD-EAB2DAEE27B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vj3r_wgep-8x3y"><intent_id>758075</intent_id><project_id>783891</project_id><text_data>Truck is a 3000 gal truck mounted hydroseeder</text_data><comment_date>2016-04-22T00:00:00</comment_date></row><row _id="row-3pwh_pvqq.kj6r" _uuid="00000000-0000-0000-3814-3AC309A04490" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3pwh_pvqq.kj6r"><intent_id>504128</intent_id><project_id>684335</project_id><text_data>BASE RATE: $44.67VAC: $4.00ASSES DUES: $1.05H&amp;W DENTAL: $8.16STATE PENS: $4.56NAT'L PENS: $2.49ITF: $.10JATC FUND: $1.38IND FUND: $.30SUPPL PENSION: $3.25</text_data><comment_date>2012-03-19T00:00:00</comment_date></row><row _id="row-3f5j~j2va_7qz5" _uuid="00000000-0000-0000-E865-BCA8C85046DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3f5j~j2va_7qz5"><intent_id>531238</intent_id><project_id>693587</project_id><text_data>Filed by Steven Carlson</text_data><comment_date>2012-08-28T00:00:00</comment_date></row><row _id="row-ap2h~e7qx.xghu" _uuid="00000000-0000-0000-7C55-894E52CD1583" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ap2h~e7qx.xghu"><intent_id>542329</intent_id><project_id>698816</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-11-19T00:00:00</comment_date></row><row _id="row-6fmp-e5jw-iemj" _uuid="00000000-0000-0000-0A41-176D4A54EAD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6fmp-e5jw-iemj"><intent_id>821343</intent_id><project_id>815892</project_id><text_data>Duties included installing containment, moved contents from affected area, cleaned contents by spraying with a sporicide and wiping excess off, moved cleaned contents into a truck, disposed of mold affected shelving which could not be cleaned, manufactured plywood shelves to replace particle board mold affected shelves.  Removed mold affected drywall and insulation from floor to ceiling, as needed, sprayed interior of walls with sporicide and wiped.  Set dehumidifier and air scrubber to run over night.  Returned to remove containment, removed debris, returned shelving and contents to the storage room.  Equipment used, two cube trucks, one dehumidifier and one air scrubber, ladders, cordless drills, small hand tools, sprayers, drywall knife to cut drywall, personal protective equipment, masks, gloves and Tyvek protective suites.</text_data><comment_date>2017-09-05T00:00:00</comment_date></row><row _id="row-2i3e-sscw~2ty4" _uuid="00000000-0000-0000-DC69-956E876645F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2i3e-sscw~2ty4"><intent_id>525116</intent_id><project_id>692612</project_id><text_data>Last Name:  KuljisFirst Name:  MarkAddress:       4015 Eliza Ave. #12BBellingham, WA 98226PO #:  35-02785</text_data><comment_date>2012-07-30T00:00:00</comment_date></row><row _id="row-mm4e~n5aa-w3s3" _uuid="00000000-0000-0000-E42F-58F9F21040A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mm4e~n5aa-w3s3"><intent_id>757591</intent_id><project_id>790001</project_id><text_data>Installed 2 Cat 5e cables for interior voice use.</text_data><comment_date>2016-04-20T00:00:00</comment_date></row><row _id="row-4msm-66rq_3eu5" _uuid="00000000-0000-0000-F5EB-1F1178D2D437" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4msm-66rq_3eu5"><intent_id>1148339</intent_id><project_id>964310</project_id><text_data>9871408</text_data><comment_date>2021-05-27T00:00:00</comment_date></row><row _id="row-m22p-gie4~rs7d" _uuid="00000000-0000-0000-812B-53D222A28DB0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m22p-gie4~rs7d"><intent_id>805423</intent_id><project_id>808572</project_id><text_data>#1 Replace bath fan. #2 Single family dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2016-12-04T00:00:00</comment_date></row><row _id="row-2amy~tgh2~cf53" _uuid="00000000-0000-0000-BA38-6A1B9099D986" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2amy~tgh2~cf53"><intent_id>1284076</intent_id><project_id>1027796</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Countertop replacement/installation#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? YES#3 - Including any basement or garage, how many stories or levels does the structure have? USUALLY ONE (SOME UNITS ARE TOWNHOMES)#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(i) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO(l) Other services or uses?#5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on site? YES#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2022-11-16T00:00:00</comment_date></row><row _id="row-ndai-b4dh-qbym" _uuid="00000000-0000-0000-F63A-670DA9B0B5EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ndai-b4dh-qbym"><intent_id>981792</intent_id><project_id>882858</project_id><text_data>From: Ziegert, Charles O (LNI) &amp;lt;ziec235@LNI.WA.GOV&amp;gt; Sent: Monday, June 10, 2019 6:21 AMTo: kelley_jeanne@hotmail.comSubject: Intent 981792 On CallGood morning,On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on--call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.aspThank you,Chuck ZiegertIndustrial Relations SpecialistCharles.Ziegert@lni.wa.govPrevailing WageDept of Labor and IndustriesPhone 360 902-4538Prevailing Wage 360 902-5335Prevailing Wage Information:http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp</text_data><comment_date>2019-06-10T00:00:00</comment_date></row><row _id="row-qcy2.xm77-ghv2" _uuid="00000000-0000-0000-86FB-8051ED1C4005" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qcy2.xm77-ghv2"><intent_id>751514</intent_id><project_id>787283</project_id><text_data>Fringe Benefits - Pension $10.86, Medical $10.75, Apprentice $.90</text_data><comment_date>2016-03-15T00:00:00</comment_date></row><row _id="row-yiui-ruk3~d9rv" _uuid="00000000-0000-0000-158C-14554138173D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yiui-ruk3~d9rv"><intent_id>476614</intent_id><project_id>669299</project_id><text_data>The general laborer sets foodservice equipment in place such as stoves, ovens, mixers, etc - there are no hook ups performed by the general laborer.</text_data><comment_date>2011-09-27T00:00:00</comment_date></row><row _id="row-u3pp_5p5n_77ng" _uuid="00000000-0000-0000-7794-087963F48E6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u3pp_5p5n_77ng"><intent_id>850220</intent_id><project_id>827698</project_id><text_data>0917092</text_data><comment_date>2017-07-26T00:00:00</comment_date></row><row _id="row-y6q5-uawi.frag" _uuid="00000000-0000-0000-A08E-E36FB6A60398" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y6q5-uawi.frag"><intent_id>964249</intent_id><project_id>817530</project_id><text_data>Our Intent #964249 paperwork mistakenly stated this project to be exempt from the payment of WA state prevailing wages based on the Housing Act of 1937 and 24 CFT 965.101, but this was an error on our part.  There is no such exemption on this project.</text_data><comment_date>2019-03-11T00:00:00</comment_date></row><row _id="row-bb8d~erz6-385u" _uuid="00000000-0000-0000-3C60-6135BB03E496" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bb8d~erz6-385u"><intent_id>1223671</intent_id><project_id>1007307</project_id><text_data>Installation of customer provided data cabling for data networks to support IP phone and desk top computers.</text_data><comment_date>2022-04-06T00:00:00</comment_date></row><row _id="row-knd7_vgv7.rbfj" _uuid="00000000-0000-0000-6E23-A6383F5806F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knd7_vgv7.rbfj"><intent_id>1155686</intent_id><project_id>968309</project_id><text_data>We are providing limited supervision on this project.  The subcontractor listed will provide detailed information regarding the scope of work.</text_data><comment_date>2021-06-25T00:00:00</comment_date></row><row _id="row-vrq3-7bb8~6ij6" _uuid="00000000-0000-0000-0BC2-ACE2782FB051" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vrq3-7bb8~6ij6"><intent_id>1173985</intent_id><project_id>971681</project_id><text_data>TRUCK:  MAKE - GMC, YEAR - 2005, MODEL - C7500, WEIGHT - 26,000USED TO DELIVER PRODUCT TO THE JOBSITE</text_data><comment_date>2021-08-31T00:00:00</comment_date></row><row _id="row-34tk-2ujz.eym9" _uuid="00000000-0000-0000-7A7E-3B72B5EEF0E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-34tk-2ujz.eym9"><intent_id>651655</intent_id><project_id>743259</project_id><text_data>#1 Bath fan, Hood fan Replacement &amp; J-boxes. #2 Single Family dwelling #3 1 story BLDG #4(a)no (b)no (c)yes (d)no (e)no (f)no (g)no (h)no (i)no (j)no(k)no #5 1 family dwelling kitchen #6 1 family dwelling bathroom #7 no places #8 no public use.</text_data><comment_date>2014-08-31T00:00:00</comment_date></row><row _id="row-xdds-m7zg_tw9n" _uuid="00000000-0000-0000-C75F-2064D3FAB069" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdds-m7zg_tw9n"><intent_id>730998</intent_id><project_id>776548</project_id><text_data>1435 Osprey Ln, College Place, WA</text_data><comment_date>2015-11-11T00:00:00</comment_date></row><row _id="row-ymys.c9ap.3yx4" _uuid="00000000-0000-0000-DBDB-B5A55DA585B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ymys.c9ap.3yx4"><intent_id>690755</intent_id><project_id>757981</project_id><text_data>Form filed by:  Angela Olson</text_data><comment_date>2015-04-23T00:00:00</comment_date></row><row _id="row-knnn~6xj7.bzzc" _uuid="00000000-0000-0000-2C23-80D9EA9BB31D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knnn~6xj7.bzzc"><intent_id>625857</intent_id><project_id>721562</project_id><text_data>Labor Ready is a temporary labor service provider and is therefore exempt from the requirement to obtain a contractors license.</text_data><comment_date>2014-04-21T00:00:00</comment_date></row><row _id="row-f9nu_tksf.c3eg" _uuid="00000000-0000-0000-1380-377EFDC021DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f9nu_tksf.c3eg"><intent_id>777206</intent_id><project_id>797853</project_id><text_data>Installed hammer arrestor per engineers specifications. Tested, didn&amp;#39;t work. Going to write up an estimate to install a spring check instead of the swing check that&amp;#39;s installed now.</text_data><comment_date>2016-07-25T00:00:00</comment_date></row><row _id="row-sp7t.gf8i-ezu4" _uuid="00000000-0000-0000-A2B8-19DD02C64BA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sp7t.gf8i-ezu4"><intent_id>730464</intent_id><project_id>776282</project_id><text_data>WORK PERFORMED BY THE TELECOMMUNICATIONS TECHNICIANS IS INSTALLING TELECOMMUNICATIONS CABLE CATEGORY 6 FOR VOICE (TELEPHONE) AND DATA (COMPUTER NETWORKING) INDOORS.</text_data><comment_date>2015-11-06T00:00:00</comment_date></row><row _id="row-sa9i_snff_yvuy" _uuid="00000000-0000-0000-B7B9-C73F87A4BD7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sa9i_snff_yvuy"><intent_id>1063879</intent_id><project_id>919196</project_id><text_data>Miles job# 20048TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2020-06-09T00:00:00</comment_date></row><row _id="row-27yz-6cvb-82q6" _uuid="00000000-0000-0000-F4CC-C0F072B070B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-27yz-6cvb-82q6"><intent_id>1088829</intent_id><project_id>927910</project_id><text_data>Lakeside Job #0320038Element Job #51920*</text_data><comment_date>2020-09-17T00:00:00</comment_date></row><row _id="row-zk2b~siz6.6pzq" _uuid="00000000-0000-0000-1CB6-7F7E1027829C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zk2b~siz6.6pzq"><intent_id>650482</intent_id><project_id>740141</project_id><text_data>Water Truck 3,000 gallon +</text_data><comment_date>2014-08-26T00:00:00</comment_date></row><row _id="row-vkmw.tbfd_8994" _uuid="00000000-0000-0000-1856-7ABCFE0F3158" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkmw.tbfd_8994"><intent_id>1207594</intent_id><project_id>958166</project_id><text_data>Project is construction of an elementary school.  Our scope of work will to hydroseed lawn areas using a 75hp Bowie hydroseeder.</text_data><comment_date>2022-01-27T00:00:00</comment_date></row><row _id="row-gzwx.53wu.pux5" _uuid="00000000-0000-0000-74EA-67360C9F2FFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzwx.53wu.pux5"><intent_id>811066</intent_id><project_id>804901</project_id><text_data>PERSONAL			ANCIL+	TIME	HOL	PEN 	HEALTHTOTAL	PER HR	PER HR	PER HR	PER HR$5.15	$0.73	$0.66	$0.00	$3.76</text_data><comment_date>2017-01-14T00:00:00</comment_date></row><row _id="row-say9-mvc6-zcdf" _uuid="00000000-0000-0000-D32C-87C350646B35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-say9-mvc6-zcdf"><intent_id>494798</intent_id><project_id>679492</project_id><text_data>The Fringe benefit is $24.55 - The $67.56 is a total including wages, I accidentally added it as a fringe. Here's the breakdown of the Fringe benefit as requested;$3.90 Vacation$1.05 Assessment Check-off$8.16 Health &amp; Welfare &amp; Dental$4.32 WA State pension fund$2.49 National Pension Fund$0.10 International Training Fund$2.85 Supplemental Pension$0.30 Industry Improvement Trust$1.38 JATC</text_data><comment_date>2011-12-28T00:00:00</comment_date></row><row _id="row-hdkj~xgcd~hu56" _uuid="00000000-0000-0000-C280-5C57A880E092" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hdkj~xgcd~hu56"><intent_id>459550</intent_id><project_id>665681</project_id><text_data>We are an Oregon employer with temporary workers in Washington. Our Oregon Worker's Compensation policy covers all employees working in Washington.</text_data><comment_date>2011-06-08T00:00:00</comment_date></row><row _id="row-ukp5.afp5_39av" _uuid="00000000-0000-0000-E04C-53175A87E872" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ukp5.afp5_39av"><intent_id>744482</intent_id><project_id>784056</project_id><text_data>We will have one Journeyman &amp;quot;Electrician-Inside&amp;quot; who is the owner, exempt from prevailing wage.  And we will have one apprentice, who will be reported when affidavit is completed.</text_data><comment_date>2016-02-02T00:00:00</comment_date></row><row _id="row-jfiy.fvj5.879e" _uuid="00000000-0000-0000-17FA-506947B0F66F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jfiy.fvj5.879e"><intent_id>702951</intent_id><project_id>765732</project_id><text_data>Form filed by:  Patty Harriman</text_data><comment_date>2015-06-23T00:00:00</comment_date></row><row _id="row-zaxy.xfva-q6wc" _uuid="00000000-0000-0000-8C17-3AF0831A53A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zaxy.xfva-q6wc"><intent_id>1203944</intent_id><project_id>980885</project_id><text_data>Repair the siding on the exterior of the buildingunknown to us - was not open2 storiesoffices is what we saw , but everything was closed a.) unknown b.) unknown c.) unknown d.) unknown e.) unknown f.) unknown g.) unknown h.) unknown i.) unknown j.) unknown k.) unknown l.) unknownunknownunknownunknown - place was closedunknown - place was closed</text_data><comment_date>2022-01-11T00:00:00</comment_date></row><row _id="row-p78n-6g2g_qbm4" _uuid="00000000-0000-0000-82D8-2E6944490B6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p78n-6g2g_qbm4"><intent_id>579298</intent_id><project_id>686238</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) will perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-07-11T00:00:00</comment_date></row><row _id="row-ghbv.fdzq_5m9w" _uuid="00000000-0000-0000-7B08-DBD4A3436CE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ghbv.fdzq_5m9w"><intent_id>927343</intent_id><project_id>852518</project_id><text_data>HIRING CONTRACTOR:B ANDERSON CONSTRUCTION INC</text_data><comment_date>2018-08-21T00:00:00</comment_date></row><row _id="row-3ett_x8sj_sv4q" _uuid="00000000-0000-0000-2CAA-ADDC85AC308C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ett_x8sj_sv4q"><intent_id>1114308</intent_id><project_id>946050</project_id><text_data>SM-14.59 pension, 13.08 medical, 1.27 JATCP&amp;PF-15.29 pension, 9.01 medical, 2.08 JATCElec-13.41 pension, 9.70 medical, .68 JATC</text_data><comment_date>2021-01-20T00:00:00</comment_date></row><row _id="row-8b2k-k98u~js47" _uuid="00000000-0000-0000-AAD4-4EC4FF776032" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8b2k-k98u~js47"><intent_id>623031</intent_id><project_id>732196</project_id><text_data>PC 6</text_data><comment_date>2014-04-02T00:00:00</comment_date></row><row _id="row-8prn.qrsq~yk4p" _uuid="00000000-0000-0000-3BE4-FC4D9F3D1FAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8prn.qrsq~yk4p"><intent_id>718196</intent_id><project_id>764448</project_id><text_data>work to be performed will be hydroseed lawn area with a 75 hp bowie hydroseeder</text_data><comment_date>2015-09-01T00:00:00</comment_date></row><row _id="row-f5qu.vzbg-iv84" _uuid="00000000-0000-0000-E89D-60205B5BDF92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f5qu.vzbg-iv84"><intent_id>480403</intent_id><project_id>591195</project_id><text_data>We will be performing land clearing, sprinkler installation w/irrigation piping from 2&amp;quot; - 18&amp;quot;, topsoil placement max 6&amp;quot; below finish grade, mulch bark placement, plant &amp; shrub installation, seeding &amp; hydroseeding. Use of bobcat, walk-behind tiller, rakes &amp; shovels.</text_data><comment_date>2011-09-27T00:00:00</comment_date></row><row _id="row-pweb-bvsm_sdkv" _uuid="00000000-0000-0000-0F47-25BE00E210A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pweb-bvsm_sdkv"><intent_id>508042</intent_id><project_id>614171</project_id><text_data>Sent e-mail 04/06/2012: Intent and Affidavit forms submitted with a bid due date up until April 9, 2012, will be approved with the wage and fringe benefit amounts claimed by your firm if it meets or exceeds the required prevailing rate of wage. However, after that date your firm may no longer utilize the fringe benefit guidance dated May 9, 1989, in which the amount paid into the plan is divided by the total number of hours worked on the public works project. All claimed fringe benefits must be calculated on the annualized figure of 2,080 as provided in my December 22, 2011, and December 28, 2011, e-mails to your firm and workers must be compensated based upon this calculation method. Pending forms held for fringe benefit review will be approved today.To reiterate: The amount of credit that may be taken for a fringe benefit must be calculated on an annual (yearly) basis. That means that an employer determines the total amount that will be contributed for the year for the benefit such as vacation pay or holiday pay and that total contribution figure for the calendar year must be divided by 2,080 to arrive at the hourly fringe benefit credit. The employee is to receive that total contribution figure in the calendar year or upon termination of employment.</text_data><comment_date>2012-04-23T00:00:00</comment_date></row><row _id="row-84n3~3avi_zsk4" _uuid="00000000-0000-0000-A303-E1BAB18C0096" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-84n3~3avi_zsk4"><intent_id>1025134</intent_id><project_id>887550</project_id><comment_date>2019-12-05T00:00:00</comment_date></row><row _id="row-kafm_e5mx_84h2" _uuid="00000000-0000-0000-B45F-41110F7B5EE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kafm_e5mx_84h2"><intent_id>959197</intent_id><project_id>872709</project_id><text_data>Preconstruction Phase</text_data><comment_date>2019-02-06T00:00:00</comment_date></row><row _id="row-68w9-atqg-i6xw" _uuid="00000000-0000-0000-0619-7C660E359137" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-68w9-atqg-i6xw"><intent_id>809830</intent_id><project_id>810590</project_id><text_data>Clean vaultHaz Waste worker to clear area of all debris using rake/shovelMotor Patrol Grader to vacuum area of all liquidsDES Contract</text_data><comment_date>2017-01-05T00:00:00</comment_date></row><row _id="row-7prz~9j69_fr6d" _uuid="00000000-0000-0000-54EB-E04DAE934AF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7prz~9j69_fr6d"><intent_id>832328</intent_id><project_id>820466</project_id><text_data>1. Ductless Mini Split, 2. Single family, 3. 2 story 4. RESIDENCE $a - 7 NO this is a single residence</text_data><comment_date>2017-05-11T00:00:00</comment_date></row><row _id="row-ijsd~5d2p_kxfe" _uuid="00000000-0000-0000-9AF3-A2F3F41025BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijsd~5d2p_kxfe"><intent_id>1237807</intent_id><project_id>1015680</project_id><text_data>12679 2022 agreement</text_data><comment_date>2022-06-01T00:00:00</comment_date></row><row _id="row-r5kb.kka5.sk4e" _uuid="00000000-0000-0000-B8A4-C0073E11750F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5kb.kka5.sk4e"><intent_id>1016505</intent_id><project_id>896631</project_id><text_data>88070 Franklin County Corrections Blower Assembly Replacement</text_data><comment_date>2019-10-19T00:00:00</comment_date></row><row _id="row-cebz_tzjw-mqgd" _uuid="00000000-0000-0000-012B-882F90AFC1F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cebz_tzjw-mqgd"><intent_id>926147</intent_id><project_id>858909</project_id><text_data>Install Compost into landscaped areas.</text_data><comment_date>2018-08-16T00:00:00</comment_date></row><row _id="row-xwfq~a9pg~x3zq" _uuid="00000000-0000-0000-6B2C-42480691678B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xwfq~a9pg~x3zq"><intent_id>1115517</intent_id><project_id>939913</project_id><comment_date>2021-01-15T00:00:00</comment_date></row><row _id="row-a8vp-v8ns-yur4" _uuid="00000000-0000-0000-9F71-B5C095533EE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a8vp-v8ns-yur4"><intent_id>669940</intent_id><project_id>750822</project_id><text_data>Job # 9020054</text_data><comment_date>2014-12-15T00:00:00</comment_date></row><row _id="row-3br7~x5g6~2eac" _uuid="00000000-0000-0000-51BF-2FF237C195A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3br7~x5g6~2eac"><intent_id>1000390</intent_id><project_id>890582</project_id><text_data>1. Service furnace. 2. Single family dwelling. 3. Two 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2019-08-16T00:00:00</comment_date></row><row _id="row-9uzg~fmin.w3he" _uuid="00000000-0000-0000-8E01-6579FD16011F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9uzg~fmin.w3he"><intent_id>624247</intent_id><project_id>732400</project_id><text_data>60 Yard End Dump Tractor Trailer hauling brush</text_data><comment_date>2014-04-11T00:00:00</comment_date></row><row _id="row-5fec-fkpj.jjcw" _uuid="00000000-0000-0000-1241-BC95900A295F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fec-fkpj.jjcw"><intent_id>1270944</intent_id><project_id>1033328</project_id><text_data>Vegetation will be removed using gas powered hedge trimmers. Trash and debris will be picked up and bagged and disposed of. Hyrdoseed will be applied using pressure tank sprayer.</text_data><comment_date>2022-09-30T00:00:00</comment_date></row><row _id="row-ynbf-hf39~bjdf" _uuid="00000000-0000-0000-4FF5-F9131BC374B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ynbf-hf39~bjdf"><intent_id>809461</intent_id><project_id>810436</project_id><text_data>Filed by Carol McArdle.</text_data><comment_date>2017-01-03T00:00:00</comment_date></row><row _id="row-hm66-s6gj_hnit" _uuid="00000000-0000-0000-17C3-00407B2C5CEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hm66-s6gj_hnit"><intent_id>684944</intent_id><project_id>753585</project_id><text_data>Carl Armstrong 3240 Lodgepole Lane #8 Oak Harbor WA, 98277</text_data><comment_date>2015-03-22T00:00:00</comment_date></row><row _id="row-uhtd.n9kw~f9u3" _uuid="00000000-0000-0000-E7FA-64723C32632C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uhtd.n9kw~f9u3"><intent_id>576618</intent_id><project_id>710745</project_id><text_data>Fringe BreakdownLABORERS:  $10.30H &amp; W   = $5.30Pension = $4.50Training= $0.45Trust     = $0.05OPERATORS:  $12.60H &amp; W   = $5.30Pension = $6.75Training= $0.55TEAMSTERS:  $14.44H &amp; W   = $8.86Pension = $5.33Training= $0.25</text_data><comment_date>2013-06-20T00:00:00</comment_date></row><row _id="row-g83a.9nqf~ku7r" _uuid="00000000-0000-0000-8707-31A7B68F941E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g83a.9nqf~ku7r"><intent_id>630217</intent_id><project_id>735183</project_id><text_data>Job # 166598</text_data><comment_date>2014-05-18T00:00:00</comment_date></row><row _id="row-ajqh.gu6z~9sfb" _uuid="00000000-0000-0000-3269-C1E7F8515F90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ajqh.gu6z~9sfb"><intent_id>533588</intent_id><project_id>695640</project_id><text_data>1. insulation upgrades, weatherization,2 single family3=14a=n4b=n4c=y4d=n4e=n4f=n4g=n4h=n4i=n4j=n4k=na5=yes6=yes7==n8=n address= N. Reed St, Sedro-Woolley WA 98284</text_data><comment_date>2012-09-17T00:00:00</comment_date></row><row _id="row-jfex~nrx7-j2dr" _uuid="00000000-0000-0000-9E39-23116FE405BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jfex~nrx7-j2dr"><intent_id>698875</intent_id><project_id>756344</project_id><text_data>Norma Gallegos375 &amp;quot;D&amp;quot; St SW Ephrata, WA 98823</text_data><comment_date>2015-06-06T00:00:00</comment_date></row><row _id="row-pg6e-8qw4~crqn" _uuid="00000000-0000-0000-72E1-6C427C01F022" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pg6e-8qw4~crqn"><intent_id>1218964</intent_id><project_id>1004356</project_id><text_data>This is just for the 2022 contract year.</text_data><comment_date>2022-03-18T00:00:00</comment_date></row><row _id="row-vkik~2736_zcim" _uuid="00000000-0000-0000-CF5E-7AF4359512EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkik~2736_zcim"><intent_id>1004421</intent_id><project_id>886888</project_id><comment_date>2019-09-04T00:00:00</comment_date></row><row _id="row-sw9d_et4x_a4x6" _uuid="00000000-0000-0000-A259-AA61A56778B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sw9d_et4x_a4x6"><intent_id>1233032</intent_id><project_id>1012931</project_id><text_data>Owner 1 - will be using an excavator to pull up stumps and load into dump truckOwner 2 - will be driving dump truck</text_data><comment_date>2022-05-12T00:00:00</comment_date></row><row _id="row-4im6~xvuc.tg77" _uuid="00000000-0000-0000-9964-92D69754D2EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4im6~xvuc.tg77"><intent_id>1039111</intent_id><project_id>908829</project_id><text_data>D005932</text_data><comment_date>2020-02-18T00:00:00</comment_date></row><row _id="row-dhjy.p39i_hvfp" _uuid="00000000-0000-0000-43CB-696633C32BD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dhjy.p39i_hvfp"><intent_id>947659</intent_id><project_id>867315</project_id><text_data>Nautilus Rd., Freeland, WA 982491. Air seal, attic blow, duct seal, belly blow, mechanical ventilation		2. Single family		3. 1		4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No		5. Yes		6. Yes		7. No		8. No</text_data><comment_date>2018-11-27T00:00:00</comment_date></row><row _id="row-9hc6-k27z.gd6k" _uuid="00000000-0000-0000-D4ED-B6719B89B69B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9hc6-k27z.gd6k"><intent_id>1083751</intent_id><project_id>923337</project_id><text_data>1200062 - South Park Pump Station</text_data><comment_date>2020-08-27T00:00:00</comment_date></row><row _id="row-jenm_fz45~fmvk" _uuid="00000000-0000-0000-994B-50B03049A8B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jenm_fz45~fmvk"><intent_id>713431</intent_id><project_id>768386</project_id><text_data>Hour wage 38.80  Admin fund  .19Pension 7.75LMCC .10health and welfare 9.08App. training .60nebf 1.16nlmcc .01</text_data><comment_date>2015-08-11T00:00:00</comment_date></row><row _id="row-yq55-brmb.4rs4" _uuid="00000000-0000-0000-EF6C-352CCC9326B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yq55-brmb.4rs4"><intent_id>949841</intent_id><project_id>848028</project_id><text_data>this was already approved but the wrong sub was chosen. just was trying to switch out Northwest Utilities inc for NW Utility Services. please expedite if possibleTelecom Tech(09) and Elect tech(06)Inside workinstalled low voltage cablingtelephone and databits and bytes</text_data><comment_date>2018-12-10T00:00:00</comment_date></row><row _id="row-u684_n3qj~q6tq" _uuid="00000000-0000-0000-E92A-F30CEC6BB142" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u684_n3qj~q6tq"><intent_id>879212</intent_id><project_id>837037</project_id><text_data>Filed by Jean Mollenkopf Moore</text_data><comment_date>2017-12-14T00:00:00</comment_date></row><row _id="row-b3b2.k9xk_7vbs" _uuid="00000000-0000-0000-D5E8-E2FCE3D8CED6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b3b2.k9xk_7vbs"><intent_id>804146</intent_id><project_id>791441</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK &amp;quot;POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)&amp;quot; USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2016-11-23T00:00:00</comment_date></row><row _id="row-upak_ay57~p7gc" _uuid="00000000-0000-0000-FEA8-4DF5C23702FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-upak_ay57~p7gc"><intent_id>1158764</intent_id><project_id>878281</project_id><comment_date>2021-07-08T00:00:00</comment_date></row><row _id="row-gqjt-2veq-eacv" _uuid="00000000-0000-0000-7FF3-DD6E619BD225" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqjt-2veq-eacv"><intent_id>550393</intent_id><project_id>702365</project_id><text_data>Form filed by: Shellie Torrence</text_data><comment_date>2013-01-02T00:00:00</comment_date></row><row _id="row-uyfn-4g4u~i4rn" _uuid="00000000-0000-0000-FA56-2826E241434D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uyfn-4g4u~i4rn"><intent_id>746565</intent_id><project_id>785005</project_id><text_data>Materials used: mops, buckets, cleaning chemicals, moisture meters, air movers &amp; dehumidifiers.  Laborers placed drying equipment, and monitored drying progress.  Laborers also wiped down counters, and mopped floors.</text_data><comment_date>2016-02-19T00:00:00</comment_date></row><row _id="row-ht3u~xihf_rvb8" _uuid="00000000-0000-0000-52B7-3F89108EB280" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ht3u~xihf_rvb8"><intent_id>1052492</intent_id><project_id>907255</project_id><text_data>Asbestos removal</text_data><comment_date>2020-04-20T00:00:00</comment_date></row><row _id="row-p78z.th4k-xad4" _uuid="00000000-0000-0000-69AA-03D7BC3F135D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p78z.th4k-xad4"><intent_id>658436</intent_id><project_id>745840</project_id><text_data>Spray noxious weed Bohemian knotweed with herbicide using 4gal Solo backpack sprayer.  Drive to and from site in standard 4X2 Toyota pickup truck (two axles total).</text_data><comment_date>2014-10-03T00:00:00</comment_date></row><row _id="row-4db7.39vf_dgmi" _uuid="00000000-0000-0000-4941-B9C3E51C1969" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4db7.39vf_dgmi"><intent_id>855276</intent_id><project_id>829883</project_id><text_data>The General Contractor of this project is responsible for the majority of the project. Our portion of the contract is for the replanting of vegitation. We wil not be using any special equipment.</text_data><comment_date>2017-08-16T00:00:00</comment_date></row><row _id="row-udav-54pa.k3wf" _uuid="00000000-0000-0000-0025-FE2AC14D38B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-udav-54pa.k3wf"><intent_id>701390</intent_id><project_id>747260</project_id><text_data>We carry our own Industrial Insurance.  You have the information on file.  Thanks!</text_data><comment_date>2015-06-17T00:00:00</comment_date></row><row _id="row-m5u6~ck2z-7cup" _uuid="00000000-0000-0000-ACF5-C9B520BDE54F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m5u6~ck2z-7cup"><intent_id>790595</intent_id><project_id>798465</project_id><text_data>Filed by Mike Sels</text_data><comment_date>2016-09-20T00:00:00</comment_date></row><row _id="row-eknv_k9p5_cwg8" _uuid="00000000-0000-0000-EE53-A09E050FB180" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eknv_k9p5_cwg8"><intent_id>738382</intent_id><project_id>781109</project_id><text_data>Dust control barrier per square foot 86x20 1720.00SF. Peel and seal zipper -heavy duty. 14- Air Mover for 24 hours. 7- Dehumidifiers for 24 hours.3 men 7 hours to set up barrier and equipment. 1 man 1 hour for two days to monitor. 2 men three hours to remove barrier and equipment. 2 vans to transport men and equipment.</text_data><comment_date>2015-12-23T00:00:00</comment_date></row><row _id="row-3m3s_9bti-37j7" _uuid="00000000-0000-0000-CE92-77249A5BC57E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3m3s_9bti-37j7"><intent_id>964451</intent_id><project_id>875199</project_id><text_data>WO #9530760</text_data><comment_date>2019-03-11T00:00:00</comment_date></row><row _id="row-xcqr-m5sp.4heq" _uuid="00000000-0000-0000-A8D4-37DD75BD2E0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xcqr-m5sp.4heq"><intent_id>1035597</intent_id><project_id>887074</project_id><text_data>Oldcastle precast believes that the work and hours described in this intent to pay prevailing wage and/or affidavit of wages paid is not subject to payment of prevailing wage.  Oldcastle precast's filing of an intent to pay prevailing wage and/or affidavit of wages paid may not be construed in any manner whatsoever as an acknowledgement or agreement that the work and hours described therein are subject to payment of prevailing wage.</text_data><comment_date>2020-02-03T00:00:00</comment_date></row><row _id="row-4ty6~nkmz_qvcv" _uuid="00000000-0000-0000-9B3E-23A0F50BC35E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ty6~nkmz_qvcv"><intent_id>674887</intent_id><project_id>753733</project_id><text_data>From: Edson, Richard [mailto:rick.edson@davey.com] Sent: Tuesday, April 25, 2017 10:50 AMTo: LNI RE Prevailing Wage Worker 1 &amp;lt;PW1@LNI.WA.GOV&amp;gt;Cc: Stahli, Emil &amp;lt;Emil.Stahli@davey.com&amp;gt;; Gerales, Hope &amp;lt;Hope.Gerales@davey.com&amp;gt;; Stainer, Kelly (KJStainer@SNOPUD.com) &amp;lt;KJStainer@SNOPUD.com&amp;gt;Subject: RE: Intent 674887 PWC 80571 - O&amp;M and Capital Tree Trimming Dock CrewsREVISED CONTRACT TOTALHello,I am writing to clarify the total contract value for PWC 80571 between Davey Tree and Snohomish County PUD #1.The cumulative reported monthly contract values over the 24-month term do not agree with the amended reconciled amount.Please accept this message as Davey�s declaration of $4,364,834.37 for the final and true contrac value for the above PWC 80571.Please feel free to contact me if any questions arise. Thank you.Rick Edson | Secretary-Business ManagerDavey Tree Surgery Company, a subsidiary of The Davey Tree Expert Company2617 South Vasco Road, Livermore CA 94550 925-443-1723 x 3217http://www.davey.com/</text_data><comment_date>2017-04-25T00:00:00</comment_date></row><row _id="row-ir5f.7mvc.vsxm" _uuid="00000000-0000-0000-F693-22A6D877B484" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ir5f.7mvc.vsxm"><intent_id>943680</intent_id><project_id>865648</project_id><text_data>Responding to Correction Notice: Pay correction has been submitted to compensate our technician at the Inside Electrician rate for the 0.25 hours to account for battery and transfer testing.Other trade rates updated to represent the actual technician on site.Owner/Operator changed from '1' to '0' - No owner/operators performed work on this site.</text_data><comment_date>2019-01-24T00:00:00</comment_date></row><row _id="row-uuzm-hvh7_rnte" _uuid="00000000-0000-0000-3D0A-AA041707AD5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uuzm-hvh7_rnte"><intent_id>720729</intent_id><project_id>771245</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2015-09-15T00:00:00</comment_date></row><row _id="row-wmqr_jyrb~s2xe" _uuid="00000000-0000-0000-4221-132E00061CE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wmqr_jyrb~s2xe"><intent_id>777152</intent_id><project_id>774791</project_id><text_data>Filed by Linnie ShaverState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- Replace Humidifiers at WSHMPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?Upgrade HVAC Control System for energy saving2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.) Does this project entail the remodeling or new construction of a facility? Yes, but not performed by Siemens4.) If your firm is working upon a type of building system, what type of system is involved? HVAC Control Systems5.) What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.) Are you going to be hiring any subcontractors for this project?Yes.</text_data><comment_date>2016-07-25T00:00:00</comment_date></row><row _id="row-r9ht.iag8-nqhc" _uuid="00000000-0000-0000-905B-4C25749DEF28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9ht.iag8-nqhc"><intent_id>617841</intent_id><project_id>729837</project_id><text_data>TECHS TO INSTALL 280 CAT5E TELECOMMUNICATIONS CABLES FOR ANCILARY EQUIPMENT IN THE ADMIN BUILDING</text_data><comment_date>2014-02-26T00:00:00</comment_date></row><row _id="row-q6y6~42bc~7rkc" _uuid="00000000-0000-0000-1641-61A898B091E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q6y6~42bc~7rkc"><intent_id>855965</intent_id><project_id>819541</project_id><text_data>170265</text_data><comment_date>2017-08-18T00:00:00</comment_date></row><row _id="row-w2rg-8yqz_7xqh" _uuid="00000000-0000-0000-4DC3-240DCE0BF81F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w2rg-8yqz_7xqh"><intent_id>1205116</intent_id><project_id>995540</project_id><text_data>2022-0145</text_data><comment_date>2022-01-17T00:00:00</comment_date></row><row _id="row-dvsc~czwz-x49h" _uuid="00000000-0000-0000-7FD1-4A95F086F86E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dvsc~czwz-x49h"><intent_id>1022529</intent_id><project_id>899920</project_id><text_data>WRS Job #C19-583PW</text_data><comment_date>2019-11-19T00:00:00</comment_date></row><row _id="row-8jwi-ctfv-8k68" _uuid="00000000-0000-0000-1DCE-D611231E31EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8jwi-ctfv-8k68"><intent_id>858322</intent_id><project_id>830882</project_id><text_data>Installation of indoor telephone telecommunications cabling</text_data><comment_date>2017-08-24T00:00:00</comment_date></row><row _id="row-xf5c~s2ii_yeqg" _uuid="00000000-0000-0000-40C9-3428C5BEE6EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xf5c~s2ii_yeqg"><intent_id>936221</intent_id><project_id>862685</project_id><text_data>46929 - Troubleshoot and repair of elevator/access control integration issues.</text_data><comment_date>2018-09-27T00:00:00</comment_date></row><row _id="row-m759-42pn~fjf7" _uuid="00000000-0000-0000-2436-0942E09C0D7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m759-42pn~fjf7"><intent_id>908359</intent_id><project_id>852277</project_id><text_data>Inv# 39036623 $3089.00+tax 237.85; total $3326.85</text_data><comment_date>2018-06-01T00:00:00</comment_date></row><row _id="row-tmzq_hkgf_s9gq" _uuid="00000000-0000-0000-86D5-A1D31E38CCB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tmzq_hkgf_s9gq"><intent_id>944439</intent_id><project_id>816956</project_id><text_data>street sweeper</text_data><comment_date>2018-11-07T00:00:00</comment_date></row><row _id="row-i8bv_cgsu_vs82" _uuid="00000000-0000-0000-A59E-97E51B2BB1DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i8bv_cgsu_vs82"><intent_id>932484</intent_id><project_id>861300</project_id><text_data>Job site is the Prosser Campus</text_data><comment_date>2018-09-12T00:00:00</comment_date></row><row _id="row-97ft~usau-rqnf" _uuid="00000000-0000-0000-1F76-F84C71DE1BEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-97ft~usau-rqnf"><intent_id>1021635</intent_id><project_id>801991</project_id><text_data>Work performed by the Telecommunication Technicians is installing Category 6 cabling and fiber optic cabling for voice and data indoors. PowerCom #4206734401 Aubrey L White Parkway Spokane, WA 99205</text_data><comment_date>2019-11-14T00:00:00</comment_date></row><row _id="row-5z4q.3rpm-maub" _uuid="00000000-0000-0000-A0A7-79367F0E7CC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5z4q.3rpm-maub"><intent_id>991546</intent_id><project_id>887087</project_id><text_data>Job Order Contract MC-0319178Project No.  U00408 - CCE 73990-0023</text_data><comment_date>2019-07-12T00:00:00</comment_date></row><row _id="row-bptd_xmh8.smfi" _uuid="00000000-0000-0000-0621-8EE882C7D806" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bptd_xmh8.smfi"><intent_id>457617</intent_id><project_id>666827</project_id><text_data>D Seymour - 1856 Loranie St</text_data><comment_date>2011-05-25T00:00:00</comment_date></row><row _id="row-s8ub_5egn.8msp" _uuid="00000000-0000-0000-1862-354F7B77669C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s8ub_5egn.8msp"><intent_id>813469</intent_id><project_id>812324</project_id><text_data>Elect Tech(06)Indoor workLow voltage cabling- install cabling for wireless access control devices</text_data><comment_date>2017-01-30T00:00:00</comment_date></row><row _id="row-fsxv_dgu7~hkpj" _uuid="00000000-0000-0000-135C-45F6BBE1D9CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fsxv_dgu7~hkpj"><intent_id>860052</intent_id><project_id>824283</project_id><text_data>Filed by Evaristo Silva Jr</text_data><comment_date>2017-08-31T00:00:00</comment_date></row><row _id="row-ivgx_ibk5-a2s2" _uuid="00000000-0000-0000-B83B-7CA61C91C96F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ivgx_ibk5-a2s2"><intent_id>990311</intent_id><project_id>869235</project_id><text_data>Interwest job number 1215TUCKS-lowboy delivers rotomill to job site, sweeper driven to job site</text_data><comment_date>2019-07-09T00:00:00</comment_date></row><row _id="row-wr2b~uwd4-3czt" _uuid="00000000-0000-0000-E3A2-5F56BEEFB0FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wr2b~uwd4-3czt"><intent_id>923331</intent_id><project_id>857838</project_id><text_data>Filed by Vicente Rocha</text_data><comment_date>2018-08-06T00:00:00</comment_date></row><row _id="row-9ca4-ykdq-fa2g" _uuid="00000000-0000-0000-BB03-B0B6DE055CAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ca4-ykdq-fa2g"><intent_id>1040216</intent_id><project_id>909426</project_id><text_data>Prime Job# 3001514</text_data><comment_date>2020-02-21T00:00:00</comment_date></row><row _id="row-mfrb~g6mq.39dw" _uuid="00000000-0000-0000-02CE-1A6BB26F54D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mfrb~g6mq.39dw"><intent_id>1010744</intent_id><project_id>894680</project_id><text_data>Builing component replacement-Doors &amp; siding &amp;trim-paint film  &amp;  lead wastes handlying &amp; dipsal</text_data><comment_date>2019-11-06T00:00:00</comment_date></row><row _id="row-c8k8.8zn7~id5n" _uuid="00000000-0000-0000-5C24-D57410123673" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c8k8.8zn7~id5n"><intent_id>1249146</intent_id><project_id>1021949</project_id><text_data>HELLO, AMBER HERE IS THE INTENT 2022-2 FOR SCOTT JUNGBLOM.</text_data><comment_date>2022-07-14T00:00:00</comment_date></row><row _id="row-5uq7_h6gr.fqt3" _uuid="00000000-0000-0000-6924-525C9674493D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5uq7_h6gr.fqt3"><intent_id>823822</intent_id><project_id>816970</project_id><text_data>#1 Replace bath fan. #2 Single family dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2017-03-31T00:00:00</comment_date></row><row _id="row-8mwt_kpzd_jshd" _uuid="00000000-0000-0000-E057-9B2B0DA3675C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8mwt_kpzd_jshd"><intent_id>1011727</intent_id><project_id>895065</project_id><text_data>Filed By Sheryl Davis</text_data><comment_date>2019-10-02T00:00:00</comment_date></row><row _id="row-edqe.3g37_dxti" _uuid="00000000-0000-0000-3584-5DE614093EBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-edqe.3g37_dxti"><intent_id>1061690</intent_id><project_id>920738</project_id><text_data>1520127</text_data><comment_date>2020-06-01T00:00:00</comment_date></row><row _id="row-vqvz~p6yy.ebze" _uuid="00000000-0000-0000-2C45-C98AB300C6E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vqvz~p6yy.ebze"><intent_id>794738</intent_id><project_id>795160</project_id><text_data>Filed by Jamie Guzman</text_data><comment_date>2016-10-07T00:00:00</comment_date></row><row _id="row-7w2d_cz4a-bpve" _uuid="00000000-0000-0000-C565-FA9C0D3BCCCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7w2d_cz4a-bpve"><intent_id>726865</intent_id><project_id>774811</project_id><text_data>We replaced some plastic fingers on a conveyor belt using hand tools only. If there is a different classification I should use let me know.</text_data><comment_date>2015-10-23T00:00:00</comment_date></row><row _id="row-mbz5~wmnr.78i2" _uuid="00000000-0000-0000-FFD6-5A9113D4F2BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbz5~wmnr.78i2"><intent_id>737983</intent_id><project_id>780922</project_id><text_data>1)HVAC service, 2) Single Family Residence, 3) One level , 4) A)NO, B)NO, C)YES, D)NO, E)NO, F)NO, G)NO, H)NO, I)NO, J)NO, 5) one kitchen in residence, 6) one bathroom in home,  7) No, 8) No</text_data><comment_date>2015-12-16T00:00:00</comment_date></row><row _id="row-iedr-rwxp_8qfz" _uuid="00000000-0000-0000-19B1-FA532DEC98D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iedr-rwxp_8qfz"><intent_id>886153</intent_id><project_id>841611</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2018-02-01T00:00:00</comment_date></row><row _id="row-7cfc_cyrd-u7e9" _uuid="00000000-0000-0000-4082-91082089CB63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7cfc_cyrd-u7e9"><intent_id>752069</intent_id><project_id>787521</project_id><text_data>In order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2- Single Family3-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- nok- no6- no7- no8- noThorne Rose Campbell4054 Letitia Ave S</text_data><comment_date>2016-03-17T00:00:00</comment_date></row><row _id="row-pjze.3ava.kz2h" _uuid="00000000-0000-0000-9C12-CF3A97D92777" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjze.3ava.kz2h"><intent_id>647554</intent_id><project_id>741696</project_id><text_data>LNI #108,473-00</text_data><comment_date>2014-08-13T00:00:00</comment_date></row><row _id="row-4siq.ka4e-kq8n" _uuid="00000000-0000-0000-057D-2E32C72BCBA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4siq.ka4e-kq8n"><intent_id>602851</intent_id><project_id>721103</project_id><text_data>We pay 100% of Employee's Health Ins.</text_data><comment_date>2013-11-04T00:00:00</comment_date></row><row _id="row-2vuy.9fth.yu47" _uuid="00000000-0000-0000-DE2D-FAA579B08366" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2vuy.9fth.yu47"><intent_id>851676</intent_id><project_id>828783</project_id><text_data>Employees were paid $45.25 Less rain for rent benefits</text_data><comment_date>2017-08-01T00:00:00</comment_date></row><row _id="row-x36q.9se7-ig4b" _uuid="00000000-0000-0000-2A3C-F8BB25BB6D29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x36q.9se7-ig4b"><intent_id>481132</intent_id><project_id>675442</project_id><text_data>Laurels at Mill Creek is a residential apartment complex that has 163 units. Each unit has a kitchen and at least one bathroom and is considered a permanent primary residence for all its tenants. The building is no more than three stories in height. The electricians will be replacing light bulbs and the plumber will be replacing showerheads. This job meets the residential job requirements.</text_data><comment_date>2011-09-29T00:00:00</comment_date></row><row _id="row-hen9.mi43_892f" _uuid="00000000-0000-0000-2015-282EAC46017B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hen9.mi43_892f"><intent_id>746926</intent_id><project_id>785170</project_id><text_data>Adding a FlexIP intrusion system to the High School in the Football field bowl &amp;quot;Blockhouse&amp;quot;.</text_data><comment_date>2016-02-16T00:00:00</comment_date></row><row _id="row-7vm4.4zti-6z9h" _uuid="00000000-0000-0000-2493-0E27874D82CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7vm4.4zti-6z9h"><intent_id>687399</intent_id><project_id>759229</project_id><text_data>Form filed by:  Kevin Cassidy</text_data><comment_date>2015-04-03T00:00:00</comment_date></row><row _id="row-daca~wyyy_fpnt" _uuid="00000000-0000-0000-A70E-BB359FA5AF20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-daca~wyyy_fpnt"><intent_id>893091</intent_id><project_id>839344</project_id><text_data>Park Improvements Our part landscaping shrubs, mulch and lawn seeding.</text_data><comment_date>2018-03-15T00:00:00</comment_date></row><row _id="row-p6wd~ydb6-paxx" _uuid="00000000-0000-0000-008B-B4ADCF677B33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p6wd~ydb6-paxx"><intent_id>1013022</intent_id><project_id>895584</project_id><text_data>Other trucks refers to water trucks</text_data><comment_date>2019-10-29T00:00:00</comment_date></row><row _id="row-t3sc_emv3.d56f" _uuid="00000000-0000-0000-940F-C7D908499200" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3sc_emv3.d56f"><intent_id>495707</intent_id><project_id>616536</project_id><text_data>Hydroblast vaultGeneral Laborers use to keep area clean of debris with small hand tools, brooms, shovels</text_data><comment_date>2012-01-05T00:00:00</comment_date></row><row _id="row-n7k5.icfj.gjd7" _uuid="00000000-0000-0000-88D0-15475ED24CBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n7k5.icfj.gjd7"><intent_id>879354</intent_id><project_id>839482</project_id><text_data>Filing intent per MJW for SRO 896548</text_data><comment_date>2017-12-14T00:00:00</comment_date></row><row _id="row-pu58~np6p_s2nt" _uuid="00000000-0000-0000-8A0D-7A1B9FB56D9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pu58~np6p_s2nt"><intent_id>929844</intent_id><project_id>860280</project_id><text_data>Filed by Eduardo Gonzalez</text_data><comment_date>2018-08-30T00:00:00</comment_date></row><row _id="row-hqjy~dxvs~qt9s" _uuid="00000000-0000-0000-6CA4-4378A416BFC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hqjy~dxvs~qt9s"><intent_id>522719</intent_id><project_id>691736</project_id><text_data>Job # 171874</text_data><comment_date>2012-07-17T00:00:00</comment_date></row><row _id="row-2f9h~d2tu_6ccs" _uuid="00000000-0000-0000-79FA-D237A4229B15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2f9h~d2tu_6ccs"><intent_id>812847</intent_id><project_id>798987</project_id><text_data>1650 Tumwater MSCE</text_data><comment_date>2017-01-25T00:00:00</comment_date></row><row _id="row-zgbt-9qij-cggf" _uuid="00000000-0000-0000-CC41-F1DAD1C878DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zgbt-9qij-cggf"><intent_id>659311</intent_id><project_id>746200</project_id><text_data>The work consisted of structured cat6 cabling from indoor IDF's to classrooms. One end of the Cat6 cable was punched down on a 110 network patch panel and the other was punched down to a single female data jack.</text_data><comment_date>2014-10-10T00:00:00</comment_date></row><row _id="row-bub3_c57n_x2r9" _uuid="00000000-0000-0000-8AFB-76CFEE102A57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bub3_c57n_x2r9"><intent_id>945614</intent_id><project_id>866399</project_id><text_data>On Call Work: Service Calls &amp; Emergency Repairs</text_data><comment_date>2018-11-13T00:00:00</comment_date></row><row _id="row-6izv_wa5r-i8ab" _uuid="00000000-0000-0000-1222-40C52CE5B575" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6izv_wa5r-i8ab"><intent_id>924807</intent_id><project_id>858416</project_id><text_data>A subcontractor was used for the Electrical Portion of this work.</text_data><comment_date>2018-08-23T00:00:00</comment_date></row><row _id="row-ny5r.s6yz.xjgy" _uuid="00000000-0000-0000-272B-53783F9B013A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ny5r.s6yz.xjgy"><intent_id>608173</intent_id><project_id>725471</project_id><text_data>#1 INSTALL RESIDENTIAL HEATING SYSTEM#2 SINGLE FAMILY #3 SINGLE#4 (a) NO (b) NO (c) YES  (d) NO (e) NO (f) NO (g) NO (h) NO (i) NO (j) NO (k) NO #5 YES#6 YES#7 NO#8 NO</text_data><comment_date>2013-12-12T00:00:00</comment_date></row><row _id="row-eke4_geyj_6gia" _uuid="00000000-0000-0000-25F7-2C02F9DFC190" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eke4_geyj_6gia"><intent_id>549438</intent_id><project_id>684153</project_id><text_data>Other Trucks (E.WA-690) is a 1500 gallon water truck used to flush asphalt.</text_data><comment_date>2012-12-20T00:00:00</comment_date></row><row _id="row-8cmd_p5dq-dfdn" _uuid="00000000-0000-0000-A804-DA71DBC5CC98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8cmd_p5dq-dfdn"><intent_id>644069</intent_id><project_id>740385</project_id><text_data>employees Adam Terhune</text_data><comment_date>2014-07-29T00:00:00</comment_date></row><row _id="row-upxk.b7mh~gqys" _uuid="00000000-0000-0000-DC23-C787DB0B1C93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-upxk.b7mh~gqys"><intent_id>620404</intent_id><project_id>722066</project_id><text_data>General labor work consists of hand work only. (shovel work)  No power equipment or power tools are used by the general laborer.</text_data><comment_date>2014-03-17T00:00:00</comment_date></row><row _id="row-a9ww_gae7.4ah8" _uuid="00000000-0000-0000-E182-73503F4013FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a9ww_gae7.4ah8"><intent_id>818987</intent_id><project_id>814790</project_id><text_data>I am reusing this form so please disregard any previously submitted notes.This job is running off of the DES ContractRe pack, waste and clean cabinetHaz Waste workers to clear contaminated waste from cabinet and lab pack then clean cabinet using rags/sponges</text_data><comment_date>2017-03-16T00:00:00</comment_date></row><row _id="row-gt4m_apft-nb69" _uuid="00000000-0000-0000-460A-D7528E1829C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gt4m_apft-nb69"><intent_id>849293</intent_id><project_id>818636</project_id><text_data>Source Electric LLC pays the following hourly rates to the Local 76&amp;#39;s trust office; Health and Welfare ($7.47), Local Pension ($3.59), Pacific Coast Pension ($11.06), Local Retirement H&amp;W ($0.50), JATC ($0.67), NEBF @ 3% ($1.09), BAMF Fund ($0.30), LMCC ($0.10), Admin Fund ($0.05)</text_data><comment_date>2017-07-21T00:00:00</comment_date></row><row _id="row-prxm_5kby_ww76" _uuid="00000000-0000-0000-C96B-29143D917B51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prxm_5kby_ww76"><intent_id>790658</intent_id><project_id>800951</project_id><text_data>Hauling of materials</text_data><comment_date>2016-09-20T00:00:00</comment_date></row><row _id="row-nqh6.y6dm.afjh" _uuid="00000000-0000-0000-A6A9-94FE950D0E73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nqh6.y6dm.afjh"><intent_id>508058</intent_id><project_id>686073</project_id><text_data>We are building an outdoor classroom patio out of stone, pavers &amp; gravel.  Then we are planting Leyland Cypress trees &amp; mosses</text_data><comment_date>2012-04-19T00:00:00</comment_date></row><row _id="row-4i4u~q93s-2u5c" _uuid="00000000-0000-0000-3E41-8E185BE2C5D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4i4u~q93s-2u5c"><intent_id>639189</intent_id><project_id>719913</project_id><text_data>I intend to perform all tile work alone as owner operator</text_data><comment_date>2014-07-06T00:00:00</comment_date></row><row _id="row-fnzn~ynak~thrv" _uuid="00000000-0000-0000-BF27-1B38ABB94519" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fnzn~ynak~thrv"><intent_id>528149</intent_id><project_id>690074</project_id><text_data>Form filed by: Vern Flanery - petu235</text_data><comment_date>2012-08-13T00:00:00</comment_date></row><row _id="row-p4dp_f63g~9rk3" _uuid="00000000-0000-0000-3B46-F1D4110D4E8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4dp_f63g~9rk3"><intent_id>733430</intent_id><project_id>777739</project_id><text_data>Workers Keith Burrell and Mike Poe</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-chqi_8445~je7t" _uuid="00000000-0000-0000-81B2-122EA79788D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-chqi_8445~je7t"><intent_id>507708</intent_id><project_id>685935</project_id><text_data>$5.07 NW Pension$1.52 National Pension$8.10 Health $.17 International Training Institute ($.12) NEMI ($.03) SMOHI ($.02)$.66 Apprenticeship Fund$.33 Industry Fund$1.00 Organizational Trust Fund$.68 Northwest Supplemental Plan$.07 SNAP Clean Card</text_data><comment_date>2012-04-13T00:00:00</comment_date></row><row _id="row-xchq~2c7q.27zy" _uuid="00000000-0000-0000-3C41-6587E6763FC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xchq~2c7q.27zy"><intent_id>567273</intent_id><project_id>710013</project_id><text_data>Filed by: Stephanie KhounborinTech Rep scope of work for Infrared Scans: Walk roof surface with hand held thermal imaging device pointed at the surface to take non-destructive roof scans to map areas of the roof to later determine the condition of the roof by computers.</text_data><comment_date>2013-05-01T00:00:00</comment_date></row><row _id="row-jfuz.dyr5_5yty" _uuid="00000000-0000-0000-DA26-04A2C707B57A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jfuz.dyr5_5yty"><intent_id>1036935</intent_id><project_id>880522</project_id><text_data>LEI #644919</text_data><comment_date>2020-02-07T00:00:00</comment_date></row><row _id="row-wxwi.j6a2_9ztk" _uuid="00000000-0000-0000-5207-8BC28CC7D923" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wxwi.j6a2_9ztk"><intent_id>708854</intent_id><project_id>762817</project_id><text_data>Form filed by:  Don Love</text_data><comment_date>2015-07-21T00:00:00</comment_date></row><row _id="row-v86u-9eai-r65r" _uuid="00000000-0000-0000-9015-BF88418BFBED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v86u-9eai-r65r"><intent_id>1125056</intent_id><project_id>952185</project_id><text_data>SRO 1911576</text_data><comment_date>2021-02-25T00:00:00</comment_date></row><row _id="row-uqmi_bz2h.eakp" _uuid="00000000-0000-0000-ED45-16A277213B2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uqmi_bz2h.eakp"><intent_id>900673</intent_id><project_id>849195</project_id><text_data>Other Trucks = 4,000 Gallon Water Truck</text_data><comment_date>2018-05-08T00:00:00</comment_date></row><row _id="row-6cu5-x8up-32is" _uuid="00000000-0000-0000-12BA-8C165C16F2AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6cu5-x8up-32is"><intent_id>1129175</intent_id><project_id>954490</project_id><text_data>Sprinkler system went off. we were hired to do the water extraction and drying of the project. We  use  the portable extractor to extract the water and we use dehumidifiers and airmovers for the drying process, Our technicians did the extraction and the equipment was left behind and not monitored.</text_data><comment_date>2021-04-27T00:00:00</comment_date></row><row _id="row-htka_bhwp-g2r9" _uuid="00000000-0000-0000-1784-A559BDC463D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-htka_bhwp-g2r9"><intent_id>612507</intent_id><project_id>727539</project_id><text_data>LR 1/16/2014JOB 3474INVOICE 1077026</text_data><comment_date>2014-01-16T00:00:00</comment_date></row><row _id="row-ncsd.faiq_bnmb" _uuid="00000000-0000-0000-E4BD-DD9827E8C29D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ncsd.faiq_bnmb"><intent_id>807182</intent_id><project_id>809369</project_id><text_data>Clean Catch basinHaz Waste workers to clean and re-grout area using rags/sponges</text_data><comment_date>2016-12-15T00:00:00</comment_date></row><row _id="row-3t64.rzqy_dday" _uuid="00000000-0000-0000-3073-FB4D75EEED09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3t64.rzqy_dday"><intent_id>674582</intent_id><project_id>753563</project_id><text_data>Task Order # P9033Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor).  For this Intent filing firms are to enter �Time and Materials� for  the dollar amount of the contract as an exact dollar amount cannot be identified at the time of filing. To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  When filing these forms, the dollar amount of the contract (which is the total amount that will be invoiced), including tax, will be entered on the form along with a short explanation in the notes section about the nature of the work so that the project can be tracked by the awarding agency and L&amp;I. In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures.  Please note that an on-call/blanket/annual contract may not be utilized for construction projects or for warranty work as these require their own set of Intent and Affidavit forms with the appropriate bid and award dates associated with those specific contracts.  The use of on-call/blanket/annual contracts is limited to minor maintenance and repair work.  If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out.  This form filing requirement also applies to owner/operators.  Please follow this filing method on any future contracts covered under this policy.  (RCW 39.12.040) We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.  A link is provided below.</text_data><comment_date>2015-01-14T00:00:00</comment_date></row><row _id="row-nsv3-qtey-tvwz" _uuid="00000000-0000-0000-AB25-5F3B4F562AC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nsv3-qtey-tvwz"><intent_id>1181366</intent_id><project_id>974583</project_id><text_data>2121034</text_data><comment_date>2021-09-28T00:00:00</comment_date></row><row _id="row-dpmc_7p6s_dk8v" _uuid="00000000-0000-0000-47E3-A645921C9984" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpmc_7p6s_dk8v"><intent_id>616593</intent_id><project_id>718310</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2014-02-17T00:00:00</comment_date></row><row _id="row-zq4f_rr7v.gbux" _uuid="00000000-0000-0000-F099-661757144BE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zq4f_rr7v.gbux"><intent_id>812615</intent_id><project_id>810823</project_id><text_data>1701 - Curtis High SchoolCE</text_data><comment_date>2017-01-24T00:00:00</comment_date></row><row _id="row-sk9t.xudm.nzmr" _uuid="00000000-0000-0000-F08D-DA80C87414D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sk9t.xudm.nzmr"><intent_id>1105628</intent_id><project_id>941181</project_id><text_data>We do various tree trimming/removals for different areas depending on which department calls us and where they need the work done. Lifts, chippers and dump trucks along with saws are used. The contract was extended for another year</text_data><comment_date>2020-11-24T00:00:00</comment_date></row><row _id="row-q5dx.pnn4_yepj" _uuid="00000000-0000-0000-BCDE-2B18A67CD9E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5dx.pnn4_yepj"><intent_id>1015023</intent_id><project_id>889723</project_id><comment_date>2019-10-13T00:00:00</comment_date></row><row _id="row-6n9v_iyaf-tt8g" _uuid="00000000-0000-0000-86F7-7ED9D8BA8403" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6n9v_iyaf-tt8g"><intent_id>1168355</intent_id><project_id>965444</project_id><text_data>Employees will be paid prevailing wages as required and they will be given their fringe funds directly. Fringe funds will not be distributed to other plans or programs.</text_data><comment_date>2021-08-11T00:00:00</comment_date></row><row _id="row-kzqn.mqbu_awky" _uuid="00000000-0000-0000-855B-92C24471CCEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kzqn.mqbu_awky"><intent_id>604765</intent_id><project_id>699206</project_id><text_data>Filed by Jon Newman</text_data><comment_date>2013-11-15T00:00:00</comment_date></row><row _id="row-t8s3_7ski~yxtp" _uuid="00000000-0000-0000-19A9-909837E723CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t8s3_7ski~yxtp"><intent_id>467611</intent_id><project_id>670699</project_id><text_data>Spraying weeds on sidewalks through the city.</text_data><comment_date>2011-08-09T00:00:00</comment_date></row><row _id="row-n9up-s3fn~b8xn" _uuid="00000000-0000-0000-AC4A-971AD5BA19C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n9up-s3fn~b8xn"><intent_id>588667</intent_id><project_id>685508</project_id><text_data>Employees will be installing the sand by wheel barrow/shovel and will then be hand grading it out with rakes to prepare the grounds for the pavers to be installed.  The owner/operator will be installing the pavers onto the pathways.</text_data><comment_date>2013-09-04T00:00:00</comment_date></row><row _id="row-yrzs-8qah.vypw" _uuid="00000000-0000-0000-6D15-E3C8BE2FE571" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yrzs-8qah.vypw"><intent_id>1219948</intent_id><project_id>956252</project_id><text_data>Job #2105</text_data><comment_date>2022-03-22T00:00:00</comment_date></row><row _id="row-ezj2.7xnk.gzaf" _uuid="00000000-0000-0000-88ED-1668427A49AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezj2.7xnk.gzaf"><intent_id>1004308</intent_id><project_id>892096</project_id><text_data>Filed By R.T.Vatne</text_data><comment_date>2019-09-03T00:00:00</comment_date></row><row _id="row-ppxx-4ijp~t23m" _uuid="00000000-0000-0000-7736-0FB5C86A75B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ppxx-4ijp~t23m"><intent_id>647363</intent_id><project_id>741619</project_id><text_data>Form filed by: Deborah JohnsonThis particular project is the maintenance of vegetation within retention area.Northwest Mowing and Gardening will be maintaining the vegetation within the retention area. Work will include but not limited to the string trimming and hand brush cutting vegetation.</text_data><comment_date>2014-08-12T00:00:00</comment_date></row><row _id="row-ugmi~w97i-7qpk" _uuid="00000000-0000-0000-F2CE-47864B915A81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ugmi~w97i-7qpk"><intent_id>683905</intent_id><project_id>757680</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION BUNDLE OF 8 JOBS. THEY ARE ALL SINGLE FAMILY RESIDENTIAL DWELLINGS.1. 651 CENTERVILLE HWY, LYLE2. 445 ROCK CREEK RD, STEVENSON</text_data><comment_date>2015-03-16T00:00:00</comment_date></row><row _id="row-ragv-jue8-8zqi" _uuid="00000000-0000-0000-6BD8-B9AF9CEB0463" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ragv-jue8-8zqi"><intent_id>1419077</intent_id><project_id>1120101</project_id><text_data>9939902</text_data><comment_date>2024-04-14T00:00:00</comment_date></row><row _id="row-4rmg-jkja.dsn7" _uuid="00000000-0000-0000-BA94-EE5765599AFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4rmg-jkja.dsn7"><intent_id>486253</intent_id><project_id>666986</project_id><text_data>#1 Apartment #2 Two Stories #3 (a) yes (b)no (c)no (d)no (e)no (f)no (g)no #4yes #5 yes #6 yes #7 yes</text_data><comment_date>2011-11-01T00:00:00</comment_date></row><row _id="row-pcny_yp5t_nkaa" _uuid="00000000-0000-0000-70AC-7F91F980F6E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pcny_yp5t_nkaa"><intent_id>603704</intent_id><project_id>723239</project_id><text_data>James 1200 Lincoln St #430 98229Sterling 2392 Douglas Dr #46 98248</text_data><comment_date>2013-11-08T00:00:00</comment_date></row><row _id="row-j57b~d62f~jq54" _uuid="00000000-0000-0000-6E7F-2BE9B168824A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j57b~d62f~jq54"><intent_id>710647</intent_id><project_id>767525</project_id><text_data>Form filed by:  Cara D. Yost</text_data><comment_date>2015-07-29T00:00:00</comment_date></row><row _id="row-pns2.bnzj-8rdx" _uuid="00000000-0000-0000-E76B-14FF3D3896F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pns2.bnzj-8rdx"><intent_id>767541</intent_id><project_id>793067</project_id><text_data>TOTAL FRINGE IS PAID TO QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2016-06-10T00:00:00</comment_date></row><row _id="row-chin.qv9n~nr2k" _uuid="00000000-0000-0000-6ED0-810881032B9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-chin.qv9n~nr2k"><intent_id>743270</intent_id><project_id>783450</project_id><text_data>Project is decommissioning two wells for the Fir Island Road, Skagit City to Maupin Road.</text_data><comment_date>2016-02-05T00:00:00</comment_date></row><row _id="row-cuuj_85zn~3mij" _uuid="00000000-0000-0000-9F8E-02A53C7CEB48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cuuj_85zn~3mij"><intent_id>1147156</intent_id><project_id>963663</project_id><text_data>Water/ mold repairsapartment2residential livinga)no b)no c)no d)no e)no f)no g)no h)no i)no j)no k)no l)no5 yes6 yes7 yes8 no</text_data><comment_date>2021-05-24T00:00:00</comment_date></row><row _id="row-qxy8_q9ik.hd2x" _uuid="00000000-0000-0000-95F0-5397D2587265" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qxy8_q9ik.hd2x"><intent_id>811272</intent_id><project_id>811309</project_id><text_data>This contract is for Landscape Maintenance at multiple Park and city sites in the city of Kenmore.  This project is to consist of mowing, edging, trimming, bed care, pruning, and leaf fall removal at all sites.  Equipment to be used will be walk behind mowers, weedeaters, pruning shears, backpack blowers, rakes, shovels, buckets and hoes as required to complete the maintenance of the established planting and turf areas for these City of Kenmore sites.  This service is on a set schedule, weekly from March 1 through October 31, and bi-weekly for the Months, January, February, November, and December.</text_data><comment_date>2017-01-16T00:00:00</comment_date></row><row _id="row-kghh_gdss~naxs" _uuid="00000000-0000-0000-7884-A6A6D263BEBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kghh_gdss~naxs"><intent_id>1055277</intent_id><project_id>917681</project_id><text_data>9844860</text_data><comment_date>2020-05-01T00:00:00</comment_date></row><row _id="row-4wvt-85en_588t" _uuid="00000000-0000-0000-3EB8-7F2DCFECB2BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4wvt-85en_588t"><intent_id>677507</intent_id><project_id>754938</project_id><text_data>TELECOMM TECH TO INSTALL CAT6 DATA/COMM CALBING TO MULITPLE LOCATIONS AND WIRELESS ACCESS POINTS ON 1ST AND SECOND FLOORS OF THE SIEGEL CENTER. WORK TO BE COMPLETED INDOORS.</text_data><comment_date>2015-02-03T00:00:00</comment_date></row><row _id="row-99es.bauz_u3ph" _uuid="00000000-0000-0000-BF1E-D6CB6D283357" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-99es.bauz_u3ph"><intent_id>875488</intent_id><project_id>837480</project_id><text_data>Pumped and cleaned grease trap</text_data><comment_date>2017-11-17T00:00:00</comment_date></row><row _id="row-andm~wzkh-4ytm" _uuid="00000000-0000-0000-D08A-25AF2D1117D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-andm~wzkh-4ytm"><intent_id>693898</intent_id><project_id>761726</project_id><text_data>075028</text_data><comment_date>2015-05-12T00:00:00</comment_date></row><row _id="row-wsfi_piv7~tp2x" _uuid="00000000-0000-0000-7FB2-A29AEE342EC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wsfi_piv7~tp2x"><intent_id>786795</intent_id><project_id>801504</project_id><text_data>August 16, 2016Two crew loaded 5 unframed artworks by hand into a small box truck and transported to Federal Way 320 Library Branch. Works were unloaded by hand, carried into facility, and installed onto drywall walls with a drill and other hand tools at eye level. (3) additional framed artworks already on site also installed into drywall walls with a drill and other hand tools at eye level. Small wall label was also placed next to the art, and nailed into place with a hammer.</text_data><comment_date>2016-09-01T00:00:00</comment_date></row><row _id="row-5m8h_udnm.maww" _uuid="00000000-0000-0000-7086-2C87537F20F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5m8h_udnm.maww"><intent_id>825150</intent_id><project_id>764171</project_id><text_data>Landscape &amp; irrigation construction of new waterfront entrance to Pike Place Market.  Install trees, shrubs, groundcover, irrigation, mulch, topsoil, not to exceed 6&amp;quot; depth.</text_data><comment_date>2017-04-06T00:00:00</comment_date></row><row _id="row-zr6x_t9tw-sixp" _uuid="00000000-0000-0000-929A-933F308489DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zr6x_t9tw-sixp"><intent_id>738215</intent_id><project_id>777800</project_id><text_data>1 sewer cleaning 2 single 3 no 4a no b no c yes d no e no f no g no h no i no j no 5 yes 6 yes 7 no 8 no</text_data><comment_date>2015-12-17T00:00:00</comment_date></row><row _id="row-gytc.8u9y-bbn4" _uuid="00000000-0000-0000-DA49-032F52363549" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gytc.8u9y-bbn4"><intent_id>513122</intent_id><project_id>688097</project_id><text_data>General Laborer Cleaned up debris off grounds.</text_data><comment_date>2012-06-25T00:00:00</comment_date></row><row _id="row-iae9_pzmg~x72m" _uuid="00000000-0000-0000-6C4F-963AC5970275" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iae9_pzmg~x72m"><intent_id>992606</intent_id><project_id>887489</project_id><text_data>PC6 - Job #902-29PO 6091800178CB</text_data><comment_date>2019-07-17T00:00:00</comment_date></row><row _id="row-uf7z_duf8~svf4" _uuid="00000000-0000-0000-27CE-334C4B9C9A54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uf7z_duf8~svf4"><intent_id>994128</intent_id><project_id>888104</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2019-07-24T00:00:00</comment_date></row><row _id="row-vihb~yi6u.zbbq" _uuid="00000000-0000-0000-11C8-3FB992B9350E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vihb~yi6u.zbbq"><intent_id>1181734</intent_id><project_id>981525</project_id><text_data>Payroll is Bi-Weekly _ All hours will be reported after payroll is submitted and available</text_data><comment_date>2021-09-29T00:00:00</comment_date></row><row _id="row-yd49~knvu.9p7p" _uuid="00000000-0000-0000-2C3E-68A7AA876634" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yd49~knvu.9p7p"><intent_id>1023886</intent_id><project_id>900567</project_id><text_data>ERROR ON BOILER #3 IN THE NEW BLDG.</text_data><comment_date>2019-11-26T00:00:00</comment_date></row><row _id="row-xh84_8bf4.up7n" _uuid="00000000-0000-0000-DFFC-BA5021418F25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xh84_8bf4.up7n"><intent_id>683724</intent_id><project_id>754380</project_id><text_data>Filed by Michael HummelExemption Intent Questionnaire form � Fire Station 29Prevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1. What is the specific purpose of this awarding agency&amp;#39;s public works project? Remodel existing building.2. 2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No.3. Does this project entail the remodeling or new construction of a facility? Yes, but not performed by Siemens Employees.4. If your firm is working upon a type of building system, what type of system is involved? HVAC control system.5. What specific tasks did your employees perform? Siemens&amp;#39; BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system&amp;#39;s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs a Technician whether various components are functioning properly as they are triggered. If a component doesn&amp;#39;t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.6. What, if any, tools did your employees use in the performance of those tasks? Laptop Computer7. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No � none.8. Are you going to be hiring any subcontractors for this project? Yes.To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification�, �commissioning� or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2015-03-13T00:00:00</comment_date></row><row _id="row-g96r~xmgs~h9fr" _uuid="00000000-0000-0000-D591-229F2DA2072D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g96r~xmgs~h9fr"><intent_id>604817</intent_id><project_id>724030</project_id><text_data>Work performed by the Telecommunication Technicians is installing Category 5e cabling for voice and data indoors.  Phylical location is 504 NE 9th Street, Seattle, Wa  98115</text_data><comment_date>2013-11-21T00:00:00</comment_date></row><row _id="row-uiri~ygvd_2bpb" _uuid="00000000-0000-0000-1DAA-33D4A7E12F5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uiri~ygvd_2bpb"><intent_id>1094585</intent_id><project_id>927870</project_id><text_data>Truck Driver 'Other' used for truck mounted pick up sweeper and/or 2000-4000 gallon water truck</text_data><comment_date>2020-10-08T00:00:00</comment_date></row><row _id="row-k7nd.m39f~xtap" _uuid="00000000-0000-0000-05B3-D814FF855EAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7nd.m39f~xtap"><intent_id>627496</intent_id><project_id>723820</project_id><text_data>Oldcastle Precast is a self-insured supplier</text_data><comment_date>2014-05-08T00:00:00</comment_date></row><row _id="row-2b6k_a9qr.4vig" _uuid="00000000-0000-0000-E393-AE456979F783" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2b6k_a9qr.4vig"><intent_id>803598</intent_id><project_id>798164</project_id><text_data>The project consisted of replacing an existing permeable levee with a 5 ft x 5 ft box culvert and associated plantings and bank stabilization.  OLM subcontracted to provide the planting portion of the job.  OLM planted 1 gallon and stake size plants.  OLM installed a mulch ring around each plant.  OLM use a marking tape to identify each plant</text_data><comment_date>2016-11-29T00:00:00</comment_date></row><row _id="row-g534-z75p.936v" _uuid="00000000-0000-0000-7AF7-86ABACEABD05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g534-z75p.936v"><intent_id>895994</intent_id><project_id>847214</project_id><text_data>Filed by Mike Carlough</text_data><comment_date>2018-03-30T00:00:00</comment_date></row><row _id="row-s8wf_27jx-q3ys" _uuid="00000000-0000-0000-2919-55CCFB875A5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s8wf_27jx-q3ys"><intent_id>496996</intent_id><project_id>672028</project_id><text_data>Installation of landscape plantings, trees, shrubs, and groundcover, along with 2� of mulch covering in planter beds. Sod lawn installation in turf areas, including underground sprinkler irrigation with an automatic controller. Installed import topsoil to 6� depth in lawn and bed areas. Rototilled topsoil into native subgrade. Used following equipment to install job: backhoe, skidsteer, mini-ex, along with various small hand and power tools. Provided staking to trees.</text_data><comment_date>2012-02-03T00:00:00</comment_date></row><row _id="row-trq2~4snx_p6zr" _uuid="00000000-0000-0000-418E-D91AF6118680" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-trq2~4snx_p6zr"><intent_id>979201</intent_id><project_id>876753</project_id><text_data>Replace bath fanSingle residential home</text_data><comment_date>2019-05-23T00:00:00</comment_date></row><row _id="row-5axb_n8s7_tc23" _uuid="00000000-0000-0000-C53A-3E7B29742FAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5axb_n8s7_tc23"><intent_id>881114</intent_id><project_id>840361</project_id><text_data>The basic function of this crew is to mow, edge, string trim and perform shrub/bed work. this entails using a mower, edger, small backpack blower, weed-eater, and misc hand tools.</text_data><comment_date>2017-12-28T00:00:00</comment_date></row><row _id="row-bcw5~q85a_nr6w" _uuid="00000000-0000-0000-2367-BED367B40E88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bcw5~q85a_nr6w"><intent_id>968211</intent_id><project_id>876972</project_id><text_data>WO# N82365</text_data><comment_date>2019-03-28T00:00:00</comment_date></row><row _id="row-sj86_iv2n~td7m" _uuid="00000000-0000-0000-F327-F6362BAF3D72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sj86_iv2n~td7m"><intent_id>935150</intent_id><project_id>862290</project_id><text_data>.- general construction2.- single family3.- 2 levels4.- a-no,b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-no.5.- yes6.- yes7.- no8.- no</text_data><comment_date>2018-09-24T00:00:00</comment_date></row><row _id="row-y7dd-82pb~rri7" _uuid="00000000-0000-0000-C80F-F676914B75AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y7dd-82pb~rri7"><intent_id>765455</intent_id><project_id>793354</project_id><text_data>1)We were contracted to replace the furnace and water heater 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2016-06-01T00:00:00</comment_date></row><row _id="row-bf5i_q6cv-3445" _uuid="00000000-0000-0000-1B51-8FC4E0EB7D10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bf5i_q6cv-3445"><intent_id>758783</intent_id><project_id>727129</project_id><text_data>Fringe:  Pension/Annuity:  $15.50   Health/Welfare: $7.02   Apprentice/etc: $0.94  Total:  23.46</text_data><comment_date>2016-04-27T00:00:00</comment_date></row><row _id="row-3j9y.jdsw_abex" _uuid="00000000-0000-0000-090C-1481BE95E373" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3j9y.jdsw_abex"><intent_id>892322</intent_id><project_id>845600</project_id><text_data>Andrea Pierce is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be servicing the existing gas furnace. This job meets the residential job requirements.</text_data><comment_date>2018-03-12T00:00:00</comment_date></row><row _id="row-u4dx-3ra2.7j94" _uuid="00000000-0000-0000-094A-BFDA63E8620D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u4dx-3ra2.7j94"><intent_id>947040</intent_id><project_id>859783</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2018-11-21T00:00:00</comment_date></row><row _id="row-3dju~g8rr~cvey" _uuid="00000000-0000-0000-18DC-C560CAB318BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3dju~g8rr~cvey"><intent_id>736374</intent_id><project_id>780176</project_id><text_data>Installation of stockpiled rock and/or gravel, delivered by a 3rd party, to be installed by shovel or rake</text_data><comment_date>2015-12-15T00:00:00</comment_date></row><row _id="row-9hpg~gjqd.ecsz" _uuid="00000000-0000-0000-00F9-7FC04F653255" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9hpg~gjqd.ecsz"><intent_id>1231134</intent_id><project_id>1008398</project_id><text_data>0422529</text_data><comment_date>2022-05-05T00:00:00</comment_date></row><row _id="row-a5k7~apq7-y4zt" _uuid="00000000-0000-0000-AD27-DF1093A37743" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5k7~apq7-y4zt"><intent_id>607833</intent_id><project_id>724146</project_id><text_data>CCWWTP 90193 BP302ACI 13-026</text_data><comment_date>2013-12-10T00:00:00</comment_date></row><row _id="row-dtpy.7yjt_29fm" _uuid="00000000-0000-0000-C09D-669D21848404" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dtpy.7yjt_29fm"><intent_id>887140</intent_id><project_id>843155</project_id><text_data>Elect Tech(06) and Telecom tech(09)Inside work install telephone and data cabling to cubicles</text_data><comment_date>2018-02-07T00:00:00</comment_date></row><row _id="row-wx6h.qjmr-ikxu" _uuid="00000000-0000-0000-C9DA-F4FFC9D27C79" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wx6h.qjmr-ikxu"><intent_id>1028146</intent_id><project_id>902867</project_id><text_data>Invoice # 977061</text_data><comment_date>2019-12-20T00:00:00</comment_date></row><row _id="row-g8eq.vva2_jj44" _uuid="00000000-0000-0000-66D8-9CA4BCA22E54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8eq.vva2_jj44"><intent_id>567890</intent_id><project_id>680955</project_id><text_data>Form filed by: Hwit To Chong</text_data><comment_date>2013-05-03T00:00:00</comment_date></row><row _id="row-yqfa_dptk~j3ib" _uuid="00000000-0000-0000-FFA4-443FAE111D90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yqfa_dptk~j3ib"><intent_id>1199301</intent_id><project_id>991782</project_id><text_data>9879463</text_data><comment_date>2021-12-14T00:00:00</comment_date></row><row _id="row-jh4n_2fyz~j8ni" _uuid="00000000-0000-0000-EF30-147FFE743529" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jh4n_2fyz~j8ni"><intent_id>868171</intent_id><project_id>834745</project_id><text_data>Replace damaged chainlink fence</text_data><comment_date>2017-10-10T00:00:00</comment_date></row><row _id="row-73er.dz8h-sbi8" _uuid="00000000-0000-0000-836F-8210FF2EA2A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73er.dz8h-sbi8"><intent_id>552243</intent_id><project_id>703178</project_id><text_data>This contract is for Landscape Maintenance at Stroll Garden and West Lake Sammamish Pkwy sites in the city of Redmond. This project to consist of weeding, trimming, edging, pruning, leaf fall &amp; litter removal on the sites. Equipment to be used includes weed eaters, pruning shears, back pack blowers(for cleanup), rakes, shovels, buckets &amp; hoes as required to complete the maintenance of the established planting areas for these City of Redmond sites.This service is on a set schedule weekly from April 1 through October 31 and bi-weekly for the months of November &amp; December.</text_data><comment_date>2013-01-16T00:00:00</comment_date></row><row _id="row-uikq~vtgk-nb8p" _uuid="00000000-0000-0000-A96F-9F97A86D7F7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uikq~vtgk-nb8p"><intent_id>641135</intent_id><project_id>739366</project_id><text_data>Add a receptacle and switch on IR cover with flexiable whip.  This is a personal single dwelling residence.</text_data><comment_date>2014-07-15T00:00:00</comment_date></row><row _id="row-5395.5mne.8gz8" _uuid="00000000-0000-0000-FC61-476948836838" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5395.5mne.8gz8"><intent_id>668079</intent_id><project_id>689965</project_id><text_data>Form Filed By: Victor Ometu</text_data><comment_date>2014-12-02T00:00:00</comment_date></row><row _id="row-rbmp-jcm4_vh9d" _uuid="00000000-0000-0000-6F75-133E8F4986E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rbmp-jcm4_vh9d"><intent_id>1178752</intent_id><project_id>979933</project_id><text_data>Project# 03370, Robinson, Phyllis, 1406 S Winter Rd, Spokane Valley, WA 99212</text_data><comment_date>2021-10-07T00:00:00</comment_date></row><row _id="row-7gnc-s492_44wf" _uuid="00000000-0000-0000-7345-DAF4FA5F772A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7gnc-s492_44wf"><intent_id>596457</intent_id><project_id>720084</project_id><text_data>PENSION - 5.50/HRHEALTH/WELFARE - 7.41/HRAPPRENTICESHIP - .69/HRSUBSTANCE ABUSE PROGRAM - .06/HRSTEP 1 APPRENTICE DOES NOT HAVE PENSION</text_data><comment_date>2013-09-27T00:00:00</comment_date></row><row _id="row-j4kr_fbus~zjgi" _uuid="00000000-0000-0000-8668-CCDAB4ECBE06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j4kr_fbus~zjgi"><intent_id>789517</intent_id><project_id>802539</project_id><text_data>From: ceep@clarkpud.com [mailto:ceep@clarkpud.com] Sent: Thursday, September 22, 2016 1:45 PMTo: Snyder, Leeann J (LNI) &amp;lt;bosn235@LNI.WA.GOV&amp;gt;Cc: Pearson, Reasa L (LNI) &amp;lt;notr235@LNI.WA.GOV&amp;gt;Subject: FW: Wrong contact name &amp; contract numberHello LeeAnn,Would it be possible to add in the notes section for the following:789517                 Hysmith                               9/15/2016           Intent Pending                 787860                 THORA CASEY                    9/8/2016             Intent Pending 662183                 PERDUE                                8/30/2016           Approved            Approved Affidavit          661935                 DELANEY                              8/29/2016           Approved            Approved Affidavit          658610                 PERDUE                                8/11/2016           Approved            Approved Affidavit          657989                 Genevase                            8/8/2016             Approved            Approved Affidavit          Billed657771                 Peggy McClellan               8/5/2016             Approved            Approved Affidavit          Billed657209                 STEIN TAMMY                   8/3/2016             Approved            Approved Affidavit          Billedthis amendment:�Contact correction to Debbie DePetris and contract correction to G003520.�per the contractor�s email below?Sincerely,AshleyAshley Spurgeon | Clark Public Utilities | Energy Services DepartmentProgram Coordinator | 360-992-3030 p | 360-992-3140 fFrom: Jon Peters [mailto:jon@taseca.com] Sent: Thursday, September 22, 2016 1:00 PMTo: Ashley SpurgeonCc: Trish Gayle PetersSubject: Wrong contact name &amp; contract numberHi Ashley,On these CEEP jobs we made the mistake of using the old �CEEP Team� as the contact name and the �G003300� as the contact number.Going forward I will submit the correct ones listed on the bid requests.  I apologize for our mistake.  Please let us know what we need to do to correct our error.789517                 Hysmith                               9/15/2016           Intent Pending                 787860                 THORA CASEY                    9/8/2016             Intent Pending 662183                 PERDUE                                8/30/2016           Approved            Approved Affidavit          661935                 DELANEY                              8/29/2016           Approved            Approved Affidavit          658610                 PERDUE                                8/11/2016           Approved            Approved Affidavit          657989                 Genevase                            8/8/2016             Approved            Approved Affidavit          Billed657771                 Peggy McClellan               8/5/2016             Approved            Approved Affidavit          Billed657209                 STEIN TAMMY                   8/3/2016             Approved            Approved Affidavit          BilledJon PetersTaseca WeatherizationHome Performance SpecialistsPO Box 2815Battle Ground, WA 98604Bus: 360-694-8451Cell: 360-798-1084Fax: 888-253-3357____________________________________________________________________________________________________________________________________________This email has been scanned by the Symantec Email Security.cloud service.For more information please visit http://www.symanteccloud.com_________________________________________________________________</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-7an2.vfqx_3zbg" _uuid="00000000-0000-0000-2D2B-ADC24ED86A33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7an2.vfqx_3zbg"><intent_id>1181437</intent_id><project_id>978182</project_id><comment_date>2021-09-29T00:00:00</comment_date></row><row _id="row-kknw-dzb9-8ktk" _uuid="00000000-0000-0000-A7EF-A034F79CFC19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kknw-dzb9-8ktk"><intent_id>710248</intent_id><project_id>767615</project_id><text_data>Install 2&amp;quot; topsoil, mulch, and sod.  Replace/repair existing irrigation.  Plant trees and shrubs.</text_data><comment_date>2015-07-27T00:00:00</comment_date></row><row _id="row-wdh8.5uce_twep" _uuid="00000000-0000-0000-2E1D-0A952A042265" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wdh8.5uce_twep"><intent_id>659043</intent_id><project_id>744112</project_id><text_data>THE OTHER TRUCK OCCUPATION IS FOR OUR SEMI TRUCK DRIVERS WHO WILL BE HAULING BARRIER ON THE PROJECT.</text_data><comment_date>2014-10-14T00:00:00</comment_date></row><row _id="row-69iv_mmeu-xr8g" _uuid="00000000-0000-0000-ADD1-4D2BD8B5C63D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-69iv_mmeu-xr8g"><intent_id>971033</intent_id><project_id>878185</project_id><text_data>1) fringe: 401K (1.80) + vac (1.00) + med (5.61) = $ 8.412) fringe: 401K (0.0) + vac (0.50) + med (0.0) = $ 0.503) fringe: 401K (1.53) + vac (1.50) + med (3.44) = $ 6.474) fringe: 401K (1.65) + vac (1.00) + med (2.67) = $ 5.325) fringe: 401K (2.10) + vac (2.00) + med (10.85) = $14.95</text_data><comment_date>2019-04-11T00:00:00</comment_date></row><row _id="row-tkx8-tsnz.dt8u" _uuid="00000000-0000-0000-E359-909E7E1745AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tkx8-tsnz.dt8u"><intent_id>520495</intent_id><project_id>669073</project_id><text_data>One owner/operator, one Journey Level Residential Soft Floor Layer and 3 laborers will be used on this project.</text_data><comment_date>2012-07-04T00:00:00</comment_date></row><row _id="row-8uwa.z9jm.bnt8" _uuid="00000000-0000-0000-7903-62BFF6719392" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8uwa.z9jm.bnt8"><intent_id>888828</intent_id><project_id>843996</project_id><text_data>Other Trucks are 4000 Gal Water Truck.</text_data><comment_date>2018-02-16T00:00:00</comment_date></row><row _id="row-m2x7.wyjh-2hxm" _uuid="00000000-0000-0000-A77C-E30310F0D7FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2x7.wyjh-2hxm"><intent_id>826563</intent_id><project_id>810453</project_id><text_data>1)Replace non-IC rated light fixtures2)yes3)one4)a: no, b: no, c: yes, d-k: no5)yes6)yes7)no8)no</text_data><comment_date>2017-04-13T00:00:00</comment_date></row><row _id="row-ptuz-iwwj.ub2w" _uuid="00000000-0000-0000-54BC-AC193541C5D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ptuz-iwwj.ub2w"><intent_id>1146369</intent_id><project_id>963291</project_id><text_data>Demolition of existing asphalt parking lot and construction of a new parking lot with new layout, parent drop-off, repositioned main entry from Upriver Drive and a new right turn only exit at the northeast corner. Work includes new parking lot lighting, drainage system and other work related to project. Tools/equipment  - dump trucks, loader, dozer, skid steers, mini hoe.</text_data><comment_date>2021-06-02T00:00:00</comment_date></row><row _id="row-ddpz_krmh-d43z" _uuid="00000000-0000-0000-9CFF-DF21FA93DC4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ddpz_krmh-d43z"><intent_id>847343</intent_id><project_id>815605</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. - General repairs #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment #3 - Including any basement or garage, how many stories or levels does the structure have? 2 stories #4 - What is the building used for? Apartment living units --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No (b) Any retail use in the structure? No(c) Permanent residence only? Yes (d) Rehabilitation house? No(e) Transitional housing? No (f) Communal dining facility? No (g) Treatment services? No(h) Assisted living services? No (I) Dormitories? No (j) Counseling? No (k) Is each room and/or bed in the structure rented separately? No (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? Yes #6 - Does each dwelling unit have its own bathroom? Yes #7 - Is there a community facility or manager�s office on site? Yes #8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2017-07-13T00:00:00</comment_date></row><row _id="row-qbkn.3s7r~ucc9" _uuid="00000000-0000-0000-1B9E-C5F37DD19DB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbkn.3s7r~ucc9"><intent_id>737074</intent_id><project_id>780512</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. - INSULATION IN RESIDENTIAL HOME#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? SINGLE FAMILY HOME#3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO&amp;#160;(e) Transitional housing?NO&amp;#160;(f) Communal dining facility?NO (g) Treatment services?&amp;#160;(h) Dormitories? NO(i) Counseling?NO&amp;#160;(j) Is each room and/or bed in the structure rented separately?NO (k) Other?&amp;#160;#5 - Does each dwelling unit have its own self-contained kitchen? yes#6 - Does each dwelling unit have its own bathroom? yes#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public?NO</text_data><comment_date>2015-12-10T00:00:00</comment_date></row><row _id="row-6pia_g7gh~tgsc" _uuid="00000000-0000-0000-9599-770BAC460C5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6pia_g7gh~tgsc"><intent_id>476025</intent_id><project_id>672392</project_id><text_data>Equipment &amp; tools:1.	Truck Driver-Driving Truck Mounted Hydro seeder and Skidster2.	Nozzle man-Spraying hydro mulch &amp; Operating Skidster3.	Landscape Laborer: Loading Seed, Fertilizer, Mulch into hand and cleaning.</text_data><comment_date>2011-09-01T00:00:00</comment_date></row><row _id="row-k7tf-7xtw~uakh" _uuid="00000000-0000-0000-F781-3CC276B8F402" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7tf-7xtw~uakh"><intent_id>1448415</intent_id><project_id>1115558</project_id><text_data>9943037 - Fire Sprinkler installation.</text_data><comment_date>2024-07-20T00:00:00</comment_date></row><row _id="row-4tgg_uq92-czqk" _uuid="00000000-0000-0000-A56C-3FAFB20F23F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4tgg_uq92-czqk"><intent_id>1154205</intent_id><project_id>967477</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2021-06-21T00:00:00</comment_date></row><row _id="row-8ukj-6dn2_kkg5" _uuid="00000000-0000-0000-BDA0-B99C3CBD7DF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ukj-6dn2_kkg5"><intent_id>940510</intent_id><project_id>854739</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER</text_data><comment_date>2018-10-18T00:00:00</comment_date></row><row _id="row-hpry~uccg.g8te" _uuid="00000000-0000-0000-4460-6CE63FA2635F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hpry~uccg.g8te"><intent_id>964888</intent_id><project_id>875398</project_id><text_data>0419014</text_data><comment_date>2019-03-13T00:00:00</comment_date></row><row _id="row-vp87.fu2i_h65i" _uuid="00000000-0000-0000-2396-7662CDBB8B6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vp87.fu2i_h65i"><intent_id>1148229</intent_id><project_id>963325</project_id><comment_date>2021-05-27T00:00:00</comment_date></row><row _id="row-398i~s88u-2r4h" _uuid="00000000-0000-0000-221E-854A8345AE57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-398i~s88u-2r4h"><intent_id>1289205</intent_id><project_id>1042306</project_id><text_data>Installation of insulation for single family residential homes.</text_data><comment_date>2022-12-12T00:00:00</comment_date></row><row _id="row-whyu.9i9z-t7xq" _uuid="00000000-0000-0000-21E9-229F324A46FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-whyu.9i9z-t7xq"><intent_id>637211</intent_id><project_id>737897</project_id><text_data>TELECOMMUNICATION TECHNICIANS WORK DESCRIPTIONProvide and install network and telephone cable between instruments, terminals and sets and the connections to the distribution cable.Provide and install Blocks and Subpanels where large feed cables terminate at the distribution frames in the IDF or MDFProvide and install riser cables between floors from the MDF to the IDFLabel and test the cableINDOOR INSTALLATION</text_data><comment_date>2014-06-25T00:00:00</comment_date></row><row _id="row-mkm3-iicc_pptn" _uuid="00000000-0000-0000-6D7C-473147E5CAE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mkm3-iicc_pptn"><intent_id>936599</intent_id><project_id>862835</project_id><text_data>Service Contract 301SCE808</text_data><comment_date>2018-10-01T00:00:00</comment_date></row><row _id="row-77cz-mqhq-87ha" _uuid="00000000-0000-0000-9187-FF988C28C28F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-77cz-mqhq-87ha"><intent_id>1194375</intent_id><project_id>988708</project_id><text_data>PREVENTATIVE MAINTENANCE ON RECIP COMPRESSOR. USED BASIC TOOLS/WRENCHES AND COMPANY PROVIDED TRUCK. INSTALLED NEW AIR FILTER, OIL AND TOOL OIL SAMPLE ON COMPRESSOR.</text_data><comment_date>2021-11-19T00:00:00</comment_date></row><row _id="row-bjf7_w7it-fnkh" _uuid="00000000-0000-0000-CA6D-2E8105F3CA41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjf7_w7it-fnkh"><intent_id>1166692</intent_id><project_id>964855</project_id><text_data>OTHER TRUCKS=LOWBOYOTHER TRUCKS=WATER TRUCKS</text_data><comment_date>2021-08-05T00:00:00</comment_date></row><row _id="row-6za6_zbs6~5ryh" _uuid="00000000-0000-0000-6C16-06C5FF5334BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6za6_zbs6~5ryh"><intent_id>731339</intent_id><project_id>773412</project_id><text_data>1065F-40108</text_data><comment_date>2015-11-12T00:00:00</comment_date></row><row _id="row-tiia~iphp~dqbp" _uuid="00000000-0000-0000-A896-EEA33FA140DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tiia~iphp~dqbp"><intent_id>974599</intent_id><project_id>816740</project_id><text_data>JW Fringe: NEBF $1.52, H&amp;W $9.15, Pension $8.38, 401K $2.00 JATC $0.68</text_data><comment_date>2019-04-29T00:00:00</comment_date></row><row _id="row-nmtb-f5qy~p2zg" _uuid="00000000-0000-0000-88E4-A2BF62210421" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nmtb-f5qy~p2zg"><intent_id>846238</intent_id><project_id>826652</project_id><text_data>Invoice #7295</text_data><comment_date>2017-07-10T00:00:00</comment_date></row><row _id="row-9ifb.83dg-7scj" _uuid="00000000-0000-0000-2329-E65219BE24ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ifb.83dg-7scj"><intent_id>1030262</intent_id><project_id>903797</project_id><text_data>SR# 45644670</text_data><comment_date>2020-01-07T00:00:00</comment_date></row><row _id="row-dyhh~3mpk.btsn" _uuid="00000000-0000-0000-D243-23AF848C43F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dyhh~3mpk.btsn"><intent_id>804847</intent_id><project_id>808312</project_id><text_data>Checked dishwasher found that the pump had tripped the overload. Reset and checked operation.</text_data><comment_date>2016-11-30T00:00:00</comment_date></row><row _id="row-ssng_hurj_suyj" _uuid="00000000-0000-0000-E4BA-4ECE9D2139D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ssng_hurj_suyj"><intent_id>1073387</intent_id><project_id>925977</project_id><text_data>9851013</text_data><comment_date>2020-07-20T00:00:00</comment_date></row><row _id="row-bvkq.aekk~647b" _uuid="00000000-0000-0000-5655-900A10327C73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bvkq.aekk~647b"><intent_id>807393</intent_id><project_id>807225</project_id><text_data>Filed by Kym RehakProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2016-12-15T00:00:00</comment_date></row><row _id="row-w3v8.5eqz~ha45" _uuid="00000000-0000-0000-5413-899310FFC3F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w3v8.5eqz~ha45"><intent_id>729108</intent_id><project_id>775736</project_id><text_data>contract consists of furnishing all labor, tools, material, and equipment necessary for the construction and preparation of five (5) small rain gardens and one above ground cistern system on private properties in one, City-selected Kirkland neighborhood installation of soil, amending soil and replacing soil, using single axle landscape truck and mini excavator, wheel barrows and hand tools.</text_data><comment_date>2015-10-30T00:00:00</comment_date></row><row _id="row-mtec_9rvg~zevp" _uuid="00000000-0000-0000-2DD9-6697C65D0B21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mtec_9rvg~zevp"><intent_id>1182180</intent_id><project_id>972932</project_id><text_data>Floform has been instructed by L &amp; I to add the trade 'Truck Driver - Other Trucks' to our scope to cover transportation of the finished countertops from our factory in Kent to the jobsite.  The lead installer is the driver and the vehicle is a Ford Transit van.</text_data><comment_date>2021-10-08T00:00:00</comment_date></row><row _id="row-ucjf_2b5q.qegt" _uuid="00000000-0000-0000-93CB-9FE26351A036" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ucjf_2b5q.qegt"><intent_id>907819</intent_id><project_id>840238</project_id><text_data>Providing the beautification on an area adjacent to the roadway using a blower/mulch truck</text_data><comment_date>2018-05-30T00:00:00</comment_date></row><row _id="row-wtjv-3fgr.5khz" _uuid="00000000-0000-0000-CC0A-C20C9431545E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wtjv-3fgr.5khz"><intent_id>1099733</intent_id><project_id>937418</project_id><text_data>Trucks are 3,000 gallon truck mounted hydroseeders and 3,000 gallon water trucks</text_data><comment_date>2020-10-29T00:00:00</comment_date></row><row _id="row-r9g2.gcq2-sinp" _uuid="00000000-0000-0000-DCBD-622C175092CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9g2.gcq2-sinp"><intent_id>1126876</intent_id><project_id>953233</project_id><text_data>The delay in completing training was due to a change in the scope of work regarding insurance claims. We are now only performing demolition services.</text_data><comment_date>2021-03-16T00:00:00</comment_date></row><row _id="row-d2c7-t6ad_bmpf" _uuid="00000000-0000-0000-C478-D97D528F696D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d2c7-t6ad_bmpf"><intent_id>781079</intent_id><project_id>799287</project_id><text_data>Other trucks will be a 4000 gallon water truck used onsite.</text_data><comment_date>2016-08-15T00:00:00</comment_date></row><row _id="row-rain_nsmy~fxqk" _uuid="00000000-0000-0000-8732-AAAD6FE8E417" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rain_nsmy~fxqk"><intent_id>637897</intent_id><project_id>738171</project_id><text_data>1)We were contracted to replace a gas furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2014-06-27T00:00:00</comment_date></row><row _id="row-4g4b.e5av.xq2t" _uuid="00000000-0000-0000-0D1F-0518558FFEF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4g4b.e5av.xq2t"><intent_id>801297</intent_id><project_id>807172</project_id><text_data>J16-11737</text_data><comment_date>2016-11-14T00:00:00</comment_date></row><row _id="row-q5xm.cgpx_f5zz" _uuid="00000000-0000-0000-787F-9AF3FF896B14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5xm.cgpx_f5zz"><intent_id>952675</intent_id><project_id>869589</project_id><text_data>Discovered this of two (other is Feeder #2619) was never entered when work started back in year 2017 as part of the same contract for the 5-year (now 6th year) SCL&amp;#39;s Powerline Clearance Program.</text_data><comment_date>2018-12-28T00:00:00</comment_date></row><row _id="row-nku6_m775_see5" _uuid="00000000-0000-0000-1CA6-9FC0EE81DA14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nku6_m775_see5"><intent_id>1277518</intent_id><project_id>1036899</project_id><text_data>9891234</text_data><comment_date>2022-10-25T00:00:00</comment_date></row><row _id="row-y64n-tdrk.dsgh" _uuid="00000000-0000-0000-5746-43F0D7FF209C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y64n-tdrk.dsgh"><intent_id>1271579</intent_id><project_id>1033729</project_id><text_data>IFS WO# 129073, King County Library Kenmore #1290, Valve Replacement, existing irrigation system.</text_data><comment_date>2022-10-03T00:00:00</comment_date></row><row _id="row-t3mq-9d2q_ed83" _uuid="00000000-0000-0000-4969-F2FF11B7A785" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3mq-9d2q_ed83"><intent_id>839058</intent_id><project_id>811759</project_id><text_data>BianchiDemaesschalckFitzpatrick1. Mechanical ventilation	2. Single family		3. 1		4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No		5. Yes		6. Yes		7. No		8. No</text_data><comment_date>2017-06-07T00:00:00</comment_date></row><row _id="row-zev6_7zqa.r5gh" _uuid="00000000-0000-0000-9715-CBD5B2B6A6F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zev6_7zqa.r5gh"><intent_id>710020</intent_id><project_id>768318</project_id><text_data>Corrected Industrial Insurance Number</text_data><comment_date>2015-07-28T00:00:00</comment_date></row><row _id="row-mwch.s2zt.e7ba" _uuid="00000000-0000-0000-4F78-C2CA8A3E37E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mwch.s2zt.e7ba"><intent_id>722158</intent_id><project_id>772982</project_id><text_data>Supply bark to school</text_data><comment_date>2015-09-22T00:00:00</comment_date></row><row _id="row-9477.nk2z_a7dy" _uuid="00000000-0000-0000-F90B-F7E0D812DAD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9477.nk2z_a7dy"><intent_id>1054087</intent_id><project_id>914087</project_id><text_data>WagesWe had our Chief Superintendent Plumber (CSP) and a helper perform the work. The CSP's wage rate is $57.69/hr ($120,000 per annum). His benefit breaks down as: Medical $15.54, Vacation $3.66, Holiday $1.68, Life AD&amp;D and LTD $0.48, for a total fringe of $21.39.Work Performed#1 - Describe the work that your firm was contracted to performExisting 3-Story Wood Frame Structure containing 16 residential units. Project consist of replacement of shingle roof, windows, Doors, WRB and exterior siding and trim. Site Improvements include fencing, relocation of sewer, parking restriping, updated fire alarm and addition of fire sprinkler system.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?Apartment#3 - Including any basement or garage, how many stories or levels does the structure have?3 stories#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure?No(b) Any retail use in the structure?No(c) Permanent residence only?Yes(d) Rehabilitation house?No(e) Transitional housing?No(f) Communal dining facility?No(g) Treatment services?No(h) Assisted living services?No(I) Dormitories?No(j) Counseling?No(k) Is each room and/or bed in the structure rented separately?Yes(l) Other? #5 - Does each dwelling unit have its own self-contained kitchen?Yes#6 - Does each dwelling unit have its own bathroom?Yes#7 - Is there a community facility or manager�s office on site?Yes#8 - Is any part of the structure used by members of the publicNo ?</text_data><comment_date>2020-05-05T00:00:00</comment_date></row><row _id="row-fz2e~atg5_84ib" _uuid="00000000-0000-0000-0E93-C4C47231964A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fz2e~atg5_84ib"><intent_id>628145</intent_id><project_id>730544</project_id><text_data>Laborer - use of shovel and clean up workOther Trucks - 0 to 8,000 gallon water truck used for dust control</text_data><comment_date>2014-05-06T00:00:00</comment_date></row><row _id="row-uxp3.ywgy~ewjs" _uuid="00000000-0000-0000-899A-B5D976B9B1DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uxp3.ywgy~ewjs"><intent_id>578240</intent_id><project_id>709980</project_id><text_data>1113043</text_data><comment_date>2013-06-28T00:00:00</comment_date></row><row _id="row-7uds_c8mh~fne8" _uuid="00000000-0000-0000-0F30-090EA9A1A52E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7uds_c8mh~fne8"><intent_id>534530</intent_id><project_id>695954</project_id><text_data>Motor Patrol Grader Finisher Rate Is Used For Vac Truck Operator (As Per Your Instructions)</text_data><comment_date>2012-09-14T00:00:00</comment_date></row><row _id="row-55e6_5dxn-g94a" _uuid="00000000-0000-0000-0200-BFB75DC10B78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-55e6_5dxn-g94a"><intent_id>1142882</intent_id><project_id>958328</project_id><text_data>Job# 04095S</text_data><comment_date>2021-05-07T00:00:00</comment_date></row><row _id="row-wg7h~2xps.apgb" _uuid="00000000-0000-0000-3203-E4D24FA8CF2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wg7h~2xps.apgb"><intent_id>1057710</intent_id><project_id>908337</project_id><text_data>Our company installs high speed, cold storage and overhead doors.</text_data><comment_date>2020-05-13T00:00:00</comment_date></row><row _id="row-huya_8afp_msk8" _uuid="00000000-0000-0000-ACAD-1380AA8AEA5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-huya_8afp_msk8"><intent_id>1106212</intent_id><project_id>941503</project_id><text_data>1006868</text_data><comment_date>2020-11-30T00:00:00</comment_date></row><row _id="row-z6gc-8chc_ekyh" _uuid="00000000-0000-0000-3B4E-0F1CE0323C62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z6gc-8chc_ekyh"><intent_id>815598</intent_id><project_id>813293</project_id><text_data>Employee Only Ironworker Fringe Breakdown:Medical/Vision/RX Insurance:$2.56Dental Insurance:$.21Life Insurance:$.01Pension Plan:$21.78</text_data><comment_date>2017-02-13T00:00:00</comment_date></row><row _id="row-kg94_55ke_u256" _uuid="00000000-0000-0000-22C6-F8A1CBF8122B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kg94_55ke_u256"><intent_id>819328</intent_id><project_id>788810</project_id><text_data>Filed by Chelsea SmithProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2017-03-07T00:00:00</comment_date></row><row _id="row-yqfc_jemu_y375" _uuid="00000000-0000-0000-CAA1-C0EC87CA7867" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yqfc_jemu_y375"><intent_id>914351</intent_id><project_id>846599</project_id><text_data>GU Job #18148Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2018-06-27T00:00:00</comment_date></row><row _id="row-ktxg.6hrc~qnuk" _uuid="00000000-0000-0000-6AC2-C6DE5B57DA3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ktxg.6hrc~qnuk"><intent_id>487395</intent_id><project_id>671983</project_id><text_data>Fringe Breakdown - Roofer amount of 6.57; Health Insurance 2.05 pr hr &amp; Davis Bacon Pension Fund 4.52 pr hr.Sheetmetal Fringe amount of 8.91; Halth Insurance 2.05 pr hr &amp; Davis Bacon Pension Fund 6.86 pr hr</text_data><comment_date>2011-11-08T00:00:00</comment_date></row><row _id="row-wc8m_vf8t-v4rx" _uuid="00000000-0000-0000-D425-67D3659A41E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wc8m_vf8t-v4rx"><intent_id>631449</intent_id><project_id>735484</project_id><text_data>We will be using sub-contractors to do portions of this work.</text_data><comment_date>2014-05-30T00:00:00</comment_date></row><row _id="row-cyec.y9m3~7ien" _uuid="00000000-0000-0000-8DD4-596EA4B0EADA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cyec.y9m3~7ien"><intent_id>1244452</intent_id><project_id>997644</project_id><text_data>the fringe benefit package listed totals $23.42 and the breakdown of that total amount is $.17 medical, $.1.50 retirement, $19.35 prevailing wage adjustment, $.96 vacation, $.1.44 holiday.</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-umnx.ewbz.h8t6" _uuid="00000000-0000-0000-EBBD-FAC2BBC2D895" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-umnx.ewbz.h8t6"><intent_id>637420</intent_id><project_id>653970</project_id><text_data>Form filed by: David Clavel</text_data><comment_date>2014-06-25T00:00:00</comment_date></row><row _id="row-d78f-cjvh~emp9" _uuid="00000000-0000-0000-5626-1EF1372AF9F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d78f-cjvh~emp9"><intent_id>486283</intent_id><project_id>674857</project_id><text_data>Health&amp;Welfare = 5.50Pension = 6.10Ind. stabilization/Promotion fund = .23Training = .34LEBPCT/EUCA = .15Cash fring paid directly to employee = 2.73</text_data><comment_date>2011-11-01T00:00:00</comment_date></row><row _id="row-4zjc-ibys_hv8r" _uuid="00000000-0000-0000-4938-A96F538A27D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4zjc-ibys_hv8r"><intent_id>1256252</intent_id><project_id>1025617</project_id><text_data>SPM #27061</text_data><comment_date>2022-08-09T00:00:00</comment_date></row><row _id="row-rpfv~7rqn-fhek" _uuid="00000000-0000-0000-D4F7-7ACA8F2B3D1F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rpfv~7rqn-fhek"><intent_id>840616</intent_id><project_id>824396</project_id><text_data>Encampment and litter clean-up at designated sites.</text_data><comment_date>2017-06-14T00:00:00</comment_date></row><row _id="row-jii9-gc66_73aa" _uuid="00000000-0000-0000-FE4F-71A1E0613CF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jii9-gc66_73aa"><intent_id>562325</intent_id><project_id>706862</project_id><text_data>Beautification of area adjacent to roadway and levee through the installation of grass, topsoil, trees and bark mulch.Equipment: Hydroseeder, hand tools</text_data><comment_date>2013-03-29T00:00:00</comment_date></row><row _id="row-wmpv-cq73.yb22" _uuid="00000000-0000-0000-9C78-DF83010F0854" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wmpv-cq73.yb22"><intent_id>549610</intent_id><project_id>701980</project_id><text_data>It appears your company may not be properly calculating worker fringe benefits. By separate email we have sent you a document that explains the benefits calculation process acceptable to the department. Please review that document and adjust your procedures as necessary. Approval of this form does not constitute approval of the methodology your company is using in determining the amount of such contributions. We reserve the right to investigate further the issue on this and future forms that your company submits on which the benefits calculation appears erroneous. If you have questions, please contact Marcus Ehrlander at (360) 902-5334 or marcus.ehrlander@Lni.wa.gov.</text_data><comment_date>2013-01-17T00:00:00</comment_date></row><row _id="row-4xme_bxfp-w42t" _uuid="00000000-0000-0000-C0AB-C73313445C58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4xme_bxfp-w42t"><intent_id>1073643</intent_id><project_id>926107</project_id><text_data>Original evaluation completed during preventative maintenance not completed 07.16.2020, order number 0181565.Make/Model: Marathon RJ250SLHT 20YD CompactorSerial Number: 53035210Approved quote to remove and replace one internal hydraulic line and refill oil reservoir. Includes:- Relocating compactor away from dock to gain access to hydraulic lines- Remove and replace one 32' hydraulic line- Refill oil reservoir- Finish completing compactor preventative maintenance (billed to work order 0181565, per the preventative maintenance agreement.)- Return unit to dock area once repairs are complete- Environmental/consumable charge- COVID-19 Personal Protection Equipment- Labor, portal to portal- Zone charge.</text_data><comment_date>2020-07-20T00:00:00</comment_date></row><row _id="row-9dqc.fuht-u5xu" _uuid="00000000-0000-0000-FEBB-18997FA32C5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9dqc.fuht-u5xu"><intent_id>968884</intent_id><project_id>877268</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Weatherization on low-income homes. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? single Family #3 - Including any basement or garage, how many stories or levels does the structure have?generally 1 level #4 - What is the building used for? Residential --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no (b) Any retail use in the structure? no (c) Permanent residence only? yes (d) Rehabilitation house?no (e) Transitional housing? no (f) Communal dining facility? no (g) Treatment services? no (h) Assisted living services? no (I) Dormitories?no (j) Counseling? no (k) Is each room and/or bed in the structure rented separately?n/a (l) Other? n/a #5 - Does each dwelling unit have its own self-contained kitchen? yes #6 - Does each dwelling unit have its own bathroom? yes #7 - Is there a community facility or manager�s office on site? no #8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2019-05-07T00:00:00</comment_date></row><row _id="row-9426_hnzh.xccp" _uuid="00000000-0000-0000-1E0D-D78859E4FC86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9426_hnzh.xccp"><intent_id>560299</intent_id><project_id>706886</project_id><text_data>Hos job # 1755, --Limited public works project.</text_data><comment_date>2013-03-15T00:00:00</comment_date></row><row _id="row-93q5.rnqc-3r6h" _uuid="00000000-0000-0000-6047-DF7B63805835" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-93q5.rnqc-3r6h"><intent_id>664239</intent_id><project_id>747085</project_id><text_data>2500 hundred water truck ( watering site for dust control)</text_data><comment_date>2014-11-14T00:00:00</comment_date></row><row _id="row-bgwf_tn2e.mkfv" _uuid="00000000-0000-0000-BECE-0B56A5517A53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bgwf_tn2e.mkfv"><intent_id>560016</intent_id><project_id>702502</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-04-19T00:00:00</comment_date></row><row _id="row-rzwc.525n-v92k" _uuid="00000000-0000-0000-0C90-5CD024B759C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzwc.525n-v92k"><intent_id>680939</intent_id><project_id>740932</project_id><text_data>Provide and install cat6 cabling for wireless access points. Terminate in the nearest MDF or IDF. All cabling will be run indoors.</text_data><comment_date>2015-02-25T00:00:00</comment_date></row><row _id="row-nuzi-5gwa~3uk3" _uuid="00000000-0000-0000-8A40-9614041C5182" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nuzi-5gwa~3uk3"><intent_id>524894</intent_id><project_id>689539</project_id><text_data>duties to be performed by laborer:maskingpulling hosecleaning</text_data><comment_date>2012-08-03T00:00:00</comment_date></row><row _id="row-6ib3-83t3~mxgc" _uuid="00000000-0000-0000-F04C-9C66B3FDF29D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ib3-83t3~mxgc"><intent_id>1153985</intent_id><project_id>967368</project_id><text_data>This is the third year of a three year on call small works agreement with the city of Shoreline</text_data><comment_date>2021-06-20T00:00:00</comment_date></row><row _id="row-6qk2.r5ti.mtri" _uuid="00000000-0000-0000-439C-2DC1C95F60C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6qk2.r5ti.mtri"><intent_id>587884</intent_id><project_id>706419</project_id><text_data>Hydroseeding for beautification of lawns</text_data><comment_date>2013-08-15T00:00:00</comment_date></row><row _id="row-f9yv-984p-erum" _uuid="00000000-0000-0000-C4FA-613DEE2FC1AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f9yv-984p-erum"><intent_id>627085</intent_id><project_id>733532</project_id><text_data>Installing metal rack systems. No equipment being used</text_data><comment_date>2014-04-30T00:00:00</comment_date></row><row _id="row-k997_hwes-5agy" _uuid="00000000-0000-0000-B9E5-A1F5B3A6CA5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k997_hwes-5agy"><intent_id>1195244</intent_id><project_id>932959</project_id><text_data>Air &amp; Lube Systems' Millwrights will be installing a bus wash system, pressure washer system, an 80,000 lbs bus lift, mobile fare collection system with vaults, storage equipment (cabinets, shelving, etc.), and vacuum system.  Equipment utilized to install the aforementioned systems include forklifts and a wide variety of hand tools.</text_data><comment_date>2021-12-12T00:00:00</comment_date></row><row _id="row-rkpj.ny9f_h3b2" _uuid="00000000-0000-0000-70F4-8C1FBC98F2CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rkpj.ny9f_h3b2"><intent_id>620962</intent_id><project_id>730998</project_id><text_data>JOB 42291</text_data><comment_date>2014-03-19T00:00:00</comment_date></row><row _id="row-4ghc~8sjf-swk7" _uuid="00000000-0000-0000-EE35-3062A3EA00A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ghc~8sjf-swk7"><intent_id>1054167</intent_id><project_id>917102</project_id><text_data>SC 200304-0026</text_data><comment_date>2020-04-27T00:00:00</comment_date></row><row _id="row-sqdn_29f2.qa5q" _uuid="00000000-0000-0000-7B51-319B87525F80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqdn_29f2.qa5q"><intent_id>494098</intent_id><project_id>455947</project_id><text_data>Painters to apply Raven 405 inside manholes</text_data><comment_date>2011-12-20T00:00:00</comment_date></row><row _id="row-azix-9qtf.mr62" _uuid="00000000-0000-0000-6419-683ED09869D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-azix-9qtf.mr62"><intent_id>1197745</intent_id><project_id>990704</project_id><text_data>Personal sprays liquid mix of herbicide on bare ground to prevent vegetation growth</text_data><comment_date>2021-12-30T00:00:00</comment_date></row><row _id="row-w9c5.xtme-phg2" _uuid="00000000-0000-0000-A748-3B477A1FF8AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9c5.xtme-phg2"><intent_id>502826</intent_id><project_id>667456</project_id><text_data>Form filed by: Jay McCarthy</text_data><comment_date>2012-03-06T00:00:00</comment_date></row><row _id="row-sysp~bcf3-pejy" _uuid="00000000-0000-0000-8D0D-AC8C1403A26F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sysp~bcf3-pejy"><intent_id>859118</intent_id><project_id>829781</project_id><text_data>Robert Turpaud is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing new bathroom fans. This job meets the residential job requirements.</text_data><comment_date>2017-08-29T00:00:00</comment_date></row><row _id="row-9w2y_7gxy~yzu3" _uuid="00000000-0000-0000-3EC6-66C3DC377BD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9w2y_7gxy~yzu3"><intent_id>1087813</intent_id><project_id>923692</project_id><text_data>cabling for telephones and computers.  Cables will run indoors.  Terminate, test and label.</text_data><comment_date>2020-09-14T00:00:00</comment_date></row><row _id="row-vsmw_je5t.kxtf" _uuid="00000000-0000-0000-3A13-DABD3AF6132C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vsmw_je5t.kxtf"><intent_id>955077</intent_id><project_id>870117</project_id><text_data>PROJECT REQUIRES ENGINEERED WOOD FIBER MATERIAL TO BE INSTALLED.  WE SUB CONTRACT AN INSTALLER TO INSTALL THE MATERIAL VIA BLOWER TRUCK.</text_data><comment_date>2019-01-15T00:00:00</comment_date></row><row _id="row-5y3x~ydck-cfvw" _uuid="00000000-0000-0000-9B83-20CE85CFD2AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5y3x~ydck-cfvw"><intent_id>570600</intent_id><project_id>711428</project_id><text_data>Form filed by: Ronald Jackson</text_data><comment_date>2013-05-20T00:00:00</comment_date></row><row _id="row-hg4y_i7gm_7p8i" _uuid="00000000-0000-0000-A17A-8CE3BB06A4F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hg4y_i7gm_7p8i"><intent_id>544393</intent_id><project_id>573706</project_id><text_data>Placing Acrylic Tennis Court Surfacing Materials by mixing paint with sand and water with a drill paddle and pouring the mixed material out of a wheelbarrow and spreading with a squeege. Painting Lines with a 4&amp;quot; Paint Roller.</text_data><comment_date>2012-11-16T00:00:00</comment_date></row><row _id="row-apy4.3z69~hc6q" _uuid="00000000-0000-0000-3EF5-D893AF47A213" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-apy4.3z69~hc6q"><intent_id>1416329</intent_id><project_id>1118515</project_id><text_data>WO# 207478 COB MeydenbauerRemove concrete patio by cutting and hauling away by hand</text_data><comment_date>2024-04-04T00:00:00</comment_date></row><row _id="row-cybj~2ceq_86nv" _uuid="00000000-0000-0000-F7B9-117594D2D9BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cybj~2ceq_86nv"><intent_id>751728</intent_id><project_id>787376</project_id><text_data>Weekly Lawn Mowing. Use of mowers, weed eaters, blowers.</text_data><comment_date>2016-03-16T00:00:00</comment_date></row><row _id="row-p36v.fn9i~7c87" _uuid="00000000-0000-0000-11D4-E3A6B8FD6609" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p36v.fn9i~7c87"><intent_id>1200453</intent_id><project_id>975861</project_id><text_data>I will do each personal fringe against their wages</text_data><comment_date>2021-12-20T00:00:00</comment_date></row><row _id="row-ekwn.xwd8.3xgj" _uuid="00000000-0000-0000-956E-431506A4028F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ekwn.xwd8.3xgj"><intent_id>1052614</intent_id><project_id>916309</project_id><text_data>1120014</text_data><comment_date>2020-04-20T00:00:00</comment_date></row><row _id="row-9at9_fnyw_sv3j" _uuid="00000000-0000-0000-C2B5-CBB4DDD132C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9at9_fnyw_sv3j"><intent_id>657079</intent_id><project_id>732756</project_id><text_data>Form filed by: Levi B Haywood</text_data><comment_date>2014-09-26T00:00:00</comment_date></row><row _id="row-deny_fmqy.8st5" _uuid="00000000-0000-0000-F5A7-10F70285341A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-deny_fmqy.8st5"><intent_id>1154727</intent_id><project_id>967714</project_id><text_data>I am Only building the rack.  I do not know of any other work being performed onsite.  No Vehicles.  Using Roto hammers, Vacuums, impacts and hammers.  I wish there was a option for warehouse rack installation.</text_data><comment_date>2021-07-06T00:00:00</comment_date></row><row _id="row-baqv-5d2u.vuip" _uuid="00000000-0000-0000-9316-C82FD80666E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-baqv-5d2u.vuip"><intent_id>678259</intent_id><project_id>744944</project_id><text_data>Oregon Employees Only - SAIF 811528</text_data><comment_date>2015-02-06T00:00:00</comment_date></row><row _id="row-hv4a_hf6k~zvcd" _uuid="00000000-0000-0000-96AA-657CCE198CDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hv4a_hf6k~zvcd"><intent_id>1067831</intent_id><project_id>914185</project_id><text_data>Correct UBI 602418849</text_data><comment_date>2022-04-21T00:00:00</comment_date></row><row _id="row-i44z~9cfe~8vnp" _uuid="00000000-0000-0000-0540-49F5BEF8EC46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i44z~9cfe~8vnp"><intent_id>977962</intent_id><project_id>874135</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.residential construction #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? yes #3 - Including any basement or garage, how many stories or levels does the structure have?  1 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no (b) Any retail use in the structure? no (c) Permanent residence only? yes (d) Rehabilitation house? no (e) Transitional housing? no (f) Communal dining facility? no (g) Treatment services? no (h) Assisted living services? no (I) Dormitories? no (j) Counseling? no (k) Is each room and/or bed in the structure rented separately? yes (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? yes #6 - Does each dwelling unit have its own bathroom? no #7 - Is there a community facility or manager�s office on site? no #8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2019-05-14T00:00:00</comment_date></row><row _id="row-fyss~wc3b.2tjr" _uuid="00000000-0000-0000-65FA-47DB71D74D9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fyss~wc3b.2tjr"><intent_id>1028206</intent_id><project_id>902689</project_id><text_data>All work will be performed by subcontractors, except for possible punch-list items and possible site clean-up.</text_data><comment_date>2019-12-20T00:00:00</comment_date></row><row _id="row-264p~nk94-f4y3" _uuid="00000000-0000-0000-1F85-38FAAC05E72F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-264p~nk94-f4y3"><intent_id>1263819</intent_id><project_id>1009276</project_id><text_data>GU Job #22333Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2022-09-02T00:00:00</comment_date></row><row _id="row-qc72.tqgb-acvj" _uuid="00000000-0000-0000-D7F9-641C6FDDF823" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qc72.tqgb-acvj"><intent_id>1174032</intent_id><project_id>977541</project_id><text_data>PTI So 162720</text_data><comment_date>2021-08-31T00:00:00</comment_date></row><row _id="row-iawc-2prx-wuzu" _uuid="00000000-0000-0000-2C15-F0986F4A2004" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iawc-2prx-wuzu"><intent_id>1205133</intent_id><project_id>989985</project_id><text_data>We are based in Gresham, Oregon, so we have our Worker's Compensation insurance through Saif, policy #926498.</text_data><comment_date>2022-01-17T00:00:00</comment_date></row><row _id="row-hkea~rwwb~e96r" _uuid="00000000-0000-0000-CFC7-395464B2E6DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hkea~rwwb~e96r"><intent_id>647461</intent_id><project_id>741659</project_id><text_data>TELECOMMUNICATION TECHNICIANS WORK DESCRIPTIONPROVIDE AND INSTALL NETWORK AND TELEPHONE CABLE BETWEEN INSTRUMENTS, TERMINALS AND SETS AND THE CONNECTIONS TO DISTRIBUTE CABLE.PROVIDE AND INSTALL BLOCKS AND SUBPANELS WHERE LARGE FEED CABLES TERMINATE AT THE DISTRIBUTION FRAMES IN THE IDF OR MDF.PROVIDE AND INSTALL RISER CABLES BETWEEN FLOORS FROM THE MDF TO THE IDF.LABEL AND TEST THE CABLE.INDOOR INSTALLATION</text_data><comment_date>2014-08-12T00:00:00</comment_date></row><row _id="row-pr8i-swxc.qajj" _uuid="00000000-0000-0000-4740-3165D7F796D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pr8i-swxc.qajj"><intent_id>690881</intent_id><project_id>758356</project_id><text_data>Filed by Steven TranProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2015-04-24T00:00:00</comment_date></row><row _id="row-p3sy_n53c.rfm9" _uuid="00000000-0000-0000-D845-A75ED934DEA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p3sy_n53c.rfm9"><intent_id>681515</intent_id><project_id>729656</project_id><text_data>PCI JOB # 6668FRINGE - H&amp;W $10.59, PEN $7.81, OTHER 1.42</text_data><comment_date>2015-03-02T00:00:00</comment_date></row><row _id="row-hqb5-phys-y2ai" _uuid="00000000-0000-0000-E0E8-AB354778C298" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hqb5-phys-y2ai"><intent_id>1264560</intent_id><project_id>1029895</project_id><text_data>1. Weatherize Home2.Single Family Dwelling3.One Level4. a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no l.no5. yes6.yes7.no8.no</text_data><comment_date>2022-09-07T00:00:00</comment_date></row><row _id="row-5ve8-yiag.nvut" _uuid="00000000-0000-0000-8C81-3BF2D262039C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ve8-yiag.nvut"><intent_id>545787</intent_id><project_id>697564</project_id><text_data>Truck Driver will be driving a 3000 gal truck mounted hydroseeder</text_data><comment_date>2012-11-26T00:00:00</comment_date></row><row _id="row-gzjr_bscu.5z9p" _uuid="00000000-0000-0000-75F6-B179F265AB43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzjr_bscu.5z9p"><intent_id>790925</intent_id><project_id>802311</project_id><text_data>Blythe job # T-807</text_data><comment_date>2016-09-21T00:00:00</comment_date></row><row _id="row-n64c-am94~5h6f" _uuid="00000000-0000-0000-84F5-24FFE3FB3175" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n64c-am94~5h6f"><intent_id>1184311</intent_id><project_id>982969</project_id><text_data>Lynnwood Public Facilities District -Remove &amp; Spray Knotweed WO#89692Monarch Landscape proposes to do the following:�	To remove and spray the Knotweed that is located along the Addecott Fence Line.�	Cleanup and remove any work related debris.</text_data><comment_date>2021-10-08T00:00:00</comment_date></row><row _id="row-eiz4-4zyv_9kpt" _uuid="00000000-0000-0000-546C-A5F485F01143" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eiz4-4zyv_9kpt"><intent_id>664563</intent_id><project_id>745876</project_id><text_data>301845</text_data><comment_date>2014-11-07T00:00:00</comment_date></row><row _id="row-hzxw_xukb~crpt" _uuid="00000000-0000-0000-21D1-39EAF221902D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hzxw_xukb~crpt"><intent_id>689354</intent_id><project_id>756751</project_id><text_data>Truck Drivers are 10 to 12 yard end dump trucks, they haul rock and asphalt for paving and road construction.  Truck and pup drivers haul 20 to 24 yards.  They are also end dump and haul rock and asphalt for highway paving and road construction</text_data><comment_date>2015-04-16T00:00:00</comment_date></row><row _id="row-r62f~4p4s.d227" _uuid="00000000-0000-0000-89AF-E2E9D624CAE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r62f~4p4s.d227"><intent_id>513199</intent_id><project_id>688130</project_id><text_data>LEI#254012</text_data><comment_date>2012-05-22T00:00:00</comment_date></row><row _id="row-r5qv_69k7~s39n" _uuid="00000000-0000-0000-0F1C-E5B20E0C5DC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5qv_69k7~s39n"><intent_id>1097694</intent_id><project_id>934767</project_id><text_data>1Kathy BuchansFrom: Jameson, Jesse (LNI) &amp;lt;JAJC235@LNI.WA.GOV&amp;gt;Sent: Thursday, September 26, 2019 10:14 AMTo: Kathy BuchansSubject: RE: A-Gas US Inc. dba Rapid Recovery (UBI : 604 390 835)Hi KathyThe recovery or withdrawal only, of refrigerant from cooling equipment where the recovery process is performed byconnecting to an existing valve in the cooling system designed for that purpose, is exempt from contractor registration.Feel free to forward this email to Prevailing WageJesse L JamesonTechnical SpecialistConstruction Contractor Compliance12806 Gateway Dr S, Tukwila WA. 98168206-835-1107From: Kathy Buchans &amp;lt;Kathy.Buchans@raprec.com&amp;gt;Sent: Thursday, September 26, 2019 10:02 AMTo: Jameson, Jesse (LNI) &amp;lt;JAJC235@LNI.WA.GOV&amp;gt;Subject: A-Gas US Inc. dba Rapid Recovery (UBI : 604 390 835)Hello JessieThank you for talking my call. As you have requested, below is a synopsis of our scope of workas it relates to work being performed within the State of Washington. We were operatingunder UBI 603 125 737 as RapRec, Inc (Rapid Recovery). However, we were bought by A-GasUS Inc. several years ago and the correct UBI we should be utilizing is 604 390 855. Althoughwe are in a good position with the Dept of Revenue and Dept of Licensing, apparently we arenot correctly registered as a Contractor under this UBI. Hence, the reason we need identifywhat is further required of us, or not required of us, in order to appropriately use UBI 604 390855 for prevailing wage jobs.2A-Gas US Inc. (dba Rapid Recovery) is a subcontractor to a general, prime, or main contractor,and performing refrigerant abatement services under provisions set forth by the EnvironmentalProtection Agency under Section 608 of the Clean Air Act. Per the Clean Air Act all refrigerantmust be safely abated during the maintenance, service, repair, or disposal of air-conditioningand refrigeration equipment. Rapid Recovery does not perform any additional services otherthan recovering gas from units; we are not in the business of maintenance, service, repair, ordisposal.Again, thank you for your time, and I look forward to your response.KathyKathy BuchansContracts AdministratorT: 623-383-29648932 West Cactus Road, Peoria, Arizona 85381, View MapA-Gas in the Americas is a subsidiary of A-Gas US Holdings Inc.A full copy of our email privacy policy can be viewed on the A-Gas website</text_data><comment_date>2020-10-21T00:00:00</comment_date></row><row _id="row-pqi6-atqp.43k4" _uuid="00000000-0000-0000-A3EB-BC1158E6199B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqi6-atqp.43k4"><intent_id>617815</intent_id><project_id>728842</project_id><text_data>Form filed by: Scott Whaley</text_data><comment_date>2014-02-26T00:00:00</comment_date></row><row _id="row-5jyn~848c.3m2a" _uuid="00000000-0000-0000-3BA0-24E3632F2F2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5jyn~848c.3m2a"><intent_id>610255</intent_id><project_id>716705</project_id><text_data>Filed by Jason Ogle.</text_data><comment_date>2013-12-31T00:00:00</comment_date></row><row _id="row-jn9i-igyt.3xr9" _uuid="00000000-0000-0000-0DC7-F2B4D8CBC8F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jn9i-igyt.3xr9"><intent_id>1202451</intent_id><project_id>984355</project_id><text_data>#1 Install NonStructural Handrail#2 Apartment#3 2 and 3#4  a, No b, No c, Yes d, No e, No f, No g, No h, No I, No j, No k, ? #5 Yes#6 Yes#7 No#8 No</text_data><comment_date>2022-01-04T00:00:00</comment_date></row><row _id="row-gfuk.p7r2_4vrr" _uuid="00000000-0000-0000-AA26-5AB728714F41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfuk.p7r2_4vrr"><intent_id>1092985</intent_id><project_id>903522</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and 2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2020-10-02T00:00:00</comment_date></row><row _id="row-fpxp-sqvu.sqgi" _uuid="00000000-0000-0000-5A87-06647BD21962" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fpxp-sqvu.sqgi"><intent_id>1140309</intent_id><project_id>945430</project_id><text_data>What is the purpose of this project: inspect modifications to jet fuel lineDoes this project include the fabrication, deliver, or installation of a non-standard item(s) : noDoes this specific project entail the remodeling or new construction of a facility: noIf your firm is working upon a type of building system, what type of system is involved?: utility linesWhat specific tasks will your employees perform? : witnessing of inspection of pipeline modificationWhat, if any, tools will your employees use in the performance of those tasks?: noneIf your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?: noAre you going to be hiring any subcontractors for this project? : no</text_data><comment_date>2021-04-28T00:00:00</comment_date></row><row _id="row-8mfa_rp4w_wakh" _uuid="00000000-0000-0000-5424-A37F246D35F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8mfa_rp4w_wakh"><intent_id>472705</intent_id><project_id>672491</project_id><text_data>System is for fire, security and demand alarms</text_data><comment_date>2011-09-20T00:00:00</comment_date></row><row _id="row-s4fd-qzy3_jxau" _uuid="00000000-0000-0000-DD4B-0FE8F15D129F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4fd-qzy3_jxau"><intent_id>630113</intent_id><project_id>735148</project_id><text_data>OTHER TRUCKS WILL BE A 4,000 GAL WATER TRUCK, TO BE USED FOR DUST CONTROL &amp; COMPACTION</text_data><comment_date>2014-05-16T00:00:00</comment_date></row><row _id="row-t2fn_zi64.q8jm" _uuid="00000000-0000-0000-94BF-78DB9F28AAB0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t2fn_zi64.q8jm"><intent_id>579060</intent_id><project_id>714716</project_id><text_data>MMFS Job#7336592</text_data><comment_date>2013-07-03T00:00:00</comment_date></row><row _id="row-n2aj_u7he~jv7y" _uuid="00000000-0000-0000-3029-F9F4A9455581" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2aj_u7he~jv7y"><intent_id>655229</intent_id><project_id>733054</project_id><text_data>Clean up to include; sweeping dirt off ground, picking up garbage and placing in trash receptacle. Tools to include cordless wrenches, crescent wrenches, spud wrenches.</text_data><comment_date>2014-09-23T00:00:00</comment_date></row><row _id="row-d4yw_7zni.c7ne" _uuid="00000000-0000-0000-452B-126DAEC0D6C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4yw_7zni.c7ne"><intent_id>763253</intent_id><project_id>791149</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2016-05-19T00:00:00</comment_date></row><row _id="row-td7z~5b3i.sgca" _uuid="00000000-0000-0000-9D92-B01B33114ADC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-td7z~5b3i.sgca"><intent_id>1006189</intent_id><project_id>892861</project_id><text_data>WO # 9533955</text_data><comment_date>2019-09-11T00:00:00</comment_date></row><row _id="row-ayys_2dxe~353y" _uuid="00000000-0000-0000-5BBA-C25E3BC691D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ayys_2dxe~353y"><intent_id>577746</intent_id><project_id>712319</project_id><text_data>Filed by: Rosie Grathwohl</text_data><comment_date>2013-06-26T00:00:00</comment_date></row><row _id="row-jmmz~2p57_zbkq" _uuid="00000000-0000-0000-8ABC-D509BD6AA2D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jmmz~2p57_zbkq"><intent_id>755077</intent_id><project_id>788907</project_id><text_data>1)We were contracted to replace a gas furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2016-04-06T00:00:00</comment_date></row><row _id="row-xrkn~nkyn_c38i" _uuid="00000000-0000-0000-7E4B-0DC97D791945" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xrkn~nkyn_c38i"><intent_id>1179300</intent_id><project_id>980235</project_id><text_data>Q2 is now paid. Please approve.</text_data><comment_date>2021-10-28T00:00:00</comment_date></row><row _id="row-nru6~yj3x-3ydp" _uuid="00000000-0000-0000-0F33-0F76BA864A66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nru6~yj3x-3ydp"><intent_id>487405</intent_id><project_id>675851</project_id><text_data>Job 1897</text_data><comment_date>2011-11-03T00:00:00</comment_date></row><row _id="row-tjqw.gsa8.df3j" _uuid="00000000-0000-0000-EB9F-440815BF8709" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tjqw.gsa8.df3j"><intent_id>638837</intent_id><project_id>733335</project_id><text_data>Installation and termination of copper UTP cabling for computer network inside elementary school portable classroom building. Conforms to WAC 296-127-01378 for work inside a building and terminating in MDF and IDF locations. Further complies with RCW19.28.400(13)(a) Telecommunications systems encompass all forms of information generation, processing, and transporting of signals conveyed electronically or optically within or between buildings, including voice, data, video, and audio.  Work is not specifically called out as Electronic Technician scope.</text_data><comment_date>2014-07-07T00:00:00</comment_date></row><row _id="row-imud-pyjy.wzqt" _uuid="00000000-0000-0000-E086-4D1DB6C79C23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imud-pyjy.wzqt"><intent_id>814397</intent_id><project_id>794034</project_id><text_data>Filed by Melinda Hart.This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2017-02-03T00:00:00</comment_date></row><row _id="row-628z-aytf~8e2j" _uuid="00000000-0000-0000-B534-6BF6DDF438C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-628z-aytf~8e2j"><intent_id>1236130</intent_id><project_id>1014792</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-06-13T00:00:00</comment_date></row><row _id="row-akj2~24ug.4355" _uuid="00000000-0000-0000-0CB1-2248D9A79EF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-akj2~24ug.4355"><intent_id>922481</intent_id><project_id>852046</project_id><text_data>Telecommunications work - indoor (only) Cat6 cabling of portables. IDF located in portable with station outlets. All other work will be Electric Technicians.</text_data><comment_date>2018-08-01T00:00:00</comment_date></row><row _id="row-gm9x.xz54~awxi" _uuid="00000000-0000-0000-FEDE-486ED48D0A4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gm9x.xz54~awxi"><intent_id>1136648</intent_id><project_id>958636</project_id><text_data>7:51Called out for a floor drain backing up in the maintenance shop. Upon arrival maintenance showed several toilets, floor drains and trough drains that were backing up. Cut out the clean-out cap in the storage room and camera inspected the line, there was a blockage at 66 feet. Ran mainline cable with 3 inch double blades until the line drained out. Pulled cable back while running water and brought nothing back on blades. Ran camera out again and could only get out approximately 70 feet. The line is draining and taking all water. Flushed toilets multiple times and ran water in the sinks while, watching all water flow by the camera. The line is cast iron. Suggested possibly Milling the line to smooth out rough cast iron. No guarantee due to the condition of the cast.</text_data><comment_date>2021-04-16T00:00:00</comment_date></row><row _id="row-pdet.jwpq.dce3" _uuid="00000000-0000-0000-A1BC-544C5868FEC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pdet.jwpq.dce3"><intent_id>675036</intent_id><project_id>753812</project_id><text_data>Work performed by the Telecommunication Technicians is installing Cat6 cabling for data indoors.  The purpose of the data cabling being installed is for computer networking.</text_data><comment_date>2015-01-16T00:00:00</comment_date></row><row _id="row-ged4.mvek-r8bu" _uuid="00000000-0000-0000-EE28-977B49150599" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ged4.mvek-r8bu"><intent_id>931142</intent_id><project_id>839965</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.Golden Pines 2901 NE 10th Renton WA Cedar River Terrace 51 Burnett Street Renton WA Cedar park Apartments 408 Monroe Ave NE Renton WA</text_data><comment_date>2018-09-06T00:00:00</comment_date></row><row _id="row-brus~cumf.z8yj" _uuid="00000000-0000-0000-0AFB-13C2C2A2145D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brus~cumf.z8yj"><intent_id>611150</intent_id><project_id>725036</project_id><text_data>Health &amp; Welfare - $7.24, Pension Fund - $10.27, Retirement Plan - $3.45, NEBF/Union - $2.11</text_data><comment_date>2014-01-08T00:00:00</comment_date></row><row _id="row-qjaz~bqm8-3rx6" _uuid="00000000-0000-0000-35EA-0435C6A62574" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qjaz~bqm8-3rx6"><intent_id>585417</intent_id><project_id>713270</project_id><text_data>Filed By: illegible</text_data><comment_date>2013-08-05T00:00:00</comment_date></row><row _id="row-5bju_j3vt.j3fi" _uuid="00000000-0000-0000-F55B-CA6AFEBF8F53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bju_j3vt.j3fi"><intent_id>559224</intent_id><project_id>706428</project_id><text_data>TGLC is hiring a sub (Davey Tree) to do all work; dormant oil spray.</text_data><comment_date>2013-03-08T00:00:00</comment_date></row><row _id="row-qcfh.wrgc.zkw3" _uuid="00000000-0000-0000-9253-BD31BACE865C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qcfh.wrgc.zkw3"><intent_id>1249265</intent_id><project_id>1022012</project_id><text_data>9896666</text_data><comment_date>2022-07-14T00:00:00</comment_date></row><row _id="row-ft96.hv34~ysq7" _uuid="00000000-0000-0000-2C69-8BCF72B433AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ft96.hv34~ysq7"><intent_id>828612</intent_id><project_id>818956</project_id><text_data>We carry our own insurance as a tribal entity.  You should have the information on file.</text_data><comment_date>2017-05-02T00:00:00</comment_date></row><row _id="row-n43t-7x8q.4fx6" _uuid="00000000-0000-0000-8F50-5F251E7E7912" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n43t-7x8q.4fx6"><intent_id>733582</intent_id><project_id>777801</project_id><text_data>Install 8 CAT6 cables to be used for telephone (voice over distance) or data (bits &amp; bytes) connection near work station L033.  All work to be performed indoors</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-efbj~ztdi~8y6n" _uuid="00000000-0000-0000-00F8-FA6C98136CC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efbj~ztdi~8y6n"><intent_id>1125088</intent_id><project_id>952212</project_id><text_data>9862428</text_data><comment_date>2021-02-25T00:00:00</comment_date></row><row _id="row-ngt8_z7bb_vduf" _uuid="00000000-0000-0000-DDCB-CE92330B8DFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ngt8_z7bb_vduf"><intent_id>696089</intent_id><project_id>762964</project_id><text_data>CORRECT CONTRACT NUMBER is 14-92015</text_data><comment_date>2015-06-18T00:00:00</comment_date></row><row _id="row-9efw-37sw.iwpf" _uuid="00000000-0000-0000-5BEC-C2914B7234B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9efw-37sw.iwpf"><intent_id>486670</intent_id><project_id>666070</project_id><text_data>Miles Job # 11055Truck Services Owner/Operator</text_data><comment_date>2011-10-31T00:00:00</comment_date></row><row _id="row-m97z~m5j7~keef" _uuid="00000000-0000-0000-5EBF-95B5741D0191" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m97z~m5j7~keef"><intent_id>699162</intent_id><project_id>764068</project_id><text_data>#1 - We will be wiring up a mini-split system heat pump.#2 - The structure is a single family dwelling.#3 - Including any basement or garage, the dwelling has 1 story.#4 - No commercial use in the structure. No retail use in the structure. It is a permanent residence only. It is not a rehabilitation house. t is not transitional housing. It is not a communal dining facility. It is not a treatment services center. It is not a dormitory. It is not a counseling center. The rooms and/or beds in the structure are not rented separately. There are no other uses for the structure.#5 - The dwelling unit does have its own self-contained kitchen.#6 - The dwelling unit does have its own bathroom. #7 - There is no a community facility or manager�s office on site.#8 - No part of the structure is used by the public.</text_data><comment_date>2015-06-08T00:00:00</comment_date></row><row _id="row-96nh-zbmj_9ngv" _uuid="00000000-0000-0000-BB94-A8D67CAC2339" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96nh-zbmj_9ngv"><intent_id>781893</intent_id><project_id>798387</project_id><text_data>Install CAT 6 Cables for WAP&amp;#39;s</text_data><comment_date>2016-08-12T00:00:00</comment_date></row><row _id="row-f995.37yq_w6az" _uuid="00000000-0000-0000-B65C-BF1B845447F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f995.37yq_w6az"><intent_id>1082707</intent_id><project_id>921369</project_id><text_data>In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions and resubmit your form:#1 - Describe the work that your firm was contracted to perform.  Chimney Repair#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?         Recreational Center#3 - Including any basement or garage, how many stories or levels does the structure have?   2 Floors#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure?  No(b) Any retail use in the structure?  No(c) Permanent residence only?  No(d) Rehabilitation house?  No(e) Transitional housing?  No(f) Communal dining facility?  No(g) Treatment services?  No(h) Assisted living services?  No(i) Dormitories?  No(j) Counseling?  No(k) Is each room and/or bed in the structure rented separately?  No(l) Other services or uses?  Community Recreational Center#5 - Does each dwelling unit have its own self-contained kitchen?  N/A#6 - Does each dwelling unit have its own bathroom?  N/A#7 - Is there a community facility or manager�s office on site?  Larry LaFave (City of Edmonds- Facility Maintenance) #425-563-3713 - Larry.LaFave@edmondswa.gov#8 - Is any part of the structure used by members of the public?  Yes, it is a community recreational center</text_data><comment_date>2020-08-27T00:00:00</comment_date></row><row _id="row-4wbj_vzqc~hunp" _uuid="00000000-0000-0000-9DDD-ABB2C9C95FCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4wbj_vzqc~hunp"><intent_id>1240958</intent_id><project_id>995809</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2022-06-14T00:00:00</comment_date></row><row _id="row-f2mc.ar89.5kr7" _uuid="00000000-0000-0000-1E36-116D69924C3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f2mc.ar89.5kr7"><intent_id>898549</intent_id><project_id>848300</project_id><text_data>install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2018-04-13T00:00:00</comment_date></row><row _id="row-as2p~h7i5_4qvw" _uuid="00000000-0000-0000-38C7-6960340BBC47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-as2p~h7i5_4qvw"><intent_id>658531</intent_id><project_id>745874</project_id><text_data>Work performed: Clean catch basins of sludge with hydro-excavator</text_data><comment_date>2014-10-23T00:00:00</comment_date></row><row _id="row-qfye~jvy2-evbb" _uuid="00000000-0000-0000-0500-B3320974AA33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qfye~jvy2-evbb"><intent_id>1156253</intent_id><project_id>961297</project_id><text_data>other trucks are lowboys to haul equipment spoke with liz at L&amp;I - we are self insured company and are in good standings</text_data><comment_date>2021-06-29T00:00:00</comment_date></row><row _id="row-5ve2.6x5y_awpg" _uuid="00000000-0000-0000-DBA6-658F6E98F280" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ve2.6x5y_awpg"><intent_id>1060228</intent_id><project_id>920040</project_id><text_data>Haz Waste worker to pressure wash screens using a small pressure washerMotor Pat Grader to vacuum area of all contaminated liquids</text_data><comment_date>2020-05-26T00:00:00</comment_date></row><row _id="row-gquc_wqgv-ni39" _uuid="00000000-0000-0000-5D36-CDE826B67E41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gquc_wqgv-ni39"><intent_id>685204</intent_id><project_id>755127</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2015-03-31T00:00:00</comment_date></row><row _id="row-tpzb~7ut2.7tqz" _uuid="00000000-0000-0000-3ABD-CF42F9108628" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tpzb~7ut2.7tqz"><intent_id>725689</intent_id><project_id>774397</project_id><text_data>installation dirt for building restoration</text_data><comment_date>2015-10-12T00:00:00</comment_date></row><row _id="row-e4gj_pih3_vb6j" _uuid="00000000-0000-0000-3681-D425D8A37F05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e4gj_pih3_vb6j"><intent_id>705097</intent_id><project_id>764104</project_id><text_data>Fringe = Medical $4.87 / 401K $7.34</text_data><comment_date>2015-07-02T00:00:00</comment_date></row><row _id="row-an7x.7455-eqda" _uuid="00000000-0000-0000-E9C5-4E4190C40118" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-an7x.7455-eqda"><intent_id>651134</intent_id><project_id>742797</project_id><text_data>Form filed by: Gary Falter</text_data><comment_date>2014-08-28T00:00:00</comment_date></row><row _id="row-hyp8~k54a_fkek" _uuid="00000000-0000-0000-C7D1-4FF76688169A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hyp8~k54a_fkek"><intent_id>698533</intent_id><project_id>702996</project_id><text_data>Service Call to cut fire sprinkler drops back for new ceilings (18).</text_data><comment_date>2015-06-04T00:00:00</comment_date></row><row _id="row-3x9q~3yyg.8zkm" _uuid="00000000-0000-0000-88A7-74FC39DB1968" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3x9q~3yyg.8zkm"><intent_id>919556</intent_id><project_id>854756</project_id><text_data>Installation permanent fence</text_data><comment_date>2018-07-19T00:00:00</comment_date></row><row _id="row-n87p_yyq9_kkd4" _uuid="00000000-0000-0000-418B-C55472EF1DC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n87p_yyq9_kkd4"><intent_id>1255147</intent_id><project_id>1017411</project_id><text_data>Oregon workman's comp covers employees working in Washington</text_data><comment_date>2022-08-04T00:00:00</comment_date></row><row _id="row-3vk7.v9qe_dr3v" _uuid="00000000-0000-0000-415C-AA0F129E004A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vk7.v9qe_dr3v"><intent_id>944925</intent_id><project_id>864942</project_id><text_data>LNI.WA.GOV says rate is 30.59 per hour for glaziers on 11-8-2018</text_data><comment_date>2018-11-08T00:00:00</comment_date></row><row _id="row-tmdj.bk2t~aefs" _uuid="00000000-0000-0000-48B1-C27F3808A06B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tmdj.bk2t~aefs"><intent_id>1144453</intent_id><project_id>962262</project_id><text_data>General laborer consists of hand work only (no power tools or equipment) $33.86 base + $8.46 pensionMotor Patrol Graders are used to help with compaction before paving operations $56.39 base + $14.10 pensionOther trucks consists of a 0 to 8,000 gallon water truck used to help with compaction and dust control $41.11 base + $10.28 pension</text_data><comment_date>2021-05-13T00:00:00</comment_date></row><row _id="row-54z5~de4w-btt2" _uuid="00000000-0000-0000-845F-683F6DCC8335" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-54z5~de4w-btt2"><intent_id>1175294</intent_id><project_id>978152</project_id><text_data>#1 Replace bath fan/light. #2 Single family dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2021-09-07T00:00:00</comment_date></row><row _id="row-bqhz~r83q-tkgc" _uuid="00000000-0000-0000-7E07-A38774A45515" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bqhz~r83q-tkgc"><intent_id>572386</intent_id><project_id>712140</project_id><text_data>This King County Single Family home is a total of two units. The home has a kitchen and at least one bathroom and is considered a permanent residence for all its tenants. This building is no more than two stories in height. The electricians will be replacing lights and fans. This job meets the residential job requirements.</text_data><comment_date>2013-05-30T00:00:00</comment_date></row><row _id="row-s5zg~8mk2-f2ds" _uuid="00000000-0000-0000-6C6B-D93E784085B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s5zg~8mk2-f2ds"><intent_id>661009</intent_id><project_id>746877</project_id><text_data>A. THIS IS A DESIGN PROJECT TO DEVELOP THE DESIGN AND DRAWINGS FOR A FUTURE BUILDING PROJECT. B. PACIFIC MOBILE STRUCTURES ROLE IN THIS DESIGN PROJECT IS TO CREATE THE DRAWINGS AND ENGINEERING FOR THE MODULAR BUILDING PROJECT.C. IT IS VERY POSSIBLE THAT WE WILL NOT HAVE ANY ON SITE LABOR BUT JUST IN CASE A CARPENTER HAS TO ACCOMPANY SUPERVISORY/DESIGN ENGINEER, I HAVE INCLUDED THIS AS POTENTIAL ONLY.</text_data><comment_date>2014-10-21T00:00:00</comment_date></row><row _id="row-wbb6_j29g.i5uh" _uuid="00000000-0000-0000-1E42-E49DD430AA22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wbb6_j29g.i5uh"><intent_id>878156</intent_id><project_id>828767</project_id><text_data>#1 - Building envelope upgrades. New siding and windows#2 - Apartment building#3 - 3#4 - (a)no (b)no (c)yes (d)no (e)no (f)no (g)no (h)no (i)no (j)no (k)yes#5 - yes#6 - yes#7 - yes#8 - yes</text_data><comment_date>2017-12-07T00:00:00</comment_date></row><row _id="row-9ih8~pvb5~2zvh" _uuid="00000000-0000-0000-866F-234AD0C2E9D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ih8~pvb5~2zvh"><intent_id>485036</intent_id><project_id>676733</project_id><text_data>Local contact phone number for Ershigs Sheet Metal is Janell Brozovich @ 360/527-3439We will have 1 Journeyman Sheet Metal Work on project for approx. 38 hours. Basic Journeyman Rate is $35.13 per hourEmployer Contributions total $20.02 per hourTotal Package is $55.15 per hour</text_data><comment_date>2011-10-21T00:00:00</comment_date></row><row _id="row-7iam_7pdt.6m3k" _uuid="00000000-0000-0000-5B1D-CE21F289B8F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7iam_7pdt.6m3k"><intent_id>816095</intent_id><project_id>813541</project_id><text_data>057012</text_data><comment_date>2017-02-15T00:00:00</comment_date></row><row _id="row-sjcx-2vaj~acx5" _uuid="00000000-0000-0000-DB4D-F1467ED8DE8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sjcx-2vaj~acx5"><intent_id>784358</intent_id><project_id>745512</project_id><text_data>Job # 170185</text_data><comment_date>2016-08-23T00:00:00</comment_date></row><row _id="row-rbpu_2buh_ajpd" _uuid="00000000-0000-0000-F684-79F5B6CCFF0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rbpu_2buh_ajpd"><intent_id>946040</intent_id><project_id>833774</project_id><text_data>Neither the WA State Wage pages or the Federal Prevailing Wage Rates page from 4/14/2017 contain a breakdown of the $24.71 fringe. How am i supposed to know what it is?</text_data><comment_date>2019-05-14T00:00:00</comment_date></row><row _id="row-5cex.vzah-ji8f" _uuid="00000000-0000-0000-4C6C-828C8A6EBBB4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5cex.vzah-ji8f"><intent_id>527187</intent_id><project_id>679461</project_id><text_data>1.  REMOVAL AND DISPOSAL OF INSULATION IN CRAWLSPACE    INSTALL INSULATION INTO UNDERFLOOR AND VAPOR BARRIER2.  YES3.  ONE4.  A) NO    B) NO    C) YES    D) NO    E) NO    F) NO    G) NO    H) NO    I) NO    J) NO    K) NO5.  YES6.  YES7.  NO8.  NO</text_data><comment_date>2012-08-30T00:00:00</comment_date></row><row _id="row-465s.8iu3.4jdn" _uuid="00000000-0000-0000-5BC8-08538FC8B642" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-465s.8iu3.4jdn"><intent_id>446952</intent_id><project_id>619227</project_id><text_data>Vactor truck, guzzler, super sucker</text_data><comment_date>2011-06-14T00:00:00</comment_date></row><row _id="row-xkx8_u6jf-8a9k" _uuid="00000000-0000-0000-CF8C-7E12BA3639FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xkx8_u6jf-8a9k"><intent_id>863409</intent_id><project_id>771996</project_id><text_data>Rough-in coaxial cable for the audio/visual system throughout the Performing Arts Center. Leave the coaxial cable coiled in the IDF rooms for a different contractor to complete the terminations. Install ladder-rack in the IDF. All work is to be completed indoors.</text_data><comment_date>2017-09-18T00:00:00</comment_date></row><row _id="row-dns8-hnc9~4ma4" _uuid="00000000-0000-0000-81A4-6EC14D3428C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dns8-hnc9~4ma4"><intent_id>1125509</intent_id><project_id>952451</project_id><comment_date>2021-03-01T00:00:00</comment_date></row><row _id="row-6r58~p444-qmqj" _uuid="00000000-0000-0000-1362-5A81CB635C65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6r58~p444-qmqj"><intent_id>1128045</intent_id><project_id>953892</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2021-03-19T00:00:00</comment_date></row><row _id="row-qebk_pzf4~4jpb" _uuid="00000000-0000-0000-7108-B1061A537ED9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qebk_pzf4~4jpb"><intent_id>605545</intent_id><project_id>689324</project_id><text_data>Form Filed By: Greg Means</text_data><comment_date>2013-11-20T00:00:00</comment_date></row><row _id="row-tnjf~p9yt.iruq" _uuid="00000000-0000-0000-078D-80F463C7CD84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tnjf~p9yt.iruq"><intent_id>1293512</intent_id><project_id>1018986</project_id><text_data>Please note that if claimed Vacation Pay is employee-paid through a deduction from gross wages, it may not be claimed as a fringe benefit credit. Workers must be reimbursed for any wage underpayments due to this ineligible fringe benefit credit. Approval of Intent or Affidavit is based upon information provided by the contractor and does not signify approval of trade classifications or fringe benefits claimed.</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-vfrc~grnc~b5vx" _uuid="00000000-0000-0000-3188-5DE61325A95B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfrc~grnc~b5vx"><intent_id>880269</intent_id><project_id>839506</project_id><text_data>Industrial Insurance ID 965392-03</text_data><comment_date>2019-04-09T00:00:00</comment_date></row><row _id="row-ej9k_qqxu.dmev" _uuid="00000000-0000-0000-1B0D-DCE94A9DA7E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ej9k_qqxu.dmev"><intent_id>507595</intent_id><project_id>685883</project_id><text_data>697967</text_data><comment_date>2012-04-12T00:00:00</comment_date></row><row _id="row-5bng~xp89_akuh" _uuid="00000000-0000-0000-02D7-AC69171460A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bng~xp89_akuh"><intent_id>583076</intent_id><project_id>706150</project_id><text_data>4 axle truck and 3 axle flatbed</text_data><comment_date>2013-07-26T00:00:00</comment_date></row><row _id="row-sd4d-6y52.v5ez" _uuid="00000000-0000-0000-CDCB-C600B9277E38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sd4d-6y52.v5ez"><intent_id>544837</intent_id><project_id>691896</project_id><text_data>2512032</text_data><comment_date>2012-11-15T00:00:00</comment_date></row><row _id="row-vyxt_3jw7_6jmg" _uuid="00000000-0000-0000-6513-FEF7EF6FC859" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vyxt_3jw7_6jmg"><intent_id>1057372</intent_id><project_id>918690</project_id><text_data>Blythe work order 92485^</text_data><comment_date>2020-05-12T00:00:00</comment_date></row><row _id="row-6pwr~6xzx_tmct" _uuid="00000000-0000-0000-9E5F-D89CFE9E6AAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6pwr~6xzx_tmct"><intent_id>575069</intent_id><project_id>712409</project_id><text_data>Irrigation, landscape grading, sod and seed</text_data><comment_date>2013-06-13T00:00:00</comment_date></row><row _id="row-hdk6.afcu.mivb" _uuid="00000000-0000-0000-84F0-C63D01623626" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hdk6.afcu.mivb"><intent_id>1316911</intent_id><project_id>1061706</project_id><text_data>Telecommunications Technician will perform same work in Pullman, Tekoa and Albion Washington, all located in Whitman County.</text_data><comment_date>2023-04-07T00:00:00</comment_date></row><row _id="row-b4r5_hrbz~jiz6" _uuid="00000000-0000-0000-1F75-7649B8425CD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b4r5_hrbz~jiz6"><intent_id>1047760</intent_id><project_id>906873</project_id><text_data>1 drain clearing 2 single 3 na 4a no b no c yes d no e no f no g no h no i no j no k no 5 yes 6 yes 7 no 8 no</text_data><comment_date>2020-03-25T00:00:00</comment_date></row><row _id="row-4q32~q657_b7ac" _uuid="00000000-0000-0000-8B7E-AE6E06FF28E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4q32~q657_b7ac"><intent_id>1020177</intent_id><project_id>898813</project_id><text_data>MMFS Contract #37186, 8/1/2019 thru 7/31/2020</text_data><comment_date>2019-11-06T00:00:00</comment_date></row><row _id="row-2qik_cqcn~22wv" _uuid="00000000-0000-0000-0B89-2EE03DFDD141" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2qik_cqcn~22wv"><intent_id>509364</intent_id><project_id>681307</project_id><text_data>Filed by: H. C. Todhunter</text_data><comment_date>2012-04-26T00:00:00</comment_date></row><row _id="row-w97x~cuam~wx2z" _uuid="00000000-0000-0000-3330-100B932DB06E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w97x~cuam~wx2z"><intent_id>699554</intent_id><project_id>759496</project_id><text_data>Installation of 320 sq ft of sod to repair the lawn</text_data><comment_date>2015-06-10T00:00:00</comment_date></row><row _id="row-gpia_tszt_725v" _uuid="00000000-0000-0000-8640-83A24FB62D4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gpia_tszt_725v"><intent_id>1317288</intent_id><project_id>1061945</project_id><text_data>We are a Tribal Owned Company whose private insurance meets and/or exceeds LNI's Workers Comp.</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-9asj-5pfv.mmi4" _uuid="00000000-0000-0000-72F1-E8F44ED00EC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9asj-5pfv.mmi4"><intent_id>975502</intent_id><project_id>850982</project_id><text_data>Complete install for irrigation system, topsoil and plants</text_data><comment_date>2019-05-02T00:00:00</comment_date></row><row _id="row-edgh.nrf3-7d5k" _uuid="00000000-0000-0000-8448-1A5B93021974" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-edgh.nrf3-7d5k"><intent_id>935426</intent_id><project_id>862398</project_id><text_data>Note: Workers who perform work on the electrical side of generators (for example, this includes - but is not limited to - load, battery, and transfer tests) must be compensated at the Inside Wireman Electrician/Journey Level (WAC 296-127-01323) prevailing rate of wage for this work. You must specify the nature of the work performed on this generator when filing the Affidavit and keep time records of start/stop times within each classification that are available upon request.</text_data><comment_date>2018-11-16T00:00:00</comment_date></row><row _id="row-898i_dj4k-b5zm" _uuid="00000000-0000-0000-18EB-103A1234A478" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-898i_dj4k-b5zm"><intent_id>629179</intent_id><project_id>734775</project_id><text_data>During construction, we will be removing shrubs, installing topsoil and bark, and laying sod.</text_data><comment_date>2014-05-14T00:00:00</comment_date></row><row _id="row-r8c3~zxew_pvfp" _uuid="00000000-0000-0000-22FF-DE8D52D9F7AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r8c3~zxew_pvfp"><intent_id>669212</intent_id><project_id>750466</project_id><text_data>Pipe fitting, threading with pipe machine, grinding and assist with installing boiler. Use of pipe wrenches, no vehicle use.</text_data><comment_date>2014-12-10T00:00:00</comment_date></row><row _id="row-eqjf~ia94.kfy3" _uuid="00000000-0000-0000-6F09-F9E558A810AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eqjf~ia94.kfy3"><intent_id>639050</intent_id><project_id>735422</project_id><text_data>We will be intalling visual display boards which will be permanent</text_data><comment_date>2014-07-03T00:00:00</comment_date></row><row _id="row-sqtv~gwpv-vpiz" _uuid="00000000-0000-0000-B8D0-3DBB68FE6BCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqtv~gwpv-vpiz"><intent_id>914574</intent_id><project_id>854613</project_id><text_data>I am aware of the industrial statistician�s desire to change ecological restoration�s customary trade of Landscape Construction with Planting Labor occupation rates of $17.87, to Laborer Trade with occupation rates that triple wages for brushcutting and erosion protection. Changing the rates to $47+/hr will shock and constrain efforts to contain invasive species � an effort critical to the long-term health of our state.I would ask that you determine one average rate collected from restoration professionals in King County, a relatively small pool of contractors trusted to do this work: Applied Ecology (justin@applied-ecology.com);  Forestry Consultant Contg (bluedolphin6@earthlink.net);  Signature Restoration Division (ezra.hedblom@signaturels.com); EarthCorps (steve@earthcorps.org); Please also contact King County Noxious Weed Division to get an idea what a tripling of prevailing wages would do to noxious weed control efforts (Sasha.Shaw@kingcounty.gov).</text_data><comment_date>2018-06-28T00:00:00</comment_date></row><row _id="row-yt9s_svb3-9v95" _uuid="00000000-0000-0000-7A7C-5618C492439A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yt9s_svb3-9v95"><intent_id>862460</intent_id><project_id>811991</project_id><text_data>Notified to file Intent &amp; Affidavit on 9/13/2017.</text_data><comment_date>2017-09-13T00:00:00</comment_date></row><row _id="row-5gnn~2i6a.xu2c" _uuid="00000000-0000-0000-E438-8CCD9B3DBB1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5gnn~2i6a.xu2c"><intent_id>819871</intent_id><project_id>815238</project_id><text_data>&amp;quot;OTHER&amp;quot; TRUCK WILL BE 4000 GALLON WATER TRUCK, TO BE USED FOR DUST CONTROL &amp; COMPACTION</text_data><comment_date>2017-03-09T00:00:00</comment_date></row><row _id="row-hvaa.xzvv-gzzn" _uuid="00000000-0000-0000-53D0-D15F68864FE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hvaa.xzvv-gzzn"><intent_id>765646</intent_id><project_id>793428</project_id><text_data>Job # 8013579</text_data><comment_date>2016-06-01T00:00:00</comment_date></row><row _id="row-62yp_bauu~zb86" _uuid="00000000-0000-0000-CE6C-0441576B0CC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-62yp_bauu~zb86"><intent_id>687791</intent_id><project_id>759417</project_id><text_data>TEAR UP GLUED JUTE BACK CARPETINSTALL CARPET TILE AND RUBBER BASEINSTALL CARPET ON STAIRS</text_data><comment_date>2015-04-07T00:00:00</comment_date></row><row _id="row-mun4~v2ys~i2v8" _uuid="00000000-0000-0000-D2CF-B967542CD160" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mun4~v2ys~i2v8"><intent_id>1199426</intent_id><project_id>991186</project_id><text_data>JMT Job #281043879  WA State Patrol Lenel Door Addition</text_data><comment_date>2021-12-15T00:00:00</comment_date></row><row _id="row-epsd.3632-q23p" _uuid="00000000-0000-0000-6421-232146526189" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-epsd.3632-q23p"><intent_id>1293518</intent_id><project_id>979033</project_id><text_data>PENSION 8.20, HEATH AND WELFARE 9.47, VACATION 3.98, HOLIDAY 1.43</text_data><comment_date>2023-01-04T00:00:00</comment_date></row><row _id="row-pivk_p2qf-cp5g" _uuid="00000000-0000-0000-95D6-AC6BB8E35C57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pivk_p2qf-cp5g"><intent_id>1316200</intent_id><project_id>980319</project_id><text_data>Edward Cowden owner operator 3-14-23 worked 5.5 hours</text_data><comment_date>2023-03-31T00:00:00</comment_date></row><row _id="row-4vru~6vqf.vyjr" _uuid="00000000-0000-0000-395D-7A6CBE8B34D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4vru~6vqf.vyjr"><intent_id>1310894</intent_id><project_id>1057976</project_id><text_data>Project# 04238, 11015 E Nixon Ave, Spokane Valley, WA 99206</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-nq3n-98gd~rciq" _uuid="00000000-0000-0000-40B6-D78846868E41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nq3n-98gd~rciq"><intent_id>1310894</intent_id><project_id>1057976</project_id><text_data>Project# 04213, Miller, Delila, 6300 E 2nd Ave, Lot 107, Spokane, WA 99212</text_data><comment_date>2023-03-20T00:00:00</comment_date></row><row _id="row-knx4.ye9b.bwzq" _uuid="00000000-0000-0000-CA79-35600D869A7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knx4.ye9b.bwzq"><intent_id>1317208</intent_id><project_id>1055875</project_id><text_data>all electrical work to be performed in singled family single story dwelling that will only be used as permanent residence that the public does not have access to</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-5pie.r4mu.nead" _uuid="00000000-0000-0000-DE61-EF65F5FA41E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5pie.r4mu.nead"><intent_id>560069</intent_id><project_id>706794</project_id><text_data>Sent email:  On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2013-05-02T00:00:00</comment_date></row><row _id="row-t4dx.uqew~3v5p" _uuid="00000000-0000-0000-549D-E02174B84191" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t4dx.uqew~3v5p"><intent_id>681323</intent_id><project_id>735286</project_id><text_data>Form filed by:  Susan Hill</text_data><comment_date>2015-02-27T00:00:00</comment_date></row><row _id="row-bphc~r3sx_s3ng" _uuid="00000000-0000-0000-4809-7E7E2871D933" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bphc~r3sx_s3ng"><intent_id>722708</intent_id><project_id>773226</project_id><text_data>Laborers - General :  workers performing manual labor with manual tools (shovels, rakes)</text_data><comment_date>2015-09-24T00:00:00</comment_date></row><row _id="row-pm7z~mt6t_2q9j" _uuid="00000000-0000-0000-00B2-15177D7FCF8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pm7z~mt6t_2q9j"><intent_id>990865</intent_id><project_id>886836</project_id><text_data>Single family residence weatherization &amp; insulation upgrade</text_data><comment_date>2019-07-10T00:00:00</comment_date></row><row _id="row-9n69~itzq-sijv" _uuid="00000000-0000-0000-3411-46FC3113FA69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9n69~itzq-sijv"><intent_id>511880</intent_id><project_id>687640</project_id><text_data>291465</text_data><comment_date>2012-05-15T00:00:00</comment_date></row><row _id="row-r67c-pjy3~yfhn" _uuid="00000000-0000-0000-F836-EBF9A4D4CA31" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r67c-pjy3~yfhn"><intent_id>818940</intent_id><project_id>762222</project_id><text_data>Signed by Robert M Tate</text_data><comment_date>2017-03-03T00:00:00</comment_date></row><row _id="row-tmnm-wuzm~jnfv" _uuid="00000000-0000-0000-4E96-FCF89E482426" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tmnm-wuzm~jnfv"><intent_id>1072475</intent_id><project_id>925548</project_id><text_data>installation of (4) 6-strand singlemode fibers between MDF and IDFs. All work will be performed inside.</text_data><comment_date>2020-07-15T00:00:00</comment_date></row><row _id="row-hfn3-5rxt.gnae" _uuid="00000000-0000-0000-7653-EF64F1B14912" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hfn3-5rxt.gnae"><intent_id>1160556</intent_id><project_id>966691</project_id><text_data>121010-001</text_data><comment_date>2021-07-15T00:00:00</comment_date></row><row _id="row-w4tv~c9ia-g4tr" _uuid="00000000-0000-0000-D7D1-C701EDA4B405" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w4tv~c9ia-g4tr"><intent_id>526400</intent_id><project_id>678119</project_id><text_data>Form filed by: Alice Kamp - petu235Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2012-08-03T00:00:00</comment_date></row><row _id="row-d4dg~iane-pdsr" _uuid="00000000-0000-0000-A2CF-1D846794CC0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4dg~iane-pdsr"><intent_id>536987</intent_id><project_id>696377</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-02T00:00:00</comment_date></row><row _id="row-8va3~m8r2-4g6i" _uuid="00000000-0000-0000-9A3E-0CB9D5F29CDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8va3~m8r2-4g6i"><intent_id>668590</intent_id><project_id>719277</project_id><text_data>General Laborer: Performs work of shoveling with a hand shovel, Cleaning-Sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket.Other Trucks: A Low Boy trailer for delivery and pick up of equipment.</text_data><comment_date>2014-12-05T00:00:00</comment_date></row><row _id="row-aee3_euyv.w3j3" _uuid="00000000-0000-0000-5929-A8A5B86A6A28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aee3_euyv.w3j3"><intent_id>589957</intent_id><project_id>718571</project_id><text_data>pruning and tree trimming /wire clearance</text_data><comment_date>2013-08-26T00:00:00</comment_date></row><row _id="row-wauc_inmg-mzuv" _uuid="00000000-0000-0000-1ABD-B4385ADB872A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wauc_inmg-mzuv"><intent_id>581077</intent_id><project_id>715459</project_id><text_data>GENERAL LABORERS USE HAND TOOLS SUCH AS SHOVELS AND RAKE AND DO MANUAL TASKS SUCH AS INSTALLING SILT FENCE AND HAY. OTHER TRUCKS INCLUDE LOWBOY AND/OR WATERTRUCKS.</text_data><comment_date>2013-07-15T00:00:00</comment_date></row><row _id="row-kdnd.5jtd.67uu" _uuid="00000000-0000-0000-5EF7-46B3CAC8429E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kdnd.5jtd.67uu"><intent_id>1318775</intent_id><project_id>1062826</project_id><text_data>SR53872388 invoice 89679617</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-e8de_bivp~ufw5" _uuid="00000000-0000-0000-E217-6A3EBF1F0909" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e8de_bivp~ufw5"><intent_id>1227464</intent_id><project_id>1009623</project_id><text_data>WRI JOB# 22.850/48011</text_data><comment_date>2022-04-21T00:00:00</comment_date></row><row _id="row-v5nu_wa3i-htre" _uuid="00000000-0000-0000-BD71-F8DE2BFC2D40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v5nu_wa3i-htre"><intent_id>837748</intent_id><project_id>823263</project_id><text_data>Install new cables that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-06-02T00:00:00</comment_date></row><row _id="row-9j67~38jb~b6fb" _uuid="00000000-0000-0000-7F01-813316D51E35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9j67~38jb~b6fb"><intent_id>549953</intent_id><project_id>699206</project_id><text_data>From: Christensen-Russell, Ramona (LNI) Sent: Thursday, February 28, 2013 11:43 AMTo: 'acasida@sigmasixinc.com'Subject: Intent Id: 549953 filed as Work Not Covered / SIGMA SIX SOLUTIONS INC / SNOHOMISH COUNTY / Dreamlifter Operations CenterIn an effort to obtain the information necessary to evaluate your form filing, we must have more information regarding the project.�	Was any disconnection of wires performed during this project by your workers?  Specifically, did your workers make/break wiring connections during testing, even temporarily, in order to perform the contracted work?  This would include any processes necessary for your workers to connect/disconnect testing instruments.  If your workers did no disconnections, but such work was performed by another contractor, please supply the business name.�	Was any power equipment operated to load/unload testing equipment such as a forklift?</text_data><comment_date>2013-02-28T00:00:00</comment_date></row><row _id="row-izqn~5awq_bs7c" _uuid="00000000-0000-0000-2E35-D9C7CB4B9F59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-izqn~5awq_bs7c"><intent_id>712771</intent_id><project_id>769340</project_id><text_data>1. Wheelchair Ramp 2. Single Family dwelling 3. 1.5  4.a-no b-no c-yes d-no e-no f-no g-no h-no i-no j-no  5. yes 6. yes 7. no 8. no</text_data><comment_date>2015-08-06T00:00:00</comment_date></row><row _id="row-jih8.n53t_56dh" _uuid="00000000-0000-0000-5BFB-BD5880AC8C1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jih8.n53t_56dh"><intent_id>584554</intent_id><project_id>716644</project_id><text_data>Form Filed By; R. T. Vatne</text_data><comment_date>2013-07-31T00:00:00</comment_date></row><row _id="row-cijx.n9d9_5js8" _uuid="00000000-0000-0000-AB7E-6C944E07DE17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cijx.n9d9_5js8"><intent_id>959355</intent_id><project_id>872793</project_id><text_data>01-JM02-BS</text_data><comment_date>2019-02-07T00:00:00</comment_date></row><row _id="row-8udz.9d2i~vky4" _uuid="00000000-0000-0000-2A39-22B794FC1FB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8udz.9d2i~vky4"><intent_id>523469</intent_id><project_id>689238</project_id><text_data>Filed by Alex (Last name unreadable)</text_data><comment_date>2012-07-19T00:00:00</comment_date></row><row _id="row-gbrv_53pd_2vc2" _uuid="00000000-0000-0000-475F-71B5B041C6F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbrv_53pd_2vc2"><intent_id>631243</intent_id><project_id>733595</project_id><text_data>Benefits:  Health and Insurance Trust Fund = $5.80, Pension Trust Fund = $4.35, Training Trust Fund = $0.35</text_data><comment_date>2014-05-23T00:00:00</comment_date></row><row _id="row-7rss_k9v4-7682" _uuid="00000000-0000-0000-EA14-26494504736A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7rss_k9v4-7682"><intent_id>509743</intent_id><project_id>684534</project_id><text_data>1205 s. 29th aveyakima,wa 98902</text_data><comment_date>2012-04-30T00:00:00</comment_date></row><row _id="row-86ug_ji6c-4zv4" _uuid="00000000-0000-0000-2068-C73A3CBDEBFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-86ug_ji6c-4zv4"><intent_id>863093</intent_id><project_id>832741</project_id><text_data>This job is an irrigation system upgrade. Work will include installing, servicing or repairing above ground lawn sprinkler system to a maximum depth of three feet below finish grade. All work falls within the Landscape Construction category.</text_data><comment_date>2017-09-15T00:00:00</comment_date></row><row _id="row-jsny~cqev~u64v" _uuid="00000000-0000-0000-AF6F-4ABBE2C22A7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jsny~cqev~u64v"><intent_id>829740</intent_id><project_id>819426</project_id><text_data>We are working on a data communications system by hanging wireless access points on the ceiling and then connecting Cat5e cable to the wireless access points. The goal of the project is an indoor wireless data communications network.  This is for internet access.</text_data><comment_date>2017-04-28T00:00:00</comment_date></row><row _id="row-79nu-r8h8~guzy" _uuid="00000000-0000-0000-BE74-371A72DCB426" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-79nu-r8h8~guzy"><intent_id>597751</intent_id><project_id>721419</project_id><text_data>indoor- install server rack circuits</text_data><comment_date>2013-10-04T00:00:00</comment_date></row><row _id="row-cr4c-wfyw-vtgf" _uuid="00000000-0000-0000-633E-8AF2D5DEF8FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cr4c-wfyw-vtgf"><intent_id>675199</intent_id><project_id>738170</project_id><text_data>Truck Type, Ford Box Van.  Size, 14,000 gross wt, 14&amp;#39;bed length .  purpose, deliver casework to site</text_data><comment_date>2015-01-23T00:00:00</comment_date></row><row _id="row-5bq6~5naf~hk9u" _uuid="00000000-0000-0000-0A0D-F60EE1F1205D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bq6~5naf~hk9u"><intent_id>993517</intent_id><project_id>887855</project_id><text_data>base needed for add on stairs</text_data><comment_date>2019-07-22T00:00:00</comment_date></row><row _id="row-piiw_zu9h~dxwq" _uuid="00000000-0000-0000-0061-6D406D148F9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-piiw_zu9h~dxwq"><intent_id>823770</intent_id><project_id>800494</project_id><text_data>$11.98 pension, $ 13.21 H&amp;W, $ 1.93 train/etc.</text_data><comment_date>2017-04-06T00:00:00</comment_date></row><row _id="row-cxfu.h6r7_n88h" _uuid="00000000-0000-0000-4F85-CFDED7D44C8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxfu.h6r7_n88h"><intent_id>1318826</intent_id><project_id>1062865</project_id><text_data>Inv # 571195</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-jhqz-z5aw_bv8m" _uuid="00000000-0000-0000-9E2B-1A02DC06B9C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jhqz-z5aw_bv8m"><intent_id>1318639</intent_id><project_id>977604</project_id><text_data>115143</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-4f4h-w8qf~i6wa" _uuid="00000000-0000-0000-5EDC-EB80B40689AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4f4h-w8qf~i6wa"><intent_id>1318713</intent_id><project_id>1062774</project_id><text_data>9910300</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-faws_uewe~9avv" _uuid="00000000-0000-0000-E92B-2DD7926D50F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-faws_uewe~9avv"><intent_id>642122</intent_id><project_id>739718</project_id><text_data>CRYSTALL JEFFREY13807 1ST AVE CT E #27TACOMA WA 98445</text_data><comment_date>2014-07-18T00:00:00</comment_date></row><row _id="row-83vr_3ifa.7ffy" _uuid="00000000-0000-0000-5922-9D5253BDAEF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-83vr_3ifa.7ffy"><intent_id>481834</intent_id><project_id>675685</project_id><text_data>We have examined our fringe rate and confirm it includes only benefits allowable under WAC 296-127-014.  The fringes include only the following:  an employer provided health plan, employer-paid life insurance, actual used vacation (not accrued), holidays, and contributions to the trust associated with an IRS-approved, trustee-managed ERISA pension plan.</text_data><comment_date>2011-10-04T00:00:00</comment_date></row><row _id="row-rvp8-kmzn_kz6b" _uuid="00000000-0000-0000-646F-39E125AFC127" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rvp8-kmzn_kz6b"><intent_id>1286318</intent_id><project_id>1033954</project_id><text_data>1.	INSTALL WINDOW OR GLASS2.	APARTMENTS3.	2	4 A. NOB.	NOC. YESD.NOE. NOF. NOG. NOH. NOI.NOJ.NOK.NOL.NO5-YES6-YES7-YES8-YES</text_data><comment_date>2022-11-29T00:00:00</comment_date></row><row _id="row-dad4_5q3i_qdgj" _uuid="00000000-0000-0000-D1DA-571D58483D24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dad4_5q3i_qdgj"><intent_id>733161</intent_id><project_id>777610</project_id><text_data>For emergency storm repair and response work, all apprentice and lineman wages are doubletime.</text_data><comment_date>2015-11-25T00:00:00</comment_date></row><row _id="row-t7i5~9ent-s27z" _uuid="00000000-0000-0000-F972-D6BEAF694783" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t7i5~9ent-s27z"><intent_id>792816</intent_id><project_id>803770</project_id><text_data>36498416 / 82951031 Replace upright heads in chair storage area with pendant heads and guards, install new dry barrel heads Located at exterior exits and north end storage bldgs.</text_data><comment_date>2016-09-29T00:00:00</comment_date></row><row _id="row-gp73.nddv~ygg7" _uuid="00000000-0000-0000-8875-1C906AC000E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gp73.nddv~ygg7"><intent_id>659216</intent_id><project_id>744675</project_id><text_data>094114</text_data><comment_date>2014-10-08T00:00:00</comment_date></row><row _id="row-9cfc.3it3~63bw" _uuid="00000000-0000-0000-DD22-284F15F4AF13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9cfc.3it3~63bw"><intent_id>1002758</intent_id><project_id>891456</project_id><text_data>Specific tasks: site prep for replanting: brush control, using weed trimmers and/or walk behind mowers, and application of herbicides directly to competing invasive plants, using a hand held wand attached to a small backpack tank, under the direct supervision of a licensed applicator.</text_data><comment_date>2019-08-27T00:00:00</comment_date></row><row _id="row-9cwp-jf4g_6hbw" _uuid="00000000-0000-0000-B252-8E218F4A67EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9cwp-jf4g_6hbw"><intent_id>576064</intent_id><project_id>713588</project_id><text_data>CEC job</text_data><comment_date>2013-06-18T00:00:00</comment_date></row><row _id="row-f89q.nwkm_fr87" _uuid="00000000-0000-0000-46CE-67C681930D96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f89q.nwkm_fr87"><intent_id>877358</intent_id><project_id>838591</project_id><text_data>Test 1600 amp breaker, remove old disconnects, safe off conductors</text_data><comment_date>2017-12-04T00:00:00</comment_date></row><row _id="row-4aqv~xpf9.7t7j" _uuid="00000000-0000-0000-A937-608E1B7EE470" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4aqv~xpf9.7t7j"><intent_id>649073</intent_id><project_id>737292</project_id><text_data>Russell Landscaping is responsible for installing sod. approximately 10,000 square feet of sod is to be installed.</text_data><comment_date>2014-08-19T00:00:00</comment_date></row><row _id="row-u54a_ukmd.jxz9" _uuid="00000000-0000-0000-F816-43316010FC63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u54a_ukmd.jxz9"><intent_id>532912</intent_id><project_id>692422</project_id><text_data>If this is State, than TV Truck operator works, but I am told Davis Bacon Wages may apply, can you tell me which one this job is?  General labor is still operating the camera remotely.</text_data><comment_date>2012-09-06T00:00:00</comment_date></row><row _id="row-g3r8.7ibn-hiqe" _uuid="00000000-0000-0000-DF19-0B28ED28F6E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g3r8.7ibn-hiqe"><intent_id>509313</intent_id><project_id>686612</project_id><text_data>Invoice #698255</text_data><comment_date>2012-04-25T00:00:00</comment_date></row><row _id="row-24n4~sppz-3w32" _uuid="00000000-0000-0000-F7C7-72C4F7593E05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-24n4~sppz-3w32"><intent_id>1005264</intent_id><project_id>892477</project_id><text_data>Filed by Michelle Lyons</text_data><comment_date>2019-09-06T00:00:00</comment_date></row><row _id="row-g5id_n9dr~fvyb" _uuid="00000000-0000-0000-A793-C5F42995A123" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g5id_n9dr~fvyb"><intent_id>889131</intent_id><project_id>844104</project_id><text_data>Filed by Paula Hunter - Project is exempt from state prevailing wage requirements based on the housing act of 1937 and CFR 965.101 Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2018-02-20T00:00:00</comment_date></row><row _id="row-7uk6_yimw~7hqu" _uuid="00000000-0000-0000-BD9F-9DB9A74E34B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7uk6_yimw~7hqu"><intent_id>618327</intent_id><project_id>730062</project_id><text_data>Job # C10308</text_data><comment_date>2014-02-28T00:00:00</comment_date></row><row _id="row-dsw2_82k4~se4g" _uuid="00000000-0000-0000-FCCB-91103616B333" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dsw2_82k4~se4g"><intent_id>800634</intent_id><project_id>806891</project_id><text_data>Haul storm drain waste to landfillDump truck and trailer to haul waste to the landfill</text_data><comment_date>2016-11-09T00:00:00</comment_date></row><row _id="row-f624~ducx_6s4p" _uuid="00000000-0000-0000-A4D0-CE8F2B77107D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f624~ducx_6s4p"><intent_id>943812</intent_id><project_id>865696</project_id><text_data>Quarterly Scale Calibration 3rd Quarter</text_data><comment_date>2018-11-03T00:00:00</comment_date></row><row _id="row-whtz_88tj~b3nr" _uuid="00000000-0000-0000-3D31-085CC3501B16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-whtz_88tj~b3nr"><intent_id>490433</intent_id><project_id>678708</project_id><text_data>The Ductless Heat Pump Installations are to be done at Single Family Homes. Each home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The Electricians will be installing a ductless heat pump. These jobs meets the residential job requirements.</text_data><comment_date>2011-11-22T00:00:00</comment_date></row><row _id="row-swz2~e5nh_x23f" _uuid="00000000-0000-0000-4CDB-250656614229" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-swz2~e5nh_x23f"><intent_id>984903</intent_id><project_id>869743</project_id><text_data>Blythe Job V-520</text_data><comment_date>2019-06-14T00:00:00</comment_date></row><row _id="row-hp57.zf5h-xkaj" _uuid="00000000-0000-0000-D18C-69C533A3D4D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hp57.zf5h-xkaj"><intent_id>1114834</intent_id><project_id>946363</project_id><text_data>? Install DOC and WaTech provided IP /SIP configurations onto VIP-204B and patch to DOC network.? Connect VIP-204B to DOC network and program paging zones within the VIP-102B configuration tool.? Wire VIP-204B outputs to wall field. Terminate cables on new 110 block.? Configure the following zones:o All Callo Zone-1 = 1st Flooro Zone-2 = 2nd Flooro Zone-3 = Emergency</text_data><comment_date>2021-01-12T00:00:00</comment_date></row><row _id="row-sbe7.ttb6-viwm" _uuid="00000000-0000-0000-5F5F-FB0AA7D6119C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sbe7.ttb6-viwm"><intent_id>1100203</intent_id><project_id>918336</project_id><text_data>Installation of Cat6 Data Cables for Security Camera Locations</text_data><comment_date>2020-10-30T00:00:00</comment_date></row><row _id="row-b59f-i6cg-3d8p" _uuid="00000000-0000-0000-F61F-C17D202C884B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b59f-i6cg-3d8p"><intent_id>783507</intent_id><project_id>800227</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2016-08-18T00:00:00</comment_date></row><row _id="row-gwu5_xip2-5v5p" _uuid="00000000-0000-0000-28D9-D833381EF232" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gwu5_xip2-5v5p"><intent_id>1186865</intent_id><project_id>978338</project_id><text_data>1121160</text_data><comment_date>2021-10-20T00:00:00</comment_date></row><row _id="row-sq6z.fyxk.n7cp" _uuid="00000000-0000-0000-DF17-4C0AB8608E07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sq6z.fyxk.n7cp"><intent_id>1255287</intent_id><project_id>1019057</project_id><text_data>PPC #22222</text_data><comment_date>2022-08-04T00:00:00</comment_date></row><row _id="row-3r7f.shij-rzqt" _uuid="00000000-0000-0000-12E5-65E8384FD6A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3r7f.shij-rzqt"><intent_id>1196452</intent_id><project_id>989935</project_id><text_data>sr51119342</text_data><comment_date>2021-12-01T00:00:00</comment_date></row><row _id="row-hhtj_ixq3.2pe3" _uuid="00000000-0000-0000-3D26-7EB2EF46C784" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hhtj_ixq3.2pe3"><intent_id>629140</intent_id><project_id>734760</project_id><text_data>The subcontractor will fabricate the work in their shop and then bring it to the site at the College where the artwork will be fastened to existing embedded eye-bolts in the walls which will be installed by the owner.  The artwork will be affixed using shackle end turnbuckles (an adjustable clipping mechanism).  The artwork is made from stainless steel and resin encased glass panels.</text_data><comment_date>2014-05-19T00:00:00</comment_date></row><row _id="row-jiz2~5dtr-nfe2" _uuid="00000000-0000-0000-F726-7EC08C8D84B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jiz2~5dtr-nfe2"><intent_id>1124690</intent_id><project_id>954526</project_id><text_data>This is a HUD Contract</text_data><comment_date>2021-02-24T00:00:00</comment_date></row><row _id="row-ewvt~yept~cprd" _uuid="00000000-0000-0000-D9E9-C1F800AE674B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ewvt~yept~cprd"><intent_id>1139889</intent_id><project_id>959823</project_id><text_data>Project# 02393, Beecroft, Beth, 5612 N Monroe, Spokane, WA 99205</text_data><comment_date>2021-05-06T00:00:00</comment_date></row><row _id="row-pzjy-7uvy~ydra" _uuid="00000000-0000-0000-8206-92664A63CAF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pzjy-7uvy~ydra"><intent_id>676773</intent_id><project_id>748728</project_id><text_data>HIRED BY SUB LEE CONTRACTORS</text_data><comment_date>2015-01-28T00:00:00</comment_date></row><row _id="row-jyuv.d2xt-heaq" _uuid="00000000-0000-0000-03BE-B77AEC86A330" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jyuv.d2xt-heaq"><intent_id>592463</intent_id><project_id>719509</project_id><text_data>FIled by Claudia Riedener.</text_data><comment_date>2013-09-09T00:00:00</comment_date></row><row _id="row-zrv3~ky6q_hqxs" _uuid="00000000-0000-0000-45F8-A00E5ADBB2B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zrv3~ky6q_hqxs"><intent_id>969740</intent_id><project_id>877638</project_id><text_data>Other trucks are low boys for hauling equipment</text_data><comment_date>2019-04-05T00:00:00</comment_date></row><row _id="row-36mx~r2kk.jvkj" _uuid="00000000-0000-0000-D233-7A82B77F04E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-36mx~r2kk.jvkj"><intent_id>546677</intent_id><project_id>700650</project_id><text_data>ALLIED'S JOB # 121130-0079PO # SPOKA-0000261810</text_data><comment_date>2012-11-30T00:00:00</comment_date></row><row _id="row-gx7p_2p8c-f6if" _uuid="00000000-0000-0000-C98B-6D373477A737" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gx7p_2p8c-f6if"><intent_id>748383</intent_id><project_id>777519</project_id><text_data>Fringe BreakdownLABORERS:  $11.23H &amp; W   = $6.10Pension = $4.50Training= $0.55Trust     = $0.08OPERATORS:  $13.55H &amp; W   = $6.15Pension = $6.75Training= $0.65TEAMSTERS:  $16.69H &amp; W   = $9.84Pension = $6.60Training= $0.25</text_data><comment_date>2016-02-24T00:00:00</comment_date></row><row _id="row-b9dg_9bg2_6aes" _uuid="00000000-0000-0000-492A-ED1DBE7A5B73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9dg_9bg2_6aes"><intent_id>1012606</intent_id><project_id>895405</project_id><text_data>01-KM02-MJ03-JM</text_data><comment_date>2019-10-07T00:00:00</comment_date></row><row _id="row-jx2u.knij-adnj" _uuid="00000000-0000-0000-1AC3-B0DB46767438" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jx2u.knij-adnj"><intent_id>829100</intent_id><project_id>768833</project_id><text_data>JCI Project #6N59-0201</text_data><comment_date>2017-04-26T00:00:00</comment_date></row><row _id="row-z8xz~ingx~9w3q" _uuid="00000000-0000-0000-5B05-9E83EECE02EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z8xz~ingx~9w3q"><intent_id>1155723</intent_id><project_id>968329</project_id><comment_date>2021-06-25T00:00:00</comment_date></row><row _id="row-xgc8.3pd8~9pzk" _uuid="00000000-0000-0000-AFD8-A7E9FF390468" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xgc8.3pd8~9pzk"><intent_id>761056</intent_id><project_id>784602</project_id><text_data>Annutiy $5.55 Pension $9.95  Health and Welfare $7.02  Apprenticeship program .67  IMPACT .25</text_data><comment_date>2016-05-16T00:00:00</comment_date></row><row _id="row-4sdv~caur.psa7" _uuid="00000000-0000-0000-C347-409D0529DB7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4sdv~caur.psa7"><intent_id>835542</intent_id><project_id>809145</project_id><text_data>HIRED BY STELLAR J CORP</text_data><comment_date>2017-05-22T00:00:00</comment_date></row><row _id="row-y6t9~wicq~qucs" _uuid="00000000-0000-0000-1C80-DC2651AB7EB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y6t9~wicq~qucs"><intent_id>804570</intent_id><project_id>808203</project_id><text_data>City of Vancouver JOC Contract</text_data><comment_date>2016-11-29T00:00:00</comment_date></row><row _id="row-swir-397k.5s9v" _uuid="00000000-0000-0000-1864-953F076504BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-swir-397k.5s9v"><intent_id>759719</intent_id><project_id>782942</project_id><text_data>INSTALLATION OF TREES &amp; SHRUBS, PLACING TOPSOIL AND COMPOST. SEEDING AND BARK FOR BEAUTIFICATION. ALL WORK TO BE DONE ON BOTH SIDES OF NEW ROADWAY.</text_data><comment_date>2016-05-02T00:00:00</comment_date></row><row _id="row-wfir-em87~56qg" _uuid="00000000-0000-0000-8A1A-6A06FBEDB500" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wfir-em87~56qg"><intent_id>1048213</intent_id><project_id>914040</project_id><text_data>Troubleshoot outlets and switchesSingle family dwellingonelivingnonoyesnonononononononononoyesno</text_data><comment_date>2020-03-27T00:00:00</comment_date></row><row _id="row-wvhb-hr2u_zkin" _uuid="00000000-0000-0000-EA3C-73719F88E524" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wvhb-hr2u_zkin"><intent_id>900438</intent_id><project_id>833660</project_id><text_data>All fringes paid in cash to the employee</text_data><comment_date>2018-04-24T00:00:00</comment_date></row><row _id="row-n3rp_9ifm~sgbk" _uuid="00000000-0000-0000-2453-702CCC822352" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n3rp_9ifm~sgbk"><intent_id>919579</intent_id><project_id>851360</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2018-07-19T00:00:00</comment_date></row><row _id="row-5z9j.5ykt~sp76" _uuid="00000000-0000-0000-41D1-323EED55DD5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5z9j.5ykt~sp76"><intent_id>1018963</intent_id><project_id>888752</project_id><text_data>2006 Western Star 49S TM 2 axle pump truck, 3600 gallon tank.  Onsite for emergency pumping of sewer line.</text_data><comment_date>2019-11-15T00:00:00</comment_date></row><row _id="row-haa2_dzkm_gg3c" _uuid="00000000-0000-0000-A954-19C45AB9D43E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-haa2_dzkm_gg3c"><intent_id>1189632</intent_id><project_id>985980</project_id><text_data>#1. The type of work that my firm was contracted to perform was to clean and repaint old railings for 12 different residences. #2. The structures were single-family dwellings.#3. Single-story structures.#4:(a)  No.(b) No.(c) Yes.(d) No.(e) No.(f) No.(g) No.(h) No.(i) No.(j) No.(k) No.(l) No.#5. Yes.#6. Yes.#7. No.#8. No.</text_data><comment_date>2021-11-16T00:00:00</comment_date></row><row _id="row-2z64~5vb3_idty" _uuid="00000000-0000-0000-A2A4-6E3079D9ACD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2z64~5vb3_idty"><intent_id>623832</intent_id><project_id>732567</project_id><text_data>see above notes...Installed 6 new data drops and relocated 3 existing drops.  Installed patch panel.  Labeled and tested.  Work done indoors.</text_data><comment_date>2014-04-11T00:00:00</comment_date></row><row _id="row-k2ca~u6r3_dcxu" _uuid="00000000-0000-0000-4E52-D7A73FE837B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k2ca~u6r3_dcxu"><intent_id>691360</intent_id><project_id>753951</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-04-28T00:00:00</comment_date></row><row _id="row-rnjg.wdn6_3557" _uuid="00000000-0000-0000-295E-DA0957ACC956" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rnjg.wdn6_3557"><intent_id>654038</intent_id><project_id>744198</project_id><text_data>6810</text_data><comment_date>2014-09-11T00:00:00</comment_date></row><row _id="row-4bhs_itdm.dxc6" _uuid="00000000-0000-0000-5A3A-91522B787CFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4bhs_itdm.dxc6"><intent_id>1170773</intent_id><project_id>975865</project_id><text_data>CALL JOSHWITH ANY QUESTIONS @ 865-2069</text_data><comment_date>2021-08-19T00:00:00</comment_date></row><row _id="row-fpn7.8dtr-6zgg" _uuid="00000000-0000-0000-C496-4235B887531C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fpn7.8dtr-6zgg"><intent_id>1091327</intent_id><project_id>817030</project_id><text_data>301SNH0640 - INTENT</text_data><comment_date>2020-09-27T00:00:00</comment_date></row><row _id="row-864m-wgw8~23pc" _uuid="00000000-0000-0000-EBE4-F5D2DE72AD36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-864m-wgw8~23pc"><intent_id>1124852</intent_id><project_id>952039</project_id><text_data>SRO 1910905</text_data><comment_date>2021-02-25T00:00:00</comment_date></row><row _id="row-v6k8_v6aa-vcis" _uuid="00000000-0000-0000-175F-9F6B14B16A80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v6k8_v6aa-vcis"><intent_id>640515</intent_id><project_id>736442</project_id><text_data>044160</text_data><comment_date>2014-07-11T00:00:00</comment_date></row><row _id="row-u9wv.xip9-3ay7" _uuid="00000000-0000-0000-7AFC-07F4654BEE17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u9wv.xip9-3ay7"><intent_id>892017</intent_id><project_id>845449</project_id><text_data>This was reported to us from Centerstone to be an electric furnace. We have not been able to schedule the appointment with client yet to ascertain the type of furnace and to conduct the work. Let me know if you need additional information.</text_data><comment_date>2018-03-29T00:00:00</comment_date></row><row _id="row-8rxc.uek5-cjt4" _uuid="00000000-0000-0000-0C62-B7036DA5F16A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8rxc.uek5-cjt4"><intent_id>1278219</intent_id><project_id>1037279</project_id><text_data>SC 220617-0019</text_data><comment_date>2022-10-27T00:00:00</comment_date></row><row _id="row-k8wu.pddd.ivrb" _uuid="00000000-0000-0000-953F-52DB5F1D27BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k8wu.pddd.ivrb"><intent_id>532767</intent_id><project_id>695353</project_id><text_data>Truck Drivers, Other Trucks, 4,000gall water truck.</text_data><comment_date>2012-09-05T00:00:00</comment_date></row><row _id="row-x2f2-xdh7~ktj4" _uuid="00000000-0000-0000-E345-5E4C410F5FED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x2f2-xdh7~ktj4"><intent_id>864074</intent_id><project_id>833094</project_id><text_data>0817076</text_data><comment_date>2017-09-20T00:00:00</comment_date></row><row _id="row-qnxt-w4sz_ftzu" _uuid="00000000-0000-0000-5C46-8DF7C65C64BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qnxt-w4sz_ftzu"><intent_id>509272</intent_id><project_id>680956</project_id><text_data>Form filed by: Ken Rustia - murq235</text_data><comment_date>2012-04-25T00:00:00</comment_date></row><row _id="row-aabf~y46u-i92p" _uuid="00000000-0000-0000-5D9F-045FEE3A3D42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aabf~y46u-i92p"><intent_id>1028886</intent_id><project_id>864359</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project? RENOVATION OF EXISTING BUILDING.... 2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? NOT BY ELECTRICAL RELIABILITY SERVICES.......3. Does this specific project entail the remodeling or new construction of a facility? UNSURE. OUR PART WAS VERY MINOR.......4. If your firm is working upon a type of building system, what type of system is involved? ELECTRICAL5. What specific tasks did your employees perform? USING A GROUND RESISTANCE METER, OUR EMPLOYEES WILL MEASURE FROM PIECES OF ELECTRICAL DISTRIBUION EQUIPMENT BACK TO A KNOWN GROUND TO INSURE THE PIECES OF ELECTRICAL EQUIPMENT ARE PROPERLY GROUNDED. CONNECTIONS ARE MADE VIA ALLIGATOR CLIPS ON THE END OF WIRES FROM THE TEST SET. TYPICALLY A VERY LOW RESISTANCE IS MEASURED AND RECORDED FOR A REPORT TO BE WRITTEN LATER. 6. Will your employee&amp;#39;s work require the physical modification to the electrical system wiring including connection and disconnection, temporary or permanent?? NO..7. Will your employees require the use of a screwdriver, wrench or any other handheld tool besides a multimeter?? NO...8. If your employees use no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? NO TOOLS WILL BE USED. A TEST SET WEIGHING LESS THAN  5 POUNDS WILL BE CARRIED FROM A TRUCK TO THE EQUIPMENT TO BE CHECKED.....9. Will your employees perform any work that requires and electrical license or certification under Chapter 296-46B WAC?? NO....10. Are you going to be hiring any subcontractors for this project? NO.....</text_data><comment_date>2019-12-27T00:00:00</comment_date></row><row _id="row-5j5i_ms5k-9tsk" _uuid="00000000-0000-0000-0F70-6BE2504EFE68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5j5i_ms5k-9tsk"><intent_id>774063</intent_id><project_id>794696</project_id><text_data>Filed by James L. Ward Jr.This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2016-07-12T00:00:00</comment_date></row><row _id="row-ibmr_n2ar_ie7c" _uuid="00000000-0000-0000-52D5-67AF4BAD1762" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ibmr_n2ar_ie7c"><intent_id>912919</intent_id><project_id>854028</project_id><text_data>WO #8039072</text_data><comment_date>2018-06-21T00:00:00</comment_date></row><row _id="row-y699~bfjf_676h" _uuid="00000000-0000-0000-BE0A-02987354C4DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y699~bfjf_676h"><intent_id>881924</intent_id><project_id>840744</project_id><text_data>This is the Intent for work done in 2018 for the On-call Tree Removal contract with the City of Olympia.Bram Granger / Treewalker, LLC can be contacted at 360-481-5330.  The number above 360-269-2214 is an old number and no longer exist.</text_data><comment_date>2018-01-04T00:00:00</comment_date></row><row _id="row-igzu-tgrw~fhjd" _uuid="00000000-0000-0000-1479-EF3A6DB8B2B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-igzu-tgrw~fhjd"><intent_id>548513</intent_id><project_id>701480</project_id><text_data>Work was performed at multiple locations as follows:1512 Moses Stool Rd - Rock Island, WA19 Sand Pit Rd - Grand Coulee Dam, WAPearl Mt - Bridgeport, WAGoat Mt - Pateros, WA</text_data><comment_date>2012-12-13T00:00:00</comment_date></row><row _id="row-rvkd.t93j-dkes" _uuid="00000000-0000-0000-D564-5B90B849CE7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rvkd.t93j-dkes"><intent_id>714615</intent_id><project_id>769548</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2015-08-14T00:00:00</comment_date></row><row _id="row-qva6_tn8s_rk68" _uuid="00000000-0000-0000-8C18-D629C242FB96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qva6_tn8s_rk68"><intent_id>1057938</intent_id><project_id>918948</project_id><text_data>Two Intents have been filed for the Spokane Library Liberty and Hive Branches in cause of two separate contract values and locations. The Hive Branch Intent Number is 1057930.  -SM</text_data><comment_date>2020-05-14T00:00:00</comment_date></row><row _id="row-i75f-azn4_sx74" _uuid="00000000-0000-0000-5578-3D50B5CE9F29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i75f-azn4_sx74"><intent_id>499011</intent_id><project_id>673386</project_id><text_data>Form filed by: Derik Sterling</text_data><comment_date>2012-02-02T00:00:00</comment_date></row><row _id="row-pjzk.9tc9~sddp" _uuid="00000000-0000-0000-808D-5DD15AA30EB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjzk.9tc9~sddp"><intent_id>1245654</intent_id><project_id>1016266</project_id><text_data>NW PENSION          10.00    LOCAL APPR            1.10    HEALTH CARE / VEB          13.46    ORG TRUST            1.00    IND FUND            0.65    NATL PENSION            4.24    ITI/NEMI/SMOHI            0.17    NW SUPPLEMENTAL            0.79    CLEAN CARD            0.07         TOTAL          31.48            BT Journeyman</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-5b3u_2iw3-nren" _uuid="00000000-0000-0000-58BD-4F2A41642EC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5b3u_2iw3-nren"><intent_id>676750</intent_id><project_id>743671</project_id><text_data>125003</text_data><comment_date>2015-01-28T00:00:00</comment_date></row><row _id="row-xrgs.urue~y689" _uuid="00000000-0000-0000-450B-BC953B73A932" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xrgs.urue~y689"><intent_id>761350</intent_id><project_id>785011</project_id><text_data>Sprinkler system and landscaping for existing school, depth of less than 3 feet. No swales, no stream restoration control, no erosion control, no highway beautification.</text_data><comment_date>2016-05-10T00:00:00</comment_date></row><row _id="row-75hn~vv8g_2hc2" _uuid="00000000-0000-0000-02D9-20EB28D92165" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-75hn~vv8g_2hc2"><intent_id>505134</intent_id><project_id>684477</project_id><text_data>Judy Smith131 S Meadow LnLynden, WA 98264</text_data><comment_date>2012-03-23T00:00:00</comment_date></row><row _id="row-5kpw~b2rs.esyp" _uuid="00000000-0000-0000-6970-37EC32FEA0D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5kpw~b2rs.esyp"><intent_id>582148</intent_id><project_id>715808</project_id><text_data>Mechanical and Electrical repair to the HVAC system at the District Market.</text_data><comment_date>2013-07-19T00:00:00</comment_date></row><row _id="row-nui3~8gpu_vhya" _uuid="00000000-0000-0000-E45F-D0F86B418B74" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nui3~8gpu_vhya"><intent_id>876035</intent_id><project_id>837978</project_id><text_data>Filed by Charlie Alexander</text_data><comment_date>2017-11-21T00:00:00</comment_date></row><row _id="row-d6ph_a298.yf8c" _uuid="00000000-0000-0000-13BD-BAE6C0D04297" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d6ph_a298.yf8c"><intent_id>1054904</intent_id><project_id>910144</project_id><text_data>According union and International intentions for Hydroelectric classifications, during the Generator disassembly; field assembly of stator frame, core, and winding; and unit reassembly activities.,� ONLY the winding is considered electrical. The stator frame, core and all disassembly and reassembly activities are millwright work. The work involved for disassembly and assemblies of equipment is and has always been millwright work and classified as such.</text_data><comment_date>2020-05-07T00:00:00</comment_date></row><row _id="row-wcr6~4y4s_434m" _uuid="00000000-0000-0000-CC55-7E03F6FA3E8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wcr6~4y4s_434m"><intent_id>1161228</intent_id><project_id>954833</project_id><text_data>semi trucks hauling concrete girders</text_data><comment_date>2021-07-19T00:00:00</comment_date></row><row _id="row-c3ut_hnwx.ew5m" _uuid="00000000-0000-0000-00B2-B30F2BF2FC75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c3ut_hnwx.ew5m"><intent_id>1187556</intent_id><project_id>980854</project_id><text_data>#1 electrical scope: wiring to heat pump#2 single family dwelling#3 single story home#4a. nob. noc. yesd. noe. nof. nog. noh. noi. noj. nok. nol. no#5 yes#6 yes#7 no#8 no</text_data><comment_date>2021-10-22T00:00:00</comment_date></row><row _id="row-jhun_zij7_jahk" _uuid="00000000-0000-0000-72D6-3D093E6A4DC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jhun_zij7_jahk"><intent_id>743962</intent_id><project_id>783804</project_id><text_data>Respond to and clean non PCB transformer spillHazWaste worker to clean and clear area of all debris using brooms, shovels and/or rags spongesTruck, Vacuum to vacuum contaminated liquids.</text_data><comment_date>2016-01-28T00:00:00</comment_date></row><row _id="row-yrux-km9i_w67f" _uuid="00000000-0000-0000-D317-61D3B7FD497D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yrux-km9i_w67f"><intent_id>982620</intent_id><project_id>883235</project_id><text_data>Replacing Hydronic Heaters at Kelso High School</text_data><comment_date>2019-06-11T00:00:00</comment_date></row><row _id="row-5rnd_ssy3~47rg" _uuid="00000000-0000-0000-74CC-F0F892CB068E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5rnd_ssy3~47rg"><intent_id>589269</intent_id><project_id>718341</project_id><text_data>Filed by Antonio Mireles</text_data><comment_date>2013-08-22T00:00:00</comment_date></row><row _id="row-fysi~z8vm-adbu" _uuid="00000000-0000-0000-FCFB-22636D0A7EDE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fysi~z8vm-adbu"><intent_id>617963</intent_id><project_id>721787</project_id><text_data>Mortenson hired us</text_data><comment_date>2014-02-26T00:00:00</comment_date></row><row _id="row-f9kt.eau2_hubc" _uuid="00000000-0000-0000-AF44-AC98E6CF51DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f9kt.eau2_hubc"><intent_id>970306</intent_id><project_id>874808</project_id><text_data>FILED BY JOSE VAZQUEZ</text_data><comment_date>2019-04-08T00:00:00</comment_date></row><row _id="row-5jcq.u4tm~ddhh" _uuid="00000000-0000-0000-5618-EC655458E34A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5jcq.u4tm~ddhh"><intent_id>1120058</intent_id><project_id>949296</project_id><text_data>Elect tech(06)Inside workAdditional cable drops for CCTV</text_data><comment_date>2021-02-04T00:00:00</comment_date></row><row _id="row-agj6~ugm2~nhwq" _uuid="00000000-0000-0000-0601-4E9804CF8A39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-agj6~ugm2~nhwq"><intent_id>878960</intent_id><project_id>836438</project_id><text_data>Install (1) each dual data and (1) each wireless access point to (2) portable classrooms and (1) 6-strand fiber from MDF to new portable, Low voltage, Indoor</text_data><comment_date>2017-12-13T00:00:00</comment_date></row><row _id="row-mpkz~e3sp_gztq" _uuid="00000000-0000-0000-8EB3-903DE80093AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpkz~e3sp_gztq"><intent_id>1067045</intent_id><project_id>913176</project_id><text_data>480153</text_data><comment_date>2020-06-22T00:00:00</comment_date></row><row _id="row-23b3-q6am-puzn" _uuid="00000000-0000-0000-44E0-381A06CE6BE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-23b3-q6am-puzn"><intent_id>1168654</intent_id><project_id>915904</project_id><text_data>Fringe: Vacation $4.62; Holiday Pay $1.91; Health &amp; Welfare $15.875; Pension $10.46; Educational Fund $0.64; Preservation Fund $0.54; Annuity $8.85</text_data><comment_date>2021-08-20T00:00:00</comment_date></row><row _id="row-fs48-5xtk.va9t" _uuid="00000000-0000-0000-999E-F75459ABAF2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fs48-5xtk.va9t"><intent_id>855144</intent_id><project_id>830079</project_id><text_data>PTI SO 135044</text_data><comment_date>2017-08-16T00:00:00</comment_date></row><row _id="row-f8an_acs6.4zht" _uuid="00000000-0000-0000-7FFF-BBBA3695B49B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f8an_acs6.4zht"><intent_id>521330</intent_id><project_id>688847</project_id><text_data>JOURNEYMEN WORKED ON THIS PROJECT</text_data><comment_date>2012-07-10T00:00:00</comment_date></row><row _id="row-cjsz.bb35~c8yr" _uuid="00000000-0000-0000-3513-D77169465D47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjsz.bb35~c8yr"><intent_id>1253922</intent_id><project_id>1019317</project_id><text_data>Salish Networks is a 100% Tulalip Tribes owned company located within the bounds of the Tulalip Reservation. The Tribe and all business entities are exempt from Washington State Workers Compensation Insurance Requirements. All employees are covered under Tribal First Insurance. Work will be conducted inside and on the customer side of phone/data demark. Installation will include Network cabling to support voice and data application for personal desktop computer systems, desk phones and associated devices such as printers and desktop fax machines. Installation of data racks, patch panels, vertical and horizontal wire managements.</text_data><comment_date>2022-08-01T00:00:00</comment_date></row><row _id="row-kau9.ayqv.tb9k" _uuid="00000000-0000-0000-77E4-B398833DBECF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kau9.ayqv.tb9k"><intent_id>1195280</intent_id><project_id>973215</project_id><text_data>The material being spread is not concrete, Shotcrete or Gunite. The material is not under high pressure, it is not a water blaster or a vacuum blaster and we are not performing any green cutting with high pressure water &amp; high pressure air.Our duties for a project are to bring playground wood chip material in our truck to a facility where everything is marked and ready for Swanson employee(s) to take a hose and blow the playground chips on existing playgrounds where they tell us. Once the playground chips are spread out on the playground surface we use a blower similar to a leaf blower to clean up the area around the playground surface.We may use one of two trucks: Truck &amp; Trailer � Truck = Kenworth T-800 4 axle Trailer = IMCO live floor trailer 48� Truck � Freightliner FL80 2 rear axles</text_data><comment_date>2021-11-24T00:00:00</comment_date></row><row _id="row-czqk.3vsu~kucx" _uuid="00000000-0000-0000-37AB-E1DE235301B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-czqk.3vsu~kucx"><intent_id>700102</intent_id><project_id>760671</project_id><text_data>State Prevailing wage portion of work (community building) performed by owner operators</text_data><comment_date>2015-06-11T00:00:00</comment_date></row><row _id="row-5nj7-f9mg_rcwp" _uuid="00000000-0000-0000-5BDB-6A8033E7F918" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5nj7-f9mg_rcwp"><intent_id>874525</intent_id><project_id>837347</project_id><text_data>This is a riparian restoration project. The goal is to establish native plants, trees, and shrubs on a plot of ground in the vicinity of water (creek, river, pond, or lake) that has been taken over by non-native species. Our specific jobs on this project are:1.	maintenance mowing: removing competing non-native plants by mowing with walk-behind mowers &amp;/or mowing with weed wackers.2.	tube qc: applying tree protectors to planted trees &amp; shrubs, walking through planted sites, removing and collecting tubes from plants that no longer need them, or adjusting or replacing tubes and reaffixing them to stakes.</text_data><comment_date>2017-11-13T00:00:00</comment_date></row><row _id="row-ngsn_vhvz-2u7e" _uuid="00000000-0000-0000-F069-2378A6CA519D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ngsn_vhvz-2u7e"><intent_id>670181</intent_id><project_id>750926</project_id><text_data>Job # 9018411</text_data><comment_date>2014-12-16T00:00:00</comment_date></row><row _id="row-92zk-i5gs-er9b" _uuid="00000000-0000-0000-3341-6585C2648DC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-92zk-i5gs-er9b"><intent_id>976488</intent_id><project_id>879101</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2019-05-07T00:00:00</comment_date></row><row _id="row-whau.d5jf~db44" _uuid="00000000-0000-0000-A439-97CBF9C90232" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-whau.d5jf~db44"><intent_id>1268679</intent_id><project_id>1032160</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-10-28T00:00:00</comment_date></row><row _id="row-wku8~d6pr.zk3h" _uuid="00000000-0000-0000-9820-F3F36B27D98B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wku8~d6pr.zk3h"><intent_id>448721</intent_id><project_id>663195</project_id><text_data>After an internal audit, we realized that we never filed an intent for this project.</text_data><comment_date>2011-03-28T00:00:00</comment_date></row><row _id="row-z962_rjxz.kv5k" _uuid="00000000-0000-0000-EC6B-3D1AE4D7736F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z962_rjxz.kv5k"><intent_id>837708</intent_id><project_id>798987</project_id><text_data>Project is Additons and Renovations to the middle school.  Our scope of work will to hydroseed lawn areas with a 75hp Bowie hydroseeder and drill seed lawn areas with a brillion seeder pulled behind 45hp John Deere tractor.</text_data><comment_date>2017-06-02T00:00:00</comment_date></row><row _id="row-9x9p~rrp8.nvxe" _uuid="00000000-0000-0000-54BA-1230522081E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9x9p~rrp8.nvxe"><intent_id>840786</intent_id><project_id>824469</project_id><text_data>Grind interior of drain flange and remove laminate contaminations. Install new drain flange and add new liner to floor</text_data><comment_date>2017-06-23T00:00:00</comment_date></row><row _id="row-fa33~rnhc.raet" _uuid="00000000-0000-0000-7911-8F21CB4E634D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fa33~rnhc.raet"><intent_id>624591</intent_id><project_id>732888</project_id><text_data>landscape labor will consist of the use of wheel barrows and shovels to move small amount of dirt</text_data><comment_date>2014-04-11T00:00:00</comment_date></row><row _id="row-424s~7zjx_yi7n" _uuid="00000000-0000-0000-BA59-70A8BF3A7BC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-424s~7zjx_yi7n"><intent_id>575916</intent_id><project_id>713533</project_id><text_data>The project consists of the following work:  Improvements to the park including removal of existing sod and topsoil, removal of existing asphalt basketball court and widen area to accommodate new asphalt court andstrip.  Install two new basketball goals.  Pour two concrete pads and install new benches.  Spread topsoil, seed and fertilize to restore area disturbed.</text_data><comment_date>2013-06-18T00:00:00</comment_date></row><row _id="row-mr38-wxhd~6pd7" _uuid="00000000-0000-0000-A820-4649E824191F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mr38-wxhd~6pd7"><intent_id>648845</intent_id><project_id>742195</project_id><text_data>Form filed by: Albert Miller</text_data><comment_date>2014-08-19T00:00:00</comment_date></row><row _id="row-n5cn.ga2i-ktmy" _uuid="00000000-0000-0000-03B0-6F8EEEFC1A68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n5cn.ga2i-ktmy"><intent_id>941480</intent_id><project_id>864729</project_id><text_data>We did pressure washing of walls at the Middle school.</text_data><comment_date>2018-10-23T00:00:00</comment_date></row><row _id="row-jcnm.b67t.knu4" _uuid="00000000-0000-0000-5850-724C93626249" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jcnm.b67t.knu4"><intent_id>1090191</intent_id><project_id>910958</project_id><text_data>AIRTEST Job #20-0236-1</text_data><comment_date>2020-09-22T00:00:00</comment_date></row><row _id="row-cub6.d89g.a9qi" _uuid="00000000-0000-0000-6916-6FB0F9527DBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cub6.d89g.a9qi"><intent_id>777107</intent_id><project_id>791426</project_id><text_data>Telephone Cabling   (wi-fi)Work will be done indoors</text_data><comment_date>2016-07-29T00:00:00</comment_date></row><row _id="row-vfjs-3p7h~2y3p" _uuid="00000000-0000-0000-607B-1E0FE23B527C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfjs-3p7h~2y3p"><intent_id>829670</intent_id><project_id>819393</project_id><text_data>Trucks will be class 8 semi tractor with trailers</text_data><comment_date>2017-05-11T00:00:00</comment_date></row><row _id="row-zy4b-jxa7~pgp7" _uuid="00000000-0000-0000-9E81-2576BA69D8AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zy4b-jxa7~pgp7"><intent_id>570251</intent_id><project_id>711278</project_id><text_data>Jacob MillerWalt SpindalGary Sargent</text_data><comment_date>2013-05-17T00:00:00</comment_date></row><row _id="row-q9jc_n356~i7xr" _uuid="00000000-0000-0000-1600-2E06B06E5736" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9jc_n356~i7xr"><intent_id>680173</intent_id><project_id>754179</project_id><text_data>1) Replace water fitting. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f)No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) Yes - manager office. 8) No.</text_data><comment_date>2015-02-20T00:00:00</comment_date></row><row _id="row-qyb6~repk~qma5" _uuid="00000000-0000-0000-8648-5DEC524613C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qyb6~repk~qma5"><intent_id>1085171</intent_id><project_id>931331</project_id><text_data>Invoice #125617 drain cleaning</text_data><comment_date>2020-09-01T00:00:00</comment_date></row><row _id="row-6ci9-7tc7.qqgc" _uuid="00000000-0000-0000-EBA5-8ECA4B2B3AF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ci9-7tc7.qqgc"><intent_id>860347</intent_id><project_id>829639</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborers Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2017-09-01T00:00:00</comment_date></row><row _id="row-sst3.ugxx~uuua" _uuid="00000000-0000-0000-EAEC-FC92E5A8507C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sst3.ugxx~uuua"><intent_id>1132037</intent_id><project_id>946721</project_id><text_data>General labor work consists of hand work (shovel work) no power equipment or power tools. Blade Operator is used for grading the project site for compaction before paving and/or chip sealing operations. Other trucks consist of a 0-8,000 gallon water truck used for water distribution during the grading process to help with compaction. Crane Oiler � the actual piece of equipment being operated is an Oil Distributor truck and the wage band approach was utilized, as per Harvey Means from L&amp;I.</text_data><comment_date>2021-03-29T00:00:00</comment_date></row><row _id="row-6vyy~5aaa-ynkf" _uuid="00000000-0000-0000-FE1C-2B5A2CD24D2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6vyy~5aaa-ynkf"><intent_id>1096174</intent_id><project_id>936405</project_id><text_data>01-GS02-AB03-MJ</text_data><comment_date>2020-10-15T00:00:00</comment_date></row><row _id="row-nc3z-d2mh-u3dx" _uuid="00000000-0000-0000-1249-749CACF00576" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nc3z-d2mh-u3dx"><intent_id>1127441</intent_id><project_id>953546</project_id><text_data>Grounds Keepers will be mowing and maintaining the lawn using push mowers and hand held string trimmers</text_data><comment_date>2021-03-09T00:00:00</comment_date></row><row _id="row-c88v_ku39-g66c" _uuid="00000000-0000-0000-4F30-46A8371FB0B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c88v_ku39-g66c"><intent_id>1172537</intent_id><project_id>975543</project_id><text_data>General laborer is hand work only (no power tools or equipment) $34.03 base + $8.51 pensionCrane Oiler/Driver is and oil distributor. Wage band approach is being utilized per Harvey Means. $38.29 base + $9.57 pensionOther trucks consists of a 0 to 8,000 gallon water truck used to help with compaction and dust control. $39.51 base + $9.88 pension</text_data><comment_date>2021-08-26T00:00:00</comment_date></row><row _id="row-ingb~htvs.eeaq" _uuid="00000000-0000-0000-4918-91088E3113C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ingb~htvs.eeaq"><intent_id>1284940</intent_id><project_id>1041705</project_id><text_data>9897975</text_data><comment_date>2022-11-19T00:00:00</comment_date></row><row _id="row-f4b2-xp7u~fy68" _uuid="00000000-0000-0000-CFA3-2C9839D39C0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f4b2-xp7u~fy68"><intent_id>1191760</intent_id><project_id>987158</project_id><text_data>WO#26056 Job#2733</text_data><comment_date>2021-11-08T00:00:00</comment_date></row><row _id="row-5aug_67m7-kyg7" _uuid="00000000-0000-0000-6225-04DD2F4D12DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5aug_67m7-kyg7"><intent_id>1146503</intent_id><project_id>963359</project_id><text_data>three year contract which may be extended.</text_data><comment_date>2021-05-20T00:00:00</comment_date></row><row _id="row-urui.uat6_kpuk" _uuid="00000000-0000-0000-B426-0CD2C212A010" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-urui.uat6_kpuk"><intent_id>713309</intent_id><project_id>769539</project_id><text_data>GENERAL LABORERS WILL BE MOVING DIRT AND OTHER MATERIALS WITH RAKES AND SHOVELS.  WATER TRUCK WILL BE USED FOR DUST CONTROL.</text_data><comment_date>2015-08-10T00:00:00</comment_date></row><row _id="row-qp82~xvbr~iiak" _uuid="00000000-0000-0000-E2F1-F7FADD3ECB22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qp82~xvbr~iiak"><intent_id>1094888</intent_id><project_id>922555</project_id><text_data>Schneider &amp; Sons hired us</text_data><comment_date>2020-10-10T00:00:00</comment_date></row><row _id="row-en4r-h2si~d899" _uuid="00000000-0000-0000-C3F0-A15ABC872A9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-en4r-h2si~d899"><intent_id>853500</intent_id><project_id>829458</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.</text_data><comment_date>2017-08-08T00:00:00</comment_date></row><row _id="row-nyxp~h9td~vk9x" _uuid="00000000-0000-0000-FC22-1129791DBEA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nyxp~h9td~vk9x"><intent_id>644641</intent_id><project_id>727008</project_id><text_data>Prime Job# 314-3449; construction of light pole bases</text_data><comment_date>2014-07-30T00:00:00</comment_date></row><row _id="row-3uja-vqrw-6a77" _uuid="00000000-0000-0000-5909-9F8731291191" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3uja-vqrw-6a77"><intent_id>608645</intent_id><project_id>725697</project_id><text_data>1) Install a Coleman EB15 Manufactured home furnace with 15KW heat2) Other residential structure (Manufactured home)3) No basement or garage and is single story4)   (a) No   (b) No   (c) No   (d) No   (e) No   (f) No   (g) No   (h) No   (i) Yes   (j) No   (k) No5) Yes6) Yes7) No8) No</text_data><comment_date>2013-12-16T00:00:00</comment_date></row><row _id="row-r279-u47b_7p79" _uuid="00000000-0000-0000-64F1-243001AF1B5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r279-u47b_7p79"><intent_id>486389</intent_id><project_id>677200</project_id><text_data>Job # 164243</text_data><comment_date>2011-10-28T00:00:00</comment_date></row><row _id="row-abma_uj8d~3pvf" _uuid="00000000-0000-0000-EB66-C03E2A8F6FB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-abma_uj8d~3pvf"><intent_id>516162</intent_id><project_id>688023</project_id><text_data>Martin, Thank you for the additional information.  Based on the information you have provided, we have decided that there is sufficient information to support the approval of your form as submitted.  This is primarily based on my understanding that the cleanup work is sufficiently separate from the work that is to be carried out under the ironworker scope.  As we discussed, however, any additional cleanup in connection with this work is likely to require the Ironworkers classification, including cleanup during and incidental to the work under the Ironworkers classification.  Please note that the approval of the form is based on the information provided, and does not guarantee a similar finding in the event of a future complaint or investigation.  If any additional information becomes apparent, the above assessment may change. Thank you for your interest in complying with Washington�s prevailing wage law.</text_data><comment_date>2012-06-22T00:00:00</comment_date></row><row _id="row-suer~b7n3_8z3x" _uuid="00000000-0000-0000-78CB-BB1D8E6C398C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-suer~b7n3_8z3x"><intent_id>823191</intent_id><project_id>816702</project_id><text_data>#1 - Install mini split ductless heat pump #2 - single family dwelling #3 - 2 stories #4 - What is the building used for?: (a) No (b) NO (c) Yes (d) No (e) No (f) No (g) NO (h) No (I) No (j) No (k) NO (l) NO #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2017-03-28T00:00:00</comment_date></row><row _id="row-q75t-rbbu-333s" _uuid="00000000-0000-0000-FBB2-6F9CD5CD404E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q75t-rbbu-333s"><intent_id>567685</intent_id><project_id>697352</project_id><text_data>Filed by: Ron Walden</text_data><comment_date>2013-05-02T00:00:00</comment_date></row><row _id="row-nqe6-q86m-jpbw" _uuid="00000000-0000-0000-BF4C-7C58990FA21B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nqe6-q86m-jpbw"><intent_id>768016</intent_id><project_id>794324</project_id><text_data>Project scope: 1. Remove play equipment. 2. Remove existing cedar chip. 3. Add gravel in preparation for synthetic turf. 4. Pour concrete turf edge. 5. Remove/Replace/Add landscape plantings. 6. Install decorative landscape rock. 7. Install (re-used) cedar chip. 8. Modify existing fencing.</text_data><comment_date>2016-06-13T00:00:00</comment_date></row><row _id="row-5cjf_cuud~kexc" _uuid="00000000-0000-0000-3C5D-F07743B713F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5cjf_cuud~kexc"><intent_id>700636</intent_id><project_id>764828</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-06-15T00:00:00</comment_date></row><row _id="row-g4cn_zq5v-ur6v" _uuid="00000000-0000-0000-0DA2-5B703D43B48F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g4cn_zq5v-ur6v"><intent_id>830523</intent_id><project_id>814462</project_id><text_data>Install telephone Data cables inside buildings</text_data><comment_date>2017-05-03T00:00:00</comment_date></row><row _id="row-py7f_x3z7.3enx" _uuid="00000000-0000-0000-5DE3-B31AA764AC3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-py7f_x3z7.3enx"><intent_id>335209</intent_id><project_id>660892</project_id><text_data>Penhall JOb 230598INdustrial #  59087701Oil truck for petro mat installationgeneral labor will be laying fabric.</text_data><comment_date>2011-06-09T00:00:00</comment_date></row><row _id="row-7nq6-tn24_2fgv" _uuid="00000000-0000-0000-F3AA-E58EC6913D14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7nq6-tn24_2fgv"><intent_id>974706</intent_id><project_id>842059</project_id><text_data>FILED BY WILLIAM T HAMILTON</text_data><comment_date>2019-04-30T00:00:00</comment_date></row><row _id="row-jb6z.hk63_fznf" _uuid="00000000-0000-0000-C4FC-77288F0FA576" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jb6z.hk63_fznf"><intent_id>691576</intent_id><project_id>761013</project_id><text_data>Filed by Laura L Kickbusch</text_data><comment_date>2015-04-29T00:00:00</comment_date></row><row _id="row-bqrf-56gi.v57g" _uuid="00000000-0000-0000-F825-7B47E49C6571" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bqrf-56gi.v57g"><intent_id>788254</intent_id><project_id>792028</project_id><text_data>Columbia Gardens Wine Village Phase 1</text_data><comment_date>2016-09-09T00:00:00</comment_date></row><row _id="row-rseq-n4ke_y5ra" _uuid="00000000-0000-0000-DDA3-D85FC54B87DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rseq-n4ke_y5ra"><intent_id>956423</intent_id><project_id>871378</project_id><text_data>General labor work consists of hand work only (shovel work) Pilot Car is used for mobilizing heavy equipment to and from the project site. Motor patrol grader is used to grade the project site for compaction before paving operations. Water truck is used for distribution of water during the grading process to help with compaction.</text_data><comment_date>2019-01-22T00:00:00</comment_date></row><row _id="row-gg4k_gend~u9n7" _uuid="00000000-0000-0000-2B04-E6B53EF9E41D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gg4k_gend~u9n7"><intent_id>817798</intent_id><project_id>814271</project_id><text_data>021,782-00</text_data><comment_date>2017-03-10T00:00:00</comment_date></row><row _id="row-hami_sd4c-iw6q" _uuid="00000000-0000-0000-A09F-D9821DB56A01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hami_sd4c-iw6q"><intent_id>799137</intent_id><project_id>805802</project_id><text_data>The duties to be performed by the General Laborer are: removing carpet, ceiling tile, and 1 section of wall. The tools to be used by the General Laborer are: Spud Bar, carpet cutters, hammers, brooms, dustpans.</text_data><comment_date>2016-11-01T00:00:00</comment_date></row><row _id="row-m7xe_286b-q5xg" _uuid="00000000-0000-0000-E0CC-B06703BB274D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7xe_286b-q5xg"><intent_id>1318642</intent_id><project_id>1062729</project_id><text_data>W1501332A - Intent</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-hyw4.as2r_7crs" _uuid="00000000-0000-0000-49AF-3ACF295F1326" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hyw4.as2r_7crs"><intent_id>501871</intent_id><project_id>678856</project_id><text_data>This Intent will ultimately replace Intent #501073 which had an error on it.</text_data><comment_date>2012-02-27T00:00:00</comment_date></row><row _id="row-fz48_2946~wgvt" _uuid="00000000-0000-0000-E6BE-61F8C4803F13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fz48_2946~wgvt"><intent_id>497054</intent_id><project_id>671456</project_id><text_data>Our scope of work includes revising/installing irrigation system (depth &amp;lt;25&amp;quot;), planting trees and shrubs, and intalling sod using typical landscape equipment and tools such as an 18hp trencher, sod cutter, compact 35hp skid steer, wheelbarrow, motorized 18hp buggy, and hand tools.</text_data><comment_date>2012-01-16T00:00:00</comment_date></row><row _id="row-4fhr.yr5t_ng5n" _uuid="00000000-0000-0000-585F-914BFF610C9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4fhr.yr5t_ng5n"><intent_id>1269081</intent_id><project_id>968235</project_id><text_data>DM Disposal Inc. (a Waste Connections company) is self insured under Waste Connections. Quarterly Reports and remittances are made to L&amp;I through L&amp;I Account ID 706,214-00-4. The corresponding UBI# for Waste Connections is 601 826 978</text_data><comment_date>2022-09-23T00:00:00</comment_date></row><row _id="row-4ahp.xqiy.zebq" _uuid="00000000-0000-0000-4C13-2FDFC53F1C26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ahp.xqiy.zebq"><intent_id>521911</intent_id><project_id>691459</project_id><text_data>This was emergency service work - no bid was given - all time and material.</text_data><comment_date>2012-07-12T00:00:00</comment_date></row><row _id="row-2tzm_xhp8_y43v" _uuid="00000000-0000-0000-826D-99C534B06081" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tzm_xhp8_y43v"><intent_id>637509</intent_id><project_id>738023</project_id><text_data>Form filed by: Curtis Crites</text_data><comment_date>2014-06-26T00:00:00</comment_date></row><row _id="row-wnx5-6eka_h6jg" _uuid="00000000-0000-0000-93CA-D4C9333B015C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wnx5-6eka_h6jg"><intent_id>701977</intent_id><project_id>761140</project_id><text_data>other truck = lowboy to deliver equipment</text_data><comment_date>2015-06-19T00:00:00</comment_date></row><row _id="row-kdqn_c2u2.bn34" _uuid="00000000-0000-0000-48EC-8D2B6D86B504" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kdqn_c2u2.bn34"><intent_id>706525</intent_id><project_id>766141</project_id><text_data>This project involves installing an irrigation system on a softball field</text_data><comment_date>2015-07-10T00:00:00</comment_date></row><row _id="row-bhp4.nqvd_aaxv" _uuid="00000000-0000-0000-5E52-A4E4B7E12CB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bhp4.nqvd_aaxv"><intent_id>656160</intent_id><project_id>742261</project_id><text_data>Form filed by: Kenneth Rustia</text_data><comment_date>2014-09-23T00:00:00</comment_date></row><row _id="row-4d8x.thqi.su4i" _uuid="00000000-0000-0000-0FA4-E71365D02C5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4d8x.thqi.su4i"><intent_id>988544</intent_id><project_id>879340</project_id><text_data>#1-Electrical, #2- Other Residential Structure,#3-2 Floors, #4 A. No B.No C.No, D. NO, E.No, F. No, G. No, H.No., I. Yes, J. No, K.No., L.No.#5 Yes, #6 Yes., #7 Yes, #8 No.</text_data><comment_date>2019-06-28T00:00:00</comment_date></row><row _id="row-wgpz-arfy-d5cn" _uuid="00000000-0000-0000-F9FF-B6BFCD9696F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wgpz-arfy-d5cn"><intent_id>744549</intent_id><project_id>784093</project_id><text_data>A) Whole project consists of installing subsurface drainage on existing sports field, over approximately 90,000 sqft area.B) We are doing the whole project, which consists of trenching no more than 5� wide no deeper than 2�, removing spoils with a trailer, installing HDPE perforated pipe some 3� and some 2�, back filling trench with sand using custom equipment and tractor. Compacting trench sand with custom equipment and tractor. Use of hand tool will be limited to trenching shovels, sledge hammer, back pack blower, and muck rakes. There are no plans for irrigation installation or soil or mulch spreading.C) THIS PROCESS HAS BEEN APPROVED AS FALLING UNDER THE WA LANDSCAPING CODE. WE ARE IN OREGON, AND WE HAVE THE RECIPRICAL AGREEMENT WITH WASHINGTON FOR WORKERS COMP</text_data><comment_date>2016-02-02T00:00:00</comment_date></row><row _id="row-6sv6-hfqd.zuy2" _uuid="00000000-0000-0000-BC86-6AA3DAD9407F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6sv6-hfqd.zuy2"><intent_id>777931</intent_id><project_id>798129</project_id><text_data>Clean up of trash/debris; Tools used: gloves, garbage bags</text_data><comment_date>2016-07-27T00:00:00</comment_date></row><row _id="row-ydsu.qkgk.i952" _uuid="00000000-0000-0000-1778-5C56BAC543D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ydsu.qkgk.i952"><intent_id>1221999</intent_id><project_id>1006240</project_id><text_data>A) Please describe the whole project � not just your part.A) Construction of a naturally draining paved pump track in East Park for the City of Quincy, WA. Total area of disturbance is approximately 15,000 sq ft with 11,026 sq ft of asphalt paths to be used by bicycle and scooter user groups for recreation. The scope of work involves the complete construction of the pump track, including materials delivery, shaping of rollers and corners with machines and hand tools to compact soil into these landforms, placing sub-base material (gravel), addressing natural stormwater drainage on-site using swales along bare areas on the inside of the track to prevent pooling on the asphalt, complete asphalt paving of a 10ft wide path over compacted landforms, and assist the city with limited landscape plantings installation, if needed. All features, except drainage, are built at or above grade. Subgrade excavation is at a depth of 1.5ft to allow for natural drainage along the inside of the track. B) Please describe your part(s) of the project �the tasks you performed, equipment used, and tools used.B)For the construction process builders will transport, shape, and compact approximately 56,000 cubic ft of soil using tools and machines that include: a mini excavator, compact track loader, various sized plate compactors, walk-behind a remote-controlled trench roller, shovels, mcleods, and wheelbarrows. Drainage will be addressed by shaping the track in a way that it will drain naturally onsite along with subgrade excavation of 1.5ft along the inside of the track to prevent pooling on the asphalt. Approximately 4,678 cubic ft of gravel will be transported and compacted over the features (using the tools and machines listed above) as a base for the asphalt. Approximately 2,756 cubic ft of asphalt will then be paved over the gravel base with shovels, rakes, and plate compactors. Asphalt will be transported from delivery trucks to the pump track using a backhoe and wheelbarrows. All work to be completed by evergreen employees. No subcontractors will be used on the project.</text_data><comment_date>2022-04-21T00:00:00</comment_date></row><row _id="row-uxwd-wdbx-9dh7" _uuid="00000000-0000-0000-A8C8-605C5E92E341" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uxwd-wdbx-9dh7"><intent_id>704113</intent_id><project_id>765353</project_id><text_data>WORKERS COMP CARRIER- SAIF CORP POLICY # 947202.  WE DON&amp;#39;T HAVE ANY EMPLOYEES THAT ARE RESIDENTS OF WA.</text_data><comment_date>2015-06-29T00:00:00</comment_date></row><row _id="row-46ty-jjjp_njcm" _uuid="00000000-0000-0000-D624-D66883C015D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-46ty-jjjp_njcm"><intent_id>992174</intent_id><project_id>885218</project_id><text_data>INSTALL CCTV, INSTALL ACCESS CONTROL ALL INDOORS</text_data><comment_date>2019-07-16T00:00:00</comment_date></row><row _id="row-jwta_iina~qw34" _uuid="00000000-0000-0000-BDBD-59C97EF36C4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jwta_iina~qw34"><intent_id>694828</intent_id><project_id>762380</project_id><text_data>Blythe job # S-256</text_data><comment_date>2015-05-15T00:00:00</comment_date></row><row _id="row-rcpd-qxz6.rjvj" _uuid="00000000-0000-0000-D3F8-8F3EB8A36C86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rcpd-qxz6.rjvj"><intent_id>1179614</intent_id><project_id>980389</project_id><text_data>Tear down and return 12x56 mobile office building using 2007 International Toter</text_data><comment_date>2021-09-22T00:00:00</comment_date></row><row _id="row-jajc~n5i5.8e6n" _uuid="00000000-0000-0000-988D-DD77F71365D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jajc~n5i5.8e6n"><intent_id>645840</intent_id><project_id>740731</project_id><text_data>Truck Driver will be driving a 3000 gal truck mounted Hydroseeder</text_data><comment_date>2014-08-05T00:00:00</comment_date></row><row _id="row-3g2e~337f_9ff9" _uuid="00000000-0000-0000-B7F0-833FEB20C6F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3g2e~337f_9ff9"><intent_id>698226</intent_id><project_id>763851</project_id><text_data>LAN(Local Area Network)Outside Work- Fusion splice fiber optic cablingElect Tech (06)</text_data><comment_date>2015-06-03T00:00:00</comment_date></row><row _id="row-tsi2.s76u-3eyp" _uuid="00000000-0000-0000-33D4-AB505AA5AAA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsi2.s76u-3eyp"><intent_id>1154051</intent_id><project_id>960658</project_id><text_data>Placing topsoil, compost, mulch and planting. Most of the work will be performed with hand tools. Any heavy machinery will be performed by owner/operator</text_data><comment_date>2021-06-21T00:00:00</comment_date></row><row _id="row-c6z8_fwqr.tc5j" _uuid="00000000-0000-0000-A2DB-4E047F08C493" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6z8_fwqr.tc5j"><intent_id>537958</intent_id><project_id>697168</project_id><text_data>Landscape work performed under �clean up of the area� consists of re-edging surrounding lawn and planter bed borders, refreshing bark mulch, pruning plants damaged from the work and general neatening / trash pick-up within the landscape.Any clean-up from work performed under banner of stump removal was within that scope.</text_data><comment_date>2013-01-08T00:00:00</comment_date></row><row _id="row-gkax.ikpf-kfxr" _uuid="00000000-0000-0000-A547-5D47412E2F52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gkax.ikpf-kfxr"><intent_id>1117097</intent_id><project_id>947619</project_id><text_data>7024117</text_data><comment_date>2021-01-22T00:00:00</comment_date></row><row _id="row-mzvd~84b9~3zzw" _uuid="00000000-0000-0000-D2C3-8BBFC2D6E6A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mzvd~84b9~3zzw"><intent_id>897929</intent_id><project_id>844709</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2018-04-11T00:00:00</comment_date></row><row _id="row-gjc3_rebq~mz5v" _uuid="00000000-0000-0000-7ECA-53746AA0DEC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gjc3_rebq~mz5v"><intent_id>1023955</intent_id><project_id>885540</project_id><text_data>Chevy 1500 used to transport employees and small stools to and from job site and shop.</text_data><comment_date>2019-12-19T00:00:00</comment_date></row><row _id="row-wzzw.54sk_fgqv" _uuid="00000000-0000-0000-8D72-7C453F549CD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wzzw.54sk_fgqv"><intent_id>1001023</intent_id><project_id>890816</project_id><comment_date>2019-08-20T00:00:00</comment_date></row><row _id="row-p9cw-rdeg~ergh" _uuid="00000000-0000-0000-B9C1-9A003B31F933" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p9cw-rdeg~ergh"><intent_id>544661</intent_id><project_id>698877</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) will perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-02-08T00:00:00</comment_date></row><row _id="row-9ztr~pi8e-3mi6" _uuid="00000000-0000-0000-9664-0E019509E09B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ztr~pi8e-3mi6"><intent_id>1317282</intent_id><project_id>1061943</project_id><text_data>1 - Provide &amp; install flooring in housing unit2 - Yes - Apt3 - 1 story4 - HousingA) NoB) NoC) YesD) NoE) NoF) NoG) NoH) NoI) NoJ) NoK) No5 - Yes6 - Yes7 - No8 - No</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-vipt_dx6h.2piq" _uuid="00000000-0000-0000-B968-3AEBBF5A540E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vipt_dx6h.2piq"><intent_id>1317632</intent_id><project_id>1040660</project_id><text_data>sweeping using a truck mounted sweeper.</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-2cc6-f6fe_c5e4" _uuid="00000000-0000-0000-5937-C932BB1F031B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2cc6-f6fe_c5e4"><intent_id>1318844</intent_id><project_id>1062878</project_id><text_data>303931</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-hrae-zau2.j7a9" _uuid="00000000-0000-0000-EE3B-881CACB6487F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hrae-zau2.j7a9"><intent_id>683123</intent_id><project_id>734899</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2015-03-12T00:00:00</comment_date></row><row _id="row-dzs7~39gg.8nqn" _uuid="00000000-0000-0000-7DDD-D041AC31423E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dzs7~39gg.8nqn"><intent_id>927379</intent_id><project_id>859203</project_id><text_data>Job 202279</text_data><comment_date>2018-08-21T00:00:00</comment_date></row><row _id="row-r9bi-e7w6~puf3" _uuid="00000000-0000-0000-3846-F1D0723FDA9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9bi-e7w6~puf3"><intent_id>578200</intent_id><project_id>712878</project_id><text_data>I the owner performened the work on this job and I pay myself above the wage required.</text_data><comment_date>2013-06-27T00:00:00</comment_date></row><row _id="row-4bp7-vvvn.y763" _uuid="00000000-0000-0000-F52C-52DD29709168" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4bp7-vvvn.y763"><intent_id>629366</intent_id><project_id>734857</project_id><text_data>Install french drainage in existing field, depth to 14&amp;quot;, trencher 25 hp, hand shoveling, hand raking, small articulated loader 25 hp, touch up seeding using hand rakes, minor irrigation repair (no equipment).</text_data><comment_date>2014-05-13T00:00:00</comment_date></row><row _id="row-m95z_3pnv~vsg7" _uuid="00000000-0000-0000-D121-9AE7E74B7F34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m95z_3pnv~vsg7"><intent_id>681492</intent_id><project_id>756686</project_id><text_data>Installation of A/V System within Vaughn Elementary Gymnasium.</text_data><comment_date>2015-03-02T00:00:00</comment_date></row><row _id="row-aifm~t7ju.ssuf" _uuid="00000000-0000-0000-5617-CD0BA04D4D2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aifm~t7ju.ssuf"><intent_id>957184</intent_id><project_id>870103</project_id><text_data>Manuel Garcia1809 S 18th ST.Union Gap, WA 98903</text_data><comment_date>2019-01-27T00:00:00</comment_date></row><row _id="row-gqcp~k8mx.6emr" _uuid="00000000-0000-0000-F155-4C4A362F3F2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqcp~k8mx.6emr"><intent_id>608454</intent_id><project_id>712753</project_id><text_data>This intent is for 90192 BP#202</text_data><comment_date>2014-01-16T00:00:00</comment_date></row><row _id="row-dpyg~rega.udqn" _uuid="00000000-0000-0000-C728-1526F4F2B91C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpyg~rega.udqn"><intent_id>765447</intent_id><project_id>792535</project_id><text_data>Sprinkler system for middle school replacement building, depth of less than 3 feet.Landscaping:  beauty bark, plants, sod or seed for new buildingNo swales, no stream restoration control, no erosion control, no parking lots, no highway beautification.</text_data><comment_date>2016-06-01T00:00:00</comment_date></row><row _id="row-tgrr.ewij_ujta" _uuid="00000000-0000-0000-1449-38379101BE2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tgrr.ewij_ujta"><intent_id>1092320</intent_id><project_id>923578</project_id><text_data>Other Truck - Equipment Haul using a Kenworth 6x4 Bogie Axle 56,000 GVW Diesel</text_data><comment_date>2020-09-30T00:00:00</comment_date></row><row _id="row-jx4q~pegv-bi2v" _uuid="00000000-0000-0000-DEC8-802AE2146334" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jx4q~pegv-bi2v"><intent_id>844103</intent_id><project_id>814401</project_id><text_data>Install Cat6 Cabling for Data Network and IP Phone</text_data><comment_date>2017-06-28T00:00:00</comment_date></row><row _id="row-7qqy~vuec-ts3s" _uuid="00000000-0000-0000-4F34-75B31FE881DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7qqy~vuec-ts3s"><intent_id>858701</intent_id><project_id>831033</project_id><text_data>We will clearing off existing plants with a mini excavator under 90 hp and some hand tools.  We will be hauling out with small single axle trucks and one dump truck.  The vegetation will be replaced with basalt rock mulch only. No irrigation and no planting.  There was a water truck used one day when the clearing got dusty.</text_data><comment_date>2017-08-25T00:00:00</comment_date></row><row _id="row-i3ve.rfq7.2x3k" _uuid="00000000-0000-0000-9162-2AA489E49DF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i3ve.rfq7.2x3k"><intent_id>1237450</intent_id><project_id>970181</project_id><text_data>This project work provides all labor, equipment, tools, material, supplies and incidentals necessary for the installation of an engineered structural metal frame building on a new structural concrete slab foundation including preparing the site for new building to include grading, erosion control, concrete foundation, slab, coating of slab, stem walls, and new storm drain system. Work will also include the decommissioning, removal, and disposal of the existing vault toilet located at the project site.Our laborer's will use battery screw guns, ladders, battery drill.</text_data><comment_date>2022-06-23T00:00:00</comment_date></row><row _id="row-96jj_jqc4-bwa3" _uuid="00000000-0000-0000-4625-C06175DBEFF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96jj_jqc4-bwa3"><intent_id>846875</intent_id><project_id>824394</project_id><text_data>Lakeside job# 0417142TRUCKSlowboy delivers asphalt rotomill to jobsitesweeper driven to jobsite</text_data><comment_date>2017-07-12T00:00:00</comment_date></row><row _id="row-q2a7-cfwx-kvzk" _uuid="00000000-0000-0000-1D96-04B7F4BBF829" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q2a7-cfwx-kvzk"><intent_id>1144051</intent_id><project_id>962043</project_id><text_data>Tom Gibelyou, President &amp; Owner, will be the one performing all work associated with this project.</text_data><comment_date>2021-05-12T00:00:00</comment_date></row><row _id="row-7i48~kznq_8nit" _uuid="00000000-0000-0000-CABF-B1D253C71AA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7i48~kznq_8nit"><intent_id>1043670</intent_id><project_id>876867</project_id><text_data>WO9129566</text_data><comment_date>2020-03-06T00:00:00</comment_date></row><row _id="row-6ask~a696.ehgy" _uuid="00000000-0000-0000-4080-4B71CC54CB7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ask~a696.ehgy"><intent_id>814860</intent_id><project_id>805182</project_id><text_data>Welding of security bars will be done off site.</text_data><comment_date>2017-02-20T00:00:00</comment_date></row><row _id="row-psyb-9kz6.w3d4" _uuid="00000000-0000-0000-40C2-3C935B89D21E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-psyb-9kz6.w3d4"><intent_id>862703</intent_id><project_id>832584</project_id><text_data>OTher trucks: Water &amp; Lowboy</text_data><comment_date>2017-09-14T00:00:00</comment_date></row><row _id="row-nr9y_ibad_pcj4" _uuid="00000000-0000-0000-92B2-15604D68758C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nr9y_ibad_pcj4"><intent_id>1042897</intent_id><project_id>859547</project_id><text_data>Intent for Boze ES Playground area.</text_data><comment_date>2020-03-04T00:00:00</comment_date></row><row _id="row-jtx5.8b43.bjb2" _uuid="00000000-0000-0000-A781-5F1C2766B5EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jtx5.8b43.bjb2"><intent_id>687565</intent_id><project_id>759303</project_id><text_data>We are installing a new ductless mini split heap pump into a single family residence.  It is not used for business in any way. It is a permanent residence only.</text_data><comment_date>2015-04-06T00:00:00</comment_date></row><row _id="row-u36z~nx5t~tpg9" _uuid="00000000-0000-0000-2732-65E11BCC47FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u36z~nx5t~tpg9"><intent_id>1015788</intent_id><project_id>878466</project_id><text_data>Skanska Agreement #138747-OS; Access Road</text_data><comment_date>2019-10-22T00:00:00</comment_date></row><row _id="row-nukr_jwur.fcs3" _uuid="00000000-0000-0000-D3B4-65C31868F97D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nukr_jwur.fcs3"><intent_id>1003008</intent_id><project_id>891566</project_id><text_data>87602 Franklin County Corrections Left Oven</text_data><comment_date>2019-08-27T00:00:00</comment_date></row><row _id="row-g7pg-2q3q-7amh" _uuid="00000000-0000-0000-9771-73BADE9EFE71" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g7pg-2q3q-7amh"><intent_id>1077246</intent_id><project_id>927727</project_id><comment_date>2020-08-03T00:00:00</comment_date></row><row _id="row-qate-ss89.nq7e" _uuid="00000000-0000-0000-1F7A-6E5C35F0B50C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qate-ss89.nq7e"><intent_id>763278</intent_id><project_id>649039</project_id><text_data>Filed by Carrie Dallas1. What is the specific purpose of this awarding agency&amp;#39;s public works project? Construction of an alternative traffic route for the Alaskan Way Viaduct 2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No.3. Does this project entail the remodeling or new construction of a facility? No4. If your firm is working upon a type of building system, what type of system is involved? N/A5. What specific tasks did your employees perform? Engineering evaluation for soil bearing capacities and settlement calculations6. What, if any, tools did your employees use in the performance of those tasks? Computer for engineering analysis7. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No 8. Are you going to be hiring any subcontractors for this project? Yes.</text_data><comment_date>2016-05-19T00:00:00</comment_date></row><row _id="row-yaqf.k9vs-gyz3" _uuid="00000000-0000-0000-A591-ECFFABB50FC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yaqf.k9vs-gyz3"><intent_id>979173</intent_id><project_id>873488</project_id><text_data>I have a Workers Compensation Policy Through Idahos State Insurance Fund.Policy #654594</text_data><comment_date>2019-05-20T00:00:00</comment_date></row><row _id="row-m84u.z87w-rd3m" _uuid="00000000-0000-0000-5D1D-AD60D8D043A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m84u.z87w-rd3m"><intent_id>480050</intent_id><project_id>558500</project_id><text_data>I did not hire any journeyman for this project, only one 65% apprentice through the IBEW union hall.</text_data><comment_date>2011-10-14T00:00:00</comment_date></row><row _id="row-jpf9~nsq2-nkz7" _uuid="00000000-0000-0000-F792-D30BE2C20441" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jpf9~nsq2-nkz7"><intent_id>692621</intent_id><project_id>761423</project_id><text_data>INSULATIONSINGLE FAMILYSINGLE STORYNONOYESNONONONONONONONOYESYESNONO</text_data><comment_date>2015-05-05T00:00:00</comment_date></row><row _id="row-kv2i~i76y_zs9z" _uuid="00000000-0000-0000-DE27-B64F0CE90857" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kv2i~i76y_zs9z"><intent_id>951651</intent_id><project_id>861476</project_id><text_data>Job 941361</text_data><comment_date>2018-12-19T00:00:00</comment_date></row><row _id="row-inzk.tzbf.4m6m" _uuid="00000000-0000-0000-14BA-B23539883B44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inzk.tzbf.4m6m"><intent_id>841756</intent_id><project_id>824859</project_id><text_data>Material arrives to Waite specialty via our truck. finished parts ship to Dam via private carrier (Oak harbor freight)</text_data><comment_date>2017-06-20T00:00:00</comment_date></row><row _id="row-82cf-wpz3~a66r" _uuid="00000000-0000-0000-E051-E9E01B2A4552" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-82cf-wpz3~a66r"><intent_id>751093</intent_id><project_id>780482</project_id><text_data>PPC 15555</text_data><comment_date>2016-03-11T00:00:00</comment_date></row><row _id="row-h87g~sg5t_wnc8" _uuid="00000000-0000-0000-F3DF-C473480C4111" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h87g~sg5t_wnc8"><intent_id>701197</intent_id><project_id>765063</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-06-16T00:00:00</comment_date></row><row _id="row-s8qk~97ce~mghr" _uuid="00000000-0000-0000-DF65-5B13180F815B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s8qk~97ce~mghr"><intent_id>1086912</intent_id><project_id>932089</project_id><comment_date>2020-09-10T00:00:00</comment_date></row><row _id="row-thud-xbey~vbcw" _uuid="00000000-0000-0000-303B-21BB23ED0AEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thud-xbey~vbcw"><intent_id>869750</intent_id><project_id>822996</project_id><text_data>We pay fringe in cash &amp; deduct for medical &amp; vacation, each employees fringe will be different.</text_data><comment_date>2017-10-18T00:00:00</comment_date></row><row _id="row-67gh_vdmp~stvv" _uuid="00000000-0000-0000-D476-0879AD1FEBC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-67gh_vdmp~stvv"><intent_id>557202</intent_id><project_id>700575</project_id><text_data>Installation will be done by using shovels and picks to dig down to a  trench 12&amp;quot; in depth and installing an irrigation system</text_data><comment_date>2013-02-26T00:00:00</comment_date></row><row _id="row-dbhy~sqn6_4pcn" _uuid="00000000-0000-0000-B4C7-DCBAB2C7AC8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dbhy~sqn6_4pcn"><intent_id>1469151</intent_id><project_id>1146350</project_id><text_data>JOB 51427-1</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-shap~bnzg~45rb" _uuid="00000000-0000-0000-8AD4-E563A1189F46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-shap~bnzg~45rb"><intent_id>1457093</intent_id><project_id>1140148</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2024-10-04T00:00:00</comment_date></row><row _id="row-fb87.3xk4-2xf6" _uuid="00000000-0000-0000-7A60-988F6A1ABB96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fb87.3xk4-2xf6"><intent_id>837158</intent_id><project_id>823004</project_id><text_data>Filed by Joanna BadgleyLandscape maintenance - Project is exempt from state prevailing wage requirements based on the housing act of 1937 and 24 CFR 965.101. Works will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trade/occupations: Landscape maintenance using hand tools and lawn mowers</text_data><comment_date>2017-05-31T00:00:00</comment_date></row><row _id="row-qy36.b69j-b3ef" _uuid="00000000-0000-0000-9746-C55685FBDFAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qy36.b69j-b3ef"><intent_id>1176932</intent_id><project_id>978975</project_id><text_data>#1-We were contracted to REPLACE FURNACE. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2021-09-13T00:00:00</comment_date></row><row _id="row-3bu8-srv7-9qw3" _uuid="00000000-0000-0000-2E42-B694B6086931" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bu8-srv7-9qw3"><intent_id>923319</intent_id><project_id>855142</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborers Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2018-08-06T00:00:00</comment_date></row><row _id="row-fanf~nu2b_erv9" _uuid="00000000-0000-0000-8BA4-457FD4F03469" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fanf~nu2b_erv9"><intent_id>1209520</intent_id><project_id>998336</project_id><text_data>22-F001</text_data><comment_date>2022-02-06T00:00:00</comment_date></row><row _id="row-76pm_jjq9-baa5" _uuid="00000000-0000-0000-B0A6-B831527A4D24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-76pm_jjq9-baa5"><intent_id>684441</intent_id><project_id>755825</project_id><text_data>Form filed by:  Lani Cagampang Huber</text_data><comment_date>2015-03-18T00:00:00</comment_date></row><row _id="row-ihph-kpvi.nb7z" _uuid="00000000-0000-0000-34B7-FD3CB02680F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihph-kpvi.nb7z"><intent_id>1168659</intent_id><project_id>974858</project_id><text_data>Work is done outside, Telecom tech will be running fiber optic cable (for internet)</text_data><comment_date>2021-08-19T00:00:00</comment_date></row><row _id="row-sgbd-m5iz.z8c5" _uuid="00000000-0000-0000-9D05-802AD4E332DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sgbd-m5iz.z8c5"><intent_id>916568</intent_id><project_id>855379</project_id><text_data>From: Hilary Hayden &amp;lt;hilaryh@chberesford.com&amp;gt; Sent: Monday, October 29, 2018 2:11 PMTo: LNI RE Prevailing Wage Worker 1 &amp;lt;PW1@LNI.WA.GOV&amp;gt;Subject: Intent 916568/ Affidavit 806119. Hello,Could you please add a note to add a note to intent 916568 and affidavit 806119 including Northshore�s PO #: P184005? Please let me know if you need any additional information. Thank you,Hilary HaydenThe Beresford Company</text_data><comment_date>2018-10-30T00:00:00</comment_date></row><row _id="row-a7id-ittd.6e92" _uuid="00000000-0000-0000-D3FA-0050CF521114" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7id-ittd.6e92"><intent_id>1218712</intent_id><project_id>1004203</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement:?On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12).L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form.On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-04-11T00:00:00</comment_date></row><row _id="row-g5xy-pq9y~nfra" _uuid="00000000-0000-0000-4C06-1D624BA2D39A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g5xy-pq9y~nfra"><intent_id>1043847</intent_id><project_id>911515</project_id><text_data>353131</text_data><comment_date>2020-03-09T00:00:00</comment_date></row><row _id="row-8yrp.y5ba.fkab" _uuid="00000000-0000-0000-1A0C-3C4FF86B1A72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yrp.y5ba.fkab"><intent_id>827492</intent_id><project_id>818478</project_id><text_data>Annual and semi annual maintenance of generators completed 4/14/2017  2 year contract</text_data><comment_date>2017-04-18T00:00:00</comment_date></row><row _id="row-gxpx-4eyz_ivsv" _uuid="00000000-0000-0000-98F4-858DF68CFB91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gxpx-4eyz_ivsv"><intent_id>1209609</intent_id><project_id>997276</project_id><text_data>Access control and burglar alarm installation for buildings A, B, C, Water Tower and Aux buildings</text_data><comment_date>2022-02-07T00:00:00</comment_date></row><row _id="row-xd65.xuki-cz8j" _uuid="00000000-0000-0000-499C-1F89F39838B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xd65.xuki-cz8j"><intent_id>817628</intent_id><project_id>812284</project_id><text_data>MMFS Job #73166304</text_data><comment_date>2017-02-24T00:00:00</comment_date></row><row _id="row-p3r7.rbc8_qui8" _uuid="00000000-0000-0000-35F7-F7DE1DCB0E1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p3r7.rbc8_qui8"><intent_id>1211078</intent_id><project_id>990366</project_id><text_data>Lakeside job# 1221029TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite*** REPLACES INTENT # 1192693 ****** Awarding agency has asked L&amp;I to resolve their 2 separate user accounts on the PWIA system, no action taken yet ****** Awarding agency only has access to 1 of the 2 existing user accounts, which has caused this current issue of both the prime and us as a sub filing an intent, CPs, and affidavit on the old user account which awarding agency cannot access ****** Please assist so this does not happen again ***</text_data><comment_date>2022-02-11T00:00:00</comment_date></row><row _id="row-veps.mxgm_8xdf" _uuid="00000000-0000-0000-5694-DBAC7C574771" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-veps.mxgm_8xdf"><intent_id>746924</intent_id><project_id>785168</project_id><text_data>302172</text_data><comment_date>2016-02-16T00:00:00</comment_date></row><row _id="row-jb9g_cfz5_ub5e" _uuid="00000000-0000-0000-575A-8924DE6FF181" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jb9g_cfz5_ub5e"><intent_id>997597</intent_id><project_id>889440</project_id><text_data>This project is a donation. The contract amount reflects the value of the donation.</text_data><comment_date>2019-08-06T00:00:00</comment_date></row><row _id="row-njqw~hhft~mt64" _uuid="00000000-0000-0000-8189-E1A01CF1DDC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-njqw~hhft~mt64"><intent_id>1272771</intent_id><project_id>1034354</project_id><text_data>Everett - Repair 1011522 - 6000574627</text_data><comment_date>2022-10-07T00:00:00</comment_date></row><row _id="row-ggat~zax3.kudv" _uuid="00000000-0000-0000-3769-52C5C431D2CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ggat~zax3.kudv"><intent_id>1209233</intent_id><project_id>998141</project_id><text_data>CROSS-CONNECT PHONE LINE</text_data><comment_date>2022-02-03T00:00:00</comment_date></row><row _id="row-mbxj~an68-2kgx" _uuid="00000000-0000-0000-78EE-B637D8482098" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbxj~an68-2kgx"><intent_id>1014919</intent_id><project_id>884234</project_id><text_data>Overview of project as a whole: bring playground material in a truck to the facility where everything was marked and ready to take a hose and blow the product on the playground where they told us. No other tools, etc. are used. Truck = KENWORTH T-800 4 axle Trailer = IMCO live floor trailer 48� this truck was used to deliver Engineered Wood Fiber (a type of Playground Chip). Material was delivered using our blower trailer to blow material into designated areas specified by the Prime Contractor. Our portion of the project: employee took a hose and blew the product on the playground where they told us. No other tools, etc. are used.</text_data><comment_date>2019-11-08T00:00:00</comment_date></row><row _id="row-76sg-tmx7.gaz9" _uuid="00000000-0000-0000-CBE3-94DBE9E4DEC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-76sg-tmx7.gaz9"><intent_id>483566</intent_id><project_id>437638</project_id><text_data>Our work is installing a landscape irrigation system</text_data><comment_date>2011-10-13T00:00:00</comment_date></row><row _id="row-vhga~jdkv.h9iv" _uuid="00000000-0000-0000-B992-5B9A4F774956" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vhga~jdkv.h9iv"><intent_id>825877</intent_id><project_id>804125</project_id><text_data>This Intent is to replace previous filed Intent number 795670, which was filed under wrong Contractor Registration Number</text_data><comment_date>2017-04-11T00:00:00</comment_date></row><row _id="row-dp39-wbv3_auxx" _uuid="00000000-0000-0000-167B-255D30949837" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dp39-wbv3_auxx"><intent_id>900067</intent_id><project_id>826002</project_id><text_data>1180006 - Central Kitsap HS &amp; MS</text_data><comment_date>2018-04-23T00:00:00</comment_date></row><row _id="row-3tuc.7cds-wwv9" _uuid="00000000-0000-0000-6F29-595C7EE1760F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3tuc.7cds-wwv9"><intent_id>862994</intent_id><project_id>832698</project_id><text_data>Filed by Linda Burdick</text_data><comment_date>2017-09-15T00:00:00</comment_date></row><row _id="row-nbsj~yau8_qq6q" _uuid="00000000-0000-0000-0E77-DCA04B02DC33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nbsj~yau8_qq6q"><intent_id>532232</intent_id><project_id>695165</project_id><text_data>5931 Eccles  1320 N Oak Harbor St #167, Oak Harbor</text_data><comment_date>2012-09-04T00:00:00</comment_date></row><row _id="row-ur79~6gxv~4jkt" _uuid="00000000-0000-0000-064A-6BFB8D3C4856" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ur79~6gxv~4jkt"><intent_id>537616</intent_id><project_id>697056</project_id><text_data>General Laborer- picking up after operators and shoveling dirtOther trucks - 2000&amp;4000 gallons water truck and Kenworth tractor with lowboy trailer</text_data><comment_date>2012-10-02T00:00:00</comment_date></row><row _id="row-cs7d_ctra~br7z" _uuid="00000000-0000-0000-C11B-EE64DED97089" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cs7d_ctra~br7z"><intent_id>858424</intent_id><project_id>825402</project_id><text_data>Wage$33.20Fringe$9.17 Health &amp; Welfare$6.20 Pension$0.37 Education$0.10 Training$0.25 Industry Promotion $5.38 Supplemental PensionTotal $21.62</text_data><comment_date>2017-09-15T00:00:00</comment_date></row><row _id="row-bmfn~gtd3_a4ak" _uuid="00000000-0000-0000-D4CA-24AE8B497CD0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmfn~gtd3_a4ak"><intent_id>828660</intent_id><project_id>818219</project_id><text_data>General laborer consists of hand work only (no power tools or equipment) $29.18 base + $7.29 pensionMotor patrol graders consists of Paver Operator,Blade Operator and Shuttle Buggy Operator $46.92 base + $11.74 pensionOther truck is a 0 to 8,000 gallon water truck used to help with compaction and dust control $32.46 base + $8.12 pension</text_data><comment_date>2017-04-25T00:00:00</comment_date></row><row _id="row-7vny-a37n.bmin" _uuid="00000000-0000-0000-A75A-EB012A10F237" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7vny-a37n.bmin"><intent_id>577298</intent_id><project_id>713287</project_id><text_data>I AM A OWNER OPERATOR I HAVE A DUMP TRUCK I HAVE NO INPLOYES</text_data><comment_date>2013-06-24T00:00:00</comment_date></row><row _id="row-tuv3~x5j7.i83s" _uuid="00000000-0000-0000-C067-CEBD06E7D391" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tuv3~x5j7.i83s"><intent_id>1113691</intent_id><project_id>945519</project_id><text_data>GARLAND 25-WA-201005GCI 20-1032</text_data><comment_date>2021-01-07T00:00:00</comment_date></row><row _id="row-b6er-nnx9_adtv" _uuid="00000000-0000-0000-0F9F-ACB1A660A4E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b6er-nnx9_adtv"><intent_id>772013</intent_id><project_id>795894</project_id><text_data>Cascade Hall and Kateri House are single family homes, the homes has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height. The home is not open to the public and does not have a business. The electrician/plumber will be installing new heat pump water heaters. This job meets the residential job requirements.</text_data><comment_date>2016-06-30T00:00:00</comment_date></row><row _id="row-87zy.3wak_4ubk" _uuid="00000000-0000-0000-85C7-8F61B54A1010" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87zy.3wak_4ubk"><intent_id>680342</intent_id><project_id>675364</project_id><text_data>FRINGE RATE AS OF 4-17-12ANNUITY:         4.00PENSION:         8.95H &amp; W:           6.52IMPACT:           .28APPR:             .63INDUSTRY:         .01TOTAL FRINGE:   20.39</text_data><comment_date>2015-02-23T00:00:00</comment_date></row><row _id="row-amng.dcaf-p6jh" _uuid="00000000-0000-0000-258E-AD843E6B8273" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-amng.dcaf-p6jh"><intent_id>1012684</intent_id><project_id>895312</project_id><text_data>'TRUCK DRIVER OTHER' USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK</text_data><comment_date>2019-10-07T00:00:00</comment_date></row><row _id="row-56ac_jre4~qzht" _uuid="00000000-0000-0000-1D2B-1D3878C51241" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-56ac_jre4~qzht"><intent_id>634771</intent_id><project_id>736976</project_id><text_data>Sports field drainage installation project; Slit-drainage is to drain standing water, ie: rain, irrigation. A trench that is consistently less than 2 feet is cut/dug and drain pipe is installed, then the trench is filled.</text_data><comment_date>2014-06-12T00:00:00</comment_date></row><row _id="row-ehie-dub3.56by" _uuid="00000000-0000-0000-5DB5-CB88525DFEE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ehie-dub3.56by"><intent_id>1076361</intent_id><project_id>922636</project_id><text_data>Other Trucks are lowboys to haul equipment Talked with Liz at L&amp;I - we are a self-insured company and are in good standings</text_data><comment_date>2020-07-30T00:00:00</comment_date></row><row _id="row-v86p-gwu4-vur2" _uuid="00000000-0000-0000-04BD-5FC87F64AA70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v86p-gwu4-vur2"><intent_id>1317514</intent_id><project_id>878466</project_id><text_data>trucks - lowboy delivers asphalt rotomill to jobsite</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-59uz~ej6y.4a8f" _uuid="00000000-0000-0000-F223-C6D83DEE36BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-59uz~ej6y.4a8f"><intent_id>578143</intent_id><project_id>711465</project_id><text_data>Breakdown of $14.55 Fringe:  7.14 Health/Welfare; 4.35 NW Pension; 1.61 IU Pension; .85 Promo; .54 Appr; .06 BAC/PAC &amp; Rebound</text_data><comment_date>2013-07-02T00:00:00</comment_date></row><row _id="row-8ec4~ia55_gfyr" _uuid="00000000-0000-0000-6DFF-3BEBA8528F99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ec4~ia55_gfyr"><intent_id>716954</intent_id><project_id>770879</project_id><text_data>Searched for clean outs according to the blueprints. 2 three inch wall clean outs on the prints were not found. 1 four inch floor clean-out was filled with concrete to grade. Located accessible floor clean-out in the middle unit. Camera inspected line from that access. Discovered an offset in the pipe approximately where the concreted clean-out ties in.pipe is approximately 5 feet deep under concrete floor. Discovered a second offset where the outside clean-out ties in at approximately 6 feet deep. Recommend repair of both offsets and installation of clean outs per drawings.</text_data><comment_date>2015-08-26T00:00:00</comment_date></row><row _id="row-9qb6-q5yx-mkvd" _uuid="00000000-0000-0000-448A-E6A960D3861A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9qb6-q5yx-mkvd"><intent_id>1038988</intent_id><project_id>903272</project_id><text_data>'TRUCK DRIVER - OTHER' USED FOR TRUCK MOUNTED PICK UP SWEEPER</text_data><comment_date>2020-02-17T00:00:00</comment_date></row><row _id="row-46d3-zbvs~qxu5" _uuid="00000000-0000-0000-5093-1B072CAF7CBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-46d3-zbvs~qxu5"><intent_id>989135</intent_id><project_id>886160</project_id><text_data>T105407/sv37631</text_data><comment_date>2019-07-02T00:00:00</comment_date></row><row _id="row-fjfc.dv9n-sy6e" _uuid="00000000-0000-0000-DE45-148ABCDCC5A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fjfc.dv9n-sy6e"><intent_id>1007716</intent_id><project_id>893441</project_id><comment_date>2019-09-17T00:00:00</comment_date></row><row _id="row-m2vq_7ryp_8qxm" _uuid="00000000-0000-0000-9180-44525B51987D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2vq_7ryp_8qxm"><intent_id>893959</intent_id><project_id>846338</project_id><text_data>Remove hazmat from abandoned vessel on shorelineCaptain to maneuver boat to abandoned vesselDeckhand to follow Captains directions in booming abandoned vessel</text_data><comment_date>2018-03-21T00:00:00</comment_date></row><row _id="row-6irs.thec-57us" _uuid="00000000-0000-0000-FB71-AE28C42F973D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6irs.thec-57us"><intent_id>1054675</intent_id><project_id>917390</project_id><text_data>Replacement of Bosch system with Sonitrol System</text_data><comment_date>2020-04-29T00:00:00</comment_date></row><row _id="row-tdj8_86ug~ef6k" _uuid="00000000-0000-0000-74CD-82858F05648A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tdj8_86ug~ef6k"><intent_id>1262214</intent_id><project_id>1024972</project_id><text_data>Truck Driver Other: Totor Style Truck that delivers mobile officesHoffman RO024469 PO6380021-44974-OL</text_data><comment_date>2022-08-29T00:00:00</comment_date></row><row _id="row-tbzq~kcjk.d3dp" _uuid="00000000-0000-0000-16B7-4F76CB2EFA14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tbzq~kcjk.d3dp"><intent_id>822633</intent_id><project_id>816453</project_id><text_data>Installing six speed bumps with hot mix material modified class B and seal the joint.Clean up labor will clean up the work area with broom and blower then set up the caution tape then clean up after the work done.</text_data><comment_date>2017-03-31T00:00:00</comment_date></row><row _id="row-8mer~3krf.s4zp" _uuid="00000000-0000-0000-1BF1-67D19EFFC46B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8mer~3krf.s4zp"><intent_id>594734</intent_id><project_id>719858</project_id><text_data>My name is Shad Dawes and i am the owner operator of First Class Flooring. I am a journeyman soft floor layer and will be directly supervising my apprentice as they will be the only employee that i will have on this project. Thank you</text_data><comment_date>2013-09-19T00:00:00</comment_date></row><row _id="row-reaq~3wp8-99yi" _uuid="00000000-0000-0000-F49F-94CC787CC799" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-reaq~3wp8-99yi"><intent_id>574969</intent_id><project_id>713158</project_id><text_data>Job # T10395</text_data><comment_date>2013-06-13T00:00:00</comment_date></row><row _id="row-s4m2-2n9w~n3dr" _uuid="00000000-0000-0000-FF24-E2E63A90F30E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4m2-2n9w~n3dr"><intent_id>1318800</intent_id><project_id>1062846</project_id><text_data>W1343953A - Intent</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-8bqk~u4m3-cpbk" _uuid="00000000-0000-0000-9B2F-CD29DBA0B8C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8bqk~u4m3-cpbk"><intent_id>488642</intent_id><project_id>676076</project_id><text_data>�	Please provide in detail the duties of the General Laborer(s) along with any tools, equipment, and vehicles in use by them for this project.The General Laborer(s) will arrive onsite and roll the generator from the trailer into place, they will bolt the generator to the floor. They will use a variety of hand tools.</text_data><comment_date>2011-12-01T00:00:00</comment_date></row><row _id="row-qpsi~jces.iu2a" _uuid="00000000-0000-0000-4777-2FB4917641C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qpsi~jces.iu2a"><intent_id>882796</intent_id><project_id>807037</project_id><text_data>I have noted the LNI account #641,055-00</text_data><comment_date>2018-01-18T00:00:00</comment_date></row><row _id="row-x55j_au55.j53d" _uuid="00000000-0000-0000-6ED8-55714EA617D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x55j_au55.j53d"><intent_id>683292</intent_id><project_id>757418</project_id><text_data>#1 - insulate attic. #2 - Duplex. #3 - Two. #4 - (a)NO(b)NO(c)Yes(d)No(e)No(f)No(g)No(h)No(i)No(j)No(k)N/A #- 5Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2015-03-12T00:00:00</comment_date></row><row _id="row-6net-v4cy.nfya" _uuid="00000000-0000-0000-5431-60AB9E459748" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6net-v4cy.nfya"><intent_id>504900</intent_id><project_id>673901</project_id><text_data>Our company will install the automatic irrigation system as specified; we will provide and install the landscape plantings, grass areas (both sod and hydroseed) in all specified areas;  we will also install weed control fabric, rock chips, and wood chips in all areas as specified.</text_data><comment_date>2012-03-22T00:00:00</comment_date></row><row _id="row-3qkg_3pgm~2kqu" _uuid="00000000-0000-0000-B5AF-F4F2032CF870" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3qkg_3pgm~2kqu"><intent_id>1248651</intent_id><project_id>990708</project_id><text_data>SPM #27062</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-vpxb~h9bc.gz4k" _uuid="00000000-0000-0000-8FB3-8E028B19B29A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vpxb~h9bc.gz4k"><intent_id>606233</intent_id><project_id>724139</project_id><text_data>043304</text_data><comment_date>2013-11-25T00:00:00</comment_date></row><row _id="row-r6k5_twxj~u8xc" _uuid="00000000-0000-0000-FC15-9431367E06CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r6k5_twxj~u8xc"><intent_id>682409</intent_id><project_id>757034</project_id><text_data>900 Plum ST SE Olympia WA 98501Remove old water heater replace with new AO smith water heater</text_data><comment_date>2015-03-06T00:00:00</comment_date></row><row _id="row-5bt8-sdtf~zd89" _uuid="00000000-0000-0000-4CFF-DBBB141E375B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bt8-sdtf~zd89"><intent_id>1231914</intent_id><project_id>1012192</project_id><text_data>Invoice 544860</text_data><comment_date>2022-05-09T00:00:00</comment_date></row><row _id="row-a7js.ifmi.f7qe" _uuid="00000000-0000-0000-44B1-5FC74F121724" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7js.ifmi.f7qe"><intent_id>717714</intent_id><project_id>766299</project_id><text_data>General Laborer consists of Hand work (no power tools or equipment) $28.33 base + $7.80 pensionBlade operator is used for grading the project site for compaction before paving or chip sealing operations $32.43 base + $8.11 pensionOther trucks consists of the following:1) 0 to 8,000 gallon water truck used to help with compaction during the grading process and dust control $33.06 base + $8.27 pension2) Oil distributor - used for oil distribution for chip sealing operations $33.06 base + $8.27 pension</text_data><comment_date>2015-08-31T00:00:00</comment_date></row><row _id="row-f78a-ws5a.84f7" _uuid="00000000-0000-0000-A3E4-F850936FD9A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f78a-ws5a.84f7"><intent_id>1092445</intent_id><project_id>934658</project_id><text_data>119695-001</text_data><comment_date>2020-09-30T00:00:00</comment_date></row><row _id="row-iap5_ae69-budx" _uuid="00000000-0000-0000-8724-7C2FACCACD6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iap5_ae69-budx"><intent_id>914412</intent_id><project_id>854559</project_id><text_data>Haynie Rd, Custer, WA 982401. Air seal, attic blow, duct seal, belly blow, mechanical ventilation		2. Single family		3. 1		4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No		5. Yes		6. Yes		7. No		8. No</text_data><comment_date>2018-06-27T00:00:00</comment_date></row><row _id="row-9b4g.kqqf-c9rh" _uuid="00000000-0000-0000-EE3A-BD9E88EEFF8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9b4g.kqqf-c9rh"><intent_id>542357</intent_id><project_id>698832</project_id><text_data>Job # C11108</text_data><comment_date>2012-10-31T00:00:00</comment_date></row><row _id="row-ffyk-3ir2.6hx6" _uuid="00000000-0000-0000-1928-826749DDAD0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ffyk-3ir2.6hx6"><intent_id>622284</intent_id><project_id>731873</project_id><text_data>Form filed by: Tamara Fischer�Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the above crafts/trades/occupations.�</text_data><comment_date>2014-03-27T00:00:00</comment_date></row><row _id="row-64m3_rqad-qu7b" _uuid="00000000-0000-0000-5B08-9F461ACDB7F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-64m3_rqad-qu7b"><intent_id>635820</intent_id><project_id>735396</project_id><text_data>Job # 3311 related to C11141</text_data><comment_date>2014-06-18T00:00:00</comment_date></row><row _id="row-hxvp-wkht~88ye" _uuid="00000000-0000-0000-9EBA-2051D00EEAB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxvp-wkht~88ye"><intent_id>563683</intent_id><project_id>697737</project_id><text_data>Form filed by: Sue Heidemann</text_data><comment_date>2013-04-09T00:00:00</comment_date></row><row _id="row-f7p4.qdfy.p6h8" _uuid="00000000-0000-0000-9231-A4E221651E21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f7p4.qdfy.p6h8"><intent_id>1169019</intent_id><project_id>932959</project_id><text_data>caliber hired us</text_data><comment_date>2021-08-13T00:00:00</comment_date></row><row _id="row-vp2c-j7j8~huc9" _uuid="00000000-0000-0000-0F81-6541B79E204F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vp2c-j7j8~huc9"><intent_id>911308</intent_id><project_id>853412</project_id><text_data>LABORERS ARE ASSIGNED THE FOLLOWING SCOPE OF WORK: To make patches and repairs as per proposal 19S026.  Special consideration to be given by Service Group to appropriately secure patches to concrete and attach to existing liner knowing existing Layfield patch was CSPE and will be patched with XR-5 to both CSPE and Coolguard 36 Geomembrane Linings.</text_data><comment_date>2018-06-14T00:00:00</comment_date></row><row _id="row-t9fr_gn4m.32bv" _uuid="00000000-0000-0000-845D-5B53CB0F9176" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9fr_gn4m.32bv"><intent_id>916582</intent_id><project_id>848227</project_id><text_data>Owner Operator, Im going to be doing all work on this project.</text_data><comment_date>2018-07-09T00:00:00</comment_date></row><row _id="row-7jg8~2tfb_9nta" _uuid="00000000-0000-0000-82BA-BBDD9C65C714" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7jg8~2tfb_9nta"><intent_id>745173</intent_id><project_id>784390</project_id><text_data>One subcontractor may or may not be used.</text_data><comment_date>2016-02-04T00:00:00</comment_date></row><row _id="row-8a2h~jze4.n8vh" _uuid="00000000-0000-0000-C79B-DFE904D0E4F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8a2h~jze4.n8vh"><intent_id>659962</intent_id><project_id>746013</project_id><text_data>Project requires material to be installed.  We subcontracted the work to be installed via blower truck.</text_data><comment_date>2014-10-16T00:00:00</comment_date></row><row _id="row-uu3t~ee7x_ppms" _uuid="00000000-0000-0000-5B30-0F32BE42CA60" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uu3t~ee7x_ppms"><intent_id>575070</intent_id><project_id>687903</project_id><text_data>Mag. #335079, Prevailing Wage Rate is $48.47</text_data><comment_date>2013-06-13T00:00:00</comment_date></row><row _id="row-a54j.s9qj-nzej" _uuid="00000000-0000-0000-8D26-138DBD6F9611" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a54j.s9qj-nzej"><intent_id>761449</intent_id><project_id>788791</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Wiring for ductless HVAC#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single family#3 - Including any basement or garage, how many stories or levels does the structure have? Single story log home#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? 				No(b) Any retail use in the structure? 					No(c) Permanent residence only? 						Yes(d) Rehabilitation house? 						No(e) Transitional housing? 						No(f) Communal dining facility? 						No(g) Treatment services? 						No(h) Dormitories? 							No(i) Counseling? 								No(j) Is each room and/or bed in the structure rented separately? 	No(k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? 		Yes#6 - Does each dwelling unit have its own bathroom? 				Yes#7 - Is there a community facility or manager�s office on site? 		No#8 - Is any part of the structure used by members of the public?		No</text_data><comment_date>2016-05-11T00:00:00</comment_date></row><row _id="row-zu7n-tsru~bmyy" _uuid="00000000-0000-0000-BA62-5CD9C2E9B6B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zu7n-tsru~bmyy"><intent_id>1130713</intent_id><project_id>945828</project_id><text_data>A) Please describe the whole project � not just your part. B) Please describe your part(s) of the project �the tasks you performed, equipment used, and tools used. Please provide as much detail as you can. If the project involves installing an irrigation system, trenching, installing French drains or other subsurface water collection systems, or spreading top soil or mulch, please tell us the relevant depths. 1) Hydroseeding the site with a hydroseeder machine and operator and a person manning the hose.  2) Installation of compost 403 cubic yards (bobcats to spread) Fine Compost 2-inch depth prior to hydroseeding. 3) May use a trencher for installation of silt fence around construction zone. 4) De-compact soil use a tractor-mounted rototiller for 1.5-acres in size.</text_data><comment_date>2021-03-23T00:00:00</comment_date></row><row _id="row-7cgc~kdq3~rhff" _uuid="00000000-0000-0000-FA66-19B6DA4984F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7cgc~kdq3~rhff"><intent_id>624952</intent_id><project_id>733015</project_id><text_data>Forgot to file before doing the work.</text_data><comment_date>2014-04-15T00:00:00</comment_date></row><row _id="row-z7sq-uj68_u987" _uuid="00000000-0000-0000-FA4A-4CCE164A04A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7sq-uj68_u987"><intent_id>738812</intent_id><project_id>764011</project_id><text_data>Filed by Karen Stephen</text_data><comment_date>2015-12-22T00:00:00</comment_date></row><row _id="row-g25j~swfc-fvj2" _uuid="00000000-0000-0000-477D-E0745578CF06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g25j~swfc-fvj2"><intent_id>516749</intent_id><project_id>668554</project_id><text_data>Filed by: Akhil JhaveriPOWER testing and energization inc will perform acceptance testing in accordance with the test procedures specified in sections 260526, 260573, 262413 and 262816, including addendums 1 thru 4, calling for NETA-ATS testing specifications by a 3rd party electrical testing company (ETC).This project is a replacement to the existing facility and POWER is engaged in acceptance testing.Our technicians will perform the following tests:1.  ground fault protections sytem, automatic transfer switch, metering - test and calibration2.  service ground, dry type transformer, substation switchgear, switchboard, moldere-case circuit breaker - testour employees will be using testing equipment along with laptop computers for analysis and reporting purposes.  equipment used: primary injection test set, omicron 156 relay tester, AC and DC Hi-pot tester.The engineering activities entail analysis of the test data and make recommendations for the customer for energization purposes.POWER Testing and Energization (POWER) is an independent third party testing company providing professional and technical services.  Our field engineering includes the performance of specialized services as specificed in section 260126 of project specification.POWER testing and energization does not alter, nor repair, nor install, nor demolish, nor operate equipment.  We perform tests which are in line with engineering activities.  We don't use any hand tools or operate any machinery.We are hired by electrical contractors that alter, repair, install, demolish, and operate equipment.  Since we are un-classified, we believe we are exempt from the requirements of Prevailing Wages.The work performed by POWER is not addressed under the applicable regulations of the Washington Administrative Code regarding prevailing wages.  Consequently, POWER is not obliged or able to issue a &amp;quot;Statement of Intent to Pay Prevailing Wages&amp;quot; form.Should you have any other questions, or require additional information, please call me on my cell phone: 360-601-7046.  Thank you,Akhil Jhaveri</text_data><comment_date>2012-06-13T00:00:00</comment_date></row><row _id="row-wwv7_94gx~hmt2" _uuid="00000000-0000-0000-2570-F8CBE7A5EF79" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wwv7_94gx~hmt2"><intent_id>776449</intent_id><project_id>797579</project_id><text_data>Telecom Tech(09)LAN(Local Area Network)Bits and BytesTelephoneInside work</text_data><comment_date>2016-07-21T00:00:00</comment_date></row><row _id="row-habp-2pst~dcjm" _uuid="00000000-0000-0000-582F-0252DFB63118" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-habp-2pst~dcjm"><intent_id>1165076</intent_id><project_id>973085</project_id><text_data>PO # 3194- LORI PARKER</text_data><comment_date>2021-07-30T00:00:00</comment_date></row><row _id="row-8pet_5nfr-79pt" _uuid="00000000-0000-0000-D344-2E06DB51A6FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8pet_5nfr-79pt"><intent_id>540081</intent_id><project_id>695780</project_id><text_data>NOTE: Intent and Affidavit forms submitted with a bid due date up until April 9, 2012, will be approved with the wage and fringe benefit amounts claimed by your firm if it meets or exceeds the required prevailing rate of wage. However, after that date your firm must calculate fringe benefits on the annualized figure of 2,080 and reflect those revised figures on your forms.</text_data><comment_date>2012-11-05T00:00:00</comment_date></row><row _id="row-a7zv-t6kc~m8jm" _uuid="00000000-0000-0000-F2CA-9FC083F97D12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7zv-t6kc~m8jm"><intent_id>924408</intent_id><project_id>858264</project_id><text_data>The project is to install a cured in place liner into existing storm sewer lines without digging them up - no excavation.  Michels to perform all work through existing manholes.</text_data><comment_date>2018-08-09T00:00:00</comment_date></row><row _id="row-vyng_bkh2.dsqk" _uuid="00000000-0000-0000-55BB-59B94CFA5A48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vyng_bkh2.dsqk"><intent_id>1160998</intent_id><project_id>971014</project_id><text_data>AV1SEATT-0006595 City of Tacoma Tacoma council chambers partial AV upgrade</text_data><comment_date>2021-07-16T00:00:00</comment_date></row><row _id="row-66ut.y3ch-jrv7" _uuid="00000000-0000-0000-5A4C-59821120E315" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-66ut.y3ch-jrv7"><intent_id>806837</intent_id><project_id>809209</project_id><text_data>1) Intermountain West Insulation was hired to provide weatherization in the form of insulation for this single family home. 2) Single family home. 3) Single story. 4) a)No B)No C)Yes D-K)No 5)Yes 6)Yes 7)No 8) No</text_data><comment_date>2016-12-13T00:00:00</comment_date></row><row _id="row-p26t.83tj_d2hj" _uuid="00000000-0000-0000-5266-C5E9B83A3490" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p26t.83tj_d2hj"><intent_id>619432</intent_id><project_id>730539</project_id><text_data>Job # 204679</text_data><comment_date>2014-03-10T00:00:00</comment_date></row><row _id="row-vkaf~3q99~byjp" _uuid="00000000-0000-0000-CC1F-1DA20C123C70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkaf~3q99~byjp"><intent_id>1416849</intent_id><project_id>1118808</project_id><text_data>JOB # 50579-1</text_data><comment_date>2024-04-05T00:00:00</comment_date></row><row _id="row-q8th~5rnv_c3mw" _uuid="00000000-0000-0000-5EB3-86E9357EC45F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8th~5rnv_c3mw"><intent_id>902026</intent_id><project_id>849706</project_id><text_data>service and inspect oil furnace.</text_data><comment_date>2018-05-02T00:00:00</comment_date></row><row _id="row-pzvj.ucv3-msdj" _uuid="00000000-0000-0000-5BF5-71D23E5BEC07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pzvj.ucv3-msdj"><intent_id>1026709</intent_id><project_id>898439</project_id><text_data>WM will hire R Transport for trucking</text_data><comment_date>2019-12-12T00:00:00</comment_date></row><row _id="row-jkt8~tats.zvfm" _uuid="00000000-0000-0000-43FF-05999E135398" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jkt8~tats.zvfm"><intent_id>1108559</intent_id><project_id>942802</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2020-12-09T00:00:00</comment_date></row><row _id="row-su37.fh4u.wisc" _uuid="00000000-0000-0000-62C5-98A804168D67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-su37.fh4u.wisc"><intent_id>865322</intent_id><project_id>827774</project_id><text_data>We have workers comp insurance with liberty mutual in oregon</text_data><comment_date>2017-09-26T00:00:00</comment_date></row><row _id="row-3vi9-hf9i_xyg9" _uuid="00000000-0000-0000-2407-11C53BC44165" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vi9-hf9i_xyg9"><intent_id>1160612</intent_id><project_id>966716</project_id><text_data>121014-001</text_data><comment_date>2021-07-15T00:00:00</comment_date></row><row _id="row-w9vg~fcsc.rxc4" _uuid="00000000-0000-0000-310F-FD329EA50EA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9vg~fcsc.rxc4"><intent_id>449232</intent_id><project_id>663389</project_id><text_data>General Laborers-hand-digging,raking - shovels, rakes;  other small tools and equipmentTruck Driver - Other Trucks - Water Trucks less than 4000 gallons</text_data><comment_date>2011-04-08T00:00:00</comment_date></row><row _id="row-ybbs_2zib_358g" _uuid="00000000-0000-0000-8B4D-0F6099FE6530" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ybbs_2zib_358g"><intent_id>962727</intent_id><project_id>816213</project_id><text_data>filed by alice wong jame</text_data><comment_date>2019-02-28T00:00:00</comment_date></row><row _id="row-q3jn-kf9d_7vdq" _uuid="00000000-0000-0000-3E99-AC6F4BFD1DCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q3jn-kf9d_7vdq"><intent_id>482085</intent_id><project_id>675780</project_id><text_data>THERE ARE 55 UNITS IN THIS PACKAGE INCLUDING 1 - 4 PLEX AND 1 - TRIPLEX AND 48 SINGLE FAMILY DWELLINGS.  THEY VARY FROM 1 FLOOR TO 2 FLOORS. THE BUILDINGS ARE PERMANENT FAMILY RESIDENCES AND EACH HAVE A SELF CONTAINED KITCHEN.  THEY EACH HAVE A BATHROOM. THERE IS NO MANAGER'S OFFICE ON SITE IN THE MULTI FAMILY UNITS.</text_data><comment_date>2011-10-05T00:00:00</comment_date></row><row _id="row-9ue9_6xin-hcr6" _uuid="00000000-0000-0000-0BAD-47F976D583C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ue9_6xin-hcr6"><intent_id>1465611</intent_id><project_id>1117860</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-kwxm_iiet~g7fj" _uuid="00000000-0000-0000-F64D-6ED8D12E911E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kwxm_iiet~g7fj"><intent_id>590500</intent_id><project_id>718765</project_id><text_data>Only 3 residences - windows strip replacement and Ductless Heat Pump/Ventilation to be done on each:  1.  W 50 Skokomish Valley Rd, Shelton, WA  98584  2.  W 80 Skokomish Valley Rd, Shelton, WA  98584  3.  411 Deyette Rd, Shelton, WA  98584These are all single family dwellings, all one story, used as homes to the Fish &amp; Wildlife employees as permanent residences while employed there.  There is no Commercial use, rehab, transitional housing, communal dining, treatment services, dorms, counseling, rental of rooms.  Each building has its own kitchen and bathroom.  There is no facility or manager's office on site.  They are not used by members of the public.</text_data><comment_date>2013-09-03T00:00:00</comment_date></row><row _id="row-f429.x4cs_7xuh" _uuid="00000000-0000-0000-2579-84CDB3491B1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f429.x4cs_7xuh"><intent_id>1112340</intent_id><project_id>932147</project_id><text_data>2009-3639 - RESUBMIT</text_data><comment_date>2020-12-29T00:00:00</comment_date></row><row _id="row-izz4_t6pz~627v" _uuid="00000000-0000-0000-864D-43341657DE7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-izz4_t6pz~627v"><intent_id>638050</intent_id><project_id>710677</project_id><text_data>My name is Shad Dawes and i am the owner/operator of First Class Flooring. I am a journeyman soft floor layer and the only employee that i will have on this project will be an apprentice working under my direct supervision. Thank you.</text_data><comment_date>2014-06-29T00:00:00</comment_date></row><row _id="row-xnkx_z2x3.s5hy" _uuid="00000000-0000-0000-AC3B-3E0BA2CBA4B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xnkx_z2x3.s5hy"><intent_id>793500</intent_id><project_id>794356</project_id><text_data>Filed by Linnie ShaverState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- Olympic View Middle SchoolPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?Remodel existing building 2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.) Does this project entail the remodeling or new construction of a facility?No.4.) If your firm is working upon a type of building system, what type of system is involved? HVAC Controls5.) What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.) Are you going to be hiring any subcontractors for this project?Yes.</text_data><comment_date>2016-10-03T00:00:00</comment_date></row><row _id="row-ucyq.4dty~4mcs" _uuid="00000000-0000-0000-FB7D-92B2C009B7D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ucyq.4dty~4mcs"><intent_id>577311</intent_id><project_id>712753</project_id><text_data>Project #90192 - BP #201</text_data><comment_date>2013-06-25T00:00:00</comment_date></row><row _id="row-i2g6-sx4c-3xfm" _uuid="00000000-0000-0000-8322-9E7A4DCE9F12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2g6-sx4c-3xfm"><intent_id>902748</intent_id><project_id>849988</project_id><text_data>Install (13) access points and related antennas on customer provided light pole.</text_data><comment_date>2018-05-04T00:00:00</comment_date></row><row _id="row-kpyx-deu9-8yd2" _uuid="00000000-0000-0000-1D3D-B807259DE981" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kpyx-deu9-8yd2"><intent_id>972637</intent_id><project_id>860697</project_id><text_data>We have three employees working 1 - 2 hours daily and nightly fueling equipment approximately 7 - 12 hours total a week.</text_data><comment_date>2019-04-19T00:00:00</comment_date></row><row _id="row-thhf_xmnh~avt6" _uuid="00000000-0000-0000-7E38-259B64AED5C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thhf_xmnh~avt6"><intent_id>592447</intent_id><project_id>719501</project_id><text_data>FIled by Steven B. Morgan.</text_data><comment_date>2013-09-09T00:00:00</comment_date></row><row _id="row-n359~emts-wabm" _uuid="00000000-0000-0000-BD4F-44D59592BBD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n359~emts-wabm"><intent_id>591747</intent_id><project_id>715259</project_id><text_data>Filed by Robert Crestik</text_data><comment_date>2013-09-04T00:00:00</comment_date></row><row _id="row-uzc2.g54m.gdw2" _uuid="00000000-0000-0000-F347-7C57DBC8785B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzc2.g54m.gdw2"><intent_id>653013</intent_id><project_id>743809</project_id><text_data>Martin Fantoni is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height. The home is not open to the public and does not have a business. The electricians will be repairing some electrical and running a new circuit for furnace. This job meets the residential job requirements.</text_data><comment_date>2014-09-08T00:00:00</comment_date></row><row _id="row-82ac.gyja-6cn4" _uuid="00000000-0000-0000-AE1A-4C8A1E149D65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-82ac.gyja-6cn4"><intent_id>1317654</intent_id><project_id>1062153</project_id><text_data>We will use a lawn mower to mow the lawn on a regular schedule. We will use a blower to move grass clippings from the walkways and plant beds. We will perform periodic monitoring of the irrigation system and make adjustments as needed to assure healthy vegetation. We will use an edger to ensure that lawn areas are neat in appearance. We will remove weeds from plant beds and ensure that the property looks properly cared for.</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-eyxc~az5t~hj2a" _uuid="00000000-0000-0000-FE96-7DA6F27B1E65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eyxc~az5t~hj2a"><intent_id>777794</intent_id><project_id>792325</project_id><text_data>Hauling of materials</text_data><comment_date>2016-07-27T00:00:00</comment_date></row><row _id="row-wqf7~zuwn-9uhs" _uuid="00000000-0000-0000-53D0-A9017CF00FA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wqf7~zuwn-9uhs"><intent_id>513857</intent_id><project_id>688405</project_id><text_data>We will be installing plantings only.  No irrigation no heavy equipment. We will be using a Bobcat skidsteer shovels, picks rakes and wheel barrels to place approximately 60 yards topsoi and 74 yards compost mulch.</text_data><comment_date>2012-05-28T00:00:00</comment_date></row><row _id="row-4g9n.7zhk~6vtu" _uuid="00000000-0000-0000-4108-346D7B5A1FF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4g9n.7zhk~6vtu"><intent_id>994606</intent_id><project_id>888282</project_id><text_data>SRVCE0095264 SC#190103-0105 Two hours remote session, two hours onsite work performed.</text_data><comment_date>2019-07-25T00:00:00</comment_date></row><row _id="row-erxv~wa5d-qcdx" _uuid="00000000-0000-0000-5290-B1DEEEF03521" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-erxv~wa5d-qcdx"><intent_id>1008729</intent_id><project_id>893882</project_id><text_data>Our fringe benefit package is $2.99 for medical, dental and vision insurance, $1.60 for paid time off benefits, $0.05 for life insurance and the balance for retirement benefits. Our retirement plan is fully compliant with prevailing wage and Davis Bacon laws, including immediate enrollment and 100% vesting of funds.General Laborer job description: General site cleanup, preparing the jobsite, loading and receiving materials and tools, construct temporary structures to support other crafts, safety watch for other crafts.</text_data><comment_date>2019-09-20T00:00:00</comment_date></row><row _id="row-swsv_vjcg.dv2p" _uuid="00000000-0000-0000-26D2-736F0C916A94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-swsv_vjcg.dv2p"><intent_id>1148918</intent_id><project_id>964667</project_id><text_data>Install 1 new WS in the interview roominside workelect tech(06)</text_data><comment_date>2021-06-01T00:00:00</comment_date></row><row _id="row-uwwf~y3p8-7yf2" _uuid="00000000-0000-0000-828D-7A984AEE4CB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwwf~y3p8-7yf2"><intent_id>503334</intent_id><project_id>683957</project_id><text_data>Sent email:  Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor).  For this Intent filing firms are to enter �Time and Materials� for  the dollar amount of the contract as an exact dollar amount cannot be identified at the time of filing. To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  When filing these forms, the dollar amount of the contract (which is the total amount that will be invoiced), including tax, will be entered on the form along with a short explanation in the notes section about the nature of the work so that the project can be tracked by the awarding agency and L&amp;I. In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures.  Please note that an on-call/blanket/annual contract may not be utilized for construction projects, new equipment purchase/installations, or for warranty work as these require their own set of Intent and Affidavit forms with the appropriate bid and award dates associated with those specific contracts.  The use of on-call/blanket/annual contracts is limited to minor maintenance and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period and Affidavits will then be filed off of that new form.  If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work.On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out.  This form filing requirement also applies to owner/operators.  Please follow this filing method on any contracts covered under this policy.  (RCW 39.12.040)We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.  A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2012-08-02T00:00:00</comment_date></row><row _id="row-jtck~f82u_zmqg" _uuid="00000000-0000-0000-3634-1C6FFF0E139B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jtck~f82u_zmqg"><intent_id>1187754</intent_id><project_id>984890</project_id><text_data>Moon Job # 54-100808</text_data><comment_date>2021-10-22T00:00:00</comment_date></row><row _id="row-6qyn-kd6b_y6as" _uuid="00000000-0000-0000-E973-E2DF508D6AA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6qyn-kd6b_y6as"><intent_id>580411</intent_id><project_id>699409</project_id><text_data>This intent is for Franklin Elementary School only (A separate intent# 580403 was filed for Harney Elementary School)Prime Contractor - Colf Construction LLC (WA UBI# 603025698)Hiring Company - Mofford Electric Inc (WA UBI# 061000842)SimplexGrinnell - (WA UBI# 602113334)</text_data><comment_date>2013-07-11T00:00:00</comment_date></row><row _id="row-s8k6-veta~m4ev" _uuid="00000000-0000-0000-0250-B5FC04650BDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s8k6-veta~m4ev"><intent_id>610722</intent_id><project_id>721816</project_id><text_data>***We are a temporary labor outsourcing agency, we are not required to have a contractors registration # ******We do not have an industrial insurance account as we are self insured***</text_data><comment_date>2014-01-06T00:00:00</comment_date></row><row _id="row-tp36-xynv.2ych" _uuid="00000000-0000-0000-7C5A-5A14330CD986" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tp36-xynv.2ych"><intent_id>1087303</intent_id><project_id>932324</project_id><text_data>SR#: 47562950</text_data><comment_date>2020-09-11T00:00:00</comment_date></row><row _id="row-bz4a-n7nt_4r74" _uuid="00000000-0000-0000-8776-A78FDD17AB05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bz4a-n7nt_4r74"><intent_id>736303</intent_id><project_id>769690</project_id><text_data>Hydroseeding contractor</text_data><comment_date>2015-12-07T00:00:00</comment_date></row><row _id="row-hb3a.zhau.j8z2" _uuid="00000000-0000-0000-1FA2-9111E5C17310" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hb3a.zhau.j8z2"><intent_id>972664</intent_id><project_id>871150</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install distribution cable for voice / data communications.  Install fiber optic and copper cables for communications backbone between equipment rooms.  Terminate cables in the equipment room and terminate the cables routed between Comm. equipment rooms.</text_data><comment_date>2019-04-19T00:00:00</comment_date></row><row _id="row-9897~fq6q~zi6w" _uuid="00000000-0000-0000-AB16-3202419ABD35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9897~fq6q~zi6w"><intent_id>901633</intent_id><project_id>846571</project_id><text_data>Filed by Nathan M. Herford</text_data><comment_date>2018-04-30T00:00:00</comment_date></row><row _id="row-kjda.cgtk_ew7a" _uuid="00000000-0000-0000-9E81-6FD06A494A8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kjda.cgtk_ew7a"><intent_id>1416995</intent_id><project_id>1118880</project_id><text_data>J#501725219</text_data><comment_date>2024-04-05T00:00:00</comment_date></row><row _id="row-5hjj~5kqq-nf9f" _uuid="00000000-0000-0000-FA9B-8BD955BA49B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5hjj~5kqq-nf9f"><intent_id>616798</intent_id><project_id>729356</project_id><text_data>Filed By: Michael Hummel1. What is the specific purpose of this awarding agency's public works project? Update the security alarm system and access controls for all Kent School District schools and administrative buildings.2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No3. Does this project entail the remodeling or new construction of a facility? No4. If your firm is working upon a type of building system, what type of system is involved? Burglar alarm system.5. What specific tasks did your employees perform? Siemens' SES Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the SES Technicians update program configurations and point inputs. The SES Technician typically sits in at control panel and manipulates the system using a computer program. The program itself informs a Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the SES Technician trains the end-user about automation system functionality, again using the computer interface. Importantly, SES Technicians do not use trade tools, such as drills or wrenches.6. What, if any, tools did your employees use in the performance of those tasks? Laptop computer.7. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No - None.8. Are you going to be hiring any subcontractors for this project? Yes.</text_data><comment_date>2014-02-18T00:00:00</comment_date></row><row _id="row-yngv_t823~jygq" _uuid="00000000-0000-0000-23CC-1D5C7347ADCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yngv_t823~jygq"><intent_id>1286594</intent_id><project_id>968437</project_id><text_data>PR86575 Shoreline College</text_data><comment_date>2022-11-30T00:00:00</comment_date></row><row _id="row-xnh3-es7f.a47s" _uuid="00000000-0000-0000-8856-7FBA2A196622" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xnh3-es7f.a47s"><intent_id>946090</intent_id><project_id>865262</project_id><text_data>Job# PAS 17-15-152-04</text_data><comment_date>2018-11-15T00:00:00</comment_date></row><row _id="row-4i27_3eze-n8cq" _uuid="00000000-0000-0000-2781-EBEA09B4A73D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4i27_3eze-n8cq"><intent_id>693233</intent_id><project_id>761699</project_id><text_data>#1 Install gas furnace and water heater (convert from electric to gas); #2 yes; #3 2; #4a no, #4b no, #4c yes, #4d no, #4e no, #4f no, #4g no, #4h no, #4i no, #4j no, #4k no; #5 yes; #6 yes, #7 no, #8 no</text_data><comment_date>2015-05-07T00:00:00</comment_date></row><row _id="row-ey7m_qbcw~xe44" _uuid="00000000-0000-0000-0566-1958086B1D6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ey7m_qbcw~xe44"><intent_id>523009</intent_id><project_id>691853</project_id><text_data>Truck is an F550 Used to transport equipment and materials to and from the job site.</text_data><comment_date>2012-07-18T00:00:00</comment_date></row><row _id="row-nr5w_wbwq-24q6" _uuid="00000000-0000-0000-43D0-4FB6379FCAA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nr5w_wbwq-24q6"><intent_id>1280902</intent_id><project_id>1039215</project_id><text_data>650018807 WSU Abelson</text_data><comment_date>2022-11-03T00:00:00</comment_date></row><row _id="row-whuv-zutg.ff4s" _uuid="00000000-0000-0000-A286-DC22F8773F96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-whuv-zutg.ff4s"><intent_id>502754</intent_id><project_id>683703</project_id><text_data>Form filed by: Mark Houghton</text_data><comment_date>2012-03-05T00:00:00</comment_date></row><row _id="row-22ga_7dc2_jdj5" _uuid="00000000-0000-0000-0C1D-7820E7668EAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22ga_7dc2_jdj5"><intent_id>818302</intent_id><project_id>769834</project_id><text_data>302087 stewart ms</text_data><comment_date>2017-02-28T00:00:00</comment_date></row><row _id="row-w8ks.8dwz~25e4" _uuid="00000000-0000-0000-C849-FD7DD9185377" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w8ks.8dwz~25e4"><intent_id>1169906</intent_id><project_id>975469</project_id><text_data>Contract 33606, Customer 201368/1/2021 thru 7/31/2022</text_data><comment_date>2021-08-17T00:00:00</comment_date></row><row _id="row-x5e2~jg97-5nq2" _uuid="00000000-0000-0000-C6BD-855711867FAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x5e2~jg97-5nq2"><intent_id>752495</intent_id><project_id>787752</project_id><text_data>046049</text_data><comment_date>2016-03-21T00:00:00</comment_date></row><row _id="row-bdfi.9qyc-d6vy" _uuid="00000000-0000-0000-2DED-40A540F73F69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bdfi.9qyc-d6vy"><intent_id>479747</intent_id><project_id>674993</project_id><text_data>Our current processing method for on-call/blanket/annual contracts is to require that the contractor and each and every subcontractor file an Intent for their first work under the contract (for instance the first call-out for the contractor).  To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  In addition, if you are acting at the prime contractor, you must ensure that all subcontractors follow the outlined procedures.  Please be sure to follow this process to avoid future delay in form approval and payment based on that approval.  (RCW 39.12.040)</text_data><comment_date>2011-11-22T00:00:00</comment_date></row><row _id="row-p5vt.hyft_ym9n" _uuid="00000000-0000-0000-F1AB-3DE377BB5198" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p5vt.hyft_ym9n"><intent_id>974023</intent_id><project_id>875184</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2019-04-25T00:00:00</comment_date></row><row _id="row-rqr4_vq8i.s8du" _uuid="00000000-0000-0000-DB2B-A632F11E3541" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rqr4_vq8i.s8du"><intent_id>1143904</intent_id><project_id>961958</project_id><text_data>0721035</text_data><comment_date>2021-05-12T00:00:00</comment_date></row><row _id="row-m8wk.m3uc-x7z4" _uuid="00000000-0000-0000-61C1-9BC07DB041B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8wk.m3uc-x7z4"><intent_id>764643</intent_id><project_id>791195</project_id><text_data>AFTER 7/1/2016 Fringes:  NWDC - $2.27; Vacation - $1.50; Scholarship Fund:  $.01; NW Pension - $7.63; National Pension - $4.24; Health Care - $11.64; ITI - $.17; Apprentice Fund - $1.10; Industry Fund - $.65; Org Trust - $1.00; NW Supp - $.79</text_data><comment_date>2016-06-30T00:00:00</comment_date></row><row _id="row-qck7~aaae.9vtz" _uuid="00000000-0000-0000-1943-40640898D67C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qck7~aaae.9vtz"><intent_id>579597</intent_id><project_id>709519</project_id><text_data>Job # 531864 related to C12065</text_data><comment_date>2013-07-08T00:00:00</comment_date></row><row _id="row-rt6h_8efs.pw28" _uuid="00000000-0000-0000-C1FB-B150547E6650" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rt6h_8efs.pw28"><intent_id>753427</intent_id><project_id>786197</project_id><text_data>Subcontract #90477sub3 / 8871 Franklin Co.Blanket Intent for 2016</text_data><comment_date>2016-03-25T00:00:00</comment_date></row><row _id="row-yu2r~i8yr_g4bu" _uuid="00000000-0000-0000-9FA5-2BD10F62B823" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yu2r~i8yr_g4bu"><intent_id>693439</intent_id><project_id>761423</project_id><text_data>Install Insulation, Single Family, Single Story, No, No, Yes, No, No, No, No, No, No, No, No, Yes, Yes, No, No</text_data><comment_date>2015-05-08T00:00:00</comment_date></row><row _id="row-u4xq-csek-t82f" _uuid="00000000-0000-0000-2E94-AC8915B72D10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u4xq-csek-t82f"><intent_id>770108</intent_id><project_id>786697</project_id><text_data>Driver #2 Fringe breakdown:vacation: $1.32, medical: $2.77, Pen $0.68 =$4.77</text_data><comment_date>2016-06-29T00:00:00</comment_date></row><row _id="row-e75a_z8vr_dtsz" _uuid="00000000-0000-0000-CCC8-A5D75F3BE645" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e75a_z8vr_dtsz"><intent_id>595475</intent_id><project_id>710252</project_id><text_data>No employees</text_data><comment_date>2013-09-23T00:00:00</comment_date></row><row _id="row-cuii-hzz6.c3i6" _uuid="00000000-0000-0000-1535-1A59501BF357" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cuii-hzz6.c3i6"><intent_id>588902</intent_id><project_id>718205</project_id><text_data>Filberto Zuniga, 4720 E K St., TacomaSusan Say, 3806 S 34th, Tacoma</text_data><comment_date>2013-08-20T00:00:00</comment_date></row><row _id="row-m8pa~cq8n~hgvh" _uuid="00000000-0000-0000-619A-AFAA11B129C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8pa~cq8n~hgvh"><intent_id>528647</intent_id><project_id>693906</project_id><text_data>�	In order for us to consider whether the residential rate is appropriately applied, please specifically answer the following questions about the facility: �	#1 - Is the structure a single family dwelling, duplex, apartment, condominium or other residential structure? Yes�	#2 - Including any basement or garage, how many stories or levels does the structure have? 2�	#3 - What is the facility used for? --Answer �yes� or �no� to each of the following options: (a) Permanent residence only? Yes�	(b) Rehabilitation house? No�	(c) Transitional housing? No�	(d) Communal dining facility? No �	(e) Treatment services? No�	(f) Counseling? NO�	(g) Other? �	#4 - Does each dwelling unit have its own self-contained kitchen? Yes�	#5 - Does each dwelling unit have its own bathroom? Yes�	#6 - Is there a community facility or manager�s office on site? No �	#7 - Is any part of the facility used by members of the public? No</text_data><comment_date>2012-08-17T00:00:00</comment_date></row><row _id="row-ayaz.jc2g.gvfz" _uuid="00000000-0000-0000-5909-D698CC1C3DC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ayaz.jc2g.gvfz"><intent_id>1022241</intent_id><project_id>891137</project_id><text_data>Other trucks is being used for a Sweeper Truck</text_data><comment_date>2019-11-18T00:00:00</comment_date></row><row _id="row-2a2w_e9ch.3g95" _uuid="00000000-0000-0000-782E-6EE2ADCE7EC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2a2w_e9ch.3g95"><intent_id>1160405</intent_id><project_id>970722</project_id><text_data>wage is correct, employee is paid on commission</text_data><comment_date>2021-08-03T00:00:00</comment_date></row><row _id="row-g3id~5tct~p8nj" _uuid="00000000-0000-0000-6F15-28F2D8A7EAD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g3id~5tct~p8nj"><intent_id>1133285</intent_id><project_id>923567</project_id><text_data>Low voltageInside workelect tech(06)provide and install new cabling for new school</text_data><comment_date>2021-04-02T00:00:00</comment_date></row><row _id="row-5ixm~3gn6-7hbc" _uuid="00000000-0000-0000-715F-21CF3E20D13D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ixm~3gn6-7hbc"><intent_id>794521</intent_id><project_id>802655</project_id><text_data>We may or may not have an owner on thh this project</text_data><comment_date>2016-10-06T00:00:00</comment_date></row><row _id="row-56rf.gt49_tm6j" _uuid="00000000-0000-0000-723A-3D026833780F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-56rf.gt49_tm6j"><intent_id>1270647</intent_id><project_id>1033203</project_id><text_data>PTL SO# 170523</text_data><comment_date>2022-09-29T00:00:00</comment_date></row><row _id="row-8gvu_p56j-rbf4" _uuid="00000000-0000-0000-C56F-F144B0474310" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8gvu_p56j-rbf4"><intent_id>912119</intent_id><project_id>800790</project_id><text_data>HIRING CONTRACTOR:D M I DRILLING CONSTRUCTION</text_data><comment_date>2018-06-18T00:00:00</comment_date></row><row _id="row-vrbe-euxg-394p" _uuid="00000000-0000-0000-9A22-6CE6635A46B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vrbe-euxg-394p"><intent_id>610135</intent_id><project_id>725821</project_id><text_data>Other truck is a 2007 Sterling Box Van, GWT of 16,000 pounds, for delivery of manufactured materials to jobsite.Work performed is offsite manufacturing in our Tacoma facility.</text_data><comment_date>2013-12-30T00:00:00</comment_date></row><row _id="row-iavb.n8sy-ei84" _uuid="00000000-0000-0000-70B8-94C0F0A65E35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iavb.n8sy-ei84"><intent_id>1074342</intent_id><project_id>916582</project_id><text_data>Removing Woodchips and cleaning up area where woodchips were</text_data><comment_date>2020-07-22T00:00:00</comment_date></row><row _id="row-6y4q_ydyi-itp5" _uuid="00000000-0000-0000-48E8-1D8314756065" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6y4q_ydyi-itp5"><intent_id>1035211</intent_id><project_id>906570</project_id><text_data>COE - EMB Liebert Vault UnitEverett Municipal Bldg. (Wall St Bldg.)</text_data><comment_date>2020-01-31T00:00:00</comment_date></row><row _id="row-k5w9.rtqc~efa5" _uuid="00000000-0000-0000-A6BB-FB136BC887A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k5w9.rtqc~efa5"><intent_id>800640</intent_id><project_id>806894</project_id><text_data>To install cabling which can be used for telephone (voice over distance) and data (bits &amp; bytes)connections within the telecommunication system. This work will be performed indoors.</text_data><comment_date>2016-11-09T00:00:00</comment_date></row><row _id="row-tum9-i74t.4mjd" _uuid="00000000-0000-0000-600A-D57C4722EA9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tum9-i74t.4mjd"><intent_id>770024</intent_id><project_id>782245</project_id><text_data>a) the entire scope of the project is renewal for motel demolition.b) our portion of the project is to install hydroseed per specifications on designated and prepared area using a hydroseed installation truck. Hydroseed is a one-step process.</text_data><comment_date>2016-06-22T00:00:00</comment_date></row><row _id="row-t6t8_z5jt.25qe" _uuid="00000000-0000-0000-9699-C40543531547" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t6t8_z5jt.25qe"><intent_id>859648</intent_id><project_id>758006</project_id><text_data>Truck is an F550 used to transport equipment and materials to and form the job site</text_data><comment_date>2017-08-30T00:00:00</comment_date></row><row _id="row-kqg4.xxss.z9e8" _uuid="00000000-0000-0000-ECCA-12EC958D4482" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kqg4.xxss.z9e8"><intent_id>558565</intent_id><project_id>699047</project_id><text_data>Form filed by: Bill Throne1) What was/is the purpose of this project?    SEISMIC UPGRADE TO BRIDGE****2) Does this project entail the remodeling or new construction of a facility?   YES, REMODEL****3) What specific tasks did your employee perform?   WELDING INSPECTION****4) What, if any, tools did your employees use in the performance of those tasks?   ULTRASONIC SCOPE****5) If your employees used no tools, did they engage in any other type of manual hands-on efforts in completing their tasks?   VISUAL</text_data><comment_date>2013-03-05T00:00:00</comment_date></row><row _id="row-iueq_58ni.bmc4" _uuid="00000000-0000-0000-45BA-7775DD9E0F58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iueq_58ni.bmc4"><intent_id>930201</intent_id><project_id>860426</project_id><text_data>&amp;quot;POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)&amp;quot; USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2018-09-03T00:00:00</comment_date></row><row _id="row-bsdi.5nud~wd4u" _uuid="00000000-0000-0000-3DE6-870DC7D5A364" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bsdi.5nud~wd4u"><intent_id>942421</intent_id><project_id>864646</project_id><text_data>Other Trucks-1 ton pick up driver to haul equipment to jobsiteLaborers-dig hole and erect sign posts Traffic Control Striper-Pavement Markings</text_data><comment_date>2018-10-29T00:00:00</comment_date></row><row _id="row-tj7y-9g7n-gad8" _uuid="00000000-0000-0000-D86B-1212304CBDC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tj7y-9g7n-gad8"><intent_id>786629</intent_id><project_id>801434</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLANS IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2016-09-01T00:00:00</comment_date></row><row _id="row-vkcc-ict6_d6yu" _uuid="00000000-0000-0000-79D8-F1CFC787E5A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkcc-ict6_d6yu"><intent_id>528395</intent_id><project_id>693816</project_id><text_data>We have 5 specific areas within the city we are working</text_data><comment_date>2012-08-27T00:00:00</comment_date></row><row _id="row-d5ir.yqf8~uwxj" _uuid="00000000-0000-0000-99C1-52419B3344BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d5ir.yqf8~uwxj"><intent_id>794005</intent_id><project_id>804234</project_id><text_data>Adding Access control reader &amp; locking hardware, electric strike, to the back entry door nearest the Portables.</text_data><comment_date>2016-10-05T00:00:00</comment_date></row><row _id="row-tgup~aucd_wgra" _uuid="00000000-0000-0000-A1E3-4EF0B7820773" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tgup~aucd_wgra"><intent_id>722012</intent_id><project_id>772923</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install distribution cable for voice / data communications.  Install copper cables for communications backbone between equipment rooms.  Terminate cables in the equipment room and terminate the cables routed between Comm. equipment rooms.</text_data><comment_date>2015-09-22T00:00:00</comment_date></row><row _id="row-pcqw_r42d~ez25" _uuid="00000000-0000-0000-255B-12AC9AF7EF58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pcqw_r42d~ez25"><intent_id>899033</intent_id><project_id>848524</project_id><text_data>Our company, Desert Green Turf, will be removing grass by use of a fraze mower at Columbia playfields 1 &amp; 4.</text_data><comment_date>2018-04-17T00:00:00</comment_date></row><row _id="row-4q9z.9dmb_xqw5" _uuid="00000000-0000-0000-A29A-C15A07226940" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4q9z.9dmb_xqw5"><intent_id>1005822</intent_id><project_id>879864</project_id><text_data>Large semi truck with flatbed trailer</text_data><comment_date>2020-12-28T00:00:00</comment_date></row><row _id="row-ysdt-b34m~p9ek" _uuid="00000000-0000-0000-00E2-25AB535B10D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ysdt-b34m~p9ek"><intent_id>853932</intent_id><project_id>829631</project_id><text_data>Filed by Brandon Hoyt</text_data><comment_date>2017-08-10T00:00:00</comment_date></row><row _id="row-epwd.63xi.vj8h" _uuid="00000000-0000-0000-B154-BE09A52E36BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-epwd.63xi.vj8h"><intent_id>988080</intent_id><project_id>885763</project_id><text_data>? Pull, terminate, test and label new locations of (2) Cat6 cable (4 Locations)								? All work is to be performed during normal business hours � Monday � Friday, 7am to 5pm unless otherwise noted.</text_data><comment_date>2019-06-27T00:00:00</comment_date></row><row _id="row-s44y.37wm~8hhs" _uuid="00000000-0000-0000-D575-ACDAC895013E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s44y.37wm~8hhs"><intent_id>1286347</intent_id><project_id>1042552</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-12-21T00:00:00</comment_date></row><row _id="row-hxa7_vmkg-8xrk" _uuid="00000000-0000-0000-B636-858543646E2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxa7_vmkg-8xrk"><intent_id>961275</intent_id><project_id>873729</project_id><text_data>1. Repairs to residential structures.2. Yes3. 14. A-No, B-No, C-Yes, D-No, E-No, F-No, G-No, H-No, I-No, J-No, K-No, I-No5. Yes6. Yes7. No8. No</text_data><comment_date>2019-02-20T00:00:00</comment_date></row><row _id="row-wfv2-g8yc-ymxt" _uuid="00000000-0000-0000-FF0E-0B11109D929B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wfv2-g8yc-ymxt"><intent_id>880314</intent_id><project_id>839956</project_id><text_data>This is for the application of preventative de-ice materials and anti-ice materials by use of a spreader on a truck or in a push spreader much like you might use to spread grass seed on your lawn.  It will also include drivers of snow plows and laborers with shovels should there be accumulations of snow.</text_data><comment_date>2017-12-20T00:00:00</comment_date></row><row _id="row-qk8k~8sai~bhdf" _uuid="00000000-0000-0000-DFEA-A4106F121AD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qk8k~8sai~bhdf"><intent_id>1159960</intent_id><project_id>960122</project_id><text_data>Installation of (10) Cat6 data and (8) Security Cameras</text_data><comment_date>2021-07-13T00:00:00</comment_date></row><row _id="row-p5yt_u2qr-wzfv" _uuid="00000000-0000-0000-2C57-0893DCAAFED3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p5yt_u2qr-wzfv"><intent_id>759159</intent_id><project_id>790700</project_id><text_data>Relocate voice/data cables from JK#500 to WS: L126 to be used for either telephone (voice over distance) or data (bits and bytes) connection which is part of the telecommunications system.  All work will be performed indoors.</text_data><comment_date>2016-04-28T00:00:00</comment_date></row><row _id="row-qa7e-pthj.5kt9" _uuid="00000000-0000-0000-A429-B5472BB6F47A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qa7e-pthj.5kt9"><intent_id>669182</intent_id><project_id>750449</project_id><text_data>Tom Gibelyou, Owner will be performing all work associated with this project.  Thank you</text_data><comment_date>2014-12-10T00:00:00</comment_date></row><row _id="row-zev9.ihbh~fv75" _uuid="00000000-0000-0000-BF7C-58491E020C36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zev9.ihbh~fv75"><intent_id>727892</intent_id><project_id>740544</project_id><text_data>Scope of Work: Level area and provide proper drainage path for any sheet flow/show run offInstall landscape fabricInstall drain field rockInstall rock up to 3 inch levelEquipment to be used is skid steer, hand tools such as shovels and rakes</text_data><comment_date>2015-10-22T00:00:00</comment_date></row><row _id="row-k7nn_3ez5_6ufj" _uuid="00000000-0000-0000-0759-CB39E45F4ED3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7nn_3ez5_6ufj"><intent_id>922596</intent_id><project_id>856875</project_id><text_data>WRS Job #P18-280PW</text_data><comment_date>2018-08-01T00:00:00</comment_date></row><row _id="row-48if~c4zi.j9yt" _uuid="00000000-0000-0000-5BDA-4727EBA318F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48if~c4zi.j9yt"><intent_id>632959</intent_id><project_id>732728</project_id><text_data>We have a concrete cutter in the Electrician's union (local 46) to cover jobs that specifically require an electrician to perform our work.  This worker uses various concrete cutting tools - slab saw, core drill, etc.</text_data><comment_date>2014-06-04T00:00:00</comment_date></row><row _id="row-4hx8-b4pe_jan5" _uuid="00000000-0000-0000-445A-D32AB483FB61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4hx8-b4pe_jan5"><intent_id>848165</intent_id><project_id>827422</project_id><text_data>Job #2408 - Daikin Ductless Split System</text_data><comment_date>2017-07-18T00:00:00</comment_date></row><row _id="row-8psc_p66s-4759" _uuid="00000000-0000-0000-94E6-1157B6781789" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8psc_p66s-4759"><intent_id>499091</intent_id><project_id>682222</project_id><text_data>We will have one employee working on the job</text_data><comment_date>2012-02-03T00:00:00</comment_date></row><row _id="row-jgzx-6j8x-wvr2" _uuid="00000000-0000-0000-E95E-8B3D03685B79" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgzx-6j8x-wvr2"><intent_id>737802</intent_id><project_id>780837</project_id><text_data>WORK PERFORMED BY TELECOMMUNICATION TECHNICIANS IS INSTALLING TELECOMMUNICATIONS CABLING CATEGORY 6 FOR VOICE (TELEPHONE) AND DATA (COMPUTER NETWORKING) INDOORS</text_data><comment_date>2015-12-15T00:00:00</comment_date></row><row _id="row-cgef.97d9.78cu" _uuid="00000000-0000-0000-3D93-E1ED720A2126" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cgef.97d9.78cu"><intent_id>614925</intent_id><project_id>728149</project_id><text_data>ALL OF THE $14.33 PER HOUR FRINGE GOES TO THE: UMEMPLOYMENT BENEFIT PLAN</text_data><comment_date>2014-02-05T00:00:00</comment_date></row><row _id="row-ub64-pkzd-f8uj" _uuid="00000000-0000-0000-4F49-ABB8886F3F30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ub64-pkzd-f8uj"><intent_id>1236152</intent_id><project_id>1011639</project_id><text_data>GU Job #22154pwTruck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2022-05-24T00:00:00</comment_date></row><row _id="row-cgez_2vez_nesp" _uuid="00000000-0000-0000-C4F3-A171E3976913" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cgez_2vez_nesp"><intent_id>727510</intent_id><project_id>741211</project_id><text_data>Filed by Steve MalitoProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the above crafts/trades/occupations.</text_data><comment_date>2015-10-21T00:00:00</comment_date></row><row _id="row-zniq.zp4z~sqt8" _uuid="00000000-0000-0000-A8B2-C0727939861F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zniq.zp4z~sqt8"><intent_id>686693</intent_id><project_id>758917</project_id><text_data>03-31-15 - Notice to proceed for Apr 1, 2015, 110 calendar days</text_data><comment_date>2015-03-31T00:00:00</comment_date></row><row _id="row-exqd.f8sx~8w2g" _uuid="00000000-0000-0000-EE28-587D0EE3ECE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-exqd.f8sx~8w2g"><intent_id>1165953</intent_id><project_id>961297</project_id><text_data>The total Fringe Benefit Breakdown consists of Hourly Life Insurance $.07, Hourly Medical, Hourly Pension, Hourly Vacation, and Hourly Holiday. The amounts will vary by employee. The total Hourly wage/fringe per hour will be $49.75 for this job.</text_data><comment_date>2021-08-11T00:00:00</comment_date></row><row _id="row-tzdn~5ksj-3ve2" _uuid="00000000-0000-0000-21B2-89594043B6BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzdn~5ksj-3ve2"><intent_id>1037552</intent_id><project_id>907969</project_id><text_data>1-Window removal and installation 2-Yes- Apartment unit 3- two stories 4a-No 4b- No 4c- Yes 4d- No 4e- No 4f- No 4g- No 4h- No 4i- No 4j- No 4k- No 4l- No 5-Yes 6- Yes 7- No 8-No</text_data><comment_date>2020-03-03T00:00:00</comment_date></row><row _id="row-w2ve.qiji.29tu" _uuid="00000000-0000-0000-B8BD-967FC32B8CA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w2ve.qiji.29tu"><intent_id>1141762</intent_id><project_id>860697</project_id><text_data>Walton will have an onsite install manager to supervise subcontracted laborers and apprentices. Walton's install supervisor is a salary employee that will not be performing any installation work, this person will act solely as a site supervisor and Walton representative.</text_data><comment_date>2021-05-05T00:00:00</comment_date></row><row _id="row-hnic-ax9c~cz5z" _uuid="00000000-0000-0000-CFB7-B4CFE8F0B959" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hnic-ax9c~cz5z"><intent_id>485580</intent_id><project_id>673778</project_id><text_data>PRIME JOB # 3113469</text_data><comment_date>2011-10-25T00:00:00</comment_date></row><row _id="row-gxam-xt6b~iwvx" _uuid="00000000-0000-0000-5963-16F5E8C28D1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gxam-xt6b~iwvx"><intent_id>529373</intent_id><project_id>684456</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-09-27T00:00:00</comment_date></row><row _id="row-yvyy.b9g6.fusf" _uuid="00000000-0000-0000-31A2-B56A412A2AB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yvyy.b9g6.fusf"><intent_id>685826</intent_id><project_id>758513</project_id><text_data>Filed by Carlos M. Hale</text_data><comment_date>2015-03-26T00:00:00</comment_date></row><row _id="row-hu63-qzt8_yf4e" _uuid="00000000-0000-0000-4088-740376F76F05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hu63-qzt8_yf4e"><intent_id>544489</intent_id><project_id>695916</project_id><text_data>Truck Driver Other:Hook-lift Truck58000GVWHaul Debris Cans</text_data><comment_date>2012-11-16T00:00:00</comment_date></row><row _id="row-2k6n.5mma_8crr" _uuid="00000000-0000-0000-7C58-E1F1CC5FE779" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2k6n.5mma_8crr"><intent_id>563318</intent_id><project_id>708267</project_id><text_data>This project is exempt from state prevailing wage requirements pursuant to The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage rates for the following crafts/trades.</text_data><comment_date>2013-04-05T00:00:00</comment_date></row><row _id="row-4r9e~49xb-bgfq" _uuid="00000000-0000-0000-37B7-E6FFEDD04CAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4r9e~49xb-bgfq"><intent_id>627040</intent_id><project_id>727605</project_id><text_data>&amp;quot;TRUCK DRIVER OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND OR 2000-4000 GALLON WATER TRUCK; &amp;quot;POWER EQUIPMENT OPERATOR MOTOR PATROL GRADER FINISHER&amp;quot; - NOT MOTOR PATROL, VACTOR GUZZLER/VACCON SUPER SUCKER</text_data><comment_date>2014-04-29T00:00:00</comment_date></row><row _id="row-pe2i_kwe9.m5nb" _uuid="00000000-0000-0000-108A-E6EAAB0AD51F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pe2i_kwe9.m5nb"><intent_id>1125306</intent_id><project_id>952326</project_id><text_data>SC 210114-0080</text_data><comment_date>2021-02-26T00:00:00</comment_date></row><row _id="row-pgp8_bkmi-zmx4" _uuid="00000000-0000-0000-1E44-DF6AB189E9F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pgp8_bkmi-zmx4"><intent_id>793494</intent_id><project_id>804042</project_id><text_data>A) Remove and replace sheetrock ceiling, prime and paint ceiling, remove and replace roof, and repair downspout.B) Remove construction debris from site and clean up site.</text_data><comment_date>2016-10-05T00:00:00</comment_date></row><row _id="row-hjs3~y53q~b6rd" _uuid="00000000-0000-0000-2336-AECAEF688BB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjs3~y53q~b6rd"><intent_id>1232899</intent_id><project_id>975032</project_id><text_data>This project was about removing and arranging the tiles of the playground , as once the rugs were removed , the leftover soil had to be removed and cleaned in the area</text_data><comment_date>2022-05-11T00:00:00</comment_date></row><row _id="row-fgyr.bfq2~wex6" _uuid="00000000-0000-0000-2D7C-037D4E565B10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fgyr.bfq2~wex6"><intent_id>644630</intent_id><project_id>706602</project_id><text_data>peo drive and operates vacuum truck, laborer handles hoses2.01 per hour fringe is medical dental vision life and .74 for vacation and holiday</text_data><comment_date>2014-07-30T00:00:00</comment_date></row><row _id="row-wb5w-688j.tzg6" _uuid="00000000-0000-0000-EF06-F4BE6D0E1AC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wb5w-688j.tzg6"><intent_id>869863</intent_id><project_id>835412</project_id><text_data>JCI Number SR 1-54935889657</text_data><comment_date>2017-10-18T00:00:00</comment_date></row><row _id="row-di7z~id2p.npck" _uuid="00000000-0000-0000-7B77-ED24FB26A82B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-di7z~id2p.npck"><intent_id>453260</intent_id><project_id>665028</project_id><text_data>General Labor Duties to include trash and construction debris clean up around site during project, retrieve jobs site materials and tools and provide basic assistance to the carpenter tender on site.</text_data><comment_date>2011-05-12T00:00:00</comment_date></row><row _id="row-tvvk-jd3d.weia" _uuid="00000000-0000-0000-5B34-41B5C179DFAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tvvk-jd3d.weia"><intent_id>588383</intent_id><project_id>718011</project_id><text_data>The other truck will be used to mobilize equipment out to the job site.</text_data><comment_date>2013-08-19T00:00:00</comment_date></row><row _id="row-96x2~638j_mer7" _uuid="00000000-0000-0000-A9DD-1E870EF34D8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96x2~638j_mer7"><intent_id>624303</intent_id><project_id>731818</project_id><text_data>PENHALL JOB #230878OTHER TRUCK IS OIL DISPRESEMENT TRUCK.</text_data><comment_date>2014-04-10T00:00:00</comment_date></row><row _id="row-zpwx_gyvh.4545" _uuid="00000000-0000-0000-9430-C2FC7CE79FAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zpwx_gyvh.4545"><intent_id>1140907</intent_id><project_id>946706</project_id><text_data>1. What is the purpose of this project?     Structural Proprietary Anchor Inspection	 2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. (See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3))     No  3. Does this specific project entail the remodeling or new construction of a facility?     No  4. If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.   No 5. What specific tasks will your employees perform?  Inspection of structural proprietary anchors6. What, if any, tools will your employees use in the performance of those tasks?  None7. If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? No 8. Are you going to be hiring any subcontractors for this project? No</text_data><comment_date>2021-04-29T00:00:00</comment_date></row><row _id="row-4pna~pzfp_r99y" _uuid="00000000-0000-0000-51C0-E63882DB1E83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4pna~pzfp_r99y"><intent_id>589433</intent_id><project_id>718414</project_id><text_data>Wage rates updated for Laborer, Power Equipment Operator, and Truck Driver</text_data><comment_date>2013-09-09T00:00:00</comment_date></row><row _id="row-cugh~qu6j.nj9i" _uuid="00000000-0000-0000-F9FA-BA87D4041DF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cugh~qu6j.nj9i"><intent_id>888792</intent_id><project_id>836525</project_id><text_data>this work includes installation of topsoil and new plants</text_data><comment_date>2018-02-16T00:00:00</comment_date></row><row _id="row-y69n-wmhm~zk5m" _uuid="00000000-0000-0000-D782-F26F820778D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y69n-wmhm~zk5m"><intent_id>544067</intent_id><project_id>699537</project_id><text_data>6 mobile homes</text_data><comment_date>2012-11-11T00:00:00</comment_date></row><row _id="row-d5sj_6xqp_qy4s" _uuid="00000000-0000-0000-525F-2CD8EE184FF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d5sj_6xqp_qy4s"><intent_id>848838</intent_id><project_id>827671</project_id><text_data>Job #111500-001</text_data><comment_date>2017-07-20T00:00:00</comment_date></row><row _id="row-m8kf_u4m9_t8ca" _uuid="00000000-0000-0000-66A3-F8B314CADFEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8kf_u4m9_t8ca"><intent_id>1238681</intent_id><project_id>1016159</project_id><text_data>Replace FA panel in each building, and set up FA monitoring.</text_data><comment_date>2022-06-03T00:00:00</comment_date></row><row _id="row-2znc-sufm_ehbv" _uuid="00000000-0000-0000-E3ED-24DC7CB7D690" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2znc-sufm_ehbv"><intent_id>517844</intent_id><project_id>669643</project_id><text_data>GU Tie-In</text_data><comment_date>2012-06-20T00:00:00</comment_date></row><row _id="row-62za-erv4~ym9s" _uuid="00000000-0000-0000-5B2D-09370122AA9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-62za-erv4~ym9s"><intent_id>1267233</intent_id><project_id>1022666</project_id><text_data>Bella Terra will be hydroseeding with wood fiber mulch, WSDOT seed mix and fertilizer on this project. The project as a whole consists of</text_data><comment_date>2022-10-07T00:00:00</comment_date></row><row _id="row-nghf~vfwg~iyb7" _uuid="00000000-0000-0000-3898-A9479FE8BAA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nghf~vfwg~iyb7"><intent_id>769071</intent_id><project_id>792899</project_id><text_data>A) Interior and Exterior renovation of WWU Ridgeway Gamma housing complex in Bellingham, WA. B) Henifin Construction will be performing pressure washing and painting of the exterior of 8 apartment buildings and performing interior painting in renovated units in each building.C. Our crew will be operating boom-lifts, pressure washers, spray paint machines.</text_data><comment_date>2016-06-23T00:00:00</comment_date></row><row _id="row-jifp-vabv~hjjc" _uuid="00000000-0000-0000-69C3-6581E45C0BC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jifp-vabv~hjjc"><intent_id>627610</intent_id><project_id>732851</project_id><text_data>TOTAL FRINGE IS SENT TO A QUALIFIED PENSION PLAN.</text_data><comment_date>2014-05-06T00:00:00</comment_date></row><row _id="row-a7d4~3mdx~sw9b" _uuid="00000000-0000-0000-5F87-C934D26270ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7d4~3mdx~sw9b"><intent_id>819837</intent_id><project_id>815223</project_id><text_data>Signed by Christine Lake</text_data><comment_date>2017-03-09T00:00:00</comment_date></row><row _id="row-ckmk-swkk.8cab" _uuid="00000000-0000-0000-1559-8B974F34E1AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ckmk-swkk.8cab"><intent_id>789924</intent_id><project_id>785037</project_id><text_data>HYDROSEEDING WITH HYDROGRAPHIC SEEDER MACHINE.</text_data><comment_date>2016-09-19T00:00:00</comment_date></row><row _id="row-9m2t-6npd~23br" _uuid="00000000-0000-0000-62EB-1FF0AEB7AED9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9m2t-6npd~23br"><intent_id>648091</intent_id><project_id>699237</project_id><text_data>General contractors scope; Transportation Center facility for school bus parking &amp; maintenance.Our scope;�	Procuring of low voltage electrical permit and scheduling required inspections.�	Excavation, forming and pouring of 2 ea. 2�x2� gate operators pads.�	Excavation, forming and pouring of 1 ea.  18�x18� footings for entry system pedestal.�	Installation of pre made loops.�	Mounting and wiring of gate operators. �	Mounting and wiring Knox Switch. �	Testing of complete system and setting of final adjustments for smooth operation.Items Provided by Others:�	Trenching, installation of conduit and wire from gate operator to card reader entry system pedestal.�	Trenching under road for photo eye conduits and operator connection.�	120 VAC power to gate operators.</text_data><comment_date>2014-08-20T00:00:00</comment_date></row><row _id="row-ptey-p3yv.vica" _uuid="00000000-0000-0000-5CAF-B80568E20E4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ptey-p3yv.vica"><intent_id>762014</intent_id><project_id>790157</project_id><text_data>We have been hired to perform the certified Arborist work on this project. The work includes tree pruning, root treatment, air spade on roots and clearing. Tools used on this job will include saws, shovels, rakes, chipper and bucket truck. The owner will be working on the site with the crew.</text_data><comment_date>2016-05-13T00:00:00</comment_date></row><row _id="row-6y55-fgh5.8q2n" _uuid="00000000-0000-0000-87F5-5A896918CF87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6y55-fgh5.8q2n"><intent_id>1180217</intent_id><project_id>967270</project_id><text_data>JCI Project # 650089076=Glenwood ES - 650089121=Skyline ES</text_data><comment_date>2021-09-23T00:00:00</comment_date></row><row _id="row-9wd7.bvuz-6gtu" _uuid="00000000-0000-0000-BF7E-086D3D4F29AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9wd7.bvuz-6gtu"><intent_id>494066</intent_id><project_id>516137</project_id><text_data>Bayley Project No. 10123</text_data><comment_date>2011-12-20T00:00:00</comment_date></row><row _id="row-5pc6-e2zf~ri6i" _uuid="00000000-0000-0000-9741-F833629115B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5pc6-e2zf~ri6i"><intent_id>1080424</intent_id><project_id>929147</project_id><text_data>Work performed by the Telecommunication Technicians is installing Category 5e and Category 6 cabling for voice and data indoors. POWERCOM JOB# 420981</text_data><comment_date>2020-08-14T00:00:00</comment_date></row><row _id="row-9ga9_s567-zuux" _uuid="00000000-0000-0000-B0E1-CDA3D15874D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ga9_s567-zuux"><intent_id>781628</intent_id><project_id>799517</project_id><text_data>Installation of 2 Cat 6 cabled from comm room to center of office for Voice over Ethernet.</text_data><comment_date>2016-08-11T00:00:00</comment_date></row><row _id="row-j5vx_cgfp-vdjc" _uuid="00000000-0000-0000-54A8-8862F008661E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j5vx_cgfp-vdjc"><intent_id>1284232</intent_id><project_id>1027973</project_id><text_data>$32.13 Fringe package includes: $9.70 health, $11.00 pension, $7.95 annuity, $2.40 paid time off, $0.77 apprenticeship, $0.31 impact</text_data><comment_date>2022-11-16T00:00:00</comment_date></row><row _id="row-m23j.wv5x_2rda" _uuid="00000000-0000-0000-E7C2-4F91B1B4C0E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m23j.wv5x_2rda"><intent_id>1274337</intent_id><project_id>1016281</project_id><text_data>Sedro Woolley High School1235 3rd StSedro Woolley, WA 98284-1610Invoice 35524556</text_data><comment_date>2022-10-12T00:00:00</comment_date></row><row _id="row-5spt~gbif.de8y" _uuid="00000000-0000-0000-D136-7BA38C18145C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5spt~gbif.de8y"><intent_id>781872</intent_id><project_id>799595</project_id><text_data>Ibanez is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The electrician will be installing a new bathroom fan. This job meets the residential job requirements.</text_data><comment_date>2016-08-12T00:00:00</comment_date></row><row _id="row-hpdy~ef8n~y3jw" _uuid="00000000-0000-0000-0529-B281F266786D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hpdy~ef8n~y3jw"><intent_id>1106391</intent_id><project_id>941589</project_id><text_data>2009-1261</text_data><comment_date>2020-11-30T00:00:00</comment_date></row><row _id="row-5kst.6bib_ywa2" _uuid="00000000-0000-0000-702B-48A2FC1421F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5kst.6bib_ywa2"><intent_id>641866</intent_id><project_id>739637</project_id><text_data>113 16th St. SW Puyallup, WA 98371</text_data><comment_date>2014-07-17T00:00:00</comment_date></row><row _id="row-45jq~eg7z-wr5z" _uuid="00000000-0000-0000-5E0A-879C2C325D47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-45jq~eg7z-wr5z"><intent_id>558556</intent_id><project_id>706088</project_id><text_data>Customer #27358, Contract #'s 33844,33845,33846,33847,33848,33849,33850</text_data><comment_date>2013-03-05T00:00:00</comment_date></row><row _id="row-49h3.z3fn.7zar" _uuid="00000000-0000-0000-9839-79603F3017B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49h3.z3fn.7zar"><intent_id>528777</intent_id><project_id>688239</project_id><text_data>Filed by Angela Mellen</text_data><comment_date>2012-08-15T00:00:00</comment_date></row><row _id="row-s3rx-ibvx-evhp" _uuid="00000000-0000-0000-7C2E-D78CD5A3EB02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s3rx-ibvx-evhp"><intent_id>1050891</intent_id><project_id>915436</project_id><text_data>Weatherization, apartment, 2, no, no, no, no,no,no,no,no,no,no,no,no,no, yes, yes, yes, no</text_data><comment_date>2020-04-10T00:00:00</comment_date></row><row _id="row-huen-f6ee~xtfe" _uuid="00000000-0000-0000-E856-94887E8CAD77" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-huen-f6ee~xtfe"><intent_id>550304</intent_id><project_id>681304</project_id><text_data>I went back and put in the Registration number for Valley and also the UBI number again and it takes it out.  I don't know what else to do.</text_data><comment_date>2013-01-08T00:00:00</comment_date></row><row _id="row-pntc_urkh~cvg9" _uuid="00000000-0000-0000-7B93-3F768A513AC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pntc_urkh~cvg9"><intent_id>536394</intent_id><project_id>692026</project_id><text_data>Fringe Breakout: $0.47 Holiday, $3.71 Medical, $0.70 Vacation, $15.61 Pension</text_data><comment_date>2012-10-22T00:00:00</comment_date></row><row _id="row-52dg.qznj~e4kq" _uuid="00000000-0000-0000-CD77-AA7AB36B67C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-52dg.qznj~e4kq"><intent_id>1118344</intent_id><project_id>948322</project_id><comment_date>2021-01-27T00:00:00</comment_date></row><row _id="row-papp.8x8a_8kps" _uuid="00000000-0000-0000-2C24-AD1C43A1BF6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-papp.8x8a_8kps"><intent_id>1117067</intent_id><project_id>945667</project_id><text_data>Russell Landscaping is responsible for installing sprinkler system to accommodate new landscaping using trencher not exceeding 12' depth. Installing 72 yards of top soil to accommodate new grades and plant material. Installing commercial grade weed fabric in all landscaping areas. Installing Medium wood bark mulch 3' depth in all landscaping areas excluding swale area. Install 4' angular rock in bottom of swale area</text_data><comment_date>2021-01-22T00:00:00</comment_date></row><row _id="row-29t7-ajf5.gqtf" _uuid="00000000-0000-0000-2C7D-FAEFEFDB4B13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-29t7-ajf5.gqtf"><intent_id>723547</intent_id><project_id>773566</project_id><text_data>PotholingMotorPatrol Grader to vacuum hole for new pole</text_data><comment_date>2015-09-29T00:00:00</comment_date></row><row _id="row-qdri.k45r-6twv" _uuid="00000000-0000-0000-6E39-9C5029C996AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qdri.k45r-6twv"><intent_id>1028800</intent_id><project_id>895830</project_id><text_data>Job 2381547  FY-2019-0315$1.84 PTOFringe Benefits:$9.24 Health &amp; Welfare$5.55 Pension$2.00 IAP$0.08 Occup. Hazard$0.10 International Training Fund$1.15 Apprenticeship, Industry Fund, LMCT_____$18.12</text_data><comment_date>2019-12-27T00:00:00</comment_date></row><row _id="row-ym4r.xvta-y5nu" _uuid="00000000-0000-0000-DDC8-7E9A620D422A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ym4r.xvta-y5nu"><intent_id>582483</intent_id><project_id>713630</project_id><text_data>Form Filed By; Fawn Boone-Herzer</text_data><comment_date>2013-07-22T00:00:00</comment_date></row><row _id="row-p59h-35js_5u79" _uuid="00000000-0000-0000-CDA5-02820CD95E12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p59h-35js_5u79"><intent_id>458908</intent_id><project_id>665428</project_id><text_data>Transport of refined aggregate</text_data><comment_date>2011-06-10T00:00:00</comment_date></row><row _id="row-uvpx~6idy~y64b" _uuid="00000000-0000-0000-C970-8ED1EC92C706" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uvpx~6idy~y64b"><intent_id>689365</intent_id><project_id>758478</project_id><text_data>Fringe will be paid in cash on check,  Installing low voltage cabling and outlets</text_data><comment_date>2015-04-16T00:00:00</comment_date></row><row _id="row-t8u8_4s48_xcaa" _uuid="00000000-0000-0000-8379-01F51CE8D6DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t8u8_4s48_xcaa"><intent_id>955528</intent_id><project_id>870979</project_id><text_data>KCDA</text_data><comment_date>2019-01-16T00:00:00</comment_date></row><row _id="row-bjns.k3ai-gkqt" _uuid="00000000-0000-0000-6660-F43968A3B2E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjns.k3ai-gkqt"><intent_id>678765</intent_id><project_id>727033</project_id><text_data>This Intent needs to replaced intent #677562 due to an incorrectly entered hiring contractor.</text_data><comment_date>2015-02-11T00:00:00</comment_date></row><row _id="row-emy3-sf5i-qfz8" _uuid="00000000-0000-0000-8541-8DB8E68346DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-emy3-sf5i-qfz8"><intent_id>495244</intent_id><project_id>680664</project_id><text_data>Prairie Electric, Inc.�s fringe packages only include Health Plan, Vacation Plan, Holiday Plan, Pension Plan, and Apprentice Program.</text_data><comment_date>2011-12-30T00:00:00</comment_date></row><row _id="row-p9dz-6ze5~rxyi" _uuid="00000000-0000-0000-EE70-D32ECC7215D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p9dz-6ze5~rxyi"><intent_id>669300</intent_id><project_id>750510</project_id><text_data>Disconnect old guard shack, reconnect in new location running new fiber. (114-5591)</text_data><comment_date>2014-12-10T00:00:00</comment_date></row><row _id="row-s5a7.qr55_dxsm" _uuid="00000000-0000-0000-E916-767716BE76B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s5a7.qr55_dxsm"><intent_id>987079</intent_id><project_id>885384</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2019-06-24T00:00:00</comment_date></row><row _id="row-fswf~rytk_7an9" _uuid="00000000-0000-0000-E174-2217412E3B37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fswf~rytk_7an9"><intent_id>553208</intent_id><project_id>692735</project_id><text_data>Track Surfacing and Striping</text_data><comment_date>2013-01-23T00:00:00</comment_date></row><row _id="row-ei37~825s~323u" _uuid="00000000-0000-0000-A93D-03650E1EFDDE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ei37~825s~323u"><intent_id>674492</intent_id><project_id>753516</project_id><text_data>PRIMARILY ONLY THE OWNER WILL BE DOING ALL PW WORK. HOWEVER, WE MAY CALL IN AN ELIGIBLE EMPLOYEE FOR EMERGENCIES ONLY.</text_data><comment_date>2015-01-14T00:00:00</comment_date></row><row _id="row-gpbt-mya2.bj73" _uuid="00000000-0000-0000-EE3E-4233EC87862E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gpbt-mya2.bj73"><intent_id>813965</intent_id><project_id>812549</project_id><text_data>NSC Job# 148704101</text_data><comment_date>2017-02-01T00:00:00</comment_date></row><row _id="row-b2sv~dsw4_448k" _uuid="00000000-0000-0000-EFE6-D1A51A78799E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b2sv~dsw4_448k"><intent_id>1419038</intent_id><project_id>1120085</project_id><text_data>9940716</text_data><comment_date>2024-04-13T00:00:00</comment_date></row><row _id="row-s3hh~qzr9_rhbv" _uuid="00000000-0000-0000-BA88-3B39C62588EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s3hh~qzr9_rhbv"><intent_id>911853</intent_id><project_id>852350</project_id><text_data>Job #115422-001 &amp; 002 related to job #201506-004</text_data><comment_date>2018-06-18T00:00:00</comment_date></row><row _id="row-nswi.jr9i_tpd8" _uuid="00000000-0000-0000-AFF9-0BBBEE386400" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nswi.jr9i_tpd8"><intent_id>1016203</intent_id><project_id>896524</project_id><text_data>1.  Repair a water leak by the meter vault.   Excavate next to meter box to expose broken water pipe section. Repair pipe and backfill.2. Single Family3.14. a- no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no5. yes6. yes7. no8. no</text_data><comment_date>2019-10-17T00:00:00</comment_date></row><row _id="row-q9t2.5b4v.yva6" _uuid="00000000-0000-0000-6888-B989F33DD26B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9t2.5b4v.yva6"><intent_id>1128824</intent_id><project_id>954281</project_id><text_data>Installation of Cantilever, Selective and Bar Stock rack. Basic handtools.</text_data><comment_date>2021-03-24T00:00:00</comment_date></row><row _id="row-yndy.5xtq.b7ej" _uuid="00000000-0000-0000-5055-B6C0E3DE62C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yndy.5xtq.b7ej"><intent_id>1468030</intent_id><project_id>1139161</project_id><text_data>This job only included ONE vessel, not TWO, as previously reported by the Prime Contractor. The other vessel was gone before they could return to salvage it.</text_data><comment_date>2024-09-18T00:00:00</comment_date></row><row _id="row-said.wwap-8qij" _uuid="00000000-0000-0000-F910-14DB925D7A61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-said.wwap-8qij"><intent_id>1057427</intent_id><project_id>918712</project_id><text_data>This is an irrigation project connecting into existing systems adding new irrigation clock modules in the city of Seattle, King County.  Tools to be used will include shovels, hand tools, and back pack blower for clean up.</text_data><comment_date>2020-05-12T00:00:00</comment_date></row><row _id="row-prtj-ibkn_a2qs" _uuid="00000000-0000-0000-B567-36702056B964" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prtj-ibkn_a2qs"><intent_id>1181181</intent_id><project_id>981238</project_id><text_data>9871254</text_data><comment_date>2021-09-28T00:00:00</comment_date></row><row _id="row-mxcj_kxrv_smdt" _uuid="00000000-0000-0000-9759-824CF988A0B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mxcj_kxrv_smdt"><intent_id>1248710</intent_id><project_id>649039</project_id><text_data>All work was subcontracted out to Pape Machinery. No work was performed by United Rental.</text_data><comment_date>2022-10-18T00:00:00</comment_date></row><row _id="row-uyqh.fi56-tfuk" _uuid="00000000-0000-0000-70D8-17BB17F1951C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uyqh.fi56-tfuk"><intent_id>1199073</intent_id><project_id>991635</project_id><text_data>Install of new cabinets and wall repair	ApartmentsTwo storiesNo to all a.-i.Yes YesYesNo</text_data><comment_date>2021-12-14T00:00:00</comment_date></row><row _id="row-snc6~rqfh~zi39" _uuid="00000000-0000-0000-2C9B-3186C47494E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-snc6~rqfh~zi39"><intent_id>1149155</intent_id><project_id>957410</project_id><text_data>Our job # 21-0101</text_data><comment_date>2021-06-02T00:00:00</comment_date></row><row _id="row-r4wr_9utq~z8d9" _uuid="00000000-0000-0000-A8D6-D97A3CF944E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r4wr_9utq~z8d9"><intent_id>1057546</intent_id><project_id>893997</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2020-05-12T00:00:00</comment_date></row><row _id="row-mugg_7dim-2i72" _uuid="00000000-0000-0000-E884-2656BAF632F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mugg_7dim-2i72"><intent_id>910750</intent_id><project_id>816336</project_id><text_data>Filed by Tim Walker</text_data><comment_date>2018-06-12T00:00:00</comment_date></row><row _id="row-fpmr~ydwz.xfg2" _uuid="00000000-0000-0000-B5A7-C018A41F0705" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fpmr~ydwz.xfg2"><intent_id>1267682</intent_id><project_id>1031627</project_id><text_data>Found leak in the syphon breaker, took syphon breaker off, put red tape on the fitting, rebuilt syphon breaker and put on a new drive belt. Tools used: Screw Driver and battery powered drill with bit to remove panel.</text_data><comment_date>2022-09-19T00:00:00</comment_date></row><row _id="row-e9d3-5pk5-i839" _uuid="00000000-0000-0000-E911-F44C776EFB7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e9d3-5pk5-i839"><intent_id>930775</intent_id><project_id>860668</project_id><text_data>Filed by Scott Kurtzman</text_data><comment_date>2018-09-05T00:00:00</comment_date></row><row _id="row-73ey~paiv~pns4" _uuid="00000000-0000-0000-F9B1-66A18537ECE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73ey~paiv~pns4"><intent_id>708040</intent_id><project_id>767609</project_id><text_data>Tank delivery to T5, periodic cleaning,and emptyingSemi to deliver baker tank to siteMotorPatrol Grader to empty and clean tank when necessary</text_data><comment_date>2015-07-17T00:00:00</comment_date></row><row _id="row-pjcc~7dqd-px66" _uuid="00000000-0000-0000-AE50-4415FC8637C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjcc~7dqd-px66"><intent_id>1083373</intent_id><project_id>919773</project_id><text_data>WRS Job #M20-572PW5Truck Drivers - Other Trucks will be used for water truck</text_data><comment_date>2020-08-26T00:00:00</comment_date></row><row _id="row-wn3m_zzaa_xwxb" _uuid="00000000-0000-0000-6988-384A1A0C6F01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wn3m_zzaa_xwxb"><intent_id>474373</intent_id><project_id>616070</project_id><text_data>Work to be performed will be installation of sod.  Equipment to be used will be 25 hp sod installers.</text_data><comment_date>2011-08-25T00:00:00</comment_date></row><row _id="row-yheu-2uqt.hrn7" _uuid="00000000-0000-0000-5999-76210E355F0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yheu-2uqt.hrn7"><intent_id>1281681</intent_id><project_id>1039712</project_id><text_data>REMOVED SHOWER PAN AND CONCRETE TO LOCATE BURST PIPE.</text_data><comment_date>2022-12-09T00:00:00</comment_date></row><row _id="row-7h5s.u8cv.ac6z" _uuid="00000000-0000-0000-4368-52EC0D6D60D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7h5s.u8cv.ac6z"><intent_id>511708</intent_id><project_id>687590</project_id><text_data>REMOVE AND REPLACE 2 LIGHT POSTS AT A 3 STORY APARTMENT COMPLEX. NO BASETMENT OR GARAGE, PERMANENT RESIDENCE ONLY, NO REHAB, NO TRANSITIONAL HOUSING, NO COMMUNAL DINING, NO TREATMENT, NO COUNSELING, EACH UNIT HAS THEIR OWN KITCHEN AND BATH, MANAGERS OFFICE ON SITE, NO PUBLIC US,</text_data><comment_date>2012-05-14T00:00:00</comment_date></row><row _id="row-bksu-4az8.tfa3" _uuid="00000000-0000-0000-0ECA-EAB14B171828" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bksu-4az8.tfa3"><intent_id>756774</intent_id><project_id>789626</project_id><text_data>DATA CABLING- COMPUTER CABLES</text_data><comment_date>2016-04-18T00:00:00</comment_date></row><row _id="row-sqdj.znkj_jwk4" _uuid="00000000-0000-0000-F881-E622F20C951D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqdj.znkj_jwk4"><intent_id>699078</intent_id><project_id>761738</project_id><text_data>installing landscape and irrigation system   using shovels rakes, bobcat skidsteer loader,   digging no deeper that 18 inches  spread soil 8 inches and bark 2 inches</text_data><comment_date>2015-06-08T00:00:00</comment_date></row><row _id="row-3rfa-xnc7.6iir" _uuid="00000000-0000-0000-698F-59A82755A415" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3rfa-xnc7.6iir"><intent_id>770615</intent_id><project_id>794656</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2016-06-24T00:00:00</comment_date></row><row _id="row-mzem~5dec_6sri" _uuid="00000000-0000-0000-DF77-D17BF309CE34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mzem~5dec_6sri"><intent_id>714495</intent_id><project_id>769977</project_id><text_data>**Other Trucks - 4,000 gallon water truck</text_data><comment_date>2015-08-14T00:00:00</comment_date></row><row _id="row-y32a~uqhm-wk4p" _uuid="00000000-0000-0000-D71C-093775CDFD3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y32a~uqhm-wk4p"><intent_id>681514</intent_id><project_id>727605</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following Crafts/trades/occupations:</text_data><comment_date>2015-03-02T00:00:00</comment_date></row><row _id="row-tksr-ij3v.3dk9" _uuid="00000000-0000-0000-D4F5-E83D998A0B43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tksr-ij3v.3dk9"><intent_id>711205</intent_id><project_id>768777</project_id><text_data>MMFS Job#73156467</text_data><comment_date>2015-07-30T00:00:00</comment_date></row><row _id="row-2myn-xr8p.xugy" _uuid="00000000-0000-0000-E1A6-7EF8A0785412" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2myn-xr8p.xugy"><intent_id>479478</intent_id><project_id>674903</project_id><text_data>Landscaping will include installation of irrigation system valve boxes and irrigation pipes for paver areas. Work will also include removing trees and planting trees, removing top soil and spreading top soil. Tools used will be shovels, rakes, and handsaw. Equipment used will be mini-excavator, tree chipper and ground compactor.</text_data><comment_date>2011-10-12T00:00:00</comment_date></row><row _id="row-6s3y_vcwq_gkwz" _uuid="00000000-0000-0000-DF28-62F0C3222B3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6s3y_vcwq_gkwz"><intent_id>1080286</intent_id><project_id>919275</project_id><text_data>Transport  modular building</text_data><comment_date>2020-08-13T00:00:00</comment_date></row><row _id="row-yf6g-ahpv.9zek" _uuid="00000000-0000-0000-334D-4BA5C7EC4D6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yf6g-ahpv.9zek"><intent_id>664608</intent_id><project_id>748362</project_id><text_data>In order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2- Single Family3-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- nok- no6- no7- no8- noMeridee Kortan11717 19th Ave NE</text_data><comment_date>2014-11-07T00:00:00</comment_date></row><row _id="row-k6ks-bx8b_sn88" _uuid="00000000-0000-0000-5C76-626C6CF1875D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k6ks-bx8b_sn88"><intent_id>890638</intent_id><project_id>844813</project_id><text_data>Filing intent per CN, SRO 460267 &amp; 460220.</text_data><comment_date>2018-03-01T00:00:00</comment_date></row><row _id="row-8r6w-2teg.rwhw" _uuid="00000000-0000-0000-DB22-9435359ECC94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8r6w-2teg.rwhw"><intent_id>1138449</intent_id><project_id>959586</project_id><text_data>The project is to remove and replace a generator, concrete pad, CMU infill, water line relocationPrater Electric will be removing an existing generator, installing a concrete pad, installing a generator, electrical.The laborer we be working on demo, hand excavation, concrete, backfill.</text_data><comment_date>2021-04-28T00:00:00</comment_date></row><row _id="row-dpvq~cttv~89ve" _uuid="00000000-0000-0000-B8CC-D32FC3066A27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpvq~cttv~89ve"><intent_id>556142</intent_id><project_id>693398</project_id><text_data>Mt West Polymers employees are residence of IDAHO and are overed by ID State Fund insurance.</text_data><comment_date>2013-02-14T00:00:00</comment_date></row><row _id="row-f6vf-n7j9-2d3e" _uuid="00000000-0000-0000-76E0-AC979361C5CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f6vf-n7j9-2d3e"><intent_id>1269883</intent_id><project_id>944739</project_id><text_data>1210046 - Imagine Children's Museum</text_data><comment_date>2022-09-27T00:00:00</comment_date></row><row _id="row-dx94-8qma.566j" _uuid="00000000-0000-0000-CCA2-CF45C3408DF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dx94-8qma.566j"><intent_id>688442</intent_id><project_id>759704</project_id><text_data>Install of Projector in Peninsula HS Theater</text_data><comment_date>2015-04-10T00:00:00</comment_date></row><row _id="row-b9sv~7er8.5yij" _uuid="00000000-0000-0000-DDC9-033C66E23EF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9sv~7er8.5yij"><intent_id>1111583</intent_id><project_id>916315</project_id><text_data>Replaces Intent ID 1050860 due to clerical error</text_data><comment_date>2020-12-22T00:00:00</comment_date></row><row _id="row-3qnu-uyn4-dww8" _uuid="00000000-0000-0000-D03B-7A1B100C4489" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3qnu-uyn4-dww8"><intent_id>893859</intent_id><project_id>840505</project_id><text_data>1) Replace kitchen sink/faucet &amp; underplumbing. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f) No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) Yes - manager office. 8) No.</text_data><comment_date>2018-03-20T00:00:00</comment_date></row><row _id="row-imb8.gseg_aggs" _uuid="00000000-0000-0000-3836-C42B2C331741" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imb8.gseg_aggs"><intent_id>604138</intent_id><project_id>723770</project_id><text_data>Power Equipment used: VacuumsHand tools used: brooms, spray bottles, squigees, towels, and various cleaning supplies.</text_data><comment_date>2013-11-18T00:00:00</comment_date></row><row _id="row-axkm~qzcv.es4e" _uuid="00000000-0000-0000-A10D-7701DCE740CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-axkm~qzcv.es4e"><intent_id>1461303</intent_id><project_id>1083501</project_id><text_data>Truck driver operates a 400-600 gallon fuel truck used to fuel up helicopters on jobsites.</text_data><comment_date>2024-09-20T00:00:00</comment_date></row><row _id="row-eg94~pnhp_26s7" _uuid="00000000-0000-0000-E814-AB5839419346" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eg94~pnhp_26s7"><intent_id>1469438</intent_id><project_id>1144515</project_id><text_data># of workers may change.</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-9rmm-p6q9.vqni" _uuid="00000000-0000-0000-2BB4-F94B1C469D32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9rmm-p6q9.vqni"><intent_id>1459683</intent_id><project_id>1141425</project_id><text_data>This is a landscape maintenance contract. We will be using lawnmowers, weedeaters, backpack blowers, handtools including pruners, loppers, rakes. We will be mowing lawns, raking beds, picking up garbage and minor pruning to shrubs and trees. Maintaining landscape irrigation</text_data><comment_date>2024-08-23T00:00:00</comment_date></row><row _id="row-aspg_ekj9-6qvv" _uuid="00000000-0000-0000-3F30-50F3C6D43DFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aspg_ekj9-6qvv"><intent_id>1119693</intent_id><project_id>949072</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Repair Bath Fan#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? single family#3 - Including any basement or garage, how many stories or levels does the structure have?`#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure?no(b) Any retail use in the structure?no(c) Permanent residence only?yes(d) Rehabilitation house?no(e) Transitional housing?no(f) Communal dining facility?no(g) Treatment services?no(h) Assisted living services?no(i) Dormitories?no(j) Counseling?no(k) Is each room and/or bed in the structure rented separately?no(l) Other services or uses?no#5 - Does each dwelling unit have its own self-contained kitchen?yes#6 - Does each dwelling unit have its own bathroom?yes#7 - Is there a community facility or manager�s office on site?no#8 - Is any part of the structure used by members of the public?no</text_data><comment_date>2021-02-09T00:00:00</comment_date></row><row _id="row-rr3v-6b4s_kdg3" _uuid="00000000-0000-0000-4398-117A93EC5279" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rr3v-6b4s_kdg3"><intent_id>1084498</intent_id><project_id>930977</project_id><text_data>303349</text_data><comment_date>2020-08-31T00:00:00</comment_date></row><row _id="row-cerf.dfu4.mbnw" _uuid="00000000-0000-0000-D324-0B8E2C693F64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cerf.dfu4.mbnw"><intent_id>500528</intent_id><project_id>682780</project_id><text_data>Added power equipment operator for skid steer loader operation per correction notice request. Added flagger to direct traffic when equipment enters and or leaves work site.</text_data><comment_date>2012-03-05T00:00:00</comment_date></row><row _id="row-54d3-rmqe_nfcs" _uuid="00000000-0000-0000-2A07-516C36E0AD59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-54d3-rmqe_nfcs"><intent_id>1207204</intent_id><project_id>996939</project_id><text_data>301FCJ045B (W1062701, W1024532, W1114839, W950319)</text_data><comment_date>2022-01-26T00:00:00</comment_date></row><row _id="row-yr2v_rqm6.y7v3" _uuid="00000000-0000-0000-0BC4-2E93986B5569" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yr2v_rqm6.y7v3"><intent_id>819626</intent_id><project_id>812386</project_id><text_data>Other Truck - Water Truck for Dust Control only - 4000 gals</text_data><comment_date>2017-03-08T00:00:00</comment_date></row><row _id="row-3erj-bbp5~zgdw" _uuid="00000000-0000-0000-ABEE-3988EF1D1CE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3erj-bbp5~zgdw"><intent_id>757942</intent_id><project_id>790167</project_id><text_data>Filed by Jim Nicholl</text_data><comment_date>2016-04-21T00:00:00</comment_date></row><row _id="row-m7e5_w99t~my85" _uuid="00000000-0000-0000-C14D-240FC223EB60" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7e5_w99t~my85"><intent_id>988634</intent_id><project_id>885966</project_id><text_data>Haz Waste workers to clear area of all debris and clean oil spill using shovels/rakes/sorbent pads</text_data><comment_date>2019-07-01T00:00:00</comment_date></row><row _id="row-6neb_2psr-y3yf" _uuid="00000000-0000-0000-9A0C-6E2F30B9A51B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6neb_2psr-y3yf"><intent_id>814524</intent_id><project_id>807037</project_id><text_data>Filed by Gary Claytt</text_data><comment_date>2017-02-04T00:00:00</comment_date></row><row _id="row-6f9u.mirn.arz9" _uuid="00000000-0000-0000-D527-765111F2FCA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6f9u.mirn.arz9"><intent_id>954000</intent_id><project_id>870208</project_id><text_data>WRS Job #P19-019PWTrade: Truck Drivers Occupation: Other Trucks may be used for Mobing equipment</text_data><comment_date>2019-01-08T00:00:00</comment_date></row><row _id="row-nbvj~4ya5~69d7" _uuid="00000000-0000-0000-E470-25E507EE5B29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nbvj~4ya5~69d7"><intent_id>1011869</intent_id><project_id>893246</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2019-10-03T00:00:00</comment_date></row><row _id="row-6xxz_agpb~7ze2" _uuid="00000000-0000-0000-9AFE-1E25903169CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xxz_agpb~7ze2"><intent_id>1103359</intent_id><project_id>917339</project_id><text_data>cleaning and moving tiles</text_data><comment_date>2020-11-13T00:00:00</comment_date></row><row _id="row-tr6q~38m3-2nkc" _uuid="00000000-0000-0000-89E9-8198FFEE76DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tr6q~38m3-2nkc"><intent_id>766384</intent_id><project_id>793703</project_id><text_data>Blythe job # T-306</text_data><comment_date>2016-06-06T00:00:00</comment_date></row><row _id="row-kyrt-66eu_ytcu" _uuid="00000000-0000-0000-BF76-D28586AF2BBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kyrt-66eu_ytcu"><intent_id>622216</intent_id><project_id>731847</project_id><text_data>Job # 204869</text_data><comment_date>2014-03-27T00:00:00</comment_date></row><row _id="row-htym_zurg.vfzr" _uuid="00000000-0000-0000-F8CC-5A0153806F55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-htym_zurg.vfzr"><intent_id>588641</intent_id><project_id>718119</project_id><text_data>Form Filed By: Todd Michael Douglas</text_data><comment_date>2013-08-20T00:00:00</comment_date></row><row _id="row-5qzi_3n7r.5pw6" _uuid="00000000-0000-0000-A80A-C75FA36408F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5qzi_3n7r.5pw6"><intent_id>931191</intent_id><project_id>860828</project_id><text_data>Job #203004-002</text_data><comment_date>2018-09-07T00:00:00</comment_date></row><row _id="row-h4vt_8rnm-kin7" _uuid="00000000-0000-0000-2AEE-19007D730CB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h4vt_8rnm-kin7"><intent_id>687397</intent_id><project_id>731826</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 23 CFR 965.101. Workers will be paid in accordance with Davis-bacon wage requirements for the following Crafts/Trades/Occupations</text_data><comment_date>2015-04-03T00:00:00</comment_date></row><row _id="row-2s5y.zcr8~nbsm" _uuid="00000000-0000-0000-4058-16F4833A7517" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2s5y.zcr8~nbsm"><intent_id>1069896</intent_id><project_id>923646</project_id><text_data>Please describe your part(s) of the project: Uretek uses our patented Uretek 486 to fill voids.Please specifically describe the duties being performed by the General Laborer: Profile lanes of the roadway. Using small portable electric drills, drill injection holes (size of a penny) on 4' center.</text_data><comment_date>2020-07-06T00:00:00</comment_date></row><row _id="row-n6qa-xj9a_rf9s" _uuid="00000000-0000-0000-1565-38300E0FF47A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n6qa-xj9a_rf9s"><intent_id>676063</intent_id><project_id>754298</project_id><text_data>We are the only company working on this project. Our part is to change filters on HVAC units. Ladders needed to access some units.</text_data><comment_date>2015-01-23T00:00:00</comment_date></row><row _id="row-wp3j~j7c6_aeag" _uuid="00000000-0000-0000-6E57-150494405213" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wp3j~j7c6_aeag"><intent_id>1005732</intent_id><project_id>892676</project_id><text_data>Project # 117993-001</text_data><comment_date>2019-09-09T00:00:00</comment_date></row><row _id="row-3457~syj8_6kna" _uuid="00000000-0000-0000-CF0B-C16148FDDCA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3457~syj8_6kna"><intent_id>537275</intent_id><project_id>696935</project_id><text_data>intent for 09/01/11-08/31/12</text_data><comment_date>2012-10-03T00:00:00</comment_date></row><row _id="row-wq4d-9ty9-u3yz" _uuid="00000000-0000-0000-D53C-B128ABEE9942" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wq4d-9ty9-u3yz"><intent_id>863891</intent_id><project_id>833022</project_id><text_data>MMFS Job#73176718</text_data><comment_date>2017-09-20T00:00:00</comment_date></row><row _id="row-q8af_wgtb_ncm3" _uuid="00000000-0000-0000-E112-9A17F54CC810" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8af_wgtb_ncm3"><intent_id>647225</intent_id><project_id>738591</project_id><text_data>Form filed by: Olga Korosteleva</text_data><comment_date>2014-08-12T00:00:00</comment_date></row><row _id="row-puhn_b79m_hep5" _uuid="00000000-0000-0000-64A1-913C17082261" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-puhn_b79m_hep5"><intent_id>516716</intent_id><project_id>689522</project_id><text_data>Approximately 250 goats will be used at the substation to help manage the blackberries and English ivy on the slope above the substation. An electric fence will be installed at the base of the slope to prevent the goats from getting into the substation.</text_data><comment_date>2012-06-13T00:00:00</comment_date></row><row _id="row-5k2b-qhqx-q8z8" _uuid="00000000-0000-0000-E3DD-5F83B4C5EB50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5k2b-qhqx-q8z8"><intent_id>508048</intent_id><project_id>678554</project_id><text_data>Sent e-mail 04/06/2012: Intent and Affidavit forms submitted with a bid due date up until April 9, 2012, will be approved with the wage and fringe benefit amounts claimed by your firm if it meets or exceeds the required prevailing rate of wage. However, after that date your firm may no longer utilize the fringe benefit guidance dated May 9, 1989, in which the amount paid into the plan is divided by the total number of hours worked on the public works project. All claimed fringe benefits must be calculated on the annualized figure of 2,080 as provided in my December 22, 2011, and December 28, 2011, e-mails to your firm and workers must be compensated based upon this calculation method. Pending forms held for fringe benefit review will be approved today.To reiterate: The amount of credit that may be taken for a fringe benefit must be calculated on an annual (yearly) basis. That means that an employer determines the total amount that will be contributed for the year for the benefit such as vacation pay or holiday pay and that total contribution figure for the calendar year must be divided by 2,080 to arrive at the hourly fringe benefit credit. The employee is to receive that total contribution figure in the calendar year or upon termination of employment.</text_data><comment_date>2012-04-23T00:00:00</comment_date></row><row _id="row-zgpk~vwn5~99ey" _uuid="00000000-0000-0000-1808-4BF72B0E892F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zgpk~vwn5~99ey"><intent_id>1021608</intent_id><project_id>886012</project_id><text_data>FOX will be planting trees not exceeding 24' in height, shrubs not exceeding 18' in height and live stakes 3' long and 1-2' wide. Fox will also be placing bark mulch around the plantings with the purpose of protecting the plants and beautification.</text_data><comment_date>2020-01-09T00:00:00</comment_date></row><row _id="row-mq83-h82a~xrdk" _uuid="00000000-0000-0000-634F-5131E45AEF9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mq83-h82a~xrdk"><intent_id>591091</intent_id><project_id>718992</project_id><text_data>OTHER TRUCKS = WATER TRUCK FOR DUST CONTROL AND COMPACTION</text_data><comment_date>2013-08-30T00:00:00</comment_date></row><row _id="row-h93j.88ey~tg2e" _uuid="00000000-0000-0000-FC65-AECA8640516D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h93j.88ey~tg2e"><intent_id>1261991</intent_id><project_id>1025630</project_id><text_data>22-80-162The other truck will be a lowboy tractor trailer used to haul heavy equipment to and from the project location.</text_data><comment_date>2022-08-29T00:00:00</comment_date></row><row _id="row-tppj.e9nn~b2gw" _uuid="00000000-0000-0000-E03B-8603228C81DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tppj.e9nn~b2gw"><intent_id>618103</intent_id><project_id>729953</project_id><text_data>PC -6</text_data><comment_date>2014-02-28T00:00:00</comment_date></row><row _id="row-sayr.p57i.74us" _uuid="00000000-0000-0000-09DA-CB98F0DDA73B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sayr.p57i.74us"><intent_id>1286201</intent_id><project_id>1036964</project_id><text_data>Fringe:$8.98 Security$10.10 retirement$.89 Appreticeship $.12 CITF</text_data><comment_date>2022-11-28T00:00:00</comment_date></row><row _id="row-jr5v-5fb5_7gy7" _uuid="00000000-0000-0000-82E4-EEF0D5923A16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jr5v-5fb5_7gy7"><intent_id>729126</intent_id><project_id>771696</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2015-10-30T00:00:00</comment_date></row><row _id="row-kse4_qtmq_36sd" _uuid="00000000-0000-0000-E36C-B68799FD8B85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kse4_qtmq_36sd"><intent_id>810751</intent_id><project_id>807638</project_id><text_data>Filed by James Thielman.</text_data><comment_date>2017-01-11T00:00:00</comment_date></row><row _id="row-7rwp~75ka_42qs" _uuid="00000000-0000-0000-BB36-8014FA6B61DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7rwp~75ka_42qs"><intent_id>738885</intent_id><project_id>781367</project_id><text_data>Filed by Vic Dell</text_data><comment_date>2015-12-22T00:00:00</comment_date></row><row _id="row-ukpb.aag7-fac9" _uuid="00000000-0000-0000-A964-D8765C25930F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ukpb.aag7-fac9"><intent_id>289740</intent_id><project_id>566703</project_id><text_data>Note:  Changed to specific address/property from Mulitiple addresses - each site to have it's own intent &amp; affidavits - using this intent to file for Craigmont.</text_data><comment_date>2011-04-11T00:00:00</comment_date></row><row _id="row-iu8z~mcn8~h7a6" _uuid="00000000-0000-0000-7E7D-1CD69CBB09F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iu8z~mcn8~h7a6"><intent_id>1454565</intent_id><project_id>1138862</project_id><text_data>Public note added per customer request: � Correct job site address is 342 SW 16th St, Chehalis, WA 98532�</text_data><comment_date>2025-02-10T00:00:00</comment_date></row><row _id="row-cuqz~xfct_8f3b" _uuid="00000000-0000-0000-DC61-091E2399AF97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cuqz~xfct_8f3b"><intent_id>1036414</intent_id><project_id>899452</project_id><text_data>Our duties for this project will be to bring playground material in our truck to the facility where everything will be marked and ready for the Swanson employee(s) and possibly an additional hired subcontractor (landscape maintenance) to take a hose and blow the product on the playground where they tell us. No other tools, etc. will be used. Truck = KENWORTH T-800 4 axle Trailer = IMCO live floor trailer 48� this truck will be used to deliver Engineered Wood Fiber (a type of Playground Chip). Material will be delivered using our blower trailer to blow material into designated areas specified by the Prime Contractor. We may hire a subcontractor to complete the landscape construction portion, to take a hose and blow the product on the playground where they tell us. No other tools, etc. are used.</text_data><comment_date>2020-02-05T00:00:00</comment_date></row><row _id="row-2nib-c27p_asm4" _uuid="00000000-0000-0000-6982-7B8605EE1AC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2nib-c27p_asm4"><intent_id>1166862</intent_id><project_id>964670</project_id><text_data>Herbicide application by truck or gator with roadside sprayer to base rock in preparation for paving. Controls are in vehicle so that the driver sprays while the vehicle moves.</text_data><comment_date>2021-08-06T00:00:00</comment_date></row><row _id="row-zhvf~qdnr_j4di" _uuid="00000000-0000-0000-DC4E-5F5187191973" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhvf~qdnr_j4di"><intent_id>1099689</intent_id><project_id>938114</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.</text_data><comment_date>2020-10-29T00:00:00</comment_date></row><row _id="row-st9c.skd6_by8p" _uuid="00000000-0000-0000-4A3B-AFF55CF19752" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-st9c.skd6_by8p"><intent_id>598437</intent_id><project_id>719930</project_id><text_data>Filed by John Schneider.</text_data><comment_date>2013-10-09T00:00:00</comment_date></row><row _id="row-7ah9_f59z~4t6g" _uuid="00000000-0000-0000-0BE5-F144F22AB212" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ah9_f59z~4t6g"><intent_id>1219780</intent_id><project_id>1004874</project_id><text_data>#1-We were contracted to REPLACE the furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2022-03-22T00:00:00</comment_date></row><row _id="row-dqvq-wnhq.2gej" _uuid="00000000-0000-0000-2321-22388BBB0548" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dqvq-wnhq.2gej"><intent_id>458847</intent_id><project_id>606957</project_id><text_data>Semi flatbed truck and fladtbed trailer (105,500 GVW)with articulating boom. Purpose, to deliver and set Concrete Barrier.</text_data><comment_date>2011-06-13T00:00:00</comment_date></row><row _id="row-wzq4-ds2h~bqin" _uuid="00000000-0000-0000-6828-5F973A04468C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wzq4-ds2h~bqin"><intent_id>1133050</intent_id><project_id>954860</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site. General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2021-04-01T00:00:00</comment_date></row><row _id="row-rtqm.8r6g~2ska" _uuid="00000000-0000-0000-5750-A115432DB393" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rtqm.8r6g~2ska"><intent_id>747247</intent_id><project_id>785322</project_id><text_data>Job # 8010245</text_data><comment_date>2016-02-18T00:00:00</comment_date></row><row _id="row-wgj6-pk7p~jhr3" _uuid="00000000-0000-0000-B5F6-50AFEB484B84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wgj6-pk7p~jhr3"><intent_id>1199013</intent_id><project_id>991604</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement:On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-01-07T00:00:00</comment_date></row><row _id="row-pkgu_93gy.2s32" _uuid="00000000-0000-0000-8549-0C202805581E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pkgu_93gy.2s32"><intent_id>752015</intent_id><project_id>774527</project_id><text_data>The fiber is used for bits and bytes, LAN, Telephone and Data.</text_data><comment_date>2016-03-18T00:00:00</comment_date></row><row _id="row-wavi.cadr-a6r6" _uuid="00000000-0000-0000-6ABE-924ED6664C6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wavi.cadr-a6r6"><intent_id>1166992</intent_id><project_id>974018</project_id><text_data>Our customer hired us to supply, deliver, and install bark and/or mulch to a depth of 2 to 4 inches. The laborers assist the truck driver by dragging hoses to the designated installation area and using backpack blowers to guide material into place and for cleanup of material over spray.</text_data><comment_date>2021-08-06T00:00:00</comment_date></row><row _id="row-raea-79ix-x3ge" _uuid="00000000-0000-0000-5CDC-5903A95985E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-raea-79ix-x3ge"><intent_id>832462</intent_id><project_id>817554</project_id><text_data>We do not know the entire scope of this project as we are only performing the erosion control portion. Our laborers use hand tools like picks, shovels, and post pounders to install temporary erosion and sediment control products.</text_data><comment_date>2017-05-11T00:00:00</comment_date></row><row _id="row-x5ms_9xki-kru7" _uuid="00000000-0000-0000-5D1E-62247777E441" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x5ms_9xki-kru7"><intent_id>991706</intent_id><project_id>887148</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2019-07-15T00:00:00</comment_date></row><row _id="row-etss.mf74_jevx" _uuid="00000000-0000-0000-4688-3239E6CD0AEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-etss.mf74_jevx"><intent_id>1130212</intent_id><project_id>955070</project_id><text_data>183-130-01</text_data><comment_date>2021-03-19T00:00:00</comment_date></row><row _id="row-d4uv-88vv.aui2" _uuid="00000000-0000-0000-104E-CE528A0F6A8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4uv-88vv.aui2"><intent_id>952332</intent_id><project_id>869417</project_id><text_data>Discovered this of two (other is Feeder #2781) was never entered when work started back in year 2017 as part of the same contract for the 5-year (now 6th year) SCL&amp;#39;s Powerline Clearance Program.</text_data><comment_date>2018-12-26T00:00:00</comment_date></row><row _id="row-5bat~wid7~njfz" _uuid="00000000-0000-0000-9AAD-C8615AD91F9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bat~wid7~njfz"><intent_id>931963</intent_id><project_id>861113</project_id><text_data>Contact:Tom Harris, Director of Facilitiestharris@qsd.wednet.eduTia Stoddard, Business Office Managertstoddar@qsd.wednet.edu</text_data><comment_date>2018-09-11T00:00:00</comment_date></row><row _id="row-dnv9_xcz3.af7b" _uuid="00000000-0000-0000-2353-689DEDC7BAC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dnv9_xcz3.af7b"><intent_id>519078</intent_id><project_id>667931</project_id><text_data>please note - this is a federal davis bacon prevailing wage rate project - the wage rate &amp; fringe are reflective of federal wage determination WA2010079 (mod no 17), WA2010098 (mod no 7) on Project/Contract no 10-6410021 - classification is Telecommunications Tech I</text_data><comment_date>2012-06-26T00:00:00</comment_date></row><row _id="row-kjuu-tp4d-mc67" _uuid="00000000-0000-0000-E56B-B5FFA6016EA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kjuu-tp4d-mc67"><intent_id>592122</intent_id><project_id>719393</project_id><text_data>The furnaces and ductwork that we will be replacing are in single family resiidences, this is not an apartment complex. Some homes are 2 story townhouses and others are flats. There is no commercial or retail use, rehabilitation, tranisitional or communal dinig, treatment services. Homes are rented by the house not individual rooms, each have their own self contained kitchen with no community center nor or any of the structures used by members of the public.</text_data><comment_date>2013-09-12T00:00:00</comment_date></row><row _id="row-cfef~s6va~69wt" _uuid="00000000-0000-0000-E730-8E90EF8F9B8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cfef~s6va~69wt"><intent_id>783826</intent_id><project_id>744439</project_id><text_data>The total project is the construction of a building for Pierce County Readiness Center.  Our portion of the work is to supply and install quartz counter tops for restroom areas.  The tools needed would be hand held grinders for minor tops adjustments.  The tops are secured to the existing frames by silicone.  We will bring the tops to the job site on our vehicles</text_data><comment_date>2016-08-30T00:00:00</comment_date></row><row _id="row-i83s_fswv~zaqk" _uuid="00000000-0000-0000-CA1C-7147C32ED115" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i83s_fswv~zaqk"><intent_id>974031</intent_id><project_id>876182</project_id><text_data>Filed by Robin RomansACI # 19-012</text_data><comment_date>2019-04-25T00:00:00</comment_date></row><row _id="row-ec28~ssy5-eway" _uuid="00000000-0000-0000-833D-2E18A88D1511" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ec28~ssy5-eway"><intent_id>791375</intent_id><project_id>803247</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 6 for voice (telephone) and data (computer networking ) indoors  Physical location:  2020 Cornwall Ave, Bellingham, WA 98225</text_data><comment_date>2016-09-23T00:00:00</comment_date></row><row _id="row-t9gt.qdat_q2ew" _uuid="00000000-0000-0000-85ED-D6352493F0DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9gt.qdat_q2ew"><intent_id>474283</intent_id><project_id>668140</project_id><text_data>Federal Project</text_data><comment_date>2011-08-24T00:00:00</comment_date></row><row _id="row-i32p.jrht_nhhz" _uuid="00000000-0000-0000-498D-0EB885D0A556" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i32p.jrht_nhhz"><intent_id>586869</intent_id><project_id>717469</project_id><text_data>Prairie Electric, Inc.�s fringe packages only include Health Plan, Vacation Plan, Holiday Plan, Pension Plan, and Apprentice Program.</text_data><comment_date>2013-08-09T00:00:00</comment_date></row><row _id="row-hkdt-vmew-n9x9" _uuid="00000000-0000-0000-2A1A-CC7382FA7894" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hkdt-vmew-n9x9"><intent_id>937270</intent_id><project_id>859268</project_id><text_data>Diane Membrere-Lopez is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be repairing flooring in the bathroom. This job meets the residential job requirements.</text_data><comment_date>2018-10-03T00:00:00</comment_date></row><row _id="row-k7wm-9eay~hkmt" _uuid="00000000-0000-0000-85DA-5EC6577DF720" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7wm-9eay~hkmt"><intent_id>1015614</intent_id><project_id>896272</project_id><text_data>1) Leak repair. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f) No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) No. 8) No.</text_data><comment_date>2019-10-15T00:00:00</comment_date></row><row _id="row-ixvf.p5hq.c228" _uuid="00000000-0000-0000-41A4-B395B79128C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ixvf.p5hq.c228"><intent_id>457667</intent_id><project_id>666846</project_id><text_data>Irrigation lines will be installed in order to irrigate a native tree and shrub planting previously installed. The system will be run using our tanker truck and a small gas powered pump, hooked up to installed the irrgation line.</text_data><comment_date>2011-05-26T00:00:00</comment_date></row><row _id="row-5xhj.89i6_gf6i" _uuid="00000000-0000-0000-8363-3A7451C4E7BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5xhj.89i6_gf6i"><intent_id>826823</intent_id><project_id>818226</project_id><text_data>not all libraries will have the same employees together</text_data><comment_date>2017-04-16T00:00:00</comment_date></row><row _id="row-dyfk-hpuq~t2ij" _uuid="00000000-0000-0000-4222-6A42E726298D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dyfk-hpuq~t2ij"><intent_id>599164</intent_id><project_id>704364</project_id><text_data>Salish Networks, Inc. is a Tribal Government Corporation and is wholly owned by the Tulalip Tribes of Washington, a federally recognized Tribe.  The Tulalip Tribes are exempt from State Workers Compensation Insurance Requirements.  All workers covered under Tribal First Insurance.Staff will be installing fiber optic cabling for traffic signs.  All work will be done outside.</text_data><comment_date>2013-10-14T00:00:00</comment_date></row><row _id="row-ii6m-h7wq_qmet" _uuid="00000000-0000-0000-6812-2AC5E4CFED43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ii6m-h7wq_qmet"><intent_id>1026923</intent_id><project_id>880252</project_id><text_data>FILED BY RITA NIELSEN</text_data><comment_date>2019-12-13T00:00:00</comment_date></row><row _id="row-cvg8.rw4a.g74s" _uuid="00000000-0000-0000-E54D-232630B7C67E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cvg8.rw4a.g74s"><intent_id>1044789</intent_id><project_id>822014</project_id><text_data>Job 19-1936</text_data><comment_date>2020-03-11T00:00:00</comment_date></row><row _id="row-m7yg~dptx-k2zk" _uuid="00000000-0000-0000-B91E-9A1415F0DC35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7yg~dptx-k2zk"><intent_id>1020676</intent_id><project_id>896966</project_id><text_data>#1 - Replace existing geothermal package unit HP/AH#2 - Apartments#3 - 2#4 - a and b - no, c - yes, d through l - no#5 - yes#6 - Yes#7 - yes#8 - no</text_data><comment_date>2019-11-08T00:00:00</comment_date></row><row _id="row-hxrp~97b4_yvcv" _uuid="00000000-0000-0000-2DA2-6973004EE992" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxrp~97b4_yvcv"><intent_id>747955</intent_id><project_id>785678</project_id><text_data>1. Install a ductless heat pump2. Single Family3. 1 Story4.a. No, B. No, C. Yes, D. No, E. No, F. No, G. NO, H. No, I. No, J. No, K. none5. No6. No7. No8. No</text_data><comment_date>2016-02-23T00:00:00</comment_date></row><row _id="row-7y34_uicb~kam3" _uuid="00000000-0000-0000-8980-A02FE82FBB8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7y34_uicb~kam3"><intent_id>1009818</intent_id><project_id>894289</project_id><text_data>#20646, Williams, Greg, 3701 N Ella Rd., Spokane Valley</text_data><comment_date>2019-10-16T00:00:00</comment_date></row><row _id="row-7k2n.xnme-xm4d" _uuid="00000000-0000-0000-CFE9-588D27E2D318" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7k2n.xnme-xm4d"><intent_id>930200</intent_id><project_id>860425</project_id><text_data>&amp;quot;POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)&amp;quot; USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2018-09-03T00:00:00</comment_date></row><row _id="row-7tdc~c4cu~av4z" _uuid="00000000-0000-0000-0AF9-AA872BFA95F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7tdc~c4cu~av4z"><intent_id>853400</intent_id><project_id>820846</project_id><text_data>640 S grand drreplace 40 gallon low boy electric water heaterremove and replace 1 1/2 cast iron p-trap install new 1 1/2 abs p trapnot known- not known- no no yes no no no no no no no no no no</text_data><comment_date>2017-08-08T00:00:00</comment_date></row><row _id="row-7rnm.m8my~amyb" _uuid="00000000-0000-0000-08E2-BD09ADCF6EB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7rnm.m8my~amyb"><intent_id>653501</intent_id><project_id>742942</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-09-17T00:00:00</comment_date></row><row _id="row-t3a7_fj88.aifk" _uuid="00000000-0000-0000-D079-A65843C32005" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3a7_fj88.aifk"><intent_id>643947</intent_id><project_id>740346</project_id><text_data>The work consists of digging containment hole and exporting material, installing geotextile fabric, installing membrane and x-tex, installation of drain rock and covering with existing switch yard rock for a Spill Prevention Control and Countermeasures Containment Substation. One of our lead employees will roto hammer out existing footings, then wrap the x-tex fabric around pressure treated 2x4's which they will then adhere to existing concrete using rebar pins. The excavation sub will backfill once done.</text_data><comment_date>2014-07-30T00:00:00</comment_date></row><row _id="row-yvtx_s6ui.h88r" _uuid="00000000-0000-0000-102A-FC147B3D603D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yvtx_s6ui.h88r"><intent_id>1081906</intent_id><project_id>915942</project_id><text_data>MMFS Job#76205078</text_data><comment_date>2020-08-20T00:00:00</comment_date></row><row _id="row-y9qr~whac.gdqu" _uuid="00000000-0000-0000-6728-5FE85BE38DB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y9qr~whac.gdqu"><intent_id>515096</intent_id><project_id>685271</project_id><text_data>&amp;quot;Project is Exempt from state prevailing wage requirements based on the The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations&amp;quot;</text_data><comment_date>2012-06-05T00:00:00</comment_date></row><row _id="row-fun3_4y6u.dng8" _uuid="00000000-0000-0000-6922-FDC61BCC7D2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fun3_4y6u.dng8"><intent_id>995617</intent_id><project_id>888675</project_id><text_data>Crescent Harbor Elementary School</text_data><comment_date>2019-07-30T00:00:00</comment_date></row><row _id="row-h6qh-dzsh_n5za" _uuid="00000000-0000-0000-61B7-2CF1CA2F7BC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h6qh-dzsh_n5za"><intent_id>969007</intent_id><project_id>877316</project_id><text_data>ALL COUNTIESGeneral labor work consists of hand work (shovel work) no power equipment or power tools Blade operator is used for grading for compaction before paving operations. other trucks consist of the following: 1) 0-8,000 gallon water truck used for watering the project site to help with compaction $35.68(base) + $8.92(fringe) 2) oil distributor used for distribution of oil during chip sealing operations - $37.93(base) + $9.48(fringe)</text_data><comment_date>2019-04-02T00:00:00</comment_date></row><row _id="row-3uvg-b4um_jx5j" _uuid="00000000-0000-0000-640C-B8E7FA041D19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3uvg-b4um_jx5j"><intent_id>609958</intent_id><project_id>726238</project_id><text_data>Inside LAN (Telecom Tech 09) and Outdoor LAN (Electronic Tech (06) - Steward Elementary School Portable Relocation.  We are the sub to Madsen Electric</text_data><comment_date>2013-12-27T00:00:00</comment_date></row><row _id="row-2brq_6agd-fmy8" _uuid="00000000-0000-0000-DCE0-A7AD45D8DC0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2brq_6agd-fmy8"><intent_id>1222572</intent_id><project_id>1006601</project_id><text_data>INV # 88666115 SR # 51752690</text_data><comment_date>2022-04-01T00:00:00</comment_date></row><row _id="row-znii~fer6-q6fk" _uuid="00000000-0000-0000-9696-F8F6546934DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-znii~fer6-q6fk"><intent_id>664241</intent_id><project_id>748240</project_id><text_data>Preventive Maintenance School Year 2014-2015Period 09/01/2014-08/31/2015Multiple Locations</text_data><comment_date>2014-11-05T00:00:00</comment_date></row><row _id="row-ruc4_353w_fuyr" _uuid="00000000-0000-0000-7F1E-4BD37C1D10B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ruc4_353w_fuyr"><intent_id>740344</intent_id><project_id>782087</project_id><text_data>Blythe Service W/O 76871^</text_data><comment_date>2016-01-06T00:00:00</comment_date></row><row _id="row-ixzq_hy6v-8p9e" _uuid="00000000-0000-0000-3402-DEE003E19827" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ixzq_hy6v-8p9e"><intent_id>1104453</intent_id><project_id>932019</project_id><text_data>Labor and materials for installation of Low Voltage Telecommunications cabling for access control.</text_data><comment_date>2020-11-18T00:00:00</comment_date></row><row _id="row-69tf~ttgg.a4qk" _uuid="00000000-0000-0000-0560-2F9AF8081BE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-69tf~ttgg.a4qk"><intent_id>575744</intent_id><project_id>709612</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2013-06-17T00:00:00</comment_date></row><row _id="row-ivkj~5gth-j3hv" _uuid="00000000-0000-0000-ACFA-41F54C731F23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ivkj~5gth-j3hv"><intent_id>1199164</intent_id><project_id>991700</project_id><text_data>1.     Wx work. 2. Y 3. 1 4. residence a.n b. n c. y d.n e. n f. n g. n h. n i. n j. n k. n l. n 5. y 6. y 7. n 8 n</text_data><comment_date>2021-12-14T00:00:00</comment_date></row><row _id="row-u66c.gewj-ay4y" _uuid="00000000-0000-0000-CF60-E04473A66753" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u66c.gewj-ay4y"><intent_id>1245825</intent_id><project_id>1016266</project_id><text_data>1122098</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-rcs9_tvie-nn8z" _uuid="00000000-0000-0000-DE87-8AE1C124BA30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rcs9_tvie-nn8z"><intent_id>1132546</intent_id><project_id>956344</project_id><text_data>Order 90437</text_data><comment_date>2021-03-30T00:00:00</comment_date></row><row _id="row-kqfz-zg3s_qugs" _uuid="00000000-0000-0000-3389-FEAADAF15B4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kqfz-zg3s_qugs"><intent_id>962020</intent_id><project_id>874061</project_id><text_data>Lincoln St., 104, Bellingham, WA, 982291. Air seal, attic blow, duct seal, crawl, belly blow, mechanical ventilation		2. Single family		3. 1		4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No		5. Yes		6. Yes		7. No		8. No</text_data><comment_date>2019-02-25T00:00:00</comment_date></row><row _id="row-ucx3~2ar8-nnjj" _uuid="00000000-0000-0000-F2E9-C50901F45ACD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ucx3~2ar8-nnjj"><intent_id>573872</intent_id><project_id>712719</project_id><text_data>Telecom Tech (09)  Install 70&amp;quot; LED TV work will be performed indoors</text_data><comment_date>2013-06-07T00:00:00</comment_date></row><row _id="row-nprq.yfd6.7qjp" _uuid="00000000-0000-0000-4DE6-3DC6CB66F650" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nprq.yfd6.7qjp"><intent_id>1205615</intent_id><project_id>992580</project_id><text_data>E247 2022-287 G (1) GOLENDALE</text_data><comment_date>2022-01-19T00:00:00</comment_date></row><row _id="row-5apu_6mfa.7pfg" _uuid="00000000-0000-0000-FA7E-A77F9245B068" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5apu_6mfa.7pfg"><intent_id>1068062</intent_id><project_id>919519</project_id><text_data>Truck:  Year 2005, GMC, Model - C7500, Style - Straight, Gross Weight - 26,000</text_data><comment_date>2020-06-25T00:00:00</comment_date></row><row _id="row-b8cq-677g-5gjp" _uuid="00000000-0000-0000-6900-06445A52F7FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b8cq-677g-5gjp"><intent_id>877621</intent_id><project_id>829249</project_id><text_data>Filed by Linnie Shaver</text_data><comment_date>2017-12-05T00:00:00</comment_date></row><row _id="row-psf3~3g3n_9fw5" _uuid="00000000-0000-0000-3648-42BE004DFE5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-psf3~3g3n_9fw5"><intent_id>1416776</intent_id><project_id>1113432</project_id><text_data>SR55617798 invoice 51433563</text_data><comment_date>2024-04-05T00:00:00</comment_date></row><row _id="row-chdw-x8yn_54hi" _uuid="00000000-0000-0000-8D37-69448F799CE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-chdw-x8yn_54hi"><intent_id>732174</intent_id><project_id>776125</project_id><text_data>The duties to be performed by the General Laborer are: Wall removal, carpet and flooring removal. The tools to be used by the general laborer are: hammers, burke bars, flat bars, crow bars.</text_data><comment_date>2015-11-18T00:00:00</comment_date></row><row _id="row-sqbg.kam6_b8uf" _uuid="00000000-0000-0000-864C-A3BADD438FC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqbg.kam6_b8uf"><intent_id>861229</intent_id><project_id>829879</project_id><text_data>E Layer Installation</text_data><comment_date>2017-09-07T00:00:00</comment_date></row><row _id="row-ym6d_86ve-57j6" _uuid="00000000-0000-0000-2E99-146C9B74CFAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ym6d_86ve-57j6"><intent_id>609935</intent_id><project_id>726329</project_id><text_data>LR - 12/27/2013JOB # 901-16 INV. 1079521, 1079020</text_data><comment_date>2013-12-27T00:00:00</comment_date></row><row _id="row-wv9h.bebs-ayyi" _uuid="00000000-0000-0000-05B6-0D41D163593B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wv9h.bebs-ayyi"><intent_id>826512</intent_id><project_id>818094</project_id><text_data>In order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2- Single Family3-1-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- nok- no6- no7- no8- noRonald &amp; Linda Frazier 3736 S Brandon</text_data><comment_date>2017-04-13T00:00:00</comment_date></row><row _id="row-7488-fvhb~dtnv" _uuid="00000000-0000-0000-A649-2F271E3CC4E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7488-fvhb~dtnv"><intent_id>874937</intent_id><project_id>837518</project_id><text_data>Kcda</text_data><comment_date>2017-11-15T00:00:00</comment_date></row><row _id="row-vwh2~e3vt.x942" _uuid="00000000-0000-0000-604A-D43EE771E8EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vwh2~e3vt.x942"><intent_id>937112</intent_id><project_id>863021</project_id><text_data>Jaime Villeda is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be replacing the existing gas furnace. This job meets the residential job requirements.</text_data><comment_date>2018-10-02T00:00:00</comment_date></row><row _id="row-4xcp-wtsn-tpi5" _uuid="00000000-0000-0000-5FCA-4F23C18F6ADB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4xcp-wtsn-tpi5"><intent_id>1239038</intent_id><project_id>1016373</project_id><text_data>WRI Job # 22.025</text_data><comment_date>2022-06-06T00:00:00</comment_date></row><row _id="row-nwjj_hwrp-x8in" _uuid="00000000-0000-0000-523A-93742F6746E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nwjj_hwrp-x8in"><intent_id>479126</intent_id><project_id>674787</project_id><text_data>I needed to confirm about the use of the tractor and I am adding a correction: in talking with the project manager about the size of the tractor, he said it would be a 35hp tractor to pull a screen attached to the back of the tractor to disperse the infield conditioner on the softball fields, not to push the warning track sand into place.  The warning track sand will all be done using shovel and rake. The smaller tractor in the previous notes would not be accurate and will not be used.</text_data><comment_date>2011-10-10T00:00:00</comment_date></row><row _id="row-s7j9.rynw-xt94" _uuid="00000000-0000-0000-0AFF-83173D9C9750" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s7j9.rynw-xt94"><intent_id>1286651</intent_id><project_id>1042750</project_id><text_data>MMFS - 73223974</text_data><comment_date>2022-11-30T00:00:00</comment_date></row><row _id="row-8bmn_ihty_xrji" _uuid="00000000-0000-0000-7DE7-01F7583AD526" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8bmn_ihty_xrji"><intent_id>1122736</intent_id><project_id>950769</project_id><text_data>1. Weatherize Home2.Single Family Dwelling3.One Level4. a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no l.no5. yes6.yes7.no8.no</text_data><comment_date>2021-02-16T00:00:00</comment_date></row><row _id="row-mpgp-6zp4_dnf9" _uuid="00000000-0000-0000-BF7F-FC7B5F0E74DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpgp-6zp4_dnf9"><intent_id>530246</intent_id><project_id>693523</project_id><text_data>The work we did was on 7/25/2012 (We did demo on maple).</text_data><comment_date>2012-09-24T00:00:00</comment_date></row><row _id="row-megf~uykt_66xw" _uuid="00000000-0000-0000-6742-0E6376B0C843" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-megf~uykt_66xw"><intent_id>791230</intent_id><project_id>763163</project_id><text_data>A.) RemodelB.)  Our Part is to provide Hydronic Equipment/Material,(1-Pot Feeder for heating system, 1-Glycol feeder for chilled system, Provide testing equipment and service trips.) pick up water samples and send them to the lab for Coliform Bacteria Anaylysis, system start up and trainingc.) Water sample bottles, owners manual, driving a 2009 GMC to job site</text_data><comment_date>2016-09-28T00:00:00</comment_date></row><row _id="row-y5nt.h7xi-seyx" _uuid="00000000-0000-0000-9EA4-AB9BEA6D4FA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5nt.h7xi-seyx"><intent_id>995151</intent_id><project_id>881143</project_id><text_data>Furnish materials and perform installation</text_data><comment_date>2019-07-28T00:00:00</comment_date></row><row _id="row-put2_7n5i~it3y" _uuid="00000000-0000-0000-133C-9B610A93A7C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-put2_7n5i~it3y"><intent_id>1073400</intent_id><project_id>890401</project_id><text_data>LEROY NEWTON HIRED US</text_data><comment_date>2020-07-20T00:00:00</comment_date></row><row _id="row-8g7e-nmpc.xe6s" _uuid="00000000-0000-0000-07CD-7B35570AC78B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8g7e-nmpc.xe6s"><intent_id>720686</intent_id><project_id>772378</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION BUNDLE OF 20 JOBS. THEY ARE ALL SINGLE FAMILY RESIDENTIAL DWELLINGS.1. 802 N 40TH AVE #322. 401 SCHUT RD #49, MOXEE3. 2615 S 62ND AVE, YAKIMA4. 1401 S 15TH AVE, YAKIMA5. 107 E AHTANUM RD #7, UNION GAP6. 1301 E SPRUCE ST, YAKIMA7. 614 N 5TH AVE, YAKIMA</text_data><comment_date>2015-09-15T00:00:00</comment_date></row><row _id="row-8acp.tdbm_7u3m" _uuid="00000000-0000-0000-D517-ABF00CB30BF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8acp.tdbm_7u3m"><intent_id>1180066</intent_id><project_id>980608</project_id><text_data>93107 FRANKLIN CC WALK IN COOLER</text_data><comment_date>2021-09-23T00:00:00</comment_date></row><row _id="row-2t75_4auy.mfe4" _uuid="00000000-0000-0000-2724-E80187E7D94C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2t75_4auy.mfe4"><intent_id>901975</intent_id><project_id>787647</project_id><text_data>-- On 2/22/2017:--Subcontract: Crystal Soda Blast LLC | UBI Number: 602 888 492 | Contractor Registration Number: CRYSTSB910JW�Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.� Laborers: Group 2</text_data><comment_date>2018-05-01T00:00:00</comment_date></row><row _id="row-8vmq~pqpp-dycd" _uuid="00000000-0000-0000-8A09-8969DD2FA659" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8vmq~pqpp-dycd"><intent_id>977788</intent_id><project_id>881109</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2019-05-14T00:00:00</comment_date></row><row _id="row-u5ey~2s8v.e2kz" _uuid="00000000-0000-0000-711C-E56F7A909789" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u5ey~2s8v.e2kz"><intent_id>1027363</intent_id><project_id>902255</project_id><text_data>BIU</text_data><comment_date>2019-12-17T00:00:00</comment_date></row><row _id="row-a7zq_2jim.uvd3" _uuid="00000000-0000-0000-5F47-FAD53EEEEFC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7zq_2jim.uvd3"><intent_id>1060598</intent_id><project_id>920222</project_id><text_data>Haz Waste workers to take samples from site  using hand spade and buckets</text_data><comment_date>2020-05-27T00:00:00</comment_date></row><row _id="row-ca5u~y9wh-6brn" _uuid="00000000-0000-0000-C9DA-89CA67BDFE73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ca5u~y9wh-6brn"><intent_id>538126</intent_id><project_id>697222</project_id><text_data>WIM JOB 10005</text_data><comment_date>2012-10-04T00:00:00</comment_date></row><row _id="row-aina.sws3-4t5a" _uuid="00000000-0000-0000-2A87-165EA7CBFB59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aina.sws3-4t5a"><intent_id>521944</intent_id><project_id>678119</project_id><text_data>From: Barbara Clark [mailto:BarbaraC@kcha.org] Sent: Wednesday, December 12, 2012 2:19 PMTo: Murphy, Justine D (LNI)Cc: 'dcrosby@cdkconstruction.com'Subject: FW: Intent Davis-Bacon Verbiage Justine, Please add the verbiage/statement below to the following contractor �Statement of Intents and Affidavits� in the �Public Notes� section: Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations. Firwood Circle � Area Services CenterGodfrey Enterprises - 521944</text_data><comment_date>2012-12-20T00:00:00</comment_date></row><row _id="row-bbm2-2a5f~tv23" _uuid="00000000-0000-0000-7905-1DC503568B7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bbm2-2a5f~tv23"><intent_id>691607</intent_id><project_id>761028</project_id><text_data>Service Call 150216-0013</text_data><comment_date>2015-04-29T00:00:00</comment_date></row><row _id="row-6ak4-4rqz_m43e" _uuid="00000000-0000-0000-E55F-68E6B3EBDC67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ak4-4rqz_m43e"><intent_id>1111844</intent_id><project_id>930245</project_id><text_data>$15.43 medical, $7.71 dental, $3.85 vacation, $3.85 holiday$17.18 medical, $8.59 dental, $4.29 vacation, $4.29 holiday</text_data><comment_date>2021-01-22T00:00:00</comment_date></row><row _id="row-pa6u-c4xv-cj66" _uuid="00000000-0000-0000-F769-17B91401D395" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pa6u-c4xv-cj66"><intent_id>1006695</intent_id><project_id>893073</project_id><text_data>33124</text_data><comment_date>2019-09-12T00:00:00</comment_date></row><row _id="row-ztci~zrtm~ki6m" _uuid="00000000-0000-0000-4809-2FC46F04D18A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ztci~zrtm~ki6m"><intent_id>1141693</intent_id><project_id>958893</project_id><text_data>1008534 - MC connection to new power supply</text_data><comment_date>2021-05-04T00:00:00</comment_date></row><row _id="row-vi2j-vuzt-2k8h" _uuid="00000000-0000-0000-03A0-13DCD9BC48D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vi2j-vuzt-2k8h"><intent_id>563370</intent_id><project_id>708287</project_id><text_data>Other trucks - Water Truck 0-8,000 gallon used for dust control.</text_data><comment_date>2013-04-11T00:00:00</comment_date></row><row _id="row-64ba_8b6v.mexg" _uuid="00000000-0000-0000-0873-EB176A6CF101" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-64ba_8b6v.mexg"><intent_id>846222</intent_id><project_id>826644</project_id><text_data>ALLQ46431</text_data><comment_date>2017-07-10T00:00:00</comment_date></row><row _id="row-9uys~jv27_2aap" _uuid="00000000-0000-0000-7943-0AD260DD6B55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9uys~jv27_2aap"><intent_id>703551</intent_id><project_id>761800</project_id><text_data>Form filed by: Deborah R. Hernandez</text_data><comment_date>2015-06-25T00:00:00</comment_date></row><row _id="row-z4e4.j6sq-9eek" _uuid="00000000-0000-0000-97F4-5ED69A6BFE7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z4e4.j6sq-9eek"><intent_id>1093607</intent_id><project_id>914933</project_id><text_data>Other Truck - Water Truck Other Truck - Lowboy Heavy Duty Trailer</text_data><comment_date>2020-10-06T00:00:00</comment_date></row><row _id="row-fs3p-yfgw~avup" _uuid="00000000-0000-0000-6FD2-0CD179E8C5B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fs3p-yfgw~avup"><intent_id>659314</intent_id><project_id>736939</project_id><text_data>To the best of my knowledge, the scope of the entire project is site improvements, including the construction of a new play field.  The scope of our work is to hydraulically place grass seed, fertilizer and mulch using a Finn T60 trailer mounted hydro-seeder, to seed the new playing field grass, and to seed lawn new areas around the school.</text_data><comment_date>2014-10-09T00:00:00</comment_date></row><row _id="row-7dh9~tf8v_33nq" _uuid="00000000-0000-0000-BC6B-7080A39558D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7dh9~tf8v_33nq"><intent_id>548651</intent_id><project_id>697263</project_id><text_data>Other Truck:  He drives a tractor and hauls 40-48 ft trash trailers out of rabanco disposal facility to the project. When the trailers get full he picks them up and hauls them back to the disposal site and returns an empty to the site.</text_data><comment_date>2012-12-18T00:00:00</comment_date></row><row _id="row-weqy-9jdm_mrnw" _uuid="00000000-0000-0000-7038-57FA69785FAF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-weqy-9jdm_mrnw"><intent_id>511281</intent_id><project_id>686286</project_id><text_data>MATERIAL SUPPLIER ONLYTRUCK TYPE: TR (AS LISTED ON OUR WASHINGTON REGISTRATION CAB CARD)TRUCK SIZE: GROSS WEIGHT OR COMBINED GROSS WEIGHT 80,000 (AS LISTED ON OUR WASHINGTON REGISTRATION CAB CARD)PURPOSE OF TRUCK OPERATED: TO DELIVER OUR MATERIAL TO THE JOBSITE; FABRICATED STRUCTURAL STEEL DELIVERIESSMALLER DELIVERIES ARE MADE USING A FORD F350 AND FLATBED TRAILER</text_data><comment_date>2012-05-10T00:00:00</comment_date></row><row _id="row-d9bt~g8bs_7yc7" _uuid="00000000-0000-0000-5FC4-89892E067344" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d9bt~g8bs_7yc7"><intent_id>800334</intent_id><project_id>806743</project_id><text_data>1-Attic insulation-2-single family dwelling 3-2 story 4-A-NO B-NO C-YES D-NO E-NO F-NO G-NO H-NO I-NO J-NO K-NO 5-yes 6-yes 7-no 8-no</text_data><comment_date>2016-11-08T00:00:00</comment_date></row><row _id="row-j7zp_6sq4~c9d7" _uuid="00000000-0000-0000-3F92-C695B2B6DD38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j7zp_6sq4~c9d7"><intent_id>651975</intent_id><project_id>743391</project_id><text_data>I think the Industrial Insurance Account # is 146,423-00  PAC number is 81013651</text_data><comment_date>2014-09-03T00:00:00</comment_date></row><row _id="row-q9r5.sb5e~jqes" _uuid="00000000-0000-0000-5987-CE57A7810C35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9r5.sb5e~jqes"><intent_id>908014</intent_id><project_id>852123</project_id><text_data>(1)INSULATION (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO, B-NO, C-YES, D-NO, E-NO, F-NO, G-NO, H-NO, I-NO, J-NO, K-? (5)YES (6)YES (7)NO (8)NO</text_data><comment_date>2018-05-31T00:00:00</comment_date></row><row _id="row-df68-ihyd-acw7" _uuid="00000000-0000-0000-1C73-3826AFBE5B39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-df68-ihyd-acw7"><intent_id>899833</intent_id><project_id>809340</project_id><text_data>Semi-Tractor with Trailer.  Trailer is a 100 cy container.</text_data><comment_date>2018-04-20T00:00:00</comment_date></row><row _id="row-cy52~9axq.id42" _uuid="00000000-0000-0000-F15B-C6C67B46CF9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cy52~9axq.id42"><intent_id>1024354</intent_id><project_id>875093</project_id><text_data>project is exempt form state prevailing wage requirements based on the housing Act of 1937 and 24 CFR 965.101 in the notes sections</text_data><comment_date>2019-11-29T00:00:00</comment_date></row><row _id="row-wu7g.frhr.ica4" _uuid="00000000-0000-0000-7D88-86DB1308E86A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wu7g.frhr.ica4"><intent_id>792837</intent_id><project_id>803778</project_id><text_data>General Laborer consists of hand work (no power tools or equipment) $28.27 base + $7.87 pensionMotor patrol graders consists of Paving Operators and Blade Operators $45.55 base + $11.39 pensionOther trucks consists of Water Truck ( 0 to 8,000 gallons) used to help with the grading process and dust control $32.46 base + $8.12 pension</text_data><comment_date>2016-09-29T00:00:00</comment_date></row><row _id="row-5ens-xt8v~s6ex" _uuid="00000000-0000-0000-92F7-A3CB1777AF15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ens-xt8v~s6ex"><intent_id>690000</intent_id><project_id>758359</project_id><text_data>Manufature performed in Snohomish County, Everett. Install performed in Pierce County, Tacoma</text_data><comment_date>2015-04-20T00:00:00</comment_date></row><row _id="row-xa3a_et3k-3yqb" _uuid="00000000-0000-0000-14C9-9D45DC898781" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xa3a_et3k-3yqb"><intent_id>957237</intent_id><project_id>840001</project_id><text_data>Filed by Charles H Grouns</text_data><comment_date>2019-01-28T00:00:00</comment_date></row><row _id="row-z7rb.6xyz.9m29" _uuid="00000000-0000-0000-8D37-62A5536235B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7rb.6xyz.9m29"><intent_id>546017</intent_id><project_id>665657</project_id><text_data>truck driver</text_data><comment_date>2012-11-30T00:00:00</comment_date></row><row _id="row-3xg3.xaym_m8wx" _uuid="00000000-0000-0000-0717-7E5143C8ADC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3xg3.xaym_m8wx"><intent_id>651711</intent_id><project_id>743290</project_id><text_data>Job # 166774</text_data><comment_date>2014-09-01T00:00:00</comment_date></row><row _id="row-9rrm_dsg9_pmj7" _uuid="00000000-0000-0000-9DE6-66F4B71065C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9rrm_dsg9_pmj7"><intent_id>840424</intent_id><project_id>789224</project_id><text_data>I have listed above the hiring contractor name and information.  There is not another way to edit the information other than to enter in the notes sections as indicated.</text_data><comment_date>2017-06-22T00:00:00</comment_date></row><row _id="row-sdxx~3i65_auzp" _uuid="00000000-0000-0000-DD88-ABDB96AF8A95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sdxx~3i65_auzp"><intent_id>1273909</intent_id><project_id>1034935</project_id><text_data>SC220929-0142</text_data><comment_date>2022-10-11T00:00:00</comment_date></row><row _id="row-8bn3~x7r8.8jie" _uuid="00000000-0000-0000-225C-5EFAE1961BF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8bn3~x7r8.8jie"><intent_id>703570</intent_id><project_id>758750</project_id><text_data>PLEASE DISREGARD THE NOTE ABOVE</text_data><comment_date>2015-07-09T00:00:00</comment_date></row><row _id="row-ewvm.qhem-dtw2" _uuid="00000000-0000-0000-D566-8230F5D3AA88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ewvm.qhem-dtw2"><intent_id>462800</intent_id><project_id>666643</project_id><text_data>Industrial insurance account in Washington is not required if we are there on a temporary basis. We have Oregon Workers Comp and Stop Gap liability.</text_data><comment_date>2011-06-27T00:00:00</comment_date></row><row _id="row-7ejp~czwh~hamv" _uuid="00000000-0000-0000-231A-44CD1E564362" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ejp~czwh~hamv"><intent_id>886090</intent_id><project_id>839965</project_id><text_data>Project is exempt from the State prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2018-01-31T00:00:00</comment_date></row><row _id="row-skhk_5grw.e62g" _uuid="00000000-0000-0000-CC6E-8B80C02C2F05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-skhk_5grw.e62g"><intent_id>523362</intent_id><project_id>691974</project_id><text_data>Residentail Rate Questions. 1.The structure is a Apartment residentail structure. 2. The structures are 1&amp;2 stories. 3. What is the facility used for, a.permanent residence only?-Yes.  b.rehabilitation house?-NOc.transitional housing?-NO. d.communal dining facility?-No. e.treatment services?-No. f.counseling?-No.g.other?-No.  4.Does each dwelling unit have its own self-contained kitchen?- Yes.  5.Does each dwelling unit have its own bathroom?- Yes.  6.Is there a community facility or managers office on site?- Yes.  7.Is any part of the facility used by members of the public?- No</text_data><comment_date>2012-07-23T00:00:00</comment_date></row><row _id="row-favj_sq5m~vwex" _uuid="00000000-0000-0000-1945-F27AB6DE64C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-favj_sq5m~vwex"><intent_id>767826</intent_id><project_id>794267</project_id><text_data>SFR Weatehrization work.  SFR. 2, no, no, Yes, no, no, no, no, no, no, no.  No.  No.  No.  No.</text_data><comment_date>2016-06-13T00:00:00</comment_date></row><row _id="row-8wd3-6e9h~8t3d" _uuid="00000000-0000-0000-C22C-A782081E126F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8wd3-6e9h~8t3d"><intent_id>571774</intent_id><project_id>711902</project_id><text_data>RESIDENTIAL WEATHERIZATION PROJECT</text_data><comment_date>2013-05-28T00:00:00</comment_date></row><row _id="row-6ktk.94kf~w4sv" _uuid="00000000-0000-0000-66AA-1BBA279C7C57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ktk.94kf~w4sv"><intent_id>668749</intent_id><project_id>740735</project_id><text_data>Fringe Breakdown:$17.88---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $10.88 Pension$10.32---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $3.32 Pension</text_data><comment_date>2014-12-06T00:00:00</comment_date></row><row _id="row-3kj2_cbnc-b5q2" _uuid="00000000-0000-0000-E629-4E9939C15580" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3kj2_cbnc-b5q2"><intent_id>865905</intent_id><project_id>829351</project_id><text_data>Oregon Based Company.  Industrial Insurance Not Required.</text_data><comment_date>2017-09-28T00:00:00</comment_date></row><row _id="row-i8rc_at6z_2q6u" _uuid="00000000-0000-0000-4141-990BCDA3AF52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i8rc_at6z_2q6u"><intent_id>972502</intent_id><project_id>877305</project_id><text_data>9N59-0113</text_data><comment_date>2019-04-18T00:00:00</comment_date></row><row _id="row-mvst-7r4s~waha" _uuid="00000000-0000-0000-3F35-415E8ECD59A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mvst-7r4s~waha"><intent_id>955347</intent_id><project_id>870866</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Install Single zone Mitsubishi ductless heat pump 15kbtu#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have? 1 story#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no(b) Any retail use in the structure? no(c) Permanent residence only? yes(d) Rehabilitation house? no(e) Transitional housing? no (f) Communal dining facility? no(g) Treatment services? no(h) Assisted living services? no(I) Dormitories? no(j) Counseling? no(k) Is each room and/or bed in the structure rented separately? no(l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? no#6 - Does each dwelling unit have its own bathroom? no#7 - Is there a community facility or manager�s office on site? no#8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2019-01-16T00:00:00</comment_date></row><row _id="row-6r75_jrqy_96sc" _uuid="00000000-0000-0000-0E06-7BBEAC679FBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6r75_jrqy_96sc"><intent_id>971310</intent_id><project_id>878329</project_id><text_data>Project is exempt from State Prevailing Wage Rates based on the Housing Act of 1937 &amp; 24 CFR 965.101. All workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades/occupations</text_data><comment_date>2019-05-16T00:00:00</comment_date></row><row _id="row-fz6b.hsuy_r9ya" _uuid="00000000-0000-0000-1D94-8FACB138D530" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fz6b.hsuy_r9ya"><intent_id>557309</intent_id><project_id>698407</project_id><text_data>Fringe Benefit Breakdown:Medical = $6.52Pension = $20.27</text_data><comment_date>2013-02-27T00:00:00</comment_date></row><row _id="row-pyni.362m-sfke" _uuid="00000000-0000-0000-A886-BC0D3A000312" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pyni.362m-sfke"><intent_id>858991</intent_id><project_id>830148</project_id><text_data>Correction Notice Notes:A. DESCRIBE WHOLE PROJECT - PUBLIC HOUSING RENOVATIONSB. DESCRIBE OUR PART(S) OF THE PROJECT - THE PERFORMANCE OF SELECTIVE DEMOLITION, ASBESTOS ABATEMENT, AND LEAD REMEDIATIONC. SPECIFICALLY DESCRIBE THE DUTIES BEING PERFORMED BY THE RESIDENTIAL LABORERS AND ANY TOOLS, EQUIPMENT, OR VEHICLES USED - REMOVAL OF VINYL AND WOOD SIDING, ACM-CONTAINING DRYWALL, POPCORN CEILING, ACM CAULKING, CARPETING, CABINETRY, AND TRIMWORK. EQUIPMENT ITEMS: 1-TON TRUCKS, BOOMLIFT, NEG-AIR MACHINES, AND HAND TOOLS.</text_data><comment_date>2017-09-26T00:00:00</comment_date></row><row _id="row-x2nu.7kqj.inyp" _uuid="00000000-0000-0000-B5FC-B30F35E7A6E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x2nu.7kqj.inyp"><intent_id>872242</intent_id><project_id>833755</project_id><text_data>Everything was marked and ready for employee (landscape construction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used</text_data><comment_date>2017-10-31T00:00:00</comment_date></row><row _id="row-zrpf_e5kh-4c4e" _uuid="00000000-0000-0000-E03C-E9D8B0F56301" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zrpf_e5kh-4c4e"><intent_id>1130332</intent_id><project_id>955134</project_id><text_data>The contract number 745675 is incorrect, the actual contract number is PO 192514PS. Requested by Justina Kraus.</text_data><comment_date>2021-03-22T00:00:00</comment_date></row><row _id="row-btv8-sytw_myn7" _uuid="00000000-0000-0000-AC3D-63674134D8ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-btv8-sytw_myn7"><intent_id>1500215</intent_id><project_id>1164676</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2025-01-09T00:00:00</comment_date></row><row _id="row-ag5a-k88s-q245" _uuid="00000000-0000-0000-7B8F-40138740EDDE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ag5a-k88s-q245"><intent_id>508146</intent_id><project_id>686115</project_id><text_data>10/02/2012 SWRTS 4 scales, 2 mechanics, 4 hours $800.00 (quarterly)10/02/2012 ARTS 3 scales, 2 mechanics, 3 hours $600.00 (quarterly)10/02/2012 NCRTS 2 scales, 1 mechanics, 2 hours $ 400.00 (quarterly)10/02/2012 Cathcart 2 scales, 1 mechanics, 2 hours $ 400.00 (quarterly)10/02/2012 ARTS 3.0 hours, 2 mechanics, $525.00(time and materials)</text_data><comment_date>2012-10-03T00:00:00</comment_date></row><row _id="row-4bnk~wk9n.kyzt" _uuid="00000000-0000-0000-BB95-90914265EF3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4bnk~wk9n.kyzt"><intent_id>478323</intent_id><project_id>664420</project_id><text_data>This project is for the replacement of an older bride with a new bridge. Included in the replacement is seeding and shrub plantings. our contract is for the seeding of grass/erosion control seeds as well as planting some erosion control/native plants and spreading some bark/mulch. We will be spreading topsoil up to 6&amp;quot; thick and bark up to 2&amp;quot; thick with shovels, rakes, wheelbarrow, and by hand.</text_data><comment_date>2011-10-03T00:00:00</comment_date></row><row _id="row-xj3y~pd53-wva9" _uuid="00000000-0000-0000-A374-907BDFDB75C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xj3y~pd53-wva9"><intent_id>617383</intent_id><project_id>709535</project_id><text_data>Filed By: Carla Stone�Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the above crafts/trades/occupations.�</text_data><comment_date>2014-02-21T00:00:00</comment_date></row><row _id="row-5vw9_sika~b625" _uuid="00000000-0000-0000-E24C-B939C9078658" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vw9_sika~b625"><intent_id>534350</intent_id><project_id>695887</project_id><text_data>In reply to correction needed email of 09/19/12:Project same scope as outlined on intent #523675We are removing 6� of top soil and sod from around personal houses and replacing landscape boarders, top soil, sod, planters and flowers and shrubs.  We will also be removing rockeries with planters around the same personal residences.We will be replacing landscape rock around the houses and bark dust around the houses.  We will also be placing topsoil and sod at a park where there has been some excavation work previously by another contractor under another contract.</text_data><comment_date>2012-09-18T00:00:00</comment_date></row><row _id="row-s8n5_jqja-6tud" _uuid="00000000-0000-0000-84C8-34895E4DDB68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s8n5_jqja-6tud"><intent_id>912439</intent_id><project_id>853861</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2018-09-12T00:00:00</comment_date></row><row _id="row-ihm4_sjd4.zaic" _uuid="00000000-0000-0000-1455-3D7CF4FC6D18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihm4_sjd4.zaic"><intent_id>1237433</intent_id><project_id>1015500</project_id><text_data>SRO 1916862</text_data><comment_date>2022-05-31T00:00:00</comment_date></row><row _id="row-66ak.trf7.pf4c" _uuid="00000000-0000-0000-1851-07BF9F0DDBEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-66ak.trf7.pf4c"><intent_id>589367</intent_id><project_id>718382</project_id><text_data>043205</text_data><comment_date>2013-08-22T00:00:00</comment_date></row><row _id="row-9gti~d48w.kih3" _uuid="00000000-0000-0000-CF98-B62606643EC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9gti~d48w.kih3"><intent_id>609824</intent_id><project_id>685505</project_id><text_data>Fringe:  Vacation $1.62, Holiday $.89, Medical $1.72, pension $0.09</text_data><comment_date>2013-12-31T00:00:00</comment_date></row><row _id="row-ycfq.5j2z.qbw5" _uuid="00000000-0000-0000-6873-B58F35B36F0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ycfq.5j2z.qbw5"><intent_id>700255</intent_id><project_id>759963</project_id><text_data>Form filed by:  Gary Liles</text_data><comment_date>2015-06-12T00:00:00</comment_date></row><row _id="row-tkf6.ny8x-evdu" _uuid="00000000-0000-0000-F513-4A1B78A82469" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tkf6.ny8x-evdu"><intent_id>1048334</intent_id><project_id>878466</project_id><text_data>The contract amount of $1,966,872,000.00 is incorrect. The correct amount is $1,966,872.00. Requested Barbara Albertson.</text_data><comment_date>2021-03-04T00:00:00</comment_date></row><row _id="row-zxry~439g_hvw7" _uuid="00000000-0000-0000-EDD5-D4B0118BB8DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxry~439g_hvw7"><intent_id>647071</intent_id><project_id>741515</project_id><text_data>INSULATOR FRINGE: $10.59 HW, $7.81 PEN, 1.47 OTHERCARPENTER FRINGE: $7.44 HW, $.83 OTHER</text_data><comment_date>2014-08-11T00:00:00</comment_date></row><row _id="row-7hpz_xh3g~cyxc" _uuid="00000000-0000-0000-187A-CFF56DF913CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7hpz_xh3g~cyxc"><intent_id>777537</intent_id><project_id>797973</project_id><text_data>CORRECT LICENSE #SEIFEEL870M2</text_data><comment_date>2016-08-02T00:00:00</comment_date></row><row _id="row-is3r_2st3.5ywj" _uuid="00000000-0000-0000-F217-8266066559C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-is3r_2st3.5ywj"><intent_id>1318891</intent_id><project_id>1062907</project_id><text_data>We have an Idaho worker's comp policy that covers our employees in Washington and Idaho. Policy# KWC1314020</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-hmkn_ferk-9r3t" _uuid="00000000-0000-0000-B3E8-C4D806EC401D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hmkn_ferk-9r3t"><intent_id>773932</intent_id><project_id>795470</project_id><text_data>Installation of CAT6 cables between MDF/IDF and multiple workstations.  All cables can be used for either telephone (voice over distance) or data (bits and bytes) connection within the telecommunications system.  All work to be performed indoors.</text_data><comment_date>2016-07-11T00:00:00</comment_date></row><row _id="row-gp57~u6qh~aipx" _uuid="00000000-0000-0000-679D-3285950055BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gp57~u6qh~aipx"><intent_id>785516</intent_id><project_id>799524</project_id><text_data>A) The improvement of Wellesley Avenue/Freya Street Intersection in the City of Spokane, at US 395 MP 160.46, by performing clearing and grubbing, earthwork, surfacing, drainage, HMA and PCCP paving, curb and gutter, sidewalk,illumination, signing, pavement markings, landscaping, traffic controlB) Supply and install plant material, place 3� mulch in planting beds, seed lawn.  Equipment to be used:  hand tools, power equipment under 90 hp (bobcat, mini-excavator.  Project has federal funds.</text_data><comment_date>2016-08-26T00:00:00</comment_date></row><row _id="row-hpsp-pfrc-qba2" _uuid="00000000-0000-0000-62BC-DA53C816D2DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hpsp-pfrc-qba2"><intent_id>1263012</intent_id><project_id>986149</project_id><text_data>McCanns portion of the work will consist of excavation &amp; general labor including digging, unloading material, etc. Tools to be used would consist of shovels, rakes, brooms, and a mini excavator.</text_data><comment_date>2022-09-19T00:00:00</comment_date></row><row _id="row-hu5t~b8zn_q8mc" _uuid="00000000-0000-0000-63CD-CC844C42F66B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hu5t~b8zn_q8mc"><intent_id>1204045</intent_id><project_id>976093</project_id><text_data>ground up construction of new elementary school, we will be supplying and installing plant material, automatic irrigation, field subdrainage, import topsoils, hydroseeding and drill seeding, one year maintenance</text_data><comment_date>2022-01-12T00:00:00</comment_date></row><row _id="row-89q4.e2h9-usup" _uuid="00000000-0000-0000-9E9E-3E1DDB9712E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89q4.e2h9-usup"><intent_id>532110</intent_id><project_id>687603</project_id><text_data>2&amp;quot; mulch depth</text_data><comment_date>2012-09-06T00:00:00</comment_date></row><row _id="row-rzwb-ahbk~dxzv" _uuid="00000000-0000-0000-F06A-285AC735566F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzwb-ahbk~dxzv"><intent_id>1115923</intent_id><project_id>900189</project_id><text_data>Workers Compensation is not applicable as we will not have any Washington residents on the project.Fringe Breakdown-Vacation - $4.87Health &amp; Welfare - $8.00Pension- $8.81Apprentice Training - $.69Other- $1.12</text_data><comment_date>2021-02-08T00:00:00</comment_date></row><row _id="row-pqr5~7xue_n6zf" _uuid="00000000-0000-0000-BE4B-F398AEB9EF3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqr5~7xue_n6zf"><intent_id>658869</intent_id><project_id>746030</project_id><text_data>Several manufactured homes within Deer Lake	#1 - Heating duct sealing. #2 - Single family manufactured home? #3 - 1 level? #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2014-10-07T00:00:00</comment_date></row><row _id="row-mqp8_yukf.uvtb" _uuid="00000000-0000-0000-87F5-036ED07493E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mqp8_yukf.uvtb"><intent_id>886976</intent_id><project_id>843084</project_id><text_data>SO 138050</text_data><comment_date>2018-02-06T00:00:00</comment_date></row><row _id="row-qqrj.jrc2~q7u3" _uuid="00000000-0000-0000-99E8-07DDB14C0A9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qqrj.jrc2~q7u3"><intent_id>1184964</intent_id><project_id>983354</project_id><text_data>Specialized Service - Ladder / Scissor Lift, Calipers, Wrenches / Screw Drivers for access to see under covers / plugs</text_data><comment_date>2021-10-12T00:00:00</comment_date></row><row _id="row-4w3c.bebd.4mbm" _uuid="00000000-0000-0000-53D3-7FF9C6FE150E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4w3c.bebd.4mbm"><intent_id>945785</intent_id><project_id>864983</project_id><text_data>Job 181071</text_data><comment_date>2018-11-14T00:00:00</comment_date></row><row _id="row-rhiu_vmz6.j4nf" _uuid="00000000-0000-0000-6186-5168267EFD03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rhiu_vmz6.j4nf"><intent_id>555281</intent_id><project_id>704487</project_id><text_data>UNITS 1 - 201 CRAWFORD 2208 E 33RD ST, VANCOUVER	2 GEIGER 36824 SE SUNSET VIEW RD, WASHOUGAL	3 LENOIR 10012 NE 7TH ST, VANCOUVER	4 BANUELOS 11515 NE 71ST ST #47, VANCOUVER	5 CASSIDY 737 SE SUMNER ST, CAMAS	6 CONGOS 5101 NE 121ST AVE, VANCOUVER	7 JENSEN 7012 NE 133RD AVE, VANCOUVER	8 AMORUSO-LANE 18515 NE 259TH ST, BATTLE GROUND	9 DAW 621 SE 121ST AVE #27, VANCOUVER	10 CULBERTSON 16006 NE GRANTHAM RD, AMBOY	11 LOHBERGER 6610 NW WHITNEY RD, VANCOUVER	12 TODD 112 E 28TH ST, VANCOUVER	13 OSBORN 3909 E 4TH PLAIN BLVD #4, VANCOUVER	14 MARTINEZ 4410 NE WILDROSE DR, VANCOUVER	15 SYKES 5511 ALKI RD, VANCOUVER	16 CRANDALL 8809 SILVER STAR AVE, VANCOUVER	17 LEEVERS 10806 NE 26TH ST, VANCOUVER	18 BROWN 11005 NE 76TH ST #26, VANCOUVER	19 LOWES 13217 NE 59TH ST #100, VANCOUVER	20 HERNANDEZ 7300 NE 100TH AVE #13, VANCOUVER</text_data><comment_date>2013-02-07T00:00:00</comment_date></row><row _id="row-jukv~c2xm~j4wp" _uuid="00000000-0000-0000-9449-BCEF56806A86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jukv~c2xm~j4wp"><intent_id>1044273</intent_id><project_id>910831</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a - no; 4b - no; 4c - yes; 4d - no; 4e - no; 4f - no; 4g - no; 4h - no; 4i - no; 4j - no; 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2020-03-10T00:00:00</comment_date></row><row _id="row-h7yd_gy4u~fm8z" _uuid="00000000-0000-0000-CD52-1E8A91DFB1DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h7yd_gy4u~fm8z"><intent_id>1004209</intent_id><project_id>888137</project_id><text_data>Light concrete work was nothing more then drilling in bolts to secure benches with the flange to the concrete.</text_data><comment_date>2019-09-23T00:00:00</comment_date></row><row _id="row-aye8.4447_5x78" _uuid="00000000-0000-0000-4056-C618D5033867" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aye8.4447_5x78"><intent_id>709885</intent_id><project_id>768156</project_id><text_data>Fringe Benefits:$2.00  I.A.P.$5.51  Pension$ .12  Occ. Health$8.84  Health &amp; Welfare$1.00  Apprenticeship$0.10  Industry Fund$0.05  LMCT______$17.62</text_data><comment_date>2015-07-24T00:00:00</comment_date></row><row _id="row-77r7-jyqr.64mv" _uuid="00000000-0000-0000-5914-73B13011965E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-77r7-jyqr.64mv"><intent_id>1500555</intent_id><project_id>1164882</project_id><text_data>Equipment Haul using a Kenworth 6x4 Bogie Axle 56,000 GVW Diesel.</text_data><comment_date>2025-01-10T00:00:00</comment_date></row><row _id="row-yadh-fxhh_6ijb" _uuid="00000000-0000-0000-725C-56C827377B1B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yadh-fxhh_6ijb"><intent_id>768211</intent_id><project_id>793088</project_id><text_data>Telecommunications scope of work includes installation of CAT6 cables between the Concessions IDF and 15 workstations.  The purpose of this cable is to provide either telephone (voice over distance) or data (bits and bytes) connection within the telecommunications system.  This work will be performed indoors.</text_data><comment_date>2016-06-14T00:00:00</comment_date></row><row _id="row-jj6u.nfuw~53a5" _uuid="00000000-0000-0000-96AE-357A0BA203E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jj6u.nfuw~53a5"><intent_id>836388</intent_id><project_id>822681</project_id><text_data>Filed by Dayn McCray.</text_data><comment_date>2017-05-25T00:00:00</comment_date></row><row _id="row-kpvj-5haq~3b5v" _uuid="00000000-0000-0000-B3A9-A5670E9C5ED3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kpvj-5haq~3b5v"><intent_id>1263084</intent_id><project_id>991012</project_id><text_data>JASON PRESTON is Estimator for this project</text_data><comment_date>2022-08-31T00:00:00</comment_date></row><row _id="row-mdeg-urjk.6b5i" _uuid="00000000-0000-0000-C4F6-1E832F727591" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mdeg-urjk.6b5i"><intent_id>696564</intent_id><project_id>761786</project_id><text_data>The entire scope of work includes reconstruction of sidewalks on Wellesley avenue; our work includes topsoil type C installation to a depth of 4&amp;quot; and seeding, fertilizing and mulching.  We will be using a skidsteer, wheelbarrows, shovels and other misc. and tools.</text_data><comment_date>2015-05-26T00:00:00</comment_date></row><row _id="row-qzp8_mz9d.n5gd" _uuid="00000000-0000-0000-4315-9F88CF1155B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qzp8_mz9d.n5gd"><intent_id>553209</intent_id><project_id>703555</project_id><text_data>Form Filed By: Greg Babcock</text_data><comment_date>2013-01-23T00:00:00</comment_date></row><row _id="row-6m6w_vmkc-ih4n" _uuid="00000000-0000-0000-44F5-EFC89833D30D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6m6w_vmkc-ih4n"><intent_id>610033</intent_id><project_id>723959</project_id><text_data>Install low voltage communications cables for Security Exit Lane Breach Control</text_data><comment_date>2013-12-30T00:00:00</comment_date></row><row _id="row-wbdn_uq75-kn36" _uuid="00000000-0000-0000-50A3-D2FC4F3A4F12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wbdn_uq75-kn36"><intent_id>699739</intent_id><project_id>753530</project_id><text_data>1.  Holroyd Co, Inc.  does not concede that its concrete delivery drivers are properly covered by the prevailing wage statues &amp; regulations in Washington; and 2.  Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2015-06-10T00:00:00</comment_date></row><row _id="row-rc3m_qb4t~pse8" _uuid="00000000-0000-0000-DD45-69D03DEC821C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rc3m_qb4t~pse8"><intent_id>920675</intent_id><project_id>843530</project_id><text_data>Drill &amp; Install 2&amp;quot; Monitoring Well, Decommission Same, Install Dewatering System if needed</text_data><comment_date>2018-07-25T00:00:00</comment_date></row><row _id="row-cabu-r5ca~48rx" _uuid="00000000-0000-0000-9724-39C301AA78F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cabu-r5ca~48rx"><intent_id>880774</intent_id><project_id>835098</project_id><text_data>Filed by Randy Roosendaal</text_data><comment_date>2017-12-26T00:00:00</comment_date></row><row _id="row-efxz_iehh_ifak" _uuid="00000000-0000-0000-F501-9367EDC3C29A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efxz_iehh_ifak"><intent_id>488976</intent_id><project_id>678135</project_id><text_data>No Journey level employees</text_data><comment_date>2011-11-15T00:00:00</comment_date></row><row _id="row-az6h_sdkn_tj4g" _uuid="00000000-0000-0000-ED6A-51076C76E1A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-az6h_sdkn_tj4g"><intent_id>573142</intent_id><project_id>710660</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the listed crafts/trades/occupations.Filed by Lester Smith.</text_data><comment_date>2013-06-04T00:00:00</comment_date></row><row _id="row-fhim~apsu_fmfs" _uuid="00000000-0000-0000-F3F3-0682C0D5C154" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fhim~apsu_fmfs"><intent_id>479433</intent_id><project_id>639499</project_id><text_data>Tri-State Job # 1110Trucking &amp; Services: Owner/Operator</text_data><comment_date>2011-09-21T00:00:00</comment_date></row><row _id="row-dfx8-2cuf-sakh" _uuid="00000000-0000-0000-1427-27653816BE57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfx8-2cuf-sakh"><intent_id>1163160</intent_id><project_id>972136</project_id><text_data># 1. scrapp off loose paint and repaint the exteior #2. single family home. # 3 . one. # 4. a) no. b) no. c) yes. d) no . e) no. f ) no. g) no. h), i) no.j) no.  k ) no.. l) no. # 5. no. # 6) no. # 7) no. # 8) no.</text_data><comment_date>2021-07-24T00:00:00</comment_date></row><row _id="row-eige_8iy4-4ib6" _uuid="00000000-0000-0000-2095-BD3709706884" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eige_8iy4-4ib6"><intent_id>1318518</intent_id><project_id>1062671</project_id><text_data>431579 Issaquah HS Stadium Fixtures. Re-lamp (9) fixtures.</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-n7x9.pr87.uygi" _uuid="00000000-0000-0000-3684-CAF31F4DB73F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n7x9.pr87.uygi"><intent_id>518348</intent_id><project_id>690206</project_id><text_data>Other Trucks - Water Truck</text_data><comment_date>2012-06-22T00:00:00</comment_date></row><row _id="row-nkr9_vh5c-ffac" _uuid="00000000-0000-0000-D832-E9B115828718" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nkr9_vh5c-ffac"><intent_id>569162</intent_id><project_id>708246</project_id><text_data>Job is repaving  erosion control worker will be placing. compost sock and pounding in stakes</text_data><comment_date>2013-05-16T00:00:00</comment_date></row><row _id="row-2kch~ktst~rriu" _uuid="00000000-0000-0000-FC37-213C08CF6A7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2kch~ktst~rriu"><intent_id>948489</intent_id><project_id>867701</project_id><text_data>Continuing with my earlier note, the Millwright designation should apply to the one employee on the job who is a true up-tower wind technician.  The second employee on this project, whom I found out about after writing my previous note, is actually just a shop employee who works about 90% of his time in our Pasco, WA shop.  He was only taken along that day because assistance was needed for that particular job.  Therefore, I used &amp;quot;Electricians - Motor Shop&amp;quot; as his trade since that&amp;#39;s what would pertain to his day-to-day regular job duties.</text_data><comment_date>2018-12-03T00:00:00</comment_date></row><row _id="row-kp89_2hs6.8j2i" _uuid="00000000-0000-0000-BEEA-4E39CF626547" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kp89_2hs6.8j2i"><intent_id>1227174</intent_id><project_id>1009452</project_id><text_data>INV # 88706419 SR # 51699690</text_data><comment_date>2022-04-20T00:00:00</comment_date></row><row _id="row-gqbk.7mak.m4uf" _uuid="00000000-0000-0000-54BF-63F6D136F4EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqbk.7mak.m4uf"><intent_id>526466</intent_id><project_id>692846</project_id><text_data>job 120740</text_data><comment_date>2012-08-03T00:00:00</comment_date></row><row _id="row-d4rg-5rm9~pqda" _uuid="00000000-0000-0000-33E0-2BC8C653ED6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4rg-5rm9~pqda"><intent_id>1240152</intent_id><project_id>973901</project_id><text_data>PR69751 - Lake Creek and Norway Creek Fish Passage</text_data><comment_date>2022-06-09T00:00:00</comment_date></row><row _id="row-infw~3m6u~7jaq" _uuid="00000000-0000-0000-4201-889093464C0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-infw~3m6u~7jaq"><intent_id>560544</intent_id><project_id>696435</project_id><text_data>Filed By Dmitriy Chernomoret</text_data><comment_date>2013-04-19T00:00:00</comment_date></row><row _id="row-z3ic_fpyd.wicd" _uuid="00000000-0000-0000-A435-F8776F55774F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3ic_fpyd.wicd"><intent_id>801790</intent_id><project_id>807412</project_id><text_data>Truck Drivers:Dump Truck is 10 Cubic Yard End DumpOther Trucks is a 2000 gallon tank Water Truck</text_data><comment_date>2016-11-18T00:00:00</comment_date></row><row _id="row-9ixq_6xqu.nyvq" _uuid="00000000-0000-0000-C871-E7216EDA850B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ixq_6xqu.nyvq"><intent_id>913160</intent_id><project_id>817013</project_id><text_data>PME job# 1722-02TRUCKSlowboy delivers asphalt rotomill to jobsitesweeper driven to jobsite</text_data><comment_date>2018-06-22T00:00:00</comment_date></row><row _id="row-7rtm~s23g.ix9f" _uuid="00000000-0000-0000-28B4-0181B653140D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7rtm~s23g.ix9f"><intent_id>803758</intent_id><project_id>786227</project_id><text_data>Parking Lot Striping</text_data><comment_date>2016-11-21T00:00:00</comment_date></row><row _id="row-m92d.ecqr_jxfa" _uuid="00000000-0000-0000-33F5-4ED9A73D244F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m92d.ecqr_jxfa"><intent_id>971260</intent_id><project_id>864764</project_id><text_data>FILED BY BRENDA LUMSCH</text_data><comment_date>2019-04-12T00:00:00</comment_date></row><row _id="row-j2r8~igp7_yc3p" _uuid="00000000-0000-0000-AE6B-38E43A64121D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j2r8~igp7_yc3p"><intent_id>1060930</intent_id><project_id>920367</project_id><text_data>Other Truck-WATER Truck: Dust Control/Clean Asphalt</text_data><comment_date>2020-06-01T00:00:00</comment_date></row><row _id="row-unxk.p73k_w9yd" _uuid="00000000-0000-0000-A864-7A0DE9C44050" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-unxk.p73k_w9yd"><intent_id>543031</intent_id><project_id>699096</project_id><text_data>this is for planting 33 trees.this work will be done with shovel.</text_data><comment_date>2012-11-05T00:00:00</comment_date></row><row _id="row-23we_fmwb-r2q4" _uuid="00000000-0000-0000-931D-C42958AACD9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-23we_fmwb-r2q4"><intent_id>814264</intent_id><project_id>812686</project_id><text_data>Prevailing Wages have been paid at the set rate of $46.09/hour.</text_data><comment_date>2017-02-02T00:00:00</comment_date></row><row _id="row-uec8.dnwg~xexk" _uuid="00000000-0000-0000-92F1-0281F71F2771" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uec8.dnwg~xexk"><intent_id>582178</intent_id><project_id>715823</project_id><text_data>Filed by Angela D CasidaJuly 10, 2013Prevailing Wage SectionDepartment of Labor &amp; IndustriesPO Box 44540Olympia, WA  98504-4540Subject:	Statement of Intent to Pay Prevailing WagesProject: Grays Harbor College � Electrical Load CalculationThis Letter is intended to address our request for an exemption for prevailing wages for the subject project. The project name is as stated in the Subject line above. Our contract is with Grays Harbor College to perform electrical engineering professional services, specifically the task of electrical load monitoring and calculations.1.  Purpose of Project?     a. The purpose of the work performed by Sigma Six Solutions is to provide professional electrical testing and engineering services to measure the electrical load at one of the college�s buildings to help determine if additional loads can be added in the future.2.  Remodeling or News Construction:     a. Sigma Six�s work does not entail remodeling or construction activities or tasks; the work to be performed is only electrical measurement and engineering calculations. This project is not altering the existing facility in any manner.3.  Specific Tasks Performed by Sigma Six Solutions:     a. Grays Harbor College�s electricians will open the cabinets for the Sigma Six engineer to take the electrical load measurements. This work does not involve any disassembly or re-assembly activity.     b. A Sigma Six employee will use portable test equipment to measure the existing electrical load (electrical current). The test equipment is owned by sigma six and is not part of the project or product involved. Not tool work, assembly, disassembly, or other construction craft activity will be performed by any Sigma Six employee. Grays Harbor College�s electricians will open and close cabinets as necessary to obtain the measurements.     c. A Sigma Six employee will provide the College with a written report.4.  Tools Used by Sigma Six Solutions:     a.  No had or construction tools will be used by Sigma Six employees.5. Sigma Six Employee Hands-On Effort:    a.  Sigma Six employees will operate portable test instruments owned by Sigma Six Solutions and record data for the report. Sigma Six employees are certified through examination as electrical test technicians by the InterNational Electrical Testing Association.Please feel free to contact me (253-333-9730) if further information or clarification is desired.Sincerely,John White, P.E.General ManagerSigma Six Solutions</text_data><comment_date>2013-07-19T00:00:00</comment_date></row><row _id="row-65na~6vqk-9cpn" _uuid="00000000-0000-0000-255C-029A8EC77140" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-65na~6vqk-9cpn"><intent_id>927322</intent_id><project_id>858186</project_id><text_data>Installation and removal of temporary construction fence.</text_data><comment_date>2018-08-21T00:00:00</comment_date></row><row _id="row-vxyf_phxb.2x97" _uuid="00000000-0000-0000-D488-BA66A6E5D314" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vxyf_phxb.2x97"><intent_id>1202443</intent_id><project_id>985032</project_id><text_data>4th location should be listed</text_data><comment_date>2022-01-04T00:00:00</comment_date></row><row _id="row-r2dq~7s9j~q4mb" _uuid="00000000-0000-0000-0D3A-07B1CE073253" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r2dq~7s9j~q4mb"><intent_id>1277956</intent_id><project_id>986351</project_id><text_data>We will be installing Seed,Trees,Rootbarrier and Mulch</text_data><comment_date>2022-10-26T00:00:00</comment_date></row><row _id="row-y26m~ni8d_9k9g" _uuid="00000000-0000-0000-6EDD-C24F34A43D5B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y26m~ni8d_9k9g"><intent_id>511226</intent_id><project_id>687861</project_id><text_data>Filed by: Lynn Brown</text_data><comment_date>2012-05-09T00:00:00</comment_date></row><row _id="row-bpaq_ri5i_dm9p" _uuid="00000000-0000-0000-6DBE-33BBC97D1F43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bpaq_ri5i_dm9p"><intent_id>963541</intent_id><project_id>874768</project_id><text_data>Lump sum work for an amount.</text_data><comment_date>2019-03-05T00:00:00</comment_date></row><row _id="row-7btk~94q5~a579" _uuid="00000000-0000-0000-2F5E-CA3D1E465BDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7btk~94q5~a579"><intent_id>893926</intent_id><project_id>837432</project_id><text_data>Install cable inside building for Access Control</text_data><comment_date>2018-03-21T00:00:00</comment_date></row><row _id="row-f4jn.mhrd_taxk" _uuid="00000000-0000-0000-C943-03DFE8EE0CB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f4jn.mhrd_taxk"><intent_id>612928</intent_id><project_id>714543</project_id><text_data>Health &amp; Welfare - $7.24, Pension Fund - $10.27, Retirement Plan - $3.45, NEBF/Union - $2.11</text_data><comment_date>2014-01-21T00:00:00</comment_date></row><row _id="row-76xr_cvz7.9bmp" _uuid="00000000-0000-0000-7D9E-66AF6910EEB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-76xr_cvz7.9bmp"><intent_id>723213</intent_id><project_id>773439</project_id><text_data>73370-0003</text_data><comment_date>2015-09-28T00:00:00</comment_date></row><row _id="row-kscv_9yu6.f2rd" _uuid="00000000-0000-0000-CBF1-0639E1E19097" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kscv_9yu6.f2rd"><intent_id>838662</intent_id><project_id>818586</project_id><text_data>Job has multiple locations in two different counties, Benton &amp; Franklin. This job is higher of the two (state vs. federal), federal wage for cement mason / concrete finishers is either the same or higher. This is the wages we will be using: $27.13 base + $13.67 fringe = $40.80</text_data><comment_date>2017-06-06T00:00:00</comment_date></row><row _id="row-m73n_wq7u-774k" _uuid="00000000-0000-0000-15BD-0BBD51C85962" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m73n_wq7u-774k"><intent_id>924156</intent_id><project_id>842840</project_id><text_data>Other truck - Water truck Other truck - lowboy/lowbed heavy duty trailer</text_data><comment_date>2018-08-08T00:00:00</comment_date></row><row _id="row-c3p4-kmqp-kdxp" _uuid="00000000-0000-0000-92F3-6D12AF052114" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c3p4-kmqp-kdxp"><intent_id>1143656</intent_id><project_id>961830</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.  Inspection and Sweeping as Necessary for (27) Apartment fireplaces.  This includes visual inspection of the fireplace and chimney.  If needed, clean the chimney pipe with a chimney brush and vacuum out firebox.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment complex#3 - Including any basement or garage, how many stories or levels does the structure have? 2 Story#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No(b) Any retail use in the structure? No(c) Permanent residence only? Yes(d) Rehabilitation house? No(e) Transitional housing? No(f) Communal dining facility? No(g) Treatment services? No(h) Assisted living services? No(i) Dormitories? No(j) Counseling? No(k) Is each room and/or bed in the structure rented separately? Yes(l) Other services or uses? No#5 - Does each dwelling unit have its own self-contained kitchen? Yes#6 - Does each dwelling unit have its own bathroom? Yes#7 - Is there a community facility or manager�s office on site? Yes#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2021-05-17T00:00:00</comment_date></row><row _id="row-bhh5.wtg9-tj4h" _uuid="00000000-0000-0000-723C-03882FA17260" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bhh5.wtg9-tj4h"><intent_id>863072</intent_id><project_id>832730</project_id><text_data>This job is an irrigation system upgrade. Work will include installing, servicing or repairing above ground lawn sprinkler system to a maximum depth of three feet below finish grade. All work falls within the Landscape Construction category.</text_data><comment_date>2017-09-15T00:00:00</comment_date></row><row _id="row-ewed-wxzb-66qf" _uuid="00000000-0000-0000-6ADF-59142A2626F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ewed-wxzb-66qf"><intent_id>1151930</intent_id><project_id>966331</project_id><text_data>Fringes: Vacation $4.00, Assessment $1.30, Insurance $9.01, Pension $14.55, Training $2.08, Industry Improvement $.50</text_data><comment_date>2021-06-11T00:00:00</comment_date></row><row _id="row-tuar.ikmv-tced" _uuid="00000000-0000-0000-9F7C-4A8DACFC81BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tuar.ikmv-tced"><intent_id>943576</intent_id><project_id>865608</project_id><text_data>Filed by Kerri Niemeyer</text_data><comment_date>2018-11-02T00:00:00</comment_date></row><row _id="row-6tnh~zz4j~hryx" _uuid="00000000-0000-0000-E714-B3801E573E2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6tnh~zz4j~hryx"><intent_id>912413</intent_id><project_id>853849</project_id><text_data>Cleaning of Urinals on The East side of Building. To clean out Calcium build up. Installed new Flushometers on  Urinals.Checked Floor drains for Leaks in down stairs bathroom.</text_data><comment_date>2018-06-19T00:00:00</comment_date></row><row _id="row-5rga_9ynu~rktj" _uuid="00000000-0000-0000-F94B-53E69EB5F2CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5rga_9ynu~rktj"><intent_id>760734</intent_id><project_id>791397</project_id><text_data>Single Family Dwelling</text_data><comment_date>2016-05-06T00:00:00</comment_date></row><row _id="row-hf6s-vq5x-pafz" _uuid="00000000-0000-0000-EB77-D3011D85FF7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hf6s-vq5x-pafz"><intent_id>959428</intent_id><project_id>870081</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2019-02-07T00:00:00</comment_date></row><row _id="row-zdb2.25ms.rbk3" _uuid="00000000-0000-0000-3970-AFE5F797064E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdb2.25ms.rbk3"><intent_id>1006738</intent_id><project_id>888046</project_id><text_data>Other Truck - Water TruckOther Truck - Lowboy heavy duty trailer</text_data><comment_date>2019-09-12T00:00:00</comment_date></row><row _id="row-qepz-iwxh~vc3i" _uuid="00000000-0000-0000-2668-28A383FD2AC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qepz-iwxh~vc3i"><intent_id>653764</intent_id><project_id>743201</project_id><text_data>Form filed by: Emmanuel Akpata</text_data><comment_date>2014-09-11T00:00:00</comment_date></row><row _id="row-3678~ybxw.ne8i" _uuid="00000000-0000-0000-8665-60E3C36A419D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3678~ybxw.ne8i"><intent_id>1113460</intent_id><project_id>956662</project_id><text_data>Owner is the only one on the job.</text_data><comment_date>2021-04-01T00:00:00</comment_date></row><row _id="row-952w~zgma_nqpi" _uuid="00000000-0000-0000-E285-926769EB2EAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-952w~zgma_nqpi"><intent_id>566357</intent_id><project_id>689679</project_id><text_data>Douglas Prickett500 Hall Rd #26Yakima, Wa 98908509-966-1308</text_data><comment_date>2013-04-24T00:00:00</comment_date></row><row _id="row-sznc~3n8u_zuzs" _uuid="00000000-0000-0000-5106-B56BDFBE336E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sznc~3n8u_zuzs"><intent_id>769551</intent_id><project_id>794949</project_id><text_data>PC 6 JOB # 6149 SO218904</text_data><comment_date>2016-06-20T00:00:00</comment_date></row><row _id="row-hgc7.ejfc_6772" _uuid="00000000-0000-0000-1698-6A7F19AAB382" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hgc7.ejfc_6772"><intent_id>800624</intent_id><project_id>801204</project_id><text_data>Job #  16-617 Trench dig</text_data><comment_date>2016-11-09T00:00:00</comment_date></row><row _id="row-jg2d-cszs~prpb" _uuid="00000000-0000-0000-A6C1-A85FBC25452E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jg2d-cszs~prpb"><intent_id>474591</intent_id><project_id>673137</project_id><text_data>Pressure wash the under side of the play shed removing all loose paint. Prime and paint all the steel under the play shed.  Site clean up. Equipment/tools used: Airless paint sprayers, man lift and misc. hand tools. The whole project and my part of the project are the same.</text_data><comment_date>2011-09-14T00:00:00</comment_date></row><row _id="row-azrg_i3cm-twyb" _uuid="00000000-0000-0000-F8C0-3DE1BE350175" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-azrg_i3cm-twyb"><intent_id>518127</intent_id><project_id>661000</project_id><text_data>****This form is being approved on the basis of your statement that your employees performed no tasks which required the use of tools except a laptop computer, calculator, video and audio recording devices, and hand held radios. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.****</text_data><comment_date>2012-07-12T00:00:00</comment_date></row><row _id="row-cjpg-fgdf-6y94" _uuid="00000000-0000-0000-92F7-26F9B657C8D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjpg-fgdf-6y94"><intent_id>997999</intent_id><project_id>888930</project_id><text_data>22699</text_data><comment_date>2019-08-08T00:00:00</comment_date></row><row _id="row-f22h.4cn7-3c4x" _uuid="00000000-0000-0000-2B67-4FF09A907EE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f22h.4cn7-3c4x"><intent_id>627383</intent_id><project_id>688819</project_id><text_data>1.	What is the specific purpose of this awarding agency�s public works project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc.   � HVAC Alternation2.	Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. {See WAC 296-127-010(7) (a)(vi), WAC 296-127-020(3)} � NO3.	Does this specific project entail the remodeling or new construction of a facility? Alteration to HVAC System is what the General Contractor is doing. Robert Lloyd Sheet Metal sent an PE Engineer to the site to perform work on a computer SQL Server.4.	If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control systems, door security access system, burglar alarm system, telecommunication cabling, etc. � HVAC5.	What specific tasks will your employees perform? Computer Database work6.	What, if any, tools will your employees use in the performance of those tasks? None7.	If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?  None8.	Are you going to be hiring any subcontractors for this project? None*******To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification�, �commissioning� or similar work, specifically explain the specific tasks the process involves.</text_data><comment_date>2014-04-30T00:00:00</comment_date></row><row _id="row-5cbm~625p-h48n" _uuid="00000000-0000-0000-9AB0-57C21F73B4EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5cbm~625p-h48n"><intent_id>643350</intent_id><project_id>734596</project_id><text_data>1114119</text_data><comment_date>2014-07-24T00:00:00</comment_date></row><row _id="row-7egp-x9xq_jkgp" _uuid="00000000-0000-0000-FE0D-FEA349C968E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7egp-x9xq_jkgp"><intent_id>531661</intent_id><project_id>690617</project_id><text_data>Truck Driver Other Trucks is for a 4000 gallon water truck</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-fij3.axfi.mk3v" _uuid="00000000-0000-0000-7310-AC1E69EB1376" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fij3.axfi.mk3v"><intent_id>625200</intent_id><project_id>694164</project_id><text_data>Form filed by: Jim Bush</text_data><comment_date>2014-04-16T00:00:00</comment_date></row><row _id="row-qq44_qvpq_frju" _uuid="00000000-0000-0000-EF60-765E235C6706" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qq44_qvpq_frju"><intent_id>924499</intent_id><project_id>858299</project_id><text_data>Employees drive either a 2500 or a 3500 Chevy Silverado to and from the job site. From the quarterly maintenance, the following items are to be repaired at the YSC Building: Belts / Oil Pressure Sender / Pressure Gauge **This intent is being refiled under Legacy Telecommunications LLC; the previous intent was filed under Legacy Telecommunications INC**</text_data><comment_date>2018-08-09T00:00:00</comment_date></row><row _id="row-aw3n-pqve.q59x" _uuid="00000000-0000-0000-0242-6F5DA3E7396C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aw3n-pqve.q59x"><intent_id>521782</intent_id><project_id>691409</project_id><text_data>Mob and excavate 2 areas of impacted soil and dispose of soilGeneral Laborers to clean area using brooms, shovels and small hand toolsDump Truck &amp; Trailer used to mobe in/out Excavator and dispose of impacted soilExcavator used to remove impacted soil</text_data><comment_date>2012-07-12T00:00:00</comment_date></row><row _id="row-tie7-k42w.qvum" _uuid="00000000-0000-0000-0B56-B39D71D04B23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tie7-k42w.qvum"><intent_id>882534</intent_id><project_id>828395</project_id><text_data>WCISAP: .06: Pension: $9.70, H&amp;W: $6.46; LMCI: $.10: Total: 17.32</text_data><comment_date>2018-01-09T00:00:00</comment_date></row><row _id="row-p5cu.dde6.4w9q" _uuid="00000000-0000-0000-D4F2-B00AB5254EAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p5cu.dde6.4w9q"><intent_id>711096</intent_id><project_id>742855</project_id><text_data>Approval of this form does not signify approval of the classifications of labor listed on the form. The basis for approval is the criteria that the prevailing rate of wage/benefits listed equals or exceeds the amount published for the classification of labor listed.</text_data><comment_date>2015-08-03T00:00:00</comment_date></row><row _id="row-ewt6~aiqr_7uqy" _uuid="00000000-0000-0000-B711-9F04203C79D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ewt6~aiqr_7uqy"><intent_id>453393</intent_id><project_id>665085</project_id><text_data>We are an Oregon based company.  Employees working on this job are residents of Oregon and will be covered under the Oregon SUI.  We currently do not have any Washington residents on payroll.</text_data><comment_date>2011-06-16T00:00:00</comment_date></row><row _id="row-smz4.ptht~pndv" _uuid="00000000-0000-0000-A281-6BB9965060EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-smz4.ptht~pndv"><intent_id>808225</intent_id><project_id>809852</project_id><text_data>Install Panic Alarm System</text_data><comment_date>2016-12-21T00:00:00</comment_date></row><row _id="row-dncj-v6g6_uxmz" _uuid="00000000-0000-0000-D008-71958481CC67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dncj-v6g6_uxmz"><intent_id>1166028</intent_id><project_id>973541</project_id><text_data>Hourly Fringe Benefits: $6.75 Medical; $0.83 JATC - Apprentice Training; $14.31 Pension</text_data><comment_date>2021-08-12T00:00:00</comment_date></row><row _id="row-du94-k334_4u27" _uuid="00000000-0000-0000-9068-C94714E8CB18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-du94-k334_4u27"><intent_id>1038039</intent_id><project_id>908237</project_id><text_data>Correction:In order to finish processing your form, we need more information. A) Please describe the whole project � not just your part.        We were the entire project - service call for gate not workingB) Please describe your part(s) of the project.        This was just a service call for a gate not working. Scope of Work: Ongoing issues with gate not closing fully. Today closing about 2/3 of the way. C) Please specifically describe the duties being performed by the Millwright and any tools, equipment, or vehicles used. Please put these details into your notes.Duties: Result: 1/30 - Troubleshot problem with operation. Locked toggle back in drive mode and tested. All edges and radio gear okay. Allen said was slipping in rail this morning. Adjusted tension on toggle release spring and drilled a series of traction holes in drive rail at each end of travel. Tested several times; okay.Tools used: Wrenches Vehicle used: Ford Econoline van</text_data><comment_date>2020-03-03T00:00:00</comment_date></row><row _id="row-9d9q~cdwi.4m8m" _uuid="00000000-0000-0000-A3E9-AF79BA5712E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9d9q~cdwi.4m8m"><intent_id>483672</intent_id><project_id>669073</project_id><text_data>Single Family Dwelling2 or 3 levelsPermanent Residence - yesRehabilitation house - NoTransitional housing - NoCommunal dinning facility - NoTreatment services - NoCounseling/Other - NoEach dwelling have its own self-contained kitchen - YesEach dwelling unit have its own bathroom - YesA community facility or managers office on site - YesAny part of the facility used by members of the public - No</text_data><comment_date>2011-10-25T00:00:00</comment_date></row><row _id="row-gsfg.4njg-uqyw" _uuid="00000000-0000-0000-D115-1065EBF242AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gsfg.4njg-uqyw"><intent_id>633340</intent_id><project_id>736370</project_id><text_data>&amp;quot;OTHER TRUCK&amp;quot; IS OUR WATER TANKER. UNDER 3000 GALLONS AND USED FOR DUST CONTROL ON THE PROJECT</text_data><comment_date>2014-06-05T00:00:00</comment_date></row><row _id="row-erf8.cw76~q52p" _uuid="00000000-0000-0000-D18D-EC5242C6F5FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-erf8.cw76~q52p"><intent_id>750537</intent_id><project_id>786854</project_id><text_data>302193</text_data><comment_date>2016-03-09T00:00:00</comment_date></row><row _id="row-dcf6_ayfd_zk6h" _uuid="00000000-0000-0000-8A4E-1A48DC9193A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dcf6_ayfd_zk6h"><intent_id>1103541</intent_id><project_id>940021</project_id><text_data>weatherize home, 2. single family 3. 1 or 2, 4a. no b. no c. yes d. no e. no f. no g. no h. no I. no j. no k. yes 6. yes 7. no 8. no</text_data><comment_date>2020-11-16T00:00:00</comment_date></row><row _id="row-jqvt.jbku~sd6x" _uuid="00000000-0000-0000-B495-A38E566C30BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jqvt.jbku~sd6x"><intent_id>830651</intent_id><project_id>817305</project_id><text_data>PC6 - job #6220CE</text_data><comment_date>2017-05-03T00:00:00</comment_date></row><row _id="row-3bda.wwjm_tmfb" _uuid="00000000-0000-0000-ACDB-6194E206C273" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bda.wwjm_tmfb"><intent_id>836691</intent_id><project_id>822801</project_id><text_data>Filed by Beverly Shuford.</text_data><comment_date>2017-05-26T00:00:00</comment_date></row><row _id="row-grah~qugp-6jfc" _uuid="00000000-0000-0000-750A-5415E0E6FBA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-grah~qugp-6jfc"><intent_id>846613</intent_id><project_id>824115</project_id><text_data>Oregon Workman Compensation SAIF Policy 81290</text_data><comment_date>2017-07-11T00:00:00</comment_date></row><row _id="row-bqb8-hs64-gt94" _uuid="00000000-0000-0000-198F-918DB04FC5D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bqb8-hs64-gt94"><intent_id>1317692</intent_id><project_id>1062189</project_id><text_data>Plumbing work 2. Y 3. 1 4. residence a.n b. n c. y d.n e. n f. n g. n h. n i. n j. n k. n l. n 5. y 6. y 7. n 8 n</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-ppyr-x6d9.4dgr" _uuid="00000000-0000-0000-0BAE-A08616B74EBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ppyr-x6d9.4dgr"><intent_id>1082206</intent_id><project_id>928041</project_id><text_data>Standard gutter installation</text_data><comment_date>2020-08-21T00:00:00</comment_date></row><row _id="row-isxj-mvfu~xcx9" _uuid="00000000-0000-0000-3BE5-1F9ACBE9CF76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-isxj-mvfu~xcx9"><intent_id>708496</intent_id><project_id>765189</project_id><text_data>Labor Ready is a temporary labor service provider and is therefore exempt from the requirement to obtain a contractors license.</text_data><comment_date>2015-07-20T00:00:00</comment_date></row><row _id="row-4sw8.vdw6.d85c" _uuid="00000000-0000-0000-F78D-CE0695594668" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4sw8.vdw6.d85c"><intent_id>1088199</intent_id><project_id>932704</project_id><text_data>9854406</text_data><comment_date>2020-09-15T00:00:00</comment_date></row><row _id="row-migm-fw98.r749" _uuid="00000000-0000-0000-AB42-84E0DC70DAE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-migm-fw98.r749"><intent_id>871507</intent_id><project_id>836077</project_id><text_data>Planting 630 Blue Fescue (1gal) on the six medians on the west end of the Old Redmond Road site. using hand tools</text_data><comment_date>2017-10-26T00:00:00</comment_date></row><row _id="row-efva-3sjr~9sz8" _uuid="00000000-0000-0000-912D-BA5850B8941E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efva-3sjr~9sz8"><intent_id>641488</intent_id><project_id>736264</project_id><text_data>208 ne broadway ave malden wa 99149 1. install bath fan and smart switch 2.single family home 3. 1 level 4a.no b. no c. yes d. o e. no f. no g. no h. no I. no j. no k. no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2014-07-16T00:00:00</comment_date></row><row _id="row-24t2.eb7b_kswi" _uuid="00000000-0000-0000-B3B9-D6995F69B55D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-24t2.eb7b_kswi"><intent_id>906502</intent_id><project_id>851505</project_id><text_data>Requesting a CAT6 plenum cable from the nearest MDF to the gym for a new phone. Terminate, label and cable must pass testing before job is complete.</text_data><comment_date>2018-05-23T00:00:00</comment_date></row><row _id="row-kkns_99qf~uih7" _uuid="00000000-0000-0000-E0BD-33C53DF8CA16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kkns_99qf~uih7"><intent_id>883663</intent_id><project_id>839813</project_id><text_data>604154103 - SCC BLDG 1 Teach and Learn FA</text_data><comment_date>2018-01-16T00:00:00</comment_date></row><row _id="row-p337_bytc_bfbv" _uuid="00000000-0000-0000-A5EE-001738440419" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p337_bytc_bfbv"><intent_id>986272</intent_id><project_id>884940</project_id><text_data>25th St., Bellingham, WA 982261. Air seal, attic blow, duct seal, belly blow, mechanical ventilation		2. Single family		3. 1		4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No		5. Yes		6. Yes		7. No		8. No</text_data><comment_date>2019-06-20T00:00:00</comment_date></row><row _id="row-eaem~5kmr~waf2" _uuid="00000000-0000-0000-9ECD-8AE07409358E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eaem~5kmr~waf2"><intent_id>1071091</intent_id><project_id>924921</project_id><text_data>471329, 471330, 472129, 472133, 472134, 472135, 472769, 473546</text_data><comment_date>2020-07-09T00:00:00</comment_date></row><row _id="row-nj93.upwb-r66x" _uuid="00000000-0000-0000-233E-5482AAB2CBC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nj93.upwb-r66x"><intent_id>614020</intent_id><project_id>728185</project_id><text_data>TELECOMMUNICATION TECHNICIANS WORK DESCRIPTIONProvide and install network and telephone cable between instruments, terminals and sets and the connections to the distribution cable.Provide and install Blocks and Subpanels where large feed cables terminate at the distribution frames in the IDF or MDFProvide and install riser cables between floors from the MDF to the IDFLabel and test the cableINDOOR INSTALLATION</text_data><comment_date>2014-01-28T00:00:00</comment_date></row><row _id="row-jwpr.vd2t-qhj7" _uuid="00000000-0000-0000-25BE-37533D1221F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jwpr.vd2t-qhj7"><intent_id>1153179</intent_id><project_id>966979</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2021-06-16T00:00:00</comment_date></row><row _id="row-fbf4_ijup-qeii" _uuid="00000000-0000-0000-11AD-1A2C8DC924E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fbf4_ijup-qeii"><intent_id>948860</intent_id><project_id>867841</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Demo Kitchen and Bathroom cabinets and countertops, Install new Kitchen and Bathroom cabinets and countertops. Remove bathroom exhaust fan and replace with Panasonic whispersSense FV-0511VQC1, Demo 3 pre hung, 4 bifold and 2 bypass interior door. Install new Demo 3 pre hung, 4 bifold and 2 bypass interior door. Install hardware .#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Clubhouse  #3 - Including any basement or garage, how many stories or levels does the structure have? 3 stories #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure?  no(b) Any retail use in the structure? no(c) Permanent residence only? yes(d) Rehabilitation house? no(e) Transitional housing? no(f) Communal dining facility? no(g) Treatment services? no(h) Assisted living services? no(I) Dormitories? no(j) Counseling? no(k) Is each room and/or bed in the structure rented separately? no(l) Other? n/a#5 - Does each dwelling unit have its own self-contained kitchen? yes#6 - Does each dwelling unit have its own bathroom? yes#7 - Is there a community facility or manager�s office on site? yes#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2018-12-04T00:00:00</comment_date></row><row _id="row-cpjt~h4ns~cpua" _uuid="00000000-0000-0000-64D1-EED568DDDCF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cpjt~h4ns~cpua"><intent_id>1219214</intent_id><project_id>993617</project_id><text_data>Delivery of standard, non-custom material only, load and unload by hand. Laborer-General - Lift, carry and hold material and spreads to the specific locations throughout the site</text_data><comment_date>2022-03-19T00:00:00</comment_date></row><row _id="row-5fn9_skn8.t982" _uuid="00000000-0000-0000-9AC8-E1651CF6CA6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fn9_skn8.t982"><intent_id>1112257</intent_id><project_id>944885</project_id><text_data>No work performed.  Programming and commissioning to update HVAC controls system.  No tools will be used.  Only a computer will be used to complete work.</text_data><comment_date>2020-12-29T00:00:00</comment_date></row><row _id="row-wayx_a2sr~pn76" _uuid="00000000-0000-0000-2937-2DD91835B300" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wayx_a2sr~pn76"><intent_id>621129</intent_id><project_id>694219</project_id><text_data>Form filed by: Jeffery A Goodwin</text_data><comment_date>2014-03-20T00:00:00</comment_date></row><row _id="row-chp3-2udc-33vu" _uuid="00000000-0000-0000-65E8-C4E506A78F81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-chp3-2udc-33vu"><intent_id>1318512</intent_id><project_id>1062666</project_id><text_data>10009-4 2022</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-qxj7~mje9~pnap" _uuid="00000000-0000-0000-54AB-D067D13F41FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qxj7~mje9~pnap"><intent_id>699444</intent_id><project_id>753863</project_id><text_data>Flatbed trucks used to haul material to jobsite and on-site shuttle using truck drivers.</text_data><comment_date>2015-06-09T00:00:00</comment_date></row><row _id="row-rkwz~9v3v.uafi" _uuid="00000000-0000-0000-D51D-92581F55BE6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rkwz~9v3v.uafi"><intent_id>676870</intent_id><project_id>733063</project_id><text_data>Fringe Benefits:  Pen/Annuity = $14.70   Health/Welfare = $6.77   Apprentice/etc. = $0.91  TOTAL:  $22.38</text_data><comment_date>2015-01-28T00:00:00</comment_date></row><row _id="row-imaj_ddum_byc9" _uuid="00000000-0000-0000-C979-02EA673F2B83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imaj_ddum_byc9"><intent_id>492455</intent_id><project_id>679505</project_id><text_data>Sent e-mail: Be advised that our current processing method for on-call types of service contracts is to require that the contractor and each and every subcontractor file an Intent for their first work under the contract (for instance the first call-out for the contractor).  To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  In addition, if you are acting at the prime contractor, you must ensure that all subcontractors follow the outlined procedures.Please be sure to follow this process to avoid delay in form approval and payment based on that approval.  (RCW 39.12.040)  In addition, we recommend that you sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all listserve members.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.aspI also wanted to address the notes you provided on your Intent that described potential work that will be performed under this on-call service agreement.  In particular, I wanted to provide you with a recent determination from the Industrial Statistician regarding the use of Electronic Technicians for specific HVAC control work.  A link to that December 14, 2011, letter is provided below. I also wanted to clarify that if your firm does work upon fire protection systems, such work may fall within the Sprinkler Fitter (WAC 296-127-01375) classification.  Sprinkler Fitters perform the installation, adjustments and corrections, maintenance, repair and dismantling of all fire protection and fire control systems including CO2 and cardox systems, dry chemical systems, halon and foam systems and all other fire protection systems.  This includes fire extinguishers.  Along with the links to the applicable scope of work, I have provided a link to our policy letter relating to Sprinkler Fitter work.http://apps.leg.wa.gov/WAC/default.aspx?cite=296-127-01375http://www.lni.wa.gov/TradesLicensing/PrevWage/files/Policies/FireExtinguishers-SprinklerFittersFinalPolicy.pdfIf you have any questions, please contact me.</text_data><comment_date>2011-12-28T00:00:00</comment_date></row><row _id="row-pz56.ri2p_z6xj" _uuid="00000000-0000-0000-4D67-5AD6AC854AFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pz56.ri2p_z6xj"><intent_id>820946</intent_id><project_id>813325</project_id><text_data>077018</text_data><comment_date>2017-03-15T00:00:00</comment_date></row><row _id="row-zc4f_egs5~qbnb" _uuid="00000000-0000-0000-357E-4A2EEC5AF6C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zc4f_egs5~qbnb"><intent_id>565901</intent_id><project_id>709428</project_id><text_data>Weatherization work at two private residences.</text_data><comment_date>2013-04-22T00:00:00</comment_date></row><row _id="row-gvqy.8pg8_84tw" _uuid="00000000-0000-0000-ABBF-BFE6BDD48242" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gvqy.8pg8_84tw"><intent_id>835971</intent_id><project_id>822519</project_id><text_data>Service performed will be on commercial foodservice equipment.</text_data><comment_date>2017-05-24T00:00:00</comment_date></row><row _id="row-44gb~wpud.crjj" _uuid="00000000-0000-0000-2632-880D6870FDF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-44gb~wpud.crjj"><intent_id>947904</intent_id><project_id>867432</project_id><text_data>Dan Stewart - PEO Vactor/Guzzler</text_data><comment_date>2018-11-28T00:00:00</comment_date></row><row _id="row-7fv7~pctv~dekv" _uuid="00000000-0000-0000-D68B-E9B4DFFD79D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7fv7~pctv~dekv"><intent_id>578424</intent_id><project_id>714496</project_id><text_data>Install communications cabling on the fourth and fifth floors.Work on the communication systems.All work to be performed indoors.</text_data><comment_date>2013-06-28T00:00:00</comment_date></row><row _id="row-7tkz-rapm-ui7u" _uuid="00000000-0000-0000-6DCD-AB371C55C39D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7tkz-rapm-ui7u"><intent_id>756222</intent_id><project_id>788885</project_id><text_data>Filed by Vivian Hurd</text_data><comment_date>2016-04-12T00:00:00</comment_date></row><row _id="row-vkrn~ift7-hrwf" _uuid="00000000-0000-0000-9A28-A9F4AAB1585E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkrn~ift7-hrwf"><intent_id>1086878</intent_id><project_id>932137</project_id><text_data>Other Trucks: Work truck or Box truck to haul equipment.</text_data><comment_date>2020-09-10T00:00:00</comment_date></row><row _id="row-xmqy_9h34-k47m" _uuid="00000000-0000-0000-A7F2-99411E675311" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xmqy_9h34-k47m"><intent_id>638812</intent_id><project_id>738489</project_id><text_data>System Type:  LAN  Telecom Tech (09) Replace Patch Panels and jacks.    Work to be performed indoors.</text_data><comment_date>2014-07-02T00:00:00</comment_date></row><row _id="row-w7jr~9e8c-477z" _uuid="00000000-0000-0000-1B74-71914219E743" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w7jr~9e8c-477z"><intent_id>870689</intent_id><project_id>835742</project_id><text_data>Filed by J Gregory Shaffer</text_data><comment_date>2017-10-23T00:00:00</comment_date></row><row _id="row-yu2k~zxmk-n3rb" _uuid="00000000-0000-0000-2B1B-77AC65E1FDBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yu2k~zxmk-n3rb"><intent_id>866839</intent_id><project_id>834174</project_id><text_data>The subcontractor&amp;#39;s duties for this project were to bring playground material in their truck to the facility where everything was marked and ready for their guy to dump the product on the playground where they were told to.</text_data><comment_date>2017-10-04T00:00:00</comment_date></row><row _id="row-wgb4-fzeq-i6ne" _uuid="00000000-0000-0000-CD23-2EAA8FCE38F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wgb4-fzeq-i6ne"><intent_id>803677</intent_id><project_id>807789</project_id><text_data>Customer #30438, multiple contracts for labor from 9/1/2016 thru 8/31/2017</text_data><comment_date>2016-11-21T00:00:00</comment_date></row><row _id="row-nnmc-at88_734x" _uuid="00000000-0000-0000-F16E-AD34D08FAF05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nnmc-at88_734x"><intent_id>532770</intent_id><project_id>695355</project_id><text_data>12-H081</text_data><comment_date>2012-09-05T00:00:00</comment_date></row><row _id="row-x5ga_25g8.6hbr" _uuid="00000000-0000-0000-42AC-A37CFC2CB8E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x5ga_25g8.6hbr"><intent_id>1253581</intent_id><project_id>1024255</project_id><text_data>Fringes: Vacation $4.00, Assessment $1.30, Insurance $9.46, Pension $16.55, Training $1.63, Industry Improvement $.50</text_data><comment_date>2022-07-29T00:00:00</comment_date></row><row _id="row-g39b_zs57-rkk3" _uuid="00000000-0000-0000-B520-0007668754AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g39b_zs57-rkk3"><intent_id>731173</intent_id><project_id>739369</project_id><text_data>Fringe Breakdown:$15.19---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $8.19 Pension</text_data><comment_date>2015-11-11T00:00:00</comment_date></row><row _id="row-8n6x-hhjn_9ct7" _uuid="00000000-0000-0000-181F-2903749B9353" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8n6x-hhjn_9ct7"><intent_id>1073457</intent_id><project_id>926013</project_id><text_data>9851252</text_data><comment_date>2020-07-20T00:00:00</comment_date></row><row _id="row-g8gk-r4as~6zvc" _uuid="00000000-0000-0000-6624-EB321AEC72D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8gk-r4as~6zvc"><intent_id>542900</intent_id><project_id>699045</project_id><text_data>Job # 916506</text_data><comment_date>2012-11-02T00:00:00</comment_date></row><row _id="row-6ia9-xcrr_giec" _uuid="00000000-0000-0000-5826-E94546C8E2D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ia9-xcrr_giec"><intent_id>1012628</intent_id><project_id>892980</project_id><text_data>Stella Falk, 1111 Archwood Dr SW #289, Olympia, WA  Kristena Futton  2805 76th Ave SE #5, Olympia, WAAndrea Weathers, 11441 Riverside Dr SE, Olympia, WA</text_data><comment_date>2019-10-07T00:00:00</comment_date></row><row _id="row-7sbi_g2ys~x4eb" _uuid="00000000-0000-0000-7950-28D951BDCDC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7sbi_g2ys~x4eb"><intent_id>766803</intent_id><project_id>769052</project_id><text_data>Installation of Planting and Irrigation for Beautification</text_data><comment_date>2016-06-07T00:00:00</comment_date></row><row _id="row-tu6k~bdwf-62q7" _uuid="00000000-0000-0000-3030-AE07A0830F81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tu6k~bdwf-62q7"><intent_id>1197431</intent_id><project_id>990541</project_id><text_data>Work due June 22 and November 2022</text_data><comment_date>2021-12-07T00:00:00</comment_date></row><row _id="row-xswx.5xk7.kvtm" _uuid="00000000-0000-0000-6599-EF1255C4915D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xswx.5xk7.kvtm"><intent_id>833164</intent_id><project_id>820799</project_id><text_data>MMCI #17-210</text_data><comment_date>2017-05-16T00:00:00</comment_date></row><row _id="row-dswb_m6xn~vihj" _uuid="00000000-0000-0000-7725-3C6D2000924D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dswb_m6xn~vihj"><intent_id>778479</intent_id><project_id>798342</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2016-07-28T00:00:00</comment_date></row><row _id="row-kzmf-bttz_udnf" _uuid="00000000-0000-0000-51CB-0C6BFBA8B3DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kzmf-bttz_udnf"><intent_id>951765</intent_id><project_id>869160</project_id><text_data>#20251, Bostrom-Vaughn, Lleanorna, 221 W Carlisle, Spokane</text_data><comment_date>2019-01-08T00:00:00</comment_date></row><row _id="row-pndv-m5e3.gmpj" _uuid="00000000-0000-0000-4C98-22B229C4FAD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pndv-m5e3.gmpj"><intent_id>559106</intent_id><project_id>705197</project_id><text_data>Owner may perform work as Glazier on this project.</text_data><comment_date>2013-03-07T00:00:00</comment_date></row><row _id="row-5vpq~hyye~ahic" _uuid="00000000-0000-0000-00BC-CD2CB4E5D527" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vpq~hyye~ahic"><intent_id>857873</intent_id><project_id>830700</project_id><text_data>In order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2- Single Family3-1-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- nok- no6- no7- no8- no212 SW 146th - Chantorn, Sue</text_data><comment_date>2017-08-23T00:00:00</comment_date></row><row _id="row-w6gs_cj2w~2stc" _uuid="00000000-0000-0000-B309-90B70FAAEF57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w6gs_cj2w~2stc"><intent_id>1036390</intent_id><project_id>822014</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2020-02-05T00:00:00</comment_date></row><row _id="row-4hs7.tft5.8hqh" _uuid="00000000-0000-0000-DCFB-397964B65288" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4hs7.tft5.8hqh"><intent_id>1197655</intent_id><project_id>982980</project_id><text_data>Motor Patroll Grader is used for Vac Truck Operator</text_data><comment_date>2021-12-07T00:00:00</comment_date></row><row _id="row-zkc5~t73d.hzq2" _uuid="00000000-0000-0000-13C9-064FC3E711C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zkc5~t73d.hzq2"><intent_id>604161</intent_id><project_id>715848</project_id><text_data>pacific mobile structures inc 600498022 to american electric inc 601634684 to simplexgrinnell 602113334broadway elementary 92521901</text_data><comment_date>2013-11-12T00:00:00</comment_date></row><row _id="row-y55f-sju4-59k8" _uuid="00000000-0000-0000-D7FF-9D820683F044" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y55f-sju4-59k8"><intent_id>778344</intent_id><project_id>797378</project_id><text_data>Wages paid are $70.14 per hour</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-zs7p.fdqg-deh9" _uuid="00000000-0000-0000-3AE6-3A2CA49EB6A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zs7p.fdqg-deh9"><intent_id>1015025</intent_id><project_id>896053</project_id><comment_date>2019-10-13T00:00:00</comment_date></row><row _id="row-x5jn.und2.7rv4" _uuid="00000000-0000-0000-CABD-F6F1415C6144" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x5jn.und2.7rv4"><intent_id>1029933</intent_id><project_id>903628</project_id><text_data>Annual test and inspection of the fire alarm systems and the sprinklers systems at the lower Columbia college campus, testing response time from smoke detector to panel/ sprinkler to panel. all work was performed indoors at numerous different rooms in the campus</text_data><comment_date>2020-01-23T00:00:00</comment_date></row><row _id="row-4fmv_tmiz_9efr" _uuid="00000000-0000-0000-81FE-ECB70C961718" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4fmv_tmiz_9efr"><intent_id>1149251</intent_id><project_id>964849</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2021-06-15T00:00:00</comment_date></row><row _id="row-xkq5_yuqs_gbfy" _uuid="00000000-0000-0000-60C3-1542EDD491E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xkq5_yuqs_gbfy"><intent_id>807379</intent_id><project_id>809453</project_id><text_data>A) Installing 11 new light poles and bases with new conduit to each base. City crews are doing all demo of existing lighting structures. B)Excavation and backfill of conduit runs and light pole bases. Subcontractor will be doing all the electrical work. C) Laborer will be hand excavating where required and smoothing off the backfill dirt and cleanup work. Owners will be running all equipment.</text_data><comment_date>2016-12-20T00:00:00</comment_date></row><row _id="row-r5i5~6qes_zksj" _uuid="00000000-0000-0000-CFEC-B7DBAAFDB68B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5i5~6qes_zksj"><intent_id>1143867</intent_id><project_id>957166</project_id><text_data>1) residing of existing structures2) apartments3) 34) a -no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-yes, l-no5) yes6) yes7) no8) no</text_data><comment_date>2021-05-12T00:00:00</comment_date></row><row _id="row-gejj~i2sa.ik6h" _uuid="00000000-0000-0000-E46F-1820A2C3D163" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gejj~i2sa.ik6h"><intent_id>698406</intent_id><project_id>763931</project_id><text_data>Form filed by:  Gary Lohman</text_data><comment_date>2015-06-04T00:00:00</comment_date></row><row _id="row-6js3_bgnx~fm6k" _uuid="00000000-0000-0000-B8F7-7D59EF2A62CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6js3_bgnx~fm6k"><intent_id>928677</intent_id><project_id>859833</project_id><text_data>01-JO02-JM03-BS</text_data><comment_date>2018-08-27T00:00:00</comment_date></row><row _id="row-f4hf-h2hr-mmdc" _uuid="00000000-0000-0000-175B-EFDD4E36D18D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f4hf-h2hr-mmdc"><intent_id>952717</intent_id><project_id>846230</project_id><text_data>Installing Approx 80 feet of concrete curbing</text_data><comment_date>2018-12-30T00:00:00</comment_date></row><row _id="row-fs2k.e3ht.yy9y" _uuid="00000000-0000-0000-4CDE-273DCCC3E648" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fs2k.e3ht.yy9y"><intent_id>690752</intent_id><project_id>760683</project_id><text_data>Remove existing shrubs from planting bed. Install new plant material. Plants removed/installed using hand tools</text_data><comment_date>2015-04-23T00:00:00</comment_date></row><row _id="row-cnr4-2uez_p9ib" _uuid="00000000-0000-0000-29A6-2362D5735F27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cnr4-2uez_p9ib"><intent_id>1144875</intent_id><project_id>962479</project_id><text_data>FRINGE BENEFTIS PER HOUR INCLUDE: HEALTH, WELFARE, DENTAL - 9.01; WA PENSION - 3.50; NATIONAL PENSION - 0.76; INT'L TRAINING -0.10; IND IMPR - 0.50; JATC -1.90; SUPP PF - 2.94; HOURLY WAGE INCLUDES $2 VACATION</text_data><comment_date>2021-05-14T00:00:00</comment_date></row><row _id="row-gh8x-ah5p~jcq9" _uuid="00000000-0000-0000-3725-1D6F907C2F2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gh8x-ah5p~jcq9"><intent_id>718152</intent_id><project_id>771331</project_id><text_data>The product being installed is a resinous urethane material that is mixed in plastic buckets and poured onto the existing surface and leveled with trowels. Game lines are then painted on the floor on using rollers.</text_data><comment_date>2015-09-09T00:00:00</comment_date></row><row _id="row-hzpj.g4s9.y2d2" _uuid="00000000-0000-0000-C59D-09A1074FB330" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hzpj.g4s9.y2d2"><intent_id>656730</intent_id><project_id>745213</project_id><text_data>remove and dispose of approximately 400SF of asbestos containing floor tile</text_data><comment_date>2014-09-24T00:00:00</comment_date></row><row _id="row-2b5p~uzeb_jmfk" _uuid="00000000-0000-0000-C1E8-9316DE096DA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2b5p~uzeb_jmfk"><intent_id>589126</intent_id><project_id>717816</project_id><text_data>Track surface on Long Jump Runway</text_data><comment_date>2013-08-21T00:00:00</comment_date></row><row _id="row-nusr-dha3~73nc" _uuid="00000000-0000-0000-5EF8-66951FCF49DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nusr-dha3~73nc"><intent_id>771447</intent_id><project_id>795691</project_id><text_data>PTI SO#127326</text_data><comment_date>2016-06-28T00:00:00</comment_date></row><row _id="row-wht2~vcea-z4ua" _uuid="00000000-0000-0000-A6B1-3B225972D827" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wht2~vcea-z4ua"><intent_id>1215984</intent_id><project_id>1002429</project_id><text_data>Invoice 910007-00 / Labor SRO 1915438</text_data><comment_date>2022-03-07T00:00:00</comment_date></row><row _id="row-p57v-j3rj-hwc8" _uuid="00000000-0000-0000-DFDD-1FB57A1B899D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p57v-j3rj-hwc8"><intent_id>906186</intent_id><project_id>851372</project_id><text_data>1. On-call emergency electrical repairs. 2. single family dwelling 3. not more than 3 stories 4. a. no b. no c. yes d. no e. no f. no g. no h. no I. no j. no k. no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2018-05-22T00:00:00</comment_date></row><row _id="row-2t44_5hhy_6iuw" _uuid="00000000-0000-0000-B4AC-ECB65B264278" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2t44_5hhy_6iuw"><intent_id>757861</intent_id><project_id>730869</project_id><text_data>a) the full project details are revision and restoration of WPCF.b) our portion of the project is to install hydroseed per specifications on designated and prepared areas using a hydroseed installation truck. Hydroseed is a one-step process.</text_data><comment_date>2016-04-21T00:00:00</comment_date></row><row _id="row-ct8u-dxx4.z6tz" _uuid="00000000-0000-0000-54DE-D4A4761544AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ct8u-dxx4.z6tz"><intent_id>654148</intent_id><project_id>744235</project_id><text_data>I will separate out the three locations/projects.</text_data><comment_date>2014-09-18T00:00:00</comment_date></row><row _id="row-ney9-9jij~4wcr" _uuid="00000000-0000-0000-599D-E5BDC063F1E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ney9-9jij~4wcr"><intent_id>1128871</intent_id><project_id>954333</project_id><text_data>There is a minimum charge of 2 hrs for each employee</text_data><comment_date>2021-03-15T00:00:00</comment_date></row><row _id="row-y3zu~mmyq~itj9" _uuid="00000000-0000-0000-55AD-778F08A9606B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y3zu~mmyq~itj9"><intent_id>817912</intent_id><project_id>800815</project_id><text_data>�	A) Please describe the whole project � not just your part.   The project description and data consists of the demolition of existing 20-unit student housing apartments and construction of a 4 story (plus 1 basement level below) building containing 39 residential units, 132 beds for student housing for the Everett Community College Students.  �	B) Please describe your part(s) of the project. Our part consists of the installation of a single ply roofing system (60 mil TPO mechanically attached over a 1/4&amp;quot; densdeck coverboad.   �	C) Please specifically describe the duties being performed by the General Laborers and any tools, equipment, or vehicles used. The duties performed by our laborers include loading and offloading of materials from the ground to the roof and vice versa by means of stairways and in some cases with the assistance of a reach forklift provided by others.   Other tasks include removal of lumber, debris, snow, ponded moisture/water due to rain, or any other items placed on the roof deck prior to the duties as described in paragraph B above.</text_data><comment_date>2017-03-02T00:00:00</comment_date></row><row _id="row-jgqu_35cx-pjeu" _uuid="00000000-0000-0000-BE55-BBF8B5A81188" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgqu_35cx-pjeu"><intent_id>585082</intent_id><project_id>716351</project_id><text_data>Our scope of work is to install an automatic irrigation system, plant sod and trees and shrubs.  Equipment used will be walk behind trencher machine as well as various hand tools.  Irrigation trenches to be 12-18&amp;quot; depth.</text_data><comment_date>2013-08-01T00:00:00</comment_date></row><row _id="row-enc6~g9u8_6egy" _uuid="00000000-0000-0000-0B73-14FB50BB21EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-enc6~g9u8_6egy"><intent_id>1063030</intent_id><project_id>895659</project_id><text_data>Installation and testing of Distributed Antenna System.  This will be done inside the building located at 23920 32nd Ave S, Kent WA  98032.  Installation of cables, antennas and related equipment.</text_data><comment_date>2020-06-05T00:00:00</comment_date></row><row _id="row-nrjy_fnv4~ss4v" _uuid="00000000-0000-0000-83AD-C821CE9B80C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrjy_fnv4~ss4v"><intent_id>965712</intent_id><project_id>875811</project_id><text_data>WO #95333291</text_data><comment_date>2019-03-18T00:00:00</comment_date></row><row _id="row-56re-cxex~absh" _uuid="00000000-0000-0000-9F0E-4F06C1E75683" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-56re-cxex~absh"><intent_id>1063169</intent_id><project_id>921429</project_id><text_data>353184</text_data><comment_date>2020-06-08T00:00:00</comment_date></row><row _id="row-iwpj-2vaw-98wr" _uuid="00000000-0000-0000-15C3-EDC2A9C7A7BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iwpj-2vaw-98wr"><intent_id>1089857</intent_id><project_id>923549</project_id><text_data>Truck Driver 'Other' used for truck mounted pick up sweeper and/or 2000-4000 gallon water truck</text_data><comment_date>2020-09-21T00:00:00</comment_date></row><row _id="row-ghm7.xzgj_ga8k" _uuid="00000000-0000-0000-EDD0-4A7A9D3BB010" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ghm7.xzgj_ga8k"><intent_id>786716</intent_id><project_id>801467</project_id><text_data>removal of a 3 stem cottonwood tree</text_data><comment_date>2016-09-01T00:00:00</comment_date></row><row _id="row-x53i_65pw-8vkq" _uuid="00000000-0000-0000-F9C5-6AC5D1F7BD27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x53i_65pw-8vkq"><intent_id>625819</intent_id><project_id>733358</project_id><text_data>I have removed the landscape construction wage. Please approve the form</text_data><comment_date>2014-04-30T00:00:00</comment_date></row><row _id="row-h3xk.9wgf~whrb" _uuid="00000000-0000-0000-28C2-8B07AD732DEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h3xk.9wgf~whrb"><intent_id>816047</intent_id><project_id>813517</project_id><text_data>1) Leak repair. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f) No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) No 8) No.</text_data><comment_date>2017-02-15T00:00:00</comment_date></row><row _id="row-9uvu-tgdz-3k7d" _uuid="00000000-0000-0000-605F-72543AB0BCFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9uvu-tgdz-3k7d"><intent_id>891458</intent_id><project_id>845208</project_id><text_data>Trucks are 12 yard end dumps, truck and trailers are 24 yard end dumps for hauling asphalt, rock and road construction related items.  Other trucks are 0 � 8,000 gallon water trucks used for road construction related items.</text_data><comment_date>2018-03-06T00:00:00</comment_date></row><row _id="row-67vg.25wi.sydf" _uuid="00000000-0000-0000-B680-7A1D6F460FBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-67vg.25wi.sydf"><intent_id>626017</intent_id><project_id>733452</project_id><text_data>LR 4/22/2014JOB # 901-19</text_data><comment_date>2014-04-22T00:00:00</comment_date></row><row _id="row-4jhn_wwhs-w9ba" _uuid="00000000-0000-0000-7F0D-7F1C86EE860A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4jhn_wwhs-w9ba"><intent_id>972629</intent_id><project_id>878886</project_id><text_data>Install cables that can be used for either telephone(Voice over Distance) or data(bitsand bytes) connection within the telecommunications system. All work to be performedindoors</text_data><comment_date>2019-04-19T00:00:00</comment_date></row><row _id="row-v2qm-ehfj-5rwa" _uuid="00000000-0000-0000-2926-A81288FDFDDC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v2qm-ehfj-5rwa"><intent_id>743442</intent_id><project_id>744637</project_id><text_data>Install irrigation system and water meter.</text_data><comment_date>2016-01-26T00:00:00</comment_date></row><row _id="row-w74k~xkz4_ihjq" _uuid="00000000-0000-0000-22F1-57DA00BEEE96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w74k~xkz4_ihjq"><intent_id>818730</intent_id><project_id>814687</project_id><text_data>Cedar House is a Four-Plex. Each unit has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The building is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing a new hyper heat ducted system to replace existing electric furnace. The crew will also be installing new bathroom fans and lighting. This job meets the residential job requirements.</text_data><comment_date>2017-03-02T00:00:00</comment_date></row><row _id="row-ssk7.natg-t4hk" _uuid="00000000-0000-0000-CF4B-0B77A5C0B34E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ssk7.natg-t4hk"><intent_id>690800</intent_id><project_id>758385</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2015-04-24T00:00:00</comment_date></row><row _id="row-9tju~6g9i.6ga3" _uuid="00000000-0000-0000-2B95-21057CDE2D3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9tju~6g9i.6ga3"><intent_id>956712</intent_id><project_id>871516</project_id><text_data>DEI Job D005016</text_data><comment_date>2019-01-24T00:00:00</comment_date></row><row _id="row-2egc_4gvx.wxzk" _uuid="00000000-0000-0000-F1E3-FB2C6C79CDBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2egc_4gvx.wxzk"><intent_id>762510</intent_id><project_id>792155</project_id><text_data>Remove existing sink cabinet, replace floor, and put sink cabinet back.  Pry bars, screwdrivers, putty knives, floor scrapers, glue applicators, welding rods will be used.</text_data><comment_date>2016-05-17T00:00:00</comment_date></row><row _id="row-tzmf~qgyt~e4we" _uuid="00000000-0000-0000-89E0-1F812362B534" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzmf~qgyt~e4we"><intent_id>1197630</intent_id><project_id>990636</project_id><text_data>sr50795938</text_data><comment_date>2021-12-07T00:00:00</comment_date></row><row _id="row-tx5e.fqjy~cwkq" _uuid="00000000-0000-0000-1F7F-B4947D124B68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tx5e.fqjy~cwkq"><intent_id>1177614</intent_id><project_id>979329</project_id><text_data>Covid Cleaning</text_data><comment_date>2021-09-15T00:00:00</comment_date></row><row _id="row-2ger-nfbq.dtfm" _uuid="00000000-0000-0000-DC0B-E154502796B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ger-nfbq.dtfm"><intent_id>806025</intent_id><project_id>808835</project_id><text_data>Glycol was put into Sprinkler System so Sprinkler System doesn&amp;#39;t freeze during winter months</text_data><comment_date>2016-12-14T00:00:00</comment_date></row><row _id="row-m4as-v5q7_36aw" _uuid="00000000-0000-0000-9EC4-F631499D475E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m4as-v5q7_36aw"><intent_id>887069</intent_id><project_id>837236</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2018-02-07T00:00:00</comment_date></row><row _id="row-begx~6n7e.4zfy" _uuid="00000000-0000-0000-CE3B-C20FEA740B7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-begx~6n7e.4zfy"><intent_id>509761</intent_id><project_id>686791</project_id><text_data>Health &amp; Welfare - $7.23, Pension Fund - $9.48, Retirement - $3.41, NEBF/Union - $2.00</text_data><comment_date>2012-04-30T00:00:00</comment_date></row><row _id="row-5a9p_cjzu~hnpu" _uuid="00000000-0000-0000-AAA3-455F7D4010C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5a9p_cjzu~hnpu"><intent_id>720373</intent_id><project_id>760675</project_id><text_data>Scope of work: Bridge repairs for seismic upgrades.Our scope of work: replant .02 acres of impacted wetlands due to bridge repair for seismic upgrades to bridge. hand digging planting hole to maximum depth and width of 10 inches, plant 3600 1 gallon native plants.Tools to be used : shovels, rakes, wheelbarrows</text_data><comment_date>2015-09-14T00:00:00</comment_date></row><row _id="row-nj8n-rskc~5xpg" _uuid="00000000-0000-0000-CB8F-DFE35FE72E90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nj8n-rskc~5xpg"><intent_id>492370</intent_id><project_id>679481</project_id><text_data>Vac Truck</text_data><comment_date>2011-12-07T00:00:00</comment_date></row><row _id="row-5h8q~6f5c~8yns" _uuid="00000000-0000-0000-0C83-0C5988F6378F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5h8q~6f5c~8yns"><intent_id>1255161</intent_id><project_id>1025112</project_id><text_data>sr51895414</text_data><comment_date>2022-08-04T00:00:00</comment_date></row><row _id="row-cxbh.fwyy-w28e" _uuid="00000000-0000-0000-CA24-32312A8B8DB0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxbh.fwyy-w28e"><intent_id>944743</intent_id><project_id>866029</project_id><text_data>Job Order Contract Lake Washington School District No. 414Purchase Order No. 2000402877CCE 73880-0015</text_data><comment_date>2018-11-08T00:00:00</comment_date></row><row _id="row-2exb-thb2.rume" _uuid="00000000-0000-0000-B7DD-70B22D18B3FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2exb-thb2.rume"><intent_id>1217602</intent_id><project_id>1003456</project_id><text_data>2022 Inside JW Electrician - Wage $53.85; District 9 $5.02; Edison Pension $9.10; NEBF $1.62; Health &amp; Welfare $10.00; Flex $1.30; Apprenticeship $.80; BLMCC $.20 (total fringe $28.04) Total $81.89</text_data><comment_date>2022-03-14T00:00:00</comment_date></row><row _id="row-pky6-ys5n.rv86" _uuid="00000000-0000-0000-617F-77621F4B7044" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pky6-ys5n.rv86"><intent_id>1277572</intent_id><project_id>1036924</project_id><text_data>#1 - Urgent request to fix a bad shower valve/diverter leak. #2 - duplex #3 - one #4 -  (a) no (b) no (c) yes (d) no (e) no (f) no (g) no (h) no (I) no (j) no (k) no (l) no #5 - yes #6 - yes #7 - no #8 � no</text_data><comment_date>2022-10-25T00:00:00</comment_date></row><row _id="row-fffi.p6mb~7ukh" _uuid="00000000-0000-0000-25F7-28A997B0CD8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fffi.p6mb~7ukh"><intent_id>573767</intent_id><project_id>703655</project_id><text_data>Erosion control workers will be installing and removing silt fence, barrier fence, inlet protection, and straw waddles,Landscape construction workers will be planting plant material at the quil ceda caino parking lot after imco construction installs the waterpipeline. They will also add 2-3 inches of bark mulch. They will install sod in all disturbed lawn areas. Topsoil installation is excluded from our contract and will be installed by others.</text_data><comment_date>2013-06-27T00:00:00</comment_date></row><row _id="row-w76v_vsm7_i9n8" _uuid="00000000-0000-0000-EA97-CC37B929A292" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w76v_vsm7_i9n8"><intent_id>491182</intent_id><project_id>670710</project_id><text_data>TRUCK DRIVER OTHER IS USED FOR TRUCK MOUNTED PICKUP SWEEPER</text_data><comment_date>2011-11-29T00:00:00</comment_date></row><row _id="row-icq8_zp25-qekd" _uuid="00000000-0000-0000-048D-0F5C9F21E075" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-icq8_zp25-qekd"><intent_id>622145</intent_id><project_id>731814</project_id><text_data>INSTALL DUPLEX RECEPTACLE POWER, VGA AND HDMI CABLE FROM FLAT SCREEN MONITOR TO ADMINISTRATORS OFFICE.( 113-2802)</text_data><comment_date>2014-03-27T00:00:00</comment_date></row><row _id="row-82wd-5fhj~jrn4" _uuid="00000000-0000-0000-61F8-5FCB27FAD5CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-82wd-5fhj~jrn4"><intent_id>1023871</intent_id><project_id>892637</project_id><text_data>Juan Ozuna2174 W May St.Othello, WA 99344</text_data><comment_date>2019-11-26T00:00:00</comment_date></row><row _id="row-6r49~3gwe-cihz" _uuid="00000000-0000-0000-9240-B4D81EAAC8BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6r49~3gwe-cihz"><intent_id>740910</intent_id><project_id>772378</project_id><text_data>Tim Jones921 Queen AveYakima, WA 98902#1 Install Bath fan/light combo &amp; J-boxes for open splices #2 Single Family dwelling #3 unknown story BLDG #4(a)no (b)no (c)yes (d)no (e)no (f)no (g)no (h)no (i)no (j)no(k)no #5 1 family dwelling kitchen #6 1 family dwelling bathroom #7 no places #8 no public use.</text_data><comment_date>2016-01-09T00:00:00</comment_date></row><row _id="row-2tr6~sgry_n9an" _uuid="00000000-0000-0000-AFED-ECFC2F1EA7F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tr6~sgry_n9an"><intent_id>810818</intent_id><project_id>811079</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Graffiti removal #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Yes #3 - Including any basement or garage, how many stories or levels does the structure have? 1-3 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no (b) Any retail use in the structure? No (c) Permanent residence only? yes (d) Rehabilitation house? no (e) Transitional housing? no (f) Communal dining facility? no (g) Treatment services? no (h) Assisted living services? no (i) Dormitories? no (j) Counseling? no (k) Is each room and/or bed in the structure rented separately? no (l) Other services or uses? No #5 - Does each dwelling unit have its own self-contained kitchen? yes #6 - Does each dwelling unit have its own bathroom? Yes #7 - Is there a community facility or manager�s office on site? Sometimes#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2017-01-11T00:00:00</comment_date></row><row _id="row-srv6~ep5r-guy7" _uuid="00000000-0000-0000-64E9-308CD253E89B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-srv6~ep5r-guy7"><intent_id>919509</intent_id><project_id>855099</project_id><text_data>General labor work consists of hand work (shovel work) Blade operator is used for grading the project site for compaction before paving or chip sealing. Other trucks consists of the following: 1) one (1) 0-8,000 gallon water truck used for watering the project site to help with compaction 2) oil distributor used for distribution of oil during chip sealing operations.</text_data><comment_date>2018-07-19T00:00:00</comment_date></row><row _id="row-dsiu.ppn2~s6zd" _uuid="00000000-0000-0000-FE36-10D56B35B08C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dsiu.ppn2~s6zd"><intent_id>1508321</intent_id><project_id>1169653</project_id><text_data>#1 � The crew will be repairing the sewer line#2 - Singe-Family #3 � 2-Stories or Less #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2025-02-10T00:00:00</comment_date></row><row _id="row-67vf.saf2.3qye" _uuid="00000000-0000-0000-ED16-FC2FEE861A16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-67vf.saf2.3qye"><intent_id>497033</intent_id><project_id>681446</project_id><text_data>Sent email:  On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2013-01-31T00:00:00</comment_date></row><row _id="row-axwj~tqrm~dkcm" _uuid="00000000-0000-0000-9CFF-B2D11EF92DF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-axwj~tqrm~dkcm"><intent_id>991545</intent_id><project_id>887086</project_id><text_data>Filed by Jim Consolo</text_data><comment_date>2019-07-12T00:00:00</comment_date></row><row _id="row-r5xe~7gc9_9sia" _uuid="00000000-0000-0000-EAEC-09284AF0CF64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5xe~7gc9_9sia"><intent_id>806275</intent_id><project_id>808953</project_id><text_data>Jw wage 40.30Pension 8.00h&amp;W 9.08app training .60admin fund .30lmcc.10nlmcc .01nebf 1.21</text_data><comment_date>2016-12-08T00:00:00</comment_date></row><row _id="row-ine2~rh29-asf4" _uuid="00000000-0000-0000-632E-70A4F64C3CA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ine2~rh29-asf4"><intent_id>512934</intent_id><project_id>684338</project_id><text_data>Disregard labor notes from earlier</text_data><comment_date>2012-05-21T00:00:00</comment_date></row><row _id="row-ywfd.ukiu_9uhp" _uuid="00000000-0000-0000-0F25-2AD55169C93C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ywfd.ukiu_9uhp"><intent_id>702808</intent_id><project_id>725608</project_id><text_data>Contract No is #7311</text_data><comment_date>2015-06-23T00:00:00</comment_date></row><row _id="row-y5tm~7ydb_pyy6" _uuid="00000000-0000-0000-C3FA-870B85387B94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5tm~7ydb_pyy6"><intent_id>897714</intent_id><project_id>847102</project_id><text_data>3000647</text_data><comment_date>2018-04-10T00:00:00</comment_date></row><row _id="row-r3cp_uwqh-ivss" _uuid="00000000-0000-0000-7E3D-5BD4C5E6EF92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r3cp_uwqh-ivss"><intent_id>996622</intent_id><project_id>889077</project_id><text_data>1904-0277</text_data><comment_date>2019-08-02T00:00:00</comment_date></row><row _id="row-aecp.xg9b-rvtf" _uuid="00000000-0000-0000-25F4-386D36B6D4CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aecp.xg9b-rvtf"><intent_id>795046</intent_id><project_id>798979</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER</text_data><comment_date>2016-10-11T00:00:00</comment_date></row><row _id="row-pyf3~8v47.nqqe" _uuid="00000000-0000-0000-436A-D595663FD953" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pyf3~8v47.nqqe"><intent_id>583984</intent_id><project_id>714400</project_id><text_data>Heavy haul trucks hauling concrete bridge girders with steer trailers.</text_data><comment_date>2013-07-29T00:00:00</comment_date></row><row _id="row-n33y_3hva_9rnu" _uuid="00000000-0000-0000-5046-D968B125DADB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n33y_3hva_9rnu"><intent_id>689464</intent_id><project_id>760129</project_id><text_data>301955</text_data><comment_date>2015-04-16T00:00:00</comment_date></row><row _id="row-3vr3-w8s7.i5ei" _uuid="00000000-0000-0000-ADBD-0BF855B595ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vr3-w8s7.i5ei"><intent_id>1078323</intent_id><project_id>928191</project_id><text_data>Blythe job X-511</text_data><comment_date>2020-08-06T00:00:00</comment_date></row><row _id="row-inqt.bxcw.twgw" _uuid="00000000-0000-0000-2AC6-844E89D73DF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inqt.bxcw.twgw"><intent_id>1103787</intent_id><project_id>940147</project_id><text_data>Installation of (1) 6-Strand M/M Fiber for Light Pole Camera location</text_data><comment_date>2020-11-19T00:00:00</comment_date></row><row _id="row-eett_ktem-j9hs" _uuid="00000000-0000-0000-3D22-91887FBA05F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eett_ktem-j9hs"><intent_id>1094800</intent_id><project_id>935759</project_id><text_data>? Demo existing cabling from the 7th floor down to the 6th floor IDF.? Remove all cable off site that will be wrecked out.</text_data><comment_date>2020-10-09T00:00:00</comment_date></row><row _id="row-f59p_zztg-i7dd" _uuid="00000000-0000-0000-C17D-7F3A4DDF4666" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f59p_zztg-i7dd"><intent_id>514640</intent_id><project_id>688704</project_id><text_data>1)  215 n 168th, shoreline 98133</text_data><comment_date>2012-06-01T00:00:00</comment_date></row><row _id="row-jhud.2b67_26p8" _uuid="00000000-0000-0000-8492-CA05571E8958" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jhud.2b67_26p8"><intent_id>1077656</intent_id><project_id>927901</project_id><text_data>All work will be performed by subcontractors, except for possible punch-list items and/or site clean-up.BCI Project Number is ES9022.Filed by Kathi Clark</text_data><comment_date>2020-08-04T00:00:00</comment_date></row><row _id="row-g2in~9gpu.8nmp" _uuid="00000000-0000-0000-E4D1-A328E764D4C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g2in~9gpu.8nmp"><intent_id>502816</intent_id><project_id>683730</project_id><text_data>Form filed by: Ron Bishop - murq235</text_data><comment_date>2012-03-06T00:00:00</comment_date></row><row _id="row-p3sr_e98s-us8d" _uuid="00000000-0000-0000-B7FC-5A9461C82DE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p3sr_e98s-us8d"><intent_id>999694</intent_id><project_id>852478</project_id><text_data>supply and install elastic layer shock pad</text_data><comment_date>2019-08-14T00:00:00</comment_date></row><row _id="row-jwv4~67nx_9gde" _uuid="00000000-0000-0000-4C85-DFF76D6C1BCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jwv4~67nx_9gde"><intent_id>1176525</intent_id><project_id>978764</project_id><text_data>2021 Inside FM Electrician - Wage $55.39; District 9 $4.69; Edison Pension $8.95; NEBF $1.66; Health &amp; Welfare $10.05; Flex $1.30; Apprenticeship $.80; BLMCC $.20 (total fringe $27.65)</text_data><comment_date>2021-09-10T00:00:00</comment_date></row><row _id="row-t6p5_8i3n.82b3" _uuid="00000000-0000-0000-7F0F-BB9EAB1C5659" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t6p5_8i3n.82b3"><intent_id>1038265</intent_id><project_id>908360</project_id><text_data>MOTOR PATROL GRADER IS FOR HOURS OPERATING OUR VACTOR HYDRO-EXCAVATOR (SUPER SUCKER)</text_data><comment_date>2020-02-13T00:00:00</comment_date></row><row _id="row-7mke.z9u8-iqr6" _uuid="00000000-0000-0000-4B86-54BC29C7C7D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7mke.z9u8-iqr6"><intent_id>940233</intent_id><project_id>864226</project_id><text_data>Inside Electrician - Wage $42.60; District 9 $3.67; Edison Pension $7.20; NEBF $1.28; Health &amp; Welfare $9.80; Flex $1.30; Apprenticeship $.80; BLMCC $.20 Inside Apprentice Step 1 (1-1000 hours) - Wage $17.07; NEBF $0.51; Health &amp; Welfare $9.80; Flex $1.30; Apprenticeship $1.20; BLMCC $0.20Inside Apprentice Step 2 (1001-2000 hours) - Wage $19.17; NEBF $0.58; Health &amp; Welfare $9.80; Flex $1.30; Apprenticeship $1.20; BLMCC $0.20Inside Apprentice Step 3 (2001-3500 hours) - Wage $21.30; District 9 $1.84; Edison Pension $3.60; NEBF $0.64; Health &amp; Welfare $9.80; Flex $1.30; Apprenticeship $1.20; BLMCC $0.20Inside Apprentice Step 4 (3501-5000 hours) - Wage $25.56; District 9 $2.20; Edison Pension $4.32; NEBF $0.77; Health &amp; Welfare $9.80; Flex $1.30; Apprenticeship $1.20; BLMCC $.20�Flex� � union required benefit fund</text_data><comment_date>2018-10-17T00:00:00</comment_date></row><row _id="row-567v_wsup~bc7k" _uuid="00000000-0000-0000-85C2-A2CB900F94AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-567v_wsup~bc7k"><intent_id>546883</intent_id><project_id>700729</project_id><text_data>Truck Drivers/Other Trucks include Pickup Trucks and 4,000 Gallon Water Trucks</text_data><comment_date>2012-12-03T00:00:00</comment_date></row><row _id="row-uwzw~xvm3~n3kt" _uuid="00000000-0000-0000-9C27-3CBCBF2CDC6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwzw~xvm3~n3kt"><intent_id>1097104</intent_id><project_id>927468</project_id><text_data>Deliver topsoil and compost to job site with conveyor truck</text_data><comment_date>2020-10-19T00:00:00</comment_date></row><row _id="row-8tkv.twvr.qh5j" _uuid="00000000-0000-0000-F430-CC81B71FAA3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8tkv.twvr.qh5j"><intent_id>1244164</intent_id><project_id>862374</project_id><text_data>I could not find the super solo dump truck in the occupation sectionWe are using DUMP TRUCK &amp; TRAILER AND SOLO DUMP TRUCKS</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-36ar-agdv~z7pb" _uuid="00000000-0000-0000-3F19-92E493448A81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-36ar-agdv~z7pb"><intent_id>694341</intent_id><project_id>762178</project_id><text_data>Part A and Part B = Sports field drainage installation project; Slit-drainage is to drain standing water, ie: rain, irrigation. A trench that is consistently less than 2 feet is cut(skid steer (less than 90 hp) with implement)/dug (handwork using shovels)and drain pipe is installed, then the trench is filled.</text_data><comment_date>2015-05-13T00:00:00</comment_date></row><row _id="row-bhfd-vqmv~hhzt" _uuid="00000000-0000-0000-3BEE-95852A3393DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bhfd-vqmv~hhzt"><intent_id>1168488</intent_id><project_id>954006</project_id><text_data>2381844</text_data><comment_date>2021-08-12T00:00:00</comment_date></row><row _id="row-g432_5xfr_rpfh" _uuid="00000000-0000-0000-4EAD-F9BB2967A099" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g432_5xfr_rpfh"><intent_id>841231</intent_id><project_id>823378</project_id><text_data>GU Job #17138Truck Driver:  Lowboy to transport equipment to job site.</text_data><comment_date>2017-06-16T00:00:00</comment_date></row><row _id="row-b96v.753h-4iad" _uuid="00000000-0000-0000-5B1D-54EFC5B9FA80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b96v.753h-4iad"><intent_id>622181</intent_id><project_id>720212</project_id><text_data>143152Provide and install category 6 cabling for voice and data. All cabling will be installed indoors to the nearest MDF or IDF. Provide and install backbone cabling to support connectivity at the MDF or IDF comm rooms. Terminate, test and label all.</text_data><comment_date>2014-03-27T00:00:00</comment_date></row><row _id="row-byi6-2w83-sp3c" _uuid="00000000-0000-0000-1E16-DB3AACD2BD0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-byi6-2w83-sp3c"><intent_id>1318792</intent_id><project_id>1062841</project_id><text_data>W1344000 - Intent</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-q8xd-myen.is33" _uuid="00000000-0000-0000-43F3-D1A16D6A41CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8xd-myen.is33"><intent_id>718893</intent_id><project_id>760369</project_id><text_data>Install 12 CAT6 cables between MDF/IDF and 6 workstations for phone (voice over distance) and/or data (bits and bytes) connection.  Work to be performed indoors</text_data><comment_date>2015-09-03T00:00:00</comment_date></row><row _id="row-fyxh-hbx4.zxsj" _uuid="00000000-0000-0000-140B-F5A4DA228698" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fyxh-hbx4.zxsj"><intent_id>841946</intent_id><project_id>824947</project_id><text_data>1)HVAC installation 2)yes 3)2 4)a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no 5)yes 6)yes 7)no 8)no</text_data><comment_date>2017-06-20T00:00:00</comment_date></row><row _id="row-5xd9-y2u3_2ads" _uuid="00000000-0000-0000-5277-7E4C577062B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5xd9-y2u3_2ads"><intent_id>489440</intent_id><project_id>632494</project_id><text_data>Laborers will only be performing hand work to seal water leaks in pump station days prior to painters spraying</text_data><comment_date>2011-11-16T00:00:00</comment_date></row><row _id="row-dqc5~aqsd_jr8t" _uuid="00000000-0000-0000-A0F5-03DC56D27636" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dqc5~aqsd_jr8t"><intent_id>706521</intent_id><project_id>766854</project_id><text_data>045136</text_data><comment_date>2015-07-10T00:00:00</comment_date></row><row _id="row-auge.ys62-w2fg" _uuid="00000000-0000-0000-B6F9-D0441BEE872B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-auge.ys62-w2fg"><intent_id>1011646</intent_id><project_id>894857</project_id><text_data>Blythe job W522</text_data><comment_date>2019-10-02T00:00:00</comment_date></row><row _id="row-csdm_hacd~shd6" _uuid="00000000-0000-0000-D5E0-F0BED71AC928" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-csdm_hacd~shd6"><intent_id>1500304</intent_id><project_id>1164724</project_id><text_data>INV # 24480868 SR # 57967862</text_data><comment_date>2025-01-09T00:00:00</comment_date></row><row _id="row-vyg6.qwkt-k6du" _uuid="00000000-0000-0000-486B-ED4C4C49F317" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vyg6.qwkt-k6du"><intent_id>1041286</intent_id><project_id>896318</project_id><text_data>2.Fringe $30.79 = $2.30 PTO, Health Secuirty $9.01, Pension $11.00, Apprenticeship $.74, Annuity $7.95, Impact $.28. Industry Fund $.01.Fringe $21.22 = Health &amp; Security $8.57, Pension $13.15, Apprenticehip Training/Retaining $.70, National Training $.05.</text_data><comment_date>2020-07-28T00:00:00</comment_date></row><row _id="row-kgcs-fnit_v9f9" _uuid="00000000-0000-0000-282D-3465E05CEEC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kgcs-fnit_v9f9"><intent_id>1109101</intent_id><project_id>933738</project_id><text_data>201069- Per WAC-296-127-01322 Electronic Technicians will be installing cabling for cameras and devices. Terminate, test and label.201069- Per WAC-296-127-01378 Telecommunication Technicians will be installing cabling for telephones, computers and wireless access points (wireless data) for internet access. Terminate, test and label.</text_data><comment_date>2020-12-10T00:00:00</comment_date></row><row _id="row-grsq.398m_kpfg" _uuid="00000000-0000-0000-66FD-E4C85E29FFC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-grsq.398m_kpfg"><intent_id>1237590</intent_id><project_id>1015567</project_id><text_data>22-80-144The other truck will be a lowboy tractor and trailer used to haul heavy equipment to and from the project.</text_data><comment_date>2022-05-31T00:00:00</comment_date></row><row _id="row-nvut-jh6j~pf5q" _uuid="00000000-0000-0000-B496-980E98BF6904" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nvut-jh6j~pf5q"><intent_id>701628</intent_id><project_id>761600</project_id><text_data>Our subcontractor will be delivering product on a semi truck and blowing it in with a hose</text_data><comment_date>2015-06-18T00:00:00</comment_date></row><row _id="row-wffk-nn5y_xvp5" _uuid="00000000-0000-0000-08D6-3C53E8CD46B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wffk-nn5y_xvp5"><intent_id>1343065</intent_id><project_id>1036698</project_id><text_data>Employees are verified to have Worker's compensation insurance coverage for all duties they perform under this contract.</text_data><comment_date>2023-07-18T00:00:00</comment_date></row><row _id="row-np6i_ughg.fa3p" _uuid="00000000-0000-0000-7819-EC12DB1E8E5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-np6i_ughg.fa3p"><intent_id>605396</intent_id><project_id>724286</project_id><text_data>Telecom Tech (09)  To install data cabling - inside work</text_data><comment_date>2013-11-20T00:00:00</comment_date></row><row _id="row-vgsw-g93p_h5d5" _uuid="00000000-0000-0000-5FFB-A57B09DCF829" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vgsw-g93p_h5d5"><intent_id>1152395</intent_id><project_id>929679</project_id><text_data>(Hicker, Daniel) Sheet Metal Workers totals $1.14 and the breakdown of that total amount is $0.00 medical, $0.00 dental, $0.00 life, $0.00 pension, $.52 vacation and $.62 holiday.</text_data><comment_date>2021-06-28T00:00:00</comment_date></row><row _id="row-kure-zakr~33ii" _uuid="00000000-0000-0000-F629-21FEABBD4B89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kure-zakr~33ii"><intent_id>630463</intent_id><project_id>704635</project_id><text_data>From: James Werner [mailto:jwerner_2003@yahoo.com] Sent: Monday, June 16, 2014 1:38 PMTo: Herman, Laura E (LNI)Subject: request for a note to be added to my intent form #630463Hi Laura, I was requested by the general contractor on this project to have a note added to my intent. My intent# is 630463 and it is for Chambers Creek with Mortenson as the GC. The note I need added is- &amp;quot; this intent is for BP 115&amp;quot;. The GC informed me that you could process this request. Thanks,James WernerWerner Flooring206-229-3184</text_data><comment_date>2014-06-16T00:00:00</comment_date></row><row _id="row-vtjd_cvkx~czan" _uuid="00000000-0000-0000-9F1A-F0D507384A08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vtjd_cvkx~czan"><intent_id>1026426</intent_id><project_id>884418</project_id><text_data>Job #19221</text_data><comment_date>2019-12-11T00:00:00</comment_date></row><row _id="row-ahjd_ijrq.55jg" _uuid="00000000-0000-0000-C9A6-34646B33EEF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ahjd_ijrq.55jg"><intent_id>610398</intent_id><project_id>699258</project_id><text_data>Filed by Julie A. Bolta.</text_data><comment_date>2014-01-02T00:00:00</comment_date></row><row _id="row-2sqi.egmy-jtpn" _uuid="00000000-0000-0000-7F75-50F743D49AFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2sqi.egmy-jtpn"><intent_id>472729</intent_id><project_id>666687</project_id><text_data>Update to &amp;quot;Our part of the project&amp;quot; - One employee drove truck to pick up rental hydroseeding machine from rental location to school and back.</text_data><comment_date>2011-09-09T00:00:00</comment_date></row><row _id="row-k7pt_ckud_thpt" _uuid="00000000-0000-0000-B251-5E28FFB2A66F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7pt_ckud_thpt"><intent_id>983893</intent_id><project_id>883888</project_id><text_data>Telecom Tech: Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2019-06-11T00:00:00</comment_date></row><row _id="row-6rs3~dzr3_cq3s" _uuid="00000000-0000-0000-E481-21EBE4A6147F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6rs3~dzr3_cq3s"><intent_id>621295</intent_id><project_id>731421</project_id><text_data>Form filed by: David Templeton</text_data><comment_date>2014-03-21T00:00:00</comment_date></row><row _id="row-mrn7~ndcy-xnip" _uuid="00000000-0000-0000-ADED-14B306337E81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrn7~ndcy-xnip"><intent_id>951001</intent_id><project_id>868797</project_id><text_data>C/O LaceyS Side of MeridianRemoval of 13 dead treesEstimate #19505</text_data><comment_date>2018-12-15T00:00:00</comment_date></row><row _id="row-npec_9pnt-wmwc" _uuid="00000000-0000-0000-4B13-21DC6847CB63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-npec_9pnt-wmwc"><intent_id>1105883</intent_id><project_id>936359</project_id><text_data>We hired Speer Taps as the sub tier contractor. Their UBI # is 600491975.</text_data><comment_date>2020-11-24T00:00:00</comment_date></row><row _id="row-n3vq.id74.uuh2" _uuid="00000000-0000-0000-03B9-6C0C6DB1B9E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n3vq.id74.uuh2"><intent_id>719697</intent_id><project_id>771970</project_id><text_data>N/A</text_data><comment_date>2015-09-09T00:00:00</comment_date></row><row _id="row-tvej-tkp4_2mcy" _uuid="00000000-0000-0000-E7E1-85E8F6F245C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tvej-tkp4_2mcy"><intent_id>1109618</intent_id><project_id>941288</project_id><text_data>Drywall patches for city hall.</text_data><comment_date>2020-12-14T00:00:00</comment_date></row><row _id="row-nthw.btwq_9gmt" _uuid="00000000-0000-0000-DB79-99A5DAD00053" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nthw.btwq_9gmt"><intent_id>1121682</intent_id><project_id>950190</project_id><text_data>The technicians installed 1 - Cat 6 Data Cable and Exterior (Outdoor) AP for Wi-Fi connection at 44 King County Library System sites: 1.    Algona-Pacific Library 2.    Auburn Library 3.    Bellevue Library 4.    Black Diamond Library  5.    Boulevard Park Library 6.    Carnation Library *   7.    Covington Library 8.    Des Moines Library 9.    Enumclaw Library 10. Fairwood Library 11. Fall City Library *   12. Federal Way Library 13. Federal Way 320th Library 14. Issaquah Library 15. Kent Library 16. Kent Panther Lake Library 17. Kingsgate Library 18. Kirkland Library 19. Lake Hills Library 20. Maple Valley Library 21. Mercer Island Library 22. Muckleshoot Library      23. Newcastle Library 24. Newport Way Library 25. North Bend Library      26. Redmond Library 27. Renton Library 28. Renton Highlands Library 29. Sammamish Library 30. Skyway Library 31. White Center Library 32. Woodmont Library33. Snoqualmie34. Duvall35. Woodinville36. Bothell37. Kenmore38. Shorline39. Richmond Beach40. Burien41. Valleyview42. Vashon43. Tukwila44. Greenbridge</text_data><comment_date>2021-02-22T00:00:00</comment_date></row><row _id="row-kptb_4kc5.x26f" _uuid="00000000-0000-0000-4AFD-308E51B80A47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kptb_4kc5.x26f"><intent_id>793504</intent_id><project_id>790091</project_id><text_data>Installation of irrigation.</text_data><comment_date>2016-10-03T00:00:00</comment_date></row><row _id="row-mqk5~3hyj~66gi" _uuid="00000000-0000-0000-A89D-8F2E40003265" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mqk5~3hyj~66gi"><intent_id>834985</intent_id><project_id>820048</project_id><text_data>This project requires davis bacon wages and the wages/crafts on the L and I website to not correspond to the wages in the wage determination received with the contract documents.  The wage used above for the Bob Cat Skid Steer came directly from that wage determination.  Also, there is no category for landscape laborer any where except under the trade of landscape construction.  The occupation of landscaping laborer is being used because of that but the wage is in fact the wage under laborers group 1 - Landscape Laborer in the provided wage determination.</text_data><comment_date>2017-05-18T00:00:00</comment_date></row><row _id="row-6x88.yqw3.rziu" _uuid="00000000-0000-0000-58FF-6C375951BE06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6x88.yqw3.rziu"><intent_id>809298</intent_id><project_id>788714</project_id><text_data>filed by Leanne Lettice</text_data><comment_date>2016-12-30T00:00:00</comment_date></row><row _id="row-z44p_xn8h_aeqj" _uuid="00000000-0000-0000-EA28-2C98E873DE00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z44p_xn8h_aeqj"><intent_id>1185008</intent_id><project_id>933914</project_id><text_data>Pars Quality Flooring will be preforming the install</text_data><comment_date>2021-10-12T00:00:00</comment_date></row><row _id="row-mr5g-443x.8uvm" _uuid="00000000-0000-0000-4063-57AB43AF1FD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mr5g-443x.8uvm"><intent_id>745600</intent_id><project_id>784584</project_id><text_data>1. install wheelchair ramp 2. single family 3. Two 4.a-no b-no c.-yes d-no e-no f-no g-no h-no i-no j-no k-no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2016-02-08T00:00:00</comment_date></row><row _id="row-tcq4_2wi2_da3m" _uuid="00000000-0000-0000-043A-E3AAA669928B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tcq4_2wi2_da3m"><intent_id>1282985</intent_id><project_id>1040547</project_id><text_data>#1 - Urgent request to investigate and repair dishwasher drain that is dumping onto floor and into crawlspace. #2 - single family dwelling. #3 - one. #4 (a) no (b) no (c) yes (d) no (e) no (f) no (g) no (h) no (I) no (j) no (k) no (l) no #5 - yes #6 - yes #7 - no #8 � no</text_data><comment_date>2022-11-11T00:00:00</comment_date></row><row _id="row-x7gw_atmw.b6h2" _uuid="00000000-0000-0000-5607-F6DF8EB3C610" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x7gw_atmw.b6h2"><intent_id>588387</intent_id><project_id>716493</project_id><text_data>3826</text_data><comment_date>2013-08-19T00:00:00</comment_date></row><row _id="row-ehsa-3gwx_v44m" _uuid="00000000-0000-0000-5740-275C77D04D56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ehsa-3gwx_v44m"><intent_id>1240272</intent_id><project_id>1011816</project_id><text_data>*ECB Corp dba Omniduct**ECB Corp is a fabrication shop only and does not require a contractor�s license***All work is performed off-site in shop at 1515 75th St SW, Everett, WA</text_data><comment_date>2022-06-10T00:00:00</comment_date></row><row _id="row-wwgb-k7ec-mdxf" _uuid="00000000-0000-0000-7895-3F06F2E54DA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wwgb-k7ec-mdxf"><intent_id>838120</intent_id><project_id>809339</project_id><text_data>The general contractor is building a new building.  We are the landscape subcontractor.  We will be installing irrigation to the depth of 12-15�; installing topsoil (8� depth), plants and mulch (2� depth).  All work to be performed using picks, shovels, rakes, and wheelbarrows.  There will not be any French drains installed in our subsurface water collection systems.</text_data><comment_date>2017-06-08T00:00:00</comment_date></row><row _id="row-85z8~z92t~xy8q" _uuid="00000000-0000-0000-D62B-0E30B4E5DBFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-85z8~z92t~xy8q"><intent_id>643255</intent_id><project_id>738102</project_id><text_data>Truck driver is driving a 3000 gal truck mounted hydroseeder</text_data><comment_date>2014-07-24T00:00:00</comment_date></row><row _id="row-h2qf_iivu-xvq8" _uuid="00000000-0000-0000-B05F-5FD4230F5F5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2qf_iivu-xvq8"><intent_id>1284534</intent_id><project_id>1018180</project_id><text_data>Material supplier only</text_data><comment_date>2022-11-29T00:00:00</comment_date></row><row _id="row-5m38~cnnp-m7bd" _uuid="00000000-0000-0000-C1B8-298FD9230163" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5m38~cnnp-m7bd"><intent_id>835971</intent_id><project_id>822519</project_id><text_data>To perform on call service at City of Issaquah facilities.  Contract in effect 5/1/17-12/21/18.</text_data><comment_date>2017-05-24T00:00:00</comment_date></row><row _id="row-pzu9.p47v_eura" _uuid="00000000-0000-0000-E8EA-9D4FCBC255CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pzu9.p47v_eura"><intent_id>1147818</intent_id><project_id>964021</project_id><text_data>Project# 03110, Wyant Jr, Thomas, 4215 N Burns Rd, Spokane Valley, WA 99216</text_data><comment_date>2021-06-02T00:00:00</comment_date></row><row _id="row-9dwz-ezfe_pubq" _uuid="00000000-0000-0000-1647-5E0B8552774B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9dwz-ezfe_pubq"><intent_id>1419052</intent_id><project_id>1120096</project_id><text_data>9940524</text_data><comment_date>2024-04-14T00:00:00</comment_date></row><row _id="row-xmh5~pirh.sw9s" _uuid="00000000-0000-0000-E2CC-6D39EAD1FB2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xmh5~pirh.sw9s"><intent_id>1508416</intent_id><project_id>1169717</project_id><text_data>40062778</text_data><comment_date>2025-02-10T00:00:00</comment_date></row><row _id="row-r78r~i56n_zmfa" _uuid="00000000-0000-0000-BF0E-638CB794ECFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r78r~i56n_zmfa"><intent_id>1508656</intent_id><project_id>1169885</project_id><text_data>INV # 52649699 SR # 58567774</text_data><comment_date>2025-02-10T00:00:00</comment_date></row><row _id="row-tw4m-4rnj~5d7n" _uuid="00000000-0000-0000-8AA6-BD830FD7CC9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tw4m-4rnj~5d7n"><intent_id>899136</intent_id><project_id>843752</project_id><text_data>Our general laborers unload and distribute cabinets from our delivery truck to various rooms on the jobsite.  The only tools used are hand trucks and rolling carts.Our trucks are 14� and 26� box trucks for delivery of cabinets.</text_data><comment_date>2018-04-17T00:00:00</comment_date></row><row _id="row-urkz~ard3_ng5d" _uuid="00000000-0000-0000-A7D8-7FFDAD53180F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-urkz~ard3_ng5d"><intent_id>1229337</intent_id><project_id>1010688</project_id><text_data>Option A: Seal Abandoned Heating Duct to Prevent Smells and Moisture from Entering Building.Remove heat registers to access ducting.Protect flooring around work area as needed. (Customer to remove carpet from carpeted areas as needed) Hand grind perimeter as needed for proper adhesion.With ridged foam build base structure to support epoxy while in liquid form.Seal perimeter so epoxy cannot leak into duct void.Mix and apply DuraQuartz epoxy 2�-2.5� forming a ridged moisture resistant �cap�.Reinstall heat register. (Customer to reinstall or replace carpet if desired)Repeat steps on all heating registers and supply duct in mech room.   Cleanup as requiredVehicles - truck/van Tools - battery powered drill w/mixing bit, hand tools, battery powered angle grinder</text_data><comment_date>2022-05-18T00:00:00</comment_date></row><row _id="row-jpug.k3jg_wsix" _uuid="00000000-0000-0000-9D93-BF0D1A82E8AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jpug.k3jg_wsix"><intent_id>980385</intent_id><project_id>803227</project_id><text_data>A) Construction of the Northgate link light railing station.B) We will be setting &amp;  attaching panels, setting man doors and automating vehicle gates.C) General Laborer will be setting &amp; attaching panels, setting man doors and vehicle gates.D) General Laborer will be using roto hammers and assorted hand tools.</text_data><comment_date>2019-06-03T00:00:00</comment_date></row><row _id="row-kdnp-ns2a.238u" _uuid="00000000-0000-0000-9DC2-0DDFD58061F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kdnp-ns2a.238u"><intent_id>467789</intent_id><project_id>668154</project_id><text_data>UWMC 8NE TI 958842032</text_data><comment_date>2011-07-25T00:00:00</comment_date></row><row _id="row-nwkt~ttxw.r9si" _uuid="00000000-0000-0000-5500-6D09BC6E2110" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nwkt~ttxw.r9si"><intent_id>789351</intent_id><project_id>802484</project_id><text_data>096093</text_data><comment_date>2016-09-14T00:00:00</comment_date></row><row _id="row-xt47_pnqs~yhyq" _uuid="00000000-0000-0000-BBC6-17BCB29F6830" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xt47_pnqs~yhyq"><intent_id>882835</intent_id><project_id>840936</project_id><text_data>This project is outside this company&amp;#39;s normal work and prevailing wage certification is all new to me, though the job is very small (a 10-1/2&amp;#39; concrete circle about 2&amp;#39; wide) and well within their field of expertise. The owner will perform all the skilled tasks and complete the job with the help of one or two residential carpenter employees in supporting roles best described as laborers.</text_data><comment_date>2018-01-17T00:00:00</comment_date></row><row _id="row-g54w~kszi~54jj" _uuid="00000000-0000-0000-95DD-8E2DBBF4FE44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g54w~kszi~54jj"><intent_id>858852</intent_id><project_id>831101</project_id><text_data>This Intent is for 1/1/17 - 2/28/17 - we got a new UBI # - our old UBI #603045046 will cover 4/1/16 - 12/31/16</text_data><comment_date>2017-08-28T00:00:00</comment_date></row><row _id="row-isj3~rv5d_7u3n" _uuid="00000000-0000-0000-32CD-9CE359FBCADD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-isj3~rv5d_7u3n"><intent_id>926221</intent_id><project_id>856952</project_id><text_data>MMFS Job#73186599</text_data><comment_date>2018-08-16T00:00:00</comment_date></row><row _id="row-sjr8~4fhy_mc8n" _uuid="00000000-0000-0000-9587-E35FD8C38518" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sjr8~4fhy_mc8n"><intent_id>661467</intent_id><project_id>738351</project_id><text_data>PEO DRIVES AND OPERATES VACUUM TRUCKLABORER HANDLES HOSESFRINGE FOR BOTH PEO AND LABORERS  2.01 PER HOUR MEDICAL DENTAL VISION LIFE.   .74 PER HOUR VACATION AND HOLIDAY</text_data><comment_date>2014-10-21T00:00:00</comment_date></row><row _id="row-pp9t.thdv_gxqx" _uuid="00000000-0000-0000-8F19-AB7B1A6EA710" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pp9t.thdv_gxqx"><intent_id>1277742</intent_id><project_id>931764</project_id><text_data>JMI JOB #S45979 - PSR FIELD WELD</text_data><comment_date>2022-10-25T00:00:00</comment_date></row><row _id="row-anrt.uzcv-29vx" _uuid="00000000-0000-0000-36FF-D8F5FD48A36F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-anrt.uzcv-29vx"><intent_id>643147</intent_id><project_id>740056</project_id><text_data>Job Order Contract  C00651C11</text_data><comment_date>2014-07-23T00:00:00</comment_date></row><row _id="row-tsum.j4rt~yn64" _uuid="00000000-0000-0000-1876-45A86F6EDC05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsum.j4rt~yn64"><intent_id>1081699</intent_id><project_id>929709</project_id><text_data>Dispatched to water cleanup on 9/17/19 that occurred in the cafeteria. Arrived onsite and assessed the situation. Set up 2 dehumidifiers, 10 air movers and 1 negative air. Sprayed antimicrobial and monitored moisture levels. Once dry, repairs were performed- replacing damaged materials. Tools used: hammer, screw driver, pry bar, containment, tension post, plastic, tape, drywall panel lift,  debris bags and moisture meter.</text_data><comment_date>2020-08-19T00:00:00</comment_date></row><row _id="row-prw8~iwkb~kd2e" _uuid="00000000-0000-0000-7F48-12E5C07F66ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prw8~iwkb~kd2e"><intent_id>1015088</intent_id><project_id>896079</project_id><text_data>Other truck: Low boy for Mobilization</text_data><comment_date>2019-10-14T00:00:00</comment_date></row><row _id="row-4ktj.5eft~njyv" _uuid="00000000-0000-0000-C877-D323E58EB4A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ktj.5eft~njyv"><intent_id>944974</intent_id><project_id>866126</project_id><text_data>Cleanup after light bulb broke over AV equipment</text_data><comment_date>2018-11-11T00:00:00</comment_date></row><row _id="row-k952~8swd.jjuk" _uuid="00000000-0000-0000-0A25-6AAC10F40DAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k952~8swd.jjuk"><intent_id>1207336</intent_id><project_id>997039</project_id><text_data>1. Purpose is to improve radio signal from Pierce County's existing 700MHz public safety radio system in the new jail, the existing jail and an Administrative building on the same campus. This will be done by installing a Distributed Antenna System (DAS) throughout these buildings. 2. All equipment provided and installed is standard, Commercial Off the Shelf (COTS) equipment for said purpose.3. This project does require some minor building modification work to allow the equipment to be installed. However in this case, all of that scope is owned by the County. It is not part of this vendor's contract scope.4. Motorola Solutions will be outsourcing the installation of telecommunications equipment as part of this contract. Motorola employees will not be performing installation work. Our subcontractors have been notified of the need for them to also file Intents and Affidavits for Washington L&amp;I PW projects.5. Motorola Solutions employees assigned to this project are as follows:Telecommunications Engineers: System engineering tasks largely performed on company computers from their offices.Project Manager: Responsible for managing Motorola Solutions contract scope of work. Scheduling resources, reporting on project progress and ensuring adherence to the customer contract.Systems Technologists: Responsible for equipment programming, optimization and testing. 6. Motorola employees use laptop computers to perform their work, along with typical radio system test equipment. No Motorola employees will use hand tools or other installation tools to install equipment.7. See #6. Laptops are the primary tool to perform their tasks. 8. Yes. Motorola will be utilizing subcontractors to perform work. Both subcontractors have been notified of the need for their companies to file Intents and Affidavits associated with the work they will perform under this contract.9. Motorola Solutions' work will be completed during the public works project.</text_data><comment_date>2022-03-15T00:00:00</comment_date></row><row _id="row-d9u5-3v9q-y4rf" _uuid="00000000-0000-0000-928B-3F1FE2A04CEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d9u5-3v9q-y4rf"><intent_id>624916</intent_id><project_id>732291</project_id><text_data>Per Gilbert 4/15/14, this project is hourly, but he estimates the contract amount to be $3000.</text_data><comment_date>2014-04-15T00:00:00</comment_date></row><row _id="row-akyf_ztrm_5r7w" _uuid="00000000-0000-0000-5D5F-FE357461F282" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-akyf_ztrm_5r7w"><intent_id>502999</intent_id><project_id>683246</project_id><text_data>Health 6.52 Pension 8.95 Appr. .63 Annuity 4.00 Impact .28 Industy .01</text_data><comment_date>2012-03-07T00:00:00</comment_date></row><row _id="row-7xya_5rkn.9vc4" _uuid="00000000-0000-0000-5D42-2418A286F2EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7xya_5rkn.9vc4"><intent_id>698333</intent_id><project_id>763901</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2015-06-03T00:00:00</comment_date></row><row _id="row-r4r3-mfvb~tz2y" _uuid="00000000-0000-0000-6DAB-9886058F5602" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r4r3-mfvb~tz2y"><intent_id>1061027</intent_id><project_id>906293</project_id><text_data>'TRUCK DRIVER - OTHER' USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK'POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)' USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2020-05-28T00:00:00</comment_date></row><row _id="row-rwak.8hmy~hyyk" _uuid="00000000-0000-0000-D0D1-562902E59F5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rwak.8hmy~hyyk"><intent_id>1066737</intent_id><project_id>922356</project_id><text_data>Blythe job X-313</text_data><comment_date>2020-06-21T00:00:00</comment_date></row><row _id="row-a496_sqeh~fpee" _uuid="00000000-0000-0000-E2D4-4F38389BC1AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a496_sqeh~fpee"><intent_id>1126307</intent_id><project_id>937453</project_id><text_data>This project is the construction of a new replacement school building in Federal Way. Our work includes the preparation of soil for plantings and seed or sod. We will install an underground sprinkling system. We will trench by hand using shovels and a mini excavator under 90 hp to 12' to 18'. We will install PVC pipe, sprinkler heads backfilling the trench with 3' sand using a backhoe under 90 hp. For landscaping, we will place 8' of planting topsoil down, plant trees, shrubs and ground cover using both a mini excavator and backhoe, both under 90 hp.</text_data><comment_date>2021-03-03T00:00:00</comment_date></row><row _id="row-nyua_t85x.t3vs" _uuid="00000000-0000-0000-928D-C3BD6D9E16A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nyua_t85x.t3vs"><intent_id>730502</intent_id><project_id>776302</project_id><text_data>WORK PERFORMED BY THE TELECOMMUNICATIONS TECHNICIANS IS INSTALLING TELECOMMUNICATIONS CABLE CATEGORY 6 FOR VOICE (TELEPHONE) AND DATA (COMPUTER NETWORKING) INDOORS.</text_data><comment_date>2015-11-06T00:00:00</comment_date></row><row _id="row-48w8.fmvd~r2d4" _uuid="00000000-0000-0000-C980-F1E08AEE1819" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48w8.fmvd~r2d4"><intent_id>1024653</intent_id><project_id>900917</project_id><text_data>N. Reed St #25, Sedro-Woolley, WA 98284Minkler Rd #1, Sedro-Woolley, WA 98284N Reed St#87, Sedro-Woolley, WA 98284E Division St. #91 Mount Vernon, WA 98274Wicker Rd #45, Sedro-Woolley, WA 982841. Air seal, attic blow, duct seal, crawl, mechanical ventilation2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. No</text_data><comment_date>2019-12-03T00:00:00</comment_date></row><row _id="row-dfub-niur_ey7c" _uuid="00000000-0000-0000-2BAF-FA4CAA7575CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfub-niur_ey7c"><intent_id>1118907</intent_id><project_id>948619</project_id><text_data>1. Furnace Diagnosis/Repair. 2. Single family dwelling. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2021-01-29T00:00:00</comment_date></row><row _id="row-ya7n.px6s~k8vu" _uuid="00000000-0000-0000-F80E-11AD4D41FC09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ya7n.px6s~k8vu"><intent_id>1165130</intent_id><project_id>973119</project_id><text_data>Add cat6 data drops inside high school and gym, inside elementary school and admin/cafeteria. All drops are cat6 cable.  Data cable is for use in putting overhead projectors on the network.</text_data><comment_date>2021-08-09T00:00:00</comment_date></row><row _id="row-ny94_udrr_xqvr" _uuid="00000000-0000-0000-0C94-C6CAE4AD53D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ny94_udrr_xqvr"><intent_id>676765</intent_id><project_id>751940</project_id><text_data>Fringe will be paid on the check in cash</text_data><comment_date>2015-01-28T00:00:00</comment_date></row><row _id="row-kz9w_8xj4_y5d9" _uuid="00000000-0000-0000-EB01-3C37380AE3A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kz9w_8xj4_y5d9"><intent_id>884553</intent_id><project_id>842005</project_id><text_data>1. Change out panels and remove/replace sheetrock as needed for panel installation, 2.  Yes, Apartment 3. Three 4. a) no b) no c) yes d) no e) no f) no g) no h) no i) no j) no k) no l) none   5. yes 6.  yes . no 8. no</text_data><comment_date>2018-01-22T00:00:00</comment_date></row><row _id="row-agjj_z3ec_84qm" _uuid="00000000-0000-0000-F720-CC15C4E43A38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-agjj_z3ec_84qm"><intent_id>612793</intent_id><project_id>727658</project_id><text_data>Landscape Maintenance, Mowing, Edging, Blowing, Pruning, Weeding, Trimming</text_data><comment_date>2014-01-20T00:00:00</comment_date></row><row _id="row-f25j~eqq4-nend" _uuid="00000000-0000-0000-A704-95651C5C7282" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f25j~eqq4-nend"><intent_id>495608</intent_id><project_id>679205</project_id><text_data>Form filed by: Glenn C Robb</text_data><comment_date>2012-01-12T00:00:00</comment_date></row><row _id="row-6i8a.jyt4~bhts" _uuid="00000000-0000-0000-406A-F56A8C5AD3C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6i8a.jyt4~bhts"><intent_id>1068702</intent_id><project_id>923882</project_id><text_data>Fringes: Vacation $4.00, Assessment $1.30, Insurance $9.01, Pension $14.55, Training $2.08, Industry Improvement $.50</text_data><comment_date>2020-06-29T00:00:00</comment_date></row><row _id="row-srte~c8q5.x5vu" _uuid="00000000-0000-0000-B755-83E3243BDA7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-srte~c8q5.x5vu"><intent_id>1122319</intent_id><project_id>950565</project_id><text_data>SRO 1911329</text_data><comment_date>2021-02-15T00:00:00</comment_date></row><row _id="row-aj65.typf.qe62" _uuid="00000000-0000-0000-8F3C-28D07C979137" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aj65.typf.qe62"><intent_id>565355</intent_id><project_id>709171</project_id><text_data>Sprinkler system for existing landscape, depth of less than 3 feet</text_data><comment_date>2013-04-18T00:00:00</comment_date></row><row _id="row-uny7~d4pf_d84j" _uuid="00000000-0000-0000-B225-707A9C8666D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uny7~d4pf_d84j"><intent_id>510655</intent_id><project_id>687152</project_id><text_data>Orchard Ridge is a residential apartment complex that has 104 Units and is three stories in height. Each unit has a kitchen and at least one bathroom and is considered a permanent primary residence. The plumber will be replacing shower heads and aerators and the laborers will be replacing light bulbs. This job meets the residential job requirements.</text_data><comment_date>2012-05-04T00:00:00</comment_date></row><row _id="row-gege_3655~ss7p" _uuid="00000000-0000-0000-B36D-87C3D3721C8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gege_3655~ss7p"><intent_id>971524</intent_id><project_id>876696</project_id><text_data>1 drain cleaning 2 yes 3 na 4a no b no c yes d no e no f no g no h no i no j no k no 5 yes 6 yes 7 no 8 no</text_data><comment_date>2019-04-15T00:00:00</comment_date></row><row _id="row-tc4v.vb7e-6s5w" _uuid="00000000-0000-0000-5F86-3A7692D0822D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tc4v.vb7e-6s5w"><intent_id>491581</intent_id><project_id>662861</project_id><text_data>Monroe-Dry CL</text_data><comment_date>2011-12-01T00:00:00</comment_date></row><row _id="row-x3sz-kt8n-hgvc" _uuid="00000000-0000-0000-A0CB-8522A67C7983" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3sz-kt8n-hgvc"><intent_id>678483</intent_id><project_id>729273</project_id><text_data>Total scope provide by prime. The work performed under the contract includes: Construct Curbs, Gutters, Sidewalks, Bike Lanes, Storm Drainage Improvements, Paving, Landscaping, Irrigation, Street Lights, and Two New Traffic Signals.</text_data><comment_date>2015-02-18T00:00:00</comment_date></row><row _id="row-qsq2~prps_tbwx" _uuid="00000000-0000-0000-AF75-1BE9A7A2F58B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qsq2~prps_tbwx"><intent_id>894228</intent_id><project_id>845983</project_id><text_data>Owner/Operator painted structures at the manufacturer&amp;#39;s yard in Auburn, WA</text_data><comment_date>2018-04-02T00:00:00</comment_date></row><row _id="row-46tk-2is8.xsua" _uuid="00000000-0000-0000-2D59-3C39631C3C38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-46tk-2is8.xsua"><intent_id>528043</intent_id><project_id>677461</project_id><text_data>Form filed by: Vanh Seodara - petu235Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2012-08-13T00:00:00</comment_date></row><row _id="row-q6zq.txan_gxnd" _uuid="00000000-0000-0000-9DB6-7541C761AAB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q6zq.txan_gxnd"><intent_id>582873</intent_id><project_id>716063</project_id><text_data>Weeding - mowing - removal of debris with associated various sites through out LaCenter</text_data><comment_date>2013-07-23T00:00:00</comment_date></row><row _id="row-k469_u2vb~hsbn" _uuid="00000000-0000-0000-65C3-82C95DF28856" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k469_u2vb~hsbn"><intent_id>724375</intent_id><project_id>773897</project_id><text_data>Extended contract</text_data><comment_date>2015-10-02T00:00:00</comment_date></row><row _id="row-2mps~4ett~swiw" _uuid="00000000-0000-0000-E09E-066FAACD007A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2mps~4ett~swiw"><intent_id>531899</intent_id><project_id>695047</project_id><text_data>GENERAL LABORERS WILL WORK AT INSTALLING SIGNS, EROSION CONTROL, GRADE PREP &amp; GENERAL CLEANUP WITH RAKES &amp; SHOVELS.  WATER TRUCK WILL BE USED FOR DUST CONTROL.  GRADER WILL BE USED TO GRADE GRAVEL AND CRUSHED ROCK.</text_data><comment_date>2012-08-30T00:00:00</comment_date></row><row _id="row-rv4g.9svi~jkg8" _uuid="00000000-0000-0000-DC19-68E639E79118" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rv4g.9svi~jkg8"><intent_id>638180</intent_id><project_id>738268</project_id><text_data>Form filed by: HC Todhunter</text_data><comment_date>2014-06-30T00:00:00</comment_date></row><row _id="row-nqhp~kmrs_nrem" _uuid="00000000-0000-0000-DB3A-C86EBF52F755" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nqhp~kmrs_nrem"><intent_id>457627</intent_id><project_id>666830</project_id><text_data>Truck Driver Other:  Tractor w/ 3-Axle Lowboy (Equipment) Trailer</text_data><comment_date>2011-05-25T00:00:00</comment_date></row><row _id="row-jxy3-k66x~pbdm" _uuid="00000000-0000-0000-AC5D-115B1831F649" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jxy3-k66x~pbdm"><intent_id>992147</intent_id><project_id>884556</project_id><text_data>Razz job number 19WBTRUCKS-lowboy delivers rotomill to job site, sweeper driven to job site</text_data><comment_date>2019-07-16T00:00:00</comment_date></row><row _id="row-rdiz_ps5g-dbf4" _uuid="00000000-0000-0000-F35F-CC0AF2DCF559" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rdiz_ps5g-dbf4"><intent_id>693206</intent_id><project_id>761686</project_id><text_data>subcontractor Seifert Electric : SEIFEEL870M2 #603309743 1-INSTALL DUCTLESS HEATPUMP 2-SINGLE FAMILY 3-3 4-LIVING A-NO B-NO C-YES D-NO E-NO F-NO G-NO H-NO I-NO J-NO 5-YES 6-YES 7-NO 8-NO</text_data><comment_date>2015-05-07T00:00:00</comment_date></row><row _id="row-cwwu~9d7z-kxyd" _uuid="00000000-0000-0000-FF43-7BC3480BB136" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cwwu~9d7z-kxyd"><intent_id>1137301</intent_id><project_id>958974</project_id><text_data>MMFS Job#76216033</text_data><comment_date>2021-04-20T00:00:00</comment_date></row><row _id="row-cxnc~h3ez.8add" _uuid="00000000-0000-0000-4E8F-E1EDD67BBB26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxnc~h3ez.8add"><intent_id>588197</intent_id><project_id>708821</project_id><text_data>Bringing product to and from job site - general clean-up/pick-up after job is completed by owner.  Owner did all of own application of plastic striping on job himself.</text_data><comment_date>2013-08-16T00:00:00</comment_date></row><row _id="row-7ebq~gknz~bra9" _uuid="00000000-0000-0000-0CBD-2DE9829E226E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ebq~gknz~bra9"><intent_id>657000</intent_id><project_id>745022</project_id><text_data>1114133</text_data><comment_date>2014-09-25T00:00:00</comment_date></row><row _id="row-rep5-rrh4~rvag" _uuid="00000000-0000-0000-204A-D9C9784766E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rep5-rrh4~rvag"><intent_id>1055132</intent_id><project_id>890679</project_id><text_data>Holroyd Company, Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes and regulations in Washington; andHolroyd Company, Inc. does not agree that the prevailing wage rates set forth by the Department of Labor &amp; Industries for concrete mixer and dump trucks are correct.</text_data><comment_date>2020-04-30T00:00:00</comment_date></row><row _id="row-3dx8~fwud.3vmt" _uuid="00000000-0000-0000-114B-085A126E66A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3dx8~fwud.3vmt"><intent_id>727104</intent_id><project_id>774903</project_id><text_data>Job # 8007158</text_data><comment_date>2015-10-19T00:00:00</comment_date></row><row _id="row-xui7.cefy.j347" _uuid="00000000-0000-0000-BC6C-FE1A701C84F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xui7.cefy.j347"><intent_id>744699</intent_id><project_id>784167</project_id><text_data>Power Equipment Operator is to operate a Auger/line truck which requires a C.D.L to dig holes and boom up large signs.the Laborer uses hand tools hydraulic tampers, shovels etc. for setting sign posts. this project is removing and setting damaged highway guide signs, posts etc. along state highways and county roads.</text_data><comment_date>2016-02-15T00:00:00</comment_date></row><row _id="row-djdr.dxbm~gd55" _uuid="00000000-0000-0000-10B9-413B3C7A13B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-djdr.dxbm~gd55"><intent_id>573770</intent_id><project_id>711594</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR DRIVER - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH OIL/TACK PRIOR TO PLACING ASPHALT</text_data><comment_date>2013-06-06T00:00:00</comment_date></row><row _id="row-z3j3~eyi5.dbk8" _uuid="00000000-0000-0000-F944-1234DCADB9DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3j3~eyi5.dbk8"><intent_id>1265388</intent_id><project_id>1030340</project_id><text_data>Centennial project 74740-0022</text_data><comment_date>2022-09-09T00:00:00</comment_date></row><row _id="row-58ee-ufhh~ggdd" _uuid="00000000-0000-0000-7E91-D4BC5DA192FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-58ee-ufhh~ggdd"><intent_id>922708</intent_id><project_id>849878</project_id><text_data>1118101</text_data><comment_date>2018-08-02T00:00:00</comment_date></row><row _id="row-kfyx-yrre.534e" _uuid="00000000-0000-0000-6E71-2F38662F5CF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kfyx-yrre.534e"><intent_id>633966</intent_id><project_id>736634</project_id><text_data>Form filed by: Tony Freas</text_data><comment_date>2014-06-09T00:00:00</comment_date></row><row _id="row-3wx7~qwis-xmcf" _uuid="00000000-0000-0000-BC0D-E219AC29A869" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3wx7~qwis-xmcf"><intent_id>820143</intent_id><project_id>810552</project_id><text_data>170229</text_data><comment_date>2017-03-10T00:00:00</comment_date></row><row _id="row-4gv4.q4zw-mdqr" _uuid="00000000-0000-0000-35EA-2FC51C229327" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4gv4.q4zw-mdqr"><intent_id>555650</intent_id><project_id>668053</project_id><text_data>Purcell project 13054</text_data><comment_date>2013-02-11T00:00:00</comment_date></row><row _id="row-qejd.8tej~mex7" _uuid="00000000-0000-0000-99A9-38DA5C14EB9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qejd.8tej~mex7"><intent_id>716573</intent_id><project_id>765118</project_id><text_data>Fringe Breakdown:$15.59---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $8.59 Pension$14.88---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $7.88 Pension</text_data><comment_date>2015-08-25T00:00:00</comment_date></row><row _id="row-sj9r.bubm.dakj" _uuid="00000000-0000-0000-61FF-16EBFE8B4D26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sj9r.bubm.dakj"><intent_id>1464920</intent_id><project_id>1014996</project_id><text_data>WESTERN EXTERMINATOR CO/AMBIUS was a hired sub-contractor for FORMA CONSTRUCTION COMPANY as the General Contractor for the Merrill Creek Administration Building Improvements in City of Everett. WESTERN EXTERMINATOR CO/AMBIUS was sub-contracted to provide and install the 100+ assorted INTERIOR tropical plants for the building planters that FORMA built on-site. All staging materials (styrofoam boards and moss) were also included in the scope of work.</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-qrq8.37nw_cje4" _uuid="00000000-0000-0000-AF85-384DA71B3D9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qrq8.37nw_cje4"><intent_id>681389</intent_id><project_id>756644</project_id><text_data>Filed by Michael HummelState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form-Seattle Municipal Tower 26th Floor UPS Addition Prevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.)What is the specific purpose of this awarding agency�s public works project?Program a new UPS unit to the building automation system.2.)Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No. 3.)Does this project entail the remodeling or new construction of a facility?No.4.)If your firm is working upon a type of building system, what type of system is involved? HVAC/Refrigeration control system. 5.)What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.)What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.)If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.)Are you going to be hiring any subcontractors for this project?No.To expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2015-03-02T00:00:00</comment_date></row><row _id="row-ci9p.evfx.f5kh" _uuid="00000000-0000-0000-438C-03F811C279F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ci9p.evfx.f5kh"><intent_id>712494</intent_id><project_id>759797</project_id><text_data>Provide labor to install new bicycle lockers at transit stations.</text_data><comment_date>2015-08-05T00:00:00</comment_date></row><row _id="row-e2yr_qcs7.xqm7" _uuid="00000000-0000-0000-0FC9-AA89F6E07659" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e2yr_qcs7.xqm7"><intent_id>714575</intent_id><project_id>763910</project_id><text_data>2115016</text_data><comment_date>2015-08-14T00:00:00</comment_date></row><row _id="row-jkiy-28y6~xv7f" _uuid="00000000-0000-0000-BD55-C293C652231A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jkiy-28y6~xv7f"><intent_id>568957</intent_id><project_id>710749</project_id><text_data>All address are locate in the city of Tacoma1.  Boyd Chella    1011 East 68th Street2.  Meyer William    2111 North Stevens3.  Josey James    1732 South 43rd Street4.  Johnson Raynaldo    1216 South 19th Street5.  Ferguson Joshua    5203 South Thompson Ave</text_data><comment_date>2013-05-10T00:00:00</comment_date></row><row _id="row-3zpt-pwqv.qetk" _uuid="00000000-0000-0000-B63D-B0B9D99CC3BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3zpt-pwqv.qetk"><intent_id>982371</intent_id><project_id>880175</project_id><text_data>0919520</text_data><comment_date>2019-06-05T00:00:00</comment_date></row><row _id="row-9vn4_b85j_ywm2" _uuid="00000000-0000-0000-233F-D3C9006BB0B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9vn4_b85j_ywm2"><intent_id>984952</intent_id><project_id>845879</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2019-06-14T00:00:00</comment_date></row><row _id="row-rds4_pghv_ikxq" _uuid="00000000-0000-0000-ACCB-AD7C198AB2EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rds4_pghv_ikxq"><intent_id>500867</intent_id><project_id>668288</project_id><text_data>Form filed by: Stephen Nielsen</text_data><comment_date>2012-02-17T00:00:00</comment_date></row><row _id="row-wsbh_idds_k3fb" _uuid="00000000-0000-0000-8A10-3A6BDC2A1B92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wsbh_idds_k3fb"><intent_id>1097588</intent_id><project_id>932364</project_id><text_data>Spoke with Liz at L&amp;I - We are a self insured company and are in good standingsother trucks are low boys to haul equipment</text_data><comment_date>2020-10-21T00:00:00</comment_date></row><row _id="row-zn5n_xykr_3pa6" _uuid="00000000-0000-0000-E6AF-347B25290A14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zn5n_xykr_3pa6"><intent_id>687435</intent_id><project_id>759247</project_id><text_data>This is an annual maintenance agreement to perform weed control and planting in critical areas on port property. tasks may include hand weeding, herbicide spraying, installing plants, removal of dead plant materials, and irrigation by hand watering.</text_data><comment_date>2015-04-04T00:00:00</comment_date></row><row _id="row-gm56-hbjb~ajgw" _uuid="00000000-0000-0000-0462-4CA2CA3735A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gm56-hbjb~ajgw"><intent_id>762343</intent_id><project_id>789877</project_id><text_data>A)Please describe the whole project: Sink clogged causing water damage. B) Please describe your part(s) of the project: Clean area rugs in Woodinville plant. No transportation was performed. C) Please specificially describe the duties being performed and any tools, equipment, or vehicles used: Cleaned area rugs using shampooer/vacuum.</text_data><comment_date>2016-06-16T00:00:00</comment_date></row><row _id="row-wxyi_vcw2_gtpv" _uuid="00000000-0000-0000-9A54-8660322758DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wxyi_vcw2_gtpv"><intent_id>736440</intent_id><project_id>773920</project_id><text_data>#1 waterproofing, #2Residential low income, #3no basement or garage 3 story, #4no to all except (c)yes, #5yes, #6 yes, #7 no, &amp; # 8 no</text_data><comment_date>2015-12-07T00:00:00</comment_date></row><row _id="row-su7w~8ruq-p6w7" _uuid="00000000-0000-0000-F0C4-8D4AFEDBC27C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-su7w~8ruq-p6w7"><intent_id>1080615</intent_id><project_id>889136</project_id><text_data>TRUCK DRIVER - OTHER' USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK</text_data><comment_date>2020-08-16T00:00:00</comment_date></row><row _id="row-nh9m_s3hy~gu8d" _uuid="00000000-0000-0000-4E92-512B406E345A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nh9m_s3hy~gu8d"><intent_id>788447</intent_id><project_id>794236</project_id><text_data>LEI#614616</text_data><comment_date>2016-09-09T00:00:00</comment_date></row><row _id="row-c8qv~b5qx-nn3d" _uuid="00000000-0000-0000-27E8-A17B0F3BB34F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c8qv~b5qx-nn3d"><intent_id>910908</intent_id><project_id>853257</project_id><text_data>Dispose of dish machine after contractors remove all utilities.  Deliver and uncrate new dish machine, set in place and level.  Contractors to install all utilities, we will perform a start up after all power is ready.</text_data><comment_date>2018-06-13T00:00:00</comment_date></row><row _id="row-yb93.w8xu~6vgu" _uuid="00000000-0000-0000-1DB9-04F63F3EF93F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yb93.w8xu~6vgu"><intent_id>1099150</intent_id><project_id>794190</project_id><text_data>We are working as a subcontractor to a landscape company on this landscaping project. We will be installing compost or bark mulch as a topdressing to finish off the landscaped beds and our work falls under the landscape beautification category. Our laborers are responsible for backpack blower cleanup and will be paid according to the rates published for landscaping and planting laborer. The operator of the blower truck will be paid according to the oil distribution / mulch distribution power equipment operator category. Please approve this intent as filed. Thank you for your assistance.</text_data><comment_date>2020-10-27T00:00:00</comment_date></row><row _id="row-7nrp-pwf6-fyqq" _uuid="00000000-0000-0000-C8D7-0AB1C49375E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7nrp-pwf6-fyqq"><intent_id>494567</intent_id><project_id>675740</project_id><text_data>The scope of work for this project is to provide and installCAT6 cabling for voice and data network infrastructure.</text_data><comment_date>2011-12-22T00:00:00</comment_date></row><row _id="row-n9pi_jz7i-tiqr" _uuid="00000000-0000-0000-593B-A6BF8D2471A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n9pi_jz7i-tiqr"><intent_id>965950</intent_id><project_id>875931</project_id><text_data>Provide equipment and phones. Collect database and program. Provide end user training.</text_data><comment_date>2019-03-18T00:00:00</comment_date></row><row _id="row-cnij~6y4u~5cd2" _uuid="00000000-0000-0000-55F1-8EFC3674859D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cnij~6y4u~5cd2"><intent_id>969365</intent_id><project_id>872383</project_id><text_data>General Laborers will clean and seal pavement cracks with crack sealant from the bottom of the asphalt to flush with the surface. Tools and equipment used are a air/heat lance, crack sealant applicator, and light duty pickups.</text_data><comment_date>2019-04-03T00:00:00</comment_date></row><row _id="row-eeru-5b2g-2etb" _uuid="00000000-0000-0000-7732-2C64AB309D3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eeru-5b2g-2etb"><intent_id>1207324</intent_id><project_id>993687</project_id><text_data>OK this is a MOBILE HOME a NO no commercial structure b no retail c permanent residence only d NO rehabilitation house e No transitional housing f NO communal dining g NO treatment service h NO assisted living i NO dormitories j NO counseling k NO rooms rented separately l NO other 5 unit has one kitchen so they can cook meals 6 has bathrooms so they can go to the bathroom in their home 7 no manager other than the home owner 8 ?????  this i9s  a single residence only the owners hopefully this clears this up . It is a Residence only it is a mobile home it is lived in by the owner.</text_data><comment_date>2022-03-01T00:00:00</comment_date></row><row _id="row-4qum~xnjj.vyuk" _uuid="00000000-0000-0000-D430-2BE6240B1B68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4qum~xnjj.vyuk"><intent_id>732706</intent_id><project_id>776571</project_id><text_data>13.66 Fringe Breakdown:Pension: 5.50Healthcare: 7.41Apprenticeship Program: 0.75</text_data><comment_date>2015-11-23T00:00:00</comment_date></row><row _id="row-nfj8_kzbv~ghdr" _uuid="00000000-0000-0000-80B6-40907384F306" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nfj8_kzbv~ghdr"><intent_id>1130214</intent_id><project_id>955071</project_id><text_data>117661-001</text_data><comment_date>2021-03-19T00:00:00</comment_date></row><row _id="row-yzum-9ejq.w3c4" _uuid="00000000-0000-0000-607D-5DED8BE697DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yzum-9ejq.w3c4"><intent_id>752268</intent_id><project_id>781269</project_id><text_data>connect mobile home abs sewer to mobile park sewer- toilet drain leak underneith floor- single- no-no-yes-no-no-no-no-no-no-no-no-no-no-no-</text_data><comment_date>2016-03-18T00:00:00</comment_date></row><row _id="row-qsrm.vwxg.766m" _uuid="00000000-0000-0000-7435-2A4D357D436F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qsrm.vwxg.766m"><intent_id>1288216</intent_id><project_id>912349</project_id><text_data>Public note continued: The wage determination provided that there were 17 workers at a rate of $62.52/hour as sheet metal workers.</text_data><comment_date>2022-12-07T00:00:00</comment_date></row><row _id="row-cxec~kbae-3x2d" _uuid="00000000-0000-0000-1F3E-90201BF5A8A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxec~kbae-3x2d"><intent_id>1469454</intent_id><project_id>1143720</project_id><text_data>OUR SCOPE OF WORK TO INCLUDE PLACEMENT  OF TOPSOIL, PLANTING TREES . BARKING AND SEEDING FOR BEAUTIFICATION OF PROJECT.</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-2xn2.rgnq-r4z5" _uuid="00000000-0000-0000-1ADD-169D07571737" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2xn2.rgnq-r4z5"><intent_id>1469224</intent_id><project_id>1146391</project_id><text_data>9952931</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-qej4~drnw.2nhp" _uuid="00000000-0000-0000-8A48-213FEC25CD9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qej4~drnw.2nhp"><intent_id>751551</intent_id><project_id>787299</project_id><text_data>Job included water extraction , antimicrobial treatment to prevent mold and mildew growth, remove baseboards and reset and caulk, carpet cleaning, and monitoring.  These duties were performed by laborer.  Equipment used included carpet cleaning equipment, hammer, nails, caulking gun, dehumidifiers, air movers and blowers.</text_data><comment_date>2016-03-24T00:00:00</comment_date></row><row _id="row-swt5_bhtg_wphb" _uuid="00000000-0000-0000-9431-326BEE4E32A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-swt5_bhtg_wphb"><intent_id>931179</intent_id><project_id>858165</project_id><text_data>0818085</text_data><comment_date>2018-09-07T00:00:00</comment_date></row><row _id="row-63ud-3psw~2qwv" _uuid="00000000-0000-0000-FA16-C7B39FB9AA72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-63ud-3psw~2qwv"><intent_id>646341</intent_id><project_id>739808</project_id><text_data>Prime Job# 5143227</text_data><comment_date>2014-08-07T00:00:00</comment_date></row><row _id="row-fn8i-wr4r.ap75" _uuid="00000000-0000-0000-BA74-6CA17A9C3A0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fn8i-wr4r.ap75"><intent_id>1237681</intent_id><project_id>1012644</project_id><text_data>This is for Job Services, as already noted. There is no scope of work for this contract. Tasks are as needed, for things such as sweeping, mopping up a leak on a floor, general jobsite cleanup, emptying trash bins.</text_data><comment_date>2022-06-17T00:00:00</comment_date></row><row _id="row-sbpp.euzk-vc9f" _uuid="00000000-0000-0000-F0F3-884735EBEDBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sbpp.euzk-vc9f"><intent_id>1002511</intent_id><project_id>889802</project_id><text_data>Owner and apprentice may or may not work on this job.</text_data><comment_date>2019-08-26T00:00:00</comment_date></row><row _id="row-rfz3-pbzm-hjkg" _uuid="00000000-0000-0000-F7B0-96736FB806C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rfz3-pbzm-hjkg"><intent_id>665474</intent_id><project_id>748726</project_id><text_data>A) Please describe the whole project - The entire project consists of repairing a section of broken pipe extending from the house to the septic tank. B) Please describe your part(s) of the project. - We will dig up/excavate the area of broken pipe, (approximately 10&amp;#39;) remove broken pipe and replace with 3&amp;quot; schedule 40 ABS pipe through foundation wall and connect to existing ABS pipe in basement. C) Please specifically describe the duties being performed by the General Laborer and any tools, equipment, or vehicles used. - General laborer will use a shovel to displace dirt and sod from the work site and replace the dirt and sod upon completion of the plumbing/pipe repair by the journey man plumber.</text_data><comment_date>2014-12-16T00:00:00</comment_date></row><row _id="row-bzke_ffi6-36r3" _uuid="00000000-0000-0000-EA62-0C122440FDC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bzke_ffi6-36r3"><intent_id>744575</intent_id><project_id>757281</project_id><text_data>PCI job number - 15-12330</text_data><comment_date>2016-02-02T00:00:00</comment_date></row><row _id="row-jkfw_6gk6_yhia" _uuid="00000000-0000-0000-F51F-78C637E037BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jkfw_6gk6_yhia"><intent_id>618433</intent_id><project_id>730103</project_id><text_data>Remove concrete and contaminated soilsGeneral Laborers to remove debris using brooms, shovels and/or small hand toolsPower Equipment Operators to excavate area of contaminated soils and concreteMotorPatrol Grader to vacuum area of all contaminated soilsDump trucks to haul conaminated items for disposal</text_data><comment_date>2014-03-03T00:00:00</comment_date></row><row _id="row-nc55.fe24-pxx8" _uuid="00000000-0000-0000-7037-338FC5949219" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nc55.fe24-pxx8"><intent_id>495866</intent_id><project_id>680936</project_id><text_data>Erwin, OHVelasquez, FreelandWalker, CoupevilleKrug, OHEvans, OHCamatti, CoupevilleBackus, ClintonMaserang, OHDodd, OHShipley, OHRobinson, OHWorrel, OHCook, OHEccles, OHCaporgno, OH</text_data><comment_date>2012-01-06T00:00:00</comment_date></row><row _id="row-pfqc~n9hd~75du" _uuid="00000000-0000-0000-8BCB-886F6FC48B34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pfqc~n9hd~75du"><intent_id>965851</intent_id><project_id>871642</project_id><text_data>JCI Project 9N59-0095</text_data><comment_date>2019-03-18T00:00:00</comment_date></row><row _id="row-ta5s.6bux.8nih" _uuid="00000000-0000-0000-FA1D-96223C9D3EBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ta5s.6bux.8nih"><intent_id>1273736</intent_id><project_id>1025415</project_id><text_data>GU Job #22353pwTruck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2022-10-11T00:00:00</comment_date></row><row _id="row-42s9.s58d-sn22" _uuid="00000000-0000-0000-9F6E-01E2593B0F31" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-42s9.s58d-sn22"><intent_id>448820</intent_id><project_id>658035</project_id><text_data>Industrial Insurance Account Id: 170,760-00</text_data><comment_date>2011-04-06T00:00:00</comment_date></row><row _id="row-t3n9_zi83~46gs" _uuid="00000000-0000-0000-1FEE-29C9C2F2FC4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3n9_zi83~46gs"><intent_id>1172905</intent_id><project_id>976947</project_id><text_data>We will be renovating an existing irrigation system, not to exceed 36 inches in depth, using a stand on trencher and various hand tools such as shovels, picks and rakes.</text_data><comment_date>2021-08-27T00:00:00</comment_date></row><row _id="row-j9yg.eyte_w5m3" _uuid="00000000-0000-0000-FC9B-023290EADEFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j9yg.eyte_w5m3"><intent_id>804650</intent_id><project_id>806345</project_id><text_data>Filed by Randy Roosendaal.</text_data><comment_date>2016-11-29T00:00:00</comment_date></row><row _id="row-aadn.snpw-mi7y" _uuid="00000000-0000-0000-A905-5A1F1A6A5C03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aadn.snpw-mi7y"><intent_id>793032</intent_id><project_id>803851</project_id><text_data>Sub Contractor Maddox Concrete UBI 603 593 003 Workmans Comp 628,771-00</text_data><comment_date>2016-09-30T00:00:00</comment_date></row><row _id="row-c46r~r9yi_yj4e" _uuid="00000000-0000-0000-5789-55AF2CC98DD0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c46r~r9yi_yj4e"><intent_id>651252</intent_id><project_id>743100</project_id><text_data>employees Adam Terhune,  Bob Jackson</text_data><comment_date>2014-08-28T00:00:00</comment_date></row><row _id="row-8y66-e3q8~2xun" _uuid="00000000-0000-0000-4CBC-9CB446796510" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8y66-e3q8~2xun"><intent_id>542749</intent_id><project_id>698985</project_id><text_data>DEI Job 10802</text_data><comment_date>2012-11-01T00:00:00</comment_date></row><row _id="row-j233-raj3-b8ef" _uuid="00000000-0000-0000-D99F-B00EA394E998" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j233-raj3-b8ef"><intent_id>930638</intent_id><project_id>860616</project_id><text_data>Truck used was Chevrolet 2500 Silverado PU, long bed. The truck was used to haul equipment and supplies used on this contract.</text_data><comment_date>2018-09-18T00:00:00</comment_date></row><row _id="row-7zss.eipu.ks3i" _uuid="00000000-0000-0000-0CE0-134AC2539F3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zss.eipu.ks3i"><intent_id>989273</intent_id><project_id>886211</project_id><text_data>5050.190143</text_data><comment_date>2019-07-02T00:00:00</comment_date></row><row _id="row-vu65-abf8-54bf" _uuid="00000000-0000-0000-892D-05BB5607FA42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vu65-abf8-54bf"><intent_id>852135</intent_id><project_id>828944</project_id><text_data>23954901.  We are not installing any &amp;quot;landscape fabric, rock, plants, etc.&amp;quot;  We just install the border between the rock and the grass</text_data><comment_date>2017-08-17T00:00:00</comment_date></row><row _id="row-y9h7_vpwf.36kv" _uuid="00000000-0000-0000-4598-8C4F14C48AE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y9h7_vpwf.36kv"><intent_id>1153657</intent_id><project_id>967212</project_id><text_data>#1- heat pump install; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2021-06-18T00:00:00</comment_date></row><row _id="row-m82r_zg3u.zhmf" _uuid="00000000-0000-0000-BBC7-3B04BC483B79" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m82r_zg3u.zhmf"><intent_id>899956</intent_id><project_id>848906</project_id><text_data>Filed by Sasha NielsenProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2018-04-20T00:00:00</comment_date></row><row _id="row-tym2~ha34.rer3" _uuid="00000000-0000-0000-726E-61960C5CC4E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tym2~ha34.rer3"><intent_id>691053</intent_id><project_id>760789</project_id><text_data>Other Truck will be a Oil Distributor</text_data><comment_date>2015-04-27T00:00:00</comment_date></row><row _id="row-ih7k.f45s_infi" _uuid="00000000-0000-0000-2F41-EDB22947B914" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ih7k.f45s_infi"><intent_id>992702</intent_id><project_id>817900</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2019-07-22T00:00:00</comment_date></row><row _id="row-9xrj.4txu-t5p2" _uuid="00000000-0000-0000-1F01-1B20DA4C8485" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9xrj.4txu-t5p2"><intent_id>798592</intent_id><project_id>798155</project_id><text_data>LaborWorks was hired to perform general labor duties-Picking up the garbage-loading dumpsters-laying plastic-sweeping floors.-No power tools or vehicles used.</text_data><comment_date>2016-11-01T00:00:00</comment_date></row><row _id="row-fwuv.3h5m_ivwk" _uuid="00000000-0000-0000-E28B-DA73D4454355" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fwuv.3h5m_ivwk"><intent_id>1045695</intent_id><project_id>889718</project_id><text_data>Semi Truck utilizing a jeep-steer car-jeep trailer hauling concrete girders in various lengths from 114' to 164'</text_data><comment_date>2020-03-23T00:00:00</comment_date></row><row _id="row-ptcn_23ic-ux5z" _uuid="00000000-0000-0000-FAA9-27E0B5B10C88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ptcn_23ic-ux5z"><intent_id>581033</intent_id><project_id>715440</project_id><text_data>We used a dingo to push gravel around and filled in potholes in the parking lots</text_data><comment_date>2013-07-25T00:00:00</comment_date></row><row _id="row-tpn8-j4qv-bcb2" _uuid="00000000-0000-0000-3AA6-1EB6E80C93A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tpn8-j4qv-bcb2"><intent_id>829568</intent_id><project_id>817771</project_id><text_data>Job actually started on December 21, 2016 and completed on December 30. 2016</text_data><comment_date>2017-04-30T00:00:00</comment_date></row><row _id="row-ju24~in56.tbqe" _uuid="00000000-0000-0000-AF61-BB3175CEBEC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ju24~in56.tbqe"><intent_id>896280</intent_id><project_id>839392</project_id><text_data>Filed by L. Rachael Coe-Please find enclosed our Intent to Pay Prevailing Wage exemption request for Regency, NW Construction Inc. for the project referenced above, along with the $40 filing fee.Below are questions and answers concerning our services utilizing underground locates using Ground-Penetrating Radar (GPR) imaging at this prevailing-wage project:1. What is the purpose of this awarding agency�s Public works project? To provide underground locates using ground-penetrating radar (GPR) imaging.2. Does this project entail the remodeling or new construction of a facility? No, we will only provide information of underground locates.3. If your firm is working upon a type of building system, what type of system is involved? We only provide underground locates using GPR imaging.4. What specific tasks did your employees perform? They will only provide underground locates using GPR equipment.5. What, if any, tools did your employees use in the performance of those tasks? GPR Equipment: SIR 3000 Unit (manufactured by Geophysical Survey Systems, Inc.)6. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing the tasks? No, they will only use the GPR equipment to provide information concerning underground locates.7. Are you going to be hiring any subcontractors for the project? NoThank you for your assistance! If you have any questions, please contact me at 425-445-7675 or at Rachael@SRImaging.comSincerelyL Rachael CoeFinance Manager</text_data><comment_date>2018-04-02T00:00:00</comment_date></row><row _id="row-b3xf-jqya_6pwk" _uuid="00000000-0000-0000-FB3B-EE9F1642DB53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b3xf-jqya_6pwk"><intent_id>1465760</intent_id><project_id>1132399</project_id><text_data>#7720</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-d3ji_pfdr.ipry" _uuid="00000000-0000-0000-699F-C9B29307A0BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d3ji_pfdr.ipry"><intent_id>756320</intent_id><project_id>789428</project_id><text_data>#1 Wiring of ductless heat pump#2 Single family dwelling#3 Detached Garage one level home#4 Individual homea.) no  b.) no  c.) yes d.) no e.) no f.) no g.) no h.) no I.) no j.) no k.) no#5 n/a#6 N/a#7 N/A#8 n/a</text_data><comment_date>2016-04-13T00:00:00</comment_date></row><row _id="row-g42f_89mq_exah" _uuid="00000000-0000-0000-E9A0-C873F29A38FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g42f_89mq_exah"><intent_id>1265050</intent_id><project_id>1009726</project_id><text_data>H&amp;W 9.47, PENSION 8.20, VACATION, 3.98, HOLIDAY 1.43</text_data><comment_date>2022-09-08T00:00:00</comment_date></row><row _id="row-wnue.8wkb_bpj3" _uuid="00000000-0000-0000-7F68-630E43B07FBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wnue.8wkb_bpj3"><intent_id>1132155</intent_id><project_id>945299</project_id><text_data>0921511</text_data><comment_date>2021-03-29T00:00:00</comment_date></row><row _id="row-9hdt.s766.axcn" _uuid="00000000-0000-0000-AC9D-560AB07E5501" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9hdt.s766.axcn"><intent_id>1343884</intent_id><project_id>1065910</project_id><text_data>Motor Patrol Grader = Vac Truck Operator</text_data><comment_date>2023-07-12T00:00:00</comment_date></row><row _id="row-v3ff_djq7_98er" _uuid="00000000-0000-0000-641A-4D867CEB75D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3ff_djq7_98er"><intent_id>843208</intent_id><project_id>825444</project_id><text_data>#1 replace HVAC system #2 residential apartment unit #3 1  #4a) no b) no c) yes d) no e) no f) no g)no h) No I) no J) no K) no L) NO #5) yes #6) yes #7)yes #8) no</text_data><comment_date>2017-06-26T00:00:00</comment_date></row><row _id="row-megn.gkeb_9gvm" _uuid="00000000-0000-0000-F32E-E38E18963153" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-megn.gkeb_9gvm"><intent_id>649894</intent_id><project_id>735854</project_id><text_data>Form filed by: Rip Martin</text_data><comment_date>2014-08-22T00:00:00</comment_date></row><row _id="row-4r8s~6kp6-6mip" _uuid="00000000-0000-0000-5D42-3B5895F3B7AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4r8s~6kp6-6mip"><intent_id>600536</intent_id><project_id>665979</project_id><text_data>Form Filed by: Steve Davis</text_data><comment_date>2013-10-21T00:00:00</comment_date></row><row _id="row-dhn5_pkj4_ipfp" _uuid="00000000-0000-0000-B476-25A6FE0C0362" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dhn5_pkj4_ipfp"><intent_id>569264</intent_id><project_id>701951</project_id><text_data>He will be driving/operating a Self-Loader</text_data><comment_date>2013-05-13T00:00:00</comment_date></row><row _id="row-apin.wcw4~kzir" _uuid="00000000-0000-0000-7202-4B0A3A37D99D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-apin.wcw4~kzir"><intent_id>659962</intent_id><project_id>746013</project_id><text_data>The installation is on IPEMA certified engineered wood fiber for playgrounds.</text_data><comment_date>2014-10-20T00:00:00</comment_date></row><row _id="row-q9ba~rzys.xxr9" _uuid="00000000-0000-0000-C267-A9E9204DFF7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9ba~rzys.xxr9"><intent_id>1053979</intent_id><project_id>916713</project_id><text_data>S029811</text_data><comment_date>2020-04-27T00:00:00</comment_date></row><row _id="row-v74i-7ajg_jmff" _uuid="00000000-0000-0000-EFA8-F5A5C3141417" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v74i-7ajg_jmff"><intent_id>491435</intent_id><project_id>678382</project_id><text_data>Health &amp; Welfare  =  $7.23Pensions  =  $14.02Vacation  =  $0.00Apprentice Training = $.53Other Bona Fide Fringes = $.45</text_data><comment_date>2011-11-30T00:00:00</comment_date></row><row _id="row-yziv-b3he_qffb" _uuid="00000000-0000-0000-756E-81753EB8939D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yziv-b3he_qffb"><intent_id>531945</intent_id><project_id>695071</project_id><text_data>Crestview Terrace 2000 N. Alder Ellensburg, Wa 989262012082 #112012083 #122012084 #172012085 #182012086 #212012087 #222012088 #272012089 #282012090 #292012091 #302012092 #392012093 #402012094 #432012095 #442012096 #752012097 #76</text_data><comment_date>2012-08-30T00:00:00</comment_date></row><row _id="row-6ifs-kim5_tqn7" _uuid="00000000-0000-0000-15D0-919A3DC765A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ifs-kim5_tqn7"><intent_id>594321</intent_id><project_id>710799</project_id><text_data>Landscape and irrigation repairlandscape small islands and lawn and irrigation repair   using shovels and rakes and a bobcat owner</text_data><comment_date>2013-09-17T00:00:00</comment_date></row><row _id="row-ijcf-x5ih.ja4s" _uuid="00000000-0000-0000-2DA4-1CD2122F576B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijcf-x5ih.ja4s"><intent_id>858865</intent_id><project_id>831109</project_id><text_data>PO# P127943 R089422</text_data><comment_date>2017-09-11T00:00:00</comment_date></row><row _id="row-dgqn_rgbw_bujx" _uuid="00000000-0000-0000-AABE-6750A0FF8DAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgqn_rgbw_bujx"><intent_id>765585</intent_id><project_id>787382</project_id><text_data>Filed by Marcie Jarvis</text_data><comment_date>2016-06-01T00:00:00</comment_date></row><row _id="row-7ikx.tk7z_2a6z" _uuid="00000000-0000-0000-9E92-A1F849F69A46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ikx.tk7z_2a6z"><intent_id>689985</intent_id><project_id>760358</project_id><text_data>The project mainly consists of installing a wood fence with metal meshing. City employees already cleaned up debris along the fence line, but the contractor expects some debris to be in the job site and minor cleanup/trimming will might need to be done in order to install the fence. Landscaping may not be necessary depending on the situation of the fence line.</text_data><comment_date>2015-04-20T00:00:00</comment_date></row><row _id="row-876a~qdft_ebqr" _uuid="00000000-0000-0000-541F-F54507CDE118" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-876a~qdft_ebqr"><intent_id>1150220</intent_id><project_id>964161</project_id><text_data>Install cat6 data drops inside Pioneer Middle School, Mt. View school</text_data><comment_date>2021-06-07T00:00:00</comment_date></row><row _id="row-uhha_i4rc.95nx" _uuid="00000000-0000-0000-1AF6-0D45184C5620" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uhha_i4rc.95nx"><intent_id>709594</intent_id><project_id>768029</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2015-07-23T00:00:00</comment_date></row><row _id="row-agvf~5ztv_pv68" _uuid="00000000-0000-0000-1800-FEA3F38B28E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-agvf~5ztv_pv68"><intent_id>695174</intent_id><project_id>756070</project_id><text_data>WORKER&amp;#39;S COMP NUMBER 625739 OREGON SAIF COMPANY.  POLICY TRANSFERRABLE TO WASHINGTON STATE</text_data><comment_date>2015-05-18T00:00:00</comment_date></row><row _id="row-usa8_5uj2-ermn" _uuid="00000000-0000-0000-D614-C431B0FFA086" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-usa8_5uj2-ermn"><intent_id>531170</intent_id><project_id>689776</project_id><text_data>Fringe breakdown: Painters Union - Health/Welfare 6.40, IUPAT Pension 4.87, WW Pension 3.54, Industry Fund .25, Apprenticeship .50, LMCF .05</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-293d_xkns_ns6h" _uuid="00000000-0000-0000-F3C1-CE1141AE066B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-293d_xkns_ns6h"><intent_id>1180016</intent_id><project_id>946439</project_id><text_data>401K $1.08, Vacation PTO $3.71, Holiday $2.07, Training $1.15</text_data><comment_date>2021-10-05T00:00:00</comment_date></row><row _id="row-y3m3~43gu_kjxt" _uuid="00000000-0000-0000-6DF0-17E2750014E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y3m3~43gu_kjxt"><intent_id>702559</intent_id><project_id>764545</project_id><text_data>Truck Drivers / Other Trucks = Oil Distributor Driver (Asphalt Surface Treatment - Sealcoat)</text_data><comment_date>2015-06-22T00:00:00</comment_date></row><row _id="row-pbvp-8jrr-rtzr" _uuid="00000000-0000-0000-FB58-9C10B83771EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbvp-8jrr-rtzr"><intent_id>748848</intent_id><project_id>786101</project_id><text_data>Install playground chips into play areas.</text_data><comment_date>2016-02-28T00:00:00</comment_date></row><row _id="row-v3hj~h4bh.6fem" _uuid="00000000-0000-0000-C872-1AFE325E4E06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3hj~h4bh.6fem"><intent_id>818293</intent_id><project_id>805346</project_id><text_data>Filed by L. Rachael CoeUnderground locates using ground-penetrating radar (GPR)</text_data><comment_date>2017-02-28T00:00:00</comment_date></row><row _id="row-i4bp_xmgs-fuu3" _uuid="00000000-0000-0000-7B03-43C374E8AE18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i4bp_xmgs-fuu3"><intent_id>1113021</intent_id><project_id>945354</project_id><text_data>PJ1US.00008522</text_data><comment_date>2021-01-04T00:00:00</comment_date></row><row _id="row-jk3z~4b8h~6azk" _uuid="00000000-0000-0000-01AF-CA5046333295" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jk3z~4b8h~6azk"><intent_id>1224255</intent_id><project_id>1007691</project_id><text_data>Invoice 909078-00 / Labor SRO 1914775</text_data><comment_date>2022-04-08T00:00:00</comment_date></row><row _id="row-7b3c~37gv~gft3" _uuid="00000000-0000-0000-180F-497E4A41B53E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7b3c~37gv~gft3"><intent_id>701739</intent_id><project_id>762404</project_id><text_data>FRINGE RATE:PENSION:       9.95H &amp; W          6.77APPR            .65ANNUITY        4.75IMPACT          .29INDUSTRY        .02TOTAL FRINGE  22.43</text_data><comment_date>2015-06-18T00:00:00</comment_date></row><row _id="row-kxf3~22wj_s529" _uuid="00000000-0000-0000-3E1B-0C82EA81B568" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kxf3~22wj_s529"><intent_id>1417032</intent_id><project_id>1115851</project_id><text_data>J00230430 - Intent</text_data><comment_date>2024-04-06T00:00:00</comment_date></row><row _id="row-deur.3a4z_uzas" _uuid="00000000-0000-0000-5AD0-0C0D183E2755" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-deur.3a4z_uzas"><intent_id>1185750</intent_id><project_id>983820</project_id><text_data>Oct 2021- GSP - Jackson Park Golf Course &amp; Licorice FernWO #89068Hand Pulling and grubbing invasive control and weeding with hand tools</text_data><comment_date>2021-10-15T00:00:00</comment_date></row><row _id="row-96tq-jeca~8r8v" _uuid="00000000-0000-0000-10AD-400E1752197C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96tq-jeca~8r8v"><intent_id>1165604</intent_id><project_id>973338</project_id><text_data>ACI JOB # 21-027</text_data><comment_date>2021-08-03T00:00:00</comment_date></row><row _id="row-jr5r_34bk~g2kh" _uuid="00000000-0000-0000-CA88-19F26999A9BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jr5r_34bk~g2kh"><intent_id>663341</intent_id><project_id>747859</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NODANIEL GLEASON2421 ABERDEEN AVEABERDEEN 98520</text_data><comment_date>2014-10-30T00:00:00</comment_date></row><row _id="row-7adh_ysub-9ywg" _uuid="00000000-0000-0000-256E-6A59A55E8D4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7adh_ysub-9ywg"><intent_id>532789</intent_id><project_id>686866</project_id><text_data>transfer truck</text_data><comment_date>2012-09-05T00:00:00</comment_date></row><row _id="row-eb4i_36et.zqpn" _uuid="00000000-0000-0000-9AEB-84B82D781398" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eb4i_36et.zqpn"><intent_id>1084567</intent_id><project_id>931012</project_id><text_data>9856837</text_data><comment_date>2020-08-31T00:00:00</comment_date></row><row _id="row-pjjh~tamj.66tv" _uuid="00000000-0000-0000-05CB-C0DD48D8821F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjjh~tamj.66tv"><intent_id>1216011</intent_id><project_id>1002446</project_id><text_data>Invoice 910011-00 / Labor SRO 1915442</text_data><comment_date>2022-03-07T00:00:00</comment_date></row><row _id="row-uxuv~9356~6jah" _uuid="00000000-0000-0000-5D55-63D843D9A22A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uxuv~9356~6jah"><intent_id>543449</intent_id><project_id>696390</project_id><text_data>THis should only be King County Rates, a mistake was made, and I accidently selected Pierce County, thought when I entered King county the Pierce County would go away.</text_data><comment_date>2012-11-08T00:00:00</comment_date></row><row _id="row-jwhp-6xbm_vdje" _uuid="00000000-0000-0000-4A88-8057C022DFBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jwhp-6xbm_vdje"><intent_id>693175</intent_id><project_id>761675</project_id><text_data>REF POWERCOM JOB#922770</text_data><comment_date>2015-05-07T00:00:00</comment_date></row><row _id="row-xmdx~5ccz-2die" _uuid="00000000-0000-0000-0B97-683C93B06A93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xmdx~5ccz-2die"><intent_id>1242987</intent_id><project_id>991038</project_id><text_data>STONEWAY CONCRETE IS A MATERIAL SUPPLIER</text_data><comment_date>2022-06-21T00:00:00</comment_date></row><row _id="row-kun7.3mj9.kwip" _uuid="00000000-0000-0000-B148-7CB66FDCCD2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kun7.3mj9.kwip"><intent_id>884392</intent_id><project_id>841934</project_id><text_data>#1 Kitchen wall fan. #2 Single family dwelling stick frame. #3 2 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2018-01-22T00:00:00</comment_date></row><row _id="row-z55x_5qqu~sh56" _uuid="00000000-0000-0000-F6EF-9B8259E174E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z55x_5qqu~sh56"><intent_id>519792</intent_id><project_id>690557</project_id><text_data>Squeegee apply polyurethane on base provided by others and broadcast rubber pellets onto the coating.</text_data><comment_date>2012-07-23T00:00:00</comment_date></row><row _id="row-r8x5_se2w.24nq" _uuid="00000000-0000-0000-B71A-3477455D526F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r8x5_se2w.24nq"><intent_id>917672</intent_id><project_id>855795</project_id><text_data>(1)INSULATION (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO, B-NO, C-YES, D-NO, E-NO, F-NO, G-NO, H-NO, I-NO, J-NO, K-? (5)YES (6)YES (7)NO (8)NO</text_data><comment_date>2018-07-12T00:00:00</comment_date></row><row _id="row-cwur~kaq7~3hnu" _uuid="00000000-0000-0000-DD24-7E37CB52ABF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cwur~kaq7~3hnu"><intent_id>1469220</intent_id><project_id>1146388</project_id><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-7bit~xy8t-kd72" _uuid="00000000-0000-0000-8850-E232C7AAC1B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7bit~xy8t-kd72"><intent_id>885324</intent_id><project_id>842337</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2018-01-26T00:00:00</comment_date></row><row _id="row-qkzx_chty_5e5g" _uuid="00000000-0000-0000-FBC8-4A7F2C2619CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qkzx_chty_5e5g"><intent_id>1134530</intent_id><project_id>918142</project_id><text_data>Telecom Tech: Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.Contract Number: SC-4201905-003-27-3000</text_data><comment_date>2021-04-08T00:00:00</comment_date></row><row _id="row-btju~u4rq~4spb" _uuid="00000000-0000-0000-D6FE-328EEF130F90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-btju~u4rq~4spb"><intent_id>507083</intent_id><project_id>685638</project_id><text_data>Truck Driver/Other Trucks includes Pickup Trucks and 4000 Gallon Water Trucks.</text_data><comment_date>2012-04-11T00:00:00</comment_date></row><row _id="row-i7yc.puae.ib8i" _uuid="00000000-0000-0000-B78A-507E3513579F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7yc.puae.ib8i"><intent_id>903486</intent_id><project_id>838913</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER</text_data><comment_date>2018-05-09T00:00:00</comment_date></row><row _id="row-tz8r.brpw.j2ma" _uuid="00000000-0000-0000-9179-2DF9CF19FE9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tz8r.brpw.j2ma"><intent_id>936613</intent_id><project_id>862840</project_id><text_data>Filed by Nanette Gehlen</text_data><comment_date>2018-10-01T00:00:00</comment_date></row><row _id="row-f94w~ibyd_k7fg" _uuid="00000000-0000-0000-D27E-D54291EF4032" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f94w~ibyd_k7fg"><intent_id>502694</intent_id><project_id>541338</project_id><text_data>penhall job # 230686</text_data><comment_date>2012-03-05T00:00:00</comment_date></row><row _id="row-rjgg-zzxs_d4by" _uuid="00000000-0000-0000-A2BB-57C66559F9FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rjgg-zzxs_d4by"><intent_id>1028798</intent_id><project_id>897835</project_id><text_data>Job 2381417  PSF 2018-183$1.84 PTOFringe Benefits:$9.24 H&amp;W$5.51 Pension$2.00 IAP$0.12 Occup Hazard$0.10 International Training Fund$1.15 Apprenticeship, Industry Fund, LMCT_____$18.12</text_data><comment_date>2019-12-27T00:00:00</comment_date></row><row _id="row-jtxb_kfxv_gwfy" _uuid="00000000-0000-0000-9C2E-A7D521E6DD05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jtxb_kfxv_gwfy"><intent_id>670293</intent_id><project_id>750979</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.   HVAC replacement.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?   Single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? SFR(a) Any commercial use in the structure? no(b) (b) Any retail use in the structure? no(c) (c) Permanent residence only? yes(d) (d) Rehabilitation house? no(e)  (e) Transitional housing? no(f) (f) Communal dining facility? no(g)  (g) Treatment services? no(h) (h) Dormitories? no(i) (i) Counseling? no(j) (j) Is each room and/or bed in the structure rented separately? N/a(k) (k) Other? no#5 - Does each dwelling unit have its own self-contained kitchen? N/a#6 - Does each dwelling unit have its own bathroom?  N/a#7 - Is there a community facility or manager�s office on site? no#8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2014-12-17T00:00:00</comment_date></row><row _id="row-6ycs.v528_q9qp" _uuid="00000000-0000-0000-4B1F-0AD833F39B19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ycs.v528_q9qp"><intent_id>448986</intent_id><project_id>656187</project_id><text_data>Powderman helper</text_data><comment_date>2011-03-29T00:00:00</comment_date></row><row _id="row-qigs~wu7d-rv7m" _uuid="00000000-0000-0000-D227-2A978E28B29B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qigs~wu7d-rv7m"><intent_id>607497</intent_id><project_id>724248</project_id><text_data>Work performed: provided raking of shrub beds, provided and installed (3) 5 gallon Otto Luken Laurels and (1) 5 gallon Abelia, provided and installed bark dust in an area that measured 20'x20'. All work was performed using hand tools.</text_data><comment_date>2013-12-06T00:00:00</comment_date></row><row _id="row-aegs-vau2-9qqg" _uuid="00000000-0000-0000-7881-3FD40F72457E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aegs-vau2-9qqg"><intent_id>1140637</intent_id><project_id>900189</project_id><text_data>Job 2020-141</text_data><comment_date>2021-04-29T00:00:00</comment_date></row><row _id="row-rzqh~dkad~v4g3" _uuid="00000000-0000-0000-B545-1F01ACB7F845" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzqh~dkad~v4g3"><intent_id>598078</intent_id><project_id>674890</project_id><text_data>ST#11-437-4</text_data><comment_date>2013-10-07T00:00:00</comment_date></row><row _id="row-6uyz~nqqn.k6hq" _uuid="00000000-0000-0000-A1A6-0DFAC4885167" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6uyz~nqqn.k6hq"><intent_id>917002</intent_id><project_id>855557</project_id><text_data>Installation of 1 CAT6 cable from workstation to IDF which can be used for either telephone (voice over distance) or data (bits and bytes) connection within the telecommunications system.  All work will be performed indoors.</text_data><comment_date>2018-07-10T00:00:00</comment_date></row><row _id="row-ejyr~6n4j-npz2" _uuid="00000000-0000-0000-7EB2-D3DB6383B9A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ejyr~6n4j-npz2"><intent_id>1060350</intent_id><project_id>920103</project_id><text_data>SR#: 46959550</text_data><comment_date>2020-05-26T00:00:00</comment_date></row><row _id="row-epse~pcnp-b37t" _uuid="00000000-0000-0000-828F-122BB726B118" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-epse~pcnp-b37t"><intent_id>1114683</intent_id><project_id>946273</project_id><text_data>Haz Waste workers to clear are of all debris using shovel/rake/broomMotor Pat Grader to vacuum area of all contaminated liquids</text_data><comment_date>2021-01-12T00:00:00</comment_date></row><row _id="row-ijje~9duu_5j3v" _uuid="00000000-0000-0000-A877-4CA8848B5447" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijje~9duu_5j3v"><intent_id>660657</intent_id><project_id>735639</project_id><text_data>PEASE AND SONS HIRED US</text_data><comment_date>2014-10-16T00:00:00</comment_date></row><row _id="row-dfnc_2hpt_9hpt" _uuid="00000000-0000-0000-CA1B-4AF83A940CB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfnc_2hpt_9hpt"><intent_id>1114827</intent_id><project_id>946361</project_id><text_data>Relocate several telephone extensions within the existing building</text_data><comment_date>2021-01-12T00:00:00</comment_date></row><row _id="row-rh88~a2yq_5w6e" _uuid="00000000-0000-0000-19E1-4885AA0579AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rh88~a2yq_5w6e"><intent_id>651576</intent_id><project_id>743231</project_id><text_data>Form filed by: Karen J Johnson</text_data><comment_date>2014-08-29T00:00:00</comment_date></row><row _id="row-24pn~r6ew_3e59" _uuid="00000000-0000-0000-997C-11770A610E5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-24pn~r6ew_3e59"><intent_id>517785</intent_id><project_id>689977</project_id><text_data>The scope for this project is to provide and install 24 SM fiber from bldg 18 to bldg 29</text_data><comment_date>2012-06-19T00:00:00</comment_date></row><row _id="row-ayvi-5jvh~zzaw" _uuid="00000000-0000-0000-559C-F24B46FC80B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ayvi-5jvh~zzaw"><intent_id>944882</intent_id><project_id>856818</project_id><text_data>Filed by John Jorgensen - Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2018-11-08T00:00:00</comment_date></row><row _id="row-64se~vqx4.4b86" _uuid="00000000-0000-0000-4CAF-E955D2911305" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-64se~vqx4.4b86"><intent_id>622323</intent_id><project_id>731893</project_id><text_data>Form filed by: Amber WhitneyTools Used: Screw gun, driver gun, screwdrivers, hammer, sawsall, grinder, skillsawEquipment Used: Forklift, Scissorlift, Provided by Energy Northwest. Owner to Operate.Vehicles Used: 2003 Chevy truck, 2004 Chevy truckDuties: Remove door siding, modify frame, replace siding and frame.</text_data><comment_date>2014-03-28T00:00:00</comment_date></row><row _id="row-2e8n_8ces~w8ya" _uuid="00000000-0000-0000-5E64-763EEC009526" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2e8n_8ces~w8ya"><intent_id>612645</intent_id><project_id>727597</project_id><text_data>Tune and Clean Furnace</text_data><comment_date>2014-01-17T00:00:00</comment_date></row><row _id="row-jtaf-pa7e.6xxi" _uuid="00000000-0000-0000-7F1B-F2ABA1561C6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jtaf-pa7e.6xxi"><intent_id>575200</intent_id><project_id>713249</project_id><text_data>GENERAL LABORERS USE HAND TOOLS SUCH AS SHOVELS AND RAKE AND DO MANUAL TASKS SUCH AS INSTALLING SILT FENCE AND HAY. OTHER TRUCKS INCLUDE LOWBOY AND/OR WATERTRUCKS.</text_data><comment_date>2013-06-13T00:00:00</comment_date></row><row _id="row-f4r8_q3ue-w3na" _uuid="00000000-0000-0000-79DF-BFF283A97A9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f4r8_q3ue-w3na"><intent_id>1281338</intent_id><project_id>984442</project_id><text_data>Western Industries is supplying this intent as an offsite steel manufacturer and not as a specialty subcontractor, therefore will not have any employees on the project site. The owner operators will be performing work offsite.</text_data><comment_date>2022-11-04T00:00:00</comment_date></row><row _id="row-8fqi_tzi2~edcv" _uuid="00000000-0000-0000-C267-82393A60EF00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8fqi_tzi2~edcv"><intent_id>777802</intent_id><project_id>796712</project_id><text_data>Other truck = lowboy to deliver equipment</text_data><comment_date>2016-07-27T00:00:00</comment_date></row><row _id="row-m88y~wvkn-q5dg" _uuid="00000000-0000-0000-82A5-D937DBCB5C4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m88y~wvkn-q5dg"><intent_id>699230</intent_id><project_id>764283</project_id><text_data>Work performed by the Telecommunication Technicians is installing Cat5e cabling for data indoors.  The purpose of the data cabling being installed is for computer networking.</text_data><comment_date>2015-06-09T00:00:00</comment_date></row><row _id="row-xh4t~gvii_avpn" _uuid="00000000-0000-0000-9876-80C390D5B427" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xh4t~gvii_avpn"><intent_id>669231</intent_id><project_id>750475</project_id><text_data>Pick-up halon cylinders for hydro-static testing, re-building and refilling, returning them for reinstallation.</text_data><comment_date>2014-12-11T00:00:00</comment_date></row><row _id="row-g9d4~tvaa.n4hs" _uuid="00000000-0000-0000-4971-E0CFBB13521A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g9d4~tvaa.n4hs"><intent_id>646624</intent_id><project_id>739078</project_id><text_data>Form filed by: Jeanette Kitterman</text_data><comment_date>2014-08-08T00:00:00</comment_date></row><row _id="row-v7w2_nyp5-ptzb" _uuid="00000000-0000-0000-7859-60086D7ACBF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v7w2_nyp5-ptzb"><intent_id>852961</intent_id><project_id>829254</project_id><text_data>Weekly Landscape maintenance</text_data><comment_date>2017-08-07T00:00:00</comment_date></row><row _id="row-rjpk~b4ry~pq7y" _uuid="00000000-0000-0000-EB26-D8A8014EBE9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rjpk~b4ry~pq7y"><intent_id>472751</intent_id><project_id>454228</project_id><text_data>Correction notice - Awarding agency contact name is:  James Hansen</text_data><comment_date>2011-09-10T00:00:00</comment_date></row><row _id="row-zpe8-6vp2~ugqd" _uuid="00000000-0000-0000-4961-85C6F53F9CB4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zpe8-6vp2~ugqd"><intent_id>916817</intent_id><project_id>849625</project_id><text_data>Other truck - Water truck Other truck - lowboy heavy/duty trailer</text_data><comment_date>2018-07-10T00:00:00</comment_date></row><row _id="row-e28g.tqrn-9ybf" _uuid="00000000-0000-0000-5E4A-E8BA86A9B48F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e28g.tqrn-9ybf"><intent_id>604627</intent_id><project_id>723952</project_id><text_data>Filed by Misty Noel.</text_data><comment_date>2013-11-14T00:00:00</comment_date></row><row _id="row-qfuv~zix4_uxny" _uuid="00000000-0000-0000-C4FC-85F3DD839651" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qfuv~zix4_uxny"><intent_id>779635</intent_id><project_id>798772</project_id><text_data>Intents and affidavits for H and H Heating and Air:18207 E. Tall Tree, Spokane Valley, WA 99216314 W. Hannon, Spokane, WA 99205Total for this listing:$1,400.oo</text_data><comment_date>2016-08-03T00:00:00</comment_date></row><row _id="row-d76p_7h7y-yn9m" _uuid="00000000-0000-0000-3147-8C651D73B339" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d76p_7h7y-yn9m"><intent_id>644178</intent_id><project_id>738733</project_id><text_data>Planting 14 trees. Edging and sow dryland seed.</text_data><comment_date>2014-07-29T00:00:00</comment_date></row><row _id="row-8xbe_gbn6-ex4g" _uuid="00000000-0000-0000-4275-4E9212456906" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8xbe_gbn6-ex4g"><intent_id>716584</intent_id><project_id>766681</project_id><text_data>$18.13---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $11.13$ 9.82---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $ 2.82</text_data><comment_date>2015-08-25T00:00:00</comment_date></row><row _id="row-f5vb-3jfn.ish9" _uuid="00000000-0000-0000-A588-97D8EA6C6B43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f5vb-3jfn.ish9"><intent_id>580555</intent_id><project_id>712249</project_id><text_data>Job # 86566</text_data><comment_date>2013-07-11T00:00:00</comment_date></row><row _id="row-kgw6_j563-6vkf" _uuid="00000000-0000-0000-6E46-E074231628A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kgw6_j563-6vkf"><intent_id>614718</intent_id><project_id>724946</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2014-04-15T00:00:00</comment_date></row><row _id="row-rh69-gm23~ie39" _uuid="00000000-0000-0000-4A71-53D8EB85D646" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rh69-gm23~ie39"><intent_id>1239108</intent_id><project_id>1004912</project_id><text_data>sweeping using a truck mounted sweeper.</text_data><comment_date>2022-06-06T00:00:00</comment_date></row><row _id="row-tcd3.vtfy_agfv" _uuid="00000000-0000-0000-A44F-12EC622C64C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tcd3.vtfy_agfv"><intent_id>684565</intent_id><project_id>735159</project_id><text_data>&amp;quot;TRUCK DRIVER OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK; &amp;quot;POWER EQUIPMENT OPERATOR MOTOR PATROL GRADER FINISHER&amp;quot; - NOT MOTOR PATROL, VACTOR GUZZLER/VACCON SUPER SUCKER</text_data><comment_date>2015-03-19T00:00:00</comment_date></row><row _id="row-x3pf.nsnt_epna" _uuid="00000000-0000-0000-5159-FAAAF7350E50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3pf.nsnt_epna"><intent_id>986919</intent_id><project_id>885319</project_id><text_data>203494-002</text_data><comment_date>2019-06-24T00:00:00</comment_date></row><row _id="row-gupn.ft7t-gqbv" _uuid="00000000-0000-0000-0A43-9C43A9395A85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gupn.ft7t-gqbv"><intent_id>1019682</intent_id><project_id>898610</project_id><text_data>Suchanon Dr., Everson, WA 982471. Air seal, attic blow, crawl, mechanical ventilation 2. Single family 3. 1 4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2019-11-05T00:00:00</comment_date></row><row _id="row-kss5-ztke~p6qm" _uuid="00000000-0000-0000-2FB0-172562EA6A39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kss5-ztke~p6qm"><intent_id>532828</intent_id><project_id>695377</project_id><text_data>042206</text_data><comment_date>2012-09-06T00:00:00</comment_date></row><row _id="row-uwbs.g5hx.unvn" _uuid="00000000-0000-0000-BBA9-EE7774FE98F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwbs.g5hx.unvn"><intent_id>712173</intent_id><project_id>768839</project_id><text_data>Surface basketball court</text_data><comment_date>2015-08-05T00:00:00</comment_date></row><row _id="row-4dmp~jusr-53k8" _uuid="00000000-0000-0000-C9EF-C3FAC5334ADE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4dmp~jusr-53k8"><intent_id>944630</intent_id><project_id>845337</project_id><text_data>Filed by Lawrence Toimil</text_data><comment_date>2018-11-07T00:00:00</comment_date></row><row _id="row-cicu.9kfq_ggy6" _uuid="00000000-0000-0000-0A99-1C0139E22D61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cicu.9kfq_ggy6"><intent_id>1024249</intent_id><project_id>900735</project_id><text_data>38142</text_data><comment_date>2019-11-27T00:00:00</comment_date></row><row _id="row-2rsm_2pik-qa9d" _uuid="00000000-0000-0000-E0A6-7F2350CE0304" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2rsm_2pik-qa9d"><intent_id>553147</intent_id><project_id>703538</project_id><text_data>Form Filed By: Mike Jensen</text_data><comment_date>2013-01-23T00:00:00</comment_date></row><row _id="row-hzhp~pbhf~kefz" _uuid="00000000-0000-0000-F649-13057BD910A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hzhp~pbhf~kefz"><intent_id>1061926</intent_id><project_id>918152</project_id><text_data>Supply and install irrigation at a depth no greater than 24 inches using a mini excavator under 90 hp. Supply and install topsoil and bark as top dress using skidsteer under 90 hp and hand rakes for final finish. Supply and install plant and tree material using hand tools. Supply seeding in all new grass areas.</text_data><comment_date>2020-06-02T00:00:00</comment_date></row><row _id="row-pbx3_sy7s_j72f" _uuid="00000000-0000-0000-56D6-2BDA6893F7E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbx3_sy7s_j72f"><intent_id>453253</intent_id><project_id>665026</project_id><text_data>The scope of work for this project replace existing access points and install new access points for voice and computer network infrastructure.</text_data><comment_date>2011-04-27T00:00:00</comment_date></row><row _id="row-n9ht.7s6w_rhvu" _uuid="00000000-0000-0000-2A24-B914B1BB8A11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n9ht.7s6w_rhvu"><intent_id>679871</intent_id><project_id>742148</project_id><text_data>This Intent is to replace the erroneous Intent #660297 previously filed and approved. I used the wrong county, city and rate. ~Cheryll Mc Claren</text_data><comment_date>2015-02-18T00:00:00</comment_date></row><row _id="row-d5rq.e49v~2hh7" _uuid="00000000-0000-0000-D9AC-D3B4B7816C49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d5rq.e49v~2hh7"><intent_id>1198587</intent_id><project_id>991294</project_id><text_data>1.    Window Cleaning using only hand tools2.    Wayland Arms3.    4 story4.    A. No: B. No: C. Yes: D No: E No: F No: G No: H No: I No: J No: K No: I NA5.    Yes6.    Yes7.    Yes8.    No</text_data><comment_date>2021-12-10T00:00:00</comment_date></row><row _id="row-tmu7~aced-fxu4" _uuid="00000000-0000-0000-C401-45D4AD010637" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tmu7~aced-fxu4"><intent_id>1064704</intent_id><project_id>922143</project_id><text_data>09-20-032R</text_data><comment_date>2020-06-11T00:00:00</comment_date></row><row _id="row-sydw_ztzd~ut43" _uuid="00000000-0000-0000-80C6-6DD9A527B890" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sydw_ztzd~ut43"><intent_id>1133368</intent_id><project_id>956809</project_id><text_data>Elect tech(06)install cabling for new CCTV systeminside work</text_data><comment_date>2021-04-02T00:00:00</comment_date></row><row _id="row-ivhn~z7wx-4faq" _uuid="00000000-0000-0000-E7C9-4889BF8A25F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ivhn~z7wx-4faq"><intent_id>493483</intent_id><project_id>679327</project_id><text_data>042004</text_data><comment_date>2011-12-14T00:00:00</comment_date></row><row _id="row-rzfx.g2ym-x794" _uuid="00000000-0000-0000-4BE0-EA019584B54E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzfx.g2ym-x794"><intent_id>557729</intent_id><project_id>682336</project_id><text_data>Load and haul bark 3-5 yards of extra on stie soil from regrading site.  All dirt was loaded by hand and hauled with 3/4 ton truck and trailer.  Install 2 yards of topsoil over disrubted area and hand seed.</text_data><comment_date>2013-03-05T00:00:00</comment_date></row><row _id="row-yciu_7scd_nh3z" _uuid="00000000-0000-0000-11C3-13F1C2AFC51C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yciu_7scd_nh3z"><intent_id>988050</intent_id><project_id>864310</project_id><text_data>General Laborer: doing paperwork for pick plans</text_data><comment_date>2019-06-27T00:00:00</comment_date></row><row _id="row-f5gu.6hsf.psgj" _uuid="00000000-0000-0000-53D7-3A1CCA5D5066" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f5gu.6hsf.psgj"><intent_id>898405</intent_id><project_id>846921</project_id><text_data>Irrigation installation</text_data><comment_date>2018-04-12T00:00:00</comment_date></row><row _id="row-f898_u7xr.dj47" _uuid="00000000-0000-0000-449B-568F8849D67B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f898_u7xr.dj47"><intent_id>897945</intent_id><project_id>848041</project_id><text_data>Trade changed to Electrician - Inside - Journey Level 5/3/2018</text_data><comment_date>2018-05-03T00:00:00</comment_date></row><row _id="row-2wq3-tciy~af83" _uuid="00000000-0000-0000-D11C-DE7948B727CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2wq3-tciy~af83"><intent_id>933133</intent_id><project_id>859380</project_id><text_data>Owner Jonathan Pedro to perform all electrical work.</text_data><comment_date>2018-09-16T00:00:00</comment_date></row><row _id="row-bh5s-faz5_zsgs" _uuid="00000000-0000-0000-5655-324FBCFC3010" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bh5s-faz5_zsgs"><intent_id>1080435</intent_id><project_id>929157</project_id><text_data>Generally speaking, when maintenance/repair to artwork is �stand alone� such as a sculpture mounted to a structure, where the refurbishment of the artwork to its original state does not impact the structure, or require any alteration or repair to the structure it is attached to, the dept would not require registration as a construction contractor: Specifically, with respect to this enquiry, contractor registration is not required to perform the above scope of work. Kindest regards, Jesse L JamesonTechnical SpecialistConstruction Contractor Compliance12806 Gateway Dr S, Tukwila WA. 98168206-835-1107</text_data><comment_date>2020-09-07T00:00:00</comment_date></row><row _id="row-9a47-9kdz.7yfh" _uuid="00000000-0000-0000-F610-4E0E0B5D415E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9a47-9kdz.7yfh"><intent_id>975757</intent_id><project_id>855245</project_id><text_data>PN  # 57013PDX</text_data><comment_date>2019-05-03T00:00:00</comment_date></row><row _id="row-qkyi.z4hh.tcha" _uuid="00000000-0000-0000-4D6E-8EA39B642033" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qkyi.z4hh.tcha"><intent_id>640504</intent_id><project_id>739128</project_id><text_data>-- On 7/22/2013:--You have requested a correction related to this years current Statement of Intent filed by EBS. In it you have stated that we do not have an active Contractors Registration showing for us. As per my conversation dated 7-22-13 with Brianna in your office. EBS has not been required in previous filings due to the nature of this contract. Brianna asked me to describe the worked performed under this contract. This contract requires our vacuum truck driver / operator, and assistant to drive the parking lot at the campus and vacuum the sludge from storm drains.</text_data><comment_date>2014-07-11T00:00:00</comment_date></row><row _id="row-7q6q_dz79-w4gj" _uuid="00000000-0000-0000-0315-D3F30D5804E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7q6q_dz79-w4gj"><intent_id>468738</intent_id><project_id>671079</project_id><text_data>General Laborer:  Erosion Control Installation / Maintenance; Construction Debris and/or Material Pick-up; Raking, Shoveling - Tools:  Small Hand Held; Sledge Hammer - Fence Post Pounder; Rake; ShovelTruck Driver Other:  Tractor w/ 3-Axle Lowboy (Equipment) Trailer</text_data><comment_date>2011-07-27T00:00:00</comment_date></row><row _id="row-6v3g-p793~bt55" _uuid="00000000-0000-0000-21AB-875330E716B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6v3g-p793~bt55"><intent_id>786844</intent_id><project_id>801530</project_id><text_data>xxx</text_data><comment_date>2016-09-01T00:00:00</comment_date></row><row _id="row-hs8w~2kdy-yu5d" _uuid="00000000-0000-0000-DC8A-D9D5B0BCEB1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hs8w~2kdy-yu5d"><intent_id>683636</intent_id><project_id>745387</project_id><text_data>We are a subcontractor to SRV Construction. Our portion of this project consists of the final seeding and replanting of vegetation on disturbed. Our hydroseeder will be used.The contractor&amp;#39;s work on this project is &amp;quot;provides all labor, equipment, tools, goods, material and incidentals necessary to install approximately 3,100 lineal feet of Class 52 8&amp;quot; Ductile Iron pipe, 180 lineal feet of Class 52 4&amp;quot; Ductile Iron pipe and all necessary appurtenances associated with the pipe installation in order to provide water service to approximately 80 existing District customers. Such construction shall be performed while maintaining service to existing 8&amp;quot; and 6&amp;quot; AC mains. The project location is on Rhodora Heights Rd and on 7th Pl. SE near the City of Lake Stevens, in Snohomish Washington.&amp;quot;</text_data><comment_date>2015-03-13T00:00:00</comment_date></row><row _id="row-mc47~z9uf.46n6" _uuid="00000000-0000-0000-F118-219EA1CD3A6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mc47~z9uf.46n6"><intent_id>969337</intent_id><project_id>877460</project_id><text_data>#1 � The crew will be installing a ductless heat pump.#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2019-04-03T00:00:00</comment_date></row><row _id="row-r52m.ehsz_kx5d" _uuid="00000000-0000-0000-54DA-A6AC035D4527" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r52m.ehsz_kx5d"><intent_id>1463652</intent_id><project_id>1143556</project_id><text_data>The trucks we use are a 2015  1800 horsepower Freightliner 3 axle tanker truck with a 2 axle tanker trailer.  It is equipped with fuel pump, hose and filters for fueling the aircraft.  It has an 80,000 pound capacity with the truck and trailer.  The max we haul is 7200 gallons of Jet A fuel for our aircraft.</text_data><comment_date>2024-09-19T00:00:00</comment_date></row><row _id="row-639s-yftz~te95" _uuid="00000000-0000-0000-89C3-9913C24361C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-639s-yftz~te95"><intent_id>1469338</intent_id><project_id>1126207</project_id><text_data>KG4220</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-j4h5_cxjv~ti6n" _uuid="00000000-0000-0000-914D-A0591B5EFC89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j4h5_cxjv~ti6n"><intent_id>1469449</intent_id><project_id>1146513</project_id><text_data>ALC NW provides digital controls design, programming and controllers. All on-site work is performed by our subcontractor who runs low voltage wiring and installs controllers.</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-u3i4-6g6m-a8n3" _uuid="00000000-0000-0000-8752-E57E25C4D721" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u3i4-6g6m-a8n3"><intent_id>1469185</intent_id><project_id>1138881</project_id><text_data>9953432</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-w4zq~wfhr_en68" _uuid="00000000-0000-0000-1085-17B4BB2B7DC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w4zq~wfhr_en68"><intent_id>1465545</intent_id><project_id>1139619</project_id><text_data>#1 - Take Out Insulation, #2 - Single family dwelling, #3 - 1 Stories, #4 - (a) No, (b) No, (c) Yes, (d) No, (e) No, (f) No, (g) No, (h) No, (i) No, (j) No, (k) No, (l) No, #5 - No, #6 - No, #7 - No, #8 - No.</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-inuq.g8su.8tui" _uuid="00000000-0000-0000-F209-AEBA8C77F2A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inuq.g8su.8tui"><intent_id>1465883</intent_id><project_id>1091176</project_id><text_data>Remove dead Shubs and prune the trees around the perimeter of the District's Waterville Substation</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-gn69_tkan_x6bq" _uuid="00000000-0000-0000-C67C-0ED59D9A4DFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gn69_tkan_x6bq"><intent_id>985852</intent_id><project_id>884758</project_id><text_data>FILED BY SHELLEY ANKER(1) Prime Contractor: Tub Cove Inc.7801 Lake City Way NESeattle, Wa 98115Contractor # TUBCOC191BKUBI: 602940234(2) University of Washington ( Hiring entity�not a Contractor)Contact: Graham SherwoodHousing &amp; Food Services/PurchasingP 206-685-7094Job Site Addresses: Blakely VillageLaurel Village 4747 30th Ave NE4200 Mary Gates Way Seattle, WaSeattle, Wa(3) Work Description: Removing old bath surround; prepping walls in make ready condition to prepare for installation of new Tub Cove laminate surround. Install Tub Cove laminate surround.(4) Type of Structure: Structure is a single family residential apartment.(5) Structure stories or levels: Stories or levels varies. The large percentage of the structures are 4 plex family housing. Some buildings are 2 story duplex housing.(6) Building Use: Buildings are used for student family housing.(7) Answer �yes� or �no�a. No � commercial use in structureb. No � retail use in structurec. No � Permanent residenced. No � Rehab housee. No � Transitional housingf. No - communal dining facilityg. No � Treatment servicesh. No � Assisted livingi. No - Dormitoriesj. No - Counselingk. No � separate room/bed rentall. No � other services/usesm. Yes � each unit has its own self-contained kitchenn. Yes � each dwelling unit has its own bathroomo. Yes � there is a community�s facility or manager�s office on sitep. No � No part of structures are used by members of the general public</text_data><comment_date>2019-06-19T00:00:00</comment_date></row><row _id="row-sadw-8898~8whm" _uuid="00000000-0000-0000-0E5C-ACD2569E314C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sadw-8898~8whm"><intent_id>1135699</intent_id><project_id>958112</project_id><text_data>504-168-00</text_data><comment_date>2021-04-13T00:00:00</comment_date></row><row _id="row-cbqw~47uj.mg63" _uuid="00000000-0000-0000-A2D9-A10E28A13D2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cbqw~47uj.mg63"><intent_id>699675</intent_id><project_id>745776</project_id><text_data>�Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.&amp;quot;</text_data><comment_date>2015-06-10T00:00:00</comment_date></row><row _id="row-vxw6.u2e2~x3x3" _uuid="00000000-0000-0000-ED88-BAD0DCD84BB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vxw6.u2e2~x3x3"><intent_id>1252167</intent_id><project_id>1014540</project_id><text_data>Gary Reed's Excavating &amp; Trucking is a Rental Trucking Company.ACI - #22-017</text_data><comment_date>2022-07-26T00:00:00</comment_date></row><row _id="row-zzte_ij7w.sbmq" _uuid="00000000-0000-0000-2B85-6FD3D328E046" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zzte_ij7w.sbmq"><intent_id>1048227</intent_id><project_id>910609</project_id><text_data>Replace 13  cameras inside the Quincy Middle School.</text_data><comment_date>2020-03-27T00:00:00</comment_date></row><row _id="row-8rpf_k4ke_3nea" _uuid="00000000-0000-0000-DCF6-ACE450AE94E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8rpf_k4ke_3nea"><intent_id>544430</intent_id><project_id>699673</project_id><text_data>MMCI# 012436MidMountain Contractors, Inc the Prime will complete an Intent for all JOC Work Orders for vendors to link to with the ntent/Affidavit forms online. MidMountain will only complete one Affidavit under our Master Contract (Intent ID No. 333022)</text_data><comment_date>2012-11-14T00:00:00</comment_date></row><row _id="row-anf6.g8wn_8i4q" _uuid="00000000-0000-0000-6657-5E65EF5383A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-anf6.g8wn_8i4q"><intent_id>549463</intent_id><project_id>685462</project_id><text_data>Form filed by: Mat Cote</text_data><comment_date>2012-12-20T00:00:00</comment_date></row><row _id="row-tca2-94xt~esp2" _uuid="00000000-0000-0000-2341-43DC6D3FF5AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tca2-94xt~esp2"><intent_id>1271736</intent_id><project_id>1009553</project_id><text_data>CorrectedATS Job: 1122139UEE PO: 14725</text_data><comment_date>2022-10-04T00:00:00</comment_date></row><row _id="row-jznv~eyng_8x2h" _uuid="00000000-0000-0000-B6D5-29CB70297561" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jznv~eyng_8x2h"><intent_id>516360</intent_id><project_id>689196</project_id><text_data>Karl Meyers 2708 McKenzie Ave 98225</text_data><comment_date>2012-06-12T00:00:00</comment_date></row><row _id="row-4iws_j5br_ebrr" _uuid="00000000-0000-0000-18AA-A3A580192881" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4iws_j5br_ebrr"><intent_id>928682</intent_id><project_id>850985</project_id><text_data>1118118</text_data><comment_date>2018-08-27T00:00:00</comment_date></row><row _id="row-3sgd-82fd_x6d2" _uuid="00000000-0000-0000-FB06-513B943B2A09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3sgd-82fd_x6d2"><intent_id>1141582</intent_id><project_id>960696</project_id><text_data>COB Botanical Garden Mulch Trail Per Erik Sigurdson WO # 72273</text_data><comment_date>2021-05-04T00:00:00</comment_date></row><row _id="row-dyqz_k8dn~hgm8" _uuid="00000000-0000-0000-D1CB-FFA7DDE5B867" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dyqz_k8dn~hgm8"><intent_id>1177918</intent_id><project_id>979498</project_id><text_data>WO 236985 - AHU-4 WIRE REPLACEMENT</text_data><comment_date>2021-09-15T00:00:00</comment_date></row><row _id="row-4h4t-4nhr.9bzs" _uuid="00000000-0000-0000-4580-2BA32F9E4CC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4h4t-4nhr.9bzs"><intent_id>1131605</intent_id><project_id>953948</project_id><text_data>22917</text_data><comment_date>2021-03-25T00:00:00</comment_date></row><row _id="row-iwwk-eg9j_kxvc" _uuid="00000000-0000-0000-A507-B10B6636DD93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iwwk-eg9j_kxvc"><intent_id>634098</intent_id><project_id>736691</project_id><text_data>Inv #13089 - Rooftop Carrier Unit Repair - $778.77</text_data><comment_date>2014-06-10T00:00:00</comment_date></row><row _id="row-dm9s.n7pw-p78z" _uuid="00000000-0000-0000-ED73-AA6C36174D71" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dm9s.n7pw-p78z"><intent_id>1267598</intent_id><project_id>1031580</project_id><text_data>Replace Radiator Cap and Batteries on C27 Cat Generator for University of Washington, Molecular Engineering Bldg.</text_data><comment_date>2022-09-19T00:00:00</comment_date></row><row _id="row-ymbi.mcfm_sguw" _uuid="00000000-0000-0000-BA10-0D1D3287A2C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ymbi.mcfm_sguw"><intent_id>595126</intent_id><project_id>720487</project_id><text_data>Job # 172984</text_data><comment_date>2013-09-20T00:00:00</comment_date></row><row _id="row-8cjh~pfaw_2jiv" _uuid="00000000-0000-0000-0696-384EEA712B45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8cjh~pfaw_2jiv"><intent_id>1009147</intent_id><project_id>887556</project_id><comment_date>2019-09-23T00:00:00</comment_date></row><row _id="row-yyrw_8u82~st4w" _uuid="00000000-0000-0000-C5AA-AFB0B42C2C21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yyrw_8u82~st4w"><intent_id>655684</intent_id><project_id>744359</project_id><text_data>Install decomposed organic mulch, arborist wood chip mulch, planting soil, not to exceed 6&amp;quot; depth, seeded lawn installation, deciduous tree installation and ground cover installation</text_data><comment_date>2014-09-19T00:00:00</comment_date></row><row _id="row-gvkv_mma2~idej" _uuid="00000000-0000-0000-B66F-2FFA6BB2C2FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gvkv_mma2~idej"><intent_id>914252</intent_id><project_id>823829</project_id><text_data>1117072</text_data><comment_date>2018-06-27T00:00:00</comment_date></row><row _id="row-v6ub~hcyj-2jbr" _uuid="00000000-0000-0000-D3B2-9A92F42122CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v6ub~hcyj-2jbr"><intent_id>957548</intent_id><project_id>871917</project_id><text_data>Vertiv SID 81331, Quote Q02829427</text_data><comment_date>2019-01-29T00:00:00</comment_date></row><row _id="row-sp6r-z5qv.7k2j" _uuid="00000000-0000-0000-3792-B84B42D07115" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sp6r-z5qv.7k2j"><intent_id>1040485</intent_id><project_id>909578</project_id><text_data>19-W86</text_data><comment_date>2020-02-24T00:00:00</comment_date></row><row _id="row-j4z2_7tfe-7sq6" _uuid="00000000-0000-0000-0552-462BAD9C8A19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j4z2_7tfe-7sq6"><intent_id>512987</intent_id><project_id>688047</project_id><text_data>Filed by: Rex A. Gallaher</text_data><comment_date>2012-05-22T00:00:00</comment_date></row><row _id="row-mq5x_kbqq.uhs4" _uuid="00000000-0000-0000-D554-86C01D6042D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mq5x_kbqq.uhs4"><intent_id>1123227</intent_id><project_id>951062</project_id><text_data>1Hand dig a cleanout next to the house and clear Kitchen and laundry line2. Single Family3.1.54. a- no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no k-no, l-no5. yes6. yes7. no8. no</text_data><comment_date>2021-02-18T00:00:00</comment_date></row><row _id="row-y6sk~4hyi-3wtg" _uuid="00000000-0000-0000-34DA-1014DBB5D79F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y6sk~4hyi-3wtg"><intent_id>945085</intent_id><project_id>865804</project_id><text_data>Installation of topsoil, bark, plants. All labor will be done with hand tools. Any heavy equipment will be owner operator</text_data><comment_date>2018-11-09T00:00:00</comment_date></row><row _id="row-pfep.y7t3_p583" _uuid="00000000-0000-0000-5B8F-15FC76DF5890" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pfep.y7t3_p583"><intent_id>786333</intent_id><project_id>801300</project_id><text_data>1. installation of ductless mini split; 2. single 3. one 4a.no; 4b.no; 4c.yes; 4d.no 4e.no 4f.no 4g.no 4h.no 4i.no 4j.no 4k.no 5.no 6.no 7.no 8.no</text_data><comment_date>2016-08-31T00:00:00</comment_date></row><row _id="row-sty5.zyk8_cffb" _uuid="00000000-0000-0000-EE30-B2C8C819F404" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sty5.zyk8_cffb"><intent_id>897221</intent_id><project_id>846443</project_id><text_data>0818035</text_data><comment_date>2018-04-06T00:00:00</comment_date></row><row _id="row-8sqq.q3uy-5kuk" _uuid="00000000-0000-0000-2D38-A1F40DFEB442" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8sqq.q3uy-5kuk"><intent_id>911625</intent_id><project_id>853553</project_id><text_data>#1-We were contracted to replace the gas furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2018-06-15T00:00:00</comment_date></row><row _id="row-p84x-cfgn_ggnq" _uuid="00000000-0000-0000-4B28-5D47BF0510FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p84x-cfgn_ggnq"><intent_id>934462</intent_id><project_id>862062</project_id><text_data>Filed by Robert Fuller</text_data><comment_date>2018-09-20T00:00:00</comment_date></row><row _id="row-tma5-bidc.zskb" _uuid="00000000-0000-0000-E04E-4360477BD3E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tma5-bidc.zskb"><intent_id>1003506</intent_id><project_id>878570</project_id><text_data>provided wood chips for beautification of planter beds</text_data><comment_date>2019-10-10T00:00:00</comment_date></row><row _id="row-z7fe.39sv~aqsn" _uuid="00000000-0000-0000-8183-05308AF07B0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7fe.39sv~aqsn"><intent_id>850495</intent_id><project_id>823971</project_id><text_data>Filed by Andrew Harmon</text_data><comment_date>2017-07-26T00:00:00</comment_date></row><row _id="row-nt2u-xjxa_3y97" _uuid="00000000-0000-0000-A38F-8AC805A06895" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nt2u-xjxa_3y97"><intent_id>677367</intent_id><project_id>754876</project_id><text_data>1065C-39302 &amp; 1065C-39301</text_data><comment_date>2015-02-02T00:00:00</comment_date></row><row _id="row-jwd8_xnaf.gvxa" _uuid="00000000-0000-0000-D742-2797A36108E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jwd8_xnaf.gvxa"><intent_id>709609</intent_id><project_id>768186</project_id><text_data>Form filed by:  Rhonda Simpson</text_data><comment_date>2015-07-23T00:00:00</comment_date></row><row _id="row-dg7p~awd9-9zui" _uuid="00000000-0000-0000-87D3-6C44856840C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dg7p~awd9-9zui"><intent_id>913233</intent_id><project_id>852266</project_id><text_data>JOB#1065F-42707</text_data><comment_date>2018-06-22T00:00:00</comment_date></row><row _id="row-wmjt_5pis-vauu" _uuid="00000000-0000-0000-8DA2-378FC2E93B23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wmjt_5pis-vauu"><intent_id>821759</intent_id><project_id>816065</project_id><text_data>The project consisted of removing blackberry using weed eaters and loppers, the debris was put into dumpsters</text_data><comment_date>2017-03-30T00:00:00</comment_date></row><row _id="row-utau-a25p_bwfv" _uuid="00000000-0000-0000-F8B1-F4C6DE6DAB69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utau-a25p_bwfv"><intent_id>1242019</intent_id><project_id>1015507</project_id><text_data>Topsoil install 2' thick, seeding, sod, irrigation sleeving and repair	Misc hand tools as well as a bobcat skid steer</text_data><comment_date>2022-06-16T00:00:00</comment_date></row><row _id="row-xnmy.ux4a-t7yr" _uuid="00000000-0000-0000-77D7-F1C593816AE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xnmy.ux4a-t7yr"><intent_id>488447</intent_id><project_id>674909</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2011-11-09T00:00:00</comment_date></row><row _id="row-avsj.28yp-rwus" _uuid="00000000-0000-0000-3EA4-48C493444A86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-avsj.28yp-rwus"><intent_id>560616</intent_id><project_id>700250</project_id><text_data>Filed By Candis Brink</text_data><comment_date>2013-03-19T00:00:00</comment_date></row><row _id="row-x738-qkvn_6vfr" _uuid="00000000-0000-0000-48AD-7667FF1F0854" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x738-qkvn_6vfr"><intent_id>631999</intent_id><project_id>735899</project_id><text_data>Workers Keith Burrell and Mike Poe.  1.weatherization 2.sfd 3.1 4. a,b,no c yes d,e,f,g,h,i,j,k no. 5,6,7,8 no.</text_data><comment_date>2014-05-29T00:00:00</comment_date></row><row _id="row-3jhj~areu_k9ir" _uuid="00000000-0000-0000-758E-C8B5F4ECC551" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3jhj~areu_k9ir"><intent_id>638131</intent_id><project_id>734907</project_id><text_data>Water Truck: 10 Wheeler with a 3,500 gallon capacity</text_data><comment_date>2014-06-30T00:00:00</comment_date></row><row _id="row-crzt_9a2h~eje3" _uuid="00000000-0000-0000-706B-DFD38AACA50E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-crzt_9a2h~eje3"><intent_id>796141</intent_id><project_id>797805</project_id><text_data>KRCI LLC is filing on behalf of Don&amp;#39;s Painting LLC due to failure to file.No work performed</text_data><comment_date>2018-08-28T00:00:00</comment_date></row><row _id="row-bihx.s688.zhfq" _uuid="00000000-0000-0000-40F7-37460F9BF5CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bihx.s688.zhfq"><intent_id>1465698</intent_id><project_id>1106287</project_id><text_data>#23072 215 10th St Hoquiam (In front of Police Dept)</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-xwpy-9crq.rbfq" _uuid="00000000-0000-0000-896E-64E4EC77E3E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xwpy-9crq.rbfq"><intent_id>1469138</intent_id><project_id>1146344</project_id><text_data>PO# 837744</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-6gkt-kh36~gdqw" _uuid="00000000-0000-0000-D58F-33BDE89081F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6gkt-kh36~gdqw"><intent_id>666665</intent_id><project_id>745685</project_id><text_data>5 Maintenance Sites to Include Mowing and blowing of Grass area (Lawn Mower -push- Honda will be used as well as a Stihl Backpack Blower)4 Sites will have Sod Installation and we will use a hand compactor and hand install sod into specified locations.</text_data><comment_date>2014-11-20T00:00:00</comment_date></row><row _id="row-utrb~qcty~jifd" _uuid="00000000-0000-0000-B9FF-66D5E8C49BC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utrb~qcty~jifd"><intent_id>1258521</intent_id><project_id>1026769</project_id><text_data>Estimate 24111 $24552.30</text_data><comment_date>2022-08-16T00:00:00</comment_date></row><row _id="row-rqwy_8miv_udup" _uuid="00000000-0000-0000-9998-F1C7107F6DA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rqwy_8miv_udup"><intent_id>967088</intent_id><project_id>822014</project_id><text_data>ELCON HIRED US</text_data><comment_date>2019-03-22T00:00:00</comment_date></row><row _id="row-696i~ncap_cbk3" _uuid="00000000-0000-0000-F6C6-93CA4E19BDFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-696i~ncap_cbk3"><intent_id>1078668</intent_id><project_id>928342</project_id><text_data>Inside Electrician - Wage $47.85; District 9 $3.92; Edison Pension $8.20; NEBF $1.45; Health &amp; Welfare $10.05; Flex $1.30; Apprenticeship $.80; BLMCC $.20 (total fringe $25.92)?Electronic Technician (Limited Energy) - Wage $38.87; District 9 $1.65; Edison Pension $6.63; NEBF $1.17; Health &amp; Welfare $10.05; Flex $1.30; Apprenticeship $0.75; BLMCC $0.20 (total fringe $21.75)</text_data><comment_date>2020-08-07T00:00:00</comment_date></row><row _id="row-6uk5_de2k~qtsc" _uuid="00000000-0000-0000-F2F3-34F7F3EF3F91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6uk5_de2k~qtsc"><intent_id>1108170</intent_id><project_id>940018</project_id><text_data>VE 16674</text_data><comment_date>2020-12-08T00:00:00</comment_date></row><row _id="row-8ikw~x5y9_7nft" _uuid="00000000-0000-0000-20F9-E6F75434AFD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ikw~x5y9_7nft"><intent_id>736343</intent_id><project_id>771780</project_id><text_data>control panel assembly</text_data><comment_date>2015-12-07T00:00:00</comment_date></row><row _id="row-67px_zxdg~cbgw" _uuid="00000000-0000-0000-BA46-6C8FEC198CB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-67px_zxdg~cbgw"><intent_id>611860</intent_id><project_id>727281</project_id><text_data>Landscape maintenance on existing sites, mowing, weeding, blowing hard surfaces</text_data><comment_date>2014-01-17T00:00:00</comment_date></row><row _id="row-3gt7_trwk_84gd" _uuid="00000000-0000-0000-9DCD-945257FBDFD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gt7_trwk_84gd"><intent_id>818270</intent_id><project_id>802730</project_id><text_data>Signed by Sandra Trump</text_data><comment_date>2017-02-28T00:00:00</comment_date></row><row _id="row-rwb2_pea7_qmhj" _uuid="00000000-0000-0000-1EE7-10E97463EFEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rwb2_pea7_qmhj"><intent_id>957619</intent_id><project_id>863886</project_id><text_data>indicates this project is exempt from the payment of state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101.</text_data><comment_date>2019-02-01T00:00:00</comment_date></row><row _id="row-rsrw~3yiz_7xxb" _uuid="00000000-0000-0000-5D22-2919D0BEA06B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rsrw~3yiz_7xxb"><intent_id>613667</intent_id><project_id>728030</project_id><text_data>1. Insulating attic and floor with fiberglass blow and foam board insulation as requested by the Awarding Agency.2 Single family dwelling/ mobile home park3.moblile home, single story, 4a.no  b.no  c.yes  d.no  e.no f.no  g.no  h.no  i.no  j.no  k. no 5. yes6. yes/ managers office7. no</text_data><comment_date>2014-01-24T00:00:00</comment_date></row><row _id="row-2n5i_kaxn_gtwj" _uuid="00000000-0000-0000-DDE3-A44643C4B050" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2n5i_kaxn_gtwj"><intent_id>750805</intent_id><project_id>786959</project_id><text_data>JOB 901-19 PC6</text_data><comment_date>2016-03-10T00:00:00</comment_date></row><row _id="row-32am_qx5w-hwhe" _uuid="00000000-0000-0000-D95B-8F8FB10B979A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-32am_qx5w-hwhe"><intent_id>1139868</intent_id><project_id>959813</project_id><text_data>454190</text_data><comment_date>2021-04-27T00:00:00</comment_date></row><row _id="row-bz4t-c4hg_cp84" _uuid="00000000-0000-0000-ECC4-BEC3EB26065E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bz4t-c4hg_cp84"><intent_id>1259656</intent_id><project_id>1027371</project_id><text_data>6/23 found mold growth and small water leak behind cabinates in a lab.  Found more damage at the first of August that is related to previous loss.  Now will include possible removal of flooring, meeting City adjuster on site to walk through and solidify scope.5</text_data><comment_date>2022-08-19T00:00:00</comment_date></row><row _id="row-utte~dhpw.nfkv" _uuid="00000000-0000-0000-A571-059454856F3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utte~dhpw.nfkv"><intent_id>711578</intent_id><project_id>763556</project_id><text_data>Filed by Brian Tyler</text_data><comment_date>2015-08-03T00:00:00</comment_date></row><row _id="row-asa8_htgy-8u6s" _uuid="00000000-0000-0000-1D24-41F4BAFD683F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-asa8_htgy-8u6s"><intent_id>915181</intent_id><project_id>845209</project_id><text_data>Cleaning 2 locker rooms wipe walls clean showers scrubb floors with a floor machine  clean lockers and  toilets  use small ladder mop .</text_data><comment_date>2018-06-30T00:00:00</comment_date></row><row _id="row-g2h5-i287_g57h" _uuid="00000000-0000-0000-5F40-CD2152CD0549" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g2h5-i287_g57h"><intent_id>1228582</intent_id><project_id>1010275</project_id><text_data>#1 - construction of 4 identical duplexes, 8 living units#2 - duplex#3 - two story units#4 - (a) no, (b) no, (c) yes, (d) no, (e) no, (f) no, (g) no, (h) no, (i) no, (j) no, (k) no#5 - yes#6 - yes#7 - no#8 - no</text_data><comment_date>2022-04-26T00:00:00</comment_date></row><row _id="row-wzx8~jtqt.uk6r" _uuid="00000000-0000-0000-207D-6D4FB6F385DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wzx8~jtqt.uk6r"><intent_id>854355</intent_id><project_id>787849</project_id><text_data>Hauling of materials.</text_data><comment_date>2017-08-11T00:00:00</comment_date></row><row _id="row-cezh~t34y-zbc9" _uuid="00000000-0000-0000-A1D3-30D190A3158D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cezh~t34y-zbc9"><intent_id>492648</intent_id><project_id>678520</project_id><text_data>No</text_data><comment_date>2011-12-08T00:00:00</comment_date></row><row _id="row-wstg.krt8-nwmi" _uuid="00000000-0000-0000-64A1-1542402E0B6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wstg.krt8-nwmi"><intent_id>1017604</intent_id><project_id>897063</project_id><text_data>1. Weatherize home. 2. single family3. 1 or 24. a. nob. noc. yesd. noe. nof. nog. noI. noj. nok. yes6. yes7. no8. no</text_data><comment_date>2019-10-24T00:00:00</comment_date></row><row _id="row-q3wk-7ic5-b5g8" _uuid="00000000-0000-0000-0B66-AC0FF902A902" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q3wk-7ic5-b5g8"><intent_id>1182428</intent_id><project_id>981890</project_id><comment_date>2021-10-01T00:00:00</comment_date></row><row _id="row-g3zc.rr2g-v88m" _uuid="00000000-0000-0000-8DDC-7018C0B47975" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g3zc.rr2g-v88m"><intent_id>628277</intent_id><project_id>734399</project_id><text_data>Notes1# Installation of heating equipment2# Single family home has a kitchen bathroom and bedrooms3# single story home with a garage4# The building is the primary place of abode YesA) no The structure is not a place of businessB) NoC)YesD) NoE) NOF) NoG) NoH) NoI) NoJ) No#5 no#6 no#7 no#8 no</text_data><comment_date>2014-05-08T00:00:00</comment_date></row><row _id="row-9wvf-9zq2_bdmn" _uuid="00000000-0000-0000-E1E9-722C4EB010AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9wvf-9zq2_bdmn"><intent_id>1094127</intent_id><project_id>930850</project_id><text_data>Other Truck - Water Truck Other Truck - Lowboy Heavy Duty Trailer</text_data><comment_date>2020-10-07T00:00:00</comment_date></row><row _id="row-h7ft.ucf6.pabu" _uuid="00000000-0000-0000-66F8-F4C0086DF7ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h7ft.ucf6.pabu"><intent_id>681247</intent_id><project_id>756570</project_id><text_data>installing new urinals, replacing stub outs to urinals, installing shut off valves in ceiling above main restrooms and install shut off valve in wall between mens and womens restrooms by break room. Repair any broken tile the we may break.</text_data><comment_date>2015-03-02T00:00:00</comment_date></row><row _id="row-pjax~c7uu_9q8g" _uuid="00000000-0000-0000-AA90-260590040420" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjax~c7uu_9q8g"><intent_id>840185</intent_id><project_id>823238</project_id><text_data>1) Re-pipe water lines, install shower &amp; HWT. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f) No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) Yes - manager office. 8) No.</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-8kn3-w8rb~ixcb" _uuid="00000000-0000-0000-37FA-6482154139FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8kn3-w8rb~ixcb"><intent_id>748169</intent_id><project_id>785769</project_id><text_data>Found an L&amp;I Account ID number and entered in for Ind Ins #</text_data><comment_date>2016-03-25T00:00:00</comment_date></row><row _id="row-khxm~shrg_vzuv" _uuid="00000000-0000-0000-1FEB-4DB515BA9DFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-khxm~shrg_vzuv"><intent_id>1147715</intent_id><project_id>963976</project_id><text_data>This project was completed during the week of April 5th through 9th of 2021; a full month before the change in status regarding the contractors license. The project began on Monday April 5th, prep work etc. and was completed on Wednesday April 7th 2021. So, the date 05/18/2021 should be irrelevant to wrapping this thing up.</text_data><comment_date>2021-06-15T00:00:00</comment_date></row><row _id="row-u9c6.cmjz-5w6g" _uuid="00000000-0000-0000-9310-50073DC5B2F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u9c6.cmjz-5w6g"><intent_id>1239092</intent_id><project_id>1016411</project_id><text_data>9882526</text_data><comment_date>2022-06-06T00:00:00</comment_date></row><row _id="row-dsgu.jcth-qwgq" _uuid="00000000-0000-0000-2E53-34C3C921B738" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dsgu.jcth-qwgq"><intent_id>486421</intent_id><project_id>657305</project_id><text_data>SUB OUT ASSEMBLY AND INSTALL OF WATER STORAGE TANKS</text_data><comment_date>2011-10-28T00:00:00</comment_date></row><row _id="row-gh27.nrfi~z7ib" _uuid="00000000-0000-0000-71BD-F3AD936ACFD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gh27.nrfi~z7ib"><intent_id>499987</intent_id><project_id>682210</project_id><text_data>Fringe Breakdown:$17.60--$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $10.60 Pension$15.98--$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $8.98 Pension</text_data><comment_date>2012-02-10T00:00:00</comment_date></row><row _id="row-aiby_ekav~ceif" _uuid="00000000-0000-0000-ABEE-252B064A7191" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aiby_ekav~ceif"><intent_id>1196256</intent_id><project_id>988656</project_id><text_data>We are and Idaho based business for Industrial Insurance.</text_data><comment_date>2021-12-01T00:00:00</comment_date></row><row _id="row-t2r6~pj7n~42t7" _uuid="00000000-0000-0000-6EDA-A0689716E923" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t2r6~pj7n~42t7"><intent_id>752967</intent_id><project_id>787694</project_id><text_data>I don&amp;#39;t have a start date.I have been told that they wantto have the paper work done bye then.</text_data><comment_date>2016-03-23T00:00:00</comment_date></row><row _id="row-3bg4_b9c9~u385" _uuid="00000000-0000-0000-3E51-F48636B5EE5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bg4_b9c9~u385"><intent_id>502473</intent_id><project_id>683599</project_id><text_data>Form filed by: David Brockman</text_data><comment_date>2012-03-02T00:00:00</comment_date></row><row _id="row-xcfq.8ya3~acue" _uuid="00000000-0000-0000-16A3-1368D995CE9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xcfq.8ya3~acue"><intent_id>605904</intent_id><project_id>724494</project_id><text_data>Filed by Deborah J McCauley</text_data><comment_date>2013-11-27T00:00:00</comment_date></row><row _id="row-x3g7.qvk9.i2na" _uuid="00000000-0000-0000-95E8-B2CAB6C702EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3g7.qvk9.i2na"><intent_id>464441</intent_id><project_id>669527</project_id><text_data>We have soft ball field irrigation system to install and there will be some landscape restoration. Workers will use small tools to accomplish the work.</text_data><comment_date>2011-07-21T00:00:00</comment_date></row><row _id="row-a4t7-bszr-uynz" _uuid="00000000-0000-0000-17DA-73136B5BF4C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a4t7-bszr-uynz"><intent_id>994564</intent_id><project_id>888269</project_id><text_data>Motor Pat Grader to vacuum sewage for disposalHaz Waste worker to clear area of all debris using rake/shovel/broom</text_data><comment_date>2019-07-25T00:00:00</comment_date></row><row _id="row-4ctd~i7k9.75f2" _uuid="00000000-0000-0000-00EF-3B0887F0C885" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ctd~i7k9.75f2"><intent_id>1054005</intent_id><project_id>917017</project_id><text_data>SR#: 42585124</text_data><comment_date>2020-04-27T00:00:00</comment_date></row><row _id="row-bruy.agqu.6am2" _uuid="00000000-0000-0000-772A-A4DE5F6C99FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bruy.agqu.6am2"><intent_id>695374</intent_id><project_id>762632</project_id><text_data>Filed by Ronald F. Mitchell, Jr.Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with HUD Non-routine maintenance wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2015-05-19T00:00:00</comment_date></row><row _id="row-f53h_tk55.5mrk" _uuid="00000000-0000-0000-E4F1-6984B854BDCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f53h_tk55.5mrk"><intent_id>1264179</intent_id><project_id>1018437</project_id><text_data>PCI Scaffold 404 - Project # 22-10667</text_data><comment_date>2022-09-06T00:00:00</comment_date></row><row _id="row-jpf4-h4qf.qvec" _uuid="00000000-0000-0000-F7E9-C8836F65F744" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jpf4-h4qf.qvec"><intent_id>646900</intent_id><project_id>741456</project_id><text_data>Vista Heights is a manufactured home park, each home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The homes are no more than two stories in height. The homes are not open to the public and do not have businesses. The electricians will be replacing bathroom fans in each home, if there is extensive drywall damage, there will be drywallers repairing the ceiling. This job meets the residential job requirements.</text_data><comment_date>2014-08-11T00:00:00</comment_date></row><row _id="row-qpxb~8asf.j8bh" _uuid="00000000-0000-0000-3CC2-F64E0F9BE011" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qpxb~8asf.j8bh"><intent_id>637643</intent_id><project_id>733781</project_id><text_data>trucking services only. Project scope is to overlay and construct safety improvements on 9th st e.</text_data><comment_date>2014-06-26T00:00:00</comment_date></row><row _id="row-k5ib.k6gh~qxmt" _uuid="00000000-0000-0000-065B-3AB5EFA37888" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k5ib.k6gh~qxmt"><intent_id>492647</intent_id><project_id>671580</project_id><text_data>General Contractor is add and extension of building.  We are alternating the exisiting irrigations system</text_data><comment_date>2011-12-08T00:00:00</comment_date></row><row _id="row-6swq~ymfe~9sjr" _uuid="00000000-0000-0000-B452-BF4E286202B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6swq~ymfe~9sjr"><intent_id>1054650</intent_id><project_id>917372</project_id><text_data>Trucks: Other Trucks: Oil pumper</text_data><comment_date>2020-04-29T00:00:00</comment_date></row><row _id="row-gs5d_z56q-s7dh" _uuid="00000000-0000-0000-14C6-92C040093DFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gs5d_z56q-s7dh"><intent_id>977563</intent_id><project_id>859362</project_id><text_data>RON RHOADS IS AN OWNER/OPERATOR.ALL FRINGE BENEFITS ARE PAID IN FUL;L DIRECTLY TO THE EMPLOYEE.</text_data><comment_date>2019-05-13T00:00:00</comment_date></row><row _id="row-cqrq_burb_qrrh" _uuid="00000000-0000-0000-2C88-19413CD0DFF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqrq_burb_qrrh"><intent_id>840578</intent_id><project_id>795490</project_id><text_data>We are installing a horizontal lifeline system on the roof attaching the anchors using S5 clamps to a standing seam roof. This is the category we have used in the past for similar projects.</text_data><comment_date>2017-06-14T00:00:00</comment_date></row><row _id="row-k27t~xvew~qwaq" _uuid="00000000-0000-0000-82FB-CFCAE24D162A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k27t~xvew~qwaq"><intent_id>1268987</intent_id><project_id>1032327</project_id><text_data>All work will be done indoorsTelecommunication wi-fi Cabling</text_data><comment_date>2022-09-23T00:00:00</comment_date></row><row _id="row-uf6q.wciy-4fim" _uuid="00000000-0000-0000-C2A7-37C065598368" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uf6q.wciy-4fim"><intent_id>789211</intent_id><project_id>794401</project_id><text_data>TRUCK DRIVER-OTHER IS USED FOR TRUCK MOUNTED PICK UP SWEEPER</text_data><comment_date>2016-09-14T00:00:00</comment_date></row><row _id="row-9wxv-zkvt.56h5" _uuid="00000000-0000-0000-BEE7-92BA3FF79B54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9wxv-zkvt.56h5"><intent_id>676630</intent_id><project_id>751647</project_id><text_data>Form filed by: Jason Stern</text_data><comment_date>2015-01-27T00:00:00</comment_date></row><row _id="row-ccv2~y8vc-9uxw" _uuid="00000000-0000-0000-167C-8CE9711E1CC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ccv2~y8vc-9uxw"><intent_id>681052</intent_id><project_id>756490</project_id><text_data>Owner of Drain Tech, Inc Did the following work at Foster High schoolKitchen - Pre Rinse/ Garbage Disposal blocked line.Cabled line to clear blockage and tested for flow</text_data><comment_date>2015-02-26T00:00:00</comment_date></row><row _id="row-vhrz~inxz_2p39" _uuid="00000000-0000-0000-1455-50E531B9BDE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vhrz~inxz_2p39"><intent_id>565854</intent_id><project_id>709397</project_id><text_data>Filed by: Chris Davies</text_data><comment_date>2013-04-22T00:00:00</comment_date></row><row _id="row-hcvt-bdnc_i477" _uuid="00000000-0000-0000-099E-00EB50F67309" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hcvt-bdnc_i477"><intent_id>871964</intent_id><project_id>836258</project_id><text_data>In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions in the notes section at the bottom of this screen: #1 - Describe the work that your firm was contracted to perform. GUTTERS AND DOWNSPUTS #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? SINGLE FAMILY#3 - Including any basement or garage, how many stories or levels does the structure have? ONE STORY #4 - What is the building used for? SINGLE FAMILY RESIDENCE--Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO (e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services?NO (h) Assisted living services? NO(I) Dormitories? (NOj) Counseling? NO(k) Is each room and/or bed in the structure rented separately? (NOl) Other? #5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2017-10-30T00:00:00</comment_date></row><row _id="row-f76r~mgh5-u7bf" _uuid="00000000-0000-0000-A8AC-22D984593934" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f76r~mgh5-u7bf"><intent_id>789752</intent_id><project_id>795286</project_id><text_data>Trucks with Belly-dump Trailers</text_data><comment_date>2016-09-15T00:00:00</comment_date></row><row _id="row-mrek.fkqc-f7yn" _uuid="00000000-0000-0000-8AA7-0615B8C80D56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrek.fkqc-f7yn"><intent_id>1172723</intent_id><project_id>976840</project_id><text_data>301FCJ063C - 3RD YEAR FA CSP</text_data><comment_date>2021-08-26T00:00:00</comment_date></row><row _id="row-7ytw_pbde_yp7y" _uuid="00000000-0000-0000-A7CC-EC97CFBF964D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ytw_pbde_yp7y"><intent_id>1094335</intent_id><project_id>917027</project_id><text_data>Interwest Construction</text_data><comment_date>2020-10-08T00:00:00</comment_date></row><row _id="row-tsw2-5a77.4rep" _uuid="00000000-0000-0000-7692-7F7EC989B6DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsw2-5a77.4rep"><intent_id>1045838</intent_id><project_id>912698</project_id><text_data>SR#: 46686888</text_data><comment_date>2020-03-17T00:00:00</comment_date></row><row _id="row-bsy7_rwss_nw8p" _uuid="00000000-0000-0000-9400-34906C6395B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bsy7_rwss_nw8p"><intent_id>798492</intent_id><project_id>805947</project_id><text_data>We will be using hand tools to dig along the inside of the bamboo root barriers to remove any congested roots.  We will haul away the debris and fill the holes with new soil.</text_data><comment_date>2016-10-27T00:00:00</comment_date></row><row _id="row-z39i~ghrt~ppy7" _uuid="00000000-0000-0000-30D1-BDD7AC8BDF8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z39i~ghrt~ppy7"><intent_id>557844</intent_id><project_id>705756</project_id><text_data>Fringe $0.75  HL .44 VC .31Fringe $4.83 Pen .30 Med 2.83 HL .57 VC BD .07 sick .21Fringe $4.51 PEn .30 Med 2.83 HL .44 VC .88 float HL .06</text_data><comment_date>2013-02-26T00:00:00</comment_date></row><row _id="row-m2xm~bfxp-5jxh" _uuid="00000000-0000-0000-0300-690FAA9EF02E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2xm~bfxp-5jxh"><intent_id>537196</intent_id><project_id>696905</project_id><text_data>We will be using pick axes, shovels, saws, loppers, wheelbarrows and tarps to remove the 4&amp;quot; of soil and bamboo roots inside the bamboo root barrier.  We will then fill the holes with new soil.</text_data><comment_date>2017-11-15T00:00:00</comment_date></row><row _id="row-dxsv~hdmv_w4hm" _uuid="00000000-0000-0000-8F86-407BF7BC4B94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dxsv~hdmv_w4hm"><intent_id>573678</intent_id><project_id>712652</project_id><text_data>all work subcontracted out</text_data><comment_date>2013-06-06T00:00:00</comment_date></row><row _id="row-bhw5~i5dn_jikc" _uuid="00000000-0000-0000-B80D-A2E71EAAB125" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bhw5~i5dn_jikc"><intent_id>654179</intent_id><project_id>744246</project_id><text_data>Per Abby Madsen:The note should read as follows:Medical and Dental Insurance $2.53 and Davis Bacon Pension Fund $4.48.</text_data><comment_date>2014-09-15T00:00:00</comment_date></row><row _id="row-fci3.ngiw_g4bt" _uuid="00000000-0000-0000-B13D-25B5ED72F23F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fci3.ngiw_g4bt"><intent_id>937637</intent_id><project_id>863223</project_id><text_data>1)Install ductless heat pump system 2)single family dwelling 3)one story 4)residence a)no b)no c)yes d)no e)no f)no g)no h)no I)no j)no 5)yes 6 )yes 7)no 8)no</text_data><comment_date>2018-10-04T00:00:00</comment_date></row><row _id="row-sekn.xan3_j3uc" _uuid="00000000-0000-0000-039F-BEDE845BF593" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sekn.xan3_j3uc"><intent_id>1253776</intent_id><project_id>1024343</project_id><text_data>9877885</text_data><comment_date>2022-07-31T00:00:00</comment_date></row><row _id="row-8fvc_h98m.enbk" _uuid="00000000-0000-0000-C47D-8A71B50D6C10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8fvc_h98m.enbk"><intent_id>969451</intent_id><project_id>877517</project_id><text_data>1190045</text_data><comment_date>2019-04-04T00:00:00</comment_date></row><row _id="row-q8ad~etc5-fs4x" _uuid="00000000-0000-0000-F380-C2B9F923349F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8ad~etc5-fs4x"><intent_id>1104050</intent_id><project_id>938706</project_id><text_data>Install ductless heat pump systemSingle Family Dwelling1Primary Residence   a. no   b. no  c. yes   d. no  e. no  f. no g. no h. no  i. no  j. no  k. no  l.  noyesyesnono</text_data><comment_date>2020-11-17T00:00:00</comment_date></row><row _id="row-hben.6ajd~wpzg" _uuid="00000000-0000-0000-2A37-E008A7A35A65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hben.6ajd~wpzg"><intent_id>944528</intent_id><project_id>861129</project_id><text_data>Tymco 600 on international or freightliner chassis</text_data><comment_date>2018-11-07T00:00:00</comment_date></row><row _id="row-43ua.wt43-padm" _uuid="00000000-0000-0000-E080-F2FABE51BB44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-43ua.wt43-padm"><intent_id>818345</intent_id><project_id>810825</project_id><text_data>New Contract number 009050</text_data><comment_date>2017-03-13T00:00:00</comment_date></row><row _id="row-phve~kdfr~79ts" _uuid="00000000-0000-0000-C004-1A08EA357A6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-phve~kdfr~79ts"><intent_id>888200</intent_id><project_id>812396</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2018-02-13T00:00:00</comment_date></row><row _id="row-cais.p27d-kh85" _uuid="00000000-0000-0000-1A88-ABFB8D69AC9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cais.p27d-kh85"><intent_id>947293</intent_id><project_id>867152</project_id><text_data>On 8/16/2018:--CAP is covered by State Industrial Insurance through the State of Idaho.-- On 8/16/2018:--1) Weatherization of low-income residences; 2) All structures we weatherize are residential (whether simplex, duplex, triplex, apartments, or other low-income residential dwellings; 3) Dwellings we weatherize in Asotin County vary between 1 level and up to 3 levels; 4) a) No b) No c) Yes d) No e) No f) No g) No h) No i) No j) No k) N/A; 5) Yes; 6) Yes; 7) No; 8) No</text_data><comment_date>2018-11-26T00:00:00</comment_date></row><row _id="row-38g2.afwt~tduw" _uuid="00000000-0000-0000-B093-5AF86B26DFA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-38g2.afwt~tduw"><intent_id>1035678</intent_id><project_id>906845</project_id><text_data>#1 Replace bathroom fan/light combo�s units A B C D E F Install bathroom wall heaters Units A B C D E F. #2 Duplex dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j)No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public</text_data><comment_date>2020-02-03T00:00:00</comment_date></row><row _id="row-4mng~huwg-bkh6" _uuid="00000000-0000-0000-F883-0173955CDB8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4mng~huwg-bkh6"><intent_id>624037</intent_id><project_id>732662</project_id><text_data>0504-098-00</text_data><comment_date>2014-04-09T00:00:00</comment_date></row><row _id="row-qhzj.8rjc-c77p" _uuid="00000000-0000-0000-7C3A-8B062DF0113B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qhzj.8rjc-c77p"><intent_id>1272139</intent_id><project_id>1032620</project_id><text_data>Oregon Employees Only - SAIF 811528</text_data><comment_date>2022-10-05T00:00:00</comment_date></row><row _id="row-sg82_mjr3_c2cs" _uuid="00000000-0000-0000-6A66-995D308B127C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sg82_mjr3_c2cs"><intent_id>894042</intent_id><project_id>846368</project_id><text_data>302715</text_data><comment_date>2018-03-21T00:00:00</comment_date></row><row _id="row-vv32.va9b_anwh" _uuid="00000000-0000-0000-3F99-B23CA1CDED9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vv32.va9b_anwh"><intent_id>678501</intent_id><project_id>755392</project_id><text_data>Goldberry Ln, Camano Island1. Air seal, attic blow, duct seal, belly blow		2. Single family		3. 1		4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No		5. Yes		6. Yes		7. No		8. No</text_data><comment_date>2015-02-09T00:00:00</comment_date></row><row _id="row-qfij-nh4n-jtax" _uuid="00000000-0000-0000-18FA-F05C7127E474" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qfij-nh4n-jtax"><intent_id>1007990</intent_id><project_id>893600</project_id><text_data>We will be installing compost or bark mulch as a topdressing to finish off the landscaped beds and our work falls under the landscape Maintenance category. Our laborers are responsible for backpack blower cleanup and will be paid according to the rates published for landscaping and planting laborer. The operator of the blower truck will be paid according to the oil distribution / mulch distribution power equipment operator category. Please approve this intent as filed. Thank you for your assistance.</text_data><comment_date>2019-10-08T00:00:00</comment_date></row><row _id="row-9ce2-vbn4_vh3d" _uuid="00000000-0000-0000-7900-B96400B0E86A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ce2-vbn4_vh3d"><intent_id>518018</intent_id><project_id>689410</project_id><text_data>DIGGING DITCHES</text_data><comment_date>2012-06-25T00:00:00</comment_date></row><row _id="row-f7uz~grzc-6r3r" _uuid="00000000-0000-0000-D616-8C79C8BD4EB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f7uz~grzc-6r3r"><intent_id>1014561</intent_id><project_id>893492</project_id><text_data>1.    Construction of apartment building and duplexes.  2.    Yes 3.    Three story apartment. Two story duplex units. 4.    Multi Family Housing. Item C. 5.    Yes 6.    Yes 7.    Yes 8.    No</text_data><comment_date>2019-10-10T00:00:00</comment_date></row><row _id="row-3b2t~q6ji-mwuj" _uuid="00000000-0000-0000-13FB-63C6DB4AFB5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3b2t~q6ji-mwuj"><intent_id>858392</intent_id><project_id>824335</project_id><text_data>Filed by Robert Spanjer</text_data><comment_date>2017-08-24T00:00:00</comment_date></row><row _id="row-k5ka-iq6e.wvgg" _uuid="00000000-0000-0000-C391-14C76837102E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k5ka-iq6e.wvgg"><intent_id>975110</intent_id><project_id>879984</project_id><text_data>Contractors license is not required for cleaning and inspection services by divers.Workers Compensation Fund of Utah acct#2033000 is a reciprocating state with WA</text_data><comment_date>2019-05-01T00:00:00</comment_date></row><row _id="row-fe4z~xnqa.hfuj" _uuid="00000000-0000-0000-11FF-8421006DEF35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fe4z~xnqa.hfuj"><intent_id>575472</intent_id><project_id>709313</project_id><text_data>Per request from LNI 6/19/13, The hiring Contractor's Name is: Halme Construction, Inc. Reg #HALMECI061R7, UBI #600 54 2278.  Thank you, Monica</text_data><comment_date>2013-07-11T00:00:00</comment_date></row><row _id="row-cbgi_dgg3.xxcg" _uuid="00000000-0000-0000-9588-D3A2AD22A560" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cbgi_dgg3.xxcg"><intent_id>1218471</intent_id><project_id>1004036</project_id><text_data>Service repair on furnace for homeowner in a single family 1 story home - 4a) NO 4b) NO 4c) YES 4d) NO 4e) NO 4f) NO 4g) NO 4h) NO 4i) NO 4j) NO 4k) NO 5) NO 6) NO 7) NO 8) NO</text_data><comment_date>2022-03-16T00:00:00</comment_date></row><row _id="row-4drm-gfvc~dmvy" _uuid="00000000-0000-0000-AD56-8B66E83A27AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4drm-gfvc~dmvy"><intent_id>764348</intent_id><project_id>792904</project_id><text_data>Control of weeds. Hand weeding. Herbicide application using backpack sprayers. No power equipment.</text_data><comment_date>2016-05-25T00:00:00</comment_date></row><row _id="row-vrp6.k3y4-ixbj" _uuid="00000000-0000-0000-ECC0-A2E5052A6D49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vrp6.k3y4-ixbj"><intent_id>1263983</intent_id><project_id>1029563</project_id><text_data>122962-001</text_data><comment_date>2022-09-04T00:00:00</comment_date></row><row _id="row-7xc2~pqyp~5qsn" _uuid="00000000-0000-0000-8CEB-123818666DC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7xc2~pqyp~5qsn"><intent_id>535990</intent_id><project_id>692469</project_id><text_data>Project is exempt from state prevailing wage requirements based on the housing act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupation.</text_data><comment_date>2012-09-22T00:00:00</comment_date></row><row _id="row-p9jd~fq85.37za" _uuid="00000000-0000-0000-B24C-130884B4290C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p9jd~fq85.37za"><intent_id>838043</intent_id><project_id>818363</project_id><text_data>Tymco 600 sweeper on International or Freighliner chassis</text_data><comment_date>2017-06-04T00:00:00</comment_date></row><row _id="row-4zd4_vvgz-makf" _uuid="00000000-0000-0000-C09A-4A2914D9CDEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4zd4_vvgz-makf"><intent_id>1005168</intent_id><project_id>850409</project_id><text_data>WRI WO # 44144/ 19.950</text_data><comment_date>2019-09-06T00:00:00</comment_date></row><row _id="row-7cy5.4bs5~n5xk" _uuid="00000000-0000-0000-2F24-AB8FDCDB86E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7cy5.4bs5~n5xk"><intent_id>1038152</intent_id><project_id>889005</project_id><text_data>1519226</text_data><comment_date>2020-02-13T00:00:00</comment_date></row><row _id="row-35hn-5qip.vrjd" _uuid="00000000-0000-0000-BA1C-9AE47F49500D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-35hn-5qip.vrjd"><intent_id>809811</intent_id><project_id>810581</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2017-01-06T00:00:00</comment_date></row><row _id="row-ys5r~pz46~vh2k" _uuid="00000000-0000-0000-83F7-FDE692091A7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ys5r~pz46~vh2k"><intent_id>960792</intent_id><project_id>873487</project_id><text_data>301SNJ0089</text_data><comment_date>2019-02-19T00:00:00</comment_date></row><row _id="row-2aru.2rqi.hwgp" _uuid="00000000-0000-0000-FAE2-A729076D18C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2aru.2rqi.hwgp"><intent_id>1126076</intent_id><project_id>950240</project_id><text_data>***SELF-INSURED**.GENERAL LABORER: Performs work of shoveling with a hand shovel, cleaning/sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket and hand broom.OTHER TRUCKS: A Low Boy trailer used for delivery and pick up of equipment. A 2018 Kenworth Tack Truck 2,000 gallon</text_data><comment_date>2021-03-03T00:00:00</comment_date></row><row _id="row-i6jx-khy4.35hz" _uuid="00000000-0000-0000-0A23-C9EF528BBBA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i6jx-khy4.35hz"><intent_id>1154546</intent_id><project_id>967674</project_id><text_data>COMPLETE REPAIRS FOUND IN THE UW SEMI FIBER OPTIC ROUTE INSPECTION. BROKEN LASHING WIRE IN NE BALLINGHER WAY, CABLE NEEDS ATTACHED AT POLE IN EDMONDS</text_data><comment_date>2021-06-22T00:00:00</comment_date></row><row _id="row-5hwf_4799~zxsw" _uuid="00000000-0000-0000-530E-98A88C42AD88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5hwf_4799~zxsw"><intent_id>550974</intent_id><project_id>702611</project_id><text_data>Fringe $15.84 (Pension $7.48 , Medical $7.39 , Other $0.97)</text_data><comment_date>2013-01-08T00:00:00</comment_date></row><row _id="row-62nq.jufi.vf6r" _uuid="00000000-0000-0000-195F-05A02276A339" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-62nq.jufi.vf6r"><intent_id>495002</intent_id><project_id>680574</project_id><text_data>910 Mason Street, Bellingham2109 B Street, Bellingham</text_data><comment_date>2011-12-28T00:00:00</comment_date></row><row _id="row-dine-gzhz-gag4" _uuid="00000000-0000-0000-26A4-DB960F5CBE8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dine-gzhz-gag4"><intent_id>1168798</intent_id><project_id>974930</project_id><text_data>Furnish and install the energy efficiency measures, including any and all necessary ancillary equipment, as described in the Seattle Central College Energy Services Proposal dated July 15, 2021. This will include electrical work within the numerous rooms of the building replacing light ballasts, switches, and other lighting control mechanisms.</text_data><comment_date>2021-08-25T00:00:00</comment_date></row><row _id="row-prfk-djvn-s37c" _uuid="00000000-0000-0000-82D5-2174EBD2E50D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prfk-djvn-s37c"><intent_id>1139898</intent_id><project_id>959110</project_id><text_data>Other Truck is a 4000 gallon water truck.</text_data><comment_date>2021-04-27T00:00:00</comment_date></row><row _id="row-4mtu_saue~itha" _uuid="00000000-0000-0000-5FBE-ED798978A6C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4mtu_saue~itha"><intent_id>1243383</intent_id><project_id>1012519</project_id><text_data>Public note added per customer request: Per Contractor Registration, RST no longer needs a contractor's license number for excavation because they are only on a dump truck rental basis from now on.</text_data><comment_date>2022-11-22T00:00:00</comment_date></row><row _id="row-nkxf_zbd9.9s95" _uuid="00000000-0000-0000-6531-4E0B1B584B4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nkxf_zbd9.9s95"><intent_id>962384</intent_id><project_id>874223</project_id><text_data>Work consists of mowing, edging, trimming, blowing, planted bed maintenance, herbicide application, pruning/shaping shrubs and ground cover.   Tools used are mowers, trimmers, blowers, edgers, hedge trimmers, hand tools i.e. rakes, shovels, pruners, loppers.</text_data><comment_date>2019-05-14T00:00:00</comment_date></row><row _id="row-ch26_fw4z~p8mf" _uuid="00000000-0000-0000-5464-D52E43095F74" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ch26_fw4z~p8mf"><intent_id>1276127</intent_id><project_id>1036152</project_id><text_data>1.Weatherization 2. single family 3. 1 4. Aa0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2022-10-19T00:00:00</comment_date></row><row _id="row-9frr.nzwm.hi2p" _uuid="00000000-0000-0000-9620-719777CEE511" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9frr.nzwm.hi2p"><intent_id>1135491</intent_id><project_id>957995</project_id><text_data>9864269</text_data><comment_date>2021-04-13T00:00:00</comment_date></row><row _id="row-pf8n-ebcc_63kg" _uuid="00000000-0000-0000-EF05-48400D1FDABA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pf8n-ebcc_63kg"><intent_id>733269</intent_id><project_id>777665</project_id><text_data>took trees off school and chipped brush</text_data><comment_date>2015-11-30T00:00:00</comment_date></row><row _id="row-bznd-vnnm-s3rn" _uuid="00000000-0000-0000-3A67-85BFF5143F9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bznd-vnnm-s3rn"><intent_id>1086131</intent_id><project_id>925662</project_id><text_data>Worked performed is for UHF, VHF, Broadcast, Point to Point and multi-channel voice operation that will pass through 7/8' coaxial transmission line cable. Telecommunication Technicians will install all transmission cables and antennas.</text_data><comment_date>2020-09-14T00:00:00</comment_date></row><row _id="row-i4zv-k73t-4469" _uuid="00000000-0000-0000-6AE1-9760DEE7CBCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i4zv-k73t-4469"><intent_id>919015</intent_id><project_id>856238</project_id><text_data>Installation of Cat6 cabling for (11) security camera locations. Indoor</text_data><comment_date>2018-07-18T00:00:00</comment_date></row><row _id="row-6ypd_arw7.rhaq" _uuid="00000000-0000-0000-EF81-89CCD0483FED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ypd_arw7.rhaq"><intent_id>931801</intent_id><project_id>861053</project_id><text_data>After reviewing your notes we have a better understanding the classification change.  Thank you so much.</text_data><comment_date>2018-09-18T00:00:00</comment_date></row><row _id="row-4iz6.xhm5.tj6f" _uuid="00000000-0000-0000-D2DA-30E3C6033FDA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4iz6.xhm5.tj6f"><intent_id>645878</intent_id><project_id>741055</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-08-07T00:00:00</comment_date></row><row _id="row-87t8-crsi-g34n" _uuid="00000000-0000-0000-CAD2-5343ABEE89EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87t8-crsi-g34n"><intent_id>760022</intent_id><project_id>791087</project_id><text_data>Type of work is herbicide spraying only using a backpack sprayer</text_data><comment_date>2016-05-03T00:00:00</comment_date></row><row _id="row-zznn.44tq_hm87" _uuid="00000000-0000-0000-DFBA-072F39B37FF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zznn.44tq_hm87"><intent_id>575812</intent_id><project_id>713484</project_id><text_data>Contract is to plant seven Autumn Blaze Maples in pre-dug holes in sidewalk along one block of Water Street in Port Townsend</text_data><comment_date>2013-06-18T00:00:00</comment_date></row><row _id="row-qc6n~yb6j~gmmg" _uuid="00000000-0000-0000-B138-F557D1AB5E17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qc6n~yb6j~gmmg"><intent_id>1118211</intent_id><project_id>947769</project_id><text_data>Stoneway Concrete is a Supplier</text_data><comment_date>2021-01-27T00:00:00</comment_date></row><row _id="row-49re_84wy_768e" _uuid="00000000-0000-0000-C549-CA7DC153D96C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49re_84wy_768e"><intent_id>686695</intent_id><project_id>758919</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2015-04-02T00:00:00</comment_date></row><row _id="row-jeji_w4fy~nd7u" _uuid="00000000-0000-0000-167F-625DCE220EC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jeji_w4fy~nd7u"><intent_id>817492</intent_id><project_id>814135</project_id><text_data>Clean fuel/oil spill from storm water pipeHaz Waste worker to clear area of all spilled liquids using sorbent pads, shovel, rake</text_data><comment_date>2017-02-23T00:00:00</comment_date></row><row _id="row-qmsj~ccyn~gr47" _uuid="00000000-0000-0000-7183-9F664E613455" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qmsj~ccyn~gr47"><intent_id>1458465</intent_id><project_id>1140820</project_id><text_data>'Other Truck' is our LowBoy for moving equipment</text_data><comment_date>2024-08-20T00:00:00</comment_date></row><row _id="row-pbxm~aypm.2p2f" _uuid="00000000-0000-0000-6FCE-12F45CBF955A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbxm~aypm.2p2f"><intent_id>506833</intent_id><project_id>685525</project_id><text_data>The landfill has gravel access and perimeter roads.  The roads require on-going periodic maintenance for minor potholes that typically develop over the winter months.  Gravel is stockpiled on the site.  Company employee(s) utilize hand tools (shovels) to load the gravel into the bed of a company owned pickup truck.  The employee(s) then drive the roads and identify problem areas.  Employee(s) utilize hand tools (shovels and rakes) to fill potholes with the gravel.  Clark County is the primary project manager for the site.  The County goes out for bids or quotes for road maintenance that exceeds the activities described above.  Prevailing wage requirements are included in agreements with selected vendors in accordance with RCW 39.12</text_data><comment_date>2012-05-15T00:00:00</comment_date></row><row _id="row-z4kz.jp4e~gwfk" _uuid="00000000-0000-0000-1F23-846E1847D965" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z4kz.jp4e~gwfk"><intent_id>563179</intent_id><project_id>582887</project_id><text_data>Form filed by: Rose Waterman</text_data><comment_date>2013-04-04T00:00:00</comment_date></row><row _id="row-vxhi.q4gs-6326" _uuid="00000000-0000-0000-C8EE-C95340F53BB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vxhi.q4gs-6326"><intent_id>795375</intent_id><project_id>795737</project_id><text_data>Power Equipment Operators-Motor Patrol Graders:  This is trade/occupation is being applied to a vacuum truck operator.</text_data><comment_date>2016-10-12T00:00:00</comment_date></row><row _id="row-6j7n-f349~6cxs" _uuid="00000000-0000-0000-14B7-EB97926F4690" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6j7n-f349~6cxs"><intent_id>1419059</intent_id><project_id>1120099</project_id><text_data>9940421</text_data><comment_date>2024-04-14T00:00:00</comment_date></row><row _id="row-fayj-hia8.8c47" _uuid="00000000-0000-0000-10DF-00DC007BD133" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fayj-hia8.8c47"><intent_id>899507</intent_id><project_id>847055</project_id><text_data>110 Sagetrail Road #49Yakima, WA 98901</text_data><comment_date>2018-04-19T00:00:00</comment_date></row><row _id="row-n7wu_4m7y_zeue" _uuid="00000000-0000-0000-3F71-97C7AF919620" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n7wu_4m7y_zeue"><intent_id>1107735</intent_id><project_id>933134</project_id><text_data>$66.83/hr 7E 4X 8N 0603</text_data><comment_date>2020-12-04T00:00:00</comment_date></row><row _id="row-5jxk.rcqd-9nsz" _uuid="00000000-0000-0000-B985-8621BCD11F9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5jxk.rcqd-9nsz"><intent_id>924142</intent_id><project_id>818193</project_id><text_data>Other truck - Water Truck Other truck - Lowboy/lowbed heavy duty trailer</text_data><comment_date>2018-08-08T00:00:00</comment_date></row><row _id="row-bkng~eygk~k59v" _uuid="00000000-0000-0000-A23F-DCB5220CF20F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bkng~eygk~k59v"><intent_id>1048064</intent_id><project_id>913235</project_id><text_data>our work is to install automatic irrigation and drainage to an elementary school playfield</text_data><comment_date>2020-03-27T00:00:00</comment_date></row><row _id="row-5s8t.7itv-25yt" _uuid="00000000-0000-0000-68BA-C467607E2C23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5s8t.7itv-25yt"><intent_id>553277</intent_id><project_id>703583</project_id><text_data>This job was putting Christmas lights in trees along yakima Ave. All work will be done from the ground. no equipment needed.</text_data><comment_date>2013-01-24T00:00:00</comment_date></row><row _id="row-wt9c~5avz_dv6n" _uuid="00000000-0000-0000-5D9E-513AA3E8F6A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wt9c~5avz_dv6n"><intent_id>769534</intent_id><project_id>794173</project_id><text_data>The Landscaping is for a school remodel project. We will modify the irrigation system to run during construction; and install sod. Using hand tools such as shovels, rakes, pipe cutters &amp; etc. Equipment was under the 90 HP � mini excavator to trench.</text_data><comment_date>2016-06-20T00:00:00</comment_date></row><row _id="row-745r.b5wh.6zuj" _uuid="00000000-0000-0000-161A-CE22D68F1558" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-745r.b5wh.6zuj"><intent_id>825260</intent_id><project_id>817584</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2017-04-07T00:00:00</comment_date></row><row _id="row-qheq_idza-eia7" _uuid="00000000-0000-0000-118D-E37FE6BE2670" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qheq_idza-eia7"><intent_id>1188693</intent_id><project_id>972274</project_id><text_data>other trucks - low boys to haul equipmentspoke with liz at L&amp;I - we are a self insured company and are in good standings</text_data><comment_date>2021-10-27T00:00:00</comment_date></row><row _id="row-j7q8.qz6h.cvr6" _uuid="00000000-0000-0000-A94A-56EB4C55ADBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j7q8.qz6h.cvr6"><intent_id>894245</intent_id><project_id>846444</project_id><text_data>We do not have any employees that are residents of WA State.  Workers Comp Carrier- Saif Corporation #947202</text_data><comment_date>2018-03-22T00:00:00</comment_date></row><row _id="row-iqxi.t5js-6f2a" _uuid="00000000-0000-0000-D763-85D6E933D4F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iqxi.t5js-6f2a"><intent_id>776970</intent_id><project_id>796497</project_id><text_data>Filed by Jo Ann Ferguson</text_data><comment_date>2016-07-22T00:00:00</comment_date></row><row _id="row-aj95-c9hi-ke6j" _uuid="00000000-0000-0000-BB74-C88EC8DF9283" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aj95-c9hi-ke6j"><intent_id>1270247</intent_id><project_id>1027336</project_id><text_data>We have workers comp in Oregon with SAIF</text_data><comment_date>2022-09-28T00:00:00</comment_date></row><row _id="row-npb7-hdme.rrf4" _uuid="00000000-0000-0000-15D5-528C1786322F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-npb7-hdme.rrf4"><intent_id>591535</intent_id><project_id>709011</project_id><text_data>From: Dan Clabots [mailto:djclabots@gmail.com] Sent: Monday, September 09, 2013 4:32 PMTo: Navarrete, Briana (LNI)Subject: Skagit Start DateBrianna, The expected start date for painting at the Skagit MOB is 10/15/2013.  Thank you for your patience.   Dan Clabots.</text_data><comment_date>2013-09-10T00:00:00</comment_date></row><row _id="row-dpwn~8gdk~85re" _uuid="00000000-0000-0000-56CF-9010FCDF5CE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpwn~8gdk~85re"><intent_id>484670</intent_id><project_id>668290</project_id><text_data>The scope of work for this project was to provide and install voice and data network infrastructure cabling.</text_data><comment_date>2011-10-19T00:00:00</comment_date></row><row _id="row-5x6p.xpna~fujr" _uuid="00000000-0000-0000-24F0-3FC25098D587" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5x6p.xpna~fujr"><intent_id>530904</intent_id><project_id>694678</project_id><text_data>Item breakdown of the $15.90 hourly total fringe benefit package =Health &amp; Sec 7.55Pension 7.65Apprenticsehip / Training 0.70</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-8wvk-a2sx_juuy" _uuid="00000000-0000-0000-4127-BAE910A27967" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8wvk-a2sx_juuy"><intent_id>880144</intent_id><project_id>839868</project_id><text_data>1.	Prime Contractor:Tub Cove Inc.7801 Lake City Way NESeattle, WA 98115Contractor#TUBCOCI91BKUBI: 602 940 2342.	University of WashingtonContact Graham SherwoodHousing &amp; Food Services/PurchasingP 206-685-9074Job site address:Blackely Village 4747 30th Ave NE Seattle, WA3.	Work Description: Removing old bath surround; prepping walls in make ready condition to prepare for installation of new Tub Cove laminate surround. Install Tub Cove laminate surround.4.	Type of Structure: Structure is a single family residential apartment.5.	Structure stories or levels: The large percentage of the structures are 4-plex family housing. Some buildings are 2 story duplex housing.6.	Building Use: Buildings are used for student family housing.7.	Answer YES or NOa.	NO-commercial use in structureb.	NO-retail use in structurec.	NO-Permanent Residenced.	NO-Rehab housee.	NO Transitional housingf.	NO-Communal dining facilityg.	NO treatment servicesh.	NO-Assisted livingi.	NO-Dormitoriesj.	NO-Counselingk.	NO-Separate room/bed rentall.	NO-Other services/usesm.	YES-Each unit has its own self-contained kitchenn.	YES-Each Dwelling Unit has its own bathroomo.	YES-There is a community facility or manager�s office on sitep.	NO-No part of structures are used by members of the general public</text_data><comment_date>2017-12-21T00:00:00</comment_date></row><row _id="row-p4r6_huwm_35r4" _uuid="00000000-0000-0000-EC62-9F98EB627E98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4r6_huwm_35r4"><intent_id>551110</intent_id><project_id>702661</project_id><text_data>Service Call #121116-0074</text_data><comment_date>2013-01-08T00:00:00</comment_date></row><row _id="row-di6r-n696.vjg4" _uuid="00000000-0000-0000-941F-3F9D45D63F34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-di6r-n696.vjg4"><intent_id>511736</intent_id><project_id>686866</project_id><text_data>Truck is an F550 Used to transport equipment and materials to and from the job site.</text_data><comment_date>2012-05-14T00:00:00</comment_date></row><row _id="row-mbe3-pnax-tf4p" _uuid="00000000-0000-0000-AF43-D5CE65532DB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbe3-pnax-tf4p"><intent_id>694639</intent_id><project_id>762304</project_id><text_data>Provide and install 3 ea. inside wires for work station data system within building</text_data><comment_date>2015-05-14T00:00:00</comment_date></row><row _id="row-c5q9-wdgp.zck4" _uuid="00000000-0000-0000-F2BA-BBB2CF7C0964" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c5q9-wdgp.zck4"><intent_id>495152</intent_id><project_id>672574</project_id><text_data>Previous landscaper fired. We will be installing topsoil and plants estimated finish of project in 3 weeks from start</text_data><comment_date>2011-12-29T00:00:00</comment_date></row><row _id="row-2vem~w7gy~t54g" _uuid="00000000-0000-0000-CF15-6A1B98E08141" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2vem~w7gy~t54g"><intent_id>1041863</intent_id><project_id>910429</project_id><text_data>ALI-Inspections on Stertil-Koni vehicle lifts in transportation dept.</text_data><comment_date>2020-02-28T00:00:00</comment_date></row><row _id="row-62ah~st38.bt73" _uuid="00000000-0000-0000-1BAA-85F19604CEC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-62ah~st38.bt73"><intent_id>1221819</intent_id><project_id>993800</project_id><text_data>ACI 21-039</text_data><comment_date>2022-03-30T00:00:00</comment_date></row><row _id="row-95fg~dik5.t42v" _uuid="00000000-0000-0000-F7BE-529F35F14BFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-95fg~dik5.t42v"><intent_id>663278</intent_id><project_id>746945</project_id><text_data>There are six different jobs for us to perform work on, five in Mount Vernon and one is Sedro Woolley.</text_data><comment_date>2014-10-30T00:00:00</comment_date></row><row _id="row-x7k5.un34_j3sg" _uuid="00000000-0000-0000-6595-8F18E3BD0F3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x7k5.un34_j3sg"><intent_id>975206</intent_id><project_id>875966</project_id><text_data>Town Center East Bldg 1101 Israel Rd. SETumwater, WA 98501</text_data><comment_date>2019-05-01T00:00:00</comment_date></row><row _id="row-5gr4-td6a.m7dg" _uuid="00000000-0000-0000-5CC3-EE0348A3199F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5gr4-td6a.m7dg"><intent_id>453298</intent_id><project_id>663650</project_id><text_data>Prime Job #111608</text_data><comment_date>2011-04-28T00:00:00</comment_date></row><row _id="row-u6tu_vv7r.ct6f" _uuid="00000000-0000-0000-5097-F875170A7677" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u6tu_vv7r.ct6f"><intent_id>738467</intent_id><project_id>781152</project_id><text_data>Nordic Project # 15901</text_data><comment_date>2015-12-18T00:00:00</comment_date></row><row _id="row-tzqs.f4qb~tuvt" _uuid="00000000-0000-0000-1283-B82919342E6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzqs.f4qb~tuvt"><intent_id>1186025</intent_id><project_id>933023</project_id><text_data>Our company will hire subcontractors who will be providing expertise on structural, mechanical, electrical, plumbing and landscaping. All contractors who will actually be performing the work will be hired by the contractor and not TVA Architects.</text_data><comment_date>2021-11-11T00:00:00</comment_date></row><row _id="row-3mkp~3yzb-d27n" _uuid="00000000-0000-0000-C6B6-0802E8FDD0DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3mkp~3yzb-d27n"><intent_id>1144877</intent_id><project_id>947687</project_id><text_data>Job #40152-1</text_data><comment_date>2021-05-14T00:00:00</comment_date></row><row _id="row-inqe.ix79.6yu6" _uuid="00000000-0000-0000-DC02-5FF174BEEFBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inqe.ix79.6yu6"><intent_id>571541</intent_id><project_id>690565</project_id><text_data>Filed by: Myrtle M Solum</text_data><comment_date>2013-05-24T00:00:00</comment_date></row><row _id="row-fuzj~fj8p~6mwi" _uuid="00000000-0000-0000-847A-D1C0D07626E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fuzj~fj8p~6mwi"><intent_id>1212914</intent_id><project_id>1000372</project_id><text_data>ASSIST WITH RELOCATION OF EXISTING DATA LINES FOR A TWO STATION RECONFIGURATION ON 2/24 AND 2/25. 3D WILL BE ONSITE AT 0830 ON 2/24 FIR TD AND FINISHED BY NOON ON 2/25.</text_data><comment_date>2022-02-21T00:00:00</comment_date></row><row _id="row-ba84_fa8w-n8xa" _uuid="00000000-0000-0000-D852-F86835CF4DF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ba84_fa8w-n8xa"><intent_id>1205774</intent_id><project_id>995983</project_id><text_data>2110009 QC</text_data><comment_date>2022-01-19T00:00:00</comment_date></row><row _id="row-785h~2fcp-6wr6" _uuid="00000000-0000-0000-7D89-7260D7B66AD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-785h~2fcp-6wr6"><intent_id>555591</intent_id><project_id>704635</project_id><text_data>First Amendment to GCCM contract CP1</text_data><comment_date>2013-02-11T00:00:00</comment_date></row><row _id="row-isj6-b4hc.hnp5" _uuid="00000000-0000-0000-009F-8B8663017EE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-isj6-b4hc.hnp5"><intent_id>606327</intent_id><project_id>718132</project_id><text_data>Filed by Katie L. Carroll.</text_data><comment_date>2013-11-26T00:00:00</comment_date></row><row _id="row-eafn.xs84.kw9m" _uuid="00000000-0000-0000-F79F-03156CAD68F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eafn.xs84.kw9m"><intent_id>1042955</intent_id><project_id>911075</project_id><text_data>service truck used to get to site and to carry any possible needed hand tools or parts</text_data><comment_date>2020-03-04T00:00:00</comment_date></row><row _id="row-2863.t4na-sxh8" _uuid="00000000-0000-0000-4DEC-BAF1E6614B32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2863.t4na-sxh8"><intent_id>712238</intent_id><project_id>769127</project_id><text_data>Add Card Reader to Access System</text_data><comment_date>2015-08-05T00:00:00</comment_date></row><row _id="row-ggv9.crdu_64c6" _uuid="00000000-0000-0000-26C3-4065B3848FA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ggv9.crdu_64c6"><intent_id>1105054</intent_id><project_id>937738</project_id><text_data>Job Number: 20124</text_data><comment_date>2020-11-20T00:00:00</comment_date></row><row _id="row-jhax.zru3-m7hf" _uuid="00000000-0000-0000-54D6-B2BE4DF703CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jhax.zru3-m7hf"><intent_id>944821</intent_id><project_id>866065</project_id><text_data>Employees drive either a 2500 or a 3500 Chevy Silverado to and from the job site. This work was annual preventative maintenance, change oil, oil filter, fuel filter, preform battery test, 27 point inspection and transfer test.</text_data><comment_date>2018-11-08T00:00:00</comment_date></row><row _id="row-kjcr.4kv6_nmq4" _uuid="00000000-0000-0000-DB29-41EDD2DB5182" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kjcr.4kv6_nmq4"><intent_id>1222077</intent_id><project_id>1006277</project_id><text_data>0722016</text_data><comment_date>2022-03-31T00:00:00</comment_date></row><row _id="row-fs2x_fzze.9x35" _uuid="00000000-0000-0000-E409-99C2844BAC06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fs2x_fzze.9x35"><intent_id>867600</intent_id><project_id>831431</project_id><text_data>General Laborer: Hand shovel rock and equipment (Laborers Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2017-10-06T00:00:00</comment_date></row><row _id="row-eihs_j9ev.a377" _uuid="00000000-0000-0000-7A03-6AFB5BACB857" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eihs_j9ev.a377"><intent_id>518987</intent_id><project_id>688443</project_id><text_data>Fringe Benefits Hourly Pension $10.96, Hourly Vacation $5.48, Hourly Holiday $1.82</text_data><comment_date>2012-06-26T00:00:00</comment_date></row><row _id="row-y8fg.d73e_3fhs" _uuid="00000000-0000-0000-C313-0275D2E18193" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8fg.d73e_3fhs"><intent_id>996700</intent_id><project_id>846932</project_id><comment_date>2019-08-06T00:00:00</comment_date></row><row _id="row-7gt3.yquy~3cm5" _uuid="00000000-0000-0000-7F64-6F2069D0F888" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7gt3.yquy~3cm5"><intent_id>1035610</intent_id><project_id>906793</project_id><text_data>#1Replace bath fans Units:95 97 99 101 103 105 107 903 905 907 909 911 913 915 917 919. #2 Apartments dwelling stick frame. #3 2 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2020-02-03T00:00:00</comment_date></row><row _id="row-zbqz_c752.fye4" _uuid="00000000-0000-0000-93ED-A221F6B3D0C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zbqz_c752.fye4"><intent_id>502003</intent_id><project_id>683393</project_id><text_data>Form filed by: Kevin Hunter</text_data><comment_date>2012-02-28T00:00:00</comment_date></row><row _id="row-x4dz-rqrk-98xu" _uuid="00000000-0000-0000-9228-D8088EE48F0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x4dz-rqrk-98xu"><intent_id>917521</intent_id><project_id>855747</project_id><text_data>0418153</text_data><comment_date>2018-07-12T00:00:00</comment_date></row><row _id="row-zbau_q4ff-9vai" _uuid="00000000-0000-0000-1D65-A735C8FB7A3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zbau_q4ff-9vai"><intent_id>1362108</intent_id><project_id>1077263</project_id><text_data>Installation of data cabling to Portables 4 and 5. New IDF in portable P5 for cabling. (2) Cat6A data ties for the new IDF to portable 2 IDF.</text_data><comment_date>2023-09-11T00:00:00</comment_date></row><row _id="row-89q8-bc6x_ne53" _uuid="00000000-0000-0000-D510-9862080BF7CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89q8-bc6x_ne53"><intent_id>562860</intent_id><project_id>702851</project_id><text_data>meridian construction 602136744 to peterson electric 601678452 to simplexgrinnell 602113334</text_data><comment_date>2013-04-03T00:00:00</comment_date></row><row _id="row-j8nr-sccz~sv8v" _uuid="00000000-0000-0000-96D6-B6470FEACABE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j8nr-sccz~sv8v"><intent_id>662830</intent_id><project_id>747649</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2014-10-28T00:00:00</comment_date></row><row _id="row-neec_6f9h~2emm" _uuid="00000000-0000-0000-FDE8-2FBD18F76F01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-neec_6f9h~2emm"><intent_id>1024893</intent_id><project_id>901036</project_id><text_data>Haz Waste workers to clear area of all debris using shovels/rakesExcavator to dig up contaminated soil and load into dump truck</text_data><comment_date>2019-12-04T00:00:00</comment_date></row><row _id="row-eez4_qmki_gmm4" _uuid="00000000-0000-0000-F2A9-537D95432D2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eez4_qmki_gmm4"><intent_id>719512</intent_id><project_id>749897</project_id><text_data>INTENT VERBAGE1. TRUCK DRIVER - DRIVING TRUCK MOUNTED HYDROSEEDER AND SKID STEER2. NOZZELMAN - SPRAYING HYDROMULCHING AND OPERATING SKID STEER3. LANDSCAPE LABORER - LOADING SEED, FERTILIZER, MULCH INTO MACHINE BE HAND AND CLEANINGNOTE: ALL FRINGE IS PAID TO DAVIS BACONVESTING:Prevailing wage contribution. If the work you perform for the Employer is subject to prevailing wage laws, then the Employer will make contributions to this Plan to help satisfy the fringe benefit requirements of the law. You will receive this contribution based on work you perform during a Plan Year that is subject to the law. The contribution is 100% vested PARTICIPATION:If you are working under a prevailing wage contract, then for purposes of receiving any prevailing wage contribution made to the Plan, you are eligible to participate on the date your employment is covered under the contract and will enter the Plan on that date, unless the prevailing wage contract provides otherwise.</text_data><comment_date>2015-09-08T00:00:00</comment_date></row><row _id="row-d3g9.nx7j_44sg" _uuid="00000000-0000-0000-9850-BCC87771578F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d3g9.nx7j_44sg"><intent_id>663384</intent_id><project_id>745767</project_id><text_data>Install Insulation, SIngle Family, Single Story, No, No, Yes, No, No, No, No, No, No, No, No, Yes, Yes, No, No.</text_data><comment_date>2014-10-31T00:00:00</comment_date></row><row _id="row-b4nt_zsb7-gjeu" _uuid="00000000-0000-0000-5654-2FD651F80B68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b4nt_zsb7-gjeu"><intent_id>991294</intent_id><project_id>857594</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2019-07-11T00:00:00</comment_date></row><row _id="row-mfem~za5h-8qgs" _uuid="00000000-0000-0000-E51C-9B4609C1A92E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mfem~za5h-8qgs"><intent_id>515513</intent_id><project_id>686957</project_id><text_data>1.  Provide software programming of the chiller upgrade and DDc upgrade.2.  No.3.  3. Siemens' BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building's HVAC automations system. That system is used to control the system's functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor aout the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 4.  Laptop Computer5.  No - None.</text_data><comment_date>2012-06-06T00:00:00</comment_date></row><row _id="row-2zf7_rd9u.v39b" _uuid="00000000-0000-0000-9EE7-64F521559B2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2zf7_rd9u.v39b"><intent_id>957507</intent_id><project_id>854618</project_id><text_data>Standard Textile Co Inc is filing on behalf of Ultimate Shutters and Blinds due to failure to file.</text_data><comment_date>2019-01-29T00:00:00</comment_date></row><row _id="row-xge5_u7re-sadx" _uuid="00000000-0000-0000-145B-7A6AB0BFAB9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xge5_u7re-sadx"><intent_id>829881</intent_id><project_id>819479</project_id><text_data>3177618</text_data><comment_date>2017-05-01T00:00:00</comment_date></row><row _id="row-3hqw-2arf~n377" _uuid="00000000-0000-0000-FD68-9B425CD0C007" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3hqw-2arf~n377"><intent_id>947736</intent_id><project_id>865921</project_id><text_data>18-23-2648</text_data><comment_date>2018-11-27T00:00:00</comment_date></row><row _id="row-4gxp.ryf9_5tmj" _uuid="00000000-0000-0000-CDE0-468207480CD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4gxp.ryf9_5tmj"><intent_id>505980</intent_id><project_id>685166</project_id><text_data>HIF # 12113833,HIF # 12115994, HIF # 12122076, HIF # 12122325, HIF # 12128267, HIFF # 12128644, HIF #12128655, HIF # 12131691, HIF # 12133621, HIF # 12136646, HIF # 12140600, HIF # 12140834, HIF # 12149919, HIF # 12150001, HIF # 12150096, HIF # 12150173</text_data><comment_date>2012-03-30T00:00:00</comment_date></row><row _id="row-v8sh_ttf4_6a43" _uuid="00000000-0000-0000-C890-A52E38F4A944" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8sh_ttf4_6a43"><intent_id>1419067</intent_id><project_id>1120100</project_id><text_data>9940501</text_data><comment_date>2024-04-14T00:00:00</comment_date></row><row _id="row-hxsf~ihuv-d3n3" _uuid="00000000-0000-0000-5690-0F2ACB29332A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxsf~ihuv-d3n3"><intent_id>823885</intent_id><project_id>809598</project_id><text_data>April 10, 2017Dear Department of Labor and Industries,Star Marine Inc. is not required to have industrial insurance through the Department of Labor and Industries therefore does not have an account. We have industrial insurance through Jones Act.Sincerely,Tonya J. HuntOffice ManagerStar Marine Inc.206-842-7198</text_data><comment_date>2017-05-09T00:00:00</comment_date></row><row _id="row-stpc-gmz9_e93p" _uuid="00000000-0000-0000-8941-6DC4D4A9D46B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-stpc-gmz9_e93p"><intent_id>1465873</intent_id><project_id>1071832</project_id><text_data>Semi truck- Trailer</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-up7z-whan-5bg6" _uuid="00000000-0000-0000-9CBD-6D9EFC1FC164" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-up7z-whan-5bg6"><intent_id>1465711</intent_id><project_id>1144624</project_id><text_data>non routine maintenance</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-dfq9_x9ma_v9g2" _uuid="00000000-0000-0000-88D1-4F2EDA18D251" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfq9_x9ma_v9g2"><intent_id>471935</intent_id><project_id>669494</project_id><text_data>Was awaiting response from the prime contractor concerning the other portions of the whole project. The information I was provided by the prime contractor follows:This project includes the renovation of a 536 square foot historic bathhouse structure and various site improvements to parking, trails and storm water collection. The whole project is broken down into several subsets. The first is the renovation of an historic structure (completed by others). The second is a new storm drain and filter (completed by others). The third is the development of an ADA path to the Historic structure (completed by others). The forth if repaving the parking lot (completed by others). The landscaping portion of the plan consists of spreading topsoil over the disturbed areas of lawn, around the trail and over the storm drain trench to a maximum depth of 6 inches. The second area of landscaping consists of planting native plants above grade (no excavation is allowed due to Native American artifacts) in areas designated by the park.The following information is the information requested concerning our portion of the project only. Tasks Performed:Install Topsoil to a maximum depth of 6&amp;quot;Install Mulch to a depth of 4&amp;quot;PlantingInstall temporary above ground manual irrigation systemEquipment and tools used:MT 52 mini skid steer for material transportThomas 1300 skid steer for material transportRakesWheelbarrowsShovelsBroomsHand Rollers</text_data><comment_date>2011-09-19T00:00:00</comment_date></row><row _id="row-fp6w-7kgv.v7ct" _uuid="00000000-0000-0000-1246-65B33098C282" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fp6w-7kgv.v7ct"><intent_id>643474</intent_id><project_id>723820</project_id><text_data>PENHALL JOB # 230930</text_data><comment_date>2014-07-25T00:00:00</comment_date></row><row _id="row-2iji_u66p~ap5x" _uuid="00000000-0000-0000-F14F-25CD80C7821A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2iji_u66p~ap5x"><intent_id>844061</intent_id><project_id>815309</project_id><text_data>NEESER HIRED US</text_data><comment_date>2017-06-28T00:00:00</comment_date></row><row _id="row-79jh~ziif-pjmh" _uuid="00000000-0000-0000-D281-6AD774005CA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-79jh~ziif-pjmh"><intent_id>674741</intent_id><project_id>753653</project_id><text_data>1-Wood Deck Repairs 2-apartment 3-no 4-residential a-no b-no c-yes d-no e-no f-no g-no h-no i-no j-no k-no 5-yes 6-yes 7-no 8-no</text_data><comment_date>2015-01-15T00:00:00</comment_date></row><row _id="row-j948~nxma~2tx2" _uuid="00000000-0000-0000-8F64-4605D5B13D22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j948~nxma~2tx2"><intent_id>673401</intent_id><project_id>746807</project_id><text_data>1.  What is the specific purpose of this awarding agency&amp;#39;s public works project?  Remodel existing building, Construct parking garage, update electrical wiring in East Wing, install new heat pump, etc. 2.  Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?  No. 3.  Does this project entail the remodeling or new construction of a facility?  Yes, but not performed by Siemens Employees. 4.  If your firm is working upon a type of building system, what type of system is involved?  HVAC/refrigeration control system.5.  What specific tasks did your employees perform?  Siemens&amp;#39; BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process.   While off-site, the BAU Technicians create a computerized schematic of a particular building&amp;#39;s HVAC automations system.  The system is used to control the system&amp;#39;s functions after the mechanical commissioning process is complete.  Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer.  The BAU Technician typically sits in a central control room and manipulates the system using a computer program.  The program itself informs the Technician whether various components are functioning properly as they are triggered.  If a component doesn&amp;#39;t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified.  After confirming that the automation system is opertating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface.  Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.  6.  What, if any, tools did your employees use in the performance of those tasks?  Laptop Computer. 7.  If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks?  No-none. 8.  Are you going to be hiring any subcontractors for this project?  Yes.</text_data><comment_date>2015-01-13T00:00:00</comment_date></row><row _id="row-iyfs-b3zv_muge" _uuid="00000000-0000-0000-FCD1-E7A2688B8EDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iyfs-b3zv_muge"><intent_id>888577</intent_id><project_id>843852</project_id><text_data>This is the second term of the three year contract for Landscape Maintenance for various City of Everett locations.  This project consists of mowing, edging, trimming, bed care, pruning, and leaf fall removal from all sites. Equipment to be used will include walk behind mowers, weedeaters, pruning shears, backpack blowers for clean up, rakes, shovels, buckets, and hoes as required to complete the maintenance services of the established planting and turf areas for these City of Everett sites.</text_data><comment_date>2018-02-15T00:00:00</comment_date></row><row _id="row-gmvt~7yzu.iymw" _uuid="00000000-0000-0000-4B21-1D2CBB7B1E29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gmvt~7yzu.iymw"><intent_id>1221601</intent_id><project_id>1005984</project_id><text_data>Job#615088</text_data><comment_date>2022-03-29T00:00:00</comment_date></row><row _id="row-mkc3_2k35.84en" _uuid="00000000-0000-0000-4439-A176EFA2B43E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mkc3_2k35.84en"><intent_id>1071183</intent_id><project_id>924972</project_id><text_data>NW PENSION 9.00 LOCAL APPR 1.10 HEALTH CARE / VEB 12.77 ORG TRUST 1.00 IND FUND 0.65 NATL PENSION 4.24 ITI/NEMI/SMOHI 0.17 NW SUPPLEMENTAL 0.79 CLEAN CARD 0.07   TOTAL 29.79</text_data><comment_date>2020-07-09T00:00:00</comment_date></row><row _id="row-as7y~8de4~gshg" _uuid="00000000-0000-0000-BB1C-53B2CC8DE6CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-as7y~8de4~gshg"><intent_id>1277395</intent_id><project_id>1036830</project_id><text_data>The function of the photo eye is stop the door from closing if anything is in the way - The duties is as listed above, they re-ran the photo eye wire from the photo eyes to the operator (motor) I'm not sure how to make that any clearer.</text_data><comment_date>2022-12-06T00:00:00</comment_date></row><row _id="row-baw4~af2r~cxny" _uuid="00000000-0000-0000-66FF-CD3741137EB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-baw4~af2r~cxny"><intent_id>1268245</intent_id><project_id>1031911</project_id><text_data>9898033</text_data><comment_date>2022-09-21T00:00:00</comment_date></row><row _id="row-ek7j-5j4m_2j6x" _uuid="00000000-0000-0000-DF55-FB8CBDD5498F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ek7j-5j4m_2j6x"><intent_id>1237327</intent_id><project_id>1015448</project_id><text_data>E/T truck to Vac and clean storm vault. Clean vault and hydro -jet drain that is at the bottom of the vault.?</text_data><comment_date>2022-06-16T00:00:00</comment_date></row><row _id="row-8tsv~scvs~4f7f" _uuid="00000000-0000-0000-9EDC-477E5E4CA03E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8tsv~scvs~4f7f"><intent_id>1243330</intent_id><project_id>978660</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.  Installation of mirrors and wire shelving#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?  apartments#3 - Including any basement or garage, how many stories or levels does the structure have?  three#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure?  no(b) Any retail use in the structure? No(c) Permanent residence only? yes(d) Rehabilitation house?  no(e) Transitional housing?  no(f) Communal dining facility?  no(g) Treatment services?  no(h) Assisted living services?  no(i) Dormitories?   no(j) Counseling?  no(k) Is each room and/or bed in the structure rented separately?  yes(l) Other services or uses?  no#5 - Does each dwelling unit have its own self-contained kitchen?  yes#6 - Does each dwelling unit have its own bathroom? Yes#7 - Is there a community facility or manager�s office on site? yes#8 - Is any part of the structure used by members of the public?  no</text_data><comment_date>2022-07-11T00:00:00</comment_date></row><row _id="row-fy6t~kwpv_yxsj" _uuid="00000000-0000-0000-2D60-9A8FE7AC9CC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fy6t~kwpv_yxsj"><intent_id>1067364</intent_id><project_id>923265</project_id><text_data>#1 Renovations to include accessibility and useful life house improvements #2 SFD#3 (1) level each property#4 (l) Other #5 Yes #6 Yes#7 na #8 No</text_data><comment_date>2020-06-23T00:00:00</comment_date></row><row _id="row-6hp4_eda7_cn9q" _uuid="00000000-0000-0000-1D87-328A45131B26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6hp4_eda7_cn9q"><intent_id>1235765</intent_id><project_id>1005039</project_id><text_data>GU Job #22158Truck Driver: Water Tank Truck (0-3000) gallons. Purpose: Dust control.Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2022-05-23T00:00:00</comment_date></row><row _id="row-kjc3-tre7-smvg" _uuid="00000000-0000-0000-9C27-1DEB99BFE060" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kjc3-tre7-smvg"><intent_id>536691</intent_id><project_id>694219</project_id><text_data>Dump Truck = Driver/Dump 6-12CYDump Truck and Trailer = Driver/Truck and Pup</text_data><comment_date>2012-09-26T00:00:00</comment_date></row><row _id="row-7ggx~2yzy.2fwi" _uuid="00000000-0000-0000-8536-27ACC700F81B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ggx~2yzy.2fwi"><intent_id>696918</intent_id><project_id>763315</project_id><text_data>Data CablingLAN(Local Area Network)Inside Work</text_data><comment_date>2015-05-28T00:00:00</comment_date></row><row _id="row-wcc2-ts67~7xnx" _uuid="00000000-0000-0000-4CCC-F56DCE76F495" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wcc2-ts67~7xnx"><intent_id>846607</intent_id><project_id>815365</project_id><text_data>Oldcastle is a self insured company Oldcastle Precast believes that the work and hours described in this Intent to Pay Prevailing Wage and/or Affidavit of Wages Paid is not subject to payment of prevailing wage. Oldcastle Precast�s filing of an Intent to Pay Prevailing Wage and/or Affidavit of Wages Paid may not be construed in any manner whatsoever as an acknowledgement or agreement that the work and hours described therein are subject to payment of prevailing wage.</text_data><comment_date>2017-07-11T00:00:00</comment_date></row><row _id="row-2gin-pxpm_99ac" _uuid="00000000-0000-0000-53C2-67DE54532792" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2gin-pxpm_99ac"><intent_id>677448</intent_id><project_id>754910</project_id><text_data>Job Order Contract RTA/CN 0008-13, Contract Purchase Order No. 141074 OBWork Order No. 034 - 148823 ODSound Transit</text_data><comment_date>2015-02-02T00:00:00</comment_date></row><row _id="row-m5m5_jk2g.apyg" _uuid="00000000-0000-0000-50AB-1A3500437138" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m5m5_jk2g.apyg"><intent_id>1469471</intent_id><project_id>1107156</project_id><text_data>Hess Hauling is an Owner Operator trucking business only. No Employees</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-2rt2.4zpz-ucjk" _uuid="00000000-0000-0000-CC8A-69D40C209B08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2rt2.4zpz-ucjk"><intent_id>1469373</intent_id><project_id>1146469</project_id><text_data>9939191</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-ir7v.c7in_tf65" _uuid="00000000-0000-0000-9347-B284B1AF1897" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ir7v.c7in_tf65"><intent_id>666441</intent_id><project_id>749139</project_id><text_data>Temporary pumps and hoses were used in place of City of Everett&amp;#39;s pumps due to there failure. Vehicles used were our delivery trucks. No tools were used and these pumps and hoses due to them having manual locking arms and don&amp;#39;t require tools. The pumps suction hose and discharge hose were not connected to anything. They were both put into 2 different vaults not connected to anything.</text_data><comment_date>2014-12-03T00:00:00</comment_date></row><row _id="row-bpt3_j5nx-rwh2" _uuid="00000000-0000-0000-B767-B659BE105087" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bpt3_j5nx-rwh2"><intent_id>774089</intent_id><project_id>757586</project_id><text_data>PC6 JOB #6076</text_data><comment_date>2016-07-12T00:00:00</comment_date></row><row _id="row-zxfu.mz9c-pmhz" _uuid="00000000-0000-0000-963B-655B9096532F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxfu.mz9c-pmhz"><intent_id>1131607</intent_id><project_id>955788</project_id><text_data>Modern Glass is an Idaho-based contractor. Our Idaho w/c covers our Idaho-based employees when they work in WA.</text_data><comment_date>2021-03-25T00:00:00</comment_date></row><row _id="row-eiaf-kfws_xtv6" _uuid="00000000-0000-0000-DDB6-E1DEA88A7F51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eiaf-kfws_xtv6"><intent_id>769378</intent_id><project_id>780508</project_id><text_data>Filed by Debra McGAvran</text_data><comment_date>2016-06-20T00:00:00</comment_date></row><row _id="row-k4nj-5fyn_c4sb" _uuid="00000000-0000-0000-B0CF-D08128A87475" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k4nj-5fyn_c4sb"><intent_id>860616</intent_id><project_id>825192</project_id><text_data>Filed by John Charltou</text_data><comment_date>2017-09-05T00:00:00</comment_date></row><row _id="row-2bej.zuhk.xdzw" _uuid="00000000-0000-0000-D9FE-B5DB09B07A3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2bej.zuhk.xdzw"><intent_id>1048018</intent_id><project_id>892046</project_id><text_data>Whole Proj:  New masonry pump station with 6 pumps (3600 gpm), two pressure tanks (2640 gallons)Our Work:  The beautification of areas adjacent to pump station through the installation of topsoil, soil amendment, trees, shrubs, groundcover bark mulch and native seed mix.Equip:  Mini excavator &amp; backhoe (both under the threshold of 90hp) and hand toolsOther Trucks:  KW Equipment truck &amp; trailer and Chevy Tiltmaster &amp; trailer used to haul materials and equip to site.</text_data><comment_date>2020-03-26T00:00:00</comment_date></row><row _id="row-n3hi_btk6~igfq" _uuid="00000000-0000-0000-21AB-7B499D7D06E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n3hi_btk6~igfq"><intent_id>557387</intent_id><project_id>705495</project_id><text_data>Several Manufactured homes within Mountain View MHP</text_data><comment_date>2013-02-22T00:00:00</comment_date></row><row _id="row-kgsm.uk79_gvk6" _uuid="00000000-0000-0000-9CC4-753D01CD6217" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kgsm.uk79_gvk6"><intent_id>1339339</intent_id><project_id>1074533</project_id><text_data>Artech crew to clean outdoor public sculptures using soft cloths or brushes, water, mild soap, and pressure washer (as needed). Apply protective coatings with soft cloths or brushes as needed. Clear debris away from sculpture platforms or bases as needed.</text_data><comment_date>2023-06-23T00:00:00</comment_date></row><row _id="row-guv9_zimt~4hqi" _uuid="00000000-0000-0000-EB11-2B0DFD55504F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-guv9_zimt~4hqi"><intent_id>853165</intent_id><project_id>825587</project_id><text_data>1-Install bath fan and timer control2-yes3-one4-a)no, b)no, c)yes, d-l)no5-yes6-yes7-don&amp;#39;t know8-no</text_data><comment_date>2017-08-07T00:00:00</comment_date></row><row _id="row-gbyb_yukj~dpvz" _uuid="00000000-0000-0000-DC0D-D170D121817F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbyb_yukj~dpvz"><intent_id>796383</intent_id><project_id>804088</project_id><text_data>Owner to preform work (No Employees)</text_data><comment_date>2016-10-17T00:00:00</comment_date></row><row _id="row-dym4~msaj~zc53" _uuid="00000000-0000-0000-D45B-8A943A7E3BA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dym4~msaj~zc53"><intent_id>590846</intent_id><project_id>718891</project_id><text_data>M ERICKSON 18015 CLEARKAKE BLVD SE YELM, WA 98597</text_data><comment_date>2013-08-29T00:00:00</comment_date></row><row _id="row-d9nr_6xih-ksyk" _uuid="00000000-0000-0000-D716-043501866382" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d9nr_6xih-ksyk"><intent_id>816198</intent_id><project_id>813578</project_id><text_data>Use brooms and dust mops to sweep floors followed by using buffers and wet dry vacuum to clean, screen and dry the floor.  Then we use EZway applicator to apply gym floor finish.</text_data><comment_date>2017-02-25T00:00:00</comment_date></row><row _id="row-hxsu~rs5f.87ut" _uuid="00000000-0000-0000-FF0E-339F3FA0FBDA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxsu~rs5f.87ut"><intent_id>1251467</intent_id><project_id>1022836</project_id><text_data>74420-0104</text_data><comment_date>2022-07-22T00:00:00</comment_date></row><row _id="row-hgp4.d532_trsa" _uuid="00000000-0000-0000-DA66-B614B5B926B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hgp4.d532_trsa"><intent_id>840134</intent_id><project_id>824219</project_id><text_data>Filed by Pete Russell.</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-b47f-mdai~xrye" _uuid="00000000-0000-0000-01F3-89876DF5F574" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b47f-mdai~xrye"><intent_id>1087667</intent_id><project_id>932457</project_id><text_data>Includes: - Evaluation 08.03.2020- Remove and replace two blown fuses with new fuses- Repair damaged conduit- COVID-19 Personal Protection Equipment- Environmental/consumable charge- Prevailing wage filing fee- Labor, portal to portal- Zone charge8/31/2020: Technician arrived on site to complete quoted repairs. Technician removed and replaced the conduit and wiring from the compactor to the power unit for the interlock switch. Replaced (2) blown fuses. Tested functions and the ram would not move. Technician determined that the cylinders are bypassing. Recommend replacing the cylinders and cylinder pins. Purge and replace oil. SWS Equipment to provide quote for labor.</text_data><comment_date>2020-09-14T00:00:00</comment_date></row><row _id="row-7wmz.yt3r~ujau" _uuid="00000000-0000-0000-161A-A890C5488FBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7wmz.yt3r~ujau"><intent_id>1036218</intent_id><project_id>907147</project_id><text_data>#1 � The crew will be performing an electrical safety inspection and electrical repairs#2 - Manufactured Home#3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2020-02-05T00:00:00</comment_date></row><row _id="row-5kzs~qsyi-5e3c" _uuid="00000000-0000-0000-1CB3-FA335E75089C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5kzs~qsyi-5e3c"><intent_id>1266497</intent_id><project_id>1021067</project_id><text_data>We will be installing topsoil and bark using a conveyor truck. We will be installing trees and plants using various hand tools such as shovels and rakes. We will also be installing an irrigation system, not to exceed 36 inches in depth and no subsurface water collection system.</text_data><comment_date>2022-09-14T00:00:00</comment_date></row><row _id="row-n8hn-eg6x.pqqw" _uuid="00000000-0000-0000-FC12-126B2998A747" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n8hn-eg6x.pqqw"><intent_id>615398</intent_id><project_id>724395</project_id><text_data>Hiring Company has been corrected to reflect BARCLAY DEAN ARCHTL PRDTS LLC</text_data><comment_date>2014-02-11T00:00:00</comment_date></row><row _id="row-efhi-9jkc.xkp6" _uuid="00000000-0000-0000-25D2-027C93560A87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efhi-9jkc.xkp6"><intent_id>1245967</intent_id><project_id>1020290</project_id><text_data>#1- heat pump install; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2022-07-01T00:00:00</comment_date></row><row _id="row-niz8-8ibw.bffp" _uuid="00000000-0000-0000-22D3-3791F29095D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-niz8-8ibw.bffp"><intent_id>1109907</intent_id><project_id>943566</project_id><text_data>Apartments#1 - Describe the work that your firm was contracted to perform INSULATION#2 - Is the structure a single family dwelling NO , duplex NO, apartment YES, condominium NO, or other residential structure? NO 6711 106th Ave Ne, Kirkland, WA 98033 is a multi family home built in 1978#3 - Including any basement or garage, how many stories or levels does the structure have 3#4 - What is the building used for? --Answer 'yes' or 'no' to each of the following options:(a)	Any commercial use in the structure? NO(b)	Any retail use in the structure? NO(c)	Permanent residence only? YES(d)	Rehabilitation house? NO(e)	Transitional housing? NO(f)	Communal dining facility? NO(g)	Treatment services? NO(h)	Dormitories? NO (i) Counseling? NO</text_data><comment_date>2020-12-15T00:00:00</comment_date></row><row _id="row-tvjg-sq72-gt43" _uuid="00000000-0000-0000-42A8-FBC89ABD4A2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tvjg-sq72-gt43"><intent_id>649084</intent_id><project_id>731359</project_id><text_data>Project consists of installing soil, bark, and plant material.  Irrigation installation consists of installing mainline irrigation, laterals and drip irrigation for planting areas. Trenching and irrigation lines will be to a depths of 12-18&amp;quot;.</text_data><comment_date>2014-08-19T00:00:00</comment_date></row><row _id="row-z7yk-p5sn_dt37" _uuid="00000000-0000-0000-6B8B-730DE14911C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7yk-p5sn_dt37"><intent_id>460563</intent_id><project_id>663166</project_id><text_data>1. Energy improvements to onsite programming.2. No3. Writing programming for HVAC system controls using a laptop4. Laptop only5. No</text_data><comment_date>2011-06-14T00:00:00</comment_date></row><row _id="row-yemk-x7au-drba" _uuid="00000000-0000-0000-C6C2-491190D83651" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yemk-x7au-drba"><intent_id>1051999</intent_id><project_id>912893</project_id><text_data>This intent will replace the combined form filed on 3/18 # 923460</text_data><comment_date>2020-04-16T00:00:00</comment_date></row><row _id="row-gish_z9zf.xwj6" _uuid="00000000-0000-0000-4473-FE8960054B5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gish_z9zf.xwj6"><intent_id>1127789</intent_id><project_id>953747</project_id><text_data>Haz Waste workers to clear all debris on vessel using shovel/rake/broom and remove any fuel using a small hand pump, dumping into a haz waste container</text_data><comment_date>2021-03-10T00:00:00</comment_date></row><row _id="row-yufu-ae5g.zfrt" _uuid="00000000-0000-0000-D16C-A43923BB2306" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yufu-ae5g.zfrt"><intent_id>886879</intent_id><project_id>836242</project_id><text_data>1117160</text_data><comment_date>2018-02-06T00:00:00</comment_date></row><row _id="row-an4v-wc7z~4dyk" _uuid="00000000-0000-0000-88F3-F5A52E864573" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-an4v-wc7z~4dyk"><intent_id>754352</intent_id><project_id>788279</project_id><text_data>The structure is not transitional housing - contractor had previously given incorrect information.  Per the property owner, the structure will be used for low income permanent housing and each unit will be rented separately.</text_data><comment_date>2016-05-09T00:00:00</comment_date></row><row _id="row-7xvn-d9e7_8eic" _uuid="00000000-0000-0000-5F6F-4013147C8FD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7xvn-d9e7_8eic"><intent_id>655296</intent_id><project_id>744666</project_id><text_data>Mainline broken by driveway, access to pipe as needed. 4' X 3' X 3'. Found broken 2&amp;quot; PVC. Repaired as needed. Replaced up to 3' X 2&amp;quot; PVC. Tested OK.</text_data><comment_date>2014-09-17T00:00:00</comment_date></row><row _id="row-fag8.hfds-ydz3" _uuid="00000000-0000-0000-155E-0FB5F0C357BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fag8.hfds-ydz3"><intent_id>953431</intent_id><project_id>851159</project_id><text_data>1190002 - North Bend City Hall</text_data><comment_date>2019-01-04T00:00:00</comment_date></row><row _id="row-5tpz_8mkf.zian" _uuid="00000000-0000-0000-6420-D2A7B7E9B0CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5tpz_8mkf.zian"><intent_id>1063487</intent_id><project_id>898182</project_id><text_data>Installing CAT6 cabling</text_data><comment_date>2020-06-08T00:00:00</comment_date></row><row _id="row-qsmu_i2qi.i3cz" _uuid="00000000-0000-0000-9C42-F6B6D3A24F76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qsmu_i2qi.i3cz"><intent_id>697713</intent_id><project_id>759367</project_id><text_data>Install wiremold, pull riser cable (1158677)</text_data><comment_date>2015-06-01T00:00:00</comment_date></row><row _id="row-pqge.s7xu.gmsf" _uuid="00000000-0000-0000-6BAE-B9D09DBFD07B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqge.s7xu.gmsf"><intent_id>1183999</intent_id><project_id>977553</project_id><text_data>Labor and materials for installation of low voltage telecommunications cabling inside a building for the purpose of networking personal computers.</text_data><comment_date>2021-10-07T00:00:00</comment_date></row><row _id="row-3t6a.2f3t.9yr8" _uuid="00000000-0000-0000-5D71-2189B81A255A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3t6a.2f3t.9yr8"><intent_id>1237035</intent_id><project_id>1015272</project_id><text_data>Other Trucks - Water Truck (0-8,000 gallons) and low boy</text_data><comment_date>2022-05-27T00:00:00</comment_date></row><row _id="row-9esq_wen6~wuhq" _uuid="00000000-0000-0000-C008-C18ED2DF47CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9esq_wen6~wuhq"><intent_id>572769</intent_id><project_id>712288</project_id><text_data>Job # 297157</text_data><comment_date>2013-06-03T00:00:00</comment_date></row><row _id="row-tatu-r68t_7v5a" _uuid="00000000-0000-0000-8388-B50FEB7CCD7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tatu-r68t_7v5a"><intent_id>763432</intent_id><project_id>789978</project_id><text_data>Didn&amp;#39;t know there was such a classification as an Insulation Applicator. Correction made. Thank you.</text_data><comment_date>2016-06-10T00:00:00</comment_date></row><row _id="row-pnks-q2zx-k4zu" _uuid="00000000-0000-0000-CC64-8C64404FB760" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pnks-q2zx-k4zu"><intent_id>1169600</intent_id><project_id>971488</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2021-08-17T00:00:00</comment_date></row><row _id="row-cqh3.8433~4hhg" _uuid="00000000-0000-0000-1174-B16D3562D6CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqh3.8433~4hhg"><intent_id>804124</intent_id><project_id>808000</project_id><text_data>This is for a ductless heat pump single family dwelling, not used for business in any way. 2 story permanent residence not used with rental rooms.  1.5 bathrooms w/3 bedrooms</text_data><comment_date>2016-11-23T00:00:00</comment_date></row><row _id="row-87e9_chmq.m3rf" _uuid="00000000-0000-0000-5B27-6149F4AAF3C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87e9_chmq.m3rf"><intent_id>1336282</intent_id><project_id>1023648</project_id><text_data>Gary Harper #338</text_data><comment_date>2023-06-14T00:00:00</comment_date></row><row _id="row-2mj2~txcy.n2h4" _uuid="00000000-0000-0000-15C1-BC7FC54F6A64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2mj2~txcy.n2h4"><intent_id>556051</intent_id><project_id>704846</project_id><text_data>Mowing, weeding, edge trimming, pruning, raking and blowing of surfaces.</text_data><comment_date>2013-02-13T00:00:00</comment_date></row><row _id="row-i6uw.m2kp.uxzk" _uuid="00000000-0000-0000-77A5-FB02A9FD389B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i6uw.m2kp.uxzk"><intent_id>873189</intent_id><project_id>833815</project_id><text_data>Set up &amp; operated truck mounted crane to deliver equipment to job site.</text_data><comment_date>2017-12-22T00:00:00</comment_date></row><row _id="row-fu2u-74qw-4t4j" _uuid="00000000-0000-0000-8B05-593648A718EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fu2u-74qw-4t4j"><intent_id>1007555</intent_id><project_id>893444</project_id><text_data>303057</text_data><comment_date>2019-09-16T00:00:00</comment_date></row><row _id="row-kaep-42cz.h4hi" _uuid="00000000-0000-0000-8CCF-5334EEA9E0CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kaep-42cz.h4hi"><intent_id>766791</intent_id><project_id>793355</project_id><text_data>ECI Job 9836</text_data><comment_date>2016-06-07T00:00:00</comment_date></row><row _id="row-srmp-6q6d_qmc8" _uuid="00000000-0000-0000-7A9B-988306662C04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-srmp-6q6d_qmc8"><intent_id>548428</intent_id><project_id>698067</project_id><text_data>Form filed by: Michael HummelState of WA - Dept. of L&amp;I - Prevailing Wage DivisionExemption Intent Questionnaire form - Fire Station 34Prevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:****** 1.  What was the purpose of the project?    The purpose of this project is to provide software programming for both Phase-1 &amp; 2 training, control of the HW system, control of the existing AC-1, control of the Exhaust Fans (EF-1 4 / 4-Total, control of the Finned Tube Radiators / Baseboard Heaters (5-total), monitoring of the temperatures in Rooms 109 (2), 114, 115, 116 &amp; 201 and monitoring of the Generator status signal.****** 2.  Does this project entail the remodeling or new construction of a facility?    Yes, but not performed by Siemens Employees.****** 3.  What specific tasks did your employees perform?    Siemens' BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.****** 4.  What if any tools did your employees use in the performance of those tasks?   Laptop computer****** 5.  If your employee used no tools, did they engage in any other type of manual, hands on efforts in completing their tasks?    No - none.To expedite our determination, please be as detailed as possible in responding to these questions.  For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form. To expedite our determination, please be as detailed as possible in responding to these questions.  For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2012-12-13T00:00:00</comment_date></row><row _id="row-rihp.ae7v.6d59" _uuid="00000000-0000-0000-309E-B540D7378298" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rihp.ae7v.6d59"><intent_id>828593</intent_id><project_id>818947</project_id><text_data>Signatory to Fire Sprinkler Fitters Road Local 669, District 21</text_data><comment_date>2017-04-24T00:00:00</comment_date></row><row _id="row-8zxw~49p6-5nkm" _uuid="00000000-0000-0000-6FFE-4EFA8DCE67CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zxw~49p6-5nkm"><intent_id>1204845</intent_id><project_id>995363</project_id><text_data>Dispatched to water cleanup on 11/26/21 that occurred in the aux gym. Arrived onsite and assessed the situation. Set up 1 negative air. Sprayed antimicrobial and monitored moisture levels. Tools used: hammer, pry bar, containment, debris bags and moisture meter.</text_data><comment_date>2022-01-14T00:00:00</comment_date></row><row _id="row-uh68~fjuh-bin3" _uuid="00000000-0000-0000-2B4B-AE323F404CD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uh68~fjuh-bin3"><intent_id>1067494</intent_id><project_id>923323</project_id><text_data>33251</text_data><comment_date>2020-06-24T00:00:00</comment_date></row><row _id="row-56rh-jg34_w3u5" _uuid="00000000-0000-0000-1473-184DA01FC7B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-56rh-jg34_w3u5"><intent_id>624137</intent_id><project_id>732696</project_id><text_data>MMCI#099404</text_data><comment_date>2014-04-09T00:00:00</comment_date></row><row _id="row-tpd3.h5xy.28nw" _uuid="00000000-0000-0000-CFF9-6D3AFF569F03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tpd3.h5xy.28nw"><intent_id>620758</intent_id><project_id>731168</project_id><text_data>(Water Truck Tank (0-8000 gallons))</text_data><comment_date>2014-03-18T00:00:00</comment_date></row><row _id="row-ywu2.euaf-q8gb" _uuid="00000000-0000-0000-3A26-2473AC959B04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ywu2.euaf-q8gb"><intent_id>992393</intent_id><project_id>861445</project_id><text_data>Work performed by the Telecommunication Technicians is installing Cat6 cabling for data indoors.  The purpose of the data cabling being installed is for computer networking.  Physical location: 902 Rocky Rd NE, Orting, WA  98360</text_data><comment_date>2019-07-17T00:00:00</comment_date></row><row _id="row-c4n7~h25s~qwxn" _uuid="00000000-0000-0000-819A-2EBABAAE4465" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c4n7~h25s~qwxn"><intent_id>630393</intent_id><project_id>741383</project_id><text_data>Removing 20 year old bus wash (two of them), using a forklift, cleaning the building bay walls with a pressure washer, installing new drain trench assemblies with saw cutters, hammering out concrete, pulling out old trenches, re-pouring concrete, Re-installing two new bus washes with forklifts</text_data><comment_date>2014-08-20T00:00:00</comment_date></row><row _id="row-w2vh.zusx~eua3" _uuid="00000000-0000-0000-1E75-46EB8741B901" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w2vh.zusx~eua3"><intent_id>965037</intent_id><project_id>875477</project_id><text_data>#1-We were contracted to fix the thermostat on the furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2019-03-19T00:00:00</comment_date></row><row _id="row-zqt5~3s6p-pnew" _uuid="00000000-0000-0000-C070-57050F6EB928" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zqt5~3s6p-pnew"><intent_id>821304</intent_id><project_id>815872</project_id><text_data>Photo of &amp;quot;personally designed equipment&amp;quot; sent to PW1@lni.wa.gov, 3/27/2017, 8:12 am.</text_data><comment_date>2017-03-27T00:00:00</comment_date></row><row _id="row-pjh4-8yqw~9u4t" _uuid="00000000-0000-0000-FD96-62E8FD63451F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjh4-8yqw~9u4t"><intent_id>564225</intent_id><project_id>702140</project_id><text_data>The prime hired us</text_data><comment_date>2013-04-11T00:00:00</comment_date></row><row _id="row-inpk-qf2s-4xkx" _uuid="00000000-0000-0000-4E77-F1A6B9C0DE41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inpk-qf2s-4xkx"><intent_id>867196</intent_id><project_id>820347</project_id><text_data>Hydroseeding for beautification purpose</text_data><comment_date>2017-10-05T00:00:00</comment_date></row><row _id="row-3atk-sesf-n64n" _uuid="00000000-0000-0000-F0BD-0CE30F6C56AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3atk-sesf-n64n"><intent_id>914529</intent_id><project_id>817543</project_id><text_data>Filed by H Sam Markham</text_data><comment_date>2018-06-27T00:00:00</comment_date></row><row _id="row-qxsz.b6u5-2gv6" _uuid="00000000-0000-0000-3C94-218A9DCA6FA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qxsz.b6u5-2gv6"><intent_id>636465</intent_id><project_id>737608</project_id><text_data>Blythe Job # 71895^</text_data><comment_date>2014-06-20T00:00:00</comment_date></row><row _id="row-s5xa~v86c-qgc7" _uuid="00000000-0000-0000-BDEA-AAD378A2C13B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s5xa~v86c-qgc7"><intent_id>867849</intent_id><project_id>834606</project_id><text_data>01-JM02-JO</text_data><comment_date>2017-10-09T00:00:00</comment_date></row><row _id="row-k92h-svkx_t9fi" _uuid="00000000-0000-0000-95B3-8E504C4D945D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k92h-svkx_t9fi"><intent_id>486395</intent_id><project_id>676064</project_id><text_data>No Apprentices or subcontractors will be hired for this job.</text_data><comment_date>2011-10-28T00:00:00</comment_date></row><row _id="row-hh9k.77hd-ibtt" _uuid="00000000-0000-0000-55E2-57F45C97F0B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hh9k.77hd-ibtt"><intent_id>509777</intent_id><project_id>686802</project_id><text_data>Equipment &amp; tools:1.	Truck Driver-Driving Truck Mounted Hydro seeder and Skidster2.	Nozzle man-Spraying hydro mulch &amp; Operating Skidster3.	Landscape Laborer: Loading Seed, Fertilizer, Mulch into hand and cleaning.</text_data><comment_date>2012-04-30T00:00:00</comment_date></row><row _id="row-4thd.esqj_gqq5" _uuid="00000000-0000-0000-BF4B-D134D876736B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4thd.esqj_gqq5"><intent_id>497894</intent_id><project_id>662746</project_id><text_data>PHANTOM LAKE ELEMENTARYKENWORTH T800/VACTOR 2115</text_data><comment_date>2012-01-25T00:00:00</comment_date></row><row _id="row-w7kn.v4c2_jjj3" _uuid="00000000-0000-0000-0932-44A18F8C0FD3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w7kn.v4c2_jjj3"><intent_id>975840</intent_id><project_id>880283</project_id><text_data>Install Mulch into landscape beds.</text_data><comment_date>2019-05-04T00:00:00</comment_date></row><row _id="row-f53y~m5fd-ma8k" _uuid="00000000-0000-0000-F228-2657AEB222CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f53y~m5fd-ma8k"><intent_id>1112977</intent_id><project_id>945328</project_id><text_data>1.     weatherization work 2. Y 3. 1 4. residence a.n b. n c. y d.n e. n f. n g. n h. n i. n j. n k. n l. n 5. y 6. y 7. n 8 n</text_data><comment_date>2021-01-04T00:00:00</comment_date></row><row _id="row-3bph_yzh9~kq3f" _uuid="00000000-0000-0000-66A3-30C45FC5EC5B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bph_yzh9~kq3f"><intent_id>522294</intent_id><project_id>691006</project_id><text_data>Form filed by: No name listed</text_data><comment_date>2012-07-13T00:00:00</comment_date></row><row _id="row-zdab-yat6~wa5b" _uuid="00000000-0000-0000-1E1E-1431F5C43036" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdab-yat6~wa5b"><intent_id>707534</intent_id><project_id>763489</project_id><text_data>NOTE: Our employees are Oregon residents and are covered through workers compensation company - SAIF Corporation.  Our policy number is 853047 AR.</text_data><comment_date>2015-07-15T00:00:00</comment_date></row><row _id="row-nh9v.cphp~vujy" _uuid="00000000-0000-0000-BF88-2E185D536567" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nh9v.cphp~vujy"><intent_id>542527</intent_id><project_id>698893</project_id><text_data>Other Truck - 4,000 gallon water truck - used to shuttle non-potable water on jobsite, dust control, filling waterlines for testing, etc</text_data><comment_date>2012-10-31T00:00:00</comment_date></row><row _id="row-j2t7~gz2k.bbx2" _uuid="00000000-0000-0000-6972-F70A64EC3EA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j2t7~gz2k.bbx2"><intent_id>654500</intent_id><project_id>744368</project_id><text_data>Form filed by: Albert Miller</text_data><comment_date>2014-09-15T00:00:00</comment_date></row><row _id="row-jmv6-24wd~iyz6" _uuid="00000000-0000-0000-01A9-B9D74582F4DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jmv6-24wd~iyz6"><intent_id>749524</intent_id><project_id>783947</project_id><text_data>Bobbink 1720 James St 98225We are ontracted for all electrical work. All residences are single family dwellings.</text_data><comment_date>2016-03-02T00:00:00</comment_date></row><row _id="row-d5er-s8g9-mhct" _uuid="00000000-0000-0000-A1DD-748A72C2E9C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d5er-s8g9-mhct"><intent_id>1237767</intent_id><project_id>971028</project_id><text_data>work is already complete, Prevailing wage was paid</text_data><comment_date>2022-06-01T00:00:00</comment_date></row><row _id="row-trve-2tur-3qq9" _uuid="00000000-0000-0000-4076-63084807548F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-trve-2tur-3qq9"><intent_id>792736</intent_id><project_id>803742</project_id><text_data>16-20-8672</text_data><comment_date>2016-09-29T00:00:00</comment_date></row><row _id="row-8uvi-bnqg_7kiz" _uuid="00000000-0000-0000-366E-68BE2400C837" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8uvi-bnqg_7kiz"><intent_id>851141</intent_id><project_id>820343</project_id><text_data>Filed by Ron Sullivan</text_data><comment_date>2017-07-29T00:00:00</comment_date></row><row _id="row-f7ew-jzwd.sp88" _uuid="00000000-0000-0000-3FDF-14103CCE4254" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f7ew-jzwd.sp88"><intent_id>1419079</intent_id><project_id>1120102</project_id><text_data>9925583</text_data><comment_date>2024-04-14T00:00:00</comment_date></row><row _id="row-8fb8.tvbn~d8e9" _uuid="00000000-0000-0000-F644-2DF6511A1B36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8fb8.tvbn~d8e9"><intent_id>855646</intent_id><project_id>828244</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site.</text_data><comment_date>2017-08-17T00:00:00</comment_date></row><row _id="row-ssgk-rpsa_etwx" _uuid="00000000-0000-0000-FC8F-3ECF83A020FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ssgk-rpsa_etwx"><intent_id>631082</intent_id><project_id>735552</project_id><text_data>Several tree removals and pruning</text_data><comment_date>2014-05-22T00:00:00</comment_date></row><row _id="row-xypy.7ef5~junq" _uuid="00000000-0000-0000-5489-CF6361A0A661" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xypy.7ef5~junq"><intent_id>966226</intent_id><project_id>876076</project_id><text_data>1. Repairs to residential structures.2. Yes3. 14. A-No, B-No, C-Yes, D-No, E-No, F-No, G-No, H-No, I-No, J-No, K-No, I-No5. Yes6. Yes7. No 8. No</text_data><comment_date>2019-03-19T00:00:00</comment_date></row><row _id="row-wnek_gxx7.pssk" _uuid="00000000-0000-0000-114F-E3EF82BA8445" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wnek_gxx7.pssk"><intent_id>1317681</intent_id><project_id>1049184</project_id><text_data>General laborer consists of hand work only (no power tools or equipment) $35.23 base + $8.81 pensionCrane Oiler - Driver is being used for an Oil Distributor. Wage band approach is being utilized per Harvey Means $39.97 base + $9.99 pensionBlade Operator is used to grade the project before paving operations $41.48 base + $10.37 pensionOther trucks consists of a 0 to 8000 gallon water truck used to help with compaction and dust control $41.70 base + $10.43 pension</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-3mwv~n4ri_8n92" _uuid="00000000-0000-0000-3D04-BD7F974A91A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3mwv~n4ri_8n92"><intent_id>871289</intent_id><project_id>835980</project_id><text_data>Our work consisted of maintaining lawns, yards and gardens for the Lakehaven properties, to include mowing the grass utilizing a 36&amp;quot; riding lawn mower with a 25 horsepower lawn mower or below, Stilh line trimmers, and Stihl blowers.  We were also responsible for pulling any weeds by hand.  This was the extent of the work that we performed.</text_data><comment_date>2017-10-25T00:00:00</comment_date></row><row _id="row-brkw.3gfw_wfky" _uuid="00000000-0000-0000-114C-1F677B91F609" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brkw.3gfw_wfky"><intent_id>890651</intent_id><project_id>844821</project_id><text_data>#1 - Home maintenance/prevention and repair/rehabilitation services for Tacoma homeowners #2 - Yes#3 - Two Stories (will vary) #4 - a) no b) no c) yes d) no e) no f) no g) no h) no i) no j) no k) no l) no #5 � yes #6 - yes #7 � no #8 - no</text_data><comment_date>2018-03-21T00:00:00</comment_date></row><row _id="row-mfq8_pmsk~xvnw" _uuid="00000000-0000-0000-1B5C-B0EBF8DB76FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mfq8_pmsk~xvnw"><intent_id>605022</intent_id><project_id>724109</project_id><text_data>William,I�m unsure of why as it doesn�t appear you are asking any question, rather responding to the question asked by our processing staff.  The way you will need to respond to the correction notice is with the instructions below.  If you are asking a question or trying to determine something we would need to know what that is to assist.Nathan PeppinFrom: William Junkermier [mailto:wjunkermier@ceriumnetworks.com] Sent: Friday, November 22, 2013 1:43 PMTo: LNI RE Prevailing Wage Worker 1Subject: RE: Correction NoticeNathan:Thank you for the follow-up.  The reason I sent the email is that in speaking with one of your reps, they input the below notes into the system and requested that I follow-up with an email as a verification.Do I need to do anything more?ThanksFrom: Peppin, Nathan B (LNI) [mailto:pepn235@LNI.WA.GOV] On Behalf Of LNI RE Prevailing Wage Worker 1Sent: Friday, November 22, 2013 1:16 PMTo: William JunkermierSubject: RE: Correction NoticeWilliam,If you have not already done so, per the correction notice, please provide any clarification in the Notes section of the form and resubmit the form with those notes through PWIA.  Once you�ve logged into your account you will see a link next to the form �Correction Needed�.  Click that link and open the form.  The Notes section can be found at the bottom of many of the pages as you go through the form.  It is one field that carries over page to page so it does not matter which specific page you include the notes on.Nathan PeppinFrom: William Junkermier [mailto:wjunkermier@ceriumnetworks.com] Sent: Friday, November 22, 2013 10:56 AMTo: LNI RE Prevailing Wage Worker 1Subject: RE: Correction NoticeThis is an existing Avaya system that is having a new release of software applied.  The wiring is in place, no additional telephone wiring is required.  The purpose of two techs is one to program / upgrade system and other is to assist and test.</text_data><comment_date>2013-11-26T00:00:00</comment_date></row><row _id="row-uiht_j84s_mq6z" _uuid="00000000-0000-0000-4086-8F18700D6CF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uiht_j84s_mq6z"><intent_id>952827</intent_id><project_id>870480</project_id><text_data>Filed by Linnie ShaverState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- SMT Desigo CC Migration ProjectPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?Remodel existing building2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No 3.) Does this project entail the remodeling or new construction of a facility?Yes, but not performed by Siemens Employees.4.) If your firm is working upon a type of building system, what type of system is involved? HVAC control system5.)When is your work to be completed? Planning or preconstruction phase or during the public works project? During the projects6.)What specific tasks did your employees perform?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 7.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer8.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none9.) Are you going to be hiring any subcontractors for this project?YesTo expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2018-12-31T00:00:00</comment_date></row><row _id="row-8c2c-57vd.jxgt" _uuid="00000000-0000-0000-ADE9-EAB0E14C7568" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8c2c-57vd.jxgt"><intent_id>811465</intent_id><project_id>811387</project_id><text_data>Kitchen equipment service</text_data><comment_date>2017-01-17T00:00:00</comment_date></row><row _id="row-ibmp-c4z7_sr5a" _uuid="00000000-0000-0000-4B72-DFCDE8D81C94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ibmp-c4z7_sr5a"><intent_id>737052</intent_id><project_id>747103</project_id><text_data>General laborer will be install concrete curb</text_data><comment_date>2015-12-10T00:00:00</comment_date></row><row _id="row-8bci.26ej~jgph" _uuid="00000000-0000-0000-6FCE-34CC9B44958A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8bci.26ej~jgph"><intent_id>756785</intent_id><project_id>788721</project_id><text_data>Truck Drivers are 10 to 12 yard end dump trucks, they haul rock and asphalt for paving and road construction.  Truck and pup drivers haul 20 to 24 yards.  They are also end dump and haul rock and asphalt for highway paving and road construction. Other Truck is 0-8,000 gallon water trucks used for asphalt paving to fill finish rollers on the job.  General laborers manually shovel rock and asphalt at the job sites on highway paving and road construction jobs.  They do not operated machinery or vehicles while shoveling rock and or asphalt.</text_data><comment_date>2016-04-15T00:00:00</comment_date></row><row _id="row-jyuz_ig79.ztet" _uuid="00000000-0000-0000-BBD9-35361616E704" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jyuz_ig79.ztet"><intent_id>895017</intent_id><project_id>838296</project_id><text_data>Deliver and Install plant material  stake treesinstall topsoil</text_data><comment_date>2018-03-27T00:00:00</comment_date></row><row _id="row-f7t8.muw7.4pm2" _uuid="00000000-0000-0000-7352-036C5A76945A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f7t8.muw7.4pm2"><intent_id>907346</intent_id><project_id>822996</project_id><text_data>$30.09 fringe breakdown:$11.49 - local pension$1.51 - national pension$12.44 - H&amp;W$2.57 - Pref Retire H&amp;amp;W$1.45 - Train Trust &amp;amp; $.10 - Train Trust ITF$.20 - PMCA$.07 - Scholarship$.16 - education reimbursement$.10 - labor management fund</text_data><comment_date>2018-05-29T00:00:00</comment_date></row><row _id="row-f9st~brce.bh9p" _uuid="00000000-0000-0000-F088-102DBB2195F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f9st~brce.bh9p"><intent_id>1052915</intent_id><project_id>916460</project_id><text_data>9846844</text_data><comment_date>2020-04-21T00:00:00</comment_date></row><row _id="row-5i2q.7jip_kije" _uuid="00000000-0000-0000-469A-927C435D997A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5i2q.7jip_kije"><intent_id>974827</intent_id><project_id>850064</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR AND WATER TRUCK</text_data><comment_date>2019-04-30T00:00:00</comment_date></row><row _id="row-ww7u-4iiy~mk5x" _uuid="00000000-0000-0000-5F20-0264D62C86B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ww7u-4iiy~mk5x"><intent_id>811149</intent_id><project_id>811246</project_id><text_data>Filed by Zbigniew Komisari.</text_data><comment_date>2017-01-13T00:00:00</comment_date></row><row _id="row-2m57-jvj7.x22t" _uuid="00000000-0000-0000-6505-334A9A677584" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2m57-jvj7.x22t"><intent_id>1262368</intent_id><project_id>1018387</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2022-08-30T00:00:00</comment_date></row><row _id="row-gqge~ze2g~f2xf" _uuid="00000000-0000-0000-FFAA-D44C3BC87253" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqge~ze2g~f2xf"><intent_id>1046198</intent_id><project_id>910462</project_id><text_data>Install topsoil &amp;lt; 2' depth and R&amp;R irrigation system, sod installation.  WIll be using bobcat as well as misc hand tools.</text_data><comment_date>2020-03-18T00:00:00</comment_date></row><row _id="row-a3ns.zp9w~w3tz" _uuid="00000000-0000-0000-B052-12709574B862" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a3ns.zp9w~w3tz"><intent_id>1204116</intent_id><project_id>994862</project_id><text_data>Our customer hired us to supply, deliver, and install bark and/or mulch to a depth of 2 to 4 inches. The laborers assist the truck driver by dragging hoses to the designated installation area and using backpack blowers to guide material into place and for cleanup of material over spray.</text_data><comment_date>2022-01-12T00:00:00</comment_date></row><row _id="row-reic-6x7x~wgj5" _uuid="00000000-0000-0000-20ED-FE1BC1FA644F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-reic-6x7x~wgj5"><intent_id>645474</intent_id><project_id>740914</project_id><text_data>Breakdown of 15.63 fringe is as follows.  $5.40 medical, $9.76 pension, $0.47 training program.</text_data><comment_date>2014-08-13T00:00:00</comment_date></row><row _id="row-dpga.b6vb-fxkf" _uuid="00000000-0000-0000-8BBB-90C9892007FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpga.b6vb-fxkf"><intent_id>983407</intent_id><project_id>882255</project_id><text_data>Truck Driver: Water Tank Truck (0-3000) gallons. Purpose: Dust control.Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2020-01-06T00:00:00</comment_date></row><row _id="row-mptv-yvuq.xjii" _uuid="00000000-0000-0000-98A8-A81419E26BBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mptv-yvuq.xjii"><intent_id>1154364</intent_id><project_id>954445</project_id><text_data>OREGON WORKMANS COMP POLICY WILL COVER OUR WORKERS IN WASHINGTON</text_data><comment_date>2021-06-22T00:00:00</comment_date></row><row _id="row-hh3p.qbfa-afaq" _uuid="00000000-0000-0000-8537-C989D008AE1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hh3p.qbfa-afaq"><intent_id>534298</intent_id><project_id>690206</project_id><text_data>CAD Truck - conveyored Aggregate Delivery system truck. Size - Hold 12yds - It places material into difficult to reach areas.</text_data><comment_date>2012-10-04T00:00:00</comment_date></row><row _id="row-49c7-eizn~tiys" _uuid="00000000-0000-0000-721C-FE6DC68B7073" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49c7-eizn~tiys"><intent_id>533630</intent_id><project_id>694565</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2012-09-11T00:00:00</comment_date></row><row _id="row-dieh.7wtx-sibp" _uuid="00000000-0000-0000-F353-C475349D75B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dieh.7wtx-sibp"><intent_id>1052211</intent_id><project_id>913938</project_id><text_data>Eagle Job #6092PacWest Job #20-020*</text_data><comment_date>2020-04-17T00:00:00</comment_date></row><row _id="row-ey8v_x43q.emf3" _uuid="00000000-0000-0000-78E9-83FF7F809C02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ey8v_x43q.emf3"><intent_id>598066</intent_id><project_id>693837</project_id><text_data>planting plants with shovels and picks and rakes</text_data><comment_date>2013-10-07T00:00:00</comment_date></row><row _id="row-rdcy~yr8b~vtdf" _uuid="00000000-0000-0000-9D6D-3A547F9939A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rdcy~yr8b~vtdf"><intent_id>753594</intent_id><project_id>788235</project_id><text_data>(1)INSULATION, (2)SINGLE FAMILY DWELING (3) 1-2 (4)A-NO B-NO C-YES D-NO E-NO F-NO G-NO H-NO I-NO J-NO K-? (5)YES (6) YES (7) NO (8) NO</text_data><comment_date>2016-03-28T00:00:00</comment_date></row><row _id="row-pttm-why4.4j2g" _uuid="00000000-0000-0000-3FB9-759C5E42986B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pttm-why4.4j2g"><intent_id>1052102</intent_id><project_id>893611</project_id><text_data>Hired by RD Electric I# 1009791 - JCI P#  615786101 WWCC Clarkston Legacy FA  -  PO#  WWCC Clarkston Legacy FA</text_data><comment_date>2020-04-16T00:00:00</comment_date></row><row _id="row-diz2-qrn6_f4fr" _uuid="00000000-0000-0000-B8D2-FF24D5D199A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-diz2-qrn6_f4fr"><intent_id>1160837</intent_id><project_id>970945</project_id><text_data>353450</text_data><comment_date>2021-07-16T00:00:00</comment_date></row><row _id="row-qwef_k4jv-fpgj" _uuid="00000000-0000-0000-F041-3DB879BE92B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qwef_k4jv-fpgj"><intent_id>1181770</intent_id><project_id>981545</project_id><text_data>9877701</text_data><comment_date>2021-09-29T00:00:00</comment_date></row><row _id="row-i5zn_xssz_4rq9" _uuid="00000000-0000-0000-F4E8-5179AFCCDE51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i5zn_xssz_4rq9"><intent_id>969644</intent_id><project_id>876787</project_id><text_data>.  In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions in the notes section at the bottom of this screen: #1 - Describe the work that your firm was contracted to perform. Elevator modernization #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Yes #3 - Including any basement or garage, how many stories or levels does the structure have? 4 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no (b) Any retail use in the structure? no (c) Permanent residence only? (d) Rehabilitation house? no (e) Transitional housing? no (f) Communal dining facility? no (g) Treatment services?no  (h) Assisted living services? no (I) Dormitories? no (j) Counseling? no (k) Is each room and/or bed in the structure rented separately? (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? Yes #6 - Does each dwelling unit have its own bathroom? Yes #7 - Is there a community facility or manager�s office on site? Yes #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2019-04-04T00:00:00</comment_date></row><row _id="row-3uvc-zanh-xhqc" _uuid="00000000-0000-0000-B8ED-C1309140ADC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3uvc-zanh-xhqc"><intent_id>709765</intent_id><project_id>768228</project_id><text_data>Project is to stabilize the banks of the Chehalis River in Lewis County.  Banks will be pulled back to a stable grade, with large engineered log structures placed to deflect river flows from the eroding banks.  Upper graded banks will be hydroseeded and have live willow stakes planted to help stabilize the upper banks from erosion.</text_data><comment_date>2015-07-27T00:00:00</comment_date></row><row _id="row-78np.9zfw~jnpt" _uuid="00000000-0000-0000-05EA-C379E60B9E6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-78np.9zfw~jnpt"><intent_id>752157</intent_id><project_id>787565</project_id><text_data>JOB # 6067 2016 ONLY</text_data><comment_date>2016-03-18T00:00:00</comment_date></row><row _id="row-p9ka~i9qw_xnfp" _uuid="00000000-0000-0000-4F26-1916449C8F0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p9ka~i9qw_xnfp"><intent_id>632180</intent_id><project_id>735964</project_id><text_data>LABORERS:  $10.71H &amp; W   = $5.70Pension = $4.50Training= $0.45Trust     = $0.06OPERATORS:  $12.85H &amp; W   = $5.55Pension = $6.75Training= $0.55TEAMSTERS:  $15.19H &amp; W   = $9.14Pension = $5.80Training= $0.25</text_data><comment_date>2014-05-29T00:00:00</comment_date></row><row _id="row-tvw8-fb4m~4z3j" _uuid="00000000-0000-0000-935D-EC9F1568CC1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tvw8-fb4m~4z3j"><intent_id>1041252</intent_id><project_id>902620</project_id><text_data>All electrical work will be done in single family residence. None will have commercial use or will have any use other than a single family residence</text_data><comment_date>2020-02-26T00:00:00</comment_date></row><row _id="row-a3c4-sqmm~i4iq" _uuid="00000000-0000-0000-AA50-9A2E016D57F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a3c4-sqmm~i4iq"><intent_id>933251</intent_id><project_id>841408</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2018-09-17T00:00:00</comment_date></row><row _id="row-am43~w8v7-4bxw" _uuid="00000000-0000-0000-1D14-96883E6E9D1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-am43~w8v7-4bxw"><intent_id>503126</intent_id><project_id>683864</project_id><text_data>HIF# 12157405, 12157448, 12157471, 12157501, 12157530, 12157532, 12157548, 12157614, 12157715, 12157752, 12157755, 12157773, 12157775, 12161425, 12161443, 12161451, 12161603, 12161613, 12161751, 12161753, 12161796, 12161798, 12166283, 12166289, 12166403</text_data><comment_date>2012-03-08T00:00:00</comment_date></row><row _id="row-3vbt-am3f.bmib" _uuid="00000000-0000-0000-85A3-2798B812CE27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vbt-am3f.bmib"><intent_id>681903</intent_id><project_id>759875</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2015-04-16T00:00:00</comment_date></row><row _id="row-nwnu.fk2n_dr3d" _uuid="00000000-0000-0000-1D0B-13F3DF2A474C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nwnu.fk2n_dr3d"><intent_id>653936</intent_id><project_id>735650</project_id><text_data>PPC 14463</text_data><comment_date>2014-09-11T00:00:00</comment_date></row><row _id="row-q87h.k6si.aeew" _uuid="00000000-0000-0000-17BF-A8C4A5F1D3E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q87h.k6si.aeew"><intent_id>612579</intent_id><project_id>727572</project_id><text_data>#1 panel change,#2yes,#2no,#4no,#5yes,#6yes,#7no</text_data><comment_date>2014-01-16T00:00:00</comment_date></row><row _id="row-up32_t9i4_qvhb" _uuid="00000000-0000-0000-EF8F-2314F522D027" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-up32_t9i4_qvhb"><intent_id>709248</intent_id><project_id>762417</project_id><text_data>Laborers will be setting jacks and stacking cribs to lift the cooler while the GC repairs flashing.  After repairs are made, general laborers will be removing the crib and jacks.</text_data><comment_date>2015-07-22T00:00:00</comment_date></row><row _id="row-9nu7-g8q2~na56" _uuid="00000000-0000-0000-4721-7291A4861385" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9nu7-g8q2~na56"><intent_id>1142971</intent_id><project_id>961465</project_id><text_data>KG1762</text_data><comment_date>2021-05-07T00:00:00</comment_date></row><row _id="row-6ei3~y7gr-dnum" _uuid="00000000-0000-0000-D1B5-989F6B1F4DF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ei3~y7gr-dnum"><intent_id>1215739</intent_id><project_id>1002265</project_id><text_data>INV # 88547874 SR # 51680888</text_data><comment_date>2022-03-04T00:00:00</comment_date></row><row _id="row-73ft.kpaf-tydr" _uuid="00000000-0000-0000-7965-62EB7A4CFD81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73ft.kpaf-tydr"><intent_id>567943</intent_id><project_id>710304</project_id><text_data>Install Fertile Mulch into landscaped areas.</text_data><comment_date>2013-05-05T00:00:00</comment_date></row><row _id="row-vfec_qh9d_8m2q" _uuid="00000000-0000-0000-37F6-AC7C96A38BB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfec_qh9d_8m2q"><intent_id>604654</intent_id><project_id>682143</project_id><text_data>Electricians � Inside:Health: $7.45Pension: $9.34Training: $0.58Total: $17.37</text_data><comment_date>2013-11-14T00:00:00</comment_date></row><row _id="row-wane~vudt.rxip" _uuid="00000000-0000-0000-FA5D-516D3643C8CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wane~vudt.rxip"><intent_id>1036029</intent_id><project_id>887556</project_id><text_data>Holroyd Company, Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; andHolroyd Company, Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2020-02-04T00:00:00</comment_date></row><row _id="row-x26p-7xf7-armh" _uuid="00000000-0000-0000-47E0-067D3F579368" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x26p-7xf7-armh"><intent_id>1141930</intent_id><project_id>960864</project_id><text_data>Truck Drivers Dump Truck:  The Dump truck will be hauling gravel and is a 10 yard truck</text_data><comment_date>2021-05-04T00:00:00</comment_date></row><row _id="row-avpe~cxya~ygdz" _uuid="00000000-0000-0000-4125-3E18D298E1F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-avpe~cxya~ygdz"><intent_id>1465545</intent_id><project_id>1139619</project_id><text_data>#1. Take out insulation#2. Single family dwelling#3. 1 story#4.(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j) no(k) no(l) no.#5. no#6. no#7. no#8. no</text_data><comment_date>2024-09-20T00:00:00</comment_date></row><row _id="row-sgqp_8kr8-q3du" _uuid="00000000-0000-0000-E0BF-9C71024496CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sgqp_8kr8-q3du"><intent_id>829177</intent_id><project_id>819167</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install horizontal cable for voice / data communications. Terminate cables in the equipment room.</text_data><comment_date>2017-04-26T00:00:00</comment_date></row><row _id="row-37q2_sqcp~szs4" _uuid="00000000-0000-0000-2279-23E8F34EC8C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-37q2_sqcp~szs4"><intent_id>1025119</intent_id><project_id>888028</project_id><text_data>Irrigation repairs and backfill at Sign</text_data><comment_date>2019-12-04T00:00:00</comment_date></row><row _id="row-en3c.mmi4-bpxj" _uuid="00000000-0000-0000-D90E-E02CA8091CCC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-en3c.mmi4-bpxj"><intent_id>527390</intent_id><project_id>693462</project_id><text_data>Job # 172188</text_data><comment_date>2012-08-09T00:00:00</comment_date></row><row _id="row-fmf6~sxnz_ziar" _uuid="00000000-0000-0000-7642-172F8C7051ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fmf6~sxnz_ziar"><intent_id>869769</intent_id><project_id>835377</project_id><text_data>Filed by Francisco Flores</text_data><comment_date>2017-10-18T00:00:00</comment_date></row><row _id="row-ik6q.xasr-zx6d" _uuid="00000000-0000-0000-C5C9-131CDF446436" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ik6q.xasr-zx6d"><intent_id>697399</intent_id><project_id>763503</project_id><text_data>This is a JOC Contract.  Saybr Contractors Inc. is the Prime.  Contract #2014-03G</text_data><comment_date>2015-07-31T00:00:00</comment_date></row><row _id="row-8y86~ypmr_mztq" _uuid="00000000-0000-0000-13DB-710005D805AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8y86~ypmr_mztq"><intent_id>541072</intent_id><project_id>686926</project_id><text_data>veebees</text_data><comment_date>2012-10-22T00:00:00</comment_date></row><row _id="row-tash.uewy_wmqy" _uuid="00000000-0000-0000-A7BF-B34AF86AF1C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tash.uewy_wmqy"><intent_id>800907</intent_id><project_id>807003</project_id><text_data>Filed by Mark Roulst.</text_data><comment_date>2016-11-10T00:00:00</comment_date></row><row _id="row-dc78-9zcs.av7n" _uuid="00000000-0000-0000-711F-109B08D4D279" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dc78-9zcs.av7n"><intent_id>726622</intent_id><project_id>768625</project_id><text_data>We are tribally insured and therefore do not have a Washington Industrial ID Number.</text_data><comment_date>2015-10-15T00:00:00</comment_date></row><row _id="row-95ah~mipx.hq7k" _uuid="00000000-0000-0000-3BAD-00FE1C69E394" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-95ah~mipx.hq7k"><intent_id>706248</intent_id><project_id>766935</project_id><text_data>Carpenter Fringes:  $7.44 Health, $6.56 Retirement, $.84 ApprenticeCabinet Maker Fringes:  $2.17 Health</text_data><comment_date>2015-07-09T00:00:00</comment_date></row><row _id="row-vnzh.rzpk.euzj" _uuid="00000000-0000-0000-B08F-74D2AB062477" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vnzh.rzpk.euzj"><intent_id>921675</intent_id><project_id>857225</project_id><text_data>Install 52 cat6 data drops inside Omak school districts North and East Elementary schools and in the new modular building.</text_data><comment_date>2018-07-30T00:00:00</comment_date></row><row _id="row-bs5i-6ihw~8yf3" _uuid="00000000-0000-0000-1238-FA34447A8497" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bs5i-6ihw~8yf3"><intent_id>959188</intent_id><project_id>872705</project_id><text_data>Filed by Deborah Johnson</text_data><comment_date>2019-02-06T00:00:00</comment_date></row><row _id="row-a5k3-ppa7.khj6" _uuid="00000000-0000-0000-8601-2952EBE7E667" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5k3-ppa7.khj6"><intent_id>816646</intent_id><project_id>790020</project_id><text_data>WO 1925</text_data><comment_date>2017-02-17T00:00:00</comment_date></row><row _id="row-bmks~reug~vqe2" _uuid="00000000-0000-0000-72C9-182D24518689" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmks~reug~vqe2"><intent_id>800277</intent_id><project_id>765776</project_id><text_data>Filed by Nariman YusupovThis project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2016-11-08T00:00:00</comment_date></row><row _id="row-fyw4.tciq~q2ac" _uuid="00000000-0000-0000-7D0D-20909E6AFAD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fyw4.tciq~q2ac"><intent_id>517119</intent_id><project_id>689702</project_id><text_data>HIF# 12869768</text_data><comment_date>2012-06-15T00:00:00</comment_date></row><row _id="row-z6rf~wifk~gn4b" _uuid="00000000-0000-0000-E662-0AA37A13139C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z6rf~wifk~gn4b"><intent_id>781031</intent_id><project_id>799261</project_id><text_data>Bertoglio is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The electrician will be installing a new bathroom fan and wall mount fixture. This job meets the residential job requirements.</text_data><comment_date>2016-08-09T00:00:00</comment_date></row><row _id="row-ms4h_kk4x_8fur" _uuid="00000000-0000-0000-5197-95E268424ABB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ms4h_kk4x_8fur"><intent_id>598748</intent_id><project_id>714323</project_id><text_data>Hydroseed lawn areas.  Hydroseeding for beautification only.</text_data><comment_date>2013-10-10T00:00:00</comment_date></row><row _id="row-apg5~sexg.8cum" _uuid="00000000-0000-0000-16CE-C0E13FE00435" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-apg5~sexg.8cum"><intent_id>848943</intent_id><project_id>742172</project_id><text_data>Install fresh fir barkdust into landscaped areas utilizing specialized blower trucks and hand labor.</text_data><comment_date>2017-07-20T00:00:00</comment_date></row><row _id="row-bkm8_su23_qf4q" _uuid="00000000-0000-0000-6094-E5620E4F9FF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bkm8_su23_qf4q"><intent_id>1088541</intent_id><project_id>932858</project_id><comment_date>2020-09-16T00:00:00</comment_date></row><row _id="row-prrm.n57c_3xpi" _uuid="00000000-0000-0000-83EF-26EA39D8BC28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prrm.n57c_3xpi"><intent_id>748151</intent_id><project_id>785757</project_id><text_data>Work will be done indoors</text_data><comment_date>2016-02-23T00:00:00</comment_date></row><row _id="row-qegm~y7yw~52s7" _uuid="00000000-0000-0000-CC17-904C914FA099" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qegm~y7yw~52s7"><intent_id>807901</intent_id><project_id>809686</project_id><text_data>We do not have a contract number.  We are getting paperwork in order with the school district at which time they will issue a contract.</text_data><comment_date>2016-12-20T00:00:00</comment_date></row><row _id="row-32kw.8utz-8f6m" _uuid="00000000-0000-0000-A2AA-E6AFCF3625BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-32kw.8utz-8f6m"><intent_id>481383</intent_id><project_id>669085</project_id><text_data>General Project consisted of sitework &amp; relacation of classroom portables; All work performed by others we furnished &amp; installed hydroseed on areas prepared by others; no other workwas performed by us.</text_data><comment_date>2011-11-08T00:00:00</comment_date></row><row _id="row-em62~455h.f26p" _uuid="00000000-0000-0000-7179-63F0FAABD048" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-em62~455h.f26p"><intent_id>689272</intent_id><project_id>757388</project_id><text_data>Form filed by: Billy Johnson</text_data><comment_date>2015-04-15T00:00:00</comment_date></row><row _id="row-g6ng~9xtn.68hc" _uuid="00000000-0000-0000-9A72-7E2A3E7DDD80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g6ng~9xtn.68hc"><intent_id>547610</intent_id><project_id>693494</project_id><text_data>this is a refrigeration job, and trade has been modified.</text_data><comment_date>2012-12-19T00:00:00</comment_date></row><row _id="row-4nfc~w6kg~kh3x" _uuid="00000000-0000-0000-D66A-4663DA6D514B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4nfc~w6kg~kh3x"><intent_id>1273922</intent_id><project_id>1000521</project_id><text_data>#1 - Remove and Reinstall windows/doors for Noise Remediation. #2 Duplex #3 - Three #4 - A&amp;B � No C-Yes D-K- No# 5-7 Yes # 8 - No</text_data><comment_date>2022-10-11T00:00:00</comment_date></row><row _id="row-wdte_iknk_ep8q" _uuid="00000000-0000-0000-9D5F-08190C5305BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wdte_iknk_ep8q"><intent_id>737298</intent_id><project_id>755589</project_id><text_data>Filed by Kenneth Rustia</text_data><comment_date>2015-12-11T00:00:00</comment_date></row><row _id="row-cy5p_duds_vu4a" _uuid="00000000-0000-0000-AC2C-1F838EAC08EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cy5p_duds_vu4a"><intent_id>1131594</intent_id><project_id>955781</project_id><comment_date>2021-03-25T00:00:00</comment_date></row><row _id="row-c7e5~38vs-pzm8" _uuid="00000000-0000-0000-0679-706A4BD1B69F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c7e5~38vs-pzm8"><intent_id>1167984</intent_id><project_id>973701</project_id><text_data>Emergency Job, after hours - time and half for laborer.</text_data><comment_date>2021-08-10T00:00:00</comment_date></row><row _id="row-peuz-78z3~u9qw" _uuid="00000000-0000-0000-9132-71F4C96559DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-peuz-78z3~u9qw"><intent_id>502300</intent_id><project_id>683527</project_id><text_data>Sent e-mail: Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor). To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out). In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures. Please note that an on-call/blanket/annual contract may not be utilized for construction projects or for warranty work as these require their own set of Intent and forms with the appropriate bid and award dates associated with those specific contracts. The use of on-call/blanket/annual contracts is limited to maintenance and repair work. If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work.On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out. (RCW 39.12.040)We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp(chrr235)</text_data><comment_date>2012-03-01T00:00:00</comment_date></row><row _id="row-ep98.f6hf.asxf" _uuid="00000000-0000-0000-E074-624ECA5AE52C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ep98.f6hf.asxf"><intent_id>1211722</intent_id><project_id>995805</project_id><text_data>Job #2201SC Truck Driver 'Other' used for truck mounted pick up sweeper and/or 2000-4000 gallon water truck</text_data><comment_date>2022-02-15T00:00:00</comment_date></row><row _id="row-5e4q-je2j-4hj6" _uuid="00000000-0000-0000-63DD-CC5321396070" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5e4q-je2j-4hj6"><intent_id>1143057</intent_id><project_id>961520</project_id><text_data>The project extended through July 13th 2021 per Callie Johnson.</text_data><comment_date>2021-08-16T00:00:00</comment_date></row><row _id="row-qjft_c9z2_68x8" _uuid="00000000-0000-0000-E34D-4D881E8E2BD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qjft_c9z2_68x8"><intent_id>451646</intent_id><project_id>664344</project_id><text_data>Erin Roblin, 8506 Thuja Ave SE, Yelm, WA 98597Dale Trefry, 1508 Meadow Ln, Centralia, WA 98531Brandy Cruz-Pedro, 1325 88th Ave SE, Olympia, WA 98501Sarah Smith, 930 Trosper Rd SW #29, Tumwater, WA 98512</text_data><comment_date>2011-08-09T00:00:00</comment_date></row><row _id="row-bnkg-rxjr.juzr" _uuid="00000000-0000-0000-9F32-1E0E87BA62BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bnkg-rxjr.juzr"><intent_id>723137</intent_id><project_id>771216</project_id><text_data>Fringe Breakdown:$9.82---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $2.82 Pension$18.63--$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $11.63 Pension</text_data><comment_date>2015-09-28T00:00:00</comment_date></row><row _id="row-usfh-erx5~83wt" _uuid="00000000-0000-0000-26F0-281D83D05941" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-usfh-erx5~83wt"><intent_id>674730</intent_id><project_id>753648</project_id><text_data>To Improve existing gutter to best prevent water overflow dripping.Install new sheetmetal clip on flashing and seal to existing EPDM membrane interior gutter using EPDM seam tape.Thoroughly clean existing EPDM surface prior to tape installation.  Tools and materials: ladders, 2&amp;quot; rubber rollers, rags, soap,water, one work truck.</text_data><comment_date>2015-01-23T00:00:00</comment_date></row><row _id="row-qx8z~9khk-bwyf" _uuid="00000000-0000-0000-F259-BCBB9B1FD3FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qx8z~9khk-bwyf"><intent_id>714471</intent_id><project_id>769968</project_id><text_data>Debris clean up; Tools used: shovels &amp; rakes.</text_data><comment_date>2015-08-14T00:00:00</comment_date></row><row _id="row-efb7-ffjr-hv6y" _uuid="00000000-0000-0000-A5D1-D64C9D37D81D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efb7-ffjr-hv6y"><intent_id>833432</intent_id><project_id>820910</project_id><text_data>Thurston County Public Works - Emergency Cottonwood Removal5101 SE Rehklau RoadEstimate #17130 - Invoice #</text_data><comment_date>2017-05-16T00:00:00</comment_date></row><row _id="row-7iru-38wr_xxwv" _uuid="00000000-0000-0000-07DF-8DDA7C69A3ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7iru-38wr_xxwv"><intent_id>1222532</intent_id><project_id>940195</project_id><text_data>The trucks are tractors pulling belly dumps hauling more than 20 yards of rock</text_data><comment_date>2022-04-21T00:00:00</comment_date></row><row _id="row-pzgn~t5sk.49uk" _uuid="00000000-0000-0000-C0CD-E768CCBBAE40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pzgn~t5sk.49uk"><intent_id>992300</intent_id><project_id>887386</project_id><text_data>General Laborer: hand shovel</text_data><comment_date>2019-07-16T00:00:00</comment_date></row><row _id="row-yanb_wavh_vm26" _uuid="00000000-0000-0000-E31E-452C98959A94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yanb_wavh_vm26"><intent_id>925742</intent_id><project_id>855546</project_id><text_data>Other Truck - Water TruckOther Truck - Lowboy/lowbed heavy duty trailer</text_data><comment_date>2018-08-15T00:00:00</comment_date></row><row _id="row-294c_myqm-eguf" _uuid="00000000-0000-0000-6A0F-DFD9828AD527" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-294c_myqm-eguf"><intent_id>684312</intent_id><project_id>757074</project_id><text_data>1) Installed circuit for ductless heat 2) Single family residence3) Single level4) Permanent residence only5) Yes6) Yes7) No8) No</text_data><comment_date>2015-03-18T00:00:00</comment_date></row><row _id="row-xpt4_yz7v-z4ka" _uuid="00000000-0000-0000-AE2D-9A6F5BC9DA94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xpt4_yz7v-z4ka"><intent_id>1134459</intent_id><project_id>957414</project_id><text_data>9862336</text_data><comment_date>2021-04-07T00:00:00</comment_date></row><row _id="row-txt4-9raf-wrku" _uuid="00000000-0000-0000-A5BE-64E51765DFE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-txt4-9raf-wrku"><intent_id>662304</intent_id><project_id>742456</project_id><text_data>Filed by Theresa England.</text_data><comment_date>2014-10-24T00:00:00</comment_date></row><row _id="row-iegd.d5ai.iwd4" _uuid="00000000-0000-0000-5A1A-3F2B219F3989" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iegd.d5ai.iwd4"><intent_id>1087724</intent_id><project_id>929587</project_id><text_data>Other Truck = Water Truck</text_data><comment_date>2020-09-19T00:00:00</comment_date></row><row _id="row-pcfp_267f_uj8a" _uuid="00000000-0000-0000-548B-E01BBBE36393" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pcfp_267f_uj8a"><intent_id>1251052</intent_id><project_id>1022934</project_id><text_data>Asotin County Building Permit #18237</text_data><comment_date>2022-07-21T00:00:00</comment_date></row><row _id="row-znm9_t9kj_76mx" _uuid="00000000-0000-0000-F620-10D4FDDCA36A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-znm9_t9kj_76mx"><intent_id>808441</intent_id><project_id>794356</project_id><text_data>1160083</text_data><comment_date>2016-12-22T00:00:00</comment_date></row><row _id="row-rifk_rkg7-r2mp" _uuid="00000000-0000-0000-45B6-8A678FAF36FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rifk_rkg7-r2mp"><intent_id>627564</intent_id><project_id>699258</project_id><text_data>Other Trucks - street sweeper</text_data><comment_date>2014-05-01T00:00:00</comment_date></row><row _id="row-3gct-cbty~bnap" _uuid="00000000-0000-0000-51BB-B650F9BE1476" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gct-cbty~bnap"><intent_id>948156</intent_id><project_id>853173</project_id><text_data>This project is exempt from the payment of state prevailing wage rates based on the Housing Act of 1937 and 24 CFR 965.101. We will pay the workers properly in accordance with Davis Bacon wage requirements1- Insulation - Subcontractor2- Apartments3- 3 Stories4 (a) Yes4 (b) No4 (c) Yes4 (d) No4 (e) No4 (f) No4 (g) No4 (h) No4 (i) No4 (j) No4 (k) No4 (l) No5- Yes6- Yes7- Yes8- No</text_data><comment_date>2018-11-29T00:00:00</comment_date></row><row _id="row-rr3k~e4fd_7g66" _uuid="00000000-0000-0000-C2E8-4874EF21ECA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rr3k~e4fd_7g66"><intent_id>1291716</intent_id><project_id>1046005</project_id><text_data>231116102: LOW TEMP CHEMICAL WAREWASHER 12/16 Tech 64. Sanitizer not feeding. Replaced chemical pump tubing. Sanitizer tube was looking old and brittle so it was replaced from locally sourced materials. Primed chemicals and let staff know they are out of detergent</text_data><comment_date>2022-12-22T00:00:00</comment_date></row><row _id="row-kb2z_fd2q~vkjx" _uuid="00000000-0000-0000-67A1-86EC70C3B176" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kb2z_fd2q~vkjx"><intent_id>707857</intent_id><project_id>761710</project_id><text_data>K &amp; T reportSign off Attic/ Walls/ Crawl.Repair open boxes:  Attic &amp; Crawl.Replace 2 fans with timersSingle residential home.</text_data><comment_date>2015-07-16T00:00:00</comment_date></row><row _id="row-kt4r.xxgh_8h9t" _uuid="00000000-0000-0000-FCEC-BF4FF5620F83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kt4r.xxgh_8h9t"><intent_id>1221814</intent_id><project_id>1006130</project_id><text_data>Blythe WO220516</text_data><comment_date>2022-03-30T00:00:00</comment_date></row><row _id="row-uaxu.5eca-7wsc" _uuid="00000000-0000-0000-2547-F1F34507DBDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uaxu.5eca-7wsc"><intent_id>826500</intent_id><project_id>814569</project_id><text_data>PN # 32073 SEA</text_data><comment_date>2017-04-13T00:00:00</comment_date></row><row _id="row-kuud-kzkz~4qes" _uuid="00000000-0000-0000-120A-339D330DFFE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kuud-kzkz~4qes"><intent_id>751269</intent_id><project_id>786285</project_id><text_data>1.Leak in crawl space, toilet base adjustment 2. Single family dwelling 3. a - no, b - no, c - yes, d - no, e - no, f - no, g - no, h - no i - no, j - no,  #5, yes, #6, yes, #7, no, #8, no</text_data><comment_date>2016-03-14T00:00:00</comment_date></row><row _id="row-ff6v_8wtp-wm6m" _uuid="00000000-0000-0000-FDF6-39F36EDC996E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ff6v_8wtp-wm6m"><intent_id>743144</intent_id><project_id>766299</project_id><text_data>302039</text_data><comment_date>2016-01-22T00:00:00</comment_date></row><row _id="row-mhwi-srmt.ziju" _uuid="00000000-0000-0000-06D0-074A83801ED1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mhwi-srmt.ziju"><intent_id>559207</intent_id><project_id>706417</project_id><text_data>TGLC is hiring a sub (TruGreen-ChemLawn) to complete all work; dormant oil application for deciduous trees.</text_data><comment_date>2013-03-08T00:00:00</comment_date></row><row _id="row-myck.ugab_rbti" _uuid="00000000-0000-0000-186C-2AB9BCB9E829" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-myck.ugab_rbti"><intent_id>1010306</intent_id><project_id>894503</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT, IT IS A SINGLE FAMILY RESIDENTIAL DWELLING.</text_data><comment_date>2019-09-26T00:00:00</comment_date></row><row _id="row-hzhi_i64u.cftb" _uuid="00000000-0000-0000-7259-70F4266E289A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hzhi_i64u.cftb"><intent_id>601549</intent_id><project_id>711957</project_id><text_data>LEI#262913</text_data><comment_date>2013-10-25T00:00:00</comment_date></row><row _id="row-fhqa_tf4i_55hm" _uuid="00000000-0000-0000-252E-9279C1CAA0B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fhqa_tf4i_55hm"><intent_id>882775</intent_id><project_id>841174</project_id><text_data>7x24 Battery Replacement: PN 153700004-002: PWHR12540W4FR VRLA Sealed (40)</text_data><comment_date>2018-01-10T00:00:00</comment_date></row><row _id="row-gcc8.24zb_hk98" _uuid="00000000-0000-0000-C5B6-E10929EF82BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcc8.24zb_hk98"><intent_id>1087904</intent_id><project_id>932557</project_id><text_data>Dispatched to water cleanup on 7/22/20 that occurred due to a boiler pipe leak. Arrived onsite and assessed the situation. Set up 10 dehumidifiers, 46 air movers and 5 Injecti dry units. Sprayed antimicrobial and monitored moisture levels. Tools used: hammer, pry bar, containment, debris bags and moisture meter.</text_data><comment_date>2020-09-14T00:00:00</comment_date></row><row _id="row-sx6n~qedd~uqzr" _uuid="00000000-0000-0000-836D-849E8467D765" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sx6n~qedd~uqzr"><intent_id>1062707</intent_id><project_id>915904</project_id><text_data>Labor and materials for installation of low voltage telecommunications cabling installed inside a new Elementary School for the purpose of networking personal computers.</text_data><comment_date>2020-06-04T00:00:00</comment_date></row><row _id="row-xd3n-jfnc~vxdr" _uuid="00000000-0000-0000-0116-CAB1ECE86C44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xd3n-jfnc~vxdr"><intent_id>806316</intent_id><project_id>808983</project_id><text_data>#1 Replace bath fan/light, Wall heaters attic J-boxes &amp; hot water tank replacement . #2 Single family dwelling stick frame. #3 2 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2016-12-09T00:00:00</comment_date></row><row _id="row-ihj9~8gjy.rskw" _uuid="00000000-0000-0000-DF9C-93B476A61359" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihj9~8gjy.rskw"><intent_id>1039583</intent_id><project_id>887836</project_id><text_data>Other  Truck = Semi for Delivery</text_data><comment_date>2020-02-19T00:00:00</comment_date></row><row _id="row-xqd2_jxg5~s4te" _uuid="00000000-0000-0000-59B5-2C846F5BCA5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xqd2_jxg5~s4te"><intent_id>775555</intent_id><project_id>797238</project_id><text_data>MD Marine Electric is a company that provides any and all electrical needs necessary. This work includes but is not limited to installing new systems, retrofitting old systems, repairing systems, trouble shooting, alarm checks, thermal imaging, running and connecting fiber optical cable, and generator maintenance.</text_data><comment_date>2016-07-19T00:00:00</comment_date></row><row _id="row-gt95-wr89_ki59" _uuid="00000000-0000-0000-DE79-9E8BF9AD9661" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gt95-wr89_ki59"><intent_id>855023</intent_id><project_id>830033</project_id><text_data>Entire project consists of landscape maintenance including, mowing, edging, trimming, hardsurface blowing, trash pick up, leaf collection, pruning, weed control.  Equipment used are 1/2 ton pick up truck, landscape trailer, walk-behind mower, line trimmer, leaf blower, misc. hand tools such as pruners, rake, shovel, etc.</text_data><comment_date>2017-08-15T00:00:00</comment_date></row><row _id="row-p66d~26mf_6i6k" _uuid="00000000-0000-0000-1F6C-2B7488A40BAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p66d~26mf_6i6k"><intent_id>891398</intent_id><project_id>842457</project_id><text_data>#1 Drywall- install &amp; finish#2 single famil#3 3#4 residential housinga)nob) noc)yesd)noe)yesf)nog0noh)noi)noj) I don&amp;#39;t know it is a transitional housing for victims of domestic violence &amp; sexual assaultk) beds are not rented, but provided#5 no#6 no#7 I don&amp;#39;t know -General contractor has an approved intent#8 no</text_data><comment_date>2018-03-06T00:00:00</comment_date></row><row _id="row-ctpm-ymfy.yxu7" _uuid="00000000-0000-0000-09A6-464E08E32DB0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ctpm-ymfy.yxu7"><intent_id>672109</intent_id><project_id>744681</project_id><text_data>Filed by Luis Ibarra</text_data><comment_date>2015-01-05T00:00:00</comment_date></row><row _id="row-m6yk~ymjr-sgs7" _uuid="00000000-0000-0000-2C7A-3C6FD41A63E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6yk~ymjr-sgs7"><intent_id>1210306</intent_id><project_id>998822</project_id><text_data>PTL SO 162392, this Intent replace Intent  # 1166067 under Pumptech INC, Pumptech LLC is the new company name with new UBI number</text_data><comment_date>2022-02-09T00:00:00</comment_date></row><row _id="row-ix59.x53g_nbqq" _uuid="00000000-0000-0000-26AB-9F9BE59B4738" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ix59.x53g_nbqq"><intent_id>960847</intent_id><project_id>849886</project_id><text_data>To replace Intent #906693 as ownership changed from sole proprietor to LLC.</text_data><comment_date>2019-02-19T00:00:00</comment_date></row><row _id="row-brgt.4n94.hcm5" _uuid="00000000-0000-0000-2399-2D44C4550577" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brgt.4n94.hcm5"><intent_id>669253</intent_id><project_id>750481</project_id><text_data>We will be performing fall leaf pickup, weed control both chemically and manually, pruning trees and shrubs, picking up litter, leaves, and debris, fertilizing shrubs and lawn, mowing and edging lawn, utilizing leaf blowers, adjusting irrigation system as needed.</text_data><comment_date>2014-12-10T00:00:00</comment_date></row><row _id="row-qtw9-uxmy.vnv2" _uuid="00000000-0000-0000-6320-1461BC095FAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qtw9-uxmy.vnv2"><intent_id>581900</intent_id><project_id>708098</project_id><text_data>Sheet Metal - Pension = 12.02, H&amp;W = 10.07, Training = 1.97, Clean Card (other) = .02</text_data><comment_date>2013-07-18T00:00:00</comment_date></row><row _id="row-vpj6-8itp~pxwq" _uuid="00000000-0000-0000-D643-EA3F178DF537" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vpj6-8itp~pxwq"><intent_id>604902</intent_id><project_id>720717</project_id><text_data>WE WILL BE PROVIDING LABOR AND MATERIALS AS A SUBCONTRACTOR, FOR LIGHTING AND CONTROLS FOR NEW STANDPIPE RESERVOIR</text_data><comment_date>2013-11-17T00:00:00</comment_date></row><row _id="row-fjyp_nq7z.h5v4" _uuid="00000000-0000-0000-6CA2-596C389AF054" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fjyp_nq7z.h5v4"><intent_id>620022</intent_id><project_id>714422</project_id><text_data>Form filed by: Ivan Cam</text_data><comment_date>2014-03-13T00:00:00</comment_date></row><row _id="row-eavn.hvri.hh63" _uuid="00000000-0000-0000-2E27-4969C7F34EB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eavn.hvri.hh63"><intent_id>1201639</intent_id><project_id>977691</project_id><text_data>Irrigation, topsoil, compost installation, bark mulch, alum edging, plantings; Tools include misc hand tools, bob cat skid steer</text_data><comment_date>2021-12-28T00:00:00</comment_date></row><row _id="row-x349.6hnc_pf9u" _uuid="00000000-0000-0000-869D-F98252E05CA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x349.6hnc_pf9u"><intent_id>725555</intent_id><project_id>774351</project_id><text_data>Pumped 3500 gallons from manhole, it was full to about 3&amp;quot; below the top. As I pumped down the man hole, the two inlet lines from the apartment buildings cleared and emptied into the manhole as I was pumping.</text_data><comment_date>2015-10-09T00:00:00</comment_date></row><row _id="row-ckd3_t5n9~uqmy" _uuid="00000000-0000-0000-BAD4-36B2A0BB02A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ckd3_t5n9~uqmy"><intent_id>1064140</intent_id><project_id>918954</project_id><text_data>We do not know the entire scope of this project as we are only performing the erosion control portion. Our laborers use hand tools like picks, shovels, and post pounders to install temporary erosion and sediment control products.</text_data><comment_date>2020-06-10T00:00:00</comment_date></row><row _id="row-mn5s-upjc.p7vt" _uuid="00000000-0000-0000-E386-B1C2E8C8706F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mn5s-upjc.p7vt"><intent_id>901685</intent_id><project_id>849584</project_id><text_data>other trucks included are water trucks for dust control</text_data><comment_date>2018-04-30T00:00:00</comment_date></row><row _id="row-377w_k7k3_5qyv" _uuid="00000000-0000-0000-B7F9-0BADE3DC1C9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-377w_k7k3_5qyv"><intent_id>498025</intent_id><project_id>681819</project_id><text_data>Fom filed by: Susana Candayre</text_data><comment_date>2012-02-13T00:00:00</comment_date></row><row _id="row-b9b4.rnvj.m93c" _uuid="00000000-0000-0000-A927-9F1B09E14524" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9b4.rnvj.m93c"><intent_id>1063586</intent_id><project_id>903726</project_id><text_data>INTENT 301SNJ0606</text_data><comment_date>2020-06-09T00:00:00</comment_date></row><row _id="row-ecuw~67ue~rheg" _uuid="00000000-0000-0000-7E0E-6FCFD79EB049" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ecuw~67ue~rheg"><intent_id>1057831</intent_id><project_id>918892</project_id><text_data>Inside workElect tech(06)conference room drops for Adams Building</text_data><comment_date>2020-05-13T00:00:00</comment_date></row><row _id="row-q5wa-rur9_8csa" _uuid="00000000-0000-0000-35EA-A86F264AFC26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5wa-rur9_8csa"><intent_id>672850</intent_id><project_id>752217</project_id><text_data>Install (8) 6&amp;#39; Cedar trees in planting beds in park. Trees installed using hand tools.</text_data><comment_date>2015-01-09T00:00:00</comment_date></row><row _id="row-5pzs.2jzr_my8e" _uuid="00000000-0000-0000-2D34-2C4225F66282" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5pzs.2jzr_my8e"><intent_id>875241</intent_id><project_id>837631</project_id><text_data>1. general construction2. single3. 1 level4. livinga. nob. noc. yesd. noe. nof. nog. noh. noi. noj. nok. nol. no5. yes6. yes7. no8. no</text_data><comment_date>2017-11-16T00:00:00</comment_date></row><row _id="row-q3p6~yd5n~cvam" _uuid="00000000-0000-0000-FCC2-9AA9116C9F34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q3p6~yd5n~cvam"><intent_id>566544</intent_id><project_id>709718</project_id><text_data>ELIZABETH SMITH14818 WOODBROOK DR W #31LAKEWOOD WA 98439</text_data><comment_date>2013-04-25T00:00:00</comment_date></row><row _id="row-vif9.q9en~r4my" _uuid="00000000-0000-0000-A75E-7896C876D17B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vif9.q9en~r4my"><intent_id>652265</intent_id><project_id>734194</project_id><text_data>Form filed by: AL Morton</text_data><comment_date>2014-09-04T00:00:00</comment_date></row><row _id="row-ff5e_csdn_8uew" _uuid="00000000-0000-0000-AB38-E4A31A46BBF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ff5e_csdn_8uew"><intent_id>878506</intent_id><project_id>839090</project_id><text_data>302591- New Hussey Bleachers for Tyee HS</text_data><comment_date>2017-12-11T00:00:00</comment_date></row><row _id="row-dkx5_f3k8-9d8y" _uuid="00000000-0000-0000-B2C4-CF04CDEB887A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dkx5_f3k8-9d8y"><intent_id>765092</intent_id><project_id>793217</project_id><text_data>Herbicide application with farmall equipment on selecte ornamental turf.</text_data><comment_date>2016-05-31T00:00:00</comment_date></row><row _id="row-i9ez.tquy~8wz6" _uuid="00000000-0000-0000-1A4B-A01CFEE3939C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9ez.tquy~8wz6"><intent_id>723559</intent_id><project_id>773572</project_id><text_data>General will be installing extruded curb using a curb machine</text_data><comment_date>2015-10-06T00:00:00</comment_date></row><row _id="row-5vbq.trk7.87mk" _uuid="00000000-0000-0000-4395-CCD3A999F257" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vbq.trk7.87mk"><intent_id>932359</intent_id><project_id>858719</project_id><text_data>3 Kings PO 24776</text_data><comment_date>2018-09-12T00:00:00</comment_date></row><row _id="row-rvzd_s95f-5xs7" _uuid="00000000-0000-0000-D39A-1FC00388CB5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rvzd_s95f-5xs7"><intent_id>993750</intent_id><project_id>887945</project_id><text_data>$6.85 Fringe:  Enrolled employees for Medical/Health ProgramLaborer:  ShovelTruck and Trailer:  Mob EquipmentOther Truck-WATER Truck:  Dust Control/Clean Asphalt  Motor Patrol Non-Finishing:  Spread Rock</text_data><comment_date>2019-07-23T00:00:00</comment_date></row><row _id="row-ezpc~2vsy.jw5b" _uuid="00000000-0000-0000-1BD6-5D30A63DBEEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezpc~2vsy.jw5b"><intent_id>542892</intent_id><project_id>695916</project_id><text_data>Valley purchases equipment for this project - not just labor.</text_data><comment_date>2012-11-02T00:00:00</comment_date></row><row _id="row-zhgx.nvgm.zchw" _uuid="00000000-0000-0000-6D86-647FEB1ADD89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhgx.nvgm.zchw"><intent_id>799056</intent_id><project_id>806192</project_id><text_data>Filed by Arlene Schuchard.</text_data><comment_date>2016-11-01T00:00:00</comment_date></row><row _id="row-n7gi-7s73_z2fm" _uuid="00000000-0000-0000-D4C1-7D459A4DE33E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n7gi-7s73_z2fm"><intent_id>601081</intent_id><project_id>719111</project_id><text_data>Hired by Prime</text_data><comment_date>2013-10-23T00:00:00</comment_date></row><row _id="row-2jpz_9vbn_7s2j" _uuid="00000000-0000-0000-7E3C-6950E1F95A56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2jpz_9vbn_7s2j"><intent_id>742301</intent_id><project_id>782995</project_id><text_data>1. Weatherization. 2. single family 3.1 4.residence, a. no, b. no, c. yes, d. no, e. no. f. no, g. no, h. no, i. noj.no. k. no.   5. no, 6. no, 7. no 8. no</text_data><comment_date>2016-01-19T00:00:00</comment_date></row><row _id="row-4mqv-wc24~n3xx" _uuid="00000000-0000-0000-1B56-BFB8832933D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4mqv-wc24~n3xx"><intent_id>1147584</intent_id><project_id>963897</project_id><comment_date>2021-05-25T00:00:00</comment_date></row><row _id="row-y8w3~nxem_rv9j" _uuid="00000000-0000-0000-FD7D-4067ECD90897" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8w3~nxem_rv9j"><intent_id>1191185</intent_id><project_id>986818</project_id><text_data>93246/FSD/ Walk-in Freezer</text_data><comment_date>2021-11-04T00:00:00</comment_date></row><row _id="row-m6ek~94s8_t2cj" _uuid="00000000-0000-0000-76F8-5A49C8C8E2C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6ek~94s8_t2cj"><intent_id>1173253</intent_id><project_id>962464</project_id><text_data>Marpac hired us</text_data><comment_date>2021-08-29T00:00:00</comment_date></row><row _id="row-gfps.e52e_46ad" _uuid="00000000-0000-0000-83C7-4B1722C819FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfps.e52e_46ad"><intent_id>696902</intent_id><project_id>763035</project_id><text_data>Wire Furnace and Water heater at 2509 N. Upriver Court, Spokane, WA 99202</text_data><comment_date>2015-05-27T00:00:00</comment_date></row><row _id="row-k5if-eqh8_s7by" _uuid="00000000-0000-0000-04A4-4F3856C03859" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k5if-eqh8_s7by"><intent_id>799059</intent_id><project_id>805912</project_id><text_data>General labors will be sweeping and cleaning demolition debris.</text_data><comment_date>2016-11-01T00:00:00</comment_date></row><row _id="row-gwmw_mrnu.fui5" _uuid="00000000-0000-0000-391B-63117FA63451" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gwmw_mrnu.fui5"><intent_id>1232353</intent_id><project_id>1012494</project_id><text_data>Scope of work; Brush cutting blackberries and ivy. Using; long reach trimmers, loppers, brush cutter and pitch forks</text_data><comment_date>2022-05-10T00:00:00</comment_date></row><row _id="row-p6hg~wq94-z34g" _uuid="00000000-0000-0000-C598-45E9AE3D040E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p6hg~wq94-z34g"><intent_id>916813</intent_id><project_id>851884</project_id><text_data>Other trucks are lowboys used to haul equipment</text_data><comment_date>2018-07-10T00:00:00</comment_date></row><row _id="row-vjqy.wmzp.hmw4" _uuid="00000000-0000-0000-5E8F-5A2F36954F86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vjqy.wmzp.hmw4"><intent_id>887034</intent_id><project_id>843112</project_id><text_data>Check and service oil furnace.</text_data><comment_date>2018-02-07T00:00:00</comment_date></row><row _id="row-d7ve~7m2t~5rt8" _uuid="00000000-0000-0000-D720-B3AF8585E41D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7ve~7m2t~5rt8"><intent_id>837980</intent_id><project_id>823369</project_id><text_data>Other trucks are low boys for hauling equipment.</text_data><comment_date>2017-06-02T00:00:00</comment_date></row><row _id="row-shp2-uizd-jteu" _uuid="00000000-0000-0000-3981-D5F538A768D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-shp2-uizd-jteu"><intent_id>1157751</intent_id><project_id>969338</project_id><text_data>Telecommunication Wifi CablingAll work will be done indoors</text_data><comment_date>2021-07-05T00:00:00</comment_date></row><row _id="row-ycn9_ms2x~bsvz" _uuid="00000000-0000-0000-D798-3177D8B82280" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ycn9_ms2x~bsvz"><intent_id>543296</intent_id><project_id>699208</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-11-16T00:00:00</comment_date></row><row _id="row-qshm-ftqb_35v6" _uuid="00000000-0000-0000-72F3-6C8348165839" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qshm-ftqb_35v6"><intent_id>757082</intent_id><project_id>789764</project_id><text_data>1)We were contracted to replace the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2016-04-18T00:00:00</comment_date></row><row _id="row-dini-riyd.znga" _uuid="00000000-0000-0000-2C5B-557EED723A68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dini-riyd.znga"><intent_id>862664</intent_id><project_id>819967</project_id><text_data>Prime Contractor attested they classified occupation as Janitor.</text_data><comment_date>2017-10-10T00:00:00</comment_date></row><row _id="row-jxbb-zgi2.gz6p" _uuid="00000000-0000-0000-5C2A-4BD96A054F86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jxbb-zgi2.gz6p"><intent_id>1317573</intent_id><project_id>1045916</project_id><text_data>We will be installing an irrigation system, not to exceed 36 inches in depth. We will be installing topsoil using a conveyor truck and plants using various hand tools common for the trade.</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-3jhz.n9z9.vine" _uuid="00000000-0000-0000-1CB5-6C012FDBAD63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3jhz.n9z9.vine"><intent_id>675952</intent_id><project_id>754255</project_id><text_data>The number we have been using is 20067009?</text_data><comment_date>2015-01-23T00:00:00</comment_date></row><row _id="row-x4ei-g8kw-g2wn" _uuid="00000000-0000-0000-AC01-38D7B43DA723" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x4ei-g8kw-g2wn"><intent_id>1200160</intent_id><project_id>992304</project_id><text_data>1.   Replace water heater. 2. Single family dwelling. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2021-12-17T00:00:00</comment_date></row><row _id="row-bmss~9drh-v38f" _uuid="00000000-0000-0000-3FA8-9F4601AD4925" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmss~9drh-v38f"><intent_id>1145790</intent_id><project_id>962951</project_id><text_data>Our licensed journeymen install electrical work as defined by regulation in the Washington Administrative Code. WAC 296-127-01323Inside wireman electrician.	For the purpose of the Washington state public works law, chapter  39.12 RCW, inside wireman electricians plan the layout, install and repair conduit, wiring, electrical fixtures, apparatus, and control equipment in buildings and adjacent yards to provide electricity for power and lighting.	(1) They assemble, install and maintain all electrical lighting, electric heating and cooling equipment, standby motor generators, electric heat pumps, under-floor duct and luminous ceilings.	They install, repair and maintain highway and street lighting systems and highway and street traffic signal systems.	The work includes, but is not limited to:	� The handling and moving of any electrical materials, equipment and apparatus on the job site.	� Welding, burning, brazing, bending, drilling and shaping of all copper, silver, aluminum, angle iron and brackets to be used in connection with the installation and erection of electrical wiring and equipment.	� Measuring, cutting, bending, threading, forming, assembling and installing of electrical conduit, using such tools as hacksaw, pipe threader and conduit bender.	� Pulling wiring through conduit.	� The installation of conduit and interduct raceways for fiber optic cable and the pulling of fiber optic cable through these raceways, except telephone conduit and cable.	Cutting holes in floors and walls for electrical conduit:	� With point and hammer.	� Core-drilled.	� Chasing and channeling necessary to complete any electrical work, including the fabrication and installation of duct and manhole forms incidental to electrical installation.	� Splicing wires by stripping insulation from terminal leads with knife or pliers, twisting or soldering wires together and applying tape or terminal caps.	� Installation and maintenance of lighting fixtures.	� Connecting wiring to lighting fixtures and power equipment.	Assembling and installing of conduit switches, relays, junction boxes, circuit breaker panels, and related accessories and controls.	� Testing continuity of circuit to insure electrical compatibility and safety of components.	� All cleanup required in connection with electrical work.	(2) The following power line construction classifications may assist journeymen wireman in the installation, repair and maintenance of highway and signal lighting systems and highway and street traffic signal systems:	(a) Groundmen.	� Performs the following tasks:	� Manual digging of pole holes, anchor holes and trenches.	� Assembles and erects fixtures.	� Assists in framing of poles, pulling guys.	� Tamping and compacting.	� Driving of 1/2 or 3/4 ton pickup truck.	(b) Head groundman.	� Performs the following tasks:	� Manual digging of pole holes, anchor holes and trenches.	� Assists in framing of poles, pulling guys.	� Assembles and erects fixtures.	� Tamping and compacting.	� Driving of 1/3 or 3/4 ton pickup truck for materials or man haul.	(c) Line equipment operators. Operate caterpillars, trucks equipped with winch and/or boom, hydraulically operated backhoes with or without front end loaders, mounted booms, and any other equipment that does not come within the scope of heavy equipment operators.	(d) Heavy line equipment operators. Operate any piece of equipment which, in accordance with manufacturer's recommended specifications is capable of operating with one hundred or more aggregate feet of boom, be it crane, backhoe or clam shell, drag line, or shovel.This includes all building electrical installation up to the elevator main control. These are in house employees. They are represented by the IBEW Local 46, and 01 Journeymen are paid at the King County prevailing wage rate of $86.30 per hour or above, for their craft.  All work falling into the scope of the elevator mechanic, per WAC 296-96, is to be completed by our subcontractor, in this case Kone Elevator. WAC 296-127-01327Elevator constructors.	For the purpose of the Washington state public works law, chapter  39.12 RCW, elevator constructors assemble and install electric and hydraulic freight and passenger elevators, escalators, and dumbwaiters.	The work includes, but is not limited to:	� Studies blueprints and lays out location of framework, counterbalance rails, motor pump, cylinder, and plunger foundations.	� Drills holes in concrete or structural steel members with portable electric drill, secures anchor bolts or welds brackets to support rails and framework, and verifies alignment with plumb bob and level.	� Cuts prefabricated sections of framework, rails, and other elevator components to specified dimensions, using acetylene torch, power saw, and disc grinder.	� Installs cables, counterweights, pumps, motor foundations, escalator drives, guide rails, elevator cars, and control panels.	� Positions electric motor and equipment on top of elevator shaft, using hoists and cable slings.	� Connects electrical wiring to control panels and electric motors.	� Installs safety and control devices.	� All cleanup required in connection with the installation of elevators.They are represented by IECU Local 19, and are paid at or above the King County wage rate of $100.51 per hour for their craft.  I am well versed on the dividing line between the two trades. I sit on Labor and Industries Elevator Safety Committee and have been a participant in recent clarifications between electrical and conveyance, and I'd be happy to help anyone in your office get clarity on the multitude of crafts a project titled 'elevator modernization' can potentially encompass. My time, however is in high-demand, so I'd request that you ask for that help via phone call. My cell number is 206-354-0876.</text_data><comment_date>2021-09-20T00:00:00</comment_date></row><row _id="row-p6bd-3a9m_ujwu" _uuid="00000000-0000-0000-4311-1374FC53D979" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p6bd-3a9m_ujwu"><intent_id>541499</intent_id><project_id>698458</project_id><text_data>Form filed by: Michael HummelState of WA - Dept. of L&amp;I - Prevailing Wage DivisionExemption Intent Questionnaire form - Seattle Municipal Tower - Cooling ConversionPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:****** 1.  What was the purpose of the project?    Provide onsite support and programming for the Siemens system as directed by the customer.****** 2.  Does this project entail the remodeling or new construction of a facility?    Yes, but not performed by Siemens Employees.****** 3.  What specific tasks did your employees perform?    Siemens' BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.****** 4.  What if any tools did your employees use in the performance of those tasks?   Laptop computer****** 5.  If your employee used no tools, did they engage in any other type of manual, hands on efforts in completing their tasks?    No - none.******To expedite our determination, please be as detailed as possible in responding to these questions.  For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form. To expedite our determination, please be as detailed as possible in responding to these questions.  For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2012-10-24T00:00:00</comment_date></row><row _id="row-mdhx~cizu~h4vv" _uuid="00000000-0000-0000-8F9F-4F312A4B0B1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mdhx~cizu~h4vv"><intent_id>812311</intent_id><project_id>806955</project_id><text_data>Filed by Jodi L. Hill</text_data><comment_date>2017-01-23T00:00:00</comment_date></row><row _id="row-rj9s-qn6w.afi2" _uuid="00000000-0000-0000-55FA-BA1E86EF1C9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rj9s-qn6w.afi2"><intent_id>707508</intent_id><project_id>767427</project_id><text_data>Project Description: Airfield Pavement Maintenance on Runway 3-21 and Taxiways A, A-1 and B-1. General Laborer Duties: Lift, carry and hold material, tools and supplies. Measure distance. Mix, pour and spread asphalt, gravel and other materials using hand tools. Mop, or spread bituminous compounds over pavement for protection. Spray material through hoses to coat and seal surface of runway and taxiway. Clean-up required in connection with work above.</text_data><comment_date>2015-07-16T00:00:00</comment_date></row><row _id="row-wivp~exnf-sxmy" _uuid="00000000-0000-0000-BD96-1D750D3001EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wivp~exnf-sxmy"><intent_id>771950</intent_id><project_id>782620</project_id><text_data>We did SFR insulation work.  SFR.  2.  no, no, yes, no, no, no, no, no, no, no, no, no.  No.  No.  NO.  No.</text_data><comment_date>2016-06-30T00:00:00</comment_date></row><row _id="row-ur3b~2v8z.juxh" _uuid="00000000-0000-0000-9EC6-6899DE31BDF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ur3b~2v8z.juxh"><intent_id>1086623</intent_id><project_id>915904</project_id><text_data>Project # 107799 - Seattle</text_data><comment_date>2020-09-09T00:00:00</comment_date></row><row _id="row-3m2u_b3xm~9rxd" _uuid="00000000-0000-0000-B8FD-CC93F30F7B39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3m2u_b3xm~9rxd"><intent_id>511209</intent_id><project_id>685819</project_id><text_data>Filed by: Thomas E Patterson</text_data><comment_date>2012-05-09T00:00:00</comment_date></row><row _id="row-fkam.e4dw_da9t" _uuid="00000000-0000-0000-6429-8831989A59DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fkam.e4dw_da9t"><intent_id>683884</intent_id><project_id>747085</project_id><text_data>Provide and install cat6 cabling for camera&amp;#39;s, to the nearest MDF or IDF for termination. All cabling will be run indoors.</text_data><comment_date>2015-03-17T00:00:00</comment_date></row><row _id="row-zctv_2yzk.cfwf" _uuid="00000000-0000-0000-C1A3-8E8E6C6D98E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zctv_2yzk.cfwf"><intent_id>1318781</intent_id><project_id>1062831</project_id><text_data>SR53473072 invoice 11986.49</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-zeg8~3i9g.h3km" _uuid="00000000-0000-0000-2A0F-53FEA4E45D65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zeg8~3i9g.h3km"><intent_id>1249548</intent_id><project_id>1022171</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call 		contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-10-14T00:00:00</comment_date></row><row _id="row-vqhr.x226.m62s" _uuid="00000000-0000-0000-0045-280C344D3968" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vqhr.x226.m62s"><intent_id>761957</intent_id><project_id>735578</project_id><text_data>163056 SPU North Transfer Station</text_data><comment_date>2016-05-13T00:00:00</comment_date></row><row _id="row-i2wk.9wue_9ack" _uuid="00000000-0000-0000-534B-1E28299FB386" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2wk.9wue_9ack"><intent_id>495637</intent_id><project_id>680835</project_id><text_data>The scope of work for this project is to provide and install OSP fiber for cameras</text_data><comment_date>2012-01-04T00:00:00</comment_date></row><row _id="row-sy7w~4hzj_b94b" _uuid="00000000-0000-0000-1E23-B252D4852E60" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sy7w~4hzj_b94b"><intent_id>563177</intent_id><project_id>695118</project_id><text_data>Form filed by: Rose Waterman</text_data><comment_date>2013-04-04T00:00:00</comment_date></row><row _id="row-m2cc.j4dd-h484" _uuid="00000000-0000-0000-41C0-7607E5F79240" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2cc.j4dd-h484"><intent_id>1027700</intent_id><project_id>902441</project_id><text_data>Work Order 8992008</text_data><comment_date>2019-12-18T00:00:00</comment_date></row><row _id="row-d6ku.jxy8-sbqx" _uuid="00000000-0000-0000-69A4-5367D08CA861" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d6ku.jxy8-sbqx"><intent_id>624289</intent_id><project_id>732766</project_id><text_data>De-limb and remove Oak tree in sections.  Chip small limbs and dispose of at city yard. Cut tree and large limbs into small sections for city to have removed by crane.</text_data><comment_date>2014-04-10T00:00:00</comment_date></row><row _id="row-nnv8.3rd6.cfwu" _uuid="00000000-0000-0000-B69C-C769FF295959" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nnv8.3rd6.cfwu"><intent_id>1058694</intent_id><project_id>866817</project_id><text_data>1Kathy BuchansFrom: Jameson, Jesse (LNI) &amp;lt;JAJC235@LNI.WA.GOV&amp;gt;Sent: Thursday, September 26, 2019 10:14 AMTo: Kathy BuchansSubject: RE: A-Gas US Inc. dba Rapid Recovery (UBI : 604 390 835)Hi KathyThe recovery or withdrawal only, of refrigerant from cooling equipment where the recovery process is performed byconnecting to an existing valve in the cooling system designed for that purpose, is exempt from contractor registration.Feel free to forward this email to Prevailing WageJesse L JamesonTechnical SpecialistConstruction Contractor Compliance12806 Gateway Dr S, Tukwila WA. 98168206-835-1107From: Kathy Buchans &amp;lt;Kathy.Buchans@raprec.com&amp;gt;Sent: Thursday, September 26, 2019 10:02 AMTo: Jameson, Jesse (LNI) &amp;lt;JAJC235@LNI.WA.GOV&amp;gt;Subject: A-Gas US Inc. dba Rapid Recovery (UBI : 604 390 835)Hello JessieThank you for talking my call. As you have requested, below is a synopsis of our scope of workas it relates to work being performed within the State of Washington. We were operatingunder UBI 603 125 737 as RapRec, Inc (Rapid Recovery). However, we were bought by A-GasUS Inc. several years ago and the correct UBI we should be utilizing is 604 390 855. Althoughwe are in a good position with the Dept of Revenue and Dept of Licensing, apparently we arenot correctly registered as a Contractor under this UBI. Hence, the reason we need identifywhat is further required of us, or not required of us, in order to appropriately use UBI 604 390855 for prevailing wage jobs.2A-Gas US Inc. (dba Rapid Recovery) is a subcontractor to a general, prime, or main contractor,and performing refrigerant abatement services under provisions set forth by the EnvironmentalProtection Agency under Section 608 of the Clean Air Act. Per the Clean Air Act all refrigerantmust be safely abated during the maintenance, service, repair, or disposal of air-conditioningand refrigeration equipment. Rapid Recovery does not perform any additional services otherthan recovering gas from units; we are not in the business of maintenance, service, repair, ordisposal.Again, thank you for your time, and I look forward to your response.KathyKathy BuchansContracts AdministratorT: 623-383-29648932 West Cactus Road, Peoria, Arizona 85381, View MapA-Gas in the Americas is a subsidiary of A-Gas US Holdings Inc.A full copy of our email privacy policy can be viewed on the A-Gas website</text_data><comment_date>2020-05-18T00:00:00</comment_date></row><row _id="row-z28b_9ini~b43q" _uuid="00000000-0000-0000-F104-4A00FB041C41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z28b_9ini~b43q"><intent_id>1041783</intent_id><project_id>910388</project_id><text_data>0420012</text_data><comment_date>2020-02-28T00:00:00</comment_date></row><row _id="row-ferm~meh7~r2aj" _uuid="00000000-0000-0000-78EB-3DC1F9FB8FED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ferm~meh7~r2aj"><intent_id>916166</intent_id><project_id>826938</project_id><text_data>Lawn Rangers &amp;quot;sprayed&amp;quot; for Russian Thistle (weed) the area in and around the SR-28 Round-A-Bout. Lawn Rangers used 4-Gallon Backpack sprayers.</text_data><comment_date>2018-08-03T00:00:00</comment_date></row><row _id="row-6c3u-cimv-uwux" _uuid="00000000-0000-0000-32AE-7E16F2493FF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6c3u-cimv-uwux"><intent_id>1221827</intent_id><project_id>1006137</project_id><text_data>REVISED PTL SO 165285</text_data><comment_date>2022-05-20T00:00:00</comment_date></row><row _id="row-cf2h_yn67.2d4g" _uuid="00000000-0000-0000-37BC-E84D788D45AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cf2h_yn67.2d4g"><intent_id>745039</intent_id><project_id>743359</project_id><text_data>Goodfellow Bros- the prime contractor- is installing supporting beams/ whalers for a road near a hill.Northwest Welding will be welding beams to a whaler for support. Equipment includes a welding unit- welder w/ wire, personal safety equipment. Laborer- fire and safety watch.</text_data><comment_date>2016-02-10T00:00:00</comment_date></row><row _id="row-9fjb.ag2p_yj5s" _uuid="00000000-0000-0000-249D-630408A7163D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9fjb.ag2p_yj5s"><intent_id>534116</intent_id><project_id>668252</project_id><text_data>Kenworth T800/Vactor 2115</text_data><comment_date>2012-09-12T00:00:00</comment_date></row><row _id="row-k8gp~3qxk-xu93" _uuid="00000000-0000-0000-136F-9CB0B4DA7AC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k8gp~3qxk-xu93"><intent_id>1140565</intent_id><project_id>960156</project_id><text_data>Water Truck is 4000 gallon tankDump Truck is 10 Cubic Yard End Dump</text_data><comment_date>2021-04-28T00:00:00</comment_date></row><row _id="row-t27p_r74h~khh5" _uuid="00000000-0000-0000-37EE-7488F02EDE27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t27p_r74h~khh5"><intent_id>945366</intent_id><project_id>863010</project_id><text_data>Roll out weed fabric by hand and secure with jute net staples using a hammer. Use Bobcat to dump the engineered wood fiber in piles, use wheelbarrow to relocate wood fiber and spread by hand using rakes.</text_data><comment_date>2018-12-10T00:00:00</comment_date></row><row _id="row-jbv4~9ia8.yd7c" _uuid="00000000-0000-0000-C238-1FAD91EDBBFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jbv4~9ia8.yd7c"><intent_id>592256</intent_id><project_id>719433</project_id><text_data>1.	Replaced GFCI outlet and repaired wiring in Apt. R132 and repaired wiring in Apt. BB2282.	Apartment3.	2 Stories4.	(a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) Yes (k) n/a5.	Yes6.	Yes7.	Manager�s Office8.	No</text_data><comment_date>2013-12-13T00:00:00</comment_date></row><row _id="row-4j65_r9eq_2cfb" _uuid="00000000-0000-0000-DF1D-9CC6EA9B3BA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4j65_r9eq_2cfb"><intent_id>725138</intent_id><project_id>774195</project_id><text_data>Please put in the notes on the approved intent # 725138 �Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24CFR 965 101.  Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades/occupations</text_data><comment_date>2015-10-15T00:00:00</comment_date></row><row _id="row-xp6b-evmb_ha78" _uuid="00000000-0000-0000-DD2C-67CBF501F140" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xp6b-evmb_ha78"><intent_id>838483</intent_id><project_id>813433</project_id><text_data>Industrial Insurance is covered under Ontario WSIB account #990749. Elizabeth Larose (360) 902-4817 has given us a pass on the need to apply for additional coverage in Washington.</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-6fpx.ku9h_pgv9" _uuid="00000000-0000-0000-F314-F39FC291AF4E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6fpx.ku9h_pgv9"><intent_id>1465659</intent_id><project_id>1023088</project_id><text_data>Hydroseed with perennial rye and wood fiber mulch using Finn T-75 hydroseeder pulled by Ford F-350 pick up truck</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-ztmd~ddgq.dchc" _uuid="00000000-0000-0000-FE88-974958E5074D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ztmd~ddgq.dchc"><intent_id>1465508</intent_id><project_id>1144503</project_id><text_data>Workers' Compensation Account ID is not applicable. JEX is a Tribal Corporation that self-insures through Brown and Brown.</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-depm_yw94~sdi9" _uuid="00000000-0000-0000-6D5B-648CA4656057" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-depm_yw94~sdi9"><intent_id>548428</intent_id><project_id>698067</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2012-12-19T00:00:00</comment_date></row><row _id="row-gf8d~62cz.hv7d" _uuid="00000000-0000-0000-008F-D29C348452A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gf8d~62cz.hv7d"><intent_id>568730</intent_id><project_id>710645</project_id><text_data>3/20 REPROGRAM METASYS CORRECT PROGRAMING ERRORS IN NCMs BACK UP NCMs</text_data><comment_date>2013-05-09T00:00:00</comment_date></row><row _id="row-thms-9pgf_6bwc" _uuid="00000000-0000-0000-081D-1F34D8A85AE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thms-9pgf_6bwc"><intent_id>1042284</intent_id><project_id>910662</project_id><text_data>Pumped 1000 gallons from sump pump.</text_data><comment_date>2020-03-02T00:00:00</comment_date></row><row _id="row-ri93.qbes-snrw" _uuid="00000000-0000-0000-3CDD-2495B071E1D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ri93.qbes-snrw"><intent_id>670279</intent_id><project_id>750975</project_id><text_data>Form filed by: Walt Del Biaggio</text_data><comment_date>2014-12-17T00:00:00</comment_date></row><row _id="row-5z2s-xu26.cwx2" _uuid="00000000-0000-0000-7CC3-CF8AED8B03A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5z2s-xu26.cwx2"><intent_id>563229</intent_id><project_id>708224</project_id><text_data>Form filed by: Laura L Kickbusch</text_data><comment_date>2013-04-04T00:00:00</comment_date></row><row _id="row-8ud7~vvwt_3qqw" _uuid="00000000-0000-0000-D032-B64051E9AE21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ud7~vvwt_3qqw"><intent_id>788033</intent_id><project_id>801996</project_id><text_data>WO# 525205</text_data><comment_date>2016-09-08T00:00:00</comment_date></row><row _id="row-kkzm~fqp6.pnie" _uuid="00000000-0000-0000-D08F-2FEAF0828732" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kkzm~fqp6.pnie"><intent_id>854284</intent_id><project_id>829760</project_id><text_data>#17285</text_data><comment_date>2017-08-11T00:00:00</comment_date></row><row _id="row-r4q2~ie9j-wixw" _uuid="00000000-0000-0000-9CD0-7EC8D01E1B48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r4q2~ie9j-wixw"><intent_id>1166833</intent_id><project_id>959569</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.Rewire 4 existing apartment units that were damaged by a fire.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?Apartment#3 - Including any basement or garage, how many stories or levels does the structure have?3 Stories#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(i) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? YES(l) Other services or uses? NO#5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on site? YES#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2021-08-12T00:00:00</comment_date></row><row _id="row-7n9f-7xnu~u7he" _uuid="00000000-0000-0000-184F-2E9A8AE653CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7n9f-7xnu~u7he"><intent_id>612696</intent_id><project_id>727620</project_id><text_data>Job # 203183</text_data><comment_date>2014-01-17T00:00:00</comment_date></row><row _id="row-8umm.hn2f.4dky" _uuid="00000000-0000-0000-2CB8-C4C8E205037F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8umm.hn2f.4dky"><intent_id>664664</intent_id><project_id>742454</project_id><text_data>In order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2-apartment3-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- yesk- yes6- yes7- no8- no167th Ave NE</text_data><comment_date>2014-11-10T00:00:00</comment_date></row><row _id="row-i89x~xtai~gpme" _uuid="00000000-0000-0000-AB2C-B6FE84ACC56D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i89x~xtai~gpme"><intent_id>781173</intent_id><project_id>780570</project_id><text_data>B)Anderson Poolworks scope of work: Removal of existing vinyl liner and export of liner to landfill. Subsurface preparation to accept tile and pool surface material.  Pocure and install gutter cap tile with specialty fingertip tile at the gutter edge. Install waterline tile with depth marker tiles per Washington state code, including gutter edging. Install  racing lint tile and wall targets. Install new floor inlet fittings and new Virginia Graeme baker pool and spa safety act main drain covers to replace existing.  Install new hydrostatic relief valves. Installation of hydrazzo, arctic white pool surface material to the interior of swimming pool. Two week pool commissioning and owner training for care and maintenance. Installation scope:decommissioning and remove old unit. Hang new unit. Plumb in sample cell lines. Interface connections to existing external components.  Set up and commissioning. If units are plug and play electrical may not be needed.  Mount UV control box and UV vessel per manufacture instructions. Program and commission UV system.C) Laborer&amp;#39;s duties: subsurface preparation of pool surface. Two week pool commissioning. Owner training. Decommission and removal of old unit.</text_data><comment_date>2016-08-17T00:00:00</comment_date></row><row _id="row-av72-qfh9.yxjk" _uuid="00000000-0000-0000-2E17-B818885950E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-av72-qfh9.yxjk"><intent_id>586308</intent_id><project_id>717295</project_id><text_data>Intent covers the following addresses:1505 S Rd 40 E # 14, Pasco1505 S Rd 40 E # 303, Pasco1732 N 17th, Pasco23 N 68th, West Richland</text_data><comment_date>2013-08-08T00:00:00</comment_date></row><row _id="row-6qzw_fvnu-by5u" _uuid="00000000-0000-0000-F3EA-D02A283513D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6qzw_fvnu-by5u"><intent_id>862337</intent_id><project_id>832457</project_id><text_data>Installation of temporary Radon Mitigation</text_data><comment_date>2017-09-12T00:00:00</comment_date></row><row _id="row-zmsy-yth7~dusa" _uuid="00000000-0000-0000-4FCD-651752E8CBB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zmsy-yth7~dusa"><intent_id>1131401</intent_id><project_id>953857</project_id><text_data>$2.40 Paid Time Off / Sick Leave, $9.16 Health Security, $11.00 Pension, $0.74 Apprenticeship, $7.95 Annuity, and $0.28 Ironworker Management Progressive Action Cooperative Trust.</text_data><comment_date>2021-04-15T00:00:00</comment_date></row><row _id="row-thvf_mstw_hdi3" _uuid="00000000-0000-0000-737E-303282E29E57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thvf_mstw_hdi3"><intent_id>701292</intent_id><project_id>757999</project_id><text_data>FOrm filed by:  Anaira Green</text_data><comment_date>2015-06-17T00:00:00</comment_date></row><row _id="row-873e~n3uz_rxs2" _uuid="00000000-0000-0000-48BA-3A215F349D09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-873e~n3uz_rxs2"><intent_id>818088</intent_id><project_id>808659</project_id><text_data>#1 install power to a split heat pump and run control wire from outdoor to indoor unit, #2 single family residence, #3 2, #4 C #5yes #6 yes #7 no #8 No</text_data><comment_date>2017-02-27T00:00:00</comment_date></row><row _id="row-wvx9_2mrr_wddk" _uuid="00000000-0000-0000-4ECA-77B716A9BCC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wvx9_2mrr_wddk"><intent_id>1175875</intent_id><project_id>978424</project_id><text_data>1) replace air handler and heat pump 2)single family 3) 1 level 4) living a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no 5)no 6)no 7)no 8)no</text_data><comment_date>2021-09-08T00:00:00</comment_date></row><row _id="row-9ww8~zv43~qs3p" _uuid="00000000-0000-0000-7FCB-48A2D4591A39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ww8~zv43~qs3p"><intent_id>992847</intent_id><project_id>886589</project_id><text_data>Remove existing coping and replace with new</text_data><comment_date>2019-07-18T00:00:00</comment_date></row><row _id="row-8yeg-g477~n52g" _uuid="00000000-0000-0000-6C91-77753A60834C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yeg-g477~n52g"><intent_id>904283</intent_id><project_id>850588</project_id><text_data>The erosion control method being used for this contract at this present time will be mulch &amp; woodstraw.</text_data><comment_date>2018-08-13T00:00:00</comment_date></row><row _id="row-sdcm~ppmk~i3e4" _uuid="00000000-0000-0000-5212-FF803DC93C7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sdcm~ppmk~i3e4"><intent_id>1144522</intent_id><project_id>962304</project_id><text_data>119992-001</text_data><comment_date>2021-05-13T00:00:00</comment_date></row><row _id="row-e3rh-tuuq-uwrb" _uuid="00000000-0000-0000-ACCC-2D028B152D93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e3rh-tuuq-uwrb"><intent_id>593858</intent_id><project_id>716819</project_id><text_data>other truck is a 1999 kenworth 56GVW truck with a 3000 gallon tank on back.landscape truck is a one ton pickup truck for hauling a 500 gallon tank or hauling strawlandscape labor is for planting seed and fertlilizer</text_data><comment_date>2013-09-16T00:00:00</comment_date></row><row _id="row-jxij.gxrb~e8bp" _uuid="00000000-0000-0000-801E-D0EDCA6FC15F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jxij.gxrb~e8bp"><intent_id>706125</intent_id><project_id>757246</project_id><text_data>Job # 100864-006 related to 200364-001</text_data><comment_date>2015-07-08T00:00:00</comment_date></row><row _id="row-hqjg~848g-spz2" _uuid="00000000-0000-0000-B056-9D02C52749C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hqjg~848g-spz2"><intent_id>1026438</intent_id><project_id>896868</project_id><text_data>Worker's Compensation Account is with Idaho State Insurance Fund</text_data><comment_date>2019-12-11T00:00:00</comment_date></row><row _id="row-qzc7-u5zw-kf7t" _uuid="00000000-0000-0000-AFF3-DD59A574B7B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qzc7-u5zw-kf7t"><intent_id>1492806</intent_id><project_id>1117314</project_id><text_data>Health Trust  $9.46   Washington State Pension Fund  $9.56   National Pension Fund  $3.23   International Training Fund  $0.10   Industrial Improvement Trust  $0.50   Mechanical Contractors Association of Western Washington  $0.10   Joint Apprenticeship and Training Committee  $1.53   Supplemental Pension  $8.00   Fringe Benefit Total $32.48</text_data><comment_date>2024-12-06T00:00:00</comment_date></row><row _id="row-v3rx-dnuz-xnci" _uuid="00000000-0000-0000-E2E8-844A9A7FEAA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3rx-dnuz-xnci"><intent_id>808446</intent_id><project_id>809948</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2016-12-22T00:00:00</comment_date></row><row _id="row-3u7h_gy8a-ac5h" _uuid="00000000-0000-0000-63DD-C1D1E4745EB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3u7h_gy8a-ac5h"><intent_id>612269</intent_id><project_id>721411</project_id><text_data>Western States Fire Protection is our offsite subcontractor for drawing &amp; design only.  No labor hours will be expended on project site.</text_data><comment_date>2015-08-20T00:00:00</comment_date></row><row _id="row-sj6t~23u7_ztsu" _uuid="00000000-0000-0000-4804-6A6E1BC0FCA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sj6t~23u7_ztsu"><intent_id>597230</intent_id><project_id>719338</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.Filed by Julie Magalei.</text_data><comment_date>2013-10-02T00:00:00</comment_date></row><row _id="row-g2hx_t3k6~jnnv" _uuid="00000000-0000-0000-CF16-C93F93592B2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g2hx_t3k6~jnnv"><intent_id>1097027</intent_id><project_id>936823</project_id><text_data>Fringes: Vacation $4.00, Assessment $1.30, Insurance $9.01, Pension $14.55, Training $2.08, Industry Improvement $.50</text_data><comment_date>2020-10-19T00:00:00</comment_date></row><row _id="row-xh3v-nyte~69mm" _uuid="00000000-0000-0000-72A9-57F1D3738299" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xh3v-nyte~69mm"><intent_id>656718</intent_id><project_id>741847</project_id><text_data>Form filed by: Ashley SellandHealth $8.35 / Pension $9.66 / Training $0.68 - Total $18.69Job: 42517</text_data><comment_date>2014-09-24T00:00:00</comment_date></row><row _id="row-vqy2~utc8_b9dj" _uuid="00000000-0000-0000-5EFF-7E257578D871" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vqy2~utc8_b9dj"><intent_id>881393</intent_id><project_id>829353</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.ACI Job No. 17-022</text_data><comment_date>2018-01-02T00:00:00</comment_date></row><row _id="row-u4kx-wnyq.qd7c" _uuid="00000000-0000-0000-1248-07A152FEADC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u4kx-wnyq.qd7c"><intent_id>863111</intent_id><project_id>832747</project_id><text_data>Filed by Leslie J. Johnson</text_data><comment_date>2017-09-15T00:00:00</comment_date></row><row _id="row-3w4v-6rfj~ecui" _uuid="00000000-0000-0000-C21C-C4DA8454C19C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3w4v-6rfj~ecui"><intent_id>1275488</intent_id><project_id>990580</project_id><text_data>I Believe So.</text_data><comment_date>2022-10-17T00:00:00</comment_date></row><row _id="row-ihup_kfgy-iqb7" _uuid="00000000-0000-0000-2911-68E0657A9151" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihup_kfgy-iqb7"><intent_id>1092289</intent_id><project_id>933285</project_id><text_data>Idaho State Insurance Fund is the workman compensation #659263</text_data><comment_date>2020-09-30T00:00:00</comment_date></row><row _id="row-ya85~qhu4-8n8z" _uuid="00000000-0000-0000-9279-ADFE35CB7FB4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ya85~qhu4-8n8z"><intent_id>1283648</intent_id><project_id>889036</project_id><text_data>Truck Drivers will be driving either a 2019 HINO 268A or 2016 HINO 155 flatbed truck. The purpose is toget materials and/or prefabricated materials to the jobsite.</text_data><comment_date>2022-11-15T00:00:00</comment_date></row><row _id="row-4met~iq9i.u6sc" _uuid="00000000-0000-0000-E646-B71CEEB061A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4met~iq9i.u6sc"><intent_id>667398</intent_id><project_id>749571</project_id><text_data>Form filed by: Kathleen Casey</text_data><comment_date>2014-11-25T00:00:00</comment_date></row><row _id="row-p48e_kmcq.zba2" _uuid="00000000-0000-0000-647F-55AF36B779D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p48e_kmcq.zba2"><intent_id>494473</intent_id><project_id>677461</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2012-01-12T00:00:00</comment_date></row><row _id="row-kv4v_zus5_f65a" _uuid="00000000-0000-0000-54E7-8D22C9B7580E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kv4v_zus5_f65a"><intent_id>894370</intent_id><project_id>841465</project_id><text_data>Filed by Petr Kasing</text_data><comment_date>2018-03-22T00:00:00</comment_date></row><row _id="row-itn2~bpum~ggt8" _uuid="00000000-0000-0000-F51E-A3417D2B72CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-itn2~bpum~ggt8"><intent_id>1287425</intent_id><project_id>1043173</project_id><text_data>SA 12832 - 2022.2023</text_data><comment_date>2022-12-04T00:00:00</comment_date></row><row _id="row-p4f8-4dgm-jxh5" _uuid="00000000-0000-0000-48C9-497A891E4BB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4f8-4dgm-jxh5"><intent_id>1102527</intent_id><project_id>923123</project_id><text_data>NW PENSION            9.50     LOCAL APPR            1.10     HEALTH CARE / VEB          12.77     ORG TRUST            1.00     IND FUND            0.65     NATL PENSION            4.24     ITI/NEMI/SMOHI            0.17     NW SUPPLEMENTAL            0.79     CLEAN CARD            0.07           TOTAL          30.29               BT Journeyman</text_data><comment_date>2020-11-10T00:00:00</comment_date></row><row _id="row-564v~pqxq-gk8r" _uuid="00000000-0000-0000-E952-AA0F6C0EBAE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-564v~pqxq-gk8r"><intent_id>982390</intent_id><project_id>883125</project_id><text_data>FILED BY JENNIFER TURNERProject is exempt from State Prevailing Wage Rates based on the Housing Act of 1937 &amp; 24 CFR 965.101. All workers will be paid in accordance with Davis Bacon wage requirements</text_data><comment_date>2019-06-05T00:00:00</comment_date></row><row _id="row-y5sv~wjbc_du83" _uuid="00000000-0000-0000-2B1D-C2241DC4B52E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5sv~wjbc_du83"><intent_id>529320</intent_id><project_id>689446</project_id><text_data>1) Yes 2)Houses have basements and are 2 storys 3a) some 3b) No 3c) Some 3d) No 3e) No 3f) No 3g) Houses workers for Seattle City light Dam. 4) Yes 5) Yes 6) No 7) No</text_data><comment_date>2012-08-22T00:00:00</comment_date></row><row _id="row-hnnj_s2km~be5g" _uuid="00000000-0000-0000-4B71-4507B347F269" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hnnj_s2km~be5g"><intent_id>1118181</intent_id><project_id>919006</project_id><text_data>353226</text_data><comment_date>2021-01-27T00:00:00</comment_date></row><row _id="row-ufy3_5z8m.zzke" _uuid="00000000-0000-0000-B683-2FC15C5D5B55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ufy3_5z8m.zzke"><intent_id>1315121</intent_id><project_id>1060604</project_id><text_data>Other Trucks mean Pickup trucks with trailers etc.</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-6kgr~9skc~2vka" _uuid="00000000-0000-0000-6E26-282CD7C86F22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6kgr~9skc~2vka"><intent_id>514259</intent_id><project_id>688561</project_id><text_data>12191683</text_data><comment_date>2012-05-30T00:00:00</comment_date></row><row _id="row-zb4i.9zcf~zxft" _uuid="00000000-0000-0000-FA80-14DF4BD49956" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zb4i.9zcf~zxft"><intent_id>1206151</intent_id><project_id>991548</project_id><text_data>Single Family Home#1 - Describe the work that your firm was contracted to perform INSULATION#2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominiumNO, or other residential structure? NO#3 - Including any basement or garage, how many stories or levels does the structure have? ONE#4 - What is the building used for? --Answer 'yes' or 'no' to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO G) Is each room and/or bed in the structure rented separately? NO (k) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager's office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2022-01-21T00:00:00</comment_date></row><row _id="row-h5c5-8ae2.ztr4" _uuid="00000000-0000-0000-2D1C-259A421827BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h5c5-8ae2.ztr4"><intent_id>698517</intent_id><project_id>763327</project_id><text_data>2 story 4)a-no b-no c-yes d-no e-no f-no g-no h-no i-no j-yes 5)yes 6)yes 7)yes 8)no</text_data><comment_date>2015-06-05T00:00:00</comment_date></row><row _id="row-bjpq_z3w4-s6wr" _uuid="00000000-0000-0000-CE85-84AADAEC73E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjpq_z3w4-s6wr"><intent_id>583845</intent_id><project_id>712494</project_id><text_data>Owner / OperatorDump Truck Driver</text_data><comment_date>2013-07-28T00:00:00</comment_date></row><row _id="row-y54g-mwuu.7xfz" _uuid="00000000-0000-0000-F5D2-70A56E703AA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y54g-mwuu.7xfz"><intent_id>540443</intent_id><project_id>695144</project_id><text_data>Form filed by: Michael HummelState of WA - Dept. of L&amp;I - Prevailing Wage DivisionExemption Intent Questionnaire form - WA History Museum &amp; Research Center Energy ImprovementPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:****** 1.  What was the purpose of the project?    The purpose of this project is to provide software programming of the Siemens DDC panel.****** 2.  Does this project entail the remodeling or new construction of a facility?    No.****** 3.  What specific tasks did your employees perform?    Siemens' BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.****** 4.  What if any tools did your employees use in the performance of those tasks?   Laptop computer****** 5.  If your employee used no tools, did they engage in any other type of manual, hands on efforts in completing their tasks?    No - none.To expedite our determination, please be as detailed as possible in responding to these questions.  For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form. To expedite our determination, please be as detailed as possible in responding to these questions.  For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2012-10-18T00:00:00</comment_date></row><row _id="row-8y8u~3s7v-8fp8" _uuid="00000000-0000-0000-4CDA-11B82C2E438F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8y8u~3s7v-8fp8"><intent_id>907866</intent_id><project_id>851757</project_id><text_data>Hm Job 4083 - TJ</text_data><comment_date>2018-05-30T00:00:00</comment_date></row><row _id="row-nmac_jaew~x6yy" _uuid="00000000-0000-0000-CEC8-EEA422E1B569" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nmac_jaew~x6yy"><intent_id>722347</intent_id><project_id>773062</project_id><text_data>FRINGE BENEFITS, PER HOUR:  HEALTH,WELFARE,DENTAL - $9.01; WA STATE PENSION - $3.42; NAT&amp;#39;L PENSION - $1.87; INT&amp;#39;L TRAINING FUND - $.10; INDUSTRY IMPROVEMENT FUND - $.35; JATC - $1.63; SUPPLEMENTAL PENSION - $4.00.  HOURLY WAGE RATE INCLUDES $4.00 PER HOUR VACATION.</text_data><comment_date>2015-09-23T00:00:00</comment_date></row><row _id="row-vy4e~pwsw~3pme" _uuid="00000000-0000-0000-F0F5-2DDCF1ACF6F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vy4e~pwsw~3pme"><intent_id>522610</intent_id><project_id>691696</project_id><text_data>Filed by Mike Porter</text_data><comment_date>2012-07-17T00:00:00</comment_date></row><row _id="row-ej33.u32q~u6qk" _uuid="00000000-0000-0000-912F-73B96CA41184" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ej33.u32q~u6qk"><intent_id>1148372</intent_id><project_id>964327</project_id><text_data>Fringe Benefit Calculations:  Medical $3.06, Vacation $.085 = $3.91.</text_data><comment_date>2021-05-27T00:00:00</comment_date></row><row _id="row-xfjj-xjux~xpt7" _uuid="00000000-0000-0000-1443-791C1E4C1AE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xfjj-xjux~xpt7"><intent_id>626859</intent_id><project_id>733806</project_id><text_data>#1 - Install Ductless Heat Pump #2 - single family dwelling #3 - 1#4 -Residence (a)no(b) no(c)yes (d) no (e) no (f) no (g) no(h) no (i) no (j) no (k) no #5 - yes#6 - yes#7 - no #8 - no</text_data><comment_date>2014-04-27T00:00:00</comment_date></row><row _id="row-gsbx-8i25.8ji9" _uuid="00000000-0000-0000-A781-270770903F9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gsbx-8i25.8ji9"><intent_id>603229</intent_id><project_id>723433</project_id><text_data>TELECOMMUNICATION TECHNICIANS WORK DESCRIPTIONProvide and install network and telephone cable between instruments, terminals and sets and the connections to the distribution cable.Provide and install Blocks and Subpanels where large feed cables terminate at the distribution frames in the IDF or MDFProvide and install riser cables between floors from the MDF to the IDFLabel and test the cableINDOOR INSTALLATION</text_data><comment_date>2013-11-06T00:00:00</comment_date></row><row _id="row-x3aw.4tc7.wi8m" _uuid="00000000-0000-0000-927F-2FAEC96796AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3aw.4tc7.wi8m"><intent_id>952738</intent_id><project_id>869617</project_id><text_data>Filed by Ken Hodges</text_data><comment_date>2018-12-31T00:00:00</comment_date></row><row _id="row-45hc_pxa8_f8iy" _uuid="00000000-0000-0000-6D12-55DD966C28CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-45hc_pxa8_f8iy"><intent_id>1318641</intent_id><project_id>1060943</project_id><text_data>HVAC fabrication labor performed at Capital's shop located in Lacey, Thurston Co.</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-td8g-ncru.thi3" _uuid="00000000-0000-0000-FB3C-DD572AC10733" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-td8g-ncru.thi3"><intent_id>1119353</intent_id><project_id>948859</project_id><text_data>PC1Job #4303CB</text_data><comment_date>2021-02-02T00:00:00</comment_date></row><row _id="row-8n32-gy7r_cm8g" _uuid="00000000-0000-0000-D1D4-CE037B54EBA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8n32-gy7r_cm8g"><intent_id>1318573</intent_id><project_id>1062696</project_id><text_data>10051-5 2023</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-h9js~xquz-3utn" _uuid="00000000-0000-0000-03B3-A1528C4A8621" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h9js~xquz-3utn"><intent_id>579128</intent_id><project_id>714735</project_id><text_data>H2O is an Idaho employer (bring employees from Idaho to do the work) with work comp coverage through Idaho State Insurance Fund policy #527115 and Idaho unemployment acct#0000975583.</text_data><comment_date>2013-07-03T00:00:00</comment_date></row><row _id="row-k3us-bzgx.727d" _uuid="00000000-0000-0000-CDD3-A1E1B76E98AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3us-bzgx.727d"><intent_id>742008</intent_id><project_id>779007</project_id><text_data>1. Electrical2.apartment3.14. a. nob.noc.yesd.noe. nof.nog.noh.noi.noj.nok.no5. yes6. yes7.no</text_data><comment_date>2016-01-15T00:00:00</comment_date></row><row _id="row-u54d~88xs_3x5x" _uuid="00000000-0000-0000-6AC2-377CB7422A82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u54d~88xs_3x5x"><intent_id>991704</intent_id><project_id>878772</project_id><text_data>Truck Driver: Water Tank Truck (0-3000) gallons. Purpose: Dust control.Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2020-02-03T00:00:00</comment_date></row><row _id="row-rhhn~r8sp.uy9w" _uuid="00000000-0000-0000-D7A9-20C9F1594F85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rhhn~r8sp.uy9w"><intent_id>588679</intent_id><project_id>718131</project_id><text_data>We are unaware as to which technicians will be on site to perform work so we cannot calculate the fringe at this time.</text_data><comment_date>2013-08-20T00:00:00</comment_date></row><row _id="row-zf49.yaq3_5mq7" _uuid="00000000-0000-0000-D737-7BDC7988F766" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zf49.yaq3_5mq7"><intent_id>557025</intent_id><project_id>704989</project_id><text_data>We will also be using the apprentice rates for both trades at the prevailing wage rate, fringe benefits are 0, up to 2 workers.</text_data><comment_date>2013-02-20T00:00:00</comment_date></row><row _id="row-xcy4.p5w7.ary7" _uuid="00000000-0000-0000-59CE-4F2EC10DED81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xcy4.p5w7.ary7"><intent_id>621415</intent_id><project_id>731484</project_id><text_data>1-install new ductless heat pump2-Single family 3-one story with basement4-a-n,b-n,c-y,d-n,e-n,f-n,g-n,e-n,f-n,g-n,h-n,i-n,j-n,k-n.</text_data><comment_date>2014-03-21T00:00:00</comment_date></row><row _id="row-p46e_jqm2~qvsc" _uuid="00000000-0000-0000-1E34-476612FEF466" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p46e_jqm2~qvsc"><intent_id>540637</intent_id><project_id>698138</project_id><text_data>10/30/12: Truck drivers: Other trucks not needed, added in error.  Removed.</text_data><comment_date>2012-10-30T00:00:00</comment_date></row><row _id="row-9tjm-r22q_9kx2" _uuid="00000000-0000-0000-867A-15AEE4C4C739" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9tjm-r22q_9kx2"><intent_id>1168870</intent_id><project_id>974966</project_id><text_data>Cement Masons Finishers: Health &amp; Welfare $8.09, Pension $10.10, Training $0.85Laborers: Health &amp; Welfare $7.20, Pension $5.04, Training $0.95, WCISAP (WA Construction Industry Substance Abuse Program) $0.06, NWLECET (NW Laborers'-Employers Cooperation and Education Team) $0.14Ironworkers: Health &amp; Welfare $9.20, Pension $11.00, Training $0.74, Annuity $7.95, IMPACT (Ironworkers Management Progressive Action Cooperative Trust) $0.29Carpenters: Health &amp; Welfare $8.51, Pension $8.60, Training $0.91, WCISAP (WA Construction Industry Substance Abuse Program) $.06 Power Equipment Operators: Health &amp; Welfare $6.57, Pension $15.15, Training $.70, National Apprenticeship Training $0.05</text_data><comment_date>2021-08-24T00:00:00</comment_date></row><row _id="row-wxx3_krq6-22em" _uuid="00000000-0000-0000-4DF6-56554AFEE888" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wxx3_krq6-22em"><intent_id>774410</intent_id><project_id>792841</project_id><text_data>026015</text_data><comment_date>2016-07-13T00:00:00</comment_date></row><row _id="row-f7j2~pbwu_bpjf" _uuid="00000000-0000-0000-A8E9-040596FCEB57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f7j2~pbwu_bpjf"><intent_id>1180401</intent_id><project_id>980810</project_id><text_data>PPC #21386</text_data><comment_date>2021-09-23T00:00:00</comment_date></row><row _id="row-thrw-hceb.qmgd" _uuid="00000000-0000-0000-1925-CB5AB2FB5AC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thrw-hceb.qmgd"><intent_id>680630</intent_id><project_id>732745</project_id><text_data>Form filed by: David Dorsh</text_data><comment_date>2015-02-24T00:00:00</comment_date></row><row _id="row-bf3d_xfdu-6hs7" _uuid="00000000-0000-0000-0777-CC8888F464C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bf3d_xfdu-6hs7"><intent_id>743436</intent_id><project_id>774293</project_id><text_data>Stacked Block 3&amp;#39; Walls, The Trackhoe is a Mini Excavator under 15 tons</text_data><comment_date>2016-01-29T00:00:00</comment_date></row><row _id="row-9awn_r6mn-5mbp" _uuid="00000000-0000-0000-7142-95E90D1C1551" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9awn_r6mn-5mbp"><intent_id>848407</intent_id><project_id>820846</project_id><text_data>Kyle Leslie2007 W Spruce St.Moses Lake, WA 98837</text_data><comment_date>2017-07-18T00:00:00</comment_date></row><row _id="row-xjc5_whnd-st34" _uuid="00000000-0000-0000-9B26-459E33F50E2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xjc5_whnd-st34"><intent_id>1088085</intent_id><project_id>921223</project_id><text_data>WE WERE AWARDED THE SECOND CONTRACT - COLVILLE (CITY). LOCATED IN STEVENS COUNTY.WE WILL BE PAYING PW RATES TO ELECTRICIANS-INSIDE (2) PREVAILING WAGE RATE $57.77. WAGE $54.28 FRINGE: $3.49.WE WILL BE PAYING ELECTRICAL TRAINEE STEP 2 - APPRENTICE - WAGE $28.66. FRINGE IS $2.08I CALLED LNI AND THE GENTELMAN STATED TO ADD THIS TO THE NOTES AND NOTATE IT ON THE AFFIDAVIT AS WELL. 2 CONTRACTS UNDER 1 INTENT ID #. COLVILLE AWARDED AMOUNT IS $30,573.62 Thank you, Johanna (Doick) Brown</text_data><comment_date>2020-12-29T00:00:00</comment_date></row><row _id="row-zs8g-x9wr_4f6d" _uuid="00000000-0000-0000-C107-B5B9DAACEE95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zs8g-x9wr_4f6d"><intent_id>972478</intent_id><project_id>878464</project_id><text_data>Jobs: Gaudinier</text_data><comment_date>2019-04-18T00:00:00</comment_date></row><row _id="row-d4br~div2_wrsm" _uuid="00000000-0000-0000-B6FB-F9687B1FFD20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4br~div2_wrsm"><intent_id>901289</intent_id><project_id>840473</project_id><text_data>This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2018-05-03T00:00:00</comment_date></row><row _id="row-rsc6.9jyp~w59j" _uuid="00000000-0000-0000-ADED-13E6DB1640D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rsc6.9jyp~w59j"><intent_id>889462</intent_id><project_id>844256</project_id><text_data>Removal of plants and debris.  Owner working on site will operate landscape equipment</text_data><comment_date>2018-02-21T00:00:00</comment_date></row><row _id="row-xhcu_bbku.8bn6" _uuid="00000000-0000-0000-41A0-B852BC9328E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xhcu_bbku.8bn6"><intent_id>589561</intent_id><project_id>714137</project_id><text_data>Form Filed By: Fred Zittleman</text_data><comment_date>2013-08-23T00:00:00</comment_date></row><row _id="row-93yt-hysf.wdmr" _uuid="00000000-0000-0000-6A41-7CCD0F8A0B14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-93yt-hysf.wdmr"><intent_id>720243</intent_id><project_id>766854</project_id><text_data>Fringe-$1.31 vacation, $3.33 medical=$4.64.</text_data><comment_date>2015-09-11T00:00:00</comment_date></row><row _id="row-z6ev~6bup~rrdv" _uuid="00000000-0000-0000-D7C0-BFF981910E86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z6ev~6bup~rrdv"><intent_id>703905</intent_id><project_id>729565</project_id><text_data>GARY REED &amp; SONS LLC IS A DUMP TRUCKING COMPANY ---- OWNERS  GARY REED , JOE REED , JEFF REED</text_data><comment_date>2015-06-26T00:00:00</comment_date></row><row _id="row-y8vr-ib9t-d525" _uuid="00000000-0000-0000-1ADB-D87D50F02AA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8vr-ib9t-d525"><intent_id>1116982</intent_id><project_id>930023</project_id><text_data>JCI Project #1N59-0029</text_data><comment_date>2021-01-22T00:00:00</comment_date></row><row _id="row-3g4d.xd6z-ckfk" _uuid="00000000-0000-0000-8F28-5E1FB8B76D0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3g4d.xd6z-ckfk"><intent_id>1146831</intent_id><project_id>962361</project_id><text_data>Install fiber inside from MDF at QMS to wrestling room.</text_data><comment_date>2021-05-23T00:00:00</comment_date></row><row _id="row-46us-vvf7.9sdz" _uuid="00000000-0000-0000-E37F-003DA0B3717B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-46us-vvf7.9sdz"><intent_id>770253</intent_id><project_id>795190</project_id><text_data>Help take out old Gas funace and help new furnace put in</text_data><comment_date>2016-06-23T00:00:00</comment_date></row><row _id="row-yhjb_sxgm.mspi" _uuid="00000000-0000-0000-2D5B-BF4E1ED94CE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yhjb_sxgm.mspi"><intent_id>1359612</intent_id><project_id>1083177</project_id><text_data>Pac Environmental #142850</text_data><comment_date>2023-08-31T00:00:00</comment_date></row><row _id="row-imap_udwf-mrt7" _uuid="00000000-0000-0000-422D-C845FFB5B5B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imap_udwf-mrt7"><intent_id>759038</intent_id><project_id>767915</project_id><text_data>Electronic Tech:  Wage $31.50, District 9 Pension $1.45, Edison Pension $4,50, NEBF $.95, Health $9.55, Flex $1.20, Apprenticeship $.70, BLMCC $.20</text_data><comment_date>2016-04-28T00:00:00</comment_date></row><row _id="row-dkqm~z8t3~vh39" _uuid="00000000-0000-0000-8D63-F076E4EEAE63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dkqm~z8t3~vh39"><intent_id>632220</intent_id><project_id>735980</project_id><text_data>Green Effects Inc will provide lawn maintenance at the various library sites. We will use mowers of various sizes, line edgers, hand pruners, shovels, rakes, power shears and hula hoes. If we provide irrigation repair/maintenance the workers will use wheelbarrows, shovels, rakes, pipe saw and pipe wrench.</text_data><comment_date>2014-05-29T00:00:00</comment_date></row><row _id="row-zzhv_5vhh_axt6" _uuid="00000000-0000-0000-556F-8FFD4AAA98F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zzhv_5vhh_axt6"><intent_id>483940</intent_id><project_id>667794</project_id><text_data>408 west pine st #60union gap,wa 98903</text_data><comment_date>2011-10-15T00:00:00</comment_date></row><row _id="row-j6d2_cmvu_5isc" _uuid="00000000-0000-0000-2318-9A362120CAB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j6d2_cmvu_5isc"><intent_id>1500208</intent_id><project_id>1159979</project_id><text_data>Network cabling, fiber backbone, IDF buildout, Nurse call cable install, security cable install</text_data><comment_date>2025-01-09T00:00:00</comment_date></row><row _id="row-84ne-5vjt~8jna" _uuid="00000000-0000-0000-ED78-85E014702E03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-84ne-5vjt~8jna"><intent_id>1508435</intent_id><project_id>1169732</project_id><text_data>Fringes: Vacation $5.50, Assessment $1.30, Insurance $10.46, Pension $20.79, Training $1.63, Industry Improvement $.50</text_data><comment_date>2025-02-10T00:00:00</comment_date></row><row _id="row-agtt.gcvy-6u9i" _uuid="00000000-0000-0000-1952-C9A7B57F7D81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-agtt.gcvy-6u9i"><intent_id>1038007</intent_id><project_id>908221</project_id><text_data>#1 - Describe the work that your firm was contracted to perform INSULATION#2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer 'yes' or 'no' to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2020-02-12T00:00:00</comment_date></row><row _id="row-xb25-pzym.kquw" _uuid="00000000-0000-0000-B500-56957B12FC09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xb25-pzym.kquw"><intent_id>559560</intent_id><project_id>706579</project_id><text_data>Install outdoor cable in existing underground conduit.</text_data><comment_date>2013-03-12T00:00:00</comment_date></row><row _id="row-j3xx_tkn6_85x4" _uuid="00000000-0000-0000-AC1C-51715038F539" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j3xx_tkn6_85x4"><intent_id>1081229</intent_id><project_id>929512</project_id><text_data>Truck -Other is for the F450 Service Truck</text_data><comment_date>2020-08-18T00:00:00</comment_date></row><row _id="row-p57u.2qsr_bttf" _uuid="00000000-0000-0000-7AA3-46B4CD3EA593" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p57u.2qsr_bttf"><intent_id>917666</intent_id><project_id>847055</project_id><text_data>GIL MAGANA102 2ND STMATTAWA, WA 99349</text_data><comment_date>2018-07-12T00:00:00</comment_date></row><row _id="row-7p84.xhqa-qndw" _uuid="00000000-0000-0000-0A5D-55AC1BF72ACB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7p84.xhqa-qndw"><intent_id>588843</intent_id><project_id>718181</project_id><text_data>Tennis Court Surfacing</text_data><comment_date>2013-08-20T00:00:00</comment_date></row><row _id="row-p8py.zdqs-gg2e" _uuid="00000000-0000-0000-4DFA-8A6C71888994" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p8py.zdqs-gg2e"><intent_id>829015</intent_id><project_id>817751</project_id><text_data>General labor - assist operator, site clean up, etc.Other Truck - Water truck for dust control, lowboy for equipment mobilization, etc.</text_data><comment_date>2017-04-26T00:00:00</comment_date></row><row _id="row-khzd_yp5k_cuih" _uuid="00000000-0000-0000-952F-9E7E9235033D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-khzd_yp5k_cuih"><intent_id>519196</intent_id><project_id>690511</project_id><text_data>809912000</text_data><comment_date>2012-06-27T00:00:00</comment_date></row><row _id="row-7bs3.x6pb.rced" _uuid="00000000-0000-0000-C6B9-6BA2928FC9B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7bs3.x6pb.rced"><intent_id>853731</intent_id><project_id>826194</project_id><text_data>161597-   Per WAC 296-127-01378 Telecommunications Technician will be installing cabling fo telephones, computers and wireless access points (wireless data) for internet access.  Backbone cabling for connectivity between MDF and IDF.  Terminate, test and label.  Cables will run indoors.</text_data><comment_date>2017-08-09T00:00:00</comment_date></row><row _id="row-85ru~dtj2_5bkd" _uuid="00000000-0000-0000-8031-5AAAB3724529" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-85ru~dtj2_5bkd"><intent_id>1244781</intent_id><project_id>1019668</project_id><comment_date>2022-06-28T00:00:00</comment_date></row><row _id="row-x9yu.hxqa.5g96" _uuid="00000000-0000-0000-7DE4-9449932C07F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x9yu.hxqa.5g96"><intent_id>491709</intent_id><project_id>672763</project_id><text_data>** ALL WORK PERFOMRED OFF SITE AT WEST COAST MFG SHOP LOCATED AT 1515 75TH ST SW EVERETT, WA 98203</text_data><comment_date>2011-12-02T00:00:00</comment_date></row><row _id="row-psah-tywt-7z3a" _uuid="00000000-0000-0000-C9D0-AF951F349536" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-psah-tywt-7z3a"><intent_id>671686</intent_id><project_id>751648</project_id><text_data>THIS IS A SINGLE FAMILY RESIDENTIAL DWELLING.</text_data><comment_date>2014-12-31T00:00:00</comment_date></row><row _id="row-mcfs.begr_qkp3" _uuid="00000000-0000-0000-CEE0-10F5039761E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mcfs.begr_qkp3"><intent_id>887884</intent_id><project_id>838276</project_id><text_data>�	E2 Optics will terminate 72 strands of Corning single mode onto SC corning connectors. o	E2 Optics will test all terminated fiber. o	E2 Optics will ensure that all terminated fiber is labeled with to and from locations. o	At the head end fiber will land in 19� LIU. o	At the field locations the fiber will land in 16�x16� box provided by EC with a wall mount LIU mounted inside.</text_data><comment_date>2018-02-12T00:00:00</comment_date></row><row _id="row-fv5w_n3tq_nxus" _uuid="00000000-0000-0000-9142-CBDC4BA07A8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fv5w_n3tq_nxus"><intent_id>847795</intent_id><project_id>827279</project_id><text_data>Job #201908-002</text_data><comment_date>2017-07-17T00:00:00</comment_date></row><row _id="row-adfj~d5bu~gv9j" _uuid="00000000-0000-0000-AC70-900E21832141" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-adfj~d5bu~gv9j"><intent_id>719538</intent_id><project_id>699342</project_id><text_data>we thought Motorola was the Prime on this but I found out this is not the case. I could have filed my intent months ago! the work is already completed so as soon as this is approved.the technician built some cat6 cables, configured some deskset dispatch radios and connected the cables he built to each of the desksets installed. he labled cables, installed 15- amp breakers. tools used, wire cutters, crimping tools, drill.</text_data><comment_date>2015-09-09T00:00:00</comment_date></row><row _id="row-7czx~4hdc_wmeh" _uuid="00000000-0000-0000-5B1B-A4C216BD04B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7czx~4hdc_wmeh"><intent_id>774716</intent_id><project_id>791245</project_id><text_data>Filed by Alexsander Velit</text_data><comment_date>2016-07-13T00:00:00</comment_date></row><row _id="row-7fa6-2hu4.ebk4" _uuid="00000000-0000-0000-5BEE-43CC46FA5994" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7fa6-2hu4.ebk4"><intent_id>1085004</intent_id><project_id>931248</project_id><text_data>204943-001</text_data><comment_date>2020-09-01T00:00:00</comment_date></row><row _id="row-zrvd_s5ct.7b7r" _uuid="00000000-0000-0000-9439-895317EF82F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zrvd_s5ct.7b7r"><intent_id>779873</intent_id><project_id>798839</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2016-08-04T00:00:00</comment_date></row><row _id="row-5eah-5kxf.ep7i" _uuid="00000000-0000-0000-D7EA-81D2D4F2B22D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5eah-5kxf.ep7i"><intent_id>779472</intent_id><project_id>791749</project_id><text_data>4 schools</text_data><comment_date>2016-08-02T00:00:00</comment_date></row><row _id="row-j5v2_259s~7r24" _uuid="00000000-0000-0000-F8A4-DB54D63A571C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j5v2_259s~7r24"><intent_id>698192</intent_id><project_id>761391</project_id><text_data>Job # 102947-001 related to 20222-002</text_data><comment_date>2015-06-03T00:00:00</comment_date></row><row _id="row-x8p4.d64t_72id" _uuid="00000000-0000-0000-2033-4252CD9761C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x8p4.d64t_72id"><intent_id>1252473</intent_id><project_id>1023645</project_id><text_data>2:10Called out for two sinks backing up in the kitchen. Onsite contact stated he attempted to cable but could not get the line to drain due to grease. Ran 3/8 inch cable while running water in the 2 inch clean-out under the kitchen sink. Went out approximately 45 feet and the line drained. Ran water to test and the line draining properly at this time. Recommend using Pipe Shield. No guarantee due to the amount of grease in the line.</text_data><comment_date>2022-07-26T00:00:00</comment_date></row><row _id="row-dpn8_tbkh-qzz9" _uuid="00000000-0000-0000-7813-96E1BC8779E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpn8_tbkh-qzz9"><intent_id>700782</intent_id><project_id>754111</project_id><text_data>Truck &amp; Roadside Sprayer.  Controls are in vehicle so that the driver is spraying while the vehicle moves.</text_data><comment_date>2015-06-15T00:00:00</comment_date></row><row _id="row-g6sq-8jcx-zpg7" _uuid="00000000-0000-0000-83A2-754A6291C846" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g6sq-8jcx-zpg7"><intent_id>1022599</intent_id><project_id>899960</project_id><text_data>We are leveling the bioswale material with rakes after a truck blows it in.</text_data><comment_date>2019-11-19T00:00:00</comment_date></row><row _id="row-7dn5_b8hn-m4mb" _uuid="00000000-0000-0000-3A19-ABE3163D98E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7dn5_b8hn-m4mb"><intent_id>536108</intent_id><project_id>696523</project_id><text_data>Sent email:  Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance, cleaning, and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor).  For this Intent filing firms are to enter �Time and Materials� for  the dollar amount of the contract as an exact dollar amount cannot be identified at the time of filing. To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  When filing these forms, the dollar amount of the contract (which is the total amount that will be invoiced), including tax, will be entered on the form along with a short explanation in the notes section about the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring Street, Courthouse/First Avenue), so that the project can be tracked by the awarding agency and L&amp;I. In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures.  Please note that an on-call/blanket/annual contract may not be utilized for construction projects, new equipment purchase/installations, or for warranty work as these require their own set of Intent and Affidavit forms with the appropriate bid and award dates associated with those specific contracts.  The use of on-call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period and Affidavits will then be filed off of that new form.  In the notes section of the form, please indicate the duration of the contracting period (i.e., one year, two years, etc.) so we may ascertain that proper filing is taking place for the time period covered. If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out.  This form filing requirement also applies to owner/operators.  Please follow this filing method on any contracts covered under this policy.  (RCW 39.12.040) We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.  A link is provided below. http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp In addition, I wanted to provide some guidance that may be beneficial for the type of work you may be performing under this contract.  I noticed that the form was filed for Electronic Technicians only, however, I wanted to let you know that this classification has limitations; thus, other classifications may apply to some of this work depending upon the circumstances. Voice Over Distance - Telecommunication Technicians:http://apps.leg.wa.gov/WAC/default.aspx?cite=296-127-01378 Data Cabling - Electronic Technician:http://apps.leg.wa.gov/WAC/default.aspx?cite=296-127-01322: Fiber Optic/Other - Inside Wireman Electrician:http://apps.leg.wa.gov/WAC/default.aspx?cite=296-127-01323 Telecommunication Technicians and Electronic Technicians DO NOT install conduit, more than one inch in diameter and/or more than ten feet in length. They cannot pull wire through conduit runs of more than 10 feet, or install any conduit that will carry any regular voltage wiring.  They also do not pull wire through conduit they cannot install.  Wiremold raceway meets the definition of conduit. Electronic Technicians DO install non-metallic sheath cable of any length or size, provided the cable is installed for the specific purpose of carrying no more than low-voltage electricity for the following systems: Radio, television, and recording systems; devices for paging and intercommunication; public address, wired music, clocks, security and surveillance systems, and mobile radio systems;  and fire alarm and burglar systems.  Also, the installation of incidental shielded metallic conduit no longer than 10 feet and no larger than 1 inch, provided the conduit is installed for the specific purpose of carrying low-voltage wiring. Inside Wireman Electricians DO install metallic conduit longer than 10 feet or larger than 1 inch, regardless of whether it will carry regular voltage or low-voltage wiring.  Also, this scope of work specifically speaks to &amp;quot;The installation of conduit and interduct raceways for fiber optic cable and the pulling of fiber optic cable through these raceways, except for telephone conduit and cable.&amp;quot; If you have any questions, please contact me.</text_data><comment_date>2012-09-27T00:00:00</comment_date></row><row _id="row-xqjm_33gv.fs2c" _uuid="00000000-0000-0000-6F66-F46C92D81184" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xqjm_33gv.fs2c"><intent_id>1160223</intent_id><project_id>959065</project_id><text_data>*ECB Corp dba Omniduct**ECB Corp is a fabrication shop only and does not require a contractor�s license***All work is performed off-site in shop at 1515 75th St SW, Everett, WA</text_data><comment_date>2021-07-14T00:00:00</comment_date></row><row _id="row-i9v8-hgn2~556u" _uuid="00000000-0000-0000-E14B-F4EDBFD2CC24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9v8-hgn2~556u"><intent_id>831192</intent_id><project_id>819997</project_id><text_data>Nordic Job # 17944</text_data><comment_date>2017-05-05T00:00:00</comment_date></row><row _id="row-qj3v~rwjk_xax2" _uuid="00000000-0000-0000-6CA1-4836B25EB7A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qj3v~rwjk_xax2"><intent_id>587734</intent_id><project_id>717795</project_id><text_data>Installation of indoor copper telecommunications cabling.</text_data><comment_date>2013-08-14T00:00:00</comment_date></row><row _id="row-7ki6.z6hz~3s5e" _uuid="00000000-0000-0000-E357-ED670E6871CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ki6.z6hz~3s5e"><intent_id>535694</intent_id><project_id>696391</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-09-27T00:00:00</comment_date></row><row _id="row-sywb~9n3a~f8hk" _uuid="00000000-0000-0000-1151-65996DDE71AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sywb~9n3a~f8hk"><intent_id>1488404</intent_id><project_id>1135227</project_id><text_data>Salish Networks is a 100% Tulalip Tribes owned company located within the bounds of the Tulalip Reservation. The Tulalip Tribes, Tulalip Tribal Enterprises and Tulalip Tribal Employees are exempt from Washington State Workers Compensation Insurance Requirements. All employees are covered by Amerind Insurance. Work will be conducted inside and on the customer side of phone/data demark. Installation will include Network cabling to support voice and data application, CCTV Applications and Access Control wiring.A copy of Insurance coverage certification may be provided upon request by emailing Salish Networks at info@salishnetworks.com or calling 360-716-8000.</text_data><comment_date>2024-11-25T00:00:00</comment_date></row><row _id="row-rqzi~nvca_zd67" _uuid="00000000-0000-0000-CDFF-533C900041A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rqzi~nvca_zd67"><intent_id>1497837</intent_id><project_id>1159048</project_id><text_data>McClure Brothers Scope of work.Demolition, Earthwork, Formwork, Concrete, Finish Carpentry</text_data><comment_date>2024-12-31T00:00:00</comment_date></row><row _id="row-dy75.29h8_p9x8" _uuid="00000000-0000-0000-806A-CC6AB3D03DA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dy75.29h8_p9x8"><intent_id>1509026</intent_id><project_id>1170115</project_id><text_data>Order 280773</text_data><comment_date>2025-02-11T00:00:00</comment_date></row><row _id="row-h6df.3ak3.ng3q" _uuid="00000000-0000-0000-A414-712ACDE2BF8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h6df.3ak3.ng3q"><intent_id>1005212</intent_id><project_id>892453</project_id><text_data>#1 - Describe the work that your firm was contracted to perform INSULATION #2 - Is the structure a single family dwelling YES, duplex NO , apartment YES, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have 3 #4 - What is the building used for? --Answer 'yes' or 'no' to each of the following options:(a) Any commercial use in the structure? NO  (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO  (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? YES #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2019-09-06T00:00:00</comment_date></row><row _id="row-256b_jz37-vmg4" _uuid="00000000-0000-0000-9037-AE2333E8055B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-256b_jz37-vmg4"><intent_id>1171488</intent_id><project_id>878466</project_id><text_data>Hiring Contractor RailWorks Track Systems Intent# 1170856</text_data><comment_date>2021-08-23T00:00:00</comment_date></row><row _id="row-vae5-kv2q_sxzq" _uuid="00000000-0000-0000-7DB8-DF7E300DB40A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vae5-kv2q_sxzq"><intent_id>668837</intent_id><project_id>747094</project_id><text_data>Install Insulation, SIngle Family, Single Story, No, No, Yes, No, No, No, No, No, No, No, No, Yes, Yes, No, No.</text_data><comment_date>2014-12-08T00:00:00</comment_date></row><row _id="row-sixx-w4gg.avq3" _uuid="00000000-0000-0000-2EBB-A8D2DC4B5CCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sixx-w4gg.avq3"><intent_id>826639</intent_id><project_id>818143</project_id><text_data>Filed by Eugene Tufts</text_data><comment_date>2017-04-14T00:00:00</comment_date></row><row _id="row-w63m~7h28-99yp" _uuid="00000000-0000-0000-6E26-387691128B69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w63m~7h28-99yp"><intent_id>694555</intent_id><project_id>761190</project_id><text_data>Oregon Workman&amp;#39;s Compensation SAIF Policy #812940</text_data><comment_date>2015-05-14T00:00:00</comment_date></row><row _id="row-g2c6.793b.m6zv" _uuid="00000000-0000-0000-7EE9-B3F4AAE6E3AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g2c6.793b.m6zv"><intent_id>829610</intent_id><project_id>819362</project_id><text_data>Landlord:Carrington Co. Contact: Brandon Bailey  Phone 707-444-7720   Carrington is paying for the entire project. No state funds.</text_data><comment_date>2017-04-28T00:00:00</comment_date></row><row _id="row-ha5n-zf7i-y49t" _uuid="00000000-0000-0000-E6E7-136B31334AAF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ha5n-zf7i-y49t"><intent_id>985341</intent_id><project_id>884558</project_id><text_data>Prevailing wage rate basis used based upon published rate for the date of install of 06/05/19 and 06/06/19 as provided on the WA DOL Prevailing Wage Web Site</text_data><comment_date>2019-06-17T00:00:00</comment_date></row><row _id="row-99v3_8yjn_ga5j" _uuid="00000000-0000-0000-A863-342EF9207257" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-99v3_8yjn_ga5j"><intent_id>572058</intent_id><project_id>690617</project_id><text_data>Herbicide application prior to Asphalt PavingSpayer mounted on flat bed 1-ton truck</text_data><comment_date>2013-05-29T00:00:00</comment_date></row><row _id="row-fzes_umsk_4yzi" _uuid="00000000-0000-0000-13A1-095FFE1338D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fzes_umsk_4yzi"><intent_id>536569</intent_id><project_id>696679</project_id><text_data>Straw, seeding, pumps for water diversion</text_data><comment_date>2012-09-25T00:00:00</comment_date></row><row _id="row-upkw_75p9.qbiw" _uuid="00000000-0000-0000-0973-0F6EB435561E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-upkw_75p9.qbiw"><intent_id>1096667</intent_id><project_id>869454</project_id><text_data>I Have Worker's Comp. with SAIF</text_data><comment_date>2021-06-08T00:00:00</comment_date></row><row _id="row-bwi4-a8r3_pk8n" _uuid="00000000-0000-0000-DCB8-CF71AA705C6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bwi4-a8r3_pk8n"><intent_id>753535</intent_id><project_id>788212</project_id><text_data>Planting and 5 year maintenance of 4 trees at sites mentioned above</text_data><comment_date>2016-03-28T00:00:00</comment_date></row><row _id="row-ssdc_8aca_cn8c" _uuid="00000000-0000-0000-B2AC-F03A6B287B0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ssdc_8aca_cn8c"><intent_id>949291</intent_id><project_id>856217</project_id><text_data>Truck is an F550 used to transport equipment and material to and from the job site</text_data><comment_date>2018-12-05T00:00:00</comment_date></row><row _id="row-qjz4_f872-dt7j" _uuid="00000000-0000-0000-BAC1-A1CA9D1163B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qjz4_f872-dt7j"><intent_id>1220936</intent_id><project_id>1005560</project_id><text_data>LE 2203098</text_data><comment_date>2022-03-25T00:00:00</comment_date></row><row _id="row-8fzf.unwd_pufu" _uuid="00000000-0000-0000-7566-F8104EC167BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8fzf.unwd_pufu"><intent_id>906384</intent_id><project_id>849366</project_id><text_data>We hired Speer Taps as a sub-tier contractor. HD Fowler didn&amp;#39;t perform any work at all.</text_data><comment_date>2018-05-22T00:00:00</comment_date></row><row _id="row-d2hw~emmc_ex6k" _uuid="00000000-0000-0000-EC29-F1C04321A201" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d2hw~emmc_ex6k"><intent_id>502803</intent_id><project_id>683725</project_id><text_data>Form filed by : Ron Bishop - murq235</text_data><comment_date>2012-03-06T00:00:00</comment_date></row><row _id="row-a5is~ry6i_b3uj" _uuid="00000000-0000-0000-8633-E07259443D82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5is~ry6i_b3uj"><intent_id>883924</intent_id><project_id>837533</project_id><text_data>0918007</text_data><comment_date>2018-01-18T00:00:00</comment_date></row><row _id="row-girt~stcj-qm8b" _uuid="00000000-0000-0000-A288-ADC631D6BEBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-girt~stcj-qm8b"><intent_id>512597</intent_id><project_id>687912</project_id><text_data>The General Laborer will be running errands and doing clean up in the shack area.  At no time will the laborer be in a position to be harnessed off with the Ironworkers.</text_data><comment_date>2012-05-21T00:00:00</comment_date></row><row _id="row-zn8d~w3ib.2u94" _uuid="00000000-0000-0000-4725-51518F39DB65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zn8d~w3ib.2u94"><intent_id>1263660</intent_id><project_id>1029387</project_id><text_data>VE # 16879</text_data><comment_date>2022-09-02T00:00:00</comment_date></row><row _id="row-hb77.jkbm.9sdj" _uuid="00000000-0000-0000-A97F-A6BC1AFCDFFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hb77.jkbm.9sdj"><intent_id>939257</intent_id><project_id>863829</project_id><text_data>Maint 09-01-18 thru 03-01-18</text_data><comment_date>2018-10-15T00:00:00</comment_date></row><row _id="row-e8wz_t3xt-fcpf" _uuid="00000000-0000-0000-F566-6AF35E8B3C42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e8wz_t3xt-fcpf"><intent_id>718491</intent_id><project_id>769325</project_id><text_data>T.W. Clark Construction hired us</text_data><comment_date>2015-09-02T00:00:00</comment_date></row><row _id="row-ec9u_m9s9~dqpj" _uuid="00000000-0000-0000-AB9E-86897ACDF5AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ec9u_m9s9~dqpj"><intent_id>680229</intent_id><project_id>756144</project_id><text_data>Laborers-General:  Workers performing manual labor with manual tools (shovels, rakes, hoes)Other Trucks:  Water Trucks &amp;lt; 4,000 gal used for dust control</text_data><comment_date>2015-02-20T00:00:00</comment_date></row><row _id="row-zy6u_kcjj.9axi" _uuid="00000000-0000-0000-A167-67AC738ACD3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zy6u_kcjj.9axi"><intent_id>825213</intent_id><project_id>808367</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR &amp; WATER TRUCK</text_data><comment_date>2017-04-07T00:00:00</comment_date></row><row _id="row-tib9-gwfw.igrq" _uuid="00000000-0000-0000-1D88-663E8904D5F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tib9-gwfw.igrq"><intent_id>612801</intent_id><project_id>689307</project_id><text_data>We do not have industrial insurance account in WA since we are there on a temporary basis. We have Oregon Workers Comp Insurance (Saif Policy #439059) and stop gap liability.</text_data><comment_date>2014-01-20T00:00:00</comment_date></row><row _id="row-4jqm_2yaz-f6dm" _uuid="00000000-0000-0000-BD5F-BA6687EAD78D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4jqm_2yaz-f6dm"><intent_id>1067212</intent_id><project_id>923204</project_id><text_data>9850183</text_data><comment_date>2020-06-23T00:00:00</comment_date></row><row _id="row-hf6r.7mm3.iyi4" _uuid="00000000-0000-0000-4478-1EFCEDD1442B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hf6r.7mm3.iyi4"><intent_id>764002</intent_id><project_id>791515</project_id><text_data>Fringe: hourly pension $7.75, hourly medical $9.08, hourly vacation$2.38 hourly holiday $1.20, approved apprentice program $.60</text_data><comment_date>2016-05-24T00:00:00</comment_date></row><row _id="row-sbum_sqrg_sd8v" _uuid="00000000-0000-0000-553C-67193B8C701E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sbum_sqrg_sd8v"><intent_id>1282391</intent_id><project_id>1040187</project_id><text_data>Preparation work for installation of ladder rack and 25 pair telephone cabling infrastructure.All work done within the existing building.</text_data><comment_date>2022-11-09T00:00:00</comment_date></row><row _id="row-xdwa.vsyw~ynkk" _uuid="00000000-0000-0000-E056-E155606A23ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdwa.vsyw~ynkk"><intent_id>1026590</intent_id><project_id>901851</project_id><text_data>MMFS Job#76199180</text_data><comment_date>2019-12-12T00:00:00</comment_date></row><row _id="row-bmc5.pre8_m5bw" _uuid="00000000-0000-0000-E133-D0E830C89E67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmc5.pre8_m5bw"><intent_id>635159</intent_id><project_id>737128</project_id><text_data>This project is residential</text_data><comment_date>2014-06-16T00:00:00</comment_date></row><row _id="row-4nxh.yamy.8wei" _uuid="00000000-0000-0000-5291-4956625B0B88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4nxh.yamy.8wei"><intent_id>1083353</intent_id><project_id>930467</project_id><text_data>SE6181</text_data><comment_date>2020-08-26T00:00:00</comment_date></row><row _id="row-772t-iaaw.xuhj" _uuid="00000000-0000-0000-8933-CA01B0FB19A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-772t-iaaw.xuhj"><intent_id>751935</intent_id><project_id>787464</project_id><text_data>1) Fixed a leak on a 3&amp;quot; and 2&amp;quot; abs lines (shower, toilet and lav sinks) Drain lines. 2)Apartments 3)unknown 4)A: no B: No C:Yes D:no E: no F: no G; no H: no I:no J:yes  5) yes 6) yes 7) yes 8) no</text_data><comment_date>2016-03-17T00:00:00</comment_date></row><row _id="row-tn7y~5y5i.67ez" _uuid="00000000-0000-0000-C855-FF4E2E0C8D07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tn7y~5y5i.67ez"><intent_id>625350</intent_id><project_id>733054</project_id><text_data>THIS FORM IS BEING RE-USED FOR A PROJECT THAT IS NO HUD Housing</text_data><comment_date>2014-05-13T00:00:00</comment_date></row><row _id="row-zx3t~ayia-jyam" _uuid="00000000-0000-0000-9F83-E04E33223FFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zx3t~ayia-jyam"><intent_id>1202598</intent_id><project_id>993885</project_id><text_data>Haz Waste workers to clear/clean areas using shovels/rakes/brooms/rags/sponges/mopsMotor Pat Graders to vacuum areas of all contaminated liquids</text_data><comment_date>2022-01-05T00:00:00</comment_date></row><row _id="row-hfnz.gb2c-etsy" _uuid="00000000-0000-0000-E650-657BD879339B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hfnz.gb2c-etsy"><intent_id>848062</intent_id><project_id>827384</project_id><text_data>302436</text_data><comment_date>2017-07-18T00:00:00</comment_date></row><row _id="row-3fdu~tycg-m3s8" _uuid="00000000-0000-0000-BF56-FAF0053E8252" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3fdu~tycg-m3s8"><intent_id>1062995</intent_id><project_id>878550</project_id><text_data>Providing hydroseeding only</text_data><comment_date>2020-06-05T00:00:00</comment_date></row><row _id="row-iwah~ikaw_k6j7" _uuid="00000000-0000-0000-1D6E-4F81830C0B6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iwah~ikaw_k6j7"><intent_id>884505</intent_id><project_id>841984</project_id><text_data>1. REPLACE HEATERS2. SINGLE FAMILY3. SINGLE STORY4A NO4B NO4C YES4D NO4E NO4F NO4G NO4H NO4J NO5 YES6 YES7 NO8 NO</text_data><comment_date>2018-01-22T00:00:00</comment_date></row><row _id="row-vr67-7h3r-7922" _uuid="00000000-0000-0000-EB91-78F04D47792D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vr67-7h3r-7922"><intent_id>598831</intent_id><project_id>721048</project_id><text_data>073071</text_data><comment_date>2013-10-10T00:00:00</comment_date></row><row _id="row-yf3x_bem9-a7p3" _uuid="00000000-0000-0000-9338-FF8A8A695905" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yf3x_bem9-a7p3"><intent_id>982897</intent_id><project_id>870556</project_id><text_data>Install aged hemlock barkdust in the playground area using specialized blowing trucks and hand labor</text_data><comment_date>2019-06-06T00:00:00</comment_date></row><row _id="row-6ivv_8zpj-9qbk" _uuid="00000000-0000-0000-C269-1766C07338D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ivv_8zpj-9qbk"><intent_id>960318</intent_id><project_id>870214</project_id><text_data>0819010</text_data><comment_date>2019-02-14T00:00:00</comment_date></row><row _id="row-s4uz-6y3m-2hsi" _uuid="00000000-0000-0000-6D7A-29C614123ED6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4uz-6y3m-2hsi"><intent_id>608662</intent_id><project_id>725705</project_id><text_data>Crane/lift repair and troubleshoot will use all basic tools and standard repair truck</text_data><comment_date>2014-01-02T00:00:00</comment_date></row><row _id="row-99uj_kg4n_z5ih" _uuid="00000000-0000-0000-B57D-8D7BCB932815" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-99uj_kg4n_z5ih"><intent_id>897816</intent_id><project_id>847997</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.</text_data><comment_date>2018-04-10T00:00:00</comment_date></row><row _id="row-6esz-83at_bu22" _uuid="00000000-0000-0000-2B92-2B1C35A73827" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6esz-83at_bu22"><intent_id>666713</intent_id><project_id>749002</project_id><text_data>301859</text_data><comment_date>2014-11-20T00:00:00</comment_date></row><row _id="row-andu_fpbt~m3b5" _uuid="00000000-0000-0000-5B00-02EA37B05012" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-andu_fpbt~m3b5"><intent_id>624712</intent_id><project_id>729030</project_id><text_data>Hiring Contractor - Country Construction (WA UBI# 602862308)SimplexGrinnell - Our WA UBI# 602113334)</text_data><comment_date>2014-04-14T00:00:00</comment_date></row><row _id="row-6cif~gef2-b4qm" _uuid="00000000-0000-0000-64CE-D34DCA045FFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6cif~gef2-b4qm"><intent_id>710438</intent_id><project_id>741211</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2015-07-29T00:00:00</comment_date></row><row _id="row-j5m7~z5kf_zfwj" _uuid="00000000-0000-0000-3AF7-71E755B8BDBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j5m7~z5kf_zfwj"><intent_id>1492786</intent_id><project_id>1159964</project_id><text_data>436814 PSESD Renton Elevator Shunt Trip Test</text_data><comment_date>2024-12-06T00:00:00</comment_date></row><row _id="row-3fy7-kqm7.5h5s" _uuid="00000000-0000-0000-E5D9-444F1244E1E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3fy7-kqm7.5h5s"><intent_id>715303</intent_id><project_id>769859</project_id><text_data>Fringe Benefits:$ 2.00 I.A.P.$ 5.51 Pension$ 0.12 Occ. Health$ 8.84 Health &amp; Welfare$ 1.00 Apprenticeship$ 0.10 Industry Fund$ 0.05 LMCT_______$ 17.62 Tota</text_data><comment_date>2015-08-19T00:00:00</comment_date></row><row _id="row-7dhz_pt8f.k6zq" _uuid="00000000-0000-0000-6F61-32DB9008FE64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7dhz_pt8f.k6zq"><intent_id>599064</intent_id><project_id>718633</project_id><text_data>Filed by Pete Arsenault</text_data><comment_date>2013-10-11T00:00:00</comment_date></row><row _id="row-2krt.7r9s.ye6j" _uuid="00000000-0000-0000-F63E-95FAC39312DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2krt.7r9s.ye6j"><intent_id>1038219</intent_id><project_id>908335</project_id><text_data>JOURNEY LEVEL ELECTRICIAN-WAGE $46.05 + FRINGE $21.52</text_data><comment_date>2020-02-13T00:00:00</comment_date></row><row _id="row-678f~nymf-yx2s" _uuid="00000000-0000-0000-7ACC-6FD11C22D3F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-678f~nymf-yx2s"><intent_id>1262475</intent_id><project_id>1028758</project_id><text_data>Owner used excavator, second owner was laborer</text_data><comment_date>2022-08-30T00:00:00</comment_date></row><row _id="row-hyeq.s2is_pwgf" _uuid="00000000-0000-0000-723B-7C76109BD87D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hyeq.s2is_pwgf"><intent_id>1292695</intent_id><project_id>1046611</project_id><text_data>Please note that if claimed Vacation Pay is employee-paid through a deduction from gross wages, it may not be claimed as a fringe benefit credit. Workers must be reimbursed for any wage underpayments due to this ineligible fringe benefit credit. Please note that deductions from workers� paychecks such as union dues, assessments, or �check-off� are not usual benefits and cannot be claimed as fringe benefit credits.Approval of Intent or Affidavit is based upon information provided by the contractor and does not signify approval of trade classifications or fringe benefits claimed.</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-5zt5~kqza.6x6f" _uuid="00000000-0000-0000-C2F4-E525D72B9B14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5zt5~kqza.6x6f"><intent_id>1231399</intent_id><project_id>1011890</project_id><text_data>#1-We were contracted to REPLACE the furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2022-05-05T00:00:00</comment_date></row><row _id="row-xhj4.fmuk.e3zt" _uuid="00000000-0000-0000-CD2A-F448BF02E00A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xhj4.fmuk.e3zt"><intent_id>974102</intent_id><project_id>879544</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install horizontal cable for voice / data communications. Terminate cables in the equipment room</text_data><comment_date>2019-04-26T00:00:00</comment_date></row><row _id="row-mw7k~6ajb_i7rt" _uuid="00000000-0000-0000-7AE6-7726D9D81E0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mw7k~6ajb_i7rt"><intent_id>688010</intent_id><project_id>759503</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2015-04-08T00:00:00</comment_date></row><row _id="row-estv-3t2r-rajj" _uuid="00000000-0000-0000-4FC4-9C0E18B0865B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-estv-3t2r-rajj"><intent_id>555041</intent_id><project_id>691509</project_id><text_data>Jadco, Inc. will be hauling Asphalt</text_data><comment_date>2013-02-06T00:00:00</comment_date></row><row _id="row-fb2w.ehvh~yuzn" _uuid="00000000-0000-0000-1882-7370B2BFC868" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fb2w.ehvh~yuzn"><intent_id>1317016</intent_id><project_id>1061758</project_id><text_data>THE TRUCK DRIVER RATE IS PAID TO EMPLOYEES WHILE DRIVING COMPANY ISSUED CARGO VANS AND/OR MEDIUM-SIZED PICKUP TRUCKS TO TRANSPORT MATERIALS/SUPPLIES TO THE JOB SITE.</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-mkyi-6wb5.jyy8" _uuid="00000000-0000-0000-5DB7-16F7C26D8DA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mkyi-6wb5.jyy8"><intent_id>1302878</intent_id><project_id>1042115</project_id><text_data>Irrigation mainline discovery and repair work at Cascadia tech. We will be using rakes, shovels, Excavator (Kubota model U17 15HP 3700lbs).</text_data><comment_date>2023-02-09T00:00:00</comment_date></row><row _id="row-wjxw~u5hn-5saf" _uuid="00000000-0000-0000-CF7E-C24C63A4993E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wjxw~u5hn-5saf"><intent_id>1302878</intent_id><project_id>1042115</project_id><text_data>Mainline was 18 inches deep. 3 feet was dug to connect mainline with 3' pvc pipe</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-ptmx-r8te.hd8k" _uuid="00000000-0000-0000-397B-5CBD80578BA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ptmx-r8te.hd8k"><intent_id>1316971</intent_id><project_id>1032261</project_id><text_data>Other Truck - Equipment Haul using Kenworth a 6x4 Bogie Axle 56,000 GVW Diesel</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-2nx4-fsst.bvxy" _uuid="00000000-0000-0000-D4AF-FCD8CE101813" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2nx4-fsst.bvxy"><intent_id>1318529</intent_id><project_id>1062674</project_id><text_data>Install data lines for new furnitureinside workelect tech(06)LAN(local area network)AV</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-9z9r.krvq-arjf" _uuid="00000000-0000-0000-244A-89567CF9E6B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9z9r.krvq-arjf"><intent_id>1318723</intent_id><project_id>1059236</project_id><text_data>SPM# 27240</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-6vnr~dg7j.37nr" _uuid="00000000-0000-0000-96D0-1F096568EB4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6vnr~dg7j.37nr"><intent_id>1073268</intent_id><project_id>922694</project_id><text_data>Mobilization, Topsoil 2' Thick, hydroseeding, so0d irrigation sleeves and R&amp;R existing sprinkler.  We will use irrigation materials seed sod.  Tools will include a bobcat skid steer as well as misc hand tools</text_data><comment_date>2020-07-17T00:00:00</comment_date></row><row _id="row-c6jd~tjj2~3nde" _uuid="00000000-0000-0000-0E67-0AABE63A5F25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6jd~tjj2~3nde"><intent_id>693469</intent_id><project_id>761823</project_id><text_data>(1) INSULATION, (2) SINGLE FAMILY DWELLING, (3) 1-2 (4) A-NO B-NO C-YES D-NO E-NO F-NO G-NO H-NO I-NO J-NO K-? (5) YES (6) YES (7)NO (8)NO</text_data><comment_date>2015-05-08T00:00:00</comment_date></row><row _id="row-aq5g~yxzg-x9mk" _uuid="00000000-0000-0000-75C2-E8A5E90070D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aq5g~yxzg-x9mk"><intent_id>553997</intent_id><project_id>700952</project_id><text_data>Form filed by: David F Wells JrGeneral Laborer: Sweeping, shoveling, broom, shovel</text_data><comment_date>2013-02-28T00:00:00</comment_date></row><row _id="row-h8zj-zrsw.8wtu" _uuid="00000000-0000-0000-198B-DB2F70E02556" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h8zj-zrsw.8wtu"><intent_id>969348</intent_id><project_id>877287</project_id><text_data>Our scope of work includes seeding, plant installation, composting, soil amendments and bark muclh installation.</text_data><comment_date>2019-04-03T00:00:00</comment_date></row><row _id="row-mpvp~3vwa.jq6k" _uuid="00000000-0000-0000-44F5-DC78E6AD2406" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpvp~3vwa.jq6k"><intent_id>715073</intent_id><project_id>770172</project_id><text_data>Blythe job #S-622Repair domestic water pipe in mechanical mezzanine</text_data><comment_date>2015-08-18T00:00:00</comment_date></row><row _id="row-r29f_d2q9.fbjm" _uuid="00000000-0000-0000-C621-B3DEE54EC072" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r29f_d2q9.fbjm"><intent_id>716967</intent_id><project_id>770886</project_id><text_data>MMFS Job#73156474</text_data><comment_date>2015-08-26T00:00:00</comment_date></row><row _id="row-yje5_z5j5_8ce2" _uuid="00000000-0000-0000-563F-61B02EC60B85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yje5_z5j5_8ce2"><intent_id>1101445</intent_id><project_id>932850</project_id><text_data>v</text_data><comment_date>2020-11-05T00:00:00</comment_date></row><row _id="row-qp6f~j72x_wp7f" _uuid="00000000-0000-0000-348B-83C0D4314079" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qp6f~j72x_wp7f"><intent_id>678481</intent_id><project_id>727078</project_id><text_data>Fringe: health $4.81/hr, 401K $11.95/hr</text_data><comment_date>2015-02-09T00:00:00</comment_date></row><row _id="row-tyy9.xpsx~5bx8" _uuid="00000000-0000-0000-928B-679828A2EF17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tyy9.xpsx~5bx8"><intent_id>820170</intent_id><project_id>815372</project_id><text_data>Filed by Cindy J. Paul.</text_data><comment_date>2017-03-10T00:00:00</comment_date></row><row _id="row-5aep_yvba-x2xj" _uuid="00000000-0000-0000-8136-68E71AB0802E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5aep_yvba-x2xj"><intent_id>803955</intent_id><project_id>807915</project_id><text_data>City of Vancouver JOC Contract</text_data><comment_date>2016-11-22T00:00:00</comment_date></row><row _id="row-2whi_pzcb~r4ch" _uuid="00000000-0000-0000-11AF-DC24435CBBEE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2whi_pzcb~r4ch"><intent_id>1032682</intent_id><project_id>887382</project_id><text_data>PN # 86305 SEA</text_data><comment_date>2020-01-20T00:00:00</comment_date></row><row _id="row-hvzi.9sue_c7hb" _uuid="00000000-0000-0000-F668-96B67DD88499" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hvzi.9sue_c7hb"><intent_id>1199659</intent_id><project_id>992018</project_id><text_data>Truck Driver Other - vehicle is Ford Transit van, driver is stone countertop installer</text_data><comment_date>2022-01-06T00:00:00</comment_date></row><row _id="row-zmys-cqpv~ywvv" _uuid="00000000-0000-0000-44CC-44320D78E5AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zmys-cqpv~ywvv"><intent_id>974941</intent_id><project_id>873931</project_id><text_data>Snow Plow Snow in parking lotEquipment is Snow Plow and skid steer.</text_data><comment_date>2019-04-30T00:00:00</comment_date></row><row _id="row-gav2_h462.dvzf" _uuid="00000000-0000-0000-337C-30EA7A30BBC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gav2_h462.dvzf"><intent_id>1071600</intent_id><project_id>925069</project_id><text_data>The contract amount of $3355.93 is incorrect. The correct amount is $3241.66. Change requested by Nathan Eterno and Clark County Facilities.</text_data><comment_date>2020-10-21T00:00:00</comment_date></row><row _id="row-32uk_fft5~ar92" _uuid="00000000-0000-0000-176A-E1BD2BB72D93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-32uk_fft5~ar92"><intent_id>869823</intent_id><project_id>830288</project_id><text_data>The type of system will be SD Cameras. Install, terminate, and test (15) CAT6 patch cords used to extend from existing location to new location per print. Install (13) 1&amp;quot; sleeves. Drill (3) cores for exterior cameras. Provide RJ45 mod ends for CAT6 cable. Utilize existing pathways. Work will be completed both indoors and outdoors.</text_data><comment_date>2017-10-18T00:00:00</comment_date></row><row _id="row-45hf_r7ay.ed3w" _uuid="00000000-0000-0000-EC8E-7DEF37DBA617" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-45hf_r7ay.ed3w"><intent_id>464521</intent_id><project_id>669555</project_id><text_data>STACIA HARPERMARCIA HILDRETH</text_data><comment_date>2011-07-07T00:00:00</comment_date></row><row _id="row-mk96.x7t4-6mta" _uuid="00000000-0000-0000-3F14-0491260E29FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mk96.x7t4-6mta"><intent_id>625525</intent_id><project_id>729067</project_id><text_data>Form filed by: Joseph Poe</text_data><comment_date>2014-04-18T00:00:00</comment_date></row><row _id="row-rkh4~bqem~fjrx" _uuid="00000000-0000-0000-7AC6-C4BB8FBF1DC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rkh4~bqem~fjrx"><intent_id>472577</intent_id><project_id>672452</project_id><text_data>Other Truck is the crew truck (3/4 ton or 1 ton pick ups) and the 2 ton landscape truck. General Laborer for our scope is Erosion Control Duties and misc. clean-up. Tools used are shovel and broom (hand tools)</text_data><comment_date>2011-09-01T00:00:00</comment_date></row><row _id="row-9kh4-in47-megn" _uuid="00000000-0000-0000-1637-495333055D35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9kh4-in47-megn"><intent_id>1005735</intent_id><project_id>892595</project_id><text_data>This is a storm drainage pond, that has a liner.  Contractor will be excavating out dirt from this area and creating a pond. We are planting 3,100 one gallon plants in this pond area, and then hydroseeding all dirt areas that have been disturbed.</text_data><comment_date>2019-09-30T00:00:00</comment_date></row><row _id="row-xq77.b43h-n6ty" _uuid="00000000-0000-0000-E17B-57FC4C6A29C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xq77.b43h-n6ty"><intent_id>1037765</intent_id><project_id>880037</project_id><comment_date>2020-02-12T00:00:00</comment_date></row><row _id="row-psah.wdpf_dqzm" _uuid="00000000-0000-0000-576E-0C46A2E13CD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-psah.wdpf_dqzm"><intent_id>1105540</intent_id><project_id>918575</project_id><text_data>1200053 - KSD Meridian Elementary Multipurpose Room First part of Job is with Insulation Contractors intent number 1061513, Insulation Contractors was acquired by Insulation Contractors of WA on 10.12.2020.</text_data><comment_date>2020-11-24T00:00:00</comment_date></row><row _id="row-ix48.i9fs_2vbw" _uuid="00000000-0000-0000-7D32-BDFAE37EBC86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ix48.i9fs_2vbw"><intent_id>885020</intent_id><project_id>842204</project_id><text_data>Repair HVAC equipment for the above addresses. Used a van to get there, and various HVAC tools as needed.</text_data><comment_date>2018-02-20T00:00:00</comment_date></row><row _id="row-692w~j2ug-hcpa" _uuid="00000000-0000-0000-CBCA-19C9977097FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-692w~j2ug-hcpa"><intent_id>528594</intent_id><project_id>693882</project_id><text_data>Earthcorps work on this project is for environmental and trail maintenance work performed by conservation corps members exempt from payment of prevailing wage rates pursuant to SB 5538</text_data><comment_date>2012-08-15T00:00:00</comment_date></row><row _id="row-m2c2.t7t6-ct46" _uuid="00000000-0000-0000-DBBD-2CAB244B5CE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2c2.t7t6-ct46"><intent_id>519841</intent_id><project_id>690746</project_id><text_data>Purcell #12140</text_data><comment_date>2012-06-29T00:00:00</comment_date></row><row _id="row-8zip-ipq8-stmh" _uuid="00000000-0000-0000-4A53-719AF69F4D89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zip-ipq8-stmh"><intent_id>1171909</intent_id><project_id>966316</project_id><text_data>We are a subcontractor for FieldTurf. They have been hired to improve the athletic surfaces at East Valley High School. We are power washing the existing track surface with a power washer and then resurface the track with a rubber-like synthetic surface.  Once we make sure the track surface is safe, we will spray paint lines on the track for lanes and track events. Our crew uses tools like a power washer, shovels, rakes, brooks and wheelbarrows to move the rubber. We also use scissors and tape for masking areas to keep the other surfaces clean.</text_data><comment_date>2021-08-24T00:00:00</comment_date></row><row _id="row-6kaf-4uzw.w2p4" _uuid="00000000-0000-0000-5C72-BAF0E5A1D3F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6kaf-4uzw.w2p4"><intent_id>679336</intent_id><project_id>755764</project_id><text_data>Industrial Insurance is with Idaho State Insurance Fund Policy #523384</text_data><comment_date>2015-02-14T00:00:00</comment_date></row><row _id="row-5vhp.q8k4.qak9" _uuid="00000000-0000-0000-2878-2EA969D4A090" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vhp.q8k4.qak9"><intent_id>598077</intent_id><project_id>721515</project_id><text_data>Post and Pre=emergent spray work, fertilizer and weed control, and liquid moss control.  Exhibits B, F, H and I.</text_data><comment_date>2013-10-07T00:00:00</comment_date></row><row _id="row-attw~axxs~z6a6" _uuid="00000000-0000-0000-7D65-20725ABAEAB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-attw~axxs~z6a6"><intent_id>647653</intent_id><project_id>736173</project_id><text_data>Job # 632789</text_data><comment_date>2014-08-13T00:00:00</comment_date></row><row _id="row-uadx-zejy-n4nt" _uuid="00000000-0000-0000-6E83-3CC771D7D0F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uadx-zejy-n4nt"><intent_id>774922</intent_id><project_id>797015</project_id><text_data>WRS Job #P16-232PW</text_data><comment_date>2016-07-14T00:00:00</comment_date></row><row _id="row-6jtz_t3p7.56sp" _uuid="00000000-0000-0000-229D-7E5A5E4A850E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6jtz_t3p7.56sp"><intent_id>949384</intent_id><project_id>868061</project_id><text_data>Filed by Terry Gage</text_data><comment_date>2018-12-06T00:00:00</comment_date></row><row _id="row-4msb.cg92~fgur" _uuid="00000000-0000-0000-F4BE-B4148DBE8DB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4msb.cg92~fgur"><intent_id>734934</intent_id><project_id>776574</project_id><text_data>The duties to be performed by the General Laborer are as follows: Demolish walls as noted on the demolition prints. Demolish cove base associated with the carpet. Tools to be used by the General Laborer are as follows: Sledge hammer, hammer, sawzall.</text_data><comment_date>2015-12-03T00:00:00</comment_date></row><row _id="row-zf99~c4v7.wzh5" _uuid="00000000-0000-0000-2976-2B4E432176B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zf99~c4v7.wzh5"><intent_id>822546</intent_id><project_id>816423</project_id><text_data>Will be installing cables that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-03-24T00:00:00</comment_date></row><row _id="row-ugd6.zest-avak" _uuid="00000000-0000-0000-ACE8-72D853537780" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ugd6.zest-avak"><intent_id>488312</intent_id><project_id>672712</project_id><text_data>Fire system, security system installations</text_data><comment_date>2011-12-01T00:00:00</comment_date></row><row _id="row-gqvt_76ba.5swa" _uuid="00000000-0000-0000-A61A-9ED13BC8EFFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqvt_76ba.5swa"><intent_id>1272561</intent_id><project_id>1022041</project_id><text_data>25-WA-22031722-1019</text_data><comment_date>2022-10-06T00:00:00</comment_date></row><row _id="row-mc89~u3wa_bfty" _uuid="00000000-0000-0000-E5FF-835BF2962849" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mc89~u3wa_bfty"><intent_id>705568</intent_id><project_id>764192</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2015-07-07T00:00:00</comment_date></row><row _id="row-ie36~5v5h~8d5h" _uuid="00000000-0000-0000-9086-272E0A5ACB04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ie36~5v5h~8d5h"><intent_id>450023</intent_id><project_id>663160</project_id><text_data>Industrial Insurance Account Id: 432,567-00</text_data><comment_date>2011-04-13T00:00:00</comment_date></row><row _id="row-5bxc-gwxf.h3yb" _uuid="00000000-0000-0000-5BF3-A104E6F9B463" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bxc-gwxf.h3yb"><intent_id>1108408</intent_id><project_id>942726</project_id><text_data>Moon Job # 37-101224</text_data><comment_date>2020-12-08T00:00:00</comment_date></row><row _id="row-zj6r_zrnv_pjqm" _uuid="00000000-0000-0000-DB03-FF06DEE1CFBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zj6r_zrnv_pjqm"><intent_id>653047</intent_id><project_id>710976</project_id><text_data>Steller J Corporation is Filing on Behalf of Farrow Concrete Specialties due to failure to file the corrected set of forms per Hoffman Construction.</text_data><comment_date>2014-09-08T00:00:00</comment_date></row><row _id="row-j2gm.5btz-tgai" _uuid="00000000-0000-0000-26D8-19356D69D281" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j2gm.5btz-tgai"><intent_id>994861</intent_id><project_id>884606</project_id><text_data>Our duties for this project were to bring playground material in our truck to the facility where everything was marked and ready for the Swanson employee and additional hired subcontractor (landscape construction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used. Truck = KENWORTH T-800 4 axle Trailer = IMCO live floor trailer 48� This truck was used to deliver Engineered Wood Fiber (a type of Playground Chip). Material was delivered using our blower trailer to blow material into designated areas specified by the Prime Contractor. We hired a subcontractor to complete the landscape construction portion, to take a hose and blow the product on the playground where they told us. No other tools, etc. are used.</text_data><comment_date>2019-07-25T00:00:00</comment_date></row><row _id="row-nv36~k37x_zyvm" _uuid="00000000-0000-0000-7B20-0A0999F59D85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nv36~k37x_zyvm"><intent_id>967602</intent_id><project_id>876676</project_id><text_data>Install 6 strand single mode fiber cable from MDF to the IDF at Bus Garage. Use existing conduits. Outdoor and Indoor cable pulls. Terminate in enclosures.</text_data><comment_date>2019-03-26T00:00:00</comment_date></row><row _id="row-m2zn.bfuh.5p9y" _uuid="00000000-0000-0000-DC87-A5C39A93118E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2zn.bfuh.5p9y"><intent_id>746355</intent_id><project_id>774273</project_id><text_data>302072</text_data><comment_date>2016-02-11T00:00:00</comment_date></row><row _id="row-4aid.hed4-v2rd" _uuid="00000000-0000-0000-6320-021590FBB348" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4aid.hed4-v2rd"><intent_id>699154</intent_id><project_id>759468</project_id><text_data>RE:  New Thornton Creek Building Project  1.	What is the specific purpose of this awarding agency�s public works project?  Remodel elementary school building.2.	Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?  No. 3.	Does this project entail the remodeling or new construction of a facility?  Yes, but not performed by Siemens Employees. .4.	If your firm is working upon a type of building system, what type of system is involved? HVAC/refrigeration control system.  5.	5.  What specific tasks did your employees perform?  Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process.  White off-site, the BAU Technician create a computerized schematic of a particular building�s HVAC automations system.  That system is used to control the system�s functions after the mechanical commissioning process is complete.  Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer.  The BAU Technician typically sits in a central control room and manipulates the system using a computer program.   The program itself informs the Technician whether various components are functioning properly as they triggered.  If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified.  After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface.  Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.	What, if any, tools did your employees use in the performance of those tasks?  Laptop computer. 7.	If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks?  No �none. 8.	Are you going to be hiring any subcontractors for this project?  Yes.</text_data><comment_date>2015-06-08T00:00:00</comment_date></row><row _id="row-kgw5~878n~bv4x" _uuid="00000000-0000-0000-AFB5-FD60F471D3D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kgw5~878n~bv4x"><intent_id>612498</intent_id><project_id>727532</project_id><text_data>Form filed by: David Moruzzi(Wheelabrator is prime)</text_data><comment_date>2014-01-16T00:00:00</comment_date></row><row _id="row-ysvs~kdvy~v23e" _uuid="00000000-0000-0000-361E-6CD0E94ABBEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ysvs~kdvy~v23e"><intent_id>712935</intent_id><project_id>769391</project_id><text_data>Laborer duties (if utilized) may include minor demolition utilizing hand tools, material handling and general cleanup.</text_data><comment_date>2015-08-07T00:00:00</comment_date></row><row _id="row-s5nt_xka3.mwnh" _uuid="00000000-0000-0000-9FE2-ED4720A24627" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s5nt_xka3.mwnh"><intent_id>1267163</intent_id><project_id>817030</project_id><text_data>I need to file an Intent under CMC Rebar West so i can file the Affidavit of Wage Paid to close out the job for the prime contractor.</text_data><comment_date>2022-09-16T00:00:00</comment_date></row><row _id="row-rbs3_6gkp_rhm5" _uuid="00000000-0000-0000-AC2B-4AF37401D30E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rbs3_6gkp_rhm5"><intent_id>667167</intent_id><project_id>747241</project_id><text_data>***This form is being approved on the basis of your statement that your employees will perform professional electrical testing services using portable test equipment and will perform no tasks which require the use of hand or construction tools which are considered the work of a laborer, worker, or mechanic within the meaning of the prevailing wage laws. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-11-25T00:00:00</comment_date></row><row _id="row-u2qh_inyf_rtgn" _uuid="00000000-0000-0000-4280-D9313C156335" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u2qh_inyf_rtgn"><intent_id>1068145</intent_id><project_id>905356</project_id><text_data>ECI Job 20179</text_data><comment_date>2020-06-26T00:00:00</comment_date></row><row _id="row-uina-6vmc-riy5" _uuid="00000000-0000-0000-2142-FDDFBEEC77E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uina-6vmc-riy5"><intent_id>599192</intent_id><project_id>721628</project_id><text_data>It is most likely that only one surveyor will be on the site.  There are different rates for each possible surveyor.</text_data><comment_date>2013-10-14T00:00:00</comment_date></row><row _id="row-7xb6.kta6~sgw3" _uuid="00000000-0000-0000-C7AF-7BF88FC1065E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7xb6.kta6~sgw3"><intent_id>1227697</intent_id><project_id>992079</project_id><text_data>the truck is a trash truck under 12-yard capacity and 26,000 gvw</text_data><comment_date>2022-05-16T00:00:00</comment_date></row><row _id="row-ci5q-2hzu-k7nb" _uuid="00000000-0000-0000-31AA-200DEA402C20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ci5q-2hzu-k7nb"><intent_id>1145620</intent_id><project_id>962889</project_id><text_data>Invoice 900742-00 / Labor done via SRO 1911518</text_data><comment_date>2021-05-18T00:00:00</comment_date></row><row _id="row-bnqj_bcnz_bc54" _uuid="00000000-0000-0000-085D-766BFA921AD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bnqj_bcnz_bc54"><intent_id>494585</intent_id><project_id>680399</project_id><text_data>The scope of work for this project is to provide and install cat5e cable for voice and data network infrastructure</text_data><comment_date>2011-12-22T00:00:00</comment_date></row><row _id="row-e24z~mnff~sh2c" _uuid="00000000-0000-0000-F650-78A5D69587B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e24z~mnff~sh2c"><intent_id>791656</intent_id><project_id>770592</project_id><text_data>Job #1527 Ford Middle School</text_data><comment_date>2016-09-25T00:00:00</comment_date></row><row _id="row-89k9-hewz~yg76" _uuid="00000000-0000-0000-3A72-4920ADE61F19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89k9-hewz~yg76"><intent_id>874962</intent_id><project_id>837529</project_id><text_data>3000471</text_data><comment_date>2017-11-15T00:00:00</comment_date></row><row _id="row-tf8x.hnqg-rpka" _uuid="00000000-0000-0000-2711-4D81C5377573" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tf8x.hnqg-rpka"><intent_id>1198831</intent_id><project_id>991474</project_id><text_data>Job #39941-1</text_data><comment_date>2021-12-13T00:00:00</comment_date></row><row _id="row-ky34-7mp7-ivzf" _uuid="00000000-0000-0000-4FCF-03591DA305AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ky34-7mp7-ivzf"><intent_id>1201761</intent_id><project_id>993317</project_id><text_data>74420-0090</text_data><comment_date>2021-12-29T00:00:00</comment_date></row><row _id="row-65ky~3qki-zbra" _uuid="00000000-0000-0000-0FF8-E30EB5E033E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-65ky~3qki-zbra"><intent_id>1491622</intent_id><project_id>1159247</project_id><text_data>Project# 05624, Tarvin, Brenda, 1414 S Southeast Blvd, Spokane, WA 99203</text_data><comment_date>2024-12-06T00:00:00</comment_date></row><row _id="row-mgn4-vpff_6mvv" _uuid="00000000-0000-0000-107D-997C9A40D093" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mgn4-vpff_6mvv"><intent_id>854722</intent_id><project_id>829909</project_id><text_data>1)We were contracted to diagnose and repair hot water heater. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-08-14T00:00:00</comment_date></row><row _id="row-gins.tjc6~dbpm" _uuid="00000000-0000-0000-63E7-990CE9864CC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gins.tjc6~dbpm"><intent_id>1085952</intent_id><project_id>927486</project_id><text_data>Fringe is paid in cash</text_data><comment_date>2020-09-04T00:00:00</comment_date></row><row _id="row-tzk2.shtu_ernb" _uuid="00000000-0000-0000-9016-CB941C6CBED2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzk2.shtu_ernb"><intent_id>791679</intent_id><project_id>798092</project_id><text_data>We did fish removal on this project. This requires the use of nets, electrofisher, and we removed the fish from the diversion dam. Hand tools were used and long nets connected to poles, and dip nets were used. We occasionally helped hand sand bags to hold the visqueen down.</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-csu2_rrf6_vduw" _uuid="00000000-0000-0000-EFB0-5F14600F0507" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-csu2_rrf6_vduw"><intent_id>711404</intent_id><project_id>763101</project_id><text_data>Heavy haul trucks hauling concrete panels</text_data><comment_date>2015-07-31T00:00:00</comment_date></row><row _id="row-pp6m.kwye~v643" _uuid="00000000-0000-0000-238D-1E680580B03D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pp6m.kwye~v643"><intent_id>1115935</intent_id><project_id>946978</project_id><text_data>SRO 1910217</text_data><comment_date>2021-01-18T00:00:00</comment_date></row><row _id="row-qndg.jhak_hv5b" _uuid="00000000-0000-0000-69DF-A0D68D803C6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qndg.jhak_hv5b"><intent_id>1057045</intent_id><project_id>899823</project_id><text_data>Tiger mountain owns the trucks and lakeridge paving pays the employees</text_data><comment_date>2020-05-11T00:00:00</comment_date></row><row _id="row-gi2e.u4sf-mi49" _uuid="00000000-0000-0000-0F67-B9F1A9841C9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gi2e.u4sf-mi49"><intent_id>1186869</intent_id><project_id>946930</project_id><text_data>Job 203758-006</text_data><comment_date>2021-10-20T00:00:00</comment_date></row><row _id="row-urb4~8sr5~r7ht" _uuid="00000000-0000-0000-DFD0-F21D72557FD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-urb4~8sr5~r7ht"><intent_id>771224</intent_id><project_id>792864</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2016-06-28T00:00:00</comment_date></row><row _id="row-r2mq.d233.adif" _uuid="00000000-0000-0000-DE8A-71DC9ED66416" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r2mq.d233.adif"><intent_id>762014</intent_id><project_id>790157</project_id><text_data>There are several different classifications of work that will be done through this contract. Some of the work will be strictly landscaping involving groundwork only. Such as pruning from the ground on trees with a diameter of 4&amp;quot; or less, raking, and use of hand tools. This work is strictly for the beautification of landscape as per City of Spokane. Other work will be use other classifications such as Clean-up Laborer. The owner of the company will be operating power equipment as needed.</text_data><comment_date>2016-05-23T00:00:00</comment_date></row><row _id="row-dbyi-awrx~6hin" _uuid="00000000-0000-0000-3B6D-24F1C59BE775" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dbyi-awrx~6hin"><intent_id>1318799</intent_id><project_id>1062844</project_id><text_data>SR53480620 invoice 89668017</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-2mju~4q5j~3wvb" _uuid="00000000-0000-0000-5D7D-0BFD129BD6BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2mju~4q5j~3wvb"><intent_id>1215173</intent_id><project_id>1001840</project_id><text_data>Second St., La Conner, WA 982571. Air seal, crawl, mechanical ventilation   2. Single family      3. 1      4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No     5. Yes      6. Yes      7. No      8. No</text_data><comment_date>2022-03-03T00:00:00</comment_date></row><row _id="row-ds8n~8aix-eiit" _uuid="00000000-0000-0000-AB92-D9637B76575E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ds8n~8aix-eiit"><intent_id>574319</intent_id><project_id>712909</project_id><text_data>Trucks with 5th wheel pulling chip trailers</text_data><comment_date>2013-06-26T00:00:00</comment_date></row><row _id="row-h8ax.4ajb_smt4" _uuid="00000000-0000-0000-DFEE-154A47291719" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h8ax.4ajb_smt4"><intent_id>671524</intent_id><project_id>751561</project_id><text_data>TELECOMMUNICATION TECHNICIANS WORK DESCRIPTIONProvide and install network and telephone cable between instruments, terminals and sets and the connections to the distribution cable.Provide and install Blocks and Subpanels where large feed cables terminate at the distribution frames in the IDF or MDFProvide and install riser cables between floors from the MDF to the IDFLabel and test the cableINDOOR INSTALLATION</text_data><comment_date>2014-12-30T00:00:00</comment_date></row><row _id="row-hfut-na7j-kz67" _uuid="00000000-0000-0000-9C00-76D80C4B3B43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hfut-na7j-kz67"><intent_id>1217303</intent_id><project_id>1003215</project_id><text_data>WO 2367</text_data><comment_date>2022-03-11T00:00:00</comment_date></row><row _id="row-ym8j-iqu9_k2dd" _uuid="00000000-0000-0000-B660-271A6EE32F2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ym8j-iqu9_k2dd"><intent_id>923493</intent_id><project_id>853872</project_id><text_data>Install temp fence rental</text_data><comment_date>2018-08-06T00:00:00</comment_date></row><row _id="row-bj9v~aznj-t4nk" _uuid="00000000-0000-0000-B8E1-829B221AA1DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bj9v~aznj-t4nk"><intent_id>640392</intent_id><project_id>736472</project_id><text_data>We will be repairing the damaged irrigation lines within the State specifications, and repairing the landscaping.</text_data><comment_date>2014-07-11T00:00:00</comment_date></row><row _id="row-7wqu_v3pt~dkkb" _uuid="00000000-0000-0000-7D0C-0CF17D932FF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7wqu_v3pt~dkkb"><intent_id>1359656</intent_id><project_id>1075397</project_id><text_data>27136230002 PRP 2023 � 02</text_data><comment_date>2023-08-31T00:00:00</comment_date></row><row _id="row-c97q-apgd-w92w" _uuid="00000000-0000-0000-AE97-E9E63923E8BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c97q-apgd-w92w"><intent_id>854339</intent_id><project_id>829774</project_id><text_data>Fringe Benefits Per Hour:  Health, Welfare, Dental - $9.01; WA Pension - $4.56; Nat&amp;#39;l Pension - $2.49; Int&amp;#39;l Training - $.10; Industry Improvement - $.35; JATC - $1.88; Supplemental Pension - $4.75. Hourly Wage includes $4.00 Vacation.</text_data><comment_date>2017-08-11T00:00:00</comment_date></row><row _id="row-7jtx_cirz~53uh" _uuid="00000000-0000-0000-619D-C7330C258C77" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7jtx_cirz~53uh"><intent_id>777824</intent_id><project_id>798083</project_id><text_data>This is running off of the DES contract</text_data><comment_date>2016-08-03T00:00:00</comment_date></row><row _id="row-apvz_rc8s.dpd8" _uuid="00000000-0000-0000-EB0E-4C45F76509F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-apvz_rc8s.dpd8"><intent_id>1250789</intent_id><project_id>1009272</project_id><comment_date>2022-07-20T00:00:00</comment_date></row><row _id="row-hj39-7gjw_69x2" _uuid="00000000-0000-0000-FD3E-FE6D89562E78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hj39-7gjw_69x2"><intent_id>1090251</intent_id><project_id>933642</project_id><text_data>Other Truck:  Class 8 truck with a 2500 gallon water tank.  Water Truck used to water roadways.</text_data><comment_date>2020-09-29T00:00:00</comment_date></row><row _id="row-zaye.4jt5.gy8r" _uuid="00000000-0000-0000-C2CB-0C47D098942B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zaye.4jt5.gy8r"><intent_id>455648</intent_id><project_id>662515</project_id><text_data>PE# C3535</text_data><comment_date>2011-05-17T00:00:00</comment_date></row><row _id="row-qnhk~dvdj-k9yv" _uuid="00000000-0000-0000-48C8-00EBE0BD7A40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qnhk~dvdj-k9yv"><intent_id>567343</intent_id><project_id>710044</project_id><text_data>GENERAL LABORER - CLASS 3 - SHOVEL, PICK AX, GROUTING POLES</text_data><comment_date>2013-05-01T00:00:00</comment_date></row><row _id="row-3zd7-pusg-wcz7" _uuid="00000000-0000-0000-A903-7F25030991A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3zd7-pusg-wcz7"><intent_id>748167</intent_id><project_id>785767</project_id><text_data>KSD � Kennewick HS, KeHS, &amp; Horse Heaven Hills Baseball Fields � IntentThe Landscaping was for a school baseball field projects. We will resurface the baseball fields and infield areas with 3� of topsoil and sod. Using hand tools such as shovels, rakes, pipe cutters &amp; etc. Equipment was under the 90 HP � a small skit steer and loader.</text_data><comment_date>2016-02-23T00:00:00</comment_date></row><row _id="row-bbdb~jp7q~dbrp" _uuid="00000000-0000-0000-2072-D4560EFCE36D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bbdb~jp7q~dbrp"><intent_id>1044160</intent_id><project_id>911709</project_id><comment_date>2020-03-10T00:00:00</comment_date></row><row _id="row-iudp-nnbt~atvk" _uuid="00000000-0000-0000-FD60-C1BB5341932D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iudp-nnbt~atvk"><intent_id>540399</intent_id><project_id>698056</project_id><text_data>The scope for the project is to provide and install CAT6 horizontal cables and fiber backbone</text_data><comment_date>2012-10-17T00:00:00</comment_date></row><row _id="row-esan-wd5h~vdud" _uuid="00000000-0000-0000-D89E-CC5A2179267C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-esan-wd5h~vdud"><intent_id>494783</intent_id><project_id>671932</project_id><text_data>a)The entire project reflects impovements to the WVHY including planting, seeding, and dirtwork.b) Our portion of the project is to spray seeding material as specified to designated areas. Material is sprayed through a hydroseed installation truck. Hydroseeding is a one step process.</text_data><comment_date>2011-12-29T00:00:00</comment_date></row><row _id="row-pcus~fsmd-zhnt" _uuid="00000000-0000-0000-1F40-1007CFD551B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pcus~fsmd-zhnt"><intent_id>915452</intent_id><project_id>854947</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT. IT IS A SINGLE FAMILY, RESIDENTIAL DWELLING.</text_data><comment_date>2018-07-02T00:00:00</comment_date></row><row _id="row-bpe9-fkzr.ivdf" _uuid="00000000-0000-0000-1DDF-97BD6A06BBEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bpe9-fkzr.ivdf"><intent_id>1156411</intent_id><project_id>968659</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2021-07-12T00:00:00</comment_date></row><row _id="row-39xi~y225-sy6n" _uuid="00000000-0000-0000-1907-93405A814C9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39xi~y225-sy6n"><intent_id>822048</intent_id><project_id>816191</project_id><text_data>Signatory to Sprinkler Fitters Road Local 669, District 21. Note: As of 4-1-17 the union rates will increase, these new rates are noted above.</text_data><comment_date>2017-03-22T00:00:00</comment_date></row><row _id="row-5giz-tzrq.a7cf" _uuid="00000000-0000-0000-5E59-3720DB129DFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5giz-tzrq.a7cf"><intent_id>864945</intent_id><project_id>816522</project_id><text_data>1117028</text_data><comment_date>2017-09-25T00:00:00</comment_date></row><row _id="row-rp5a~cjuh_ty7k" _uuid="00000000-0000-0000-C331-B90F8982AD62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rp5a~cjuh_ty7k"><intent_id>953990</intent_id><project_id>863064</project_id><text_data>Our duties for this project were to bring playground material in our truck to the facility where everything was marked and ready for the Swanson employee and additional hired subcontractor (landscape construction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used.Truck = KENWORTH T-800 4 axleTrailer = IMCO live floor trailer 48�This truck was used to deliver Engineered Wood Fiber (a type of Playground Chip). Material was delivered using our blower trailer to blow material into designated areas specified by the Prime Contractor.We hired a subcontractor to complete the landscape construction portion, to take a hose and blow the product on the playground where they told us. No other tools, etc. are used</text_data><comment_date>2019-01-08T00:00:00</comment_date></row><row _id="row-dvm3.8zc4.2wnu" _uuid="00000000-0000-0000-7CDD-861B796DE0E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dvm3.8zc4.2wnu"><intent_id>625031</intent_id><project_id>733041</project_id><text_data>Job # 204743</text_data><comment_date>2014-04-15T00:00:00</comment_date></row><row _id="row-5u3p.a2g5~gepd" _uuid="00000000-0000-0000-B125-5FA291D8F185" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5u3p.a2g5~gepd"><intent_id>1065756</intent_id><project_id>905902</project_id><text_data>Everett city locks</text_data><comment_date>2020-06-17T00:00:00</comment_date></row><row _id="row-fcj6.yx99.yjk3" _uuid="00000000-0000-0000-28F6-7BFEA140EE66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fcj6.yx99.yjk3"><intent_id>498023</intent_id><project_id>681817</project_id><text_data>Sent e-mail:  Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor).  For this Intent filing firms are to enter �Time and Materials� for  the dollar amount of the contract as an exact dollar amount cannot be identified at the time of filing. To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  When filing these forms, the dollar amount of the contract (which is the total amount that will be invoiced), including tax, will be entered on the form along with a short explanation in the notes section about the nature of the work so that the project can be tracked by the awarding agency and L&amp;I. In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures.  Please note that an on-call/blanket/annual contract may not be utilized for construction projects or for warranty work as these require their own set of Intent and Affidavit forms with the appropriate bid and award dates associated with those specific contracts.  The use of on-call/blanket/annual contracts is limited to minor maintenance and repair work.  If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work.On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out.  This form filing requirement also applies to owner/operators.  Please follow this filing method on any future contracts covered under this policy.  (RCW 39.12.040)We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.  A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.aspIf you have any questions, please contact me.</text_data><comment_date>2012-04-20T00:00:00</comment_date></row><row _id="row-ir3g_funr~r3v2" _uuid="00000000-0000-0000-F275-85949E31939E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ir3g_funr~r3v2"><intent_id>540268</intent_id><project_id>697108</project_id><text_data>The purpose of this project is to build a hiking trail in Bellevue, WA.</text_data><comment_date>2012-10-22T00:00:00</comment_date></row><row _id="row-6gfu-e6t3~bxwt" _uuid="00000000-0000-0000-5ED1-8F2E4E7091B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6gfu-e6t3~bxwt"><intent_id>532380</intent_id><project_id>691101</project_id><text_data>Landscape Equipment operator will be used in pounding wooden stakes</text_data><comment_date>2012-09-04T00:00:00</comment_date></row><row _id="row-dgj9-t99h~gbn9" _uuid="00000000-0000-0000-91C3-3CF70AFDCFC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgj9-t99h~gbn9"><intent_id>1111968</intent_id><project_id>944702</project_id><text_data>Inv #27496 - Fire Station 94 - No Heat -HVAC Units</text_data><comment_date>2020-12-28T00:00:00</comment_date></row><row _id="row-t3mv_j7z2_38g7" _uuid="00000000-0000-0000-5B4C-049060FA0162" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3mv_j7z2_38g7"><intent_id>1231986</intent_id><project_id>950240</project_id><text_data>SCI Job #2101</text_data><comment_date>2022-05-09T00:00:00</comment_date></row><row _id="row-q9ma_99xk.pv8d" _uuid="00000000-0000-0000-049B-F65904FEEAD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9ma_99xk.pv8d"><intent_id>857691</intent_id><project_id>827578</project_id><text_data>GU Job #17201Truck Driver:  Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2017-08-22T00:00:00</comment_date></row><row _id="row-smu9.cwav.2t9x" _uuid="00000000-0000-0000-7BE6-FFF00E3D6DA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-smu9.cwav.2t9x"><intent_id>666409</intent_id><project_id>749130</project_id><text_data>1613520</text_data><comment_date>2014-11-19T00:00:00</comment_date></row><row _id="row-ih6c_pqub_tyhi" _uuid="00000000-0000-0000-7020-EA860ACCA5D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ih6c_pqub_tyhi"><intent_id>602145</intent_id><project_id>719784</project_id><text_data>HIRED BY PRIME</text_data><comment_date>2013-10-30T00:00:00</comment_date></row><row _id="row-mbmy.dmtf-7db9" _uuid="00000000-0000-0000-7937-2EE088874844" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbmy.dmtf-7db9"><intent_id>1195252</intent_id><project_id>989233</project_id><text_data>In order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2- Single Family3-1-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- nok- no6- no7- no8- no</text_data><comment_date>2021-11-23T00:00:00</comment_date></row><row _id="row-kb5v_me6z~7u7k" _uuid="00000000-0000-0000-9276-AEA004140724" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kb5v_me6z~7u7k"><intent_id>783818</intent_id><project_id>800355</project_id><text_data>Genesee Hill 41343Arbor Heights 41344TT Minor 41345Pinehurst 41347</text_data><comment_date>2016-08-19T00:00:00</comment_date></row><row _id="row-tm57-m7s6-ef3k" _uuid="00000000-0000-0000-C5B8-3CFE95860F6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tm57-m7s6-ef3k"><intent_id>1077456</intent_id><project_id>927820</project_id><text_data>All will be subbed to CAZ Enviro</text_data><comment_date>2020-08-13T00:00:00</comment_date></row><row _id="row-mvwt_4g4z.nwz4" _uuid="00000000-0000-0000-6818-1528E01F7552" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mvwt_4g4z.nwz4"><intent_id>823061</intent_id><project_id>816636</project_id><text_data>#19689, Martinsen, R., 1022 E. D, Deer Park#19772, Bartole, C., 603 W. Knox, Spokane#19660, Bennett, D., 7314 E. Sinto, Spokane#19684, Stone, T., 8900 S. Mullen Rd.,#60, Spokane#19662, Rudenko, V., 4410 N. Malta, Newman Lake#19678, Voelker, G., 3104 N. Cedar, Spokane#19659, Weston, A., 11920 E. Mansfield, #85, Spokane Valley#19679,Nelson, C., 2605 S. Davis, Spokane Valley#19602, Watson, F., 4110 N. Whitehouse, Spokane#19695, Doyle, T., 1917 W. 11th, Spokane#19706, Grant, M., 14906 E. Broad, Spokane Valley#19675, Slaten, J., 3228 E. 33rd, Spokane#19661, Schaubert, D., 3510 E. 16th, Spokane#19683, Quam, K., 1207 E. Lyons, Spokane#19729, Wright, K., 7407 W. 51st, Spokane#19629, Ammon, E., 3220 N. Coleman, Spokane#1. Weatherization, #2. Single Family Dwelling, #3. 2 story, #4. A. no, B. no, C. yes, D. no, E. no, F. no, G. no, H. no, I. no, J. no, K. no, L. N/A, #5. yes, #6. Yes, #7. no, #8. no.</text_data><comment_date>2017-03-29T00:00:00</comment_date></row><row _id="row-nriy.fvqp.jddx" _uuid="00000000-0000-0000-1ABC-2F61B8F40277" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nriy.fvqp.jddx"><intent_id>1083695</intent_id><project_id>928246</project_id><text_data>Blythe job X-316</text_data><comment_date>2020-08-27T00:00:00</comment_date></row><row _id="row-3mev-dw3v-rrca" _uuid="00000000-0000-0000-0A52-CB1C826B350B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3mev-dw3v-rrca"><intent_id>1195357</intent_id><project_id>898694</project_id><text_data>Truck is an F550 used to transport equipment and material to and from job site</text_data><comment_date>2021-11-24T00:00:00</comment_date></row><row _id="row-mkeh_djdj.488b" _uuid="00000000-0000-0000-2D66-EA997B85CF14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mkeh_djdj.488b"><intent_id>814838</intent_id><project_id>793696</project_id><text_data>Our firm has been hired to place topsoil, wood chips and new plantings between new sidewalks and curbs per the WAC &amp; RCW Codes for new landscape construction.</text_data><comment_date>2017-02-07T00:00:00</comment_date></row><row _id="row-7e5x-x3sz.z88j" _uuid="00000000-0000-0000-67F5-0A64133B410B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7e5x-x3sz.z88j"><intent_id>819464</intent_id><project_id>815030</project_id><text_data>This job will consist of irrigation, top soil placement and planting of trees and shrubs. Irrigation depth will 18&amp;quot; and the trenches will be dug by hand. We will be using a light duty skid steer bobcat for topsoil placement. We will first install irrigation, next we will place the topsoil and last we will be planting the trees and shrubs.</text_data><comment_date>2017-03-07T00:00:00</comment_date></row><row _id="row-3bmp-aw49.d8kf" _uuid="00000000-0000-0000-A86E-78E5D23995F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bmp-aw49.d8kf"><intent_id>495519</intent_id><project_id>680783</project_id><text_data>Our landscaping services entail pulling weeds, watering and replacing damaged plants.</text_data><comment_date>2012-01-08T00:00:00</comment_date></row><row _id="row-73qy-jjk2-hdyn" _uuid="00000000-0000-0000-3D42-BA0AE2D4C80C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73qy-jjk2-hdyn"><intent_id>840744</intent_id><project_id>822979</project_id><text_data>Bath fan installation, single family, 1, primary residence. no,no,yes,no,no,no,no,no,no,no,no,yes,yes,no,no</text_data><comment_date>2017-06-14T00:00:00</comment_date></row><row _id="row-mfw5~tmsv_xrih" _uuid="00000000-0000-0000-BA21-2A54555D2D62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mfw5~tmsv_xrih"><intent_id>943583</intent_id><project_id>816144</project_id><text_data>7170004 - McGilvra Elementary</text_data><comment_date>2018-11-02T00:00:00</comment_date></row><row _id="row-xv9g-qj8b_qb5r" _uuid="00000000-0000-0000-FE5A-EFDD07949C12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xv9g-qj8b_qb5r"><intent_id>969698</intent_id><project_id>877621</project_id><text_data>Weeding. Hand tools only.</text_data><comment_date>2019-04-04T00:00:00</comment_date></row><row _id="row-qnqd-s94c~hh6u" _uuid="00000000-0000-0000-53AC-D678C1DC6270" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qnqd-s94c~hh6u"><intent_id>891168</intent_id><project_id>822014</project_id><text_data>PPC# 18079</text_data><comment_date>2018-03-05T00:00:00</comment_date></row><row _id="row-squ4~h59b.25qg" _uuid="00000000-0000-0000-B98C-147F82B87A85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-squ4~h59b.25qg"><intent_id>569561</intent_id><project_id>710971</project_id><text_data>REPLACES SOI 562257 FOR NAME CORRECTION</text_data><comment_date>2013-05-14T00:00:00</comment_date></row><row _id="row-4dzi_fqcs.qb6r" _uuid="00000000-0000-0000-A652-27ABC7E2DF3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4dzi_fqcs.qb6r"><intent_id>980946</intent_id><project_id>882501</project_id><text_data>Contract #3350</text_data><comment_date>2019-05-29T00:00:00</comment_date></row><row _id="row-ciid~fhw6-igka" _uuid="00000000-0000-0000-C6B6-ADF14B4FAABD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ciid~fhw6-igka"><intent_id>864676</intent_id><project_id>833328</project_id><text_data>Job Order Contract MC-0318290Project No.  U00090 - Work Order No.  020CCE 73330-0021</text_data><comment_date>2017-09-22T00:00:00</comment_date></row><row _id="row-nj6m~28be-u7x8" _uuid="00000000-0000-0000-9A1C-067FA48CC9FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nj6m~28be-u7x8"><intent_id>952028</intent_id><project_id>822996</project_id><text_data>Filed by Heather Williams</text_data><comment_date>2018-12-21T00:00:00</comment_date></row><row _id="row-qbc4~9hd9-nvxq" _uuid="00000000-0000-0000-A2BA-233E64617F2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbc4~9hd9-nvxq"><intent_id>1159134</intent_id><project_id>970080</project_id><text_data>Time &amp; Material, Laborer, Technician. Respond to and mitigate a transformer oil release. Use of pick up truck, response trailer, suction hose, hard pipe and hose, smooth bore, hand tools, protective gear level D, hydroblast tips, low pressure jet, cable tool, spin nozzle, high flow hose, cable tool.</text_data><comment_date>2021-07-28T00:00:00</comment_date></row><row _id="row-qpfd-j4wh-qcb3" _uuid="00000000-0000-0000-0A04-CFB519D4AED3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qpfd-j4wh-qcb3"><intent_id>826815</intent_id><project_id>818221</project_id><text_data>Replaced Liberty LE51A 1/2 HP pump.</text_data><comment_date>2017-04-15T00:00:00</comment_date></row><row _id="row-h4qy-mbk5_axy9" _uuid="00000000-0000-0000-DF51-77F00868B0C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h4qy-mbk5_axy9"><intent_id>936741</intent_id><project_id>862882</project_id><text_data>WO #8042611</text_data><comment_date>2018-10-01T00:00:00</comment_date></row><row _id="row-mymb.xhmt.sv9i" _uuid="00000000-0000-0000-1156-3D8402BB9BC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mymb.xhmt.sv9i"><intent_id>1060449</intent_id><project_id>915979</project_id><text_data>This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2020-06-02T00:00:00</comment_date></row><row _id="row-6rcq_fibj~jp84" _uuid="00000000-0000-0000-C576-647A1B715F2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6rcq_fibj~jp84"><intent_id>1259813</intent_id><project_id>969219</project_id><text_data>Performing dust control and Hydroseeding utilizing a truck with a GVW of 52,000lbs that has a permanently attached 3500-gallon water tank on the back with the ability to agitate and create a slurry using internal augers.</text_data><comment_date>2022-08-19T00:00:00</comment_date></row><row _id="row-ywpt_48nc-sk9q" _uuid="00000000-0000-0000-B707-D338E0FD5139" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ywpt_48nc-sk9q"><intent_id>792771</intent_id><project_id>797579</project_id><text_data>We are a staffing company. Provide and install cat 6 cabling for voice (phones) and data (computers). Terminate, test and label. Cabling will be run indoors.</text_data><comment_date>2016-09-29T00:00:00</comment_date></row><row _id="row-ry8g.hpb3~jiuz" _uuid="00000000-0000-0000-7F0C-3A57F9BCDE0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ry8g.hpb3~jiuz"><intent_id>962449</intent_id><project_id>874253</project_id><text_data>(2) Artech art handlers to deinstall and later re-install (1) fountain at Newport Way Branch using hand tools.</text_data><comment_date>2019-02-27T00:00:00</comment_date></row><row _id="row-muqx~cxwz~6xmn" _uuid="00000000-0000-0000-FDDC-186D09FF675B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-muqx~cxwz~6xmn"><intent_id>774321</intent_id><project_id>759468</project_id><text_data>***This form is being approved on the basis of your statement that your employees will perform professional electrical testing services using portable test equipment and will perform no tasks which require the use of hand or construction tools which are considered the work of a laborer, worker, or mechanic within the meaning of the prevailing wage laws. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2016-07-13T00:00:00</comment_date></row><row _id="row-4tvz-6fu7~j4xg" _uuid="00000000-0000-0000-B5FD-837D32484A59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4tvz-6fu7~j4xg"><intent_id>679970</intent_id><project_id>756031</project_id><text_data>TELECOMMUNICATION TECHNICIANS WORK DESCRIPTIONProvide and install network and telephone cable between instruments, terminals and sets and the connections to the distribution cable.Provide and install Blocks and Subpanels where large feed cables terminate at the distribution frames in the IDF or MDFProvide and install riser cables between floors from the MDF to the IDFLabel and test the cableINDOOR INSTALLATION</text_data><comment_date>2015-02-19T00:00:00</comment_date></row><row _id="row-pean~7edp-nz4v" _uuid="00000000-0000-0000-1F4B-A3C6D56C7BAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pean~7edp-nz4v"><intent_id>1062772</intent_id><project_id>921272</project_id><text_data>Elect tech(06)Inside workinstall new data cabling</text_data><comment_date>2020-06-04T00:00:00</comment_date></row><row _id="row-j75d-xynk-3q3h" _uuid="00000000-0000-0000-0767-EA58DB5B71EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j75d-xynk-3q3h"><intent_id>1000292</intent_id><project_id>890540</project_id><text_data>SR#  45043542</text_data><comment_date>2019-08-16T00:00:00</comment_date></row><row _id="row-cbbk.gvku.xjes" _uuid="00000000-0000-0000-5771-187F8701AEF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cbbk.gvku.xjes"><intent_id>885750</intent_id><project_id>842541</project_id><text_data>This contract is and amended contract for an additional 2 year term including years 2018-2019 for Landscape Maintenance Services at Eastgate, Lakemont, and North Bellevue Community Center Parks inthe City of Bellevue. This project will consist of mowing, edging, weedeating, bed care, pruning, and litter and leaf fall removal.  Equipment to be used will consist of walk behind mowers, weedeaters, pruning shears, backpack blower for clean up, rakes, shovels, buckets, hoes, and a backpack blower for clean up as required to complete the required maintenance of these established  planting and turf areas for these City of Bellevue sites.  This serfvice is set on a weekly schedule from March 1st through October 31st and biweekly from November 1st through February 28th.</text_data><comment_date>2018-01-30T00:00:00</comment_date></row><row _id="row-5sqj_bw5k~3xe7" _uuid="00000000-0000-0000-4B7E-CA0864CD7DDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5sqj_bw5k~3xe7"><intent_id>859995</intent_id><project_id>831544</project_id><text_data>for inv # 6000256447 &amp; 6000256448</text_data><comment_date>2017-08-31T00:00:00</comment_date></row><row _id="row-5u5b_qs2d.pyfm" _uuid="00000000-0000-0000-C58B-13ECBA5B0BB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5u5b_qs2d.pyfm"><intent_id>901061</intent_id><project_id>849333</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2018-04-26T00:00:00</comment_date></row><row _id="row-hsgs~tpq4_6zpm" _uuid="00000000-0000-0000-6DFD-A0D802132223" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hsgs~tpq4_6zpm"><intent_id>1141183</intent_id><project_id>960490</project_id><text_data>Install HVAC air handler Single Family dwelling1a. No		b. No		c. Yes		d. No		e. No		f. No		g. No		h. No		i. No		j. No		k.	No		l. NoYesYesNoNo</text_data><comment_date>2021-04-30T00:00:00</comment_date></row><row _id="row-pa7z.3atg-hnk3" _uuid="00000000-0000-0000-1B9C-012A26946F8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pa7z.3atg-hnk3"><intent_id>1043015</intent_id><project_id>911118</project_id><text_data>2007 International Toter was used to haul the mobile office building to site.</text_data><comment_date>2020-03-18T00:00:00</comment_date></row><row _id="row-f8r9-xa8v~pb8z" _uuid="00000000-0000-0000-9E94-310F302CC089" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f8r9-xa8v~pb8z"><intent_id>634105</intent_id><project_id>735578</project_id><text_data>Freightliner, Peterbilt, or Kenworth trucks will be accompanied by container and/or flatbed chassis.  The trucks and trailers will be used to haul materials to and from the job locations.</text_data><comment_date>2014-06-10T00:00:00</comment_date></row><row _id="row-t379-q8wj.hz6f" _uuid="00000000-0000-0000-F5FB-2868C95AD883" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t379-q8wj.hz6f"><intent_id>990769</intent_id><project_id>886802</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT, IT IS A SINGLE FAMILY RESIDENTIAL DWELLING.</text_data><comment_date>2019-07-10T00:00:00</comment_date></row><row _id="row-7f68-sw2u-kjrc" _uuid="00000000-0000-0000-CCA9-92D684E7C913" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7f68-sw2u-kjrc"><intent_id>1018712</intent_id><project_id>898225</project_id><text_data>Service calls for FWSD 2019-2020</text_data><comment_date>2019-10-30T00:00:00</comment_date></row><row _id="row-uvbr_xdnz-iuk4" _uuid="00000000-0000-0000-0213-019F62C88759" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uvbr_xdnz-iuk4"><intent_id>538513</intent_id><project_id>697365</project_id><text_data>Form filed by: James Raymond</text_data><comment_date>2012-10-05T00:00:00</comment_date></row><row _id="row-ykvf-48xx.h4nw" _uuid="00000000-0000-0000-775A-6D9A34AEB2FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ykvf-48xx.h4nw"><intent_id>525865</intent_id><project_id>692868</project_id><text_data>Hand digging and loading and unloading of truck--Laborer description of work</text_data><comment_date>2012-08-03T00:00:00</comment_date></row><row _id="row-txns~bfka~az8j" _uuid="00000000-0000-0000-CB2F-6CA15C1D92CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-txns~bfka~az8j"><intent_id>1182739</intent_id><project_id>982071</project_id><text_data>Invoice 497312-00 / Labor SRO 481449</text_data><comment_date>2021-10-04T00:00:00</comment_date></row><row _id="row-uwn6~vqpu_jizu" _uuid="00000000-0000-0000-C709-65C03B948134" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwn6~vqpu_jizu"><intent_id>1251875</intent_id><project_id>1023321</project_id><text_data>OTHER TRUCK IS A LESS THAN 3000 GALLON WATER TRUCK</text_data><comment_date>2022-07-25T00:00:00</comment_date></row><row _id="row-qdeh_ynwy.njr7" _uuid="00000000-0000-0000-B142-90B266E26851" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qdeh_ynwy.njr7"><intent_id>1214066</intent_id><project_id>1001103</project_id><text_data>To answer the questions regarding the correction to intent #1214066, please see answer below:Gate RepairFabrication of embed steel and mechanical components. Delivery to site and field installation. No.N/AGate Repair (Mechanical)Hand tools, powered pullerN/AAsbestos Central, LLC (for lead abatement)7/1/2022</text_data><comment_date>2022-03-21T00:00:00</comment_date></row><row _id="row-6jje.hcpi-i7y9" _uuid="00000000-0000-0000-C471-B5DDEC990BA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6jje.hcpi-i7y9"><intent_id>696354</intent_id><project_id>761412</project_id><text_data>Form filed by:  Walt Meglasson</text_data><comment_date>2015-05-26T00:00:00</comment_date></row><row _id="row-5tfx-4sq7~8azy" _uuid="00000000-0000-0000-C74B-2D61F95DCA9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5tfx-4sq7~8azy"><intent_id>1508960</intent_id><project_id>1170066</project_id><text_data>Mounting, by means of screws, core network equipment (firewall) to existing telecommunications racks, indoors.</text_data><comment_date>2025-02-11T00:00:00</comment_date></row><row _id="row-wra8_ecjy_sjvt" _uuid="00000000-0000-0000-8CCE-03E686839005" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wra8_ecjy_sjvt"><intent_id>1209377</intent_id><project_id>998248</project_id><text_data>#1 replaced a heater and 5 thermostat and 1 timer. Also a kitchen and bathroom can light. and one ceiling heater.#2 single family dwelling#3 one story#4a no b no c yes d no e no f no g no i no j no k no l no#5 n/a#6 n/a#7 n/a#8 no</text_data><comment_date>2022-02-04T00:00:00</comment_date></row><row _id="row-jr64~c4a7-me6q" _uuid="00000000-0000-0000-8118-DE6FE0DE9CAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jr64~c4a7-me6q"><intent_id>1230670</intent_id><project_id>1011449</project_id><text_data>301SNM0276 - Intent</text_data><comment_date>2022-05-03T00:00:00</comment_date></row><row _id="row-sv2s.igbz_aqzp" _uuid="00000000-0000-0000-C7EA-84BA568B59B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sv2s.igbz_aqzp"><intent_id>447390</intent_id><project_id>639499</project_id><text_data>TRUCK DRIVER OTHER IS USED FOR TRUCK MOUNTED PICKUP SWEEPER</text_data><comment_date>2011-03-16T00:00:00</comment_date></row><row _id="row-z9kf~5e66_kf2y" _uuid="00000000-0000-0000-8428-E2BF6B843C4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z9kf~5e66_kf2y"><intent_id>816190</intent_id><project_id>792470</project_id><text_data>Filed by Daniel J. Gaughan.Finished up the lawn sprinkler system. Including installing drip lines, controller, and backflow preventer.</text_data><comment_date>2017-02-15T00:00:00</comment_date></row><row _id="row-tx9p~mtvf~xhp9" _uuid="00000000-0000-0000-D39D-A63B82936450" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tx9p~mtvf~xhp9"><intent_id>1157226</intent_id><project_id>969098</project_id><text_data>A) Was requested directly from Seattle CL to repair the concrete spall &amp; sealing the cracks on the walls. B) We were to grind down / chip to repair the concrete by injecting the epoxy to seal up cracks in walls C)  Laborer was Certified in confined spaces, and was using chipping gun/grinder/vacuum/paddle mixer/ injection pump to complete the work onsite.</text_data><comment_date>2021-07-15T00:00:00</comment_date></row><row _id="row-etaz_vse8_5spc" _uuid="00000000-0000-0000-9CBF-A39B72450CAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-etaz_vse8_5spc"><intent_id>508440</intent_id><project_id>685819</project_id><text_data>I have incorrectly listed Dorsey Electric as the Hiring Contractor the correct Hiring Contractor is Whitebird Construction license #WHITI*105M4 AND UBI#601258208601258208</text_data><comment_date>2012-04-23T00:00:00</comment_date></row><row _id="row-wwav.z7e7~8m2f" _uuid="00000000-0000-0000-A6E3-5DD17CDE4733" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wwav.z7e7~8m2f"><intent_id>614161</intent_id><project_id>728244</project_id><text_data>Water damage dry out tech. No other category.</text_data><comment_date>2014-02-10T00:00:00</comment_date></row><row _id="row-fbbn~9zmw-nfp6" _uuid="00000000-0000-0000-805A-3CA9CC78EE11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fbbn~9zmw-nfp6"><intent_id>889313</intent_id><project_id>844193</project_id><text_data>DEI Job D004172</text_data><comment_date>2018-02-21T00:00:00</comment_date></row><row _id="row-rdjx_pc3i~6vq8" _uuid="00000000-0000-0000-CB3B-5D021D0FF921" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rdjx_pc3i~6vq8"><intent_id>1090089</intent_id><project_id>931058</project_id><text_data>1 drain cleaning 2 single 3 na 4a no b no c yes d no e no f no g no h no i no j no k no 5 yes 6 yes 7 no 8 no</text_data><comment_date>2020-09-22T00:00:00</comment_date></row><row _id="row-bgip.tkvv_bpw8" _uuid="00000000-0000-0000-420C-535FF9102303" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bgip.tkvv_bpw8"><intent_id>1119429</intent_id><project_id>943303</project_id><text_data>0421006</text_data><comment_date>2021-02-02T00:00:00</comment_date></row><row _id="row-5mdq_ewe8-f6xh" _uuid="00000000-0000-0000-9428-542BC5559DA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5mdq_ewe8-f6xh"><intent_id>1179712</intent_id><project_id>980427</project_id><text_data>Wildlands will be planting, mulching, and fencing.</text_data><comment_date>2021-09-22T00:00:00</comment_date></row><row _id="row-4wnt.2g7f~xvz7" _uuid="00000000-0000-0000-E0F7-EF55ECF69902" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4wnt.2g7f~xvz7"><intent_id>567295</intent_id><project_id>709705</project_id><text_data>The other truck: will be a 4500 gallon 3 axle water truck, used for dust control and compaction on the job site.</text_data><comment_date>2013-05-07T00:00:00</comment_date></row><row _id="row-fcrh.94gk-k6g8" _uuid="00000000-0000-0000-0B23-8C8FBD8A1ED3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fcrh.94gk-k6g8"><intent_id>1099217</intent_id><project_id>937859</project_id><text_data>Invoice #126354 drain cleaning</text_data><comment_date>2020-10-27T00:00:00</comment_date></row><row _id="row-phcm~key3_v35c" _uuid="00000000-0000-0000-A7B5-6F7ABE2D85CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-phcm~key3_v35c"><intent_id>552093</intent_id><project_id>703123</project_id><text_data>Project Description:  Provide data cabling for the hallway timeclock.</text_data><comment_date>2013-01-17T00:00:00</comment_date></row><row _id="row-vasg_kjaf_w2p8" _uuid="00000000-0000-0000-B573-057D5B8AAD7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vasg_kjaf_w2p8"><intent_id>962817</intent_id><project_id>847389</project_id><text_data>FILED BY KIM BURNSIDE</text_data><comment_date>2019-03-01T00:00:00</comment_date></row><row _id="row-3ri9~36p3_nvrv" _uuid="00000000-0000-0000-F704-410378196DB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ri9~36p3_nvrv"><intent_id>698755</intent_id><project_id>764066</project_id><text_data>Fastening bird nylon netting to a stadium structure</text_data><comment_date>2015-06-05T00:00:00</comment_date></row><row _id="row-d6rp.q8xq.3shk" _uuid="00000000-0000-0000-88FA-7AD10D75C98C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d6rp.q8xq.3shk"><intent_id>573257</intent_id><project_id>709806</project_id><text_data>Our scope of work includes an automatic sprinkler irrigation system around the building being constructed.  Additionally we will plant plantings.  Equipment used will be walk behind trencher machine for irrigation pipe and various hand tools.</text_data><comment_date>2013-06-04T00:00:00</comment_date></row><row _id="row-r5ep.3gx4_7y2c" _uuid="00000000-0000-0000-39C4-F1AC1742EBCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5ep.3gx4_7y2c"><intent_id>614298</intent_id><project_id>722175</project_id><text_data>Filed by Gary Liles</text_data><comment_date>2014-01-30T00:00:00</comment_date></row><row _id="row-2uxu-m38z~kvc3" _uuid="00000000-0000-0000-BD06-80BFCE1F71D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2uxu-m38z~kvc3"><intent_id>827663</intent_id><project_id>818548</project_id><text_data>The 33.12 fringe is paid as:  $2.26 benefits - $1.54 medical, $.02 Life Insurance,$.41 Holiday pay, $.29 Vacation.  The rest will be cash $30.86 as this employee&amp;#39;s hourly pay is $14.56 per hour.</text_data><comment_date>2017-04-25T00:00:00</comment_date></row><row _id="row-6dt8~vx4t~t7ts" _uuid="00000000-0000-0000-E661-D8647EDDE2B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6dt8~vx4t~t7ts"><intent_id>1060862</intent_id><project_id>920343</project_id><text_data>1520123</text_data><comment_date>2020-05-28T00:00:00</comment_date></row><row _id="row-v84v-a5qz~qjp7" _uuid="00000000-0000-0000-B8E2-4CE5CCC352A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v84v-a5qz~qjp7"><intent_id>1149793</intent_id><project_id>962549</project_id><text_data>This payment cleared our bank on 6/25/21.  See below transaction details from our bank.  06/25   20.00   External Withdrawal LABOR&amp;INDUSTRIES - PREV WAGE 388809</text_data><comment_date>2021-07-16T00:00:00</comment_date></row><row _id="row-uqg2-egar-t63x" _uuid="00000000-0000-0000-3389-AC0A7554D22B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uqg2-egar-t63x"><intent_id>1205345</intent_id><project_id>995698</project_id><text_data>1 - Residential construction on a house. #2 - Single family dwelling. #3 - 1 story. #4 - Rehabilitation house? No. Transitional housing? No. Communal dining facility? No. Treatment services? No. Dormitories? No. Counseling? No. Is each room and/or bed in the structure rented separately? No. Other? No. #5 - Yes. #6 - Yes. #7 - No. #8 - No.</text_data><comment_date>2022-01-18T00:00:00</comment_date></row><row _id="row-2fxr-ebq4-7k9y" _uuid="00000000-0000-0000-DADD-D81B5D8755AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2fxr-ebq4-7k9y"><intent_id>922088</intent_id><project_id>848176</project_id><text_data>JCI Project Number 8N59-0225</text_data><comment_date>2018-07-31T00:00:00</comment_date></row><row _id="row-4gez.abd6~kjan" _uuid="00000000-0000-0000-42A6-8A27C04240C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4gez.abd6~kjan"><intent_id>518741</intent_id><project_id>690332</project_id><text_data>In order for us to consider whether the residential rate is appropriately applied, please specifically answer the following questions about the facility: #1 - Is the structure a single family dwelling, duplex, apartment, condominium or other residential structure?  Each structure is a single family dwelling. #2 - Including any basement or garage, how many stories or levels does the structure have?Most houses are one or two stories with garages #3 - What is the facility used for? --Answer �yes� or �no� to each of the following options: (a) Permanent residence only? (b) Rehabilitation house? (c) Transitional housing? (d) Communal dining facility? (e) Treatment services? (f) Counseling? (g) Other?  All are permanent residence houses#4 - Does each dwelling unit have its own self-contained kitchen? yes#5 - Does each dwelling unit have its own bathroom? yes #6 - Is there a community facility or manager�s office on site? no#7 - Is any part of the facility used by members of the public? no2707 W. Broad Spokane 9920540414 N Newport # 54 Elk 990094208 N Hawthorne Spokane 992058020 E Glass Spokane 9921220207 E. Nora Greenacres 990162207 E. Longfellow Spokane 992073912 E. Vulcan Mead 9902111920 E. Mansfield #59 Spokane 992065011 N. Crestline Spokane 992072524 W. Olympic Spokane 992052213 N. Vista Spokane 99212308 W. Longfellow Spokane 9920510510 W. Richland #37 Cheney 990044027 N. Martin Spokane 992071407 N. Caufield Ct Liberty Lake 990162807 E. 5th Spokane 992021723 W. Montgomery Spokane 992051123 W. Sharp Spokane 99201402 W. Portland Fairfield 99012</text_data><comment_date>2012-07-09T00:00:00</comment_date></row><row _id="row-erd4_uk6j_s72g" _uuid="00000000-0000-0000-447F-81CA806D57D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-erd4_uk6j_s72g"><intent_id>797392</intent_id><project_id>805498</project_id><text_data>Filed by Martin Stoller</text_data><comment_date>2016-10-21T00:00:00</comment_date></row><row _id="row-qw8a_pe8w-vt7u" _uuid="00000000-0000-0000-D75B-87B8C9645BBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qw8a_pe8w-vt7u"><intent_id>543355</intent_id><project_id>696647</project_id><text_data>ICON 120125</text_data><comment_date>2012-11-06T00:00:00</comment_date></row><row _id="row-gwux_c7gu~ed4f" _uuid="00000000-0000-0000-18E1-7545BAF9B1BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gwux_c7gu~ed4f"><intent_id>705281</intent_id><project_id>751575</project_id><text_data>HEAVY HAUL TRUCKS HAULING CONCRETE BRIDGE GIRDERS WITH STEER TRAILERS</text_data><comment_date>2015-07-06T00:00:00</comment_date></row><row _id="row-8k6r-vw7d.5f4m" _uuid="00000000-0000-0000-721F-DB8DC6866D1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8k6r-vw7d.5f4m"><intent_id>718390</intent_id><project_id>771410</project_id><text_data>Audiovisual  Installation of Videoconferencing System in Courtroom</text_data><comment_date>2015-09-02T00:00:00</comment_date></row><row _id="row-i4gn.mxjm.bmuf" _uuid="00000000-0000-0000-5BCF-23FD6181DB58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i4gn.mxjm.bmuf"><intent_id>630473</intent_id><project_id>735293</project_id><text_data>This project involves the removal of invasive plants (ie hand grub or chemical application) in a given Park; apply any erosion control that may be needed, (ie wood straw, jute, grass seed and or coir logs); plant native plants by hand; install a simple temporary irrigation to hand water new plants. All work is by hand no equipment other than hand equipment is required.</text_data><comment_date>2014-05-20T00:00:00</comment_date></row><row _id="row-ye4u.yxqq.wz6t" _uuid="00000000-0000-0000-F043-77F3AFA74030" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ye4u.yxqq.wz6t"><intent_id>1009015</intent_id><project_id>888283</project_id><comment_date>2019-09-22T00:00:00</comment_date></row><row _id="row-5dar~gxwd_trn3" _uuid="00000000-0000-0000-DB7F-39E6B837AF24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5dar~gxwd_trn3"><intent_id>634933</intent_id><project_id>724784</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-06-20T00:00:00</comment_date></row><row _id="row-6y6k-baxc_g8mn" _uuid="00000000-0000-0000-3F3A-1CF0469DE217" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6y6k-baxc_g8mn"><intent_id>770859</intent_id><project_id>795440</project_id><text_data>1.Minor home repair. 2. SFR 3.One 4a,b no c, yes d,e,f,g,h,i,j no 5,6 yes 7,8, no.</text_data><comment_date>2016-06-26T00:00:00</comment_date></row><row _id="row-3x6p_ev9g.uyv6" _uuid="00000000-0000-0000-F749-57FF8562180E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3x6p_ev9g.uyv6"><intent_id>1500253</intent_id><project_id>1164698</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12).L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates. The use of on-call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2025-02-11T00:00:00</comment_date></row><row _id="row-cnta-zz77-e4xr" _uuid="00000000-0000-0000-1921-F5A9D7522C23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cnta-zz77-e4xr"><intent_id>670761</intent_id><project_id>751207</project_id><text_data>#1) Install ductless heat pump #2) Single Family Dwelling #3) Single Level #4) a) no b) no c) no d) no e) no f) no g) no h) no i) no j) no k) no #5 ) yes #6) yes #7) no #8) no</text_data><comment_date>2014-12-19T00:00:00</comment_date></row><row _id="row-pbmw~4mrb.h4wb" _uuid="00000000-0000-0000-B116-1A7917528C1F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbmw~4mrb.h4wb"><intent_id>1173471</intent_id><project_id>977254</project_id><text_data>Project# 03322, Frost, Patsy, 7012 E 5th, Spokane Valley, WA  99212</text_data><comment_date>2021-08-30T00:00:00</comment_date></row><row _id="row-buvj.8mjc.9izq" _uuid="00000000-0000-0000-3326-DC33CA10FA68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-buvj.8mjc.9izq"><intent_id>682119</intent_id><project_id>756929</project_id><text_data>Contract Number: PORT0714</text_data><comment_date>2015-03-05T00:00:00</comment_date></row><row _id="row-zqfd_4gjz-hqa8" _uuid="00000000-0000-0000-C3FC-D542C8DCDEC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zqfd_4gjz-hqa8"><intent_id>924782</intent_id><project_id>857103</project_id><text_data>3180060 - 1st Floor ESD TI</text_data><comment_date>2018-08-10T00:00:00</comment_date></row><row _id="row-5vgf.xuhx-2ba4" _uuid="00000000-0000-0000-BAD9-DC352859359B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vgf.xuhx-2ba4"><intent_id>1270437</intent_id><project_id>955130</project_id><text_data>Delivery &amp; installation of lockers</text_data><comment_date>2022-09-28T00:00:00</comment_date></row><row _id="row-9rm7-wudt_pxtn" _uuid="00000000-0000-0000-6743-F3C29EEF1689" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9rm7-wudt_pxtn"><intent_id>485950</intent_id><project_id>675526</project_id><text_data>311399.008</text_data><comment_date>2011-10-26T00:00:00</comment_date></row><row _id="row-5n25~hwxr-u5sn" _uuid="00000000-0000-0000-9B11-D92659219EBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5n25~hwxr-u5sn"><intent_id>1102065</intent_id><project_id>930644</project_id><text_data>WRI Job # 20.060</text_data><comment_date>2020-11-09T00:00:00</comment_date></row><row _id="row-zxq8.8dua~qmfw" _uuid="00000000-0000-0000-E6C3-EE0217363D52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxq8.8dua~qmfw"><intent_id>677545</intent_id><project_id>751785</project_id><text_data>All work will be performed in our Redmond Shop.</text_data><comment_date>2015-02-03T00:00:00</comment_date></row><row _id="row-xhv4.wt42.cicy" _uuid="00000000-0000-0000-FB2B-5FAA21BF9907" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xhv4.wt42.cicy"><intent_id>516303</intent_id><project_id>688239</project_id><text_data>WE ARE AN OREGON CORPORATION AND OUR WORKERS COMP COVERS US WHILE WORKING IN WASHINGTON.</text_data><comment_date>2012-06-12T00:00:00</comment_date></row><row _id="row-pe78_mb8g_h9sw" _uuid="00000000-0000-0000-AFAD-FD365F3A7967" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pe78_mb8g_h9sw"><intent_id>1008194</intent_id><project_id>891073</project_id><text_data>3000 gallon truck mounted hydroseeder</text_data><comment_date>2019-10-10T00:00:00</comment_date></row><row _id="row-h45h~j4gm~kiii" _uuid="00000000-0000-0000-2FD7-B47F3EE4C64A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h45h~j4gm~kiii"><intent_id>980301</intent_id><project_id>871492</project_id><text_data>Truck and trailer  type ; Peterbilt semi tractor pulling a percision bellydump trailer with a GVWR of 80000 LBS, hauling HMA / Asphalt</text_data><comment_date>2019-05-29T00:00:00</comment_date></row><row _id="row-7vtu_fbxj-ywsa" _uuid="00000000-0000-0000-E029-C772861656AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7vtu_fbxj-ywsa"><intent_id>893410</intent_id><project_id>846075</project_id><text_data>Install Gibson furnace</text_data><comment_date>2018-03-17T00:00:00</comment_date></row><row _id="row-7avg_ysgh~aja6" _uuid="00000000-0000-0000-105C-C41DF9D7F33C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7avg_ysgh~aja6"><intent_id>925449</intent_id><project_id>858665</project_id><text_data>1. wall insulation, door weatherstripping, and dryer cap fixture. #2. single family dwelling. #3. One story. #4. a) no b) no c) yes d) no e) no f) no g) no h) no i) no j) no k) no. #5. yes. #6. yes. #7. no #8 no.</text_data><comment_date>2018-08-14T00:00:00</comment_date></row><row _id="row-x9se-tvh2-s3dv" _uuid="00000000-0000-0000-11AC-32348CA785F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x9se-tvh2-s3dv"><intent_id>992552</intent_id><project_id>861129</project_id><text_data>FILED BY DEBBIE MATHER</text_data><comment_date>2019-07-17T00:00:00</comment_date></row><row _id="row-cit3-ah2y~wvtq" _uuid="00000000-0000-0000-6972-FBCD75E92F05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cit3-ah2y~wvtq"><intent_id>1174822</intent_id><project_id>971476</project_id><text_data>Labor and materials for installation of low voltage cabling for CCTV / Video</text_data><comment_date>2021-09-02T00:00:00</comment_date></row><row _id="row-6seg.bni3-tdex" _uuid="00000000-0000-0000-7251-F681894E9512" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6seg.bni3-tdex"><intent_id>947063</intent_id><project_id>867035</project_id><text_data>security camera system</text_data><comment_date>2018-11-21T00:00:00</comment_date></row><row _id="row-d2kj~jguu-jy4y" _uuid="00000000-0000-0000-0682-3DE5D1F1BC99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d2kj~jguu-jy4y"><intent_id>1097354</intent_id><project_id>936994</project_id><text_data>Annualized credit taken for fringes against the base rate.</text_data><comment_date>2020-10-20T00:00:00</comment_date></row><row _id="row-5pa7.qc7h~znzj" _uuid="00000000-0000-0000-B8DD-67D789354D8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5pa7.qc7h~znzj"><intent_id>697383</intent_id><project_id>762031</project_id><text_data>Form filed by:  Chryste Carlson</text_data><comment_date>2015-05-29T00:00:00</comment_date></row><row _id="row-jbjb-kvqf.6tki" _uuid="00000000-0000-0000-0C59-696C984A8F75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jbjb-kvqf.6tki"><intent_id>1189056</intent_id><project_id>985648</project_id><text_data>Technician arrived on site and completed preventative maintenance on compactor. Removed the migrated debris from behind and under the ram. Greased the unit. Checked pressures all electrical connections. Checked hydraulic fittings and hoses. Oil level was low, added (1) gallon hydraulic oil. Tested functions and found no other issues.</text_data><comment_date>2021-10-28T00:00:00</comment_date></row><row _id="row-r4hx_dgcj-wg6i" _uuid="00000000-0000-0000-72FF-1FAB7ACE2F9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r4hx_dgcj-wg6i"><intent_id>909539</intent_id><project_id>852722</project_id><text_data>1806-0713-VALLEY COMMUNICATIONS CENTER-BF REPAIR</text_data><comment_date>2018-06-07T00:00:00</comment_date></row><row _id="row-ef5b-iiuk-sy5m" _uuid="00000000-0000-0000-E8A6-CD09ABC0BC75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ef5b-iiuk-sy5m"><intent_id>532173</intent_id><project_id>689946</project_id><text_data>No journeymen will be working on the project.</text_data><comment_date>2012-08-31T00:00:00</comment_date></row><row _id="row-u2s8_gx68-fhbv" _uuid="00000000-0000-0000-50B5-85165C091491" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u2s8_gx68-fhbv"><intent_id>830370</intent_id><project_id>791216</project_id><text_data>The clean up laborer swept floors and gathered up concrete form materials. She used a broom and dust pan.</text_data><comment_date>2017-05-05T00:00:00</comment_date></row><row _id="row-8ner-97k2_pg9t" _uuid="00000000-0000-0000-A261-30834A353985" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ner-97k2_pg9t"><intent_id>546921</intent_id><project_id>663706</project_id><text_data>NO</text_data><comment_date>2012-12-03T00:00:00</comment_date></row><row _id="row-fg4a-cq6b.qii6" _uuid="00000000-0000-0000-9EFB-4D3765E86086" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fg4a-cq6b.qii6"><intent_id>1178752</intent_id><project_id>979933</project_id><text_data>Project# 03367, Jackson, Wesley, 11612 N Sheridan St, Lot E11, Mead, WA 99021</text_data><comment_date>2021-09-29T00:00:00</comment_date></row><row _id="row-teqp_saq2.mdsd" _uuid="00000000-0000-0000-C6A9-C0E96778CA5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-teqp_saq2.mdsd"><intent_id>1239059</intent_id><project_id>1016386</project_id><text_data>SRO 1917008</text_data><comment_date>2022-06-06T00:00:00</comment_date></row><row _id="row-kezd.cd4u_geuj" _uuid="00000000-0000-0000-8376-F7B2855FC8B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kezd.cd4u_geuj"><intent_id>1056780</intent_id><project_id>854790</project_id><text_data>Installation of wire partitions. Use of basic hand tools and a rotohammer.</text_data><comment_date>2020-05-14T00:00:00</comment_date></row><row _id="row-7jgz.xz64-ir4b" _uuid="00000000-0000-0000-7C8D-99723F5E26B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7jgz.xz64-ir4b"><intent_id>1206012</intent_id><project_id>996166</project_id><text_data>Worker 1: Fringe $32.94 = Vacation/Leave $4.00; Assessment Check Off $1.30; Health Trust [Health + Welfare + Dental] $9.01; Washington State Pension Fund $8.56; National Pension Fund $2.49; International Training Fund $0.10; Industry Improvement Trust $0.50; 'JATC' Joint Apprenticeship and Training Committee $1.98; Supplemental Pension $5.00.Worker 2: Fringe $31.48 = NW Sheet Metal Workers Pension $10.00; Local Apprenticeship Fund $1.10; Healthcare /VEB [Health, Dental, Vision, Accidental Death Insurance $11.85] + Extended $0.43 + VEBA $1.03 + RSF $0.15; Organizational Trust Fund $1.00; Industry Fund $0.65; National Pension Contribution $4.24; (ITI) International Training Institute for the Sheet Metal and Air Conditioning Industry $0.12; (NEMI) National Energy Management Institute $0.03; (SMOHI) Sheet Metal Occupational Health Institute Trust $0.02; NW Supplemental Plan $0.79; Clean Card $0.07</text_data><comment_date>2022-02-09T00:00:00</comment_date></row><row _id="row-8k43~zrne.kkhs" _uuid="00000000-0000-0000-D24A-EE9756B7683B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8k43~zrne.kkhs"><intent_id>534187</intent_id><project_id>691299</project_id><text_data>The entire project is a group of improvements to a public park. Puget Sound Landscaping's portion is to hydroseed and to install permanent irrigation in the park area. We will not be supplying soil or drainage systems. We will not be working on the road portions of the project. We will use trenchers, shovels, rakes, picks and wheelbarrows. We will also be using a hydroseeder.</text_data><comment_date>2012-09-13T00:00:00</comment_date></row><row _id="row-2evt~yheb-s7ij" _uuid="00000000-0000-0000-E1DC-96340C7138CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2evt~yheb-s7ij"><intent_id>1142976</intent_id><project_id>961470</project_id><text_data>303846</text_data><comment_date>2021-05-07T00:00:00</comment_date></row><row _id="row-rpa2.q5cm-6mtr" _uuid="00000000-0000-0000-2467-AF6BE73A6EFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rpa2.q5cm-6mtr"><intent_id>714908</intent_id><project_id>762404</project_id><text_data>Irrigation or Lawn Sprinkler Installers � Lawn sprinkler modification and adjustmentsLandscaping or Planting Laborers � Lawn and landscape restoration</text_data><comment_date>2015-08-17T00:00:00</comment_date></row><row _id="row-8ygb.cima_6buz" _uuid="00000000-0000-0000-65A2-762D931BFE4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ygb.cima_6buz"><intent_id>1062473</intent_id><project_id>884211</project_id><text_data>Davis Bacon Rates</text_data><comment_date>2020-06-03T00:00:00</comment_date></row><row _id="row-fqwb-3kj7_juvg" _uuid="00000000-0000-0000-681F-43ABE8FD4893" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fqwb-3kj7_juvg"><intent_id>757868</intent_id><project_id>789559</project_id><text_data>The old quick couplers will be taken out by hand and re-installed by hand to upgrade the irrigation in place.  Hand tools could be used such as rakes, shovels, wheelbarrow, and also a compactor under 90 Hph will used when placing the dirt back on top.  Turf cool boxes (have no heating or cooling, they are aluminum boxes built for turf sports fields) will take the place of the original valve boxes because they are more durable.  A backpack blower will possibly be used for additional clean up.</text_data><comment_date>2016-04-27T00:00:00</comment_date></row><row _id="row-eygp.xjme-qi2d" _uuid="00000000-0000-0000-9D97-61DB8DF071D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eygp.xjme-qi2d"><intent_id>951426</intent_id><project_id>866550</project_id><text_data>HM Job #4110 PM:G.Fox</text_data><comment_date>2018-12-18T00:00:00</comment_date></row><row _id="row-zfax_j6yr-mzt6" _uuid="00000000-0000-0000-B1C9-CF1CD9E7B823" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zfax_j6yr-mzt6"><intent_id>509149</intent_id><project_id>686539</project_id><text_data>Filed by: Bill Wheeler</text_data><comment_date>2012-04-25T00:00:00</comment_date></row><row _id="row-uzjj_fywx.ukqi" _uuid="00000000-0000-0000-AFC0-5C559A39EE64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzjj_fywx.ukqi"><intent_id>888734</intent_id><project_id>843946</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2018-02-16T00:00:00</comment_date></row><row _id="row-6uxb-z7x9~fgji" _uuid="00000000-0000-0000-7E28-708BC1238B69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6uxb-z7x9~fgji"><intent_id>505261</intent_id><project_id>684811</project_id><text_data>Clean transformer vault contaminated with PCB oilMotorPatGrader to vacuum materials in vault, General Laborers and Haz Waste Workers to clean smalldebris, using brooms, shovels and small hand tools</text_data><comment_date>2012-03-26T00:00:00</comment_date></row><row _id="row-fw4t~ievy_huft" _uuid="00000000-0000-0000-7B32-58A3273F8152" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fw4t~ievy_huft"><intent_id>493115</intent_id><project_id>679775</project_id><text_data>All address are locate in the city of Tacoma.1.  Miller Peggie    4622 South M. Street2.  Minott Dennis    7838 South Cushman Ave,3.  Camacho Emilia    6101 East M. Street</text_data><comment_date>2011-12-12T00:00:00</comment_date></row><row _id="row-prpg_ihfb.v4kd" _uuid="00000000-0000-0000-972C-762B9D2E23E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prpg_ihfb.v4kd"><intent_id>537074</intent_id><project_id>695636</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-05T00:00:00</comment_date></row><row _id="row-wpv7_vnq6-rcdr" _uuid="00000000-0000-0000-E97B-FF0065B56397" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wpv7_vnq6-rcdr"><intent_id>558255</intent_id><project_id>704969</project_id><text_data>$21.63 Fringe Breakout: Local Pens $8.29, Nation Pens $1.51, H&amp;W $8.58, Pref Retire H&amp;W $1.77, Train Trust $1.05, PMCA $.20, Scholarship $.07, Education $.16.</text_data><comment_date>2013-03-05T00:00:00</comment_date></row><row _id="row-5tqx.dain.4zap" _uuid="00000000-0000-0000-1884-E6EDF0DB9134" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5tqx.dain.4zap"><intent_id>453477</intent_id><project_id>665122</project_id><text_data>Truck Drivers: Other Trucks $35.38 is 4000 gallon Water Truck; Lowboy</text_data><comment_date>2011-04-28T00:00:00</comment_date></row><row _id="row-f5vc-wngu-xkbf" _uuid="00000000-0000-0000-A0F6-8D2A2807FE77" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f5vc-wngu-xkbf"><intent_id>928073</intent_id><project_id>859610</project_id><text_data>KCDA</text_data><comment_date>2018-08-24T00:00:00</comment_date></row><row _id="row-ewe8~hwuq_v7n4" _uuid="00000000-0000-0000-D46C-56E725CF6661" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ewe8~hwuq_v7n4"><intent_id>672464</intent_id><project_id>752016</project_id><text_data>Technicians remove and disassemble microwave dishes that are located outdoors (one on a rooftop and one on a self supporting tower).  Once disassembled, the technicians will change the polarity of the microwave dishes by turning the feed horns.  Once complete, the technicians then reassemble the dishes, attach the coax cabling and install them in their previous locations.</text_data><comment_date>2015-01-09T00:00:00</comment_date></row><row _id="row-gfwh~2eka~3nce" _uuid="00000000-0000-0000-0DD3-9C453CFD4A4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfwh~2eka~3nce"><intent_id>1254267</intent_id><project_id>1023656</project_id><text_data>General Labor: shovel work, clean-up, project layout</text_data><comment_date>2022-08-02T00:00:00</comment_date></row><row _id="row-5aff.q4vb_qjn9" _uuid="00000000-0000-0000-27CE-CE52663090ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5aff.q4vb_qjn9"><intent_id>882941</intent_id><project_id>841272</project_id><text_data>Care for the lawns and planting beds. We will be using lawn mowers, grass edgers, line trimmers, back pack blowers, rakes, gas powered hedge shears, and hand pruners. This is all to care for the existing vegetation on the properties.</text_data><comment_date>2018-01-11T00:00:00</comment_date></row><row _id="row-4388_umcm.uqs8" _uuid="00000000-0000-0000-C41F-6C7978583637" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4388_umcm.uqs8"><intent_id>757665</intent_id><project_id>788250</project_id><text_data>086034</text_data><comment_date>2016-04-20T00:00:00</comment_date></row><row _id="row-wmpt_879v~q6ty" _uuid="00000000-0000-0000-1743-1AE005F837FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wmpt_879v~q6ty"><intent_id>1171728</intent_id><project_id>975621</project_id><text_data>GU Job #21242Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2021-08-24T00:00:00</comment_date></row><row _id="row-pd27_iztd.ek2x" _uuid="00000000-0000-0000-96D5-F9A18335ABB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pd27_iztd.ek2x"><intent_id>1207285</intent_id><project_id>996995</project_id><text_data>This is a warranty call. No cost to the customer. No PO issued.</text_data><comment_date>2022-01-26T00:00:00</comment_date></row><row _id="row-fx9d_tfau.yr9z" _uuid="00000000-0000-0000-23D4-07297BDF14B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fx9d_tfau.yr9z"><intent_id>1036073</intent_id><project_id>805387</project_id><text_data>We do ongoing work at the Cedar River Facility for CH2M Hill. They have had the maintenance contract there for many years.  This is the correct information.</text_data><comment_date>2020-03-03T00:00:00</comment_date></row><row _id="row-8zvv-dv5z-kihv" _uuid="00000000-0000-0000-49EF-A79498FA22A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zvv-dv5z-kihv"><intent_id>507500</intent_id><project_id>685842</project_id><text_data>This contract is for Landscape Maintenance at Si View &amp; Shamrock Parks in the city of North Bend. This project to consist of mowing, trimming, edging, bed care, pruning &amp; leaf fall removal in the parks. Equipment to be used includes walk behind lawnmowers, weed eaters, pruning shears, back pack blowers, rakes, shovels, buckets &amp; hoes as required to complete the maintenance of the established planting &amp; turf areas for these City of North Bend Parks.This service is on a set schedule weekly from March 1 through November 30 and bi-weekly for the month of November.</text_data><comment_date>2012-04-12T00:00:00</comment_date></row><row _id="row-r6s4-h2ms.yhr7" _uuid="00000000-0000-0000-B1D8-E4DBA6672D52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r6s4-h2ms.yhr7"><intent_id>1130700</intent_id><project_id>950465</project_id><text_data>Salvage &amp; Demo of Chilkat</text_data><comment_date>2021-03-23T00:00:00</comment_date></row><row _id="row-t3d9.chj7~msi8" _uuid="00000000-0000-0000-AA0E-3835C79C30B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3d9.chj7~msi8"><intent_id>1184610</intent_id><project_id>983145</project_id><text_data>yes I understand the difference between the maintenance and construction aspect of categories</text_data><comment_date>2021-10-11T00:00:00</comment_date></row><row _id="row-kqbu~qvjb.nszd" _uuid="00000000-0000-0000-0DC7-04CFFFEBDEED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kqbu~qvjb.nszd"><intent_id>918849</intent_id><project_id>856175</project_id><text_data>HIRING CONTRACTOR:CITY OF SEATTLE, TRANSPORTATION</text_data><comment_date>2018-07-18T00:00:00</comment_date></row><row _id="row-rjvw.gwj7~f2pa" _uuid="00000000-0000-0000-B64B-FD6E4FF41DC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rjvw.gwj7~f2pa"><intent_id>725245</intent_id><project_id>673648</project_id><text_data>We have examined our fringe rate and confirm it includes only benefits allowable under WAC 296-127-014.  The fringes include only the following:  an employer provided health plan, employer-paid life insurance, actual used vacation (not accrued), holidays, and contributions to the trust associated with an IRS-approved, trustee-managed ERISA pension plan.  Hourly fringe benefits consist of $3.65 Medical, $0.25 Life, $0.75 Vacation, $0.50 Holiday and the remaining to Pension.</text_data><comment_date>2015-10-08T00:00:00</comment_date></row><row _id="row-stc3~wegz_h4f5" _uuid="00000000-0000-0000-813C-E146BBF59F3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-stc3~wegz_h4f5"><intent_id>1286556</intent_id><project_id>1042688</project_id><text_data>9906116</text_data><comment_date>2022-11-30T00:00:00</comment_date></row><row _id="row-djit~fgy5.f2xe" _uuid="00000000-0000-0000-CF68-0B5AB351D57F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-djit~fgy5.f2xe"><intent_id>1114050</intent_id><project_id>945911</project_id><text_data>Subcontractor: Teknon</text_data><comment_date>2021-01-08T00:00:00</comment_date></row><row _id="row-h63c.kreg_52h3" _uuid="00000000-0000-0000-4F47-00A682D2462B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h63c.kreg_52h3"><intent_id>1415921</intent_id><project_id>1112656</project_id><text_data>H&amp;W $9.67, Pension $15.15, Training $.75</text_data><comment_date>2024-04-09T00:00:00</comment_date></row><row _id="row-4y9m.p2jh-yyyf" _uuid="00000000-0000-0000-B5A1-68E2C63E0134" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4y9m.p2jh-yyyf"><intent_id>764640</intent_id><project_id>793034</project_id><text_data>PTI SO 126948</text_data><comment_date>2016-05-26T00:00:00</comment_date></row><row _id="row-uy8g-bfjn_sarx" _uuid="00000000-0000-0000-110D-4DEC6F5BE4C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uy8g-bfjn_sarx"><intent_id>610299</intent_id><project_id>726531</project_id><text_data>Installation/construction of 2 fiber cable runs @ Puyallup city hall.</text_data><comment_date>2014-01-03T00:00:00</comment_date></row><row _id="row-hb9c_pycw~j4mp" _uuid="00000000-0000-0000-93B0-03F1DF7FD570" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hb9c_pycw~j4mp"><intent_id>657817</intent_id><project_id>745605</project_id><text_data>TELECOMMUNICATIONS BASIS OF WORK OPTION 1Interbay Cabling � TRADITIONAL OPTION? Provide and install OM3 Fiber Optic Cabling to consist of the following components from Network Rack 8 to all (10) of the Server Pod cabinets:? (1) 24-Strand OM3 Multi-Mode Riser Rated Fiber to be field terminated with LC/PC Connectors on each end.? (1) 4RU Ortronics LIU with (10) 24-Fiber LC Coupler Plates and (2) Blank Plates in Network Rack 8 for terminated fiber to land into.? (1) 1RU Ortronics LIU with (1) 24-Fiber LC Coupler Plate and (2) Blank Plates into each of the (10) Server Pod cabinets.? Terminate, test, label according to TIA/EIA/Industry and Stanwood School Districts Standards.ADD/ALT Interbay Cabling � TRADITIONAL OPTION? Provide and install OM3 Fiber Optic Cabling to consist of the following components from Network Rack 8 to both of the Storage cabinets:? (1) 24-Strand OM3 Multi-Mode Riser Rated Fiber to be field terminated with LC/PC Connectors on each end.? (1) 1RU Ortronics LIU with (1) 24-Fiber LC Coupler Plate and (2) Blank Plates into each of the Storage cabinets.? Terminate, test, label according to TIA/EIA/Industry and Stanwood School Districts Standards.</text_data><comment_date>2014-10-01T00:00:00</comment_date></row><row _id="row-6ykh_jh5n.9btx" _uuid="00000000-0000-0000-046E-9B5EB90EBC58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ykh_jh5n.9btx"><intent_id>1024424</intent_id><project_id>865181</project_id><text_data>Providing the beautification of an area using a slinger/conveyor truck. Placing material in designated areas.</text_data><comment_date>2019-12-02T00:00:00</comment_date></row><row _id="row-9xue~tzsw~6mi5" _uuid="00000000-0000-0000-7D26-4356CD43DD2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9xue~tzsw~6mi5"><intent_id>714832</intent_id><project_id>770095</project_id><text_data>1.L &amp; M to install ductless heat pump, and electrical.  2.single family. 3.   4.a.no b no c.yes d.no e.no f.no g.no h.no i.no  5.yes 6.yes  7no  8no</text_data><comment_date>2015-08-17T00:00:00</comment_date></row><row _id="row-bci4_igte-bepg" _uuid="00000000-0000-0000-574F-9C8FED56D154" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bci4_igte-bepg"><intent_id>633509</intent_id><project_id>734398</project_id><text_data>Kim Burnside</text_data><comment_date>2014-06-05T00:00:00</comment_date></row><row _id="row-n3f4-y65u-kit7" _uuid="00000000-0000-0000-DD78-D77827605516" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n3f4-y65u-kit7"><intent_id>1272464</intent_id><project_id>1034186</project_id><text_data>IFS WO# 132439, City of Bellevue, work around station ground, Cleaning out weeds and installing gravel by hand.</text_data><comment_date>2022-10-05T00:00:00</comment_date></row><row _id="row-g7b9-w274~3j3c" _uuid="00000000-0000-0000-9CD3-95C543A784B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g7b9-w274~3j3c"><intent_id>1241765</intent_id><project_id>1017887</project_id><text_data>sewer repair</text_data><comment_date>2022-06-16T00:00:00</comment_date></row><row _id="row-cvyt-26ji.9ppx" _uuid="00000000-0000-0000-7113-804B891070D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cvyt-26ji.9ppx"><intent_id>581290</intent_id><project_id>715531</project_id><text_data>SV17561</text_data><comment_date>2013-07-16T00:00:00</comment_date></row><row _id="row-yt26_uej6~mzxp" _uuid="00000000-0000-0000-65F8-D340ED32866F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yt26_uej6~mzxp"><intent_id>1242642</intent_id><project_id>1010957</project_id><text_data>'other trucks' = lowbed, mobilization of equipment (Teamster's Union)'General Laborer = hand shovel rock and asphalt (Laborer's Union)</text_data><comment_date>2022-06-20T00:00:00</comment_date></row><row _id="row-imyj~27h7.h34e" _uuid="00000000-0000-0000-DE27-6571E635B458" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imyj~27h7.h34e"><intent_id>584004</intent_id><project_id>715662</project_id><text_data>Filed by Gary Liles</text_data><comment_date>2013-07-29T00:00:00</comment_date></row><row _id="row-3kh6~wvgu.3m3u" _uuid="00000000-0000-0000-E855-17250E0A058E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3kh6~wvgu.3m3u"><intent_id>752671</intent_id><project_id>787830</project_id><text_data>The scope of work for this project is to provide and install CAT6 cabling for the telephone and data system.  Data will be used for desk top computers. All work will be performed inside.</text_data><comment_date>2016-03-22T00:00:00</comment_date></row><row _id="row-4z8s-c5u7~k9sf" _uuid="00000000-0000-0000-3957-73D6862DFCB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4z8s-c5u7~k9sf"><intent_id>620158</intent_id><project_id>730881</project_id><text_data>Job 63518</text_data><comment_date>2014-03-13T00:00:00</comment_date></row><row _id="row-kw8a.8nk8.danw" _uuid="00000000-0000-0000-6FBF-4C238376EBB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kw8a.8nk8.danw"><intent_id>1077844</intent_id><project_id>924727</project_id><text_data>Employees on a different job. Owners completed this small job.</text_data><comment_date>2020-08-05T00:00:00</comment_date></row><row _id="row-xh3r-qwc4_r64f" _uuid="00000000-0000-0000-9A87-C813A84AE39B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xh3r-qwc4_r64f"><intent_id>844658</intent_id><project_id>826011</project_id><text_data>other truck lowboy- other truck water truck</text_data><comment_date>2017-06-30T00:00:00</comment_date></row><row _id="row-rzz9.4q6i~ddki" _uuid="00000000-0000-0000-4298-9B1F48AF22B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzz9.4q6i~ddki"><intent_id>1491954</intent_id><project_id>1159226</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. BCI Project No. ES2081</text_data><comment_date>2024-12-04T00:00:00</comment_date></row><row _id="row-kyxe-ea2c~izjf" _uuid="00000000-0000-0000-924D-3A7E622E106E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kyxe-ea2c~izjf"><intent_id>539559</intent_id><project_id>691055</project_id><text_data>This project entails site and building construction to support the installation of 4 portable buildings. The portable buildings and their foundations are provided under a seperate contract and are not a part of this work. Excavation and backfill for the portable foundations is included in this contract. Some electrical/ telecom work will take palce within the portables as a part of this contract, once the portables have been placed. A covered shared learning area is to be site constructed as part of this contract, maintain the existing operational schools during construction. There is minor off-site work in the Right of Way anticipated with this project. The work includes, civil, landscaping, architectural, structural, electrical systems and all necessary and required work. Our portion: Owner/ Operator will perform work involving a mini excavator for trenching (18&amp;quot; deep) for irrigation and back filling trenches. All topsoil and bark will be spread using hand tools ( wheel burrow, shovels and rakes) Planting of all trees, shrubs and ground cover will be done using shovels.</text_data><comment_date>2012-11-30T00:00:00</comment_date></row><row _id="row-m478.eeac-aeac" _uuid="00000000-0000-0000-25FB-746C4AA74389" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m478.eeac-aeac"><intent_id>1128332</intent_id><project_id>847667</project_id><text_data>Tunista is filing on behalf of Global Concrete Cutting due to ceased operations.Global Concrete Cutting UBI 603081735 Cont. Reg. CLOBACC894CG 10011 Bridgeport Way SW, Ste1500-374, Lakewood, WA 98499 (253) 255-6379</text_data><comment_date>2021-03-12T00:00:00</comment_date></row><row _id="row-83cc~cdpg.8z49" _uuid="00000000-0000-0000-8736-3C1C1E3514FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-83cc~cdpg.8z49"><intent_id>860283</intent_id><project_id>806741</project_id><text_data>STONEWAY CONCRETE IS A MATERIAL SUPPLIER</text_data><comment_date>2017-09-01T00:00:00</comment_date></row><row _id="row-beqb.5u5s.c6cy" _uuid="00000000-0000-0000-40E7-D21E23A1417B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-beqb.5u5s.c6cy"><intent_id>1119897</intent_id><project_id>938958</project_id><text_data>*ECB Corp dba Omniduct**ECB Corp is a fabrication shop only and does not require a contractor�s license***All work is performed off-site in shop at 1515 75th St SW, Everett, WA</text_data><comment_date>2021-02-03T00:00:00</comment_date></row><row _id="row-awfp_ggbw-aidg" _uuid="00000000-0000-0000-C9F6-54A71C2EA37F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-awfp_ggbw-aidg"><intent_id>1290287</intent_id><project_id>1045037</project_id><text_data>Filter changes and equipment check on 4 air handlers and 1 AC unit.</text_data><comment_date>2022-12-15T00:00:00</comment_date></row><row _id="row-s6by_e45p.54ar" _uuid="00000000-0000-0000-46AD-F1EF61A1EEED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s6by_e45p.54ar"><intent_id>1037124</intent_id><project_id>907680</project_id><text_data>1- Insulate Attic, Floor, &amp; Ceiling, Install Vapor barrier, Insulate ducts &amp; water supply pipes, install new backdoor, air seal, install 4 smoke detectors &amp; 1 co detectors, revent dryer, plumb prv valve, install new bathfan w/timer, clean and tune hvac2- Single Family3- 2 levels4A- No4B- No4C- Yes4D- No4E- No4F- No4G- No4H- No4I- No4J- No4K- No5- Yes6- Yes7- No8- No</text_data><comment_date>2020-02-10T00:00:00</comment_date></row><row _id="row-xz9n-kf9d.s9ii" _uuid="00000000-0000-0000-DFF9-A9958BD10B0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xz9n-kf9d.s9ii"><intent_id>1065352</intent_id><project_id>922407</project_id><text_data>9852836   11890</text_data><comment_date>2020-06-15T00:00:00</comment_date></row><row _id="row-q4ge.segz~uayj" _uuid="00000000-0000-0000-0C2A-298E2463E8AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q4ge.segz~uayj"><intent_id>679640</intent_id><project_id>748937</project_id><text_data>1) INSULATION, 2)HOME)3)1,4A NO,4B NO,4C YES,4D NO,</text_data><comment_date>2015-02-18T00:00:00</comment_date></row><row _id="row-r6b6.f4xj~4fj4" _uuid="00000000-0000-0000-E919-74182CF782B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r6b6.f4xj~4fj4"><intent_id>1160284</intent_id><project_id>970654</project_id><text_data>Project# 03277, Slater, Shirly, 1804 W Mission Ave, Spokane WA 99021</text_data><comment_date>2021-08-23T00:00:00</comment_date></row><row _id="row-45yb.h73c~a2rq" _uuid="00000000-0000-0000-43B1-1512B5380D16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-45yb.h73c~a2rq"><intent_id>1162709</intent_id><project_id>971905</project_id><text_data>Job # 108-102258</text_data><comment_date>2021-07-22T00:00:00</comment_date></row><row _id="row-bek4-3zta~wf2u" _uuid="00000000-0000-0000-A256-D5BFBE47E9BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bek4-3zta~wf2u"><intent_id>1128508</intent_id><project_id>954138</project_id><text_data>Prime Job # 1008212</text_data><comment_date>2021-03-12T00:00:00</comment_date></row><row _id="row-hnja_45ei~v4ee" _uuid="00000000-0000-0000-B2D7-39A71EB7BA20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hnja_45ei~v4ee"><intent_id>1055424</intent_id><project_id>917733</project_id><text_data>1) Weatherization2) single family dwelling/residential3) one4) all no except for C YES5) yes6) yes7) no8) no</text_data><comment_date>2020-05-02T00:00:00</comment_date></row><row _id="row-hjdf_pret-yt92" _uuid="00000000-0000-0000-09D2-44E688A8111F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjdf_pret-yt92"><intent_id>1154864</intent_id><project_id>967845</project_id><text_data>This project does not have federal funding. The intent needs to be changed to reflect this.</text_data><comment_date>2021-08-09T00:00:00</comment_date></row><row _id="row-6mvh-6va4~uk3j" _uuid="00000000-0000-0000-EE5A-DB610CE8F478" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6mvh-6va4~uk3j"><intent_id>661082</intent_id><project_id>739028</project_id><text_data>1114123</text_data><comment_date>2014-10-20T00:00:00</comment_date></row><row _id="row-x5en.7ws5-qgd5" _uuid="00000000-0000-0000-CE70-8BA14135521C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x5en.7ws5-qgd5"><intent_id>550888</intent_id><project_id>682458</project_id><text_data>Blew's Construction Inc is filing on behalf of Tim's Framing due to ceased operations and refusal to re-file intent with corrections</text_data><comment_date>2013-01-07T00:00:00</comment_date></row><row _id="row-6zxg~umnu.t2ga" _uuid="00000000-0000-0000-0BAA-B0B73BC329AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6zxg~umnu.t2ga"><intent_id>1007722</intent_id><project_id>893509</project_id><text_data>We were onsite working on another project when they added this in a limited PW.  I inadvertently thought this was being doing under my original intent; they have requested this separate intent, thus the delay in submitting</text_data><comment_date>2019-09-17T00:00:00</comment_date></row><row _id="row-b76s-8y83~s5ii" _uuid="00000000-0000-0000-D60E-B84E3281BBFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b76s-8y83~s5ii"><intent_id>626514</intent_id><project_id>733302</project_id><text_data>Changed from residential to commercialProject is half fire alarm and half inside journeyman</text_data><comment_date>2014-05-12T00:00:00</comment_date></row><row _id="row-wfbd.h3q3_yycn" _uuid="00000000-0000-0000-6767-5D31A0335631" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wfbd.h3q3_yycn"><intent_id>725945</intent_id><project_id>774486</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 5e for voice (telephone) and data (computer networking ) indoors</text_data><comment_date>2015-10-13T00:00:00</comment_date></row><row _id="row-hk7m_pb75~vtvw" _uuid="00000000-0000-0000-A948-CF7E233696ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hk7m_pb75~vtvw"><intent_id>1086727</intent_id><project_id>921821</project_id><text_data>Concrete block retaining wall is not constructed using motar. The 37hp mini-excavator and 45hp skid loader are being used for the construction/placement of the block retaining wall. The 18hp walk-behind trencher is being used for repairing/modifying existing irrigation system.</text_data><comment_date>2020-09-17T00:00:00</comment_date></row><row _id="row-t258~8c2i.akgk" _uuid="00000000-0000-0000-E7AA-FC6319A7E1F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t258~8c2i.akgk"><intent_id>1073560</intent_id><project_id>926063</project_id><text_data>All work will be performed by subcontractors, except for possible punch-list items and/or possible site clean-up.Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with the wage rate determined by the Secretary of HUD to be prevailing in the locality with respect to such trade or position as provided under 24 CFR 965.101(a)(2)(iv). Filed by Kathi Clark</text_data><comment_date>2020-07-20T00:00:00</comment_date></row><row _id="row-ck3g_qsxj~tr38" _uuid="00000000-0000-0000-B545-4335E622894A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ck3g_qsxj~tr38"><intent_id>505724</intent_id><project_id>685055</project_id><text_data>General Laborer - use of shovel and clean up workOther trucks - 0 to 8,000 gallon water truck used for dust control</text_data><comment_date>2012-03-28T00:00:00</comment_date></row><row _id="row-9f2z-hwb2-htvj" _uuid="00000000-0000-0000-5846-95C50A22CCD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9f2z-hwb2-htvj"><intent_id>1010601</intent_id><project_id>891114</project_id><text_data>Transport roll off bins for disposalSemi Truck and tractor to haul roll off bins for disposal</text_data><comment_date>2019-09-27T00:00:00</comment_date></row><row _id="row-w6uk.fu2t_iffw" _uuid="00000000-0000-0000-883B-E9848F0B52C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w6uk.fu2t_iffw"><intent_id>586003</intent_id><project_id>717179</project_id><text_data>The &amp;quot;Other Truck&amp;quot; is a 4 axle truck pulling a three axle flatbed trailer. This truck will be hauling logs to the other part of the job. The GVW on the truck is 98,000 lbs.</text_data><comment_date>2013-08-08T00:00:00</comment_date></row><row _id="row-xr6q-jv85-ctn2" _uuid="00000000-0000-0000-2DAE-7485AD6EDEBC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xr6q-jv85-ctn2"><intent_id>696163</intent_id><project_id>762994</project_id><text_data>RE Contractor Registration Correction:  Spoke with Jesse Jameson @ 206.835.1107 with Contractor registration LNI Unit.</text_data><comment_date>2015-06-02T00:00:00</comment_date></row><row _id="row-49rp~yxza-dah2" _uuid="00000000-0000-0000-A3F8-204DEF578840" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49rp~yxza-dah2"><intent_id>1465838</intent_id><project_id>1144677</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Low Income weatherization#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single Family#3 - Including any basement or garage, how many stories or levels does the structure have? One Story#4 - What is the building used for? -- Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(i) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO(l) Other services or uses? NO#5 - Does each dwelling unit have its own self-contained kitchen? NO#6 - Does each dwelling unit have its own bathroom? NO#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-skp6-24de~vw6t" _uuid="00000000-0000-0000-80D0-2BEEF302CA7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-skp6-24de~vw6t"><intent_id>1469423</intent_id><project_id>1146483</project_id><text_data>Feller Heating and Linder Electric will be doing the installation</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-cr2i_7rvi_gpzb" _uuid="00000000-0000-0000-29B6-75C11D747E1F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cr2i_7rvi_gpzb"><intent_id>1469199</intent_id><project_id>1146378</project_id><text_data>9953689</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-q2xs.daik.mk2g" _uuid="00000000-0000-0000-DEE3-91999FDEFCCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q2xs.daik.mk2g"><intent_id>1387296</intent_id><project_id>822014</project_id><text_data>J00212091 - Intent</text_data><comment_date>2023-12-12T00:00:00</comment_date></row><row _id="row-nksu_hn4q-txe5" _uuid="00000000-0000-0000-74B8-5346CB70FD3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nksu_hn4q-txe5"><intent_id>1469067</intent_id><project_id>1146323</project_id><text_data>MMFS - 73246927</text_data><comment_date>2024-09-21T00:00:00</comment_date></row><row _id="row-areh.ji96_7rct" _uuid="00000000-0000-0000-9159-25FBB1A75035" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-areh.ji96_7rct"><intent_id>1465496</intent_id><project_id>1078553</project_id><text_data>Fringe includes $8 H &amp; W plus $11 Pension</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-mtpr-vy4x_n6k5" _uuid="00000000-0000-0000-786D-46B5E49BC2D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mtpr-vy4x_n6k5"><intent_id>1152315</intent_id><project_id>966539</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2021-06-28T00:00:00</comment_date></row><row _id="row-b9p3_tfag~ymgk" _uuid="00000000-0000-0000-E3F8-529C7DA1B536" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9p3_tfag~ymgk"><intent_id>1012815</intent_id><project_id>895497</project_id><text_data>CHECK A LINE ON THE RJ21x.</text_data><comment_date>2019-10-08T00:00:00</comment_date></row><row _id="row-i4yp-t7pq-ywpa" _uuid="00000000-0000-0000-6CB4-6EDC3A8EA4CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i4yp-t7pq-ywpa"><intent_id>1180568</intent_id><project_id>980908</project_id><text_data>Providing the beautification of an area adjacent to a school using a blower/mulch truck. Placing certified playchips into above playgrounds.</text_data><comment_date>2021-09-24T00:00:00</comment_date></row><row _id="row-f6at.672x~fgdr" _uuid="00000000-0000-0000-3C29-F2BF52FE46A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f6at.672x~fgdr"><intent_id>714541</intent_id><project_id>769996</project_id><text_data>1.install a ductless heat pump.  2.single family  3.2  4.c.  5.yes  6.yes. 7.no  8.no</text_data><comment_date>2015-08-14T00:00:00</comment_date></row><row _id="row-4z7s-f9de-wbic" _uuid="00000000-0000-0000-F735-05C3C1075A99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4z7s-f9de-wbic"><intent_id>551410</intent_id><project_id>674911</project_id><text_data>Form filed by: Fred Benninghoff985 Carl Ave Oak Harbor WA. 98277</text_data><comment_date>2013-01-10T00:00:00</comment_date></row><row _id="row-cthf~tgyc~byga" _uuid="00000000-0000-0000-6132-76E19C930B13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cthf~tgyc~byga"><intent_id>889897</intent_id><project_id>844490</project_id><text_data>Invoice #009-98443   WO#40937</text_data><comment_date>2018-02-23T00:00:00</comment_date></row><row _id="row-e4mz.g6yu~sf3n" _uuid="00000000-0000-0000-F384-36CB26374753" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e4mz.g6yu~sf3n"><intent_id>1207173</intent_id><project_id>996917</project_id><text_data>94285/Benton County Corrections/Tilt skillet</text_data><comment_date>2022-01-26T00:00:00</comment_date></row><row _id="row-76p2.n6zp~6hyu" _uuid="00000000-0000-0000-51A5-A76C9CFB8B33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-76p2.n6zp~6hyu"><intent_id>793416</intent_id><project_id>804012</project_id><text_data>Single Stand alone IP Intercom/Video at Entrance of School</text_data><comment_date>2016-10-03T00:00:00</comment_date></row><row _id="row-see7.sicq-hykz" _uuid="00000000-0000-0000-481B-A9D42E342319" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-see7.sicq-hykz"><intent_id>1227823</intent_id><project_id>1009824</project_id><comment_date>2022-04-22T00:00:00</comment_date></row><row _id="row-pcci.wqq4.yegq" _uuid="00000000-0000-0000-87C3-D1BD080F4911" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pcci.wqq4.yegq"><intent_id>949738</intent_id><project_id>863350</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2018-12-07T00:00:00</comment_date></row><row _id="row-v8zp-m4hk~re9w" _uuid="00000000-0000-0000-F146-26D810CFC6EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8zp-m4hk~re9w"><intent_id>470289</intent_id><project_id>669299</project_id><text_data>Effective 6/1/2011 BAC Local #1 WA decreased Journeyman Finisher rates by $3.00 per hour.  It is not being reflected yet in the prevailing wage.</text_data><comment_date>2011-08-04T00:00:00</comment_date></row><row _id="row-3ane~afxs.92qa" _uuid="00000000-0000-0000-8E82-34E358BD3DAF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ane~afxs.92qa"><intent_id>722699</intent_id><project_id>773221</project_id><text_data>(A) Water damage to health room.  (B) Cabinet, Wallpaper, Baseboard removal and structural drying.  District is taking care of repairs.</text_data><comment_date>2015-10-01T00:00:00</comment_date></row><row _id="row-bnvh.6nqw.bzqp" _uuid="00000000-0000-0000-633E-DB38FFA6B881" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bnvh.6nqw.bzqp"><intent_id>503141</intent_id><project_id>683873</project_id><text_data>General Laborer will be sweeping, cleaning tools, hand loading debris into a truck for proper disposal, using a hand shovel for minor excavation work.</text_data><comment_date>2012-03-12T00:00:00</comment_date></row><row _id="row-t5x2~4n6x_udb3" _uuid="00000000-0000-0000-C3FC-E129FE87B52C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t5x2~4n6x_udb3"><intent_id>650723</intent_id><project_id>737496</project_id><text_data>This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-09-22T00:00:00</comment_date></row><row _id="row-xn25.2tuj.i6re" _uuid="00000000-0000-0000-0AC9-41B25961145F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xn25.2tuj.i6re"><intent_id>513399</intent_id><project_id>687323</project_id><text_data>OTHER TRUCKS - WATER TANK TRUCK - OIL DISTRIBUTOR, WATER TANK TRUCK WILL SPRAY THE ROADWAY WITH WATER AND THE OIL DISTRIBUTOR WILL SPRAY THE ROAD WITH OIL/TACK</text_data><comment_date>2012-05-31T00:00:00</comment_date></row><row _id="row-5dq6-26nf~vvtv" _uuid="00000000-0000-0000-E490-CA8F588243FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5dq6-26nf~vvtv"><intent_id>701094</intent_id><project_id>756517</project_id><text_data>General Laborer install of pedestal paver system.  this is the classification we have been instructed to use with LNI.</text_data><comment_date>2015-06-16T00:00:00</comment_date></row><row _id="row-fqu8.65eq-ebuw" _uuid="00000000-0000-0000-693E-2215FF3DE0F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fqu8.65eq-ebuw"><intent_id>973667</intent_id><project_id>879353</project_id><text_data>000504-148-00</text_data><comment_date>2019-04-24T00:00:00</comment_date></row><row _id="row-fx4d_5awj~b84d" _uuid="00000000-0000-0000-6320-10D85E5AD24E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fx4d_5awj~b84d"><intent_id>759418</intent_id><project_id>790814</project_id><text_data>Installation of indoor copper telephone telecommunications cabling</text_data><comment_date>2016-05-05T00:00:00</comment_date></row><row _id="row-munu.ih74.qj47" _uuid="00000000-0000-0000-95D9-B54FEC1A7528" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-munu.ih74.qj47"><intent_id>1019484</intent_id><project_id>898533</project_id><text_data>1. Weatherize Home2. Single Family Dwelling3.One Level4. a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no l.no5.yes6.yes7.no8.no</text_data><comment_date>2019-11-04T00:00:00</comment_date></row><row _id="row-8n7x.j7fv-65ta" _uuid="00000000-0000-0000-BAA2-7079F5C27D8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8n7x.j7fv-65ta"><intent_id>1064626</intent_id><project_id>922103</project_id><text_data>303281</text_data><comment_date>2020-06-11T00:00:00</comment_date></row><row _id="row-e65i_twph-i74i" _uuid="00000000-0000-0000-8FDE-506ADDF48480" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e65i_twph-i74i"><intent_id>861850</intent_id><project_id>826938</project_id><text_data>Filed by James Hancock</text_data><comment_date>2017-09-11T00:00:00</comment_date></row><row _id="row-6nye.kf4r.4qsx" _uuid="00000000-0000-0000-EC79-F2438E951170" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6nye.kf4r.4qsx"><intent_id>597262</intent_id><project_id>721244</project_id><text_data>c/o CBREService Call 130731-0061</text_data><comment_date>2013-10-02T00:00:00</comment_date></row><row _id="row-tchp-v595.z344" _uuid="00000000-0000-0000-C85B-5D7DD786502E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tchp-v595.z344"><intent_id>915586</intent_id><project_id>854991</project_id><text_data>Job #115303-001</text_data><comment_date>2018-07-03T00:00:00</comment_date></row><row _id="row-qrsk~r722.6q4a" _uuid="00000000-0000-0000-4F50-A906D1B8E5D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qrsk~r722.6q4a"><intent_id>645061</intent_id><project_id>740762</project_id><text_data>Remove ceramic wall sculpture from eye level with hand tools (hammer, chisel, drill) and pack into boxes. Deliver to storage location.</text_data><comment_date>2014-08-01T00:00:00</comment_date></row><row _id="row-jncs_xcwy-gdwy" _uuid="00000000-0000-0000-2308-DE8A445445A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jncs_xcwy-gdwy"><intent_id>667699</intent_id><project_id>740422</project_id><text_data>Exterior re-clad &amp; Interior renovation of kitchens and bathrooms in 2 level apt. bldg.; no commercial, retail or public use in bldg.; no rehab, transitional housing, treatment, communial dining , forms or counseling in bldg., each unit has own kitchen &amp; bath and is rented separately for permanent residence, no manager&amp;#39;s office on site.  - Iris Window Coverings will be installing window coverings (verticals)</text_data><comment_date>2014-11-28T00:00:00</comment_date></row><row _id="row-8jgf_d4iv-wytf" _uuid="00000000-0000-0000-957A-DEFFFDA515B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8jgf_d4iv-wytf"><intent_id>500797</intent_id><project_id>679344</project_id><text_data>ECI Job # 8514</text_data><comment_date>2012-02-16T00:00:00</comment_date></row><row _id="row-er6r.5i25~fk99" _uuid="00000000-0000-0000-2709-238ED7C13D73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-er6r.5i25~fk99"><intent_id>1469514</intent_id><project_id>1131813</project_id><text_data>Asphalt NW Job # 24-191PW2</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-gi6s-veb2-a85w" _uuid="00000000-0000-0000-DA6C-73AE51E0FFC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gi6s-veb2-a85w"><intent_id>1492459</intent_id><project_id>1159752</project_id><text_data>1.Weatherization 2. single family 3. 1 4. Aa0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2024-12-05T00:00:00</comment_date></row><row _id="row-q8pa~8h4p_tdqr" _uuid="00000000-0000-0000-EEDF-E46A4BE60022" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8pa~8h4p_tdqr"><intent_id>1488511</intent_id><project_id>1152537</project_id><text_data>All casework and related supplies will be ordered, manufactured, and shipped from the state of Idaho. We have listed five employees assigned to this project, although we do not plan to utilize them directly, as we intend to hire a subcontractor to complete the work. However, these employees are included as a contingency in case we need to perform work on the project ourselves.</text_data><comment_date>2024-11-26T00:00:00</comment_date></row><row _id="row-2bmb_2hg8.bmy4" _uuid="00000000-0000-0000-6786-411631322BD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2bmb_2hg8.bmy4"><intent_id>1497869</intent_id><project_id>1163180</project_id><text_data>Job #50957-1</text_data><comment_date>2024-12-31T00:00:00</comment_date></row><row _id="row-c89b.229n.ahtd" _uuid="00000000-0000-0000-C370-B2DD524C44DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c89b.229n.ahtd"><intent_id>1497548</intent_id><project_id>1162957</project_id><text_data>JCI Project ID 5N59-0250 Electrical Subcontractor EC Company UBI 601107330</text_data><comment_date>2024-12-30T00:00:00</comment_date></row><row _id="row-pa3c-vvey_fr6t" _uuid="00000000-0000-0000-7ECB-73D9BF5A4D22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pa3c-vvey_fr6t"><intent_id>809467</intent_id><project_id>797994</project_id><text_data>From: Sylvia Gallegos [mailto:SylviaGallegos@krazan.com] Sent: Tuesday, January 10, 2017 9:52 AMTo: Capek, Laurie (LNI) &amp;lt;cape235@LNI.WA.GOV&amp;gt;Subject: FW: Correction Notice for TSA Military Road1. What is the specific purpose of this awarding agency�s public works project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc. S. 200th st/Military Road intersection improvements2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)] No3. Does this specific project entail the remodeling or new construction of a facility? No4. If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc. No5. What specific tasks will your employees perform? Soil compaction 6. What, if any, tools will your employees use in the performance of those tasks? We used a nuclear densometer with associated hand tools7. If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? NA8. Are you going to be hiring any subcontractors for this project? No</text_data><comment_date>2017-01-11T00:00:00</comment_date></row><row _id="row-w6ka~q3c5.mmjm" _uuid="00000000-0000-0000-4C58-7D8305BE9644" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w6ka~q3c5.mmjm"><intent_id>1127864</intent_id><project_id>953784</project_id><text_data>CVSE7887-0005268</text_data><comment_date>2021-03-10T00:00:00</comment_date></row><row _id="row-86my~zzi7~ncwh" _uuid="00000000-0000-0000-79BD-EA916BC9ED14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-86my~zzi7~ncwh"><intent_id>756065</intent_id><project_id>784756</project_id><text_data>Adding cat 6 structured cabling to enhance school districts computer network infrastructure by adding wireless access points to be used with laptops and other electronic media forms</text_data><comment_date>2016-04-13T00:00:00</comment_date></row><row _id="row-rwx7-6n7d.h5qc" _uuid="00000000-0000-0000-2FCA-62CB8C1496AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rwx7-6n7d.h5qc"><intent_id>516053</intent_id><project_id>689267</project_id><text_data>Kong Chow - HIF#12149898</text_data><comment_date>2012-06-11T00:00:00</comment_date></row><row _id="row-9w4q-q6ft.tjvk" _uuid="00000000-0000-0000-0E07-69EE28984A21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9w4q-q6ft.tjvk"><intent_id>945835</intent_id><project_id>864738</project_id><text_data>1 drain cleaning 2 single 3 n/a 4a no b no c yes d no e no f no g no h no i no j no k no 5 yes 6 yes 7 no 8 no</text_data><comment_date>2018-11-14T00:00:00</comment_date></row><row _id="row-v4vt_ghcp.uu5b" _uuid="00000000-0000-0000-6BBE-6AB84F1698E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v4vt_ghcp.uu5b"><intent_id>327118</intent_id><project_id>642314</project_id><text_data>3684 Smugglers Cove  Rd. Freeland, WA  98249</text_data><comment_date>2011-05-06T00:00:00</comment_date></row><row _id="row-b4wm-yggh.9jka" _uuid="00000000-0000-0000-5E51-C68FA730EDA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b4wm-yggh.9jka"><intent_id>692234</intent_id><project_id>761292</project_id><text_data>Road call to repair hot water heater on RV. Diagnosis has not been made yet on the job.</text_data><comment_date>2015-05-07T00:00:00</comment_date></row><row _id="row-dcgx.sctp-n6y8" _uuid="00000000-0000-0000-F99F-257109E8D26C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dcgx.sctp-n6y8"><intent_id>589304</intent_id><project_id>718353</project_id><text_data>PLEASE DISREGARD ABOVE NOTES PER PHONE CALL ON FRIDAY OCTOBER 27TH</text_data><comment_date>2013-09-30T00:00:00</comment_date></row><row _id="row-z6vv~ybep.4vxu" _uuid="00000000-0000-0000-3541-CEABE3596108" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z6vv~ybep.4vxu"><intent_id>842412</intent_id><project_id>799211</project_id><text_data>PELLCO HIRED US</text_data><comment_date>2017-06-21T00:00:00</comment_date></row><row _id="row-jgqp_u6gp.pbak" _uuid="00000000-0000-0000-6D2A-EFD8AF7B172F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgqp_u6gp.pbak"><intent_id>515300</intent_id><project_id>678491</project_id><text_data>Filed by: Brad Picken</text_data><comment_date>2012-06-06T00:00:00</comment_date></row><row _id="row-skxb-67xp_qfhq" _uuid="00000000-0000-0000-877E-6FFA2CF25DC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-skxb-67xp_qfhq"><intent_id>967365</intent_id><project_id>876571</project_id><text_data>1. Install furnaces in affordable housing apartments2. Apartments3. 2 stories4.  Affordable housing residencesa.  nob.  noc.  yesd.  noe.  nof.  nog.  noh.  noi.  noj.  nok.  nol.  n/a5.  yes6.  yes7.  no8.  no</text_data><comment_date>2019-03-25T00:00:00</comment_date></row><row _id="row-2nfn.4yk9_s2wq" _uuid="00000000-0000-0000-F64B-B125EC08162D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2nfn.4yk9_s2wq"><intent_id>1254874</intent_id><project_id>1024951</project_id><text_data>0608-04 Telephone and/or telephonic equipment - Prewire by contractor: Installation, service, and/or repair. Installation of Indoor Telecommunications Cabling - Voice &amp; Data Transmissions. Ellensburg, WA.</text_data><comment_date>2022-08-03T00:00:00</comment_date></row><row _id="row-8j7f_qtpk~itja" _uuid="00000000-0000-0000-7482-3D2179415CDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8j7f_qtpk~itja"><intent_id>774171</intent_id><project_id>796745</project_id><text_data>PPC 16420</text_data><comment_date>2016-07-13T00:00:00</comment_date></row><row _id="row-7jd2~nnwu_ew8d" _uuid="00000000-0000-0000-96B4-1EA7F9688965" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7jd2~nnwu_ew8d"><intent_id>839642</intent_id><project_id>822377</project_id><text_data>GENERAL LABORERS USE HAND TOOLS SUCH AS SHOVELS AND RAKE AND DO MANUAL TASKS SUCH AS INSTALLING SILT FENCE AND HAY. OTHER TRUCKS INCLUDE LOWBOY AND/OR WATERTRUCKS.</text_data><comment_date>2017-06-09T00:00:00</comment_date></row><row _id="row-47d8-94vz.hjyx" _uuid="00000000-0000-0000-C6C3-2845C6129C5B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-47d8-94vz.hjyx"><intent_id>605941</intent_id><project_id>724510</project_id><text_data>Venting Fans11000 1st Ave SW, Seattle, WA 981461. Insulation2. Apartment3. 24. Dwellings A. No B. No C. No D. No E. No F. No G. No H. No I. No J. No K. No 5. Yes 6. Yes7. Yes8. No</text_data><comment_date>2013-11-22T00:00:00</comment_date></row><row _id="row-djjq.hg5m-7qp3" _uuid="00000000-0000-0000-4BE7-AC1C76E3A136" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-djjq.hg5m-7qp3"><intent_id>1055951</intent_id><project_id>903791</project_id><text_data>D06062 / SD4979</text_data><comment_date>2020-05-05T00:00:00</comment_date></row><row _id="row-hv9a.xm65.vppk" _uuid="00000000-0000-0000-650D-8BD79072BE1B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hv9a.xm65.vppk"><intent_id>958672</intent_id><project_id>844149</project_id><text_data>Planting shovels, mulching Blower truck, raking, Irrigation Installation, hand shovels, small tools,   Paver installation small hand tools.Mini Excavator</text_data><comment_date>2019-02-04T00:00:00</comment_date></row><row _id="row-c87k_5q27_6gax" _uuid="00000000-0000-0000-22F3-F15AB94DD051" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c87k_5q27_6gax"><intent_id>509156</intent_id><project_id>678472</project_id><text_data>Request to add the following verbiage per Glenna Williams: &amp;quot;Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.&amp;quot;</text_data><comment_date>2012-05-25T00:00:00</comment_date></row><row _id="row-z7vq~vusp-8k2r" _uuid="00000000-0000-0000-F373-D79AAE85474D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7vq~vusp-8k2r"><intent_id>644133</intent_id><project_id>738546</project_id><text_data>Taylor Transport Inc. 401K Pension plan is 100% immediately vested and paid weekly</text_data><comment_date>2014-07-29T00:00:00</comment_date></row><row _id="row-tf4r_a5h4~zeug" _uuid="00000000-0000-0000-030D-7CB3E5A9DD23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tf4r_a5h4~zeug"><intent_id>1269807</intent_id><project_id>1032794</project_id><text_data>INV # 89080202 SR # 52940226</text_data><comment_date>2022-09-27T00:00:00</comment_date></row><row _id="row-tpmc.jd63-aja7" _uuid="00000000-0000-0000-BD05-B525C89D8099" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tpmc.jd63-aja7"><intent_id>1109403</intent_id><project_id>943279</project_id><text_data>WORK FOR KEVIN HUSEMANN @ 175TH PL</text_data><comment_date>2020-12-11T00:00:00</comment_date></row><row _id="row-ritv.6iuf~xxx7" _uuid="00000000-0000-0000-CD56-ECFB87900B2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ritv.6iuf~xxx7"><intent_id>779328</intent_id><project_id>774791</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project? Update HVAC control system for energy saving. 2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No. 3. Does this project entail the remodeling or new construction of a facility? Yes, but not performed by Siemens employees. 4. If your firm is working upon a type of building system, what type of system is involved? HVAC control system. 5. What specific tasks did your employees perform? Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drill or wrenches. 6. What, if any, tools did your employees use in the performance of those tasks? Laptop computer.7. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No-none.8. Are you going to be hiring any subcontractors for this project? Yes</text_data><comment_date>2016-08-02T00:00:00</comment_date></row><row _id="row-7fkq_cn5i~wxi7" _uuid="00000000-0000-0000-AC59-DFDC18803F6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7fkq_cn5i~wxi7"><intent_id>453470</intent_id><project_id>470943</project_id><text_data>Pease Piping, Inc. is a separate entity from Pease &amp; Sons, therefore the hiring contractor in this case would be Pease Piping as this intent is for Pease &amp; Sons, Inc.  Thank you.</text_data><comment_date>2011-05-09T00:00:00</comment_date></row><row _id="row-i2xg_d8j7_q29c" _uuid="00000000-0000-0000-1078-C4373C714FAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2xg_d8j7_q29c"><intent_id>541578</intent_id><project_id>656289</project_id><text_data>BREAKDOWN AS FOLLOWS:HEALTH &amp; SECURITY $7.55PENSION $7.65APPRENTICE/TRAINING .70</text_data><comment_date>2012-10-25T00:00:00</comment_date></row><row _id="row-ug89~qx8u~8hhw" _uuid="00000000-0000-0000-3DD6-AF41BC7AE3E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ug89~qx8u~8hhw"><intent_id>931213</intent_id><project_id>857281</project_id><text_data>4180351 - 531 S Donovan St Phase 2</text_data><comment_date>2018-09-07T00:00:00</comment_date></row><row _id="row-8ddd-5axi-8d54" _uuid="00000000-0000-0000-EE1F-1309E6B372EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ddd-5axi-8d54"><intent_id>942006</intent_id><project_id>864954</project_id><text_data>Filing Per MJW</text_data><comment_date>2018-10-25T00:00:00</comment_date></row><row _id="row-uwqd.m4fh_hmkz" _uuid="00000000-0000-0000-75FB-0FE53E977921" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwqd.m4fh_hmkz"><intent_id>917011</intent_id><project_id>855562</project_id><text_data>OTHER TRUCKS = WATER TRUCK AND OIL DISTRIBUTOR</text_data><comment_date>2018-07-10T00:00:00</comment_date></row><row _id="row-biqt~9ww2-ba97" _uuid="00000000-0000-0000-7581-04CD2F640ABF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-biqt~9ww2-ba97"><intent_id>685359</intent_id><project_id>758308</project_id><text_data>301939</text_data><comment_date>2015-03-24T00:00:00</comment_date></row><row _id="row-7p5i~5gxi-a3qg" _uuid="00000000-0000-0000-4BFE-4468684C678B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7p5i~5gxi-a3qg"><intent_id>688958</intent_id><project_id>759924</project_id><text_data>Job # 20136-002</text_data><comment_date>2015-04-14T00:00:00</comment_date></row><row _id="row-nvr9-3p3c~3fur" _uuid="00000000-0000-0000-58A0-3C0D27BBE616" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nvr9-3p3c~3fur"><intent_id>556429</intent_id><project_id>701551</project_id><text_data>Owner Nic Fistolera will be preforming the painting and part of the carpentry work.</text_data><comment_date>2013-02-15T00:00:00</comment_date></row><row _id="row-8xg3.5y82_dwr4" _uuid="00000000-0000-0000-B9AA-7E804D860504" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8xg3.5y82_dwr4"><intent_id>729734</intent_id><project_id>774722</project_id><text_data>Filed by Tom Courtney</text_data><comment_date>2015-11-03T00:00:00</comment_date></row><row _id="row-ub9d.c6cg~jkuf" _uuid="00000000-0000-0000-34A1-257F9CC4544F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ub9d.c6cg~jkuf"><intent_id>1017890</intent_id><project_id>897890</project_id><text_data>88248 Headstart Range</text_data><comment_date>2019-10-25T00:00:00</comment_date></row><row _id="row-sz7d.cywu-ex6v" _uuid="00000000-0000-0000-08A4-B9824FBD1A29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sz7d.cywu-ex6v"><intent_id>958357</intent_id><project_id>859139</project_id><text_data>Filed by Kenneth Sheldon</text_data><comment_date>2019-02-01T00:00:00</comment_date></row><row _id="row-2fe2_5q4g~29wf" _uuid="00000000-0000-0000-5833-143837722E22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2fe2_5q4g~29wf"><intent_id>780798</intent_id><project_id>788011</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2016-08-26T00:00:00</comment_date></row><row _id="row-n2bg_uvzx-wcyr" _uuid="00000000-0000-0000-C7ED-CE0334AAE34D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2bg_uvzx-wcyr"><intent_id>952957</intent_id><project_id>850026</project_id><text_data>Filed by Lance Stafford - He did 100% of work</text_data><comment_date>2019-01-02T00:00:00</comment_date></row><row _id="row-e5sw_x75v-8wv7" _uuid="00000000-0000-0000-17FB-961B3D8A18DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e5sw_x75v-8wv7"><intent_id>543432</intent_id><project_id>698933</project_id><text_data>Payment has been sent to reinstate license, check # 6337 for the amount of $113.40. The work we will be doing is assembly of out side furniture and then anchoring them to concrete. the tools we will be using is a power generater, hammer drill, shop vac and concrete anchors.</text_data><comment_date>2012-11-16T00:00:00</comment_date></row><row _id="row-z4kd_zttc-2hja" _uuid="00000000-0000-0000-84EC-84E88818FE44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z4kd_zttc-2hja"><intent_id>901525</intent_id><project_id>849524</project_id><text_data>10012649 - provide power  Coax</text_data><comment_date>2018-04-30T00:00:00</comment_date></row><row _id="row-5d44.9u48-pkfc" _uuid="00000000-0000-0000-23D4-7AB007A9ECE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5d44.9u48-pkfc"><intent_id>497967</intent_id><project_id>681792</project_id><text_data>PAMELA LYTLE101 OLEQUA CTVADAR WA 98593</text_data><comment_date>2012-01-25T00:00:00</comment_date></row><row _id="row-9qn8.gitp.tyth" _uuid="00000000-0000-0000-4E47-20AC54031423" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9qn8.gitp.tyth"><intent_id>744678</intent_id><project_id>784162</project_id><text_data>Chains, hoists, shackles, and rollers were used to move a piece of very heavy glass.  Robbins was not involved in the installation of the glass, only in moving it.  I reviewed the work on this with Ramona and she told me to use the labor category.</text_data><comment_date>2016-02-03T00:00:00</comment_date></row><row _id="row-dvg3.kxrq~tpg3" _uuid="00000000-0000-0000-0046-2BE41A2D5D3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dvg3.kxrq~tpg3"><intent_id>605412</intent_id><project_id>724296</project_id><text_data>Indoor work only.  Technician is moving the telephone system to a different room, reprogramming the equipment.  No wiring work is being completed by technician.</text_data><comment_date>2013-11-26T00:00:00</comment_date></row><row _id="row-ihfw-cni6~aera" _uuid="00000000-0000-0000-462C-D5CD09F021F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihfw-cni6~aera"><intent_id>1015480</intent_id><project_id>896226</project_id><text_data>Rebuild ?</text_data><comment_date>2019-10-15T00:00:00</comment_date></row><row _id="row-vnpf_a3jj~ktfs" _uuid="00000000-0000-0000-7F65-061803523822" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vnpf_a3jj~ktfs"><intent_id>613085</intent_id><project_id>726009</project_id><text_data>Form filed by: Gary Liles</text_data><comment_date>2014-01-21T00:00:00</comment_date></row><row _id="row-jvtu_rscf-z63v" _uuid="00000000-0000-0000-1F4A-06C23473A44C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jvtu_rscf-z63v"><intent_id>812738</intent_id><project_id>811974</project_id><text_data>1)We were contracted to repair the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-01-25T00:00:00</comment_date></row><row _id="row-v535-f39z_qu3m" _uuid="00000000-0000-0000-062D-43296EFFA0B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v535-f39z_qu3m"><intent_id>505446</intent_id><project_id>684903</project_id><text_data>#1 - Apartment#2 - 2 Stories#3 - A) yes  B) no  C) no  D) no  E) no  F) no  G) no#4 - Yes#5 - Yes#6 - No#7 - No</text_data><comment_date>2012-03-29T00:00:00</comment_date></row><row _id="row-e4i6~a4da_qva4" _uuid="00000000-0000-0000-83F0-2BA6FC2B89D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e4i6~a4da_qva4"><intent_id>658720</intent_id><project_id>745961</project_id><text_data>This contract is for Irrigation Work at Goddard Park in the city of Bellevue. This project to consist of replacement of irrigation system components including POC, mainline, lateral lines, valves, low voltage wiring and sprinkler heads for this City of Bellevue site.This service is set to start for daily work on October 27, 2014 and expected to be completed by end of month November 2014.</text_data><comment_date>2014-10-06T00:00:00</comment_date></row><row _id="row-xh5w~wgev.2wem" _uuid="00000000-0000-0000-98CC-A602C907D730" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xh5w~wgev.2wem"><intent_id>1184393</intent_id><project_id>941279</project_id><text_data>The sewers are located underground in streets and yards.</text_data><comment_date>2021-11-08T00:00:00</comment_date></row><row _id="row-cjkp_btfp_bid5" _uuid="00000000-0000-0000-3E15-F4138B864D80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjkp_btfp_bid5"><intent_id>1043177</intent_id><project_id>911193</project_id><text_data>JIM EDWARDS 8 HOURS</text_data><comment_date>2020-03-05T00:00:00</comment_date></row><row _id="row-uiq6-wjrt-adcc" _uuid="00000000-0000-0000-2525-47830AA9D1BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uiq6-wjrt-adcc"><intent_id>1068368</intent_id><project_id>918152</project_id><text_data>LONG Job # 5050.200240</text_data><comment_date>2020-06-26T00:00:00</comment_date></row><row _id="row-fhvg.q4ss~wdtw" _uuid="00000000-0000-0000-9ADC-01A9D0AA4D87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fhvg.q4ss~wdtw"><intent_id>1168945</intent_id><project_id>975024</project_id><text_data>NW Fairhaven Dr., Oak Harbor, WA 98277       1. Air seal, attic blow, crawl, mechanical ventilation   2. Single family     3. 1     4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No   5. Yes     6. Yes     7. No     8. No</text_data><comment_date>2021-08-13T00:00:00</comment_date></row><row _id="row-gvrq.eb4c.zyvt" _uuid="00000000-0000-0000-9833-3EFC50D32707" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gvrq.eb4c.zyvt"><intent_id>567412</intent_id><project_id>709411</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.Filed by Dan Huff</text_data><comment_date>2013-05-01T00:00:00</comment_date></row><row _id="row-23wg_wwhx_w4y2" _uuid="00000000-0000-0000-78BF-5D29C7BCFF58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-23wg_wwhx_w4y2"><intent_id>971168</intent_id><project_id>878251</project_id><text_data>1. Repair furnace. 2. Single family dwelling. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2019-04-11T00:00:00</comment_date></row><row _id="row-533u~ecab_j8ar" _uuid="00000000-0000-0000-6852-241944608356" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-533u~ecab_j8ar"><intent_id>1078119</intent_id><project_id>928091</project_id><text_data>3. Planting maintenanceWithin the defined area, remove all above- and below-ground vegetation within a 4� diameter circle around and 8� above native plantings, living or dead. Maintain all live native trees 10� and under. Take a census of live and dead plantings and report number to Natural Resources Staff, identify canopy trees versus shrubs. Apply new mulch of 3� depth native leaf litter or arborist chips to entire circle. When on-site leaf litter is insufficient, the City may provide arborist chips depending on site accessibility. Remove any flagging tape or twine from main stem. Reflag any plants without flagging with 6� length of 1� wide fluorescent flagging tape attached to a lateral branch.</text_data><comment_date>2020-08-05T00:00:00</comment_date></row><row _id="row-kpeb~kjpb-hrxy" _uuid="00000000-0000-0000-28DC-64E47CB39878" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kpeb~kjpb-hrxy"><intent_id>1156817</intent_id><project_id>968868</project_id><text_data>I will be cleaning the duct work and vent covers only, no actual sheet metal work will be done. I will be removing vents, cleaning the ducting and vent covers and putting them back. I am not required to have a contractors license for this project since we are only providing a cleaning service.</text_data><comment_date>2021-07-13T00:00:00</comment_date></row><row _id="row-kb6w~ibst_mxsr" _uuid="00000000-0000-0000-D042-86F0841D0DA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kb6w~ibst_mxsr"><intent_id>712989</intent_id><project_id>764467</project_id><text_data>Duct and grill.</text_data><comment_date>2015-08-07T00:00:00</comment_date></row><row _id="row-f4i9_pxv2-cdma" _uuid="00000000-0000-0000-40EF-325B03C8C44F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f4i9_pxv2-cdma"><intent_id>936647</intent_id><project_id>860872</project_id><text_data>Roglins  job # 18-80-135TRUCKSLowboy delivers asphalt rotomill to job siteSweepers driven to job site</text_data><comment_date>2018-10-01T00:00:00</comment_date></row><row _id="row-4s5h-vwjx.i6p8" _uuid="00000000-0000-0000-B936-3F93283295D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4s5h-vwjx.i6p8"><intent_id>1228813</intent_id><project_id>1004123</project_id><comment_date>2022-04-26T00:00:00</comment_date></row><row _id="row-iqy7_xexh_ewqx" _uuid="00000000-0000-0000-3FE8-FCEA6201BDFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iqy7_xexh_ewqx"><intent_id>1015262</intent_id><project_id>896142</project_id><text_data>Insulate, air seal, install ductless heat pump. 2. single family dwelling 3. Two stories 4. a) no b) no c) yes d) no e) no f) no g) no h) no i) no j) no k) no l) no 5.  the residential home has one kitchen 6. yes - the house has a bathroom 7. no 8. no</text_data><comment_date>2019-10-14T00:00:00</comment_date></row><row _id="row-r8qj~qsaj.uyd8" _uuid="00000000-0000-0000-D4CE-8C7E01CF2955" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r8qj~qsaj.uyd8"><intent_id>1200169</intent_id><project_id>992311</project_id><text_data>No questions</text_data><comment_date>2021-12-17T00:00:00</comment_date></row><row _id="row-xe38_ucs8_bmt8" _uuid="00000000-0000-0000-BFF0-0746ACF9E767" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xe38_ucs8_bmt8"><intent_id>1035935</intent_id><project_id>907001</project_id><text_data>Elect tech(06)Inside BuildingFix and replace damage workstationsinstall telephone and data cabling to cubicles</text_data><comment_date>2020-02-04T00:00:00</comment_date></row><row _id="row-yy2i~jkhd.vvcj" _uuid="00000000-0000-0000-18B5-E0426F758E24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yy2i~jkhd.vvcj"><intent_id>627966</intent_id><project_id>734258</project_id><text_data>Upgrade water heater, upgrade insulation, Upgrade exterior door</text_data><comment_date>2014-05-05T00:00:00</comment_date></row><row _id="row-8ykw_wrif.xzxn" _uuid="00000000-0000-0000-2D3B-570F78FE65E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ykw_wrif.xzxn"><intent_id>538516</intent_id><project_id>689264</project_id><text_data>2001 International Tractor and 48f Flatbed Trailer - Delivered Redi Rock Concrete Blocks</text_data><comment_date>2012-10-12T00:00:00</comment_date></row><row _id="row-9rx6.hw96-4thm" _uuid="00000000-0000-0000-D9AF-13264AA300C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9rx6.hw96-4thm"><intent_id>829627</intent_id><project_id>819368</project_id><text_data>We performs trenchless rehab of sewer and storm drain lines by installing a liner inside of existing conduit via existing manholes.  We use a jet truck, closed circuit televising truck with remote camera, boiler trucks, bypass pumps and hoses, and liner installation devices.</text_data><comment_date>2017-05-04T00:00:00</comment_date></row><row _id="row-a5dd-aay2-2b9e" _uuid="00000000-0000-0000-5F22-254854571939" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5dd-aay2-2b9e"><intent_id>676697</intent_id><project_id>754575</project_id><text_data>Blythe job #S-303</text_data><comment_date>2015-01-27T00:00:00</comment_date></row><row _id="row-tfcs_tgpi~e28c" _uuid="00000000-0000-0000-00FB-4468DE21034A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tfcs_tgpi~e28c"><intent_id>610816</intent_id><project_id>726778</project_id><text_data>Filed by AJ Smith.Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2014-01-06T00:00:00</comment_date></row><row _id="row-3huq-7hb3-e22i" _uuid="00000000-0000-0000-5BC4-770DC0CB13E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3huq-7hb3-e22i"><intent_id>1205440</intent_id><project_id>990726</project_id><text_data>FIRE ANNUAL</text_data><comment_date>2022-01-18T00:00:00</comment_date></row><row _id="row-hfvt.af26~5ihu" _uuid="00000000-0000-0000-7D57-493D3C1C4997" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hfvt.af26~5ihu"><intent_id>1417731</intent_id><project_id>1092007</project_id><text_data>TCC CILE (NSS) 1199-01</text_data><comment_date>2024-04-09T00:00:00</comment_date></row><row _id="row-d3xk~pp6s.ya3z" _uuid="00000000-0000-0000-A6B8-577597DE3474" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d3xk~pp6s.ya3z"><intent_id>839111</intent_id><project_id>823812</project_id><text_data>SN: BJ113T0004 &amp; BJ117T0010 Full Battery Replacements</text_data><comment_date>2017-06-07T00:00:00</comment_date></row><row _id="row-xmvh.metm.z8i4" _uuid="00000000-0000-0000-4CC4-CEABFA265BA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xmvh.metm.z8i4"><intent_id>1262215</intent_id><project_id>1028611</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-09-16T00:00:00</comment_date></row><row _id="row-javz.v4wx~r3d6" _uuid="00000000-0000-0000-D9C3-F09F424A6F17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-javz.v4wx~r3d6"><intent_id>878830</intent_id><project_id>839232</project_id><text_data>MMFS Service Call 170824-0049</text_data><comment_date>2017-12-12T00:00:00</comment_date></row><row _id="row-d5tg_mwhb~h626" _uuid="00000000-0000-0000-84C5-36BDFCD9A3AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d5tg_mwhb~h626"><intent_id>1274366</intent_id><project_id>1035135</project_id><text_data>The material being spread is not concrete, Shotcrete or Gunite. The material is not under high pressure, it is not a water blaster or a vacuum blaster and we are not performing any green cutting with high pressure water &amp; high pressure air.Our duties for a project are to bring playground wood chip material in our truck to a facility where everything is marked and ready for Swanson employee(s) to take a hose and blow the playground chips on existing playgrounds where they tell us. Once the playground chips are spread out on the playground surface we use a blower similar to a leaf blower to clean up the area around the playground surface.</text_data><comment_date>2022-10-12T00:00:00</comment_date></row><row _id="row-fkbr_mxfu_i957" _uuid="00000000-0000-0000-4DAF-A915B524B76D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fkbr_mxfu_i957"><intent_id>1191781</intent_id><project_id>987172</project_id><text_data>1.Heat Pump Installation 2.SFD 3.One 4.a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No l)No 5.Yes 6.Yes 7.No 8.No</text_data><comment_date>2021-11-08T00:00:00</comment_date></row><row _id="row-ge6m~uv4x~7m8k" _uuid="00000000-0000-0000-FA48-A126AD28BAAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ge6m~uv4x~7m8k"><intent_id>1005690</intent_id><project_id>866198</project_id><text_data>Modernize and Add Irrigation and Landscape updates to k-12 school in bridgeport</text_data><comment_date>2019-09-09T00:00:00</comment_date></row><row _id="row-enc8.z6j2.fwrd" _uuid="00000000-0000-0000-073C-32167096A7FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-enc8.z6j2.fwrd"><intent_id>941538</intent_id><project_id>864754</project_id><text_data>Filed by Kathleen Barefoot-SolesProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trade occupations.</text_data><comment_date>2018-10-23T00:00:00</comment_date></row><row _id="row-632v_kbwt~8ucy" _uuid="00000000-0000-0000-55EA-6C7DBDFBFA18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-632v_kbwt~8ucy"><intent_id>659136</intent_id><project_id>737521</project_id><text_data>State of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form-Whatcom County Courthouse Courtroom Remodel Prevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.)What is the specific purpose of this awarding agency�s public works project?Remodel existing building, with upgrade to the HVAC system, VAV box and heat pumps.2.)Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.	3.)Does this project entail the remodeling or new construction of a facility?Yes, but not performed by Siemens Employees.  4.)If your firm is working upon a type of building system, what type of system is involved? HVAC/Refrigeration control system.  5.)What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.  6.)What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.)If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.)Are you going to be hiring any subcontractors for this project?Yes.</text_data><comment_date>2014-10-08T00:00:00</comment_date></row><row _id="row-bw5g_dcqf_fh9k" _uuid="00000000-0000-0000-D001-16AD5224DEC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bw5g_dcqf_fh9k"><intent_id>649255</intent_id><project_id>733562</project_id><text_data>owner/operator hauled asphalt grindings in his dumptruck.</text_data><comment_date>2014-08-22T00:00:00</comment_date></row><row _id="row-if3g-7mv9_mrfm" _uuid="00000000-0000-0000-9879-AAD9F5A2844C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-if3g-7mv9_mrfm"><intent_id>827681</intent_id><project_id>811360</project_id><text_data>Filed by Marlene Carlin</text_data><comment_date>2017-04-19T00:00:00</comment_date></row><row _id="row-t87u.f4px~s57c" _uuid="00000000-0000-0000-1D59-E30E67C062D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t87u.f4px~s57c"><intent_id>697268</intent_id><project_id>763443</project_id><text_data>Intents and affidavits for H and H Heating and Air:7616 N. Standard, Spokane, WA $4223.002611 E. Marshall, Spokane, WA $5250.21Total for this listing: $9,473.21</text_data><comment_date>2015-05-29T00:00:00</comment_date></row><row _id="row-hreu.6myj-qd4u" _uuid="00000000-0000-0000-8939-0AEC3F5A947C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hreu.6myj-qd4u"><intent_id>1019030</intent_id><project_id>887643</project_id><text_data>Hi Todd,Other truck is a Box TruckAngelo PiazzaController845-512-6000 XT 6001apiazza@hudsontech.comwww.hudsontech.com</text_data><comment_date>2019-10-31T00:00:00</comment_date></row><row _id="row-pdb6.uct9-af3c" _uuid="00000000-0000-0000-0870-269CE0A049A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pdb6.uct9-af3c"><intent_id>1112821</intent_id><project_id>945230</project_id><text_data>WO #'s 401617, 402389, 402391 &amp; 402394</text_data><comment_date>2021-01-04T00:00:00</comment_date></row><row _id="row-cj3q~dua8_q2dx" _uuid="00000000-0000-0000-E163-417660FE6868" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cj3q~dua8_q2dx"><intent_id>800590</intent_id><project_id>806870</project_id><text_data>Maria Flores200 W. Hawthorne #32Connell, WA 99326</text_data><comment_date>2016-11-09T00:00:00</comment_date></row><row _id="row-xpgw~j8id_2umu" _uuid="00000000-0000-0000-C0D4-AA6F859645FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xpgw~j8id_2umu"><intent_id>1132874</intent_id><project_id>955562</project_id><text_data>Clear and grub existing plants and debris. Plant trees, spread compost.</text_data><comment_date>2021-03-31T00:00:00</comment_date></row><row _id="row-a3sc_76zx.75yg" _uuid="00000000-0000-0000-2C21-6187D1E6F4A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a3sc_76zx.75yg"><intent_id>513404</intent_id><project_id>687831</project_id><text_data>Apply Sport Court Surfacing to 7 Tennis Courts</text_data><comment_date>2012-05-23T00:00:00</comment_date></row><row _id="row-inwg~hg33-kw4d" _uuid="00000000-0000-0000-D441-4054E6F601F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inwg~hg33-kw4d"><intent_id>517948</intent_id><project_id>690050</project_id><text_data>HIF# 13466499</text_data><comment_date>2012-06-20T00:00:00</comment_date></row><row _id="row-7q88-67c6.tdhb" _uuid="00000000-0000-0000-0701-2AB05882D2A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7q88-67c6.tdhb"><intent_id>803654</intent_id><project_id>807778</project_id><text_data>Job #109397-001</text_data><comment_date>2016-11-21T00:00:00</comment_date></row><row _id="row-bk5k~8ehj-xg39" _uuid="00000000-0000-0000-957A-BA829A8A9865" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bk5k~8ehj-xg39"><intent_id>723966</intent_id><project_id>773736</project_id><text_data>1)      Awarding Agency Contact : Anne Monks2)      Awarding Agency Contract Phone # : 206-787-5580</text_data><comment_date>2015-10-15T00:00:00</comment_date></row><row _id="row-jvm4~vqfg-gnem" _uuid="00000000-0000-0000-11DB-D619A0F18714" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jvm4~vqfg-gnem"><intent_id>1045158</intent_id><project_id>912284</project_id><text_data>Dig 8' deep soil for playground area, set form and pour concrete mowstrip around existing playground area using 17hp mini excavator and concrete hand tools.</text_data><comment_date>2020-03-12T00:00:00</comment_date></row><row _id="row-hh64-mqm7~vmse" _uuid="00000000-0000-0000-B51E-765B3FBA0091" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hh64-mqm7~vmse"><intent_id>737672</intent_id><project_id>777446</project_id><text_data>Filed by Tess Shugdinis</text_data><comment_date>2015-12-15T00:00:00</comment_date></row><row _id="row-ggch-dr7t~xjup" _uuid="00000000-0000-0000-F129-12D6918BB756" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ggch-dr7t~xjup"><intent_id>976069</intent_id><project_id>876663</project_id><text_data>301FNJ0265</text_data><comment_date>2019-05-06T00:00:00</comment_date></row><row _id="row-u4jn.e2d5-3nc9" _uuid="00000000-0000-0000-102A-C5D952EB37C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u4jn.e2d5-3nc9"><intent_id>1145825</intent_id><project_id>962985</project_id><text_data>Work performed by the Telecommunication Technicians is installing/repairing fiber optic telecommunications cabling for voice (telephone) and/or data (computer networking) indoors. POWERCOM JOB #959626</text_data><comment_date>2021-05-19T00:00:00</comment_date></row><row _id="row-pj9q~wgfe~ef6u" _uuid="00000000-0000-0000-3384-005213830283" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pj9q~wgfe~ef6u"><intent_id>897620</intent_id><project_id>847923</project_id><text_data>Motor Patrol grader to remove oily soilHaz Waste workers to clear area of all debris and backfill holes using rakes/shovels</text_data><comment_date>2018-04-10T00:00:00</comment_date></row><row _id="row-kub6.cbkz-smbg" _uuid="00000000-0000-0000-9909-E33730C31CCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kub6.cbkz-smbg"><intent_id>916935</intent_id><project_id>827057</project_id><text_data>INSTALLATION OF SHRUBS AND GROUNDCOVER, PLACING TOPSOIL AND BARKING FOR BEAUTIFICATION . IRRIGATION INSTALLATION. ALL WORK TO BE COMPLETE ALONG TALUS WAY AND SHANGRILA WAY.</text_data><comment_date>2018-07-10T00:00:00</comment_date></row><row _id="row-cd8u_syy5-mwvj" _uuid="00000000-0000-0000-0784-FE443DB38772" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cd8u_syy5-mwvj"><intent_id>1171318</intent_id><project_id>974876</project_id><text_data>Job 193</text_data><comment_date>2021-08-23T00:00:00</comment_date></row><row _id="row-cit8~sn44~qymx" _uuid="00000000-0000-0000-A5E9-DE25D689FD8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cit8~sn44~qymx"><intent_id>624929</intent_id><project_id>733005</project_id><text_data>Install fiber optics cable for IT.  Work performed indoors the Information Technology Building at WSU</text_data><comment_date>2014-04-17T00:00:00</comment_date></row><row _id="row-r2ti_usyr-gapd" _uuid="00000000-0000-0000-EF42-0994D78C5398" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r2ti_usyr-gapd"><intent_id>603305</intent_id><project_id>710356</project_id><text_data>HIRED BY PRIME</text_data><comment_date>2013-11-06T00:00:00</comment_date></row><row _id="row-t63s~cr3z~uhm2" _uuid="00000000-0000-0000-631B-8A8DD8B818E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t63s~cr3z~uhm2"><intent_id>1192511</intent_id><project_id>987591</project_id><text_data>#1 � Installation of Ductless Heat Pump System. #2 � Single Family #3 � 1 Story #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) No  (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (I) No (j) No (k) No (l) Other? #5 � Yes  #6 Yes #7 � No #8 - No</text_data><comment_date>2021-11-10T00:00:00</comment_date></row><row _id="row-yzb9-pb2g_dde8" _uuid="00000000-0000-0000-82E2-98A27008E646" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yzb9-pb2g_dde8"><intent_id>730577</intent_id><project_id>761738</project_id><text_data>Elect Tech(06)LAN(Local Area Network)Inside and outside Work</text_data><comment_date>2015-11-09T00:00:00</comment_date></row><row _id="row-huzn.5yae~r9ng" _uuid="00000000-0000-0000-AB12-762023E4D9FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-huzn.5yae~r9ng"><intent_id>803969</intent_id><project_id>807920</project_id><text_data>MMFS Job#76169164</text_data><comment_date>2016-11-22T00:00:00</comment_date></row><row _id="row-y6bp.wwey.kdhv" _uuid="00000000-0000-0000-017E-9D2E401F0A8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y6bp.wwey.kdhv"><intent_id>762492</intent_id><project_id>784094</project_id><text_data>Owner may perform work as a Glazier on this project.</text_data><comment_date>2016-05-17T00:00:00</comment_date></row><row _id="row-nn98_ync4-knwg" _uuid="00000000-0000-0000-7305-7478FAA13A9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nn98_ync4-knwg"><intent_id>654175</intent_id><project_id>744127</project_id><text_data>This intent is to replace existing intent #647268 as requested by Prime Contracto0r</text_data><comment_date>2014-09-12T00:00:00</comment_date></row><row _id="row-n6nc~pgxs-ti7m" _uuid="00000000-0000-0000-973A-6C4632A8F355" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n6nc~pgxs-ti7m"><intent_id>707352</intent_id><project_id>767366</project_id><text_data>Christensen Inc forces will be used strictly for clean-up and disposal, the demo/carpentry work will be subcontracted out.</text_data><comment_date>2015-07-22T00:00:00</comment_date></row><row _id="row-436k-gutn-fbev" _uuid="00000000-0000-0000-61AE-54A7D348FF39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-436k-gutn-fbev"><intent_id>1289862</intent_id><project_id>1044768</project_id><text_data>Invoice #562025    $472.78</text_data><comment_date>2022-12-14T00:00:00</comment_date></row><row _id="row-n63n.a2cg_65mw" _uuid="00000000-0000-0000-6BDA-335D47BB0990" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n63n.a2cg_65mw"><intent_id>1340498</intent_id><project_id>1043486</project_id><text_data>A. Provide &amp; install playground equipment and safety surfacingB. The subcontractor's duties for this project are to bring playground material in our truck to the facility where everything was marked and ready for our guy to dump the product on the playground where they were told to.</text_data><comment_date>2023-06-28T00:00:00</comment_date></row><row _id="row-ksmp~qf8b_6xg2" _uuid="00000000-0000-0000-0BB3-D3956C15A03A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ksmp~qf8b_6xg2"><intent_id>515884</intent_id><project_id>602487</project_id><text_data>TRUCK DRIVER OTHER USED FOR TRUCK MOUNTED PICKUP SWEEPER</text_data><comment_date>2012-06-08T00:00:00</comment_date></row><row _id="row-7i87_mzxr_58kz" _uuid="00000000-0000-0000-3252-D15D9627F236" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7i87_mzxr_58kz"><intent_id>958172</intent_id><project_id>872208</project_id><text_data>- Removal Done 10/26/17- Non Contract; re-file Intents &amp; Affidavits per job during period</text_data><comment_date>2019-01-31T00:00:00</comment_date></row><row _id="row-cgtf_sywg_jiej" _uuid="00000000-0000-0000-8235-F65979FA2898" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cgtf_sywg_jiej"><intent_id>1038462</intent_id><project_id>908459</project_id><text_data>Motor Pat Grader to vacuum contaminated liquidsHaz Waste worker to clear area of all debris using shovel/rake</text_data><comment_date>2020-02-14T00:00:00</comment_date></row><row _id="row-c4gk.bt9x~5t3z" _uuid="00000000-0000-0000-1872-D51D2F4959A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c4gk.bt9x~5t3z"><intent_id>616405</intent_id><project_id>729190</project_id><text_data>Pre- emergent spray work to beds</text_data><comment_date>2014-02-14T00:00:00</comment_date></row><row _id="row-9yjr~b3qh~st6u" _uuid="00000000-0000-0000-3F93-3FA0DAA34C3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9yjr~b3qh~st6u"><intent_id>1138320</intent_id><project_id>958320</project_id><text_data>Pablo Santillan, trade: Playground Park &amp; Equipment InstallersInstallation of playground structures.</text_data><comment_date>2021-05-05T00:00:00</comment_date></row><row _id="row-44y4_tfr9.6zt4" _uuid="00000000-0000-0000-7EB2-26F6A9E48FD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-44y4_tfr9.6zt4"><intent_id>912216</intent_id><project_id>853785</project_id><text_data>Filed by Shelley Anker(1) Prime Contractor: Tub Cove Inc.7801 Lake City Way NE Seattle, WA 98115 Contractor #TUBCOCI91BK UBI:602 940 234(2) University of Washington (Hiring entity... not a Contractor) Contact: Graham SherwoodHousing &amp; Food/Purchasing P 206-685-9074Job Site Addresses:Laurel Village4200 Mary Gates Way Seattle, WABlakely Village 4747 301h Ave NE Seattle, WA(3) Work Description: Removing old bath surround; prepping walls in make ready condition to prepare for installation of new Tub Cove laminate surround. Install Tub Cove laminate surround.{4) Type of Structure: Structure is a single family residential apartment.{5) Structure stories or levels: Stories or levels varies. The large percentage of the structures are 4-plex family housing. Some buildings are 2 story duplex housing.{6) Building Use: Buildings are used for student family housing.(7) Answer &amp;quot;yes&amp;quot; or &amp;quot;no&amp;quot;a. No - commercial use in structureb. No - retail use in structurec. No- Permanent residenced. No- Rehab housee. No- Transitional housingf. No- Communal dining facilityg. No-Treatment servicesh. No -Assisted livingi. No - Dormitoriesj. No - Counselingk. No - separate room/bed rentalI. No- other services/usesm. Yes- each unit has its own self-contained kitchenn. Yes- each dwelling unit has its own bathroomo. Yes- there is a community facility or manager&amp;#39;s office on sitep. No- No part of structures are used by members of the general public</text_data><comment_date>2018-06-19T00:00:00</comment_date></row><row _id="row-4vvc.66tq-mh4y" _uuid="00000000-0000-0000-1397-6CDBA44768C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4vvc.66tq-mh4y"><intent_id>1070538</intent_id><project_id>922409</project_id><text_data>Job 2025</text_data><comment_date>2020-07-08T00:00:00</comment_date></row><row _id="row-9sa4.352k-t4sw" _uuid="00000000-0000-0000-7B07-2954A3821D93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9sa4.352k-t4sw"><intent_id>527391</intent_id><project_id>693110</project_id><text_data>While there is non landscaping work on this project, the only work we will be performing will be within the landscaping section of the work already approved on the prime contractors statement of intent and should still be allowed as landscape construction.</text_data><comment_date>2012-08-14T00:00:00</comment_date></row><row _id="row-dv5b~zhi2~n5xq" _uuid="00000000-0000-0000-060F-94BB4FA62A24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dv5b~zhi2~n5xq"><intent_id>661868</intent_id><project_id>744759</project_id><text_data>street sweeping</text_data><comment_date>2014-10-23T00:00:00</comment_date></row><row _id="row-ayhp-era8_5c3q" _uuid="00000000-0000-0000-10B7-BBAEF248A814" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ayhp-era8_5c3q"><intent_id>1250696</intent_id><project_id>1022762</project_id><text_data>Troubleshoot lightsresidential structure2livingnonoyesnononononononononononono</text_data><comment_date>2022-07-20T00:00:00</comment_date></row><row _id="row-bw59.9e28_b3mk" _uuid="00000000-0000-0000-ADFF-421DB8C1B72F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bw59.9e28_b3mk"><intent_id>511554</intent_id><project_id>657757</project_id><text_data>We are an Oregon Contractor with employees residing in Oregon Only.  We are not required to have an Industrial Insurance account.</text_data><comment_date>2012-05-11T00:00:00</comment_date></row><row _id="row-4fr4-xr4g_7iq9" _uuid="00000000-0000-0000-6AEF-EA4EA3F57C52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4fr4-xr4g_7iq9"><intent_id>914620</intent_id><project_id>854635</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2018-06-28T00:00:00</comment_date></row><row _id="row-ateh_eexa.dkpu" _uuid="00000000-0000-0000-05E7-FD9239D501D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ateh_eexa.dkpu"><intent_id>1031619</intent_id><project_id>904553</project_id><text_data>Fiber Optic Rework of Network</text_data><comment_date>2020-01-14T00:00:00</comment_date></row><row _id="row-yeip~sxcc_qr5r" _uuid="00000000-0000-0000-BE01-AA0AF4A83997" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yeip~sxcc_qr5r"><intent_id>599015</intent_id><project_id>721867</project_id><text_data>***Approval of this form does not signify approval of the specific classification(s) of labor listed by your firm on the form. The basis for approval is the criteria that the prevailing rate of wage/benefits provided equals or exceeds the amount(s) published for the classification(s) of labor listed.***</text_data><comment_date>2014-05-27T00:00:00</comment_date></row><row _id="row-c6zq_mypg_qfni" _uuid="00000000-0000-0000-33D3-6666AE78FA9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6zq_mypg_qfni"><intent_id>1089464</intent_id><project_id>932135</project_id><text_data>Other Trucks = Lowboy and Water trucks</text_data><comment_date>2020-09-30T00:00:00</comment_date></row><row _id="row-xudx_qqsn_wvv4" _uuid="00000000-0000-0000-0BD3-591B80CE287F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xudx_qqsn_wvv4"><intent_id>516705</intent_id><project_id>689520</project_id><text_data>Form filed by: Torie AllenSoft floor layer/This is for a job order contract for KCDA Purchasing COOP.</text_data><comment_date>2012-06-13T00:00:00</comment_date></row><row _id="row-nh9j~uegw~fdqu" _uuid="00000000-0000-0000-F1BF-4EE6989F7B4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nh9j~uegw~fdqu"><intent_id>1248819</intent_id><project_id>1021768</project_id><text_data>#1 - Urgent request to repair or replace a tank style water heater. #2 - single family dwelling #3 - one #4 - (a) no (b) no (c) yes (d) no (e) no (f) no (g) no (h) no (I) no (j) no (k) no (l) no #5 - yes #6 - yes #7 - no #8 � no</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-qwg4~78bn_74q3" _uuid="00000000-0000-0000-4E6D-38B1C1257CED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qwg4~78bn_74q3"><intent_id>1418213</intent_id><project_id>1117314</project_id><text_data>PTL SO#164676</text_data><comment_date>2024-04-10T00:00:00</comment_date></row><row _id="row-6cec-hurb-uvi9" _uuid="00000000-0000-0000-C4D7-CC4FC1544389" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6cec-hurb-uvi9"><intent_id>1055787</intent_id><project_id>917902</project_id><text_data>All work will performed by subcontractors, except for possible punch-list items and/or possible site clean-up.</text_data><comment_date>2020-05-05T00:00:00</comment_date></row><row _id="row-kria~4f77~2ceg" _uuid="00000000-0000-0000-FDF3-F7E4B5D59943" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kria~4f77~2ceg"><intent_id>541340</intent_id><project_id>698392</project_id><text_data>Please reference Intent 492091</text_data><comment_date>2012-10-23T00:00:00</comment_date></row><row _id="row-gk9m_e94r.9989" _uuid="00000000-0000-0000-F650-DEDFCC95D1C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gk9m_e94r.9989"><intent_id>623418</intent_id><project_id>732371</project_id><text_data>Contract 33915-April 1,2014 thru March 31,2015Quarterly Billings/Affidavit Filings</text_data><comment_date>2014-04-04T00:00:00</comment_date></row><row _id="row-nkrp.kanw~g5w6" _uuid="00000000-0000-0000-6BFB-71723035384B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nkrp.kanw~g5w6"><intent_id>461282</intent_id><project_id>668255</project_id><text_data>Other Trucks:  escort truck;   General labor:  cleanup of  site; backfilling; staging work area by hand; all by hand or with shovel.</text_data><comment_date>2011-07-01T00:00:00</comment_date></row><row _id="row-er2q~qjdc-w2ky" _uuid="00000000-0000-0000-C4DE-139B5CBD7292" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-er2q~qjdc-w2ky"><intent_id>733085</intent_id><project_id>776495</project_id><text_data>Track repair using hand tools only</text_data><comment_date>2015-11-25T00:00:00</comment_date></row><row _id="row-yg43~fsat_6qn8" _uuid="00000000-0000-0000-2B0F-8692E01FCFF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yg43~fsat_6qn8"><intent_id>832239</intent_id><project_id>813669</project_id><text_data>Again we are perform both types of work - installing signs and striping.  Clearly two different catagories.</text_data><comment_date>2017-06-09T00:00:00</comment_date></row><row _id="row-aw3a~98yq-y72b" _uuid="00000000-0000-0000-621A-EA3781E3390E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aw3a~98yq-y72b"><intent_id>669095</intent_id><project_id>750399</project_id><text_data>THERE WAS WATER INTRUSION INTO SEPTIC TANK WHICH WAS CAUSING THE TANK TO BACK UP.  WE ARRIVED ON SITE TO PUMP SEPTIC TANK. RECOMMENDED RISERS BE INSTALLED TO SEAL AROUND LIDS TO PREVENT WATER INTRUSTION.WE PUMPED TANK, INSTALLED RISERS. LABORERS DUG UP TANK AND INSTALLED RISERS AND PUMPED TANK</text_data><comment_date>2014-12-30T00:00:00</comment_date></row><row _id="row-6dti.sxyc-hvus" _uuid="00000000-0000-0000-62C1-3353915F77A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6dti.sxyc-hvus"><intent_id>1274458</intent_id><project_id>1035150</project_id><text_data>The owner, under Landscape Construction, dug the holes and set the sign posts in concrete that was mixed by hand in a wheelbarrow. The owner also hauled the debris away in a pickup truck to the dump site. The maintenance worker used gas powered hedge trimmers and string trimmers to clear brush from around the perimeter. They also picked up garbage and scraps that were illegally dumped on the site and put them in the truck for removal.</text_data><comment_date>2022-11-15T00:00:00</comment_date></row><row _id="row-fbjw.z7kx~us9e" _uuid="00000000-0000-0000-FE81-33DB3E613174" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fbjw.z7kx~us9e"><intent_id>553988</intent_id><project_id>703888</project_id><text_data>Change a filter on furnace</text_data><comment_date>2013-02-01T00:00:00</comment_date></row><row _id="row-3vzy_i36n_93p8" _uuid="00000000-0000-0000-3CAF-109D24DD723D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vzy_i36n_93p8"><intent_id>571718</intent_id><project_id>711877</project_id><text_data>Washington Middle School - 3100 Cain Rd SE, Olympia, WA  98501Roosevelt Elementary School - 1417 San Francisco Ave NE, Olympia, WA  98506</text_data><comment_date>2013-05-28T00:00:00</comment_date></row><row _id="row-n5cy-qh7a.iey9" _uuid="00000000-0000-0000-2825-4BB824E85CEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n5cy-qh7a.iey9"><intent_id>669909</intent_id><project_id>750812</project_id><text_data>PC - 6 P.O. No. 148540OB</text_data><comment_date>2014-12-15T00:00:00</comment_date></row><row _id="row-jwsz~rkjp_wqw8" _uuid="00000000-0000-0000-7825-5B309974C19F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jwsz~rkjp_wqw8"><intent_id>1317052</intent_id><project_id>1054168</project_id><text_data>Other Truck - Equipment Haul using a Kenworth 6x4 Bogie Axle 56,000 GVW Diesel</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-g6yt.h6jv~kuvh" _uuid="00000000-0000-0000-B6EB-D6C3C76DB34C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g6yt.h6jv~kuvh"><intent_id>705850</intent_id><project_id>766787</project_id><text_data>Vacuum hole for new poleMotorPat Grader to vacuum hole for new pole placement</text_data><comment_date>2015-07-08T00:00:00</comment_date></row><row _id="row-jgi9.7c3u-vpqb" _uuid="00000000-0000-0000-4133-6FAEE6986217" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgi9.7c3u-vpqb"><intent_id>1145321</intent_id><project_id>898545</project_id><text_data>20NOA172</text_data><comment_date>2021-05-18T00:00:00</comment_date></row><row _id="row-6ahn.md8j_8gs5" _uuid="00000000-0000-0000-F835-54F240B37384" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ahn.md8j_8gs5"><intent_id>1310894</intent_id><project_id>1057976</project_id><text_data>Project# 04240, Holder, Janet, 11612 N Sheridan St, Lot E38, Mead, WA 99021</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-3vx9-sq58.i97r" _uuid="00000000-0000-0000-273F-A17D645D9FAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vx9-sq58.i97r"><intent_id>459284</intent_id><project_id>666907</project_id><text_data>General Laborer:     Erosion Control Installation / Maintenance; Shoveling; Raking                     Small Hand Tools, Sledge Hammer / Fence Post Pounder; Shovel, Rake, LuteTruck Driver Other:  Tractor w/ 3-Axle Lowboy (Equipment) Trailer</text_data><comment_date>2011-06-07T00:00:00</comment_date></row><row _id="row-gv3g-za8y-yja3" _uuid="00000000-0000-0000-7AD7-C2F879063C0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gv3g-za8y-yja3"><intent_id>857118</intent_id><project_id>830436</project_id><text_data>Sorry. I had entered a comma instead of period for cents.</text_data><comment_date>2017-09-07T00:00:00</comment_date></row><row _id="row-qqnr-4zkg.z3vv" _uuid="00000000-0000-0000-1637-04FFFD9F4AD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qqnr-4zkg.z3vv"><intent_id>755679</intent_id><project_id>789185</project_id><text_data>(1)INSULATION (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO B-NO C-YES D-NO E-NO F-NO G-NO H-NO I-NO J-NO K-? (5)YES (6)YES (7)NO (8)NO</text_data><comment_date>2016-04-08T00:00:00</comment_date></row><row _id="row-2q7w~ef4g_4vsn" _uuid="00000000-0000-0000-5D17-1072800F43D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2q7w~ef4g_4vsn"><intent_id>1111122</intent_id><project_id>931781</project_id><text_data>To include installation of in ground sprinkler system, trees, shrubs, compost/barkdust to 2: depth.  Does not include topsoil which was bid by others - Possible equipment to be used, small trencher, shovels, rakes.  Kubota model U17 15 horsepower excavator weighing approx 3700 pounds.</text_data><comment_date>2020-12-21T00:00:00</comment_date></row><row _id="row-4zdy~kzs2-jgnu" _uuid="00000000-0000-0000-1755-7B32A9A716E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4zdy~kzs2-jgnu"><intent_id>1252158</intent_id><project_id>1013464</project_id><text_data>POWERCOM JOB #550311</text_data><comment_date>2022-07-26T00:00:00</comment_date></row><row _id="row-ihka~dnu3~myqy" _uuid="00000000-0000-0000-D307-649F78E79FC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihka~dnu3~myqy"><intent_id>800073</intent_id><project_id>806640</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2016-11-10T00:00:00</comment_date></row><row _id="row-r9vt~4dnr-kqkt" _uuid="00000000-0000-0000-5517-60CD7B58DBAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9vt~4dnr-kqkt"><intent_id>1111106</intent_id><project_id>904915</project_id><text_data>Contract #3064Project #920184Romero 7610 W. Nobhill Blvd. #168Yakima, WA 98908</text_data><comment_date>2020-12-21T00:00:00</comment_date></row><row _id="row-5r5y_a33m_iw36" _uuid="00000000-0000-0000-B5F1-D59E9CE1F9DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5r5y_a33m_iw36"><intent_id>959362</intent_id><project_id>872795</project_id><text_data>1.kitchen and bath remodel 2.apt 3.2 4.a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no l.n/a 5.yes 6.yes 7.yes 8.no</text_data><comment_date>2019-02-07T00:00:00</comment_date></row><row _id="row-m5ec-f5es_xue3" _uuid="00000000-0000-0000-AB6C-73285CCBB224" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m5ec-f5es_xue3"><intent_id>578621</intent_id><project_id>712159</project_id><text_data>013046</text_data><comment_date>2013-07-01T00:00:00</comment_date></row><row _id="row-hhx8-jcv6~4krv" _uuid="00000000-0000-0000-353F-1EE90DB06ED9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hhx8-jcv6~4krv"><intent_id>965656</intent_id><project_id>875786</project_id><text_data>Our tasks are to maintain existing landscaping by mowing, edging, weed eating, blowing, pruning and weeding, The equipment used will be mowers, blowers, edgers, weed eaters and hand tools. We are not changing existing landscape - maintenance only.</text_data><comment_date>2019-03-15T00:00:00</comment_date></row><row _id="row-hdpp~xuj9-yn6u" _uuid="00000000-0000-0000-330B-65F46EBEAB45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hdpp~xuj9-yn6u"><intent_id>1097239</intent_id><project_id>935825</project_id><text_data>Access Control work will be performed inside the building. Access control cabling.</text_data><comment_date>2020-10-20T00:00:00</comment_date></row><row _id="row-8w5x_kxyd_yaa3" _uuid="00000000-0000-0000-F090-39F2DE4B3AB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8w5x_kxyd_yaa3"><intent_id>511624</intent_id><project_id>553184</project_id><text_data>For projects with a bid due date of 04/10/2012 forward, all claimed fringe benefits must be calculated on the annualized figure of 2,080 and workers must be compensated based upon this calculation method.</text_data><comment_date>2012-05-14T00:00:00</comment_date></row><row _id="row-pvjp.sk2u.7fgd" _uuid="00000000-0000-0000-0165-459FB25F6B8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pvjp.sk2u.7fgd"><intent_id>750583</intent_id><project_id>781213</project_id><text_data>Project Scope:  Early site work for road infrastructure.Our Scope:  Curb &amp; gutter; sidewalk; pedestrian ramp.Concrete Crewman:  Forming of all curb &amp; gutter, sidewalk, and pedestrian ramp with the use of skill saws, hammers, nails, stakes.Cement Finisher Tender:  Placing and finishing of concrete of all curb &amp; gutter, sidewalk, and pedestrian ramp  with the use of trowels &amp; broom.</text_data><comment_date>2016-03-14T00:00:00</comment_date></row><row _id="row-msbu~yktk-ghaq" _uuid="00000000-0000-0000-6B80-2CF10B3CD372" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-msbu~yktk-ghaq"><intent_id>1316204</intent_id><project_id>1012522</project_id><text_data>1.5 hrs worked on 3/22/2023</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-zmwd_zrs6.5z2g" _uuid="00000000-0000-0000-B566-BE4CA9ABB678" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zmwd_zrs6.5z2g"><intent_id>1249989</intent_id><project_id>1022391</project_id><text_data>1.- General weatherization /Repairs/ Energy upgrades.2.- Single home3.- 1 level4.- a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-no.5.- yes6.- yes7.- no8.- no</text_data><comment_date>2022-07-18T00:00:00</comment_date></row><row _id="row-92va-wgs9.fefu" _uuid="00000000-0000-0000-9618-D1C09D60E5BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-92va-wgs9.fefu"><intent_id>750638</intent_id><project_id>763048</project_id><text_data>$3.77 medical, $1.05 vacation, $.53 holiday</text_data><comment_date>2016-03-17T00:00:00</comment_date></row><row _id="row-5rc2.4h3e_imr8" _uuid="00000000-0000-0000-ABDB-B41C433751A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5rc2.4h3e_imr8"><intent_id>624341</intent_id><project_id>725606</project_id><text_data>Electricians � Inside:Health: $7.45Pension: $9.66Training: $0.58Total: $17.69 JOB 42216</text_data><comment_date>2014-04-10T00:00:00</comment_date></row><row _id="row-f2h4_mgkc.kdmq" _uuid="00000000-0000-0000-3156-EC84893BE6F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f2h4_mgkc.kdmq"><intent_id>655428</intent_id><project_id>737198</project_id><text_data>We are vactor truck service and will be sucking mud up into our trucks....the laborer should have been a nozzleman not a general laborer.  We are a sub on this project....what do you mean describe the whole project?</text_data><comment_date>2014-09-29T00:00:00</comment_date></row><row _id="row-izng_qq6r-pzbr" _uuid="00000000-0000-0000-C809-D43DD3010B9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-izng_qq6r-pzbr"><intent_id>1189120</intent_id><project_id>972846</project_id><text_data>Owner may or may not do work on this project</text_data><comment_date>2021-10-28T00:00:00</comment_date></row><row _id="row-f6uy_85zp.7npe" _uuid="00000000-0000-0000-A8D3-506C0F168CAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f6uy_85zp.7npe"><intent_id>1052594</intent_id><project_id>916297</project_id><text_data>Other trucks = Water Truck 1995 Ford 56,000 GWT</text_data><comment_date>2020-04-23T00:00:00</comment_date></row><row _id="row-6rx2_timt-kn2i" _uuid="00000000-0000-0000-2366-DAF8213F4FA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6rx2_timt-kn2i"><intent_id>920543</intent_id><project_id>856806</project_id><text_data>Simple network cabling.</text_data><comment_date>2018-08-07T00:00:00</comment_date></row><row _id="row-nfbq_5h2v~hq2p" _uuid="00000000-0000-0000-9401-C53C6C0C1775" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nfbq_5h2v~hq2p"><intent_id>824420</intent_id><project_id>814399</project_id><text_data>17-23-2131</text_data><comment_date>2017-04-04T00:00:00</comment_date></row><row _id="row-3vbp~ku7b_ta8t" _uuid="00000000-0000-0000-48A1-5D07AEF4756E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vbp~ku7b_ta8t"><intent_id>1277813</intent_id><project_id>1036471</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Rebuild deck at single family residence.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Yes#3 - Including any basement or garage, how many stories or levels does the structure have? 2#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No (b) Any retail use in the structure? No (c) Permanent residence only? Yes (d) Rehabilitation house? No (e) Transitional housing? No (f) Communal dining facility? No (g) Treatment services? No (h) Assisted living services? No (I) Dormitories? No (j) Counseling? No (k) Is each room and/or bed in the structure rented separately? No (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? There is one kitchen for the house#6 - Does each dwelling unit have its own bathroom?Three bathrooms for the four bedroom house#7 - Is there a community facility or manager�s office on site? No#8 - Is any part of the structure used by members of the public?No</text_data><comment_date>2022-10-26T00:00:00</comment_date></row><row _id="row-8wxa~m3hh~rfp4" _uuid="00000000-0000-0000-1459-F0467F97CE3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8wxa~m3hh~rfp4"><intent_id>855139</intent_id><project_id>830077</project_id><text_data>maint school yr 09/01/17 thru 08/31/18</text_data><comment_date>2017-08-16T00:00:00</comment_date></row><row _id="row-fs5z-us8u-fxgu" _uuid="00000000-0000-0000-8AF8-2B3CB8B09C41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fs5z-us8u-fxgu"><intent_id>502197</intent_id><project_id>683262</project_id><text_data>Job # 80054</text_data><comment_date>2012-02-29T00:00:00</comment_date></row><row _id="row-chcv.6p6a_wmr5" _uuid="00000000-0000-0000-F32C-B255FEA14A1B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-chcv.6p6a_wmr5"><intent_id>589080</intent_id><project_id>718265</project_id><text_data>Franklin Message Board Installation</text_data><comment_date>2013-08-21T00:00:00</comment_date></row><row _id="row-vrpq-2aif~zd8y" _uuid="00000000-0000-0000-C1AC-26BE61EAF94B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vrpq-2aif~zd8y"><intent_id>1199817</intent_id><project_id>992115</project_id><text_data>This is a project for Lakehaven Water &amp; Sewer District for various sites for landscape maintenance in Pierce County.  Work will include mowing, trimming, edging, pruning, raking, blowing of surfaces, leaf fall and litter removal, and weed removal.  Equipment to be used will consist of walk behind mowers, edgers, line trimmers, backpack blowers, buckets, rakes, shovels, and various hand tools. This is year 2 of a 3-year contract utilizing the same PO number.  Service begins on January 1, 2022, through December 31, 2022.</text_data><comment_date>2021-12-16T00:00:00</comment_date></row><row _id="row-9d3y.pbcf_9dwn" _uuid="00000000-0000-0000-9CD1-3B5452D4DDA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9d3y.pbcf_9dwn"><intent_id>822322</intent_id><project_id>810473</project_id><text_data>Randy Stout is owner/operator, sole proprietor for Affordable Crane Service</text_data><comment_date>2017-03-23T00:00:00</comment_date></row><row _id="row-zx6n~fb8p.9sum" _uuid="00000000-0000-0000-8661-CDB9AF29F292" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zx6n~fb8p.9sum"><intent_id>944893</intent_id><project_id>847102</project_id><text_data>Job 1183</text_data><comment_date>2018-11-08T00:00:00</comment_date></row><row _id="row-p5tn_nj9h_7gt9" _uuid="00000000-0000-0000-DA91-A4F00CAF32FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p5tn_nj9h_7gt9"><intent_id>597533</intent_id><project_id>721344</project_id><text_data>***This form is being approved on the basis of your statement that your contracted work is not covered under the prevailing wage statutes and rules per the provisions under SB 5538. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-10-09T00:00:00</comment_date></row><row _id="row-v2hm_t29q.xjq4" _uuid="00000000-0000-0000-ADB8-9FD508280154" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v2hm_t29q.xjq4"><intent_id>767496</intent_id><project_id>792888</project_id><text_data>1. Install bath fan2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. No</text_data><comment_date>2016-06-10T00:00:00</comment_date></row><row _id="row-d94c-ejte-2qpv" _uuid="00000000-0000-0000-04CA-505C3E319B6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d94c-ejte-2qpv"><intent_id>1259663</intent_id><project_id>934115</project_id><comment_date>2022-08-19T00:00:00</comment_date></row><row _id="row-resy_xz98_ek34" _uuid="00000000-0000-0000-E9BE-07F57F19A6F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-resy_xz98_ek34"><intent_id>1189537</intent_id><project_id>979249</project_id><text_data>Asphalt Patching Repair in a parking lot</text_data><comment_date>2021-10-29T00:00:00</comment_date></row><row _id="row-r6aj-wi7e.kfw2" _uuid="00000000-0000-0000-4C16-8407939F16E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r6aj-wi7e.kfw2"><intent_id>733401</intent_id><project_id>772462</project_id><text_data>Filed by Raean Secanti</text_data><comment_date>2015-11-30T00:00:00</comment_date></row><row _id="row-tfjs.6yyx.2h8u" _uuid="00000000-0000-0000-6DF3-B282B13C309C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tfjs.6yyx.2h8u"><intent_id>258009</intent_id><project_id>495873</project_id><text_data>Rough-in installation of 12&amp;quot; of topsoil done by owner. The landscape laborer was only used for plantings in the top  6&amp;quot; of topsoil.</text_data><comment_date>2012-03-06T00:00:00</comment_date></row><row _id="row-qsr6_sv7e.mgnq" _uuid="00000000-0000-0000-E1E2-4E52D0380A6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qsr6_sv7e.mgnq"><intent_id>694933</intent_id><project_id>759305</project_id><text_data>Owner/Operator</text_data><comment_date>2015-05-16T00:00:00</comment_date></row><row _id="row-cfxc.ju3j.wrg9" _uuid="00000000-0000-0000-82DC-890858971106" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cfxc.ju3j.wrg9"><intent_id>1217386</intent_id><project_id>1003287</project_id><text_data>General tools used by our technicians for electrical component equipment service      Multi-Meter, insulated screwdriver, wire nuts, safety locks for lockout/tagout, insulated Allen wrenches.    All technicians use company supplied vehicles to arrive at job site</text_data><comment_date>2022-03-12T00:00:00</comment_date></row><row _id="row-8qfu-wnh9.fvr9" _uuid="00000000-0000-0000-69C9-A61D9F49114D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8qfu-wnh9.fvr9"><intent_id>945033</intent_id><project_id>847147</project_id><text_data>Filed by John Welcher</text_data><comment_date>2018-11-09T00:00:00</comment_date></row><row _id="row-6cf8~bdps~3vfy" _uuid="00000000-0000-0000-8676-7C9E6833C555" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6cf8~bdps~3vfy"><intent_id>1252406</intent_id><project_id>1019324</project_id><text_data>VE 16842</text_data><comment_date>2022-07-26T00:00:00</comment_date></row><row _id="row-44zb-9tgk-uwf8" _uuid="00000000-0000-0000-1D53-51D0AB797925" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-44zb-9tgk-uwf8"><intent_id>911135</intent_id><project_id>853347</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Install Tub Surround &amp; Fan, Ceiling &amp; Wall Repair, Electrical &amp; wall repair  #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment #3 - Including any basement or garage, how many stories or levels does the structure have? 3 Stories #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No (b) Any retail use in the structure? No(c) Permanent residence only? Yes (d) Rehabilitation house? No(e) Transitional housing? No(f) Communal dining facility? No (g) Treatment services? No (h) Assisted living services? No (I) Dormitories? No (j) Counseling? No (k) Is each room and/or bed in the structure rented separately? No (l) Other? N/A #5 - Does each dwelling unit have its own self-contained kitchen? Yes #6 - Does each dwelling unit have its own bathroom? Yes #7 - Is there a community facility or manager�s office on site? Yes #8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2018-06-13T00:00:00</comment_date></row><row _id="row-hbbm_2smw.ar4d" _uuid="00000000-0000-0000-6346-BB6C3EA11891" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hbbm_2smw.ar4d"><intent_id>588590</intent_id><project_id>705802</project_id><text_data>Job # 60709 related to C10277</text_data><comment_date>2013-08-20T00:00:00</comment_date></row><row _id="row-auty-9cs4_4khd" _uuid="00000000-0000-0000-B5E6-33A40B6C6587" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-auty-9cs4_4khd"><intent_id>613987</intent_id><project_id>728174</project_id><text_data>more details--Service call to change out a solid state contactor and overload relay. Test sytem after replacement. Tools needed: screwdrivers, hex key wrenches, electrical multimeter, amp clamp, gloves and safety glasses. Use of hands and fingers to remove and replace necessary parts.Work area is outside, at the lift station panel located on the east side of NW State Street, accross from the Chehalis Foursquare Church.</text_data><comment_date>2014-01-31T00:00:00</comment_date></row><row _id="row-yf6u~mxps-jmhj" _uuid="00000000-0000-0000-5543-68E08BCDF11A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yf6u~mxps-jmhj"><intent_id>1067069</intent_id><project_id>887836</project_id><text_data>PPC #19280</text_data><comment_date>2020-06-22T00:00:00</comment_date></row><row _id="row-m7k4~fugf~8td6" _uuid="00000000-0000-0000-C3B1-0D9AA829593D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7k4~fugf~8td6"><intent_id>1253689</intent_id><project_id>1024307</project_id><text_data>Fringe amount $24.69 includes $15.39 (pension), $8.30 (medical), and $1.00 (apprentice program). Fringe amount $17.46 includes $8.72 (pension), $8.20 (medical) and $.54 (apprentice program).</text_data><comment_date>2022-07-29T00:00:00</comment_date></row><row _id="row-3iiv~pc4z~pcta" _uuid="00000000-0000-0000-E01F-709B36FBE42C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3iiv~pc4z~pcta"><intent_id>1042578</intent_id><project_id>910845</project_id><text_data>weatherize home 2. single family 3. 1 or 2 4. a. no b. no c. yes d. no e. no f. no g. no h. no I. no j. no k. yes 6. yes 7. no 8. no</text_data><comment_date>2020-03-03T00:00:00</comment_date></row><row _id="row-zqd2.uudk.qyv4" _uuid="00000000-0000-0000-2EC3-E14AF8B5F397" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zqd2.uudk.qyv4"><intent_id>629330</intent_id><project_id>733551</project_id><text_data>Truck Driver / Other Trucks = Oil Distributor Operator (paving fabric install)</text_data><comment_date>2014-05-14T00:00:00</comment_date></row><row _id="row-hy2z.hkrv~k7tc" _uuid="00000000-0000-0000-CB16-B80E428B2848" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hy2z.hkrv~k7tc"><intent_id>600700</intent_id><project_id>721617</project_id><text_data>General Labor work consists of hand work (i.e.-shovel work) and/or pilot car driver. Motor patrol grader (non-finish) - used for grading the project site for compaction before paving operations. Other trucks consist of the following: 1)  0-8,000 gallon water truck - used for watering the roadway for compaction and/or dust control (if needed).     31.77 (base rate) plus 7.94 (fringe) 2)  Oil Distributor - used for distribution of oil during chip sealing operations.     32.42 (based rate) plus 8.10 (fringe)</text_data><comment_date>2013-10-22T00:00:00</comment_date></row><row _id="row-e3mj-g2p5~r4f2" _uuid="00000000-0000-0000-A79A-F5131062A8C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e3mj-g2p5~r4f2"><intent_id>504685</intent_id><project_id>682845</project_id><text_data>Form filed by: Tom Niebroegge - murq235</text_data><comment_date>2012-03-21T00:00:00</comment_date></row><row _id="row-9apw~vfn6~c9r6" _uuid="00000000-0000-0000-3A0B-B51C5DAF5996" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9apw~vfn6~c9r6"><intent_id>1190601</intent_id><project_id>986470</project_id><text_data>sr50899426</text_data><comment_date>2021-11-03T00:00:00</comment_date></row><row _id="row-un6d.x8av_btaf" _uuid="00000000-0000-0000-B264-757826C59451" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-un6d.x8av_btaf"><intent_id>920902</intent_id><project_id>856947</project_id><text_data>Other truck is a water truck</text_data><comment_date>2018-07-25T00:00:00</comment_date></row><row _id="row-tk6u~zdfk-63zg" _uuid="00000000-0000-0000-4584-C63004336D40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tk6u~zdfk-63zg"><intent_id>507357</intent_id><project_id>685271</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2012-04-17T00:00:00</comment_date></row><row _id="row-dq89~r68b~u6xh" _uuid="00000000-0000-0000-5119-ED0E5A9D7DD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dq89~r68b~u6xh"><intent_id>702963</intent_id><project_id>742468</project_id><text_data>Truck driver for a water tanker truck that automatically sprays water on the road bed for compaction through a set of spray bars on the truck</text_data><comment_date>2015-06-24T00:00:00</comment_date></row><row _id="row-4f4j.4fb5.exst" _uuid="00000000-0000-0000-3638-FDCDA2ACDEF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4f4j.4fb5.exst"><intent_id>1278699</intent_id><project_id>1028976</project_id><text_data>Job: Laboon#1 - heat pump electrical hook up #2 - single family dwelling #3 - 1 #4 - residence (a) no c) yes (d)no (e) no (f) no (g)no (h)no (i) no (j) no (k) no #5 - yes #6 - yes #7 - no #8 - no</text_data><comment_date>2022-10-28T00:00:00</comment_date></row><row _id="row-8sgg_r9at-wrci" _uuid="00000000-0000-0000-5CFB-051B6088178B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8sgg_r9at-wrci"><intent_id>1121671</intent_id><project_id>950177</project_id><text_data>PROIVIDE LABOR AND MATERIALS TO SPLICE AND REPAIR EXISTING 48 STRAND SM FOC TO NE CORNDER OF 3RD AND CENTRAL</text_data><comment_date>2021-02-11T00:00:00</comment_date></row><row _id="row-k599_5igm~rg5i" _uuid="00000000-0000-0000-0B6B-1DF866899EFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k599_5igm~rg5i"><intent_id>1002041</intent_id><project_id>881694</project_id><text_data>Apply hydroseed as directed around new portable</text_data><comment_date>2019-08-23T00:00:00</comment_date></row><row _id="row-aids.ux2c~thnq" _uuid="00000000-0000-0000-471D-41D60FE1DEC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aids.ux2c~thnq"><intent_id>760784</intent_id><project_id>783278</project_id><text_data>other trucks. 4,000 gallon water truck</text_data><comment_date>2016-05-12T00:00:00</comment_date></row><row _id="row-zpxk_ars9~9z7b" _uuid="00000000-0000-0000-AE2A-636958D84A5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zpxk_ars9~9z7b"><intent_id>1031820</intent_id><project_id>885699</project_id><comment_date>2020-01-15T00:00:00</comment_date></row><row _id="row-2u4z~yeug-64dh" _uuid="00000000-0000-0000-E84F-A06935BB28AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2u4z~yeug-64dh"><intent_id>828904</intent_id><project_id>819078</project_id><text_data>TIME AND MATERIALS</text_data><comment_date>2017-04-25T00:00:00</comment_date></row><row _id="row-m6x6_w5ba.y67j" _uuid="00000000-0000-0000-C86C-4EA28E34885D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6x6_w5ba.y67j"><intent_id>590505</intent_id><project_id>690593</project_id><text_data>132076 Ballard Bridge</text_data><comment_date>2013-08-28T00:00:00</comment_date></row><row _id="row-dqee~pnnd.b9pu" _uuid="00000000-0000-0000-B3AA-0FA63B3BE684" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dqee~pnnd.b9pu"><intent_id>875467</intent_id><project_id>837725</project_id><text_data>Filed by Sean Payton</text_data><comment_date>2017-11-17T00:00:00</comment_date></row><row _id="row-b4hi_8r7s-iq2s" _uuid="00000000-0000-0000-0AD2-C3A4D15EA6F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b4hi_8r7s-iq2s"><intent_id>789142</intent_id><project_id>802406</project_id><text_data>The whole project is 1)Cleaning, 2)Crackfill, 3)Seal Coat, &amp; 4)Stripe 3 STA Park and Ride Lots in the Spokane and Cheney area.  They are Liberty Lake Park &amp; Ride Lot at 1400 N Meadowood Ln, Spokane Valley Park &amp; Ride at 13500 E Indiana, and the Cheney Park &amp; Ride lot &amp;quot;K&amp;quot; Street.1)	 If the area is dirty, the laborers will use a power backpack blower to get the loose dirt off asphalt and out of the cracks. They�ll use brooms and shovels for any heavy sediment.2)	The laborers used a CRAFCO machine (E-Z Pour Melter)to dispense a product to fill cracks. You can look at it on their website. I am a female and have learned how to use it on the boss&amp;#39;s driveway. It is like decorating a huge cake! While one places the material in the crack, the other squeege&amp;#39;s it with a long handled brush to make it flush with the asphalt.  A third person  is needed to continue moving the truck which holds the trailer with the CRAFCO machine on it.3)	Same process as crack fill, except one man sprays on the sealer and another is driving the vehicle forward.  Sometimes they will use a squeegee to spread any excess sealer.4)	24 hours later, we use a commercial sprayer and stencils to paint lot and laborer just helps keep things out of the way and clean for the painter.</text_data><comment_date>2016-09-21T00:00:00</comment_date></row><row _id="row-6x7g~i42z.vfc4" _uuid="00000000-0000-0000-3E96-D48D3D080AED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6x7g~i42z.vfc4"><intent_id>1160657</intent_id><project_id>878466</project_id><text_data>119065-001</text_data><comment_date>2021-07-15T00:00:00</comment_date></row><row _id="row-tk7w~whux_7wg8" _uuid="00000000-0000-0000-F548-1BBF634C653A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tk7w~whux_7wg8"><intent_id>875410</intent_id><project_id>837706</project_id><text_data>recurring quarterly service</text_data><comment_date>2017-11-16T00:00:00</comment_date></row><row _id="row-682g-2g4e-nnjt" _uuid="00000000-0000-0000-4774-3BB06D959C26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-682g-2g4e-nnjt"><intent_id>671689</intent_id><project_id>731826</project_id><text_data>Filed by Monica VanWagoner*Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 23 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following Crafts/Trades/Occupations.</text_data><comment_date>2014-12-31T00:00:00</comment_date></row><row _id="row-mpxd-bj9y.qmwy" _uuid="00000000-0000-0000-0285-1E93906219D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpxd-bj9y.qmwy"><intent_id>555481</intent_id><project_id>689973</project_id><text_data>TRUCK DRIVER OTHER USED FOR TRUCK MOUNTED PICKUP SWEEPER</text_data><comment_date>2013-02-08T00:00:00</comment_date></row><row _id="row-d7cs-46wh.w7ev" _uuid="00000000-0000-0000-215A-E9BF2415B101" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7cs-46wh.w7ev"><intent_id>450136</intent_id><project_id>662523</project_id><text_data>Industrial Insurance Account Id: 208,043-00</text_data><comment_date>2011-04-13T00:00:00</comment_date></row><row _id="row-9hqn.d58k-5jf9" _uuid="00000000-0000-0000-92FC-6624345E2A78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9hqn.d58k-5jf9"><intent_id>610329</intent_id><project_id>721737</project_id><text_data>&amp;quot;Project is exempt from State Prevailing wage requirements based on The Housing Act of 1937 and CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades/occupations&amp;quot; SKIDSTEER OPERATOR</text_data><comment_date>2014-01-01T00:00:00</comment_date></row><row _id="row-jbm5_d74n_uxb7" _uuid="00000000-0000-0000-12E1-A4F513E9637C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jbm5_d74n_uxb7"><intent_id>873374</intent_id><project_id>836846</project_id><text_data>Lind School District #158206 W 3rd St.Lind, WA 99341Estimate for Sewer Line ReplacementBelow is a three-part estimate- the first part of the estimate being the most critical for the compromised sewer line, the second part being a separate issue that we found with the 4� pipe that is back graded tying into the main 8� sewer up-hill but not backing up at this moment and the third being time and material on jetting the existing 8� sewer lines. 1)	The first estimate is to replace 120� of the exposed 8�concrete main sewer and 82� of the 8� concrete building sewer that wyes into the previously mentioned main sewer. We will replace all previously mentioned pipe with new 8� PVC Schedule 40. This will be all glued pipe with fittings and one clean out on the main trunk and the other located ~1� outside the west end of the south building. We will supply a street safe cast iron cover so that the clean out will be safe from vehicles driving over the plastic pipe. We will have to rent a walk-behind asphalt saw to cut and remove the asphalt above the sewer line that will be replaced. We will bed the pipe with 2� of pea gravel along all sections of new PVC pipe (~202� pipe). We are not going to be getting pea gravel delivered from an outside source. We will be using pea gravel provided to us from the customer. Areas unaffected by the roadway will be restored to rough grade. We will restore ground that was previously asphalted to rough grade. This estimate is line itemized below for convenience and does not include the cold or hot asphalt patches.  We will have 50 extra yards of fill due to the 2� of pea gravel and the excess fill will remain on site and be out of the way roughly graded: Below is the itemized amount for Estimate #1:�	4 days and 2 guys labor -$13,600.00�	All parts for Estimate #1 $4,204.68�	4-day in-house excavator rental $800.00�	Walk Behind Asphalt Saw Rental $500.00�	1 Laborer for 2 days $1200.00�	Disposal of Asphalt and ~202 ft. 8� concrete pipe $900.00�	3 yards 3/8� gravel to replace existing asphalt surface $250.00The grand total for estimate #1 would come out to $21,454.68 + tax2)	Estimate to replace 30� of 4� pipe that is back graded and holding sewage due to insufficient grade. We will cap off existing line downstream and plumb in new 4� PVC line with a new tap into the 8� concrete. That fitting would also be PVC with Concrete x Plastic Fernco�s. We will supply a street safe cast iron cover so that the clean out will be safe from vehicles driving over the plastic pipe. The pipe shall be bedded with 2� of pea gravel. We estimate the labor to be one day at $3400.00, the in-house rental of $200.00, 3 yards 3/8� gravel for surface at $250.00, and parts at $374.90. The sum for this project is $4,474.90 plus tax. ***Note- Roto-Rooter is not charging for pea gravel (as pea gravel will be supplied by Customer), the asphalt walk-behind saw rental, or the compactor to restore to rough grade. We will have this equipment and material onsite when doing the other estimate. If Estimate #2 is done at a different date from Estimate #1 there will be additional charges for the listed equipment and material and would void current bid. We would need to resubmit a new estimate.  3)	The third and final option would be time and material on hydro-jetting the 8� main sewer and building sewer making repairs to the connections with plastic fittings. This would be $576.00 travel for 2 guys every day, $490.00 for the 1st hour of jetting (2 man), $220.00 each additional &amp;#189; hour of jetting (2 man), plus parts to close up 8� concrete sewer (~$500.00). We don�t recommend this option because it could take days to clear the muck and roots from the line and the line most likely will still be compromised and needing replaced.   **We do have several options for replacing the drivable surface needing replaced that can include putting 3/8� gravel on rough grade (this has been included on both bids) so it can be driven on, we can make a cold asphalt patch ~16 sq./ft. at completion, or a cold asphalt patch ~$16 sq./ft. at completion and then return in the spring to make a hot asphalt patch in the spring of 2018 when the asphalt plants have reopened ~$16 sq./ft. If you would like exact totals (labor, parts, material, delivery) on the patch work please let me know.**If estimates #1 and #2 are both accepted and can be done concurrently, we will deduct the original $2,500.00 inspection and diagnostic bill from the subtotals of Estimates #1 and #2 which would be $25,929.58 minus the $2,500 for a subtotal of $22,889.58 + tax. This is a revision that removed the 2 delivered loads of pea gravel from the estimates. The grand total will be in the amount of $24,652.08 after the discount tax included.Best Regards,Lynn MalloryRoto-RooterOperations Manager6214 E. Alki Ave.Spokane Valley, WA 99212(509)484-6937 Office(509)482-3442 Faxlynn.mallory@rrsc.com</text_data><comment_date>2017-11-07T00:00:00</comment_date></row><row _id="row-4nn5.94aj_9r8a" _uuid="00000000-0000-0000-BABE-E8F2D9F0DBCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4nn5.94aj_9r8a"><intent_id>854446</intent_id><project_id>829810</project_id><text_data>Filed by Lisa Skillman</text_data><comment_date>2017-08-11T00:00:00</comment_date></row><row _id="row-9adk.8kty_y2ae" _uuid="00000000-0000-0000-49C8-F6D580C78042" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9adk.8kty_y2ae"><intent_id>630354</intent_id><project_id>735242</project_id><text_data>Installing data cables inside building.</text_data><comment_date>2014-05-19T00:00:00</comment_date></row><row _id="row-3smx~qm6z~wcze" _uuid="00000000-0000-0000-A7E2-76226E5402CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3smx~qm6z~wcze"><intent_id>853005</intent_id><project_id>829271</project_id><text_data>Farm House Building DemolitionIntent  #843584Contract   #  17-003</text_data><comment_date>2017-08-07T00:00:00</comment_date></row><row _id="row-6ypg_7f4b-hs4r" _uuid="00000000-0000-0000-8E18-3EFDDBF25D94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ypg_7f4b-hs4r"><intent_id>992602</intent_id><project_id>880363</project_id><text_data>General Labor work consists of hand work (shovel work) no power equipment or power tools. Other trucks consist of one (1) 0-8,000 gallon water truck used for distribution of water to help with compaction before paving operations.</text_data><comment_date>2019-07-17T00:00:00</comment_date></row><row _id="row-i2w6-2h6n_z8y4" _uuid="00000000-0000-0000-5705-EEEB9196F16D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2w6-2h6n_z8y4"><intent_id>510647</intent_id><project_id>684786</project_id><text_data>Our part of the project was the removal of 4 inches of sod to allow for placement of concrete sidewalks. We removed approx. 50 square yards of sod, then poured concrete sidewalks from Desmet to the bathroom in the park. There was no large scale trenching on our part, just the locating and sleeving of some irrigation lines that were about 8 inches under the sod. After the sod was out and the forms set, I poured the sidewalks in two separate pours, 1 7 yard pour and 1 10 yard pour. I self perform almost everything, I alone operated the machinery to remove the sod. I had a ground man to check my grades. I alone set the forms. AM Landshaper placed the topsoil. I was not on site for all of the top soil work. Thank you.</text_data><comment_date>2012-05-10T00:00:00</comment_date></row><row _id="row-jm3b~kfsc_39ei" _uuid="00000000-0000-0000-B125-ACCFCBC09B6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jm3b~kfsc_39ei"><intent_id>538219</intent_id><project_id>697259</project_id><text_data>TGLC has hired an arbor sub (Davey Tree)to complete the arbor work on this job; deep root fertilizer.  TGLC will complete the plant material removal and install cobble and sod.</text_data><comment_date>2012-10-04T00:00:00</comment_date></row><row _id="row-r7dz~ge7q_juv7" _uuid="00000000-0000-0000-3786-D80DF792DCF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r7dz~ge7q_juv7"><intent_id>641786</intent_id><project_id>735961</project_id><text_data>Form filed by: Sue Heidemann</text_data><comment_date>2014-07-17T00:00:00</comment_date></row><row _id="row-2qit_xhdi~yfkk" _uuid="00000000-0000-0000-443A-8DD7DFFB5477" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2qit_xhdi~yfkk"><intent_id>598090</intent_id><project_id>721520</project_id><text_data>***This form is being approved on the basis of your statement that your contracted work is not covered under the prevailing wage statutes and rules per the provisions under SB 5538. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-10-09T00:00:00</comment_date></row><row _id="row-s9m3.5cz2~zwg2" _uuid="00000000-0000-0000-1F4C-72587802D267" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s9m3.5cz2~zwg2"><intent_id>974261</intent_id><project_id>877147</project_id><text_data>FILED BY KIM BURNSIDE</text_data><comment_date>2019-04-26T00:00:00</comment_date></row><row _id="row-pid6-we79-btfq" _uuid="00000000-0000-0000-F057-57FDABA0FB04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pid6-we79-btfq"><intent_id>1192830</intent_id><project_id>987737</project_id><text_data>#1 � Installation of Ductless Heat Pump System. #2 � Single Family #3 � 1 Story #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (I) No (j) No (k) No (l) Other? #5 � Yes #6 Yes #7 � No #8 - No</text_data><comment_date>2021-11-11T00:00:00</comment_date></row><row _id="row-7bjn_vkmq-8y8v" _uuid="00000000-0000-0000-1BC6-B21B25B2E742" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7bjn_vkmq-8y8v"><intent_id>1249890</intent_id><project_id>1017310</project_id><text_data>122681-001</text_data><comment_date>2022-07-18T00:00:00</comment_date></row><row _id="row-v22u.5gps-nvk8" _uuid="00000000-0000-0000-2981-455211604282" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v22u.5gps-nvk8"><intent_id>609854</intent_id><project_id>726297</project_id><text_data>Janitorial service</text_data><comment_date>2013-12-26T00:00:00</comment_date></row><row _id="row-3drk_h5cw_j44a" _uuid="00000000-0000-0000-9A31-6E89B349F974" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3drk_h5cw_j44a"><intent_id>1263982</intent_id><project_id>1029591</project_id><text_data>12747 SA 2022 - 9898870</text_data><comment_date>2022-09-04T00:00:00</comment_date></row><row _id="row-dhcr_u2en-64t2" _uuid="00000000-0000-0000-4D8A-6498C8F332AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dhcr_u2en-64t2"><intent_id>899574</intent_id><project_id>848740</project_id><text_data>Warner. Kyle  From: Sent: To: Subject: Garcia, Tonia (LNI) &amp;lt;gato235@LNI.WA.GOV&amp;gt; Monday, December  29, 2014 9:51 AM Warner, KyleRE: Correction Notice Response (Contract#  SW 14-051 Kyle,Thank you for the information you have provided. Your form is now approved. If you choose to continue to file on paper (or online) I suggest you include this information on the work of your General Laborer as the question will always beasked. Thanks again!Tonia GarciaCustomer Service Specialist Prevailing WagePO Box44540Olympia, Wa 98504-4540360.902.4290-  phone360.902.5300 - faxTonia.Garcia@Lni.wa.govToll free 866 219-7321Prevailing Wage Information :http:lj     www.lni.wa.gov/Tradeslicensing/PrevWage/defauIt.asp**Answers contained in this e-mail are based on the facts you prov ided. If the facts differ from those you provided, the answers may be dif fe re nt .**From: Warner,  Kyle [mailto:Kyle.Warner@camfil.com]Sent: Monday, December  29,  2014 7:57 AMTo: Garcia, Tonia (LNI)Subject:  Correction  Notice Response (Contract#  SW 14-051Tonia,Good Morning my name is Kyle Warner with Camfil USA. On December 22nd I submitted an intent form for contract# SW 14-051 with the Battle Ground School District. It  appears that there is a bit  more information needed regarding the  scope of work being performed by the general laborers.Please refer to previous intent (512615) and contract# (SW 11-026) with Battle Ground School District to help understand the history of Camfil&amp;#39;s work with the Battle Ground School District. Camfil was classified under the general laborers for contract# (SW 11-026) and the new contract (SW 14 -051 ) is the exact same scope of work, but the new awarded contract. Please see below answers to  help complete the new intent form,**********(1) Please enter the number of Owner/Operators who will be working on this project. If they do not own 30% or more then you wi/1 need to list their trade under the Craft/trade section. *********{2} In order to finish processing your form, we need more information. A) Please describe the whole project. CJ Please specifically describe the duties being performed by the General Laborer and list any tools, equipment, or vehicles used. Thank you1.	There are zero owners/operators performing work on this project.a.	There are no owner/operators performing work on this project.2.a.  The scope of the project for contract# (SW 11 -026) includes the removal of a used air filter from its compartment and the installation of a new air filter in the intended compartment for every school and filter compartment district wide. The only work that is performed is removal and installation of air filters. There is absolutely no mechanical, maintenance, tune ups or any other preventative work done to any equipment. Camfil doesn&amp;#39;t touch any electrical components, motors, belts or any power operated aspect of any equipment.b.c.	The duties performed and tools used by the general laborer while removing and installing air filters from a compartment  are the following,i.	Screw driver:1.	To remove or fasten any screws that help secure the filters or compartment.ii.	Ladder:1.	To help access any compartments that require a ladder.iii.	Hand Truck:1.	To transport filter boxes to and from the intended installation and removal site.iv.	Van:1.	The General Laborers use Camfil issued vans that transport the air filters and laborer from Camfil office to intended job site.I have also attached an acceptance letter for a general laborers jobs for the Evergreen School District intent# 562123. Though a different school district, the job description and requirements were the same and both school districts reside in Clark County. Removal and installation of air filters from the intended compartment with no other tasks involved, including no adjustments, tune-ups, etc. Again, I thank you for your time and if you have any questions please contact me.Thank you, Kyle WarnerKyle Warner I Portland Branch Territory Sales Manager Camfil USA, Inc.5365 SE International Way, Milwaukie, OR 97222Phone: +1 (503) 233-5101Mobile:  +1 (503-) 688-0619Fax: +1 (503) 236-8785Email: kyle.warner@camfil.comWeb address: www.camfil.uscamfilCLEAN  AIR SOLUTIONS From: Selover, Ann (LNI) [mailto:sela235@LNI.WA.GOV]Sent: Tuesday, July 10, 2012 12:23 PMTo: Millington, DanCc: Christensen-Russell, Ramona (LNI); Ehrlander, Marcus (LNI)Subject: RE: New bid - Evergreen prevailing wage inquiry for air filter changeDan,Provided the work you would be performing for Evergreen School District is identical to the work previously described: removing out of its compartment a used air filter and inserting a new filter, with no other tasks involved, including no ad&amp;#183;  ustments, tune-ups, etc., the work may be performed at the Laborers (WAC 296-127-01344) wage rate. You could also use the Sheet Metal Worker (WAC 296-127-01372) or Heating Equipment Mechanic (WAC 296-127-01333) rates, depending on the type of equipment, etc., consistent with Ms. Christensen&amp;#39;s prior direction.Also, a reminder that the prevailing rate of wage for the Building Service Employee is not correct for such work.Good luck with your bid. Ann...&amp;#163;.	cf&amp;#39;Industrial Statistician/Program Manager Prevailing WageDepartment of Labor and Industries (360) 902-5330sela235@Lni.wa.gov</text_data><comment_date>2018-04-19T00:00:00</comment_date></row><row _id="row-yyhe~ht5p~rgep" _uuid="00000000-0000-0000-F8B1-ACAAA5FFE70C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yyhe~ht5p~rgep"><intent_id>492269</intent_id><project_id>678677</project_id><text_data>Residential project The facility is townhomes.  The townhomes are 3 stories.  The facility is used as affordable housing.  Each unit has it own small kitchen. Each unit has it's own bathroom. There is no manager's office on site. No part of the facility is used for the public. Residential Master Tradesman fringe benefit package is $18.30Health &amp; Welfare $7.85, Pension $9.95 Apprenticship $.50</text_data><comment_date>2011-12-06T00:00:00</comment_date></row><row _id="row-9fwb_ynfd~jghp" _uuid="00000000-0000-0000-5311-C3567D035F21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9fwb_ynfd~jghp"><intent_id>840627</intent_id><project_id>822756</project_id><text_data>Scope of work includes landscape and irrigation repairs.</text_data><comment_date>2017-06-14T00:00:00</comment_date></row><row _id="row-5zjb~4k97~fjh2" _uuid="00000000-0000-0000-AD38-BDD960D7C1CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5zjb~4k97~fjh2"><intent_id>1217791</intent_id><project_id>990926</project_id><text_data>S031563</text_data><comment_date>2022-03-15T00:00:00</comment_date></row><row _id="row-gtn4.3j2g_qpph" _uuid="00000000-0000-0000-2E21-65E8A0273683" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gtn4.3j2g_qpph"><intent_id>1004301</intent_id><project_id>881477</project_id><text_data>MMFS Job#73192599</text_data><comment_date>2019-09-03T00:00:00</comment_date></row><row _id="row-9s7b-qvhg-eptv" _uuid="00000000-0000-0000-EBBC-0802C28922E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9s7b-qvhg-eptv"><intent_id>497268</intent_id><project_id>372935</project_id><text_data>FRINGE RATE:ANNUITY:  4.00PENSION:  8.95H &amp; W:    6.02IMPACT:    .25APPR:      .63IND:       .01TOTAL:   19.86</text_data><comment_date>2012-01-17T00:00:00</comment_date></row><row _id="row-pd35_i38n_5jxa" _uuid="00000000-0000-0000-86DC-405C10271159" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pd35_i38n_5jxa"><intent_id>1089618</intent_id><project_id>932604</project_id><text_data>Project# 02474, Johnson, Lacey, 2515 W Francis, Spokane, WA 99205</text_data><comment_date>2020-09-21T00:00:00</comment_date></row><row _id="row-pjb7-9um9~u9jw" _uuid="00000000-0000-0000-156F-39B47FA8E3F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjb7-9um9~u9jw"><intent_id>688746</intent_id><project_id>759821</project_id><text_data>This is for 27 new schools that are being completed in the Tacoma area.</text_data><comment_date>2015-04-13T00:00:00</comment_date></row><row _id="row-ev6y~afzu-qm5m" _uuid="00000000-0000-0000-127F-2C19C41BC2F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ev6y~afzu-qm5m"><intent_id>559858</intent_id><project_id>704150</project_id><text_data>Filed By Audrius Vastakas</text_data><comment_date>2013-03-13T00:00:00</comment_date></row><row _id="row-hj6t~68bx~fp38" _uuid="00000000-0000-0000-829C-C94D15F844AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hj6t~68bx~fp38"><intent_id>830079</intent_id><project_id>819539</project_id><text_data>Filed by Andrew Ryan</text_data><comment_date>2017-05-01T00:00:00</comment_date></row><row _id="row-theq.mhz4.k3fp" _uuid="00000000-0000-0000-6DAF-7CC5EBDA312D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-theq.mhz4.k3fp"><intent_id>1046396</intent_id><project_id>913011</project_id><text_data>WRI Job # 20.003</text_data><comment_date>2020-03-19T00:00:00</comment_date></row><row _id="row-xqsj.wuch.xkfx" _uuid="00000000-0000-0000-8D29-FFEB3D09C97E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xqsj.wuch.xkfx"><intent_id>885721</intent_id><project_id>833579</project_id><text_data>1.	Install Panosonic bath fan with smart switch. 2. Single Family. 3. Single story. 4a. no. 4b. no. 4c. yes. 4d. no. 4e. no 4f. no 4g. no 4h. no. 4i. no 4j. no 4k. no. i. na. 5. yes. 6. yes. 7. no. 8. NoShirley Murzi 23708 Locust WayBothell WA 98021</text_data><comment_date>2018-01-30T00:00:00</comment_date></row><row _id="row-grx8-rzj2-a4jm" _uuid="00000000-0000-0000-F699-CE1DC1F01CA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-grx8-rzj2-a4jm"><intent_id>565018</intent_id><project_id>709025</project_id><text_data>Answer #1 Work description. Remove &amp; dispose fire damaged items from exterior. Replace vapor barrier on one side of patio, above patio door &amp; as needed. Replace vinyl patio sliding glass door. Replace vinyl siding on west wall above patio Replace exterior 1/2 inch plywood siding on west wall 1.5 sheetpatio door &amp; parts of the partition. Replace vinyl corners and J molding. Replace or prime and paint soffit area. Replace 4 inch exhaust dryer vent. Replace patio light using similar fixture (replace wiring if needed). Replace 12 feet continuous gutter &amp; vinyl downspouts &amp; connections. Replace damaged 3 tab roofing.  4-5 pieces. Answer #2 Structure is a single family apartment. Answer #3 Structure has two stories. Answer #4 Structure is being used as a single family residence. Answer #4(a) No commercial use in the structure. Answer #4(b) No retail use in the structure. Answer #4(c) Permanent residence only. Answer #(d) Not a rehabilitation house. Answer 4(e) Not transitional housing. Answer #4(f) No communal dining facility. Answer #4(g) No treatment services. Answer #4(h) No dormitories Answer #4(i) No counseling. Answer #4(j) Each room or bed is not rented separately. Answer #5 Each dwelling unit has its own contained kitchen. Answer #6 Each dwelling unit has its own bathroom. Answer #7 There ia a community facility or manager's office onsite. Answer #8 No part of the structure is used by members of the public.d.</text_data><comment_date>2013-04-23T00:00:00</comment_date></row><row _id="row-x2ez.rtca.kmnc" _uuid="00000000-0000-0000-4048-D228B49347EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x2ez.rtca.kmnc"><intent_id>569865</intent_id><project_id>698075</project_id><text_data>FSW#3-17-8201</text_data><comment_date>2013-05-15T00:00:00</comment_date></row><row _id="row-z3vf_bv9r_sdhu" _uuid="00000000-0000-0000-FF55-C3E468CC3FFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3vf_bv9r_sdhu"><intent_id>694102</intent_id><project_id>743044</project_id><text_data>5/12/2015 Notified to file Intent &amp; Affidavit with Certified Payrolls</text_data><comment_date>2015-05-12T00:00:00</comment_date></row><row _id="row-evdy~kvrr~ce7s" _uuid="00000000-0000-0000-ADC2-8D335017E05F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-evdy~kvrr~ce7s"><intent_id>970637</intent_id><project_id>878018</project_id><text_data>FILED BY HUGO CESAR BONILLA ESPINOSA</text_data><comment_date>2019-04-10T00:00:00</comment_date></row><row _id="row-w747.spgu-jpmf" _uuid="00000000-0000-0000-05BB-96B2314D3F5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w747.spgu-jpmf"><intent_id>1257457</intent_id><project_id>1007169</project_id><text_data>shamrock job# 26412trucks - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2022-08-11T00:00:00</comment_date></row><row _id="row-hkew-jnv9~u64z" _uuid="00000000-0000-0000-7F50-7867174692CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hkew-jnv9~u64z"><intent_id>919222</intent_id><project_id>855273</project_id><text_data>Granite job# 812693TRUCKSlowboy delivers asphalt rotomill to jobsitesweeper driven to jobsite</text_data><comment_date>2018-07-18T00:00:00</comment_date></row><row _id="row-8z8z-yhhv_ddfw" _uuid="00000000-0000-0000-F665-4A586FDF2A67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8z8z-yhhv_ddfw"><intent_id>1014492</intent_id><project_id>895816</project_id><comment_date>2019-10-10T00:00:00</comment_date></row><row _id="row-ixuz.v24x.k58e" _uuid="00000000-0000-0000-410C-3542A289D9B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ixuz.v24x.k58e"><intent_id>994908</intent_id><project_id>878533</project_id><text_data>Our duties for this project were to bring playground material in our truck to the facility where everything was marked and ready for the Swanson employee and additional hired subcontractor (landscape construction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used. Truck = KENWORTH T-800 4 axle Trailer = IMCO live floor trailer 48� This truck was used to deliver Engineered Wood Fiber (a type of Playground Chip). Material was delivered using our blower trailer to blow material into designated areas specified by the Prime Contractor. We hired a subcontractor to complete the landscape construction portion, to take a hose and blow the product on the playground where they told us. No other tools, etc. are used.</text_data><comment_date>2019-07-26T00:00:00</comment_date></row><row _id="row-abpx~bxpw~6ymi" _uuid="00000000-0000-0000-B6F6-2DC00D952273" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-abpx~bxpw~6ymi"><intent_id>1023263</intent_id><project_id>900250</project_id><text_data>Low voltage cable installation and repair, assist with wifi issues at various locations.</text_data><comment_date>2019-12-19T00:00:00</comment_date></row><row _id="row-p7a5-8ra5.jx37" _uuid="00000000-0000-0000-DE97-F8D6FCA3F151" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7a5-8ra5.jx37"><intent_id>590366</intent_id><project_id>713139</project_id><text_data>Pivetta Bros hired us</text_data><comment_date>2013-08-28T00:00:00</comment_date></row><row _id="row-z67p_z425_wyvw" _uuid="00000000-0000-0000-71BE-D3B93AA311E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z67p_z425_wyvw"><intent_id>587037</intent_id><project_id>699190</project_id><text_data>Filed by Rachael Hutchinson.</text_data><comment_date>2013-08-12T00:00:00</comment_date></row><row _id="row-udb2.vajb-i9pw" _uuid="00000000-0000-0000-E6DF-69E638554F14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-udb2.vajb-i9pw"><intent_id>593131</intent_id><project_id>685176</project_id><text_data>Electricians � Inside:Health: $7.45Pension: $9.46Training: $0.58Total: $17.49</text_data><comment_date>2013-09-11T00:00:00</comment_date></row><row _id="row-efs6-8age~m2va" _uuid="00000000-0000-0000-3A33-6EBEDD7565BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efs6-8age~m2va"><intent_id>1134976</intent_id><project_id>957706</project_id><text_data>May not have any TRS employees working on this job (may only be subcontractors)</text_data><comment_date>2021-04-09T00:00:00</comment_date></row><row _id="row-iesa_92tb.42e9" _uuid="00000000-0000-0000-55DE-927AE0B9F7E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iesa_92tb.42e9"><intent_id>840722</intent_id><project_id>824446</project_id><text_data>Job 17CPW CP0182</text_data><comment_date>2017-06-14T00:00:00</comment_date></row><row _id="row-ws78_n2qm-mu6x" _uuid="00000000-0000-0000-8440-970DFFEBBF54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ws78_n2qm-mu6x"><intent_id>700427</intent_id><project_id>764748</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-06-12T00:00:00</comment_date></row><row _id="row-i5u4.4gzs-2h4z" _uuid="00000000-0000-0000-D595-A64CAA867A39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i5u4.4gzs-2h4z"><intent_id>801754</intent_id><project_id>807397</project_id><text_data>WO #8018865</text_data><comment_date>2016-11-16T00:00:00</comment_date></row><row _id="row-jznd-7ckf-vpjk" _uuid="00000000-0000-0000-8477-8C4C43C9C284" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jznd-7ckf-vpjk"><intent_id>611044</intent_id><project_id>684220</project_id><text_data>THIS INTENT IS BEING FILED TO REPLACE ID#564336 WHICH WAS FILED W/INCORRECT HIRING CONTRACTOR.  ONCE THIS NEW INTENT IS APPROVED, PLEASE DELETE INTENT# 564336.</text_data><comment_date>2014-01-07T00:00:00</comment_date></row><row _id="row-x928.yvsb_kkvg" _uuid="00000000-0000-0000-8ADF-205B87BCFDBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x928.yvsb_kkvg"><intent_id>581177</intent_id><project_id>714931</project_id><text_data>General Laborer: Hand shovelOther Trucks: Lowboy &amp; Water truck</text_data><comment_date>2013-07-15T00:00:00</comment_date></row><row _id="row-h2rv~z4b3-qbni" _uuid="00000000-0000-0000-0E6A-734103C20D07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2rv~z4b3-qbni"><intent_id>901894</intent_id><project_id>760125</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on-call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2018-05-16T00:00:00</comment_date></row><row _id="row-barp.dgmg.kab2" _uuid="00000000-0000-0000-AE7B-6C21A598FC13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-barp.dgmg.kab2"><intent_id>719180</intent_id><project_id>771768</project_id><text_data>Other Truck is 4,000 gallon water truck used for dust control and compaction</text_data><comment_date>2015-09-04T00:00:00</comment_date></row><row _id="row-xc74-tvxz-urdz" _uuid="00000000-0000-0000-F452-6C0D29E5E42D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xc74-tvxz-urdz"><intent_id>586403</intent_id><project_id>717324</project_id><text_data>Work to be performed at the following locations:  904, 915, 925, 1000, &amp; 1030 8th Street, Kirkland, 98033;  310 1st Street, Kirkland, 98033;  123 5th Avenue, Kirkland, 98033;  350, 352, &amp; 406 Kirkland Ave, Kirkland, 98033; 12421 103rd Ave NE Kirkland, 98033;  11515 NE 118th Street, Kirkland, 98033</text_data><comment_date>2013-08-08T00:00:00</comment_date></row><row _id="row-7zsz-gcy2.zdnh" _uuid="00000000-0000-0000-1EF6-7B8D1BABFF85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zsz-gcy2.zdnh"><intent_id>1038864</intent_id><project_id>904696</project_id><text_data>JW, NEBF $1.63, H&amp;W $9.40, Pension $9.38, 401K $2.00, JATC $0.68.</text_data><comment_date>2020-02-17T00:00:00</comment_date></row><row _id="row-awms~9kqc-evi6" _uuid="00000000-0000-0000-AD06-C27EFFD0D5E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-awms~9kqc-evi6"><intent_id>551709</intent_id><project_id>702959</project_id><text_data>Awarding agency is correct per Jerry Giese at Clark County</text_data><comment_date>2013-01-15T00:00:00</comment_date></row><row _id="row-n7cs_pdg6_jaxv" _uuid="00000000-0000-0000-97BA-D6BFE423BD37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n7cs_pdg6_jaxv"><intent_id>504931</intent_id><project_id>682697</project_id><text_data>General Laborere - use of shovel and clean up work</text_data><comment_date>2012-03-22T00:00:00</comment_date></row><row _id="row-fy6b_eut5-t49b" _uuid="00000000-0000-0000-0676-610DE0268D27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fy6b_eut5-t49b"><intent_id>865555</intent_id><project_id>810555</project_id><text_data># 22383</text_data><comment_date>2017-09-27T00:00:00</comment_date></row><row _id="row-ysrb.c42t_8mu2" _uuid="00000000-0000-0000-BDBA-E78F613C63C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ysrb.c42t_8mu2"><intent_id>914382</intent_id><project_id>854453</project_id><text_data>General Laborer consists of hand work only (no power tools or equipment) $30.53 base + $7.63 pensionBlade Operator is used for grading the project before paving or chip sealing operations $34.03 base + $8.76 pensionOther trucks consists of the following:1) 0 to 8,000 gallon water truck is used to help with compaction and dust control $35.47 base + $8.87 pension2) Oil distributor is used for chip sealing operations $35.47 base + $8.87 pension</text_data><comment_date>2018-06-27T00:00:00</comment_date></row><row _id="row-ret8_2d2c.aqmu" _uuid="00000000-0000-0000-E4AE-C64273A99159" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ret8_2d2c.aqmu"><intent_id>566411</intent_id><project_id>689324</project_id><text_data>The overall project consists of construction of a new 66,000 square foot two story Community Resource Center / Office Building facility to be built just south of Memorial Stadium in Everett WA. Construction is scheduled to be completed in fall of 2013. Total Grounds Management�s scope of work includes: Installation of Landscape, irrigation trenches no greater than 18� below finished grade, import soils to depths no greater than 6� below finished grade in lawn and garden areas, import and placement of boulders, trees, shrubs, groundcovers, staking, tying, fertilizing, 1-year  maintenance through owner acceptance.In addition to wheelbarrows, hand tools, mowers, etc, typical equipment includes a Bobcat, Mini Excavator, and Front Loader all with less than ninety horsepower power rating.Total Grounds Management�s scope of work excludes:Water meter, setter or stub for irrigation POC, power to controller, sleeving into building for controller, surveying, locate, Subgrade work, Cut, patch of asphalt, site concrete work, concrete edging, curbing, traffic control, erosion control, tree protection of existing trees, Boring, jacking, lifting, hoisting. Additionally, TGM�s work excludes any activity or task (including those mentioned above) when performed preparatory to any non-landscaping construction work; constructing roads, footpaths, trails or rock walls more than four feet high; custom fabrication of trellis work, play equipment, benches or picnic tables; constructing restrooms, shelters or similar structures; installing sewer systems, storm sewer systems, catch basins, vaults or drainage systems for impervious surfaces (such as parking lots); installing drainage systems or underground sprinkler systems more than three feet below final grade; land clearing, dozing, grading, excavating or hauling except as permitted above; tree falling or bucking; sub-grade preparation; the use of power equipment with more than ninety horsepower; the use of trucks with more than one rear axle except hydroseeders; demolition of structures; asphalt or concrete work</text_data><comment_date>2013-05-23T00:00:00</comment_date></row><row _id="row-acj5-mzzz~f2ih" _uuid="00000000-0000-0000-33B4-06E349A95221" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-acj5-mzzz~f2ih"><intent_id>1002798</intent_id><project_id>891478</project_id><comment_date>2019-09-23T00:00:00</comment_date></row><row _id="row-ivy2_9ewf_gmjb" _uuid="00000000-0000-0000-C6A6-EA081447B5E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ivy2_9ewf_gmjb"><intent_id>529598</intent_id><project_id>693281</project_id><text_data>Repair broken sprinkler systems, install new irrigation  with 2&amp;quot; and smaller pipe.  Ditches to be 15-18&amp;quot; deep.  Topsoil to be installed to 6&amp;quot; deep by subcontractor.  Plants &amp; tress to be installed in planters by means of shovels, picks.  Bark to be installed by wheelbarrows to a depth of 2&amp;quot;</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-jgyu-8892.bmwr" _uuid="00000000-0000-0000-B9F4-6CD18A9E78AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgyu-8892.bmwr"><intent_id>775427</intent_id><project_id>785660</project_id><text_data>DEI Job 15298</text_data><comment_date>2016-07-18T00:00:00</comment_date></row><row _id="row-suk7_7px3-xjrq" _uuid="00000000-0000-0000-E575-18A3C94C3A17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-suk7_7px3-xjrq"><intent_id>544131</intent_id><project_id>699564</project_id><text_data>Installation of NEP irrigation system (less than 2� depth) to include:  hand spades, shovels, rakes, pliers, poly pipe cutters, buckets, and wheelbarrow.</text_data><comment_date>2012-11-12T00:00:00</comment_date></row><row _id="row-5jyj_izcj~hpmk" _uuid="00000000-0000-0000-BC5E-888FFDC97A03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5jyj_izcj~hpmk"><intent_id>1281433</intent_id><project_id>1039569</project_id><text_data>Estimate 24463$1806.75</text_data><comment_date>2022-11-04T00:00:00</comment_date></row><row _id="row-7x6s.xey7~hgb4" _uuid="00000000-0000-0000-86FD-89800EABBA8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7x6s.xey7~hgb4"><intent_id>860858</intent_id><project_id>831865</project_id><text_data>Job #112834-002</text_data><comment_date>2017-09-06T00:00:00</comment_date></row><row _id="row-pih4-46qu~9qt3" _uuid="00000000-0000-0000-849E-1B4BD9EF7D3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pih4-46qu~9qt3"><intent_id>878312</intent_id><project_id>813622</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2017-12-08T00:00:00</comment_date></row><row _id="row-i87d.hfjd~q2jw" _uuid="00000000-0000-0000-96AC-7F4DC7EC5CA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i87d.hfjd~q2jw"><intent_id>789692</intent_id><project_id>800979</project_id><text_data>There was a fire in the Puyallup School District Bus Barn and Trades Labor employees performed clean-up.</text_data><comment_date>2016-09-15T00:00:00</comment_date></row><row _id="row-p4tm_98ye-ebap" _uuid="00000000-0000-0000-A412-CC3D327931A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4tm_98ye-ebap"><intent_id>926678</intent_id><project_id>859131</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project? Examples are:  Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc.  This is a lighting retrofit installation.   We work with Clark PUD customers to recommend retrofit light products, process rebate paperwork and we are selling them light fixtures and lamps that will be retrofitted into existing fixtures throughout buildings and exterior by either volunteers, maintenance staff or electricians.2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See  WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)].  No.3. Does this specific project entail the remodeling or new construction of a facility?  No.4. If your firm is working upon a type of building system, what type of system is involved?  Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.  Lights only.  All four projects are mostly interior lighting (troffers retro kits, lamps, downlights and surface mounts) with some exterior wallpacks and pole lights.  5. What specific tasks will your employees perform? Lighting design, ordering and delivery of lighting products, processing of rebate documents, customer service and warranty.6. What, if any, tools will your employees use in the performance of those tasks?  Computers for paperwork, and trucks for delivery.7. If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?   No.8. Are you going to be hiring any subcontractors for this project?  Possibly the customers may hire electrical contractors, some churches are using volunteer labor.9. When is your work to be completed? Planning or preconstruction phase or during the public works project?  Most projects should be done in 3 months, depending on fixture delivery times which can be</text_data><comment_date>2018-09-06T00:00:00</comment_date></row><row _id="row-g6z4_vkyi.anm3" _uuid="00000000-0000-0000-D186-77195B3ED664" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g6z4_vkyi.anm3"><intent_id>623692</intent_id><project_id>732495</project_id><text_data>Janitorial services provided.</text_data><comment_date>2014-04-07T00:00:00</comment_date></row><row _id="row-ziey~vb4b_kfae" _uuid="00000000-0000-0000-E76F-2D07BF72C598" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ziey~vb4b_kfae"><intent_id>621223</intent_id><project_id>696764</project_id><text_data>1) Install Gutters, 2) Apartment, 3) 2 , 4) Low Income Housing, A-no, B-no, C-Yes, D-no,E-no,F-no,G-no,H-no,I-no,J-no, K-NA, 5)yes, 6) yes, 7) yes, 8) no</text_data><comment_date>2014-03-20T00:00:00</comment_date></row><row _id="row-6zhs-eukt-qwp4" _uuid="00000000-0000-0000-E083-20FADF08DB8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6zhs-eukt-qwp4"><intent_id>555000</intent_id><project_id>704361</project_id><text_data>1502 E Yesler WaySeattle, 98122</text_data><comment_date>2013-02-06T00:00:00</comment_date></row><row _id="row-vm62-p8fy~cwme" _uuid="00000000-0000-0000-666F-9B7AFF21F749" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vm62-p8fy~cwme"><intent_id>775807</intent_id><project_id>797329</project_id><text_data>Extend Underground electrical service, create gravel pad for portable building. no water system. Construct sidewalks from pad to existing asphalt play area, restore lawn adjacent to pad and sidewalks. Top soil 4&amp;quot;-6&amp;quot; depthspread topsoil, seed for restoration along sidewalks. Tools: backhoe, wheelbarrow, shovels, rakes</text_data><comment_date>2016-07-19T00:00:00</comment_date></row><row _id="row-grgu.qu74~eaj7" _uuid="00000000-0000-0000-CF29-469BCE0204CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-grgu.qu74~eaj7"><intent_id>757453</intent_id><project_id>789936</project_id><text_data>We perform basic landscape maintenance duties(Mowing, weeding, and pruning).  We use lawn mowers, weed eaters, blowers, and various manual hand tools.</text_data><comment_date>2016-04-19T00:00:00</comment_date></row><row _id="row-59kp~wgzf_gw5z" _uuid="00000000-0000-0000-B935-B58EF2176829" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-59kp~wgzf_gw5z"><intent_id>933420</intent_id><project_id>845519</project_id><text_data>32374</text_data><comment_date>2018-09-17T00:00:00</comment_date></row><row _id="row-997r_uytk~24t4" _uuid="00000000-0000-0000-2C79-F972D354E9DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-997r_uytk~24t4"><intent_id>849703</intent_id><project_id>828035</project_id><text_data>Homeless encampment clean up of bio waste, medical waste, human excrement, debris and garbage</text_data><comment_date>2017-07-24T00:00:00</comment_date></row><row _id="row-f5bp-ewzh-2ps9" _uuid="00000000-0000-0000-5D41-3F6C3979EEC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f5bp-ewzh-2ps9"><intent_id>814373</intent_id><project_id>795487</project_id><text_data>027007</text_data><comment_date>2017-02-03T00:00:00</comment_date></row><row _id="row-h76j.7h8e-8kze" _uuid="00000000-0000-0000-C507-44C49321F64F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h76j.7h8e-8kze"><intent_id>723510</intent_id><project_id>773550</project_id><text_data>Workers Keith Burrell and Mike Poe 1.Weatherization 2.SFD 3.one 4a,b,no c,yesd,e,f,g,h,i,j,no 5,6,yes 7,8,no</text_data><comment_date>2015-09-29T00:00:00</comment_date></row><row _id="row-gqy4~m4xb~fqzg" _uuid="00000000-0000-0000-8DFA-5F8897F8AD12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqy4~m4xb~fqzg"><intent_id>522895</intent_id><project_id>691809</project_id><text_data>dug out dirt away from the foundation and waterproofed the wall. Put dirt back</text_data><comment_date>2012-07-23T00:00:00</comment_date></row><row _id="row-s4ad~gpu2~9nji" _uuid="00000000-0000-0000-0F94-0425679E132F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4ad~gpu2~9nji"><intent_id>750136</intent_id><project_id>786677</project_id><text_data>Port of Everett JOC - AD-GN-2014-5.2.000 - WO# MR-GN-2016-02.000</text_data><comment_date>2016-03-07T00:00:00</comment_date></row><row _id="row-gwxj.c66e~gsxp" _uuid="00000000-0000-0000-420C-28F2DD711A4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gwxj.c66e~gsxp"><intent_id>807113</intent_id><project_id>809339</project_id><text_data>I am responding to this correction notice for this project.This will be a brand new, ground up, 4 story building with apartments only.  There is currently a structure on the property, but that will be demolished for the new Valhalla Hall Apartments.Per my notes, there is no garage, or basement.  I hope this helps and our intent will be approved.  Thank you.</text_data><comment_date>2016-12-22T00:00:00</comment_date></row><row _id="row-va5v_mhn3_7yh9" _uuid="00000000-0000-0000-1480-62754B433767" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-va5v_mhn3_7yh9"><intent_id>571959</intent_id><project_id>711129</project_id><text_data>4509 N. 1st.- PO #382905- Project #17851148 E. Fairview- PO #383953- Project #17884</text_data><comment_date>2013-05-29T00:00:00</comment_date></row><row _id="row-6ji6.44mx~ck3v" _uuid="00000000-0000-0000-57B9-28CD88A5F74E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ji6.44mx~ck3v"><intent_id>952308</intent_id><project_id>866106</project_id><text_data>Filed by Linnie Shaver</text_data><comment_date>2018-12-26T00:00:00</comment_date></row><row _id="row-wtrc-ukc9-7enj" _uuid="00000000-0000-0000-68A4-71AED121CF75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wtrc-ukc9-7enj"><intent_id>904381</intent_id><project_id>850625</project_id><text_data>PPC Job# 18174</text_data><comment_date>2018-05-13T00:00:00</comment_date></row><row _id="row-rher-djy2-9fsp" _uuid="00000000-0000-0000-93FC-69A14CA56DDB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rher-djy2-9fsp"><intent_id>781352</intent_id><project_id>757281</project_id><text_data>302146</text_data><comment_date>2016-08-10T00:00:00</comment_date></row><row _id="row-nrkr_u235~qr4t" _uuid="00000000-0000-0000-292B-38FD68A18F43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrkr_u235~qr4t"><intent_id>880530</intent_id><project_id>839197</project_id><text_data>1 drain cleaning 2 yes 3 n/a 4 a no b no c yes d no e no f no g no h no i no j no k no 5 yes 6 yes 7 no 8 no</text_data><comment_date>2017-12-21T00:00:00</comment_date></row><row _id="row-wz5f~zavp_bbg3" _uuid="00000000-0000-0000-29F0-6DA848D9542A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wz5f~zavp_bbg3"><intent_id>486799</intent_id><project_id>663016</project_id><text_data>Heavy haul trucks hauling concrete bridge girders with steer trailers.</text_data><comment_date>2011-11-01T00:00:00</comment_date></row><row _id="row-snq6_tizf_sfce" _uuid="00000000-0000-0000-7CB7-1F0762EFA166" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-snq6_tizf_sfce"><intent_id>694103</intent_id><project_id>754234</project_id><text_data>Form filed by:  Angela D. Casida</text_data><comment_date>2015-05-12T00:00:00</comment_date></row><row _id="row-pp6j.b65e~3na5" _uuid="00000000-0000-0000-954C-8F8619E9C363" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pp6j.b65e~3na5"><intent_id>1212085</intent_id><project_id>944739</project_id><text_data>I should have said dig up a 2' caliper tree and save to replant in new location and re-landscape.  Cap and install new irrigation.</text_data><comment_date>2022-03-09T00:00:00</comment_date></row><row _id="row-eqkk-kpqk~mb34" _uuid="00000000-0000-0000-2412-EE95746E5846" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eqkk-kpqk~mb34"><intent_id>529881</intent_id><project_id>689973</project_id><text_data>Fringe Benefits - Hourly Retirement $9.65 - Hourly Vacation $4.82 - Hourly Holiday - 1.61</text_data><comment_date>2012-08-21T00:00:00</comment_date></row><row _id="row-re5r~pvvz~jzf2" _uuid="00000000-0000-0000-0A68-AEE3C53B1FEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-re5r~pvvz~jzf2"><intent_id>513477</intent_id><project_id>658035</project_id><text_data>Penhall Job # 230702Other truck :  oil dispersement truck.</text_data><comment_date>2012-05-24T00:00:00</comment_date></row><row _id="row-7gjj.k94n~sbpk" _uuid="00000000-0000-0000-79BB-0D564B5AA275" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7gjj.k94n~sbpk"><intent_id>969379</intent_id><project_id>877484</project_id><text_data>FILED BY MAUREEN OTTO</text_data><comment_date>2019-04-03T00:00:00</comment_date></row><row _id="row-byaf-hfpv-av9c" _uuid="00000000-0000-0000-41DC-F5BF72CDDC15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-byaf-hfpv-av9c"><intent_id>937920</intent_id><project_id>847772</project_id><text_data>GENERAL LABOR WORK CONSISTS OF HAND WORK (SHOVEL WORK) MOTOR PATROL GRADER IS USED FOR GRADING THE PROJECT SITE FOR COMPACTION BEFORE PAVING OPERATIONS. OTHER TRUCKS CONSIST OF THE FOLLOWING: 1) O-8,000 GALLON WATER TRUCK USED FOR WATERING THE PROJECT SITE TO HELP WITH COMPACTION BEFORE PAVING OPERATIONS 2) OIL DISTRIBUTOR USED TO DISTRIBUTE OIL DURING CHIP SEALING OPERATIONS</text_data><comment_date>2018-10-05T00:00:00</comment_date></row><row _id="row-3g6z~5fx6-zejy" _uuid="00000000-0000-0000-011B-CC0B73A35845" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3g6z~5fx6-zejy"><intent_id>475846</intent_id><project_id>673609</project_id><text_data>Repairing lawn that was damaged during installation of portable classrooms.  Light landscape grading and seeding. (No equipment for grading and seeding). Also, we are expanding the width of an existing fire lane by installing seeded lawn reinforced with plastic geoblock.  Excavating 2&amp;quot; to install geoblock.  Equipment used will be a excavator. So this work will be the General Labor rate and Excavator rate.</text_data><comment_date>2011-09-01T00:00:00</comment_date></row><row _id="row-2yzf_wafc-reqd" _uuid="00000000-0000-0000-689E-A3823BEFA9D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2yzf_wafc-reqd"><intent_id>1004729</intent_id><project_id>877056</project_id><text_data>Journeyman Class 4 Fringe Package = Ind Acct Pension ($9.00) / Pension ($5.55) / Occ Health ($0.08) / Health ($9.24) / Apprenticeship ($1.00) / Industry Fund ($0.10) / LMCT ($0.05) / Int�l Trng Fund ($0.10) = $25.12</text_data><comment_date>2019-09-04T00:00:00</comment_date></row><row _id="row-2puz-ajjq-g96p" _uuid="00000000-0000-0000-1BB1-4661C62B0762" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2puz-ajjq-g96p"><intent_id>677658</intent_id><project_id>755005</project_id><text_data>installation of communications 4 pair cabling interior of the building</text_data><comment_date>2015-02-19T00:00:00</comment_date></row><row _id="row-xnzq.u7va.47zr" _uuid="00000000-0000-0000-C5B6-4E8984664C42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xnzq.u7va.47zr"><intent_id>835961</intent_id><project_id>817305</project_id><text_data>HIRED BY SUB DONALD B MURPHY</text_data><comment_date>2017-05-24T00:00:00</comment_date></row><row _id="row-j7qr.hnb7_v33s" _uuid="00000000-0000-0000-7E6A-EAC9FA201DEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j7qr.hnb7_v33s"><intent_id>1264365</intent_id><project_id>1029793</project_id><text_data>Invoice #555282   $2830.51</text_data><comment_date>2022-09-06T00:00:00</comment_date></row><row _id="row-7r7x-ggi6-qeu9" _uuid="00000000-0000-0000-06ED-5D3022C01C9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7r7x-ggi6-qeu9"><intent_id>527124</intent_id><project_id>693353</project_id><text_data>072052</text_data><comment_date>2012-08-08T00:00:00</comment_date></row><row _id="row-zpsp~6szk_rgvz" _uuid="00000000-0000-0000-E58A-2092E8DEBEDB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zpsp~6szk_rgvz"><intent_id>498780</intent_id><project_id>682085</project_id><text_data>Corrects:#1 - Apartments#2 - No basement or garage and 3 story structure#3 - Multi family housing, (a) permanent residence only#4 - Each unit has its own self-contained kitchen#5 - Each unit has its own bathroom#6 - There is a community facility and manager's office on site#7 - No public use, only resident use</text_data><comment_date>2012-02-14T00:00:00</comment_date></row><row _id="row-euyc~m8da-z7cd" _uuid="00000000-0000-0000-B0F6-93F175BFC2B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-euyc~m8da-z7cd"><intent_id>547554</intent_id><project_id>701045</project_id><text_data>Job # C10265</text_data><comment_date>2012-12-07T00:00:00</comment_date></row><row _id="row-9pb2~6kqp.f58w" _uuid="00000000-0000-0000-116E-C0516B054FA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9pb2~6kqp.f58w"><intent_id>593429</intent_id><project_id>710147</project_id><text_data>Work to be performed will be hydromulching with a 75 hp Bowie Hydroseeder</text_data><comment_date>2013-09-12T00:00:00</comment_date></row><row _id="row-y8yu~apen.36d5" _uuid="00000000-0000-0000-879B-68849C0F4EC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8yu~apen.36d5"><intent_id>818943</intent_id><project_id>766810</project_id><text_data>We are a staffing company. Provide and install cat 6 cabling for voice (phones) and data (computers). Terminate, test and label. Cabling will be run indoors.</text_data><comment_date>2017-03-03T00:00:00</comment_date></row><row _id="row-f9w9-kp4t_i87f" _uuid="00000000-0000-0000-7FCC-730C287D6A94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f9w9-kp4t_i87f"><intent_id>861057</intent_id><project_id>831936</project_id><text_data>77018 TRAC WI COOLER</text_data><comment_date>2017-09-06T00:00:00</comment_date></row><row _id="row-zek5~5ip5~eggn" _uuid="00000000-0000-0000-EF72-D020190C2DB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zek5~5ip5~eggn"><intent_id>784257</intent_id><project_id>800539</project_id><text_data>1)HVAC Service, 2) Single Family Residence, 3) One level , 4) A)NO, B)NO, C)YES, D)NO, E)NO, F)NO, G)NO, H)NO, I)NO, J)NO, 5) one kitchen in residence, 6) one bathroom in home,  7) No, 8) No</text_data><comment_date>2016-08-23T00:00:00</comment_date></row><row _id="row-3ra9.vjfk_8pff" _uuid="00000000-0000-0000-5D7F-1CE4CF08F77D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ra9.vjfk_8pff"><intent_id>1118776</intent_id><project_id>948556</project_id><text_data>National Electrical Benefit Fund- (retirement)- $1.67National Electrical Annuity Plan (retirement)- $11.90Lineco (insurance)- $6.75Health Reimbrsement Arrangement- $1.00</text_data><comment_date>2021-02-10T00:00:00</comment_date></row><row _id="row-by46~hqef_ky2m" _uuid="00000000-0000-0000-07AB-811EBCB04C9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-by46~hqef_ky2m"><intent_id>1104736</intent_id><project_id>925913</project_id><text_data>Trucking; hauling of materials</text_data><comment_date>2020-11-19T00:00:00</comment_date></row><row _id="row-y9w8-udme-8maq" _uuid="00000000-0000-0000-C5A5-5139D159895A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y9w8-udme-8maq"><intent_id>1031047</intent_id><project_id>904227</project_id><text_data>9842929</text_data><comment_date>2020-01-10T00:00:00</comment_date></row><row _id="row-d4d8_bq2h-kgja" _uuid="00000000-0000-0000-B1F8-9186C8A34117" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4d8_bq2h-kgja"><intent_id>851973</intent_id><project_id>827135</project_id><text_data>1-Replace flood lights, porch lights, exhaust fans and install humidity sensors/switches 2 - apartment 3-two 4-residential dwelling a) no b) no c) yes d0 no e)no f) no g) no h) no i) no j) no k) no l) n/a.  5 - yes 6-yes 7-no 8-no</text_data><comment_date>2017-08-02T00:00:00</comment_date></row><row _id="row-qxc3_td35.fdv6" _uuid="00000000-0000-0000-4B45-7595F9289779" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qxc3_td35.fdv6"><intent_id>1219304</intent_id><project_id>1004548</project_id><text_data>INV # 88474229 SR # 51477520</text_data><comment_date>2022-03-21T00:00:00</comment_date></row><row _id="row-7e9i_ssfg.7qha" _uuid="00000000-0000-0000-AB29-D300D733D7FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7e9i_ssfg.7qha"><intent_id>737980</intent_id><project_id>771996</project_id><text_data>15-W156</text_data><comment_date>2015-12-16T00:00:00</comment_date></row><row _id="row-bvmq-brtb_etcy" _uuid="00000000-0000-0000-2EC6-FF8B211D8247" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bvmq-brtb_etcy"><intent_id>1179281</intent_id><project_id>980223</project_id><text_data>We have submitted everything for our WA Contractor's License. Has it been approved yet?</text_data><comment_date>2022-01-07T00:00:00</comment_date></row><row _id="row-yvug~ynmy~sdwu" _uuid="00000000-0000-0000-4777-B29339864041" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yvug~ynmy~sdwu"><intent_id>578739</intent_id><project_id>714182</project_id><text_data>GENERAL LABOR - USING SHOVEL TO SHOVEL ROCK &amp; MANUAL LABOROTHER TRUCKS - 1,500 GAL DISTRIBUTOR USED TO SHOOT CSS-1 OVER ROADWAYOTHER TRUCKS - 3,000 GAL WATER TRRUCK SPRAYING WATER OVER ROADWAY</text_data><comment_date>2013-07-01T00:00:00</comment_date></row><row _id="row-ezmy_wz2w_8a48" _uuid="00000000-0000-0000-F176-60367052B363" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezmy_wz2w_8a48"><intent_id>902410</intent_id><project_id>849852</project_id><text_data>Requesting a technician to pick up new UPS&amp;#39;s for Western WA libraries. Go to each location and swap out old UPS to new UPS&amp;#39;s for the voice and data network system.</text_data><comment_date>2018-05-03T00:00:00</comment_date></row><row _id="row-ryve_64i3_gfak" _uuid="00000000-0000-0000-985F-92F92D5AA058" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ryve_64i3_gfak"><intent_id>1235655</intent_id><project_id>1014478</project_id><text_data>3001952-9003</text_data><comment_date>2022-05-23T00:00:00</comment_date></row><row _id="row-hreu.nisf.cb5s" _uuid="00000000-0000-0000-4FF1-4807D5EB9385" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hreu.nisf.cb5s"><intent_id>743577</intent_id><project_id>783607</project_id><text_data>Scope of work: grub out by hand weeds and groundcovers from existing beds; spread casoron and topsoil, raising irrigation heads as needed, install 182 feet of pro-edging and wood chip mulch using shovels, hoes, picks, rakes, buckets, hand tools, wheelbarrows and 10 yard landscape truck.</text_data><comment_date>2016-01-26T00:00:00</comment_date></row><row _id="row-gvg7~gw88_4tji" _uuid="00000000-0000-0000-4C38-5EF3AE34097E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gvg7~gw88_4tji"><intent_id>1187912</intent_id><project_id>942068</project_id><text_data>Landscape and irrigation</text_data><comment_date>2021-10-25T00:00:00</comment_date></row><row _id="row-nd8f_b623.dfxf" _uuid="00000000-0000-0000-1E16-F46240C34E50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nd8f_b623.dfxf"><intent_id>901115</intent_id><project_id>848745</project_id><text_data>GENERAL LABOR WORK CONSISTS OF HAND WORK ONLY (SHOVEL WORK) NO POWER EQUIPMENT OR POWER TOOLS. MOTOR PATROL GRADER IS USED FOR GRADING THE PROJECT SITE FOR COMPACTION BEFORE PAVING OPERATIONS.OTHER TRUCKS CONSIST OF THE FOLLOWING: ONE (1) 0-8,000 GALLON WATER TRUCK USED FOR WATERING THE PROJECT SITE FOR COMPACTION DURING THE GRADING PROCESS.        $15.56(BASE) + $3.89 (FRINGE) OIL DISTRIBUTOR USED FOR DISTRIBUTION OF OIL DURING CHIP SEALING OPERATIONS. $45.52(BASE) + $11.38(FRINGE)</text_data><comment_date>2018-04-26T00:00:00</comment_date></row><row _id="row-pm44-bgrt.s2gv" _uuid="00000000-0000-0000-00BF-41709FB28E3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pm44-bgrt.s2gv"><intent_id>535422</intent_id><project_id>696304</project_id><text_data>PO F-502363 Replace Condensor Compressor, Crankcase Heater, Liquid Dryer, Board.</text_data><comment_date>2012-09-19T00:00:00</comment_date></row><row _id="row-cjrd.9y82-bqib" _uuid="00000000-0000-0000-DCB4-D1981DB76FEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjrd.9y82-bqib"><intent_id>968652</intent_id><project_id>877168</project_id><text_data>1519093</text_data><comment_date>2019-04-01T00:00:00</comment_date></row><row _id="row-6b44-xmvq~hztz" _uuid="00000000-0000-0000-D6F7-618B48B90622" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6b44-xmvq~hztz"><intent_id>888990</intent_id><project_id>812862</project_id><text_data>HIRED BY SUB GOODFELLOW BROTHERS</text_data><comment_date>2018-02-19T00:00:00</comment_date></row><row _id="row-cy9v_rtm7~zdy2" _uuid="00000000-0000-0000-A04C-713A92C66F15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cy9v_rtm7~zdy2"><intent_id>586076</intent_id><project_id>713782</project_id><text_data>Equipment &amp; tools:1.	Truck Driver-Driving Truck Mounted Hydro seeder (Sterling/Kenworth/International with 3/4 axles and 0-8000 gallon tank) and Skidsteer2.	Nozzle man-Spraying hydro mulch &amp; Operating Skidster3.	Landscape Laborer: Loading Seed, Fertilizer, Mulch and cleaning.</text_data><comment_date>2013-08-07T00:00:00</comment_date></row><row _id="row-2ee2~4b7w_k8ci" _uuid="00000000-0000-0000-408C-C4F376F60684" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ee2~4b7w_k8ci"><intent_id>1255763</intent_id><project_id>989341</project_id><text_data>i am owner operator no employees</text_data><comment_date>2022-08-08T00:00:00</comment_date></row><row _id="row-jch5.4gq7-bfb6" _uuid="00000000-0000-0000-D0F9-1975D8A9D4C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jch5.4gq7-bfb6"><intent_id>818946</intent_id><project_id>814773</project_id><text_data>PROVIDE LABOR AND MATERIAL FOR ELECTRICAL PROJECTS AT THE MUSEUM AND FIRE STATION</text_data><comment_date>2017-03-03T00:00:00</comment_date></row><row _id="row-4k6d-5c37-5e7a" _uuid="00000000-0000-0000-B6FF-3D0DB7C202FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4k6d-5c37-5e7a"><intent_id>571540</intent_id><project_id>711798</project_id><text_data>Form filed by: William J Martin</text_data><comment_date>2013-05-24T00:00:00</comment_date></row><row _id="row-gs8s~77yv.p7pj" _uuid="00000000-0000-0000-726E-FAE4A818969F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gs8s~77yv.p7pj"><intent_id>923707</intent_id><project_id>855958</project_id><text_data>Job #115471-001 Related to Job #202937-001</text_data><comment_date>2018-08-07T00:00:00</comment_date></row><row _id="row-mxuh_98i2-huia" _uuid="00000000-0000-0000-82D2-D968A2E42A09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mxuh_98i2-huia"><intent_id>510296</intent_id><project_id>684331</project_id><text_data>1. Utility Improvement work at CWU2. No3.  Our employees perform construction quality control testing.  We obtain a sample of soil/gravel from the project.  At our laboratory, we perform a moisture/density determination test which determines the maximum density of the material.  On-site, we test the compaction (density) of the dirt/gravel using a nuclear densometer.  We obtain a sample of wet concrete directly from the concrete truck.  This small sample is placed in a plastic sylinder container.  The container is left on-site for 24 hours so the concrete can begin to harden.  Our technician returns to the job site, obtains the cylinders and transports to our facility.  The cylinders are broken by our break machine after 7 days and after 28 days.  This determines the strength of the concrete.4.  Our technician use a nuclear densometer and miscellaneous engineering instruments including a Skidmore Bolt testing machine to test the tightness of bolts, Schmidt Hammer which tests the strength of in place concrete, weld gauge, fireproofing thickness gauge, thermometers, plumb bob, tape measure, etc.</text_data><comment_date>2012-05-21T00:00:00</comment_date></row><row _id="row-td9h~ar9y.c3tn" _uuid="00000000-0000-0000-1A62-1692770313E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-td9h~ar9y.c3tn"><intent_id>978949</intent_id><project_id>881605</project_id><text_data>Providing the beautification of an area adjacent to the roadway using a blower/mulch truck. Blowing beauty bark into designated areas.</text_data><comment_date>2019-05-22T00:00:00</comment_date></row><row _id="row-2tm3_es46-vfr6" _uuid="00000000-0000-0000-3E59-4AEF8CAF2727" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tm3_es46-vfr6"><intent_id>1090183</intent_id><project_id>923567</project_id><text_data>1120096</text_data><comment_date>2020-09-22T00:00:00</comment_date></row><row _id="row-kake_ivrm_cw73" _uuid="00000000-0000-0000-449E-A55EFDA8BAAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kake_ivrm_cw73"><intent_id>476515</intent_id><project_id>666372</project_id><text_data>Tighten nuts and bolts on prefabbed aluminum access ramps using 1/2&amp;quot; wrnch and sockets sets.</text_data><comment_date>2011-09-27T00:00:00</comment_date></row><row _id="row-kih8_zapm_ujm3" _uuid="00000000-0000-0000-9831-DD219599CF83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kih8_zapm_ujm3"><intent_id>515471</intent_id><project_id>689035</project_id><text_data>The truck used by our truck driver is a 2006 Mitsubishi flatbed It is used to deliver materials to jobsites and remove construction debris from jobsites.</text_data><comment_date>2012-06-12T00:00:00</comment_date></row><row _id="row-t4qy~sjfr-y7hm" _uuid="00000000-0000-0000-772D-854D2DECF2ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t4qy~sjfr-y7hm"><intent_id>1161480</intent_id><project_id>969225</project_id><text_data>INSTALL PLANT MATERIALS, LAWN, BARK MULCH AND IRRIGATION.</text_data><comment_date>2021-07-19T00:00:00</comment_date></row><row _id="row-8f6k~y2cn_xyrs" _uuid="00000000-0000-0000-0578-9BD8F21B9A87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8f6k~y2cn_xyrs"><intent_id>865883</intent_id><project_id>833820</project_id><text_data>Removing and installing sod along the south side of the sports field area</text_data><comment_date>2017-09-28T00:00:00</comment_date></row><row _id="row-sie7_bfts_vv6p" _uuid="00000000-0000-0000-D5D8-8CF3DCFB8357" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sie7_bfts_vv6p"><intent_id>655416</intent_id><project_id>744705</project_id><text_data>1514092</text_data><comment_date>2014-09-18T00:00:00</comment_date></row><row _id="row-3v89~chq9-h4p6" _uuid="00000000-0000-0000-3DD4-98FFB4AD9D11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3v89~chq9-h4p6"><intent_id>1030842</intent_id><project_id>895214</project_id><text_data>1119143</text_data><comment_date>2020-01-09T00:00:00</comment_date></row><row _id="row-d93e_mtwf-uwc6" _uuid="00000000-0000-0000-C1DD-CFB023DA7425" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d93e_mtwf-uwc6"><intent_id>1048362</intent_id><project_id>914105</project_id><text_data>SC191223-0104</text_data><comment_date>2020-03-30T00:00:00</comment_date></row><row _id="row-83zg_7qe4.866p" _uuid="00000000-0000-0000-8CAC-D656C05DFBEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-83zg_7qe4.866p"><intent_id>571361</intent_id><project_id>649039</project_id><text_data>This new intent is because we are changing our hiring contractor. The old intent # 540276 should be deleted.</text_data><comment_date>2013-05-23T00:00:00</comment_date></row><row _id="row-yjsc-hj5w~cdv7" _uuid="00000000-0000-0000-7539-A123CF06D8BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yjsc-hj5w~cdv7"><intent_id>589304</intent_id><project_id>718353</project_id><text_data>SPRINKLER FITTER # 1 FRINGE BENEFITS $15.61 INSURANCE BENEFITS $12.50 $3.11 HOLIDAYSPRINKLER FITTER # 3 FRINGE BENEFITS $ 11.83 INSURANCE BENEFITS $ 11.83</text_data><comment_date>2013-09-04T00:00:00</comment_date></row><row _id="row-jn6f_7qq8_8jn4" _uuid="00000000-0000-0000-B813-B2B831AE329A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jn6f_7qq8_8jn4"><intent_id>1007448</intent_id><project_id>880738</project_id><text_data>INTENT 301FNJ0583</text_data><comment_date>2019-09-16T00:00:00</comment_date></row><row _id="row-q74t-cvhp-8y72" _uuid="00000000-0000-0000-53DE-3D157DA1288D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q74t-cvhp-8y72"><intent_id>831687</intent_id><project_id>820190</project_id><text_data>the units are part of the boats exhaust system. they take up expansion and contraction in exhaust piping as it heats up and cools down. the boat is in dry dock (on land), for repairs.  we fabricated new flex joints per the original samples. I hope this helps. Thank you.</text_data><comment_date>2017-05-12T00:00:00</comment_date></row><row _id="row-ujtf.yn7q~h6wm" _uuid="00000000-0000-0000-6E11-05D5284068E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ujtf.yn7q~h6wm"><intent_id>696093</intent_id><project_id>762966</project_id><text_data>REROUTE IRRIGATION</text_data><comment_date>2015-05-22T00:00:00</comment_date></row><row _id="row-du9q.44fx-x66v" _uuid="00000000-0000-0000-4FEA-94A8F75F4F89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-du9q.44fx-x66v"><intent_id>1057886</intent_id><project_id>903737</project_id><text_data>Whole Proj:  Construction of a new middle school.Our Portion:  Beautification of areas adjacent to new middle school through the installation of an automatic irrigation system, trees, shrubs, groundcovers, hydroseeded lawns, topsoil and bark mulch.Equip:  Mini-excavator 44hp &amp; backhoe 70hp (both under the 90hp threshold), hydroseeder, Wheel Tractor-Farmall Type, Loader Under 6CY, Roller, other than plant mix, Dump Truck.Other Trucks:  KW Equipment truck &amp; trailer used to haul equipment and materials to site.</text_data><comment_date>2020-05-13T00:00:00</comment_date></row><row _id="row-uiup_aja7.a3bv" _uuid="00000000-0000-0000-0DBA-AB6C6B6A7BC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uiup_aja7.a3bv"><intent_id>454636</intent_id><project_id>591195</project_id><text_data>**REVISED**ORIGINAL INTENT TO PAY PREVAILING WAGE WAS APPROVED ON 04/05/2011INTENT ID: 448340</text_data><comment_date>2011-05-06T00:00:00</comment_date></row><row _id="row-qrpw.e9xs_mvq9" _uuid="00000000-0000-0000-5E02-FF5134AF7E2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qrpw.e9xs_mvq9"><intent_id>957182</intent_id><project_id>870103</project_id><text_data>Daphne Beehler1804 W Grant St.Yakima, WA 98902</text_data><comment_date>2019-01-27T00:00:00</comment_date></row><row _id="row-maiw.4eue~tbtm" _uuid="00000000-0000-0000-316C-3412A04B1744" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-maiw.4eue~tbtm"><intent_id>457692</intent_id><project_id>666856</project_id><text_data>Hourly benefits:  10.525 NEI Welfare Plan; 6.46 NEI Pension Plan; .55 NEI Educational Fund; .20 Work Preservation Fund; 1.5805 Holidays; 4.216 Vacation; 4.25 401K Annuity</text_data><comment_date>2011-05-27T00:00:00</comment_date></row><row _id="row-wvjg-r4j7-x4mn" _uuid="00000000-0000-0000-4CAC-669846BB3F38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wvjg-r4j7-x4mn"><intent_id>1158737</intent_id><project_id>966393</project_id><text_data>McDee will be completing the surround pad of a commercial site.  Bella Terra will be installing The beautification of a plot of land through addition of lawns, trees and bushes. Bella Terra will be installing an irrigation system, via trenching,at 18' depth, and spreading top soil and mulch..</text_data><comment_date>2021-07-28T00:00:00</comment_date></row><row _id="row-9wtx~bvau-khfv" _uuid="00000000-0000-0000-BA44-ADAAA439A4B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9wtx~bvau-khfv"><intent_id>531116</intent_id><project_id>676044</project_id><text_data>Filed by Robert Johnston</text_data><comment_date>2012-08-28T00:00:00</comment_date></row><row _id="row-68wt-xi56-m3mc" _uuid="00000000-0000-0000-048B-0488E63A45E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-68wt-xi56-m3mc"><intent_id>577405</intent_id><project_id>711951</project_id><text_data>023009</text_data><comment_date>2013-06-25T00:00:00</comment_date></row><row _id="row-xadc.xd8t.y3fh" _uuid="00000000-0000-0000-A8B3-4E150662F98E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xadc.xd8t.y3fh"><intent_id>850348</intent_id><project_id>822114</project_id><text_data>indoor and outdoor telecom cabling (pull, terminate &amp; test) throughout building</text_data><comment_date>2017-07-26T00:00:00</comment_date></row><row _id="row-fp2h.2cat_yd4f" _uuid="00000000-0000-0000-D93F-5EBA872D9D58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fp2h.2cat_yd4f"><intent_id>866148</intent_id><project_id>833919</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-09-29T00:00:00</comment_date></row><row _id="row-r7ac.p3iv.zhg8" _uuid="00000000-0000-0000-777A-B6A581836387" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r7ac.p3iv.zhg8"><intent_id>1149964</intent_id><project_id>965272</project_id><text_data>Under the supervison of Outreach, Bellevue PD and Bellvue parks we will remove debris, trash, bio-waste, medical waste, hazardous waste and structures. Hazmat worker C wages due to the hazardous nature of the job and high chance of encountering communicable pathogens, dangerous residue, bodily fluids and airborne fentayl particles.</text_data><comment_date>2021-06-04T00:00:00</comment_date></row><row _id="row-rbye_uve7.ix8g" _uuid="00000000-0000-0000-89AB-A098D9BBE602" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rbye_uve7.ix8g"><intent_id>1227594</intent_id><project_id>961775</project_id><text_data>JCI Project # 621246811 - Cheryl Graves, PC - Lyle Fortin, Sales</text_data><comment_date>2022-04-21T00:00:00</comment_date></row><row _id="row-abjq.8ty6.p5na" _uuid="00000000-0000-0000-DF29-ADDD170272B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-abjq.8ty6.p5na"><intent_id>869548</intent_id><project_id>835289</project_id><text_data>WE WILL BE AERATING (PUNCHING HOLES) AND TOP DRESSING (SPREADING A LAYER OF SAND). THESE PROCESSES HAVE BEEN APPROVED AS FALLING UNDER THE WA LANDSCAPING CODE. WE ARE IN OREGON, AND WE HAVE THE RECIPRICAL AGREEMENT WITH WASHINGTON FOR WORKERS COMP</text_data><comment_date>2017-10-17T00:00:00</comment_date></row><row _id="row-wtg8-gupd-hvnm" _uuid="00000000-0000-0000-22FB-732ECA004D4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wtg8-gupd-hvnm"><intent_id>862023</intent_id><project_id>828746</project_id><text_data>3000349</text_data><comment_date>2017-09-12T00:00:00</comment_date></row><row _id="row-n2yn~7anx~5qbm" _uuid="00000000-0000-0000-1AA5-24586BE0212E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2yn~7anx~5qbm"><intent_id>519315</intent_id><project_id>418040</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2012-06-27T00:00:00</comment_date></row><row _id="row-h5cy.je39-rudj" _uuid="00000000-0000-0000-4994-776F4C0A6275" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h5cy.je39-rudj"><intent_id>730525</intent_id><project_id>776314</project_id><text_data>Cleaning services will be done once a week</text_data><comment_date>2015-11-08T00:00:00</comment_date></row><row _id="row-av9x.9n3h_6si3" _uuid="00000000-0000-0000-59F6-494900A3C75F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-av9x.9n3h_6si3"><intent_id>1098920</intent_id><project_id>937453</project_id><text_data>Project # 108065 - Seattle</text_data><comment_date>2020-10-27T00:00:00</comment_date></row><row _id="row-f7mm~25vn_u9y2" _uuid="00000000-0000-0000-89AE-EC8FECEDA145" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f7mm~25vn_u9y2"><intent_id>787535</intent_id><project_id>791040</project_id><text_data>Owner Operator Dump Truck Driver</text_data><comment_date>2016-09-06T00:00:00</comment_date></row><row _id="row-khe8-yz7t_phkv" _uuid="00000000-0000-0000-6E2E-6F24ED80E5E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-khe8-yz7t_phkv"><intent_id>822939</intent_id><project_id>810211</project_id><text_data>Filed by HC Todhunter</text_data><comment_date>2017-03-27T00:00:00</comment_date></row><row _id="row-4ff4_waih~6jv6" _uuid="00000000-0000-0000-A2DF-14B41D8B32B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ff4_waih~6jv6"><intent_id>614959</intent_id><project_id>728565</project_id><text_data>Maintenance of existing landscape along city streets. Tasks: lawn mowing/edging, plant bed debris clean up, shrub pruning, weed removal, raking, leaf removal. Tools: Gas powered lawn mowers 5 &amp; 11 hp; gas powered edgers; 2 cycle hand held line trimmers; 2 cycle leaf blowers; 2 cycle hedge shears; hand pruners; loppers; rakes.</text_data><comment_date>2014-02-04T00:00:00</comment_date></row><row _id="row-vivr_6quj_gcse" _uuid="00000000-0000-0000-1D63-B25963044827" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vivr_6quj_gcse"><intent_id>1172204</intent_id><project_id>976574</project_id><text_data>Service pickup truck, mini excavator, line pliers, cutters and rail grinders.</text_data><comment_date>2021-09-10T00:00:00</comment_date></row><row _id="row-asph-yvu5~uaus" _uuid="00000000-0000-0000-93FE-4A320C1F62EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-asph-yvu5~uaus"><intent_id>473763</intent_id><project_id>609628</project_id><text_data>My workmens comp is through Idaho</text_data><comment_date>2011-08-23T00:00:00</comment_date></row><row _id="row-db7c-mmy7_7si2" _uuid="00000000-0000-0000-97E4-A3182032F60B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-db7c-mmy7_7si2"><intent_id>1253824</intent_id><project_id>1024372</project_id><text_data>SC 220719-0102</text_data><comment_date>2022-08-01T00:00:00</comment_date></row><row _id="row-nsim~q7tf-s9ak" _uuid="00000000-0000-0000-E395-9616BE24DAB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nsim~q7tf-s9ak"><intent_id>523087</intent_id><project_id>691880</project_id><text_data>Cynthia Fryer403 GregorColton, WA 99113509-592-4380 Contract: 2370-489Single family home. Install exhuast fan assemly and sevice heating system.Cost: $1159.93Barbara Reed301 S. MontgomeryUniontown, WA 99179509-229-3622Contract:  2370-487Single family home. Install junction box covers and install bathroom exhaust fan on timerCost: $875.84</text_data><comment_date>2012-07-18T00:00:00</comment_date></row><row _id="row-m69e~pfuy_jpnn" _uuid="00000000-0000-0000-2060-1A44777CDFA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m69e~pfuy_jpnn"><intent_id>1081850</intent_id><project_id>929800</project_id><text_data>Interior remodeling of apartment units and common area.Yes1a. No b. No c. Yes d. No e. No f. No g. No h. No i. No j. No k. No l. No YesYesYesNo</text_data><comment_date>2020-08-20T00:00:00</comment_date></row><row _id="row-in2j_j2i9-b6jk" _uuid="00000000-0000-0000-E239-DD1016C58C10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-in2j_j2i9-b6jk"><intent_id>1166408</intent_id><project_id>973743</project_id><text_data>Blythe work order 95525^</text_data><comment_date>2021-08-04T00:00:00</comment_date></row><row _id="row-2b54~6p49-xasu" _uuid="00000000-0000-0000-A3E1-7BA09DA2C945" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2b54~6p49-xasu"><intent_id>994660</intent_id><project_id>872390</project_id><text_data>PC1 - Job #4202CB</text_data><comment_date>2019-07-25T00:00:00</comment_date></row><row _id="row-7p9d~jpzx~k5jp" _uuid="00000000-0000-0000-E3D5-468031690AF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7p9d~jpzx~k5jp"><intent_id>466911</intent_id><project_id>617563</project_id><text_data>We have workers comp insurance in oregon with liberty northwest,  We are considered to be janitorial and are not required to have a contractors license and have been in the business for years without this requirement</text_data><comment_date>2011-07-31T00:00:00</comment_date></row><row _id="row-snzg_k5xy~vfaa" _uuid="00000000-0000-0000-DDEE-5B498935D045" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-snzg_k5xy~vfaa"><intent_id>519691</intent_id><project_id>511051</project_id><text_data>Paid time offVacation 120Holiday 72Fringe BenefitsPd Time Off $3.06, $2.80 &amp; $2.59Health Welfare $7.09Pension $5.75</text_data><comment_date>2012-06-29T00:00:00</comment_date></row><row _id="row-2nve.s2pn.d9pg" _uuid="00000000-0000-0000-5A4E-AF5654AC49DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2nve.s2pn.d9pg"><intent_id>532110</intent_id><project_id>687603</project_id><text_data>A) Project Description: Installation of specialized sewer valves for the prevention of sewer overflow. B) Description of or Work: Removing shrubs for replanting, replanting shrubs, planting 6'-8' coniferous trees, mulching.</text_data><comment_date>2012-09-06T00:00:00</comment_date></row><row _id="row-knr7-dts7.xxd4" _uuid="00000000-0000-0000-7A1A-6FBE083CA1A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knr7-dts7.xxd4"><intent_id>753394</intent_id><project_id>777347</project_id><text_data>To the best of my knowledge, this is a new building constructed on an existing site.  We have been contracted to install trees, shrubs, 6&amp;quot; of topsoil, 2&amp;quot; of compost, geo-block and seed lawn.  We are tying into an existing irrigation system with mainline/laterals, valves, heads and drip on battery operated controls. If trenching is required for main/lateral lines, we exclude any work below 24&amp;quot;.</text_data><comment_date>2016-03-25T00:00:00</comment_date></row><row _id="row-ijnh.d9cr-6era" _uuid="00000000-0000-0000-7B07-2C8C8906E62D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijnh.d9cr-6era"><intent_id>907858</intent_id><project_id>852060</project_id><text_data>#1 General Maintenance, #2 Apartment, #3 2, #4 Residential Apartment Rental, A No, B No, C No, D No, E Yes, F No, G No, H No, I No, J No, K Yes, L No, #5 Yest, #6 Yes, #7 Yes, #8 No</text_data><comment_date>2018-05-30T00:00:00</comment_date></row><row _id="row-89fe-mvq2_8grt" _uuid="00000000-0000-0000-03F5-E5B71CAB01F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89fe-mvq2_8grt"><intent_id>534257</intent_id><project_id>690199</project_id><text_data>We will be planting app. 249 - 1 gallon plants, 34 - 5 gallon plants, and 700 plant plugs.  No topsoil, no bark mulch, no irrigation, no Bobcat, no dumptrucks, no tractor, no grading at all.</text_data><comment_date>2012-09-13T00:00:00</comment_date></row><row _id="row-ch39_nyrp_2aiw" _uuid="00000000-0000-0000-950A-47AE1CCB3CE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ch39_nyrp_2aiw"><intent_id>1025886</intent_id><project_id>901516</project_id><text_data>FILED BY MICHELLE LYONS</text_data><comment_date>2019-12-09T00:00:00</comment_date></row><row _id="row-8yu7-t7at.cupd" _uuid="00000000-0000-0000-040D-0BD9AB8DC919" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yu7-t7at.cupd"><intent_id>1031002</intent_id><project_id>864901</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2020-01-10T00:00:00</comment_date></row><row _id="row-52zq-69j3.qhh3" _uuid="00000000-0000-0000-CDEB-D1258B859826" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-52zq-69j3.qhh3"><intent_id>699733</intent_id><project_id>762031</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.&amp;quot;</text_data><comment_date>2015-06-24T00:00:00</comment_date></row><row _id="row-25u9_dj2k_mvrw" _uuid="00000000-0000-0000-E849-35085DFEDC30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-25u9_dj2k_mvrw"><intent_id>1284249</intent_id><project_id>1041272</project_id><text_data>In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions in the notes section at the bottom of this screen: #1 - Describe the work that your firm was contracted to perform.  Removing an oil furnace and replacing with an electric furnace  #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single Family home #3 - Including any basement or garage, how many stories or levels does the structure have? One to maximum 2 #4 - What is the building used for?  Residential--Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO  (b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility?NO4 (g) Treatment services? NO(h) Assisted living services? NO (I) Dormitories?NO (j) Counseling?NO (k) Is each room and/or bed in the structure rented separately? NO(l) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? N/A  #6 - Does each dwelling unit have its own bathroom? N/A #7 - Is there a community facility or manager�s office on site? N/A   #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2022-11-16T00:00:00</comment_date></row><row _id="row-yb56_f973.chbq" _uuid="00000000-0000-0000-6008-07E1C8E2962C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yb56_f973.chbq"><intent_id>878904</intent_id><project_id>832953</project_id><text_data>HIRED BY SUB SERPANOK CONSTRUCTION</text_data><comment_date>2017-12-13T00:00:00</comment_date></row><row _id="row-kxwb_4yab-y4nv" _uuid="00000000-0000-0000-2960-FC9B1DE262C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kxwb_4yab-y4nv"><intent_id>495421</intent_id><project_id>680739</project_id><text_data>The scope of work for this project is to provide and install new voice and data cable.</text_data><comment_date>2012-01-03T00:00:00</comment_date></row><row _id="row-acy8_kwwr-dhzf" _uuid="00000000-0000-0000-5EC7-8AFABC5F495D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-acy8_kwwr-dhzf"><intent_id>1012895</intent_id><project_id>893187</project_id><text_data>General laborer consists of hand work only (no power tools or equipment) $31.44 base + $#7.85 pensionBlade operator is used to help with compaction before paving operations $36.00 base + $8.99 pensionOther trucks consists of the following:1) 0 to 8,000 gallon water truck used to help with compaction and dust control $37.23 base + $9.30 pension2) Oil distributor is used to distribute oil for chip sealing operations $37.23 base + $9.30 pension</text_data><comment_date>2019-10-08T00:00:00</comment_date></row><row _id="row-3dce.gvwd.cgar" _uuid="00000000-0000-0000-A6BD-2E2799D2018B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3dce.gvwd.cgar"><intent_id>906594</intent_id><project_id>851545</project_id><text_data>Lincoln St. #302, Bellingham, WA 982291. Air seal, attic blow, duct seal, belly blow, mechanical ventilation		2. Single family		3. 1		4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No		5. Yes		6. Yes		7. No		8. No</text_data><comment_date>2018-05-23T00:00:00</comment_date></row><row _id="row-89qd.pp9b_66uf" _uuid="00000000-0000-0000-AF01-D89A7F293BBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89qd.pp9b_66uf"><intent_id>637721</intent_id><project_id>736105</project_id><text_data>Fire alarm installation</text_data><comment_date>2014-07-08T00:00:00</comment_date></row><row _id="row-7qru.dtpw-u8r3" _uuid="00000000-0000-0000-B6C7-329C8FDDD793" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7qru.dtpw-u8r3"><intent_id>883964</intent_id><project_id>841735</project_id><text_data>The project is exempt from the payment of State prevailing wage based on the Housing Act of 1937 and 24 CFR 965.101 and all workers will be paid properly in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2018-01-18T00:00:00</comment_date></row><row _id="row-ay7g-g7cw-znzh" _uuid="00000000-0000-0000-98CA-BA65C9BA157D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ay7g-g7cw-znzh"><intent_id>820161</intent_id><project_id>815367</project_id><text_data>Single family dwelling</text_data><comment_date>2017-03-10T00:00:00</comment_date></row><row _id="row-22cs-bh8b~iqa4" _uuid="00000000-0000-0000-F426-C5CBBFB3548D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22cs-bh8b~iqa4"><intent_id>1120945</intent_id><project_id>943830</project_id><text_data>concrete ready mix deliveries</text_data><comment_date>2021-02-08T00:00:00</comment_date></row><row _id="row-f7wj_bdav_nhfp" _uuid="00000000-0000-0000-CE50-0A62E8EC925D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f7wj_bdav_nhfp"><intent_id>1036194</intent_id><project_id>900415</project_id><text_data>1119180</text_data><comment_date>2020-02-05T00:00:00</comment_date></row><row _id="row-mztr-37um.cgxp" _uuid="00000000-0000-0000-3E27-E47F950E9ED3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mztr-37um.cgxp"><intent_id>454539</intent_id><project_id>663551</project_id><text_data>In the future, please list the type, size, and PURPOSE of the equipment listed under &amp;quot;Truck Drivers/Other Trucks&amp;quot;.  Thank you.  (chrr235)</text_data><comment_date>2011-06-01T00:00:00</comment_date></row><row _id="row-tnib.vr93~5ng4" _uuid="00000000-0000-0000-3638-1EC012507EF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tnib.vr93~5ng4"><intent_id>539811</intent_id><project_id>697554</project_id><text_data>Work description includes seeding, topsoil placement to 4&amp;quot;, sod, planting and irrigation</text_data><comment_date>2012-10-15T00:00:00</comment_date></row><row _id="row-i3np-f8dj~wb8y" _uuid="00000000-0000-0000-108B-03CF18448DE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i3np-f8dj~wb8y"><intent_id>844889</intent_id><project_id>798961</project_id><text_data>Filed by Pam Kulcinski</text_data><comment_date>2017-07-03T00:00:00</comment_date></row><row _id="row-q95p-zujh~dmch" _uuid="00000000-0000-0000-73F6-70AA7BB74EFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q95p-zujh~dmch"><intent_id>1031684</intent_id><project_id>902774</project_id><text_data>General Laborer consists of hand work only (no power tools or equipment) $33.80 base + $8.45 pensionMotor Patrol Grader consists of Paving Machine (Asphalt) and Blade Operator $53.73 base + $13.43 pensionOther trucks consists of a 0 to 8,000 gallon water truck used to help with compaction and dust control $38.45 base + $9.61 pension</text_data><comment_date>2020-01-14T00:00:00</comment_date></row><row _id="row-r22c~5kuf.cn53" _uuid="00000000-0000-0000-4A12-1891C2785A10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r22c~5kuf.cn53"><intent_id>1080163</intent_id><project_id>929049</project_id><text_data>WO #393284</text_data><comment_date>2020-08-13T00:00:00</comment_date></row><row _id="row-ty6m_wgq3_4m3u" _uuid="00000000-0000-0000-2E46-3765D81DC794" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ty6m_wgq3_4m3u"><intent_id>1017951</intent_id><project_id>897922</project_id><text_data>FILED BY ROCKY LANG</text_data><comment_date>2019-10-25T00:00:00</comment_date></row><row _id="row-4syf_vvrc-tja4" _uuid="00000000-0000-0000-307D-8B80FB236CD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4syf_vvrc-tja4"><intent_id>728317</intent_id><project_id>775391</project_id><text_data>This is a riparian restoration project. The goal is to re-establish native plants, trees, shrubs, and grasses on a plot of ground in the vicinity of water (creek, river, pond, or lake) that has been inundated with non-native species. Our specific job on this project is called invasive removal. The purpose is to assure the survival of native plants by eliminating competing non-native plants (blackberries, canary grass, etc.) growing around them.Our workers will apply herbicides directly to plants, using a hand held wand attached to a small backpack tank, under the direct supervision of a licensed applicator. Our laborers will be paid a minimum of $11.35/hour, but actual pay will be $14.00-$15.00/hour. The number of worker per day may vary, we will start the project with 1 supervisor (owner) and 4 laborers.Our subcontractor will use an all terrain vehicle fitted with a tank and boom to apply herbicide to large open areas and solid blackberry thickets.</text_data><comment_date>2015-10-26T00:00:00</comment_date></row><row _id="row-393d_ahkh~itws" _uuid="00000000-0000-0000-644D-676821D9755D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-393d_ahkh~itws"><intent_id>537641</intent_id><project_id>579960</project_id><text_data>We are working as a subcontractor to a landscape company on this landscaping project. We will be installing compost or bark mulch as a topdressing to finish off the landscaped beds and our work falls under the landscape beautification category. Our laborers are responsible for backpack blower cleanup and will be paid according to the rates published for landscaping and planting laborer. The operator of the blower truck will be paid according to the oil distribution / mulch distribution power equipment operator category. Please approve this intent as filed. Thank you for your assistance.</text_data><comment_date>2012-10-02T00:00:00</comment_date></row><row _id="row-e86w-byyv.c3t8" _uuid="00000000-0000-0000-1240-8D6CB90A51A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e86w-byyv.c3t8"><intent_id>796559</intent_id><project_id>805148</project_id><text_data>I have revised the Fringe rate to the correct amount of $3.47 on Laborer # 3, I had accidentally enter the Hourly wage amount in the fringe section of this form.</text_data><comment_date>2016-10-21T00:00:00</comment_date></row><row _id="row-sr5n-9fgt_zs5r" _uuid="00000000-0000-0000-FF85-AFC1F73EFFDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sr5n-9fgt_zs5r"><intent_id>1189668</intent_id><project_id>985994</project_id><text_data>S031219</text_data><comment_date>2021-10-29T00:00:00</comment_date></row><row _id="row-uz7m-246e.dqm3" _uuid="00000000-0000-0000-011B-291018457D33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uz7m-246e.dqm3"><intent_id>652584</intent_id><project_id>733656</project_id><text_data>Form filed by: Amar Singh</text_data><comment_date>2014-09-05T00:00:00</comment_date></row><row _id="row-qzar.8qzr.ejuu" _uuid="00000000-0000-0000-55C8-6E3C592B7841" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qzar.8qzr.ejuu"><intent_id>629813</intent_id><project_id>728335</project_id><text_data>Form filed by: Paul Tillman</text_data><comment_date>2014-05-15T00:00:00</comment_date></row><row _id="row-4cfp_fdx8_xsjm" _uuid="00000000-0000-0000-B544-08D799566F95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4cfp_fdx8_xsjm"><intent_id>804914</intent_id><project_id>808344</project_id><text_data>Fernandez - SW 114th Street, Seattle1. Air seal, attic blow, mid floor d&amp;f2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. No</text_data><comment_date>2016-11-30T00:00:00</comment_date></row><row _id="row-aqv7_tg2g~f6tn" _uuid="00000000-0000-0000-794B-C5879E060398" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aqv7_tg2g~f6tn"><intent_id>611274</intent_id><project_id>725298</project_id><text_data>*West Coast Mfg is a fabrication shop only and does not require a contractor's license.**All work is performed off-site in shop at 1515 75th St Sw, Everett, WA.</text_data><comment_date>2014-01-08T00:00:00</comment_date></row><row _id="row-teya_mjck-iicx" _uuid="00000000-0000-0000-3E3B-3D1452041A08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-teya_mjck-iicx"><intent_id>952207</intent_id><project_id>869364</project_id><text_data>Filed by Linnie ShaverState of WA � Dept. of L&amp;I � Prevailing Wage DivisionPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1. What is the specific purpose of this awarding agency�s public works project? Provide control for the new variable frequency drives to the DDC system.2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No3. Does this specific project entail the remodeling or new construction of a facility?No.4. If your firm is working upon a type of building system, what type of system is involved?  HVAC control system5. When is your Work to be completed? Planning or preconstruction phase or during the public works project?During the project6. What specific tasks will your employees perform? Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.7. What, if any, tools will your employees use in the performance of those tasks?Laptop computer.8. If your employees will use no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No � none.9. Are you going to be hiring any subcontractors for this project?Yes.To expedite our evaluation, please be as detailed as possible in responding to these questions.  For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves.</text_data><comment_date>2018-12-26T00:00:00</comment_date></row><row _id="row-tsxi_9s4p-v6jm" _uuid="00000000-0000-0000-D56E-A0E9D1351C13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsxi_9s4p-v6jm"><intent_id>968369</intent_id><project_id>877043</project_id><text_data>PC6 - Job #6067PO 1008746CB</text_data><comment_date>2019-03-29T00:00:00</comment_date></row><row _id="row-6gfi~6zpi.xeqe" _uuid="00000000-0000-0000-FB42-5E6F8F9A9CB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6gfi~6zpi.xeqe"><intent_id>662870</intent_id><project_id>747663</project_id><text_data>All address are locate in the city of Tacoma.1.  Loraine Gregg    2521 South Cushman Ave,2.  Anges Beason    3529 North Bennett Street3.  George Ella Hinton    2345 South Wilkeson Street4.  Annie Frazier    1761 South 25th Street</text_data><comment_date>2014-10-28T00:00:00</comment_date></row><row _id="row-5trr-wh4q~5h97" _uuid="00000000-0000-0000-5C57-E9106EFBB48E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5trr-wh4q~5h97"><intent_id>980569</intent_id><project_id>881547</project_id><text_data>0819051</text_data><comment_date>2019-05-28T00:00:00</comment_date></row><row _id="row-bfad.wd9n-bvpp" _uuid="00000000-0000-0000-C1CF-3CAB0B8D53CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bfad.wd9n-bvpp"><intent_id>674643</intent_id><project_id>753593</project_id><text_data>SVC #423717</text_data><comment_date>2015-01-14T00:00:00</comment_date></row><row _id="row-a9hw_v83t.vni2" _uuid="00000000-0000-0000-8199-E30DB4C4F7A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a9hw_v83t.vni2"><intent_id>1017816</intent_id><project_id>897855</project_id><text_data>#1-Install Ductless Heat Pump; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2019-10-25T00:00:00</comment_date></row><row _id="row-aweq-nvhq-fgac" _uuid="00000000-0000-0000-6B1D-09A73B1CE58B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aweq-nvhq-fgac"><intent_id>1031437</intent_id><project_id>904436</project_id><text_data>Provide and install new pole at corner of Carlson and E Fourth Plain Blvd. per the revised drawings. Provide and install down-guy and pole hardware as shown on drawings.Provide and install 1.5� PVC conduit from existing junction box to new pole. Install 1.5� riser up pole and terminate with weather head.Provide and install new 3/8� galvanized steel messenger strand:Zhen Building to CPU Pole 667CPU Pole 667 to new CFCI pole.Provide and install pull line as shown on drawings.</text_data><comment_date>2020-01-13T00:00:00</comment_date></row><row _id="row-626t.nk2m_ts27" _uuid="00000000-0000-0000-FE92-7D769E1B6B22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-626t.nk2m_ts27"><intent_id>537091</intent_id><project_id>696869</project_id><text_data>Filed by Steve Mitchell</text_data><comment_date>2012-09-28T00:00:00</comment_date></row><row _id="row-abhe_ajzt_cju9" _uuid="00000000-0000-0000-857D-2AEAE73A304D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-abhe_ajzt_cju9"><intent_id>877446</intent_id><project_id>838636</project_id><text_data>Installing new microwave antenna link from Roosevelt High School to Cougar Mountain for KNHC FM radio.  Harrington Tower Services installed the actual antennas on the mount located on roof on Roosevelt High School and on the ATC Radio Tower on Cougar Mountain.  HTS Employees accessed correct level on both rooftop and tower, tools for attach were basic hand tools.</text_data><comment_date>2017-12-11T00:00:00</comment_date></row><row _id="row-ge7x_bw53_shij" _uuid="00000000-0000-0000-FAF5-E8F514FED8E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ge7x_bw53_shij"><intent_id>1235035</intent_id><project_id>1014085</project_id><text_data>9890059</text_data><comment_date>2022-05-19T00:00:00</comment_date></row><row _id="row-j5vf-8c4h.e37w" _uuid="00000000-0000-0000-0BB7-E42617A26DA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j5vf-8c4h.e37w"><intent_id>1213951</intent_id><project_id>997254</project_id><text_data>Jose Guerra-Castro, 101 S River St, Bucoda, WA 98530Mobile HOme Residence 2. Single family  3 single  4-8  Single family residence</text_data><comment_date>2022-02-25T00:00:00</comment_date></row><row _id="row-zxpr.dc7q-b2hk" _uuid="00000000-0000-0000-E7DA-40C67CD2B89C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxpr.dc7q-b2hk"><intent_id>946814</intent_id><project_id>859496</project_id><text_data>Source Electric LLC pays the fringe to IBEW Local 191.  The hourly fringe benefits are: Health &amp; Welfare 11.04/hr, Annuity Plan 2.25/hr, Pension 6.00/hr, NEBF 1.35/hr, LMCC &amp; NLMCC 0.12/hr, Apprenticeship 0.78/hr, Contract Admin Fund 0.20, &amp; NECA 0.20/hr.</text_data><comment_date>2018-11-20T00:00:00</comment_date></row><row _id="row-6buu-wpd5_3u4h" _uuid="00000000-0000-0000-1CB8-3812D2DDE9D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6buu-wpd5_3u4h"><intent_id>1115657</intent_id><project_id>946836</project_id><text_data>The pay cycle on our original intent (1027433) runs Wednesday through Tuesday.  We are switching to a Saturday through Friday pay cycle. Alia spoke with Joanna Walsh with LNI on 1/14/21 about how to make this transfer. We were instructed to close out the original intent and this new intent with the new pay cycle going forward.</text_data><comment_date>2021-01-15T00:00:00</comment_date></row><row _id="row-3qs5~ja8k_9k3f" _uuid="00000000-0000-0000-605B-D8C8F3E6EF26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3qs5~ja8k_9k3f"><intent_id>1491622</intent_id><project_id>1159247</project_id><text_data>Project# 05612, McGeorge, Brenda, 10614 E 6th Ave, Spokane Valley, WA 99206</text_data><comment_date>2024-12-03T00:00:00</comment_date></row><row _id="row-ks9t~ddc4~b9vc" _uuid="00000000-0000-0000-6ADD-035471F4748E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ks9t~ddc4~b9vc"><intent_id>625784</intent_id><project_id>733340</project_id><text_data>1- Weatherization/Construction2-single family dwelling3-single4-a)no  b)no  c)yes  d)no  e)no  f)no  g)no  h)no  I)no  j)no5-no6-no7-no8-no</text_data><comment_date>2014-04-21T00:00:00</comment_date></row><row _id="row-tif9_hgs3~yupm" _uuid="00000000-0000-0000-4525-768495E91D9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tif9_hgs3~yupm"><intent_id>1283859</intent_id><project_id>1041040</project_id><text_data>WO # 100111 Job # S1022</text_data><comment_date>2022-11-15T00:00:00</comment_date></row><row _id="row-dn26-qb94~n6vc" _uuid="00000000-0000-0000-AABC-056D5C248E9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dn26-qb94~n6vc"><intent_id>492696</intent_id><project_id>673386</project_id><text_data>We are a staffing agency and not 100% sure how long out employee will be out there so not sure of the contract amount.</text_data><comment_date>2011-12-08T00:00:00</comment_date></row><row _id="row-yw2t~7w7p~rvtd" _uuid="00000000-0000-0000-5347-1E82F6C1EC46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yw2t~7w7p~rvtd"><intent_id>921306</intent_id><project_id>852101</project_id><text_data>0618026</text_data><comment_date>2018-07-27T00:00:00</comment_date></row><row _id="row-i4yy.hbza~qxhd" _uuid="00000000-0000-0000-B1DF-98718B1AF3AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i4yy.hbza~qxhd"><intent_id>539445</intent_id><project_id>681159</project_id><text_data>Filed by Vladimir Lats</text_data><comment_date>2012-10-11T00:00:00</comment_date></row><row _id="row-d4q6-dwfh.dhps" _uuid="00000000-0000-0000-6055-2662F03EADDE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4q6-dwfh.dhps"><intent_id>499651</intent_id><project_id>678856</project_id><text_data>071061</text_data><comment_date>2012-02-08T00:00:00</comment_date></row><row _id="row-wzv2~6jqy.swnu" _uuid="00000000-0000-0000-6DBA-D32C60972347" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wzv2~6jqy.swnu"><intent_id>1160880</intent_id><project_id>968244</project_id><text_data>Job #202344</text_data><comment_date>2021-07-16T00:00:00</comment_date></row><row _id="row-iysd_cbvm_nnza" _uuid="00000000-0000-0000-EC31-C26613793CB4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iysd_cbvm_nnza"><intent_id>955552</intent_id><project_id>855245</project_id><text_data>Job #510626</text_data><comment_date>2019-01-16T00:00:00</comment_date></row><row _id="row-d5a5_nc7y.zfhn" _uuid="00000000-0000-0000-1CA1-947509E835EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d5a5_nc7y.zfhn"><intent_id>1076047</intent_id><project_id>927196</project_id><text_data>? Provide and install required cross connects and programming per request:o Roosevelt Building-? Provide and install C-4 clips on two existing voice cables.? Cross connect two digital phone lines.? Troubleshoot analog phone line. Identify good pair on customer owned backbone cable plant and verify with JDSU POTS test.</text_data><comment_date>2020-07-29T00:00:00</comment_date></row><row _id="row-ak3v_eph5_xcze" _uuid="00000000-0000-0000-1984-DAF12F445F90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ak3v_eph5_xcze"><intent_id>682892</intent_id><project_id>757254</project_id><text_data>Filed by John Stephens</text_data><comment_date>2015-03-10T00:00:00</comment_date></row><row _id="row-vwd9-gn4n-rpqm" _uuid="00000000-0000-0000-5EBB-041DA2F2E97B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vwd9-gn4n-rpqm"><intent_id>527385</intent_id><project_id>693459</project_id><text_data>Job # 172185</text_data><comment_date>2012-08-09T00:00:00</comment_date></row><row _id="row-jszh_x7h3.x4sb" _uuid="00000000-0000-0000-972F-0C5076A94F33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jszh_x7h3.x4sb"><intent_id>664480</intent_id><project_id>744679</project_id><text_data>Form filed by: Dana McGuire�Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the above crafts/trades/occupations.�</text_data><comment_date>2014-11-06T00:00:00</comment_date></row><row _id="row-ckme~p9pg-rmax" _uuid="00000000-0000-0000-E2D3-B28B6A98C4C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ckme~p9pg-rmax"><intent_id>1245793</intent_id><project_id>1010234</project_id><text_data>installation of soil, compost, and/or mulch. depths not to exceed 18'. installation and repair of existing irrigation system. depths not to exceed 24'. add mulch to impacted landscape beds and seed in grass areas. All installation by hand tool given the limited access.</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-einb-cak5.gevz" _uuid="00000000-0000-0000-130D-1CD2F280B2A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-einb-cak5.gevz"><intent_id>716314</intent_id><project_id>770642</project_id><text_data>Job # 8005785</text_data><comment_date>2015-08-24T00:00:00</comment_date></row><row _id="row-5vpf_ztdv-ecv6" _uuid="00000000-0000-0000-12D4-5B71B933BE54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vpf_ztdv-ecv6"><intent_id>1193395</intent_id><project_id>960498</project_id><text_data>We pay 100% Employee Health Premiums as part of Fringe //CCThis is a Housing Act of 1937 project per 24 CFR 965.101 and is exempt from the state prevailing wage rates but not exempt from the application of other prevailing wage requirements under the Washington State laws, rules and policies.</text_data><comment_date>2021-11-15T00:00:00</comment_date></row><row _id="row-2thv-k4sj~9mgg" _uuid="00000000-0000-0000-F659-6654183ED882" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2thv-k4sj~9mgg"><intent_id>1132095</intent_id><project_id>951970</project_id><text_data>A - Flood damaged road repair. B � Asphalt paving.C � General Laborer � General asphalt work on project.</text_data><comment_date>2021-04-06T00:00:00</comment_date></row><row _id="row-cqx2~uggj.7k27" _uuid="00000000-0000-0000-4A90-00D1E6A2B648" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqx2~uggj.7k27"><intent_id>643213</intent_id><project_id>738216</project_id><text_data>job# 21837</text_data><comment_date>2014-07-24T00:00:00</comment_date></row><row _id="row-e2fg-35fm~a7yv" _uuid="00000000-0000-0000-D0DD-253193198B49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e2fg-35fm~a7yv"><intent_id>752039</intent_id><project_id>787507</project_id><text_data>Plumbing @ 609 Queen Ave for Carol M Brown//Invoice ARS007589// #1  Ran new one inch water line from meter to house.  Rerouted line through crawl space.  Installed 3/4 ball valve by water heater.  Hauled off debris and supplied 5/8 minus.  2. Single family  3. single story  4. a. N  b. N  c. Y  d. N e. N  f. N g. N  h. N I. N  j. N  k. N  l.  N  #5 Yes  #6  Yes  #7 N  #8 N.</text_data><comment_date>2016-03-17T00:00:00</comment_date></row><row _id="row-2ezp~xeq9-mer8" _uuid="00000000-0000-0000-B0B1-9C90CDADF772" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ezp~xeq9-mer8"><intent_id>1073920</intent_id><project_id>893149</project_id><text_data>Stoneway Concrete is a Supplier</text_data><comment_date>2020-07-21T00:00:00</comment_date></row><row _id="row-5c3f.mmi5-n5q2" _uuid="00000000-0000-0000-EA87-390C10112D62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5c3f.mmi5-n5q2"><intent_id>508146</intent_id><project_id>686115</project_id><text_data>Sent email:  On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2013-01-16T00:00:00</comment_date></row><row _id="row-brra~56c2.vsv8" _uuid="00000000-0000-0000-B9BA-174647621762" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brra~56c2.vsv8"><intent_id>969410</intent_id><project_id>877498</project_id><text_data>#1 � The crew will be installing a ductless heat pump.#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2019-04-03T00:00:00</comment_date></row><row _id="row-mmge-mz4e_c6v3" _uuid="00000000-0000-0000-B7B9-E130EEBAEAD3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mmge-mz4e_c6v3"><intent_id>809529</intent_id><project_id>798631</project_id><text_data>Dear Jennifer Clarke: Thank you for your internet inquiry dated September 30,2015. Regarding filing an intent and affidavit for prevailing wages.Question:American Transport was hired by Canan Group to pick up trusses form AZ and deliver them to Renton, WA My owner operator transported the trusses to a public works facility, now we need to file an intent and affidavit for prevailing wages. This paperwork is looking for my Owner Operators UBI # which they do not have. Are you able to provide documentation that my owner operators are not required to have a UBI#? This was a onetime transportation lane for them and rarely do they enter the state of WA.Response:It does not appear that American Transport needs to be registered for tax purposes.However American Transport should contact the department of Labor and Industries to see if that agency requires them to register for their purposes. WE recommend you call Laura Herman at L&amp;I. She is a prevailing wage specialist. You can contact her 3604163047.you can also contact L&amp;I by; Calling their prevailing wage group toll free at 1-855-545-8163 or emailing them at PW1@lni.wa.govSincerely Beth Mills</text_data><comment_date>2017-01-03T00:00:00</comment_date></row><row _id="row-889b_fqsx.wb6r" _uuid="00000000-0000-0000-CDCF-CA8BB7802CB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-889b_fqsx.wb6r"><intent_id>1146520</intent_id><project_id>955245</project_id><text_data>Job 461</text_data><comment_date>2021-05-21T00:00:00</comment_date></row><row _id="row-z9ex~wmdk~u3i6" _uuid="00000000-0000-0000-61A4-9081B44886C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z9ex~wmdk~u3i6"><intent_id>900731</intent_id><project_id>846274</project_id><text_data>1 drain cleaning 2 single 3 n/a 4a no b no c yes d no e no f no g no h no i no j no k no 5 yes 6 yes 7 no 8 no</text_data><comment_date>2018-04-25T00:00:00</comment_date></row><row _id="row-ruhf-3rzb.ui8x" _uuid="00000000-0000-0000-8A4A-984943B16C80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ruhf-3rzb.ui8x"><intent_id>1038656</intent_id><project_id>823535</project_id><text_data>Health &amp; Security - $8.07Pension - $12.40Apprenticeship training - $0.70National Training - $0.05Contract Admin - $0.04</text_data><comment_date>2020-02-14T00:00:00</comment_date></row><row _id="row-nvwb-xy2w~tnjh" _uuid="00000000-0000-0000-EF65-6739F82C36E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nvwb-xy2w~tnjh"><intent_id>795669</intent_id><project_id>804828</project_id><text_data>WO 8016158</text_data><comment_date>2016-10-13T00:00:00</comment_date></row><row _id="row-awcf_2tr5-kwsg" _uuid="00000000-0000-0000-7C45-573F275C42A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-awcf_2tr5-kwsg"><intent_id>749378</intent_id><project_id>786357</project_id><text_data>1)We were contracted to repair a gas furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2016-03-02T00:00:00</comment_date></row><row _id="row-mpwm.f5tk-c2x6" _uuid="00000000-0000-0000-56D7-209BCEC4124A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpwm.f5tk-c2x6"><intent_id>745890</intent_id><project_id>784728</project_id><text_data>Nordic Project # 16907</text_data><comment_date>2016-02-12T00:00:00</comment_date></row><row _id="row-zecr-ua2a~uvyw" _uuid="00000000-0000-0000-C495-9258E70F4D5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zecr-ua2a~uvyw"><intent_id>945890</intent_id><project_id>866511</project_id><text_data>Filed by Robert L Clark</text_data><comment_date>2018-11-14T00:00:00</comment_date></row><row _id="row-uary-dvuj.nx8i" _uuid="00000000-0000-0000-E1CB-0814E2973680" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uary-dvuj.nx8i"><intent_id>877170</intent_id><project_id>814590</project_id><text_data>Filed by Chelsy Boyd</text_data><comment_date>2017-12-01T00:00:00</comment_date></row><row _id="row-bkuk~rdaa_b4n7" _uuid="00000000-0000-0000-2924-482269F63290" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bkuk~rdaa_b4n7"><intent_id>635255</intent_id><project_id>729262</project_id><text_data>1213 Garfield ave Yakima,wa 98902 1. install bath fan 2. single family house 3. 1 level 4. a. no b. no c. yes d. no e. no f. no g. no h. no I. no j. no k .no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2014-06-16T00:00:00</comment_date></row><row _id="row-vxzt-9522_azte" _uuid="00000000-0000-0000-4CF1-C05CC4F1E59C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vxzt-9522_azte"><intent_id>1125138</intent_id><project_id>928920</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2021-02-26T00:00:00</comment_date></row><row _id="row-xzbt.qtb5~bp4y" _uuid="00000000-0000-0000-4727-AB80811FE121" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xzbt.qtb5~bp4y"><intent_id>1318473</intent_id><project_id>1062645</project_id><text_data>9914623</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-yww7.yipr~af36" _uuid="00000000-0000-0000-B8FE-BB6B77573639" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yww7.yipr~af36"><intent_id>691591</intent_id><project_id>759982</project_id><text_data>Scope of work: hand dig planting holes to maximum depth of 12 inches, amend native soil in planting holes with compost, plant 400 plants varying in sized from bare root live stakes to 1 gallon plants mulch around new plants with wood chips to depth of 4 inchesTools to be used: shovels, rakes, wheelbarrows</text_data><comment_date>2015-04-29T00:00:00</comment_date></row><row _id="row-3jhg_kf77~wshg" _uuid="00000000-0000-0000-8C1A-AB3A29E47025" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3jhg_kf77~wshg"><intent_id>1243290</intent_id><project_id>1018719</project_id><text_data>Remove the existing panel antennas and install City-provided Comprod 799-70R160 antennas. Optimize coverage and reception of the antennas by shifting the orientation of the azimuths.</text_data><comment_date>2022-06-22T00:00:00</comment_date></row><row _id="row-fr84-uwqu~eexy" _uuid="00000000-0000-0000-F873-823B337F8952" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fr84-uwqu~eexy"><intent_id>604147</intent_id><project_id>705889</project_id><text_data>Oregon company with employees reportable to oregon</text_data><comment_date>2013-11-12T00:00:00</comment_date></row><row _id="row-4hpt~2pdx-ujru" _uuid="00000000-0000-0000-D0BD-657DC4A94E8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4hpt~2pdx-ujru"><intent_id>1289155</intent_id><project_id>1021687</project_id><text_data>301FNM0461 - Intent</text_data><comment_date>2022-12-12T00:00:00</comment_date></row><row _id="row-5tz5~hj7h_qp93" _uuid="00000000-0000-0000-D33F-9D144FF51632" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5tz5~hj7h_qp93"><intent_id>634987</intent_id><project_id>711094</project_id><text_data>Form filed by: Eddie Ford</text_data><comment_date>2014-06-13T00:00:00</comment_date></row><row _id="row-3hrt_4bzr_63qs" _uuid="00000000-0000-0000-A3EC-4564B305F0D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3hrt_4bzr_63qs"><intent_id>1247432</intent_id><project_id>1021075</project_id><text_data>1-Replace HVAC, 2-single family, 3-1, 4-living, a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, 5-no, 6-no, 7-yes, 8-no</text_data><comment_date>2022-07-08T00:00:00</comment_date></row><row _id="row-ajd3.m2fb-894v" _uuid="00000000-0000-0000-D127-F8673DE50198" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ajd3.m2fb-894v"><intent_id>1187027</intent_id><project_id>984488</project_id><text_data>sr43769516</text_data><comment_date>2021-10-20T00:00:00</comment_date></row><row _id="row-ve88_bkgf-jhp6" _uuid="00000000-0000-0000-CDFA-927B99D674A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ve88_bkgf-jhp6"><intent_id>1288797</intent_id><project_id>1043958</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. BCI Project No. GA2083Filed by Kathi Clark</text_data><comment_date>2022-12-09T00:00:00</comment_date></row><row _id="row-qr68_wd2f.4i6z" _uuid="00000000-0000-0000-C742-FA3F887B380B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qr68_wd2f.4i6z"><intent_id>817050</intent_id><project_id>813931</project_id><text_data>Labor to install 2 each BH-1776S, 10-5/8&amp;quot; leak sealer pkg kits on Weaver EC10516-B0024 lift, re-inspect and pass failed lift.  See Equipment Sales Co., invoice #10482 dated 2/7/17.  Used ESC company vehicle to travel from Snohomish, WA to Ellensburg, WA.</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-eid9.6sv7.mm8m" _uuid="00000000-0000-0000-7EAF-42DCE635277B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eid9.6sv7.mm8m"><intent_id>1103443</intent_id><project_id>939959</project_id><text_data>inv # 3004962485</text_data><comment_date>2020-11-14T00:00:00</comment_date></row><row _id="row-mwns_tgqm~fchz" _uuid="00000000-0000-0000-EF2C-3DE831A5ACA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mwns_tgqm~fchz"><intent_id>836404</intent_id><project_id>822686</project_id><text_data>Please disregard prior notes.client called and said sand media was entering the pool after they turned on the filters.  We shipped in RED the internal laterals and changed schedule to arrive on site ASAP.  we closed all flow the the filters and opened up the filters and removed the sand media via hand, shovel and shop vac.  found blown out end of lateral and blown out main pipe interanally blown out. this is only caused by water hammer when the system is turned on to fast and hard.  need to turn on slowly release all internal air pressure.  we showed client the water hammer damage.  replaced the broken internals, replaced the sand media, and turned the filter system on correctly.</text_data><comment_date>2017-05-25T00:00:00</comment_date></row><row _id="row-qeed.vnc7.cyun" _uuid="00000000-0000-0000-FB98-C2DF363533EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qeed.vnc7.cyun"><intent_id>628375</intent_id><project_id>734450</project_id><text_data>Several manufactured homes within the town of Othello		#1 - Heating duct sealing. #2 - Single family manufactured home? #3 - 1 level? #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2014-05-07T00:00:00</comment_date></row><row _id="row-5k2n.vm8d~hxeq" _uuid="00000000-0000-0000-7891-18C98A674B39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5k2n.vm8d~hxeq"><intent_id>453086</intent_id><project_id>663768</project_id><text_data>WSP Tukwila Office</text_data><comment_date>2011-04-26T00:00:00</comment_date></row><row _id="row-2qvj-8qf4~bdks" _uuid="00000000-0000-0000-057B-15674F112AB0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2qvj-8qf4~bdks"><intent_id>817640</intent_id><project_id>798268</project_id><text_data>The rest of the fringe will be paid in cash $17.89.</text_data><comment_date>2017-06-20T00:00:00</comment_date></row><row _id="row-usua_f5rg-i8ad" _uuid="00000000-0000-0000-C6F6-FD8B71D62B77" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-usua_f5rg-i8ad"><intent_id>662011</intent_id><project_id>747320</project_id><text_data>landscape construction</text_data><comment_date>2014-10-23T00:00:00</comment_date></row><row _id="row-iqr9.y5xp~mvwc" _uuid="00000000-0000-0000-686E-807FDDC16CBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iqr9.y5xp~mvwc"><intent_id>774035</intent_id><project_id>796691</project_id><text_data>Telecom Tech(09)Indoor WorkLAN(Local Area Network)TelephoneBits and Bytes</text_data><comment_date>2016-07-12T00:00:00</comment_date></row><row _id="row-w78p~sznm~d98i" _uuid="00000000-0000-0000-1BF0-E96FE2EE945B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w78p~sznm~d98i"><intent_id>803904</intent_id><project_id>807893</project_id><text_data>Vine Maple Lane, Camano Island1. Air seal, attic blow, duct seal, belly blow2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. No</text_data><comment_date>2016-11-22T00:00:00</comment_date></row><row _id="row-kzue~nreh-npzv" _uuid="00000000-0000-0000-9660-70586EBF7E96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kzue~nreh-npzv"><intent_id>1203352</intent_id><project_id>994365</project_id><text_data>MOBILE HOME INSULATION #1 - Describe the work that your firm was contracted to perform. MOBILE HOME INSULATION#2 - Is the structure a single-family dwelling, duplex, apartment, condominium, or other residential structure? YES#3 - Including any basement or garage, how many stories or levels does the structure have? ONE#4 - What is the building used for? PRIMARY RESIDENCE Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(I) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on-site? NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2022-01-07T00:00:00</comment_date></row><row _id="row-wsj2_myat_gerc" _uuid="00000000-0000-0000-7647-98FC5C1F9A4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wsj2_myat_gerc"><intent_id>519222</intent_id><project_id>690519</project_id><text_data>Form filed by: Shawn Wilks</text_data><comment_date>2012-06-27T00:00:00</comment_date></row><row _id="row-km47~zx6d~5tmw" _uuid="00000000-0000-0000-7964-D64DE5025E30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-km47~zx6d~5tmw"><intent_id>623762</intent_id><project_id>731407</project_id><text_data>See notes above</text_data><comment_date>2014-04-29T00:00:00</comment_date></row><row _id="row-cusr.hgsg_wfc5" _uuid="00000000-0000-0000-4DD2-04C5CA100468" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cusr.hgsg_wfc5"><intent_id>553287</intent_id><project_id>701264</project_id><text_data>roadside planting, soil/bark/compost installation.  Mini-excavator, skid-steer frontloader (bobcat), wheel barrow, small power and hand tools.</text_data><comment_date>2013-02-01T00:00:00</comment_date></row><row _id="row-7cxi-ngi8-36wv" _uuid="00000000-0000-0000-4247-B0AA2AF35D8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7cxi-ngi8-36wv"><intent_id>754434</intent_id><project_id>788104</project_id><text_data>Indoor and outdoor workTelecom Tech(09) and Elect Tech(06)LAN(Local Area Network)Bits and BytesTelephone</text_data><comment_date>2016-04-01T00:00:00</comment_date></row><row _id="row-vtm5-fdv9.kuy8" _uuid="00000000-0000-0000-8C55-1914A7E1FA17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vtm5-fdv9.kuy8"><intent_id>495612</intent_id><project_id>680817</project_id><text_data>The scope of work for this project is to provide and install voice and data cable</text_data><comment_date>2012-01-04T00:00:00</comment_date></row><row _id="row-n6n6~vwjr-7grh" _uuid="00000000-0000-0000-A7C8-BD1ED68F5BD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n6n6~vwjr-7grh"><intent_id>497379</intent_id><project_id>681566</project_id><text_data>Repairs to the roof system.  Installation of a new roofing cricket and water diverter.</text_data><comment_date>2012-01-19T00:00:00</comment_date></row><row _id="row-tzs8_3eii~zbym" _uuid="00000000-0000-0000-C2AE-7BD52EB8EEFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzs8_3eii~zbym"><intent_id>1204374</intent_id><project_id>995038</project_id><text_data>This was a water loss water damned the roof drain and came into the Bldg. Our General Laborer�s set Air Movers and Dehumidifiers to stabilize the water intrusion. Also, we remove wet bldg. Materials that where wet and used hand tools. Material removed flooring, drywall, Insulation, and acoustical tiles all asbestos free.</text_data><comment_date>2022-02-01T00:00:00</comment_date></row><row _id="row-zmwk~jyap_8bmh" _uuid="00000000-0000-0000-C1C2-8D996BD59890" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zmwk~jyap_8bmh"><intent_id>739418</intent_id><project_id>781599</project_id><text_data>Remove one drum from the riverHazWaste Workers to remove drum floating in river and dispose</text_data><comment_date>2015-12-29T00:00:00</comment_date></row><row _id="row-5vmz~ntrr.pyvt" _uuid="00000000-0000-0000-33F6-388F16E96A12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vmz~ntrr.pyvt"><intent_id>1104529</intent_id><project_id>940565</project_id><text_data>1606525</text_data><comment_date>2020-11-19T00:00:00</comment_date></row><row _id="row-sudj.rtji_9ifn" _uuid="00000000-0000-0000-B9E7-0853C1A00AC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sudj.rtji_9ifn"><intent_id>1155802</intent_id><project_id>946178</project_id><text_data>Stoneway Concrete is a Supplier</text_data><comment_date>2021-06-25T00:00:00</comment_date></row><row _id="row-2s86-pbmd.anyy" _uuid="00000000-0000-0000-A163-EF71714DB391" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2s86-pbmd.anyy"><intent_id>538601</intent_id><project_id>697396</project_id><text_data>Softball infield rework, Removal of sod baseline to backstopTopDress with red cinder sand -foul areasEarthquake all of infieldPreseed</text_data><comment_date>2012-10-08T00:00:00</comment_date></row><row _id="row-px6r-473i-w3dv" _uuid="00000000-0000-0000-7F40-6E5CC1B2AB82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-px6r-473i-w3dv"><intent_id>1419080</intent_id><project_id>1120103</project_id><text_data>9941442</text_data><comment_date>2024-04-14T00:00:00</comment_date></row><row _id="row-e4bg-x8js-xt8w" _uuid="00000000-0000-0000-AD75-349B42085175" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e4bg-x8js-xt8w"><intent_id>498816</intent_id><project_id>682103</project_id><text_data>Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor).  To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures.  Please note that an on-call/blanket/annual contract may not be utilized for construction projects or for warranty work as these require their own set of Intent and forms with the appropriate bid and award dates associated with those specific contracts.  The use of on-call/blanket/annual contracts is limited to maintenance and repair work.  If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work.On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out.  (RCW 39.12.040)We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.  A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp(chrr235)</text_data><comment_date>2012-02-24T00:00:00</comment_date></row><row _id="row-uybk.56r5.wmfg" _uuid="00000000-0000-0000-A0E6-6CF0E57AD1A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uybk.56r5.wmfg"><intent_id>553611</intent_id><project_id>699699</project_id><text_data>&amp;quot;Other Trucks&amp;quot; - 1 water truck and 1 truck for equipment mobilization (either a dump truck pulling a tilt trailer or a tractor truck pulling a lowboy trailer)</text_data><comment_date>2013-01-30T00:00:00</comment_date></row><row _id="row-dqxv_7kiw_uihs" _uuid="00000000-0000-0000-61AC-2937E62A050B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dqxv_7kiw_uihs"><intent_id>833028</intent_id><project_id>820164</project_id><text_data>general labor work consists of hand work(shovel work) no power equipment or power tools.  blade operator is used for grading the project site for compaction before paving operations. other trucks consist of the following: 1)  One (1) 0-8,000 gallon water truck used for distribution of water during the grading process to help with compaction. $34.38(base) + $8.60(fringe) 2)  Oil distributor is used for distribution of oil during chip sealing operations.      $34.19 (base) + $8.80(fringe)</text_data><comment_date>2017-05-15T00:00:00</comment_date></row><row _id="row-atc9~uwkr.5n3q" _uuid="00000000-0000-0000-5AD3-F9F05A736B99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-atc9~uwkr.5n3q"><intent_id>1163719</intent_id><project_id>969462</project_id><text_data>Telecommunications Cabling, voice/ data and fiber optic cabling for the schools internal cabling system. Telephone cabling. Fiber optic cabling. All cabling inside building structure.</text_data><comment_date>2021-07-27T00:00:00</comment_date></row><row _id="row-9f2k.yey6_ibtf" _uuid="00000000-0000-0000-A087-E3C5AFF0D292" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9f2k.yey6_ibtf"><intent_id>1036220</intent_id><project_id>907149</project_id><text_data>#20717, Larson, Tamara, 1323 E Thurston, Spokane</text_data><comment_date>2020-02-28T00:00:00</comment_date></row><row _id="row-s3kf-5cjq.ib4w" _uuid="00000000-0000-0000-A71B-BD7F8F8919E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s3kf-5cjq.ib4w"><intent_id>488188</intent_id><project_id>661785</project_id><text_data>2 journeyman and 3 apprentices</text_data><comment_date>2011-11-08T00:00:00</comment_date></row><row _id="row-pqmf~n4wm_b5ph" _uuid="00000000-0000-0000-2CD3-343AD8A455D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqmf~n4wm_b5ph"><intent_id>978126</intent_id><project_id>792683</project_id><text_data>Side dump/belly dump hauling native soil or rock products.</text_data><comment_date>2019-05-15T00:00:00</comment_date></row><row _id="row-kv98~2uyi-suut" _uuid="00000000-0000-0000-CAEC-90632BB09FF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kv98~2uyi-suut"><intent_id>812658</intent_id><project_id>811941</project_id><text_data>Install Data Cable inside of school</text_data><comment_date>2017-01-25T00:00:00</comment_date></row><row _id="row-h49a_7p4g~t6qj" _uuid="00000000-0000-0000-21C9-F44B0941B32B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h49a_7p4g~t6qj"><intent_id>1152943</intent_id><project_id>966862</project_id><text_data>7024801</text_data><comment_date>2021-06-16T00:00:00</comment_date></row><row _id="row-cpar~h7e3.mtu2" _uuid="00000000-0000-0000-1A41-2B777A7AEE8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cpar~h7e3.mtu2"><intent_id>853910</intent_id><project_id>824486</project_id><text_data>Installation of topsoil, plants and mulch. All work will be performed with hand tools by laborers. Any truck driving or heavy machinery will be performed by owner/operator.</text_data><comment_date>2017-08-09T00:00:00</comment_date></row><row _id="row-wvk2.k82j-u7r9" _uuid="00000000-0000-0000-477E-5DC420E8DBD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wvk2.k82j-u7r9"><intent_id>782590</intent_id><project_id>792407</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK &amp;quot;POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)&amp;quot; USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2016-08-16T00:00:00</comment_date></row><row _id="row-3uiu-wuqd-ffyy" _uuid="00000000-0000-0000-6398-A18FA525FE2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3uiu-wuqd-ffyy"><intent_id>849935</intent_id><project_id>822014</project_id><text_data>Michels portion of the project is to install a cured in place liner into existing sanitary and storm sewer lines without digging them up - no excavation.  Michels to perform all work through existing manholes.  Will use pickup, flatbed, and specialized installation equipment</text_data><comment_date>2017-07-25T00:00:00</comment_date></row><row _id="row-kvr2_jzg4_8zmz" _uuid="00000000-0000-0000-3E64-BE53DB452B27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvr2_jzg4_8zmz"><intent_id>489735</intent_id><project_id>678433</project_id><text_data>HVAC PM Maintenance Intent.  Affidavits for each project to follow.</text_data><comment_date>2011-11-17T00:00:00</comment_date></row><row _id="row-svyh.zxtp~vxk2" _uuid="00000000-0000-0000-F42A-4E9DBC7A3B35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-svyh.zxtp~vxk2"><intent_id>890907</intent_id><project_id>844953</project_id><text_data>#1) Gas furnace continues to blow cold air - Ongoing since December.#2) Residential Structure.#3) One.#4) a) No b) No  c) No d) No e) No f) No g) No h) No i) No j) No k) No l) No#5) Single Family Home.#6) Single Family Home.#7) No.#8) No.</text_data><comment_date>2018-03-02T00:00:00</comment_date></row><row _id="row-gw2q~qj8u~4mav" _uuid="00000000-0000-0000-29B2-9632513A8499" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gw2q~qj8u~4mav"><intent_id>1219980</intent_id><project_id>1005002</project_id><text_data>240189 - ILALKO ELEM. PORTABLE HEAT PUMP REPLACE.</text_data><comment_date>2022-03-22T00:00:00</comment_date></row><row _id="row-6iwq-pi99.egsr" _uuid="00000000-0000-0000-DD1B-6088B3B7A656" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6iwq-pi99.egsr"><intent_id>474634</intent_id><project_id>671657</project_id><text_data>Trucks to be used are the semi-truck and trailer to haul rolloff bins and the semi-truck and trailer 10 wheeler vacuum tanker to be used for rolloff bins at the job site.</text_data><comment_date>2011-08-26T00:00:00</comment_date></row><row _id="row-wu86.njev_pdu6" _uuid="00000000-0000-0000-A940-6E807E7A76AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wu86.njev_pdu6"><intent_id>448806</intent_id><project_id>561341</project_id><text_data>Scope of work for this consist soley of planting of trees and shrubs, and isntalling 2 inches of bark mulch</text_data><comment_date>2011-03-28T00:00:00</comment_date></row><row _id="row-nmtx~r2xx_a8f3" _uuid="00000000-0000-0000-107A-0F612CF2A241" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nmtx~r2xx_a8f3"><intent_id>955808</intent_id><project_id>870275</project_id><text_data>Other Trucks= water trucks to keep dust low.</text_data><comment_date>2019-01-17T00:00:00</comment_date></row><row _id="row-g5bg~2sx7_rpu5" _uuid="00000000-0000-0000-020E-F94859CEABEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g5bg~2sx7_rpu5"><intent_id>1007054</intent_id><project_id>893232</project_id><comment_date>2019-09-13T00:00:00</comment_date></row><row _id="row-8ecf~4prh~373e" _uuid="00000000-0000-0000-6879-BB26FBF4E613" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ecf~4prh~373e"><intent_id>668106</intent_id><project_id>749916</project_id><text_data>I apologize, This fringe amount of $51.54 was typed in error. It should have read $21.54. Here&amp;#39;s the breakdown: Health &amp; Welfare of $9.01, Washington State Pension of $4.56, Supplemental Pension of $4.00, National Pension of $2.49, JATC of $1.38, and International Training Fund of $.10</text_data><comment_date>2014-12-04T00:00:00</comment_date></row><row _id="row-r54p.24jp-6a6e" _uuid="00000000-0000-0000-9B5F-7FA7AD9B032A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r54p.24jp-6a6e"><intent_id>802040</intent_id><project_id>804895</project_id><text_data>Job # 109765-001</text_data><comment_date>2016-11-17T00:00:00</comment_date></row><row _id="row-pst9.mbhc.6xbb" _uuid="00000000-0000-0000-084D-89978C932760" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pst9.mbhc.6xbb"><intent_id>1118143</intent_id><project_id>898854</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2021-02-24T00:00:00</comment_date></row><row _id="row-52ws~5irm~awbb" _uuid="00000000-0000-0000-324F-6A2F929146EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-52ws~5irm~awbb"><intent_id>972565</intent_id><project_id>878863</project_id><text_data>Install cables that can be used for either telephone(Voice over Distance) or data(bitsand bytes) connection within the telecommunications system. All work to be performedindoors.</text_data><comment_date>2019-04-18T00:00:00</comment_date></row><row _id="row-y7dw~qci8_iyhu" _uuid="00000000-0000-0000-2B79-C3405CE667D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y7dw~qci8_iyhu"><intent_id>474351</intent_id><project_id>673056</project_id><text_data>OTHER TRUCK - WATER TANK TRUCK - WILL SPRAY THE ROAD WITH WATER TO HELP CONTROL DUSTOTHER TRUCK - OIL DISTRIBUTOR - WILL SPRAY THE ROAD WITH OIL BEFORE THE ASPHALT GOES DOWN.GENERAL LAOBRER - CARRY FORMS ,TOOLS, CLEAR ANY DEBRIS,</text_data><comment_date>2011-08-25T00:00:00</comment_date></row><row _id="row-cug2.834n~37nd" _uuid="00000000-0000-0000-0810-1A4D518A5023" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cug2.834n~37nd"><intent_id>1002228</intent_id><project_id>891271</project_id><text_data>Filed By Gary Burgess</text_data><comment_date>2019-08-23T00:00:00</comment_date></row><row _id="row-87ru-iz6t.htaj" _uuid="00000000-0000-0000-D406-F61D8DF35973" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87ru-iz6t.htaj"><intent_id>744001</intent_id><project_id>783822</project_id><text_data>The customer provides the crew including Lineman to work with our Groundperson.</text_data><comment_date>2016-02-08T00:00:00</comment_date></row><row _id="row-w8sp~gq8y~ethh" _uuid="00000000-0000-0000-E7FA-C28E4E14A099" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w8sp~gq8y~ethh"><intent_id>781253</intent_id><project_id>793522</project_id><text_data>Surface runways and high jump</text_data><comment_date>2016-08-10T00:00:00</comment_date></row><row _id="row-mw2c-fpp5~3dxn" _uuid="00000000-0000-0000-1829-E18C15C21B22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mw2c-fpp5~3dxn"><intent_id>669963</intent_id><project_id>731634</project_id><text_data>Form filed by: Keith Brown1.	What is the specific purpose of this awarding agency�s public works project? Examples are:  Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc. � New force sewer main2.	Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See  WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)] � Our portion of the project involves providing soil and geologic engineering3.	Does this specific project entail the remodeling or new construction of a facility?  - I believe it is new construction.4.	If your firm is working upon a type of building system, what type of system is involved?  Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc. � We are providing engineering information5.	What specific tasks will your employees perform?  - Electric cone penetrometer testing6.	What, if any, tools will your employees use in the performance of those tasks? � Electric cone penetrometer and related equipment.7.	If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? N/A8.	Are you going to be hiring any subcontractors for this project? � No subcontractors will be hired by us.Completed by Keith Brown, PE 360-568-2807</text_data><comment_date>2014-12-16T00:00:00</comment_date></row><row _id="row-mmcn~qiii.xwud" _uuid="00000000-0000-0000-FEB7-1DFC9008E7F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mmcn~qiii.xwud"><intent_id>1317492</intent_id><project_id>1062072</project_id><text_data>Employee to use hand tools (shovel/rake/broom)</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-z9q8_2aga~ymrq" _uuid="00000000-0000-0000-1AB6-EAF3A5A4E24B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z9q8_2aga~ymrq"><intent_id>862081</intent_id><project_id>832333</project_id><text_data>From: Ziegert, Charles O (LNI) Sent: Monday, April 23, 2018 2:07 PMTo: &amp;#39;info@emtech.us&amp;#39; &amp;lt;info@emtech.us&amp;gt;Subject: Intent 862081 On-Call ContractGood afternoon,On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on--call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.aspThank you,Chuck ZiegertIndustrial Relations AgentCharles.Ziegert@lni.wa.govPrevailing WageDept of Labor and IndustriesPhone 360 902-4538Prevailing Wage 360 902-5335Prevailing Wage Information:http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp</text_data><comment_date>2018-04-23T00:00:00</comment_date></row><row _id="row-uzr3-3cbt_rijm" _uuid="00000000-0000-0000-484C-15167AD587A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzr3-3cbt_rijm"><intent_id>687745</intent_id><project_id>759395</project_id><text_data>Job # 20129-001 CGC # C10308</text_data><comment_date>2015-04-07T00:00:00</comment_date></row><row _id="row-ugtf_4t4h.xvgv" _uuid="00000000-0000-0000-26FC-839311593FD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ugtf_4t4h.xvgv"><intent_id>938789</intent_id><project_id>839876</project_id><text_data>Other Truck - Water TruckOther Truck - Lowboy low bed heavy duty trailer</text_data><comment_date>2018-10-10T00:00:00</comment_date></row><row _id="row-zi72.agyy_5mqi" _uuid="00000000-0000-0000-3817-E0C90D5716F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zi72.agyy_5mqi"><intent_id>764010</intent_id><project_id>792769</project_id><text_data>Prime Contractor-Tub Cove Inc.-7801 Lake City Way Ne-Seattle Wa 98115Awarding Agency-Snohomish County Housing Authority-address/contact info on IntentWork Description: Remove old bathtub, valve and tub surround. Install new bathtub, valve and one piece laminate tub surroundStructure is a residential apartment. a single family dwellingEach building has 4 apartments on two levels. There are two lower units on the ground level  and two upper units above them. Buildings are used for single family dwellingsAnswer yes or no- A) No- commercial us in structure b) No-retail use in structure c) No- Permanent Residence d)No not a rehab house e) No- This is not transitional housing f) No- communal dining facility g) No treatment services h) No-not assisted living I) No-These are not dormitories J) No- not a counseling center k) No- Separate room/bed rental L) No- other services/uses m) Yes-each unit has its own self contained kitchen n)Yes-each dwelling has its own bathroom o) Yes- there is a managers office onsite p) No part of the apartment buildings are used by the general public.</text_data><comment_date>2016-05-24T00:00:00</comment_date></row><row _id="row-wqgk-vypq.3hq9" _uuid="00000000-0000-0000-6155-7C81AE310B9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wqgk-vypq.3hq9"><intent_id>765201</intent_id><project_id>763163</project_id><text_data>The project includes renovation/remodeling and new construction of an elementary school. Our part consists of installing irrigation (trenches to 18&amp;quot;). Installing topsoil and mulch products. Installing plants and hydroseeding and sodding lawn.</text_data><comment_date>2016-05-31T00:00:00</comment_date></row><row _id="row-2yz2-w447-2kqh" _uuid="00000000-0000-0000-E76F-C2C605D0B341" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2yz2-w447-2kqh"><intent_id>570313</intent_id><project_id>586627</project_id><text_data>RAMON MIRELES 300531-6711201 W WASHINGTON AVE #$116YAKIMA, WA 98903509-930-8882</text_data><comment_date>2013-05-17T00:00:00</comment_date></row><row _id="row-k4ws~m85e-jb4d" _uuid="00000000-0000-0000-56DA-B858A01C713F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k4ws~m85e-jb4d"><intent_id>1287667</intent_id><project_id>1043360</project_id><text_data>ISH wants us to keep all emergency phones in a similar appearance in the elevator lobbies.  Move the cat 6 cable they installed for the emergency wall phone in the lower level up to wall phone height, like the other ones they installed.  Please use Cost Code 33100-1400 and have the CTS tech contact me when onsite.  They should be able to just cut in a new box directly above where it is located now. Facilities plans to move the furniture to the right to give access to the emergency wall phone.</text_data><comment_date>2022-12-05T00:00:00</comment_date></row><row _id="row-x557_86mx~jnsy" _uuid="00000000-0000-0000-B359-F01FE2E6AA1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x557_86mx~jnsy"><intent_id>1057841</intent_id><project_id>918897</project_id><text_data>Correction Note 1. A) The description of the project is copied directly from the advertisement to bid. Please let me know if i need to break it down further.B) We are the prime contractor on the project. We will be performing all of the roadway improvements including storm and water, install all storm and gravity piping systems, all excavation for tank, all piping and pump installation in the pump station, all concrete not associated with the tank, preparation of all site work prior to subcontractor installation of items such as fencing, landscaping and building.  C) Millwrights will be installing the Mixer, division 11220, mentioned in CSI master Format under 11220 Mixers and Flocculator�s. They will utilize a hoist to install through a hatch and then affix to the floor using hand and power tools aligning with square rules and plum bobs.</text_data><comment_date>2020-05-18T00:00:00</comment_date></row><row _id="row-6cqb-2hs3~xnas" _uuid="00000000-0000-0000-90EF-C42E2F41B705" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6cqb-2hs3~xnas"><intent_id>528181</intent_id><project_id>690784</project_id><text_data>1112091</text_data><comment_date>2012-08-13T00:00:00</comment_date></row><row _id="row-wtjk_jk7q.z8hw" _uuid="00000000-0000-0000-643C-963AC0F465AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wtjk_jk7q.z8hw"><intent_id>837707</intent_id><project_id>736747</project_id><text_data>Providing the beautification of the area adjacent to the waste water treatment plant using a blower/mulch truck.</text_data><comment_date>2017-06-02T00:00:00</comment_date></row><row _id="row-i6xd~gmta.t2pn" _uuid="00000000-0000-0000-2BCA-AEB789477C83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i6xd~gmta.t2pn"><intent_id>632983</intent_id><project_id>736235</project_id><text_data>The General Laborer will be performing earthwork and the Other Truck will the a Lowboy Tractor.</text_data><comment_date>2014-06-03T00:00:00</comment_date></row><row _id="row-2xmw-zxuj.5b7y" _uuid="00000000-0000-0000-6B4B-2ABE46A50136" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2xmw-zxuj.5b7y"><intent_id>684684</intent_id><project_id>741660</project_id><text_data>Filed by Kelly J. Sharick</text_data><comment_date>2015-03-19T00:00:00</comment_date></row><row _id="row-9cn6-g3tz-k8zr" _uuid="00000000-0000-0000-9F7A-8A9FA3A845C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9cn6-g3tz-k8zr"><intent_id>820144</intent_id><project_id>815358</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.</text_data><comment_date>2017-03-10T00:00:00</comment_date></row><row _id="row-fjvt_kvb5_fw3a" _uuid="00000000-0000-0000-C675-8F87ACD66909" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fjvt_kvb5_fw3a"><intent_id>1150751</intent_id><project_id>965688</project_id><text_data>General Laborer performing work separate from Electronic Technician, and Ironworkers</text_data><comment_date>2021-06-08T00:00:00</comment_date></row><row _id="row-6pkx_sxcx.pu37" _uuid="00000000-0000-0000-A2D9-62DC251B0C75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6pkx_sxcx.pu37"><intent_id>1131602</intent_id><project_id>955785</project_id><text_data>09-21-009R</text_data><comment_date>2021-03-25T00:00:00</comment_date></row><row _id="row-9pis_wfar_q4xa" _uuid="00000000-0000-0000-D290-8F086CD0D064" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9pis_wfar_q4xa"><intent_id>612107</intent_id><project_id>727387</project_id><text_data>1. painting, carpentry; 2. single family; 3. one story; 4. a)no; b) no; c) yes; d) no; e) no; f) no; g) no; h) no; i) no; j) no; k) none; 5. yes; 6. yes; 7. no; 8. no</text_data><comment_date>2014-01-14T00:00:00</comment_date></row><row _id="row-kgmp.zv46-ykw2" _uuid="00000000-0000-0000-119B-3608FC943211" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kgmp.zv46-ykw2"><intent_id>834632</intent_id><project_id>820093</project_id><text_data>100% Employee Healthcare s paid as a Fringe</text_data><comment_date>2017-05-17T00:00:00</comment_date></row><row _id="row-99jy_qnay.nk5e" _uuid="00000000-0000-0000-4D84-64404F383190" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-99jy_qnay.nk5e"><intent_id>791914</intent_id><project_id>760414</project_id><text_data>The truck is a 2004 Ford flatbed</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-i4m8-8krc~dyva" _uuid="00000000-0000-0000-A3FB-21D992BEE6D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i4m8-8krc~dyva"><intent_id>624349</intent_id><project_id>732091</project_id><text_data>We will be hydroseeding at this site.</text_data><comment_date>2014-04-10T00:00:00</comment_date></row><row _id="row-sqik.e9j8~k8zw" _uuid="00000000-0000-0000-AE62-5E3D4A0A2931" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqik.e9j8~k8zw"><intent_id>761662</intent_id><project_id>790091</project_id><text_data>Material deliver oly</text_data><comment_date>2016-05-11T00:00:00</comment_date></row><row _id="row-eu2i.znuh.t662" _uuid="00000000-0000-0000-8E4A-0597E5A4E92B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eu2i.znuh.t662"><intent_id>901364</intent_id><project_id>846818</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY</text_data><comment_date>2018-04-27T00:00:00</comment_date></row><row _id="row-g8fn~9jq3_r9rt" _uuid="00000000-0000-0000-207E-66BAF0B9C7D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8fn~9jq3_r9rt"><intent_id>755833</intent_id><project_id>789243</project_id><text_data>Install new quad, data jacks, conduit and data cabling. ( 1161521)</text_data><comment_date>2016-04-11T00:00:00</comment_date></row><row _id="row-6uv6-sjbc_tjq7" _uuid="00000000-0000-0000-32D8-EDCDC6C2308C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6uv6-sjbc_tjq7"><intent_id>1272408</intent_id><project_id>1034153</project_id><text_data>Invoice #557360          $1064.11</text_data><comment_date>2022-10-05T00:00:00</comment_date></row><row _id="row-3mpi~rqui~qbsp" _uuid="00000000-0000-0000-8E8F-0CB1BD5D22B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3mpi~rqui~qbsp"><intent_id>1152560</intent_id><project_id>966634</project_id><text_data>**General labor consists of site protection, cleanup and help move material**</text_data><comment_date>2021-06-15T00:00:00</comment_date></row><row _id="row-55t3.qpjf.4rp4" _uuid="00000000-0000-0000-27A3-6AEA5AFD6B97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-55t3.qpjf.4rp4"><intent_id>627475</intent_id><project_id>734063</project_id><text_data>Form filed by: Jeff Grubbs</text_data><comment_date>2014-05-01T00:00:00</comment_date></row><row _id="row-enbu_em8g.e5qc" _uuid="00000000-0000-0000-6640-B3FE1FE29EA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-enbu_em8g.e5qc"><intent_id>880953</intent_id><project_id>840280</project_id><text_data>37851</text_data><comment_date>2017-12-27T00:00:00</comment_date></row><row _id="row-sih2-u3fv~8fif" _uuid="00000000-0000-0000-732C-F38D01C45CAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sih2-u3fv~8fif"><intent_id>655800</intent_id><project_id>744855</project_id><text_data>1065C-38882</text_data><comment_date>2014-09-19T00:00:00</comment_date></row><row _id="row-qwsf~9trc-ge9a" _uuid="00000000-0000-0000-5E7C-A40C24263959" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qwsf~9trc-ge9a"><intent_id>1176352</intent_id><project_id>978666</project_id><text_data>Hm Job 4210</text_data><comment_date>2021-09-09T00:00:00</comment_date></row><row _id="row-n782-889f_xwma" _uuid="00000000-0000-0000-CC04-AE608DD90568" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n782-889f_xwma"><intent_id>1219581</intent_id><project_id>1004741</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION BUNDLE OF 20 JOBS. THEY ARE ALL SINGLE FAMILY, RESIDENTIAL DWELLINGS.  6113 NE 103RD CT, VANCOUVER   16314 NE 137TH AVE, BRUSH PRAIRIE   13607 NE 65TH ST, VANCOUVER   14904 SE 1ST ST, VANCOUVER   3841 ADDY ST, WASHOUGAL   565 9TH ST, WASHOUGAL   4501 ADDY ST #129, WASHOUGAL</text_data><comment_date>2022-03-21T00:00:00</comment_date></row><row _id="row-k3wr-nc5b.aup3" _uuid="00000000-0000-0000-5E57-FD342F39F8D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3wr-nc5b.aup3"><intent_id>908793</intent_id><project_id>843530</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2018-06-04T00:00:00</comment_date></row><row _id="row-a833~7t3t~bxva" _uuid="00000000-0000-0000-0323-B44AA1379640" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a833~7t3t~bxva"><intent_id>796306</intent_id><project_id>805065</project_id><text_data>PC6 - 615710/17/2016Contract #10934 John EdgarCE</text_data><comment_date>2016-10-17T00:00:00</comment_date></row><row _id="row-ei3e~cqzu~ryqc" _uuid="00000000-0000-0000-9D3E-CBA001EC7115" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ei3e~cqzu~ryqc"><intent_id>1092021</intent_id><project_id>932219</project_id><text_data>Cove base install</text_data><comment_date>2020-09-29T00:00:00</comment_date></row><row _id="row-r4sw_fk3w.wijv" _uuid="00000000-0000-0000-0A31-B0128514C650" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r4sw_fk3w.wijv"><intent_id>730662</intent_id><project_id>770862</project_id><text_data>wa</text_data><comment_date>2015-11-09T00:00:00</comment_date></row><row _id="row-zrje.e569.d3af" _uuid="00000000-0000-0000-5869-8618AFDD27C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zrje.e569.d3af"><intent_id>498424</intent_id><project_id>523718</project_id><text_data>Ebenal General Inc is filing on behalf of Creative Concrete Products because they have refused to file.</text_data><comment_date>2012-01-30T00:00:00</comment_date></row><row _id="row-rshw~y82p-7se9" _uuid="00000000-0000-0000-0A17-30DC04B6AE3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rshw~y82p-7se9"><intent_id>596552</intent_id><project_id>708809</project_id><text_data>Owner-Operator performed all work on project.</text_data><comment_date>2013-09-28T00:00:00</comment_date></row><row _id="row-syxr-hshj_akbg" _uuid="00000000-0000-0000-CC7C-970BB676F619" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-syxr-hshj_akbg"><intent_id>896119</intent_id><project_id>847265</project_id><text_data>Truck Other is for the single axle 2000 gallon water truck</text_data><comment_date>2018-04-02T00:00:00</comment_date></row><row _id="row-ebtj_rn8s-g5by" _uuid="00000000-0000-0000-8AFB-AAD211CB43D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebtj_rn8s-g5by"><intent_id>840486</intent_id><project_id>824346</project_id><text_data>DUCT WORK MOTIFICATIONS</text_data><comment_date>2017-06-14T00:00:00</comment_date></row><row _id="row-wkv7.6q78~q8bw" _uuid="00000000-0000-0000-3EE2-1ED4002A4F41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wkv7.6q78~q8bw"><intent_id>752680</intent_id><project_id>772354</project_id><text_data>Breakdown for $24.85 Fringe is as follows:$2.65 Medical$22.20 Davis Bacon Pension</text_data><comment_date>2016-03-24T00:00:00</comment_date></row><row _id="row-qapc~r43g-pztd" _uuid="00000000-0000-0000-DA4F-4F54D118F9C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qapc~r43g-pztd"><intent_id>1317129</intent_id><project_id>921087</project_id><text_data>#2206</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-idnj.9j2q_eeqn" _uuid="00000000-0000-0000-6281-3B97D91E3EEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-idnj.9j2q_eeqn"><intent_id>934683</intent_id><project_id>862128</project_id><text_data>Elect Tech(06)inside workinstall antenna dishes</text_data><comment_date>2018-09-21T00:00:00</comment_date></row><row _id="row-3spy-6evq.8c9g" _uuid="00000000-0000-0000-2BA8-FE07C1D3C4CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3spy-6evq.8c9g"><intent_id>680242</intent_id><project_id>756147</project_id><text_data>Fringe $12.90 breakdown : $.43 Life Ins., $1.55 Med/Dental Ins., $10.92 Pension Plan</text_data><comment_date>2015-02-20T00:00:00</comment_date></row><row _id="row-3agk_wk7h.yvhi" _uuid="00000000-0000-0000-204E-316BA26872CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3agk_wk7h.yvhi"><intent_id>862498</intent_id><project_id>816390</project_id><text_data>170239</text_data><comment_date>2017-09-13T00:00:00</comment_date></row><row _id="row-dyjw.nmec_mtv8" _uuid="00000000-0000-0000-618E-81A4E5F8FAB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dyjw.nmec_mtv8"><intent_id>957341</intent_id><project_id>871831</project_id><text_data>MMFS Job#73186654</text_data><comment_date>2019-01-28T00:00:00</comment_date></row><row _id="row-hv2w.fmhc~yh3z" _uuid="00000000-0000-0000-BAC6-0BF07372B9C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hv2w.fmhc~yh3z"><intent_id>510107</intent_id><project_id>386172</project_id><text_data>Silverstreak Inc is filing on behalf of Mark A Carter Inc because they have refused to file.</text_data><comment_date>2012-05-15T00:00:00</comment_date></row><row _id="row-mkwe~bah4_566x" _uuid="00000000-0000-0000-6B10-C26CB3CA5DBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mkwe~bah4_566x"><intent_id>1140269</intent_id><project_id>950611</project_id><text_data>921136  Fernanda Rivera, 2205 S 18th St, Union Gap</text_data><comment_date>2021-04-28T00:00:00</comment_date></row><row _id="row-crhj~zi9u.xpfr" _uuid="00000000-0000-0000-F579-489B89554AE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-crhj~zi9u.xpfr"><intent_id>605240</intent_id><project_id>709470</project_id><text_data>Project is exempt from the payment of state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2013-11-19T00:00:00</comment_date></row><row _id="row-8zsj-m8jz.saai" _uuid="00000000-0000-0000-B0AE-AEE46F505E0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zsj-m8jz.saai"><intent_id>592282</intent_id><project_id>716930</project_id><text_data>Filed by Heather Rader.</text_data><comment_date>2013-09-06T00:00:00</comment_date></row><row _id="row-6ti3.4cdf_wdvx" _uuid="00000000-0000-0000-486E-62E68DC21C00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ti3.4cdf_wdvx"><intent_id>485301</intent_id><project_id>659857</project_id><text_data>Other Truck is for the Self Propelled street sweeper that falls under group 3 truck drivers.</text_data><comment_date>2011-10-24T00:00:00</comment_date></row><row _id="row-akta.pncg~67s9" _uuid="00000000-0000-0000-D5D2-3302C902828E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-akta.pncg~67s9"><intent_id>732879</intent_id><project_id>767280</project_id><text_data>302010</text_data><comment_date>2015-11-24T00:00:00</comment_date></row><row _id="row-464m~smak.rfz2" _uuid="00000000-0000-0000-6EA1-C28C5C921A71" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-464m~smak.rfz2"><intent_id>497013</intent_id><project_id>681439</project_id><text_data>Craig Kalmey      OwnerLisa Kalmey       Owner</text_data><comment_date>2012-01-14T00:00:00</comment_date></row><row _id="row-z9iy-cdnt_hsv3" _uuid="00000000-0000-0000-DFF1-9FF09B0B68F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z9iy-cdnt_hsv3"><intent_id>752334</intent_id><project_id>787649</project_id><text_data>Filed by Steven A. Wold</text_data><comment_date>2016-03-21T00:00:00</comment_date></row><row _id="row-futx~br23_4ytj" _uuid="00000000-0000-0000-4130-0908042D026D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-futx~br23_4ytj"><intent_id>581748</intent_id><project_id>714852</project_id><text_data>Form Filed By: WIlliam Ingalls</text_data><comment_date>2013-07-17T00:00:00</comment_date></row><row _id="row-urpi_jcdh-q7a3" _uuid="00000000-0000-0000-EEBE-F800432C0E9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-urpi_jcdh-q7a3"><intent_id>671906</intent_id><project_id>751469</project_id><text_data>1. install bath fan 2. single family house 3. 1 level 4a. no b. no c. yes d. no e. no f. no g. no h. no I. no j. no k. no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2015-01-04T00:00:00</comment_date></row><row _id="row-a3hr-4hsm.eeqk" _uuid="00000000-0000-0000-BB5E-633F70327579" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a3hr-4hsm.eeqk"><intent_id>679177</intent_id><project_id>741211</project_id><text_data>Form filed by:  Dawn Skinner</text_data><comment_date>2015-02-13T00:00:00</comment_date></row><row _id="row-ceyv.x9km~5tyd" _uuid="00000000-0000-0000-2575-85A2BA9AC1D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ceyv.x9km~5tyd"><intent_id>1268842</intent_id><project_id>1032249</project_id><text_data>Millwrights will be installing chlorine scrubber equipment mentioned in CSI Master format under 460100. They will utilize a hoist to the scrubber into place and install the equipment using hand and power tools aligning with square rules and plumb bob</text_data><comment_date>2022-09-22T00:00:00</comment_date></row><row _id="row-tqz8_cm32-z3vp" _uuid="00000000-0000-0000-C453-4411924814D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tqz8_cm32-z3vp"><intent_id>1157852</intent_id><project_id>965405</project_id><text_data>1.Replace bath fan &amp; switch2.Single Family Dwelling3.14.a. No; b. No; c. Yes; d. No; e. No; f. No; g. No; h. No; i. No; j. No; k. No; l. No5.Yes6.Yes7.No8.No</text_data><comment_date>2021-07-06T00:00:00</comment_date></row><row _id="row-wrgj-tfh6-m6d2" _uuid="00000000-0000-0000-BA7B-F115AB2C6CFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wrgj-tfh6-m6d2"><intent_id>921451</intent_id><project_id>857155</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2018-07-27T00:00:00</comment_date></row><row _id="row-fv68-k42y-5hs3" _uuid="00000000-0000-0000-369C-E7098E3D5E48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fv68-k42y-5hs3"><intent_id>715893</intent_id><project_id>770476</project_id><text_data>Teresa Sanders - residential bath exhaust fan119 W. 2nd StAberdeen WA   98520P.O. #21334   Job #1575101</text_data><comment_date>2015-08-21T00:00:00</comment_date></row><row _id="row-6tzq-5hfs~efk7" _uuid="00000000-0000-0000-0066-FE6E39A2A166" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6tzq-5hfs~efk7"><intent_id>666997</intent_id><project_id>749380</project_id><text_data>Workers on the project will be constructing several temporary wooden enclosures using power tools and hand tools, including hammers, drills, and worm-drive saws.  These temporary structures will be constructed adjacent to and inside the critical MCC Building at the Spokane Waste to Energy Facility.Work will include:- building wooden structures - fitting and nailing sheathing on outer walls of the structures- preparing layout, using tape measures and framing square- Marking,  cutting and assembling lines on materials, using pencil, chalk, and marking gauge.- Shaping materials to prescribed measurements, using saws and chisels.- Assembling, cutting and shaping materials and then fastening them together with nails, and screws.- Verifying trueness of structure with plumb bob and carpenter&amp;#39;s level.</text_data><comment_date>2014-11-21T00:00:00</comment_date></row><row _id="row-3ipa_6v2j-ue97" _uuid="00000000-0000-0000-2C2E-75C46EE62927" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ipa_6v2j-ue97"><intent_id>1147818</intent_id><project_id>964021</project_id><text_data>Project# 03126, Harms, Jennifer, 3323 N Madelia St, Spokane, WA 99207</text_data><comment_date>2021-06-17T00:00:00</comment_date></row><row _id="row-x9w9-jkk6_eia3" _uuid="00000000-0000-0000-B59C-87DB1FA6A9FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x9w9-jkk6_eia3"><intent_id>1277836</intent_id><project_id>1037074</project_id><text_data>#1- heat pump repair; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2022-10-26T00:00:00</comment_date></row><row _id="row-nxxi.zwrp~mutv" _uuid="00000000-0000-0000-E75C-3697E6B85AC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nxxi.zwrp~mutv"><intent_id>1108674</intent_id><project_id>930023</project_id><text_data>Fringe Benefit Breakdown- Health $9.01, Pension $11.00, Apprenticeship $.74, Annuity $7.95, Impact $.28, PTO $2.30</text_data><comment_date>2020-12-09T00:00:00</comment_date></row><row _id="row-p6fh~apsx~a4g7" _uuid="00000000-0000-0000-04F1-6EBA81F1DB06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p6fh~apsx~a4g7"><intent_id>1126749</intent_id><project_id>921706</project_id><text_data>119814-001</text_data><comment_date>2021-03-05T00:00:00</comment_date></row><row _id="row-9b2y.t3mn_mb8d" _uuid="00000000-0000-0000-E71B-3629610D54EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9b2y.t3mn_mb8d"><intent_id>1064334</intent_id><project_id>921962</project_id><text_data>Equipment: Marathon MPT-4FL CompactorSerial Number: 901158Report: Hose that was installed last month is leaking.5/18/20: Technician arrived on site and evaluated unit. Found oil leaking from the pipe threads on the 3/8� quick disconnect (male end on hose). Was able to stop the leak by tightening the fitting. Tested under bypass pressure; no leaks detected. Tested for function; operating satisfactorily.</text_data><comment_date>2020-06-11T00:00:00</comment_date></row><row _id="row-k8tv~42qy_b58f" _uuid="00000000-0000-0000-71A7-EE1480F7F724" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k8tv~42qy_b58f"><intent_id>1331363</intent_id><project_id>1017431</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2023-05-26T00:00:00</comment_date></row><row _id="row-tiru_4pqq~yiuj" _uuid="00000000-0000-0000-A91D-5B52E6062BF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tiru_4pqq~yiuj"><intent_id>737767</intent_id><project_id>780818</project_id><text_data>Residential homes within Whitman County.</text_data><comment_date>2015-12-15T00:00:00</comment_date></row><row _id="row-2wj3_kscv_2ti7" _uuid="00000000-0000-0000-935F-AA8C2C1C4B96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2wj3_kscv_2ti7"><intent_id>1219372</intent_id><project_id>995092</project_id><text_data>We will be installing an irrigation system, not to exceed 36 inches in depth, topsoil and bark using a conveyor truck and plants using various hand tools such as shovels and rakes. We will not be installing any subsurface water collection systems.</text_data><comment_date>2022-03-21T00:00:00</comment_date></row><row _id="row-riss~9fgj~jptt" _uuid="00000000-0000-0000-02F7-ED0E5BA3BC0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-riss~9fgj~jptt"><intent_id>859649</intent_id><project_id>831419</project_id><text_data>Vendor Key AMERICAN 017</text_data><comment_date>2017-08-30T00:00:00</comment_date></row><row _id="row-xkcm-7cad~xf5n" _uuid="00000000-0000-0000-6CD5-FBAB0BA74BF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xkcm-7cad~xf5n"><intent_id>954652</intent_id><project_id>870532</project_id><text_data>Laborer assisted owner in repairing kitchen sink P trap and replacing kitchen faucet and basket strainers.</text_data><comment_date>2019-01-11T00:00:00</comment_date></row><row _id="row-i4xa~ftgu-zv94" _uuid="00000000-0000-0000-8230-B1978279D9F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i4xa~ftgu-zv94"><intent_id>775440</intent_id><project_id>769052</project_id><text_data>Filed by Anaria GreenSubject: Statement of Intent to Pay Prevailing WagesProject: Stanwood YMCAThis letter is intended to address our request for an exemption for prevailing wages for the subject project. The project name is as stated in the Subject line above. Out subcontract is with Valley Electric who has hired us to perform professional services, specifically the task of electrical testing for the subject project. The testing involves performing acceptance/quality tests of ground resistance testing, medium voltage switch testing, circuit breaker testing, and transformer testing. 1. Purpose of Project:a. The purpose of the work performed by Sigma Six Solutions is to provide professional electrical testing services to check the quality of specific electrical parameters associated with the electrical distribution system.2. Remodeling or New Construction:a. Sigma Six�s work does not entail remodeling or construction activities or tasks; the work to be performed is only electrical testing. However, the work of Valley Electric does involve new construction. 3. Specific Tasks Performed by Sigma Six Solutions:a. Valley Electric craftsmen (IBEW electricians) will perform all labor and tool work associated with any assembly and installation work. The electrical testing performed by Sigma Six Solutions� field engineers and technicians will not involve any disassembly or re-assembly activity. b. A sigma Six employee will operate portable test equipment to perform the tests on the subject components. The test equipment is owned by Sigma Six and is not part of the project or product involved. Not tool work, assembly, disassembly, or any other construction craft activity will be performed by any Sigma Six employee. All such labor will be performed by Valley Electric electricians. c. A Sigma Six employee will record data observed during testing and provide Valley Electric with a written report of test results. d. At the completion of the testing, Valley Electric electricians will proceed with their construction activities to energize the electrical equipment. 4. Tools Used by Sigma Six Solutions:a. No hand or construction tools will be used by Sigma Six employees. All tool work will be performed by Valley Electric electricians as described above.5. Sigma Six Employee Hands-On Effort:a. A Sigma Six employee will operate portable test instrument owned by Sigma Six Solutions and record data for the report. Please feel free to contact me (253-333-9730) if further information or clarification is desired.Sincerely,Philip SernaPacific NorthwestSigma Six SolutionsPlease feel free to contact me (253-333-9730) if further information or clarification is desired.Sincerely,Philip SernaPacific NorthwestSigma Six Solutions</text_data><comment_date>2016-07-18T00:00:00</comment_date></row><row _id="row-kmj9_sq5d.77e7" _uuid="00000000-0000-0000-E00C-5883DBB52BC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kmj9_sq5d.77e7"><intent_id>1086537</intent_id><project_id>930867</project_id><text_data>Other Truck - Water Truck Other Truck - Lowboy Heavy Duty Trailer</text_data><comment_date>2020-09-09T00:00:00</comment_date></row><row _id="row-4g35.g32u~7zdp" _uuid="00000000-0000-0000-BA01-5FE011988D0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4g35.g32u~7zdp"><intent_id>1008222</intent_id><project_id>845033</project_id><comment_date>2019-10-09T00:00:00</comment_date></row><row _id="row-9ctv.ynei~xmjh" _uuid="00000000-0000-0000-C785-CD8378CFB617" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ctv.ynei~xmjh"><intent_id>837872</intent_id><project_id>823317</project_id><text_data>Install new cables can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-06-02T00:00:00</comment_date></row><row _id="row-xe5q~23j2-3acr" _uuid="00000000-0000-0000-CA7C-C4E2AF3DB690" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xe5q~23j2-3acr"><intent_id>623228</intent_id><project_id>729632</project_id><text_data>Form filed by: Kelly Bales</text_data><comment_date>2014-04-03T00:00:00</comment_date></row><row _id="row-j38h.wwsu_a5kf" _uuid="00000000-0000-0000-7256-794BE0F42A44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j38h.wwsu_a5kf"><intent_id>787634</intent_id><project_id>798002</project_id><text_data>Subcontractor was hired to deliver surfacing material (wood chips) in their truck to the address provided by the prime contractor. Load was dumped on the area/site that was marked off and prepared by the prime contractor.</text_data><comment_date>2016-09-07T00:00:00</comment_date></row><row _id="row-749c~2qcu_5ek9" _uuid="00000000-0000-0000-178F-8A9A408DF94C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-749c~2qcu_5ek9"><intent_id>731950</intent_id><project_id>774569</project_id><text_data>Project 6N54-0012</text_data><comment_date>2015-11-17T00:00:00</comment_date></row><row _id="row-wtqq.xvfn~h663" _uuid="00000000-0000-0000-ECAC-D2BA9CD1B007" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wtqq.xvfn~h663"><intent_id>596519</intent_id><project_id>720966</project_id><text_data>other truck is 2k gallon water truck or off road truck</text_data><comment_date>2013-09-27T00:00:00</comment_date></row><row _id="row-7pe9~aiyx.yk9u" _uuid="00000000-0000-0000-CDBE-0F7CC8BCE9BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7pe9~aiyx.yk9u"><intent_id>504152</intent_id><project_id>680637</project_id><text_data>Form filed by: Melissa Keating - murq235Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades. -murq235</text_data><comment_date>2012-03-16T00:00:00</comment_date></row><row _id="row-nykn_nsmr-33ht" _uuid="00000000-0000-0000-BEC4-B9FD7229770B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nykn_nsmr-33ht"><intent_id>1141573</intent_id><project_id>960091</project_id><text_data>We are a subcontractor for FieldTurf. They have been hired to improve the athletic surfaces at Snohomish High School. We are supplying and installing two coats of a water-based polyurethane red pigmented structural spray.  We will then restripe the running track with all lane lines, numbers, and event markings.  We use a spray machine and scissors and tape for masking areas to keep the other surfaces clean.</text_data><comment_date>2021-05-03T00:00:00</comment_date></row><row _id="row-ykjf.tjjc_anyc" _uuid="00000000-0000-0000-DBA1-2EAB6DA037A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ykjf.tjjc_anyc"><intent_id>727956</intent_id><project_id>774679</project_id><text_data>Other truck is a 4000 gallon water truck.</text_data><comment_date>2015-10-23T00:00:00</comment_date></row><row _id="row-ebvg-22hr~kx9k" _uuid="00000000-0000-0000-E3AA-7785C6B4D3BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebvg-22hr~kx9k"><intent_id>967001</intent_id><project_id>872692</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2019-03-22T00:00:00</comment_date></row><row _id="row-iu2n_b2tj_bpta" _uuid="00000000-0000-0000-EAAD-A135F46F459B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iu2n_b2tj_bpta"><intent_id>878886</intent_id><project_id>839256</project_id><text_data>City of Port OrchardROW Tree RemovalsEstimate #17746</text_data><comment_date>2017-12-12T00:00:00</comment_date></row><row _id="row-nayu_yvxp_mjr6" _uuid="00000000-0000-0000-5DB8-500C4EB3DB5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nayu_yvxp_mjr6"><intent_id>542012</intent_id><project_id>698677</project_id><text_data>&amp;quot;Other Trucks&amp;quot; include escort truck and Lowboy for mobilization.</text_data><comment_date>2012-10-29T00:00:00</comment_date></row><row _id="row-zdfv-nyve-ygxw" _uuid="00000000-0000-0000-B457-086995E07616" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdfv-nyve-ygxw"><intent_id>704940</intent_id><project_id>761803</project_id><text_data>HIRED BY SUB ANDERLE CONSTRUCTION</text_data><comment_date>2015-07-02T00:00:00</comment_date></row><row _id="row-jpm4.5s7c~atg4" _uuid="00000000-0000-0000-CAF6-7A262C8673F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jpm4.5s7c~atg4"><intent_id>652374</intent_id><project_id>739129</project_id><text_data>The only function the Owner/Operator is performing is driving his truck/end dump trailer-hauling material</text_data><comment_date>2014-09-05T00:00:00</comment_date></row><row _id="row-phy6-pvag-4trn" _uuid="00000000-0000-0000-E8F5-B568567F37E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-phy6-pvag-4trn"><intent_id>1101870</intent_id><project_id>904764</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc.Remove old culverts and install larger box culverts.2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)]No3. Does this specific project entail the remodeling or new construction of a facility?No4. If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.No5. What specific tasks will your employees perform? Fish rescue/removal expertise using nets on an Unnamed Tributary to California Creek near Custer, Washington. 6. What, if any, tools will your employees use in the performance of those tasks?Nets7. If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? N/A8. Are you going to be hiring any subcontractors for this project?No9. When is your work to be completed? Planning or preconstruction phase or during the public works project?August 31, 2020</text_data><comment_date>2020-11-06T00:00:00</comment_date></row><row _id="row-esyg.79tn-sp54" _uuid="00000000-0000-0000-7122-3D8EB2F0C023" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-esyg.79tn-sp54"><intent_id>1336497</intent_id><project_id>1066742</project_id><text_data>Tacoma - Invoice 5002035504</text_data><comment_date>2023-06-14T00:00:00</comment_date></row><row _id="row-pbpx_ibus_v4zp" _uuid="00000000-0000-0000-5CA2-044685D1D52B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbpx_ibus_v4zp"><intent_id>937935</intent_id><project_id>848963</project_id><text_data>truck driver other drives a non cdl 26K GVW truck to haul hydroseeder onsite onlylandscape construction driver drives 3500 pickup truck onsite for supplieslandscape laborer moves hoses for seeding and hauling supplies to plant.</text_data><comment_date>2018-10-05T00:00:00</comment_date></row><row _id="row-s6k3.867f-3fqr" _uuid="00000000-0000-0000-0B56-8575B2A42BB0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s6k3.867f-3fqr"><intent_id>598402</intent_id><project_id>707964</project_id><text_data>Customer Kehoe:  Modular home install digital thermostat, perform annual maintenance, time to bid revamp of duct work</text_data><comment_date>2013-10-09T00:00:00</comment_date></row><row _id="row-4n5w_sf5n_cztb" _uuid="00000000-0000-0000-C11A-E8D895F12AFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4n5w_sf5n_cztb"><intent_id>1001800</intent_id><project_id>855465</project_id><comment_date>2019-08-22T00:00:00</comment_date></row><row _id="row-ta45_pgwc~j3e6" _uuid="00000000-0000-0000-488E-C92FB1083EA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ta45_pgwc~j3e6"><intent_id>477852</intent_id><project_id>667564</project_id><text_data>LNI - 509,727-03</text_data><comment_date>2011-10-06T00:00:00</comment_date></row><row _id="row-m54p.zeb7.kgyz" _uuid="00000000-0000-0000-F402-699D8FF86743" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m54p.zeb7.kgyz"><intent_id>826264</intent_id><project_id>817985</project_id><text_data>Industrial Insurance account number 98610900</text_data><comment_date>2017-04-14T00:00:00</comment_date></row><row _id="row-se5q-v7b7.7tvt" _uuid="00000000-0000-0000-4046-26E6E4BBBC2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-se5q-v7b7.7tvt"><intent_id>613815</intent_id><project_id>728102</project_id><text_data>Job # 204069</text_data><comment_date>2014-01-27T00:00:00</comment_date></row><row _id="row-7kgr~w9pp_5dqb" _uuid="00000000-0000-0000-F107-22441EFF64E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7kgr~w9pp_5dqb"><intent_id>724926</intent_id><project_id>774111</project_id><text_data>055087</text_data><comment_date>2015-10-07T00:00:00</comment_date></row><row _id="row-uefv-thvf.ez7f" _uuid="00000000-0000-0000-C0B3-017CDEF0E1C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uefv-thvf.ez7f"><intent_id>1497836</intent_id><project_id>1163156</project_id><text_data>INVOICE 24-401.F</text_data><comment_date>2024-12-31T00:00:00</comment_date></row><row _id="row-9yp7.zxb4_sb2g" _uuid="00000000-0000-0000-972B-7802D77917CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9yp7.zxb4_sb2g"><intent_id>1492784</intent_id><project_id>1159963</project_id><text_data>I updated the fringe amount, it was filled incorrectly</text_data><comment_date>2024-12-31T00:00:00</comment_date></row><row _id="row-3bcz-x83m_jwsp" _uuid="00000000-0000-0000-548E-88C2F2FD4CFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bcz-x83m_jwsp"><intent_id>514420</intent_id><project_id>688627</project_id><text_data>Mainline addition of existing irrigation system to include: hand digging using shovels, hand spades, rakes, buckets, and a wheelbarrow to expose sprinkler heads and supply lines to be repaired and pliers and pipe cutters to replace sprinkler heads and supply lines as needed.  Any soil compaction will be done by hand due to only exposing small areas of the system for repairs.</text_data><comment_date>2012-05-31T00:00:00</comment_date></row><row _id="row-8tmg-wrwy.fgp2" _uuid="00000000-0000-0000-CFDF-957C681AD292" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8tmg-wrwy.fgp2"><intent_id>1234525</intent_id><project_id>882988</project_id><text_data>24818</text_data><comment_date>2022-05-18T00:00:00</comment_date></row><row _id="row-zcgw.c74i_wcgi" _uuid="00000000-0000-0000-1A80-53A79BA09AB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zcgw.c74i_wcgi"><intent_id>1265763</intent_id><project_id>1030537</project_id><text_data>8/22/2022 Technician arrived on site and set up for service call. Inspected the unit. Removed and replaced pressure switch. Repaired fittings. Found power going in the panel. Tested components inside the panel. Was not able to force start the motor. The motor sounds like it is seized. SWS Equipment to send out an additional tech to investigate.08/26/2022 - Technician returned to site to complete quoted work and further diagnose/repair unit. Technician found the following:- Drain pipe leaking &amp; tightened connection.- Pressure gauge damaged and replaced it.- Interlock safety switch for the loading door missing and installed new interlock.- Removed and replaced broken emergency stop button.- Reverse push button stuck in the off position. It had rusted out all the wiring inside the remote control box. Technician replaced the reverse push button. - Technician adjusted the pressure switch for detecting the ram back position to 800psi and the pressure switch to detect the ram forward position was set to 1800psi.- Cylinder leaking hydraulic oil. Technician unable to repair.- Doghouse is rusting out and there are holes throughout it.- Container has significant rusting, there are holes throughout it and the structure is thin.- Motor and pump are making noises.- Technician supplied customer X6 keys. Unit tested. Based on the age (over 40 years +)and condition of the compactor, SWS Equipment recommends replacing unit. The cost to repair would exceed the value of the unit. Since the scope of work changed, customer to be billed time and materials..</text_data><comment_date>2022-09-12T00:00:00</comment_date></row><row _id="row-3qfq.68jc~e5j4" _uuid="00000000-0000-0000-706F-DE5AD197FD94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3qfq.68jc~e5j4"><intent_id>567817</intent_id><project_id>710243</project_id><text_data>Modify existing drainage system in park planting beds. Excavate approximately 24&amp;quot; depth to expose existing drain line. Tie new 4&amp;quot; drain line in to existing drain line. Bakfill. Trenching by hand tools and 45ph walk behind Dingo w/trenching attachment.</text_data><comment_date>2013-05-03T00:00:00</comment_date></row><row _id="row-bizj_h922-q8gz" _uuid="00000000-0000-0000-0A7A-6330BDC89DC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bizj_h922-q8gz"><intent_id>637937</intent_id><project_id>738185</project_id><text_data>Several manufactured homes within the Mountain Green MHP		#1 - Install Floor Insulation #2 - Single family manufactured home #3 - 1 level #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - Unknown #8 - No</text_data><comment_date>2014-06-27T00:00:00</comment_date></row><row _id="row-cbed.m7d2-q24i" _uuid="00000000-0000-0000-CB4E-BBBE4DBC914A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cbed.m7d2-q24i"><intent_id>778902</intent_id><project_id>798475</project_id><text_data>Whitewebs Lane, Greenbank1. Air seal, insulate crawl2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. No</text_data><comment_date>2016-08-01T00:00:00</comment_date></row><row _id="row-ij5h~9iw7~ta7h" _uuid="00000000-0000-0000-A5DA-B587BA9DFBFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ij5h~9iw7~ta7h"><intent_id>1278592</intent_id><project_id>1037487</project_id><text_data>Water mitigation and repairs to bedroom in house from leak in ceiling Single family dwelling1Residential Livinga)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no l)no5 yes6 yes7 no8 no</text_data><comment_date>2022-10-28T00:00:00</comment_date></row><row _id="row-rbai_nazt.4h95" _uuid="00000000-0000-0000-9A92-A63479D10259" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rbai_nazt.4h95"><intent_id>1199128</intent_id><project_id>991684</project_id><text_data>PaintingSingle Family HomeOne level homeNo commercial use Just permanent residential livingYesYesNoNo</text_data><comment_date>2021-12-14T00:00:00</comment_date></row><row _id="row-4kes_unuc-vzt4" _uuid="00000000-0000-0000-A782-A7A17FF7EA4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4kes_unuc-vzt4"><intent_id>874750</intent_id><project_id>830912</project_id><text_data>Filed by Misty Mare</text_data><comment_date>2017-11-14T00:00:00</comment_date></row><row _id="row-wrzb.smij_e2h4" _uuid="00000000-0000-0000-463B-B20BBE9850CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wrzb.smij_e2h4"><intent_id>1246892</intent_id><project_id>1020788</project_id><text_data>BELFOR will remove structures, debris, trash, human waste, medical waste, hazardous waste and other general items from city property related to the homelessness crisis.</text_data><comment_date>2022-07-06T00:00:00</comment_date></row><row _id="row-2ztw.hicj-2jd9" _uuid="00000000-0000-0000-9A19-2A1A9FF97998" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ztw.hicj-2jd9"><intent_id>1018817</intent_id><project_id>889882</project_id><comment_date>2019-10-30T00:00:00</comment_date></row><row _id="row-hd9m~u7ap~i8ev" _uuid="00000000-0000-0000-9503-498E755274C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hd9m~u7ap~i8ev"><intent_id>895834</intent_id><project_id>840009</project_id><text_data>This project is exempt from the payment of state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101</text_data><comment_date>2018-04-05T00:00:00</comment_date></row><row _id="row-w9an_tvzp~nngc" _uuid="00000000-0000-0000-8942-A4DCE1123504" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9an_tvzp~nngc"><intent_id>943123</intent_id><project_id>865412</project_id><text_data>Modification of Telecommunications equipment on Cell Tower</text_data><comment_date>2018-10-31T00:00:00</comment_date></row><row _id="row-fn36_x632-a8tr" _uuid="00000000-0000-0000-B5A4-3270137F3394" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fn36_x632-a8tr"><intent_id>499791</intent_id><project_id>679992</project_id><text_data>1. single family dwelling2.23.Permanent residence4.yes.5.yes6.no7.no</text_data><comment_date>2012-02-12T00:00:00</comment_date></row><row _id="row-yejy~f5z9-hskg" _uuid="00000000-0000-0000-5470-A1E47D34E306" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yejy~f5z9-hskg"><intent_id>1068378</intent_id><project_id>886086</project_id><text_data>Our workers compensation account is SAIF.</text_data><comment_date>2020-06-26T00:00:00</comment_date></row><row _id="row-6abc~uypz_bfrb" _uuid="00000000-0000-0000-FA22-98C93ADDC071" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6abc~uypz_bfrb"><intent_id>866200</intent_id><project_id>829353</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2017-09-29T00:00:00</comment_date></row><row _id="row-4ceq~ysjf-b2tm" _uuid="00000000-0000-0000-EC44-7FE0AC5A3735" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ceq~ysjf-b2tm"><intent_id>1234197</intent_id><project_id>1013550</project_id><text_data>Operators Fringe $20.20/hr = Health &amp; Welfare $8.40/hr,, Pension $11.05/hr, Training Fund $.70/hr and National Apprentice $.05/hrLaborers Fringe $14.60/hr = Health and Welfare $7.20/hr, Pension $6.35/hr, Training $.95/hr and Laborers Employer Cooperation and Education Trust $.10/hr</text_data><comment_date>2022-05-17T00:00:00</comment_date></row><row _id="row-u63u-7nap-swya" _uuid="00000000-0000-0000-5CB7-8B28525ABD25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u63u-7nap-swya"><intent_id>811552</intent_id><project_id>811415</project_id><text_data>Other Trucks (E.WA-690) Water Tank Truck (0 - 8000 Gallons) for dust control.</text_data><comment_date>2017-01-17T00:00:00</comment_date></row><row _id="row-cqu9.s356-vsfd" _uuid="00000000-0000-0000-6CC1-4D1BE23BC299" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqu9.s356-vsfd"><intent_id>680247</intent_id><project_id>756151</project_id><text_data>Job # 9024589</text_data><comment_date>2015-02-20T00:00:00</comment_date></row><row _id="row-2ccj-j4jj.3x86" _uuid="00000000-0000-0000-B108-14FD91217E42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ccj-j4jj.3x86"><intent_id>936539</intent_id><project_id>862811</project_id><text_data>Filed by Shelley Ankre</text_data><comment_date>2018-09-28T00:00:00</comment_date></row><row _id="row-mn4m_i829-dqhu" _uuid="00000000-0000-0000-CDF7-47A69F8371AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mn4m_i829-dqhu"><intent_id>808345</intent_id><project_id>809903</project_id><text_data>I will resubmit the report with 2 electrician and the other person did not do any prevailing wage work. I contacted the prevailing wage department for this information.</text_data><comment_date>2017-01-19T00:00:00</comment_date></row><row _id="row-4iet.b2fh-4ddp" _uuid="00000000-0000-0000-B47A-2D60A07EC0FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4iet.b2fh-4ddp"><intent_id>962594</intent_id><project_id>874329</project_id><text_data>Filed by Daniel N Nilsen</text_data><comment_date>2019-02-28T00:00:00</comment_date></row><row _id="row-6x7g_h4s9_ivvz" _uuid="00000000-0000-0000-F9DB-E9AB7F9420EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6x7g_h4s9_ivvz"><intent_id>610838</intent_id><project_id>726261</project_id><text_data>Filed by Cindy RimbeyProject is exempt from State Prevailing Wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2014-01-07T00:00:00</comment_date></row><row _id="row-v8gj~k6v4.d9uw" _uuid="00000000-0000-0000-D6BC-68F948A642D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8gj~k6v4.d9uw"><intent_id>930827</intent_id><project_id>860688</project_id><text_data>1. Gutter Cleaning and zinc treatment 2 apartment 3 2 story 4. a-no b-no c yes, d no e no f no g no h no i no j no k no  5- yes 7 yes 8 no</text_data><comment_date>2018-11-02T00:00:00</comment_date></row><row _id="row-3b92~4h7a-bkgd" _uuid="00000000-0000-0000-BF2B-D9D809A93336" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3b92~4h7a-bkgd"><intent_id>651129</intent_id><project_id>743053</project_id><text_data>1. weatherization 2.single family 3. 1 or 1.5 4.a.no b.no c. yes d.no f. no g.no h.no i.no j.no k.no 5.yes 6.yes 7.no 8.no</text_data><comment_date>2014-09-09T00:00:00</comment_date></row><row _id="row-4rqp.qejk.xd2g" _uuid="00000000-0000-0000-6767-6F1C27DF7FF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4rqp.qejk.xd2g"><intent_id>1043954</intent_id><project_id>911587</project_id><text_data>Tools, service van on site, basic hand tools, snap ring pliers, ratchet and sockets,</text_data><comment_date>2020-03-27T00:00:00</comment_date></row><row _id="row-2w6r-j2aa.thmm" _uuid="00000000-0000-0000-E6AB-F81824F99405" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2w6r-j2aa.thmm"><intent_id>479817</intent_id><project_id>675019</project_id><text_data>Approval of this form is based on information from Debra Bridgman that the work performed was for design and minimal labor in connection with installation of a radio communications system.</text_data><comment_date>2011-10-12T00:00:00</comment_date></row><row _id="row-j26j~bhhn~x8qa" _uuid="00000000-0000-0000-2CD1-FFE03BBB4EB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j26j~bhhn~x8qa"><intent_id>593709</intent_id><project_id>713763</project_id><text_data>General Laborer- Hand shovel rock and asphalt (Laborer Union)Other truck- Lowbed- Mobilization of quipment (Teamsters Union)</text_data><comment_date>2013-09-13T00:00:00</comment_date></row><row _id="row-nrjv_erhg_5ubk" _uuid="00000000-0000-0000-BDA5-B570781D652C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrjv_erhg_5ubk"><intent_id>466473</intent_id><project_id>663560</project_id><text_data>POWER EQUIP OPERATOR--VACUUM TRUCK LABORERS USING PRESSURE WASHER</text_data><comment_date>2011-07-18T00:00:00</comment_date></row><row _id="row-nvj2~edth-72zc" _uuid="00000000-0000-0000-20BD-A6AB24012F62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nvj2~edth-72zc"><intent_id>1126569</intent_id><project_id>953058</project_id><text_data>WAI job 21483-2</text_data><comment_date>2021-03-04T00:00:00</comment_date></row><row _id="row-s5fi-beg3~nf9d" _uuid="00000000-0000-0000-0EF1-21D4FA99E411" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s5fi-beg3~nf9d"><intent_id>1062710</intent_id><project_id>919000</project_id><text_data>Other Truck - Water Truck Other Truck - Lowboy Heavy Duty Trailer</text_data><comment_date>2020-06-04T00:00:00</comment_date></row><row _id="row-a3nt-iwgm_debs" _uuid="00000000-0000-0000-7AD2-ED125EC12224" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a3nt-iwgm_debs"><intent_id>1156006</intent_id><project_id>968455</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT. IT IS A SINGLE FAMILY RESIDENTIAL DWELLING.</text_data><comment_date>2021-06-28T00:00:00</comment_date></row><row _id="row-p26e_5k2q_yedf" _uuid="00000000-0000-0000-473E-EC7ABB12D4C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p26e_5k2q_yedf"><intent_id>1114165</intent_id><project_id>909910</project_id><text_data>Job 202305</text_data><comment_date>2021-01-09T00:00:00</comment_date></row><row _id="row-qw3a~ivqw_gshj" _uuid="00000000-0000-0000-938F-CD19A445EACB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qw3a~ivqw_gshj"><intent_id>694352</intent_id><project_id>756632</project_id><text_data>RooferFringes: Health &amp; Dental $2.53 - Davis Bacon Pension Fund $4.65</text_data><comment_date>2015-05-13T00:00:00</comment_date></row><row _id="row-9hki_gcz5_deq2" _uuid="00000000-0000-0000-A0BD-CC951F5AD6E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9hki_gcz5_deq2"><intent_id>824113</intent_id><project_id>817095</project_id><text_data>Job #110936-001</text_data><comment_date>2017-04-03T00:00:00</comment_date></row><row _id="row-22q4.vy4u_htrp" _uuid="00000000-0000-0000-3D6F-13442C10B21C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22q4.vy4u_htrp"><intent_id>1051552</intent_id><project_id>915784</project_id><text_data>Install telephone wireless access outlets and telephone cabling within the existing buildings</text_data><comment_date>2020-04-14T00:00:00</comment_date></row><row _id="row-ar3h~efi4_tenk" _uuid="00000000-0000-0000-BAB2-12A0599E15B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ar3h~efi4_tenk"><intent_id>1058085</intent_id><project_id>919016</project_id><text_data>Workers Compensation is provided by a reciprocating state policy, Utah WCF 2033000.</text_data><comment_date>2020-05-14T00:00:00</comment_date></row><row _id="row-8yk6_mv7n-ib87" _uuid="00000000-0000-0000-AF0D-67470DB093C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yk6_mv7n-ib87"><intent_id>628260</intent_id><project_id>734387</project_id><text_data>1- Weatherization/Construction2-single family dwelling3-single4-a)no  b)no  c)yes  d)no  e)no  f)no  g)no  h)no  I)no  j)no5-no6-no7-no8-no</text_data><comment_date>2014-05-06T00:00:00</comment_date></row><row _id="row-fvju_v7wb-dr4j" _uuid="00000000-0000-0000-422B-25939C292157" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fvju_v7wb-dr4j"><intent_id>1419889</intent_id><project_id>1120566</project_id><text_data>YX7212-02</text_data><comment_date>2024-04-16T00:00:00</comment_date></row><row _id="row-akyv~bad7.m5aw" _uuid="00000000-0000-0000-0BAF-7DBE7ABBB8EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-akyv~bad7.m5aw"><intent_id>1271568</intent_id><project_id>1016284</project_id><text_data>Dump truck driver/ owner operator</text_data><comment_date>2022-10-03T00:00:00</comment_date></row><row _id="row-rnsx-bc2s.2iee" _uuid="00000000-0000-0000-E9C0-CA36AEB335CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rnsx-bc2s.2iee"><intent_id>861127</intent_id><project_id>831971</project_id><text_data>WO #8026010</text_data><comment_date>2017-09-07T00:00:00</comment_date></row><row _id="row-x6s8_b7rx.7v7k" _uuid="00000000-0000-0000-86F3-9E9EF064AB27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x6s8_b7rx.7v7k"><intent_id>556311</intent_id><project_id>675364</project_id><text_data>Aggregate hauling</text_data><comment_date>2013-02-14T00:00:00</comment_date></row><row _id="row-ca4d-y47f.ukzf" _uuid="00000000-0000-0000-0F14-407E81EBBB87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ca4d-y47f.ukzf"><intent_id>790374</intent_id><project_id>788613</project_id><text_data>Scope of Work:Pulling telecomm and data cables indoor and outdoor of portable classrooms to inside rack.</text_data><comment_date>2016-09-20T00:00:00</comment_date></row><row _id="row-and4_m9gd_vzkb" _uuid="00000000-0000-0000-C785-A6AC0EEDEB26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-and4_m9gd_vzkb"><intent_id>1004659</intent_id><project_id>892231</project_id><text_data>Landscaping scope of work consists of modifying an existing irrigation system (pipe depth is 2'), importing and placing 4' depth of topsoil, installation of hydroseed,  amending soil for planting to a depth of 6', installation of new plants and shrubs and adding 3' of arbor mulch in new planting areas</text_data><comment_date>2019-09-04T00:00:00</comment_date></row><row _id="row-zhz5.wj33~mwa5" _uuid="00000000-0000-0000-FF69-DF50C9746679" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhz5.wj33~mwa5"><intent_id>1142113</intent_id><project_id>955732</project_id><text_data>Residential houses - redoing water linesSingle Dwelling1Residential housea. nob. noc. yesd. noe. nof. nog. noh. noi. noj. nok. nol.  no#5. yes#6. yes#7. no#8. no</text_data><comment_date>2021-05-05T00:00:00</comment_date></row><row _id="row-9mpp.m6nd-rgd8" _uuid="00000000-0000-0000-7E69-5511DAF2D50B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9mpp.m6nd-rgd8"><intent_id>783146</intent_id><project_id>793939</project_id><text_data>Granite hired us</text_data><comment_date>2016-08-17T00:00:00</comment_date></row><row _id="row-tjnn-7muw~7g4d" _uuid="00000000-0000-0000-983B-B010F532CFF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tjnn-7muw~7g4d"><intent_id>913650</intent_id><project_id>816844</project_id><text_data>Remove and replace track panel</text_data><comment_date>2018-06-25T00:00:00</comment_date></row><row _id="row-f6tq.9jd2-fd2c" _uuid="00000000-0000-0000-0789-2D09B305AD28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f6tq.9jd2-fd2c"><intent_id>1231119</intent_id><project_id>991688</project_id><text_data>Install irrigation system to a maximum depth of 3� below finished grade. Trench for irrigation system to a maximum depth of 3� below finished grade. Install plants, trees, shrubs. Spread topsoil, mulch or bark to plant beds. Equipment to be used, bobcat under 75hp and misc. small hand tools.</text_data><comment_date>2022-05-05T00:00:00</comment_date></row><row _id="row-n67b.gzcp-tygd" _uuid="00000000-0000-0000-DF33-C72771576E62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n67b.gzcp-tygd"><intent_id>534446</intent_id><project_id>669073</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-09-19T00:00:00</comment_date></row><row _id="row-qpfz_pnj5-txuz" _uuid="00000000-0000-0000-4242-D29331C6DCC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qpfz_pnj5-txuz"><intent_id>605230</intent_id><project_id>704051</project_id><text_data>Filed by Charles Hendeson</text_data><comment_date>2013-11-19T00:00:00</comment_date></row><row _id="row-zbg5.8ams-7xrs" _uuid="00000000-0000-0000-BE96-8DF6B68F37FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zbg5.8ams-7xrs"><intent_id>891112</intent_id><project_id>845044</project_id><text_data>Owner, Dan Stewart</text_data><comment_date>2018-03-05T00:00:00</comment_date></row><row _id="row-czdz_mnst~nbnq" _uuid="00000000-0000-0000-25FC-50B640FB60A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-czdz_mnst~nbnq"><intent_id>616537</intent_id><project_id>729243</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO(h) Dormitories? NO (i) Counseling? NO(j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public? NOO'DONNEL14116 11TH AVE CT STACOMA</text_data><comment_date>2014-02-17T00:00:00</comment_date></row><row _id="row-x46b~mypf.bcuy" _uuid="00000000-0000-0000-F4FE-8527D9C6BD7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x46b~mypf.bcuy"><intent_id>596924</intent_id><project_id>714487</project_id><text_data>401 moxee rd #13 naches,wa 98937</text_data><comment_date>2013-10-01T00:00:00</comment_date></row><row _id="row-7u47_auv2_pa9s" _uuid="00000000-0000-0000-2868-B755FCDB4F97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7u47_auv2_pa9s"><intent_id>709402</intent_id><project_id>764902</project_id><text_data>&amp;quot;TRUCK DRIVER OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK; &amp;quot;POWER EQUIPMENT OPERATOR MOTOR PATROL GRADER FINISHER&amp;quot; - NOT MOTOR PATROL, VACTOR GUZZLER/VACCON SUPER SUCKER</text_data><comment_date>2015-07-23T00:00:00</comment_date></row><row _id="row-ajb6.7yzn~4xxj" _uuid="00000000-0000-0000-7E77-0E8C24E1131F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ajb6.7yzn~4xxj"><intent_id>1185097</intent_id><project_id>976829</project_id><text_data>1Kathy BuchansFrom: Jameson, Jesse (LNI) &amp;lt;JAJC235@LNI.WA.GOV&amp;gt;Sent: Thursday, September 26, 2019 10:14 AMTo: Kathy BuchansSubject: RE: A-Gas US Inc. dba Rapid Recovery (UBI : 604 390 835)Hi KathyThe recovery or withdrawal only, of refrigerant from cooling equipment where the recovery process is performed byconnecting to an existing valve in the cooling system designed for that purpose, is exempt from contractor registration.Feel free to forward this email to Prevailing WageJesse L JamesonTechnical SpecialistConstruction Contractor Compliance12806 Gateway Dr S, Tukwila WA. 98168206-835-1107From: Kathy Buchans &amp;lt;Kathy.Buchans@raprec.com&amp;gt;Sent: Thursday, September 26, 2019 10:02 AMTo: Jameson, Jesse (LNI) &amp;lt;JAJC235@LNI.WA.GOV&amp;gt;Subject: A-Gas US Inc. dba Rapid Recovery (UBI : 604 390 835)Hello JessieThank you for talking my call. As you have requested, below is a synopsis of our scope of workas it relates to work being performed within the State of Washington. We were operatingunder UBI 603 125 737 as RapRec, Inc (Rapid Recovery). However, we were bought by A-GasUS Inc. several years ago and the correct UBI we should be utilizing is 604 390 855. Althoughwe are in a good position with the Dept of Revenue and Dept of Licensing, apparently we arenot correctly registered as a Contractor under this UBI. Hence, the reason we need identifywhat is further required of us, or not required of us, in order to appropriately use UBI 604 390855 for prevailing wage jobs.2A-Gas US Inc. (dba Rapid Recovery) is a subcontractor to a general, prime, or main contractor,and performing refrigerant abatement services under provisions set forth by the EnvironmentalProtection Agency under Section 608 of the Clean Air Act. Per the Clean Air Act all refrigerantmust be safely abated during the maintenance, service, repair, or disposal of air-conditioningand refrigeration equipment. Rapid Recovery does not perform any additional services otherthan recovering gas from units; we are not in the business of maintenance, service, repair, ordisposal.Again, thank you for your time, and I look forward to your response.KathyKathy BuchansContracts AdministratorT: 623-383-29648932 West Cactus Road, Peoria, Arizona 85381, View MapA-Gas in the Americas is a subsidiary of A-Gas US Holdings Inc.A full copy of our email privacy policy can be viewed on the A-Gas website</text_data><comment_date>2021-10-13T00:00:00</comment_date></row><row _id="row-fe5b_wjip_ft6m" _uuid="00000000-0000-0000-04B9-A6F342BA5AD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fe5b_wjip_ft6m"><intent_id>808821</intent_id><project_id>810134</project_id><text_data>Wage 40.30Pension 8.00H&amp;W 9.08App training  .60Admin Fund  .30LMCC   .10NLMCC .01NEBF  1.21</text_data><comment_date>2016-12-28T00:00:00</comment_date></row><row _id="row-2ipa.4dpv~afix" _uuid="00000000-0000-0000-E32D-29B7155EC8A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ipa.4dpv~afix"><intent_id>912641</intent_id><project_id>853919</project_id><text_data>other trucks include 4000 gal water truck for dust control</text_data><comment_date>2018-06-20T00:00:00</comment_date></row><row _id="row-m7yp~czhk~zdrf" _uuid="00000000-0000-0000-56E5-71E8F700506D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7yp~czhk~zdrf"><intent_id>615242</intent_id><project_id>728709</project_id><text_data>Install new Electric 15kw Furnace</text_data><comment_date>2014-02-06T00:00:00</comment_date></row><row _id="row-6jv4-bfuj.u26h" _uuid="00000000-0000-0000-EB8B-559F89A8189A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6jv4-bfuj.u26h"><intent_id>794486</intent_id><project_id>793840</project_id><text_data>disregard prior notes!</text_data><comment_date>2016-10-21T00:00:00</comment_date></row><row _id="row-s4y8~5k9e~s3jr" _uuid="00000000-0000-0000-23A6-3126F6F7DFDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4y8~5k9e~s3jr"><intent_id>965334</intent_id><project_id>875626</project_id><text_data>The truck used on this service is a 2007 Mitsubishi FUSO with a scale weight of 8,640 pounds The truck has no attachments and is used for transporting men and equipment to the job site.</text_data><comment_date>2019-03-19T00:00:00</comment_date></row><row _id="row-ddkg_93nq.m4ep" _uuid="00000000-0000-0000-2BD0-EB8EBF831A1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ddkg_93nq.m4ep"><intent_id>1145041</intent_id><project_id>962575</project_id><text_data>painting apartment buildings, main residential structures will be residential rates. The commercial rate will be used for office, gym, fence and carport painting.</text_data><comment_date>2021-05-17T00:00:00</comment_date></row><row _id="row-49b5.muda~r478" _uuid="00000000-0000-0000-309D-F3C13AB4DB0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49b5.muda~r478"><intent_id>1188434</intent_id><project_id>985306</project_id><text_data>Job #34252-1</text_data><comment_date>2021-10-26T00:00:00</comment_date></row><row _id="row-2qnp.kuf7.ipjb" _uuid="00000000-0000-0000-C464-9ED061980465" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2qnp.kuf7.ipjb"><intent_id>820821</intent_id><project_id>813675</project_id><text_data>We are a staffing firm with a worker on this project working with Pioneer Human Services.Our worker is a General Laborer doing clean up of grounds, trash removal, final cleaning of project.</text_data><comment_date>2017-03-22T00:00:00</comment_date></row><row _id="row-zima~v7ct_xb27" _uuid="00000000-0000-0000-2E79-91CB3A90B83E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zima~v7ct_xb27"><intent_id>797436</intent_id><project_id>799438</project_id><text_data>Tiger Mountain owns the trucks, Lakeridge pavs the drivers.</text_data><comment_date>2016-10-23T00:00:00</comment_date></row><row _id="row-b2mh-kyjq-w9us" _uuid="00000000-0000-0000-3117-5AB1BB12A7DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b2mh-kyjq-w9us"><intent_id>612066</intent_id><project_id>724146</project_id><text_data>PPC 13694THIS INTENT IS FOR BP#310.</text_data><comment_date>2014-01-14T00:00:00</comment_date></row><row _id="row-evdx~baev_2af2" _uuid="00000000-0000-0000-14C9-5489996541E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-evdx~baev_2af2"><intent_id>1114163</intent_id><project_id>935987</project_id><text_data>We are scanner/locators utilizing surveyor for prevailing wage rates.</text_data><comment_date>2021-01-09T00:00:00</comment_date></row><row _id="row-gfqb-xwa2~mjmg" _uuid="00000000-0000-0000-3E36-58EA5EF0EEFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfqb-xwa2~mjmg"><intent_id>594766</intent_id><project_id>709448</project_id><text_data>Hired by SAK &amp; Associates Inc</text_data><comment_date>2013-09-19T00:00:00</comment_date></row><row _id="row-yyq3_yrny~6z64" _uuid="00000000-0000-0000-95B6-95056032E2EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yyq3_yrny~6z64"><intent_id>1042135</intent_id><project_id>881980</project_id><text_data>We have supplied the answers to questions we were given regarding obtaining an exemption our answers are in dark blue below. Prevailing wage issues are very fact specific. In order for us to evaluate if the work to be performed by worker classification listed is not covered for the project name project, we need to know more about the project and the tasks your employees perform in conjunction with this project. Please provide us with the following information: 1.     What is the specific purpose of this awarding agency�s public works project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc. Owner (through General Contractor) is replacing old jail locks with new locks (this work is not by Status)Status is providing wiring diagrams, software programming, and verification witness testing 2.     Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)]No 3.     Does this specific project entail the remodeling or new construction of a facility? Yes 1.     If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc. Jail door control system 4.     What specific tasks will your employees perform?  Wiring design for the new lock  and software programming of the PLC and touchscreens 5.     What, if any, tools will your employees use in the performance of those tasks?None 6.     If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? No 7.     Are you going to be hiring any subcontractors for this project?.no8.     When is your work to be completed? Planning or preconstruction phase or during the public works project? During the project</text_data><comment_date>2020-03-02T00:00:00</comment_date></row><row _id="row-djh6_s8hi_9j6h" _uuid="00000000-0000-0000-06D8-C48310CE25C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-djh6_s8hi_9j6h"><intent_id>943276</intent_id><project_id>865477</project_id><text_data>WE WILL BE TOP DRESSING (SPREADING A LAYER OF SAND). THESE PROCESSES HAVE BEEN APPROVED AS FALLING UNDER THE WA LANDSCAPING CODE. WE ARE IN OREGON, AND WE HAVE THE RECIPRICAL AGREEMENT WITH WASHINGTON FOR WORKERS COMP</text_data><comment_date>2018-11-01T00:00:00</comment_date></row><row _id="row-v6qj-38ne_sbnn" _uuid="00000000-0000-0000-1F92-60339A096AF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v6qj-38ne_sbnn"><intent_id>1185863</intent_id><project_id>983902</project_id><text_data>2 tree removals, drop and leave.</text_data><comment_date>2021-10-15T00:00:00</comment_date></row><row _id="row-crz4-mjw9-bdiy" _uuid="00000000-0000-0000-548A-F63161246B73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-crz4-mjw9-bdiy"><intent_id>483464</intent_id><project_id>674662</project_id><text_data>Equipment &amp; tools:1.	Truck Driver-Driving Truck Mounted Hydro seeder and Skidster2.	Nozzle man-Spraying hydro mulch &amp; Operating Skidster3.	Landscape Laborer: Loading Seed, Fertilizer, Mulch into hand and cleaning.</text_data><comment_date>2011-10-13T00:00:00</comment_date></row><row _id="row-4net_uquz.4nf6" _uuid="00000000-0000-0000-41F5-375C4935109A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4net_uquz.4nf6"><intent_id>944118</intent_id><project_id>848858</project_id><text_data>imported material delivered to one single stockpile location on the project site</text_data><comment_date>2018-11-06T00:00:00</comment_date></row><row _id="row-wxsw-8smk.4qqq" _uuid="00000000-0000-0000-4047-2640423CB337" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wxsw-8smk.4qqq"><intent_id>1052805</intent_id><project_id>916400</project_id><text_data>9846541</text_data><comment_date>2020-04-21T00:00:00</comment_date></row><row _id="row-trx7~tmqr.v7fm" _uuid="00000000-0000-0000-D9CE-F765E881B2B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-trx7~tmqr.v7fm"><intent_id>714539</intent_id><project_id>766966</project_id><text_data>We have workers comp insurance in Oregon with liberty mutual</text_data><comment_date>2015-08-14T00:00:00</comment_date></row><row _id="row-xbfb~u3gs.yzba" _uuid="00000000-0000-0000-B9FD-46958D7268C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xbfb~u3gs.yzba"><intent_id>590279</intent_id><project_id>718684</project_id><text_data>LEAVENWORTH IS THE NEAREST CITY TO WHERE THE WORK IS BEING PERFORMED, THOUGH THE LOCATION OF THE WORK IS ACTUALLY UP ON STEVENS PASS IN KING COUNTY.  THE WORK IS NOT IN CHELAN COUNTY.</text_data><comment_date>2013-09-03T00:00:00</comment_date></row><row _id="row-6p4h~rgce~fn7p" _uuid="00000000-0000-0000-555A-0531F0602393" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6p4h~rgce~fn7p"><intent_id>970884</intent_id><project_id>878111</project_id><text_data>Truck Drivers to haul equipment &amp; materials to and from sitesInland Boatmen Operator to maneuver boats in and around sitesInland Deckhand to assist Boat Operator with varying duties laying boom, line, etc.Excavators to be used to remove materials and contaminated soilsMotor Patrol Grader to vacuum areas of all contaminated materialsNozzleman to pressure wash area clean of all contaminated materialsHaz Waste worker &amp; General Laborers to clear area of all debris using shovel/rakes/brooms, small hand held tools.</text_data><comment_date>2019-04-11T00:00:00</comment_date></row><row _id="row-59fw_au6q-mmax" _uuid="00000000-0000-0000-877B-7A9CF9BC9F7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-59fw_au6q-mmax"><intent_id>701607</intent_id><project_id>765221</project_id><text_data>Install 4&amp;quot; topsoil and hydroseed area</text_data><comment_date>2015-06-18T00:00:00</comment_date></row><row _id="row-nxyp.k5w9-9wnj" _uuid="00000000-0000-0000-CC6E-68E21691D4ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nxyp.k5w9-9wnj"><intent_id>469388</intent_id><project_id>671292</project_id><text_data>18916 60th Ave W Lynnwood WA 98036 - multiple addresses in the Edmonds Lynnwood neighborhoods</text_data><comment_date>2011-08-10T00:00:00</comment_date></row><row _id="row-przm-m2e4~95rg" _uuid="00000000-0000-0000-F390-E0614EEA47CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-przm-m2e4~95rg"><intent_id>1317277</intent_id><project_id>1061939</project_id><text_data>1 - Provide &amp; install flooring in housing unit2 - Yes - Apt3 - 1 story4 - HousingA) NoB) NoC) YesD) NoE) NoF) NoG) NoH) NoI) NoJ) NoK) No5 - Yes6 - Yes7 - No8 - No</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-6bbz_hehz-yi2k" _uuid="00000000-0000-0000-8F16-23AB04E18C44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6bbz_hehz-yi2k"><intent_id>723450</intent_id><project_id>773529</project_id><text_data>**9/29/15**Grover1)Install Electronic Air Cleaner2)YES3)1 STORY4)a-no b-no c-yes d-no e-no f-no g-no h-no I-no j-no k-none5)YES6)YES7)NO8)NO</text_data><comment_date>2015-09-29T00:00:00</comment_date></row><row _id="row-tueh~ckhg_28hi" _uuid="00000000-0000-0000-AAEC-C69A9A42924E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tueh~ckhg_28hi"><intent_id>1223890</intent_id><project_id>1007456</project_id><text_data>Job#21291</text_data><comment_date>2022-04-07T00:00:00</comment_date></row><row _id="row-r68b.zcvq.mekt" _uuid="00000000-0000-0000-0CEC-D84B4BBF142B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r68b.zcvq.mekt"><intent_id>923178</intent_id><project_id>857791</project_id><text_data>Truck Driver Ford 1-Ton used to transport material and equipment to and from jobsite</text_data><comment_date>2018-08-03T00:00:00</comment_date></row><row _id="row-h69d~y6pa-cnhd" _uuid="00000000-0000-0000-49FC-D715AB96E892" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h69d~y6pa-cnhd"><intent_id>574535</intent_id><project_id>712999</project_id><text_data>Filed by Katherine Batchelor.</text_data><comment_date>2013-06-11T00:00:00</comment_date></row><row _id="row-59ru.47mg.m4my" _uuid="00000000-0000-0000-10C2-381A8960F362" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-59ru.47mg.m4my"><intent_id>710753</intent_id><project_id>759695</project_id><text_data>Filed by Robert Donovan</text_data><comment_date>2015-07-29T00:00:00</comment_date></row><row _id="row-4f23_w8c3.8yzk" _uuid="00000000-0000-0000-46DB-98F84E19BF4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4f23_w8c3.8yzk"><intent_id>1142818</intent_id><project_id>935987</project_id><comment_date>2021-05-07T00:00:00</comment_date></row><row _id="row-aiah_cgn9.ybat" _uuid="00000000-0000-0000-9D4F-9EF3325D15F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aiah_cgn9.ybat"><intent_id>837013</intent_id><project_id>817729</project_id><text_data>Tymco 600 sweeper unit on Freightliner chassis</text_data><comment_date>2017-05-30T00:00:00</comment_date></row><row _id="row-b779-8rqz_fiin" _uuid="00000000-0000-0000-5ABA-D81560B9BD38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b779-8rqz_fiin"><intent_id>979505</intent_id><project_id>881837</project_id><text_data>Filed by Michelle Lyons</text_data><comment_date>2019-05-22T00:00:00</comment_date></row><row _id="row-mi65~bqxc_3ze8" _uuid="00000000-0000-0000-061A-946C1EF65FE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mi65~bqxc_3ze8"><intent_id>791848</intent_id><project_id>803426</project_id><text_data>Provide and install new cabling per drawings which can be used for telephone (voice over distance) and data (bits &amp; bytes)connections with the telecommunications system. This work will be performed indoors.</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-fs4p.hkvy-drs2" _uuid="00000000-0000-0000-2DBD-BFB36EDA353B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fs4p.hkvy-drs2"><intent_id>972254</intent_id><project_id>878102</project_id><text_data>Job 202290</text_data><comment_date>2019-04-17T00:00:00</comment_date></row><row _id="row-pgzr_8jkk_c4r3" _uuid="00000000-0000-0000-9681-E7B60C73DBCF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pgzr_8jkk_c4r3"><intent_id>1235471</intent_id><project_id>1014360</project_id><text_data>PO# 829473</text_data><comment_date>2022-05-22T00:00:00</comment_date></row><row _id="row-x66b~twqd~jsd3" _uuid="00000000-0000-0000-CB35-BA29F734E091" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x66b~twqd~jsd3"><intent_id>1343965</intent_id><project_id>1077010</project_id><text_data>Service truck used to get to work site and carry any possible needed hand tools or parts.</text_data><comment_date>2023-07-12T00:00:00</comment_date></row><row _id="row-w23c-tswc_hfsf" _uuid="00000000-0000-0000-0A1D-9E5DC1C29D83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w23c-tswc_hfsf"><intent_id>494230</intent_id><project_id>680243</project_id><text_data>171460</text_data><comment_date>2011-12-21T00:00:00</comment_date></row><row _id="row-34js-xzqs.8b2b" _uuid="00000000-0000-0000-B4B5-ACF03A1301B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-34js-xzqs.8b2b"><intent_id>1282402</intent_id><project_id>1040193</project_id><text_data>Addition of 3 telephone data cables in Primary Care exam room 7</text_data><comment_date>2022-11-09T00:00:00</comment_date></row><row _id="row-fgau.yd73-stan" _uuid="00000000-0000-0000-1063-4C56ECF4F9B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fgau.yd73-stan"><intent_id>1011763</intent_id><project_id>891472</project_id><text_data>Titan Job #1944PacWest Job #19-179</text_data><comment_date>2019-10-02T00:00:00</comment_date></row><row _id="row-4nag-t2kj-gdgb" _uuid="00000000-0000-0000-ECC3-E257776144F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4nag-t2kj-gdgb"><intent_id>870127</intent_id><project_id>831712</project_id><text_data>Elizabeth Sanchez510 West Oak St.Union gap, WA 98903</text_data><comment_date>2017-10-19T00:00:00</comment_date></row><row _id="row-6age-anys-spb3" _uuid="00000000-0000-0000-AE17-E33F9D420560" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6age-anys-spb3"><intent_id>500920</intent_id><project_id>661000</project_id><text_data>Employees are owner/operators</text_data><comment_date>2012-02-17T00:00:00</comment_date></row><row _id="row-95dr-8zfn~zawv" _uuid="00000000-0000-0000-C581-0FEB8AA229F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-95dr-8zfn~zawv"><intent_id>640608</intent_id><project_id>734908</project_id><text_data>FIled by Kim Burnside.</text_data><comment_date>2014-07-11T00:00:00</comment_date></row><row _id="row-d4ru.2yka_gzhs" _uuid="00000000-0000-0000-E7C3-58A680CE59F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4ru.2yka_gzhs"><intent_id>1124656</intent_id><project_id>893492</project_id><text_data>I sure hope I got it right this time</text_data><comment_date>2021-03-10T00:00:00</comment_date></row><row _id="row-yefe_6kyr_ymjd" _uuid="00000000-0000-0000-5C4D-F425A60ABA8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yefe_6kyr_ymjd"><intent_id>572560</intent_id><project_id>709419</project_id><text_data>Fringe Breakdown:$15.88---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $8.88 Pension$11.57---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $4.57 Pension</text_data><comment_date>2013-05-31T00:00:00</comment_date></row><row _id="row-86kd_62jm.xnhy" _uuid="00000000-0000-0000-8FD8-7066500DF332" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-86kd_62jm.xnhy"><intent_id>649592</intent_id><project_id>742487</project_id><text_data>Installation of playchips via a 4&amp;quot; hose using a blower truck.</text_data><comment_date>2014-08-21T00:00:00</comment_date></row><row _id="row-vfpc~xs3q_kyab" _uuid="00000000-0000-0000-7C83-799DFD7D1956" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfpc~xs3q_kyab"><intent_id>1176124</intent_id><project_id>973552</project_id><text_data>Job# 2021-002</text_data><comment_date>2021-09-09T00:00:00</comment_date></row><row _id="row-uegg-y555.hqwu" _uuid="00000000-0000-0000-7BB5-5BDF45FEBF94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uegg-y555.hqwu"><intent_id>507887</intent_id><project_id>686009</project_id><text_data>Form filed by: Vic Dell - murq235</text_data><comment_date>2012-04-16T00:00:00</comment_date></row><row _id="row-sxee~wdwz-bnvh" _uuid="00000000-0000-0000-50DE-AA68214E5CBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sxee~wdwz-bnvh"><intent_id>584334</intent_id><project_id>715188</project_id><text_data>Install approximately 45 wireless access points</text_data><comment_date>2013-07-30T00:00:00</comment_date></row><row _id="row-b3ty.cfz9-qj3p" _uuid="00000000-0000-0000-85AF-98964CDF215C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b3ty.cfz9-qj3p"><intent_id>584282</intent_id><project_id>716538</project_id><text_data>Job # 182511</text_data><comment_date>2013-07-30T00:00:00</comment_date></row><row _id="row-se3f_gr4a~k2hv" _uuid="00000000-0000-0000-D7EA-BB4444AA3AD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-se3f_gr4a~k2hv"><intent_id>719781</intent_id><project_id>743759</project_id><text_data>1. Select removal and replacement of windows and doors to achieve a sound rating and ducting and supporting electrical to bring in fresh air.2. yes3. 34. a. nob. noc. yesd. noe. nof. nog. noh. noi. noj. nok. no5. yes6. yes7. no8. no</text_data><comment_date>2015-09-09T00:00:00</comment_date></row><row _id="row-vkhw.k7k8_qpf2" _uuid="00000000-0000-0000-3E52-FE164BA2B291" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkhw.k7k8_qpf2"><intent_id>589252</intent_id><project_id>709956</project_id><text_data>Customer Name is Martha Perez address 224 W Barbara RD #19 Othello WA 99344</text_data><comment_date>2013-08-22T00:00:00</comment_date></row><row _id="row-kqbv.ywjc.79aw" _uuid="00000000-0000-0000-5D2A-9580D48BA003" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kqbv.ywjc.79aw"><intent_id>575983</intent_id><project_id>713554</project_id><text_data>MMCI#013409</text_data><comment_date>2013-06-18T00:00:00</comment_date></row><row _id="row-4tki_v347-8dru" _uuid="00000000-0000-0000-B936-C0863A7D6283" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4tki_v347-8dru"><intent_id>947211</intent_id><project_id>849975</project_id><text_data>I will be doing the labor myself because it is a small job.</text_data><comment_date>2018-11-22T00:00:00</comment_date></row><row _id="row-48z7.j5yf~h84f" _uuid="00000000-0000-0000-41EF-6FAE05547DB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48z7.j5yf~h84f"><intent_id>1386877</intent_id><project_id>1100510</project_id><text_data>Mounting, by means of screws, computer networking equipment to existing telecommunications racks, indoors.</text_data><comment_date>2023-12-11T00:00:00</comment_date></row><row _id="row-juxc_ftd4~nrxy" _uuid="00000000-0000-0000-00D4-1967B2D02E47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-juxc_ftd4~nrxy"><intent_id>698697</intent_id><project_id>764040</project_id><text_data>Form filed by:  Donald A. Picard</text_data><comment_date>2015-06-05T00:00:00</comment_date></row><row _id="row-bf87-ezjy~hsyd" _uuid="00000000-0000-0000-382C-3493FD6B14F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bf87-ezjy~hsyd"><intent_id>1114116</intent_id><project_id>945943</project_id><text_data>9856918</text_data><comment_date>2021-01-08T00:00:00</comment_date></row><row _id="row-9say-vmrk-qbb9" _uuid="00000000-0000-0000-91C4-DB7E20FD0367" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9say-vmrk-qbb9"><intent_id>958802</intent_id><project_id>840001</project_id><text_data>Project is exempt from State Prevailing Wage Rates based on the Housing Act of 1937 &amp; 24 CFR 965.101. All workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades/occupations</text_data><comment_date>2019-02-05T00:00:00</comment_date></row><row _id="row-jmw8-2v8w_f848" _uuid="00000000-0000-0000-B2CA-C41C445F9702" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jmw8-2v8w_f848"><intent_id>1250165</intent_id><project_id>1022490</project_id><text_data>Timbercrest Middle School19115 215th Way NEWoodinville, WA 98077-7191Invoice 35418200</text_data><comment_date>2022-07-19T00:00:00</comment_date></row><row _id="row-9248-edar_feyn" _uuid="00000000-0000-0000-35EF-BF1BC3A07FEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9248-edar_feyn"><intent_id>1193264</intent_id><project_id>985934</project_id><text_data>1. Replace bath fan &amp; switch2. Single Family Dwelling3. 14. a. No; b. No; c. Yes; d. No; e. No; f. No; g. No; h. No; i. No; j. No; k. No; l. No5. Yes6. Yes7. No8. No</text_data><comment_date>2021-11-15T00:00:00</comment_date></row><row _id="row-6fch-gz8n~prk7" _uuid="00000000-0000-0000-ED26-6B8340AFE128" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6fch-gz8n~prk7"><intent_id>701503</intent_id><project_id>764768</project_id><text_data>1.Restoration 2.apartment 3.two 4a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.n/a5.yes 6.yes 7.yes 8.no</text_data><comment_date>2015-06-17T00:00:00</comment_date></row><row _id="row-pfkc.cwe5_5vpp" _uuid="00000000-0000-0000-35E9-194284AE83B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pfkc.cwe5_5vpp"><intent_id>823029</intent_id><project_id>798297</project_id><text_data>No employees will perform work</text_data><comment_date>2017-03-27T00:00:00</comment_date></row><row _id="row-kivr_c86q_6vkw" _uuid="00000000-0000-0000-C078-295A2DC3562A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kivr_c86q_6vkw"><intent_id>1006278</intent_id><project_id>892898</project_id><text_data>USING A SOD CUTTER TO REMOVE GRASS AND PREPARING GROUND FOR LANDSCAPE CURBING. MIX CONCRETE AND USE POWER CARRIERS AND THEN CUSTOM MACHINE TO INSTALL LANDSCAPE CURBING. USE HAND TOOLS TO FINISH CURBING. &amp; CLEAN UP</text_data><comment_date>2019-09-11T00:00:00</comment_date></row><row _id="row-p93z~a7f5~pxrv" _uuid="00000000-0000-0000-18BD-22AAEB4C884B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p93z~a7f5~pxrv"><intent_id>621113</intent_id><project_id>705310</project_id><text_data>Beautification of area adjacent to trail through the installation of grass.Hydroseeder, hand tools</text_data><comment_date>2014-03-20T00:00:00</comment_date></row><row _id="row-ya92.6z9m-zyz3" _uuid="00000000-0000-0000-ADE8-FBAE160C17FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ya92.6z9m-zyz3"><intent_id>644371</intent_id><project_id>740178</project_id><text_data>We will not be using general laborers on this job.</text_data><comment_date>2014-07-31T00:00:00</comment_date></row><row _id="row-nj2s-q2ra-7v6q" _uuid="00000000-0000-0000-E2C9-47A5B721B8DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nj2s-q2ra-7v6q"><intent_id>1084041</intent_id><project_id>880037</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and 2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2020-08-28T00:00:00</comment_date></row><row _id="row-w3v8_zq3r_xyws" _uuid="00000000-0000-0000-F716-6154FF0A60C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w3v8_zq3r_xyws"><intent_id>459842</intent_id><project_id>666156</project_id><text_data>The other truck is our water truck, less than 4,000 gallons used for dust control.</text_data><comment_date>2011-06-09T00:00:00</comment_date></row><row _id="row-f27d-yzgv-j7nv" _uuid="00000000-0000-0000-D184-15305EEAD8DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f27d-yzgv-j7nv"><intent_id>472712</intent_id><project_id>669936</project_id><text_data>BRIAR GROUP INC. WILL BE PROVDING HYDROSEEDING SERVICES ONLY.</text_data><comment_date>2011-08-17T00:00:00</comment_date></row><row _id="row-cbx7-xva3.8tka" _uuid="00000000-0000-0000-DB89-7E9C35B16CB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cbx7-xva3.8tka"><intent_id>539759</intent_id><project_id>695250</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-18T00:00:00</comment_date></row><row _id="row-w5v5-td9j-zq57" _uuid="00000000-0000-0000-6328-21E2A926BE23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w5v5-td9j-zq57"><intent_id>1262472</intent_id><project_id>1015289</project_id><text_data>223715-Telecommunications Technicians will be installing cabling for telephones and computers.  Electronic Technicians will be installing cabling for cameras.  Cables will run indoors and outdoors.  Terminate, test and label.</text_data><comment_date>2022-08-30T00:00:00</comment_date></row><row _id="row-ub3g-b4k6~eavd" _uuid="00000000-0000-0000-2EB9-90357CCE2DB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ub3g-b4k6~eavd"><intent_id>1218458</intent_id><project_id>1004037</project_id><text_data>reported wage reflects last years wage but prevailing wages are listed for this year.</text_data><comment_date>2022-03-16T00:00:00</comment_date></row><row _id="row-56hq_7kz9-4c5u" _uuid="00000000-0000-0000-BD14-C8492AC306BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-56hq_7kz9-4c5u"><intent_id>721950</intent_id><project_id>772899</project_id><text_data>Installed Bird Netting at High School per contract.  Install 3/4 inch bird netting above concession above and behind also including shop and Maintenance area in back of high school to prevent birds from perching and nesting.  Cleaned all nests and droppings. Tools used, power sprayer, general hand tools.</text_data><comment_date>2015-10-07T00:00:00</comment_date></row><row _id="row-4hep-7bg8.4pfi" _uuid="00000000-0000-0000-C6C1-E2EA2B96233A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4hep-7bg8.4pfi"><intent_id>987089</intent_id><project_id>885388</project_id><text_data>06/25/2019#S17-92401-401Celsa Beltran7471 Road 170, #G7Basin City, WA 99343509-845-7010, 509-531-372906/26/2019#S17-92401-401Marly Diaz203106 E Bowles Rd, #30Kennewick, WA 99337509-619-8506#1 - whole house exhaust fans, electrical repairs#2 - single family dwellings#3 - one and two story#4(a) - no#4(b) - no#4(c) - yes#4(d) - no#4(e) - no#4(f) - no#4(g) - no#4(h) - no#4(i) - no#4(j) - no#4(k) - no#4(l) - n/a#5 - yes#6 - yes#7 - in some of the homes that are located in mobile home parks#8 - no</text_data><comment_date>2019-06-27T00:00:00</comment_date></row><row _id="row-39fw_ivre-mhdq" _uuid="00000000-0000-0000-B62C-9615E179A045" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39fw_ivre-mhdq"><intent_id>598477</intent_id><project_id>715064</project_id><text_data>Business License No. CUTALCS011JB, UBI Account No. 601-931-309</text_data><comment_date>2013-10-09T00:00:00</comment_date></row><row _id="row-wn6u-sssp.b285" _uuid="00000000-0000-0000-1873-EAED82C329B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wn6u-sssp.b285"><intent_id>830232</intent_id><project_id>819601</project_id><text_data>1)We were contracted to replace a gas furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-05-02T00:00:00</comment_date></row><row _id="row-ea3u_zjgi_g2wy" _uuid="00000000-0000-0000-8E8A-5BAE85C93D9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ea3u_zjgi_g2wy"><intent_id>1224034</intent_id><project_id>1007552</project_id><text_data>New intent to replace Intent 1151919 for the 2021 1-year extension of contract 20-50-07 HWD HQ</text_data><comment_date>2022-04-07T00:00:00</comment_date></row><row _id="row-52nv-id44~veyg" _uuid="00000000-0000-0000-2254-1E194C12C70F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-52nv-id44~veyg"><intent_id>672924</intent_id><project_id>748382</project_id><text_data>guttersyes single2housingno ano byes cno dno eno fno g no hno I no jno kyes 5yes 6no 7no 8</text_data><comment_date>2015-01-09T00:00:00</comment_date></row><row _id="row-xk5y.4b6t-u5dy" _uuid="00000000-0000-0000-4E4D-2E6096F60962" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xk5y.4b6t-u5dy"><intent_id>638542</intent_id><project_id>721685</project_id><text_data>Meadow Brook Bridge PO #01</text_data><comment_date>2014-07-01T00:00:00</comment_date></row><row _id="row-6y7g~h2qw-y7j4" _uuid="00000000-0000-0000-4E91-0BC3974E54A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6y7g~h2qw-y7j4"><intent_id>947447</intent_id><project_id>867218</project_id><text_data>This is an old contract originally awarded to Coatings Unlimited, Inc. which was sold as of 9/26/2018. Industrial Coatings Unlimited, LLC has taken over this contract. The original Intent filed by Coatings Unlimited is 654528 &amp; the Affidavit filed is 822026. King County did not issue a new bid due date or contract award date.</text_data><comment_date>2018-12-06T00:00:00</comment_date></row><row _id="row-dgft-hrhy-qzg3" _uuid="00000000-0000-0000-76BE-890DE518063A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgft-hrhy-qzg3"><intent_id>704909</intent_id><project_id>754614</project_id><text_data>Fringe Breakdown:$14.57---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $7.57 Pension$10.49---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $3.49 Pension</text_data><comment_date>2015-07-02T00:00:00</comment_date></row><row _id="row-x82h~xqbc.z6bf" _uuid="00000000-0000-0000-DC3D-6C9D14A86D09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x82h~xqbc.z6bf"><intent_id>845126</intent_id><project_id>819956</project_id><text_data>*ECB Corp dba Omniduct Systems**ECB Corp is a fabrication shop only and does not require a contractor�s license***All work is performed off-site in shop at 1515 75th St SW, Everett, WA</text_data><comment_date>2017-07-05T00:00:00</comment_date></row><row _id="row-mjy5_csqx_hyic" _uuid="00000000-0000-0000-7602-32326E6F8182" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mjy5_csqx_hyic"><intent_id>738225</intent_id><project_id>740544</project_id><text_data>Previously filed under intent #643635 but have been informed this was the incorrect number. Having to refile intent under this intent ID #.</text_data><comment_date>2015-12-17T00:00:00</comment_date></row><row _id="row-gnb8_udnf~6tjw" _uuid="00000000-0000-0000-6BDC-C2FAAA1E2C3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gnb8_udnf~6tjw"><intent_id>606441</intent_id><project_id>724719</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-12-02T00:00:00</comment_date></row><row _id="row-j5fp.nkwf_fsxx" _uuid="00000000-0000-0000-291D-B2837C0DD059" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j5fp.nkwf_fsxx"><intent_id>839149</intent_id><project_id>808510</project_id><text_data>Filed by Delilah Glenn.</text_data><comment_date>2017-06-08T00:00:00</comment_date></row><row _id="row-qhde.eswz-ma6s" _uuid="00000000-0000-0000-099E-69C01679FBB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qhde.eswz-ma6s"><intent_id>1107285</intent_id><project_id>942082</project_id><text_data>6059319 - Preconstruction</text_data><comment_date>2020-12-03T00:00:00</comment_date></row><row _id="row-9bwj_dud6_c4ea" _uuid="00000000-0000-0000-2FDF-47ADDA317C7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9bwj_dud6_c4ea"><intent_id>832548</intent_id><project_id>820527</project_id><text_data>Other Trucks = water truck</text_data><comment_date>2017-05-15T00:00:00</comment_date></row><row _id="row-24md-ugwc_kwef" _uuid="00000000-0000-0000-3112-D7B76182C891" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-24md-ugwc_kwef"><intent_id>716429</intent_id><project_id>759096</project_id><text_data>Filed by Hernan Arcos</text_data><comment_date>2015-08-25T00:00:00</comment_date></row><row _id="row-aakk~w4im-aftg" _uuid="00000000-0000-0000-608F-6291310893EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aakk~w4im-aftg"><intent_id>932483</intent_id><project_id>851081</project_id><text_data>Job #18114</text_data><comment_date>2018-09-12T00:00:00</comment_date></row><row _id="row-vabv.r82m.tr85" _uuid="00000000-0000-0000-3941-2674C1C4DE9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vabv.r82m.tr85"><intent_id>616096</intent_id><project_id>729062</project_id><text_data>#1 Install bathroom exhaust fans #2 Single family dwelling #3 one #4 a. no b. no c. yes d. no e. no f. no g. no h. no i. no j. no k. no #5 yes #6 yes #7 no #8 no</text_data><comment_date>2014-02-12T00:00:00</comment_date></row><row _id="row-zzrn~575c.hhec" _uuid="00000000-0000-0000-5CB3-CF678C171C46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zzrn~575c.hhec"><intent_id>810511</intent_id><project_id>803469</project_id><text_data>162318-Per WAC 296-127-01322 Electronic Technicians will be installing cabling for cameras.  Terminate, test and label.  Cables will run indoors.</text_data><comment_date>2017-01-10T00:00:00</comment_date></row><row _id="row-yb8c_5nvz~zuef" _uuid="00000000-0000-0000-2702-7CE56EED3179" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yb8c_5nvz~zuef"><intent_id>1199833</intent_id><project_id>966231</project_id><text_data>The material being spread is not concrete, Shotcrete or Gunite. The material is not under high pressure, it is not a water blaster or a vacuum blaster and we are not performing any green cutting with high pressure water &amp; high pressure air.Our duties for a project are to bring playground wood chip material in our truck to a facility where everything is marked and ready for Swanson employee(s) to take a hose and blow the playground chips on existing playgrounds where they tell us. Once the playground chips are spread out on the playground surface we use a blower similar to a leaf blower to clean up the area around the playground surface.We may use one of two trucks: Truck &amp; Trailer � Truck = Kenworth T-800 4 axle Trailer = IMCO live floor trailer 48� Truck � Freightliner FL80 2 rear axles</text_data><comment_date>2021-12-16T00:00:00</comment_date></row><row _id="row-bdh5-dat5~2s6r" _uuid="00000000-0000-0000-D313-FB12FDCAABEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bdh5-dat5~2s6r"><intent_id>771334</intent_id><project_id>757680</project_id><text_data>625 NE 2nd StreetGoldendale, WA 98620</text_data><comment_date>2016-06-28T00:00:00</comment_date></row><row _id="row-83tr~f32k.sgxs" _uuid="00000000-0000-0000-08F6-CC1A63EF6BC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-83tr~f32k.sgxs"><intent_id>1156166</intent_id><project_id>956595</project_id><text_data>Gregory Whiteside owner operator &amp; lead carpenter .</text_data><comment_date>2021-06-28T00:00:00</comment_date></row><row _id="row-8sni-hqsi~eph9" _uuid="00000000-0000-0000-935E-D350523A04EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8sni-hqsi~eph9"><intent_id>1317096</intent_id><project_id>1058541</project_id><text_data>: Our general laborers unload and distribute cabinets from our delivery truck to various rooms on the jobsite. The only tools used are hand trucks and rolling carts.Our trucks are 14� and 26� box trucks for delivery of cabinets.</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-43cy_55wk_rkxc" _uuid="00000000-0000-0000-AAAC-D5E9BF5E4D38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-43cy_55wk_rkxc"><intent_id>1163713</intent_id><project_id>955006</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2021-07-27T00:00:00</comment_date></row><row _id="row-7a2z_zqat.3vm3" _uuid="00000000-0000-0000-71F8-FEEEF779FE34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7a2z_zqat.3vm3"><intent_id>991351</intent_id><project_id>887014</project_id><text_data>This job was approved via email dated 12/4/2018 with John Boatman/Brian Warbis/Matt Shaxton/Kelly Moe/Pam Jones.</text_data><comment_date>2019-07-12T00:00:00</comment_date></row><row _id="row-i3bc-kdce_ny3k" _uuid="00000000-0000-0000-42ED-51F4C7A22F4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i3bc-kdce_ny3k"><intent_id>463637</intent_id><project_id>665632</project_id><text_data>NW Sheet Metal Workers Pension  $6.93National Pension Contribution    4.24NW Health Care                   8.68International Training Institute  .17Apprenticeship Fund              1.00Industry Fund                     .60Organizational Trust Fund         .75NW Supplemental Plan              .79Clean Card                        .07</text_data><comment_date>2011-07-27T00:00:00</comment_date></row><row _id="row-6ymr-pe3m.r534" _uuid="00000000-0000-0000-6C32-2513AC886F8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ymr-pe3m.r534"><intent_id>578414</intent_id><project_id>714114</project_id><text_data>Please disregard the above, no fringe paid since this is Prevailing Wage and not Davis Bacon.</text_data><comment_date>2013-08-05T00:00:00</comment_date></row><row _id="row-x9pm.23jn_4xnk" _uuid="00000000-0000-0000-ADA0-C5DB0A9E4692" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x9pm.23jn_4xnk"><intent_id>666800</intent_id><project_id>727605</project_id><text_data>Skanska hired us</text_data><comment_date>2014-11-20T00:00:00</comment_date></row><row _id="row-dfvt~tzdk_u9ku" _uuid="00000000-0000-0000-5B70-0AE4630C7DD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfvt~tzdk_u9ku"><intent_id>1253183</intent_id><project_id>1021177</project_id><text_data>General laborer consists of hand work only (no power tools or equipment) $35.23 base + $8.81 pensionCrane Oiler/Driver is being used for an Oil Distributor. Wage band approach is being utilized per Harvey Means. $39.97 base + $9.99 pensionOther trucks is a 0 to 8000 gallon water truck used to help with compaction and dust control $41.70 base + $10.43 pension</text_data><comment_date>2022-08-10T00:00:00</comment_date></row><row _id="row-ydnn_smcr~rmii" _uuid="00000000-0000-0000-73C7-E49905E53D0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ydnn_smcr~rmii"><intent_id>976544</intent_id><project_id>874135</project_id><text_data>1.Install Residential gutter and downspouts2.Apartments 3.1 Story4.housing 5.Yes6.Yes7.a. Nob.noc.nod.noe.nof.nog.no.h.noi.noj.noQuestions are answered to the best of our knowledge,we are just the subcontractor for the project</text_data><comment_date>2019-05-08T00:00:00</comment_date></row><row _id="row-3g8a_ejb7~w5en" _uuid="00000000-0000-0000-24B7-1902620BB744" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3g8a_ejb7~w5en"><intent_id>718624</intent_id><project_id>771503</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2015-09-02T00:00:00</comment_date></row><row _id="row-7pf7~76bx.22up" _uuid="00000000-0000-0000-E642-B680855EB71A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7pf7~76bx.22up"><intent_id>1241097</intent_id><project_id>1009577</project_id><text_data>SPM #27011</text_data><comment_date>2022-06-14T00:00:00</comment_date></row><row _id="row-iumy.ad3w~uz2n" _uuid="00000000-0000-0000-4AC8-15EAD36FBF4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iumy.ad3w~uz2n"><intent_id>595409</intent_id><project_id>719995</project_id><text_data>Install irrigation and plant trees.</text_data><comment_date>2013-09-23T00:00:00</comment_date></row><row _id="row-knvr.b7ii~cz8d" _uuid="00000000-0000-0000-EF01-D413EFD7332D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knvr.b7ii~cz8d"><intent_id>660024</intent_id><project_id>746499</project_id><text_data>Form filed by:  Tila Reynolds</text_data><comment_date>2014-10-13T00:00:00</comment_date></row><row _id="row-zy92-ycrg~gpvq" _uuid="00000000-0000-0000-DEB5-B0E5D96A02D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zy92-ycrg~gpvq"><intent_id>717216</intent_id><project_id>770524</project_id><text_data>Job # 103954-001 related to # 200864-001</text_data><comment_date>2015-08-27T00:00:00</comment_date></row><row _id="row-efz5~5q5g-ynq6" _uuid="00000000-0000-0000-5308-16C6DAA92084" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efz5~5q5g-ynq6"><intent_id>688366</intent_id><project_id>759663</project_id><text_data>we are hand weeding around plants 18 inches. Removal of reed canary grasses out by hand in ponds. Placing mulch around smaller plants by hand 18 inches by 2 inches (rings)</text_data><comment_date>2015-04-09T00:00:00</comment_date></row><row _id="row-ztcw-6x39~w7vg" _uuid="00000000-0000-0000-7AEE-1ED8AD621D55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ztcw-6x39~w7vg"><intent_id>569356</intent_id><project_id>708465</project_id><text_data>Form filed by: Larry D Andersen</text_data><comment_date>2013-05-13T00:00:00</comment_date></row><row _id="row-6hyk.pryy~4r5i" _uuid="00000000-0000-0000-73E4-C50DC41ADA58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6hyk.pryy~4r5i"><intent_id>623114</intent_id><project_id>729769</project_id><text_data>No employees will be used on this job.</text_data><comment_date>2014-04-02T00:00:00</comment_date></row><row _id="row-tiun~c8rt~xser" _uuid="00000000-0000-0000-BA81-B9442EDD8968" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tiun~c8rt~xser"><intent_id>1205251</intent_id><project_id>995640</project_id><text_data>1121652</text_data><comment_date>2022-01-18T00:00:00</comment_date></row><row _id="row-mrzw.y69v_yrkd" _uuid="00000000-0000-0000-B463-2C6AB9D8AC86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrzw.y69v_yrkd"><intent_id>872283</intent_id><project_id>836392</project_id><text_data>This work was done on the Prosser Campus</text_data><comment_date>2017-10-31T00:00:00</comment_date></row><row _id="row-dydt_gh75~hi8p" _uuid="00000000-0000-0000-FADB-B69704F23B59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dydt_gh75~hi8p"><intent_id>913944</intent_id><project_id>849710</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY</text_data><comment_date>2018-06-26T00:00:00</comment_date></row><row _id="row-8u96.jqbk_juxc" _uuid="00000000-0000-0000-0FB1-1E8C7EB381DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8u96.jqbk_juxc"><intent_id>1079747</intent_id><project_id>928849</project_id><text_data>Chris Tomulty  707 E 1st St, Ellensburg</text_data><comment_date>2020-08-12T00:00:00</comment_date></row><row _id="row-3fdr-vsvy.pc5d" _uuid="00000000-0000-0000-AA52-19430EF29AEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3fdr-vsvy.pc5d"><intent_id>628763</intent_id><project_id>733322</project_id><text_data>Form filed by: Calvin Carlson</text_data><comment_date>2014-05-08T00:00:00</comment_date></row><row _id="row-t9ei-gh7c-q5mg" _uuid="00000000-0000-0000-9C61-317BF3F1577C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9ei-gh7c-q5mg"><intent_id>1288638</intent_id><project_id>1040513</project_id><text_data>25SD6447</text_data><comment_date>2022-12-08T00:00:00</comment_date></row><row _id="row-kf2y.n5px~wv4t" _uuid="00000000-0000-0000-8B20-301515652D35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kf2y.n5px~wv4t"><intent_id>678781</intent_id><project_id>755509</project_id><text_data>Form filed by:  Grant Williamson</text_data><comment_date>2015-02-11T00:00:00</comment_date></row><row _id="row-e84m_9kcn.qesq" _uuid="00000000-0000-0000-7B92-1F25CFC85FDC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e84m_9kcn.qesq"><intent_id>945055</intent_id><project_id>866169</project_id><text_data>1. Install Ductless Heat Pump.2. Single family dwellings.3. One4.a) no   b) no   c) yes   d) no   e) no   f) no   g) no   h) no   I) no   j) no5. Yes6. Yes7. No8. No</text_data><comment_date>2018-11-09T00:00:00</comment_date></row><row _id="row-cyvu.buhz.n57a" _uuid="00000000-0000-0000-778E-6053AE9B3B76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cyvu.buhz.n57a"><intent_id>1491622</intent_id><project_id>1159247</project_id><text_data>Project# 05573, Hayes, Sharon, 3621 E 11th Ave, Spokane, WA 99202</text_data><comment_date>2024-12-13T00:00:00</comment_date></row><row _id="row-bt67~gfje-2xk6" _uuid="00000000-0000-0000-55F7-A225655BF68A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bt67~gfje-2xk6"><intent_id>1497735</intent_id><project_id>1163082</project_id><text_data>240213</text_data><comment_date>2024-12-30T00:00:00</comment_date></row><row _id="row-yn7m-5ryq~c8tz" _uuid="00000000-0000-0000-3AE9-88BD91762198" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yn7m-5ryq~c8tz"><intent_id>1497547</intent_id><project_id>1162956</project_id><text_data>JCI Project ID 5N59-0251-Subcontractor EC Company UBI 601107330</text_data><comment_date>2024-12-30T00:00:00</comment_date></row><row _id="row-mqxw-3j82_p35s" _uuid="00000000-0000-0000-B0F5-A7DB0C9FDF0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mqxw-3j82_p35s"><intent_id>1497573</intent_id><project_id>1162971</project_id><text_data>RR 2412128</text_data><comment_date>2024-12-30T00:00:00</comment_date></row><row _id="row-3vnp_swd9_khhw" _uuid="00000000-0000-0000-BD95-FD85D64C54D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vnp_swd9_khhw"><intent_id>695340</intent_id><project_id>762253</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2015-05-20T00:00:00</comment_date></row><row _id="row-hr4x.ytgk_2hbh" _uuid="00000000-0000-0000-8566-FF4E8546AB3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hr4x.ytgk_2hbh"><intent_id>477392</intent_id><project_id>674192</project_id><text_data>Please note this Intent replaces Intent 472392 approved 08/31/11 in order to add additional job classifications.</text_data><comment_date>2011-09-12T00:00:00</comment_date></row><row _id="row-dcw8~sc57.h8cd" _uuid="00000000-0000-0000-1511-571BBD59ACC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dcw8~sc57.h8cd"><intent_id>669898</intent_id><project_id>747795</project_id><text_data>ALL MANUFACTURING WORK OF CUSTOM PRODUCT IS PERFORMED OFF-SITE IN SPOKANE VALLEY, WA.  ANY ON-SITE PRESENCE ARE PROFESSIONAL SERVICES RELATED TO THE TECHNICAL SUPPORT OF THE PRODUCT AND IS NOT SUBJECT TO PREVAILING WAGE.</text_data><comment_date>2014-12-15T00:00:00</comment_date></row><row _id="row-fw7v-c48i.c3fw" _uuid="00000000-0000-0000-0961-AD9880AA3027" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fw7v-c48i.c3fw"><intent_id>743592</intent_id><project_id>783618</project_id><text_data>sr34414800</text_data><comment_date>2016-01-26T00:00:00</comment_date></row><row _id="row-z8z8.u2is~nxb6" _uuid="00000000-0000-0000-016B-8A62EFD75A13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z8z8.u2is~nxb6"><intent_id>1205555</intent_id><project_id>995833</project_id><text_data>An Elm at the UW main campus had a large branch fail unexpectedly in the snow. The large branch had been held up by a cable that had been installed previously. The cable held the failed branch but had to be repaired. The UW had the branch pruned using their crew. Our 2 employees climbed the tree using ropes and saddles to repair the flexible dynamic cable system by installing a new system. There was not actually any brushcutting but labor was performed. The work was done to repair the cabling system so the tree could be preserved.</text_data><comment_date>2022-02-03T00:00:00</comment_date></row><row _id="row-8kf3~w6sv.e45q" _uuid="00000000-0000-0000-93FA-7326786894EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8kf3~w6sv.e45q"><intent_id>887572</intent_id><project_id>843364</project_id><text_data>(14) trees were planted along the NW quadrant of SR500 and 164th Ave Interchange(2) trees were planted within 164th and 138th Ave center median.</text_data><comment_date>2018-02-09T00:00:00</comment_date></row><row _id="row-bv3g_k5ga~29hq" _uuid="00000000-0000-0000-4E1A-14A9BB02F7C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bv3g_k5ga~29hq"><intent_id>534843</intent_id><project_id>692435</project_id><text_data>8.16 - Medical11.04 - Pensions1.93 - Apprentice Training</text_data><comment_date>2012-09-19T00:00:00</comment_date></row><row _id="row-2e9c_whth-6euf" _uuid="00000000-0000-0000-CAA1-60A563EDA456" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2e9c_whth-6euf"><intent_id>517351</intent_id><project_id>688421</project_id><text_data>Filed by: Kim Burnside</text_data><comment_date>2012-06-18T00:00:00</comment_date></row><row _id="row-qts5~vrjv~8tm5" _uuid="00000000-0000-0000-FFD3-D25533AC401D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qts5~vrjv~8tm5"><intent_id>605190</intent_id><project_id>714102</project_id><text_data>Filed by Randy Roosendaal.</text_data><comment_date>2013-11-19T00:00:00</comment_date></row><row _id="row-s3g7_73wk_azrp" _uuid="00000000-0000-0000-2F22-1D2EAE9146ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s3g7_73wk_azrp"><intent_id>802293</intent_id><project_id>807620</project_id><text_data>Relocate 16 voice/data cables that are used for either telephone (voice over distance) or data (bits and bytes) connection within the telecommunication system from old locations to new locations.  All work to be performed indoors.</text_data><comment_date>2016-11-18T00:00:00</comment_date></row><row _id="row-238n-yqtj~sm2u" _uuid="00000000-0000-0000-2095-7CDA55EC4D61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-238n-yqtj~sm2u"><intent_id>1017839</intent_id><project_id>863363</project_id><text_data>Applied post emergent non selective weed control on the frontage road along I-5 corridor.</text_data><comment_date>2019-10-25T00:00:00</comment_date></row><row _id="row-3tph~hzja~4hdn" _uuid="00000000-0000-0000-A49D-B1B3781EE9BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3tph~hzja~4hdn"><intent_id>706176</intent_id><project_id>766815</project_id><text_data>302011</text_data><comment_date>2015-07-08T00:00:00</comment_date></row><row _id="row-mjhb~j66a.qq5w" _uuid="00000000-0000-0000-9A93-A37BE364E86F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mjhb~j66a.qq5w"><intent_id>582276</intent_id><project_id>715856</project_id><text_data>These various Pierce County family homes with a total of 4 units. Each home has a kitchen and at least one bathroom and is considered a permanent residence for all its tenants. These buildings are no more than two stories in height. The electricians will be replacing fans. This job meets the residential job requirements.</text_data><comment_date>2013-07-19T00:00:00</comment_date></row><row _id="row-ih98.cnvt-gbmc" _uuid="00000000-0000-0000-9032-53225E654C4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ih98.cnvt-gbmc"><intent_id>961110</intent_id><project_id>871212</project_id><text_data>General Labor work consists of hand work (shovel work).  No power equipment or power tools. Pilot car is used for mobilizng heavy equipment to and from the project site. Motor Patrol Grader is used for grading the project site for compaction before paving operations. Other trucks consist of one (1) 0-8,000 gallon water truck used for distribution of water during the grading process to help with compaction.</text_data><comment_date>2019-02-20T00:00:00</comment_date></row><row _id="row-9ziu_tcfr~rxpd" _uuid="00000000-0000-0000-F1C2-97B4E5ED2678" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ziu_tcfr~rxpd"><intent_id>896511</intent_id><project_id>815384</project_id><text_data>Job 172101</text_data><comment_date>2018-04-03T00:00:00</comment_date></row><row _id="row-fjvp-is2s~nzm2" _uuid="00000000-0000-0000-61CF-CD5C82046BC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fjvp-is2s~nzm2"><intent_id>1256921</intent_id><project_id>1024105</project_id><text_data>Fairbanks Hired us</text_data><comment_date>2022-08-10T00:00:00</comment_date></row><row _id="row-t2uc~j346-qkbs" _uuid="00000000-0000-0000-736A-98B8F4BF21C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t2uc~j346-qkbs"><intent_id>1151722</intent_id><project_id>966205</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2021-06-11T00:00:00</comment_date></row><row _id="row-n8r7~3e4y_ymiz" _uuid="00000000-0000-0000-0C68-F65153A3DE7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n8r7~3e4y_ymiz"><intent_id>900948</intent_id><project_id>843848</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2018-04-26T00:00:00</comment_date></row><row _id="row-vvxu_79nc_7jgk" _uuid="00000000-0000-0000-69A0-34A687787539" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vvxu_79nc_7jgk"><intent_id>922118</intent_id><project_id>855026</project_id><text_data>0318044</text_data><comment_date>2018-07-31T00:00:00</comment_date></row><row _id="row-ks4x_w9hv-b42m" _uuid="00000000-0000-0000-E7C4-A17A3C4D3E59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ks4x_w9hv-b42m"><intent_id>781879</intent_id><project_id>797548</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2016-08-12T00:00:00</comment_date></row><row _id="row-5d2w~wnhw~fy3e" _uuid="00000000-0000-0000-8467-BC720FD4C8A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5d2w~wnhw~fy3e"><intent_id>841687</intent_id><project_id>824836</project_id><text_data>Replace seal in leaking lift.</text_data><comment_date>2017-06-19T00:00:00</comment_date></row><row _id="row-ubd7.35by-ncqh" _uuid="00000000-0000-0000-EA32-ABA5C64E42F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ubd7.35by-ncqh"><intent_id>692152</intent_id><project_id>735243</project_id><text_data>A new track &amp; field &amp; parking lot.Abel Curbing is doing the extruded curb &amp; stripingOur general laborer will be installing curb with a curb machine</text_data><comment_date>2015-05-13T00:00:00</comment_date></row><row _id="row-zjc6~xfvu-qtg4" _uuid="00000000-0000-0000-1D6F-C9E37AB01C47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zjc6~xfvu-qtg4"><intent_id>1273459</intent_id><project_id>1034693</project_id><text_data>INV # 89186518 SR # 53113378</text_data><comment_date>2022-10-10T00:00:00</comment_date></row><row _id="row-tg53.qkm9.w67d" _uuid="00000000-0000-0000-ADAB-CFE032C76BE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tg53.qkm9.w67d"><intent_id>973888</intent_id><project_id>864764</project_id><text_data>1-Plastic Laminate Countertops2-Triplexes3-14-a)No, b)No, c)Yes, d)No e) No f) No g)No h)No I)No j)No k)No 5- Yes6- Yes7- No8- No</text_data><comment_date>2019-04-25T00:00:00</comment_date></row><row _id="row-y2v5_s8n2_2w9m" _uuid="00000000-0000-0000-B936-08F35EB70F3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y2v5_s8n2_2w9m"><intent_id>827223</intent_id><project_id>811360</project_id><text_data>Filed by Lorena Gonzales</text_data><comment_date>2017-04-18T00:00:00</comment_date></row><row _id="row-adj6~pqxd_xbmu" _uuid="00000000-0000-0000-D755-6A591487289A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-adj6~pqxd_xbmu"><intent_id>700713</intent_id><project_id>764871</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-06-15T00:00:00</comment_date></row><row _id="row-rsis~gaxm-heze" _uuid="00000000-0000-0000-83CD-CC0E797084FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rsis~gaxm-heze"><intent_id>944584</intent_id><project_id>865972</project_id><text_data>Note: Workers who perform work on the electrical side of generators (for example, this includes - but is not limited to - load, battery, and transfer tests) must be compensated at the Inside Wireman Electrician/Journey Level (WAC 296-127-01323) prevailing rate of wage for this work. You must specify the nature of the work performed on this generator when filing the Affidavit and keep time records of start/stop times within each classification that are available upon request.</text_data><comment_date>2019-01-20T00:00:00</comment_date></row><row _id="row-kwse-gej3_qe3m" _uuid="00000000-0000-0000-D6D6-999DD86339F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kwse-gej3_qe3m"><intent_id>687246</intent_id><project_id>759179</project_id><text_data>Filed by Linda Burke</text_data><comment_date>2015-04-03T00:00:00</comment_date></row><row _id="row-y8rg_dpab-7crs" _uuid="00000000-0000-0000-1A8E-17D4209E5531" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8rg_dpab-7crs"><intent_id>727468</intent_id><project_id>775073</project_id><text_data>The work is associated with ISP and to run computers.</text_data><comment_date>2015-11-03T00:00:00</comment_date></row><row _id="row-p9ap_kunc-996q" _uuid="00000000-0000-0000-F3D2-2719A6FA53C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p9ap_kunc-996q"><intent_id>910602</intent_id><project_id>850982</project_id><text_data>3180044 - UTC Lacey</text_data><comment_date>2018-06-12T00:00:00</comment_date></row><row _id="row-axsp_xfu5-9ft4" _uuid="00000000-0000-0000-568F-E5388441E03D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-axsp_xfu5-9ft4"><intent_id>510233</intent_id><project_id>686960</project_id><text_data>We are going to install one master meter to combine 28 meters into one.</text_data><comment_date>2012-05-08T00:00:00</comment_date></row><row _id="row-fsyb-steu.i29n" _uuid="00000000-0000-0000-E2DC-804F43B71656" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fsyb-steu.i29n"><intent_id>657523</intent_id><project_id>733346</project_id><text_data>TELECOMMUNICATION TECHNICIANS WORK DESCRIPTIONProvide and install network and telephone cable between instruments, terminals and sets and the connections to the distribution cable.Provide and install Blocks and Subpanels where large feed cables terminate at the distribution frames in the IDF or MDFProvide and install riser cables between floors from the MDF to the IDFLabel and test the cableINDOOR INSTALLATION</text_data><comment_date>2014-09-29T00:00:00</comment_date></row><row _id="row-rgnm~v94s~4h3y" _uuid="00000000-0000-0000-3D66-E3965B7EED97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rgnm~v94s~4h3y"><intent_id>1040370</intent_id><project_id>909509</project_id><text_data>The purpose of this project is keep all public streets and parks of Newcastle city maintenance looking nice of nature including all public parks.</text_data><comment_date>2020-02-21T00:00:00</comment_date></row><row _id="row-nkwy_j3u3_kdnq" _uuid="00000000-0000-0000-3536-8D0050752888" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nkwy_j3u3_kdnq"><intent_id>924373</intent_id><project_id>858251</project_id><text_data>#20149, Blimka, Peggy 615 S Greene, Spokane#20174, Kendall, Joan 3408 W Francis, Spokane</text_data><comment_date>2018-08-09T00:00:00</comment_date></row><row _id="row-ihv4~vgxq.ne77" _uuid="00000000-0000-0000-CC7A-2269E2BD3BE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihv4~vgxq.ne77"><intent_id>801273</intent_id><project_id>802989</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2016-12-02T00:00:00</comment_date></row><row _id="row-p954-4sk6-m9ca" _uuid="00000000-0000-0000-EC9C-93BBE0E28E7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p954-4sk6-m9ca"><intent_id>961909</intent_id><project_id>874013</project_id><text_data>1. Repairs to residential structures.2. Yes3. 14. A-No, B-No, C-Yes, D-No, E-No, F-No, G-No, H-No, I-No, J-No, K-No, I-No5. Yes6. Yes7. No8. No</text_data><comment_date>2019-02-25T00:00:00</comment_date></row><row _id="row-8bhs.vj9y.uz2f" _uuid="00000000-0000-0000-5089-F3D68166883D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8bhs.vj9y.uz2f"><intent_id>538075</intent_id><project_id>690255</project_id><text_data>We only planted 340 live stakes.  No equipment used at all.  No topsoil, no bark, no compost.</text_data><comment_date>2012-10-03T00:00:00</comment_date></row><row _id="row-8gn6_5wuz_4n7b" _uuid="00000000-0000-0000-F0EF-ED430A791893" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8gn6_5wuz_4n7b"><intent_id>620153</intent_id><project_id>727078</project_id><text_data>Semi-Tractor with trailer.  Trailer is 70 CY end dump.</text_data><comment_date>2014-03-13T00:00:00</comment_date></row><row _id="row-3f9m_m8we.grbi" _uuid="00000000-0000-0000-40E1-BFA7374326E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3f9m_m8we.grbi"><intent_id>476018</intent_id><project_id>673696</project_id><text_data>The scope of work for this project is to install copper cables for voice.</text_data><comment_date>2011-09-01T00:00:00</comment_date></row><row _id="row-fxt9.i9ik.5dhe" _uuid="00000000-0000-0000-BD31-0AC90BEE136E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fxt9.i9ik.5dhe"><intent_id>1317608</intent_id><project_id>1060261</project_id><text_data>Erect scaffold. 2. Apartments 3. 3 4. (a)no (b) no (c) yes (d) no (e) no (f) not sure, site says communal shared kitchen area (g) no (h) no (i) no (j) no (k) yes (l) no 5. yes 6. yes 7. yes 8. no</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-5hif_f7xt~haxw" _uuid="00000000-0000-0000-0BF0-573AFF0D418B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5hif_f7xt~haxw"><intent_id>822436</intent_id><project_id>816367</project_id><text_data>Install energy efficiency light fixtures in offices.  Replace and install energy efficiency bulbs.</text_data><comment_date>2017-03-31T00:00:00</comment_date></row><row _id="row-7n34~8kbz.v5gf" _uuid="00000000-0000-0000-9B00-CB751DF5ABB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7n34~8kbz.v5gf"><intent_id>897083</intent_id><project_id>842015</project_id><text_data>Melissa Osburne   PO # 452912015 6th Ave #150AClarkston  18-0505</text_data><comment_date>2018-04-05T00:00:00</comment_date></row><row _id="row-ehp7.fki6.u7d5" _uuid="00000000-0000-0000-490E-9018E34B3F23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ehp7.fki6.u7d5"><intent_id>923837</intent_id><project_id>858042</project_id><text_data>Port Madison Enterprises Construction Corporation is a Native American tribally owned company and not required to have an industrial account number.Truck Drivers - &amp;quot;Other Trucks&amp;quot; for Water Truck</text_data><comment_date>2018-08-07T00:00:00</comment_date></row><row _id="row-tad9_mspu~hbyu" _uuid="00000000-0000-0000-71BC-076B6EDE45C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tad9_mspu~hbyu"><intent_id>922610</intent_id><project_id>852882</project_id><text_data>JCI Project #8N59-0182</text_data><comment_date>2018-08-01T00:00:00</comment_date></row><row _id="row-faad~wrk5-3tqj" _uuid="00000000-0000-0000-CF47-5661744D6684" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-faad~wrk5-3tqj"><intent_id>823477</intent_id><project_id>816814</project_id><text_data>Other Trucks - Equipment Haul using a Kenworth 6x4 Bogie Axle 56,000 GVW Diesel</text_data><comment_date>2017-03-29T00:00:00</comment_date></row><row _id="row-4j2w_ay2k~9a4i" _uuid="00000000-0000-0000-B557-E09C03D64735" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4j2w_ay2k~9a4i"><intent_id>818522</intent_id><project_id>790514</project_id><text_data>Scope of work: repair Crowder Guide, Crowder Chain Guide, Relocate / Modify the Picket Hoist, EA Closure, Channel Lift Panel and Sorting Table.</text_data><comment_date>2017-03-01T00:00:00</comment_date></row><row _id="row-fgxu~d5nm.2cz2" _uuid="00000000-0000-0000-C300-DE370122117F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fgxu~d5nm.2cz2"><intent_id>557532</intent_id><project_id>705574</project_id><text_data>Filed By Daniel Elsom</text_data><comment_date>2013-02-25T00:00:00</comment_date></row><row _id="row-iizy.2bip_pk8u" _uuid="00000000-0000-0000-4A50-23CBB869E4AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iizy.2bip_pk8u"><intent_id>724447</intent_id><project_id>773919</project_id><text_data>Maintenance of Camera System</text_data><comment_date>2015-10-05T00:00:00</comment_date></row><row _id="row-3xrz-haxk~vmeh" _uuid="00000000-0000-0000-D539-C071A291CBAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3xrz-haxk~vmeh"><intent_id>552820</intent_id><project_id>703403</project_id><text_data>This should be King County  and rates are listed for that County, there is no work done in Pierce County...</text_data><comment_date>2013-01-23T00:00:00</comment_date></row><row _id="row-fw6k.z82i~6h86" _uuid="00000000-0000-0000-9DB3-47D6FDE7917A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fw6k.z82i~6h86"><intent_id>658630</intent_id><project_id>738966</project_id><text_data>this intent will replace intent # 642167 filed under the wrong job</text_data><comment_date>2014-10-06T00:00:00</comment_date></row><row _id="row-qf9s-gfmf-sf6g" _uuid="00000000-0000-0000-F059-E69CAAB0B51A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qf9s-gfmf-sf6g"><intent_id>1024008</intent_id><project_id>900631</project_id><text_data>WO #30760 City of Bellevue Eastgate Park Invasives Removal per Ryan Popke Cut at base and remove Ivy, Blackberry, Laurel, Holly and small Alder Saplings						along lower fence on hillside from corner of ball field to bollards between						upper and lower fences heading East.</text_data><comment_date>2019-11-26T00:00:00</comment_date></row><row _id="row-vr72~re46~2mkm" _uuid="00000000-0000-0000-B37B-79DB4CBDE4C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vr72~re46~2mkm"><intent_id>1282674</intent_id><project_id>987781</project_id><text_data>Plumbing 2. Apartment 3.non known of 4.c I think its apartments for people to rent out 5. yes 6. yes 7. not sure 8. dont think so</text_data><comment_date>2022-11-10T00:00:00</comment_date></row><row _id="row-7g7a_uyw6.pmvz" _uuid="00000000-0000-0000-60F8-E95953AEAFD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7g7a_uyw6.pmvz"><intent_id>828101</intent_id><project_id>810552</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2017-04-20T00:00:00</comment_date></row><row _id="row-tq23~hpcu_r9hj" _uuid="00000000-0000-0000-8CD1-1EEDBFE40DE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tq23~hpcu_r9hj"><intent_id>1220781</intent_id><project_id>979047</project_id><text_data>222084- Per WAC-296-127-01378 Telecommunications Technicians will be installing cabling for AP (access points) for internet access. Backbone cabling for connectivity between MDF&amp;IDF's. Cables will be ran indoors. Terminate, test and label.</text_data><comment_date>2022-03-25T00:00:00</comment_date></row><row _id="row-kufh_yyhs-cbf9" _uuid="00000000-0000-0000-5E00-BF0B727CA504" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kufh_yyhs-cbf9"><intent_id>871887</intent_id><project_id>831939</project_id><text_data>Heat &amp; Frost Insulators Non Union $65.68</text_data><comment_date>2017-10-30T00:00:00</comment_date></row><row _id="row-8cfd.gqmm~w57c" _uuid="00000000-0000-0000-AF30-DC4E66B2AFC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8cfd.gqmm~w57c"><intent_id>458922</intent_id><project_id>664030</project_id><text_data>City Hall - 15670 NE 85th St</text_data><comment_date>2011-06-03T00:00:00</comment_date></row><row _id="row-tz5f-bv9f-qu2n" _uuid="00000000-0000-0000-6D08-4B30885C5A8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tz5f-bv9f-qu2n"><intent_id>954258</intent_id><project_id>870334</project_id><text_data>This replaces intent # 951581 as we had to have employees work on this project</text_data><comment_date>2019-01-09T00:00:00</comment_date></row><row _id="row-8z9s_w4sd~zmrp" _uuid="00000000-0000-0000-E598-10D66A0210EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8z9s_w4sd~zmrp"><intent_id>992295</intent_id><project_id>887384</project_id><text_data>Equipment used includes:Forklife, generator, a-frame stand, conveyor belt winder, basic hand tools, chainfalls, chain hoists, nylon straps and belt vulcanizer</text_data><comment_date>2019-07-18T00:00:00</comment_date></row><row _id="row-e2gx-jp3q.3mfa" _uuid="00000000-0000-0000-CF09-5F9255CA6702" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e2gx-jp3q.3mfa"><intent_id>985498</intent_id><project_id>883340</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2019-06-18T00:00:00</comment_date></row><row _id="row-7huq_crws.fbdz" _uuid="00000000-0000-0000-7819-4D53FE48005F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7huq_crws.fbdz"><intent_id>655700</intent_id><project_id>741966</project_id><text_data>other truck = lowboy to transport equipment</text_data><comment_date>2014-09-19T00:00:00</comment_date></row><row _id="row-fun9~bsdh~4z9h" _uuid="00000000-0000-0000-9886-6455E3D3C1FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fun9~bsdh~4z9h"><intent_id>508251</intent_id><project_id>686166</project_id><text_data>Filed by: Robin Van Dyke</text_data><comment_date>2012-04-18T00:00:00</comment_date></row><row _id="row-73wf~y9wz_xkma" _uuid="00000000-0000-0000-9BEF-346E6099EAAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73wf~y9wz_xkma"><intent_id>1226900</intent_id><project_id>1009283</project_id><text_data>Our contractors license was for when we were providing electrical work. We are no longer providing those services and a contractors license is not required for janitorial work, which is why we have not renewed the license. Please let me know if we need to provide any more information for this. Thank you.</text_data><comment_date>2022-05-12T00:00:00</comment_date></row><row _id="row-q8d4.z4p4_jdaw" _uuid="00000000-0000-0000-DDC5-8A6034E53033" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8d4.z4p4_jdaw"><intent_id>868493</intent_id><project_id>834901</project_id><text_data>Travel &amp; DiagnosticsGave estimate for repairs</text_data><comment_date>2017-10-11T00:00:00</comment_date></row><row _id="row-626v_svu7~p3eu" _uuid="00000000-0000-0000-13F6-687A929F1246" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-626v_svu7~p3eu"><intent_id>551150</intent_id><project_id>702683</project_id><text_data>Service Call #121130-0030</text_data><comment_date>2013-01-08T00:00:00</comment_date></row><row _id="row-b9n5-6xei.b3tf" _uuid="00000000-0000-0000-6F3A-99B7AB7D3D56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9n5-6xei.b3tf"><intent_id>1061748</intent_id><project_id>920765</project_id><text_data>1520129</text_data><comment_date>2020-06-01T00:00:00</comment_date></row><row _id="row-6xq4~d8ja~j7uq" _uuid="00000000-0000-0000-B507-D2E16D8CF61C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xq4~d8ja~j7uq"><intent_id>713950</intent_id><project_id>769794</project_id><text_data>OTher trucks: Lowboy &amp; Watertruck</text_data><comment_date>2015-08-18T00:00:00</comment_date></row><row _id="row-3t5b~qk5n.wf4u" _uuid="00000000-0000-0000-C63B-A0E4AE281506" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3t5b~qk5n.wf4u"><intent_id>1171341</intent_id><project_id>976122</project_id><text_data>1.   REPLACE EXISTING HVAC AND FURNACE 2. DUPLEX 3.1 4.(A) NO (B) NO (C) YES (D) NO (e)NO (f) NO (g) NO (h)NO (i)NO (j)NO (k)NO (l)NO 5. YES 6. YES 7. NO 8.NO</text_data><comment_date>2021-08-23T00:00:00</comment_date></row><row _id="row-s2cv-9zsn-spgt" _uuid="00000000-0000-0000-FE34-A7E09F8F26C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s2cv-9zsn-spgt"><intent_id>852186</intent_id><project_id>828969</project_id><text_data>Inv #19049 - $1,369.91</text_data><comment_date>2017-08-02T00:00:00</comment_date></row><row _id="row-pje7-8rdm.ua6a" _uuid="00000000-0000-0000-F5BF-F80E2FEAA3CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pje7-8rdm.ua6a"><intent_id>528227</intent_id><project_id>693875</project_id><text_data>Filed By: William Brosseau</text_data><comment_date>2012-08-15T00:00:00</comment_date></row><row _id="row-v3hu_u57s~rwef" _uuid="00000000-0000-0000-199D-886ECE4B63B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3hu_u57s~rwef"><intent_id>612142</intent_id><project_id>727398</project_id><text_data>Residence - Fresh Air Damper and Bath Fan Install: Single family dwelling, one story, bldg is home - no commercial or retail use, permanent residence, no rehab, transitional, communal dining facilities, no treatment services or dorms, no counseling. Each has it's own kitchen and bathroom. There is no manager's or facility managers office on site. There is no use by the public.</text_data><comment_date>2014-01-15T00:00:00</comment_date></row><row _id="row-gbw5-856t_2zr4" _uuid="00000000-0000-0000-B1AF-BF28924420EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbw5-856t_2zr4"><intent_id>809262</intent_id><project_id>810342</project_id><text_data>Per Highline&amp;#39;s request we hand dug out a pole that had been broken off and replaced the pole to match the existing gate.   Highline College PO # 1611022</text_data><comment_date>2017-01-06T00:00:00</comment_date></row><row _id="row-3xqg.ztpt-dfyz" _uuid="00000000-0000-0000-F211-34E1A09B68A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3xqg.ztpt-dfyz"><intent_id>755655</intent_id><project_id>788802</project_id><text_data>1. Install bath fan,Install range hood2. Single family 3. 1 4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2016-04-08T00:00:00</comment_date></row><row _id="row-cgsv-24gq-q96m" _uuid="00000000-0000-0000-7772-DC00FD418853" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cgsv-24gq-q96m"><intent_id>558364</intent_id><project_id>688010</project_id><text_data>Purcell Project 13057</text_data><comment_date>2013-03-01T00:00:00</comment_date></row><row _id="row-pbrz~rqjd.ud79" _uuid="00000000-0000-0000-4A7B-D9C3B48BDF10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbrz~rqjd.ud79"><intent_id>463791</intent_id><project_id>666837</project_id><text_data>011036</text_data><comment_date>2011-07-01T00:00:00</comment_date></row><row _id="row-z5wy-j2uc~ctit" _uuid="00000000-0000-0000-2001-34924D8C7B32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z5wy-j2uc~ctit"><intent_id>676797</intent_id><project_id>754624</project_id><text_data>Corrected to add Laborer Classifications</text_data><comment_date>2015-01-28T00:00:00</comment_date></row><row _id="row-bqr6.ynic-2dzt" _uuid="00000000-0000-0000-0780-B8E2A8758C37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bqr6.ynic-2dzt"><intent_id>693370</intent_id><project_id>761775</project_id><text_data>no</text_data><comment_date>2015-05-07T00:00:00</comment_date></row><row _id="row-pvug~8i9r.c9iy" _uuid="00000000-0000-0000-050A-D65E70926CA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pvug~8i9r.c9iy"><intent_id>1265332</intent_id><project_id>1030312</project_id><text_data>Job #42329-1 EVSD Sequoia HS</text_data><comment_date>2022-09-09T00:00:00</comment_date></row><row _id="row-9epx.4qdw.6vqx" _uuid="00000000-0000-0000-BDBF-0B1087F9D554" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9epx.4qdw.6vqx"><intent_id>1078783</intent_id><project_id>928387</project_id><text_data>7023343</text_data><comment_date>2020-08-08T00:00:00</comment_date></row><row _id="row-7idj~vequ.hpwa" _uuid="00000000-0000-0000-6D72-09EA9BFCCE0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7idj~vequ.hpwa"><intent_id>622618</intent_id><project_id>732015</project_id><text_data>Job # 918934</text_data><comment_date>2014-03-31T00:00:00</comment_date></row><row _id="row-zxgu.t9mc~f66k" _uuid="00000000-0000-0000-B89B-FDC5A4A983B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxgu.t9mc~f66k"><intent_id>822210</intent_id><project_id>805382</project_id><text_data>Filed by Antonio Mantese</text_data><comment_date>2017-03-22T00:00:00</comment_date></row><row _id="row-fj3u-xpse-34xu" _uuid="00000000-0000-0000-AF7C-82D9D01FD9B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fj3u-xpse-34xu"><intent_id>501367</intent_id><project_id>683135</project_id><text_data>General Laborers will be removing filter screens and filters and washing with a 3&amp;quot; water hose.</text_data><comment_date>2012-02-28T00:00:00</comment_date></row><row _id="row-knqf~2juc_fhca" _uuid="00000000-0000-0000-9757-BE470C17FA0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knqf~2juc_fhca"><intent_id>580575</intent_id><project_id>715265</project_id><text_data>810462000</text_data><comment_date>2013-07-11T00:00:00</comment_date></row><row _id="row-vh4w~s3xj-5c7b" _uuid="00000000-0000-0000-9EE3-001450E39544" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vh4w~s3xj-5c7b"><intent_id>1317666</intent_id><project_id>1062160</project_id><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-pqa3.rvau_cnns" _uuid="00000000-0000-0000-3FA4-77E7AD3E18D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqa3.rvau_cnns"><intent_id>1317538</intent_id><project_id>1023285</project_id><text_data>RCNW job# 2201trucks - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-j3df_jv4j.7xqs" _uuid="00000000-0000-0000-638D-18A4B3B4914C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j3df_jv4j.7xqs"><intent_id>1317675</intent_id><project_id>1007894</project_id><text_data>ICI #1363</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-czch.my8y-d686" _uuid="00000000-0000-0000-0084-8A86FD83C6E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-czch.my8y-d686"><intent_id>1318767</intent_id><project_id>1062822</project_id><text_data>Relocate existing workstation in TC-1 3rd floor for the executive office.elect tech(06)inside work</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-2nuc~3pmb~zdvw" _uuid="00000000-0000-0000-86D1-D03A32A69B0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2nuc~3pmb~zdvw"><intent_id>1388315</intent_id><project_id>1097876</project_id><text_data>1018357</text_data><comment_date>2023-12-15T00:00:00</comment_date></row><row _id="row-5b4v.cmyb.s8m3" _uuid="00000000-0000-0000-A2F5-94376F70E31A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5b4v.cmyb.s8m3"><intent_id>780190</intent_id><project_id>797271</project_id><text_data>1-Insulation, Gutters, Garage Doors, 2-12 duplexes, 24 Units Total, 3-Single &amp; two Story, 4A-No, B-No, C-Yes, D-No, E-No, F-No, G-No, H-No, I-No, J-Yes, K-NA, 5-Yes, 6-Yes, 7-No, 8-Yes</text_data><comment_date>2016-08-05T00:00:00</comment_date></row><row _id="row-bvx3.t979.mbnz" _uuid="00000000-0000-0000-00B8-9D85854B6356" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bvx3.t979.mbnz"><intent_id>514738</intent_id><project_id>688744</project_id><text_data>This information was required last year in order for my intent to be approved.....I'm going to copy what I wrote last year. &amp;quot;We do not have a contractors registration number because we are from Oregon. We have a contractor License number NOT a Registration number. I called the contractor registration office and spoke to Pam Burgman, Superviser, and she told me we do not need a contractor registration number because we do not replace water meters, only repair meters which counts as a service. Total replacement only of water meters would require a registration number. She confirmed this with her superior. Her phone number is 360-902-5202.&amp;quot; Again, this is from last year. I spoke to Pam in June of 2011.</text_data><comment_date>2012-06-01T00:00:00</comment_date></row><row _id="row-6343~tcmq.hjvr" _uuid="00000000-0000-0000-8438-E57D0AFD7E9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6343~tcmq.hjvr"><intent_id>860747</intent_id><project_id>824232</project_id><text_data>Filed by Merrill Burnett</text_data><comment_date>2017-09-05T00:00:00</comment_date></row><row _id="row-bd2b-gxjg.bruu" _uuid="00000000-0000-0000-E14D-C6219E864782" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bd2b-gxjg.bruu"><intent_id>695734</intent_id><project_id>762787</project_id><text_data>Filed by Michael Harrell</text_data><comment_date>2015-05-20T00:00:00</comment_date></row><row _id="row-etce~qyvg~37qm" _uuid="00000000-0000-0000-A0F9-D7187C98A810" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-etce~qyvg~37qm"><intent_id>1275249</intent_id><project_id>1034661</project_id><text_data>We are a sub, Blue1 is the prime contractor. They have a source well contract with the county which allows them to circumvent the requirements to go out for public bids. While this project will lead into a larger project eventually, this description accurately represents the contract as it is now.</text_data><comment_date>2022-11-30T00:00:00</comment_date></row><row _id="row-ftpi-pcbd~atmj" _uuid="00000000-0000-0000-41E2-9B63A7D6E5F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ftpi-pcbd~atmj"><intent_id>1208163</intent_id><project_id>997511</project_id><text_data>JCI Project 2N59-0024 EC Company Electrical Subcontractor.</text_data><comment_date>2022-01-31T00:00:00</comment_date></row><row _id="row-bgbt~dwnr~wyhm" _uuid="00000000-0000-0000-BA33-D9FEB878C30F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bgbt~dwnr~wyhm"><intent_id>655881</intent_id><project_id>718650</project_id><text_data>Clean up laborer using a vacuum and rags</text_data><comment_date>2014-09-20T00:00:00</comment_date></row><row _id="row-syxf-pdyd.dz2d" _uuid="00000000-0000-0000-0B84-F1C1787976D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-syxf-pdyd.dz2d"><intent_id>1257387</intent_id><project_id>1016871</project_id><text_data>Some of the tools that we will be using are brooms, shovels, trowels and wheelbarrows, we will repair the synthetic surface with a urethan binder &amp; rubber. We will also be using other safety equipment to keep the children, workers and public safe. Then we will restripe the lane lines with white paint.</text_data><comment_date>2022-08-11T00:00:00</comment_date></row><row _id="row-4vqe~f6wc.d7kp" _uuid="00000000-0000-0000-A109-EDCBDEC6717F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4vqe~f6wc.d7kp"><intent_id>457444</intent_id><project_id>663730</project_id><text_data>Beautification of area adjacent to roadway and bridge through the installation of trees and shrubs, topsoil, bark mulch, and grass.  Equip: Bobcat, hydroseeder, hand tools.</text_data><comment_date>2011-05-25T00:00:00</comment_date></row><row _id="row-qidq~36v3.we5f" _uuid="00000000-0000-0000-32D2-2E9EBC3D9BC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qidq~36v3.we5f"><intent_id>543844</intent_id><project_id>699431</project_id><text_data>921330</text_data><comment_date>2012-11-09T00:00:00</comment_date></row><row _id="row-ax8n_p9ua.ifb9" _uuid="00000000-0000-0000-BF20-9654B6E16023" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ax8n_p9ua.ifb9"><intent_id>967371</intent_id><project_id>876256</project_id><text_data>#1-Single Zone Ductless, #2-Single , #3-1 , #4-residential a - nob- Noc- Yesd- Noe- Nof-  Nog- Noh - Noi - Noj- Nok- No</text_data><comment_date>2019-03-25T00:00:00</comment_date></row><row _id="row-7mbq~dinv_9m4w" _uuid="00000000-0000-0000-DB24-F5E68C13572B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7mbq~dinv_9m4w"><intent_id>1213224</intent_id><project_id>992226</project_id><text_data>1) Replace existing bath fan; Install bath fan timer; disconnect speaker wiring2)yes3)one4)a-no, b-no, c-yes, d-l-no5)yes6)yes7)no8)no</text_data><comment_date>2022-02-22T00:00:00</comment_date></row><row _id="row-g39w_2qk4_55rf" _uuid="00000000-0000-0000-6C2E-B085106F58CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g39w_2qk4_55rf"><intent_id>875625</intent_id><project_id>837800</project_id><text_data>Wage 32.78; NEBF .98; Edison Pension 4.80; District 9 1.45; Health &amp; Welfare 9.80; flex 1.20; Appr Training .75; BLMCC .20</text_data><comment_date>2017-11-17T00:00:00</comment_date></row><row _id="row-kd2p~6isg~9bkd" _uuid="00000000-0000-0000-FC8B-B7813F50E03A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kd2p~6isg~9bkd"><intent_id>1037767</intent_id><project_id>906329</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a - no; 4b - no; 4c - yes; 4d - no; 4e - no; 4f - no; 4g - no; 4h - no; 4i - no; 4j - no; 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2020-02-12T00:00:00</comment_date></row><row _id="row-t4a2-4tv8-zcjh" _uuid="00000000-0000-0000-77BC-D68F406AA283" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t4a2-4tv8-zcjh"><intent_id>1268569</intent_id><project_id>1032109</project_id><text_data>breakdown#1    9.41 pension 6.14 medical. 2.91 Vacation 2.29 holidaybreakdown#2  11.17 pension. 2.74 medical. 2.96 Vacation 2.34 holiday</text_data><comment_date>2022-09-21T00:00:00</comment_date></row><row _id="row-e6x7~2n3s~hq94" _uuid="00000000-0000-0000-6FEB-4FDAD9EA36F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e6x7~2n3s~hq94"><intent_id>845043</intent_id><project_id>826176</project_id><text_data>INSTALLING 400HP PUMP IN AN EXISTING WELL. EQUIPMENT USED IS AS FOLLOWS: CRANE, ELEVATORS, CHAIN WRENCHES, PIPE WRENCHES, SLIP PLATES, EYE BEAMS.</text_data><comment_date>2017-07-04T00:00:00</comment_date></row><row _id="row-pdw2.8bg3_asm9" _uuid="00000000-0000-0000-44CD-4A299FC13D32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pdw2.8bg3_asm9"><intent_id>668521</intent_id><project_id>704671</project_id><text_data>Project #2113006</text_data><comment_date>2014-12-04T00:00:00</comment_date></row><row _id="row-y67e.tv79.3nia" _uuid="00000000-0000-0000-0D16-7B4249B536FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y67e.tv79.3nia"><intent_id>1214597</intent_id><project_id>1001459</project_id><text_data>install cabling for new workstation drops. Vape Sensor DropsWAP(Wireless access points)inside workElect tech(06)</text_data><comment_date>2022-03-01T00:00:00</comment_date></row><row _id="row-s56t-62vv_26yy" _uuid="00000000-0000-0000-B232-C9731F082247" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s56t-62vv_26yy"><intent_id>846850</intent_id><project_id>822059</project_id><text_data>HIRED BY SUB MORENO &amp; NELSON</text_data><comment_date>2017-07-12T00:00:00</comment_date></row><row _id="row-8i9s-2ik9~drqc" _uuid="00000000-0000-0000-E118-9BE88B657570" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8i9s-2ik9~drqc"><intent_id>458592</intent_id><project_id>666376</project_id><text_data>dump truck and trailer  is a  Kenworth T-800  7 axle   4 on tractor and 3 on trailer   end dump</text_data><comment_date>2011-06-02T00:00:00</comment_date></row><row _id="row-jf2v_2i45_jvck" _uuid="00000000-0000-0000-988D-DD8CAEA9C2B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jf2v_2i45_jvck"><intent_id>553955</intent_id><project_id>703870</project_id><text_data>Scope of work: Installation of 5 feet wide culvert to surround water valve and be flush with ground level to include removal of soil by hand with shovels, digging bars, buckets, wheelbarrows and hauled off site with Ford F550 truck, single axled dual wheeled.</text_data><comment_date>2013-01-29T00:00:00</comment_date></row><row _id="row-9keb~ixzp~vtht" _uuid="00000000-0000-0000-AD54-8E3521F78B54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9keb~ixzp~vtht"><intent_id>1223215</intent_id><project_id>1006982</project_id><text_data>WO 30001441</text_data><comment_date>2022-04-05T00:00:00</comment_date></row><row _id="row-bc32~7bwq_az46" _uuid="00000000-0000-0000-8B78-FF1FDB10ABB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bc32~7bwq_az46"><intent_id>541742</intent_id><project_id>695766</project_id><text_data>Form filed by: Thomas W Mundt</text_data><comment_date>2012-10-25T00:00:00</comment_date></row><row _id="row-88fg.mems-jvc6" _uuid="00000000-0000-0000-E0C6-A3E831DF8D8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-88fg.mems-jvc6"><intent_id>616714</intent_id><project_id>729310</project_id><text_data>Decontaminate ducting fanHazWaste Workers to decontaminate fan using rags, sponges and/or small hand tools</text_data><comment_date>2014-02-18T00:00:00</comment_date></row><row _id="row-unvt.yubh_b7tj" _uuid="00000000-0000-0000-D09C-4326822607FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-unvt.yubh_b7tj"><intent_id>998412</intent_id><project_id>889817</project_id><text_data>Power Equipment operator is to be done by owner Chad Peterson, raking, shoveling ect will be done by employees ( landscape laborers).</text_data><comment_date>2019-11-12T00:00:00</comment_date></row><row _id="row-qhu5_rsrt-28x2" _uuid="00000000-0000-0000-ADC5-CBBC296C3EFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qhu5_rsrt-28x2"><intent_id>1500388</intent_id><project_id>1164776</project_id><text_data>#1 � The crew will be installing a heat pump#2 - Singe-Family #3 � 2-Stories or Less #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2025-01-09T00:00:00</comment_date></row><row _id="row-vyc3_utq2_jgik" _uuid="00000000-0000-0000-D8B8-AFEF37DDF3F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vyc3_utq2_jgik"><intent_id>1508705</intent_id><project_id>1169903</project_id><text_data>H25-015</text_data><comment_date>2025-02-11T00:00:00</comment_date></row><row _id="row-hyfs_ugzg_49ua" _uuid="00000000-0000-0000-E4C3-8CEEB136A44C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hyfs_ugzg_49ua"><intent_id>1508798</intent_id><project_id>1169970</project_id><text_data>2025-0402</text_data><comment_date>2025-02-11T00:00:00</comment_date></row><row _id="row-atux_tr46.v7qm" _uuid="00000000-0000-0000-7A4F-0CEF969465D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-atux_tr46.v7qm"><intent_id>1518240</intent_id><project_id>1175676</project_id><text_data>#1 Replace bath fan. #2 Single family dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2025-03-16T00:00:00</comment_date></row><row _id="row-gfg3~bcj9_2uyv" _uuid="00000000-0000-0000-9273-185A9CE70C13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfg3~bcj9_2uyv"><intent_id>1133309</intent_id><project_id>956770</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2021-04-08T00:00:00</comment_date></row><row _id="row-59ds_svhh.jrzt" _uuid="00000000-0000-0000-358B-22972F4E98BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-59ds_svhh.jrzt"><intent_id>875575</intent_id><project_id>837778</project_id><text_data>Blairco Project Number 17-7516</text_data><comment_date>2017-11-17T00:00:00</comment_date></row><row _id="row-sqiv~75va~585q" _uuid="00000000-0000-0000-0052-30421DDE1327" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqiv~75va~585q"><intent_id>810310</intent_id><project_id>770487</project_id><text_data>Filed by Jacquie HilfikerThis project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2017-01-09T00:00:00</comment_date></row><row _id="row-gs42_3r2x.jjmf" _uuid="00000000-0000-0000-D780-A8AD01A68772" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gs42_3r2x.jjmf"><intent_id>984334</intent_id><project_id>884088</project_id><text_data>022B16579</text_data><comment_date>2019-06-12T00:00:00</comment_date></row><row _id="row-njnj.283k-sj6q" _uuid="00000000-0000-0000-F275-A22EEB28DCE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-njnj.283k-sj6q"><intent_id>861661</intent_id><project_id>819863</project_id><text_data>Providing the beautification of an area adjacent to the roadside using a CAD Slinger Truck which utilizes a conveyor. Also, using a blower/mulch truck to blow in beauty bark.</text_data><comment_date>2017-09-08T00:00:00</comment_date></row><row _id="row-cjxu.dgrt~t7v2" _uuid="00000000-0000-0000-F6DC-9BE1162A4FAF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjxu.dgrt~t7v2"><intent_id>642244</intent_id><project_id>681318</project_id><text_data>PENSION - 5.50/HRHEALTH/WELFARE - 7.41/HRAPPRENTICESHIP - .71/HRSUBSTANCE ABUSE PROGRAM - .06/HRSTEP 1 APPRENTICE DOES NOT HAVE PENSION</text_data><comment_date>2014-07-21T00:00:00</comment_date></row><row _id="row-78qw_w4r6-gkp3" _uuid="00000000-0000-0000-B475-5ED4F373E051" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-78qw_w4r6-gkp3"><intent_id>1049779</intent_id><project_id>914832</project_id><text_data>.</text_data><comment_date>2020-04-09T00:00:00</comment_date></row><row _id="row-h28t-upb4.8ttb" _uuid="00000000-0000-0000-38C9-080BA7DD3109" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h28t-upb4.8ttb"><intent_id>545195</intent_id><project_id>699967</project_id><text_data>sr23894104</text_data><comment_date>2012-11-19T00:00:00</comment_date></row><row _id="row-h5qu.fvra~g28t" _uuid="00000000-0000-0000-B950-2199B5C8A122" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h5qu.fvra~g28t"><intent_id>727853</intent_id><project_id>773169</project_id><text_data>Russell Landscaping is responsible for installing a fully automatic sprinkler system.</text_data><comment_date>2015-10-22T00:00:00</comment_date></row><row _id="row-kypn-6wyn-ppky" _uuid="00000000-0000-0000-F966-01815F76F6D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kypn-6wyn-ppky"><intent_id>813170</intent_id><project_id>800578</project_id><text_data>ROGNLINS HIRED US.</text_data><comment_date>2017-01-27T00:00:00</comment_date></row><row _id="row-uy9q_8fjx.c2fp" _uuid="00000000-0000-0000-50E2-41E980E81EC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uy9q_8fjx.c2fp"><intent_id>596401</intent_id><project_id>689973</project_id><text_data>conveyor truck is 12ft by 30ft and hold up to 15 yards of soil at a time.</text_data><comment_date>2013-09-27T00:00:00</comment_date></row><row _id="row-vrch.g3xv_bdt6" _uuid="00000000-0000-0000-052A-E322ABC87FAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vrch.g3xv_bdt6"><intent_id>1150214</intent_id><project_id>965405</project_id><text_data>Low income single family residence insulation/weatherization upgrade</text_data><comment_date>2021-06-07T00:00:00</comment_date></row><row _id="row-3rqd-sxbu.n2vp" _uuid="00000000-0000-0000-BBA8-603DB44BC60E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3rqd-sxbu.n2vp"><intent_id>851229</intent_id><project_id>817530</project_id><text_data>HIRED BY SUB ANDERSEN STRUCTURES</text_data><comment_date>2017-07-31T00:00:00</comment_date></row><row _id="row-xas4.bcym~b49v" _uuid="00000000-0000-0000-7339-F4B707BE42C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xas4.bcym~b49v"><intent_id>1104565</intent_id><project_id>940588</project_id><text_data>invoice #125902 drain cleaning and plumbing</text_data><comment_date>2020-11-19T00:00:00</comment_date></row><row _id="row-c5ws.xbqg-prxa" _uuid="00000000-0000-0000-F438-13398E000DFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c5ws.xbqg-prxa"><intent_id>928905</intent_id><project_id>853173</project_id><text_data>Filed by Casey Walker</text_data><comment_date>2018-08-28T00:00:00</comment_date></row><row _id="row-9p8c~m9hr.4bbm" _uuid="00000000-0000-0000-F4D1-DFC8219F90E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9p8c~m9hr.4bbm"><intent_id>817933</intent_id><project_id>791245</project_id><text_data>Signed by Mitch Herdt Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirementsProject Site Addresses:EB Wilson Building-1202 South M Street, Tacoma WA 98405 Davis �Bacon (Commercial) Rates                Apply WA150038 3/27/15Fawcett Apartments-3201 Fawcett Ave, Tacoma WA 98418 Davis- Bacon Residential Rates Apply WA150118 3/27/15Wright Street Apartments- 602 South Wright Street, Tacoma WA 98418 Davis-Bacon Residential Rates Apply WA150118 3/27/15K Street Apartments- 911 North K Street, Tacoma WA 98403 Davis-Bacon Residential Rates Apply WA150118 3/27/15Ludwig Apartments-5425 South Lawrence Street, Tacoma WA 98409 Davis-Bacon Residential Rates Apply WA150118 3/27/15G Street Apartments- 401 North G Street Tacoma WA 98225 Davis-Bacon Residential Rates Apply WA150118 3/27/156th Avenue Apartments- 2302 6th Avenue, Tacoma WA 98225 Davis-Bacon Residential Rates Apply WA150118 3/27/15Bergerson Terrace Apartments- 5301 South Orchard, Tacoma WA 98229 Davis-Bacon Residential Rates Apply WA150118 3/27/15Dixon Village- 5401 South Stevens, Tacoma WA 98409 Davis-Bacon Residential Rates Apply WA150118 3/27/15</text_data><comment_date>2017-02-27T00:00:00</comment_date></row><row _id="row-9vh2.z7dm-wpfe" _uuid="00000000-0000-0000-C9D1-8875E7959BE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9vh2.z7dm-wpfe"><intent_id>814811</intent_id><project_id>812928</project_id><text_data>Propane leak</text_data><comment_date>2017-02-07T00:00:00</comment_date></row><row _id="row-cjtk.pf7f~tts2" _uuid="00000000-0000-0000-739F-6B1EB30DA893" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjtk.pf7f~tts2"><intent_id>1084045</intent_id><project_id>861540</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and 2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2020-08-28T00:00:00</comment_date></row><row _id="row-ru3u~hzd4.v7n9" _uuid="00000000-0000-0000-D3FD-34D579AD255A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ru3u~hzd4.v7n9"><intent_id>680025</intent_id><project_id>724146</project_id><text_data>bp99</text_data><comment_date>2015-02-19T00:00:00</comment_date></row><row _id="row-ry8b.g63r~uc6g" _uuid="00000000-0000-0000-CFB0-6476031C3D15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ry8b.g63r~uc6g"><intent_id>1206050</intent_id><project_id>914313</project_id><text_data>Oldcastle Infrastructure believes that the work and hours described in this intent to pay prevailing wage and/or affidavit of wages paid is not subject to payment of prevailing wage. Oldcastle precast's filing of an intent to pay prevailing wage and/or affidavit of wages paid may not be construed in any manner whatsoever as an acknowledgement or agreement that the work and hours described therein are subject to payment of prevailing wage.</text_data><comment_date>2022-01-20T00:00:00</comment_date></row><row _id="row-c6jx-stw6_giwv" _uuid="00000000-0000-0000-9AF6-5A47F972E838" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6jx-stw6_giwv"><intent_id>1465718</intent_id><project_id>1144625</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. General contract with CAC, windows, doors, insulation, checking ducts for holes and taping holes up/ insulation of ducts, floor repairs and ect.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have? Single story #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house?NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Assisted living services? NO (I) Dormitories? NO (j) Counseling? NO (k) Is each room and/or bed in the structure rented separately? NO (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? N/A #6 - Does each dwelling unit have its own bathroom? N/A #7 - Is there a community facility or manager�s office on site? N/A #8 - Is any part of the structure used by members of the public?NO</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-qxcw~wrj6~3p2c" _uuid="00000000-0000-0000-79D8-1E35DE56BEBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qxcw~wrj6~3p2c"><intent_id>1518273</intent_id><project_id>1175694</project_id><text_data>126323-001</text_data><comment_date>2025-03-16T00:00:00</comment_date></row><row _id="row-hkge~dhmz-qztb" _uuid="00000000-0000-0000-089F-1B9A6EE392BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hkge~dhmz-qztb"><intent_id>541959</intent_id><project_id>688707</project_id><text_data>Sent email:  On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2012-11-13T00:00:00</comment_date></row><row _id="row-6yfr-z7me_2nww" _uuid="00000000-0000-0000-968C-0363DEB3D8FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6yfr-z7me_2nww"><intent_id>1235188</intent_id><project_id>1014175</project_id><text_data>Pick up truck with high presser water jetter</text_data><comment_date>2022-05-20T00:00:00</comment_date></row><row _id="row-3gah-5san~kr58" _uuid="00000000-0000-0000-88FF-125D8D8F49D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gah-5san~kr58"><intent_id>943271</intent_id><project_id>858743</project_id><text_data>WE lay extruded concrete landscape borders</text_data><comment_date>2018-11-01T00:00:00</comment_date></row><row _id="row-88z5-hw74.4w8f" _uuid="00000000-0000-0000-9323-1D4A96A9CAA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-88z5-hw74.4w8f"><intent_id>541482</intent_id><project_id>697561</project_id><text_data>Bell 18 Bowline Ct 98229</text_data><comment_date>2012-10-24T00:00:00</comment_date></row><row _id="row-a7u4~7ubx-uupw" _uuid="00000000-0000-0000-37C3-1D2D8BD5B6DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7u4~7ubx-uupw"><intent_id>1266167</intent_id><project_id>1029943</project_id><text_data>Truck driver is driving a flatbed truck and pulling trailer</text_data><comment_date>2022-09-14T00:00:00</comment_date></row><row _id="row-wwkv~pgxh.ztgb" _uuid="00000000-0000-0000-14C0-11D1F2EF58A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wwkv~pgxh.ztgb"><intent_id>526339</intent_id><project_id>693070</project_id><text_data>1)YES, 2)VARIES 1-2, 3)A YES, B-G NO) 4)YES, 5)YES, 6)NO, 7)NO</text_data><comment_date>2012-08-03T00:00:00</comment_date></row><row _id="row-84rf-7s2q-y5xy" _uuid="00000000-0000-0000-27A0-8BB0C7B2F61F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-84rf-7s2q-y5xy"><intent_id>868622</intent_id><project_id>834949</project_id><text_data>Prepare area to install turf block. Add 2&amp;quot; sand and grade. Retrofit irrigation system within 6 inch depth to accommodate new grass. Install turf block, add soil to .5&amp;quot; below surface of block and grass seed. Remove debris off site.</text_data><comment_date>2017-10-12T00:00:00</comment_date></row><row _id="row-zfh7-t5zv.ybjv" _uuid="00000000-0000-0000-3CB9-BF523DAC3EB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zfh7-t5zv.ybjv"><intent_id>501686</intent_id><project_id>679444</project_id><text_data>062001</text_data><comment_date>2012-02-24T00:00:00</comment_date></row><row _id="row-zv5e.mhb3.4v56" _uuid="00000000-0000-0000-F16A-B56349513072" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zv5e.mhb3.4v56"><intent_id>515906</intent_id><project_id>566858</project_id><text_data>Synthetic Sports Surfacinfg  over asphalt.</text_data><comment_date>2012-06-08T00:00:00</comment_date></row><row _id="row-xdv6.483i~ehy7" _uuid="00000000-0000-0000-621A-B9D4099223DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdv6.483i~ehy7"><intent_id>852722</intent_id><project_id>817305</project_id><text_data>union contractor7.52 medical17.00 pensions.94 apprentice training</text_data><comment_date>2017-08-04T00:00:00</comment_date></row><row _id="row-jhej_e85f.qnf9" _uuid="00000000-0000-0000-1CA7-861176CA641E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jhej_e85f.qnf9"><intent_id>1179194</intent_id><project_id>980178</project_id><text_data>WRI Job# 21.039</text_data><comment_date>2021-09-21T00:00:00</comment_date></row><row _id="row-d4p6-atxj~ggpf" _uuid="00000000-0000-0000-ECF5-D6F358453382" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4p6-atxj~ggpf"><intent_id>675135</intent_id><project_id>753869</project_id><text_data>Job # 101157-001</text_data><comment_date>2015-01-16T00:00:00</comment_date></row><row _id="row-n8we~243i~7sws" _uuid="00000000-0000-0000-FA83-56A216A73EC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n8we~243i~7sws"><intent_id>595063</intent_id><project_id>705334</project_id><text_data>Filed by Signa M. Wagner.</text_data><comment_date>2013-09-20T00:00:00</comment_date></row><row _id="row-62gg.u8y8-ezn3" _uuid="00000000-0000-0000-29C8-9355F4054067" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-62gg.u8y8-ezn3"><intent_id>1010388</intent_id><project_id>894539</project_id><text_data>PROVIDE AND INSTALL NEW WIFI CABLING AT FIRSTENBURG CENTER AND UTILITIES BLDG</text_data><comment_date>2019-09-26T00:00:00</comment_date></row><row _id="row-ixpz.x5mi.rmaq" _uuid="00000000-0000-0000-0E8F-53BEE023BF95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ixpz.x5mi.rmaq"><intent_id>962779</intent_id><project_id>869483</project_id><text_data>Tymco 600 on international or freightliner chassis</text_data><comment_date>2019-02-28T00:00:00</comment_date></row><row _id="row-fqpx~n5ab-6v87" _uuid="00000000-0000-0000-2ED1-DE1DEDD9F8BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fqpx~n5ab-6v87"><intent_id>476293</intent_id><project_id>673794</project_id><text_data>The entire project was the building/construction of a fire station (new construction). Archterra installed topsoil to flower beds and lawn areas of fire station landscape. soil depth was approximently 4&amp;quot; thick on top of subgrade preformed by others. We used bobcat skidsteer loader and hand labor to install soil. Soil was onsite by others prior to our start. Hand tools used were rakes, shovels, and hand roller. Upon soil installation completion, we installed sod for lawn areas, and trees and small bushes for planter areas. There were (12) 6-8' trees and (50) 5 gal plants. No mulch was installed.</text_data><comment_date>2011-09-27T00:00:00</comment_date></row><row _id="row-8ixy.yuui~qc3p" _uuid="00000000-0000-0000-C5C6-7EFA2049D95D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ixy.yuui~qc3p"><intent_id>1275189</intent_id><project_id>1035668</project_id><text_data>LONG job number 5020.220480</text_data><comment_date>2022-10-17T00:00:00</comment_date></row><row _id="row-st8t_aq63.85f9" _uuid="00000000-0000-0000-6972-C46E86E5F6B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-st8t_aq63.85f9"><intent_id>913314</intent_id><project_id>847055</project_id><text_data>370 Reynolds Road #58Othello, WA 99344</text_data><comment_date>2018-06-22T00:00:00</comment_date></row><row _id="row-58z4_kvj6_5e3x" _uuid="00000000-0000-0000-4AD6-FC544D000814" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-58z4_kvj6_5e3x"><intent_id>664494</intent_id><project_id>744778</project_id><text_data>TOTAL FRINGE IS SENT TO A QUALIFIED PENSION PLAN.  PLAN IS 100% IMMEDIATELY VESTED AND PAID MONTHLY.</text_data><comment_date>2014-11-06T00:00:00</comment_date></row><row _id="row-9v5p~xh3d.62x5" _uuid="00000000-0000-0000-DE8B-C71C7A042B89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9v5p~xh3d.62x5"><intent_id>1282596</intent_id><project_id>1040295</project_id><text_data>We performed emergency services and water mitigation. There is one unit affected total. The unit number is 105. Cabinets were removed, drywall was removed, insulation removed, and drying EQ was set. That drying equipment consists of air movers (axial and centrifugal) dehumidifiers (low grain refrigerant), we used shop vacs, brooms, dust pans, and rags, we used hand tools for demo such as a hammers, prybars and a kettsaw. After demolition we set up the drying equipment and monitored using a moisture meter. A work van was used to transport employees and equipment to job site.  Another Contractor,  is handling repairs of the unit.</text_data><comment_date>2022-12-08T00:00:00</comment_date></row><row _id="row-44hp-9q8n-udzx" _uuid="00000000-0000-0000-9241-CF3706BDE4BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-44hp-9q8n-udzx"><intent_id>505125</intent_id><project_id>601805</project_id><text_data>Form filed by: Sue Heidemann - murq235</text_data><comment_date>2012-03-23T00:00:00</comment_date></row><row _id="row-j96k~qywi-q2a5" _uuid="00000000-0000-0000-8B77-9F1C43191092" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j96k~qywi-q2a5"><intent_id>812795</intent_id><project_id>812003</project_id><text_data>1)We were contracted to repair water heater 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-01-25T00:00:00</comment_date></row><row _id="row-6iph_3g6t-h8ja" _uuid="00000000-0000-0000-BF6D-4E8E6C78F4FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6iph_3g6t-h8ja"><intent_id>1387023</intent_id><project_id>1098653</project_id><comment_date>2023-12-11T00:00:00</comment_date></row><row _id="row-pk4m-8jw9_3jjr" _uuid="00000000-0000-0000-6AFD-53ACBD6209B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pk4m-8jw9_3jjr"><intent_id>934518</intent_id><project_id>862076</project_id><text_data>WO #8042021</text_data><comment_date>2018-09-21T00:00:00</comment_date></row><row _id="row-i9i2.hd3b-g77e" _uuid="00000000-0000-0000-0A10-AC742FF1AB54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9i2.hd3b-g77e"><intent_id>1026007</intent_id><project_id>901577</project_id><text_data>1, windows and landscaping 2,single 3,3 4 a,no, b no c, yes d, no e no f, no g no h, no, i, no j, no k, no ino 5,no 6, no 7,no 8, no no</text_data><comment_date>2019-12-10T00:00:00</comment_date></row><row _id="row-gckw-xhsb~ai2j" _uuid="00000000-0000-0000-9900-4A10A0E1784D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gckw-xhsb~ai2j"><intent_id>980270</intent_id><project_id>882186</project_id><text_data>Quote #2 for Kittitas County Sheriff</text_data><comment_date>2019-05-24T00:00:00</comment_date></row><row _id="row-prfi~bbx9.fvcw" _uuid="00000000-0000-0000-E963-510D96367100" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prfi~bbx9.fvcw"><intent_id>1070176</intent_id><project_id>924510</project_id><text_data>Centennial project no. 73880-0037</text_data><comment_date>2020-07-06T00:00:00</comment_date></row><row _id="row-aypu_idkc.zmt9" _uuid="00000000-0000-0000-2B70-1F84A580A81E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aypu_idkc.zmt9"><intent_id>708566</intent_id><project_id>763865</project_id><text_data>Form filed by:  Landon Becker</text_data><comment_date>2015-07-20T00:00:00</comment_date></row><row _id="row-8kzu.c584.ryiv" _uuid="00000000-0000-0000-19EB-683C2BB396E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8kzu.c584.ryiv"><intent_id>1113268</intent_id><project_id>880253</project_id><text_data>RON RHOADS IS AN OWNER/OPERATOR</text_data><comment_date>2021-01-05T00:00:00</comment_date></row><row _id="row-74um-tfqh-d34u" _uuid="00000000-0000-0000-1F32-9A93A371EA5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74um-tfqh-d34u"><intent_id>1015436</intent_id><project_id>886357</project_id><text_data>Wildlands will be seeding, fertilizing and mulching to a depth of 1 inch.</text_data><comment_date>2019-10-16T00:00:00</comment_date></row><row _id="row-fisy_beav_mxcr" _uuid="00000000-0000-0000-FFEA-B853339FCDDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fisy_beav_mxcr"><intent_id>1070467</intent_id><project_id>924622</project_id><text_data>All work is hand work</text_data><comment_date>2020-07-07T00:00:00</comment_date></row><row _id="row-dskb-zpvx-n57y" _uuid="00000000-0000-0000-4EC8-B09F5ED590D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dskb-zpvx-n57y"><intent_id>1272549</intent_id><project_id>1012687</project_id><text_data>we will be installing willow's</text_data><comment_date>2022-10-06T00:00:00</comment_date></row><row _id="row-3vv2~zs2k~9cdg" _uuid="00000000-0000-0000-D599-187A1704E6B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vv2~zs2k~9cdg"><intent_id>561969</intent_id><project_id>707644</project_id><text_data>Other Trucks-Lowboy</text_data><comment_date>2013-03-28T00:00:00</comment_date></row><row _id="row-q233_xhef-rsb3" _uuid="00000000-0000-0000-9BA0-F150C39DE875" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q233_xhef-rsb3"><intent_id>920676</intent_id><project_id>856862</project_id><text_data>This project consists of: 1. Clearing and grubbing 2. Installation of french drains less than 3&amp;#39; deep 3. Installation of rock retaining walls less than 4&amp;#39; 4. Installation of rock retaining walls greater than 4&amp;#39; 5. Installation of Dirt trail 6. Installation of Asphalt trail 7. Modification of existing chainlink fence 8. landscape plantings.</text_data><comment_date>2018-07-25T00:00:00</comment_date></row><row _id="row-4v2p_rvue-irbx" _uuid="00000000-0000-0000-45C0-AC5229BD0E30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4v2p_rvue-irbx"><intent_id>512375</intent_id><project_id>684534</project_id><text_data>2802 beaudry rd #58yakima,wa 98901</text_data><comment_date>2012-05-17T00:00:00</comment_date></row><row _id="row-yfjw_7hdx~trys" _uuid="00000000-0000-0000-E73E-C3D47A1EE3F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yfjw_7hdx~trys"><intent_id>648306</intent_id><project_id>733063</project_id><text_data>A) Please describe the whole project � not just your part. I�m not positive about what the entire project is.  I just know what we, (Hanson Welding &amp; Fabrication, Inc.) are doing.B) Please describe your part(s) of the project. Performing maintenance and fabricating parts for mobile drilling rigs.C) Please specifically describe the duties being performed by the Power Equipment Operators/Welder and any tools, equipment, or vehicles used.Performing maintenance and fabricating parts for mobile drilling rigs.  Tools being used: welding machines, grinders and torches.  The vehicles we are using are welder mechanic trucks.</text_data><comment_date>2014-08-18T00:00:00</comment_date></row><row _id="row-xp4k_zz6h_6yvi" _uuid="00000000-0000-0000-EBF2-93365EB9F6EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xp4k_zz6h_6yvi"><intent_id>1103736</intent_id><project_id>924873</project_id><text_data>Kenworth tractor trailer with a container used for picking up material and bringing it back to jobsite for sorting and recycling</text_data><comment_date>2020-11-25T00:00:00</comment_date></row><row _id="row-y7vf~cz4f~dye5" _uuid="00000000-0000-0000-6169-CC784A30BE40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y7vf~cz4f~dye5"><intent_id>732385</intent_id><project_id>767841</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2015-11-19T00:00:00</comment_date></row><row _id="row-5e92.vdqh-ygdk" _uuid="00000000-0000-0000-45AC-3AD66351CEFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5e92.vdqh-ygdk"><intent_id>1156484</intent_id><project_id>943459</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2021-06-29T00:00:00</comment_date></row><row _id="row-7fxy-6gdn_hwek" _uuid="00000000-0000-0000-E722-5C27CB473C1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7fxy-6gdn_hwek"><intent_id>1245794</intent_id><project_id>1020183</project_id><text_data>Tribal Self Insured</text_data><comment_date>2022-08-05T00:00:00</comment_date></row><row _id="row-2pad-94kv-w7qj" _uuid="00000000-0000-0000-6944-A462C7D18B67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2pad-94kv-w7qj"><intent_id>871375</intent_id><project_id>836022</project_id><text_data>Workers Compensation: Idaho State Insurance Fund Policy 568189</text_data><comment_date>2017-10-26T00:00:00</comment_date></row><row _id="row-ei9q-sefr-dbi3" _uuid="00000000-0000-0000-61ED-05C576F380F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ei9q-sefr-dbi3"><intent_id>760738</intent_id><project_id>777766</project_id><text_data>Filed by Marianne Redinger</text_data><comment_date>2016-05-06T00:00:00</comment_date></row><row _id="row-fhg7~i93u-x89y" _uuid="00000000-0000-0000-1C37-147DE52A480F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fhg7~i93u-x89y"><intent_id>482177</intent_id><project_id>675821</project_id><text_data>Mountain View Apts is a residential apartment complex that has 36 units. Each unit has a kitchen and a bathroom and is considered a permanent primary residence for all its tenants. The building is no more than three stories in height. The electricians will be replacing lamps and the plumbers will be replacing kitchen and bathroom aerators. This job meets the residential job requirements.</text_data><comment_date>2011-10-06T00:00:00</comment_date></row><row _id="row-a6tb-9m6q-5uha" _uuid="00000000-0000-0000-8BE0-C091157EA926" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a6tb-9m6q-5uha"><intent_id>950063</intent_id><project_id>868357</project_id><text_data>$6.24 Fringe:  Enrolled employees for Medical/Health Program</text_data><comment_date>2018-12-11T00:00:00</comment_date></row><row _id="row-nhf2_f6wq.gj9e" _uuid="00000000-0000-0000-7E7F-E625699994E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nhf2_f6wq.gj9e"><intent_id>818083</intent_id><project_id>806741</project_id><text_data>5.06 MED  11.63 401K</text_data><comment_date>2017-02-27T00:00:00</comment_date></row><row _id="row-cjz6_t9gs_3a6w" _uuid="00000000-0000-0000-8ABB-205A398613BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjz6_t9gs_3a6w"><intent_id>912795</intent_id><project_id>853980</project_id><text_data>Oversaw the work of subcontractor.  Managed the installation of the subcontractor.  Communication with the customer.  Removed existing wireless access points.  Mounted wireless access points to cable runs pulled in and terminated by subcontractor.</text_data><comment_date>2018-06-20T00:00:00</comment_date></row><row _id="row-a9gz~p96x~ynzi" _uuid="00000000-0000-0000-1FC1-B77A5C459776" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a9gz~p96x~ynzi"><intent_id>920783</intent_id><project_id>856894</project_id><text_data>Purchasing performed prior to expected project start date by Project Manager (not subject to prevailing wage)</text_data><comment_date>2018-07-25T00:00:00</comment_date></row><row _id="row-gvva.m5kv.jwua" _uuid="00000000-0000-0000-7DAF-16E5C71C86EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gvva.m5kv.jwua"><intent_id>1026193</intent_id><project_id>901673</project_id><text_data>9839752</text_data><comment_date>2019-12-11T00:00:00</comment_date></row><row _id="row-gqbi.4njg-bmn8" _uuid="00000000-0000-0000-1055-203E422D9935" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqbi.4njg-bmn8"><intent_id>827280</intent_id><project_id>818409</project_id><text_data>1. Underfloor insulation 2. multi-family apartment buildings 3. 2 4. a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)each apartment rented separately i)no 5. yes 6. yes 7. yes 8. no</text_data><comment_date>2017-04-18T00:00:00</comment_date></row><row _id="row-tzvu_rnjc.gmra" _uuid="00000000-0000-0000-7069-978101B2ACBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzvu_rnjc.gmra"><intent_id>1229948</intent_id><project_id>1011053</project_id><text_data>Workers Comp provided by a reciprocating state policy</text_data><comment_date>2022-04-29T00:00:00</comment_date></row><row _id="row-5k9g_vk77.c9cq" _uuid="00000000-0000-0000-324D-21EE321377B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5k9g_vk77.c9cq"><intent_id>484111</intent_id><project_id>676409</project_id><text_data>Fringe Breakdown:  Vacation 1.41 Holiday .62 Health/Life 1.92 Training .60 Pension 17.74</text_data><comment_date>2011-10-17T00:00:00</comment_date></row><row _id="row-qg4z-6nkw-uucf" _uuid="00000000-0000-0000-519B-9E7E4B0DF385" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qg4z-6nkw-uucf"><intent_id>1290694</intent_id><project_id>1027975</project_id><text_data>9908895</text_data><comment_date>2022-12-18T00:00:00</comment_date></row><row _id="row-pbn3.dn8t_jb2i" _uuid="00000000-0000-0000-28A6-89C42F4E5850" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbn3.dn8t_jb2i"><intent_id>449149</intent_id><project_id>619772</project_id><text_data>I understand this project to be constructing, complete, a low income housing project with a multitude of crafts involved.  Our portion is to install a playgound structure. Before the assembly of the structure we will have to dig holes for the posts using shovels, digging bars and wheelbarrows.  That portion of the work will be done by the same two employees, a son and a nephew of mine.  I will be paying a minimum of $25 per hour.  I keep track of the hours they spend doing each project only because of the premiums I have to pay and the hourly deduction from their pay check.  Their rate of pay depending will not change if they perform either of the work categories selected here.This is the first time I have shown the two categories because following a discussion with Jan Bently early this year when I got notice of the new primium rates she gave me permission to accurately report the hours in the seperate classifications because digging of holes for playground posts as compared to one for planting small trees are the same and using the same tools. The change has come about because the rates vary from $1.18 to $1.86 per hour. Please call if you should have any further questions.  Thank you, Glen R. Prosser</text_data><comment_date>2011-04-11T00:00:00</comment_date></row><row _id="row-qmpq_wbvv~hhd3" _uuid="00000000-0000-0000-9AEF-8E061C2B8FAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qmpq_wbvv~hhd3"><intent_id>1099712</intent_id><project_id>938124</project_id><comment_date>2020-10-29T00:00:00</comment_date></row><row _id="row-ibe8-zds7.kgi2" _uuid="00000000-0000-0000-313B-083BB9F1B7CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ibe8-zds7.kgi2"><intent_id>995554</intent_id><project_id>860697</project_id><text_data>New Intent for 904235; Northwest Construction; Contract# 113572 - Addition</text_data><comment_date>2019-07-30T00:00:00</comment_date></row><row _id="row-5vac_zu57-uvw8" _uuid="00000000-0000-0000-0A42-8910D72E2165" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vac_zu57-uvw8"><intent_id>607660</intent_id><project_id>725240</project_id><text_data>Form filed by: Tyson O'Neill</text_data><comment_date>2013-12-09T00:00:00</comment_date></row><row _id="row-m5b6.u67r~a2wc" _uuid="00000000-0000-0000-14E2-7AB7FEAC9B36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m5b6.u67r~a2wc"><intent_id>989339</intent_id><project_id>845075</project_id><text_data>Filed by George Adams</text_data><comment_date>2019-07-02T00:00:00</comment_date></row><row _id="row-czyt-ea8x_mnur" _uuid="00000000-0000-0000-5505-43D3D049F7EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-czyt-ea8x_mnur"><intent_id>1192038</intent_id><project_id>987334</project_id><text_data>1 - Repair broken pipes. 2- Apartments. 3- 3 . 4a - no, 4b-no, 4c-yes, 4d- no, 4e- no, 4f- no, 4g-no, 4h-no, 4i- no, 4j- no, 4k-no, 4l-no, 5- yes, 6-yes, 7-yes, 8-no</text_data><comment_date>2021-11-09T00:00:00</comment_date></row><row _id="row-nbsq~xuq8_hpjy" _uuid="00000000-0000-0000-3D33-9683D1F2736A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nbsq~xuq8_hpjy"><intent_id>784862</intent_id><project_id>759695</project_id><text_data>Made corrections 9/1/2016CE</text_data><comment_date>2016-09-01T00:00:00</comment_date></row><row _id="row-yp9w.xas5-5br9" _uuid="00000000-0000-0000-DD74-2EC7E7987DD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yp9w.xas5-5br9"><intent_id>558011</intent_id><project_id>702373</project_id><text_data>131022 Install 21 cat6 cables, term, test and label. Install 713 wireless access points using existing cabling.</text_data><comment_date>2013-02-27T00:00:00</comment_date></row><row _id="row-zvm6-mpy2_h8y6" _uuid="00000000-0000-0000-717F-0A01DD391DE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zvm6-mpy2_h8y6"><intent_id>1091240</intent_id><project_id>903726</project_id><comment_date>2020-09-25T00:00:00</comment_date></row><row _id="row-xyjm-ztws.t4pz" _uuid="00000000-0000-0000-72B1-749D01748822" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xyjm-ztws.t4pz"><intent_id>524131</intent_id><project_id>688339</project_id><text_data>Remove biological and refuse/debris from a homeless campGeneral Laborers to clean refuse/debris using brooms, shovels and/or small hand tools</text_data><comment_date>2012-07-24T00:00:00</comment_date></row><row _id="row-jsqg.fucy_b6ka" _uuid="00000000-0000-0000-E4C6-CFAAE3B612ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jsqg.fucy_b6ka"><intent_id>687290</intent_id><project_id>759193</project_id><text_data>A) Cleaning &amp; caulking concrete joint cracksB) We are the prime contractors with no subsC) Hand tools only</text_data><comment_date>2015-04-16T00:00:00</comment_date></row><row _id="row-b62s~6g68~js5j" _uuid="00000000-0000-0000-D03B-3B8DE2469624" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b62s~6g68~js5j"><intent_id>953474</intent_id><project_id>862374</project_id><text_data>Job 150352-125</text_data><comment_date>2019-01-04T00:00:00</comment_date></row><row _id="row-48vx-6wcy~pn9e" _uuid="00000000-0000-0000-0F8A-72F8DDDF18D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48vx-6wcy~pn9e"><intent_id>657746</intent_id><project_id>745581</project_id><text_data>Form filed by: Daryl L Hoyt</text_data><comment_date>2014-09-30T00:00:00</comment_date></row><row _id="row-d5kn.xuiu-nnzw" _uuid="00000000-0000-0000-D211-86E1BA3696C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d5kn.xuiu-nnzw"><intent_id>882791</intent_id><project_id>841182</project_id><text_data>Filed by Jessica Bos</text_data><comment_date>2018-01-10T00:00:00</comment_date></row><row _id="row-ajzt-us7p_sjxs" _uuid="00000000-0000-0000-FC51-27DE808504D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ajzt-us7p_sjxs"><intent_id>682226</intent_id><project_id>734899</project_id><text_data>2)apartments3)24)family living5)</text_data><comment_date>2015-03-05T00:00:00</comment_date></row><row _id="row-k3df-k4c4~4w5b" _uuid="00000000-0000-0000-1725-47407B6AA3A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3df-k4c4~4w5b"><intent_id>568297</intent_id><project_id>710460</project_id><text_data>TELECOMMUNICATION TECHNICIANS WILL BE INSTALLING CABLE FOR WORKSTATIONS FOR THE NEW DEPT OF LICENSING  SPACE.</text_data><comment_date>2013-05-16T00:00:00</comment_date></row><row _id="row-3fsj-rnxp~vy32" _uuid="00000000-0000-0000-B7B4-6F0ED1A8995A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3fsj-rnxp~vy32"><intent_id>753607</intent_id><project_id>788244</project_id><text_data>Job # 106698-001</text_data><comment_date>2016-03-28T00:00:00</comment_date></row><row _id="row-zdrr.s6h7.yedy" _uuid="00000000-0000-0000-ADDF-02CB43AA5CE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdrr.s6h7.yedy"><intent_id>1170133</intent_id><project_id>975563</project_id><text_data>Add cat6 data drops inside high school and gym, inside elementary school and admin/cafeteria. All drops are cat6 cable.</text_data><comment_date>2021-08-18T00:00:00</comment_date></row><row _id="row-avkm-zisz~pyqb" _uuid="00000000-0000-0000-B64B-0E7AF9A230C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-avkm-zisz~pyqb"><intent_id>662932</intent_id><project_id>747693</project_id><text_data>Remove 8' chain link fence and re install to new property line location, 6725 NE Randolf Road Moses Lake..</text_data><comment_date>2014-10-29T00:00:00</comment_date></row><row _id="row-aw68_ut37_cp33" _uuid="00000000-0000-0000-3BB0-16D19D486344" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aw68_ut37_cp33"><intent_id>616124</intent_id><project_id>729074</project_id><text_data>Started and completed job on 2/12/14.  Owner of company only employee and only one who worked on the job.</text_data><comment_date>2014-02-12T00:00:00</comment_date></row><row _id="row-iy8f~7rt9~2cub" _uuid="00000000-0000-0000-480C-D00D152D307A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iy8f~7rt9~2cub"><intent_id>1053698</intent_id><project_id>916866</project_id><text_data>Prime Job # 1005277</text_data><comment_date>2020-04-24T00:00:00</comment_date></row><row _id="row-cpmb-s463-ujda" _uuid="00000000-0000-0000-F43C-FC4EA409F931" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cpmb-s463-ujda"><intent_id>594244</intent_id><project_id>715040</project_id><text_data>Our portion of the project is to apply hydroseed per specs on designated and prepared area using a hydroseed installation truck. Hydroseeding is a one-step process.</text_data><comment_date>2013-09-17T00:00:00</comment_date></row><row _id="row-b676.4kyn_m2q6" _uuid="00000000-0000-0000-57E4-9D30030AEBCD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b676.4kyn_m2q6"><intent_id>1007478</intent_id><project_id>885526</project_id><text_data>HIRED BY TYEE CONCRETE CONSTRUCTION</text_data><comment_date>2019-09-16T00:00:00</comment_date></row><row _id="row-myvj~9msd~ruv6" _uuid="00000000-0000-0000-D4A5-5B0F7C79D98C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-myvj~9msd~ruv6"><intent_id>1024131</intent_id><project_id>900072</project_id><text_data>District wide AES radios and installation.</text_data><comment_date>2019-11-27T00:00:00</comment_date></row><row _id="row-2ktc.575y-953u" _uuid="00000000-0000-0000-B08B-3335D80A8CBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ktc.575y-953u"><intent_id>917362</intent_id><project_id>855699</project_id><text_data>Cleaning of Floor drains &amp; Floor sinks in Kitchen. Cleaning of out going line of Grease trap.Hydro Jetting of Mainline.</text_data><comment_date>2018-07-11T00:00:00</comment_date></row><row _id="row-uw7g~6kx7~3nu7" _uuid="00000000-0000-0000-A35E-AE9F22E144D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uw7g~6kx7~3nu7"><intent_id>565505</intent_id><project_id>709129</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the listed crafts/trades/occupations.</text_data><comment_date>2013-04-22T00:00:00</comment_date></row><row _id="row-2m2m~ng9h_k5ak" _uuid="00000000-0000-0000-C0E8-8B636510AE43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2m2m~ng9h_k5ak"><intent_id>649688</intent_id><project_id>742527</project_id><text_data>Form filed by: Mark Metcalf</text_data><comment_date>2014-08-21T00:00:00</comment_date></row><row _id="row-nrdz.z76d_hjam" _uuid="00000000-0000-0000-6A27-795BF24CC2B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrdz.z76d_hjam"><intent_id>860366</intent_id><project_id>831678</project_id><text_data>contract award amount is $899.60 flat rate which includes wa state sales tax.</text_data><comment_date>2017-09-01T00:00:00</comment_date></row><row _id="row-yiys~3cdn.33kk" _uuid="00000000-0000-0000-4BD9-40AC4702383E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yiys~3cdn.33kk"><intent_id>877257</intent_id><project_id>833073</project_id><text_data>0517114</text_data><comment_date>2017-12-01T00:00:00</comment_date></row><row _id="row-8wup~t5pk-bc8h" _uuid="00000000-0000-0000-FCFE-091956B20245" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8wup~t5pk-bc8h"><intent_id>492354</intent_id><project_id>469938</project_id><text_data>re-fileing - filed under wrong contractor originally</text_data><comment_date>2011-12-07T00:00:00</comment_date></row><row _id="row-dk25_uszf_az6v" _uuid="00000000-0000-0000-7D6F-2298F388B4CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dk25_uszf_az6v"><intent_id>1132917</intent_id><project_id>956568</project_id><text_data>Project# 02403, Miller, Edla, 5921 E 19th, Spokane Valley, WA 99212</text_data><comment_date>2021-04-08T00:00:00</comment_date></row><row _id="row-icy5~uz7w.sih3" _uuid="00000000-0000-0000-85CC-093277633D5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-icy5~uz7w.sih3"><intent_id>1100890</intent_id><project_id>938692</project_id><comment_date>2020-11-17T00:00:00</comment_date></row><row _id="row-k3p5~c6e2-mbag" _uuid="00000000-0000-0000-89CE-D8173F1E7450" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3p5~c6e2-mbag"><intent_id>1043875</intent_id><project_id>911530</project_id><text_data>Other Truck is a Water Truck</text_data><comment_date>2020-03-09T00:00:00</comment_date></row><row _id="row-pcq2-3bvm_rag4" _uuid="00000000-0000-0000-B486-98A449929EEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pcq2-3bvm_rag4"><intent_id>606171</intent_id><project_id>724603</project_id><text_data>3522 E. 22nd Spokane 992236521 N. Drumheller Spokane 99208503 W. Bridges #4 Deer Park 99006727 E. Garland	Spokane	99207Question 1: weatherization on low-income homes. Question #2; all addresses above are single-family addresses Question #3: all single family homes are one or two levels. Question 4 (a): no commercial use (b): no retail use (c): yes, all permanent residences (d) no rehab homes (e): no transitional housing (f)no communal dining rooms (g): no treatment services (h): no dormitories (i): no counseling services (j):no rooms rented separatelyQuestion #5: yes each home has its own kitchen Question #6: Yes, each home has a bathroom Question #7: no manager's offices Question #8: no structures are for the public, only the private owner of the home.4223 E. 2nd Spokane 992022002 E. Empire	Spokane	992071711 E. Bismark	Spokane	9920810511 E. Day Mt Spokane Mead 990212613 N. Stone	Spokane	992071218 W. Gordon	Spokane	9920520508 N. Little Spokane Dr. Colbert 9900521003 N. Spotted Rd. Deer Park 99006304 S. Conklin Rd. #19 Spokane Valley 990377707 E. Augusta	Spokane Valley 99212724 W. Chelan Spokane 992052811 W. Francis	Spokane	992051317 E. Evergreen Deer Park 990063407 N. Velux Spokane Valley 9921620125 S. Malloy Prairie	Cheney	990042522 E. Wellesley Spokane 99217</text_data><comment_date>2013-11-25T00:00:00</comment_date></row><row _id="row-xf8f.x5f2.cnsc" _uuid="00000000-0000-0000-9255-84705C2FF7B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xf8f.x5f2.cnsc"><intent_id>1046606</intent_id><project_id>911437</project_id><text_data>0820025</text_data><comment_date>2020-03-19T00:00:00</comment_date></row><row _id="row-pnrt~bwnc.b2nf" _uuid="00000000-0000-0000-C964-E2B7567AE01A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pnrt~bwnc.b2nf"><intent_id>1176123</intent_id><project_id>934152</project_id><text_data>WAI job 20772-6</text_data><comment_date>2021-09-09T00:00:00</comment_date></row><row _id="row-xm5s~zajm_mu76" _uuid="00000000-0000-0000-3550-A288FB113B47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xm5s~zajm_mu76"><intent_id>1227169</intent_id><project_id>978059</project_id><text_data>65544-1</text_data><comment_date>2022-04-20T00:00:00</comment_date></row><row _id="row-n4ag~6na7_jh2r" _uuid="00000000-0000-0000-AC64-19BC7FABA5EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n4ag~6na7_jh2r"><intent_id>970298</intent_id><project_id>877878</project_id><text_data>Install new 200AMP underground mobile home post mounted meter and disconnect. mobile home. 1. living. no. no. yes. no.no.no.no.no.no.no.no.yes. yes. no.no.</text_data><comment_date>2019-04-08T00:00:00</comment_date></row><row _id="row-3qfk_t2ke-6bac" _uuid="00000000-0000-0000-C825-94A4C83FF8CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3qfk_t2ke-6bac"><intent_id>669075</intent_id><project_id>750387</project_id><text_data>Project Details:This project includes construction of cast concrete stone stairs, handrails, stabilized aggregate trails, trail abandonment and restoration, miscellaneous concrete flatwork, wood fencing and landscape restoration/repairs. We will do: Trail Improvements which include:Excavation/backfill/compaction for stairs and trailsImported crushed aggregate base compacted for trails and stairsImported decomposed granite aggregate with stabilizer for trailsCast Stone stair treadsWeathering steel stairway railingsCast in place concrete landingsMarker post relocation and Construction safety fencingLandscape Restoration which includes:Trail scarificationImported planting soilImported landscape boulders and relocation of salvaged bouldersJute fiber meshImported pine straw mulchNative plantings and seedingSite Demolition which includes:Pavement sawcut/removal/disposalRock boulder and rock step removal and salvageTimber tread removalConcrete bumper block removalWood fence removalLog and wood debris removal/salvageTrail clearing and grubbingSteel bollard removalWe will be using the following equipment:mini excavatorDingo-walk behind loaderskid steerclamp for lifting the concrete stairsshovelsrakesThey only work I thought would be under the landscaping labor rate would be the planting and seeding of native plants and mulching the areas.</text_data><comment_date>2015-01-27T00:00:00</comment_date></row><row _id="row-g8jd.igdk.gknu" _uuid="00000000-0000-0000-13F0-A5BDD9DB9350" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8jd.igdk.gknu"><intent_id>945152</intent_id><project_id>866207</project_id><text_data>Filed by Travis Parke - Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2018-11-09T00:00:00</comment_date></row><row _id="row-avx5.3j73~eya3" _uuid="00000000-0000-0000-656B-29F9B0CEF893" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-avx5.3j73~eya3"><intent_id>893819</intent_id><project_id>844567</project_id><text_data>Filed by Lauri Amverhuge</text_data><comment_date>2018-03-20T00:00:00</comment_date></row><row _id="row-ae8x~wxuh~xkfv" _uuid="00000000-0000-0000-4F8A-63EA36C37AC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ae8x~wxuh~xkfv"><intent_id>1265455</intent_id><project_id>1030390</project_id><text_data>INV # 89048369 SR # 52656302</text_data><comment_date>2022-09-09T00:00:00</comment_date></row><row _id="row-r388~uqqk.xgdb" _uuid="00000000-0000-0000-6E52-B3DF62AD943E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r388~uqqk.xgdb"><intent_id>591377</intent_id><project_id>719108</project_id><text_data>MMCI#013431</text_data><comment_date>2013-09-03T00:00:00</comment_date></row><row _id="row-si95-94mz~mmhh" _uuid="00000000-0000-0000-B236-AD3924C69550" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-si95-94mz~mmhh"><intent_id>590591</intent_id><project_id>717029</project_id><text_data>TRUCK DRIVER OTHER USED FOR TRUCK MOUNTED PICKUP SWEEPER</text_data><comment_date>2013-08-28T00:00:00</comment_date></row><row _id="row-ipe2.cyhj~2cp6" _uuid="00000000-0000-0000-D6A1-19295B72E6D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ipe2.cyhj~2cp6"><intent_id>896807</intent_id><project_id>847548</project_id><text_data>PTI SO 135509</text_data><comment_date>2018-04-04T00:00:00</comment_date></row><row _id="row-za3y_myjw.n5jh" _uuid="00000000-0000-0000-939E-3518AD23165B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-za3y_myjw.n5jh"><intent_id>486193</intent_id><project_id>580622</project_id><text_data>Refiling intent 314492 wrong general contractor. Job 30117</text_data><comment_date>2011-10-27T00:00:00</comment_date></row><row _id="row-p5nt.qtch_k22d" _uuid="00000000-0000-0000-9D00-FD96CD3692F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p5nt.qtch_k22d"><intent_id>981204</intent_id><project_id>881402</project_id><text_data>Filed by Moses Puris</text_data><comment_date>2019-05-30T00:00:00</comment_date></row><row _id="row-aggd-kt48~whc2" _uuid="00000000-0000-0000-79FA-DB38C2A699A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aggd-kt48~whc2"><intent_id>1253566</intent_id><project_id>1009362</project_id><text_data>VE 19177</text_data><comment_date>2022-07-29T00:00:00</comment_date></row><row _id="row-na4z.3hk6~ubqe" _uuid="00000000-0000-0000-1F26-98319195635E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-na4z.3hk6~ubqe"><intent_id>1195977</intent_id><project_id>989653</project_id><comment_date>2021-11-30T00:00:00</comment_date></row><row _id="row-tywb~rvyt_axek" _uuid="00000000-0000-0000-C24D-5B931F38AAA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tywb~rvyt_axek"><intent_id>1465720</intent_id><project_id>1144627</project_id><text_data>Apprentice Utilization is NOT required. This form keeps auto-populating to 'Yes' answer for that question; I have tried changing the answer to 'No' and saving, but when I re-open the form it auto-populates 'Yes' again.</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-5q4a-h5a3.xbqg" _uuid="00000000-0000-0000-7671-040A9503E140" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5q4a-h5a3.xbqg"><intent_id>1469245</intent_id><project_id>1146403</project_id><text_data>9947023</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-8s84~gyaq.azar" _uuid="00000000-0000-0000-20FA-69003346BE9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8s84~gyaq.azar"><intent_id>1469418</intent_id><project_id>1058137</project_id><text_data>$34.37 fringe consists of Pension $11.00, Health/Welfare $10.15, Vacation/PTO $2.65, Apprenticeship $0.87, All other $9.70 (Annuity $9.35 &amp; Impact $0.35)</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-m45i-uqqd.i2ne" _uuid="00000000-0000-0000-8133-DED4AD78C649" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m45i-uqqd.i2ne"><intent_id>1469472</intent_id><project_id>1146523</project_id><text_data>MMFS - 73246966</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-yksr~7hvg~vbtm" _uuid="00000000-0000-0000-AFAA-22A4B20E1268" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yksr~7hvg~vbtm"><intent_id>1464132</intent_id><project_id>1143805</project_id><text_data>W1000070343 - Intent</text_data><comment_date>2024-09-06T00:00:00</comment_date></row><row _id="row-8hxx_f7zm~7xym" _uuid="00000000-0000-0000-1BE6-223C5DF306E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8hxx_f7zm~7xym"><intent_id>1509691</intent_id><project_id>1170531</project_id><text_data>Install new high efficiency heating &amp; cooling system.Single family dwelling.1 story with basement and attached garage.(a) no( b) no (c) yes (d) no (e) no (f) no (g) no (h) no (i) no (j)no (k) no (l) noNANANANA</text_data><comment_date>2025-02-13T00:00:00</comment_date></row><row _id="row-vu9c.7ja5.hxsn" _uuid="00000000-0000-0000-9C55-3FDB7C1B11EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vu9c.7ja5.hxsn"><intent_id>1469142</intent_id><project_id>1101994</project_id><text_data>our job# 2010-07-4817</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-c9jd-ms26-hesj" _uuid="00000000-0000-0000-F1B3-8A6FE70556CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9jd-ms26-hesj"><intent_id>656299</intent_id><project_id>736727</project_id><text_data>Form filed by: Michael HummelExemption Intent Questionnaire form � Seattle City Light NSC AnnexPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.	What is the specific purpose of this awarding agency's public works project? Existing building remodel and expansion project. 2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No.3. Does this project entail the remodeling or new construction of a facility? Yes, but not performed by Siemens employees.4. If your firm is working upon a type of building system, what type of system is involved? HVAC/refrigeration control system.5. What specific tasks did your employees perform? Siemens' BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system's functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs a Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.6. What, if any, tools did your employees use in the performance of those tasks? Laptop computer.7. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No - None.8. Are you going to be hiring any subcontractors for this project? Yes.***************************To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification�, �commissioning� or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2014-09-23T00:00:00</comment_date></row><row _id="row-sq3x~9my2~3km4" _uuid="00000000-0000-0000-E16F-0DC45DE54D87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sq3x~9my2~3km4"><intent_id>998595</intent_id><project_id>889888</project_id><text_data>Marysville Middle</text_data><comment_date>2019-08-09T00:00:00</comment_date></row><row _id="row-4cmv_wazm-hi8u" _uuid="00000000-0000-0000-114B-7D45ABB76646" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4cmv_wazm-hi8u"><intent_id>636185</intent_id><project_id>718626</project_id><text_data>INSTALLING CATAGORY 6 AND FIBER FOR DATA INSIDE THE CHIEF JOSEPH APARTMENTS AS REQUESTED.  PLEASE REFERENCE POWERCOM JOB #420379</text_data><comment_date>2014-07-02T00:00:00</comment_date></row><row _id="row-bezm-zf7z_73g3" _uuid="00000000-0000-0000-474D-32DF0CB62B9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bezm-zf7z_73g3"><intent_id>1071566</intent_id><project_id>919198</project_id><text_data>Filed by Robin RomansACI # 20-021</text_data><comment_date>2020-07-12T00:00:00</comment_date></row><row _id="row-uqcy.8vyy.sycy" _uuid="00000000-0000-0000-E9A0-D6AB8FBF87FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uqcy.8vyy.sycy"><intent_id>1178924</intent_id><project_id>980025</project_id><text_data>INSTALL CUSTOMER PROVIDED WIRELESS ACCESS POINTS. PROVIDE AND INSTALL CAT6A PATCH CORD FOR EACH DEVISE.</text_data><comment_date>2021-09-20T00:00:00</comment_date></row><row _id="row-fyiw.684i.qj6r" _uuid="00000000-0000-0000-B1BC-CC2EFC033CBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fyiw.684i.qj6r"><intent_id>1267061</intent_id><project_id>1024719</project_id><text_data>TRUCK DRIVER - OTHER' USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCKMiles #22119</text_data><comment_date>2022-09-15T00:00:00</comment_date></row><row _id="row-iyjm~m3tu~8z6c" _uuid="00000000-0000-0000-A458-63AD1889797C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iyjm~m3tu~8z6c"><intent_id>751866</intent_id><project_id>787430</project_id><text_data>(1)INSULATION (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO B-NO C-YES D-NO E-NO F-NO G-NO H-NO I-NO J-NO K-? (5)YES (6)YES (7)NO (8)NO</text_data><comment_date>2016-03-16T00:00:00</comment_date></row><row _id="row-hcsf-a5kw.yjw7" _uuid="00000000-0000-0000-4336-1D7C691B7671" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hcsf-a5kw.yjw7"><intent_id>633380</intent_id><project_id>704635</project_id><text_data>From: Karen Aguiling [mailto:kaguiling@cascadeconcretesawing.com] Sent: Wednesday, July 15, 2015 10:21 AMTo: Herman, Laura E (LNI)Cc: Christine.Wulfert@Mortenson.comSubject: Intent #633380Hello, Laura.I would like to correct the notes on our intent #633380 and affidavit #523904.  It should read BP99, not bid package #1.Thank you for your help.Karen E Aguiling Controller Cascade Concrete Sawing &amp; Drilling 253-872-7578 kaguiling@cascadeconcretesawing.com</text_data><comment_date>2015-07-15T00:00:00</comment_date></row><row _id="row-h84q-dtic-d2p5" _uuid="00000000-0000-0000-104A-1285F78EEABD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h84q-dtic-d2p5"><intent_id>971490</intent_id><project_id>878412</project_id><text_data>The project is to install a cured in place liner into existing sewer lines without digging them up - no excavation.  Michels to perform all work through existing manholes.</text_data><comment_date>2019-04-15T00:00:00</comment_date></row><row _id="row-m48z~w4ab.gbvw" _uuid="00000000-0000-0000-282F-F9534EDF5C4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m48z~w4ab.gbvw"><intent_id>666190</intent_id><project_id>749026</project_id><text_data>1.) Replace electric water heater; Replace toilet with new Kohler Wellworth toilet, replace Moen three handle tub/shower valve, 2.) yes, 3.)1, 4.)a.no, b.no, c.yes, d.no, e.no, f.no, g.no, h.no, i.no, j.no, k.no, 5.)yes, 6.) yes, 7.)managers office, 8.) no</text_data><comment_date>2014-11-18T00:00:00</comment_date></row><row _id="row-g8zr-xicx~zg46" _uuid="00000000-0000-0000-1FF5-2A8BE9CCE6BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8zr-xicx~zg46"><intent_id>450486</intent_id><project_id>662583</project_id><text_data>Project Name-Central Library L-2 Mobile Services AlterationsContract#-WO#2011-308  CCE#71610-0110</text_data><comment_date>2011-04-10T00:00:00</comment_date></row><row _id="row-bv64~9k2w.7db9" _uuid="00000000-0000-0000-AD80-E37D974B1CB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bv64~9k2w.7db9"><intent_id>684874</intent_id><project_id>755628</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2015-03-20T00:00:00</comment_date></row><row _id="row-grh2.vemg~y9sr" _uuid="00000000-0000-0000-9507-53881A465F64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-grh2.vemg~y9sr"><intent_id>733380</intent_id><project_id>777719</project_id><text_data>Leo Firth  single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height. The home is not open to the public and does not have a business. The electricians will be installing bathroom and kitchen fans. This job meets the residential job requirements.</text_data><comment_date>2015-11-30T00:00:00</comment_date></row><row _id="row-iyfv.i653~wyb8" _uuid="00000000-0000-0000-3EFF-9CAC92415631" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iyfv.i653~wyb8"><intent_id>1033380</intent_id><project_id>905493</project_id><text_data>Our part of the project was Retaining Pond Restoration, Ponds 1&amp;2. Remove all vegetation within retention swales, dispose of debris off site.  Correct grade from fence to waterline. Hydroseed both swales. Remove all vegetation on center berm, dispose of debris off site.</text_data><comment_date>2020-03-16T00:00:00</comment_date></row><row _id="row-s3w3~4g5u~6vim" _uuid="00000000-0000-0000-E7CE-ADB9DA204F44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s3w3~4g5u~6vim"><intent_id>582875</intent_id><project_id>685906</project_id><text_data>NWC Invoice No.  10652632@ 5.75 Hrs</text_data><comment_date>2013-07-23T00:00:00</comment_date></row><row _id="row-ez3y~bc6v~fkhj" _uuid="00000000-0000-0000-7235-B629C938949E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ez3y~bc6v~fkhj"><intent_id>490868</intent_id><project_id>678922</project_id><text_data>Diand Casad</text_data><comment_date>2011-11-27T00:00:00</comment_date></row><row _id="row-wik4.gpts-za88" _uuid="00000000-0000-0000-E7CE-D595E0908A55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wik4.gpts-za88"><intent_id>1118759</intent_id><project_id>948549</project_id><text_data>This contract is for April 2021 &amp; 2022</text_data><comment_date>2021-01-29T00:00:00</comment_date></row><row _id="row-js34_kj48~75jp" _uuid="00000000-0000-0000-AFD5-1E147B2AF49F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-js34_kj48~75jp"><intent_id>820807</intent_id><project_id>814629</project_id><text_data>Job #110771-001 related to 201798-002</text_data><comment_date>2017-03-15T00:00:00</comment_date></row><row _id="row-rfe8-a2sw-z2ie" _uuid="00000000-0000-0000-F2BE-55984C667A30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rfe8-a2sw-z2ie"><intent_id>545269</intent_id><project_id>700007</project_id><text_data>Upon recieving the correction notice, the wages of General Laborer and Truck Driver/ Equipment Operator are being added and will be paid.</text_data><comment_date>2012-11-30T00:00:00</comment_date></row><row _id="row-99ma~bthz~8z3e" _uuid="00000000-0000-0000-5FDA-EE9B14120DE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-99ma~bthz~8z3e"><intent_id>664927</intent_id><project_id>748510</project_id><text_data>Worksites:Duikete:  3255 Haynie Road, Custer, WA 98240Daugert:  4000 Flynn St, Bellingham, WA 98229Swanson:  2210 Monroe St, Bellingham, WA 98225Smith:    1200 Lincoln St, Bellingham, WA 98225Dykstra:  6189 Bellwood Dr, Maple Falls, WA 982261.  insulation, duct repair, fan installation2.  single family3.  14.  a. no b. no c. yes d. no e. no f. no g. no h. no i. no j. no5.  yes6.  yes7.  no... a couple of the homes are mobile homes in a park with a manager's house8.  no</text_data><comment_date>2014-11-11T00:00:00</comment_date></row><row _id="row-cjve.n872_ag37" _uuid="00000000-0000-0000-013D-B4BB32845D6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjve.n872_ag37"><intent_id>944590</intent_id><project_id>861462</project_id><text_data>Filed by Linnie Shaver</text_data><comment_date>2018-11-07T00:00:00</comment_date></row><row _id="row-8g4n-s88c_vex7" _uuid="00000000-0000-0000-94B5-76A9B54407D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8g4n-s88c_vex7"><intent_id>1243101</intent_id><project_id>1005608</project_id><text_data>9894614</text_data><comment_date>2022-06-21T00:00:00</comment_date></row><row _id="row-wsrn-vdw5.eszz" _uuid="00000000-0000-0000-4439-F869A298216D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wsrn-vdw5.eszz"><intent_id>516239</intent_id><project_id>687272</project_id><text_data>Form filed by: Jerry Miller</text_data><comment_date>2012-06-11T00:00:00</comment_date></row><row _id="row-j6r9-vysg~svba" _uuid="00000000-0000-0000-0B00-460BD9F65801" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j6r9-vysg~svba"><intent_id>1234685</intent_id><project_id>922924</project_id><text_data>25032</text_data><comment_date>2022-05-18T00:00:00</comment_date></row><row _id="row-acsj-8nm5_qexa" _uuid="00000000-0000-0000-6916-B417C9E8A5D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-acsj-8nm5_qexa"><intent_id>1019520</intent_id><project_id>881028</project_id><text_data>Titan job# 1909TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2019-11-04T00:00:00</comment_date></row><row _id="row-yhte-pw39-dd9g" _uuid="00000000-0000-0000-C160-E7F7CE0EBE90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yhte-pw39-dd9g"><intent_id>787904</intent_id><project_id>801941</project_id><text_data>Filed by Linda Burdick.</text_data><comment_date>2016-09-08T00:00:00</comment_date></row><row _id="row-366x-r36f_z935" _uuid="00000000-0000-0000-0890-895946A52D7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-366x-r36f_z935"><intent_id>852279</intent_id><project_id>825636</project_id><text_data>1170087</text_data><comment_date>2017-08-03T00:00:00</comment_date></row><row _id="row-89k5~iqh5-dyy3" _uuid="00000000-0000-0000-AC4D-DC319E20A5DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89k5~iqh5-dyy3"><intent_id>757293</intent_id><project_id>781851</project_id><text_data>All Electrical work will be done in Single Family Residences.  None will have commercial use or will have any use other than a Single Family Residence</text_data><comment_date>2016-04-19T00:00:00</comment_date></row><row _id="row-m38v-9w46.mevw" _uuid="00000000-0000-0000-78B7-ECCFC50D1AED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m38v-9w46.mevw"><intent_id>1114340</intent_id><project_id>946073</project_id><text_data>#1 � The crew will be replacing the wooden siding that was damaged due to rodents#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2021-01-11T00:00:00</comment_date></row><row _id="row-esk7.35uj.2dm8" _uuid="00000000-0000-0000-44F1-521174A39AE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-esk7.35uj.2dm8"><intent_id>1110625</intent_id><project_id>943966</project_id><text_data>Material will be paid W/ PO B8691-28       Labor will be paid W/ PO B8692-21</text_data><comment_date>2020-12-17T00:00:00</comment_date></row><row _id="row-gr3n.45kj_rapq" _uuid="00000000-0000-0000-63FD-F15465F0E8F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gr3n.45kj_rapq"><intent_id>1509325</intent_id><project_id>1170310</project_id><text_data>Enumclaw SD #304443</text_data><comment_date>2025-02-12T00:00:00</comment_date></row><row _id="row-rrgs~3a6w.nrqg" _uuid="00000000-0000-0000-BB10-2F721EE7AF5B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rrgs~3a6w.nrqg"><intent_id>877085</intent_id><project_id>838465</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-11-30T00:00:00</comment_date></row><row _id="row-w7d3_v2xt-6f99" _uuid="00000000-0000-0000-D433-77E39C075E22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w7d3_v2xt-6f99"><intent_id>921374</intent_id><project_id>847347</project_id><text_data>Angie Tiesort1. Clean &amp; Tune Pellet Stove2. Single Family3. 14. A-B- NO, C Yes, D-L No, 5. Yes6. Yes7. No8. No</text_data><comment_date>2018-07-27T00:00:00</comment_date></row><row _id="row-2ivm.r2rz_7myg" _uuid="00000000-0000-0000-5234-9D5F3203F212" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ivm.r2rz_7myg"><intent_id>1208591</intent_id><project_id>997764</project_id><text_data>9882906</text_data><comment_date>2022-02-02T00:00:00</comment_date></row><row _id="row-wsya.myzy-s2w6" _uuid="00000000-0000-0000-8F7C-FD0AD1DBCDD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wsya.myzy-s2w6"><intent_id>1226968</intent_id><project_id>1009317</project_id><text_data>INSTALL LV WIRING TO SUPPORT PA/ACS INTEGRATION. PROGRAM ACS INPUTS AND INSTALL CABLING FOR 7 SCHOOLS TI INTEGRAT WITH EXISTING SYSTEM INTERCOMS.</text_data><comment_date>2022-04-20T00:00:00</comment_date></row><row _id="row-dmnh-7bdb_yrhi" _uuid="00000000-0000-0000-5360-80C96E3BDF52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dmnh-7bdb_yrhi"><intent_id>622687</intent_id><project_id>731709</project_id><text_data>Medical - 8.35; Pension - 9.66; JATC - .68; AMF - .32; LMCC - .10; NLMCC - .01; SAP - .10</text_data><comment_date>2014-03-31T00:00:00</comment_date></row><row _id="row-ht22-xie2~b9gs" _uuid="00000000-0000-0000-A28E-68A6D4BAF8AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ht22-xie2~b9gs"><intent_id>980220</intent_id><project_id>882165</project_id><text_data>(1)INSULATION (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO, B-NO, C-YES, D-NO, E-NO, F-NO, G-NO, H-NO, I-NO, J-NO, K-? (5)YES (6)YES (7)NO (8)NO</text_data><comment_date>2019-05-24T00:00:00</comment_date></row><row _id="row-2ywp~u3kr.6k9v" _uuid="00000000-0000-0000-CC4C-2A19AE096C58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ywp~u3kr.6k9v"><intent_id>449893</intent_id><project_id>662474</project_id><text_data>Fringes:  Vacation = $1.00; NW Pension = $6.43; National Pension = $4.24; Health Care = $8.08; Apprenticeship = $1.00; Organization Trust = $.75; NW Supplemental = $.79</text_data><comment_date>2011-04-21T00:00:00</comment_date></row><row _id="row-s2bp~kepi_c5x6" _uuid="00000000-0000-0000-1DFC-E563283F9BD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s2bp~kepi_c5x6"><intent_id>996848</intent_id><project_id>883039</project_id><text_data>David Mcbride	1541 Hiland Rd.Tieton, WA 98947</text_data><comment_date>2019-08-04T00:00:00</comment_date></row><row _id="row-rzkz-2hv3-vmq3" _uuid="00000000-0000-0000-6EF8-D3B78FECBBE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzkz-2hv3-vmq3"><intent_id>1229028</intent_id><project_id>1010524</project_id><text_data>IBEW 191 Employer Paid Benefits Journeyman and ForemanHealth &amp; Welfare $12.39Money Purchase Annuity $3.25District 9 Pension $8.20National Electrical Benefit Fund Pension $1.48 and $1.79Apprenticeship $0.88Labor Management Cooperation Committee-National Labor Management Cooperation Committee $0.12Contract Administration Fund $0.20Fringe Total $26.52 per hour and $26.83Wage is off $.20 so added it to fringe on Journeyman *$26.72IBEW 191 Employer Paid Benefits for ApprenticeHealth &amp; Welfare $11.39Money Purchase Annuity $2.13District 9 Pension $5.06National Electrical Benefit Fund Pension $1.15Apprenticeship $1.38Labor Management Cooperation Committee-National Labor Management Cooperation Committee $0.12Contract Administration Fund $0.20Fringe Total $21.93</text_data><comment_date>2022-04-27T00:00:00</comment_date></row><row _id="row-esfy.z35i~wcz8" _uuid="00000000-0000-0000-3A80-E70D78F957F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-esfy.z35i~wcz8"><intent_id>882155</intent_id><project_id>840856</project_id><text_data>We perform basic landscape maintenance duties (mowing, weeding, and pruning).  We use lawn mowers, blowers, weed eaters, and various manual hand tools.</text_data><comment_date>2018-01-07T00:00:00</comment_date></row><row _id="row-apba-6ru5-ybgf" _uuid="00000000-0000-0000-C8D8-32F3D5CF34B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-apba-6ru5-ybgf"><intent_id>1082917</intent_id><project_id>925688</project_id><text_data>Labor and materials for installation of low voltage telecommunications cabling inside a school for the purpose of networking personal computers.</text_data><comment_date>2020-08-25T00:00:00</comment_date></row><row _id="row-tt32-24bz_3vpb" _uuid="00000000-0000-0000-AF0C-EBAC9B427134" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tt32-24bz_3vpb"><intent_id>1028273</intent_id><project_id>902731</project_id><text_data>9839516</text_data><comment_date>2019-12-20T00:00:00</comment_date></row><row _id="row-jxmr_t66s-c3s8" _uuid="00000000-0000-0000-F74A-2A6A568BD8CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jxmr_t66s-c3s8"><intent_id>1078930</intent_id><project_id>928448</project_id><text_data>1 apartment turn remodel2 apartment3 34 residential livinga. no be. no c. yes d. no e. no f. no g. no h. no l. no j. no k. no l. n/a5 yes6 yes7 yes8 no</text_data><comment_date>2020-08-10T00:00:00</comment_date></row><row _id="row-7wkr~6f8a_5spf" _uuid="00000000-0000-0000-BADA-F9C8980E3F99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7wkr~6f8a_5spf"><intent_id>759326</intent_id><project_id>789461</project_id><text_data>Project is : Paving and Bridge deck resurfacing. Our work for General Laborer is: - Bridge Deck repair that consists of saw cutting existing concrete, chisel to remove and replace with new concrete. General Laborer will be using the following tools: Small jack hammer, portable concrete mixer, hand tools for concrete - trowels, brooms. Membrane Waterproofing - Deck Seal will entail hand applying adhesive with a standard paint roller &amp; rolling out &amp; applying membrane by hand to the bridge deck surface. Vehicle will be a pickup to carry tools.</text_data><comment_date>2016-04-29T00:00:00</comment_date></row><row _id="row-85az-mnkv-zjc4" _uuid="00000000-0000-0000-0D36-2A7B6B4F5746" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-85az-mnkv-zjc4"><intent_id>739579</intent_id><project_id>778986</project_id><text_data>Work will be done indoors.</text_data><comment_date>2016-01-11T00:00:00</comment_date></row><row _id="row-t2kj.u574-gxts" _uuid="00000000-0000-0000-5AEF-7BEDC58B4A61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t2kj.u574-gxts"><intent_id>1098823</intent_id><project_id>878466</project_id><text_data>Mid Mountain job number 19-123 L300 Civil</text_data><comment_date>2020-10-26T00:00:00</comment_date></row><row _id="row-yamn.3f32_i4zs" _uuid="00000000-0000-0000-A32A-BDEF2252AF35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yamn.3f32_i4zs"><intent_id>1240485</intent_id><project_id>984532</project_id><text_data>Install cameras for Mountain View Dorm rooms</text_data><comment_date>2022-06-10T00:00:00</comment_date></row><row _id="row-fqde-rka6-9xhw" _uuid="00000000-0000-0000-6D3A-FCAE91AB5FE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fqde-rka6-9xhw"><intent_id>1228613</intent_id><project_id>1010294</project_id><text_data>Hand planting of beds across the property as well as Installation of Medium Bark- at a 1' depth in all landscape beds.. installing by hand and with hand tools.</text_data><comment_date>2022-04-26T00:00:00</comment_date></row><row _id="row-ezh3.h5pq_r6mk" _uuid="00000000-0000-0000-AF2B-C09A2778EC6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezh3.h5pq_r6mk"><intent_id>1245840</intent_id><project_id>1015134</project_id><text_data>SPM #27042</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-ste5.k962.d4mq" _uuid="00000000-0000-0000-D888-5B948DD4ECC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ste5.k962.d4mq"><intent_id>898922</intent_id><project_id>843601</project_id><text_data>Filed by Cherie Jenkins</text_data><comment_date>2018-04-17T00:00:00</comment_date></row><row _id="row-2vi4~3jk2_egdx" _uuid="00000000-0000-0000-A483-57BBD504E91A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2vi4~3jk2_egdx"><intent_id>968481</intent_id><project_id>852478</project_id><text_data>Owner/Operator</text_data><comment_date>2019-03-29T00:00:00</comment_date></row><row _id="row-gujm.gf59.5rfq" _uuid="00000000-0000-0000-91E3-91CCB5A47CF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gujm.gf59.5rfq"><intent_id>637011</intent_id><project_id>737809</project_id><text_data>Truck driver will be using a Kenworth T800B tractor to pull the two buildings to the new locations.</text_data><comment_date>2014-06-24T00:00:00</comment_date></row><row _id="row-kcz7~myi7.g3ax" _uuid="00000000-0000-0000-DD80-A8CB242AE67A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kcz7~myi7.g3ax"><intent_id>822998</intent_id><project_id>792708</project_id><text_data>WRS Job #P17-060PW</text_data><comment_date>2017-03-27T00:00:00</comment_date></row><row _id="row-b58c~adgt-vnyr" _uuid="00000000-0000-0000-52E0-F6CC9A6B9CB0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b58c~adgt-vnyr"><intent_id>1190821</intent_id><project_id>986596</project_id><text_data>1.Weatherization 2. single family 3. 1 4. Aa0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2021-11-03T00:00:00</comment_date></row><row _id="row-e4bc_tdm2-xtf3" _uuid="00000000-0000-0000-D686-BCC1BA728A45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e4bc_tdm2-xtf3"><intent_id>1205234</intent_id><project_id>978040</project_id><text_data>S031567</text_data><comment_date>2022-01-18T00:00:00</comment_date></row><row _id="row-c4sj_ced5-ahev" _uuid="00000000-0000-0000-557A-51DF29D6EBD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c4sj_ced5-ahev"><intent_id>1028467</intent_id><project_id>874802</project_id><text_data>FILED BY KIM BURNSIDE</text_data><comment_date>2019-12-23T00:00:00</comment_date></row><row _id="row-wdhq.4h9k~e7n2" _uuid="00000000-0000-0000-2F86-C03D3668A47A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wdhq.4h9k~e7n2"><intent_id>1062105</intent_id><project_id>920367</project_id><text_data>General labor work consists of hand work (shovel work) no power equipment or power tools. Motor patrol grader is used for grading the project site for compaction before paving and/or chip sealing operations. Other trucks consist of a 0-8,000 gallon water truck used for water distribution during the grading process to help with compaction.</text_data><comment_date>2020-06-02T00:00:00</comment_date></row><row _id="row-xg7p-keqc~fdkg" _uuid="00000000-0000-0000-DAD5-5F2D59B9D9B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xg7p-keqc~fdkg"><intent_id>886351</intent_id><project_id>842806</project_id><text_data>This project consist of debris removal as well as restoration and rejuvenation of grass, lawns, bushes, and other native vegetation.</text_data><comment_date>2018-02-02T00:00:00</comment_date></row><row _id="row-8vkh.6si7-f3x8" _uuid="00000000-0000-0000-4B7E-95E72DB767EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8vkh.6si7-f3x8"><intent_id>539929</intent_id><project_id>697417</project_id><text_data>Our work consists of installing 2956 1gallon Grasses, 47 1gallon shrubs, 138 4&amp;quot;pot groundcovers,230 SY seeding, 30 CY bark mulch, 53 LF root barrier along sidewalk</text_data><comment_date>2012-10-15T00:00:00</comment_date></row><row _id="row-ngt9~mswn~x28b" _uuid="00000000-0000-0000-EF2C-BD4E3069CE26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ngt9~mswn~x28b"><intent_id>586059</intent_id><project_id>717198</project_id><text_data>Inv #11161 - PO #P/W13175 $5,460.44</text_data><comment_date>2013-08-07T00:00:00</comment_date></row><row _id="row-annm_bfdb-3ixx" _uuid="00000000-0000-0000-AE68-2EDEE071E7FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-annm_bfdb-3ixx"><intent_id>898056</intent_id><project_id>848085</project_id><text_data>Services being provided by Prime do not include PW obligations. Prime is a professional engineering firm.All PW applicable work will be done by subs.Budget noted is sub budget only.</text_data><comment_date>2018-04-11T00:00:00</comment_date></row><row _id="row-ive4-2w4a.uxh4" _uuid="00000000-0000-0000-D782-57D066DD7BD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ive4-2w4a.uxh4"><intent_id>1041216</intent_id><project_id>910009</project_id><text_data>Install a loked enclosure and Reader to Access Control System</text_data><comment_date>2020-02-26T00:00:00</comment_date></row><row _id="row-ff65.32sn.7xid" _uuid="00000000-0000-0000-6E28-88425EA32254" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ff65.32sn.7xid"><intent_id>697668</intent_id><project_id>763605</project_id><text_data>(1)INSULATION (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO,B-NO,C-YES,D-NO,E-NO,F-NO,G-NO,H-NO,I-NO,J-NO,K-?, (5)YES (6)YES (7)NO (8)NO</text_data><comment_date>2015-06-01T00:00:00</comment_date></row><row _id="row-78gz~9xte~ega9" _uuid="00000000-0000-0000-7DB9-B232AE1B74E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-78gz~9xte~ega9"><intent_id>884875</intent_id><project_id>842148</project_id><text_data>INSTALLATION OF 4 PAIR COMMUNICATIONS CABLING INTERIOR OF THE BUILDING FOR PC CONNECTIVITY.  PROJECT#511758</text_data><comment_date>2018-01-24T00:00:00</comment_date></row><row _id="row-q5sf_2gxd_tct6" _uuid="00000000-0000-0000-7229-FD8FC21CC347" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5sf_2gxd_tct6"><intent_id>746826</intent_id><project_id>785117</project_id><text_data>1=Molloy, 2=Oaks, 3=Sol</text_data><comment_date>2016-02-16T00:00:00</comment_date></row><row _id="row-83y5.tn5s-7v35" _uuid="00000000-0000-0000-7D91-9E2870A8997A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-83y5.tn5s-7v35"><intent_id>1164744</intent_id><project_id>939778</project_id><text_data>1121016</text_data><comment_date>2021-07-29T00:00:00</comment_date></row><row _id="row-95wj-6w73-xhd9" _uuid="00000000-0000-0000-A43A-7D4AA4810D1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-95wj-6w73-xhd9"><intent_id>912964</intent_id><project_id>854049</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT, IT IS A SINGLE RESIDENTIAL DWELLING.</text_data><comment_date>2018-06-21T00:00:00</comment_date></row><row _id="row-38eq~neca.zpnc" _uuid="00000000-0000-0000-E576-4073C69400E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-38eq~neca.zpnc"><intent_id>879096</intent_id><project_id>812249</project_id><text_data>Filed by Don Martin</text_data><comment_date>2017-12-13T00:00:00</comment_date></row><row _id="row-3bfk~8adb.nsin" _uuid="00000000-0000-0000-F5BE-E0274CD8AF36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bfk~8adb.nsin"><intent_id>1055580</intent_id><project_id>917795</project_id><text_data>PC3Job #4253Contract SC-107456CB</text_data><comment_date>2020-05-04T00:00:00</comment_date></row><row _id="row-gukr-z552-vfqh" _uuid="00000000-0000-0000-9BD9-71D2F9AF6282" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gukr-z552-vfqh"><intent_id>846811</intent_id><project_id>826881</project_id><text_data>Nordic Job # 17960</text_data><comment_date>2017-07-12T00:00:00</comment_date></row><row _id="row-2mhs.bhfx_mp83" _uuid="00000000-0000-0000-2887-03A2FB02A2AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2mhs.bhfx_mp83"><intent_id>1063272</intent_id><project_id>896377</project_id><text_data>Stoneway Concrete is a Supplier</text_data><comment_date>2020-06-08T00:00:00</comment_date></row><row _id="row-385c.hgcj_irvf" _uuid="00000000-0000-0000-7365-6936DF6C9FAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-385c.hgcj_irvf"><intent_id>917668</intent_id><project_id>847055</project_id><text_data>BASILIO FAUSTINO370 S REYNOLDS RD. #58OTHELLO, WA 99344</text_data><comment_date>2018-07-12T00:00:00</comment_date></row><row _id="row-yka5_9ix6_shfs" _uuid="00000000-0000-0000-CF7D-57E68629EAD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yka5_9ix6_shfs"><intent_id>710276</intent_id><project_id>768401</project_id><text_data>085070</text_data><comment_date>2015-07-28T00:00:00</comment_date></row><row _id="row-29yj_p9es_yqhd" _uuid="00000000-0000-0000-327F-E52DA4B46289" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-29yj_p9es_yqhd"><intent_id>1317532</intent_id><project_id>1032261</project_id><text_data>OMA job# 1765trucks - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-6m3k_uzr8.iqrz" _uuid="00000000-0000-0000-124D-511E6AEC4426" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6m3k_uzr8.iqrz"><intent_id>1011495</intent_id><project_id>892766</project_id><text_data>16538</text_data><comment_date>2019-10-02T00:00:00</comment_date></row><row _id="row-nxf6~ru46_844j" _uuid="00000000-0000-0000-6EE1-8BBAEF46A04B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nxf6~ru46_844j"><intent_id>1032917</intent_id><project_id>905252</project_id><text_data>Diagnosed lack of heat due to corrosion &amp; burnt up failing sequencer. Replaced sequencer &amp; cleaned blower wheel.</text_data><comment_date>2020-01-21T00:00:00</comment_date></row><row _id="row-pxxc_aikc.mysp" _uuid="00000000-0000-0000-7E9A-DD7497F80AEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pxxc_aikc.mysp"><intent_id>494396</intent_id><project_id>677196</project_id><text_data>Filed by: Thomas Riener</text_data><comment_date>2012-02-07T00:00:00</comment_date></row><row _id="row-sbzu.5x5c~x5q2" _uuid="00000000-0000-0000-C822-299911BFDCD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sbzu.5x5c~x5q2"><intent_id>519620</intent_id><project_id>690660</project_id><text_data>Big Leaf Maple in back green belt to be cut down and removed leaving a roughly 20' tall wildlife snag due to severe decay.</text_data><comment_date>2012-06-28T00:00:00</comment_date></row><row _id="row-rxsw-na87~3qm7" _uuid="00000000-0000-0000-09B7-C84A9BF987F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rxsw-na87~3qm7"><intent_id>955572</intent_id><project_id>870999</project_id><text_data>Subcontractors will be using either their own vehicles or our box truck to move materials to and from the job site. Remove Existing Carpet and Rubber Base in the north fire station.Prep floor for carpet tiles. Install Carpet Tile, &amp; Install Cove Base. Using non-reactive spread adhesive for carpet tile, and tube adhesive for the cove base.</text_data><comment_date>2019-01-16T00:00:00</comment_date></row><row _id="row-9gvx_sqgx~2x6m" _uuid="00000000-0000-0000-2F03-0363F8F953B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9gvx_sqgx~2x6m"><intent_id>1025066</intent_id><project_id>901117</project_id><text_data>Advanced Fire Protection, LLC is an Idaho based company, therefore, our Workman's Compensation Insurance Account is Idaho. Troy Insurance has filed a request for a copy of the extraterritorial filing that was issued many years ago &amp; is having a copy sent to me. The following is our Policy # and effective date. I can send a copy as soon as we receive it; SIF policy #539767; effective 7/1/19-7/1/20.</text_data><comment_date>2019-12-06T00:00:00</comment_date></row><row _id="row-2z9x~79qk_ji7h" _uuid="00000000-0000-0000-3C1C-472BDEF9986F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2z9x~79qk_ji7h"><intent_id>1110012</intent_id><project_id>930821</project_id><text_data>WRS Job #M20-607PW5</text_data><comment_date>2020-12-15T00:00:00</comment_date></row><row _id="row-unx7~junf.id6g" _uuid="00000000-0000-0000-276A-693BE078700C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-unx7~junf.id6g"><intent_id>887000</intent_id><project_id>806726</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trade occupations.</text_data><comment_date>2018-02-07T00:00:00</comment_date></row><row _id="row-cgdn-usvb.vh5t" _uuid="00000000-0000-0000-C6A0-FA4F8C13D01E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cgdn-usvb.vh5t"><intent_id>1040898</intent_id><project_id>909822</project_id><text_data>C) Union boilermaker craftsmen will cut existing covers with plasma cutter, and use welding machine to weld new flanges to existing filter nozzle. 33 ton boom truck to be subcontracted to lift existing covers off and hold new flanges on during welding. Equipment required includes 1-ton service truck, 33-ton boom truck crane, 5000# forklift, plasma cutting torch, welding machine and combination end wrenches.</text_data><comment_date>2020-03-19T00:00:00</comment_date></row><row _id="row-kvwn_pba2_bas7" _uuid="00000000-0000-0000-9B3A-90D75E640594" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvwn_pba2_bas7"><intent_id>565873</intent_id><project_id>709411</project_id><text_data>Filed by: Scott SchwaglerProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2013-04-22T00:00:00</comment_date></row><row _id="row-bvca.4qf5.u6ex" _uuid="00000000-0000-0000-F355-5E05B4288B44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bvca.4qf5.u6ex"><intent_id>692226</intent_id><project_id>758133</project_id><text_data>Fringe Benefits:  Pension/Annuity $14.70   Health/Welfare $6.77  Apprentice/etc  $0.91  Total $22.38</text_data><comment_date>2015-05-01T00:00:00</comment_date></row><row _id="row-vpfb-a35r_ucaw" _uuid="00000000-0000-0000-CD49-EDB14EFE08A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vpfb-a35r_ucaw"><intent_id>910446</intent_id><project_id>853066</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2018-06-11T00:00:00</comment_date></row><row _id="row-yxh2~pnwv-5uni" _uuid="00000000-0000-0000-1440-6B53514F6B0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yxh2~pnwv-5uni"><intent_id>1191936</intent_id><project_id>957521</project_id><text_data>We are an Oregon company- we do not need Washington's Workers' Compensation</text_data><comment_date>2021-12-01T00:00:00</comment_date></row><row _id="row-p3za~z9mz-gq6r" _uuid="00000000-0000-0000-4AF6-6C04913E4080" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p3za~z9mz-gq6r"><intent_id>563735</intent_id><project_id>702627</project_id><text_data>Form filed by: A L Morton</text_data><comment_date>2013-04-09T00:00:00</comment_date></row><row _id="row-i3zb-nsee-8ssa" _uuid="00000000-0000-0000-EF8A-1D26B4B205CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i3zb-nsee-8ssa"><intent_id>736370</intent_id><project_id>780173</project_id><text_data>1.Weatherization 2.Single 3.1 4 living.a. no b. no c. yes d. no e. no f.no g. no h. no i. no j. yes k.? 5. yes 6. yes 7. no 8. no</text_data><comment_date>2015-12-07T00:00:00</comment_date></row><row _id="row-9xzn.8xbn~mg9r" _uuid="00000000-0000-0000-D5F6-BD31B0F27C8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9xzn.8xbn~mg9r"><intent_id>483639</intent_id><project_id>675890</project_id><text_data>For job address:3007 W. Princeton,Spokane,WA 9920513214 E. Mallon Ct,Spokane Valley,WA 99216</text_data><comment_date>2011-10-13T00:00:00</comment_date></row><row _id="row-qu9w~98dk-xvpn" _uuid="00000000-0000-0000-DEF3-030BE7996BED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qu9w~98dk-xvpn"><intent_id>576238</intent_id><project_id>707777</project_id><text_data>Re-establish grass at elementary playfield.  No stream restoration control, no erosion control, no parking lots, no highway beautification.</text_data><comment_date>2013-06-19T00:00:00</comment_date></row><row _id="row-2qkf.ktqn~k6a7" _uuid="00000000-0000-0000-F21D-B7444F5D3F8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2qkf.ktqn~k6a7"><intent_id>513455</intent_id><project_id>688039</project_id><text_data>Some concrete work was performed. 10 bags of concrete total. replaced concrete in four places. Each one was measured at 4 inches wide X four feet long X four inches deep. One man hour.</text_data><comment_date>2012-08-06T00:00:00</comment_date></row><row _id="row-ru87_ey6y-z9ad" _uuid="00000000-0000-0000-93D6-D965C03DDE01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ru87_ey6y-z9ad"><intent_id>983124</intent_id><project_id>880450</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2019-06-07T00:00:00</comment_date></row><row _id="row-p498-pg4w.q53z" _uuid="00000000-0000-0000-2F6C-0694D59E2412" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p498-pg4w.q53z"><intent_id>678495</intent_id><project_id>755390</project_id><text_data>We are delivering and installing (2) Sculptures by local artist Peter Millet in north side patio. We will be using furniture dollies, a concrete saw, and 3 people.</text_data><comment_date>2015-02-09T00:00:00</comment_date></row><row _id="row-eidb_p4gz-tn95" _uuid="00000000-0000-0000-330C-B9FA858DF348" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eidb_p4gz-tn95"><intent_id>1241662</intent_id><project_id>1017837</project_id><text_data>9888072</text_data><comment_date>2022-06-15T00:00:00</comment_date></row><row _id="row-mzpu.63h6.7mrk" _uuid="00000000-0000-0000-751E-49465D8F35DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mzpu.63h6.7mrk"><intent_id>1316954</intent_id><project_id>1061498</project_id><text_data>Was going to hire an employee.  Not at this time for this job</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-6zhm~y3jx-a533" _uuid="00000000-0000-0000-8660-D8C77E48E71F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6zhm~y3jx-a533"><intent_id>1296633</intent_id><project_id>1020537</project_id><text_data>Hello, We wanted to email you based on the information provided below and a conversation I had with Melissa from your office today after calling the number provided in the below email.Melissa stated to me that I needed to send an email contesting the email below because of the conversation I had with her on the following:That the reason behind us getting this email was because we needed to update our Intent due to the fact that we are building non-specific items for the Toppenish project based on the questionnaire that was provided to us and what was answered on question 2. However, after looking over the questions, the interpretation for this question was misread and the answer to this is suppose to be �No� as everything we are building for this project is job specific.This is specifically based on the specs outlined and given to us by our GC when we were awarded the project which was approved by the school district and architect.  Original Question and Request for Correction is listed below*** 2) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a (vi), WAC 296-127-020(3)] - ***CORRECTION (The answer to this is No. All items being fabricated, delivered and or installed for this project are job specific per the specs outlined to when we were awarding the project. There on no non-standard items for this project) /  Original Answer - Yes. The fabrication of casework, ie: built-in cabinets, countertops, drawers, cupboards, and or storage cabinets.</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-ur3r.jhcq_zwmc" _uuid="00000000-0000-0000-4056-C77BD0E77D7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ur3r.jhcq_zwmc"><intent_id>1291275</intent_id><project_id>1022271</project_id><text_data>PR75835 12th Street Bridge</text_data><comment_date>2022-12-20T00:00:00</comment_date></row><row _id="row-efzt~2pkn~nq3i" _uuid="00000000-0000-0000-165C-FE49C17205B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efzt~2pkn~nq3i"><intent_id>499021</intent_id><project_id>682194</project_id><text_data>sorry for the mistake - 1st time filling out form.</text_data><comment_date>2012-02-07T00:00:00</comment_date></row><row _id="row-k3mr~etdd_3wgc" _uuid="00000000-0000-0000-8DC8-EF1F1B6F69C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3mr~etdd_3wgc"><intent_id>1021028</intent_id><project_id>885031</project_id><text_data>will be installing bark mulch and plantings</text_data><comment_date>2019-11-11T00:00:00</comment_date></row><row _id="row-p5f8~t45f-d9cg" _uuid="00000000-0000-0000-5542-BC309D9A4402" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p5f8~t45f-d9cg"><intent_id>1027282</intent_id><project_id>902211</project_id><comment_date>2019-12-17T00:00:00</comment_date></row><row _id="row-aine.6mxn~7cmi" _uuid="00000000-0000-0000-7A20-9B578C89B37F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aine.6mxn~7cmi"><intent_id>1517964</intent_id><project_id>1169220</project_id><text_data>Voice &amp; data transmissions. 0608-04 Telephone and/or telephonic equipment - Prewire by contractor: Installation, service, and/or repair. Installation of Indoor Telecommunications Cabling - Voice &amp; Data Transmissions. Ellensburg, WA.</text_data><comment_date>2025-03-14T00:00:00</comment_date></row><row _id="row-8xgb-aijr.mzre" _uuid="00000000-0000-0000-8D5E-A9527547EABB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8xgb-aijr.mzre"><intent_id>917431</intent_id><project_id>855721</project_id><text_data>From: Jerry Koch &amp;lt;jerry@empowerdigital.com&amp;gt; Sent: Wednesday, July 11, 2018 6:11 PMTo: Ziegert, Charles O (LNI) &amp;lt;ziec235@LNI.WA.GOV&amp;gt;Subject: Intent 917431�	Please do not reply directly to this email. Please respond to Chuck at ziec235@lni.wa.gov with your answers. You have until the close of business on 7/16/2018 to respond to this email or your form, along with the correction(s) needed, will be mailed back to you. **** Please describe the work performed by the Telecommunication Technicians (WAC 296-127-01378) listed on this form. You must include the type(s) of system(s) worked upon (i.e., burglar alarm, door access, telephone cabling, etc.),Telecommunication/Data infrastructure cabling the physical location of the work 1200 Franklin Street Vancouver, WA 98660 and whether the work was performed indoors or outdoors, and the specific nature of the work done to/for the system Telecommunication/Data infrastructure cabling  . This information is necessary to ensure the applicable scope of work classification is listed for this project.</text_data><comment_date>2018-07-12T00:00:00</comment_date></row><row _id="row-xv2t.fynr-jbrx" _uuid="00000000-0000-0000-2554-E399D9FA1A27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xv2t.fynr-jbrx"><intent_id>836407</intent_id><project_id>818697</project_id><text_data>Filed by John Gorton.</text_data><comment_date>2017-05-25T00:00:00</comment_date></row><row _id="row-aqms_3at8_gcfq" _uuid="00000000-0000-0000-B89F-6CBED18B2BA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aqms_3at8_gcfq"><intent_id>986366</intent_id><project_id>884979</project_id><text_data>Crew installed (1) fossil onto wall using 6ft ladders to access the space. Wooden cleat secured to wall using 4 connection points. 3D elements of fossils were then placed by hand into pre-existing holes by following diagram from deinstallation of object.</text_data><comment_date>2019-06-20T00:00:00</comment_date></row><row _id="row-6sh9_i39r-8m5d" _uuid="00000000-0000-0000-92B4-57C29D4FDB1B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6sh9_i39r-8m5d"><intent_id>1093848</intent_id><project_id>859809</project_id><text_data>Certified Erosion and Sediment Control Lead (CESCL) Inspections and Reporting - Inspect best management practices (BMPs) at construction sites, Sample stormwater runoff (fill up 2-inch glass vial with stormwater runoff and run sample in turbidimeter), Complete site inspection forms, Online reporting of stormwater sampling results, Meet onsite to determine inspection needsEquipment: Turbidimeter and glass sample vials (for stormwater sampling when needed. Hand-held device to put stormwater samples (vials) in and measure. Runs on AA batteries)</text_data><comment_date>2020-10-07T00:00:00</comment_date></row><row _id="row-rcd2.z7qg.p9av" _uuid="00000000-0000-0000-B767-73CCA35B75BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rcd2.z7qg.p9av"><intent_id>1158121</intent_id><project_id>969534</project_id><comment_date>2021-07-06T00:00:00</comment_date></row><row _id="row-phyi_b39q~ipyy" _uuid="00000000-0000-0000-C17B-A8BD63E50D1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-phyi_b39q~ipyy"><intent_id>1183286</intent_id><project_id>982388</project_id><text_data>WO #421485</text_data><comment_date>2021-10-05T00:00:00</comment_date></row><row _id="row-5mca-q6rj-98wa" _uuid="00000000-0000-0000-EC5B-B54F48383616" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5mca-q6rj-98wa"><intent_id>885791</intent_id><project_id>842560</project_id><text_data>Maintenance of existing landscape in city park. Tasks: lawn mowing/edging, plant bed debris clean up, shrub pruning, weed removal, raking, leaf removal. Tools: Gas powered lawn mowers 5 &amp; 11 hp; gas powered edgers; 2 cycle hand held line trimmers; 2 cycle leaf blowers; 2 cycle hedge shears; hand pruners; loppers; rakes.</text_data><comment_date>2018-01-30T00:00:00</comment_date></row><row _id="row-huwt.7n55.q9wi" _uuid="00000000-0000-0000-690E-CE4BB7562DC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-huwt.7n55.q9wi"><intent_id>1046086</intent_id><project_id>912827</project_id><text_data>Please note that 'Other Trucks' is an 8,000 gallon water truck.</text_data><comment_date>2020-03-18T00:00:00</comment_date></row><row _id="row-dja4-xcsn-jz4n" _uuid="00000000-0000-0000-D602-2F046AD91FCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dja4-xcsn-jz4n"><intent_id>1106137</intent_id><project_id>941437</project_id><text_data>We are installing Playground Chips into designated play areas. The owner will be performing the installations, while laborers perform cleanup with a leaf blower which falls under the landscape beautification classification. Laborers will be paid the published rate for Groundskeeper under Landscape Maintenance.</text_data><comment_date>2020-11-28T00:00:00</comment_date></row><row _id="row-sax9.sitj-kgvq" _uuid="00000000-0000-0000-D58C-B9B40219AAE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sax9.sitj-kgvq"><intent_id>1076835</intent_id><project_id>927545</project_id><text_data>WO# N88915</text_data><comment_date>2020-07-31T00:00:00</comment_date></row><row _id="row-yhr2_6fzz.cqia" _uuid="00000000-0000-0000-D063-2E738353B3DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yhr2_6fzz.cqia"><intent_id>1161400</intent_id><project_id>971208</project_id><text_data>Job #04113S</text_data><comment_date>2021-07-19T00:00:00</comment_date></row><row _id="row-xpwg~jdes-d2ug" _uuid="00000000-0000-0000-D4BB-557BD9DD2D6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xpwg~jdes-d2ug"><intent_id>1318093</intent_id><project_id>1062442</project_id><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-xrgb.4z2i~enev" _uuid="00000000-0000-0000-82F2-67C04AA22A16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xrgb.4z2i~enev"><intent_id>1200460</intent_id><project_id>992489</project_id><text_data>9883471</text_data><comment_date>2021-12-20T00:00:00</comment_date></row><row _id="row-rssd_njzm~whfg" _uuid="00000000-0000-0000-88A1-D314C298B96D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rssd_njzm~whfg"><intent_id>512373</intent_id><project_id>674735</project_id><text_data>FILED BY JEN MORRISON</text_data><comment_date>2012-05-17T00:00:00</comment_date></row><row _id="row-sqxr-vcie~tfgu" _uuid="00000000-0000-0000-53A3-489F3A9DDEFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqxr-vcie~tfgu"><intent_id>1117470</intent_id><project_id>934519</project_id><text_data>G10050 CBC STUDENT REC CENTER</text_data><comment_date>2021-01-25T00:00:00</comment_date></row><row _id="row-bctc~z7ff.qn3n" _uuid="00000000-0000-0000-0105-02CFB9E5011E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bctc~z7ff.qn3n"><intent_id>1021827</intent_id><project_id>899582</project_id><text_data>In order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2- Single Family3-1-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- nok- no6- no7- no8- no</text_data><comment_date>2019-11-14T00:00:00</comment_date></row><row _id="row-zss9.dhrt_9cm5" _uuid="00000000-0000-0000-6A16-7AF43B7BB24E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zss9.dhrt_9cm5"><intent_id>1318781</intent_id><project_id>1062831</project_id><text_data>SR53473072 invoice 89688433</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-u35y_5a3y-867u" _uuid="00000000-0000-0000-4D92-815B5E12E926" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u35y_5a3y-867u"><intent_id>1318735</intent_id><project_id>1062792</project_id><text_data>sr54200002 invoice 89593637</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-55cw~zxmr-2vdz" _uuid="00000000-0000-0000-E681-7B85E28B9FF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-55cw~zxmr-2vdz"><intent_id>1317642</intent_id><project_id>1062146</project_id><text_data>**Other Trucks - 4,000 gallon water truck</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-jchk-puk5-pvxp" _uuid="00000000-0000-0000-0931-1AF01E45B876" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jchk-puk5-pvxp"><intent_id>1318859</intent_id><project_id>1062888</project_id><text_data>INV # 89680315 SR # 54245420</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-vkh6-xgm3-p5tc" _uuid="00000000-0000-0000-39E5-D3C08188E3BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkh6-xgm3-p5tc"><intent_id>833050</intent_id><project_id>820752</project_id><text_data>Gates are made of steel. Since work has not started we are anticipating the tools that will be required, but this is subject to change during the course of the project. Anticipated tools and equipment required to complete the project include a grinder, welder, and various small tools (i.e. hammers, etc.).</text_data><comment_date>2017-05-24T00:00:00</comment_date></row><row _id="row-4ahh_irds-7pww" _uuid="00000000-0000-0000-FD56-EF41EAC59961" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ahh_irds-7pww"><intent_id>703111</intent_id><project_id>765795</project_id><text_data>�	#1 � Describe work performed.  Rain water had drained into apartments so we dried out the apartments.  �	#2 - Is the structure a single family dwelling, duplex, apartment, condominium or other residential structure? Yes�	#3 - Including any basement or garage, how many stories or levels does the structure have? 1�	#4 - What is the facility used for? --Answer �yes� or �no� to each of the following options: �	(a) Any Commercial use in structure? No�	(b) Any retail use in structure? No�	(c) Permanent residence only? Yes�	(d) Rehabilitation house? No�	(e) Transitional housing? No�	(f) Communal dining facility? No�	(g) Treatment services? No�	(h) Dormitories? No�	(i) Counseling? No�	(j) Is each room and/or bed in the structure rented separately? No�	(k) Other? No �	#5 - Does each dwelling unit have its own self-contained kitchen? Yes�	#6 - Does each dwelling unit have its own bathroom? Yes�	#7 - Is there a community facility or manager�s office on site? No�	#8 - Is any part of the facility used by members of the public? No</text_data><comment_date>2015-06-24T00:00:00</comment_date></row><row _id="row-9baz_3kez_23xy" _uuid="00000000-0000-0000-25C5-913BBF96481E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9baz_3kez_23xy"><intent_id>763934</intent_id><project_id>724146</project_id><text_data>THIS INTENT IS FOR BP # 305</text_data><comment_date>2016-05-24T00:00:00</comment_date></row><row _id="row-vhst~2vtq~fxtt" _uuid="00000000-0000-0000-4857-83B86E623EA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vhst~2vtq~fxtt"><intent_id>918835</intent_id><project_id>854358</project_id><text_data>Change out lighting fixtures, heaters, stats, exhaust fans, etc. Apartment complex and four-plex.  No more than 4 levels. Residential permanent housing.  All units have kitchen and bath.  All other answers are no.</text_data><comment_date>2018-07-18T00:00:00</comment_date></row><row _id="row-kmyb.s39g-prd5" _uuid="00000000-0000-0000-8F55-91D6951756DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kmyb.s39g-prd5"><intent_id>1125424</intent_id><project_id>952396</project_id><text_data>Fringes: Vacation $4.00, Assessment $1.30, Insurance $9.01, Pension $14.55, Training $2.08, Industry Improvement $.50</text_data><comment_date>2021-02-28T00:00:00</comment_date></row><row _id="row-avn6-yqcf.vhrg" _uuid="00000000-0000-0000-5780-8ABB8B4D1389" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-avn6-yqcf.vhrg"><intent_id>632857</intent_id><project_id>735964</project_id><text_data>Cash Fringe</text_data><comment_date>2014-06-03T00:00:00</comment_date></row><row _id="row-m8gw_em2k~9hwv" _uuid="00000000-0000-0000-054A-716A5B9C0317" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8gw_em2k~9hwv"><intent_id>938525</intent_id><project_id>852027</project_id><text_data>We hired Speer Taps as a sub-tier contractor. HD Fowler did not perform any work at all.</text_data><comment_date>2018-10-09T00:00:00</comment_date></row><row _id="row-7zm3.64mt_nprh" _uuid="00000000-0000-0000-FC89-0653E7585263" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zm3.64mt_nprh"><intent_id>729286</intent_id><project_id>762353</project_id><text_data>Maribel Gutierrez1500 S 14StYakima, WA 98901509.901.0280</text_data><comment_date>2015-10-31T00:00:00</comment_date></row><row _id="row-akep.yc9x-gy7c" _uuid="00000000-0000-0000-3804-7245D20D89C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-akep.yc9x-gy7c"><intent_id>1054353</intent_id><project_id>917224</project_id><text_data>SRO 1908402</text_data><comment_date>2020-04-28T00:00:00</comment_date></row><row _id="row-hwzp.knzu_jprt" _uuid="00000000-0000-0000-E75A-5C8E5C83E60B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hwzp.knzu_jprt"><intent_id>918042</intent_id><project_id>855930</project_id><text_data>This is a riparian restoration project. The goal is to establish plants, trees, and shrubs on a plot of ground in the vicinity of water (creek, river, pond, or lake) that has been taken over by non-native species. Our specific job on this project is mowing. The purpose is to clear or eliminate competing non-native plants (blackberries, canary grass, etc.) in order to assure the survival of native plants already planted (plant maintenance). Our workers use a hand held power trimmer and/or walk behind power mower, and also spot spray herbicide directly to invasive plants, using a hand held wand attached to a small backpack tank, under the direct supervision of a licensed applicator.</text_data><comment_date>2018-07-13T00:00:00</comment_date></row><row _id="row-emr9-c6ph~s8ze" _uuid="00000000-0000-0000-59B3-2220D1518CB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-emr9-c6ph~s8ze"><intent_id>712592</intent_id><project_id>750305</project_id><text_data>Install irrigation system to a maximum depth of 3� below finished grade. Trench for irrigation system to a maximum depth of 3� below finished grade.  Install plants, trees, shrubs.  Spread topsoil, mulch or bark to plant beds.  Equipment to be used, bobcat under 75hp and misc. small hand tools.</text_data><comment_date>2015-08-06T00:00:00</comment_date></row><row _id="row-xdkb-899p~mw9z" _uuid="00000000-0000-0000-F61E-833F78AFC378" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdkb-899p~mw9z"><intent_id>503791</intent_id><project_id>684157</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2012-03-14T00:00:00</comment_date></row><row _id="row-hd7p-wm4n-fjgg" _uuid="00000000-0000-0000-908A-29F71245BFE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hd7p-wm4n-fjgg"><intent_id>596888</intent_id><project_id>720316</project_id><text_data>Filed by Jaime Hernandez</text_data><comment_date>2013-10-01T00:00:00</comment_date></row><row _id="row-bmpn.c8un-esbz" _uuid="00000000-0000-0000-3FFF-B70B6E1598C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmpn.c8un-esbz"><intent_id>1111819</intent_id><project_id>910695</project_id><text_data>Journeyman Class 4 Fringe Package = Ind Acct Pension ($10.00) / Pension ($5.62) / Occ Health ($0.01) / Health ($9.24) / Apprenticeship ($1.00) / Industry Fund ($0.10) / LMCT ($0.05) / Int�l Trng Fund ($0.10) / Vacation ($1.94) = $28.06</text_data><comment_date>2020-12-23T00:00:00</comment_date></row><row _id="row-yqvz_nuet_wwxa" _uuid="00000000-0000-0000-25CC-120E00763D68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yqvz_nuet_wwxa"><intent_id>966694</intent_id><project_id>873405</project_id><text_data>3190022 - BIIA TI</text_data><comment_date>2019-03-21T00:00:00</comment_date></row><row _id="row-2f9e-h458~z8fr" _uuid="00000000-0000-0000-D627-3022725C035F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2f9e-h458~z8fr"><intent_id>528152</intent_id><project_id>692507</project_id><text_data>012051</text_data><comment_date>2012-08-13T00:00:00</comment_date></row><row _id="row-j5ys-7cq2~x6b4" _uuid="00000000-0000-0000-374F-C0EB3A5CF992" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j5ys-7cq2~x6b4"><intent_id>797300</intent_id><project_id>780876</project_id><text_data>1. Attic blow, belly blow, duct seal2. single family3.14. a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no5. yes6. yes7. noe. no</text_data><comment_date>2016-10-21T00:00:00</comment_date></row><row _id="row-jpfp~fy88_e4j9" _uuid="00000000-0000-0000-1FDF-F82D5899CDAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jpfp~fy88_e4j9"><intent_id>659753</intent_id><project_id>746386</project_id><text_data>Filed by Victor Servin.</text_data><comment_date>2014-10-10T00:00:00</comment_date></row><row _id="row-bzic-5s25-q2s3" _uuid="00000000-0000-0000-9BB9-842475897349" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bzic-5s25-q2s3"><intent_id>934314</intent_id><project_id>861417</project_id><text_data>105 West Washington Ave #38Yakima, WA 98903</text_data><comment_date>2018-09-20T00:00:00</comment_date></row><row _id="row-9mpb~4s5k-x96q" _uuid="00000000-0000-0000-0B84-1FCADDB7AB06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9mpb~4s5k-x96q"><intent_id>508198</intent_id><project_id>685293</project_id><text_data>Form filed by: Robert Janicki - murq235</text_data><comment_date>2012-04-17T00:00:00</comment_date></row><row _id="row-wugx~nu5d_prvb" _uuid="00000000-0000-0000-9DC4-AC8FE5F98F3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wugx~nu5d_prvb"><intent_id>705879</intent_id><project_id>766798</project_id><text_data>(A) Olympia Ave., Building #1620, Repair Broken 2&amp;quot; Gas Line (B) Crewtruck, Misc. Gas Tools And Labor To Repair Gas Line</text_data><comment_date>2015-07-09T00:00:00</comment_date></row><row _id="row-2vb8_3vge~ydh6" _uuid="00000000-0000-0000-A9FF-7CF1608269A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2vb8_3vge~ydh6"><intent_id>910453</intent_id><project_id>853072</project_id><text_data>Refinishing gymnasium floors.</text_data><comment_date>2019-07-11T00:00:00</comment_date></row><row _id="row-hm8n-d3su-757h" _uuid="00000000-0000-0000-BCB3-A2BA20B1BE88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hm8n-d3su-757h"><intent_id>1107611</intent_id><project_id>917673</project_id><text_data>Worker's Compensation Insurance Company Oregon SAIF Corp Policy #625739, Transferrable to Washington State.</text_data><comment_date>2020-12-04T00:00:00</comment_date></row><row _id="row-67n2~yj4h.jv97" _uuid="00000000-0000-0000-B0DE-1D0696970C66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-67n2~yj4h.jv97"><intent_id>572873</intent_id><project_id>711219</project_id><text_data>The Dept of L&amp;I has been paid,and the additional penalties and interest have been paid this morning by Check #: 32904 which has been mailed this morning to PO Box in Seattle per Nikki @ Customer Service.</text_data><comment_date>2013-06-17T00:00:00</comment_date></row><row _id="row-z33a~i75a_wt94" _uuid="00000000-0000-0000-A031-1DAE7310C461" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z33a~i75a_wt94"><intent_id>790395</intent_id><project_id>802874</project_id><text_data>PC6 - 901-06Invoice #3050412CE</text_data><comment_date>2016-09-20T00:00:00</comment_date></row><row _id="row-qaiw_equ8~y6mu" _uuid="00000000-0000-0000-7693-5DC615A9AABB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qaiw_equ8~y6mu"><intent_id>524320</intent_id><project_id>690550</project_id><text_data>we will be paying union wages  - wage of $34.75 and fringe of $15.15  - 2 workers</text_data><comment_date>2012-07-25T00:00:00</comment_date></row><row _id="row-cmnc_7wcx-akgy" _uuid="00000000-0000-0000-7DD4-71E9A0633EAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cmnc_7wcx-akgy"><intent_id>631811</intent_id><project_id>735843</project_id><text_data>The correct contract for Intent 631811 is 341118 per Mark Duarte</text_data><comment_date>2014-06-12T00:00:00</comment_date></row><row _id="row-4n46~7wcg.ziga" _uuid="00000000-0000-0000-A131-67D09BBFA174" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4n46~7wcg.ziga"><intent_id>887000</intent_id><project_id>806726</project_id><text_data>Filed by Gerald Burke</text_data><comment_date>2018-02-07T00:00:00</comment_date></row><row _id="row-m6ii~7vbz~zuqw" _uuid="00000000-0000-0000-46FE-9A0CF2652EE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6ii~7vbz~zuqw"><intent_id>1234026</intent_id><project_id>1013553</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION22-90-167</text_data><comment_date>2022-05-17T00:00:00</comment_date></row><row _id="row-9k7e-e9e4.bej8" _uuid="00000000-0000-0000-D31C-C24D0A18A48F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9k7e-e9e4.bej8"><intent_id>714184</intent_id><project_id>772566</project_id><text_data>Filed by Kim E. Nelson</text_data><comment_date>2015-08-13T00:00:00</comment_date></row><row _id="row-p22s~z7y7.zfy5" _uuid="00000000-0000-0000-3298-0F7FD3048A91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p22s~z7y7.zfy5"><intent_id>658499</intent_id><project_id>735810</project_id><text_data>Form filed by: Neil Provenzano</text_data><comment_date>2014-10-03T00:00:00</comment_date></row><row _id="row-4bcw.zcx2~uau9" _uuid="00000000-0000-0000-EEE8-D4CB9A1EFC5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4bcw.zcx2~uau9"><intent_id>1207532</intent_id><project_id>997146</project_id><text_data>9887192</text_data><comment_date>2022-01-27T00:00:00</comment_date></row><row _id="row-kxuq.88zz-64jb" _uuid="00000000-0000-0000-29C1-C32340ACF86E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kxuq.88zz-64jb"><intent_id>645913</intent_id><project_id>741068</project_id><text_data>INV# 1093543</text_data><comment_date>2014-08-05T00:00:00</comment_date></row><row _id="row-heyu~8dm2.89dx" _uuid="00000000-0000-0000-976E-111042417B4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-heyu~8dm2.89dx"><intent_id>1209599</intent_id><project_id>972846</project_id><comment_date>2022-02-07T00:00:00</comment_date></row><row _id="row-bf5y.23s6_t7eq" _uuid="00000000-0000-0000-CC55-B58AC29EA382" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bf5y.23s6_t7eq"><intent_id>1163328</intent_id><project_id>973861</project_id><comment_date>2021-10-19T00:00:00</comment_date></row><row _id="row-g967_kf2k-s528" _uuid="00000000-0000-0000-1944-5371E187640F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g967_kf2k-s528"><intent_id>935781</intent_id><project_id>862516</project_id><text_data>Planting and mulching</text_data><comment_date>2018-09-26T00:00:00</comment_date></row><row _id="row-wtaf.f2v3-irvj" _uuid="00000000-0000-0000-20F5-B35793FC7E48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wtaf.f2v3-irvj"><intent_id>698330</intent_id><project_id>732764</project_id><text_data>Form filed by:  W.L. Seelye</text_data><comment_date>2015-06-03T00:00:00</comment_date></row><row _id="row-ttpy.jw2s.9z7p" _uuid="00000000-0000-0000-11A6-290A39D91C67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ttpy.jw2s.9z7p"><intent_id>1125153</intent_id><project_id>952247</project_id><text_data>S030639</text_data><comment_date>2021-02-26T00:00:00</comment_date></row><row _id="row-jhu5~d4pz_hpkw" _uuid="00000000-0000-0000-6AEA-7DBD24A4BCA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jhu5~d4pz_hpkw"><intent_id>1238432</intent_id><project_id>1016015</project_id><text_data>Haz Waste workers to clean and disinfect area using rags/sponges/mops</text_data><comment_date>2022-06-03T00:00:00</comment_date></row><row _id="row-dfui.bm94.jtg8" _uuid="00000000-0000-0000-D8A7-B585E168C120" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfui.bm94.jtg8"><intent_id>705481</intent_id><project_id>760502</project_id><text_data>James Baldwin</text_data><comment_date>2015-07-06T00:00:00</comment_date></row><row _id="row-b8j7~qnt6~2cg5" _uuid="00000000-0000-0000-B0D8-0527629282B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b8j7~qnt6~2cg5"><intent_id>859227</intent_id><project_id>830185</project_id><text_data>other truck water truck- other truck lowboy</text_data><comment_date>2017-08-29T00:00:00</comment_date></row><row _id="row-zms2-8mmu.ttae" _uuid="00000000-0000-0000-ADCD-9A7A3B655CA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zms2-8mmu.ttae"><intent_id>741966</intent_id><project_id>782854</project_id><text_data>Job # 8009160</text_data><comment_date>2016-01-15T00:00:00</comment_date></row><row _id="row-aczc_vpdh_dqex" _uuid="00000000-0000-0000-712B-715938E31A8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aczc_vpdh_dqex"><intent_id>1130851</intent_id><project_id>950611</project_id><text_data>In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions and resubmit your form:#1 - Describe the work that your firm was contracted to perform.  Bath Fan Replacement#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single#3 - Including any basement or garage, how many stories or levels does the structure have?1#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure?no(b) Any retail use in the structure?no(c) Permanent residence only?yes(d) Rehabilitation house?no(e) Transitional housing?no(f) Communal dining facility?no(g) Treatment services?no(h) Assisted living services?no(i) Dormitories?no(j) Counseling?no(k) Is each room and/or bed in the structure rented separately?no(l) Other services or uses?#5 - Does each dwelling unit have its own self-contained kitchen?yes#6 - Does each dwelling unit have its own bathroom?yes#7 - Is there a community facility or manager�s office on site?no#8 - Is any part of the structure used by members of the public?no</text_data><comment_date>2021-04-04T00:00:00</comment_date></row><row _id="row-r9de-ktzf-vs4m" _uuid="00000000-0000-0000-F4F4-83B6D7C14640" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9de-ktzf-vs4m"><intent_id>845536</intent_id><project_id>826347</project_id><text_data>Motor Patrol Grader to vacuum area for new power pole</text_data><comment_date>2017-07-06T00:00:00</comment_date></row><row _id="row-3ima-ngp4_ug5z" _uuid="00000000-0000-0000-3EF7-A2557FC6123D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ima-ngp4_ug5z"><intent_id>939854</intent_id><project_id>852446</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2018-10-15T00:00:00</comment_date></row><row _id="row-it89-yzkt~iuqt" _uuid="00000000-0000-0000-CCA5-F42FCD135C15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-it89-yzkt~iuqt"><intent_id>812642</intent_id><project_id>811930</project_id><text_data>Job #109314-001</text_data><comment_date>2017-01-25T00:00:00</comment_date></row><row _id="row-tyce~ujxz_ig3u" _uuid="00000000-0000-0000-0C36-C749A6AC4560" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tyce~ujxz_ig3u"><intent_id>516966</intent_id><project_id>689625</project_id><text_data>Lanscape contruction included spreading of seed and hay/straw</text_data><comment_date>2012-06-14T00:00:00</comment_date></row><row _id="row-fhb8.c7y9_zbhe" _uuid="00000000-0000-0000-744E-1039F1A3EF42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fhb8.c7y9_zbhe"><intent_id>767840</intent_id><project_id>763343</project_id><text_data>We will provide and labor &amp; equipment to install an irrigation system, landscaping, and hydroseeding. We will trench, using a hand-trencher to 8-10 inches deep to lay irrigation pipe and sprinklers. We will backfill ditches and rake by hand.We will dig and plant plant materials and prep ground for both sod and hydroseeding of playfields.</text_data><comment_date>2016-06-13T00:00:00</comment_date></row><row _id="row-5aif_x72w-639g" _uuid="00000000-0000-0000-179C-CB2FC56DF72B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5aif_x72w-639g"><intent_id>671496</intent_id><project_id>751542</project_id><text_data>Single Family Dwelling</text_data><comment_date>2014-12-29T00:00:00</comment_date></row><row _id="row-gim8.3xzk_wtr4" _uuid="00000000-0000-0000-7161-89934C2C5AC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gim8.3xzk_wtr4"><intent_id>1243420</intent_id><project_id>1004663</project_id><text_data>Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2022-06-23T00:00:00</comment_date></row><row _id="row-a8pf~mi38-k54u" _uuid="00000000-0000-0000-243F-B7DF31F1BBAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a8pf~mi38-k54u"><intent_id>594856</intent_id><project_id>712857</project_id><text_data>Complete voice and data communication cabling system. Provide, install, terminate, and test cables; provide backbone cablng nad equipment room buildout.</text_data><comment_date>2013-09-19T00:00:00</comment_date></row><row _id="row-wnue-bzau_eyff" _uuid="00000000-0000-0000-15FE-2F041E38867D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wnue-bzau_eyff"><intent_id>952196</intent_id><project_id>869357</project_id><text_data>Repair # 627830Inv 6000344121Eve</text_data><comment_date>2018-12-26T00:00:00</comment_date></row><row _id="row-e8zs.s78b_ptm9" _uuid="00000000-0000-0000-A9AD-6B927AD76E25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e8zs.s78b_ptm9"><intent_id>674991</intent_id><project_id>753792</project_id><text_data>Job # 100368-001</text_data><comment_date>2015-01-16T00:00:00</comment_date></row><row _id="row-j3z2_zj54~yvwc" _uuid="00000000-0000-0000-EC46-A4FF69A5EBB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j3z2_zj54~yvwc"><intent_id>476030</intent_id><project_id>673702</project_id><text_data>Centennial Contactors Enterprises JOC Contract</text_data><comment_date>2011-09-02T00:00:00</comment_date></row><row _id="row-ih7g.m9vu_mi85" _uuid="00000000-0000-0000-CDC9-877C86B65D5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ih7g.m9vu_mi85"><intent_id>948508</intent_id><project_id>867708</project_id><text_data>000183-134-00</text_data><comment_date>2018-11-30T00:00:00</comment_date></row><row _id="row-udus~8c2t.3vu8" _uuid="00000000-0000-0000-9F85-DBECEC2C8A5B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-udus~8c2t.3vu8"><intent_id>862968</intent_id><project_id>832686</project_id><text_data>Job Order Contract (JOC)  Construction Services for Capital ProjectsContract No. RTA/CN 0165-15Work Order No.  004 - CCE 73490-0009</text_data><comment_date>2017-09-14T00:00:00</comment_date></row><row _id="row-2h6t-gnqw-w35j" _uuid="00000000-0000-0000-63ED-4F722A7D4DA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2h6t-gnqw-w35j"><intent_id>1095971</intent_id><project_id>878466</project_id><text_data>Teamster Truck Drivers Asphalt Mix over 16 Yards: Class 1 												$43.63 Per Hour Fringes												$20.92Health and Security 							$10.78Pension 												$9.44Apprenticeship									$0.70DeductionsNE Fair Contracting Committee		$0.20Power Equipment Operators Spreader, Topsider &amp; Screedman:Group 1 												$51.02 Per HourFringes 												$22.47 Health and Security 							$8.57Pension 												$13.15Apprenticeship Training/Retraining 	$0.70National Training									$0.05DeductionsGross Wage										x 2% Union Programs								$0.30Political Programs							$0.05Power Equipment Operators Roller, Plant Mix Or Multi-lift Materials:Group 3 												$49.81 Per HourFringes 												$22.47Health and Security 							$8.57Pension 												$13.15Apprenticeship Training/Retraining 	$0.70National Training									$0.05DeductionsGross Wage										x 2%Union Programs								$0.30Political Programs							$0.05Laborers Raker - Asphalt:Group 5												$41.43 Per HourFringes												$12.58 Health and Welfare 							$6.70Pension 												$4.79Training												$0.95NWLECET											$0.14DeductionsCredit Union										$1.05Dues													$1.65</text_data><comment_date>2021-01-20T00:00:00</comment_date></row><row _id="row-rtxw_3d7n.kwaw" _uuid="00000000-0000-0000-7998-C9CCAAF3C064" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rtxw_3d7n.kwaw"><intent_id>637256</intent_id><project_id>737914</project_id><text_data>job# S023199</text_data><comment_date>2014-06-25T00:00:00</comment_date></row><row _id="row-egik.vgnx.xpjt" _uuid="00000000-0000-0000-A47C-50136CCB499F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-egik.vgnx.xpjt"><intent_id>1076071</intent_id><project_id>927210</project_id><text_data>Work performed by the Telecommunication Technicians is installing Category 6 cabling for voice and data indoors. POWERCOM JOB# 925805</text_data><comment_date>2020-07-29T00:00:00</comment_date></row><row _id="row-wxkb_eeic_gw9v" _uuid="00000000-0000-0000-BD9F-4745547DC1AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wxkb_eeic_gw9v"><intent_id>1243754</intent_id><project_id>1006519</project_id><text_data>This project is the construction of a new High School in Tacoma. Our work includes the preparation of soil for plantings, seed and sod. We will install an underground sprinkler system at depth of less than 3 feet. We will trench by hand using shovels and with a mini excavator that is under 90 hp to a depth of 12' to 18'. We will install PVC pipe and sprinkler heads and backfill the trench with 3' of sand using a backhoe that is under 90 hp. Landscaping work will include placing 8' of planting soil and planting of trees, shrubs and ground cover by hand and with assistance of the mini excavator and backhoe, both under 90 hp.</text_data><comment_date>2022-06-23T00:00:00</comment_date></row><row _id="row-fzzw~pq3e-3at4" _uuid="00000000-0000-0000-AF6B-7213AEBC0424" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fzzw~pq3e-3at4"><intent_id>762763</intent_id><project_id>756429</project_id><text_data>Filed by Geraldo Rameriz/Concepcion Solis</text_data><comment_date>2016-05-18T00:00:00</comment_date></row><row _id="row-vgpm-9qt8.2a3u" _uuid="00000000-0000-0000-42BB-D6837777E73F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vgpm-9qt8.2a3u"><intent_id>880647</intent_id><project_id>840133</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-12-22T00:00:00</comment_date></row><row _id="row-ei3j_a3gv~tqeb" _uuid="00000000-0000-0000-50E8-A39358EB75F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ei3j_a3gv~tqeb"><intent_id>532014</intent_id><project_id>695094</project_id><text_data>OTHER TRUCKS; WATER TRUCKS 4000 GALLONS AND UNDER, USED FOR DUST CONTROL</text_data><comment_date>2012-08-31T00:00:00</comment_date></row><row _id="row-ea73.96pt_pa5d" _uuid="00000000-0000-0000-FACF-17F309D75D48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ea73.96pt_pa5d"><intent_id>1023110</intent_id><project_id>900177</project_id><text_data>This work will require our lift crane and operator, faller/bucker/chainsaw owner operator Patrick Haley, 1 brush hog feeder and stump grinder.</text_data><comment_date>2019-11-21T00:00:00</comment_date></row><row _id="row-4y77~tdwr_zmaz" _uuid="00000000-0000-0000-6C4F-7C4B638ED352" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4y77~tdwr_zmaz"><intent_id>496990</intent_id><project_id>665433</project_id><text_data>S32008 JD/JL</text_data><comment_date>2012-01-13T00:00:00</comment_date></row><row _id="row-34t8_c7ia-idzg" _uuid="00000000-0000-0000-1C58-D992C24D0461" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-34t8_c7ia-idzg"><intent_id>698546</intent_id><project_id>663660</project_id><text_data>Form filed by:  Eric Tan</text_data><comment_date>2015-06-04T00:00:00</comment_date></row><row _id="row-yahi.mwck~gwwe" _uuid="00000000-0000-0000-CB7C-F97DD7708585" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yahi.mwck~gwwe"><intent_id>854289</intent_id><project_id>829351</project_id><text_data>Job #400429</text_data><comment_date>2017-08-11T00:00:00</comment_date></row><row _id="row-2dv4_f5f6~gys6" _uuid="00000000-0000-0000-7118-DC281B11F374" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2dv4_f5f6~gys6"><intent_id>880052</intent_id><project_id>839823</project_id><text_data>Manual control of weeds. Hand work or hand held small engine (weed eater) only.</text_data><comment_date>2017-12-19T00:00:00</comment_date></row><row _id="row-g3d7_zpx6_juks" _uuid="00000000-0000-0000-8CD6-A9B0AD95E5DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g3d7_zpx6_juks"><intent_id>724660</intent_id><project_id>769763</project_id><text_data>Provide backfill labor, irrigation and sod repair, and new irrigation installation.</text_data><comment_date>2015-10-06T00:00:00</comment_date></row><row _id="row-eqvx~sjgd-ng2b" _uuid="00000000-0000-0000-2419-A81D50B19B3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eqvx~sjgd-ng2b"><intent_id>1388327</intent_id><project_id>1101447</project_id><text_data>J#501613018</text_data><comment_date>2023-12-15T00:00:00</comment_date></row><row _id="row-p4gk-zaut~gkqz" _uuid="00000000-0000-0000-D134-812F846825E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4gk-zaut~gkqz"><intent_id>1135861</intent_id><project_id>958191</project_id><text_data>1.- General weatherization/ Wall insulation2.- Single home3.- 2 levels4.- a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-no.5.- yes6.- yes7.-no 8.- no</text_data><comment_date>2021-04-14T00:00:00</comment_date></row><row _id="row-ps8x-ncni-6wgn" _uuid="00000000-0000-0000-3526-2DDCF37BA7F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ps8x-ncni-6wgn"><intent_id>1386952</intent_id><project_id>1099308</project_id><comment_date>2023-12-11T00:00:00</comment_date></row><row _id="row-kjn4_amfv-44zq" _uuid="00000000-0000-0000-63A4-D0E48084AD6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kjn4_amfv-44zq"><intent_id>757361</intent_id><project_id>789894</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2016-04-19T00:00:00</comment_date></row><row _id="row-gpv4_8rbk_nr7z" _uuid="00000000-0000-0000-32E1-5119C2195F9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gpv4_8rbk_nr7z"><intent_id>884778</intent_id><project_id>839258</project_id><text_data>Source Electric LLC is a signatory contractor to IBEW Local 46. A breakdown of the hourly qualified fringe benefits is as followed; Health and Welfare ($8.75), Pension ($7.88), 401k ($2.00), JATC apprenticeship training ($0.68), NEBF National Electrical Benefit Fund ($1.43).</text_data><comment_date>2018-01-23T00:00:00</comment_date></row><row _id="row-hf23~w5b8.fwig" _uuid="00000000-0000-0000-BBA5-0C0CD90C2DAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hf23~w5b8.fwig"><intent_id>489493</intent_id><project_id>678339</project_id><text_data>1) yes2) 2 stories3) a)yes   b)no   c)no   d)no   e)no   f)no   g)no4) yes5) yes6) yes7) no</text_data><comment_date>2011-11-21T00:00:00</comment_date></row><row _id="row-2nkq~7bis_sj5h" _uuid="00000000-0000-0000-49D0-3ADDD2B1F9BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2nkq~7bis_sj5h"><intent_id>744719</intent_id><project_id>784173</project_id><text_data>Contract #20133 from 2/1/2016 thru 1/31/2017</text_data><comment_date>2016-02-03T00:00:00</comment_date></row><row _id="row-eagb-7b2n.3qey" _uuid="00000000-0000-0000-E397-BD32533D97B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eagb-7b2n.3qey"><intent_id>604948</intent_id><project_id>724082</project_id><text_data>Filed by Theresa Hilburn</text_data><comment_date>2013-11-18T00:00:00</comment_date></row><row _id="row-zsvr-ty9e_jqxy" _uuid="00000000-0000-0000-4F78-9565D5AE1387" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zsvr-ty9e_jqxy"><intent_id>1038337</intent_id><project_id>908399</project_id><comment_date>2020-02-13T00:00:00</comment_date></row><row _id="row-bvp9_n2jd.juwn" _uuid="00000000-0000-0000-BFF1-4E6A5EC1ED2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bvp9_n2jd.juwn"><intent_id>900832</intent_id><project_id>846948</project_id><text_data>302733</text_data><comment_date>2018-04-25T00:00:00</comment_date></row><row _id="row-ie2z-tn5b_7mrr" _uuid="00000000-0000-0000-3A49-41090F66E374" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ie2z-tn5b_7mrr"><intent_id>1266918</intent_id><project_id>1031232</project_id><text_data>9897239</text_data><comment_date>2022-09-15T00:00:00</comment_date></row><row _id="row-wjyk~wzg8.2tc2" _uuid="00000000-0000-0000-2DF2-3EEB450CA035" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wjyk~wzg8.2tc2"><intent_id>609864</intent_id><project_id>721048</project_id><text_data>HIRED BY TITAN EARTHWORK LLC</text_data><comment_date>2013-12-26T00:00:00</comment_date></row><row _id="row-uag4~ije4.zu8c" _uuid="00000000-0000-0000-0C6F-1228A7ABC7DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uag4~ije4.zu8c"><intent_id>1192650</intent_id><project_id>987662</project_id><text_data>We will be removing invasive species from above OHWM using small hand held brush cutters. The area receiving removal focus will then be planted with native shrubs and trees. All work will be done with small machines and hand operated shovels and pulaskis. Hand held tools include brushcutters, hedgetrimmers, shovels, pick axes, pulsaskis and McClouds.</text_data><comment_date>2021-12-01T00:00:00</comment_date></row><row _id="row-qwxb.zfcg-5ufj" _uuid="00000000-0000-0000-C6FF-6EAF24D6A73B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qwxb.zfcg-5ufj"><intent_id>450270</intent_id><project_id>663829</project_id><text_data>#1321Email Id numbers to: carlab@regencynw.com</text_data><comment_date>2011-04-07T00:00:00</comment_date></row><row _id="row-yv8j-8tvd_279j" _uuid="00000000-0000-0000-136C-A3D8BDB44361" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yv8j-8tvd_279j"><intent_id>1238047</intent_id><project_id>978333</project_id><text_data>JCI Project # 621642102 Glenwood DAS - Cheryl Graves, PC - Lyle Fortin, Sales</text_data><comment_date>2022-06-02T00:00:00</comment_date></row><row _id="row-sfva~nhay-r8dg" _uuid="00000000-0000-0000-6987-D230B8280BA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sfva~nhay-r8dg"><intent_id>1124618</intent_id><project_id>951878</project_id><comment_date>2021-03-10T00:00:00</comment_date></row><row _id="row-c5as~rxpc~6ixu" _uuid="00000000-0000-0000-20D7-3B696E3C2C13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c5as~rxpc~6ixu"><intent_id>1050719</intent_id><project_id>911157</project_id><text_data>***SELF-INSURED***GENERAL LABORER: Performs work of shoveling with a hand shovel, cleaning/sweeping with a hand broom, heating joints using a Flamo, tacking using a tack bucket and hand broom.OTHER TRUCKS:  A Low Boy trailer used for deliver and pick up of equipment. A 2018 Kenworth Oil Distributor Truck, 2,000 Gallon</text_data><comment_date>2020-04-10T00:00:00</comment_date></row><row _id="row-jjr7.shyh-crrs" _uuid="00000000-0000-0000-82AA-7BF0A7FA3552" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jjr7.shyh-crrs"><intent_id>498690</intent_id><project_id>682055</project_id><text_data>Vactor Truck, Single tractor with tank mount and pump accessories to flush sewer line.</text_data><comment_date>2012-01-31T00:00:00</comment_date></row><row _id="row-7y4q.srv8~iidd" _uuid="00000000-0000-0000-3A9B-E67BFB8AAC15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7y4q.srv8~iidd"><intent_id>1219160</intent_id><project_id>1004474</project_id><text_data>64943-2</text_data><comment_date>2022-03-18T00:00:00</comment_date></row><row _id="row-6su3-ht3u~kg3i" _uuid="00000000-0000-0000-D6CB-4ECEC1FC450A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6su3-ht3u~kg3i"><intent_id>526528</intent_id><project_id>693134</project_id><text_data>Industrial Insurance acct #893,640-02</text_data><comment_date>2012-08-07T00:00:00</comment_date></row><row _id="row-rxh3-xmjx.4j67" _uuid="00000000-0000-0000-842A-A837C871D8D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rxh3-xmjx.4j67"><intent_id>816853</intent_id><project_id>813840</project_id><text_data>this intent to replace first intent  763093 with corrections</text_data><comment_date>2017-02-20T00:00:00</comment_date></row><row _id="row-ypnz_uk5m-nr5z" _uuid="00000000-0000-0000-50F9-0E07C26A810C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ypnz_uk5m-nr5z"><intent_id>849174</intent_id><project_id>825977</project_id><text_data>Irrigation installation. Sod removal and installation.</text_data><comment_date>2017-07-21T00:00:00</comment_date></row><row _id="row-knjn~upgw_py26" _uuid="00000000-0000-0000-DA4A-3512A915A322" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knjn~upgw_py26"><intent_id>838122</intent_id><project_id>823419</project_id><text_data>This intent replaces intent id 830170</text_data><comment_date>2017-06-05T00:00:00</comment_date></row><row _id="row-hgpj~vakm~if9v" _uuid="00000000-0000-0000-C040-1DDF6EEE246D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hgpj~vakm~if9v"><intent_id>863980</intent_id><project_id>833055</project_id><text_data>Ref Invoice #90967, Holmberg Service Job# JK-17-017</text_data><comment_date>2017-09-20T00:00:00</comment_date></row><row _id="row-652s_gqwe.8644" _uuid="00000000-0000-0000-6DFD-15B6CC9B17C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-652s_gqwe.8644"><intent_id>696778</intent_id><project_id>741762</project_id><text_data>a)the entire portion of the project is to replace the roof on reservoir 6.b)our scope of the project is to install hydroseed per specifications, on designated and prepared area - using a hydroseed installation truck. hydroseed is a one-step process.</text_data><comment_date>2015-05-27T00:00:00</comment_date></row><row _id="row-y2h9-xwww-49mh" _uuid="00000000-0000-0000-64E8-53B9FCF96C50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y2h9-xwww-49mh"><intent_id>533542</intent_id><project_id>693817</project_id><text_data>Fringe - Hourly Pension $18.53 - Hourly Vacation $9.27 - Hourly Holiday $3.09</text_data><comment_date>2012-09-10T00:00:00</comment_date></row><row _id="row-r2ag_wrfe~q5fv" _uuid="00000000-0000-0000-E38A-309A371D42A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r2ag_wrfe~q5fv"><intent_id>1207380</intent_id><project_id>978613</project_id><comment_date>2022-01-27T00:00:00</comment_date></row><row _id="row-inet_tk6a~y4v7" _uuid="00000000-0000-0000-782A-8EDBB221A770" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inet_tk6a~y4v7"><intent_id>980266</intent_id><project_id>818636</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborers Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2019-05-24T00:00:00</comment_date></row><row _id="row-a2kt-vgbj_2ute" _uuid="00000000-0000-0000-3F4A-80940787BCFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a2kt-vgbj_2ute"><intent_id>535874</intent_id><project_id>696444</project_id><text_data>***This will replace intent 528940, we made an error on the awarding agency.Sports field drainage installation project; Slit-drainage is to drain standing water, ie: rain, irrigation. A trench that is consistently less than 2 feet is cut/dug and drain pipe is installed, then the trench is filled.</text_data><comment_date>2012-09-21T00:00:00</comment_date></row><row _id="row-8xa9.vuwq-dct4" _uuid="00000000-0000-0000-539E-73C350D36755" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8xa9.vuwq-dct4"><intent_id>1221586</intent_id><project_id>1005976</project_id><text_data>? Provide labor and materials to install (60) each new category 6 cables from the proposedlocations to the LAN room.? Terminate on new ivory wall plates and black category 6 jacks at the station end.? Terminate on new 24 port patch panels on the LAN room end.? Provide and install 1U horizontal wire managers and blanking panels as needed.? Provide black cable sock for all exposed cabling on each end.? Provide all applicable permits.? Label and test new cables.</text_data><comment_date>2022-03-29T00:00:00</comment_date></row><row _id="row-2us3~knxd~nhqd" _uuid="00000000-0000-0000-9E1A-CFD691971509" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2us3~knxd~nhqd"><intent_id>657340</intent_id><project_id>737198</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2014-09-29T00:00:00</comment_date></row><row _id="row-nf7h~qshp~nxnc" _uuid="00000000-0000-0000-8D95-6AB0BFD7B12B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nf7h~qshp~nxnc"><intent_id>455001</intent_id><project_id>665363</project_id><text_data>Installing, trenching, backfilling Underground sprinkler system to maximum depth of 2 feet.</text_data><comment_date>2011-05-10T00:00:00</comment_date></row><row _id="row-dsti.hczw.54wh" _uuid="00000000-0000-0000-DE3C-B53B5B0D2BC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dsti.hczw.54wh"><intent_id>888964</intent_id><project_id>844044</project_id><text_data>Job 510484.02</text_data><comment_date>2018-02-19T00:00:00</comment_date></row><row _id="row-ynqq.p574~kg66" _uuid="00000000-0000-0000-59D9-3F8BFD0A743B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ynqq.p574~kg66"><intent_id>1093045</intent_id><project_id>926337</project_id><text_data>Installation of Cat6 data for security camera locations in Student Stores</text_data><comment_date>2020-10-02T00:00:00</comment_date></row><row _id="row-dbf9-p6bn-wr2g" _uuid="00000000-0000-0000-17F0-CE7117105931" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dbf9-p6bn-wr2g"><intent_id>743131</intent_id><project_id>783393</project_id><text_data>Filed by Eric Peterson</text_data><comment_date>2016-01-22T00:00:00</comment_date></row><row _id="row-6s7t~v2u8~wxcg" _uuid="00000000-0000-0000-96BE-38649295837F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6s7t~v2u8~wxcg"><intent_id>967666</intent_id><project_id>823933</project_id><text_data>We choose the contract amount</text_data><comment_date>2019-03-28T00:00:00</comment_date></row><row _id="row-79jc_7khq-6ykd" _uuid="00000000-0000-0000-B1BF-4AAF52871BE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-79jc_7khq-6ykd"><intent_id>575654</intent_id><project_id>712235</project_id><text_data>TYPE: TANDUM AXLE WATHER TRUCKSIZE: 4000 GALLONS PURPOSE: TO TRANSPORT AND SPRAY HYDRO MULCH</text_data><comment_date>2013-06-20T00:00:00</comment_date></row><row _id="row-pdqn-m26e~z6ra" _uuid="00000000-0000-0000-B635-7508CDA996CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pdqn-m26e~z6ra"><intent_id>967994</intent_id><project_id>871366</project_id><text_data>Installing Bark, soil, compost, sod, and native trees, shrubs, and groundcovers.</text_data><comment_date>2019-03-27T00:00:00</comment_date></row><row _id="row-6vf4_cykz.npya" _uuid="00000000-0000-0000-E259-0503F322FF11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6vf4_cykz.npya"><intent_id>1118670</intent_id><project_id>948488</project_id><text_data>Furnace maintenance in 2 story single family home, - 4a) NO 4b) NO 4c) YES 4d) NO 4e) NO 4f) NO 4g) NO 4h) NO 4i) NO 4j) NO 4k) NO 5) NO 6) NO 7) NO</text_data><comment_date>2021-01-28T00:00:00</comment_date></row><row _id="row-rkk8~87n6.z3fk" _uuid="00000000-0000-0000-C9E7-1E5BBE836C07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rkk8~87n6.z3fk"><intent_id>565774</intent_id><project_id>709361</project_id><text_data>Fringe Breakdown:Driver:$16.47--$4.70 Medical, $.10 Life Insurance,$.75 Vacation,$.30 Holiday,$.14 Apprentice,$10.48 Pension</text_data><comment_date>2013-05-01T00:00:00</comment_date></row><row _id="row-qpb3_z3er_hxq9" _uuid="00000000-0000-0000-9B67-8343A506B3F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qpb3_z3er_hxq9"><intent_id>642141</intent_id><project_id>739263</project_id><text_data>Other Trucks - 0 to 8,000 gallon water truck used for dust conrol</text_data><comment_date>2014-07-19T00:00:00</comment_date></row><row _id="row-tivr_a5vv-3peb" _uuid="00000000-0000-0000-BB1B-6C53B18E96AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tivr_a5vv-3peb"><intent_id>559412</intent_id><project_id>703691</project_id><text_data>1.	What was the purpose of the project? Provide software programming of the Siemens DDC System2.	Does this project entail the remodeling or new construction of a facility? yes, but not by Siemens employees3.             If your firm is working upon a type of building system, what type of system is involved? HVAC/ Refrigeration control system. 4.	What specific tasks did your employees perform? Siemens� BAU Technicians perform their work strictly on laptop computers, both remotely and on-site during the commissioning process. While off-site the BAU Technicians create a computerized schematic of a particular buildings HVAC automations system. That system is used to control the systems functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly the BAU Technician trains the end-user about the automation system functionality again using a computer interface. Importantly, BAU Technicians do not use trade tools such as drills or wrenches. 5.	What if any tools did your employees use in the performance of those tasks? Laptop computer.6.	If your employee used no tools, did they engage in any other type of manual, hands on efforts in completing their tasks? No-none.7.             Yes we are hiring subcontractors</text_data><comment_date>2013-03-12T00:00:00</comment_date></row><row _id="row-2dpq-uxtr-gad3" _uuid="00000000-0000-0000-ED44-5B715317B809" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2dpq-uxtr-gad3"><intent_id>720108</intent_id><project_id>772142</project_id><text_data>#1 - Exterior Painting &amp; Lighting Improvements#2 - Apartment#3 - Four#4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No#5 - Yes#6 - Yes#7 - Don&amp;#39;t know#8 - No</text_data><comment_date>2015-09-14T00:00:00</comment_date></row><row _id="row-weda~82v6.cum3" _uuid="00000000-0000-0000-AF33-5BAD7E05C542" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-weda~82v6.cum3"><intent_id>1068930</intent_id><project_id>857594</project_id><text_data>WO# 100223</text_data><comment_date>2020-06-30T00:00:00</comment_date></row><row _id="row-qr7b_5v94-xpjg" _uuid="00000000-0000-0000-8428-5BE6959BBE1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qr7b_5v94-xpjg"><intent_id>871807</intent_id><project_id>836200</project_id><text_data>subcontractor 603473-251-1-1</text_data><comment_date>2017-10-27T00:00:00</comment_date></row><row _id="row-3drj~pups-85rh" _uuid="00000000-0000-0000-B606-AC3C522E2925" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3drj~pups-85rh"><intent_id>1263906</intent_id><project_id>1029539</project_id><text_data>INV # 89054485 SR # 52745664</text_data><comment_date>2022-09-02T00:00:00</comment_date></row><row _id="row-fbti_fdqe_ev43" _uuid="00000000-0000-0000-8658-3C2B122D8C7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fbti_fdqe_ev43"><intent_id>612732</intent_id><project_id>726450</project_id><text_data>1-Install bath fan2-single family3-14-a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no5-yes6-yes7-no8-no</text_data><comment_date>2014-01-17T00:00:00</comment_date></row><row _id="row-z5ns~grgp.pu2t" _uuid="00000000-0000-0000-C5D1-11CAE2DF0784" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z5ns~grgp.pu2t"><intent_id>630896</intent_id><project_id>734510</project_id><text_data>Electricians � Inside:Health: $8.35Pension: $9.79Training: $0.68Total: $18.82 JOB 42438</text_data><comment_date>2014-05-21T00:00:00</comment_date></row><row _id="row-taj9~a4jg.e2xy" _uuid="00000000-0000-0000-4397-DD82F6CA4335" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-taj9~a4jg.e2xy"><intent_id>630919</intent_id><project_id>735466</project_id><text_data>Forester on site to provide all supplies, audit and check quality of work.</text_data><comment_date>2014-05-28T00:00:00</comment_date></row><row _id="row-39z5.dh7j.zbjq" _uuid="00000000-0000-0000-F3CF-F75CC00CB273" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39z5.dh7j.zbjq"><intent_id>885845</intent_id><project_id>842582</project_id><text_data>This is a single family mobile home.  There is no attached garage and no basement.  This home is used strictly for single family residential.  there is no commercial use.</text_data><comment_date>2018-01-30T00:00:00</comment_date></row><row _id="row-98r8_uz3b_shpz" _uuid="00000000-0000-0000-9820-41168E081123" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-98r8_uz3b_shpz"><intent_id>757146</intent_id><project_id>789800</project_id><text_data>other truck driver - transport equipment other truck driver - water truck</text_data><comment_date>2016-04-18T00:00:00</comment_date></row><row _id="row-a93n~wiha~42ex" _uuid="00000000-0000-0000-C00D-DB54618557E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a93n~wiha~42ex"><intent_id>725492</intent_id><project_id>766130</project_id><text_data>Filed by Jeffery J. Mansch</text_data><comment_date>2015-10-09T00:00:00</comment_date></row><row _id="row-jyzh~rt7h_cy4c" _uuid="00000000-0000-0000-804E-299A9D914097" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jyzh~rt7h_cy4c"><intent_id>1034039</intent_id><project_id>889721</project_id><text_data>Correct UBI 602418849</text_data><comment_date>2022-04-21T00:00:00</comment_date></row><row _id="row-j6hp-ifs6.d82q" _uuid="00000000-0000-0000-C516-12A4429E7BFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j6hp-ifs6.d82q"><intent_id>488845</intent_id><project_id>678068</project_id><text_data>$4.79 fringe  Pension: .30 Medical $2.83 Sick .21  Holiday  .56  Vacation .83  Birthday .07</text_data><comment_date>2011-11-11T00:00:00</comment_date></row><row _id="row-kapj~fq7r_tu8x" _uuid="00000000-0000-0000-6130-1C5CB28AD216" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kapj~fq7r_tu8x"><intent_id>1048770</intent_id><project_id>914296</project_id><text_data>Fringes:  Vacation $5.50, Assessment $1.30, Insurance $9.01, Pension $11.62, Training $2.33, Industry Improvement $.50</text_data><comment_date>2020-03-31T00:00:00</comment_date></row><row _id="row-szwj~scez~v78q" _uuid="00000000-0000-0000-F201-3FBC7EDD1A61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-szwj~scez~v78q"><intent_id>876714</intent_id><project_id>836555</project_id><text_data>We are paying the Davis Bacon Residential Wage of 30.66</text_data><comment_date>2017-11-30T00:00:00</comment_date></row><row _id="row-kfsm.siv9_u679" _uuid="00000000-0000-0000-BB01-ACF9A137CFC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kfsm.siv9_u679"><intent_id>528073</intent_id><project_id>689457</project_id><text_data>It appears your company may not be properly calculating worker fringe benefits. By separate email we are sending you a document that explains the benefits calculation process acceptable to the department. Please review that document and adjust your procedures as necessary. Approval of this form does not constitute approval of the methodology your company is using in determining the amount of such contributions. We reserve the right to investigate further the issue on this and future forms that your company submits on which the benefits calculation appears erroneous. If you have questions, please contact Marcus Ehrlander at (360) 902-5334 or marcus.ehrlander@Lni.wa.gov.</text_data><comment_date>2012-10-09T00:00:00</comment_date></row><row _id="row-g3g9~7suf-9kun" _uuid="00000000-0000-0000-44F1-CCD971F7598A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g3g9~7suf-9kun"><intent_id>863695</intent_id><project_id>786250</project_id><text_data>#1 - Describe the work that your firm was contracted to perform INSULATION #2 - Is the structure a single family dwelling YES, duplex NO, apartment YES, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have 2-3 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? YES #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2017-09-19T00:00:00</comment_date></row><row _id="row-zds7-5ic6_8zjr" _uuid="00000000-0000-0000-BDE9-0A7972795F8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zds7-5ic6_8zjr"><intent_id>1224047</intent_id><project_id>1007562</project_id><text_data>Provide LV labor as directed by UW staff</text_data><comment_date>2022-04-07T00:00:00</comment_date></row><row _id="row-7zwi_mhvd_c65d" _uuid="00000000-0000-0000-E9BF-1CB75F79F18F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zwi_mhvd_c65d"><intent_id>1110601</intent_id><project_id>943952</project_id><text_data>Haz Waste workers to repackage and dispose of materials</text_data><comment_date>2020-12-17T00:00:00</comment_date></row><row _id="row-u8e4-c75n~ezkz" _uuid="00000000-0000-0000-8A57-19EFBA2CA138" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u8e4-c75n~ezkz"><intent_id>1282066</intent_id><project_id>1039963</project_id><text_data>SA 11697</text_data><comment_date>2022-11-08T00:00:00</comment_date></row><row _id="row-i7sy~zdez~74wi" _uuid="00000000-0000-0000-5071-C9689E89BB09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7sy~zdez~74wi"><intent_id>885616</intent_id><project_id>842469</project_id><text_data>PC1 - Job #4114Project #W20055CB</text_data><comment_date>2018-01-29T00:00:00</comment_date></row><row _id="row-7s87-sq3i.w666" _uuid="00000000-0000-0000-22BF-0C9B7F257B1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7s87-sq3i.w666"><intent_id>548034</intent_id><project_id>701276</project_id><text_data>This contract was awarded to us after the previous contractor went out of business.</text_data><comment_date>2012-12-11T00:00:00</comment_date></row><row _id="row-96if-tkvq~tmpg" _uuid="00000000-0000-0000-067B-CF3BE8D7E428" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96if-tkvq~tmpg"><intent_id>818853</intent_id><project_id>803568</project_id><text_data>Job #110696-001</text_data><comment_date>2017-03-03T00:00:00</comment_date></row><row _id="row-rg5v-6xb9.9938" _uuid="00000000-0000-0000-16BB-07DF80174953" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rg5v-6xb9.9938"><intent_id>934428</intent_id><project_id>862051</project_id><text_data>Originally this job was filed under intent #820747, but we were informed by Federal Way Public Schools that this job was a part of a different PO and needed its own intent # as well as a separately filed Certified Payroll and an Affidavit #.</text_data><comment_date>2018-09-20T00:00:00</comment_date></row><row _id="row-pt4f-hbj2-b3ch" _uuid="00000000-0000-0000-1AB4-989BF4FB435B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pt4f-hbj2-b3ch"><intent_id>531048</intent_id><project_id>694726</project_id><text_data>General Laborers - manual labor using rakes, shovels, hoesMotor Grader, Non-Finishing - rigid frame with smaller blade to prep earth for concrete workOther Trucks - Water Trucks &amp;lt; 3000 gal,, used mostly for dust control</text_data><comment_date>2012-08-27T00:00:00</comment_date></row><row _id="row-6stf_ccpw~qr8y" _uuid="00000000-0000-0000-1B78-DFD452C0FC55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6stf_ccpw~qr8y"><intent_id>930823</intent_id><project_id>860686</project_id><text_data>The WSCCA&amp;#39;s basement and loading dock is designed to be located under existing Olive Way; thus to construct the foundation system, Olive Way will be excavated. This will remove current Seattle City Light and CenturyLink utilities offline. To maintain services provided by Olive Way utilities, Clark/Lewis is re-routing these utilities north on 9th Avenue, east to west on Howell Street and south on Boren, which includes five new Seattle City Light vaults, two CenturyLink vaults, and ductbanks connection the vaults through existing streets.</text_data><comment_date>2018-09-17T00:00:00</comment_date></row><row _id="row-ddgw-g88b-ne76" _uuid="00000000-0000-0000-8609-5830866C4393" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ddgw-g88b-ne76"><intent_id>521836</intent_id><project_id>691427</project_id><text_data>#1 - Is the structure a single family dwelling, duplex, apartment, condominium or other residential structure? YES  #2 - Including any basement or garage, how many stories or levels does the structure have? 2  #3 - What is the facility used for? --Answer �yes� or �no� to each of the following options: (a) Permanent residence only?  YES  (b) Rehabilitation house NO (c) Transitional housing?NO (d) Communal dining facility?NO  (e) Treatment services?NO (f) Counseling?NO (g) Other? NO #4 - Does each dwelling unit have its own self-contained kitchen? YES #5 - Does each dwelling unit have its own bathroom?YES  #6 - Is there a community facility or manager�s office on site?NO #7 - Is any part of the facility used by members of the public?NO</text_data><comment_date>2012-07-12T00:00:00</comment_date></row><row _id="row-izhv_3z6e-n6k5" _uuid="00000000-0000-0000-CE18-8A83D4E332D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-izhv_3z6e-n6k5"><intent_id>591440</intent_id><project_id>716890</project_id><text_data>$14.33 Fringe is for pension. It would be helpful to add some boxes in the wage and fringe section so this information can be entered there if you're requiring a break down now.</text_data><comment_date>2013-09-09T00:00:00</comment_date></row><row _id="row-zhp4-jtdt_j3re" _uuid="00000000-0000-0000-FA44-2BF962CC12B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhp4-jtdt_j3re"><intent_id>1218688</intent_id><project_id>1004192</project_id><text_data>INV # 88428231 SR # 51454320</text_data><comment_date>2022-03-17T00:00:00</comment_date></row><row _id="row-ftee~najs~39td" _uuid="00000000-0000-0000-4BD9-91CAE58B32EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ftee~najs~39td"><intent_id>691650</intent_id><project_id>741566</project_id><text_data>Magellan Insulation is a dba of Insulation Contractors, Inc. I&amp;#39;ve corrected it to the correct contractor registration license, UBI#:601160822  Reg#:INSULCI117KS</text_data><comment_date>2015-05-07T00:00:00</comment_date></row><row _id="row-h8ru_wgg9~vpif" _uuid="00000000-0000-0000-B834-A99B3A4E7C6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h8ru_wgg9~vpif"><intent_id>989217</intent_id><project_id>884711</project_id><text_data>Filed by Chris Murray</text_data><comment_date>2019-07-02T00:00:00</comment_date></row><row _id="row-zjra.92cr_njjy" _uuid="00000000-0000-0000-1C2A-94738E77FFBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zjra.92cr_njjy"><intent_id>1127871</intent_id><project_id>953791</project_id><text_data>CVSE7886-0005267</text_data><comment_date>2021-03-10T00:00:00</comment_date></row><row _id="row-zu7k_rcjy-g57k" _uuid="00000000-0000-0000-0F15-4B201C5F60EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zu7k_rcjy-g57k"><intent_id>566716</intent_id><project_id>708701</project_id><text_data>Health &amp; Welfare $5.50/hour, Pension $6.10/hour,training/pwle/caf, lecet $.90/hour</text_data><comment_date>2013-04-26T00:00:00</comment_date></row><row _id="row-qzsu.fjig.6h2j" _uuid="00000000-0000-0000-7D68-B7A334532F7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qzsu.fjig.6h2j"><intent_id>1187802</intent_id><project_id>984918</project_id><text_data>#1- Install Whole House fan including ducting and electrical wiring, install kitchen through wall fan including variable speed switch, provide electrical repairs#2- Single Family Dwelling (manufactured home)#3- 1 story#4 (a)- no#4 (b)- no#4 (c)- yes#4 (d)- no#4 (e)- no#4 (f)- no#4 (g)- no#4 (h)- no#4 (i)- no#4 (j)- no#4 (k)- no#4 (l)- N/A#5- yes#6- yes#7- yes#8- no</text_data><comment_date>2021-10-23T00:00:00</comment_date></row><row _id="row-pwtu_fcfc-bx8k" _uuid="00000000-0000-0000-1D2C-1161CFEAD278" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pwtu_fcfc-bx8k"><intent_id>633106</intent_id><project_id>736278</project_id><text_data>Ind Ins#  547,907-01</text_data><comment_date>2014-06-05T00:00:00</comment_date></row><row _id="row-2wcy~edfy.fc8p" _uuid="00000000-0000-0000-8B3E-29776477CD78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2wcy~edfy.fc8p"><intent_id>497949</intent_id><project_id>680428</project_id><text_data>Project is exempt from state prevailing wage requirements based onThe Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirementsFor the following crafts/trades/occupations.&amp;quot;</text_data><comment_date>2012-02-21T00:00:00</comment_date></row><row _id="row-vk3u~g3r3.bpvr" _uuid="00000000-0000-0000-D91A-E75E1BD01E29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vk3u~g3r3.bpvr"><intent_id>646151</intent_id><project_id>741169</project_id><text_data>This is a KCDA Purchasing Cooperative job contract</text_data><comment_date>2014-08-06T00:00:00</comment_date></row><row _id="row-zh8x-s8jj-5rv3" _uuid="00000000-0000-0000-066D-4AC6D2B83CB0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zh8x-s8jj-5rv3"><intent_id>1112307</intent_id><project_id>944919</project_id><text_data>9856016</text_data><comment_date>2020-12-29T00:00:00</comment_date></row><row _id="row-fb9z-6gi7-st8x" _uuid="00000000-0000-0000-E2C7-30EA9A304151" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fb9z-6gi7-st8x"><intent_id>487764</intent_id><project_id>677721</project_id><text_data>Job # C11083</text_data><comment_date>2011-11-07T00:00:00</comment_date></row><row _id="row-7xcx.vw7m-w4eh" _uuid="00000000-0000-0000-0276-0066A20F6A5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7xcx.vw7m-w4eh"><intent_id>1069327</intent_id><project_id>899823</project_id><comment_date>2020-07-01T00:00:00</comment_date></row><row _id="row-q9j5_4a76-s54z" _uuid="00000000-0000-0000-8C6A-A592DE3CECD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9j5_4a76-s54z"><intent_id>975525</intent_id><project_id>880145</project_id><text_data>#1 � The crew will be installing a furnace and water heater#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2019-05-02T00:00:00</comment_date></row><row _id="row-hadg-dcs8_3u3v" _uuid="00000000-0000-0000-62F0-5020147D36D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hadg-dcs8_3u3v"><intent_id>958156</intent_id><project_id>872199</project_id><text_data>Dump Truck is 10 Cubic Yard End DumpWater Truck is 2000 gallon tank</text_data><comment_date>2019-01-31T00:00:00</comment_date></row><row _id="row-kz7u-nbss_k7h9" _uuid="00000000-0000-0000-1715-6D9FCB2381B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kz7u-nbss_k7h9"><intent_id>925617</intent_id><project_id>858728</project_id><text_data>Various Locations - This is T&amp;M NTE $1,000,000.00 over a 2 year period and locations are based on work orders as assigned by King Co.</text_data><comment_date>2018-08-14T00:00:00</comment_date></row><row _id="row-dp6j~ei84_6htm" _uuid="00000000-0000-0000-6781-67D01A265509" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dp6j~ei84_6htm"><intent_id>612191</intent_id><project_id>727419</project_id><text_data>1)We were contracted to replace a gas furnace in a residentail home, 2)Single family dwelling, 3)2, 4)A: No, B:No, C:Yes, D:No, E:No, F:No, G:No, H:No, I:No, J:No, K:No. 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2014-01-15T00:00:00</comment_date></row><row _id="row-fyen-banh_2hz5" _uuid="00000000-0000-0000-F086-F836BD475D72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fyen-banh_2hz5"><intent_id>620811</intent_id><project_id>703260</project_id><text_data>FRINGES INCLUDE HEALTH AND WELFARE, PENSION AND ANNUITY.FRINGE $19.55 = HEALTH AND WELFARE $7.10, PENSION $7.05, ANNUITY $5.40FRINGE $6.58, $6.66, $6.74, $10.26, $10.49 = PENSIONFRINGE $9.89 = HEALTH</text_data><comment_date>2014-03-19T00:00:00</comment_date></row><row _id="row-2876_r7pw-vdx5" _uuid="00000000-0000-0000-C94D-36B2B49E8132" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2876_r7pw-vdx5"><intent_id>487432</intent_id><project_id>325127</project_id><text_data>PLEASE NOTE:  This replaces intent #203244.  Original intent was filed without taking into account need for multiple counties (King and Thurston).  General laborers use no tools other than hand trucks and carts to move cabinets from the trucks to the installation locations in the building(s).  Truck drivers drive 16' and 24' box trucks for delivery of cabinets.</text_data><comment_date>2011-11-03T00:00:00</comment_date></row><row _id="row-6jtc.dgy9_javg" _uuid="00000000-0000-0000-E26A-678B6CA3ED1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6jtc.dgy9_javg"><intent_id>1150820</intent_id><project_id>960147</project_id><text_data>212086- Per WAC-296-127-01322 Electronic Technician will be installing cabling for cameras. Cables will be ran indoor or outdoor. Terminate, test and label.</text_data><comment_date>2021-06-08T00:00:00</comment_date></row><row _id="row-nfeh~5fex.mkin" _uuid="00000000-0000-0000-7C7C-CD8B28015FBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nfeh~5fex.mkin"><intent_id>1072802</intent_id><project_id>925701</project_id><comment_date>2020-07-16T00:00:00</comment_date></row><row _id="row-5aip~k6pm.bvqq" _uuid="00000000-0000-0000-4AC2-AAC79E1CBB99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5aip~k6pm.bvqq"><intent_id>553421</intent_id><project_id>703638</project_id><text_data>All address are locate in the city of Tacoma.1.  Joshue Larson    715 East 49th Street2.  Cutlip Sandra    3222 South 43rd Street3.  Brook Geraldine    1823 South 16th Street4.  Walsh Cheree    5410 South State Street5.  Teresa Hansen    701 North C. Street6.  Durham Heather    3805 South 31rst Street</text_data><comment_date>2013-01-24T00:00:00</comment_date></row><row _id="row-4pp2.v6sn-e428" _uuid="00000000-0000-0000-FCBA-B21A96C5F12C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4pp2.v6sn-e428"><intent_id>749948</intent_id><project_id>783687</project_id><text_data>Filed by Candis BrinkProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24CFR 965 101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2016-03-04T00:00:00</comment_date></row><row _id="row-42i4-pw2k_2cv8" _uuid="00000000-0000-0000-8147-58E3622A0B5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-42i4-pw2k_2cv8"><intent_id>473239</intent_id><project_id>672675</project_id><text_data>CDM # 6654,6656, &amp;6658Viking Co-op</text_data><comment_date>2011-08-19T00:00:00</comment_date></row><row _id="row-3msk_xd8j-fv2n" _uuid="00000000-0000-0000-9649-99F6CE18B7E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3msk_xd8j-fv2n"><intent_id>1011283</intent_id><project_id>871731</project_id><text_data>WM hired R Transport to provide trucking</text_data><comment_date>2019-10-01T00:00:00</comment_date></row><row _id="row-es7s-sjxd.snsi" _uuid="00000000-0000-0000-D372-13D1A23BA244" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-es7s-sjxd.snsi"><intent_id>1036970</intent_id><project_id>907583</project_id><text_data>E. Lawrence St. Mount Vernon, WA 982731. Air seal, attic blow, duct seal, wall blow, crawl, mechanical ventilation2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. No</text_data><comment_date>2020-02-07T00:00:00</comment_date></row><row _id="row-kvw7_fnp4.ytme" _uuid="00000000-0000-0000-3DD9-6EEFAE0BD63D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvw7_fnp4.ytme"><intent_id>993143</intent_id><project_id>887692</project_id><text_data>no note</text_data><comment_date>2019-07-19T00:00:00</comment_date></row><row _id="row-5m88.k2er-ai6v" _uuid="00000000-0000-0000-A53F-9D87DFCB9279" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5m88.k2er-ai6v"><intent_id>464796</intent_id><project_id>664237</project_id><text_data>The dump truck &amp; trailer classification we are using is for our semi-tractor and belly dump trailers.  This classification has been used for two other jobs, so this is the classification I went with.</text_data><comment_date>2011-07-08T00:00:00</comment_date></row><row _id="row-5bpr_44an_cvnf" _uuid="00000000-0000-0000-9373-AB086D43FDCF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bpr_44an_cvnf"><intent_id>615138</intent_id><project_id>721816</project_id><text_data>Filed by Jason Stollenwerk.</text_data><comment_date>2014-02-05T00:00:00</comment_date></row><row _id="row-6gxw.9qfy.t2h5" _uuid="00000000-0000-0000-FDD4-8CF562D5EFBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6gxw.9qfy.t2h5"><intent_id>1021298</intent_id><project_id>899308</project_id><text_data>Install new cables per plan and walkthrough. Terminate cables to closest IBF. Install RJ45 mod ends on device end. Test and label. Indoors for data system at Cedarcrest Middle Marysville WA</text_data><comment_date>2019-11-12T00:00:00</comment_date></row><row _id="row-tx8b-fvgx~evjg" _uuid="00000000-0000-0000-F894-D914581639E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tx8b-fvgx~evjg"><intent_id>1133859</intent_id><project_id>957091</project_id><text_data>Prime Job# 1008272</text_data><comment_date>2021-04-06T00:00:00</comment_date></row><row _id="row-4bff-49vf.eqv8" _uuid="00000000-0000-0000-6E73-EE744A1E28B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4bff-49vf.eqv8"><intent_id>502244</intent_id><project_id>683498</project_id><text_data>It is my understanding that we do not need, and therfore, do not have an Industrial Insurance Account ID# because we are an Oregon based company and our employees are from Oregon, they do not live in Washington nor work for a Washington State Company.</text_data><comment_date>2012-03-01T00:00:00</comment_date></row><row _id="row-kt93.2knx_qx74" _uuid="00000000-0000-0000-8B97-E7A31A133E80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kt93.2knx_qx74"><intent_id>1025399</intent_id><project_id>900877</project_id><text_data>The Telecommunication Technician will remove and pull telecom cable between the MDF/IDF, terminate, test cable will perform by Electronic Technician.</text_data><comment_date>2019-12-06T00:00:00</comment_date></row><row _id="row-kge2-e6sd.xem4" _uuid="00000000-0000-0000-D1F4-8B291FCD7504" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kge2-e6sd.xem4"><intent_id>529421</intent_id><project_id>694191</project_id><text_data>Filed By Kristen tisdale</text_data><comment_date>2012-08-20T00:00:00</comment_date></row><row _id="row-4m3h~rkah~eaca" _uuid="00000000-0000-0000-E6B3-7DDA329D273A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4m3h~rkah~eaca"><intent_id>958960</intent_id><project_id>872593</project_id><text_data>PC3 - Job #4180CB</text_data><comment_date>2019-02-06T00:00:00</comment_date></row><row _id="row-48qr~kjd6.wect" _uuid="00000000-0000-0000-04B2-7E0B837AFDC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48qr~kjd6.wect"><intent_id>641492</intent_id><project_id>736264</project_id><text_data>605 nw fiskk st #81 Pullman,wa 99163 1. install water heater 2. single family mobile home 3. 1 level 4a. no b. no c. yes d. no e. no f. no g. no h. no i.no k. no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2014-07-16T00:00:00</comment_date></row><row _id="row-fpv2~uax4_82hr" _uuid="00000000-0000-0000-2595-A95F571B6361" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fpv2~uax4_82hr"><intent_id>657653</intent_id><project_id>745548</project_id><text_data>As the artist, I will be bringing the artwork to the sight. I will be handling the glass work and placing the panels into the correct order and position. The facilities carpenter will use a screw gun to attach all the stops (holding the panels in place) to the building. This should all take less than a day.</text_data><comment_date>2014-10-13T00:00:00</comment_date></row><row _id="row-hbs7~3uxd_kzqf" _uuid="00000000-0000-0000-9891-66805EA3AF16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hbs7~3uxd_kzqf"><intent_id>763378</intent_id><project_id>786064</project_id><text_data>File by Crystal Huff</text_data><comment_date>2016-05-20T00:00:00</comment_date></row><row _id="row-qz89-uri8-j8wb" _uuid="00000000-0000-0000-DF44-658BC09AE7BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qz89-uri8-j8wb"><intent_id>1136556</intent_id><project_id>953504</project_id><text_data>120688-001</text_data><comment_date>2021-04-16T00:00:00</comment_date></row><row _id="row-ew8j~r8ju.9i97" _uuid="00000000-0000-0000-5896-1B59E2BC3C34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ew8j~r8ju.9i97"><intent_id>995766</intent_id><project_id>888736</project_id><text_data>General laborer work includes laying and taping seams of plastic sheeting. Tools included for this work are tape measure and utility knife.</text_data><comment_date>2019-08-13T00:00:00</comment_date></row><row _id="row-y3u7-9fck~74rm" _uuid="00000000-0000-0000-F4E8-2DFE9C32D2E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y3u7-9fck~74rm"><intent_id>707289</intent_id><project_id>759520</project_id><text_data>JCI Project Number 5N59-0067</text_data><comment_date>2015-07-14T00:00:00</comment_date></row><row _id="row-p7tr_nnjs~2ner" _uuid="00000000-0000-0000-0FFF-C516C5EFBD57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7tr_nnjs~2ner"><intent_id>1010520</intent_id><project_id>900020</project_id><text_data>Other truck is a water truck</text_data><comment_date>2019-09-27T00:00:00</comment_date></row><row _id="row-qedc_wjgp~r2g9" _uuid="00000000-0000-0000-D68F-165523ED03E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qedc_wjgp~r2g9"><intent_id>533568</intent_id><project_id>694459</project_id><text_data>042214</text_data><comment_date>2012-09-10T00:00:00</comment_date></row><row _id="row-7xnh.m35t~5dsp" _uuid="00000000-0000-0000-2226-27CF6B194685" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7xnh.m35t~5dsp"><intent_id>1282687</intent_id><project_id>1040363</project_id><text_data>sr53285048</text_data><comment_date>2022-11-10T00:00:00</comment_date></row><row _id="row-ccgx.vdcr-at39" _uuid="00000000-0000-0000-082D-5AD37893681D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ccgx.vdcr-at39"><intent_id>1528543</intent_id><project_id>1181804</project_id><text_data>We will be using hand tools such as rakes, spades and shovels.</text_data><comment_date>2025-04-20T00:00:00</comment_date></row><row _id="row-6nyk~d722.twfn" _uuid="00000000-0000-0000-A3FA-B8DF9E2B52EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6nyk~d722.twfn"><intent_id>624336</intent_id><project_id>663016</project_id><text_data>Salish Networks is a 100% Tulalip Tribes owned company located within the bounds of the Tulalip Reservation. The Tribe and all business entities are exempt from Washington State Workers Compensation Insurance Requirements. All employees are covered under Tribal First Insurance.Work will be conducted outside and will consist on removing and reinstalling fiber optic cabling.</text_data><comment_date>2014-04-10T00:00:00</comment_date></row><row _id="row-74k3~w695~4mhj" _uuid="00000000-0000-0000-944C-38C6A82ECC4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74k3~w695~4mhj"><intent_id>859201</intent_id><project_id>825512</project_id><text_data>TRUCKSlowboy delivers asphalt rotomill to jobsite</text_data><comment_date>2017-08-29T00:00:00</comment_date></row><row _id="row-d7xh.sj9v_r9p4" _uuid="00000000-0000-0000-DEE6-8F59CA5C97A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7xh.sj9v_r9p4"><intent_id>711848</intent_id><project_id>751691</project_id><text_data>Trucking services only.  Project scope is continued construction of HOV lanes in Tacoma.</text_data><comment_date>2015-08-04T00:00:00</comment_date></row><row _id="row-7k4b.idzj-wvmk" _uuid="00000000-0000-0000-358D-03C898F56B73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7k4b.idzj-wvmk"><intent_id>1008935</intent_id><project_id>893965</project_id><text_data>camera the line in the WETRC Bldg; they are starting a project and want to see which line is bad</text_data><comment_date>2019-09-20T00:00:00</comment_date></row><row _id="row-f76u_3ykk-4imz" _uuid="00000000-0000-0000-6E3C-36C311BBF74E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f76u_3ykk-4imz"><intent_id>1049547</intent_id><project_id>914706</project_id><text_data>Order A55373</text_data><comment_date>2020-04-03T00:00:00</comment_date></row><row _id="row-d4dc.hmdv-kve5" _uuid="00000000-0000-0000-9783-FA006A509F92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4dc.hmdv-kve5"><intent_id>493183</intent_id><project_id>680706</project_id><text_data>FRINGE BENEFITS FOR JOURNEY LEVEL:  NAT'L PENSION $1.76, NW PENSION $4.49, HEALTH $7.95, I FUND 4.33, NEMI $.17, APPR FUND $.90, NW SUPP PLAN $.63, CLEAN CARD $.07</text_data><comment_date>2012-01-03T00:00:00</comment_date></row><row _id="row-z6h4.4n4c-tm4c" _uuid="00000000-0000-0000-196D-75E775D0D314" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z6h4.4n4c-tm4c"><intent_id>1008727</intent_id><project_id>885387</project_id><text_data>22694</text_data><comment_date>2019-09-20T00:00:00</comment_date></row><row _id="row-wqs5-9gmn_nc73" _uuid="00000000-0000-0000-8AF9-53A9A8C71E17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wqs5-9gmn_nc73"><intent_id>1146559</intent_id><project_id>963390</project_id><text_data>Installers will set washer in place, drill cement, use anchor bolts to hold washer &amp; grout washing machines. Install drying cabinet.</text_data><comment_date>2021-05-21T00:00:00</comment_date></row><row _id="row-hipz.mhbf.sa5y" _uuid="00000000-0000-0000-4FFC-373BEF636641" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hipz.mhbf.sa5y"><intent_id>877477</intent_id><project_id>837152</project_id><text_data>6046 46th Ave SW#1-Decommission heating oil tank#2-Single Family Dwelling#3-unknown#4-Residence#5-Unknown#6-Unknown#7-Unknown#8-Unknown</text_data><comment_date>2017-12-04T00:00:00</comment_date></row><row _id="row-aped~3kgu.ctyq" _uuid="00000000-0000-0000-C67F-0B9CE2932C10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aped~3kgu.ctyq"><intent_id>804387</intent_id><project_id>802455</project_id><text_data>3601 Castlevale Road #30Yakima, WA 98902</text_data><comment_date>2016-11-28T00:00:00</comment_date></row><row _id="row-qyku~d8dr_bt9b" _uuid="00000000-0000-0000-D993-CCF978CB1B43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qyku~d8dr_bt9b"><intent_id>842848</intent_id><project_id>825307</project_id><text_data>We are installing a pre-engineered audio/visual projector solution in school meeting room.</text_data><comment_date>2017-06-23T00:00:00</comment_date></row><row _id="row-tb5p.nc6j-ytm7" _uuid="00000000-0000-0000-52EB-AFDD2453F9F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tb5p.nc6j-ytm7"><intent_id>1107500</intent_id><project_id>917758</project_id><text_data>I completed the L&amp;I Prevailing Wage tutorial today, 12/15/2020, to correct my submission.</text_data><comment_date>2020-12-15T00:00:00</comment_date></row><row _id="row-3jpg-i2kj_v6kn" _uuid="00000000-0000-0000-388D-52688E47F3F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3jpg-i2kj_v6kn"><intent_id>954249</intent_id><project_id>868833</project_id><text_data>General laborer consists of hand work only (no power tools or equipment) $31.43 base + $7.86 pensionBlade operator is used to help with compaction before paving operations $35.99 base + $9.00 pensionOther trucks consists of the following:1) 0 to 8,000 gallon water truck used to help with compaction and dust control $36.19 base + $9.05 pension2) Oil distributor is used to distribute oil for chip sealing operations $36.19 base + $9.05 pension</text_data><comment_date>2019-01-09T00:00:00</comment_date></row><row _id="row-unas-kg3g~bu9y" _uuid="00000000-0000-0000-6CE4-EE6D7DC0C02C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-unas-kg3g~bu9y"><intent_id>1269456</intent_id><project_id>1032607</project_id><text_data>Owner operator will be doing all the work.</text_data><comment_date>2022-09-26T00:00:00</comment_date></row><row _id="row-jgsw-sxh5~54u8" _uuid="00000000-0000-0000-9EB4-A3192699FADB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgsw-sxh5~54u8"><intent_id>454638</intent_id><project_id>644558</project_id><text_data>TRUCK TYPE: TR (AS LISTED ON OUR WASHINGTON REGISTRATION CAB CARD)TRUCK SIZE: GROSS WEIGHT OR COMBINED GROSS WEIGHT 80,000 (AS LISTED ON OUR WASHINGTON REGISTRATION CAB CARD)PURPOSE OF TRUCK OPERATED: TO DELIVER OUR MATERIAL TO THE JOBSITE; FABRICATED STRUCTURAL STEEL DELIVERIESSMALLER DELIVERIES ARE MADE USING A FORD F350 AND FLATBED TRAILER</text_data><comment_date>2011-05-12T00:00:00</comment_date></row><row _id="row-dg9a.skzy~zx2c" _uuid="00000000-0000-0000-5884-C32A4DCF426B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dg9a.skzy~zx2c"><intent_id>895167</intent_id><project_id>846855</project_id><text_data>Reference to PO# 4500462097</text_data><comment_date>2018-03-27T00:00:00</comment_date></row><row _id="row-ht9m.hqvb~y32y" _uuid="00000000-0000-0000-3ED4-86DF940CAE1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ht9m.hqvb~y32y"><intent_id>831222</intent_id><project_id>815298</project_id><text_data>INTENT VERBAGE1. TRUCK DRIVER - DRIVING TRUCK MOUNTED HYDROSEEDER AND SKID STEER2. NOZZELMAN - SPRAYING HYDROMULCHING AND OPERATING SKID STEER3. LANDSCAPE LABORER - LOADING SEED, FERTILIZER, MULCH INTO MACHINE BE HAND AND CLEANINGNOTE: ALL FRINGE IS PAID TO DAVIS BACONVESTING:Prevailing wage contribution. If the work you perform for the Employer is subject to prevailing wage laws, then the Employer will make contributions to this Plan to help satisfy the fringe benefit requirements of the law. You will receive this contribution based on work you perform during a Plan Year that is subject to the law. The contribution is 100% vested PARTICIPATION:If you are working under a prevailing wage contract, then for purposes of receiving any prevailing wage contribution made to the Plan, you are eligible to participate on the date your employment is covered under the contract and will enter the Plan on that date, unless the prevailing wage contract provides otherwise.</text_data><comment_date>2017-05-05T00:00:00</comment_date></row><row _id="row-3e83~7c8p~538i" _uuid="00000000-0000-0000-C9EE-720673F3E573" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3e83~7c8p~538i"><intent_id>668939</intent_id><project_id>750320</project_id><text_data>Sites:Moncada  -  3080 N. Oak Harbor Road, Oak Harbor, WA 98277Miller - 901 SW Kingma Ct, Oak Harbor, WA 982771.  insulation, fan installation2.  single family3.  one house has 1 story, 1 house has 3 including basement4.  a. no b. no c. yes d. no e. no f. no g. no h. no i. no j. no5.  yes6.  yes7.  no8.  no</text_data><comment_date>2014-12-09T00:00:00</comment_date></row><row _id="row-mh7h_ekxh-k3wq" _uuid="00000000-0000-0000-4AE1-8EE1A38D89C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mh7h_ekxh-k3wq"><intent_id>701799</intent_id><project_id>765275</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2015-06-22T00:00:00</comment_date></row><row _id="row-bdjr~6h5c~gg3q" _uuid="00000000-0000-0000-9A8E-7B217A665BEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bdjr~6h5c~gg3q"><intent_id>1046305</intent_id><project_id>912964</project_id><text_data>#1-We were contracted to fix the furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2020-03-18T00:00:00</comment_date></row><row _id="row-urxz_4rmw-48sq" _uuid="00000000-0000-0000-D08C-428B35693C07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-urxz_4rmw-48sq"><intent_id>1203509</intent_id><project_id>994471</project_id><text_data>This is a contract for Landscape Maintenance services for Snohomish County Fire, District #1 in Snohomish County. This is This is year 4 of a 5 year contract.  Work will include mowing, trimming, blowing of hard surfaces, litter removal, leaf fall removal, weeding, edging, raking, and irrigation monitoring.  Equipment to be used will consist of walk behind mowers, line trimmers, edgers, backpack blowers for various clean up, hand tools, and buckets as need to complete the work on the existing turf and planting bed areas.</text_data><comment_date>2022-01-10T00:00:00</comment_date></row><row _id="row-vcds~3fsb-cqwr" _uuid="00000000-0000-0000-4C88-50074F23DCDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vcds~3fsb-cqwr"><intent_id>1016006</intent_id><project_id>864103</project_id><comment_date>2019-10-17T00:00:00</comment_date></row><row _id="row-ngdq-6nde-fa9h" _uuid="00000000-0000-0000-CAA3-052555C4DCAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ngdq-6nde-fa9h"><intent_id>828472</intent_id><project_id>818888</project_id><text_data>1. TRUCK DRIVER - DRIVING TRUCK MOUNTED HYDROSEEDER AND SKID STEER2. NOZZELMAN - SPRAYING HYDROMULCHING AND OPERATING SKID STEER3. LANSCAPE LABORER - LOADING SEED, FERTILIZER, MULCH INTO MACHINE BE HAND AND CLEANINGNOTE: ALL FRINGE IS PAID TO DAVIS BACONVESTING:Prevailing wage contribution. If the work you perform for the Employer is subject to prevailing wage laws, then the Employer will make contributions to this Plan to help satisfy the fringe benefit requirements of the law. You will receive this contribution based on work you perform during a Plan Year that is subject to the law. The contribution is 100% vested PARTICIPATION:If you are working under a prevailing wage contract, then for purposes of receiving any prevailing wage contribution made to the Plan, you are eligible to participate on the date your employment is covered under the contract and will enter the Plan on that date, unless the prevailing wage contract provides otherwise.</text_data><comment_date>2017-04-24T00:00:00</comment_date></row><row _id="row-cm5t~ep6t.yaw8" _uuid="00000000-0000-0000-ACD2-58F4B56E0A59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cm5t~ep6t.yaw8"><intent_id>865649</intent_id><project_id>830839</project_id><text_data>GARY REED &amp; SONS LLC  IS A DUMP TRUCKING COMPANY - OWNERS GARY REED &amp; JOE REED</text_data><comment_date>2017-09-27T00:00:00</comment_date></row><row _id="row-hsnv_vj44~vptj" _uuid="00000000-0000-0000-3A3D-DC373ADA2D9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hsnv_vj44~vptj"><intent_id>480688</intent_id><project_id>579414</project_id><text_data>We planting trees and hydroseeding area.  We will use rakes, shovels, wheelbarrows.  We might also use a small bobcat tomove trees if the area size allows.</text_data><comment_date>2011-09-28T00:00:00</comment_date></row><row _id="row-mvwh~rr36-ixnz" _uuid="00000000-0000-0000-4562-808FBC8B0E7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mvwh~rr36-ixnz"><intent_id>560190</intent_id><project_id>706836</project_id><text_data>Invoice #705168</text_data><comment_date>2013-03-14T00:00:00</comment_date></row><row _id="row-fiia_x3xw~r9c7" _uuid="00000000-0000-0000-89B9-46A53AB0A75A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fiia_x3xw~r9c7"><intent_id>852644</intent_id><project_id>820048</project_id><text_data>Idaho industrial insurance</text_data><comment_date>2017-08-04T00:00:00</comment_date></row><row _id="row-vb3f_ixem.wfrc" _uuid="00000000-0000-0000-6DA0-CAAFB6D4269B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vb3f_ixem.wfrc"><intent_id>839720</intent_id><project_id>813564</project_id><text_data>Order 815140</text_data><comment_date>2017-06-11T00:00:00</comment_date></row><row _id="row-8qej.8877.pzv3" _uuid="00000000-0000-0000-38D3-1B45708DC814" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8qej.8877.pzv3"><intent_id>749293</intent_id><project_id>775506</project_id><text_data>PCL HIRED US</text_data><comment_date>2016-03-02T00:00:00</comment_date></row><row _id="row-7ie9-jqy7_vabk" _uuid="00000000-0000-0000-0087-40AA62ECBE65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ie9-jqy7_vabk"><intent_id>1018456</intent_id><project_id>892084</project_id><text_data>FILED BY DARREL MORGAN</text_data><comment_date>2019-10-29T00:00:00</comment_date></row><row _id="row-7zh6.bgjn~38h7" _uuid="00000000-0000-0000-1FFA-DC8C511FB0BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zh6.bgjn~38h7"><intent_id>1170792</intent_id><project_id>932959</project_id><text_data>NW PENSION          10.00    LOCAL APPR            1.10    HEALTH CARE / VEB          13.46    ORG TRUST            1.00    IND FUND            0.65    NATL PENSION            4.24    ITI/NEMI/SMOHI            0.17    NW SUPPLEMENTAL            0.79    CLEAN CARD            0.07         TOTAL          31.48            BT Journeyman</text_data><comment_date>2021-08-19T00:00:00</comment_date></row><row _id="row-wssx.d799.9izr" _uuid="00000000-0000-0000-9A88-431557DAD4E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wssx.d799.9izr"><intent_id>732400</intent_id><project_id>777212</project_id><text_data>1) Fringe: Vacation (2.00), Medical (5.92), 401K (2.00) = 9.922) Fringe: Vacation (0.50), Medical (2.83), 401K (0.00) = 3.333) Fringe: Vacation (2.00), Medical (3.01), 401K (1.55) = 6.564) Fringe: Vacation (2.00), Medical (6.05), 401K (0.00) = 8.055) Fringe: Vacation (1.00), Medical (0.00), 401K (1.20) = 2.206) Fringe: Vacation (1.00), Medical (5.33), 401K (1.45) = 7.787) Fringe: Vacation (1.00), Medical (1.44), 401K (1.39) = 3.83</text_data><comment_date>2015-11-19T00:00:00</comment_date></row><row _id="row-bsci~d9jy_2ddh" _uuid="00000000-0000-0000-1A67-C9A5906894B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bsci~d9jy_2ddh"><intent_id>1266699</intent_id><project_id>1031095</project_id><text_data>Fringes: Vacation $.92, Insurance $9.46, Industry Improvement $.50Fringes: Vacation $4.00, Assessment $1.30, Insurance $9.46, Pension $16.55, Training $1.63, Industry Improvement $.50</text_data><comment_date>2022-09-14T00:00:00</comment_date></row><row _id="row-uyp6-q7e9_ghyg" _uuid="00000000-0000-0000-2CB8-0F0D4046C9BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uyp6-q7e9_ghyg"><intent_id>660662</intent_id><project_id>743232</project_id><text_data>Our work on this project is hydroseed application.</text_data><comment_date>2014-10-16T00:00:00</comment_date></row><row _id="row-hugs-ngt2~2ys3" _uuid="00000000-0000-0000-9A91-DF67B9883111" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hugs-ngt2~2ys3"><intent_id>823462</intent_id><project_id>814500</project_id><text_data>let me clarify what we are doing, the intent of the ICRC is to prevent dust from other trades entering the occupied areas of the building during their work, this barrier is made out of plastic sheeting and is held in place using white tape on the seems and the top and bottom and if applicable we staple using 1/2&amp;quot; staples.  we put together a metal frame, this frame is not attached to any finished walls, ceilings or flooring, it is held together using metal screws.  the only reason we need the metal frame is to help hold the plastic sheeting in place. my guys are not carpenters, this is not a wall or wood structure, its  sole purpose is temporary dust control, and will be removed at the end of the job.  please re-consider and allow general labor rate to be usedthank youBob Guiley253-606-4905</text_data><comment_date>2017-04-07T00:00:00</comment_date></row><row _id="row-8z6b_uzkb~ei7y" _uuid="00000000-0000-0000-A359-31E1C87CAD99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8z6b_uzkb~ei7y"><intent_id>1132061</intent_id><project_id>956051</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.</text_data><comment_date>2021-04-05T00:00:00</comment_date></row><row _id="row-p5rs_upqh-m33x" _uuid="00000000-0000-0000-159F-11A61F94F647" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p5rs_upqh-m33x"><intent_id>761179</intent_id><project_id>791594</project_id><text_data>GEMERAL LABOR WORK CONSISTS OF THE FOLLOWING: 1) HAND WORK (SHOVEL WORK) NO POWER EQUIPMENT OR POWER TOOLS 2) PILOT CAR DRIVER USED FOR MOBILIZING HEAVY EQUIPEMTN TO AND FROM THE PROJECT SITE. BLADE OPERATOR IS USED FOR GRADING THE PROJECT SITE FOR COMPACTION BEFORE PAVING OR CHIP SEALING OTHER TRUCKS CONSIST OF THE FOLLOWING: 1) 0-8,000 GALLOIN WATER TRUCK USED FOR WATERING THE PROJECT SITE DURING THE GRADING PROCESS TO HELP WITH COMPACTION. 2) OIL DISTRIBUTION IS USED FOR OIL DISTRIBUTION DURING CHIP SEALING OPERATIONS.</text_data><comment_date>2016-05-10T00:00:00</comment_date></row><row _id="row-789w.rn2z.5i67" _uuid="00000000-0000-0000-2CAF-B249B28E94B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-789w.rn2z.5i67"><intent_id>608272</intent_id><project_id>701810</project_id><text_data>This Intent is for the Landscape maintenance portion of the Contract.  The contract scope was removal of contaminated material and replanting of a tidal area.</text_data><comment_date>2013-12-12T00:00:00</comment_date></row><row _id="row-nsr4.4wmg_d5ww" _uuid="00000000-0000-0000-20C5-7170E77B557F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nsr4.4wmg_d5ww"><intent_id>599743</intent_id><project_id>720285</project_id><text_data>Our Industirl Insurance account number has been added</text_data><comment_date>2013-10-21T00:00:00</comment_date></row><row _id="row-uihv~tq63~kwv7" _uuid="00000000-0000-0000-4876-93A5F47BF6FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uihv~tq63~kwv7"><intent_id>550197</intent_id><project_id>697478</project_id><text_data>Electronic technician uses laptop to program code for computer system operations, tools include laptop computer and graphic displays. Drive standard company truck.</text_data><comment_date>2013-01-29T00:00:00</comment_date></row><row _id="row-n4um.9grv~phxq" _uuid="00000000-0000-0000-BF93-FACF9D43B15D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n4um.9grv~phxq"><intent_id>641929</intent_id><project_id>737507</project_id><text_data>I apologize, I did not include this on the intent comments.  Work preformed on transaction ID 104411966 will be for trucking aggregate in and out of job site.</text_data><comment_date>2014-07-18T00:00:00</comment_date></row><row _id="row-c6ev~hahq~kiqq" _uuid="00000000-0000-0000-7FD5-96B17CBD31BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6ev~hahq~kiqq"><intent_id>752430</intent_id><project_id>787707</project_id><text_data>Journeyman $14.66 Fringe Benefit Breakdown:  $7.47 Pension, $6.63 Health &amp; Welfare, $0.56 Apprenticeship/Training</text_data><comment_date>2016-03-21T00:00:00</comment_date></row><row _id="row-224t-7dcv~qiek" _uuid="00000000-0000-0000-8D77-61A72F10895D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-224t-7dcv~qiek"><intent_id>1185949</intent_id><project_id>983948</project_id><text_data>Cleaning of Urinal line to clear debris from line</text_data><comment_date>2021-10-15T00:00:00</comment_date></row><row _id="row-47tz_stnn-sqih" _uuid="00000000-0000-0000-2F22-1FE5B6621F55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-47tz_stnn-sqih"><intent_id>532942</intent_id><project_id>695412</project_id><text_data>This is a repair project that was not scheduled. Per Contractorr Registry Department, we are not required to have a license as we are not performing any construction or engineering related work.  Our employee went onsite to repair computer device on an electronic panel</text_data><comment_date>2012-09-06T00:00:00</comment_date></row><row _id="row-txh5_b3uq~yrfx" _uuid="00000000-0000-0000-6B0B-14758264EBAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-txh5_b3uq~yrfx"><intent_id>551804</intent_id><project_id>693442</project_id><text_data>The wage rate is Davis Bacon and made up of $25.01 raw wage and $10.15 fringe pay.  We have paid the fringes as cash for a total pay rate of $35.16</text_data><comment_date>2013-01-14T00:00:00</comment_date></row><row _id="row-hpsp.aggn_e92r" _uuid="00000000-0000-0000-CA19-3C5523CA796F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hpsp.aggn_e92r"><intent_id>873775</intent_id><project_id>835981</project_id><text_data>JOB#1065F-42000</text_data><comment_date>2017-11-08T00:00:00</comment_date></row><row _id="row-83ib-3cia.2hzz" _uuid="00000000-0000-0000-7CC1-9F891ABBFDB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-83ib-3cia.2hzz"><intent_id>1127296</intent_id><project_id>944296</project_id><text_data>#1 - #2 -  #3 - #4 -   (a) 		 (b) 		 (c)		 (d)		 (e) 		 (f) 		 (g) 		 (h) 		 (I) 		 (j) 		 (k) 		 (l) #5 -  #6 - #7 - #8 -</text_data><comment_date>2021-03-08T00:00:00</comment_date></row><row _id="row-egu9_b4sh_aexx" _uuid="00000000-0000-0000-1F41-BCA0CB2EF169" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-egu9_b4sh_aexx"><intent_id>522204</intent_id><project_id>674285</project_id><text_data>Per Kent Anderson of your Industrial Insurance section, we are not required to have an Insutrial Insurance Account since vessel crewmembers are not subject to workmen's comp.</text_data><comment_date>2012-07-13T00:00:00</comment_date></row><row _id="row-u579_5rh4_6xvg" _uuid="00000000-0000-0000-8FCF-336EC7808FCD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u579_5rh4_6xvg"><intent_id>707157</intent_id><project_id>761827</project_id><text_data>Form filed by: Dean Seaburg</text_data><comment_date>2015-07-14T00:00:00</comment_date></row><row _id="row-v9g9_ksxy~fniw" _uuid="00000000-0000-0000-3FE9-A29979159E0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v9g9_ksxy~fniw"><intent_id>1020511</intent_id><project_id>892151</project_id><text_data>Installation of [008] new data cables to [002] locations as shown on site survey. Supply and install materials to support an open pathway, such as J-hooks and hangers where possible. Terminate new data cables within MDF location as specified to new 48prt Cat6 patch panel. Terminate new data cables at workstation with Cat6 RJ45 insert. Test all new data cabling to manufacture and industry standards. Provide as-built documentation.</text_data><comment_date>2019-11-07T00:00:00</comment_date></row><row _id="row-fsu2.inx3~fjhe" _uuid="00000000-0000-0000-8E82-F27FC547314E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fsu2.inx3~fjhe"><intent_id>505390</intent_id><project_id>679566</project_id><text_data>Form filed by: Kelly Bales - murq235</text_data><comment_date>2012-03-27T00:00:00</comment_date></row><row _id="row-9n5j~9n7b.n7rw" _uuid="00000000-0000-0000-13EE-58C48AD53C90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9n5j~9n7b.n7rw"><intent_id>549839</intent_id><project_id>702096</project_id><text_data>Start date is 1/15/13</text_data><comment_date>2012-12-27T00:00:00</comment_date></row><row _id="row-bu9n-jzed~yw9y" _uuid="00000000-0000-0000-C49D-610C06C5A78D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bu9n-jzed~yw9y"><intent_id>1290337</intent_id><project_id>1045076</project_id><text_data>We pay 100% of employee health premiums as part of Fringe //CC</text_data><comment_date>2022-12-15T00:00:00</comment_date></row><row _id="row-vuwm-4ycs.a6qc" _uuid="00000000-0000-0000-7E48-EEFA32C691FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vuwm-4ycs.a6qc"><intent_id>535618</intent_id><project_id>696361</project_id><text_data>In addition to updating your award and start dates, our office is requiring that you file an Affidavit to close out each year's janitorial contract as required by statute and rule.</text_data><comment_date>2012-09-26T00:00:00</comment_date></row><row _id="row-9a87.en94_yqym" _uuid="00000000-0000-0000-DD48-B1258B82A29A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9a87.en94_yqym"><intent_id>506563</intent_id><project_id>682884</project_id><text_data>Per Service Master, agency contact information is: Joe Stump - (509) 961-3707.</text_data><comment_date>2012-04-05T00:00:00</comment_date></row><row _id="row-5psi_7ux3.frfn" _uuid="00000000-0000-0000-AC52-FBE8D5267AE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5psi_7ux3.frfn"><intent_id>1005402</intent_id><project_id>887337</project_id><text_data>Other Truck consists of a 0-8,000 gallon water truck used for watering the project site to help with compaction before chip sealing and/or paving operations.</text_data><comment_date>2019-10-07T00:00:00</comment_date></row><row _id="row-ct9v~3x8s.6s33" _uuid="00000000-0000-0000-596C-296A2B9F5F95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ct9v~3x8s.6s33"><intent_id>1018589</intent_id><project_id>892637</project_id><text_data>1409 Mead AvenueYakima, WA 98902</text_data><comment_date>2019-10-30T00:00:00</comment_date></row><row _id="row-8egd.7dyt_puvp" _uuid="00000000-0000-0000-2DC9-05443C0EB0AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8egd.7dyt_puvp"><intent_id>713838</intent_id><project_id>768159</project_id><text_data>Beautification of area adjacent to housing project through the installation of grass.Hydroseeder, hand toolsConstruction of public housing project</text_data><comment_date>2015-08-12T00:00:00</comment_date></row><row _id="row-c6hr_tt9k-kpni" _uuid="00000000-0000-0000-872B-29C2D685B659" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6hr_tt9k-kpni"><intent_id>744636</intent_id><project_id>784140</project_id><text_data>A. Change out street lights and decorative light retrofitsB. Duties performed by LFM - Lamp removal, socket installation, install of energy efficient LED lamps, documentation and recycle. Tools and equipment used - screw driver, drill, pick up truck, razor knife.</text_data><comment_date>2016-02-19T00:00:00</comment_date></row><row _id="row-gxxy~xzad_pqmv" _uuid="00000000-0000-0000-588E-DE95FE5DFF7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gxxy~xzad_pqmv"><intent_id>1149422</intent_id><project_id>964936</project_id><text_data>Source Electric LLC pays the fringe benefits to IBEW Local 46 Trust Office.  The hourly fringe benefits are: Health &amp; Welfare 10.20/hr., Pension 10.38/hr., 401K 2.25/hr., Joint Apprenticeship Training Committee (JATC) 0.83/hr., &amp; National Electrical Benefit Fund (NEBF) 1.82/hr.</text_data><comment_date>2021-06-03T00:00:00</comment_date></row><row _id="row-z672_r43y~uygg" _uuid="00000000-0000-0000-E1CB-67EB601712C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z672_r43y~uygg"><intent_id>731235</intent_id><project_id>772542</project_id><text_data>installing temporary fence panels using blocks and clamps</text_data><comment_date>2015-11-12T00:00:00</comment_date></row><row _id="row-5pa7.4a2h-87s5" _uuid="00000000-0000-0000-F59F-08BC388C5814" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5pa7.4a2h-87s5"><intent_id>1122454</intent_id><project_id>937566</project_id><text_data>PPC #20056</text_data><comment_date>2021-02-15T00:00:00</comment_date></row><row _id="row-vq8n~gbh9-ygb9" _uuid="00000000-0000-0000-AF74-9EFB26D7B5B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vq8n~gbh9-ygb9"><intent_id>1185606</intent_id><project_id>980526</project_id><text_data>301SNL0547 - INTENT</text_data><comment_date>2021-10-14T00:00:00</comment_date></row><row _id="row-s6tb.bacd-jbjw" _uuid="00000000-0000-0000-0AD1-C9A067A0FE53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s6tb.bacd-jbjw"><intent_id>753878</intent_id><project_id>788365</project_id><text_data>Filed by R.T. Vatne</text_data><comment_date>2016-03-29T00:00:00</comment_date></row><row _id="row-6kgx-adwe-xen2" _uuid="00000000-0000-0000-060E-A66336F4A7D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6kgx-adwe-xen2"><intent_id>1162944</intent_id><project_id>971809</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. BCI Project NO WS1009.</text_data><comment_date>2021-07-23T00:00:00</comment_date></row><row _id="row-avrt_8gu6-eiy3" _uuid="00000000-0000-0000-1F03-F7051625F5C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-avrt_8gu6-eiy3"><intent_id>779354</intent_id><project_id>794979</project_id><text_data>General Labor consists of installing and removing silt fence, using hand tools (such as shovels).Other Truck is a 1993 Ford w/ a GVW of 18,000 lbs that is fitted with a 1,000 gallon water tank licensed for roadway travel.</text_data><comment_date>2016-08-02T00:00:00</comment_date></row><row _id="row-y87i.sgp2-euav" _uuid="00000000-0000-0000-6CC9-7C873D41CE20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y87i.sgp2-euav"><intent_id>794999</intent_id><project_id>802026</project_id><text_data>TRUCK DRIVERS WILL BE HAULING RDC GARBAGE CONTAINERS.</text_data><comment_date>2016-10-10T00:00:00</comment_date></row><row _id="row-crfy.i75k.rq86" _uuid="00000000-0000-0000-AE68-CE9EB10A9405" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-crfy.i75k.rq86"><intent_id>647633</intent_id><project_id>740431</project_id><text_data>HEALTH &amp; SECURITY $5.25 PER HOURER401K  $1.00 PER HOURRETIREMENT- TRAINING FUND $6.33 PER HOURAPPRENTICE TRAINING FUND .54 PER HOUR</text_data><comment_date>2014-08-13T00:00:00</comment_date></row><row _id="row-25a8_7fsz.ypyz" _uuid="00000000-0000-0000-7461-D84585E70B3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-25a8_7fsz.ypyz"><intent_id>618536</intent_id><project_id>510578</project_id><text_data>Hydroseeding for beautification</text_data><comment_date>2014-03-04T00:00:00</comment_date></row><row _id="row-6sw8_mm4a~n7zp" _uuid="00000000-0000-0000-1601-D28C3A9BF3F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6sw8_mm4a~n7zp"><intent_id>576475</intent_id><project_id>713728</project_id><text_data>Response from Michael Hummel to Correction for Question No. 5 - Received by email 07/17/2013: 5. What specific tasks did your employees perform? Siemens� SES Technicians, perform their work strictly on laptop computers, both remotely and on-site during the commissioning process. While off-site, the SES Technicians update program configurations and point inputs. The SES Technician typically sits in at control panel and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the system is operating properly, the SES Technician trains the end-user about system functionality, again using a computer interface. Importantly, SES Technicians do not use trade tools, such as drills or wrenches.</text_data><comment_date>2013-07-26T00:00:00</comment_date></row><row _id="row-wtpx.kwhs.9v6e" _uuid="00000000-0000-0000-B253-5E1811FDB1A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wtpx.kwhs.9v6e"><intent_id>778788</intent_id><project_id>796910</project_id><text_data>JOB DETAILS: LABORER WILL BE CRACK SEALING USING AIR COMPRESSOR, CEMENT, WHEEL BARROW AND SHOVEL. WE WILL PROVIDE TEMPORARY TRAFFIC CONTROL,  ROADWAY STRIPING TO INCLUDE TYPE 3SL TRAFFIC ARROW PER WSDOT M-24.40-02</text_data><comment_date>2016-08-05T00:00:00</comment_date></row><row _id="row-wqb3~q6s6.dxbf" _uuid="00000000-0000-0000-B102-9986B8BD22C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wqb3~q6s6.dxbf"><intent_id>1141919</intent_id><project_id>960861</project_id><text_data>205362-002</text_data><comment_date>2021-05-04T00:00:00</comment_date></row><row _id="row-y8jx-in99.q9pm" _uuid="00000000-0000-0000-78DB-8FF04808F9F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8jx-in99.q9pm"><intent_id>1024698</intent_id><project_id>900936</project_id><text_data>PROGRAM NORSTAR PHONE SYSTEM PER REQUEST</text_data><comment_date>2019-12-03T00:00:00</comment_date></row><row _id="row-h36j~gczp_7yfm" _uuid="00000000-0000-0000-5061-EAB003DA6056" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h36j~gczp_7yfm"><intent_id>732500</intent_id><project_id>772950</project_id><text_data>045281</text_data><comment_date>2015-11-20T00:00:00</comment_date></row><row _id="row-ku47.259i-k6k2" _uuid="00000000-0000-0000-BE11-9EE92C417C67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ku47.259i-k6k2"><intent_id>510302</intent_id><project_id>686679</project_id><text_data>WORKERS COMP CARRIER - SAIF CORP, POLICY #947202WE DO NOT HAVE ANY EMPLOYEES THAT ARE RESIDENTS OF WASHINGTON</text_data><comment_date>2012-05-03T00:00:00</comment_date></row><row _id="row-h79g~rqx4-ndcn" _uuid="00000000-0000-0000-C4DA-9D86C2E52075" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h79g~rqx4-ndcn"><intent_id>551779</intent_id><project_id>702986</project_id><text_data>This project will consist of removal of small ornamental trees around the fire station. Equipment to be used will be chainsaws, buckets, rakes, and a backpack blower for the purpose of cleaning any debris generated from the work.</text_data><comment_date>2013-01-14T00:00:00</comment_date></row><row _id="row-refc_qsmu~srfv" _uuid="00000000-0000-0000-C525-C4D241BB6C24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-refc_qsmu~srfv"><intent_id>956195</intent_id><project_id>871252</project_id><text_data>From: Ziegert, Charles O (LNI) &amp;lt;ziec235@LNI.WA.GOV&amp;gt; Sent: Tuesday, August 27, 2019 4:49 PMTo: debbie@desertgreenllc.comSubject: Intent 956195 On CallGood afternoon,On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on--call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.aspThank you,Chuck ZiegertIndustrial Relations SpecialistCharles.Ziegert@lni.wa.govPrevailing WageDept of Labor and IndustriesPhone 360 902-4538Prevailing Wage 360 902-5335Prevailing Wage Information:http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp</text_data><comment_date>2019-08-27T00:00:00</comment_date></row><row _id="row-3kr9_nq7q~jgg7" _uuid="00000000-0000-0000-879F-D35F7C92574B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3kr9_nq7q~jgg7"><intent_id>696630</intent_id><project_id>715524</project_id><text_data>Form filed by:  Karin Wheeler</text_data><comment_date>2015-05-27T00:00:00</comment_date></row><row _id="row-ch86_r3j3-7b6y" _uuid="00000000-0000-0000-38DC-8CE9E8A3C51A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ch86_r3j3-7b6y"><intent_id>865348</intent_id><project_id>827093</project_id><text_data>THIS IS LANDSCAPING OF A PARKING LOT AND COURTYARD, WE WILL NOT BE INSTALLING ANY IRRIGATION,WE WILL USE BOBCAT SKID STEER LOADER TO SPREAD SOIL AND MINI TRACK HOE TO DIG TREE HOLES, THERE IS NO DRAINAGE ON PROJECT, JUST PLANTS TREES AND GROUNDCOVER AND MULCH</text_data><comment_date>2017-09-27T00:00:00</comment_date></row><row _id="row-frv6.tqdg_6629" _uuid="00000000-0000-0000-3639-DA7E88A36427" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-frv6.tqdg_6629"><intent_id>627172</intent_id><project_id>733936</project_id><text_data>Install Fertile Mulch into landscape areas.</text_data><comment_date>2014-04-29T00:00:00</comment_date></row><row _id="row-ticg~3fdz.9ncf" _uuid="00000000-0000-0000-A437-CAEE1E576C30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ticg~3fdz.9ncf"><intent_id>1132917</intent_id><project_id>956568</project_id><text_data>Project# 02996, Bennett, Mavis, 3512 N Barker Rd, Spokane Valley, WA 99027</text_data><comment_date>2021-04-06T00:00:00</comment_date></row><row _id="row-ifr5~8bge~fr49" _uuid="00000000-0000-0000-5AFD-AEDD5D443D16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ifr5~8bge~fr49"><intent_id>501293</intent_id><project_id>683092</project_id><text_data>Installing, servicing &amp; repairing irrigation sprinklers to a maximum depth of 3' below grade.  Tools used are rakes &amp; shovels.</text_data><comment_date>2012-02-22T00:00:00</comment_date></row><row _id="row-6iwf-bret_4bnu" _uuid="00000000-0000-0000-F97A-CFD67665BEAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6iwf-bret_4bnu"><intent_id>501580</intent_id><project_id>677952</project_id><text_data>spoke with accounting, they broke out pension etc for your request.Vacation 1.41 and 2.16 Pension 11.20 and 17.17Medical 1.50 and 2.29</text_data><comment_date>2012-03-07T00:00:00</comment_date></row><row _id="row-94zs.s85p~p99z" _uuid="00000000-0000-0000-4AE1-E5A32E80D7C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-94zs.s85p~p99z"><intent_id>589089</intent_id><project_id>718270</project_id><text_data>Filed by robert Coultas</text_data><comment_date>2014-02-19T00:00:00</comment_date></row><row _id="row-wrfc_rsv7-wmbd" _uuid="00000000-0000-0000-CF0D-EFF6B4BD198D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wrfc_rsv7-wmbd"><intent_id>1286843</intent_id><project_id>1042839</project_id><text_data>SA 11662 10/1/22 - 09/31/23 (9902026)</text_data><comment_date>2022-12-01T00:00:00</comment_date></row><row _id="row-gs5x_4paz-xf3k" _uuid="00000000-0000-0000-B59C-2EB72B341919" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gs5x_4paz-xf3k"><intent_id>995536</intent_id><project_id>888642</project_id><text_data>PROJECT IS EXEMPT FROM STATE PREVAILING WAGE REQUIREMENTS BASED ON THE HOUSING ACT OF 1937 AND 24 CFR 965,101.</text_data><comment_date>2019-07-30T00:00:00</comment_date></row><row _id="row-ms3v-u9ih.vnkj" _uuid="00000000-0000-0000-474A-DCA9A138E946" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ms3v-u9ih.vnkj"><intent_id>1168345</intent_id><project_id>974687</project_id><text_data>Job# S12848S</text_data><comment_date>2021-08-11T00:00:00</comment_date></row><row _id="row-zifp~mfmi_8cp3" _uuid="00000000-0000-0000-BE89-6BE36AE3EBEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zifp~mfmi_8cp3"><intent_id>1009225</intent_id><project_id>861129</project_id><text_data>Tymco 600 sweeper unit mounted on international or freightliner chassis</text_data><comment_date>2019-09-23T00:00:00</comment_date></row><row _id="row-d3st_ksas.2ici" _uuid="00000000-0000-0000-C3C8-AB5370AF5383" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d3st_ksas.2ici"><intent_id>636697</intent_id><project_id>736026</project_id><text_data>Installing temporary fence panels using blocks and clamps</text_data><comment_date>2014-06-23T00:00:00</comment_date></row><row _id="row-syvf.66f5-94rh" _uuid="00000000-0000-0000-6D27-B1513D7E2945" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-syvf.66f5-94rh"><intent_id>917332</intent_id><project_id>854510</project_id><text_data>No, No, Yes, No, No, No, No, No, No, No, No, Yes, Yes, No, No</text_data><comment_date>2018-07-11T00:00:00</comment_date></row><row _id="row-6z5h.wdwq_i86h" _uuid="00000000-0000-0000-B517-227E29FCDE94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6z5h.wdwq_i86h"><intent_id>1267869</intent_id><project_id>1030361</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-10-07T00:00:00</comment_date></row><row _id="row-z6rm~r892.dz5m" _uuid="00000000-0000-0000-6761-D24E811D7875" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z6rm~r892.dz5m"><intent_id>783140</intent_id><project_id>800082</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2016-08-17T00:00:00</comment_date></row><row _id="row-67sd_9itc_7gui" _uuid="00000000-0000-0000-AB73-175EBCEC3383" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-67sd_9itc_7gui"><intent_id>475346</intent_id><project_id>665154</project_id><text_data>ONE OF THE WORKERS IS AN OWNER/OPERATOR</text_data><comment_date>2011-08-30T00:00:00</comment_date></row><row _id="row-674n.5ryi.i4nm" _uuid="00000000-0000-0000-08B4-3A4028DA78E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-674n.5ryi.i4nm"><intent_id>693668</intent_id><project_id>761902</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2015-05-11T00:00:00</comment_date></row><row _id="row-y75a-whw2.ni99" _uuid="00000000-0000-0000-AE76-46F89941598C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y75a-whw2.ni99"><intent_id>1126962</intent_id><project_id>952897</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Laborer trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. Filed by Kathi ClarkBCI Project Number ES9040</text_data><comment_date>2021-03-06T00:00:00</comment_date></row><row _id="row-gyz5.6awe-hnbb" _uuid="00000000-0000-0000-EDAE-82A5D59B421C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gyz5.6awe-hnbb"><intent_id>1182308</intent_id><project_id>981823</project_id><text_data>#1- Electrical and Sheetmetal Venting for installation of Whole house bath fan, electrical repairs#2- single family residence#3- single story#4(a)- no#4(b)- no#4(c)- yes#4(d)- no#4(e)- no#4(f)- no#4(g)- no#4(h)- no#4(i)- no#4(j)- no#4(k)- no#4(l)- N/A#5- yes#6- yes#7- no#8- no</text_data><comment_date>2021-09-30T00:00:00</comment_date></row><row _id="row-5nhm_4b2m.umn4" _uuid="00000000-0000-0000-D9A0-EB35318BCAA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5nhm_4b2m.umn4"><intent_id>608192</intent_id><project_id>704635</project_id><text_data>Tiger Mountain Rental will send the invoice for this job.  Lakeridge Paving owns the employees.</text_data><comment_date>2013-12-12T00:00:00</comment_date></row><row _id="row-qyg7-7p5k-cbna" _uuid="00000000-0000-0000-AE2C-ADF9A2D1C486" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qyg7-7p5k-cbna"><intent_id>1388456</intent_id><project_id>1101525</project_id><text_data>121889-001</text_data><comment_date>2023-12-16T00:00:00</comment_date></row><row _id="row-rtbr.b8eq~q5ft" _uuid="00000000-0000-0000-1DE0-ECA0646CFD3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rtbr.b8eq~q5ft"><intent_id>739955</intent_id><project_id>774635</project_id><text_data>a) the entire portion of the project is beautification and landscape to 12510 33rd Ave NE - Seattleb) our portion of the project is to install hydroseed per specifications, to designated and prepared area using a hydroseed installation truck. Hydroseed is a one-step process.</text_data><comment_date>2016-01-04T00:00:00</comment_date></row><row _id="row-5bg6-c9rc_vx42" _uuid="00000000-0000-0000-AF7A-FBAE11AF7C36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bg6-c9rc_vx42"><intent_id>777965</intent_id><project_id>798142</project_id><text_data>Excavator and truck/trailer for completion and removal of debris</text_data><comment_date>2016-07-27T00:00:00</comment_date></row><row _id="row-sqew-wcdi-8a8n" _uuid="00000000-0000-0000-1EAE-A758D5860CE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqew-wcdi-8a8n"><intent_id>1126321</intent_id><project_id>950059</project_id><text_data>4) Unknown use, just working under general contractor on 6 houses4e) no</text_data><comment_date>2021-03-18T00:00:00</comment_date></row><row _id="row-73nv.egdi~apms" _uuid="00000000-0000-0000-0915-D6560532F1E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73nv.egdi~apms"><intent_id>878587</intent_id><project_id>836611</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2017-12-11T00:00:00</comment_date></row><row _id="row-afjk~h23m~vj8j" _uuid="00000000-0000-0000-FD53-1BD79232F586" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-afjk~h23m~vj8j"><intent_id>725869</intent_id><project_id>773820</project_id><text_data>Fringe Breakdown:$18.13---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $11.13$9.82----$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $2.82 Pension</text_data><comment_date>2015-10-12T00:00:00</comment_date></row><row _id="row-zvkj_y7zr_3jwt" _uuid="00000000-0000-0000-A983-A1396CD8D5DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zvkj_y7zr_3jwt"><intent_id>902189</intent_id><project_id>849768</project_id><text_data>Filed by Jesus Franco</text_data><comment_date>2018-05-02T00:00:00</comment_date></row><row _id="row-2vdu.yg69_8r84" _uuid="00000000-0000-0000-5577-31E5983FBDCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2vdu.yg69_8r84"><intent_id>1066445</intent_id><project_id>892381</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and 2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2020-06-19T00:00:00</comment_date></row><row _id="row-v36b_s9j9_tr4t" _uuid="00000000-0000-0000-59C3-50A4D39409ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v36b_s9j9_tr4t"><intent_id>642461</intent_id><project_id>719338</project_id><text_data>Form filed by: Lauren DireProject is exempt from State Prevailing Wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2014-07-21T00:00:00</comment_date></row><row _id="row-5a47_yd5x~rw2f" _uuid="00000000-0000-0000-D00C-299378892EB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5a47_yd5x~rw2f"><intent_id>943450</intent_id><project_id>865552</project_id><text_data>Job Order Contract (JOC)  Construction Services for Facilities Maintenance and OperationsContract No. RTA/CN 0164-15Work Order No.  047 - CCE 73470-0058</text_data><comment_date>2018-11-01T00:00:00</comment_date></row><row _id="row-p8rg.g72i_9zcp" _uuid="00000000-0000-0000-3C99-AAB60FCF0FF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p8rg.g72i_9zcp"><intent_id>780179</intent_id><project_id>797164</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY. JOB DETAILS:  CRACK SEALING,STRIPING, REMOVE PROTECT AND REINSTALL STREET SIGNS AND DIG POST HOLES. LABORER WILL DIG POST HOLES USING SHOVEL, CRACK SEAL USING MIXER, WHEEL BARROW, AND SHOVEL.</text_data><comment_date>2016-08-05T00:00:00</comment_date></row><row _id="row-57pk_bivi.yjw3" _uuid="00000000-0000-0000-D146-9791A89B8A0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-57pk_bivi.yjw3"><intent_id>1123054</intent_id><project_id>950962</project_id><text_data>121599858129</text_data><comment_date>2021-02-17T00:00:00</comment_date></row><row _id="row-sycs~pphv-zi9k" _uuid="00000000-0000-0000-A259-2EAB80CC23DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sycs~pphv-zi9k"><intent_id>1235892</intent_id><project_id>972666</project_id><text_data>Project is an addition to the middle school.  Our scope of work is to hydroseed lawn areas using a 75hp Bowie Hydroseeder.</text_data><comment_date>2022-05-24T00:00:00</comment_date></row><row _id="row-v8px_k8xi-ht6v" _uuid="00000000-0000-0000-0ABE-99CC797E918D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8px_k8xi-ht6v"><intent_id>1165055</intent_id><project_id>971542</project_id><text_data>We are a subcontractor for FieldTurf. They have been hired to improve the athletic surfaces at Hazen High School.  We are going to:Supply and maintain temporary fencing per plan for the duration of the project. Install temporary catch basin protection. Remove all fence fabric and reinstall after paving is complete.Remove and replace fence posts as needed for access and paving.Remove existing tennis equipment and foundations.Remove existing wooden retaining wall. Excavate, prep and install concrete wall per plan. Restore disturbed area. Sawcut around perimeter fence posts, demo and remove existing asphalt. Import base rock as needed up to 1�. Grade as close as possible to 1% single plane slope across playing areas.  Meet and match existing edge conditions.  Compact base and pave 3� of 3/8� HMAC in 2 lifts.Flood test paving before any further work commences.   Provide and install 4 complete sets of Douglas tennis equipment. Pressure wash existing concrete wall.Provide and install Plexipave 5 coat acrylic surface system with striping.Our crew uses tools like a power washer, shovels, rakes, brooks and wheelbarrows to move the rubber. We also use scissors and tape for masking areas to keep the other surfaces clean.</text_data><comment_date>2021-07-30T00:00:00</comment_date></row><row _id="row-2dbs~fb3w.pi76" _uuid="00000000-0000-0000-9C8D-F22F82AB1295" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2dbs~fb3w.pi76"><intent_id>456773</intent_id><project_id>665722</project_id><text_data>Installation of 4&amp;quot; - 6&amp;quot; topsoil, Seeded Lawn installation</text_data><comment_date>2011-05-19T00:00:00</comment_date></row><row _id="row-xuec_dgci.2ic5" _uuid="00000000-0000-0000-29C4-5020F9F22FCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xuec_dgci.2ic5"><intent_id>1085578</intent_id><project_id>907410</project_id><text_data>BCR Job # PR24416</text_data><comment_date>2020-09-02T00:00:00</comment_date></row><row _id="row-suvp~wp28.j299" _uuid="00000000-0000-0000-073A-8CA231D6454D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-suvp~wp28.j299"><intent_id>577144</intent_id><project_id>714004</project_id><text_data>State of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- Kent SD Meridian ElementaryPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you Claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.)	What is the purpose of this project?Update the security alarm system and access controls for all Kent School District schools and administrative building.2.)	Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)]No.3.)	Does this project entail the remodeling or new construction of a facility?No. 4.)	If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.Burglar alarm system.5.)	What specific tasks will your employees use in the performance of those tasks?Siemens� SES Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the SES Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The SES Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the SES Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, SES Technicians do not use trade tools, such as drills or wrenches.  6.)	What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.)	If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.)	Are you going to be hiring any subcontractors for this project?Yes. To expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves.</text_data><comment_date>2013-06-24T00:00:00</comment_date></row><row _id="row-7v2x.xcds-h527" _uuid="00000000-0000-0000-A66D-6810827146B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7v2x.xcds-h527"><intent_id>832349</intent_id><project_id>820128</project_id><text_data>Surface running track</text_data><comment_date>2017-05-11T00:00:00</comment_date></row><row _id="row-rvtu.kpvm-n9px" _uuid="00000000-0000-0000-0E93-57BBCB608E37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rvtu.kpvm-n9px"><intent_id>586164</intent_id><project_id>717242</project_id><text_data>THIS INTENT IS BEING FILED TO REPLACE INTENT ID # 578020.  # 578020 WAS FILED WITH ERRORS.  ERRORS WERE NOT IDENTIFIED UNTIL AFTER INTENT WAS ALREADY APPROVED.  ALL BRIGHT WINDOW CLEANING WILL CALL REQUESTING DELETION OF #578020 AFTER THIS NEW INTENT HAS BEEN APPROVED.</text_data><comment_date>2013-08-07T00:00:00</comment_date></row><row _id="row-ajhh.c86r_qfzd" _uuid="00000000-0000-0000-A0C0-66680771C764" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ajhh.c86r_qfzd"><intent_id>499478</intent_id><project_id>682362</project_id><text_data>ALLIED'S JOB # 120202-0121.419</text_data><comment_date>2012-02-07T00:00:00</comment_date></row><row _id="row-hq2z~34xs.hnk9" _uuid="00000000-0000-0000-5D16-CDF2C2FB17A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hq2z~34xs.hnk9"><intent_id>1261043</intent_id><project_id>929369</project_id><text_data>Contracted Amount $44,284.00</text_data><comment_date>2022-12-19T00:00:00</comment_date></row><row _id="row-w3eg~26jq.pa65" _uuid="00000000-0000-0000-811B-FC41F146B535" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w3eg~26jq.pa65"><intent_id>484967</intent_id><project_id>591195</project_id><text_data>Customer brought material to our shop.  Work was done inside our shop.</text_data><comment_date>2011-10-21T00:00:00</comment_date></row><row _id="row-wavg~iwg6.tm8i" _uuid="00000000-0000-0000-6A36-72AD0FC2F4E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wavg~iwg6.tm8i"><intent_id>1060057</intent_id><project_id>880450</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2020-05-22T00:00:00</comment_date></row><row _id="row-n949_pyen_mrn7" _uuid="00000000-0000-0000-86E3-643AF9DCFBDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n949_pyen_mrn7"><intent_id>1065604</intent_id><project_id>904262</project_id><text_data>order A47759/A47769</text_data><comment_date>2020-06-16T00:00:00</comment_date></row><row _id="row-4w8n_vurp~w2f6" _uuid="00000000-0000-0000-046B-97E4CA4A8E7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4w8n_vurp~w2f6"><intent_id>1202317</intent_id><project_id>993671</project_id><text_data>10133 2022 agreement</text_data><comment_date>2022-01-03T00:00:00</comment_date></row><row _id="row-6gh4_2mfn_wjk2" _uuid="00000000-0000-0000-E3E8-F486342DEA53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6gh4_2mfn_wjk2"><intent_id>869515</intent_id><project_id>833153</project_id><text_data>PEO - Medical $9.79 Vacation and Holiday $1.37General Laborer -  Medical $1.99 Vacation and Holiday $1.54</text_data><comment_date>2017-10-17T00:00:00</comment_date></row><row _id="row-re66_i6t7~tgjp" _uuid="00000000-0000-0000-8700-0A4748D080D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-re66_i6t7~tgjp"><intent_id>926934</intent_id><project_id>856016</project_id><text_data>Bubb 1801 Mckenzie Ave 98225</text_data><comment_date>2018-08-20T00:00:00</comment_date></row><row _id="row-aten-9br8~sfnf" _uuid="00000000-0000-0000-BE13-DAB3A2D0DCFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aten-9br8~sfnf"><intent_id>631700</intent_id><project_id>734775</project_id><text_data>WE WILL INSTALL IRRIGATION IN THE NEW LAWN AREA ONLY.   WE WILL PLANT NEW SHRUBS AT THE DRIVEWAY ISLANDS AND PUT TOPSOIL IN NEW POTS AND PLANT THE POTS</text_data><comment_date>2014-05-28T00:00:00</comment_date></row><row _id="row-ps27~kday-axgj" _uuid="00000000-0000-0000-D308-6A17A33E905A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ps27~kday-axgj"><intent_id>676544</intent_id><project_id>754506</project_id><text_data>TELECOMMUNICATION TECHNICIANS WORK DESCRIPTIONProvide and install network and telephone cable between instruments, terminals and sets and the connections to the distribution cable.Provide and install Blocks and Subpanels where large feed cables terminate at the distribution frames in the IDF or MDFProvide and install riser cables between floors from the MDF to the IDFLabel and test the cableINDOOR INSTALLATION</text_data><comment_date>2015-01-27T00:00:00</comment_date></row><row _id="row-sae2-q4pt_k8ai" _uuid="00000000-0000-0000-27A0-D27B39C1462C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sae2-q4pt_k8ai"><intent_id>614297</intent_id><project_id>719338</project_id><text_data>Filed by Cindi McCaffery</text_data><comment_date>2014-01-30T00:00:00</comment_date></row><row _id="row-dgz7~chdj.5677" _uuid="00000000-0000-0000-6446-23CFA8641550" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgz7~chdj.5677"><intent_id>899674</intent_id><project_id>848836</project_id><text_data>Prime Contractor requested 2nd intent corection. Their new Intent is now 899784.</text_data><comment_date>2018-04-23T00:00:00</comment_date></row><row _id="row-rizs.zu5n~42kp" _uuid="00000000-0000-0000-7897-56CE673E26CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rizs.zu5n~42kp"><intent_id>828445</intent_id><project_id>818876</project_id><text_data>1)We were contracted to repair the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-04-24T00:00:00</comment_date></row><row _id="row-8qzg.sxze~9ehs" _uuid="00000000-0000-0000-4402-47EA737AB777" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8qzg.sxze~9ehs"><intent_id>1219010</intent_id><project_id>880614</project_id><text_data>This is what we paid our workers for this job. The reported hours are accurate. Thank you!</text_data><comment_date>2022-04-11T00:00:00</comment_date></row><row _id="row-sqby~bf2p.s4jz" _uuid="00000000-0000-0000-EA4B-3D5B1ED441FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqby~bf2p.s4jz"><intent_id>905989</intent_id><project_id>849219</project_id><text_data>Fringe BreakdownLABORERS:  $12.15H &amp; W   = $6.20Pension = $5.25Training= $0.60Trust     = $0.10OPERATORS:  $15.15H &amp; W   = $6.95Pension = $7.55Training= $0.65TEAMSTERS:  $17.30H &amp; W   = $10.30Pension = $6.60Training= $0.40</text_data><comment_date>2018-05-21T00:00:00</comment_date></row><row _id="row-9iaa.g4xw_uddr" _uuid="00000000-0000-0000-EA16-EA2A384EF30E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9iaa.g4xw_uddr"><intent_id>1138080</intent_id><project_id>913036</project_id><text_data>26AC1122</text_data><comment_date>2021-04-22T00:00:00</comment_date></row><row _id="row-njsp~dq3t_kxzg" _uuid="00000000-0000-0000-FBAB-009553332606" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-njsp~dq3t_kxzg"><intent_id>1167650</intent_id><project_id>974350</project_id><text_data>WO7242</text_data><comment_date>2021-08-10T00:00:00</comment_date></row><row _id="row-da62-7sv3_vkbk" _uuid="00000000-0000-0000-8A3B-CA0D0361C608" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-da62-7sv3_vkbk"><intent_id>1518263</intent_id><project_id>1122755</project_id><text_data>General laborer is hand work only (no power tools or equipment) $38.18 base + $9.54 pensionMotor Patrol Grader grades the project before paving operations #$64.02 base + $16.00 pensionOther trucks consists of a 0 to 8000 gallon water truck used to help with compaction and dust control $47.23 base + $11.81 pension</text_data><comment_date>2025-03-16T00:00:00</comment_date></row><row _id="row-29j3~idbj~49cz" _uuid="00000000-0000-0000-93FC-F5353D771FAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-29j3~idbj~49cz"><intent_id>1145231</intent_id><project_id>940065</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project?  The WSU Spokane WSU HERB Cooling Tower Replacement Project will replace the existing cooling tower with two new fluid coolers. Project will include the removal of the existing tower, condenser pumps, piping and foundations. Project will also include all associated concrete foundations, piping, controls, pumps, water treatment system, valving, mechanical/electrical systems and associated fencing replacement required for the installation of the cooling towers and associated mechanical improvements.                    2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?    No   3. Does this project entail the remodeling or new construction of a facility?  No.      4. If your firm is working upon a type of building system, what type of system is involved? HVAC Controls.        5. When is your Work to be completed?     During the project6. What specific tasks did your employees perform?     BAU: Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.          7. What, if any, tools did your employees use in the performance of those tasks?     Laptop computer.      8. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks?    No � none.      9. Are you going to be hiring any subcontractors for this project?     Yes.</text_data><comment_date>2021-05-17T00:00:00</comment_date></row><row _id="row-e7p8.5v5k_kd6r" _uuid="00000000-0000-0000-4A16-BBE571B2816F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e7p8.5v5k_kd6r"><intent_id>1059370</intent_id><project_id>837504</project_id><text_data>Rough FramingOther residential structure1 storyhousingnonoyesnononononononoyesyesyesyesno</text_data><comment_date>2020-05-20T00:00:00</comment_date></row><row _id="row-q48k-5q7m_neyi" _uuid="00000000-0000-0000-2B86-B6D517993C94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q48k-5q7m_neyi"><intent_id>1006432</intent_id><project_id>876147</project_id><text_data>We will fill track with top soil, roll ruts and over seed tracks.</text_data><comment_date>2019-09-11T00:00:00</comment_date></row><row _id="row-gpik~jpwp~4fmr" _uuid="00000000-0000-0000-B401-B9C3673DF3A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gpik~jpwp~4fmr"><intent_id>839294</intent_id><project_id>819456</project_id><text_data>WE ARE OWNED BY THE NISQUALLY INDIAN TRIBE, WE HAVE INSURANCE THROUGH TRIBAL FIRST</text_data><comment_date>2017-06-08T00:00:00</comment_date></row><row _id="row-52n2_j5av.ijdp" _uuid="00000000-0000-0000-AD63-606B1E75359D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-52n2_j5av.ijdp"><intent_id>589153</intent_id><project_id>710745</project_id><text_data>3-story residential apartment complex for senior living</text_data><comment_date>2013-08-21T00:00:00</comment_date></row><row _id="row-wzn6_dwp5.c7rr" _uuid="00000000-0000-0000-255B-62A889450A75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wzn6_dwp5.c7rr"><intent_id>1064514</intent_id><project_id>922047</project_id><text_data>9848690</text_data><comment_date>2020-06-11T00:00:00</comment_date></row><row _id="row-yfnv_7yyj-fp5a" _uuid="00000000-0000-0000-0A1D-C3A476D550F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yfnv_7yyj-fp5a"><intent_id>755146</intent_id><project_id>788949</project_id><text_data>The purpose of this job is to demolish the house (approx. 780 sf) and shed (approx. 400 sf) and remove all debri.House is from the OSO Landslide in March 2014.</text_data><comment_date>2016-04-06T00:00:00</comment_date></row><row _id="row-pnqx-tcjj.jfqw" _uuid="00000000-0000-0000-92CF-787F82DA72EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pnqx-tcjj.jfqw"><intent_id>1137983</intent_id><project_id>957410</project_id><comment_date>2021-04-22T00:00:00</comment_date></row><row _id="row-zhvt.bc3q.bdkn" _uuid="00000000-0000-0000-93F7-26386502EECD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhvt.bc3q.bdkn"><intent_id>584192</intent_id><project_id>715911</project_id><text_data>Filed by Jose Guerrero</text_data><comment_date>2013-07-30T00:00:00</comment_date></row><row _id="row-ftx3_m8ef.tunk" _uuid="00000000-0000-0000-60C0-59B4B83BBEF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ftx3_m8ef.tunk"><intent_id>649114</intent_id><project_id>724927</project_id><text_data>Form filed by: Nathan Stout</text_data><comment_date>2014-08-19T00:00:00</comment_date></row><row _id="row-96gg_ngnf~qdtu" _uuid="00000000-0000-0000-A95C-6B06381FE99D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96gg_ngnf~qdtu"><intent_id>1181293</intent_id><project_id>981295</project_id><text_data>Regular grounds landscape maintenance, rake and weed beds, mow lawn, prune shrubs using hand tools and single axle truck</text_data><comment_date>2021-09-28T00:00:00</comment_date></row><row _id="row-m9jv_n662_z33y" _uuid="00000000-0000-0000-0207-8B40AA5963A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m9jv_n662_z33y"><intent_id>1238355</intent_id><project_id>1015981</project_id><text_data>Landscaping scope of work includes adding a drainage swale with plants and rocks, Importing topsoil and placing to a 4' depth, placing sod, installing a new irrigation system.</text_data><comment_date>2022-06-02T00:00:00</comment_date></row><row _id="row-88kq~feaz_tkgf" _uuid="00000000-0000-0000-A853-4083B926F9E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-88kq~feaz_tkgf"><intent_id>861560</intent_id><project_id>828868</project_id><text_data>We have workers comp insurance in Oregon with liberty mutual</text_data><comment_date>2017-09-08T00:00:00</comment_date></row><row _id="row-4hm5-7mph-qdjy" _uuid="00000000-0000-0000-0CFE-0100C7C6229D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4hm5-7mph-qdjy"><intent_id>597532</intent_id><project_id>712753</project_id><text_data>This note is for BP 202</text_data><comment_date>2013-10-03T00:00:00</comment_date></row><row _id="row-fxyn~px3x~mzph" _uuid="00000000-0000-0000-C9ED-B17EDE178F36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fxyn~px3x~mzph"><intent_id>644536</intent_id><project_id>732118</project_id><text_data>Truck Driver: Water Tank Truck (0-3000) gallons. Purpose: Dust control.</text_data><comment_date>2014-07-30T00:00:00</comment_date></row><row _id="row-fvch.qsgp~3mkn" _uuid="00000000-0000-0000-35DD-1469FA0E61CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fvch.qsgp~3mkn"><intent_id>1274203</intent_id><project_id>1031943</project_id><text_data>1. Replace bath fans &amp; switches2. Single Family Dwelling3. 14. a. No; b. No; c. Yes; d. No; e. No; f. No; g. No; h. No; i. No; j. No; k. No; l. No5. Yes6. Yes7. No8. No</text_data><comment_date>2022-10-12T00:00:00</comment_date></row><row _id="row-6fv6~5cpd.5ptp" _uuid="00000000-0000-0000-D9C6-B3288E70ECF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6fv6~5cpd.5ptp"><intent_id>876953</intent_id><project_id>824628</project_id><text_data>GU Job #17347Truck Driver:  Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2017-12-12T00:00:00</comment_date></row><row _id="row-b94b-995t.jcyw" _uuid="00000000-0000-0000-AF03-74DB764BC73B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b94b-995t.jcyw"><intent_id>950925</intent_id><project_id>864617</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2018-12-14T00:00:00</comment_date></row><row _id="row-yg5x_aepu~vrf7" _uuid="00000000-0000-0000-C3C0-97350C423DF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yg5x_aepu~vrf7"><intent_id>1290245</intent_id><project_id>998750</project_id><text_data>Job #45359-4</text_data><comment_date>2022-12-15T00:00:00</comment_date></row><row _id="row-vy3b~tsh7_yk42" _uuid="00000000-0000-0000-36CD-427711A01B94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vy3b~tsh7_yk42"><intent_id>789365</intent_id><project_id>802490</project_id><text_data>Install power 208V receptacles, install equipment. ( 1161842)</text_data><comment_date>2016-09-14T00:00:00</comment_date></row><row _id="row-a6wu~evkw-xujk" _uuid="00000000-0000-0000-FE55-9249367D826D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a6wu~evkw-xujk"><intent_id>1132217</intent_id><project_id>956160</project_id><text_data>SR 48619058 &amp; 48608078</text_data><comment_date>2021-03-29T00:00:00</comment_date></row><row _id="row-ucre~tmia_32cw" _uuid="00000000-0000-0000-74F7-7985A022A412" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ucre~tmia_32cw"><intent_id>468227</intent_id><project_id>668053</project_id><text_data>Landscape and beautification of 228th St. SE with plants, trees, shrubs. Seeding and erosion control as needed.1. Use of back pack sprayers for application of herbicide.2. Compost placement in designated planting areas.3. Planting ground cover, trees, and shrubs.4. Application of bark mulch around newly planted vegetation.5. Lay a biodegradable straw erosion control blanket and some hydroseeding.6. Maintenance of newly planted areas for weed control with use of back pack sprayers.Tools to be used: 45hp skiddster/mini excavator for picking up and moving bark mulch and compost, shovels, rakes, and back pack sprayers for application of chemicals.</text_data><comment_date>2011-07-26T00:00:00</comment_date></row><row _id="row-df96-9edf~gj3p" _uuid="00000000-0000-0000-B6F8-E2068A22257A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-df96-9edf~gj3p"><intent_id>510295</intent_id><project_id>686990</project_id><text_data>Clean up bio spill in bathroomGeneral Laborer to clean spill using broom, shovel and small hand tools</text_data><comment_date>2012-05-03T00:00:00</comment_date></row><row _id="row-6xjb_9usd.qzpf" _uuid="00000000-0000-0000-6D84-104E025488FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xjb_9usd.qzpf"><intent_id>670062</intent_id><project_id>750879</project_id><text_data>Start date will be given on January 5, 2015 by Awarding Agency</text_data><comment_date>2014-12-16T00:00:00</comment_date></row><row _id="row-cwt8~5xqv-jprp" _uuid="00000000-0000-0000-6A70-E057544C5888" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cwt8~5xqv-jprp"><intent_id>810585</intent_id><project_id>804137</project_id><text_data>Filed by Tom Rogers</text_data><comment_date>2017-01-10T00:00:00</comment_date></row><row _id="row-bgpa-48je_y2ng" _uuid="00000000-0000-0000-78C1-42ECF51F49D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bgpa-48je_y2ng"><intent_id>1203123</intent_id><project_id>994228</project_id><text_data>Fringe TBD dependent on which employees work on this job.</text_data><comment_date>2022-01-06T00:00:00</comment_date></row><row _id="row-kwxz-t7d3~5kpt" _uuid="00000000-0000-0000-6D61-9684ABC03C65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kwxz-t7d3~5kpt"><intent_id>947544</intent_id><project_id>865181</project_id><text_data>0718085</text_data><comment_date>2018-11-27T00:00:00</comment_date></row><row _id="row-ihzb_mhm2-46if" _uuid="00000000-0000-0000-7D24-8CDA2D370CA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihzb_mhm2-46if"><intent_id>936592</intent_id><project_id>862829</project_id><text_data>wo #8042724</text_data><comment_date>2018-10-01T00:00:00</comment_date></row><row _id="row-j8f8_kk7q_bneq" _uuid="00000000-0000-0000-DB28-59CFDE2BF21E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j8f8_kk7q_bneq"><intent_id>1179281</intent_id><project_id>980223</project_id><text_data>Q2 is now paid. Please approve.</text_data><comment_date>2021-10-28T00:00:00</comment_date></row><row _id="row-72pf.88jz.weex" _uuid="00000000-0000-0000-6916-4FC76CBC744F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-72pf.88jz.weex"><intent_id>1172339</intent_id><project_id>976650</project_id><text_data>$3.77 Medical, $1.05 Vacation, $.53 Holiday</text_data><comment_date>2021-08-25T00:00:00</comment_date></row><row _id="row-69dv_7ktt_i8rx" _uuid="00000000-0000-0000-3E1E-56D0F2FA9F2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-69dv_7ktt_i8rx"><intent_id>1020005</intent_id><project_id>893818</project_id><text_data>Work Location: 3823 172nd St NE, Arlington, WA  98223  Work will be performed indoors.  Work consists of installing voice and data cabling to support telephones and computers.</text_data><comment_date>2019-11-20T00:00:00</comment_date></row><row _id="row-i6fb.ftd2-3275" _uuid="00000000-0000-0000-D42C-3542E4891DBC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i6fb.ftd2-3275"><intent_id>766929</intent_id><project_id>793929</project_id><text_data>Re-filing as work was done in Chelan County not Douglas county</text_data><comment_date>2016-06-08T00:00:00</comment_date></row><row _id="row-edaw_n5pz_nunz" _uuid="00000000-0000-0000-F58B-4F2E68E6DCE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-edaw_n5pz_nunz"><intent_id>809866</intent_id><project_id>810609</project_id><text_data>This is my first Prevailing wage job. I&amp;#39;m sorry I didn&amp;#39;t file my intent in time. Please know my accountant is keeping track of everything, and my guys are getting their prevailing wage as their supposed to.Rob Lawrence President</text_data><comment_date>2017-01-05T00:00:00</comment_date></row><row _id="row-aua2.xi7h.a623" _uuid="00000000-0000-0000-5971-52C52B28E237" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aua2.xi7h.a623"><intent_id>809296</intent_id><project_id>809303</project_id><text_data>Other trucks: LowboyGeneral Laborer: Hand shovel</text_data><comment_date>2016-12-30T00:00:00</comment_date></row><row _id="row-85yd-d4s9.fuux" _uuid="00000000-0000-0000-1AD9-4EFA5EED0167" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-85yd-d4s9.fuux"><intent_id>638984</intent_id><project_id>738554</project_id><text_data>ON CALL REPAIR AND MAINTENANCE CONTRACTS FOR YEAR 7/1/2014 ENDING 6/30/2015</text_data><comment_date>2014-07-03T00:00:00</comment_date></row><row _id="row-g8nq-m85a_8q2s" _uuid="00000000-0000-0000-2F4E-72DCC64CFA49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8nq-m85a_8q2s"><intent_id>1106508</intent_id><project_id>885464</project_id><text_data>Work Order# 7154</text_data><comment_date>2020-12-01T00:00:00</comment_date></row><row _id="row-j6gq-xz4b~bx9h" _uuid="00000000-0000-0000-EFB9-5C6F89196356" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j6gq-xz4b~bx9h"><intent_id>1465451</intent_id><project_id>1113940</project_id><text_data>Installation of landscape and irrigation system for the new parking lot at the Kent East Hill Operations Center.  Irrigation lines to be installed 12-18 inches below grade.  Install of fine compost, topsoil, and bark mulch for the beautification of this parking lot.  All installation shall be by small tools and equipment less than 35 CC for minexcavators and front end loaders.  Maintenance of the area for 1 year.</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-8u2n.hwbv-s5qj" _uuid="00000000-0000-0000-A1FC-307F65767141" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8u2n.hwbv-s5qj"><intent_id>1139495</intent_id><project_id>959617</project_id><text_data>2/3/21 Compactor arrived at shop; technician removed inspection cover and evaluated unit. Tested unit with our power unit, ran ram forward and cut rear pins. Found a lot of oil in charge box. Reattached cylinders a bit to move them side to side. Disconnected hose, crawled in and cut front pins. Retracted and reset unit. Tech got cylinders out, put on pallet. Cleared up charge box. Opened dump door, 100-150 gallons of water came out. Door seal is good and does not need to be replaced. A lot of oil in water that came out. Sprayed down area with degreaser, sprayed off door seal and closed up compactor. Moved unit back to the yard. Strapped cylinders to pallet. Industrial Hydraulic will pick up and assess cylinders.3/8/21 Removed old hoses and made new ones. Got cylinder pins and stickers removed.3/9/21 Technician made (2) more hoses and installed them. Obtained (2) rebuilt cylinders, installed cylinders and pins. Bolted pins down and installed hoses. Zip tied longer hoses to cylinders to alleviate any pinch points. Tested functions of unit, no leaks present. Reinstalled original quick disconnects and installed inspection cover. Compactor picked up and returned back to customer.3/16/21 Technician arrived on site and Purged and replaced hydraulic oil, added (15) gallons of hydraulic oil. Tested function of, running correctly. The interlock wires were not connected in the main control box, tech connected the interlock wires. Lubricated the hinges and drag plate guides.</text_data><comment_date>2021-04-26T00:00:00</comment_date></row><row _id="row-248b-356v-7x7n" _uuid="00000000-0000-0000-D57C-C33D8B269321" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-248b-356v-7x7n"><intent_id>796528</intent_id><project_id>802437</project_id><text_data>Job #16201</text_data><comment_date>2016-10-18T00:00:00</comment_date></row><row _id="row-ym78.azr7_eedg" _uuid="00000000-0000-0000-FBA7-4BB3AF667399" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ym78.azr7_eedg"><intent_id>826005</intent_id><project_id>798906</project_id><text_data>Wildlands will be hydroseeding new grasses.</text_data><comment_date>2017-04-11T00:00:00</comment_date></row><row _id="row-gia9.xmaj~swwi" _uuid="00000000-0000-0000-F3BB-B0A78C60904B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gia9.xmaj~swwi"><intent_id>1096705</intent_id><project_id>936663</project_id><text_data>619758801 Ambulance Garage - FACP</text_data><comment_date>2020-10-16T00:00:00</comment_date></row><row _id="row-ythj~cet8-b9tv" _uuid="00000000-0000-0000-387C-8900E11E3937" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ythj~cet8-b9tv"><intent_id>821538</intent_id><project_id>815979</project_id><text_data>302474</text_data><comment_date>2017-03-20T00:00:00</comment_date></row><row _id="row-tn5z_xwj8~gi3y" _uuid="00000000-0000-0000-A744-D30F0CF6A692" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tn5z_xwj8~gi3y"><intent_id>1125236</intent_id><project_id>940213</project_id><text_data>Wilson Concrete Hired us</text_data><comment_date>2021-02-26T00:00:00</comment_date></row><row _id="row-yrzn.3npp~arzv" _uuid="00000000-0000-0000-3383-A4542D82DE89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yrzn.3npp~arzv"><intent_id>938107</intent_id><project_id>863382</project_id><text_data>Project dates begin after new &amp;quot;Laborer/nozzleman&amp;quot; wage rate takes effect August 31st ($49.81 per hour straight time)</text_data><comment_date>2018-10-07T00:00:00</comment_date></row><row _id="row-ngv2_xc5q_zcjz" _uuid="00000000-0000-0000-1387-092054D37E1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ngv2_xc5q_zcjz"><intent_id>1045253</intent_id><project_id>888245</project_id><text_data>This project is federally funded &amp; also subject to Davis Bacon wages, the contractor is paying the higher of the two wage rates.#1 Install &amp; Dismantle Scaffold #2 Apartments#3 5#4 a. No b. No c. Yes d. No e. No f. No g. No h. No i. No j. No k. yes l. #5 Yes#6 Yes#7 unknown#8 unknown</text_data><comment_date>2020-03-13T00:00:00</comment_date></row><row _id="row-ejwt.6u4u~9fwy" _uuid="00000000-0000-0000-BFC8-592259A8078B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ejwt.6u4u~9fwy"><intent_id>1174359</intent_id><project_id>954724</project_id><text_data>Nordvind job# 2021-08TRUCKS - lowboy delivers asphalt rotomill to jobsite</text_data><comment_date>2021-09-01T00:00:00</comment_date></row><row _id="row-r42d~kpxn_982u" _uuid="00000000-0000-0000-4050-40087D81C8A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r42d~kpxn_982u"><intent_id>974521</intent_id><project_id>877242</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR AND WATER TRUCK</text_data><comment_date>2019-05-01T00:00:00</comment_date></row><row _id="row-fyba~pf2j~tbca" _uuid="00000000-0000-0000-D722-0D60B2627A7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fyba~pf2j~tbca"><intent_id>955415</intent_id><project_id>870901</project_id><text_data>This is year 1 of a 2 year Landscape Maintenance Contract for multiple sites in the city of Bellevue, King county.  The work will consist of mowing, trimming, weeding, edging, leaf fall and litter removal, raking, blowing with a backpack blower for clean up, bed care, and pruning.  Equipment to be used will include walk behind mowers, weedeaters,edgers,  pruning shears, rakes, shovels, hoes, and a backpack blower for clean up as required to complete the maintenance of the established planting and turf areas for these sites.  Work will begin January 1, 2019 and go through 12/31/2019.  An intent and affidavit will be filed for each year of the contract.</text_data><comment_date>2019-01-16T00:00:00</comment_date></row><row _id="row-5qiw-8nnv.x8ew" _uuid="00000000-0000-0000-353A-A98B944B65D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5qiw-8nnv.x8ew"><intent_id>1157216</intent_id><project_id>969092</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 5e for voice (telephone) and/or data (computer networking) indoors. POWERCOM JOB# 421083</text_data><comment_date>2021-07-01T00:00:00</comment_date></row><row _id="row-s39b-jijm~thp8" _uuid="00000000-0000-0000-B800-612E3FBA00DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s39b-jijm~thp8"><intent_id>592045</intent_id><project_id>717987</project_id><text_data>Landscape construction - Truck Driver will be driving a 3000 gal truck mounted hydroseeder</text_data><comment_date>2013-09-05T00:00:00</comment_date></row><row _id="row-587m~pwnw-7h27" _uuid="00000000-0000-0000-1E8B-11B68CF06CDB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-587m~pwnw-7h27"><intent_id>1231984</intent_id><project_id>1012235</project_id><text_data>9889905</text_data><comment_date>2022-05-09T00:00:00</comment_date></row><row _id="row-tb8q~pgcc-auh7" _uuid="00000000-0000-0000-232A-AA3C9573A799" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tb8q~pgcc-auh7"><intent_id>563839</intent_id><project_id>708483</project_id><text_data>Al-Mahana - 33rd Avenue SE, EverettGilbert - 20th Avenue SE, BothellSorensen - Airport Way, SnohomishLovato - 66th Avenue W., Lynnwood</text_data><comment_date>2013-04-09T00:00:00</comment_date></row><row _id="row-7qft-v27n-j6jt" _uuid="00000000-0000-0000-C31B-48DF875E7F0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7qft-v27n-j6jt"><intent_id>586152</intent_id><project_id>717237</project_id><text_data>Warbus 2568 MacKenzie Rd 98226</text_data><comment_date>2013-08-07T00:00:00</comment_date></row><row _id="row-3ybs.weqz.zjs3" _uuid="00000000-0000-0000-7D98-6406A9403B05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ybs.weqz.zjs3"><intent_id>984159</intent_id><project_id>881099</project_id><text_data>Our soil samples are collected by the contractor and put in our truck for laboratory testing.   Krazan does not perform �work� on site only inspections</text_data><comment_date>2019-07-08T00:00:00</comment_date></row><row _id="row-fiz4_5gnk.db4g" _uuid="00000000-0000-0000-D70A-715461EE206A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fiz4_5gnk.db4g"><intent_id>801207</intent_id><project_id>741463</project_id><text_data>To supply and install fiber connections which can be used for telephone (voice over distance) and data (bits &amp; bytes connections within the telecommunications system. This work will be performed indoors.</text_data><comment_date>2016-11-11T00:00:00</comment_date></row><row _id="row-ssna~zphk-fs4z" _uuid="00000000-0000-0000-5766-FC047B4F6867" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ssna~zphk-fs4z"><intent_id>1001151</intent_id><project_id>877565</project_id><text_data>HIRED BY LA NACIONAL CONSTRUCTION</text_data><comment_date>2019-08-20T00:00:00</comment_date></row><row _id="row-s6ct.7shp_7bpw" _uuid="00000000-0000-0000-2B8A-7DCC40125BD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s6ct.7shp_7bpw"><intent_id>796106</intent_id><project_id>804995</project_id><text_data>The project is an aquatic herbicide application in an effort to control nuisance and invasive aquatic plants. It will occur on Clover Island Marina on the Columbia River. The general laborer is responsible to apply the herbicides.</text_data><comment_date>2016-10-20T00:00:00</comment_date></row><row _id="row-8gbf.g3z3_zxgi" _uuid="00000000-0000-0000-A3F5-71E563C04B50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8gbf.g3z3_zxgi"><intent_id>1247994</intent_id><project_id>1009361</project_id><text_data>owner/operator wage is 130.00 hour</text_data><comment_date>2022-07-28T00:00:00</comment_date></row><row _id="row-iz2x_xrm7-9nny" _uuid="00000000-0000-0000-582F-92D7C16DB0E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iz2x_xrm7-9nny"><intent_id>889718</intent_id><project_id>844381</project_id><text_data>Cleanup after sewage backup in stairwell.</text_data><comment_date>2018-02-22T00:00:00</comment_date></row><row _id="row-c42m~5w5k_48vu" _uuid="00000000-0000-0000-AD6F-9AC96348A319" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c42m~5w5k_48vu"><intent_id>529752</intent_id><project_id>691372</project_id><text_data>Our prime contractor (premier Excavation) told me to file through L&amp;I even though it's a federal wage job. Note that the orig. wage for federal is in the wage spot then i put in the fringe of $10.00 plus $2.00 travel zone to the fringe making a total of $12.00. so the wage plus the fringe is the actual total we will be paying our guys. there was no other spot to show the total. CT= $35.41 &amp; CFT= $35.68 which is higher than L&amp;I wage so thats what I was told to pay. Hope this is okay for filing purposes?</text_data><comment_date>2012-08-21T00:00:00</comment_date></row><row _id="row-m2e3_5wni~e49v" _uuid="00000000-0000-0000-432E-6A22BE1D8BA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2e3_5wni~e49v"><intent_id>722053</intent_id><project_id>772940</project_id><text_data>A hydronic loop supply line broke in the ceiling of the music room. We are drying out walls, floor and ceiling. Employees setting up fans and dehumidifiers.</text_data><comment_date>2015-09-29T00:00:00</comment_date></row><row _id="row-gy6b_mg9j~iz77" _uuid="00000000-0000-0000-B290-A2FBE45F0CA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gy6b_mg9j~iz77"><intent_id>727888</intent_id><project_id>775235</project_id><text_data>The technician will be driving a standard pick-up and delivering the equipment to the job site.</text_data><comment_date>2015-10-22T00:00:00</comment_date></row><row _id="row-g77t-g87k~5abt" _uuid="00000000-0000-0000-B7FF-6A6F52DC3042" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g77t-g87k~5abt"><intent_id>1167083</intent_id><project_id>974088</project_id><text_data>1. Install single head ductless. 2. Mobile home. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2021-08-06T00:00:00</comment_date></row><row _id="row-cex9_jnxy_xddi" _uuid="00000000-0000-0000-6392-42910B711254" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cex9_jnxy_xddi"><intent_id>532922</intent_id><project_id>694419</project_id><text_data>WSDOT NUMBER IS INCORRECT, SHOULD BE #8335</text_data><comment_date>2012-09-06T00:00:00</comment_date></row><row _id="row-xnnz.3nga~ips7" _uuid="00000000-0000-0000-B91D-B515D48294FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xnnz.3nga~ips7"><intent_id>612539</intent_id><project_id>684220</project_id><text_data>THIS INTENT IS BEING FILED TO REPLACE INTENT DI#600388 WHICH WAS FILED W/INCORRECT HIRING CONTRACTOR INFORMATION.  ONCE THIS NEW INTENT IS APPROVED PLEASE DELETE INTENT ID #600388.</text_data><comment_date>2014-01-16T00:00:00</comment_date></row><row _id="row-rg2r~z5fn_67k8" _uuid="00000000-0000-0000-2C50-2A021FE4134E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rg2r~z5fn_67k8"><intent_id>672279</intent_id><project_id>751926</project_id><text_data>INSTALL INSULATIONSINGLE FAMILYSINGLE STORYNONOYESNONONONONONONONOYESYESNONO</text_data><comment_date>2015-01-06T00:00:00</comment_date></row><row _id="row-tnc4.js5b_4aam" _uuid="00000000-0000-0000-D6CB-5CE7AC6DB876" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tnc4.js5b_4aam"><intent_id>736300</intent_id><project_id>780141</project_id><text_data>Job # 8008224</text_data><comment_date>2015-12-07T00:00:00</comment_date></row><row _id="row-rxar.aff7-umqs" _uuid="00000000-0000-0000-0CBD-6EEDFD580FD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rxar.aff7-umqs"><intent_id>1388446</intent_id><project_id>1090832</project_id><text_data>HDF Fusion team will be performing fusion work on this.</text_data><comment_date>2023-12-15T00:00:00</comment_date></row><row _id="row-qtxw~4y3q.x63d" _uuid="00000000-0000-0000-E54F-187D2FC944FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qtxw~4y3q.x63d"><intent_id>1154545</intent_id><project_id>967672</project_id><text_data>Other Truck =  lowbed, mobilization of equipment (Teamster's Union)</text_data><comment_date>2021-07-07T00:00:00</comment_date></row><row _id="row-iqve~4vsg.5zmc" _uuid="00000000-0000-0000-8B1F-DA096446C55F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iqve~4vsg.5zmc"><intent_id>1254480</intent_id><project_id>1024732</project_id><text_data>Install dishwasher General Installation tools used by our technicians: cordless drill, multi screwdriver, ball pin hammer, small floor jack, silicone gun, floor dollies, channel locks, Sawzall, pry bar, All technicians use company supplied vehicles to arrive at job site</text_data><comment_date>2022-08-02T00:00:00</comment_date></row><row _id="row-hnw4-7tus_r9u6" _uuid="00000000-0000-0000-0154-4767BE1E5D80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hnw4-7tus_r9u6"><intent_id>1058348</intent_id><project_id>914570</project_id><text_data>204641-001</text_data><comment_date>2020-05-15T00:00:00</comment_date></row><row _id="row-qnn9.5yer.m3qs" _uuid="00000000-0000-0000-149C-4D0481B8B210" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qnn9.5yer.m3qs"><intent_id>680048</intent_id><project_id>756060</project_id><text_data>THIS IS THE FOURTH (OF FOUR POSSIBLE) YEAR&amp;#39;S CONTRACT EXTENSION OF CONTRACT ORIGINAL BID DATE 5/5/2011, AWARD DATE 5/9/2011. INTENT IS FOR YEAR 2015, WITH APPLICABLE WAGE RATES.</text_data><comment_date>2015-02-19T00:00:00</comment_date></row><row _id="row-cqmn.3bbr.8pbm" _uuid="00000000-0000-0000-142C-D025255DBB45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqmn.3bbr.8pbm"><intent_id>812063</intent_id><project_id>721306</project_id><text_data>Job 21324</text_data><comment_date>2017-01-20T00:00:00</comment_date></row><row _id="row-9raa_4eby-pkdf" _uuid="00000000-0000-0000-6E32-D91F3C67F43C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9raa_4eby-pkdf"><intent_id>487120</intent_id><project_id>669027</project_id><text_data>Jefferson Playfield / MidMountain</text_data><comment_date>2011-11-02T00:00:00</comment_date></row><row _id="row-7ff5~58ay_zkac" _uuid="00000000-0000-0000-BAF3-C30CF299DAFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ff5~58ay_zkac"><intent_id>1144413</intent_id><project_id>940195</project_id><text_data>Please note that we are a Manufacturing Company located in the State of Ohio and we will not have any workers in the State of Washington.  Note as well that we are covered under the Ohio Bureau of Workers Compensation.</text_data><comment_date>2021-05-25T00:00:00</comment_date></row><row _id="row-idqf-jcnx.e2ic" _uuid="00000000-0000-0000-20F2-76F8F0D6FA23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-idqf-jcnx.e2ic"><intent_id>501408</intent_id><project_id>675428</project_id><text_data>Fringe: Medical Ins - $12.32/HR; Holiday - $0.73/HR; Personal time - $0.41/HR; Vacation  $0.81/HR = $14.27</text_data><comment_date>2012-03-04T00:00:00</comment_date></row><row _id="row-brm5~s8tz~rmc3" _uuid="00000000-0000-0000-6FD1-4F240D56485B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brm5~s8tz~rmc3"><intent_id>1284944</intent_id><project_id>1041708</project_id><text_data>The Intent was initially submitted with the PO number as the contract number - and we subsequently noted that we had in prior years always successfully used the SWR contract number, so we have now updated our Intent's contract number to the 2022 SWR contract number in the re-submitted Intent for 2022.</text_data><comment_date>2022-11-22T00:00:00</comment_date></row><row _id="row-vmxf~vrya_9nku" _uuid="00000000-0000-0000-83AC-F913EF2F3FB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vmxf~vrya_9nku"><intent_id>1139554</intent_id><project_id>959646</project_id><text_data>� #1: 1409 5th St, Wenatchee WA 98801� #2: Apartment� #3: 3 Floors� #4: Multi-Family Housing� A: No� B: No� C: No� D: No� E: No� F: No� G: No� I: Yes� #5. Yes� #6: Yes� #7: No� #8: No</text_data><comment_date>2021-04-26T00:00:00</comment_date></row><row _id="row-ctdq~mdbx~wudv" _uuid="00000000-0000-0000-F7BF-014B2EAC6168" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ctdq~mdbx~wudv"><intent_id>799598</intent_id><project_id>804940</project_id><text_data>Total scope of work: construct new storm water run off improvements to include curb, gutter and roadside improvementsOur scope of work: mechanically remove noxious weeds that are on site in area to be planted, Planting up to 800 1 gallon and smaller plants as per landscape plans. Hand digging planting holes in existing bioswale soil to maximum depth of 18 inches, broadcast wildflower seed as per specs over entire planting area, maintain planted material until final inspection has been passed.Tools to be used: Rakes, shovels, wheelbarrows, hand weeding implements</text_data><comment_date>2016-11-03T00:00:00</comment_date></row><row _id="row-wdd2_9jux~kstt" _uuid="00000000-0000-0000-A35A-F34CBC663724" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wdd2_9jux~kstt"><intent_id>571805</intent_id><project_id>707576</project_id><text_data>This intent was originally filed in error under my inactive Sole Prop account under UBI 602-840-613.</text_data><comment_date>2013-05-28T00:00:00</comment_date></row><row _id="row-w2ab.jvxi-9ay6" _uuid="00000000-0000-0000-1916-7C39242E0712" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w2ab.jvxi-9ay6"><intent_id>525032</intent_id><project_id>692574</project_id><text_data>Job # 172058</text_data><comment_date>2012-07-27T00:00:00</comment_date></row><row _id="row-rgeb.zwrk-kuyd" _uuid="00000000-0000-0000-AD77-59A1B9A81887" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rgeb.zwrk-kuyd"><intent_id>1057704</intent_id><project_id>882989</project_id><comment_date>2020-05-13T00:00:00</comment_date></row><row _id="row-5vk8~7n9e~a8pw" _uuid="00000000-0000-0000-1FAE-2C4A257E81DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vk8~7n9e~a8pw"><intent_id>1158919</intent_id><project_id>969951</project_id><text_data>I finished training for Prevailing Wages</text_data><comment_date>2021-07-23T00:00:00</comment_date></row><row _id="row-vx36_4qeb_nfrb" _uuid="00000000-0000-0000-CF5B-5A0FB9856D2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vx36_4qeb_nfrb"><intent_id>555937</intent_id><project_id>704791</project_id><text_data>Form filed by: Michael HummelState of WA - Dept. of L&amp;I - Prevailing Wage DivisionExemption Intent Questionnaire form - UW Data Center Westing Bldg PointPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:****** 1.  What was the purpose of the project?    The purpose of this project is to provide software programming for the new computer room AC units.****** 2.  Does this project entail the remodeling or new construction of a facility?    Yes, but not performed by Siemens Employees.****** 3.  What specific tasks did your employees perform?    Siemens' BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.****** 4.  What if any tools did your employees use in the performance of those tasks?   Laptop computer****** 5.  If your employee used no tools, did they engage in any other type of manual, hands on efforts in completing their tasks?    No - none.To expedite our determination, please be as detailed as possible in responding to these questions.  For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form. To expedite our determination, please be as detailed as possible in responding to these questions.  For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2013-02-13T00:00:00</comment_date></row><row _id="row-brqy~9pyd~ufve" _uuid="00000000-0000-0000-675D-AFD73327FDFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brqy~9pyd~ufve"><intent_id>604125</intent_id><project_id>723765</project_id><text_data>4830 E Commerce	Spokane	99212708 E Longfellow Spokane 992075904 N Canal Newman Lk 990254223 E 2nd Spokane 9920213520 E Rich #9	Spokane Valley	992163904 E 12th Spokane 99202603 E Rosewood #2 Spokane 992088900 S Mullen Hill #107	Spokane	99224417 E Longfellow Spokane 992072205 E 48th Spokane 99223708 E Lacrosse	Spokane	992072108 E. Columbia Spokane 992084821 N Calvin Rd. Spokane Valley 992167408 E 4th Spokane Valley 992123517 E Oregon Rd Elk 990091008 E Queen Spokane 99207917 E Glass Spokane 992072122 E Decatur	Spokane	992084218 N Evergreen Spokane Valley	992161805 W 18th Spokane 99204</text_data><comment_date>2013-11-12T00:00:00</comment_date></row><row _id="row-edue-uv7p.uttu" _uuid="00000000-0000-0000-AB27-D62BD621A44B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-edue-uv7p.uttu"><intent_id>782675</intent_id><project_id>799879</project_id><text_data>Inv 56155</text_data><comment_date>2016-08-16T00:00:00</comment_date></row><row _id="row-zuek~fy47~g3a7" _uuid="00000000-0000-0000-D156-0548B47F2A4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zuek~fy47~g3a7"><intent_id>1265063</intent_id><project_id>1029967</project_id><text_data>VE 21661</text_data><comment_date>2022-09-08T00:00:00</comment_date></row><row _id="row-mt9e~aseu.aay3" _uuid="00000000-0000-0000-39AA-85EC85A5DAC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mt9e~aseu.aay3"><intent_id>701018</intent_id><project_id>764999</project_id><text_data>paging speakers</text_data><comment_date>2015-06-16T00:00:00</comment_date></row><row _id="row-4w7n_j6f2-wnxd" _uuid="00000000-0000-0000-ACC1-2649990029B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4w7n_j6f2-wnxd"><intent_id>1221880</intent_id><project_id>998266</project_id><text_data>Broom/Vacuum Sweeper Truck</text_data><comment_date>2022-03-30T00:00:00</comment_date></row><row _id="row-py6y_iti8.kyq9" _uuid="00000000-0000-0000-FAEC-101AC1AB28D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-py6y_iti8.kyq9"><intent_id>1142355</intent_id><project_id>961107</project_id><comment_date>2021-05-06T00:00:00</comment_date></row><row _id="row-cs5q~bc2t-p9ts" _uuid="00000000-0000-0000-7586-6D5A00B8FB8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cs5q~bc2t-p9ts"><intent_id>1247433</intent_id><project_id>1021076</project_id><text_data>SRO 1917255 1917256</text_data><comment_date>2022-07-08T00:00:00</comment_date></row><row _id="row-vk74-2bvz-meyg" _uuid="00000000-0000-0000-4974-69FA26C4B51F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vk74-2bvz-meyg"><intent_id>615014</intent_id><project_id>728341</project_id><text_data>Owner, Brad Lang</text_data><comment_date>2014-02-04T00:00:00</comment_date></row><row _id="row-2wxi_y3ep.9732" _uuid="00000000-0000-0000-DF88-B4EF07ACE6E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2wxi_y3ep.9732"><intent_id>1273814</intent_id><project_id>1026753</project_id><text_data>Project consists of a Non-motorized Shared Path. Our scope of work is a process called 'StreetPrint'. Edge Concrete uses a hand directed heating unit to warm specific sections of asphalt and then a second worker follows behind and uses a compactor to imprint the asphalt with a pattern or color. Both the compactor and the heating unit are manually moved by general laborers. Please advise if any other classification more closely aligns with the work.</text_data><comment_date>2022-11-08T00:00:00</comment_date></row><row _id="row-h52g_acfy.xgjx" _uuid="00000000-0000-0000-2E06-75DA4CCA91ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h52g_acfy.xgjx"><intent_id>951834</intent_id><project_id>868704</project_id><text_data>This will be for 464481-0000/474116-00 Per Carla Nichols</text_data><comment_date>2018-12-20T00:00:00</comment_date></row><row _id="row-vnz6.2fh7.9m7e" _uuid="00000000-0000-0000-0197-9F4A02CF8020" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vnz6.2fh7.9m7e"><intent_id>1243484</intent_id><project_id>987880</project_id><text_data>The truck being used is a Kenworth T370. He may deliver or pick up materials as needed. But at this moment it doesn't seem like he will be delivering to this job. The truck driver is added in the event materials are needed to be delivered by us.</text_data><comment_date>2022-08-11T00:00:00</comment_date></row><row _id="row-fp9s~2nws~ybsw" _uuid="00000000-0000-0000-579B-EA1BE783BAD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fp9s~2nws~ybsw"><intent_id>1232023</intent_id><project_id>1012265</project_id><text_data>WO#27895 Job#2751</text_data><comment_date>2022-05-09T00:00:00</comment_date></row><row _id="row-exyp.bthg~vdvg" _uuid="00000000-0000-0000-6213-2EBCBDC7CA42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-exyp.bthg~vdvg"><intent_id>844140</intent_id><project_id>825795</project_id><text_data>A. Install 10 zone automatic sprinklers system. Trenching with trencher,trenching shovels, hard rakes, pvc pipe cutters.</text_data><comment_date>2017-06-29T00:00:00</comment_date></row><row _id="row-zfw9_f2qt.r8xi" _uuid="00000000-0000-0000-A905-01B0800F3C89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zfw9_f2qt.r8xi"><intent_id>488271</intent_id><project_id>674199</project_id><text_data>Grays harbor county</text_data><comment_date>2011-11-08T00:00:00</comment_date></row><row _id="row-bbvw~4bfn.6da8" _uuid="00000000-0000-0000-199B-65754F44EA00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bbvw~4bfn.6da8"><intent_id>1190718</intent_id><project_id>972846</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications Category 6A and fiber optic cabling for voice (telephone) and data (computer networking) indoors and outdoors. POWERCOM JOB# 421115</text_data><comment_date>2021-11-03T00:00:00</comment_date></row><row _id="row-bws2_fiww_xjgm" _uuid="00000000-0000-0000-7460-02EE42597070" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bws2_fiww_xjgm"><intent_id>941541</intent_id><project_id>839971</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2018-11-01T00:00:00</comment_date></row><row _id="row-c3u8-c24w~74zz" _uuid="00000000-0000-0000-1657-9FECF85232D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c3u8-c24w~74zz"><intent_id>598193</intent_id><project_id>718110</project_id><text_data>Health &amp; Welfare - $7.23, Pension Fund - $9.48, Retirement - $3.41, NEBF/Union - $2.10</text_data><comment_date>2013-10-08T00:00:00</comment_date></row><row _id="row-xjeb~4pqi-86yb" _uuid="00000000-0000-0000-7657-A34BA7FBE80D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xjeb~4pqi-86yb"><intent_id>944536</intent_id><project_id>865953</project_id><text_data>Employees drive either a 2500 or a 3500 Chevy Silverado to and from the job site. This work was annual preventative maintenance, change oil, oil filter, fuel filter, preform battery test, 27 point inspection and transfer test. Performed load bank, a resistive test for 2 hours progressing to 80% of generator capacity.</text_data><comment_date>2018-11-07T00:00:00</comment_date></row><row _id="row-busc.vqr3-q5zx" _uuid="00000000-0000-0000-B701-8BDC74EF5A33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-busc.vqr3-q5zx"><intent_id>1173669</intent_id><project_id>977375</project_id><text_data>Cut down 4 Lombardy Poplar trees. Chip limbs and leave the chips on site. Haul trunk wood away. Owner of company drove truck that hauled the trunk wood away.</text_data><comment_date>2021-08-30T00:00:00</comment_date></row><row _id="row-qq4p.nrkp_kxp8" _uuid="00000000-0000-0000-E4B9-57C5DF9AE4CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qq4p.nrkp_kxp8"><intent_id>1030641</intent_id><project_id>904003</project_id><text_data>On 1/14/2020 by dycc235:--From: Janet Ellis &amp;lt;janet@prograss.com&amp;gt; Sent: Thursday, January 9, 2020 9:59 AMTo: Dyce, Craig (LNI) &amp;lt;dycc235@LNI.WA.GOV&amp;gt;Subject: Re: Correction NoticeHi Craig,Here is the additional information that has been requested on our Statement of Intent. Please let me know if you need further information.Description of the Whole Project: Irrigation system repair: Dig up and expose faulty portion of irrigation system, replace faulty parts and test for leaks. Bury repaired section and smooth surface to match existing grade.Description of our part of the project, including tasks performed, equipment &amp; tools used, and relevant depths: Irrigation system repair: Dig up and expose faulty portion of irrigation system, replace faulty parts and test for leaks. Bury repaired section and smooth surface to match existing grade. Equipment: shovel, saw, PVC glue and PVC parts. Irrigation system located a a depth of 24&amp;quot;-30&amp;quot;.Thank you for your help,Janet EllisPayroll &amp; Benefits Manager</text_data><comment_date>2020-01-15T00:00:00</comment_date></row><row _id="row-ydn8-pcr8-67mp" _uuid="00000000-0000-0000-1F5C-AF1979A10F17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ydn8-pcr8-67mp"><intent_id>475060</intent_id><project_id>673304</project_id><text_data>1.) 0-8,000 Gallon Water Truck - Dust Control only if needed2.)</text_data><comment_date>2011-09-19T00:00:00</comment_date></row><row _id="row-vhh4~erfy-kfiq" _uuid="00000000-0000-0000-D72D-A8CE20B701F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vhh4~erfy-kfiq"><intent_id>829585</intent_id><project_id>816267</project_id><text_data>PN # 39555 SEA</text_data><comment_date>2017-04-28T00:00:00</comment_date></row><row _id="row-5b25~tm4g-ke54" _uuid="00000000-0000-0000-3E62-39F22C61115F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5b25~tm4g-ke54"><intent_id>745331</intent_id><project_id>775837</project_id><text_data>We also had a helicopter pilot which is not listed in your occupation list.  He is the owner/operator and wages are $5000.00 per month</text_data><comment_date>2016-02-05T00:00:00</comment_date></row><row _id="row-cdw9_qxqh_8mzw" _uuid="00000000-0000-0000-135D-721338505680" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cdw9_qxqh_8mzw"><intent_id>995210</intent_id><project_id>888168</project_id><text_data>Project is sediment removal in creeks.  Our work will be hydroseeding of grasses with a 75hp Bowie Hydroseeder.</text_data><comment_date>2019-07-29T00:00:00</comment_date></row><row _id="row-wsjt~gqcr.3sgd" _uuid="00000000-0000-0000-9732-1A531864DE9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wsjt~gqcr.3sgd"><intent_id>617847</intent_id><project_id>729839</project_id><text_data>1. Weatherize Home2. Single Family Dwelling3. One Level4. a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no5.yes6.yes7.no8.no</text_data><comment_date>2014-02-26T00:00:00</comment_date></row><row _id="row-suv4~q6dq-enbh" _uuid="00000000-0000-0000-8B23-5AAA0AAF0298" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-suv4~q6dq-enbh"><intent_id>615869</intent_id><project_id>727902</project_id><text_data>Filed By: Alexander Slobodchikov</text_data><comment_date>2014-02-11T00:00:00</comment_date></row><row _id="row-wh5k-caej~9wpt" _uuid="00000000-0000-0000-9F2E-FC8E23826980" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wh5k-caej~9wpt"><intent_id>1286607</intent_id><project_id>1042728</project_id><text_data>This project is primarily aerial work - running fiberoptic cable from PSE pole down to customer provided conduit.  Is provided for future phone and internet service.</text_data><comment_date>2022-11-30T00:00:00</comment_date></row><row _id="row-8btn.v76r.eu8w" _uuid="00000000-0000-0000-CC86-8EDEA65ADF09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8btn.v76r.eu8w"><intent_id>1038663</intent_id><project_id>891423</project_id><text_data>REPLACES INTENT 1007895 PER EMAIL FROM AWARDING AGENCY &amp; PRIME</text_data><comment_date>2020-02-14T00:00:00</comment_date></row><row _id="row-5ve5.qhtu.uynz" _uuid="00000000-0000-0000-C739-B94FDA8BDDF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ve5.qhtu.uynz"><intent_id>771370</intent_id><project_id>795653</project_id><text_data>Applied Liquid weed control and cranefly control for lawn areas at multiple city parks.</text_data><comment_date>2016-06-28T00:00:00</comment_date></row><row _id="row-4z74-gv3s~vjrh" _uuid="00000000-0000-0000-3723-AEBFC24D8E33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4z74-gv3s~vjrh"><intent_id>832939</intent_id><project_id>804784</project_id><text_data>General Labor - Pouring Concrete Curbing - No Finish Work, No Cement Masonry</text_data><comment_date>2017-05-25T00:00:00</comment_date></row><row _id="row-c9pf~xdr8~fbvv" _uuid="00000000-0000-0000-CE9E-D92C7F77831F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9pf~xdr8~fbvv"><intent_id>933338</intent_id><project_id>861621</project_id><text_data>We hand scrub the hoods with s.o.s. pads, degreaser, steel wool, mop handles, and rags. We then polish the hoods with wd-40 to make them look shinny. We use putty knifes, chisels, and scrapers to scrape some of the grease off.</text_data><comment_date>2018-09-17T00:00:00</comment_date></row><row _id="row-yhd7.pbrr_eemi" _uuid="00000000-0000-0000-2474-A7F6D4A0B1F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yhd7.pbrr_eemi"><intent_id>678854</intent_id><project_id>755534</project_id><text_data>Fringe BreakdownLABORERS:  $11.06H &amp; W   = $6.00Pension = $4.50Training= $0.50Trust     = $0.06OPERATORS:  $13.15H &amp; W   = $5.80Pension = $6.75Training= $0.60TEAMSTERS:  $15.19H &amp; W   = $9.14Pension = $5.80Training= $0.25</text_data><comment_date>2015-02-11T00:00:00</comment_date></row><row _id="row-8yf9.uw2z_d8pr" _uuid="00000000-0000-0000-12AB-5A072637CA3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yf9.uw2z_d8pr"><intent_id>662437</intent_id><project_id>744965</project_id><text_data>C Bordelon1718 S College St., Seattle, WA  981441. Electrical remodel   2. Yes    3. 1 or 2    4. SFR   A. no  B. no   C. yes   D-F. no   5. yes   6. yes   7. no   8. no</text_data><comment_date>2014-10-27T00:00:00</comment_date></row><row _id="row-mpvd.ebk5_7nap" _uuid="00000000-0000-0000-C5FF-E2729E57B6B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpvd.ebk5_7nap"><intent_id>590222</intent_id><project_id>712552</project_id><text_data>INSTALLATION OF NATIVE PLANT MATERIAL, PLACE 3&amp;quot; BARK FOR BEAUTIFICATION OF PROJECT.</text_data><comment_date>2013-08-27T00:00:00</comment_date></row><row _id="row-rg26_5ccx.wer7" _uuid="00000000-0000-0000-95DE-9197D84F917A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rg26_5ccx.wer7"><intent_id>534515</intent_id><project_id>689756</project_id><text_data>122031</text_data><comment_date>2012-09-14T00:00:00</comment_date></row><row _id="row-ygkz.8ghh~dehp" _uuid="00000000-0000-0000-0188-E2C94B2439E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ygkz.8ghh~dehp"><intent_id>511489</intent_id><project_id>687508</project_id><text_data>Filed by: Charlie McClaskey</text_data><comment_date>2012-05-11T00:00:00</comment_date></row><row _id="row-u64j.f656-qigg" _uuid="00000000-0000-0000-E92E-C81DFD764FA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u64j.f656-qigg"><intent_id>476002</intent_id><project_id>673687</project_id><text_data>The scope of work for this project is to install a wireless access points for voice and data infrastructure.</text_data><comment_date>2011-09-01T00:00:00</comment_date></row><row _id="row-wcpq_tpwx.dyyu" _uuid="00000000-0000-0000-89FF-0942214B1527" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wcpq_tpwx.dyyu"><intent_id>678114</intent_id><project_id>755217</project_id><text_data>Steven Keith 1924 E. Section, Mt Vernon, WA 98274Sharon Chacksfield 2725 E. Fir St #25, Mt Vernon WA 98273Diane Kelly 700 N Reed St #91, Sedro Wooley WA 98284Kelvin Cobain 1102 S. 21st St, Mt Vernon WA 98274 Paul Kennedy 920 Maple Lane, Sedro Woolley WA 98284All single family homes.Arthur Gordon 1820 Cascade Vista, Burlington WA 98233</text_data><comment_date>2015-02-06T00:00:00</comment_date></row><row _id="row-qtje~6ugf.iz3f" _uuid="00000000-0000-0000-CE1E-9B9CA4C31B80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qtje~6ugf.iz3f"><intent_id>829703</intent_id><project_id>802311</project_id><text_data>Union Contributions: WCISAP Drug Testing .06, Pension 9.51, Health/Wellness 6.40, App 1.00, LMCI .10 Total: $17.07</text_data><comment_date>2017-04-28T00:00:00</comment_date></row><row _id="row-pvfk_vpuj~xe3m" _uuid="00000000-0000-0000-C2D5-2DCD0DC16382" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pvfk_vpuj~xe3m"><intent_id>885620</intent_id><project_id>842472</project_id><text_data>Replace 2 gas furnaces at Laurel Village using common hand tools.</text_data><comment_date>2018-02-12T00:00:00</comment_date></row><row _id="row-gnzu-j2c5~waay" _uuid="00000000-0000-0000-93C2-E70D30DF4026" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gnzu-j2c5~waay"><intent_id>546734</intent_id><project_id>700666</project_id><text_data>Form filed by: Mark Triebenbach</text_data><comment_date>2012-12-04T00:00:00</comment_date></row><row _id="row-sc9b~gtis-6r6z" _uuid="00000000-0000-0000-2BC1-AF6E52EC516E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sc9b~gtis-6r6z"><intent_id>887045</intent_id><project_id>843119</project_id><text_data>check and service oil furnace.</text_data><comment_date>2018-02-07T00:00:00</comment_date></row><row _id="row-r5ft~wfx7_t365" _uuid="00000000-0000-0000-7554-5845BE23EBCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5ft~wfx7_t365"><intent_id>743074</intent_id><project_id>783368</project_id><text_data>As per conversation with L&amp;I this morning they stated I need to put in &amp;quot;prevailing wage rates.&amp;quot; This is what I have done. I will amend this Intent to show 2016 Union rates when I receive the paperwork. Union Rates are always higher the L&amp;I rates so it will increase from what is shown.</text_data><comment_date>2016-01-25T00:00:00</comment_date></row><row _id="row-qaji-85xz.xcb8" _uuid="00000000-0000-0000-417B-0626F5713A95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qaji-85xz.xcb8"><intent_id>534364</intent_id><project_id>695892</project_id><text_data>Tree work at Kasch Park and the Preserve</text_data><comment_date>2012-09-13T00:00:00</comment_date></row><row _id="row-xsdk~erx6-y6uy" _uuid="00000000-0000-0000-8A9D-4FC27EA44142" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xsdk~erx6-y6uy"><intent_id>563835</intent_id><project_id>708479</project_id><text_data>Form filed by: Carol McArdle</text_data><comment_date>2013-04-09T00:00:00</comment_date></row><row _id="row-4n3y.wrxc.6put" _uuid="00000000-0000-0000-7BC5-17C7278E30BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4n3y.wrxc.6put"><intent_id>1005385</intent_id><project_id>890109</project_id><text_data>Other truck = LTA 9000 Chevy Water Truck</text_data><comment_date>2019-09-06T00:00:00</comment_date></row><row _id="row-sbgx~h7i6~6xzs" _uuid="00000000-0000-0000-935E-45330405F2F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sbgx~h7i6~6xzs"><intent_id>757039</intent_id><project_id>789745</project_id><text_data>pump and clean chemical tanksHaz Waste worker to clean tanks using rags, spongesMotorPatrol Grader to vacuum tank</text_data><comment_date>2016-04-18T00:00:00</comment_date></row><row _id="row-uevm-mgzc-k9ct" _uuid="00000000-0000-0000-6791-138C4016572A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uevm-mgzc-k9ct"><intent_id>613964</intent_id><project_id>724025</project_id><text_data>915 n. 15th ave #41 Yakima,wa 98902 1. install bath fan 2. single family 3. 1 story mobile 4. a no b. no c. yes d. no e. nof.no g. no h. no I. no.jo. no k. no5. yes. 6. yes 7. o 8. no</text_data><comment_date>2014-01-28T00:00:00</comment_date></row><row _id="row-mkrm.yw9s_wp5f" _uuid="00000000-0000-0000-3E37-133B75D25458" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mkrm.yw9s_wp5f"><intent_id>581739</intent_id><project_id>715000</project_id><text_data>We will be installing topsoil and trees.</text_data><comment_date>2013-07-17T00:00:00</comment_date></row><row _id="row-uneh_2hps-tysd" _uuid="00000000-0000-0000-4357-5DD9D027369A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uneh_2hps-tysd"><intent_id>889812</intent_id><project_id>844446</project_id><text_data>Filed by Jaime PettiboneProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trade occupations.</text_data><comment_date>2018-02-23T00:00:00</comment_date></row><row _id="row-wehe-sbx4_sdx7" _uuid="00000000-0000-0000-E301-1C43D9B873FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wehe-sbx4_sdx7"><intent_id>726605</intent_id><project_id>767672</project_id><text_data>Taylor Transport Inc. 401K Pension plan is 100% immediately vested and paid weekly</text_data><comment_date>2015-10-15T00:00:00</comment_date></row><row _id="row-fm2w_iah4-wy99" _uuid="00000000-0000-0000-F8F0-46DEA846E069" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fm2w_iah4-wy99"><intent_id>483934</intent_id><project_id>667794</project_id><text_data>451 pence rd #13yakima,wa 98908</text_data><comment_date>2011-10-15T00:00:00</comment_date></row><row _id="row-267u~pif3~psvv" _uuid="00000000-0000-0000-B252-BD65944E74A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-267u~pif3~psvv"><intent_id>607229</intent_id><project_id>725053</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. - INSULATION IN RESIDENTIAL HOME#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? SINGLE FAMILY HOME#3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO (e) Transitional housing?NO (f) Communal dining facility?NO (g) Treatment services? (h) Dormitories? NO(i) Counseling?NO (j) Is each room and/or bed in the structure rented separately?NO (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? yes#6 - Does each dwelling unit have its own bathroom? yes#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public?NO</text_data><comment_date>2013-12-05T00:00:00</comment_date></row><row _id="row-3hmg~eyzp.yqyj" _uuid="00000000-0000-0000-D09A-3BD01F1758B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3hmg~eyzp.yqyj"><intent_id>502563</intent_id><project_id>683635</project_id><text_data>trucking dirt an rock in and out of job site</text_data><comment_date>2012-03-02T00:00:00</comment_date></row><row _id="row-w76a-xde8.dne6" _uuid="00000000-0000-0000-4318-BAA42DDEF774" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w76a-xde8.dne6"><intent_id>1034426</intent_id><project_id>906127</project_id><text_data>Troubleshoot dryer outletsingle family 2livingnonoyesnononononononononononono</text_data><comment_date>2020-01-28T00:00:00</comment_date></row><row _id="row-ayc9.qxxu.2p8n" _uuid="00000000-0000-0000-45D5-88014D48314C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ayc9.qxxu.2p8n"><intent_id>898514</intent_id><project_id>848287</project_id><text_data>Filed by Dennis Ryan</text_data><comment_date>2018-04-13T00:00:00</comment_date></row><row _id="row-y8q2-3ti3.hyrm" _uuid="00000000-0000-0000-BD26-F6C7613E4301" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8q2-3ti3.hyrm"><intent_id>562022</intent_id><project_id>707675</project_id><text_data>Telecommunication cabling systems. Inside workInstall new fiber and copper backbones between MDF and IDF-P12 existing cabinet in froom P12</text_data><comment_date>2013-04-22T00:00:00</comment_date></row><row _id="row-dw97.8gdi~kezf" _uuid="00000000-0000-0000-5BF6-3AD22E4E13C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dw97.8gdi~kezf"><intent_id>967163</intent_id><project_id>873166</project_id><text_data>PTI SO 144854</text_data><comment_date>2019-03-24T00:00:00</comment_date></row><row _id="row-skhi_eha7-bt65" _uuid="00000000-0000-0000-2341-8229123EC002" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-skhi_eha7-bt65"><intent_id>865558</intent_id><project_id>822282</project_id><text_data>WE ARE PROVIDING HYDROSEEDING ONLY</text_data><comment_date>2017-09-27T00:00:00</comment_date></row><row _id="row-xg34-vq4c_4xpd" _uuid="00000000-0000-0000-D8C6-47C4722E22FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xg34-vq4c_4xpd"><intent_id>864566</intent_id><project_id>829316</project_id><text_data>Filed by Jesse D. Zellmann</text_data><comment_date>2017-09-22T00:00:00</comment_date></row><row _id="row-5r7d_h3yu_68kq" _uuid="00000000-0000-0000-910F-34ED87D5D62B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5r7d_h3yu_68kq"><intent_id>813289</intent_id><project_id>812225</project_id><text_data>Inv #18051 - POE Bldg. 120 - Trane Unit (Serving Area behind Jan Connor Office)- Replace Motor, Capacitor &amp; Relay.</text_data><comment_date>2017-01-29T00:00:00</comment_date></row><row _id="row-h67k.smw3.8c3f" _uuid="00000000-0000-0000-9291-C515CA5A021B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h67k.smw3.8c3f"><intent_id>789981</intent_id><project_id>802711</project_id><text_data>It is all inside work. Technician will be terminating to a patch panel for phone lines in the phone/data closet and running Cat6 cable to the office terminate onto a Cat 6 jack and put into a wall plate. Then a patch cord will be run from wall plate to phone.</text_data><comment_date>2016-09-23T00:00:00</comment_date></row><row _id="row-askw~vzky.d7pn" _uuid="00000000-0000-0000-9B1E-3D923C3E1119" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-askw~vzky.d7pn"><intent_id>787972</intent_id><project_id>801971</project_id><text_data>No work was performed on site by the Telecommunication Technician.  Tech had one hour of drive time delivering material.</text_data><comment_date>2016-09-15T00:00:00</comment_date></row><row _id="row-2ei9_nsme_vbmb" _uuid="00000000-0000-0000-3302-3DF017006D42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ei9_nsme_vbmb"><intent_id>476382</intent_id><project_id>505880</project_id><text_data>This stinks - a year and a half later? The contractor should be held liable for something... like not requesting in the first place? I had no employees, only was on the job for one day (thank god) and only received half of what I worked for? I have to file or get fined.... so they can get the rest of their money but yet I only got half of what they owed me? Thanks!</text_data><comment_date>2011-09-06T00:00:00</comment_date></row><row _id="row-73bi_y4yh~ifcx" _uuid="00000000-0000-0000-87B4-3D6B8BB6B6A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73bi_y4yh~ifcx"><intent_id>583320</intent_id><project_id>716228</project_id><text_data>Work is being performed in our shop located in Seattle and final product is being shipped to Cowlitz Falls</text_data><comment_date>2013-07-25T00:00:00</comment_date></row><row _id="row-jyi3-wyk3~nza5" _uuid="00000000-0000-0000-9E2E-E9511EEA8063" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jyi3-wyk3~nza5"><intent_id>1143750</intent_id><project_id>947439</project_id><comment_date>2021-05-11T00:00:00</comment_date></row><row _id="row-vxa3~9t88-jmib" _uuid="00000000-0000-0000-1518-D3B24783B0B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vxa3~9t88-jmib"><intent_id>1029077</intent_id><project_id>903146</project_id><text_data>1. Repairs to residential structures. 2. Yes 3. 1 4. A-No, B-No, C-Yes, D-No, E-No, F-No, G-No, H-No, I-No, J-No, K-No, I-No 5. Yes 6. Yes 7. No8. No</text_data><comment_date>2019-12-30T00:00:00</comment_date></row><row _id="row-jmpp_qyn3~cpdi" _uuid="00000000-0000-0000-392F-5E17E4FDD365" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jmpp_qyn3~cpdi"><intent_id>619935</intent_id><project_id>667758</project_id><text_data>dump truck</text_data><comment_date>2014-03-12T00:00:00</comment_date></row><row _id="row-6w56-96e6.5he2" _uuid="00000000-0000-0000-6FE6-2BE732D9C6AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6w56-96e6.5he2"><intent_id>1074335</intent_id><project_id>926422</project_id><text_data>Delivery date: 8/14/2020.  Work will be performed in Douglas County.</text_data><comment_date>2020-07-22T00:00:00</comment_date></row><row _id="row-ydbb-76e7.tpa4" _uuid="00000000-0000-0000-3713-6C36D7D4E9BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ydbb-76e7.tpa4"><intent_id>1150801</intent_id><project_id>955654</project_id><text_data>Operator: Welfare: $9.07; Pension $13.40; Apprenticeship: $0.70; Training: 0.70; Union dues: $0.50Laborer: Welfare: $7.20; Pension: $5.04; Training: $0.95; Credit union: $1.05; Union Dues: $2.07</text_data><comment_date>2021-06-21T00:00:00</comment_date></row><row _id="row-antg.fbjz_7trm" _uuid="00000000-0000-0000-49E7-775D445701D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-antg.fbjz_7trm"><intent_id>733616</intent_id><project_id>776989</project_id><text_data>Owner Operated</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-rycr-fc4x_5xst" _uuid="00000000-0000-0000-BC5F-8120356877A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rycr-fc4x_5xst"><intent_id>1043421</intent_id><project_id>887556</project_id><text_data>GU Job #20031</text_data><comment_date>2020-03-05T00:00:00</comment_date></row><row _id="row-t9xm_vx97_5jja" _uuid="00000000-0000-0000-87A0-C8341351EB30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9xm_vx97_5jja"><intent_id>778507</intent_id><project_id>792525</project_id><text_data>Type of work is Refrigerant AbatementTool used is an El MachinoA hose is attached to the appliance (i.e. McQuay Chiller) then to recovery machine (El Machino) which condenses the gas to a liquid and pumped into a refrigerant cylinder according to EPA regulationsWe do not do any repairs of any kind on any job site. The only service we provide is to recover the refrigerant put it in our cylinder and take the cylinder off site to our shop where it is later reclaimed.</text_data><comment_date>2016-07-29T00:00:00</comment_date></row><row _id="row-2a5p.zbx5_3evn" _uuid="00000000-0000-0000-E4D2-F741F329835F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2a5p.zbx5_3evn"><intent_id>739268</intent_id><project_id>770285</project_id><text_data>Filed by Cal Melton</text_data><comment_date>2015-12-28T00:00:00</comment_date></row><row _id="row-8u5z.tpz6.6gjb" _uuid="00000000-0000-0000-1EC5-620C5E9AAB56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8u5z.tpz6.6gjb"><intent_id>470871</intent_id><project_id>671811</project_id><text_data>061023</text_data><comment_date>2011-08-08T00:00:00</comment_date></row><row _id="row-q5f3~w7w4_yr2s" _uuid="00000000-0000-0000-1FE0-65DF0AB17624" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5f3~w7w4_yr2s"><intent_id>1145781</intent_id><project_id>962965</project_id><text_data>POWERCOM JOB #959606</text_data><comment_date>2021-05-19T00:00:00</comment_date></row><row _id="row-rw5t.874x~agaa" _uuid="00000000-0000-0000-F2BE-6538024267B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rw5t.874x~agaa"><intent_id>812560</intent_id><project_id>808465</project_id><text_data>097007</text_data><comment_date>2017-01-24T00:00:00</comment_date></row><row _id="row-276w_e537_4t5f" _uuid="00000000-0000-0000-2563-34223B09EF15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-276w_e537_4t5f"><intent_id>846651</intent_id><project_id>826822</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2017-07-11T00:00:00</comment_date></row><row _id="row-ywma_d8tm~bvif" _uuid="00000000-0000-0000-4ADA-74D637D3A0AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ywma_d8tm~bvif"><intent_id>1164476</intent_id><project_id>970252</project_id><text_data>0221034</text_data><comment_date>2021-07-28T00:00:00</comment_date></row><row _id="row-hscu_baai~267p" _uuid="00000000-0000-0000-DA35-C33DFD6EE34D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hscu_baai~267p"><intent_id>675219</intent_id><project_id>753912</project_id><text_data>The work we are doing has nothing to do with the following services: (a) Radio, television and recording systems and devices; (b) Systems for paging, intercommunication, public address, wired music, clocks, security and surveillance systems and mobile radio systems; and (c) Fire alarm and burglar systems. Electronic Technicians may also perform certain low-voltage work on HVAC systems.We are setting up wireless hardware which are to be used for internet access � not �paging, intercommunication, public address, wired music, clocks, security and surveillance systems and mobile radio systems, fire alarm or burglar systems or HVAC systems�.</text_data><comment_date>2015-01-28T00:00:00</comment_date></row><row _id="row-qr36.b6ve.8yi9" _uuid="00000000-0000-0000-25B1-775837EB2AAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qr36.b6ve.8yi9"><intent_id>592807</intent_id><project_id>719627</project_id><text_data>Filed by Jim Garner.Work performed: Lawncare, mowing, pruning, edging, debris removal (plants, shrubs, leaves) on a regular schedule.Tools/Equipment: Lawn mowers, Edgers, Blowers, Pick up Truck</text_data><comment_date>2013-09-10T00:00:00</comment_date></row><row _id="row-89zn-58jp~6t3u" _uuid="00000000-0000-0000-BEF8-C3A3BC8631C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89zn-58jp~6t3u"><intent_id>832209</intent_id><project_id>820422</project_id><text_data>Telephone/data cablingElect Tech(06)Inside/outside work</text_data><comment_date>2017-05-10T00:00:00</comment_date></row><row _id="row-zvgh.xt58_kjf6" _uuid="00000000-0000-0000-689E-E43D546259B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zvgh.xt58_kjf6"><intent_id>1057015</intent_id><project_id>915002</project_id><text_data>Fringe Breakdown: Operators Union- *2 operators union members who may drive a truck on this project* Health &amp; Security = $8.07 Pension = $12.40 Apprenticeship Training/Retraining = $.70 National Training = $.05 Total = $21.22 Teamsters Union Health &amp; Security = $10.78 Pension = $8.98 Apprenticeship = $.70 Total = $20.46 Laborers Union Health &amp; Welfare = $6.50 Pension = $4.54 Training = $.90 NWLECET = $.14 WCISAP = $.06 Total = $12.14</text_data><comment_date>2020-05-11T00:00:00</comment_date></row><row _id="row-4aad_egvy_dq6d" _uuid="00000000-0000-0000-0A88-2CA1C692E88F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4aad_egvy_dq6d"><intent_id>690593</intent_id><project_id>760053</project_id><text_data>Form filed by:  Richard C. Kilpatrick</text_data><comment_date>2015-04-23T00:00:00</comment_date></row><row _id="row-7t4q-x9i9_i63s" _uuid="00000000-0000-0000-C906-0BD321BFD7B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7t4q-x9i9_i63s"><intent_id>670113</intent_id><project_id>750897</project_id><text_data>#1 - Describe the work that your firm was contracted to perform? Weatherization #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single Family #3 - Including any basement or garage, how many stories or levels does the structure have? 1  #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No (b) Any retail use in the structure? No (c) Permanent residence only? Yes (d) Rehabilitation house? No (e) Transitional housing? No (f) Communal dining facility? No (g) Treatment services? No (h) Dormitories? No (i) Counseling? No (j) Is each room and/or bed in the structure rented separately? No (k) Other? No #5 - Does each dwelling unit have its own self-contained kitchen? Yes #6 - Does each dwelling unit have its own bathroom? Yes #7 - Is there a community facility or manager�s office on site? No #8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2014-12-16T00:00:00</comment_date></row><row _id="row-9v7m-t2pz_awid" _uuid="00000000-0000-0000-D358-494BDFCADCF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9v7m-t2pz_awid"><intent_id>840690</intent_id><project_id>824427</project_id><text_data>Job #817-0361</text_data><comment_date>2017-06-14T00:00:00</comment_date></row><row _id="row-sfb6-45bh~233u" _uuid="00000000-0000-0000-55EC-96F2FC37E285" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sfb6-45bh~233u"><intent_id>582253</intent_id><project_id>695636</project_id><text_data>Filed by Ken Matthews</text_data><comment_date>2013-07-23T00:00:00</comment_date></row><row _id="row-9a6x.6zx3-p9ic" _uuid="00000000-0000-0000-3C2D-26A133428DCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9a6x.6zx3-p9ic"><intent_id>700421</intent_id><project_id>764744</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-06-12T00:00:00</comment_date></row><row _id="row-9h32.783z-4tn5" _uuid="00000000-0000-0000-F30C-7402CB614427" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9h32.783z-4tn5"><intent_id>670892</intent_id><project_id>751274</project_id><text_data>Mowing, trimming, pruning, weeding, raking, blowing debris and removing. Using power tools and hand tools: Mowers, line trimmers , hedge shears, backpack blowers, rakes and hoes.</text_data><comment_date>2014-12-22T00:00:00</comment_date></row><row _id="row-wfk9_qkf7-w8pk" _uuid="00000000-0000-0000-C155-DC18ABB15923" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wfk9_qkf7-w8pk"><intent_id>763119</intent_id><project_id>777732</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2016-05-26T00:00:00</comment_date></row><row _id="row-5ce2~qpmg~dcip" _uuid="00000000-0000-0000-6B36-7085E88E66A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ce2~qpmg~dcip"><intent_id>1213790</intent_id><project_id>990821</project_id><text_data>Please describe the whole project � Perform mitigation and reconstruction in the CTE building of Ferndale High School. This consists of controlled demolition, content manipulation, drying the structure, re-construction, and cleaning/disinfecting.	B) Please describe your part(s) of the project. � Temp labor will be doing controlled demolition, content manipulation and cleaning/disinfecting.	C) Please specifically describe the duties being performed by the General Laborer and any tools, equipment, or vehicles used. � 	      - Controlled demolition: Removal of building materials affected by flood, bagging, and disposing of debris in the on-site dumpster. Tools used for this are, chalk line, tape measure, drywall saw, hammer, pry bar, drill, hand trucks, broom, scoop shovel, dustpan, floor scraper, screwdriver, plyers, ladders, and vacuum.	      - Content manipulation: Moving and storing contents from the classrooms into containers for storage then moving the contents back into the classrooms when the construction has been completed. Tools used for this are, 4-wheel dollies, hand trucks.	      - Cleaning &amp; disinfecting: vacuuming dust and debris, sweeping dust and debris, mopping floors, wet wiping stud bays, walls, cabinets, and contents. Tools used for this are, ladders, buckets, broom, scoop shovel, dustpan, mop and bucket, vacuum�s, scrapers, and dust mop.</text_data><comment_date>2022-03-28T00:00:00</comment_date></row><row _id="row-rz44_bc4q_dcwt" _uuid="00000000-0000-0000-F377-50CF188856C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rz44_bc4q_dcwt"><intent_id>511336</intent_id><project_id>687438</project_id><text_data>General Laborers will be doing minor demolition and clean-up</text_data><comment_date>2012-05-30T00:00:00</comment_date></row><row _id="row-jzyn~twnk-hvsy" _uuid="00000000-0000-0000-CA4F-73E82A71CF10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzyn~twnk-hvsy"><intent_id>1062933</intent_id><project_id>915081</project_id><text_data>TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2020-06-05T00:00:00</comment_date></row><row _id="row-xtr5-33ah-84ez" _uuid="00000000-0000-0000-D31D-BB262F3B751B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xtr5-33ah-84ez"><intent_id>1196062</intent_id><project_id>989692</project_id><text_data>Project# 03490, Vela, Tena, 13906 E 21st Ave, Spokane Valley, WA 99037</text_data><comment_date>2021-11-30T00:00:00</comment_date></row><row _id="row-f3yu.ix43~8x6y" _uuid="00000000-0000-0000-A556-0321D8609CA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f3yu.ix43~8x6y"><intent_id>727380</intent_id><project_id>752355</project_id><text_data>Job # 9026113</text_data><comment_date>2015-10-20T00:00:00</comment_date></row><row _id="row-yh2h.y9bc~tr43" _uuid="00000000-0000-0000-708A-6CE7FD646FD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yh2h.y9bc~tr43"><intent_id>806036</intent_id><project_id>804788</project_id><text_data>Heritage Landscaping will be providing all landscaping for this project, including planting, sod installation and irrigation system installation</text_data><comment_date>2016-12-07T00:00:00</comment_date></row><row _id="row-jhyb~pdpm~jud9" _uuid="00000000-0000-0000-3C66-A29FC682CC66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jhyb~pdpm~jud9"><intent_id>733265</intent_id><project_id>777662</project_id><text_data>Emergency repairs</text_data><comment_date>2015-11-29T00:00:00</comment_date></row><row _id="row-g47b~ksst.vkdz" _uuid="00000000-0000-0000-5AE9-E99E6B4E44AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g47b~ksst.vkdz"><intent_id>506130</intent_id><project_id>678503</project_id><text_data>Laborers to apply Tnemec coating by hand to interior of Manhole structures</text_data><comment_date>2012-04-02T00:00:00</comment_date></row><row _id="row-cem8-agec.tgz4" _uuid="00000000-0000-0000-BE19-3CAD73BBE853" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cem8-agec.tgz4"><intent_id>900424</intent_id><project_id>849101</project_id><text_data>WO# 4716</text_data><comment_date>2018-04-24T00:00:00</comment_date></row><row _id="row-cvgm~36b7~cpqd" _uuid="00000000-0000-0000-01E6-8C912BDE4B51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cvgm~36b7~cpqd"><intent_id>1388476</intent_id><project_id>1101531</project_id><text_data>123104-001</text_data><comment_date>2023-12-17T00:00:00</comment_date></row><row _id="row-bd4d~4epg~uxnc" _uuid="00000000-0000-0000-1D96-95F514B775F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bd4d~4epg~uxnc"><intent_id>1230413</intent_id><project_id>1011321</project_id><text_data>PO Continues 2000406338, 2000406339, 2000406340, 2000406341</text_data><comment_date>2022-05-03T00:00:00</comment_date></row><row _id="row-zte8.ctzw~awpx" _uuid="00000000-0000-0000-57AF-F9C1B235AEC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zte8.ctzw~awpx"><intent_id>586057</intent_id><project_id>716721</project_id><text_data>NEBF-           $1.26Edison Pension- $5.159th District -  $3.42</text_data><comment_date>2013-08-09T00:00:00</comment_date></row><row _id="row-pzkv.cupf.67dc" _uuid="00000000-0000-0000-7E97-4748DCF3B77B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pzkv.cupf.67dc"><intent_id>976281</intent_id><project_id>880453</project_id><text_data>1. 200 4TH ST, MATTAWA2. 1410 CHERRY AVE, YAKIMA3. 3701 GUN CLUB RD #38,YAKIMA4. 317 S 9TH ST, YAKIMA5. 713 NORTH 4TH ST, YAKIMA6. 6421 W COLUMBUS ST, YAKIMA7. 609 S NACHES AVE, YAKIMA8. 611 LOCUST AVE, YAKIMA9. 2901 S 3RD ST, UNION GAP</text_data><comment_date>2019-05-07T00:00:00</comment_date></row><row _id="row-q4g7.e8fg-b9qs" _uuid="00000000-0000-0000-89E0-2479305AB224" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q4g7.e8fg-b9qs"><intent_id>727864</intent_id><project_id>775223</project_id><text_data>Unit B 108 new tub surround installed.</text_data><comment_date>2015-10-22T00:00:00</comment_date></row><row _id="row-4kmb-xnia_vkqf" _uuid="00000000-0000-0000-6188-DA57AE80FB3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4kmb-xnia_vkqf"><intent_id>1140125</intent_id><project_id>959940</project_id><text_data>ICI Job # 1305</text_data><comment_date>2021-04-27T00:00:00</comment_date></row><row _id="row-sjeg_2wcf.qq5d" _uuid="00000000-0000-0000-8D4E-95B1885B1781" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sjeg_2wcf.qq5d"><intent_id>670899</intent_id><project_id>751280</project_id><text_data>Fringe breakdown;NW Pension $6.93, Apprentice $1.15, Health Care/VEB $10.28, Org. Trust $1.00, Ind. Fund $0.65, Natl. Pension $4.24, ITI $0.12, NEMI $0.03, SMOHI $0.02, NW Supplemental $0.79, Clean Card $0.02.Total Package with wage is 70.37</text_data><comment_date>2014-12-22T00:00:00</comment_date></row><row _id="row-btrr.qq9i_3uf3" _uuid="00000000-0000-0000-60A0-FBAA7366E40E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-btrr.qq9i_3uf3"><intent_id>669252</intent_id><project_id>739823</project_id><text_data>A) The project is the construction of a automatic car wash facility at Spokane International Airport with asphalt parking lot and landscaping.B) The project has an irrigation system and landscaping consisting of 6-inches of top soil, trees and plants, and 3-inches of mulch topdressing. Aqua Pacific Landscape is providing the &amp;#39;B&amp;#39; portion of the project.</text_data><comment_date>2014-12-12T00:00:00</comment_date></row><row _id="row-ddip.3n9p-fdi8" _uuid="00000000-0000-0000-0119-E6D039B04E04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ddip.3n9p-fdi8"><intent_id>853490</intent_id><project_id>829451</project_id><text_data>Filed by Tom Romulus</text_data><comment_date>2017-08-08T00:00:00</comment_date></row><row _id="row-u95p.4rbt.9rxv" _uuid="00000000-0000-0000-2F4F-EC85A4C8A5FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u95p.4rbt.9rxv"><intent_id>841649</intent_id><project_id>818680</project_id><text_data>JCI Project 7N54-0084</text_data><comment_date>2017-06-19T00:00:00</comment_date></row><row _id="row-2859-8jwb_jxvn" _uuid="00000000-0000-0000-65A4-D8DFC437F7C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2859-8jwb_jxvn"><intent_id>767215</intent_id><project_id>788414</project_id><text_data>(1)INSULATION (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO,B-NO,C-YES,D-NO, E-NO,F-NO,G-NO,H-NO,I-NO,J-NO,K-?, (5)YES (6)YES (7)NO (8)NO</text_data><comment_date>2016-06-09T00:00:00</comment_date></row><row _id="row-uqra.yd3a~mw7k" _uuid="00000000-0000-0000-BD9B-8428A48EBD34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uqra.yd3a~mw7k"><intent_id>765884</intent_id><project_id>791245</project_id><text_data>Filed by Angel YoungThis project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2016-06-02T00:00:00</comment_date></row><row _id="row-7bjf~bceh.r6k4" _uuid="00000000-0000-0000-D174-18B12D3B7D44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7bjf~bceh.r6k4"><intent_id>1201850</intent_id><project_id>993372</project_id><text_data>Replace furnace. 2. Mobile home. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2021-12-29T00:00:00</comment_date></row><row _id="row-i48d~8qfw~9upf" _uuid="00000000-0000-0000-8DF1-6F219ACA4091" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i48d~8qfw~9upf"><intent_id>981663</intent_id><project_id>882804</project_id><text_data>000504-149-00</text_data><comment_date>2019-05-31T00:00:00</comment_date></row><row _id="row-xb82~6d6w_rwxn" _uuid="00000000-0000-0000-E3AC-9C217EF1900B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xb82~6d6w_rwxn"><intent_id>980793</intent_id><project_id>849303</project_id><text_data>This replaces Intent #905608 which was filed with the wrong County</text_data><comment_date>2019-05-29T00:00:00</comment_date></row><row _id="row-dycr.7pzp-qgg2" _uuid="00000000-0000-0000-5289-2590E872EE21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dycr.7pzp-qgg2"><intent_id>597994</intent_id><project_id>721490</project_id><text_data>Filed by Todd Love.</text_data><comment_date>2013-10-07T00:00:00</comment_date></row><row _id="row-fx9a_vmv9-6b7w" _uuid="00000000-0000-0000-4029-7C7DD7B50B5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fx9a_vmv9-6b7w"><intent_id>740911</intent_id><project_id>772378</project_id><text_data>Blanca Morales1805 W Plath AveYakima,WA 98902#1 Install Bath fan/light 2 wall heaters &amp; J-boxes for open splices #2 Single Family dwelling #3 unknown story BLDG #4(a)no (b)no (c)yes (d)no (e)no (f)no (g)no (h)no (i)no (j)no(k)no #5 1 family dwelling kitchen #6 1 family dwelling bathroom #7 no places #8 no public use.</text_data><comment_date>2016-01-09T00:00:00</comment_date></row><row _id="row-fned~fqnk.3u63" _uuid="00000000-0000-0000-5B8B-5D3975D6D664" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fned~fqnk.3u63"><intent_id>1016418</intent_id><project_id>896598</project_id><text_data>615544601   WSU STIMSON HALL FA  PO#  F815734</text_data><comment_date>2019-10-18T00:00:00</comment_date></row><row _id="row-3h2r_est5~h8ed" _uuid="00000000-0000-0000-5366-D04FCB6D410D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3h2r_est5~h8ed"><intent_id>1116026</intent_id><project_id>936487</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications fiber optic cabling for data (computer networking) indoors. POWERCOM JOB# 451479</text_data><comment_date>2021-01-19T00:00:00</comment_date></row><row _id="row-h947~pc5y_nwzh" _uuid="00000000-0000-0000-E5D0-92EE8BD66B94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h947~pc5y_nwzh"><intent_id>1231596</intent_id><project_id>1012010</project_id><text_data>The Truck Driver rate is paid to employees while driving company issued, Cargo Vans and/or medium-sized Pickup Trucks to transport materials/supplies to the job site.</text_data><comment_date>2022-05-06T00:00:00</comment_date></row><row _id="row-arw2-ppbr.apar" _uuid="00000000-0000-0000-AB36-663DD28B1848" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-arw2-ppbr.apar"><intent_id>880676</intent_id><project_id>840146</project_id><text_data>#1 - Install ductless heat pumps, replace exhaust fans, install exhaust ducting. #2 - apartments #3 - 3 #4 - What is the building used for? (a) No (b) No (c) Yes (d) No (e) No (f) No (g) Bi (h) No (I) No (j) No (k) No (l) NA #5 - Yes #6 - Yes #7 NO #8 - No</text_data><comment_date>2017-12-22T00:00:00</comment_date></row><row _id="row-a3xx-6t2m.crcy" _uuid="00000000-0000-0000-0F24-704C959E2724" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a3xx-6t2m.crcy"><intent_id>1098271</intent_id><project_id>930266</project_id><text_data>In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions in the notes section at the bottom of this screen: #1 - Describe the work that your firm was contracted to perform. HVAC Clean and tune #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? yes #3 - Including any basement or garage, how many stories or levels does the structure have? 1 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no (b) Any retail use in the structure? no (c) Permanent residence only? yes (d) Rehabilitation house? no (e) Transitional housing? no (f) Communal dining facility? no (g) Treatment services? no (h) Assisted living services? no (I) Dormitories? no (j) Counseling? no (k) Is each room and/or bed in the structure rented separately? no (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? yes #6 - Does each dwelling unit have its own bathroom? yes #7 - Is there a community facility or manager�s office on site? no #8 - Is any part of the structure used by members of the public?no</text_data><comment_date>2020-10-23T00:00:00</comment_date></row><row _id="row-adya~suw7.mri5" _uuid="00000000-0000-0000-6E60-02794E551C49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-adya~suw7.mri5"><intent_id>639567</intent_id><project_id>733898</project_id><text_data>� Erect and repair guard rails, median rails, guide and reference posts, sign posts and right of way markers along highways.� Mix, pour and spread asphalt, gravel and other materials, using hand tools, and mix, pour, spread and rod concrete.� Lift, carry and hold building materials, tools and supplies.� Measure distances from grade stakes, drive stakes and stretch tight line.� Bolt, nail, align and block up under forms.� Signal operators of construction equipment to facilitate alignment, movement and adjustment of machinery to conform to grade specifications.� Level earth to fine grade specifications, using pick and shovel.� Mix concrete, using portable mixer.� Erect scaffolding, shoring and braces.� Mop, or spread bituminous compounds over surfaces for protection (outside buildings).� Spray material such as water, sand, steam, vinyl, or stucco through hoses to clean, coat or seal surfaces.� Apply caulking compounds by hand or with caulking gun to seal crevices.� The application of penetrating sealer and primer protective coatings to concrete floors and steps when safe to walk on.The cleaning and grinding of concrete floors and walls by high pressure waterblasting or sandblasting preparatory to the application of waterproofing.� The removing of rough or defective spots from concrete surfaces, using grinder or chisel and hammer and patching holes with fresh concrete or epoxy compound when not preparatory to sacking (finishing a large surface of patched holes).� The setting of concrete curb, gutter and sidewalk forms as a composite crew with cement masons.� The laying of concrete, granite and brick pavers in beds of sand.All clean-up work required in connection with the above work. Clean tools, equipment, materials and work areas.</text_data><comment_date>2014-07-09T00:00:00</comment_date></row><row _id="row-9cc4~x5px-gbm4" _uuid="00000000-0000-0000-CC32-7399D55A0976" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9cc4~x5px-gbm4"><intent_id>577212</intent_id><project_id>714029</project_id><text_data>State of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- Kent SD Carriage Crest ElementaryPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you Claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.)	What is the purpose of this project?Update the security alarm system and access controls for all Kent School District schools and administrative building.2.)	Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)]No.3.)	Does this project entail the remodeling or new construction of a facility?No. 4.)	If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.Burglar alarm system.5.)	What specific tasks will your employees use in the performance of those tasks?Siemens� SES Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the SES Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The SES Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the SES Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, SES Technicians do not use trade tools, such as drills or wrenches.  6.)	What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.)	If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.)	Are you going to be hiring any subcontractors for this project?Yes. To expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves.</text_data><comment_date>2013-06-24T00:00:00</comment_date></row><row _id="row-uc6r-t3e2-a28n" _uuid="00000000-0000-0000-0C0B-FC94729A138A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uc6r-t3e2-a28n"><intent_id>502523</intent_id><project_id>677510</project_id><text_data>1) no2) no3a) no3b) no3c) no3d) no3e) no3f) no3g) school4) no5) no6) no7) yes</text_data><comment_date>2012-03-05T00:00:00</comment_date></row><row _id="row-z27f_8w34.h9my" _uuid="00000000-0000-0000-7765-99E5736D0DED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z27f_8w34.h9my"><intent_id>454187</intent_id><project_id>613414</project_id><text_data>This is for the Burien Library - 6th SW</text_data><comment_date>2011-05-04T00:00:00</comment_date></row><row _id="row-x3v4_z5p3_e7y6" _uuid="00000000-0000-0000-0CC6-FA90535514CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3v4_z5p3_e7y6"><intent_id>768853</intent_id><project_id>794680</project_id><text_data>Truck Drivers &amp;quot;Other Trucks&amp;quot; classification is for Lowboy, Sweeper &amp; Water Trucks</text_data><comment_date>2016-06-16T00:00:00</comment_date></row><row _id="row-i97w_9s4s~qrz9" _uuid="00000000-0000-0000-230B-83E2A68B9265" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i97w_9s4s~qrz9"><intent_id>587750</intent_id><project_id>717804</project_id><text_data>Wheelabrator Spokane is the actual prime contractor</text_data><comment_date>2013-08-14T00:00:00</comment_date></row><row _id="row-af3n~6pgz~asmz" _uuid="00000000-0000-0000-0A96-5D751137B3F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-af3n~6pgz~asmz"><intent_id>1049964</intent_id><project_id>862739</project_id><text_data>New intent has Snohomish County and additional trades added, once this intent is approved we will request to have intent 953992 deleted.</text_data><comment_date>2020-04-07T00:00:00</comment_date></row><row _id="row-m4t2_fn66.y4t7" _uuid="00000000-0000-0000-EDE4-F4030EBA4ADD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m4t2_fn66.y4t7"><intent_id>568917</intent_id><project_id>710731</project_id><text_data>Job # 917784</text_data><comment_date>2013-05-10T00:00:00</comment_date></row><row _id="row-bikp~xvz7.qxa3" _uuid="00000000-0000-0000-F68B-78D512DC8DC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bikp~xvz7.qxa3"><intent_id>671278</intent_id><project_id>749263</project_id><text_data>Install Insulation, Single Family, Two Story, No, No, Yes, No, No, No, No, No, No, No, No,Yes, Yes, No, No.</text_data><comment_date>2014-12-26T00:00:00</comment_date></row><row _id="row-a3u7~299v~6en9" _uuid="00000000-0000-0000-4B11-7633ECC266DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a3u7~299v~6en9"><intent_id>1208897</intent_id><project_id>997948</project_id><text_data>1.Weatherization 2. single family 3. 1 4. Aa0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2022-02-02T00:00:00</comment_date></row><row _id="row-gehc.r9vt_ez9e" _uuid="00000000-0000-0000-055F-5942C88E74FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gehc.r9vt_ez9e"><intent_id>1125166</intent_id><project_id>952254</project_id><text_data>Service Due in April and October 2021</text_data><comment_date>2021-02-26T00:00:00</comment_date></row><row _id="row-9q9v.5qdj_xbtk" _uuid="00000000-0000-0000-FCAD-92CEB95254FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9q9v.5qdj_xbtk"><intent_id>499784</intent_id><project_id>679992</project_id><text_data>Residential Rate Prevailing wage determinationIn order for us to determine if the residential rate is appropriately applied, please specifically answer the following questions about the facility: #1 - Is the structure a single family dwelling, duplex, apartment, condominium or other residential structure? Yes #2 - Including any basement or garage, how many stories or levels does the structure have? 1+ #3 - What is the facility used for?  --Answer �yes� or �no� to each of the following options: (a) Permanent residence only? Yes (b) Rehabilitation house? No (c) Transitional housing? No (d) Communal dining facility? No (e) Treatment services? No (f) Counseling? No (g) Other? No #4 - Does each dwelling unit have its own self-contained kitchen? Yes #5 - Does each dwelling unit have its own bathroom? Yes #6 - Is there a community facility or manager�s office on site? No #7 - Is any part of the facility used by members of the public? No</text_data><comment_date>2012-02-09T00:00:00</comment_date></row><row _id="row-u24h-4cgn-2etm" _uuid="00000000-0000-0000-F434-BE9969386744" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u24h-4cgn-2etm"><intent_id>629657</intent_id><project_id>724146</project_id><text_data>From: Lori Sullivan [mailto:lori@evergreenerectors.com] Sent: Monday, June 02, 2014 3:03 PMTo: Herman, Laura E (LNI)Cc: 'Sharon Bruner'; Christine.Wulfert@Mortenson.comSubject: Intent #629657Laura, Can you please revise to add &amp;quot;This intent is for BP #306&amp;quot; in the Public Notes area? Thank you very much.   Thanks, Lori SullivanVice PresidentEvergreen Erectors, Inc.lori@evergreenerectors.com(425)697-2189 office (206)423-2561 cell</text_data><comment_date>2014-06-02T00:00:00</comment_date></row><row _id="row-rz77~4jnw-7am3" _uuid="00000000-0000-0000-EE42-1C9D1126ACB4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rz77~4jnw-7am3"><intent_id>1219020</intent_id><project_id>992268</project_id><text_data>Installation of irrigation; delivery of soil; delivery and planting of various trees, shrubs, and ground cover; mulch delivery and application; metal edging installation.Equipment- hand tools such as shovelsEquipment- possible trencher</text_data><comment_date>2022-03-18T00:00:00</comment_date></row><row _id="row-dn87-ziav~p3u8" _uuid="00000000-0000-0000-BBD3-46DD9906E7EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dn87-ziav~p3u8"><intent_id>1219201</intent_id><project_id>1004499</project_id><text_data>Please note this information is intended for projected/estimated for repairs/service/installs of kitchen equipment service prior to dispatching technicians and is based on the customer�s request for service. Submitted for the purpose of obtaining the L&amp;I �Intent� and compliance. Upon completion of the service request, we will file the �Avadavat� confirming actual services preformed, labor hours and notation of any additional tools used outside of the general tools listed below.    General tools used by our technicians for plumbing equipment service         Pipe wrench, channel locks, thread tape, silicone gun, Phillips�s screwdriver, flathead screwdriver, putty knife, ball pin hammer.   General tools used by our technicians for electrical component equipment service       Multi-Meter, insulated screwdriver, wire nuts, safety locks for lockout/tagout, insulated Allen wrenches.     General Installation tools used by our technicians:          cordless drill, multi screwdriver, ball pin hammer, small floor jack, silicone gun, floor dollies, channel locks, Sawzall, pry bar    All technicians use company supplied vehicles to arrive at job site</text_data><comment_date>2022-03-18T00:00:00</comment_date></row><row _id="row-qj6x-njcz.etne" _uuid="00000000-0000-0000-59A8-DB24EA16EBC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qj6x-njcz.etne"><intent_id>850805</intent_id><project_id>828425</project_id><text_data>Laurin MS &amp; Yacolt Primary - Low Voltage</text_data><comment_date>2017-07-27T00:00:00</comment_date></row><row _id="row-zmnv~sgjk-cpjg" _uuid="00000000-0000-0000-7056-BAC393D68F2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zmnv~sgjk-cpjg"><intent_id>1191260</intent_id><project_id>986847</project_id><text_data>ACI Job # 21-038</text_data><comment_date>2021-11-05T00:00:00</comment_date></row><row _id="row-4ebe-damz-iyvu" _uuid="00000000-0000-0000-8AFE-B3C8C102F00E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ebe-damz-iyvu"><intent_id>837467</intent_id><project_id>823148</project_id><text_data>Elect Tech(06)TelephoneCCTV LAN(Local Area Network)Computerinside and outside work</text_data><comment_date>2017-06-01T00:00:00</comment_date></row><row _id="row-73iq~8xfu.9dns" _uuid="00000000-0000-0000-2FC2-2722E152F243" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73iq~8xfu.9dns"><intent_id>811118</intent_id><project_id>811230</project_id><text_data>Margaret Carter is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be repairing the ceiling. This job meets the residential job requirements.</text_data><comment_date>2017-01-13T00:00:00</comment_date></row><row _id="row-5bhh_ykiz-479h" _uuid="00000000-0000-0000-206B-0948C65A78CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bhh_ykiz-479h"><intent_id>807630</intent_id><project_id>809572</project_id><text_data>The scope of work for maintenance services includes :  (This contract is for multiple sites which have different schedules but however the same work is performed, using the same tools.)Turf:Mowing � using regular push mowersTrimming � using a hand held 2 hp weed wackerEdging � using a hand held 2 hp edgerFertilizing � using a walk behind fertilizer spreaderHerbicide application � using back pack sprayer 4 gallonTREES, SHRUBS AND GROUND COVER BEDSWeeding � using hula hoes, a rake to pile up and hand stuffed into a garbage bag.Trimming Ground Cover � trimming/pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage can.Pruning Shrubs - trimming / pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage canPre-emergent Herbicide � hand held spreaderHARD SURFACES	Sweeping � using back pack air blowers Weeds � using back pack sprayer 4 gallonOTHERLeaf Removal � Raked into piles and placed into 30 gallon garbage cans.Litter � Picked up by hand and placed into garbage bags.ANNUAL FLOWER BEDSChange Annual Color � remove existing annual color with shovels, replace with new annual color and cover new material using shovel and rake bed using hand held rakes.Fertilizer � applied using a hand held spreaderGroom Annuals � no tools, hand groomingWeeding - no tools, hand weedingHerbicide � applied using back pack sprayersIRRIGATIONSystem Start-up � small shovel to remove dirt from system.Operate System � no toolsWinterize System � air compressor is used to blow system.All work is hauled off site with a F-350 Ford Truck.</text_data><comment_date>2016-12-18T00:00:00</comment_date></row><row _id="row-nrd2.vzwd-h55k" _uuid="00000000-0000-0000-A61E-5E1FC8D797F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrd2.vzwd-h55k"><intent_id>585670</intent_id><project_id>717068</project_id><text_data>Job # 8652</text_data><comment_date>2013-08-06T00:00:00</comment_date></row><row _id="row-wz89-aze3-3w42" _uuid="00000000-0000-0000-3CAF-CF14BAC9E08A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wz89-aze3-3w42"><intent_id>1048686</intent_id><project_id>914087</project_id><text_data>Weatherization. 1. Existing 3-Story Wood Frame Structure containing 16 residential units. Project consist of replacement of shingle roof, windows, Doors, WRB and exterior siding and trim. Site Improvements include fencing, relocation of sewer, parking restriping, updated fire alarm and addition of fire sprinkler system. 2.Apartment. 3. 3 4. a. no b. no c. no d. no e. no f. no g. no h. no i.no j.no k. yes 5. yes 6. yes 7. yes 8. no</text_data><comment_date>2020-03-31T00:00:00</comment_date></row><row _id="row-hubk.bj9h~4m4v" _uuid="00000000-0000-0000-2DDF-F4ADC701D5DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hubk.bj9h~4m4v"><intent_id>1072307</intent_id><project_id>881939</project_id><text_data>sweeper using a truck mounted sweeper</text_data><comment_date>2020-07-14T00:00:00</comment_date></row><row _id="row-t7zg-skdh~k47c" _uuid="00000000-0000-0000-4F89-0C7BCEFEA66A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t7zg-skdh~k47c"><intent_id>542789</intent_id><project_id>699004</project_id><text_data>Single family dwelling. Repair rotted floor #2 Single family dwelling # 3 single story #4 A single family dwelling. a. no b. no c. yes d. no. e. no. f.no g. no. h. no. i. no. j. no. k.no. 5.yes 6.yes 7.no 8.noThe residential laborer is an assitant only packing lumber, scrap and clean up.</text_data><comment_date>2012-11-06T00:00:00</comment_date></row><row _id="row-cm2r-kqhp~vczi" _uuid="00000000-0000-0000-9CC7-D9C67DE7AE1F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cm2r-kqhp~vczi"><intent_id>944330</intent_id><project_id>858089</project_id><text_data>-- On 8/17/2018:-- Wage: 53.67, Total Benefits:28.84 Total. National Pension 4.24, International Training .17, NW Pension 8.50, Health Care 12.32, Apprenticeship Fund 1.10, Industry Fund .65, Orga. Trust Fund 1.00, NW Supplemental Plan .79, Clean Card 0.07</text_data><comment_date>2018-11-06T00:00:00</comment_date></row><row _id="row-zvwv~uin3.igab" _uuid="00000000-0000-0000-008E-C688B1272722" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zvwv~uin3.igab"><intent_id>1123006</intent_id><project_id>942419</project_id><text_data>The treatment is a process called air stripping. We supplied a 20' long piece of sch 40 PVC with number 10 well screen slots to Marshbank. They installed it in the bottom of an open air settling tank. We hooked a 200 CFM air compressor to the line. We open a 1/2' valve to push air into the water. The high pressure rapid air produces evaporation of light petroleum. Our employees use a hand held turbidity meter to figure NTU value. There is nothing more than standing and watching water bubble. Once the visual sheen is gone they place absorbent booms to remove residual. Than the water is taken to a lab for sampling. There us truly no labor involved. This is a consultant service the same as the environmental engineer or geotech onsite watching backfill or taking soil samples.</text_data><comment_date>2021-03-03T00:00:00</comment_date></row><row _id="row-643f~3bre~v8cb" _uuid="00000000-0000-0000-B485-0128C68375F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-643f~3bre~v8cb"><intent_id>619979</intent_id><project_id>730805</project_id><text_data>Several manufactured homes within the River Gardens MHP		#1 - Heating duct sealing. #2 - Single family manufactured home? #3 - 1 level? #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - Unknown #8 - No</text_data><comment_date>2014-03-12T00:00:00</comment_date></row><row _id="row-p7ec.ttk6.dums" _uuid="00000000-0000-0000-B217-EBB35AF97420" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7ec.ttk6.dums"><intent_id>558616</intent_id><project_id>705940</project_id><text_data>Start date is an estimate.</text_data><comment_date>2013-03-05T00:00:00</comment_date></row><row _id="row-pt3b.yipu.qzvh" _uuid="00000000-0000-0000-E6CA-D3627873B6DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pt3b.yipu.qzvh"><intent_id>714521</intent_id><project_id>763963</project_id><text_data>Filed by Glen Murray</text_data><comment_date>2015-08-14T00:00:00</comment_date></row><row _id="row-uc7x-ark8_safh" _uuid="00000000-0000-0000-02E5-5AA242245AFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uc7x-ark8_safh"><intent_id>522192</intent_id><project_id>691561</project_id><text_data>General Clean up of misc. items not assigned to others</text_data><comment_date>2012-07-17T00:00:00</comment_date></row><row _id="row-3v5b.4u8r.i8jq" _uuid="00000000-0000-0000-214D-9049F2955E33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3v5b.4u8r.i8jq"><intent_id>1448418</intent_id><project_id>1132390</project_id><text_data>125400-00 - Install fire sprinkler system.</text_data><comment_date>2024-07-20T00:00:00</comment_date></row><row _id="row-umzf.ka8i-d9nu" _uuid="00000000-0000-0000-463A-3E06C11AF5E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-umzf.ka8i-d9nu"><intent_id>487380</intent_id><project_id>676121</project_id><text_data>Health &amp; Welfare  =  $7.23Pensions  =  $13.91Vacation  =  $0.00Apprentice Training = $.48Other Bona Fide Fringes = $.45</text_data><comment_date>2011-11-03T00:00:00</comment_date></row><row _id="row-9ybp-yrmq_ws3r" _uuid="00000000-0000-0000-76D5-BD2BC080EE03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ybp-yrmq_ws3r"><intent_id>1274013</intent_id><project_id>1035005</project_id><text_data>1. Weatherize Home2.Single Family Dwelling3.One Level4. a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no l.no5. yes6.yes7.no8.no</text_data><comment_date>2022-10-11T00:00:00</comment_date></row><row _id="row-mdvd-yy57-hhye" _uuid="00000000-0000-0000-1908-5D678FCCF551" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mdvd-yy57-hhye"><intent_id>597073</intent_id><project_id>721178</project_id><text_data>Installation of irrigation system in three planter beds to include trenching less than 3', shovels, rakes, hand spades, buckets, wheelbarrows, pipe cutters and pliers.</text_data><comment_date>2013-10-01T00:00:00</comment_date></row><row _id="row-kgz5~6uwk_awje" _uuid="00000000-0000-0000-5A18-6DF6A143862C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kgz5~6uwk_awje"><intent_id>602923</intent_id><project_id>719599</project_id><text_data>From: mikeswelding@comcast.net [mailto:mikeswelding@comcast.net] Sent: Tuesday, November 12, 2013 10:03 AMTo: Divine, Kellie (LNI)Subject: Re: Correction NoticeGood Morning, RE:  Intent ID 602923 The Signal Person, rate $42.46 what I indicated on our Intent, is actually classified as a:Laborer, Rigger, Signal Person. I just called your office and got help with confirming what needed to be corrected.Thank You for bringing this to my attention Sincerely, Michele Grate Johnson</text_data><comment_date>2013-11-12T00:00:00</comment_date></row><row _id="row-tctg~bkjg~9qyz" _uuid="00000000-0000-0000-FAC3-D39F25D417F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tctg~bkjg~9qyz"><intent_id>915216</intent_id><project_id>853278</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2018-07-01T00:00:00</comment_date></row><row _id="row-mkam-7yu8-in5e" _uuid="00000000-0000-0000-8267-3256C7C0176E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mkam-7yu8-in5e"><intent_id>623651</intent_id><project_id>731849</project_id><text_data>The work to be conducted is not filled with refrigerant. We are conducting a rigging operation with a boom truck. I can provide a detailed PDF of the work we will be completing if required.</text_data><comment_date>2014-04-23T00:00:00</comment_date></row><row _id="row-7zq6~rpmj~zge4" _uuid="00000000-0000-0000-640C-3B705DE33C6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zq6~rpmj~zge4"><intent_id>1157591</intent_id><project_id>968461</project_id><text_data>We subcontract owner/operator truck drivers to move modular buildings using their own truck and modular trailers from one location to another.</text_data><comment_date>2021-07-02T00:00:00</comment_date></row><row _id="row-6r9j.znpt~hmt3" _uuid="00000000-0000-0000-7196-D130A8570DF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6r9j.znpt~hmt3"><intent_id>519880</intent_id><project_id>690761</project_id><text_data>GENERAL LABOR FOR RAKING AGGREGATES OR OTHER WORK NOT IDENTIFIED SPECIFICALLY UNDER A DIFFERENT LABOR CATEGORY</text_data><comment_date>2012-06-29T00:00:00</comment_date></row><row _id="row-tett.mffh.ebng" _uuid="00000000-0000-0000-5AD7-6D4E938818C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tett.mffh.ebng"><intent_id>912551</intent_id><project_id>848655</project_id><text_data>C&amp;R Tractor will be using dump trucks and Truck Drivers on this project</text_data><comment_date>2018-06-20T00:00:00</comment_date></row><row _id="row-cdfq-f558~6au3" _uuid="00000000-0000-0000-795D-9115B9669159" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cdfq-f558~6au3"><intent_id>866814</intent_id><project_id>822725</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER.ACI JOB NO. 17-007</text_data><comment_date>2017-10-03T00:00:00</comment_date></row><row _id="row-xwi5_vfm9_qsq9" _uuid="00000000-0000-0000-F116-8962309B2D96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xwi5_vfm9_qsq9"><intent_id>853608</intent_id><project_id>827016</project_id><text_data>HIRED BY IRON CREEK CONSTRUCTION</text_data><comment_date>2017-08-09T00:00:00</comment_date></row><row _id="row-7uva_b3yn~2as8" _uuid="00000000-0000-0000-D4F3-11F240B7203B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7uva_b3yn~2as8"><intent_id>628959</intent_id><project_id>734125</project_id><text_data>301724</text_data><comment_date>2014-05-09T00:00:00</comment_date></row><row _id="row-be7n.v2j6-xsp3" _uuid="00000000-0000-0000-B86D-1E60449BAEEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-be7n.v2j6-xsp3"><intent_id>686417</intent_id><project_id>758796</project_id><text_data>Higher paid lineperson is the foreman</text_data><comment_date>2015-03-30T00:00:00</comment_date></row><row _id="row-cvzj.mc2t.ukyb" _uuid="00000000-0000-0000-B059-7F6C3CCE4697" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cvzj.mc2t.ukyb"><intent_id>1274913</intent_id><project_id>1035494</project_id><text_data>Centennial's project number - 74510-0048.</text_data><comment_date>2022-10-14T00:00:00</comment_date></row><row _id="row-4zcm_5558-nmvh" _uuid="00000000-0000-0000-F376-C71DB1F61A5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4zcm_5558-nmvh"><intent_id>730047</intent_id><project_id>771021</project_id><text_data>Filed by Carl Pooritnga Jr</text_data><comment_date>2015-11-04T00:00:00</comment_date></row><row _id="row-xwsk~p6gp~3mxp" _uuid="00000000-0000-0000-5784-1759CF8D1362" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xwsk~p6gp~3mxp"><intent_id>841585</intent_id><project_id>810084</project_id><text_data>Filed by Grant Crosswhite.</text_data><comment_date>2017-06-19T00:00:00</comment_date></row><row _id="row-s8h9~nxde_mj26" _uuid="00000000-0000-0000-8ED2-D2D985D64284" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s8h9~nxde_mj26"><intent_id>995547</intent_id><project_id>888648</project_id><text_data>117718-001</text_data><comment_date>2019-07-30T00:00:00</comment_date></row><row _id="row-ybsn_ush6-5986" _uuid="00000000-0000-0000-DB5D-C0F85DB75FF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ybsn_ush6-5986"><intent_id>1029341</intent_id><project_id>889196</project_id><text_data>TRUCK DRIVER- 48&amp;#39; FLATBED HAULING SCRAP METALCRANE OPERATOR-OWNER/OPERATOR -HOLT MORRIS</text_data><comment_date>2020-05-11T00:00:00</comment_date></row><row _id="row-pd2p~hjze_itw8" _uuid="00000000-0000-0000-601E-84E5D853501C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pd2p~hjze_itw8"><intent_id>646542</intent_id><project_id>741310</project_id><text_data>all positions are part-time/no benefits</text_data><comment_date>2014-08-07T00:00:00</comment_date></row><row _id="row-pvem~j5kt-ds6k" _uuid="00000000-0000-0000-85F7-B023F10D7695" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pvem~j5kt-ds6k"><intent_id>641772</intent_id><project_id>739603</project_id><text_data>Not new construction.  Treatment to existing submerged aquatic weeds with &amp;quot;weight lit-line&amp;quot; method, using chemicals required by customer (Douglas County PUD #1).  Customer will provide boat w/ operator for our use.</text_data><comment_date>2014-07-17T00:00:00</comment_date></row><row _id="row-2v48_366c.zjfu" _uuid="00000000-0000-0000-1A21-9C6A3962C963" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2v48_366c.zjfu"><intent_id>1120666</intent_id><project_id>949626</project_id><comment_date>2021-02-05T00:00:00</comment_date></row><row _id="row-4rkc-2mmn-ys62" _uuid="00000000-0000-0000-1213-66F3467714AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4rkc-2mmn-ys62"><intent_id>551518</intent_id><project_id>702860</project_id><text_data>1. Construct 4'x10' utility room attached to single family dwelling unit.  Remove portion of garage, add new drive way and connect home to existing sewer stub.2. The structure is a Single Family Dwelling located on a single legal lot.  3. The home is two stories4. a. no b. no c. yes d. no e. no f. no g. no h. no i. no j. no k. #5 yes #6 yes #7 no #8 no</text_data><comment_date>2013-01-14T00:00:00</comment_date></row><row _id="row-yeiw-fg7s.z6wv" _uuid="00000000-0000-0000-BAC6-4D7666D461E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yeiw-fg7s.z6wv"><intent_id>995646</intent_id><project_id>888689</project_id><text_data>Service repair on heat pump for homeowner in single family 1 story manufactured home, - 4a) NO 4b) NO 4c) YES 4d) NO 4e) NO 4f) NO 4g) NO 4h) NO 4i) NO 4j) NO 4k) NO 5) NO 6) NO 7) NO</text_data><comment_date>2019-07-30T00:00:00</comment_date></row><row _id="row-2xx9~tvys~5rjm" _uuid="00000000-0000-0000-2332-E0CA40E12815" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2xx9~tvys~5rjm"><intent_id>931831</intent_id><project_id>861070</project_id><text_data>This Intent is for tenant improvements on a commercial office space.</text_data><comment_date>2018-09-10T00:00:00</comment_date></row><row _id="row-k7cr_rkue.zmay" _uuid="00000000-0000-0000-851F-41834235E6A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7cr_rkue.zmay"><intent_id>574774</intent_id><project_id>688490</project_id><text_data>Correction made. Removed King County. Work is only in Snohomish County.</text_data><comment_date>2013-06-17T00:00:00</comment_date></row><row _id="row-zjtc.eksm_cmig" _uuid="00000000-0000-0000-46E2-4994A8B6C510" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zjtc.eksm_cmig"><intent_id>465986</intent_id><project_id>670133</project_id><text_data>One owner operator one employee 54.49 hrly</text_data><comment_date>2011-07-29T00:00:00</comment_date></row><row _id="row-pd2g.ch5d_7zkq" _uuid="00000000-0000-0000-0E82-31FB28BA6EAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pd2g.ch5d_7zkq"><intent_id>941217</intent_id><project_id>864626</project_id><text_data>Work performed indoors. Cascade Park Branch Library 600 NE 136th Ave. Vancouver, WA The Crestron control system and tourch panel re-programmed and update program for install of projector.</text_data><comment_date>2018-10-22T00:00:00</comment_date></row><row _id="row-4tg4-acjq.sntu" _uuid="00000000-0000-0000-62B7-F9942666023E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4tg4-acjq.sntu"><intent_id>522550</intent_id><project_id>687518</project_id><text_data>Is the information where you want it now?</text_data><comment_date>2012-07-18T00:00:00</comment_date></row><row _id="row-342d_thgb_cqn6" _uuid="00000000-0000-0000-237F-184E2A7FC786" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-342d_thgb_cqn6"><intent_id>539046</intent_id><project_id>694466</project_id><text_data>$6.35 Pension; $7.14 Medical; $1.69 Food Allowance</text_data><comment_date>2012-12-04T00:00:00</comment_date></row><row _id="row-856e-w8r6-5emc" _uuid="00000000-0000-0000-D0B7-D38F07542E73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-856e-w8r6-5emc"><intent_id>1069520</intent_id><project_id>874900</project_id><comment_date>2020-07-02T00:00:00</comment_date></row><row _id="row-r2x4~axgv-be4b" _uuid="00000000-0000-0000-FAD5-133C87BC85BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r2x4~axgv-be4b"><intent_id>1253197</intent_id><project_id>1024033</project_id><text_data>WO #28657</text_data><comment_date>2022-07-28T00:00:00</comment_date></row><row _id="row-38tz.cynw.sjf5" _uuid="00000000-0000-0000-2F33-51740CF14D0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-38tz.cynw.sjf5"><intent_id>596406</intent_id><project_id>720927</project_id><text_data>We have been using the same Industrial Insurance ID # on many Intents.  Why all of a sudden the change/ notice that this number is wrong.     LNI # 219,337-00  , do you want this?   Please call Jake @ 425.999.5699 to confirm. Thanks.</text_data><comment_date>2013-10-04T00:00:00</comment_date></row><row _id="row-egkv~bekv~jjb3" _uuid="00000000-0000-0000-17AF-4DB8D07D5D7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-egkv~bekv~jjb3"><intent_id>623906</intent_id><project_id>732600</project_id><text_data>Recondition infield grade, topdress using 35 HP Massey Ferguson tractor with blade and 35 HP articulated loader. Hand work using hand rakes and hand shovels.</text_data><comment_date>2014-04-08T00:00:00</comment_date></row><row _id="row-gr9j_s8dp.7chh" _uuid="00000000-0000-0000-1FCF-847E638DD0EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gr9j_s8dp.7chh"><intent_id>1196096</intent_id><project_id>989717</project_id><text_data>9877769</text_data><comment_date>2021-11-30T00:00:00</comment_date></row><row _id="row-wysk.746g~2kmc" _uuid="00000000-0000-0000-E4E8-7DE21A088A2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wysk.746g~2kmc"><intent_id>469393</intent_id><project_id>671387</project_id><text_data>Other trucks = water truck to keep dust down at job sitelaborers= broom and shovels to clean job site</text_data><comment_date>2011-08-17T00:00:00</comment_date></row><row _id="row-34r7_rrrs.9796" _uuid="00000000-0000-0000-4CDF-808E2832D2DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-34r7_rrrs.9796"><intent_id>514487</intent_id><project_id>686852</project_id><text_data>General laborers consist of hand work only.  No power equipment/tools are used by the general laborer. Blade Operatro (motor patrol attachments) - used for subgrading the site work before paving operations. Other trucks consist of the following:  1.  Oil Distributor - used for distribtution of oil if chip sealing is involved.  2.  Pilot car/escort car - used for mobilizing and de-mobilizing heavy equipment to and from the job site.  3.  Water truck (0-8,000 gallon) - used for watering the roadway for compaction before paving/chipping      operations begin and also for dust control, if needed.</text_data><comment_date>2012-05-31T00:00:00</comment_date></row><row _id="row-nrwc.3unt-vh5a" _uuid="00000000-0000-0000-D776-5857ECBCCA42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrwc.3unt-vh5a"><intent_id>949632</intent_id><project_id>862687</project_id><text_data>GENERAL LABOR WORK CONSISTS OF HAND WORK (SHOVEL WORK) NO POWER EQUIPMENT OR POWER TOOLS ARE USED BY THE GENERAL LABORER.</text_data><comment_date>2018-12-07T00:00:00</comment_date></row><row _id="row-7q4j.gcsb-gzq8" _uuid="00000000-0000-0000-AD22-B26B43A7D86D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7q4j.gcsb-gzq8"><intent_id>1105971</intent_id><project_id>934966</project_id><text_data>Septic truck driver.</text_data><comment_date>2020-12-14T00:00:00</comment_date></row><row _id="row-rz79.a36b.6gem" _uuid="00000000-0000-0000-16A1-9AA786917295" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rz79.a36b.6gem"><intent_id>573462</intent_id><project_id>712559</project_id><text_data>Job # 172832</text_data><comment_date>2013-06-05T00:00:00</comment_date></row><row _id="row-3jqp-npeh-x523" _uuid="00000000-0000-0000-CC17-5247D4C90A11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3jqp-npeh-x523"><intent_id>875150</intent_id><project_id>837602</project_id><text_data>Other truck is water truck</text_data><comment_date>2017-11-15T00:00:00</comment_date></row><row _id="row-vbtq~r424-ns85" _uuid="00000000-0000-0000-4A89-4DFE9BAF5DF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vbtq~r424-ns85"><intent_id>726485</intent_id><project_id>764171</project_id><text_data>PCI Job # 15-11228</text_data><comment_date>2015-10-15T00:00:00</comment_date></row><row _id="row-xy9t.qixf_k6ti" _uuid="00000000-0000-0000-508E-4CEE2266DC99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xy9t.qixf_k6ti"><intent_id>837671</intent_id><project_id>823235</project_id><text_data>Work consists of grounds maintenance: lawn mowing, fertilizing, leaf raking, weed pulling, sprinkler repairs. Equipment used will be leaf blowers, string trimmers, walk behind lawn mowers.</text_data><comment_date>2017-06-01T00:00:00</comment_date></row><row _id="row-9mi9~c5mw-anam" _uuid="00000000-0000-0000-8D74-0237DDAE4D53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9mi9~c5mw-anam"><intent_id>1245892</intent_id><project_id>1020249</project_id><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-g95y~zi7p~u352" _uuid="00000000-0000-0000-71B5-D7C0ADE25B00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g95y~zi7p~u352"><intent_id>796502</intent_id><project_id>767958</project_id><text_data>Employee installed rumble strip for 1 day.  He is based out of Nevada, as is our company, and covered by our insurance policy here.  NV ARP 300077</text_data><comment_date>2016-10-18T00:00:00</comment_date></row><row _id="row-b2jh-vdpg.tvir" _uuid="00000000-0000-0000-17B1-926770ADE365" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b2jh-vdpg.tvir"><intent_id>539992</intent_id><project_id>697908</project_id><text_data>3126740</text_data><comment_date>2012-10-16T00:00:00</comment_date></row><row _id="row-u6kj~4sm2.ahp3" _uuid="00000000-0000-0000-8FD0-F6FBF94F6B87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u6kj~4sm2.ahp3"><intent_id>1085997</intent_id><project_id>931726</project_id><text_data>FRINGE BENEFITS PER HOUR INCLUDE: HEALTH, WELFARE, DENTAL- 9.01; WA PENSION - 6.00; NAT'L PENSION - 2.12; INT'L TRAINING - 0.10; IND IMPR - 0.50; JATC - 2.23; SUPP PF -5.00, HOURLY WAGE INCLUDES $4 VACATION</text_data><comment_date>2020-09-04T00:00:00</comment_date></row><row _id="row-29cg~kxyj-mhrs" _uuid="00000000-0000-0000-7CDB-EADBFAAD11CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-29cg~kxyj-mhrs"><intent_id>645749</intent_id><project_id>741006</project_id><text_data>Truck Drivers are 10 to 12 yard end dump trucks, they haul rock and asphalt for paving and road construction.  Truck and pup drivers haul 20 to 24 yards.  They are also end dump and haul rock and asphalt for highway paving and road construction. Other Truck is 0-8,000 gallon water trucks used for asphalt paving to fill finish rollers on the job.  General laborers manually shovel rock and asphalt at the job sites on highway paving and road construction jobs.  They do not operated machinery or vehicles while shoveling rock and or asphalt.</text_data><comment_date>2014-08-05T00:00:00</comment_date></row><row _id="row-brjy.t436_qj5q" _uuid="00000000-0000-0000-8B94-EAC6785A6752" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brjy.t436_qj5q"><intent_id>1029028</intent_id><project_id>901773</project_id><text_data>Supplying and Delivering Material</text_data><comment_date>2019-12-30T00:00:00</comment_date></row><row _id="row-jkxt_zh8u_dccz" _uuid="00000000-0000-0000-FD8D-CD72DAD3EAD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jkxt_zh8u_dccz"><intent_id>612660</intent_id><project_id>727600</project_id><text_data>Tune and Clean Furnace</text_data><comment_date>2014-01-17T00:00:00</comment_date></row><row _id="row-xkzs_gjui~9hwc" _uuid="00000000-0000-0000-7C11-49A05ABB8584" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xkzs_gjui~9hwc"><intent_id>532620</intent_id><project_id>694983</project_id><text_data>All steel placement and handling of steel was paid at the Ironworkers rate. The general laborers were moving Class 5 vault doors for transport from Tacoma to the new vault in Anacortes.</text_data><comment_date>2012-09-12T00:00:00</comment_date></row><row _id="row-apz3_m4it.2q8t" _uuid="00000000-0000-0000-8366-53B517996F6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-apz3_m4it.2q8t"><intent_id>644373</intent_id><project_id>740511</project_id><text_data>The purpose of the data wiring is to support new desktop pc's in the new classroom portables.  The wire is a 4 pair CAT5e computer data wiring.  thank you!</text_data><comment_date>2014-07-31T00:00:00</comment_date></row><row _id="row-ez4g~wgfk-5skc" _uuid="00000000-0000-0000-41D6-E0ED3656B386" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ez4g~wgfk-5skc"><intent_id>1043590</intent_id><project_id>909484</project_id><text_data>80010</text_data><comment_date>2020-03-06T00:00:00</comment_date></row><row _id="row-3785.axr2~q9ct" _uuid="00000000-0000-0000-D31A-C7716695AA92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3785.axr2~q9ct"><intent_id>739064</intent_id><project_id>781464</project_id><text_data>In order for us to consider whether the residential rate is appropriately applied according to the ?residential construction?definition in WAC 296-127-010(9), please answer each of the following questions in the notes section at the bottom of this screen: #1 - Describe the work that your firm was contracted to perform. Insulation. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single family. #3 - Including any basement or garage, how many stories or levels does the structure have? One. #4 - What is the building used for? --Answer ?yes? or ?no? to each of the following options: (a) Any commercial use in the structure? No. (b) Any retail use in the structure? No. (c) Permanent residence only? Yes. (d) Rehabilitation house? No. (e) Transitional housing? No. (f) Communal dining facility? No. (g) Treatment services? No. (h) Dormitories? No. (i) Counseling? No. (j) Is each room and/or bed in the structure rented separately? N/A. (k) Other? N/A. #5 - Does each dwelling unit have its own self-contained kitchen? N/A. #6 - Does each dwelling unit have its own bathroom? N/A. #7 - Is there a community facility or manager�s office on site? N/A. #8 - Is any part of the structure used by members of the public? No.</text_data><comment_date>2015-12-23T00:00:00</comment_date></row><row _id="row-a7ud-kgdx~mwi2" _uuid="00000000-0000-0000-98A6-CF3174049222" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7ud-kgdx~mwi2"><intent_id>521340</intent_id><project_id>688206</project_id><text_data>Fringe:Truck Drivers ($14.64) H&amp;W $7.00, Pension $7.64Truck Drivers ($14.04) H&amp;W $7.00, Pension $7.04</text_data><comment_date>2012-07-10T00:00:00</comment_date></row><row _id="row-exee-sc24-feds" _uuid="00000000-0000-0000-DF7D-C695557DA978" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-exee-sc24-feds"><intent_id>948403</intent_id><project_id>864667</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborers  Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2018-11-30T00:00:00</comment_date></row><row _id="row-mk6m_m2ak~3us8" _uuid="00000000-0000-0000-93AA-601594872FEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mk6m_m2ak~3us8"><intent_id>1172433</intent_id><project_id>976697</project_id><text_data>Service repair on furnace for homeowner in a single family manufactured home - 4a) NO 4b) NO 4c) YES 4d) NO 4e) NO 4f) NO 4g) NO 4h) NO 4i) NO 4j) NO 4k) NO 5) NO 6) NO 7) NO 8) NO</text_data><comment_date>2021-08-25T00:00:00</comment_date></row><row _id="row-rztg_i84s-mszv" _uuid="00000000-0000-0000-3181-28E2EC0E3668" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rztg_i84s-mszv"><intent_id>1160661</intent_id><project_id>970864</project_id><text_data>Mow &amp; haul away grass, trim, weed, , prune shrubs, remove dead vegetation as it occcurs</text_data><comment_date>2021-07-15T00:00:00</comment_date></row><row _id="row-dtap-w75k_bd2s" _uuid="00000000-0000-0000-617D-BE549BBCD7C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dtap-w75k_bd2s"><intent_id>953112</intent_id><project_id>869784</project_id><text_data>No Industrial Insurance Required Per Industrial Insurance Rep. We are an Oregon based company with a WA mailbox for the Secretary of State</text_data><comment_date>2019-01-03T00:00:00</comment_date></row><row _id="row-xcmy.5nr4~dpz8" _uuid="00000000-0000-0000-9816-213C5DDB93DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xcmy.5nr4~dpz8"><intent_id>820491</intent_id><project_id>815492</project_id><text_data>Our contract is for semi yearly service on the Counties truck scales. We check the scales to see if they are within tolerance. We have a test truck with weights and a cart that we move across each section of the scale while another tech is in the scale house making sure the Indicator reads the weight making sure it is the same as the weight being put on each section. If not he uses the keyboard on the Indicator to reprogram the right weight.We also can be called out on emergency calls, which can consist of alot of different things.The scale has shifted, been there because of a fire,Indicator error and bumper plate breaks, etc. Mainly it is just regular service.</text_data><comment_date>2017-03-21T00:00:00</comment_date></row><row _id="row-cwav~rr96_tbhz" _uuid="00000000-0000-0000-2BD8-11C5D4F12466" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cwav~rr96_tbhz"><intent_id>1260583</intent_id><project_id>1027817</project_id><comment_date>2022-08-23T00:00:00</comment_date></row><row _id="row-bjzf~3v65_v6dw" _uuid="00000000-0000-0000-C7CC-8488AB788A81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjzf~3v65_v6dw"><intent_id>666284</intent_id><project_id>749072</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2014-11-18T00:00:00</comment_date></row><row _id="row-yn6h.rz6a.jc8a" _uuid="00000000-0000-0000-B8DB-3F4ECF99BEC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yn6h.rz6a.jc8a"><intent_id>644098</intent_id><project_id>740392</project_id><text_data>#1. Weatherization #2. Single Family Dwelling #3. 2 #4. A.no B.no C.yes D.no E.no F.no G.no H.no I.no j.no K.n/a#5yes #6.yes #7.no #8.no</text_data><comment_date>2014-07-29T00:00:00</comment_date></row><row _id="row-uetz-stw3~srts" _uuid="00000000-0000-0000-B4DD-862DD3CA7BB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uetz-stw3~srts"><intent_id>1464132</intent_id><project_id>1143805</project_id><text_data>W1001266056 - Intent</text_data><comment_date>2024-09-19T00:00:00</comment_date></row><row _id="row-74t5-7xed~4kw8" _uuid="00000000-0000-0000-88F4-8DE666102CFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74t5-7xed~4kw8"><intent_id>1194762</intent_id><project_id>987781</project_id><text_data>#1 - install fire sprinkler system. #2 - apartment buildings</text_data><comment_date>2021-11-22T00:00:00</comment_date></row><row _id="row-pifg.95pq-5zej" _uuid="00000000-0000-0000-FD11-452DC4123AB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pifg.95pq-5zej"><intent_id>1091915</intent_id><project_id>934406</project_id><text_data>tanks loosing water while running and shutting down machine, wash arm o-rings may be leaking so machine pumps tank dry, heater element boxes broken, door guides missing, booster high limit tripped. reset high limit and verified rinse temp at 184/188, replaced wash arm o-rings, tightened conveyor, adjusted upper rinse tank arm lock, ordered heat boxes, lids and door guides. 8/28 wire to on element in rinse tank burned of at element. replaced broken element boxes, lids, and wire, replaced drain orings, probe orings, floats, and door guides.Invoice 34637133</text_data><comment_date>2020-09-29T00:00:00</comment_date></row><row _id="row-hd5v~kscr-ju7k" _uuid="00000000-0000-0000-28A6-41AABD705A9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hd5v~kscr-ju7k"><intent_id>1211075</intent_id><project_id>999278</project_id><text_data>9887858</text_data><comment_date>2022-02-11T00:00:00</comment_date></row><row _id="row-fu7a_3kys.yw57" _uuid="00000000-0000-0000-893E-F7CC239A6C07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fu7a_3kys.yw57"><intent_id>470044</intent_id><project_id>671515</project_id><text_data>This is a purchsing cooperative agreement between Musco and the KCDA.  City of Bellevue has the cooperative agreement with the KCDA.</text_data><comment_date>2011-08-03T00:00:00</comment_date></row><row _id="row-6r9w_hqez.hbgf" _uuid="00000000-0000-0000-5593-1694F412E805" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6r9w_hqez.hbgf"><intent_id>1140389</intent_id><project_id>953780</project_id><text_data>Other trucks listed will be a 2500 gallon water truck used on site for compaction and dust control.</text_data><comment_date>2021-05-04T00:00:00</comment_date></row><row _id="row-hc3i_kmmd~ft9u" _uuid="00000000-0000-0000-67F0-1893F86B6A98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hc3i_kmmd~ft9u"><intent_id>1268624</intent_id><project_id>1025614</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Civil hardscapes#2 - Is the structure a single-family dwelling, duplex, apartment, condominium, or other residential structure? � Low Income Apartment#3 - Including any basement or garage, how many stories or levels does the structure have? 2#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No (b) Any retail use in the structure? No (c) Permanent residence only? Yes(d) Rehabilitation house? No (e) Transitional housing? No(f) Communal dining facility? No (g) Treatment services? No(h) Assisted living services? No (I) Dormitories? No (j) Counseling? No (k) Is each room and/or bed in the structure rented separately? Yes (l) Other? No#5 - Does each dwelling unit have its own self-contained kitchen? Yes #6 - Does each dwelling unit have its own bathroom? Yes#7 - Is there a community facility or manager�s office on site? Yes#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2022-09-22T00:00:00</comment_date></row><row _id="row-2zgc-5nwi~kz2n" _uuid="00000000-0000-0000-83F3-C497B8004B0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2zgc-5nwi~kz2n"><intent_id>1171527</intent_id><project_id>971542</project_id><text_data>Bobcat Skidsteer, and mini excavator and 1 laborer</text_data><comment_date>2021-08-23T00:00:00</comment_date></row><row _id="row-ib57-ctkg-7iiv" _uuid="00000000-0000-0000-E10E-F62E87D1FD35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ib57-ctkg-7iiv"><intent_id>1283817</intent_id><project_id>1041012</project_id><text_data>Arbor Care- Tree Care Plan - AN 423864 WO #137624Proposed Tree Care ServicesTree Quantity: 46Proposal Value: $4,488August 5, 2022Proposal #: 423864Douglas Fir (15)-Building Clearance/ Crown Raise/ Removal Katsuratree (8)-Building Clearance Silver Maple (4)-Crown Raise Japanese Maple (4)-Building Clearance Honey Locust (4)-Crown Raise Incense Cedar (3)-Crown Raise/ crown Reduce Chinese Sweetgum (3)-Crown Raise Afghan Pine (2)-Deadwood Removal Red Alder (1)-Removal Pacific Dogwood (1)-Building Clearance European White Birch (1)-Building Clearance</text_data><comment_date>2022-11-15T00:00:00</comment_date></row><row _id="row-bgm4~w89b~wa4k" _uuid="00000000-0000-0000-0E5B-030A8FF26BB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bgm4~w89b~wa4k"><intent_id>952087</intent_id><project_id>869316</project_id><text_data>Multi Family IntentIn order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2-apartment3-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- yesk- yes6- yes7- no8- no</text_data><comment_date>2018-12-21T00:00:00</comment_date></row><row _id="row-inzr-bu47-mn84" _uuid="00000000-0000-0000-3582-3291E5F03B21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inzr-bu47-mn84"><intent_id>689288</intent_id><project_id>755451</project_id><text_data>The Landscaping is for a city pool remodel project. We will install the irrigation system; and sod. Using hand tools such as shovels, rakes, pipe cutters &amp; etc. Equipment was under the 90 HP � mini excavator to trench &amp; a small skit steer.</text_data><comment_date>2015-04-15T00:00:00</comment_date></row><row _id="row-k4ky_7krt-jcuc" _uuid="00000000-0000-0000-4543-EEE3E3DFB07D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k4ky_7krt-jcuc"><intent_id>1223395</intent_id><project_id>1007113</project_id><text_data>Removal of old damaged flooring and countertops, install of new LVP flooring and counter topsApartmentsTwo storiesNo to all questions A. - L.YesYesYesNo</text_data><comment_date>2022-04-06T00:00:00</comment_date></row><row _id="row-kem3_hsvr_w8rr" _uuid="00000000-0000-0000-68DD-CB097D6E809E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kem3_hsvr_w8rr"><intent_id>931354</intent_id><project_id>856900</project_id><text_data>GU Job #18243Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2018-09-07T00:00:00</comment_date></row><row _id="row-rtit_e9re~fm9g" _uuid="00000000-0000-0000-99C3-518B1927CA10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rtit_e9re~fm9g"><intent_id>541529</intent_id><project_id>690242</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-11-21T00:00:00</comment_date></row><row _id="row-tp8i_fe8p-nm9u" _uuid="00000000-0000-0000-C58D-F9B07B2E2091" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tp8i_fe8p-nm9u"><intent_id>717493</intent_id><project_id>771083</project_id><text_data>152088 - Rocky Reach Forebay Coating</text_data><comment_date>2015-08-28T00:00:00</comment_date></row><row _id="row-9j57~urug_949z" _uuid="00000000-0000-0000-402B-93221787F5E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9j57~urug_949z"><intent_id>540441</intent_id><project_id>694484</project_id><text_data>***This form is being approved on the basis of your statement that your employees will perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***Per CHRR235</text_data><comment_date>2012-11-01T00:00:00</comment_date></row><row _id="row-xxan.93zr-jbm5" _uuid="00000000-0000-0000-2C8A-CE6658539A46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xxan.93zr-jbm5"><intent_id>527880</intent_id><project_id>684338</project_id><text_data>Form filed by: Bob WhitworthProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2012-08-10T00:00:00</comment_date></row><row _id="row-5rbh-kuvw~p3xn" _uuid="00000000-0000-0000-2349-30FCD674487D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5rbh-kuvw~p3xn"><intent_id>513455</intent_id><project_id>688039</project_id><text_data>Landscape Construction wage allowed per Reasa Reasa Pearson, no correction needed</text_data><comment_date>2012-07-31T00:00:00</comment_date></row><row _id="row-q55v~nin8.hwvc" _uuid="00000000-0000-0000-450B-0027C082BA93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q55v~nin8.hwvc"><intent_id>938022</intent_id><project_id>863349</project_id><text_data>The number of people including myself can fluctuate depending on who/how many people we need/and or who is available.</text_data><comment_date>2018-10-05T00:00:00</comment_date></row><row _id="row-gqu3~5txp~998d" _uuid="00000000-0000-0000-DE16-9EB8602B67C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqu3~5txp~998d"><intent_id>448541</intent_id><project_id>663109</project_id><text_data>Industrial Insurance Account Id: 852,991-01</text_data><comment_date>2011-04-05T00:00:00</comment_date></row><row _id="row-fzpu~i5vv_7d36" _uuid="00000000-0000-0000-855F-255946F2A042" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fzpu~i5vv_7d36"><intent_id>675677</intent_id><project_id>754138</project_id><text_data>Specification No. ES14-0379FGeneral Laborer: Hand shovel rock and asphalt ( Laborers Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2015-01-21T00:00:00</comment_date></row><row _id="row-s63x~pdwh.4zpb" _uuid="00000000-0000-0000-9C61-206C29F68DA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s63x~pdwh.4zpb"><intent_id>658721</intent_id><project_id>745962</project_id><text_data>The project consists of running electrical extension cords through-out the location to each lighting fixture. The work also includes replacement of lamps.</text_data><comment_date>2014-10-06T00:00:00</comment_date></row><row _id="row-339a-syt2~wbdb" _uuid="00000000-0000-0000-95D4-6EFBB021B88B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-339a-syt2~wbdb"><intent_id>611211</intent_id><project_id>661000</project_id><text_data>THIS INTENT IS BEING FILED TO REPLACE INTENT ID #464377 WHICH WAS FILED W/INCORRECT HIRING CONTRACTOR INFORMATION. ONCE THIS NEW INTENT IS APPROVED PLEASE DELETE INTENT ID #464377.</text_data><comment_date>2014-01-08T00:00:00</comment_date></row><row _id="row-e9ua-vupq-v674" _uuid="00000000-0000-0000-C643-B4C6D27AE436" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e9ua-vupq-v674"><intent_id>1202474</intent_id><project_id>993778</project_id><text_data>Drying in Place</text_data><comment_date>2022-01-04T00:00:00</comment_date></row><row _id="row-dei7_xy6x~qvi5" _uuid="00000000-0000-0000-DAAC-5926EDB0EE25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dei7_xy6x~qvi5"><intent_id>574798</intent_id><project_id>711657</project_id><text_data>General Laborer: hand shovel &amp; broomOther Trucks: Water truck, Lowboy</text_data><comment_date>2013-06-12T00:00:00</comment_date></row><row _id="row-ezp9_cf3s~evnr" _uuid="00000000-0000-0000-5C5F-FE856789219C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezp9_cf3s~evnr"><intent_id>1000887</intent_id><project_id>848375</project_id><text_data>Providing the beautification of a school using a blower/mulch truck. Using a blower service to place beauty bark in designated areas.</text_data><comment_date>2019-08-20T00:00:00</comment_date></row><row _id="row-77jj-46hc~df9k" _uuid="00000000-0000-0000-16F0-7AED936A410C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-77jj-46hc~df9k"><intent_id>1115868</intent_id><project_id>946944</project_id><text_data>INSTALL NEW LINE AND OLD LINE ONTO A TWO LINE PHONE.</text_data><comment_date>2021-01-18T00:00:00</comment_date></row><row _id="row-yjhd-t6iq~4ym6" _uuid="00000000-0000-0000-E461-CFF19204EE50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yjhd-t6iq~4ym6"><intent_id>1317067</intent_id><project_id>1061800</project_id><text_data>Tools - Shovels, wrenches,Equipment - Mini-X, Welders, Service Truck, CraneLaborers were used to build the pivot, wire and weld mainline</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-yfs5~93wg.zgzw" _uuid="00000000-0000-0000-8733-69DDCE080B32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yfs5~93wg.zgzw"><intent_id>1254077</intent_id><project_id>1024512</project_id><text_data>MMFS Master Contract 22871/Contracts from 8/1/2022 thru 7/31/2025</text_data><comment_date>2022-08-01T00:00:00</comment_date></row><row _id="row-4iyv.72aj-qe98" _uuid="00000000-0000-0000-F22B-9CC3E1A29E98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4iyv.72aj-qe98"><intent_id>940513</intent_id><project_id>864332</project_id><text_data>GU Job #18319Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2018-11-07T00:00:00</comment_date></row><row _id="row-er78-fseq~iwaa" _uuid="00000000-0000-0000-CC5B-7EA00780E6AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-er78-fseq~iwaa"><intent_id>966973</intent_id><project_id>876405</project_id><text_data>**3/22/2019**- Heller- 1)INSTALL NEW GAS FURNACE 2)SINGLE FAMILY 3)1.5 + BSMT 4)a-no b-no c-yes d-no e-no f-no g-no h-no I-no j-no k-none 5)YES 6)YES 7)NO 8)NO</text_data><comment_date>2019-03-22T00:00:00</comment_date></row><row _id="row-st55-et3f~vqtd" _uuid="00000000-0000-0000-3411-295C3814F05D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-st55-et3f~vqtd"><intent_id>1239431</intent_id><project_id>1012444</project_id><text_data>Job #22-30</text_data><comment_date>2022-06-07T00:00:00</comment_date></row><row _id="row-ejkz_8qba_p9fp" _uuid="00000000-0000-0000-2E07-4AFF684640E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ejkz_8qba_p9fp"><intent_id>1087476</intent_id><project_id>921821</project_id><text_data>We were not notified that this was a prevailing wage job until 8/30/20 when we were following-up on overdue invoices for this contractor.</text_data><comment_date>2020-09-15T00:00:00</comment_date></row><row _id="row-ih99~yqdw~a28f" _uuid="00000000-0000-0000-655A-857A8A1237EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ih99~yqdw~a28f"><intent_id>580450</intent_id><project_id>715221</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. - Residential Weatherization#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?          Duplex#3 - Including any basement or garage, how many stories or levels does the structure have?          One#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure? -NO(b) Any retail use in the structure? -NO(c) Permanent residence only? -YES(d) Rehabilitation house? -NO(e) Transitional housing? -NO(f) Communal dining facility? -NO(g) Treatment services? -NO(h) Dormitories? -NO(i) Counseling? -NO(j) Is each room and/or bed in the structure rented separately? �NO(k) Other?#5 - Does each dwelling unit have its own self-contained kitchen? -YES#6 - Does each dwelling unit have its own bathroom? -YES#7 - Is there a community facility or manager�s office on site? -YES#8 - Is any part of the structure used by members of the public?-NO</text_data><comment_date>2013-08-05T00:00:00</comment_date></row><row _id="row-7i9a_hyzt.g7w7" _uuid="00000000-0000-0000-07E8-DC46F7CC18D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7i9a_hyzt.g7w7"><intent_id>589527</intent_id><project_id>712552</project_id><text_data>3500 Mountain Loop highwayGranite Falls, WA 98252</text_data><comment_date>2013-08-23T00:00:00</comment_date></row><row _id="row-qcu9-x3ai-x5h4" _uuid="00000000-0000-0000-367F-E0657C9D9725" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qcu9-x3ai-x5h4"><intent_id>602027</intent_id><project_id>691342</project_id><text_data>General Laborer erected and tore down scaffold. Used truck to deliver scaffold.</text_data><comment_date>2013-11-01T00:00:00</comment_date></row><row _id="row-jkp8.eyhk~tpic" _uuid="00000000-0000-0000-59C9-DCEFAA59E2B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jkp8.eyhk~tpic"><intent_id>763272</intent_id><project_id>792476</project_id><text_data>$22.28 Benefits: $4.56 Local Pension, $3.23 National Pension, $9.01 Health Insurance, $3.75 Supplemental Pension,$.10 Industry Training,$1.63 Joint Apprentice Training Council.</text_data><comment_date>2016-05-19T00:00:00</comment_date></row><row _id="row-wnwh~ctbd.weje" _uuid="00000000-0000-0000-3FE3-09E2A2C447B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wnwh~ctbd.weje"><intent_id>676237</intent_id><project_id>754376</project_id><text_data>1-Attic insulation, Floor insulation, Duct Sealing 2-single family dwelling 3-3 story 4-A-NO B-NO C-YES D-NO E-NO F-NO G-NO H-NO I-NO J-NO K-NO 5-yes 6-yes 7-no 8-no</text_data><comment_date>2015-01-24T00:00:00</comment_date></row><row _id="row-bmx6_af9x-je4k" _uuid="00000000-0000-0000-D52F-D696E0F3F5DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmx6_af9x-je4k"><intent_id>852214</intent_id><project_id>699258</project_id><text_data>Filed by Mike Boyd</text_data><comment_date>2017-08-03T00:00:00</comment_date></row><row _id="row-jztm.5i7f-9mhn" _uuid="00000000-0000-0000-F864-6477868CBC54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jztm.5i7f-9mhn"><intent_id>1082312</intent_id><project_id>930010</project_id><text_data>Recovered remaining refrigerant.  Un sadder ed compressor, and liquid line filter drier. Saddered in new compressor and liquid line filter draw.  Pressure tested refrigeration system with nitrogen.  repaired any remaining leaks.  Evacuated system to manufacturer specs.  Replaced compressor wiring harness and compressor cont-actor.  Recharged unit with factory amount of refrigerant.  Cycled unit from the thermostat.</text_data><comment_date>2020-08-26T00:00:00</comment_date></row><row _id="row-3gdj-hjep_7u22" _uuid="00000000-0000-0000-E28B-FB235CEF6F1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gdj-hjep_7u22"><intent_id>1231809</intent_id><project_id>1012121</project_id><text_data>SRO 1914638 1914639 1914640</text_data><comment_date>2022-05-09T00:00:00</comment_date></row><row _id="row-c8wv~dvh4~a6uv" _uuid="00000000-0000-0000-A193-6F53D6708B63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c8wv~dvh4~a6uv"><intent_id>605487</intent_id><project_id>707453</project_id><text_data>Filed by Byron Lott.</text_data><comment_date>2013-11-20T00:00:00</comment_date></row><row _id="row-q9ud.azia~ngv3" _uuid="00000000-0000-0000-5C43-77581F74907E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9ud.azia~ngv3"><intent_id>993333</intent_id><project_id>887765</project_id><text_data>510714</text_data><comment_date>2019-07-19T00:00:00</comment_date></row><row _id="row-th5i-32kw-ptgx" _uuid="00000000-0000-0000-9DC2-83343CC83114" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-th5i-32kw-ptgx"><intent_id>1163355</intent_id><project_id>972216</project_id><text_data>Woodland Park Ave N., Seattle, WA 981031. Air seal, attic blow, wall blow, crawl and mechanical ventilation    2. Single family      3. 1      4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No     5. Yes      6. Yes      7. No      8. No</text_data><comment_date>2021-07-26T00:00:00</comment_date></row><row _id="row-e6ap-engk-sti7" _uuid="00000000-0000-0000-CD41-C14D6DC9EE72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e6ap-engk-sti7"><intent_id>996163</intent_id><project_id>888892</project_id><text_data>7021137</text_data><comment_date>2019-07-31T00:00:00</comment_date></row><row _id="row-2yzv~9xkx.mqcs" _uuid="00000000-0000-0000-7EDC-615B866E54B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2yzv~9xkx.mqcs"><intent_id>1112617</intent_id><project_id>935244</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install distribution cable for voice / data communications. Install copper cables for communications backbone between equipment rooms. Terminate cables in the equipment room and terminate the cables routed between Comm. equipment rooms.</text_data><comment_date>2020-12-31T00:00:00</comment_date></row><row _id="row-iwv8~nt39.kwf3" _uuid="00000000-0000-0000-40B7-05CE5F87B9CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iwv8~nt39.kwf3"><intent_id>476828</intent_id><project_id>672657</project_id><text_data>WAGE &amp; FRINGE BENEFITS IN ACCORDANCE WITH UNION PACKAGES AT TIME OF BID.</text_data><comment_date>2011-09-08T00:00:00</comment_date></row><row _id="row-hfdy.6cpy~rk66" _uuid="00000000-0000-0000-3F33-1EB17479A36D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hfdy.6cpy~rk66"><intent_id>523675</intent_id><project_id>692079</project_id><text_data>In Reply to your inquiry about the scope of work:We are removing 6� of top soil and sod from around personal houses and replacing landscape boarders, top soil, sod, planters and flowers and shrubs.  We will also be removing rockeries with planters around the same personal residences.We will be replacing landscape rock around the houses and bark dust around the houses.  We will also be placing topsoil and sod at a park where there has been some excavation work previously by another contractor under another contract.</text_data><comment_date>2012-07-24T00:00:00</comment_date></row><row _id="row-rrfy~rmdi_avte" _uuid="00000000-0000-0000-A39D-03B30DD27A61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rrfy~rmdi_avte"><intent_id>1263976</intent_id><project_id>1029585</project_id><text_data>12741 SA 2022	9898851</text_data><comment_date>2022-09-04T00:00:00</comment_date></row><row _id="row-2zbf.3sjm.fd4a" _uuid="00000000-0000-0000-7A82-41F424799A26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2zbf.3sjm.fd4a"><intent_id>529388</intent_id><project_id>689324</project_id><text_data>Filed By Carl Poortinga Jr</text_data><comment_date>2012-08-20T00:00:00</comment_date></row><row _id="row-5bp6_dvzx-sj8h" _uuid="00000000-0000-0000-CA5F-4F452C3B3D1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bp6_dvzx-sj8h"><intent_id>934116</intent_id><project_id>861924</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2018-09-26T00:00:00</comment_date></row><row _id="row-h4fh.ap43_t4gk" _uuid="00000000-0000-0000-CE9D-329391A09D59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h4fh.ap43_t4gk"><intent_id>1088234</intent_id><project_id>932718</project_id><text_data>9856100</text_data><comment_date>2020-09-15T00:00:00</comment_date></row><row _id="row-v7vh.maf9-2pc3" _uuid="00000000-0000-0000-ED61-C245582551CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v7vh.maf9-2pc3"><intent_id>1097440</intent_id><project_id>908330</project_id><text_data>Kitchen Cabinets, Dinning room Cabinets, Restroom Storage Cabinets and Pantry Shelving</text_data><comment_date>2020-10-21T00:00:00</comment_date></row><row _id="row-r7g2-gj5w~9i3w" _uuid="00000000-0000-0000-D790-C2D9B6336CFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r7g2-gj5w~9i3w"><intent_id>802458</intent_id><project_id>807710</project_id><text_data>In each of 2 portables: (1) Voice for phone (10) Data CAT5E For Computers; inside</text_data><comment_date>2016-11-18T00:00:00</comment_date></row><row _id="row-av8x_brhn-dw3j" _uuid="00000000-0000-0000-0B9B-62EA256C0A2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-av8x_brhn-dw3j"><intent_id>1152378</intent_id><project_id>965079</project_id><text_data>We need to change the amount of affidavit for intent #1152378 from $8,930.08 to $9,077.27. Requested by Olga Murphy.</text_data><comment_date>2021-08-19T00:00:00</comment_date></row><row _id="row-u6bk.pwus.ninv" _uuid="00000000-0000-0000-A54B-6AA74568E747" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u6bk.pwus.ninv"><intent_id>585441</intent_id><project_id>716983</project_id><text_data>The laborer will carry equipment and material.  He is a spotter where this is work on a roof.  He will not do any painting or spraying of paint.</text_data><comment_date>2013-08-19T00:00:00</comment_date></row><row _id="row-8axa_ey8x~92t9" _uuid="00000000-0000-0000-CF18-CB862B9180F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8axa_ey8x~92t9"><intent_id>990843</intent_id><project_id>883902</project_id><text_data>We are working two of the three jobsTukwila Elementary - 5939 149th St, Tukwila, WA 98168Cascade View Elementary 13601 32nd Avenue South Tukwila 98168</text_data><comment_date>2019-07-10T00:00:00</comment_date></row><row _id="row-dqad~esh5.v2bm" _uuid="00000000-0000-0000-164E-76B8B4C0D96F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dqad~esh5.v2bm"><intent_id>1318702</intent_id><project_id>1051824</project_id><text_data>General Cleaning</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-5x8u~vi2x_2wzb" _uuid="00000000-0000-0000-B617-C506E07D90C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5x8u~vi2x_2wzb"><intent_id>1016080</intent_id><project_id>896467</project_id><text_data>FILED BY DOUGLAS DORLING</text_data><comment_date>2019-10-17T00:00:00</comment_date></row><row _id="row-fytw~kssn~39xy" _uuid="00000000-0000-0000-D6EF-35317F7B7912" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fytw~kssn~39xy"><intent_id>629911</intent_id><project_id>735086</project_id><text_data>Form filed by: Walter Lee</text_data><comment_date>2014-05-15T00:00:00</comment_date></row><row _id="row-tdrq_qnur~4dqq" _uuid="00000000-0000-0000-3DE1-AAD0B8E9FA2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tdrq_qnur~4dqq"><intent_id>486147</intent_id><project_id>666472</project_id><text_data>No Material will be used from Striperite.  Oceanside will provide material -- intent is for labor only.</text_data><comment_date>2011-10-27T00:00:00</comment_date></row><row _id="row-fe53_63ya.2y4p" _uuid="00000000-0000-0000-0256-86F60A25FDCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fe53_63ya.2y4p"><intent_id>796291</intent_id><project_id>788139</project_id><text_data>Changes made as L&amp;I stated</text_data><comment_date>2016-10-25T00:00:00</comment_date></row><row _id="row-gamb~w4ut_cnnz" _uuid="00000000-0000-0000-FE17-4837C8E1E5AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gamb~w4ut_cnnz"><intent_id>536962</intent_id><project_id>685604</project_id><text_data>Row 1: Federal wage (31.68) + Federal Fringe (16.23-5.78 usual benefits = 10.45). 42.13/hr. T&amp;T (over 16 yds). 42.13+5.7 8= 47.91/hr totalRow 2: Federal wage (30.84) + Federal Fringe (16.23-5.78 usual benefits = 10.45). 41.29/hr. Solo (to 16 yds). 41.29+5.78 = 47.07/hr totalRow 3: Row 2 *1.5. 41.29 times 1.5 for OT rates of 61.94Row 4: Row 1 *1.5. 42.13 times 1.5 for OT rate of 63.20</text_data><comment_date>2012-09-27T00:00:00</comment_date></row><row _id="row-j7at-xnpu.eg6s" _uuid="00000000-0000-0000-EED4-2D023A635018" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j7at-xnpu.eg6s"><intent_id>981404</intent_id><project_id>757281</project_id><text_data>Labor for installation of low-voltage telecommunications cabling inside apartment buildings for the purpose of networking personal computers.</text_data><comment_date>2019-05-30T00:00:00</comment_date></row><row _id="row-sa9t-6w6n_yxp8" _uuid="00000000-0000-0000-4304-887503368FA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sa9t-6w6n_yxp8"><intent_id>1050565</intent_id><project_id>917086</project_id><text_data>PLEASE INSTALL ELECTRICAL OUTLET AND WADS DATA JACK BETWEEN LL197 AND LL198 � SEE ATTACHED FLOOR PLAN � FROM TEAM MONITOR AND COMPUTER.</text_data><comment_date>2020-04-09T00:00:00</comment_date></row><row _id="row-t3wn_9cgx.z9sv" _uuid="00000000-0000-0000-D02A-723E70A3870C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3wn_9cgx.z9sv"><intent_id>704936</intent_id><project_id>766471</project_id><text_data>055049</text_data><comment_date>2015-07-02T00:00:00</comment_date></row><row _id="row-8brs.yn5d-bfvx" _uuid="00000000-0000-0000-E33D-93117EF8A10C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8brs.yn5d-bfvx"><intent_id>490257</intent_id><project_id>678634</project_id><text_data>Exempt � Our employee performed the removal of an old compressor and then uncrating and placement of new compressor; outside prevailing wages. Addendum C � Additional Information � Answers to Exempt Questions:1.)	Purpose was supply and installation of a new Breathing Air Compressor, Containment Fill station and Air Storage System for Eastside Fire and Rescue.2.)	No3.)	Our Employeea.	Removal of existing compressor at fire station removal was done by pallet jack. Old unit was move to storage area at same site.b.	Uncrating of new compressor (done with crowbar)c.	Placement of new compressor (done with pallet jack)4.)	Tools used: Crow bar, Pallet Jack5.)	N/A</text_data><comment_date>2011-11-21T00:00:00</comment_date></row><row _id="row-672a.76tm_psj8" _uuid="00000000-0000-0000-1405-19BC95BF0E83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-672a.76tm_psj8"><intent_id>619167</intent_id><project_id>663725</project_id><text_data>Hourly Fringes: Health Security $6.02, Pension $8.95, Apprenticeship .$63, Annuity $4.00, **Vacation -$1.50, Impact $0.25, ** Work Assessment checkoff -$.75 (journeyman), ** work Assessment check-off -$.65 apprentices. Total hourly Fringes 19.85**deducted from net wages</text_data><comment_date>2014-03-11T00:00:00</comment_date></row><row _id="row-xkmb_nss3-vjra" _uuid="00000000-0000-0000-DB4F-593518C042C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xkmb_nss3-vjra"><intent_id>703199</intent_id><project_id>765826</project_id><text_data>Visually identify and record on an excel spreadsheet the network switch port assignmenss paired with network workstation cable inside telecom rooms.</text_data><comment_date>2015-06-24T00:00:00</comment_date></row><row _id="row-v2un~f28f_fgp9" _uuid="00000000-0000-0000-0C85-A464A1CECEE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v2un~f28f_fgp9"><intent_id>697161</intent_id><project_id>763404</project_id><text_data>OTHER TRUCKS = OIL DISTRIBUTOR FOR THE DISTIBUTION OF BINDING AGENT PRIOR TO PAVING.</text_data><comment_date>2015-05-28T00:00:00</comment_date></row><row _id="row-2g56~n2qr~ivjk" _uuid="00000000-0000-0000-217E-A5E02A029AD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2g56~n2qr~ivjk"><intent_id>1220122</intent_id><project_id>986048</project_id><text_data>Supply and Deliver Playground Surfacing</text_data><comment_date>2022-04-14T00:00:00</comment_date></row><row _id="row-q8gn-rdie-497h" _uuid="00000000-0000-0000-B942-1084C2EAE18C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8gn-rdie-497h"><intent_id>646631</intent_id><project_id>741357</project_id><text_data>Several manufactured homes within the City of Olympia		#1 - Install Floor Insulation #2 - Single family manufactured home #3 - 1 level #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2014-08-08T00:00:00</comment_date></row><row _id="row-3g7r.35kv-nmg8" _uuid="00000000-0000-0000-8BFB-ABC8FF84E04B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3g7r.35kv-nmg8"><intent_id>1243177</intent_id><project_id>1016311</project_id><text_data>Fringe Benefits - Apprentice Level 3 through Journeyman $31.64/hr:Annuity/Pension $18.95Health $9.20PTO: $2.40Apprenticeship $.77Impact/Industry $.32Fringe Benefits - Apprentice Level 1 &amp; 2 $12.69/hr:Health $9.20PTO: $2.40Apprenticeship $.77Impact/Industry $.32</text_data><comment_date>2022-06-22T00:00:00</comment_date></row><row _id="row-c8qn_bvbs.cb79" _uuid="00000000-0000-0000-0F6D-560DB03DF80D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c8qn_bvbs.cb79"><intent_id>567149</intent_id><project_id>703252</project_id><text_data>Painters to apply Spraywall to inside of 48&amp;quot; Manholes</text_data><comment_date>2013-04-30T00:00:00</comment_date></row><row _id="row-k898.mvqh-b2hf" _uuid="00000000-0000-0000-7717-B9A2629A89C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k898.mvqh-b2hf"><intent_id>607512</intent_id><project_id>710919</project_id><text_data>Electricians � Inside:Health: $7.45Pension: $9.66Training: $0.58Total: $17.69 Electricians � Inside:Health: $7.45Pension: $9.91Training: $0.58Total: $17.94</text_data><comment_date>2013-12-06T00:00:00</comment_date></row><row _id="row-iv3c_qurr.idk8" _uuid="00000000-0000-0000-88C2-980FF3FAB32C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iv3c_qurr.idk8"><intent_id>930093</intent_id><project_id>856227</project_id><text_data>Michels portion of the project is to install a cured in place liner into existing sewer lines without digging them up.  No excavation.  Michels to perform all work through existing manholes</text_data><comment_date>2018-08-31T00:00:00</comment_date></row><row _id="row-bfqp-h4zz-a9ex" _uuid="00000000-0000-0000-E8F2-3DC3F4A47ED6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bfqp-h4zz-a9ex"><intent_id>1419572</intent_id><project_id>1120381</project_id><text_data>Work to be performed by employees - clean area with water and scrub brush</text_data><comment_date>2024-04-16T00:00:00</comment_date></row><row _id="row-ju3z_mev8~xhxi" _uuid="00000000-0000-0000-6854-6B297A11F36D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ju3z_mev8~xhxi"><intent_id>907108</intent_id><project_id>851762</project_id><text_data>In order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2-apartment3-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- yesk- yes6- yes7- no8- noChantelle Apartments - 2828 NE 3rd St 98056</text_data><comment_date>2018-05-25T00:00:00</comment_date></row><row _id="row-qwip_2cu7~p22v" _uuid="00000000-0000-0000-A894-FBE7A115EB78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qwip_2cu7~p22v"><intent_id>696326</intent_id><project_id>759037</project_id><text_data>065015</text_data><comment_date>2015-05-26T00:00:00</comment_date></row><row _id="row-p7yq_2hg2~fxu8" _uuid="00000000-0000-0000-6EA7-A85DAED7518E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7yq_2hg2~fxu8"><intent_id>693329</intent_id><project_id>761758</project_id><text_data>The work consists of mowing grass &amp; brush on a on-call basis.  Equipment to be used consists of ride on and walk behind mowers, weed eaters, small chain saws for pruning.  Any equipment used on site will have LESS than 90 horse power.  There will not be any digging, trenching, dozing or earth moving of any type.We will be the only contractor involved.</text_data><comment_date>2015-05-07T00:00:00</comment_date></row><row _id="row-uzez-wzp3-6mxe" _uuid="00000000-0000-0000-39C7-11895D459D17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzez-wzp3-6mxe"><intent_id>930867</intent_id><project_id>836374</project_id><text_data>Job# 17-082</text_data><comment_date>2018-09-06T00:00:00</comment_date></row><row _id="row-q886~wzw4_3t5u" _uuid="00000000-0000-0000-BF28-76AD7DEE3FC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q886~wzw4_3t5u"><intent_id>493334</intent_id><project_id>661718</project_id><text_data>Form filed by: Sherri Corcoran</text_data><comment_date>2012-02-13T00:00:00</comment_date></row><row _id="row-e6f8.v645~zzsz" _uuid="00000000-0000-0000-7973-9E94E150736A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e6f8.v645~zzsz"><intent_id>771153</intent_id><project_id>795141</project_id><text_data>1 drain cleaning 2 single 3 n/a 4 a no b no c yes d no e no f no g no h no i no j no 5 yes 6 yes 7 no 8 no</text_data><comment_date>2016-06-27T00:00:00</comment_date></row><row _id="row-cnyi~528f~qn7u" _uuid="00000000-0000-0000-81F0-A648DB1356FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cnyi~528f~qn7u"><intent_id>1020695</intent_id><project_id>899048</project_id><text_data>Fringe Benefits Per Hour include:  Health,Welfare,Dental - $9.01; WA Pension - $2.50; Nat;l Pension - $.76; Int'l Training - $.10; Industry Improvement - $.50; JATC - $1.90; Supplemental Pension - $2.94.  Hourly Wage includes $2.00 Vacation.</text_data><comment_date>2019-11-08T00:00:00</comment_date></row><row _id="row-e4jg.8x2j_3wk6" _uuid="00000000-0000-0000-8CF4-83AA9F73CEBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e4jg.8x2j_3wk6"><intent_id>754554</intent_id><project_id>788678</project_id><text_data>Filed by Gary Kazda</text_data><comment_date>2016-04-01T00:00:00</comment_date></row><row _id="row-xevn-uiwx_kbmv" _uuid="00000000-0000-0000-7972-2EDF820811C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xevn-uiwx_kbmv"><intent_id>1079712</intent_id><project_id>928831</project_id><text_data>SEE PROJECT DESCRIPTION</text_data><comment_date>2020-08-12T00:00:00</comment_date></row><row _id="row-ng86-7icx.pzyz" _uuid="00000000-0000-0000-9C55-EBEE9EB5CFD3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ng86-7icx.pzyz"><intent_id>944018</intent_id><project_id>839969</project_id><text_data>&amp;quot;Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.&amp;quot;</text_data><comment_date>2018-11-05T00:00:00</comment_date></row><row _id="row-5tpu-y5fm_4xkg" _uuid="00000000-0000-0000-59B8-C4CC682CEB5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5tpu-y5fm_4xkg"><intent_id>1132897</intent_id><project_id>956554</project_id><text_data>9860740</text_data><comment_date>2021-03-31T00:00:00</comment_date></row><row _id="row-2tua-aqdc-h7tf" _uuid="00000000-0000-0000-4F3D-C43C8F304A97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tua-aqdc-h7tf"><intent_id>1022276</intent_id><project_id>899777</project_id><text_data>#1 - Decommission an oil furnace and install electric heat pump. #2 -Single family dwelling #3 - two stories  #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no (b) Any retail use in the structure? no (c) Permanent residence only? yes (d) Rehabilitation house? no (e) Transitional housing? no (f) Communal dining facility? no (g) Treatment services? no (h) Assisted living services? no (I) Dormitories? no  (j) Counseling? no (k) Is each room and/or bed in the structure rented separately? no (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? no  #6 - Does each dwelling unit have its own bathroom? no #7 - Is there a community facility or manager�s office on site? no #8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2019-11-18T00:00:00</comment_date></row><row _id="row-j74e_e398~fxd3" _uuid="00000000-0000-0000-24E4-C47F16AB6BC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j74e_e398~fxd3"><intent_id>1261265</intent_id><project_id>1022657</project_id><text_data>VE # 30001</text_data><comment_date>2022-08-25T00:00:00</comment_date></row><row _id="row-tmj9.3fra.zyew" _uuid="00000000-0000-0000-2154-4CE8BC8776A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tmj9.3fra.zyew"><intent_id>760554</intent_id><project_id>788553</project_id><text_data>046071</text_data><comment_date>2016-05-06T00:00:00</comment_date></row><row _id="row-eca2.4xyk-8is5" _uuid="00000000-0000-0000-A69B-04163D4A3C45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eca2.4xyk-8is5"><intent_id>678433</intent_id><project_id>755360</project_id><text_data>Installation of a new well pump, chlorination system, control building, 500 feet of water line, and misc site improvements.</text_data><comment_date>2015-02-09T00:00:00</comment_date></row><row _id="row-36ub.f64i-cc4b" _uuid="00000000-0000-0000-27B9-699B9274F8AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-36ub.f64i-cc4b"><intent_id>593526</intent_id><project_id>718272</project_id><text_data>Filed by: Michael HummelState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- North Base HVAC Replacement and Electrical UpgradesPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you Claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.)	What is the purpose of this awarding agency�s public works project?Update building HVAC systems and HVAC controls.2.)	Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.)	Does this project entail the remodeling or new construction of a facility?Yes, but not performed by Siemens Employees.4.)	If your firm is working upon a type of building system, what type of system is involved? HVAC control system.5.)	What specific tasks did your employees perform?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.  6.)	What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.)	If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.)	Are you going to be hiring any subcontractors for this project?Yes. To expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2013-09-13T00:00:00</comment_date></row><row _id="row-mryq~p5k9-axpn" _uuid="00000000-0000-0000-CA85-30D64508AD89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mryq~p5k9-axpn"><intent_id>738042</intent_id><project_id>762164</project_id><text_data>HIRED BY J E M CONTRACTORS</text_data><comment_date>2015-12-16T00:00:00</comment_date></row><row _id="row-6x9n.8x2g_f7ks" _uuid="00000000-0000-0000-ABEA-3FE3E5895431" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6x9n.8x2g_f7ks"><intent_id>1014375</intent_id><project_id>895762</project_id><text_data>Other truck is a 1992 Peterbilt water truck, chassis mounted 3,500 gal water tank, used for watering base course and top course for compaction of roadway prior to asphalt paving.</text_data><comment_date>2019-10-09T00:00:00</comment_date></row><row _id="row-278z.jn3n.mdrp" _uuid="00000000-0000-0000-67DD-1FAB615FF931" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-278z.jn3n.mdrp"><intent_id>904909</intent_id><project_id>844368</project_id><text_data>Oregon Employees Only - SAIF 811528</text_data><comment_date>2018-05-15T00:00:00</comment_date></row><row _id="row-gj8h-i7gk.gvdp" _uuid="00000000-0000-0000-F64D-7EB67F33F5F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gj8h-i7gk.gvdp"><intent_id>1250610</intent_id><project_id>870216</project_id><text_data>PCI Scaffolding 404 (22-03965)</text_data><comment_date>2022-07-20T00:00:00</comment_date></row><row _id="row-pu2i.7ux3.b7kj" _uuid="00000000-0000-0000-5998-C6E31C6602EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pu2i.7ux3.b7kj"><intent_id>712301</intent_id><project_id>767594</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2015-08-06T00:00:00</comment_date></row><row _id="row-evjr.u7sy~xwy3" _uuid="00000000-0000-0000-3CB4-1F56D80CF301" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-evjr.u7sy~xwy3"><intent_id>1174100</intent_id><project_id>977575</project_id><text_data>Company name: Dundee Concrete and LandscapingReg#: dundecl885dlUBI: 602 589 496</text_data><comment_date>2021-09-08T00:00:00</comment_date></row><row _id="row-74uy.ii2d.rce5" _uuid="00000000-0000-0000-61CD-456181E1D8E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74uy.ii2d.rce5"><intent_id>1109096</intent_id><project_id>943100</project_id><text_data>Rodent Infestation</text_data><comment_date>2020-12-10T00:00:00</comment_date></row><row _id="row-vf8t_ri3g~6wj2" _uuid="00000000-0000-0000-517D-6E97B41CCBA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vf8t_ri3g~6wj2"><intent_id>1187161</intent_id><project_id>925750</project_id><text_data>The subcontractor's duties for this project were to bring playground material in their truck to the facility where everything was marked and ready for their guy (landscape construction) to take a hose and blow the product on the playground where they were told to.</text_data><comment_date>2021-10-21T00:00:00</comment_date></row><row _id="row-q8jf~dtbm~mw39" _uuid="00000000-0000-0000-94F2-9ECDB563C1DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8jf~dtbm~mw39"><intent_id>1080004</intent_id><project_id>926539</project_id><text_data>We will be connecting a complete irrigation system which includes valves, pump station, wiring, and heads.  Landscaping will include adding soil amendments, concrete mow curb, trees and shrubs, landscape fabric, and turf grass.  We will be using hand tools such as rakes, shovels, pipe cutters and wheel barrels.  We will use small equipment under 90 hp like skit steer, and mini loader.</text_data><comment_date>2020-08-13T00:00:00</comment_date></row><row _id="row-i2w4.9ik7-8fb4" _uuid="00000000-0000-0000-7FE5-4E75D2DEB7C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2w4.9ik7-8fb4"><intent_id>955320</intent_id><project_id>870851</project_id><text_data>1. Cut out mold damaged drywall, hepa vac, clean up.  2.  Single Family Dwelling.  3.  2 Story.  4.  a. yes b.  no  c. yes park ranger housing  d. no  e.no  f. no  g. no h. no  i.no  j.no  k.no l.no  5.  Yes  6. Yes  7.  Yes  8. no</text_data><comment_date>2019-01-15T00:00:00</comment_date></row><row _id="row-fkxu.m8c7.5xdu" _uuid="00000000-0000-0000-218C-38BBCA25ECCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fkxu.m8c7.5xdu"><intent_id>1182442</intent_id><project_id>963690</project_id><text_data>Energy upgrades at hospital.  Our portion of the landscaping is for operator to dig and backfill places where a new propane tank will be installed by others and then the landscaping construction activity will be compacting the native soil at new propane tank and installing washed rock in the new tank area.</text_data><comment_date>2021-10-01T00:00:00</comment_date></row><row _id="row-nqqw~vjsm~6788" _uuid="00000000-0000-0000-A13E-4C8476145E21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nqqw~vjsm~6788"><intent_id>568562</intent_id><project_id>710562</project_id><text_data>Other Trucks: Lowboy &amp; Water truckGeneral Laborer: Using hand shovel and brooms.</text_data><comment_date>2013-05-08T00:00:00</comment_date></row><row _id="row-4tyr~wxxf-wwmi" _uuid="00000000-0000-0000-DFDF-19BDC75E2A49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4tyr~wxxf-wwmi"><intent_id>656024</intent_id><project_id>744943</project_id><text_data>Job # 209229</text_data><comment_date>2014-09-22T00:00:00</comment_date></row><row _id="row-iuct_26sy_f8ki" _uuid="00000000-0000-0000-A0E1-08F1AB858790" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iuct_26sy_f8ki"><intent_id>514226</intent_id><project_id>687562</project_id><text_data>072032</text_data><comment_date>2012-05-30T00:00:00</comment_date></row><row _id="row-g6fs_xpey.ikm9" _uuid="00000000-0000-0000-ED4C-596EE682AB61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g6fs_xpey.ikm9"><intent_id>573327</intent_id><project_id>709369</project_id><text_data>1. Paint Doors and Door Frames 2. Apartments 3. Three Stories 4. A no B no C yes D no E no F no G no H no 5. yes6. yes 7. yes 8. no</text_data><comment_date>2013-06-18T00:00:00</comment_date></row><row _id="row-ybdh~iabw_sq4h" _uuid="00000000-0000-0000-0E86-471F6068B5E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ybdh~iabw_sq4h"><intent_id>607234</intent_id><project_id>710745</project_id><text_data>24 units residential senior housing in one three story bldg. no basement or garage.self contained kitchenhas own bathroom and facility is not for public use</text_data><comment_date>2013-12-05T00:00:00</comment_date></row><row _id="row-3i7v.8ekz.83wz" _uuid="00000000-0000-0000-1E4F-063EF2F93EAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3i7v.8ekz.83wz"><intent_id>1048438</intent_id><project_id>888245</project_id><text_data>Aluminum StorefrontsApartments?</text_data><comment_date>2020-03-30T00:00:00</comment_date></row><row _id="row-gw5i-a4gq.4c9n" _uuid="00000000-0000-0000-1459-AFDFD6E9F7D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gw5i-a4gq.4c9n"><intent_id>988867</intent_id><project_id>878757</project_id><text_data>3001125</text_data><comment_date>2019-07-01T00:00:00</comment_date></row><row _id="row-626z~7tez.g8hq" _uuid="00000000-0000-0000-618F-C21B56140CC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-626z~7tez.g8hq"><intent_id>820674</intent_id><project_id>804643</project_id><text_data>Installation of irrigation and plants per plans and specifications provided by architect and Port of Everett. Materials to be delivered by others. Irrigation mainline @ 18&amp;quot;. laterals @ 12&amp;quot;, topsoil depth 6&amp;quot; Mulch @ 3&amp;quot;. Trenches and planting holes hand dug. Wheelbarrows, Shovels, rakes.</text_data><comment_date>2017-03-14T00:00:00</comment_date></row><row _id="row-hum4~wqic_hy77" _uuid="00000000-0000-0000-5CCB-CA1CACB5ECCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hum4~wqic_hy77"><intent_id>621400</intent_id><project_id>731477</project_id><text_data>Landscapers will be removing the sticker bushes and other vegetation from the area where the windows will be installed.</text_data><comment_date>2014-03-21T00:00:00</comment_date></row><row _id="row-x4ra_bfz7-4ndt" _uuid="00000000-0000-0000-305B-A8B70FCAA1DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x4ra_bfz7-4ndt"><intent_id>953339</intent_id><project_id>869904</project_id><text_data>Filed by Klodian Sokoli</text_data><comment_date>2019-01-04T00:00:00</comment_date></row><row _id="row-9bdu.qe7p-7jw9" _uuid="00000000-0000-0000-E176-E642C744972B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9bdu.qe7p-7jw9"><intent_id>598175</intent_id><project_id>719901</project_id><text_data>Filed by Neil Provenzano.</text_data><comment_date>2013-10-08T00:00:00</comment_date></row><row _id="row-36bj_tndu-29ug" _uuid="00000000-0000-0000-3D78-ED65820814A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-36bj_tndu-29ug"><intent_id>793350</intent_id><project_id>764569</project_id><text_data>LEI#616016</text_data><comment_date>2016-10-03T00:00:00</comment_date></row><row _id="row-quu5~y3sz_ucgt" _uuid="00000000-0000-0000-E73E-06C9E38993F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-quu5~y3sz_ucgt"><intent_id>525757</intent_id><project_id>692834</project_id><text_data>Form filed by: Erica Merrill - petu235</text_data><comment_date>2012-08-01T00:00:00</comment_date></row><row _id="row-kar3.fdr4-ksu5" _uuid="00000000-0000-0000-BB51-54AD2541B40F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kar3.fdr4-ksu5"><intent_id>819870</intent_id><project_id>812394</project_id><text_data>PN # 31498</text_data><comment_date>2017-03-09T00:00:00</comment_date></row><row _id="row-krut-kz9p.hi44" _uuid="00000000-0000-0000-43F9-F617E0CDE256" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-krut-kz9p.hi44"><intent_id>688409</intent_id><project_id>759347</project_id><text_data>General Laborer consists of the following:1) Hand work (no power tools or equipment) $28.33 p/hour + $7.19 fringe (fringe goes to pension)Blade operator is used for grading the project site for compaction before paving or chip sealing operationsOther trucks consists of the following:1) 0 to 8,000 gallon water truck used to help with compaction during the grading process and dust control $22.87 p/hour + $5.72 fringe (fringe is all paid to pension)2) Oil distributor - used for oil distribution for chip sealing operations $22.87 p/hour + $5.72 fringe (fringe is all paid to pension)</text_data><comment_date>2015-04-10T00:00:00</comment_date></row><row _id="row-ct2b-d3bq-s35c" _uuid="00000000-0000-0000-BC3E-9C05D915D2C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ct2b-d3bq-s35c"><intent_id>556341</intent_id><project_id>704978</project_id><text_data>DIANA BARDWELL1412 S L STTACOMA, WAJOYCE PRICE1406 S 14TH STTACOMA, WATYRONE LEACH1642 E 34TH STTACOMA, WA</text_data><comment_date>2013-02-15T00:00:00</comment_date></row><row _id="row-neeq~ss7s.qn5r" _uuid="00000000-0000-0000-93CE-11A28835CB4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-neeq~ss7s.qn5r"><intent_id>764521</intent_id><project_id>791518</project_id><text_data>Job # 107884-001 related to 201500-001</text_data><comment_date>2016-05-26T00:00:00</comment_date></row><row _id="row-pkjq_w3vz~j467" _uuid="00000000-0000-0000-23D7-D11D3DBC8885" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pkjq_w3vz~j467"><intent_id>1246327</intent_id><project_id>1020126</project_id><text_data>74420-0119</text_data><comment_date>2022-07-05T00:00:00</comment_date></row><row _id="row-tv8c.gtjc~rb5a" _uuid="00000000-0000-0000-CED6-EE83746B66A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tv8c.gtjc~rb5a"><intent_id>603390</intent_id><project_id>691081</project_id><text_data>Project 3089-0048</text_data><comment_date>2013-11-06T00:00:00</comment_date></row><row _id="row-gqk3~k9j6-p3tg" _uuid="00000000-0000-0000-53FE-B2FE6DC450A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqk3~k9j6-p3tg"><intent_id>1279197</intent_id><project_id>1034457</project_id><text_data>Job # 220383</text_data><comment_date>2022-11-01T00:00:00</comment_date></row><row _id="row-ezft_umut.wck5" _uuid="00000000-0000-0000-262B-A81521C6F14C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezft_umut.wck5"><intent_id>753872</intent_id><project_id>788363</project_id><text_data>Inv #16432 $ 4,329.32</text_data><comment_date>2016-03-29T00:00:00</comment_date></row><row _id="row-sn8r-xf8s.sude" _uuid="00000000-0000-0000-49C2-8010A4D5C28B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sn8r-xf8s.sude"><intent_id>638487</intent_id><project_id>738368</project_id><text_data>JOB TO INCLUDE FURNISH &amp; INSTALL OF NEW ALUMINUM AHER DOORS. 6 X 7 SET OF DOORS, LEAFS WITH PANIC DEVICE. 8896 REMOVABLE MULLION LABOR</text_data><comment_date>2014-07-01T00:00:00</comment_date></row><row _id="row-x3pq_z8dd.ux84" _uuid="00000000-0000-0000-2452-DD8DF1E49D84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3pq_z8dd.ux84"><intent_id>461511</intent_id><project_id>667407</project_id><text_data>job#957842001 WSP AVT Bldg</text_data><comment_date>2011-06-20T00:00:00</comment_date></row><row _id="row-ppa3~7q9e_8ycq" _uuid="00000000-0000-0000-5944-F6F948511213" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ppa3~7q9e_8ycq"><intent_id>1218259</intent_id><project_id>1003910</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 6 for voice (telephone) and data (computer networking) indoors. POWERCOM JOB #959774</text_data><comment_date>2022-03-16T00:00:00</comment_date></row><row _id="row-zb5s~pm7r_etw7" _uuid="00000000-0000-0000-A561-13725A84197F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zb5s~pm7r_etw7"><intent_id>524221</intent_id><project_id>692275</project_id><text_data>Contractor License reinstated  8/8/12</text_data><comment_date>2012-08-09T00:00:00</comment_date></row><row _id="row-vn45~s2dn~ec8k" _uuid="00000000-0000-0000-4141-6E399B68F64B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vn45~s2dn~ec8k"><intent_id>1051719</intent_id><project_id>884482</project_id><text_data>JW, NEBF $1.73, H&amp;W $9.70, Pension $9.68, 401K $2.00, JATC $0.68. JTech, NEBF $1.15, H&amp;W $6.00, Pension $4.30, 401K $3.10, JATC $0.55.</text_data><comment_date>2020-04-15T00:00:00</comment_date></row><row _id="row-mf7z.8fme~ed73" _uuid="00000000-0000-0000-7054-D44EE6F5E485" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mf7z.8fme~ed73"><intent_id>673243</intent_id><project_id>752396</project_id><text_data>01/06/2015 Cathcart Quarterly01/06/2015 SWRTS Quarterly01/06/2015 ARTS Quarterly01/06/2015 NCRTS Quarterly</text_data><comment_date>2015-01-12T00:00:00</comment_date></row><row _id="row-wj3y_3j85_9ha9" _uuid="00000000-0000-0000-F075-7E4214C6929C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wj3y_3j85_9ha9"><intent_id>960172</intent_id><project_id>873177</project_id><text_data>KCDA</text_data><comment_date>2019-02-14T00:00:00</comment_date></row><row _id="row-wket.fk6d-p9x6" _uuid="00000000-0000-0000-405E-8CE683A5CE32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wket.fk6d-p9x6"><intent_id>744044</intent_id><project_id>767265</project_id><text_data>PEASE HIRED US</text_data><comment_date>2016-01-29T00:00:00</comment_date></row><row _id="row-vy8d.nfpg.585p" _uuid="00000000-0000-0000-A88A-8C2CC0FB844B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vy8d.nfpg.585p"><intent_id>876930</intent_id><project_id>838394</project_id><text_data>Change General Labor classification to Carpenter</text_data><comment_date>2018-04-23T00:00:00</comment_date></row><row _id="row-zf9n.4j2a_2jaf" _uuid="00000000-0000-0000-7C71-7D909B42593E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zf9n.4j2a_2jaf"><intent_id>1231564</intent_id><project_id>943468</project_id><comment_date>2022-06-23T00:00:00</comment_date></row><row _id="row-adgx-dvfs.9b4z" _uuid="00000000-0000-0000-979C-13AB31D61283" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-adgx-dvfs.9b4z"><intent_id>895105</intent_id><project_id>846817</project_id><text_data>Trucks are 12 yard end dumps, truck and trailers are 24 yard end dumps for hauling asphalt, rock and road construction related items.  Other trucks are 0 � 8,000 gallon water trucks used for road construction related items.</text_data><comment_date>2018-03-27T00:00:00</comment_date></row><row _id="row-yngu-hkjg-wm6s" _uuid="00000000-0000-0000-C46F-14791086F0E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yngu-hkjg-wm6s"><intent_id>586670</intent_id><project_id>715462</project_id><text_data>We have workers comp insurance with liberty nw in oregon</text_data><comment_date>2013-08-09T00:00:00</comment_date></row><row _id="row-4j3s~z8me~rhp5" _uuid="00000000-0000-0000-C5A1-BCDBD9950213" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4j3s~z8me~rhp5"><intent_id>667681</intent_id><project_id>749715</project_id><text_data>Job # 100499-001</text_data><comment_date>2014-11-26T00:00:00</comment_date></row><row _id="row-vydy-2ug9.fybh" _uuid="00000000-0000-0000-CDF1-6283E2AA4D0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vydy-2ug9.fybh"><intent_id>1140019</intent_id><project_id>959888</project_id><text_data>1. Diagnose &amp; repair furnace. 2. Mobile home. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2021-04-27T00:00:00</comment_date></row><row _id="row-a3th.4fgs-6uqs" _uuid="00000000-0000-0000-AA8E-17F5FA84DA5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a3th.4fgs-6uqs"><intent_id>655895</intent_id><project_id>735198</project_id><text_data>Contact # for owner/operator is 360-446-1693</text_data><comment_date>2014-09-22T00:00:00</comment_date></row><row _id="row-uqic_by2b-zq9e" _uuid="00000000-0000-0000-1262-ADA3074018C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uqic_by2b-zq9e"><intent_id>560815</intent_id><project_id>707129</project_id><text_data>This is a maintenance contract only.  We mow the lawn with power mowers, we rake the leaves with a hand rake, we do hand pulling of weeds, we use backpack gas blowers to cleanup grass clippings.  It is for the beautification of the landscaped areas only.  No construction involved.  No irrigation.</text_data><comment_date>2014-01-29T00:00:00</comment_date></row><row _id="row-du5n.s7x7_dbch" _uuid="00000000-0000-0000-F734-87D804A9BEC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-du5n.s7x7_dbch"><intent_id>1170825</intent_id><project_id>975889</project_id><text_data>1008998</text_data><comment_date>2021-08-19T00:00:00</comment_date></row><row _id="row-2mar.5sb5.8mzy" _uuid="00000000-0000-0000-DAD6-E83B487BCB88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2mar.5sb5.8mzy"><intent_id>558073</intent_id><project_id>703799</project_id><text_data>All work is performed in our Redmond Shop.</text_data><comment_date>2013-02-28T00:00:00</comment_date></row><row _id="row-brs7~kq9j-dtqj" _uuid="00000000-0000-0000-BFC3-B27A0963F583" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brs7~kq9j-dtqj"><intent_id>938538</intent_id><project_id>849979</project_id><text_data>PC6 - Job #6323Estimate 60337941CB</text_data><comment_date>2018-10-09T00:00:00</comment_date></row><row _id="row-ka5w.hcr8~vjsb" _uuid="00000000-0000-0000-3E60-9A2470465F10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ka5w.hcr8~vjsb"><intent_id>837277</intent_id><project_id>823056</project_id><text_data>Telecom tech(09)Inside workLAN(Local Area Network)</text_data><comment_date>2017-05-31T00:00:00</comment_date></row><row _id="row-xrc4_tqy9_hfpi" _uuid="00000000-0000-0000-F05E-2977C3BABDBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xrc4_tqy9_hfpi"><intent_id>1414310</intent_id><project_id>1117357</project_id><text_data>Project is an apartment unit owned by the Sunnyside housing authority</text_data><comment_date>2024-03-27T00:00:00</comment_date></row><row _id="row-btk3_sr5x-qvtf" _uuid="00000000-0000-0000-2087-09F511AD17EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-btk3_sr5x-qvtf"><intent_id>592858</intent_id><project_id>716623</project_id><text_data>043225</text_data><comment_date>2013-09-10T00:00:00</comment_date></row><row _id="row-6ajy.ncne~h9pd" _uuid="00000000-0000-0000-0A89-7CC7D1A323AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ajy.ncne~h9pd"><intent_id>1112190</intent_id><project_id>944841</project_id><text_data>09-20-055N</text_data><comment_date>2020-12-29T00:00:00</comment_date></row><row _id="row-5j96-rvp7_da38" _uuid="00000000-0000-0000-20A8-F1179078D409" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5j96-rvp7_da38"><intent_id>1038353</intent_id><project_id>908405</project_id><text_data>? 9840932</text_data><comment_date>2020-02-13T00:00:00</comment_date></row><row _id="row-ps6c~k3qw_gvkz" _uuid="00000000-0000-0000-65C0-79470FA3C98C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ps6c~k3qw_gvkz"><intent_id>712946</intent_id><project_id>769396</project_id><text_data>Filed by Debra BoswellPlanting native trees in the neighborhood with homeowner approval. Planting depth would be 2-3 feet deep, and in the homeowner�s yard. The homeowner will be responsible for watering and upkeep.</text_data><comment_date>2015-08-07T00:00:00</comment_date></row><row _id="row-zhpq.8dpk.7z6b" _uuid="00000000-0000-0000-3014-C58D59573A58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhpq.8dpk.7z6b"><intent_id>944425</intent_id><project_id>854000</project_id><text_data>Planting lawn approx 23,500 sq ft, Installation of topsoil approx 5&amp;quot; deep, Install granite boulders by machine, install stone pathway, Install grasses, shrubs, ground cover and trees.Mini excavator, and hand tools, wheel barrows and mulch blowing truck.</text_data><comment_date>2018-11-07T00:00:00</comment_date></row><row _id="row-7qv2-9my6-9m3f" _uuid="00000000-0000-0000-257A-12B57CF14591" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7qv2-9my6-9m3f"><intent_id>945361</intent_id><project_id>860066</project_id><text_data>Roll out weed fabric by hand and secure with jute net staples using a hammer. Use Bobcat to dump the engineered wood fiber in piles, use wheelbarrow to relocate wood fiber and spread by hand using rakes.</text_data><comment_date>2018-12-10T00:00:00</comment_date></row><row _id="row-we3b-zyg7~khb8" _uuid="00000000-0000-0000-D701-AC1B6D3DF604" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-we3b-zyg7~khb8"><intent_id>957991</intent_id><project_id>872122</project_id><text_data>STANDARD UNION BENEFIT PACKAGE, GLAZIERS &amp; GLASSWORKERS UNION LOCAL #188JOURNEYMAN GLAZIER:DRUG TESTING/WCISAP $0.06, PENSION $10.50, HEALTH &amp; WELFARE $6.56, APPRENTICESHIP $1.00, LMCI $0.10 WAGE INCREASED TO $46.34/HR FRINGE BENEFITS INCREASED TO $18.22/HR JOURNEYMAN LEVEL WAGE: $46.34/HRTOTAL PACKAGE $64.56 (EFFECTIVE JANUARY 1, 2019 THROUGH JUNE 30, 2019)</text_data><comment_date>2019-01-31T00:00:00</comment_date></row><row _id="row-7zdh_f97b_p5uv" _uuid="00000000-0000-0000-1173-28E711C2F2A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zdh_f97b_p5uv"><intent_id>891106</intent_id><project_id>845041</project_id><text_data>LONG JOB NUMBER 5050.180034</text_data><comment_date>2018-03-05T00:00:00</comment_date></row><row _id="row-erfc.m58y~cin9" _uuid="00000000-0000-0000-B75F-5DEB9F0F9D95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-erfc.m58y~cin9"><intent_id>702884</intent_id><project_id>765705</project_id><text_data>Installing Milliken carpet.</text_data><comment_date>2015-06-23T00:00:00</comment_date></row><row _id="row-kpqx-7esi~rybj" _uuid="00000000-0000-0000-BCC5-99AA40297376" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kpqx-7esi~rybj"><intent_id>563645</intent_id><project_id>708401</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.</text_data><comment_date>2013-04-08T00:00:00</comment_date></row><row _id="row-xjiz~hebk~8h7r" _uuid="00000000-0000-0000-FCEB-69D00EA56DBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xjiz~hebk~8h7r"><intent_id>689530</intent_id><project_id>760156</project_id><text_data>It is for Fiber routers, and fiber switching for telephone cablingTruck Driver:  Employee drives company Dodge 250 Ram truck to/from job site</text_data><comment_date>2015-04-17T00:00:00</comment_date></row><row _id="row-wn4u-cgsa-a9xu" _uuid="00000000-0000-0000-F555-0AD1744F952F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wn4u-cgsa-a9xu"><intent_id>1010922</intent_id><project_id>894757</project_id><text_data>'Truck Driver/Other Trucks' classification is for a Water Truck</text_data><comment_date>2019-10-01T00:00:00</comment_date></row><row _id="row-g7xy~2jkm.mgqm" _uuid="00000000-0000-0000-7ED0-9A789226D839" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g7xy~2jkm.mgqm"><intent_id>766721</intent_id><project_id>793840</project_id><text_data>1) Restoration  2) apartment 3) two stories 4)a)no  b)no  c)yes  d)no  e)no  f)no  g)no  h)no  i)no  j)yes k)n/a5) yes 6)yes 7)yes 8)no</text_data><comment_date>2016-06-07T00:00:00</comment_date></row><row _id="row-sgnv~8qej_nakd" _uuid="00000000-0000-0000-BE3F-B58A2CB17AD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sgnv~8qej_nakd"><intent_id>983490</intent_id><project_id>883736</project_id><text_data>OTHER TRUCK WAS A WATER TRUCK</text_data><comment_date>2019-06-10T00:00:00</comment_date></row><row _id="row-ztb3~3ttp_vhz6" _uuid="00000000-0000-0000-3A2E-C413874C0A6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ztb3~3ttp_vhz6"><intent_id>622433</intent_id><project_id>725275</project_id><text_data>Added General Laborer</text_data><comment_date>2014-04-03T00:00:00</comment_date></row><row _id="row-awhz-vqku-83bj" _uuid="00000000-0000-0000-F1EB-59E3B013CF50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-awhz-vqku-83bj"><intent_id>948421</intent_id><project_id>867667</project_id><text_data>1001163 USP swap</text_data><comment_date>2018-11-30T00:00:00</comment_date></row><row _id="row-6vmh-sgfj.c6vc" _uuid="00000000-0000-0000-1976-510FB6BB8122" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6vmh-sgfj.c6vc"><intent_id>1244507</intent_id><project_id>1019510</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-07-27T00:00:00</comment_date></row><row _id="row-i9se~su9q.wbwp" _uuid="00000000-0000-0000-A490-FF2EA700E2C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9se~su9q.wbwp"><intent_id>1115771</intent_id><project_id>946896</project_id><text_data>RemodelSingle Family Home1Residential Livinga)no b)no c)no d)no e)no f)no g)no h)no i)no j)no k)no l)no5 yes- homes with kitchen6 yes- homes with bathrooms7 no8 no</text_data><comment_date>2021-01-18T00:00:00</comment_date></row><row _id="row-g6ms.x58e_bv4p" _uuid="00000000-0000-0000-E531-2DC4AD301FBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g6ms.x58e_bv4p"><intent_id>1155968</intent_id><project_id>968431</project_id><text_data>ICI Job# 1318</text_data><comment_date>2021-06-28T00:00:00</comment_date></row><row _id="row-3a4n~8d73.iabc" _uuid="00000000-0000-0000-8CA6-DBF9F283B601" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3a4n~8d73.iabc"><intent_id>694511</intent_id><project_id>758384</project_id><text_data>1. Drywall installing &amp; taping2. Other Residential structure3. Single Story4. Group Residence for youth and young adultsNo, no, yes, no, no, no, no, no, no  yes5. No6. Yes7. No8. No</text_data><comment_date>2015-05-14T00:00:00</comment_date></row><row _id="row-pkju_vhrc~we4q" _uuid="00000000-0000-0000-1A05-76A1239F5C18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pkju_vhrc~we4q"><intent_id>1167701</intent_id><project_id>974375</project_id><text_data>Clean up weeds overgrown at Indian Horse corral.  Hand weeding and weed whacking with a weed eater to clean up over grown area at the horse corral.</text_data><comment_date>2021-08-10T00:00:00</comment_date></row><row _id="row-5ye9-8p9v~gnhq" _uuid="00000000-0000-0000-E609-2969CC2233A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ye9-8p9v~gnhq"><intent_id>583689</intent_id><project_id>716336</project_id><text_data>DEI Job 12540</text_data><comment_date>2013-07-26T00:00:00</comment_date></row><row _id="row-wpiu.hqvj~tzyk" _uuid="00000000-0000-0000-EC7D-6F14C543436B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wpiu.hqvj~tzyk"><intent_id>1146096</intent_id><project_id>963156</project_id><text_data>Invoice #127903 drain cleaning</text_data><comment_date>2021-05-19T00:00:00</comment_date></row><row _id="row-f3wm~d8b3_59d8" _uuid="00000000-0000-0000-6FDC-AA6119533AC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f3wm~d8b3_59d8"><intent_id>1020506</intent_id><project_id>898957</project_id><text_data>Other Trucks = Lowboys and Water trucks</text_data><comment_date>2019-11-07T00:00:00</comment_date></row><row _id="row-7f58~eppr~ff3c" _uuid="00000000-0000-0000-8B43-29EF669C7442" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7f58~eppr~ff3c"><intent_id>1117873</intent_id><project_id>948094</project_id><text_data>Centennial project 74510-0017</text_data><comment_date>2021-01-26T00:00:00</comment_date></row><row _id="row-j9s5~qbc6.gxxq" _uuid="00000000-0000-0000-9066-7397ED2CDE83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j9s5~qbc6.gxxq"><intent_id>821460</intent_id><project_id>815940</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION BUNDLE OF 10 JOBS. THEY ARE ALL SINGLE FAMILY, RESIDENTIAL DWELLINGS.1. 1300 ASHUE RD, WAPATO2. 309 ADAMS ST, GRANDVIEW3. 505 S TIETON AVE, WAPATO4. 231 MCDONALD RD, TOPPENISH5. 111 PANSY LN, WAPATO6. 402 MAPLE AVE #23, SUNNYSIDE7. 610 S YAKIMA AVE, WAPATO</text_data><comment_date>2017-03-17T00:00:00</comment_date></row><row _id="row-cw7u_ie8g_s4tx" _uuid="00000000-0000-0000-EDD4-F4407961745B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cw7u_ie8g_s4tx"><intent_id>696875</intent_id><project_id>759318</project_id><text_data>We will install the Landscaping at a new school project. We will install the landscaping &amp; sprinkler irrigation; concrete curbing between the lawn &amp; beds; sod and hydro-seed in the lawn areas; plant material, placing fabric, &amp; rock. Used hand tools such as shovels, rakes, pipe cutters &amp; etc. Equipment was less than 90 HP � mini excavator, small skit steer &amp; trailer hydro-seeder.</text_data><comment_date>2015-05-27T00:00:00</comment_date></row><row _id="row-7vey_aw8z~5ygz" _uuid="00000000-0000-0000-30FE-A770A52F0EE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7vey_aw8z~5ygz"><intent_id>1252459</intent_id><project_id>1023634</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-08-09T00:00:00</comment_date></row><row _id="row-7g9f-unfx.md6a" _uuid="00000000-0000-0000-C8C0-65F40AF14590" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7g9f-unfx.md6a"><intent_id>776261</intent_id><project_id>796231</project_id><text_data>Burrow</text_data><comment_date>2016-07-20T00:00:00</comment_date></row><row _id="row-damk.fbkw~p5tk" _uuid="00000000-0000-0000-6879-20A2F1330374" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-damk.fbkw~p5tk"><intent_id>563253</intent_id><project_id>710976</project_id><text_data>1.  Our license does not expire until 20142. Scope of work is: UG Fiber Optic Campus Backbone(exterior) and Category 6 Telecommunications Circuits (Indoor).</text_data><comment_date>2013-04-10T00:00:00</comment_date></row><row _id="row-5h2k-t7ys_prdd" _uuid="00000000-0000-0000-8439-D3526F8D9F4E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5h2k-t7ys_prdd"><intent_id>1223502</intent_id><project_id>1001953</project_id><text_data>2N59-0061</text_data><comment_date>2022-04-06T00:00:00</comment_date></row><row _id="row-jz23~rr97-68qw" _uuid="00000000-0000-0000-D9A2-24267DA0D6DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jz23~rr97-68qw"><intent_id>895012</intent_id><project_id>721411</project_id><text_data>0316041</text_data><comment_date>2018-03-27T00:00:00</comment_date></row><row _id="row-q3dp.ahqe~xqb9" _uuid="00000000-0000-0000-23DB-10DFF1EFD7C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q3dp.ahqe~xqb9"><intent_id>1048852</intent_id><project_id>914348</project_id><text_data>Adler project # 20-008</text_data><comment_date>2020-03-31T00:00:00</comment_date></row><row _id="row-js7z~cffe.6j48" _uuid="00000000-0000-0000-B3CD-11517BA88C0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-js7z~cffe.6j48"><intent_id>781468</intent_id><project_id>759281</project_id><text_data>Hired subcontractor to deliver playground surfacing (wood chips) and blow material onto playground surface where prime contractor specified.</text_data><comment_date>2016-08-26T00:00:00</comment_date></row><row _id="row-4c6a_ac92~kv9s" _uuid="00000000-0000-0000-ABA4-C9CCE1A4097E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4c6a_ac92~kv9s"><intent_id>1266589</intent_id><project_id>1031031</project_id><text_data>IFS WO# 128142, South Transfer Station - Seattle, install 10 yards of potting soil to beds to raise the grade after we will be installing 6 2 man boulders to the end of the beds, installing 86 (Eounymous Alatus Compactus) to the same beds for plant coverage in the area followed by 6 yards of Medium Beauty Bark.</text_data><comment_date>2022-09-14T00:00:00</comment_date></row><row _id="row-sdnj-6te9_ix67" _uuid="00000000-0000-0000-A0E0-585F7D38618A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sdnj-6te9_ix67"><intent_id>561946</intent_id><project_id>663195</project_id><text_data>Health Security			$6.77Pension				$9.20Apprenticeship			  $.63Annuity				$4.00IMPACT				$0.28</text_data><comment_date>2013-03-27T00:00:00</comment_date></row><row _id="row-rkpb-dt3p.k3ew" _uuid="00000000-0000-0000-7BF0-7010A1A00B6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rkpb-dt3p.k3ew"><intent_id>1229561</intent_id><project_id>1007017</project_id><text_data>Project # 922054Contract # 10270Job# 220182Richart- Ingle</text_data><comment_date>2022-04-28T00:00:00</comment_date></row><row _id="row-wucr.knrs~j9ju" _uuid="00000000-0000-0000-B44A-1F8F482C3E27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wucr.knrs~j9ju"><intent_id>628615</intent_id><project_id>734568</project_id><text_data>Clean transmission fluid from catch basinHazWaste Worker to clean area of all debrisMotorPatrol Grader to vacuum all hazwaste materials</text_data><comment_date>2014-05-08T00:00:00</comment_date></row><row _id="row-9fgj.z8a7_2wkm" _uuid="00000000-0000-0000-6264-30899E4B1EC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9fgj.z8a7_2wkm"><intent_id>643894</intent_id><project_id>739259</project_id><text_data>Form filed by: Steve Horning</text_data><comment_date>2014-07-28T00:00:00</comment_date></row><row _id="row-rk8r~pey9~8xn3" _uuid="00000000-0000-0000-86D3-3CAC8FAD03A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rk8r~pey9~8xn3"><intent_id>832350</intent_id><project_id>809342</project_id><text_data>This is a 26&amp;#39; flatbed truck</text_data><comment_date>2017-05-11T00:00:00</comment_date></row><row _id="row-g39i~wtau~n7cz" _uuid="00000000-0000-0000-9ABD-95DBD37F10D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g39i~wtau~n7cz"><intent_id>490198</intent_id><project_id>678610</project_id><text_data>MidMountain Contractors, Inc. the Prime will complete an Intent for all JOC Work Orders for vendors to link to with the new Intent/Affidavit forms online.  MidMountain will only complete one Affidavit of Wages Paid under our Master Contract (Intent ID No. 333022).</text_data><comment_date>2011-11-21T00:00:00</comment_date></row><row _id="row-9fur.mnkg_4dbj" _uuid="00000000-0000-0000-A226-AD7AE71A658A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9fur.mnkg_4dbj"><intent_id>449923</intent_id><project_id>661860</project_id><text_data>Could you possibly delete form #445969?  I filled out that intent for the wrong project.  SeaWest Construction, Inc. is not doing any work on that project.  Thanks.  Robert Holmgren (206-459-2784)</text_data><comment_date>2011-04-05T00:00:00</comment_date></row><row _id="row-w9wf-z9c2.crxh" _uuid="00000000-0000-0000-29CC-93D0700B3733" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9wf-z9c2.crxh"><intent_id>665461</intent_id><project_id>747041</project_id><text_data>Dawn Robinson 3282 Horseshoe RdOak Harbor, WA  98277</text_data><comment_date>2014-11-13T00:00:00</comment_date></row><row _id="row-fnvx.v4ny~4ujq" _uuid="00000000-0000-0000-8E81-E8F1E9A7D67C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fnvx.v4ny~4ujq"><intent_id>1131631</intent_id><project_id>878076</project_id><text_data>117482-001</text_data><comment_date>2021-03-25T00:00:00</comment_date></row><row _id="row-p84k.6wnf.hjww" _uuid="00000000-0000-0000-277E-E44892AF94F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p84k.6wnf.hjww"><intent_id>708909</intent_id><project_id>729802</project_id><text_data>no</text_data><comment_date>2015-07-21T00:00:00</comment_date></row><row _id="row-ee3r.6tnk_jecs" _uuid="00000000-0000-0000-9683-959C37602DD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ee3r.6tnk_jecs"><intent_id>561011</intent_id><project_id>649167</project_id><text_data>Hello Prevailing Wage Division, Please be aware this was a Service Contract with the King County agency (Open Order project) was for termination work and to replace devices for their fire alarm systems and did not involve in any way HVAC work of any kind.  Please see below line item (c) in section (1) of the WAC 296-127-01322 State of Washington code that lists Fire alarm and burglar systems as one of the listed job descriptions for the Electronic Technicians.  Let us know if it is still necessary to update our Intent filing per the clarification of our Fire &amp; Life Safety project description. WAC 296-127-01322	Electronic technicians.  (1) For the purpose of the Washington state public works law, chapter 39.12 RCW, electronic technicians install, operate, inspect, maintain, repair, and service:     (a) Radio, television and recording systems and devices;     (b) Systems for paging, intercommunication, public address, wired music, clocks, security and surveillance systems and mobile radio systems; and     (c) Fire alarm and burglar systems.Thank you for your consideration,Michael</text_data><comment_date>2013-03-21T00:00:00</comment_date></row><row _id="row-2uyx-hfpv-j64v" _uuid="00000000-0000-0000-DBC1-8F9FA8478356" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2uyx-hfpv-j64v"><intent_id>648484</intent_id><project_id>714125</project_id><text_data>Clening Seattle Union Station Interior, Auburn Station In/Out,Kent Station In/Out</text_data><comment_date>2014-08-19T00:00:00</comment_date></row><row _id="row-ws2c~57cp-yhsu" _uuid="00000000-0000-0000-6875-D49422A84147" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ws2c~57cp-yhsu"><intent_id>857236</intent_id><project_id>736747</project_id><text_data>From: Shaina Morgan [mailto:Shaina.Morgan@patriotfire.com] Sent: Thursday, October 19, 2017 10:42 AMTo: LNI RE Prevailing Wage Worker 1 &amp;lt;PW1@LNI.WA.GOV&amp;gt;Subject: Note Added to Intent Good Morning,We are being asked to add a note in the notes section of an intent we filed in August.Intent #:857236Note: BP402 90194Thank you!</text_data><comment_date>2017-10-20T00:00:00</comment_date></row><row _id="row-bj84_gs92.w6k7" _uuid="00000000-0000-0000-E424-5E44604471BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bj84_gs92.w6k7"><intent_id>678944</intent_id><project_id>748689</project_id><text_data>JCI Project # 5088-0152</text_data><comment_date>2015-02-12T00:00:00</comment_date></row><row _id="row-5hsk-654d_tpw7" _uuid="00000000-0000-0000-DF4D-E70D63F2883C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5hsk-654d_tpw7"><intent_id>504578</intent_id><project_id>683314</project_id><text_data>Work consists of landscaping improved areas of a city park. This includes planting plants, laying mulch, installing and incorporating compost. Irrigation system to be installed. Lawn to be hydroseeded. 'Other Trucks' category is the truck used to tow trailer mounted hydroseeder. All irrigation lines installed 12-18&amp;quot; deep.</text_data><comment_date>2012-03-20T00:00:00</comment_date></row><row _id="row-d75j~aevh-nfu3" _uuid="00000000-0000-0000-EDF4-E9AFCB36545E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d75j~aevh-nfu3"><intent_id>656758</intent_id><project_id>745227</project_id><text_data>#134 toilet leak, found leak at toilet supply line, replaces as needed. Replaced 3/8x1/2 supply, tested ok.</text_data><comment_date>2014-09-25T00:00:00</comment_date></row><row _id="row-3t4t-heg4~u65j" _uuid="00000000-0000-0000-6A55-65DA8ABBA3FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3t4t-heg4~u65j"><intent_id>1208356</intent_id><project_id>997621</project_id><text_data>9885993</text_data><comment_date>2022-02-01T00:00:00</comment_date></row><row _id="row-25vn.8pwm.ybn3" _uuid="00000000-0000-0000-0DB6-490568F702A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-25vn.8pwm.ybn3"><intent_id>1135886</intent_id><project_id>954361</project_id><text_data>Fringe benefit for Laborers totals $12.44 and the total amount goes to 401K plan.  Fringe benefit for Power Equipment Operator totals $22.47 and the total amount goes to 401K plan.</text_data><comment_date>2021-04-19T00:00:00</comment_date></row><row _id="row-yk3f_cvak.sz6a" _uuid="00000000-0000-0000-45CA-140F279D9D6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yk3f_cvak.sz6a"><intent_id>879527</intent_id><project_id>839576</project_id><text_data>Job #109319-001</text_data><comment_date>2017-12-15T00:00:00</comment_date></row><row _id="row-6ad7-jfhx.q4bs" _uuid="00000000-0000-0000-502C-4EBCC8602DE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ad7-jfhx.q4bs"><intent_id>676996</intent_id><project_id>734363</project_id><text_data>As our position is to only splice the fiber after it has been placed, we spliced the cable for phone and internet with in the premises.  on this job we did not work outside only in splicing the fiber optic cable for phone and internet usage.</text_data><comment_date>2015-02-16T00:00:00</comment_date></row><row _id="row-ckba_pugm_zn9z" _uuid="00000000-0000-0000-2D79-CEB68C16CA84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ckba_pugm_zn9z"><intent_id>604734</intent_id><project_id>723988</project_id><text_data>Scope of work: remove and replace soil (depth less than 3 ft), install plant material and mulch with excavator, shovels, rakes, buckets,wheelbarrows, hand tools, and Ford F550 truck.</text_data><comment_date>2013-11-15T00:00:00</comment_date></row><row _id="row-sbdp-7fsc~yi23" _uuid="00000000-0000-0000-F5C0-66A4076A2B92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sbdp-7fsc~yi23"><intent_id>552896</intent_id><project_id>703436</project_id><text_data>P8044</text_data><comment_date>2013-01-22T00:00:00</comment_date></row><row _id="row-sna4_zkcg-cjsa" _uuid="00000000-0000-0000-5A4F-7142D2610A86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sna4_zkcg-cjsa"><intent_id>1175952</intent_id><project_id>978418</project_id><text_data>Hm Job 4214</text_data><comment_date>2021-09-08T00:00:00</comment_date></row><row _id="row-tvkt.2zbv_yufp" _uuid="00000000-0000-0000-8F62-51F6F2D4EC95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tvkt.2zbv_yufp"><intent_id>1034088</intent_id><project_id>905906</project_id><text_data>This is a contract for landscape maintenance for Cathcart Operations Center located in Snohomish, Washington in the county of Snohomish.  Maintenance will include mowing, edging, trimming, weeding, raking, blowing, and retention pond clean up to four times a year.  Regular maintenance  will be from April1, 2020 through 10/31/2020.  Equipment to be used will be mowers, trimmers, hedgers, backpack blowers for clean up, hand tools, shovels, rakes, hand pruners, and buckets to be used on established landscape turf and bed areas.</text_data><comment_date>2020-01-27T00:00:00</comment_date></row><row _id="row-tt4e.cxmz.bvqq" _uuid="00000000-0000-0000-FBEC-6DCC0328509E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tt4e.cxmz.bvqq"><intent_id>1257030</intent_id><project_id>1025990</project_id><text_data>Client currently has a gas furnace that is not working properly, heating mechanics will be replacing the furnace with like and kind gas furnace. Connecting furnace to existing duct work and staying in the same location. If additional work is needed by other trades once project starts, they will be listed on the affidavit.</text_data><comment_date>2022-08-26T00:00:00</comment_date></row><row _id="row-shmj_gge4_edka" _uuid="00000000-0000-0000-A827-0E4E711F6B59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-shmj_gge4_edka"><intent_id>790600</intent_id><project_id>802949</project_id><text_data>Other Trucks = Water Truck 1995 Ford LTA9000 56,000 GWT</text_data><comment_date>2016-09-20T00:00:00</comment_date></row><row _id="row-z9qy~ptir~t77y" _uuid="00000000-0000-0000-66D3-81B9C0239D2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z9qy~ptir~t77y"><intent_id>987952</intent_id><project_id>885711</project_id><text_data>Weeds and debris removed using hand tools and hand held blower.  Rock installed using shovels and wheelbarrows.</text_data><comment_date>2019-06-26T00:00:00</comment_date></row><row _id="row-3zp6-dncs_pn6m" _uuid="00000000-0000-0000-09CA-6F3639E15C13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3zp6-dncs_pn6m"><intent_id>659386</intent_id><project_id>746222</project_id><text_data>Wine Building</text_data><comment_date>2014-10-09T00:00:00</comment_date></row><row _id="row-c7xc.79z3_zc7y" _uuid="00000000-0000-0000-76E0-A7454E07719D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c7xc.79z3_zc7y"><intent_id>779892</intent_id><project_id>798845</project_id><text_data>Filed by Mark Remers</text_data><comment_date>2016-08-04T00:00:00</comment_date></row><row _id="row-mqyn.3egm~s88f" _uuid="00000000-0000-0000-D1AA-5BCC5198AA67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mqyn.3egm~s88f"><intent_id>870699</intent_id><project_id>832953</project_id><text_data>Active Job Number 17-029</text_data><comment_date>2017-10-23T00:00:00</comment_date></row><row _id="row-8pjc_xes3_6bbr" _uuid="00000000-0000-0000-FA55-DA6C281EF63E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8pjc_xes3_6bbr"><intent_id>643119</intent_id><project_id>740044</project_id><text_data>Form filed by: Carlos Hale</text_data><comment_date>2014-07-23T00:00:00</comment_date></row><row _id="row-bqpa-cvzf-qqp9" _uuid="00000000-0000-0000-0D82-3A8BA7D2E3D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bqpa-cvzf-qqp9"><intent_id>512747</intent_id><project_id>687960</project_id><text_data>Irrigation and Sprinkler Installation Laborer � dig ditches by hand, lay and glue pipe, assemble sprinklers, and back fill ditchesLandscape and plant laborer � planting, grading with shovels, picking rocks, raking, laying sod and sweepingBackhoe operator for removal and movement of soil, rocks, trees.</text_data><comment_date>2012-05-20T00:00:00</comment_date></row><row _id="row-xgvn.h3ib-dsar" _uuid="00000000-0000-0000-7E66-B735ACE3A402" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xgvn.h3ib-dsar"><intent_id>767955</intent_id><project_id>794304</project_id><text_data>PO #0071500081</text_data><comment_date>2016-06-13T00:00:00</comment_date></row><row _id="row-vx2q.32yh~kwcz" _uuid="00000000-0000-0000-E5D1-AFEE55027F4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vx2q.32yh~kwcz"><intent_id>880918</intent_id><project_id>840268</project_id><text_data>Motor Patrol Grader to vacuum area of all debris for new pole placement</text_data><comment_date>2017-12-27T00:00:00</comment_date></row><row _id="row-fnyj-3h32_df97" _uuid="00000000-0000-0000-BC4B-026F261DD74C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fnyj-3h32_df97"><intent_id>666296</intent_id><project_id>738437</project_id><text_data>Form filed by: Mark Tuson</text_data><comment_date>2014-11-18T00:00:00</comment_date></row><row _id="row-eifw-2mu3-bpwt" _uuid="00000000-0000-0000-07EF-F1B8FB4C2D09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eifw-2mu3-bpwt"><intent_id>957142</intent_id><project_id>871718</project_id><text_data>Install cables that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2019-01-25T00:00:00</comment_date></row><row _id="row-9gg6-ff9a~2e5f" _uuid="00000000-0000-0000-0639-966AFD608EDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9gg6-ff9a~2e5f"><intent_id>774005</intent_id><project_id>792075</project_id><text_data>Rita Foley 3878 Blue Canyon Rd Sedro Woolley, WA 98284</text_data><comment_date>2016-07-11T00:00:00</comment_date></row><row _id="row-db6x_sy5t.t7ed" _uuid="00000000-0000-0000-6042-E444C9577574" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-db6x_sy5t.t7ed"><intent_id>1210482</intent_id><project_id>998916</project_id><text_data>Truck Driver rate is paid to employees driving company issued trucks to transport materials/supplies pertaining to the job site.</text_data><comment_date>2022-02-09T00:00:00</comment_date></row><row _id="row-2nw6_5rqn.abtn" _uuid="00000000-0000-0000-7B84-2774D1CFB2DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2nw6_5rqn.abtn"><intent_id>526374</intent_id><project_id>693084</project_id><text_data>Note #1: 3 Bedroom Group home run by DSHS. Note #2: Landscape work includes spreading topsoil and restoration of landscape area</text_data><comment_date>2012-08-03T00:00:00</comment_date></row><row _id="row-3e5r.8wz4~h5qn" _uuid="00000000-0000-0000-F4B3-74006BE01F69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3e5r.8wz4~h5qn"><intent_id>751640</intent_id><project_id>783268</project_id><text_data>Filed by Misael Ayala</text_data><comment_date>2016-03-16T00:00:00</comment_date></row><row _id="row-c74q_yys7~unt2" _uuid="00000000-0000-0000-E437-09D3C6D4E928" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c74q_yys7~unt2"><intent_id>1187131</intent_id><project_id>974007</project_id><text_data>We pay 100% employee Health Care Premiums as part of their Fringe//CC</text_data><comment_date>2021-10-20T00:00:00</comment_date></row><row _id="row-a38b-nsx7-ksd4" _uuid="00000000-0000-0000-374E-3C3B31F53D55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a38b-nsx7-ksd4"><intent_id>695728</intent_id><project_id>762783</project_id><text_data>***This form is being approved on the basis of your statement that your contracted work is not covered under the prevailing wage statutes and rules per the provisions under SSB 5538, which passed in the 2011-2012 biennium, and was adopted into RCW 79A.35.130. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2015-05-22T00:00:00</comment_date></row><row _id="row-p27j-zp2g~33i2" _uuid="00000000-0000-0000-DC43-05F646A5BB29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p27j-zp2g~33i2"><intent_id>778314</intent_id><project_id>798268</project_id><text_data>This new Intent will replace ID:  776289 filed on the 20th of July and approved on the 27th.</text_data><comment_date>2016-07-28T00:00:00</comment_date></row><row _id="row-47a9_rgfw-enps" _uuid="00000000-0000-0000-22D2-35DAE94BCED6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-47a9_rgfw-enps"><intent_id>641427</intent_id><project_id>736167</project_id><text_data>Form filed by: Steve Skaglund</text_data><comment_date>2014-07-16T00:00:00</comment_date></row><row _id="row-6kwv~f7h6-6338" _uuid="00000000-0000-0000-3DD2-9E676DDD9F5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6kwv~f7h6-6338"><intent_id>795919</intent_id><project_id>804937</project_id><text_data>WO #8017218</text_data><comment_date>2016-10-14T00:00:00</comment_date></row><row _id="row-mwev.ckeb.tbqu" _uuid="00000000-0000-0000-F737-94CD37E74BF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mwev.ckeb.tbqu"><intent_id>1317654</intent_id><project_id>1062153</project_id><text_data>Provide routine landscape maintenance including lawn mowing, plant maintenance and irrigation montioring</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-eafh.yyti.f6at" _uuid="00000000-0000-0000-BC49-8CF1C4C86F37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eafh.yyti.f6at"><intent_id>515645</intent_id><project_id>689103</project_id><text_data>Filed by: Torie Allen</text_data><comment_date>2012-06-07T00:00:00</comment_date></row><row _id="row-gu7u_jix5-j884" _uuid="00000000-0000-0000-AA9A-9E8479E69A7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gu7u_jix5-j884"><intent_id>1317769</intent_id><project_id>1062235</project_id><text_data>THIS IS A 1 YEAR CONTRACT FOR THE CITY</text_data><comment_date>2023-04-07T00:00:00</comment_date></row><row _id="row-j3w3_9r2i-e4pi" _uuid="00000000-0000-0000-5EF8-B47C776D4091" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j3w3_9r2i-e4pi"><intent_id>701703</intent_id><project_id>764042</project_id><text_data>We will be planting, seeding, and fertilizing.</text_data><comment_date>2015-06-18T00:00:00</comment_date></row><row _id="row-y4ge-2vzw~usg5" _uuid="00000000-0000-0000-B48A-7B92BF131D6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y4ge-2vzw~usg5"><intent_id>534790</intent_id><project_id>690997</project_id><text_data>Fringe Benefits$10.86 is what is stated on the federal wage ratesThe federal rates are higher then the state rates for this job.</text_data><comment_date>2012-09-17T00:00:00</comment_date></row><row _id="row-hchq.e7hr.xbx3" _uuid="00000000-0000-0000-76E4-DA9D91DFA1BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hchq.e7hr.xbx3"><intent_id>825514</intent_id><project_id>815708</project_id><text_data>Filed by John Ketola</text_data><comment_date>2017-04-10T00:00:00</comment_date></row><row _id="row-emsc-cq89.k68w" _uuid="00000000-0000-0000-3648-0855760D8CB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-emsc-cq89.k68w"><intent_id>794809</intent_id><project_id>804528</project_id><text_data>Open PO</text_data><comment_date>2016-10-09T00:00:00</comment_date></row><row _id="row-q3gg~7xc6.9jct" _uuid="00000000-0000-0000-884F-A3BD48DA0BB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q3gg~7xc6.9jct"><intent_id>694405</intent_id><project_id>762083</project_id><text_data>WORKERS COMP CARRIER-SAIF CORP-POLICY # 947202. WE DON&amp;#39;T HAVE ANY EMPLOYEES THAT ARE RESIDENTS OF WA.ALL OF OUR $9.00 PER HOUR FRINGE GOES TO THE UNEMPLOYMENT BENEFIT PLAN</text_data><comment_date>2015-05-13T00:00:00</comment_date></row><row _id="row-pu6z.rvrh-tht7" _uuid="00000000-0000-0000-91FD-3DBCAC533382" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pu6z.rvrh-tht7"><intent_id>681347</intent_id><project_id>756630</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2015-02-27T00:00:00</comment_date></row><row _id="row-2rjd.85pf-8xga" _uuid="00000000-0000-0000-31AC-1D16B4331E8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2rjd.85pf-8xga"><intent_id>801743</intent_id><project_id>807394</project_id><text_data>2041 moon rd Connell Wa 99326</text_data><comment_date>2016-11-16T00:00:00</comment_date></row><row _id="row-3r4q~p5us.z8d7" _uuid="00000000-0000-0000-E30C-52C8B4D8B059" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3r4q~p5us.z8d7"><intent_id>644786</intent_id><project_id>740674</project_id><text_data>Filed by Anthony M. Santana.</text_data><comment_date>2014-07-31T00:00:00</comment_date></row><row _id="row-3gt6_qxeu.kb42" _uuid="00000000-0000-0000-94D1-2C186AE89EF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gt6_qxeu.kb42"><intent_id>605626</intent_id><project_id>720337</project_id><text_data>We want to use Apprentices if they are available.</text_data><comment_date>2013-11-21T00:00:00</comment_date></row><row _id="row-b6j3-5b4q-n4pr" _uuid="00000000-0000-0000-530B-AEA14CE801F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b6j3-5b4q-n4pr"><intent_id>822780</intent_id><project_id>816514</project_id><text_data>Install new sidewalk, mow curb and repair landscape.  Other Truck is 2000 gl water truck.</text_data><comment_date>2017-03-26T00:00:00</comment_date></row><row _id="row-dmqu-cyrm-edve" _uuid="00000000-0000-0000-B9C4-8CB6E889AF26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dmqu-cyrm-edve"><intent_id>891307</intent_id><project_id>763165</project_id><text_data>Difference in pay rate due to contractors working on project in 2016. Operating fork lift. Hanging doors, counter tops, &amp;quot;finish work&amp;quot; in an elementary school.</text_data><comment_date>2018-03-06T00:00:00</comment_date></row><row _id="row-sv4v-8c6p.n9hg" _uuid="00000000-0000-0000-7591-AD6A690C8F8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sv4v-8c6p.n9hg"><intent_id>931949</intent_id><project_id>861109</project_id><text_data>(1)WINDOWS (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO, B-NO, C-YES, D-NO, E-NO, F-NO, G-NO, H-NO, I-NO, J-NO, K-? (5)YES (6)YES (7)NO (8)NO</text_data><comment_date>2018-09-11T00:00:00</comment_date></row><row _id="row-ibwk_ezk2.8xks" _uuid="00000000-0000-0000-49B0-A32269F5B107" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ibwk_ezk2.8xks"><intent_id>558657</intent_id><project_id>706142</project_id><text_data>1.	What was the purpose of the project? Provide software programming to migrate 2 existing field panels to the latest product platform2.	Does this project entail the remodeling or new construction of a facility? No3.	What specific tasks did your employees perform? Siemens� BAU Technicians perform their work strictly on laptop computers, both remotely and on-site during the commissioning process. While off-site the BAU Technicians create a computerized schematic of a particular buildings HVAC automations system. That system is used to control the systems functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly the BAU Technician trains the end-user about the automation system functionality again using a computer interface. Importantly, BAU Technicians do not use trade tools such as drills or wrenches. 4.	What if any tools did your employees use in the performance of those tasks? Laptop computer.5.	If your employee used no tools, did they engage in any other type of manual, hands on efforts in completing their tasks? No-none.</text_data><comment_date>2013-03-05T00:00:00</comment_date></row><row _id="row-397k-ihiz_gpcr" _uuid="00000000-0000-0000-36AE-BF0D18361297" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-397k-ihiz_gpcr"><intent_id>1072023</intent_id><project_id>876655</project_id><text_data>project # 107952SEA</text_data><comment_date>2020-07-14T00:00:00</comment_date></row><row _id="row-s4mb~fx2n.zxrb" _uuid="00000000-0000-0000-096F-AAFA45EAD401" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4mb~fx2n.zxrb"><intent_id>941485</intent_id><project_id>860630</project_id><text_data>Project is exempt from State Prevailing Wage Rates based on the Housing Act of 1937 &amp; 24 CFR 965.101. All workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2018-11-02T00:00:00</comment_date></row><row _id="row-gcih.nsu4-euep" _uuid="00000000-0000-0000-5A49-C343455C4A08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcih.nsu4-euep"><intent_id>702927</intent_id><project_id>765560</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2015-06-23T00:00:00</comment_date></row><row _id="row-p9qx.syhb_jheg" _uuid="00000000-0000-0000-731C-5589840BE30B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p9qx.syhb_jheg"><intent_id>962191</intent_id><project_id>874139</project_id><text_data>1.  Install (2) Mitsubishi ductless heat pump systems2.  No3.  14. Offices    a. yes   b. not   c. no   d. no   e. no   f. no   g. no   h. no   i. no    j. no   k. no   l. no5. no6. yes7. no8. no</text_data><comment_date>2019-02-26T00:00:00</comment_date></row><row _id="row-ff5k.y6hx_7bge" _uuid="00000000-0000-0000-AF34-E56C25D5E185" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ff5k.y6hx_7bge"><intent_id>714595</intent_id><project_id>770012</project_id><text_data>Abbey Party Rents will deliver the rental equipment ordered by the Port of Seattle in an Abbey Party Rents truck. The crew will unload the equipment and will erect the canopies. The crew will use hand trucks, carts, leatherman tools. All other equipment will be left near or under the canopies but will not be set up.</text_data><comment_date>2015-08-14T00:00:00</comment_date></row><row _id="row-24ng_zbas.q3vj" _uuid="00000000-0000-0000-E16F-E711A5E507B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-24ng_zbas.q3vj"><intent_id>956296</intent_id><project_id>871311</project_id><comment_date>2019-01-22T00:00:00</comment_date></row><row _id="row-8jnb_k9a8-pcpq" _uuid="00000000-0000-0000-F660-66F92AF24422" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8jnb_k9a8-pcpq"><intent_id>475373</intent_id><project_id>673424</project_id><text_data>SURREY LANE APTS BLDG #9SURREY LANE APTS BLDG #10SURREY LANE APTS BLDG #112810 RUDDELL RD SELACEY WA 98503</text_data><comment_date>2011-08-30T00:00:00</comment_date></row><row _id="row-bbyz_z8s8~fwis" _uuid="00000000-0000-0000-0EBE-21C5E7476F63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bbyz_z8s8~fwis"><intent_id>1056302</intent_id><project_id>816267</project_id><text_data>Redoing intent # 866129 with the correct hiring contractor</text_data><comment_date>2020-05-06T00:00:00</comment_date></row><row _id="row-qebj-xnvh_m8u9" _uuid="00000000-0000-0000-637C-7767D8697645" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qebj-xnvh_m8u9"><intent_id>1286999</intent_id><project_id>1001953</project_id><text_data>Truck Driver Other:  Totor style truck to deliver mobile office spaceNorthshore Exteriors RO026873</text_data><comment_date>2022-12-01T00:00:00</comment_date></row><row _id="row-ecrs~8jm6_bdd5" _uuid="00000000-0000-0000-3782-D09C5A31011E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ecrs~8jm6_bdd5"><intent_id>844172</intent_id><project_id>824416</project_id><text_data>Job # 16283</text_data><comment_date>2017-06-29T00:00:00</comment_date></row><row _id="row-9w86.45gg~kkp8" _uuid="00000000-0000-0000-1B27-31021C85ACF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9w86.45gg~kkp8"><intent_id>1228287</intent_id><project_id>1006037</project_id><text_data>21891-0025F SPRINKS</text_data><comment_date>2022-04-25T00:00:00</comment_date></row><row _id="row-xcpv-k2tx~cg59" _uuid="00000000-0000-0000-BA56-E51340A84C94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xcpv-k2tx~cg59"><intent_id>994710</intent_id><project_id>883147</project_id><text_data>Install owner provided 60 mil HDPE GeomembraneEquipment:generator, wedges/mice, extrusion welders, air compressors, V Box, tensiometer, misc geotextile speciality tools.</text_data><comment_date>2019-07-25T00:00:00</comment_date></row><row _id="row-pn9u-5wjd.fwrs" _uuid="00000000-0000-0000-97B2-EEBCA5C07318" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pn9u-5wjd.fwrs"><intent_id>516973</intent_id><project_id>689459</project_id><text_data>The General will be building a new Substation for the PUD, it is bare ground now.When they are finished Mountain View Irrigation will install an irrigation system and plants, Decorative rocks, bark, weed fabric, plastic landscape edging. The employees will use wheel barrows, shovels, hack saws, glue, rakes, rollers, hammers.When they are finishedEnter new notes  Cancel 	Back to Previous Step 		&amp;#169; Washington State Dept. of Labor &amp; Industries. Use of this site is subject to the laws of the state of Washington.    Access Agreement    Privacy &amp; Security Statement    Intended Use/External Content Policy    Staff OnlyInformation</text_data><comment_date>2012-06-19T00:00:00</comment_date></row><row _id="row-uvtd.wswf.e8x9" _uuid="00000000-0000-0000-CCC7-102BC19C207E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uvtd.wswf.e8x9"><intent_id>587533</intent_id><project_id>717702</project_id><text_data>Clean pavement seal from surrounding catchbasinsLaborers to keep area clean of all debris using brooms, shovels and/or small hand toolsVactor Guzzler to vacuum all spilled material from catch basins</text_data><comment_date>2013-08-14T00:00:00</comment_date></row><row _id="row-drqp~brnn_ccau" _uuid="00000000-0000-0000-AD21-7D56893068DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-drqp~brnn_ccau"><intent_id>670928</intent_id><project_id>751294</project_id><text_data>A) The project scope is the demolition of a 4 story dormitory building for WSU. The site of the demolished building is to be replanted with various plants. B) We plan to subcontract the demolition work along with the electrical and abatement work. We may self-perform or subcontract the landscaping work.</text_data><comment_date>2014-12-23T00:00:00</comment_date></row><row _id="row-6xwa.jb32-9x4v" _uuid="00000000-0000-0000-35C7-4EA1296357E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xwa.jb32-9x4v"><intent_id>502352</intent_id><project_id>681838</project_id><text_data>1302 pleasant aveyakima,wa 98902</text_data><comment_date>2012-03-01T00:00:00</comment_date></row><row _id="row-efmg-2svw~8aqx" _uuid="00000000-0000-0000-F666-48662ECEAD4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efmg-2svw~8aqx"><intent_id>546425</intent_id><project_id>700535</project_id><text_data>Form filed by: Byron T Nelson</text_data><comment_date>2012-11-29T00:00:00</comment_date></row><row _id="row-d3gu.ciqz~xpp6" _uuid="00000000-0000-0000-0405-0E8A7813A539" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d3gu.ciqz~xpp6"><intent_id>929352</intent_id><project_id>850608</project_id><text_data>RON RHOADS IS AN OWNER/OPERATOR.FRINGE BENEFITS ARE PAID IN FULL DIRECTLY TO EMPLOYEE.</text_data><comment_date>2018-08-29T00:00:00</comment_date></row><row _id="row-jgtx-pegs.a3ta" _uuid="00000000-0000-0000-432D-22E6FF4CF0DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgtx-pegs.a3ta"><intent_id>507393</intent_id><project_id>685370</project_id><text_data>Other Truck will be moving equipment with a lowboy or truck and tilt top</text_data><comment_date>2012-04-11T00:00:00</comment_date></row><row _id="row-a6jb-csyb~wqz6" _uuid="00000000-0000-0000-1F11-293AA48AF478" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a6jb-csyb~wqz6"><intent_id>542527</intent_id><project_id>698893</project_id><text_data>fringes:$4.30 per hr - health benefits - Healthnet of Oregon$3.00 per hr - retirement (401k) - Spectrum Pension Consultants Inc$.50 per hr - Apprenticeship - NW College of Construction - Construction Industry Training Trust$.50 to $1.50 per hr - vacation - depending on how many days each employee is eligible forany remaining amount is then either deposited in the employees' 401k retirement account or the Supplement Unemployment Benefit Program per their choice.</text_data><comment_date>2012-11-13T00:00:00</comment_date></row><row _id="row-87e9~4qdw~ghfs" _uuid="00000000-0000-0000-C14B-96AFC37F4F5B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87e9~4qdw~ghfs"><intent_id>900036</intent_id><project_id>842983</project_id><text_data>Install rock wall manually. No tolls used. Any heavy machinery needed will be operated by owner only</text_data><comment_date>2018-04-22T00:00:00</comment_date></row><row _id="row-gbz9.58jc_zx5u" _uuid="00000000-0000-0000-AFD1-A7164348AF03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbz9.58jc_zx5u"><intent_id>759534</intent_id><project_id>790855</project_id><text_data>Job # 8012325</text_data><comment_date>2016-05-02T00:00:00</comment_date></row><row _id="row-93w7-saka_xbmc" _uuid="00000000-0000-0000-688F-47F73F9185A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-93w7-saka_xbmc"><intent_id>1181881</intent_id><project_id>981605</project_id><text_data>We are installing playground chips into designated play areas. The owner will be performing the installation, while laborers perform cleanup with a leaf blower which falls under the landscape beautification classification. Laborers will be paid the published rate for Groundskeeper under Landscape Maintenance.</text_data><comment_date>2021-09-29T00:00:00</comment_date></row><row _id="row-vjw6-uhdw.3mqt" _uuid="00000000-0000-0000-0DCD-EF9BC767BD5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vjw6-uhdw.3mqt"><intent_id>663028</intent_id><project_id>743144</project_id><text_data>pull in Cat 6 cable - Indoors - wifi bits &amp; bytes internet cable</text_data><comment_date>2014-10-31T00:00:00</comment_date></row><row _id="row-rirw.q3r7_79im" _uuid="00000000-0000-0000-50DE-5E81FB845709" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rirw.q3r7_79im"><intent_id>702772</intent_id><project_id>765666</project_id><text_data>All work performed indoors. Cabling provided for telephones and computers.</text_data><comment_date>2015-06-23T00:00:00</comment_date></row><row _id="row-3uaz-y8d8_nra9" _uuid="00000000-0000-0000-D11F-680C515D4A53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3uaz-y8d8_nra9"><intent_id>623480</intent_id><project_id>731090</project_id><text_data>Fringe Breakdown:$14.44---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $7.44 Pension$17.69---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $10.69 Pension</text_data><comment_date>2014-04-04T00:00:00</comment_date></row><row _id="row-yjcy_kfac-qhbw" _uuid="00000000-0000-0000-5E68-2BD118306532" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yjcy_kfac-qhbw"><intent_id>1187746</intent_id><project_id>984887</project_id><text_data>Moon Job # 54-100806</text_data><comment_date>2021-10-22T00:00:00</comment_date></row><row _id="row-hspk~jmvq_7uq2" _uuid="00000000-0000-0000-28AC-8206FE910127" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hspk~jmvq_7uq2"><intent_id>747752</intent_id><project_id>785577</project_id><text_data>16-F004</text_data><comment_date>2016-02-22T00:00:00</comment_date></row><row _id="row-idv9.kyf2-f5bj" _uuid="00000000-0000-0000-036B-787A9CE1F93E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-idv9.kyf2-f5bj"><intent_id>679220</intent_id><project_id>739344</project_id><text_data>ON 7/30/2014Interior renovation of existing 4 level apartment building. No commercial, retail or public use in building. No rehab, transitional, communal dining, treatment, dorms or counseling in building. Each unit rented separately for permanent residence with own kitchen &amp; bath. Manager&amp;#39;s office on site.  Our scope of work is installing new downspout system to building.</text_data><comment_date>2015-02-13T00:00:00</comment_date></row><row _id="row-vn2n.wcsn~uex2" _uuid="00000000-0000-0000-B62D-9B9B59F3DBBC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vn2n.wcsn~uex2"><intent_id>597723</intent_id><project_id>721411</project_id><text_data>$15.90 comprised of Health &amp; Security $7.55+Pension $7.65+Apprenticeship Trianing/Retraining $.70 = $15.90</text_data><comment_date>2013-10-08T00:00:00</comment_date></row><row _id="row-6qbi_g7zt~i9je" _uuid="00000000-0000-0000-4A59-2BC9B18AAA4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6qbi_g7zt~i9je"><intent_id>1162294</intent_id><project_id>971680</project_id><text_data>9871843</text_data><comment_date>2021-07-21T00:00:00</comment_date></row><row _id="row-d6zp_q2wm_ap9f" _uuid="00000000-0000-0000-1A5C-4DE41373540B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d6zp_q2wm_ap9f"><intent_id>595523</intent_id><project_id>715194</project_id><text_data>Working on the Maxxess System &amp;quot;Access Control System&amp;quot;, door access.</text_data><comment_date>2013-09-26T00:00:00</comment_date></row><row _id="row-zvxr_6aau.7ejg" _uuid="00000000-0000-0000-8990-A0542FF116A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zvxr_6aau.7ejg"><intent_id>1084267</intent_id><project_id>930894</project_id><text_data>WO #393597 $6085.04</text_data><comment_date>2020-08-28T00:00:00</comment_date></row><row _id="row-f8ez_y3qb.9ib8" _uuid="00000000-0000-0000-3CD0-309874B3344E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f8ez_y3qb.9ib8"><intent_id>549543</intent_id><project_id>701952</project_id><text_data>Form filed by: Rob Salopek</text_data><comment_date>2012-12-21T00:00:00</comment_date></row><row _id="row-mna6.wna4-xjbj" _uuid="00000000-0000-0000-3564-99C5B2E8656E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mna6.wna4-xjbj"><intent_id>493764</intent_id><project_id>680039</project_id><text_data>#1) YES, #2) VARIES 1-2, #3) A-YES B-G NO, #4) YES, #5) YES, #6) NO, #7) NO</text_data><comment_date>2011-12-16T00:00:00</comment_date></row><row _id="row-wku8.saqm~qndm" _uuid="00000000-0000-0000-9010-222FC9919496" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wku8.saqm~qndm"><intent_id>746365</intent_id><project_id>784930</project_id><text_data>Replaced the compressor, filter drier and expansion valve</text_data><comment_date>2016-02-11T00:00:00</comment_date></row><row _id="row-6qve.78kt_vtvj" _uuid="00000000-0000-0000-4FEF-37B9ED6F254A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6qve.78kt_vtvj"><intent_id>875974</intent_id><project_id>833818</project_id><text_data>run cable for IP Clock System inside building</text_data><comment_date>2017-11-21T00:00:00</comment_date></row><row _id="row-e76a_ukac_39gd" _uuid="00000000-0000-0000-05C6-F65B12238DF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e76a_ukac_39gd"><intent_id>1179946</intent_id><project_id>975054</project_id><text_data>Our scope of work includes soil prepping, planting and mulchingFringe BreakdownHealth 6.5Pension 4.54</text_data><comment_date>2021-09-22T00:00:00</comment_date></row><row _id="row-bs5b~pbvm~se3s" _uuid="00000000-0000-0000-C5D1-892CBC1FD9DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bs5b~pbvm~se3s"><intent_id>986473</intent_id><project_id>881043</project_id><text_data>General labor work consists of hand work (shovel work) no power equipment or power tools. Blade operator is used for grading the project site for compaction before paving operations. Other trucks consist of one (1) 0-8,000 gallon water truck used for water distribution during the grading process to help with compaction.</text_data><comment_date>2019-06-20T00:00:00</comment_date></row><row _id="row-a2kv~cbfd~rpqz" _uuid="00000000-0000-0000-5D27-976424CBDEE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a2kv~cbfd~rpqz"><intent_id>961299</intent_id><project_id>873741</project_id><text_data>Filed by Victoria C Mills</text_data><comment_date>2019-02-21T00:00:00</comment_date></row><row _id="row-q7fy~3sad-99x3" _uuid="00000000-0000-0000-0790-4FE849031CE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q7fy~3sad-99x3"><intent_id>1090889</intent_id><project_id>920984</project_id><text_data>1120128</text_data><comment_date>2020-09-24T00:00:00</comment_date></row><row _id="row-gcnf.gbqh~pvt2" _uuid="00000000-0000-0000-CA49-109488F5E8F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcnf.gbqh~pvt2"><intent_id>871374</intent_id><project_id>796081</project_id><text_data>Telecommunications wi-fi cablingall work will be done indoors</text_data><comment_date>2017-10-26T00:00:00</comment_date></row><row _id="row-2ix9_bht2-92nn" _uuid="00000000-0000-0000-4986-627E24F35720" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ix9_bht2-92nn"><intent_id>1008015</intent_id><project_id>893607</project_id><text_data>STEPHANIE RANKIN-LATHAN865 STATE RT. 4NASELLE WA   98638JOB #1976559 - CLIENT #1920</text_data><comment_date>2019-09-18T00:00:00</comment_date></row><row _id="row-iaaq.sxjs.9wkm" _uuid="00000000-0000-0000-B713-9D9F78FA9B5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iaaq.sxjs.9wkm"><intent_id>505884</intent_id><project_id>685123</project_id><text_data>Form filed by: Brian Bruce - murq235</text_data><comment_date>2012-03-29T00:00:00</comment_date></row><row _id="row-e8t7.vhze-emp7" _uuid="00000000-0000-0000-7DD9-7153FCE39B37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e8t7.vhze-emp7"><intent_id>625204</intent_id><project_id>733110</project_id><text_data>Fire Clean up at Lake Grove Elementary due to Toilet paper caught on Fire.  We cleaned up the structure and set Air Scrubber and Odor Counteract ant.</text_data><comment_date>2014-05-01T00:00:00</comment_date></row><row _id="row-bg5g~yktu~bnsk" _uuid="00000000-0000-0000-AFA4-7866C197BC6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bg5g~yktu~bnsk"><intent_id>1241700</intent_id><project_id>1017854</project_id><text_data>Job#22116</text_data><comment_date>2022-06-16T00:00:00</comment_date></row><row _id="row-gu4b_5i9n_r657" _uuid="00000000-0000-0000-A7BF-91051E2208F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gu4b_5i9n_r657"><intent_id>518248</intent_id><project_id>689988</project_id><text_data>Surface running tracks</text_data><comment_date>2012-06-21T00:00:00</comment_date></row><row _id="row-y7nz~muf8-cb5z" _uuid="00000000-0000-0000-8A45-0BFE8B013A45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y7nz~muf8-cb5z"><intent_id>940428</intent_id><project_id>823535</project_id><text_data>GU Job #18316</text_data><comment_date>2018-10-17T00:00:00</comment_date></row><row _id="row-kucn_tdf5~ppa8" _uuid="00000000-0000-0000-4C06-1A12858C9253" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kucn_tdf5~ppa8"><intent_id>554213</intent_id><project_id>703987</project_id><text_data>David Wu is a residential apartment complex that has 16 units. Each unit has a kitchen and at least one bathroom and is considered a permanent primary residence for all its residents. The building is no more than two stories in height. The laborers will be replacing light bulbs and the plumber will be replacing showerheads and earators. This job meets the residential job requirements.</text_data><comment_date>2013-01-31T00:00:00</comment_date></row><row _id="row-8frr.grir-8ajn" _uuid="00000000-0000-0000-2FD8-D45A4B236691" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8frr.grir-8ajn"><intent_id>674743</intent_id><project_id>753654</project_id><text_data>ALLIED&amp;#39;S JOB # 150113-0036.419</text_data><comment_date>2015-01-15T00:00:00</comment_date></row><row _id="row-yi3q-6xd9-m6pb" _uuid="00000000-0000-0000-CF40-CFE1D0C66B04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yi3q-6xd9-m6pb"><intent_id>1207761</intent_id><project_id>997155</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. BCI Project No. GA2060</text_data><comment_date>2022-01-28T00:00:00</comment_date></row><row _id="row-55yj-89zy_ie3t" _uuid="00000000-0000-0000-9B81-CB9A8224BBEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-55yj-89zy_ie3t"><intent_id>1233000</intent_id><project_id>1012065</project_id><text_data>S032038</text_data><comment_date>2022-05-12T00:00:00</comment_date></row><row _id="row-fmxe.eipr_quay" _uuid="00000000-0000-0000-A42B-BB072551F4BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fmxe.eipr_quay"><intent_id>624920</intent_id><project_id>733001</project_id><text_data>Form filed by: Breanne McIntyreProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2014-04-15T00:00:00</comment_date></row><row _id="row-spjk-u8tk-qbws" _uuid="00000000-0000-0000-4AAC-C58689BCAACC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-spjk-u8tk-qbws"><intent_id>742751</intent_id><project_id>783196</project_id><text_data>provided and installed approx. 600 ft of 12 stand OM3osp fiber optic cable</text_data><comment_date>2016-01-21T00:00:00</comment_date></row><row _id="row-56dh.6kpb-c2j5" _uuid="00000000-0000-0000-A5F7-D01DE4EAF7B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-56dh.6kpb-c2j5"><intent_id>956388</intent_id><project_id>857853</project_id><text_data>Installation of underground irrigation system with sprinklers and a controller.</text_data><comment_date>2019-01-22T00:00:00</comment_date></row><row _id="row-j9iu.r9bs-dxd3" _uuid="00000000-0000-0000-D590-808A9764B114" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j9iu.r9bs-dxd3"><intent_id>969103</intent_id><project_id>877357</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install horizontal cable for voice / data communications. Terminate cables in the equipment room.</text_data><comment_date>2019-04-02T00:00:00</comment_date></row><row _id="row-4me7_hh2q-nbbj" _uuid="00000000-0000-0000-A12C-D0B70C4DE031" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4me7_hh2q-nbbj"><intent_id>945435</intent_id><project_id>866328</project_id><text_data>TITAN 1839Small Works PO#1207098</text_data><comment_date>2018-11-13T00:00:00</comment_date></row><row _id="row-sebc_6cgm_x8vc" _uuid="00000000-0000-0000-DAC2-758F9339C397" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sebc_6cgm_x8vc"><intent_id>618354</intent_id><project_id>730068</project_id><text_data>Ingalls - 903 Paiute Pl La Conner WA 98257</text_data><comment_date>2014-03-03T00:00:00</comment_date></row><row _id="row-r4ee.pewm.j3ib" _uuid="00000000-0000-0000-B50D-6807517A432D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r4ee.pewm.j3ib"><intent_id>569417</intent_id><project_id>710926</project_id><text_data>Private Residence, weatherization repairs.</text_data><comment_date>2013-05-13T00:00:00</comment_date></row><row _id="row-kp6v-w893-vxdj" _uuid="00000000-0000-0000-6A9F-30324D375137" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kp6v-w893-vxdj"><intent_id>664910</intent_id><project_id>748502</project_id><text_data>BID#1173 PC 6</text_data><comment_date>2014-11-10T00:00:00</comment_date></row><row _id="row-trwk.xf24_tafu" _uuid="00000000-0000-0000-E3A7-0891BFBE685E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-trwk.xf24_tafu"><intent_id>498884</intent_id><project_id>682132</project_id><text_data>Form filed by: John Mulliner</text_data><comment_date>2012-02-01T00:00:00</comment_date></row><row _id="row-wfkw-3j7b~u4zh" _uuid="00000000-0000-0000-BE79-8BFEB0596F35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wfkw-3j7b~u4zh"><intent_id>589850</intent_id><project_id>712397</project_id><text_data>Form filed by: Donna L Marie</text_data><comment_date>2013-08-26T00:00:00</comment_date></row><row _id="row-g9aq~mi9e-ykmt" _uuid="00000000-0000-0000-3563-FA51C91012C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g9aq~mi9e-ykmt"><intent_id>786523</intent_id><project_id>789344</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborers Union)Other Trucks: Lowbed - Mobilization of equipment(Teamsters Union)</text_data><comment_date>2016-08-31T00:00:00</comment_date></row><row _id="row-rjkx-pvsr.nn6q" _uuid="00000000-0000-0000-53F9-FD78812319B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rjkx-pvsr.nn6q"><intent_id>795094</intent_id><project_id>802909</project_id><text_data>Track Repairs</text_data><comment_date>2016-10-11T00:00:00</comment_date></row><row _id="row-kg42-8p8h_azf6" _uuid="00000000-0000-0000-42C4-8D364764BCF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kg42-8p8h_azf6"><intent_id>687018</intent_id><project_id>759077</project_id><text_data>This contract is for the maintenance of Port of Kennewick property.  Services provided include regular mowing and trimming of grasses, pruning of bushes or shrubbery and general plant care and maintenance for the property. Also included is irrigation system maintenance and repair, including the repair and/or replacement of existing lines, valves, and sprinklers.</text_data><comment_date>2015-04-02T00:00:00</comment_date></row><row _id="row-9qpm~gsq8_cppv" _uuid="00000000-0000-0000-FD59-199844D2E83C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9qpm~gsq8_cppv"><intent_id>1274449</intent_id><project_id>1034265</project_id><text_data>Everett</text_data><comment_date>2022-10-13T00:00:00</comment_date></row><row _id="row-uyq3~eg6k.439k" _uuid="00000000-0000-0000-104D-B2C604056BFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uyq3~eg6k.439k"><intent_id>1137901</intent_id><project_id>959293</project_id><text_data>120501-001</text_data><comment_date>2021-04-22T00:00:00</comment_date></row><row _id="row-7dwx.xbza~tqdh" _uuid="00000000-0000-0000-F5D4-0469069AF56C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7dwx.xbza~tqdh"><intent_id>754452</intent_id><project_id>760053</project_id><text_data>Filed by Scott VanAusdalProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon Wage requirements for the following Crafts/trades/occupations.</text_data><comment_date>2016-04-01T00:00:00</comment_date></row><row _id="row-ys32.qg5j~6rhf" _uuid="00000000-0000-0000-63CB-A81FF0A31970" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ys32.qg5j~6rhf"><intent_id>605886</intent_id><project_id>724489</project_id><text_data>This is a revision on prior filed intent 577984, in order to enter time worked for our employees.</text_data><comment_date>2013-11-22T00:00:00</comment_date></row><row _id="row-mnep.6kg4_9pwe" _uuid="00000000-0000-0000-7C48-7319CAC97A3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mnep.6kg4_9pwe"><intent_id>1188440</intent_id><project_id>985310</project_id><text_data>Grub and clear existing shrubs and top dress with 5/8ths minus rock in disturbed area 2' to 3'.  Use of Ditchwitch 850 track machine (Less than 92 HP)</text_data><comment_date>2021-10-26T00:00:00</comment_date></row><row _id="row-fbdc-we8t~cpgm" _uuid="00000000-0000-0000-F9BD-FE7C692A34C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fbdc-we8t~cpgm"><intent_id>1137363</intent_id><project_id>959009</project_id><text_data>3/1/2021 - From Tech. Replace 2 inch pipe on dry system in soffit tired tired in 2-1 1/4mechanical T four heads in the soffit system back into service</text_data><comment_date>2021-04-20T00:00:00</comment_date></row><row _id="row-pbwy~kp36~pfjb" _uuid="00000000-0000-0000-560D-5656D4AB2609" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbwy~kp36~pfjb"><intent_id>479340</intent_id><project_id>674858</project_id><text_data>No improvements made.  Only tree trimming, removals and stump grind.  Not under power-lines.</text_data><comment_date>2011-09-21T00:00:00</comment_date></row><row _id="row-v2d7-fug8_qx7r" _uuid="00000000-0000-0000-A571-527F2EFCF56A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v2d7-fug8_qx7r"><intent_id>1144101</intent_id><project_id>962076</project_id><text_data>R21-006</text_data><comment_date>2021-05-12T00:00:00</comment_date></row><row _id="row-bz4m_vu5s.qezc" _uuid="00000000-0000-0000-8D8C-913EE39EE148" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bz4m_vu5s.qezc"><intent_id>922356</intent_id><project_id>857234</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER</text_data><comment_date>2018-08-01T00:00:00</comment_date></row><row _id="row-dqhf-ij9z_x9m5" _uuid="00000000-0000-0000-26C0-B2DD5975AC36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dqhf-ij9z_x9m5"><intent_id>1417649</intent_id><project_id>1119280</project_id><comment_date>2024-04-09T00:00:00</comment_date></row><row _id="row-zdkr_yr25-rpgc" _uuid="00000000-0000-0000-ADF9-EBA0BD7D9400" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdkr_yr25-rpgc"><intent_id>458142</intent_id><project_id>667028</project_id><text_data>Truck Driver/Other Trucks:  Water truck is used for application of water to soil for dust control and compaction.</text_data><comment_date>2011-06-13T00:00:00</comment_date></row><row _id="row-rr8h~wsqk-q7v2" _uuid="00000000-0000-0000-9BE9-27D23DF111A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rr8h~wsqk-q7v2"><intent_id>541554</intent_id><project_id>697832</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-30T00:00:00</comment_date></row><row _id="row-cauw_hfwr-n7db" _uuid="00000000-0000-0000-07B5-574C471DBF5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cauw_hfwr-n7db"><intent_id>476528</intent_id><project_id>673876</project_id><text_data>Peppertree Apts is a residential apartment complex that has 30 units, each unit has a kitchen and at least one bathroom and is no more that two stories in height. The residential consider this their permanent primary residence. The electricians will be replacing like and king light fixtures, and the residential sheet metal workers will be doing venting. This job meets the residential job requirements.</text_data><comment_date>2011-09-07T00:00:00</comment_date></row><row _id="row-5i6q.9atp_kwwm" _uuid="00000000-0000-0000-0FF7-1DAB9E3E2F17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5i6q.9atp_kwwm"><intent_id>1018585</intent_id><project_id>889590</project_id><comment_date>2019-10-30T00:00:00</comment_date></row><row _id="row-k8k6_kfiv-a36s" _uuid="00000000-0000-0000-8A46-585917BD0132" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k8k6_kfiv-a36s"><intent_id>1173102</intent_id><project_id>977051</project_id><text_data>WO #420674</text_data><comment_date>2021-08-27T00:00:00</comment_date></row><row _id="row-qwdy-beup-a4yd" _uuid="00000000-0000-0000-A23C-93BE1F94FAE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qwdy-beup-a4yd"><intent_id>1097653</intent_id><project_id>937128</project_id><text_data>Service Call 51965 Invoice 7345</text_data><comment_date>2020-10-21T00:00:00</comment_date></row><row _id="row-2htf_p88k_gzww" _uuid="00000000-0000-0000-4B59-EFC91385C24E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2htf_p88k_gzww"><intent_id>698556</intent_id><project_id>663660</project_id><text_data>Form filed by:  Kassa Amare</text_data><comment_date>2015-06-04T00:00:00</comment_date></row><row _id="row-hzer~ya3i-n2w5" _uuid="00000000-0000-0000-3DD5-8282E7C97B4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hzer~ya3i-n2w5"><intent_id>573339</intent_id><project_id>712503</project_id><text_data>Response from Michael Hummel to Correction for Question No. 5 - Received by email 07/17/2013:  5.  What specific tasks did your employees perform?  Siemens� SES Technicians, perform their work strictly on laptop computers, both remotely and on-site during the commissioning process.  While off-site, the SES Technicians update program configurations and point inputs.  The SES Technician typically sits in at control panel and manipulates the system using a computer program.  The program itself informs the Technician whether various components are functioning properly as they are triggered.  If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified.  After confirming that the system is operating properly, the SES Technician trains the end-user about system functionality, again using a computer interface.  Importantly, SES Technicians do not use trade tools, such as drills or wrenches.</text_data><comment_date>2013-07-25T00:00:00</comment_date></row><row _id="row-xf5b_r8sb~3fyk" _uuid="00000000-0000-0000-9E34-3D9A10AF1880" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xf5b_r8sb~3fyk"><intent_id>889314</intent_id><project_id>842945</project_id><text_data>Fringe Breakdown:Annuity $6.55Health &amp; Welfare $7.52Pension $10.45Impact $.25Apprenticeship $.69Industry $.01Paid Time Off $1.90Total $27.37</text_data><comment_date>2018-02-21T00:00:00</comment_date></row><row _id="row-68fd_xvj7-756t" _uuid="00000000-0000-0000-D63F-C17B3B6964FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-68fd_xvj7-756t"><intent_id>1204414</intent_id><project_id>995058</project_id><text_data>9886109</text_data><comment_date>2022-01-13T00:00:00</comment_date></row><row _id="row-tm85.igqi_hen3" _uuid="00000000-0000-0000-7C22-37195DDF4F10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tm85.igqi_hen3"><intent_id>1243029</intent_id><project_id>1013649</project_id><text_data>Some of the tools that will be used are, shovels, brooms, masking tape, wheel barrows, measuring Tapes, Levels, and other safety equipment to keep the children, workers and public safe.</text_data><comment_date>2022-06-21T00:00:00</comment_date></row><row _id="row-a48t_f793-dpi2" _uuid="00000000-0000-0000-5E27-F022B5DA9436" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a48t_f793-dpi2"><intent_id>737220</intent_id><project_id>780579</project_id><text_data>Approval of this form does not signify approval of the classifications of labor listed on the form. The basis for approval is the criteria that the prevailing rate of wage/benefits listed equals or exceeds the amount published for the classification of labor listed.</text_data><comment_date>2015-12-15T00:00:00</comment_date></row><row _id="row-xfmf_8x6h.z7f4" _uuid="00000000-0000-0000-9EE1-68F94530427E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xfmf_8x6h.z7f4"><intent_id>644979</intent_id><project_id>739369</project_id><text_data>Oregon Workman's Compensation SAIF Policy #812940</text_data><comment_date>2014-07-31T00:00:00</comment_date></row><row _id="row-f2qh_w6c4~v6vi" _uuid="00000000-0000-0000-4F2D-66B8D55ECB29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f2qh_w6c4~v6vi"><intent_id>1274435</intent_id><project_id>1035214</project_id><text_data>This intent is to replace intent #1258122.  Had the incorrect contract #.</text_data><comment_date>2022-10-12T00:00:00</comment_date></row><row _id="row-t9a2_ytay~ciqk" _uuid="00000000-0000-0000-7495-0574DDBC37CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9a2_ytay~ciqk"><intent_id>791257</intent_id><project_id>803203</project_id><text_data>Other Trucks: Lowboy</text_data><comment_date>2016-09-28T00:00:00</comment_date></row><row _id="row-t2mk~nb92-8z62" _uuid="00000000-0000-0000-5C88-E99CAD501A96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t2mk~nb92-8z62"><intent_id>1146321</intent_id><project_id>963264</project_id><text_data>**General labor consists of site protection, cleanup and help move material**</text_data><comment_date>2021-05-20T00:00:00</comment_date></row><row _id="row-keyr.euai~r97m" _uuid="00000000-0000-0000-273C-0FBB2A901CC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-keyr.euai~r97m"><intent_id>1162697</intent_id><project_id>903522</project_id><text_data>Project is renovation of a school.  We will provide hydroseeding of lawn areas using a 75hp Bowie Hydroseeder,</text_data><comment_date>2021-07-22T00:00:00</comment_date></row><row _id="row-qsjj~3nqu~kjws" _uuid="00000000-0000-0000-E94C-3E84EFF67663" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qsjj~3nqu~kjws"><intent_id>1267297</intent_id><project_id>1031436</project_id><text_data>S032464</text_data><comment_date>2022-09-16T00:00:00</comment_date></row><row _id="row-8v2c~d6gn.spm7" _uuid="00000000-0000-0000-E283-0B10465A08F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8v2c~d6gn.spm7"><intent_id>1260419</intent_id><project_id>1027728</project_id><text_data>&amp;lt;8000 gal water truck is used for dust control or compaction</text_data><comment_date>2022-09-06T00:00:00</comment_date></row><row _id="row-57n3.bz4b_ez8p" _uuid="00000000-0000-0000-A937-1F824984B696" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-57n3.bz4b_ez8p"><intent_id>658255</intent_id><project_id>744798</project_id><text_data>other truck = lowboy to transport equipment</text_data><comment_date>2014-10-02T00:00:00</comment_date></row><row _id="row-6bt9~qwky_vf2i" _uuid="00000000-0000-0000-5174-2270EB9F27BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6bt9~qwky_vf2i"><intent_id>1033864</intent_id><project_id>905794</project_id><text_data>Work to be done off hours to avoid instruction interference</text_data><comment_date>2020-01-25T00:00:00</comment_date></row><row _id="row-7ihn.pdpa_d7c4" _uuid="00000000-0000-0000-EF0A-FE7925D0EE88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ihn.pdpa_d7c4"><intent_id>1008780</intent_id><project_id>893906</project_id><text_data>HYDROSEEDING</text_data><comment_date>2019-09-20T00:00:00</comment_date></row><row _id="row-t7i9-ytnm-db6c" _uuid="00000000-0000-0000-4A9C-307AA6791984" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t7i9-ytnm-db6c"><intent_id>554143</intent_id><project_id>696129</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-02-04T00:00:00</comment_date></row><row _id="row-t5id.5i27.ejke" _uuid="00000000-0000-0000-F96C-2ADEC8EBB5EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t5id.5i27.ejke"><intent_id>1033236</intent_id><project_id>902976</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2020-01-22T00:00:00</comment_date></row><row _id="row-mnx5.akjm.6fsd" _uuid="00000000-0000-0000-780F-5B98AEE3A797" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mnx5.akjm.6fsd"><intent_id>944425</intent_id><project_id>854000</project_id><text_data>Pathways/trails are being created by another subcontractor - we are just topping the pathways with footing ie. gravel and/or stone.</text_data><comment_date>2018-12-03T00:00:00</comment_date></row><row _id="row-jbr8-wua6_ffif" _uuid="00000000-0000-0000-B8C1-2ACF27551BF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jbr8-wua6_ffif"><intent_id>681074</intent_id><project_id>753714</project_id><text_data>Filed by Gary A. Wright</text_data><comment_date>2015-02-26T00:00:00</comment_date></row><row _id="row-esxc~athi-3zn7" _uuid="00000000-0000-0000-E6A8-19E9F1916D23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-esxc~athi-3zn7"><intent_id>1069492</intent_id><project_id>923706</project_id><text_data>2020 WWTP &amp; Lift Station Generator Repairs</text_data><comment_date>2020-07-01T00:00:00</comment_date></row><row _id="row-wk5v_7ffs~daxy" _uuid="00000000-0000-0000-8FF7-4D0EFA197638" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wk5v_7ffs~daxy"><intent_id>911845</intent_id><project_id>848799</project_id><text_data>(1000439)install door packages  and composite cables</text_data><comment_date>2018-06-18T00:00:00</comment_date></row><row _id="row-gr4n~vvay~aujj" _uuid="00000000-0000-0000-8F1F-C737E81FCB02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gr4n~vvay~aujj"><intent_id>743360</intent_id><project_id>776353</project_id><text_data>064024</text_data><comment_date>2016-01-25T00:00:00</comment_date></row><row _id="row-cxks.c63t~7asu" _uuid="00000000-0000-0000-3EC0-E92FD23DF0AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxks.c63t~7asu"><intent_id>923984</intent_id><project_id>858015</project_id><text_data>PROJECT IS EXEMPT FROM STATE PREVAILING WAGE REQUIREMENTS BASED IN THE HOUSING ACT OF 1937 AND 24 CFR 965,101. WORKERS WILL BE PAID IN ACCORDANCE WITH DAVIS-BACON WAGE REQUIREMENTS FOR THE FOLLOWING CRAFTS/TRADES/OCCUPATIONS: SOFT FLOOR LAYER</text_data><comment_date>2018-08-08T00:00:00</comment_date></row><row _id="row-u4ky~4h7s_ic8s" _uuid="00000000-0000-0000-3118-5F8C8691D679" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u4ky~4h7s_ic8s"><intent_id>541245</intent_id><project_id>698352</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-29T00:00:00</comment_date></row><row _id="row-qppe~qsv7-yrzs" _uuid="00000000-0000-0000-9E79-CD6BACCFCBCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qppe~qsv7-yrzs"><intent_id>472274</intent_id><project_id>668504</project_id><text_data>Tradesmen International, Inc. is a Construction Labor Support Company. As such, a Contractors Registrationis not required. Therefore, please approve this intent. Thank-you.</text_data><comment_date>2011-08-31T00:00:00</comment_date></row><row _id="row-5r2q-24sn-sh2z" _uuid="00000000-0000-0000-805C-E5D623F581AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5r2q-24sn-sh2z"><intent_id>481456</intent_id><project_id>673218</project_id><text_data>General laborer - Use of shovel and clean up workOther Trucks - 0 to 8, 000 gallon water truck used for dust control</text_data><comment_date>2011-10-03T00:00:00</comment_date></row><row _id="row-tjbd~sktw~b93c" _uuid="00000000-0000-0000-224E-628409B4EBCD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tjbd~sktw~b93c"><intent_id>1239855</intent_id><project_id>965814</project_id><text_data>Seattle - PN142206 Fringe Benefits:  15.88 Pension Plan 10.46 Educational Fund 0.64 Preservation Fund 0.54 Annuity 8.85 Vacation 4.62 Holiday 1.91 = 42.89 Rounded</text_data><comment_date>2022-06-08T00:00:00</comment_date></row><row _id="row-d7sj~xzuu~j7c8" _uuid="00000000-0000-0000-5C8B-7E6A4DD0F18E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7sj~xzuu~j7c8"><intent_id>1191282</intent_id><project_id>985173</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a thru 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2021-11-05T00:00:00</comment_date></row><row _id="row-2s3z-uv8j.424a" _uuid="00000000-0000-0000-2DF8-2624E9E3E2F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2s3z-uv8j.424a"><intent_id>1291594</intent_id><project_id>1045935</project_id><text_data>9906312</text_data><comment_date>2022-12-21T00:00:00</comment_date></row><row _id="row-7ebg-rn3z~9buy" _uuid="00000000-0000-0000-DB06-17FDFF8758F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ebg-rn3z~9buy"><intent_id>699044</intent_id><project_id>724146</project_id><text_data>90193 BP99 DP3</text_data><comment_date>2015-06-08T00:00:00</comment_date></row><row _id="row-qbxb.mzet-zdxa" _uuid="00000000-0000-0000-4311-7488058E2956" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbxb.mzet-zdxa"><intent_id>475928</intent_id><project_id>673648</project_id><text_data>Atkinson is self insured.</text_data><comment_date>2011-09-01T00:00:00</comment_date></row><row _id="row-3y6r_qajt.dr8q" _uuid="00000000-0000-0000-FBF4-5730D8FD16F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3y6r_qajt.dr8q"><intent_id>479833</intent_id><project_id>662746</project_id><text_data>Pond A Excavation Project2645 158th Avenue SE, Bellevue  WA</text_data><comment_date>2011-09-23T00:00:00</comment_date></row><row _id="row-grtw.9k2x~wbem" _uuid="00000000-0000-0000-8B53-C4FFBFFA431A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-grtw.9k2x~wbem"><intent_id>1207611</intent_id><project_id>997188</project_id><text_data>Replaces combined form 1037415</text_data><comment_date>2022-01-27T00:00:00</comment_date></row><row _id="row-dgc9.b8jg-wr7k" _uuid="00000000-0000-0000-54FA-A0098AD0E765" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgc9.b8jg-wr7k"><intent_id>496781</intent_id><project_id>480148</project_id><text_data>Prime contact: David Becker 253-845-9544</text_data><comment_date>2012-01-12T00:00:00</comment_date></row><row _id="row-mbvw~wneh_ryhz" _uuid="00000000-0000-0000-980A-BDDDD9F0D8F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbvw~wneh_ryhz"><intent_id>1169589</intent_id><project_id>974269</project_id><text_data>GU Job 21-259pw</text_data><comment_date>2021-08-17T00:00:00</comment_date></row><row _id="row-btzu~bc4t_xrst" _uuid="00000000-0000-0000-BB46-B6A3F6528250" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-btzu~bc4t_xrst"><intent_id>871335</intent_id><project_id>836003</project_id><text_data>Cut down 1 hazardous White Pine tree, leave debris in the woods.  Leave a 25 foot snag.</text_data><comment_date>2017-10-25T00:00:00</comment_date></row><row _id="row-ebau-59ss~vixz" _uuid="00000000-0000-0000-815C-A5E0ABE728C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebau-59ss~vixz"><intent_id>945858</intent_id><project_id>865214</project_id><text_data>GENERAL LABOR WORK CONSISTS OF THE FOLLOWING:1.) HAND WORK (SHOVEL WORK) NO POWER EQUIPMENT OR POWER TOOLS.2.) PILOT CAR DRIVER IS USED FOR MOBILIZING HEAVY EQUIPMENT TO AND FROM THE PROJECT SITE.BLADE OPERATOR IS USED FOR GRADING THE PROJECT SITE FOR COMPACTION BEFORE PAVING OPERATIONS.OTHER TRUCKS CONSIST OF THE FOLLOWING:1.) 0-8,000 GALLON WATER TRUCK USED FOR WATERING THE PROJECT SITE DURING THE GRADING PROCESS TO HELP WITH COMPACTION.2.) OIL DISTRIBUTOR IS USED FOR OIL DISTRIBUTION FOR CHIP SEALING OPERATIONS.</text_data><comment_date>2018-11-14T00:00:00</comment_date></row><row _id="row-7zns.rndv-a3jn" _uuid="00000000-0000-0000-CF50-B28E801DA8E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zns.rndv-a3jn"><intent_id>470489</intent_id><project_id>663925</project_id><text_data>Water truck used was the 6500 gallon stainless steel vacuum truck used to hold concrete slurry.</text_data><comment_date>2011-08-26T00:00:00</comment_date></row><row _id="row-tegf~dks7-mvnu" _uuid="00000000-0000-0000-FDFE-9A92301452F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tegf~dks7-mvnu"><intent_id>512895</intent_id><project_id>685979</project_id><text_data>Response for correction: The truck driver is for a Gang truck.</text_data><comment_date>2012-05-22T00:00:00</comment_date></row><row _id="row-4kuj-c8da_8z6k" _uuid="00000000-0000-0000-7EC3-8067F2972F15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4kuj-c8da_8z6k"><intent_id>1198489</intent_id><project_id>823535</project_id><text_data>Other trucks is a semi truck with a roll off bin delivered to siteBackhoe operators to dig up contaminated soil and dump in roll off binMotor Pat Grader will vacuum all contaminated liquidsDeckhands will layout boom and sorbent pads as directed by the CaptainCaptain will maneuver boat around contaminated water areasHaz Waste workers will clear area of all debris using shovels/rakes/brooms</text_data><comment_date>2021-12-10T00:00:00</comment_date></row><row _id="row-phpr~iaeg_fnu8" _uuid="00000000-0000-0000-F4B1-CF0BD796E6A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-phpr~iaeg_fnu8"><intent_id>890755</intent_id><project_id>844869</project_id><text_data>881312</text_data><comment_date>2018-03-01T00:00:00</comment_date></row><row _id="row-umy9_ksbs.qj75" _uuid="00000000-0000-0000-3204-C9472A621F3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-umy9_ksbs.qj75"><intent_id>1120228</intent_id><project_id>949386</project_id><text_data>LONG Job # 5050.210015</text_data><comment_date>2021-02-04T00:00:00</comment_date></row><row _id="row-pqiz_zpke.ytfn" _uuid="00000000-0000-0000-3EE9-ABD44FB66224" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqiz_zpke.ytfn"><intent_id>1022507</intent_id><project_id>899906</project_id><text_data>Winterization of the irrigation system with compressed air to ensure that water does not remain in the lines, heads or valves after deactivation.</text_data><comment_date>2019-12-11T00:00:00</comment_date></row><row _id="row-mei5~srxz.q9ky" _uuid="00000000-0000-0000-5B02-83FBE51065CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mei5~srxz.q9ky"><intent_id>758347</intent_id><project_id>790342</project_id><text_data>Water damage to Liberty High School, Drying Equipment set.</text_data><comment_date>2016-04-25T00:00:00</comment_date></row><row _id="row-g7ra.hhww.saq9" _uuid="00000000-0000-0000-CDA3-5338C7064962" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g7ra.hhww.saq9"><intent_id>812232</intent_id><project_id>811747</project_id><text_data>Carlton Electric, LLC is an Idaho contractor with reciprocating Industrial Insurance; account number is 639136</text_data><comment_date>2017-01-23T00:00:00</comment_date></row><row _id="row-qv2q.pjp2-96cp" _uuid="00000000-0000-0000-0CEA-05C36C6C77A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qv2q.pjp2-96cp"><intent_id>1074014</intent_id><project_id>926273</project_id><text_data>Mercer Island work order number &amp; address: 13559 - 6915 96th Ave SE, 11788 - 7402 92ND PL SE, 12271 - 9115 SE 72ND PL, 11785 - 9075 SE 79TH ST, 16352 - 2718 60th Ave SE, 16226 - 5019 E Mercer Way, 13821 - 8914 SE 56th St, 14670 - 6323 77th Ave SE, 12058 - 4043 W MERCER WAY, 12321 - 3656 W Mercer Way, 12319 - 4141 81st Ave SE, 12320 - 4207 W Mercer way, 13390 - 8337 E Mercer way, 15148 - 7653 W Mercer Way, 15659 - 3059 Island Crest Way, 10709 - 7420 SE 27th ST.</text_data><comment_date>2020-07-21T00:00:00</comment_date></row><row _id="row-ynug.asu6~zn86" _uuid="00000000-0000-0000-911F-3D65FC4BE7E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ynug.asu6~zn86"><intent_id>835516</intent_id><project_id>822359</project_id><text_data>Elect tech(06)Inside workFiberLAN(Local Area Network)</text_data><comment_date>2017-05-22T00:00:00</comment_date></row><row _id="row-r4xq-8inp_q24z" _uuid="00000000-0000-0000-6738-4ECC46C8035E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r4xq-8inp_q24z"><intent_id>1266983</intent_id><project_id>1031265</project_id><text_data>Job #661096</text_data><comment_date>2022-09-15T00:00:00</comment_date></row><row _id="row-rjg5_hqby_q3kz" _uuid="00000000-0000-0000-1996-8BB849EB978D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rjg5_hqby_q3kz"><intent_id>1062344</intent_id><project_id>921070</project_id><text_data>intent 301FCH059</text_data><comment_date>2020-06-03T00:00:00</comment_date></row><row _id="row-anhy.9mrz-9tjz" _uuid="00000000-0000-0000-2F64-920595F181D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-anhy.9mrz-9tjz"><intent_id>775050</intent_id><project_id>797057</project_id><text_data>220085</text_data><comment_date>2016-07-15T00:00:00</comment_date></row><row _id="row-7nut-a5kn-dy6i" _uuid="00000000-0000-0000-BD63-B7DB74EF3AAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7nut-a5kn-dy6i"><intent_id>558460</intent_id><project_id>695118</project_id><text_data>Form Filed By: Martha Denton</text_data><comment_date>2013-03-04T00:00:00</comment_date></row><row _id="row-ue83~san7_89zq" _uuid="00000000-0000-0000-2212-85BCDDF34D44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ue83~san7_89zq"><intent_id>1212203</intent_id><project_id>999976</project_id><text_data>9879686</text_data><comment_date>2022-02-17T00:00:00</comment_date></row><row _id="row-wk8y.cw7f.csi8" _uuid="00000000-0000-0000-055D-4420672E30D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wk8y.cw7f.csi8"><intent_id>1214208</intent_id><project_id>1001199</project_id><comment_date>2022-02-28T00:00:00</comment_date></row><row _id="row-i55p.7bw2~85uv" _uuid="00000000-0000-0000-5746-0951B6569E03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i55p.7bw2~85uv"><intent_id>1023842</intent_id><project_id>900534</project_id><text_data>9541943</text_data><comment_date>2019-11-26T00:00:00</comment_date></row><row _id="row-2tgu~hthp-xwnp" _uuid="00000000-0000-0000-0FE6-82A271CA1D32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tgu~hthp-xwnp"><intent_id>1054951</intent_id><project_id>917515</project_id><text_data>All work will be performed by subcontractors, except for possible punch-list items and/or possible site clean-up. Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with the wage rate determined by the Secretary of HUD to be prevailing in the locality with respect to such trade or position as provided under 24 CFR 965.101(a)(2)(iv). Filed by Kathi Clark.</text_data><comment_date>2020-04-30T00:00:00</comment_date></row><row _id="row-z88j-hvxu-snp4" _uuid="00000000-0000-0000-B09C-85FDDDABA038" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z88j-hvxu-snp4"><intent_id>808100</intent_id><project_id>809798</project_id><text_data>WO #8019457</text_data><comment_date>2016-12-21T00:00:00</comment_date></row><row _id="row-zps5-as85_e6su" _uuid="00000000-0000-0000-1D8A-933197C52044" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zps5-as85_e6su"><intent_id>757196</intent_id><project_id>789828</project_id><text_data>Clean up from Fire Damage</text_data><comment_date>2016-04-18T00:00:00</comment_date></row><row _id="row-7abg-qyu9_ksdj" _uuid="00000000-0000-0000-768D-CF21B9AE1FA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7abg-qyu9_ksdj"><intent_id>540218</intent_id><project_id>697989</project_id><text_data>Terminal 117 Yard remediation from Donovan St. So. to Dallas AVe. S `7 yards, alley &amp; CloverdaleGeneral Laborers to keep area clean of all debris using brooms/shovels and/or small hand toolsDump Truck &amp; Trailer to haul materials to and from job siteExcavator used to clear area of debris and dirt</text_data><comment_date>2012-10-17T00:00:00</comment_date></row><row _id="row-ub4f~gf69-7n9q" _uuid="00000000-0000-0000-2888-C01264A225F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ub4f~gf69-7n9q"><intent_id>1165153</intent_id><project_id>973127</project_id><text_data>#1- Install timer switch, variable speed switch, Install LED lights in hallway and laundry area#2- single family residence#3- single story#4(a)- no#4(b)- no#4(c)- yes#4(d)- no#4(e)- no#4(f)- no#4(g)- no#4(h)- no#4(i)- no#4(j)- no#4(k)- no#4(l)- N/A#5- yes#6- yes#7- no#8- no</text_data><comment_date>2021-07-31T00:00:00</comment_date></row><row _id="row-p4um~faz7~23v8" _uuid="00000000-0000-0000-61CA-63C349AB47A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4um~faz7~23v8"><intent_id>1087833</intent_id><project_id>916749</project_id><text_data>JCI Project # 0N59-0107 Subcontractor EC  UBI#601107330</text_data><comment_date>2020-09-14T00:00:00</comment_date></row><row _id="row-cmm8~gsme.w6xw" _uuid="00000000-0000-0000-398E-8DF8D2989534" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cmm8~gsme.w6xw"><intent_id>785308</intent_id><project_id>800920</project_id><text_data>From: Karma Rouse [mailto:Karma@wemcoinc.com] Sent: Friday, September 02, 2016 10:49 AMTo: Capek, Laurie (LNI)Subject: Corrections on Intent 785308 &amp; Affidavit 660711Corrections for Intent 785308 is NoneCorrections for Affidavit Bid due date      4/27/16Award date        5/3/16Please let me know if I need to do anything else.Karma Rouse PresidentWEMCO Incorporated5510 W Thorpe RdSpokane, WA 99224Main: +1 509 244 4773 | www.wemcoinc.com</text_data><comment_date>2016-09-02T00:00:00</comment_date></row><row _id="row-5w3m.3bx8.nv7b" _uuid="00000000-0000-0000-6257-6F5815A0E478" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5w3m.3bx8.nv7b"><intent_id>509483</intent_id><project_id>685789</project_id><text_data>092008</text_data><comment_date>2012-04-26T00:00:00</comment_date></row><row _id="row-ih6t-gkd6~jp3y" _uuid="00000000-0000-0000-F52D-A5C6B0C4010D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ih6t-gkd6~jp3y"><intent_id>568217</intent_id><project_id>710421</project_id><text_data>HEALTH SCIENCE CALL BACK</text_data><comment_date>2013-05-07T00:00:00</comment_date></row><row _id="row-u34z~pgh4_tdvb" _uuid="00000000-0000-0000-4AAF-99E9B9D0953C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u34z~pgh4_tdvb"><intent_id>928190</intent_id><project_id>857458</project_id><text_data>1. Remove and replace exterior light fixtures2. condo3. 34. NA5. yes6. yes7. unknown 8. unknown</text_data><comment_date>2018-08-27T00:00:00</comment_date></row><row _id="row-yy5w~tjw3.kebj" _uuid="00000000-0000-0000-7428-24E543BAFF8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yy5w~tjw3.kebj"><intent_id>865562</intent_id><project_id>832050</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2017-09-27T00:00:00</comment_date></row><row _id="row-9mak_yjuk-payi" _uuid="00000000-0000-0000-BB81-1ABEA76F30F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9mak_yjuk-payi"><intent_id>765071</intent_id><project_id>793209</project_id><text_data>Job # 8013500</text_data><comment_date>2016-05-31T00:00:00</comment_date></row><row _id="row-jn5f~9dhd~9x3y" _uuid="00000000-0000-0000-3A60-414394973227" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jn5f~9dhd~9x3y"><intent_id>508983</intent_id><project_id>508751</project_id><text_data>pyramid hired us</text_data><comment_date>2012-04-24T00:00:00</comment_date></row><row _id="row-mf4u_kkgw-7y4f" _uuid="00000000-0000-0000-A22A-4D514592A20B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mf4u_kkgw-7y4f"><intent_id>1273662</intent_id><project_id>1034789</project_id><text_data>Provide labor to install data cabling, fiber optics, build out IDFInside workElect tech(06)LAN(Local area network)</text_data><comment_date>2022-10-11T00:00:00</comment_date></row><row _id="row-hacr-id65-p87w" _uuid="00000000-0000-0000-406C-4849E6D03D8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hacr-id65-p87w"><intent_id>794491</intent_id><project_id>791603</project_id><text_data>From: June Shelly [mailto:junes@testcommllc.com] Sent: Thursday, May 04, 2017 11:33 AMTo: LNI RE Prevailing Wage Worker 1 &amp;lt;PW1@LNI.WA.GOV&amp;gt;Subject: Updated contract amountsGood morning!I�m not sure how important it is for subcontractors to update $ amounts on our Intents, but I have 2 that are different.T16-173 Spokane Valley City Hall our new contract amount is:  $10,160.00 for Intent #794491 ApprovedTA16-346 Spokane Cty Maint Bldg-Old Corral, Denison Chattaroy &amp; Eden Rd our contract amount for all 3 buildings is now $5605.00 for Intent #830901 just filed today, not yet approved.Please let me know what I need to do.Thank you!Respectfully,June ShellyBookkeeper �Be Still and Know��   2211 E. SpragueSpokane, WA 99202Office - 509-533-0498 Fax - 509-536-8491 Email: junes@testcommllc.comWebsite: www.testcommllc.com</text_data><comment_date>2017-05-05T00:00:00</comment_date></row><row _id="row-mu6u.wvbw-3zuy" _uuid="00000000-0000-0000-133E-3401B1B37A8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mu6u.wvbw-3zuy"><intent_id>983703</intent_id><project_id>852426</project_id><text_data>Tranport modular buildings</text_data><comment_date>2019-06-11T00:00:00</comment_date></row><row _id="row-69ze.xkp6.giwc" _uuid="00000000-0000-0000-310D-F7AA93586248" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-69ze.xkp6.giwc"><intent_id>874209</intent_id><project_id>837213</project_id><text_data>1613520</text_data><comment_date>2017-11-09T00:00:00</comment_date></row><row _id="row-yhe6.u2y3~esg9" _uuid="00000000-0000-0000-DD5E-BACBA9811EC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yhe6.u2y3~esg9"><intent_id>511952</intent_id><project_id>687665</project_id><text_data>General laborer includes laborer using shovel...other trucks include a under 4000 gallon water truck for dust control</text_data><comment_date>2012-05-15T00:00:00</comment_date></row><row _id="row-hjin.jr22-rqr6" _uuid="00000000-0000-0000-ABC7-32178771BBEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjin.jr22-rqr6"><intent_id>1238207</intent_id><project_id>1015833</project_id><text_data>LE 2111029</text_data><comment_date>2022-06-02T00:00:00</comment_date></row><row _id="row-q6hw~uuvm~wfvh" _uuid="00000000-0000-0000-C5B1-CABFAE431A3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q6hw~uuvm~wfvh"><intent_id>946098</intent_id><project_id>866603</project_id><text_data>From: Ziegert, Charles O (LNI) &amp;lt;ziec235@LNI.WA.GOV&amp;gt; Sent: Monday, September 16, 2019 7:06 AMTo: justin@etgfire.comSubject: Intent 946098 On CallGood morning,On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on--call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.aspThank you,Chuck ZiegertIndustrial Relations SpecialistCharles.Ziegert@lni.wa.govPrevailing WageDept of Labor and IndustriesPhone 360 902-4538Prevailing Wage 360 902-5335Prevailing Wage Information:http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp</text_data><comment_date>2019-09-16T00:00:00</comment_date></row><row _id="row-5nzh-gjr7.j9mn" _uuid="00000000-0000-0000-8610-F35F273FBB62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5nzh-gjr7.j9mn"><intent_id>624394</intent_id><project_id>732516</project_id><text_data>143184 Granger SD. Provide and install backbone cabling to new cabinet installed by others, terminate, test and label. Install will be indoors, and be utilized to provide voice and data connectivity to the new cabinet.</text_data><comment_date>2014-04-10T00:00:00</comment_date></row><row _id="row-r7zu-9uub-rh5c" _uuid="00000000-0000-0000-C861-571B976663CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r7zu-9uub-rh5c"><intent_id>931421</intent_id><project_id>860911</project_id><text_data>Other Truck - Water Truck 3000 gals for dust control</text_data><comment_date>2018-09-07T00:00:00</comment_date></row><row _id="row-59az-2777_bhvu" _uuid="00000000-0000-0000-F816-E970E4C87B53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-59az-2777_bhvu"><intent_id>446798</intent_id><project_id>633064</project_id><text_data>586,711-01 Industrial Insurance Acct # - looe235</text_data><comment_date>2011-03-26T00:00:00</comment_date></row><row _id="row-ntxp_ew2n.d6t8" _uuid="00000000-0000-0000-A9E0-705D6C4D7E02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ntxp_ew2n.d6t8"><intent_id>873825</intent_id><project_id>835493</project_id><text_data>HIRED BY SUB WESTWIND CONCRETE</text_data><comment_date>2017-11-08T00:00:00</comment_date></row><row _id="row-2h3b.2rsa.dkdj" _uuid="00000000-0000-0000-2BAD-707AA171A297" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2h3b.2rsa.dkdj"><intent_id>1177111</intent_id><project_id>972641</project_id><text_data>Gary Reed's Excavating &amp; Trucking is a rental truck company.</text_data><comment_date>2021-09-13T00:00:00</comment_date></row><row _id="row-s5cy.k7ph.u8wk" _uuid="00000000-0000-0000-478E-A70DFB36D051" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s5cy.k7ph.u8wk"><intent_id>779976</intent_id><project_id>782101</project_id><text_data>Install irrigation system, supply / place 6� topsoil in planting beds, supply / install plant material, install edging, place 2� mulch in planting beds, sod lawn.  Equipment to be used:  hand tools, power equipment under 90 hp (bobcat, mini-excavator)</text_data><comment_date>2016-08-04T00:00:00</comment_date></row><row _id="row-yz5i-r6t3.g3rr" _uuid="00000000-0000-0000-9632-92B2899AD988" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yz5i-r6t3.g3rr"><intent_id>899024</intent_id><project_id>848518</project_id><text_data>0618014</text_data><comment_date>2018-04-17T00:00:00</comment_date></row><row _id="row-54dm-va9m-f29c" _uuid="00000000-0000-0000-00DF-7FDCA1CBF2F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-54dm-va9m-f29c"><intent_id>751848</intent_id><project_id>787421</project_id><text_data>two equipment trailers</text_data><comment_date>2016-03-18T00:00:00</comment_date></row><row _id="row-w9yy.6wqe~dqai" _uuid="00000000-0000-0000-39BD-B91AEB12B7CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9yy.6wqe~dqai"><intent_id>925312</intent_id><project_id>854243</project_id><text_data>PC6 - Job #6306CB</text_data><comment_date>2018-08-14T00:00:00</comment_date></row><row _id="row-pugf.nimf-mswd" _uuid="00000000-0000-0000-29C0-2D3B0D8D4147" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pugf.nimf-mswd"><intent_id>1057190</intent_id><project_id>918599</project_id><text_data>We simply provided routine landscape maintenance on the property.  Mowing, edging, weedeating, hand pruning, debris pick up</text_data><comment_date>2020-05-11T00:00:00</comment_date></row><row _id="row-4twk_fg55_8u4c" _uuid="00000000-0000-0000-1760-F66BCE2AF143" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4twk_fg55_8u4c"><intent_id>1089047</intent_id><project_id>927608</project_id><text_data>Professional Services - Technical and Scientific in Nature, Exempt</text_data><comment_date>2020-09-17T00:00:00</comment_date></row><row _id="row-d2cf.v9fs-jfj3" _uuid="00000000-0000-0000-2AFE-D76602BE9284" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d2cf.v9fs-jfj3"><intent_id>335070</intent_id><project_id>660613</project_id><text_data>The entire project was the construction of a fire station house.  Our portion was only to put in concrete curbing around flowerbed (we did not put in the flower beds, only the curbing).  This requires us to hand mix cement in a cement mixer in the back of our truck, put the cement in a wheelbarrow, shovel the cement into a small curbing extruding machine which spits out the curb, then hand trowel the cement smooth.  The laborer was responsible to help shovel the cement into the extruder.  The entire job took about 4 hours and we did not have anything else to do with the remainder of the project.  A picture of the curbing we installed can be seen in picture #2 of this website: http://synergyconstruction.com/fire-station-30.html.</text_data><comment_date>2011-09-27T00:00:00</comment_date></row><row _id="row-ysq9~zhku~5p4h" _uuid="00000000-0000-0000-BEC6-5F98F63D60E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ysq9~zhku~5p4h"><intent_id>1040264</intent_id><project_id>909442</project_id><text_data>Other truck is a 4,000 gallon water truck</text_data><comment_date>2020-02-21T00:00:00</comment_date></row><row _id="row-qrdq~cgw8~vete" _uuid="00000000-0000-0000-2808-C6DACA9F4D50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qrdq~cgw8~vete"><intent_id>784702</intent_id><project_id>775056</project_id><text_data>General laborer consists of hand work (no power tools or equipment) $28.81 base + $7.20 pensionBlade operator is used for grading the project for compaction before paving or chip sealing operations $32.99 base + $8.25 pensionOther trucks consists of the following:1) 0 to 8,000 gallon water truck used to help with the grading process and dust control $33.63 base + $8.41 pension2) Oil distributor - used for oil distribution for chip sealing operations $33.63 base + $8.41 pension</text_data><comment_date>2016-08-24T00:00:00</comment_date></row><row _id="row-at2b~9hjm_wv6z" _uuid="00000000-0000-0000-1D45-3943471A6BFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-at2b~9hjm_wv6z"><intent_id>1081696</intent_id><project_id>927898</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. INSTALLATION OF A DUCTLESS HEAT PUMP SYSTEM#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? MANUFACTURED HOME#3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure?  NO(b) Any retail use in the structure? NO (c) Permanent residence only?  YES(d) Rehabilitation house?  NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO (I) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO(l) Other? N/A#5 - Does each dwelling unit have its own self-contained kitchen? N/A #6 - Does each dwelling unit have its own bathroom? N/A#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2020-08-19T00:00:00</comment_date></row><row _id="row-du2u~yqn3.t27c" _uuid="00000000-0000-0000-3A44-C85FACC99F46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-du2u~yqn3.t27c"><intent_id>673272</intent_id><project_id>715706</project_id><text_data>Form filed by: Calvin E. Melton</text_data><comment_date>2015-01-13T00:00:00</comment_date></row><row _id="row-73ue~hhnt.2gin" _uuid="00000000-0000-0000-CBF3-F68D3B086D44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73ue~hhnt.2gin"><intent_id>1060657</intent_id><project_id>919848</project_id><text_data>Notice to Proceed 05/21/2020</text_data><comment_date>2020-05-27T00:00:00</comment_date></row><row _id="row-5r77~79h2~z8ag" _uuid="00000000-0000-0000-8211-79B7EC7235B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5r77~79h2~z8ag"><intent_id>531583</intent_id><project_id>693342</project_id><text_data>THESE STRUCTURES ARE USED AS PERMANENT SINGLE FAMILY RESIDENCES. EACH UNIT HAS IT'S OWN KITCHEN AND BATHROOM. THESE STRUCTURES ARE ALL SINGLE FAMILY RESIDENTIAL PROJECTS ONLY. ABSOLUTELY NO WORK WILL BE, OR HAS BEEN PERFORMED ON A COMMUNITY BUILDING, OR PUBLIC AREA. THE PURPOSE OF THIS PROJECT IS TO ALTER, REPAIR, IMPROVE, OR MAINTAIN THE SINGLE FAMILY RESIDENCE THAT IS USED SOLELY AS A PERMANENT RESIDENCE.</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-tmb8~6kuh-79gw" _uuid="00000000-0000-0000-40C5-4576812CBD3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tmb8~6kuh-79gw"><intent_id>900347</intent_id><project_id>849066</project_id><text_data>#20039, Scott Smilden, 7218 N. Edmond, Spokane#19996, Kenneth Knaus, 1817 N. Rambo Rd., Spokane#20045, Mike Bye, 3012 W. Dalke, Spokane#20049, Patricia Mills, 512 W. Princeton, Spokane#20019, Lawerence Allenfort, 6903 N. Fox point D., Spokane1. Weatherization, 2. Single Family Home, 3. 2-story, 4. A.no, B.no, C.yes, D.no, E.no, F.no, G.no, H.no, I.no, J.no, K.no, L.n/a, 5. yes, 6. yes, 7. no, 8. no#20051, Krystal Flores, 2518 E. Boone, Spokane#20030, Jacob Klever, 323 E. Rockwell, Spokane#20020, Eric Sumner, 2028 E. Rich, Spokane#20054, Shawn Disney, 2201 N. Craig Rd., #141, Spokane#20056, Thomas Clark, 1510 N. Holl Rd., Liberty Lake</text_data><comment_date>2018-04-24T00:00:00</comment_date></row><row _id="row-v3ik_rrs8~7fxf" _uuid="00000000-0000-0000-0BDC-9BE5B71ECC10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3ik_rrs8~7fxf"><intent_id>821267</intent_id><project_id>815857</project_id><text_data>Corrected trade and occupation</text_data><comment_date>2017-03-29T00:00:00</comment_date></row><row _id="row-ks9n_c7rf-mhq5" _uuid="00000000-0000-0000-3E0F-47F6F77D42EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ks9n_c7rf-mhq5"><intent_id>530359</intent_id><project_id>693281</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2012-08-23T00:00:00</comment_date></row><row _id="row-iyf4_eprb.5ggy" _uuid="00000000-0000-0000-F341-57CEAAFCB5E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iyf4_eprb.5ggy"><intent_id>553167</intent_id><project_id>703546</project_id><text_data>The contract amount includes sales tax and filing fee</text_data><comment_date>2013-01-23T00:00:00</comment_date></row><row _id="row-ui5b.zhb8-rwkr" _uuid="00000000-0000-0000-D48B-6802B31D0C38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ui5b.zhb8-rwkr"><intent_id>814792</intent_id><project_id>803869</project_id><text_data>127001</text_data><comment_date>2017-02-07T00:00:00</comment_date></row><row _id="row-5v9u~mfpx-ttww" _uuid="00000000-0000-0000-60CC-C74B0B5C1872" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5v9u~mfpx-ttww"><intent_id>635700</intent_id><project_id>718659</project_id><text_data>This intent if filed by Bart North, owner of North Engineering.  Rodney Jones is no longer employed at North Engineering</text_data><comment_date>2014-06-17T00:00:00</comment_date></row><row _id="row-rajs.3kqa_27im" _uuid="00000000-0000-0000-069D-10A50A9E5816" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rajs.3kqa_27im"><intent_id>675138</intent_id><project_id>753872</project_id><text_data>Job # 101158-001</text_data><comment_date>2015-01-16T00:00:00</comment_date></row><row _id="row-eett_n2rz~5rtn" _uuid="00000000-0000-0000-D15F-2DBBE4C968D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eett_n2rz~5rtn"><intent_id>761858</intent_id><project_id>787948</project_id><text_data>FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLANS IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2016-05-12T00:00:00</comment_date></row><row _id="row-njte.gdxk~fvea" _uuid="00000000-0000-0000-27FF-BFAEB3DB94C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-njte.gdxk~fvea"><intent_id>577646</intent_id><project_id>713208</project_id><text_data>Form filed by: Gerlof Boonstra</text_data><comment_date>2013-06-26T00:00:00</comment_date></row><row _id="row-shpm-ujqz_ns7r" _uuid="00000000-0000-0000-68E2-82DDA733EDDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-shpm-ujqz_ns7r"><intent_id>968294</intent_id><project_id>876708</project_id><text_data>Tucci Job No 381Project is FEDERAL.</text_data><comment_date>2019-03-28T00:00:00</comment_date></row><row _id="row-d64m-r4ms-j6mr" _uuid="00000000-0000-0000-952E-BFE6685F9987" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d64m-r4ms-j6mr"><intent_id>896691</intent_id><project_id>845764</project_id><text_data>Job #114346-001 Related to Job #202132-002</text_data><comment_date>2018-04-04T00:00:00</comment_date></row><row _id="row-8k4x-wn2m~sexg" _uuid="00000000-0000-0000-062E-44507EEB6EBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8k4x-wn2m~sexg"><intent_id>1465842</intent_id><project_id>1144678</project_id><text_data>1.Install new heat pump2.Single Family3.One4.   (a) Any commercial use in the structure? No   (b) Any retail use in the structure? No   (c) Permanent residence only? Yes   (d) Rehabilitation house? No   (e) Transitional housing? No   (f) Communal dining facility? No   (g) Treatment services? No   (h) Assisted living services? No   (I) Dormitories? No   (j) Counseling? No   (k) Is each room and/or bed in the structure rented separately? No   (l) Other?  5.Yes6.Yes7.No8.No</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-j2y3.rykp~p435" _uuid="00000000-0000-0000-EFF5-6F5DBC14BE1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j2y3.rykp~p435"><intent_id>1469461</intent_id><project_id>1146519</project_id><text_data>9953837</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-8sm9.gqui-q48h" _uuid="00000000-0000-0000-A45F-301D010088CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8sm9.gqui-q48h"><intent_id>1468284</intent_id><project_id>1123577</project_id><text_data>Lock out tag out as needed � Troubleshoot current system alarms � Perform Annual Preventative Maintenance � Make recommendation's and/or repair proposalWe will be planting a variety of different plants for this small project.</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-icp4_8qmh-kfpj" _uuid="00000000-0000-0000-BDAF-2E5BB3B581C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-icp4_8qmh-kfpj"><intent_id>924548</intent_id><project_id>858325</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Demo Kitchen and bathroom cabinets and bathrooms. Install new kitchen and bathroom cabinets. install bathrooms and kitchen countertops.Install bathtubs and tub surround. Install interior doors and hardware. Install exhaust fan.  #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? apartment#3 - Including any basement or garage, how many stories or levels does the structure have? 3#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no(b) Any retail use in the structure? no(c) Permanent residence only? yes(d) Rehabilitation house? no(e) Transitional housing? no(f) Communal dining facility? no(g) Treatment services? no(h) Assisted living services? no(I) Dormitories? no(j) Counseling? no(k) Is each room and/or bed in the structure rented separately? no(l) Other? na#5 - Does each dwelling unit have its own self-contained kitchen? yes#6 - Does each dwelling unit have its own bathroom? yes#7 - Is there a community facility or manager�s office on site?yes #8 - Is any part of the structure used by members of the public?no</text_data><comment_date>2018-08-09T00:00:00</comment_date></row><row _id="row-qjbv_v6z3-8j78" _uuid="00000000-0000-0000-8F8F-04D7CA99DD58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qjbv_v6z3-8j78"><intent_id>980114</intent_id><project_id>874533</project_id><text_data>GENERAL LABORER:  PERFORMS FINAL CLEANUP AFTER THE CONSTRUCTION HAS BEEN COMPLETED.  TOOLS: SHOVELSTRK DRIVER/OTHER:  WATER TRUCKS WHICH HOLD UP TO 4000 GAL OF WATER.  USED FOR DUST CONTROL AND COMPACTION</text_data><comment_date>2019-05-23T00:00:00</comment_date></row><row _id="row-au2v_cksu~jhfm" _uuid="00000000-0000-0000-4ED9-5806AA873DF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-au2v_cksu~jhfm"><intent_id>853682</intent_id><project_id>815309</project_id><text_data>Vacation 1.86, Medical 4.32 = $6.18. $18.57-$6.18=$12.39</text_data><comment_date>2017-08-09T00:00:00</comment_date></row><row _id="row-g74z~yf7n-xu6w" _uuid="00000000-0000-0000-9ACB-F4DAC50B79CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g74z~yf7n-xu6w"><intent_id>505679</intent_id><project_id>685040</project_id><text_data>This is a correction of intent #498576 due to following:incorrect occupation and wagechecked the &amp;quot;yes&amp;quot; box for HIRING SUBS FOR ALL WORK, should be NOchecked &amp;quot;no&amp;quot; box for WILL COMPANY HAVE ANY EMPLOYEES PERFORM WORK, should be YES</text_data><comment_date>2012-03-28T00:00:00</comment_date></row><row _id="row-986v.qi5f.wkgz" _uuid="00000000-0000-0000-5FAC-6D2F8F162D84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-986v.qi5f.wkgz"><intent_id>631805</intent_id><project_id>734804</project_id><text_data>Form filed by: Dixie L Grey</text_data><comment_date>2014-05-28T00:00:00</comment_date></row><row _id="row-c54t~zsey-wng6" _uuid="00000000-0000-0000-5EE8-77C72A8BC3AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c54t~zsey-wng6"><intent_id>1269100</intent_id><project_id>979228</project_id><text_data>Installation and removal of temporary construction fence</text_data><comment_date>2022-09-23T00:00:00</comment_date></row><row _id="row-ueii~4687-g64i" _uuid="00000000-0000-0000-6D1D-9841CFC82494" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ueii~4687-g64i"><intent_id>564258</intent_id><project_id>708013</project_id><text_data>for the correction you need regarding the specific type, size and purpose of the truck operated by the Truck Driver/Other trucks is he is a spreader operator, he drives a semi truck asphalt spreader and puts hot oil on the roads the truck is a tanker 3 axle truck</text_data><comment_date>2013-04-24T00:00:00</comment_date></row><row _id="row-37z6_used~ugwe" _uuid="00000000-0000-0000-8CDE-8E02DC7ED6CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-37z6_used~ugwe"><intent_id>1151249</intent_id><project_id>965971</project_id><text_data>Invoice 904943-00 / SRO 1912003</text_data><comment_date>2021-06-09T00:00:00</comment_date></row><row _id="row-gse2.awjk-263r" _uuid="00000000-0000-0000-7A82-36300641BAF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gse2.awjk-263r"><intent_id>1237573</intent_id><project_id>1015558</project_id><text_data>303654</text_data><comment_date>2022-05-31T00:00:00</comment_date></row><row _id="row-fm67_pajh-rdr8" _uuid="00000000-0000-0000-ECB2-9D91A2A318B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fm67_pajh-rdr8"><intent_id>687708</intent_id><project_id>758306</project_id><text_data>General Laborer: Performs work of shoveling with a hand shovel, cleanin-sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket.Other Trucks: A Low Boy trailer for pick up and delivery of equipment.This is for both PO #1502P01 and Sub Agreement 1502S07</text_data><comment_date>2015-04-07T00:00:00</comment_date></row><row _id="row-v9ai~6zxx_6nrm" _uuid="00000000-0000-0000-25F2-C9B73D2FAED7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v9ai~6zxx_6nrm"><intent_id>777026</intent_id><project_id>794555</project_id><text_data>Hydroseeding (or hydraulic mulch seeding, hydro-mulching, hydraseeding) is a planting process that uses a slurry of seed and mulch. It is often used as an erosion control technique on construction sites, as an alternative to the traditional process of broadcasting or sowing dry seed.Employees will be moving hydroseed hoses, and moving materials.</text_data><comment_date>2016-07-22T00:00:00</comment_date></row><row _id="row-u725~rjy7~qdhw" _uuid="00000000-0000-0000-013A-DDDBA6E8A316" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u725~rjy7~qdhw"><intent_id>825697</intent_id><project_id>817744</project_id><text_data>340 Nolle St307 Murdock24443 Wicker Road #2111453 Bayview Edison Rd #35</text_data><comment_date>2017-04-10T00:00:00</comment_date></row><row _id="row-xxh8-ah6c_8g84" _uuid="00000000-0000-0000-FEE1-FDF3D33D3FE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xxh8-ah6c_8g84"><intent_id>1241658</intent_id><project_id>1017834</project_id><text_data>9893227</text_data><comment_date>2022-06-15T00:00:00</comment_date></row><row _id="row-q6m8-n5z6~fue4" _uuid="00000000-0000-0000-6ABD-1F79CCDB818C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q6m8-n5z6~fue4"><intent_id>757870</intent_id><project_id>790126</project_id><text_data>Filed by Staci T FlowersProject is exempt from state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2016-04-21T00:00:00</comment_date></row><row _id="row-rexf_d96m-u9zu" _uuid="00000000-0000-0000-4BF8-9B724ECC52DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rexf_d96m-u9zu"><intent_id>793291</intent_id><project_id>803966</project_id><text_data>096106</text_data><comment_date>2016-10-02T00:00:00</comment_date></row><row _id="row-h7bb~d8xi.83bb" _uuid="00000000-0000-0000-CB14-5C830DBBA72B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h7bb~d8xi.83bb"><intent_id>793182</intent_id><project_id>785293</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2016-09-30T00:00:00</comment_date></row><row _id="row-tq9d-n3zg-qymi" _uuid="00000000-0000-0000-F578-2CE53BA13E32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tq9d-n3zg-qymi"><intent_id>474716</intent_id><project_id>673178</project_id><text_data>THIS PROJECT IS A WORK ORDER ON A JOB ORDER CONTRACT</text_data><comment_date>2011-08-26T00:00:00</comment_date></row><row _id="row-2dwh-citg-6skm" _uuid="00000000-0000-0000-DC63-C5869EF9FA3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2dwh-citg-6skm"><intent_id>982295</intent_id><project_id>883094</project_id><text_data>Intent 301SNJ0354</text_data><comment_date>2019-06-04T00:00:00</comment_date></row><row _id="row-j767-ibs8-kmpa" _uuid="00000000-0000-0000-6D54-45E0E64C5311" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j767-ibs8-kmpa"><intent_id>607832</intent_id><project_id>723528</project_id><text_data>Martin Yost the Owner will be working on this Project.</text_data><comment_date>2013-12-10T00:00:00</comment_date></row><row _id="row-zefn-qw3p_tmnw" _uuid="00000000-0000-0000-0E48-55D406BEB8EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zefn-qw3p_tmnw"><intent_id>1161832</intent_id><project_id>970595</project_id><text_data>#1 We are contracted to remove old window film and install new film to create more privacy. #2 No#3 1#4  Municipal Court  (a) Yes (b) No (c) no (d) No (e) No (f) No (g) No (h) No (I) No (j) No (k) No (l) None #5 No #6 No#7 No#8 Yes</text_data><comment_date>2021-07-20T00:00:00</comment_date></row><row _id="row-cfcr~py7u-n5zh" _uuid="00000000-0000-0000-9529-6AA57F6FB6C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cfcr~py7u-n5zh"><intent_id>625924</intent_id><project_id>732914</project_id><text_data>JOB 42210</text_data><comment_date>2014-04-22T00:00:00</comment_date></row><row _id="row-22eg~nhsb.6zj2" _uuid="00000000-0000-0000-CE9B-0D2B78CE0011" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22eg~nhsb.6zj2"><intent_id>694283</intent_id><project_id>762156</project_id><text_data>Custom Gate Material Fabrication Excavation and Cement Post</text_data><comment_date>2015-05-13T00:00:00</comment_date></row><row _id="row-9ax3_bif6-dvsw" _uuid="00000000-0000-0000-4986-EEC879D51A4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ax3_bif6-dvsw"><intent_id>1214646</intent_id><project_id>1001490</project_id><text_data>PTL SO 163936</text_data><comment_date>2022-03-01T00:00:00</comment_date></row><row _id="row-5cf3-nx8m_32ha" _uuid="00000000-0000-0000-97E2-FE7970523086" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5cf3-nx8m_32ha"><intent_id>912386</intent_id><project_id>846006</project_id><text_data>Fringe consists of $10.80 Medical and $7.77 Pension.</text_data><comment_date>2018-06-19T00:00:00</comment_date></row><row _id="row-imeb.pk7g_e2yj" _uuid="00000000-0000-0000-6BD3-267AEB7ABE6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imeb.pk7g_e2yj"><intent_id>855500</intent_id><project_id>830217</project_id><text_data>Potential vehicles used for truck driver category;FORD E350 VANFORD RANGER 4 x4CHEVY ASTRO VANFORD VAN TRANSIT CONNECTDODGE JOURNEYFORD F-150 SUPE RCAB 4x4DODGE RAM 1500CHEVY EQUINOX</text_data><comment_date>2017-08-17T00:00:00</comment_date></row><row _id="row-sjc2.qxr7~p5v4" _uuid="00000000-0000-0000-F817-AE0F64561065" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sjc2.qxr7~p5v4"><intent_id>631401</intent_id><project_id>735678</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-06-10T00:00:00</comment_date></row><row _id="row-zqr2_uxt5_3sk4" _uuid="00000000-0000-0000-449C-C005241B84DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zqr2_uxt5_3sk4"><intent_id>1469342</intent_id><project_id>1071619</project_id><text_data>Per WAC &amp; RCW codes and through the beautification of a plot of land our firms has been hired for the following: initial landscape construction work includes planting shrubs, laying bark mulch and topsoil type a.</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-wgbx~p5cc~absq" _uuid="00000000-0000-0000-E492-BE2B18B14FD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wgbx~p5cc~absq"><intent_id>1469446</intent_id><project_id>1132115</project_id><text_data>No contractor's license required</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-crsx~nvjm~aq9b" _uuid="00000000-0000-0000-663F-C672B7AECCC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-crsx~nvjm~aq9b"><intent_id>1469174</intent_id><project_id>1146366</project_id><text_data>PROPOSAL FS03985, INVOICE 940049184, CUST PO 2011</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-g8iw.9m6t-3qzp" _uuid="00000000-0000-0000-6969-7E86D4E17484" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8iw.9m6t-3qzp"><intent_id>1458749</intent_id><project_id>1140982</project_id><text_data>A. Whole Project - Strip and remodel a fluoroscopic room in a medical facility. B. Our part: Demolition &amp; Abatement of the fluoroscopic room.C. Duties performed by general laborers - demolition tools, no heavy equipment</text_data><comment_date>2024-09-17T00:00:00</comment_date></row><row _id="row-9qnm-iik9.mcj4" _uuid="00000000-0000-0000-9F5D-DEDD8134B1CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9qnm-iik9.mcj4"><intent_id>1465545</intent_id><project_id>1139619</project_id><text_data>#1. Take out insulation#2. Single family dwelling#3. 2 story#4.(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j) no(k) no(l) no. #5. no #6. no#7. no#8. no</text_data><comment_date>2024-09-20T00:00:00</comment_date></row><row _id="row-m9hd~iiy7_tpvd" _uuid="00000000-0000-0000-3ABC-3D69D6704E78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m9hd~iiy7_tpvd"><intent_id>1465573</intent_id><project_id>1144537</project_id><text_data>Other Trucks is Lowboy Truck</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-5wg4-m2gd.w4fv" _uuid="00000000-0000-0000-B2F7-9AD8CCADAADF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5wg4-m2gd.w4fv"><intent_id>1465945</intent_id><project_id>1139969</project_id><text_data>Truck Drivers-Other Trucks: Semi (tractors) with 53 foot flatbed trailer hauling guardrail material and equipment.</text_data><comment_date>2024-09-12T00:00:00</comment_date></row><row _id="row-6kpx~d3vv.zv4r" _uuid="00000000-0000-0000-8314-AE8243565246" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6kpx~d3vv.zv4r"><intent_id>963749</intent_id><project_id>874866</project_id><text_data>Additional Information - Herrera will collect selcted media and drainage layer components - HERRERA WILL CONNECT TUBING TO BATTERY AND TURN ON. NO TOOLS WERE USED. #2 - The specific work to be performed is for site durveying, hydrologic analysis and facility sizing - HERRERA PROVIDED ENGINEERING SUPPORT TO FACILITATE THE INSTAL OF A TEST FILTRATION SYSTEM. HERRERA SAT THE SENSOR IN A PIPE. NO TOLLS WERE USED. #3 - Herrera will install automated samplers and flow monitoring equipment at the test filtration system&amp;#39;s inlet and outlet - HERRERA BROUGHT THE FILTRATION SYSTEM TO THE SITE. THE CITY PUT THE FILTRATION SYSTEM IN PLACE #4 - install flow monitoring equipment to measure bypass flows from the test filtration system. - HERRERA SAT THE FLOW MONIOTRING EQUIP.DOWN #5 - The endosure will be bolted to the round with sonduit installed � THE CITY BOLTED THE CONDUIT. HERRERA JUST PROVIDED IT #6 - Samples are needed to be collected fvrom the inlet and outlet - HERRERA USED A SAMPLE BOTTLE TO SCOOP THE WATER SAMPLES UP #7 - Additional samples will also be collect - HERRERA WILL USE SAMPLE BOTTLES TO SCOOP THE WATER SAMPLES UP #8 - Trip to deploy ice and calibrate level sensors - HERRERA WILL DRIVE A CAR TO THE STORE AND THEN SITE TO DEPLOY ICE. HERRERA WILL USE THEIR FINGERS TO CALIBRATE THE LEVEL - Collection of additional samples - HERRERA WILL USE SAMPLE BOTTLES TO SCOOP THE WATER SAMPLES UP - As well as coordination of all work efforts with the dsignated client point of contract and all subconsultants - HERRERA WILL COORDINATE WITH CLIENT POINT OF CONTACT AND ALL SUBS VIA PHONE, EMAIL OR FACE TO FACE MEETINGS.</text_data><comment_date>2019-04-24T00:00:00</comment_date></row><row _id="row-a9f9.fd67.4k9u" _uuid="00000000-0000-0000-62CB-74E3629B6947" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a9f9.fd67.4k9u"><intent_id>1278577</intent_id><project_id>1037478</project_id><text_data>INV # 89211422 SR # 53017742</text_data><comment_date>2022-10-28T00:00:00</comment_date></row><row _id="row-e7vf_stdn.3qbu" _uuid="00000000-0000-0000-6F86-6FE49B2CC9A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e7vf_stdn.3qbu"><intent_id>1064989</intent_id><project_id>918936</project_id><text_data>Idaho Workers Comp 618616</text_data><comment_date>2020-06-12T00:00:00</comment_date></row><row _id="row-bpgf.xv9b-d26w" _uuid="00000000-0000-0000-B3DE-0DBED5081136" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bpgf.xv9b-d26w"><intent_id>607821</intent_id><project_id>715322</project_id><text_data>Heavy haul trucks hauling concrete bridge girders with steer trailers</text_data><comment_date>2013-12-10T00:00:00</comment_date></row><row _id="row-7824~rqis~64sz" _uuid="00000000-0000-0000-7183-95BF706ADC35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7824~rqis~64sz"><intent_id>770376</intent_id><project_id>795233</project_id><text_data>056046</text_data><comment_date>2016-06-23T00:00:00</comment_date></row><row _id="row-dtkm.tfkm_zfgb" _uuid="00000000-0000-0000-B04F-3130EC5F7E31" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dtkm.tfkm_zfgb"><intent_id>1146814</intent_id><project_id>963506</project_id><text_data>We are installing bark into landscape beds. The owner will be performing the installation, while laborers perform cleanup with a leaf blower which falls under the landscape beautification classification. The laborers will be paid the published rate for Groundskeeper under Landscape Maintenance.</text_data><comment_date>2021-05-23T00:00:00</comment_date></row><row _id="row-gkaw-equw~5hbj" _uuid="00000000-0000-0000-7782-C9D68DD5CF46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gkaw-equw~5hbj"><intent_id>965468</intent_id><project_id>865976</project_id><text_data>Job 1268</text_data><comment_date>2019-03-15T00:00:00</comment_date></row><row _id="row-5g6e.2j5i~wtu3" _uuid="00000000-0000-0000-D931-2721D5C15E6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5g6e.2j5i~wtu3"><intent_id>1024268</intent_id><project_id>900742</project_id><comment_date>2019-11-27T00:00:00</comment_date></row><row _id="row-k2wz-ht4h.ccme" _uuid="00000000-0000-0000-AFA1-21130F5C556E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k2wz-ht4h.ccme"><intent_id>578250</intent_id><project_id>714427</project_id><text_data>This is a JOC filing on an individual job order under Centennial Contractors Ent., Inc.</text_data><comment_date>2013-06-28T00:00:00</comment_date></row><row _id="row-8bz9-yqvt.5ydk" _uuid="00000000-0000-0000-A214-4E5642B9C802" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8bz9-yqvt.5ydk"><intent_id>544166</intent_id><project_id>672068</project_id><text_data>Work to be performed will be final seeding of lawn areas with a 75hp Bowie Hydroseeder</text_data><comment_date>2012-11-12T00:00:00</comment_date></row><row _id="row-swh3_488a-a5k3" _uuid="00000000-0000-0000-6662-08E7A7E75EDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-swh3_488a-a5k3"><intent_id>732501</intent_id><project_id>777257</project_id><text_data>PLEASE SEE  HUD HOUSING PROJECTS - FEDERAL PREEMPTION, THE HOUSING ACT OF 1937 AND 24cfr 965.101.THIS JOB IS CLAIMING EXEMPTION BASED ON FEDERAL PREEMPTION FROM THE PAYMENT OF STATE PREVAILING WAGE RATES BASED ON THE HOUSING ACT OF 1937 AND 24 CFR 965.101</text_data><comment_date>2015-11-20T00:00:00</comment_date></row><row _id="row-mb8n~3spg_mnb4" _uuid="00000000-0000-0000-6F67-922638B6B4B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mb8n~3spg_mnb4"><intent_id>651454</intent_id><project_id>742302</project_id><text_data>Form filed by: S Gregg Taylor</text_data><comment_date>2014-08-29T00:00:00</comment_date></row><row _id="row-3bph_67fh~66h4" _uuid="00000000-0000-0000-110A-E8AA94025308" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bph_67fh~66h4"><intent_id>1085176</intent_id><project_id>927466</project_id><text_data>Labor and materials</text_data><comment_date>2020-09-01T00:00:00</comment_date></row><row _id="row-2izv-55xp~m66g" _uuid="00000000-0000-0000-0810-7A93D840A0DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2izv-55xp~m66g"><intent_id>540268</intent_id><project_id>697108</project_id><text_data>Freeland Industries was hired to perform site preparation, Environmental protection, minor earthwork, planting, and trail construction.</text_data><comment_date>2012-10-17T00:00:00</comment_date></row><row _id="row-pihn~q9sc_agxn" _uuid="00000000-0000-0000-0F91-6B800694EF38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pihn~q9sc_agxn"><intent_id>464811</intent_id><project_id>642411</project_id><text_data>Repair existing irrigation system.</text_data><comment_date>2011-07-08T00:00:00</comment_date></row><row _id="row-evhb~wbg4-mdgu" _uuid="00000000-0000-0000-A860-1C455C04FD76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-evhb~wbg4-mdgu"><intent_id>1317218</intent_id><project_id>1049539</project_id><text_data>Whole Proj: The installation of a traffic control signal, roadway lighting, roadway widening, roadway grading, storm drainage, retaining walls, utility relocation, driveway reconstruction, curb &amp; gutter, pedestrian facilities, ADA curb ramps, channelization, signing and landscaping.Our Portion: The beautification of areas adjacent to SR99 and Porter Way through the installation of topsoil, compost, trees, shrubs &amp; groundcovers and seeded lawns &amp; automatic irrigation system.Equip: Mini-Excavator 37hp &amp; Backhoe 70hp (both under the threshold of 90hp for landscape equipment) Hydroseed truck, Dump Truck &amp; hand tools.Other Trucks: KW Equipment Truck &amp; trailer, Chevy Tiltmaster &amp; trailer, Flatbed Truck - all used to haul equipment and materials to jobsite.</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-z7e6.n5y8~xzh8" _uuid="00000000-0000-0000-AF02-2DB7558D2674" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7e6.n5y8~xzh8"><intent_id>641802</intent_id><project_id>709094</project_id><text_data>301731/walker construction</text_data><comment_date>2014-07-17T00:00:00</comment_date></row><row _id="row-vhim-2y3e.ddbf" _uuid="00000000-0000-0000-DBA2-880A1EE71DA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vhim-2y3e.ddbf"><intent_id>791087</intent_id><project_id>721411</project_id><text_data>trucking services only.  project is construction of light rail tunnel from UW to Northgate</text_data><comment_date>2016-09-22T00:00:00</comment_date></row><row _id="row-9ita.krj6-pi8s" _uuid="00000000-0000-0000-0FD0-AC82D7070931" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ita.krj6-pi8s"><intent_id>930329</intent_id><project_id>860471</project_id><text_data>AIP No. 3-53-0040-009-2018 also noted on paperwork.</text_data><comment_date>2018-09-04T00:00:00</comment_date></row><row _id="row-teqk-kgdz-tb75" _uuid="00000000-0000-0000-D65D-7244B8652E93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-teqk-kgdz-tb75"><intent_id>527210</intent_id><project_id>691480</project_id><text_data>082057</text_data><comment_date>2012-08-08T00:00:00</comment_date></row><row _id="row-37b8~crt8.expu" _uuid="00000000-0000-0000-8FB8-EF06A8CFEE24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-37b8~crt8.expu"><intent_id>1200421</intent_id><project_id>992466</project_id><text_data>landscaping to include placement and preparation of topsoil by hand for planting and mounding purposes, 3' depth of fine dark bulk mulch in all new planting areas.</text_data><comment_date>2021-12-20T00:00:00</comment_date></row><row _id="row-x73w~ngrb.82c2" _uuid="00000000-0000-0000-FF2E-F70BD615F97A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x73w~ngrb.82c2"><intent_id>506135</intent_id><project_id>680918</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2012-04-02T00:00:00</comment_date></row><row _id="row-rfnm_nbnc~86qu" _uuid="00000000-0000-0000-0AC2-7DDD32E27808" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rfnm_nbnc~86qu"><intent_id>1269527</intent_id><project_id>1032642</project_id><comment_date>2022-11-23T00:00:00</comment_date></row><row _id="row-vddn~fvdz-ykxt" _uuid="00000000-0000-0000-1A35-51B774B51850" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vddn~fvdz-ykxt"><intent_id>912134</intent_id><project_id>853755</project_id><text_data>1. weatherization2.yes3. 1 or 24. nonoyesnonononononononoyes6. yesnono</text_data><comment_date>2018-06-18T00:00:00</comment_date></row><row _id="row-jgb2-pm2g_thxr" _uuid="00000000-0000-0000-E0FE-ED82E744A709" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgb2-pm2g_thxr"><intent_id>448616</intent_id><project_id>633064</project_id><text_data>Industrial Insurance Account Id: 550,150-00</text_data><comment_date>2011-04-06T00:00:00</comment_date></row><row _id="row-c54q.jy2f~v37q" _uuid="00000000-0000-0000-DF5C-BD3BC51A5E5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c54q.jy2f~v37q"><intent_id>633574</intent_id><project_id>735257</project_id><text_data>Health &amp; Welfare $8.94,  Pension $8.21</text_data><comment_date>2014-06-06T00:00:00</comment_date></row><row _id="row-m6p7_frz9_nusb" _uuid="00000000-0000-0000-249C-FE1D3E53752C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6p7_frz9_nusb"><intent_id>1180287</intent_id><project_id>980737</project_id><text_data>WRI JOB# 21.850 W.O. 46930</text_data><comment_date>2021-09-23T00:00:00</comment_date></row><row _id="row-qzvt~jkg7_8zwr" _uuid="00000000-0000-0000-EBD8-18726E2094F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qzvt~jkg7_8zwr"><intent_id>1011175</intent_id><project_id>886811</project_id><text_data>Filed by Misael Ayala</text_data><comment_date>2019-10-01T00:00:00</comment_date></row><row _id="row-sv76-jn7c_kpev" _uuid="00000000-0000-0000-17D2-C305A57EDDEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sv76-jn7c_kpev"><intent_id>577701</intent_id><project_id>712800</project_id><text_data>Filed by Dan Middleton</text_data><comment_date>2013-07-15T00:00:00</comment_date></row><row _id="row-aj7e.85ze_tpys" _uuid="00000000-0000-0000-0F66-DA0786735119" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aj7e.85ze_tpys"><intent_id>708459</intent_id><project_id>766365</project_id><text_data>Install structured telephone cabling @ Libby Center indoors for classroom remodel</text_data><comment_date>2015-07-20T00:00:00</comment_date></row><row _id="row-dbcn-6scc-2czb" _uuid="00000000-0000-0000-C8F5-8D26C4028B08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dbcn-6scc-2czb"><intent_id>1020887</intent_id><project_id>893925</project_id><text_data>Planting shrubs, clean grass area damage with excavator, topsoil and seeding.</text_data><comment_date>2019-11-10T00:00:00</comment_date></row><row _id="row-ysdt~caqa_r3gr" _uuid="00000000-0000-0000-97B6-D266D5D3C043" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ysdt~caqa_r3gr"><intent_id>1318320</intent_id><project_id>1056768</project_id><text_data>Invoice 164462833</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-jxs9_pgsb.6ifh" _uuid="00000000-0000-0000-48AB-81A3E49A9FAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jxs9_pgsb.6ifh"><intent_id>1256269</intent_id><project_id>1025625</project_id><text_data>repair on electric furnace , single residential family home not used for any other purposes</text_data><comment_date>2022-08-09T00:00:00</comment_date></row><row _id="row-uxpk-pv7h~pykp" _uuid="00000000-0000-0000-3B6F-9F8CF8A2A86B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uxpk-pv7h~pykp"><intent_id>627658</intent_id><project_id>733701</project_id><text_data>044078</text_data><comment_date>2014-05-02T00:00:00</comment_date></row><row _id="row-s59w.kpne.sgfe" _uuid="00000000-0000-0000-0351-FF4AAF7A5517" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s59w.kpne.sgfe"><intent_id>781090</intent_id><project_id>798024</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2016-08-09T00:00:00</comment_date></row><row _id="row-zftt_kmi5.dy6q" _uuid="00000000-0000-0000-63FF-40F506D46B22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zftt_kmi5.dy6q"><intent_id>678132</intent_id><project_id>751569</project_id><text_data>Form filed by:  Kim Burnside</text_data><comment_date>2015-02-06T00:00:00</comment_date></row><row _id="row-vgik~ngda-m2yh" _uuid="00000000-0000-0000-AE55-1539879DC240" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vgik~ngda-m2yh"><intent_id>672856</intent_id><project_id>752221</project_id><text_data>INV# 3006381 PC6  JOB # 6035 CG</text_data><comment_date>2015-01-09T00:00:00</comment_date></row><row _id="row-zmhz-f2rg.btkb" _uuid="00000000-0000-0000-1232-275DD44ECE74" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zmhz-f2rg.btkb"><intent_id>492036</intent_id><project_id>669584</project_id><text_data>1111094</text_data><comment_date>2011-12-05T00:00:00</comment_date></row><row _id="row-3kin~nwyb-wqz9" _uuid="00000000-0000-0000-8AC1-998FD85E0A87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3kin~nwyb-wqz9"><intent_id>740695</intent_id><project_id>775287</project_id><text_data>No employee&amp;#39;s and no subcontractors.  The work to be done by owner.   If changes a revised intent will be filed.</text_data><comment_date>2016-01-07T00:00:00</comment_date></row><row _id="row-exvh.sbc9_wpms" _uuid="00000000-0000-0000-CEAF-86E0179F1580" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-exvh.sbc9_wpms"><intent_id>937853</intent_id><project_id>858673</project_id><text_data>Filed by James Thielman</text_data><comment_date>2018-10-04T00:00:00</comment_date></row><row _id="row-yqqr~gst2~4key" _uuid="00000000-0000-0000-925D-170DA2ABE403" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yqqr~gst2~4key"><intent_id>966383</intent_id><project_id>874241</project_id><text_data>1190033 - Port Townsend High School</text_data><comment_date>2019-03-20T00:00:00</comment_date></row><row _id="row-vf6j_wvui-yi2a" _uuid="00000000-0000-0000-F609-E8E56CF9A5C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vf6j_wvui-yi2a"><intent_id>1009536</intent_id><project_id>884910</project_id><text_data>#1 - Window installation.#2 - Single family homes in the flight path#3 - 1 level home#4 - Homes are owner occupied primary residences#5 - Homes have a kitchen#6 - Homes have a bathroom#7 - No, owner resides on site#8 - No</text_data><comment_date>2019-09-24T00:00:00</comment_date></row><row _id="row-uysx.9yqt~awjb" _uuid="00000000-0000-0000-3FA7-40F1B3F3B5BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uysx.9yqt~awjb"><intent_id>594939</intent_id><project_id>704897</project_id><text_data>Fringe breakdown:Health &amp; welfare		$6.77Pension				$9.95Apprenticeship			  $.63Annuity				$4.00IMPACT				$0.28</text_data><comment_date>2013-09-19T00:00:00</comment_date></row><row _id="row-8559~my6x.a4z8" _uuid="00000000-0000-0000-451D-D5BF310127D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8559~my6x.a4z8"><intent_id>1194618</intent_id><project_id>988846</project_id><text_data>#1 - Kat with a K Landscaping has been contracted to install nine cisterns on the Montridge Arms Apartment complex.#2 - The structure is an apartment complex.#3 - Montridge Arms has a basement, 3 stories, with parking underneath the building (street level).#4 - a) no b) no c) yes d) no e) no f) no g) no h) no i) no j) no k) yes l) no#5 - Yes, each dwelling does have it's own self-contained kitchen.#6 - Yes, each dwelling does have it's own bathroom.#7 - Yes, there is a building manager on-site.#8) - No, no part of the structure is used by members of the public.</text_data><comment_date>2021-11-21T00:00:00</comment_date></row><row _id="row-jyzq_e698~tkcw" _uuid="00000000-0000-0000-E9F7-AC884987FB68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jyzq_e698~tkcw"><intent_id>474506</intent_id><project_id>637089</project_id><text_data>Work to be perfomed will be final seeding with a 75hp Bowie Hydroseed machine</text_data><comment_date>2011-08-25T00:00:00</comment_date></row><row _id="row-aw7c_yg82.z323" _uuid="00000000-0000-0000-35D6-AAB34E9049E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aw7c_yg82.z323"><intent_id>871587</intent_id><project_id>836099</project_id><text_data>No Prevailing Wage rate for Industrial Engine and Machine Mechanics available for the Trade and County.</text_data><comment_date>2017-10-26T00:00:00</comment_date></row><row _id="row-4cwu~zfdx~niza" _uuid="00000000-0000-0000-F88C-727E2BA30184" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4cwu~zfdx~niza"><intent_id>824625</intent_id><project_id>812893</project_id><text_data>Export of brush</text_data><comment_date>2017-04-05T00:00:00</comment_date></row><row _id="row-77bh-pgwm_4rww" _uuid="00000000-0000-0000-C92B-C29AD36BF71A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-77bh-pgwm_4rww"><intent_id>630405</intent_id><project_id>735266</project_id><text_data>Disregard notes from 5/21/2014. Old intent no longer in use. Thank you! - Becca</text_data><comment_date>2015-02-18T00:00:00</comment_date></row><row _id="row-kd4e.kazv_i8fc" _uuid="00000000-0000-0000-DA9D-50D931DB6E6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kd4e.kazv_i8fc"><intent_id>956454</intent_id><project_id>824233</project_id><text_data>0517110</text_data><comment_date>2019-01-23T00:00:00</comment_date></row><row _id="row-cdic-ykfa.q46i" _uuid="00000000-0000-0000-C3E3-E8A6A9082A8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cdic-ykfa.q46i"><intent_id>592342</intent_id><project_id>719462</project_id><text_data>This is the blanket on call for miscellaneous projects for Evergreen School district.  We will file an affidavit upon completion of each individual project monthly.</text_data><comment_date>2013-09-07T00:00:00</comment_date></row><row _id="row-b57a.e8b6.nibu" _uuid="00000000-0000-0000-E7AB-E42E4DE4DB5B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b57a.e8b6.nibu"><intent_id>821699</intent_id><project_id>814897</project_id><text_data>170231</text_data><comment_date>2017-03-20T00:00:00</comment_date></row><row _id="row-mgfk~3bux~qyz7" _uuid="00000000-0000-0000-97AA-5B375A58B56E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mgfk~3bux~qyz7"><intent_id>657784</intent_id><project_id>727605</project_id><text_data>Form filed by: Michael L Sarver</text_data><comment_date>2014-09-30T00:00:00</comment_date></row><row _id="row-5i96~akap.uxj6" _uuid="00000000-0000-0000-D4FC-F6B7FF0B3996" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5i96~akap.uxj6"><intent_id>862259</intent_id><project_id>826918</project_id><text_data>Plumbing Fringe Includes:$9.01 Health&amp; Welfare, $4.56 WA Pension, ,$3.23 National Pension, $1.88 JACT, $.10 ITF, $.10 MCA Dues, $.50 Industy Improvement Fund, $5.5 Vacation, $1.2 Assessment Check OffSheetMetal Journeyman Fringe Includes:$4.24 National Pension, $.17 ITI, $ 7.98 NW Sheet Metal Workers Pension, $12.32NW Health Care, $1.10 Apprenticeship Fund, $.65 Industry Fund, $1.00Organizational Trust Fund, $.79 NW Supplemental Plan, $.07 Clean Card Help</text_data><comment_date>2017-09-12T00:00:00</comment_date></row><row _id="row-a3kb_qdxp_s39u" _uuid="00000000-0000-0000-4243-6DF6CF304750" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a3kb_qdxp_s39u"><intent_id>1113843</intent_id><project_id>911877</project_id><text_data>Milan, 810 S HWY #24, Space F4, Othello</text_data><comment_date>2021-01-07T00:00:00</comment_date></row><row _id="row-5z72.u536-mgpj" _uuid="00000000-0000-0000-891F-96F7AFEA0B64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5z72.u536-mgpj"><intent_id>1318089</intent_id><project_id>1062440</project_id><text_data>SC 230327-0136</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-uj6t~9ma3_ijjz" _uuid="00000000-0000-0000-075D-691AD31CCA08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uj6t~9ma3_ijjz"><intent_id>677757</intent_id><project_id>699258</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2015-02-17T00:00:00</comment_date></row><row _id="row-cgz6-vkpw-3ex5" _uuid="00000000-0000-0000-AA97-8AC5C630D734" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cgz6-vkpw-3ex5"><intent_id>1044956</intent_id><project_id>894616</project_id><text_data>This SOI replaces previous SOI 1022959 filed 11/21/2019.  Our week ending day of week was mis-stated in our subsequent online filing of certified payrolls.  We were told to file a new SOI, file the payrolls and the request that original SOI 1022959 be deleted.</text_data><comment_date>2020-03-12T00:00:00</comment_date></row><row _id="row-q5u5.dc48_8859" _uuid="00000000-0000-0000-E1F3-EE5A9D1AD9F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5u5.dc48_8859"><intent_id>1200769</intent_id><project_id>992683</project_id><text_data>WSP USA Inc. is the prime and will not be performing prevailing wage activity.   WSP USA Inc. is filing this intent due to expected nexus with prevailing wage activity of subconsultant performing some geotechnical drilling as part of consulting advisory services.</text_data><comment_date>2021-12-21T00:00:00</comment_date></row><row _id="row-twzi.skvc.vc2h" _uuid="00000000-0000-0000-F385-CA129E44AC60" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-twzi.skvc.vc2h"><intent_id>1318158</intent_id><project_id>1062481</project_id><text_data>W1527961 - Intent</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-n2vg~e35i~du68" _uuid="00000000-0000-0000-F4D4-4218A63EF1FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2vg~e35i~du68"><intent_id>733186</intent_id><project_id>774033</project_id><text_data>#1. Ductless heat pump.#2. Single family dwelling.#3. 1 level#4. Single family residence a) no b) no c) yes d) no e) no f) no g) no h) no i) no j) no#5. no#6. no#7. no#8. no</text_data><comment_date>2015-11-25T00:00:00</comment_date></row><row _id="row-c37h_ddf2.ymk2" _uuid="00000000-0000-0000-A8C8-1DDFDB0E6174" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c37h_ddf2.ymk2"><intent_id>584983</intent_id><project_id>714662</project_id><text_data>Owner Operated</text_data><comment_date>2013-08-01T00:00:00</comment_date></row><row _id="row-g9d5-njwe.ycwg" _uuid="00000000-0000-0000-1CC0-4BB3F0998919" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g9d5-njwe.ycwg"><intent_id>529507</intent_id><project_id>691599</project_id><text_data>072062</text_data><comment_date>2012-08-20T00:00:00</comment_date></row><row _id="row-xpfy.ecrm-7q2b" _uuid="00000000-0000-0000-40F9-3D223F19C817" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xpfy.ecrm-7q2b"><intent_id>902989</intent_id><project_id>849728</project_id><text_data>***SELF-INSURED***</text_data><comment_date>2018-05-07T00:00:00</comment_date></row><row _id="row-ik2y-xp6t~wfqz" _uuid="00000000-0000-0000-E4C7-03F4F8BA5323" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ik2y-xp6t~wfqz"><intent_id>1130393</intent_id><project_id>955170</project_id><text_data>9862170</text_data><comment_date>2021-03-22T00:00:00</comment_date></row><row _id="row-y9kb-g87a-vhcy" _uuid="00000000-0000-0000-7B9A-9DDEC61D8E92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y9kb-g87a-vhcy"><intent_id>1076854</intent_id><project_id>927551</project_id><text_data>Inside Electrician - Wage $47.85; District 9 $3.92; Edison Pension $8.20; NEBF $1.45; Health &amp; Welfare $10.05; Flex $1.30; Apprenticeship $.80; BLMCC $.20 (total fringe $25.92)?Electronic Technician (Limited Energy) - Wage $38.87; District 9 $1.65; Edison Pension $6.63; NEBF $1.17; Health &amp; Welfare $10.05; Flex $1.30; Apprenticeship $0.75; BLMCC $0.20 (total fringe $21.75)</text_data><comment_date>2020-07-31T00:00:00</comment_date></row><row _id="row-wzg3-fpu7_iqbt" _uuid="00000000-0000-0000-423E-E4AACA0ADB9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wzg3-fpu7_iqbt"><intent_id>868582</intent_id><project_id>792326</project_id><text_data>wo 17721 job 7-014S</text_data><comment_date>2017-10-12T00:00:00</comment_date></row><row _id="row-6gwv-n9rp~zqrs" _uuid="00000000-0000-0000-3C9A-F1F51DF07071" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6gwv-n9rp~zqrs"><intent_id>876165</intent_id><project_id>838032</project_id><text_data>Septic pumping for the Cle Elum  School District.</text_data><comment_date>2017-11-22T00:00:00</comment_date></row><row _id="row-m6zw~skx6_6vd5" _uuid="00000000-0000-0000-E843-285023E22F22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6zw~skx6_6vd5"><intent_id>457050</intent_id><project_id>633265</project_id><text_data>END DUMP TRAILER</text_data><comment_date>2011-05-23T00:00:00</comment_date></row><row _id="row-c7rd_jfzd_eg3f" _uuid="00000000-0000-0000-E797-871AE372D4E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c7rd_jfzd_eg3f"><intent_id>628714</intent_id><project_id>734609</project_id><text_data>Supply Install Geomembrane Products to a oil containment liner system  Welding Equipment.</text_data><comment_date>2014-05-12T00:00:00</comment_date></row><row _id="row-r9hr_qtn5-598q" _uuid="00000000-0000-0000-9D66-98970D6B2781" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9hr_qtn5-598q"><intent_id>1201546</intent_id><project_id>993174</project_id><text_data>Hand / manual work on ground</text_data><comment_date>2021-12-28T00:00:00</comment_date></row><row _id="row-cjjt_f6ck.niqv" _uuid="00000000-0000-0000-566C-1D2B7964F1A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjjt_f6ck.niqv"><intent_id>661349</intent_id><project_id>747032</project_id><text_data>Filed by Jennifer L. Dillon.</text_data><comment_date>2014-10-21T00:00:00</comment_date></row><row _id="row-xrsq-tpt5.a8fe" _uuid="00000000-0000-0000-B602-1416F245B8A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xrsq-tpt5.a8fe"><intent_id>886755</intent_id><project_id>842993</project_id><text_data>1. Replaced the indoor circuits boards for the ductless heat pump.2. Single family dwelling.3. Two4.a) no   b) no   c) yes   d) no   e) no   f) no   g) no   h) no   I) no   j) no5. Yes6. Yes7. No8. No</text_data><comment_date>2018-03-05T00:00:00</comment_date></row><row _id="row-a27w_vkmt-rzjp" _uuid="00000000-0000-0000-2385-59F6B81F28A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a27w_vkmt-rzjp"><intent_id>642695</intent_id><project_id>737772</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2014-07-22T00:00:00</comment_date></row><row _id="row-f6qy-6f7y.n784" _uuid="00000000-0000-0000-74B8-6A6CD84145F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f6qy-6f7y.n784"><intent_id>966251</intent_id><project_id>854883</project_id><text_data>Fringe Rate $28.89: Health $8.17Annuity/Pension $17.65Apprenticeship $.70Impact/Industry $0.27Paid time off  $2.10</text_data><comment_date>2019-03-20T00:00:00</comment_date></row><row _id="row-rm5j.huay.9pw5" _uuid="00000000-0000-0000-42CF-FC80C969A3ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rm5j.huay.9pw5"><intent_id>553918</intent_id><project_id>703860</project_id><text_data>Form Filed By: Ron Pittman</text_data><comment_date>2013-01-29T00:00:00</comment_date></row><row _id="row-yinn_h6vk~v9ye" _uuid="00000000-0000-0000-D794-911ABD2D4B95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yinn_h6vk~v9ye"><intent_id>1233591</intent_id><project_id>1013304</project_id><text_data>304110</text_data><comment_date>2022-05-14T00:00:00</comment_date></row><row _id="row-7qwh-pguv~ekyd" _uuid="00000000-0000-0000-07E8-907A09225479" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7qwh-pguv~ekyd"><intent_id>972222</intent_id><project_id>859471</project_id><text_data>WRS Job #P19-120PW</text_data><comment_date>2019-04-17T00:00:00</comment_date></row><row _id="row-xn3p_h33x~tdyr" _uuid="00000000-0000-0000-3E72-E848BC59DC24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xn3p_h33x~tdyr"><intent_id>866048</intent_id><project_id>816787</project_id><text_data>4.   (a) no, (b) no, (c) yes, (d) no, (e) no, (f) no, (g) no, (h) no (i) no, (j) no, (k) no, (l) no  5.  no6. no7. no     8.  no</text_data><comment_date>2018-12-18T00:00:00</comment_date></row><row _id="row-igwe-97iz_uwcc" _uuid="00000000-0000-0000-EC51-9E4DD43CD1EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-igwe-97iz_uwcc"><intent_id>1224854</intent_id><project_id>1008060</project_id><text_data>9884785</text_data><comment_date>2022-04-12T00:00:00</comment_date></row><row _id="row-epks_2wxs-47ke" _uuid="00000000-0000-0000-DA5D-66BBC83AE99B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-epks_2wxs-47ke"><intent_id>677581</intent_id><project_id>754980</project_id><text_data>this is a JOC filing on an individual job order under Centennial Contractors Ent., Inc.. Job Order Contract 1250220V City of Bellevue</text_data><comment_date>2015-02-03T00:00:00</comment_date></row><row _id="row-6p6c.fbm4.x5at" _uuid="00000000-0000-0000-AD60-8CAEBD5501A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6p6c.fbm4.x5at"><intent_id>692734</intent_id><project_id>744679</project_id><text_data>Filed by Tana GeorgeProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2015-05-05T00:00:00</comment_date></row><row _id="row-y9yq.aham.ktmh" _uuid="00000000-0000-0000-5A25-5B216BA01A5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y9yq.aham.ktmh"><intent_id>919255</intent_id><project_id>649039</project_id><text_data>Filed by Kayhan Fatemi</text_data><comment_date>2018-07-19T00:00:00</comment_date></row><row _id="row-g252_tkr5~b32j" _uuid="00000000-0000-0000-FA59-A8DA3264DE7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g252_tkr5~b32j"><intent_id>1021910</intent_id><project_id>899611</project_id><text_data>#1-We were contracted to fix the furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No</text_data><comment_date>2019-11-15T00:00:00</comment_date></row><row _id="row-k87g-hvpd-723a" _uuid="00000000-0000-0000-3AB0-9CA2054C0F67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k87g-hvpd-723a"><intent_id>590572</intent_id><project_id>718782</project_id><text_data>Job # 172954</text_data><comment_date>2013-08-28T00:00:00</comment_date></row><row _id="row-c52x.2383~g33q" _uuid="00000000-0000-0000-85B4-483957BED7C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c52x.2383~g33q"><intent_id>522134</intent_id><project_id>689175</project_id><text_data>Form filed by: John Martin - petu235</text_data><comment_date>2012-07-13T00:00:00</comment_date></row><row _id="row-jj3a_3tu5~4evh" _uuid="00000000-0000-0000-F321-D4DDAC3401F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jj3a_3tu5~4evh"><intent_id>1238679</intent_id><project_id>1016157</project_id><text_data>sr52274784</text_data><comment_date>2022-06-03T00:00:00</comment_date></row><row _id="row-hurn.5e68-dfs3" _uuid="00000000-0000-0000-5666-22B5C8184F91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hurn.5e68-dfs3"><intent_id>797488</intent_id><project_id>805543</project_id><text_data>Decon Fume hoodsHaz Waste workers to clean fume hood using rags and sponges</text_data><comment_date>2016-10-24T00:00:00</comment_date></row><row _id="row-a28m_ymi3~pgwq" _uuid="00000000-0000-0000-BF53-325FAB8047D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a28m_ymi3~pgwq"><intent_id>1195637</intent_id><project_id>989436</project_id><text_data>Dump Truck is 10 Cubic Yard End Dump + over 12 yrds. to include 20 yrds.Water truck (other truck) is a 4000 gallon tank</text_data><comment_date>2021-11-29T00:00:00</comment_date></row><row _id="row-8566_v32v_4trc" _uuid="00000000-0000-0000-8EBF-54880FA23971" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8566_v32v_4trc"><intent_id>947437</intent_id><project_id>824002</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2018-11-26T00:00:00</comment_date></row><row _id="row-qx9w.kitm.vjim" _uuid="00000000-0000-0000-BEDF-4AF245E58DEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qx9w.kitm.vjim"><intent_id>1071807</intent_id><project_id>921392</project_id><text_data>GrassRoots Irrigation, LLC will maintain the lawns, tree, shrubs, beds, etc. for all specified city properties as directed by Elevation Contracting, LLC</text_data><comment_date>2020-07-13T00:00:00</comment_date></row><row _id="row-77bj-qqj5~r24p" _uuid="00000000-0000-0000-7098-26A8C4FF0729" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-77bj-qqj5~r24p"><intent_id>838263</intent_id><project_id>796904</project_id><text_data>Laborers will demolish and remove piping after disconnect is done by plumbers.Painters will prep and paint existing and new piping after installed by plumbers.</text_data><comment_date>2017-06-05T00:00:00</comment_date></row><row _id="row-4yst-wh3w_q5jm" _uuid="00000000-0000-0000-8FE3-D1C47CB590FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4yst-wh3w_q5jm"><intent_id>820862</intent_id><project_id>815655</project_id><text_data>1)We were contracted to repair the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No</text_data><comment_date>2017-03-15T00:00:00</comment_date></row><row _id="row-pvjh-t6nz_nq7y" _uuid="00000000-0000-0000-7581-8E43A9CCD8F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pvjh-t6nz_nq7y"><intent_id>630185</intent_id><project_id>735175</project_id><text_data>Form filed by: Kiyohiko Sakai</text_data><comment_date>2014-05-16T00:00:00</comment_date></row><row _id="row-dbfe-2txz.4qe8" _uuid="00000000-0000-0000-23E9-AC64D3D0CE50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dbfe-2txz.4qe8"><intent_id>1056765</intent_id><project_id>918380</project_id><text_data>1) - Troubleshoot thermostat and baseboard heater coming on at inappropriate time2) - Apartment3) - Two4) - Low Income Housing, a) No  b) No c) Yes  d) No e) No f) No g) No h) No i) No j) No k) No l) N/A5) - Yes6) - Yes7) - Yes8) - No</text_data><comment_date>2020-05-08T00:00:00</comment_date></row><row _id="row-guky.9fjk-qyn2" _uuid="00000000-0000-0000-BD68-E472A80EBDE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-guky.9fjk-qyn2"><intent_id>741883</intent_id><project_id>782808</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT. IT IS A SINGLE FAMILY, RESIDENTIAL DWELLING. THANK YOU.</text_data><comment_date>2016-01-15T00:00:00</comment_date></row><row _id="row-mc94.qfsh~9g2n" _uuid="00000000-0000-0000-5F12-02884020957A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mc94.qfsh~9g2n"><intent_id>890345</intent_id><project_id>844649</project_id><text_data>The above notes were put in from a previous job.  We were told to put this in each time so you know that we understand the difference between labor and landscape labor.  Ridgetop, Inc. will be spreading and placing topsoil to finish restoration to Legion Golf Course fairway after General Contractor has done their part in the storm water detention project and earthwork measures.  Our subs will be doing drainage and irrigation and seeding of area.  Ridgetop, Inc. will construct 6 new Bunkers with sodding and sand.  Replanting Greens and Tees and Fairways.  This will all be done by hand with shovel and rake and small landscape equipment.</text_data><comment_date>2018-02-28T00:00:00</comment_date></row><row _id="row-5b6g~7vf7-82ma" _uuid="00000000-0000-0000-B23D-A4E7207889EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5b6g~7vf7-82ma"><intent_id>582974</intent_id><project_id>715361</project_id><text_data>install new irrigation heads &amp; pipe to a depth not greater than 3. Install new sod.</text_data><comment_date>2013-07-23T00:00:00</comment_date></row><row _id="row-zrmc.vpe2-4fg4" _uuid="00000000-0000-0000-7BB6-DBA4A2A1E25B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zrmc.vpe2-4fg4"><intent_id>794194</intent_id><project_id>804301</project_id><text_data>Filed by Linnie Shaver</text_data><comment_date>2016-10-05T00:00:00</comment_date></row><row _id="row-q7ca.5aye~u66e" _uuid="00000000-0000-0000-49C2-8EC2331DA923" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q7ca.5aye~u66e"><intent_id>901530</intent_id><project_id>845804</project_id><text_data>we will be providing and installing all ew topsoil compost bark new plantings of shrubs trees and groundcovers and irrigation</text_data><comment_date>2018-04-30T00:00:00</comment_date></row><row _id="row-9frs-k6bk.x8f6" _uuid="00000000-0000-0000-65DD-BD5EC6D3612C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9frs-k6bk.x8f6"><intent_id>603136</intent_id><project_id>692967</project_id><text_data>we have workers comp insurance in Oregon with liberty northwest</text_data><comment_date>2013-11-05T00:00:00</comment_date></row><row _id="row-be8g_98c6~xzts" _uuid="00000000-0000-0000-7F93-7AEF8516060D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-be8g_98c6~xzts"><intent_id>1318477</intent_id><project_id>1062646</project_id><text_data>9914950</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-cuhw-db78~gfub" _uuid="00000000-0000-0000-22A3-22CE01EDF607" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cuhw-db78~gfub"><intent_id>940907</intent_id><project_id>862554</project_id><text_data>general labor</text_data><comment_date>2018-10-19T00:00:00</comment_date></row><row _id="row-u5bc-9sv8_kqxk" _uuid="00000000-0000-0000-351A-B7BDCD5ED768" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u5bc-9sv8_kqxk"><intent_id>1000069</intent_id><project_id>882617</project_id><text_data>We subcontract owner/operator truck drivers to move modular buildings using their own truck and modular trailers from one location to another.</text_data><comment_date>2019-08-15T00:00:00</comment_date></row><row _id="row-zi8r-ex5m.m6ac" _uuid="00000000-0000-0000-0A55-C5A31AD260A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zi8r-ex5m.m6ac"><intent_id>587789</intent_id><project_id>716645</project_id><text_data>Job address:1714 W. Gordon, Spokane, WA 99205 $1401512 S. Magnolia, Spokane, WA 99203 $602122 E. Decatur, Spokane, WA 99208 $60Total for this listing: $260</text_data><comment_date>2013-08-14T00:00:00</comment_date></row><row _id="row-cgx3~wec5.4yk5" _uuid="00000000-0000-0000-5647-45B0481DA9D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cgx3~wec5.4yk5"><intent_id>773738</intent_id><project_id>796580</project_id><text_data>Using a 4 gallon hand pump backpack sprayer.  Spot spray invasive weeds along levees.</text_data><comment_date>2016-07-11T00:00:00</comment_date></row><row _id="row-jrvr~hm4k.5kdw" _uuid="00000000-0000-0000-1D54-F3301DC5B957" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jrvr~hm4k.5kdw"><intent_id>603673</intent_id><project_id>689324</project_id><text_data>Disregard above note regarding fringe benefits. All monies were paid in hourly wages.</text_data><comment_date>2013-11-20T00:00:00</comment_date></row><row _id="row-qkgi~jkpb.7bcn" _uuid="00000000-0000-0000-9B5E-16976A4C820A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qkgi~jkpb.7bcn"><intent_id>805421</intent_id><project_id>808570</project_id><text_data>#1 Replace bath fan. #2 Single family dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2016-12-04T00:00:00</comment_date></row><row _id="row-kixs-9wyr~ed7v" _uuid="00000000-0000-0000-8A90-770C642CAB38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kixs-9wyr~ed7v"><intent_id>957683</intent_id><project_id>871387</project_id><text_data>Install irrigation system to a depth between 12' and 18' using a mini excavator.Install topsoil and bark using a skid steer and hand tools.Install trees, plants and shrubs using hand tools.Install ground cover plants by hand.</text_data><comment_date>2019-01-29T00:00:00</comment_date></row><row _id="row-uwfh~jt3m~av4p" _uuid="00000000-0000-0000-C0B6-22A153BE5502" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwfh~jt3m~av4p"><intent_id>636079</intent_id><project_id>737470</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborer Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2014-06-19T00:00:00</comment_date></row><row _id="row-pt5w~cjgh-99b7" _uuid="00000000-0000-0000-EBF4-C85205881406" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pt5w~cjgh-99b7"><intent_id>556057</intent_id><project_id>704849</project_id><text_data>SHIRLEY NELSON20702 131 ST CT EBONNEY LAKE WA 98381</text_data><comment_date>2013-02-13T00:00:00</comment_date></row><row _id="row-p27m-p4sv.844v" _uuid="00000000-0000-0000-1464-2D919E0EF935" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p27m-p4sv.844v"><intent_id>1237796</intent_id><project_id>1015674</project_id><text_data>P22-YCFS 1 Year Contract</text_data><comment_date>2022-06-01T00:00:00</comment_date></row><row _id="row-y7ve_xp4d_d4p6" _uuid="00000000-0000-0000-7361-4D7A215771DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y7ve_xp4d_d4p6"><intent_id>860727</intent_id><project_id>826002</project_id><text_data>Fringe consists of $12.83 Medical and $5.04 Pension.</text_data><comment_date>2017-09-05T00:00:00</comment_date></row><row _id="row-wdpy-72vq-7jgj" _uuid="00000000-0000-0000-235B-69844B143386" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wdpy-72vq-7jgj"><intent_id>965514</intent_id><project_id>874904</project_id><text_data>'Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.'</text_data><comment_date>2019-03-15T00:00:00</comment_date></row><row _id="row-jptq_tb4k~ey4p" _uuid="00000000-0000-0000-2701-7692DDA31E17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jptq_tb4k~ey4p"><intent_id>1465521</intent_id><project_id>1139678</project_id><text_data>Workers' Compensation Account ID is not applicable. JEX is a Tribal Corporation that self-insures through Brown and Brown.</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-wbcx-jcf8_jq9z" _uuid="00000000-0000-0000-6882-7FBC3967D3A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wbcx-jcf8_jq9z"><intent_id>475988</intent_id><project_id>669092</project_id><text_data>Our duties for this project were to bring playground material in our truck to the facility(s) where everything was marked and ready for our guy (landscape construction) to take a hose and blow product on the playground where they told us.  No other tools, etc. are used.Next, the breakdown for the prevailing wage fringe (truck driver) are as follows:Vacation $.31, Holiday $.37, Life Insurance $.02, Dental Insurance $.68, Medical Insurance $5.20,Training $.58 = Total Fringe $7.16Our previous calculation was done by someone not familiar with how the calculation is formed.</text_data><comment_date>2011-09-27T00:00:00</comment_date></row><row _id="row-hana~wzvw-5cec" _uuid="00000000-0000-0000-2C02-B885D4AAFDAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hana~wzvw-5cec"><intent_id>1258602</intent_id><project_id>1026808</project_id><text_data>This walk in cooler had been not working for a period of time.  Consequently, foods were spoiled.  School district employees disposed of the spoiled foods.  One of our people to make necessary repairs to the freezer.  Another one of our people to clean and sanitized the inside of the cooler prior to putting more food back in.</text_data><comment_date>2022-08-31T00:00:00</comment_date></row><row _id="row-gzmf.f9e5_7hb7" _uuid="00000000-0000-0000-9794-15C2AC29A480" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzmf.f9e5_7hb7"><intent_id>944095</intent_id><project_id>850162</project_id><text_data>Labor and materials for installation of low-voltage telecommunications cabling inside a school building for the purpose of networking personal computers.</text_data><comment_date>2018-11-05T00:00:00</comment_date></row><row _id="row-udwv_4jv9~4jqb" _uuid="00000000-0000-0000-9AF4-74A7A6FC4819" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-udwv_4jv9~4jqb"><intent_id>961824</intent_id><project_id>850965</project_id><text_data>The work include placement of topsoil and planting</text_data><comment_date>2019-02-22T00:00:00</comment_date></row><row _id="row-uqgk_epfg_vaxn" _uuid="00000000-0000-0000-1093-73B2E0A90DA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uqgk_epfg_vaxn"><intent_id>1258630</intent_id><project_id>1026827</project_id><text_data>Invoice #553291 $5286.37</text_data><comment_date>2022-08-16T00:00:00</comment_date></row><row _id="row-kvmb~jcky.bix2" _uuid="00000000-0000-0000-FAD9-50653FFF7034" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvmb~jcky.bix2"><intent_id>1281302</intent_id><project_id>1039493</project_id><text_data>#1 � The crew will be replacing panels, upgrading service and installing heat pump system.#2 - Singe-Family #3 � 2-Stories or Less#4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2022-11-04T00:00:00</comment_date></row><row _id="row-9bb6-vwsy-4thb" _uuid="00000000-0000-0000-B8FB-0A8C586734B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9bb6-vwsy-4thb"><intent_id>1195720</intent_id><project_id>855643</project_id><text_data>Manually planted seed/hydroseeded</text_data><comment_date>2022-01-10T00:00:00</comment_date></row><row _id="row-6mhj-usw5-c2vv" _uuid="00000000-0000-0000-AF7E-654A160D69D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6mhj-usw5-c2vv"><intent_id>1243853</intent_id><project_id>1019079</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors</text_data><comment_date>2022-07-12T00:00:00</comment_date></row><row _id="row-hg9f_btra.6fvp" _uuid="00000000-0000-0000-26BF-13A1A613E921" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hg9f_btra.6fvp"><intent_id>1114114</intent_id><project_id>945941</project_id><text_data>Additional information added 1/28/2021, please let me know if you are seeking specific information in responseA) Entire project: Perform repairs to scrubber ducting at Anacortes Waste Water Treatment Plant per instructions from City of Anacortes; in shop-fabricate 1/4' A36 steel cladding pieces, at site-install cladding pieces over cone and two (2) elbows at customer site per contract 20-226-SEW-002B) Superior Systems, Inc. is the only contractor working on this project under contract 20-226-SEW-002C) Duties performed by Millwright Laborers and tools, equipment, vehicles used:At customer site, used cutting torches to dismantle and remove damaged patched steel material from ductingUsed welders to install replacement cladding pieces in place over cone and elbows, welding all seams to secureUsed welders, cutting torches, measuring tape, and service truck at customer site</text_data><comment_date>2021-01-29T00:00:00</comment_date></row><row _id="row-jv8b-zz89~g459" _uuid="00000000-0000-0000-8A4C-A955989F42D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jv8b-zz89~g459"><intent_id>912673</intent_id><project_id>853932</project_id><text_data>KCDA</text_data><comment_date>2018-06-20T00:00:00</comment_date></row><row _id="row-7a38-9vfq-zm6y" _uuid="00000000-0000-0000-1A8D-6C965039D99A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7a38-9vfq-zm6y"><intent_id>795386</intent_id><project_id>804732</project_id><text_data>1) Weatherization work for KCHA2) Yes3) 14)a) Nob) Noc) Yesd) Noe) Nof) Nog) Noh) Noi) Noj) Nok) No5) Yes6) Yes7) No8) No</text_data><comment_date>2016-10-12T00:00:00</comment_date></row><row _id="row-wa9p_urt5~87p6" _uuid="00000000-0000-0000-258E-59067CB81174" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wa9p_urt5~87p6"><intent_id>640723</intent_id><project_id>739195</project_id><text_data>All work subtiered out</text_data><comment_date>2014-07-14T00:00:00</comment_date></row><row _id="row-bjsg~bskz-nedz" _uuid="00000000-0000-0000-4175-F5B612749A3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjsg~bskz-nedz"><intent_id>1115733</intent_id><project_id>932135</project_id><text_data>0921503</text_data><comment_date>2021-01-18T00:00:00</comment_date></row><row _id="row-ju3a_r2bh~43pc" _uuid="00000000-0000-0000-F567-AE780D632CEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ju3a_r2bh~43pc"><intent_id>662158</intent_id><project_id>747374</project_id><text_data>68th Ave NE, Kenmore1. Crawl Install	2. Apartment		3. 2		4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No		5. Yes		6. Yes		7. Yes		8. No</text_data><comment_date>2014-10-24T00:00:00</comment_date></row><row _id="row-qnec_fpau~ss2n" _uuid="00000000-0000-0000-9B8A-3C7B952B3F17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qnec_fpau~ss2n"><intent_id>1043910</intent_id><project_id>911551</project_id><text_data>2019</text_data><comment_date>2020-03-09T00:00:00</comment_date></row><row _id="row-ei23.i57a_qxsx" _uuid="00000000-0000-0000-E09C-09DFD872C034" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ei23.i57a_qxsx"><intent_id>1205502</intent_id><project_id>927149</project_id><text_data>Oldcastle infrastructure believes that the work and hours described in this intent to pay prevailing wage and/or affidavit of wages paid is not subject to payment of prevailing wage. Oldcastle precast's filing of an intent to pay prevailing wage and/or affidavit of wages paid may not be construed in any manner whatsoever as an acknowledgement or agreement that the work and hours described therein are subject to payment of prevailing wage.</text_data><comment_date>2022-01-19T00:00:00</comment_date></row><row _id="row-5yk2.bs3m-xe6m" _uuid="00000000-0000-0000-7762-4416ED10C0D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5yk2.bs3m-xe6m"><intent_id>468337</intent_id><project_id>665285</project_id><text_data>Not hiring any staff. Doing the work myself as owner operator.</text_data><comment_date>2011-07-26T00:00:00</comment_date></row><row _id="row-uspz.uzpi_pne9" _uuid="00000000-0000-0000-A88C-002D4283E891" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uspz.uzpi_pne9"><intent_id>963216</intent_id><project_id>846551</project_id><text_data>FILED BY MIKE BOYDQUESTIONS FOR MANUALL FILING INTENT FOR EXEMPT EMPLOYEES-----------------------------------------------------------------------------1. What is the specific purpose of this awarding agency�s public works project?Electrical Upgrades to primary distribution2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?Not by Electrical Reliability Services, Inc.3. Does this project entail the remodeling or new construction of a facility?No4. If your firm is working upon a type of building system, what type of system is involved?No building. Our project was to test outdoor primary distribution cable at the Cell Phone Lot substation. 5. What specific tasks will your employees perform? Perform a high potential test on 3 each 15KV cables. This will require a high voltage test cable by hand to the distribution cables being tested using an alligator clip. A ground return lead will be connected between the test set and a known ground. High Voltage d.c. will be applied in 8-5,000 volt increments until 40,000 volts is reached. 40,000 volts will be held for 15 minutes and leakage current will be recorded on a data sheet on a computer. A report will be written at a later date. 6. Will your employee&amp;#39;s work require the physical modification to the electrical system wiring including connection and disconnection, temporary or permanent?? No, our work is performed on terminated cable prior to it being connected by Foy electricians. 7. Will your employees require the use of a screwdriver, wrench or any other handheld tool besides a multimeter?? No.8. If your employees use no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? Only to connect test cables from the high potential test set to the distribution cables being tested via alligator clips. 9. Will your employees perform any work that requires and electrical license or certification under Chapter 296-46B WAC?? No.10. Are you going to be hiring any subcontractors for this project? No.</text_data><comment_date>2019-03-04T00:00:00</comment_date></row><row _id="row-jb4n.gu3b~ekg3" _uuid="00000000-0000-0000-73F2-3A7F9CD2D827" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jb4n.gu3b~ekg3"><intent_id>530926</intent_id><project_id>694153</project_id><text_data>This job will consist of irrigation, top soil placement and planting of trees and shrubs. Irrigation depth will 18&amp;quot; and the trenches will be dug by hand. We will be using a light duty skid steer bobcat for topsoil placement. We will first install irrigation, next we will place the topsoil and last we will be planting the trees and shrubs.</text_data><comment_date>2012-08-27T00:00:00</comment_date></row><row _id="row-5mbk_rxw5~5yng" _uuid="00000000-0000-0000-55B9-2A4E918C5ABC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5mbk_rxw5~5yng"><intent_id>684520</intent_id><project_id>738896</project_id><text_data>WCISA: .06, Pension 8.80, Health and Welfare: 6.14, Apprentice: .60, LMCI: .10 Total: $15.70</text_data><comment_date>2015-03-19T00:00:00</comment_date></row><row _id="row-4438_86ut-x6mk" _uuid="00000000-0000-0000-9A81-62756F9C7664" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4438_86ut-x6mk"><intent_id>1215574</intent_id><project_id>1002139</project_id><text_data>SR51253084</text_data><comment_date>2022-03-04T00:00:00</comment_date></row><row _id="row-mqh8~cv58_d6rm" _uuid="00000000-0000-0000-317D-7878B706FE06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mqh8~cv58_d6rm"><intent_id>598734</intent_id><project_id>721767</project_id><text_data>Filed by Michael Hummel.</text_data><comment_date>2013-10-10T00:00:00</comment_date></row><row _id="row-spe9_ks43-svit" _uuid="00000000-0000-0000-59C3-9A7291F770AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-spe9_ks43-svit"><intent_id>634614</intent_id><project_id>559384</project_id><text_data>Form filed by: Christine Fitzpatrick</text_data><comment_date>2014-06-12T00:00:00</comment_date></row><row _id="row-7qvu_mrqj.zi9b" _uuid="00000000-0000-0000-2A76-BD7C2E3C27C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7qvu_mrqj.zi9b"><intent_id>835915</intent_id><project_id>822505</project_id><text_data>WO #8025327</text_data><comment_date>2017-05-24T00:00:00</comment_date></row><row _id="row-aqdx-r3zz-s4c9" _uuid="00000000-0000-0000-08FB-F83A7FBDB46D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aqdx-r3zz-s4c9"><intent_id>932351</intent_id><project_id>840705</project_id><text_data>IGT CONSTRUCTION PERFORMED THE FOLLOWING: INSTALLED AND REPAIRED IRRIGATION SPRINKLERS, VALVES, PIPE AND FITTINGS, EXCAVATION, CLEARING AND GRUBBING. INSTALLING WEED BARRIER CLOTH TO ASSIGNED FLOWERBEDS, USED COMPACTED CRUSHED 4� DEEP BASALT, COMPACTED 4� DEEP SALMON CHIP, COMPACTED 4� DEEP RAINBOW RIVER ROCK FOR FLOWERBED ESTABLISHED COVER. USED A ROCK SLINGER TO INSTALL ROCK COVER. 6 FOOT TO 10 FOOT TRENCH 10 INCHES TO 12 INCHES DEEP EXCAVATION AND BACKFILL VIA SHOVELS FOR IRRIGATION REPAIR. REPLACED VALVE BOX LID AND INSTALLED BASALT BENCHES.  INSTALLED TWO RAIL CEDAR FENDING 510 LINEAR FEET. OTHER WORK WAS NOT COMPLETED BY IGT CONSTRUCTION.IGT DID NOT SUBCONTRACT OR INSTALL CEMENT CURBING, HYDRO SEEDING, OR WALK PATHS.</text_data><comment_date>2018-10-03T00:00:00</comment_date></row><row _id="row-xnt3.ns99-n4x8" _uuid="00000000-0000-0000-57B6-25366BBC25E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xnt3.ns99-n4x8"><intent_id>1000535</intent_id><project_id>858867</project_id><text_data>MMFS Job#76199146/West Tiger</text_data><comment_date>2019-08-19T00:00:00</comment_date></row><row _id="row-2hff_9aag.j8fv" _uuid="00000000-0000-0000-8DD4-A46BAC8EC543" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2hff_9aag.j8fv"><intent_id>1153786</intent_id><project_id>963625</project_id><text_data>Icon job# 521308TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2021-06-18T00:00:00</comment_date></row><row _id="row-ax6d-exu3.5s47" _uuid="00000000-0000-0000-E8CD-EADF6D9FACB4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ax6d-exu3.5s47"><intent_id>995226</intent_id><project_id>888455</project_id><text_data>We are installing sound masking emitters and then connecting Cat5e cable to them.  All work is inside the building.</text_data><comment_date>2019-07-29T00:00:00</comment_date></row><row _id="row-g7m2.i5ns_gw5x" _uuid="00000000-0000-0000-59A7-B643B1C8A4E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g7m2.i5ns_gw5x"><intent_id>1082059</intent_id><project_id>929886</project_id><text_data>The trucks driven will be a F-550 flatbed that will transport material, E-350 to transport employees while on site, and 2-Chevy 2500s that will be used to move material.Ironworker:  Annuity $8.15, Health &amp; Welfare $9.98, Pension $11.95, Apprenticeship $0.80, IMPACT $0.24, Industry $0.01, Helmets to HH $0.05, Tax $0.65Plumbers &amp; Pipefitters:  Health &amp; Welfare $13.79, National Pension $4.59, State Pension $6.52, Supplemental Pension $7.94, ITF/JATC $2.45, LMCCT $0.33, CMRAVE $0.05, Tax $6.94Boilermakers:  Pension $16.53, Welfare $9.31, Annuity $1.63, Apprentice $1.63, MOST $0.37, WSBIF $0.16, CMRave $0.05, Tax $2.68</text_data><comment_date>2020-08-25T00:00:00</comment_date></row><row _id="row-xb5h~uaq8~va5q" _uuid="00000000-0000-0000-DF2B-4E52FB1D76AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xb5h~uaq8~va5q"><intent_id>629064</intent_id><project_id>719399</project_id><text_data>Christensen Inc. GC is filing on behalf of K&amp;A Masonry due to ceased operations.</text_data><comment_date>2014-05-12T00:00:00</comment_date></row><row _id="row-xi4b.b3uy-sb5s" _uuid="00000000-0000-0000-9392-026707462965" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xi4b.b3uy-sb5s"><intent_id>1116343</intent_id><project_id>947070</project_id><text_data>Excavate trench from Grant County Courthouse annex to First Ave NW. 8-inch cast-iron storm sewer pipe 60 years old cracked in foundation wall and was crushed beneath a section of now buried roadway that once connected D St between First Ave and West Division. The pipe was almost flat and was half full of Mt. St. Helens ash. Grant County Commissioners approved an emergency resolution to waive state competitive bidding requirements in order to retain local companies which expedited replacement of the failed sewer line.</text_data><comment_date>2021-01-20T00:00:00</comment_date></row><row _id="row-majp.yjwr~esca" _uuid="00000000-0000-0000-2698-B6A4BFE2E749" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-majp.yjwr~esca"><intent_id>835916</intent_id><project_id>822506</project_id><text_data># 90503</text_data><comment_date>2017-05-24T00:00:00</comment_date></row><row _id="row-359i_mkb9-z33g" _uuid="00000000-0000-0000-6F33-293ED0610B68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-359i_mkb9-z33g"><intent_id>763769</intent_id><project_id>792669</project_id><text_data>Filed by Lance Aschinger</text_data><comment_date>2016-05-23T00:00:00</comment_date></row><row _id="row-i7tg.dq4c~6z3q" _uuid="00000000-0000-0000-D270-3D1C9E214077" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7tg.dq4c~6z3q"><intent_id>1011943</intent_id><project_id>895149</project_id><text_data>Specific tasks: End of project tree tube removal</text_data><comment_date>2019-10-03T00:00:00</comment_date></row><row _id="row-ppmq_63ry_gk46" _uuid="00000000-0000-0000-C6FE-545DB602B656" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ppmq_63ry_gk46"><intent_id>1262304</intent_id><project_id>1028653</project_id><text_data>Other truck is a 4000 gallon water truck</text_data><comment_date>2022-08-29T00:00:00</comment_date></row><row _id="row-989v-5zkk_8r57" _uuid="00000000-0000-0000-A4C2-515761624DA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-989v-5zkk_8r57"><intent_id>925138</intent_id><project_id>858088</project_id><text_data>Our general laborers unload and distribute cabinets from our delivery truck to various rooms on the jobsite.  The only tools used are hand trucks and rolling carts.Our trucks are 14� and 26� box trucks for delivery of cabinets.</text_data><comment_date>2018-08-13T00:00:00</comment_date></row><row _id="row-px7u.fv37~57hk" _uuid="00000000-0000-0000-B024-BBF53653B4E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-px7u.fv37~57hk"><intent_id>920793</intent_id><project_id>856591</project_id><text_data>Russell Landscaping is responsible for moving sprinkler lines to new, designated location. A temporary sprinkler system will be installed in designated area where trenching will not exceed 12&amp;quot; to accommodate new dryland hydroseed using Bowie hydroseed machine. Once dryland hydroseed has been established, temporary sprinkler system will be removed. 96 yards of topsoil will be installed around perimeter of asphalt and blend to existing grass to accommodate the grade change. Russell Landscaping will use Bobcat track loader, wheelbarrows and shovels to install top soil.  Concrete curbing will be installed around designated areas using Tygar curbing machine to give finishing touch.</text_data><comment_date>2018-07-25T00:00:00</comment_date></row><row _id="row-6ygd-drqe-ga6r" _uuid="00000000-0000-0000-4F99-A9F18A4858E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ygd-drqe-ga6r"><intent_id>786418</intent_id><project_id>796477</project_id><text_data>This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-ptsw-dkj9-zm4q" _uuid="00000000-0000-0000-C0D6-A6DFBFF0B15A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ptsw-dkj9-zm4q"><intent_id>531280</intent_id><project_id>694810</project_id><text_data>082063</text_data><comment_date>2012-08-28T00:00:00</comment_date></row><row _id="row-e3w3~uzq5.88cs" _uuid="00000000-0000-0000-0338-63088F9927EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e3w3~uzq5.88cs"><intent_id>913193</intent_id><project_id>824939</project_id><text_data>L2 Job No. 170704</text_data><comment_date>2018-06-22T00:00:00</comment_date></row><row _id="row-68ky_dj62.usmz" _uuid="00000000-0000-0000-1BDD-2EF4D9AE7283" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-68ky_dj62.usmz"><intent_id>1177078</intent_id><project_id>979056</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2021-09-13T00:00:00</comment_date></row><row _id="row-2f2v-iq86.b7bh" _uuid="00000000-0000-0000-2BE1-B96DEE7E0A4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2f2v-iq86.b7bh"><intent_id>1264690</intent_id><project_id>929587</project_id><text_data>The application of a select Herbicide for the elimination of existing weeds. One(1) Washington State licensed Commercial Operator will apply the selected Herbicides by hand spray and boom spray attached to Kubota UTV. Approximately 17,000 - 18,000 square feet is to be treated is located at I-90, MP 295.15 TO MP 296.45.</text_data><comment_date>2022-09-07T00:00:00</comment_date></row><row _id="row-mcrw_uf98~dwtm" _uuid="00000000-0000-0000-46B2-FA6BB791C3AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mcrw_uf98~dwtm"><intent_id>772405</intent_id><project_id>796047</project_id><text_data>Install Fertile Mulch into landscape beds.</text_data><comment_date>2016-07-04T00:00:00</comment_date></row><row _id="row-mgr2-r7gi_j83k" _uuid="00000000-0000-0000-3C0E-D20E7D4DF2D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mgr2-r7gi_j83k"><intent_id>771847</intent_id><project_id>790196</project_id><text_data>GARY REED &amp; SONS LLC  THIS COMPANY IS A DUMP TRUCKING COMPANY ---- OWNER GARY REED , JOE REED ,</text_data><comment_date>2016-06-29T00:00:00</comment_date></row><row _id="row-65pf-fc7p.p85q" _uuid="00000000-0000-0000-1268-2A21C34FDEA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-65pf-fc7p.p85q"><intent_id>801015</intent_id><project_id>807061</project_id><text_data>Job Order Contract (JOC)  Construction Services for Facilities Maintenance and OperationsContract No. RTA/CN 0164-15Work Order No.  001 - CCE 73470-0013</text_data><comment_date>2016-11-10T00:00:00</comment_date></row><row _id="row-9z5g_jep4_w3uy" _uuid="00000000-0000-0000-3BD3-A29A19D4BBEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9z5g_jep4_w3uy"><intent_id>517378</intent_id><project_id>689804</project_id><text_data>Filed by: Liz Felder</text_data><comment_date>2012-06-18T00:00:00</comment_date></row><row _id="row-qznx-tuyk~fmjc" _uuid="00000000-0000-0000-A475-78752D0B6B38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qznx-tuyk~fmjc"><intent_id>469440</intent_id><project_id>671315</project_id><text_data>This contract is for Landscape Maintenance at multiple sites in the city of Bellevue. This project to consist of mowing, trimming, edging, bed care, pruning &amp; leaf fall removal on the sites. Equipment to be used includes walk behind lawnmowers, weed eaters, pruning shears, back pack blowers, rakes, shovels, buckets &amp; hoes as required to complete the maintenance of the established planting &amp; turf areas for these City of Bellevue sites.This service is on a set schedule weekly from March 1 through October 31 and bi-weekly for the months of January &amp; February/November &amp; December.</text_data><comment_date>2011-08-01T00:00:00</comment_date></row><row _id="row-hvzn-i8vm~6bjw" _uuid="00000000-0000-0000-9392-298DA32B9194" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hvzn-i8vm~6bjw"><intent_id>647640</intent_id><project_id>730181</project_id><text_data>From: Tami Hill [mailto:bettersidebookkeeping@live.com] Sent: Thursday, September 18, 2014 8:18 AMTo: Herman, Laura E (LNI)Subject: Intent No. 647640Please see below:I forgot to give you the note to add to your Intent for the Edmonds project. The note below needs to be added to your Intent. The L&amp;I will do it without charging your account again. Please send the below note and your Intent number to Laura Herman at herq235@LNI.WA.GOV. This is a KCDA piggyback contract. The contract awarding agency for this work is Edmonds School District (not KCDA). The contract contact at Edmonds School District is:Jane CookePublic Works Contract CoordinatorEdmonds School District20420 68th Avenue WLynnwood, WA  98036425-431-7058    Fax  425-431-7070cookej@edmonds.wednet.eduTami HillBetterside Bookkeeping425-218-0052425-955-0606 faxCircular 230 Notice: To comply with IRS rules, we must inform you that this message and any attachments, if they contain advice relating to federal taxes, were not intended or written to be used, and cannot be used, for the purpose of avoiding penalties that may be imposed under federal tax law.Under these rules, a taxpayer may rely on professional advice to avoid federal tax penalties only if the advice is reflected in the comprehensive written tax opinion that conforms to specific requirements under federal law.The information contained in this electronic message is legally privileged and/or confidential and intended for the use of the individual or entity named above. If you are not the intended recipient, you are hereby notified that any use, dissemination, distribution, or copying of this electronic message or its contents is strictly prohibited. If you have received this message in error, please immediately respond to this message and destroy the original communication without making a copy.</text_data><comment_date>2014-09-18T00:00:00</comment_date></row><row _id="row-dv5q_wka3.t3ct" _uuid="00000000-0000-0000-741E-11BC43977772" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dv5q_wka3.t3ct"><intent_id>535715</intent_id><project_id>695098</project_id><text_data>Filed by Gary Liles</text_data><comment_date>2012-09-20T00:00:00</comment_date></row><row _id="row-naid~mgyw-pcjy" _uuid="00000000-0000-0000-D170-607624C710A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-naid~mgyw-pcjy"><intent_id>811500</intent_id><project_id>763048</project_id><text_data>filed by Wendy Mascarenas</text_data><comment_date>2017-01-17T00:00:00</comment_date></row><row _id="row-fu95_aq8i~dvc2" _uuid="00000000-0000-0000-35AD-E306FFCF2BD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fu95_aq8i~dvc2"><intent_id>814103</intent_id><project_id>809607</project_id><text_data>Seeding and mulching</text_data><comment_date>2017-02-22T00:00:00</comment_date></row><row _id="row-99v7.9cjs_sdrt" _uuid="00000000-0000-0000-BDA3-95D950EE506D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-99v7.9cjs_sdrt"><intent_id>762263</intent_id><project_id>792037</project_id><text_data>I am in charge of mowing &amp; cutting the edge of the lawn areas blowing the grass debris off of the sidewalk &amp; path ways. My two employees are in charge of pulling weeds out from the flower bed, raking up the leaves, fluffling up the bark &amp; trimming the bushes with small clippers and pruning the trees with the ladder &amp; loppers.</text_data><comment_date>2016-06-20T00:00:00</comment_date></row><row _id="row-vfjc.45k4.m8qi" _uuid="00000000-0000-0000-7DDC-6761B5A1165C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfjc.45k4.m8qi"><intent_id>816659</intent_id><project_id>812703</project_id><text_data>Wages 1580 Main St #8 98248Nichols 2902 Cowgill Ave 98225James 968 Ferry Ave 98239JM Electric is contracted for all electrical work. All residences are single family dwellings.</text_data><comment_date>2017-02-17T00:00:00</comment_date></row><row _id="row-v8fv.uvcf.ncwc" _uuid="00000000-0000-0000-AB6B-E8BE10F6AAE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8fv.uvcf.ncwc"><intent_id>689277</intent_id><project_id>760053</project_id><text_data>&amp;quot;Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.&amp;quot;</text_data><comment_date>2015-04-15T00:00:00</comment_date></row><row _id="row-xcfn-emvf_2hpj" _uuid="00000000-0000-0000-588D-95481E223DA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xcfn-emvf_2hpj"><intent_id>1205825</intent_id><project_id>996021</project_id><text_data>9876085</text_data><comment_date>2022-01-19T00:00:00</comment_date></row><row _id="row-dmxb~qsjv_72md" _uuid="00000000-0000-0000-C578-82DCE7B5F077" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dmxb~qsjv_72md"><intent_id>684886</intent_id><project_id>727902</project_id><text_data>Filed by Aleksey Shutov</text_data><comment_date>2015-03-20T00:00:00</comment_date></row><row _id="row-enzj-zzdk~y5j6" _uuid="00000000-0000-0000-9593-5885DF8D7A21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-enzj-zzdk~y5j6"><intent_id>950284</intent_id><project_id>868453</project_id><text_data>Filed by Bill Martin</text_data><comment_date>2018-12-11T00:00:00</comment_date></row><row _id="row-7sxv~5ug8_8ice" _uuid="00000000-0000-0000-33A8-716E9AFC6034" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7sxv~5ug8_8ice"><intent_id>819471</intent_id><project_id>815039</project_id><text_data>Replace all HVAC filters using hand tools and cargo van for transportation</text_data><comment_date>2017-03-07T00:00:00</comment_date></row><row _id="row-675t-ci4p~i2tb" _uuid="00000000-0000-0000-EBF3-8D2751E0BB21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-675t-ci4p~i2tb"><intent_id>720406</intent_id><project_id>768182</project_id><text_data>Filed by Malcom Jenkins</text_data><comment_date>2015-09-14T00:00:00</comment_date></row><row _id="row-wzmk-jdig~ephd" _uuid="00000000-0000-0000-71D9-D3052D178C45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wzmk-jdig~ephd"><intent_id>905851</intent_id><project_id>849886</project_id><text_data>302760</text_data><comment_date>2018-05-21T00:00:00</comment_date></row><row _id="row-ab3h~vi8n_35ud" _uuid="00000000-0000-0000-C939-1A573324D0C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ab3h~vi8n_35ud"><intent_id>927258</intent_id><project_id>859324</project_id><text_data>Sewer back up in toilets and sinks in the bathrooms/ water was extracted by school employees before we were onsite-  Pull all affected carpet in all the rooms and hallway and pulled base trim, flood cuts, pull insulation   hepa vac  mold remediation  drywall texture paint  once school replaces carpet themselves then we will go back and put in Base  and install cabinets and toe kics and haul contents back to the rooms</text_data><comment_date>2018-08-21T00:00:00</comment_date></row><row _id="row-6xvr.hnds~udik" _uuid="00000000-0000-0000-2A59-29D5F67D6F8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xvr.hnds~udik"><intent_id>546121</intent_id><project_id>700379</project_id><text_data>Corey Whaley 1082 Telegraph RoadBellingham, WA</text_data><comment_date>2012-11-28T00:00:00</comment_date></row><row _id="row-7kct~uk4y.gg4t" _uuid="00000000-0000-0000-B385-6F0E3D6F59D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7kct~uk4y.gg4t"><intent_id>852631</intent_id><project_id>829126</project_id><text_data>STANDARD UNION BENEFIT PACKAGE, GLAZIERS &amp; GLASSWORKERS UNION LOCAL #188JOURNEYMAN GLAZIER:DRUG TESTING/WCISAP $0.06, PENSION $9.70, HEALTH &amp; WELFARE $6.46, APPRENTICESHIP $1.00, LMCI $0.10WAGE INCREASED TO $43.24/HRFRINGE BENEFITS INCREASED TO $17.32/HRJOURNEYMAN LEVEL WAGE: $43.24/HRTOTAL PACKAGE $60.16(EFFECTIVE JULY 1, 2017 THROUGH DECEMBER 31, 2017)</text_data><comment_date>2017-08-04T00:00:00</comment_date></row><row _id="row-cy8h_2vtn~684x" _uuid="00000000-0000-0000-E1CD-75DEF03522C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cy8h_2vtn~684x"><intent_id>599616</intent_id><project_id>722078</project_id><text_data>This project has been approved as a residential project.</text_data><comment_date>2013-10-15T00:00:00</comment_date></row><row _id="row-byh8-5riw~sx8n" _uuid="00000000-0000-0000-C99D-4B2FBD214C72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-byh8-5riw~sx8n"><intent_id>518729</intent_id><project_id>690329</project_id><text_data>Form filed by: Khosrow Kashani</text_data><comment_date>2012-06-25T00:00:00</comment_date></row><row _id="row-gama~r9q9-pv78" _uuid="00000000-0000-0000-0672-CDB3F28075EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gama~r9q9-pv78"><intent_id>1143803</intent_id><project_id>961908</project_id><text_data>1) Contracted to paint the interior of a house that is used as an office.2)It is a single family dwelling that is only used as an office.3) Single story4) a) no b) no c) no it is an office. no one lives there. d)no e) no f) no g) no h) no i) no j)no k)no l) this is a washington state office for the fish and wild life department. it is a house but no one lives there. it was converted to an office. operating hours are 9-5 m-f.5) no6) no 7) yes8 no</text_data><comment_date>2021-05-21T00:00:00</comment_date></row><row _id="row-kt55.iu6i_b2zw" _uuid="00000000-0000-0000-EA99-D1AA222926CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kt55.iu6i_b2zw"><intent_id>845996</intent_id><project_id>815157</project_id><text_data>Filed by T. Galligan</text_data><comment_date>2017-07-07T00:00:00</comment_date></row><row _id="row-nrid-fhfw.htn2" _uuid="00000000-0000-0000-A187-86D454ED0BA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrid-fhfw.htn2"><intent_id>920819</intent_id><project_id>856908</project_id><text_data>Respond to and clean NON-PCB Transformer Oil SpillHaz Waste worker to clear area of all debris using shovels/rakesMotor pat Grader to vacuum area of all contaminated liquids</text_data><comment_date>2018-07-25T00:00:00</comment_date></row><row _id="row-r4mk~wu8x.uqtz" _uuid="00000000-0000-0000-AB02-2B4F60EE2639" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r4mk~wu8x.uqtz"><intent_id>649166</intent_id><project_id>742330</project_id><text_data>Answers above: 1) Intermountain West Insulation was hired to provide weatherization in the form of insulation for these single family homes. 2) Single family homes. 3) single story. 4) a)No B)No C)Yes D-K)No 5)Yes 6)Yes 7)No 8) No</text_data><comment_date>2014-08-20T00:00:00</comment_date></row><row _id="row-cf5u_jizm.zmge" _uuid="00000000-0000-0000-C915-78F038B9D83B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cf5u_jizm.zmge"><intent_id>747261</intent_id><project_id>777389</project_id><text_data>170111-001</text_data><comment_date>2016-02-18T00:00:00</comment_date></row><row _id="row-745e_p6wv-yg9s" _uuid="00000000-0000-0000-84C6-52A805E9CB22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-745e_p6wv-yg9s"><intent_id>1049381</intent_id><project_id>914607</project_id><text_data>9841278</text_data><comment_date>2020-04-03T00:00:00</comment_date></row><row _id="row-k3nj-rnea.aix6" _uuid="00000000-0000-0000-D8CB-54B9808FE43D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3nj-rnea.aix6"><intent_id>575630</intent_id><project_id>712533</project_id><text_data>Equipment &amp; tools:1.	Truck Driver-Driving Truck Mounted Hydro seeder and Skidster2.	Nozzle man-Spraying hydro mulch &amp; Operating Skidster3.	Landscape Laborer: Loading Seed, Fertilizer, Mulch and cleaning.</text_data><comment_date>2013-06-17T00:00:00</comment_date></row><row _id="row-npaa~356a~5wcn" _uuid="00000000-0000-0000-5C1E-4C6D70A08674" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-npaa~356a~5wcn"><intent_id>599966</intent_id><project_id>722220</project_id><text_data>Job # C10303</text_data><comment_date>2013-10-17T00:00:00</comment_date></row><row _id="row-b8fn-abmq~bk7m" _uuid="00000000-0000-0000-D189-B0A2017F4B7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b8fn-abmq~bk7m"><intent_id>1079724</intent_id><project_id>928839</project_id><text_data>SEE PROJECT DESCRIPTION</text_data><comment_date>2020-08-12T00:00:00</comment_date></row><row _id="row-8ats.77ua~u6hp" _uuid="00000000-0000-0000-EDBF-BA9960B41953" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ats.77ua~u6hp"><intent_id>572396</intent_id><project_id>711594</project_id><text_data>NO we will not utilize american recovery and reinvestment act (ARRA) funds.the button will not let me say NO&amp;gt;</text_data><comment_date>2013-05-30T00:00:00</comment_date></row><row _id="row-2r8s.i7xy.8sgi" _uuid="00000000-0000-0000-9325-6FEEA36ED678" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2r8s.i7xy.8sgi"><intent_id>508889</intent_id><project_id>686429</project_id><text_data>Regarding the Wage and Fringe listed above.  This is a Federal contract and does not give a break out of Wage and Fringe.  They only offer a total wage to be paid which includes fringe. The entries I am making represent that we will pay them the full PW wages that are owed, regardless of what amount is wage and what amount is fringe.</text_data><comment_date>2012-04-24T00:00:00</comment_date></row><row _id="row-adnj~2jf3~zdqh" _uuid="00000000-0000-0000-3B31-09D707DFDE8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-adnj~2jf3~zdqh"><intent_id>633930</intent_id><project_id>736617</project_id><text_data>Kaur1 - Mini Split2 - Single family residential3 - one story with basement4 - a-n b-n c-y d-n e-n f-n g-n h-n I-n j-n k-n 5-y6-y7-n8-nPerez1 - Mini Split2 - Single family residential3 - one story with basement4 - a-n b-n c-y d-n e-n f-n g-n h-n I-n j-n k-n 5-y6-y7-n8-nAkers1 - Mini Split2 - Single family residential3 - one story no basement4 - a-n b-n c-y d-n e-n f-n g-n h-n I-n j-n k-n 5-y6-y7-n8-n</text_data><comment_date>2014-06-09T00:00:00</comment_date></row><row _id="row-qc7f.xmnf_u966" _uuid="00000000-0000-0000-1245-76088049CBB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qc7f.xmnf_u966"><intent_id>1234986</intent_id><project_id>960723</project_id><text_data>GU Job #22148Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2022-05-19T00:00:00</comment_date></row><row _id="row-ur4w.fd9h.p8ji" _uuid="00000000-0000-0000-BA62-5DDFEEFD6900" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ur4w.fd9h.p8ji"><intent_id>525764</intent_id><project_id>685455</project_id><text_data>Form filed by: Geoff McNiven</text_data><comment_date>2012-08-01T00:00:00</comment_date></row><row _id="row-gmbp~x3cv-8ygm" _uuid="00000000-0000-0000-12A4-C9330F8B8DDB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gmbp~x3cv-8ygm"><intent_id>794688</intent_id><project_id>804489</project_id><text_data>Demolition of a single family residence. Provide operator/excavator for fire department support to burn two single family residences. Remove foundations of burned residences. An excavator will be used by the operator.</text_data><comment_date>2016-10-10T00:00:00</comment_date></row><row _id="row-kbwk_fc92-kwp8" _uuid="00000000-0000-0000-04A6-EDC6A6A214CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kbwk_fc92-kwp8"><intent_id>1129849</intent_id><project_id>936841</project_id><text_data>SAIF policy #967610</text_data><comment_date>2021-03-18T00:00:00</comment_date></row><row _id="row-mybr.sabp_t564" _uuid="00000000-0000-0000-E5BF-A9DDDFABE47F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mybr.sabp_t564"><intent_id>1233546</intent_id><project_id>1013266</project_id><text_data>353568</text_data><comment_date>2022-05-13T00:00:00</comment_date></row><row _id="row-fr5m_ffkk_9y9y" _uuid="00000000-0000-0000-1496-9FEE277A5289" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fr5m_ffkk_9y9y"><intent_id>1143701</intent_id><project_id>921356</project_id><text_data>PPC #20091</text_data><comment_date>2021-05-11T00:00:00</comment_date></row><row _id="row-nsup.xqxb_cdhg" _uuid="00000000-0000-0000-6D0B-92542EDDE6DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nsup.xqxb_cdhg"><intent_id>1227764</intent_id><project_id>1009772</project_id><text_data>RACK REPAIRS</text_data><comment_date>2022-04-22T00:00:00</comment_date></row><row _id="row-5hkb.cj3d.5mkx" _uuid="00000000-0000-0000-D7EF-69DEC6A7E246" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5hkb.cj3d.5mkx"><intent_id>748905</intent_id><project_id>786123</project_id><text_data>Filed by Eric Connell</text_data><comment_date>2016-02-29T00:00:00</comment_date></row><row _id="row-thuh~5v8e.xzn5" _uuid="00000000-0000-0000-B3BC-3C52FD7894F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thuh~5v8e.xzn5"><intent_id>596532</intent_id><project_id>718680</project_id><text_data>There are 2 parts to this project for our company.  The shop painting portion will be done at our facility in Kent and the field painting portion will be done at the Martin Way Water Plant in Lacey.</text_data><comment_date>2013-09-27T00:00:00</comment_date></row><row _id="row-w5s8_ywyu_b66w" _uuid="00000000-0000-0000-8581-488225D387D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w5s8_ywyu_b66w"><intent_id>556143</intent_id><project_id>704883</project_id><text_data>Prairie Electric, Inc.�s fringe packages only include Health Plan, Vacation Plan, Holiday Plan, Pension Plan, and Apprentice Program.</text_data><comment_date>2013-02-14T00:00:00</comment_date></row><row _id="row-83zh_dr2h~z5nm" _uuid="00000000-0000-0000-8751-C60C94720B0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-83zh_dr2h~z5nm"><intent_id>1278388</intent_id><project_id>1001958</project_id><text_data>1)weatherization of low - income residences, 2). single structure, 3)one level 4. A)no b) no c) yes d)no e) no f) no g) no I) #5 yes #6 yes #7 no #8 no</text_data><comment_date>2022-10-27T00:00:00</comment_date></row><row _id="row-zp3w.5wpq-gsu9" _uuid="00000000-0000-0000-0A8A-1F963FE0CA7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zp3w.5wpq-gsu9"><intent_id>927436</intent_id><project_id>859389</project_id><text_data>01-JO02-JM</text_data><comment_date>2018-08-22T00:00:00</comment_date></row><row _id="row-zfsc_pi2u-4ibb" _uuid="00000000-0000-0000-F292-64DAAF78708F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zfsc_pi2u-4ibb"><intent_id>778860</intent_id><project_id>796217</project_id><text_data>Hood clean</text_data><comment_date>2016-08-01T00:00:00</comment_date></row><row _id="row-3a49~848f-aj7x" _uuid="00000000-0000-0000-2C61-27C8883F2DD0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3a49~848f-aj7x"><intent_id>873558</intent_id><project_id>836932</project_id><text_data>General Laborers:  Workers using manual tools to perform manueal laborOther Trucks:  Water Trucks &amp;lt; 8000 gal for dust control, clean-up</text_data><comment_date>2017-11-07T00:00:00</comment_date></row><row _id="row-jc3t-3avh-54dr" _uuid="00000000-0000-0000-2CBD-37348FE6B086" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jc3t-3avh-54dr"><intent_id>1217998</intent_id><project_id>1003732</project_id><text_data>REFINISHING COUNTERTOPSSINGLE FAMILY DWELLING1A) NO B) NO C)YES D)NO E) NO F)NO G)NO H) NO I)NO J) NO K)NOYESYESNANO</text_data><comment_date>2022-03-15T00:00:00</comment_date></row><row _id="row-hwx4.mwgs_ttur" _uuid="00000000-0000-0000-0DD0-D27A2A60B114" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hwx4.mwgs_ttur"><intent_id>504846</intent_id><project_id>684639</project_id><text_data>Last Name:  CageyFirst Name:  ClintAddress:  3218 Lightning Bird Bellingham, WA 98226PO #:  35-02165</text_data><comment_date>2012-03-22T00:00:00</comment_date></row><row _id="row-raaf~qjnc.wi66" _uuid="00000000-0000-0000-2F92-6277F54D3378" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-raaf~qjnc.wi66"><intent_id>660763</intent_id><project_id>745348</project_id><text_data>BRIAR GROUP INC PROVIDED HYDROSEEDING SERVICES ONLY ON THIS PROJECT.  THE APPLICATION WAS A LAWN PRODUCT.  WE DO NOT HAVE ANY ADDITIONAL INFORMATION ABOUT THIS PROJECT.</text_data><comment_date>2014-10-21T00:00:00</comment_date></row><row _id="row-2r2d.4gmy_ukc3" _uuid="00000000-0000-0000-16BA-4B49DC9C82C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2r2d.4gmy_ukc3"><intent_id>875070</intent_id><project_id>810160</project_id><text_data>Mowing/EDGING/Weeding/Pruning</text_data><comment_date>2017-11-15T00:00:00</comment_date></row><row _id="row-jgqg-gvud_ehy9" _uuid="00000000-0000-0000-5B83-38A6D68967D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgqg-gvud_ehy9"><intent_id>621137</intent_id><project_id>730471</project_id><text_data>1. adding blending ventaltors or fresh air to residential homes. 2. Single family 3. one or two stories.4. Resident. a.no, b.no, c. yes, d. no, e. no, f.no, g. no, h. no, I. no, j.no5. yes6. yes7. no8. no</text_data><comment_date>2014-03-20T00:00:00</comment_date></row><row _id="row-6zd7~98bx-s2mj" _uuid="00000000-0000-0000-DD96-64204C70A685" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6zd7~98bx-s2mj"><intent_id>578469</intent_id><project_id>713517</project_id><text_data>Install Mini Blinds by way of cordless drill and 2' ladder.</text_data><comment_date>2013-06-29T00:00:00</comment_date></row><row _id="row-fetm~phw5_hbfs" _uuid="00000000-0000-0000-5C9E-2BE157662344" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fetm~phw5_hbfs"><intent_id>1008824</intent_id><project_id>892319</project_id><text_data>Other Trucks - Oil Dist and Water Truck</text_data><comment_date>2019-09-20T00:00:00</comment_date></row><row _id="row-kfmg.hvnz-8i5p" _uuid="00000000-0000-0000-F9BC-AD592A0D4501" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kfmg.hvnz-8i5p"><intent_id>1272673</intent_id><project_id>1034296</project_id><text_data>#1 - Install Ductless Heat Pump. #2 - Single Family Home #3 - One level #4 - Private Residence Home #5 - Yes #6 - Yes #7 No #8 - No</text_data><comment_date>2022-10-06T00:00:00</comment_date></row><row _id="row-bs3j.xya7~k4pg" _uuid="00000000-0000-0000-068D-7F40E178DF54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bs3j.xya7~k4pg"><intent_id>1028302</intent_id><project_id>902745</project_id><text_data>The scope of work for maintenance services includes : (This contract is for multiple sites which have different schedules but however the same work is performed, using the same tools.) Turf: Mowing � using regular push mowers Trimming � using a hand held 2 hp weed wacker Edging � using a hand held 2 hp edger Fertilizing � using a walk behind fertilizer spreader Herbicide application � using back pack sprayer 4 gallon TREES, SHRUBS AND GROUND COVER BEDS Weeding � using hula hoes, a rake to pile up and hand stuffed into a garbage bag. Trimming Ground Cover � trimming/pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage can. Pruning Shrubs - trimming / pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage can Pre-emergent Herbicide � hand held spreader HARD SURFACES  Sweeping � using back pack air blowers  Weeds � using back pack sprayer 4 gallon OTHER Leaf Removal � Raked into piles and placed into 30 gallon garbage cans. Litter � Picked up by hand and placed into garbage bags. ANNUAL FLOWER BEDS Change Annual Color � remove existing annual color with shovels, replace with new annual color and cover new material using shovel and rake bed using hand held rakes. Fertilizer � applied using a hand held spreader Groom Annuals � no tools, hand grooming Weeding - no tools, hand weeding Herbicide � applied using back pack sprayers IRRIGATION System Start-up � small shovel to remove dirt from system. Operate System � no tools Winterize System � air compressor is used to blow system. All work is hauled off site with a F-350 Ford Truck.</text_data><comment_date>2019-12-20T00:00:00</comment_date></row><row _id="row-kux9_56cy.nfi4" _uuid="00000000-0000-0000-205F-3DAD85DE73FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kux9_56cy.nfi4"><intent_id>522026</intent_id><project_id>691501</project_id><text_data>Form Filed by: Jon Lamore - petu235</text_data><comment_date>2012-07-12T00:00:00</comment_date></row><row _id="row-2uth-ievg-4zyz" _uuid="00000000-0000-0000-EF1F-DD2C9588A0BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2uth-ievg-4zyz"><intent_id>1317140</intent_id><project_id>1061840</project_id><text_data>90.57 was the hourly rate on this project for our worker Perrie.</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-c4fm-cz5c-assg" _uuid="00000000-0000-0000-F472-580B7E8AFE28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c4fm-cz5c-assg"><intent_id>608856</intent_id><project_id>706281</project_id><text_data>#1 - Interior repaint &amp; exterior repaint of apartments.  #2 - Apartment.  #3 - 3 stories #4 a - No, b - No, c - No, d - No, e - No, f - No, g - No, h - No, I - No, J - no, K No.  #5 - Yes. #6 - Yes.  #7 - Yes.  #8 - No.</text_data><comment_date>2013-12-17T00:00:00</comment_date></row><row _id="row-6khb.mwiv~8h4y" _uuid="00000000-0000-0000-6F90-7895405DCDFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6khb.mwiv~8h4y"><intent_id>495854</intent_id><project_id>663397</project_id><text_data>Job #T10319 Related to Job #C10205</text_data><comment_date>2012-01-06T00:00:00</comment_date></row><row _id="row-iajd_2hu7_72rg" _uuid="00000000-0000-0000-24E2-D341AD5D1598" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iajd_2hu7_72rg"><intent_id>542467</intent_id><project_id>676581</project_id><text_data>This project is exempt from state prevailing wage requirements per the Housing Act of 1937 and 24CFR 965.101. Workers will be paid in accordance with Davis Baconn Wage Requirements for the following crafts/trades. occupations.</text_data><comment_date>2012-12-13T00:00:00</comment_date></row><row _id="row-hze2-fcwp-npim" _uuid="00000000-0000-0000-2BC3-543877F3E69A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hze2-fcwp-npim"><intent_id>1093823</intent_id><project_id>927142</project_id><text_data>No contractor's License required. Per hour trucking</text_data><comment_date>2020-10-06T00:00:00</comment_date></row><row _id="row-c5mb~p5wj-q8di" _uuid="00000000-0000-0000-94A3-000485D490E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c5mb~p5wj-q8di"><intent_id>691565</intent_id><project_id>761009</project_id><text_data>Tami Mitchell is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height. The home is not open to the public and does not have a business. The electricians will be installing bathroom and kitchen fan and installing a ductless heat pump. This job meets the residential job requirements.</text_data><comment_date>2015-04-29T00:00:00</comment_date></row><row _id="row-nt2k~3tdn.zmcw" _uuid="00000000-0000-0000-EF79-E9679B76DF76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nt2k~3tdn.zmcw"><intent_id>1171614</intent_id><project_id>976260</project_id><text_data>1.Conduct site work and preparation for ISA Certified Assessment and Report for a row of 32 trees. Visually observe, measure &amp; evaluate 32 trees by determining the health and vigor of the trees and any hazard they may present. This is done on the ground with a tape measure, binoculars, camera and a clinometer to determine the height and width of the trees. The information is gathered and put into a report. Note:  This work is done by a certified arborist and tree risk assessor, he is consulting on the trees in question.  This may develop into other work based on the report by our tree service workers.2.The bid date and award date are correct.3.Because he is consulting on the project his hourly wage is $75.  Some arborists charge up to $250 an hour, this is a fair wage as this is what we pay him for his expertise.  There is not a good job category for this job.  Under our L&amp;I classifications he fell under Timber Cruiser per Dale McMaster.</text_data><comment_date>2021-09-04T00:00:00</comment_date></row><row _id="row-gejk-dade~bjks" _uuid="00000000-0000-0000-9DC7-F238D4952009" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gejk-dade~bjks"><intent_id>1184111</intent_id><project_id>982831</project_id><text_data>Project# 03399, Hobert, David, 2509 W Francis Ave, Spokane, WA 99205</text_data><comment_date>2021-10-13T00:00:00</comment_date></row><row _id="row-4hbk-rz3s~p7br" _uuid="00000000-0000-0000-C304-A2F8E05D5B14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4hbk-rz3s~p7br"><intent_id>1078659</intent_id><project_id>925726</project_id><text_data>Crew of two employees will be using a 2019 Ram ProMaster high roof van, model 3500, 8,000 GVW to haul material and equipment to job site and debris back to warehouse.</text_data><comment_date>2020-08-07T00:00:00</comment_date></row><row _id="row-ryqa_sivb~v3fd" _uuid="00000000-0000-0000-8205-2E1B8CA6F346" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ryqa_sivb~v3fd"><intent_id>1316603</intent_id><project_id>1061511</project_id><text_data>IFS WO# 146314, COB Tam O'Shanter clean up per Andy Heider, Landscape clean up including raking and blowing leaves out of beds and off of turf. Work completed by hand with hand tools other than blower.</text_data><comment_date>2023-04-04T00:00:00</comment_date></row><row _id="row-z7c6-75r9_9xdw" _uuid="00000000-0000-0000-F0F2-0A9D2C2D7A7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7c6-75r9_9xdw"><intent_id>629908</intent_id><project_id>735085</project_id><text_data>Our job for this contract requires one licensed technician to drive a pick up truck with a spray tank and boom apparatus attached to apply a herbicide application to the road side curbs, gutters and gravel shoulders for 9 different roads as designated by the City of West Richland.  The technician may also need to get out of the truck at larger locations to apply the herbicide with a hand held spray gun attached to the spray tank mentioned above.</text_data><comment_date>2014-05-15T00:00:00</comment_date></row><row _id="row-7tpn_btde-egwt" _uuid="00000000-0000-0000-E3B9-517DC3E8FF31" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7tpn_btde-egwt"><intent_id>644615</intent_id><project_id>740616</project_id><text_data>Prime Job# 5143189; provided and installed 24 new category 6A cables from the existing 1st floor IDF room to the existing basement of IDF room at the central library.</text_data><comment_date>2014-07-30T00:00:00</comment_date></row><row _id="row-y4hx.8bmk_4n5z" _uuid="00000000-0000-0000-6312-E4D642362E0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y4hx.8bmk_4n5z"><intent_id>999999</intent_id><project_id>877316</project_id><text_data>FILED BY TONY GRONLUND</text_data><comment_date>2019-08-15T00:00:00</comment_date></row><row _id="row-ffgv_pett_kht2" _uuid="00000000-0000-0000-01E2-15D0E37047A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ffgv_pett_kht2"><intent_id>1027764</intent_id><project_id>902474</project_id><text_data>Provide service for voice and data. All work will be performed inside.</text_data><comment_date>2019-12-18T00:00:00</comment_date></row><row _id="row-m8tu-7ekg_xe2y" _uuid="00000000-0000-0000-B86E-2D6F058605C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8tu-7ekg_xe2y"><intent_id>691684</intent_id><project_id>761065</project_id><text_data>Filed by Philip Marsh</text_data><comment_date>2015-04-29T00:00:00</comment_date></row><row _id="row-4i9i_grvy.25xb" _uuid="00000000-0000-0000-9679-48644BEAA7A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4i9i_grvy.25xb"><intent_id>1220742</intent_id><project_id>915048</project_id><text_data>Project Scope: Building a new academic building on UW Bothell�s campus to be shared with Cascadia College. Construction will include structural building as well as bringing electrical, plumbing, and HVAC systems to the newly constructed building. Additional construction activities include: concrete placement, rock walls, construction of sidewalks, stairs and pathways, and landscape restoration and beautification. Terra Dynamics scope:-The installation of a new automatic irrigation system. Trenching will be performed by a mini-excavator. Mainline will be buried at a minimum depth of 18� and laterals at a minimum 12� depth.-Furnish and install topsoil at depths of 18� and 6�. Skid steers and power buggies will be utilized for installation. -Wood chips and mulches will be installed at depths of 6� and 3� respectively. Skid steers and power buggies will be utilized for installation. -8� x 8� timber steps will be installed over compacted aggregate base course using #4 rebar to secure the timber. Skid steer and plate compactor will be utilized for installation. -Install gravel path with steel edging (6� base course, 4� aggregate surface).-Install maintenance strip (6� maintenance ballast) with aluminum edging along building. -Perform planting for trees, shrubs, and groundcover.-Install all bioretention pond areas including soil, bark and planting.-Restoration of food forest grass area with 4� topsoil and hydroseeding.-Place 27 logs that have been salvaged on site.There is no drainage being performed by TDI.</text_data><comment_date>2022-03-31T00:00:00</comment_date></row><row _id="row-su9c-w5de_8ztp" _uuid="00000000-0000-0000-9390-76E8B8DB2100" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-su9c-w5de_8ztp"><intent_id>578889</intent_id><project_id>712683</project_id><text_data>WORKERS COMP CARRIER - SAIF CORP, POLICY #947202WE DO NOT HAVE ANY EMPLOYEES THAT ARE RESIDENTS OF WASHINGTON</text_data><comment_date>2013-07-02T00:00:00</comment_date></row><row _id="row-n5kc-pnas.gpmr" _uuid="00000000-0000-0000-5036-145578C40D44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n5kc-pnas.gpmr"><intent_id>1112389</intent_id><project_id>859219</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2020-12-30T00:00:00</comment_date></row><row _id="row-ckka.j7nr_ei5g" _uuid="00000000-0000-0000-8D5E-5049D11D6249" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ckka.j7nr_ei5g"><intent_id>798605</intent_id><project_id>805997</project_id><text_data>Terminate fiber cable that runs between site 32 and maintenance building(outdoors) Terminate fiber between pump house 3 and east gate. Labeled and tested all cables</text_data><comment_date>2016-10-31T00:00:00</comment_date></row><row _id="row-228j_9xcj_b45e" _uuid="00000000-0000-0000-C089-D396EA0AA6D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-228j_9xcj_b45e"><intent_id>715850</intent_id><project_id>768804</project_id><text_data>Our scope of work includes mobilization, topsoil installation 2&amp;quot; thick, sod installation and the remove and replace automatic sprinklers.  Tools include sod cutter, various hand tools and equipment &amp;lt; 90 hp</text_data><comment_date>2015-08-20T00:00:00</comment_date></row><row _id="row-3e65.2q7s-eup5" _uuid="00000000-0000-0000-AA80-3E3CED8AAD20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3e65.2q7s-eup5"><intent_id>668115</intent_id><project_id>741683</project_id><text_data>4901 hillcrest dr Yakima,wa 98901 1. install bath fan 2. single family house 3. 1 level 4a. no b. no c. yes d. no e. no f. no g. no h. no I. no j. no k. no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2014-12-02T00:00:00</comment_date></row><row _id="row-t928-8afu~i8v2" _uuid="00000000-0000-0000-C209-46513A951C19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t928-8afu~i8v2"><intent_id>1231422</intent_id><project_id>1011903</project_id><text_data>WRI JOB# 22.850/48083</text_data><comment_date>2022-05-05T00:00:00</comment_date></row><row _id="row-zdgv_muy8_7q46" _uuid="00000000-0000-0000-0B0A-4642054E49DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdgv_muy8_7q46"><intent_id>663461</intent_id><project_id>747912</project_id><text_data>$0 initial cost to the state. State responsible for cost to remove all hazardous materials at time and disposal costs</text_data><comment_date>2014-12-09T00:00:00</comment_date></row><row _id="row-7q9x-n4sa_8m3u" _uuid="00000000-0000-0000-878F-AD31223B996E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7q9x-n4sa_8m3u"><intent_id>939494</intent_id><project_id>863924</project_id><text_data>Install new cabling that can can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2018-10-12T00:00:00</comment_date></row><row _id="row-ezqq-xvmr~wpw8" _uuid="00000000-0000-0000-5D7C-1E96848368FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezqq-xvmr~wpw8"><intent_id>651920</intent_id><project_id>743368</project_id><text_data>Job # T10394</text_data><comment_date>2014-09-02T00:00:00</comment_date></row><row _id="row-bcgm~qeas-w32x" _uuid="00000000-0000-0000-A48E-B3C9CF264A38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bcgm~qeas-w32x"><intent_id>809585</intent_id><project_id>740822</project_id><text_data>WE DON&amp;#39;T HAVE ANY EMPLOYEES THAT ARE RESIDENTS OF WA STATE.  WORKERS COMP CARRIER- SAIF CORP# 947202</text_data><comment_date>2017-01-04T00:00:00</comment_date></row><row _id="row-3ye7~a88q.vnjw" _uuid="00000000-0000-0000-B653-94E7A6EA5CB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ye7~a88q.vnjw"><intent_id>1251679</intent_id><project_id>1023226</project_id><text_data>We have an Idaho worker's comp policy that covers our employees in Washington and Idaho. Policy# KWC1247355</text_data><comment_date>2022-07-25T00:00:00</comment_date></row><row _id="row-qjyc-b83u.x3en" _uuid="00000000-0000-0000-CB28-BB825A28EE04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qjyc-b83u.x3en"><intent_id>1035835</intent_id><project_id>901773</project_id><comment_date>2020-02-04T00:00:00</comment_date></row><row _id="row-g53r.a8ap_wri5" _uuid="00000000-0000-0000-5D64-E1E8D54D89FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g53r.a8ap_wri5"><intent_id>760395</intent_id><project_id>791245</project_id><text_data>Filed by Karol BakamusProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirementsProject Site Addresses:EB Wilson Building � 1202 South M Street, Tacoma, WA 98405 Davis-Bacon Building (Commercial Rates Apply WA150038 3/27/15Fawcett Apartments � 3201 Fawcett Ave, Tacoma, WA 98418- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15Wright Street Apartments � 602 South Wright Street, Tacoma, 98418- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15K Street Apartments � 911 North K Street, Tacoma, WA 98403- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15Ludwig Apartments � 5425 South Lawrence Street, Tacoma, WA 98409- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15G Street Apartments � 401 North G Street, Tacoma, WA 98403- Davis-Bacon Building Residential Rates Apply WA150118 3/27/156th Avenue Apartments � 2302 6th Avenue, Tacoma, WA 98225- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15Bergerson Terrace Apartments � 5301 South Orchard, Tacoma, WA 98229- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15Dixon Village � 5401 South Stevens, Tacoma, WA 98409- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15</text_data><comment_date>2016-05-05T00:00:00</comment_date></row><row _id="row-d7rg.mwyd.m4vu" _uuid="00000000-0000-0000-0770-454C17F277F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7rg.mwyd.m4vu"><intent_id>611043</intent_id><project_id>726898</project_id><text_data>Bremen will be planting 43 street trees. Contract includes clearing and grubbing 2x2' holes, removing soil, planting, staking, guying and installing biobarrier for trees. There is also some erosion control in the form of catch basin inserts installed along the street. Contract includes ESC lead and a SWPP plan, erosion and water pollution control, as well as a SPCC plan. It also includes watering trees, fertilizing, mulching, street cleaning (subcontractor) and flagging.  Contract also includes unanticipated site work and landscape restoration, which can entail seeding.</text_data><comment_date>2014-01-07T00:00:00</comment_date></row><row _id="row-e8uv-htpe-bk9j" _uuid="00000000-0000-0000-47FA-D91C1CB1BAD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e8uv-htpe-bk9j"><intent_id>1018538</intent_id><project_id>898147</project_id><text_data>#1-REPLACE GAS FURNACE AND WATER HEATER #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2019-10-29T00:00:00</comment_date></row><row _id="row-99rh~yyzv~7yfh" _uuid="00000000-0000-0000-EFE4-1C75C9865CD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-99rh~yyzv~7yfh"><intent_id>1242435</intent_id><project_id>1018308</project_id><text_data>Fringes: Pension $15.03, Insurance $13.46, Training $1.27, Industry Fund $.65, Organizational Trust Fund $1.00, Clean Card $.07</text_data><comment_date>2022-06-18T00:00:00</comment_date></row><row _id="row-ek43-whjz~6wpp" _uuid="00000000-0000-0000-7C48-D99361D2D30F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ek43-whjz~6wpp"><intent_id>1209367</intent_id><project_id>998244</project_id><text_data>Fringe- Insurance $2.87, Holiday $0.65, Pension $1.12, Paid Time Off $1.09</text_data><comment_date>2022-02-04T00:00:00</comment_date></row><row _id="row-wyu8-6xqa_7yx5" _uuid="00000000-0000-0000-0122-27D38BFDD83B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wyu8-6xqa_7yx5"><intent_id>550655</intent_id><project_id>702479</project_id><text_data>Remove ivy from existing planting bed. Install 4&amp;quot; depth of mulch. Work performed using hand tools and 45hp walk behind dingo loader.</text_data><comment_date>2013-01-04T00:00:00</comment_date></row><row _id="row-ej63.xxzh_j9ey" _uuid="00000000-0000-0000-43E1-EC9E52FDE9EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ej63.xxzh_j9ey"><intent_id>1289025</intent_id><project_id>1044234</project_id><text_data>Truck driver - Ram 1500 Pick up</text_data><comment_date>2022-12-09T00:00:00</comment_date></row><row _id="row-6eur-dduk_q24c" _uuid="00000000-0000-0000-D130-3C400E03902C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6eur-dduk_q24c"><intent_id>616273</intent_id><project_id>729132</project_id><text_data>Filed By: James M. Maher</text_data><comment_date>2014-02-13T00:00:00</comment_date></row><row _id="row-fm7x_zmd8.d8tb" _uuid="00000000-0000-0000-374F-1904C2EA10AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fm7x_zmd8.d8tb"><intent_id>1270787</intent_id><project_id>1033281</project_id><text_data>Pruning shrubs in landscape beds with hedge shears.</text_data><comment_date>2022-10-24T00:00:00</comment_date></row><row _id="row-zj4b~paqi-d9dv" _uuid="00000000-0000-0000-FE83-E0EEB48A04DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zj4b~paqi-d9dv"><intent_id>534525</intent_id><project_id>694218</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-09-19T00:00:00</comment_date></row><row _id="row-mu2m.vwav.7gsd" _uuid="00000000-0000-0000-FBE7-3A466F11B9A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mu2m.vwav.7gsd"><intent_id>1218515</intent_id><project_id>999997</project_id><text_data>Our firm will be providing Landscape services on this project.</text_data><comment_date>2022-03-17T00:00:00</comment_date></row><row _id="row-pabb.vbpz.qegw" _uuid="00000000-0000-0000-679C-35DC47E378E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pabb.vbpz.qegw"><intent_id>808842</intent_id><project_id>786653</project_id><text_data>PTI SO 115834</text_data><comment_date>2016-12-28T00:00:00</comment_date></row><row _id="row-a5fn_vhhu_3c4b" _uuid="00000000-0000-0000-DEC3-BFA5B3C91D2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5fn_vhhu_3c4b"><intent_id>608477</intent_id><project_id>725607</project_id><text_data>Filed by Michael Hummel1.) What was is the purpose of this project?Update the security alarm system and access controls for all Kent School District schools and administrative buildings.2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.) Does the project entail the remodeling or new construction of a facility? No.4.) If your firm is working upon a type of building system, what type of system is involved?Burglar alarm system.5.) What specific tasks did your employees perform?Siemen�s SES Technicians, perform their work strictly on laptop computers, both remotely and on-site during the commissioning process. While off-site, the SES Technicians updaye program configurations and point inputs. The SES Technician typically sits in at control panel and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the SES Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, SES Technicians do not use trade tools, such as drills or wrenches.6.) What, in any, tools did your employees use in the performance of those tasks?Laptop computer7.) If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No � none.8.) Are you going to be hiring any subcontractors for this project? Yes.</text_data><comment_date>2013-12-13T00:00:00</comment_date></row><row _id="row-gy34~6nqn~utan" _uuid="00000000-0000-0000-E14F-82F26148137F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gy34~6nqn~utan"><intent_id>994661</intent_id><project_id>888305</project_id><text_data>Olympic View Elementary</text_data><comment_date>2019-07-25T00:00:00</comment_date></row><row _id="row-z388-h75y-a7vy" _uuid="00000000-0000-0000-7C84-1E6F5920936C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z388-h75y-a7vy"><intent_id>604553</intent_id><project_id>713422</project_id><text_data>PEO DRIVES AND OPERATES VACUUM TRUCKLABORER HANDLES HOSES2.01 PER HR MEDICAL DENTAL HEALTH AND LIFE INSUR.74 PER HR HOLIDAY AND VACATION</text_data><comment_date>2013-11-14T00:00:00</comment_date></row><row _id="row-dxwh.xg7c-yywg" _uuid="00000000-0000-0000-E2CD-184FD3DDBF3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dxwh.xg7c-yywg"><intent_id>680338</intent_id><project_id>736877</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2015-03-04T00:00:00</comment_date></row><row _id="row-5nuu_p55u.2fzb" _uuid="00000000-0000-0000-A220-AEA433AA8E42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5nuu_p55u.2fzb"><intent_id>882388</intent_id><project_id>838321</project_id><text_data>**Benefits do not apply to 1st/2nd period Apprentices.**Annuity  $6.55**Pension  $9.95Health  $7.52IMPACT  $  .25Apprenticeship  $  .69Industry  $  .02</text_data><comment_date>2018-01-08T00:00:00</comment_date></row><row _id="row-yhg9_3a9n_peuc" _uuid="00000000-0000-0000-4F5A-0880F5471EC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yhg9_3a9n_peuc"><intent_id>825050</intent_id><project_id>816833</project_id><text_data>103-17-1120</text_data><comment_date>2017-04-06T00:00:00</comment_date></row><row _id="row-eu8x.5png.geui" _uuid="00000000-0000-0000-F189-0B1E9A70B5E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eu8x.5png.geui"><intent_id>1114545</intent_id><project_id>945004</project_id><comment_date>2021-01-12T00:00:00</comment_date></row><row _id="row-rdbk~gwps~u2gj" _uuid="00000000-0000-0000-3FBA-7F9626D28BAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rdbk~gwps~u2gj"><intent_id>825620</intent_id><project_id>817231</project_id><text_data>4/14/17:  Entered our company L&amp;I account ID</text_data><comment_date>2017-04-14T00:00:00</comment_date></row><row _id="row-qcki-dgt4-viij" _uuid="00000000-0000-0000-09D6-670143FBCA24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qcki-dgt4-viij"><intent_id>804331</intent_id><project_id>808089</project_id><text_data>1) Repair leak under tub drain. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f) No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) Yes - manager office. 8) No.</text_data><comment_date>2016-11-28T00:00:00</comment_date></row><row _id="row-xs7a_uukj-7534" _uuid="00000000-0000-0000-5A90-0BD618DA5A3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xs7a_uukj-7534"><intent_id>940933</intent_id><project_id>852781</project_id><text_data>Truck is a 3000 gal truck mounted hydroseeder</text_data><comment_date>2018-10-19T00:00:00</comment_date></row><row _id="row-mrnc.tmqi~kkny" _uuid="00000000-0000-0000-98DC-7C69F7DFB3CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrnc.tmqi~kkny"><intent_id>637064</intent_id><project_id>737831</project_id><text_data>Rip out old grass, sprinkler work, plant plants, re-sod, put bark. Remove old concrete and install new concrete.</text_data><comment_date>2014-06-25T00:00:00</comment_date></row><row _id="row-gsva-cs3s~6af5" _uuid="00000000-0000-0000-6035-5898CA1765FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gsva-cs3s~6af5"><intent_id>763137</intent_id><project_id>791245</project_id><text_data>Filed by Karol BakamusProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirementsProject Site Addresses:EB Wilson Building � 1202 South M Street, Tacoma, WA 98405 Davis-Bacon Building (Commercial) Rates Apply WA150038 3/27/15Fawcett Apartments � 3201 Fawcett Ave, Tacoma, WA 98418- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15Wright Street Apartments � 602 South Wright Street, Tacoma, 98418- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15K Street Apartments � 911 North K Street, Tacoma, WA 98403- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15Ludwig Apartments � 5425 South Lawrence Street, Tacoma, WA 98409- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15G Street Apartments � 401 North G Street, Tacoma, WA 98403- Davis-Bacon Building Residential Rates Apply WA150118 3/27/156th Avenue Apartments � 2302 6th Avenue, Tacoma, WA 98225- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15Bergerson Terrace Apartments � 5301 South Orchard, Tacoma, WA 98229- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15Dixon Village � 5401 South Stevens, Tacoma, WA 98409- Davis-Bacon Building Residential Rates Apply WA150118 3/27/15</text_data><comment_date>2016-05-19T00:00:00</comment_date></row><row _id="row-di54-jrd9_zdj2" _uuid="00000000-0000-0000-08B2-719FA8B7734F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-di54-jrd9_zdj2"><intent_id>1317364</intent_id><project_id>1061047</project_id><text_data>23-80-118The other truck will be a lowboy tractor and trailer used to haul heavy equipment to and from the project location.</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-2t99-2ckx~yh39" _uuid="00000000-0000-0000-435F-92B8FA831A57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2t99-2ckx~yh39"><intent_id>1040794</intent_id><project_id>909756</project_id><text_data>1# Clear clogged toilet  - # 2 Apartment -# 3 - two - # 4 Housing  - # 6 yes - # 7 - Yes # 8 yes - # yesa- b- noc - yesd-noe-nof -nog-noh-noi- noj - nok -no</text_data><comment_date>2020-02-25T00:00:00</comment_date></row><row _id="row-uuwu.9ksn~y8qb" _uuid="00000000-0000-0000-2D86-7F3A345E0EA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uuwu.9ksn~y8qb"><intent_id>1257407</intent_id><project_id>1026193</project_id><text_data>Landscape Operator will be scraping top 6 inches of grass and dirt to spread gravel.  Landscape labor will spread topsoil.</text_data><comment_date>2022-08-11T00:00:00</comment_date></row><row _id="row-bngd-5iv4.83bn" _uuid="00000000-0000-0000-BFD7-5A5E906B40C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bngd-5iv4.83bn"><intent_id>1038491</intent_id><project_id>908473</project_id><text_data>118855-001</text_data><comment_date>2020-02-14T00:00:00</comment_date></row><row _id="row-dvsa~sn6k-88yy" _uuid="00000000-0000-0000-1FFA-A2A64D330B5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dvsa~sn6k-88yy"><intent_id>672081</intent_id><project_id>751840</project_id><text_data>An &amp;#39;operable wall&amp;#39; is a movable partition, made up of individual panels, that is used to create two rooms out of one.Maintenance to these walls includes adjusting trolleys to plumb panels, checking/adjusting hinges, checking/adjusting seals and cleaning/lubricating track to facilitate seamless operation.</text_data><comment_date>2015-02-02T00:00:00</comment_date></row><row _id="row-yqwt_tzap-brpu" _uuid="00000000-0000-0000-C1F4-F1DC3AB423F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yqwt_tzap-brpu"><intent_id>864874</intent_id><project_id>833400</project_id><text_data>owner operator only.</text_data><comment_date>2017-09-25T00:00:00</comment_date></row><row _id="row-r8k2~p8k3.6skv" _uuid="00000000-0000-0000-9CEF-6722E7BFD40A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r8k2~p8k3.6skv"><intent_id>1161564</intent_id><project_id>889304</project_id><text_data>Hired Speer Taps as a Sub Tier Contractor UBI# 600491975</text_data><comment_date>2021-07-20T00:00:00</comment_date></row><row _id="row-dgpu-dp6f_7zht" _uuid="00000000-0000-0000-960F-8E306D6C8E3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgpu-dp6f_7zht"><intent_id>1279138</intent_id><project_id>1037813</project_id><text_data>work for paul anderson @ lake hills p-patch pruning firs</text_data><comment_date>2022-11-01T00:00:00</comment_date></row><row _id="row-bfci_nk42-s4xp" _uuid="00000000-0000-0000-3E0A-6ABD3AD31802" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bfci_nk42-s4xp"><intent_id>898971</intent_id><project_id>848489</project_id><text_data>Blairco Job Number 18-7706</text_data><comment_date>2018-04-17T00:00:00</comment_date></row><row _id="row-y86g-kasc.jfta" _uuid="00000000-0000-0000-5683-D03655B979C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y86g-kasc.jfta"><intent_id>475442</intent_id><project_id>666141</project_id><text_data>All work performed in shop at 1515 75th St SW, Ste 600, Everett, WA 98203</text_data><comment_date>2011-08-30T00:00:00</comment_date></row><row _id="row-js5r~wytq.48hd" _uuid="00000000-0000-0000-9C61-C6C5B871E611" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-js5r~wytq.48hd"><intent_id>557232</intent_id><project_id>705408</project_id><text_data>We installed four wireless access point data cables to a wi-fi location. The work was done indoors.</text_data><comment_date>2013-02-27T00:00:00</comment_date></row><row _id="row-t7nw.r3yy-6zjg" _uuid="00000000-0000-0000-1FED-22DF8DB57762" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t7nw.r3yy-6zjg"><intent_id>511145</intent_id><project_id>687355</project_id><text_data>HIF# 12467709</text_data><comment_date>2012-05-09T00:00:00</comment_date></row><row _id="row-iwt4~jwtv-xqmt" _uuid="00000000-0000-0000-6BED-DFBCED055A67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iwt4~jwtv-xqmt"><intent_id>821119</intent_id><project_id>815777</project_id><text_data>NORDIC JOB 17940</text_data><comment_date>2017-03-16T00:00:00</comment_date></row><row _id="row-qs7w~ynv3-7bkf" _uuid="00000000-0000-0000-07BE-EFCEB1E20062" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qs7w~ynv3-7bkf"><intent_id>1465864</intent_id><project_id>1104502</project_id><text_data>Workers comp account, Idaho State Insurance Fund, Policy #654594</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-hwm3-hwyi.3bg9" _uuid="00000000-0000-0000-48D8-1D09D5C0918C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hwm3-hwyi.3bg9"><intent_id>497644</intent_id><project_id>681671</project_id><text_data>Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor).  To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures.  Please note that an on-call/blanket/annual contract may not be utilized for construction projects or for warranty work as these require their own set of Intent and forms with the appropriate bid and award dates associated with those specific contracts.  The use of on-call/blanket/annual contracts is limited to maintenance and repair work.  If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work.On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out.  (RCW 39.12.040)We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.  A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp(chrr235)</text_data><comment_date>2012-02-24T00:00:00</comment_date></row><row _id="row-tumk~ib5f_n3sf" _uuid="00000000-0000-0000-A355-919D224E531F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tumk~ib5f_n3sf"><intent_id>566905</intent_id><project_id>706688</project_id><text_data>FRINGE RATE:PENSION:        9.20H &amp; W:          6.77APPR:            .63ANNUITY:        4.00IMPACT:          .28INDUSTRY:        .01TOTAL FRINGE:  20.89</text_data><comment_date>2013-04-29T00:00:00</comment_date></row><row _id="row-87uu~8wri_qkgp" _uuid="00000000-0000-0000-56BC-AD513FA3400A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87uu~8wri_qkgp"><intent_id>1267966</intent_id><project_id>1031763</project_id><text_data>Job# 33217</text_data><comment_date>2022-09-20T00:00:00</comment_date></row><row _id="row-hpax~dwku-tnj6" _uuid="00000000-0000-0000-7A08-F0F07FC9E644" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hpax~dwku-tnj6"><intent_id>749895</intent_id><project_id>759774</project_id><text_data>152109 Provide and install pathway, and new cat6 cabling for wireless access points (wireless data for computers). Install customer provided wireless access points. Cabling will be installed indoors and run to the nearest MDF or IDF for termination</text_data><comment_date>2016-03-04T00:00:00</comment_date></row><row _id="row-grke-icdn~xnwu" _uuid="00000000-0000-0000-E37F-CDF21809B54E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-grke-icdn~xnwu"><intent_id>628541</intent_id><project_id>734535</project_id><text_data>SERVICE TECHNICIAN REPAIRED HEATING BOILER. REPLACED DEFECTIVE PARTS INCLUDING GAS VALVE AND IGNITION MODULE USING STANDARD HAND TOOLS. NO SPECIAL EQUIPMENT WAS NECESSARY. SERVICE TECHNICIAN USED COMPANY SERVICE VEHICLE TO GET TO AND FROM JOB SITE.</text_data><comment_date>2014-05-09T00:00:00</comment_date></row><row _id="row-w67n.252x-6ibv" _uuid="00000000-0000-0000-B028-C3575F9F18F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w67n.252x-6ibv"><intent_id>865669</intent_id><project_id>833728</project_id><text_data>Haz Waste workers to clean ducting using rags, spongesSheet Metal Workers to cut and remove some ducting using hand clippers</text_data><comment_date>2017-09-28T00:00:00</comment_date></row><row _id="row-abbu_gv2x_f5wj" _uuid="00000000-0000-0000-E1D2-DEAB6CB325C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-abbu_gv2x_f5wj"><intent_id>764507</intent_id><project_id>792971</project_id><text_data>1) We will provide weatherization services to low income clients in private homes.  2)The home may be single or multifamily dwellings but for the most part single family dwellings.  3)No structures will have more than three levels including basement (two story structures). 4a no, 4b no 4c yes, 4d no 4e. no f. no g. no h. no I no j yes k no.  5 yes 6 yes, 7 for multifamily dwellings yes in some cases.  8 no</text_data><comment_date>2016-05-25T00:00:00</comment_date></row><row _id="row-2mqa.g2e8-ka9i" _uuid="00000000-0000-0000-EC77-2A6D9F68AEB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2mqa.g2e8-ka9i"><intent_id>1318730</intent_id><project_id>1062787</project_id><text_data>PO 2023001697  FS-2302-004128</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-2w8f~kxcn-hm2i" _uuid="00000000-0000-0000-99B0-D0CD5235838B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2w8f~kxcn-hm2i"><intent_id>1317522</intent_id><project_id>1058941</project_id><text_data>water truck for dust control and semi-lowboy for equipment mobilization</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-byeg-r384.zmkn" _uuid="00000000-0000-0000-790D-EA97D46F4613" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-byeg-r384.zmkn"><intent_id>1317350</intent_id><project_id>1046967</project_id><text_data>Truck Driver - Semi (tractors) with 53' flatbed trailers to haul temporary concrete barrier.</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-28kv.22yp-evqg" _uuid="00000000-0000-0000-E423-062AAFE01626" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-28kv.22yp-evqg"><intent_id>642861</intent_id><project_id>739954</project_id><text_data>#1 - Remove and replace apartment home windows.#2 - Yes#3 - 3#4a - No#4b - No#4c - Yes (apartments)#4d - No#4e - No#4f - No#4g - No#4h - No#4i - No#4j - No#4k - No#5 - Yes#6 - Yes#7 - Not known#8 - No</text_data><comment_date>2014-07-23T00:00:00</comment_date></row><row _id="row-vbch~twkj~a6cg" _uuid="00000000-0000-0000-D378-924FA415488A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vbch~twkj~a6cg"><intent_id>668973</intent_id><project_id>750336</project_id><text_data>1514288</text_data><comment_date>2014-12-09T00:00:00</comment_date></row><row _id="row-x4g2~rbu7~pqt6" _uuid="00000000-0000-0000-30CE-F69303D4FE0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x4g2~rbu7~pqt6"><intent_id>666961</intent_id><project_id>725937</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2014-11-21T00:00:00</comment_date></row><row _id="row-6axm_tfeb.z2bk" _uuid="00000000-0000-0000-0693-CA923634953D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6axm_tfeb.z2bk"><intent_id>931792</intent_id><project_id>849303</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2018-09-10T00:00:00</comment_date></row><row _id="row-fmsm~74p4.pc8w" _uuid="00000000-0000-0000-BA6F-216914A54338" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fmsm~74p4.pc8w"><intent_id>521621</intent_id><project_id>689307</project_id><text_data>General Laboer - Run String Line, use shovel, does not drive company vehicleDump Truck = Driver/Dump 6-12 CY and Driver/Dump 12-20CYDump Truck &amp; Trailer = Driver/Truck and Pup</text_data><comment_date>2012-07-11T00:00:00</comment_date></row><row _id="row-x95f_mszj~fx55" _uuid="00000000-0000-0000-68C2-987BC16A79C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x95f_mszj~fx55"><intent_id>1041619</intent_id><project_id>910273</project_id><text_data>Other Truck - 4000 Gal Water Truck</text_data><comment_date>2020-02-27T00:00:00</comment_date></row><row _id="row-33cj_9nn2~4gqe" _uuid="00000000-0000-0000-C8B7-832907DBB3DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-33cj_9nn2~4gqe"><intent_id>616395</intent_id><project_id>729184</project_id><text_data>Fringes:  NWDC - $2.06; Vacation - $1.50; NW Pension - $6.93; National Pension - $4.24; Health Care - $9.78; ITI - $.17; Apprentice Fund - $1.15; Industry Fund - $.65; Org Trust - $.95; NW Supp - $.79</text_data><comment_date>2014-02-14T00:00:00</comment_date></row><row _id="row-3yd6.74ev_qhf3" _uuid="00000000-0000-0000-535B-E5503F810001" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3yd6.74ev_qhf3"><intent_id>486946</intent_id><project_id>670533</project_id><text_data>11-P172; 11-F133</text_data><comment_date>2011-11-01T00:00:00</comment_date></row><row _id="row-36h4_ttsc~p3j3" _uuid="00000000-0000-0000-4427-E5E8A53A060B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-36h4_ttsc~p3j3"><intent_id>715848</intent_id><project_id>770459</project_id><text_data>GeoEngineers File No. 0522-028-00</text_data><comment_date>2015-08-20T00:00:00</comment_date></row><row _id="row-qg7c_fy9m-j8mr" _uuid="00000000-0000-0000-6D30-7B7DADD7988A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qg7c_fy9m-j8mr"><intent_id>785556</intent_id><project_id>801015</project_id><text_data>Filed by Anne PrestonThis project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2016-08-26T00:00:00</comment_date></row><row _id="row-ixgj-u8bd-v324" _uuid="00000000-0000-0000-3A97-26B19829ED98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ixgj-u8bd-v324"><intent_id>679019</intent_id><project_id>755606</project_id><text_data>The truck operated in the Truck Drivers/Other Trucks classification is an International water truck, GWT 20000 used for flushing streets.</text_data><comment_date>2015-02-12T00:00:00</comment_date></row><row _id="row-5wi6-vbip_nfva" _uuid="00000000-0000-0000-19E1-5D76B2BA0DAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5wi6-vbip_nfva"><intent_id>625148</intent_id><project_id>733086</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NODIRK HIGBEE202 27TH AVE SE PUYALLUP WA 98374</text_data><comment_date>2014-04-16T00:00:00</comment_date></row><row _id="row-q82a-a2yj_c882" _uuid="00000000-0000-0000-515B-D290ED022FC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q82a-a2yj_c882"><intent_id>757552</intent_id><project_id>759048</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2016-04-20T00:00:00</comment_date></row><row _id="row-dsc8~5fu2~9n3v" _uuid="00000000-0000-0000-556D-E95D36EF7DAF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dsc8~5fu2~9n3v"><intent_id>460452</intent_id><project_id>665588</project_id><text_data>Other trucks are street sweepers.  Just like on all of our other Intents and Affidavits.</text_data><comment_date>2011-06-27T00:00:00</comment_date></row><row _id="row-xb7e_daid_rmaw" _uuid="00000000-0000-0000-0B5C-59143042E13C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xb7e_daid_rmaw"><intent_id>552046</intent_id><project_id>702451</project_id><text_data>General Laborer-common work-  assist with start up and clean upOther Trucks- 4000 gallon water truck</text_data><comment_date>2013-01-15T00:00:00</comment_date></row><row _id="row-3deu~5m3q~6ijk" _uuid="00000000-0000-0000-F488-DB527A90320A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3deu~5m3q~6ijk"><intent_id>664279</intent_id><project_id>741683</project_id><text_data>302 east n st Yakima,wa 98901 1. install 2 bath fans 2. single family mobile 3. 1 level 4a. no b. no c. yes d. no e. no f. no g. no h. no I. no j. no k. no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2014-11-05T00:00:00</comment_date></row><row _id="row-2ys8~hzew-rast" _uuid="00000000-0000-0000-6D93-DC262F07A49C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ys8~hzew-rast"><intent_id>567484</intent_id><project_id>710103</project_id><text_data>Several manufactured homes in Crestwood MHP</text_data><comment_date>2013-05-01T00:00:00</comment_date></row><row _id="row-xbx5_d2uj.ujvx" _uuid="00000000-0000-0000-D8E7-69ED25525049" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xbx5_d2uj.ujvx"><intent_id>807035</intent_id><project_id>799659</project_id><text_data>NEESER HIRED US</text_data><comment_date>2016-12-14T00:00:00</comment_date></row><row _id="row-fg7d.xfrb_hrwx" _uuid="00000000-0000-0000-78E7-75E0CECCA2FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fg7d.xfrb_hrwx"><intent_id>517873</intent_id><project_id>690013</project_id><text_data>End dump, haul debris</text_data><comment_date>2012-06-29T00:00:00</comment_date></row><row _id="row-rw8x_au23_pd32" _uuid="00000000-0000-0000-B793-3ECA1E676E7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rw8x_au23_pd32"><intent_id>1254047</intent_id><project_id>1024496</project_id><text_data>Workers Comp thru Saif #858202</text_data><comment_date>2022-08-01T00:00:00</comment_date></row><row _id="row-msc8~upki-dwny" _uuid="00000000-0000-0000-BD6A-21C76C237A57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-msc8~upki-dwny"><intent_id>1151336</intent_id><project_id>904480</project_id><text_data>1008813.1008890</text_data><comment_date>2021-06-10T00:00:00</comment_date></row><row _id="row-za5w.v38t~7cfq" _uuid="00000000-0000-0000-B22C-CEF83073F51E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-za5w.v38t~7cfq"><intent_id>1129043</intent_id><project_id>954418</project_id><text_data>#1-We were contracted to REPLACE the furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2021-03-16T00:00:00</comment_date></row><row _id="row-ktmy~5wyn-aiwp" _uuid="00000000-0000-0000-1B22-035DB2890E44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ktmy~5wyn-aiwp"><intent_id>521541</intent_id><project_id>689648</project_id><text_data>Synthetic Sports Surfacing on Running Track</text_data><comment_date>2012-07-11T00:00:00</comment_date></row><row _id="row-wucj_j4yc~icxy" _uuid="00000000-0000-0000-EA63-63BA9826C446" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wucj_j4yc~icxy"><intent_id>634807</intent_id><project_id>736727</project_id><text_data>Fringe breakdown:Health Security			$6.77Pension				$9.95Apprenticeship			  $.63Annuity				$4.00IMPACT				$0.28Total Hourly Fringes		          $21.63</text_data><comment_date>2014-06-12T00:00:00</comment_date></row><row _id="row-5fva.466y.a4fz" _uuid="00000000-0000-0000-3A16-16B0A5D086CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fva.466y.a4fz"><intent_id>709945</intent_id><project_id>673648</project_id><text_data>Fringe Benefit total is $29.43 per hour and the Union fringe breakout is:  A/A .72; Admin .17; Annuity .40; H&amp;W 10.99; Ind.Stab. .06; MarketArea .11; Pension .7u8; Retirement/Welfare 2.29; Vacation 3.91</text_data><comment_date>2015-08-11T00:00:00</comment_date></row><row _id="row-5fc2~85m3_ze8a" _uuid="00000000-0000-0000-211A-9D886CF7D738" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fc2~85m3_ze8a"><intent_id>759528</intent_id><project_id>790850</project_id><text_data>Workers Keith Burrell and Mike Poe 1.Minor home repair 2.SFD 3. One 4a,b no c,yes d,e,f,g,h,I,j, no 5,6,yes 7,8 no.</text_data><comment_date>2016-05-01T00:00:00</comment_date></row><row _id="row-y5b7~4chc-hski" _uuid="00000000-0000-0000-8B92-43367972D280" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5b7~4chc-hski"><intent_id>902295</intent_id><project_id>848678</project_id><text_data>***SELF-INSURED***GENERAL LABORER: Performs work of shoveling with a hand shovel, cleaning/sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket and hand broom.OTHER TRUCKS: A Low Boy trailer used for delivery and pick up of equipment.</text_data><comment_date>2018-05-03T00:00:00</comment_date></row><row _id="row-d44n-e7jn_sptu" _uuid="00000000-0000-0000-4F01-7FADDF8C3221" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d44n-e7jn_sptu"><intent_id>1277011</intent_id><project_id>1036606</project_id><text_data>Objective: Fill approximately 300LF of cracks in the asphalt base with Sikaflex polyurethane sealant and two-component polyurethane. Topcoat all high-wear and damaged areas of the track surface. Some of the tools that will be used are, shovels, brooms, masking tape, wheel barrows, measuring Tapes, Levels, and other safety equipment to keep the children, workers and public safe.</text_data><comment_date>2022-10-21T00:00:00</comment_date></row><row _id="row-q4js.mj8k-jehg" _uuid="00000000-0000-0000-B640-0DF1C714AA89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q4js.mj8k-jehg"><intent_id>685378</intent_id><project_id>758316</project_id><text_data>Job # 9022301</text_data><comment_date>2015-03-24T00:00:00</comment_date></row><row _id="row-bfzn-bpdc_xq77" _uuid="00000000-0000-0000-DEEB-FEF58D21535F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bfzn-bpdc_xq77"><intent_id>837065</intent_id><project_id>822958</project_id><text_data>Wage $40.20; District 9 $3.37; Edison Pension $7.00; NEBF $1.20; Health &amp; Welfare $9.80; Flex $1.20; Apprenticeship $.80; BLMCC $.20</text_data><comment_date>2017-05-30T00:00:00</comment_date></row><row _id="row-2tvj~bgu4~aavx" _uuid="00000000-0000-0000-52F6-1C6616C9916E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tvj~bgu4~aavx"><intent_id>685282</intent_id><project_id>758273</project_id><text_data>(1)INSULATION, (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO,B-NO,C-YES,D-NO,E-NO,F-NO,G-NO,H-NO,I-NO,J-NO,K-?,(5)YES,(6)YES,(7)NO,(8)NO</text_data><comment_date>2015-03-24T00:00:00</comment_date></row><row _id="row-8b5a.8ikh_hkgv" _uuid="00000000-0000-0000-0369-561B2BEBE9BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8b5a.8ikh_hkgv"><intent_id>967915</intent_id><project_id>850161</project_id><text_data>1) Intermountain West Insulation was hired to provide insulation. 2) Single family home. 3) Single story. 4) a)No B)No C)Yes D-K)No 5)Yes 6)Yes 7)No 8) No</text_data><comment_date>2019-03-27T00:00:00</comment_date></row><row _id="row-eup6~jwwe.7j6n" _uuid="00000000-0000-0000-8637-C43477D7A3B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eup6~jwwe.7j6n"><intent_id>502243</intent_id><project_id>667701</project_id><text_data>**WEST COAST MFG IS A FABRICATION SHOP ONLY AND IS NOT REQUIRED TO HAVE A CONTRACTOR'S LICENSE*****ALL WORK PERFORMED AT WEST COAST MFG 1515 75TH ST SW STE 600 EVERETT WA 98203***</text_data><comment_date>2012-02-29T00:00:00</comment_date></row><row _id="row-iggt.wydg.n7pz" _uuid="00000000-0000-0000-3DC0-69B6A0F46210" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iggt.wydg.n7pz"><intent_id>591565</intent_id><project_id>714157</project_id><text_data>Prime Contractor -Five Rivers Construction Inc (WA UBI# 601542646)Hiring Contractor -Busack Electric Inc (WA UBI# 602703038)SimplexGrinnell -(Our WA UBI# 602113334)</text_data><comment_date>2013-09-04T00:00:00</comment_date></row><row _id="row-6kp2-nzka~xz3k" _uuid="00000000-0000-0000-59B3-5FD98CB22A15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6kp2-nzka~xz3k"><intent_id>1117914</intent_id><project_id>908062</project_id><text_data>This project consists of two separate portions, the existing clinic and the new clinic. We have two separate contracts with Korsmo, one for each portion. This intent is for the existing clinic.</text_data><comment_date>2021-01-26T00:00:00</comment_date></row><row _id="row-e23j_asyh~2s23" _uuid="00000000-0000-0000-AB7F-B7CD0542B6D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e23j_asyh~2s23"><intent_id>814580</intent_id><project_id>811312</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2017-02-06T00:00:00</comment_date></row><row _id="row-dtvg.79wg~5p77" _uuid="00000000-0000-0000-667F-D8BC5D393934" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dtvg.79wg~5p77"><intent_id>687649</intent_id><project_id>759346</project_id><text_data>We are not sure, at this point, if we will have subcontractors or not.</text_data><comment_date>2015-04-06T00:00:00</comment_date></row><row _id="row-vfy9-u3h9-y6at" _uuid="00000000-0000-0000-D7C8-A6BD76412F8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfy9-u3h9-y6at"><intent_id>1148479</intent_id><project_id>964403</project_id><text_data>FRINGE BENEFITS PER HOUR INCLUDE: HEALTH, WELFARE, DENTAL - 9.01;</text_data><comment_date>2021-05-28T00:00:00</comment_date></row><row _id="row-7295.7qcr-h588" _uuid="00000000-0000-0000-DD25-AE61CF3CF70D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7295.7qcr-h588"><intent_id>806621</intent_id><project_id>809113</project_id><text_data>2 Optics will provide labor and materials to install network drops into classrooms 150A and 151A.?	E2 Optics will test and label all cabling install to TIA standards.</text_data><comment_date>2016-12-12T00:00:00</comment_date></row><row _id="row-7uva-dsib-vxsh" _uuid="00000000-0000-0000-87A7-504740D342A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7uva-dsib-vxsh"><intent_id>1243670</intent_id><project_id>1018959</project_id><text_data>sr51682596</text_data><comment_date>2022-06-23T00:00:00</comment_date></row><row _id="row-p3sm-rwe9.zm4j" _uuid="00000000-0000-0000-C2D3-509411278F1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p3sm-rwe9.zm4j"><intent_id>828271</intent_id><project_id>818216</project_id><text_data>L&amp;I Account ID 391,642-02</text_data><comment_date>2017-04-25T00:00:00</comment_date></row><row _id="row-5bwp~cvfm-wrjy" _uuid="00000000-0000-0000-1DD2-225E3FAE514A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bwp~cvfm-wrjy"><intent_id>1246736</intent_id><project_id>1017850</project_id><text_data>GU Job #22213Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2022-07-06T00:00:00</comment_date></row><row _id="row-b7yd.7rug_9stq" _uuid="00000000-0000-0000-ADBF-9EC68C381167" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b7yd.7rug_9stq"><intent_id>992828</intent_id><project_id>848693</project_id><text_data>FILED BY JOSE JARAMILLO</text_data><comment_date>2019-07-18T00:00:00</comment_date></row><row _id="row-khab.e8fx~m828" _uuid="00000000-0000-0000-A9C4-A33727787D1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-khab.e8fx~m828"><intent_id>1014830</intent_id><project_id>895973</project_id><text_data>Correct Company Address:1055 Andover Park ETukwila, WA 98188#1 - Describe the work that your firm was contracted to perform. Take out old windows and replace with new ones. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single #3 - Including any basement or garage, how many stories or levels does the structure have? 1 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no(b) Any retail use in the structure? no(c) Permanent residence only? yes(d) Rehabilitation house? no(e) Transitional housing? no(f) Communal dining facility? no (g) Treatment services? no(h) Assisted living services? no(I) Dormitories? no(j) Counseling? no(k) Is each room and/or bed in the structure rented separately? no(l) Other? no #5 - Does each dwelling unit have its own self-contained kitchen? Yes #6 - Does each dwelling unit have its own bathroom? Yes #7 - Is there a community facility or manager�s office on site? No #8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2019-10-11T00:00:00</comment_date></row><row _id="row-452k-8dpk-92yg" _uuid="00000000-0000-0000-FBA4-72972BF7528A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-452k-8dpk-92yg"><intent_id>519858</intent_id><project_id>689602</project_id><text_data>072037</text_data><comment_date>2012-06-29T00:00:00</comment_date></row><row _id="row-q2mr~9k8p_rcji" _uuid="00000000-0000-0000-DC28-E69471A7307C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q2mr~9k8p_rcji"><intent_id>810677</intent_id><project_id>811006</project_id><text_data>Emergency Furnace Repair</text_data><comment_date>2017-01-10T00:00:00</comment_date></row><row _id="row-zjum_zwix-fs5q" _uuid="00000000-0000-0000-B4C7-E80AD2460E17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zjum_zwix-fs5q"><intent_id>529169</intent_id><project_id>694101</project_id><text_data>DOC has altered the Title of the of the project on our contract.  &amp;quot;WCC - 500,000 Gallon Toro Tank Repair&amp;quot; as titled above is the correct title for the job.</text_data><comment_date>2012-08-20T00:00:00</comment_date></row><row _id="row-dhdg.miff-72wu" _uuid="00000000-0000-0000-D090-6B33671A16F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dhdg.miff-72wu"><intent_id>1068629</intent_id><project_id>920223</project_id><comment_date>2020-06-29T00:00:00</comment_date></row><row _id="row-ayge-rbmc-647s" _uuid="00000000-0000-0000-8E37-70B902A8C6C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ayge-rbmc-647s"><intent_id>815024</intent_id><project_id>803391</project_id><text_data>With noted corrections there were 4 different workers who worked on this project at the journey commercial sheet metal worker rate</text_data><comment_date>2017-02-17T00:00:00</comment_date></row><row _id="row-ecce.3tda~qt4k" _uuid="00000000-0000-0000-CCD1-7E97A080880B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ecce.3tda~qt4k"><intent_id>985273</intent_id><project_id>884518</project_id><text_data>117512-001</text_data><comment_date>2019-06-17T00:00:00</comment_date></row><row _id="row-ayk7_97p6_8dq9" _uuid="00000000-0000-0000-8F6A-4043FA65A091" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ayk7_97p6_8dq9"><intent_id>1465839</intent_id><project_id>1140654</project_id><text_data>1.Weatherization 2. single family 3. 1 4.a0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-wvbs_shjw~ki8s" _uuid="00000000-0000-0000-1609-C08AB27B37A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wvbs_shjw~ki8s"><intent_id>761263</intent_id><project_id>791631</project_id><text_data>Landscape laborers and irrigation installers will use hand tools and landscape equipment ( Bob cat, mini excavators) less than 50 horse power. Landscape workers will install lawn irrigation less than 20&amp;quot; deep and plan trees, bushes and ground covers.</text_data><comment_date>2016-06-09T00:00:00</comment_date></row><row _id="row-7vwb.ywhy~e7w7" _uuid="00000000-0000-0000-42D8-464B6C79C87B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7vwb.ywhy~e7w7"><intent_id>637392</intent_id><project_id>737977</project_id><text_data>Laborer Fringe: Health &amp; Welfare $5.70, Pension $6.40, Training $1.00, CIDFWP $.13, PWLE $.02, CAF $.05, LECET $.10. ( Per Laborer's Union)PEO Fringe: Health &amp; Welfare $8.10, Pension Def Benefit $4.00, Def Contribution $1.00, Training $.60, CAF $.05, CIP $.03 ( Per Operator's Union)</text_data><comment_date>2014-06-26T00:00:00</comment_date></row><row _id="row-v66w-f53m.w3yc" _uuid="00000000-0000-0000-ABC5-D2585442297F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v66w-f53m.w3yc"><intent_id>561951</intent_id><project_id>668857</project_id><text_data>please note - this intent replaces approved intent #496983 - please delete approved intent #496983 - we did have an employee on site.  Thank you!!</text_data><comment_date>2013-03-28T00:00:00</comment_date></row><row _id="row-3yk5-pyca.hx7m" _uuid="00000000-0000-0000-D758-1F021E5BDD75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3yk5-pyca.hx7m"><intent_id>1127752</intent_id><project_id>945669</project_id><text_data>204705-002</text_data><comment_date>2021-03-10T00:00:00</comment_date></row><row _id="row-mz7c.gzbp~fd4v" _uuid="00000000-0000-0000-5541-CCF6262A41E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mz7c.gzbp~fd4v"><intent_id>1058938</intent_id><project_id>912121</project_id><text_data>Other Truck - Water TruckOther Truck - Lowboy low bed heavy duty trailer</text_data><comment_date>2020-05-19T00:00:00</comment_date></row><row _id="row-qftz.fxk6~mrb7" _uuid="00000000-0000-0000-8FCA-B7747B81C1F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qftz.fxk6~mrb7"><intent_id>486443</intent_id><project_id>599129</project_id><text_data>Purcell job #11129</text_data><comment_date>2011-10-28T00:00:00</comment_date></row><row _id="row-eimu~swdm.rpzb" _uuid="00000000-0000-0000-093C-B2DFBD3732CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eimu~swdm.rpzb"><intent_id>1018253</intent_id><project_id>884973</project_id><text_data>We sprayed the surface of the dirt with grass seed and tack to make it stick. No digging, no shoveling, no lifting, no trenching, and nothing to do with water systems.</text_data><comment_date>2019-11-11T00:00:00</comment_date></row><row _id="row-yhds_b48p-f4rx" _uuid="00000000-0000-0000-D58C-2F95EFE67702" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yhds_b48p-f4rx"><intent_id>681479</intent_id><project_id>742172</project_id><text_data>Filed by Michael HummelState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form-Clark College STEM Building Prevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.)What is the specific purpose of this awarding agency�s public works project?New construction of classroom lab building on the Clark College campus.2.)Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No. 3.)Does this project entail the remodeling or new construction of a facility?Yes, but not performed by Siemens Employees.4.)If your firm is working upon a type of building system, what type of system is involved? HVAC control system, fire alarm and security systems. 5.)What specific tasks will your employees use in the performance of those tasks?Siemens� BAU (HVAC) Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. Siemens� FIS &amp; SES (Fire alarm and security) Technicians, perform their work strictly on laptop computers, both remotely and on-site during the commissioning process. While off-site, the FIS Technicians update program configurations and point inputs. The FIS Technician typically sits in at control panel and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the system is operating properly, the FIS Technician trains the end-user about system functionality, again using a computer interface. Importantly, FIS Technicians do not use trade tools, such as drills or wrenches. 6.)What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.)If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.)Are you going to be hiring any subcontractors for this project?No.To expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2015-03-02T00:00:00</comment_date></row><row _id="row-cqyt.jtca-af5p" _uuid="00000000-0000-0000-3209-FCF2B4E52DBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqyt.jtca-af5p"><intent_id>496568</intent_id><project_id>671065</project_id><text_data>Computer programming, training and graphic itegration for supplied lighting controllers</text_data><comment_date>2012-01-19T00:00:00</comment_date></row><row _id="row-7627~5tmx.ccsp" _uuid="00000000-0000-0000-3AF5-53C19DB1E590" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7627~5tmx.ccsp"><intent_id>935245</intent_id><project_id>860979</project_id><text_data>1218040</text_data><comment_date>2018-09-25T00:00:00</comment_date></row><row _id="row-xxjj-dy8d_qweg" _uuid="00000000-0000-0000-075E-9508A4924E66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xxjj-dy8d_qweg"><intent_id>514588</intent_id><project_id>687889</project_id><text_data>I already sent this info</text_data><comment_date>2012-06-08T00:00:00</comment_date></row><row _id="row-d4ya~8zwj-5u7t" _uuid="00000000-0000-0000-4435-F7E553D61737" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4ya~8zwj-5u7t"><intent_id>633648</intent_id><project_id>724946</project_id><text_data>From: aarone@superiorglazingsolutions.com [mailto:aarone@superiorglazingsolutions.com] Sent: Friday, July 25, 2014 2:20 PMTo: Garcia, Tonia (LNI)Subject: RE: Intent 633648 - Valli Kee Office RenovationTonia,  Thanks for correcting this. The Hiring contractor is Express Construction. They are the general contractor for the Valli Kee project.Thanks, Aaron</text_data><comment_date>2014-07-25T00:00:00</comment_date></row><row _id="row-pxjh_2mcg~je6h" _uuid="00000000-0000-0000-3A15-1D73A2DCF73C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pxjh_2mcg~je6h"><intent_id>1112339</intent_id><project_id>897827</project_id><text_data>Award date corrected to 10/01/18.</text_data><comment_date>2021-01-12T00:00:00</comment_date></row><row _id="row-kp3w_98sc_3rz4" _uuid="00000000-0000-0000-76D1-B24493F479CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kp3w_98sc_3rz4"><intent_id>486181</intent_id><project_id>677131</project_id><text_data>Prairie Electric, Inc.�s fringe packages only include Health Plan, Vacation Plan, Holiday Plan, Pension Plan, and Apprentice Program.</text_data><comment_date>2011-10-27T00:00:00</comment_date></row><row _id="row-cm2u_t3hg~vime" _uuid="00000000-0000-0000-67E6-C72237708B3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cm2u_t3hg~vime"><intent_id>681508</intent_id><project_id>756696</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-03-02T00:00:00</comment_date></row><row _id="row-cwbz-ect8~x7ws" _uuid="00000000-0000-0000-DFA1-2BFA04AECD4E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cwbz-ect8~x7ws"><intent_id>1206209</intent_id><project_id>993421</project_id><text_data>WRI JOB# 22.850/47284</text_data><comment_date>2022-01-21T00:00:00</comment_date></row><row _id="row-3cpe_xyzj.4nvi" _uuid="00000000-0000-0000-865D-B2EBFB1D1FD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3cpe_xyzj.4nvi"><intent_id>824103</intent_id><project_id>817091</project_id><text_data>Client:  Dayley1.  Install ERV ventilation fan2.  single family3.  14.  a. no b. no c. yes d. no e. no f. no g. no h. no i. no j. no k. no5.  yes6.  yes7.  no8.  no</text_data><comment_date>2017-04-03T00:00:00</comment_date></row><row _id="row-r549_wji9~xy8m" _uuid="00000000-0000-0000-E2F6-0E0A5133D914" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r549_wji9~xy8m"><intent_id>674763</intent_id><project_id>753670</project_id><text_data>1)We were contracted to repair the gas furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2015-01-15T00:00:00</comment_date></row><row _id="row-mwhy_xbjc_tvmi" _uuid="00000000-0000-0000-DF74-ACE866CE967F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mwhy_xbjc_tvmi"><intent_id>1190548</intent_id><project_id>986446</project_id><comment_date>2021-11-03T00:00:00</comment_date></row><row _id="row-eqpr.8iqw-r5kw" _uuid="00000000-0000-0000-5233-C14850186E11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eqpr.8iqw-r5kw"><intent_id>709107</intent_id><project_id>768018</project_id><text_data>City of Seattle JOC ContractContract # 2014-043AWork Order # 2014-616</text_data><comment_date>2015-07-22T00:00:00</comment_date></row><row _id="row-2mwd~fjm3-577q" _uuid="00000000-0000-0000-5592-1CDDF334363C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2mwd~fjm3-577q"><intent_id>986545</intent_id><project_id>885187</project_id><text_data>Prime Job# 3001205</text_data><comment_date>2019-06-21T00:00:00</comment_date></row><row _id="row-tzu5-93j2_h994" _uuid="00000000-0000-0000-0AF3-217561CCF819" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzu5-93j2_h994"><intent_id>1156409</intent_id><project_id>963864</project_id><text_data>1N59-0132</text_data><comment_date>2021-06-29T00:00:00</comment_date></row><row _id="row-9dhq-48yd-nw23" _uuid="00000000-0000-0000-7BC6-68CCCD6F7AC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9dhq-48yd-nw23"><intent_id>592860</intent_id><project_id>716564</project_id><text_data>Filed by Vicki Anderson.</text_data><comment_date>2013-09-10T00:00:00</comment_date></row><row _id="row-3fgz~jan7.dryd" _uuid="00000000-0000-0000-BC75-3FE61ABFF5BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3fgz~jan7.dryd"><intent_id>885063</intent_id><project_id>842218</project_id><text_data>PC6 - job #901-36Invoices:66002083,66002082,66002079CB</text_data><comment_date>2018-01-25T00:00:00</comment_date></row><row _id="row-xjhp.fprc.jcbs" _uuid="00000000-0000-0000-7187-48BB695E7C63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xjhp.fprc.jcbs"><intent_id>989405</intent_id><project_id>886264</project_id><text_data>1219017</text_data><comment_date>2019-07-03T00:00:00</comment_date></row><row _id="row-3h55_dyat.cbme" _uuid="00000000-0000-0000-4DA1-8EEAF47097F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3h55_dyat.cbme"><intent_id>1035186</intent_id><project_id>869411</project_id><text_data>Owner/Technician</text_data><comment_date>2020-01-31T00:00:00</comment_date></row><row _id="row-gify-3zz2-duhp" _uuid="00000000-0000-0000-341A-D0B692EECEFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gify-3zz2-duhp"><intent_id>508255</intent_id><project_id>675311</project_id><text_data>Filed by: Liza Bufete -boyi235</text_data><comment_date>2012-04-18T00:00:00</comment_date></row><row _id="row-t2q4.smtm~ex5p" _uuid="00000000-0000-0000-757B-79089A9F63B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t2q4.smtm~ex5p"><intent_id>1175247</intent_id><project_id>970032</project_id><text_data>We are a subcontractor for Advanced Excavating Specialists, LLC. They have been hired to improve the athletic surfaces at Heritage High School. We are pressure washing the tennis court surfaces as needed. We are also patching and repairing cracks and then resurfacing the entire court surface. Once we make sure the tennis surface is safe and level, we will spray paint lines on the courts for tennis. We are also supplying and installing net post sleeves, net posts, center anchor, nets and center strap. Our crews use the following tools: squeegee, trowels, power mixer, buckets, tapes, power washers and shovels.</text_data><comment_date>2021-09-06T00:00:00</comment_date></row><row _id="row-wd94_2uj5-fqei" _uuid="00000000-0000-0000-FDBB-40CA1BFA35F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wd94_2uj5-fqei"><intent_id>1195212</intent_id><project_id>967937</project_id><text_data>We will be providing and installing gymnasium equipment, which is permanent to the building.</text_data><comment_date>2021-11-23T00:00:00</comment_date></row><row _id="row-xtft_ry8w~qpi5" _uuid="00000000-0000-0000-137F-CC375BD31C31" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xtft_ry8w~qpi5"><intent_id>605746</intent_id><project_id>721091</project_id><text_data>earthwork, site prep, seeding &amp; plants, sewer/water.</text_data><comment_date>2013-12-23T00:00:00</comment_date></row><row _id="row-na6n~2mc6_ju32" _uuid="00000000-0000-0000-0143-287D5FFE5C90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-na6n~2mc6_ju32"><intent_id>1071611</intent_id><project_id>925141</project_id><text_data>maint, repair,extra 07-01-20 -01-01-22tacoma</text_data><comment_date>2020-07-13T00:00:00</comment_date></row><row _id="row-e27q-qer8.a6bh" _uuid="00000000-0000-0000-BBDD-0BC30F79D5EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e27q-qer8.a6bh"><intent_id>629684</intent_id><project_id>731674</project_id><text_data>Form filed by: Lynn Morgan</text_data><comment_date>2014-05-14T00:00:00</comment_date></row><row _id="row-3qna~y2ah_x85y" _uuid="00000000-0000-0000-8C2C-F38DD612021F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3qna~y2ah_x85y"><intent_id>997738</intent_id><project_id>885783</project_id><text_data>200388</text_data><comment_date>2019-08-07T00:00:00</comment_date></row><row _id="row-ywpr.fxc9_99qd" _uuid="00000000-0000-0000-FC73-81710EE000B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ywpr.fxc9_99qd"><intent_id>997578</intent_id><project_id>883039</project_id><text_data>Tamara Oneal225 East Cedar St.Othello, WA 99344</text_data><comment_date>2019-08-06T00:00:00</comment_date></row><row _id="row-t6su.cgbc~bn2h" _uuid="00000000-0000-0000-8D60-00B895E2C39E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t6su.cgbc~bn2h"><intent_id>1112678</intent_id><project_id>945146</project_id><text_data>Centennial project # 74300-0008</text_data><comment_date>2020-12-31T00:00:00</comment_date></row><row _id="row-d45w.f9qh-9u4u" _uuid="00000000-0000-0000-9426-0ABCCDCECFB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d45w.f9qh-9u4u"><intent_id>1208309</intent_id><project_id>997594</project_id><text_data>Laborers will be picking up trash and putting in dumpsters they will not use tools or vehicles</text_data><comment_date>2022-03-08T00:00:00</comment_date></row><row _id="row-ksge-fxcc~fv8u" _uuid="00000000-0000-0000-A661-EDF96420DAF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ksge-fxcc~fv8u"><intent_id>987141</intent_id><project_id>885409</project_id><text_data>#1 � The crew will be installing a heat pump.#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2019-06-24T00:00:00</comment_date></row><row _id="row-n2cw-gpju~ejis" _uuid="00000000-0000-0000-0DAE-991E23B65524" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2cw-gpju~ejis"><intent_id>739720</intent_id><project_id>781762</project_id><text_data>This project is being done for: Central Washington Comprehensive Mental Health                                402 S. 4th Avenue                                Yakima, WA 98902</text_data><comment_date>2015-12-30T00:00:00</comment_date></row><row _id="row-3dek-ziyf~qsg6" _uuid="00000000-0000-0000-09D5-D312E55E62D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3dek-ziyf~qsg6"><intent_id>898652</intent_id><project_id>848340</project_id><text_data>1.-General construction.2.-Single family.3.-1 level4.-a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-no.5.-yes6.-yes7.-no8.-no.</text_data><comment_date>2018-04-14T00:00:00</comment_date></row><row _id="row-bkzz-iyfi-y65t" _uuid="00000000-0000-0000-D541-8150D5B45A53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bkzz-iyfi-y65t"><intent_id>651370</intent_id><project_id>743150</project_id><text_data>Moved telephone jacks in the Heart Center Building</text_data><comment_date>2014-08-28T00:00:00</comment_date></row><row _id="row-8g8a_rb6u-7j2m" _uuid="00000000-0000-0000-076C-FE47300D14C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8g8a_rb6u-7j2m"><intent_id>1262726</intent_id><project_id>1028896</project_id><text_data>All work done by Zellerhoff. Repaired water line leak. Dig up water line, patch in and repair broken steel pipe. Haul out mud, place crush rock, cover line.</text_data><comment_date>2022-09-20T00:00:00</comment_date></row><row _id="row-vt4e-hthh_arki" _uuid="00000000-0000-0000-ECD5-9CAB311ABD59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vt4e-hthh_arki"><intent_id>971132</intent_id><project_id>878233</project_id><text_data>#1-We were contracted to diagnose and repair heat. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2019-04-11T00:00:00</comment_date></row><row _id="row-yyib~wi64_6b42" _uuid="00000000-0000-0000-CACD-C1AFD32B1259" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yyib~wi64_6b42"><intent_id>1103714</intent_id><project_id>940106</project_id><text_data>General labor work consists of hand work (shovel work) no power equipment or power tools. Blade Operator is used for grading the project site for compaction before paving and/or chip sealing operations. Other trucks consist of a 0-8,000 gallon water truck used for water distribution during the grading process to help with compaction. Crane Oiler � the actual piece of equipment being operated is an Oil Distributor truck and the wage band approach was utilized, as per Harvey Means from L&amp;I.</text_data><comment_date>2020-11-16T00:00:00</comment_date></row><row _id="row-c47v~sany-d2tp" _uuid="00000000-0000-0000-4A66-C8C21A0A5C4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c47v~sany-d2tp"><intent_id>895614</intent_id><project_id>799211</project_id><text_data>The landscape workers will use landscape equipment to place trees, shrubs and ground covers and placement of bark and topsoil. Workers will use hand tools and landscape equipment.</text_data><comment_date>2018-05-10T00:00:00</comment_date></row><row _id="row-cg98-25g4~vte6" _uuid="00000000-0000-0000-95B9-DE027D286851" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cg98-25g4~vte6"><intent_id>498019</intent_id><project_id>681815</project_id><text_data>Maintenance for: Weeding, Pruning, Planter Beds, Edging, Trimming, Fertilizer, Sweeping, Leaf BlowingEquipment Used: Weed-Eater, Sheers, Shovels, Rakes, Edges, Brooms, Leaf Blower</text_data><comment_date>2012-01-25T00:00:00</comment_date></row><row _id="row-psjx-mn8m_dv4h" _uuid="00000000-0000-0000-B076-81345D37F42D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-psjx-mn8m_dv4h"><intent_id>596517</intent_id><project_id>670458</project_id><text_data>093047</text_data><comment_date>2013-09-27T00:00:00</comment_date></row><row _id="row-yzxj_wbtf-aup3" _uuid="00000000-0000-0000-1907-2EFEC955B95F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yzxj_wbtf-aup3"><intent_id>808433</intent_id><project_id>809938</project_id><text_data>Various repairs, installation and maintenance at the following addresses;8025 So D St, Tacoma, 98408716 So J St, Tacoma, WA 984024625 So K St, Tacoma, WA 984087021 So Puget Sound, Tacoma, WA 984093112 Viewmount, Tacoma, WA 98407814 So Washington, Tacoma, WA 984053028 E J St, Tacoma, WA 984045001 So M St, Tacoma, WA 98408</text_data><comment_date>2016-12-22T00:00:00</comment_date></row><row _id="row-3u5d.2r7s.9pw8" _uuid="00000000-0000-0000-5B4E-56C38A147917" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3u5d.2r7s.9pw8"><intent_id>1132227</intent_id><project_id>951509</project_id><text_data>$31.53 Fringe package includes: $9.16 health, $11.00 pension, $7.95 annuity, $2.40 paid time off, $0.74 apprenticeship, $0.28 impact</text_data><comment_date>2021-03-29T00:00:00</comment_date></row><row _id="row-cki7.b8mt.zqtc" _uuid="00000000-0000-0000-B227-66C2CB125AD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cki7.b8mt.zqtc"><intent_id>620558</intent_id><project_id>670970</project_id><text_data>Our customer hired us to supply, deliver and install bark and/or compost material.  Our Landscape Construction Laborer is spreading bark and/or compost to a depth of 3 to 4 inches.</text_data><comment_date>2014-03-17T00:00:00</comment_date></row><row _id="row-7dmr.rtjx-bxvj" _uuid="00000000-0000-0000-16A4-44550E66AA3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7dmr.rtjx-bxvj"><intent_id>941592</intent_id><project_id>864774</project_id><text_data>609179405-CWU Bouillon Remodel FA  -  JCI Prime / Hired ARC Electric</text_data><comment_date>2018-10-24T00:00:00</comment_date></row><row _id="row-dgev_yuu5-kadp" _uuid="00000000-0000-0000-5BEB-E3B51A9C0F70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgev_yuu5-kadp"><intent_id>1203371</intent_id><project_id>963831</project_id><text_data>We have changed from an INC to an LLC as o 8/11, our Contract lics has changed to COLUMFL795NJ, old intent # is 1170237</text_data><comment_date>2022-01-07T00:00:00</comment_date></row><row _id="row-xgae-cq85-7ccm" _uuid="00000000-0000-0000-DDF4-1938F2A1B8DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xgae-cq85-7ccm"><intent_id>884420</intent_id><project_id>812323</project_id><text_data>Installation of Category 6 telecom cabling per section 270100,270510.270553, 271511, and 282323. Cat6 cable is to be plenum rated as specified. Siemon Cat6 connectivity hardware shall be used as specified. Installation of 2-post equipment racks, ladder rack, cable managers, and related rack hardware in telecom room 108A</text_data><comment_date>2018-01-22T00:00:00</comment_date></row><row _id="row-k3aq-924u~efu9" _uuid="00000000-0000-0000-DB76-B3AFD9DEBAE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3aq-924u~efu9"><intent_id>844417</intent_id><project_id>808010</project_id><text_data>General landscape maintenance to remove and control invasive plant species by manual removal and herbicide treatment. Plant replacement trees, shrubs, or herbaceous plants as well as potentially re-seeding small areas of the site.</text_data><comment_date>2017-06-29T00:00:00</comment_date></row><row _id="row-qpj4-emap.k948" _uuid="00000000-0000-0000-AB8F-07EC27B53EDE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qpj4-emap.k948"><intent_id>596157</intent_id><project_id>720337</project_id><text_data>LCL HIRED US</text_data><comment_date>2013-09-26T00:00:00</comment_date></row><row _id="row-8uuz~vfpq.f9qm" _uuid="00000000-0000-0000-58CE-1008778BDDD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8uuz~vfpq.f9qm"><intent_id>736922</intent_id><project_id>780449</project_id><text_data>Came in for a leak in the hose faucet. Arrived on site and made contact with Teresa. She was unaware of issue and did not know which faucet. Walked around complex to find a faucet stuck on in the rear of building. We tried to turn it off and would not work. We looked for an isolation valve and or access panel and could not find one. We tracked down a ladder on site and went into suspended ceiling to find any plumbing. Until could not find an isolation valve. Took appropriate measurement from exterior wall and measured partition wall between men�s and women�s to accommodate where the valve was inside. Afterwards we tried to call Mike for approval to cut and could not get a hold of him. Contacted Amber and got approval to cut. A Few minutes later Amber sent us a blueprint of building. Had to pull it up on tablet and found it next to the hole we cut going into the partition wall. We had to drain and pull toilet. We cut a hole in wall and exposed valve. We than found a gate valve in the mechanical room that shuts off parts of the restrooms. We shut it off and tried to solder new ball valve on. Many obstacles were In our way such as electrical conduit and metal braces. Water would not stop coming out of pipe and we had a couple u successful solders. Had to return next day with a new tool that would stop water flow and allow us to solder on a valve. Got pipes prepped and soldered on valve. Installed 3 new access panels. Returned following day and installed repair kit in faucet that we ordered. Checked for leaks and all is good.</text_data><comment_date>2015-12-09T00:00:00</comment_date></row><row _id="row-4q42-wx7d.gb9f" _uuid="00000000-0000-0000-6A35-BD42DF590BD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4q42-wx7d.gb9f"><intent_id>638664</intent_id><project_id>738433</project_id><text_data>Job # S023254</text_data><comment_date>2014-07-02T00:00:00</comment_date></row><row _id="row-4ei9~955u~n479" _uuid="00000000-0000-0000-6309-38EA725880CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ei9~955u~n479"><intent_id>1185753</intent_id><project_id>983823</project_id><text_data>October- GSP- Meadowbrook Playfield- Weed Removal/Fruit Plan WO #89065Hand Pulling and grubbing invasive control and weeding with hand tools</text_data><comment_date>2021-10-15T00:00:00</comment_date></row><row _id="row-7mid-c4pb~bxac" _uuid="00000000-0000-0000-17C5-CA14499F9A16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7mid-c4pb~bxac"><intent_id>1131725</intent_id><project_id>928472</project_id><text_data>Truck Drivers - Other Trucks = LowboyTruck Drivers - Other Trucks = Water truck under 4000 gal</text_data><comment_date>2021-03-26T00:00:00</comment_date></row><row _id="row-gp7p~erqj~9c64" _uuid="00000000-0000-0000-2F24-6AC2798DF82D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gp7p~erqj~9c64"><intent_id>601759</intent_id><project_id>718132</project_id><text_data>Filed by Thia C. Tewalt.</text_data><comment_date>2013-10-28T00:00:00</comment_date></row><row _id="row-w325~xs29~3zw4" _uuid="00000000-0000-0000-6094-936B236B8CC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w325~xs29~3zw4"><intent_id>511476</intent_id><project_id>687503</project_id><text_data>Community Energy Challenge</text_data><comment_date>2012-05-11T00:00:00</comment_date></row><row _id="row-sn6w_rw6a~8pq7" _uuid="00000000-0000-0000-399E-B8F7019D5056" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sn6w_rw6a~8pq7"><intent_id>980633</intent_id><project_id>882348</project_id><text_data>0719041</text_data><comment_date>2019-05-28T00:00:00</comment_date></row><row _id="row-rqeh.cdcw_qhd5" _uuid="00000000-0000-0000-9855-7D7ADF61830A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rqeh.cdcw_qhd5"><intent_id>1137858</intent_id><project_id>929472</project_id><text_data>1221015</text_data><comment_date>2021-04-22T00:00:00</comment_date></row><row _id="row-mwwx_2scp-cg3z" _uuid="00000000-0000-0000-7768-62B519F76397" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mwwx_2scp-cg3z"><intent_id>578312</intent_id><project_id>713175</project_id><text_data>Filed by: Brenda Lumsden</text_data><comment_date>2013-06-28T00:00:00</comment_date></row><row _id="row-qha3~943g~t2s4" _uuid="00000000-0000-0000-1679-8F50A3C886AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qha3~943g~t2s4"><intent_id>1312882</intent_id><project_id>1059144</project_id><text_data>Installed windowsSchoolnoA. noB. noC. noD. noE. noF. NOG. NOH. NOI. NOJ. NOK. NOI NO   5.	NOYES</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-ephb_v2gb_fhgd" _uuid="00000000-0000-0000-352B-29A7A10EC0DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ephb_v2gb_fhgd"><intent_id>898095</intent_id><project_id>848109</project_id><text_data>Access Control Installation</text_data><comment_date>2018-04-11T00:00:00</comment_date></row><row _id="row-erut~5a3v_mtb2" _uuid="00000000-0000-0000-17AC-F7B03E30846C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-erut~5a3v_mtb2"><intent_id>795551</intent_id><project_id>758006</project_id><text_data>charles harrington : owner operatorApprentice: Wage-$30.38, 33.98, 36.98 : Health-$9.01 per hour : Wa. State Pension-$2.51 : National Pension-$1.37 per hour : Industry Improvement-$.35 per hour : JATC-$1.88 per hour : Supplemental Pension-$4.25 per hour.Journeyman: Wage-$51.97 ($46.77 wage + $4.00 vacation + $1.20 assessment check off): Health-$9.01 per hour : Wa. State Pension-$4.56 : National Pension-$2.49 per hour : Industry Improvement-$.35 per hour : JATC-$1.63 per hour : Supplemental Pension-$4.25 per hour</text_data><comment_date>2016-10-12T00:00:00</comment_date></row><row _id="row-tsyv.7bjq-atkc" _uuid="00000000-0000-0000-7018-38FE735FBC70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsyv.7bjq-atkc"><intent_id>799365</intent_id><project_id>806330</project_id><text_data>C&amp;R Tractor and Landscaping will provide landscape maintenance service to the district building and surrounding pump stations. We will be applying bark and raking leaves, mowing grass using push behind lawn mowers, trimming shrubs and trees using hand tools.</text_data><comment_date>2016-11-02T00:00:00</comment_date></row><row _id="row-h8c8~d362.iiqb" _uuid="00000000-0000-0000-DA48-C63D42569FE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h8c8~d362.iiqb"><intent_id>591247</intent_id><project_id>710650</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.</text_data><comment_date>2013-09-03T00:00:00</comment_date></row><row _id="row-tpd8-v7i6-a2i4" _uuid="00000000-0000-0000-B5E2-DE3EC534C4D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tpd8-v7i6-a2i4"><intent_id>927426</intent_id><project_id>859385</project_id><text_data>PC6 - Job 6308PO #1600002454CB</text_data><comment_date>2018-08-22T00:00:00</comment_date></row><row _id="row-fiza_wcen_kna7" _uuid="00000000-0000-0000-0787-23E7378262CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fiza_wcen_kna7"><intent_id>1127866</intent_id><project_id>951566</project_id><comment_date>2021-03-10T00:00:00</comment_date></row><row _id="row-bybd_8qet_iny6" _uuid="00000000-0000-0000-1C89-AA3F6D6673E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bybd_8qet_iny6"><intent_id>583293</intent_id><project_id>706803</project_id><text_data>Form filed by: Aaron B Hammer</text_data><comment_date>2013-07-25T00:00:00</comment_date></row><row _id="row-c9df~g9vj_pthz" _uuid="00000000-0000-0000-4DE1-78361D5A8DAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9df~g9vj_pthz"><intent_id>957748</intent_id><project_id>856484</project_id><text_data>Filed by Treavina Cuthbertson - Project is exempt from state prevailing wage requirements based on housing act of 1937 and CFR 965.101. Workers will be paid in accordance with davis bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2019-01-30T00:00:00</comment_date></row><row _id="row-vbus-yj5t.6drc" _uuid="00000000-0000-0000-A482-B7BD1C742CEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vbus-yj5t.6drc"><intent_id>742502</intent_id><project_id>783078</project_id><text_data>1)HVAC Service, 2) Single Family Residence, 3) One level , 4) A)NO, B)NO, C)YES, D)NO, E)NO, F)NO, G)NO, H)NO, I)NO, J)NO, 5) one kitchen in residence, 6) one bathroom in home,  7) No, 8) No</text_data><comment_date>2016-01-20T00:00:00</comment_date></row><row _id="row-yswk-3ky2_m4mt" _uuid="00000000-0000-0000-A762-0AD370CBA9CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yswk-3ky2_m4mt"><intent_id>617860</intent_id><project_id>716376</project_id><text_data>1) window and siding installation2)apartment3)2 levels4)permanent residence5)yes6)yes7)do not know8)no</text_data><comment_date>2014-02-26T00:00:00</comment_date></row><row _id="row-4ds8-k8su~wjct" _uuid="00000000-0000-0000-C8F6-31B827572154" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ds8-k8su~wjct"><intent_id>563145</intent_id><project_id>697285</project_id><text_data>Owner will be in doing any camera inspections needed on this job.WA State Operator and Laborer wage rates are higher than listed in the Federal rates.  State wage rate has been applied.</text_data><comment_date>2013-04-04T00:00:00</comment_date></row><row _id="row-w8s8.5yj4~cuaj" _uuid="00000000-0000-0000-ABD3-46AE6141E3CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w8s8.5yj4~cuaj"><intent_id>708890</intent_id><project_id>767720</project_id><text_data>Job # 102211-001 related to 20960-002</text_data><comment_date>2015-07-21T00:00:00</comment_date></row><row _id="row-qryd.kkv2~jjbx" _uuid="00000000-0000-0000-0E9C-A6CCC7C8E2CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qryd.kkv2~jjbx"><intent_id>1271658</intent_id><project_id>1033766</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT. IT IS A SINGLE FAMILY RESIDENTIAL DWELLING.</text_data><comment_date>2022-10-03T00:00:00</comment_date></row><row _id="row-xzr7_68pg_3vui" _uuid="00000000-0000-0000-43FC-BC8D0D13D317" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xzr7_68pg_3vui"><intent_id>984101</intent_id><project_id>879479</project_id><text_data>CONCRETE READY MIX DELIVERIES</text_data><comment_date>2019-06-12T00:00:00</comment_date></row><row _id="row-dq4i_7aqt~wuyx" _uuid="00000000-0000-0000-066B-436BA418A82A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dq4i_7aqt~wuyx"><intent_id>944493</intent_id><project_id>848187</project_id><text_data>Indoor TI work -  Cat 6 Structured Cabling</text_data><comment_date>2018-11-07T00:00:00</comment_date></row><row _id="row-gbzf~9cte~xdih" _uuid="00000000-0000-0000-B3F8-08D88683CF78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbzf~9cte~xdih"><intent_id>1072076</intent_id><project_id>925322</project_id><text_data>Data cablinginside workElect tech(06)provide and install 7 dual data outlets and 1 single drop for a WAP for the Capital Project Portable A</text_data><comment_date>2020-07-14T00:00:00</comment_date></row><row _id="row-8jtx-7rag_yg5d" _uuid="00000000-0000-0000-0CEF-E0C8EFB9D2C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8jtx-7rag_yg5d"><intent_id>1018997</intent_id><project_id>898336</project_id><text_data>Humphrey, Rd, Clinton, WA 98236      1. Air seal, belly blow  2. Single family     3. 1     4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No    5. Yes     6. Yes     7. No     8. No</text_data><comment_date>2019-10-31T00:00:00</comment_date></row><row _id="row-rrid.n3kj-rc76" _uuid="00000000-0000-0000-0563-6AC00EE5D700" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rrid.n3kj-rc76"><intent_id>502838</intent_id><project_id>649039</project_id><text_data>the contract amount is correct at $49,172,055.58</text_data><comment_date>2012-03-08T00:00:00</comment_date></row><row _id="row-f8cc.fgkw.ctej" _uuid="00000000-0000-0000-A2DC-D61D7A3FF31C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f8cc.fgkw.ctej"><intent_id>672998</intent_id><project_id>752295</project_id><text_data>Filed by Fred Paris</text_data><comment_date>2015-01-09T00:00:00</comment_date></row><row _id="row-ck3z.9cwu_pkzk" _uuid="00000000-0000-0000-0704-894252E6FCFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ck3z.9cwu_pkzk"><intent_id>964932</intent_id><project_id>846843</project_id><text_data>Supply and Install 40 mil smooth HDPE Liner</text_data><comment_date>2019-03-13T00:00:00</comment_date></row><row _id="row-rvdu~47hx~2e2h" _uuid="00000000-0000-0000-CCCA-C8CC369847F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rvdu~47hx~2e2h"><intent_id>1168689</intent_id><project_id>974877</project_id><text_data>9876929</text_data><comment_date>2021-08-12T00:00:00</comment_date></row><row _id="row-vaq5.aj57_gqtd" _uuid="00000000-0000-0000-DEC3-D85196EEECA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vaq5.aj57_gqtd"><intent_id>1318719</intent_id><project_id>1062778</project_id><text_data>Purchase Order # 2023003980</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-4qnd.fibu~t4eg" _uuid="00000000-0000-0000-DB88-543FE233926F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4qnd.fibu~t4eg"><intent_id>1251579</intent_id><project_id>1023197</project_id><text_data>-reason we have a carpenter tender is because the owner of K-A is doing the carpenter work, which is to put together and install park benches-construction enhancements to Veterans Park to install a Gold Star families memorial monument- site preparation, demolition, grading of grassed area. Hardscape seatwalls, existing paver resetting, new paver install, memorial monument footing/foundation. signage plaque install, installation of benches and granite plaques.</text_data><comment_date>2022-08-10T00:00:00</comment_date></row><row _id="row-5h27-if5w_kgi7" _uuid="00000000-0000-0000-E4D4-68610D45EA14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5h27-if5w_kgi7"><intent_id>573662</intent_id><project_id>699995</project_id><text_data>General labor work consists of the following: 1)  hand work only (shovel work) - no power equipment or power tools 2)  pilot car driver - used for mobilizing heavy equipment to and from the project site. Motor patrol grader (w/attachments) - used for grading the project site for compaction before paving operationsother trucks consist of a 0-8,000 gallon water truck used for watering the roadway for compaction and/or dust control (if needed).</text_data><comment_date>2013-06-06T00:00:00</comment_date></row><row _id="row-yrgf_998n-p8ws" _uuid="00000000-0000-0000-A3BE-F0EF196BF95A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yrgf_998n-p8ws"><intent_id>1091688</intent_id><project_id>924691</project_id><text_data>truck other is a non cdl flatbed truck to haul supplieslandscape labor is to plant grass</text_data><comment_date>2020-09-28T00:00:00</comment_date></row><row _id="row-y2fz-5pxq-nscb" _uuid="00000000-0000-0000-7E3B-BFB38F7873A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y2fz-5pxq-nscb"><intent_id>1039114</intent_id><project_id>898839</project_id><text_data>FILED BY MONICA WRIGHT</text_data><comment_date>2020-02-18T00:00:00</comment_date></row><row _id="row-jder-72cr~rphf" _uuid="00000000-0000-0000-274A-BD8E3FE84AEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jder-72cr~rphf"><intent_id>1037980</intent_id><project_id>904497</project_id><comment_date>2020-02-12T00:00:00</comment_date></row><row _id="row-2ds3_5wkn_6sdg" _uuid="00000000-0000-0000-086C-9C4845EF483E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ds3_5wkn_6sdg"><intent_id>780591</intent_id><project_id>797329</project_id><text_data>supplied play chips</text_data><comment_date>2016-08-08T00:00:00</comment_date></row><row _id="row-fmim_2ws8~4cjn" _uuid="00000000-0000-0000-B5A6-B4FF23AA239E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fmim_2ws8~4cjn"><intent_id>954666</intent_id><project_id>870538</project_id><text_data>1. Repairs to residential structures.2. Yes3. 14. A-No, B-No, C-Yes, D-No, E-No, F-No, G-No, H-No, I-No, J-No, K-No, I-No5. Yes6. YesItems to be repaired: Repair kitchen sink trap, replace kitchen faucet, replace bathroom faucet, replace toilet, replace angle stop at toilet, replace yard hydrant. Laborer to assist with material acquisition and assist owner with plumbing repairs.</text_data><comment_date>2019-01-11T00:00:00</comment_date></row><row _id="row-w5w2.kdne~mqd4" _uuid="00000000-0000-0000-F85D-B389F1102369" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w5w2.kdne~mqd4"><intent_id>948519</intent_id><project_id>861950</project_id><text_data>Electricians will be replacing an electrical panel at Spanaway Park. This is a commercial job.</text_data><comment_date>2018-11-30T00:00:00</comment_date></row><row _id="row-ppty.8dt4.yvgy" _uuid="00000000-0000-0000-5FD1-44DAF0D9E83A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ppty.8dt4.yvgy"><intent_id>685892</intent_id><project_id>752486</project_id><text_data>Street sweeping</text_data><comment_date>2015-03-26T00:00:00</comment_date></row><row _id="row-knee-vkfc-svaa" _uuid="00000000-0000-0000-1E3B-371EF223CEF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knee-vkfc-svaa"><intent_id>1054816</intent_id><project_id>917445</project_id><text_data>Contract Term: April 1, 2020 to March 31, 2020</text_data><comment_date>2020-04-29T00:00:00</comment_date></row><row _id="row-fkb6~en2u_2hw5" _uuid="00000000-0000-0000-C2C2-60B7ACB714BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fkb6~en2u_2hw5"><intent_id>460345</intent_id><project_id>667075</project_id><text_data>Other Trucks:  Water TrucksGeneral Laborers:  manual labor with small tools - rakes, shoves, hoes, related</text_data><comment_date>2011-06-24T00:00:00</comment_date></row><row _id="row-mx6r-9bzp.t4up" _uuid="00000000-0000-0000-321D-688C2A66591C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mx6r-9bzp.t4up"><intent_id>910683</intent_id><project_id>853159</project_id><text_data>Filed by Daniel Small</text_data><comment_date>2018-06-12T00:00:00</comment_date></row><row _id="row-9bdk.gkyp~wgi2" _uuid="00000000-0000-0000-1FC1-20A1F9062D07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9bdk.gkyp~wgi2"><intent_id>664285</intent_id><project_id>745311</project_id><text_data>Install Insulation, Single Family, 2 Story, No, No, Yes, No, No, No, No, No, No, No, No,Yes, Yes, No, No.</text_data><comment_date>2014-11-06T00:00:00</comment_date></row><row _id="row-pz26-ntfx_f4m6" _uuid="00000000-0000-0000-0F15-7EE1D901497F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pz26-ntfx_f4m6"><intent_id>567686</intent_id><project_id>709866</project_id><text_data>JW Wage 38.05, 9.50 Health &amp; Welfare, 8.46 Pension, .60 training, .20 Other</text_data><comment_date>2013-05-02T00:00:00</comment_date></row><row _id="row-p2h8.hqrd_3jm4" _uuid="00000000-0000-0000-F71B-845B134867A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p2h8.hqrd_3jm4"><intent_id>997269</intent_id><project_id>887078</project_id><text_data>We have workers comp insurance in Oregon with liberty mutual</text_data><comment_date>2019-08-06T00:00:00</comment_date></row><row _id="row-i9yr-s784_dcgv" _uuid="00000000-0000-0000-FAA4-6DBCD57F5D5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9yr-s784_dcgv"><intent_id>1122842</intent_id><project_id>921674</project_id><text_data>Final Clean First floor Vac Mop Dust wipe down all vertical and horizontal surfaces bucket water rags  6ft ladder</text_data><comment_date>2021-02-17T00:00:00</comment_date></row><row _id="row-vy63~ivh7.d94p" _uuid="00000000-0000-0000-6442-EBCA80682AFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vy63~ivh7.d94p"><intent_id>562080</intent_id><project_id>701934</project_id><text_data>PENSION - 5.50/HRHEALTH/WELFARE - 7.41/HRAPPRENTICESHIP - .69/HRSUBSTANCE ABUSE PROGRAM - .06/HRSTEP 1 APPRENTICE DOES NOT HAVE PENSION</text_data><comment_date>2013-03-28T00:00:00</comment_date></row><row _id="row-anxc_8kh7~w9f5" _uuid="00000000-0000-0000-5781-51455ACEF476" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-anxc_8kh7~w9f5"><intent_id>524356</intent_id><project_id>678472</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:   Traffic Control Stripers</text_data><comment_date>2012-07-25T00:00:00</comment_date></row><row _id="row-ejdd~i9jy_qdaw" _uuid="00000000-0000-0000-EC4D-6CF7AA2CB760" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ejdd~i9jy_qdaw"><intent_id>514417</intent_id><project_id>684534</project_id><text_data>MIRABEL REYNA 300194-5982802 BEAUDRY RD. #58YAKIMA, WA  98901</text_data><comment_date>2012-05-31T00:00:00</comment_date></row><row _id="row-w3hb-ibcj-veiy" _uuid="00000000-0000-0000-5A57-B9E80B97233C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w3hb-ibcj-veiy"><intent_id>1108631</intent_id><project_id>903726</project_id><text_data>Order A57588/A83069</text_data><comment_date>2020-12-09T00:00:00</comment_date></row><row _id="row-kvse.5cdz_pn3y" _uuid="00000000-0000-0000-04BD-78C411FC966D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvse.5cdz_pn3y"><intent_id>841524</intent_id><project_id>824769</project_id><text_data>Painting lockers at 6701 S. Park Ave. Tacoma, WA</text_data><comment_date>2017-06-19T00:00:00</comment_date></row><row _id="row-3jas-a2pt-ssg5" _uuid="00000000-0000-0000-6D6F-D90390C06F3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3jas-a2pt-ssg5"><intent_id>633687</intent_id><project_id>733330</project_id><text_data>Health &amp; Welfare $7.55Pension $8.40Training $0.70Total $16.65</text_data><comment_date>2014-06-09T00:00:00</comment_date></row><row _id="row-yczk-sn4w-ixvs" _uuid="00000000-0000-0000-C21C-2D37B53E7443" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yczk-sn4w-ixvs"><intent_id>932875</intent_id><project_id>855175</project_id><text_data>Filed by Lane Anderson</text_data><comment_date>2018-09-14T00:00:00</comment_date></row><row _id="row-r7nd.fiw6~bzgv" _uuid="00000000-0000-0000-C1F1-ACF16A82A379" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r7nd.fiw6~bzgv"><intent_id>1318514</intent_id><project_id>1037729</project_id><text_data>Our Worker's compensation insurance is through Idaho State Fund #557688</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-me79_5dn2-7xye" _uuid="00000000-0000-0000-FE43-D3C5794E4461" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-me79_5dn2-7xye"><intent_id>1180783</intent_id><project_id>968583</project_id><text_data>Owner Operator</text_data><comment_date>2021-09-26T00:00:00</comment_date></row><row _id="row-unhb~eaa7~edu8" _uuid="00000000-0000-0000-5158-3756780B7B1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-unhb~eaa7~edu8"><intent_id>485087</intent_id><project_id>672075</project_id><text_data>TRUCK DRIVER OTHER IS USED FOR TRUCK MOUNTED PICKUP SWEEPER</text_data><comment_date>2011-10-21T00:00:00</comment_date></row><row _id="row-ahv9_vks2~izs5" _uuid="00000000-0000-0000-18CA-47DC9D198ABA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ahv9_vks2~izs5"><intent_id>1109374</intent_id><project_id>943255</project_id><text_data>7023962</text_data><comment_date>2020-12-11T00:00:00</comment_date></row><row _id="row-vv7n-qf9z~y3wt" _uuid="00000000-0000-0000-B444-CFE8B3E125C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vv7n-qf9z~y3wt"><intent_id>1248985</intent_id><project_id>1016938</project_id><text_data>semi trucks hauling concrete girders</text_data><comment_date>2022-07-14T00:00:00</comment_date></row><row _id="row-pr9c.usat_6j87" _uuid="00000000-0000-0000-62A3-1187E1B93DA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pr9c.usat_6j87"><intent_id>505062</intent_id><project_id>684735</project_id><text_data>This form is being approved on the basis of your statement that your employees performed no tasks which required the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.    (chrr235)</text_data><comment_date>2012-04-05T00:00:00</comment_date></row><row _id="row-6ai6~ndfr-ykkq" _uuid="00000000-0000-0000-8491-D329F9175EEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ai6~ndfr-ykkq"><intent_id>499092</intent_id><project_id>682223</project_id><text_data>Contract Amount: $6,390.00Sales Tax:       $  504.81Total:           $6,894.81</text_data><comment_date>2012-02-03T00:00:00</comment_date></row><row _id="row-wfhu~gauv~5rm4" _uuid="00000000-0000-0000-BAD9-4BFD3DD96F38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wfhu~gauv~5rm4"><intent_id>524459</intent_id><project_id>686926</project_id><text_data>ANA MACIEL 300266-636103 N. ELLICE STREET #13MATTAWA, WA  99349</text_data><comment_date>2012-07-25T00:00:00</comment_date></row><row _id="row-8zmg~vfsa-39pv" _uuid="00000000-0000-0000-FD30-19C3A9D0AB00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zmg~vfsa-39pv"><intent_id>1090385</intent_id><project_id>932746</project_id><text_data>We are contracted to prime and double coat with paint apartment buildings, paint outside of exterior doors and metal railings and stain wood railings.The structures are apartment buildings The apartment buildings have 2 storiesa no (b no) (c no) (d no) (e no) (f no) (g no) (h no ) (i no) (J no) (k no) (l no)yesyesyesno</text_data><comment_date>2020-09-23T00:00:00</comment_date></row><row _id="row-ebbd~mdi5_pbmg" _uuid="00000000-0000-0000-99E2-01153459A602" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebbd~mdi5_pbmg"><intent_id>792805</intent_id><project_id>771162</project_id><text_data>Filed by Jeffery</text_data><comment_date>2016-09-29T00:00:00</comment_date></row><row _id="row-va8u~67nj-5qdf" _uuid="00000000-0000-0000-B067-B479354F4379" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-va8u~67nj-5qdf"><intent_id>599721</intent_id><project_id>722116</project_id><text_data>Clean up oil sheen on retention pond from oil spill from Metro Transit BusHazWaste Workers to clean contaminated area using shovels, rags and sorbents</text_data><comment_date>2013-10-16T00:00:00</comment_date></row><row _id="row-ffpi.r9d4-xzeb" _uuid="00000000-0000-0000-7489-F8EFC59FB892" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ffpi.r9d4-xzeb"><intent_id>971210</intent_id><project_id>878278</project_id><text_data>45th Ave S., Seattle, WA 981181. Air seal, attic blow, wall blow, and mechanical ventilation 			2. Single family			3. 1			4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No			5. Yes			6. Yes			7. No			8. No</text_data><comment_date>2019-04-12T00:00:00</comment_date></row><row _id="row-v8vr~xsbq-67y9" _uuid="00000000-0000-0000-C155-DF5AF60CA2EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8vr~xsbq-67y9"><intent_id>755533</intent_id><project_id>792666</project_id><text_data>Fringe = Medical $5.05 per Hr. 401K $12.22 per Hr.</text_data><comment_date>2016-04-14T00:00:00</comment_date></row><row _id="row-2q74.gvn5-wi6u" _uuid="00000000-0000-0000-E016-BDD1C5218112" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2q74.gvn5-wi6u"><intent_id>1007254</intent_id><project_id>893329</project_id><text_data>Estimate #20517</text_data><comment_date>2019-09-15T00:00:00</comment_date></row><row _id="row-3gds.5qd8~yx4t" _uuid="00000000-0000-0000-BE5E-AE8A503F65F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gds.5qd8~yx4t"><intent_id>1040809</intent_id><project_id>909545</project_id><text_data>Replacement of intent # 1033831 - Affidavit # 916099</text_data><comment_date>2020-02-25T00:00:00</comment_date></row><row _id="row-dyri~dzgg_t8xn" _uuid="00000000-0000-0000-875E-386C61B797A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dyri~dzgg_t8xn"><intent_id>795140</intent_id><project_id>804645</project_id><text_data>1) Install ductless heat pump system 2)single family dwelling 3)one story 4)residence a)no b)no c)yes d)no e)no f)no g)no h)no I)no j)no k)no 5)yes 6)yes 7)no 8)no</text_data><comment_date>2016-10-11T00:00:00</comment_date></row><row _id="row-9jd8_7jxi~3f8t" _uuid="00000000-0000-0000-D248-821D90EA0633" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9jd8_7jxi~3f8t"><intent_id>1318640</intent_id><project_id>1062728</project_id><text_data>9915893</text_data><comment_date>2023-04-11T00:00:00</comment_date></row><row _id="row-ar99_yvdv-g3b7" _uuid="00000000-0000-0000-ADAA-D641AB1AAD4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ar99_yvdv-g3b7"><intent_id>1440060</intent_id><project_id>1131535</project_id><text_data>Project# 05149, Branson, Darrel, 1706 N Park Rd, Spokane Valley, WA 99212</text_data><comment_date>2024-07-17T00:00:00</comment_date></row><row _id="row-3ipb.gi32-psjj" _uuid="00000000-0000-0000-539A-A454E764D166" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ipb.gi32-psjj"><intent_id>663771</intent_id><project_id>649039</project_id><text_data>A) SR99 Tunneling Project and its Repair Work Project.Alaskan way viaduct is going to be replaced by a tunnel which is about 2 miles beneath Seattle from the SoDo neighborhood to South Lake Union in the north. As the TBM need to be repaired to resume excavation, the Cutter Driving Unit have to be salvaged from the underground to repair at above ground. To do so, STP is currently excavating the access shaft. Once it will be completed, the cutter driving unit will be salvaged from the shaft by the gantry crane, the bearing and the seal ring will be replaced, and the fixing plate will be put on the TBM body. The Seal Ring and the Bearing Block were transported to T46 by the vessel from Japan and transported to the staging area close to the access shaft by the special transporter.B) We are the manufacturer of the TBM and supplier of the replacement parts. We also subcontract heavy lifting work, heavy parts hauling work, and gauging/welding work on the TBM for its repair work. We supervise those subcontractors. C) Our subcontractors, their duties, and required equipment are as follows;MammoetHauling of the seal ring and the bearing block came from Japan. Heavy lifting work for repair.Cranes: Crawler crane, Gantry craneSpecial transporter.National WeldingGauging out of the TBM Body and re-welding. As well as welding of fixing plates on the TBM Body. Welding equipmentGauging equipment</text_data><comment_date>2014-11-06T00:00:00</comment_date></row><row _id="row-ypej-mv8g_5gvx" _uuid="00000000-0000-0000-500E-993FACEC8A72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ypej-mv8g_5gvx"><intent_id>1144224</intent_id><project_id>946099</project_id><text_data>Per the generals intent notes:Construction of approximately 1600 linear feet of drainage improvements within the right-of-way of East Marginal Way, including but not limited to stormwater pump station installation, gravity and force main storm sewer, stormwater treatment vaults, cured in place pipe lining, bioretention planters, permeable pavement and paving, roadway, curb and gutter restoration, and other work necessary to complete the Work as specified and shown in the Contract Documents.Green City only to perform installation of plant material (~950 1 gallon and 2 gallon grasses and shrubs).  No warranty, no maintenance period.  Only installation of the plant material for the beautification of E Marginal Way right-of-way.  Installation only by hand tools such as picks, shovels, and rakes.  No heavy equipment or machinery shall be used onsite.</text_data><comment_date>2021-05-18T00:00:00</comment_date></row><row _id="row-wii2~n9z5~jnbq" _uuid="00000000-0000-0000-7F43-BF1642DC961C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wii2~n9z5~jnbq"><intent_id>951998</intent_id><project_id>869269</project_id><text_data>Install 2 new CAT6 cables from the nearest server location to the trainer&amp;#39;s room for voice and data to the trainers desk. Cables will be supported to comply with code every 4 to 5 feet. Cables will be labeled to LWSD standards and pass testing before complete. This work will be done inside, no outside work at this site.</text_data><comment_date>2018-12-21T00:00:00</comment_date></row><row _id="row-ir9h~xh52_ivuq" _uuid="00000000-0000-0000-A9FD-4BEC7556D643" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ir9h~xh52_ivuq"><intent_id>539485</intent_id><project_id>672068</project_id><text_data>Form filed by: Darrell Morgan, Owner</text_data><comment_date>2012-10-11T00:00:00</comment_date></row><row _id="row-w44m.w9tz.pkv7" _uuid="00000000-0000-0000-77C1-81AB160658D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w44m.w9tz.pkv7"><intent_id>1021683</intent_id><project_id>899486</project_id><text_data>Outdoor WorkElect tech(06)install low voltage cabling for CCTV cameras</text_data><comment_date>2019-11-14T00:00:00</comment_date></row><row _id="row-cwtx.htqf_xih8" _uuid="00000000-0000-0000-E9C9-283ADDBE195C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cwtx.htqf_xih8"><intent_id>595501</intent_id><project_id>719205</project_id><text_data>Owner Operated.</text_data><comment_date>2013-09-24T00:00:00</comment_date></row><row _id="row-ns95-pws3.kv8s" _uuid="00000000-0000-0000-3A4F-0EFBF3F68748" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ns95-pws3.kv8s"><intent_id>969898</intent_id><project_id>877709</project_id><text_data>PDXMAINT 01-01-19 THRU 12-31-19FORT VANCOUVER LIB</text_data><comment_date>2019-04-05T00:00:00</comment_date></row><row _id="row-j2en_b2pw-an8k" _uuid="00000000-0000-0000-34AA-BCD2BA0DAA57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j2en_b2pw-an8k"><intent_id>918741</intent_id><project_id>856145</project_id><text_data>18-20-8903</text_data><comment_date>2018-07-17T00:00:00</comment_date></row><row _id="row-zfp4-3qkt-et4q" _uuid="00000000-0000-0000-F09C-59669140D858" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zfp4-3qkt-et4q"><intent_id>628672</intent_id><project_id>734594</project_id><text_data>810992000</text_data><comment_date>2014-05-08T00:00:00</comment_date></row><row _id="row-pgbf.dmmt-j35g" _uuid="00000000-0000-0000-C32B-EFF62062A007" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pgbf.dmmt-j35g"><intent_id>830339</intent_id><project_id>819655</project_id><text_data>Basic-PSA, Inc workers will be inspecting, testing and repairing Basic-PSA, Inc Mechanical Shock Arrestors at the Columbia generating Station.  They will be using test machines that are used only to test Basic-PSA, Inc Mechanical Shock Arrestors. They will also be using special made hand tools to repair the Mechanical Shock Arrestors</text_data><comment_date>2017-05-05T00:00:00</comment_date></row><row _id="row-aku7_wjb4_xfy2" _uuid="00000000-0000-0000-A4F4-47422E8CC5C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aku7_wjb4_xfy2"><intent_id>945842</intent_id><project_id>866491</project_id><text_data>This Affidavit is for Service work for the year per request of Keely Nu&amp;#241;ez - Yakima County Facilities Services</text_data><comment_date>2018-11-14T00:00:00</comment_date></row><row _id="row-dqyj-5w8k-pmea" _uuid="00000000-0000-0000-A74A-C0C001D6CEC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dqyj-5w8k-pmea"><intent_id>1252141</intent_id><project_id>987371</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 6 for voice (telephone) and data (computer networking) indoors. POWERCOM JOB #421189</text_data><comment_date>2022-07-26T00:00:00</comment_date></row><row _id="row-gwcq-jqha.54xy" _uuid="00000000-0000-0000-11A1-61796D918FE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gwcq-jqha.54xy"><intent_id>716427</intent_id><project_id>759096</project_id><text_data>Filed by Eric Herrera</text_data><comment_date>2015-08-25T00:00:00</comment_date></row><row _id="row-eefh.j8wm-fpcq" _uuid="00000000-0000-0000-4EC6-4698E5788BED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eefh.j8wm-fpcq"><intent_id>814514</intent_id><project_id>801989</project_id><text_data>Filed by Kimm Butterfield</text_data><comment_date>2017-02-04T00:00:00</comment_date></row><row _id="row-dehq~7kqb.s2di" _uuid="00000000-0000-0000-BE39-724BD36FFAED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dehq~7kqb.s2di"><intent_id>552697</intent_id><project_id>701433</project_id><text_data>Install 21 category 6 cables, term, test and label. Install 713 wireless access points using existing cable.</text_data><comment_date>2013-02-27T00:00:00</comment_date></row><row _id="row-dgzt-f38t-mh66" _uuid="00000000-0000-0000-87D3-002751D8444A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgzt-f38t-mh66"><intent_id>1266224</intent_id><project_id>1030838</project_id><text_data>Job Number # 0422164</text_data><comment_date>2022-09-13T00:00:00</comment_date></row><row _id="row-6m4c~4nzg-bhjd" _uuid="00000000-0000-0000-0479-2FC7E438D95B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6m4c~4nzg-bhjd"><intent_id>939396</intent_id><project_id>828376</project_id><text_data>We are a Tribal Company and industrial insurance is not needed.</text_data><comment_date>2018-10-12T00:00:00</comment_date></row><row _id="row-3ee2~dqdk~vpb3" _uuid="00000000-0000-0000-943E-5A60889F1BB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ee2~dqdk~vpb3"><intent_id>501314</intent_id><project_id>654596</project_id><text_data>Form filed by: Richard Broten</text_data><comment_date>2012-02-22T00:00:00</comment_date></row><row _id="row-s52g_pcuc~2d48" _uuid="00000000-0000-0000-D00E-0201A8E09236" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s52g_pcuc~2d48"><intent_id>1177920</intent_id><project_id>979499</project_id><text_data>WO 236991 - CH-C-3 INTERFACE REPLACEMENT</text_data><comment_date>2021-09-15T00:00:00</comment_date></row><row _id="row-9cfc-ng7f.cgyk" _uuid="00000000-0000-0000-ACC5-AD41001AC2F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9cfc-ng7f.cgyk"><intent_id>1123533</intent_id><project_id>948541</project_id><text_data>Job # 35-100771</text_data><comment_date>2021-02-19T00:00:00</comment_date></row><row _id="row-h7ti~mrrh-2q3h" _uuid="00000000-0000-0000-AE46-7F4FECE8B5E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h7ti~mrrh-2q3h"><intent_id>584987</intent_id><project_id>716801</project_id><text_data>Form Filed By: Daniel Ren Martin</text_data><comment_date>2013-08-01T00:00:00</comment_date></row><row _id="row-it3e_ffxw.p29z" _uuid="00000000-0000-0000-63AB-EA97845BE2D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-it3e_ffxw.p29z"><intent_id>1096370</intent_id><project_id>934352</project_id><text_data>This is a Housing Act of 1937 project per 24 CFR 965.101 and is exempt from the state prevailing wage rates but not exempt from the application of other prevailing wage requirements under the Washington State laws, rules and policies</text_data><comment_date>2020-10-15T00:00:00</comment_date></row><row _id="row-jycm_hkps-gnbn" _uuid="00000000-0000-0000-A6EA-4C2185D16A85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jycm_hkps-gnbn"><intent_id>923185</intent_id><project_id>849916</project_id><text_data>We hired Speer Taps as a sub-tier contractor. HD Fowler did not perform any work at all.</text_data><comment_date>2018-08-03T00:00:00</comment_date></row><row _id="row-zvry~iu44.xtr5" _uuid="00000000-0000-0000-AB40-7B2809E615E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zvry~iu44.xtr5"><intent_id>1123327</intent_id><project_id>947567</project_id><text_data>MMCI#21-202</text_data><comment_date>2021-02-18T00:00:00</comment_date></row><row _id="row-5pva.q57r-2apb" _uuid="00000000-0000-0000-3214-26D3615F93E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5pva.q57r-2apb"><intent_id>1076969</intent_id><project_id>927602</project_id><text_data>Other Truck Driver is one that is MOB equipment and is paid at a higher wage per Union Contract.Truck Drivers - Fringe Benefit - $20.92 Health &amp; Security (does not include sick) $10.78, Pension - $9.44, Apprenticeship/Training - $0.70, Laborers - Fringe Benefit -  $12.64Health &amp; Security (does not include sick) $6.70, Pension - $4.79, Apprenticeship Training/Retraining - $0.95WCISAP - $0.06, NWLECET - $0.14Operators - Fringe Benefit - $22.47Health &amp; Security (does not include sick) $8.57, Pension - $13.15, Apprenticeship/Training - $0.70, National Apprenticeship - $0.05</text_data><comment_date>2020-08-07T00:00:00</comment_date></row><row _id="row-cacd.w99z.nbej" _uuid="00000000-0000-0000-E7A8-6C373DADB202" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cacd.w99z.nbej"><intent_id>1215735</intent_id><project_id>1002264</project_id><text_data>Invoice 909298-00 / Labor SRO 1914934</text_data><comment_date>2022-03-04T00:00:00</comment_date></row><row _id="row-293b-ht8g-wckn" _uuid="00000000-0000-0000-3DCF-94E4D007DBF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-293b-ht8g-wckn"><intent_id>710378</intent_id><project_id>765285</project_id><text_data>Salish Networks is a 100% Tulalip Tribes owned company located within the bounds of the Tulalip Reservation. The Tribe and all business entities are exempt from Washington State Workers Compensation Insurance Requirements. All employees are covered under Tribal First Insurance.Work will be conducted inside and will include Network cabling to support voice and data application for personal desktop computer systems, desk phones and associated devices.</text_data><comment_date>2015-07-28T00:00:00</comment_date></row><row _id="row-cvhs.bh3z.k3z7" _uuid="00000000-0000-0000-8580-4126956D6F58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cvhs.bh3z.k3z7"><intent_id>686745</intent_id><project_id>758952</project_id><text_data>Job # 9025059</text_data><comment_date>2015-04-01T00:00:00</comment_date></row><row _id="row-5rkw.63ed_bsh8" _uuid="00000000-0000-0000-7D7D-0D50CEAC414B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5rkw.63ed_bsh8"><intent_id>607198</intent_id><project_id>712187</project_id><text_data>trying to fix intent</text_data><comment_date>2014-02-21T00:00:00</comment_date></row><row _id="row-n4bh_yjqh.be2j" _uuid="00000000-0000-0000-700C-1A53D34AEC2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n4bh_yjqh.be2j"><intent_id>1336273</intent_id><project_id>1072951</project_id><text_data>THE CITY OF PACIFIC ACQUIRED 224 COUNTY LINE ROAD, A SINGLE FAMILY RESIDENTIAL HOME AND CONVERTED IT INTO A PUBLIC WORKS CREW OFFICE, GROUND EFFECTS LANDSCAPING WILL BE INSTALLATION IRRIGATION AND LANDSCAPING VEGETATION</text_data><comment_date>2023-06-14T00:00:00</comment_date></row><row _id="row-rwuf~juj5~rs45" _uuid="00000000-0000-0000-7B90-977D7400A27D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rwuf~juj5~rs45"><intent_id>1336128</intent_id><project_id>1004012</project_id><comment_date>2023-06-14T00:00:00</comment_date></row><row _id="row-rev3~58yi_bbyv" _uuid="00000000-0000-0000-CA43-AA817AEF264C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rev3~58yi_bbyv"><intent_id>933052</intent_id><project_id>861500</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2018-09-20T00:00:00</comment_date></row><row _id="row-pyw9~jzvv_cst3" _uuid="00000000-0000-0000-685A-1BD21CF05351" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pyw9~jzvv_cst3"><intent_id>1192701</intent_id><project_id>966407</project_id><text_data>Average wage and fringe</text_data><comment_date>2021-11-11T00:00:00</comment_date></row><row _id="row-tzn9~22eq-gz8q" _uuid="00000000-0000-0000-F2C8-90799BD5B20A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzn9~22eq-gz8q"><intent_id>951733</intent_id><project_id>867944</project_id><text_data>Work performed by the Telecommunication Technicians is installing Category 6 cabling for voice and data indoors/outdoors. 2025 NE TERRE VIEW DR PULLMAN, WA 99163</text_data><comment_date>2018-12-20T00:00:00</comment_date></row><row _id="row-qvrb~sd7i-2jyw" _uuid="00000000-0000-0000-EB90-E85B21125C0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qvrb~sd7i-2jyw"><intent_id>535693</intent_id><project_id>691945</project_id><text_data>Please do not reply directly to this email. Please respond to SuAnne Pettit at PETU235@LNI.WA.GOV with your answers. You have until the close of business on Friday, September 21, 2012, to respond to this email or your form, along with the correction(s) needed, will be mailed back to you 1) Please list your Industrial Insurance account number. If you do not have an Industrial Insurance account then you will need to contact Industrial Insurance at 360-902-4817. Once you have set up your Industrial Insurance account you may resubmit your form. ************ 2) Please provide the Prime Contractor's Registration Number. ************ 3) Please provide the bid due date. This date should match the date listed on your Prime Contractor�s form. ************ 4) Please provide the Hiring Contractor�s company name, contractor registration and UBI number. This is the company that hired your company to perform work on this project. Please let me know if you have any questions. Thank you, SuAnne Pettit</text_data><comment_date>2012-09-20T00:00:00</comment_date></row><row _id="row-rtp4-eg6g.9rp4" _uuid="00000000-0000-0000-3183-321C1CAFBA6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rtp4-eg6g.9rp4"><intent_id>1112138</intent_id><project_id>944811</project_id><text_data>Wages have been paid with intent to pay prevailing wage.</text_data><comment_date>2020-12-28T00:00:00</comment_date></row><row _id="row-55e3-fd8w-e2vy" _uuid="00000000-0000-0000-EF8C-9207A5B28290" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-55e3-fd8w-e2vy"><intent_id>564627</intent_id><project_id>708842</project_id><text_data>Installation of sediment collection areas, filter fabric and check dams (all digging to be done by hand and all removed soil to be re-used on-site) using shovels, picks, hand tools, buckets, wheelbarrows. Transportation and installation of plants and mulch to use shovels, hand tools, buckets, wheelbarrows and Ford F550 truck.</text_data><comment_date>2013-04-15T00:00:00</comment_date></row><row _id="row-8w5f-6r8n_2mqa" _uuid="00000000-0000-0000-C061-73468E468802" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8w5f-6r8n_2mqa"><intent_id>453209</intent_id><project_id>613414</project_id><text_data>This is for the Woodmont Library</text_data><comment_date>2011-04-27T00:00:00</comment_date></row><row _id="row-whvj-3ysv-wqg6" _uuid="00000000-0000-0000-710E-8D90AC0AE8E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-whvj-3ysv-wqg6"><intent_id>970407</intent_id><project_id>877924</project_id><text_data>5050.180214-219</text_data><comment_date>2019-04-09T00:00:00</comment_date></row><row _id="row-rwwn~a77p~k73g" _uuid="00000000-0000-0000-7A17-FAD809841493" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rwwn~a77p~k73g"><intent_id>799409</intent_id><project_id>806351</project_id><text_data>COV JOC Project.</text_data><comment_date>2016-11-02T00:00:00</comment_date></row><row _id="row-w6tq~bpw3~y2ms" _uuid="00000000-0000-0000-CE64-7149B77B2F8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w6tq~bpw3~y2ms"><intent_id>697593</intent_id><project_id>754160</project_id><text_data>INSTALLATION OF TREES SHRUBS AND GROUNDCOVER. PLACING 4&amp;quot; TOPSOIL, 3&amp;quot; COMPOST , AND 2&amp;quot;BARK MULCH , INSTALLATION OF IRRIGATION SYSTEM ALL TO BE PLACED AROUND NEW RADIO BUILDING.</text_data><comment_date>2015-06-01T00:00:00</comment_date></row><row _id="row-m3tu~inrv.gi93" _uuid="00000000-0000-0000-F93A-BA2F40B4ACE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m3tu~inrv.gi93"><intent_id>815736</intent_id><project_id>812829</project_id><text_data>A - Classroom addition on existing East Valley Central Middle SchoolB - Electrical Installation, phone/data, fire alarm, classroom audio/visual, CCTV system, Access ControlC - Installing PVC pipe in open ditch. No tools or equipment used.</text_data><comment_date>2017-02-21T00:00:00</comment_date></row><row _id="row-z5m7-dyjr-8uen" _uuid="00000000-0000-0000-94BC-FF9F7CF70C62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z5m7-dyjr-8uen"><intent_id>574517</intent_id><project_id>712992</project_id><text_data>Filed by Sharon Wendling.</text_data><comment_date>2013-06-11T00:00:00</comment_date></row><row _id="row-9vuh_m6hz.v694" _uuid="00000000-0000-0000-2817-F42C8EA27B2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9vuh_m6hz.v694"><intent_id>870370</intent_id><project_id>835618</project_id><text_data>1) Fix leak in crawl. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f) No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) Yes - manager office. 8) No.</text_data><comment_date>2017-10-20T00:00:00</comment_date></row><row _id="row-5rvh-vg97-g95m" _uuid="00000000-0000-0000-A744-6C4B380BDF69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5rvh-vg97-g95m"><intent_id>633569</intent_id><project_id>736472</project_id><text_data>other truck= lowboy over 50 tons</text_data><comment_date>2014-06-06T00:00:00</comment_date></row><row _id="row-5q87_ay2b~gud2" _uuid="00000000-0000-0000-1D49-D2B551A63C91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5q87_ay2b~gud2"><intent_id>534424</intent_id><project_id>695404</project_id><text_data>Blower truck application of playchips thru a 4&amp;quot; hoses, going to multiple schools</text_data><comment_date>2012-09-14T00:00:00</comment_date></row><row _id="row-fcqx.tx7a-ygva" _uuid="00000000-0000-0000-A773-0C43C83DA314" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fcqx.tx7a-ygva"><intent_id>1445032</intent_id><project_id>1134144</project_id><text_data>On call time and materials</text_data><comment_date>2024-07-10T00:00:00</comment_date></row><row _id="row-4evq_gkpx~ebsg" _uuid="00000000-0000-0000-2A77-59BB1A1DA817" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4evq_gkpx~ebsg"><intent_id>694189</intent_id><project_id>762116</project_id><text_data>Form filed by:  Kevin Messick</text_data><comment_date>2015-05-13T00:00:00</comment_date></row><row _id="row-t4g3.ezu8_ns2f" _uuid="00000000-0000-0000-DD24-11066D026C48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t4g3.ezu8_ns2f"><intent_id>753883</intent_id><project_id>786214</project_id><text_data>#1 repair wiring   #2 apartment  #3 3  #4a no b no c no d no e no f no g no h no I no j no #5 yes #6 yes #7 yes #8 no</text_data><comment_date>2016-04-04T00:00:00</comment_date></row><row _id="row-885i~qf5c-2j3n" _uuid="00000000-0000-0000-B90C-2021CB52C144" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-885i~qf5c-2j3n"><intent_id>497351</intent_id><project_id>681552</project_id><text_data>: #1 - Is the structure a single family dwelling single family dwelling, duplex, apartment, condominium or other residential structure? #2 - Including any basement (13 basements )or garage (17 garages), how many stories or levels does the structure have? One level Ranch #3 - What is the facility used for? --Answer �yes� or �no� to each of the following options: (a) Permanent residence only? YES (b) Rehabilitation house? NO (c) Transitional housing? NO (d) Communal dining facility? NO (e) Treatment services? NO (f) Counseling? NO (g) Other? #4 - Does each dwelling unit have its own self-contained kitchen? YES #5 - Does each dwelling unit have its own bathroom? YES #6 - Is there a community facility or manager�s office on site? YES #7 - Is any part of the facility used by members of the public? NO</text_data><comment_date>2012-01-25T00:00:00</comment_date></row><row _id="row-4gze_ktzw-6g4i" _uuid="00000000-0000-0000-833D-DECD67669E62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4gze_ktzw-6g4i"><intent_id>694288</intent_id><project_id>762159</project_id><text_data>#1  Installing floor coverings in the residence on the hatchery property#2 Yes#3 2#4 (a)no(b)no(c)yes(d)no(e)no(f)no(g)no(h)no(i)no(j)no(k)no#5 yes#6 yes#7 no#8 no</text_data><comment_date>2015-05-13T00:00:00</comment_date></row><row _id="row-eb4y.irwt.9ixm" _uuid="00000000-0000-0000-2BA5-00BFBB523D44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eb4y.irwt.9ixm"><intent_id>495615</intent_id><project_id>680818</project_id><text_data>The scope of work for this project is to provide and install voie and data cable.</text_data><comment_date>2012-01-04T00:00:00</comment_date></row><row _id="row-snsf-wuqs.kusi" _uuid="00000000-0000-0000-E310-4F4B16AC3987" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-snsf-wuqs.kusi"><intent_id>881018</intent_id><project_id>840319</project_id><text_data>Fence installation. Boulder installation and delivery. Irrigation installation. Concrete curbing, Sod installation. Planting. debris removal</text_data><comment_date>2017-12-28T00:00:00</comment_date></row><row _id="row-mye2.9fg7~rmpd" _uuid="00000000-0000-0000-E4C9-62BAA32D46C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mye2.9fg7~rmpd"><intent_id>1080498</intent_id><project_id>929180</project_id><text_data>This SOI is for services at the UW.  They are 'piggybacking' off the City of Seattle B contract, most recent renewal date 4/1/2020.</text_data><comment_date>2020-08-14T00:00:00</comment_date></row><row _id="row-7y8z-z7pq-3cnn" _uuid="00000000-0000-0000-A36B-7DC3D2561910" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7y8z-z7pq-3cnn"><intent_id>1273777</intent_id><project_id>1034864</project_id><text_data>BCI Project No. SJ9049Filed by Kathi Clark</text_data><comment_date>2022-10-11T00:00:00</comment_date></row><row _id="row-epwt_jmbr-2mwm" _uuid="00000000-0000-0000-AC5A-EE0C252460A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-epwt_jmbr-2mwm"><intent_id>838904</intent_id><project_id>823735</project_id><text_data>The asbestos abatement company, IRS Environmental will be doing the flooring abatement.  T&amp;M Restoration&amp;#39;s general laborers will be transferring packed boxes from the classrooms to the storage units to include the furniture.</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-d5xy-bavn-di98" _uuid="00000000-0000-0000-6FF3-FCE62CA87CF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d5xy-bavn-di98"><intent_id>909437</intent_id><project_id>851159</project_id><text_data>union contractor benefits 27.367.52 medical.94 apprentice training programs17.00 pensions1.90 PTO</text_data><comment_date>2018-06-06T00:00:00</comment_date></row><row _id="row-tai2-u92s_7gw4" _uuid="00000000-0000-0000-CA57-25C8FF072018" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tai2-u92s_7gw4"><intent_id>556095</intent_id><project_id>701623</project_id><text_data>Form filed by: Elba Hernandez</text_data><comment_date>2013-02-13T00:00:00</comment_date></row><row _id="row-cvw4_i6bb-wdup" _uuid="00000000-0000-0000-2569-7EF075CD19BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cvw4_i6bb-wdup"><intent_id>1114293</intent_id><project_id>907022</project_id><text_data>MMFS Job#77180218/refile intent with new contractor #</text_data><comment_date>2021-01-11T00:00:00</comment_date></row><row _id="row-bpgz_zaku-ddcw" _uuid="00000000-0000-0000-C789-7400F2ACC0C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bpgz_zaku-ddcw"><intent_id>1267538</intent_id><project_id>880160</project_id><text_data>PROVIDE AND INSTALL CAMERAS FOR ALARM TROUBLESHOOTING. UPDATE SECURITY CAMERAS IN HILLCREAST SCHOOLS.</text_data><comment_date>2022-09-19T00:00:00</comment_date></row><row _id="row-esv7-g854_p3t9" _uuid="00000000-0000-0000-6B92-08CA438EB2BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-esv7-g854_p3t9"><intent_id>1265859</intent_id><project_id>1030603</project_id><text_data>9896890</text_data><comment_date>2022-09-12T00:00:00</comment_date></row><row _id="row-3smv.33nb-83j4" _uuid="00000000-0000-0000-17AE-526F8C13F375" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3smv.33nb-83j4"><intent_id>716730</intent_id><project_id>758006</project_id><text_data>Filed by Michael HummelState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- Issaquah Middle SchoolPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?New construction of middle school.2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.) Does this project entail the remodeling or new construction of a facility?Yes, but not performed by Siemens Employees.4.) If your firm is working upon a type of building system, what type of system is involved? HVAC/refrigeration control system.5.) What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.) Are you going to be hiring any subcontractors for this project?Yes.To expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2015-08-26T00:00:00</comment_date></row><row _id="row-hy57_4dzm~t37q" _uuid="00000000-0000-0000-19DA-650C3EFC673E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hy57_4dzm~t37q"><intent_id>1069483</intent_id><project_id>903244</project_id><text_data>Source Electric LLC pays fringe benefits to IBEW Local 46 Trust Office.  The hourly fringe benefits are: Health &amp; Welfare 9.70/hr, Pension 9.68/hr, 401K 2.00/hr, JATC 0.68/hr, &amp; NEBF 1.73/hr.</text_data><comment_date>2020-07-01T00:00:00</comment_date></row><row _id="row-2zjk.ccia_e66j" _uuid="00000000-0000-0000-98B3-923E92BA225B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2zjk.ccia_e66j"><intent_id>909986</intent_id><project_id>852902</project_id><text_data>Sample and remove fluids from areaHaz Waste workers to sample fluids using jars and small hand held shovels then clean area using shovels/rags</text_data><comment_date>2018-06-08T00:00:00</comment_date></row><row _id="row-j23z_mp6d-ip8r" _uuid="00000000-0000-0000-F71A-AB379B3BB411" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j23z_mp6d-ip8r"><intent_id>564210</intent_id><project_id>706245</project_id><text_data>Hydroseeding/Hydromuching with truck mounted hydroseeder.</text_data><comment_date>2013-04-11T00:00:00</comment_date></row><row _id="row-6cci-wa4s-jjph" _uuid="00000000-0000-0000-EB1A-9DA8976FEFC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6cci-wa4s-jjph"><intent_id>531242</intent_id><project_id>694795</project_id><text_data>Filed by Frank Jones</text_data><comment_date>2012-08-28T00:00:00</comment_date></row><row _id="row-u2k3_g3dh-7wsh" _uuid="00000000-0000-0000-96B7-020A6E946D67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u2k3_g3dh-7wsh"><intent_id>1268040</intent_id><project_id>1031801</project_id><text_data>Truck Dimensions: 40ft x 8.5ft x 13ft (LxWxH)Truck Weight: 60,000lbsTruck Type: Sterling Truck Purpose: Geotechnical Testing/Drilling</text_data><comment_date>2022-10-28T00:00:00</comment_date></row><row _id="row-7rff_48sd~29aq" _uuid="00000000-0000-0000-6BA3-8721FBCC49A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7rff_48sd~29aq"><intent_id>760003</intent_id><project_id>791076</project_id><text_data>Filed by Joe Favre.</text_data><comment_date>2016-05-03T00:00:00</comment_date></row><row _id="row-q76b_hjb2_m4xf" _uuid="00000000-0000-0000-63D1-66C0F6459D09" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q76b_hjb2_m4xf"><intent_id>907317</intent_id><project_id>851844</project_id><text_data>We will be doing raking, hand digging, setting planter boxes, seeding</text_data><comment_date>2018-05-29T00:00:00</comment_date></row><row _id="row-7i2m.27xd.3gus" _uuid="00000000-0000-0000-4A9A-DC13E2FCE740" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7i2m.27xd.3gus"><intent_id>1057606</intent_id><project_id>845033</project_id><text_data>Modifying previous note to add Kittitas (Ellensburg) as potential locations where work could be performed away from the project site but still in Washington State.</text_data><comment_date>2020-06-08T00:00:00</comment_date></row><row _id="row-xptu~sdzm.hfzi" _uuid="00000000-0000-0000-8ED4-A697E0753FF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xptu~sdzm.hfzi"><intent_id>1027506</intent_id><project_id>902343</project_id><text_data>Prime Job # 1004452</text_data><comment_date>2019-12-17T00:00:00</comment_date></row><row _id="row-fjd9.wsdt-pzd6" _uuid="00000000-0000-0000-B112-973533FAF817" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fjd9.wsdt-pzd6"><intent_id>1035484</intent_id><project_id>906722</project_id><text_data>INSTALL NETWORK CABLE IN N276 ON NORTH WALL.</text_data><comment_date>2020-02-03T00:00:00</comment_date></row><row _id="row-bqbe.f2nv~j38b" _uuid="00000000-0000-0000-0F2E-65B7851830CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bqbe.f2nv~j38b"><intent_id>739007</intent_id><project_id>781436</project_id><text_data>Filed by Leah Brockmoller</text_data><comment_date>2015-12-23T00:00:00</comment_date></row><row _id="row-wsbc_f8qu~mvnz" _uuid="00000000-0000-0000-0F4D-731CAB069032" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wsbc_f8qu~mvnz"><intent_id>786424</intent_id><project_id>800039</project_id><text_data>ID Company using ID employees and ID State Insurance Fund # 643273 Workers Comp</text_data><comment_date>2016-08-31T00:00:00</comment_date></row><row _id="row-q394.ztip_tprp" _uuid="00000000-0000-0000-E726-CB8EFD7DD1EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q394.ztip_tprp"><intent_id>955660</intent_id><project_id>867889</project_id><text_data>Richard Smith is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing wood skirting around the home. This job meets the residential job requirements.</text_data><comment_date>2019-01-17T00:00:00</comment_date></row><row _id="row-fhjm-25np_jnic" _uuid="00000000-0000-0000-90D1-04AB578FB68F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fhjm-25np_jnic"><intent_id>751438</intent_id><project_id>787245</project_id><text_data>Repair fiber cabling to support the telecommunications system which includes telephone (voice over distance) and data (bits and bytes) service. This work will be performed indoors.</text_data><comment_date>2016-03-15T00:00:00</comment_date></row><row _id="row-dd7u_8d6e-tebq" _uuid="00000000-0000-0000-C6D8-C05E752DB532" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dd7u_8d6e-tebq"><intent_id>1116457</intent_id><project_id>947290</project_id><text_data>Specific tasks:  maintenance brush control using the application of herbicides directly to competing invasive plants, using a hand held wand attached to a small backpack tank, under the direct supervision of a licensed applicator.maintenance brush control, using weed trimmers and/or walk behind mowers</text_data><comment_date>2021-01-20T00:00:00</comment_date></row><row _id="row-55bp~xrf5-ubtm" _uuid="00000000-0000-0000-B81A-A48FD9640053" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-55bp~xrf5-ubtm"><intent_id>511844</intent_id><project_id>681789</project_id><text_data>This project to consist of right of way restoration in the neighborhood of Laurelhurst in the city of Seattle. Project includes 6&amp;quot; new soil, sod, salvaging and replacing of existing plant material, salvaging and replacing existing pavers. Tools to be used inlcude shovels, rakes, buckets, wheelbarrels, brooms, and blowers for cleanup. Project is set on a Mon-Thurs scheduled beginning week of May 21, 2012 and should last about 30 days.</text_data><comment_date>2012-05-14T00:00:00</comment_date></row><row _id="row-7wtq-u876~yvc2" _uuid="00000000-0000-0000-702E-BE33FA06686D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7wtq-u876~yvc2"><intent_id>1232405</intent_id><project_id>938045</project_id><text_data>We are a Tribal Owned Entity whose private insurance meets and/or exceeds LNI's Workers Comp.</text_data><comment_date>2022-05-10T00:00:00</comment_date></row><row _id="row-q4tm.n42p-svs5" _uuid="00000000-0000-0000-CE2B-3F805A1514BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q4tm.n42p-svs5"><intent_id>852153</intent_id><project_id>825400</project_id><text_data>We do not know the entire scope of this project as we are only performing the erosion control portion. Our laborers use hand tools like picks, shovels, and post pounders to install temporary erosion and sediment control products.</text_data><comment_date>2017-08-02T00:00:00</comment_date></row><row _id="row-q9kx.3rwi-j222" _uuid="00000000-0000-0000-C039-AB0252299B6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9kx.3rwi-j222"><intent_id>485906</intent_id><project_id>675677</project_id><text_data>Fringe Breakdown:  $5.00 medical, $1.00 vacation, $1.00 Holiday, remainder goes towards pension</text_data><comment_date>2011-10-26T00:00:00</comment_date></row><row _id="row-gsyh~ius5~ybfw" _uuid="00000000-0000-0000-6029-84DE9A737FB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gsyh~ius5~ybfw"><intent_id>1184459</intent_id><project_id>979692</project_id><text_data>VE 16716</text_data><comment_date>2021-10-11T00:00:00</comment_date></row><row _id="row-7snd.eqcn.ugcf" _uuid="00000000-0000-0000-BA25-E8F1AE6D513B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7snd.eqcn.ugcf"><intent_id>591811</intent_id><project_id>719260</project_id><text_data>Filed by Pam King</text_data><comment_date>2013-09-05T00:00:00</comment_date></row><row _id="row-gm5d~3y7h.2ebj" _uuid="00000000-0000-0000-CC08-45097DD8F5B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gm5d~3y7h.2ebj"><intent_id>976247</intent_id><project_id>878202</project_id><text_data>Other Trucks - 2,000 Gallon Water Truck for dust control on site</text_data><comment_date>2019-05-07T00:00:00</comment_date></row><row _id="row-d3r9~7ink~y4nd" _uuid="00000000-0000-0000-3D9B-CC888654DDA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d3r9~7ink~y4nd"><intent_id>756258</intent_id><project_id>755850</project_id><text_data>We will be seeding Native grasses and using erosion control mulch. Hydroseeding (or hydraulic mulch seeding, hydro-mulching, hydraseeding) is a planting process that uses a slurry of seed and mulch. It is often used as an erosion control technique on construction sites, as an alternative to the traditional process of broadcasting or sowing dry seed.Employee will be driving the truck and operating the Hydro-Mulcher.</text_data><comment_date>2016-04-12T00:00:00</comment_date></row><row _id="row-5qpa~g38z.is9a" _uuid="00000000-0000-0000-AFC5-40B0EA8A7304" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5qpa~g38z.is9a"><intent_id>475781</intent_id><project_id>673575</project_id><text_data>GENERAL LABORERS USE HAND TOOLS SUCH AS SHOVELS AND RAKE AND DO MANUAL TASKS SUCH AS INSTALLING SILT FENCE AND HAY. OTHER TRUCKS INCLUDE LOWBOY AND/OR WATERTRUCKS.other truck is lowboy</text_data><comment_date>2011-09-01T00:00:00</comment_date></row><row _id="row-wh8i_vfmw.v8qa" _uuid="00000000-0000-0000-E717-9754E6BDA5BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wh8i_vfmw.v8qa"><intent_id>924397</intent_id><project_id>858262</project_id><text_data>ALLIED&amp;#39;S JOB # 180725-0005.219</text_data><comment_date>2018-08-09T00:00:00</comment_date></row><row _id="row-ftt7~kvh4~s4ui" _uuid="00000000-0000-0000-81C2-77B2F6AAF49E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ftt7~kvh4~s4ui"><intent_id>1016629</intent_id><project_id>896675</project_id><text_data>We will be using subcontractors for all work, except possible punch-list items and possible site clean-up.</text_data><comment_date>2019-10-21T00:00:00</comment_date></row><row _id="row-enqb~p3tv-cpyf" _uuid="00000000-0000-0000-7C65-229D97BD44D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-enqb~p3tv-cpyf"><intent_id>1138020</intent_id><project_id>958682</project_id><text_data>GU Job #21101Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2021-04-22T00:00:00</comment_date></row><row _id="row-vnrc.c66w.ijfd" _uuid="00000000-0000-0000-439F-0822B2DD0021" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vnrc.c66w.ijfd"><intent_id>598079</intent_id><project_id>721516</project_id><text_data>DELIA ESTRADA1900 BROADWAY ST #55HOQUIAM WA 98550</text_data><comment_date>2013-10-07T00:00:00</comment_date></row><row _id="row-hbsu_redf_9ivr" _uuid="00000000-0000-0000-73D0-DBC2141D04D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hbsu_redf_9ivr"><intent_id>1166390</intent_id><project_id>973727</project_id><text_data>Other truck is a 3000 gallon water truck</text_data><comment_date>2021-08-04T00:00:00</comment_date></row><row _id="row-wxzc-vd7b~ev3r" _uuid="00000000-0000-0000-A9DB-412CEE297789" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wxzc-vd7b~ev3r"><intent_id>617684</intent_id><project_id>729771</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.   HVAC replacement.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?   Single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? SFR(a) Any commercial use in the structure? no(b) (b) Any retail use in the structure? no(c) (c) Permanent residence only? yes(d) (d) Rehabilitation house? no(e)  (e) Transitional housing? no(f) (f) Communal dining facility? no(g)  (g) Treatment services? no(h) (h) Dormitories? no(i) (i) Counseling? no(j) (j) Is each room and/or bed in the structure rented separately? N/a(k) (k) Other? no#5 - Does each dwelling unit have its own self-contained kitchen? N/a#6 - Does each dwelling unit have its own bathroom?  N/a#7 - Is there a community facility or manager�s office on site? no#8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2014-02-25T00:00:00</comment_date></row><row _id="row-sfz4-qadh.6jky" _uuid="00000000-0000-0000-3621-A5A8852A3717" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sfz4-qadh.6jky"><intent_id>654556</intent_id><project_id>740281</project_id><text_data>Install indoor telephone wiring at the Riverpointe Campus Academic Center</text_data><comment_date>2014-09-15T00:00:00</comment_date></row><row _id="row-y53k~b6hz~qb6r" _uuid="00000000-0000-0000-C2CC-25B3243B0834" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y53k~b6hz~qb6r"><intent_id>711166</intent_id><project_id>764838</project_id><text_data>Electrofisher requires extensive training</text_data><comment_date>2015-07-30T00:00:00</comment_date></row><row _id="row-bkxn.wtuj~6agd" _uuid="00000000-0000-0000-60BD-50EFB280880B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bkxn.wtuj~6agd"><intent_id>648739</intent_id><project_id>741764</project_id><text_data>We will be covering signs and installing construction class a signs.  Basic power tools and a post hole digger, shovel. KT will use a pickup truck.  This is a bridge painting project there will be scaffolding, sandblasting, old paint removal and painting of the bridge.</text_data><comment_date>2014-08-20T00:00:00</comment_date></row><row _id="row-wggr_puiu.ctr9" _uuid="00000000-0000-0000-3FD6-5348F8B8BA35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wggr_puiu.ctr9"><intent_id>1465774</intent_id><project_id>1128180</project_id><text_data>deliver and set up 12x56 mobile office via toter style truck    RO 034926</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-nweq~rvxy_xtvj" _uuid="00000000-0000-0000-F161-C404EA01E2CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nweq~rvxy_xtvj"><intent_id>1469270</intent_id><project_id>1146414</project_id><text_data>9953886</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-u5j8_2wis-kf65" _uuid="00000000-0000-0000-CF6E-251B11025358" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u5j8_2wis-kf65"><intent_id>1458749</intent_id><project_id>1140982</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement:On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12).L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates. The use of on-call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2024-08-30T00:00:00</comment_date></row><row _id="row-eh26~aq8n.mab3" _uuid="00000000-0000-0000-B030-5FD1D29F7D8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eh26~aq8n.mab3"><intent_id>1463555</intent_id><project_id>1138070</project_id><text_data>the project was to remove and replace a dishwasher. Our part was to remove and replace the dishwasher. the laborer assisted with lifting and moving a shelf and dish table to gain the room to move the dishwasher. he then assisted with the moving og the dishwasher. he assisted with the reinstallation of the shelf and dish table. He used screw drivers, jack, level.</text_data><comment_date>2024-09-18T00:00:00</comment_date></row><row _id="row-6mah~t4re.uccu" _uuid="00000000-0000-0000-B089-4458846453E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6mah~t4re.uccu"><intent_id>1469208</intent_id><project_id>1146383</project_id><text_data>238100</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-8rr2.t7j8-w9er" _uuid="00000000-0000-0000-FEB4-D58BABF1E03E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8rr2.t7j8-w9er"><intent_id>1469476</intent_id><project_id>1146526</project_id><text_data>9953863</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-9i8n-w8mr.5sp8" _uuid="00000000-0000-0000-BBF0-D26765F071CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9i8n-w8mr.5sp8"><intent_id>1469333</intent_id><project_id>1146445</project_id><text_data>9949799</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-2qii-cq99~d62w" _uuid="00000000-0000-0000-E6BF-E76AB7CC38DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2qii-cq99~d62w"><intent_id>1469190</intent_id><project_id>1146372</project_id><text_data>MMFS - 73246949</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-imgb-yazq-uhvh" _uuid="00000000-0000-0000-1027-05439787B34C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imgb-yazq-uhvh"><intent_id>1465678</intent_id><project_id>1135297</project_id><text_data>- All work will be done indoors - Telecommunication wi-fi Cabling</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-bcub.cpgb_nins" _uuid="00000000-0000-0000-175C-7B736530273B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bcub.cpgb_nins"><intent_id>1469385</intent_id><project_id>1146479</project_id><text_data>DWS PVW Ref # WA-866</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-9a9s~cru8-8ppv" _uuid="00000000-0000-0000-94CC-FDD4152884D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9a9s~cru8-8ppv"><intent_id>1469256</intent_id><project_id>1144627</project_id><text_data>OUR JOB #2010-22-4829</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-qttf.hsc7.d8h6" _uuid="00000000-0000-0000-B049-0953E1CF2289" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qttf.hsc7.d8h6"><intent_id>1137928</intent_id><project_id>931553</project_id><text_data>Statement of Intent to Pay Prevailing Wage Project:                    OH &amp; UG Line Work: SE 1st &amp; 164th Ave.Contract No.             B602 Subcontractor:         Columbia West Engineering, Inc.                                   11917 NE 95th St                                   Vancouver, Washington 98682                                   UBI# 602-081-160Intent ID #                 1085631 Prime Contractor:    Magnum Power LLC 1.   What is the specific purpose of this awarding agency�s public works project? Columbia West Engineering will provide on-call testing and inspection services for utility trenching  2. Does this project include the fabrication, delivery, or installation of non-standard        item(s) fabricated according to specifications specifically for a public works project? No fabrication, delivery, or installation of non-standard items.  3.  Does this specific project entail the remodeling or new construction of a facility? No remodeling or new construction of a facility. 4.  If your firm is working upon a type of building system, what type of system is                          Involved? No building system work. 5.  What specific tasks will your employees perform? Testing and observation of construction materials. 6.  What, if any, tools will your employees use in the performance of those tasks? No tools, our personnel are responsible for visually observing construction activities and noting contractor activity and methods with a clipboard and pen.   7.  If your employees will use no tools, will they engage in any other type of manual                hands-on efforts in completing their tasks? No, there are no hands-on or manual labor 8.  Are you going to be hiring any subcontractors for this project? No, we will not be hiring any subcontractors 9.  When will your work be completed?           During the project.                      CWE Project No. 20311</text_data><comment_date>2021-04-29T00:00:00</comment_date></row><row _id="row-uzyr_v9km~qzw5" _uuid="00000000-0000-0000-4BF9-8A1D0E56306D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzyr_v9km~qzw5"><intent_id>753625</intent_id><project_id>785339</project_id><text_data>Repair existing irrigation and lawn areas using 13hp walk-behind trencher, 5hp sod cutter, 45hp skid loader, wheel barrow and landscaping hand tools.</text_data><comment_date>2016-03-28T00:00:00</comment_date></row><row _id="row-22rb-ypj9_c6wp" _uuid="00000000-0000-0000-EA00-398C68374621" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22rb-ypj9_c6wp"><intent_id>1193763</intent_id><project_id>914041</project_id><text_data>Install cable, antennas and battery backup for installation of a Distributed Antenna System inside building located at 22420 Military Road S, Seatac, WA  98198</text_data><comment_date>2021-11-17T00:00:00</comment_date></row><row _id="row-3jev-ck4v~jcip" _uuid="00000000-0000-0000-31E0-4964C1139314" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3jev-ck4v~jcip"><intent_id>572311</intent_id><project_id>705896</project_id><text_data>We re installing extruded curb.  19 years ago LnI told us to use General Laborer.</text_data><comment_date>2013-05-30T00:00:00</comment_date></row><row _id="row-2dw9.yxkt_ry34" _uuid="00000000-0000-0000-B702-F4FEF6236901" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2dw9.yxkt_ry34"><intent_id>618608</intent_id><project_id>730183</project_id><text_data>The truck operated in the Truck Drivers/Other Trucks classification is an International water truck, GWT 20000 used for flushing streets.</text_data><comment_date>2014-03-04T00:00:00</comment_date></row><row _id="row-tksa.hsas_wp73" _uuid="00000000-0000-0000-C842-D998626691B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tksa.hsas_wp73"><intent_id>818585</intent_id><project_id>814618</project_id><text_data>Job #110517-001</text_data><comment_date>2017-03-02T00:00:00</comment_date></row><row _id="row-fq6j_3yfj-n29s" _uuid="00000000-0000-0000-4C95-4047375127A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fq6j_3yfj-n29s"><intent_id>1231663</intent_id><project_id>1006207</project_id><text_data>Other Truck= LowboyOther Truck= Water Truck</text_data><comment_date>2022-05-06T00:00:00</comment_date></row><row _id="row-sbcg~9hvd-kd9g" _uuid="00000000-0000-0000-9904-B2A50771D400" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sbcg~9hvd-kd9g"><intent_id>877213</intent_id><project_id>836312</project_id><text_data>applying sealer to concrete</text_data><comment_date>2017-12-01T00:00:00</comment_date></row><row _id="row-z26n.s7jz~e7wc" _uuid="00000000-0000-0000-4FE5-5DF658975742" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z26n.s7jz~e7wc"><intent_id>651156</intent_id><project_id>743064</project_id><text_data>#1-Install Ductless Heat Pump #2 Single Family Dwelling #3 One Level #4 a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no k) no #5 yes #6 yes #7 no #8 no</text_data><comment_date>2014-08-28T00:00:00</comment_date></row><row _id="row-ydv2~piq2_exfn" _uuid="00000000-0000-0000-A573-28BC9DFA7472" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ydv2~piq2_exfn"><intent_id>1063376</intent_id><project_id>849878</project_id><text_data>Project is construction of new School.  Our scope of work is to hydroseed grass areas with a 75hp Bowie Hydroseeder and Install big roll sod on prepared surface using 25 hp Sod Installers.</text_data><comment_date>2020-06-08T00:00:00</comment_date></row><row _id="row-2nun_dq64_thhj" _uuid="00000000-0000-0000-00DF-713BA0E952EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2nun_dq64_thhj"><intent_id>840563</intent_id><project_id>824377</project_id><text_data>Provide men and equipment to perform annual crane inspections for the City of Anacortes Waste Water. Scissor lift and company vehicle will be only equipment on-site.</text_data><comment_date>2017-06-28T00:00:00</comment_date></row><row _id="row-mu5x.k97j.7sma" _uuid="00000000-0000-0000-C442-79CE2B41776F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mu5x.k97j.7sma"><intent_id>854978</intent_id><project_id>827661</project_id><text_data>Plumbing and Pipe-fitting Fringe Includes:$9.01 Health and Welfare, $4.56 WA Pension, $3.23 National Pension, $4.25Supplemental Pension,1.88 JACT, $.10 ITF, $.10 MCA Dues, $.50 Industry Improvement Fund, $5.5 Vacation, $1.2 Assessment Check Off</text_data><comment_date>2017-08-15T00:00:00</comment_date></row><row _id="row-jajb.w8e6~cy4p" _uuid="00000000-0000-0000-E8CD-33A24825DF3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jajb.w8e6~cy4p"><intent_id>612038</intent_id><project_id>727349</project_id><text_data>Tune &amp; Clean Electric Furnace</text_data><comment_date>2014-01-14T00:00:00</comment_date></row><row _id="row-e2ht_8uae_skvw" _uuid="00000000-0000-0000-1185-EB83F904D95C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e2ht_8uae_skvw"><intent_id>888011</intent_id><project_id>843574</project_id><text_data>Bartlett PO#45860</text_data><comment_date>2018-02-13T00:00:00</comment_date></row><row _id="row-xh7n_xzt7~5yq3" _uuid="00000000-0000-0000-2431-BE62AEB2F13E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xh7n_xzt7~5yq3"><intent_id>915735</intent_id><project_id>847014</project_id><text_data>Filed by Ralph White</text_data><comment_date>2018-07-03T00:00:00</comment_date></row><row _id="row-idji.m9dq_mbqt" _uuid="00000000-0000-0000-0066-46F848FCD106" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-idji.m9dq_mbqt"><intent_id>654133</intent_id><project_id>732764</project_id><text_data>PENSION - 5.50/HRHEALTH/WELFARE - 7.41/HRAPPRENTICESHIP - .73/HRSUBSTANCE ABUSE PROGRAM - .06/HRSTEP 1 APPRENTICE DOES NOT HAVE PENSION</text_data><comment_date>2014-09-12T00:00:00</comment_date></row><row _id="row-39qq_udss-4by5" _uuid="00000000-0000-0000-12D0-59D0CFE93A62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39qq_udss-4by5"><intent_id>1230943</intent_id><project_id>1011593</project_id><text_data>Job#21357</text_data><comment_date>2022-05-04T00:00:00</comment_date></row><row _id="row-cnq7~zfs2_sns6" _uuid="00000000-0000-0000-DD0C-194C0F410B0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cnq7~zfs2_sns6"><intent_id>668318</intent_id><project_id>750021</project_id><text_data>Prime Job# 3143699; Picked up and disposed of pole damage by auto vehicle.</text_data><comment_date>2014-12-03T00:00:00</comment_date></row><row _id="row-3d8h~f2q6.24c8" _uuid="00000000-0000-0000-8502-5B21877FC687" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3d8h~f2q6.24c8"><intent_id>1169923</intent_id><project_id>975477</project_id><text_data>Fringes: Vacation $5.50, Assessment $1.30, Insurance $9.01, Pension $12.36, Training $2.33, Industry Improvement $.50</text_data><comment_date>2021-08-17T00:00:00</comment_date></row><row _id="row-mgiy~wt7i.gpg5" _uuid="00000000-0000-0000-8A18-B0AB83F49F10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mgiy~wt7i.gpg5"><intent_id>986573</intent_id><project_id>876138</project_id><text_data>Blade operator is used for grading the project site to achieve compaction before paving operations.</text_data><comment_date>2019-06-21T00:00:00</comment_date></row><row _id="row-9nxb_bh5d-anza" _uuid="00000000-0000-0000-A6C5-AF3B2C045CFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9nxb_bh5d-anza"><intent_id>681320</intent_id><project_id>756613</project_id><text_data>This is a remodel project for DOR, they have hired us to complete the project, we will not perform any work, my sub contractors ie: Framers, Drywall, Electricians, and HVAC guys, will be my sub contractors.Subcontractors will provide all materials, tools, and anything else required to perform the work.</text_data><comment_date>2015-03-03T00:00:00</comment_date></row><row _id="row-7k6p-9v2z-qr2h" _uuid="00000000-0000-0000-865B-B64CAD582742" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7k6p-9v2z-qr2h"><intent_id>862999</intent_id><project_id>832701</project_id><text_data>JOC-03-009</text_data><comment_date>2017-09-15T00:00:00</comment_date></row><row _id="row-8r8t-hxnf-d83c" _uuid="00000000-0000-0000-6807-FC2687A1EE1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8r8t-hxnf-d83c"><intent_id>530816</intent_id><project_id>694640</project_id><text_data>Truck Other  - is a regular pick-up truck, F-350. Carries tools and small equipment used for project.</text_data><comment_date>2012-09-04T00:00:00</comment_date></row><row _id="row-q936_i79p_fvff" _uuid="00000000-0000-0000-E56A-AD8EED2F657E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q936_i79p_fvff"><intent_id>867259</intent_id><project_id>834371</project_id><text_data>Elect Tech(06)Inside workAccess Control Cabling</text_data><comment_date>2017-10-05T00:00:00</comment_date></row><row _id="row-dr8a.wn8x~3srn" _uuid="00000000-0000-0000-BFC5-7EFB129B2858" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dr8a.wn8x~3srn"><intent_id>559128</intent_id><project_id>690362</project_id><text_data>PENSION - 5.50/HRHEALTH/WELFARE - 7.41/HRAPPRENTICESHIP - .69/HRSUBSTANCE ABUSE PROGRAM - .06/HRSTEP 1 APPRENTICE DOES NOT HAVE PENSION</text_data><comment_date>2013-03-07T00:00:00</comment_date></row><row _id="row-k525_ckt2-wurb" _uuid="00000000-0000-0000-ABB9-EE728113D94C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k525_ckt2-wurb"><intent_id>658544</intent_id><project_id>745880</project_id><text_data>Technician ran Cat6 wire that will be used for a VoIP telephone system - bits and bytes only.</text_data><comment_date>2014-10-12T00:00:00</comment_date></row><row _id="row-ymn2_cxk9-ytqk" _uuid="00000000-0000-0000-7180-C2E8F8689F35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ymn2_cxk9-ytqk"><intent_id>546613</intent_id><project_id>699766</project_id><text_data>As Requested by email sent 12/4/12:Fringe benefits for $10.65Retirement - $0.57, Medical- $3.56, Vacation - $2.03, Holiday $.97, Company Vehicle - $3.52Finge Benefits for $12.33 As required from Northwest Laborers Employers Trust FundsHealth - $5.30, Pension - $4.50, Training - $0.45, Credit Union - $1.00, Union Dues $1.00, LPL - $0.03, CET - $0.05</text_data><comment_date>2012-12-08T00:00:00</comment_date></row><row _id="row-t4u3-se5e-ny5v" _uuid="00000000-0000-0000-67E7-E257E3ED164A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t4u3-se5e-ny5v"><intent_id>1264862</intent_id><project_id>1030043</project_id><text_data>Owner operated excavatorLaborer used hand rake, shovel, broom</text_data><comment_date>2022-09-08T00:00:00</comment_date></row><row _id="row-q5k6_s43v~pgxp" _uuid="00000000-0000-0000-14B8-3B8828CC59A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5k6_s43v~pgxp"><intent_id>836586</intent_id><project_id>822759</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 5e for voice (telephone) and data (computer networking ) indoors.  Physical location: 11800 SE 216th St, Kent, Wa  98031</text_data><comment_date>2017-05-26T00:00:00</comment_date></row><row _id="row-5cx5_k3s7_5s7d" _uuid="00000000-0000-0000-8A02-0CCA4413EB35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5cx5_k3s7_5s7d"><intent_id>772241</intent_id><project_id>795992</project_id><text_data>Seattle City Light runs off of the existing DES contract dates are correct</text_data><comment_date>2016-07-15T00:00:00</comment_date></row><row _id="row-5wkn~56kz-676u" _uuid="00000000-0000-0000-1E8B-2AB69F103611" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5wkn~56kz-676u"><intent_id>1518275</intent_id><project_id>1175697</project_id><text_data>Equipment to be utilized for this project is limited to. Commercial equipment, mowers different sizes, leaf blowers, backpack blower, trimmers, line trimmers, commercial dump truck,</text_data><comment_date>2025-03-16T00:00:00</comment_date></row><row _id="row-ug8g~yefz.x7b7" _uuid="00000000-0000-0000-35B8-DFD75B02A8B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ug8g~yefz.x7b7"><intent_id>1274398</intent_id><project_id>1030963</project_id><text_data>Whole Proj:  Construct curbs, gutters, sidewalks, walls, bike lanes, storm drainage improvements, paving, landscaping, irrigation, traffic signals &amp; street lights.Our Portion:  The beautification of areas adjacent to the road through the installation of topsoil, bark mulch, trees, shrubs, sod and seeded lawn areas and automatic irrigation system.Equip:  Mini Excavator 37hp &amp; Backhoe 70hp (both under the 90hp threshold for landscape equip) dump truck, hydroseed truck, hand tools.Other Trucks:  Chevy Tiltmaster &amp; equipment trailer, Freightliner both trucks used to haul materials and equipment to the site</text_data><comment_date>2022-10-12T00:00:00</comment_date></row><row _id="row-eifb~2b2s_sum6" _uuid="00000000-0000-0000-21AB-A55BEAFB2B8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eifb~2b2s_sum6"><intent_id>1194691</intent_id><project_id>988882</project_id><text_data>9877176</text_data><comment_date>2021-11-22T00:00:00</comment_date></row><row _id="row-itu3~d9xh_wyt4" _uuid="00000000-0000-0000-19A2-954EB0340FC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-itu3~d9xh_wyt4"><intent_id>709379</intent_id><project_id>768099</project_id><text_data>Installation of Trendway ceiling high wall product to create a conference room</text_data><comment_date>2015-07-24T00:00:00</comment_date></row><row _id="row-juxm.tpac.z472" _uuid="00000000-0000-0000-6F16-A2680B4097C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-juxm.tpac.z472"><intent_id>1078307</intent_id><project_id>903522</project_id><text_data>B.B.Provide labor to install speakersand equipmentin the following types and quantities:1.(64) IP speakerclock location(s)2.(5) ExistingIP speaker clock location(s)3.(37) Analog wallmount speaker location(s)4.(5) Analoginterior wall mount horn type speaker location(s)5.(35) Analoginterior ceiling mount speaker location(s)6.(3) Analogexterior horn speaker location(s)7.(2) Amplifiers and zone controllers in the MDF/IDFC.Provide labor to install access control equipment and devises in the follow location types and quantities:1.(4) PoE interface boards and devices specific to single door locations2.(5) PoE interface boards and devices specific to double door locations3.(1) Exterior video/intercom device4.(1) Master intercom station within customer dedicated location5.(3) Security flasher location(s)6.(3) Lockdown button location(s)7.(4) Doorrelease button location(s)Provide labor to install speakersand equipmentin the following types and quantities:1.(64) IP speakerclock location(s)2.(5) ExistingIP speaker clock location(s)3.(37) Analog wallmount speaker location(s)4.(5) Analoginterior wall mount horn type speaker location(s)5.(35) Analoginterior ceiling mount speaker location(s)6.(3) Analogexterior horn speaker location(s)7.(2) Amplifiers and zone controllers in the MDF/IDFC.Provide labor to install access control equipment and devises in the follow location types and quantities:1.(4) PoE interface boards and devices specific to single door locations2.(5) PoE interface boards and devices specific to double door locations3.(1) Exterior video/intercom device4.(1) Master intercom station within customer dedicated location5.(3) Security flasher location(s)6.(3) Lockdown button location(s)7.(4) Doorrelease button location(s)</text_data><comment_date>2020-08-31T00:00:00</comment_date></row><row _id="row-4uix.7mi2~5y4k" _uuid="00000000-0000-0000-8EA0-B28DE13B326C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4uix.7mi2~5y4k"><intent_id>521010</intent_id><project_id>678959</project_id><text_data>Per Laura &amp;quot; Based upon the information provided, this work is not covered&amp;quot;</text_data><comment_date>2012-08-16T00:00:00</comment_date></row><row _id="row-7z2n.8j4s.tzbw" _uuid="00000000-0000-0000-A632-DFED76A8EF6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7z2n.8j4s.tzbw"><intent_id>695032</intent_id><project_id>762467</project_id><text_data>1. Insulation, window installation. 2. apartment. 3. 1. 4. a. no, b. no, c. yes, d. no, e. no, f. no, g. no, h.no,i. no, j.yes, k. no. 5. yes. 6.yes, 7. no. 8. no</text_data><comment_date>2015-05-18T00:00:00</comment_date></row><row _id="row-pc7x_xez4-az59" _uuid="00000000-0000-0000-58BA-12D738AE1B80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pc7x_xez4-az59"><intent_id>524612</intent_id><project_id>544387</project_id><text_data>Sent e-mail:  We approved this form at the �Truck Drivers/Other Trucks� classification for operation of vacuum/vactor/eductor equipment. However, for future projects put out for bid on or after October 10, 2011, you may not use �Truck Drivers/Other Trucks� for this work.On September 27, 2011, the Industrial Statistician issued a determination that the proper prevailing wage classification for the operation of vacuum/vactor/eductor equipment (vactor equipment) is under the Power Equipment Operators (PEO) scope of work, WAC 296 127-01354 (Operating Engineers). The sub-classification specifically for vactor equipment is generally listed as �Vactor Guzzler, Super Sucker,� �Truck, Vacuum (Group 5),� or �Journey Level� depending upon the county. For counties where there is no specific vactor equipment sub-classification listed we use the �pay band� approach for identifying the appropriate wage rate. Thus, when there is no specific sub-classification in the county, we are applying the �Motor Patrol Grader (Finishing)� classification as it corresponds to the appropriate pay band rate for that vactor equipment work.The September 27, 2011, determination also clarifies that the proper classification for a worker who accompanies the operator in the performance of the vactor tasks, but who does not directly operate the equipment, i.e., a �helper,� may be paid as a �Laborer/Nozzleman� rather than at the �Vactor Guzzler� or �General Laborer� rate.  If performing actual �General Labor� duties such as shoveling, raking, sweeping, etc., these hours must be tracked separately from the time spent assisting with the vacuuming work as those hours are paid at the higher �Laborer/Nozzleman� rate.The September 27, 2011, determination will be applied prospectively to contracts put out for bid on or after October 10, 2011. Please be sure to file according to these instructions to avoid delay in our approval of any forms you may submit in the future for vactor equipment. If you have questions, please contact us at: pw1@Lni.wa.gov or (360) 902-5335.</text_data><comment_date>2012-07-27T00:00:00</comment_date></row><row _id="row-ezug~rzqr.ir22" _uuid="00000000-0000-0000-80FE-E376D1E76A8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezug~rzqr.ir22"><intent_id>446920</intent_id><project_id>662374</project_id><text_data>Up to 20 jobs for this Intent</text_data><comment_date>2011-03-14T00:00:00</comment_date></row><row _id="row-a5ba~bysc-z9in" _uuid="00000000-0000-0000-CEE6-D073B2B9EE7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5ba~bysc-z9in"><intent_id>738435</intent_id><project_id>772545</project_id><text_data>Work Performed:1.	Dismantle existing fuel piping manifolds inside dispenser sumps.2.	Drain below ground fuel lines.3.	Disconnect all fuel supply lines to and from the dispensers.4.	Remove dispensers, externally mounted fuel filter manifolds, hanging hardware and hose retractors.5.	Reroute and/or decommission vapor return piping inside of gasoline dispenser sumps.6.	Modify and reroute existing fuel supply lines to correctly line up with new fuel dispensers.7.	Install and fit new supply lines in new fuel dispensers. 8.	Mount new fuel dispensers and retro fit dispenser mounts to work with existing in ground sumps. 9.	Once dispensers are mounted I installed all nozzles, hoses, break away valves and tested system for leaks. Tools Used:�	12�, 18� 24� adjustable �cresent� style wrench�	Flat blade and Phillips style screw drivers�	Various sizes of box end wrenches�	Roto-Hammer concrete drill�	Hammer�	Pliers and channel locks�	Drill�	High speed steel drill bits�	18� 24� and 36� pipe wrenchs�	Allen Keys�	3/8� and &amp;#189;� drive ratchets and assorted sockets�	4� angle grinder with cutoff wheels�	White lithium grease�	Truck mounted vise�	210v 211 amp MIG welder�	Floor mounted drill press�	Pedestal mounted 6� grinder�	4� abrasive wheels�	Bi-metal 2� hole saw�	Hand held metal files of various sizes</text_data><comment_date>2016-02-16T00:00:00</comment_date></row><row _id="row-7dk8.jqff_vk6i" _uuid="00000000-0000-0000-EF49-2D658EE336BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7dk8.jqff_vk6i"><intent_id>1131305</intent_id><project_id>948208</project_id><text_data>PPC #20138</text_data><comment_date>2021-03-24T00:00:00</comment_date></row><row _id="row-4mnw-vx5i-82h2" _uuid="00000000-0000-0000-2FC4-AB0BAD7B8C67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4mnw-vx5i-82h2"><intent_id>1178958</intent_id><project_id>928472</project_id><text_data>Install approx 890 Yds of Compost material with Blower truck and loader tractor2 - Blower Truck Operators1- Equipment Operator (Loader tractor/Forklift)1 - General Laborer  - hold &amp; move the hose placing material into designated areas.</text_data><comment_date>2021-09-20T00:00:00</comment_date></row><row _id="row-xktw_5inq-93nj" _uuid="00000000-0000-0000-E1B7-83C33CD86B95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xktw_5inq-93nj"><intent_id>1065906</intent_id><project_id>919222</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2020-06-22T00:00:00</comment_date></row><row _id="row-fhwj-gehi_cwy5" _uuid="00000000-0000-0000-57EC-3B6A8412C83C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fhwj-gehi_cwy5"><intent_id>1218932</intent_id><project_id>1004336</project_id><text_data>9886686</text_data><comment_date>2022-03-18T00:00:00</comment_date></row><row _id="row-w3u6_crka~2aj7" _uuid="00000000-0000-0000-49E0-9048CFCF0ACC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w3u6_crka~2aj7"><intent_id>477780</intent_id><project_id>674334</project_id><text_data>Replenish cedar playchips at all elementry schools within Edmonds School District. Installation via a blower truck using 4&amp;quot; blower hoses.</text_data><comment_date>2011-09-13T00:00:00</comment_date></row><row _id="row-k429.c96r-xpqk" _uuid="00000000-0000-0000-052A-8FB30D30BC84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k429.c96r-xpqk"><intent_id>611579</intent_id><project_id>701264</project_id><text_data>Row 1: Usual Benefits (fringe Breakdown) Vac:$1.22; Med: $2.71 =$3.93Row 2: Usual Benefits (fringe Breakdown) Vac:$1.18; Med: $3.07; IRA $.69 =$4.94This is a federally funded job</text_data><comment_date>2014-01-10T00:00:00</comment_date></row><row _id="row-pb2x-8sf4.g6q3" _uuid="00000000-0000-0000-CDCD-062F28C8DD6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pb2x-8sf4.g6q3"><intent_id>747398</intent_id><project_id>785390</project_id><text_data>Invoice # 18819Employees drive 350 Chevy Silverado Truck to and from jobsite.</text_data><comment_date>2016-02-18T00:00:00</comment_date></row><row _id="row-972v_czmc-48is" _uuid="00000000-0000-0000-FCAD-D37A08E1D37C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-972v_czmc-48is"><intent_id>959009</intent_id><project_id>872612</project_id><text_data>Job #116685-001</text_data><comment_date>2019-02-06T00:00:00</comment_date></row><row _id="row-v6wv_u7h3_wzwk" _uuid="00000000-0000-0000-5467-2BB8A630ED49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v6wv_u7h3_wzwk"><intent_id>865894</intent_id><project_id>833826</project_id><text_data>This project consists of removing 32 small trees in landscape planting areas that are diseased, dead or in the process of dying. The trees are less than 12 foot tall, and have a DBH of less than 6 inches. Tools to be used will include saw, wheelbarrows, rakes, buckets, a stump killing chemical and a backpack blower for the purpose of cleaning up debris from the work.</text_data><comment_date>2017-09-28T00:00:00</comment_date></row><row _id="row-5ddq~wazy~ibhi" _uuid="00000000-0000-0000-08F3-209BB6DBD2C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ddq~wazy~ibhi"><intent_id>1225086</intent_id><project_id>1008237</project_id><text_data>Other Truck is 4,000 gallon water truck</text_data><comment_date>2022-04-12T00:00:00</comment_date></row><row _id="row-fqnd.q2su_7qug" _uuid="00000000-0000-0000-95F6-359A8439D99C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fqnd.q2su_7qug"><intent_id>950831</intent_id><project_id>840001</project_id><text_data>Project is exempt from State Prevailing Wage Rates based on the Housing Act of 1937 &amp; 24 CFR 965.101. All workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades/occupations</text_data><comment_date>2018-12-14T00:00:00</comment_date></row><row _id="row-yrv9.pjwr_7bay" _uuid="00000000-0000-0000-9693-B48427C7E36A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yrv9.pjwr_7bay"><intent_id>773220</intent_id><project_id>795284</project_id><text_data>pacific module structures 600498022 to electric smith 601288766 to simplexgrinnell 602113334</text_data><comment_date>2016-07-07T00:00:00</comment_date></row><row _id="row-mnde-wdu7_kadf" _uuid="00000000-0000-0000-B288-D464588EAEEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mnde-wdu7_kadf"><intent_id>1264552</intent_id><project_id>1022679</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project? Emergency outage to repair telecommunications2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No3. Does this specific project entail the remodeling or new construction of a facility? No4. If your firm is working upon a type of building system, what type of system is involved? telecommunication cabling outside plant right of way5. What specific tasks will your employees perform? Our employees performed no work on site6. What, if any, tools will your employees use in the performance of those tasks? NA7. If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? NA8. Are you going to be hiring any subcontractors for this project? Work was given to sub9. When is your work to be completed? Planning or preconstruction phase or during the public works project? Work completed day of, this was an emergency response within 1 hour of call to restore down network</text_data><comment_date>2022-09-26T00:00:00</comment_date></row><row _id="row-gkwj~wtx5~dc37" _uuid="00000000-0000-0000-D954-CD7AF46F52E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gkwj~wtx5~dc37"><intent_id>790793</intent_id><project_id>767889</project_id><text_data>Project: WSU academic Bldg (Everett)This letter is intended to address our request for an exemption for prevailing wages for the subject project. The project name is as stated in the Subject line above. Our subcontract is with Cochran Inc. who has hired us to perform professional services, specifically the task of electrical testing for the subject project. The testing involves performing acceptance/quality tests of ground resistance testing, medium voltage switch testing, circuit breaker testing, and transformer testing. 1. Purpose of Project:a. The purpose of the work performed by Sigma Six Solutions is to provide professional electrical testing services to check the quality of specific electrical parameters associated with the electrical distribution system.2. Remodeling or New Construction:a. Sigma Six�s work does not entail remodeling or construction activities or tasks; the work to be performed is only electrical testing. However, the work of Cochran Inc. does involve new construction. 3. Specific Tasks Performed by Sigma Six Solutions:a. Cochran Inc. Co. craftsmen (IBEW electricians) will perform all labor and tool work associated with any assembly and installation work. The electrical testing performed by Sigma Six Solutions� field engineers and technicians will not involve any disassembly or re-assembly activity. b. A sigma Six employee will operate portable test equipment to perform the tests on the subject components. The test equipment is owned by Sigma Six and is not part of the project or product involved. Not tool work, assembly, disassembly, or any other construction craft activity will be performed by any Sigma Six employee. All such labor will be performed by Cochran Inc. electricians. c. A Sigma Six employee will record data observed during testing and provide Cochran Inc. with a written report of test results. d. At the completion of the testing, Cochran Inc. electricians will proceed with their construction activities to energize the electrical equipment. 4. Tools Used by Sigma Six Solutions:a. No hand or construction tools will be used by Sigma Six employees. All tool work will be performed by Cochran Inc. electricians as described above.5. Sigma Six Employee Hands-On Effort:a. A Sigma Six employee will operate portable test instrument owned by Sigma Six Solutions and record data for the report.</text_data><comment_date>2016-09-21T00:00:00</comment_date></row><row _id="row-xcuj.k3ym~cg3u" _uuid="00000000-0000-0000-7F7D-6A07944A7613" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xcuj.k3ym~cg3u"><intent_id>965470</intent_id><project_id>863141</project_id><text_data>HD Fowler Company hired Speer Taps as a sub-tier contractor to perform work on this project.</text_data><comment_date>2019-03-15T00:00:00</comment_date></row><row _id="row-qdv7_7z9i-d8wq" _uuid="00000000-0000-0000-FFD4-5908DED2E906" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qdv7_7z9i-d8wq"><intent_id>931003</intent_id><project_id>832953</project_id><text_data>Our general laborers unload and distribute cabinets from our delivery truck to various rooms on the jobsite.  The only tools used are hand trucks and rolling carts.Our trucks are 14� and 26� box trucks for delivery of cabinets.</text_data><comment_date>2018-09-06T00:00:00</comment_date></row><row _id="row-5j2a-qx75~6cc2" _uuid="00000000-0000-0000-7918-6DC83BD7FC1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5j2a-qx75~6cc2"><intent_id>959833</intent_id><project_id>870875</project_id><text_data>we will be installing all new trees shrubs ground covers and bark for the above named project</text_data><comment_date>2019-02-12T00:00:00</comment_date></row><row _id="row-vyf8_txmn-qkkw" _uuid="00000000-0000-0000-CDC9-8A8934E30AEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vyf8_txmn-qkkw"><intent_id>894395</intent_id><project_id>829780</project_id><text_data>#1 - We will be installing gutters and downspouts. to low income#2 - Low income apartments#3 - (2)Three Story (5) Two story (7 Buildings total)#4A- NOB- NOC- YESD- NOE- NOF- NOG- NOH- NOI- NOJ- NOK- NOL- NO#5 YES#6 YES#7 YES#8 NOI- NO</text_data><comment_date>2018-03-22T00:00:00</comment_date></row><row _id="row-ddm4_vdvs~ahra" _uuid="00000000-0000-0000-C478-992FEF80FDC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ddm4_vdvs~ahra"><intent_id>1136678</intent_id><project_id>958648</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2021-04-21T00:00:00</comment_date></row><row _id="row-jstw_2at2~a3dh" _uuid="00000000-0000-0000-DD08-AB00C41EB220" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jstw_2at2~a3dh"><intent_id>1092698</intent_id><project_id>847985</project_id><text_data>Operators health 8.57; pension 13.15; training.70; 612 U.P. .30; int trng.05; 612 FPAC .05Laborers health 6.70; pension 4.79; training.95; LECET .14; WCISAP .06</text_data><comment_date>2020-12-09T00:00:00</comment_date></row><row _id="row-syec.7jc9_wtyf" _uuid="00000000-0000-0000-679F-14EDE9D614AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-syec.7jc9_wtyf"><intent_id>541799</intent_id><project_id>698570</project_id><text_data>1126546</text_data><comment_date>2012-10-26T00:00:00</comment_date></row><row _id="row-3x9e-7mp7_rjr5" _uuid="00000000-0000-0000-2A07-E638DC7D6BB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3x9e-7mp7_rjr5"><intent_id>874705</intent_id><project_id>837422</project_id><text_data>1)We were contracted to replace a hot water heater. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-11-14T00:00:00</comment_date></row><row _id="row-qqm6_dqfr-ddkg" _uuid="00000000-0000-0000-D092-D8C647392000" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qqm6_dqfr-ddkg"><intent_id>1140041</intent_id><project_id>953997</project_id><text_data>We do not know the entire scope of this project as we are only performing the erosion control portion. Our laborers use hand tools like picks, shovels, and post pounders to install temporary erosion and sediment control products.</text_data><comment_date>2021-04-27T00:00:00</comment_date></row><row _id="row-injx-npp2~rur3" _uuid="00000000-0000-0000-6D91-9CF20A7F9F4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-injx-npp2~rur3"><intent_id>694273</intent_id><project_id>754111</project_id><text_data>TOTAL FRINGE IS SENT TO A QUALIFIED PENSION PLAN.  PLAN IS 100% IMMEDIATELY VESTED AND PAID MONTHLY.</text_data><comment_date>2015-05-13T00:00:00</comment_date></row><row _id="row-uwe5.fq6v_fjj8" _uuid="00000000-0000-0000-8313-9D9E8C099F11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwe5.fq6v_fjj8"><intent_id>599701</intent_id><project_id>721276</project_id><text_data>01463800 was already filled in on the intent.</text_data><comment_date>2013-10-18T00:00:00</comment_date></row><row _id="row-rgie~stza.7q6c" _uuid="00000000-0000-0000-F424-16D6FA2188EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rgie~stza.7q6c"><intent_id>859512</intent_id><project_id>831369</project_id><text_data>**8/30/2017**Pumphrey-Collier1)TUNE UP ELECTRIC FURNACE2)SINGLE FAMILY3)1STORY WITH BASEMENT4)a-no b-no c-yes d-no e-no f-no g-no h-no I-no j-no k-none5)YES6)YES7)NO8)NO</text_data><comment_date>2017-08-30T00:00:00</comment_date></row><row _id="row-mvkf_r5rs.fyfe" _uuid="00000000-0000-0000-5408-A0EAD3DECECD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mvkf_r5rs.fyfe"><intent_id>596647</intent_id><project_id>721008</project_id><text_data>3840</text_data><comment_date>2013-09-30T00:00:00</comment_date></row><row _id="row-s3ah-c7k3.t968" _uuid="00000000-0000-0000-056F-2B3C52E58809" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s3ah-c7k3.t968"><intent_id>1025487</intent_id><project_id>898916</project_id><text_data>200404.01</text_data><comment_date>2019-12-06T00:00:00</comment_date></row><row _id="row-v29e~rfht-yrpc" _uuid="00000000-0000-0000-AF1C-DBF045368230" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v29e~rfht-yrpc"><intent_id>807322</intent_id><project_id>807225</project_id><text_data>Filed by Tim BrakkeProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2016-12-15T00:00:00</comment_date></row><row _id="row-6ezs.hykg~kht4" _uuid="00000000-0000-0000-AD09-943F5EB2AE45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ezs.hykg~kht4"><intent_id>979461</intent_id><project_id>877728</project_id><text_data>We will be trenching for an automatic sprinkler system, installing sod, mounded planter beds, installing trees and shrubs, rock mulch, and final grading.</text_data><comment_date>2019-05-22T00:00:00</comment_date></row><row _id="row-9c6v~x7sg_ce33" _uuid="00000000-0000-0000-FA41-2C8A8EF1AC2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9c6v~x7sg_ce33"><intent_id>930830</intent_id><project_id>860690</project_id><text_data>1 electrical, home repair, carpentry, 2 yes 3 2 4 a no b no c d no e no f no g no h no i no k no l 5 no 6 no 7no 8 no</text_data><comment_date>2018-09-05T00:00:00</comment_date></row><row _id="row-vdys~uy9j.fqsq" _uuid="00000000-0000-0000-822B-44899AB70A85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vdys~uy9j.fqsq"><intent_id>981846</intent_id><project_id>882889</project_id><text_data>Scope of work is to perform landscape maintenance tasks such as weeding and trash removal on previously landscaped areas including stormwater facilities and riparian plantings, using hand tools such as string trimmers and shovels.</text_data><comment_date>2019-06-03T00:00:00</comment_date></row><row _id="row-aj8t.pwks~4v89" _uuid="00000000-0000-0000-DAF2-76B6427B33CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aj8t.pwks~4v89"><intent_id>1183278</intent_id><project_id>967530</project_id><text_data>1) Parapet framing2) Apartment3)  24)  Rental    a)  no	b)  no	c)  yes    d)  no 	e)  no	f)  no	g)  no	h)  no	i)  no	j)  no	k)  yes5)  Yes6)  Yes7)  Yes8)  No</text_data><comment_date>2021-10-05T00:00:00</comment_date></row><row _id="row-5m4p-jf7j-rk83" _uuid="00000000-0000-0000-2937-5F6ED55AAC37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5m4p-jf7j-rk83"><intent_id>843638</intent_id><project_id>825614</project_id><text_data>Filed by Cory Eckert.</text_data><comment_date>2017-06-27T00:00:00</comment_date></row><row _id="row-uwp8-esqa~dbxj" _uuid="00000000-0000-0000-5718-8F23E027D8C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwp8-esqa~dbxj"><intent_id>568599</intent_id><project_id>604129</project_id><text_data>Form filed by: Minerva Morales</text_data><comment_date>2013-05-08T00:00:00</comment_date></row><row _id="row-7g8v_en85~4tkb" _uuid="00000000-0000-0000-7A43-5A5B290B1471" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7g8v_en85~4tkb"><intent_id>859921</intent_id><project_id>828770</project_id><text_data>Filed by Chanty GoitLocate underground utilities; spray paint on ground to show where specific utilities are located; use a transmitter and a receiver for the locates and a truck for transportation.</text_data><comment_date>2017-08-31T00:00:00</comment_date></row><row _id="row-idyy-hzg8~8swv" _uuid="00000000-0000-0000-1F04-4C1FB13E9C38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-idyy-hzg8~8swv"><intent_id>695989</intent_id><project_id>759533</project_id><text_data>No</text_data><comment_date>2015-05-21T00:00:00</comment_date></row><row _id="row-2vwi~bvne_3n8i" _uuid="00000000-0000-0000-3221-A0A6EBE4F518" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2vwi~bvne_3n8i"><intent_id>1221302</intent_id><project_id>1005792</project_id><text_data>9886003</text_data><comment_date>2022-03-28T00:00:00</comment_date></row><row _id="row-xehn.6sqa-itat" _uuid="00000000-0000-0000-D528-C9469B5C3609" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xehn.6sqa-itat"><intent_id>840441</intent_id><project_id>817425</project_id><text_data>We are installing the landscaping, irrigation and hydro-seeding for the school project. Using hand tools - shovels, rakes, pipe cutters, wheel barrels and etc. Equipment was under the 90 HP � mini excavator to trench. We will use a trailer hydro-seeder in the landscape areas.</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-az67~8r8i~g3pa" _uuid="00000000-0000-0000-2B51-240680D49B2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-az67~8r8i~g3pa"><intent_id>601946</intent_id><project_id>715315</project_id><text_data>our portion of the project is to install hydroseed per specs on designated and prepared area using a hydroseed installation truck. Hydroseeding is a one-step process.</text_data><comment_date>2013-10-29T00:00:00</comment_date></row><row _id="row-bmyv.mw8y_72yi" _uuid="00000000-0000-0000-0D1C-F13D39DE2F2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmyv.mw8y_72yi"><intent_id>837972</intent_id><project_id>760748</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR &amp; WATER TRUCK</text_data><comment_date>2017-06-02T00:00:00</comment_date></row><row _id="row-8pzh_xdhx-wdfg" _uuid="00000000-0000-0000-2EEC-44EAE7D001F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8pzh_xdhx-wdfg"><intent_id>461879</intent_id><project_id>643059</project_id><text_data>1111073</text_data><comment_date>2011-06-21T00:00:00</comment_date></row><row _id="row-3p5d~tbrw_esjn" _uuid="00000000-0000-0000-3811-28871115C901" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3p5d~tbrw_esjn"><intent_id>719154</intent_id><project_id>771758</project_id><text_data>this is an amended intent due to employees were used on this project (see intent 701588)</text_data><comment_date>2015-09-04T00:00:00</comment_date></row><row _id="row-atdz-y2fj_bhhm" _uuid="00000000-0000-0000-C6CE-D9A47CB5F73F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-atdz-y2fj_bhhm"><intent_id>1166552</intent_id><project_id>966758</project_id><text_data>121068-001</text_data><comment_date>2021-08-05T00:00:00</comment_date></row><row _id="row-zp4r-4i8s~pkhk" _uuid="00000000-0000-0000-9683-6F4619E4571B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zp4r-4i8s~pkhk"><intent_id>593579</intent_id><project_id>718128</project_id><text_data>Filed by Dawie Pan.Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2013-09-13T00:00:00</comment_date></row><row _id="row-h2mr_rygx-vsgk" _uuid="00000000-0000-0000-A4B4-F2CEA4A69E9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2mr_rygx-vsgk"><intent_id>1336337</intent_id><project_id>1069008</project_id><text_data>Truck Driver 'Other' used for truck mounted pick up sweeper and/or 2000-4000 gallon water truck.</text_data><comment_date>2023-06-14T00:00:00</comment_date></row><row _id="row-ntdn.4yqr~z2ia" _uuid="00000000-0000-0000-38E7-8EEF26B66864" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ntdn.4yqr~z2ia"><intent_id>993030</intent_id><project_id>879471</project_id><text_data>Job 1730122</text_data><comment_date>2019-07-18T00:00:00</comment_date></row><row _id="row-wb27_r88f.3p8z" _uuid="00000000-0000-0000-33F1-1C6EFB6012A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wb27_r88f.3p8z"><intent_id>728666</intent_id><project_id>775540</project_id><text_data>Tools that may be used on this job include but are not limited to wire cutters and crimpers.</text_data><comment_date>2015-10-28T00:00:00</comment_date></row><row _id="row-p3vy.85ni.pg5e" _uuid="00000000-0000-0000-0D51-2DE1C5F736DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p3vy.85ni.pg5e"><intent_id>949190</intent_id><project_id>867992</project_id><text_data>Filed by Holly Nehls</text_data><comment_date>2018-12-05T00:00:00</comment_date></row><row _id="row-zukv.b44p.aije" _uuid="00000000-0000-0000-EE58-46433E564043" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zukv.b44p.aije"><intent_id>511493</intent_id><project_id>686928</project_id><text_data>1.  Roadway Improvements2. No.3. No work has been performed at this time.  BTI inspectors and/or Technicians will obtain samples of construction materials being used by the general and/or subcontractors to run laboratory analysis of these materials, i.e.' soils, aggregates, concrete, and asphalt, to verify the materials are according to project specifications.  Inspectors and/or technicians will also perform density/compaction tests and compressive strength testing, as 3rd party verifications of required percentages, stated in project specifications.4.  Specialized lab analysis equipment and nuclear densometers.</text_data><comment_date>2012-05-21T00:00:00</comment_date></row><row _id="row-z8tj_cs86.aef7" _uuid="00000000-0000-0000-20DA-22DF7D013746" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z8tj_cs86.aef7"><intent_id>974600</intent_id><project_id>879745</project_id><text_data>#1. attic penetration and insulation, HVAC ducts, exhaust dryer vent, wrap water supply pipe/ #2. single family dwelling #3. one story #4. a. no b. no c. yes d. no e. no f. no g. no h. no i. no j. no k. no #5. yes #6. yes #7. no #8. no</text_data><comment_date>2019-04-29T00:00:00</comment_date></row><row _id="row-9ui8.mrvh-4pn8" _uuid="00000000-0000-0000-AD6C-388D3AD39EF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ui8.mrvh-4pn8"><intent_id>676871</intent_id><project_id>754663</project_id><text_data>Job # 9020249</text_data><comment_date>2015-01-28T00:00:00</comment_date></row><row _id="row-a2dk.3ksq~eehv" _uuid="00000000-0000-0000-F7E3-172F85BCC645" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a2dk.3ksq~eehv"><intent_id>628599</intent_id><project_id>734559</project_id><text_data>Gil Fonner job #2787</text_data><comment_date>2014-05-07T00:00:00</comment_date></row><row _id="row-6fbg_uziz_h5g6" _uuid="00000000-0000-0000-DC06-3B7ED2338E64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6fbg_uziz_h5g6"><intent_id>661705</intent_id><project_id>747193</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.   Ductless Minisplit installation. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?   Single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? SFR(a) Any commercial use in the structure? no(b) (b) Any retail use in the structure? no(c) (c) Permanent residence only? yes(d) (d) Rehabilitation house? no(e)  (e) Transitional housing? no(f) (f) Communal dining facility? no(g)  (g) Treatment services? no(h) (h) Dormitories? no(i) (i) Counseling? no(j) (j) Is each room and/or bed in the structure rented separately? N/a(k) (k) Other? no#5 - Does each dwelling unit have its own self-contained kitchen? N/a#6 - Does each dwelling unit have its own bathroom?  N/a#7 - Is there a community facility or manager�s office on site? no#8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2014-10-22T00:00:00</comment_date></row><row _id="row-8uia.5hcu.j5tm" _uuid="00000000-0000-0000-F845-A329541DF351" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8uia.5hcu.j5tm"><intent_id>718453</intent_id><project_id>764830</project_id><text_data>TOTAL FRINGE IS SENT TO A QUALIFIED PENSION PLAN, PLAN IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2015-09-02T00:00:00</comment_date></row><row _id="row-pvjk-h7sh_25nb" _uuid="00000000-0000-0000-CB3E-1AA0B2E8B26E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pvjk-h7sh_25nb"><intent_id>881488</intent_id><project_id>812394</project_id><text_data>**We do not have an industrial insurance account in Washington since we are there on a temporary basis. We have Oregon Workers Comp insurance (Saif Policy#439059) and stop gap liability.</text_data><comment_date>2018-01-03T00:00:00</comment_date></row><row _id="row-pqir_39bx_saxx" _uuid="00000000-0000-0000-C826-6DEA4A37223D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqir_39bx_saxx"><intent_id>1321753</intent_id><project_id>1001908</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install distribution cable for voice / data communications. Install copper cables for communications backbone between equipment rooms. Terminate cables in the equipment room and terminate the cables routed between Comm. equipment rooms.</text_data><comment_date>2023-04-21T00:00:00</comment_date></row><row _id="row-nuqm_isyu-3pib" _uuid="00000000-0000-0000-2E7B-07DE9A58A8DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nuqm_isyu-3pib"><intent_id>642496</intent_id><project_id>737547</project_id><text_data>Other truck is a semi truck pulling a belly dump.</text_data><comment_date>2014-07-25T00:00:00</comment_date></row><row _id="row-fb59_tntz_gg6t" _uuid="00000000-0000-0000-DCED-D562FDAF2BC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fb59_tntz_gg6t"><intent_id>664291</intent_id><project_id>721485</project_id><text_data>1 hvac.2. apartment3. 34a=no 4b=no 4c=yes 4d=no 4e=no 4f=no 4g=no 4h=no 4i=no 4j= yes 4k=5= yes6= yes7= yes8= no</text_data><comment_date>2014-11-06T00:00:00</comment_date></row><row _id="row-pb2x~5mqh_5u9x" _uuid="00000000-0000-0000-69DA-952C8428697B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pb2x~5mqh_5u9x"><intent_id>1260942</intent_id><project_id>1023993</project_id><text_data>Residential Maintenance 2. Single Family 3. One Level 4. A. No, B. No, C. Yes, D. No, E. No, F. No, G. No, H. No, I. No, J. No, K. No, L. No 5. Yes 6. Yes 7. No, 8. No</text_data><comment_date>2022-08-24T00:00:00</comment_date></row><row _id="row-7fcr-2nbf~zs4x" _uuid="00000000-0000-0000-128A-BD039CFA0BFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7fcr-2nbf~zs4x"><intent_id>1015019</intent_id><project_id>896049</project_id><text_data>#1 Replace bath fan &amp; hot water tank. #2 Single family mobile home. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2019-10-13T00:00:00</comment_date></row><row _id="row-iw3c-utg5_yq6v" _uuid="00000000-0000-0000-CB61-FA7887716AE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iw3c-utg5_yq6v"><intent_id>713319</intent_id><project_id>769544</project_id><text_data>1. WA2893 - 456 Manley Road, Bellingham2. VE1349 - 2925 Nevada, Bellingham#1 - Describe the work that your firm was contracted to perform. (Weatherization)#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? (Single Family dwelling)#3 - Including any basement or garage, how many stories or levels does the structure have? (1)#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Dormitories? NO(i) Counseling? NO(j) Is each room and/or bed in the structure rented separately? NO(k) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? (NO)#6 - Does each dwelling unit have its own bathroom? (NO)#7 - Is there a community facility or manager�s office on site? (NO)#8 - Is any part of the structure used by members of the public? (NO)</text_data><comment_date>2015-08-10T00:00:00</comment_date></row><row _id="row-ukdy_wfzb-5f4t" _uuid="00000000-0000-0000-C2AB-6E755658A742" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ukdy_wfzb-5f4t"><intent_id>606954</intent_id><project_id>711522</project_id><text_data>ALLIED'S JOB # 131024-0027.219</text_data><comment_date>2013-12-03T00:00:00</comment_date></row><row _id="row-fwg9_rxkk.tkxi" _uuid="00000000-0000-0000-92A2-C447E41A39F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fwg9_rxkk.tkxi"><intent_id>643761</intent_id><project_id>738292</project_id><text_data>Fringe Breakdown:$17.04---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $10.04 Pension$11.40---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $4.40 Pension</text_data><comment_date>2014-07-28T00:00:00</comment_date></row><row _id="row-76mk_wdas-ikf4" _uuid="00000000-0000-0000-A3F9-60FDB37324BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-76mk_wdas-ikf4"><intent_id>722728</intent_id><project_id>773236</project_id><text_data>Single family low income weatherization/ insulation upgrade</text_data><comment_date>2015-09-24T00:00:00</comment_date></row><row _id="row-378q-wir5~unqu" _uuid="00000000-0000-0000-2A04-9B1C1FEC226B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-378q-wir5~unqu"><intent_id>848324</intent_id><project_id>820683</project_id><text_data>Port Madison Enterprises Construction Corporation is a Native American tribally owned company and not required to have an industrial account number.</text_data><comment_date>2017-07-18T00:00:00</comment_date></row><row _id="row-ne6t.h5a9.v79q" _uuid="00000000-0000-0000-6320-21BDE45E08A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ne6t.h5a9.v79q"><intent_id>1000000</intent_id><project_id>890406</project_id><text_data>The truck is a 2007 Mitsubishi FUSO with a scale weight of 8,640 pounds The truck has no attachments and is used for transporting men and equipment to the job site.</text_data><comment_date>2019-08-15T00:00:00</comment_date></row><row _id="row-imxw.s43x.jr62" _uuid="00000000-0000-0000-7760-E94F4F9971AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imxw.s43x.jr62"><intent_id>778196</intent_id><project_id>798233</project_id><text_data>Purchase Order WA170-0000001159 is Not to Exceed (NTE) $9,934.09 and covers the dates 06/29/2016 through 06/30/2016.</text_data><comment_date>2016-07-28T00:00:00</comment_date></row><row _id="row-v78h-qkd9.3pux" _uuid="00000000-0000-0000-43A6-73AB00A1CC56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v78h-qkd9.3pux"><intent_id>309012</intent_id><project_id>602030</project_id><text_data>Installation of underground Irrigation system, 6&amp;quot; dec Organic Mulch, 6&amp;quot; plantinging soil, installation of the trees,shrubs and groundcovers and 1 year landscape maintenance.</text_data><comment_date>2011-05-05T00:00:00</comment_date></row><row _id="row-6y5n-bj9p_53t8" _uuid="00000000-0000-0000-CD58-1CE10C6075E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6y5n-bj9p_53t8"><intent_id>823594</intent_id><project_id>813751</project_id><text_data>A) This contract provides for the improvement of City of Spokane streets, in the City of Spokane, within future US 395 MP 159.49 to MP 161.34, by performing grading, drainage, surfacing, HMA paving, seeding, cement concrete curb and sidewalk, pavement marking, traffic control, and other misc work.B) Our job activities within the project include removing paint line, installing plastic type-c line, installing permanent signing and project barricades, and installing 3-each type-1 bollards.C) 1- The duties required for each job being performed are, for removing the paint line we will use a 40,000 PSI water-blaster mounted on a 2 1/2 ton truck, with a 1-ton pick-up support vehicle.  The water-blaster crew will be paid traffic control striper wages.2- The crew installing the plastic type-c materials, use a manufacturer listed propane torch gun, will be paid in accordance to traffic control striper wages. 3- The permanent signing crew, will hand dig 12 COS Type-A blocks and will core drill existing concrete sidewalks to install 11 COS Type-C sign bases, laborers will be performing this job duty.  4- Laborers will be installing the three Type-1 bollards, we will jack hammer a 1&amp;#39;x 1&amp;#39; hole in the existing asphalt path and concrete in the new bollards.</text_data><comment_date>2017-04-06T00:00:00</comment_date></row><row _id="row-xk56.25wr.mi5p" _uuid="00000000-0000-0000-9266-03978A8AC39E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xk56.25wr.mi5p"><intent_id>1082067</intent_id><project_id>929890</project_id><text_data>**** possibly 2 employees to rake dirt to ready for replacement sod. We aren't really sure we will need employees at this time but will put this in to be safe. Owners will lay sod and use all equipment necessary for this jobSub contractor for re hydroseeding is - washington green hydroseeding inc- 1040 russell road - Mesa Wa 99343</text_data><comment_date>2020-08-25T00:00:00</comment_date></row><row _id="row-zsj5~8gcu-xea5" _uuid="00000000-0000-0000-5285-3E25B0E1E1E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zsj5~8gcu-xea5"><intent_id>1079226</intent_id><project_id>920534</project_id><text_data>Health &amp; Welfare $12.39, Pension $12.89, JATC Apprenticeship $.88, other Bonified Benefits NECA $.52 all  = $26.68</text_data><comment_date>2020-08-20T00:00:00</comment_date></row><row _id="row-tcw9.qekw~g4tt" _uuid="00000000-0000-0000-C3CE-DAA729D62C47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tcw9.qekw~g4tt"><intent_id>744918</intent_id><project_id>783083</project_id><text_data>Job will be at multiple locations. Buckley and Redmond WA.</text_data><comment_date>2016-02-04T00:00:00</comment_date></row><row _id="row-py74_m7hd~kezj" _uuid="00000000-0000-0000-A398-D426F5FF31CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-py74_m7hd~kezj"><intent_id>917317</intent_id><project_id>855680</project_id><text_data>Work performed on wireless access points.</text_data><comment_date>2018-08-01T00:00:00</comment_date></row><row _id="row-f82k-bg7j_8ima" _uuid="00000000-0000-0000-2CE5-54810F8238A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f82k-bg7j_8ima"><intent_id>1003229</intent_id><project_id>885238</project_id><text_data>Source Electric LLC pays fringe benefits to IBEW Local 46 Trust Office. The hourly fringe benefits are: Health &amp; Welfare 9.40/hr, Pension 9.38/hr, 401K 2.00/hr, JATC .68/hr, NEBF 1.63/hr.</text_data><comment_date>2019-08-28T00:00:00</comment_date></row><row _id="row-rja7-i6pj_fimn" _uuid="00000000-0000-0000-EC8D-94F55042C62D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rja7-i6pj_fimn"><intent_id>747650</intent_id><project_id>775159</project_id><text_data>The scope of work for this project is to install cabling for telecommunications and data for desktop computers. All work is performed inside.</text_data><comment_date>2016-02-19T00:00:00</comment_date></row><row _id="row-4fkh~34sw-beyt" _uuid="00000000-0000-0000-2F40-80CFAC8EBD23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4fkh~34sw-beyt"><intent_id>790697</intent_id><project_id>802996</project_id><text_data>009301-006-10</text_data><comment_date>2016-10-18T00:00:00</comment_date></row><row _id="row-prbj~mfqg_sdpj" _uuid="00000000-0000-0000-48F7-BE6877A3C38C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prbj~mfqg_sdpj"><intent_id>492776</intent_id><project_id>678140</project_id><text_data>Installation of new Seeding, plant material bark or wood chip mulch, topsoil, irrigation system</text_data><comment_date>2011-12-09T00:00:00</comment_date></row><row _id="row-efd2_iun7.xdjk" _uuid="00000000-0000-0000-4189-4616599BF0E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efd2_iun7.xdjk"><intent_id>974050</intent_id><project_id>817900</project_id><text_data>Work performed prior to 12/31/2018 was filed under Platinum Scaffolding Services. Work performed 1/1/2019 forward will be filed under Platinum Specialty Services.</text_data><comment_date>2019-04-25T00:00:00</comment_date></row><row _id="row-azue.m3dp.cyw3" _uuid="00000000-0000-0000-A4E8-2FA6EACEC45D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-azue.m3dp.cyw3"><intent_id>1141914</intent_id><project_id>960857</project_id><text_data>WORK FOR KEVIN HUSEMANN @ 141ST</text_data><comment_date>2021-05-04T00:00:00</comment_date></row><row _id="row-paup-bnj5_aa6j" _uuid="00000000-0000-0000-168D-2D3570DD8566" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-paup-bnj5_aa6j"><intent_id>1321678</intent_id><project_id>1064604</project_id><text_data>2203-016P</text_data><comment_date>2023-04-21T00:00:00</comment_date></row><row _id="row-5mub_dr8d-smki" _uuid="00000000-0000-0000-6390-CA41B1306CBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5mub_dr8d-smki"><intent_id>550568</intent_id><project_id>702443</project_id><text_data>All address are locate in the city of Tacoma.1.  Price Joyce    1406 South 14th Street2.  Bardwell Diana    `1412 South L. Street3.  Rossi Carmen    7212 South Warner Street4.  Clark Michael    1013 South Trafton Street5.  Tiffani Tajner    1425 South 52nd Street6.  Choi Eun    1922 East 63rd Street7.  Yolanda Payan    2143 South Alaska Street</text_data><comment_date>2013-01-03T00:00:00</comment_date></row><row _id="row-ty8d-ca6p_y36z" _uuid="00000000-0000-0000-CAFC-5E5B95CC0BE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ty8d-ca6p_y36z"><intent_id>649253</intent_id><project_id>742369</project_id><text_data>Prime Job# 514-3721; Installing new CAT 6 cables for data connections for cameras; inside work.</text_data><comment_date>2014-08-26T00:00:00</comment_date></row><row _id="row-tavt-j678.dhzx" _uuid="00000000-0000-0000-C346-F436F6FBC4C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tavt-j678.dhzx"><intent_id>511688</intent_id><project_id>649288</project_id><text_data>Filed by: Leland Mesford</text_data><comment_date>2012-05-14T00:00:00</comment_date></row><row _id="row-dwf5.pj5z-ai7b" _uuid="00000000-0000-0000-B6DF-5D74296184E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dwf5.pj5z-ai7b"><intent_id>1251726</intent_id><project_id>1023249</project_id><text_data>SRO 1913851</text_data><comment_date>2022-07-25T00:00:00</comment_date></row><row _id="row-qbqt~52ft~7igb" _uuid="00000000-0000-0000-4907-FFD9A3E8774B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbqt~52ft~7igb"><intent_id>535003</intent_id><project_id>681304</project_id><text_data>Work to be performed will be final seeding of lawn areas with a 75hp Bowie hydroseeder.</text_data><comment_date>2012-09-18T00:00:00</comment_date></row><row _id="row-fezr-9ejb_k93d" _uuid="00000000-0000-0000-5A29-F3A8E6024D1B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fezr-9ejb_k93d"><intent_id>701860</intent_id><project_id>763295</project_id><text_data>Fringe breakdown;$18.13--- $5.00 Medical, $1.00 Vacation, $1.00 Holiday, $11.13 Pension$9.82---  $5.00 Medical, $1.00 Vacation, $1.00 Holiday, $2.82  Pension</text_data><comment_date>2015-06-18T00:00:00</comment_date></row><row _id="row-uun8-wqwd-ruzv" _uuid="00000000-0000-0000-3D3B-1405F78144C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uun8-wqwd-ruzv"><intent_id>579328</intent_id><project_id>714825</project_id><text_data>#1 contracted to build 1200 amp service with 35 meter sockets for apartments.#2Apartment building.                 #3  3 story Apartment building#4a no commercial use.#4b no retail in structure.#4c -#4k no to all.#5 yes all apts have kitchens.#6 yes all have seperate bathrooms.#7 no all units are apts.#8 no public use.</text_data><comment_date>2013-07-17T00:00:00</comment_date></row><row _id="row-gq8x_65wk-vs38" _uuid="00000000-0000-0000-11B9-7F31A5456F73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gq8x_65wk-vs38"><intent_id>774119</intent_id><project_id>796720</project_id><text_data>Filed by Patrick O&amp;#39;Donnell</text_data><comment_date>2016-07-12T00:00:00</comment_date></row><row _id="row-aii4~jgg2-qgtr" _uuid="00000000-0000-0000-8C26-531BE002DA37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aii4~jgg2-qgtr"><intent_id>1120109</intent_id><project_id>922806</project_id><text_data>1120094</text_data><comment_date>2021-02-04T00:00:00</comment_date></row><row _id="row-5ti9~nkj7-b6hb" _uuid="00000000-0000-0000-8003-69A6CECA4D53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ti9~nkj7-b6hb"><intent_id>1024327</intent_id><project_id>900767</project_id><text_data>Other Trucks- Tractor with Belly Dump</text_data><comment_date>2019-11-27T00:00:00</comment_date></row><row _id="row-d248_eegm.kczs" _uuid="00000000-0000-0000-1364-961FF8D11E29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d248_eegm.kczs"><intent_id>1105784</intent_id><project_id>929218</project_id><text_data>0820123</text_data><comment_date>2020-11-24T00:00:00</comment_date></row><row _id="row-x5n8-abjx_6y5u" _uuid="00000000-0000-0000-0AD0-77FBF27717BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x5n8-abjx_6y5u"><intent_id>965636</intent_id><project_id>875779</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2019-03-22T00:00:00</comment_date></row><row _id="row-x5n6~ym74~zhvd" _uuid="00000000-0000-0000-6868-DB684443FD2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x5n6~ym74~zhvd"><intent_id>724823</intent_id><project_id>741769</project_id><text_data>INTENT VERBAGE1. TRUCK DRIVER - DRIVING TRUCK MOUNTED HYDROSEEDER AND SKID STEER2. NOZZELMAN - SPRAYING HYDROMULCHING AND OPERATING SKID STEER3. LANDSCAPE LABORER - LOADING SEED, FERTILIZER, MULCH INTO MACHINE BE HAND AND CLEANINGNOTE: ALL FRINGE IS PAID TO DAVIS BACONVESTING:Prevailing wage contribution. If the work you perform for the Employer is subject to prevailing wage laws, then the Employer will make contributions to this Plan to help satisfy the fringe benefit requirements of the law. You will receive this contribution based on work you perform during a Plan Year that is subject to the law. The contribution is 100% vested PARTICIPATION:If you are working under a prevailing wage contract, then for purposes of receiving any prevailing wage contribution made to the Plan, you are eligible to participate on the date your employment is covered under the contract and will enter the Plan on that date, unless the prevailing wage contract provides otherwise.</text_data><comment_date>2015-10-06T00:00:00</comment_date></row><row _id="row-riiq_ekfa.q3gr" _uuid="00000000-0000-0000-ACE5-4C243BD00ACA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-riiq_ekfa.q3gr"><intent_id>1035470</intent_id><project_id>906711</project_id><text_data>Peavey Rd #7, Sedro-Woolley, WA 982841. Air seal, belly blow, mechanical ventilation   2. Single family      3. 1      4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No     5. Yes      6. Yes      7. No      8. No</text_data><comment_date>2020-02-03T00:00:00</comment_date></row><row _id="row-6a5t.md5d_mwqk" _uuid="00000000-0000-0000-A192-B4FC532F0A62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6a5t.md5d_mwqk"><intent_id>1164812</intent_id><project_id>972943</project_id><text_data>Prime Electric Job # 1009056</text_data><comment_date>2021-07-29T00:00:00</comment_date></row><row _id="row-rhz9.ufer.9ekx" _uuid="00000000-0000-0000-3C47-FE7D39AD92CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rhz9.ufer.9ekx"><intent_id>1213905</intent_id><project_id>1001001</project_id><text_data>Have no idea what is the issue with this or why it was rejected can someone contact me at 425-210-6639 to review this? I've tried calling and emailing but don't get any assisstance.</text_data><comment_date>2022-04-06T00:00:00</comment_date></row><row _id="row-33z7_j44m~3tz7" _uuid="00000000-0000-0000-1EED-FD6D81858702" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-33z7_j44m~3tz7"><intent_id>870858</intent_id><project_id>828568</project_id><text_data>Filed by Linnie ShaverExemption Intent Questionnaire form �SMT 26 Printer RelocationPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks you employees performed. Please provide us with the following information:1.	What is the specific purpose of this awarding agency�s public works project? Remodel  existing building2.	Does this project include fabrication, delivery, installation of non-standard item(s) fabricated according to specifications specifically for a public works project? No3.	Does this specific project entail the remodeling or new construction of a facility? Yes, but not performed by Siemens Employees4.	If your firm is working upon a type of building system, what type of system is involved? HVAC/refrigeration control system5.	What specific tasks will your employees perform? Siemens� Bau Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The Bau Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.6.	What, if any, tools will your employees use in the performance of those tasks? Laptop computer.7.	If your employees will use no tools, will they engage in any other type of manual, hands on efforts completing their task? No - none.8.	Are you going to be hiring any subcontractors for this project? YesTo expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you stat that your work is �verification�, �commissioning� or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2017-10-24T00:00:00</comment_date></row><row _id="row-yiw2~qb3q.qtcd" _uuid="00000000-0000-0000-FB7E-F24F29E41BD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yiw2~qb3q.qtcd"><intent_id>902635</intent_id><project_id>838657</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the above crafts/trades/occupations.</text_data><comment_date>2018-05-04T00:00:00</comment_date></row><row _id="row-3mge-pban_fvut" _uuid="00000000-0000-0000-3F10-A1FFEA4163D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3mge-pban_fvut"><intent_id>1024480</intent_id><project_id>900835</project_id><text_data>Other truck =&amp;lt; 8000 gallons used for dust control &amp; compaction</text_data><comment_date>2019-12-02T00:00:00</comment_date></row><row _id="row-utbj_66gq.8f76" _uuid="00000000-0000-0000-FD37-4E797CD21D55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utbj_66gq.8f76"><intent_id>567399</intent_id><project_id>418040</project_id><text_data>Lake Steven Sewer District Contract G &amp; O #04741    425-334-8588Project sponsor:  Virgil Curtis 425-334-2400</text_data><comment_date>2013-05-07T00:00:00</comment_date></row><row _id="row-ggpx_jhit.3k9b" _uuid="00000000-0000-0000-2452-6A6A0884734E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ggpx_jhit.3k9b"><intent_id>484655</intent_id><project_id>673163</project_id><text_data>Beautification of area adjacent to river through the installation of grass.Hydroseeder, hand tools</text_data><comment_date>2011-10-19T00:00:00</comment_date></row><row _id="row-92g5_3vn9~k8ej" _uuid="00000000-0000-0000-8431-476592572E80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-92g5_3vn9~k8ej"><intent_id>1094477</intent_id><project_id>822014</project_id><text_data>Stoneway Concrete is a Supplier</text_data><comment_date>2020-10-08T00:00:00</comment_date></row><row _id="row-i49b_mfe9~qfsz" _uuid="00000000-0000-0000-C2DD-87484567ACE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i49b_mfe9~qfsz"><intent_id>962884</intent_id><project_id>874483</project_id><text_data>MMFS Contract #33879CNT</text_data><comment_date>2019-03-01T00:00:00</comment_date></row><row _id="row-6s3h.wwhp~tpiz" _uuid="00000000-0000-0000-AF5C-E3E0F912061A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6s3h.wwhp~tpiz"><intent_id>879829</intent_id><project_id>835586</project_id><text_data>Elect Tech (06) and telecom tech(09)LAN(Local Area Network)Bits and BytesTelephoneInside work and outside work</text_data><comment_date>2017-12-18T00:00:00</comment_date></row><row _id="row-hydb~9wuh.4cqe" _uuid="00000000-0000-0000-BB34-A567CAD42634" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hydb~9wuh.4cqe"><intent_id>779207</intent_id><project_id>798580</project_id><text_data>Vendor email L&amp;I Intents and Affidavits to: lisa.gacer@seattlecolleges.edu Per City of Seattle Contract #2639RCC Job # S36112 JD/KG</text_data><comment_date>2016-08-02T00:00:00</comment_date></row><row _id="row-w87s_xktf_fqt9" _uuid="00000000-0000-0000-8E3F-0AB2E5A529BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w87s_xktf_fqt9"><intent_id>690334</intent_id><project_id>757549</project_id><text_data>Labor will include tasks such as sweeping, dust control (hose), shoveling, select demo of walls etc.</text_data><comment_date>2015-04-22T00:00:00</comment_date></row><row _id="row-qfyf~74mh~pxru" _uuid="00000000-0000-0000-1025-D285D70BE621" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qfyf~74mh~pxru"><intent_id>1091630</intent_id><project_id>930876</project_id><text_data>Torres &amp; Torres will be working at Thompson Elementary School of the 4 projects that this intent will be covering.</text_data><comment_date>2020-09-28T00:00:00</comment_date></row><row _id="row-uw84~b54w~bvqe" _uuid="00000000-0000-0000-6F1E-98FB9FF06236" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uw84~b54w~bvqe"><intent_id>850770</intent_id><project_id>825064</project_id><text_data>RON RHOADS IS AN OWNER/OPERATORFRINGE BENEFITS ARE PAID IN FULL DIRECTLY TO THE EMPLOYEE.</text_data><comment_date>2017-07-27T00:00:00</comment_date></row><row _id="row-g82c_w6r9-qh5j" _uuid="00000000-0000-0000-430E-9D6C9C0FF765" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g82c_w6r9-qh5j"><intent_id>824488</intent_id><project_id>813175</project_id><text_data>Wages over the prevailing wage are paid directly to the driver.  No fringe benefits offered.</text_data><comment_date>2017-04-04T00:00:00</comment_date></row><row _id="row-tnhv.zz3k-gvaz" _uuid="00000000-0000-0000-73C5-0FC03FAD6FF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tnhv.zz3k-gvaz"><intent_id>703859</intent_id><project_id>766084</project_id><text_data>once a week svc for this location until told otherwise, bad drainfield</text_data><comment_date>2015-06-26T00:00:00</comment_date></row><row _id="row-i8vp-wiia-p6k2" _uuid="00000000-0000-0000-BB6B-3562FAC07970" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i8vp-wiia-p6k2"><intent_id>896354</intent_id><project_id>847360</project_id><text_data>302722</text_data><comment_date>2018-04-03T00:00:00</comment_date></row><row _id="row-if52~4q9g.7skh" _uuid="00000000-0000-0000-F0D7-BF2291F2E283" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-if52~4q9g.7skh"><intent_id>482208</intent_id><project_id>673459</project_id><text_data>Journeyman Plumbers &amp; Pipefitter Fringe benefits: Health &amp; Welfare $8.16 - Vacation $5.50 - WA State Pension $4.56 - Supplemental Pension $3.25 - National Pension Fund 3.23 - JATC - $1.38 - Assessment Check Off $1.05 - Industry Improvement Trust $0.43 - International Training Fund $0.10 - MCAWW Dues $0.10</text_data><comment_date>2011-10-06T00:00:00</comment_date></row><row _id="row-imkw-a7uy_p6gu" _uuid="00000000-0000-0000-B430-971B28564B93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imkw-a7uy_p6gu"><intent_id>835955</intent_id><project_id>820167</project_id><text_data>JOB#1065F-41488</text_data><comment_date>2017-05-24T00:00:00</comment_date></row><row _id="row-zjg8_kuwe_munk" _uuid="00000000-0000-0000-F850-DA4C493C8596" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zjg8_kuwe_munk"><intent_id>785959</intent_id><project_id>801173</project_id><text_data>VPC uses Labor and Industries Prevailing Wage Determination 04272007 in assigning wage bands.  The industrial power vacuum cleaner uses a vacuum cleaner.  The laborer uses a hand tool to remove registers and a rag to wipe them down, plastic sheeting to cover desk.</text_data><comment_date>2016-09-12T00:00:00</comment_date></row><row _id="row-q3g4~fvy3.96gf" _uuid="00000000-0000-0000-2793-2915E45CC578" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q3g4~fvy3.96gf"><intent_id>932025</intent_id><project_id>855951</project_id><text_data>Lakeside job# 0918099TRUCKSlowboy delivers asphalt rotomill to jobsite</text_data><comment_date>2018-09-11T00:00:00</comment_date></row><row _id="row-h6xc_qq9h_8w5y" _uuid="00000000-0000-0000-84CB-A6A92B82534F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h6xc_qq9h_8w5y"><intent_id>903196</intent_id><project_id>846185</project_id><text_data>Perform passive PM with general hand tools and laptop.</text_data><comment_date>2018-05-08T00:00:00</comment_date></row><row _id="row-s8bq~vz2c.zwpf" _uuid="00000000-0000-0000-94FF-D2ECF9CC7280" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s8bq~vz2c.zwpf"><intent_id>1200500</intent_id><project_id>967552</project_id><text_data>25AC5168</text_data><comment_date>2021-12-20T00:00:00</comment_date></row><row _id="row-pbap_iva7.ab5h" _uuid="00000000-0000-0000-F0DC-B0DBE771C962" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbap_iva7.ab5h"><intent_id>1184759</intent_id><project_id>969470</project_id><text_data>Conveyor Truck</text_data><comment_date>2021-10-12T00:00:00</comment_date></row><row _id="row-wrcs.h36j-wr7x" _uuid="00000000-0000-0000-96D1-AE22C133D959" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wrcs.h36j-wr7x"><intent_id>1276574</intent_id><project_id>1036343</project_id><text_data>side dump</text_data><comment_date>2022-11-16T00:00:00</comment_date></row><row _id="row-ge5t-x4hq~kgwd" _uuid="00000000-0000-0000-0873-F832510A8609" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ge5t-x4hq~kgwd"><intent_id>541239</intent_id><project_id>696156</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-29T00:00:00</comment_date></row><row _id="row-nwv5.3d5t.hrrh" _uuid="00000000-0000-0000-98D7-87013EE34F93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nwv5.3d5t.hrrh"><intent_id>971131</intent_id><project_id>828376</project_id><text_data>We are a Tribal Company and Industrial Insurance is not needed.</text_data><comment_date>2019-04-11T00:00:00</comment_date></row><row _id="row-tims_cd63_ndmh" _uuid="00000000-0000-0000-B115-D0F280A778E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tims_cd63_ndmh"><intent_id>743789</intent_id><project_id>773443</project_id><text_data>Johnson Controls Job #5N59-0215</text_data><comment_date>2016-01-27T00:00:00</comment_date></row><row _id="row-hgxb_z2p6_54tw" _uuid="00000000-0000-0000-296A-1694A83A7B54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hgxb_z2p6_54tw"><intent_id>850052</intent_id><project_id>828170</project_id><text_data>Plumbing Invoice ARS008208 for Laurie M Allen @ 116 52nd Ave Yakima.  1.  Replaced water service from house to meter with new ball valve, new 3/4 Millar for irrigation.  In addition we installed a new 50 gallon hot water heater with all new associated parts.  Rebuilt a Kohler toilet.   2.  Single Family.  3.  One level  4. a. No  b. No  c. Yes  d. No  e. No  f. No  g. No  h. No  I. No  j. No  k. No  l. None  5. Yes  6. Yes  7. No  8. No</text_data><comment_date>2017-07-25T00:00:00</comment_date></row><row _id="row-vyur.9qq8-g595" _uuid="00000000-0000-0000-4355-67D8A6595B10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vyur.9qq8-g595"><intent_id>447066</intent_id><project_id>659796</project_id><text_data>I am a sole Proprietorship owner opperator</text_data><comment_date>2011-03-15T00:00:00</comment_date></row><row _id="row-a4kq.365r.x889" _uuid="00000000-0000-0000-C885-1955F3EA82D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a4kq.365r.x889"><intent_id>491597</intent_id><project_id>679197</project_id><text_data>Explanation of $2.71 finge:  Vacation $.18; Holdiay $.25; Medical $1.90; Dental $.38</text_data><comment_date>2011-12-05T00:00:00</comment_date></row><row _id="row-cbru_8ieh.6282" _uuid="00000000-0000-0000-0F80-8F2E9D4F9D13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cbru_8ieh.6282"><intent_id>869407</intent_id><project_id>815384</project_id><text_data>JCI #7N59-0255</text_data><comment_date>2017-10-17T00:00:00</comment_date></row><row _id="row-pikz-xma4-sfp9" _uuid="00000000-0000-0000-62A8-DB1487E85DEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pikz-xma4-sfp9"><intent_id>858824</intent_id><project_id>824628</project_id><text_data>all owner operators</text_data><comment_date>2017-08-28T00:00:00</comment_date></row><row _id="row-9mjp.rnub~6zjr" _uuid="00000000-0000-0000-9809-16F1A82E5A4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9mjp.rnub~6zjr"><intent_id>1124769</intent_id><project_id>951978</project_id><text_data>We are not using any vehicles.  We will be using air movers, dehumidifiers and injectidry drying mats.  No tools will be needed other than a box knife to cut plastic sheeting.. Containment consists of plastic sheeting, zippers and tape.</text_data><comment_date>2021-03-14T00:00:00</comment_date></row><row _id="row-s3gc_6xss-afru" _uuid="00000000-0000-0000-18F3-D35A5E6146CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s3gc_6xss-afru"><intent_id>765037</intent_id><project_id>789245</project_id><text_data>#1)install flooring, #2)no, #3)1, #4a)yes, #4b)no, #4c)no, #4d)no, #4e)no, #4f)no, #4g)no, #4h)no, #4i)no, #4j no#4k)no, #5)no, #6)no, #7)no, #8)yes</text_data><comment_date>2016-05-30T00:00:00</comment_date></row><row _id="row-xj7b~xqxm_3hf5" _uuid="00000000-0000-0000-113F-5FDCF9EB1BD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xj7b~xqxm_3hf5"><intent_id>1227040</intent_id><project_id>854640</project_id><text_data>Landscape Construction scope of work as defined by WAC 296-127-01346 for the beautification of a plot of land includes the following: Installing 6' of topsoil Hydroseeding  All Equipment used for landscape Construction scope is under 90 HP</text_data><comment_date>2022-04-20T00:00:00</comment_date></row><row _id="row-ub26_ikm3_arpz" _uuid="00000000-0000-0000-9D94-C040D64814FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ub26_ikm3_arpz"><intent_id>587114</intent_id><project_id>717546</project_id><text_data>MMFS Bid #R315287/SC130708-0087</text_data><comment_date>2013-08-12T00:00:00</comment_date></row><row _id="row-rai5-jk26-v9be" _uuid="00000000-0000-0000-4C0D-FDF0CF28359B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rai5-jk26-v9be"><intent_id>1126181</intent_id><project_id>952811</project_id><text_data>Project# 02961, Palahnuik, Rebecca, 18617 E Mountain View Dr, Spokane Valley, WA  99027</text_data><comment_date>2021-03-18T00:00:00</comment_date></row><row _id="row-h8wj~dkp2~nmjj" _uuid="00000000-0000-0000-9EBC-55A05A540E7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h8wj~dkp2~nmjj"><intent_id>1234082</intent_id><project_id>963864</project_id><text_data>Stoneway Concrete is a Material Supplier</text_data><comment_date>2022-05-17T00:00:00</comment_date></row><row _id="row-ier2.p376-6wc7" _uuid="00000000-0000-0000-58C4-699EAE602386" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ier2.p376-6wc7"><intent_id>1105640</intent_id><project_id>875211</project_id><text_data>We are a subcontractor for FieldTurf. They have been hired to improve the athletic surfaces at Kellogg Middle School. We are supplying and installing a 25mm E-Layer.</text_data><comment_date>2020-11-24T00:00:00</comment_date></row><row _id="row-qe43-brnr.7mqz" _uuid="00000000-0000-0000-AA64-4185C7EFE375" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qe43-brnr.7mqz"><intent_id>569932</intent_id><project_id>711147</project_id><text_data>INGRED SCOTT 8508 31ST AVE CT S #60LAKEWOOD WA 98499</text_data><comment_date>2013-05-16T00:00:00</comment_date></row><row _id="row-qbrx-yttn.c9rs" _uuid="00000000-0000-0000-D059-BC85717FD716" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbrx-yttn.c9rs"><intent_id>460803</intent_id><project_id>662620</project_id><text_data>ICON Job #210125</text_data><comment_date>2011-06-15T00:00:00</comment_date></row><row _id="row-mbyg.epmj~rsdm" _uuid="00000000-0000-0000-F8A4-EE07A3FB088A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbyg.epmj~rsdm"><intent_id>1222073</intent_id><project_id>1000449</project_id><text_data>General Laborer consists of hand work only (no power tools or equipment) $35.55 base + $8.89 pensionCrane Oiler/Driver is being used for an Oil Distributor. Wage band approach is being utilized per Harvey  Means $39.34 base + $9.84 pensionOther trucks consists of a 0 to 8,000 gallon water truck used to help with dust control and compaction $39.51 base $9.88 pension</text_data><comment_date>2022-03-31T00:00:00</comment_date></row><row _id="row-2tfv_ghc5-9p9x" _uuid="00000000-0000-0000-E1F8-C53FFE674CA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tfv_ghc5-9p9x"><intent_id>1066474</intent_id><project_id>922890</project_id><text_data>Work to be performed as needed when called for service. May have more than 1 plumber at any time.</text_data><comment_date>2020-06-19T00:00:00</comment_date></row><row _id="row-pydz_2eyh_cf6c" _uuid="00000000-0000-0000-7121-C5E8A63F4F50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pydz_2eyh_cf6c"><intent_id>644366</intent_id><project_id>730936</project_id><text_data>Install Cat 6 data cable from the patch panel to data jacks in two new dual portable classrooms.  All work will be performed indoors.  This work will be performed on the telecommunication/data systems.</text_data><comment_date>2014-07-29T00:00:00</comment_date></row><row _id="row-b286-5jjw.wawt" _uuid="00000000-0000-0000-8F06-1B9050424A8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b286-5jjw.wawt"><intent_id>500206</intent_id><project_id>669908</project_id><text_data>Aero is a subtier contractor to Silverstreak Inc.</text_data><comment_date>2012-02-13T00:00:00</comment_date></row><row _id="row-3vvb~9ws3_7inq" _uuid="00000000-0000-0000-E086-1462060C7DA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vvb~9ws3_7inq"><intent_id>1014166</intent_id><project_id>895659</project_id><text_data>Filed by Gary L. MossProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2019-10-09T00:00:00</comment_date></row><row _id="row-35b7.e64e.xra9" _uuid="00000000-0000-0000-41D4-88B2C0B5021E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-35b7.e64e.xra9"><intent_id>1139593</intent_id><project_id>958959</project_id><text_data>Not exactly sure of our start date</text_data><comment_date>2021-04-26T00:00:00</comment_date></row><row _id="row-g282-kbj8~ajyx" _uuid="00000000-0000-0000-39AA-9D4044AE16D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g282-kbj8~ajyx"><intent_id>994501</intent_id><project_id>887056</project_id><text_data>FDC is spreading materials such as doors and cabinets throughout job site. FDC employees do not utilize any tools on site. FDC spreading the materials in order to make the job easier for the installation company/GC.</text_data><comment_date>2019-08-16T00:00:00</comment_date></row><row _id="row-zprz-dyy2_687d" _uuid="00000000-0000-0000-53CC-FEEA86A66488" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zprz-dyy2_687d"><intent_id>631727</intent_id><project_id>735809</project_id><text_data>3842 PC 6</text_data><comment_date>2014-05-28T00:00:00</comment_date></row><row _id="row-w6qv-j9fr-72i9" _uuid="00000000-0000-0000-3F2F-B383FFBCC7DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w6qv-j9fr-72i9"><intent_id>1209677</intent_id><project_id>956929</project_id><text_data>Job #W21002</text_data><comment_date>2022-02-07T00:00:00</comment_date></row><row _id="row-2dzk~4iqs~e58g" _uuid="00000000-0000-0000-7FD0-9645610EFAD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2dzk~4iqs~e58g"><intent_id>907292</intent_id><project_id>851833</project_id><text_data>Jr Green Hill SchoolRemoval of existing Cottonwood sectionsEstimate #18726</text_data><comment_date>2018-05-28T00:00:00</comment_date></row><row _id="row-zpmv~hg3p.wndh" _uuid="00000000-0000-0000-6B5F-0371D18C1F3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zpmv~hg3p.wndh"><intent_id>1259978</intent_id><project_id>897381</project_id><text_data>1522207</text_data><comment_date>2022-08-22T00:00:00</comment_date></row><row _id="row-sg3s~jgg3~d3g3" _uuid="00000000-0000-0000-A903-1A550663A298" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sg3s~jgg3~d3g3"><intent_id>1209060</intent_id><project_id>998046</project_id><text_data>#1 - Emergency electrical repairs; #2 - single family; #3 - usually 1, could have 2; #4 (a) no; (b) no; (c) yes; (d) no; (e) no; (f) no; (g) no; (h) no; (i) no; (j) no; (k) n/a; (l) single family low income housing; #5 - only 1 kitchen; #6 - single family house; #7 - no, single family house; #8 no</text_data><comment_date>2022-02-03T00:00:00</comment_date></row><row _id="row-t9tr~diha_xbq5" _uuid="00000000-0000-0000-14BB-B615805D3707" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9tr~diha_xbq5"><intent_id>1069292</intent_id><project_id>921248</project_id><text_data>We supply aggregate materials for the job and hire dump truck to deliver material</text_data><comment_date>2020-07-08T00:00:00</comment_date></row><row _id="row-6kh6~wkfn~9hhp" _uuid="00000000-0000-0000-AEC4-A1425C8F6D92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6kh6~wkfn~9hhp"><intent_id>1095487</intent_id><project_id>936095</project_id><text_data>Cut Back the Laural Hedges by the Entrance located near A Street using a Hedge Trimmer and nothing else.</text_data><comment_date>2020-10-13T00:00:00</comment_date></row><row _id="row-8hr2_a4i4-m7wy" _uuid="00000000-0000-0000-93E5-9C3143A631D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8hr2_a4i4-m7wy"><intent_id>1069826</intent_id><project_id>921695</project_id><text_data>Installing plants, soil, and irrigation system</text_data><comment_date>2020-07-03T00:00:00</comment_date></row><row _id="row-a68s~8z8i-32vy" _uuid="00000000-0000-0000-F964-71A36298F405" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a68s~8z8i-32vy"><intent_id>1465830</intent_id><project_id>1137325</project_id><text_data>Journeyman Total Fringe ($31.55) = Health &amp; Welfare($12.02), Pension($12.34), Apprenticeship Training($0.95), National Electrical Benefit Fund($2.21), 401K($3.32), Administrative Maintenance Fund($0.55), Labor Management Cooperation Committee($0.10), National Labor-Management Cooperation Committee($0.01), Substance Abuse Program($0.05).</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-feez-2vv4.wvk5" _uuid="00000000-0000-0000-3918-3C3F0483D637" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-feez-2vv4.wvk5"><intent_id>1211955</intent_id><project_id>990959</project_id><text_data>The whole project will consist of roadway and structure excavation. They will be constructing retaining walls, a drainage system and a new pond.Our part of the project will consist of installing compost socks on both sides of the job site. A big variety of plants and tress of varying sizes will be installed through out the whole site. Seeding, fertilizing and mulching will be spread out through out the sight. There will also be fine compost laid out 3' deep, soil amendments will also be laid out 3' deep with bark wood chip mulch 3' deep. There will also be bark wood chip mulch rings installed 3' deep.</text_data><comment_date>2022-02-16T00:00:00</comment_date></row><row _id="row-sbxx.rnne_kyq7" _uuid="00000000-0000-0000-F5AD-B562146171F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sbxx.rnne_kyq7"><intent_id>557404</intent_id><project_id>705506</project_id><text_data>Several manufactured homes within San Souci MHP</text_data><comment_date>2013-02-22T00:00:00</comment_date></row><row _id="row-fdua.ezr4_9e52" _uuid="00000000-0000-0000-DBFF-D7D96450EFE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fdua.ezr4_9e52"><intent_id>658327</intent_id><project_id>736289</project_id><text_data>Form filed by: Bill Houston</text_data><comment_date>2014-10-03T00:00:00</comment_date></row><row _id="row-eykd.syk4~974x" _uuid="00000000-0000-0000-AC40-1DA418BE03D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eykd.syk4~974x"><intent_id>669631</intent_id><project_id>750675</project_id><text_data>Part A Work on this project includes the construction of a trail at the Port of Vancouver, Washington. Work includes site clearing, grading, asphalt paving, block retaining wall, landscaping and irrigation. Part B Keystones work includes; 1) Modifying an existing irrigation system.2) Installing a new irrigation system 24 &amp;quot; maximum depth .3) Grading and seeding 4,965 square yards of lawn area.4) Furnishing and planting 27 ornamental trees.5) Furnishing and planting 1,796 ornamental shrubs.6) Furnishing and placing 17 landscape boulders.7) Furnishing and spreading 590 cy of topsoil in the planting areas 12&amp;quot; deep.8) furnishing and spreading 340 cy of bark mulch 3&amp;quot; deep. Equipment used for this work includes a walk behind trencher, small loader, and small excavator.</text_data><comment_date>2014-12-16T00:00:00</comment_date></row><row _id="row-t98s~y8pq_5vwu" _uuid="00000000-0000-0000-BB77-1A0B896C6015" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t98s~y8pq_5vwu"><intent_id>1219761</intent_id><project_id>1004862</project_id><text_data>sr50270566</text_data><comment_date>2022-03-22T00:00:00</comment_date></row><row _id="row-9gci_x3pw.3wza" _uuid="00000000-0000-0000-976C-FD18128F33DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9gci_x3pw.3wza"><intent_id>1093681</intent_id><project_id>935220</project_id><text_data>WAI job 20745-1</text_data><comment_date>2020-10-06T00:00:00</comment_date></row><row _id="row-w3t9-c7ev.kybk" _uuid="00000000-0000-0000-7B89-0EB8B8F823C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w3t9-c7ev.kybk"><intent_id>681328</intent_id><project_id>719338</project_id><text_data>Form filed by:  Glenn Banning</text_data><comment_date>2015-02-27T00:00:00</comment_date></row><row _id="row-2uzh~9epd_zfxn" _uuid="00000000-0000-0000-FFEA-CF9A2E799D82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2uzh~9epd_zfxn"><intent_id>509549</intent_id><project_id>686696</project_id><text_data>Form filed by: Robert Dean - murq235</text_data><comment_date>2012-04-27T00:00:00</comment_date></row><row _id="row-856f.4r62~say5" _uuid="00000000-0000-0000-BB12-462338FD4AAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-856f.4r62~say5"><intent_id>1322832</intent_id><project_id>1022070</project_id><text_data>JW: NEBF $2.04, H&amp;W $11.00, Pension $11.13, 401K $2.75, JATC $0.91.</text_data><comment_date>2023-04-26T00:00:00</comment_date></row><row _id="row-ybe8_qgmz_bmvd" _uuid="00000000-0000-0000-8716-DED5CDCBC63D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ybe8_qgmz_bmvd"><intent_id>872334</intent_id><project_id>836422</project_id><text_data>Planting trees that are 2&amp;quot; caliper and larger, backfilling with soil and mulching the planting site.</text_data><comment_date>2017-10-31T00:00:00</comment_date></row><row _id="row-j26w.zdmj-aiu9" _uuid="00000000-0000-0000-94C8-59B902182725" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j26w.zdmj-aiu9"><intent_id>965268</intent_id><project_id>870603</project_id><text_data>One of our electricians is an apprentice that will become registered with an apprentice program during the course of this job.  We will be paying journeyman wages to start but once he's registered can we then change his rate of pay?</text_data><comment_date>2019-03-14T00:00:00</comment_date></row><row _id="row-j44i.pn2b.iynw" _uuid="00000000-0000-0000-3867-F97CA3CD3C88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j44i.pn2b.iynw"><intent_id>819239</intent_id><project_id>801217</project_id><text_data>1116141</text_data><comment_date>2017-03-06T00:00:00</comment_date></row><row _id="row-6urx_99wt_vhkq" _uuid="00000000-0000-0000-5F9D-21B5033A9799" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6urx_99wt_vhkq"><intent_id>622562</intent_id><project_id>731995</project_id><text_data>INSTALL EXTERIOR LIGHTS ON PORTABLES ( 114-4115)</text_data><comment_date>2014-03-31T00:00:00</comment_date></row><row _id="row-9z3c.nnyt~8633" _uuid="00000000-0000-0000-B508-A00B47BA6E57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9z3c.nnyt~8633"><intent_id>908960</intent_id><project_id>852498</project_id><text_data>January 17, 2018 Four Artech art handlers loaded (1) empty crate by hand and delivered to KCLS Bellevue via a small box truck and unloaded by hand to the third floor of the library. Following delivery, Artech crew then de-installed (1) artwork mural from third floor wall using basic hand tools and packed artwork into empty crate by hand.   January 23, 2018 Two Artech art handlers relocated packed crate containing a mural artwork to opposite side of 3rd floor at KCLS Bellevue using dollies. Wednesday April 11, 2018  Three Artech art handlers erected by hand, a Gantry system over balcony/rail of third floor and staged for lowering packed crate to second floor. April 12, 2018 Three Artech crew attached and lowered mural artwork secured into empty crate from third floor to second floor using Gantry System. Once lowered, Artech crew installed the mural into pre-fabricated armature already in place. Installation was done by hand and basic hand tools.</text_data><comment_date>2018-06-05T00:00:00</comment_date></row><row _id="row-nv3c-wy3n.k9kh" _uuid="00000000-0000-0000-EFEF-4671A25F34A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nv3c-wy3n.k9kh"><intent_id>941416</intent_id><project_id>859692</project_id><text_data>12 yard End dump truck used for hauling road construction related items ou ok</text_data><comment_date>2018-10-23T00:00:00</comment_date></row><row _id="row-f6yy_45hi.jfss" _uuid="00000000-0000-0000-217A-7575AD0F835C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f6yy_45hi.jfss"><intent_id>448536</intent_id><project_id>663105</project_id><text_data>Industrial Insurance Account Id: 801,993-01</text_data><comment_date>2011-04-05T00:00:00</comment_date></row><row _id="row-e95g_ngf6_afy3" _uuid="00000000-0000-0000-AB6C-9F42F6009E4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e95g_ngf6_afy3"><intent_id>804453</intent_id><project_id>803294</project_id><text_data>1990 GMC w/Tymco 300 attachment for sweeping</text_data><comment_date>2016-11-29T00:00:00</comment_date></row><row _id="row-b8fg.3wvb-kdhp" _uuid="00000000-0000-0000-72E1-36B701ED853C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b8fg.3wvb-kdhp"><intent_id>910146</intent_id><project_id>852970</project_id><text_data>Filed by Linnie Shaver</text_data><comment_date>2018-06-08T00:00:00</comment_date></row><row _id="row-4z3h-7yvk.kwgi" _uuid="00000000-0000-0000-D852-75B0AF2D0986" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4z3h-7yvk.kwgi"><intent_id>573127</intent_id><project_id>709470</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2013-08-06T00:00:00</comment_date></row><row _id="row-9pyt~jxpm.3stm" _uuid="00000000-0000-0000-3454-60EEBB7024A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9pyt~jxpm.3stm"><intent_id>1018626</intent_id><project_id>892637</project_id><text_data>2511 South 59th AvenueYakima, WA 98903</text_data><comment_date>2019-10-30T00:00:00</comment_date></row><row _id="row-ti3f_sc77_8yzu" _uuid="00000000-0000-0000-1C20-A3079A30728B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ti3f_sc77_8yzu"><intent_id>689066</intent_id><project_id>759978</project_id><text_data>Form filed by:  Michael Hummel</text_data><comment_date>2015-04-14T00:00:00</comment_date></row><row _id="row-gzu2.nqjy-vaw7" _uuid="00000000-0000-0000-77A7-8F841C728F8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzu2.nqjy-vaw7"><intent_id>938556</intent_id><project_id>863547</project_id><text_data>Other Trucks include under 50 ton lowboy for equip transport</text_data><comment_date>2018-10-09T00:00:00</comment_date></row><row _id="row-c3iy~8x7t_eqxh" _uuid="00000000-0000-0000-AD20-C8B4926C4CAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c3iy~8x7t_eqxh"><intent_id>730480</intent_id><project_id>776289</project_id><text_data>Install Access Control and Video Surveillance Systems</text_data><comment_date>2015-11-06T00:00:00</comment_date></row><row _id="row-5bfk-xb4h-uqap" _uuid="00000000-0000-0000-DA7D-533312B97D80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bfk-xb4h-uqap"><intent_id>1058038</intent_id><project_id>900131</project_id><text_data>Telecommunications Network Installation including backbone and horizontal cabling of CAT6 cable, Installation and commissioning of Fire Alarm, Security System, Video Surveilance, Intrusion Detection, and Access Control</text_data><comment_date>2020-05-14T00:00:00</comment_date></row><row _id="row-6jsa-bwwp.vjar" _uuid="00000000-0000-0000-78A4-F6E0BC6BEF22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6jsa-bwwp.vjar"><intent_id>1142070</intent_id><project_id>848009</project_id><text_data>We just subcontracted Oldcastle to do the manufacturing of the structure we provided.  No work done onsite.</text_data><comment_date>2021-05-05T00:00:00</comment_date></row><row _id="row-akrb_b9k2_be39" _uuid="00000000-0000-0000-8840-FDA91B344B3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-akrb_b9k2_be39"><intent_id>923989</intent_id><project_id>792683</project_id><text_data>22470</text_data><comment_date>2018-08-08T00:00:00</comment_date></row><row _id="row-5dhb.mib5.vhgk" _uuid="00000000-0000-0000-5063-8E935C54E854" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5dhb.mib5.vhgk"><intent_id>613070</intent_id><project_id>727776</project_id><text_data>26522-1</text_data><comment_date>2014-01-21T00:00:00</comment_date></row><row _id="row-tpes~ebpp_78da" _uuid="00000000-0000-0000-6BE8-597501C8B467" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tpes~ebpp_78da"><intent_id>1245794</intent_id><project_id>1020183</project_id><text_data>Tribal Tax Exempt</text_data><comment_date>2022-08-05T00:00:00</comment_date></row><row _id="row-y3ij-itc4.4am9" _uuid="00000000-0000-0000-C53E-819385AF56A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y3ij-itc4.4am9"><intent_id>975746</intent_id><project_id>878430</project_id><text_data>CWA job# 93743TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2019-05-03T00:00:00</comment_date></row><row _id="row-xutb_ehnz-zc28" _uuid="00000000-0000-0000-1947-D01326DB80CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xutb_ehnz-zc28"><intent_id>886728</intent_id><project_id>838701</project_id><text_data>HIRED BY SUB CASCADE MINI EXCAVATING</text_data><comment_date>2018-02-05T00:00:00</comment_date></row><row _id="row-kbg9-vwjj.rumj" _uuid="00000000-0000-0000-087F-B9B5E9ABEC3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kbg9-vwjj.rumj"><intent_id>740993</intent_id><project_id>782403</project_id><text_data>Other truck is a 4,000 gallon on road water truck used for dust control and compaction</text_data><comment_date>2016-01-11T00:00:00</comment_date></row><row _id="row-fgc3~pp69.2yzv" _uuid="00000000-0000-0000-3287-777E951F9EF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fgc3~pp69.2yzv"><intent_id>683213</intent_id><project_id>757386</project_id><text_data>various dates for work  between 2/2/15-3/4/2015;  Puyallup and Edgewood</text_data><comment_date>2015-03-11T00:00:00</comment_date></row><row _id="row-b329_2f5q.ryjt" _uuid="00000000-0000-0000-DB8F-121162AC299E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b329_2f5q.ryjt"><intent_id>1061161</intent_id><project_id>916297</project_id><text_data>truck other is a non cdl 26K GVW flatbed truck to haul seeder</text_data><comment_date>2020-05-28T00:00:00</comment_date></row><row _id="row-zzwk.evna-7ug6" _uuid="00000000-0000-0000-E0D2-6176CDA3BBEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zzwk.evna-7ug6"><intent_id>998857</intent_id><project_id>889974</project_id><text_data>Specific tasks: End of project: walk through project and remove tube protectors from trees that no longer need them</text_data><comment_date>2019-08-12T00:00:00</comment_date></row><row _id="row-8rvn_rar2~jj7p" _uuid="00000000-0000-0000-38FA-A161F8A5EC5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8rvn_rar2~jj7p"><intent_id>1265197</intent_id><project_id>1012236</project_id><text_data>JCI Project # 650221122 UWMC RR Wing Pediatric Admin - Cheryl Graves, PC - Bradford Adragna, Sales</text_data><comment_date>2022-09-09T00:00:00</comment_date></row><row _id="row-fa29_frmg~v2r3" _uuid="00000000-0000-0000-8656-CCB5591D8750" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fa29_frmg~v2r3"><intent_id>1321700</intent_id><project_id>1064622</project_id><text_data>2203-014P</text_data><comment_date>2023-04-21T00:00:00</comment_date></row><row _id="row-m754-ph3d-yzsp" _uuid="00000000-0000-0000-E87F-3EE770865F1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m754-ph3d-yzsp"><intent_id>1469580</intent_id><project_id>1146566</project_id><text_data>J#300002680</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-xhje~ye7v-jatp" _uuid="00000000-0000-0000-E0D3-AEDDFE768AE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xhje~ye7v-jatp"><intent_id>1469856</intent_id><project_id>1146725</project_id><text_data>J#300086971</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-p8yi.6jcc-fv4q" _uuid="00000000-0000-0000-81D4-3F062A3EC07A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p8yi.6jcc-fv4q"><intent_id>1469622</intent_id><project_id>1146588</project_id><text_data>HM WO 13517</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-y7zp.3gev~bfjs" _uuid="00000000-0000-0000-65D1-0FCF251AF46C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y7zp.3gev~bfjs"><intent_id>1469703</intent_id><project_id>1146638</project_id><text_data>9954056</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-gu6w~w2tm~ytwz" _uuid="00000000-0000-0000-C231-CF53FFC8FAAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gu6w~w2tm~ytwz"><intent_id>1469798</intent_id><project_id>1146693</project_id><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-x3qa~fbde_geey" _uuid="00000000-0000-0000-175B-8D5568BE3FCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3qa~fbde_geey"><intent_id>774297</intent_id><project_id>789612</project_id><text_data>Filed by Linnie ShaverState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- Muir Heat Pump ReplacementPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?  Remodel Mechanical Systems Upgrade2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? NO3.) Does this project entail the remodeling or new construction of a facility? no4.) If your firm is working upon a type of building system, what type of system is involved? HVAC Controls5.) What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.) Are you going to be hiring any subcontractors for this project?Yes.To expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2016-07-12T00:00:00</comment_date></row><row _id="row-waun~thy2-kz3d" _uuid="00000000-0000-0000-1FFB-ECB2926ADD29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-waun~thy2-kz3d"><intent_id>1121151</intent_id><project_id>949906</project_id><comment_date>2021-02-09T00:00:00</comment_date></row><row _id="row-4hqz_j7n3_r2zu" _uuid="00000000-0000-0000-9C31-751DE54CB623" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4hqz_j7n3_r2zu"><intent_id>1059693</intent_id><project_id>905099</project_id><text_data>1.    What is the specific purpose of this awarding agency's public works project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump etc. Reconstruction of Existing entrance.     Does this project include the fabrication, delivery or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) I detail (See WAC 296-127-010 9a)(vi) WAC 296-127-020 (3 NO     Does this specific project entail the remodeling or new construction of a facility? NO     If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling etc. NO     What specific tasks will your employees perform? Twenty Seven and a half visits for Reinforced Concrete Inspection, Compression samples, &amp; transporting samples back to the lab for testing. Contractor will supply samples for testing.         What, if any, tools will your employees use in the performance of those tasks? Nuclear Densometer tools with kit that include a drive pin, drive pin plate, small sledge hammer.     IF your employees will use no tools, they will engage in any other type of manual,hands-on efforts in completing their tasks? No other tools are needed to perform testing services. Any samples collected will be done by contractor and put in our truck for delivery to the lab for testing.     Are you going to be hiring any subcontractors for this project? NO         When is your work to be completed? Planning or preconstruction phase or during the public works project?  June2020</text_data><comment_date>2020-05-21T00:00:00</comment_date></row><row _id="row-uxu2-z2ip-rtpb" _uuid="00000000-0000-0000-FC62-F185D344492F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uxu2-z2ip-rtpb"><intent_id>618128</intent_id><project_id>663725</project_id><text_data>S34004  JD</text_data><comment_date>2014-02-27T00:00:00</comment_date></row><row _id="row-uy6q~nr53~86xx" _uuid="00000000-0000-0000-5733-ED90ACB4C86B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uy6q~nr53~86xx"><intent_id>592602</intent_id><project_id>717371</project_id><text_data>Form Filed By: Tom Ezetta</text_data><comment_date>2013-09-09T00:00:00</comment_date></row><row _id="row-gran_pynv~x4ks" _uuid="00000000-0000-0000-BF15-2EFF19F7E1BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gran_pynv~x4ks"><intent_id>967542</intent_id><project_id>875988</project_id><text_data>HIRING CONTRACTOR: HILDEBRAND CONCRETE CONSTRUCTION INC.</text_data><comment_date>2019-03-26T00:00:00</comment_date></row><row _id="row-d9rd-ihry.ejth" _uuid="00000000-0000-0000-41BF-A73AD4CC65EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d9rd-ihry.ejth"><intent_id>676942</intent_id><project_id>754694</project_id><text_data>Other Truck is a 4,000 gallon on road water truck used for dust control and compaction.</text_data><comment_date>2015-01-28T00:00:00</comment_date></row><row _id="row-usfn~yc9y.m4fe" _uuid="00000000-0000-0000-6268-8274C69E944E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-usfn~yc9y.m4fe"><intent_id>698538</intent_id><project_id>756165</project_id><text_data>Hoffman Structures job #5068014.</text_data><comment_date>2015-06-04T00:00:00</comment_date></row><row _id="row-is2m-fy9r.wde9" _uuid="00000000-0000-0000-CFF3-18BF057BA81D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-is2m-fy9r.wde9"><intent_id>1147965</intent_id><project_id>934083</project_id><text_data>Mann Elementary1002 S 52nd StTacoma, WA 98408-3605Invoice 35001010 and35028186This is not a plumbing problem we are working on the parts inside the dishwasher. It is General Labor. This requires a Technician to go out and repair the dishwasher. You cam not buy these parts from the local store you have to get them from the manufacturer. Small hand tools</text_data><comment_date>2021-05-26T00:00:00</comment_date></row><row _id="row-gfnn_4wwi_u8ts" _uuid="00000000-0000-0000-877A-34EF1EBA8DE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfnn_4wwi_u8ts"><intent_id>513939</intent_id><project_id>688434</project_id><text_data>The address listed in the project site are all single family residences. Each unit has a kitchen and at least one bathroom and is considered a permanent primary residence for all its tenants. The electricians will be replacing lights and conducting knob and tube inspections. This job meets the residential job requirements.</text_data><comment_date>2012-05-29T00:00:00</comment_date></row><row _id="row-q7wh_8wr6.mvdn" _uuid="00000000-0000-0000-328F-A03D603B395D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q7wh_8wr6.mvdn"><intent_id>1089359</intent_id><project_id>933235</project_id><text_data>Other truck = 4000 gallon water truck</text_data><comment_date>2020-09-18T00:00:00</comment_date></row><row _id="row-xpyc.mk6p_39i6" _uuid="00000000-0000-0000-BC99-146D96F8E13B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xpyc.mk6p_39i6"><intent_id>729504</intent_id><project_id>775268</project_id><text_data>1.</text_data><comment_date>2015-11-05T00:00:00</comment_date></row><row _id="row-ej5z_b4in_38ph" _uuid="00000000-0000-0000-D26E-BF3C683B6B68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ej5z_b4in_38ph"><intent_id>803515</intent_id><project_id>807738</project_id><text_data>POE-G4, G5, G6Truck Driver-1900 Gallon Water Truck</text_data><comment_date>2016-11-30T00:00:00</comment_date></row><row _id="row-z44a~yges~yk9j" _uuid="00000000-0000-0000-4C5A-7888E0C44BE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z44a~yges~yk9j"><intent_id>1205208</intent_id><project_id>995601</project_id><text_data>9879852</text_data><comment_date>2022-01-18T00:00:00</comment_date></row><row _id="row-w9qq-ytts-mt8j" _uuid="00000000-0000-0000-F0A7-1726F379CE83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9qq-ytts-mt8j"><intent_id>768087</intent_id><project_id>794358</project_id><text_data>5263 Galbraith Road, Acme</text_data><comment_date>2016-06-14T00:00:00</comment_date></row><row _id="row-2yea-fxzx~g4jj" _uuid="00000000-0000-0000-985A-CDF459ECC8E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2yea-fxzx~g4jj"><intent_id>905778</intent_id><project_id>851192</project_id><text_data>SR# 41663980  INV# 84814998</text_data><comment_date>2018-05-19T00:00:00</comment_date></row><row _id="row-h6n9-4tvw.aceg" _uuid="00000000-0000-0000-BDA3-D61C8B5E93A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h6n9-4tvw.aceg"><intent_id>565041</intent_id><project_id>707293</project_id><text_data>General Laborer will consist of moving the cones, helping the backhoe operator smooth the dirt with a shovel or rake and possibly walking behind the manual compactor.</text_data><comment_date>2013-04-17T00:00:00</comment_date></row><row _id="row-cjub.bnv4.n4rq" _uuid="00000000-0000-0000-622E-BA166EC0BCC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjub.bnv4.n4rq"><intent_id>1229177</intent_id><project_id>1010602</project_id><text_data>9882348</text_data><comment_date>2022-04-27T00:00:00</comment_date></row><row _id="row-7z4a_nwi3~3n9g" _uuid="00000000-0000-0000-06E9-8872506C6F86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7z4a_nwi3~3n9g"><intent_id>1249333</intent_id><project_id>1022051</project_id><text_data>WORK PLAN Signal/ElectricalProvide all labor, materials, and equipment to complete all electrical work per attached documents and inclusive of the following scope of work: City of Everett to provide electrical permit and inspectionsCity of Everett to coordinate with PUD to establish service connectionNorthwest CornerRemove existing pole mounted meter cabinet and flasher cabinetModify existing riser conduit for underground service connection to new 200A service cabinetInstall a new 200A service cabinet provided by the City of Everett (to replace existing pole mounted service)Provide and install cabinet foundation per City of Everett Standard Drawings 803 and 828Provide and install service feeder per the drawings and wiring scheduleCoordinate with PUD for service move and final connection(s)Install 200A main breakerInstall 15A breaker for RRFB signsProvide and install 3� schedule 40 PVC run and riser to existing timber poleProvide and install 2� schedule 40 PVC run to junction box</text_data><comment_date>2022-07-15T00:00:00</comment_date></row><row _id="row-7q7z~wmx4_7534" _uuid="00000000-0000-0000-B86F-2BA680995346" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7q7z~wmx4_7534"><intent_id>1175724</intent_id><project_id>975698</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a thru 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2021-09-08T00:00:00</comment_date></row><row _id="row-2v29~ntrs~pjab" _uuid="00000000-0000-0000-D52C-DC0B70B53308" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2v29~ntrs~pjab"><intent_id>1268601</intent_id><project_id>1032125</project_id><text_data>Jonas W/O # 22-0017090</text_data><comment_date>2022-09-22T00:00:00</comment_date></row><row _id="row-gpke_e6yk~s5bt" _uuid="00000000-0000-0000-CA14-1851E88A8752" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gpke_e6yk~s5bt"><intent_id>1322844</intent_id><project_id>866098</project_id><text_data>JW: NEBF $2.04, H&amp;W $11.00, Pension $11.13, 401K $2.75, JATC $2.75.</text_data><comment_date>2023-04-26T00:00:00</comment_date></row><row _id="row-nhhr_gxsm_tcpp" _uuid="00000000-0000-0000-2DFC-A92B48003E30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nhhr_gxsm_tcpp"><intent_id>1322975</intent_id><project_id>1048656</project_id><text_data>Journeyman: Pension = $14.43  Health = $8.63  Training = $1.7985% Apprentice: Pension = $11.10  Health = $8.63  Training = $1.79</text_data><comment_date>2023-04-26T00:00:00</comment_date></row><row _id="row-j2rc-gt8k-xi48" _uuid="00000000-0000-0000-E74A-5950CC2BA11C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j2rc-gt8k-xi48"><intent_id>957653</intent_id><project_id>871971</project_id><text_data>The scope of work for maintenance services includes :  (This contract is for multiple sites which have different schedules but however the same work is performed, using the same tools.)Turf:Mowing � using regular push mowersTrimming � using a hand held 2 hp weed wackerEdging � using a hand held 2 hp edgerFertilizing � using a walk behind fertilizer spreaderHerbicide application � using back pack sprayer 4 gallonTREES, SHRUBS AND GROUND COVER BEDSWeeding � using hula hoes, a rake to pile up and hand stuffed into a garbage bag.Trimming Ground Cover � trimming/pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage can.Pruning Shrubs - trimming / pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage canPre-emergent Herbicide � hand held spreaderHARD SURFACES	Sweeping � using back pack air blowers Weeds � using back pack sprayer 4 gallonOTHERLeaf Removal � Raked into piles and placed into 30 gallon garbage cans.Litter � Picked up by hand and placed into garbage bags.ANNUAL FLOWER BEDSChange Annual Color � remove existing annual color with shovels, replace with new annual color and cover new material using shovel and rake bed using hand held rakes.Fertilizer � applied using a hand held spreaderGroom Annuals � no tools, hand groomingWeeding - no tools, hand weedingHerbicide � applied using back pack sprayersIRRIGATIONSystem Start-up � small shovel to remove dirt from system.Operate System � no toolsWinterize System � air compressor is used to blow system.All work is hauled off site with a F-350 Ford Truck.</text_data><comment_date>2019-01-29T00:00:00</comment_date></row><row _id="row-tan6_q9pb-sctw" _uuid="00000000-0000-0000-5467-703B4B580969" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tan6_q9pb-sctw"><intent_id>1011853</intent_id><project_id>895115</project_id><text_data>87927 WSU Prosser PO K814053</text_data><comment_date>2019-10-03T00:00:00</comment_date></row><row _id="row-js2c.emhx_7r5i" _uuid="00000000-0000-0000-31BE-025F2AB9BB7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-js2c.emhx_7r5i"><intent_id>886039</intent_id><project_id>840001</project_id><text_data>Filed by Cathy Streleski</text_data><comment_date>2018-01-31T00:00:00</comment_date></row><row _id="row-mxh4.7yi9-d5kp" _uuid="00000000-0000-0000-9C80-E43FE3C4D3DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mxh4.7yi9-d5kp"><intent_id>1158704</intent_id><project_id>904994</project_id><text_data>Other Trucks - Broom/Vacuum Sweeper Truck for jobsite clean up and maintenance.</text_data><comment_date>2021-07-21T00:00:00</comment_date></row><row _id="row-n5ca~wq7p-3uf9" _uuid="00000000-0000-0000-ED22-23F902558F3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n5ca~wq7p-3uf9"><intent_id>586409</intent_id><project_id>717327</project_id><text_data>Customer contract sent to Ramona per request</text_data><comment_date>2013-09-05T00:00:00</comment_date></row><row _id="row-vjsn_2utz-e8av" _uuid="00000000-0000-0000-CF68-6CA557C5C83A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vjsn_2utz-e8av"><intent_id>1253692</intent_id><project_id>1024310</project_id><text_data>Fringe amount $24.69 includes $15.39 (pension), $8.30 (medical), and $1.00 (apprentice program). Fringe amount $17.46 includes $8.72 (pension), $8.20 (medical) and $.54 (apprentice program). Fringe amount $24.29 includes $15.13 (pension), $8.30 (medical), and $0.86 (apprentice program).</text_data><comment_date>2022-07-29T00:00:00</comment_date></row><row _id="row-gvmc~e8kh.fuww" _uuid="00000000-0000-0000-6707-45F7687A02F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gvmc~e8kh.fuww"><intent_id>490090</intent_id><project_id>678569</project_id><text_data>Elena Moya 11219 Cornell Ave S Seattle, WA. 98178</text_data><comment_date>2011-11-18T00:00:00</comment_date></row><row _id="row-jtdt~bact_g2sz" _uuid="00000000-0000-0000-1D3B-D4F1AD6B5044" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jtdt~bact_g2sz"><intent_id>1179254</intent_id><project_id>966911</project_id><text_data>sweeping using a truck mounted sweeper.</text_data><comment_date>2021-09-21T00:00:00</comment_date></row><row _id="row-z4z2~nef8.mzmg" _uuid="00000000-0000-0000-059D-97892427D9DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z4z2~nef8.mzmg"><intent_id>935791</intent_id><project_id>829353</project_id><text_data>SKR hired us</text_data><comment_date>2018-09-26T00:00:00</comment_date></row><row _id="row-gqx9_ni8f~vcxk" _uuid="00000000-0000-0000-8A5A-5A81404585E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqx9_ni8f~vcxk"><intent_id>1163954</intent_id><project_id>972517</project_id><text_data>303491</text_data><comment_date>2021-07-27T00:00:00</comment_date></row><row _id="row-xzbi_8wjh_qq4y" _uuid="00000000-0000-0000-1F64-531083D15A8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xzbi_8wjh_qq4y"><intent_id>603173</intent_id><project_id>716261</project_id><text_data>HIRED BY PRIME</text_data><comment_date>2013-11-05T00:00:00</comment_date></row><row _id="row-ktcv_cc3v~rgdy" _uuid="00000000-0000-0000-B026-E67133D378AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ktcv_cc3v~rgdy"><intent_id>997102</intent_id><project_id>889244</project_id><text_data>order 954526</text_data><comment_date>2019-08-05T00:00:00</comment_date></row><row _id="row-97hh.qd5u-ijfg" _uuid="00000000-0000-0000-AE5A-310FCB471BCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-97hh.qd5u-ijfg"><intent_id>500784</intent_id><project_id>671305</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from job site.</text_data><comment_date>2012-02-16T00:00:00</comment_date></row><row _id="row-25kb_wm3e_2pia" _uuid="00000000-0000-0000-6A05-34AC1C700196" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-25kb_wm3e_2pia"><intent_id>797354</intent_id><project_id>805479</project_id><text_data>The entire job consists of improvements to an existing football field.  We will be excavating the entire site with the large machines, trucks, graders then finish by adding sod, irrigation and plantings, and refinishing the track. Earthwork and preparation for asphalt/concrete will be done with the general labor, pipelayer and equipment rates. At the end we will be adding irrigation, sod and plantings with a bobcat (under 90 hp) and various hand tools using the landscape rates. Asphalt/Concrete work will be done by subcontractors.</text_data><comment_date>2016-10-21T00:00:00</comment_date></row><row _id="row-xhm5~ppri~ybqu" _uuid="00000000-0000-0000-C2F9-211CE3EBAA47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xhm5~ppri~ybqu"><intent_id>1064444</intent_id><project_id>817030</project_id><text_data>Intent 301SNH0446</text_data><comment_date>2020-06-11T00:00:00</comment_date></row><row _id="row-b735_xe8g-jrzg" _uuid="00000000-0000-0000-D5AF-51E21C429603" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b735_xe8g-jrzg"><intent_id>668769</intent_id><project_id>750230</project_id><text_data>Remove three tree stumps from lawn area. Fill in holes with top soil. I will be the operator for project. I will have laborer help with topsoil placement. This project has already ben completed but some how I missed doing paperwork for it. Ray 509-948-8161</text_data><comment_date>2014-12-08T00:00:00</comment_date></row><row _id="row-42q3.7wgy_y24q" _uuid="00000000-0000-0000-6CB8-F6B7B2BC136E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-42q3.7wgy_y24q"><intent_id>840130</intent_id><project_id>824215</project_id><text_data>#1replace a electric furnace. #2yes #3one #4it is a home a=no b=no c=yes d=no e=no f=no g=no h=no I=no j=no k=no l=no #5yes #6yes #7no #8no</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-nueb-akfa_exbu" _uuid="00000000-0000-0000-CD6B-C47C6C704905" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nueb-akfa_exbu"><intent_id>944053</intent_id><project_id>865788</project_id><text_data>MOW LAWNS. BLOW OUT DEBRIS FOR SWALES, RAKE OUT DEAD GRASS AREAS.  SEED AND PEAT MOSS 3,080 SQ. FT. OF LAWN.BLOW PARKING LOT.</text_data><comment_date>2018-11-05T00:00:00</comment_date></row><row _id="row-rfps~8mub_5xyn" _uuid="00000000-0000-0000-BDD9-2519ADF36192" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rfps~8mub_5xyn"><intent_id>1086467</intent_id><project_id>914247</project_id><text_data>Insulation re installation at a fire damaged apartment.Apartment2a - no, b - no, c - yes, d,e,f,g,h,i,j,k,l - no,YesYesyesNo</text_data><comment_date>2020-09-08T00:00:00</comment_date></row><row _id="row-fwh6_xmz4.yu8n" _uuid="00000000-0000-0000-BC39-836E38669C04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fwh6_xmz4.yu8n"><intent_id>729983</intent_id><project_id>769980</project_id><text_data>Install plants, trees, shrubs.  Spread topsoil, mulch or bark to plant beds.  Equipment to be used, misc. small hand tools.</text_data><comment_date>2015-11-04T00:00:00</comment_date></row><row _id="row-3auw~ruma_2m32" _uuid="00000000-0000-0000-C505-0E59AD7BE6BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3auw~ruma_2m32"><intent_id>830873</intent_id><project_id>819878</project_id><text_data>1. Install electric furnace. 2. Single family dwelling (manufactured home). 3. one level. 4. a) no b) no c) yes d)no 3) no f) no g) no h) no I) no j) no k) no l)N/A 5. yes 6. yes 7. yes 8. no</text_data><comment_date>2017-05-07T00:00:00</comment_date></row><row _id="row-jm62-i9zm-jv7t" _uuid="00000000-0000-0000-F5A4-631DBC032E10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jm62-i9zm-jv7t"><intent_id>1114922</intent_id><project_id>946406</project_id><text_data>WAI job 21209-1</text_data><comment_date>2021-01-13T00:00:00</comment_date></row><row _id="row-xwx8-cbj7.z46b" _uuid="00000000-0000-0000-221C-814AB504BC47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xwx8-cbj7.z46b"><intent_id>761719</intent_id><project_id>791823</project_id><text_data>WORK PERFORMED BY THE TELECOMMUNICATION TECHNICIANS IS INSTALLING TELECOMMUNICATIONS CABLING CATEGORY 6 FOR VOICE (TELEPHONE) AND DATA (COMPUTER NETWORKING) INDOORS.</text_data><comment_date>2016-05-12T00:00:00</comment_date></row><row _id="row-m8cf.xez4~msct" _uuid="00000000-0000-0000-1909-634237D6E4D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8cf.xez4~msct"><intent_id>1133015</intent_id><project_id>956614</project_id><text_data>303348</text_data><comment_date>2021-04-01T00:00:00</comment_date></row><row _id="row-mr84~czu2~at7b" _uuid="00000000-0000-0000-2D73-5FCA07B37DC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mr84~czu2~at7b"><intent_id>1125777</intent_id><project_id>952603</project_id><text_data>Contract 3/1/2021-2/28/2022</text_data><comment_date>2021-03-01T00:00:00</comment_date></row><row _id="row-wzh9~rrua_dx3a" _uuid="00000000-0000-0000-7345-D19148985806" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wzh9~rrua_dx3a"><intent_id>962384</intent_id><project_id>874223</project_id><text_data>Work consists of mowing, edging, trimming hedges/shrubs, blowing, planted bed maintenance, fertilizer and herbicide application, removal of waste. Tools used are mowers, trimmers, blowers, edgers, hedge trimmers and hand tools i.e. rakes, shovels, pruners.</text_data><comment_date>2019-02-27T00:00:00</comment_date></row><row _id="row-fxk7~xxkg-8ksp" _uuid="00000000-0000-0000-C621-55B63285BB63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fxk7~xxkg-8ksp"><intent_id>1230453</intent_id><project_id>1011342</project_id><text_data>sr52117060</text_data><comment_date>2022-05-03T00:00:00</comment_date></row><row _id="row-u44r-524b~h36u" _uuid="00000000-0000-0000-4BF7-288FE9A2C810" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u44r-524b~h36u"><intent_id>973651</intent_id><project_id>879344</project_id><text_data>We will mow, edge and blow the areas outlined by the city.  We will be using lawn mowers, weed eaters and blowers.</text_data><comment_date>2019-04-26T00:00:00</comment_date></row><row _id="row-2zvv.74sf-x7zi" _uuid="00000000-0000-0000-A545-43B41924A091" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2zvv.74sf-x7zi"><intent_id>687321</intent_id><project_id>759204</project_id><text_data>1)Install ductless heat pump system 2)single family dwelling 3)one story 4) residence a)no b)no c)yes d)no e)no f)no h)no I)no j)no 5)yes 6)yes 7)no 8)no</text_data><comment_date>2015-04-03T00:00:00</comment_date></row><row _id="row-vuhv~wjyg-x87u" _uuid="00000000-0000-0000-D9AB-9E5DAC3A7E47" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vuhv~wjyg-x87u"><intent_id>550292</intent_id><project_id>702318</project_id><text_data>At this time we have scheduled one worker.  This could change once the job starts</text_data><comment_date>2013-01-02T00:00:00</comment_date></row><row _id="row-8xiw~7t2j_y8jr" _uuid="00000000-0000-0000-4F63-3E18C6E08A7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8xiw~7t2j_y8jr"><intent_id>1157081</intent_id><project_id>969026</project_id><comment_date>2021-06-30T00:00:00</comment_date></row><row _id="row-knjy~xhf3.zjqt" _uuid="00000000-0000-0000-FE27-BE550C6EA701" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knjy~xhf3.zjqt"><intent_id>1033837</intent_id><project_id>905774</project_id><text_data>0608-04 Telephone and/or telephonic equipment - Prewire by contractor: Installation, service, and/or repair. Yakima, Yakima County</text_data><comment_date>2020-01-24T00:00:00</comment_date></row><row _id="row-t3p2_vx7m-44gu" _uuid="00000000-0000-0000-9423-92D6D1C6FC1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3p2_vx7m-44gu"><intent_id>1047621</intent_id><project_id>911223</project_id><text_data>GU Job #20061Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2020-03-25T00:00:00</comment_date></row><row _id="row-xaym~iine.rb4y" _uuid="00000000-0000-0000-8DBF-85E463CE2595" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xaym~iine.rb4y"><intent_id>1129065</intent_id><project_id>870216</project_id><text_data>Truck Drivers will be driving either a 2019 HINO 268A or 2016 HINO 155 flatbed truck. The purpose is to get materials and/or prefabricated materials to the jobsite.</text_data><comment_date>2021-03-16T00:00:00</comment_date></row><row _id="row-p6yq-8axb~vegd" _uuid="00000000-0000-0000-1383-1369EE475C83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p6yq-8axb~vegd"><intent_id>1188137</intent_id><project_id>985139</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2021-11-02T00:00:00</comment_date></row><row _id="row-zt2i~bh4a_5hhe" _uuid="00000000-0000-0000-47C2-44856E2F1FE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zt2i~bh4a_5hhe"><intent_id>847322</intent_id><project_id>825683</project_id><text_data>Truck driver will be driving a 1-ton truck to and from job site to deliver fabricated product.</text_data><comment_date>2017-07-13T00:00:00</comment_date></row><row _id="row-yyqc_kqw7~k525" _uuid="00000000-0000-0000-7946-2FF03E7832E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yyqc_kqw7~k525"><intent_id>944531</intent_id><project_id>865950</project_id><text_data>Note: Workers who perform work on the electrical side of generators (for example, this includes - but is not limited to - load, battery, and transfer tests) must be compensated at the Inside Wireman Electrician/Journey Level (WAC 296-127-01323) prevailing rate of wage for this work. You must specify the nature of the work performed on this generator when filing the Affidavit and keep time records of start/stop times within each classification that are available upon request.</text_data><comment_date>2019-01-20T00:00:00</comment_date></row><row _id="row-3et7_zuvy-46ha" _uuid="00000000-0000-0000-6DB3-09A2A421815A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3et7_zuvy-46ha"><intent_id>1173452</intent_id><project_id>969476</project_id><text_data>Multiple locations with Sweeping/Vacuum Trucks</text_data><comment_date>2021-08-30T00:00:00</comment_date></row><row _id="row-nzqs-6pyt.9tbs" _uuid="00000000-0000-0000-925E-D1673E46D608" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nzqs-6pyt.9tbs"><intent_id>658886</intent_id><project_id>649039</project_id><text_data>Hello, I am not sure where to breakdown the additional fringe details so I shall add it here. This is what the Union requires. I got these numbers from the payroll reporting on Neca's Electronic Payroll Reporting System for AUU.Groundsperson: 16.85 = AMF:$0.15 / HRA:$0.40 $ / JATC:$0.58  / LINECO $6.67  / NEAP $6.87 / NEBF $1.75/ NECA $0.44Line Equipment Operator: $16.56 = AMF:$0.13 / HRA:$0.40 $ / JATC:$0.53  / LINECO $6.67  / NEAP $6.87 / NEBF $1.58/ NECA $0.40Journey Level Lineperson: $16.45 = AMF:$0.13 / HRA:$0.40 $ / JATC:$0.54  / LINECO $5.00  / NEAP $8.35 / NEBF $1.62/ NECA $0.40</text_data><comment_date>2014-10-15T00:00:00</comment_date></row><row _id="row-wutn~52t9.d355" _uuid="00000000-0000-0000-D536-C7FEDAC36FA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wutn~52t9.d355"><intent_id>1016049</intent_id><project_id>874199</project_id><text_data>General labor work consists of hand work (shovel work) no power equipment or power tools.</text_data><comment_date>2019-10-17T00:00:00</comment_date></row><row _id="row-77ji_6tu3.ebm9" _uuid="00000000-0000-0000-C3C2-8F713A21D4FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-77ji_6tu3.ebm9"><intent_id>610594</intent_id><project_id>725786</project_id><text_data>Hooked up heat pump</text_data><comment_date>2014-01-03T00:00:00</comment_date></row><row _id="row-wgng-uq6g-y35k" _uuid="00000000-0000-0000-880D-938CE04FC082" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wgng-uq6g-y35k"><intent_id>979749</intent_id><project_id>881926</project_id><text_data>project is exempt from state prevailing wage requirements based on the housing act of 1937 and 24 cfr 965,101. workers to be paid in accordance to davis bacon wage requirments for soft floor layer</text_data><comment_date>2019-05-22T00:00:00</comment_date></row><row _id="row-7xgn_wy43_qp6w" _uuid="00000000-0000-0000-2130-603F47E3D7F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7xgn_wy43_qp6w"><intent_id>635371</intent_id><project_id>737212</project_id><text_data>#1 - Install (1) Light Pole; #2 - Apt Building; #3 - 3 story; #4 - Apt living a) no; b) no; c) yes; d) no; e) no; f) no; g) no; h) no; i) no; j) yes; #5 - yes; #6 yes; #7 - no; #8 - no</text_data><comment_date>2014-06-16T00:00:00</comment_date></row><row _id="row-cszd-mi3e-ii25" _uuid="00000000-0000-0000-B40E-4AB47FC55406" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cszd-mi3e-ii25"><intent_id>529142</intent_id><project_id>693900</project_id><text_data>There will be no apprentices working with us on this project.</text_data><comment_date>2012-08-17T00:00:00</comment_date></row><row _id="row-dee6-danu-qhcd" _uuid="00000000-0000-0000-F782-9AB6B57DFF43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dee6-danu-qhcd"><intent_id>471140</intent_id><project_id>668446</project_id><text_data>**Answers to Exempt Questions**1.  Purpose of project is to reconfigure and create new HVAC zones for a new vendor store at Compton Union Building.2.  Project consisted of remodeling an existing facility.3.  Siemens systems specialists performed programming and commissioning consisting of verification of proper system and device operation utilizing a laptop computer and visual indication and verification.4.  Laptop computer was used.  No hand tools were used.5.  Employees did not engage in any other type of manual hands on efforts to complete their tasks.</text_data><comment_date>2011-08-11T00:00:00</comment_date></row><row _id="row-f2mz-z83u_9ypn" _uuid="00000000-0000-0000-90F8-D4262EB0BDCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f2mz-z83u_9ypn"><intent_id>882800</intent_id><project_id>771637</project_id><text_data>KEY MECHANICAL CO	LABOR RATES	EFFECTIVE 01/01/16	LOCAL 32		JOURNEYMAN	LOCAL 32	EFFECTIVE 01/01/16		REGBASE WAGE	46.77 VACATION	4.00 ASSESSMENT	1.20   TAXABLE WAGE	51.97 HEALTH &amp; DENTAL	9.01 WASH PENSION	4.56 NATIONAL PENSION	2.49 ITF	0.10 IND IMP TRUST	0.35 JATC	1.63 SUPP PENSION	4.25 LOCAL 32 FRINGES	22.39</text_data><comment_date>2018-01-10T00:00:00</comment_date></row><row _id="row-32xc.wzji-n8h9" _uuid="00000000-0000-0000-2261-E719293D0B3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-32xc.wzji-n8h9"><intent_id>578486</intent_id><project_id>714523</project_id><text_data>Installation of a new replacement telephone system with new wiring.</text_data><comment_date>2013-07-03T00:00:00</comment_date></row><row _id="row-bunt_ikfe~5pmv" _uuid="00000000-0000-0000-A155-000AE23D7F21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bunt_ikfe~5pmv"><intent_id>708751</intent_id><project_id>767879</project_id><text_data>This building is being used in multiple ways. There are counseling businesses and some apartments. We changed out an old boiler with a new high efficient boiler. We used standard mechanical tools that are associated a typical install.</text_data><comment_date>2015-08-05T00:00:00</comment_date></row><row _id="row-kfzb-qhjg-xe3g" _uuid="00000000-0000-0000-68D2-5EC5B183E5D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kfzb-qhjg-xe3g"><intent_id>902558</intent_id><project_id>849909</project_id><text_data>#1-We were contracted to replace the Gas Furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2018-05-03T00:00:00</comment_date></row><row _id="row-5vm3.ukkj.jzx5" _uuid="00000000-0000-0000-0EF9-9773F2445B68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vm3.ukkj.jzx5"><intent_id>1015301</intent_id><project_id>896157</project_id><text_data>1.lead ebatement, windows, siding, insulation 2.SF 3. 4.a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no 5.n/a 6. na 7.na 8. no</text_data><comment_date>2019-10-14T00:00:00</comment_date></row><row _id="row-47xs~47cp.49fg" _uuid="00000000-0000-0000-E539-0016D91DCAFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-47xs~47cp.49fg"><intent_id>792900</intent_id><project_id>803808</project_id><text_data>Lodestone Quarry&amp;#39;s laborer will be connecting the sewer line to the preinstalled pump station</text_data><comment_date>2016-10-04T00:00:00</comment_date></row><row _id="row-guum~6ia9_9pu9" _uuid="00000000-0000-0000-ED6B-3CFFEEE1B140" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-guum~6ia9_9pu9"><intent_id>1053522</intent_id><project_id>916767</project_id><text_data>Renovation of existing playfield. Installation of new turf, sports fixtures, surrounding area.B)Beautification of playfield through the installation of subsurface drainage, irrigation, topsoil and grass.  Mini Excavator &amp;lt;90hp, hydroseeder, dump truck</text_data><comment_date>2020-04-23T00:00:00</comment_date></row><row _id="row-gehr-n98i-kpa8" _uuid="00000000-0000-0000-DA0E-75D8DF403075" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gehr-n98i-kpa8"><intent_id>955968</intent_id><project_id>871150</project_id><text_data>City Hall Remodel</text_data><comment_date>2019-01-18T00:00:00</comment_date></row><row _id="row-6tme.4tcw_m5wx" _uuid="00000000-0000-0000-00D6-BEF6987035A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6tme.4tcw_m5wx"><intent_id>854130</intent_id><project_id>829711</project_id><text_data>Patching:Saw cut out and remove asphalt. Add rock as necessaryPave with 3� class B asphalt. Approximately 2,355 sq ft. Front lot south end to speed bumpCrack Seal: Burn out approx 2220 lin ft in back of schoolFill cracks with rubberized material.</text_data><comment_date>2017-08-10T00:00:00</comment_date></row><row _id="row-bxub-zszs_v82i" _uuid="00000000-0000-0000-5913-E4BEBD5D6D32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bxub-zszs_v82i"><intent_id>1120646</intent_id><project_id>949615</project_id><text_data>Heavy Construction Carpenter Fringes: Vacation $1.00, Health &amp; Security $8.51, Pension $8.60 &amp; Apprentice Fund $0.91 = $19.02General Laborer &amp; Topman Fringes: Health &amp; Security $8.57, Pension $4.25, Apprentice Fund $0.70, National Training $0.05 = $13.57Shovel, Excavator, Backhoes, Tractors 15-30 Fringes: Health &amp; Security $8.57, Pension $13.15, Apprentice Fund $0.70, National Training $0.05 = $22.47</text_data><comment_date>2021-02-05T00:00:00</comment_date></row><row _id="row-tina~5uzp-9pie" _uuid="00000000-0000-0000-5ABC-BC1A486F8C1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tina~5uzp-9pie"><intent_id>712453</intent_id><project_id>737506</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2015-08-05T00:00:00</comment_date></row><row _id="row-2skp.63x2~mh64" _uuid="00000000-0000-0000-EE69-91F541CD5960" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2skp.63x2~mh64"><intent_id>824807</intent_id><project_id>816658</project_id><text_data>GENERAL LABOR WORK CONSISTS OF THE FOLLOWING: 1) HAND WORK (SHOVEL WORK) NO POWER EQUIPMENT OR POWER TOOLS 2) PILOT CAR DRIVER USED FOR MOBILIZING HEAVY EQUIPMENT TO AND FROM THE PROJECT SITE. OTHER TRUCKS CONSIST OF ONE (1) 0-8,000 GALLON WATER TRUCK USED FOR WATERING THE PROJECT SITE FOR COMAPCTION BEFORE PAVING AND/OR DUST CONTROL.</text_data><comment_date>2017-04-05T00:00:00</comment_date></row><row _id="row-2455.uape-ky9x" _uuid="00000000-0000-0000-39BB-8CA5C4029838" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2455.uape-ky9x"><intent_id>752987</intent_id><project_id>787951</project_id><text_data>Filed by Carlos M. Hale</text_data><comment_date>2016-03-23T00:00:00</comment_date></row><row _id="row-p28f~3e8j-y4jv" _uuid="00000000-0000-0000-D6EA-8E64F916F1D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p28f~3e8j-y4jv"><intent_id>1182241</intent_id><project_id>976467</project_id><text_data>Bella Terra will be doing hydroseeding and irrigation for Raptor Excavating. Higher paid employee is an operator and lower paid employee is a laborer.</text_data><comment_date>2021-09-30T00:00:00</comment_date></row><row _id="row-bxd6.2hmd~n2qr" _uuid="00000000-0000-0000-4F4E-BB1DFEAAE5C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bxd6.2hmd~n2qr"><intent_id>1171147</intent_id><project_id>975784</project_id><text_data>W.S.I.P.C. is a landscape maintenance client of Plantscapes. This project is a pruning/trimming request by our client.  We are the only company working on this project.  The client has 300 feet of 6' chain link fence that has tree branches, blackberry bushes and brush poking thru the chain link fence.  We are trimming the foliage back to the fence using pruners and a very small chainsaw, if necessary.</text_data><comment_date>2021-09-01T00:00:00</comment_date></row><row _id="row-tp4d~5pxr_zxn3" _uuid="00000000-0000-0000-CB3D-D94B2B1744E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tp4d~5pxr_zxn3"><intent_id>719432</intent_id><project_id>771875</project_id><text_data>waterline repair project, laborer would cut and remove asphalt, with asphalt saw, cut and remove pipe with cut off saw.</text_data><comment_date>2015-09-21T00:00:00</comment_date></row><row _id="row-w6h6~g9mf-c37b" _uuid="00000000-0000-0000-33E0-EB4F3B220D8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w6h6~g9mf-c37b"><intent_id>729228</intent_id><project_id>773070</project_id><text_data>055100</text_data><comment_date>2015-10-30T00:00:00</comment_date></row><row _id="row-7pw5-rx2r~437k" _uuid="00000000-0000-0000-09D9-7291539DB273" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7pw5-rx2r~437k"><intent_id>672113</intent_id><project_id>740286</project_id><text_data>S34199 P/J</text_data><comment_date>2015-01-05T00:00:00</comment_date></row><row _id="row-g4hj-64u2.8muj" _uuid="00000000-0000-0000-8C96-5481D475B3A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g4hj-64u2.8muj"><intent_id>771805</intent_id><project_id>794167</project_id><text_data>WE DO NOT HAVE ANY EMPLOYEES THAT ARE RESIDENTS OF WA- WORKERS COMP CARRIER- SAIF CORP # 947202</text_data><comment_date>2016-06-29T00:00:00</comment_date></row><row _id="row-n3q5.phte-vyk2" _uuid="00000000-0000-0000-4B4E-D304097A6533" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n3q5.phte-vyk2"><intent_id>1244796</intent_id><project_id>1016266</project_id><text_data>The truck is a 26 foot box truck used to deliver our product for installation.</text_data><comment_date>2022-06-28T00:00:00</comment_date></row><row _id="row-ykai~675i_adp5" _uuid="00000000-0000-0000-C72E-36DC9E84AB6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ykai~675i_adp5"><intent_id>536509</intent_id><project_id>685819</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-02T00:00:00</comment_date></row><row _id="row-8266~5nsx.uqh7" _uuid="00000000-0000-0000-2DAF-2C82E7EA8EA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8266~5nsx.uqh7"><intent_id>732896</intent_id><project_id>760335</project_id><text_data>tractor/trailer to deliver cabinets</text_data><comment_date>2015-11-24T00:00:00</comment_date></row><row _id="row-7iqb.gkvz-x78k" _uuid="00000000-0000-0000-6C40-7D1C3B62AA11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7iqb.gkvz-x78k"><intent_id>979342</intent_id><project_id>881784</project_id><text_data>1.   Repair handrail, repair kitchen plumbing leak2.  Single Family 3. two4. a- no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no5. yes6. yes7. no8. no</text_data><comment_date>2019-05-21T00:00:00</comment_date></row><row _id="row-2hfd_m65c.94jn" _uuid="00000000-0000-0000-A0C8-7EDE9B1471E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2hfd_m65c.94jn"><intent_id>922018</intent_id><project_id>842202</project_id><text_data>Filed by John Lindseth John Lindseth Owner/OperatorCarpet w/ Soft FloorsNo / Employees</text_data><comment_date>2018-07-31T00:00:00</comment_date></row><row _id="row-e893_wdp2.ziw2" _uuid="00000000-0000-0000-6BE4-FF8D2D3187A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e893_wdp2.ziw2"><intent_id>942916</intent_id><project_id>855438</project_id><text_data>181583- Per WAC 296-127-01378 Telecommunications Technicians will be installing cabling for telephones and computers. Terminate, test and label.  Cables will run indoors.</text_data><comment_date>2018-10-30T00:00:00</comment_date></row><row _id="row-ygk8-9vyz~q8sz" _uuid="00000000-0000-0000-296E-807A64FA18E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ygk8-9vyz~q8sz"><intent_id>1149991</intent_id><project_id>965285</project_id><text_data>Invoice #139254191</text_data><comment_date>2021-06-05T00:00:00</comment_date></row><row _id="row-zwbd.tdcn-zqux" _uuid="00000000-0000-0000-BF2D-C2B60C8F9743" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zwbd.tdcn-zqux"><intent_id>699997</intent_id><project_id>764198</project_id><text_data>other truck is a 56K GVW truck with a 3000 gallon tank on back for hydroseedinglandscape truck is for hauling supplies or hauling small hydroseeding tank (less than 90hp)landscape labor is seeding and spreading fertilizer.</text_data><comment_date>2015-06-11T00:00:00</comment_date></row><row _id="row-vbtv_wa3h-tibi" _uuid="00000000-0000-0000-0DC3-0B1FF00688CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vbtv_wa3h-tibi"><intent_id>908327</intent_id><project_id>851425</project_id><text_data>1. Removal of hard scape, excavation for builders and utilities2. Residential Structure3. Garage and 5 Levels above4. Housing and Retail HopeWorks5. a. no, b. yes, c. no d. no, e. yes, f. no, g. no, h. no, I. no, j. no, k. yes I. Housing Hope Project Residential contract6. yes 7. o 8. no</text_data><comment_date>2018-06-01T00:00:00</comment_date></row><row _id="row-32zh.dyin_mr8b" _uuid="00000000-0000-0000-1A9A-F2C9A9C17841" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-32zh.dyin_mr8b"><intent_id>939170</intent_id><project_id>863792</project_id><text_data>WO 5066</text_data><comment_date>2018-10-11T00:00:00</comment_date></row><row _id="row-y7du.6zar.5te5" _uuid="00000000-0000-0000-8FDF-A4C58BB85427" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y7du.6zar.5te5"><intent_id>699682</intent_id><project_id>764476</project_id><text_data>Data Cabling for Computer Systems</text_data><comment_date>2015-06-12T00:00:00</comment_date></row><row _id="row-r9cs~kejq-k6b2" _uuid="00000000-0000-0000-B597-E0E3356297A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9cs~kejq-k6b2"><intent_id>528597</intent_id><project_id>642442</project_id><text_data>***This form is being approved on the basis that the worker(s) listed under General Laborer (WAC 296-127-01344) performed no work as described under the scope of work for Refrigeration Mechanic (WAC 296-127-01367) such as moving, lifting, installing, and cleanup related to the these systems, and that such work was related only to kitchen equipment that did not require installation by Refrigeration Mechanic(s) or other such trades.  If it is later learned that the information you provided for the basis of this approval is not accurate, we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2012-10-22T00:00:00</comment_date></row><row _id="row-arjq-f7jx-9yde" _uuid="00000000-0000-0000-CCB5-3FD1127AAD0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-arjq-f7jx-9yde"><intent_id>1016410</intent_id><project_id>896592</project_id><text_data>One Laborer only.  Cleaning, Helping with scribe molding for side of cabinet</text_data><comment_date>2019-12-02T00:00:00</comment_date></row><row _id="row-gkus-vc4c_mxfr" _uuid="00000000-0000-0000-7D07-9E14C0B0BEAF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gkus-vc4c_mxfr"><intent_id>901320</intent_id><project_id>848012</project_id><text_data>Everything was marked and ready for employee (landscape construction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used</text_data><comment_date>2018-04-27T00:00:00</comment_date></row><row _id="row-86c3_thzy~ydbv" _uuid="00000000-0000-0000-2B9C-6B4C61A7A384" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-86c3_thzy~ydbv"><intent_id>541228</intent_id><project_id>674285</project_id><text_data>Class A - 2 Axle Modular Building Toter Truck, for moving modular buildings.</text_data><comment_date>2012-10-30T00:00:00</comment_date></row><row _id="row-4uf5-gx98-cmpq" _uuid="00000000-0000-0000-904E-23A905742E69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4uf5-gx98-cmpq"><intent_id>565022</intent_id><project_id>706158</project_id><text_data>Job # 9526 related to Job # C12064</text_data><comment_date>2013-04-17T00:00:00</comment_date></row><row _id="row-b5d8_hbs4_bmp6" _uuid="00000000-0000-0000-0EA1-CF32D237164E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b5d8_hbs4_bmp6"><intent_id>449292</intent_id><project_id>662697</project_id><text_data>Industrial Insurance Account Id: 978,096-01</text_data><comment_date>2011-04-08T00:00:00</comment_date></row><row _id="row-hqdm-esqv-z2y3" _uuid="00000000-0000-0000-E094-C6DE9B5A8683" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hqdm-esqv-z2y3"><intent_id>902464</intent_id><project_id>849871</project_id><text_data>1.Weatherize Home2.Single Family Dwelling3.One Level4.a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no l.no5.yes6.yes7.no8.no</text_data><comment_date>2018-05-03T00:00:00</comment_date></row><row _id="row-gr8e-fnjr_9mzk" _uuid="00000000-0000-0000-09AE-C4745C0A272B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gr8e-fnjr_9mzk"><intent_id>607979</intent_id><project_id>725391</project_id><text_data>Decontaminate chemical hoodHazWaste workers to clean chemical hood using sponges, rags and/or small hand tools</text_data><comment_date>2013-12-11T00:00:00</comment_date></row><row _id="row-g6va-5y6z-aqny" _uuid="00000000-0000-0000-DC77-8E4291272975" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g6va-5y6z-aqny"><intent_id>909107</intent_id><project_id>823873</project_id><text_data>PROVIDING HYDROSEEDING ONLY.</text_data><comment_date>2018-06-05T00:00:00</comment_date></row><row _id="row-z3fq.66rj_qp22" _uuid="00000000-0000-0000-BDAD-8FAAD60C1AC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3fq.66rj_qp22"><intent_id>738909</intent_id><project_id>775486</project_id><text_data>From: Kathy Van Court [mailto:Kathy@striperite.com] Sent: Thursday, May 12, 2016 9:49 AMTo: LNI RE Prevailing Wage Worker 1Subject: Davis Bacon Exemption requirementGood morning,I have rec�d instruction from the general contractor( DPK and the King County Housing Authority ) that thebelow verbiage needs to be included in the notes section of our intent #738909 dated 12/22/15. If you could please add this for us.�Project is exempt from state prevailing wage requirements based onThe Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirementsFor the following crafts/trades/occupations.�Thank you,Kathy Van CourtContract Administrator 1813 137th Ave. E.Sumner, WA 98390OFFICE: 253 863-2987FAX: 253 863-3120Kathy@Striperite.comwww.striperite.comThe information in this electronic mail transmission is legally privileged and confidential information intended only for the use of the individual or entity named above.  If you are not the intended recipient, please be advised that any dissemination or copying of this transmission is prohibited; please delete this message and notify us at the numbers listed above.</text_data><comment_date>2016-05-12T00:00:00</comment_date></row><row _id="row-839b~idmy~kfqb" _uuid="00000000-0000-0000-C5A2-BECD5DA2766B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-839b~idmy~kfqb"><intent_id>1219064</intent_id><project_id>1004428</project_id><text_data>INV # 88438520 SR # 51477620</text_data><comment_date>2022-03-18T00:00:00</comment_date></row><row _id="row-n4jj_jbii.g368" _uuid="00000000-0000-0000-D0ED-67DBFCCB93FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n4jj_jbii.g368"><intent_id>1321587</intent_id><project_id>1040585</project_id><text_data>SCI #2212Truck Driver 'Other' is used for truck mounted pick up sweeper and/or 2000-4000 gallon water truck.</text_data><comment_date>2023-04-21T00:00:00</comment_date></row><row _id="row-hesv_5pbt~qbqf" _uuid="00000000-0000-0000-2679-7D2574192B65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hesv_5pbt~qbqf"><intent_id>1321680</intent_id><project_id>1063541</project_id><comment_date>2023-04-21T00:00:00</comment_date></row><row _id="row-gzxc~rzki-7c4x" _uuid="00000000-0000-0000-AFF4-A536934F621E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzxc~rzki-7c4x"><intent_id>1322889</intent_id><project_id>1065131</project_id><text_data>74420-0188</text_data><comment_date>2023-04-26T00:00:00</comment_date></row><row _id="row-usd7_vmmn.vu43" _uuid="00000000-0000-0000-40C9-F1AFB81D24CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-usd7_vmmn.vu43"><intent_id>551266</intent_id><project_id>699895</project_id><text_data>Job # 60644 Related to C10260</text_data><comment_date>2013-01-10T00:00:00</comment_date></row><row _id="row-tpaw~rn4t-cpmh" _uuid="00000000-0000-0000-0E78-80DA7F4AF723" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tpaw~rn4t-cpmh"><intent_id>671195</intent_id><project_id>744679</project_id><text_data>Filed by Ramey Ricks</text_data><comment_date>2014-12-24T00:00:00</comment_date></row><row _id="row-2v6z~y5ci~ugxj" _uuid="00000000-0000-0000-96AB-52A5C5B0F35E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2v6z~y5ci~ugxj"><intent_id>1143611</intent_id><project_id>955214</project_id><text_data>1008452.T/S exhaust fans and controls, replaced shunt trip breaker</text_data><comment_date>2021-05-11T00:00:00</comment_date></row><row _id="row-s9qt~itff_g57j" _uuid="00000000-0000-0000-46AA-ADEC9F7EB0CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s9qt~itff_g57j"><intent_id>656744</intent_id><project_id>741857</project_id><text_data>Owner intends to do the work on this project</text_data><comment_date>2014-09-24T00:00:00</comment_date></row><row _id="row-55b3.2xf7_56bz" _uuid="00000000-0000-0000-C054-BA7789E163B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-55b3.2xf7_56bz"><intent_id>808838</intent_id><project_id>799544</project_id><text_data>Supply and Install PVC Liner and Geotextile Product.Materials: 30 Mil PVC Liner, 10oz Non Woven Geotextile, Anchor Bar w/bolts, welding rod, glueEquipment: Generator, wedges/mice, extrusion welders, air compressor/V-box, Tensiometer, sewing machine, tread, ties, misc. speciality geotextile tool.</text_data><comment_date>2016-12-28T00:00:00</comment_date></row><row _id="row-ekwa.55z4.5azp" _uuid="00000000-0000-0000-B4CC-A6276DBCFCBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ekwa.55z4.5azp"><intent_id>525331</intent_id><project_id>688298</project_id><text_data>This form is being approved on the basis of your statement that your employees will perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.</text_data><comment_date>2012-08-13T00:00:00</comment_date></row><row _id="row-qncf-3nfu_7hi7" _uuid="00000000-0000-0000-4863-7F957CB339AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qncf-3nfu_7hi7"><intent_id>918716</intent_id><project_id>843783</project_id><text_data>699 Union Wage and Fringe</text_data><comment_date>2018-07-17T00:00:00</comment_date></row><row _id="row-xzbx-hzzw.pfjp" _uuid="00000000-0000-0000-7D80-21F009DA4C2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xzbx-hzzw.pfjp"><intent_id>628595</intent_id><project_id>734557</project_id><text_data>1. replace windows2. family dwelling3. one4. residencea) nob) noc) yesd) noe) nof) nog) noh) noi) noj) nok) yes6. yes7. no8. no</text_data><comment_date>2014-05-07T00:00:00</comment_date></row><row _id="row-r6m6_x8by_dhmp" _uuid="00000000-0000-0000-F203-C3350763A416" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r6m6_x8by_dhmp"><intent_id>479498</intent_id><project_id>667139</project_id><text_data>Breakdown of Fringe that equals $7.82: $ 0.48 to NEBF (National Electrical Benefit Fund), $4.20 to H&amp;W (health &amp; welfare), $1.40 to pension, $1.40 to annuity, and $ 0.34 to JATC (Joint Apprenticeship &amp; Training Comm).</text_data><comment_date>2011-10-17T00:00:00</comment_date></row><row _id="row-txkx~57uc-xiq2" _uuid="00000000-0000-0000-C813-CA00C3E9CAB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-txkx~57uc-xiq2"><intent_id>555178</intent_id><project_id>704436</project_id><text_data>Mowing with riders, walk behind mowers and weed whips, pruning with hand tools and shears, spraying lawns and bushes with spray guns and fertilizer speaders, snow plowing with truch and blade and fall cleanup with rakes/tarps.</text_data><comment_date>2013-02-07T00:00:00</comment_date></row><row _id="row-tqtp-d64h_eytr" _uuid="00000000-0000-0000-4161-5F289537EF83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tqtp-d64h_eytr"><intent_id>731954</intent_id><project_id>754156</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2015-11-17T00:00:00</comment_date></row><row _id="row-rdtz.ua69.ncsw" _uuid="00000000-0000-0000-A82D-BAF2F1798E1F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rdtz.ua69.ncsw"><intent_id>703961</intent_id><project_id>766118</project_id><text_data>The full extent of the project was to install bark into the landscape beds.</text_data><comment_date>2015-06-29T00:00:00</comment_date></row><row _id="row-9h8c.uj4y-7cs9" _uuid="00000000-0000-0000-E4C0-3D39D96B6DD3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9h8c.uj4y-7cs9"><intent_id>1281994</intent_id><project_id>1039919</project_id><text_data>Motor Pat Grader to vacuum area of all contaminated liquidsHaz Waste workers to clear all debris using shovel/rakes</text_data><comment_date>2022-11-08T00:00:00</comment_date></row><row _id="row-gmj3_3ngx-355e" _uuid="00000000-0000-0000-2D30-792900A141AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gmj3_3ngx-355e"><intent_id>579531</intent_id><project_id>711613</project_id><text_data>This will replace a previously filed intenet.  I had to hire an employee to complete the work.  I will ask that the old be removed once this one is approved.</text_data><comment_date>2013-07-08T00:00:00</comment_date></row><row _id="row-bye3-rnty.zn4x" _uuid="00000000-0000-0000-2FE9-DAEB58D7680C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bye3-rnty.zn4x"><intent_id>1162952</intent_id><project_id>963205</project_id><text_data>#1 - exterior installation of siding, gutters and down spouts#2- duplexes (5 of them)#3 - 2 stories#4 - a) no, b) no, c) yes, d) no, e) no, f) no, g) no, h) no, i) no, j) no, k) no, l) no#5 - yes#6 - yes#7 - no#8 - no</text_data><comment_date>2021-07-23T00:00:00</comment_date></row><row _id="row-kyp7-2ku7-7ghq" _uuid="00000000-0000-0000-394C-DBE952300E2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kyp7-2ku7-7ghq"><intent_id>1219661</intent_id><project_id>1004784</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-05-03T00:00:00</comment_date></row><row _id="row-fey8~5wv8-miys" _uuid="00000000-0000-0000-E5D8-A5AB68E23781" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fey8~5wv8-miys"><intent_id>1149834</intent_id><project_id>965192</project_id><text_data>The truck driver code is strictly for a passenger truck for travel to and from the job site.</text_data><comment_date>2021-06-04T00:00:00</comment_date></row><row _id="row-nrcz~vwir.pvxt" _uuid="00000000-0000-0000-A0B6-271CA8673275" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrcz~vwir.pvxt"><intent_id>727327</intent_id><project_id>775014</project_id><text_data>City of Bellevue JOC Contract # 1550258-000</text_data><comment_date>2015-10-20T00:00:00</comment_date></row><row _id="row-bra7_zcgy-x92e" _uuid="00000000-0000-0000-9CC1-DF374F5EBC02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bra7_zcgy-x92e"><intent_id>622526</intent_id><project_id>724025</project_id><text_data>Susana Rodriguez  915 N 15th Ave #41</text_data><comment_date>2014-03-30T00:00:00</comment_date></row><row _id="row-wtm4-pn3t~869a" _uuid="00000000-0000-0000-00E0-31F27194327D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wtm4-pn3t~869a"><intent_id>740467</intent_id><project_id>773710</project_id><text_data>Telephone and communications systems will be extended from the existing locations to the new addition. Work is to be performed indoors. Systems include voice and data, camera, and clock speakers.</text_data><comment_date>2016-01-07T00:00:00</comment_date></row><row _id="row-wen2_g8ra-h5kq" _uuid="00000000-0000-0000-024E-41C5F56A2B05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wen2_g8ra-h5kq"><intent_id>1246640</intent_id><project_id>1020658</project_id><text_data>SRO 1917021</text_data><comment_date>2022-07-06T00:00:00</comment_date></row><row _id="row-92dw-dzaw.642g" _uuid="00000000-0000-0000-D2A7-891ABC63C556" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-92dw-dzaw.642g"><intent_id>570606</intent_id><project_id>711431</project_id><text_data>Form filed by: Ronald Jackson</text_data><comment_date>2013-05-20T00:00:00</comment_date></row><row _id="row-5ywp_8c9b_t38k" _uuid="00000000-0000-0000-D630-E16827AF51FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ywp_8c9b_t38k"><intent_id>528544</intent_id><project_id>693340</project_id><text_data>Required fringe paid per Local 66 contract: 6/1/2012NW Sheet Metal Pension  $6.93National Pension  $4.24NW Health Care  $9.28ITI/NEMI/SMOHIT  $.17Apprentice  $ 1.15Industry  $.65Organizational Trust $.85Northwest Supplemental $.79Clean Card  $.02Please let me know if there are any questions. Thank you,</text_data><comment_date>2012-08-15T00:00:00</comment_date></row><row _id="row-az37~puch_fxrr" _uuid="00000000-0000-0000-EBD8-6B39A3E88471" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-az37~puch_fxrr"><intent_id>701745</intent_id><project_id>759468</project_id><text_data>FRINGE RATE:PENSION      9.95H &amp; W        6.77APPR          .65ANNUITY      4.75IMPACT        .29INDUSTRY      .02TOTALFRINGE 22.43</text_data><comment_date>2015-06-18T00:00:00</comment_date></row><row _id="row-dt8h~tu29_8grd" _uuid="00000000-0000-0000-B9B9-42B68B24818D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dt8h~tu29_8grd"><intent_id>625936</intent_id><project_id>733412</project_id><text_data>Form filed by: Don Ritchie</text_data><comment_date>2014-04-22T00:00:00</comment_date></row><row _id="row-mfvb-4x9y-7ik3" _uuid="00000000-0000-0000-DE89-73AD2C3F0825" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mfvb-4x9y-7ik3"><intent_id>1002891</intent_id><project_id>891515</project_id><text_data>Filed by Mark RossProject is exempt from state prevailing wage requirements per the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with HUD Non-Routine Maintenance Wage Rates.</text_data><comment_date>2019-08-27T00:00:00</comment_date></row><row _id="row-4xak-henc_9ji2" _uuid="00000000-0000-0000-2ECB-554DC8180B8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4xak-henc_9ji2"><intent_id>1040475</intent_id><project_id>909570</project_id><text_data>FILED BY BILL MARTIN</text_data><comment_date>2020-02-24T00:00:00</comment_date></row><row _id="row-c286.u7vx~4f39" _uuid="00000000-0000-0000-5CE5-F23C81705C2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c286.u7vx~4f39"><intent_id>658119</intent_id><project_id>745737</project_id><text_data>Other Truck is Water Truck, 2/4000 gallons</text_data><comment_date>2014-10-02T00:00:00</comment_date></row><row _id="row-9qv5.3z3z.fnt4" _uuid="00000000-0000-0000-6E73-6B1314A75889" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9qv5.3z3z.fnt4"><intent_id>652682</intent_id><project_id>741526</project_id><text_data>BRIAR GROUP INC. WILL BE PROVIDING HYDROSEEDING SERVICES ONLY.</text_data><comment_date>2014-09-05T00:00:00</comment_date></row><row _id="row-3mjk-b7ir~apdh" _uuid="00000000-0000-0000-1F35-3E417C51BD1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3mjk-b7ir~apdh"><intent_id>633403</intent_id><project_id>735555</project_id><text_data>The Sheet Metal portion of this job is 10% or less of our total contract. All Sheet metal work will be don by Peter Alexandrovich who is a 50% owner and therefore exempt from prevailing wage rate for this project.</text_data><comment_date>2014-06-05T00:00:00</comment_date></row><row _id="row-8yuz_eenr.kjbp" _uuid="00000000-0000-0000-E305-3C9F56251151" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yuz_eenr.kjbp"><intent_id>1089618</intent_id><project_id>932604</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Weatherization on low-income homes. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? single Family #3 - Including any basement or garage, how many stories or levels does the structure have?generally 1 level #4 - What is the building used for? Residential --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no (b) Any retail use in the structure? no (c) Permanent residence only? yes (d) Rehabilitation house?no (e) Transitional housing? no (f) Communal dining facility? no (g) Treatment services? no (h) Assisted living services? no (I) Dormitories?no (j) Counseling? no (k) Is each room and/or bed in the structure rented separately?n/a (l) Other? n/a #5 - Does each dwelling unit have its own self-contained kitchen? yes #6 - Does each dwelling unit have its own bathroom? yes #7 - Is there a community facility or manager�s office on site? no #8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2020-10-19T00:00:00</comment_date></row><row _id="row-wkzb-m68f~f55q" _uuid="00000000-0000-0000-2DF1-AEC5C0186407" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wkzb-m68f~f55q"><intent_id>446909</intent_id><project_id>662367</project_id><text_data>968,928-01 Industrial Insurance Acct # - looe235</text_data><comment_date>2011-03-26T00:00:00</comment_date></row><row _id="row-rpkn_czwk_egct" _uuid="00000000-0000-0000-68CB-80F794B659AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rpkn_czwk_egct"><intent_id>901529</intent_id><project_id>842284</project_id><text_data>Hired by sub Interwest Construction</text_data><comment_date>2018-04-30T00:00:00</comment_date></row><row _id="row-59zj.gnpk_n4pr" _uuid="00000000-0000-0000-CC5C-7E5CC9B43D8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-59zj.gnpk_n4pr"><intent_id>898592</intent_id><project_id>848320</project_id><text_data>Install closet materials and cat6 cabling for new closet infrastructure. All inside work for network and phone communications.</text_data><comment_date>2018-04-13T00:00:00</comment_date></row><row _id="row-ynms~446r~z8ik" _uuid="00000000-0000-0000-F3B0-4B01F7AAACD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ynms~446r~z8ik"><intent_id>733637</intent_id><project_id>777821</project_id><text_data>1)We were contracted to repair the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-vajg.gf3y_xuxb" _uuid="00000000-0000-0000-26C5-22F4458D783B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vajg.gf3y_xuxb"><intent_id>792955</intent_id><project_id>803829</project_id><text_data>The installation of the cured in place liner doesn&amp;#39;t require any excavation to access the existing sewer line so all work is conducted through existing manholes</text_data><comment_date>2016-10-03T00:00:00</comment_date></row><row _id="row-e7hz_9nxn-2d27" _uuid="00000000-0000-0000-7233-8F0B557BD97C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e7hz_9nxn-2d27"><intent_id>1052236</intent_id><project_id>783637</project_id><text_data>$8.07 Health; $12.40 Pension; $.70 Training; $.02 302 Dues; $.30 302 U P; $.05 FED PAC</text_data><comment_date>2020-05-22T00:00:00</comment_date></row><row _id="row-aq9h.s6fm_vqwg" _uuid="00000000-0000-0000-0CAB-2974E174E1A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aq9h.s6fm_vqwg"><intent_id>615000</intent_id><project_id>728584</project_id><text_data>1. Insulation2. Apartment3. 24. Dwellings A. No B. No C. No D. No E. No F. No G. No H. No I. No J. No K. No 5. Yes 6. Yes7. Yes8. No</text_data><comment_date>2014-02-04T00:00:00</comment_date></row><row _id="row-eyym-ihcx~w4td" _uuid="00000000-0000-0000-E738-28413D223573" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eyym-ihcx~w4td"><intent_id>769494</intent_id><project_id>793067</project_id><text_data>Filed by Travis Matthews</text_data><comment_date>2016-06-20T00:00:00</comment_date></row><row _id="row-h3g5-gq3u~66hj" _uuid="00000000-0000-0000-3972-FD46BB7491A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h3g5-gq3u~66hj"><intent_id>854250</intent_id><project_id>829747</project_id><text_data>1517221</text_data><comment_date>2017-08-11T00:00:00</comment_date></row><row _id="row-9eax-ipfk-d2fc" _uuid="00000000-0000-0000-F7E1-6034D62DDC3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9eax-ipfk-d2fc"><intent_id>508456</intent_id><project_id>684943</project_id><text_data>TRUCK DRIVER OTHER USED FOR TRUCK MOUNTED PICKUP SWEEPER</text_data><comment_date>2012-04-19T00:00:00</comment_date></row><row _id="row-5zt7~a2um_hqg4" _uuid="00000000-0000-0000-93F1-84D97EBB326E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5zt7~a2um_hqg4"><intent_id>932180</intent_id><project_id>649039</project_id><text_data>Trucking; Hauling of materials.</text_data><comment_date>2018-09-12T00:00:00</comment_date></row><row _id="row-wy5j_3mmd~jdqq" _uuid="00000000-0000-0000-EF3C-7BFADC013F15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wy5j_3mmd~jdqq"><intent_id>813948</intent_id><project_id>792153</project_id><text_data>We have workers comp insurance with liberty mutual in Oregon</text_data><comment_date>2017-02-01T00:00:00</comment_date></row><row _id="row-znhn~9at8-58yb" _uuid="00000000-0000-0000-D2E8-2F9386745DF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-znhn~9at8-58yb"><intent_id>935270</intent_id><project_id>848226</project_id><text_data>Pumped lift station for repairs</text_data><comment_date>2018-09-25T00:00:00</comment_date></row><row _id="row-gw55~kdii.82fq" _uuid="00000000-0000-0000-DCB3-06EE1C8A2B2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gw55~kdii.82fq"><intent_id>1286340</intent_id><project_id>1042547</project_id><comment_date>2022-11-29T00:00:00</comment_date></row><row _id="row-x5mg-vmdy_728s" _uuid="00000000-0000-0000-5385-0832FCEB8027" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x5mg-vmdy_728s"><intent_id>1254864</intent_id><project_id>1024942</project_id><text_data>0608-04 Telephone and/or telephonic equipment - Prewire by contractor: Installation, service, and/or repair. Installation of Indoor Telecommunications Cabling - Voice &amp; Data Transmissions. Ellensburg, WA.</text_data><comment_date>2022-08-03T00:00:00</comment_date></row><row _id="row-us52-qxiu-8aqy" _uuid="00000000-0000-0000-6171-703C2C2F8145" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-us52-qxiu-8aqy"><intent_id>918532</intent_id><project_id>856084</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY /// OTHER TRUCKS INCLUDES USE OF A RUMBLE STRIP CUTTING TRUCK AND  A POWER OPERATED SWEEPER</text_data><comment_date>2018-07-17T00:00:00</comment_date></row><row _id="row-yq2a_mvbu_y4ye" _uuid="00000000-0000-0000-E93E-5D85D7FCE2F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yq2a_mvbu_y4ye"><intent_id>826026</intent_id><project_id>817871</project_id><text_data>Entire project consists of landscape maintenance.  Tasks include mowing, line trimming, vegetation cutting, clean up of landscape, litter control, bed work.  Equipment used, walk behind mower, garden tractor with brush cutter, pick up truck, landscape trailer, landscape equipment trailer, weed eater, blower, misc. hand tools.</text_data><comment_date>2017-04-11T00:00:00</comment_date></row><row _id="row-j644.n989_i2hs" _uuid="00000000-0000-0000-EEDC-CB68788E6B37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j644.n989_i2hs"><intent_id>956333</intent_id><project_id>871331</project_id><text_data>#20330, Gadd, Michael, 17420 E 4th, Spokane Valley</text_data><comment_date>2019-02-13T00:00:00</comment_date></row><row _id="row-sp6u-kywt.hdcj" _uuid="00000000-0000-0000-185D-A6F2F4AD3B62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sp6u-kywt.hdcj"><intent_id>908770</intent_id><project_id>852425</project_id><text_data>This contract is for ongoing month to month lawn maintenance.  Mow lawns using 12&amp;quot; walk behind lawnmower and a 36&amp;quot; walk behind lawnmower.  Prune shrubs using hand shears.  Pull weeds by hand.  Blow off hard surfaces with backpack blower.</text_data><comment_date>2018-06-04T00:00:00</comment_date></row><row _id="row-z7sa_gexi_qhai" _uuid="00000000-0000-0000-8FBB-259426F49435" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7sa_gexi_qhai"><intent_id>804218</intent_id><project_id>795932</project_id><text_data>SUB CONTRACTOR WILL BE --DOOLITTLE CONSTRUCTION WILL BE DUMP TRUCKING FOR GARY REED&amp;#39;S EXCAVATING &amp; TRUCKING                     --- KARDIA INC.    WILL BE DUMP TRUCKING FOR  GARY REED&amp;#39;S EXCAVATING &amp; TRUCKING</text_data><comment_date>2016-12-09T00:00:00</comment_date></row><row _id="row-vkhz-48v5_cy6b" _uuid="00000000-0000-0000-C381-06D361936A40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkhz-48v5_cy6b"><intent_id>761638</intent_id><project_id>788553</project_id><text_data>Supply Pathway chips</text_data><comment_date>2016-05-11T00:00:00</comment_date></row><row _id="row-jti9-svp9-3ynh" _uuid="00000000-0000-0000-30F9-A1C987EA9748" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jti9-svp9-3ynh"><intent_id>1132890</intent_id><project_id>956547</project_id><text_data>WRS Job # P21-103PW6</text_data><comment_date>2021-03-31T00:00:00</comment_date></row><row _id="row-atcs-enfk-jvac" _uuid="00000000-0000-0000-2958-88E6BEB85C7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-atcs-enfk-jvac"><intent_id>768231</intent_id><project_id>792650</project_id><text_data>Dynamic Sports Construction,Inc. has multiple company locations one of which is in Oregon. We will utilize the reciprocal agreement with Oregon.</text_data><comment_date>2016-06-14T00:00:00</comment_date></row><row _id="row-updk.zqsb.9g6x" _uuid="00000000-0000-0000-F348-13E5BE8A5338" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-updk.zqsb.9g6x"><intent_id>1153878</intent_id><project_id>854736</project_id><text_data>Per your agency's direction, I am answering the following 9 questions to show that Shannon &amp; Wilson employees are not applicable to prevailing wages.They are degreed engineers who are providing professional services.1) Specific purpose of project: perform professonal services to observe data on a computer screen, analyze the data using specalized software and render a professional opinion. 2) The project does not include the fabrication, delivery, or installation of a non-standard item fabricated according to specs specifically for a public works project.3) Project does not entail the remodeling or new construction of a facility.4) We are not working on a type of building system.5) Our employees provide calculations, consulting, ananlysis, testing, reporting and other design services.6) Our tools include computers and hand held field testing equipment.7) Employees will review the digital data obrained from field testing.8) We will be hiring sub-contractors. .9. When is your work to be completed? Planning or preconstruction phase or during the public works project? - During the public works project.</text_data><comment_date>2021-06-18T00:00:00</comment_date></row><row _id="row-ysjp-x5j5.vvjh" _uuid="00000000-0000-0000-F7E3-DEEC5A0BFAB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ysjp-x5j5.vvjh"><intent_id>576254</intent_id><project_id>712254</project_id><text_data>From: Allan Cail [mailto:allan@elevationsltd.com] Sent: Thursday, June 20, 2013 1:42 PMTo: Pettit, Su Anne (LNI)Subject: RE: Intent 576254 ~ Spokane Public Library ProjectHi SuAnne,Information from National Elevator Industy Benefit Plan.The breakdown is as follows for the $25.52:0.60                         Employer Education7.46                        Employer Pension11.87                      Employer Health0.30                        Emp Work Preservation5.25                        Employer Annuity0.0350                   Employee Health (rounded to .036)Please call if you have any additional questions.Thank You,Mary DanielsElevations,LTD.253 225 5779Allan CailElevations LTD4304 40th Ave. NWGig Harbor, WA 98335T: (253) 468-6917F: (253) 851-6974</text_data><comment_date>2013-06-20T00:00:00</comment_date></row><row _id="row-mypz_drmd.mxuf" _uuid="00000000-0000-0000-9F1A-2D52382D2CC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mypz_drmd.mxuf"><intent_id>693542</intent_id><project_id>761857</project_id><text_data>The fire vault is located at the southeast corner of the building, and it has no other purpose than to house the fire sprinkler valve.</text_data><comment_date>2015-06-04T00:00:00</comment_date></row><row _id="row-n755.gyan~ju97" _uuid="00000000-0000-0000-6D68-71BB931384FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n755.gyan~ju97"><intent_id>763024</intent_id><project_id>792358</project_id><text_data>Job # 8011512</text_data><comment_date>2016-05-19T00:00:00</comment_date></row><row _id="row-frn6~3tc3_5hdx" _uuid="00000000-0000-0000-E178-FE8E9A151E07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-frn6~3tc3_5hdx"><intent_id>1014190</intent_id><project_id>895669</project_id><text_data>Chain ArborChain</text_data><comment_date>2019-10-09T00:00:00</comment_date></row><row _id="row-v3m8_xcyi_gaqz" _uuid="00000000-0000-0000-BF35-B862A7DC8EFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3m8_xcyi_gaqz"><intent_id>1189775</intent_id><project_id>986051</project_id><text_data>Called out to pump the septic tank behind the building. Septic lids were exposed prior to arrival. Pulled septic lids and did not notice a problem in tank that would be causing a backup issue. John instructed me to pump tank anyways for maintenance. The inlet baffle is missing, informed John the inlet baffle should be replaced. Will create an estimate. Pumped 1000 gallon two compartment septic tank. The system appears to be operating normally. There is a fair amount of sand and dirt on the primary side of the tank that we are unable to pump. John is aware that should be cleaned by Iron Horse eventually. The drain line for the kennels is holding water, recommended a Hydro Jetter and John approved. Ran Hydro Jetter line from the kennel trough to the clean-out. Camera inspected to 76 feet to chase a giant hairball. The line is open and flowing good. No guarantee due to the amount hair and debris that goes down the line.</text_data><comment_date>2021-10-29T00:00:00</comment_date></row><row _id="row-kuv9-cncb.v9ti" _uuid="00000000-0000-0000-A2C6-F6ECEEA05102" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kuv9-cncb.v9ti"><intent_id>504987</intent_id><project_id>683637</project_id><text_data>Other Trucks may possibly be water trucks.</text_data><comment_date>2012-03-29T00:00:00</comment_date></row><row _id="row-a9tt.d4z3-7mbb" _uuid="00000000-0000-0000-0128-1513CB99B14A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a9tt.d4z3-7mbb"><intent_id>930148</intent_id><project_id>850131</project_id><text_data>Tymco 600 on international or freightliner chassis</text_data><comment_date>2018-08-31T00:00:00</comment_date></row><row _id="row-4exa~a5i8_bku6" _uuid="00000000-0000-0000-0A85-32618E7CC96F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4exa~a5i8_bku6"><intent_id>583323</intent_id><project_id>712734</project_id><text_data>Fringe Breakdown:$17.69---$5.00 Medical, $1.00 Vacation, $1.00 Medical, $10.69 Pension$10.90---$5.00 Medical, $1.00 Vacation, $1.00 Medical, $3.90 Pension</text_data><comment_date>2013-07-25T00:00:00</comment_date></row><row _id="row-d7fh_jcrg-bup2" _uuid="00000000-0000-0000-1DFF-73EC2E6A78CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7fh_jcrg-bup2"><intent_id>767159</intent_id><project_id>792378</project_id><text_data>The work on this job will vary. Some of the work is strictly tree trim from the ground and will be for beautification of the landscape. Other work done will</text_data><comment_date>2016-06-08T00:00:00</comment_date></row><row _id="row-9zha-4p3g.msaw" _uuid="00000000-0000-0000-030E-B970F722E554" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9zha-4p3g.msaw"><intent_id>1022828</intent_id><project_id>900061</project_id><text_data>1 - REMOVE HOME HEATING OIL TANK2 - SINGLE FAMILY DWELLING3 - 2 STORY4 - A. NO; B. NO C. YES D. NO E. F. NO G. NO H. NO I. NO J. NO K. NO 5 - EACH HOME: YES6 - EACH HOME: YES7 - NO8 - NO</text_data><comment_date>2019-11-20T00:00:00</comment_date></row><row _id="row-2yvw.ewag.vjkw" _uuid="00000000-0000-0000-AE5F-4C5E66BD8B68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2yvw.ewag.vjkw"><intent_id>86825</intent_id><project_id>161693</project_id><text_data>This Intent goes to Affidavit 157542 - this Affidavit was done back when the system allowed Affidavits to be submitted without being tied to an Intent.</text_data><comment_date>2012-06-26T00:00:00</comment_date></row><row _id="row-xcyw_9r5t.uy9m" _uuid="00000000-0000-0000-236D-F4C743EA8F78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xcyw_9r5t.uy9m"><intent_id>1095009</intent_id><project_id>920882</project_id><text_data>Oregon Employees Only - SAIF</text_data><comment_date>2020-10-12T00:00:00</comment_date></row><row _id="row-hzck-qmg9-9fg6" _uuid="00000000-0000-0000-04BE-F2AE36EAA4EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hzck-qmg9-9fg6"><intent_id>930388</intent_id><project_id>763409</project_id><text_data>Installation of (24) Cat6 data cables for security camera locations</text_data><comment_date>2018-09-04T00:00:00</comment_date></row><row _id="row-wigs.vk96.7k9c" _uuid="00000000-0000-0000-D9E0-D8CFFACE8C0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wigs.vk96.7k9c"><intent_id>1262165</intent_id><project_id>1023703</project_id><text_data>WO 7279</text_data><comment_date>2022-08-29T00:00:00</comment_date></row><row _id="row-n4gv_dgiv_7htv" _uuid="00000000-0000-0000-4C15-475766DD271E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n4gv_dgiv_7htv"><intent_id>792904</intent_id><project_id>803812</project_id><text_data>2622 Superior St</text_data><comment_date>2016-09-29T00:00:00</comment_date></row><row _id="row-gvsx_zp2b~ke69" _uuid="00000000-0000-0000-8142-2F5D264F44D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gvsx_zp2b~ke69"><intent_id>529804</intent_id><project_id>685589</project_id><text_data>We are a supplier only, and will not be working at the jobsite.</text_data><comment_date>2012-08-21T00:00:00</comment_date></row><row _id="row-2aja~qega-x2kk" _uuid="00000000-0000-0000-2C8D-26B4F92C6105" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2aja~qega-x2kk"><intent_id>1096466</intent_id><project_id>936552</project_id><text_data>WRI Job # 20.041</text_data><comment_date>2020-10-16T00:00:00</comment_date></row><row _id="row-utvi~pfwi-c7cb" _uuid="00000000-0000-0000-0147-4918C9936D73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utvi~pfwi-c7cb"><intent_id>627272</intent_id><project_id>733973</project_id><text_data>All address are locate in the city of Tacoma.1. Gerald/Nancy Traversie   943 South Sheridan Ave2. Jody Gropp    5815 South 19th Street3. Kuch Sem   6958 East I Street4. Dejonte Patterson   4328 South K. Street</text_data><comment_date>2014-04-29T00:00:00</comment_date></row><row _id="row-fq9a_gn8m-63j9" _uuid="00000000-0000-0000-646A-57A2F4A8725F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fq9a_gn8m-63j9"><intent_id>920825</intent_id><project_id>848009</project_id><text_data>water Truck    sweeper Truck</text_data><comment_date>2018-07-25T00:00:00</comment_date></row><row _id="row-vscc.aab3.9v4r" _uuid="00000000-0000-0000-0C41-D30BAE10DAE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vscc.aab3.9v4r"><intent_id>999222</intent_id><project_id>890121</project_id><text_data>Truck Drivers, Other Trucks - Transport material &amp; personnel</text_data><comment_date>2019-08-13T00:00:00</comment_date></row><row _id="row-333b_a6ys~yu9g" _uuid="00000000-0000-0000-F7EF-17D55C7C1815" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-333b_a6ys~yu9g"><intent_id>1172399</intent_id><project_id>976675</project_id><text_data>Carpenters Fringe Benefits are $8.51/Health &amp; Security, $8.60/Pension &amp; $.91 Apprentice Fund</text_data><comment_date>2021-08-25T00:00:00</comment_date></row><row _id="row-jq27.8ggd_7v6e" _uuid="00000000-0000-0000-495C-A50477963085" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jq27.8ggd_7v6e"><intent_id>971995</intent_id><project_id>878607</project_id><text_data>1. Repairs to residential structures.2. Yes3. 14. A-No, B-No, C-Yes, D-No, E-No, F-No, G-No, H-No, I-No, J-No, K-No, I-No5. Yes6. Yes7. No8.No</text_data><comment_date>2019-04-16T00:00:00</comment_date></row><row _id="row-pvs5-2y6f_3zuj" _uuid="00000000-0000-0000-B4D2-2BD243898E91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pvs5-2y6f_3zuj"><intent_id>1237630</intent_id><project_id>1006037</project_id><comment_date>2022-05-31T00:00:00</comment_date></row><row _id="row-ndpg-3zv5_h32i" _uuid="00000000-0000-0000-95F4-9634FF78C361" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ndpg-3zv5_h32i"><intent_id>455226</intent_id><project_id>665831</project_id><text_data>Idaho Contractor with extra territorial Worker's Comp coverage from Idaho</text_data><comment_date>2011-05-11T00:00:00</comment_date></row><row _id="row-j466~hy3c~s5ex" _uuid="00000000-0000-0000-B2A8-43EB0F92BE32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j466~hy3c~s5ex"><intent_id>482985</intent_id><project_id>627684</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2011-10-11T00:00:00</comment_date></row><row _id="row-jnzp~drg9.shsf" _uuid="00000000-0000-0000-28CB-88C914641D5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jnzp~drg9.shsf"><intent_id>526295</intent_id><project_id>686253</project_id><text_data>Temporary Help Staffing.  Not required to register as state licensed subcontractor.</text_data><comment_date>2012-08-03T00:00:00</comment_date></row><row _id="row-qv3n_zfu2.huz2" _uuid="00000000-0000-0000-7B79-AE7745FE9466" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qv3n_zfu2.huz2"><intent_id>1082772</intent_id><project_id>875550</project_id><text_data>We are an Idaho-based subcontractor. Our Idaho WC policy covers our Idaho-based employees when they work in WA.</text_data><comment_date>2020-08-24T00:00:00</comment_date></row><row _id="row-se6n.8v9z.fvm4" _uuid="00000000-0000-0000-04DC-C3987C359790" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-se6n.8v9z.fvm4"><intent_id>774195</intent_id><project_id>796749</project_id><text_data>1) Install ductless heat pump 2) yes 3) 2 or less 4a)no 4b) no 4c) yes 4d-k) no 5) yes 6) yes 7)no 8) no</text_data><comment_date>2016-07-12T00:00:00</comment_date></row><row _id="row-cyxg~4gcc-ki7q" _uuid="00000000-0000-0000-1622-CC4926789712" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cyxg~4gcc-ki7q"><intent_id>763788</intent_id><project_id>792683</project_id><text_data>Staff work under multiple classifications (as listed above) Telecommunication work is conducted at the treatment facility, with system work being conducted on door access, treatment system alarms, and</text_data><comment_date>2016-05-23T00:00:00</comment_date></row><row _id="row-bhbt_d6u4~8ham" _uuid="00000000-0000-0000-F47F-4BBC37B72A1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bhbt_d6u4~8ham"><intent_id>624645</intent_id><project_id>724859</project_id><text_data>&amp;quot;Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis � Bacon wage requirements for the above craft/trades/occupations&amp;quot;</text_data><comment_date>2014-05-08T00:00:00</comment_date></row><row _id="row-5cxr-f62d~wuyp" _uuid="00000000-0000-0000-E823-C0ABC8C82EE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5cxr-f62d~wuyp"><intent_id>953471</intent_id><project_id>868678</project_id><text_data>Trinity job# 201864TRUCKSlowboy delivers asphalt rotomill to jobsitesweeper driven to jobsite</text_data><comment_date>2019-01-04T00:00:00</comment_date></row><row _id="row-j5fi.byhx_5v9b" _uuid="00000000-0000-0000-59D0-CF358F70C326" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j5fi.byhx_5v9b"><intent_id>636292</intent_id><project_id>737540</project_id><text_data>Roofers will be removing the old roof and Carpenters will be installing the new.</text_data><comment_date>2014-07-08T00:00:00</comment_date></row><row _id="row-m5b2.eupx-ftsx" _uuid="00000000-0000-0000-6F95-8321639460D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m5b2.eupx-ftsx"><intent_id>619359</intent_id><project_id>727902</project_id><text_data>Form filed by: Amarjit Deol</text_data><comment_date>2014-03-10T00:00:00</comment_date></row><row _id="row-xbb3-nm4a.29br" _uuid="00000000-0000-0000-49C4-9835E45E33CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xbb3-nm4a.29br"><intent_id>1082849</intent_id><project_id>929724</project_id><text_data>'Project is exempt from state prevailing wage requirements per the Housing Act of 1937and 24 CFR 965.101. Workers will be paid in accordance with HUD NonroutineMaintenance wage requirements for the following crafts/trades/occupations:'</text_data><comment_date>2020-08-25T00:00:00</comment_date></row><row _id="row-chyn-tfji~shqt" _uuid="00000000-0000-0000-141E-35CFC1418B3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-chyn-tfji~shqt"><intent_id>697800</intent_id><project_id>756344</project_id><text_data>Gabriela Solorzano3451 Desmarias RdMoxee WA 98936</text_data><comment_date>2015-06-02T00:00:00</comment_date></row><row _id="row-xwcj-q3wi_u9e8" _uuid="00000000-0000-0000-FF4B-172CF97B1DD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xwcj-q3wi_u9e8"><intent_id>899231</intent_id><project_id>848583</project_id><text_data>#1) Install a 3-zone Ductless heat pump system#2) Single Family Dwelling#3)2 Stories #4A)No#4B)NO#4C)YES#4D)NO#4E)No#4F)NO#4G)NO#4H)NO#4I)NO#4J)NO#4K)NO#5)N/A#6)N/A#7)NO#8)NO</text_data><comment_date>2018-04-18T00:00:00</comment_date></row><row _id="row-s7it~6vdj~wnrz" _uuid="00000000-0000-0000-6552-9B09B6F4A25B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s7it~6vdj~wnrz"><intent_id>638955</intent_id><project_id>722614</project_id><text_data>Filed by Kirby Morgan.</text_data><comment_date>2014-07-03T00:00:00</comment_date></row><row _id="row-xecy.2zvx_xkcq" _uuid="00000000-0000-0000-1176-568FBE96DC22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xecy.2zvx_xkcq"><intent_id>593003</intent_id><project_id>712599</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2013-09-11T00:00:00</comment_date></row><row _id="row-tytw-2idk_g7r6" _uuid="00000000-0000-0000-237C-7AE76E34FCE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tytw-2idk_g7r6"><intent_id>1085685</intent_id><project_id>918355</project_id><text_data>2004-2736</text_data><comment_date>2020-09-03T00:00:00</comment_date></row><row _id="row-yx4n-9qdc_r2nf" _uuid="00000000-0000-0000-77BF-BEBDAA9ECBD3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yx4n-9qdc_r2nf"><intent_id>640211</intent_id><project_id>737585</project_id><text_data>1. Continuous gutter and downspout installation 2. Nine (9) building campus3. Buildings are three (3) stories, 3 of the buildings have open garage/carport features.4. A No, B. No, C Yes, apartment leases, D No, E No, F No, G No, H No, I No, J No, K. N/A5.Yes6.Yes 7. Yes8. No</text_data><comment_date>2014-07-10T00:00:00</comment_date></row><row _id="row-ge9g~vrvs.pnj5" _uuid="00000000-0000-0000-8E6F-34A8CC8EC854" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ge9g~vrvs.pnj5"><intent_id>1440060</intent_id><project_id>1131535</project_id><text_data>Project# 05094, Hanson Sr, Richard, 2311 W 16th Ave, Lot 246, Spokane, WA 99224</text_data><comment_date>2024-07-10T00:00:00</comment_date></row><row _id="row-za8g_ne8j.qje7" _uuid="00000000-0000-0000-3056-F860F4CBC74B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-za8g_ne8j.qje7"><intent_id>803993</intent_id><project_id>796143</project_id><text_data>update panel and heater</text_data><comment_date>2016-11-22T00:00:00</comment_date></row><row _id="row-fpzt_7pbu_c82f" _uuid="00000000-0000-0000-AD1F-4A8984F26725" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fpzt_7pbu_c82f"><intent_id>1230005</intent_id><project_id>1011085</project_id><text_data>Blythe WO 220117</text_data><comment_date>2022-05-01T00:00:00</comment_date></row><row _id="row-z7f7-cfrx_4eqz" _uuid="00000000-0000-0000-C7CE-2D5C83CA7FE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7f7-cfrx_4eqz"><intent_id>1121356</intent_id><project_id>950013</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.</text_data><comment_date>2021-02-17T00:00:00</comment_date></row><row _id="row-gske-ncf2~55k6" _uuid="00000000-0000-0000-73AA-2B022E1D7ECC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gske-ncf2~55k6"><intent_id>771787</intent_id><project_id>788749</project_id><text_data>HIRED BY SUB TIKKA MASONRY</text_data><comment_date>2016-06-29T00:00:00</comment_date></row><row _id="row-zwx3_r2uh-mmsr" _uuid="00000000-0000-0000-63DD-3CDB4190A79E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zwx3_r2uh-mmsr"><intent_id>993663</intent_id><project_id>883902</project_id><text_data>31109-1 Tukwila Elementary &amp; 31110-1 Cascade View Elementary</text_data><comment_date>2019-07-22T00:00:00</comment_date></row><row _id="row-a8at.xj8s.sa2d" _uuid="00000000-0000-0000-3515-7435CC824AF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a8at.xj8s.sa2d"><intent_id>1039057</intent_id><project_id>908708</project_id><text_data>0720016</text_data><comment_date>2020-02-18T00:00:00</comment_date></row><row _id="row-e6n9_z3mw_v3x3" _uuid="00000000-0000-0000-3937-8572B7DE4B30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e6n9_z3mw_v3x3"><intent_id>495316</intent_id><project_id>680697</project_id><text_data>apply vinyl copy to sign</text_data><comment_date>2012-01-05T00:00:00</comment_date></row><row _id="row-s36z-39uz~ii8y" _uuid="00000000-0000-0000-A1E2-4B251986D216" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s36z-39uz~ii8y"><intent_id>523099</intent_id><project_id>691109</project_id><text_data>Gomez 4442 Reese Hill Rd 98295</text_data><comment_date>2012-07-18T00:00:00</comment_date></row><row _id="row-khpg_bq2t-2bcj" _uuid="00000000-0000-0000-13F8-CF5095C62A18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-khpg_bq2t-2bcj"><intent_id>819627</intent_id><project_id>815120</project_id><text_data>Basic landscape maintenance, mowing, trimming of grass, shrubs,ground covers includes bed care raking, weeding and mulching. Equipment will be commercial quality landscaper hand tools, power blowers, mowers and trimmersyear 2 of contract</text_data><comment_date>2017-03-08T00:00:00</comment_date></row><row _id="row-7csf_paed~m746" _uuid="00000000-0000-0000-974B-7C8D0B656028" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7csf_paed~m746"><intent_id>1223290</intent_id><project_id>1007040</project_id><text_data>Unit priced contract, not to exceed $6000.00</text_data><comment_date>2022-04-05T00:00:00</comment_date></row><row _id="row-4ebr-g2vm.56s8" _uuid="00000000-0000-0000-F511-30F123A4965A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ebr-g2vm.56s8"><intent_id>837105</intent_id><project_id>822982</project_id><text_data>1.  Insulation, windows, mechanical ventilation, drywall, air sealing, Paint2.  Residential Structure3.  14. Residentiala. Nob. Noc. Yesd. no e. Nof. No g. Noh. NoI. Noj. Nok. NoL. No5. Yes6. Yes7. No8. No</text_data><comment_date>2017-05-30T00:00:00</comment_date></row><row _id="row-v8j9_avbe-6mci" _uuid="00000000-0000-0000-06E7-12417C49514A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8j9_avbe-6mci"><intent_id>1118984</intent_id><project_id>940574</project_id><text_data>Miles job# 20151TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2021-01-29T00:00:00</comment_date></row><row _id="row-tq2u_tg6d-2ee5" _uuid="00000000-0000-0000-A978-3AA194E37A2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tq2u_tg6d-2ee5"><intent_id>734982</intent_id><project_id>776435</project_id><text_data>The owner will work on project.</text_data><comment_date>2015-12-03T00:00:00</comment_date></row><row _id="row-vjtn.vtpn~6dth" _uuid="00000000-0000-0000-DD19-0559F6756D03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vjtn.vtpn~6dth"><intent_id>1322875</intent_id><project_id>1065281</project_id><text_data>2023 Inside FM Electrician - Wage $63.09; District 9 $5.54; Edison Pension $9.75; NEBF $1.89; Health &amp; Welfare $10.25; Flex $1.40; Apprenticeship $.80; BLMCC $.20 (total fringe $29.83) Total $92.92</text_data><comment_date>2023-04-26T00:00:00</comment_date></row><row _id="row-28up_gb6w-ycve" _uuid="00000000-0000-0000-8922-3A0BCC9B9364" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-28up_gb6w-ycve"><intent_id>1193375</intent_id><project_id>976342</project_id><text_data>WRI Job# 21.049</text_data><comment_date>2021-11-15T00:00:00</comment_date></row><row _id="row-zxcz~h5x3~bd86" _uuid="00000000-0000-0000-16EA-EB1F8612FCD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxcz~h5x3~bd86"><intent_id>474979</intent_id><project_id>671847</project_id><text_data>Install underground Irrigation in park, Laterials 12&amp;quot; dept and mainline 18&amp;quot; max pipe size 2&amp;quot;. Install 4&amp;quot; depth of topsoil and 2&amp;quot; bark mulch and final lawn seeding in new park.</text_data><comment_date>2011-09-19T00:00:00</comment_date></row><row _id="row-kdyp_33rf-7rxf" _uuid="00000000-0000-0000-E769-306685A65FFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kdyp_33rf-7rxf"><intent_id>777600</intent_id><project_id>758006</project_id><text_data>Installation of rooftop fall protection system.</text_data><comment_date>2016-07-26T00:00:00</comment_date></row><row _id="row-vak7.6yry.348n" _uuid="00000000-0000-0000-5B8C-B80EED7C5C78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vak7.6yry.348n"><intent_id>822721</intent_id><project_id>815481</project_id><text_data>This job includes installation of portable classroom units at 3 different schools. Freeman Bell&amp;#39;s work includes earthwork, site grading, subgrade preparation, sewer, water &amp; storm utilities.  For this project we will also be performing the topsoil preparation at 6&amp;quot; deep and installation of new sod on top.  For all 3 schools combined, there is approximately 10,400 SF of sod to install.  Freeman Bell is planning on using the Landscape Construction Labor classification for the sod placement &amp; maintenance only.  All other activities will be paid per Laborers or Operators classification.</text_data><comment_date>2017-03-24T00:00:00</comment_date></row><row _id="row-9y8e-rvxy.bw4u" _uuid="00000000-0000-0000-2C95-3A425DD420FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9y8e-rvxy.bw4u"><intent_id>450115</intent_id><project_id>656377</project_id><text_data>The General Contractor on this project requires the Intent to be filed upon receipt of contract. Atlas' practice is also to submit intents upon receipt of a contract so they do not get missed.</text_data><comment_date>2011-04-14T00:00:00</comment_date></row><row _id="row-hizw~fcen~kdpi" _uuid="00000000-0000-0000-86D2-E03F94E36110" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hizw~fcen~kdpi"><intent_id>1100937</intent_id><project_id>851347</project_id><text_data>project # 55778 - seattle</text_data><comment_date>2020-11-04T00:00:00</comment_date></row><row _id="row-n2bx~gutq.qqu7" _uuid="00000000-0000-0000-0262-056BDC4BE55D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2bx~gutq.qqu7"><intent_id>1163615</intent_id><project_id>972371</project_id><text_data>Project - 110284 - Seattle/Everett</text_data><comment_date>2021-07-26T00:00:00</comment_date></row><row _id="row-n53f~gq9n.t9b8" _uuid="00000000-0000-0000-4EA2-7D840A727C19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n53f~gq9n.t9b8"><intent_id>1022914</intent_id><project_id>900109</project_id><text_data>Craig is awesome!!!</text_data><comment_date>2019-11-20T00:00:00</comment_date></row><row _id="row-j9ws~wiqj~jkfm" _uuid="00000000-0000-0000-F74D-314C9DB86A2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j9ws~wiqj~jkfm"><intent_id>712249</intent_id><project_id>768740</project_id><text_data>151784-Provide and install Cat6 cabling to be used data (computer) and speakers. Provide pathway where needed. All cables will run to the nearest MDF or IDF for termination. Cables will run indoors. Terminate, test and label.</text_data><comment_date>2015-08-05T00:00:00</comment_date></row><row _id="row-i86m_wa2v~vquq" _uuid="00000000-0000-0000-3A83-ED319564E2B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i86m_wa2v~vquq"><intent_id>689601</intent_id><project_id>760187</project_id><text_data>Gen. Laborer: hand shovels, hand workOther Trucks: Lowboy</text_data><comment_date>2015-04-17T00:00:00</comment_date></row><row _id="row-cbzi~cz6d_mh46" _uuid="00000000-0000-0000-E61D-4D968171298B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cbzi~cz6d_mh46"><intent_id>1175307</intent_id><project_id>944726</project_id><text_data>semi trucks hauling concrete girders</text_data><comment_date>2021-09-07T00:00:00</comment_date></row><row _id="row-d2g5_6xdk-22gg" _uuid="00000000-0000-0000-8A25-A2EAAC1E01AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d2g5_6xdk-22gg"><intent_id>635299</intent_id><project_id>735527</project_id><text_data>Klen &amp; Associates has Workmen's Comp Coverage through The Hartford, policy #52 WEC HO9602</text_data><comment_date>2014-06-16T00:00:00</comment_date></row><row _id="row-7pxj~zkhv~d3zy" _uuid="00000000-0000-0000-B981-1D1061580B71" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7pxj~zkhv~d3zy"><intent_id>588939</intent_id><project_id>711525</project_id><text_data>Filed by Trent Reed</text_data><comment_date>2013-08-21T00:00:00</comment_date></row><row _id="row-5kv4_85gx.wikh" _uuid="00000000-0000-0000-11FE-0A32630155FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5kv4_85gx.wikh"><intent_id>505767</intent_id><project_id>685081</project_id><text_data>Form filed by: Bryon Weese - murq235</text_data><comment_date>2012-03-29T00:00:00</comment_date></row><row _id="row-kimk-74wj-m5t3" _uuid="00000000-0000-0000-EA02-6B2479207B0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kimk-74wj-m5t3"><intent_id>1140886</intent_id><project_id>960319</project_id><text_data>#1 - Rodent control and insulation removal. #2 - Single family dwelling#3 - 1 story#4 - Residential living (a)no (b) no (c) yes (d) no (e) no (f) no (g) no (h) no (I) no (j) no (k)no (l) Other? #5 - no #6 - no #7 - no #8 - no</text_data><comment_date>2021-04-29T00:00:00</comment_date></row><row _id="row-3jwe_tdtq.qpzy" _uuid="00000000-0000-0000-E203-E491AA83B8D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3jwe_tdtq.qpzy"><intent_id>478560</intent_id><project_id>674589</project_id><text_data>DE Job #10520</text_data><comment_date>2011-09-16T00:00:00</comment_date></row><row _id="row-jfjz.e8cm_sa34" _uuid="00000000-0000-0000-D34E-3CA5AB90751B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jfjz.e8cm_sa34"><intent_id>516766</intent_id><project_id>689546</project_id><text_data>General Laborers will perform and assist Carpenters with clean up, demolition, etc.</text_data><comment_date>2012-06-18T00:00:00</comment_date></row><row _id="row-tsyp_berr-k358" _uuid="00000000-0000-0000-DE72-73AB6324C983" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsyp_berr-k358"><intent_id>1003899</intent_id><project_id>891936</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborers Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2019-08-30T00:00:00</comment_date></row><row _id="row-hg45.ixpe_v5a8" _uuid="00000000-0000-0000-3CB0-AB8B49811C92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hg45.ixpe_v5a8"><intent_id>1322628</intent_id><project_id>1065125</project_id><text_data>Ticket #141457</text_data><comment_date>2023-04-26T00:00:00</comment_date></row><row _id="row-nzpx_68cb~hxsb" _uuid="00000000-0000-0000-B861-5135BEFB94EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nzpx_68cb~hxsb"><intent_id>1322854</intent_id><project_id>1065268</project_id><text_data>9917924</text_data><comment_date>2023-04-26T00:00:00</comment_date></row><row _id="row-ngu7.xi5y.dvbh" _uuid="00000000-0000-0000-1AA9-5A7B6EBC138A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ngu7.xi5y.dvbh"><intent_id>1321831</intent_id><project_id>1064693</project_id><text_data>Other Truck: 4000 gallon on road. Water truck use for dust control and compaction.</text_data><comment_date>2023-04-21T00:00:00</comment_date></row><row _id="row-b622.44cr-vmf3" _uuid="00000000-0000-0000-56D5-E1C001A43B78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b622.44cr-vmf3"><intent_id>1364800</intent_id><project_id>1023267</project_id><text_data>Project #222137Truck Drivers - Other Trucks: Semi (tractors) with 53 foot flatbed trailers to haul temporary concrete barrier.</text_data><comment_date>2023-09-19T00:00:00</comment_date></row><row _id="row-ync7_s59s_rude" _uuid="00000000-0000-0000-A1EE-95CB3D5763EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ync7_s59s_rude"><intent_id>1094730</intent_id><project_id>935721</project_id><text_data>Small shrubs and bark mulch were added to the existing landscape using hand shovels and wheelbarrows. Bark mulch was laid at a depth of 3'. Repairs were made to the existing irrigation system. Line cracks were exposed using hand shovels. Pipes were repaired with couplers. Hand saws were used to cut the pipe. Above ground sprinkler heads were replaced by unscrewing them by hand. Some irrigation was added by hand digging trenches at a depth of 1' and laying new pipe and attaching sprinkler heads.</text_data><comment_date>2020-10-09T00:00:00</comment_date></row><row _id="row-e47s.i9fk_jps9" _uuid="00000000-0000-0000-CF50-CF944C088CFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e47s.i9fk_jps9"><intent_id>1075650</intent_id><project_id>925638</project_id><text_data>This filing is for the correct project. We filed an intent 6/22/2020. Contractor gave #1020189 as the intent. Certified payroll will be re-entered on this project.</text_data><comment_date>2020-07-28T00:00:00</comment_date></row><row _id="row-wwsq~gh5q~kkhq" _uuid="00000000-0000-0000-52D8-C3CD8893FD45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wwsq~gh5q~kkhq"><intent_id>573401</intent_id><project_id>712533</project_id><text_data>Other truck is a 3000 gallon water truck</text_data><comment_date>2013-06-05T00:00:00</comment_date></row><row _id="row-jsft~723i.qdqx" _uuid="00000000-0000-0000-886C-0C263D4FA32F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jsft~723i.qdqx"><intent_id>662451</intent_id><project_id>747490</project_id><text_data>8088 Quinn 16308 B St. E #4 Tacoma, WA 98445</text_data><comment_date>2014-10-27T00:00:00</comment_date></row><row _id="row-ncnc_szrp~qg8b" _uuid="00000000-0000-0000-AD0E-0C010AA06DA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ncnc_szrp~qg8b"><intent_id>816897</intent_id><project_id>811951</project_id><text_data>Our duties for this project were to bring playground material in our truck to the facility where everything was marked and ready for our employee (landscape construction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used.Truck = KENWORTH T-800 4 axleTrailer = IMCO live floor trailer 48�This truck was used to deliver Engineered Wood Fiber (a type of Playground Chip). Material was delivered using our blower trailer to blow material into designated areas specified by the Prime Contractor.</text_data><comment_date>2017-02-21T00:00:00</comment_date></row><row _id="row-9dbv-zac8.sev9" _uuid="00000000-0000-0000-EECA-CF68DC56C95F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9dbv-zac8.sev9"><intent_id>829762</intent_id><project_id>819436</project_id><text_data>Install new cables that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-04-28T00:00:00</comment_date></row><row _id="row-t9xx.c92z-a4wr" _uuid="00000000-0000-0000-E954-1B1F4986B0DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9xx.c92z-a4wr"><intent_id>1245507</intent_id><project_id>1003818</project_id><text_data>#1 - Install ductless heat pump system   #2 - Single family dwelling   #3 - 1   #4 - Primary Residence   (a) No   (b) No   (c) Yes   (d) No   (e) No   (f) No   (g) No   (h) No   (I) No   (j) No   (k) No   (l)   #5 -Yes   #6 - Yes   #7 - No   #8 - No</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-q5ue~s5qc-fk6m" _uuid="00000000-0000-0000-DBB4-A24846FAF850" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5ue~s5qc-fk6m"><intent_id>882018</intent_id><project_id>840759</project_id><text_data>Order 871661</text_data><comment_date>2018-01-05T00:00:00</comment_date></row><row _id="row-ndbd~zn7n_swvm" _uuid="00000000-0000-0000-C1C6-FA835DA0425F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ndbd~zn7n_swvm"><intent_id>729394</intent_id><project_id>775832</project_id><text_data>Smoke remediation in payroll and multiple offices, Deodorization equipment used (Negative air and hydroxyl) and A van used for travel.</text_data><comment_date>2015-11-02T00:00:00</comment_date></row><row _id="row-w4i7-d56y.3q8x" _uuid="00000000-0000-0000-69E9-F8E9F08FB3A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w4i7-d56y.3q8x"><intent_id>762470</intent_id><project_id>774368</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Opening up areas for exploratory. This in preparation for doing exterior siding work.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment#3 - Including any basement or garage, how many stories or levels does the structure have? 4#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? Yes (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? Yes (k) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? yes#6 - Does each dwelling unit have its own bathroom? Yes#7 - Is there a community facility or manager�s office on site? Yes#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2016-05-17T00:00:00</comment_date></row><row _id="row-dquj~4nje~99p9" _uuid="00000000-0000-0000-A358-6A8FC60AAB26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dquj~4nje~99p9"><intent_id>513001</intent_id><project_id>687470</project_id><text_data>Filed by: Rocky Simpson</text_data><comment_date>2012-05-22T00:00:00</comment_date></row><row _id="row-cbdi.zz3z~5jxv" _uuid="00000000-0000-0000-5C16-A217EF863F02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cbdi.zz3z~5jxv"><intent_id>968399</intent_id><project_id>868562</project_id><text_data>1 - Repair leak in water pipe   2 - single family dwelling 3 - 14 - a - no b - no c - yes d - no e - no f - no g- no h - no i - no j - no k - no l - 5 - yes 6 - yes  7 no 8 no</text_data><comment_date>2019-03-29T00:00:00</comment_date></row><row _id="row-s4wy.rfcy~xrs3" _uuid="00000000-0000-0000-5B5C-0D5255496D1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4wy.rfcy~xrs3"><intent_id>1252230</intent_id><project_id>1023508</project_id><text_data>JOB #4675</text_data><comment_date>2022-07-26T00:00:00</comment_date></row><row _id="row-ijw2-g5v2~hs8k" _uuid="00000000-0000-0000-6E31-0DB25B0DCBCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijw2-g5v2~hs8k"><intent_id>788509</intent_id><project_id>731925</project_id><text_data>This intent was probably first filed under Great Graphics &amp; Signs, Inc.  However the week before the project was to be installed, i received all records for the corporation pertaining to open contracts, at that time i was able to find installers to work this job; however i had surgery that week and was not able to get all my licenses in effect before this job had to be installed.</text_data><comment_date>2016-09-11T00:00:00</comment_date></row><row _id="row-jir6~mfrh_vazt" _uuid="00000000-0000-0000-2A3C-FB63D755C348" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jir6~mfrh_vazt"><intent_id>1135819</intent_id><project_id>958170</project_id><text_data>The PUD submitted a request for us to fabricate 289 pieces out a A-36 mild steel, all of which needed to be galvanized and marked according to their designation.  These pieces were cut on the plasma table, deburred, and sent to Seattle for galvanizing.  Copper Creek Fabrication was not told if this was part of another job nor their intended use.</text_data><comment_date>2021-04-20T00:00:00</comment_date></row><row _id="row-ax76_jsu8_d79k" _uuid="00000000-0000-0000-846E-3A2FFF434D53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ax76_jsu8_d79k"><intent_id>571678</intent_id><project_id>711117</project_id><text_data>Other Truck - Water Truck for dust control</text_data><comment_date>2013-05-27T00:00:00</comment_date></row><row _id="row-8jr2_uy8z.xrbk" _uuid="00000000-0000-0000-F43E-69AE88EDB25F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8jr2_uy8z.xrbk"><intent_id>792482</intent_id><project_id>803651</project_id><text_data>WO 9301165</text_data><comment_date>2016-09-28T00:00:00</comment_date></row><row _id="row-yvnh.8pbd.n2n3" _uuid="00000000-0000-0000-DA0E-85A4FE291699" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yvnh.8pbd.n2n3"><intent_id>994401</intent_id><project_id>888200</project_id><text_data>FILED BY TERESA POLEJEWSKI</text_data><comment_date>2019-07-24T00:00:00</comment_date></row><row _id="row-788r~iuig.vx9m" _uuid="00000000-0000-0000-D978-6B527AA3FB3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-788r~iuig.vx9m"><intent_id>518216</intent_id><project_id>690158</project_id><text_data>The wall is in the middle of a landscape and is for beautification only.</text_data><comment_date>2012-07-16T00:00:00</comment_date></row><row _id="row-74v4.5xtj~sdpr" _uuid="00000000-0000-0000-AFDC-358ED8C34A9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74v4.5xtj~sdpr"><intent_id>962631</intent_id><project_id>874348</project_id><text_data>Filed by Daniel N Nilsen</text_data><comment_date>2019-02-28T00:00:00</comment_date></row><row _id="row-xugt.aean-ezhm" _uuid="00000000-0000-0000-5FD7-8D4EB7CFA15D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xugt.aean-ezhm"><intent_id>1185907</intent_id><project_id>983925</project_id><text_data>WO #421106</text_data><comment_date>2021-10-15T00:00:00</comment_date></row><row _id="row-t2fp.z9td-zthf" _uuid="00000000-0000-0000-E55A-CB8D7674A4F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t2fp.z9td-zthf"><intent_id>701918</intent_id><project_id>763456</project_id><text_data>LONG J#5020.150161 EB</text_data><comment_date>2015-06-18T00:00:00</comment_date></row><row _id="row-4u5m.rib4~xbjw" _uuid="00000000-0000-0000-D938-3F1F58EB2D6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4u5m.rib4~xbjw"><intent_id>1280578</intent_id><project_id>1037586</project_id><text_data>Additional work was requested by WSU personnel. Change orders included to this project due in change in scope.</text_data><comment_date>2022-11-02T00:00:00</comment_date></row><row _id="row-kp57-ipk5.dksu" _uuid="00000000-0000-0000-D8EB-35AB39F2F964" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kp57-ipk5.dksu"><intent_id>553075</intent_id><project_id>696688</project_id><text_data>Owner OperatorDump Truck Driver</text_data><comment_date>2013-01-22T00:00:00</comment_date></row><row _id="row-9jxv-6v8e-g2fk" _uuid="00000000-0000-0000-E902-7800F56D99AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9jxv-6v8e-g2fk"><intent_id>881346</intent_id><project_id>840471</project_id><text_data>#19716, Martin Boles, 1014 E. Ermina, Spokane, 99207#19923, Erica Mugica, 11205 E. 12th, Spokane Valley, 99206#19924, Deborah Kirwin, 20811 N. Yale Rd., Colbert, 99005#19910, Joshua Dukes, 2615 E. Longfellow, Spokane, 99207#19878, Melissa Lantz, 316 S. Blake Rd., Spokane Valley, 99216#19919, May Colvin, 6300 E. 2nd, #89, Spokane Valley, 99212#16612, Joan Brown, 2311 W. 16th, #156, Spokane, 99224#19918, Diane Picanso, 2311 W. 16th, #139, Spokane, 99224#19950, Roger Logan, 429 E. Mill Rd., Latah, 99018#19905, Nancy Allan, 2223 S. Conklin rd., Spokane Valley, 99037#19903, Daniel Sexton, 1208 W. Grace, Spokane, 99205#19909, Michael Best, 1225 E. Crown, Spokane, 99207#19948, Richard Link, 1701 S. Lawson #2, Airway Heights, 99001#19960, Steve Schaefer, 1113 W. Maxwell Spokane, 99201#19917, Laverna Lord, 15015 N. South Richmond Ln., Mead, 99021#19913, Shantel Schrag, 14523 N. Farragut Ln., Mead, 99021#19881, Brian Barber, 918 N. Hogan, Spokane, 99202#19945, Sarahann Whiting, 302 W. Portland #9, Fairfield, 99012#19915, Albert Lemeza, 20419 N. Newport HWY., Colbert, 99005#19840, Jerry Barnard, 104 Pineview Pl., Cheney, 99004#1. Weatherization, #2. Single family dwelling, #3. 2 story, #4. a. no, b. no, c. yes, d. no, e. no, f. no, g. no, h. no, I.no, j. no, k. no, L. n/a. #5. yes, #6. yes, #7. no, #8. no</text_data><comment_date>2018-01-02T00:00:00</comment_date></row><row _id="row-n4m9-jsh6~73hs" _uuid="00000000-0000-0000-E0FD-A4DD78BB1D44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n4m9-jsh6~73hs"><intent_id>1003307</intent_id><project_id>875550</project_id><text_data>Transportation</text_data><comment_date>2019-08-28T00:00:00</comment_date></row><row _id="row-c32k_ni7r~8ypd" _uuid="00000000-0000-0000-09D6-FC937AB93860" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c32k_ni7r~8ypd"><intent_id>821817</intent_id><project_id>816090</project_id><text_data>HS HEATING PLANT SURVEY AND RECHARGE EXPANSION TANK</text_data><comment_date>2017-03-21T00:00:00</comment_date></row><row _id="row-nbrz~374n-9j22" _uuid="00000000-0000-0000-0EF8-B926296C30DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nbrz~374n-9j22"><intent_id>664344</intent_id><project_id>748267</project_id><text_data>Form filed by: Verna Dessert</text_data><comment_date>2014-11-06T00:00:00</comment_date></row><row _id="row-wiwu~namq-vgsb" _uuid="00000000-0000-0000-ACEF-E31390CBF1A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wiwu~namq-vgsb"><intent_id>722911</intent_id><project_id>773322</project_id><text_data>A)As the general contractor all of the project is our part, we have full responsibility over the work that is being performed either by our subcontractor or our employees if we have any working on the project.B) upon further review with the Project Manager we will not have any employees working on this project, it will be completely subcontracted out.</text_data><comment_date>2015-10-07T00:00:00</comment_date></row><row _id="row-zheu_u3ks-djig" _uuid="00000000-0000-0000-ED55-90D8100A7570" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zheu_u3ks-djig"><intent_id>1189417</intent_id><project_id>985866</project_id><text_data>TEST, REPAIR, AND/OR REPLACE EAST DOOR PROXIMITY READER.</text_data><comment_date>2021-10-28T00:00:00</comment_date></row><row _id="row-5ds6~jjr3_9b6k" _uuid="00000000-0000-0000-A487-ACCE28D36AE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ds6~jjr3_9b6k"><intent_id>1091670</intent_id><project_id>930417</project_id><text_data>Changed answer above: we will be using a subcontractor for the hydroseeding and will provide the proper information on the affidavits.Washed rock: our team is ground/hand labor only. Our team will lay down a fabric barrier, then have the rock itself delivered/dumped by a 3rd party, then our team will hand rake / smooth the rock in place. Our team will not use any power equipment for these tasks.</text_data><comment_date>2020-10-08T00:00:00</comment_date></row><row _id="row-6ej4~84uv_angv" _uuid="00000000-0000-0000-DB5D-68D9E6D96AA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ej4~84uv_angv"><intent_id>1214644</intent_id><project_id>1001488</project_id><text_data>Specific trade is fire extinguisher technician. That specific trade wasn't an option to choose.</text_data><comment_date>2022-03-01T00:00:00</comment_date></row><row _id="row-wph8-qzka_p8iy" _uuid="00000000-0000-0000-17DF-E87ABA34993E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wph8-qzka_p8iy"><intent_id>1193461</intent_id><project_id>988011</project_id><text_data>Will used gas powered trimmers to clear back brush. Weeds will be removed by hand or spot sprayed with herbicide. Plants will installed using shovels.</text_data><comment_date>2021-11-16T00:00:00</comment_date></row><row _id="row-rtdf_b9gw_58za" _uuid="00000000-0000-0000-4336-E464D0A40C83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rtdf_b9gw_58za"><intent_id>651381</intent_id><project_id>649039</project_id><text_data>PW hour/fringe rates are 2010 &amp; 2011</text_data><comment_date>2014-08-29T00:00:00</comment_date></row><row _id="row-hatq~8bhk~9w3w" _uuid="00000000-0000-0000-A060-9F4AE7922CCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hatq~8bhk~9w3w"><intent_id>1240431</intent_id><project_id>1017149</project_id><text_data>12032, 12033, 12034</text_data><comment_date>2022-06-10T00:00:00</comment_date></row><row _id="row-k3xn~5cm2.2y7r" _uuid="00000000-0000-0000-4AEA-C9DB75F50A5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3xn~5cm2.2y7r"><intent_id>1227495</intent_id><project_id>1009634</project_id><text_data>Fringe Benefits Total $32.14Insurance $9.46Employer Paid Pensions $16.55Vacation $4.00Apprenticeship programs $2.13</text_data><comment_date>2022-04-21T00:00:00</comment_date></row><row _id="row-5ytt.5ynq-rs9g" _uuid="00000000-0000-0000-E3FC-D16D125C2E16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ytt.5ynq-rs9g"><intent_id>723146</intent_id><project_id>773405</project_id><text_data>Filed by Laura L. Kickbusch.</text_data><comment_date>2015-09-28T00:00:00</comment_date></row><row _id="row-5g3e-zwaj-7xz7" _uuid="00000000-0000-0000-0985-7CF138BA8FBC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5g3e-zwaj-7xz7"><intent_id>626285</intent_id><project_id>732174</project_id><text_data>Form filed by: Jonn Schurman</text_data><comment_date>2014-04-23T00:00:00</comment_date></row><row _id="row-3pjh-2jje.2wvg" _uuid="00000000-0000-0000-2CA8-2888A9184256" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3pjh-2jje.2wvg"><intent_id>1314211</intent_id><project_id>1060010</project_id><text_data>Work consists of furnishing and installing 31 button style skate deterrents on concrete seat walls and installation of 3 pre-fabricated trellis structures. Trellis Structures: The footings and anchor bolts are existing. Work will require the contractor to pick up the trellis structures from city of Vancouver operation center located at 4711 Fourth Plain Blvd. Install the trellis structures plumb, add grout as needed and touch up any nicks and scrapes occurred during installation. Concrete finish flat work and other concrete seat wall work is not part of this project. It will be done by other. The City has obtained building permits for the trellis and will be provided to the contractor. The trellis structure installation must be completed by April 7, 2023. Skate Deterrents: Furnish and Install Button style Skate Deterrents. Installation requires drilling and setting them in epoxy. Special care must be made as not to spall out the edge of the concrete, drilling a small hole and then a larger hole is recommended. Contractor shall furnish stainless steel vandal resistant fasteners appropriate for the work to be completed. The skate deterrent installation should be completed by April 28, 2023, pending availability.</text_data><comment_date>2023-03-31T00:00:00</comment_date></row><row _id="row-k54g-4eti.vkx6" _uuid="00000000-0000-0000-F3B4-A2085579FD76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k54g-4eti.vkx6"><intent_id>656149</intent_id><project_id>743048</project_id><text_data>Job # 60823</text_data><comment_date>2014-09-23T00:00:00</comment_date></row><row _id="row-bcax.8yk6_nqc5" _uuid="00000000-0000-0000-E9CE-2C6C31AA37BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bcax.8yk6_nqc5"><intent_id>549752</intent_id><project_id>702047</project_id><text_data>5343 Randall Ave SE</text_data><comment_date>2012-12-26T00:00:00</comment_date></row><row _id="row-i279-km8u~h492" _uuid="00000000-0000-0000-54C0-317D6845B32A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i279-km8u~h492"><intent_id>899780</intent_id><project_id>847117</project_id><text_data>Will use a 40 cy blower truck to place 3&amp;quot; compost layer on ground to be hydroseeded</text_data><comment_date>2018-04-20T00:00:00</comment_date></row><row _id="row-u65c-yf3t_2edd" _uuid="00000000-0000-0000-1B62-2B2933ACFC1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u65c-yf3t_2edd"><intent_id>460132</intent_id><project_id>667812</project_id><text_data>336,680-00 - Industrial Insurance - looe235</text_data><comment_date>2011-06-22T00:00:00</comment_date></row><row _id="row-ezhe_pnnz_gnbe" _uuid="00000000-0000-0000-B3AE-8B40338E8EA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezhe_pnnz_gnbe"><intent_id>779002</intent_id><project_id>798517</project_id><text_data>This is a single dwelling. One Story.</text_data><comment_date>2016-08-01T00:00:00</comment_date></row><row _id="row-e654~hvib.n3ww" _uuid="00000000-0000-0000-5F68-731059646A11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e654~hvib.n3ww"><intent_id>496928</intent_id><project_id>681396</project_id><text_data>5.70 medical, 2.16 pension, 2.07 vacation, 1.53 holiday</text_data><comment_date>2012-01-13T00:00:00</comment_date></row><row _id="row-4f4i.7hhd_rdn8" _uuid="00000000-0000-0000-14FA-563BFBEDA1CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4f4i.7hhd_rdn8"><intent_id>1060366</intent_id><project_id>913778</project_id><text_data>CONCRETE DELIVERIES</text_data><comment_date>2020-05-26T00:00:00</comment_date></row><row _id="row-thci.59az.x3ud" _uuid="00000000-0000-0000-4615-C22DE55F576E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thci.59az.x3ud"><intent_id>1322077</intent_id><project_id>1064821</project_id><text_data>Vacuum truck to suck up all contaminated liquidsPressure Washer to clean affected areaHaz Waste worker to clear all debris using shovel/rake/broom</text_data><comment_date>2023-04-24T00:00:00</comment_date></row><row _id="row-49f8_sfv2.pc9d" _uuid="00000000-0000-0000-EE1C-4C04072F0387" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49f8_sfv2.pc9d"><intent_id>1129395</intent_id><project_id>953457</project_id><text_data>Hydroseeding and installing bark mulch and topsoil.</text_data><comment_date>2021-03-17T00:00:00</comment_date></row><row _id="row-3z5r~yg6y-qfc8" _uuid="00000000-0000-0000-7845-327CB34FC248" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3z5r~yg6y-qfc8"><intent_id>462420</intent_id><project_id>659609</project_id><text_data>ALLIED'S JOB #110616-0049.219</text_data><comment_date>2011-06-23T00:00:00</comment_date></row><row _id="row-ddk6-a9fm-mvah" _uuid="00000000-0000-0000-EA5D-EB079498833E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ddk6-a9fm-mvah"><intent_id>1250953</intent_id><project_id>1022887</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with the wage rate determined by the Secretary of HUD to be prevailing in the locality with respect to such trade or position as provided under 24 CFR 965.101(a)(2)(iv).  BCI Project No. HS1022Filed by Kathi Clark</text_data><comment_date>2022-07-21T00:00:00</comment_date></row><row _id="row-djjv-8xy5.9sqc" _uuid="00000000-0000-0000-20DF-0D032E2524C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-djjv-8xy5.9sqc"><intent_id>466434</intent_id><project_id>665354</project_id><text_data>You returned our form for correction because they put down the wrong contractor registration number. Please advise we are ok now. We have already paid the $40.00</text_data><comment_date>2011-07-18T00:00:00</comment_date></row><row _id="row-2z7p-ne8b.xch3" _uuid="00000000-0000-0000-EB85-B5B546E5C7E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2z7p-ne8b.xch3"><intent_id>824983</intent_id><project_id>815075</project_id><text_data>Hourly Fringe breakdown:  Health: $7.52 Pension: $9.95 Apprenticeship: .69 Vacation: $1.50 Annuity: $6.55 West WA IMPACT: .25 West WA JM Assessment: $1.11 Industry: .02</text_data><comment_date>2017-04-13T00:00:00</comment_date></row><row _id="row-uf85~3ukt_3jrw" _uuid="00000000-0000-0000-7A23-7229F244B048" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uf85~3ukt_3jrw"><intent_id>1004366</intent_id><project_id>889805</project_id><text_data>2269800</text_data><comment_date>2019-09-04T00:00:00</comment_date></row><row _id="row-jzd8.nsm5~nayv" _uuid="00000000-0000-0000-95F6-937471D2DDFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzd8.nsm5~nayv"><intent_id>1145615</intent_id><project_id>936672</project_id><text_data>CORRECTION:**1) Including any basement or garage, how many stories or levels does the structure have? ANSWER: 1 story on each building</text_data><comment_date>2021-05-24T00:00:00</comment_date></row><row _id="row-a5ab_97it~2s6t" _uuid="00000000-0000-0000-C44A-EF8D7E2D611F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5ab_97it~2s6t"><intent_id>896721</intent_id><project_id>791095</project_id><text_data>New construction of middle school; we will be beautifying the area with installation of plants, 3&amp;quot; of mulch &amp; 4-6&amp;quot; of topsoil.  Irrigation will be installed with trenching no deeper than 18&amp;quot;.  We will be using common landscaping tools such as wheelbarrows, rakes, shovels, picks &amp; other common landscaping tools.</text_data><comment_date>2018-04-04T00:00:00</comment_date></row><row _id="row-mibj~3pdh~2pjp" _uuid="00000000-0000-0000-EF14-5821D72A06EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mibj~3pdh~2pjp"><intent_id>599121</intent_id><project_id>721190</project_id><text_data>I made corrections on the Statement of Intent to Pay Prevailing Wages. My apologies for filling it out incorrectly (the fringe benefit included the wage, the benefits, and taxes).Breakdown of fringe benefits:Electrician-Journey Level: $9.83 retirement, $8.45 medical insurance, $1.20 medical flex plan, $1.11 training/admin, Total $20.59 fringe benefit per hour</text_data><comment_date>2013-11-12T00:00:00</comment_date></row><row _id="row-fweu-7sjx~jjxq" _uuid="00000000-0000-0000-B0C2-464A75074679" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fweu-7sjx~jjxq"><intent_id>883717</intent_id><project_id>837452</project_id><text_data>Install Data cable Cat 6 inside building</text_data><comment_date>2018-01-17T00:00:00</comment_date></row><row _id="row-u9u8-asdy~qawe" _uuid="00000000-0000-0000-8C7E-305CD18EB987" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u9u8-asdy~qawe"><intent_id>617889</intent_id><project_id>729857</project_id><text_data>LAN System - Elect Tech (06)  to add additional data drops.  Work to be performed indoors</text_data><comment_date>2014-02-26T00:00:00</comment_date></row><row _id="row-ev4a~ffva.8zwi" _uuid="00000000-0000-0000-3767-775DF587ADBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ev4a~ffva.8zwi"><intent_id>1205419</intent_id><project_id>995759</project_id><text_data>WO 238411 - BOILERS OFFLINE</text_data><comment_date>2022-01-18T00:00:00</comment_date></row><row _id="row-t5xe.m9bf.dw4z" _uuid="00000000-0000-0000-04D5-2BA337AB64F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t5xe.m9bf.dw4z"><intent_id>798259</intent_id><project_id>805844</project_id><text_data>Apple Valley Construction  will Repair tile roof</text_data><comment_date>2016-10-27T00:00:00</comment_date></row><row _id="row-gd2x.m9v2_bvye" _uuid="00000000-0000-0000-FE53-68436539EF73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gd2x.m9v2_bvye"><intent_id>1173329</intent_id><project_id>977166</project_id><text_data>9875341</text_data><comment_date>2021-08-30T00:00:00</comment_date></row><row _id="row-i7vu~gxvs.pwfu" _uuid="00000000-0000-0000-646D-6FBBDE31B3F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7vu~gxvs.pwfu"><intent_id>614145</intent_id><project_id>728238</project_id><text_data>Landscape maintenance, mowing, blowing, weeding, mulch and pruning</text_data><comment_date>2014-01-29T00:00:00</comment_date></row><row _id="row-xwd3~fcve_xvfp" _uuid="00000000-0000-0000-BB7F-2EF885ECC944" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xwd3~fcve_xvfp"><intent_id>1305589</intent_id><project_id>1009806</project_id><text_data>Approval of Intent and Affidavit forms is based upon the information provided by you. It does not signify approval of the classifications of labor used by the contractor.</text_data><comment_date>2023-04-27T00:00:00</comment_date></row><row _id="row-r78w_rmjm-ruqf" _uuid="00000000-0000-0000-22AF-4872A1EC0815" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r78w_rmjm-ruqf"><intent_id>691079</intent_id><project_id>704980</project_id><text_data>***This form is being approved on the basis of your statement that your employees will perform professional electrical testing services using portable test equipment and will perform no tasks which require the use of hand or construction tools which are considered the work of a laborer, worker, or mechanic within the meaning of the prevailing wage laws. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2015-04-28T00:00:00</comment_date></row><row _id="row-qc66_a2nu~b57n" _uuid="00000000-0000-0000-1DEC-B8CD90FABB37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qc66_a2nu~b57n"><intent_id>1155491</intent_id><project_id>936359</project_id><text_data>Breakdown of fringe benefits:Total: $26.06Vacation PTO: $1.94HealIndividual Account Pension: $8.00Pension: $5.62Occupational Health: $0.01Health &amp; Welfare: $9.24Apprentice Training: $1.00International Training Fund: $0.10Industry Fund: $0.10Labor Management Contribution Fund: $0.05</text_data><comment_date>2021-06-24T00:00:00</comment_date></row><row _id="row-2jzc-7s3p_exej" _uuid="00000000-0000-0000-E225-17DC9FA10E0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2jzc-7s3p_exej"><intent_id>672718</intent_id><project_id>752148</project_id><text_data>The scope of work for maintenance services includes :  (This contract is for multiple sites which have different schedules but however the same work is performed, using the same tools.)Turf:Mowing � using regular push mowersTrimming � using a hand held 2 hp weed wackerEdging � using a hand held 2 hp edgerFertilizing � using a walk behind fertilizer spreaderHerbicide application � using back pack sprayer 4 gallonTREES, SHRUBS AND GROUND COVER BEDSWeeding � using hula hoes, a rake to pile up and hand stuffed into a garbage bag.Trimming Ground Cover � trimming/pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage can.Pruning Shrubs - trimming / pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage canPre-emergent Herbicide � hand held spreaderHARD SURFACES	Sweeping � using back pack air blowers Weeds � using back pack sprayer 4 gallonOTHERLeaf Removal � Raked into piles and placed into 30 gallon garbage cans.Litter � Picked up by hand and placed into garbage bags.ANNUAL FLOWER BEDSChange Annual Color � remove existing annual color with shovels, replace with new annual color and cover new material using shovel and rake bed using hand held rakes.Fertilizer � applied using a hand held spreaderGroom Annuals � no tools, hand groomingWeeding - no tools, hand weedingHerbicide � applied using back pack sprayersIRRIGATIONSystem Start-up � small shovel to remove dirt from system.Operate System � no toolsWinterize System � air compressor is used to blow system.All work is hauled off site with a F-350 Ford Truck.</text_data><comment_date>2015-01-08T00:00:00</comment_date></row><row _id="row-ejvt.czfy_gcgi" _uuid="00000000-0000-0000-C6F5-AE5BB98890D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ejvt.czfy_gcgi"><intent_id>870839</intent_id><project_id>811843</project_id><text_data>laborers prepare ground site for concrete landscape edging to be placed</text_data><comment_date>2017-10-24T00:00:00</comment_date></row><row _id="row-2hz4_t554_t2k2" _uuid="00000000-0000-0000-71E3-A6E758B13E2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2hz4_t554_t2k2"><intent_id>613241</intent_id><project_id>573534</project_id><text_data>We performed native plant installation using shovels and weed barrier installation.  We also installed tree protection which involves taking plastic mesh and cutting it to go around the base of the tree to protect against wildlife.  A bamboo stake is installed to hold it in place.  Tools and equipment used included hand tools such as shovels and hoes for planting and scalping.</text_data><comment_date>2014-01-31T00:00:00</comment_date></row><row _id="row-kztu-j7zu~8b66" _uuid="00000000-0000-0000-785D-1168E2CDCA9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kztu-j7zu~8b66"><intent_id>923337</intent_id><project_id>856422</project_id><text_data>We will be providing and installing new seeding and compost on the job site</text_data><comment_date>2018-08-06T00:00:00</comment_date></row><row _id="row-p5ia-indd-qdk8" _uuid="00000000-0000-0000-47C2-BD797FC7A50C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p5ia-indd-qdk8"><intent_id>848852</intent_id><project_id>819850</project_id><text_data>HIRED BY IMCO GENERAL</text_data><comment_date>2017-07-20T00:00:00</comment_date></row><row _id="row-twv2.7t5r.t3ji" _uuid="00000000-0000-0000-FFA0-2BBA54ECAD3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-twv2.7t5r.t3ji"><intent_id>1247873</intent_id><project_id>1021296</project_id><text_data>? Install existing patch panels to back of existing cabinet in MDF.? Clean up and Coil existing cabling hanging from ceiling. Label ceiling tile for future.? Relocate existing cables in front area to new cubicle locations.? Create and implement a labeling scheme that is compliant to EIA/TIA 606 and per customer�s approval.? Update as-built drawings to show exact location of all new cable drops and label scheme assigned to each cable drop.? Supply and install materials to support an open pathway, such as J-hooks and hangers where possible.? Terminate existing data cables at workstations with Cat6 RJ45 insert.? Test all existing data cabling to determine the integrity of the cabling.</text_data><comment_date>2022-07-11T00:00:00</comment_date></row><row _id="row-6kqr~yaw6_55c7" _uuid="00000000-0000-0000-95C5-47376D3882F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6kqr~yaw6_55c7"><intent_id>574902</intent_id><project_id>712319</project_id><text_data>Correction to 6/20/13 Notes - only the mini excavator and skidsteer will be used and I'll add power equipment operators to the trade/occupation list.  The metal being cut and grinded is sheet metal.</text_data><comment_date>2013-07-03T00:00:00</comment_date></row><row _id="row-kvay~6q3y.kjeg" _uuid="00000000-0000-0000-E1A5-4345B555BA8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvay~6q3y.kjeg"><intent_id>929153</intent_id><project_id>855790</project_id><text_data>Fish Relocation Work (per conversation with Aaron Nelson)</text_data><comment_date>2018-08-28T00:00:00</comment_date></row><row _id="row-2axf-jwie_4itm" _uuid="00000000-0000-0000-E30F-51BF0299F818" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2axf-jwie_4itm"><intent_id>874071</intent_id><project_id>812285</project_id><text_data>Filed by Darrell Morgan</text_data><comment_date>2017-11-09T00:00:00</comment_date></row><row _id="row-jify.b9ai_vi9a" _uuid="00000000-0000-0000-EEB5-C9E6698199BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jify.b9ai_vi9a"><intent_id>726741</intent_id><project_id>774764</project_id><text_data>Filed by Chau Pham</text_data><comment_date>2015-10-16T00:00:00</comment_date></row><row _id="row-cysb_j79m-hhx2" _uuid="00000000-0000-0000-825B-0D272EAC8BAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cysb_j79m-hhx2"><intent_id>867432</intent_id><project_id>811496</project_id><text_data>NW PENSION	 7.98 LOCAL APPR	 1.10 HEALTH CARE / VEB	 12.32 ORG TRUST	 1.00 IND FUND	 0.65 NATL PENSION	 4.24 ITI/NEMI/SMOHI	 0.17 NW SUPPLEMENTAL	 0.79 CLEAN CARD	 0.07 	  TOTAL	 28.32</text_data><comment_date>2017-10-06T00:00:00</comment_date></row><row _id="row-dfms~3gyv~56me" _uuid="00000000-0000-0000-5E09-F39DAFCD32A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfms~3gyv~56me"><intent_id>604778</intent_id><project_id>722710</project_id><text_data>Filed by Andrew Acres.</text_data><comment_date>2013-11-15T00:00:00</comment_date></row><row _id="row-yv64~y2za.swzy" _uuid="00000000-0000-0000-2D08-D8087D7A63AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yv64~y2za.swzy"><intent_id>956568</intent_id><project_id>871442</project_id><text_data>General laborer consists of hand work only (no power tools or equipment) $31.43 base + $7.86 pensionBlade operator is used for grading the project before paving or chip sealing operations $35.99 base + $9.00 pensionOther trucks consists of the following:1)0 to 8,000 gallon water truck used to help with compaction and dust control $36.19 base + $9.05 pension2) Oil distributor is used to distribute oil for chip sealing operations $36.19 base + $9.05 pension</text_data><comment_date>2019-01-23T00:00:00</comment_date></row><row _id="row-6bmi_8atp_bw7r" _uuid="00000000-0000-0000-8601-096E7E22C1CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6bmi_8atp_bw7r"><intent_id>470379</intent_id><project_id>671632</project_id><text_data>Spoke with Ramona she approved the painter wage and fringe.  2.00 medical and 2.00 pension.</text_data><comment_date>2011-08-23T00:00:00</comment_date></row><row _id="row-ybvn.4uem_s4ts" _uuid="00000000-0000-0000-D743-279CAAC7A9D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ybvn.4uem_s4ts"><intent_id>763180</intent_id><project_id>792440</project_id><text_data>Davis Bacon Wages Apply</text_data><comment_date>2016-05-19T00:00:00</comment_date></row><row _id="row-9wg7.ppvc~d336" _uuid="00000000-0000-0000-03CB-6B5318D3D4FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9wg7.ppvc~d336"><intent_id>1222417</intent_id><project_id>1006502</project_id><text_data>1.- General weatherization /Repairs/ Energy upgrades.2.- Single home3.- 2 levels4.- a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-no.5.- yes6.- yes7.-no 8.- no</text_data><comment_date>2022-03-31T00:00:00</comment_date></row><row _id="row-j4un~knss-i2wg" _uuid="00000000-0000-0000-5314-0E946FEDC867" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j4un~knss-i2wg"><intent_id>747365</intent_id><project_id>785370</project_id><text_data>**2/18/2016**HOWARD1)Install Electric Water Heater2)YES3)1story + Basement4)a-no b-no c-yes d-no e-no f-no g-no h-no I-no j-no k-none5)YES6)YES7)NO8)NO</text_data><comment_date>2016-02-18T00:00:00</comment_date></row><row _id="row-few9_emgj_xaui" _uuid="00000000-0000-0000-82FB-038121125EA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-few9_emgj_xaui"><intent_id>525262</intent_id><project_id>685290</project_id><text_data>DEAR SIR OR MA'AM, I HAVE ATTACHED THE DESCRIPTION OF THE PORTION OF THIS PROJECT &amp;quot;C. LANDSCAPING 1) Trade Contractor shall provide and install plantings per 040-L-109...topsoil, mulch, compost, additives, stakes, protection&amp;quot;...   PLEASE NOTE THAT THIS IS A MITIGATION PROJECT... WE ARE DIGGING OUT THE LAGOON (OPERATOR) LOADING THE MATERIAL INTO A MAROOKA (OPERATOR)THAN SPREADING THE MATERIAL IN THE NEW AREA.. THE MAJORITY OF THE WORK IS DONE BY EQUIPMENT OPERATORS, BUT THERE ARE TREES (1 GALLON) AND SHRUBS (RANGING FROM BULBS TO 1 GALLON) THAT WILL NEED TO BE PLANTED, AND THE AREA RAKED OUT WITH MULCH, COMPOST, AND TOPSOIL.  PLEASE FEEL FREE TO CALL IF YOU HAVE ANY FURTHER QUESTIONS-JON @ 360-815-0264 (PM FOR THE PROJECT)</text_data><comment_date>2012-08-16T00:00:00</comment_date></row><row _id="row-az9y.jtsm_d5r8" _uuid="00000000-0000-0000-957F-B06FB545FDA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-az9y.jtsm_d5r8"><intent_id>621658</intent_id><project_id>717862</project_id><text_data>230280  - Crestline Elementary School</text_data><comment_date>2014-03-25T00:00:00</comment_date></row><row _id="row-eqyx_z34j.2kmr" _uuid="00000000-0000-0000-D64B-508E8A7A1E33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eqyx_z34j.2kmr"><intent_id>1469893</intent_id><project_id>1146749</project_id><text_data>INV # 52271013 SR # 57617048</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-mh8w-guvt~jk3j" _uuid="00000000-0000-0000-1B4F-5F6461302BB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mh8w-guvt~jk3j"><intent_id>999337</intent_id><project_id>866246</project_id><text_data>Correction: In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions and resubmit your form: #1 - Describe the work that your firm was contracted to perform. Residential electrical #2 - Is the structure a single-family dwelling, duplex, apartment, condominium, or other residential structure? single-family#3 - Including any basement or garage, how many stories or levels does the structure have? 1 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no(b) Any retail use in the structure? no(c) Permanent residence only? yes(d) Rehabilitation house? no(e) Transitional housing? no(f) Communal dining facility? no(g) Treatment services? no(h) Assisted living services? no(i) Dormitories? no(j) Counseling? no(k) Is each room and/or bed in the structure rented separately? no(l) Other services or uses?no  #5 - Does each dwelling unit have its own self-contained kitchen? yes#6 - Does each dwelling unit have its own bathroom? yes#7 - Is there a community facility or manager�s office on site? no #8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2019-09-05T00:00:00</comment_date></row><row _id="row-9mjs.2fte_y55j" _uuid="00000000-0000-0000-4952-196B7DC37A38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9mjs.2fte_y55j"><intent_id>1112722</intent_id><project_id>945170</project_id><text_data>7024072</text_data><comment_date>2021-01-01T00:00:00</comment_date></row><row _id="row-pqi6.7uhh.kvmb" _uuid="00000000-0000-0000-C94A-78B19E305244" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqi6.7uhh.kvmb"><intent_id>496326</intent_id><project_id>680667</project_id><text_data>Includes Small Storage Invoices 415529 &amp; 413444</text_data><comment_date>2012-01-10T00:00:00</comment_date></row><row _id="row-hnnx-m8bx.pkda" _uuid="00000000-0000-0000-7E89-6ABAE0351E7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hnnx-m8bx.pkda"><intent_id>563358</intent_id><project_id>708284</project_id><text_data>Spot spraying weeds with a backpack sprayer</text_data><comment_date>2013-04-05T00:00:00</comment_date></row><row _id="row-byry.qg5x_uwz7" _uuid="00000000-0000-0000-70E7-2B1E7563D90A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-byry.qg5x_uwz7"><intent_id>501957</intent_id><project_id>683372</project_id><text_data>Dig and install power, water, septic system, mobile home, grading, gravel, miscellaneous excavation.</text_data><comment_date>2012-02-28T00:00:00</comment_date></row><row _id="row-t86z_nnya.uivm" _uuid="00000000-0000-0000-1448-8DF61917B4E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t86z_nnya.uivm"><intent_id>620337</intent_id><project_id>729408</project_id><text_data>Form filed by: Gregory J Matheson</text_data><comment_date>2014-03-14T00:00:00</comment_date></row><row _id="row-dx7d.3m3w.rnhr" _uuid="00000000-0000-0000-CB1C-69B0A83EBE78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dx7d.3m3w.rnhr"><intent_id>933928</intent_id><project_id>861848</project_id><text_data>1517106</text_data><comment_date>2018-09-19T00:00:00</comment_date></row><row _id="row-buy2-quti.esei" _uuid="00000000-0000-0000-796A-38E12FF4E644" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-buy2-quti.esei"><intent_id>626428</intent_id><project_id>732313</project_id><text_data>Form filed by: Jeff Grubbs</text_data><comment_date>2014-04-24T00:00:00</comment_date></row><row _id="row-bgjc-4edz-8fdr" _uuid="00000000-0000-0000-233D-C3C2FBBA5AE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bgjc-4edz-8fdr"><intent_id>852537</intent_id><project_id>788574</project_id><text_data>RON RHOADS IS AN OWNER/OPERATORFRINGE BENEFITS ARE PAID IN FULL DIRECTLY TO THE EMPLOYEE</text_data><comment_date>2017-08-03T00:00:00</comment_date></row><row _id="row-jx7n-vi6p~cdd8" _uuid="00000000-0000-0000-DD6B-6680690454BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jx7n-vi6p~cdd8"><intent_id>604698</intent_id><project_id>690362</project_id><text_data>Fringe benefit of $15 per hour is paid in cash to workers.</text_data><comment_date>2013-11-22T00:00:00</comment_date></row><row _id="row-xmik~knkv-82xr" _uuid="00000000-0000-0000-873B-4210E47104DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xmik~knkv-82xr"><intent_id>759492</intent_id><project_id>790835</project_id><text_data>1) Intermountain West Insulation was hired</text_data><comment_date>2016-04-30T00:00:00</comment_date></row><row _id="row-vyyw~qyqp.8462" _uuid="00000000-0000-0000-4C15-2E94F83B35D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vyyw~qyqp.8462"><intent_id>797248</intent_id><project_id>805428</project_id><text_data>Provide labor and misc materials to wreck out old cabling and install new cabling which can be used for telephone (voice over distance) and data (bits &amp; bytes) connections within the telecommunications system. This work will be performed indoors.</text_data><comment_date>2016-10-21T00:00:00</comment_date></row><row _id="row-wd8g-fdcb_2ngu" _uuid="00000000-0000-0000-D118-6E6F52CD846C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wd8g-fdcb_2ngu"><intent_id>496818</intent_id><project_id>681159</project_id><text_data>Form filed by: Stephanie Johnson</text_data><comment_date>2012-01-12T00:00:00</comment_date></row><row _id="row-briw-mkuu~4ngk" _uuid="00000000-0000-0000-46D9-51D2996D0566" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-briw-mkuu~4ngk"><intent_id>878736</intent_id><project_id>825402</project_id><text_data>160391-Per WAC 296-127-01378 Telecommunications Technicians will be installing cabling for telephones and computers.  Backbone cabling for connectivity between MDF and IDF.  Cables will run indoors.  Terminate, test and label.</text_data><comment_date>2017-12-12T00:00:00</comment_date></row><row _id="row-2snv_3d6x_durt" _uuid="00000000-0000-0000-8E04-4FF265321883" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2snv_3d6x_durt"><intent_id>774590</intent_id><project_id>796884</project_id><text_data>Filed by Robin SaavedraE. North St. Phosphorus Reduction Retrofit project (EV-0125) involves the design of the storm water conveyance within existing right of-way areas and the design of a GULD approved (by Ecology) end-of-pipe treatment system in an acquired utility easement. It is understood that this project will require the City to acquire an easement to locate the end of pipe treatment system. If an easement agreement is reached with the private property owner, the design will be advanced to a final level. The preparation of the PS&amp;E package for E. North Street is expected to be performed under a separate task than the preparation of the PS&amp;E package for the other two sites as described below.E. Oregon St. Phosphorus Reduction Retrofit project (EV-0139) involves the design of storm water conveyance within a City owned parcel and existing right of-way areas and the design of GULD approved end-of-pipe treatment systems designed specifically for phosphorus removal within a phosphorus-limited watershed.Britton Road Phosphorus Reduction Retrofit project (EV- 0140) involves the design of storm water conveyance within existing right-of-way areas and the design of GULD approved treatment systems designed specifically for phosphorus removal in place of existing street tree installations and as catch basin retrofits.</text_data><comment_date>2016-07-13T00:00:00</comment_date></row><row _id="row-2tzk~hcrn_vkww" _uuid="00000000-0000-0000-AD29-30A986B2F6AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tzk~hcrn_vkww"><intent_id>1075505</intent_id><project_id>926951</project_id><text_data>#1: Recladding of existing two story apartment buildings and modifications to the office area in community building, #2: Apartments, #3: Two stories, #4a) No, b) No, c) Yes, d) No, e) No, f) No, g) No, h) No, i) No, j) Yes, k) No,  #5:Yes, #6: Yes, #7: Yes, #8: No</text_data><comment_date>2020-07-27T00:00:00</comment_date></row><row _id="row-vb7v-ntuv-svit" _uuid="00000000-0000-0000-44CC-C72D6B95E7E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vb7v-ntuv-svit"><intent_id>1190880</intent_id><project_id>975197</project_id><text_data>Kiewit job# 1036104900TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2021-11-03T00:00:00</comment_date></row><row _id="row-wrwu-q4v5~j2my" _uuid="00000000-0000-0000-D3EA-47A5594BA683" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wrwu-q4v5~j2my"><intent_id>648291</intent_id><project_id>735442</project_id><text_data>Electrician - InsideHealth $7.24 / Pension $14.85 / Training $0.53 - Total $22.62Job: 22385</text_data><comment_date>2014-08-15T00:00:00</comment_date></row><row _id="row-nd36.dni4-ibxp" _uuid="00000000-0000-0000-7D22-08E75EAD4D27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nd36.dni4-ibxp"><intent_id>639282</intent_id><project_id>738665</project_id><text_data>Laborer will be demolishing a 4 inch thick, and 4 feet tall brick wall on the jobsite. the purpose of the project is to repair and replace the HVAC system. the laborer will not be doing the set up tear down of jobsite upon further discussion.</text_data><comment_date>2014-07-08T00:00:00</comment_date></row><row _id="row-8f9k_yssj~2tuk" _uuid="00000000-0000-0000-12B6-3DCC194CD7AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8f9k_yssj~2tuk"><intent_id>568616</intent_id><project_id>710588</project_id><text_data>Form filed by: Martin Zapata</text_data><comment_date>2013-05-08T00:00:00</comment_date></row><row _id="row-thps_ux8n~v6m4" _uuid="00000000-0000-0000-D62C-C9FAA1FC522B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thps_ux8n~v6m4"><intent_id>510541</intent_id><project_id>672657</project_id><text_data>1111142</text_data><comment_date>2012-05-04T00:00:00</comment_date></row><row _id="row-3dr2_ryax-jsvv" _uuid="00000000-0000-0000-A7CD-0245F9F99962" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3dr2_ryax-jsvv"><intent_id>1176921</intent_id><project_id>978970</project_id><text_data>#1-We were contracted to REPLACE FURNACE #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2021-09-13T00:00:00</comment_date></row><row _id="row-itbn~smkx-e2bh" _uuid="00000000-0000-0000-B269-B92DBED666AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-itbn~smkx-e2bh"><intent_id>917301</intent_id><project_id>851880</project_id><text_data>Certified Fisheries Biologists and staff biologists will conduct fish exclusion professional services. The work includes fish capture and relocation from stream sections isolated for construction.</text_data><comment_date>2018-07-11T00:00:00</comment_date></row><row _id="row-nwxd.spw3-b3ni" _uuid="00000000-0000-0000-C5B3-21E11A019681" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nwxd.spw3-b3ni"><intent_id>979621</intent_id><project_id>880593</project_id><text_data>22664</text_data><comment_date>2019-05-22T00:00:00</comment_date></row><row _id="row-rzkk.mcdt-8nvm" _uuid="00000000-0000-0000-3BE6-32980C520881" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzkk.mcdt-8nvm"><intent_id>824299</intent_id><project_id>816494</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2017-04-03T00:00:00</comment_date></row><row _id="row-h2vf_58ps.6nhd" _uuid="00000000-0000-0000-0682-DB93E46EF724" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2vf_58ps.6nhd"><intent_id>863918</intent_id><project_id>830088</project_id><text_data>Indust Insurance 11875202Project Name updatedBid and award dates filled in per prime formThis is salvage of materials at no cost to prime, thus T&amp;M selectedHiring company is the Prime ContractorTrade updated from Gen Laborer to Carpenter Carpenter due to disassembly of carport boltingTrade wage updated on form to Carpenter Carpenter tradeNo owners working on this project</text_data><comment_date>2017-10-26T00:00:00</comment_date></row><row _id="row-8fna_db5a_37u2" _uuid="00000000-0000-0000-A1B2-6BD84F979584" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8fna_db5a_37u2"><intent_id>550510</intent_id><project_id>702418</project_id><text_data>May only use 1 employee on this job.</text_data><comment_date>2013-01-03T00:00:00</comment_date></row><row _id="row-h6aj~fxi9-4n9s" _uuid="00000000-0000-0000-673F-E9802738AB67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h6aj~fxi9-4n9s"><intent_id>888149</intent_id><project_id>840001</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trade occupations.</text_data><comment_date>2018-02-13T00:00:00</comment_date></row><row _id="row-m2wj.uxn6.7pxf" _uuid="00000000-0000-0000-0543-1EA48E2D6522" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2wj.uxn6.7pxf"><intent_id>559079</intent_id><project_id>706353</project_id><text_data>OTHER TRUCKS - LESS THAN 3000 GALLON WATER TRUCK USED TO COOL DOWN THE ASPHALT</text_data><comment_date>2013-03-07T00:00:00</comment_date></row><row _id="row-26cs-2ncd_dfyw" _uuid="00000000-0000-0000-32E4-57E6A1B8C132" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-26cs-2ncd_dfyw"><intent_id>733774</intent_id><project_id>770487</project_id><text_data>Filed by Cheri BryantProject is exempt from State Prevailing Wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2015-12-02T00:00:00</comment_date></row><row _id="row-v3j2~ady7-5x6y" _uuid="00000000-0000-0000-1A5D-457F472F68D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3j2~ady7-5x6y"><intent_id>1289575</intent_id><project_id>1041937</project_id><text_data>We pay 100% Employee Health Premiums as part of Fringe //CC</text_data><comment_date>2022-12-13T00:00:00</comment_date></row><row _id="row-rnnf.sa3b~genb" _uuid="00000000-0000-0000-21B8-DC071CF45862" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rnnf.sa3b~genb"><intent_id>484797</intent_id><project_id>676654</project_id><text_data>1511224</text_data><comment_date>2011-10-20T00:00:00</comment_date></row><row _id="row-c4a3.67v6_msga" _uuid="00000000-0000-0000-7F59-2A9929AD25D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c4a3.67v6_msga"><intent_id>1266893</intent_id><project_id>1031201</project_id><text_data>Repair Liner as needed</text_data><comment_date>2022-09-15T00:00:00</comment_date></row><row _id="row-vsm5_dma9-dn2m" _uuid="00000000-0000-0000-0FBF-43A9614564D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vsm5_dma9-dn2m"><intent_id>904919</intent_id><project_id>847055</project_id><text_data>MAria Gaytan2202 Englewood Ave.Yakima, wA 98901</text_data><comment_date>2018-05-15T00:00:00</comment_date></row><row _id="row-3c58-ysva_scfr" _uuid="00000000-0000-0000-7EDA-9E6ADEB1E9EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3c58-ysva_scfr"><intent_id>949743</intent_id><project_id>868224</project_id><text_data>Prime Job # 1001690</text_data><comment_date>2018-12-07T00:00:00</comment_date></row><row _id="row-tzix.nfif.5a2u" _uuid="00000000-0000-0000-D70B-EE83247CBA2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzix.nfif.5a2u"><intent_id>839174</intent_id><project_id>817538</project_id><text_data>We are a water treatment company. We provide on-site treatment of contaminated waters coming off of a job site, construction, etc. Typically, the equipment is setup on the job site and then we provide occasional service for troubleshooting, monitoring/testing water quality and maintaining the equipment. The equipment monitoring can happen both on-site and remotely.Typical tools we use are:-pipe wrench-screwdrivers-crescent wrench-handheld water quality equipment-etc�Typical process that they would perform are:-Adding Water Treatment Chemicals-Moving Sand bags-Mobilization-Demobilization-Water quality testing-Sample collection-Hydraulic pump repair-Pressurized filter vessel troubleshooting and repairFord or Dodge pickups</text_data><comment_date>2017-07-10T00:00:00</comment_date></row><row _id="row-dchd~7u3t-wip2" _uuid="00000000-0000-0000-2C82-F3789896B55F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dchd~7u3t-wip2"><intent_id>1061424</intent_id><project_id>920614</project_id><text_data>38248</text_data><comment_date>2020-05-29T00:00:00</comment_date></row><row _id="row-azb9-yptu-brtc" _uuid="00000000-0000-0000-6E53-1285B12E5CC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-azb9-yptu-brtc"><intent_id>1231373</intent_id><project_id>967056</project_id><text_data>We are hiring Speer Taps as a sub tier contract. Their UBI is 600491975.</text_data><comment_date>2022-05-05T00:00:00</comment_date></row><row _id="row-epkj_eunj-zrme" _uuid="00000000-0000-0000-E79E-B152D78C937A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-epkj_eunj-zrme"><intent_id>760511</intent_id><project_id>790328</project_id><text_data>Fringe BreakdownLABORERS:  $11.23H &amp; W   = $6.10Pension = $4.50Training= $0.55Trust     = $0.08OPERATORS:  $13.55H &amp; W   = $6.15Pension = $6.75Training= $0.65TEAMSTERS:  $16.69H &amp; W   = $9.84Pension = $6.60Training= $0.25</text_data><comment_date>2016-05-05T00:00:00</comment_date></row><row _id="row-dpsv.e227_8ds3" _uuid="00000000-0000-0000-09E1-8EB4CAC279B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpsv.e227_8ds3"><intent_id>1079634</intent_id><project_id>928808</project_id><text_data>Invoice #125063 drain cleaning</text_data><comment_date>2020-08-12T00:00:00</comment_date></row><row _id="row-57si~5n2p.hib9" _uuid="00000000-0000-0000-D45F-717AAC4ADECE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-57si~5n2p.hib9"><intent_id>551447</intent_id><project_id>701762</project_id><text_data>From: Shanell Roybal [mailto:nelly3dust@yahoo.com] Sent: Thursday, January 10, 2013 3:17 PMTo: Schott, Desiree (LNI)Subject: att: Desiree SchottThe hiring contractor is Linoleum &amp; Carpet CityRegistration  # LINOLCC 16406UBI # 600330902     Thank you,    Dustin Schmehl    One Time FLoor Covering</text_data><comment_date>2013-01-10T00:00:00</comment_date></row><row _id="row-3nxg-xrh4-jwq5" _uuid="00000000-0000-0000-CA57-C33D754B9E16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3nxg-xrh4-jwq5"><intent_id>1321604</intent_id><project_id>1064549</project_id><text_data>Other truck Morooka 2200VDR 19'8' 35273lbs offroad material movement</text_data><comment_date>2023-04-27T00:00:00</comment_date></row><row _id="row-jndi_maec~9fqn" _uuid="00000000-0000-0000-A0C6-F8CF71F772B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jndi_maec~9fqn"><intent_id>1096313</intent_id><project_id>936473</project_id><text_data>We will be removing 2 Maple trees at Sylvester Park. We will be cutting down the trees, chipping up the branches, raking up the rest of the tree debris, and, if necessary leaf blow the parking lot to make the area presentable.</text_data><comment_date>2020-10-15T00:00:00</comment_date></row><row _id="row-kpaw.rqq3-v3vz" _uuid="00000000-0000-0000-0745-6420EDBA6D2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kpaw.rqq3-v3vz"><intent_id>784031</intent_id><project_id>800449</project_id><text_data>The scope of work for this project is to provide and install CAT6 cabling for voice and data.  The data is for desktop computers. All work will be performed inside.</text_data><comment_date>2016-08-22T00:00:00</comment_date></row><row _id="row-5edb_q247-rymn" _uuid="00000000-0000-0000-65FB-3958A09F212F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5edb_q247-rymn"><intent_id>816087</intent_id><project_id>811947</project_id><text_data>Filed by Robert Nemnich.</text_data><comment_date>2017-02-15T00:00:00</comment_date></row><row _id="row-bvq7~xp57.k7b8" _uuid="00000000-0000-0000-EDF9-CBF6AF2E40F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bvq7~xp57.k7b8"><intent_id>628985</intent_id><project_id>734715</project_id><text_data>General labor - assist with site clean upTruck Driver - Water truck for dust control and mobilization of equipment</text_data><comment_date>2014-05-09T00:00:00</comment_date></row><row _id="row-3fk4.cuxj~itjr" _uuid="00000000-0000-0000-5846-062A5BF7E25E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3fk4.cuxj~itjr"><intent_id>790565</intent_id><project_id>797059</project_id><text_data>HIRED BY SUB MALCOLM DRILLING</text_data><comment_date>2016-09-20T00:00:00</comment_date></row><row _id="row-tfcm~wdy8-bx9c" _uuid="00000000-0000-0000-A9BF-0A982792E088" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tfcm~wdy8-bx9c"><intent_id>586105</intent_id><project_id>717215</project_id><text_data>We pulled telecommunication cable between the MDF and station end inside the building</text_data><comment_date>2013-08-15T00:00:00</comment_date></row><row _id="row-y69w.j9j5~js2c" _uuid="00000000-0000-0000-A109-FD20D5F0F641" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y69w.j9j5~js2c"><intent_id>699843</intent_id><project_id>761514</project_id><text_data>This intent is to replace intent #696211.  The owner did not do the work.</text_data><comment_date>2015-06-10T00:00:00</comment_date></row><row _id="row-9brb~xr54~rgak" _uuid="00000000-0000-0000-D08C-27D37523E7A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9brb~xr54~rgak"><intent_id>1122224</intent_id><project_id>946358</project_id><text_data>Fringe breakoutHealth 6.5Pension 4.54</text_data><comment_date>2021-02-14T00:00:00</comment_date></row><row _id="row-jcym.x7c8-qbwq" _uuid="00000000-0000-0000-902C-BE85DBF5F7CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jcym.x7c8-qbwq"><intent_id>915205</intent_id><project_id>854851</project_id><text_data>Miscellaneous pruning</text_data><comment_date>2018-06-30T00:00:00</comment_date></row><row _id="row-58tu.beky-9n26" _uuid="00000000-0000-0000-B59C-BC211AAF3D73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-58tu.beky-9n26"><intent_id>817066</intent_id><project_id>812912</project_id><text_data>Fringe Benefits:Medical:  $1.30Dental:  $.15401K:  $2.00</text_data><comment_date>2017-02-21T00:00:00</comment_date></row><row _id="row-8stn.gwd4~hv3i" _uuid="00000000-0000-0000-B732-AE68CF4B5319" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8stn.gwd4~hv3i"><intent_id>1271760</intent_id><project_id>971308</project_id><text_data>#1-Installation of gypcrete underlayment and sound mat #2-Apartments #3-2 or 3 stories #4 a-no b-no c-yes d-no e-no f-n g-no h-no i-no j-no k-no l-no #5-yes #6-Yes #7-Yes #8-No</text_data><comment_date>2022-10-04T00:00:00</comment_date></row><row _id="row-nmvi~mu94~2yi7" _uuid="00000000-0000-0000-BC31-CD5DC2F1F872" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nmvi~mu94~2yi7"><intent_id>812699</intent_id><project_id>791666</project_id><text_data>Hydroseeding for beautification purpose</text_data><comment_date>2017-01-25T00:00:00</comment_date></row><row _id="row-n62y_s4zp_rzs9" _uuid="00000000-0000-0000-22F5-AE9219999A91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n62y_s4zp_rzs9"><intent_id>952894</intent_id><project_id>869695</project_id><text_data>WO #9529271</text_data><comment_date>2019-01-02T00:00:00</comment_date></row><row _id="row-a6jw-ygph.kbrc" _uuid="00000000-0000-0000-7392-2359BD7AEAEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a6jw-ygph.kbrc"><intent_id>750916</intent_id><project_id>787009</project_id><text_data>This is a Federal Aid project that has both State and Federal Wages.</text_data><comment_date>2016-03-10T00:00:00</comment_date></row><row _id="row-wk9b.pvc9_cdck" _uuid="00000000-0000-0000-3128-EC227916B4D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wk9b.pvc9_cdck"><intent_id>619389</intent_id><project_id>730526</project_id><text_data>Several manufactured homes within the San Souci MHP		#1 - Heating duct sealing. #2 - Single family manufactured home? #3 - 1 level? #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - Unknown #8 - No</text_data><comment_date>2014-03-10T00:00:00</comment_date></row><row _id="row-taax~83ca.9bh5" _uuid="00000000-0000-0000-38C3-6E8C56A9C734" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-taax~83ca.9bh5"><intent_id>1275918</intent_id><project_id>1036045</project_id><text_data>INV # 89218996 SR # 53038102</text_data><comment_date>2022-10-18T00:00:00</comment_date></row><row _id="row-zwxz_ceei_tqns" _uuid="00000000-0000-0000-DAF3-E17DEF8A7366" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zwxz_ceei_tqns"><intent_id>1151861</intent_id><project_id>966285</project_id><text_data>S/O 210318-0005</text_data><comment_date>2021-06-11T00:00:00</comment_date></row><row _id="row-djkj_8sjy.yuvm" _uuid="00000000-0000-0000-E0BB-4DD0A1895A55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-djkj_8sjy.yuvm"><intent_id>688882</intent_id><project_id>758534</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-04-14T00:00:00</comment_date></row><row _id="row-ntth-57x7_t5zu" _uuid="00000000-0000-0000-5A3A-FBFED46C79AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ntth-57x7_t5zu"><intent_id>981474</intent_id><project_id>882707</project_id><text_data>CONTRACTOR UBI 603473-251-1-1</text_data><comment_date>2019-05-31T00:00:00</comment_date></row><row _id="row-5vi4_3649.tq7v" _uuid="00000000-0000-0000-5520-25B203E83DD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vi4_3649.tq7v"><intent_id>1188047</intent_id><project_id>985093</project_id><text_data>LAN(Local Area Network)Bits and BytesTelephoneWire new wapsinside workelect tech(06)</text_data><comment_date>2021-10-25T00:00:00</comment_date></row><row _id="row-ppzm_quvi_e3zw" _uuid="00000000-0000-0000-6A83-A6C7F8F06F21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ppzm_quvi_e3zw"><intent_id>1018252</intent_id><project_id>898039</project_id><comment_date>2019-10-28T00:00:00</comment_date></row><row _id="row-4tgn.v72h_himb" _uuid="00000000-0000-0000-C853-2319B55051A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4tgn.v72h_himb"><intent_id>751828</intent_id><project_id>787411</project_id><text_data>Restripe running track</text_data><comment_date>2016-03-16T00:00:00</comment_date></row><row _id="row-gbbe~4qma.7ngx" _uuid="00000000-0000-0000-2044-5AD380971EAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbbe~4qma.7ngx"><intent_id>716186</intent_id><project_id>770594</project_id><text_data>Blairco Job 15-6291</text_data><comment_date>2015-08-24T00:00:00</comment_date></row><row _id="row-stxi.mur2_qaha" _uuid="00000000-0000-0000-5DBD-EF9F346D491B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-stxi.mur2_qaha"><intent_id>514838</intent_id><project_id>688792</project_id><text_data>Filed by Cassandra Liljenwall</text_data><comment_date>2012-06-04T00:00:00</comment_date></row><row _id="row-gx38-j6nb-pb68" _uuid="00000000-0000-0000-B4D2-1B938D0444FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gx38-j6nb-pb68"><intent_id>1126181</intent_id><project_id>952811</project_id><text_data>Project# 02939, Morris, Rebecca, 19625 E Wellesley Ave, Lot 91, Spokane Valley, WA  99027</text_data><comment_date>2021-03-30T00:00:00</comment_date></row><row _id="row-dnjr_hshv.phh4" _uuid="00000000-0000-0000-58B6-F99EA7F1310D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dnjr_hshv.phh4"><intent_id>456440</intent_id><project_id>609628</project_id><text_data>We are an Idaho-based subcontractor. Our industrial insurance is through a private carrier and covers our Idaho employees when they work in Washington.</text_data><comment_date>2011-05-18T00:00:00</comment_date></row><row _id="row-h4yi-h4zd_y8in" _uuid="00000000-0000-0000-EBFD-BB73FFA2A274" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h4yi-h4zd_y8in"><intent_id>1103131</intent_id><project_id>939819</project_id><text_data>Trade - Arbor Culture</text_data><comment_date>2020-11-12T00:00:00</comment_date></row><row _id="row-wuwp_pdj8~vdv4" _uuid="00000000-0000-0000-81D7-120C89B1FA33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wuwp_pdj8~vdv4"><intent_id>625378</intent_id><project_id>733184</project_id><text_data>Cleaning Walls of the Smoke Hut</text_data><comment_date>2014-04-17T00:00:00</comment_date></row><row _id="row-mqwd.c2m2_6yds" _uuid="00000000-0000-0000-5CB4-7B5BA4885B10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mqwd.c2m2_6yds"><intent_id>803992</intent_id><project_id>796143</project_id><text_data>replace bath fan</text_data><comment_date>2016-11-22T00:00:00</comment_date></row><row _id="row-ac2g.ng68-i4tc" _uuid="00000000-0000-0000-DA2D-5759A8C6636D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ac2g.ng68-i4tc"><intent_id>545397</intent_id><project_id>700074</project_id><text_data>Landscape maintenance services include, mowing, blowing and edging, raking and removing leaves, weeding beds.Lawnmowers, weedeaters, leaf blowers, rakes will be used</text_data><comment_date>2012-11-27T00:00:00</comment_date></row><row _id="row-8bv3-shrn.gf3b" _uuid="00000000-0000-0000-6C5F-E73FC5B7673D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8bv3-shrn.gf3b"><intent_id>1012290</intent_id><project_id>879600</project_id><text_data>Scope of work includes landscape irrigation, truf &amp; grass installation and plant installation.  Tools used will include a bobcat skid steer, shovels, picks, rakes, hoes, sod cutters, crimpers cutters and misc hand tools.</text_data><comment_date>2019-10-04T00:00:00</comment_date></row><row _id="row-jwdv_gcrp_kn8x" _uuid="00000000-0000-0000-6B5C-56E6A6E743F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jwdv_gcrp_kn8x"><intent_id>1243982</intent_id><project_id>911709</project_id><text_data>Installing downspouts on buildin</text_data><comment_date>2022-06-24T00:00:00</comment_date></row><row _id="row-ck9n~xhe6~gdjx" _uuid="00000000-0000-0000-62E0-699E0B4D120C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ck9n~xhe6~gdjx"><intent_id>500457</intent_id><project_id>685968</project_id><text_data>Contractor Registration#: 501COCI916MT</text_data><comment_date>2012-04-16T00:00:00</comment_date></row><row _id="row-cwct.h2gr~wzgd" _uuid="00000000-0000-0000-7342-0B7979A7371E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cwct.h2gr~wzgd"><intent_id>1045364</intent_id><project_id>907130</project_id><text_data>1. Install Panosonic bath fan with smart switch. 2. Single Family. 3. Single story. 4a. no. 4b. no. 4c. yes. 4d. no. 4e. no 4f. no 4g. no 4h. no. 4i. no 4j. no 4k. no. i. na. 5. yes. 6. yes. 7. no. 8. No</text_data><comment_date>2020-03-13T00:00:00</comment_date></row><row _id="row-sv3d_mrjw_he53" _uuid="00000000-0000-0000-D464-8368E3E89F1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sv3d_mrjw_he53"><intent_id>951785</intent_id><project_id>869172</project_id><text_data>24x60 1618782</text_data><comment_date>2018-12-20T00:00:00</comment_date></row><row _id="row-6vwi_it6m~7x4s" _uuid="00000000-0000-0000-0503-55A8D5CD2A61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6vwi_it6m~7x4s"><intent_id>1182874</intent_id><project_id>982137</project_id><text_data>Irrigation line repair at Medical Examiner Building</text_data><comment_date>2021-10-04T00:00:00</comment_date></row><row _id="row-3wqc_tr4z-u8mn" _uuid="00000000-0000-0000-4DDA-1543A3FAB386" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3wqc_tr4z-u8mn"><intent_id>588458</intent_id><project_id>717371</project_id><text_data>This intent is only for Franklyn Elementary Portable - A separate Intent# 588438 was filed for Harney Elem Portables)General Contractor (Hanson Construction Co Inc) UBI#: 601656624Hiring Contractor (Advanced Electric Inc)UBI#: 601983371Our (SimplexGrinnell)UBI#: 60211334</text_data><comment_date>2013-08-19T00:00:00</comment_date></row><row _id="row-gycf-7izq-q6qf" _uuid="00000000-0000-0000-2E99-5A2DA9C9E21A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gycf-7izq-q6qf"><intent_id>834634</intent_id><project_id>821989</project_id><text_data>Manufacture precast concrete restroom building in our Spokane production facility and deliver to site.</text_data><comment_date>2017-05-17T00:00:00</comment_date></row><row _id="row-9x56_xdi7-fefk" _uuid="00000000-0000-0000-D027-0B4247D1E88D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9x56_xdi7-fefk"><intent_id>881026</intent_id><project_id>827392</project_id><text_data>This intent is 1 of 4 intents to replace intent #743156</text_data><comment_date>2017-12-28T00:00:00</comment_date></row><row _id="row-peju_jkzv-q5u2" _uuid="00000000-0000-0000-DCDA-ACC277286810" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-peju_jkzv-q5u2"><intent_id>942029</intent_id><project_id>864964</project_id><text_data>Filing per MJW</text_data><comment_date>2018-10-25T00:00:00</comment_date></row><row _id="row-hj7k.zqh7-r4sc" _uuid="00000000-0000-0000-058E-A974165B6BF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hj7k.zqh7-r4sc"><intent_id>838996</intent_id><project_id>823768</project_id><text_data>Work will be performed in Oldtown, Idaho but the Pend Oreille PUD representative said we are required to pay WA Prevailing Wages for this project</text_data><comment_date>2017-06-07T00:00:00</comment_date></row><row _id="row-abtw-3ikc~wjj9" _uuid="00000000-0000-0000-7C6E-F72194C3AECE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-abtw-3ikc~wjj9"><intent_id>644268</intent_id><project_id>740464</project_id><text_data>Workers Keith Burrell and Mike Poe. 1.Weatherization 2. SFR 3.1 4a,b no c,yes d,e,f,g,h,i,j,k no 5,6,7,8 no.</text_data><comment_date>2014-07-29T00:00:00</comment_date></row><row _id="row-c7dx.j925-hc5y" _uuid="00000000-0000-0000-A9B3-8E7CC1DCB5FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c7dx.j925-hc5y"><intent_id>1365719</intent_id><project_id>1075153</project_id><text_data>IBEW LOCAL 76 ELECTRICIAN PER HRJOURNEYMAN $55.14 NEBF                 $  1.65HEALTH &amp; WELFARE $8.50PENSION  $13.93JATC         $   .78LMCC\NEBF\ADM FEE $.1.12</text_data><comment_date>2023-09-21T00:00:00</comment_date></row><row _id="row-xe6k_ysv4-mmyi" _uuid="00000000-0000-0000-B892-274C023E61EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xe6k_ysv4-mmyi"><intent_id>832747</intent_id><project_id>820633</project_id><text_data>1) Intermountain West Insulation was hired to provide weatherization in the form of insulation for this single family home. 2) Single family home. 3) Single story. 4) a)No B)No C)Yes D-K)No 5)Yes 6)Yes 7)No 8) No</text_data><comment_date>2017-05-12T00:00:00</comment_date></row><row _id="row-zn72_37yr_cutb" _uuid="00000000-0000-0000-15B0-A8FDDB9EE5BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zn72_37yr_cutb"><intent_id>889433</intent_id><project_id>822096</project_id><text_data>Supply and install irrigation at a depth no greater than 24&amp;quot; using trencher or mini excavator, supply and install topsoil via skidsteer, plants and topdress by hand rake.</text_data><comment_date>2018-02-21T00:00:00</comment_date></row><row _id="row-uk8m_fan8~k2ib" _uuid="00000000-0000-0000-3E24-F83823A9F959" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uk8m_fan8~k2ib"><intent_id>996716</intent_id><project_id>889118</project_id><text_data>Install cables that can be used for either telephone(Voice over Distance) or data(bitsand bytes) connection within the telecommunications system. All work to be performedindoors.</text_data><comment_date>2019-08-16T00:00:00</comment_date></row><row _id="row-eiey_urjp.cijk" _uuid="00000000-0000-0000-5956-673A1416C4DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eiey_urjp.cijk"><intent_id>1323125</intent_id><project_id>1065430</project_id><text_data>DWS PVW Ref # WA-640</text_data><comment_date>2023-04-27T00:00:00</comment_date></row><row _id="row-hqag-ubwh.9ych" _uuid="00000000-0000-0000-217F-F66332FC15B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hqag-ubwh.9ych"><intent_id>821703</intent_id><project_id>814106</project_id><text_data>The entire project will consist of installing new sidewalks and storm drain improvements including concrete curbs, asphalt restoration, block wall construction, sign removal and replacement and adjusting utility structures. Our scope will include the installation of topsoil, bark, root barrier and plants. The topsoil and bark will not exceed 6 inches in depth or be placed with an owner operated conveyor truck. Small hand tools will be used for planting. We will not be installing any subsurface water collection systems.</text_data><comment_date>2017-03-20T00:00:00</comment_date></row><row _id="row-mvxz_zec8.ucmi" _uuid="00000000-0000-0000-EB21-127F58972C46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mvxz_zec8.ucmi"><intent_id>721151</intent_id><project_id>771506</project_id><text_data>Hook up furnace and water heater in both:3138 E. 15th Ave, Spokane, WA 99213709 S. Ralph, Spokane, WA 99202</text_data><comment_date>2015-09-17T00:00:00</comment_date></row><row _id="row-22ei~p642~na8x" _uuid="00000000-0000-0000-D3B8-155C4EA0E925" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22ei~p642~na8x"><intent_id>602170</intent_id><project_id>723023</project_id><text_data>10/30/2013 - LR JOB #3612</text_data><comment_date>2013-10-30T00:00:00</comment_date></row><row _id="row-ea4a-3rnm-94nz" _uuid="00000000-0000-0000-61DB-EE8EA73DEC30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ea4a-3rnm-94nz"><intent_id>933540</intent_id><project_id>817016</project_id><text_data>David Gaylord and Branden Peppar did the install.</text_data><comment_date>2018-09-18T00:00:00</comment_date></row><row _id="row-jx67.gavy.mt4c" _uuid="00000000-0000-0000-FDE1-A75DAFC2FE36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jx67.gavy.mt4c"><intent_id>1267544</intent_id><project_id>1015210</project_id><text_data>Job: 1122105 New Intent</text_data><comment_date>2022-09-19T00:00:00</comment_date></row><row _id="row-ani8-ngwz-f6gc" _uuid="00000000-0000-0000-0E09-70359F604150" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ani8-ngwz-f6gc"><intent_id>753406</intent_id><project_id>777605</project_id><text_data>State of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- Evergreen Health Cardiac Rehab Remodel/Green Basement Print Shop and Lounge Prevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?Remodel 2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.) Does this project entail the remodeling or new construction of a facility?Yes but not performed by Siemens.4.) If your firm is working upon a type of building system, what type of system is involved? HVAC 5.) What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.-- On 3/25/2016 by keju235:--8.) Are you going to be hiring any subcontractors for this project?Yes</text_data><comment_date>2016-04-11T00:00:00</comment_date></row><row _id="row-t67a~aaat~8ncr" _uuid="00000000-0000-0000-8FB5-518A0CFADC07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t67a~aaat~8ncr"><intent_id>572196</intent_id><project_id>712080</project_id><text_data>Form filed by: Penni Bean</text_data><comment_date>2013-05-29T00:00:00</comment_date></row><row _id="row-449p-b6m4~24cr" _uuid="00000000-0000-0000-C814-BC3E79F0271A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-449p-b6m4~24cr"><intent_id>1277766</intent_id><project_id>1037031</project_id><text_data>INV # 89190310 SR # 53203010</text_data><comment_date>2022-10-25T00:00:00</comment_date></row><row _id="row-m6xs~s3id.xhp4" _uuid="00000000-0000-0000-BD9D-4A33D35D5901" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6xs~s3id.xhp4"><intent_id>728568</intent_id><project_id>766130</project_id><text_data>Filed by Mike Starbard</text_data><comment_date>2015-10-27T00:00:00</comment_date></row><row _id="row-suxh-8q88~ci5x" _uuid="00000000-0000-0000-6E7C-6146E91CBFFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-suxh-8q88~ci5x"><intent_id>632680</intent_id><project_id>735675</project_id><text_data>Form filed by: Rachel M Sanders</text_data><comment_date>2014-06-02T00:00:00</comment_date></row><row _id="row-5zqm~n47x-syvt" _uuid="00000000-0000-0000-A246-3F2896E9A8F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5zqm~n47x-syvt"><intent_id>1244197</intent_id><project_id>1019346</project_id><text_data>121590-001</text_data><comment_date>2022-06-24T00:00:00</comment_date></row><row _id="row-h7tn.x2hs-e4ns" _uuid="00000000-0000-0000-EA8E-FB9371137480" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h7tn.x2hs-e4ns"><intent_id>1006085</intent_id><project_id>888245</project_id><text_data>This project is federally funded &amp; also subject to Davis Bacon wages, the contractor is paying the higher of the two wage rates.</text_data><comment_date>2019-09-10T00:00:00</comment_date></row><row _id="row-7w87-ye49-9wm3" _uuid="00000000-0000-0000-2C9F-E7C0516901B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7w87-ye49-9wm3"><intent_id>1275994</intent_id><project_id>1026795</project_id><text_data>PPC #22304</text_data><comment_date>2022-10-19T00:00:00</comment_date></row><row _id="row-cf79.fqgd~gtkn" _uuid="00000000-0000-0000-7783-D20E01CC1F88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cf79.fqgd~gtkn"><intent_id>1110259</intent_id><project_id>943772</project_id><text_data>Prime Job# 3001828</text_data><comment_date>2020-12-16T00:00:00</comment_date></row><row _id="row-dfch_6cvd-p5qz" _uuid="00000000-0000-0000-6895-6A4B3D51F184" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfch_6cvd-p5qz"><intent_id>1219268</intent_id><project_id>1003159</project_id><text_data>Other Truck is a semi truck with a roll off bin</text_data><comment_date>2022-03-21T00:00:00</comment_date></row><row _id="row-9jj9_mz92.neez" _uuid="00000000-0000-0000-07F9-E3392E31E339" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9jj9_mz92.neez"><intent_id>487123</intent_id><project_id>677472</project_id><text_data>We have examined our fringe rate and confirm it includes only benefits allowable under WAC 296-127-014. The fringes include only the following:  an employer provided health plan, employer-paid life insurance, actual used vacation (not accrued), holidays, and contributions to the trust associated with an IRS-approved, trustee-managed ERISA pension plan. Hourly fringe benefits consist of $3.50 Medical, $0.25 Life, $0.75 Vacation, $0.50 Holiday and the remaining to Pension.</text_data><comment_date>2011-11-02T00:00:00</comment_date></row><row _id="row-xyr4.j2yf-vbia" _uuid="00000000-0000-0000-54E6-C3F6E2506869" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xyr4.j2yf-vbia"><intent_id>509809</intent_id><project_id>682506</project_id><text_data>33503 NE 30th Ave., Lacenter Wa</text_data><comment_date>2012-04-30T00:00:00</comment_date></row><row _id="row-94uz.xmvv.966y" _uuid="00000000-0000-0000-23F6-26AF2B2B1B58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-94uz.xmvv.966y"><intent_id>807321</intent_id><project_id>809431</project_id><text_data>14 Voice cables for Phones, 16 data cables for Desktop Computers, InsideAlso covers contract: SWR1287_A_WOID258227Job #27756</text_data><comment_date>2016-12-15T00:00:00</comment_date></row><row _id="row-qgj3-x4s2.ts2n" _uuid="00000000-0000-0000-DD51-F683E2120CD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qgj3-x4s2.ts2n"><intent_id>1128422</intent_id><project_id>935577</project_id><text_data>L2 Job No. 201201?</text_data><comment_date>2021-03-12T00:00:00</comment_date></row><row _id="row-gqjp.x566.6e6e" _uuid="00000000-0000-0000-8D44-5522CB4CB8BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqjp.x566.6e6e"><intent_id>466335</intent_id><project_id>601242</project_id><text_data>Other Trucks - Water Truck (8,000-14,000 gallons) to provide water for grinding operation.</text_data><comment_date>2011-07-18T00:00:00</comment_date></row><row _id="row-98q8-pyzp_5rwd" _uuid="00000000-0000-0000-05EF-F8E9B6F26B04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-98q8-pyzp_5rwd"><intent_id>616005</intent_id><project_id>722882</project_id><text_data>1. Installation and repair of HVAC system 2. Family housing 3. 3 stories 4. (A,b,d,e,f,g,h,i) no (c,j) yes (k) n/a 5. yes 6. yes 7. unknown 8.no</text_data><comment_date>2014-02-12T00:00:00</comment_date></row><row _id="row-4j3b_9bwm~4wku" _uuid="00000000-0000-0000-742B-E4380D1C6E70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4j3b_9bwm~4wku"><intent_id>1085080</intent_id><project_id>931287</project_id><text_data>JCFP has Industrial Insurance</text_data><comment_date>2020-09-01T00:00:00</comment_date></row><row _id="row-aeh2.jsf2~cn8s" _uuid="00000000-0000-0000-5143-05884342469D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aeh2.jsf2~cn8s"><intent_id>1366336</intent_id><project_id>1088745</project_id><text_data>9924744</text_data><comment_date>2023-09-23T00:00:00</comment_date></row><row _id="row-8dvr~wy93.tdm9" _uuid="00000000-0000-0000-C079-FFC2CC3143EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8dvr~wy93.tdm9"><intent_id>1052644</intent_id><project_id>916322</project_id><comment_date>2020-04-20T00:00:00</comment_date></row><row _id="row-wh5f.rmqj_8ckp" _uuid="00000000-0000-0000-94F3-667B75D0B23E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wh5f.rmqj_8ckp"><intent_id>608446</intent_id><project_id>722118</project_id><text_data>Install irrigation system to a maximum depth of 3� below finished grade. Trench for irrigation system to a maximum depth of 3� below finished grade.  Install plants, trees, shrubs.  Spread topsoil, mulch or bark to plant beds.  Equipment to be used, bobcat under 75hp and misc. small hand tools.</text_data><comment_date>2013-12-13T00:00:00</comment_date></row><row _id="row-f97q~rfis-eimv" _uuid="00000000-0000-0000-A166-9576A5BB1D77" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f97q~rfis-eimv"><intent_id>542407</intent_id><project_id>697607</project_id><text_data>We will be installing permeable landscape pavers only.  Prime contractor is excavating for base material, installing all necessary gravel products for the base material and fine grading in preparation for the installation of the landscape pavers.  These are layed directy on a gravel base and no concrete/mortor or mason work is involved in this project.</text_data><comment_date>2012-10-31T00:00:00</comment_date></row><row _id="row-5t75-8pxy~ff5k" _uuid="00000000-0000-0000-0DEA-778681BB7EDE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5t75-8pxy~ff5k"><intent_id>784020</intent_id><project_id>800442</project_id><text_data>Filed by Jennifer L. Dillon.</text_data><comment_date>2016-08-22T00:00:00</comment_date></row><row _id="row-iy3c_ue9e-hw4m" _uuid="00000000-0000-0000-9148-BE0B73CEC5C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iy3c_ue9e-hw4m"><intent_id>766385</intent_id><project_id>791941</project_id><text_data>Filed by John Ketola</text_data><comment_date>2016-06-06T00:00:00</comment_date></row><row _id="row-t4ii.vipy-jqww" _uuid="00000000-0000-0000-819F-B91EB82EBCAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t4ii.vipy-jqww"><intent_id>496870</intent_id><project_id>665650</project_id><text_data>Filed By: Donna J. Doescher</text_data><comment_date>2012-01-13T00:00:00</comment_date></row><row _id="row-mza6_ejx3_6ieg" _uuid="00000000-0000-0000-5E6B-2DE6A49AF1CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mza6_ejx3_6ieg"><intent_id>894622</intent_id><project_id>840261</project_id><text_data>Filed by Derek Laspisa</text_data><comment_date>2018-03-23T00:00:00</comment_date></row><row _id="row-5qae.45xe-s3dc" _uuid="00000000-0000-0000-C7BF-8177D5DBC6EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5qae.45xe-s3dc"><intent_id>1194739</intent_id><project_id>984721</project_id><text_data>1. Install Panosonic bath fan with smart switch. 2. Single Family. 3. Single story. 4a. no. 4b. no. 4c. yes. 4d. no. 4e. no 4f. no 4g. no 4h. no. 4i. no 4j. no 4k. no. i. na. 5. yes. 6. yes. 7. no. 8. No</text_data><comment_date>2021-11-22T00:00:00</comment_date></row><row _id="row-28wi~5i2a.97gt" _uuid="00000000-0000-0000-93B4-239E3F3C9C51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-28wi~5i2a.97gt"><intent_id>1199729</intent_id><project_id>992059</project_id><text_data>9879704</text_data><comment_date>2021-12-15T00:00:00</comment_date></row><row _id="row-cjuy-kzvp.nvew" _uuid="00000000-0000-0000-7CC3-D22AF3FFC533" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjuy-kzvp.nvew"><intent_id>570678</intent_id><project_id>711457</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. � Maintenance Painting of various exterior surfaces.  #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? - Apartment.  #3 - Including any basement or garage, how many stories or levels does the structure have? � 2 Levels.  #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: A. No (b.)No (c.)Yes (d.)No (e.)No (f) No (g.) No (h.) no (i) No (J) no (k.) No.  #5 - Does each dwelling unit have its own self-contained kitchen? Unknown.  #6 - Does each dwelling unit have its own bathroom? Unknown.  #7 - Is there a community facility or manager�s office on site? Unknown.  #8 - Is any part of the structure used by members of the public? No.</text_data><comment_date>2013-05-29T00:00:00</comment_date></row><row _id="row-g9vc-qc8d-7ntk" _uuid="00000000-0000-0000-617C-8BB0D1A76093" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g9vc-qc8d-7ntk"><intent_id>757054</intent_id><project_id>789754</project_id><text_data>1)We were contracted to tune and repair the furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2016-04-18T00:00:00</comment_date></row><row _id="row-5hxv.i383-g9ma" _uuid="00000000-0000-0000-32FC-4A4B460F9AB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5hxv.i383-g9ma"><intent_id>483266</intent_id><project_id>675780</project_id><text_data>-- On 10/5/2011:--THERE ARE 55 UNITS IN THIS PACKAGE INCLUDING 1 - 4 PLEX AND 1 - TRIPLEX AND 48 SINGLE FAMILY DWELLINGS. THEY VARY FROM 1 FLOOR TO 2 FLOORS. THE BUILDINGS ARE PERMANENT FAMILY RESIDENCES AND EACH HAVE A SELF CONTAINED KITCHEN. THEY EACH HAVE A BATHROOM. THERE IS NO MANAGER'S OFFICE ON SITE IN THE MULTI FAMILY UNITS.-- On 10/5/2011:--NO PART OF THE FACILITIES ARE USED BY MEMBERS OF THE PUBLIC.-- On 10/11/2011:--Per Tony at King County, this is a NOISE REMEDY project, which is residential. (chrr235)</text_data><comment_date>2011-10-12T00:00:00</comment_date></row><row _id="row-x8d4-myri.i9qn" _uuid="00000000-0000-0000-BFBC-F40DB9155200" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x8d4-myri.i9qn"><intent_id>792637</intent_id><project_id>802729</project_id><text_data>Emergency After Hours Project</text_data><comment_date>2016-10-04T00:00:00</comment_date></row><row _id="row-n27b.gvbk.ci3z" _uuid="00000000-0000-0000-86A3-7DF36CE6470B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n27b.gvbk.ci3z"><intent_id>1128872</intent_id><project_id>954335</project_id><text_data>Labor done on SRO 1911652</text_data><comment_date>2021-03-15T00:00:00</comment_date></row><row _id="row-uwnj.u4jt~tjdy" _uuid="00000000-0000-0000-116D-E35AC4CB0A51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwnj.u4jt~tjdy"><intent_id>900055</intent_id><project_id>848941</project_id><text_data>REPLACE REGULATOR AND TUNE BOILER #2</text_data><comment_date>2018-04-23T00:00:00</comment_date></row><row _id="row-eu7c_n2we.34ke" _uuid="00000000-0000-0000-AB36-38F249788265" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eu7c_n2we.34ke"><intent_id>825619</intent_id><project_id>817709</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborers Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2017-04-10T00:00:00</comment_date></row><row _id="row-wa9i-7vrw.ekxt" _uuid="00000000-0000-0000-53B8-CAC51F5EA338" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wa9i-7vrw.ekxt"><intent_id>1014260</intent_id><project_id>895703</project_id><text_data>Hour</text_data><comment_date>2019-10-10T00:00:00</comment_date></row><row _id="row-xjnb-hmqg.mib7" _uuid="00000000-0000-0000-7209-62AC79FF8231" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xjnb-hmqg.mib7"><intent_id>1178352</intent_id><project_id>974557</project_id><text_data>sweeping using a truck mounted sweeper.</text_data><comment_date>2021-09-16T00:00:00</comment_date></row><row _id="row-aafx~mqk3.ksp5" _uuid="00000000-0000-0000-6683-07F5DEB92347" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aafx~mqk3.ksp5"><intent_id>1026158</intent_id><project_id>901656</project_id><text_data>Repair # 724486 Eve</text_data><comment_date>2019-12-11T00:00:00</comment_date></row><row _id="row-d8y6_4fz9-z3ii" _uuid="00000000-0000-0000-1A16-3130C2C01966" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d8y6_4fz9-z3ii"><intent_id>1122561</intent_id><project_id>950672</project_id><text_data>#1-repair gas furnace; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2021-02-16T00:00:00</comment_date></row><row _id="row-a2dk.fkbg-rwkn" _uuid="00000000-0000-0000-63DA-78308DD2CE8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a2dk.fkbg-rwkn"><intent_id>975953</intent_id><project_id>880325</project_id><text_data>FILED BY THOMAS C. RIENER</text_data><comment_date>2019-05-06T00:00:00</comment_date></row><row _id="row-9w38-2zg6~zua3" _uuid="00000000-0000-0000-9AAA-D3810A217E55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9w38-2zg6~zua3"><intent_id>1258379</intent_id><project_id>1026675</project_id><text_data>Yew Rd. #K5, Bellingham, WA 982291. Air seal, duct seal, belly blow, mechanical ventilation   2. Single family     3. 1     4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No    5. Yes     6. Yes     7. No     8. No</text_data><comment_date>2022-08-16T00:00:00</comment_date></row><row _id="row-5w3h-w49c_mfye" _uuid="00000000-0000-0000-1710-3B37CA11DBE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5w3h-w49c_mfye"><intent_id>1272694</intent_id><project_id>1034309</project_id><text_data>This project does not include constructing a footpath or trail, nor does it involve building or installing stairs. This project involves repairing existing �stairs� in paths in two urban parks and repairing a small section of a handrail. In this case the �stairs� are dirt and gravel paths with landscape timbers serving as �treads.� However, we are not disputing your determination and have filed corrections to pay Carpenter and Laborer (Carpenter Tender) rates. The majority of the work on this project will involve moving new landscape timbers to the path, moving the dirt and gravel from the path and removing the existing landscape timbers that have rotten, placing and leveling the new timbers on the ground, and then moving the dirt and gravel back into the path. We intend to pay the workers performing this work as Laborers/Carpenter Tenders. The workers that repair the handrail and cut the landscape timbers will be paid as Carpenters.</text_data><comment_date>2022-11-18T00:00:00</comment_date></row><row _id="row-bze8~gbjw_c3ws" _uuid="00000000-0000-0000-5390-DCA764DE8E90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bze8~gbjw_c3ws"><intent_id>1260711</intent_id><project_id>1025068</project_id><text_data>#27092</text_data><comment_date>2022-08-23T00:00:00</comment_date></row><row _id="row-yejr-n42u.6d4i" _uuid="00000000-0000-0000-5DCC-C540B891B8E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yejr-n42u.6d4i"><intent_id>746197</intent_id><project_id>782813</project_id><text_data>This project is a new school addition with our scope of work being the installation of underground sprinkler system which includes the use of a mini-excavator and a ditch witch to do the installation at depths of 3 feet or less.  We will also be planting trees, shrubs and sod/seed.  The majority of our work will consist of general labor with rakes and shovels. The installation of mulch in all the shrub beds will be also included</text_data><comment_date>2016-02-11T00:00:00</comment_date></row><row _id="row-cddi_49p4~2rpy" _uuid="00000000-0000-0000-CD38-15520C136C0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cddi_49p4~2rpy"><intent_id>757126</intent_id><project_id>777766</project_id><text_data>Plant shrubs, install landscape boulders and hydroseeding using 65hp skid loader, hydroseed trailer, hand tools and wheel barrow.</text_data><comment_date>2016-04-18T00:00:00</comment_date></row><row _id="row-ffaz~kna3_dyez" _uuid="00000000-0000-0000-0959-8C229F2AF399" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ffaz~kna3_dyez"><intent_id>1264043</intent_id><project_id>1029622</project_id><text_data>PC1Job #4386CB</text_data><comment_date>2022-09-06T00:00:00</comment_date></row><row _id="row-ztya~6u2c-cw6b" _uuid="00000000-0000-0000-B19E-7D3C227D42C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ztya~6u2c-cw6b"><intent_id>1366367</intent_id><project_id>1088753</project_id><text_data>9925021</text_data><comment_date>2023-09-23T00:00:00</comment_date></row><row _id="row-xqd9_jxg5~kfhd" _uuid="00000000-0000-0000-F508-EBD5F2265C0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xqd9_jxg5~kfhd"><intent_id>697663</intent_id><project_id>763602</project_id><text_data>04/28/2015#S13-94102-401Alejandra Reyes2105 N Steptoe St #75Kennewick, WA 99336509-528-0821, 509-987-8689 (Juan)05/29/2015#F13-43101-401Betty Neifer839 Guernsy StProsser, WA 99350509-778-339305/19/2015#S13-94102-401Gabriela Murillo4815 W Clearwater Ave #140Kennewick, WA 99336509-440-949105/20/2015#S13-94102-401Luz Sanchez4815 W Clearwater Ave #81Kennewick, WA 99336541-561-2780, 509-430-258705/01/2015#S13-94102-401Maribel Antonio5007 W Clearwater Ave #31Kennewick, WA 99336509-521-6006, 509-440-327205/28/2015#S13-94102-401Patricia Mendoza1416 N 1st Ave #3Pasco, WA 99301509-542-0216, 509-492-8606 Yatzire-DaughterTrue of each of the jobs listed above (In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions in the notes section at the bottom of this screen:)1) Add bathroom fans and timers (provide rigid ducting), some electrical misc. repairs2) Single Family and Mobile Homes (Factory Assembled Structure)3) All are single or two story4a) No4b) No4c) Yes4d) No4e) No4f) No4g) No4h) No4i) No4j) No4k) N/A5) Yes6) Yes7) No8) No</text_data><comment_date>2015-06-01T00:00:00</comment_date></row><row _id="row-b82g.pccv.mbzf" _uuid="00000000-0000-0000-F3FB-A8AE2CEEA206" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b82g.pccv.mbzf"><intent_id>762869</intent_id><project_id>792297</project_id><text_data>Replacement of below grade foundation wall waterproofing at Stacks 6 &amp; 7.</text_data><comment_date>2016-05-18T00:00:00</comment_date></row><row _id="row-jf4a~qib5-bq4f" _uuid="00000000-0000-0000-F67D-B249AA32E8DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jf4a~qib5-bq4f"><intent_id>1128011</intent_id><project_id>953867</project_id><comment_date>2021-03-10T00:00:00</comment_date></row><row _id="row-9aru-pfum.58pr" _uuid="00000000-0000-0000-567D-7A670634EFF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9aru-pfum.58pr"><intent_id>840265</intent_id><project_id>823318</project_id><text_data>0717040</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-g8hv~ndfu-pgaq" _uuid="00000000-0000-0000-D148-BDF1206F3382" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8hv~ndfu-pgaq"><intent_id>988831</intent_id><project_id>876139</project_id><text_data>1119030</text_data><comment_date>2019-07-01T00:00:00</comment_date></row><row _id="row-kiut-yuaj.cuyq" _uuid="00000000-0000-0000-1C86-8E2E30770E42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kiut-yuaj.cuyq"><intent_id>962343</intent_id><project_id>874204</project_id><text_data>FILED BY WENDY BURBIDGE</text_data><comment_date>2019-02-27T00:00:00</comment_date></row><row _id="row-s428_4wi6_dpsz" _uuid="00000000-0000-0000-EF39-838B733C59CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s428_4wi6_dpsz"><intent_id>612208</intent_id><project_id>726601</project_id><text_data>054007</text_data><comment_date>2014-01-15T00:00:00</comment_date></row><row _id="row-psja.ru4v~5y4d" _uuid="00000000-0000-0000-E7BC-340832777779" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-psja.ru4v~5y4d"><intent_id>773745</intent_id><project_id>791245</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirementsProject Site Addresses:EB Wilson Building-1202 South M Street, Tacoma WA 98405 Davis �Bacon (Commercial) Rates                Apply WA150038 3/27/15Fawcett Apartments-3201 Fawcett Ave, Tacoma WA 98418 Davis- Bacon Residential Rates Apply WA150118 3/27/15Wright Street Apartments- 602 South Wright Street, Tacoma WA 98418 Davis-Bacon Residential Rates Apply WA150118 3/27/15K Street Apartments- 911 North K Street, Tacoma WA 98403 Davis-Bacon Residential Rates Apply WA150118 3/27/15Ludwig Apartments-5425 South Lawrence Street, Tacoma WA 98409 Davis-Bacon Residential Rates Apply WA150118 3/27/15G Street Apartments- 401 North G Street Tacoma WA 98225 Davis-Bacon Residential Rates Apply WA150118 3/27/156th Avenue Apartments- 2302 6th Avenue, Tacoma WA 98225 Davis-Bacon Residential Rates Apply WA150118 3/27/15Bergerson Terrace Apartments- 5301 South Orchard, Tacoma WA 98229 Davis-Bacon Residential Rates Apply WA150118 3/27/15Dixon Village- 5401 South Stevens, Tacoma WA 98409 Davis-Bacon Residential Rates Apply WA150118 3/27/15</text_data><comment_date>2016-07-11T00:00:00</comment_date></row><row _id="row-xcud_we8i_v3fi" _uuid="00000000-0000-0000-D493-FE606DA6F3AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xcud_we8i_v3fi"><intent_id>545657</intent_id><project_id>700173</project_id><text_data>Local Pension $8.29 National Pension $1.51 H&amp;W 10.35 Training $1.05 PMCA $.20 Scholarships $.07 Education $.16</text_data><comment_date>2013-07-29T00:00:00</comment_date></row><row _id="row-37bs.d5dd~krna" _uuid="00000000-0000-0000-DBFA-AF3E0D7ED2C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-37bs.d5dd~krna"><intent_id>1176285</intent_id><project_id>932200</project_id><text_data>Herbicide application by truck or gator with roadside sprayer to base rock in preparation for paving. Controls are in vehicle so that the driver sprays while the vehicle moves.</text_data><comment_date>2021-09-09T00:00:00</comment_date></row><row _id="row-9mn9.hbgt-jnzg" _uuid="00000000-0000-0000-A319-575C411C2745" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9mn9.hbgt-jnzg"><intent_id>1117353</intent_id><project_id>943855</project_id><text_data>truck other is drving a non cdl 26K GVW flatbedlandscape labor is planting grass seed</text_data><comment_date>2021-01-25T00:00:00</comment_date></row><row _id="row-z7yd-34p6-i82d" _uuid="00000000-0000-0000-4709-D6FA29AAE6B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7yd-34p6-i82d"><intent_id>1214910</intent_id><project_id>1001611</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. GA2055Filed By Brook</text_data><comment_date>2022-03-02T00:00:00</comment_date></row><row _id="row-w7za-2yi9~xrv6" _uuid="00000000-0000-0000-3141-8E63E5E6FB7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w7za-2yi9~xrv6"><intent_id>643361</intent_id><project_id>740129</project_id><text_data>Our industrial insurance number is 034,061-00</text_data><comment_date>2014-07-25T00:00:00</comment_date></row><row _id="row-52pp.i72b.3w8x" _uuid="00000000-0000-0000-F26C-F0BA6D3CE558" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-52pp.i72b.3w8x"><intent_id>1111363</intent_id><project_id>937114</project_id><text_data>Install security window.</text_data><comment_date>2020-12-22T00:00:00</comment_date></row><row _id="row-6hdd~8f3p-vzw8" _uuid="00000000-0000-0000-EA31-03CBC24ECDDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6hdd~8f3p-vzw8"><intent_id>492348</intent_id><project_id>679471</project_id><text_data>4705 194th St SW, Lynnwood</text_data><comment_date>2011-12-07T00:00:00</comment_date></row><row _id="row-ejj6.3ws7.mhxm" _uuid="00000000-0000-0000-1C24-E268EEF38169" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ejj6.3ws7.mhxm"><intent_id>598791</intent_id><project_id>721789</project_id><text_data>WE WILL BE TOP DRESSING (SPREADING A LAYER OF SAND). THESE PROCESSES HAVE BEEN APPROVED AS FALLING UNDER THE WA LANDSCAPING CODE. WE ARE IN OREGON, AND WE HAVE THE RECIPRICAL AGREEMENT WITH WASHINGTON FOR WORKERS COMP</text_data><comment_date>2013-10-10T00:00:00</comment_date></row><row _id="row-nz6h.zngg-gbg9" _uuid="00000000-0000-0000-A312-7AC42E203E7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nz6h.zngg-gbg9"><intent_id>814121</intent_id><project_id>812616</project_id><text_data>WO 310189INV SM 195270-214</text_data><comment_date>2017-02-02T00:00:00</comment_date></row><row _id="row-er9i.sds6-s9zg" _uuid="00000000-0000-0000-A1FB-947774C44C0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-er9i.sds6-s9zg"><intent_id>1183227</intent_id><project_id>982348</project_id><text_data>Fringes: Vacation $5.50, Assessment $1.30, Insurance $9.01, Pension $16.79, Training $2.08, Industry Improvement $.50</text_data><comment_date>2021-10-05T00:00:00</comment_date></row><row _id="row-qnsy~c727~ky68" _uuid="00000000-0000-0000-0218-10513FE24670" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qnsy~c727~ky68"><intent_id>572761</intent_id><project_id>676228</project_id><text_data>I am the owner operator and a journeyman. The only employee that I will have on this project is an apprentice.</text_data><comment_date>2013-06-02T00:00:00</comment_date></row><row _id="row-5y45-8deg_ebf8" _uuid="00000000-0000-0000-A22C-397F268CD643" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5y45-8deg_ebf8"><intent_id>582624</intent_id><project_id>712666</project_id><text_data>We will have our pump truck there keeping thee sewer empty while Stremler Gravel replaces a sewer line.</text_data><comment_date>2013-07-22T00:00:00</comment_date></row><row _id="row-8zju~n6kn_z9e9" _uuid="00000000-0000-0000-2DE3-C5214583ABA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zju~n6kn_z9e9"><intent_id>637976</intent_id><project_id>737901</project_id><text_data>Form filed by: Martin Zapata</text_data><comment_date>2014-06-27T00:00:00</comment_date></row><row _id="row-7rh3_3neu-gi6u" _uuid="00000000-0000-0000-EA4C-4E9F5FFFD22B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7rh3_3neu-gi6u"><intent_id>668378</intent_id><project_id>738896</project_id><text_data>1. construction labor support to construct the building 2.apartments 3.four stories 4.a yes, if facility administrative offices count as commercial use b no c yes d no, no e no f no g no h no i there are some services provided to residents only j yes k n/a 5. yes 6. yes 7. yes 8. no</text_data><comment_date>2014-12-04T00:00:00</comment_date></row><row _id="row-x46g_vuf9_5m7g" _uuid="00000000-0000-0000-382C-04A44573264B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x46g_vuf9_5m7g"><intent_id>1065547</intent_id><project_id>917210</project_id><text_data>Tymco 600 sweeper unit on International or freightliner chassis</text_data><comment_date>2020-06-16T00:00:00</comment_date></row><row _id="row-c9mq-5zt8-2mj9" _uuid="00000000-0000-0000-08E6-8AA63CE3CC53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9mq-5zt8-2mj9"><intent_id>954359</intent_id><project_id>858688</project_id><text_data>Irrigation or Lawn Sprinkler Installers � Lawn sprinkler instillation, modification and adjustmentsLandscaping or Planting Laborers � Lawn and landscape instillation, modification and adjustment Landscape Equipment Operator � Power equipment less than 90 horsepower</text_data><comment_date>2019-01-10T00:00:00</comment_date></row><row _id="row-5iyu.76cq_cnwt" _uuid="00000000-0000-0000-D051-3EA0AD2D2710" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5iyu.76cq_cnwt"><intent_id>702038</intent_id><project_id>765363</project_id><text_data>General laborer is meeting trailer and assisting with loading.</text_data><comment_date>2015-06-19T00:00:00</comment_date></row><row _id="row-esxi-br8r~nasy" _uuid="00000000-0000-0000-AF5E-FF35A1543AE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-esxi-br8r~nasy"><intent_id>883946</intent_id><project_id>840027</project_id><text_data>1. Repair two leaks in crawl.2. single family3.14. a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no5. yes6. yes7. noe. no</text_data><comment_date>2018-01-18T00:00:00</comment_date></row><row _id="row-jzf9-n467_9gg5" _uuid="00000000-0000-0000-332F-97C59BEAC834" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzf9-n467_9gg5"><intent_id>930465</intent_id><project_id>860539</project_id><text_data>Filed by Michael Nelson</text_data><comment_date>2018-09-04T00:00:00</comment_date></row><row _id="row-p7ie~5pka-4taw" _uuid="00000000-0000-0000-AE23-A79036CC41BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7ie~5pka-4taw"><intent_id>649110</intent_id><project_id>731356</project_id><text_data>Form filed by: Allen Edmund Potter</text_data><comment_date>2014-08-19T00:00:00</comment_date></row><row _id="row-yyph.j878_ifmk" _uuid="00000000-0000-0000-A2AD-200767783C1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yyph.j878_ifmk"><intent_id>534173</intent_id><project_id>695146</project_id><text_data>2005 C4500 Cab wtih Trailer gross weight 42,000.  used to haul equipment and material to job site.</text_data><comment_date>2012-09-24T00:00:00</comment_date></row><row _id="row-rias_ryba.sruu" _uuid="00000000-0000-0000-3E96-91AA7B64A9B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rias_ryba.sruu"><intent_id>559503</intent_id><project_id>704332</project_id><text_data>Form filed by: Halima Jama Hassein</text_data><comment_date>2013-03-11T00:00:00</comment_date></row><row _id="row-kvdi~umwa.96je" _uuid="00000000-0000-0000-AC84-218BEC0029F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvdi~umwa.96je"><intent_id>1138007</intent_id><project_id>959356</project_id><text_data>42nd Ave S., Seattle, WA 981181. Air seal, and mechanical ventilation 2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. No</text_data><comment_date>2021-04-22T00:00:00</comment_date></row><row _id="row-rzyf.fr7p.ezwq" _uuid="00000000-0000-0000-B1CE-36E24DEAD262" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzyf.fr7p.ezwq"><intent_id>895152</intent_id><project_id>846845</project_id><text_data>1) Install mini split system 3 hot water tank 2) Single family  3) 1 4a) No 4b) No 4c) Yes 4d) No 4e) No 4f) No 4g) No 4h) No 4i) No 4j) No 4k) No 4l) 5) Yes 6) Yes 7) No 8) No</text_data><comment_date>2018-03-27T00:00:00</comment_date></row><row _id="row-c52a~atu4.gpjb" _uuid="00000000-0000-0000-30A4-3179FFE9139E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c52a~atu4.gpjb"><intent_id>889167</intent_id><project_id>837314</project_id><text_data>Truck type: TR (as listed on our WA registration cab card)Truck size: gross weight/combined gross weight 80,000 (as listed on our WA registration cab card)Purpose of truck: deliver material to the jobsite; fabricated structural steel deliveries</text_data><comment_date>2018-02-20T00:00:00</comment_date></row><row _id="row-hstc~gpma-asia" _uuid="00000000-0000-0000-DB46-431FB242655E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hstc~gpma-asia"><intent_id>892197</intent_id><project_id>845050</project_id><text_data>PROJECT REQUIRES ENGINEERED WOOD FIBER MATERIALS TO BE INSTALLED.  WE SUB CONTRACTED AN INSTALLER TO BLOW IN THE MATERIAL.</text_data><comment_date>2018-03-12T00:00:00</comment_date></row><row _id="row-u6rr_f9ah~d9u5" _uuid="00000000-0000-0000-E833-DCC89E4C7DC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u6rr_f9ah~d9u5"><intent_id>615874</intent_id><project_id>728956</project_id><text_data>Fringe BreakdownLABORERS:  $10.71H &amp; W   = $5.70Pension = $4.50Training= $0.45Trust     = $0.06OPERATORS:  $12.85H &amp; W   = $5.55Pension = $6.75Training= $0.55TEAMSTERS:  $15.19H &amp; W   = $9.14Pension = $5.80Training= $0.25</text_data><comment_date>2014-02-11T00:00:00</comment_date></row><row _id="row-krfi.p6a6~7up4" _uuid="00000000-0000-0000-68C4-D436867874C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-krfi.p6a6~7up4"><intent_id>901281</intent_id><project_id>849427</project_id><text_data>1) Install duct system 2) Single family 3) 1 4a) No 4b) No 4c) Yes 4d) No 4e) No 4f) Yes 4g) No 4h) No 4i) No 4j) No 4k) No 4l) 5) No 6) Yes 7) No 8) No</text_data><comment_date>2018-04-27T00:00:00</comment_date></row><row _id="row-heek~ssig.admq" _uuid="00000000-0000-0000-E786-5196343D8FA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-heek~ssig.admq"><intent_id>958983</intent_id><project_id>863186</project_id><text_data>Installation of indoor telephone telecommunications cabling</text_data><comment_date>2019-02-06T00:00:00</comment_date></row><row _id="row-z5wx.nutg.zv3d" _uuid="00000000-0000-0000-09FB-B41057AEE2DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z5wx.nutg.zv3d"><intent_id>693734</intent_id><project_id>759264</project_id><text_data>Form filed by:  Robert Spanjer</text_data><comment_date>2015-05-11T00:00:00</comment_date></row><row _id="row-3q6h_4v5c-fmkq" _uuid="00000000-0000-0000-6DBC-AD3BCB9193A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3q6h_4v5c-fmkq"><intent_id>1144404</intent_id><project_id>962236</project_id><text_data>COB Saddleback Park - Re-mulching in park by hand</text_data><comment_date>2021-05-19T00:00:00</comment_date></row><row _id="row-xs7t-dtzy.qk93" _uuid="00000000-0000-0000-FCB6-2A5C90E3C7FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xs7t-dtzy.qk93"><intent_id>803657</intent_id><project_id>804398</project_id><text_data>Exemption Intent Questionnaire form- MICSE HVAC Design BuildPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?Install New Duct Heater in Gym union and install new heat pump in office space.2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.) Does this project entail the remodeling or new construction of a facility?Yes but not performed by Siemens.4.) If your firm is working upon a type of building system, what type of system is involved? HVAC5.) What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.) Are you going to be hiring any subcontractors for this project?Yes</text_data><comment_date>2016-11-21T00:00:00</comment_date></row><row _id="row-qfe4-ebx4~zqf6" _uuid="00000000-0000-0000-3059-38406A0AE270" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qfe4-ebx4~zqf6"><intent_id>939257</intent_id><project_id>863829</project_id><text_data>Maint 09-01-18 thru Everett</text_data><comment_date>2018-10-11T00:00:00</comment_date></row><row _id="row-6bye_pfyr_udz5" _uuid="00000000-0000-0000-AAD5-B608A1A39C36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6bye_pfyr_udz5"><intent_id>608929</intent_id><project_id>719791</project_id><text_data>WORKERS COMP CARRIER - SAIF CORP, POLICY #947202WE DO NOT HAVE ANY EMPLOYEES THAT ARE RESIDENTS OF WASHINGTON</text_data><comment_date>2013-12-17T00:00:00</comment_date></row><row _id="row-8dis-8xns.aed2" _uuid="00000000-0000-0000-E8A7-99EEDA69E757" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8dis-8xns.aed2"><intent_id>503806</intent_id><project_id>684166</project_id><text_data>PENSION 6.70, HEALTH AND WELFARE 7.63, NEBF (NATIONAL PENSION FUND) 3%, APPRENTICESHIP TRAINING, .30, CAF (ADMIN. MAINT. FUND) .50% OF GROSS. ALL OF THE ABOVE ARE PART OF LOCAL APPRENTICESHIP AND TRUST AGREEMENT.</text_data><comment_date>2012-04-06T00:00:00</comment_date></row><row _id="row-7q5h-6y67.ahwk" _uuid="00000000-0000-0000-BA42-2D8DE0C8C0EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7q5h-6y67.ahwk"><intent_id>813349</intent_id><project_id>807847</project_id><text_data>Journeyman Fringe Package = Ind Acct Pension ($5.50) / Pension ($5.51) / Occ Health ($0.12) / Health ($9.24) / Apprenticeship ($0.50) / Industry Fund ($0.10) / LMCT ($0.05) = $21.02</text_data><comment_date>2017-01-30T00:00:00</comment_date></row><row _id="row-fmw5~pk8q-7edf" _uuid="00000000-0000-0000-C433-BC2803D0082E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fmw5~pk8q-7edf"><intent_id>839258</intent_id><project_id>818703</project_id><text_data>Truck is an F550 used to transport equipment and materials to and form the job site</text_data><comment_date>2017-06-08T00:00:00</comment_date></row><row _id="row-muij-aj7k.bfzm" _uuid="00000000-0000-0000-438E-D1C586A2E8C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-muij-aj7k.bfzm"><intent_id>947095</intent_id><project_id>867055</project_id><text_data>Employees drive either a 2500 or a 3500 Chevy Silverado to and from the job site. This work was annual preventative maintenance, change oil, oil filter, fuel filter, battery inspection and DC voltage reading, 27 point inspection.</text_data><comment_date>2018-11-21T00:00:00</comment_date></row><row _id="row-et6g-kb26_spyc" _uuid="00000000-0000-0000-CC10-9C2C613F91E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-et6g-kb26_spyc"><intent_id>975519</intent_id><project_id>880142</project_id><text_data>CATHY MICHELBRINK - RESIDENTIAL BATH EXHAUST FAN2005 CHERRY ST - ABERDEEN WA   98520CLIENT #1913JOB #1976294</text_data><comment_date>2019-05-02T00:00:00</comment_date></row><row _id="row-6i58-5pub-d72n" _uuid="00000000-0000-0000-325C-43284E97E4E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6i58-5pub-d72n"><intent_id>811973</intent_id><project_id>811628</project_id><text_data>Ricky Howard is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing a new ductless heat pump, two new bathroom fans, new kitchen fan and new CO detector. This job meets the residential job requirements.</text_data><comment_date>2017-01-19T00:00:00</comment_date></row><row _id="row-r6v8-pa7i~ebxt" _uuid="00000000-0000-0000-934C-99A637348653" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r6v8-pa7i~ebxt"><intent_id>1057676</intent_id><project_id>918828</project_id><text_data>President *- 1Vice President* - 1Scientist I - VI* - 1Engineer I - VI* - 1Planner I - V* - 1GIS Analyst I - IV* - 1CAD Technician I - IV* - 1Landscape Architect I - III* - 1CAD / GIS I - IV* - 1Accounting Staff*  - 1Senior Administrative Staff* - 1*Services performed by Herrera Environmental Consultants Inc are not subject to Prevailing Wages</text_data><comment_date>2020-05-13T00:00:00</comment_date></row><row _id="row-efea~xi43_ecfs" _uuid="00000000-0000-0000-E487-1546695B5D44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efea~xi43_ecfs"><intent_id>959668</intent_id><project_id>872924</project_id><text_data>(1002431)Replaced 1 CF Ballast and Lamp</text_data><comment_date>2019-02-11T00:00:00</comment_date></row><row _id="row-cfna.62ti~hexq" _uuid="00000000-0000-0000-F6AA-E9BCB77DE20B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cfna.62ti~hexq"><intent_id>926241</intent_id><project_id>858945</project_id><text_data>Contractor Registration change effective 1/1/2018.  6/1/17-12/31/17 filed under Argus Janitorial UBI 602704033.</text_data><comment_date>2018-08-16T00:00:00</comment_date></row><row _id="row-g8fj-giyt.xyde" _uuid="00000000-0000-0000-5C25-E06518171F1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8fj-giyt.xyde"><intent_id>1183579</intent_id><project_id>982551</project_id><text_data>Truck Driver rate is paid to employees driving company issued trucks to transport materials/supplies pertaining to the job site.</text_data><comment_date>2021-10-06T00:00:00</comment_date></row><row _id="row-ebme~2vm2-jz37" _uuid="00000000-0000-0000-DFED-3C6767E7B54C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebme~2vm2-jz37"><intent_id>597329</intent_id><project_id>717369</project_id><text_data>The beautification of areas adjacent to roadway and bridge through the installation of trees &amp; shrubs, compost &amp; bark mulch.  Equip: Backhoe 75hp &amp; under, Hydroseeder, &amp; hand tools.Other Trucks: Chevy Tiltmaster rear dual axle use to haul materials &amp; equipment to site.</text_data><comment_date>2013-10-02T00:00:00</comment_date></row><row _id="row-6ads_2pfy.fstu" _uuid="00000000-0000-0000-94EC-B3CEF167CE9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ads_2pfy.fstu"><intent_id>468427</intent_id><project_id>648013</project_id><text_data>I made a mistake.  We will only have an owner working, but no employee's.</text_data><comment_date>2011-08-11T00:00:00</comment_date></row><row _id="row-diba.34ds_yaau" _uuid="00000000-0000-0000-A4C5-24BBD0ABAA80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-diba.34ds_yaau"><intent_id>1128876</intent_id><project_id>954336</project_id><comment_date>2021-03-15T00:00:00</comment_date></row><row _id="row-4bxu~ckpf~gja6" _uuid="00000000-0000-0000-B72B-3A1FF386D2AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4bxu~ckpf~gja6"><intent_id>900400</intent_id><project_id>849087</project_id><text_data>&amp; inv 6000303041</text_data><comment_date>2018-04-24T00:00:00</comment_date></row><row _id="row-tj4f.8sxb_3rvx" _uuid="00000000-0000-0000-2511-828643751DC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tj4f.8sxb_3rvx"><intent_id>645139</intent_id><project_id>740797</project_id><text_data>Service Call 140424-0026</text_data><comment_date>2014-08-01T00:00:00</comment_date></row><row _id="row-ycst~9f2i-26v4" _uuid="00000000-0000-0000-4590-2C152E387AD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ycst~9f2i-26v4"><intent_id>638103</intent_id><project_id>738244</project_id><text_data>Cleaning a brick building removing select areas of mortar and replacing with new application of w water repelant and repair of cualk joints</text_data><comment_date>2014-06-30T00:00:00</comment_date></row><row _id="row-awun~ccse-97f9" _uuid="00000000-0000-0000-BE4C-A848CB412F00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-awun~ccse-97f9"><intent_id>907099</intent_id><project_id>851758</project_id><text_data>Install network cabling and intercom system cabling for portable.</text_data><comment_date>2018-05-25T00:00:00</comment_date></row><row _id="row-9qh8-ztqv_cz69" _uuid="00000000-0000-0000-F08A-611BC2B6B711" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9qh8-ztqv_cz69"><intent_id>1258793</intent_id><project_id>1026910</project_id><text_data>General Laborer consists of hand work only. No power tools or equipment $35.23 base + $8.81 pensionCrane Oiler/Driver is being used for an Oil Distributor. Wage band approach is being utilized per Harvey Means. $39.97 base + $9.99 pensionOther trucks consists of a 0 to 8000 gallon water truck used to help with compaction and dust control $41.70 base + $10.43 pension</text_data><comment_date>2022-08-17T00:00:00</comment_date></row><row _id="row-7bqz.g9a4~ms85" _uuid="00000000-0000-0000-A312-AEE9F28123D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7bqz.g9a4~ms85"><intent_id>1074401</intent_id><project_id>920534</project_id><text_data>Marshbank job# 20115TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2020-07-22T00:00:00</comment_date></row><row _id="row-85y6.rre5-4eqc" _uuid="00000000-0000-0000-4D47-AED981DDB0B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-85y6.rre5-4eqc"><intent_id>468643</intent_id><project_id>660706</project_id><text_data>Chuckanut park &amp; ride, Burlington WA</text_data><comment_date>2011-07-27T00:00:00</comment_date></row><row _id="row-rvef-s83d~5njv" _uuid="00000000-0000-0000-7900-F9C99DA8F261" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rvef-s83d~5njv"><intent_id>983704</intent_id><project_id>883812</project_id><text_data>#20510, Lash, Dena, 512 E Glass, Spokane</text_data><comment_date>2019-06-25T00:00:00</comment_date></row><row _id="row-xev3-tren~xnyt" _uuid="00000000-0000-0000-58C9-FD69EAAA0BA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xev3-tren~xnyt"><intent_id>1068003</intent_id><project_id>923566</project_id><text_data>9849608</text_data><comment_date>2020-06-25T00:00:00</comment_date></row><row _id="row-m3mz~ezfn.xrqj" _uuid="00000000-0000-0000-50A9-F078FBC0FB35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m3mz~ezfn.xrqj"><intent_id>556561</intent_id><project_id>705076</project_id><text_data>Laborer to clean parking lot with electric broom and blowers and help with clean up of stencils and paint.  Owner will be striping the parking lot with Graco Striper</text_data><comment_date>2013-02-22T00:00:00</comment_date></row><row _id="row-sq33-e3fr.rmhg" _uuid="00000000-0000-0000-9EDA-042E5FB4BA95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sq33-e3fr.rmhg"><intent_id>630596</intent_id><project_id>735339</project_id><text_data>Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor).  For this Intent filing firms are to enter �Time and Materials� for  the dollar amount of the contract as an exact dollar amount cannot be identified at the time of filing. To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  When filing these forms, the dollar amount of the contract (which is the total amount that will be invoiced), including tax, will be entered on the form along with a short explanation in the notes section about the nature of the work so that the project can be tracked by the awarding agency and L&amp;I. In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures.  Please note that an on-call/blanket/annual contract may not be utilized for construction projects or for warranty work as these require their own set of Intent and Affidavit forms with the appropriate bid and award dates associated with those specific contracts.  The use of on-call/blanket/annual contracts is limited to minor maintenance and repair work.  If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out.  This form filing requirement also applies to owner/operators.  Please follow this filing method on any future contracts covered under this policy.  (RCW 39.12.040) We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.  A link is provided below. http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp If you have any questions, please contact me.The answers provided are based upon the specific information provided.  References to the Revised Code of Washington (RCW) and Washington Administrative Code (WAC) are included.  If the facts differ from those provided, the answers may be different.Ramona Christensen-RussellIndustrial Relations SpecialistDepartment of Labor &amp; IndustriesPrevailing Wage ProgramP. O. Box 44540Olympia, WA  98504-4540Telephone:  (360) 902-5056Facsimile:   (360) 902-5300</text_data><comment_date>2014-05-20T00:00:00</comment_date></row><row _id="row-dxeb-xs4q-23ep" _uuid="00000000-0000-0000-5531-BF0000B5D6A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dxeb-xs4q-23ep"><intent_id>967936</intent_id><project_id>872671</project_id><text_data>The project consists of adding sidewalk, curb and storm water system. Our portion will be installing topsoil, not to exceed 6 inches in depth by an owner/operator using a conveyor truck. We will also be installing plants using shovels, rakes and hand tools. We will not be installing any subsurface water collection systems.</text_data><comment_date>2019-03-27T00:00:00</comment_date></row><row _id="row-4jmk-2exa.8eq2" _uuid="00000000-0000-0000-2F94-49D6DAF68028" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4jmk-2exa.8eq2"><intent_id>726921</intent_id><project_id>774829</project_id><text_data>Job # 8006750</text_data><comment_date>2015-10-16T00:00:00</comment_date></row><row _id="row-86y3-yzjk-yy85" _uuid="00000000-0000-0000-63E8-34EDAD8BEDB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-86y3-yzjk-yy85"><intent_id>531572</intent_id><project_id>690362</project_id><text_data>Beautification of area adjacent to high school through the installation of grass.  Equip: Hydroseeder, hand tools.</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-yz6b~46wv~uagy" _uuid="00000000-0000-0000-FF0D-E068C8A9ABA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yz6b~46wv~uagy"><intent_id>615482</intent_id><project_id>717717</project_id><text_data>Filed By: Carla StoneProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2014-02-07T00:00:00</comment_date></row><row _id="row-rmqp.wpfg_asvw" _uuid="00000000-0000-0000-B0AE-14C15DAD24BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rmqp.wpfg_asvw"><intent_id>545288</intent_id><project_id>692735</project_id><text_data>General Laborer - Sweep and/or shovel gravel from edge of roadway.</text_data><comment_date>2012-11-20T00:00:00</comment_date></row><row _id="row-fqia.w2n8.ckjm" _uuid="00000000-0000-0000-F132-60B0C1F58B67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fqia.w2n8.ckjm"><intent_id>578619</intent_id><project_id>712854</project_id><text_data>013048</text_data><comment_date>2013-07-01T00:00:00</comment_date></row><row _id="row-3pe7~jque-tbmw" _uuid="00000000-0000-0000-6562-8F78FB9BDF83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3pe7~jque-tbmw"><intent_id>681556</intent_id><project_id>747929</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2015-03-05T00:00:00</comment_date></row><row _id="row-5bty_jqxk_h5fy" _uuid="00000000-0000-0000-0968-F4DB2A9364D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bty_jqxk_h5fy"><intent_id>511392</intent_id><project_id>687462</project_id><text_data>Our contract #30654</text_data><comment_date>2012-05-10T00:00:00</comment_date></row><row _id="row-3zx7_4wcx~mmn3" _uuid="00000000-0000-0000-1441-AF87D0039536" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3zx7_4wcx~mmn3"><intent_id>566578</intent_id><project_id>688061</project_id><text_data>Hydroseed water runoff swail</text_data><comment_date>2013-04-25T00:00:00</comment_date></row><row _id="row-2h2j.zrmj~88qb" _uuid="00000000-0000-0000-2339-CBB793732D92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2h2j.zrmj~88qb"><intent_id>908698</intent_id><project_id>852395</project_id><text_data>Preformed load bank, a resistive test for 2 hours progressing to 80% of generator capacity, on Generators 1-4. Employees drive either a 2500 or a 3500 Chevy Silverado to and from the job site.</text_data><comment_date>2018-06-04T00:00:00</comment_date></row><row _id="row-px6n~ydgc.jetc" _uuid="00000000-0000-0000-4FCC-B0A1D7391BCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-px6n~ydgc.jetc"><intent_id>1042933</intent_id><project_id>911064</project_id><text_data>Pulled roots out.  Camera line.  Pipe os off set.  Try to jet line to many turns.</text_data><comment_date>2020-03-04T00:00:00</comment_date></row><row _id="row-b7sr-rvkd_chhy" _uuid="00000000-0000-0000-E4ED-E71EB511E9A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b7sr-rvkd_chhy"><intent_id>1270981</intent_id><project_id>1033389</project_id><text_data>1 INSULATION, WINDOWS, MECHANICAL VENTILATION, DUCT SEALING, CO &amp; SMOKE DETECTORS, ENERGY SAVING DEVICES2 YES3 ONE4 A NO B NO C YES D NO E NO F NO G NO H NO I NO J NO K NO L N/A5 YES6 YES7 NO8 NO</text_data><comment_date>2022-09-30T00:00:00</comment_date></row><row _id="row-6crh_4sa5.5h63" _uuid="00000000-0000-0000-D260-9F2FF9B45CA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6crh_4sa5.5h63"><intent_id>1200250</intent_id><project_id>992369</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. BCI Project No. PE2011</text_data><comment_date>2021-12-17T00:00:00</comment_date></row><row _id="row-zxua.cyhp-6qdg" _uuid="00000000-0000-0000-1B6E-2DC4CCBB3F6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxua.cyhp-6qdg"><intent_id>1236599</intent_id><project_id>998004</project_id><text_data>#1 - Exterior Painting, #2 - Apartment, #3 - 3, #4 - Living, (A) No, (B) No, (C) No, (D) No, (E) No, (F) No, (G)No,(H) No,(I)No, (j) No,(K) No, (I) No, #5 Yes, #6 Yes, #8, Yes #9 No.</text_data><comment_date>2022-05-25T00:00:00</comment_date></row><row _id="row-jhd9-kbps.yiu2" _uuid="00000000-0000-0000-5041-6F8D23347D5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jhd9-kbps.yiu2"><intent_id>618778</intent_id><project_id>730270</project_id><text_data>1. Insulation2. Apartment3. 24. SF Dwelling A. No B. No C. Yes D. No E. No F. No G. No H. No I. No J. No K. No 5. Yes 6. Yes7. Yes8. No</text_data><comment_date>2014-03-05T00:00:00</comment_date></row><row _id="row-c7nz.g6a8-y367" _uuid="00000000-0000-0000-EA3D-D608ACD8493F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c7nz.g6a8-y367"><intent_id>1066544</intent_id><project_id>922924</project_id><text_data>Motor Patrol Graders (will be used for out Hydro Vac Truck 7400) this is used for hydro excavating</text_data><comment_date>2020-06-29T00:00:00</comment_date></row><row _id="row-pyr6-wskt.r4zt" _uuid="00000000-0000-0000-E6EF-88150F285A89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pyr6-wskt.r4zt"><intent_id>598482</intent_id><project_id>721669</project_id><text_data>Elect Tech (06) - Install 8 locations - Cat5e wiring for wireless.  Work to be performed indoors.</text_data><comment_date>2013-10-09T00:00:00</comment_date></row><row _id="row-8izm-ggxx~hnuq" _uuid="00000000-0000-0000-3CF5-D868CE427105" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8izm-ggxx~hnuq"><intent_id>465508</intent_id><project_id>669942</project_id><text_data>Install Grizzly Conveyor belt on site</text_data><comment_date>2019-06-21T00:00:00</comment_date></row><row _id="row-cn26.4bh8~zc7x" _uuid="00000000-0000-0000-0F8E-A4B74848D2BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cn26.4bh8~zc7x"><intent_id>614806</intent_id><project_id>728516</project_id><text_data>Job #2796 - Ann Davis  15459 Bonney Lane - Mount Vernon,  WA  98273Job #2808 - Carol Dufur 3267 Butler Creek Road - Sedro Woolley,  WA  98284</text_data><comment_date>2014-02-03T00:00:00</comment_date></row><row _id="row-uyaq.nb32-ia3d" _uuid="00000000-0000-0000-3D23-4633F29A13C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uyaq.nb32-ia3d"><intent_id>820944</intent_id><project_id>808749</project_id><text_data>Tunstall, Job#501881, PO#44919</text_data><comment_date>2017-03-15T00:00:00</comment_date></row><row _id="row-y8pg-48ui~9cyt" _uuid="00000000-0000-0000-3E7A-2B7653AC9FE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8pg-48ui~9cyt"><intent_id>532449</intent_id><project_id>695241</project_id><text_data>Job #3212 Moran Prairie Library</text_data><comment_date>2012-09-04T00:00:00</comment_date></row><row _id="row-wbus-qgm5~cwfx" _uuid="00000000-0000-0000-E6E9-DEFC1A52D8C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wbus-qgm5~cwfx"><intent_id>694911</intent_id><project_id>762415</project_id><text_data>Cut tiles with wet saw, mix then set with electric mixer.  Carlos M. Hale- Owner/Operator</text_data><comment_date>2015-05-15T00:00:00</comment_date></row><row _id="row-mses.biti-8znu" _uuid="00000000-0000-0000-ABD6-A4C812034A73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mses.biti-8znu"><intent_id>927364</intent_id><project_id>853444</project_id><text_data>Russell Landscaping is responsible for installing approximately 2,00 square feet of sod using wheelbarrows and manual labor.</text_data><comment_date>2018-08-21T00:00:00</comment_date></row><row _id="row-m2u7.qdpf-vydv" _uuid="00000000-0000-0000-FCAB-AA3ADD50128B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2u7.qdpf-vydv"><intent_id>1026030</intent_id><project_id>901590</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2019-12-10T00:00:00</comment_date></row><row _id="row-272v.zm9j~dwr7" _uuid="00000000-0000-0000-1930-44960525DA25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-272v.zm9j~dwr7"><intent_id>517096</intent_id><project_id>689410</project_id><text_data>Installing PVC irrigation pipe for underground lawn sprinkler system to a maximum depth of 18 inches. Equipment and tools include: walk behind trencher, skidsteer, and applicable hand tools.</text_data><comment_date>2012-06-18T00:00:00</comment_date></row><row _id="row-ztg6~g5it-is56" _uuid="00000000-0000-0000-085E-3038A615CEF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ztg6~g5it-is56"><intent_id>669410</intent_id><project_id>750572</project_id><text_data>Form filed by: Paul Minkler</text_data><comment_date>2014-12-11T00:00:00</comment_date></row><row _id="row-gt54.bp29.y5ni" _uuid="00000000-0000-0000-BA59-E7CAFE0F50E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gt54.bp29.y5ni"><intent_id>758427</intent_id><project_id>790361</project_id><text_data>This was a flagpole replacement project, where someone had damaged the previous pole.  Two employees drove to the jobsite in a company truck, cleaned up the pre-existing mounting bolts, then removed the flagpole from the truck and walked it into position, plumbed it up with a 24&amp;quot; level, locked it down with a wrench, and left.</text_data><comment_date>2016-04-27T00:00:00</comment_date></row><row _id="row-wr3v-w83q.geut" _uuid="00000000-0000-0000-FFDD-72815CBF5FA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wr3v-w83q.geut"><intent_id>813477</intent_id><project_id>812327</project_id><text_data>Joyce Schilt is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The work to be performed is installing 2 new bathroom fans, new CO detector, an electrical safety inspection, and installing a new ductless heat pump. This job meets the residential job requirements.</text_data><comment_date>2017-01-30T00:00:00</comment_date></row><row _id="row-dpv8.djh9_4btp" _uuid="00000000-0000-0000-B3F6-64D35F532B6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpv8.djh9_4btp"><intent_id>1065544</intent_id><project_id>922472</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install distribution cable for voice / data communications. Install copper cables for communications backbone between equipment rooms. Terminate cables in the equipment room and terminate the cables routed between Comm. equipment rooms.</text_data><comment_date>2020-06-16T00:00:00</comment_date></row><row _id="row-xuin_rqpj~4d6u" _uuid="00000000-0000-0000-2A37-B7445CA8E96D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xuin_rqpj~4d6u"><intent_id>1050158</intent_id><project_id>915027</project_id><text_data>Blythe work order 92347^</text_data><comment_date>2020-04-08T00:00:00</comment_date></row><row _id="row-q7pd.8ui9~vdse" _uuid="00000000-0000-0000-F255-66BF2BE65E1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q7pd.8ui9~vdse"><intent_id>545279</intent_id><project_id>661000</project_id><text_data>Truck Driver 3 and 4 axle semi tractorsPaid time offVacation 120 hoursHoliday 72 HoursFringe BenefitsPd Time Off $2.49, $2.59 &amp; $2.79Health &amp; Welfare $7.09Pension $5.75</text_data><comment_date>2012-11-20T00:00:00</comment_date></row><row _id="row-6xeb_8ngx-3t74" _uuid="00000000-0000-0000-2C38-77BE68B244BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xeb_8ngx-3t74"><intent_id>617174</intent_id><project_id>723844</project_id><text_data>PLEASE REF POWERCOM JOB #922132.PROVIDE AND INSTALL CAT6 CABLES, TEST, LABEL ALL NEW CABLESIN C30 ENGINEERING LAB AT WALLA WALLA, WASHINGTON.</text_data><comment_date>2014-02-20T00:00:00</comment_date></row><row _id="row-zjnn~ydqm~7jck" _uuid="00000000-0000-0000-37DB-0994FC95B0A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zjnn~ydqm~7jck"><intent_id>581460</intent_id><project_id>713042</project_id><text_data>Surface and striping of running track.</text_data><comment_date>2013-07-16T00:00:00</comment_date></row><row _id="row-mdti_zmr8_54dt" _uuid="00000000-0000-0000-76DB-36607C866E93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mdti_zmr8_54dt"><intent_id>921555</intent_id><project_id>848375</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2018-07-27T00:00:00</comment_date></row><row _id="row-3xan-t89k_v35x" _uuid="00000000-0000-0000-E535-BA9CA80ADB35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3xan-t89k_v35x"><intent_id>952809</intent_id><project_id>869652</project_id><text_data>NWAP Invoice 3956</text_data><comment_date>2018-12-31T00:00:00</comment_date></row><row _id="row-yxr9~ngyd-ycch" _uuid="00000000-0000-0000-7BD8-081EAEF69BF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yxr9~ngyd-ycch"><intent_id>1171113</intent_id><project_id>958573</project_id><text_data>Prevailing wage training has been completed</text_data><comment_date>2021-08-27T00:00:00</comment_date></row><row _id="row-jy6j-vm75~gt8d" _uuid="00000000-0000-0000-40CB-B5DF098C0C3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jy6j-vm75~gt8d"><intent_id>726536</intent_id><project_id>774693</project_id><text_data>Saybr Contractors Inc. is the prime contractor.  This is a Job Order Contract for Washington State Department of Enterprise.Contract # 2014-034G Work Order #92Project # 2015-623Contract # C16-045</text_data><comment_date>2015-10-15T00:00:00</comment_date></row><row _id="row-hvny.md2i.pgp9" _uuid="00000000-0000-0000-F4F5-D78147575295" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hvny.md2i.pgp9"><intent_id>705876</intent_id><project_id>762999</project_id><text_data>Work description: Install new chillier and associated HVAC piping in existing facility. Laborer:clean-up with broom and shop vacuumpick up, stock and organize raw materialsclean installed parts and pieces Tools used by laborer: Broom, vacuum, dustpan, garbage can</text_data><comment_date>2015-07-21T00:00:00</comment_date></row><row _id="row-hjy7~unay-3e72" _uuid="00000000-0000-0000-4975-C39E48C17801" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjy7~unay-3e72"><intent_id>1245369</intent_id><project_id>1019950</project_id><text_data>Federal vs. state wages. State was higher except carpenter. Federal carpenter had a zone pay that made the wage higher. Dump Truck is 10 Cubic Yard End Dump</text_data><comment_date>2022-06-29T00:00:00</comment_date></row><row _id="row-8pja~vadr.4zft" _uuid="00000000-0000-0000-A662-1D01B9253877" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8pja~vadr.4zft"><intent_id>688351</intent_id><project_id>759656</project_id><text_data>Form filed by:  Chris Granstrom</text_data><comment_date>2015-04-09T00:00:00</comment_date></row><row _id="row-atev.eh5t.f62y" _uuid="00000000-0000-0000-81AD-C67C038B77B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-atev.eh5t.f62y"><intent_id>666461</intent_id><project_id>735578</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-11-20T00:00:00</comment_date></row><row _id="row-y9iq~cn6v-49sk" _uuid="00000000-0000-0000-39D9-2F8D43839938" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y9iq~cn6v-49sk"><intent_id>681985</intent_id><project_id>756879</project_id><text_data>Job # 9023266</text_data><comment_date>2015-03-04T00:00:00</comment_date></row><row _id="row-xwnm-47ty_sz3j" _uuid="00000000-0000-0000-8EB4-F01F55FE04C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xwnm-47ty_sz3j"><intent_id>627504</intent_id><project_id>734076</project_id><text_data>Scope of work to include: installation of medium bark mulch and 5/8&amp;quot; minus gravel using shovels, rakes,buckets, wheelbarrows,and Ford F550 truck.</text_data><comment_date>2014-05-01T00:00:00</comment_date></row><row _id="row-tx4q_we7w.zkkx" _uuid="00000000-0000-0000-312E-BC2EC8253B1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tx4q_we7w.zkkx"><intent_id>802004</intent_id><project_id>802949</project_id><text_data>Project is Stormwater improvements at the park.  Our scope of work is to hydroseed grass areas with a 75 hp Bowie Hydroseeder</text_data><comment_date>2016-11-17T00:00:00</comment_date></row><row _id="row-m2yh~x6bp.qfym" _uuid="00000000-0000-0000-7A7E-9D5A48E37C1D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2yh~x6bp.qfym"><intent_id>869001</intent_id><project_id>835087</project_id><text_data>WO# 3898</text_data><comment_date>2017-10-13T00:00:00</comment_date></row><row _id="row-hs25-3awx.qdv3" _uuid="00000000-0000-0000-5B8D-3F0B272F5302" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hs25-3awx.qdv3"><intent_id>1094580</intent_id><project_id>935651</project_id><text_data>Install synthetic turf to the lower event lawn - installation to include gravel base, border, turf and top dress sand.</text_data><comment_date>2020-10-08T00:00:00</comment_date></row><row _id="row-i7u6.uxx9-cehy" _uuid="00000000-0000-0000-11A9-4EF039AA7A08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7u6.uxx9-cehy"><intent_id>700191</intent_id><project_id>764650</project_id><text_data>Job # 8002788</text_data><comment_date>2015-06-11T00:00:00</comment_date></row><row _id="row-em8j.tn3x-23d7" _uuid="00000000-0000-0000-5441-D564BA66A89B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-em8j.tn3x-23d7"><intent_id>1129281</intent_id><project_id>954549</project_id><text_data>MMFS 73212036</text_data><comment_date>2021-03-17T00:00:00</comment_date></row><row _id="row-6sc6_ddgm.kka7" _uuid="00000000-0000-0000-BF2F-FD541833F39D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6sc6_ddgm.kka7"><intent_id>1267737</intent_id><project_id>1031655</project_id><text_data>Single Family IntentIn order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2- Single Family3-1-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- nok- no5- Yes6- no7- no8- no</text_data><comment_date>2022-09-19T00:00:00</comment_date></row><row _id="row-hcen-yvja~qbni" _uuid="00000000-0000-0000-3DD8-3B8B8AC7F224" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hcen-yvja~qbni"><intent_id>1161597</intent_id><project_id>971309</project_id><text_data>01-AB02-MJ</text_data><comment_date>2021-07-20T00:00:00</comment_date></row><row _id="row-yphg~3eqj-y2uy" _uuid="00000000-0000-0000-8B55-D8050D0AD58E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yphg~3eqj-y2uy"><intent_id>1227994</intent_id><project_id>1009926</project_id><text_data>9886863</text_data><comment_date>2022-04-25T00:00:00</comment_date></row><row _id="row-jgtt.32pb.xcah" _uuid="00000000-0000-0000-473E-2F24A42E4195" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgtt.32pb.xcah"><intent_id>1242116</intent_id><project_id>1018107</project_id><text_data>Tools used to install the basketball court are: Levels, wrenches, ladders, generator, mallet, hammer, shovels, wheelbarrowExcavate for concrete footing, mix bagged concrete, set anchor bolts in concrete and let set for three days, Put together basketball hoop and set on anchor bolts, plumb posts and tighten nuts.</text_data><comment_date>2022-07-07T00:00:00</comment_date></row><row _id="row-u8fx~mayh_mr4b" _uuid="00000000-0000-0000-0FB5-AA8C73CE299C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u8fx~mayh_mr4b"><intent_id>984157</intent_id><project_id>879072</project_id><text_data>FILED BY LARRY JULIEN</text_data><comment_date>2019-06-12T00:00:00</comment_date></row><row _id="row-uvir-y847~mdhh" _uuid="00000000-0000-0000-90EE-174B1964FA21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uvir-y847~mdhh"><intent_id>631584</intent_id><project_id>735745</project_id><text_data>Form filed by: Glen Brooks</text_data><comment_date>2014-05-27T00:00:00</comment_date></row><row _id="row-23iv~u56m~k6p4" _uuid="00000000-0000-0000-28D6-18F72382E00D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-23iv~u56m~k6p4"><intent_id>994433</intent_id><project_id>888217</project_id><text_data>SR# 43056732</text_data><comment_date>2019-07-24T00:00:00</comment_date></row><row _id="row-hec6_ss6m~yctu" _uuid="00000000-0000-0000-3F32-8B328DE74DA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hec6_ss6m~yctu"><intent_id>522065</intent_id><project_id>685370</project_id><text_data>It appears your company may not be properly calculating worker fringe benefits. By separate email we are sending you a document that explains the benefits calculation process acceptable to the department. Please review that document and adjust your procedures as necessary. Approval of this form does not constitute approval of the methodology your company is using in determining the amount of such contributions. We reserve the right to investigate further the issue on this and future forms that your company submits on which the benefits calculation appears erroneous. If you have questions, please contact Marcus Ehrlander at (360) 902-5334 or marcus.ehrlander@Lni.wa.gov.</text_data><comment_date>2012-10-08T00:00:00</comment_date></row><row _id="row-ds2r_3kya.dn4z" _uuid="00000000-0000-0000-FB31-3947E936F820" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ds2r_3kya.dn4z"><intent_id>992166</intent_id><project_id>887337</project_id><text_data>I corrected my Articulated Dump Truck to Elevating Grader-type Loader per an email from Aaron Nelson-Industrial Relations Specialist for L&amp;I.</text_data><comment_date>2019-07-26T00:00:00</comment_date></row><row _id="row-7877~zk2d-qaut" _uuid="00000000-0000-0000-3050-64B732936B14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7877~zk2d-qaut"><intent_id>1084395</intent_id><project_id>930943</project_id><text_data>We are installing bark into landscape beds. The owner will be performing the installation, while laborers perform cleanup with a leaf blower which falls under the landscape beautification classification. The laborers will be paid the published rate for Groundskeeper under Landscape Maintenance.</text_data><comment_date>2020-08-29T00:00:00</comment_date></row><row _id="row-9sr3-dwne~2h5c" _uuid="00000000-0000-0000-38C2-D362BA42B577" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9sr3-dwne~2h5c"><intent_id>1065578</intent_id><project_id>907342</project_id><text_data>Fringe BreakdownHealth $8.54Pension $11Apprenticeship $.72IMPACT $.27PTO $2.30</text_data><comment_date>2020-06-16T00:00:00</comment_date></row><row _id="row-vdjc_u8bx~26qh" _uuid="00000000-0000-0000-80CF-01F5DF8EE19C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vdjc_u8bx~26qh"><intent_id>1147818</intent_id><project_id>964021</project_id><text_data>Project# 03192, Lykins, Frances, 208 S Neyland Ave, Lot 49, Liberty Lake, WA 99019</text_data><comment_date>2021-06-22T00:00:00</comment_date></row><row _id="row-nugf~j7ds_9gf4" _uuid="00000000-0000-0000-2E31-0CBA52483506" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nugf~j7ds_9gf4"><intent_id>566452</intent_id><project_id>709682</project_id><text_data>B</text_data><comment_date>2013-04-25T00:00:00</comment_date></row><row _id="row-h4nf~3t5i_2bww" _uuid="00000000-0000-0000-7487-83805D67B17A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h4nf~3t5i_2bww"><intent_id>582187</intent_id><project_id>710561</project_id><text_data>SCOPE OF WORK CORRECTION: Use tractor and box scraper to grade 5/8&amp;quot; gravel physical training trail. Use 3500 Chevy with dump bed to unload 5/8&amp;quot; gravel and to apply new 2&amp;quot; layer 5/8&amp;quot; gravel. Use tractor and box scraper to level gravel. Use drum compacter to compact trail. Please disregard the previous scope of work.</text_data><comment_date>2013-08-19T00:00:00</comment_date></row><row _id="row-6zy6-eu2d~diyt" _uuid="00000000-0000-0000-0D89-9739532B60D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6zy6-eu2d~diyt"><intent_id>1038996</intent_id><project_id>908756</project_id><text_data>1.  Toilet &amp; shower repair, repair plumbing leaks2. Single Family 3. 14. a- no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no k. no5. yes6. yes7. no8. no</text_data><comment_date>2020-02-17T00:00:00</comment_date></row><row _id="row-4ecb-x5mt-xwpm" _uuid="00000000-0000-0000-69C3-039BB8BA6495" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ecb-x5mt-xwpm"><intent_id>813033</intent_id><project_id>812112</project_id><text_data>1. Electric Furnace Repair2. Single Family Dwelling3. 14. a,b  NO4. c  YES4. d,e,f,g,h,i,j,k  NO5. YES6. YES7. NO8. NO</text_data><comment_date>2017-01-26T00:00:00</comment_date></row><row _id="row-j6hk-ayqa~f6id" _uuid="00000000-0000-0000-CC94-23F4C90E4FB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j6hk-ayqa~f6id"><intent_id>702031</intent_id><project_id>764306</project_id><text_data>We will be cleaning up the interior of houses that were occupied by illegal squatters prior to demolition. (garbage, needles and other items that need to be removed prior to demolition)</text_data><comment_date>2015-06-19T00:00:00</comment_date></row><row _id="row-sr9r_6ved_ithm" _uuid="00000000-0000-0000-5D60-5AFA03BE6884" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sr9r_6ved_ithm"><intent_id>658192</intent_id><project_id>731616</project_id><text_data>We are working as a subcontractor to a landscape company on this landscaping project. We will be installing compost or bark mulch as a topdressing to finish off the landscaped beds and our work falls under the landscape beautification category. Our laborers are responsible for backpack blower cleanup and will be paid according to the rates published for landscaping and planting laborer. The operator of the blower truck will be paid according to the oil distribution / mulch distribution power equipment operator category. Please approve this intent as filed. Thank you for your assistance.</text_data><comment_date>2014-10-02T00:00:00</comment_date></row><row _id="row-qe5n_6z2b.ae4d" _uuid="00000000-0000-0000-6975-01646D5C447C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qe5n_6z2b.ae4d"><intent_id>1018655</intent_id><project_id>898200</project_id><text_data>#20550, Stephens, Johnathon, 1627 E Buckeye, Spokane</text_data><comment_date>2019-11-15T00:00:00</comment_date></row><row _id="row-kdzc-85ui_as4a" _uuid="00000000-0000-0000-2589-3C5A02B23464" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kdzc-85ui_as4a"><intent_id>1035586</intent_id><project_id>905432</project_id><text_data>Oldcastle infrastructure believes that the work and hours described in this intent to pay prevailing wage and/or affidavit of wages paid is not subject to payment of prevailing wage.  Oldcastle precast's filing of an intent to pay prevailing wage and/or affidavit of wages paid may not be construed in any manner whatsoever as an acknowledgement or agreement that hte work and hours described therein are subject to payment of prevailing wage.</text_data><comment_date>2020-02-03T00:00:00</comment_date></row><row _id="row-zew7~g26v~945s" _uuid="00000000-0000-0000-9827-437C9B38A885" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zew7~g26v~945s"><intent_id>714256</intent_id><project_id>763870</project_id><text_data>Type of System worked on: Internet Wireless Access Points</text_data><comment_date>2015-08-26T00:00:00</comment_date></row><row _id="row-ynum_nab3~cq7e" _uuid="00000000-0000-0000-0EAF-8A12D20388B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ynum_nab3~cq7e"><intent_id>1245794</intent_id><project_id>1020183</project_id><text_data>Tribal owned, we have our own Insurance Covered</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-zi4y~5viu_94yp" _uuid="00000000-0000-0000-4AF1-06331477EF9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zi4y~5viu_94yp"><intent_id>1119847</intent_id><project_id>942781</project_id><text_data>reroof</text_data><comment_date>2021-02-03T00:00:00</comment_date></row><row _id="row-gin8_b827-ju62" _uuid="00000000-0000-0000-447F-313AEC906A9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gin8_b827-ju62"><intent_id>727665</intent_id><project_id>775138</project_id><text_data>mow lawn, garden beds, irrigaiton</text_data><comment_date>2015-10-21T00:00:00</comment_date></row><row _id="row-74it.49k4_sj2p" _uuid="00000000-0000-0000-9EF2-ABA99B4619FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74it.49k4_sj2p"><intent_id>1366339</intent_id><project_id>1088747</project_id><text_data>9926154</text_data><comment_date>2023-09-23T00:00:00</comment_date></row><row _id="row-ytra~jfkb_ed8h" _uuid="00000000-0000-0000-BA70-E796EA463181" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ytra~jfkb_ed8h"><intent_id>741151</intent_id><project_id>782467</project_id><text_data>compressor walkthrough</text_data><comment_date>2016-01-12T00:00:00</comment_date></row><row _id="row-f9sj_tx2w.8syb" _uuid="00000000-0000-0000-C22A-745A54D9969F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f9sj_tx2w.8syb"><intent_id>584362</intent_id><project_id>710785</project_id><text_data>PENHALL # 221094OTHER TRUCK IS WATER PUMP TRUCK 10000 GAL.</text_data><comment_date>2013-07-30T00:00:00</comment_date></row><row _id="row-eews~htx3-6w2j" _uuid="00000000-0000-0000-AAB3-E399D5583E5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eews~htx3-6w2j"><intent_id>486996</intent_id><project_id>658952</project_id><text_data>Cort Trucking is a sole-proprietorship and operates as an owner-operator with no employees.</text_data><comment_date>2011-11-01T00:00:00</comment_date></row><row _id="row-74f7.66uc~s543" _uuid="00000000-0000-0000-5BA6-D65AB5A8DF0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74f7.66uc~s543"><intent_id>904730</intent_id><project_id>850780</project_id><text_data>Install 89 lf perm fence and repair 10&amp;#39; of fence.  Install a gate.</text_data><comment_date>2018-05-15T00:00:00</comment_date></row><row _id="row-yrpr-4zpz.ad88" _uuid="00000000-0000-0000-F770-0A5248530F44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yrpr-4zpz.ad88"><intent_id>1166884</intent_id><project_id>973980</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2021-08-06T00:00:00</comment_date></row><row _id="row-scw5-g7z8.hgm4" _uuid="00000000-0000-0000-3EC5-28F05F378CB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-scw5-g7z8.hgm4"><intent_id>638406</intent_id><project_id>729012</project_id><text_data>Note: Fringe Med $4.81/hr, 401K $9.63/hr</text_data><comment_date>2014-07-01T00:00:00</comment_date></row><row _id="row-icp8_mwmm-h7he" _uuid="00000000-0000-0000-5155-5584DB644698" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-icp8_mwmm-h7he"><intent_id>989253</intent_id><project_id>854756</project_id><text_data>Waste Management will hire R Transport for trucking</text_data><comment_date>2019-07-02T00:00:00</comment_date></row><row _id="row-vtx9.wu6y_7u5z" _uuid="00000000-0000-0000-D647-B7057E5CCC57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vtx9.wu6y_7u5z"><intent_id>827325</intent_id><project_id>811360</project_id><text_data>Filed by Ramario Bautista</text_data><comment_date>2017-04-18T00:00:00</comment_date></row><row _id="row-6suf-ycrq-6hmj" _uuid="00000000-0000-0000-DA64-9648A4FC26FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6suf-ycrq-6hmj"><intent_id>723346</intent_id><project_id>773487</project_id><text_data>Filed by Tracy Harris</text_data><comment_date>2015-09-28T00:00:00</comment_date></row><row _id="row-w729_6rdw.dr5t" _uuid="00000000-0000-0000-9BB2-1DD52DA4CD2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w729_6rdw.dr5t"><intent_id>643205</intent_id><project_id>739584</project_id><text_data>Filed by Bryan Boe.</text_data><comment_date>2014-07-24T00:00:00</comment_date></row><row _id="row-weqz-42ph-2tyk" _uuid="00000000-0000-0000-1EB4-858C2F920C69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-weqz-42ph-2tyk"><intent_id>1116722</intent_id><project_id>903792</project_id><text_data>Technical Service: 10/28 service call -- Installed Input/Output Module</text_data><comment_date>2021-01-21T00:00:00</comment_date></row><row _id="row-8d34~eegb.tbdc" _uuid="00000000-0000-0000-D064-1561E723FC69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8d34~eegb.tbdc"><intent_id>574201</intent_id><project_id>702818</project_id><text_data>Filed by Mike Boyd.</text_data><comment_date>2013-06-10T00:00:00</comment_date></row><row _id="row-s9za-56vw~vw9n" _uuid="00000000-0000-0000-5D6D-9B207ECAE2E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s9za-56vw~vw9n"><intent_id>749493</intent_id><project_id>786404</project_id><text_data>Filed by Christopher Calderon</text_data><comment_date>2016-03-02T00:00:00</comment_date></row><row _id="row-2kdm~ipnt~dx75" _uuid="00000000-0000-0000-6C0A-1838CCCD2867" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2kdm~ipnt~dx75"><intent_id>617229</intent_id><project_id>729555</project_id><text_data>Job # 204473</text_data><comment_date>2014-02-20T00:00:00</comment_date></row><row _id="row-u95m_s8bi~enh5" _uuid="00000000-0000-0000-77ED-5809803E18C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u95m_s8bi~enh5"><intent_id>638930</intent_id><project_id>700294</project_id><text_data>It is a blower truck. 35 feet long. It blows barkfrom the back. What do the other blower truck companies submit? Can we get an actual blower truck line item so we know. It is differant every time. It is hard to bid when we do not know what we will be required to pay!</text_data><comment_date>2014-07-08T00:00:00</comment_date></row><row _id="row-9ktc_rbge_zwp7" _uuid="00000000-0000-0000-EA98-6BE3E7342EB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ktc_rbge_zwp7"><intent_id>1111648</intent_id><project_id>944525</project_id><text_data>WRI Job # 20.850/ 45751</text_data><comment_date>2020-12-23T00:00:00</comment_date></row><row _id="row-zgte_mvam-x3x3" _uuid="00000000-0000-0000-DC0B-1331DC8B7B11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zgte_mvam-x3x3"><intent_id>752614</intent_id><project_id>787800</project_id><text_data>990096703</text_data><comment_date>2016-03-22T00:00:00</comment_date></row><row _id="row-gnsh_y7d9~raik" _uuid="00000000-0000-0000-3C3B-3D4A8A86781F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gnsh_y7d9~raik"><intent_id>1126264</intent_id><project_id>952867</project_id><text_data>Invoice #175379 drain cleaning</text_data><comment_date>2021-03-03T00:00:00</comment_date></row><row _id="row-drp3.y42v.xcvm" _uuid="00000000-0000-0000-82C6-D7C52B2BEBD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-drp3.y42v.xcvm"><intent_id>690478</intent_id><project_id>760565</project_id><text_data>There will be labor if there is any additional clean up required.</text_data><comment_date>2015-04-22T00:00:00</comment_date></row><row _id="row-gs6w-2vza~npqs" _uuid="00000000-0000-0000-AE59-69353822EB4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gs6w-2vza~npqs"><intent_id>547984</intent_id><project_id>696129</project_id><text_data>8.16 - Medical11.04 - Pensions1.93 - Apprentice Training</text_data><comment_date>2012-12-11T00:00:00</comment_date></row><row _id="row-t5di.njru-c4mr" _uuid="00000000-0000-0000-775A-F860298BED81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t5di.njru-c4mr"><intent_id>684445</intent_id><project_id>757919</project_id><text_data>mow,weed,rake,edge,prune,trim,pick up litter,fix irrigation</text_data><comment_date>2015-03-18T00:00:00</comment_date></row><row _id="row-erwp.e6n4-j9ni" _uuid="00000000-0000-0000-32A8-6C0613457DA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-erwp.e6n4-j9ni"><intent_id>648967</intent_id><project_id>742243</project_id><text_data>Job Order Contract  C00651C11King County FMD</text_data><comment_date>2014-08-19T00:00:00</comment_date></row><row _id="row-54ex.pguv_xrvu" _uuid="00000000-0000-0000-0900-E8F1396D1AB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-54ex.pguv_xrvu"><intent_id>1366362</intent_id><project_id>1088751</project_id><text_data>9924499</text_data><comment_date>2023-09-23T00:00:00</comment_date></row><row _id="row-rcg9-ihst.thk4" _uuid="00000000-0000-0000-BA7C-E719B4A35E5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rcg9-ihst.thk4"><intent_id>782709</intent_id><project_id>793634</project_id><text_data>Work performed by the Telecommunication Technicians is installing Cat5e cabling for data indoors.  The purpose of the data cabling being installed is for computer networking.  Physical location is 3300 Monte Villa Parkway, Bothell, WA  98021</text_data><comment_date>2016-08-16T00:00:00</comment_date></row><row _id="row-75w8~g9ne.9g6h" _uuid="00000000-0000-0000-6E5A-C019AFFB68EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-75w8~g9ne.9g6h"><intent_id>575904</intent_id><project_id>713529</project_id><text_data>1065C-37671</text_data><comment_date>2013-06-18T00:00:00</comment_date></row><row _id="row-h8dr_s9v3_9dsn" _uuid="00000000-0000-0000-0875-C1DFEA1078D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h8dr_s9v3_9dsn"><intent_id>990712</intent_id><project_id>886777</project_id><text_data>Benton County Justice Center7122 W. Okanogan PlaceKennewick, WA 99336-2341</text_data><comment_date>2019-07-10T00:00:00</comment_date></row><row _id="row-tpr9_q4rb_2jzn" _uuid="00000000-0000-0000-FDEC-CD660B63D2E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tpr9_q4rb_2jzn"><intent_id>975457</intent_id><project_id>880111</project_id><text_data>FILED BY DANIEL R AUGUSTSON</text_data><comment_date>2019-05-02T00:00:00</comment_date></row><row _id="row-gwpz_9m34-ztvw" _uuid="00000000-0000-0000-327C-AD10D9346AA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gwpz_9m34-ztvw"><intent_id>847467</intent_id><project_id>827135</project_id><text_data>#1 - Replace bathroom &amp; laundry exhaust fans. Install new DHP &amp; thermostat #2 - Apartment #3 - 2 #4 -? --Answer �yes� or �no� to each of the following options: (a) No (b) NO (c) Yes (d) No (e) NO (f) NO (g) No (h) No (I) No (j) No (k) NO (l) NA #5 - Yes #6 - Yes #7 - Yes #8 - No</text_data><comment_date>2017-07-14T00:00:00</comment_date></row><row _id="row-jzqk~y4hj-jst7" _uuid="00000000-0000-0000-BF3F-F3D05869014C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzqk~y4hj-jst7"><intent_id>519711</intent_id><project_id>676228</project_id><text_data>Form filed by: Allison Yossler</text_data><comment_date>2012-06-29T00:00:00</comment_date></row><row _id="row-7fwj-kjrf_hjze" _uuid="00000000-0000-0000-6048-5E74E700F45C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7fwj-kjrf_hjze"><intent_id>1069046</intent_id><project_id>920980</project_id><comment_date>2020-06-30T00:00:00</comment_date></row><row _id="row-gqb4.iahs~zn2q" _uuid="00000000-0000-0000-1782-E86950467C9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqb4.iahs~zn2q"><intent_id>598695</intent_id><project_id>721755</project_id><text_data>Filed by Roger J. Merck</text_data><comment_date>2013-10-10T00:00:00</comment_date></row><row _id="row-wfv5-52tu_nzqq" _uuid="00000000-0000-0000-C2FD-05B5FA6AA213" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wfv5-52tu_nzqq"><intent_id>478165</intent_id><project_id>666125</project_id><text_data>ROLL OFF TRUCK</text_data><comment_date>2011-09-14T00:00:00</comment_date></row><row _id="row-n3sy-m482_rnd6" _uuid="00000000-0000-0000-5816-86E023CF2A2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n3sy-m482_rnd6"><intent_id>767976</intent_id><project_id>794309</project_id><text_data>Lighting upgrade in Theater</text_data><comment_date>2016-06-13T00:00:00</comment_date></row><row _id="row-iukp.gdhy-k767" _uuid="00000000-0000-0000-D684-316E11352F39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iukp.gdhy-k767"><intent_id>1206958</intent_id><project_id>993978</project_id><text_data>VE 21621</text_data><comment_date>2022-01-25T00:00:00</comment_date></row><row _id="row-ty9w.y5du.a79e" _uuid="00000000-0000-0000-6A84-2E5DBC41B4AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ty9w.y5du.a79e"><intent_id>1237015</intent_id><project_id>1009921</project_id><text_data>Colleen Post, 1713 Cooks Hill Rd #47, Centralia WA 98531Heating system 2. Single family mobile home 3. singe story 4 to live in a-7 Single family residence</text_data><comment_date>2022-05-27T00:00:00</comment_date></row><row _id="row-ueqg_brnt_qhdv" _uuid="00000000-0000-0000-705E-E6A5A5DB17AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ueqg_brnt_qhdv"><intent_id>925378</intent_id><project_id>858626</project_id><text_data>7018477 - Install power for server room</text_data><comment_date>2018-08-14T00:00:00</comment_date></row><row _id="row-48wj_uikd-njim" _uuid="00000000-0000-0000-8A98-E381BD09088D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48wj_uikd-njim"><intent_id>825034</intent_id><project_id>817494</project_id><text_data>1)We were contracted to repair the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-04-06T00:00:00</comment_date></row><row _id="row-r92t~gyem~nrqh" _uuid="00000000-0000-0000-E7A7-B73452A42561" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r92t~gyem~nrqh"><intent_id>1286568</intent_id><project_id>1042699</project_id><text_data>22-80-180The other truck will be a lowboy tractor and trailer used to haul heavy equipment to and from the project location.</text_data><comment_date>2022-11-30T00:00:00</comment_date></row><row _id="row-fm6w-pumy~3tjp" _uuid="00000000-0000-0000-26AB-C50060338FD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fm6w-pumy~3tjp"><intent_id>835311</intent_id><project_id>819667</project_id><text_data>General laborers will be hand digging Green U-Channel sign posts.</text_data><comment_date>2017-05-20T00:00:00</comment_date></row><row _id="row-s6fv.wj4s-cvgg" _uuid="00000000-0000-0000-8638-DF5384418FA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s6fv.wj4s-cvgg"><intent_id>1099955</intent_id><project_id>938235</project_id><text_data>REF PSF CONTRACTS 62343-20 AND 62344-20</text_data><comment_date>2020-10-29T00:00:00</comment_date></row><row _id="row-rqvp_kjjc~ymyr" _uuid="00000000-0000-0000-3C1D-7FBCEA09018A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rqvp_kjjc~ymyr"><intent_id>869321</intent_id><project_id>814190</project_id><text_data>1117017</text_data><comment_date>2017-10-16T00:00:00</comment_date></row><row _id="row-erv7_c8c6~6aea" _uuid="00000000-0000-0000-5895-FD5DE8C9C8C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-erv7_c8c6~6aea"><intent_id>760700</intent_id><project_id>786204</project_id><text_data>We will be repairing irrigation, Barkdusters, Inc. will install approx. 2� depth of soil and or soil amendments, Barkdusters, Inc. will install approx. 2� depth of bark, and we will be installing some plant material. Wheelbarrows, rakes, and misc. hand tools will be used.</text_data><comment_date>2016-05-06T00:00:00</comment_date></row><row _id="row-hx97.5xcr.nvmn" _uuid="00000000-0000-0000-2402-45A7D13E4158" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hx97.5xcr.nvmn"><intent_id>691037</intent_id><project_id>758919</project_id><text_data>1) Hooking up new bathroom exhaust fans2) Single Family3) 2 Stories4) a - no   b - no   c - yes   d - no   e - no   f - no   g - no   h - no   i - no   j - no   k - no6) yes7) no8) no</text_data><comment_date>2015-04-27T00:00:00</comment_date></row><row _id="row-jzw9~jdf8.sdix" _uuid="00000000-0000-0000-5D36-55C02B1DF4A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzw9~jdf8.sdix"><intent_id>1111998</intent_id><project_id>933900</project_id><text_data>F1017 TCC BLDG 5 FCU'S</text_data><comment_date>2020-12-28T00:00:00</comment_date></row><row _id="row-3acy_z7g6~7n37" _uuid="00000000-0000-0000-69ED-0B6FE1D859CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3acy_z7g6~7n37"><intent_id>551931</intent_id><project_id>700836</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-01-22T00:00:00</comment_date></row><row _id="row-ehzh.f2ic-tm8z" _uuid="00000000-0000-0000-96E3-9F769A825E67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ehzh.f2ic-tm8z"><intent_id>954692</intent_id><project_id>759924</project_id><text_data>Westcoast Contracting Inc is no longer an active business.  The business license and operations ended Nov 2017.  This project took place in 2015, when the business was still operating.  I overlooked filing the intent and now the GC has contacted me to file.  Thank you for your time to review this.If you have any questions, please call me at 425-251-8300 ext. 103.</text_data><comment_date>2019-02-25T00:00:00</comment_date></row><row _id="row-xk7y_2pi7~m89g" _uuid="00000000-0000-0000-ECAB-0B91D0AD4122" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xk7y_2pi7~m89g"><intent_id>507458</intent_id><project_id>441167</project_id><text_data>4/13/2012  The truck used for delivering materials to the job site will be a one-rear axle truck.</text_data><comment_date>2012-04-13T00:00:00</comment_date></row><row _id="row-8vk6.7pwf.9pk9" _uuid="00000000-0000-0000-CF77-BCD4BB77DE06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8vk6.7pwf.9pk9"><intent_id>697638</intent_id><project_id>763127</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2015-06-01T00:00:00</comment_date></row><row _id="row-nwms.f4ad.b8k8" _uuid="00000000-0000-0000-8D5D-5F947A340ED5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nwms.f4ad.b8k8"><intent_id>742556</intent_id><project_id>783107</project_id><text_data>Clinton, WA1. Air seal, attic			2. Single family			3. 1			4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No			5. Yes			6. Yes			7. Yes			8. No</text_data><comment_date>2016-01-20T00:00:00</comment_date></row><row _id="row-fe8s-vkwa.2q4r" _uuid="00000000-0000-0000-5D8E-F04D2AA1D66C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fe8s-vkwa.2q4r"><intent_id>801927</intent_id><project_id>805719</project_id><text_data>We are the subcontractor to Oceanside Construction. Oceanside Construction is preforming the work for the Stormwater Retrofit Project. Our portion of the contract work is to re-plant vegetation as well as place soil and bark and do the final seeding. We will be using a hydroseeder and possibly a tractor.</text_data><comment_date>2016-11-16T00:00:00</comment_date></row><row _id="row-9859.9hc8_8pnd" _uuid="00000000-0000-0000-A4AF-59DAA52202D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9859.9hc8_8pnd"><intent_id>1221481</intent_id><project_id>860697</project_id><text_data>PR51035 Convention Center</text_data><comment_date>2022-03-29T00:00:00</comment_date></row><row _id="row-f5uy~2xge~99bh" _uuid="00000000-0000-0000-5A26-276916FD1C7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f5uy~2xge~99bh"><intent_id>1260818</intent_id><project_id>1027891</project_id><text_data>BOILERMAKER BENEFIT PACKAGE PER UNION CONTRACT - RATES PER STRAIGHT TIME (REGULAR) HOUR:Health &amp; Welfare $8.57.  Pension $15.83.  Apprenticeship $1.90.  PROMO Drug &amp; Alcohol Program $0.34.  Annuity $2.25.  Vacation $4.25THIS BREAKDOWN OF BENEFITS WILL ALSO BE REPORTED ON THE CERTIFIED PAYROLL</text_data><comment_date>2022-09-09T00:00:00</comment_date></row><row _id="row-grzn~q28q.e2jj" _uuid="00000000-0000-0000-9954-663A1C1E3DA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-grzn~q28q.e2jj"><intent_id>1129683</intent_id><project_id>954785</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 6 for voice (telephone) and data (computer networking) indoors. POWERCOM JOB# 926047</text_data><comment_date>2021-03-18T00:00:00</comment_date></row><row _id="row-ywpb-rcde~4q8b" _uuid="00000000-0000-0000-E6A9-48FC56D6A0F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ywpb-rcde~4q8b"><intent_id>940652</intent_id><project_id>856416</project_id><text_data>Trucks are 12 yard end dumps, truck and trailers are 24 yard end dumps for hauling asphalt, rock and road construction related items.  Other trucks are 0 � 8,000 gallon water trucks used for road construction related items.</text_data><comment_date>2018-10-18T00:00:00</comment_date></row><row _id="row-nzce~h7tf-z9bh" _uuid="00000000-0000-0000-F68A-E1384D2439AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nzce~h7tf-z9bh"><intent_id>635893</intent_id><project_id>735159</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2014-06-18T00:00:00</comment_date></row><row _id="row-pa9u-qwcc.xtzj" _uuid="00000000-0000-0000-2BF9-8AA6CDB250AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pa9u-qwcc.xtzj"><intent_id>627855</intent_id><project_id>734218</project_id><text_data>This form is being approved on the basis that the criteria that the prevailing rate of wage/benefits listed equals or exceeds the amount published for the classification of employee listed. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.</text_data><comment_date>2015-03-11T00:00:00</comment_date></row><row _id="row-iiiv.j2qb.6qgr" _uuid="00000000-0000-0000-1ACF-FE363DA9A39C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iiiv.j2qb.6qgr"><intent_id>535960</intent_id><project_id>696176</project_id><text_data>062030</text_data><comment_date>2012-09-21T00:00:00</comment_date></row><row _id="row-jmcg_vr5u~6hyx" _uuid="00000000-0000-0000-8185-3FA89DFAA7E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jmcg_vr5u~6hyx"><intent_id>795407</intent_id><project_id>804742</project_id><text_data>Truck Driver/Other Trucks will be used for water truck.</text_data><comment_date>2016-10-27T00:00:00</comment_date></row><row _id="row-3hkw-x7xk.naj9" _uuid="00000000-0000-0000-CF7A-0828EB5BE11E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3hkw-x7xk.naj9"><intent_id>858185</intent_id><project_id>825830</project_id><text_data>No Employees</text_data><comment_date>2017-08-24T00:00:00</comment_date></row><row _id="row-feur_geek.uhyp" _uuid="00000000-0000-0000-F506-D8D689A02B80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-feur_geek.uhyp"><intent_id>1043245</intent_id><project_id>904193</project_id><text_data>WC reciprocal with Oregon</text_data><comment_date>2020-03-05T00:00:00</comment_date></row><row _id="row-xdmi.3tbv~yt9v" _uuid="00000000-0000-0000-32D4-605AE1B1085F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdmi.3tbv~yt9v"><intent_id>1102745</intent_id><project_id>939660</project_id><text_data>Job Number 20122</text_data><comment_date>2020-11-11T00:00:00</comment_date></row><row _id="row-hhk5~s3n7.mhcp" _uuid="00000000-0000-0000-6CC3-D93299BC10FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hhk5~s3n7.mhcp"><intent_id>758599</intent_id><project_id>781269</project_id><text_data>Tomas Vasquez408 W. Pine St. #79Union Gap, WA 98903509-941-1932</text_data><comment_date>2016-04-26T00:00:00</comment_date></row><row _id="row-79ca-g4xx-fyur" _uuid="00000000-0000-0000-F7BE-4F173B35BDA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-79ca-g4xx-fyur"><intent_id>565751</intent_id><project_id>708147</project_id><text_data>sole proprietor performed work</text_data><comment_date>2013-04-22T00:00:00</comment_date></row><row _id="row-j2z7-n4uy-4chu" _uuid="00000000-0000-0000-B71D-579C05EE5E3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j2z7-n4uy-4chu"><intent_id>732388</intent_id><project_id>777205</project_id><text_data>We only repaired the telecommunications cables.  The Electronic Technicians will work on the actual public address system.</text_data><comment_date>2015-12-08T00:00:00</comment_date></row><row _id="row-za39-mfst.rx2y" _uuid="00000000-0000-0000-DE15-FC52EBF96CCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-za39-mfst.rx2y"><intent_id>575029</intent_id><project_id>712319</project_id><text_data>We will be providing basis services, spreadding and gravel,laying sod</text_data><comment_date>2013-06-13T00:00:00</comment_date></row><row _id="row-bir8_wykf~j7q3" _uuid="00000000-0000-0000-9F0E-924B1752CC5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bir8_wykf~j7q3"><intent_id>717673</intent_id><project_id>758044</project_id><text_data>American Electric, Inc.  560,571-02 Industrial Insurance                         842247-00 State                         601-634-684 UBI</text_data><comment_date>2015-09-08T00:00:00</comment_date></row><row _id="row-jat2~uirt~nyzp" _uuid="00000000-0000-0000-E4C7-EE5DD702F921" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jat2~uirt~nyzp"><intent_id>600784</intent_id><project_id>722516</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2013-10-22T00:00:00</comment_date></row><row _id="row-xauf-nnb7_tnbh" _uuid="00000000-0000-0000-5BEB-BFADDEE01783" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xauf-nnb7_tnbh"><intent_id>545049</intent_id><project_id>685370</project_id><text_data>PPC J#11091</text_data><comment_date>2012-11-17T00:00:00</comment_date></row><row _id="row-qn3q_f8zq-h2uw" _uuid="00000000-0000-0000-3115-D05AFFFEE0BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qn3q_f8zq-h2uw"><intent_id>984338</intent_id><project_id>883489</project_id><text_data>Inside Electrician - Wage $44.85; District 9 $3.92; Edison Pension $7.70; NEBF $1.35; Health &amp; Welfare $9.80; Flex $1.30; Apprenticeship $.80; BLMCC $.20 (total fringe $25.07)Electronic Technician (Limited Energy) - Wage $36.00; District 9 $1.65; Edison Pension $6.63; NEBF $1.08; Health &amp; Welfare $9.80; Flex $1.30; Apprenticeship $0.75; BLMCC $0.20 (total fringe $21.41)</text_data><comment_date>2019-06-12T00:00:00</comment_date></row><row _id="row-qijb~ddmy~ezgz" _uuid="00000000-0000-0000-8E80-DB2FB7768A76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qijb~ddmy~ezgz"><intent_id>670414</intent_id><project_id>751032</project_id><text_data>Paging speakers</text_data><comment_date>2014-12-22T00:00:00</comment_date></row><row _id="row-pxke_8a9f.ej4y" _uuid="00000000-0000-0000-5E88-C71F528DF706" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pxke_8a9f.ej4y"><intent_id>700841</intent_id><project_id>764931</project_id><text_data>1)We were contracted to repair the furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2015-06-15T00:00:00</comment_date></row><row _id="row-6v2e.8cwk.965t" _uuid="00000000-0000-0000-161B-65F6A3323A82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6v2e.8cwk.965t"><intent_id>1275633</intent_id><project_id>1035898</project_id><text_data>Public note added per customer request. The address for the trailer slated for the demo is 17526 SR. 302 Gig Harbor, WA 98329</text_data><comment_date>2022-11-08T00:00:00</comment_date></row><row _id="row-3b4v~s72c.93iy" _uuid="00000000-0000-0000-BE72-DA1B81D88491" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3b4v~s72c.93iy"><intent_id>882608</intent_id><project_id>841090</project_id><text_data>01-JM02-JO</text_data><comment_date>2018-01-09T00:00:00</comment_date></row><row _id="row-j6qz_sy8k_4gky" _uuid="00000000-0000-0000-11B5-48F81A53B795" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j6qz_sy8k_4gky"><intent_id>584946</intent_id><project_id>711268</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) will perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-08-07T00:00:00</comment_date></row><row _id="row-b3g6.uyt8_czkh" _uuid="00000000-0000-0000-6872-BDFEF3317EF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b3g6.uyt8_czkh"><intent_id>647464</intent_id><project_id>741146</project_id><text_data>3949 Sammamish  PC-1</text_data><comment_date>2014-08-12T00:00:00</comment_date></row><row _id="row-rxa2.kndv_tnhv" _uuid="00000000-0000-0000-E4D9-9B9A52CFF455" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rxa2.kndv_tnhv"><intent_id>733389</intent_id><project_id>777724</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2015-11-30T00:00:00</comment_date></row><row _id="row-grxy~bwbq~8rrv" _uuid="00000000-0000-0000-FB27-7853ACC56668" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-grxy~bwbq~8rrv"><intent_id>753272</intent_id><project_id>788089</project_id><text_data>Job # 8011007</text_data><comment_date>2016-03-25T00:00:00</comment_date></row><row _id="row-5hhk.khdy~fbnj" _uuid="00000000-0000-0000-9781-588DA3BC4BC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5hhk.khdy~fbnj"><intent_id>1207715</intent_id><project_id>997249</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 6 for voice (telephone) and/or data (computer networking) indoors. POWERCOM JOB# 421104</text_data><comment_date>2022-01-28T00:00:00</comment_date></row><row _id="row-usiw.5czg.imtu" _uuid="00000000-0000-0000-E857-2B9451CE7212" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-usiw.5czg.imtu"><intent_id>640757</intent_id><project_id>732403</project_id><text_data>Form filed by: AL Morton</text_data><comment_date>2014-07-14T00:00:00</comment_date></row><row _id="row-jfhj_djm7-hkvy" _uuid="00000000-0000-0000-2777-9E6553519F1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jfhj_djm7-hkvy"><intent_id>1060589</intent_id><project_id>919618</project_id><text_data>JW, NEBF $1.73, H&amp;W $9.70, Pension $9.68, 401K $2.00, JATC $0.68.</text_data><comment_date>2020-05-27T00:00:00</comment_date></row><row _id="row-xgd9_ur2y-zaim" _uuid="00000000-0000-0000-3BEC-884DFF7BC14C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xgd9_ur2y-zaim"><intent_id>640066</intent_id><project_id>734715</project_id><text_data>The landscaping work is for the school parking lot project. This includes moving irrigation lines and sod lawn areas. We used hand tools such as shovels, rakes &amp; pipe cutters. Equipment is 90 HP or less � a small skit steer and excavator.</text_data><comment_date>2014-07-09T00:00:00</comment_date></row><row _id="row-gei6_3drw-g373" _uuid="00000000-0000-0000-922F-8DD9D72FB8E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gei6_3drw-g373"><intent_id>987841</intent_id><project_id>884418</project_id><text_data>General labor - assist operator, site clean up, etc.Other Truck - Semi-Lowboy for equip. mob, water truck for dust control, etc.</text_data><comment_date>2019-06-26T00:00:00</comment_date></row><row _id="row-yg2f.hcmh.3g3g" _uuid="00000000-0000-0000-2E1E-8E9EB00194C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yg2f.hcmh.3g3g"><intent_id>515404</intent_id><project_id>682534</project_id><text_data>This form is being approved on the basis of your statement that your employees performed no tasks which required the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.</text_data><comment_date>2012-06-13T00:00:00</comment_date></row><row _id="row-7sfc.7jms~kh3q" _uuid="00000000-0000-0000-577E-9D29D7424F5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7sfc.7jms~kh3q"><intent_id>714279</intent_id><project_id>765170</project_id><text_data>mo</text_data><comment_date>2015-08-13T00:00:00</comment_date></row><row _id="row-kbhb~x4gc-4aau" _uuid="00000000-0000-0000-E828-C9EDDF2CC737" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kbhb~x4gc-4aau"><intent_id>1134514</intent_id><project_id>957452</project_id><text_data>A.)  Repair damaged sand blast boothB.) Clean up of sand blasting material from damaged boothC.) General laborers used HEPA vacuums, brooms, and dust pans to clean the sand blasting material.</text_data><comment_date>2021-04-26T00:00:00</comment_date></row><row _id="row-fwuh.gt7d.f7f4" _uuid="00000000-0000-0000-2D38-9BF6B8FB9540" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fwuh.gt7d.f7f4"><intent_id>599234</intent_id><project_id>721951</project_id><text_data>Filed by Julie McWiggins</text_data><comment_date>2013-10-14T00:00:00</comment_date></row><row _id="row-y6as.kvuy.rwns" _uuid="00000000-0000-0000-CFAC-5E000BBA6037" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y6as.kvuy.rwns"><intent_id>1112272</intent_id><project_id>943614</project_id><text_data>This is Davis Bacon rather than prevailing wage. The wage for Davis Bacon is different than listed (Wage: 35.14 and fringe 11.18), however, it must still be filed here under L&amp;I. This page would not allow me to move on without listing King County prevailing wage.</text_data><comment_date>2020-12-29T00:00:00</comment_date></row><row _id="row-dgjd~ujab~wc5x" _uuid="00000000-0000-0000-5FD9-FDAC8CCFA82C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgjd~ujab~wc5x"><intent_id>753402</intent_id><project_id>773009</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2016-04-11T00:00:00</comment_date></row><row _id="row-psqp.fxcb-p2uv" _uuid="00000000-0000-0000-0991-9E4AF65F698D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-psqp.fxcb-p2uv"><intent_id>933269</intent_id><project_id>861588</project_id><text_data>1-Attic Insulation2-Single Family Dwelling3-1 story4-A) NO; B) NO; C) YES; D) NO; E) NO; F) NO; G) NO; H) NO; I) NO; J) NO; K) NO; L)NO5-Yes6-Yes7-No8-No</text_data><comment_date>2018-09-17T00:00:00</comment_date></row><row _id="row-jfw9-mw3k-6hr6" _uuid="00000000-0000-0000-36E7-80A89647AD24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jfw9-mw3k-6hr6"><intent_id>933458</intent_id><project_id>854337</project_id><text_data>Installed phone and data cabling for computer network and phone system at Marysville Cedarcrest Middle School for the Marysville school district. Work was completed indoors.</text_data><comment_date>2018-09-17T00:00:00</comment_date></row><row _id="row-z5vw-gdum~6xfh" _uuid="00000000-0000-0000-8D14-30EEEFC7E346" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z5vw-gdum~6xfh"><intent_id>852283</intent_id><project_id>828748</project_id><text_data>***SELF-INSURED***General Laborer: Performs work of shoveling with a hand shovel, cleaning-sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket and hand broom.Other Trucks: A Low Boy trailer used for delivery and pick up of equipment.</text_data><comment_date>2017-08-03T00:00:00</comment_date></row><row _id="row-trba.rjrv.9qms" _uuid="00000000-0000-0000-E5C7-12D2556F9A7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-trba.rjrv.9qms"><intent_id>1074772</intent_id><project_id>916957</project_id><text_data>Pick up mobile office to haul back to rental company's yard in Oregon.</text_data><comment_date>2020-07-23T00:00:00</comment_date></row><row _id="row-zgqn-fjsq_csw3" _uuid="00000000-0000-0000-9681-42A63014F50D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zgqn-fjsq_csw3"><intent_id>583763</intent_id><project_id>716357</project_id><text_data>Job # 918091</text_data><comment_date>2013-07-26T00:00:00</comment_date></row><row _id="row-uu6v.22f7.rseg" _uuid="00000000-0000-0000-7CAC-094EECC101BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uu6v.22f7.rseg"><intent_id>1047912</intent_id><project_id>906900</project_id><text_data>Semi End Dump w/ 30 yard concrete tub trailer</text_data><comment_date>2020-03-26T00:00:00</comment_date></row><row _id="row-6ptq-6uaw-nh9h" _uuid="00000000-0000-0000-485A-41F36E9F6DE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ptq-6uaw-nh9h"><intent_id>729503</intent_id><project_id>775873</project_id><text_data>Project will take place at multiple locations</text_data><comment_date>2015-11-02T00:00:00</comment_date></row><row _id="row-645m_m57c_vnnq" _uuid="00000000-0000-0000-92A9-F8CDC63779D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-645m_m57c_vnnq"><intent_id>1064950</intent_id><project_id>921942</project_id><text_data>PR18481.C.3</text_data><comment_date>2020-06-12T00:00:00</comment_date></row><row _id="row-r9rd-i7iw.jxg5" _uuid="00000000-0000-0000-C247-AC55C391B40B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9rd-i7iw.jxg5"><intent_id>1285772</intent_id><project_id>1042207</project_id><text_data>E Division St #104, Mount Vernon, WA 982741. Mechanical ventilation   2. Single family      3. 1      4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No     5. Yes      6. Yes      7. No      8. No</text_data><comment_date>2022-11-23T00:00:00</comment_date></row><row _id="row-6gxe_khst.499t" _uuid="00000000-0000-0000-F008-663AA250E3D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6gxe_khst.499t"><intent_id>1030919</intent_id><project_id>904150</project_id><text_data>Green Effects will limb-up or heavy prune trees and shrubs, remove plant material, install river rock, boulders and mulch. Green Effects will use power shears, pole pruners, hand pruners, small hand tools, rakes, shovels, wheelbarrows and maybe a mini excavator for boulder placement.</text_data><comment_date>2020-01-09T00:00:00</comment_date></row><row _id="row-du3u_8gs8~498j" _uuid="00000000-0000-0000-50D2-A290379069A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-du3u_8gs8~498j"><intent_id>1119367</intent_id><project_id>948864</project_id><text_data>1.     Weatherization 2. Y 3. 1 4. residence a.n b. n c. y d.n e. n f. n g. n h. n i. n j. n k. n l. n 5. y 6. y 7. n 8 n</text_data><comment_date>2021-02-02T00:00:00</comment_date></row><row _id="row-qbjp~g9xj_wkqz" _uuid="00000000-0000-0000-996F-BEBB68F48D2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbjp~g9xj_wkqz"><intent_id>797256</intent_id><project_id>805433</project_id><text_data>It was all done inside and we used 4PR PLENUM 24 GAUGE WIRE L6.</text_data><comment_date>2016-10-25T00:00:00</comment_date></row><row _id="row-xv6p_zfqx_wdss" _uuid="00000000-0000-0000-4720-7579BAC9276C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xv6p_zfqx_wdss"><intent_id>1204957</intent_id><project_id>995449</project_id><text_data>7025904</text_data><comment_date>2022-01-15T00:00:00</comment_date></row><row _id="row-rnrc_2thx-jz68" _uuid="00000000-0000-0000-29D4-CE9536E5A494" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rnrc_2thx-jz68"><intent_id>698099</intent_id><project_id>763793</project_id><text_data>JOB# 12886 VSAA</text_data><comment_date>2015-06-03T00:00:00</comment_date></row><row _id="row-ksta-38rk-x4n2" _uuid="00000000-0000-0000-96E1-78840105962D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ksta-38rk-x4n2"><intent_id>802283</intent_id><project_id>798148</project_id><text_data>Fence Erectors are the normal classification but due to federal funding must use General Laborer (Fence Laborer)</text_data><comment_date>2016-11-18T00:00:00</comment_date></row><row _id="row-db59.gx5f.cym8" _uuid="00000000-0000-0000-1E34-FF910C10E16A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-db59.gx5f.cym8"><intent_id>656651</intent_id><project_id>745176</project_id><text_data>PC 6 P.O.  2871400008</text_data><comment_date>2014-09-24T00:00:00</comment_date></row><row _id="row-5nau~kysd_twd6" _uuid="00000000-0000-0000-2363-CD68903D287D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5nau~kysd_twd6"><intent_id>1160693</intent_id><project_id>959281</project_id><text_data>7024837</text_data><comment_date>2021-07-15T00:00:00</comment_date></row><row _id="row-nymr-5wk3_yz47" _uuid="00000000-0000-0000-E54D-DB58B4B6C912" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nymr-5wk3_yz47"><intent_id>1268559</intent_id><project_id>1001846</project_id><comment_date>2022-09-21T00:00:00</comment_date></row><row _id="row-8x9z_q855-zizt" _uuid="00000000-0000-0000-A5D8-5F25306A027D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8x9z_q855-zizt"><intent_id>1146649</intent_id><project_id>963439</project_id><text_data>Replace conveyor drive block  and crankarm  Socket set, allen wrenches, standard screwdriver and hammer</text_data><comment_date>2021-05-21T00:00:00</comment_date></row><row _id="row-46pn-p4ej.mb6v" _uuid="00000000-0000-0000-C6EA-638905BBB4BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-46pn-p4ej.mb6v"><intent_id>635137</intent_id><project_id>737114</project_id><text_data>Installed 10 new data drops at schools and relocated 9 wireless drops at the same schools.</text_data><comment_date>2014-06-16T00:00:00</comment_date></row><row _id="row-89d3~vbdw_phmm" _uuid="00000000-0000-0000-B817-7ACDD29FD7F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89d3~vbdw_phmm"><intent_id>995194</intent_id><project_id>888499</project_id><text_data>9539359</text_data><comment_date>2019-07-29T00:00:00</comment_date></row><row _id="row-eq2m_uwua-n4gz" _uuid="00000000-0000-0000-9051-55F1B5C276DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eq2m_uwua-n4gz"><intent_id>836805</intent_id><project_id>822855</project_id><text_data>Remove and replace existing 6 space main lug only electrical panel w/ Square D Qo 24 space as per proposal. ( 1174310)</text_data><comment_date>2017-05-30T00:00:00</comment_date></row><row _id="row-zrit_sy3d_893n" _uuid="00000000-0000-0000-8BE6-76AAEA2C2435" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zrit_sy3d_893n"><intent_id>605719</intent_id><project_id>724418</project_id><text_data>French drain was installed in  garden beds</text_data><comment_date>2013-12-12T00:00:00</comment_date></row><row _id="row-ji2b.qhd8~49xg" _uuid="00000000-0000-0000-5393-3B0DA8209DFB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ji2b.qhd8~49xg"><intent_id>1143666</intent_id><project_id>961837</project_id><text_data>1)Remove &amp; reinstall gas water heater2)Single Family dwelling3)1 Story4a)No , b)No, c)Yes, d)No, e)No, f)No, g)No, h)No, I)No, j)No, k)No, l)No,5)Yes6)Yes7)No8)No</text_data><comment_date>2021-05-11T00:00:00</comment_date></row><row _id="row-96qe-tdpi-sc24" _uuid="00000000-0000-0000-6E12-ACC11A7A379D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96qe-tdpi-sc24"><intent_id>631536</intent_id><project_id>735734</project_id><text_data>Blairco Job 14-5720#1-Supply and Install Ductless Heat Pump#2-Duplex#3-1#4-(a)No(b)No(c)Yes(d)No(e)No(f)No(g)No(h)No(I)No(j)No(k)Unknow#5-Yes#6-Yes#7-No#8-No</text_data><comment_date>2014-05-27T00:00:00</comment_date></row><row _id="row-s8fa.igi7-5b9v" _uuid="00000000-0000-0000-C343-74BB32E57549" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s8fa.igi7-5b9v"><intent_id>636035</intent_id><project_id>736266</project_id><text_data>Garcia 810 S Hwy 24 #10 othello</text_data><comment_date>2014-06-18T00:00:00</comment_date></row><row _id="row-6fei_5y5y~iuaw" _uuid="00000000-0000-0000-B98D-948B61928F4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6fei_5y5y~iuaw"><intent_id>795893</intent_id><project_id>804927</project_id><text_data>Sewage cleanup.  Extractor, shovels, rakes, gloves, PPE, face masks.</text_data><comment_date>2016-10-13T00:00:00</comment_date></row><row _id="row-z22u_amu6.5d53" _uuid="00000000-0000-0000-B4BD-AD3935A2FB72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z22u_amu6.5d53"><intent_id>1101172</intent_id><project_id>927507</project_id><text_data>Fringe consists of $11.81 Medical and $8.16 Pension.</text_data><comment_date>2020-11-04T00:00:00</comment_date></row><row _id="row-3g7i~8qtv_yh94" _uuid="00000000-0000-0000-1523-62581450C6CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3g7i~8qtv_yh94"><intent_id>983250</intent_id><project_id>809779</project_id><text_data>All Fringe paid as Cash.  No deductions</text_data><comment_date>2019-06-07T00:00:00</comment_date></row><row _id="row-7uxb-x2vc-q6pe" _uuid="00000000-0000-0000-8C15-A87DCDA1A2EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7uxb-x2vc-q6pe"><intent_id>747457</intent_id><project_id>764171</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2016-02-18T00:00:00</comment_date></row><row _id="row-afuc_mbhv.y6sy" _uuid="00000000-0000-0000-9A88-969D837A22E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-afuc_mbhv.y6sy"><intent_id>994152</intent_id><project_id>888115</project_id><text_data>PROJECT IS EXEMPT FROM STATE PREVAILING WAGE REQUIREMENTS BASED ON THE HOUSING ACT OF 1937 AND 24 CFR 965,101. WORKERS WILL BE PAID IN ACCORDANCE WITH DAVIS BACON WAGE REQUIREMENTS FOR THE FOLLOWING CRAFTS/TRADES/OCCUPATIONS.</text_data><comment_date>2019-07-24T00:00:00</comment_date></row><row _id="row-xbyh_9g3u~drvw" _uuid="00000000-0000-0000-0DB1-40BF1397D873" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xbyh_9g3u~drvw"><intent_id>659266</intent_id><project_id>746186</project_id><text_data>$4.90 Fringe:  Enrolled employees for Medical/Health ProgramLaborer:  ShovelDump Truck and Trailer:  Mob Equipment</text_data><comment_date>2014-10-08T00:00:00</comment_date></row><row _id="row-3ub7_x9c4~zuiu" _uuid="00000000-0000-0000-7033-1D46018DBEB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ub7_x9c4~zuiu"><intent_id>951710</intent_id><project_id>861417</project_id><text_data>Delores Degamage4803 Ahtanum Rd. #17Yakima, WA 98903</text_data><comment_date>2018-12-20T00:00:00</comment_date></row><row _id="row-9h7e-bk53~7z35" _uuid="00000000-0000-0000-2A5A-107432F0B75B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9h7e-bk53~7z35"><intent_id>1083873</intent_id><project_id>930702</project_id><text_data>WO 340416Inv SM225879-212</text_data><comment_date>2020-08-27T00:00:00</comment_date></row><row _id="row-y2ke~fjpy-tndu" _uuid="00000000-0000-0000-21DD-C94C6F165380" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y2ke~fjpy-tndu"><intent_id>479300</intent_id><project_id>453873</project_id><text_data>The prevailing wage rate is higher than the stated prevailing wage due to labor increases since this project was started.</text_data><comment_date>2011-09-21T00:00:00</comment_date></row><row _id="row-udfn_csny_kyer" _uuid="00000000-0000-0000-C92B-39405A42A70D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-udfn_csny_kyer"><intent_id>847032</intent_id><project_id>826954</project_id><text_data>Job Order Contract (JOC)  Construction Services for Facilities Maintenance and OperationsContract No. RTA/CN 0164-15Work Order No.  021 - CCE 73470-0027</text_data><comment_date>2017-07-12T00:00:00</comment_date></row><row _id="row-274e_iwtt.ev98" _uuid="00000000-0000-0000-B61A-DBD02A83A5D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-274e_iwtt.ev98"><intent_id>461212</intent_id><project_id>606246</project_id><text_data>The purpose of this project is to make additions and modernizations to Hiawatha Elementary School.  Perez Irrigation will do the landscape portion of the project, w</text_data><comment_date>2011-06-16T00:00:00</comment_date></row><row _id="row-rkpy.zygx~2jy3" _uuid="00000000-0000-0000-E0EB-EEED3D264A9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rkpy.zygx~2jy3"><intent_id>865321</intent_id><project_id>827771</project_id><text_data>We have workers comp insurance in Oregon with liberty mutual</text_data><comment_date>2017-09-26T00:00:00</comment_date></row><row _id="row-wz6h~54i4.6spt" _uuid="00000000-0000-0000-9F7A-85B9151F4747" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wz6h~54i4.6spt"><intent_id>846565</intent_id><project_id>826789</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2017-07-11T00:00:00</comment_date></row><row _id="row-kx8n_556f_ebkd" _uuid="00000000-0000-0000-07B1-41CE2D7FD24B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kx8n_556f_ebkd"><intent_id>1004334</intent_id><project_id>880456</project_id><text_data>HIRED BY SUPERIOR EARTHWORKS</text_data><comment_date>2019-09-03T00:00:00</comment_date></row><row _id="row-7p9n.xcxb-jehp" _uuid="00000000-0000-0000-F2FF-8A8ED4FE3EF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7p9n.xcxb-jehp"><intent_id>1135808</intent_id><project_id>958166</project_id><text_data>Incorrect contract award date. Had to file new Intent</text_data><comment_date>2021-04-14T00:00:00</comment_date></row><row _id="row-s8vk_b3re~u7tn" _uuid="00000000-0000-0000-B5F7-9EC64052B8EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s8vk_b3re~u7tn"><intent_id>1094478</intent_id><project_id>935599</project_id><text_data>9853027</text_data><comment_date>2020-10-08T00:00:00</comment_date></row><row _id="row-8qmz_vi7s~i54d" _uuid="00000000-0000-0000-3752-167147973157" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8qmz_vi7s~i54d"><intent_id>503121</intent_id><project_id>673031</project_id><text_data>S.S. Framing,Inc. is Union and the above wage and fringe are correct.</text_data><comment_date>2012-03-07T00:00:00</comment_date></row><row _id="row-vn58_wn9u.byyd" _uuid="00000000-0000-0000-10E1-F159223EA126" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vn58_wn9u.byyd"><intent_id>741502</intent_id><project_id>782637</project_id><text_data>PC 6 JOB 902-16</text_data><comment_date>2016-01-13T00:00:00</comment_date></row><row _id="row-sptz-tqtj-fy2x" _uuid="00000000-0000-0000-0FAD-18901D60F60B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sptz-tqtj-fy2x"><intent_id>857463</intent_id><project_id>827146</project_id><text_data>0417249</text_data><comment_date>2017-08-22T00:00:00</comment_date></row><row _id="row-tmri~2ccf~tf85" _uuid="00000000-0000-0000-FA39-4A84355359AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tmri~2ccf~tf85"><intent_id>1183550</intent_id><project_id>982537</project_id><text_data>S031235</text_data><comment_date>2021-10-06T00:00:00</comment_date></row><row _id="row-8e8d.vy2m.peh9" _uuid="00000000-0000-0000-C5D1-65A07AB83C20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8e8d.vy2m.peh9"><intent_id>839228</intent_id><project_id>818219</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2017-06-30T00:00:00</comment_date></row><row _id="row-gcw9_hrgh.84q6" _uuid="00000000-0000-0000-3A7E-CBC79FF61EA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcw9_hrgh.84q6"><intent_id>907294</intent_id><project_id>850220</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK &amp;quot;POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)&amp;quot; USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2018-05-29T00:00:00</comment_date></row><row _id="row-3fxk_nhme-g3mm" _uuid="00000000-0000-0000-5C8E-CC9D3F01DF1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3fxk_nhme-g3mm"><intent_id>1027377</intent_id><project_id>882064</project_id><text_data>'TRUCK DRIVER - OTHER' USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK</text_data><comment_date>2019-12-26T00:00:00</comment_date></row><row _id="row-isbt_6tgh_9dpb" _uuid="00000000-0000-0000-95EA-68219B6995E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-isbt_6tgh_9dpb"><intent_id>1163113</intent_id><project_id>972111</project_id><text_data>? Cross-connect phone line for a copier/fax machine move in medical records room.</text_data><comment_date>2021-07-23T00:00:00</comment_date></row><row _id="row-q5yd.8imu~a5cf" _uuid="00000000-0000-0000-2645-8B3E0DE9DCDE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5yd.8imu~a5cf"><intent_id>629010</intent_id><project_id>734726</project_id><text_data>Filed by:  Annie StewartIn order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions in the notes section at the bottom of this screen: #1 - Describe the work that your firm was contracted to perform. Insulation. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single family. #3 - Including any basement or garage, how many stories or levels does the structure have? One. #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No. (b) Any retail use in the structure? No. (c) Permanent residence only? Yes. (d) Rehabilitation house? No. (e) Transitional housing? No. (f) Communal dining facility? No. (g) Treatment services? No. (h) Dormitories? No. (i) Counseling? No. (j) Is each room and/or bed in the structure rented separately? N/A. (k) Other? N/A. #5 - Does each dwelling unit have its own self-contained kitchen? N/A. #6 - Does each dwelling unit have its own bathroom? N/A. #7 - Is there a community facility or manager�s office on site? N/A. #8 - Is any part of the structure used by members of the public? No.</text_data><comment_date>2014-06-09T00:00:00</comment_date></row><row _id="row-67xt.j6pk.5hig" _uuid="00000000-0000-0000-B2DF-0B92FD6BA154" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-67xt.j6pk.5hig"><intent_id>563175</intent_id><project_id>704980</project_id><text_data>FRINGE RATE:PENSION:         9.20H &amp; W:           6.77APPR:             .63ANNUITY          4.00IMP:              .28IND:              .01TOTAL FRINGE:   20.89</text_data><comment_date>2013-04-05T00:00:00</comment_date></row><row _id="row-ncx2.9b6c_9xnv" _uuid="00000000-0000-0000-D6A2-BBA8C2691CD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ncx2.9b6c_9xnv"><intent_id>987184</intent_id><project_id>884411</project_id><text_data>Power wash track using power washers and laymor in preparation of top coats</text_data><comment_date>2019-06-24T00:00:00</comment_date></row><row _id="row-xzrv-tf4t.7nkv" _uuid="00000000-0000-0000-05C4-0D5731AB6297" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xzrv-tf4t.7nkv"><intent_id>848183</intent_id><project_id>827432</project_id><text_data>Filed by Richard Fleming.</text_data><comment_date>2017-07-18T00:00:00</comment_date></row><row _id="row-5ht5-a78t-vwfe" _uuid="00000000-0000-0000-E71F-955B145E8E92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ht5-a78t-vwfe"><intent_id>716170</intent_id><project_id>766949</project_id><text_data>Filed by Fred Zittleman</text_data><comment_date>2015-08-24T00:00:00</comment_date></row><row _id="row-4rew-rtnp.fbit" _uuid="00000000-0000-0000-8D1E-5CE5287E484D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4rew-rtnp.fbit"><intent_id>1163497</intent_id><project_id>972290</project_id><comment_date>2021-07-26T00:00:00</comment_date></row><row _id="row-qza3_x2zj.qsr8" _uuid="00000000-0000-0000-580D-F0D32E47E5DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qza3_x2zj.qsr8"><intent_id>894550</intent_id><project_id>846584</project_id><text_data>Filed by Jack Shepherd</text_data><comment_date>2018-03-23T00:00:00</comment_date></row><row _id="row-d7q7~ecv2-4hn3" _uuid="00000000-0000-0000-585F-144B16E64D8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7q7~ecv2-4hn3"><intent_id>658579</intent_id><project_id>736591</project_id><text_data>roofer - journey man $12.12 hourly pension $4.77 hourly medical $6.90 approved apprentice program $.045</text_data><comment_date>2014-10-06T00:00:00</comment_date></row><row _id="row-v6sp_ude2_mk6n" _uuid="00000000-0000-0000-689D-C0128D85FB70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v6sp_ude2_mk6n"><intent_id>788109</intent_id><project_id>799044</project_id><text_data>We are an Idaho based business for Industrial Insurance</text_data><comment_date>2016-10-21T00:00:00</comment_date></row><row _id="row-872v_sswy~i26s" _uuid="00000000-0000-0000-35C7-A3B20DBC551B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-872v_sswy~i26s"><intent_id>480873</intent_id><project_id>675360</project_id><text_data>Kitsap County lighting upgrades at our Juvenile Detention Center and Fairgrounds.</text_data><comment_date>2011-09-28T00:00:00</comment_date></row><row _id="row-8mjc_7h97~naug" _uuid="00000000-0000-0000-D7AA-B434F7FA1A79" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8mjc_7h97~naug"><intent_id>693574</intent_id><project_id>760591</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements</text_data><comment_date>2015-05-08T00:00:00</comment_date></row><row _id="row-mr8f_28e8_5usi" _uuid="00000000-0000-0000-F70D-20C405F51937" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mr8f_28e8_5usi"><intent_id>757370</intent_id><project_id>789901</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2016-04-19T00:00:00</comment_date></row><row _id="row-ht87~adp8.ztqr" _uuid="00000000-0000-0000-990D-0EFB5326BA79" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ht87~adp8.ztqr"><intent_id>1196701</intent_id><project_id>988559</project_id><text_data>Other truck details:19,000 GVW2016 hinoPurpose: Stocking materials and scrap out construction debris</text_data><comment_date>2021-12-02T00:00:00</comment_date></row><row _id="row-h3ud~55jd~e7ya" _uuid="00000000-0000-0000-6191-A8F752850C82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h3ud~55jd~e7ya"><intent_id>623747</intent_id><project_id>732517</project_id><text_data>GENERAL LABORERS USE HAND TOOLS SUCH AS SHOVELS AND RAKE AND DO MANUAL TASKS SUCH AS INSTALLING SILT FENCE AND HAY. OTHER TRUCKS INCLUDE LOWBOY AND/OR WATERTRUCKS.</text_data><comment_date>2014-04-07T00:00:00</comment_date></row><row _id="row-czzh~4tje_89ek" _uuid="00000000-0000-0000-D477-443A9465548B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-czzh~4tje_89ek"><intent_id>1022592</intent_id><project_id>899956</project_id><text_data>9838843</text_data><comment_date>2019-11-19T00:00:00</comment_date></row><row _id="row-tgiy-cykc~2ihw" _uuid="00000000-0000-0000-BAEF-9FF3DBEE1F52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tgiy-cykc~2ihw"><intent_id>1248986</intent_id><project_id>1018616</project_id><text_data>job number 0422578</text_data><comment_date>2022-07-14T00:00:00</comment_date></row><row _id="row-7zaq~msja-96ib" _uuid="00000000-0000-0000-ADFF-C53C17291512" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zaq~msja-96ib"><intent_id>1205707</intent_id><project_id>995937</project_id><text_data>#1-We were contracted to REPLACE THE FURNACE. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2022-01-19T00:00:00</comment_date></row><row _id="row-jvsx_gefa-uh8u" _uuid="00000000-0000-0000-E877-94E88D7B9CAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jvsx_gefa-uh8u"><intent_id>583451</intent_id><project_id>711525</project_id><text_data>FORM FILED BY: RICHARD A. GUSHMAN</text_data><comment_date>2013-07-25T00:00:00</comment_date></row><row _id="row-74mm-ne5p-wsvc" _uuid="00000000-0000-0000-9A15-5E648447FD23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74mm-ne5p-wsvc"><intent_id>765688</intent_id><project_id>793444</project_id><text_data>302252</text_data><comment_date>2016-06-02T00:00:00</comment_date></row><row _id="row-j3me-nvuj~4583" _uuid="00000000-0000-0000-21AD-C8C55BEBB353" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j3me-nvuj~4583"><intent_id>775865</intent_id><project_id>797360</project_id><text_data>Dig irrigation trench in the NW part of park area using 45hp walk behind dingo with trenching attachment.  Dig trench to a depth of 18&amp;quot;</text_data><comment_date>2016-07-19T00:00:00</comment_date></row><row _id="row-iijr_93bd-2jes" _uuid="00000000-0000-0000-B7ED-DBCEFB4CD9AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iijr_93bd-2jes"><intent_id>1216408</intent_id><project_id>1002690</project_id><text_data>We are signatory with IBEW Local union 112 and all of our benefits are paid as such</text_data><comment_date>2022-03-08T00:00:00</comment_date></row><row _id="row-vnrg~2rkw_ttxs" _uuid="00000000-0000-0000-D009-1EE095004831" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vnrg~2rkw_ttxs"><intent_id>990219</intent_id><project_id>878466</project_id><text_data>Bid Package #138747-OS; Access Road</text_data><comment_date>2019-07-08T00:00:00</comment_date></row><row _id="row-yphp_ib7r~vni2" _uuid="00000000-0000-0000-F586-1AD4C9CD6725" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yphp_ib7r~vni2"><intent_id>1281765</intent_id><project_id>1039781</project_id><text_data>Franklin HS #303816</text_data><comment_date>2022-11-07T00:00:00</comment_date></row><row _id="row-5237-4wxe~cy36" _uuid="00000000-0000-0000-C954-E630DD51D409" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5237-4wxe~cy36"><intent_id>695300</intent_id><project_id>762600</project_id><text_data>Add sandy loam to existing football fields and overseeding &amp; fertilizing.  Landscaping only.New top soil of 1/2 inch spread using a top dressing machine (like a fertilizer spreader).</text_data><comment_date>2015-05-19T00:00:00</comment_date></row><row _id="row-cd3q_cd8t-e4qd" _uuid="00000000-0000-0000-D9D0-DE12C57486F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cd3q_cd8t-e4qd"><intent_id>729829</intent_id><project_id>776023</project_id><text_data>Inside workElect Tech(06)</text_data><comment_date>2015-11-04T00:00:00</comment_date></row><row _id="row-zizu~rugk-xvbi" _uuid="00000000-0000-0000-2926-7C80FA12D499" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zizu~rugk-xvbi"><intent_id>1287267</intent_id><project_id>1009427</project_id><text_data>We do not have any employees that are residents of Wa State- Workers Comp Carrier- Chubb Indemnity</text_data><comment_date>2022-12-02T00:00:00</comment_date></row><row _id="row-f7hg~4vhc-pqi9" _uuid="00000000-0000-0000-6B1E-2832FC3A95E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f7hg~4vhc-pqi9"><intent_id>696292</intent_id><project_id>759611</project_id><text_data>We will be planting 11 trees, 350 shrubs, drip irrigation topsoil and bark.  No heavy equipment, no Bobcat skid street.  All  hand labor.  There is no room to use Bobcat.</text_data><comment_date>2015-05-24T00:00:00</comment_date></row><row _id="row-r3v5~s3x2-ju4q" _uuid="00000000-0000-0000-4123-4E16FD46CF42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r3v5~s3x2-ju4q"><intent_id>948674</intent_id><project_id>864244</project_id><text_data>Our duties for this project were to bring playground material in our truck to the facility where everything was marked and ready for the Swanson employees (Truck Driver/Dump truck/Trailer &amp; Landscape Construction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used.Truck = KENWORTH T-800 4 axleTrailer = IMCO live floor trailer 48�This truck was used to deliver Engineered Wood Fiber (a type of Playground Chip). Material was delivered using our blower trailer to blow material into designated areas specified by the Prime Contractor.No other tools, etc. are used</text_data><comment_date>2018-12-03T00:00:00</comment_date></row><row _id="row-uafu-igs6~ebvm" _uuid="00000000-0000-0000-D61F-BD9D4BE5638B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uafu-igs6~ebvm"><intent_id>863451</intent_id><project_id>830123</project_id><text_data>#1 - Add circuits for ductless heat pump in each of 21 apartment units #2 - apartment #3 - I4 #4 - What is the building used for? --(a) No (b) No (c) Yes (d) No (e) No (f) No (g) NO (h) NO (I) NO (j) No (k) No (l) NA #5 - Yes #6 - Yes #7 - Yes #8 - NO</text_data><comment_date>2017-09-18T00:00:00</comment_date></row><row _id="row-vdcg_8fuj-s7pr" _uuid="00000000-0000-0000-2A90-49FD3EA3A320" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vdcg_8fuj-s7pr"><intent_id>657854</intent_id><project_id>745620</project_id><text_data>Inside plant Horizontal pathways pull term and test computer data cable</text_data><comment_date>2014-10-01T00:00:00</comment_date></row><row _id="row-jq35_hmvs~nsyp" _uuid="00000000-0000-0000-8AD6-49E42EA61DE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jq35_hmvs~nsyp"><intent_id>1252711</intent_id><project_id>815868</project_id><text_data>Railworks is filing on behalf of Deangelo Brothers LLC due to ceased operations.UBI 603-411-811, Cont Reg DEANGBL865RC, 100 N CONAHAN DR,  Hazleton, PA, 18201</text_data><comment_date>2022-07-27T00:00:00</comment_date></row><row _id="row-ky3e-qijj.2mv6" _uuid="00000000-0000-0000-6287-391F890DF4FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ky3e-qijj.2mv6"><intent_id>1175434</intent_id><project_id>889036</project_id><text_data>Our general laborers unload and distribute cabinets from our delivery truck to various rooms on the jobsite. The only tools used are hand trucks and rolling carts.Our trucks are 14� and 26� box trucks for delivery of cabinets.</text_data><comment_date>2021-09-07T00:00:00</comment_date></row><row _id="row-gcq8.776h-t5vg" _uuid="00000000-0000-0000-E973-93F187CC746D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcq8.776h-t5vg"><intent_id>867754</intent_id><project_id>832953</project_id><text_data>ACI Job No. 17-029</text_data><comment_date>2017-10-09T00:00:00</comment_date></row><row _id="row-6bgz-wapg~c94z" _uuid="00000000-0000-0000-85D4-66F4BB753574" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6bgz-wapg~c94z"><intent_id>576155</intent_id><project_id>689035</project_id><text_data>1065C-37674</text_data><comment_date>2013-06-19T00:00:00</comment_date></row><row _id="row-4pz9~ynhh_xa9k" _uuid="00000000-0000-0000-EF34-16970880BFFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4pz9~ynhh_xa9k"><intent_id>1238909</intent_id><project_id>1013105</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Replace bath fan.  #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? YES, SINLE FAMILY RESDIDENCE#3 - Including any basement or garage, how many stories or levels does the structure have? 2#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(I) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO(l) Other? NONE#5 - Does each dwelling unit have its own self-contained kitchen? NO#6 - Does each dwelling unit have its own bathroom? NO#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2022-06-06T00:00:00</comment_date></row><row _id="row-urs5-umaz_tzu9" _uuid="00000000-0000-0000-B488-88D984DA2BB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-urs5-umaz_tzu9"><intent_id>1181552</intent_id><project_id>921206</project_id><text_data>Health &amp; Welfare - $7.20Pension - $5.04Apprenticeship Training - $.95Northwest Laborers-Employers Cooperation and Education Team - $.14Washington Construction Industry Substance Abuse Program - $.06</text_data><comment_date>2021-10-06T00:00:00</comment_date></row><row _id="row-zig7_gkbc~smzd" _uuid="00000000-0000-0000-3F24-D9BB3A4C3DD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zig7_gkbc~smzd"><intent_id>832693</intent_id><project_id>760591</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project? Provide and install HVAC DDC Control System2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. No3. Does this specific project entail the remodeling or new construction of a facility? Remodeling4. If your firm is working upon a type of building system, what type of system is involved? HVAC Direct Digital Control Systems5. What specific tasks will your employees perform? Engineering, programming, component testing and operation verification6. What, if any, tools will your employees use in the performance of those tasks? Laptop and software7. If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? Interface to system using laptop computers and software for programming, checkout and commissioning.8. Are you going to be hiring any subcontractors for this project? No</text_data><comment_date>2017-06-12T00:00:00</comment_date></row><row _id="row-tema_f76q-cu4w" _uuid="00000000-0000-0000-163D-43916823ECE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tema_f76q-cu4w"><intent_id>617035</intent_id><project_id>729474</project_id><text_data>Prime Job# 5142634 - troubleshoot cabling in kitchen</text_data><comment_date>2014-02-20T00:00:00</comment_date></row><row _id="row-s96e~apzv~feyy" _uuid="00000000-0000-0000-C869-C323E1E9AD44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s96e~apzv~feyy"><intent_id>1040525</intent_id><project_id>909608</project_id><text_data>This is a re-do of Intent #1032523 because I forgot to list prevailing wages for erosion control.</text_data><comment_date>2020-02-24T00:00:00</comment_date></row><row _id="row-q9pm_afey-ujv3" _uuid="00000000-0000-0000-A068-5C74707B2FD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9pm_afey-ujv3"><intent_id>985276</intent_id><project_id>879207</project_id><text_data>Synthetic Track Surfacing</text_data><comment_date>2019-06-17T00:00:00</comment_date></row><row _id="row-8csw~u6q9~wpdk" _uuid="00000000-0000-0000-AF1B-1EBC4AA2FF95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8csw~u6q9~wpdk"><intent_id>678102</intent_id><project_id>749722</project_id><text_data>Install Insulation, Single Family, Single Story, No, No, Yes, No, No, No, No, No, No, No, No, Yes, Yes, No, No.</text_data><comment_date>2015-02-06T00:00:00</comment_date></row><row _id="row-svmb-n5ed~b7u5" _uuid="00000000-0000-0000-3365-1F887AB292E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-svmb-n5ed~b7u5"><intent_id>700290</intent_id><project_id>713422</project_id><text_data>Form filed by:  Robert Jones</text_data><comment_date>2015-06-12T00:00:00</comment_date></row><row _id="row-du8i-35wf~n3a2" _uuid="00000000-0000-0000-B697-D5D6908B88BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-du8i-35wf~n3a2"><intent_id>967673</intent_id><project_id>872719</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2019-03-26T00:00:00</comment_date></row><row _id="row-ctac_3dc6-nitp" _uuid="00000000-0000-0000-142E-DD18B9530DDC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ctac_3dc6-nitp"><intent_id>640059</intent_id><project_id>722690</project_id><text_data>Total scope of project is to constuct a new intersection.  deWilde's will be repairing irrigation and lawns.  Equipment includes an S-130 Bobcat and KX 121-3 Excavator - plus wheelbarrows, lawn rollers ad misc hand tools.</text_data><comment_date>2014-07-09T00:00:00</comment_date></row><row _id="row-p94r-siru~asfy" _uuid="00000000-0000-0000-5A11-B86E5FCAE521" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p94r-siru~asfy"><intent_id>517641</intent_id><project_id>688373</project_id><text_data>THE OTHER TRUCK DRIVER IS FOR OUR SEMI TRUCK DRIVERS WHO WILL BE HAULING BARRIER ON THE PROJECT.</text_data><comment_date>2012-06-25T00:00:00</comment_date></row><row _id="row-rnr6~4cdr~63wu" _uuid="00000000-0000-0000-8CDD-BE65ECA3FB9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rnr6~4cdr~63wu"><intent_id>697949</intent_id><project_id>763186</project_id><text_data>Fringe to be paid in cash on the check</text_data><comment_date>2015-06-02T00:00:00</comment_date></row><row _id="row-5sf7_w5ff-a9y4" _uuid="00000000-0000-0000-C6AC-CEDA01EAA9E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5sf7_w5ff-a9y4"><intent_id>725289</intent_id><project_id>774239</project_id><text_data>Single family residence, weatherization/insulation upgrade</text_data><comment_date>2015-10-08T00:00:00</comment_date></row><row _id="row-qajk.yeku-cryf" _uuid="00000000-0000-0000-7782-96BDC0D0140D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qajk.yeku-cryf"><intent_id>773857</intent_id><project_id>795945</project_id><text_data>correct wage  for power equipment operators  motor patrol graders finishing per hour is 56.94  8 hours and .5o overtime</text_data><comment_date>2016-08-24T00:00:00</comment_date></row><row _id="row-5m3x-hr4v~2knk" _uuid="00000000-0000-0000-3BC8-B36D8635F181" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5m3x-hr4v~2knk"><intent_id>865385</intent_id><project_id>821923</project_id><text_data>Other truck lowboy- other truck water truck</text_data><comment_date>2017-09-27T00:00:00</comment_date></row><row _id="row-2pzc_22sm-prsc" _uuid="00000000-0000-0000-F4C5-968A59CB8833" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2pzc_22sm-prsc"><intent_id>793336</intent_id><project_id>803981</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 5e for voice (telephone) and data (computer networking ) indoors.  Physical location: 5950 Delridge Way SW, Seattle, WA 98106</text_data><comment_date>2016-10-03T00:00:00</comment_date></row><row _id="row-xv8j_aaep~yf4x" _uuid="00000000-0000-0000-C7EE-F59820510E8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xv8j_aaep~yf4x"><intent_id>1023165</intent_id><project_id>900206</project_id><text_data>Add some IP Valcom audio gateways and speakers. All work inside. Program customers Valcom intercom/emergency notification system to accommodate changes in hardware and software. Use computer and common hand tools, such as screw driver and pliers.</text_data><comment_date>2019-11-21T00:00:00</comment_date></row><row _id="row-dvnx-cmx3~nxma" _uuid="00000000-0000-0000-9FCD-83E876CA383D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dvnx-cmx3~nxma"><intent_id>911360</intent_id><project_id>853440</project_id><text_data>replace defective thermostat on gas furnace.</text_data><comment_date>2018-06-14T00:00:00</comment_date></row><row _id="row-dta2.yvdd~36gf" _uuid="00000000-0000-0000-2081-9846292DBCBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dta2.yvdd~36gf"><intent_id>805427</intent_id><project_id>802455</project_id><text_data>Nellie Whitney1130 N Wenas Rd Selah, WA 98942#1 Replace bath fan &amp; Kitchen hood fan. #2 Single family mobile home. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2016-12-04T00:00:00</comment_date></row><row _id="row-tytb-h85j-nnzz" _uuid="00000000-0000-0000-76D6-88CAE5499489" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tytb-h85j-nnzz"><intent_id>647102</intent_id><project_id>741192</project_id><text_data>General Labor - assist with site clean up etc.Other Truck - Water truck for dust control, semi-lowboy for mobilization, etc.</text_data><comment_date>2014-08-11T00:00:00</comment_date></row><row _id="row-xmnb.2q4m_dpc3" _uuid="00000000-0000-0000-7BC9-03FF2BAD7A3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xmnb.2q4m_dpc3"><intent_id>665036</intent_id><project_id>748554</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NOSHIRLEY WOOD8527 31ST AVE CT S #34LAKEWOOD</text_data><comment_date>2014-11-11T00:00:00</comment_date></row><row _id="row-ernz-3qk6~6dp3" _uuid="00000000-0000-0000-B1B9-9BDE5C8E734E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ernz-3qk6~6dp3"><intent_id>922592</intent_id><project_id>857568</project_id><text_data>Installed 7-ea. emergency alert buttons to replace Inovonics System.</text_data><comment_date>2018-08-01T00:00:00</comment_date></row><row _id="row-5my3_s4a8_xk7w" _uuid="00000000-0000-0000-E895-65F43F52D70A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5my3_s4a8_xk7w"><intent_id>557024</intent_id><project_id>702940</project_id><text_data>Provide and install 38 category 6 voice and data cables, terminate, test and label.</text_data><comment_date>2013-02-20T00:00:00</comment_date></row><row _id="row-prcp-tsrb~5v9g" _uuid="00000000-0000-0000-8B10-9718B955CC5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prcp-tsrb~5v9g"><intent_id>1083341</intent_id><project_id>897882</project_id><text_data>We employ field staff from United Union of Roofers, Waterproofers, and Allied Workers from Local 54 out of Seattle and Local 153 out of Tacoma.  the higher rate represents wages from Local 153.</text_data><comment_date>2020-08-26T00:00:00</comment_date></row><row _id="row-2fsh-bh4d_7esn" _uuid="00000000-0000-0000-39CB-F7A99ACF928F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2fsh-bh4d_7esn"><intent_id>1109593</intent_id><project_id>813591</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2020-12-21T00:00:00</comment_date></row><row _id="row-vicb_g22p.n4gd" _uuid="00000000-0000-0000-3168-B1F9F23AC7CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vicb_g22p.n4gd"><intent_id>505991</intent_id><project_id>685174</project_id><text_data>manual planting using shovels.  No equipment or power equipment used.</text_data><comment_date>2012-03-30T00:00:00</comment_date></row><row _id="row-qwk5-tipa_k2wx" _uuid="00000000-0000-0000-59F5-F446BDF9E682" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qwk5-tipa_k2wx"><intent_id>730130</intent_id><project_id>766375</project_id><text_data>150161</text_data><comment_date>2015-11-05T00:00:00</comment_date></row><row _id="row-i78y.n6pu.bzxk" _uuid="00000000-0000-0000-0561-FC59902DF50F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i78y.n6pu.bzxk"><intent_id>1097788</intent_id><project_id>937178</project_id><text_data>Low Voltage voice and data cabling</text_data><comment_date>2020-11-05T00:00:00</comment_date></row><row _id="row-28w3~3z5t.rmtb" _uuid="00000000-0000-0000-6E57-F5232F9DEDD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-28w3~3z5t.rmtb"><intent_id>962467</intent_id><project_id>874260</project_id><text_data>1. Electric Furnace Repair2. Single Family Dwelling3. 14. a, b NO4. c YES4. d, e, f, g, h, i, j  NO5. YES6. YES7. NO8. YES</text_data><comment_date>2019-02-27T00:00:00</comment_date></row><row _id="row-4tpm.dhuk.tsvb" _uuid="00000000-0000-0000-3299-17511DE1C2D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4tpm.dhuk.tsvb"><intent_id>639569</intent_id><project_id>736574</project_id><text_data>Fringe Breakdown:$14.75---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $7.75 Pension$15.38---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $8.38 Pension</text_data><comment_date>2014-07-08T00:00:00</comment_date></row><row _id="row-qt74-5eyf~ig2j" _uuid="00000000-0000-0000-9D3D-BABFC3857109" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qt74-5eyf~ig2j"><intent_id>535649</intent_id><project_id>696373</project_id><text_data>042230</text_data><comment_date>2012-09-20T00:00:00</comment_date></row><row _id="row-euui.ixj3.ti66" _uuid="00000000-0000-0000-FFED-5F79135A3684" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-euui.ixj3.ti66"><intent_id>1266802</intent_id><project_id>1031145</project_id><text_data>We are an Idaho based business for industrial insurance.</text_data><comment_date>2022-09-15T00:00:00</comment_date></row><row _id="row-xzcr~kawb.mnmh" _uuid="00000000-0000-0000-64D2-8A9340A96B7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xzcr~kawb.mnmh"><intent_id>552582</intent_id><project_id>697285</project_id><text_data>Penhall Job # 230762Truck driver is oil dispersment vehicle.</text_data><comment_date>2013-01-18T00:00:00</comment_date></row><row _id="row-7z6n~2i92_vkmt" _uuid="00000000-0000-0000-0934-7C53200D38E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7z6n~2i92_vkmt"><intent_id>791152</intent_id><project_id>791346</project_id><text_data>Duties for job include sweeping, dusting , vacuuming, wiping down surfaces.</text_data><comment_date>2016-09-22T00:00:00</comment_date></row><row _id="row-uk3u~uaas~46a8" _uuid="00000000-0000-0000-CE42-65F26EEC0C12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uk3u~uaas~46a8"><intent_id>1194705</intent_id><project_id>986677</project_id><text_data>test and repair existing irrigation, import soil and mulch, plant (4) trees, install sod lawn</text_data><comment_date>2021-11-22T00:00:00</comment_date></row><row _id="row-47rs.fg8n-7x4t" _uuid="00000000-0000-0000-C34B-B2D5906D0F22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-47rs.fg8n-7x4t"><intent_id>334295</intent_id><project_id>658882</project_id><text_data>Industrial Insurance Account Id: 254,625-00Other Trucks Specs: 4800GVW/3500 Gal Vacuum Pump Truck.</text_data><comment_date>2011-03-28T00:00:00</comment_date></row><row _id="row-b9fp_q4bb-bfi6" _uuid="00000000-0000-0000-4183-7806B27875B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9fp_q4bb-bfi6"><intent_id>997090</intent_id><project_id>889239</project_id><text_data>SR# 44504376</text_data><comment_date>2019-08-05T00:00:00</comment_date></row><row _id="row-byhv_8p9y.97pt" _uuid="00000000-0000-0000-B7A8-2223FBC493C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-byhv_8p9y.97pt"><intent_id>895470</intent_id><project_id>846984</project_id><text_data>landscaping mowing trim edging, irrigation</text_data><comment_date>2018-03-28T00:00:00</comment_date></row><row _id="row-8bj9_t6br.shsj" _uuid="00000000-0000-0000-C337-E5EF2C6F3ECD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8bj9_t6br.shsj"><intent_id>805208</intent_id><project_id>801980</project_id><text_data>We pay 100% Employee Health Care for Fringe</text_data><comment_date>2016-12-01T00:00:00</comment_date></row><row _id="row-pw6r.2w7z_s6zm" _uuid="00000000-0000-0000-F1E0-9603D006717D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pw6r.2w7z_s6zm"><intent_id>504716</intent_id><project_id>684590</project_id><text_data>#1 - Is the structure a single family dwelling, duplex, apartment, condominium or other residential structure? Apartment#2 - Including any basement or garage, how many stories or levels does the structure have? 3#3 - What is the facility used for? --Answer �yes� or �no� to each of the following options: (a) Permanent residence only? yes(b) Rehabilitation house? no (c) Transitional housing? no (d) Communal dining facility? no(e) Treatment services? no (f) Counseling? no (g) Other? no#4 - Does each dwelling unit have its own self-contained kitchen? yes#5 - Does each dwelling unit have its own bathroom? yes#6 - Is there a community facility or manager�s office on site? yes#7 - Is any part of the facility used by members of the public? no</text_data><comment_date>2012-03-21T00:00:00</comment_date></row><row _id="row-zuur_8rjm_y4iq" _uuid="00000000-0000-0000-8DF2-D6BC5D7776E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zuur_8rjm_y4iq"><intent_id>543413</intent_id><project_id>699258</project_id><text_data>Operators Fringe - $15.90/hr; Health &amp; Security - $7.55/hr, Pension - $7.65/hr, Apprenticeship - $.70/hrIronworkers Fringe - $20.88/hr; Health &amp; Security - $6.77/hr, Pension - $9.20/hr, Apprenticeship - $.63/hr, Annuity - $4.00/hr, IMPACT Program - $.28/hr</text_data><comment_date>2012-12-13T00:00:00</comment_date></row><row _id="row-swd4~tb4y-ib5u" _uuid="00000000-0000-0000-71AC-F531609C367C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-swd4~tb4y-ib5u"><intent_id>817893</intent_id><project_id>814320</project_id><text_data>State of WA � Dept. of L&amp;I � Prevailing Wage DivisionExemption Intent Questionnaire form � VMC MAC 260 ANTI COAGPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1. What is the specific purpose of this awarding agency�s public works project? Remodel existing building2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for the public works project? No3.Does this project entail the remodeling or new construction of a facility? Yes, but not performed by Siemens Employees.4. If your firm is working upon a type of building system, what type of system is involved? Fire alarm system5. What specific tasks did your employees perform? Siemens� FIS Technicians, perform their work strictly on laptop computers, both remotely and on-site during the commissioning process. While off-site, the FIS Technicians update program configurations and point inputs. The FIS Technician typically sits in at control panel and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the system is operating properly, the FIS Technician trains the end-user about system functionality, again using a computer interface. Importantly, FIS Technicians do not use trade tools, such as drills or wrenches.6. What, if any, tools did your employees use in the performance of those tasks? Laptop computer.7. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No-none.8. Are you going to be hiring any subcontractors for this project? Yes. To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification�, �commissioning� or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2017-02-27T00:00:00</comment_date></row><row _id="row-kcxy~ng5j~wy9a" _uuid="00000000-0000-0000-541E-7CE8094F837E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kcxy~ng5j~wy9a"><intent_id>1454789</intent_id><project_id>1121847</project_id><text_data>This project was all performed in 2023, at the time our industrial insurance was active. This company's information is changing, it will be the last filing for this company listing. Due to this, the LNI contact did not recommend opening the workers compensation.</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-jv96-zapq_yizr" _uuid="00000000-0000-0000-90FF-AB962231A840" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jv96-zapq_yizr"><intent_id>1469614</intent_id><project_id>1099757</project_id><text_data>Harbor Pacific Hired us</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-i3xh~j7bj.rnme" _uuid="00000000-0000-0000-F833-632B30C4E325" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i3xh~j7bj.rnme"><intent_id>1010217</intent_id><project_id>894462</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2019-10-04T00:00:00</comment_date></row><row _id="row-si9i~8v5e-x2ff" _uuid="00000000-0000-0000-54FB-DA373D325418" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-si9i~8v5e-x2ff"><intent_id>565442</intent_id><project_id>706076</project_id><text_data>Job # 3178 related to Job # C11117</text_data><comment_date>2013-04-19T00:00:00</comment_date></row><row _id="row-gv6p-aw9n~ha8d" _uuid="00000000-0000-0000-8DCC-569DD503936A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gv6p-aw9n~ha8d"><intent_id>1099561</intent_id><project_id>938054</project_id><text_data>1) This is a water damage repair job at an apartment complex2) Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?3) 2 story building4) What is the building used for? --Answer �yes� or �no� to each of the following options:         a) Any commercial use in the structure?    b) Any retail use in the structure?    c) Permanent residence only?    d) Rehabilitation house?    e) Transitional housing?    f) Communal dining facility?    g) Treatment services?     h) Assisted living services?    I) Dormitories?    J) Counseling?    K) Is each room and/or bed in the structure rented separately?     L) other?5) Does each dwelling unit have its own self contained kitchen? 6) Does each dwelling unit have its own bathroom7) Is there a community facility or manager's office on site?8) Is any part of the structure used by members of the public?</text_data><comment_date>2020-10-28T00:00:00</comment_date></row><row _id="row-tvtw.qbj7-4cu9" _uuid="00000000-0000-0000-DDA0-B17EAB7EFEE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tvtw.qbj7-4cu9"><intent_id>923831</intent_id><project_id>858038</project_id><text_data>Installation of A/V Projector System</text_data><comment_date>2018-08-07T00:00:00</comment_date></row><row _id="row-466g-d5ph-w9tr" _uuid="00000000-0000-0000-88F1-7597D39AB6E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-466g-d5ph-w9tr"><intent_id>1117067</intent_id><project_id>945667</project_id><text_data>Russell Landscaping will use a Ditch Witch machine when installing sprinkler system trenching no more than 12'. Plant material will be installed per specification using shovels, rakes and wheelbarrows. Top soil and wood bark mulch will be installed using a bobcat skidsteer, wheelbarrows, shovels and rakes. Rock will be installed using wheelbarrows, shovels and rakes.</text_data><comment_date>2021-01-22T00:00:00</comment_date></row><row _id="row-v6hu-qdm6-smic" _uuid="00000000-0000-0000-2DDF-A85029BDAA97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v6hu-qdm6-smic"><intent_id>1242101</intent_id><project_id>1018097</project_id><text_data>Correct contract amount is $11,612.25.  Per request from Danica at Johnson Irrigation.</text_data><comment_date>2022-12-08T00:00:00</comment_date></row><row _id="row-uf6n_wm4c-ef6e" _uuid="00000000-0000-0000-C002-7ED507976872" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uf6n_wm4c-ef6e"><intent_id>556667</intent_id><project_id>705141</project_id><text_data>Landscape project details:  workers will be Lawn mowing and plant trimming</text_data><comment_date>2013-03-01T00:00:00</comment_date></row><row _id="row-25et~p5dw.7ucz" _uuid="00000000-0000-0000-6562-CB54773C3326" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-25et~p5dw.7ucz"><intent_id>1008493</intent_id><project_id>893795</project_id><text_data>WO # 9534611</text_data><comment_date>2019-09-19T00:00:00</comment_date></row><row _id="row-tvxv-6bqr_z5gz" _uuid="00000000-0000-0000-92A7-E2777DAEAAB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tvxv-6bqr_z5gz"><intent_id>990082</intent_id><project_id>886531</project_id><text_data>City of Bellingham PO BK62843, Guardian Security Invoices 861496, 867847</text_data><comment_date>2019-07-08T00:00:00</comment_date></row><row _id="row-ue92~j9bj-d68w" _uuid="00000000-0000-0000-7276-B670D9CC1509" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ue92~j9bj-d68w"><intent_id>757464</intent_id><project_id>789943</project_id><text_data>Job # 8012351</text_data><comment_date>2016-04-19T00:00:00</comment_date></row><row _id="row-eg8i_ien3~72zh" _uuid="00000000-0000-0000-1561-CC91D9593845" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eg8i_ien3~72zh"><intent_id>566344</intent_id><project_id>709630</project_id><text_data>Project involved labor and materials to track belts and replace cleaners.</text_data><comment_date>2013-04-24T00:00:00</comment_date></row><row _id="row-tuw4.9ngr_q2bi" _uuid="00000000-0000-0000-A18F-ACF4C357E18E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tuw4.9ngr_q2bi"><intent_id>643038</intent_id><project_id>732756</project_id><text_data>Owner may perform work as a Carpenter on this project.</text_data><comment_date>2014-07-23T00:00:00</comment_date></row><row _id="row-9jfv_r38t.m5mw" _uuid="00000000-0000-0000-5351-CBBB2AA9DF39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9jfv_r38t.m5mw"><intent_id>977191</intent_id><project_id>880844</project_id><text_data>09-19-026N</text_data><comment_date>2019-05-10T00:00:00</comment_date></row><row _id="row-apdz_37kc-2qgi" _uuid="00000000-0000-0000-21DC-F5485D4B6693" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-apdz_37kc-2qgi"><intent_id>745982</intent_id><project_id>770804</project_id><text_data>Two employees drove from Tukwila to Kent in a delivery truck to install a white board to a classroom wall.</text_data><comment_date>2016-02-10T00:00:00</comment_date></row><row _id="row-y63f_ka8k.kjnk" _uuid="00000000-0000-0000-59E0-126EDDD22369" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y63f_ka8k.kjnk"><intent_id>864624</intent_id><project_id>822910</project_id><text_data>LAS, INC. PROVIDES EMPLOYEES FOR ANDERSON ROCK</text_data><comment_date>2017-09-22T00:00:00</comment_date></row><row _id="row-ei2f~mvuc_zsk8" _uuid="00000000-0000-0000-7691-104BE5410AA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ei2f~mvuc_zsk8"><intent_id>606935</intent_id><project_id>703530</project_id><text_data>ST#13-008W</text_data><comment_date>2013-12-03T00:00:00</comment_date></row><row _id="row-n7qa-bmsa_5t69" _uuid="00000000-0000-0000-8F50-F8DCAAA2E132" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n7qa-bmsa_5t69"><intent_id>784968</intent_id><project_id>788242</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2016-08-24T00:00:00</comment_date></row><row _id="row-m7vc.j6vd.fswc" _uuid="00000000-0000-0000-A111-9DF6C0FC862F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7vc.j6vd.fswc"><intent_id>1065573</intent_id><project_id>922509</project_id><text_data>We will be installing compost or bark mulch as a topdressing to finish off the landscaped beds and our work falls under the landscape beautification category. Our laborers are responsible for backpack blower cleanup and will be paid according to the rates published for landscaping and planting laborer. The operator of the blower truck will be paid according to the oil distribution / mulch distribution power equipment operator category. Please approve this intent as filed. Thank you for your assistance.</text_data><comment_date>2020-06-16T00:00:00</comment_date></row><row _id="row-vfqr~6gqu-h38k" _uuid="00000000-0000-0000-A285-9F38603AB887" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfqr~6gqu-h38k"><intent_id>1014066</intent_id><project_id>895605</project_id><text_data>5050.190497</text_data><comment_date>2019-10-09T00:00:00</comment_date></row><row _id="row-rsqc-mdfq.aid4" _uuid="00000000-0000-0000-6A58-16117807B721" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rsqc-mdfq.aid4"><intent_id>605705</intent_id><project_id>724412</project_id><text_data>French drain installed in garden beds.</text_data><comment_date>2013-12-12T00:00:00</comment_date></row><row _id="row-7y49_s2ff_gs4z" _uuid="00000000-0000-0000-83B1-55C77229834F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7y49_s2ff_gs4z"><intent_id>1182613</intent_id><project_id>978602</project_id><text_data>other truck is s flatbed non cdl under 26K GVW to haul seeder</text_data><comment_date>2021-10-03T00:00:00</comment_date></row><row _id="row-ab9x.b45q.s3n3" _uuid="00000000-0000-0000-9F8C-14AFDAD16E07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ab9x.b45q.s3n3"><intent_id>821021</intent_id><project_id>815172</project_id><text_data>MMFS Job#73176230</text_data><comment_date>2017-03-15T00:00:00</comment_date></row><row _id="row-exrh_9mg8_2ydk" _uuid="00000000-0000-0000-FA99-C59916873672" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-exrh_9mg8_2ydk"><intent_id>524975</intent_id><project_id>688219</project_id><text_data>Oregon Workers Compensation Policy:  Saif Corp #625739</text_data><comment_date>2012-07-27T00:00:00</comment_date></row><row _id="row-nfy7~8nwg~sqxa" _uuid="00000000-0000-0000-A17B-99DEFACBD2A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nfy7~8nwg~sqxa"><intent_id>1147048</intent_id><project_id>963615</project_id><text_data>JMI PROJECT #P11982</text_data><comment_date>2021-05-24T00:00:00</comment_date></row><row _id="row-wywn-af9t_i67n" _uuid="00000000-0000-0000-C8AD-3388A2CBA857" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wywn-af9t_i67n"><intent_id>1024896</intent_id><project_id>901039</project_id><text_data>Haz Waste workers to clean coils using rags/sponges</text_data><comment_date>2019-12-04T00:00:00</comment_date></row><row _id="row-sgcv-vkv2_ijgc" _uuid="00000000-0000-0000-CA89-78B6270F1F82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sgcv-vkv2_ijgc"><intent_id>589990</intent_id><project_id>713198</project_id><text_data>Filed by Taras Burich</text_data><comment_date>2013-08-26T00:00:00</comment_date></row><row _id="row-xc8u-xcf2.nqkv" _uuid="00000000-0000-0000-39C8-DAEA7C4BD675" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xc8u-xcf2.nqkv"><intent_id>570565</intent_id><project_id>661082</project_id><text_data>Form filed by: Toni Rosaia</text_data><comment_date>2013-05-20T00:00:00</comment_date></row><row _id="row-9dum.pv7v-64x6" _uuid="00000000-0000-0000-1512-FDAD9CE1112E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9dum.pv7v-64x6"><intent_id>1006066</intent_id><project_id>892808</project_id><text_data>1. Clean and Tune furnace. 2. Single family dwelling. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2019-09-10T00:00:00</comment_date></row><row _id="row-gzqw-ki4v_hean" _uuid="00000000-0000-0000-F8D2-0A993A976DE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzqw-ki4v_hean"><intent_id>1005891</intent_id><project_id>892734</project_id><text_data>PROVIDE LABOR TO REMOVE OLD PHONE LINES FROM FLOOR MONUMENT NEAR COLUMN #3-37 HALLWAY FMD 3RD FLOOR WEST.</text_data><comment_date>2019-09-10T00:00:00</comment_date></row><row _id="row-4ipf.rp4i~afiu" _uuid="00000000-0000-0000-4CF2-7EDE977A51BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ipf.rp4i~afiu"><intent_id>646974</intent_id><project_id>741483</project_id><text_data>Erecting 40x80' Concrete slab and erecting a metal building and associated water, sewer, storm, electrical.</text_data><comment_date>2014-08-11T00:00:00</comment_date></row><row _id="row-74as-b7ma~j8pu" _uuid="00000000-0000-0000-B472-ABEC88BC4C41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74as-b7ma~j8pu"><intent_id>1131064</intent_id><project_id>950059</project_id><text_data>ELECTRICALSINGLE FAMILY HOUSINGUNKNOWNA - NOB. - NOC. - YESD. - NO	E.- NOF. - NOG. - NOH. - NOI. - NOJ. - NOK - NO5 YES6 YES7 UNKNOWN8 NO</text_data><comment_date>2021-03-24T00:00:00</comment_date></row><row _id="row-x48t_u562-7hq5" _uuid="00000000-0000-0000-EFB5-5ECB8C5E3AE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x48t_u562-7hq5"><intent_id>1079893</intent_id><project_id>928931</project_id><text_data>9850538</text_data><comment_date>2020-08-12T00:00:00</comment_date></row><row _id="row-8mgg-4cy2_6isv" _uuid="00000000-0000-0000-87F5-7BB03496B54B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8mgg-4cy2_6isv"><intent_id>484383</intent_id><project_id>676505</project_id><text_data>Journeyman Fringe = $2.70 Medical, $.46 Holiday, $1.22 Vacation, $14.86 401K</text_data><comment_date>2011-10-18T00:00:00</comment_date></row><row _id="row-j4x7_arrn~ky8a" _uuid="00000000-0000-0000-ECBA-9E97D64A53AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j4x7_arrn~ky8a"><intent_id>698053</intent_id><project_id>742066</project_id><text_data>**We do not have an industrial insurance account in Washington since we are there on a temporary basis. We have Oregon Workers Comp insurance (Saif Policy#439059) and stop gap liability.</text_data><comment_date>2015-06-03T00:00:00</comment_date></row><row _id="row-u4dn.p69i-mbdp" _uuid="00000000-0000-0000-3E56-FADB849C8606" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u4dn.p69i-mbdp"><intent_id>656652</intent_id><project_id>745177</project_id><text_data>Job # 166850</text_data><comment_date>2014-09-24T00:00:00</comment_date></row><row _id="row-y26s~ub7y-bcgs" _uuid="00000000-0000-0000-B7F6-8721771B22E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y26s~ub7y-bcgs"><intent_id>809873</intent_id><project_id>810615</project_id><text_data>1. install bath fan 2. apartment 3. 1 level 4a. no b. no c. yes d. no e. no f. no g. no h. no i. no j. no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2017-01-05T00:00:00</comment_date></row><row _id="row-zxsf~iddf.3fnb" _uuid="00000000-0000-0000-CEED-22E83CBEB8D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxsf~iddf.3fnb"><intent_id>1096084</intent_id><project_id>708188</project_id><text_data>ETS-Lindgren Inc. is filing On Behalf Of HIghlands Welding Repair, Inc. due to CEASED OPERATIONS3612 NE 4th Street #26. Renton, WA 98056</text_data><comment_date>2020-10-15T00:00:00</comment_date></row><row _id="row-wgef-ab26~u73u" _uuid="00000000-0000-0000-5D3F-A6A209AD59F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wgef-ab26~u73u"><intent_id>998428</intent_id><project_id>887824</project_id><text_data>Cut and cap existing irrigation, install sleeving and supply and instal boulders.  Will use a skid steer and misc. hand tools</text_data><comment_date>2019-08-09T00:00:00</comment_date></row><row _id="row-7idw.nu8e~6w9r" _uuid="00000000-0000-0000-A113-33DAC59253D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7idw.nu8e~6w9r"><intent_id>1149545</intent_id><project_id>965005</project_id><text_data>Installation of new phone system, programming, customer training in Sumner, WA at the Powerhouse indoors.</text_data><comment_date>2021-06-03T00:00:00</comment_date></row><row _id="row-ykiv.pnh5.e34g" _uuid="00000000-0000-0000-FA91-BF5E72DADFA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ykiv.pnh5.e34g"><intent_id>655133</intent_id><project_id>744214</project_id><text_data>054079</text_data><comment_date>2014-09-17T00:00:00</comment_date></row><row _id="row-q8dg~u2e8~8sfi" _uuid="00000000-0000-0000-C142-7DCFCB097E0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8dg~u2e8~8sfi"><intent_id>764914</intent_id><project_id>786809</project_id><text_data>Filed by Joyce Statton</text_data><comment_date>2016-05-27T00:00:00</comment_date></row><row _id="row-6jxb_v6f4_ufwm" _uuid="00000000-0000-0000-603C-D323385DB0C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6jxb_v6f4_ufwm"><intent_id>482807</intent_id><project_id>676051</project_id><text_data>Phalaris arundinacea (Reed canarygrass) will be cut down to ground level, where possible, utilizing gas-powered brush cutters.  Reed canarygrass will be cut to water level where there is standing water.  All cut RCG material will remain on site after cutting with no materials removed.</text_data><comment_date>2011-10-10T00:00:00</comment_date></row><row _id="row-5c24_m2tn_6x6v" _uuid="00000000-0000-0000-AF80-C0279275F6F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5c24_m2tn_6x6v"><intent_id>750218</intent_id><project_id>786714</project_id><text_data>Job # 105115-001</text_data><comment_date>2016-03-07T00:00:00</comment_date></row><row _id="row-jg2u_n3b3~ktfb" _uuid="00000000-0000-0000-4ED2-AB2B888609D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jg2u_n3b3~ktfb"><intent_id>580557</intent_id><project_id>472821</project_id><text_data>Journey Level (Tunnel) - Fringe $17.93		NEBF	 $1.41 	Medical	 $7.45 	Pension	 $6.18 	Annuity	 $1.75 	JATC	 $0.58 	AMF	 $0.35 	LMCC &amp; NLMCC	 $0.11 	SAP	 $0.10 			Journey Level - Fringe $17.77		NEBF	 $1.28 	Medical	 $7.45 	Pension	 $6.18 	Annuity	 $1.75 	JATC	 $0.58 	AMF	 $0.32 	LMCC &amp; NLMCC	 $0.11 	SAP	 $0.10</text_data><comment_date>2013-07-16T00:00:00</comment_date></row><row _id="row-x559~uu7d-4zzy" _uuid="00000000-0000-0000-D9F5-77EA14AE83B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x559~uu7d-4zzy"><intent_id>591667</intent_id><project_id>325127</project_id><text_data>Prevailing wage issues are very fact specific. In order for us to evaluate if the work to be performed by Electrical Testing is not covered for the Valley Medical Center project, we need to know more about the project and the tasks your employees perform in conjunction with this project. Please provide us with the following information:1.)  What is the purpose of this project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc.To construct a new Emergency Services Tower building. 2.)  Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)] Not by Electrical Reliability Services.3.)  Does this project entail the remodeling or new construction of a facility? This project is new construction. 4.)  If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.The system our employees worked on was the incoming 15KV electrical power distribution system.5.)  What specific tasks will your employees perform? Our job scope was to perform acceptance testing of the new medium voltage electrical distribution equipment feeding into the building. This included medium voltage air switches, medium voltage cables, and transformers. Acceptance testing of electrical equipment is performed when most of the construction phase has been completed. The electrical contractor on site provided access to the equipment by pulling panel covers and isolating equipment as was necessary for testing. ERS field engineers performed inspections and tests to verify proper operation of the components as specified by the project engineer. This involved the use of many different types of test equipment requiring a significant amount of training and knowledge to operate properly. The electrical contractor performed all tasks as are typically required by union by-laws such as routine meggering, torquing/tightening of all bolted connections, all cleaning tasks, wiring continuity, phase rotation tests, providing temporary test power for test equipment, etc. Project specifications typically require independent, 3rd party testing companies to perform specific testing.  6.)  Will your employees work require the physical modification to the electrical system wiring including connection and disconnection, temporary or permanent?No modifications are made to the equipment under test.7.)  Will your employees require the use of a screwdriver, wrench, or any other handheld tool besides a multimeter?Small tools, such as screwdrivers or perhaps adjustable wrenches are used on our own test equipment, when necessary. Of any tool work is required on the equipment under test, electricians are used for such work. 8)  If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?Our employees move their test equipment into close proximity of the equipment to be tested. No power equipment is required for this movement.9)  Will your employees perform any work that requires an electrical license or certification under Chapter 296-46B WAC?No.10)  Are you going to be hiring any subcontractors for this project?No.</text_data><comment_date>2013-09-04T00:00:00</comment_date></row><row _id="row-3wp2.rqut.3zfe" _uuid="00000000-0000-0000-C389-C368E2535923" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3wp2.rqut.3zfe"><intent_id>911808</intent_id><project_id>853629</project_id><text_data>Employees drive either a 2500 or a 3500 Chevy Silverado to and from the job site. Methane Pump Station/This work was annual preventative maintenance, change oil, oil filter, fuel filter, preform battery test, 27 point inspection and transfer test./Preformed load bank, a resistive test for 2 hours progressing to 80% of generator capacity. Admin Building/This work was annual preventative maintenance, change oil, oil filter, fuel filter, preform battery test, 27 point inspection and transfer test./Preformed load bank, a resistive test for 2 hours progressing to 80% of generator capacity. 400kw Generac/This work was annual preventative maintenance, change oil, oil filter, fuel filter, preform battery test, 27 point inspection and transfer test./Preformed load bank, a resistive test for 2 hours progressing to 80% of generator capacity.</text_data><comment_date>2018-06-16T00:00:00</comment_date></row><row _id="row-ms7r~xpbs~r9ub" _uuid="00000000-0000-0000-0F9D-C90F13269B21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ms7r~xpbs~r9ub"><intent_id>767999</intent_id><project_id>794316</project_id><text_data>Job contact liason: Cesar J de Leon</text_data><comment_date>2016-06-13T00:00:00</comment_date></row><row _id="row-mqqf.zzqy.wbwv" _uuid="00000000-0000-0000-E3F3-5366B19862BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mqqf.zzqy.wbwv"><intent_id>592375</intent_id><project_id>719475</project_id><text_data>We bid this project based off of 2012 DOE work that was approved as landscape, why not this year?We have added regular POE and Laborers, but would like to be advised if this work, being it is residential yards, can be applicable to Residential Laborer?</text_data><comment_date>2013-09-17T00:00:00</comment_date></row><row _id="row-ny2q_dcry.ziqz" _uuid="00000000-0000-0000-B072-072F5FEDD3E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ny2q_dcry.ziqz"><intent_id>876226</intent_id><project_id>828792</project_id><text_data>Blythe Job #U-112</text_data><comment_date>2017-11-22T00:00:00</comment_date></row><row _id="row-bijg.yxq7~y46t" _uuid="00000000-0000-0000-22AA-42D68FC655B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bijg.yxq7~y46t"><intent_id>638290</intent_id><project_id>738301</project_id><text_data>OTHER TRUCK = Water Truck Tank (0-8000 gallons)</text_data><comment_date>2014-06-30T00:00:00</comment_date></row><row _id="row-8yp7~tcf6-ta5t" _uuid="00000000-0000-0000-BB0C-0F792583D029" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yp7~tcf6-ta5t"><intent_id>1287909</intent_id><project_id>1043502</project_id><text_data>9896685</text_data><comment_date>2022-12-06T00:00:00</comment_date></row><row _id="row-2udd~nngv_psxc" _uuid="00000000-0000-0000-DFA2-3DF159B9C8CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2udd~nngv_psxc"><intent_id>783768</intent_id><project_id>799287</project_id><text_data>One employee will be driving truck w/ hydroseeder. One employee will be using hydroseeding equipment</text_data><comment_date>2016-08-19T00:00:00</comment_date></row><row _id="row-dc5a_mues_3myu" _uuid="00000000-0000-0000-CFE7-C83EF1A7F31D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dc5a_mues_3myu"><intent_id>1063505</intent_id><project_id>914491</project_id><text_data>We are a subcontractor for N.A. Degerstrom Inc. They have been hired to improve the athletic surfaces at 2 schools in the Central Valley School District. We are repairing the Pole Vault Runway and High Jump Edge surface at Central Valley High School by putting down a rubber and epoxy mix to fill holes. Once we make sure the surface is safe, we will spray paint lines on the track for track events. We are also repairing the D-Zone track surface by putting down a rubber and epoxy mix and striping as needed at University High School.  Our crew uses tools like shovels, rakes, brooks and wheelbarrows to move the rubber. We also use scissors and tape for masking areas to keep the other surfaces clean.</text_data><comment_date>2020-06-08T00:00:00</comment_date></row><row _id="row-h3p4~m9nn-pbis" _uuid="00000000-0000-0000-015E-71D5EFA93640" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h3p4~m9nn-pbis"><intent_id>819505</intent_id><project_id>804875</project_id><text_data>Install irrigation and landscaping at Crescent Bar recreation area</text_data><comment_date>2017-03-07T00:00:00</comment_date></row><row _id="row-wssc_vbgu-mjyz" _uuid="00000000-0000-0000-1762-39A3BDB9BE66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wssc_vbgu-mjyz"><intent_id>1068479</intent_id><project_id>920697</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and 2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2020-06-29T00:00:00</comment_date></row><row _id="row-mmsg_8fpp.i2pw" _uuid="00000000-0000-0000-6F36-4202FE2E251B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mmsg_8fpp.i2pw"><intent_id>657895</intent_id><project_id>736695</project_id><text_data>A) The project consisted of reworking the Mercer Island Parking lot. Including but not limited to new asphalt, curbs, irrigation and establishing planting beds with compost &amp; mulch and planting. B) The part we performed consisted of planting trees, shrubs and groundcover with shovels. We did NOT add compost or mulch. That work was performed by someone else.</text_data><comment_date>2014-10-20T00:00:00</comment_date></row><row _id="row-dfwk-2mx6~e8yx" _uuid="00000000-0000-0000-9FB3-6609CA4FF413" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfwk-2mx6~e8yx"><intent_id>1072882</intent_id><project_id>896659</project_id><comment_date>2020-07-16T00:00:00</comment_date></row><row _id="row-bci5~asrr-rnbh" _uuid="00000000-0000-0000-C93D-D5288509F961" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bci5~asrr-rnbh"><intent_id>1196440</intent_id><project_id>987974</project_id><text_data>We are an Idaho based business for Industrial Insurance.</text_data><comment_date>2021-12-01T00:00:00</comment_date></row><row _id="row-e65t.mz46~uuzu" _uuid="00000000-0000-0000-11B6-EAB9A83D2F94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e65t.mz46~uuzu"><intent_id>1286162</intent_id><project_id>1042447</project_id><text_data>Truck Driver other - delivery of finished countertops from shop to jobsite.  Driver is installer, vehicle is Ford Transit van</text_data><comment_date>2022-11-28T00:00:00</comment_date></row><row _id="row-stdm~pb7x_3gcz" _uuid="00000000-0000-0000-0803-FFE239076DA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-stdm~pb7x_3gcz"><intent_id>1172342</intent_id><project_id>976652</project_id><text_data>ICI Job # 1323</text_data><comment_date>2021-08-25T00:00:00</comment_date></row><row _id="row-qkt2_6faa~gegx" _uuid="00000000-0000-0000-DD3C-5DDE1ED3897B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qkt2_6faa~gegx"><intent_id>614853</intent_id><project_id>724146</project_id><text_data>This intent is for BP#308H.</text_data><comment_date>2014-02-04T00:00:00</comment_date></row><row _id="row-344y-vw49~nskb" _uuid="00000000-0000-0000-978C-7A23D71F14CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-344y-vw49~nskb"><intent_id>1170229</intent_id><project_id>975609</project_id><comment_date>2021-08-18T00:00:00</comment_date></row><row _id="row-mwec-72pp~9p24" _uuid="00000000-0000-0000-7BB6-0E7D40DF7BBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mwec-72pp~9p24"><intent_id>1031915</intent_id><project_id>900326</project_id><text_data>Other trucks include 4000 gal water truck for dust control</text_data><comment_date>2020-01-15T00:00:00</comment_date></row><row _id="row-9g29~6vn8~7587" _uuid="00000000-0000-0000-036A-F797FD89CA67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9g29~6vn8~7587"><intent_id>599783</intent_id><project_id>696254</project_id><text_data>We will be beautifying the area after the contractor is done. We will be installing 2&amp;quot; of Topsoil, bark, gravel &amp; sod.  We will be using rakes, shovels, etc. We will be seeding &amp; using a hydroseeder.</text_data><comment_date>2013-10-16T00:00:00</comment_date></row><row _id="row-xh8f.zb7n~67cs" _uuid="00000000-0000-0000-D8B7-806D97495699" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xh8f.zb7n~67cs"><intent_id>994258</intent_id><project_id>866098</project_id><text_data>A) Bridge replacementB)Maintenance of landscaped areas through removal or weeds.hand toolsPer signed agreement with Laborers Local 242, Wages have been set for this contract only for Landscape Maintenance at $17.87 plus $2.60 fringe benefits.  A hard copy of this signed agreement is being sent via mail to Prevailing Wage office.  Team of 2 is schedule to provide this maintenance.</text_data><comment_date>2019-07-24T00:00:00</comment_date></row><row _id="row-uzqs.z8ij-6ymh" _uuid="00000000-0000-0000-28FC-FBEAEE4504A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzqs.z8ij-6ymh"><intent_id>786284</intent_id><project_id>801280</project_id><text_data>Filed by Clayton Jones</text_data><comment_date>2016-08-31T00:00:00</comment_date></row><row _id="row-fvnh_9zhm-2xw2" _uuid="00000000-0000-0000-C77A-52B403A895D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fvnh_9zhm-2xw2"><intent_id>1185521</intent_id><project_id>983699</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a thru 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2021-10-14T00:00:00</comment_date></row><row _id="row-wrqj~hixu_iz6z" _uuid="00000000-0000-0000-F7B9-7286A3EBA134" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wrqj~hixu_iz6z"><intent_id>334095</intent_id><project_id>658473</project_id><text_data>Not offering fringe benefits &amp; corrected occupation classification. Called L&amp;I customer service on 06/16/2011</text_data><comment_date>2011-06-16T00:00:00</comment_date></row><row _id="row-nwsu_hdtp-xe5c" _uuid="00000000-0000-0000-3F68-BBFD36165B8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nwsu_hdtp-xe5c"><intent_id>794508</intent_id><project_id>783940</project_id><text_data>Filed by Mike Starbard</text_data><comment_date>2016-10-06T00:00:00</comment_date></row><row _id="row-i8fk.tknj-8dh7" _uuid="00000000-0000-0000-7970-9B8BC6EE35BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i8fk.tknj-8dh7"><intent_id>793986</intent_id><project_id>804226</project_id><text_data>Backflow repair</text_data><comment_date>2016-10-05T00:00:00</comment_date></row><row _id="row-63xn_fub5-y8es" _uuid="00000000-0000-0000-29B9-CC18B4DA7F88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-63xn_fub5-y8es"><intent_id>635462</intent_id><project_id>726936</project_id><text_data>It is a free standing aluminum platform deck, ramp and stairs assembled at the threshold of the modular building, it is not supported by the modular building.</text_data><comment_date>2014-06-18T00:00:00</comment_date></row><row _id="row-gbqe-ebi7~sdf5" _uuid="00000000-0000-0000-2A3D-296AB19DEDF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbqe-ebi7~sdf5"><intent_id>1518241</intent_id><project_id>1175677</project_id><text_data>#1 Flex hot water tank wiring. #2 Single family mobile home. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2025-03-16T00:00:00</comment_date></row><row _id="row-cimb_2xx2_u5pn" _uuid="00000000-0000-0000-DE22-DBAD83A21F7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cimb_2xx2_u5pn"><intent_id>1164369</intent_id><project_id>972702</project_id><text_data>From: Cassandra Kringelbach &amp;lt;CassandraK@jrjohnsoninc.com&amp;gt;  Sent: Friday, August 6, 2021 11:24 AM To: Dyce, Craig (LNI) &amp;lt;dycc235@LNI.WA.GOV&amp;gt; Cc: Bud Bartunek &amp;lt;BudB@jrjohnsoninc.com&amp;gt; Subject: RE: Intent ID: 1164369External EmailHi Craig,Hoping you can help me � the value I sent in the previous email was ALSO incorrect.We need to note the after tax estimated contract amount for the project as $1,908.92The contract value without tax is $1,761.00 This is the last revision, I promise.Thank you for your time!   Cassandra KringelbachProject CoordinatorE: cassandrak@jrjohnson.com P:503.240.3388 C:971.284.0288www.jrjohnson.comGet connected</text_data><comment_date>2021-08-06T00:00:00</comment_date></row><row _id="row-bbcc~qiuq-v5xy" _uuid="00000000-0000-0000-91F6-7754F6CAE707" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bbcc~qiuq-v5xy"><intent_id>946783</intent_id><project_id>866934</project_id><text_data>#20289, Stewart, Mary 1412 W Cleveland, Spokane#20296, Anderson, Sandra, 730 E Courtland, Spokane#20277, Roche, Carmen, 637 S 3rd, Rockford#20305, Foley, Joann, 13410 E Heroy, Spokane Valley#20290, Polegay, Steven, 2604 E Longfellow, Spokane</text_data><comment_date>2018-11-28T00:00:00</comment_date></row><row _id="row-ffz4_py4f~esga" _uuid="00000000-0000-0000-31D8-1A3ABCDFE404" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ffz4_py4f~esga"><intent_id>810083</intent_id><project_id>805720</project_id><text_data>PPC 16729</text_data><comment_date>2017-01-06T00:00:00</comment_date></row><row _id="row-c6u6_mnfc-a96p" _uuid="00000000-0000-0000-C16F-EBE8D8B11066" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6u6_mnfc-a96p"><intent_id>1195510</intent_id><project_id>967139</project_id><text_data>Install security cameras as per floor plans</text_data><comment_date>2021-11-26T00:00:00</comment_date></row><row _id="row-zrv3~gjgy.68um" _uuid="00000000-0000-0000-3D79-7F84F3B9D9FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zrv3~gjgy.68um"><intent_id>804888</intent_id><project_id>808335</project_id><text_data>1. Where was the �job site� � or where was the pump normally physically located?City of Spokane Solid Waste Disposal 2900 South Geiger Blvd Spokane, WA 99224-5400 Phone 509.625.6527 Contact: Forrest McKinney fmckinney@spokanecity.org and Tia Tauscher ttauscher@spokanecity.org 2. Did your company do any activity at that job site/physical location?No. All work was done at our repair facility in Utah (see below on question 3)3. Where exactly did your company do your �work� on this project?ITT PRO Services 450 West 100 North Salt Lake City, UT 84054</text_data><comment_date>2016-12-07T00:00:00</comment_date></row><row _id="row-xxwf_h86m-jzxd" _uuid="00000000-0000-0000-A533-00A120F8793A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xxwf_h86m-jzxd"><intent_id>701267</intent_id><project_id>763144</project_id><text_data>As a temporary labor service provider Labor Ready is exempt from the requirement to obtain a contractors license.</text_data><comment_date>2015-06-17T00:00:00</comment_date></row><row _id="row-htpx_73m7.izzq" _uuid="00000000-0000-0000-C81E-1E580549B418" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-htpx_73m7.izzq"><intent_id>648620</intent_id><project_id>742101</project_id><text_data>Roof Membrane Recoat</text_data><comment_date>2014-08-18T00:00:00</comment_date></row><row _id="row-3j5g~6yvh-4axw" _uuid="00000000-0000-0000-1AC8-79C2D8C7FA9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3j5g~6yvh-4axw"><intent_id>709475</intent_id><project_id>748971</project_id><text_data>Form filed by:  Dina Marzano</text_data><comment_date>2015-07-23T00:00:00</comment_date></row><row _id="row-ucux-rytq_zuph" _uuid="00000000-0000-0000-025F-3CDE0445C97A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ucux-rytq_zuph"><intent_id>1223989</intent_id><project_id>1007521</project_id><text_data>1.Weatherization 2. single family 3. 1 4. Aa0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2022-04-07T00:00:00</comment_date></row><row _id="row-566x_3zwy~rx8q" _uuid="00000000-0000-0000-B836-1DC2C0D5CD75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-566x_3zwy~rx8q"><intent_id>1084536</intent_id><project_id>911237</project_id><text_data>Spreading compost and planting</text_data><comment_date>2020-08-31T00:00:00</comment_date></row><row _id="row-gxyn_ur4w-fnms" _uuid="00000000-0000-0000-9C20-966F3111C4F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gxyn_ur4w-fnms"><intent_id>621977</intent_id><project_id>731734</project_id><text_data>project number 976982601</text_data><comment_date>2014-03-26T00:00:00</comment_date></row><row _id="row-8uh5~cdzc-hrpw" _uuid="00000000-0000-0000-EA2E-E9B281B7B4EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8uh5~cdzc-hrpw"><intent_id>810334</intent_id><project_id>810825</project_id><text_data>New Contract number 009050</text_data><comment_date>2017-03-13T00:00:00</comment_date></row><row _id="row-8tdv~kzqm-f8y5" _uuid="00000000-0000-0000-BB61-37407CABFEAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8tdv~kzqm-f8y5"><intent_id>614679</intent_id><project_id>723345</project_id><text_data>Sorry! Moved last week,everything was in boxes, couldn't remember correct # off top of head..and was mistaken on what county Auburn is in.</text_data><comment_date>2014-02-04T00:00:00</comment_date></row><row _id="row-qsxh-8z59.ad4c" _uuid="00000000-0000-0000-9A66-5C03DA86904F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qsxh-8z59.ad4c"><intent_id>1137250</intent_id><project_id>956011</project_id><text_data>Lakeside job# 0421046TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2021-04-20T00:00:00</comment_date></row><row _id="row-s8k9~3r43.mrgv" _uuid="00000000-0000-0000-AAE0-72F3F4448742" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s8k9~3r43.mrgv"><intent_id>907753</intent_id><project_id>852020</project_id><text_data>We will provide labor, materials, tools and equipment needed to maintain groundskeeping, irrigation, and sterilization of city owned property located throughout Ellensburg.</text_data><comment_date>2018-05-30T00:00:00</comment_date></row><row _id="row-2u8j.kccm_mnjp" _uuid="00000000-0000-0000-09AB-F042D9E5B97B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2u8j.kccm_mnjp"><intent_id>878646</intent_id><project_id>839149</project_id><text_data>WO #8031562</text_data><comment_date>2017-12-12T00:00:00</comment_date></row><row _id="row-7iem~54ty_yvim" _uuid="00000000-0000-0000-8290-953372D1DF9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7iem~54ty_yvim"><intent_id>1187007</intent_id><project_id>921049</project_id><text_data>PC3Job #4339CB</text_data><comment_date>2021-10-20T00:00:00</comment_date></row><row _id="row-i6bx~meck.5y7f" _uuid="00000000-0000-0000-DC69-3C4760BFF20C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i6bx~meck.5y7f"><intent_id>701950</intent_id><project_id>763957</project_id><text_data>065022</text_data><comment_date>2015-06-19T00:00:00</comment_date></row><row _id="row-u3zy~zmb2.gp6y" _uuid="00000000-0000-0000-9DCB-3A073FD405F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u3zy~zmb2.gp6y"><intent_id>1196735</intent_id><project_id>990069</project_id><text_data>Installing new flooring and countertopsApartmentsTwo storiesNo to all a.-i.YesYesYesNo</text_data><comment_date>2021-12-02T00:00:00</comment_date></row><row _id="row-bgye~2s6a~u5fp" _uuid="00000000-0000-0000-CD1D-D7FE8A6546B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bgye~2s6a~u5fp"><intent_id>513607</intent_id><project_id>688305</project_id><text_data>042088</text_data><comment_date>2012-05-24T00:00:00</comment_date></row><row _id="row-qa7k~pwxq-vi4a" _uuid="00000000-0000-0000-8771-06A7E38A03EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qa7k~pwxq-vi4a"><intent_id>859532</intent_id><project_id>831376</project_id><text_data>Fringe Benefits Plumber/JMH&amp;W              $8.50Nat Pen          $2.86State &amp; Sup Pen  $7.19Train Fund       $0.10ED-Dev           $1.75Idustry Fund     $0.30</text_data><comment_date>2017-08-30T00:00:00</comment_date></row><row _id="row-qtwm-ehsa-wf3a" _uuid="00000000-0000-0000-4F96-704204D80191" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qtwm-ehsa-wf3a"><intent_id>1257801</intent_id><project_id>1026379</project_id><text_data>7026890</text_data><comment_date>2022-08-13T00:00:00</comment_date></row><row _id="row-63wu-d83i_xk7c" _uuid="00000000-0000-0000-8137-8E89F6C12280" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-63wu-d83i_xk7c"><intent_id>935272</intent_id><project_id>862335</project_id><text_data>Note: Workers performing load bank tests must be compensated as Inside Wireman Electricians.</text_data><comment_date>2018-10-05T00:00:00</comment_date></row><row _id="row-6gsu~hs6g~z6gx" _uuid="00000000-0000-0000-FDA4-2177187BD701" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6gsu~hs6g~z6gx"><intent_id>493342</intent_id><project_id>683184</project_id><text_data>We were hired by Kidder Mathews (agent for the owner) to perform monthly landscape maintenance at 1937 S. Fawcett Tacoma, WA. We will perform the following services every other week for the duration of the contract (1 year). Services: Mowing, raking, weeding, blowing &amp; clean up of debris, pressure washing. Tools: 21&amp;quot; Honda mower, rakes, hand shovels, backpack blower, pressure washer. Price: 313.50 per month - Year long contract. Email: sherri@clslandscapeservices.com</text_data><comment_date>2011-12-13T00:00:00</comment_date></row><row _id="row-b2dd~48tq-c8tf" _uuid="00000000-0000-0000-E6CD-82FCEA522BC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b2dd~48tq-c8tf"><intent_id>702193</intent_id><project_id>763593</project_id><text_data>General Labor - assist with site clean up etc.Other truck - semi lowboy for mobilization, water truck for dust control etc.</text_data><comment_date>2015-06-19T00:00:00</comment_date></row><row _id="row-xumd.29p2_8apm" _uuid="00000000-0000-0000-9DE7-DD027F141A99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xumd.29p2_8apm"><intent_id>644249</intent_id><project_id>740456</project_id><text_data>#1 - Attic insulation upgrades including insulation, baffles, foam penetrations, weatherstrip access, and install bath vents.#2 - Single family#3 - One level#4 - (a) no, (b) no, (c) yes, (d) no, (e) no, (f) no, (g) no, (h) no, (i) no, (j) no, (k) no#5 - yes (one dwelling unit; residential home)#6 - yes (one dwelling unit; residential home)#7 - no#8 - no</text_data><comment_date>2014-07-29T00:00:00</comment_date></row><row _id="row-xdkk_k757.xnbv" _uuid="00000000-0000-0000-3FC4-5B8F8DDA1295" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdkk_k757.xnbv"><intent_id>1084353</intent_id><project_id>930929</project_id><text_data>Fringes: Vacation $4.00, Assessment $1.30, Insurance $9.01, Pension $14.55, Training $2.08, Industry Improvement $.50</text_data><comment_date>2020-08-28T00:00:00</comment_date></row><row _id="row-cyrq_p8dd_j7vh" _uuid="00000000-0000-0000-5E55-A6D32981B1E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cyrq_p8dd_j7vh"><intent_id>924263</intent_id><project_id>856702</project_id><text_data>Fringe BreakdownLABORERS:  $12.45H &amp; W   = $6.40Pension = $5.25Training= $0.70Trust     = $0.10OPERATORS:  $15.95H &amp; W   = $7.35Pension = $7.95Training= $0.65TEAMSTERS:  $17.30H &amp; W   = $10.30Pension = $6.60Training= $0.40</text_data><comment_date>2018-08-08T00:00:00</comment_date></row><row _id="row-8g75~9zgc.59h6" _uuid="00000000-0000-0000-E9A3-79C895107D2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8g75~9zgc.59h6"><intent_id>825014</intent_id><project_id>810084</project_id><text_data>A. This project was a water damage repair requiring demolition and drying of drywall walls, cabinets, flooring, insulation. . B. Our part was all of that description. C. The PR guys were doing selective demolition with hammers, pry bars, garbage cans. They were primarily packing out the debris a distance to the dump trailer and cleaning up as demolition was taking place.</text_data><comment_date>2017-04-12T00:00:00</comment_date></row><row _id="row-qg4z_qfeg_v2wr" _uuid="00000000-0000-0000-A7BC-CEB855C20389" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qg4z_qfeg_v2wr"><intent_id>672858</intent_id><project_id>752223</project_id><text_data>Installation of (12) 2 gallon trees in planting bed in park. Trees installed using hand tools.</text_data><comment_date>2015-01-09T00:00:00</comment_date></row><row _id="row-tx5w_zzkf_ygm7" _uuid="00000000-0000-0000-2B58-28781741B1B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tx5w_zzkf_ygm7"><intent_id>927903</intent_id><project_id>853572</project_id><text_data>tree removal</text_data><comment_date>2018-08-23T00:00:00</comment_date></row><row _id="row-j8kp.yuyd.bwcx" _uuid="00000000-0000-0000-06BB-045708B5205B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j8kp.yuyd.bwcx"><intent_id>858520</intent_id><project_id>830966</project_id><text_data>Install new cables that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-08-25T00:00:00</comment_date></row><row _id="row-byfr_bary.px9h" _uuid="00000000-0000-0000-94FC-69708C5ABBC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-byfr_bary.px9h"><intent_id>735132</intent_id><project_id>779057</project_id><text_data>Cut down hazardous Alder trees to snags and leave debris in the NGPA</text_data><comment_date>2015-12-03T00:00:00</comment_date></row><row _id="row-z8ex-4yu7~quuq" _uuid="00000000-0000-0000-C6E1-8EF7C13E1829" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z8ex-4yu7~quuq"><intent_id>854979</intent_id><project_id>828155</project_id><text_data>Job Site: 6910 NE 170th St. Kenmore, WA 98028</text_data><comment_date>2017-08-15T00:00:00</comment_date></row><row _id="row-pqcc-m4zx_kat6" _uuid="00000000-0000-0000-757C-60F8A135C2B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqcc-m4zx_kat6"><intent_id>1001339</intent_id><project_id>884831</project_id><text_data>'TRUCK DRIVER - OTHER' USED FOR TRUCK MOUNTED PICK UP SWEEPER</text_data><comment_date>2019-08-21T00:00:00</comment_date></row><row _id="row-v2zn~saha_tmqv" _uuid="00000000-0000-0000-BFEF-CEFF5FAF0699" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v2zn~saha_tmqv"><intent_id>875563</intent_id><project_id>837773</project_id><text_data>Job #113344-001</text_data><comment_date>2017-11-17T00:00:00</comment_date></row><row _id="row-22bx~cekc-bf89" _uuid="00000000-0000-0000-CA2A-44C690D54B7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22bx~cekc-bf89"><intent_id>481072</intent_id><project_id>675421</project_id><text_data>This work was done on a Sunday Night, emergency services.  We called several times to verify the wage rate.</text_data><comment_date>2011-09-29T00:00:00</comment_date></row><row _id="row-vipb-52qd-pthy" _uuid="00000000-0000-0000-5C3C-E5C62DC7DAE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vipb-52qd-pthy"><intent_id>1214751</intent_id><project_id>1001500</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. GA2054Filed By Brook</text_data><comment_date>2022-03-01T00:00:00</comment_date></row><row _id="row-89fc.ufrr-hq39" _uuid="00000000-0000-0000-0E74-6DD0BADD3E5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89fc.ufrr-hq39"><intent_id>886577</intent_id><project_id>842920</project_id><text_data>ACI 17-030</text_data><comment_date>2018-02-05T00:00:00</comment_date></row><row _id="row-zj3u-j53f.x3cg" _uuid="00000000-0000-0000-61B6-F1C904E3E3AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zj3u-j53f.x3cg"><intent_id>816181</intent_id><project_id>813573</project_id><text_data>Telecom tech(09)Telephone and data cabling for office cubiclesinside work</text_data><comment_date>2017-02-15T00:00:00</comment_date></row><row _id="row-is3u_4x9k~mwi4" _uuid="00000000-0000-0000-4C27-488B0DD6A98F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-is3u_4x9k~mwi4"><intent_id>683103</intent_id><project_id>757349</project_id><text_data>INSTALLING CATEGORY 6 TELECOMMUNICATIONS CABLING IN BUILDING AS REQUESTED</text_data><comment_date>2015-03-11T00:00:00</comment_date></row><row _id="row-si7n_3iir-2wd8" _uuid="00000000-0000-0000-545A-089A2E8278EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-si7n_3iir-2wd8"><intent_id>750576</intent_id><project_id>772201</project_id><text_data>Filed by Rosie Grathwohl</text_data><comment_date>2016-03-09T00:00:00</comment_date></row><row _id="row-mgmr~qsgy.xxfi" _uuid="00000000-0000-0000-2F3D-AF47A03D2362" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mgmr~qsgy.xxfi"><intent_id>727194</intent_id><project_id>759339</project_id><text_data>This job will consist of irrigation, top soil placement and planting of trees and shrubs. Irrigation depth will 18&amp;quot; and the trenches will be dug by hand. We will be using a light duty skid steer bobcat for topsoil placement. We will first install irrigation, next we will place the topsoil and last we will be planting the trees and shrubs.</text_data><comment_date>2015-10-20T00:00:00</comment_date></row><row _id="row-2we5~7ujv_96z6" _uuid="00000000-0000-0000-A0B1-7CD217569C4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2we5~7ujv_96z6"><intent_id>838050</intent_id><project_id>816150</project_id><text_data>Order 803191</text_data><comment_date>2017-06-04T00:00:00</comment_date></row><row _id="row-6d5c~fk7n.jnuk" _uuid="00000000-0000-0000-46F2-9C26DAD1FFDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6d5c~fk7n.jnuk"><intent_id>1043853</intent_id><project_id>911518</project_id><text_data>7022705</text_data><comment_date>2020-03-09T00:00:00</comment_date></row><row _id="row-2q4b~ra2y_fwy8" _uuid="00000000-0000-0000-DBAF-E9830DC40BA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2q4b~ra2y_fwy8"><intent_id>1128341</intent_id><project_id>954048</project_id><text_data>we are installing a new irrigation pump provided by the school district and connecting it.</text_data><comment_date>2021-03-12T00:00:00</comment_date></row><row _id="row-8d8k~9y32_6vq6" _uuid="00000000-0000-0000-52F2-BC97188A83E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8d8k~9y32_6vq6"><intent_id>1218075</intent_id><project_id>887615</project_id><comment_date>2022-03-15T00:00:00</comment_date></row><row _id="row-2zeb.ja4k~hdzw" _uuid="00000000-0000-0000-3538-98052608D9A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2zeb.ja4k~hdzw"><intent_id>668348</intent_id><project_id>749408</project_id><text_data>044291</text_data><comment_date>2014-12-04T00:00:00</comment_date></row><row _id="row-5iba_ccx5.4bph" _uuid="00000000-0000-0000-C0ED-FADC9B973C97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5iba_ccx5.4bph"><intent_id>846299</intent_id><project_id>826679</project_id><text_data>Plumbers will cut, cap and make safe the piping. Laborers will demolish and remove piping after plumbers have disconnected.</text_data><comment_date>2017-07-10T00:00:00</comment_date></row><row _id="row-8a58~6nf3_9ujk" _uuid="00000000-0000-0000-486A-4200B179C717" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8a58~6nf3_9ujk"><intent_id>515404</intent_id><project_id>682534</project_id><text_data>Filed by: Michael Hummel1.  Provide upgrade to constant volume terminal boxes to variable volume.2.  No.3.  Siemens' BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process.  While off-site, the BAU Technicians create a computerized schematic of a particular building's HVAC automations system.  That system is used to control the system's functions after the mechanical commissioning process is complete.  Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer.  The BAU Technician typically sits in a central control room and manipulates the system using a computer program.  The program itself informs the Technician whether various components are functioning properly as they are triggered.  If a component doesn't appear to be functioning properly, the Technician will typically advice the applicable subcontractor about the problem and recheck the system once the problem is rectified.  After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface.  Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.4.  Laptop Computer5.  No - None</text_data><comment_date>2012-06-06T00:00:00</comment_date></row><row _id="row-x2wn_5uzj_yyqc" _uuid="00000000-0000-0000-2BD8-8F4D1CF74BEC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x2wn_5uzj_yyqc"><intent_id>672454</intent_id><project_id>749268</project_id><text_data>MMFS Job#73147170</text_data><comment_date>2015-01-07T00:00:00</comment_date></row><row _id="row-kiei~sk4m.6zht" _uuid="00000000-0000-0000-9847-43A5C8408E58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kiei~sk4m.6zht"><intent_id>903168</intent_id><project_id>850175</project_id><text_data>Patching:�	Saw cut out damaged asphalt . �	Patch and repair with 3� class B asphalt. �	Compact and seal edgesCrack Seal: �	Fill cracks with rubberized material</text_data><comment_date>2018-05-07T00:00:00</comment_date></row><row _id="row-zapa_46hf-x759" _uuid="00000000-0000-0000-FF46-C58ED480852E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zapa_46hf-x759"><intent_id>1218455</intent_id><project_id>966691</project_id><text_data>121770-001</text_data><comment_date>2022-03-16T00:00:00</comment_date></row><row _id="row-eguu_a499-uafx" _uuid="00000000-0000-0000-50C8-F801D3185F68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eguu_a499-uafx"><intent_id>576490</intent_id><project_id>713736</project_id><text_data>1139118  KEN COOK</text_data><comment_date>2013-06-20T00:00:00</comment_date></row><row _id="row-6tfg-jpup_rv4q" _uuid="00000000-0000-0000-5444-5C19F092B0EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6tfg-jpup_rv4q"><intent_id>589348</intent_id><project_id>718374</project_id><text_data>Workmans Comp thru Liberty NW - IdahoOther Truck 4000 Gallon Water Truck will be used for water for compaction and dust control</text_data><comment_date>2013-08-22T00:00:00</comment_date></row><row _id="row-yybp~xvqh_ykbi" _uuid="00000000-0000-0000-6B4C-7CE0C93CDCB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yybp~xvqh_ykbi"><intent_id>560655</intent_id><project_id>705138</project_id><text_data>GENERAL LABORER:  PERFORMS FINAL CLEANUP AFTER THE CONSTRUCTION HAS BEEN COMPLETED.  TRK DRIVER/OTHER TRUCK:  WATER TRKS HOLD UP TO 4000 GA OF WATER &amp; ARE USED FOR DUST CONTROL.</text_data><comment_date>2013-03-19T00:00:00</comment_date></row><row _id="row-gwmv-uvhp-f2n3" _uuid="00000000-0000-0000-7182-088D28DBD676" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gwmv-uvhp-f2n3"><intent_id>1073911</intent_id><project_id>926230</project_id><text_data>9851088</text_data><comment_date>2020-07-21T00:00:00</comment_date></row><row _id="row-5trv-pcnj-9dgf" _uuid="00000000-0000-0000-A217-755E4F949036" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5trv-pcnj-9dgf"><intent_id>894879</intent_id><project_id>843647</project_id><text_data>H2O Well Service, Inc. is an Idaho employer, and we bring our employees from Idaho to do work.  Workers compensation is with the Idaho State Insurance Fund, policy 527115, Unemployment State of Idaho account #000975583.</text_data><comment_date>2018-03-26T00:00:00</comment_date></row><row _id="row-5fdb~4axt_wenv" _uuid="00000000-0000-0000-3789-BE0661AEAC8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fdb~4axt_wenv"><intent_id>508168</intent_id><project_id>686180</project_id><text_data>Form filed by: Tim Crain - murq235</text_data><comment_date>2012-04-17T00:00:00</comment_date></row><row _id="row-s95b_p7w9.5n92" _uuid="00000000-0000-0000-4666-254DC23F33F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s95b_p7w9.5n92"><intent_id>592258</intent_id><project_id>719434</project_id><text_data>Provide and install network and telephone cable between instruments, terminals and sets and the connections to the distribution cable.Provide and install Blocks and Subpanels where large feed cables terminate at the distribution frames in the IDF or MDFProvide and install riser cables between floors from the MDF to the IDFLabel and test the cable</text_data><comment_date>2013-09-06T00:00:00</comment_date></row><row _id="row-zu66_bdmw_s367" _uuid="00000000-0000-0000-C133-140CC9D4D699" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zu66_bdmw_s367"><intent_id>1236430</intent_id><project_id>1014949</project_id><text_data>April Storm-583344</text_data><comment_date>2022-05-25T00:00:00</comment_date></row><row _id="row-bsbf~8wyq~abf5" _uuid="00000000-0000-0000-41DF-F3B64E60120E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bsbf~8wyq~abf5"><intent_id>686077</intent_id><project_id>693065</project_id><text_data>Filed by Linda Burke</text_data><comment_date>2015-03-27T00:00:00</comment_date></row><row _id="row-ywu8.njdu_45id" _uuid="00000000-0000-0000-1B1B-004B4B371A41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ywu8.njdu_45id"><intent_id>597961</intent_id><project_id>712114</project_id><text_data>Filed by Tony King</text_data><comment_date>2013-10-07T00:00:00</comment_date></row><row _id="row-vw44.93tq_iwtz" _uuid="00000000-0000-0000-7569-648545C0DFF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vw44.93tq_iwtz"><intent_id>492387</intent_id><project_id>679082</project_id><text_data>Answer to Corrections #1 Apartment, #2 No Basement or Garage, 2 levels #3 Other-low income housing facility, #4 has own self contained kitchen, #5 has own bathroom, #6 There is a managers office on site, #7 The faciity is not used by the public.</text_data><comment_date>2011-12-09T00:00:00</comment_date></row><row _id="row-kscp-cau8.cmip" _uuid="00000000-0000-0000-B6F9-975863771C40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kscp-cau8.cmip"><intent_id>599456</intent_id><project_id>704589</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR DRIVER - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH OIL/TACK PRIOR TO PLACING ASPHALT</text_data><comment_date>2013-10-15T00:00:00</comment_date></row><row _id="row-7zgq.3s6e~94r9" _uuid="00000000-0000-0000-93EE-B4BE5DB6F501" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zgq.3s6e~94r9"><intent_id>508956</intent_id><project_id>682739</project_id><text_data>Filed by: Dale TakamireProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.01.  Workers will be paid in accordance with DAvis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2012-04-24T00:00:00</comment_date></row><row _id="row-44ir.pt4m.2n7p" _uuid="00000000-0000-0000-093A-C1EC4C8D149E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-44ir.pt4m.2n7p"><intent_id>506636</intent_id><project_id>685425</project_id><text_data>Remove grass and soil to a depth of 6 inches.  Install gravel path.  move irrigation heads and adjust.  Small hand tools, wheelbarrow.</text_data><comment_date>2012-04-05T00:00:00</comment_date></row><row _id="row-m46h.nwjs~in4z" _uuid="00000000-0000-0000-2792-3C68F7E03570" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m46h.nwjs~in4z"><intent_id>598591</intent_id><project_id>721710</project_id><text_data>Repairs to WFP#1, WFP#2 and WFP#3</text_data><comment_date>2013-10-09T00:00:00</comment_date></row><row _id="row-zbbc.fxhw_vxcx" _uuid="00000000-0000-0000-B526-9C6778B9A341" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zbbc.fxhw_vxcx"><intent_id>486194</intent_id><project_id>677138</project_id><text_data>Fringe benefit equals 1.60 per hour health insurance, .96 VacationSub Contractor is All Valley Electric, UBI 601 738 938 Contractor# ALLVAE*034D5</text_data><comment_date>2011-10-27T00:00:00</comment_date></row><row _id="row-qcfa~mc7h.2nqq" _uuid="00000000-0000-0000-3418-9165560A68AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qcfa~mc7h.2nqq"><intent_id>529892</intent_id><project_id>693082</project_id><text_data>owner will do work</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-mfv3.dsfm-nt7i" _uuid="00000000-0000-0000-4708-F9882D37BB34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mfv3.dsfm-nt7i"><intent_id>709656</intent_id><project_id>768201</project_id><text_data>1.     Upgrade existing UPS subpanel to a 70 amp 3Ph.2.     Three new 20 amp 120 volt branch circuits in UPS subpanel a) each circuit has a NEMA L5-20R to be surface mounted to the cable ladder.3.     Permanent labelling on new circuitry on outlet box. All new raceways will be EMT with compression fittings.4.     Install 10 locations of 6-Cat 6 jacks, 1 set on each power pole.5.     Install patch panels and wire management in the rack provided.6.     Test and label all.</text_data><comment_date>2015-07-23T00:00:00</comment_date></row><row _id="row-4tgs~rz2e_2h9s" _uuid="00000000-0000-0000-D282-53D793C78FFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4tgs~rz2e_2h9s"><intent_id>875202</intent_id><project_id>817395</project_id><text_data>PN # 45689SEA</text_data><comment_date>2017-11-16T00:00:00</comment_date></row><row _id="row-jksf_qzks~z46k" _uuid="00000000-0000-0000-0336-E558ECC78028" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jksf_qzks~z46k"><intent_id>865576</intent_id><project_id>794236</project_id><text_data>Using a CAD Truck to bring in and place material on-site</text_data><comment_date>2017-09-27T00:00:00</comment_date></row><row _id="row-2w26.dnzf-dkfe" _uuid="00000000-0000-0000-4130-EFE942217369" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2w26.dnzf-dkfe"><intent_id>660034</intent_id><project_id>739387</project_id><text_data>Provide and install voice and data cabling.  Provide and install surveillance cameras</text_data><comment_date>2014-10-30T00:00:00</comment_date></row><row _id="row-qj3h-paqp-ex86" _uuid="00000000-0000-0000-A53E-0A6FF8AE7F76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qj3h-paqp-ex86"><intent_id>486318</intent_id><project_id>671236</project_id><text_data>Truck Drivers are 10 to 12 yard end dump trucks, they haul rock and asphalt for paving and road construction.  Truck and pup drivers haul 20 to 24 yards.  They are also end dump and haul rock and asphalt for highway paving and road construction. Other Truck is 0-8,000 gallon water trucks used for asphalt paving to fill finish rollers on the job.  General laborers manually shovel rock and asphalt at the job sites on highway paving and road construction jobs.  They do not operated machinery or vehicles while shoveling rock and or asphalt.</text_data><comment_date>2011-10-28T00:00:00</comment_date></row><row _id="row-43iq.mx52_49ab" _uuid="00000000-0000-0000-3BFA-05C5876E4366" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-43iq.mx52_49ab"><intent_id>740117</intent_id><project_id>781976</project_id><text_data>Filed by Paul Diefenbad</text_data><comment_date>2016-01-05T00:00:00</comment_date></row><row _id="row-vyys.4c9j-yw9i" _uuid="00000000-0000-0000-9AA7-0318647EA599" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vyys.4c9j-yw9i"><intent_id>538087</intent_id><project_id>642280</project_id><text_data>We are amending our existing intend based on L&amp;I auditing.</text_data><comment_date>2012-10-03T00:00:00</comment_date></row><row _id="row-qgg2~89ax-h397" _uuid="00000000-0000-0000-2DB1-457097AF1394" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qgg2~89ax-h397"><intent_id>538850</intent_id><project_id>697502</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-11T00:00:00</comment_date></row><row _id="row-5m8e.uj3s-ypr2" _uuid="00000000-0000-0000-C2C1-AE232C46D8A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5m8e.uj3s-ypr2"><intent_id>527469</intent_id><project_id>686977</project_id><text_data>form filed by: Rosie Grathwohl - petu235</text_data><comment_date>2012-08-09T00:00:00</comment_date></row><row _id="row-vyex_re4h_kwur" _uuid="00000000-0000-0000-758D-0CE48E8B36BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vyex_re4h_kwur"><intent_id>984239</intent_id><project_id>882790</project_id><text_data>No fringes paid</text_data><comment_date>2019-06-12T00:00:00</comment_date></row><row _id="row-bt57_bnsq.t46s" _uuid="00000000-0000-0000-D909-51CC01EF502E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bt57_bnsq.t46s"><intent_id>1041101</intent_id><project_id>891585</project_id><text_data>Install underground irrigation 16'-24'. Place top soil 8' depth. Install plants, per plans place beauty bark. Tools using shovel, rakes, wheel barrow, and small skid steer 40hp.</text_data><comment_date>2020-02-26T00:00:00</comment_date></row><row _id="row-2d5v~sins_avme" _uuid="00000000-0000-0000-FDE5-BA12355C1DDB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2d5v~sins_avme"><intent_id>1181348</intent_id><project_id>982409</project_id><text_data>Dump truck to be loaded on site and to take materials for disposalBackhoe to dig up contaminates oils and load into dump truck</text_data><comment_date>2021-10-06T00:00:00</comment_date></row><row _id="row-d9mi-ur7g_3iw7" _uuid="00000000-0000-0000-ED95-CD1B01A1C144" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d9mi-ur7g_3iw7"><intent_id>543481</intent_id><project_id>699293</project_id><text_data>Hand Spray Liquid Fertilizer and Moss Control</text_data><comment_date>2012-11-07T00:00:00</comment_date></row><row _id="row-c3ky_zpaf-ntyp" _uuid="00000000-0000-0000-49DD-20735604FC00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c3ky_zpaf-ntyp"><intent_id>910559</intent_id><project_id>853107</project_id><text_data>Filed by Tracy Middlebrook</text_data><comment_date>2018-06-12T00:00:00</comment_date></row><row _id="row-i7nc.k83f~wpxp" _uuid="00000000-0000-0000-AFE3-3FF5409FBD90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7nc.k83f~wpxp"><intent_id>884614</intent_id><project_id>842030</project_id><text_data>Job #112993-001</text_data><comment_date>2018-01-23T00:00:00</comment_date></row><row _id="row-n36t.cxi3-kjys" _uuid="00000000-0000-0000-40F9-531DA68A9660" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n36t.cxi3-kjys"><intent_id>576073</intent_id><project_id>710914</project_id><text_data>Filed by Dave Rahn</text_data><comment_date>2013-06-18T00:00:00</comment_date></row><row _id="row-za9s~e5xv~j5t7" _uuid="00000000-0000-0000-90D7-428904193531" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-za9s~e5xv~j5t7"><intent_id>913460</intent_id><project_id>854218</project_id><text_data>Disconnect 3 Portables for new Multipurpose Room</text_data><comment_date>2018-06-24T00:00:00</comment_date></row><row _id="row-368q~meyv-njq7" _uuid="00000000-0000-0000-B27D-20DDDD8C875B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-368q~meyv-njq7"><intent_id>623536</intent_id><project_id>732414</project_id><text_data>None</text_data><comment_date>2014-04-07T00:00:00</comment_date></row><row _id="row-qhzu-eu2t_ei9z" _uuid="00000000-0000-0000-477D-3C459C6F6670" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qhzu-eu2t_ei9z"><intent_id>780974</intent_id><project_id>799240</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2016-08-09T00:00:00</comment_date></row><row _id="row-sbt8~774x_k7ft" _uuid="00000000-0000-0000-04A7-35E4AE4C9C0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sbt8~774x_k7ft"><intent_id>820894</intent_id><project_id>815667</project_id><text_data>Transformers will be picked up on Valley Transformers Semi-Truck by our driver.  The units will be loaded by the City of Ellensburg by the employees of City of Ellensburg.  Units will be brought to the Otis Orchards shop and unloaded by forklift.  All units will be tested with turns ratio tester and voltage tester by shop technician.  Units then will be opened with wrenches and components will be disassembled and reinstalled with new components.  Units are then re-sealed, units are then moved to our sanding area, where they are lightly scuffed and cleaned for paint preparation.   Units are spray painted, tape removed, porcelain bushing cleaned with steel wool, and reloaded to ship back to utility.  Driver will return units back to the City of Ellensburg.</text_data><comment_date>2017-03-27T00:00:00</comment_date></row><row _id="row-p7kx~miyv.has7" _uuid="00000000-0000-0000-8391-3007100A8DC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7kx~miyv.has7"><intent_id>1248084</intent_id><project_id>1021396</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors</text_data><comment_date>2022-07-12T00:00:00</comment_date></row><row _id="row-t3hz.i5dd.6u73" _uuid="00000000-0000-0000-C449-970798DCBDE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3hz.i5dd.6u73"><intent_id>495670</intent_id><project_id>680850</project_id><text_data>Job # 288802</text_data><comment_date>2012-01-05T00:00:00</comment_date></row><row _id="row-j9hb-wuma-d9cj" _uuid="00000000-0000-0000-AC7F-EBA5F9381454" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j9hb-wuma-d9cj"><intent_id>778135</intent_id><project_id>770434</project_id><text_data>ICON Project # 1160003  - Carver Academic Renovation</text_data><comment_date>2016-07-27T00:00:00</comment_date></row><row _id="row-vqrj.inx8~vkj2" _uuid="00000000-0000-0000-02DA-5BFA42289CEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vqrj.inx8~vkj2"><intent_id>690534</intent_id><project_id>721306</project_id><text_data>SKANSKA #4213006-02300.000 ARCF - EARTHWORK &amp; SITE UTILITIES</text_data><comment_date>2015-04-22T00:00:00</comment_date></row><row _id="row-4y4t.3ugx~9esz" _uuid="00000000-0000-0000-C0E5-1EB40F52E04C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4y4t.3ugx~9esz"><intent_id>851451</intent_id><project_id>828697</project_id><text_data>GU Job #17209Truck Driver - to transport equipment to job site.</text_data><comment_date>2017-07-31T00:00:00</comment_date></row><row _id="row-eh9y~yki4-cy35" _uuid="00000000-0000-0000-389F-3E964EF431E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eh9y~yki4-cy35"><intent_id>1174773</intent_id><project_id>973419</project_id><text_data>GC20906</text_data><comment_date>2021-09-02T00:00:00</comment_date></row><row _id="row-tr57_dmqb.854g" _uuid="00000000-0000-0000-3A46-41E3E26B1A03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tr57_dmqb.854g"><intent_id>664316</intent_id><project_id>739221</project_id><text_data>Form filed by: Timothy O Calhoun</text_data><comment_date>2014-11-06T00:00:00</comment_date></row><row _id="row-qzr3~gkx3.nxit" _uuid="00000000-0000-0000-C698-512BBC253516" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qzr3~gkx3.nxit"><intent_id>1116955</intent_id><project_id>947541</project_id><text_data>#1 � The crew will be installing a DHP, replacing bath fans and range hood, installing HRV and installing Smoke Alarms and CO Detectors.#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2021-01-21T00:00:00</comment_date></row><row _id="row-esq7_nkds.nnb7" _uuid="00000000-0000-0000-C331-F62BAF959631" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-esq7_nkds.nnb7"><intent_id>1140573</intent_id><project_id>960161</project_id><text_data>NorthSound Refrigeration invoice #2021-1883</text_data><comment_date>2021-04-28T00:00:00</comment_date></row><row _id="row-7b8s~4jub-5zrt" _uuid="00000000-0000-0000-B8D3-03AAC5688476" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7b8s~4jub-5zrt"><intent_id>1000157</intent_id><project_id>890476</project_id><text_data>There will be planting anThere will be planting done by landscape laborers on this job.  They will also be placing bark in the planting areas.</text_data><comment_date>2019-08-16T00:00:00</comment_date></row><row _id="row-gw3k-w4d7.h4xc" _uuid="00000000-0000-0000-5234-E96F420E2071" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gw3k-w4d7.h4xc"><intent_id>724537</intent_id><project_id>761157</project_id><text_data>Fowler General Contractor is building a new elementary school (Sage Crest). Our part is the landscaping which includes the installation of irrigation, and plant material.  For the Landscape Irrigation portion of the project, we will use manual labor for digging the trenches and installing the irrigation material. Sod, weed fabric, 1-1/2&amp;quot; rock and basalt boulders will be added as part of the landscaping, the curbing will be done by a hired subcontractor (Artistic Curbing). We will be using two (2) Bobcats with a power rake, auger and bucket attachments. The horse power for our T-190 is 56 and our S205 is 61. The bobcats are used for some trenching, digging holes, raking and placing the boulders.</text_data><comment_date>2015-10-05T00:00:00</comment_date></row><row _id="row-ph3p.e8dn.f3es" _uuid="00000000-0000-0000-6F1A-24CFF7BB3407" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ph3p.e8dn.f3es"><intent_id>1162761</intent_id><project_id>971932</project_id><text_data>I needed to make a correction concerning the contract number.</text_data><comment_date>2021-08-06T00:00:00</comment_date></row><row _id="row-sf3z~28j3.c5nu" _uuid="00000000-0000-0000-4F03-85A6BA82BB62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sf3z~28j3.c5nu"><intent_id>1119623</intent_id><project_id>949035</project_id><text_data>#1: Diagnose and repair leaking shower valve in wall.#2: Apartment#3: 3 Floors#4: Multi-Family HousingA: NoB: NoC: YesD: NoE: NoF: NoG: NoI: No#5. Yes#6: Yes#7: No#8: No</text_data><comment_date>2021-02-02T00:00:00</comment_date></row><row _id="row-g22z-asdh~6izq" _uuid="00000000-0000-0000-28D4-CE441E552485" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g22z-asdh~6izq"><intent_id>1084003</intent_id><project_id>930782</project_id><text_data>Install telephone wiring between Bar Screen Panel and Headworks Panel within the existing building</text_data><comment_date>2020-08-27T00:00:00</comment_date></row><row _id="row-8jqp.h4pc_kcf9" _uuid="00000000-0000-0000-4E36-F5C6B525F74A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8jqp.h4pc_kcf9"><intent_id>672546</intent_id><project_id>751843</project_id><text_data>ALL PER HOUR-Health &amp; Welfare $7.68, SBA $0.72, Annuity $6.25, Apprentice Cont $0.70, ( National $1.21 )</text_data><comment_date>2015-01-07T00:00:00</comment_date></row><row _id="row-x3bd~zy3h-jtk8" _uuid="00000000-0000-0000-2F23-0B3467384620" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3bd~zy3h-jtk8"><intent_id>1284339</intent_id><project_id>1041337</project_id><text_data>Inside workElect tech(06)install new network cabling for new office space</text_data><comment_date>2022-11-17T00:00:00</comment_date></row><row _id="row-kvbd_g7yx_9r4b" _uuid="00000000-0000-0000-4A54-B3563429D1C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvbd_g7yx_9r4b"><intent_id>739306</intent_id><project_id>777231</project_id><text_data>We are an Oregon based company, our workmanscomp policy covers the employees working in Washington</text_data><comment_date>2015-12-28T00:00:00</comment_date></row><row _id="row-hiev-a4ju_7znf" _uuid="00000000-0000-0000-86B2-D1E33E47AD81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hiev-a4ju_7znf"><intent_id>1171121</intent_id><project_id>965200</project_id><text_data>Prevailing wage training has been completed</text_data><comment_date>2021-08-27T00:00:00</comment_date></row><row _id="row-e3dr-692e_2n5h" _uuid="00000000-0000-0000-25FF-D6D7B7AA5D8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e3dr-692e_2n5h"><intent_id>620574</intent_id><project_id>722709</project_id><text_data>Beautification of area adjacent to roadway through the installation of plants, shrubs, irrigation, topsoil.Equip.: Bobcat, hand tools</text_data><comment_date>2014-03-17T00:00:00</comment_date></row><row _id="row-4ney_ijfj-9zdh" _uuid="00000000-0000-0000-C227-EC39834538B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ney_ijfj-9zdh"><intent_id>456070</intent_id><project_id>666193</project_id><text_data>We pay our journeyman $27 per hour. The apprentices we pay $17 per hour. I can't see on the form where to put in the hourly rates. Please call 360-647-2427 if you can tell me where I am missing something.  Jim.</text_data><comment_date>2011-05-23T00:00:00</comment_date></row><row _id="row-z7wa_294p~3uv2" _uuid="00000000-0000-0000-BF53-3C6DAB1FEE36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7wa_294p~3uv2"><intent_id>626655</intent_id><project_id>733721</project_id><text_data>Fringe - Journeyman: Pension $16.87 and Training $1.27</text_data><comment_date>2014-04-25T00:00:00</comment_date></row><row _id="row-m823-bdwp.icka" _uuid="00000000-0000-0000-536B-3B25764771C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m823-bdwp.icka"><intent_id>1014396</intent_id><project_id>895773</project_id><text_data>#1: We were contracted to install 47 thermostats and 22 exhaust fans for apartment units. #2: Apartment Complex. #3: 4. #4: Residential homes. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K) Yes, #5: Yes, #6: Yes, #7: No, #8: No.</text_data><comment_date>2019-10-09T00:00:00</comment_date></row><row _id="row-2v2z.ez46.zeyw" _uuid="00000000-0000-0000-4719-69328E805F9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2v2z.ez46.zeyw"><intent_id>1262619</intent_id><project_id>1028836</project_id><text_data>Other truck = Lowboy and Water Trucks</text_data><comment_date>2022-08-30T00:00:00</comment_date></row><row _id="row-3c7j.mkdn-49wf" _uuid="00000000-0000-0000-64DF-B72CCAF2692F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3c7j.mkdn-49wf"><intent_id>1274000</intent_id><project_id>1034992</project_id><comment_date>2022-10-11T00:00:00</comment_date></row><row _id="row-qr78.m69j~52xd" _uuid="00000000-0000-0000-FEAF-33946A3FBA52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qr78.m69j~52xd"><intent_id>636518</intent_id><project_id>733347</project_id><text_data>Form filed by: Michael HummelExemption Intent Questionnaire form � Central Campus Steam UpgradesPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.	What is the specific purpose of this awarding agency's public works project? Remodel of existing building.2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No3. Does this project entail the remodeling or new construction of a facility? Yes, but not performed by Siemens Employees.4. If your firm is working upon a type of building system, what type of system is involved? HVAC/refrigeration control system5. What specific tasks did your employees perform? Siemens' BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system's functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs a Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.6. What, if any, tools did your employees use in the performance of those tasks? Laptop computer.7. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No - None.8. Are you going to be hiring any subcontractors for this project? Yes***************************To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification�, �commissioning� or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2014-06-20T00:00:00</comment_date></row><row _id="row-b2ce-5w3q~uxkt" _uuid="00000000-0000-0000-D307-C38484F60AF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b2ce-5w3q~uxkt"><intent_id>558103</intent_id><project_id>703489</project_id><text_data>OFF-SITE PRODUCTION - NO WORK DONE AT THE LOCATION</text_data><comment_date>2013-02-28T00:00:00</comment_date></row><row _id="row-e85p~zrk2-ek55" _uuid="00000000-0000-0000-A46D-8EF8ECC91DE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e85p~zrk2-ek55"><intent_id>619925</intent_id><project_id>730771</project_id><text_data>DEI Job 13498</text_data><comment_date>2014-03-12T00:00:00</comment_date></row><row _id="row-rv45-devi~radv" _uuid="00000000-0000-0000-F32A-25A5750DED12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rv45-devi~radv"><intent_id>996270</intent_id><project_id>888923</project_id><text_data>#1 Replace Kitchen hood fan. #2 Single family mobile home. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2019-08-01T00:00:00</comment_date></row><row _id="row-b4kf-e7j3~ermk" _uuid="00000000-0000-0000-B0F7-CA30D1D05C9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b4kf-e7j3~ermk"><intent_id>965126</intent_id><project_id>846230</project_id><text_data>INSTALLED INDOORS CAT 6 DATA WIRE</text_data><comment_date>2019-03-13T00:00:00</comment_date></row><row _id="row-w3u2_35up-ypjr" _uuid="00000000-0000-0000-C545-5124874B3A55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w3u2_35up-ypjr"><intent_id>985430</intent_id><project_id>884580</project_id><text_data>Remove, haul away, and replace gutters on barn</text_data><comment_date>2019-06-18T00:00:00</comment_date></row><row _id="row-fnua.pu6w.xg4p" _uuid="00000000-0000-0000-0475-1CB7FDA4789E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fnua.pu6w.xg4p"><intent_id>1276736</intent_id><project_id>1015096</project_id><text_data>#1- Task #1: Labor to set up the temporary water connection with the water district and assess the existing pipe under the home; Task #2: Return after excavation to install a new line set from under the home to supply at the best location to ensure a solid repair.#2- Single dwelling structure#3- One (1) level#4- (a) No; (b) No: (c) Yes; (d) No; (e) No; (f) No; (g) No; (h) No; (i) No; (j) No; (k) No; (l) No#5- Yes#6- Yes#7- No#8- No</text_data><comment_date>2022-10-21T00:00:00</comment_date></row><row _id="row-49bb_tc6h_8fpx" _uuid="00000000-0000-0000-E591-33295EC93BB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49bb_tc6h_8fpx"><intent_id>1183248</intent_id><project_id>971125</project_id><text_data>Installing Fresh Fine mulch by blowing into beds @ 2 or 3' depths or deeper as required, cleaning up with leaf blowers if necessary.</text_data><comment_date>2021-10-05T00:00:00</comment_date></row><row _id="row-swd4~7b4q-c9ym" _uuid="00000000-0000-0000-81FE-5A754B06833A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-swd4~7b4q-c9ym"><intent_id>534348</intent_id><project_id>695886</project_id><text_data>Site 1 - Dottie Harper Park, City of Burien - SW 146th St &amp; 4th Avenue SW, Burien, WASite 2 - Lake Grove Park - City of Federal Way - 833 SW 308th St., Federal Way, WaSite 3 - McMicken Heights Park - City of SeaTac - S. 166th St. &amp; 40th Ave., Sea Tac, WASite 4 - Sunset Playfields, City of Sea Tac - 13659 18th Ave. S., Sea Tac, WASite 5 - Cami Ditolla Childcare - 2056 S 222nd, Des Moines, WA 98198Site 6 - Mako Mohamed Childcare - 30831 20th Ave. S., Federal Way, WA 98003Site 7 - American Lake Park - City of Lakewood - 9222 Veterans Dr SW, Lakewood, WA 98498Site 8 - Kiwanis Park - City of Lakewood - 6002 Fairlawn Dr. SW, Lakewood, WA Site 9 - Juana's Childcare - 1279 S. Meyers, Tacoma, WA</text_data><comment_date>2012-09-13T00:00:00</comment_date></row><row _id="row-ihi3.n8ry_rcmq" _uuid="00000000-0000-0000-9E11-F5DBF6118C55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihi3.n8ry_rcmq"><intent_id>1019120</intent_id><project_id>898391</project_id><text_data>#1 - Install Whole House fans, Kitchen fan, electrical repairs#2 - Single Family Dwellings#3 - One or two stories#4 - (a) no#4 - (b) no#4 - (c) yes#4 - (d) no#4 - (e) no#4 - (f) no#4 - (g) no#4 - (h) no#4 - (i) no#4 - (j) no#4 - (k) no#4 - (l) n/a#5 - yes#6 - yes#7 - no#8 - no</text_data><comment_date>2019-10-31T00:00:00</comment_date></row><row _id="row-27ac.7i27_wza4" _uuid="00000000-0000-0000-D696-3A6A096FA03C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-27ac.7i27_wza4"><intent_id>788525</intent_id><project_id>802172</project_id><text_data>project is building 4 slabs at 4 radio towers. Laborer will be shoveling dirt, mixing concrete, stripping forms.</text_data><comment_date>2016-09-18T00:00:00</comment_date></row><row _id="row-hyvp_9pg3-2wsn" _uuid="00000000-0000-0000-5800-BE61D8A942DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hyvp_9pg3-2wsn"><intent_id>739243</intent_id><project_id>781534</project_id><text_data>Filed by Debra Lovely</text_data><comment_date>2015-12-28T00:00:00</comment_date></row><row _id="row-rnrd_siua-ak3u" _uuid="00000000-0000-0000-1551-6E08C5C9578B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rnrd_siua-ak3u"><intent_id>753904</intent_id><project_id>788378</project_id><text_data>PC 6  JOB # 901-39  3/3/16- 1/8/17</text_data><comment_date>2016-03-29T00:00:00</comment_date></row><row _id="row-ew6w.j67h_mhnw" _uuid="00000000-0000-0000-D2E5-A69E3A5A2FF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ew6w.j67h_mhnw"><intent_id>1283902</intent_id><project_id>1041061</project_id><text_data>INV # 89309618 SR # 51714886</text_data><comment_date>2022-11-15T00:00:00</comment_date></row><row _id="row-fs8x_6ryb-tmpu" _uuid="00000000-0000-0000-8DCF-9F11BDB68014" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fs8x_6ryb-tmpu"><intent_id>666630</intent_id><project_id>749228</project_id><text_data>Form filed by: Cedro Rodriguez</text_data><comment_date>2014-11-20T00:00:00</comment_date></row><row _id="row-4eew_z8fq.canh" _uuid="00000000-0000-0000-0837-B81E8B739025" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4eew_z8fq.canh"><intent_id>512975</intent_id><project_id>687750</project_id><text_data>no</text_data><comment_date>2012-05-22T00:00:00</comment_date></row><row _id="row-utg5.x5rp.s4fy" _uuid="00000000-0000-0000-5C45-A7DC0429AE10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utg5.x5rp.s4fy"><intent_id>979059</intent_id><project_id>875822</project_id><text_data>Oldcastle Precast believes that the work and hours described in this Intent to Pay Prevailing Wage and/or Affidavit of Wages Paid is not subject to payment of prevailing wage. Oldcastle Precast�s filing of an Intent to Pay Prevailing Wage and/or Affidavit of Wages Paid may not be construed in any manner whatsoever as an acknowledgement or agreement that the work and hours described therein are subject to payment of prevailing wage.</text_data><comment_date>2019-05-20T00:00:00</comment_date></row><row _id="row-pypy_fhjm-va25" _uuid="00000000-0000-0000-C169-4ED5181F793E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pypy_fhjm-va25"><intent_id>1065418</intent_id><project_id>922431</project_id><comment_date>2020-06-16T00:00:00</comment_date></row><row _id="row-id76-c8uu~jmsu" _uuid="00000000-0000-0000-955E-4EA795A83F86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-id76-c8uu~jmsu"><intent_id>879613</intent_id><project_id>828912</project_id><text_data>Job #F3486</text_data><comment_date>2017-12-15T00:00:00</comment_date></row><row _id="row-w39z~tgjv~p2a4" _uuid="00000000-0000-0000-1F5A-1A7A36EC6F6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w39z~tgjv~p2a4"><intent_id>1528659</intent_id><project_id>1181896</project_id><text_data>#1- install heat pump system and furnace; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2025-04-21T00:00:00</comment_date></row><row _id="row-wg5y-x52h.33fn" _uuid="00000000-0000-0000-427E-6F2EB7EE02BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wg5y-x52h.33fn"><intent_id>846005</intent_id><project_id>822807</project_id><text_data>Filed by Vadim KazakovProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with HUD Non Routine Maintenance Wage Determinations for THA requirements for the following crafts/trades/occupations.</text_data><comment_date>2017-07-07T00:00:00</comment_date></row><row _id="row-e6q5_ac25.fayk" _uuid="00000000-0000-0000-4E02-3AA2FB347769" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e6q5_ac25.fayk"><intent_id>466574</intent_id><project_id>670341</project_id><text_data>Sent e-mail: Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor).  For this Intent filing firms are to enter �Time and Materials� for  the dollar amount of the contract as an exact dollar amount cannot be identified at the time of filing. To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  When filing these forms, the dollar amount of the contract (which is the total amount that will be invoiced), including tax, will be entered on the form along with a short explanation in the notes section about the nature of the work so that the project can be tracked by the awarding agency and L&amp;I. In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures.  Please note that an on-call/blanket/annual contract may not be utilized for construction projects or for warranty work as these require their own set of Intent and Affidavit forms with the appropriate bid and award dates associated with those specific contracts.  The use of on-call/blanket/annual contracts is limited to minor maintenance and repair work.  If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work.On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out.  This form filing requirement also applies to owner/operators.  Please follow this filing method on any future contracts covered under this policy.  (RCW 39.12.040)We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.  A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.aspIf you have any questions, please contact me.</text_data><comment_date>2012-05-14T00:00:00</comment_date></row><row _id="row-z3kf-m7p4_npva" _uuid="00000000-0000-0000-A075-CEDE04B643CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3kf-m7p4_npva"><intent_id>522250</intent_id><project_id>691586</project_id><text_data>Form filed by: Robert Anderson - petu235Trade: Landscape Construction. Job classification: Landscaping or planting laborers &amp;quot;EarthCorps' work on this project is for environmental and trail maintenance work performed by conservation corps members exempt from payment of prevailing wage rates pursuant to SB 5538&amp;quot;.  SEE ATTACHED:EarthCorpsLetter of Intent Addendum - Exemption QuestionsDate: July 5, 20121To: Washignton Department of Labor &amp; IndustriesFrom: Rob Anderson, Senior Project ManagerProject Name/Location: Schrier Property - Yellow Iris Control and Maintenance   1) What is the purpose of this project?   EarthCorps' conservation corps crews will be conducting environmental work.   2) Does this project entail the remodeling or new construction of a facility?   No.   3) What specific tasks did your employees perform?   EarthCorps' conservation corps crews will control invasive plants in preparation for native planting and/or natural regeneration by cutting and grubbing the invasive plant and moving by hand the plant material to onsite compost piles and/or roadside pile. In addition, Conservation corps crews will control invasive plants in preparatuin fir natuve okantung and/or natural regeneration by applying herbicide (using stem injection or hand operated spray tools) on the invasive plant.   4) What, if any, tools did your employees use in the performance of those tasks?   EarthCorps' cinservatuin ciros crews will use hand tools including hand pruners, hand tillers, loppers, shovels, picks, weed wrenches, hand saws and rakes.  In addition, EarthCorps' conservation corps crews will use hand operated spray and stem injection tools.   5) If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks?   no.</text_data><comment_date>2012-07-13T00:00:00</comment_date></row><row _id="row-366a_uhax_pskd" _uuid="00000000-0000-0000-6563-E66A6E0531ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-366a_uhax_pskd"><intent_id>952494</intent_id><project_id>840001</project_id><text_data>Project is exempt from State Prevailing Wage Rates based on the Housing Act of 1937 &amp; 24 CFR 965.101. All workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades/occupations</text_data><comment_date>2018-12-27T00:00:00</comment_date></row><row _id="row-2sbg~n79q~jhyq" _uuid="00000000-0000-0000-8ABC-BBDDDA342598" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2sbg~n79q~jhyq"><intent_id>812173</intent_id><project_id>806463</project_id><text_data>JCI Project Number 7N59-0035</text_data><comment_date>2017-01-20T00:00:00</comment_date></row><row _id="row-cni5.tydk.2n9p" _uuid="00000000-0000-0000-2088-A19017631A89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cni5.tydk.2n9p"><intent_id>772458</intent_id><project_id>796064</project_id><text_data>sr35409256</text_data><comment_date>2016-07-05T00:00:00</comment_date></row><row _id="row-xhg8.gcfm~g2kw" _uuid="00000000-0000-0000-BD10-34795A23F45E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xhg8.gcfm~g2kw"><intent_id>816188</intent_id><project_id>813575</project_id><text_data>Fringe breakdown provided per correction notice received 2/24/2017; Total = $22.39 per hour. (Pension = $7.54, Health = $12.28, PTO/Vacation = $1.01, Holiday = $0.65, Apprentice Training Prog = $0.92.)</text_data><comment_date>2017-02-27T00:00:00</comment_date></row><row _id="row-2p5a.xpi9_raeu" _uuid="00000000-0000-0000-C8FB-452736BD611E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2p5a.xpi9_raeu"><intent_id>1097917</intent_id><project_id>932675</project_id><text_data>Pre School Portable - Concrete, Fence and Sod</text_data><comment_date>2020-10-22T00:00:00</comment_date></row><row _id="row-nb9q~wmxc~2mt4" _uuid="00000000-0000-0000-C32E-74CEB18E03CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nb9q~wmxc~2mt4"><intent_id>1086909</intent_id><project_id>901757</project_id><text_data>Other Trucks - Oil Distributor and Water Truck</text_data><comment_date>2020-09-10T00:00:00</comment_date></row><row _id="row-6nqx~v3sp~9eaz" _uuid="00000000-0000-0000-F4AE-7156163F226C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6nqx~v3sp~9eaz"><intent_id>911096</intent_id><project_id>853325</project_id><text_data>There are six different site addresses, 2-Everett , 2-Marysville, 1-Edmonds, 1-Lynnwood. But all are in Snohomish county1) we are doing exterior paint for these sites2) &amp; 3)Edmonds site- 1 story Group Home Facility, 2-Everett, 2-Marysville, 1-Lynnwood are 2 story duplex family dwelling4)No commercial or retail use, used as multi family dwelling 5) Yes6) Yes7) No8) No</text_data><comment_date>2018-06-13T00:00:00</comment_date></row><row _id="row-pr4t_emzm-85na" _uuid="00000000-0000-0000-E00B-DA328F0B9D89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pr4t_emzm-85na"><intent_id>616279</intent_id><project_id>663543</project_id><text_data>Revised intent</text_data><comment_date>2014-02-13T00:00:00</comment_date></row><row _id="row-hjk7~36ph-he2d" _uuid="00000000-0000-0000-DCB9-8CD51B160BDB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjk7~36ph-he2d"><intent_id>748593</intent_id><project_id>785966</project_id><text_data>1) Electric Furnace Repair2) Single Family Dwelling3) 14) a,b:NO4) c: YES4) d,e,f,g,h,i,j,k: NO5) YES6) YES7) NO8) NO</text_data><comment_date>2016-02-25T00:00:00</comment_date></row><row _id="row-aiit.finn~44k7" _uuid="00000000-0000-0000-4F59-5E3F636AA78B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aiit.finn~44k7"><intent_id>1174643</intent_id><project_id>974722</project_id><text_data>General Labrorer job code was the best fit for work performed by non-apperentice, non-Inside wireman (journey-level.) Tasks include roof mount equipment (rails) installation, solar panel handling and placement, with the use of various hand tools. Other tasks include job site stadging/set-up and cleanup.</text_data><comment_date>2022-07-14T00:00:00</comment_date></row><row _id="row-p558_4epb~pjcw" _uuid="00000000-0000-0000-0F73-2A1EB6DAC3C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p558_4epb~pjcw"><intent_id>629813</intent_id><project_id>728335</project_id><text_data>************************************$39.82 WAS PAID AS WAGES</text_data><comment_date>2014-08-20T00:00:00</comment_date></row><row _id="row-a8f5.r6ye~e65p" _uuid="00000000-0000-0000-9020-13167FB16E05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a8f5.r6ye~e65p"><intent_id>1046645</intent_id><project_id>882519</project_id><text_data>Trucking; Hauling of materials</text_data><comment_date>2020-03-19T00:00:00</comment_date></row><row _id="row-8zd2.nrmc-im2w" _uuid="00000000-0000-0000-9DDB-9D82E9C3BB2F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zd2.nrmc-im2w"><intent_id>723003</intent_id><project_id>727008</project_id><text_data>Filed by Crystal Buchholz.</text_data><comment_date>2015-09-25T00:00:00</comment_date></row><row _id="row-hxge-p3ew-tszk" _uuid="00000000-0000-0000-2BDC-657E708D8E46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxge-p3ew-tszk"><intent_id>1216887</intent_id><project_id>1002970</project_id><text_data>WO# N97465</text_data><comment_date>2022-03-10T00:00:00</comment_date></row><row _id="row-pv93.skcg_p8rg" _uuid="00000000-0000-0000-993B-E869260A71FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pv93.skcg_p8rg"><intent_id>1036641</intent_id><project_id>907403</project_id><text_data>Maintenance of existing landscape areas. Tasks: lawn mowing/edging, plant bed debris clean up, shrub pruning, weed removal, raking, and leaf removal. Tools: gas powered lawn mowers 5 &amp; 11 hp, gas powered edgers, 2 cycle hand held line trimmers, 2 cycle leaf blowers, 2 cycle hedge shears, hand pruners, loppers and rakes</text_data><comment_date>2020-02-06T00:00:00</comment_date></row><row _id="row-gbf9~fmvm-8qhs" _uuid="00000000-0000-0000-901A-78528A363FF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbf9~fmvm-8qhs"><intent_id>994479</intent_id><project_id>888241</project_id><text_data>WRS Job #P19-236PW</text_data><comment_date>2019-07-24T00:00:00</comment_date></row><row _id="row-duz3~fegj_kfm8" _uuid="00000000-0000-0000-583E-8F008449E00E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-duz3~fegj_kfm8"><intent_id>941558</intent_id><project_id>864761</project_id><text_data>Other truck are our water trucks</text_data><comment_date>2019-01-17T00:00:00</comment_date></row><row _id="row-bkp7.xkkh-aish" _uuid="00000000-0000-0000-0D88-6C9229791C02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bkp7.xkkh-aish"><intent_id>1139913</intent_id><project_id>959837</project_id><text_data>5/6/2021: Technician arrived on site evaluated the unit. Technician found there was power from the motor starter to the motor, but the motor would not run. Technician determined that the motor/pump assembly will need to be replaced. SWS Equipment to provide quote for recommended repair.</text_data><comment_date>2021-06-01T00:00:00</comment_date></row><row _id="row-mb7z~4fxg.ape4" _uuid="00000000-0000-0000-1CA7-FC96FB2570BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mb7z~4fxg.ape4"><intent_id>924390</intent_id><project_id>852261</project_id><text_data>Contractors notes: 1) Fire Restoration 2) Apartment Building 3) 2 4) (a) no (b) no (c) yes (d) no (e) no (f) no (g) no (h) no (I) no (j) no (k) no 5) yes 6) yes 7) yes 8) yes</text_data><comment_date>2018-08-09T00:00:00</comment_date></row><row _id="row-k96t-dt5e.b2yx" _uuid="00000000-0000-0000-E92B-AB8543BC50CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k96t-dt5e.b2yx"><intent_id>1528698</intent_id><project_id>1168462</project_id><text_data>9957002 - Apprentice utilization not required.</text_data><comment_date>2025-04-21T00:00:00</comment_date></row><row _id="row-5sgn-uav5-2pud" _uuid="00000000-0000-0000-8031-3589715B259C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5sgn-uav5-2pud"><intent_id>1135224</intent_id><project_id>957847</project_id><text_data>? Provide services to audit and test fiber for Sound Transit OMF building.? Trace and document damaged fiber in specified rack at OMF.? Determine fiber locations.? Determine type of fiber.? Determine the length of each fiber.? Provide additional fiber with customer�s direction.? Create and implement a labeling scheme that is compliant to EIA/TIA 606 and per customer�s approval.? Test fiber connections to make sure systems are in working order.</text_data><comment_date>2021-04-12T00:00:00</comment_date></row><row _id="row-mhvj.x6d5_ix34" _uuid="00000000-0000-0000-D138-2218C2110CCF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mhvj.x6d5_ix34"><intent_id>635989</intent_id><project_id>737445</project_id><text_data>#1 Removal of furnace and installation of forced air heat pump. #2 Yes #3</text_data><comment_date>2014-06-18T00:00:00</comment_date></row><row _id="row-8vc8~ea2b~f5q9" _uuid="00000000-0000-0000-35EE-48F307493B62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8vc8~ea2b~f5q9"><intent_id>895810</intent_id><project_id>847132</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2018-03-30T00:00:00</comment_date></row><row _id="row-99c3.2g8y~6vu6" _uuid="00000000-0000-0000-D40F-0E47ABBE469C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-99c3.2g8y~6vu6"><intent_id>825261</intent_id><project_id>792309</project_id><text_data>We are a staffing company. Provide and install cat 6 cabling for voice (phones) and data (computers). Terminate, test and label. Cabling will be run indoors.</text_data><comment_date>2017-04-07T00:00:00</comment_date></row><row _id="row-npat.u6zu-92y4" _uuid="00000000-0000-0000-00EF-C95BAAF61A54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-npat.u6zu-92y4"><intent_id>652726</intent_id><project_id>738976</project_id><text_data>Track Surfacing and Striping and installation of the base E-Layer using a paving machine, for the synthetic turf to be applied to on the football field.</text_data><comment_date>2014-09-08T00:00:00</comment_date></row><row _id="row-u2qw-2nsx.uht2" _uuid="00000000-0000-0000-CABE-9351CADAEAC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u2qw-2nsx.uht2"><intent_id>677822</intent_id><project_id>754809</project_id><text_data>1. Electrical remodel   2. Yes    3. 1 or 2    4. SFR   A. no  B. no   C. yes   D-F. no   5. yes   6. yes   7. no   8. no</text_data><comment_date>2015-02-04T00:00:00</comment_date></row><row _id="row-2awr.3nq4~86kr" _uuid="00000000-0000-0000-B5CD-59E0DFA35D3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2awr.3nq4~86kr"><intent_id>478511</intent_id><project_id>670309</project_id><text_data>we worked on fire alarm, intercom and tv</text_data><comment_date>2011-10-12T00:00:00</comment_date></row><row _id="row-vkuk~p8vw.g6cy" _uuid="00000000-0000-0000-BBBD-11DE6318B22D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkuk~p8vw.g6cy"><intent_id>489698</intent_id><project_id>676248</project_id><text_data>Scope of work to include installation of underground sprinkler system; place topsoil; plant trees, shrubs and groundcover; place mulch; place landscape boulders; hydroseed.  Equipment to be used includes Mini Excavator 40hp; Skid Steer Loader 47hp; Backhoe 89hp.</text_data><comment_date>2011-11-17T00:00:00</comment_date></row><row _id="row-ytk3~7ucc-67zx" _uuid="00000000-0000-0000-33D2-F8A34BDFDCA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ytk3~7ucc-67zx"><intent_id>744909</intent_id><project_id>784271</project_id><text_data>Job # 8003718</text_data><comment_date>2016-02-03T00:00:00</comment_date></row><row _id="row-sdhp-ntpy_343p" _uuid="00000000-0000-0000-81D4-DD2D190FE22E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sdhp-ntpy_343p"><intent_id>569796</intent_id><project_id>711081</project_id><text_data>We will be using a Ford F250 pickup truck, owned by Quiring Monuments, Inc. to drop off materials (granite) to our subcontractor.</text_data><comment_date>2013-07-26T00:00:00</comment_date></row><row _id="row-d3sz-u3hp_c5da" _uuid="00000000-0000-0000-DEB5-B9A070C52F12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d3sz-u3hp_c5da"><intent_id>816939</intent_id><project_id>808654</project_id><text_data>Other truck is a 2007 Sterling Box Van, GWT of 16,000 pounds, for delivery of manufactured materials to jobsite.Work performed is offsite manufacturing in our Tacoma facility.</text_data><comment_date>2017-02-21T00:00:00</comment_date></row><row _id="row-f2qy-hzbe~qti2" _uuid="00000000-0000-0000-80EB-630C7F0F0EDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f2qy-hzbe~qti2"><intent_id>685679</intent_id><project_id>758448</project_id><text_data>Score of Work:The project consists of upgrades to the existing aeration equipment at the King County�s South Treatment Plant.  Upgrades include demolition and replacement of existing aeration equipment across four basins. McClure and Sons intends to self perform the entire scope of work.General Laborer:General laborers will be responsible for; the demolition of existing membrane equipment, staging of materials and equipment, as well as physical site cleanup and waste disposal. Tools used by the general labor will include; various hand tools, wheel barrows and pallet jacks for transferring of materials, and brooms for cleanup.Millwright: Millwrights will assemble, align, and install new membrane equipment and fasten them into place.Tools used by the millwright will include all hand tools or power tools required to assemble and fasten new membrane equipment. Power Equipment Operator:Power equipment operators will operate a forklift on site.  The forklift operators will load and unload trucks as needed, as well as load waste into dumpsters.</text_data><comment_date>2015-04-09T00:00:00</comment_date></row><row _id="row-cd48_r7y9_bbse" _uuid="00000000-0000-0000-CB5B-D3FA8026BE95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cd48_r7y9_bbse"><intent_id>936798</intent_id><project_id>846743</project_id><text_data>Only Oregon Employees: SAIF 811528</text_data><comment_date>2018-10-01T00:00:00</comment_date></row><row _id="row-raz8.amun~b7qa" _uuid="00000000-0000-0000-F048-66EA80BEA030" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-raz8.amun~b7qa"><intent_id>670602</intent_id><project_id>751123</project_id><text_data>This contract is for Landscape Maintenance at multiple sites in the city of Bellevue. This project to consist of mowing, trimming, edging, bed care, pruning &amp; leaf fall removal on the sites. Equipment to be used includes walk behind lawnmowers, weed eaters, pruning shears, back pack blowers(for cleanup), rakes, shovels, buckets &amp; hoes as required to complete the maintenance of the established planting &amp; turf areas for these City of Bellevue sites.This service is on a set schedule weekly from March 1 through October 31 and bi-weekly for the months of January &amp; February/November &amp; December.</text_data><comment_date>2014-12-18T00:00:00</comment_date></row><row _id="row-66g4~4shn-gmwh" _uuid="00000000-0000-0000-8B43-9B78D74CB6F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-66g4~4shn-gmwh"><intent_id>479977</intent_id><project_id>671095</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2011-09-23T00:00:00</comment_date></row><row _id="row-dfsw-tq3z.g87a" _uuid="00000000-0000-0000-52AD-3549F29CFA1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfsw-tq3z.g87a"><intent_id>582115</intent_id><project_id>712248</project_id><text_data>Form filed by: Carl Poortinga Jr.</text_data><comment_date>2013-07-18T00:00:00</comment_date></row><row _id="row-qmn3_waex_c5iy" _uuid="00000000-0000-0000-DD1F-3A5465F7126E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qmn3_waex_c5iy"><intent_id>588105</intent_id><project_id>717009</project_id><text_data>Filed by Brian L Perleberg</text_data><comment_date>2013-08-16T00:00:00</comment_date></row><row _id="row-k7fd-2mkc-5qj9" _uuid="00000000-0000-0000-CA29-3D31F501381B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7fd-2mkc-5qj9"><intent_id>1160284</intent_id><project_id>970654</project_id><text_data>Project# 03273, Fukuara, Nemel, 2027 E Mallon Ave, Spokane, WA 99202</text_data><comment_date>2021-08-12T00:00:00</comment_date></row><row _id="row-nftr_739d_bsrh" _uuid="00000000-0000-0000-9979-84C1708A9ACA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nftr_739d_bsrh"><intent_id>488404</intent_id><project_id>677920</project_id><text_data>Jean Erecca-The Garden Plumber (sub contractor)License# GARDEP*912NS, UBI# 602900198</text_data><comment_date>2011-11-09T00:00:00</comment_date></row><row _id="row-3e8b.q964_jc3c" _uuid="00000000-0000-0000-BCFA-29A1C7B2D405" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3e8b.q964_jc3c"><intent_id>464112</intent_id><project_id>662474</project_id><text_data>Truck Driver: Driver that drives truck to job site with hollow metal frames</text_data><comment_date>2011-07-05T00:00:00</comment_date></row><row _id="row-67v9-wfjr.y6ea" _uuid="00000000-0000-0000-0B16-3BFB6D5BAB84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-67v9-wfjr.y6ea"><intent_id>1006265</intent_id><project_id>890958</project_id><text_data>112th Ave. S.E.,Kent, WA 980301.Wall Blow 2. Multi family 3. 2 4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No 5. Yes 6. Yes 7. Yes 8. No</text_data><comment_date>2019-09-11T00:00:00</comment_date></row><row _id="row-ad46_t2md-jhca" _uuid="00000000-0000-0000-F481-B8BE5D672DC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ad46_t2md-jhca"><intent_id>1336408</intent_id><project_id>1073011</project_id><text_data>Haz Waste Labor to remove all debris using shovel/rakeDump Truck &amp; Trailer to haul equipment and any loose materialsBackhoe to dig around area to see where seep is coming from</text_data><comment_date>2023-06-14T00:00:00</comment_date></row><row _id="row-fgzi.66qh.txbx" _uuid="00000000-0000-0000-281B-5CE70844C9BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fgzi.66qh.txbx"><intent_id>1214094</intent_id><project_id>1001118</project_id><text_data>elect tech(06)install new cat6 workstation drops for the BLEA deptinside work</text_data><comment_date>2022-02-25T00:00:00</comment_date></row><row _id="row-jkuz.bj77~ata7" _uuid="00000000-0000-0000-9F29-8AFB56C6161A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jkuz.bj77~ata7"><intent_id>550059</intent_id><project_id>699620</project_id><text_data>Koshinz 2011 36th St 98229</text_data><comment_date>2012-12-28T00:00:00</comment_date></row><row _id="row-t5tr.sxt4.p287" _uuid="00000000-0000-0000-6B39-F9DBC0DF527F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t5tr.sxt4.p287"><intent_id>567550</intent_id><project_id>710134</project_id><text_data>Flohawks - Big Job number</text_data><comment_date>2013-05-02T00:00:00</comment_date></row><row _id="row-agrh.ugha-ucyv" _uuid="00000000-0000-0000-80F7-B5583AF50344" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-agrh.ugha-ucyv"><intent_id>851006</intent_id><project_id>828517</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-07-28T00:00:00</comment_date></row><row _id="row-2qwu_unpc.jbfb" _uuid="00000000-0000-0000-7C90-38020C1AF1E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2qwu_unpc.jbfb"><intent_id>1191313</intent_id><project_id>986883</project_id><text_data>12442 2021 agreement</text_data><comment_date>2021-11-05T00:00:00</comment_date></row><row _id="row-ccak~96ee_yvqc" _uuid="00000000-0000-0000-0C3A-4162D69CF91A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ccak~96ee_yvqc"><intent_id>1215300</intent_id><project_id>874199</project_id><text_data>we had 2 employees work for 3 hours each on temp tape. no tools or equipment.</text_data><comment_date>2022-03-25T00:00:00</comment_date></row><row _id="row-zjtt.jziv-mesa" _uuid="00000000-0000-0000-8C5D-7FB749E74264" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zjtt.jziv-mesa"><intent_id>1238953</intent_id><project_id>1016309</project_id><text_data>9894309</text_data><comment_date>2022-06-06T00:00:00</comment_date></row><row _id="row-r9ci-v7i2-c5d3" _uuid="00000000-0000-0000-0507-F5DD6D7781C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9ci-v7i2-c5d3"><intent_id>885206</intent_id><project_id>842276</project_id><text_data>LAN(Local Area Network)inside workprovide labor to add data drops for new work stationselectronic tech(06)</text_data><comment_date>2018-01-25T00:00:00</comment_date></row><row _id="row-x7ep~a5t9~3qci" _uuid="00000000-0000-0000-48BD-C1ED65DDC3F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x7ep~a5t9~3qci"><intent_id>907141</intent_id><project_id>851773</project_id><text_data>Remove and replace gutter system on Bellefield Yard maintenance building.</text_data><comment_date>2018-05-25T00:00:00</comment_date></row><row _id="row-b9me-86c7_a44p" _uuid="00000000-0000-0000-A021-2EB8B3E4611C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9me-86c7_a44p"><intent_id>855651</intent_id><project_id>830269</project_id><text_data>Installation of Cat. 6 Data cable to new locations, termination and testing</text_data><comment_date>2017-08-17T00:00:00</comment_date></row><row _id="row-82jw.smrq.7ri2" _uuid="00000000-0000-0000-CA98-268025B29CA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-82jw.smrq.7ri2"><intent_id>718462</intent_id><project_id>771436</project_id><text_data>Removal tree near power lines</text_data><comment_date>2015-09-02T00:00:00</comment_date></row><row _id="row-uqhw.ptqm-fr29" _uuid="00000000-0000-0000-EB4D-673E51597D1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uqhw.ptqm-fr29"><intent_id>703158</intent_id><project_id>763866</project_id><text_data>Truck is an F150 used to transport equipment and materials to and from the job site</text_data><comment_date>2015-06-24T00:00:00</comment_date></row><row _id="row-6u3x_2aqj_5979" _uuid="00000000-0000-0000-CC0D-D37FAFCBE2BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6u3x_2aqj_5979"><intent_id>839101</intent_id><project_id>822358</project_id><text_data>Semi End Dump with 30 yard concrete trailer</text_data><comment_date>2017-06-07T00:00:00</comment_date></row><row _id="row-ajnp.4tpm.k9r4" _uuid="00000000-0000-0000-08CD-ACBE6CAF8BA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ajnp.4tpm.k9r4"><intent_id>1226525</intent_id><project_id>1009090</project_id><text_data>9882679</text_data><comment_date>2022-04-19T00:00:00</comment_date></row><row _id="row-9xhe-vwb7.87g5" _uuid="00000000-0000-0000-382B-9AAF795AC8B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9xhe-vwb7.87g5"><intent_id>801758</intent_id><project_id>794110</project_id><text_data>WO#525202</text_data><comment_date>2016-11-16T00:00:00</comment_date></row><row _id="row-uzvw.aih3-ckvr" _uuid="00000000-0000-0000-1D90-8AACA625F44D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzvw.aih3-ckvr"><intent_id>887746</intent_id><project_id>843439</project_id><text_data>Clean homeless camp inside above ground electrical vaultHaz Waste workers to clean homeless camp using shovels/rakes/brooms</text_data><comment_date>2018-02-12T00:00:00</comment_date></row><row _id="row-aaau_vqmk-tamt" _uuid="00000000-0000-0000-246E-E29567BD8E3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aaau_vqmk-tamt"><intent_id>1010992</intent_id><project_id>894789</project_id><text_data>Work being performed, directly from the City provided SOW:  The WORK to be completed under the Contract consists of landscape construction to include temporary traffic control, clearing and grubbing, removal of marked trees that are dead or damaged, tree trimming, removal and disposal of all grubbed materials, purchase, delivery, and placement of weed barrier, bark mulch, and Montana rainbow river rock mulch.</text_data><comment_date>2019-10-28T00:00:00</comment_date></row><row _id="row-837v.ruyd~d85c" _uuid="00000000-0000-0000-751E-177F7737D5B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-837v.ruyd~d85c"><intent_id>813980</intent_id><project_id>812558</project_id><text_data>302409</text_data><comment_date>2017-02-01T00:00:00</comment_date></row><row _id="row-xghg_t5z7~imys" _uuid="00000000-0000-0000-C56C-7FFF947E83DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xghg_t5z7~imys"><intent_id>613040</intent_id><project_id>719425</project_id><text_data>1617 w. Lincoln ave Yakima,wa 98902 1. install bath fan 2. single family house 3. single level 4. no to a thru k 5. no 6. no 7. no 8. no</text_data><comment_date>2014-01-21T00:00:00</comment_date></row><row _id="row-2c9p_8i2g.derx" _uuid="00000000-0000-0000-D945-3F5086DCFE15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2c9p_8i2g.derx"><intent_id>889613</intent_id><project_id>843253</project_id><text_data>Vegetation Management along Sounder Transit tracks in Seattle, WA.</text_data><comment_date>2018-02-22T00:00:00</comment_date></row><row _id="row-zr6x-a7g8-5dv2" _uuid="00000000-0000-0000-C488-89B4AE985C6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zr6x-a7g8-5dv2"><intent_id>1057140</intent_id><project_id>918574</project_id><text_data>The Truck Driver will deliver equipment and materials from T BAILEY's shop in Anacortes, WA to the jobsite in Puyallup. He drives an International 9400I tractor and will pull various trailers depending on what is being delivered.</text_data><comment_date>2020-05-18T00:00:00</comment_date></row><row _id="row-3vtc_y72x_c6js" _uuid="00000000-0000-0000-B4B2-A4557127BBAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vtc_y72x_c6js"><intent_id>831381</intent_id><project_id>819404</project_id><text_data>GU Job #17094Truck Driver: Water Tank Truck (0-3000) gallons. Purpose: Dust control.Truck Driver: Lowboy to transport equipment to job site.</text_data><comment_date>2017-05-05T00:00:00</comment_date></row><row _id="row-u2v9-wqpa-amzh" _uuid="00000000-0000-0000-4FBA-2AD3A4ED9C92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u2v9-wqpa-amzh"><intent_id>570576</intent_id><project_id>711420</project_id><text_data>Form filed by: Andy Vallejo</text_data><comment_date>2013-05-20T00:00:00</comment_date></row><row _id="row-ingw_hxhx_9aab" _uuid="00000000-0000-0000-8CE7-FD35C7A86C08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ingw_hxhx_9aab"><intent_id>1119312</intent_id><project_id>948828</project_id><text_data>3801 Brooklyn Ave NE,Seattle WA 98105It's a 4 story building w/ a parking garage (5 stories with parking garage)- - - - -Regarding the wage, this was an emergency call ON Christmas.  That was one of the contributing factors to the price charged.  Sorry for not mentioning that!</text_data><comment_date>2021-02-17T00:00:00</comment_date></row><row _id="row-ikhz~wjpm_rtfj" _uuid="00000000-0000-0000-3905-6B2BE4DD1A1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ikhz~wjpm_rtfj"><intent_id>737635</intent_id><project_id>780758</project_id><text_data>Filed by Jim Campbell</text_data><comment_date>2015-12-15T00:00:00</comment_date></row><row _id="row-vcv6_xndj.anxt" _uuid="00000000-0000-0000-817F-8F9726FF75B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vcv6_xndj.anxt"><intent_id>858319</intent_id><project_id>826463</project_id><text_data>1170072</text_data><comment_date>2017-08-24T00:00:00</comment_date></row><row _id="row-d5tj-gu4a_sza3" _uuid="00000000-0000-0000-1228-94C1DF61D0C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d5tj-gu4a_sza3"><intent_id>607992</intent_id><project_id>715614</project_id><text_data>Truck is a 3000 gal truck mounted hydroseeder</text_data><comment_date>2013-12-11T00:00:00</comment_date></row><row _id="row-4suw.zrtq.ign8" _uuid="00000000-0000-0000-5141-C21CEC442514" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4suw.zrtq.ign8"><intent_id>691271</intent_id><project_id>760880</project_id><text_data>Filed by Chuck Pilou</text_data><comment_date>2015-04-28T00:00:00</comment_date></row><row _id="row-2fbf_7uu5.i9ta" _uuid="00000000-0000-0000-FAC4-3112016B6BFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2fbf_7uu5.i9ta"><intent_id>967636</intent_id><project_id>876578</project_id><text_data>1. Hook up Ductless Heat Pump. 2. Mobile Home. 3.single level. 4 A. No B. No C. Yes D. No E. No F. No G. No H. No I. No J. No K. No L. ? 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2019-03-26T00:00:00</comment_date></row><row _id="row-shwb~bqif-f2c5" _uuid="00000000-0000-0000-8C2A-8019511314EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-shwb~bqif-f2c5"><intent_id>1141422</intent_id><project_id>960623</project_id><text_data>Sunnyside Ave N, Seattle, WA 981331. Air seal, attic blow, wall blow, and mechanical ventilation    2. Single family      3. 1      4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No     5. Yes      6. Yes      7. No      8. No</text_data><comment_date>2021-05-03T00:00:00</comment_date></row><row _id="row-iwfm_asdj-g6n5" _uuid="00000000-0000-0000-57EC-D38E8165AE01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iwfm_asdj-g6n5"><intent_id>530250</intent_id><project_id>694454</project_id><text_data>Install sod in city park. Area prepped by city. Sod supplied by city. Our work only involved laying the sod.</text_data><comment_date>2012-08-23T00:00:00</comment_date></row><row _id="row-u37e-fn4y.xzgs" _uuid="00000000-0000-0000-5639-120AD73AFF6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u37e-fn4y.xzgs"><intent_id>600642</intent_id><project_id>722461</project_id><text_data>Break up and excavate contrete pad, load out and dump</text_data><comment_date>2013-10-22T00:00:00</comment_date></row><row _id="row-pqwa_4djm_55ry" _uuid="00000000-0000-0000-6B1B-3F483D674D60" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqwa_4djm_55ry"><intent_id>469635</intent_id><project_id>640783</project_id><text_data>work performed by subcontractor</text_data><comment_date>2011-11-29T00:00:00</comment_date></row><row _id="row-hanu_qpis~2frv" _uuid="00000000-0000-0000-ABBC-5EDB78B6E088" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hanu_qpis~2frv"><intent_id>925956</intent_id><project_id>857480</project_id><text_data>2180155 - Main Building Modernization</text_data><comment_date>2018-08-15T00:00:00</comment_date></row><row _id="row-scyr.vp37_fgy6" _uuid="00000000-0000-0000-952D-6FF11F7CD76E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-scyr.vp37_fgy6"><intent_id>1317214</intent_id><project_id>1061891</project_id><text_data>This is a landscape maintenance contract for the City of Bellevue, in King County for various park sites.  Work will begin 4/1/2023 and will continue until 12/31/2023 with renewal options.  Work will include mowing, trimming, edging, weeding, leaf fall and trash removal, minor irrigation repairs to existing systems, pruning and blowing of hard surfaces all on existing bed and turf areas.  Equipment to be used will consist of mowers, line trimmers, edgers, backpack blowers, and various hand tools such as rakes, shovels, hoes, hand pruners and buckets.</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-veka.3umi-tuy9" _uuid="00000000-0000-0000-288F-41711BF4CB18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-veka.3umi-tuy9"><intent_id>1001695</intent_id><project_id>891074</project_id><text_data>#1 re-roof #2 single family #3 one,#4-residence, a- no, b- no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, j-no, k-no, i-no, #5-yes, #6-yes, #7-no, #8-no</text_data><comment_date>2019-08-22T00:00:00</comment_date></row><row _id="row-8ung_qfnk~a6xy" _uuid="00000000-0000-0000-DC3A-A285A0442EE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ung_qfnk~a6xy"><intent_id>1157703</intent_id><project_id>966096</project_id><text_data>Lakeside job# 0621024TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2021-07-02T00:00:00</comment_date></row><row _id="row-vug7.mbes~3cxt" _uuid="00000000-0000-0000-B272-6D3BCBA14186" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vug7.mbes~3cxt"><intent_id>1310894</intent_id><project_id>1057976</project_id><text_data>Project# 04236, Verley, Vernetta, 19625 E Wellesley Ave, Lot 22, Spokane Valley, WA 99027</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-6y7m~5qf5~hs9u" _uuid="00000000-0000-0000-98E9-98FBD26B0EEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6y7m~5qf5~hs9u"><intent_id>1078077</intent_id><project_id>928072</project_id><text_data>Designing, installing, servicing or repairing underground lawn or landscape sprinkler systems to a maximum depth of three feet below finish grade.We will be installing new sprinkler heads and sprinkler valves.Spreading top soil to a maximum depth of six inches below finish grade. (top dressing trenches only). We will be using a Bobcat under 90 horsepower.Trenching to a maximum depth of three feet below finish grade. We will be using a mini excavator and/or trencher with both being under 90 horsepower.Hand tools we will be using consist of round &amp; square point shovels, trenching shovels, garden rakes, hand saws and a hand push fertilizer/grass seed spreader.Hauling top soil and other landscape materials in trucks with only one rear axle.** We do not have a set list of employees that will be working on this project yet. I have entered (0) for Fringe but we will be reporting these benefits on our Certified Payroll Reports. Our usual average depending on employee is $2.00 to $3.00 an hour.</text_data><comment_date>2020-08-05T00:00:00</comment_date></row><row _id="row-5i2r~6am5-pr3i" _uuid="00000000-0000-0000-ECE3-CEA3387B53D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5i2r~6am5-pr3i"><intent_id>479388</intent_id><project_id>602487</project_id><text_data>Miles Resources/dba Woodworth Job # 10131Trucking &amp; Services: Owner/Operator</text_data><comment_date>2011-09-21T00:00:00</comment_date></row><row _id="row-8xts-dcna_atq2" _uuid="00000000-0000-0000-C4FE-3F20D6D05BB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8xts-dcna_atq2"><intent_id>721125</intent_id><project_id>772545</project_id><text_data>City of Bellevue JOC Contract 1550258-000</text_data><comment_date>2015-09-16T00:00:00</comment_date></row><row _id="row-59ks.gqiy~njdb" _uuid="00000000-0000-0000-E212-F52F8F886BAF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-59ks.gqiy~njdb"><intent_id>1466049</intent_id><project_id>1019928</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site. General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2024-09-12T00:00:00</comment_date></row><row _id="row-g24r_cxyf~a57t" _uuid="00000000-0000-0000-E35A-31169115C60B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g24r_cxyf~a57t"><intent_id>1509131</intent_id><project_id>1170177</project_id><text_data>Fridge    NW PENSION          11.50    LOCAL APPR            1.10    HEALTH CARE / VEB          12.78    ORG TRUST            1.25    IND FUND            0.65    NATL PENSION            4.24    ITI/NEMI/SMOHI            0.17    EXTENDED            0.68    401K            0.79    Veba            1.03    RSF            0.15    Snap            0.07         TOTAL          34.41            BT Journeyman</text_data><comment_date>2025-02-12T00:00:00</comment_date></row><row _id="row-6y5r_74u4.hjeg" _uuid="00000000-0000-0000-BDD5-96D0F98EEFF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6y5r_74u4.hjeg"><intent_id>1509693</intent_id><project_id>1170533</project_id><text_data>gas furnace annual service</text_data><comment_date>2025-02-13T00:00:00</comment_date></row><row _id="row-jph8~tck3_hxee" _uuid="00000000-0000-0000-2B5D-E7144E8B7082" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jph8~tck3_hxee"><intent_id>1509505</intent_id><project_id>1170418</project_id><text_data>SC250116-0201</text_data><comment_date>2025-02-13T00:00:00</comment_date></row><row _id="row-brnu.g5zs_ayqz" _uuid="00000000-0000-0000-835A-3B38AE15B600" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brnu.g5zs_ayqz"><intent_id>817174</intent_id><project_id>813992</project_id><text_data>All answers are to the best of our knowledge - Please confirm with KCHA. #1 - Describe the work that your firm was contracted to perform. -Scope 1) Paint Fascia, Frame in Fascia. Scope 2 )Demo existing roof and other rooten material Scope 3)Apply new roof#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? - Per KCHA Apartment single unit classified as residential during bid process. May want to ask KCHA about bid instructions. #3 - Including any basement or garage, how many stories or levels does the structure have? 2 stories #4 - What is the building used for? People to live indoors instead of outdoors(a) Any commercial use in the structure? No (b) Any retail use in the structure? No (c) Permanent residence only? Yes(d) Rehabilitation house? No (e) Transitional housing? No(f) Communal dining facility? No(g) Treatment services? No(h) Dormitories? No(i) Counseling? No (j) Is each room and/or bed in the structure rented separately? No(k) Other? No #5 - Does each dwelling unit have its own self-contained kitchen? Yes#6 - Does each dwelling unit have its own bathroom? Yes#7 - Is there a community facility or manager�s office on site? Yes#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2017-02-22T00:00:00</comment_date></row><row _id="row-nm9r_7m3a_a27z" _uuid="00000000-0000-0000-6C0F-081B7529399A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nm9r_7m3a_a27z"><intent_id>910500</intent_id><project_id>853084</project_id><text_data>Cooper- 2600 Division #119Kline- 17533 Snee OoshMassingale- 45956 AlbertAllen- 11453 Bayview Edison #33</text_data><comment_date>2018-06-12T00:00:00</comment_date></row><row _id="row-zk73-tqvg_2663" _uuid="00000000-0000-0000-D987-8282A72C4DE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zk73-tqvg_2663"><intent_id>879637</intent_id><project_id>839626</project_id><text_data>1. Servicing HVAC equipment. 2.Single Family Dwelling 3. 1 4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No l)No 5. N/A 6. N/A 7. N/A 8.No</text_data><comment_date>2017-12-16T00:00:00</comment_date></row><row _id="row-pjse-6dfz~kjie" _uuid="00000000-0000-0000-90FA-77956757A17A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjse-6dfz~kjie"><intent_id>549117</intent_id><project_id>701758</project_id><text_data>Wage $45.83 per hourHealth $7.45 Per hourPension $6.18 Per hourAnnuity $1.75 Per hourNEBF $1.37 Per hour</text_data><comment_date>2012-12-19T00:00:00</comment_date></row><row _id="row-rhjw_zqb2.z9jh" _uuid="00000000-0000-0000-9AAE-B9E564D9A1E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rhjw_zqb2.z9jh"><intent_id>831409</intent_id><project_id>807809</project_id><text_data>Owner Terry Vojta ran the gunite pump, while Owner Randy Vojta helped the 2 employees apply the gunite</text_data><comment_date>2017-05-05T00:00:00</comment_date></row><row _id="row-aicp.a9f3_8gya" _uuid="00000000-0000-0000-49D1-36A04801AEF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aicp.a9f3_8gya"><intent_id>1186438</intent_id><project_id>942257</project_id><text_data>Semi Trucks hauling concrete girders with steer dolly</text_data><comment_date>2021-10-19T00:00:00</comment_date></row><row _id="row-dkf6_pvd2-wqmg" _uuid="00000000-0000-0000-763F-E10799C72984" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dkf6_pvd2-wqmg"><intent_id>687208</intent_id><project_id>758080</project_id><text_data>Form Filed by:  Steve Horning</text_data><comment_date>2015-04-02T00:00:00</comment_date></row><row _id="row-bz7k_fnja-ehr2" _uuid="00000000-0000-0000-5389-59478EEF7AE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bz7k_fnja-ehr2"><intent_id>531561</intent_id><project_id>689965</project_id><text_data>project is exempt from state prevailing wage requirements based on the housing act of 1937 and 24 CFR 965.101.workers will be paid in accordance with davis bacon wage requirements</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-d6gf~8sqb.xiz4" _uuid="00000000-0000-0000-F0D9-A256C2139930" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d6gf~8sqb.xiz4"><intent_id>904613</intent_id><project_id>841394</project_id><text_data>job #17-032</text_data><comment_date>2018-05-14T00:00:00</comment_date></row><row _id="row-item~up4x_fkvm" _uuid="00000000-0000-0000-05AA-34663DA98A64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-item~up4x_fkvm"><intent_id>1310894</intent_id><project_id>1057976</project_id><text_data>Project# 04249, Noland, Helen, 1211 E Lyons Ave, Lot 68, Spokane, WA 99208</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-9qfk-66n5~qsb2" _uuid="00000000-0000-0000-863F-5AD3DB282D8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9qfk-66n5~qsb2"><intent_id>1310894</intent_id><project_id>1057976</project_id><text_data>Project# 04243, Edelbrock, Candace, 1211 E Lyons Ave, Lot 92, Spokane, WA 99208</text_data><comment_date>2023-03-28T00:00:00</comment_date></row><row _id="row-hamf~khkw_a5sv" _uuid="00000000-0000-0000-912E-31667C30BAC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hamf~khkw_a5sv"><intent_id>1316200</intent_id><project_id>980319</project_id><text_data>5.5 hours worked on 3/14/2023</text_data><comment_date>2023-04-09T00:00:00</comment_date></row><row _id="row-89du~h43s-jyx6" _uuid="00000000-0000-0000-995C-84A285D53DDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89du~h43s-jyx6"><intent_id>1316713</intent_id><project_id>1061590</project_id><text_data>IFS WO# 150599, Repair retaining wall per Kevin Vaughan, repair rock retaining wall by putting new stones in place by hand.</text_data><comment_date>2023-04-04T00:00:00</comment_date></row><row _id="row-bxv3~ui8a.ruck" _uuid="00000000-0000-0000-4E34-96B04911F92B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bxv3~ui8a.ruck"><intent_id>1336166</intent_id><project_id>1069507</project_id><text_data>Fire Alarm</text_data><comment_date>2023-06-14T00:00:00</comment_date></row><row _id="row-9rvy-yiv3~9hta" _uuid="00000000-0000-0000-74F4-732D7D907948" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9rvy-yiv3~9hta"><intent_id>1060293</intent_id><project_id>920073</project_id><text_data>In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions in the notes section at the bottom of this screen: #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment#3 - Including any basement or garage, how many stories or levels does the structure have? 2#4 - What is the building used for? residential --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NONE(b) Any retail use in the structure? NONE(c) Permanent residence only? CONFIRMED(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(I) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO(l) Other?  NA#5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on site? YES#8 - Is any part of the structure used by members of the public? NO JUST RESIDENTS</text_data><comment_date>2020-05-27T00:00:00</comment_date></row><row _id="row-7hw7.66b7.vfkc" _uuid="00000000-0000-0000-4F38-72DA86AB117E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7hw7.66b7.vfkc"><intent_id>995711</intent_id><project_id>888719</project_id><text_data>Remove 4' caliper or less trees, shrubs and ground cover along west chain link fence. Cut logs into manageable pieces, chip all lateral limbs / vegetation.</text_data><comment_date>2019-07-30T00:00:00</comment_date></row><row _id="row-f37g.wszv-xqjk" _uuid="00000000-0000-0000-76BA-D5E52E5D1095" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f37g.wszv-xqjk"><intent_id>1310894</intent_id><project_id>1057976</project_id><text_data>Project# 04223, Buckelew, Lois, 1205 E Lyons Ave, Lot 134, Spokane, WA 99208</text_data><comment_date>2023-03-20T00:00:00</comment_date></row><row _id="row-qys9~kr22.25we" _uuid="00000000-0000-0000-6862-5A1666DF2701" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qys9~kr22.25we"><intent_id>530448</intent_id><project_id>604129</project_id><text_data>Beautification of area adjacent to roadway through the installation of grass.  Equip: Hydroseeder, hand tools</text_data><comment_date>2012-08-23T00:00:00</comment_date></row><row _id="row-mhfh_uw7d~8zug" _uuid="00000000-0000-0000-7F38-96C9699B82E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mhfh_uw7d~8zug"><intent_id>584555</intent_id><project_id>704635</project_id><text_data>This Intent is for Bid Package #113</text_data><comment_date>2013-07-31T00:00:00</comment_date></row><row _id="row-5ffu_t3dp-7g9v" _uuid="00000000-0000-0000-F505-5A1314A7A90C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ffu_t3dp-7g9v"><intent_id>658632</intent_id><project_id>745914</project_id><text_data>81038183159/1/14-2/28/15</text_data><comment_date>2014-10-06T00:00:00</comment_date></row><row _id="row-8yv3-8r9s~d56f" _uuid="00000000-0000-0000-C89B-BACD53520277" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yv3-8r9s~d56f"><intent_id>756252</intent_id><project_id>789405</project_id><text_data>Ellen Lloyde15264 Oak Dr 98058</text_data><comment_date>2016-04-13T00:00:00</comment_date></row><row _id="row-xqbj_kuqs-cvqk" _uuid="00000000-0000-0000-62FA-B7F1DA8303E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xqbj_kuqs-cvqk"><intent_id>508700</intent_id><project_id>686346</project_id><text_data>Form filed by: Natalie Nieves</text_data><comment_date>2012-04-20T00:00:00</comment_date></row><row _id="row-icb3~tgr7~ky3u" _uuid="00000000-0000-0000-DF00-A8148E9C60FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-icb3~tgr7~ky3u"><intent_id>890596</intent_id><project_id>842883</project_id><text_data>F3501</text_data><comment_date>2018-03-01T00:00:00</comment_date></row><row _id="row-s2i8.kx9r~6fcs" _uuid="00000000-0000-0000-92E8-56A1DAB62507" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s2i8.kx9r~6fcs"><intent_id>882925</intent_id><project_id>841263</project_id><text_data>This is a single family, one story mobile home used for permanent residency.  No garage and no basement.  It has one kitchen that is solely used for residential one family use.  we will be repairing a water line leak in the crawl space area.</text_data><comment_date>2018-01-11T00:00:00</comment_date></row><row _id="row-cz29~6gpe~9qpr" _uuid="00000000-0000-0000-1E15-70F23E369154" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cz29~6gpe~9qpr"><intent_id>783659</intent_id><project_id>791084</project_id><text_data>Union Contractor7.52 Medical Ins16.50 Pensions.99 Apprentice Training</text_data><comment_date>2016-08-19T00:00:00</comment_date></row><row _id="row-zv4a-563y~piit" _uuid="00000000-0000-0000-5A61-C634ECCFEE15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zv4a-563y~piit"><intent_id>480067</intent_id><project_id>675102</project_id><text_data>Scope of work involves removing existing bark from landscaped areas and replace with rock mulch using usual landscape equipment including a small motorized buggy (under 90 hp), wheelbarrow, rakes, etc.</text_data><comment_date>2011-09-25T00:00:00</comment_date></row><row _id="row-vfzk.4yda~qyar" _uuid="00000000-0000-0000-87EF-F62A75CFC95D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfzk.4yda~qyar"><intent_id>1169612</intent_id><project_id>972440</project_id><text_data>The subcontractor's duties for this project were to bring playground material in their truck to the facility where everything was marked and ready for their guy (landscape construction) to take a hose and blow the product on the playground where they were told to. No other tools, etc. are used.</text_data><comment_date>2021-08-17T00:00:00</comment_date></row><row _id="row-dsvf~3nhf.t4pk" _uuid="00000000-0000-0000-7521-DD89D6F7ADA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dsvf~3nhf.t4pk"><intent_id>1244100</intent_id><project_id>1019264</project_id><text_data>Fringes: Vacation $4.00, Assessment $1.30, Insurance $9.46, Pension $16.55, Training $1.63, Industry Improvement $.50</text_data><comment_date>2022-06-24T00:00:00</comment_date></row><row _id="row-ebbv.5hv6_zzh3" _uuid="00000000-0000-0000-4069-5CB64714A09E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebbv.5hv6_zzh3"><intent_id>1118172</intent_id><project_id>948250</project_id><text_data>301FR7492M - INTENT</text_data><comment_date>2021-01-27T00:00:00</comment_date></row><row _id="row-g7zg-4w27-8yy5" _uuid="00000000-0000-0000-14EE-63B1DFBD375E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g7zg-4w27-8yy5"><intent_id>1160611</intent_id><project_id>970833</project_id><comment_date>2021-07-15T00:00:00</comment_date></row><row _id="row-r3qz_3mgg~gzud" _uuid="00000000-0000-0000-2FFC-389C6E052EB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r3qz_3mgg~gzud"><intent_id>711890</intent_id><project_id>744439</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-08-04T00:00:00</comment_date></row><row _id="row-mxew~dm9y-dqpn" _uuid="00000000-0000-0000-2710-972BF34B96F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mxew~dm9y-dqpn"><intent_id>898107</intent_id><project_id>838466</project_id><text_data>1517341</text_data><comment_date>2018-04-11T00:00:00</comment_date></row><row _id="row-urwj-afnr~hkk9" _uuid="00000000-0000-0000-AFE8-E95DE43AA1E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-urwj-afnr~hkk9"><intent_id>765120</intent_id><project_id>793231</project_id><text_data>Removal of Concrete wall</text_data><comment_date>2016-05-31T00:00:00</comment_date></row><row _id="row-xs79.95pp_s29i" _uuid="00000000-0000-0000-5AC6-398D5FF385E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xs79.95pp_s29i"><intent_id>1096963</intent_id><project_id>933743</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. INSTALLATION OF A DUCTLESS HEAT PUMP SYSTEM.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? SINGLE FAMILY#3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO(c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO (h) Assisted living services? NO (I) Dormitories? NO(j) Counseling? NO (k) Is each room and/or bed in the structure rented separately? N/A (l) Other? N/A#5 - Does each dwelling unit have its own self-contained kitchen? N/A#6 - Does each dwelling unit have its own bathroom? N/A #7 - Is there a community facility or manager�s office on site?  NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2020-10-19T00:00:00</comment_date></row><row _id="row-dv77.rgsm.6n3q" _uuid="00000000-0000-0000-9D15-ED3392F7390E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dv77.rgsm.6n3q"><intent_id>897415</intent_id><project_id>847817</project_id><text_data>We are going to remove the old irrigation drip system and we are replaced to new irrigation sprayed heads.</text_data><comment_date>2018-04-09T00:00:00</comment_date></row><row _id="row-ihdr~9vff-mn89" _uuid="00000000-0000-0000-B9BA-71DB3DC4F3A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihdr~9vff-mn89"><intent_id>1008376</intent_id><project_id>893743</project_id><text_data>Install ADA Playground Chips into designated play areas.</text_data><comment_date>2019-09-19T00:00:00</comment_date></row><row _id="row-dzg5_9k3m-33wm" _uuid="00000000-0000-0000-34F9-00C472281FBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dzg5_9k3m-33wm"><intent_id>804039</intent_id><project_id>807948</project_id><text_data>Job # 16220</text_data><comment_date>2016-11-23T00:00:00</comment_date></row><row _id="row-84ng~icrz-wim8" _uuid="00000000-0000-0000-1DA1-35347B04DDD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-84ng~icrz-wim8"><intent_id>977108</intent_id><project_id>880812</project_id><text_data>Trash debris pick up, and minor repair. Wall patch, door hinge, trim repair, and sometimes touch up paint. and light bulb change.  Broom, dustpan, screwdriver, hammer, paintbrush.</text_data><comment_date>2019-05-16T00:00:00</comment_date></row><row _id="row-ivhb~vek7~a4zr" _uuid="00000000-0000-0000-D783-85725BE32C72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ivhb~vek7~a4zr"><intent_id>1221120</intent_id><project_id>1005682</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.22-80-120</text_data><comment_date>2022-03-28T00:00:00</comment_date></row><row _id="row-muak.c2uz.2uer" _uuid="00000000-0000-0000-02F2-E1A5106156C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-muak.c2uz.2uer"><intent_id>982791</intent_id><project_id>822368</project_id><text_data>I am an Owner/Operator</text_data><comment_date>2019-06-06T00:00:00</comment_date></row><row _id="row-p3zy_ra4j_f3ng" _uuid="00000000-0000-0000-6140-0A04A6EAEBDA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p3zy_ra4j_f3ng"><intent_id>641816</intent_id><project_id>709235</project_id><text_data>�Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.�</text_data><comment_date>2014-11-19T00:00:00</comment_date></row><row _id="row-9ppe_sw8t.2m8c" _uuid="00000000-0000-0000-895C-DF1B28E1D650" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ppe_sw8t.2m8c"><intent_id>775717</intent_id><project_id>797294</project_id><text_data>GENERAL LABOR WILL DO CLEAN UP AND MOVE MATERIALS WITH RAKES &amp; SHOVELS</text_data><comment_date>2016-07-19T00:00:00</comment_date></row><row _id="row-zqsp-zhka.pznv" _uuid="00000000-0000-0000-0404-C97099DA5517" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zqsp-zhka.pznv"><intent_id>777951</intent_id><project_id>798136</project_id><text_data>Workers Keith Burrell and Mike Poe 1. Weatherization 2.SFD 3.one 4,a,b no c, yes d,e,f,g,h,i,j no 5,6 yes 7,yes 8,no</text_data><comment_date>2016-07-27T00:00:00</comment_date></row><row _id="row-wauj~p69h_p5yr" _uuid="00000000-0000-0000-DB76-1FE49207DD4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wauj~p69h_p5yr"><intent_id>656871</intent_id><project_id>741683</project_id><text_data>1413 queen ave Yakima,wa 98902 1. install bath fan 2. single family house 3. 1 level 4a. no b. no c. yes d. no e. no f. no g. no h. no I. no j. no k. no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2014-09-25T00:00:00</comment_date></row><row _id="row-5gx2~sefw_38ag" _uuid="00000000-0000-0000-2257-14A10DDBC04F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5gx2~sefw_38ag"><intent_id>1168741</intent_id><project_id>973249</project_id><text_data>Granite job# 1129230TRUCKS - lowboy delivers asphalt rotomill to jobsite</text_data><comment_date>2021-08-12T00:00:00</comment_date></row><row _id="row-85zt.fkp2_w9yi" _uuid="00000000-0000-0000-B8CB-0BD149204622" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-85zt.fkp2_w9yi"><intent_id>534551</intent_id><project_id>692910</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) will perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-07-05T00:00:00</comment_date></row><row _id="row-gyab-4j4y_uj7t" _uuid="00000000-0000-0000-EDE9-C935215171FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gyab-4j4y_uj7t"><intent_id>1318170</intent_id><project_id>1062490</project_id><text_data>W1526669 - Intent</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-cjun.ktds~us7b" _uuid="00000000-0000-0000-25DB-3DC9F1B2CD32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjun.ktds~us7b"><intent_id>1052295</intent_id><project_id>916152</project_id><text_data>LandCare will provide the following services to Camas Ridge under this contract.Maintenance Visit, Winter Visit (Leaf, Dormant Prune, &amp; Policing), Irrigation Start Up, Irrigation Checks, Irrigation Shut Down, Turf Fertilization - Slow Release, Turf Fertilization Winter Turf, Weed Mgmt Application, Fall Bed Fertilization, Bed Pre-emergent, Bed Pre-emergent - Fall Plant Growth Regulator, Summer Flowers Winter Flowers, Turf Post-Emergent Weed Management, and Irrigation Backflow Service</text_data><comment_date>2020-06-17T00:00:00</comment_date></row><row _id="row-axqj~bge4-jutb" _uuid="00000000-0000-0000-F640-4D2CF427B442" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-axqj~bge4-jutb"><intent_id>1105448</intent_id><project_id>941086</project_id><text_data>2010114 LE</text_data><comment_date>2020-11-23T00:00:00</comment_date></row><row _id="row-9g6t_zkds_kgqf" _uuid="00000000-0000-0000-7D3C-EDCED7FC577D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9g6t_zkds_kgqf"><intent_id>1004260</intent_id><project_id>892074</project_id><text_data>Job #31711-1</text_data><comment_date>2019-09-03T00:00:00</comment_date></row><row _id="row-nt9r.i78h-733n" _uuid="00000000-0000-0000-E4AA-253B1718C1B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nt9r.i78h-733n"><intent_id>607818</intent_id><project_id>725302</project_id><text_data>Intent covers the following addresses:210302 E 315 PRSE, Kennewick205 S Waverly, Kennewick391 Greenfield Road, Mesa</text_data><comment_date>2013-12-10T00:00:00</comment_date></row><row _id="row-2fys_utcz~6j2c" _uuid="00000000-0000-0000-C15E-AA4285FECD98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2fys_utcz~6j2c"><intent_id>1151246</intent_id><project_id>960351</project_id><text_data>Single Family Dwelling</text_data><comment_date>2021-06-09T00:00:00</comment_date></row><row _id="row-7sff~gmmi.fx8k" _uuid="00000000-0000-0000-CA6F-4E919B52EB0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7sff~gmmi.fx8k"><intent_id>774521</intent_id><project_id>796853</project_id><text_data>Vehicles used: Chevy Astro Van, Ford Ranger, Ford 150 Pickup, Dodge Ram 1500 Pickup</text_data><comment_date>2016-07-13T00:00:00</comment_date></row><row _id="row-3m6c~uiy8-mv2p" _uuid="00000000-0000-0000-07AC-5C2763ECC9A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3m6c~uiy8-mv2p"><intent_id>599101</intent_id><project_id>711951</project_id><text_data>Owner Operater Dump Truck Driver</text_data><comment_date>2013-10-13T00:00:00</comment_date></row><row _id="row-tkgx.bcgw~jgc9" _uuid="00000000-0000-0000-CCE5-1FF48AE3A48D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tkgx.bcgw~jgc9"><intent_id>539618</intent_id><project_id>697776</project_id><text_data>142019</text_data><comment_date>2012-10-12T00:00:00</comment_date></row><row _id="row-xc6u.ndps_tz8y" _uuid="00000000-0000-0000-C9C0-D490FB028AA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xc6u.ndps_tz8y"><intent_id>654042</intent_id><project_id>721784</project_id><text_data>MOST OF THE WORK WAS DONE BY THE COMPANY OWNER</text_data><comment_date>2014-09-11T00:00:00</comment_date></row><row _id="row-4hw9-rq5a.v4tf" _uuid="00000000-0000-0000-D315-432AD5442A08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4hw9-rq5a.v4tf"><intent_id>505328</intent_id><project_id>684850</project_id><text_data>Invoice 697500</text_data><comment_date>2012-03-26T00:00:00</comment_date></row><row _id="row-3cau~ydvm-yxam" _uuid="00000000-0000-0000-0C4D-0CE41ECFCE02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3cau~ydvm-yxam"><intent_id>538657</intent_id><project_id>697420</project_id><text_data>MMFS Job #7326791</text_data><comment_date>2012-10-08T00:00:00</comment_date></row><row _id="row-x94w.f3ma_37vr" _uuid="00000000-0000-0000-4083-7FB5BBC1B231" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x94w.f3ma_37vr"><intent_id>484971</intent_id><project_id>676712</project_id><text_data>1)YES, 2)1, 3A)YES, 3B-G) NO, 4)YES, 5)YES, 6)NO, 7)NO</text_data><comment_date>2011-11-03T00:00:00</comment_date></row><row _id="row-nm3k-c38r.fvup" _uuid="00000000-0000-0000-3E7C-08F6041172D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nm3k-c38r.fvup"><intent_id>849896</intent_id><project_id>822485</project_id><text_data>Install 180 plants and put down mulch, put down 50 yards of topsoil.</text_data><comment_date>2017-08-01T00:00:00</comment_date></row><row _id="row-zy44_pmxn_me3r" _uuid="00000000-0000-0000-79AA-AE20D3F5C1C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zy44_pmxn_me3r"><intent_id>650949</intent_id><project_id>742981</project_id><text_data>They hand dug the dirt back away from the wall and hand removed the drain mat where it was installed. They removed the sticky back protection on the Grace waterproofing sheets and applied it to the wall then covered it with new drain mat and rotohammered a termination bar at the top, then backfilled with pea gravel to be complete.</text_data><comment_date>2014-09-29T00:00:00</comment_date></row><row _id="row-7xt4~5qyh~pvb6" _uuid="00000000-0000-0000-1FE8-DBDD7EA31966" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7xt4~5qyh~pvb6"><intent_id>648603</intent_id><project_id>738909</project_id><text_data>143722Provide and install cat 6 cabling for data, terminate, test and label. All cable will be run indoors. Provide and install backbone cabling from the MDF to the shop building, cabling will run underground outdoors. Terminate, test and label.</text_data><comment_date>2014-08-18T00:00:00</comment_date></row><row _id="row-utwf-6ijj~jf49" _uuid="00000000-0000-0000-1394-1CAC4C07E241" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utwf-6ijj~jf49"><intent_id>1465996</intent_id><project_id>1143448</project_id><text_data>Beynon Sports was contracted to complete the following: � Remove existing crack membrane @ approximately 150�.   � High pressure-wash the entire court surface as needed.   � Flood court surface and mark low areas that hold water over the depth of a nickel. Proper slope must be present to alleviate birdbaths.   � Patch and repair low areas, fill *cracks.   � Apply one coat of Acrylic Resurfacer to the entire court surface.   � Apply two textured Color Filler coats to the entire court surface.   � Apply one textured Color Finish coat to the entire court surface.   �  Lines will be accurately laid out, taped, primed, and painted with two coats White Textured Line Paint.   Furnish and install **Riteway crack membrane @ approximately 450�. All of the materials such as the Concrete, Acrylic Resurfacer, etc. will be delivered to the Jobsite by our suppliers these are not delivered by our employees to the jobsite.</text_data><comment_date>2024-09-12T00:00:00</comment_date></row><row _id="row-i8bz.feu6_bi53" _uuid="00000000-0000-0000-B593-1B235046EB70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i8bz.feu6_bi53"><intent_id>663061</intent_id><project_id>746249</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NOHOMETOWN PM1072 CENTRAL ST SE1074 CENTRAL ST SEOLYMPIA 98501</text_data><comment_date>2014-10-29T00:00:00</comment_date></row><row _id="row-73a8~vequ-zv98" _uuid="00000000-0000-0000-C513-E0E6F9B19B32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-73a8~vequ-zv98"><intent_id>1118796</intent_id><project_id>948564</project_id><text_data>Elect tech(06)Inside workreplace damaged tie cable</text_data><comment_date>2021-01-29T00:00:00</comment_date></row><row _id="row-t3du-dbrz.icd6" _uuid="00000000-0000-0000-2DC4-09FE1B3BEDA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3du-dbrz.icd6"><intent_id>732494</intent_id><project_id>768460</project_id><text_data>Hourly Union Benefits  (**1st/2nd Period Apprentices do not receive this benefit)**Annuity  - 5.55Apprenticeship   - .67Health   - 7.02Impact   - .30**Pension   - 9.95</text_data><comment_date>2015-11-19T00:00:00</comment_date></row><row _id="row-4vty_xj73~9rku" _uuid="00000000-0000-0000-85E5-03099503F7B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4vty_xj73~9rku"><intent_id>1251512</intent_id><project_id>1023150</project_id><text_data>3001954-9003</text_data><comment_date>2022-07-22T00:00:00</comment_date></row><row _id="row-qah7-xkaa_fhgv" _uuid="00000000-0000-0000-251E-80402E066857" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qah7-xkaa_fhgv"><intent_id>969326</intent_id><project_id>850526</project_id><text_data>�Project is exempt from state prevailing wage requirements based onThe Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirementsFor the following crafts/trades/occupations.� Intent Id Numbers904106 � KCHA Munro Manor904109 � KCHA Blvd. Manor904110 � KCHA Southridge House</text_data><comment_date>2019-04-03T00:00:00</comment_date></row><row _id="row-83yx~3ify-jdmw" _uuid="00000000-0000-0000-1E5D-DA567FAFBC19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-83yx~3ify-jdmw"><intent_id>839634</intent_id><project_id>824034</project_id><text_data>American Longshore Mutual Association,LTD. Policy No. ALMA01008-03</text_data><comment_date>2017-06-09T00:00:00</comment_date></row><row _id="row-cw6h~pqws~6389" _uuid="00000000-0000-0000-878E-6D5EB0E8707B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cw6h~pqws~6389"><intent_id>976044</intent_id><project_id>880354</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborers Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2019-05-06T00:00:00</comment_date></row><row _id="row-zcr3-2aqf.gcsk" _uuid="00000000-0000-0000-7EBF-144ED7C23BCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zcr3-2aqf.gcsk"><intent_id>1417897</intent_id><project_id>1119416</project_id><text_data>Had to file a new intent as previous intent # 1338045 was mistakenly filed under the wrong awarding agency.</text_data><comment_date>2024-04-10T00:00:00</comment_date></row><row _id="row-9q7d.usd3.fygh" _uuid="00000000-0000-0000-A6A9-E6D194D1118E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9q7d.usd3.fygh"><intent_id>738117</intent_id><project_id>780981</project_id><text_data>18.28 Fringe DetailsHW 4.25Pension 14.03</text_data><comment_date>2015-12-17T00:00:00</comment_date></row><row _id="row-scj5_bq99-ytgx" _uuid="00000000-0000-0000-8F35-707DB135ABB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-scj5_bq99-ytgx"><intent_id>1022327</intent_id><project_id>882988</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2019-11-18T00:00:00</comment_date></row><row _id="row-b4gi~dhcj-knvd" _uuid="00000000-0000-0000-878A-70D8E606F62F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b4gi~dhcj-knvd"><intent_id>1310894</intent_id><project_id>1057976</project_id><text_data>Project# 04245, Dvorak, Wilbert, 3813 W Brophy Rd, Deer Park, WA 99006</text_data><comment_date>2023-03-23T00:00:00</comment_date></row><row _id="row-5uwv_5ii2~eprw" _uuid="00000000-0000-0000-2031-1BD1AFA79D5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5uwv_5ii2~eprw"><intent_id>626721</intent_id><project_id>721546</project_id><text_data>Form filed by: Sue Heidemann</text_data><comment_date>2014-04-25T00:00:00</comment_date></row><row _id="row-4wy7.sasz~3fe6" _uuid="00000000-0000-0000-3985-165CF8476A7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4wy7.sasz~3fe6"><intent_id>1038052</intent_id><project_id>908248</project_id><text_data>FILED BY KRIS SWEITZER</text_data><comment_date>2020-02-12T00:00:00</comment_date></row><row _id="row-xkca_t3pv.au4q" _uuid="00000000-0000-0000-4FAA-CD90030739DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xkca_t3pv.au4q"><intent_id>1272795</intent_id><project_id>972641</project_id><comment_date>2022-10-07T00:00:00</comment_date></row><row _id="row-5uud-8g4s.axvv" _uuid="00000000-0000-0000-5D57-FFDFAC29226A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5uud-8g4s.axvv"><intent_id>522894</intent_id><project_id>691808</project_id><text_data>Owner mowed</text_data><comment_date>2012-07-17T00:00:00</comment_date></row><row _id="row-vn78~yz2n~g7z2" _uuid="00000000-0000-0000-BAAE-07FFF9376EE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vn78~yz2n~g7z2"><intent_id>1085131</intent_id><project_id>891115</project_id><text_data>We will be providing and installing gymnasium equipment, which is permanent to the building.</text_data><comment_date>2020-09-01T00:00:00</comment_date></row><row _id="row-gz4q~z4xr.4y5c" _uuid="00000000-0000-0000-F6D4-64A49768A137" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gz4q~z4xr.4y5c"><intent_id>774754</intent_id><project_id>796955</project_id><text_data>1 INSTALL DUCTLESS HVAC2 SINGLE FAMILY3 14 A)NO B)NO C)YES D)NO E)NO F)NO I)NO J)NO K)NO5 YES 6 YES7 NO8 NO</text_data><comment_date>2016-07-14T00:00:00</comment_date></row><row _id="row-gbjk_3umi-7mca" _uuid="00000000-0000-0000-BD2F-4FA6ED66B977" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbjk_3umi-7mca"><intent_id>593599</intent_id><project_id>719957</project_id><text_data>Additional cleanup work; removal of soil and concrete that was left and installation of plants.  All landscape is to previous landscape.</text_data><comment_date>2013-09-13T00:00:00</comment_date></row><row _id="row-dc8p.hvex-t6xh" _uuid="00000000-0000-0000-FD10-4043EA37B4E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dc8p.hvex-t6xh"><intent_id>913590</intent_id><project_id>854264</project_id><text_data>1. Weatherize Home2. Single Family Dwelling3.One Level4.a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no l.no5.yes6.yes7.no8.no</text_data><comment_date>2018-06-25T00:00:00</comment_date></row><row _id="row-26rk~rmdw_v4rw" _uuid="00000000-0000-0000-262E-A614F5B78509" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-26rk~rmdw_v4rw"><intent_id>1339142</intent_id><project_id>1074420</project_id><text_data>The use of carts, dollies, hand trucks to accommodate onsite relocation.</text_data><comment_date>2023-06-23T00:00:00</comment_date></row><row _id="row-mr3q.hw6j.fcpm" _uuid="00000000-0000-0000-901D-B70957E461D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mr3q.hw6j.fcpm"><intent_id>708517</intent_id><project_id>767789</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2015-07-28T00:00:00</comment_date></row><row _id="row-rak6.azq4.vejy" _uuid="00000000-0000-0000-1128-DF29740D5E5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rak6.azq4.vejy"><intent_id>1189594</intent_id><project_id>983771</project_id><text_data>Tapers FB: Health $7.88, Pension $12.23, Apprenticeship $.65, Other $.42 Carpenters FB: Health $8.63, Pension $8.87, Apprenticeship $1.06, Other $.15</text_data><comment_date>2021-12-03T00:00:00</comment_date></row><row _id="row-6b5t-953z-7c8q" _uuid="00000000-0000-0000-61AD-F30FE6CCF2A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6b5t-953z-7c8q"><intent_id>673364</intent_id><project_id>752458</project_id><text_data>No Fringe Benefits(usual or otherwise)No Medical Insurance, No Life Insurance, No Pension, No Vacation, No HolidayIndustrial Insurance Acct No: 16582501</text_data><comment_date>2015-01-28T00:00:00</comment_date></row><row _id="row-8d79_ikz7.gst9" _uuid="00000000-0000-0000-3616-EF97560ABEF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8d79_ikz7.gst9"><intent_id>989348</intent_id><project_id>886243</project_id><text_data>Will install new vinyl planks flooring, new rubber base and will provide materials plus removal ad reset toilets in bathrooms in an apartment complex.</text_data><comment_date>2019-07-19T00:00:00</comment_date></row><row _id="row-v9dt_eftv~3gqi" _uuid="00000000-0000-0000-CB98-EB2013AE4E01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v9dt_eftv~3gqi"><intent_id>1143050</intent_id><project_id>961516</project_id><text_data>Invoice #127992 plumbing</text_data><comment_date>2021-05-08T00:00:00</comment_date></row><row _id="row-fjcc-xqva_8kts" _uuid="00000000-0000-0000-32AF-8BD2FE143B83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fjcc-xqva_8kts"><intent_id>667955</intent_id><project_id>730880</project_id><text_data>Track Striping</text_data><comment_date>2014-12-02T00:00:00</comment_date></row><row _id="row-e222-xquk~5bgc" _uuid="00000000-0000-0000-7895-7718B4F5FE7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e222-xquk~5bgc"><intent_id>974119</intent_id><project_id>855643</project_id><text_data>PME job# 13-1821-08TRUCKSlowboy delivers asphalt rotomill to jobsite</text_data><comment_date>2019-04-26T00:00:00</comment_date></row><row _id="row-yewj_jvq6.w3ep" _uuid="00000000-0000-0000-56BC-18D9CA2D5130" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yewj_jvq6.w3ep"><intent_id>571135</intent_id><project_id>687750</project_id><text_data>H&amp;W - $8.16, Pension - $10.30, Training - $1.48, Other (Industry Improvement Trust) - $.30H&amp;W - $8.16, Pension - $1.95, Training - $1.20, Other (Industry Improvement Trust) - $.30</text_data><comment_date>2013-05-22T00:00:00</comment_date></row><row _id="row-yg6k~ippv-ukn4" _uuid="00000000-0000-0000-EA6A-3EDE7B29F58E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yg6k~ippv-ukn4"><intent_id>554283</intent_id><project_id>704027</project_id><text_data>NWC #3612</text_data><comment_date>2013-01-31T00:00:00</comment_date></row><row _id="row-ewn2-ap3u_bpku" _uuid="00000000-0000-0000-2E0D-DD8A823B93C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ewn2-ap3u_bpku"><intent_id>905353</intent_id><project_id>847226</project_id><text_data>Apparently, the original e-check to pay for the intent did not clear the bank. We received notice and resubmitted payment.  Last week I called AllianceOne to followup, as when we resubmitted the intent it was kicked back again.  AllianceOne told me that they received the resubmitted payment for this intent on 10/11/2018.  I have called and left messages for Donna Hanson twice trying to clear this up.  Please contact me if you need additional information or there is further action required on our part.  Pat Balfour 360-671-0762</text_data><comment_date>2019-04-05T00:00:00</comment_date></row><row _id="row-7s3y-cc96_7cii" _uuid="00000000-0000-0000-2C49-07B9A7A50E86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7s3y-cc96_7cii"><intent_id>468312</intent_id><project_id>667453</project_id><text_data>Install split rail fence and restoration planting with hand and power tools.</text_data><comment_date>2011-07-26T00:00:00</comment_date></row><row _id="row-tqhf-yup8~zrfp" _uuid="00000000-0000-0000-3A35-BFA7F5BECA6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tqhf-yup8~zrfp"><intent_id>676837</intent_id><project_id>754642</project_id><text_data>1)We were contracted to repair the furance 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2015-01-28T00:00:00</comment_date></row><row _id="row-ehkc~s2m5_id8g" _uuid="00000000-0000-0000-88E4-A85AC48C0F3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ehkc~s2m5_id8g"><intent_id>511529</intent_id><project_id>684537</project_id><text_data>PROJECT IS EXEMPT FROM STATE PREVAILING WAGE REQUIREMENTS BASED ON THE HOUSING ACT OF 1937 AND 24 CFR 965.101.  WORKERS WILL BE PAID IN ACCORDANCE WITH DAVIS-BACON WAGE REQUIREMENTS FOR THE FOLLOWING CRAFTS/TRADES/OCCUPATION.</text_data><comment_date>2012-05-11T00:00:00</comment_date></row><row _id="row-xaxu_zjhy-yag8" _uuid="00000000-0000-0000-A7FA-E04F9CCAD9E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xaxu_zjhy-yag8"><intent_id>1465899</intent_id><project_id>1056986</project_id><comment_date>2024-09-12T00:00:00</comment_date></row><row _id="row-rz26.74x6~n2ar" _uuid="00000000-0000-0000-73F8-44E024E0B17E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rz26.74x6~n2ar"><intent_id>1469570</intent_id><project_id>1146563</project_id><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-gg5w~kdd3_k9hq" _uuid="00000000-0000-0000-51B4-1994B0ABF58A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gg5w~kdd3_k9hq"><intent_id>1215071</intent_id><project_id>1001757</project_id><text_data>Fringe: Health $15.88, Pension $10.46, Education $.64, Preservation .54, Annuity $8.85, Vacation $4.62, Holiday $1.91 = Rounded 42.90 - Tacoma Inv 5001679655</text_data><comment_date>2022-03-02T00:00:00</comment_date></row><row _id="row-9txv_g28t~8ixx" _uuid="00000000-0000-0000-960B-FF4C44588629" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9txv_g28t~8ixx"><intent_id>1042163</intent_id><project_id>909373</project_id><text_data>204291-002</text_data><comment_date>2020-03-02T00:00:00</comment_date></row><row _id="row-jmzk_fwfq.ncrt" _uuid="00000000-0000-0000-D027-67CE978CEB8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jmzk_fwfq.ncrt"><intent_id>784501</intent_id><project_id>800637</project_id><text_data>Filed by Sue RedmanAbbey Party Rents will deliver and pickup all rental equipment in an Abbey Party Rents 17&amp;#39; box truck ordered by the Port of Seattle. The crew will unload the equipment and will erect the canopies. The crew will use hand trucks, carts Leatherman tools.</text_data><comment_date>2016-08-23T00:00:00</comment_date></row><row _id="row-nrg5-d9m5-3feu" _uuid="00000000-0000-0000-7271-C160D2A2AA82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrg5-d9m5-3feu"><intent_id>891140</intent_id><project_id>829895</project_id><text_data>PPC# 17401</text_data><comment_date>2018-03-05T00:00:00</comment_date></row><row _id="row-evxf_x9n4-2xij" _uuid="00000000-0000-0000-CE3F-39C175E52770" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-evxf_x9n4-2xij"><intent_id>1099499</intent_id><project_id>934514</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site. General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2020-10-28T00:00:00</comment_date></row><row _id="row-5u7d_6igp~6dam" _uuid="00000000-0000-0000-59C4-6A36836F03CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5u7d_6igp~6dam"><intent_id>940503</intent_id><project_id>859709</project_id><text_data>Owner/Operator Dump Truck</text_data><comment_date>2018-10-18T00:00:00</comment_date></row><row _id="row-sq8x.25av_n7a8" _uuid="00000000-0000-0000-D284-EDA6038449C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sq8x.25av_n7a8"><intent_id>784755</intent_id><project_id>800713</project_id><text_data>162534-Per WAC 296-127-01378 Telecommunications Technicians will be installing cabling for computers.  Cables will run indoors.  Terminate, Test and Label.</text_data><comment_date>2016-08-24T00:00:00</comment_date></row><row _id="row-mh6a_qrpz.upvk" _uuid="00000000-0000-0000-9755-3DE3DB454E5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mh6a_qrpz.upvk"><intent_id>1022430</intent_id><project_id>899862</project_id><text_data>Laborers to lay boom and skim retention pond of all fuels</text_data><comment_date>2019-11-19T00:00:00</comment_date></row><row _id="row-rb99_3eix.g9nd" _uuid="00000000-0000-0000-2F2F-D4491E570683" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rb99_3eix.g9nd"><intent_id>991485</intent_id><project_id>887065</project_id><text_data>#20498, Garner, Jessica, 11302 E 12th, Spokane Valley</text_data><comment_date>2019-07-30T00:00:00</comment_date></row><row _id="row-8yu5.e4mh_v2hk" _uuid="00000000-0000-0000-A462-3B48B91BB63A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yu5.e4mh_v2hk"><intent_id>1161939</intent_id><project_id>965059</project_id><text_data>We are a subcontractor for FieldTurf. They have been hired to improve the athletic surfaces at Quincy Middle School. We are supplying and installing a sealed/impermeable polyurethane base mat and 2 coats of a pigmented structural spray on the track oval, high jump pad, long/triple jump runway &amp; the pole vault runway. Once we make sure the track surface is safe, we will spray paint lines on the track for lanes and track events. Our crew uses tools like a power washer, shovels, rakes, brooks and wheelbarrows. We also use scissors and tape for masking areas to keep the other surfaces clean.</text_data><comment_date>2021-07-20T00:00:00</comment_date></row><row _id="row-53xy-tijt_jg8k" _uuid="00000000-0000-0000-814A-221D3AA0ABA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-53xy-tijt_jg8k"><intent_id>1022090</intent_id><project_id>874897</project_id><text_data>FILED BY MONTE LONG</text_data><comment_date>2019-11-15T00:00:00</comment_date></row><row _id="row-u3fr-hkv9.dren" _uuid="00000000-0000-0000-5F7A-AD95A5177EF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u3fr-hkv9.dren"><intent_id>508244</intent_id><project_id>661833</project_id><text_data>Filed By: Scott -boyi235</text_data><comment_date>2012-04-18T00:00:00</comment_date></row><row _id="row-v5qc_i2ff.6umy" _uuid="00000000-0000-0000-020A-6FA145E21D7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v5qc_i2ff.6umy"><intent_id>602281</intent_id><project_id>723055</project_id><text_data>Installation only of standard data grade communications wiring, indoor CMR or CMP rated cfor use with non-IP phone/key system for voice and non PoE grade data switches (10/100/1000) for transmission of data</text_data><comment_date>2013-10-30T00:00:00</comment_date></row><row _id="row-qyv5_5sw7.3ud7" _uuid="00000000-0000-0000-F067-84C484BB045F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qyv5_5sw7.3ud7"><intent_id>979550</intent_id><project_id>880032</project_id><text_data>Fringe Breakdown:$7.20 Annuity$10.45 Pension$8.17 H &amp; W$2.10 PTO$.26 IMPACT$.70 Apprenticeship$.01 Industry</text_data><comment_date>2019-05-29T00:00:00</comment_date></row><row _id="row-vkcu.wsb9-z2zg" _uuid="00000000-0000-0000-9834-AAF207217D7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkcu.wsb9-z2zg"><intent_id>552256</intent_id><project_id>703185</project_id><text_data>TELECOMMUNICATION TECHNICHIAN WORKING ON TELECOMMUNICATION CABLING.</text_data><comment_date>2013-02-21T00:00:00</comment_date></row><row _id="row-dbdd~3h5n-futy" _uuid="00000000-0000-0000-3DE4-C9DE129F6596" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dbdd~3h5n-futy"><intent_id>492864</intent_id><project_id>679669</project_id><text_data>Intent to cover jobs in 2011 per agreement with Bea Hart.</text_data><comment_date>2011-12-09T00:00:00</comment_date></row><row _id="row-gc4j-qh8q-kypi" _uuid="00000000-0000-0000-608E-05B235C45824" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gc4j-qh8q-kypi"><intent_id>959712</intent_id><project_id>872946</project_id><text_data>Service Work</text_data><comment_date>2019-02-11T00:00:00</comment_date></row><row _id="row-pake_wznt-k8hv" _uuid="00000000-0000-0000-1A87-2735E77D926F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pake_wznt-k8hv"><intent_id>1366337</intent_id><project_id>1088746</project_id><text_data>9918065</text_data><comment_date>2023-09-23T00:00:00</comment_date></row><row _id="row-qhqx~c3p9_rpge" _uuid="00000000-0000-0000-C711-BDBE07EBDF13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qhqx~c3p9_rpge"><intent_id>584926</intent_id><project_id>716774</project_id><text_data>This is a JOC filing on an individual job order under Centennial Contractors Ent., Inc.</text_data><comment_date>2013-08-01T00:00:00</comment_date></row><row _id="row-89sg-wq38_tx2s" _uuid="00000000-0000-0000-6E3E-23C712D9B1F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89sg-wq38_tx2s"><intent_id>971674</intent_id><project_id>877930</project_id><text_data>FILED BY TRACEY FREEMAN</text_data><comment_date>2019-04-15T00:00:00</comment_date></row><row _id="row-p2c8~7y7v-e9u5" _uuid="00000000-0000-0000-1E7F-6272E928CF89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p2c8~7y7v-e9u5"><intent_id>833050</intent_id><project_id>820752</project_id><text_data>1)Christie Mainline, station 11+45, replace existing gate. 2)Christie Spur, station 6+00, install new gate. Located near property boundary between state and adjacent landowner.3)Mundt Creek Mainline, station 1+75, replace existing gate.4)Hawk Ridge Mainline, station 0+67, replace existing gate.</text_data><comment_date>2017-05-23T00:00:00</comment_date></row><row _id="row-atyy.xnbg_zpwf" _uuid="00000000-0000-0000-71C5-5A3C4126C86D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-atyy.xnbg_zpwf"><intent_id>926154</intent_id><project_id>858912</project_id><text_data>Blairco Job 18-7874#1-Install ductless heat pump system.#2-Manufactured Home#3-One#4-a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no l)no#5-Yes#6-Yes#7-Unknown#8-No</text_data><comment_date>2018-08-16T00:00:00</comment_date></row><row _id="row-caqw~6ybg.wufp" _uuid="00000000-0000-0000-098F-3BFC39D9C8FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-caqw~6ybg.wufp"><intent_id>1098344</intent_id><project_id>937452</project_id><text_data>WO #'s 389139 &amp; 387049</text_data><comment_date>2020-10-23T00:00:00</comment_date></row><row _id="row-45bu-5e2f.2png" _uuid="00000000-0000-0000-2E0B-B538A10D8DAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-45bu-5e2f.2png"><intent_id>545144</intent_id><project_id>700154</project_id><text_data>Good Morning Reasa, Thank you for your help correcting intent for Kateri House. Please add following language to intent listed below and re-approve. Intent ID # 545144 Language to add:  &amp;quot;Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101  Workers will be paid in accordance with Davis Bacon Wage requirements for the following crafts/trade/occupations&amp;quot; Best, PamelaVela Brothers, Inc.Energy Efficiency SpecialistOffice (425) 483-8532Fax (425) 485-7799</text_data><comment_date>2012-12-10T00:00:00</comment_date></row><row _id="row-v34z~abmr-ufxc" _uuid="00000000-0000-0000-49F0-3CB219566160" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v34z~abmr-ufxc"><intent_id>1021240</intent_id><project_id>899270</project_id><text_data>#1 � The crew will be installing a new furnace and heat pump water heater, installing an ERV and new bathroom fans and replacing the panel#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2019-11-12T00:00:00</comment_date></row><row _id="row-ud59.px4x_59he" _uuid="00000000-0000-0000-330E-3473FBCB3673" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ud59.px4x_59he"><intent_id>1001679</intent_id><project_id>891065</project_id><text_data>FILED BY MARK SOKOLI</text_data><comment_date>2019-08-22T00:00:00</comment_date></row><row _id="row-dzke.qmyw~uiaw" _uuid="00000000-0000-0000-2BDA-CBC67C204C54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dzke.qmyw~uiaw"><intent_id>1030049</intent_id><project_id>903690</project_id><text_data>Remove 4 trees, stump grind, remove all debris off site.Remove shrub and haul debris away.</text_data><comment_date>2020-01-06T00:00:00</comment_date></row><row _id="row-4z2a_cgmw-q87b" _uuid="00000000-0000-0000-D123-6924EDCB0FF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4z2a_cgmw-q87b"><intent_id>982463</intent_id><project_id>883159</project_id><text_data>Telecom Tech: Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2019-06-05T00:00:00</comment_date></row><row _id="row-cvus~e4pb_a7xy" _uuid="00000000-0000-0000-C530-5A17B3963F02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cvus~e4pb_a7xy"><intent_id>606888</intent_id><project_id>593696</project_id><text_data>I AM A OWNER OPERATOR I DO NOT HAVE ANY INPLOYES AND DO NOT INTEND TO HIRE ANY I HAUL SAND AND GRAVEL</text_data><comment_date>2013-12-03T00:00:00</comment_date></row><row _id="row-9bxg.4xkh-bg3v" _uuid="00000000-0000-0000-9B13-980904BDF2B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9bxg.4xkh-bg3v"><intent_id>1279268</intent_id><project_id>1037877</project_id><text_data>Decatur Dr., Ferndale, WA 982481. Air seal, attic blow, duct seal, belly blow, mechanical ventilation   2. Single family     3. 1     4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No    5. Yes     6. Yes     7. No     8. No</text_data><comment_date>2022-11-01T00:00:00</comment_date></row><row _id="row-9m3y_7gak.ghfv" _uuid="00000000-0000-0000-E3FC-5D945BC03181" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9m3y_7gak.ghfv"><intent_id>629353</intent_id><project_id>734851</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.   Electric furnace replacement.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?   Single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? SFR(a) Any commercial use in the structure? no(b) (b) Any retail use in the structure? no(c) (c) Permanent residence only? yes(d) (d) Rehabilitation house? no(e)  (e) Transitional housing? no(f) (f) Communal dining facility? no(g)  (g) Treatment services? no(h) (h) Dormitories? no(i) (i) Counseling? no(j) (j) Is each room and/or bed in the structure rented separately? N/a(k) (k) Other? no#5 - Does each dwelling unit have its own self-contained kitchen? N/a#6 - Does each dwelling unit have its own bathroom?  N/a#7 - Is there a community facility or manager�s office on site? no#8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2014-05-13T00:00:00</comment_date></row><row _id="row-j4hv.7z3m-dv9k" _uuid="00000000-0000-0000-8930-D51000B34705" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j4hv.7z3m-dv9k"><intent_id>740080</intent_id><project_id>781953</project_id><text_data>Job # 8009353</text_data><comment_date>2016-01-05T00:00:00</comment_date></row><row _id="row-xpqh-ub6a.iuya" _uuid="00000000-0000-0000-3708-E5FFC2E51047" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xpqh-ub6a.iuya"><intent_id>1226966</intent_id><project_id>976332</project_id><text_data>Renegade and Meranto on this job.</text_data><comment_date>2022-04-20T00:00:00</comment_date></row><row _id="row-ghcc_rnz4_m2ak" _uuid="00000000-0000-0000-8B04-43E2B42D84DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ghcc_rnz4_m2ak"><intent_id>1238803</intent_id><project_id>1016226</project_id><text_data>� Provide and install the following at the Admin IDF:o 1 each 4� x 4� x 4� fire treated plywood back boardo 1 each 24� x 24� x 24� CubeIT plus lockable wall mount enclosure.o 2 each 48 port Cat6 patch panelso 60 each 1� blue Cat6 patch cableso 4 each 15� blue Cat6 patch cables� Re-locate existing network cabling to new wall mount enclosure.� Terminate existing network cabling onto new Cat6 patch panels.o Short network cabling will be extended via a Cat6 rated 110 block with legs mounted on the existing backboard.� Bond wall mount enclosure to AC grounding electrode with #6 THHN green insulated ground wire.</text_data><comment_date>2022-06-05T00:00:00</comment_date></row><row _id="row-catw_dbqz~6xzw" _uuid="00000000-0000-0000-9A65-1E5E15C6DEAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-catw_dbqz~6xzw"><intent_id>708144</intent_id><project_id>762345</project_id><text_data>We will be planting 1 gallon, 4&amp;quot; pots and 3&amp;#39; tall trees.  No irrigation, no grading. No heavy equipment.</text_data><comment_date>2015-07-17T00:00:00</comment_date></row><row _id="row-7h2d-vwte.dkhf" _uuid="00000000-0000-0000-3EE2-97D6C2938774" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7h2d-vwte.dkhf"><intent_id>933812</intent_id><project_id>823121</project_id><text_data>owner operater delivering asphalt</text_data><comment_date>2018-09-18T00:00:00</comment_date></row><row _id="row-nift_vps7-t2df" _uuid="00000000-0000-0000-66B6-DDA9D192AD4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nift_vps7-t2df"><intent_id>584658</intent_id><project_id>712248</project_id><text_data>Filed by Kim Powell</text_data><comment_date>2013-07-31T00:00:00</comment_date></row><row _id="row-afjy~49h3_2f4k" _uuid="00000000-0000-0000-8B37-EC4A221E5581" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-afjy~49h3_2f4k"><intent_id>921045</intent_id><project_id>856997</project_id><text_data>1) Install 4-zone ductless heat pump2) Single Family Dwelling 3) 14A) no4B) no4C) yes4d) no4e) no4f) no4g) no4h) no4i) no4j) no4k) no5) N/A6) N/A7) No8) No</text_data><comment_date>2018-07-26T00:00:00</comment_date></row><row _id="row-jh9c.gevx.acxj" _uuid="00000000-0000-0000-C381-5FA0A9C55E54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jh9c.gevx.acxj"><intent_id>821273</intent_id><project_id>812813</project_id><text_data>Filed by Marianne DillonProject is exempt from state prevailing wage requirements based on &amp;quot;The Housing Act of 1937 and CFR 965.101 workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades occupations&amp;quot;.</text_data><comment_date>2017-03-16T00:00:00</comment_date></row><row _id="row-jctd_ysu8~8b8p" _uuid="00000000-0000-0000-DA49-C1B795CCE79E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jctd_ysu8~8b8p"><intent_id>1002572</intent_id><project_id>891404</project_id><text_data>Filed by Michelle Lyons</text_data><comment_date>2019-08-26T00:00:00</comment_date></row><row _id="row-wdzz~7in4.qcp4" _uuid="00000000-0000-0000-653D-7AC5B5AA11B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wdzz~7in4.qcp4"><intent_id>708979</intent_id><project_id>767679</project_id><text_data>This is a beatification project and upgrade.  We will be installing a new sprinkler system with a maximum depth of installation of 24&amp;quot;.  We will use an mini excavator for this installation.  In addition, we will be installing trees, shrubs and sod.  Most of this work is done manually with a shovel.  We will be installing top soil in all of the disturbed areas.  That will be brought in with a dump truck delivery and spread with a skid steer.  The trees we are planting will be approximately 24&amp;quot;-30&amp;quot; in depth.  Those will be dug by hand or with a mini excavator.</text_data><comment_date>2015-07-22T00:00:00</comment_date></row><row _id="row-8k2h_juxg_sxt6" _uuid="00000000-0000-0000-3886-5246EB83397C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8k2h_juxg_sxt6"><intent_id>1265960</intent_id><project_id>918327</project_id><comment_date>2022-09-13T00:00:00</comment_date></row><row _id="row-zc75-v7h9_73kr" _uuid="00000000-0000-0000-3E3D-2C7B15F4C064" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zc75-v7h9_73kr"><intent_id>691718</intent_id><project_id>759578</project_id><text_data>Form filed by:  Todd Bosnick</text_data><comment_date>2015-04-29T00:00:00</comment_date></row><row _id="row-6tk7~m3un~g72h" _uuid="00000000-0000-0000-0FDC-8CA1CB1C3C3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6tk7~m3un~g72h"><intent_id>567788</intent_id><project_id>710231</project_id><text_data>Remove ivy along walk path in park.</text_data><comment_date>2013-05-03T00:00:00</comment_date></row><row _id="row-qrzu-47hk~9t77" _uuid="00000000-0000-0000-37B3-0A616F16E1A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qrzu-47hk~9t77"><intent_id>1267980</intent_id><project_id>1031772</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. General contract with CAC, windows, doors, insulation, ducts, floor repairs and ect.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have? Single story #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house?NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Assisted living services? NO (I) Dormitories? NO (j) Counseling? NO (k) Is each room and/or bed in the structure rented separately? NO (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? N/A #6 - Does each dwelling unit have its own bathroom? N/A #7 - Is there a community facility or manager�s office on site? N/A #8 - Is any part of the structure used by members of the public?NO</text_data><comment_date>2022-09-20T00:00:00</comment_date></row><row _id="row-inya~3evi~ifa9" _uuid="00000000-0000-0000-3E76-BEF41025EBDE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inya~3evi~ifa9"><intent_id>820265</intent_id><project_id>813349</project_id><text_data>1117012</text_data><comment_date>2017-03-10T00:00:00</comment_date></row><row _id="row-eej7_4vzu~uf87" _uuid="00000000-0000-0000-B153-37A71D467490" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eej7_4vzu~uf87"><intent_id>758638</intent_id><project_id>790457</project_id><text_data>1) Remove oil furnace, install gas furnace, piping &amp; ductwork. 2)Single family 3) 2 stories 4) a:no, b:no, c:yes, d:no, e:no, f:no, g:no, h:no, i:no, j:no, k:n/a 5)one kitchen, one family home 6) single family only 7) n/a 8) no</text_data><comment_date>2016-04-26T00:00:00</comment_date></row><row _id="row-kkri~gyqx_krsa" _uuid="00000000-0000-0000-2DAE-ABE995DFAEE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kkri~gyqx_krsa"><intent_id>751636</intent_id><project_id>727771</project_id><text_data>JCI Project Number 4088-0141, Subcontract is E C Company</text_data><comment_date>2016-03-16T00:00:00</comment_date></row><row _id="row-vqc7_4af4.3cxg" _uuid="00000000-0000-0000-5113-B08D9BD54ACE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vqc7_4af4.3cxg"><intent_id>892206</intent_id><project_id>845534</project_id><text_data>WO #8033987</text_data><comment_date>2018-03-12T00:00:00</comment_date></row><row _id="row-82sh.zc37_476z" _uuid="00000000-0000-0000-2489-6C98A59EFBDC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-82sh.zc37_476z"><intent_id>915242</intent_id><project_id>850873</project_id><text_data>We will be providing new seeding fertilizing mulching, topsoil, bark wood chip mulch, and new plantings on the job site</text_data><comment_date>2018-07-02T00:00:00</comment_date></row><row _id="row-82v9~b4cg.x92b" _uuid="00000000-0000-0000-62AA-356976C93A2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-82v9~b4cg.x92b"><intent_id>981212</intent_id><project_id>882606</project_id><text_data>1) Hot water tank install. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f) No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) No. 8) No.</text_data><comment_date>2019-05-30T00:00:00</comment_date></row><row _id="row-yxvw.2uk6-jj7s" _uuid="00000000-0000-0000-961C-0CBB13778C63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yxvw.2uk6-jj7s"><intent_id>1099077</intent_id><project_id>922935</project_id><text_data>Desert Green Turf will only be delivering the sod/turf and will hire a subcontractor for the installation.</text_data><comment_date>2020-10-27T00:00:00</comment_date></row><row _id="row-yqak_rtfd_9nbp" _uuid="00000000-0000-0000-36EB-342091123201" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yqak_rtfd_9nbp"><intent_id>1125373</intent_id><project_id>947147</project_id><text_data>Sub   JCI FP #  650046185 Hired by Sub  KNOBELS ELECTRIC  PO#      1837A</text_data><comment_date>2021-02-26T00:00:00</comment_date></row><row _id="row-83hr_ecdb_bfau" _uuid="00000000-0000-0000-6093-0BEF7EEE8E13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-83hr_ecdb_bfau"><intent_id>997958</intent_id><project_id>885923</project_id><text_data>03190319056</text_data><comment_date>2019-08-08T00:00:00</comment_date></row><row _id="row-uchu~d3vs.dray" _uuid="00000000-0000-0000-8789-CFD871A263CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uchu~d3vs.dray"><intent_id>528411</intent_id><project_id>673032</project_id><text_data>There is no construction cleaning, our job is simply the janitorial one. We are wiping down the cabinets, vacuum the carpet, and cleanign the windows.</text_data><comment_date>2012-11-16T00:00:00</comment_date></row><row _id="row-pjhc.7579-gurj" _uuid="00000000-0000-0000-AAF3-043BC7A904AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjhc.7579-gurj"><intent_id>1366369</intent_id><project_id>1088755</project_id><text_data>9915635</text_data><comment_date>2023-09-23T00:00:00</comment_date></row><row _id="row-wf5r-fqq2.nn6c" _uuid="00000000-0000-0000-5C44-D7F0FEEEC901" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wf5r-fqq2.nn6c"><intent_id>482499</intent_id><project_id>666837</project_id><text_data>We have approved your form; however, in the future we will need the purpose of the truck in relation to the project - along with the information on type and size. This information is necessary in order to ascertain the correct trade classification(s) are used. Thank you. (chrr235)</text_data><comment_date>2011-10-21T00:00:00</comment_date></row><row _id="row-rqk7.zjiy~jd82" _uuid="00000000-0000-0000-923D-01692E932CC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rqk7.zjiy~jd82"><intent_id>1259734</intent_id><project_id>1027411</project_id><text_data>SR52860856</text_data><comment_date>2022-08-19T00:00:00</comment_date></row><row _id="row-krh8-xmfm.9xm6" _uuid="00000000-0000-0000-40F2-E7AC3732C4F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-krh8-xmfm.9xm6"><intent_id>786616</intent_id><project_id>797616</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2016-09-22T00:00:00</comment_date></row><row _id="row-nbu7_syuh-ep6i" _uuid="00000000-0000-0000-EF03-D89CD50165E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nbu7_syuh-ep6i"><intent_id>471743</intent_id><project_id>663748</project_id><text_data>GARCO CONSTRUCTION HIRED US</text_data><comment_date>2011-08-11T00:00:00</comment_date></row><row _id="row-tsat_stjs.im84" _uuid="00000000-0000-0000-8FC2-43BB9131CFB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsat_stjs.im84"><intent_id>504036</intent_id><project_id>683692</project_id><text_data>#1 Duplex#2 3 stories (2 stories &amp; basement)#3A Yes #3B No#3C No#3D No#3E No#3F No#3G No#4 Yes#5 Yes#6 No#7 No</text_data><comment_date>2012-03-20T00:00:00</comment_date></row><row _id="row-cz83-pf5y.4agr" _uuid="00000000-0000-0000-D686-8540ED7F2928" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cz83-pf5y.4agr"><intent_id>478634</intent_id><project_id>666148</project_id><text_data>I am owner operator. I will have one apprentice working directly with me.</text_data><comment_date>2011-10-14T00:00:00</comment_date></row><row _id="row-jih2.96ny_rzc8" _uuid="00000000-0000-0000-8095-A46EB35A3288" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jih2.96ny_rzc8"><intent_id>1150973</intent_id><project_id>890637</project_id><text_data>PR42005 - F200 Federal Way Link Extension</text_data><comment_date>2021-06-09T00:00:00</comment_date></row><row _id="row-cv82_jw9s-z2ya" _uuid="00000000-0000-0000-612B-7D2EFD5AD32A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cv82_jw9s-z2ya"><intent_id>802341</intent_id><project_id>807654</project_id><text_data>Emergency Sewage Backup Services</text_data><comment_date>2016-11-18T00:00:00</comment_date></row><row _id="row-2ds7-sp8z~k33i" _uuid="00000000-0000-0000-752E-34449D75A275" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ds7-sp8z~k33i"><intent_id>1469210</intent_id><project_id>1146384</project_id><text_data>Correction for Intent#1397430</text_data><comment_date>2024-09-23T00:00:00</comment_date></row><row _id="row-54nw-qut6.r8dm" _uuid="00000000-0000-0000-E8D3-07EA7E2919D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-54nw-qut6.r8dm"><intent_id>1518959</intent_id><project_id>1161159</project_id><text_data>Actual fringe rate will vary based on employee.</text_data><comment_date>2025-03-18T00:00:00</comment_date></row><row _id="row-3bfb~dgk8~r78g" _uuid="00000000-0000-0000-75CD-7FFD3C90E085" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bfb~dgk8~r78g"><intent_id>1528948</intent_id><project_id>1182047</project_id><text_data>INTERNAL TELECOM WIRING</text_data><comment_date>2025-04-21T00:00:00</comment_date></row><row _id="row-3m8g~h3n9.8v2g" _uuid="00000000-0000-0000-958B-D1905DB16AB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3m8g~h3n9.8v2g"><intent_id>657384</intent_id><project_id>745451</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2014-09-29T00:00:00</comment_date></row><row _id="row-95vh~cxzc_amy8" _uuid="00000000-0000-0000-2481-77266B47E047" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-95vh~cxzc_amy8"><intent_id>797720</intent_id><project_id>805646</project_id><text_data>WO #9301220 Job # 108169-001</text_data><comment_date>2016-10-25T00:00:00</comment_date></row><row _id="row-km47-ez2p_hpss" _uuid="00000000-0000-0000-8A0D-BD1DE1B55FE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-km47-ez2p_hpss"><intent_id>1234898</intent_id><project_id>977065</project_id><text_data>Stoneway Concrete is a Material Supplier</text_data><comment_date>2022-05-19T00:00:00</comment_date></row><row _id="row-3nkd~aqqw-858r" _uuid="00000000-0000-0000-F80A-2A2EA164D8EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3nkd~aqqw-858r"><intent_id>969018</intent_id><project_id>877320</project_id><text_data>Annual Recurring Contract Intent renewal Work includes but is not limited to, mowing, weed eating, hard edging, line edging, fertilization, pruning, sprinkler shutdown/startup (no irrigation service), debris removal, pressure washing, plant shrubs, plant/prune trees (height limit 12'), plant/prune groundcover, replace/install bark and gravel, monitoring and reporting on exterior pests, and remedial cleanup. Additional payment will not be made for field verifications that could have been detected prior to submitting a bid. There may be times extra work is needed for other duties as assigned.</text_data><comment_date>2019-04-02T00:00:00</comment_date></row><row _id="row-7px6-pysq.nuwz" _uuid="00000000-0000-0000-76EF-1BF9CB85996C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7px6-pysq.nuwz"><intent_id>896258</intent_id><project_id>847318</project_id><text_data>Filed by Luke Miller</text_data><comment_date>2018-04-02T00:00:00</comment_date></row><row _id="row-q9p5~353v.iezm" _uuid="00000000-0000-0000-DCA6-7B8E7263EE32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9p5~353v.iezm"><intent_id>1156699</intent_id><project_id>922411</project_id><text_data>Vacation: Vacation (rate of $1.00)Dues: Carpenters Western Washington (rate of $1.88)H.W.: Health and Security (rate of $8.51)Pension:	Retirement (rate of $8.60)Appr: Apprentice training (rate of $0.91)</text_data><comment_date>2021-07-15T00:00:00</comment_date></row><row _id="row-66ik.xsmx-j6b3" _uuid="00000000-0000-0000-8168-2CEC8C2288F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-66ik.xsmx-j6b3"><intent_id>606580</intent_id><project_id>721097</project_id><text_data>Filed by Pete Arsenault</text_data><comment_date>2013-11-27T00:00:00</comment_date></row><row _id="row-gcxg.rez7-dptj" _uuid="00000000-0000-0000-B1E6-B86977E0AB45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcxg.rez7-dptj"><intent_id>1099407</intent_id><project_id>929349</project_id><text_data>LEI#653520</text_data><comment_date>2020-10-28T00:00:00</comment_date></row><row _id="row-dkvd_qu3t_5u4z" _uuid="00000000-0000-0000-65E5-8BBAB22EA67E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dkvd_qu3t_5u4z"><intent_id>687340</intent_id><project_id>750693</project_id><text_data>Please see revised Fringe.  .76 medical.  All other wages paid in cash.</text_data><comment_date>2015-04-08T00:00:00</comment_date></row><row _id="row-jt9c-epzs~arww" _uuid="00000000-0000-0000-9310-5782D2ED8251" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jt9c-epzs~arww"><intent_id>692192</intent_id><project_id>760103</project_id><text_data>Insulation, Single Family, Two Story, NO, No, Yes, No, No, No, No, No, No, No, No,Yes, Yes, No, No</text_data><comment_date>2015-05-01T00:00:00</comment_date></row><row _id="row-488b~efc7_h8k3" _uuid="00000000-0000-0000-6752-10042C48B039" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-488b~efc7_h8k3"><intent_id>823800</intent_id><project_id>816964</project_id><text_data>Filed by Andy Higley</text_data><comment_date>2017-03-30T00:00:00</comment_date></row><row _id="row-wugc_y5qv~uf2q" _uuid="00000000-0000-0000-E6DD-1D654768464E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wugc_y5qv~uf2q"><intent_id>514847</intent_id><project_id>686532</project_id><text_data>I had listed the trade of fence erector to be used when installing the silt fence.  Landscape Laborer will only be used when planting and landscaping.</text_data><comment_date>2012-06-08T00:00:00</comment_date></row><row _id="row-rh5j-5p8c-ubeu" _uuid="00000000-0000-0000-19E9-6DB2A827EC2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rh5j-5p8c-ubeu"><intent_id>752808</intent_id><project_id>787888</project_id><text_data>Job # 8010282</text_data><comment_date>2016-03-23T00:00:00</comment_date></row><row _id="row-htd3~i3uf-b6vr" _uuid="00000000-0000-0000-5231-3CFC33694F84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-htd3~i3uf-b6vr"><intent_id>1188550</intent_id><project_id>985379</project_id><text_data>Laborer Fringes$7.20 - Health &amp; Security$5.04 - Pension $0.95 - Apprenticeship Training/Retraining$0.06 - WCISAP$0.14 - NWLECET$13.39 - TotalOperator Fringes$6.97 - Health &amp; Security$13.65 - Pension$2.00 - Supplemental Pension$0.70 - Apprenticeship/Training$0.05 - National Apprenticeship$23.37 - Total</text_data><comment_date>2021-11-03T00:00:00</comment_date></row><row _id="row-bbpe.bz5z-awut" _uuid="00000000-0000-0000-B51D-455473492BDB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bbpe.bz5z-awut"><intent_id>811049</intent_id><project_id>808790</project_id><text_data>General Laborer: Laborer Foreman/Supervisor (Laborers Union)Other Trucks: Lowbed - Mobilization of equipment (Teamsters Union)</text_data><comment_date>2017-01-12T00:00:00</comment_date></row><row _id="row-u629.gr7x-9k24" _uuid="00000000-0000-0000-921E-7A3471F0C5DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u629.gr7x-9k24"><intent_id>950911</intent_id><project_id>854361</project_id><text_data>Filed by Bridget OlsonProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2018-12-14T00:00:00</comment_date></row><row _id="row-eqdx-2ub6_7fyw" _uuid="00000000-0000-0000-ECFE-F3248A92BA9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eqdx-2ub6_7fyw"><intent_id>1126922</intent_id><project_id>952809</project_id><text_data>Fringe Benefit Breakdown$16.05 = $7.90 (Pension); $7.65 (Health &amp; Wellness); $0.50 (Apprenticeship)$22.07 = $13.51 (Pension); $7.75 (Health &amp; Wellness); $0.81 (Apprenticeship)</text_data><comment_date>2021-03-05T00:00:00</comment_date></row><row _id="row-8kvb~s44g_rbq3" _uuid="00000000-0000-0000-DC85-0172B05E6F6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8kvb~s44g_rbq3"><intent_id>1095150</intent_id><project_id>935927</project_id><text_data>LONG Job # 5020.200380</text_data><comment_date>2020-10-12T00:00:00</comment_date></row><row _id="row-zng8.vg36.fxri" _uuid="00000000-0000-0000-DE08-B681D8075465" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zng8.vg36.fxri"><intent_id>974148</intent_id><project_id>879561</project_id><text_data>OTHER TRUCKS= Lowboy</text_data><comment_date>2019-04-26T00:00:00</comment_date></row><row _id="row-mybv~nrrv_jzkn" _uuid="00000000-0000-0000-ADC2-3278682ED997" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mybv~nrrv_jzkn"><intent_id>736142</intent_id><project_id>780063</project_id><text_data>Jeremy Baxley is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height. The home is not open to the public and does not have a business. The electricians will be installing bathroom fan. This job meets the residential job requirements.</text_data><comment_date>2015-12-04T00:00:00</comment_date></row><row _id="row-bg4w-u7ri_qyu9" _uuid="00000000-0000-0000-477D-9E4203819BCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bg4w-u7ri_qyu9"><intent_id>720147</intent_id><project_id>772151</project_id><text_data>Install voice and data cable inside bldg for work station data systems and phone system.</text_data><comment_date>2015-09-11T00:00:00</comment_date></row><row _id="row-pppj.xdsm_5n5m" _uuid="00000000-0000-0000-BA84-C222D1BA7D46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pppj.xdsm_5n5m"><intent_id>543866</intent_id><project_id>697577</project_id><text_data>Other truck equals low boy to haul equipment</text_data><comment_date>2012-11-09T00:00:00</comment_date></row><row _id="row-s3bm_thjw_nwpb" _uuid="00000000-0000-0000-99C8-CE17B4327135" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s3bm_thjw_nwpb"><intent_id>1366368</intent_id><project_id>1088754</project_id><text_data>9919946</text_data><comment_date>2023-09-23T00:00:00</comment_date></row><row _id="row-e2hz.8zyv_t3f9" _uuid="00000000-0000-0000-7824-6CEC21A54EAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e2hz.8zyv_t3f9"><intent_id>786214</intent_id><project_id>759318</project_id><text_data>Labor Ready is a temporary labor service provider and is therefore exempt from the requirement to obtain a contractors license.</text_data><comment_date>2016-08-30T00:00:00</comment_date></row><row _id="row-xapy.zea6-tc2v" _uuid="00000000-0000-0000-A5E5-0FDEBE332872" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xapy.zea6-tc2v"><intent_id>1010378</intent_id><project_id>894533</project_id><text_data>PROVIDE AND INSTALL [2] NEW DATA TO OFFICE ON 4TH FLOOR AND [2] NEW DATA TO LOCATION ON 5TH FLOOR. PROVIDE CUTIN AND MUDRING AS NECESSARY.</text_data><comment_date>2019-09-26T00:00:00</comment_date></row><row _id="row-bjrh_2chb_4r6j" _uuid="00000000-0000-0000-843E-119011DC196A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjrh_2chb_4r6j"><intent_id>463505</intent_id><project_id>667978</project_id><text_data>Installation of  Rock garden including 18&amp;quot; deep pipe, 12&amp;quot; of topsoil; trees and shrubs. Soil to be installed with Bobcat and 700o lb excavator</text_data><comment_date>2011-07-27T00:00:00</comment_date></row><row _id="row-56gg_teww-nv2q" _uuid="00000000-0000-0000-DE1D-892B73157D1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-56gg_teww-nv2q"><intent_id>1086499</intent_id><project_id>931956</project_id><text_data>Low income single family residence insulation-weatherization upgrade</text_data><comment_date>2020-09-08T00:00:00</comment_date></row><row _id="row-6mvi.k8h8_i4yc" _uuid="00000000-0000-0000-42D1-ACC004BABD78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6mvi.k8h8_i4yc"><intent_id>1182756</intent_id><project_id>978969</project_id><text_data>PAVEMENT SURFACE IS SELF PERFORMING ALL THE WORK DESCRIBED THERE ARE NO OTHER CONTRACTORS INVOLVED IN THE WORK BEING PERFORMED.LABORER IS BLOWING OUT CRACKS IN THE RAOD WAY AND APPLYING HOT LIQUID RUBBER INTO THE CRACKS. CONTACT DONNIE LANDSMAN AT (509)578-0808 IF YOU NEED MORE INFORMATION.</text_data><comment_date>2021-10-13T00:00:00</comment_date></row><row _id="row-baqt.zgq6~kmxh" _uuid="00000000-0000-0000-C940-6519ACB588B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-baqt.zgq6~kmxh"><intent_id>1208212</intent_id><project_id>997543</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. EMERGENCY HEAT REPAIR.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? SINGLE FAMILY#3 - Including any basement or garage, how many stories or levels does the structure have? ONE#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(I) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO(l) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2022-01-31T00:00:00</comment_date></row><row _id="row-j8k5~et4t~ybmm" _uuid="00000000-0000-0000-55B7-3A6A1C181323" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j8k5~et4t~ybmm"><intent_id>1110082</intent_id><project_id>943669</project_id><text_data>303374</text_data><comment_date>2020-12-15T00:00:00</comment_date></row><row _id="row-mrqs~ei2y-crji" _uuid="00000000-0000-0000-7E70-104C2A1E8F51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrqs~ei2y-crji"><intent_id>696974</intent_id><project_id>763334</project_id><text_data>Spink Engineering was in charge of the bids.  Owner will drive and operate dump truck and backhoe.  He will also be one of the cement finishers.</text_data><comment_date>2015-05-28T00:00:00</comment_date></row><row _id="row-vvfe_h2pi~y8we" _uuid="00000000-0000-0000-ECB9-9E1AD980C162" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vvfe_h2pi~y8we"><intent_id>609434</intent_id><project_id>704857</project_id><text_data>Written notice from Michael Hummel received with form:  Please be aware that Siemens did not hire a subcontractor to perform PW work on this job. I included an updated Intent form.  Thank you. Michael</text_data><comment_date>2013-12-31T00:00:00</comment_date></row><row _id="row-nhmf_wxwx-fp34" _uuid="00000000-0000-0000-04AF-C1178B711DCD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nhmf_wxwx-fp34"><intent_id>702710</intent_id><project_id>765641</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2015-06-23T00:00:00</comment_date></row><row _id="row-tzzg.z4js-3rr2" _uuid="00000000-0000-0000-10A7-C5822FCC9717" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzzg.z4js-3rr2"><intent_id>940776</intent_id><project_id>864445</project_id><text_data>Clean and change out ductingHaz Waste worker to clean out ducting using rags/spongesSheetmetal worker to replace ducting using small hand tools, drill/screw driver</text_data><comment_date>2018-10-19T00:00:00</comment_date></row><row _id="row-qkij-rtt2.sum7" _uuid="00000000-0000-0000-92F1-9B009DF705E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qkij-rtt2.sum7"><intent_id>673303</intent_id><project_id>752426</project_id><text_data>PotholingMotorPat Grader to vacuum dirt to make hole for new Power Pole</text_data><comment_date>2015-01-13T00:00:00</comment_date></row><row _id="row-6c28_abiy-xgi3" _uuid="00000000-0000-0000-CDC1-1030EEDD75A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6c28_abiy-xgi3"><intent_id>613203</intent_id><project_id>721416</project_id><text_data>Form filed by: Linda Burke</text_data><comment_date>2014-01-22T00:00:00</comment_date></row><row _id="row-i5d7.ugn3_56h5" _uuid="00000000-0000-0000-9F2D-43E14E423D70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i5d7.ugn3_56h5"><intent_id>832425</intent_id><project_id>811976</project_id><text_data>HIRED BY L W SUNDSTROM</text_data><comment_date>2017-05-11T00:00:00</comment_date></row><row _id="row-6sbz.utc6~x5sm" _uuid="00000000-0000-0000-5647-347457E71CCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6sbz.utc6~x5sm"><intent_id>711798</intent_id><project_id>758226</project_id><text_data>Filed by Linda Burke</text_data><comment_date>2015-08-03T00:00:00</comment_date></row><row _id="row-if54~5zyc_t2yt" _uuid="00000000-0000-0000-297B-5C9CDFF077A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-if54~5zyc_t2yt"><intent_id>1038542</intent_id><project_id>908522</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2020-02-14T00:00:00</comment_date></row><row _id="row-6crq.55ja_75e6" _uuid="00000000-0000-0000-A227-AA4739135F2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6crq.55ja_75e6"><intent_id>839455</intent_id><project_id>823956</project_id><text_data>#1 Replace bath fan. #2 Single family dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2017-06-09T00:00:00</comment_date></row><row _id="row-q8nf.mxgj-2kkv" _uuid="00000000-0000-0000-11AE-DFDD691DB808" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8nf.mxgj-2kkv"><intent_id>1195000</intent_id><project_id>987940</project_id><text_data>Project is exempt from state prevailing wage requirements based on the housing act of 1937 and 24 CFR 965.101 workers will be paid n accordance with Davis bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2021-11-23T00:00:00</comment_date></row><row _id="row-r748.nw68~eqc4" _uuid="00000000-0000-0000-2616-D4146CF8949C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r748.nw68~eqc4"><intent_id>1172873</intent_id><project_id>958337</project_id><text_data>Herbicide treatment with backpack sprayer</text_data><comment_date>2021-08-26T00:00:00</comment_date></row><row _id="row-esnt.vzgn~2xgv" _uuid="00000000-0000-0000-DE79-0256EF971B65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-esnt.vzgn~2xgv"><intent_id>624131</intent_id><project_id>723820</project_id><text_data>Benefit breakdown: $7.55 health &amp; security, $8.40 pension, $.70 apprenticeship training/retraining - for a total of $16.65 as listed on SOI.</text_data><comment_date>2014-04-18T00:00:00</comment_date></row><row _id="row-mrfp_2ky4.2r5a" _uuid="00000000-0000-0000-42D1-335262E8AE94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrfp_2ky4.2r5a"><intent_id>875267</intent_id><project_id>823979</project_id><text_data>Filed by Eddie D Ford</text_data><comment_date>2017-11-16T00:00:00</comment_date></row><row _id="row-is4b.pvjh~5r2t" _uuid="00000000-0000-0000-9E35-41E05C183213" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-is4b.pvjh~5r2t"><intent_id>1277452</intent_id><project_id>1036848</project_id><text_data>9900676</text_data><comment_date>2022-10-25T00:00:00</comment_date></row><row _id="row-k5ps~9rx4-cv48" _uuid="00000000-0000-0000-1944-4B48DCDDA84B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k5ps~9rx4-cv48"><intent_id>745449</intent_id><project_id>784503</project_id><text_data>Filed by Bradley S. King Jr</text_data><comment_date>2016-02-08T00:00:00</comment_date></row><row _id="row-xyjj-nzwr.sgwr" _uuid="00000000-0000-0000-E33F-D421DA05223A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xyjj-nzwr.sgwr"><intent_id>555964</intent_id><project_id>696224</project_id><text_data>Excerpt from email sent regarding the explanantion of work performed on this project:From: Christensen-Russell, Ramona (LNI) [mailto:CHRR235@lni.wa.gov] Sent: Wednesday, February 27, 2013 2:43 PMTo: Hummel, MichaelSubject: Intent ID 555964 / Dept. of Enterprise Services / Veteran's Home Retsil Please see the form below.  According to the name of the project, this work involved fire alarm upgrades (see green highlight).  According to the blue highlight in question 1 below, the specific purpose of the project work response was:  Provide software programming of the installation of 3 annunciators.  However, the explanation provided in response to question 3 is only related to HVAC commissioning (see yellow highlight).  Thus, the information provided by your firm is conflicting and we cannot process your form until accurate information is received. We must have your firm review the specifics of this project and provide the necessary information that will reflect the work that was contracted and the work that will be performed by your employees.</text_data><comment_date>2013-04-03T00:00:00</comment_date></row><row _id="row-cmiz-jxp6.ss8z" _uuid="00000000-0000-0000-F4BC-253E213B4F72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cmiz-jxp6.ss8z"><intent_id>1155734</intent_id><project_id>947762</project_id><text_data>OTHER TRUCKS=LOWBOYOTHER TRUCKS=WATER TRUCK</text_data><comment_date>2021-06-25T00:00:00</comment_date></row><row _id="row-4eea_tfak.gpru" _uuid="00000000-0000-0000-0550-050417F06F5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4eea_tfak.gpru"><intent_id>1239163</intent_id><project_id>1004065</project_id><text_data>Motor Patrol Grader = Vac Truck Operator</text_data><comment_date>2022-06-06T00:00:00</comment_date></row><row _id="row-4j2f-xagw_kfex" _uuid="00000000-0000-0000-8211-076BED124B48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4j2f-xagw_kfex"><intent_id>1152145</intent_id><project_id>966415</project_id><text_data>I cannot find the exact type of work.  This is the closest I could find.  The exact work is running network cabling in a building and terminating/labeling/testing those cables with keystone jacks and mounting them in a faceplate.  This work is all indoor.  We do not require any access to computers or any type of automated system for any programming.  The only machines we will use are the testers for making sure the cabling works.  Please help if there is a better classification that I can use.  Tom Bromet - Northwest Cable Company360-815-2200</text_data><comment_date>2021-06-14T00:00:00</comment_date></row><row _id="row-v8z8_g4iv~vfph" _uuid="00000000-0000-0000-FB3E-78E7EF1AC328" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8z8_g4iv~vfph"><intent_id>1247865</intent_id><project_id>1021292</project_id><text_data>206147-002,003</text_data><comment_date>2022-07-11T00:00:00</comment_date></row><row _id="row-cxi3~qdcq.7did" _uuid="00000000-0000-0000-F0F3-2484F675A108" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxi3~qdcq.7did"><intent_id>1071569</intent_id><project_id>887382</project_id><text_data>Project was from 5 days, June 22nd through June 26th 2020.</text_data><comment_date>2020-07-12T00:00:00</comment_date></row><row _id="row-xgyu.5f7s-j9nz" _uuid="00000000-0000-0000-C00D-B63A5A877259" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xgyu.5f7s-j9nz"><intent_id>873512</intent_id><project_id>833326</project_id><text_data>Filed by L. Rachael CoeRE: Delridge CC ADA Improvements ~ Contract WO# 2017-105~ Intent Exemption RequestPlease find enclosed our Intent to Pay Prevailing Wage exemption request for Centennial Contractors Ent Inc. for the project referenced above, along with the $40 filing fee.Below are questions and answers concerning our services utilizing underground locates using Ground-Penetrating Radar (GPR) imaging at this prevailing-wage project:1. What is the purpose of this project? To provide underground locates using ground-penetrating radar (GPR) imaging.2. Does the project entail the remodeling or new construction of a facility? No, we will only provide information of underground locates.3. If your firm is working upon a type of building system, what type of system was involved? We will only provide underground locates using GPR imaging.4. What specific tasks will your employees perform? They will only provide underground locates using GPR equipment.5. What, if any, tools will your employees use in the performance of those tasks? GPR Equipment: SIR 3000 Unit (manufactured by Geophysical Survey Systems, Inc)6. If your employees uses no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? No, they will only use the GPR equipment to provide information concerning underground locates.7. Will you hire any subcontractors for this project? NoThank you for your assistance! If you have any questions, please contact me at 425-445-7675 or at Rachael@SRImaging.com.L. Rachael CoeOffice Manager</text_data><comment_date>2017-11-07T00:00:00</comment_date></row><row _id="row-cima-pgv6~mwyn" _uuid="00000000-0000-0000-8B19-62A1206D23E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cima-pgv6~mwyn"><intent_id>601593</intent_id><project_id>720336</project_id><text_data>owner operated.</text_data><comment_date>2013-10-27T00:00:00</comment_date></row><row _id="row-b37p~9f7w-h2n4" _uuid="00000000-0000-0000-7DC7-0019A3835362" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b37p~9f7w-h2n4"><intent_id>871685</intent_id><project_id>769432</project_id><text_data>a) the entire scope of the project is restoration of the Cedar Hills Landfill.b) our portion of the project is to install hydroseed per specifications on designated and prepared area, using a hydroseed installation truck. Hydroseed is a one-step process.</text_data><comment_date>2017-10-27T00:00:00</comment_date></row><row _id="row-mzvt.e88h.qdw2" _uuid="00000000-0000-0000-C70D-E02DEC6452D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mzvt.e88h.qdw2"><intent_id>571443</intent_id><project_id>710650</project_id><text_data>Supply and install numerous trees and plants, bring in topsoil for planting areas to be spread with bobcat skid steer and by hand, bring in topsoil for all new lawn areas spread with bobcat skid steer, bring in sod to be installed by hand, bark/mulch brought in and spread by hand in all plant bed areas. Irrigation system installed at a depth no greater than 24&amp;quot;, trenching for such with trencher or mini excavator.</text_data><comment_date>2013-05-23T00:00:00</comment_date></row><row _id="row-4udx-dxi6-w9bg" _uuid="00000000-0000-0000-89D6-E4A558134E41" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4udx-dxi6-w9bg"><intent_id>922515</intent_id><project_id>856569</project_id><text_data>Installing irrigation, trench drains, plants and trees. We will install 2&amp;quot; of mulch.  We will use shovels and a mini excavator to trench for irrigation.</text_data><comment_date>2018-08-01T00:00:00</comment_date></row><row _id="row-kv7d_5877_8hh6" _uuid="00000000-0000-0000-4FF5-37A0EA0735E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kv7d_5877_8hh6"><intent_id>876977</intent_id><project_id>838280</project_id><text_data>Install 88 Category 6 data cables to 44 cubicle locations at 501 S. Jackson St. Seattle to support new call center modular furniture. Each location receives 2 cables and will be terminated on Cat6 ethernet jacks. Cable is pulled in overhead false ceiling spaces and run into modular furniture. The cable is run from the 3rd floor IDF room and terminated on patch panels located in 7� data racks.</text_data><comment_date>2017-11-30T00:00:00</comment_date></row><row _id="row-hf3r-brkp~94nq" _uuid="00000000-0000-0000-9A80-58DE221DDCF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hf3r-brkp~94nq"><intent_id>840351</intent_id><project_id>802455</project_id><text_data>7610 W nob hill blvd # 6yakima, washower valve is running non stop-replaced washers and diverter valve-resealed escusion plateschecked mainline-no leaks on main linechecked belly no water leaks found sewer leak at rear bathroomsingle familynot knownno no yes no no no no no no no no not a dwelling single family homesno no</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-qm86.4746_4biw" _uuid="00000000-0000-0000-94BC-9B6570CC6D1F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qm86.4746_4biw"><intent_id>860711</intent_id><project_id>831811</project_id><text_data>The first notes from 9/5 &amp; 9/28 are for Skyview JH.  At Maywood Elem - Scope is: Remove existing Multimode fiber and replace with Singlemode fiber to 7 IDFs. With the Singlemode fiber we will pull in 2 CAT6A tie cables for analog voice. Trench from vault 1 to portable P50. Install 3&amp;quot; sch80 PVC for pathway. Backfill and seal. Terminate and test Singlemode fiber at each location. Install new fiber enclosures. Terminate CAT6A 1 pair per port with provided patch panel. Work will be completed both indoors and outdoors.At Timbercrest JR HI - Scope: Remove Multimode fiber from 4 IDFs back to MDF. Replace with Singlemode fiber and 2 CAT6A cables. Terminate fiber and test. Install new fiber enclosures. Terminate CAT6A cable to existing patch panels 1 pair per port. Work will be completed both indoors and outdoors.</text_data><comment_date>2017-12-01T00:00:00</comment_date></row><row _id="row-g3zr-x3fk_ahtj" _uuid="00000000-0000-0000-02CF-A813B6DB20AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g3zr-x3fk_ahtj"><intent_id>549315</intent_id><project_id>701850</project_id><text_data>Form filed by: James McGinty</text_data><comment_date>2012-12-20T00:00:00</comment_date></row><row _id="row-immb-m99r.ycxp" _uuid="00000000-0000-0000-4553-B169C9E9F645" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-immb-m99r.ycxp"><intent_id>683199</intent_id><project_id>757379</project_id><text_data>This Intent and the subsequent affidavit to be filed after the Intent is accepted were postponed for resolution, just completed, of a similar project at the Issaquah School District&amp;#39;s Skyline HS.  We are conforming to LNI&amp;#39;s requested adjustment in the Prevailing Wage Classification.The employee received a bonus to comply with LNI&amp;#39;s prevailing wage requirement.</text_data><comment_date>2015-03-11T00:00:00</comment_date></row><row _id="row-k37u-8eq5.9hnn" _uuid="00000000-0000-0000-A372-E856E00A8663" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k37u-8eq5.9hnn"><intent_id>881037</intent_id><project_id>840327</project_id><text_data>Filed by Laura Kickbusch</text_data><comment_date>2017-12-28T00:00:00</comment_date></row><row _id="row-2uag~ambs.a7aj" _uuid="00000000-0000-0000-0D5A-42DDE730EACF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2uag~ambs.a7aj"><intent_id>1200049</intent_id><project_id>923129</project_id><text_data>Used hand tools to attach plastic bird netting to underside of play shed to keep birds from roosting on exposed beams.  Cordless drills used to screw into play shed.  hand P7 hog ring tool to attach net to clips installed with cordless drill.</text_data><comment_date>2022-02-07T00:00:00</comment_date></row><row _id="row-9c84.uayy.wv4s" _uuid="00000000-0000-0000-D293-9BC328C8862E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9c84.uayy.wv4s"><intent_id>899416</intent_id><project_id>847432</project_id><text_data>Irrigation installation</text_data><comment_date>2018-04-18T00:00:00</comment_date></row><row _id="row-88wr~3r3y.ix9i" _uuid="00000000-0000-0000-44E1-BC57447EF59D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-88wr~3r3y.ix9i"><intent_id>1249657</intent_id><project_id>1000854</project_id><text_data>1.install cell shades 2.single family cottage units 3. 1 story 4a. comm. bldg is considered comm. but no retail uses will take place b.no c.yes d. no e. yes f. yes g. no h.no i. no j. case mgmt provided to all residents on a volunteer basis k.yes L.no 5. yes 6. yes 7. yes common bldg 8. no</text_data><comment_date>2022-07-16T00:00:00</comment_date></row><row _id="row-fmsx.4mqb_zdbh" _uuid="00000000-0000-0000-4C01-5610D40835CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fmsx.4mqb_zdbh"><intent_id>861780</intent_id><project_id>832227</project_id><text_data>Scope of Work: Clean and inspect the Air Handler Fan, Check bearings, replace if needed then balance fan. This work is being done from our Moses Lake facility..</text_data><comment_date>2017-09-11T00:00:00</comment_date></row><row _id="row-cqx4.jft5-hhwd" _uuid="00000000-0000-0000-936A-6BC038F0D634" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqx4.jft5-hhwd"><intent_id>599240</intent_id><project_id>721954</project_id><text_data>Young 1915 F St 98225</text_data><comment_date>2013-10-14T00:00:00</comment_date></row><row _id="row-8zs2_evn8_jjax" _uuid="00000000-0000-0000-3BF2-7FD410C6A907" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zs2_evn8_jjax"><intent_id>725270</intent_id><project_id>774234</project_id><text_data>Industrial Insurance is with Idaho State Insurance Fund Policy #523384</text_data><comment_date>2015-10-08T00:00:00</comment_date></row><row _id="row-thvt.mniq~bab6" _uuid="00000000-0000-0000-B91D-7FB000662229" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thvt.mniq~bab6"><intent_id>916957</intent_id><project_id>847087</project_id><text_data>Russell Landscaping is responsible for repairing sod areas as needed around entire perimeter of project. We will use scissors and rakes to install sod where needed. 4&amp;quot; of top soil will be installed under the new sod using shovels and wheelbarrows. Russell Landscaping will be responsible for repairing the sprinklers as needed due to construction damage throughout the course of the project. No trenching will be necessary at this point to make necessary repairs.</text_data><comment_date>2018-07-10T00:00:00</comment_date></row><row _id="row-dvn4-spny~y8za" _uuid="00000000-0000-0000-86D6-C98FCDE87529" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dvn4-spny~y8za"><intent_id>997746</intent_id><project_id>889518</project_id><text_data>PROJECT IS EXEMPT FROM STATE PREVAILING WAGE REQUIREMENTS BASED ON THE HOUSING ACT OF 1937 AND 24 CFR 965,101. WORKERS WILL BE PAID IN ACCORDANCE WITH DAVIS BACON WAGE REQUIREMENTS FOR THE FOLLOWING CRAFTS/TRADES/OCCUPATIONS.</text_data><comment_date>2019-08-07T00:00:00</comment_date></row><row _id="row-xmqp.ur6x-xkmr" _uuid="00000000-0000-0000-A676-5C4458287C59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xmqp.ur6x-xkmr"><intent_id>744241</intent_id><project_id>783924</project_id><text_data>Disassemble Customer Supplied Blades with Wrenches, Sand Blast Parts in Sand Blasting machine, milling, braze, Silver Plate, &amp; Reassemble.  The blades were shipped in to our shop.</text_data><comment_date>2016-02-04T00:00:00</comment_date></row><row _id="row-ugjz.jyvk_cc83" _uuid="00000000-0000-0000-57BA-A27677D765FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ugjz.jyvk_cc83"><intent_id>576994</intent_id><project_id>713948</project_id><text_data>Removed selection of Pierce County. Work will only be performed in King County.</text_data><comment_date>2013-07-17T00:00:00</comment_date></row><row _id="row-4h2t_j6a6~dnjw" _uuid="00000000-0000-0000-B5EC-AE0B7F79766C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4h2t_j6a6~dnjw"><intent_id>880060</intent_id><project_id>839828</project_id><text_data>Manual control of weeds. Hand held small engine machinery (weed eater) only.</text_data><comment_date>2017-12-19T00:00:00</comment_date></row><row _id="row-428g-acj7.ch4e" _uuid="00000000-0000-0000-CEF2-2FCDC2745FB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-428g-acj7.ch4e"><intent_id>747967</intent_id><project_id>781269</project_id><text_data>Sona Seto610 N 14th StSelah, WA 98942#1 Install Bath fan &amp; J-boxes for open splices of old bedroom baseboard #2 Single Family dwelling #3 unknown story BLDG #4(a)no (b)no (c)yes (d)no (e)no (f)no (g)no (h)no (i)no (j)no(k)no #5 1 family dwelling kitchen #6 1 family dwelling bathroom #7 no places #8 no public use.</text_data><comment_date>2016-02-23T00:00:00</comment_date></row><row _id="row-4uyi~mee8.5xab" _uuid="00000000-0000-0000-D6DC-350F08D27BA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4uyi~mee8.5xab"><intent_id>491891</intent_id><project_id>679301</project_id><text_data>9215 N Five mile Rd Spokane Wa 99208 P.o A106 Amt.2000.08218 E Heroy Spokane WA.99207 P.o. A107 Amt.1000.004911 N florida #27 Spokane Wa 99271 P.o.A110  Amt.1000.001207 E Empire Spokane.Wa.99207 P.o. A108.Amt. 1000.00</text_data><comment_date>2011-12-04T00:00:00</comment_date></row><row _id="row-5iqq.edgp~gsc5" _uuid="00000000-0000-0000-3320-3A6432F00D30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5iqq.edgp~gsc5"><intent_id>850364</intent_id><project_id>828282</project_id><text_data>Tear down wall hung panels and worksurfaces, freestanding panels and worksurfaces, and take to storage. Re-Install all torn down product after repairs are made.</text_data><comment_date>2017-07-26T00:00:00</comment_date></row><row _id="row-2xnp_aa4c.kwde" _uuid="00000000-0000-0000-07DA-943866E6FDB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2xnp_aa4c.kwde"><intent_id>968690</intent_id><project_id>877188</project_id><text_data>From: Bridget Meidinger &amp;lt;jnrpaving@outlook.com&amp;gt; Sent: Wednesday, May 8, 2019 11:26 AMTo: LNI RE Prevailing Wage Worker 1 &amp;lt;PW1@LNI.WA.GOV&amp;gt;Subject: Intent Public RequestPlease post a note that Intent number 968690 contract number has changed to 2019-PW-24.Thank you.  Bridget MeidingerJNR Paving, Inc.29428 State Route 20Sedro Woolley, WA. 98284360-422-7363</text_data><comment_date>2019-05-10T00:00:00</comment_date></row><row _id="row-8i6p_85hn.vkxr" _uuid="00000000-0000-0000-61FE-371A4AF3355B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8i6p_85hn.vkxr"><intent_id>1074392</intent_id><project_id>925751</project_id><text_data>Granite job# 1030213TRUCKS - lowboy delivers asphalt rotomill to jobsite</text_data><comment_date>2020-07-22T00:00:00</comment_date></row><row _id="row-rx4k-wjku_cwu4" _uuid="00000000-0000-0000-2150-F2F9C783A70A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rx4k-wjku_cwu4"><intent_id>750766</intent_id><project_id>786951</project_id><text_data>CCE # 73370-0004</text_data><comment_date>2016-03-10T00:00:00</comment_date></row><row _id="row-7kd2~d6gs-i65f" _uuid="00000000-0000-0000-A135-9BFFD6C98F4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7kd2~d6gs-i65f"><intent_id>1070276</intent_id><project_id>923272</project_id><text_data>We subcontract owner/operator truck drivers to move modular classrooms using the truck drivers own truck. Classrooms load onto a modular trailer and are moved from one location to another.</text_data><comment_date>2020-07-07T00:00:00</comment_date></row><row _id="row-zfgi_qnis.u7sf" _uuid="00000000-0000-0000-6CB2-B7C94D3DE1DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zfgi_qnis.u7sf"><intent_id>853101</intent_id><project_id>827006</project_id><text_data>Filed by Randy Roosendaal</text_data><comment_date>2017-08-25T00:00:00</comment_date></row><row _id="row-8ri8~s5ks-tsjv" _uuid="00000000-0000-0000-D343-5D76E0A0E8F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ri8~s5ks-tsjv"><intent_id>961700</intent_id><project_id>855030</project_id><text_data>Tucci job# 359TRUCKS - lowboy delivers asphalt rotomill, sweeper driven to jobsite</text_data><comment_date>2019-02-22T00:00:00</comment_date></row><row _id="row-dv5s_a2gs-4pc2" _uuid="00000000-0000-0000-30FA-371D8FA142C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dv5s_a2gs-4pc2"><intent_id>1000477</intent_id><project_id>890608</project_id><text_data>Haz Waste workers to pack re-pack leaking drum using new drum and sorbents then dispose</text_data><comment_date>2019-08-19T00:00:00</comment_date></row><row _id="row-tb8w.d5qp~vnem" _uuid="00000000-0000-0000-249A-956C4B813E02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tb8w.d5qp~vnem"><intent_id>538937</intent_id><project_id>697027</project_id><text_data>022033</text_data><comment_date>2012-10-09T00:00:00</comment_date></row><row _id="row-uciq~e8u7~jsfn" _uuid="00000000-0000-0000-5B15-A91C5EE11D85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uciq~e8u7~jsfn"><intent_id>612230</intent_id><project_id>726872</project_id><text_data>Drywall, hang, tape, finish, prime, texture Prevailing Wage</text_data><comment_date>2014-01-15T00:00:00</comment_date></row><row _id="row-p4a4-6mwb-ygmf" _uuid="00000000-0000-0000-FE1F-06A96A0AAE6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4a4-6mwb-ygmf"><intent_id>960258</intent_id><project_id>873218</project_id><text_data>Employees drive either a 2500 or a 3500 Chevy Silverado to and from the job site. Ironworkers will install steel braces onto an existing antenna and re-align the MW path between the two sites with the other crew members. Supporting crew members (Classified as Ironworkers) will assist by hoisting material up the tower, providing radio communication and supporting with directions when needed.</text_data><comment_date>2019-02-14T00:00:00</comment_date></row><row _id="row-kmvs_8rkk-6b69" _uuid="00000000-0000-0000-7145-795CC5223022" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kmvs_8rkk-6b69"><intent_id>823963</intent_id><project_id>805495</project_id><text_data>So, how do I classify David?He owns Topper.But, he works as an employee on these jobs.He is not an exempt.We bid this job with the General Labor rate.We do not seem to fit into any other category.Topper built these docks a long time ago.This was a repair.We were a work crew.Everybody did the same things. There was no lead with helper.Everybody needs to be paid the same/ same job.There were Topper tire floats missing, deck fiber grating broken, composite rails damaged, lost hinge pins, UHMW wear plates repaired/ replaced.The docks were inspected and fixed.It was not complicated or involved.It was not a specialty repair.</text_data><comment_date>2017-04-10T00:00:00</comment_date></row><row _id="row-c94z_sxye.wtty" _uuid="00000000-0000-0000-E30B-A8687332EC52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c94z_sxye.wtty"><intent_id>1250549</intent_id><project_id>1022681</project_id><text_data>9897011</text_data><comment_date>2022-07-19T00:00:00</comment_date></row><row _id="row-624s.cxg2-va3r" _uuid="00000000-0000-0000-A062-C1647594CF60" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-624s.cxg2-va3r"><intent_id>688195</intent_id><project_id>752255</project_id><text_data>Hello Prevailing Wage Division, please be aware that our &amp;#39;Apprentice&amp;#39; Electronic Technician Wage rate is $14.00 and Fringe rate is $2.81.  Thank you, Michael</text_data><comment_date>2015-04-09T00:00:00</comment_date></row><row _id="row-mmf4_d6db_udth" _uuid="00000000-0000-0000-BA14-211C970D5244" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mmf4_d6db_udth"><intent_id>501408</intent_id><project_id>675428</project_id><text_data>04/11/2012  REVISION OF PAY RATES AND BENEFITS TO MORE NEARLY MATCH THE EMPLOYEES WHO DID THE WORK.IN SKAGIT COUNTY: PAY $21.05 ; BENEFITS: VACATION $0.75, HOLIDAY - $0.67, NO PENSION, INSURANCE $10.21, PERSONAL TIME $0.19 TOTAL $11.82,  . BASE PAY KING COUNTY - $24.07.</text_data><comment_date>2012-04-11T00:00:00</comment_date></row><row _id="row-zsi5~cjna-9mvg" _uuid="00000000-0000-0000-CB83-D5A66A616805" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zsi5~cjna-9mvg"><intent_id>490703</intent_id><project_id>678839</project_id><text_data>The scope of work for this project is to install wireless AP's for voice and data network infrastructure.</text_data><comment_date>2011-11-23T00:00:00</comment_date></row><row _id="row-uvkz-45h6~c3td" _uuid="00000000-0000-0000-7DF7-D94BA43A56EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uvkz-45h6~c3td"><intent_id>582970</intent_id><project_id>716090</project_id><text_data>The scope for this project is cut the UW's fiber from joint splice case, re-route/re-splice fiber for the UW only</text_data><comment_date>2013-07-23T00:00:00</comment_date></row><row _id="row-vn2z~6khy~tpdu" _uuid="00000000-0000-0000-F5ED-D3AD14D6F330" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vn2z~6khy~tpdu"><intent_id>1220621</intent_id><project_id>1005368</project_id><text_data>Snake Sink Line</text_data><comment_date>2022-03-24T00:00:00</comment_date></row><row _id="row-85zi-yp2z.baba" _uuid="00000000-0000-0000-2C37-57A3E185EE0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-85zi-yp2z.baba"><intent_id>581876</intent_id><project_id>707168</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR DRIVER - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH OIL/TACK PRIOR TO PLACING ASPHALT</text_data><comment_date>2013-07-18T00:00:00</comment_date></row><row _id="row-ifxm_n5ha~3fnn" _uuid="00000000-0000-0000-CCDE-9036D886E437" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ifxm_n5ha~3fnn"><intent_id>1219315</intent_id><project_id>1004560</project_id><text_data>INV # 88478830 SR # 51502914</text_data><comment_date>2022-03-21T00:00:00</comment_date></row><row _id="row-5qyt_fahz.by8j" _uuid="00000000-0000-0000-6CFA-EBD645E06DAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5qyt_fahz.by8j"><intent_id>671343</intent_id><project_id>751479</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.   HVAC replacement.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?   Single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? SFR(a) Any commercial use in the structure? no(b) (b) Any retail use in the structure? no(c) (c) Permanent residence only? yes(d) (d) Rehabilitation house? no(e)  (e) Transitional housing? no(f) (f) Communal dining facility? no(g)  (g) Treatment services? no(h) (h) Dormitories? no(i) (i) Counseling? no(j) (j) Is each room and/or bed in the structure rented separately? N/a(k) (k) Other? no#5 - Does each dwelling unit have its own self-contained kitchen? N/a#6 - Does each dwelling unit have its own bathroom?  N/a#7 - Is there a community facility or manager�s office on site? no#8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2014-12-29T00:00:00</comment_date></row><row _id="row-stsi.cztd-yupv" _uuid="00000000-0000-0000-9CCF-814C632049B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-stsi.cztd-yupv"><intent_id>1222588</intent_id><project_id>983674</project_id><text_data>Blythe job # Y913May include Sheet Metal Fabrication in Blythe Shop - Whatcom County, BellinghamMay include Pipe Welding/Fabrication in Blythe Shop - Whatcom County, Bellingham</text_data><comment_date>2022-04-01T00:00:00</comment_date></row><row _id="row-ds49~dv82-wf4a" _uuid="00000000-0000-0000-0C13-55D359EDB1CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ds49~dv82-wf4a"><intent_id>970458</intent_id><project_id>851159</project_id><text_data>1118141</text_data><comment_date>2019-04-09T00:00:00</comment_date></row><row _id="row-8n6d.qat3-35zh" _uuid="00000000-0000-0000-544E-6605E92F67FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8n6d.qat3-35zh"><intent_id>974552</intent_id><project_id>849247</project_id><text_data>Herbicide application to subgrade prior to paving. Broadcast method by truck mounted 5 horsepower sprayer. Some work will be hose and wand delivered by walking.</text_data><comment_date>2019-04-29T00:00:00</comment_date></row><row _id="row-z4fi_qfbe~j3s9" _uuid="00000000-0000-0000-BB10-C78354969CA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z4fi_qfbe~j3s9"><intent_id>1121548</intent_id><project_id>950116</project_id><text_data>#1- resurface tub #2-apartment #3-one level #4-(c) #5-yes #6-yes #7-unknown #8-unknown</text_data><comment_date>2021-02-10T00:00:00</comment_date></row><row _id="row-z3u4_pgmg.yasp" _uuid="00000000-0000-0000-C1FA-134115360142" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3u4_pgmg.yasp"><intent_id>1029957</intent_id><project_id>903652</project_id><text_data>#20708, Abbott, Ray, 5105 N Howard, Spokane</text_data><comment_date>2020-02-03T00:00:00</comment_date></row><row _id="row-f3ag.q2fs-9fvw" _uuid="00000000-0000-0000-A90E-04F3C8765559" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f3ag.q2fs-9fvw"><intent_id>1257459</intent_id><project_id>1026208</project_id><text_data>We have an Idaho worker's comp policy that covers our employees in Washington and Idaho. Policy# KWC1247355</text_data><comment_date>2022-08-12T00:00:00</comment_date></row><row _id="row-uqpk_jvte_c88p" _uuid="00000000-0000-0000-5E90-F66DF29A47FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uqpk_jvte_c88p"><intent_id>790928</intent_id><project_id>803076</project_id><text_data>Truck Driver: Type of Truck is an F250 with trailer for purposes of hauling debri, soil, asphalt,&amp; plants as needed.</text_data><comment_date>2016-09-30T00:00:00</comment_date></row><row _id="row-7wan.2wvc_dnr3" _uuid="00000000-0000-0000-59C1-BE96FF0A0A4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7wan.2wvc_dnr3"><intent_id>504764</intent_id><project_id>661000</project_id><text_data>Correct Hiring Contractor is Trucker&amp;#39;s Consortium LLC UBI 602688442 PO Box 22419 Seattle WA 98122</text_data><comment_date>2015-10-14T00:00:00</comment_date></row><row _id="row-bb7c_8xrt~djd2" _uuid="00000000-0000-0000-3711-4A769305378E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bb7c_8xrt~djd2"><intent_id>1151806</intent_id><project_id>908586</project_id><text_data>This is landscape maintenance work.</text_data><comment_date>2021-06-11T00:00:00</comment_date></row><row _id="row-wrua_sdsp-2zvi" _uuid="00000000-0000-0000-FF02-AF4EEF66E277" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wrua_sdsp-2zvi"><intent_id>899012</intent_id><project_id>848510</project_id><text_data>Please answer all the residential questions. Thank you. In order for us to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), please answer each of the following questions and resubmit your form: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?  Duplex  #3 - Including any basement or garage, how many stories or levels does the structure have?  Single level #4 - What is the building used for? Living residential--Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No (b) Any retail use in the structure? No (c) Permanent residence only? Yes(d) Rehabilitation house?No (e) Transitional housing? No(f) Communal dining facility? NO (g) Treatment services? NO (h) Assisted living services? NO (i) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO (l) Other services or uses? NO#5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public?NO</text_data><comment_date>2018-05-22T00:00:00</comment_date></row><row _id="row-vbxg.i869-n3nx" _uuid="00000000-0000-0000-D306-014DC0D0C90A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vbxg.i869-n3nx"><intent_id>929036</intent_id><project_id>845664</project_id><text_data>Fringe consists of $10.51 Medical and $8.06 Pension.</text_data><comment_date>2018-08-28T00:00:00</comment_date></row><row _id="row-t8xx~jevk-aykt" _uuid="00000000-0000-0000-131A-4AC0A9D6741F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t8xx~jevk-aykt"><intent_id>1416687</intent_id><project_id>1118713</project_id><text_data>NW PENSION          11.00     LOCAL APPR            1.10     HEALTH CARE / VEB          14.39     ORG TRUST            1.00     IND FUND            0.65     NATL PENSION            4.24     ITI/NEMI/SMOHI            0.17     NW SUPPLEMENTAL            0.79     CLEAN CARD            0.07           TOTAL          33.41               BT Journeyman</text_data><comment_date>2024-04-04T00:00:00</comment_date></row><row _id="row-k7bg.mmby~k4c2" _uuid="00000000-0000-0000-C54D-96D5B38846AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k7bg.mmby~k4c2"><intent_id>1469807</intent_id><project_id>1146699</project_id><text_data>WO# 254091 COB crossroads drainageInstall landscape drainage lines one foot deep with hand tools</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-vtb5_aa4v~yrti" _uuid="00000000-0000-0000-E16C-0B2F2D468E3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vtb5_aa4v~yrti"><intent_id>1465681</intent_id><project_id>1144613</project_id><text_data>1) Replacement of flooring, including demo and materials.2) Apartment Common Areas3)4) a) No b)No c)Yes d)</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-xu4g_zhrx_8tyc" _uuid="00000000-0000-0000-0257-B7869F565EF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xu4g_zhrx_8tyc"><intent_id>1469913</intent_id><project_id>1146759</project_id><text_data>40061312, INVOICE 940060891</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-6ifb-2w2c.ufes" _uuid="00000000-0000-0000-2F5F-90D31CB1961D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ifb-2w2c.ufes"><intent_id>1469824</intent_id><project_id>1139560</project_id><text_data>PR134883 Gilliam Creek Culvert</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-ntmy~kjss.9jkg" _uuid="00000000-0000-0000-AC62-E2F6F3EFCC28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ntmy~kjss.9jkg"><intent_id>1244296</intent_id><project_id>1019406</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form.On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-07-11T00:00:00</comment_date></row><row _id="row-euvf-87k7-yneu" _uuid="00000000-0000-0000-046A-3127CBEE1D75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-euvf-87k7-yneu"><intent_id>980555</intent_id><project_id>814572</project_id><text_data>HIRED BY BELARDE COMPANY INC.</text_data><comment_date>2019-05-28T00:00:00</comment_date></row><row _id="row-cms5.8m2f~7hyg" _uuid="00000000-0000-0000-2344-42C7CCC863EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cms5.8m2f~7hyg"><intent_id>1214071</intent_id><project_id>1001106</project_id><text_data>TRANSFER EXISTING AERIAL FIBER OPTIC CABLE FROM EXISTING SCL POLE TO NEW REPLACEMENT POLE.</text_data><comment_date>2022-02-25T00:00:00</comment_date></row><row _id="row-9ycd-d6pk-a3kz" _uuid="00000000-0000-0000-44D1-0604A8CD17CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ycd-d6pk-a3kz"><intent_id>941527</intent_id><project_id>845664</project_id><text_data>Providing the beautification of an area adjacent to the roadway using a blower/mulch truck.</text_data><comment_date>2018-10-23T00:00:00</comment_date></row><row _id="row-6vp2_2reu~jwxb" _uuid="00000000-0000-0000-3044-524751179561" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6vp2_2reu~jwxb"><intent_id>824116</intent_id><project_id>816347</project_id><text_data>General Laborer: Performs work of shoveling with a hand shovel, sweeping/cleaning with a hand broom, heating joints with a Flamo, tacking using a tack bucket and hand broom.Other Trucks: A Low Boy trailer used for delivery and pick up of equipment.</text_data><comment_date>2017-04-03T00:00:00</comment_date></row><row _id="row-96h4.hgvd.zt99" _uuid="00000000-0000-0000-C5F2-08A53F613BE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96h4.hgvd.zt99"><intent_id>896677</intent_id><project_id>835493</project_id><text_data>1- Countertops for apartment building 2- Apartments3- 3 Story4- (a)No (b)No (c)Yes (d)No (e)No (f)No (g)No (h)No (i)No (j)No (k)No (l)No5- Yes6- Yes7- Yes8- No</text_data><comment_date>2018-04-04T00:00:00</comment_date></row><row _id="row-dnbi-8ksb~pk9y" _uuid="00000000-0000-0000-1B56-CBDCAFDA617A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dnbi-8ksb~pk9y"><intent_id>593803</intent_id><project_id>716613</project_id><text_data>PENHALL JOB # 230830tRUCK DRIVE IS AN OIL DISPERSEMENT TRUCK.</text_data><comment_date>2013-09-16T00:00:00</comment_date></row><row _id="row-zdpr-u29q.nq99" _uuid="00000000-0000-0000-7DD7-CE749CC13A24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdpr-u29q.nq99"><intent_id>522368</intent_id><project_id>691621</project_id><text_data>Tyler  51st Ave NE</text_data><comment_date>2012-07-16T00:00:00</comment_date></row><row _id="row-7bmt-fsu6-dx34" _uuid="00000000-0000-0000-8D8F-58A753D99E48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7bmt-fsu6-dx34"><intent_id>795995</intent_id><project_id>804958</project_id><text_data>DODGE RAM 3500FORD F150FORD F350 DIESEL CREW CAB</text_data><comment_date>2016-10-20T00:00:00</comment_date></row><row _id="row-tcqa.nfru_2yqz" _uuid="00000000-0000-0000-A54F-C8AD38EFC838" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tcqa.nfru_2yqz"><intent_id>1021128</intent_id><project_id>899215</project_id><text_data>Other trucks are lowboy and escort for mobilization</text_data><comment_date>2019-11-12T00:00:00</comment_date></row><row _id="row-ss9m~pqkv_pjpi" _uuid="00000000-0000-0000-A302-1148860545EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ss9m~pqkv_pjpi"><intent_id>568484</intent_id><project_id>710537</project_id><text_data>PO# 5C21-21217 AMOUNT 1722.00</text_data><comment_date>2013-05-08T00:00:00</comment_date></row><row _id="row-3zp2~r8nd~6mvd" _uuid="00000000-0000-0000-E970-EC42C8BA9778" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3zp2~r8nd~6mvd"><intent_id>1121553</intent_id><project_id>950119</project_id><text_data>Service truck used to get to work site and carry any possible needed hand tools or parts</text_data><comment_date>2021-02-10T00:00:00</comment_date></row><row _id="row-qbct~4te9_5qp8" _uuid="00000000-0000-0000-D54E-F5F6D8BBD3F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbct~4te9_5qp8"><intent_id>727967</intent_id><project_id>765609</project_id><text_data>1115090</text_data><comment_date>2015-10-23T00:00:00</comment_date></row><row _id="row-689w_cs64_qj3w" _uuid="00000000-0000-0000-CDB2-AA1E5EB1817A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-689w_cs64_qj3w"><intent_id>704364</intent_id><project_id>748190</project_id><text_data>Project:  University of Washington Guthrie Hall Project This letter is intended to address our request of ran exemption for prevailing wages for the subject project.  The project name is as state in the subject line above.  Our subcontract is with Pacific coast Electrical Contractors who has hired us to perform professional services, specifically the task of electrical testing for the subject project.  The testing involves preforming acceptance/quality tests of 5,000 volt cables.1.	Purpose of Project:  The purpose of the work performed by Sigma Six solutions is to provide professional electrical testing services to check the quality of specific electrical parameters associated with the electrical distribution system. 2.	Remodeling or New Construction:  Sigma Six�s work does not entail remodeling or construction activities or tasks; the work to be performed is only electrical testing.  However, the work of Pacific Coast Electrical Contractors does involve new construction. 3.	Specific Tasks performed by sigma Six Solutions:  a. Pacific Coast Electrical Contractor�s craftsmen (IBEW electricians) will perform all labor and tool work associated with any assembly and installation work.  The electrical testing performed by Sigma Six Solutions� filed engineers and technician w will not involve any disassembly or re-assembly activity. b. A Sigma Six employee will operate portable test equipment to perform the test on the subject components.  The test equipment is owned by Sigma Six and is not part of the project tor product involved.  No tool work, assembly, disassembly, or any other construction craft activity will be performed by any Sigma Six employee.  All such labor will be performed by Pacific Coast Electrical Contractors electricians. c. A Sigma Six employee will record data observed during testing and provide Milne Electric with a written report of test results. d. At the completion of the testing, Pacific Coast Electrical Contractors electricians will proceed with their construction activities to energize the electrical equipment. 4. 	Tools Used by Sigma Six Solutions:  a. No hand or construction tools will be used by Sigma Six employees.  All tool work will be performed by Pacific Coast electrical Contractors electricians as described above. 5. 	Sigma Six Employee Hands-On Effort:  a. A Sigma Six employee will operate portable test instrument owned by Sigma Six Solutions and record data for the report. Sincerely, Phillip SernaPacific Northwest Area ManagerSigma Six Solutions</text_data><comment_date>2015-06-30T00:00:00</comment_date></row><row _id="row-n29w-hecj.zs52" _uuid="00000000-0000-0000-E4CC-E5DDF7F39F8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n29w-hecj.zs52"><intent_id>1189236</intent_id><project_id>985764</project_id><text_data>Installation of wire and antennas on the interior of the building to include testing for proper signal.</text_data><comment_date>2021-10-28T00:00:00</comment_date></row><row _id="row-rdd7_c5tn-ixxq" _uuid="00000000-0000-0000-F322-94C7A6F06812" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rdd7_c5tn-ixxq"><intent_id>836994</intent_id><project_id>822927</project_id><text_data>Project is spraying on sealant to existing splash pads for Spokane Parks and Recreation.  Crew will be using a 5 gallon sprayer and paint rollers.</text_data><comment_date>2017-06-12T00:00:00</comment_date></row><row _id="row-xbke~h6ma_e98y" _uuid="00000000-0000-0000-5DAF-F96F073D4944" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xbke~h6ma_e98y"><intent_id>814979</intent_id><project_id>807779</project_id><text_data>Job #110299-001</text_data><comment_date>2017-02-08T00:00:00</comment_date></row><row _id="row-9ktm_j4qh.g2ck" _uuid="00000000-0000-0000-B8CF-0C3217E169EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ktm_j4qh.g2ck"><intent_id>502350</intent_id><project_id>681838</project_id><text_data>712 S. 12TH AVEYAKIMA,WA 98902</text_data><comment_date>2012-03-01T00:00:00</comment_date></row><row _id="row-4fnt~xrr5-p359" _uuid="00000000-0000-0000-7619-4D52E7BECBC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4fnt~xrr5-p359"><intent_id>618464</intent_id><project_id>730114</project_id><text_data>139 Savio Rd Glenoma</text_data><comment_date>2014-03-03T00:00:00</comment_date></row><row _id="row-sb28_jan3.kwmu" _uuid="00000000-0000-0000-AF8F-03A55B039881" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sb28_jan3.kwmu"><intent_id>1188445</intent_id><project_id>985311</project_id><text_data>WO #425037</text_data><comment_date>2021-10-26T00:00:00</comment_date></row><row _id="row-5ymj_mwvh~wi8z" _uuid="00000000-0000-0000-8ED2-D64BC2AB100D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ymj_mwvh~wi8z"><intent_id>958176</intent_id><project_id>872212</project_id><text_data>1. Weatherization2. single family3. 1 or 24a nob noc yesd noe nof nog noh noI noj nok nol5. yes6. yesI. no</text_data><comment_date>2019-01-31T00:00:00</comment_date></row><row _id="row-b7q7_x8md-ruaa" _uuid="00000000-0000-0000-4466-E2F85ABB47A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b7q7_x8md-ruaa"><intent_id>713566</intent_id><project_id>769636</project_id><text_data>ALOHA ISLAND FLOORING UBI# 602-020-945REG# CC ALOHAIF008DN</text_data><comment_date>2015-08-11T00:00:00</comment_date></row><row _id="row-2xq4.r4gh-ck4x" _uuid="00000000-0000-0000-3961-2311D4BBFB7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2xq4.r4gh-ck4x"><intent_id>1063311</intent_id><project_id>891633</project_id><text_data>Jameson, Jesse (LNI) &amp;lt;JAJC235@LNI.WA.GOV&amp;gt;Hi Bobbi, Tyson Thank you, enjoyed speaking with you two as well. Per our telephone discussion this morning and based on the information provided below, contractor registration is not required.  Feel free to forward this email to Prevailing Wage. Kindest regards,Jesse L JamesonTechnical SpecialistConstruction Contractor Compliance  Jesse L JamesonTechnical SpecialistConstruction Contractor Compliance 12806 Gateway Dr S, Tukwila WA. 98168206-835-1107</text_data><comment_date>2020-06-12T00:00:00</comment_date></row><row _id="row-4jq6_akzu_gmrq" _uuid="00000000-0000-0000-0AAD-6B24C3402BA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4jq6_akzu_gmrq"><intent_id>893035</intent_id><project_id>845916</project_id><text_data>1) HWT replacement/re-pipe. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f) No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) Yes - manager office. 8) No.</text_data><comment_date>2018-03-15T00:00:00</comment_date></row><row _id="row-hh63~jbwj_7h4k" _uuid="00000000-0000-0000-7F95-ECD4E64ACBA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hh63~jbwj_7h4k"><intent_id>798968</intent_id><project_id>806157</project_id><text_data>Replacing vents on tile roof with like type vents.  No special tools needed: hammer, screws, drill, standard work truck.</text_data><comment_date>2016-11-08T00:00:00</comment_date></row><row _id="row-mvan.pea2~jhva" _uuid="00000000-0000-0000-0C71-9D882FFDAF64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mvan.pea2~jhva"><intent_id>814776</intent_id><project_id>811000</project_id><text_data>Dump trucking services only.  Project is rehab of 3rd ave in renton, including pavement removal and replacement, signals etc.</text_data><comment_date>2017-02-07T00:00:00</comment_date></row><row _id="row-kmnp~b9bv.2tzx" _uuid="00000000-0000-0000-40BA-7712D2AD5401" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kmnp~b9bv.2tzx"><intent_id>825745</intent_id><project_id>817766</project_id><text_data>Service Call #161227-0070</text_data><comment_date>2017-04-11T00:00:00</comment_date></row><row _id="row-3bkb-zs7j~pjm7" _uuid="00000000-0000-0000-D584-C37112F63CDC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bkb-zs7j~pjm7"><intent_id>586067</intent_id><project_id>716376</project_id><text_data>Form filed by: Lucille Arson</text_data><comment_date>2013-08-07T00:00:00</comment_date></row><row _id="row-39sb-4qmy-df7h" _uuid="00000000-0000-0000-E9AE-2645787FFB77" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39sb-4qmy-df7h"><intent_id>756119</intent_id><project_id>789359</project_id><text_data>PC6 JOB 3878</text_data><comment_date>2016-04-12T00:00:00</comment_date></row><row _id="row-6kri~mns3~udxb" _uuid="00000000-0000-0000-5F3A-0DB0CB83D00A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6kri~mns3~udxb"><intent_id>986588</intent_id><project_id>884065</project_id><text_data>0919038</text_data><comment_date>2019-06-21T00:00:00</comment_date></row><row _id="row-4sq7-m9zd_y2km" _uuid="00000000-0000-0000-C1D7-414FF98638C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4sq7-m9zd_y2km"><intent_id>1138035</intent_id><project_id>959365</project_id><text_data>Job # 36569-1 / MASD - ECEAP Building / 4317 76th St NE, Marysville, WA 98270Job # 36570-1 / MASD - Kellogg Marsh Elementary / 6325 91st St NE, Marysville, WA 98270Job # 36570-1 / MASD - Sunnyside Elementary / 3707 Sunnyside Blvd, Marysville, WA 98270</text_data><comment_date>2021-04-22T00:00:00</comment_date></row><row _id="row-gdch_8sqs-afex" _uuid="00000000-0000-0000-BFA2-FC55C46D7C97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gdch_8sqs-afex"><intent_id>892214</intent_id><project_id>845536</project_id><text_data>Filed by James L Vann Jr.</text_data><comment_date>2018-03-12T00:00:00</comment_date></row><row _id="row-vcfu~iwax.pfpd" _uuid="00000000-0000-0000-F9C9-BB07C9B01EF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vcfu~iwax.pfpd"><intent_id>842043</intent_id><project_id>824993</project_id><text_data>Filed by Beverly Shuford</text_data><comment_date>2017-06-20T00:00:00</comment_date></row><row _id="row-98ge-zp8p.t7zz" _uuid="00000000-0000-0000-ED88-F4B1CE4E9C0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-98ge-zp8p.t7zz"><intent_id>762138</intent_id><project_id>788047</project_id><text_data>Disregard Exempt notes. Customer listed a Programmer</text_data><comment_date>2016-05-23T00:00:00</comment_date></row><row _id="row-6wv5-aq5q-eghd" _uuid="00000000-0000-0000-D52F-E27510DDC2EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6wv5-aq5q-eghd"><intent_id>722992</intent_id><project_id>773355</project_id><text_data>GENERAL LABOR WORK CONSISTS OF THE FOLLOWING: 1) HAND WORK (SHOVEL WORK) NO POWER EQUIPMENT OR POWER TOOLS. $29.84(BASE) + $7.46(FRINGE) 2) PILOT CAR DRIVER USED FOR MOBILIZING HEAVEY EQUPMENT TO AND FROM THE PROJECT SITE.    $29.87(BASE) + $7.47(FRINGE) BLADE OPERATOR IS USED FOR GRADING THE PROJECT SITE FOR COMPACTION BEFORE PAVING OR CHIP SEALING OPERATIONS OTHER TRUCKS CONSIST OF A 0-8,000 GALLON WATER TRUCK USED FOR WATERING THE PROJECT SITE DURING THE GRADING PROCESS TO HELP WITH COMPACTION.</text_data><comment_date>2015-09-25T00:00:00</comment_date></row><row _id="row-2f7w~3935.scu4" _uuid="00000000-0000-0000-6873-41F7B2E8B817" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2f7w~3935.scu4"><intent_id>1138180</intent_id><project_id>959438</project_id><text_data>The washer is a commercial washer attached to the floor.</text_data><comment_date>2021-05-03T00:00:00</comment_date></row><row _id="row-wivv_kncr~t3su" _uuid="00000000-0000-0000-A814-ED4024D5458B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wivv_kncr~t3su"><intent_id>831292</intent_id><project_id>820044</project_id><text_data>The general laborer uncrates and sets in place � no hook ups � commercial kitchen equipment.</text_data><comment_date>2017-05-09T00:00:00</comment_date></row><row _id="row-ua8z~5ebd-h5zz" _uuid="00000000-0000-0000-25DC-49174AA35D7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ua8z~5ebd-h5zz"><intent_id>778509</intent_id><project_id>798352</project_id><text_data>The general laborers will be digging the holes for the flag poles by hand, using picks &amp; shovels.</text_data><comment_date>2016-07-29T00:00:00</comment_date></row><row _id="row-p4u4~eg49_zyx9" _uuid="00000000-0000-0000-FFA1-91F82CCC231E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4u4~eg49_zyx9"><intent_id>1216675</intent_id><project_id>961472</project_id><comment_date>2022-03-09T00:00:00</comment_date></row><row _id="row-kwx6_py8s-hjgc" _uuid="00000000-0000-0000-2D0A-870FB9A74440" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kwx6_py8s-hjgc"><intent_id>622765</intent_id><project_id>732087</project_id><text_data>Millwrights Fringe:Health &amp; Security: $7.41;  Retirement: $5.50; Apprenticeship Fund: $.71Laborers Fringe:Health:  $5.70;  Pension:  $3.90; Training: $.045; Industry Fringe: $.24</text_data><comment_date>2014-04-03T00:00:00</comment_date></row><row _id="row-sqy5~w8hk-nf4g" _uuid="00000000-0000-0000-8FC5-36C20FE982D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqy5~w8hk-nf4g"><intent_id>542809</intent_id><project_id>673400</project_id><text_data>This is to wrap the HVAC ducts for Apollo sheet metal.</text_data><comment_date>2012-11-02T00:00:00</comment_date></row><row _id="row-en2w~ygcf~cfa7" _uuid="00000000-0000-0000-A90A-2D3C422425AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-en2w~ygcf~cfa7"><intent_id>989022</intent_id><project_id>881371</project_id><text_data>Installation of plant material and trees, soil (~6-8' depth), compost (~3' depth), and bark/wood chip mulch (3-4' depth).  Installation by small equipment and hand tools no greater than 35 CC.  Purpose is for beautification of a new street.</text_data><comment_date>2019-07-02T00:00:00</comment_date></row><row _id="row-b866~7fe3~ugpb" _uuid="00000000-0000-0000-ADBD-F447F4F1888C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b866~7fe3~ugpb"><intent_id>1263731</intent_id><project_id>1029423</project_id><text_data>WO #28761</text_data><comment_date>2022-09-02T00:00:00</comment_date></row><row _id="row-pqek.guwm_uxen" _uuid="00000000-0000-0000-C773-7206EAC29D48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqek.guwm_uxen"><intent_id>613642</intent_id><project_id>728015</project_id><text_data>1)We were contracted to replace an electric furnace. 2)Single family dwelling. 3)1, 4)Residentail home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2014-01-24T00:00:00</comment_date></row><row _id="row-q7k2-i5k9.dtcr" _uuid="00000000-0000-0000-F7BE-FF7D9DB2999B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q7k2-i5k9.dtcr"><intent_id>616930</intent_id><project_id>729419</project_id><text_data>Scope of work:  Weedeat Blackberry and cut all dead vegetation to ground level, mulch on-site. Install plants and 4&amp;quot; of bark mulch.</text_data><comment_date>2014-02-19T00:00:00</comment_date></row><row _id="row-qnwc_5aer-ieej" _uuid="00000000-0000-0000-914D-9449102FF96C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qnwc_5aer-ieej"><intent_id>1223766</intent_id><project_id>1007377</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-04-27T00:00:00</comment_date></row><row _id="row-mc6b-4w66-jvaw" _uuid="00000000-0000-0000-11A1-801E4F747D0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mc6b-4w66-jvaw"><intent_id>599030</intent_id><project_id>704662</project_id><text_data>This is new construction of a small town police department.  I do not have detailed knowledge of what the other contractors do.  LANDSCAPE AND IRRIGATION, small trackhoe will be used for installation of sleeving and irrigation, planting trees. Planting shrubs by hand. Hydroseeding with spreader type equipment.</text_data><comment_date>2013-11-19T00:00:00</comment_date></row><row _id="row-5wfb-2yp3-r4zr" _uuid="00000000-0000-0000-32DF-316FC6E5616A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5wfb-2yp3-r4zr"><intent_id>1366397</intent_id><project_id>1088770</project_id><text_data>9916249</text_data><comment_date>2023-09-24T00:00:00</comment_date></row><row _id="row-v7k6_z5py.qfq2" _uuid="00000000-0000-0000-3B49-56ED3D588BC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v7k6_z5py.qfq2"><intent_id>703105</intent_id><project_id>763101</project_id><text_data>The work will consist of fish capture and relocation from stream sections isolated for construction.  The work will be performed by a certified fisheries professional and staff biologists. The equipment used to perform the work will consist of an electrofisher and nets.</text_data><comment_date>2015-06-26T00:00:00</comment_date></row><row _id="row-3nzu_pbw8.wb68" _uuid="00000000-0000-0000-D919-ACD4AD25954D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3nzu_pbw8.wb68"><intent_id>1258477</intent_id><project_id>1026751</project_id><text_data>429470 Sunny Hills Elementary - Lighting repairs as directed.</text_data><comment_date>2022-08-16T00:00:00</comment_date></row><row _id="row-gaec~sewn~jc5z" _uuid="00000000-0000-0000-E815-3438B1F49903" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gaec~sewn~jc5z"><intent_id>726524</intent_id><project_id>774685</project_id><text_data>Installing Cat 5e Cabling for Voice and WAPs for indoor use.</text_data><comment_date>2015-10-15T00:00:00</comment_date></row><row _id="row-katm-28ku.gv27" _uuid="00000000-0000-0000-011E-733A96771C65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-katm-28ku.gv27"><intent_id>1418451</intent_id><project_id>1119718</project_id><text_data>9937999</text_data><comment_date>2024-04-11T00:00:00</comment_date></row><row _id="row-icv9_ik4g~2tc9" _uuid="00000000-0000-0000-7945-EBEF2D81A3A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-icv9_ik4g~2tc9"><intent_id>1078606</intent_id><project_id>928313</project_id><text_data>This is a project that has been replanted with native trees and shrubs and now requires maintenance to assure their survival. These are all hand labor tasks.Specific tasks:maintenance brush control, using weed trimmers and/or walk behind mowersmaintenance brush control using the application of herbicides directly to competing invasive plants, using a hand held wand attached to a small backpack tank, under the direct supervision of a licensed applicator.maintenance tube qc, or tube quality control: walk through previously planted areas and adjust tree protectors and the stakes they�re attached to so they will continue to protect the young trees.</text_data><comment_date>2020-08-07T00:00:00</comment_date></row><row _id="row-wmjk_hgvh.68h7" _uuid="00000000-0000-0000-A0C0-8F22AD5AF078" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wmjk_hgvh.68h7"><intent_id>1024251</intent_id><project_id>900736</project_id><text_data>other trucks include 4000 gal water truck for dust control</text_data><comment_date>2019-11-27T00:00:00</comment_date></row><row _id="row-pn8p_xg2u~6qbs" _uuid="00000000-0000-0000-64E7-4C2015159603" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pn8p_xg2u~6qbs"><intent_id>761806</intent_id><project_id>791866</project_id><text_data>Telephone System and Computer Network System</text_data><comment_date>2016-05-18T00:00:00</comment_date></row><row _id="row-sij5_dg8s~m4ie" _uuid="00000000-0000-0000-5705-DE9D887DD756" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sij5_dg8s~m4ie"><intent_id>629840</intent_id><project_id>735051</project_id><text_data>Job Order Contract No. CN 0008-13 - 141074 OB</text_data><comment_date>2014-05-15T00:00:00</comment_date></row><row _id="row-gjhb~6ngj~8mtu" _uuid="00000000-0000-0000-3801-85F6949BBD7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gjhb~6ngj~8mtu"><intent_id>956150</intent_id><project_id>839135</project_id><text_data>install Cat 6 cabling inside School</text_data><comment_date>2019-01-21T00:00:00</comment_date></row><row _id="row-7224.uksp~ede9" _uuid="00000000-0000-0000-BC73-56F968EDCB4E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7224.uksp~ede9"><intent_id>920491</intent_id><project_id>856793</project_id><text_data>Filed by Joe Greenhan</text_data><comment_date>2018-07-24T00:00:00</comment_date></row><row _id="row-xshw_kdh8_6r8u" _uuid="00000000-0000-0000-8FA6-8839FD63C0B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xshw_kdh8_6r8u"><intent_id>1039460</intent_id><project_id>909045</project_id><text_data>FILED BY DEBORAH MOCK</text_data><comment_date>2020-02-19T00:00:00</comment_date></row><row _id="row-zacv_3wnp~8d5e" _uuid="00000000-0000-0000-FC99-AAF4D937D088" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zacv_3wnp~8d5e"><intent_id>528360</intent_id><project_id>691319</project_id><text_data>PENHALL jOB # 230725</text_data><comment_date>2012-08-14T00:00:00</comment_date></row><row _id="row-yus9~n4hm_vxfg" _uuid="00000000-0000-0000-6D61-1067A0C47323" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yus9~n4hm_vxfg"><intent_id>576426</intent_id><project_id>709956</project_id><text_data>Job Quintero 995 Hwy 26 W #1 Royal City Wa 99357    331-6491</text_data><comment_date>2013-06-19T00:00:00</comment_date></row><row _id="row-kfbn-cb79-bh2i" _uuid="00000000-0000-0000-BC24-60F78B4EC49E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kfbn-cb79-bh2i"><intent_id>1079798</intent_id><project_id>928327</project_id><comment_date>2020-08-12T00:00:00</comment_date></row><row _id="row-whkt-ejnh-znd3" _uuid="00000000-0000-0000-868C-A44BA8954097" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-whkt-ejnh-znd3"><intent_id>1317358</intent_id><project_id>1061973</project_id><text_data>1.Weatherization 2. single family 3. 1 4. Aa0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2023-04-06T00:00:00</comment_date></row><row _id="row-dc3f_c3rz_s2dn" _uuid="00000000-0000-0000-36BA-9E28D2DF6D2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dc3f_c3rz_s2dn"><intent_id>688187</intent_id><project_id>759385</project_id><text_data>Install Insulation, Single Family, SIngle Story, No, No, Yes, No, No, No, No, No, No, No, No, Yes, Yes, No, No</text_data><comment_date>2015-04-09T00:00:00</comment_date></row><row _id="row-nn3e_hy3d.65ka" _uuid="00000000-0000-0000-17DC-DB24996652CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nn3e_hy3d.65ka"><intent_id>870282</intent_id><project_id>835572</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-10-20T00:00:00</comment_date></row><row _id="row-ejj6~bzjk-zb3z" _uuid="00000000-0000-0000-5BE1-3E0890C663A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ejj6~bzjk-zb3z"><intent_id>1258740</intent_id><project_id>1023037</project_id><text_data>OTHER TRUCK IS SEMI TRUCK WITH A FLAT BED USED TO HAUL MEDIAN BARRIER</text_data><comment_date>2022-08-17T00:00:00</comment_date></row><row _id="row-kj8b-atmx~v2tg" _uuid="00000000-0000-0000-C9A4-53940504161B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kj8b-atmx~v2tg"><intent_id>1055032</intent_id><project_id>761907</project_id><text_data>Owner will do the work</text_data><comment_date>2020-04-30T00:00:00</comment_date></row><row _id="row-7nw7-cey2-mwpk" _uuid="00000000-0000-0000-13DB-06C790B29CEE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7nw7-cey2-mwpk"><intent_id>1114711</intent_id><project_id>946091</project_id><text_data>Training is complete.  Thanks</text_data><comment_date>2021-02-22T00:00:00</comment_date></row><row _id="row-5ny5.zur6.n8sp" _uuid="00000000-0000-0000-C665-A203C291F802" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ny5.zur6.n8sp"><intent_id>707688</intent_id><project_id>766582</project_id><text_data>Trucks / Other Trucks = Oil Distributor Truck (sealcoating)</text_data><comment_date>2015-07-15T00:00:00</comment_date></row><row _id="row-wetv.6vph.vkuu" _uuid="00000000-0000-0000-7889-3DE1F433380F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wetv.6vph.vkuu"><intent_id>1055227</intent_id><project_id>914087</project_id><comment_date>2020-05-01T00:00:00</comment_date></row><row _id="row-m26q~396u_hdnt" _uuid="00000000-0000-0000-CA5C-3ACA8DAC828E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m26q~396u_hdnt"><intent_id>737359</intent_id><project_id>780638</project_id><text_data>WORK PERFORMED BY THE TELECOMMUNICATION TECHNICIANS IS INSTALLING TELECOMMUNICATIONS CABLING CATEGORY 6 FOR VOICE (TELEPHONE) AND DATA (COMPUTER NETWORKING) INDOORS.</text_data><comment_date>2015-12-12T00:00:00</comment_date></row><row _id="row-tkhx~eyiu_zjyg" _uuid="00000000-0000-0000-01D4-A89269071C78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tkhx~eyiu_zjyg"><intent_id>695859</intent_id><project_id>734333</project_id><text_data>From: Ramona Landreth [mailto:ramona@reliancefire.com] Sent: Friday, May 22, 2015 11:36 AMTo: LNI RE Prevailing Wage Worker 1Subject: RE: revised intent 69589-Contract# SW-0317969 WA# 9065 Concourse A Bypass Portal Sprinkler RevisionsRamona C. LandrethOffice ManagerT: (206) 682-6636F: (206) 682-6744</text_data><comment_date>2015-05-22T00:00:00</comment_date></row><row _id="row-t2ii_9hy7~sd8x" _uuid="00000000-0000-0000-38F0-CB312D7F128D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t2ii_9hy7~sd8x"><intent_id>1185881</intent_id><project_id>983804</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. BCI Project No. GA2033</text_data><comment_date>2021-10-15T00:00:00</comment_date></row><row _id="row-kynu.mt8n-65q3" _uuid="00000000-0000-0000-9CE5-E24AF0465F04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kynu.mt8n-65q3"><intent_id>632540</intent_id><project_id>720329</project_id><text_data>Truck driver will be driving a 3000 gal truck mounted hydroseeder</text_data><comment_date>2014-06-02T00:00:00</comment_date></row><row _id="row-h8my~2af9_z8t3" _uuid="00000000-0000-0000-9D62-E197413D4D30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h8my~2af9_z8t3"><intent_id>473480</intent_id><project_id>668674</project_id><text_data>what information is required for you to process this form, I already stated that our work is irrigation work, we are using irrigation rates, what else do you need.</text_data><comment_date>2011-09-13T00:00:00</comment_date></row><row _id="row-wbqy_d9uh-9e9x" _uuid="00000000-0000-0000-CBCB-781275567664" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wbqy_d9uh-9e9x"><intent_id>1036573</intent_id><project_id>906298</project_id><text_data>Will apply Fringe Cost to individual employees</text_data><comment_date>2020-02-06T00:00:00</comment_date></row><row _id="row-2jy8~n425.qga8" _uuid="00000000-0000-0000-BB0E-E4F1AA60CAF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2jy8~n425.qga8"><intent_id>1178336</intent_id><project_id>979711</project_id><text_data>WO#26122 Job#2711</text_data><comment_date>2021-09-16T00:00:00</comment_date></row><row _id="row-jqkm_hu2r-v6hj" _uuid="00000000-0000-0000-EEB0-B6B9878F220B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jqkm_hu2r-v6hj"><intent_id>458558</intent_id><project_id>666330</project_id><text_data>We will be installing a restoration planting along a stream and on private property.  Also some street landscaping trees.</text_data><comment_date>2011-06-02T00:00:00</comment_date></row><row _id="row-kzrt.njms.k4ay" _uuid="00000000-0000-0000-972B-66A5E46AF799" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kzrt.njms.k4ay"><intent_id>472457</intent_id><project_id>617905</project_id><text_data>Work to be performed will be final seeding with a Bowie Hydroseeder under 95 hp and Brillion seeding with a 45 hp John Deere tractor</text_data><comment_date>2011-08-16T00:00:00</comment_date></row><row _id="row-5iz3~6kta~7meg" _uuid="00000000-0000-0000-76A7-FF56B24474B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5iz3~6kta~7meg"><intent_id>569248</intent_id><project_id>710852</project_id><text_data>RESIDENTIAL WEATHERIZATION PROJECT</text_data><comment_date>2013-05-13T00:00:00</comment_date></row><row _id="row-b28d_5qyq-tv5s" _uuid="00000000-0000-0000-DCFC-6D71669F333B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b28d_5qyq-tv5s"><intent_id>517918</intent_id><project_id>690036</project_id><text_data>HIF# 12735178</text_data><comment_date>2012-06-20T00:00:00</comment_date></row><row _id="row-hyq9~gzs2.ctsi" _uuid="00000000-0000-0000-69BC-2C4829F66E8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hyq9~gzs2.ctsi"><intent_id>1217287</intent_id><project_id>963626</project_id><text_data>The Prime contractor provided/verified this wage we are using.  We asked them.  We are a lower end sub to a large scale housing project. Low income housing - we installed a water detention system (R-Tanks) for this housing project/unitsMy understanding is multiple units of low income housing I do not know this answer.  My understanding is multi unit housing for low incomeLow income housingI do not know I do not knowI do not knowI do not know.</text_data><comment_date>2022-03-11T00:00:00</comment_date></row><row _id="row-5imp.dzvr_cj97" _uuid="00000000-0000-0000-044B-EF180117E7CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5imp.dzvr_cj97"><intent_id>1189847</intent_id><project_id>967937</project_id><text_data>The number of workers may change.</text_data><comment_date>2021-12-02T00:00:00</comment_date></row><row _id="row-r73m~wsrn-zrna" _uuid="00000000-0000-0000-7770-D77E343086B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r73m~wsrn-zrna"><intent_id>493667</intent_id><project_id>378490</project_id><text_data>18 Wheel flatbed to haul parts for crane.</text_data><comment_date>2011-12-15T00:00:00</comment_date></row><row _id="row-j4wm.2muy-uu39" _uuid="00000000-0000-0000-78EB-F140900FE4B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j4wm.2muy-uu39"><intent_id>1111911</intent_id><project_id>922237</project_id><text_data>Truck Driver 'Other' used for truck mounted pick up sweeper and/or 2000-4000 gallon water truck</text_data><comment_date>2020-12-27T00:00:00</comment_date></row><row _id="row-vcvi_m3n4~gvxd" _uuid="00000000-0000-0000-8883-403011F5271A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vcvi_m3n4~gvxd"><intent_id>1011365</intent_id><project_id>894483</project_id><comment_date>2019-10-01T00:00:00</comment_date></row><row _id="row-xjir-6fyc_eqhg" _uuid="00000000-0000-0000-8165-EB7D420DA31C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xjir-6fyc_eqhg"><intent_id>696116</intent_id><project_id>762973</project_id><text_data>Performed State Required Corrections for VPL and Annual Safety Test</text_data><comment_date>2015-05-22T00:00:00</comment_date></row><row _id="row-hqwi-yde5.6e5w" _uuid="00000000-0000-0000-1D79-7D52C4D81A44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hqwi-yde5.6e5w"><intent_id>871112</intent_id><project_id>835906</project_id><text_data>DEI Job D002728</text_data><comment_date>2017-10-25T00:00:00</comment_date></row><row _id="row-cb2k_gv6t~bbx9" _uuid="00000000-0000-0000-4D48-ECECD07721E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cb2k_gv6t~bbx9"><intent_id>472213</intent_id><project_id>672321</project_id><text_data>I am not sure if the contract bid due date is correct.</text_data><comment_date>2011-08-15T00:00:00</comment_date></row><row _id="row-4yph-nm5k.yp82" _uuid="00000000-0000-0000-3AFA-7AE394D09E78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4yph-nm5k.yp82"><intent_id>722196</intent_id><project_id>761171</project_id><text_data>1. Weatherization 2. Apartment 3. 3 stories 4. living a. no b. no c. yes d. no e. no f. no g. no h. no i. no j. yes k. yes 6. yes 7. no 8. no</text_data><comment_date>2015-09-22T00:00:00</comment_date></row><row _id="row-h9xc-aqkd.5px4" _uuid="00000000-0000-0000-042B-1021BBD8FB04" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h9xc-aqkd.5px4"><intent_id>598939</intent_id><project_id>715919</project_id><text_data>Filed by Fred Z.</text_data><comment_date>2013-10-11T00:00:00</comment_date></row><row _id="row-h5ms-q6bw-nrf5" _uuid="00000000-0000-0000-1EBE-CDD547FE1AB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h5ms-q6bw-nrf5"><intent_id>1005682</intent_id><project_id>879592</project_id><text_data>Other Trucks are Lowboys used to haul equipment</text_data><comment_date>2019-09-09T00:00:00</comment_date></row><row _id="row-r64s-jfra-ixhr" _uuid="00000000-0000-0000-851D-A6A71E2FCE87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r64s-jfra-ixhr"><intent_id>838511</intent_id><project_id>810836</project_id><text_data>Job #111991-001 Related to Job #22958-002</text_data><comment_date>2017-06-06T00:00:00</comment_date></row><row _id="row-6may.gvtq~ibxx" _uuid="00000000-0000-0000-C093-B0D796AC637B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6may.gvtq~ibxx"><intent_id>1316204</intent_id><project_id>1012522</project_id><text_data>I worked 1.5 hrs on 3-22-23</text_data><comment_date>2023-04-01T00:00:00</comment_date></row><row _id="row-dfz3~8rtm_qsgr" _uuid="00000000-0000-0000-C0E3-56277F8B3ABC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfz3~8rtm_qsgr"><intent_id>1316947</intent_id><project_id>1006670</project_id><text_data>24 ft box truck driven to site to pick up drum as part of route. Driver was onsite less then 30 min</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-wekz-529b_ffk5" _uuid="00000000-0000-0000-3CF7-189939C19053" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wekz-529b_ffk5"><intent_id>1465629</intent_id><project_id>1016467</project_id><text_data>We are supplying the toilet partitions for this project and have hired JL Millwork Installation to install these toilet partitions on site.  The toilet partitions are installed using cordless drills, tape measures, and various hand held tools like screwdrivers.</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-vjdz~cz93-68nb" _uuid="00000000-0000-0000-6A54-AD8F7AF8DB9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vjdz~cz93-68nb"><intent_id>1469675</intent_id><project_id>1146624</project_id><text_data>9949511</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-i2v4.22qr_7ayh" _uuid="00000000-0000-0000-4B05-C4605FEC4D38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2v4.22qr_7ayh"><intent_id>1465453</intent_id><project_id>1136734</project_id><text_data>hydroseed</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-imum.vpav-5997" _uuid="00000000-0000-0000-8F34-63EC93B64638" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imum.vpav-5997"><intent_id>1469611</intent_id><project_id>984544</project_id><text_data>0324053</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-sypg~6a5p_mwmp" _uuid="00000000-0000-0000-EB7C-B8D00F2D1A4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sypg~6a5p_mwmp"><intent_id>1465622</intent_id><project_id>1138216</project_id><text_data>$34.35 fringe consists of Pension $11.00, Health/Welfare $10.15, Vacation/PTO $2.65, Apprenticeship $0.87, All other $9.68 (Annuity $9.35 &amp; Impact $0.33)</text_data><comment_date>2024-09-11T00:00:00</comment_date></row><row _id="row-sanu.bebm-gb4q" _uuid="00000000-0000-0000-842F-E19BCD89F2A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sanu.bebm-gb4q"><intent_id>1469940</intent_id><project_id>1146772</project_id><text_data>SV001002333S</text_data><comment_date>2024-09-24T00:00:00</comment_date></row><row _id="row-n4dd-zej2~rvjz" _uuid="00000000-0000-0000-0F99-16C803A7EFAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n4dd-zej2~rvjz"><intent_id>1500832</intent_id><project_id>1157459</project_id><text_data>ALC NW provides digital controls design, programming and controllers. All on-site work is performed by our subcontractor who runs low voltage wiring and installs controllers.</text_data><comment_date>2025-01-13T00:00:00</comment_date></row><row _id="row-833z_ay5b-x3wy" _uuid="00000000-0000-0000-E548-240201B37F42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-833z_ay5b-x3wy"><intent_id>1509330</intent_id><project_id>1170314</project_id><text_data>#1- install heat pump system; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2025-02-12T00:00:00</comment_date></row><row _id="row-7hw4~kd4k~tsy7" _uuid="00000000-0000-0000-AD9B-841ADEBE9902" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7hw4~kd4k~tsy7"><intent_id>595165</intent_id><project_id>686106</project_id><text_data>Sent email:  On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2013-09-25T00:00:00</comment_date></row><row _id="row-mdzx-b8y8_3j6s" _uuid="00000000-0000-0000-298C-C377D61D1BE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mdzx-b8y8_3j6s"><intent_id>944186</intent_id><project_id>865826</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2018-11-06T00:00:00</comment_date></row><row _id="row-f88y-bcq2_j7c8" _uuid="00000000-0000-0000-8A44-386635F91C2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f88y-bcq2_j7c8"><intent_id>1103445</intent_id><project_id>929472</project_id><text_data>2007 Sterling LT7501 Vactor truck, 2012 GapVax Vactor Truck</text_data><comment_date>2020-11-24T00:00:00</comment_date></row><row _id="row-yejb~j36g~rirk" _uuid="00000000-0000-0000-4FB9-B0E41C3CD181" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yejb~j36g~rirk"><intent_id>628865</intent_id><project_id>734671</project_id><text_data>Mowing lawns with 21� self propelled mowers, line trimming with gas powered edger, blowing off grass debris from sidewalks using hand held blower.Applying granular fertilizer with hand held spreader. Spraying broadleaf weed control with hand held sprayer or pump and hose.Aerating turf with power aerator.Hand pulling weeds or spraying weeds with hand held sprayer.Pruning with hand pruners or hand saw.Cleaning up leaf and pine needle debris with rake, shovels, tarp, garbage can and hand held blower.Activating irrigation lines, programming controller, checking coverage of sprinkler zones and sprinkler heads.</text_data><comment_date>2014-05-20T00:00:00</comment_date></row><row _id="row-gh7a~gmea~jugt" _uuid="00000000-0000-0000-41A5-05094808D3AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gh7a~gmea~jugt"><intent_id>573848</intent_id><project_id>712710</project_id><text_data>Contractor invoice #2965</text_data><comment_date>2013-06-06T00:00:00</comment_date></row><row _id="row-w9w9_xk8f~w4ud" _uuid="00000000-0000-0000-34BA-CB517420A7CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9w9_xk8f~w4ud"><intent_id>1318290</intent_id><project_id>1062563</project_id><text_data>10733-5 2023</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-y58p-p3dv.3dv4" _uuid="00000000-0000-0000-FC75-CB2706CC9F5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y58p-p3dv.3dv4"><intent_id>832239</intent_id><project_id>813669</project_id><text_data>We are doing both - installing signs and striping.  Both are on here.  Not sure what you are looking for.</text_data><comment_date>2017-05-22T00:00:00</comment_date></row><row _id="row-egiu_ie5i_f3hz" _uuid="00000000-0000-0000-95BF-6CF500A573E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-egiu_ie5i_f3hz"><intent_id>1038857</intent_id><project_id>906201</project_id><text_data>A) Install rack and guard rail B) Same as A C) Installation of rack and guard rail using rotor hammer and wedge anchors. Used forklift.</text_data><comment_date>2020-03-03T00:00:00</comment_date></row><row _id="row-6xf4-8wmp.k7q3" _uuid="00000000-0000-0000-64C6-2A63DCF08BBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xf4-8wmp.k7q3"><intent_id>824099</intent_id><project_id>806195</project_id><text_data>Owner will perform dump trucking services on this project.</text_data><comment_date>2017-04-02T00:00:00</comment_date></row><row _id="row-wh4w.eedu~pa3a" _uuid="00000000-0000-0000-6ADE-3207E564761A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wh4w.eedu~pa3a"><intent_id>1254846</intent_id><project_id>1017985</project_id><text_data>The whole job will consist of an Emergency Contract for the improvement of SR 20 from MP 113.50 to MP 114.00 in rural Skagit County that was damaged in a major flood event (November 2021) by reconstructing the roadway and constructing a soldier pile wall. This permanent repair work shall include mobilization, stormwater diversion, roadway excavation, placing borrow, subgrade rock, HMA paving, pavement markings, dewatering, constructing soldier pile wall with concrete fascia panels and permanent ground anchors, also roadside restoration, traffic control, erosion control and other work.Our part of the job will be to install 1570 Lineal feet of coir logs. We will also be planting a variety of trees and plants to the job site. Top soil will be spread through out the site as well as soil amendments and bark or wood chip mulch. Lastly,130 lineal feet of live fascines will be planted here.</text_data><comment_date>2022-08-03T00:00:00</comment_date></row><row _id="row-i9ug~ipey-h47k" _uuid="00000000-0000-0000-6539-4C58434D1C0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9ug~ipey-h47k"><intent_id>768302</intent_id><project_id>793923</project_id><text_data>apprentices will be hired if any are available.</text_data><comment_date>2016-06-14T00:00:00</comment_date></row><row _id="row-wwtj_p7s3~taij" _uuid="00000000-0000-0000-B7B6-E7E950A96426" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wwtj_p7s3~taij"><intent_id>573021</intent_id><project_id>712366</project_id><text_data>Install Prunus lusitanica along sidewalk in right of way for Marcia.</text_data><comment_date>2013-06-04T00:00:00</comment_date></row><row _id="row-ges3~7h34.c4d6" _uuid="00000000-0000-0000-2D9D-38F2131B8026" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ges3~7h34.c4d6"><intent_id>822417</intent_id><project_id>816360</project_id><text_data>Install new cables for office cubicle that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-03-23T00:00:00</comment_date></row><row _id="row-evw5~8us5.7mzh" _uuid="00000000-0000-0000-8599-470922B18700" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-evw5~8us5.7mzh"><intent_id>912184</intent_id><project_id>806195</project_id><text_data>C&amp;R Tractor will be using dump trucks to bring in product for Grady Excavating.</text_data><comment_date>2018-06-19T00:00:00</comment_date></row><row _id="row-92yb.uax5~zxjr" _uuid="00000000-0000-0000-6B27-B58CC9FFD890" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-92yb.uax5~zxjr"><intent_id>639007</intent_id><project_id>738565</project_id><text_data>Job Order Contract  C00760C12</text_data><comment_date>2014-07-03T00:00:00</comment_date></row><row _id="row-i89f_8n8d.bqb6" _uuid="00000000-0000-0000-6DE2-AB3830B81A75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i89f_8n8d.bqb6"><intent_id>1193968</intent_id><project_id>988433</project_id><text_data>sr50504436</text_data><comment_date>2021-11-17T00:00:00</comment_date></row><row _id="row-qyes-isdx.y4n5" _uuid="00000000-0000-0000-FD7A-3C28CFA880F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qyes-isdx.y4n5"><intent_id>864222</intent_id><project_id>805660</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling for voice (telephone) and data (computer networking ) indoors.  Physical location: 7400 272nd St NW, Stanwood, Wa 98292</text_data><comment_date>2017-09-21T00:00:00</comment_date></row><row _id="row-33mz~nurg-rmbb" _uuid="00000000-0000-0000-81CA-50E134F1875D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-33mz~nurg-rmbb"><intent_id>618714</intent_id><project_id>729387</project_id><text_data>C &amp; R Tractor will be performing all aspects of landscape construction for this project.  These items are as follows:  hydro seed application; topsoil and compost placement; sod, arborist mulch and jute matting installation; irrigation; and planting.</text_data><comment_date>2014-03-04T00:00:00</comment_date></row><row _id="row-pmia~tnv3~q28y" _uuid="00000000-0000-0000-B9C6-E8CA22102B08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pmia~tnv3~q28y"><intent_id>668201</intent_id><project_id>748429</project_id><text_data>145336 Provide and install cat 6 cabling for camera&amp;#39;s. All cabling will be run indoors. Terminate test and label.</text_data><comment_date>2014-12-03T00:00:00</comment_date></row><row _id="row-n7dh.fgmh.c8g3" _uuid="00000000-0000-0000-1C26-1B551FC31588" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n7dh.fgmh.c8g3"><intent_id>781761</intent_id><project_id>795270</project_id><text_data>Work performed was to cut down trees and brush.  The only tools used by this contractor was chainsaws.  The rest of the tools and vehicles provided by the contractor.</text_data><comment_date>2016-08-19T00:00:00</comment_date></row><row _id="row-7r8z.kz9c-qfwy" _uuid="00000000-0000-0000-D810-3221B38262E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7r8z.kz9c-qfwy"><intent_id>743536</intent_id><project_id>782933</project_id><text_data>Oregon Employees Only - SAIF 811528</text_data><comment_date>2016-01-26T00:00:00</comment_date></row><row _id="row-zhav.cv4z-pbxu" _uuid="00000000-0000-0000-4A1A-E559483071A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhav.cv4z-pbxu"><intent_id>863884</intent_id><project_id>833018</project_id><text_data>WO #8026367</text_data><comment_date>2017-09-20T00:00:00</comment_date></row><row _id="row-9vn8-6289.hzrg" _uuid="00000000-0000-0000-2E3C-FD219E7890AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9vn8-6289.hzrg"><intent_id>1028649</intent_id><project_id>902939</project_id><text_data>#1 Replace bath fan/light combo &amp; Attic J-boxes. #2 Single family dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2019-12-25T00:00:00</comment_date></row><row _id="row-rmm3.tw9v_amwm" _uuid="00000000-0000-0000-60A0-88710B0505DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rmm3.tw9v_amwm"><intent_id>667281</intent_id><project_id>749510</project_id><text_data>All address are locate in the city of Tacoma.1.  Denise Stolaroff    4316 North 33rd Street2.  Irma Guzman    707 East Harrison3.  Norma Ward    4528 Fawcett Ave.</text_data><comment_date>2014-11-24T00:00:00</comment_date></row><row _id="row-yvca~vm4g.qbbn" _uuid="00000000-0000-0000-79A0-B78716B17345" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yvca~vm4g.qbbn"><intent_id>820829</intent_id><project_id>814230</project_id><text_data>Install topsoil, plants and bark at parking area</text_data><comment_date>2017-03-15T00:00:00</comment_date></row><row _id="row-q955~avye~9r86" _uuid="00000000-0000-0000-A72E-D1559F01B0D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q955~avye~9r86"><intent_id>1108369</intent_id><project_id>847594</project_id><text_data>120039-001</text_data><comment_date>2020-12-08T00:00:00</comment_date></row><row _id="row-hr2y_t264_qjeh" _uuid="00000000-0000-0000-974D-F7FED2248EA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hr2y_t264_qjeh"><intent_id>933442</intent_id><project_id>861664</project_id><text_data>#1 - Describe the work that your firm was contracted to perform INSULATION #2 - Is the structure a single family dwelling YES, duplex YES, apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have 1 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? YES #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2018-09-17T00:00:00</comment_date></row><row _id="row-ivms-3i3s~5sf6" _uuid="00000000-0000-0000-318D-317DB2D8FD17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ivms-3i3s~5sf6"><intent_id>497430</intent_id><project_id>678943</project_id><text_data>Kim Hunsaker2020 S. 1st Ave.Yakima, WA  98903</text_data><comment_date>2012-01-19T00:00:00</comment_date></row><row _id="row-dp8w-paga~wqn5" _uuid="00000000-0000-0000-C566-8CA24CC19758" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dp8w-paga~wqn5"><intent_id>1197547</intent_id><project_id>990599</project_id><text_data>Job# S12903S</text_data><comment_date>2021-12-07T00:00:00</comment_date></row><row _id="row-c3jg-3pqi-t6e2" _uuid="00000000-0000-0000-970B-85C5DBC35CB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c3jg-3pqi-t6e2"><intent_id>474200</intent_id><project_id>667152</project_id><text_data>This is a remodel of an existing fire station. Our portion consists of placing 4 inches of topsoil on any disturbed area, and hydro-seeding.</text_data><comment_date>2011-09-14T00:00:00</comment_date></row><row _id="row-5uif-67sm.4x5s" _uuid="00000000-0000-0000-7E81-A132B63E8774" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5uif-67sm.4x5s"><intent_id>899300</intent_id><project_id>848614</project_id><text_data>This job consists of pond cleaning &amp; Fencing; excavating water, removal of vegetation, remove trees &amp; stumps.  Repair damaged berms, restore pond bottom.  Remove split rail fence along retention pond perimeter. Install erosion control.</text_data><comment_date>2018-04-18T00:00:00</comment_date></row><row _id="row-vznd_spq7.p5hz" _uuid="00000000-0000-0000-3ADB-EF9230CDED4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vznd_spq7.p5hz"><intent_id>659321</intent_id><project_id>743860</project_id><text_data>054087</text_data><comment_date>2014-10-09T00:00:00</comment_date></row><row _id="row-4ac2~bux5~e4m9" _uuid="00000000-0000-0000-516C-249401D97227" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ac2~bux5~e4m9"><intent_id>764577</intent_id><project_id>791213</project_id><text_data>Renovation of Lecture Hall.</text_data><comment_date>2016-05-26T00:00:00</comment_date></row><row _id="row-22qm_srxz-y6fd" _uuid="00000000-0000-0000-B57E-A7D294889C8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22qm_srxz-y6fd"><intent_id>882308</intent_id><project_id>840928</project_id><text_data>ALLIED&amp;#39;S JOB # 171229-0031.219</text_data><comment_date>2018-01-08T00:00:00</comment_date></row><row _id="row-vpii~nyrr~rt6h" _uuid="00000000-0000-0000-D8EF-34826DECC0EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vpii~nyrr~rt6h"><intent_id>615369</intent_id><project_id>728749</project_id><text_data>Filed By: Sean Yoder</text_data><comment_date>2014-02-06T00:00:00</comment_date></row><row _id="row-y9m3~9rex.xytt" _uuid="00000000-0000-0000-13E4-D0FA6B55B603" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y9m3~9rex.xytt"><intent_id>1158176</intent_id><project_id>956847</project_id><text_data>Contract 10118Project 921300Pineda370 S. Reynolds Rd. #66Othello, WA 99344</text_data><comment_date>2021-07-07T00:00:00</comment_date></row><row _id="row-yg93~3hxu_pfch" _uuid="00000000-0000-0000-BEE8-752D014FADAF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yg93~3hxu_pfch"><intent_id>865827</intent_id><project_id>833799</project_id><text_data>164th Ave NE Redmond, WA 980521. Attic Blow, Wall Blow, Crawl Space, Duct Seal, Mechanical Ventilation 	2. Multi family	3. 2	4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No	5. Yes	6. Yes	7. Yes	8. No</text_data><comment_date>2017-09-28T00:00:00</comment_date></row><row _id="row-pbhd-icu6~5wdx" _uuid="00000000-0000-0000-5DE6-F716E7FEBA12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbhd-icu6~5wdx"><intent_id>815462</intent_id><project_id>758756</project_id><text_data>MEDICAL 7.70HOLIDAY  1.12VACATION 2.23PENSION 1.00</text_data><comment_date>2017-02-10T00:00:00</comment_date></row><row _id="row-hnpd.r5tn_ifgy" _uuid="00000000-0000-0000-281A-3E49CEB0CBBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hnpd.r5tn_ifgy"><intent_id>597074</intent_id><project_id>685131</project_id><text_data>HIRED BY MCCANN TRUCKING &amp; EXCAVATING</text_data><comment_date>2013-10-01T00:00:00</comment_date></row><row _id="row-jakf~zpsj-vd3v" _uuid="00000000-0000-0000-B1E4-56F9736EFB7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jakf~zpsj-vd3v"><intent_id>639580</intent_id><project_id>736262</project_id><text_data>Fringe Breakdown:$17.04---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $10.04 Pension$10.99---$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $3.99 Pension</text_data><comment_date>2014-07-08T00:00:00</comment_date></row><row _id="row-b6bs-frhp_6zny" _uuid="00000000-0000-0000-9403-0E39F3AE6914" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b6bs-frhp_6zny"><intent_id>683172</intent_id><project_id>757372</project_id><text_data>--3/17/15--ROBERTS1)Install an oil furnace2)YES3)1 STORY-WITH BASEMENT4)a-no b-no c-yes d-no e-no f-no g-no h-no I-no j-no k-none5)YES6)YES7)NO8)NO</text_data><comment_date>2015-03-11T00:00:00</comment_date></row><row _id="row-4e9r.8tjh_xh5e" _uuid="00000000-0000-0000-7F40-50815245B75A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4e9r.8tjh_xh5e"><intent_id>610578</intent_id><project_id>669545</project_id><text_data>ECI Job #8284</text_data><comment_date>2014-01-03T00:00:00</comment_date></row><row _id="row-nufy_pphz.xvbx" _uuid="00000000-0000-0000-B4C1-20BECE9CE32E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nufy_pphz.xvbx"><intent_id>615325</intent_id><project_id>728738</project_id><text_data>Other trucks include a Lowboy for mobilizing equipment, and a Water Truck for dust control (2500-4500 gallon).General Laborer performs tasks using a shovel, rake, wire cutters, and plyers.</text_data><comment_date>2014-05-06T00:00:00</comment_date></row><row _id="row-kn5m~6ymi~qmvt" _uuid="00000000-0000-0000-43E1-06026AE58BC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kn5m~6ymi~qmvt"><intent_id>492445</intent_id><project_id>671983</project_id><text_data>ICON Job# 210236</text_data><comment_date>2011-12-07T00:00:00</comment_date></row><row _id="row-u86q-xvyi~4xni" _uuid="00000000-0000-0000-C415-72A055121EF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u86q-xvyi~4xni"><intent_id>838360</intent_id><project_id>823337</project_id><text_data>We intend to utilize Laborers for demolition of the existing CMU wall, and also the existing handrail.  The general laborer will do debris removal, hauling out garbage, clean-up, and loading the trailer.  Ironworkers will perform the field welding on the handrail where required.  Painters will paint the handrail, and modified CMU wall.</text_data><comment_date>2017-06-09T00:00:00</comment_date></row><row _id="row-sa7c-q6tz.za2p" _uuid="00000000-0000-0000-572E-FFC606D872E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sa7c-q6tz.za2p"><intent_id>1113365</intent_id><project_id>945520</project_id><text_data>Manually Remove 2 Damaged Plants using Hand Shovel. Replace with 1 Otto Luken Laurels &amp; 1 Kinnickinnic Flatin.</text_data><comment_date>2021-01-06T00:00:00</comment_date></row><row _id="row-2gdr_sasq-ina9" _uuid="00000000-0000-0000-A2E2-94892F6725FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2gdr_sasq-ina9"><intent_id>1133641</intent_id><project_id>956965</project_id><text_data>Workers' Compensation Account ID is N/A. We are a Tribal entity that is self-insured through Tribal First. Please contact Megan Peterson at 360-464-2893, if you have any additional questions.</text_data><comment_date>2021-04-09T00:00:00</comment_date></row><row _id="row-xkfc.amxu.z9v9" _uuid="00000000-0000-0000-04B4-EAE3CE87F1E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xkfc.amxu.z9v9"><intent_id>729594</intent_id><project_id>768893</project_id><text_data>Fringe Package = Ind Acct Pension ($4.00) / Pension ($5.51) / Occ Health ($0.12) / Health ($8.84) / Apprenticeship ($0.50) / Industry Fund ($0.10) / LMCT ($0.05)</text_data><comment_date>2015-11-03T00:00:00</comment_date></row><row _id="row-ecqq-ebad~jiar" _uuid="00000000-0000-0000-DABC-CBFC84B8FB5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ecqq-ebad~jiar"><intent_id>934872</intent_id><project_id>862180</project_id><text_data>General Laborer will be assisting the welder with equipment and stabilizing the gate to be welded.</text_data><comment_date>2018-09-24T00:00:00</comment_date></row><row _id="row-jygw_v745-txek" _uuid="00000000-0000-0000-9535-6DAACF0ACA5B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jygw_v745-txek"><intent_id>736273</intent_id><project_id>760591</project_id><text_data>Filed by Karen AndersonProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24CFR 965 101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2015-12-04T00:00:00</comment_date></row><row _id="row-jbk4~nt4t_vzup" _uuid="00000000-0000-0000-4F74-1DF79651388D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jbk4~nt4t_vzup"><intent_id>606384</intent_id><project_id>724692</project_id><text_data>Elect Tech (06) Work - Cabling for Card Readers at 6 Locations. Work performed indoors</text_data><comment_date>2013-11-26T00:00:00</comment_date></row><row _id="row-z7ez.3pck-29pm" _uuid="00000000-0000-0000-5291-B5E82A905EFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7ez.3pck-29pm"><intent_id>653429</intent_id><project_id>739677</project_id><text_data>Owner/operator will perform dump truck services on this project.</text_data><comment_date>2014-09-09T00:00:00</comment_date></row><row _id="row-k77t.363d-hqv5" _uuid="00000000-0000-0000-17C1-9A9F789F99E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k77t.363d-hqv5"><intent_id>1052898</intent_id><project_id>895659</project_id><text_data>Hired by  MoncrieffProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 an 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2020-04-21T00:00:00</comment_date></row><row _id="row-5vfi_v4v5.rym8" _uuid="00000000-0000-0000-0474-5DBB75A32497" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vfi_v4v5.rym8"><intent_id>831502</intent_id><project_id>795932</project_id><text_data>PN # 28860 SEA</text_data><comment_date>2017-05-08T00:00:00</comment_date></row><row _id="row-9w2k-cgjm.myxm" _uuid="00000000-0000-0000-2817-9A11644451BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9w2k-cgjm.myxm"><intent_id>780669</intent_id><project_id>799138</project_id><text_data>&amp;quot;POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)&amp;quot; USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2016-08-08T00:00:00</comment_date></row><row _id="row-i78v_p9fh-9wp8" _uuid="00000000-0000-0000-C7C4-34CD67C2DC28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i78v_p9fh-9wp8"><intent_id>552205</intent_id><project_id>703171</project_id><text_data>MT West Employees are Idaho resisdents and covered By IDAHO State insurance fund.</text_data><comment_date>2013-01-16T00:00:00</comment_date></row><row _id="row-zms8_xyxe.w3vd" _uuid="00000000-0000-0000-888A-073D7FA106F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zms8_xyxe.w3vd"><intent_id>528129</intent_id><project_id>693708</project_id><text_data>Amount paid divided by hours worked</text_data><comment_date>2012-08-15T00:00:00</comment_date></row><row _id="row-txjn.63h4~hja2" _uuid="00000000-0000-0000-C148-CE725D183244" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-txjn.63h4~hja2"><intent_id>464158</intent_id><project_id>669410</project_id><text_data>Time and Material improvements to existing irrigation system at Seven Oaks Elementary School.  Landscape improvements at Olympic View Elementary School to include clear and grub of exisitng sod and weeds, plant trees and shrubs, install bark mulch.  Will use hand tools and equipment less than 90 hp.</text_data><comment_date>2011-07-19T00:00:00</comment_date></row><row _id="row-frjv-uywx.x5vf" _uuid="00000000-0000-0000-F550-D450DB711D3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-frjv-uywx.x5vf"><intent_id>1229521</intent_id><project_id>1010604</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. BCI Project No. ES9094Filed by Kathi Clark</text_data><comment_date>2022-04-28T00:00:00</comment_date></row><row _id="row-8sze~i626-yfhm" _uuid="00000000-0000-0000-6B0E-BCBBCE0336A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8sze~i626-yfhm"><intent_id>1161379</intent_id><project_id>960658</project_id><text_data>1. What is/was the specific purpose of this awarding agency's public works project? Provide and support a Building Management System 2. Does this project include fabrication, delivery, installation of non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. No 3. Does this specific project entail the remodeling or new construction of a facility? New Construction  4. If your firm is working upon a type of building system, what type of system is involved? Building Management System 5. What specific tasks will your employees perform? Engineering, programming, component testing and operation verification 6. What, if any, tools will your employees use in the performance of those tasks? Laptops and software. 7. If your employees will use no tools, will they engage in any other type of manual, hands on efforts completing their tasks? Interface to system using laptop computers and software for programming, checkout and commissioning. 8. Are you going to be hiring any subcontractors for this project? Yes 9. When is your work to be completed? Planning or pre-construction phase or during the public works project? During the public works project</text_data><comment_date>2021-07-19T00:00:00</comment_date></row><row _id="row-ift6.ce65_zwvn" _uuid="00000000-0000-0000-D1AC-1BEC91932683" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ift6.ce65_zwvn"><intent_id>808683</intent_id><project_id>810073</project_id><text_data>COV JOC Project</text_data><comment_date>2016-12-27T00:00:00</comment_date></row><row _id="row-p4j6~g3m9-j9ga" _uuid="00000000-0000-0000-5A70-25139204DF3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4j6~g3m9-j9ga"><intent_id>959274</intent_id><project_id>870280</project_id><text_data>We are non-union - Fringe benefits vary according to employee.  Washington Heating always pays a combination equaling the Designated Prev. Wage for Trade.  In this case, we will be paying a $82.51 with wages &amp; fringes combined.</text_data><comment_date>2019-02-07T00:00:00</comment_date></row><row _id="row-epg3~ta4h-pyhk" _uuid="00000000-0000-0000-4D0E-15E14E4CAF12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-epg3~ta4h-pyhk"><intent_id>1145013</intent_id><project_id>962564</project_id><comment_date>2021-05-17T00:00:00</comment_date></row><row _id="row-jt7t.q8jn~584q" _uuid="00000000-0000-0000-6465-9C5DA7591357" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jt7t.q8jn~584q"><intent_id>745291</intent_id><project_id>782364</project_id><text_data>Replace bath fan  &amp; switchSingle residential home</text_data><comment_date>2016-02-05T00:00:00</comment_date></row><row _id="row-seua.5aji-a9ub" _uuid="00000000-0000-0000-E768-8AD77A8A588D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-seua.5aji-a9ub"><intent_id>967158</intent_id><project_id>876485</project_id><text_data>PTI SO 146109</text_data><comment_date>2019-03-24T00:00:00</comment_date></row><row _id="row-5ixi_jg5k-qgfy" _uuid="00000000-0000-0000-95A8-E6D2FDE51214" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ixi_jg5k-qgfy"><intent_id>1242155</intent_id><project_id>1018129</project_id><text_data>#1- heat pump install; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2022-06-17T00:00:00</comment_date></row><row _id="row-a7rw-46hm~ziaq" _uuid="00000000-0000-0000-84A8-20AC21E687BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7rw-46hm~ziaq"><intent_id>1250253</intent_id><project_id>984578</project_id><text_data>Stoneway Concrete is a Material Supplier</text_data><comment_date>2022-07-19T00:00:00</comment_date></row><row _id="row-ee6k-7x6r.p467" _uuid="00000000-0000-0000-E03D-FBFDE6367B42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ee6k-7x6r.p467"><intent_id>969248</intent_id><project_id>862141</project_id><text_data>0719020</text_data><comment_date>2019-04-03T00:00:00</comment_date></row><row _id="row-hdjh_9aph.aw9m" _uuid="00000000-0000-0000-11C5-EB71307F8B5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hdjh_9aph.aw9m"><intent_id>1203506</intent_id><project_id>994470</project_id><text_data>9882302</text_data><comment_date>2022-01-10T00:00:00</comment_date></row><row _id="row-wv7z_wn2c-hbm4" _uuid="00000000-0000-0000-D9AF-3832F69CB657" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wv7z_wn2c-hbm4"><intent_id>1318279</intent_id><project_id>1062555</project_id><text_data>We are installing security cameras to the outside of the building.</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-zti2~fxnq.zzdt" _uuid="00000000-0000-0000-884F-5CFFEAFA0604" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zti2~fxnq.zzdt"><intent_id>868252</intent_id><project_id>814514</project_id><text_data>We are an Oregon employer with industrial insurance through SAIF.</text_data><comment_date>2017-10-10T00:00:00</comment_date></row><row _id="row-mzte_2fpu-x3m6" _uuid="00000000-0000-0000-BC8E-0ACB9082FCC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mzte_2fpu-x3m6"><intent_id>806025</intent_id><project_id>808835</project_id><text_data>DRAIN OLD GLYCOL SOLUTION AND FILL WITH NEW GLYCOL</text_data><comment_date>2016-12-07T00:00:00</comment_date></row><row _id="row-42kd.7kr8.px54" _uuid="00000000-0000-0000-2BA7-1E8E0F5D7D49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-42kd.7kr8.px54"><intent_id>529218</intent_id><project_id>694120</project_id><text_data>Ironworkers Fringe breakdown per Union #86 : Annuity $ 4.00, Health &amp; Welfare $6.52, Pension $ 8.95, Apprenticeship $ .63</text_data><comment_date>2012-08-20T00:00:00</comment_date></row><row _id="row-q3ea~7zui-rtiv" _uuid="00000000-0000-0000-E6AF-90569FA88AD2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q3ea~7zui-rtiv"><intent_id>823886</intent_id><project_id>816282</project_id><text_data>Project #CP5-ST-3A-14-06Fed Aid No. HSIP-3551(004)</text_data><comment_date>2017-03-31T00:00:00</comment_date></row><row _id="row-3igx_k5wc~gqb5" _uuid="00000000-0000-0000-FCDB-D03A9126EE8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3igx_k5wc~gqb5"><intent_id>956717</intent_id><project_id>864764</project_id><text_data>#2 residential triplexes#3 doesn't have any basements, only one storie#4 residentiala- nob- noc- yesd- noe- nof-  no g- noh - noI  - noj -  nok - no#5  yes#6  yes#7  no#8  yes</text_data><comment_date>2019-03-12T00:00:00</comment_date></row><row _id="row-xpcu~ig9x.fwcd" _uuid="00000000-0000-0000-E032-E0ED0E905B16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xpcu~ig9x.fwcd"><intent_id>1142587</intent_id><project_id>961232</project_id><text_data>VE # 30001229</text_data><comment_date>2021-05-06T00:00:00</comment_date></row><row _id="row-eytw~kf5x~szhp" _uuid="00000000-0000-0000-930F-D72AD4222379" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eytw~kf5x~szhp"><intent_id>634460</intent_id><project_id>736250</project_id><text_data>OTHER TRUCKS - WATER TANK TRUCK - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH WATER  FOR DUST CONTROLOTHER TRUCKS - OIL DISTRIBUTOR DRIVER - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH OIL/TACK PRIOR TO PLACING ASPHALT</text_data><comment_date>2014-06-11T00:00:00</comment_date></row><row _id="row-97e3~38dd.tgwn" _uuid="00000000-0000-0000-6DAF-4EC80F5722FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-97e3~38dd.tgwn"><intent_id>972353</intent_id><project_id>878768</project_id><text_data>Keep intent open until September 2019</text_data><comment_date>2019-04-19T00:00:00</comment_date></row><row _id="row-vn6r-wmcv-a2dx" _uuid="00000000-0000-0000-6487-F4D7847AA9E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vn6r-wmcv-a2dx"><intent_id>1178863</intent_id><project_id>980002</project_id><text_data>CAT 6 Cabling for Data Connections, Inside and outside cabling</text_data><comment_date>2021-09-28T00:00:00</comment_date></row><row _id="row-wpw2~7zcb_649g" _uuid="00000000-0000-0000-D84E-5D6043768AEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wpw2~7zcb_649g"><intent_id>779426</intent_id><project_id>798681</project_id><text_data>Wage rates revised to correct trade &amp; occupation level.</text_data><comment_date>2016-10-20T00:00:00</comment_date></row><row _id="row-eqpy_w3gg_u7fv" _uuid="00000000-0000-0000-DC23-92259B57A7E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eqpy_w3gg_u7fv"><intent_id>505543</intent_id><project_id>673150</project_id><text_data>RUBENCC038JA</text_data><comment_date>2012-04-02T00:00:00</comment_date></row><row _id="row-qptd~jwrf~vnvy" _uuid="00000000-0000-0000-0D56-B23F0260427F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qptd~jwrf~vnvy"><intent_id>450636</intent_id><project_id>658967</project_id><text_data>PRIEST RAPIDS DAM/HWY 243</text_data><comment_date>2011-04-11T00:00:00</comment_date></row><row _id="row-8u85-547p.n969" _uuid="00000000-0000-0000-EFA8-565CB595CE9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8u85-547p.n969"><intent_id>945356</intent_id><project_id>866287</project_id><text_data>Job 923827</text_data><comment_date>2018-11-12T00:00:00</comment_date></row><row _id="row-jh7d-qwsi-u9s7" _uuid="00000000-0000-0000-85AE-014D17798BEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jh7d-qwsi-u9s7"><intent_id>1083851</intent_id><project_id>930695</project_id><text_data>PC1Job #4291CB</text_data><comment_date>2020-08-27T00:00:00</comment_date></row><row _id="row-itsk_kegq~tnrv" _uuid="00000000-0000-0000-3D34-A99BA8DF4EEE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-itsk_kegq~tnrv"><intent_id>1248863</intent_id><project_id>1017261</project_id><text_data>Other Truck= LowboyOther Truck= Water Truck</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-3icr-zp9h_gsh3" _uuid="00000000-0000-0000-F79B-41A5EBB24F5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3icr-zp9h_gsh3"><intent_id>598780</intent_id><project_id>714452</project_id><text_data>123028</text_data><comment_date>2013-10-10T00:00:00</comment_date></row><row _id="row-gaym~tntc-pqxc" _uuid="00000000-0000-0000-51A2-8B4BE00481BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gaym~tntc-pqxc"><intent_id>1318460</intent_id><project_id>1062641</project_id><text_data>INV # 89673092 SR # 54343014</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-nh77-6iz9.kt2y" _uuid="00000000-0000-0000-079D-A14BCD51C588" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nh77-6iz9.kt2y"><intent_id>702448</intent_id><project_id>764055</project_id><text_data>This intent combines both projects Pioneer Elementary and Endeavour Elementary Portables.General Contractor-Schmid &amp; Sons, Inc.(WA UBI#): 602916898Hiring Contractor-Kitchen Electric LLC (WA UBI#): 603261292SimplexGrinnell (Our WA UBI#: 602113334</text_data><comment_date>2015-06-22T00:00:00</comment_date></row><row _id="row-9gp5-9ruw~3fd6" _uuid="00000000-0000-0000-342F-6008C9361CB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9gp5-9ruw~3fd6"><intent_id>816533</intent_id><project_id>813719</project_id><text_data>site states diesel #2 resetting. found reset process noisy and labored, removed all factory grease and sediment and debris and moving linkage. once dry lightly lubed all linkage and gear faces. pump is now resetting with ease and not hanging up. repeated process on D1 diesel.these are nozzles for pumping fuel in to vehicles (like at a gas station). which classification would you like me to use?</text_data><comment_date>2017-02-27T00:00:00</comment_date></row><row _id="row-9j24~h6wt~xzbc" _uuid="00000000-0000-0000-3A75-9BF5C940273D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9j24~h6wt~xzbc"><intent_id>959790</intent_id><project_id>872980</project_id><text_data>PTI SO 144277</text_data><comment_date>2019-02-11T00:00:00</comment_date></row><row _id="row-kefb.buk3-2aeh" _uuid="00000000-0000-0000-E243-AE306B982D6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kefb.buk3-2aeh"><intent_id>1059536</intent_id><project_id>919717</project_id><text_data>These are standard pickup trucks used solely for transport time to and from the job site.</text_data><comment_date>2020-05-28T00:00:00</comment_date></row><row _id="row-4dbg.qhjd.6r8i" _uuid="00000000-0000-0000-13C0-E2E306AE9357" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4dbg.qhjd.6r8i"><intent_id>831407</intent_id><project_id>820090</project_id><text_data>ALLIEDS JOB #170427-0022.219</text_data><comment_date>2017-05-05T00:00:00</comment_date></row><row _id="row-fkqs_zxw6-2qct" _uuid="00000000-0000-0000-B3AC-D270EDAB6260" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fkqs_zxw6-2qct"><intent_id>1077786</intent_id><project_id>883570</project_id><text_data>FRINGE BREAKDOWNLABORERS: $13.75H &amp; W  = $6.70Pension= $6.00                                                                                             Training= $0.95Trust     = $0.10 OPERATORS: $18.75H &amp; W  = $8.05Pension= $9.95Training= $0.75 TEAMSTERS: $18.15H &amp; W  = $10.30Pension= $ 7.20Training= $ 0.65</text_data><comment_date>2020-08-04T00:00:00</comment_date></row><row _id="row-yujn-jmxu.ntxc" _uuid="00000000-0000-0000-C133-5099114E96D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yujn-jmxu.ntxc"><intent_id>676421</intent_id><project_id>748478</project_id><text_data>Form filed by: Timothy O. Calhoun</text_data><comment_date>2015-01-26T00:00:00</comment_date></row><row _id="row-yh9h~i46z~ngc9" _uuid="00000000-0000-0000-4AEE-D92010B9ED4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yh9h~i46z~ngc9"><intent_id>674474</intent_id><project_id>753505</project_id><text_data>Install Insulation, Single Family, 2 Stories, No, No, Yes, No, No, No, No, No, No, No, No, Yes, Yes, No, No.</text_data><comment_date>2015-01-14T00:00:00</comment_date></row><row _id="row-nfwu-3eny.mdpn" _uuid="00000000-0000-0000-66BC-B85E82179C90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nfwu-3eny.mdpn"><intent_id>685652</intent_id><project_id>736621</project_id><text_data>301791</text_data><comment_date>2015-03-25T00:00:00</comment_date></row><row _id="row-bjwz.kap7~vtcz" _uuid="00000000-0000-0000-E983-AD7AE9EB096B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjwz.kap7~vtcz"><intent_id>573219</intent_id><project_id>712454</project_id><text_data>Data System.Telecom Tech (09) - Install 18 Cat6 drops in the computer labAll work will be performed inside</text_data><comment_date>2013-06-04T00:00:00</comment_date></row><row _id="row-55tw_zc2i.au8v" _uuid="00000000-0000-0000-2D3B-DCC54A44E33F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-55tw_zc2i.au8v"><intent_id>780410</intent_id><project_id>791361</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2016-08-07T00:00:00</comment_date></row><row _id="row-rf35-6peh~rq2u" _uuid="00000000-0000-0000-DCD5-072CF360997D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rf35-6peh~rq2u"><intent_id>1210436</intent_id><project_id>998889</project_id><text_data>It was brought to our attention after the fact that this was a prevailing wage job.</text_data><comment_date>2022-10-21T00:00:00</comment_date></row><row _id="row-wh8p_5urv.fvu8" _uuid="00000000-0000-0000-283D-7D7BF3C9DA86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wh8p_5urv.fvu8"><intent_id>1274038</intent_id><project_id>1034899</project_id><text_data>No one makes less than the required wages</text_data><comment_date>2022-10-11T00:00:00</comment_date></row><row _id="row-uvas_uryc~76iz" _uuid="00000000-0000-0000-E4D0-C61C405BD75B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uvas_uryc~76iz"><intent_id>1310894</intent_id><project_id>1057976</project_id><text_data>Project# 04218, Swall, Jon, 5731 N Milton St, Spokane, WA 99205</text_data><comment_date>2023-03-14T00:00:00</comment_date></row><row _id="row-disn.4uim~gbxk" _uuid="00000000-0000-0000-A35C-C44E69188C05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-disn.4uim~gbxk"><intent_id>1021637</intent_id><project_id>899190</project_id><text_data>#1 � The crew will be repairing the wooden wheel chair ramp.#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2019-11-14T00:00:00</comment_date></row><row _id="row-8fh5.9eqy_p5pr" _uuid="00000000-0000-0000-4508-B8ED4E7F5F90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8fh5.9eqy_p5pr"><intent_id>1262504</intent_id><project_id>974495</project_id><text_data>FRINGES ARE AS FOLLOWS:KENDALL HARTMAN: HW - $4.62 / PENSION - $1.32 / HOLIDAY - $1.69 / VACATION - $3.22TAYLOR JOHNSON: HW - $2.23 / HOLIDAY - $1.00 / VACATION - $1.00</text_data><comment_date>2022-08-30T00:00:00</comment_date></row><row _id="row-tbag_gmiu~wwu4" _uuid="00000000-0000-0000-7E3E-FBCFBE70C57D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tbag_gmiu~wwu4"><intent_id>1209724</intent_id><project_id>988949</project_id><text_data>#1 - Plumbing#2 - Residential Apartment#3 - 3#4 - Low Housing Residence(a). No(b). No(c). Not sure, if someone is permanent, but to my knowledge yes.(d). No(e). No(f). No(g). No(h). No(i).  No(j).  No(k). I believe so, we are doing the plumbing not renting.(l). Nothing in Other. #5 - Yes#6 - Yes#7 - I am not sure of the layout of that, but no plumbing is reflected. They only show a lobby on the plans. Each unit has its own laundry facility as well. Nothing multi-use per the plans. #8. I don't believe so, but again we followed the rules of the specs which guidelines residential rates. To my understanding, this is a Housing Authority of Snohomish County building and we are doing residential plumbing in that capacity. We are not doing any of the Civil Work and not providing any services outside of housing to my knowledge.</text_data><comment_date>2022-02-25T00:00:00</comment_date></row><row _id="row-57vt_93wi_ijzu" _uuid="00000000-0000-0000-9A34-400810B0A490" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-57vt_93wi_ijzu"><intent_id>1244263</intent_id><project_id>1019385</project_id><text_data>9893873</text_data><comment_date>2022-06-26T00:00:00</comment_date></row><row _id="row-ypr3.bujn_zsbm" _uuid="00000000-0000-0000-C954-E2CA969B0A54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ypr3.bujn_zsbm"><intent_id>724368</intent_id><project_id>773895</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2015-10-02T00:00:00</comment_date></row><row _id="row-5q38-tjue-2qkj" _uuid="00000000-0000-0000-F4FE-9A7156DF44E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5q38-tjue-2qkj"><intent_id>634601</intent_id><project_id>717319</project_id><text_data>Owner Operator worked on this project</text_data><comment_date>2014-06-12T00:00:00</comment_date></row><row _id="row-ic2i_vmyt-u2nx" _uuid="00000000-0000-0000-BE72-8F92D61AC29B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ic2i_vmyt-u2nx"><intent_id>843949</intent_id><project_id>824628</project_id><text_data>The $25.03 per hour fringe benefits breaks down as follows: $6.55 to annuity, $9.95 to pension, $7.52 to health and welfare, $0.30 to the Ironworkers Management Progressive Action Cooperative Trust, $0.69 to the apprenticeship fund, $0.02 to the Industry fund - Total $25.03</text_data><comment_date>2017-06-28T00:00:00</comment_date></row><row _id="row-5n27.nmn9_26bw" _uuid="00000000-0000-0000-6067-A9C503239946" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5n27.nmn9_26bw"><intent_id>574363</intent_id><project_id>708373</project_id><text_data>All Oregon Employees - SAIF 811528</text_data><comment_date>2013-06-11T00:00:00</comment_date></row><row _id="row-a5ia~a7uu-epcu" _uuid="00000000-0000-0000-BFB1-2AE79C66FD01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5ia~a7uu-epcu"><intent_id>1203697</intent_id><project_id>994589</project_id><text_data>Centennial project # 74780-0008</text_data><comment_date>2022-01-10T00:00:00</comment_date></row><row _id="row-yycq_r7z7.4d3e" _uuid="00000000-0000-0000-DABF-BC22798A4C27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yycq_r7z7.4d3e"><intent_id>746008</intent_id><project_id>784769</project_id><text_data>1. upgrade electrical service and wiring for bathroom remodel  2 single family dwelling  3. 1 story  4. a. no  b. no c. yes  d. no  e. no  f. no  g. no  h. no  I. no  j. no  k. no  5. yes  6. yes  7. no  8. no</text_data><comment_date>2016-02-10T00:00:00</comment_date></row><row _id="row-gfwx~rm5k-ruz9" _uuid="00000000-0000-0000-DB7F-581FE23B1D79" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfwx~rm5k-ruz9"><intent_id>982501</intent_id><project_id>883171</project_id><text_data>1. Duct Cleaning. 2. Mobile Home. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2019-06-05T00:00:00</comment_date></row><row _id="row-6w37~sbm8_3yhw" _uuid="00000000-0000-0000-8DFD-73D3441B6AA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6w37~sbm8_3yhw"><intent_id>540408</intent_id><project_id>698061</project_id><text_data>Form filed by: R T Vatne</text_data><comment_date>2012-10-17T00:00:00</comment_date></row><row _id="row-mwzy-dji4_ixrf" _uuid="00000000-0000-0000-2870-99BE17F01EC0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mwzy-dji4_ixrf"><intent_id>677455</intent_id><project_id>754915</project_id><text_data>Installation of DC power equipment at Rivercom&amp;#39;s 911 center</text_data><comment_date>2015-02-02T00:00:00</comment_date></row><row _id="row-rfsn-2zqz~3mux" _uuid="00000000-0000-0000-4EE0-A74B0FF967EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rfsn-2zqz~3mux"><intent_id>609452</intent_id><project_id>722446</project_id><text_data>Filed by Kim Burnside.</text_data><comment_date>2013-12-20T00:00:00</comment_date></row><row _id="row-bi2s-iqzw_su3i" _uuid="00000000-0000-0000-D971-CFA8B3CB9A26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bi2s-iqzw_su3i"><intent_id>903220</intent_id><project_id>820731</project_id><text_data>Type of work is Refrigerant AbatementTool used is an El MachinoA hose is attached to the appliance (McQuay Chiller) then to recovery machine (El Machino) which condenses the gas to a liquid and pumped into a refrigerant cylinder according to EPA regulationsWe do not do any repairs of any kind on any job site. The only service we provide is to recover the refrigerant put it in our cylinder and take the cylinder off site to our shop where it is later reclaimed.</text_data><comment_date>2018-05-08T00:00:00</comment_date></row><row _id="row-4j4y-jkiz_dykx" _uuid="00000000-0000-0000-5783-31B2CF7020EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4j4y-jkiz_dykx"><intent_id>1099941</intent_id><project_id>938229</project_id><text_data>Job # 36637-1</text_data><comment_date>2020-10-29T00:00:00</comment_date></row><row _id="row-iw5x_2nyd~dcw7" _uuid="00000000-0000-0000-62C0-88220759DDB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iw5x_2nyd~dcw7"><intent_id>682751</intent_id><project_id>755664</project_id><text_data>125005</text_data><comment_date>2015-03-10T00:00:00</comment_date></row><row _id="row-sddz_qp2j.v6je" _uuid="00000000-0000-0000-B0C6-ECD29BB6F028" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sddz_qp2j.v6je"><intent_id>1004568</intent_id><project_id>882519</project_id><text_data>Atkinson job# 150358trucks - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2019-09-04T00:00:00</comment_date></row><row _id="row-y3zz.ts8n~qnp2" _uuid="00000000-0000-0000-1A7C-74ADABE64860" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y3zz.ts8n~qnp2"><intent_id>517015</intent_id><project_id>689644</project_id><text_data>Filed by: Freida Zaviski</text_data><comment_date>2012-06-15T00:00:00</comment_date></row><row _id="row-e3zw-5qrg~zyeu" _uuid="00000000-0000-0000-6E9C-D670B8E94771" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e3zw-5qrg~zyeu"><intent_id>467315</intent_id><project_id>670584</project_id><text_data>Janitorial Service Agreement</text_data><comment_date>2011-07-21T00:00:00</comment_date></row><row _id="row-bujn-295e.fvum" _uuid="00000000-0000-0000-69C3-AC88B0654F32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bujn-295e.fvum"><intent_id>730597</intent_id><project_id>776345</project_id><text_data>1)We were contracted to repair the furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2015-11-09T00:00:00</comment_date></row><row _id="row-cr2p.an3n~9mui" _uuid="00000000-0000-0000-CE88-F957678E74D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cr2p.an3n~9mui"><intent_id>1015769</intent_id><project_id>893576</project_id><text_data>Electrical 2. Residence 3.1 4. residence a)n b)n c)y d)n e)n f)n g)n h)n i)n j)n k)n l)n 5) y 6)y 7)n 8)n</text_data><comment_date>2019-10-16T00:00:00</comment_date></row><row _id="row-786r-qdna_4b2v" _uuid="00000000-0000-0000-5AFD-F5BDF0455A64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-786r-qdna_4b2v"><intent_id>897577</intent_id><project_id>835747</project_id><text_data>This project is the construction of a new Early Learning Center school building in Shoreline.  Our work includes the preparation of soil for plantings, and seed or sod. We will install an underground sprinkler system less than 3 feet. We will trench by hand using shovels and a mini excavator under 90 hp to 12&amp;quot; to 18&amp;quot; . We will install PVC pipe, sprinkler heads backfilling the trench with 3&amp;quot; sand using a backhoe under 90 hp. For landscaping, we will place 8&amp;quot; of planting topsoil down, plant trees, shrubs and ground cover using both a mini excavator and backhoe, both under 90 hp</text_data><comment_date>2018-04-09T00:00:00</comment_date></row><row _id="row-zgkv~ti7k_qxna" _uuid="00000000-0000-0000-D3DD-4344239CD943" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zgkv~ti7k_qxna"><intent_id>942416</intent_id><project_id>853572</project_id><text_data>I am the owner of my company and no other employees worked with me.  I provided lift director services to the crane operator and tree climber/rigger to assist with rigging placement in cutting down a linden tree.  I also drove a truck to haul the trunk wood pieces away.</text_data><comment_date>2018-10-28T00:00:00</comment_date></row><row _id="row-j34f~c5zw-bhhv" _uuid="00000000-0000-0000-8CF8-4E484BD955A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j34f~c5zw-bhhv"><intent_id>1033423</intent_id><project_id>905449</project_id><text_data>This is an addition that is being built on an existing school.  Our responsibilities will be to install new sprinklers, sod and patio pavers.</text_data><comment_date>2020-01-23T00:00:00</comment_date></row><row _id="row-6j7h-m2gk.a535" _uuid="00000000-0000-0000-BBEE-D15E3BC83770" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6j7h-m2gk.a535"><intent_id>633045</intent_id><project_id>735471</project_id><text_data>Temporary fencing and permanent fencing</text_data><comment_date>2014-06-04T00:00:00</comment_date></row><row _id="row-prnr_dvmb~k9tb" _uuid="00000000-0000-0000-017E-3E1CEB33A5D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prnr_dvmb~k9tb"><intent_id>630647</intent_id><project_id>735364</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2014-05-30T00:00:00</comment_date></row><row _id="row-rga9-hk5a.nmhm" _uuid="00000000-0000-0000-1CA8-3EF212E671F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rga9-hk5a.nmhm"><intent_id>1269281</intent_id><project_id>1028666</project_id><text_data>inland job# 362229trucks - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2022-09-24T00:00:00</comment_date></row><row _id="row-mfxc.zwus_k3az" _uuid="00000000-0000-0000-EF5E-D47347079816" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mfxc.zwus_k3az"><intent_id>966146</intent_id><project_id>871040</project_id><text_data>? Installation of Cat6A F/UTP cabling per section 27 05 00 and sheets E5.01 &amp; E5.03. 								? Proposal assumes an existing 2-post equipment rack in the MDF will be populated with new 48-port patch panels and 2RU horizontal cable managers.</text_data><comment_date>2019-03-19T00:00:00</comment_date></row><row _id="row-8kgg-6p7j.45sg" _uuid="00000000-0000-0000-AA50-764BFE3D5253" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8kgg-6p7j.45sg"><intent_id>762225</intent_id><project_id>792021</project_id><text_data>Filed by Tammy JohnsonDeliver radio equipment, place antenna and install base station radio. Program all radios. Test Coverage.</text_data><comment_date>2016-05-16T00:00:00</comment_date></row><row _id="row-pszj~bb6g_vpu4" _uuid="00000000-0000-0000-94BB-6C34797EC493" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pszj~bb6g_vpu4"><intent_id>511404</intent_id><project_id>680918</project_id><text_data>Test, Adjust &amp; Balance  Specification 230593</text_data><comment_date>2012-05-10T00:00:00</comment_date></row><row _id="row-nksy.ncpc_fbk9" _uuid="00000000-0000-0000-2F18-A2097E5D1BBC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nksy.ncpc_fbk9"><intent_id>1252920</intent_id><project_id>1023869</project_id><text_data>Haz Waste workers to clean and disinfect area using rags/sponges/mops</text_data><comment_date>2022-07-28T00:00:00</comment_date></row><row _id="row-3ig7_48y3~jfer" _uuid="00000000-0000-0000-C512-BBFCD4D69C8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ig7_48y3~jfer"><intent_id>882899</intent_id><project_id>826598</project_id><text_data>Project is work on new track and filed around the school. Our scope will be to hydroseed lawn areas around the worksite with a 75hp Bowie Hydroseeder.</text_data><comment_date>2018-01-11T00:00:00</comment_date></row><row _id="row-92ki_5ugm_3mms" _uuid="00000000-0000-0000-1D0A-20A0BFF18C2D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-92ki_5ugm_3mms"><intent_id>1109122</intent_id><project_id>943112</project_id><text_data>Blythe work order 92444^</text_data><comment_date>2020-12-10T00:00:00</comment_date></row><row _id="row-bm78~2r27.245g" _uuid="00000000-0000-0000-E25F-181D1A2369B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bm78~2r27.245g"><intent_id>575778</intent_id><project_id>713469</project_id><text_data>Subcontactor = Masterwire Electric UBI#601-692-061 License# MASTEEI998DL</text_data><comment_date>2013-06-20T00:00:00</comment_date></row><row _id="row-prh5.yvn4_uawf" _uuid="00000000-0000-0000-A1A2-CC4D864849CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prh5.yvn4_uawf"><intent_id>985246</intent_id><project_id>883902</project_id><text_data>2018 WR / 2019 FringeTruck Drivers 'Other Trucks' classification is for Sweeper, Water &amp; Lowboy Trucks.</text_data><comment_date>2019-06-17T00:00:00</comment_date></row><row _id="row-e58p_wzeh_ws68" _uuid="00000000-0000-0000-5838-344CA1B09535" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e58p_wzeh_ws68"><intent_id>596587</intent_id><project_id>720987</project_id><text_data>Job # 201310</text_data><comment_date>2013-09-30T00:00:00</comment_date></row><row _id="row-hjxa~stsd.k9hv" _uuid="00000000-0000-0000-66F0-2B9CD45A37F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjxa~stsd.k9hv"><intent_id>779491</intent_id><project_id>798708</project_id><text_data>Job # 201339-008</text_data><comment_date>2016-08-03T00:00:00</comment_date></row><row _id="row-uzp7_vq34.va2k" _uuid="00000000-0000-0000-089C-11A1E694E80A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzp7_vq34.va2k"><intent_id>563557</intent_id><project_id>707328</project_id><text_data>Filed by Kurt Ganson</text_data><comment_date>2013-04-08T00:00:00</comment_date></row><row _id="row-g25q-i5vb~89mu" _uuid="00000000-0000-0000-8964-745C4A0090ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g25q-i5vb~89mu"><intent_id>1154679</intent_id><project_id>958740</project_id><text_data>120890-001</text_data><comment_date>2021-06-22T00:00:00</comment_date></row><row _id="row-gehn_edap-f59n" _uuid="00000000-0000-0000-BF97-B667C7E70A87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gehn_edap-f59n"><intent_id>1045119</intent_id><project_id>895659</project_id><text_data>Davis Bacon Wage Rates General Decision Number: WA20180116Construction Type: Residential Siding Installation, Window installation, Sheet Metal installationResidential construction project (consisting of single family homes and apartments up to and including 4 stories)Others  (consisting of single family homes and apartments up to and including 4 stories)N/AN/AN/AN/AKing County Carpenter:                                          Rate $24.57    Fringes $4.86Laborer                                               Rate $18.41    Fringes $3.20Glazier                                                Rate $29.28    Fringes $12.66 Residential Sheet Metal Workers       Rate $49.85    Fringes $26.60Please use these numbers as a Wage Rate looks different from the web site.</text_data><comment_date>2020-03-12T00:00:00</comment_date></row><row _id="row-6bs4_isjq_gw7j" _uuid="00000000-0000-0000-4229-C5DC1162D1C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6bs4_isjq_gw7j"><intent_id>1226240</intent_id><project_id>1006500</project_id><text_data>Kathy Garcia	1112 Long Rd #10, Centralia, WA 985311 Heating system 2 Single family dwelling ,3 single story 4 Residence  A-7 No Single family home only</text_data><comment_date>2022-04-18T00:00:00</comment_date></row><row _id="row-ndey~ux73_k5g7" _uuid="00000000-0000-0000-CDD9-B6402025BEE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ndey~ux73_k5g7"><intent_id>641785</intent_id><project_id>739608</project_id><text_data>H&amp;W-$8.66, Pension-$10.7, Training-$1.48, Other(Industry Inprovement Trust)-$0.30</text_data><comment_date>2014-07-17T00:00:00</comment_date></row><row _id="row-fyij-y8wx~34vg" _uuid="00000000-0000-0000-58AF-5E505B610B7F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fyij-y8wx~34vg"><intent_id>1120095</intent_id><project_id>949315</project_id><text_data>Corrected wages and benefits for worker #2.</text_data><comment_date>2021-03-05T00:00:00</comment_date></row><row _id="row-sn8r-2iba-b3kh" _uuid="00000000-0000-0000-827F-FD669E8D631F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sn8r-2iba-b3kh"><intent_id>880382</intent_id><project_id>837915</project_id><text_data>Job #F3494</text_data><comment_date>2017-12-21T00:00:00</comment_date></row><row _id="row-t5f9_kxec_f26u" _uuid="00000000-0000-0000-6FDB-3C3A0B91E1AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t5f9_kxec_f26u"><intent_id>1269546</intent_id><project_id>1027046</project_id><text_data>Corrected error in wage.  The beautification of a plot of land through addition of or modification to lawns, trees and bushes under the Landscape Construction Scope of work (WAC 296-127-01346) is a limited universe and has exclusions that may affect its application. Please provide L&amp;I with more information so we can verify whether the landscape construction wage rates apply to this project. A) Please describe the whole project � not just your part. B) Please describe your part(s) of the project �the tasks you performed, equipment used, and tools used. Please provide as much detail as you can. If the project involves installing an irrigation system, trenching, installing French drains or other subsurface water collection systems, or spreading top soil or mulch, please tell us the relevant depths. This is a routine inquiry. Your cooperation is appreciated!</text_data><comment_date>2022-10-17T00:00:00</comment_date></row><row _id="row-b5sj-epxp_zje9" _uuid="00000000-0000-0000-305D-2BFCCEEF7803" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b5sj-epxp_zje9"><intent_id>719038</intent_id><project_id>757361</project_id><text_data>Fringes:  Health = $6.15, Pension = $4.35, Training = $0.35</text_data><comment_date>2015-09-04T00:00:00</comment_date></row><row _id="row-4cfg_dc5u_mk2i" _uuid="00000000-0000-0000-5DBE-F905730722E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4cfg_dc5u_mk2i"><intent_id>985977</intent_id><project_id>878729</project_id><text_data>Filed by Robin RomansACI # 19-011</text_data><comment_date>2019-06-19T00:00:00</comment_date></row><row _id="row-t4n3_k9jy~saxu" _uuid="00000000-0000-0000-7C44-BEBCB9DA158B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t4n3_k9jy~saxu"><intent_id>874002</intent_id><project_id>837105</project_id><text_data>GOLD BAR ES, #29845-1</text_data><comment_date>2017-11-09T00:00:00</comment_date></row><row _id="row-eesc.6ekp~hn7d" _uuid="00000000-0000-0000-8562-63ABFA8D93E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eesc.6ekp~hn7d"><intent_id>622248</intent_id><project_id>731859</project_id><text_data>1.)Replaced water heater flex connector - cold side only2.) Single family residential mobile home3.)14.)a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no5.) yes6.) yes7.) yes, mobile home parks manager8.) no</text_data><comment_date>2014-03-27T00:00:00</comment_date></row><row _id="row-cf8k_ajsr~cndz" _uuid="00000000-0000-0000-9878-E84ED9467877" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cf8k_ajsr~cndz"><intent_id>1247877</intent_id><project_id>968137</project_id><text_data>SPM #27053</text_data><comment_date>2022-07-11T00:00:00</comment_date></row><row _id="row-wnj9.xiv5_m6tv" _uuid="00000000-0000-0000-8114-00938B757B95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wnj9.xiv5_m6tv"><intent_id>519296</intent_id><project_id>690538</project_id><text_data>This is on different sites in King County.  We are removing Ivy off trees and Ground.  (picks and me</text_data><comment_date>2012-06-27T00:00:00</comment_date></row><row _id="row-pr4i_ik47~phmd" _uuid="00000000-0000-0000-FB83-111DE002121B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pr4i_ik47~phmd"><intent_id>609705</intent_id><project_id>726219</project_id><text_data>Filed by Kevin Pollock</text_data><comment_date>2013-12-23T00:00:00</comment_date></row><row _id="row-4yua-y5mb~3cmc" _uuid="00000000-0000-0000-446F-1BC09E43DE98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4yua-y5mb~3cmc"><intent_id>702749</intent_id><project_id>758756</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2015-06-23T00:00:00</comment_date></row><row _id="row-rywf-gu6w_eh55" _uuid="00000000-0000-0000-8CA4-EB8344F8E09E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rywf-gu6w_eh55"><intent_id>651683</intent_id><project_id>743271</project_id><text_data>#1 - heat pump installation #2 - single family dwelling #3 - 1 #4 - residence (a) no c) yes (d)no  (e) no (f) no (g)no (h)no (i) no (j) no (k) no #5 - yes #6 - yes #7 - no #8 - no</text_data><comment_date>2014-09-01T00:00:00</comment_date></row><row _id="row-4nm9.hb5t.3eyq" _uuid="00000000-0000-0000-27AA-19D006AC273F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4nm9.hb5t.3eyq"><intent_id>1105864</intent_id><project_id>920075</project_id><comment_date>2021-02-05T00:00:00</comment_date></row><row _id="row-fnre~ax8b~gp7h" _uuid="00000000-0000-0000-38F7-89063A2DF855" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fnre~ax8b~gp7h"><intent_id>896651</intent_id><project_id>847487</project_id><text_data>Unit D 302 Replace green board ,install new one piece tub surround.</text_data><comment_date>2018-04-04T00:00:00</comment_date></row><row _id="row-diga~faht.b3ww" _uuid="00000000-0000-0000-FCCD-52152BE4757A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-diga~faht.b3ww"><intent_id>750702</intent_id><project_id>786923</project_id><text_data>This project for a 1 year on call electrician services for the Klickitat County Building &amp; Grounds Department performing new installation and repairs of existing wiring as seen fit by the Project Engineer.Electrical Fixture Maintenance Workers will be replacing and upgrading fixtures through out various Klickitat County Structures. Vehicles being used will be Rimrock Electric company vehicles and tools will be various cordless and power tools along with electrician specific handtools.</text_data><comment_date>2016-03-28T00:00:00</comment_date></row><row _id="row-ujin.7nrt~wcku" _uuid="00000000-0000-0000-9966-5D76CF463ABB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ujin.7nrt~wcku"><intent_id>569742</intent_id><project_id>709535</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2014-09-12T00:00:00</comment_date></row><row _id="row-efn3~r35s_vz8z" _uuid="00000000-0000-0000-B14F-6D9B68255D85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efn3~r35s_vz8z"><intent_id>790899</intent_id><project_id>803071</project_id><text_data>1.Weatherize Home2.Single Family Dwelling3.One Level4.a.no b.no c.yes d.no e.no f.no g.no h.no i.no j.no k.no 5.yes6.yes7.no8.no</text_data><comment_date>2016-09-21T00:00:00</comment_date></row><row _id="row-p65a.4mgi.88if" _uuid="00000000-0000-0000-99A7-7591DDFB3BDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p65a.4mgi.88if"><intent_id>1273154</intent_id><project_id>1034551</project_id><text_data>9900860</text_data><comment_date>2022-10-09T00:00:00</comment_date></row><row _id="row-wmnp~rkcj_vfkg" _uuid="00000000-0000-0000-FBA9-802DA42EA43A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wmnp~rkcj_vfkg"><intent_id>1281803</intent_id><project_id>1000559</project_id><text_data>2220101 - C-Tran 18th St. TI #2021-51</text_data><comment_date>2022-11-07T00:00:00</comment_date></row><row _id="row-baad-zch2.qey3" _uuid="00000000-0000-0000-06CA-913AFF821C10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-baad-zch2.qey3"><intent_id>999546</intent_id><project_id>890227</project_id><text_data>Telecommunication wi-fi cablingall work will be done indoors</text_data><comment_date>2019-08-14T00:00:00</comment_date></row><row _id="row-c3p7_ibd6_32a6" _uuid="00000000-0000-0000-A692-EC16D65F23B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c3p7_ibd6_32a6"><intent_id>738666</intent_id><project_id>781253</project_id><text_data>inv 53406- Emerg Service Call</text_data><comment_date>2015-12-21T00:00:00</comment_date></row><row _id="row-v3nc-k4fz-n4wd" _uuid="00000000-0000-0000-1146-E088724DA624" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3nc-k4fz-n4wd"><intent_id>743641</intent_id><project_id>783654</project_id><text_data>Estimate #14684</text_data><comment_date>2016-01-27T00:00:00</comment_date></row><row _id="row-krdn~cpdh.yfiu" _uuid="00000000-0000-0000-8BD9-FCF38D36F5CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-krdn~cpdh.yfiu"><intent_id>446366</intent_id><project_id>492255</project_id><text_data>Does this project utilize American Recovery and Reinvestment Act (ARRA) funds? No.Does this project utilize any weatherization or energy efficiency upgrade funds (ARRA or otherwise)? No.</text_data><comment_date>2011-03-24T00:00:00</comment_date></row><row _id="row-smyr_kjyh_asui" _uuid="00000000-0000-0000-2118-73F128B13186" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-smyr_kjyh_asui"><intent_id>1259930</intent_id><project_id>1027493</project_id><text_data>9899937</text_data><comment_date>2022-08-21T00:00:00</comment_date></row><row _id="row-x9h5.e6kc_458c" _uuid="00000000-0000-0000-B3B3-4BEDF5F77FCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x9h5.e6kc_458c"><intent_id>948445</intent_id><project_id>867680</project_id><text_data>Project deals with the control of aquatic weeds with the use of Herbicides. There is not a classification for this work group but we have been approved for over ten years as Landscape Laborers through L&amp;I. Our crews apply material to the water directly. We do not use any handheld equipment such as rakes or shovels, we do not dig or plant anything. Simply apply approved materials to the water in compliance with all state laws and regulations.</text_data><comment_date>2018-11-30T00:00:00</comment_date></row><row _id="row-pmcp-vrxs~a58q" _uuid="00000000-0000-0000-0929-C75AAD1346E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pmcp-vrxs~a58q"><intent_id>976454</intent_id><project_id>880514</project_id><text_data>No contract number provided by the customer for this project.</text_data><comment_date>2019-05-07T00:00:00</comment_date></row><row _id="row-jzjc~svaz.ud3g" _uuid="00000000-0000-0000-DD19-77CBA9EDD08F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzjc~svaz.ud3g"><intent_id>687786</intent_id><project_id>759412</project_id><text_data>Swept both PUD lots.</text_data><comment_date>2015-04-07T00:00:00</comment_date></row><row _id="row-8cpa.397k.x6wn" _uuid="00000000-0000-0000-D22C-192A46587DA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8cpa.397k.x6wn"><intent_id>671493</intent_id><project_id>751541</project_id><text_data>Level, form and pour concrete sidewalk and install irrigation system using concrete finishing tools, walk-behind trencher, wheel barrow and hand tools. The prevailing wage rate for cement masons at the time of contract was awarded was $34.48; I am unable to enter that wage and continue with processing, therefore I entered the current rate.</text_data><comment_date>2014-12-29T00:00:00</comment_date></row><row _id="row-zgrs.5k5x_jh7s" _uuid="00000000-0000-0000-5657-1E4E2F51F054" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zgrs.5k5x_jh7s"><intent_id>590926</intent_id><project_id>712010</project_id><text_data>Fringe BreakdownLABORERS:  $10.70H &amp; W   = $5.70Pension = $4.50Training= $0.45Trust     = $0.05OPERATORS:  $12.90H &amp; W   = $5.60Pension = $6.75Training= $0.55TEAMSTERS:  $14.44H &amp; W   = $8.86Pension = $5.33Training= $0.25</text_data><comment_date>2013-08-29T00:00:00</comment_date></row><row _id="row-hrxy-gdyx_2ycq" _uuid="00000000-0000-0000-D2B7-7455BA3BC7E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hrxy-gdyx_2ycq"><intent_id>723897</intent_id><project_id>773703</project_id><text_data>GENERAL LABORERS USE HAND TOOLS SUCH AS SHOVELS AND RAKE AND DO MANUAL TASKS SUCH AS INSTALLING SILT FENCE AND HAY. OTHER TRUCKS INCLUDE LOWBOY AND/OR WATERTRUCKS.</text_data><comment_date>2015-09-30T00:00:00</comment_date></row><row _id="row-p28h_67kt~62qp" _uuid="00000000-0000-0000-0CF5-0828812850D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p28h_67kt~62qp"><intent_id>1363969</intent_id><project_id>1087395</project_id><text_data>SOLENOID 66 LOCATED AT THE 6TH FLOOR CENTER MEZZANINE DID NOT OPERATE. WORK WAS PERFORMED INDOORS</text_data><comment_date>2023-09-28T00:00:00</comment_date></row><row _id="row-wa8x-t9vn_vg5s" _uuid="00000000-0000-0000-9E7B-2E7EB8A00CFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wa8x-t9vn_vg5s"><intent_id>661315</intent_id><project_id>747021</project_id><text_data>System Type:  LANTelecom Tech (09)  to reterminate fiber optic cableInside work</text_data><comment_date>2014-11-04T00:00:00</comment_date></row><row _id="row-ji99~jisp_swxs" _uuid="00000000-0000-0000-53C3-3CE273BF90BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ji99~jisp_swxs"><intent_id>1240492</intent_id><project_id>1017186</project_id><text_data>Please note this information is intended for projected/estimated repairs/service/installs of kitchen equipment service prior to dispatching technicians and is based on the customer�s request for service. Submitted for the purpose of obtaining the L&amp;I �Intent� and compliance. Upon completion of the service request, we will file the �Avadavat� confirming actual services preformed, labor hours and notation of any additional tools used outside of the general tools listed below.    General tools used by our technicians for plumbing/pipefitters equipment service: Pipe wrench, channel locks, thread tape, silicone gun, Phillips�s screwdriver, flathead screwdriver, putty knife, ball pin hammer.   General tools used by our technicians for electrical component equipment service: Multi-Meter, insulated screwdriver, wire nuts, safety locks for lockout/tagout, insulated Allen wrenches.   General Installation tools used by our technicians: cordless drill, multi screwdriver, ball pin hammer, small floor jack, silicone gun, floor dollies, channel locks, Sawzall, pry bar   All technicians use company supplied vehicles to arrive at job site</text_data><comment_date>2022-06-10T00:00:00</comment_date></row><row _id="row-bpiz.ik59_fg9b" _uuid="00000000-0000-0000-CA51-825D48F6AABA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bpiz.ik59_fg9b"><intent_id>912040</intent_id><project_id>853308</project_id><text_data>Billing Address:P.O. Box 68847Seattle, WA, 98168</text_data><comment_date>2018-08-22T00:00:00</comment_date></row><row _id="row-52ns_hck5-7p9h" _uuid="00000000-0000-0000-7CA9-8AB7E4756134" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-52ns_hck5-7p9h"><intent_id>1032884</intent_id><project_id>905245</project_id><comment_date>2020-01-21T00:00:00</comment_date></row><row _id="row-axin.7hic~pm6t" _uuid="00000000-0000-0000-FBF5-655192AE8D28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-axin.7hic~pm6t"><intent_id>959316</intent_id><project_id>872772</project_id><text_data>PC6 - Job #901-25CB</text_data><comment_date>2019-02-07T00:00:00</comment_date></row><row _id="row-6up5.khcr~j2b3" _uuid="00000000-0000-0000-3E5A-FA9AF8C78C46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6up5.khcr~j2b3"><intent_id>530716</intent_id><project_id>692398</project_id><text_data>Breakdown as follows:Health &amp; Security - $7.55Pension - $7.65Apprentice/Training - $.70</text_data><comment_date>2012-08-24T00:00:00</comment_date></row><row _id="row-x52x-c66w.yi76" _uuid="00000000-0000-0000-3733-0649E0FA52DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x52x-c66w.yi76"><intent_id>569582</intent_id><project_id>710982</project_id><text_data>HIF # 1543BIGELOW3845</text_data><comment_date>2013-05-14T00:00:00</comment_date></row><row _id="row-bj7p-fe9n_7u6i" _uuid="00000000-0000-0000-95E5-EB253F11B44C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bj7p-fe9n_7u6i"><intent_id>1156008</intent_id><project_id>943531</project_id><text_data>Truck other is non cdl 26K GVW flatbed for hauling seederlandscape labor is planting grass.</text_data><comment_date>2021-06-28T00:00:00</comment_date></row><row _id="row-g9fj~pr9f~5st2" _uuid="00000000-0000-0000-36AA-C5E87C2147B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g9fj~pr9f~5st2"><intent_id>1194358</intent_id><project_id>988698</project_id><text_data>Single family residence weatherization / insulation upgrade</text_data><comment_date>2021-11-18T00:00:00</comment_date></row><row _id="row-ncab_d39t-96pk" _uuid="00000000-0000-0000-9F2C-F68D202185F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ncab_d39t-96pk"><intent_id>561325</intent_id><project_id>707360</project_id><text_data>NWC 3764</text_data><comment_date>2013-03-25T00:00:00</comment_date></row><row _id="row-vy2b~vv47.w242" _uuid="00000000-0000-0000-8B52-FFADB6E4CB88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vy2b~vv47.w242"><intent_id>835539</intent_id><project_id>818382</project_id><text_data>HIRED BY SUB RCNW</text_data><comment_date>2017-05-22T00:00:00</comment_date></row><row _id="row-t7ts-y89q~2zci" _uuid="00000000-0000-0000-8CC7-FB2CCDEF4766" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t7ts-y89q~2zci"><intent_id>1234214</intent_id><project_id>1013644</project_id><text_data>Deliver and install plant material to the parking lot ornamental beds. Deliver and install beauty bark. No heavy equipment, only hand tools.</text_data><comment_date>2022-05-17T00:00:00</comment_date></row><row _id="row-xg7m_qanm.h5q4" _uuid="00000000-0000-0000-9DD2-CD8352A2B75D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xg7m_qanm.h5q4"><intent_id>885468</intent_id><project_id>842402</project_id><text_data>3 Year Eaton UPS and Battery Service Contract for SN: EV322ZBA14Service Contract includes: FL87NXXX-0080  Flex: 8 Hr Rsp, 7x24 Cvg Only0005NXXX-0080  UPS Preventive Maintenance, After Hours (7x24)0005NS040  Sealed Battery Preventive Maintenance, Anytime</text_data><comment_date>2018-01-26T00:00:00</comment_date></row><row _id="row-d7ym~8xwn_gqdw" _uuid="00000000-0000-0000-6AA0-CD66B61B42B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7ym~8xwn_gqdw"><intent_id>480136</intent_id><project_id>669658</project_id><text_data>THE PRIME HIRED US</text_data><comment_date>2011-09-26T00:00:00</comment_date></row><row _id="row-nfpk-k8va-73p4" _uuid="00000000-0000-0000-E55B-90941E6EDD63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nfpk-k8va-73p4"><intent_id>1216985</intent_id><project_id>921087</project_id><text_data>Operators6.97(Health)+15.65(Pension)+.70(Apprentice)+.05(Training)=23.37 Total Union FringesLaborers7.20(Health)+5.04(Pension)+.95(Apprentice)+.14(Northwest Laborers-Employers Cooperation and Education Team)=13.33 Total Union FringesPile Driver8.7(Health)+9.35(Retirement)+.85(Apprentice)=18.90 Total Union Fringes</text_data><comment_date>2022-04-20T00:00:00</comment_date></row><row _id="row-xhdb_3ghs_r65e" _uuid="00000000-0000-0000-3B8B-BA2E43644974" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xhdb_3ghs_r65e"><intent_id>742495</intent_id><project_id>783075</project_id><text_data>Clean fume hood in 2-E ClinicHazWaste Workers to clean fume hoods using rags, sponges and/or small hand spades</text_data><comment_date>2016-01-20T00:00:00</comment_date></row><row _id="row-a32r_gqw4_ns9t" _uuid="00000000-0000-0000-134B-37E67BE00D32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a32r_gqw4_ns9t"><intent_id>588356</intent_id><project_id>709954</project_id><text_data>Home Owner - Barbara Lee</text_data><comment_date>2013-09-05T00:00:00</comment_date></row><row _id="row-wyen.cjh7_dxm5" _uuid="00000000-0000-0000-BDF2-DDF4A156D486" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wyen.cjh7_dxm5"><intent_id>907624</intent_id><project_id>851965</project_id><text_data>PTI SO 140343</text_data><comment_date>2018-05-30T00:00:00</comment_date></row><row _id="row-cepe.bwu4.i3cg" _uuid="00000000-0000-0000-E8B6-7FE12F34D253" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cepe.bwu4.i3cg"><intent_id>829408</intent_id><project_id>819271</project_id><text_data>Tub Cove&amp;#174;(1) Prime Contractor: Tub Cove Inc.7801 Lake City Way NE Seattle, WA 98115Contractor #TUBCOCI91BKUBI: 602 940 234(2) University of Washington (Hiring entity�not a Contractor)Contact: Graham SherwoodHousing &amp; Food Service/PurchasingP 206-685-9074Job Site Addresses:Laurel Village4200 Mary Gates Way Seattle, WA(3) Work Description: Removing old bath surround; prepping walls in make ready condition to prepare for installation of new Tub Cove laminate surround. Install Tub Cove laminate surround.(4) Type of Structure: Structure is a single family residential apartment.(5) Structure stories or levels: Stories or levels varies. The large percentage of the structures are 4-plex family housing. Some buildings are 2 story duplex housing.(6) Building Use: Buildings are used for student family housing.(7) Answer �yes� or �no�a. No � commercial use in structureb. No � retail use in structurec. No. � Permanent residenced. No � Rehab housee. No � Transitional housingf. No � Communal dining facilityg. No � Treatment servicesh. No � Assisted livingi. No � Dormitoriesj. No � Counselingk. No � separate room/bed rentall. No � other services/usesm. Yes � each unit has its own self-contained kitchenn. Yes � each dwelling unit has its own bathroomo. Yes � here is a community facility or manager�s office on sitep. No - No part of structures are used by members of the general public</text_data><comment_date>2017-04-27T00:00:00</comment_date></row><row _id="row-ewuy-hzub~9v49" _uuid="00000000-0000-0000-17BA-ED17673BE1FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ewuy-hzub~9v49"><intent_id>1501430</intent_id><project_id>1165431</project_id><text_data>&amp;lt;8000gal&amp;gt; 'other truck' may be used for compaction and or dust control.</text_data><comment_date>2025-01-14T00:00:00</comment_date></row><row _id="row-hbv2.z4ks_egnx" _uuid="00000000-0000-0000-FEB1-FEB9610724B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hbv2.z4ks_egnx"><intent_id>1020838</intent_id><project_id>899104</project_id><text_data>1) Replace water heater  2) Single family dwelling 3) 1 level 4a) No 4b) No 4c) Yes 4d) No 4e) No 4f) No 4g) No 4h) No 4i) No 4j) No 4k) No 4l) N/A 5) Yes 6) Yes 7) No 8) No</text_data><comment_date>2019-11-08T00:00:00</comment_date></row><row _id="row-i73v.kjvk.b7ah" _uuid="00000000-0000-0000-15A3-05C68D211093" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i73v.kjvk.b7ah"><intent_id>796971</intent_id><project_id>805315</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2016-10-20T00:00:00</comment_date></row><row _id="row-zakb_e7f5-cum9" _uuid="00000000-0000-0000-71C8-01FDD8D8F058" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zakb_e7f5-cum9"><intent_id>911514</intent_id><project_id>803227</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2018-06-15T00:00:00</comment_date></row><row _id="row-bg9j_69ze.jgqj" _uuid="00000000-0000-0000-4A9A-F89D2286E2CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bg9j_69ze.jgqj"><intent_id>547599</intent_id><project_id>701067</project_id><text_data>replacing intent form #541778 with correct due date and contract award date</text_data><comment_date>2012-12-07T00:00:00</comment_date></row><row _id="row-4fxr_m49m_5e9m" _uuid="00000000-0000-0000-114C-AF4B7292CF27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4fxr_m49m_5e9m"><intent_id>711572</intent_id><project_id>768889</project_id><text_data>Filed by Gerald Ruck</text_data><comment_date>2015-08-03T00:00:00</comment_date></row><row _id="row-prgz.ya6y~gisq" _uuid="00000000-0000-0000-F41F-C202D7D36CFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prgz.ya6y~gisq"><intent_id>766141</intent_id><project_id>793618</project_id><text_data>Repair previously installed LANS and voice/telephone cable. Inside work only.</text_data><comment_date>2016-06-03T00:00:00</comment_date></row><row _id="row-zdr5~gvwd.7pqk" _uuid="00000000-0000-0000-BCEC-37352ED36A63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdr5~gvwd.7pqk"><intent_id>1086224</intent_id><project_id>899085</project_id><text_data>I am unaware of the details about the 'entire project'  we were hired to install lawns by spraying seed/fertilizer/mulch on  exposed soil.  You'll need to reach out to the prime if you need that information.  We were on the job for about 4 hours spraying so sorry we don't know more.  Larry</text_data><comment_date>2020-09-13T00:00:00</comment_date></row><row _id="row-yymz-9psc~592b" _uuid="00000000-0000-0000-0A09-7D30BC29448F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yymz-9psc~592b"><intent_id>528327</intent_id><project_id>690548</project_id><text_data>FOLLOWING NOTES SENT PREVIOUSLY - WHAT MORE IS NEEDED?TRACKHOE TO BE USED FOR MOVING MATERIAL AND PLANTING TREES, ALL OTHER WORK TO BE DONE WITH HAND TOOLS BY HAND.</text_data><comment_date>2012-08-22T00:00:00</comment_date></row><row _id="row-jm5x.b22h_typ2" _uuid="00000000-0000-0000-1904-3A5BF8C01B38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jm5x.b22h_typ2"><intent_id>702056</intent_id><project_id>765370</project_id><text_data>mops, towels, scrub brushes used to hand clean</text_data><comment_date>2015-06-19T00:00:00</comment_date></row><row _id="row-g24k.9iyn~hk6s" _uuid="00000000-0000-0000-CE81-E28455D3D90F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g24k.9iyn~hk6s"><intent_id>1133064</intent_id><project_id>956653</project_id><text_data>38395-1 / Cavelero Mid-High / 8220 24th St SE, Lake Stevens, WA 9825838396-1 / Glennwood Elem / 2221 103rd Ave SE, Lake Stevens, WA 9825838397-1 / Glennwood Portables38398-1 / Highland Elem / 3220 113th Ave NE, Lake Stevens, WA 9825838399-1 / Hillcrest Elem / 9315 4th St SE, Lake Stevens, WA 9825838400-1 / Lake Stevens Middle School / 1031 91st Ave SE, Lake Stevens, WA 9825838401-1 / LS MS Gym &amp; Lower Portables38402-1 / LS MS Bldgs 200 &amp; 300 38403-1 / Mt. Pilchuck Elem / 12806 20th St NE, Lake Stevens, WA 9825838404-1 / Sunnycrest Elem / 3411 99th Ave NE, Lake Stevens, WA 9825838405-1 / Skyline Elem / 1033 91st Ave SE, Lake Stevens, WA 9825838406-1 / North Lake Middle School / 2202 123rd Ave NE, Lake Stevens, WA 9825838407-1 / North Lake MS Bldgs 200/400 &amp; Gym38408-1 / North Lake MS Portables</text_data><comment_date>2021-04-01T00:00:00</comment_date></row><row _id="row-dkiq-c7wk_np2c" _uuid="00000000-0000-0000-A207-AF3FF2328C35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dkiq-c7wk_np2c"><intent_id>1084978</intent_id><project_id>931237</project_id><text_data>Inspect, Suppy, Repair, Install 60 mil HDPE smooth liner, welding rod, Pipe Boot Kit</text_data><comment_date>2020-09-01T00:00:00</comment_date></row><row _id="row-pxy5.sqmk.7i3w" _uuid="00000000-0000-0000-D147-BB5536DCDB0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pxy5.sqmk.7i3w"><intent_id>545728</intent_id><project_id>700202</project_id><text_data>Form filed by: George L Darby</text_data><comment_date>2012-11-26T00:00:00</comment_date></row><row _id="row-jt9y~m9ky.5z26" _uuid="00000000-0000-0000-9728-28E1EAA4DE59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jt9y~m9ky.5z26"><intent_id>1143387</intent_id><project_id>961695</project_id><text_data>? Server Room:o Provide and install 1 each 1U rack mount fiber optic distribution unit (FODU).o Terminate 12 strands of SM fiber with LC connectors.? Environmental Building:o Provide and install 1 each 4U wall mount rack.o Provide and install 1 each 1U rack mount FODU.o Terminate two sets of 12 strands of SM fiber with LC connectors.? Park Entrance:o Provide and install 1 each 4U wall mount rack.o Provide and install 1 each 1U rack mount FODU.o Terminate two sets of 12 strands of SM fiber with LC connectors.</text_data><comment_date>2021-05-10T00:00:00</comment_date></row><row _id="row-tn62.93z5~5a94" _uuid="00000000-0000-0000-01E2-0EC01A20DF2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tn62.93z5~5a94"><intent_id>778452</intent_id><project_id>798326</project_id><text_data>Original Contract Number: 2014-043A</text_data><comment_date>2016-07-28T00:00:00</comment_date></row><row _id="row-wbrx~5mk9_y5tv" _uuid="00000000-0000-0000-A81A-81CC5D8D48CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wbrx~5mk9_y5tv"><intent_id>1134482</intent_id><project_id>957430</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2021-04-12T00:00:00</comment_date></row><row _id="row-k5gg.i97i-wti8" _uuid="00000000-0000-0000-DA9C-A2113D4450DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k5gg.i97i-wti8"><intent_id>978528</intent_id><project_id>881429</project_id><text_data>46974</text_data><comment_date>2019-05-16T00:00:00</comment_date></row><row _id="row-i3sm~79se_thqw" _uuid="00000000-0000-0000-410F-8FFCFFBF962F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i3sm~79se_thqw"><intent_id>1117182</intent_id><project_id>940683</project_id><text_data>L550 Vactor Truck</text_data><comment_date>2021-02-01T00:00:00</comment_date></row><row _id="row-wa4d~7i9r~v85t" _uuid="00000000-0000-0000-DD39-4DEB1E8733DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wa4d~7i9r~v85t"><intent_id>993860</intent_id><project_id>887999</project_id><text_data>BASED ON HUD MAINTENANCE WAGE RATE DETERMINATION DATED 3-28-2018 WITH AN EFFECTIVE DATE OF JULY 1, 2017</text_data><comment_date>2019-07-23T00:00:00</comment_date></row><row _id="row-adf4~3xjz_nset" _uuid="00000000-0000-0000-21D6-6A1D3DEBF9E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-adf4~3xjz_nset"><intent_id>1193475</intent_id><project_id>988116</project_id><text_data>WRS Job #P21-564PW7</text_data><comment_date>2021-11-16T00:00:00</comment_date></row><row _id="row-aajh.b3kz_e52g" _uuid="00000000-0000-0000-2D29-3C525F118D85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aajh.b3kz_e52g"><intent_id>1216075</intent_id><project_id>994592</project_id><text_data>i have completed the training course.</text_data><comment_date>2022-03-30T00:00:00</comment_date></row><row _id="row-ge27-eydb.ugux" _uuid="00000000-0000-0000-AD31-07407B3E35EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ge27-eydb.ugux"><intent_id>839452</intent_id><project_id>823954</project_id><text_data>OTHER =  WATER TRUCK</text_data><comment_date>2017-06-09T00:00:00</comment_date></row><row _id="row-nu5w_sp82-rxan" _uuid="00000000-0000-0000-7E8A-1C7DD2AEB234" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nu5w_sp82-rxan"><intent_id>1132164</intent_id><project_id>956116</project_id><text_data>1521071</text_data><comment_date>2021-03-29T00:00:00</comment_date></row><row _id="row-p4ut_ujap-bdkb" _uuid="00000000-0000-0000-AE24-5C185D747BA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4ut_ujap-bdkb"><intent_id>704436</intent_id><project_id>764513</project_id><text_data>Truck is a 3000 gallon truck mounted hydroseeder</text_data><comment_date>2015-06-30T00:00:00</comment_date></row><row _id="row-b9dr~72hj.puuu" _uuid="00000000-0000-0000-62A6-D08EBC2F8E11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9dr~72hj.puuu"><intent_id>1509198</intent_id><project_id>1170222</project_id><text_data>126236-001</text_data><comment_date>2025-02-12T00:00:00</comment_date></row><row _id="row-s9kj~4s2n.dg54" _uuid="00000000-0000-0000-6F89-278FE0CACF6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s9kj~4s2n.dg54"><intent_id>712037</intent_id><project_id>769054</project_id><text_data>The Telecommunication Technician will pull computer data/internet cable from IDF to Station Ends inside the building.</text_data><comment_date>2015-08-04T00:00:00</comment_date></row><row _id="row-4jc4.uxc6~4pes" _uuid="00000000-0000-0000-B9CF-F8B52947495B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4jc4.uxc6~4pes"><intent_id>670111</intent_id><project_id>723820</project_id><text_data>Kenworth w900 pulling tank trailer with jet grout spoils</text_data><comment_date>2014-12-17T00:00:00</comment_date></row><row _id="row-fgpc-n4c6_pexb" _uuid="00000000-0000-0000-279D-B50A67C799F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fgpc-n4c6_pexb"><intent_id>651707</intent_id><project_id>743286</project_id><text_data>Job # 208833</text_data><comment_date>2014-09-01T00:00:00</comment_date></row><row _id="row-q7ny~gic5~47ij" _uuid="00000000-0000-0000-E90B-FA7466CAC643" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q7ny~gic5~47ij"><intent_id>1091854</intent_id><project_id>895659</project_id><text_data>This is a Housing Act of 1937 project pere 24 CFR 965-101 and is exempt from state prevailing wage rates but not exempt from the application of other prevailing wage requirements under the Washington State Laws, rules and policies.</text_data><comment_date>2020-09-29T00:00:00</comment_date></row><row _id="row-2mtu_v9ds_g9jr" _uuid="00000000-0000-0000-71DD-33B2A775C615" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2mtu_v9ds_g9jr"><intent_id>1290997</intent_id><project_id>1023778</project_id><text_data>Our worker's Comp. Insurance is with Idaho State Fund acct #557688</text_data><comment_date>2022-12-19T00:00:00</comment_date></row><row _id="row-9hqb~n6m6.gpk5" _uuid="00000000-0000-0000-86C9-B19B6CD042BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9hqb~n6m6.gpk5"><intent_id>577048</intent_id><project_id>713970</project_id><text_data>Filed by: Jon Peters</text_data><comment_date>2013-06-24T00:00:00</comment_date></row><row _id="row-5ru9~2e6u.qxvt" _uuid="00000000-0000-0000-FB7A-E0986391DBD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ru9~2e6u.qxvt"><intent_id>649389</intent_id><project_id>735702</project_id><text_data>Form filed by: Gene Oswood</text_data><comment_date>2014-08-20T00:00:00</comment_date></row><row _id="row-ii8z-b2tu~933z" _uuid="00000000-0000-0000-0E94-CF9AF7839925" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ii8z-b2tu~933z"><intent_id>1139789</intent_id><project_id>938045</project_id><text_data>H&amp;W $10.78Pension $9.44Training $.70</text_data><comment_date>2021-04-30T00:00:00</comment_date></row><row _id="row-5umv~yw2w.evdv" _uuid="00000000-0000-0000-C863-4E0525F36EC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5umv~yw2w.evdv"><intent_id>580553</intent_id><project_id>711597</project_id><text_data>General Laborer shoveling dirt and general site workOther trucks- semi &amp; lowboy</text_data><comment_date>2013-07-11T00:00:00</comment_date></row><row _id="row-g485_z3rb-d4gh" _uuid="00000000-0000-0000-F16E-C15436C3B08C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g485_z3rb-d4gh"><intent_id>806665</intent_id><project_id>805124</project_id><text_data>Filed by Jasun Brown</text_data><comment_date>2016-12-12T00:00:00</comment_date></row><row _id="row-4ieg_kdre~tviq" _uuid="00000000-0000-0000-C796-412B5A179EFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ieg_kdre~tviq"><intent_id>827553</intent_id><project_id>745512</project_id><text_data>STARTUP COMMISSIONING OF UPS SN:EK502UXX02, LOAD BANK TESTS, CUSTOMER TRAINING, 1YR WARRANTY</text_data><comment_date>2017-04-19T00:00:00</comment_date></row><row _id="row-9vvu.fu2e.a97c" _uuid="00000000-0000-0000-0B9C-354434559EC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9vvu.fu2e.a97c"><intent_id>1221512</intent_id><project_id>978979</project_id><text_data>We will be installing artificial turf primarily using hand tools such as shovels, rakes and plate compactors.</text_data><comment_date>2022-03-29T00:00:00</comment_date></row><row _id="row-e3pe_w78u_htdw" _uuid="00000000-0000-0000-B531-3AE54D3F503D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e3pe_w78u_htdw"><intent_id>1218701</intent_id><project_id>1004200</project_id><text_data>INV # 88424914 SR # 51457186</text_data><comment_date>2022-03-17T00:00:00</comment_date></row><row _id="row-yzkg.28z8.jd87" _uuid="00000000-0000-0000-BD3B-E45392ECA617" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yzkg.28z8.jd87"><intent_id>685337</intent_id><project_id>756408</project_id><text_data>Randy Keele, owner, will be working on the job.</text_data><comment_date>2015-03-24T00:00:00</comment_date></row><row _id="row-j7uu_q9vq~fx7i" _uuid="00000000-0000-0000-F43E-919E273C0447" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j7uu_q9vq~fx7i"><intent_id>619358</intent_id><project_id>727902</project_id><text_data>Form filed by: Yuriy Tsurkanov</text_data><comment_date>2014-03-10T00:00:00</comment_date></row><row _id="row-etqx-uft6-szs6" _uuid="00000000-0000-0000-D8F7-9BF01029F7DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-etqx-uft6-szs6"><intent_id>634170</intent_id><project_id>736719</project_id><text_data>Aerate/topdres/overseed turf areas at Botanical Garden. Equipment: walk-behind aerator/seeder. 1&amp;quot; depth of topsoil placed using small trackhoe. Hours for aeration/seeding classified under 'landscape construction'. Trackhoe hours classified under Power Equipment Operator.</text_data><comment_date>2014-06-10T00:00:00</comment_date></row><row _id="row-qwwe_2n5z~724a" _uuid="00000000-0000-0000-C8AC-D625472E4158" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qwwe_2n5z~724a"><intent_id>538476</intent_id><project_id>695414</project_id><text_data>Owner may perform work as a Glazier on this project.</text_data><comment_date>2012-10-05T00:00:00</comment_date></row><row _id="row-2tsf_479k~kyuy" _uuid="00000000-0000-0000-F15C-5E4E495243B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tsf_479k~kyuy"><intent_id>775646</intent_id><project_id>789362</project_id><text_data>Filed by Sherrie Thomas</text_data><comment_date>2016-07-18T00:00:00</comment_date></row><row _id="row-enqw~ewia~tqya" _uuid="00000000-0000-0000-D2E0-4D5D419A8404" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-enqw~ewia~tqya"><intent_id>780382</intent_id><project_id>799026</project_id><text_data>Wildlands will be planting perennial native grasses on the floodplain.</text_data><comment_date>2016-08-05T00:00:00</comment_date></row><row _id="row-kuy4-kzxr_t62i" _uuid="00000000-0000-0000-9164-0CF3F2251049" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kuy4-kzxr_t62i"><intent_id>1264516</intent_id><project_id>1029873</project_id><text_data>SPM #27098</text_data><comment_date>2022-09-07T00:00:00</comment_date></row><row _id="row-hrn6_84ub_5dva" _uuid="00000000-0000-0000-79D3-BDF7D0E20025" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hrn6_84ub_5dva"><intent_id>827452</intent_id><project_id>788810</project_id><text_data>Provide the beautification to landscaped areas adjacent to the street via a blower/mulch distribution truck.</text_data><comment_date>2017-04-18T00:00:00</comment_date></row><row _id="row-fe5r_d897_2d8e" _uuid="00000000-0000-0000-EDBD-4A453B9192B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fe5r_d897_2d8e"><intent_id>988623</intent_id><project_id>885960</project_id><text_data>Haz Waste workers to clear area of all debris and spilled liquids using shovels/rags/sorbent pads</text_data><comment_date>2019-07-01T00:00:00</comment_date></row><row _id="row-w4uv.i29s-2ewp" _uuid="00000000-0000-0000-E72E-D0940BE2CAE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w4uv.i29s-2ewp"><intent_id>879395</intent_id><project_id>839510</project_id><text_data>3 year Eaton UPS Service Contract for SN BD441KXX05. (FL87NXX) Flex: 8 Hr Rsp, 7x24 Cvg, extended  warranty, and (0005NXXX) Annual UPS and (0005NS) Battery Preventative Maintenance.</text_data><comment_date>2017-12-14T00:00:00</comment_date></row><row _id="row-dx26-6qdz-ejnu" _uuid="00000000-0000-0000-B1D8-84B0ABA608FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dx26-6qdz-ejnu"><intent_id>529214</intent_id><project_id>692238</project_id><text_data>Semi-tractor/trailer.  Trailer is a 60 CY end dump.</text_data><comment_date>2012-08-17T00:00:00</comment_date></row><row _id="row-4gzx~mdgq.745e" _uuid="00000000-0000-0000-D3A2-7F31F330C8B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4gzx~mdgq.745e"><intent_id>657776</intent_id><project_id>718128</project_id><text_data>Form filed by: Patrick AmesProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2014-09-30T00:00:00</comment_date></row><row _id="row-agq9_nqcp~sbzj" _uuid="00000000-0000-0000-0C0A-10591830D26C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-agq9_nqcp~sbzj"><intent_id>815531</intent_id><project_id>813264</project_id><text_data>Truck is a T800 Kenworth and operator will be using the pump system on the truck to hook up to jacking machine unit. General Laborers will be stacking crib and setting jacks for lifting the collapsed beam back up.</text_data><comment_date>2017-02-13T00:00:00</comment_date></row><row _id="row-uh73-ii4g-e78k" _uuid="00000000-0000-0000-22DB-49059F1D6639" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uh73-ii4g-e78k"><intent_id>791675</intent_id><project_id>802556</project_id><text_data>316691</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-7igi_btws.ebzt" _uuid="00000000-0000-0000-D96A-0A71801F4F4E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7igi_btws.ebzt"><intent_id>529510</intent_id><project_id>249060</project_id><text_data>No awarding agency contact or phone number available.  Kelly SchlahtAccounting AssistantBrightwater Conveyance System Central ContractVinci / Parsons  / Frontier-Kemper JV kschlaht@vpfk.comofc:  425.286.1600</text_data><comment_date>2012-08-27T00:00:00</comment_date></row><row _id="row-skux.cfbg_4cim" _uuid="00000000-0000-0000-307E-DF777A12831F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-skux.cfbg_4cim"><intent_id>1036220</intent_id><project_id>907149</project_id><text_data>#20760, Vogt, Louis, 1903 E Central, Spokane</text_data><comment_date>2020-02-25T00:00:00</comment_date></row><row _id="row-8rv4-uwua-ga4q" _uuid="00000000-0000-0000-5C38-525BED2CB336" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8rv4-uwua-ga4q"><intent_id>1084067</intent_id><project_id>930419</project_id><text_data>***SELF-INSURED***GENERAL LABORER: Performs work of shoveling with a hand shovel, cleaning/sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket and hand broom.OTHER TRUCKS: A Low Boy trailer used for delivery and pick up of equipment. A 2018 Kenworth tack truck 2,000 gallon. A 1995 Mack Water Truck 3,750 gallon.</text_data><comment_date>2020-08-28T00:00:00</comment_date></row><row _id="row-am6x_pdkj~d2bj" _uuid="00000000-0000-0000-7BDF-014009BD1A7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-am6x_pdkj~d2bj"><intent_id>1001573</intent_id><project_id>891024</project_id><text_data>NE Redmond Rd., Redmond, WA 980531. Air seal, attic blow  2. Single family      3. 1      4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No     5. Yes      6. Yes      7. No      8. No</text_data><comment_date>2019-08-21T00:00:00</comment_date></row><row _id="row-tk6j-5k7r-7qte" _uuid="00000000-0000-0000-9050-0079EF070D4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tk6j-5k7r-7qte"><intent_id>1052335</intent_id><project_id>913281</project_id><text_data>NW PENSION 9.00 LOCAL APPR 1.10 HEALTH CARE / VEB 12.77 ORG TRUST 1.00 IND FUND 0.65 NATL PENSION 4.24 ITI/NEMI/SMOHI 0.17 NW SUPPLEMENTAL 0.79 CLEAN CARD 0.07   TOTAL 29.79</text_data><comment_date>2020-04-17T00:00:00</comment_date></row><row _id="row-w69b~j62x-4439" _uuid="00000000-0000-0000-4D96-BE0B12941A25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w69b~j62x-4439"><intent_id>929995</intent_id><project_id>860337</project_id><text_data>WO5061</text_data><comment_date>2018-08-31T00:00:00</comment_date></row><row _id="row-pi25.nvnf-368i" _uuid="00000000-0000-0000-35DA-6E4BBBA22A74" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pi25.nvnf-368i"><intent_id>1173046</intent_id><project_id>968139</project_id><text_data>Deck CoatingsApartment3A. no  B. no  C. Yes  D. not sure  E. not sure  F. not sure  G. not sure  H. not sure I. Not sure  J. not sure  K. not sure L. not surenot surenot surenot surenot sure</text_data><comment_date>2021-08-27T00:00:00</comment_date></row><row _id="row-fnas_vush~q74v" _uuid="00000000-0000-0000-CDDB-85985D1A019B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fnas_vush~q74v"><intent_id>769261</intent_id><project_id>794837</project_id><text_data>Job # 107521-001</text_data><comment_date>2016-06-20T00:00:00</comment_date></row><row _id="row-zupm~3x6c~qj33" _uuid="00000000-0000-0000-A628-D50D359DB1A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zupm~3x6c~qj33"><intent_id>794892</intent_id><project_id>788810</project_id><text_data>Filed by Dale Takamine</text_data><comment_date>2016-10-10T00:00:00</comment_date></row><row _id="row-dtus~fpwu-cf5m" _uuid="00000000-0000-0000-7E7B-F456B755CECE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dtus~fpwu-cf5m"><intent_id>657446</intent_id><project_id>741463</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2014-09-29T00:00:00</comment_date></row><row _id="row-kgg5-jtqc.kcjc" _uuid="00000000-0000-0000-E3F1-120BCD9C5ED8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kgg5-jtqc.kcjc"><intent_id>1028271</intent_id><project_id>902730</project_id><text_data>7022209</text_data><comment_date>2019-12-20T00:00:00</comment_date></row><row _id="row-xqu6.yd9k-kvzs" _uuid="00000000-0000-0000-7382-2861D285A622" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xqu6.yd9k-kvzs"><intent_id>1036449</intent_id><project_id>907301</project_id><text_data>#1 � The crew will be installing a heat pump and replacing the panel#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2020-02-05T00:00:00</comment_date></row><row _id="row-yzc3.vrjn-2e64" _uuid="00000000-0000-0000-7ED6-53A78E761361" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yzc3.vrjn-2e64"><intent_id>811956</intent_id><project_id>811616</project_id><text_data>This note applies to all KCR job numbers listed on the intent.#1 - Residential construction on a house. #2 - Single family dwelling. #3 - 1 story. #4 - Rehabilitation house? No. Transitional housing? No. Communal dining facility? No. Treatment services? No. Dormitories? No. Counseling? No. Is each room and/or bed in the structure rented separately? No. Other? No. #5 - Yes. #6 - Yes. #7 - No. #8 - No.</text_data><comment_date>2017-01-19T00:00:00</comment_date></row><row _id="row-efn4-2kyt~36sm" _uuid="00000000-0000-0000-0B4A-2D450F938CDE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efn4-2kyt~36sm"><intent_id>1339235</intent_id><project_id>1059820</project_id><text_data>Annuity 8.85, Health &amp; Welfare 9.34, HRA .71, Pension 11.00, Vacation/PTO 2.40, Apprenticeship .77, Impact .33, Industry .01</text_data><comment_date>2023-06-23T00:00:00</comment_date></row><row _id="row-zqgb_45p2_sgyn" _uuid="00000000-0000-0000-6723-6EA26524546E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zqgb_45p2_sgyn"><intent_id>1004271</intent_id><project_id>878729</project_id><text_data>Semi Truck - deliver girders</text_data><comment_date>2019-09-03T00:00:00</comment_date></row><row _id="row-8x7x.atu2.te7w" _uuid="00000000-0000-0000-35EE-E945597765B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8x7x.atu2.te7w"><intent_id>851665</intent_id><project_id>828780</project_id><text_data>***Will utilize Idaho employees and they are covered under Idaho Worker&amp;#39;s Comp</text_data><comment_date>2017-08-01T00:00:00</comment_date></row><row _id="row-ymm5_drjd_4dba" _uuid="00000000-0000-0000-7F58-4D8BA8ECBD6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ymm5_drjd_4dba"><intent_id>625683</intent_id><project_id>731705</project_id><text_data>*West Coast Mfg is a fabrication shop only and does not require a contractor's license.**All work is performed off-site in shop at 1515 75th St SW, Everett 98203</text_data><comment_date>2014-04-19T00:00:00</comment_date></row><row _id="row-8kuf_qe9c~ixkr" _uuid="00000000-0000-0000-BC13-7F3E3761BB50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8kuf_qe9c~ixkr"><intent_id>977845</intent_id><project_id>881126</project_id><text_data>Elect tech(06)Inside workLAN(Local Area Network)Low Voltageprovide and install cat6 cabling for access control</text_data><comment_date>2019-05-14T00:00:00</comment_date></row><row _id="row-5uu6.3eif-xxhi" _uuid="00000000-0000-0000-60EA-0086F84EFF62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5uu6.3eif-xxhi"><intent_id>954017</intent_id><project_id>866198</project_id><text_data>Side Dumps</text_data><comment_date>2019-01-08T00:00:00</comment_date></row><row _id="row-sdp5-uacy_ypzy" _uuid="00000000-0000-0000-2114-B53B63827698" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sdp5-uacy_ypzy"><intent_id>958708</intent_id><project_id>872212</project_id><text_data>Tricia Ryland, 303 9th St Vader, WA  98593Grant Grim, 4505 36th Ct SE #36, Lacey WA  98503</text_data><comment_date>2019-02-08T00:00:00</comment_date></row><row _id="row-c32d-w6sy.9ty2" _uuid="00000000-0000-0000-2596-F7F688367D43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c32d-w6sy.9ty2"><intent_id>1290048</intent_id><project_id>1044871</project_id><text_data>SR53503814</text_data><comment_date>2022-12-15T00:00:00</comment_date></row><row _id="row-9x77-pxfp.7uqp" _uuid="00000000-0000-0000-7149-1E84A464A338" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9x77-pxfp.7uqp"><intent_id>838082</intent_id><project_id>823403</project_id><text_data>Fire Test and Inspect Contract</text_data><comment_date>2017-06-05T00:00:00</comment_date></row><row _id="row-25p5-grcz_u8xs" _uuid="00000000-0000-0000-14A5-A01505189772" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-25p5-grcz_u8xs"><intent_id>1180997</intent_id><project_id>980274</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Replace bath fan#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? YES, SINLE FAMILY RESDIDENCE#3 - Including any basement or garage, how many stories or levels does the structure have? 2#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(I) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO(l) Other? NONE#5 - Does each dwelling unit have its own self-contained kitchen? NO#6 - Does each dwelling unit have its own bathroom? NO#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2021-09-27T00:00:00</comment_date></row><row _id="row-h9uk.49zv-uar4" _uuid="00000000-0000-0000-6053-F7DD435435A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h9uk.49zv-uar4"><intent_id>696546</intent_id><project_id>762196</project_id><text_data>#1 - We wired up a mini-split system heat pump. #2 - The structure is a single family dwelling. #3 - Including any basement or garage, the dwelling has 1 story. #4 - No commercial use in the structure. No retail use in the structure. It is a permanent residence only. It is not a rehabilitation house. t is not transitional housing. It is not a communal dining facility. It is not a treatment services center. It is not a dormitory. It is not a counseling center. The rooms and/or beds in the structure are not rented separately. There are no other uses for the structure. #5 - The dwelling unit does have its own self-contained kitchen. #6 - The dwelling unit does have its own bathroom.  #7 - There is no a community facility or manager�s office on site. #8 - No part of the structure is used by the public.</text_data><comment_date>2015-05-26T00:00:00</comment_date></row><row _id="row-utan.kegm.328s" _uuid="00000000-0000-0000-F793-C78BCCEB7DD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utan.kegm.328s"><intent_id>667697</intent_id><project_id>749725</project_id><text_data>The entire project is to cut 2 trees down to ground level, and haul to the dump. The owner will be using a boom lift and a chain saw to cut the tree into pieces and lower them to the ground with a rope, and one laborer will be putting the pieces into the truck.</text_data><comment_date>2014-11-28T00:00:00</comment_date></row><row _id="row-hu8j_89b6_xe88" _uuid="00000000-0000-0000-9947-E5D531B67BA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hu8j_89b6_xe88"><intent_id>569759</intent_id><project_id>709470</project_id><text_data>Filed by Shannon SwickProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2013-05-15T00:00:00</comment_date></row><row _id="row-mytq.3uc9.euy2" _uuid="00000000-0000-0000-2BCC-9EB73FA42B64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mytq.3uc9.euy2"><intent_id>895431</intent_id><project_id>846234</project_id><text_data>Job #114834-001SCOPE OF WORK:  Provide 2 new duplex receptacles.  Provide circuit for new VAV.  Provide 2 new CAT 6 data outlets. All work done inside.</text_data><comment_date>2018-03-28T00:00:00</comment_date></row><row _id="row-w3m4~ia46_pabd" _uuid="00000000-0000-0000-E05F-474B89544113" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w3m4~ia46_pabd"><intent_id>1161346</intent_id><project_id>968235</project_id><text_data>? Assist the District and the Service Providers with relocating the existing Demarc in Portable-A MDF to the new IDF-137? Terminate the 12 strand Singlemode fiber cable that was installed between the MDF and the Family Center IDF in Phase 1.? [01] 12 strand Singlemode Fiber Cable, [01] 1� innerduct and [01] 12pr copper backbone cable from the existing MDF-106 to the new IDF-137 through provided conduit pathway? [01] 2-strand Singlemode fiber cable from IDF-137 to [02] Site CCTV Camera locations? [02] L-Com Pole Mount Enclosures? [423] Cat6 cables installed between the MDF/IDF and [264] workstation locations. Number of cables to each location as shown on bid set drawings.? Locations include: Tele/Data, IC Clock, AV2 and CCTV? [32] Cat6A cables installed between the MDF/IDF and [32] Wireless Access Point locations. [01] Cable to each location.? [02] 2-post Telecom racks? Vertical and Horizontal wire managers as specified? 18� Ladder Tray within IDF-137? Bonding of Racks and Ladder tray to provided TMGB? [01] Fiber LIU with connector bulkheads? Cat6 and Cat6A Patch Panels as specified</text_data><comment_date>2021-07-19T00:00:00</comment_date></row><row _id="row-yksc.tn9f.x9pr" _uuid="00000000-0000-0000-5F7A-32C16AF88FBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yksc.tn9f.x9pr"><intent_id>740627</intent_id><project_id>782230</project_id><text_data>Landscape renovations to various existing planter islands.  Remove and dispose of plant material. Add topsoil at 2&amp;quot; depth using 45hp walk-behind dingo with loader attachment to prepare for new plantings.</text_data><comment_date>2016-01-07T00:00:00</comment_date></row><row _id="row-pe5z~fxs5-spu4" _uuid="00000000-0000-0000-42F5-C557AD9C8E7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pe5z~fxs5-spu4"><intent_id>594783</intent_id><project_id>711571</project_id><text_data>Hired by Westmark Construction Inc</text_data><comment_date>2013-09-19T00:00:00</comment_date></row><row _id="row-n3zs.zp8h~prqq" _uuid="00000000-0000-0000-A62D-55F8120DFE6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n3zs.zp8h~prqq"><intent_id>691052</intent_id><project_id>760788</project_id><text_data>OLYMPIC REGION.</text_data><comment_date>2015-04-27T00:00:00</comment_date></row><row _id="row-qcxe-w597-qwq9" _uuid="00000000-0000-0000-1C2F-7D578A4E5BE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qcxe-w597-qwq9"><intent_id>622499</intent_id><project_id>729641</project_id><text_data>All work preformed by owner</text_data><comment_date>2014-04-01T00:00:00</comment_date></row><row _id="row-rbb5.xgkn_yvwp" _uuid="00000000-0000-0000-12EB-7F8E195A5AAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rbb5.xgkn_yvwp"><intent_id>989040</intent_id><project_id>886121</project_id><text_data>We will reconfigure &amp; install new Irrigation at site.</text_data><comment_date>2019-07-02T00:00:00</comment_date></row><row _id="row-vanc_cb9q.h46p" _uuid="00000000-0000-0000-E811-683F540116AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vanc_cb9q.h46p"><intent_id>502047</intent_id><project_id>683414</project_id><text_data>It appears your company may not be properly calculating worker fringe benefits. By separate email we have sent you a document that explains the benefits calculation process acceptable to the department. Please review that document and adjust your procedures as necessary. Approval of this form does not constitute approval of the methodology your company is using in determining the amount of such contributions. We reserve the right to investigate further the issue on this and future forms that your company submits on which the benefits calculation appears erroneous. If you have questions, please contact Marcus Ehrlander at (360) 902-5334 or marcus.ehrlander@Lni.wa.gov.</text_data><comment_date>2012-10-16T00:00:00</comment_date></row><row _id="row-3n97.e5uw~5xcz" _uuid="00000000-0000-0000-7B0D-ED6EC297470F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3n97.e5uw~5xcz"><intent_id>754428</intent_id><project_id>788618</project_id><text_data>Prune the trees running through the main road of the town. 40-50 trees. Using a Chainsaw, hand saw, and a brush chipper.</text_data><comment_date>2016-04-01T00:00:00</comment_date></row><row _id="row-m26i~kwg7.635w" _uuid="00000000-0000-0000-F6D9-75A513598D01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m26i~kwg7.635w"><intent_id>1098410</intent_id><project_id>783637</project_id><text_data>All terminations and testing to be done by Electronic Technician.</text_data><comment_date>2020-10-23T00:00:00</comment_date></row><row _id="row-pqdu~6ykt-97h7" _uuid="00000000-0000-0000-F614-13B0B3B04E8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqdu~6ykt-97h7"><intent_id>492538</intent_id><project_id>679538</project_id><text_data>Intent to cover multible jobs per agreement with Bea Hart.</text_data><comment_date>2011-12-08T00:00:00</comment_date></row><row _id="row-gcwz.uaa2_cuui" _uuid="00000000-0000-0000-0346-C030E4948151" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcwz.uaa2_cuui"><intent_id>654292</intent_id><project_id>742045</project_id><text_data>Delores Tucker, 1200 Lincoln St #4121.)Repair leak on main water line 2.)yes, 3.)1 4.)a.no, b.no, c.yes, d.no, e.no, f.no, g.no, h.no, i.no, j.no, k.no 5.)yes, 6.)yes, 7.) yes, managers office, 8.no</text_data><comment_date>2014-09-12T00:00:00</comment_date></row><row _id="row-kvka~z9wa_cq75" _uuid="00000000-0000-0000-6775-5080D5CE4031" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvka~z9wa_cq75"><intent_id>943984</intent_id><project_id>865759</project_id><text_data>Owner of company will perform all work on this project</text_data><comment_date>2018-11-05T00:00:00</comment_date></row><row _id="row-2b58_9wie_y6ga" _uuid="00000000-0000-0000-E3A5-19ED12EF02C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2b58_9wie_y6ga"><intent_id>680878</intent_id><project_id>756415</project_id><text_data>General Laborer: performs work of shoveling with a hand shovel, cleaning-sweeping with a hand broom, heating joints with a flamo, tacking using a tack bucket.Other Trucks: A Low boy trailer for delivery and pick up of equipment.</text_data><comment_date>2015-02-25T00:00:00</comment_date></row><row _id="row-bb4i~pxb5-a886" _uuid="00000000-0000-0000-A7C7-8749C612ACCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bb4i~pxb5-a886"><intent_id>1140905</intent_id><project_id>960330</project_id><text_data>SERVICE JOB 30003337</text_data><comment_date>2021-04-29T00:00:00</comment_date></row><row _id="row-47ye-zzk2.j44d" _uuid="00000000-0000-0000-0D5A-0D4EFD11E755" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-47ye-zzk2.j44d"><intent_id>501435</intent_id><project_id>675692</project_id><text_data>Form filed by: Hector Ceniver</text_data><comment_date>2012-02-23T00:00:00</comment_date></row><row _id="row-cfms_mw9t-8k39" _uuid="00000000-0000-0000-6F9F-9F0609AD5247" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cfms_mw9t-8k39"><intent_id>761668</intent_id><project_id>786951</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2016-05-12T00:00:00</comment_date></row><row _id="row-h6r2~wrud.5hy8" _uuid="00000000-0000-0000-2DD4-CA3A709E7089" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h6r2~wrud.5hy8"><intent_id>1211342</intent_id><project_id>999454</project_id><text_data>low income weatherization</text_data><comment_date>2022-02-14T00:00:00</comment_date></row><row _id="row-p2bk-x9wz~87bd" _uuid="00000000-0000-0000-B83F-5D3B3DB4CD37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p2bk-x9wz~87bd"><intent_id>967285</intent_id><project_id>875124</project_id><text_data>We were waiting on INSI to provide us with their Intent Number in order to file our Intent.We were directed to get under way with the work prior to getting the Intent Number from them, due to our portion of the project needing to be completed before impacting other scheduled work.</text_data><comment_date>2019-03-25T00:00:00</comment_date></row><row _id="row-b8m5_37zb-fwfp" _uuid="00000000-0000-0000-BCFE-3F8BFE02605C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b8m5_37zb-fwfp"><intent_id>743913</intent_id><project_id>783780</project_id><text_data>This is an annual contract.  City of Seattle requires an Intent to be filed.  There will be numerous jobs included on this and Affidavits will be filed for each one.</text_data><comment_date>2016-01-28T00:00:00</comment_date></row><row _id="row-waws~vpmi.u3gd" _uuid="00000000-0000-0000-96F7-21164880E893" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-waws~vpmi.u3gd"><intent_id>1255182</intent_id><project_id>1025120</project_id><text_data>sr52117448</text_data><comment_date>2022-08-04T00:00:00</comment_date></row><row _id="row-7krk~mbqw-ssna" _uuid="00000000-0000-0000-9CE0-77B1CB2B8ACD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7krk~mbqw-ssna"><intent_id>311850</intent_id><project_id>607811</project_id><text_data>Be advised that in 2010 we revised our processing method for on-call/blanket/annual maintenance and repair contracts to require the contractor and each subcontractor file an Intent for their first work under the contract (for instance the first call-out for the subcontractor).  For this Intent filing firms are to enter �Time and Materials� for  the dollar amount of the contract as an exact dollar amount cannot be identified at the time of filing. To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  When filing these forms, the dollar amount of the contract (which is the total amount that will be invoiced), including tax, will be entered on the form along with a short explanation in the notes section about the nature of the work so that the project can be tracked by the awarding agency and L&amp;I. In addition, if acting as the prime contractor, firms must ensure that all subcontractors follow the outlined procedures.  Please note that an on-call/blanket/annual contract may not be utilized for construction projects or for warranty work as these require their own set of Intent and Affidavit forms with the appropriate bid and award dates associated with those specific contracts.  The use of on-call/blanket/annual contracts is limited to minor maintenance and repair work.  If a firm has no written contract with the a public agency outlining the maintenance and repair to be performed and a term date for the contract, this filing information does not apply and these firms must file an Intent and an Affidavit each time they are called out to perform work.On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the contract and multiple Affidavits for each project�s work order/task order/call out.  This form filing requirement also applies to owner/operators.  Please follow this filing method on any future contracts covered under this policy.  (RCW 39.12.040)We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies, such as this one, through our electronic mailing list.  If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.  A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp(chrr235)</text_data><comment_date>2012-03-14T00:00:00</comment_date></row><row _id="row-tiq6-mdgr_2gy5" _uuid="00000000-0000-0000-BEC7-2E6AF5861F0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tiq6-mdgr_2gy5"><intent_id>635579</intent_id><project_id>737293</project_id><text_data>Truck Drivers/Other Trucks - 3,500 gallon water truck</text_data><comment_date>2014-06-18T00:00:00</comment_date></row><row _id="row-5tte.3vnw-v8a9" _uuid="00000000-0000-0000-00A8-A2D62D76A59E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5tte.3vnw-v8a9"><intent_id>680688</intent_id><project_id>751575</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2015-02-24T00:00:00</comment_date></row><row _id="row-rprd.zu72-b2si" _uuid="00000000-0000-0000-B3FB-A1FD8E5A242B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rprd.zu72-b2si"><intent_id>693193</intent_id><project_id>760435</project_id><text_data>General Laborer is the classification we have been using since 1995 as directed by L&amp;I.  The workers shovel cement into the small manual curb machine which is pushed along as it extrudes concrete curbing onto the pavement.  They also clean up using shovels and brooms as needed.  They have nothing to do with the Traffic Control Stripers.</text_data><comment_date>2015-05-07T00:00:00</comment_date></row><row _id="row-mbm8-q2ht~mfgt" _uuid="00000000-0000-0000-7A3B-B991F412A853" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbm8-q2ht~mfgt"><intent_id>1057300</intent_id><project_id>918057</project_id><text_data>Job 208</text_data><comment_date>2020-05-12T00:00:00</comment_date></row><row _id="row-dpfa-d323~i5sy" _uuid="00000000-0000-0000-1318-3B04899767EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpfa-d323~i5sy"><intent_id>1194060</intent_id><project_id>988488</project_id><text_data>9874322</text_data><comment_date>2021-11-18T00:00:00</comment_date></row><row _id="row-25e5-jxan_ymne" _uuid="00000000-0000-0000-DD77-D5E315A8DD2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-25e5-jxan_ymne"><intent_id>1202851</intent_id><project_id>993856</project_id><text_data>Fringes: Pension $28.94, Medical Insurance: $6.32, Vacation: $1.00, Holiday: $1.08</text_data><comment_date>2022-01-25T00:00:00</comment_date></row><row _id="row-kxvb~j2w5_vthy" _uuid="00000000-0000-0000-02F7-49D7E5C6A802" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kxvb~j2w5_vthy"><intent_id>661165</intent_id><project_id>746319</project_id><text_data>This Intent is intended to replace Intent ID #564096</text_data><comment_date>2014-10-20T00:00:00</comment_date></row><row _id="row-43y4.396j_bq62" _uuid="00000000-0000-0000-5E57-DDAA041CBEE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-43y4.396j_bq62"><intent_id>709536</intent_id><project_id>768165</project_id><text_data>Landscape maintenance, mowing, blowing, weeding, mulch and pruning</text_data><comment_date>2015-07-23T00:00:00</comment_date></row><row _id="row-pbze-besv_xvb8" _uuid="00000000-0000-0000-2802-36E9923E0A13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pbze-besv_xvb8"><intent_id>998029</intent_id><project_id>881043</project_id><text_data>WE ONLY DO IN-HOUSE FABRICATION OF CONCRETE PRODUCTS. THEREFORE, NO CONTRACTOR REGISTRATION IS NECESSARY.</text_data><comment_date>2019-08-08T00:00:00</comment_date></row><row _id="row-ebz9-2x2f_2jhc" _uuid="00000000-0000-0000-5A2C-5C51D64C303C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebz9-2x2f_2jhc"><intent_id>578446</intent_id><project_id>707646</project_id><text_data>Filed by: R.T. Vatne</text_data><comment_date>2013-06-28T00:00:00</comment_date></row><row _id="row-u47z_c56b_scgu" _uuid="00000000-0000-0000-A431-BB7F85568CC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u47z_c56b_scgu"><intent_id>1064538</intent_id><project_id>915006</project_id><text_data>Sod Installtion</text_data><comment_date>2020-06-12T00:00:00</comment_date></row><row _id="row-dbfc-vb6j.q42y" _uuid="00000000-0000-0000-2F94-B24AC2BC09FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dbfc-vb6j.q42y"><intent_id>592223</intent_id><project_id>719422</project_id><text_data>$21.79 = Health Plan $8.61, Pension Plan $10.97, Vacation Plan $1.38, Holiday Plan $0.83 per hour.</text_data><comment_date>2014-02-28T00:00:00</comment_date></row><row _id="row-tnyx-kn5j-hft4" _uuid="00000000-0000-0000-D779-99FCCF9FDBA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tnyx-kn5j-hft4"><intent_id>919789</intent_id><project_id>853116</project_id><text_data>LAYFIELD WILL FURNISH AND INSTALL GEOMEMBRANE MATERIALS IN BREMERTON, WA</text_data><comment_date>2018-07-20T00:00:00</comment_date></row><row _id="row-ii27-id43-ium6" _uuid="00000000-0000-0000-8DAE-DDA6094C01EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ii27-id43-ium6"><intent_id>910658</intent_id><project_id>853152</project_id><text_data>INDOOR COMPUTER NETWORK CABLING.</text_data><comment_date>2018-06-25T00:00:00</comment_date></row><row _id="row-ugqx.p6qi-dbne" _uuid="00000000-0000-0000-6784-CED80ED9B0F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ugqx.p6qi-dbne"><intent_id>1233321</intent_id><project_id>1013132</project_id><comment_date>2022-05-13T00:00:00</comment_date></row><row _id="row-79qq.ytch.mnrp" _uuid="00000000-0000-0000-30D1-0895D7F94CD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-79qq.ytch.mnrp"><intent_id>695707</intent_id><project_id>762773</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2015-05-20T00:00:00</comment_date></row><row _id="row-g3mg_3hsh_a489" _uuid="00000000-0000-0000-4809-E742013E51BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g3mg_3hsh_a489"><intent_id>1137811</intent_id><project_id>953314</project_id><text_data>All electrical work will be done in single family residence. None will have commercial use or will have any use other than a single family residence</text_data><comment_date>2021-05-04T00:00:00</comment_date></row><row _id="row-gn58_jr7v.84uh" _uuid="00000000-0000-0000-45D8-0C42E254ADE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gn58_jr7v.84uh"><intent_id>766809</intent_id><project_id>793884</project_id><text_data>1)We were contracted to replace the furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2016-06-07T00:00:00</comment_date></row><row _id="row-kwt9_kvxh.gfe7" _uuid="00000000-0000-0000-4656-01F11F1B9AE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kwt9_kvxh.gfe7"><intent_id>704344</intent_id><project_id>766247</project_id><text_data>The other truck is a water truck</text_data><comment_date>2015-06-30T00:00:00</comment_date></row><row _id="row-pevk_c2ya-fg2r" _uuid="00000000-0000-0000-CE61-A51F0E7055C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pevk_c2ya-fg2r"><intent_id>1128374</intent_id><project_id>954073</project_id><text_data>Completed the required training</text_data><comment_date>2021-04-09T00:00:00</comment_date></row><row _id="row-ve3n.8tvd~iref" _uuid="00000000-0000-0000-9C13-E656558E4333" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ve3n.8tvd~iref"><intent_id>474761</intent_id><project_id>668546</project_id><text_data>Hydroseed lawns</text_data><comment_date>2011-08-26T00:00:00</comment_date></row><row _id="row-7tfn-ciih~4wns" _uuid="00000000-0000-0000-BFF8-CFC19D3D3FA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7tfn-ciih~4wns"><intent_id>1509262</intent_id><project_id>1170269</project_id><text_data>INV # 89781899 SR # 54341132</text_data><comment_date>2025-02-12T00:00:00</comment_date></row><row _id="row-h5c7-7w7f_w7xd" _uuid="00000000-0000-0000-5AC8-6E13A40794DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h5c7-7w7f_w7xd"><intent_id>691414</intent_id><project_id>760591</project_id><text_data>Filed by Cody CreightonProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations: General Laborers and Power Equipment Operators-Drilling Machine.</text_data><comment_date>2015-04-28T00:00:00</comment_date></row><row _id="row-tpuq_x2qv-pjdj" _uuid="00000000-0000-0000-339F-53702B20DC2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tpuq_x2qv-pjdj"><intent_id>546485</intent_id><project_id>700560</project_id><text_data>Replace Backtop FenceEquip: hand tools</text_data><comment_date>2012-11-29T00:00:00</comment_date></row><row _id="row-ctfe-bifr-pxha" _uuid="00000000-0000-0000-4D1B-E36B76320C38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ctfe-bifr-pxha"><intent_id>1291475</intent_id><project_id>1045859</project_id><text_data>9905557 - Invoice 10196217</text_data><comment_date>2022-12-21T00:00:00</comment_date></row><row _id="row-skzx-jej5~znxb" _uuid="00000000-0000-0000-6175-3D171C32C4DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-skzx-jej5~znxb"><intent_id>1110397</intent_id><project_id>898386</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project?5.   Service work Sept 2019 thru Aug 31, 2020       2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?   No   3. Does this project entail the remodeling or new construction of a facility?  No.      4. If your firm is working upon a type of building system, what type of system is involved?  Fire Alarm System.        5. When is your Work to be completed?     During the project     6. What specific tasks did your employees perform?    Siemens� FIS Technicians, perform their work strictly on laptop computers, both remotely and on-site during the commissioning process. While off-site, the FIS Technicians update program configurations and point inputs. The FIS Technician typically sits in at control panel and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the system is operating properly, the FIS Technician trains the end-user about system functionality, again using a computer interface. Importantly, FIS Technicians do not use trade tools, such as drills or wrenches.     7. What, if any, tools did your employees use in the performance of those tasks?     Laptop computer.      8. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks?    No  9. Are you going to be hiring any subcontractors for this project?     No</text_data><comment_date>2020-12-16T00:00:00</comment_date></row><row _id="row-a9kv-w473~85qz" _uuid="00000000-0000-0000-70FA-8F3AEE870783" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a9kv-w473~85qz"><intent_id>700329</intent_id><project_id>763085</project_id><text_data>The duties of the general laborer are: Selective Demolition of interior walls and floors.</text_data><comment_date>2015-06-12T00:00:00</comment_date></row><row _id="row-b8th_n4t2-pa5e" _uuid="00000000-0000-0000-9E15-6E01C177351B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b8th_n4t2-pa5e"><intent_id>809419</intent_id><project_id>810420</project_id><text_data>Second worker on this job is a helper only and not a skilled worker.</text_data><comment_date>2017-01-03T00:00:00</comment_date></row><row _id="row-5tcn.f2cv.zm59" _uuid="00000000-0000-0000-07CF-1DB71F71E67A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5tcn.f2cv.zm59"><intent_id>1038117</intent_id><project_id>902588</project_id><text_data>Filed By Linda Burke</text_data><comment_date>2020-02-13T00:00:00</comment_date></row><row _id="row-bd4q_zxjk~b57b" _uuid="00000000-0000-0000-29CE-83B88066055D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bd4q_zxjk~b57b"><intent_id>524264</intent_id><project_id>692290</project_id><text_data>Joyce Halldorson 122 11th Ave E Seattle, Caroline Harman 9533 3rd Ave NW Seattle, Nina Velikin 1501 Sturgus Ave S. Seattle.</text_data><comment_date>2012-07-31T00:00:00</comment_date></row><row _id="row-b3ba_y9yp_7dzx" _uuid="00000000-0000-0000-F260-13F21691E098" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b3ba_y9yp_7dzx"><intent_id>979911</intent_id><project_id>882014</project_id><text_data>This is Quote #3 of 3</text_data><comment_date>2019-05-23T00:00:00</comment_date></row><row _id="row-4yw9.yusg-2kkm" _uuid="00000000-0000-0000-C29A-E5C5F95C2476" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4yw9.yusg-2kkm"><intent_id>495384</intent_id><project_id>680725</project_id><text_data>These structures are used as permanent single family residences. Each unit has its own kitchen and bathroom. The purpose of this project is to alter, repair, improve or maintain the single family residence that is used solely as a permanent single family residence. Absolutely no work will be or has been performed on a community building or other public area.</text_data><comment_date>2012-01-03T00:00:00</comment_date></row><row _id="row-ijkt.eazc.vifw" _uuid="00000000-0000-0000-7A65-2E65BBB56F46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijkt.eazc.vifw"><intent_id>902490</intent_id><project_id>847147</project_id><text_data>It should be Installation; not insulation.</text_data><comment_date>2018-05-24T00:00:00</comment_date></row><row _id="row-r3z2~q2x9.rejc" _uuid="00000000-0000-0000-9DBC-151DB966DA75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r3z2~q2x9.rejc"><intent_id>1154968</intent_id><project_id>960492</project_id><text_data>Whole Proj: Demo, Removals, Grading, Curb Gutter &amp; Sidewalk, Storm Work, Crushed Rock, Paving, Striping, Concrete and Landscaping.Our Portion:  Beautification of areas adjacent to street through the installation of auto irrigation, soil amendment, topsoil, street trees and seeded grassEquip:  Mini excavator 37hp, backhoe 70 hp ( both under the 90hp threshold), hydroseeder &amp; hand toolsOther Trucks: KW Equip Truck and Trailer, Freightliner box truck, both rear dual axles, both used to haul equipment and materials to jobsite.</text_data><comment_date>2021-06-23T00:00:00</comment_date></row><row _id="row-r7xi_y67e-4axt" _uuid="00000000-0000-0000-DE65-D4F8F7DAED38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r7xi_y67e-4axt"><intent_id>770336</intent_id><project_id>795221</project_id><text_data>Laborers will be installing rodenticide in exterior bait stations and spraying areas for insects as needed only, with hand tanks or b&amp;g one gallon sprayers.</text_data><comment_date>2016-06-30T00:00:00</comment_date></row><row _id="row-72h5.fqsx-njmj" _uuid="00000000-0000-0000-35A7-BFADECCA3A90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-72h5.fqsx-njmj"><intent_id>976454</intent_id><project_id>880514</project_id><text_data>No contract number provided by the customer.</text_data><comment_date>2019-05-08T00:00:00</comment_date></row><row _id="row-vnvk.bagf.mpzm" _uuid="00000000-0000-0000-EA3F-50A41DEA6F8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vnvk.bagf.mpzm"><intent_id>1024525</intent_id><project_id>746319</project_id><text_data>Contract amount is .4*5172693.97(reported by JV)</text_data><comment_date>2019-12-03T00:00:00</comment_date></row><row _id="row-z2qq~4b3p~gyka" _uuid="00000000-0000-0000-E302-B52BF3A17154" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z2qq~4b3p~gyka"><intent_id>925932</intent_id><project_id>844643</project_id><text_data>Fringe Benefits consists of $7.00 Annuity, $10.45 Pension, $8.17 Medical, $1.90 PTO, $0.25 Ironworkers Management Progressive Action Cooperative Trust, $0.70 Apprenticeship fund, $0.01 Industry fund - Total $27.77</text_data><comment_date>2018-08-15T00:00:00</comment_date></row><row _id="row-nugd.sfru_cgwu" _uuid="00000000-0000-0000-C73E-2494C7E594B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nugd.sfru_cgwu"><intent_id>1277934</intent_id><project_id>1037125</project_id><text_data>9900422</text_data><comment_date>2022-10-26T00:00:00</comment_date></row><row _id="row-gzz3_a7h4-fyvm" _uuid="00000000-0000-0000-CBC9-5BAE794CC5CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzz3_a7h4-fyvm"><intent_id>637170</intent_id><project_id>737878</project_id><text_data>Lay fabric and plant willow stakes</text_data><comment_date>2014-06-25T00:00:00</comment_date></row><row _id="row-tqnv-7h8m_kviy" _uuid="00000000-0000-0000-2275-A4E62305E4A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tqnv-7h8m_kviy"><intent_id>1055741</intent_id><project_id>917870</project_id><text_data>The project is to install a cured in place liner into existing sewer lines without digging them up - no excavation.  Michels to perform all work through existing manholes</text_data><comment_date>2020-05-05T00:00:00</comment_date></row><row _id="row-8its-epa5.zwjf" _uuid="00000000-0000-0000-FAAD-D625EA8B4F8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8its-epa5.zwjf"><intent_id>704792</intent_id><project_id>766417</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2019-08-16T00:00:00</comment_date></row><row _id="row-6c73.99ic.hhdw" _uuid="00000000-0000-0000-DA92-B3A726BC8716" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6c73.99ic.hhdw"><intent_id>1509542</intent_id><project_id>1170444</project_id><text_data>Work performed by the Telecommunication Technicians is installing/repairing fiber optic telecommunications cabling for voice (telephone) and/or data (computer networking) indoors. POWERCOM JOB #451765</text_data><comment_date>2025-02-13T00:00:00</comment_date></row><row _id="row-bvu2-2hwc.edjg" _uuid="00000000-0000-0000-3233-04744BA2B372" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bvu2-2hwc.edjg"><intent_id>620446</intent_id><project_id>731004</project_id><text_data>We have examined our fringe rate and confirm it includes only benefits allowable under WAC 296-127-014.  The fringes include only the following:  an employer provided health plan, employer-paid life insurance, actual used vacation (not accrued), holidays, and contributions to the trust associated with an IRS-approved, trustee-managed ERISA pension plan.  Hourly fringe benefits consist of $3.65 Medical, $0.25 Life, $0.75 Vacation, $0.50 Holiday and the remaining to Pension.</text_data><comment_date>2014-03-17T00:00:00</comment_date></row><row _id="row-atwp.7qu4-j3jx" _uuid="00000000-0000-0000-A61F-EA4B8DFAC380" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-atwp.7qu4-j3jx"><intent_id>549609</intent_id><project_id>695545</project_id><text_data>Form filed by: Joel Parsons</text_data><comment_date>2012-12-21T00:00:00</comment_date></row><row _id="row-9c69~cvhs_h2fu" _uuid="00000000-0000-0000-201D-341B1E2D04C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9c69~cvhs_h2fu"><intent_id>1210942</intent_id><project_id>996678</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a thru 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2022-02-11T00:00:00</comment_date></row><row _id="row-fcpd.jsuy_hreh" _uuid="00000000-0000-0000-CADB-B20CFBF77169" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fcpd.jsuy_hreh"><intent_id>1004528</intent_id><project_id>888014</project_id><text_data>Lakeside job# 0419081trucks - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2019-09-04T00:00:00</comment_date></row><row _id="row-cew9~3fv7_4un7" _uuid="00000000-0000-0000-401D-234B7549C7B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cew9~3fv7_4un7"><intent_id>881712</intent_id><project_id>832477</project_id><text_data>We are only placing decorative rock and decorative bark in gardens.</text_data><comment_date>2018-01-11T00:00:00</comment_date></row><row _id="row-fda8-y3z6_huyb" _uuid="00000000-0000-0000-B099-030AC64B7B6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fda8-y3z6_huyb"><intent_id>757213</intent_id><project_id>782505</project_id><text_data>Employees enter into man holes to service equipment inside the man hole that is electronically measuring flow. These employees are certified with confined space training. They use a tripod, general hand tools, gas meter, and velocity meter. They travel in an ADS equipped van.</text_data><comment_date>2016-04-18T00:00:00</comment_date></row><row _id="row-h2a5_xe4d.3zz6" _uuid="00000000-0000-0000-4405-AFE7FF86DAE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2a5_xe4d.3zz6"><intent_id>803979</intent_id><project_id>768728</project_id><text_data>Will be providing the beautification of areas adjacent to the school. We will install compost to existing ground cover via a blower truck.</text_data><comment_date>2016-11-22T00:00:00</comment_date></row><row _id="row-nrcq_9x72~ir9b" _uuid="00000000-0000-0000-F814-D0BC767E58AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrcq_9x72~ir9b"><intent_id>1112612</intent_id><project_id>906018</project_id><text_data>Providing the beautification of a school adjacent to the roadway using a blower/mulch truck to place beauty bark.</text_data><comment_date>2020-12-31T00:00:00</comment_date></row><row _id="row-ggsd.cxq2-4fbc" _uuid="00000000-0000-0000-9986-3251B8769425" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ggsd.cxq2-4fbc"><intent_id>1035236</intent_id><project_id>905425</project_id><text_data>Maint 09-01-19 thru 08-31-20 TAC</text_data><comment_date>2020-01-31T00:00:00</comment_date></row><row _id="row-w2qc_m7xq.c564" _uuid="00000000-0000-0000-41DA-3B8D6150250E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w2qc_m7xq.c564"><intent_id>1091719</intent_id><project_id>925772</project_id><text_data>WRI Job # 20.850/ 45480 &amp; 45481</text_data><comment_date>2020-09-29T00:00:00</comment_date></row><row _id="row-ht6p.sgmi-9xqx" _uuid="00000000-0000-0000-9D9D-3467D4C8056B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ht6p.sgmi-9xqx"><intent_id>1225064</intent_id><project_id>1004245</project_id><text_data>I AM A OWNER OPERATOR AND WILL NOT HAVE ANY BODY WORKING WITH ME</text_data><comment_date>2022-04-12T00:00:00</comment_date></row><row _id="row-bs7g_9gxm.t9g9" _uuid="00000000-0000-0000-1DB5-A8E6549F8900" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bs7g_9gxm.t9g9"><intent_id>891176</intent_id><project_id>819541</project_id><text_data>Rubberized Surfacing and Elayer Install</text_data><comment_date>2018-03-05T00:00:00</comment_date></row><row _id="row-7ny8_vz87_xcmc" _uuid="00000000-0000-0000-9398-536A2A13B7B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ny8_vz87_xcmc"><intent_id>983273</intent_id><project_id>883612</project_id><text_data>This replaces intent #898268 which did not include any Halbert labor.  Subs filed under the old intent number.</text_data><comment_date>2019-06-07T00:00:00</comment_date></row><row _id="row-z35i.8rmd.iiqe" _uuid="00000000-0000-0000-E9B1-C64C37EB619B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z35i.8rmd.iiqe"><intent_id>1290831</intent_id><project_id>1045423</project_id><text_data>Job # 42499-1</text_data><comment_date>2022-12-19T00:00:00</comment_date></row><row _id="row-6iy9_drk7-8c72" _uuid="00000000-0000-0000-7C71-75340BB95AF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6iy9_drk7-8c72"><intent_id>506459</intent_id><project_id>674397</project_id><text_data>1111132</text_data><comment_date>2012-04-04T00:00:00</comment_date></row><row _id="row-qiv3-zhff_3zqy" _uuid="00000000-0000-0000-B37A-4715C2FBF363" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qiv3-zhff_3zqy"><intent_id>553249</intent_id><project_id>697960</project_id><text_data>Job # 1975 Related to C12055</text_data><comment_date>2013-01-23T00:00:00</comment_date></row><row _id="row-m76d~mjn9-697t" _uuid="00000000-0000-0000-0B09-56A077641419" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m76d~mjn9-697t"><intent_id>796722</intent_id><project_id>790404</project_id><text_data>GENERAL LABOR IS HAND WORK ONLY (SHOVEL WORK) NO POWER EQUIPMENT OR POWER TOOLS.</text_data><comment_date>2016-10-19T00:00:00</comment_date></row><row _id="row-sysc_bwab~upp3" _uuid="00000000-0000-0000-C6B0-CA5E3F14F37C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sysc_bwab~upp3"><intent_id>1248461</intent_id><project_id>1018730</project_id><text_data>Granite job# 1153999trucks - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2022-07-12T00:00:00</comment_date></row><row _id="row-x6k4_pxi4.r6bx" _uuid="00000000-0000-0000-C05E-6D3D27781483" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x6k4_pxi4.r6bx"><intent_id>699729</intent_id><project_id>674285</project_id><text_data>Truck Drivers, Other Trucks - Water tankers (6000 gallons and under), used for hauling water to the roto-grinders</text_data><comment_date>2015-06-16T00:00:00</comment_date></row><row _id="row-weje.ujih~saa2" _uuid="00000000-0000-0000-86D9-CC817A777A15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-weje.ujih~saa2"><intent_id>1156217</intent_id><project_id>968562</project_id><text_data>RELOCATE EXISTING VOICE AND DATA CABLING TO FACILITATE RECONFIGURATION OF WORK STATIONS IN WILDCOM.</text_data><comment_date>2021-06-28T00:00:00</comment_date></row><row _id="row-q8dd-xneh-3ksx" _uuid="00000000-0000-0000-E747-58C009DA779C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8dd-xneh-3ksx"><intent_id>1111696</intent_id><project_id>944554</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2020-12-31T00:00:00</comment_date></row><row _id="row-a425-ppy9~iipu" _uuid="00000000-0000-0000-1765-8A93E4DA6326" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a425-ppy9~iipu"><intent_id>589154</intent_id><project_id>718292</project_id><text_data>013071</text_data><comment_date>2013-08-21T00:00:00</comment_date></row><row _id="row-fdc4-mtk3_msgt" _uuid="00000000-0000-0000-8126-23BDFEFE6594" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fdc4-mtk3_msgt"><intent_id>1195106</intent_id><project_id>989132</project_id><text_data>WO#26679 Job#2751</text_data><comment_date>2021-11-23T00:00:00</comment_date></row><row _id="row-nxah~sgam~niq6" _uuid="00000000-0000-0000-5EC7-3DA7434F9086" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nxah~sgam~niq6"><intent_id>721425</intent_id><project_id>772678</project_id><text_data>This is a Vactor Type Pumping Truck</text_data><comment_date>2015-09-17T00:00:00</comment_date></row><row _id="row-neva_in59.4p9x" _uuid="00000000-0000-0000-09EA-D04E70E73BCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-neva_in59.4p9x"><intent_id>775507</intent_id><project_id>797216</project_id><text_data>GENERAL LABOER WILL BE CLEAN UP AND MOVING MATERIALS USING SHOVEL AND RAKE</text_data><comment_date>2016-07-18T00:00:00</comment_date></row><row _id="row-hcic-ejeb.8aq5" _uuid="00000000-0000-0000-7986-A7F7E6580206" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hcic-ejeb.8aq5"><intent_id>527999</intent_id><project_id>693668</project_id><text_data>Filed By: Alyna Truong</text_data><comment_date>2012-08-13T00:00:00</comment_date></row><row _id="row-bq2m~cfsm-em7w" _uuid="00000000-0000-0000-F769-6509A9CAF77B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bq2m~cfsm-em7w"><intent_id>449221</intent_id><project_id>645098</project_id><text_data>I am a marine contractor and only work over water.  We are not able to use a L&amp;I account for our workers.  We have a federal insurance for this.  Please call me if you need more infomation 206-459-1737 Brian</text_data><comment_date>2011-04-21T00:00:00</comment_date></row><row _id="row-3eus~byun.czpj" _uuid="00000000-0000-0000-A0DD-5919ECD84EA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3eus~byun.czpj"><intent_id>1336330</intent_id><project_id>1070255</project_id><text_data>We hired to hook up electrical for drying equipment</text_data><comment_date>2023-06-23T00:00:00</comment_date></row><row _id="row-gktu~m8v4~aapm" _uuid="00000000-0000-0000-3F1C-6102A4E29F48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gktu~m8v4~aapm"><intent_id>654114</intent_id><project_id>744218</project_id><text_data>044223</text_data><comment_date>2014-09-12T00:00:00</comment_date></row><row _id="row-ezwi~ukzn_kqh6" _uuid="00000000-0000-0000-1B23-6ABC4277CF5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezwi~ukzn_kqh6"><intent_id>1042465</intent_id><project_id>910765</project_id><text_data>Dishwasher is free standing. Replaced the water probe and water level float using hand tools.</text_data><comment_date>2020-03-17T00:00:00</comment_date></row><row _id="row-np4e.dsrt-fkuy" _uuid="00000000-0000-0000-0817-CFF555CCDAA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-np4e.dsrt-fkuy"><intent_id>908643</intent_id><project_id>852370</project_id><text_data>Ducharme - 2516 North Shore #4</text_data><comment_date>2018-06-04T00:00:00</comment_date></row><row _id="row-g3nh-aeih-4qty" _uuid="00000000-0000-0000-F2E0-F53B0BD2BF13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g3nh-aeih-4qty"><intent_id>719462</intent_id><project_id>766047</project_id><text_data>other truck -water truck</text_data><comment_date>2015-09-24T00:00:00</comment_date></row><row _id="row-x8zg_uyya.hezw" _uuid="00000000-0000-0000-834F-0D0A847085E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x8zg_uyya.hezw"><intent_id>1211940</intent_id><project_id>999816</project_id><text_data>Please note this information is intended for projected/estimated service prior to dispatching technicians and is based on the customer�s request for service. Submitted for the purpose of obtaining the L&amp;I �Intent� and compliance. Upon completion of the service request, we will file the �Avadavat� confirming actual services preformed, labor hours and notation of any additional tools used outside of the general tools listed below. General tools used by our technicians for electrical component equipment service Multi-Meter, insulated screwdriver, wire nuts, safety locks for lockout/tagout, insulated Allen wrenches.All technicians use company supplied vehicles to arrive at job site</text_data><comment_date>2022-02-16T00:00:00</comment_date></row><row _id="row-vv9e.wfq9-864c" _uuid="00000000-0000-0000-C514-7D6AE325ABD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vv9e.wfq9-864c"><intent_id>567598</intent_id><project_id>472821</project_id><text_data>133051 Sound Transit U220</text_data><comment_date>2013-05-02T00:00:00</comment_date></row><row _id="row-85w3.5wjy-iym6" _uuid="00000000-0000-0000-792E-24746729E333" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-85w3.5wjy-iym6"><intent_id>899777</intent_id><project_id>848832</project_id><text_data>Filed by Patrick Rataezyk</text_data><comment_date>2018-04-20T00:00:00</comment_date></row><row _id="row-cxh2.3gwv_kffr" _uuid="00000000-0000-0000-D112-872805B8EED3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxh2.3gwv_kffr"><intent_id>877282</intent_id><project_id>834612</project_id><text_data>VE# 18651</text_data><comment_date>2017-12-01T00:00:00</comment_date></row><row _id="row-zchi-wznk_fuwt" _uuid="00000000-0000-0000-E09D-058EBD315DC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zchi-wznk_fuwt"><intent_id>838378</intent_id><project_id>820818</project_id><text_data>Scope of work: Street repair.Our scope of work: Hand dig [planting holes to maximum depth and width of 20 inches. Plant 9 3 inch caliper street trees.Feather planting area into existing private lawn/yard areas.Tools to be used: Shovels, picks,rakes, one man power augers (if needed), Wheelbarrows, razor knifes, Broom, power blower</text_data><comment_date>2017-06-08T00:00:00</comment_date></row><row _id="row-63gf_ye7x~2t4i" _uuid="00000000-0000-0000-FD6C-5A99D1D00049" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-63gf_ye7x~2t4i"><intent_id>1248817</intent_id><project_id>1018856</project_id><text_data>Job Number 0322055</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-t3hy_hd6v-7adn" _uuid="00000000-0000-0000-31F4-8007741F2BDC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3hy_hd6v-7adn"><intent_id>776708</intent_id><project_id>797683</project_id><text_data>Filed by Vivian Hurd</text_data><comment_date>2016-07-21T00:00:00</comment_date></row><row _id="row-ykuu~5a2h~i35h" _uuid="00000000-0000-0000-93DD-440CE69267BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ykuu~5a2h~i35h"><intent_id>1053559</intent_id><project_id>916781</project_id><text_data>General labor work consists of hand work (shovel work) no power equipment or power tools. Blade operator is used for grading the project site for compaction before paving and/or chip sealing operations. Other trucks consist of a 0-8,000 gallon water truck used for water distribution during the grading process to help with compaction. Crane Oiler - the actual piece of equipment being operated is an Oil Distributor truck and the wage band approach was utilized, (as per Harvey Means from L&amp;I).</text_data><comment_date>2020-04-23T00:00:00</comment_date></row><row _id="row-skjk-ck4j~dykj" _uuid="00000000-0000-0000-63F3-91674A6A71E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-skjk-ck4j~dykj"><intent_id>1253630</intent_id><project_id>1024268</project_id><text_data>Irrigation repairs. Adjust and replace irrigation heads and nozzles</text_data><comment_date>2022-07-29T00:00:00</comment_date></row><row _id="row-36kg.5aii-ziuc" _uuid="00000000-0000-0000-FC19-CA254A78D08E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-36kg.5aii-ziuc"><intent_id>1036442</intent_id><project_id>907294</project_id><text_data>#1 � The crew will be repairing the porch light and re-securing the gutter#2 - Manufactured Home#3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2020-02-05T00:00:00</comment_date></row><row _id="row-mjsz.4a5s-b4gu" _uuid="00000000-0000-0000-65F0-E90584417FEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mjsz.4a5s-b4gu"><intent_id>840256</intent_id><project_id>824245</project_id><text_data>Carpet Cleaning work</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-x6nk-g9a3~9wzg" _uuid="00000000-0000-0000-D7CC-BA39637199D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x6nk-g9a3~9wzg"><intent_id>777188</intent_id><project_id>788755</project_id><text_data>Filed by Will Dodd</text_data><comment_date>2016-07-25T00:00:00</comment_date></row><row _id="row-2di5~ph3h_zn2e" _uuid="00000000-0000-0000-7D68-491B12800133" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2di5~ph3h_zn2e"><intent_id>752547</intent_id><project_id>787008</project_id><text_data>Eileen Kapono 5652 Woodard Dr Freeland, WA 98243</text_data><comment_date>2016-03-21T00:00:00</comment_date></row><row _id="row-kzxd-d3b3-4zd3" _uuid="00000000-0000-0000-3C27-F9870A18462F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kzxd-d3b3-4zd3"><intent_id>670449</intent_id><project_id>746343</project_id><text_data>Removal and disposal of non hazardous liquids from equipment washpad</text_data><comment_date>2014-12-18T00:00:00</comment_date></row><row _id="row-5pvd~enri-5di3" _uuid="00000000-0000-0000-1610-7D98487F68B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5pvd~enri-5di3"><intent_id>639383</intent_id><project_id>738716</project_id><text_data>General Laborer:  manual labor using hand tools - shovels, rakesTruck Drivers - Other Trucks:  Water Trucks &amp;lt; 8,000 gal tank capacity</text_data><comment_date>2014-07-07T00:00:00</comment_date></row><row _id="row-geaj~yt99.g7rw" _uuid="00000000-0000-0000-1D19-7D84A85B7B62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-geaj~yt99.g7rw"><intent_id>690861</intent_id><project_id>760733</project_id><text_data>Remove existing ground cover plants from planting bed. Removal accomplished using hand tools and 45 hp walk behind Dingo loader</text_data><comment_date>2015-04-24T00:00:00</comment_date></row><row _id="row-k8rq-bz55.pmv7" _uuid="00000000-0000-0000-3553-F247E0CBB74F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k8rq-bz55.pmv7"><intent_id>1022346</intent_id><project_id>899808</project_id><text_data>We will use carpenters and occasional clean up laborer depending up on need.  The project is a call out from the Des Moines PD to board up vacant buisnesses to keep vandals out.</text_data><comment_date>2019-11-18T00:00:00</comment_date></row><row _id="row-emq9-4mjm_gh9d" _uuid="00000000-0000-0000-B109-88BE2812C2B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-emq9-4mjm_gh9d"><intent_id>799839</intent_id><project_id>806536</project_id><text_data>Job # 108467-001</text_data><comment_date>2016-11-04T00:00:00</comment_date></row><row _id="row-unyc-rzep_xyr2" _uuid="00000000-0000-0000-6B74-4FFBAB5EBDEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-unyc-rzep_xyr2"><intent_id>600650</intent_id><project_id>722463</project_id><text_data>1) Work to perform - upgrade exterior lighting throughout property. 2) Structure is an apartment complex3) Structure is 2 stories4) Building use:     a) No commercial use     b) No retail use     c) Yes, building is for permanent residence only     d) No rebilitation     e) No transitional housing     f) No communal dining     g) No treatment facilities     h) No dormitories     i) No counseling services     j) No rooms are not rented seperately, no beds are furnished     k) Other:          5) Yes each unit has a kitchen          6) Yes each unit has a bathroom          7) No community or manager office on site          8) No public areas</text_data><comment_date>2013-10-24T00:00:00</comment_date></row><row _id="row-y5ux_x92k.d79j" _uuid="00000000-0000-0000-C559-5B886EEAAC2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5ux_x92k.d79j"><intent_id>994193</intent_id><project_id>887182</project_id><text_data>WRS Job #C19-542PW</text_data><comment_date>2019-07-24T00:00:00</comment_date></row><row _id="row-ef2m~2wyx-tu7n" _uuid="00000000-0000-0000-17ED-1E2AB853CC90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ef2m~2wyx-tu7n"><intent_id>967888</intent_id><project_id>864274</project_id><text_data>***This form is being approved on the basis of your statement that your employees will perform professional electrical testing services using portable test equipment and will perform no tasks which require the use of hand or construction tools which are considered the work of a laborer, worker, or mechanic within the meaning of the prevailing wage laws. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2019-03-27T00:00:00</comment_date></row><row _id="row-qu5h~y3vf.ct3i" _uuid="00000000-0000-0000-020B-CBEE0C6F14C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qu5h~y3vf.ct3i"><intent_id>962710</intent_id><project_id>874388</project_id><text_data>1. Clean &amp; Tune furnace. 2. Single family dwelling. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2019-02-28T00:00:00</comment_date></row><row _id="row-syau_ieq6~5rvg" _uuid="00000000-0000-0000-E202-403C00593BFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-syau_ieq6~5rvg"><intent_id>825379</intent_id><project_id>817621</project_id><text_data>Filed by R.T. Vatne</text_data><comment_date>2017-04-08T00:00:00</comment_date></row><row _id="row-jn5d.66mj-vmb9" _uuid="00000000-0000-0000-F180-888A8B1F2E19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jn5d.66mj-vmb9"><intent_id>659926</intent_id><project_id>746455</project_id><text_data>1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NOBRUCE HUFFMAN13805 1ST AVE CT ETACOMA 98445</text_data><comment_date>2014-10-13T00:00:00</comment_date></row><row _id="row-hyx7~p8fx-3h3f" _uuid="00000000-0000-0000-FB46-ACA0A2BA1A0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hyx7~p8fx-3h3f"><intent_id>1172478</intent_id><project_id>976717</project_id><text_data>**OTHER TRUCKS - 4,000 GALLON WATER TRUCK</text_data><comment_date>2021-08-26T00:00:00</comment_date></row><row _id="row-anmg_ffm7-2qfg" _uuid="00000000-0000-0000-2A07-97DACB25EF08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-anmg_ffm7-2qfg"><intent_id>1257665</intent_id><project_id>1026310</project_id><text_data>Irrigation repairs to existing irrigation system</text_data><comment_date>2022-08-12T00:00:00</comment_date></row><row _id="row-m4rs~3xwx_h49y" _uuid="00000000-0000-0000-A033-7DCD98ECD04E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m4rs~3xwx_h49y"><intent_id>920532</intent_id><project_id>853119</project_id><text_data>General Laborer with the wage $44.06 is the U/G Supervisor</text_data><comment_date>2018-07-24T00:00:00</comment_date></row><row _id="row-qxjw.qi2s.qx6e" _uuid="00000000-0000-0000-50FD-AAF8255FA888" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qxjw.qi2s.qx6e"><intent_id>812994</intent_id><project_id>797667</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2017-01-26T00:00:00</comment_date></row><row _id="row-h8fk_dsdq_d5qv" _uuid="00000000-0000-0000-2685-754624E3B4CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h8fk_dsdq_d5qv"><intent_id>786469</intent_id><project_id>801361</project_id><text_data>JOURNEYMAN GLAZIER:DRUG TESTING/WCISAP $0.06, PENSION $9.16, HEALTH &amp; WELFARE $6.40, APPRENTICE $0.60, LMCI $0.10WAGE INCREASED TO $41.59/HRFRINGE BENEFITS INCREASED TO $16.32/HRJOURNEYMAN LEVEL WAGE: $41.59/HR(EFFECTIVE JULY 1, 2016 THROUGH JUNE 30, 2017)</text_data><comment_date>2016-08-31T00:00:00</comment_date></row><row _id="row-jrxg-rnhm_wb2a" _uuid="00000000-0000-0000-917D-6BEFFC6C621A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jrxg-rnhm_wb2a"><intent_id>1128060</intent_id><project_id>953901</project_id><text_data>Blythe service work order 94831^</text_data><comment_date>2021-03-11T00:00:00</comment_date></row><row _id="row-kyhp_e96g-qcs8" _uuid="00000000-0000-0000-0E34-A312C7E0D433" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kyhp_e96g-qcs8"><intent_id>1090490</intent_id><project_id>932599</project_id><text_data>General Laborer is hand work only (no power tools or equipment) $32.83 base + $8.21 pensionCrane Oiler/Driver is being used for Oil Distributor. Wage Band Approach is being used per Harvey Means $37.83 base + $9.46 pensionOther trucks is an 0 to 8,000 gallon water truck used to help with compaction and dust control. $38.45 base + $9.61 pension</text_data><comment_date>2020-09-23T00:00:00</comment_date></row><row _id="row-t525~enim-4z7c" _uuid="00000000-0000-0000-23E9-C03D3D2F0794" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t525~enim-4z7c"><intent_id>1036955</intent_id><project_id>903716</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2020-02-07T00:00:00</comment_date></row><row _id="row-napz_wrwn.uncz" _uuid="00000000-0000-0000-2F47-7CD4FEE8D825" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-napz_wrwn.uncz"><intent_id>716327</intent_id><project_id>762462</project_id><text_data>Install water back flow preventer</text_data><comment_date>2015-08-24T00:00:00</comment_date></row><row _id="row-xsgy_gmq5-48sm" _uuid="00000000-0000-0000-E154-8A18B99CA645" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xsgy_gmq5-48sm"><intent_id>494319</intent_id><project_id>680277</project_id><text_data>Includes the following locations: Trinity, Advanced Life Support, Fire Station 11, Fire Station Maintenance #16, Maintenance Ops Center, Community Center, Park Maintenance Ops, Public Safety Building, RTC Police SubStation, Sammamish River Business Park, Senior Center, Y Team Building Teen Center,</text_data><comment_date>2011-12-28T00:00:00</comment_date></row><row _id="row-vbvi-4337_kj3v" _uuid="00000000-0000-0000-09C1-24CAE8550F4E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vbvi-4337_kj3v"><intent_id>984174</intent_id><project_id>884027</project_id><text_data>INSTALLER: MELTONI CONSTRUCTIONINSTALLER: RINDAL'S FLOOR COVERING</text_data><comment_date>2019-06-12T00:00:00</comment_date></row><row _id="row-3vei-73fe-i975" _uuid="00000000-0000-0000-01E5-C2A376243258" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vei-73fe-i975"><intent_id>1232044</intent_id><project_id>1012287</project_id><text_data>9887015</text_data><comment_date>2022-05-09T00:00:00</comment_date></row><row _id="row-z9s3_c56k.cj36" _uuid="00000000-0000-0000-9CA4-3F723BFFC127" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z9s3_c56k.cj36"><intent_id>1239501</intent_id><project_id>1016623</project_id><text_data>Estimate 24062 $984.60</text_data><comment_date>2022-06-07T00:00:00</comment_date></row><row _id="row-bbxa.rfp8.vn73" _uuid="00000000-0000-0000-3C8F-756716F70628" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bbxa.rfp8.vn73"><intent_id>534579</intent_id><project_id>695974</project_id><text_data>23 manufactured homes in Edge Lake Mobile Park.</text_data><comment_date>2012-09-16T00:00:00</comment_date></row><row _id="row-yjy7~mmcm_h6zr" _uuid="00000000-0000-0000-5EFA-CFE3D3675118" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yjy7~mmcm_h6zr"><intent_id>728237</intent_id><project_id>772369</project_id><text_data>&amp;quot;TRUCK DRIVER OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK; &amp;quot;POWER EQUIPMENT OPERATOR MOTOR PATROL GRADER FINISHER&amp;quot; - NOT MOTOR PATROL, VACTOR GUZZLER/VACCON SUPER SUCKER</text_data><comment_date>2015-10-26T00:00:00</comment_date></row><row _id="row-gswr.7a4x_2rri" _uuid="00000000-0000-0000-AC5D-A3A785B496CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gswr.7a4x_2rri"><intent_id>582305</intent_id><project_id>713744</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2013-07-19T00:00:00</comment_date></row><row _id="row-2hqn~cvpg~4msu" _uuid="00000000-0000-0000-4B51-A05276140691" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2hqn~cvpg~4msu"><intent_id>1068256</intent_id><project_id>923686</project_id><text_data>Telecommunication Technicians: pulling fiber-optic cableElectronic Technicians: head-end work</text_data><comment_date>2020-06-26T00:00:00</comment_date></row><row _id="row-ic3f_nujy.q85m" _uuid="00000000-0000-0000-B407-1BF1BD5204AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ic3f_nujy.q85m"><intent_id>564854</intent_id><project_id>708951</project_id><text_data>MOTOR PATROL GRADER NON - WILL BLADE/GRADE THE ROAD TO MAKE IT A FLAT SURFACE TO PREPARE THE ROAD TO BE PAVED												OTHER TRUCKS - OIL DISTRIBUTOR DRIVER - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH OIL/TACK PRIOR TO PLACING ASPHALT															OTHER TRUCKS - WATER TANK TRUCK - WILL SPRAY THE ROAD WITH WATER FOR DUST CONTROL</text_data><comment_date>2013-04-16T00:00:00</comment_date></row><row _id="row-v696_xnmj.85s3" _uuid="00000000-0000-0000-4953-D8E5FBCD42F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v696_xnmj.85s3"><intent_id>1357254</intent_id><project_id>1083680</project_id><text_data>The subcontractor's duties for this project were to bring playground material in their truck to the facility where everything was marked and ready for their guy (landscape construction) to take a hose and blow the product on the playground where they were told to.</text_data><comment_date>2023-08-24T00:00:00</comment_date></row><row _id="row-qe25.cs5j~nk64" _uuid="00000000-0000-0000-2B6B-CE086AB9F9CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qe25.cs5j~nk64"><intent_id>886019</intent_id><project_id>839965</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trade occupations.</text_data><comment_date>2018-01-31T00:00:00</comment_date></row><row _id="row-tsx8-sqy5~xpzu" _uuid="00000000-0000-0000-4F4B-C52CC7E56AA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsx8-sqy5~xpzu"><intent_id>1194370</intent_id><project_id>988705</project_id><text_data>Arbor Care -17400 Newport way- Dead leaning Tree- AN 318357 Per Brian JohnsonWO #93392Fall 2021 Requested RemovalTree Quantity: 1Proposal Value: $11,891November 19, 2021Proposal #: 318357Hazard Tree (1)- Removal/Flush Cut</text_data><comment_date>2021-11-19T00:00:00</comment_date></row><row _id="row-kvwz.fz5s~xt5n" _uuid="00000000-0000-0000-EB62-7D58119709AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvwz.fz5s~xt5n"><intent_id>575092</intent_id><project_id>709859</project_id><text_data>Filed By:  Norman Broome</text_data><comment_date>2013-06-13T00:00:00</comment_date></row><row _id="row-hqqq.kdju~h45n" _uuid="00000000-0000-0000-39BA-15BF0674E7F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hqqq.kdju~h45n"><intent_id>995070</intent_id><project_id>882467</project_id><text_data>46983</text_data><comment_date>2019-07-26T00:00:00</comment_date></row><row _id="row-r3jc-q5tp~b33f" _uuid="00000000-0000-0000-F899-15C6C91D7B02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r3jc-q5tp~b33f"><intent_id>762622</intent_id><project_id>792209</project_id><text_data>Clear Valley Drive, Maple Falls1. Air seal, duct seal, belly repair2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. No</text_data><comment_date>2016-05-17T00:00:00</comment_date></row><row _id="row-gw55-67zz.ms8j" _uuid="00000000-0000-0000-DD6F-10790E0E1B98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gw55-67zz.ms8j"><intent_id>951759</intent_id><project_id>869156</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT. IT IS A SINGLE FAMILY, RESIDENTIAL DWELLING.</text_data><comment_date>2018-12-20T00:00:00</comment_date></row><row _id="row-utn5_t9iw.peks" _uuid="00000000-0000-0000-AA58-5600A843C9FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utn5_t9iw.peks"><intent_id>453904</intent_id><project_id>634121</project_id><text_data>we will install design build irrigation system, lay sod, and install plant material. we will use equipment such as shovels, rakes, wheel barrows.</text_data><comment_date>2011-05-02T00:00:00</comment_date></row><row _id="row-bcpj~dk2x~wd9q" _uuid="00000000-0000-0000-3E24-A5A15A03F58B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bcpj~dk2x~wd9q"><intent_id>958321</intent_id><project_id>872285</project_id><text_data>Install cables that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2019-02-01T00:00:00</comment_date></row><row _id="row-jhrm_q5v6_i2x6" _uuid="00000000-0000-0000-D799-9443402FA2D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jhrm_q5v6_i2x6"><intent_id>637948</intent_id><project_id>738187</project_id><text_data>(3) crew will clean large outdoor sculpture using pressure washer and genie lift, then apply coat of wax to bronze sculpture.</text_data><comment_date>2014-06-27T00:00:00</comment_date></row><row _id="row-b9gr_8zaz-v3sz" _uuid="00000000-0000-0000-FE42-EF677ED38248" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9gr_8zaz-v3sz"><intent_id>1258092</intent_id><project_id>1026517</project_id><text_data>WORK FOR PAUL ANDERSON@ SE 63RD</text_data><comment_date>2022-08-15T00:00:00</comment_date></row><row _id="row-y4xp-3sw4_zqxq" _uuid="00000000-0000-0000-6580-4C2B688FE6D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y4xp-3sw4_zqxq"><intent_id>1099204</intent_id><project_id>937854</project_id><text_data>The sculpture is being fabricated in Hayden, Idaho- Kootenai County.  Expected onsite work for installation in Spokane, WA will begin as early as October 19, 2020.</text_data><comment_date>2020-10-27T00:00:00</comment_date></row><row _id="row-8pt3.ss7b~vch6" _uuid="00000000-0000-0000-2DCE-0983C51D0EE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8pt3.ss7b~vch6"><intent_id>951837</intent_id><project_id>866099</project_id><text_data>The Subcontractor we are hiring is Fantastic 4 Corporation UBI 604208944, License No FANTA4C822BT.</text_data><comment_date>2018-12-20T00:00:00</comment_date></row><row _id="row-v27b-qr5v.s557" _uuid="00000000-0000-0000-60F7-3C4FB4FAC48E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v27b-qr5v.s557"><intent_id>552239</intent_id><project_id>697124</project_id><text_data>Form Filed By: Michael F. Schultz</text_data><comment_date>2013-01-16T00:00:00</comment_date></row><row _id="row-h2eu_qiz2.gfwv" _uuid="00000000-0000-0000-FB39-1830A96A7A86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2eu_qiz2.gfwv"><intent_id>626288</intent_id><project_id>729785</project_id><text_data>BRIAR GROUP INC. WILL BE PROVIDING HYDROSEEDING ONLY ON THIS PROJECT.</text_data><comment_date>2014-04-23T00:00:00</comment_date></row><row _id="row-dfe9-frc3_rj2x" _uuid="00000000-0000-0000-902A-897BDEBC5F7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfe9-frc3_rj2x"><intent_id>956120</intent_id><project_id>871223</project_id><text_data>CHELANS243</text_data><comment_date>2019-01-21T00:00:00</comment_date></row><row _id="row-cecy-zbih~ca9i" _uuid="00000000-0000-0000-A3C1-1D19E1F4A25D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cecy-zbih~ca9i"><intent_id>620832</intent_id><project_id>731200</project_id><text_data>Form filed by: Jacqueline Haberkom</text_data><comment_date>2014-03-19T00:00:00</comment_date></row><row _id="row-ztvx_vzgv.n3zr" _uuid="00000000-0000-0000-081F-0F6A7568C11E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ztvx_vzgv.n3zr"><intent_id>684179</intent_id><project_id>757800</project_id><text_data>Jessica Linares2740 Dawn LaneCuster, WA 98240$307.85</text_data><comment_date>2015-03-17T00:00:00</comment_date></row><row _id="row-ty5m-cwgk_b64i" _uuid="00000000-0000-0000-1A4E-B93CA40BD4CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ty5m-cwgk_b64i"><intent_id>981812</intent_id><project_id>882865</project_id><text_data>CompuNet is only providing Project Mgmt and is subcontracting the installation and configuration to McKinstry Co.</text_data><comment_date>2019-06-03T00:00:00</comment_date></row><row _id="row-53fy~kvjp.d4xv" _uuid="00000000-0000-0000-3FD1-951D1F93CF61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-53fy~kvjp.d4xv"><intent_id>476551</intent_id><project_id>664374</project_id><text_data>NW Sheet Metal Workers Pension $6.93National Pension Contribution 4.24NW Health Care 8.68International Training Institute .17Apprenticeship Fund 1.00Industry Fund .60Organizational Trust Fund .75NW Supplemental Plan .79Clean Card .07</text_data><comment_date>2011-09-07T00:00:00</comment_date></row><row _id="row-ftnt.arp6-rw7j" _uuid="00000000-0000-0000-05FE-903DD7732015" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ftnt.arp6-rw7j"><intent_id>664805</intent_id><project_id>748456</project_id><text_data>Intent was not filed previous to job start because the original Notice To Proceed was just an estimate and we were waiting for revised Notice To Proceed once the price was agreed to.</text_data><comment_date>2014-11-10T00:00:00</comment_date></row><row _id="row-3n37.h2vw-bvr4" _uuid="00000000-0000-0000-DC4F-8A60706126B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3n37.h2vw-bvr4"><intent_id>902350</intent_id><project_id>828714</project_id><text_data>STONEWAY CONCRETE IS A SUPPLIER</text_data><comment_date>2018-05-03T00:00:00</comment_date></row><row _id="row-7kn9~ancc~7gj4" _uuid="00000000-0000-0000-A989-8A0436D5C290" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7kn9~ancc~7gj4"><intent_id>673219</intent_id><project_id>752386</project_id><text_data>Complete dormant oil application for trees.  Done by our subcontractor</text_data><comment_date>2015-01-12T00:00:00</comment_date></row><row _id="row-yaqm-2i6d_wz4e" _uuid="00000000-0000-0000-DACC-6D7C9859D7C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yaqm-2i6d_wz4e"><intent_id>711287</intent_id><project_id>766728</project_id><text_data>other truck to haul equipment</text_data><comment_date>2015-07-31T00:00:00</comment_date></row><row _id="row-v3x8~b7zz~ezda" _uuid="00000000-0000-0000-2D34-B22F07499986" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3x8~b7zz~ezda"><intent_id>503880</intent_id><project_id>684205</project_id><text_data>Install control board in package unit</text_data><comment_date>2012-03-14T00:00:00</comment_date></row><row _id="row-vqfx.ibaq-3kq9" _uuid="00000000-0000-0000-66D2-DDCEE8F30EAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vqfx.ibaq-3kq9"><intent_id>830782</intent_id><project_id>789381</project_id><text_data>LABOR AND MATERIALS TO INSTALL TELECOMMUNICATION CABLING SYSTEM</text_data><comment_date>2017-05-03T00:00:00</comment_date></row><row _id="row-gwp6_trai~8qzf" _uuid="00000000-0000-0000-83EB-C8DAE79274CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gwp6_trai~8qzf"><intent_id>860200</intent_id><project_id>786385</project_id><text_data>Submitting with Industrial Insurance ID 64005100</text_data><comment_date>2017-10-04T00:00:00</comment_date></row><row _id="row-zh89~vdtd~wvcv" _uuid="00000000-0000-0000-383F-9570C1A0FB17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zh89~vdtd~wvcv"><intent_id>819567</intent_id><project_id>815095</project_id><text_data>Prosser Memorial HospEmployees drive 250 Chevy Silverado or similar vehicle to and from job site.</text_data><comment_date>2017-03-08T00:00:00</comment_date></row><row _id="row-8qc6_d6ei~iktv" _uuid="00000000-0000-0000-A981-C514C43D1836" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8qc6_d6ei~iktv"><intent_id>1186659</intent_id><project_id>971486</project_id><text_data>Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2021-10-21T00:00:00</comment_date></row><row _id="row-uh3m.tyts-52e4" _uuid="00000000-0000-0000-563A-1955A6593C74" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uh3m.tyts-52e4"><intent_id>1034711</intent_id><project_id>900213</project_id><text_data>Holroyd Company, Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington, andHolroyd Company, Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2020-01-29T00:00:00</comment_date></row><row _id="row-x8gm_pbfp_q7bd" _uuid="00000000-0000-0000-A12C-AC5F10C2FF30" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x8gm_pbfp_q7bd"><intent_id>1281096</intent_id><project_id>1034715</project_id><text_data>Tyler LaFavor and Jeff Maldonado 7am-1pm 10/19/22</text_data><comment_date>2022-11-03T00:00:00</comment_date></row><row _id="row-em56-pdye_fv5s" _uuid="00000000-0000-0000-543F-136CB8307C9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-em56-pdye_fv5s"><intent_id>1136144</intent_id><project_id>852196</project_id><text_data>The truck driver of the Slinger Dump Truck will install bark and or mulch to a depth of 2 to 4 inches.</text_data><comment_date>2021-04-20T00:00:00</comment_date></row><row _id="row-ehhc-x55e-pa7e" _uuid="00000000-0000-0000-EBF5-D4352F10547C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ehhc-x55e-pa7e"><intent_id>968946</intent_id><project_id>877289</project_id><text_data>17-721-12</text_data><comment_date>2019-04-02T00:00:00</comment_date></row><row _id="row-wrah~dskg_zc66" _uuid="00000000-0000-0000-C432-DD079FCF80A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wrah~dskg_zc66"><intent_id>832448</intent_id><project_id>820517</project_id><text_data>The Other Truck is used as a water truck for dust control that holds less than 5000 gallons of water.</text_data><comment_date>2017-05-11T00:00:00</comment_date></row><row _id="row-iapk-9jqb.ddrc" _uuid="00000000-0000-0000-446A-7BBBDCF00FB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iapk-9jqb.ddrc"><intent_id>808861</intent_id><project_id>810152</project_id><text_data>1)HVAC service, 2) Single Family Residence, 3) One level , 4) A)NO, B)NO, C)YES, D)NO, E)NO, F)NO, G)NO, H)NO, I)NO, J)NO, 5) one kitchen in residence, 6) one bathroom in home,  7) No, 8) No</text_data><comment_date>2016-12-28T00:00:00</comment_date></row><row _id="row-kddf.464y-kger" _uuid="00000000-0000-0000-9FA4-1AD1C29F7C6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kddf.464y-kger"><intent_id>507231</intent_id><project_id>524016</project_id><text_data>Form filed by: Todd Kahl - murq235</text_data><comment_date>2012-04-10T00:00:00</comment_date></row><row _id="row-jjjt_miwk-66qf" _uuid="00000000-0000-0000-A2B6-9EA56F4A9236" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jjjt_miwk-66qf"><intent_id>729511</intent_id><project_id>730869</project_id><text_data>065051</text_data><comment_date>2015-11-03T00:00:00</comment_date></row><row _id="row-2snp-ws2v~kzxi" _uuid="00000000-0000-0000-63F1-4A276CEDED01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2snp-ws2v~kzxi"><intent_id>1154539</intent_id><project_id>965637</project_id><text_data>Job 190</text_data><comment_date>2021-06-22T00:00:00</comment_date></row><row _id="row-yw9h-xzrx~au9j" _uuid="00000000-0000-0000-BB2A-8FEBE6579E50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yw9h-xzrx~au9j"><intent_id>852427</intent_id><project_id>829061</project_id><text_data>This project is procured as a GC/CM project with multiple GMP&amp;#39;s for the City of Spokane. This intent covers GMP #4 in the contract amount of $41,694,410.00,for phase 1 balance of plant.</text_data><comment_date>2017-08-03T00:00:00</comment_date></row><row _id="row-iezs~n7u3-jeep" _uuid="00000000-0000-0000-B8E5-7215F37FD6B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iezs~n7u3-jeep"><intent_id>962357</intent_id><project_id>874214</project_id><text_data>500 4TH AVE ROOM 800, 326 9TH AVE, 500 5TH AVE, 420 4TH AVE</text_data><comment_date>2019-02-27T00:00:00</comment_date></row><row _id="row-3veg-enss~c7ua" _uuid="00000000-0000-0000-8913-64B7AFE853B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3veg-enss~c7ua"><intent_id>1012452</intent_id><project_id>895352</project_id><text_data>Telecommunication wi-fi cablingAll work wiil be done indoors</text_data><comment_date>2019-10-17T00:00:00</comment_date></row><row _id="row-ygmz~79bn~ur8v" _uuid="00000000-0000-0000-F5A7-B0389CCD62E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ygmz~79bn~ur8v"><intent_id>1152750</intent_id><project_id>966706</project_id><text_data>Annual fire sprinkler system inspection service.</text_data><comment_date>2021-06-15T00:00:00</comment_date></row><row _id="row-cqyx~tai3_mkc7" _uuid="00000000-0000-0000-3CF9-0993A088499D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqyx~tai3_mkc7"><intent_id>953401</intent_id><project_id>869932</project_id><text_data>Filed by Tracy Middlebrook - Project is exempt from state prevailing wage rate requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following occupations:</text_data><comment_date>2019-01-04T00:00:00</comment_date></row><row _id="row-r2wt~xcuv.ymik" _uuid="00000000-0000-0000-B3C5-0E8F75189FD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r2wt~xcuv.ymik"><intent_id>593971</intent_id><project_id>720089</project_id><text_data>Job # 200494</text_data><comment_date>2013-09-16T00:00:00</comment_date></row><row _id="row-ng7u-n59t-u8x2" _uuid="00000000-0000-0000-F782-CB2797C2F4CF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ng7u-n59t-u8x2"><intent_id>473771</intent_id><project_id>672845</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2013-10-08T00:00:00</comment_date></row><row _id="row-4idd~9img_7w4i" _uuid="00000000-0000-0000-6810-D5B7360CE9BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4idd~9img_7w4i"><intent_id>751730</intent_id><project_id>787377</project_id><text_data>Dump Truck: is 10 Cubic Yard End Dump.Other Truck: Water Truck is 2000 gallon tank.</text_data><comment_date>2016-03-16T00:00:00</comment_date></row><row _id="row-wkqj.96x5_ju7x" _uuid="00000000-0000-0000-D80D-3DB8909E9C05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wkqj.96x5_ju7x"><intent_id>515311</intent_id><project_id>671321</project_id><text_data>Filed by: Scott Daiger</text_data><comment_date>2012-06-06T00:00:00</comment_date></row><row _id="row-k8ra.y5zv-zza8" _uuid="00000000-0000-0000-C27A-1ED1FF37F4FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k8ra.y5zv-zza8"><intent_id>896393</intent_id><project_id>847376</project_id><text_data>#16-517-14</text_data><comment_date>2018-04-03T00:00:00</comment_date></row><row _id="row-be6y_pgui~i3ec" _uuid="00000000-0000-0000-EB79-EA814AF7F1C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-be6y_pgui~i3ec"><intent_id>1012924</intent_id><project_id>837002</project_id><text_data>The workers sent by Express Services Franchise office: 131 W 4th Ave Moses Lake, WA 98837 Contact: Naomi Tijerina JAC Construction LLC only utilized our services for one day</text_data><comment_date>2019-10-08T00:00:00</comment_date></row><row _id="row-apsi~5ved_a73f" _uuid="00000000-0000-0000-F5A0-5CF70E5B804F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-apsi~5ved_a73f"><intent_id>662908</intent_id><project_id>740619</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborer Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters  Union)</text_data><comment_date>2014-10-29T00:00:00</comment_date></row><row _id="row-inau~7e2h-uccz" _uuid="00000000-0000-0000-A093-DF76CBCA2275" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-inau~7e2h-uccz"><intent_id>1019295</intent_id><project_id>879214</project_id><text_data>1119044</text_data><comment_date>2019-11-01T00:00:00</comment_date></row><row _id="row-2nm5.vraw-b7iu" _uuid="00000000-0000-0000-6E08-FE0CA62F1492" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2nm5.vraw-b7iu"><intent_id>817328</intent_id><project_id>813349</project_id><text_data>Note:  Our general laborers unload and distribute cabinets from our delivery truck to various rooms on the jobsite.  The only tools used are hand trucks and rolling carts.Our trucks are 14� and 26� box trucks for delivery of cabinets</text_data><comment_date>2017-02-22T00:00:00</comment_date></row><row _id="row-zgtd_s8ze-ighv" _uuid="00000000-0000-0000-7EF3-6DCB504D4C55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zgtd_s8ze-ighv"><intent_id>1142089</intent_id><project_id>893997</project_id><text_data>JTech, NEBF $1.15, H&amp;W $6.00, Pension $4.30, 401K $3.10, JATC $0.55.</text_data><comment_date>2021-05-05T00:00:00</comment_date></row><row _id="row-suqy.icag.f7vs" _uuid="00000000-0000-0000-8C56-C792A38563EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-suqy.icag.f7vs"><intent_id>662160</intent_id><project_id>734115</project_id><text_data>HEAVY HAUL TRUCKS HAULING CONCRETE BRIDGE GIRDERS WITH STEER TRAILERS.</text_data><comment_date>2014-10-24T00:00:00</comment_date></row><row _id="row-ngxw.zarv_6i7s" _uuid="00000000-0000-0000-DFAC-B62BAB5BBF91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ngxw.zarv_6i7s"><intent_id>1027318</intent_id><project_id>837002</project_id><text_data>PN # 48343 SPK</text_data><comment_date>2019-12-17T00:00:00</comment_date></row><row _id="row-q7cp~npth-cdqe" _uuid="00000000-0000-0000-2559-F80AA7444956" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q7cp~npth-cdqe"><intent_id>1267519</intent_id><project_id>1021336</project_id><text_data>OTHER TRUCK IS SEMI TRUCK WITH A FLAT BED USED TO HAUL MEDIAN BARRIER OTHER TRUCK IS STREET/SELF PROPELLED SWEEPER TRUCK</text_data><comment_date>2022-09-18T00:00:00</comment_date></row><row _id="row-4k2p_zrh9_eg4t" _uuid="00000000-0000-0000-EA04-1B40CF5AFE8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4k2p_zrh9_eg4t"><intent_id>1022814</intent_id><project_id>898718</project_id><text_data>Interior Paint and Carpentry, Single family dwelling, 1 story, No. No. Yes. No. No. No. No. No. No. No. no. yes. yes. no. No.</text_data><comment_date>2019-11-20T00:00:00</comment_date></row><row _id="row-8tgv~fi9j_htce" _uuid="00000000-0000-0000-A51C-028ADAB7C23F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8tgv~fi9j_htce"><intent_id>1054705</intent_id><project_id>917363</project_id><text_data>Corrected</text_data><comment_date>2020-05-06T00:00:00</comment_date></row><row _id="row-c82f-pj2m.yqvc" _uuid="00000000-0000-0000-C36C-87C5D873C7AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c82f-pj2m.yqvc"><intent_id>1056537</intent_id><project_id>918245</project_id><text_data>Job 19768-1</text_data><comment_date>2020-05-07T00:00:00</comment_date></row><row _id="row-aiwc~td8f-2t3i" _uuid="00000000-0000-0000-7DCA-F0BF5B3549CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aiwc~td8f-2t3i"><intent_id>772901</intent_id><project_id>796245</project_id><text_data>KING - HEALTH &amp; WELFARE 8.60 PENSION/ANNUITY 10.00, JATC .68SNOHOMISH - HEALTH &amp; WELFARE 9.94, PENSION/ANNUNITY 8.23, JATC .68</text_data><comment_date>2016-07-14T00:00:00</comment_date></row><row _id="row-ytr5~2ep3_gpg3" _uuid="00000000-0000-0000-F306-36411BB50E17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ytr5~2ep3_gpg3"><intent_id>1202752</intent_id><project_id>993983</project_id><text_data>Project# 03615, Schnabel, Peter, 11612 N Sheridan St, Lot E50, Mead, WA 99021</text_data><comment_date>2022-03-01T00:00:00</comment_date></row><row _id="row-hdpy-qdv2.fytv" _uuid="00000000-0000-0000-7CE4-B376FFB19A4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hdpy-qdv2.fytv"><intent_id>792145</intent_id><project_id>803543</project_id><text_data>Job Order Contract 2014 � Project # 204676 � University of Washington CCE # 73120-0091 � Contract No. 205797</text_data><comment_date>2016-09-27T00:00:00</comment_date></row><row _id="row-zzmb_63d6-jibq" _uuid="00000000-0000-0000-525B-421BC3C135A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zzmb_63d6-jibq"><intent_id>836682</intent_id><project_id>781448</project_id><text_data>Filed by Jennifer Moodie</text_data><comment_date>2017-05-26T00:00:00</comment_date></row><row _id="row-m6e6-cm2e.k9m9" _uuid="00000000-0000-0000-90E4-FBEE474F9730" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6e6-cm2e.k9m9"><intent_id>685639</intent_id><project_id>755893</project_id><text_data>Work will be inside - data wire for bits and bytes for computer applications.</text_data><comment_date>2015-03-25T00:00:00</comment_date></row><row _id="row-ppz7.wzwk~nrzh" _uuid="00000000-0000-0000-1757-804BC725325A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ppz7.wzwk~nrzh"><intent_id>335183</intent_id><project_id>660842</project_id><text_data>The prime contractor is us..Long Painting Company.  It doesn't allow me to reselect the same info.</text_data><comment_date>2011-03-10T00:00:00</comment_date></row><row _id="row-ahx2-7wve-uwac" _uuid="00000000-0000-0000-697E-7F69232030C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ahx2-7wve-uwac"><intent_id>1120090</intent_id><project_id>949284</project_id><text_data>A)     Daritech has not been privy to any project details other than the piece we were contracted to do.B)     Daritech was tasked with providing a solution to improve flow characteristics and reduce pump wear in in the transfer of manure solids from D&amp;A Dairy to GDR Dairy. Project includes building an ETL listed control panel (to be installed by licensed electrician), building and installing an 60hp �booster� pump with fabricated pump manifold. The process is controlled through a PLC interface which takes information provided by the pressure transducers on both the suction and discharge sides of the booster pump. This information operates the VFD on the pump motor through a P&amp;ID loop. There is also a pump bypass option operated by a series of manual valves. Installation includes setting the pump and securing to concrete pad, intercepting the 4� PVC main line and making the plumbing connections to the pumps. C)     Duties performed includes: �        Finish assembly on pump utilizing hand and power tools�        Fabrication of pump manifold utilizing band saw, electric grinder, MIG welder, hand and power tools�        Installing pump utilizing crane truck, stick welder, hand and power tools</text_data><comment_date>2021-02-11T00:00:00</comment_date></row><row _id="row-dcp5-5sej_7xwn" _uuid="00000000-0000-0000-2951-5514708EA709" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dcp5-5sej_7xwn"><intent_id>608709</intent_id><project_id>725730</project_id><text_data>The hired electrician is an entry level apprentice who is going through the JATC apprentiship program.</text_data><comment_date>2013-12-17T00:00:00</comment_date></row><row _id="row-herz-8ein.76j5" _uuid="00000000-0000-0000-8CC3-A685400E6E96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-herz-8ein.76j5"><intent_id>1233649</intent_id><project_id>915541</project_id><text_data>Stoneway Concrete is a Material Supplier</text_data><comment_date>2022-05-16T00:00:00</comment_date></row><row _id="row-rtnp~z8ps_xcfi" _uuid="00000000-0000-0000-9C9D-D8BF5E705DD0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rtnp~z8ps_xcfi"><intent_id>879129</intent_id><project_id>838285</project_id><text_data>Carolina Sosa714 Elm St.Tieton, WA 98947</text_data><comment_date>2017-12-14T00:00:00</comment_date></row><row _id="row-984m.imbv~pemz" _uuid="00000000-0000-0000-86FC-4B18B16B78C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-984m.imbv~pemz"><intent_id>855713</intent_id><project_id>830297</project_id><text_data>Fringe Breakdown: Operators $15.05 - $4.70 Medical,$.10 Life Insurance, $.75 Vacation, $.30 Holiday, $.14 Apprentice, $9.06 PensionLaborers- $14.05 - $4.70 Medical, $.10 Life Insurance, $.75 Vacation, $.30 Holiday, $.14 Apprentice, $9.06 PensionDrivers: $16.44- $4.70 Medical, $.10 Life Insurance, $.75 Vacation, $.30 Holiday, $.14 Apprentice, $9.06 Pension</text_data><comment_date>2017-08-18T00:00:00</comment_date></row><row _id="row-nntc_vfmv.iw49" _uuid="00000000-0000-0000-4574-E8C17905C318" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nntc_vfmv.iw49"><intent_id>1120211</intent_id><project_id>926087</project_id><text_data>PR36465 - Parkview Elementary</text_data><comment_date>2021-02-04T00:00:00</comment_date></row><row _id="row-9buc-9ajd~448i" _uuid="00000000-0000-0000-858E-3103E9178515" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9buc-9ajd~448i"><intent_id>585471</intent_id><project_id>715194</project_id><text_data>MMFS JOb#7336522</text_data><comment_date>2013-08-05T00:00:00</comment_date></row><row _id="row-fr7q_cxpa-hwu8" _uuid="00000000-0000-0000-22E6-443EDE7A5504" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fr7q_cxpa-hwu8"><intent_id>1224059</intent_id><project_id>1007575</project_id><text_data>This is a 1 year contract with Pierce County and will be emergency response to remediate dangerous/hazardous materials.  Each call will determine a different level of response.  There may be 1 employee responding or there may be 5 that respond.</text_data><comment_date>2022-04-07T00:00:00</comment_date></row><row _id="row-kyvn-m5ky~3524" _uuid="00000000-0000-0000-DE51-9F15AEEBAAE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kyvn-m5ky~3524"><intent_id>536414</intent_id><project_id>696622</project_id><text_data>Dig up sink hole where irrigation washed out - refill and patch - installed new manhole cover.</text_data><comment_date>2012-09-25T00:00:00</comment_date></row><row _id="row-uwu3~cbak~8hwb" _uuid="00000000-0000-0000-E863-F5D9670EE4BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwu3~cbak~8hwb"><intent_id>936594</intent_id><project_id>862831</project_id><text_data>WO #8038395</text_data><comment_date>2018-10-01T00:00:00</comment_date></row><row _id="row-sr2k.7ipj-tbr3" _uuid="00000000-0000-0000-5145-BD8E592CFD37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sr2k.7ipj-tbr3"><intent_id>1071853</intent_id><project_id>925247</project_id><text_data>09-20-033R</text_data><comment_date>2020-07-13T00:00:00</comment_date></row><row _id="row-y63z_ecg9-dhvw" _uuid="00000000-0000-0000-E272-2B39C2C6D8BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y63z_ecg9-dhvw"><intent_id>590969</intent_id><project_id>718935</project_id><text_data>063032</text_data><comment_date>2013-08-30T00:00:00</comment_date></row><row _id="row-prme-ibb7.v8fy" _uuid="00000000-0000-0000-DDC7-B83EC34AF008" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prme-ibb7.v8fy"><intent_id>746083</intent_id><project_id>758133</project_id><text_data>Our workers were hired to clean windows and floors as part of the cleanup from the construction.</text_data><comment_date>2016-02-16T00:00:00</comment_date></row><row _id="row-gucd~egez~2p6j" _uuid="00000000-0000-0000-57E5-7F25C3DE7761" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gucd~egez~2p6j"><intent_id>729015</intent_id><project_id>775706</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. - INSULATION IN RESIDENTIAL HOME#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? SINGLE FAMILY HOME#3 - Including any basement or garage, how many stories or levels does the structure have? 1#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO&amp;#160;(e) Transitional housing?NO&amp;#160;(f) Communal dining facility?NO (g) Treatment services?&amp;#160;(h) Dormitories? NO(i) Counseling?NO&amp;#160;(j) Is each room and/or bed in the structure rented separately?NO (k) Other?&amp;#160;#5 - Does each dwelling unit have its own self-contained kitchen? yes#6 - Does each dwelling unit have its own bathroom? yes#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public?NO</text_data><comment_date>2015-10-29T00:00:00</comment_date></row><row _id="row-jrre_mrp9-esvx" _uuid="00000000-0000-0000-59E9-A6F953E18011" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jrre_mrp9-esvx"><intent_id>454222</intent_id><project_id>662194</project_id><text_data>RW Scott the general hired Out West Landscape as a subcontractor</text_data><comment_date>2011-05-12T00:00:00</comment_date></row><row _id="row-nnk2-yr48_gmsk" _uuid="00000000-0000-0000-5B8F-84118FEA01BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nnk2-yr48_gmsk"><intent_id>1161992</intent_id><project_id>940769</project_id><text_data>Annuity 7.95, Health &amp; Welfare 9.16, Pension 11.00, Paid Time Off 2.40, Apprenticeship .74, Impact .28, Industry .01</text_data><comment_date>2021-07-21T00:00:00</comment_date></row><row _id="row-8s46-6ujs-ywef" _uuid="00000000-0000-0000-52B1-6BBF732A6F50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8s46-6ujs-ywef"><intent_id>1257054</intent_id><project_id>1023674</project_id><text_data>SPM #27084</text_data><comment_date>2022-08-10T00:00:00</comment_date></row><row _id="row-fkax.n5pz.nhmw" _uuid="00000000-0000-0000-D135-B68CCFEBCA62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fkax.n5pz.nhmw"><intent_id>471414</intent_id><project_id>667139</project_id><text_data>Hiring Contractor is now correct.</text_data><comment_date>2011-08-26T00:00:00</comment_date></row><row _id="row-iqfr~4z9m.z7za" _uuid="00000000-0000-0000-0F39-11C5FA89FD1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iqfr~4z9m.z7za"><intent_id>467609</intent_id><project_id>601805</project_id><text_data>Fringe Breakdown:NW Sheet Metal Workers Pension $6.93National Pension Contribution $4.24NW Health Care $7.50NW Health Care Extended $0.15NW Health Care VEBA $1.03Int'l Training Institute $.12NEMI $0.03SMOHIT $0.02Apprenticeship Fund $1.00Industry Fund $0.60Organizational Trust Fund $0.75NW Supplemental Plan $0.79Clean Card $0.07</text_data><comment_date>2011-07-22T00:00:00</comment_date></row><row _id="row-twzn-nsww_tt9y" _uuid="00000000-0000-0000-A060-922E93D4C5CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-twzn-nsww_tt9y"><intent_id>1163541</intent_id><project_id>963446</project_id><text_data>Fringes:  Vacation $5.50, Assessment $1.30, Health Insurance $9.01, Pension $16.79, Training $2.08, Industry Improvement $.50</text_data><comment_date>2021-08-25T00:00:00</comment_date></row><row _id="row-cqpd_ax3y_va2v" _uuid="00000000-0000-0000-EC40-40A486B6235D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqpd_ax3y_va2v"><intent_id>612407</intent_id><project_id>727500</project_id><text_data>WE WILL BE AERATING (PUNCHING HOLES), SLICE SEEDING (OVERSEEDING EXISTING GRASS), AND TOP DRESSING (SPREADING A LAYER OF SAND). THESE PROCESSES HAVE BEEN APPROVED AS FALLING UNDER THE WA LANDSCAPING CODE. WE ARE IN OREGON, AND WE HAVE THE RECIPRICAL AGREEMENT WITH WASHINGTON FOR WORKERS COMP</text_data><comment_date>2014-01-16T00:00:00</comment_date></row><row _id="row-bb5g-ge5g_ds83" _uuid="00000000-0000-0000-F13D-3054D0EDB472" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bb5g-ge5g_ds83"><intent_id>971295</intent_id><project_id>878319</project_id><text_data>#1-We were contracted to replace the gas furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2019-04-12T00:00:00</comment_date></row><row _id="row-5pc6.9wiu~uejj" _uuid="00000000-0000-0000-E664-EA3DFCC29031" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5pc6.9wiu~uejj"><intent_id>1022029</intent_id><project_id>899668</project_id><text_data>FILED BY BILL MARTIN</text_data><comment_date>2019-11-15T00:00:00</comment_date></row><row _id="row-2ad4.xt5v-jmd5" _uuid="00000000-0000-0000-1307-C982B9D7F6FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ad4.xt5v-jmd5"><intent_id>783357</intent_id><project_id>798702</project_id><text_data>Job # 108808-001</text_data><comment_date>2016-08-18T00:00:00</comment_date></row><row _id="row-hjwh_c7hv.t74t" _uuid="00000000-0000-0000-974A-B6526C4AE455" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjwh_c7hv.t74t"><intent_id>753183</intent_id><project_id>788039</project_id><text_data>My industrial insurance account number is 464226-00 and when I submitted it the first time, I did not type the dash and the two zeros.  It would only let me type one.</text_data><comment_date>2016-03-31T00:00:00</comment_date></row><row _id="row-5nfs-35dq.96vm" _uuid="00000000-0000-0000-9684-6A4D9AAE0D85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5nfs-35dq.96vm"><intent_id>697031</intent_id><project_id>736650</project_id><text_data>RE:  WSU Ag Viticulture &amp; Fruit Quality Center Renovation 1.	What is the specific purpose of this awarding agency�s public works project? Construct warehouse for agricultural lab.  2.	Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?  No.  3.	Does this project entail the remodeling or new construction of a facility?  Yes, but not performed by Siemens Employees.  4.	If your firm is working upon a type of building system, what type of system is involved?  HVAC/refrigeration control system.  5.	5.  What specific tasks did your employees perform?  Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process.  While off-site, the BAU Technician create a computerized schematic of a particular building�s HVAC automations system.  That system is used to control the system�s functions after the mechanical commissioning process is complete.  Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer.  The BAU Technician typically sits in a central control room and manipulates the system using a computer program.   The program itself informs the Technician whether various components are functioning properly as they triggered.  If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified.  After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface.  Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.	What, if any, tools did your employees use in the performance of those tasks?  Laptop Computer.7.	If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks?  . No-None. 8.	Are you going to be hiring any subcontractors for this project?  .  No.</text_data><comment_date>2015-05-28T00:00:00</comment_date></row><row _id="row-b2gr-g92y-yg32" _uuid="00000000-0000-0000-E3DE-29344D5A9D19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b2gr-g92y-yg32"><intent_id>835038</intent_id><project_id>822156</project_id><text_data>Saybr Contractors Inc is prime.This is a job order contract for the state of Washington Dept of Enterprise Services.Contract 2017-180GWork order #9Project # 2017-415H (1-2)</text_data><comment_date>2017-05-18T00:00:00</comment_date></row><row _id="row-a2a6.ec6f-2dga" _uuid="00000000-0000-0000-95EB-57D1524A01DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a2a6.ec6f-2dga"><intent_id>776454</intent_id><project_id>790686</project_id><text_data>JCI Project Number 6N59-0229</text_data><comment_date>2016-07-21T00:00:00</comment_date></row><row _id="row-vxv9_2zst_774n" _uuid="00000000-0000-0000-FD30-E07DD2C837EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vxv9_2zst_774n"><intent_id>1037619</intent_id><project_id>878466</project_id><text_data>CABINET CONTRACT INTENT</text_data><comment_date>2020-02-11T00:00:00</comment_date></row><row _id="row-6i4y-6dfx.3hxq" _uuid="00000000-0000-0000-CDDB-624B6A11D4C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6i4y-6dfx.3hxq"><intent_id>1211896</intent_id><project_id>999795</project_id><text_data>480462</text_data><comment_date>2022-02-16T00:00:00</comment_date></row><row _id="row-ggrp_j6ux_jm53" _uuid="00000000-0000-0000-82A2-6861718767FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ggrp_j6ux_jm53"><intent_id>737484</intent_id><project_id>765776</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24CFR 965 101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2015-12-14T00:00:00</comment_date></row><row _id="row-qaq7.inih.vvu2" _uuid="00000000-0000-0000-6753-6AB6FAB52C0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qaq7.inih.vvu2"><intent_id>583481</intent_id><project_id>713140</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2013-07-25T00:00:00</comment_date></row><row _id="row-zqv3_zhak.nyqh" _uuid="00000000-0000-0000-F7B6-304BDB1E69A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zqv3_zhak.nyqh"><intent_id>699374</intent_id><project_id>764365</project_id><text_data>Other trucks - we will have a 2000 gal water truck on site</text_data><comment_date>2015-06-10T00:00:00</comment_date></row><row _id="row-iaub_qz3y.b7i9" _uuid="00000000-0000-0000-CE55-AC88E5D979AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iaub_qz3y.b7i9"><intent_id>1240523</intent_id><project_id>1017199</project_id><text_data>PO#829638</text_data><comment_date>2022-06-10T00:00:00</comment_date></row><row _id="row-a29n~z65v~byev" _uuid="00000000-0000-0000-BAF7-08C9E7E62D9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a29n~z65v~byev"><intent_id>1281741</intent_id><project_id>1016427</project_id><text_data>This is the correct contract price and that our pre-sales tax contract price with Ameresco, the prime contractor, is $1,261,186.74.</text_data><comment_date>2022-11-23T00:00:00</comment_date></row><row _id="row-sx9w_5smk-4wcq" _uuid="00000000-0000-0000-061F-61D093E6F1B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sx9w_5smk-4wcq"><intent_id>858068</intent_id><project_id>827869</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK BEST PARKING LOT CLEANING INDUSTRIAL INSURANCE ACCOUNT ID # 01250501</text_data><comment_date>2017-09-11T00:00:00</comment_date></row><row _id="row-e54z~x8u8~rx4n" _uuid="00000000-0000-0000-541B-AE9152050898" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e54z~x8u8~rx4n"><intent_id>999307</intent_id><project_id>890149</project_id><text_data>1. 1016 19TH AVE, LONGVIEW   2.369 GUN CLUB RD #14, WOODLAND   3.14 MORSE ST, RYDERWOOD  4.3981 ESTATE DR, LONGVIEW   5.1314 33RD AVE, LONGVIEW</text_data><comment_date>2019-08-13T00:00:00</comment_date></row><row _id="row-medf~qss3~9h2v" _uuid="00000000-0000-0000-113C-0F0C555B984F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-medf~qss3~9h2v"><intent_id>723207</intent_id><project_id>760363</project_id><text_data>Planting trees and shrubs, irrigation, seeded lawn areas.  No heavy equipment, no dump trucks.</text_data><comment_date>2015-09-28T00:00:00</comment_date></row><row _id="row-46pm-uhmn.qsmf" _uuid="00000000-0000-0000-C4C0-CA33C8E05A03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-46pm-uhmn.qsmf"><intent_id>1240301</intent_id><project_id>1017073</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on�call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2022-06-29T00:00:00</comment_date></row><row _id="row-6zqk_7c3i~za3x" _uuid="00000000-0000-0000-8774-7FF06D6B903F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6zqk_7c3i~za3x"><intent_id>690414</intent_id><project_id>759293</project_id><text_data>Owner may perform work a Glazier and or Carpenter on this project.</text_data><comment_date>2015-04-22T00:00:00</comment_date></row><row _id="row-nq2e.appi_tj7s" _uuid="00000000-0000-0000-6E4D-0B3D17167176" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nq2e.appi_tj7s"><intent_id>505535</intent_id><project_id>684964</project_id><text_data>Form filed by: Rachele Turnbull - murq235</text_data><comment_date>2012-03-27T00:00:00</comment_date></row><row _id="row-fpw3.tszk_u4fa" _uuid="00000000-0000-0000-69C1-61402EB860AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fpw3.tszk_u4fa"><intent_id>1211378</intent_id><project_id>999482</project_id><text_data>COB 134th trail mulch WO #99140Per Chris VandallMulching of existing trail by hand and with hand tools.</text_data><comment_date>2022-02-14T00:00:00</comment_date></row><row _id="row-bq3i_wy23~54hf" _uuid="00000000-0000-0000-F617-4B473A7A91E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bq3i_wy23~54hf"><intent_id>507431</intent_id><project_id>685814</project_id><text_data>Fringe: Pension .30  Med 2.83  Sick .37 HL .98  VC 1.48  BD .12</text_data><comment_date>2012-04-11T00:00:00</comment_date></row><row _id="row-cr85_2xd6.uerk" _uuid="00000000-0000-0000-A698-9F452A8CA920" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cr85_2xd6.uerk"><intent_id>1077363</intent_id><project_id>927776</project_id><text_data>Install customer supplied devices</text_data><comment_date>2020-08-03T00:00:00</comment_date></row><row _id="row-f8jh.cvg6_34mc" _uuid="00000000-0000-0000-5650-F037A793139F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f8jh.cvg6_34mc"><intent_id>743380</intent_id><project_id>783508</project_id><text_data>$1.51 NEBF, $8.60 Medical, $6.88 Pension, $1.75 Annuity, $.68 JATC</text_data><comment_date>2016-02-01T00:00:00</comment_date></row><row _id="row-gt52_9n5b_k8mp" _uuid="00000000-0000-0000-C070-E267522A62FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gt52_9n5b_k8mp"><intent_id>595329</intent_id><project_id>325127</project_id><text_data>Lydig Construction is filing on behalf of 3rd Generation Flooring due to Ceased Operations.</text_data><comment_date>2013-09-23T00:00:00</comment_date></row><row _id="row-7bs8.s32w~b6vi" _uuid="00000000-0000-0000-49B6-F8983CF3935A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7bs8.s32w~b6vi"><intent_id>686757</intent_id><project_id>734211</project_id><text_data>Install irrigation system to a maximum depth of 3� below finished grade. Trench for irrigation system to a maximum depth of 3� below finished grade.  Fertilize sod, amend soil.  Spread topsoil  Equipment to be used, bobcat under 75hp and misc. small hand tools.</text_data><comment_date>2015-04-01T00:00:00</comment_date></row><row _id="row-gi8z-wiqi~fu6n" _uuid="00000000-0000-0000-124F-F13E6C24D784" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gi8z-wiqi~fu6n"><intent_id>1113201</intent_id><project_id>942774</project_id><text_data>Single Family Dwelling</text_data><comment_date>2021-01-05T00:00:00</comment_date></row><row _id="row-ws9e.w7qp.gt8s" _uuid="00000000-0000-0000-D4C3-EBAD2FF3159A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ws9e.w7qp.gt8s"><intent_id>508533</intent_id><project_id>686279</project_id><text_data>PEO  DRIVING AND OEPRATING VACUUM TRUCKFRINGE IS 2.01 MEDICAL DENTAL .74 VACATION AND HOLIDAY</text_data><comment_date>2012-04-19T00:00:00</comment_date></row><row _id="row-kxfr_2vxq.i9f5" _uuid="00000000-0000-0000-60DD-EF57E70A74EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kxfr_2vxq.i9f5"><intent_id>468855</intent_id><project_id>667758</project_id><text_data>Kenworth, Freightliner, or Peterbilt semi trucks and trailers, dump trucks and trailers, or flatbed trucks.</text_data><comment_date>2011-08-25T00:00:00</comment_date></row><row _id="row-8cxv.b5ui.stgs" _uuid="00000000-0000-0000-43DE-711352BE7CBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8cxv.b5ui.stgs"><intent_id>1042174</intent_id><project_id>902618</project_id><text_data>20-F002</text_data><comment_date>2020-03-02T00:00:00</comment_date></row><row _id="row-hqrf~bn7z_bnha" _uuid="00000000-0000-0000-B87D-B468C487143F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hqrf~bn7z_bnha"><intent_id>746873</intent_id><project_id>781671</project_id><text_data>Roofer Fringe:Health &amp; Dental $2.64 &amp; Davis Bacon Pension Fund $2.58</text_data><comment_date>2016-02-16T00:00:00</comment_date></row><row _id="row-r9ti.na7m.ti76" _uuid="00000000-0000-0000-5333-6310BE7006F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r9ti.na7m.ti76"><intent_id>917118</intent_id><project_id>853056</project_id><text_data>0718046</text_data><comment_date>2018-07-11T00:00:00</comment_date></row><row _id="row-4m4t.vig6~panp" _uuid="00000000-0000-0000-2892-B2C1884B9916" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4m4t.vig6~panp"><intent_id>1258353</intent_id><project_id>1026664</project_id><text_data>This is a project for the City of Mukilteo in the County of Snohomish for Landscape Maintenance on Harbour Reach Drive. Work will include bed maintenance, plant care, weed removal, trash removal, leaf fall removal, pruning, hedgetrimming, and blowing of all hard surfaces for clean up.  Equipment to be used will consist of hand pruners, hedge trimmers, buckets, rakes, shovels, hoes, buckets, tarps, and backpack blowers for clean up.  This is year one of a multi-year contract.</text_data><comment_date>2022-08-16T00:00:00</comment_date></row><row _id="row-trfs~67jp.e94i" _uuid="00000000-0000-0000-04F8-BD1CE52EE2F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-trfs~67jp.e94i"><intent_id>898552</intent_id><project_id>848301</project_id><text_data>PCI PROJECT 18-04245FRINGE: HW $11.79, PEN $7.81, OTHER $1.99</text_data><comment_date>2018-04-13T00:00:00</comment_date></row><row _id="row-8f32-ch5e.yw7e" _uuid="00000000-0000-0000-9EE9-D78FC4BF2F6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8f32-ch5e.yw7e"><intent_id>684880</intent_id><project_id>753529</project_id><text_data>TOTAL FRINGE IS SENT TO A QUALIFIED PENSION PLAN.  PLAN IS 100% IMMEDIATELY VESTED AND PAID MONTHLY.</text_data><comment_date>2015-03-20T00:00:00</comment_date></row><row _id="row-ijvd~2qyy-fe9c" _uuid="00000000-0000-0000-F17F-2FBBAB6ABED2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijvd~2qyy-fe9c"><intent_id>629316</intent_id><project_id>734831</project_id><text_data>2116 S Inland Empire Wy #35 P.o395640 Amt2383.3836708 N findley Rd P.O. 395658 Amt 300.00</text_data><comment_date>2014-05-13T00:00:00</comment_date></row><row _id="row-d844-6q7i-rihr" _uuid="00000000-0000-0000-B8C5-DCC24EC60C02" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d844-6q7i-rihr"><intent_id>477478</intent_id><project_id>672311</project_id><text_data>OTHER TRUCKS CONSISTS OF AN OIL DISTRIBUTOR WHICH WILL BE USED ON THE PROJECT FOR SEAL COATING THE PAVEMENT WITH EMULSIFIED ASPHALT.</text_data><comment_date>2011-09-12T00:00:00</comment_date></row><row _id="row-5ca3.9xvu.236k" _uuid="00000000-0000-0000-2D96-3DADC2B719A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ca3.9xvu.236k"><intent_id>895420</intent_id><project_id>841196</project_id><text_data>Filed by Andy Vallejo</text_data><comment_date>2018-03-28T00:00:00</comment_date></row><row _id="row-7gdy-a89i_mmbd" _uuid="00000000-0000-0000-F612-21FF193C08C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7gdy-a89i_mmbd"><intent_id>1036061</intent_id><project_id>907068</project_id><text_data>PTI SO 152435</text_data><comment_date>2020-02-04T00:00:00</comment_date></row><row _id="row-ejh7_ifd2_p3py" _uuid="00000000-0000-0000-5C40-311FF986327E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ejh7_ifd2_p3py"><intent_id>677274</intent_id><project_id>751617</project_id><text_data>owner operator</text_data><comment_date>2015-01-30T00:00:00</comment_date></row><row _id="row-cz5y_vk7r.9r5h" _uuid="00000000-0000-0000-EF62-07EAA367D411" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cz5y_vk7r.9r5h"><intent_id>615734</intent_id><project_id>661800</project_id><text_data>Filed By: Tom L. Hekker</text_data><comment_date>2014-02-10T00:00:00</comment_date></row><row _id="row-fj63~k5v9~6we4" _uuid="00000000-0000-0000-89F1-3C7FBB3D0715" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fj63~k5v9~6we4"><intent_id>745287</intent_id><project_id>782754</project_id><text_data>Replace bath fan &amp; switchSingle residential home.</text_data><comment_date>2016-02-05T00:00:00</comment_date></row><row _id="row-644g~zc96_w7yj" _uuid="00000000-0000-0000-58B7-648078155368" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-644g~zc96_w7yj"><intent_id>739134</intent_id><project_id>781496</project_id><text_data>Scope of work:  delivery and installation of plant material using shovels, rakes, brooms, wheelbarrows, buckets and Ford F550 landscape truck.</text_data><comment_date>2015-12-23T00:00:00</comment_date></row><row _id="row-sw68-eqiz~hpqh" _uuid="00000000-0000-0000-A513-452CA08E7D39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sw68-eqiz~hpqh"><intent_id>925645</intent_id><project_id>854427</project_id><text_data>GU Job #18207Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2018-08-14T00:00:00</comment_date></row><row _id="row-4qzc.9bjj.3fbz" _uuid="00000000-0000-0000-CABF-22F3A72EFB42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4qzc.9bjj.3fbz"><intent_id>556295</intent_id><project_id>703655</project_id><text_data>Thank you for your help on this. I'm still learning exactly how prevailing wage works. So I need to pay prevailing wage plus the fringe? I just added them together and put them under wage but the fringe is still coming up. Thank you</text_data><comment_date>2013-03-01T00:00:00</comment_date></row><row _id="row-vbx8.s5t4-c8i7" _uuid="00000000-0000-0000-939D-0FEE28904CA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vbx8.s5t4-c8i7"><intent_id>729138</intent_id><project_id>775743</project_id><text_data>JOB# 22034</text_data><comment_date>2015-10-30T00:00:00</comment_date></row><row _id="row-w62m~3rfa.3si3" _uuid="00000000-0000-0000-5809-7126BF266708" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w62m~3rfa.3si3"><intent_id>659688</intent_id><project_id>746357</project_id><text_data>Class 8 truck pulling a 48' trailer.  The trailer is loaded with a trashrack.</text_data><comment_date>2014-10-13T00:00:00</comment_date></row><row _id="row-png9~ya58.9hje" _uuid="00000000-0000-0000-8339-2FD70635F533" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-png9~ya58.9hje"><intent_id>713956</intent_id><project_id>767806</project_id><text_data>Filed by Pavel Orekhov</text_data><comment_date>2015-08-12T00:00:00</comment_date></row><row _id="row-bfch~evcr-s72u" _uuid="00000000-0000-0000-A430-545CA8441BE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bfch~evcr-s72u"><intent_id>628063</intent_id><project_id>722400</project_id><text_data>1065F-38547</text_data><comment_date>2014-05-05T00:00:00</comment_date></row><row _id="row-zt27.j5ng-3wrz" _uuid="00000000-0000-0000-ABA2-CB964F8D9B18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zt27.j5ng-3wrz"><intent_id>1091234</intent_id><project_id>921985</project_id><text_data>order A76456 - Franklin PO 5914</text_data><comment_date>2020-09-25T00:00:00</comment_date></row><row _id="row-babt-f478~b2r5" _uuid="00000000-0000-0000-C7E1-28B37CF474EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-babt-f478~b2r5"><intent_id>1267031</intent_id><project_id>1031286</project_id><text_data>9901206</text_data><comment_date>2022-09-15T00:00:00</comment_date></row><row _id="row-m8h7.b28a_gt79" _uuid="00000000-0000-0000-84AB-BB9286ECCFD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8h7.b28a_gt79"><intent_id>858732</intent_id><project_id>831051</project_id><text_data>ALLIEDS JOB # 170822-0053.219</text_data><comment_date>2017-08-25T00:00:00</comment_date></row><row _id="row-mp46_ugcd~p4zq" _uuid="00000000-0000-0000-2338-900F385B0239" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mp46_ugcd~p4zq"><intent_id>1268818</intent_id><project_id>1019149</project_id><text_data>hydroseeding only</text_data><comment_date>2022-09-22T00:00:00</comment_date></row><row _id="row-xf5c-2v8w.8xd6" _uuid="00000000-0000-0000-D956-3D094F3CB20F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xf5c-2v8w.8xd6"><intent_id>824161</intent_id><project_id>814864</project_id><text_data>We are not sure of what the entire project entails. We however have been hired to core drill various sizes of HVAC openings as directed by customer. Our employee will be operating a concrete core drill and wet vac for slurry containment.</text_data><comment_date>2017-04-10T00:00:00</comment_date></row><row _id="row-w5uy~xht7~uhgt" _uuid="00000000-0000-0000-CED3-5EFC36A1509A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w5uy~xht7~uhgt"><intent_id>1088130</intent_id><project_id>921462</project_id><text_data>replaces Red Hawk intent 1070385</text_data><comment_date>2020-09-15T00:00:00</comment_date></row><row _id="row-eqx4~6jut~n4hv" _uuid="00000000-0000-0000-2102-218BDEDA562F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eqx4~6jut~n4hv"><intent_id>699168</intent_id><project_id>763703</project_id><text_data>#1 - We will be wiring up a mini-split system heat pump.#2 - The structure is a single family dwelling.#3 - Including any basement or garage, the dwelling has 1 story.#4 - No commercial use in the structure. No retail use in the structure. It is a permanent residence only. It is not a rehabilitation house. t is not transitional housing. It is not a communal dining facility. It is not a treatment services center. It is not a dormitory. It is not a counseling center. The rooms and/or beds in the structure are not rented separately. There are no other uses for the structure.#5 - The dwelling unit does have its own self-contained kitchen.#6 - The dwelling unit does have its own bathroom. #7 - There is no a community facility or manager�s office on site.#8 - No part of the structure is used by the public.</text_data><comment_date>2015-06-08T00:00:00</comment_date></row><row _id="row-a8z3.bh7j~7jgh" _uuid="00000000-0000-0000-4DEF-E3D58E0DB7E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a8z3.bh7j~7jgh"><intent_id>647519</intent_id><project_id>741682</project_id><text_data>Job Order Contract 1250220V</text_data><comment_date>2014-08-12T00:00:00</comment_date></row><row _id="row-d23n~82yu-3ik5" _uuid="00000000-0000-0000-9A42-719D29D7C965" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d23n~82yu-3ik5"><intent_id>611213</intent_id><project_id>726982</project_id><text_data>Journeyman Fringe: Total Benefit $8.62Health &amp; Welfare (medical, dental, vision, long-term and short-term disability) $5.31/hrVacation -- $1.50Holidays -- $1.22Basic Life &amp; Accidental Death/Dismemberment Insurance - $.03401k Plan employer match -- $.56</text_data><comment_date>2014-01-08T00:00:00</comment_date></row><row _id="row-cxbd-p2bx~kbwq" _uuid="00000000-0000-0000-0FE0-FE0B684172B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxbd-p2bx~kbwq"><intent_id>738496</intent_id><project_id>781169</project_id><text_data>(1)	Work Description: Removing old bath surround; prepping walls in make ready condition to prepare for the installation of new Tub Cove laminate surround. Install Tub Cove Laminate surround.(2)	Type of Structure: Structure is a single family residential apartment(3)	Structure stories or levels: Stories or levels varies. The large percentage of the structures are 4-plex family housing. Some buildings are 2 story duplex housing. (4)	Building Use: Buildings are used for student family housing(5)	Answer �yes� or �no�a.	No- commercial use in structureb.	No- retail use in structurec.	No- permanent residenced.	No- rehab housee.	No- transitional housingf.	No- communal dining facilityg.	No- treatment servicesh.	No- Assisted livingi.	No- dormitoriesj.	No- counselingk.	No- separate room/bed rentall.	No- other services/usesm.	Yes- Each unit has its own self-contained kitchenn.	Yes- Each dwelling unit has its own bathroomo.	Yes- there is a community facility or manager�s office on sitep.	No- No part of structures are used by members of the general public</text_data><comment_date>2015-12-18T00:00:00</comment_date></row><row _id="row-pd8g-uqae_u9wn" _uuid="00000000-0000-0000-AC19-56C2A863ECCE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pd8g-uqae_u9wn"><intent_id>600336</intent_id><project_id>722348</project_id><text_data>Roofer Fringe Breakdown: $4.66 per hr Davis Bacon Fund/ $2.21 Health &amp; Dental InsuranceSheet Metal Fringe Breakdown: $7.01 per hr Davis Bacon Fund/ $2.21 Health &amp; Dental Insurance</text_data><comment_date>2013-10-18T00:00:00</comment_date></row><row _id="row-bjwk.7nzn.fajz" _uuid="00000000-0000-0000-60D8-79A7238144E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjwk.7nzn.fajz"><intent_id>1177773</intent_id><project_id>880649</project_id><text_data>Job #69049</text_data><comment_date>2021-09-15T00:00:00</comment_date></row><row _id="row-iekf~x9eq.fnza" _uuid="00000000-0000-0000-91FC-71BDF296D456" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iekf~x9eq.fnza"><intent_id>496166</intent_id><project_id>673179</project_id><text_data>Form filed by: Ernest Jensen</text_data><comment_date>2012-01-09T00:00:00</comment_date></row><row _id="row-a7cm_itt5~75w2" _uuid="00000000-0000-0000-0BAC-2CC41652CCD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7cm_itt5~75w2"><intent_id>1194815</intent_id><project_id>988960</project_id><text_data>sr51091318</text_data><comment_date>2021-11-22T00:00:00</comment_date></row><row _id="row-92c5.k55h_isx8" _uuid="00000000-0000-0000-F757-7620F47B280C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-92c5.k55h_isx8"><intent_id>526554</intent_id><project_id>689965</project_id><text_data>Project is exempt from State Prevailing Wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2012-08-06T00:00:00</comment_date></row><row _id="row-fkwz.hi49_kq8z" _uuid="00000000-0000-0000-5811-225EFAE73218" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fkwz.hi49_kq8z"><intent_id>480500</intent_id><project_id>673648</project_id><text_data>Applying soil amendment, compost, 2&amp;quot; to 3&amp;quot; in depth,using combination of truck mounted Bark Blower and rubber tracked skid steer.  Applying native and wetland seed mixes and mulch using a truck mounted hydro seeder - Freightliner truck with 2,500 gallon Bowie Hydro seeder.</text_data><comment_date>2011-09-27T00:00:00</comment_date></row><row _id="row-es2z.v78q~nze2" _uuid="00000000-0000-0000-77BE-8335788FC75B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-es2z.v78q~nze2"><intent_id>557758</intent_id><project_id>705706</project_id><text_data>Filed By Earle Essex</text_data><comment_date>2013-02-26T00:00:00</comment_date></row><row _id="row-6s8z-62r8.qcmf" _uuid="00000000-0000-0000-AC3D-8FF3165A5FCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6s8z-62r8.qcmf"><intent_id>984287</intent_id><project_id>875371</project_id><text_data>street sweeper</text_data><comment_date>2019-06-12T00:00:00</comment_date></row><row _id="row-jz6s.rz9x.v2bx" _uuid="00000000-0000-0000-9512-45376F5DD4F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jz6s.rz9x.v2bx"><intent_id>781568</intent_id><project_id>775056</project_id><text_data>Fiber optic termination and testing</text_data><comment_date>2016-08-11T00:00:00</comment_date></row><row _id="row-azm7-qfdv.x6ym" _uuid="00000000-0000-0000-170E-C435B70337F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-azm7-qfdv.x6ym"><intent_id>512389</intent_id><project_id>687826</project_id><text_data>092012</text_data><comment_date>2012-05-17T00:00:00</comment_date></row><row _id="row-mfky.j49q-y22v" _uuid="00000000-0000-0000-5EC5-40D2A5713493" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mfky.j49q-y22v"><intent_id>1289460</intent_id><project_id>1044505</project_id><text_data>recable office spaceInside workElect Tech(06)</text_data><comment_date>2022-12-13T00:00:00</comment_date></row><row _id="row-izcf-garc-j7dx" _uuid="00000000-0000-0000-F7AA-7B955A9F1245" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-izcf-garc-j7dx"><intent_id>1368467</intent_id><project_id>1080617</project_id><text_data>dump truck drivers, owner operator,</text_data><comment_date>2023-09-30T00:00:00</comment_date></row><row _id="row-fk59.ksd5_x5hu" _uuid="00000000-0000-0000-79A8-570D0B6F0486" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fk59.ksd5_x5hu"><intent_id>849383</intent_id><project_id>827885</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications</text_data><comment_date>2017-07-21T00:00:00</comment_date></row><row _id="row-6m2j.hna6_ne7n" _uuid="00000000-0000-0000-6FE0-C93363F692B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6m2j.hna6_ne7n"><intent_id>1264434</intent_id><project_id>908026</project_id><text_data>ISUZU BOX VAN NPR 2009 14,000 GW</text_data><comment_date>2022-09-07T00:00:00</comment_date></row><row _id="row-upav_pi3q.ra97" _uuid="00000000-0000-0000-FBC9-6305811EBDBC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-upav_pi3q.ra97"><intent_id>801766</intent_id><project_id>771162</project_id><text_data>The following Note is being added per Elsa in the P wage unit at L &amp; I -prior to 10/8/2016 the intent will be filed under labor Ready Northwest, Inc our Industrial insurance number for that account is 58671101 and has not changed.  Nothing has changed for work done prior to 10/8 and should be filed under Labor Ready North West.After 10/8/2016 Labor ready and CLP Resources has merged and there new name is People Ready. We have set up a new account to enter all work done after 10/8 with the new industrial insurance number 58671101-11.  The UBI number for Labor Ready is 601898140, and for People Ready 601898135. The last correction set to us was to notify Cassandra Smith, we contacted her and she can not assist us, she directed us back to P wage Unit.</text_data><comment_date>2016-12-07T00:00:00</comment_date></row><row _id="row-zkim-8agz.9s9i" _uuid="00000000-0000-0000-FF50-F3817D248D79" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zkim-8agz.9s9i"><intent_id>590517</intent_id><project_id>715379</project_id><text_data>Correction has been completed for Hiring Contractor.</text_data><comment_date>2013-09-03T00:00:00</comment_date></row><row _id="row-4ixc.uqph-iix2" _uuid="00000000-0000-0000-E892-FFECB5A7D114" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ixc.uqph-iix2"><intent_id>1115768</intent_id><project_id>946893</project_id><text_data>1.- General weatherization /Repairs/ Energy upgrades.2.- Single home3.- 1 levels4.- a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-no.5.- yes6.- yes7.-no 8.- no</text_data><comment_date>2021-01-18T00:00:00</comment_date></row><row _id="row-3qc3_ybzp~yie4" _uuid="00000000-0000-0000-57C7-00AFDAF81D5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3qc3_ybzp~yie4"><intent_id>448581</intent_id><project_id>657605</project_id><text_data>Note on &amp;quot;Other Trucks &amp; General Labor&amp;quot;The truck being used is a 12 yard vactor 2100 sewer &amp; pipe cleaning vacuum truck.  The work is cleaning of sewer pipe for repairs &amp; rehabilitation.</text_data><comment_date>2011-06-09T00:00:00</comment_date></row><row _id="row-krgh_3q8q.769r" _uuid="00000000-0000-0000-CE3C-F0D7598B706A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-krgh_3q8q.769r"><intent_id>712149</intent_id><project_id>769096</project_id><text_data>Job # 103728-001</text_data><comment_date>2015-08-05T00:00:00</comment_date></row><row _id="row-wj7z.cu7c-xvn3" _uuid="00000000-0000-0000-57F6-BE954202D7F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wj7z.cu7c-xvn3"><intent_id>1034596</intent_id><project_id>903829</project_id><text_data>replace bath fanssingle family1 storya. no  b. no  c. yes  d. no  e. no  f. no  g. no  h. no  i. no  j. no  k. no  l. nayesyesnono</text_data><comment_date>2020-01-29T00:00:00</comment_date></row><row _id="row-5pyy-cqtt_in6j" _uuid="00000000-0000-0000-46B4-7934EE658491" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5pyy-cqtt_in6j"><intent_id>980015</intent_id><project_id>882070</project_id><text_data>#1 � The crews will be installing new ductless heat pumps, new wall heaters and new co detectors#2 � Four Plex#3 � 2 Stories#4 � (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No#5 � Yes#6 � Yes#7 � No#8 - No</text_data><comment_date>2019-05-23T00:00:00</comment_date></row><row _id="row-yz7k~i6n2-2dy3" _uuid="00000000-0000-0000-02F2-E374AA75E461" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yz7k~i6n2-2dy3"><intent_id>468269</intent_id><project_id>668011</project_id><text_data>Dump Truck Service Time &amp; Materials</text_data><comment_date>2011-07-26T00:00:00</comment_date></row><row _id="row-b67v_vtt5-xgs7" _uuid="00000000-0000-0000-0266-C569CFAAE445" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b67v_vtt5-xgs7"><intent_id>610996</intent_id><project_id>718235</project_id><text_data>Penhall Job # 221126</text_data><comment_date>2014-01-07T00:00:00</comment_date></row><row _id="row-b7hr_hmky~9369" _uuid="00000000-0000-0000-2CB9-1FC0D4283A2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b7hr_hmky~9369"><intent_id>464999</intent_id><project_id>668015</project_id><text_data>Please provide the specific type, size and purpose of the truck operated by the �Truck Driver/Other Trucks� classification listed: Ford E350 Box Van with Lift Gate. Operator transported materials from our warehouse to the jobsite.</text_data><comment_date>2011-07-11T00:00:00</comment_date></row><row _id="row-x828.eu6j~ppdu" _uuid="00000000-0000-0000-86FA-6509C7F61AC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x828.eu6j~ppdu"><intent_id>497644</intent_id><project_id>681671</project_id><text_data>See note of 05/11/2012.  These figures are correct.</text_data><comment_date>2012-07-12T00:00:00</comment_date></row><row _id="row-ev3b~jy4g~ufbf" _uuid="00000000-0000-0000-7F58-0CB24BCCE860" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ev3b~jy4g~ufbf"><intent_id>472050</intent_id><project_id>669328</project_id><text_data>I Clay Heck as owner of summit equipment and construction will be driving my Dump Truck on this project as owner operator.</text_data><comment_date>2011-08-30T00:00:00</comment_date></row><row _id="row-iubq~wxqh-uaa6" _uuid="00000000-0000-0000-30E7-35C69842AE6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iubq~wxqh-uaa6"><intent_id>771784</intent_id><project_id>793088</project_id><text_data>HIRED BY SUB MASON DESIGN AND CONSTRUCTION</text_data><comment_date>2016-06-29T00:00:00</comment_date></row><row _id="row-68m8_y324.wt3g" _uuid="00000000-0000-0000-444B-9345BCBDFB62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-68m8_y324.wt3g"><intent_id>1123408</intent_id><project_id>951172</project_id><text_data>9861085</text_data><comment_date>2021-02-18T00:00:00</comment_date></row><row _id="row-xqy3~8vyw.w74p" _uuid="00000000-0000-0000-C141-10ED8632B149" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xqy3~8vyw.w74p"><intent_id>1171482</intent_id><project_id>940195</project_id><text_data>Equipment Operator installs underground conduit using a directional drill and the laborers track the location and depth of the drill head for accuracy. The laborer also uses a vac truck to locate existing utilities to avoid hitting them with the drill.</text_data><comment_date>2021-08-23T00:00:00</comment_date></row><row _id="row-8zvj-fffq.7a95" _uuid="00000000-0000-0000-85BE-EBD634BB4A86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zvj-fffq.7a95"><intent_id>518344</intent_id><project_id>688043</project_id><text_data>Filed by: Sue Johnson</text_data><comment_date>2012-06-22T00:00:00</comment_date></row><row _id="row-fij2_ajsn_qb2f" _uuid="00000000-0000-0000-FA18-F2DEC32A8ECA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fij2_ajsn_qb2f"><intent_id>889566</intent_id><project_id>844306</project_id><text_data>Elect Tech(06)TelephoneCCTVLAN(Local Area Network)Computerinside and outside work</text_data><comment_date>2018-02-22T00:00:00</comment_date></row><row _id="row-d7yi.bqyg-h7a3" _uuid="00000000-0000-0000-4E18-3FD00C449932" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d7yi.bqyg-h7a3"><intent_id>1137193</intent_id><project_id>958915</project_id><text_data>Hired Shold</text_data><comment_date>2021-04-20T00:00:00</comment_date></row><row _id="row-7gt6~iivv_nkhn" _uuid="00000000-0000-0000-58D9-C8B72ACAD649" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7gt6~iivv_nkhn"><intent_id>900640</intent_id><project_id>849180</project_id><text_data>We are using a subcontractor - I am unable to access Addendum B to enter the information.</text_data><comment_date>2018-05-31T00:00:00</comment_date></row><row _id="row-vfye_gdsu-t2ib" _uuid="00000000-0000-0000-9284-65B21AE7EEE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfye_gdsu-t2ib"><intent_id>844331</intent_id><project_id>825004</project_id><text_data>Our Contractor&amp;#39;s License was current however, they didn&amp;#39;t have a current copy of our General Liability insurance certificate. I have since provided it to them and they informed me the license has been reinstated now.</text_data><comment_date>2017-07-30T00:00:00</comment_date></row><row _id="row-ijxf_3edh.gyyz" _uuid="00000000-0000-0000-51A9-240B6AB0C768" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijxf_3edh.gyyz"><intent_id>878266</intent_id><project_id>781506</project_id><text_data>Filed by Lynne A. Cobb</text_data><comment_date>2017-12-08T00:00:00</comment_date></row><row _id="row-yzwc~pze7-ztj4" _uuid="00000000-0000-0000-F89E-59E8EF70B6A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yzwc~pze7-ztj4"><intent_id>585595</intent_id><project_id>712178</project_id><text_data>Water Truck4300 Gallon Water TankGVW 54,000</text_data><comment_date>2013-08-13T00:00:00</comment_date></row><row _id="row-6qqj~vxi3-8c5z" _uuid="00000000-0000-0000-13AE-7359DD0AB42F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6qqj~vxi3-8c5z"><intent_id>1141679</intent_id><project_id>960744</project_id><text_data>other trucks include 4000 gal water truck for dust control</text_data><comment_date>2021-05-04T00:00:00</comment_date></row><row _id="row-m6nv.ns52-y7f6" _uuid="00000000-0000-0000-0415-9090F76530C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6nv.ns52-y7f6"><intent_id>529473</intent_id><project_id>694203</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/ocupations:  Laborer/Fence Erector - Wage $16.66 / Fringe $6.66</text_data><comment_date>2012-08-20T00:00:00</comment_date></row><row _id="row-etu4_xdjb.ekex" _uuid="00000000-0000-0000-0EE3-1043CF1B9181" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-etu4_xdjb.ekex"><intent_id>913385</intent_id><project_id>848271</project_id><text_data>Telecom Tech-AV cabling/Clock speaker cabling/ install data racks connectivity devices.Fringe to be paid in cash on the check</text_data><comment_date>2018-06-22T00:00:00</comment_date></row><row _id="row-rw3x_hu4d-ejb2" _uuid="00000000-0000-0000-D8CC-B160C0216E4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rw3x_hu4d-ejb2"><intent_id>926362</intent_id><project_id>858994</project_id><text_data>Blythe w/o #86200^</text_data><comment_date>2018-08-16T00:00:00</comment_date></row><row _id="row-egcu~wbmj.rxqk" _uuid="00000000-0000-0000-AC76-6F1953DEE3CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-egcu~wbmj.rxqk"><intent_id>993251</intent_id><project_id>887724</project_id><text_data>Customer provided parts and electrician on site.</text_data><comment_date>2019-07-19T00:00:00</comment_date></row><row _id="row-ckkm~tbsh~35rk" _uuid="00000000-0000-0000-3A21-2E952CAD4659" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ckkm~tbsh~35rk"><intent_id>973916</intent_id><project_id>879472</project_id><text_data>1) Install ductless heat pump 2) Yes 3) One 4) a. No b. No c. Yes d. No e. No f. No g. No h. No i. No j. No k. No l. No 5) Yes 6) Yes 7) No 8) No</text_data><comment_date>2019-04-25T00:00:00</comment_date></row><row _id="row-auui-haaa_urbc" _uuid="00000000-0000-0000-7185-50B0E24D11A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-auui-haaa_urbc"><intent_id>873493</intent_id><project_id>830610</project_id><text_data>Wage 41.52 Cash Fringe</text_data><comment_date>2017-11-07T00:00:00</comment_date></row><row _id="row-hycb~hm97~rttp" _uuid="00000000-0000-0000-F250-F73247A5AFCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hycb~hm97~rttp"><intent_id>866835</intent_id><project_id>834205</project_id><text_data>**10/4/2017**LESLEY HOLMES1)INSTALL NEW HEAT PUMP2)SINGLE FAMILY3)1STORY WITH BASEMENT4)a-no b-no c-yes d-no e-no f-no g-no h-no I-no j-no k-none5)YES6)YES7)NO8)NO</text_data><comment_date>2017-10-04T00:00:00</comment_date></row><row _id="row-ca6p~c45i.h3pk" _uuid="00000000-0000-0000-88E7-83053253D128" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ca6p~c45i.h3pk"><intent_id>1100118</intent_id><project_id>885588</project_id><text_data>303287</text_data><comment_date>2020-10-30T00:00:00</comment_date></row><row _id="row-3rr4-gwgj~yn9q" _uuid="00000000-0000-0000-AF08-7E9084D118C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3rr4-gwgj~yn9q"><intent_id>640980</intent_id><project_id>739304</project_id><text_data>Higher paid lineperson is the foreman</text_data><comment_date>2014-07-15T00:00:00</comment_date></row><row _id="row-giay_5k9b.haqg" _uuid="00000000-0000-0000-E845-B8941F4E6088" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-giay_5k9b.haqg"><intent_id>770125</intent_id><project_id>795149</project_id><text_data>WO# 35-05966$280.73Konni Maier3557 Cedarville Road #22Bellingham, WA 98226</text_data><comment_date>2016-06-22T00:00:00</comment_date></row><row _id="row-x3he_b6wp.2p5v" _uuid="00000000-0000-0000-AFF5-2D851C982DB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3he_b6wp.2p5v"><intent_id>754988</intent_id><project_id>788862</project_id><text_data>Filed by Matthew Beilstein</text_data><comment_date>2016-04-05T00:00:00</comment_date></row><row _id="row-syin~rwzu-kave" _uuid="00000000-0000-0000-5B9D-A539881D261A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-syin~rwzu-kave"><intent_id>662368</intent_id><project_id>747460</project_id><text_data>#1 Bath fan replacement &amp; J-boxes. #2 Single Family dwelling #3 1 story BLDG #4(a)no (b)no (c)yes (d)no (e)no (f)no (g)no (h)no (i)no (j)no(k)no #5 1 family dwelling kitchen #6 1 family dwelling bathroom #7 no places #8 no public use.</text_data><comment_date>2014-10-27T00:00:00</comment_date></row><row _id="row-pqcq.wbg7.vy7s" _uuid="00000000-0000-0000-00DB-2B3C5D0CA124" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqcq.wbg7.vy7s"><intent_id>1003127</intent_id><project_id>891626</project_id><text_data>38134</text_data><comment_date>2019-08-28T00:00:00</comment_date></row><row _id="row-as9u-h3e4.vdau" _uuid="00000000-0000-0000-9CAC-6AEEC8E53116" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-as9u-h3e4.vdau"><intent_id>1215517</intent_id><project_id>1002094</project_id><text_data>Invoice 910006-00 / Labor SRO 1915437</text_data><comment_date>2022-03-04T00:00:00</comment_date></row><row _id="row-8jwz-r3s2-4wai" _uuid="00000000-0000-0000-78CD-DE6196872E97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8jwz-r3s2-4wai"><intent_id>905671</intent_id><project_id>851158</project_id><text_data>2nd Quarter Quarterly includes a 27 point inspection and transfer test. Employees drive either a 2500 or 3500 Chevy Silverado to and from the job site.</text_data><comment_date>2018-05-18T00:00:00</comment_date></row><row _id="row-xjzw-rfti~29cy" _uuid="00000000-0000-0000-CB77-402152EA2BBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xjzw-rfti~29cy"><intent_id>720873</intent_id><project_id>772459</project_id><text_data>Job # 104162-001</text_data><comment_date>2015-09-16T00:00:00</comment_date></row><row _id="row-zhca_i6it-2wiz" _uuid="00000000-0000-0000-A922-7C4A367A06C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhca_i6it-2wiz"><intent_id>587331</intent_id><project_id>717620</project_id><text_data>Form filed by: Christiane Petrie</text_data><comment_date>2013-08-13T00:00:00</comment_date></row><row _id="row-tzpf~nxm3.xe7g" _uuid="00000000-0000-0000-739C-DF58D1FD8981" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzpf~nxm3.xe7g"><intent_id>714748</intent_id><project_id>770064</project_id><text_data>Employees are covered by related company D-industries WA UBI 578 044 459 L&amp;I 897,864-05 Contractor Reg# GCASE6913MB</text_data><comment_date>2015-08-18T00:00:00</comment_date></row><row _id="row-m2z8_cuzq-dirs" _uuid="00000000-0000-0000-3AE3-8C579B496C29" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2z8_cuzq-dirs"><intent_id>1046172</intent_id><project_id>912872</project_id><comment_date>2020-03-18T00:00:00</comment_date></row><row _id="row-a7fc_xrhc~tvk4" _uuid="00000000-0000-0000-6D52-4412589CB12D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7fc_xrhc~tvk4"><intent_id>1096321</intent_id><project_id>936477</project_id><text_data>Work performed by the Telecommunication Technicians is troubleshooting Cat6 cables that were not operating correctly. POWERCOM job# 925899</text_data><comment_date>2020-10-15T00:00:00</comment_date></row><row _id="row-q4rn~idhd_b3az" _uuid="00000000-0000-0000-29B3-F70FBE7FD176" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q4rn~idhd_b3az"><intent_id>1151546</intent_id><project_id>956709</project_id><text_data>We are a subcontractor for Pacific Earth Works, WBE. They have been hired to improve the athletic surfaces at Cedar Heights Middle School. We are supplying and installing synthetic track surface on the long jump runway.   Once we make sure the track surface is safe, we will spray paint lines for track events. Our crew uses tools like a power washer, shovels, rakes, brooks and wheelbarrows to move the rubber. We also use scissors and tape for masking areas to keep the other surfaces clean.</text_data><comment_date>2021-06-10T00:00:00</comment_date></row><row _id="row-phtd.jht4_wxhd" _uuid="00000000-0000-0000-35D8-36173A8D69DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-phtd.jht4_wxhd"><intent_id>989628</intent_id><project_id>879693</project_id><text_data>Other Truck - Water TruckOther Truck Lowboy Heavy Duty Trailer</text_data><comment_date>2019-07-03T00:00:00</comment_date></row><row _id="row-zdjf_6jrs~iadg" _uuid="00000000-0000-0000-7A89-F89993FE3057" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdjf_6jrs~iadg"><intent_id>886517</intent_id><project_id>842888</project_id><text_data>From: Ziegert, Charles O (LNI) Sent: Tuesday, April 24, 2018 3:54 PMTo: &amp;#39;office@ghbwindows.com&amp;#39; &amp;lt;office@ghbwindows.com&amp;gt;Subject: Intent 886517 On-Call Good afternoon,On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on--call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.aspThank you,Chuck ZiegertIndustrial Relations AgentCharles.Ziegert@lni.wa.govPrevailing WageDept of Labor and IndustriesPhone 360 902-4538Prevailing Wage 360 902-5335Prevailing Wage Information:http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp</text_data><comment_date>2018-04-24T00:00:00</comment_date></row><row _id="row-c5yy~iyyv-9efw" _uuid="00000000-0000-0000-49C9-4E1BC2D2C1D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c5yy~iyyv-9efw"><intent_id>1140437</intent_id><project_id>953469</project_id><text_data>THE OTHER TRUCK WILL BE AN OIL DISTRIBUTOR TRUCK.</text_data><comment_date>2021-05-10T00:00:00</comment_date></row><row _id="row-kayc~njai_aafe" _uuid="00000000-0000-0000-C29E-67392AA096D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kayc~njai_aafe"><intent_id>982245</intent_id><project_id>871848</project_id><text_data>We are responsible for the installation and providing the equipment of commercial kitchen equipment.Our installers will work on sheet metal and will set in place equipment and also clean up the work site. They will clock in and out as they perform different tasks.. We pay thier hourly rate by the task they are performing.</text_data><comment_date>2019-06-04T00:00:00</comment_date></row><row _id="row-wyy4-69f5.7d86" _uuid="00000000-0000-0000-CCF3-E43E9424820E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wyy4-69f5.7d86"><intent_id>455277</intent_id><project_id>665849</project_id><text_data>Other truck is our water truck</text_data><comment_date>2011-07-05T00:00:00</comment_date></row><row _id="row-eeps_jm57~hnyd" _uuid="00000000-0000-0000-3783-51FDE13A4411" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eeps_jm57~hnyd"><intent_id>1271027</intent_id><project_id>1033422</project_id><text_data>#1construct wheelchair ramp, #2 single family dwelling, #3 - 2, #4 - (c) permanent residence, #5 - yes, #6 - yes, #7 - no, #8 - no</text_data><comment_date>2022-09-30T00:00:00</comment_date></row><row _id="row-nfib~j2c3-w7aw" _uuid="00000000-0000-0000-835B-16FD59EB1935" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nfib~j2c3-w7aw"><intent_id>883576</intent_id><project_id>841539</project_id><text_data>Kcda</text_data><comment_date>2018-01-16T00:00:00</comment_date></row><row _id="row-ccfk~fxqp.i3kb" _uuid="00000000-0000-0000-EE8D-EC84EE5329FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ccfk~fxqp.i3kb"><intent_id>1509815</intent_id><project_id>1170611</project_id><text_data>253917-MONTHLY SITE MEETING</text_data><comment_date>2025-02-13T00:00:00</comment_date></row><row _id="row-ufxv_9pu6~yuks" _uuid="00000000-0000-0000-7B87-379AF25AEAC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ufxv_9pu6~yuks"><intent_id>982318</intent_id><project_id>883100</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2019-06-05T00:00:00</comment_date></row><row _id="row-6h6c_34mw.5p9u" _uuid="00000000-0000-0000-893F-EFB94C6E25A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6h6c_34mw.5p9u"><intent_id>556878</intent_id><project_id>696903</project_id><text_data>Fringe Benefits:$7.55 Health &amp; Security$7.65 Pension$ .70 Apprentice/Training</text_data><comment_date>2013-03-06T00:00:00</comment_date></row><row _id="row-uw24_t3zp~twf9" _uuid="00000000-0000-0000-0C1F-DDDDC8432F72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uw24_t3zp~twf9"><intent_id>743456</intent_id><project_id>745776</project_id><text_data>Filed by Jeanne AndersonProject is exempt from state prevailing wage requirements based on The Housing Act of 1937 and CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2016-01-26T00:00:00</comment_date></row><row _id="row-m8jv.gs8c_kyng" _uuid="00000000-0000-0000-2103-1D2D239A8E1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8jv.gs8c_kyng"><intent_id>1240464</intent_id><project_id>988789</project_id><text_data>truck other is a flatbed non cdl under 26K GVW to haul seeder n seedlandcpe labor is planting grass seed for lawns</text_data><comment_date>2022-06-10T00:00:00</comment_date></row><row _id="row-gy3c.gy8j-dhpz" _uuid="00000000-0000-0000-17EF-5439F8B354ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gy3c.gy8j-dhpz"><intent_id>621014</intent_id><project_id>730610</project_id><text_data>Fringe Benefits for the $16.65----   $15.63 contribution to retirement plan, $0.64 to vacation, $0.38 to holiday.Fringe Benefits for the $9.85 ----  $9.24 contribution to retirement plan, $0.38 to vacation, $0.23 to holiday.</text_data><comment_date>2014-03-28T00:00:00</comment_date></row><row _id="row-chdg~s7h3~7bsx" _uuid="00000000-0000-0000-B328-47145190CEFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-chdg~s7h3~7bsx"><intent_id>1163717</intent_id><project_id>962433</project_id><text_data>Telecommunications Cabling, voice/ data and fiber optic cabling for the schools internal cabling system. Telephone cabling. Fiber optic cabling. All cabling inside building structure.</text_data><comment_date>2021-07-27T00:00:00</comment_date></row><row _id="row-xi85_su5j-v3tu" _uuid="00000000-0000-0000-6F08-4ECAFD3C1C51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xi85_su5j-v3tu"><intent_id>856051</intent_id><project_id>830421</project_id><text_data>1. Insulation, windows, mechanical ventilation, dry wall, air sealing, paint2. Mobile3.14.Residentiala. Nob. No c. Yesd. No e. No f. Nog. Noh. NoI. Noj. Nok. Nol. No5. Yes6. Yes7. No8. No</text_data><comment_date>2017-08-19T00:00:00</comment_date></row><row _id="row-vfsm-vsx2~b9dm" _uuid="00000000-0000-0000-6B9E-03C328E5C6E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfsm-vsx2~b9dm"><intent_id>977536</intent_id><project_id>881000</project_id><text_data>Kruick - 6295 Oak Ct</text_data><comment_date>2019-05-13T00:00:00</comment_date></row><row _id="row-8trk~kpjy-g2xu" _uuid="00000000-0000-0000-3491-DDFCCF572EB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8trk~kpjy-g2xu"><intent_id>575734</intent_id><project_id>713451</project_id><text_data>Filed by Michael Hummel.State of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- Kent SD Kent Meridian East Wing AnnexPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you Claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the purpose of this project?Update the security alarm system and access controls for all Kent School District schools and administrative building.2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)]No.3.) Does this project entail the remodeling or new construction of a facility?No. 4.) If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.Burglar alarm system.5.) What specific tasks will your employees use in the performance of those tasks?Siemens� SES Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the SES Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The SES Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the SES Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, SES Technicians do not use trade tools, such as drills or wrenches.  6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.) Are you going to be hiring any subcontractors for this project?Yes. To expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves.</text_data><comment_date>2013-06-17T00:00:00</comment_date></row><row _id="row-4vh9.tngd~9avu" _uuid="00000000-0000-0000-134F-FC72E474A1E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4vh9.tngd~9avu"><intent_id>481913</intent_id><project_id>675714</project_id><text_data>$5.07 NW Pension$1.52 National Pension$7.50 Health $.17 International Training Institute ($.12) NEMI ($.03) SMOHI ($.02)$.66 Apprenticeship Fund$.33 Industry Fund$1.00 Organizational Trust Fund$.68 Northwest Supplemental Plan$.07 SNAP Clean Card</text_data><comment_date>2011-10-05T00:00:00</comment_date></row><row _id="row-nkxs-my9h_6sx5" _uuid="00000000-0000-0000-B7D8-41FC5F749AB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nkxs-my9h_6sx5"><intent_id>1212730</intent_id><project_id>1000295</project_id><text_data>Kachemak Contractors employee will only be doing general labor or carpentry based on on-call maintenance/repairs.  All other work will be preformed by a subcontractor.</text_data><comment_date>2022-02-22T00:00:00</comment_date></row><row _id="row-bzjv~snz9_w7qw" _uuid="00000000-0000-0000-434F-2775E55DF1C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bzjv~snz9_w7qw"><intent_id>744119</intent_id><project_id>782659</project_id><text_data>Our duties for this project were to bring playground material in our truck to the facility where everything was marked and ready for our guy (landscape construction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used.</text_data><comment_date>2016-01-29T00:00:00</comment_date></row><row _id="row-pkf9_tnrv~rtmf" _uuid="00000000-0000-0000-5998-5F239E579E64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pkf9_tnrv~rtmf"><intent_id>1359563</intent_id><project_id>1084962</project_id><text_data>1.- General weatherization /Repairs/ Energy upgrades.2.- Single home3.- 2 levels4.- a-no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-no.5.- yes6.- yes7.- no 8.- no</text_data><comment_date>2023-08-30T00:00:00</comment_date></row><row _id="row-75a9.pad6_s2vw" _uuid="00000000-0000-0000-D28B-C3EC9C3B55EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-75a9.pad6_s2vw"><intent_id>1045793</intent_id><project_id>911010</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborers Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2020-03-17T00:00:00</comment_date></row><row _id="row-2dyg.b2tq-pfcy" _uuid="00000000-0000-0000-D769-D2ADECF77E38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2dyg.b2tq-pfcy"><intent_id>646798</intent_id><project_id>741415</project_id><text_data>Per correction notice received 8/11/14 - Describe whole project: &amp;quot;Furnish and install labor and materials to repair the leaking Burnham boiler in the Fine Arts Building at Ferndale High School&amp;quot;</text_data><comment_date>2014-08-11T00:00:00</comment_date></row><row _id="row-s9zq.udnm-9t8w" _uuid="00000000-0000-0000-2958-6C6C527C369D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s9zq.udnm-9t8w"><intent_id>1231403</intent_id><project_id>1011892</project_id><text_data>other trucks include 4000 gal water truck for dust control</text_data><comment_date>2022-05-05T00:00:00</comment_date></row><row _id="row-ssat_atsc.6f38" _uuid="00000000-0000-0000-4660-9746DC6BC3ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ssat_atsc.6f38"><intent_id>767795</intent_id><project_id>794254</project_id><text_data>1. Install septic system.  2. single family.  3. one story.  4a. No.  4b. No  4c.  Yes.  4d.  No.  4e.  No.  4f. No.  4g. No.  4h. No.  4i. No.  4j. No.  5. Yes.  6. Yes.  7. No.  8. No</text_data><comment_date>2016-06-13T00:00:00</comment_date></row><row _id="row-gpsf~ddsq_2zmv" _uuid="00000000-0000-0000-3E87-780D4063095B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gpsf~ddsq_2zmv"><intent_id>907983</intent_id><project_id>849313</project_id><text_data>Bath fan and switch Single residential home.</text_data><comment_date>2018-05-31T00:00:00</comment_date></row><row _id="row-xisa~8h8m.4vyr" _uuid="00000000-0000-0000-600D-FD86B2847EE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xisa~8h8m.4vyr"><intent_id>1131558</intent_id><project_id>955760</project_id><text_data>Contract 37158, Customer 201368//1/2020 thru 7/31/2021/refiling intent for new license #</text_data><comment_date>2021-03-25T00:00:00</comment_date></row><row _id="row-mbx3-m3w4_mzmr" _uuid="00000000-0000-0000-A62A-AF5CE1F30F19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbx3-m3w4_mzmr"><intent_id>823601</intent_id><project_id>816873</project_id><text_data>MMFS Job#73176225</text_data><comment_date>2017-03-30T00:00:00</comment_date></row><row _id="row-cey7~ti62_s9bk" _uuid="00000000-0000-0000-A159-AFF2B89829F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cey7~ti62_s9bk"><intent_id>865019</intent_id><project_id>833463</project_id><text_data>KCDA</text_data><comment_date>2017-09-26T00:00:00</comment_date></row><row _id="row-c9cp_nwqm.zjn3" _uuid="00000000-0000-0000-657D-2CC7B1D9D481" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9cp_nwqm.zjn3"><intent_id>752422</intent_id><project_id>787702</project_id><text_data>Patricia Barth is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The electricians will be installing new bathroom fans. This job meets the residential job requirements.</text_data><comment_date>2016-03-21T00:00:00</comment_date></row><row _id="row-hh4v.pksp.nygh" _uuid="00000000-0000-0000-ECAF-1D6AAFE6443F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hh4v.pksp.nygh"><intent_id>686118</intent_id><project_id>754572</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2015-03-27T00:00:00</comment_date></row><row _id="row-xaf7_ab7w_9i2c" _uuid="00000000-0000-0000-AFA0-21B87F8D2925" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xaf7_ab7w_9i2c"><intent_id>919820</intent_id><project_id>856539</project_id><text_data>Irrigation repair - install controller and solonoid</text_data><comment_date>2018-07-20T00:00:00</comment_date></row><row _id="row-7mj9-dqie~rj9w" _uuid="00000000-0000-0000-1FBC-91E91CC5C5A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7mj9-dqie~rj9w"><intent_id>991169</intent_id><project_id>849878</project_id><text_data>Inside workElect tech(06)DAS cabling and equipment</text_data><comment_date>2019-07-11T00:00:00</comment_date></row><row _id="row-8he4.eyvu_9wny" _uuid="00000000-0000-0000-97E6-7BED406257D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8he4.eyvu_9wny"><intent_id>719455</intent_id><project_id>771136</project_id><text_data>Number of employees was not constant due to scale-up to a max of 9 then scale-down to 3-4 as operations were concluded</text_data><comment_date>2015-09-08T00:00:00</comment_date></row><row _id="row-bz7r~p7fq~62xf" _uuid="00000000-0000-0000-F531-A95E34B24174" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bz7r~p7fq~62xf"><intent_id>1181327</intent_id><project_id>981285</project_id><text_data>General labor consists of site protection, cleanup and help move material</text_data><comment_date>2021-10-06T00:00:00</comment_date></row><row _id="row-dzmr~he23-fgge" _uuid="00000000-0000-0000-DA19-85F7A6BDAE9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dzmr~he23-fgge"><intent_id>656715</intent_id><project_id>741841</project_id><text_data>Form filed by: Ashley SellandHealth $8.35 / Pension $9.66 / Training $0.68 - Total $18.69Job: 42520</text_data><comment_date>2014-09-24T00:00:00</comment_date></row><row _id="row-52mu_u2sa~wntq" _uuid="00000000-0000-0000-9815-D64CC2CE4884" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-52mu_u2sa~wntq"><intent_id>867958</intent_id><project_id>834658</project_id><text_data>WO# 16039</text_data><comment_date>2017-10-09T00:00:00</comment_date></row><row _id="row-k9mx.vuba.tvab" _uuid="00000000-0000-0000-7526-C4E1B328335B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k9mx.vuba.tvab"><intent_id>904726</intent_id><project_id>844929</project_id><text_data>� Installation of Valcom Engineered Solutions IP Intercom Clock System per section 275123 and telecom floor plans. � Installation of Valcom analog speakers and related hardware.� IP Intercom Clock and Analog speakers will be integrated into a single broadcast platform.</text_data><comment_date>2018-05-15T00:00:00</comment_date></row><row _id="row-ct7i_drdt.6mth" _uuid="00000000-0000-0000-3FF6-66FDA2E1E948" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ct7i_drdt.6mth"><intent_id>801551</intent_id><project_id>807291</project_id><text_data>This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2016-11-17T00:00:00</comment_date></row><row _id="row-eugc_if9k~ibuk" _uuid="00000000-0000-0000-7E60-347179C7C1B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eugc_if9k~ibuk"><intent_id>507715</intent_id><project_id>685939</project_id><text_data>3124188 BOB BRACCO  CASE # 11-51995</text_data><comment_date>2012-04-13T00:00:00</comment_date></row><row _id="row-cjnv.5xqv~g5vz" _uuid="00000000-0000-0000-4E62-C27D808D3C60" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cjnv.5xqv~g5vz"><intent_id>795209</intent_id><project_id>804669</project_id><text_data>From: Aidan Sievertson [mailto:Aidan@phc-construction.com] Sent: Friday, September 22, 2017 9:30 AMTo: Dressel, Bonnie (LNI) &amp;lt;drec235@LNI.WA.GOV&amp;gt;Subject: RE: Overtime Pay &amp; Intent QuestionsThank you.We need to add the work class for �Painters,� per number 4 of the WAC for application of waterproofing materials. Thank you! AIDAN SIEVERTSON PHC CONSTRUCTION710 John Nelson Lane NEBainbridge Island, WA., 98110 d. 206.780.7437c: 206.861.5323aidan@phc-construction.com</text_data><comment_date>2017-09-22T00:00:00</comment_date></row><row _id="row-vk88~367i-5wrm" _uuid="00000000-0000-0000-D25B-470E6A8CA68F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vk88~367i-5wrm"><intent_id>1249641</intent_id><project_id>1022231</project_id><text_data>JCI Project # 650244489 KC Downtown Public Health DSC - Bryan Reimer, PC - Bradford Adragna, Sales</text_data><comment_date>2022-07-16T00:00:00</comment_date></row><row _id="row-x3np~b4fr_3wfw" _uuid="00000000-0000-0000-B2AB-1301E3D31525" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3np~b4fr_3wfw"><intent_id>573734</intent_id><project_id>710799</project_id><text_data>General Laborer: Performs work of shoveling with a hand shovel, cleaning-sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket.Other Trucks: A Low Boy trailer for delivery and pick up of equipment.</text_data><comment_date>2013-06-06T00:00:00</comment_date></row><row _id="row-kjdx~z8jn-36u5" _uuid="00000000-0000-0000-A59F-9673F067023C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kjdx~z8jn-36u5"><intent_id>874762</intent_id><project_id>837438</project_id><text_data>1)We were contracted to repair furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-11-14T00:00:00</comment_date></row><row _id="row-hm77_svxm.5gpf" _uuid="00000000-0000-0000-2B95-5FD92CF9B62C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hm77_svxm.5gpf"><intent_id>1277332</intent_id><project_id>1036789</project_id><text_data>The trees were about 1 inch round base and a couple of feet tall. A chainsaw was used to cut the trees. Chainsaw 16-inch bar and chain.</text_data><comment_date>2022-11-28T00:00:00</comment_date></row><row _id="row-y56e-vtf9~rdsm" _uuid="00000000-0000-0000-1524-697BDF844D93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y56e-vtf9~rdsm"><intent_id>825275</intent_id><project_id>795764</project_id><text_data>A)	We do not know the full scope of this. We assume they are building a bus barn.B)	Please see the scope listed below from our contract:On Customer&amp;#39;s 40&amp;#39; Full Cant Style GateInstall:1 Ea. SL-5851 Ea. Internal Receiver With Coaxial Antennae3 Ea. Gate Edge Contact Sensors With Wireless Remotes1 Ea. Infrared Photo Cell Non-Contact Sensor With HeaterOn Customer&amp;#39;s 40&amp;#39; Full Cant Style GateInstall:1 Ea. SL-5851 Ea. Internal Receiver With Coaxial Antennae3 Ea. Gate Edge Contact Sensors With Wireless Remotes1 Ea. Infrared Photo Cell Non-Contact Sensor With Heater     Excludes Electrical, Conduit, Conduit Runs, Wire, Wire Pulls, Permits, Access Controls Other Than Listed, Card ReadersC)	Bolt down motors to existing concrete slabs, mount eyes, edges, and commission the system. Tools used are rotary hammer, impact, hand tools and an Econoline van.</text_data><comment_date>2017-04-12T00:00:00</comment_date></row><row _id="row-2uk2_mwxg_agvf" _uuid="00000000-0000-0000-9CF9-491D4EA7192A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2uk2_mwxg_agvf"><intent_id>811790</intent_id><project_id>811533</project_id><text_data>WO&amp;#39;s 2705, 2707, 2708, 2709, 2761,</text_data><comment_date>2017-01-18T00:00:00</comment_date></row><row _id="row-fap5.4syb~vjqh" _uuid="00000000-0000-0000-5142-7CA14525ABC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fap5.4syb~vjqh"><intent_id>642738</intent_id><project_id>735313</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2014-07-22T00:00:00</comment_date></row><row _id="row-s658_j73s-nnfe" _uuid="00000000-0000-0000-5095-86E8A93386A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s658_j73s-nnfe"><intent_id>1266880</intent_id><project_id>1023256</project_id><text_data>Filed by Robin RomansACI # 22-023</text_data><comment_date>2022-09-15T00:00:00</comment_date></row><row _id="row-hgtn.92dw.f5jw" _uuid="00000000-0000-0000-FBAD-DDF69A3D5717" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hgtn.92dw.f5jw"><intent_id>708832</intent_id><project_id>767910</project_id><text_data>This job requires higher of the two rates between state &amp; federal wages. Federal General Laborers Group #3 is a base rate of: $23.85 + fringe of: $10.30 = $34.15 (higher than states rate for Chelan county). Cement Mason&amp;#39;s rate is the same as federal wage = $38.85. Bobcat &amp; excavator is higher in state wages. Truck Drivers (Dump Truck)Group #5 is higher in federal wages: Base $23.38 + Fringe $15.19 = $38.57. Other Trucks Group #4 (Water Trucks-up to 3,000 gallons) is higher in the federal wages: Base $23.27 + Fringe $15.19 = $38.46. Roller is higher in state wages. Loaders are higher in state wages. Brooms are higher in state wages also.</text_data><comment_date>2015-07-21T00:00:00</comment_date></row><row _id="row-jybg_34rq_rnnh" _uuid="00000000-0000-0000-681E-3D6BB85A6D3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jybg_34rq_rnnh"><intent_id>718934</intent_id><project_id>756329</project_id><text_data>Filed by Wendy Rogers</text_data><comment_date>2015-09-03T00:00:00</comment_date></row><row _id="row-sa3c~hujd~tgjb" _uuid="00000000-0000-0000-9324-953DE0C92D2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sa3c~hujd~tgjb"><intent_id>754464</intent_id><project_id>788630</project_id><text_data>install 3 new automation controllers for the pool.  this equipment is like for like, and plug and play units.  This job involved removing off the wall the old controllers with socket wrench, screw driver and then hang the new controller up.  the unit a basically a computer, which requires the unit to be calibrated, set up programming of the unit to balance the water.  All of the electrical is the clients responsibility.  We do no electrical work.  the feed system for acid, and salt and glued pipe to run system.</text_data><comment_date>2016-04-01T00:00:00</comment_date></row><row _id="row-wpzz~e99d_rg7g" _uuid="00000000-0000-0000-4A2B-A1C60CB2A08D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wpzz~e99d_rg7g"><intent_id>501163</intent_id><project_id>677952</project_id><text_data>General Laborer - shovel &amp;/or sweep gravel on edge of roadway.</text_data><comment_date>2012-02-21T00:00:00</comment_date></row><row _id="row-8b42_24n8_pa92" _uuid="00000000-0000-0000-9F24-BE8F19E02452" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8b42_24n8_pa92"><intent_id>1133633</intent_id><project_id>956957</project_id><comment_date>2021-04-05T00:00:00</comment_date></row><row _id="row-wkeg-k7td~g5rf" _uuid="00000000-0000-0000-85C5-B5B02F373B9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wkeg-k7td~g5rf"><intent_id>1104614</intent_id><project_id>940617</project_id><text_data>5/27/20-repair cracked 1 1/2' valve, tighten 1 leaking union, tighten 2 leaking drain valves. Parts used: 1- 1 1/2' p.e.b. rainbird valve, 1- 1 1/2' sch 80 slip union, 3/4' teflon, 1 ft of 1 1/2' sch 40 pvc, 1-2' coupler, 1-2' MA. Tools used: Hand tools, pick and shovel, wrenches.</text_data><comment_date>2020-12-09T00:00:00</comment_date></row><row _id="row-c7k6.2qjv-4f4x" _uuid="00000000-0000-0000-1128-9E703B19D5BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c7k6.2qjv-4f4x"><intent_id>1220791</intent_id><project_id>996601</project_id><text_data>Other Trucks= lowbed, used for mobilization of equipment (Teamster's Union)General Laborer= hand shovel rock and asphalt (Laborer's Union)</text_data><comment_date>2022-03-25T00:00:00</comment_date></row><row _id="row-8ecm.wzya-9r9a" _uuid="00000000-0000-0000-1922-1095C77121E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ecm.wzya-9r9a"><intent_id>521495</intent_id><project_id>684534</project_id><text_data>1306 fairbanks ave yakima wa 98902</text_data><comment_date>2012-07-11T00:00:00</comment_date></row><row _id="row-84ka_ric2-2k8a" _uuid="00000000-0000-0000-25B9-C4449215EADD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-84ka_ric2-2k8a"><intent_id>999452</intent_id><project_id>890197</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.   General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2019-08-14T00:00:00</comment_date></row><row _id="row-suta_7mar-ygsv" _uuid="00000000-0000-0000-DEEC-F0E4B88B29C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-suta_7mar-ygsv"><intent_id>666891</intent_id><project_id>749338</project_id><text_data>1)Install and wire an Energy recovery ventilator in living room for each dwelling. 2)Duplex, 4,5,6 plex. 3)2 4)single family residents a)No b) No c)yes d)No e)No f)No g)No h)No I)No j)No #5)Yes #6)Yes #7)No 8)No</text_data><comment_date>2014-11-21T00:00:00</comment_date></row><row _id="row-c69i_zp5a.py9i" _uuid="00000000-0000-0000-88FB-61CCE1AA8B7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c69i_zp5a.py9i"><intent_id>864428</intent_id><project_id>833240</project_id><text_data>other truck is a water truck for dust control</text_data><comment_date>2017-09-21T00:00:00</comment_date></row><row _id="row-kvuz~8kz3.s5pc" _uuid="00000000-0000-0000-0FE1-1104E80AB1A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvuz~8kz3.s5pc"><intent_id>1136869</intent_id><project_id>947535</project_id><text_data>KLB job# 220094TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2021-04-19T00:00:00</comment_date></row><row _id="row-dd9e-mrjx-yhax" _uuid="00000000-0000-0000-7D79-BA9D49FC116F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dd9e-mrjx-yhax"><intent_id>1509660</intent_id><project_id>1170517</project_id><text_data>Oil Boiler Annual service</text_data><comment_date>2025-02-13T00:00:00</comment_date></row><row _id="row-c9x2~u996.3g9d" _uuid="00000000-0000-0000-90AE-3A2807A728BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9x2~u996.3g9d"><intent_id>666592</intent_id><project_id>749211</project_id><text_data>We installed 4 inches of mulch with wheel barrows and shovels and then rototilled the mulch in with a hand hel 9 horse power 4 cycle rototiller. Then, we dug 93 holes with round point shovels, to a depth of 9 inches to install 5 gallon Portuguese Laurel Plants. We then installed 3 inches of mulch with wheel barrows and square point shovels as well as spring rakes around each plant. The purpose of this project was to beautify the portables at the school so they would look more pleasing to the public at a distance.</text_data><comment_date>2014-11-23T00:00:00</comment_date></row><row _id="row-ik3b~s3im-v9my" _uuid="00000000-0000-0000-2B07-9D7F383A59D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ik3b~s3im-v9my"><intent_id>1240220</intent_id><project_id>993727</project_id><text_data>Installation of irrigation, tree protection, topsoil, sod and plants.  Includes 510 yards of topsoil, grade and hydroseed.</text_data><comment_date>2022-06-09T00:00:00</comment_date></row><row _id="row-fufc-sxdy.78gp" _uuid="00000000-0000-0000-20C5-BC449A530DA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fufc-sxdy.78gp"><intent_id>681589</intent_id><project_id>756730</project_id><text_data>73120 0022</text_data><comment_date>2015-03-03T00:00:00</comment_date></row><row _id="row-8ztm~8aqj-6gmj" _uuid="00000000-0000-0000-416D-200CC77F9FF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ztm~8aqj-6gmj"><intent_id>522280</intent_id><project_id>691600</project_id><text_data>JOB ORDER CONTRACTING - Annual Filing - YEAR 1</text_data><comment_date>2012-07-13T00:00:00</comment_date></row><row _id="row-3s3h-udbz~y3er" _uuid="00000000-0000-0000-1EF3-951E36744DA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3s3h-udbz~y3er"><intent_id>1203721</intent_id><project_id>994605</project_id><text_data>Haz Waste Workers to clean area using rakes/shovelsVac Truck to vacuum all contaminated materials</text_data><comment_date>2022-01-11T00:00:00</comment_date></row><row _id="row-kdcg-qmqe~nptb" _uuid="00000000-0000-0000-C93A-4E7132BFFFC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kdcg-qmqe~nptb"><intent_id>931591</intent_id><project_id>851880</project_id><text_data>Job 17-15-148-07</text_data><comment_date>2018-09-10T00:00:00</comment_date></row><row _id="row-pcun.n3ct.hkz6" _uuid="00000000-0000-0000-09F8-457348C12532" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pcun.n3ct.hkz6"><intent_id>1274528</intent_id><project_id>1035274</project_id><text_data>The project consists of construction of a new bicycle skills park in North Bend with several short trails ranging from beginner-friendly to expert level. The scope of work includes approximately 2.1 miles of new trail construction which includes clearing, grading, trail tread construction, integrated drainage using natural contours, turnpike construction, hardened ford construction, rock retaining wall, and trail hardening. Construction workers will use hand tools such as rakes, shovels, and hoes to shape and manipulate on-site dirt into a hardened trail tread. Trail hardening will be achieved by removal and local broadcast of surface duff and organic soil to expose mineral soil, which will then be shaped with shovels and hoes to provide a firm trail surface and promote drainage from the trail surface without the use of imported drainage structures. All drainage will be accomplished at or above grade using natural contours. No sub-surface drainage or drainage structures are part of this project. Trails will eventually be connected to Snoqualmie Point Park (Raging) by a large multi-use trail.</text_data><comment_date>2022-11-14T00:00:00</comment_date></row><row _id="row-vvqc-n8dh.2wmd" _uuid="00000000-0000-0000-E8E2-C7330CD578CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vvqc-n8dh.2wmd"><intent_id>1062679</intent_id><project_id>920258</project_id><text_data>No work class for concrete cutting</text_data><comment_date>2020-06-04T00:00:00</comment_date></row><row _id="row-qnfb-agrx.xh8q" _uuid="00000000-0000-0000-B969-88AB23FDF2DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qnfb-agrx.xh8q"><intent_id>1011826</intent_id><project_id>885860</project_id><comment_date>2019-10-03T00:00:00</comment_date></row><row _id="row-wteb.4mhf_b8dp" _uuid="00000000-0000-0000-DCF6-52CEC9CE1AAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wteb.4mhf_b8dp"><intent_id>982117</intent_id><project_id>883015</project_id><text_data>Work performed by the Telecommunication Technicians is installing Category 6 cabling for voice and data indoors.314 1ST ST ASOTIN, WA 99402</text_data><comment_date>2019-06-04T00:00:00</comment_date></row><row _id="row-bcfm-jrza-cks4" _uuid="00000000-0000-0000-D4A8-43CC30BDB732" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bcfm-jrza-cks4"><intent_id>576420</intent_id><project_id>713108</project_id><text_data>Wage on check  40.10Savings on check  8.00Hourly wage 48.10Fringe BenefitsHealth and Welfare 10.40National Pension 4.23State Pension 4.52Supplemental Pension 5.00ITF/JACT 1.74LMCCT .30Total fringe 26.19Total package 74.29</text_data><comment_date>2013-06-19T00:00:00</comment_date></row><row _id="row-48xw_c449.88tx" _uuid="00000000-0000-0000-2BEB-B186008EAD8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48xw_c449.88tx"><intent_id>511362</intent_id><project_id>687451</project_id><text_data>Intent and Affidavits for H &amp; H Heating and Air:1308 E. Queen,Spokane,WA 99207 $2132.631011 E. 36th,Spokane,WA 99203 $1810.89Total for this listing: $3,943.52</text_data><comment_date>2012-05-10T00:00:00</comment_date></row><row _id="row-mriw~cs47_977c" _uuid="00000000-0000-0000-23FF-BC3367983FE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mriw~cs47_977c"><intent_id>1092975</intent_id><project_id>934905</project_id><text_data>SC 200829-0004</text_data><comment_date>2020-10-02T00:00:00</comment_date></row><row _id="row-czrb.pzqa.u5b9" _uuid="00000000-0000-0000-FC9D-8C735FEF1CF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-czrb.pzqa.u5b9"><intent_id>1357971</intent_id><project_id>1084101</project_id><text_data>Arbor Care - Tree Care Services SOW #18 - AN #620723 WO #175255Proposed Tree Care ServicesTree Quantity: 4Proposal Value: $82,510August 16, 2023Proposal #: 620723 Misc Trees (4) - Clear 10 feet of fenceline of trees.</text_data><comment_date>2023-08-25T00:00:00</comment_date></row><row _id="row-awx9_vigd_ngnh" _uuid="00000000-0000-0000-EFF2-CC5CA8A14EFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-awx9_vigd_ngnh"><intent_id>804718</intent_id><project_id>808250</project_id><text_data>Supply labor and tools to fell 4 trees and prune 1 tree. Tree to be fell are included in SUF report. Along with SUF report also fell 1 80&amp;#39; Doug Fir that has died. Tree located across from tree 2 on the map. All trees will be fell away from trail and debris left in place for natural decomposition. Additional Fir tree will be fell in sections if approved by climber. If tree is not safe to climb tree will be fell as one complete tree into location with the least amount of debris/trees in the felling path. Clean up any debris that falls on the trail while completing task. Landscaping rate includes clean up and drive time.</text_data><comment_date>2016-11-30T00:00:00</comment_date></row><row _id="row-jrng_fny8~rrq8" _uuid="00000000-0000-0000-4AD0-80854D8E1D8C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jrng_fny8~rrq8"><intent_id>1014348</intent_id><project_id>883985</project_id><text_data>9N59-0088</text_data><comment_date>2019-10-09T00:00:00</comment_date></row><row _id="row-pnbf_rvdn.39t9" _uuid="00000000-0000-0000-AA16-19AFF19E9A2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pnbf_rvdn.39t9"><intent_id>511322</intent_id><project_id>665840</project_id><text_data>For projects with a bid due date of 04/10/2012 forward, all claimed fringe benefits must be calculated on the annualized figure of 2,080 and workers must be compensated based upon this calculation method.</text_data><comment_date>2012-05-14T00:00:00</comment_date></row><row _id="row-vuba~umdn~c594" _uuid="00000000-0000-0000-BDC2-8ECB82FA1C90" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vuba~umdn~c594"><intent_id>969194</intent_id><project_id>877395</project_id><text_data>this was mitigation  loss happened on same day we started job so bid due date and job start are 2-20-2019</text_data><comment_date>2019-04-03T00:00:00</comment_date></row><row _id="row-r5y7.nz57.aedu" _uuid="00000000-0000-0000-8558-C1A081ADA5A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5y7.nz57.aedu"><intent_id>1274014</intent_id><project_id>1035006</project_id><text_data>sr53123922</text_data><comment_date>2022-10-11T00:00:00</comment_date></row><row _id="row-zi5v.2pwb.x3ce" _uuid="00000000-0000-0000-003D-700D58CF543C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zi5v.2pwb.x3ce"><intent_id>1116267</intent_id><project_id>946172</project_id><text_data>Kenworth T800 Lowboy truck for equipment delivery</text_data><comment_date>2021-01-19T00:00:00</comment_date></row><row _id="row-jx44-p93x-azqa" _uuid="00000000-0000-0000-8BF0-6E87D4E2A69A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jx44-p93x-azqa"><intent_id>495115</intent_id><project_id>455947</project_id><text_data>Awarding Agency Contact Person: Desiree WinklerAwarding Agency Phone Number: 253-589-2489</text_data><comment_date>2012-01-04T00:00:00</comment_date></row><row _id="row-qirc-ec4f.x24q" _uuid="00000000-0000-0000-48CA-739B9AB128D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qirc-ec4f.x24q"><intent_id>481571</intent_id><project_id>673028</project_id><text_data>this project in to install a new walking use path by the general contractro. Our bid is to seed the disturebed areas and then plant some wetlands plants by hand or with shovels. No bark or mulch will be installed</text_data><comment_date>2011-10-03T00:00:00</comment_date></row><row _id="row-7aqc.9s7v.u4tu" _uuid="00000000-0000-0000-18BE-080225DEBD65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7aqc.9s7v.u4tu"><intent_id>1213680</intent_id><project_id>1000843</project_id><text_data>1. What is/was the specific purpose of this awarding agency's public works project? Provide and support a Building Management System2. Does this project include fabrication, delivery, installation of non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. No3. Does this specific project entail the remodeling or new construction of a facility? No4. If your firm is working upon a type of building system, what type of system is involved? Building Management System5. What specific tasks will your employees perform? Engineering, programming, commissioning, graphics, training6. What, if any, tools will your employees use in the performance of those tasks? Laptops and software.7. If your employees will use no tools, will they engage in any other type of manual, hands on efforts completing their tasks? Interface to system using laptop computers.8. Are you going to be hiring any subcontractors for this project? No9. When is your work to be completed? Planning or pre-construction phase or during the public works project? Same Day Service</text_data><comment_date>2022-02-24T00:00:00</comment_date></row><row _id="row-fnj8_qr9c~rrk2" _uuid="00000000-0000-0000-0CB3-0CDD02D918B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fnj8_qr9c~rrk2"><intent_id>732150</intent_id><project_id>773533</project_id><text_data>&amp;quot;TRUCK DRIVER OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK; &amp;quot;POWER EQUIPMENT OPERATOR MOTOR PATROL GRADER FINISHER&amp;quot; - NOT MOTOR PATROL, VACTOR GUZZLER/VACCON SUPER SUCKER</text_data><comment_date>2015-11-18T00:00:00</comment_date></row><row _id="row-ntar-yzgp~skgb" _uuid="00000000-0000-0000-AC0A-869893D7CC5A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ntar-yzgp~skgb"><intent_id>554314</intent_id><project_id>704042</project_id><text_data>We will be working on the areas around the trees using an air spade.  We will be adding different depths of topsoil and mulch.  There will be 3 different profiles for the soil placement out at McGilvra Place ranging from 2&amp;quot; to 6&amp;quot;.  We will be removing approximately 2100sf of sod and replacing approximately 1700sf of new sod.  We will also be construction a paver runnel drainage system.</text_data><comment_date>2013-02-07T00:00:00</comment_date></row><row _id="row-n7at~z2s5~3qc6" _uuid="00000000-0000-0000-35D8-D02505245645" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n7at~z2s5~3qc6"><intent_id>1509679</intent_id><project_id>1170525</project_id><text_data>oil furnace annual service</text_data><comment_date>2025-02-13T00:00:00</comment_date></row><row _id="row-xbtx_3g33.grnx" _uuid="00000000-0000-0000-8F43-3E55B99256BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xbtx_3g33.grnx"><intent_id>662738</intent_id><project_id>744495</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2014-10-28T00:00:00</comment_date></row><row _id="row-zjhg-yg65.npxs" _uuid="00000000-0000-0000-C3C0-4261BAE1FA1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zjhg-yg65.npxs"><intent_id>576118</intent_id><project_id>713609</project_id><text_data>Intents and affidavits for H and H Heating and Air:3123 E. 17th Ave, Spokane, WA 99223 $500.005206 W. Matts Lane, Spokane, WA 99224Total for this listing: $959.78</text_data><comment_date>2013-06-18T00:00:00</comment_date></row><row _id="row-gc6d~wjhz.2d3n" _uuid="00000000-0000-0000-E73B-BFB8320F252E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gc6d~wjhz.2d3n"><intent_id>771049</intent_id><project_id>793140</project_id><text_data>(A) Sewer repairs via open trench and CIPP (Cured-in-Place-Pipelining). (B) Cleaning of side-sewers,installation of CIPP liners into side-sewers, robotic cutting of side-sewers and final video inspection of side-sewers.(C)Employees will be using a trailer mounted Hydro-jetter and portable Robotic cutter to clean side-sewers before installation of CIPP. Then Employess will install CIPP liners into side-sewers using specialize inverters and a turn-key lining van. Once CIPP liners have cured employee will video inspect side-sewer with Push video camera.</text_data><comment_date>2016-07-07T00:00:00</comment_date></row><row _id="row-wr2j-927b.wfsj" _uuid="00000000-0000-0000-B1E6-D751FA3775F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wr2j-927b.wfsj"><intent_id>698593</intent_id><project_id>757981</project_id><text_data>Form filedl by:  Ilaria Hare Heiderich</text_data><comment_date>2015-06-04T00:00:00</comment_date></row><row _id="row-yc78~qk5r.tgam" _uuid="00000000-0000-0000-734C-890B06E273B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yc78~qk5r.tgam"><intent_id>542625</intent_id><project_id>698935</project_id><text_data>Clean up diesel spill on streetMotor Patrol Grader to vacuum contaminated materials</text_data><comment_date>2012-11-01T00:00:00</comment_date></row><row _id="row-nivc.nypc~prk9" _uuid="00000000-0000-0000-2524-3BC8695A45D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nivc.nypc~prk9"><intent_id>1205573</intent_id><project_id>974225</project_id><text_data>1/19/22 - New intent filed to add hiring of subcontractors.</text_data><comment_date>2022-01-19T00:00:00</comment_date></row><row _id="row-tifd~vvt9.msyy" _uuid="00000000-0000-0000-0C36-FD5F888A0726" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tifd~vvt9.msyy"><intent_id>615025</intent_id><project_id>724623</project_id><text_data>We provide 100% Employee Health Care as Fringe Benefit</text_data><comment_date>2014-02-04T00:00:00</comment_date></row><row _id="row-9ipn.5w6q-3ib6" _uuid="00000000-0000-0000-7557-253A5952B3EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ipn.5w6q-3ib6"><intent_id>1038402</intent_id><project_id>893246</project_id><text_data>We subcontract owner/operator truck drivers to move modular buildings using their own truck and modular trailers from one location to another.</text_data><comment_date>2020-02-13T00:00:00</comment_date></row><row _id="row-ws4j.4uxd.c6d6" _uuid="00000000-0000-0000-DF79-4519509EE2CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ws4j.4uxd.c6d6"><intent_id>558730</intent_id><project_id>706175</project_id><text_data>Does include pesticide application.</text_data><comment_date>2013-03-08T00:00:00</comment_date></row><row _id="row-2wz2-i6hg-8rk7" _uuid="00000000-0000-0000-E49C-467FE44DDA11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2wz2-i6hg-8rk7"><intent_id>1279036</intent_id><project_id>1037747</project_id><text_data>Mulch was installed in rain garden beds by Pacific Topsoil.  Our crews only provided basic maintenance services that included hand weeding, hand pruning and general clean up of debris.</text_data><comment_date>2022-12-02T00:00:00</comment_date></row><row _id="row-qte2-pyy3_f2hx" _uuid="00000000-0000-0000-2E95-E016BB98ED76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qte2-pyy3_f2hx"><intent_id>501040</intent_id><project_id>682996</project_id><text_data>Alt contacts: Jason Harlow @ 360-644-4070 or Lloyd Rawlins @ 360-664-4069</text_data><comment_date>2012-02-20T00:00:00</comment_date></row><row _id="row-chwk.f98s-kyxp" _uuid="00000000-0000-0000-4A1E-E08A214DDFDB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-chwk.f98s-kyxp"><intent_id>454227</intent_id><project_id>665429</project_id><text_data>Laborers Specific duties:Carpenter Tender, Concrete form stripper, erosion constrol, form setter, scaffold erector,Demolition wrecking &amp; removing Laborers.</text_data><comment_date>2011-05-17T00:00:00</comment_date></row><row _id="row-exyq~ktde.588i" _uuid="00000000-0000-0000-8161-FAFEC5B7B3D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-exyq~ktde.588i"><intent_id>804161</intent_id><project_id>808010</project_id><text_data>Addendum CProject Name: Goheen Revetment Repair and McAleer Creek Habitat Enhancement ProjectContract Number:  7159Your Company Name:  Herrera Environmental Consultants IncTitle:  Robin Saavedra, Accounting AdministratorYour UBI Number:  600633936Your Contractor Registration Number: N/AAwarding Agency:  City of ShorelineHerrera will conduct vegetation, hydrology, and wildlife monitoring for the project to document whether the Year 2 performance standards are being achieved.  Two site monitoring visits will be conducted by Herrera staff with expertise in native and invasive plants in Year 2. Following each site visit, Herrera will prepare a brief memorandum for City staff outlining site observations and plant establishment trends.  Monitoring results and recommendations for site maintenance will be provided to the City in a Year 2 Monitoring Report.Herrera will coordinate and provide oversight of subcontractors conducting site maintenance as recommended in the monitoring memos and the Year 2 Monitoring Report, and approved by the City.Herrera will conduct vegetation, hydrology, and wildlife monitoring for the project to document whether the Year 3 performance standards are being achieved. One site monitoring visit will be conducted by Herrera staff with expertise in native and invasive plants in Year 3. Monitoring results and recommendations for site maintenance will be provided to the City in a Year 3 Monitoring Report.Herrera will coordinate and provide oversight of subcontractors conducting site maintenance based on observations in site visits preceding preparation of the Year 3 Monitoring Report and approved by the City.Herrera will conduct vegetation, hydrology, and wildlife monitoring for the project to document whether the Year 4 performance standards are being achieved. One site monitoring visit will be conducted by Herrera staff with expertise in native and invasive plants in Year 4. Monitoring results and recommendations for site maintenance will be provided to the City in the Year 4 Monitoring Report.Herrera will coordinate and provide oversight of subcontractors conducting site maintenance based on observations in site visits preceding preparation of the Year 4 Monitoring Report, and approved by the City. Herrera will be responsible for ongoing management and contract administration of this project, including preparing invoices and progress reports as well as coordination of work efforts with the designated City of Shoreline contact. Herrera�s project manager and contract manager will have phone, e-mail, and in-person contact with the City of Shoreline on an as-needed basis. This task includes coordination with the City�s project manager via occasional emails and brief telephone calls to confirm progress and schedule for site visits and deliverables.</text_data><comment_date>2016-11-28T00:00:00</comment_date></row><row _id="row-6yqm.qgx8_skka" _uuid="00000000-0000-0000-A1AD-A0A67A6DE57E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6yqm.qgx8_skka"><intent_id>524966</intent_id><project_id>687391</project_id><text_data>Labor was unloading walk-in panels and erecting.</text_data><comment_date>2012-07-27T00:00:00</comment_date></row><row _id="row-nnuv.knz9_pybb" _uuid="00000000-0000-0000-F4C4-702C0AEA1996" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nnuv.knz9_pybb"><intent_id>811093</intent_id><project_id>811213</project_id><text_data>Job 14712 EWR#1</text_data><comment_date>2017-01-13T00:00:00</comment_date></row><row _id="row-5wnt_ajud.2dyw" _uuid="00000000-0000-0000-965D-8CC1B9B60391" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5wnt_ajud.2dyw"><intent_id>768237</intent_id><project_id>794420</project_id><text_data>Seal coat tennis court.  Use push broom to brush off area to be coated.  Clean out crack with small broom and seal with crack seal. Owner used bucket to fill cracks.  Apply seal coat by flood coat method using push squeegees.  Tools will be broom and squeegees.  Normal work truck will be driven to jobsite by owner.  No special trucks like dump trucks ect will be used.</text_data><comment_date>2016-06-20T00:00:00</comment_date></row><row _id="row-h5g6~fb72.92ge" _uuid="00000000-0000-0000-D2E1-FE7C42CD47AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h5g6~fb72.92ge"><intent_id>997351</intent_id><project_id>885263</project_id><text_data>Dump Truck - Owner/Operator. WA Rock #012XFR Northwood Middle School Field Renovation Phase II project.</text_data><comment_date>2019-08-06T00:00:00</comment_date></row><row _id="row-zsb7.56jw.z2ia" _uuid="00000000-0000-0000-6955-4EF7B3A07508" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zsb7.56jw.z2ia"><intent_id>535246</intent_id><project_id>696010</project_id><text_data>All steel placement and handling of steel will be paid at the Ironworkers rate. The general laborers will be applicable for drilling holes in concrete and placing eye bolts into concrete and cleaning up for the eye bolt installation operation only. A roto hammer will be used to drill the holes.</text_data><comment_date>2012-09-21T00:00:00</comment_date></row><row _id="row-pgh2-c4yz.7isq" _uuid="00000000-0000-0000-3FE9-B46BDEBF5BFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pgh2-c4yz.7isq"><intent_id>1084340</intent_id><project_id>930924</project_id><comment_date>2020-08-28T00:00:00</comment_date></row><row _id="row-svnt_whvz~furg" _uuid="00000000-0000-0000-5740-B355F9A4B3C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-svnt_whvz~furg"><intent_id>523361</intent_id><project_id>674911</project_id><text_data>Form filed by: Frederick Benninghoff3240 N. Lodge Pole Ln #7 Oak Harbor, WA. 98277</text_data><comment_date>2012-07-19T00:00:00</comment_date></row><row _id="row-ehs4.98kf~89cg" _uuid="00000000-0000-0000-AA98-080194B2D28B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ehs4.98kf~89cg"><intent_id>1105486</intent_id><project_id>921697</project_id><text_data>3200060 - DESC 22 - South Phase</text_data><comment_date>2020-11-23T00:00:00</comment_date></row><row _id="row-uisc_t2zm.x56c" _uuid="00000000-0000-0000-E581-FF725E5873C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uisc_t2zm.x56c"><intent_id>633049</intent_id><project_id>735989</project_id><text_data>WORKERS COMP CARRIER - SAIF CORP, POLICY #947202WE DO NOT HAVE ANY EMPLOYEES THAT ARE RESIDENTS OF WASHINGTON</text_data><comment_date>2014-06-04T00:00:00</comment_date></row><row _id="row-uat8_id3s~a28p" _uuid="00000000-0000-0000-1146-F1C12FCB4343" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uat8_id3s~a28p"><intent_id>821264</intent_id><project_id>814679</project_id><text_data>Landscaping maintenance- Mowing, blowing, lea collection, trimming, edging, pruning, weed spraying</text_data><comment_date>2017-03-16T00:00:00</comment_date></row><row _id="row-9iyp-3pwa.wytr" _uuid="00000000-0000-0000-EC89-BB18468D671E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9iyp-3pwa.wytr"><intent_id>1241151</intent_id><project_id>1017567</project_id><comment_date>2022-06-14T00:00:00</comment_date></row><row _id="row-7wkm~8k36-rtq7" _uuid="00000000-0000-0000-A0B1-B30370E0D432" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7wkm~8k36-rtq7"><intent_id>812940</intent_id><project_id>808805</project_id><text_data>Work performed by the Telecommunication Technicians is installing Cat6 cabling for data indoors.  The purpose of the data cabling being installed is for computer networking. Physical location: 6501 S 19th St, Tacoma, WA 98466</text_data><comment_date>2017-01-26T00:00:00</comment_date></row><row _id="row-t943-ci4t_i39s" _uuid="00000000-0000-0000-3CBD-87D047E7D889" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t943-ci4t_i39s"><intent_id>875541</intent_id><project_id>837762</project_id><text_data>Inv #8845 - PO #PW-17182 - $9403.48Inv #8846 - PO #PW15207 - $900.64</text_data><comment_date>2017-11-17T00:00:00</comment_date></row><row _id="row-m2vk_ms2g.bvh5" _uuid="00000000-0000-0000-36F4-8319B21C39DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2vk_ms2g.bvh5"><intent_id>1094331</intent_id><project_id>882725</project_id><text_data>Brumfield hired us</text_data><comment_date>2020-10-08T00:00:00</comment_date></row><row _id="row-njf7.7ahz-c3w3" _uuid="00000000-0000-0000-098E-8BDE3EB5AD75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-njf7.7ahz-c3w3"><intent_id>478021</intent_id><project_id>674412</project_id><text_data>Dump truck up to and including 12 yds.</text_data><comment_date>2011-09-14T00:00:00</comment_date></row><row _id="row-83r8-38zw-dire" _uuid="00000000-0000-0000-FA3F-0430950EB479" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-83r8-38zw-dire"><intent_id>976922</intent_id><project_id>880726</project_id><text_data>Invoice #01-28046</text_data><comment_date>2019-05-09T00:00:00</comment_date></row><row _id="row-twu6_ths7~w7hc" _uuid="00000000-0000-0000-C6B6-C259EA4FD586" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-twu6_ths7~w7hc"><intent_id>661920</intent_id><project_id>744439</project_id><text_data>All work performed by laborers will be in accordance with WAC296-127-01344 and all work will be done in accordance with the local union jurisdictions.</text_data><comment_date>2014-10-27T00:00:00</comment_date></row><row _id="row-ftyk_xs8s.jpyb" _uuid="00000000-0000-0000-6A2F-85C008C0AF7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ftyk_xs8s.jpyb"><intent_id>743721</intent_id><project_id>783691</project_id><text_data>Install new gutters on a couple of building using gutter box van and gutter extruder.</text_data><comment_date>2016-02-01T00:00:00</comment_date></row><row _id="row-nba8~xfry-rxfh" _uuid="00000000-0000-0000-911C-358632C74018" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nba8~xfry-rxfh"><intent_id>682744</intent_id><project_id>757196</project_id><text_data>Installing a sprinkler system and seeding the lawn areas</text_data><comment_date>2015-03-09T00:00:00</comment_date></row><row _id="row-8jb3~d2bg.emi8" _uuid="00000000-0000-0000-60DB-2CEF2915A00C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8jb3~d2bg.emi8"><intent_id>1222408</intent_id><project_id>1006499</project_id><text_data>INV # 88490700 SR # 51365218</text_data><comment_date>2022-03-31T00:00:00</comment_date></row><row _id="row-r5gt_mbrn~8itd" _uuid="00000000-0000-0000-1061-F2B84D8E9CDB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5gt_mbrn~8itd"><intent_id>840941</intent_id><project_id>824533</project_id><text_data>There will be more work on this project to repair damage that happen</text_data><comment_date>2017-06-29T00:00:00</comment_date></row><row _id="row-7zur~6ab6~ji5j" _uuid="00000000-0000-0000-2E59-37E73A662715" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7zur~6ab6~ji5j"><intent_id>1057917</intent_id><project_id>918936</project_id><text_data>**Other trucks: 4,000 gallon water truck</text_data><comment_date>2020-05-14T00:00:00</comment_date></row><row _id="row-m83d_8nc7.ncjr" _uuid="00000000-0000-0000-DEAE-D3AA52079349" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m83d_8nc7.ncjr"><intent_id>1174503</intent_id><project_id>976829</project_id><text_data>Truck Driver - Other Trucks - Lowboy DriverTruck Driver - Other Trucks - Sweeper</text_data><comment_date>2021-09-02T00:00:00</comment_date></row><row _id="row-xubm.4upx-vkgw" _uuid="00000000-0000-0000-B8F4-B158128D3199" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xubm.4upx-vkgw"><intent_id>661548</intent_id><project_id>747124</project_id><text_data>EC01 #ECKVAELEI862LP</text_data><comment_date>2014-10-21T00:00:00</comment_date></row><row _id="row-xei9~56c3_q6ie" _uuid="00000000-0000-0000-4FF4-ECAD8BA2F6A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xei9~56c3_q6ie"><intent_id>480165</intent_id><project_id>675131</project_id><text_data>This is a a work order on a Job Order Contract.</text_data><comment_date>2011-09-26T00:00:00</comment_date></row><row _id="row-h2t8-xsxk_mwtt" _uuid="00000000-0000-0000-8D72-041656359B10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2t8-xsxk_mwtt"><intent_id>900924</intent_id><project_id>849278</project_id><text_data>remove 10-ft existing gutter, install 28ft approx. of new white 5&amp;quot; K-style gutter and 18ft of snow breaks</text_data><comment_date>2018-04-26T00:00:00</comment_date></row><row _id="row-sqcw.5njp-dzrh" _uuid="00000000-0000-0000-BE96-A0AAB09FA2AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sqcw.5njp-dzrh"><intent_id>1037754</intent_id><project_id>889461</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a - no; 4b - no; 4c - yes; 4d - no; 4e - no; 4f - no; 4g - no; 4h - no; 4i - no; 4j - no; 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2020-02-12T00:00:00</comment_date></row><row _id="row-5dgi~g6td~53my" _uuid="00000000-0000-0000-D03D-3E734B9C826A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5dgi~g6td~53my"><intent_id>807757</intent_id><project_id>805535</project_id><text_data>$1.76 National Pension, $0.17 ($0.12 ITI, $0.03 NEMIC, $0.02 SMOHIT), $5.51 NW Pension, $0.63 NW 401K, $10.16 Healthcare Plan A, $0.61 VEBA, $0.32 Extended Benefits, $0.37 Industry Fund, $0.90 Local Training, $1.58 Org. Trust, $0.03 SNAP Clean card.</text_data><comment_date>2017-01-04T00:00:00</comment_date></row><row _id="row-zq3m.6ibj.iu6x" _uuid="00000000-0000-0000-9AA3-9BEADB5E2E80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zq3m.6ibj.iu6x"><intent_id>599146</intent_id><project_id>721320</project_id><text_data>Fringe Breakdown:Pension(s) $7.80Health &amp; Welfare $8.85Vacation: $1.15Flex Plan $1.20NECA Dues $.85Apprenticeship Training: .74</text_data><comment_date>2013-10-16T00:00:00</comment_date></row><row _id="row-hkje-ktgj~zm5p" _uuid="00000000-0000-0000-E7D9-2475D8842E3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hkje-ktgj~zm5p"><intent_id>1316911</intent_id><project_id>1061706</project_id><text_data>Telecommunication Technician will install CBRS Radios and Antennas on structure outdoors. Tech will route hybrid cable (48V &amp; Fiber) down to outdoor equipment cabinet.  The hybrid cable will be terminated the 48V power and battery system.  The fiber will be terminated into a switch.  The switch will have the incoming internet connection termination.</text_data><comment_date>2023-04-07T00:00:00</comment_date></row><row _id="row-qn2u_exg2_8vge" _uuid="00000000-0000-0000-4E9B-E1FD1DAB9309" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qn2u_exg2_8vge"><intent_id>873414</intent_id><project_id>836871</project_id><text_data>WO #8030356</text_data><comment_date>2017-11-07T00:00:00</comment_date></row><row _id="row-tcdz~835t-benv" _uuid="00000000-0000-0000-FA36-D731D3DFD215" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tcdz~835t-benv"><intent_id>535688</intent_id><project_id>696389</project_id><text_data>We went through the elementary schools existing sprinklers systems and made repairs as needed. Including replacing sprinkler heads, repairing breaks in main lines and re-wiring control boxes.</text_data><comment_date>2012-09-25T00:00:00</comment_date></row><row _id="row-2pfe_4qjx~mx4w" _uuid="00000000-0000-0000-1868-4214E5D581A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2pfe_4qjx~mx4w"><intent_id>1110914</intent_id><project_id>907345</project_id><text_data>0N59-0148</text_data><comment_date>2020-12-18T00:00:00</comment_date></row><row _id="row-ub7q-pqhg_xn2e" _uuid="00000000-0000-0000-3ED6-ED1EAD242DEF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ub7q-pqhg_xn2e"><intent_id>580189</intent_id><project_id>713913</project_id><text_data>#1 Describe the work that your firm was contracted to perform. Fascia repairs #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Residential apartments #3 - Including any basement or garage, how many stories or levels does the structure have? 3 levels #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No (b) Any retail use in the structure? No (c) Permanent residence only? Yes (d) Rehabilitation house? No (e) Transitional housing? No (f) Communal dining facility? No (g) Treatment services? No (h) Dormitories? No (i) Counseling? No (j) Is each room and/or bed in the structure rented separately? Yes (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? Yes #6 - Does each dwelling unit have its own bathroom? Yes #7 - Is there a community facility or manager�s office on site? Yes #8 - Is any part of the structure used by members of the public? No.� Please note this job has already been approved as Residential by L&amp;I. The Intent #13284 has all these questions answered on notes. Thank you.</text_data><comment_date>2013-07-15T00:00:00</comment_date></row><row _id="row-v8jp-8ers-tai7" _uuid="00000000-0000-0000-ABB3-B2266D2B9785" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8jp-8ers-tai7"><intent_id>842811</intent_id><project_id>825294</project_id><text_data>WO #8025527</text_data><comment_date>2017-06-23T00:00:00</comment_date></row><row _id="row-3vpn~myhi_s7x8" _uuid="00000000-0000-0000-DEA0-F8A988FEF6AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3vpn~myhi_s7x8"><intent_id>1057181</intent_id><project_id>891526</project_id><text_data>Whole Proj: Construction of a new roadway section and/or grind and overlay of roadway surface along E Fairbanks St from E Howe St to Roosevelt Ave. Includes the installation of new catch basins, inlet structures, sewer line, water main replacement, concrete sidewalk, curbs, gutters, sidewalk repair and installation of trees.Our Portion: The beautification of area adjacent to roadway thru the installation of 8 trees and bark mulch.Equip: Mini Excavator 37 hp or backhoe (under the 90 hp threshold for landscape equipment) and hand tools.</text_data><comment_date>2020-05-11T00:00:00</comment_date></row><row _id="row-nwg2.tn93.ug76" _uuid="00000000-0000-0000-365D-F89D60675D7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nwg2.tn93.ug76"><intent_id>759454</intent_id><project_id>788522</project_id><text_data>Fringe BreakdownLABORERS:  $11.23H &amp; W   = $6.10Pension = $4.50Training= $0.55Trust     = $0.08OPERATORS:  $13.55H &amp; W   = $6.15Pension = $6.75Training= $0.65TEAMSTERS:  $16.69H &amp; W   = $9.84Pension = $6.60Training= $0.25</text_data><comment_date>2016-04-29T00:00:00</comment_date></row><row _id="row-i2q6-p42g.pe84" _uuid="00000000-0000-0000-9CA8-6C4E5648B4ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2q6-p42g.pe84"><intent_id>1142597</intent_id><project_id>961237</project_id><text_data>'Other Trucks' will consist of a lowbed tractor and trailer used to mobilize equipment to the site.</text_data><comment_date>2021-05-06T00:00:00</comment_date></row><row _id="row-7a83.dvaw-q99j" _uuid="00000000-0000-0000-E459-D8777B84D599" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7a83.dvaw-q99j"><intent_id>799555</intent_id><project_id>806407</project_id><text_data>Filed by Robin Saavedra</text_data><comment_date>2016-11-03T00:00:00</comment_date></row><row _id="row-zdij_yvgb-wviw" _uuid="00000000-0000-0000-8514-2E7766BBA94F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdij_yvgb-wviw"><intent_id>786751</intent_id><project_id>801486</project_id><text_data>Disregard the previous Industrial Insurance ID number. The correct one is: 40911701</text_data><comment_date>2016-09-14T00:00:00</comment_date></row><row _id="row-qp7y_zsaf_s9ew" _uuid="00000000-0000-0000-5C70-3FDB8C543937" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qp7y_zsaf_s9ew"><intent_id>1041309</intent_id><project_id>854790</project_id><text_data>0719028</text_data><comment_date>2020-02-26T00:00:00</comment_date></row><row _id="row-8i4v.j23n-2wer" _uuid="00000000-0000-0000-6314-DA713B37F0A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8i4v.j23n-2wer"><intent_id>485648</intent_id><project_id>676931</project_id><text_data>Insecticide application on 149 City owned right of way Cherry trees for Cherry Bark Tortix insect management</text_data><comment_date>2011-10-25T00:00:00</comment_date></row><row _id="row-pnwz-d5ep~r7m7" _uuid="00000000-0000-0000-41D6-D73235CD3FB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pnwz-d5ep~r7m7"><intent_id>1116906</intent_id><project_id>947516</project_id><text_data>#1 � The crew will be doing an electrical safety inspection and replacing the wood steps and handrail.#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2021-01-21T00:00:00</comment_date></row><row _id="row-htjm-gngw-qjcg" _uuid="00000000-0000-0000-E978-4380091AB26C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-htjm-gngw-qjcg"><intent_id>614925</intent_id><project_id>728149</project_id><text_data>WORKERS COMP CARRIER - SAIF CORP, POLICY #947202WE DO NOT HAVE ANY EMPLOYEES THAT ARE RESIDENTS OF WASHINGTON</text_data><comment_date>2014-02-04T00:00:00</comment_date></row><row _id="row-8ckq_qey2-932q" _uuid="00000000-0000-0000-E829-C77E06C950D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ckq_qey2-932q"><intent_id>870119</intent_id><project_id>835516</project_id><text_data>GENERAL LABORER:  PERFORMS FINAL CLEANUP AFTER THE CONSTRUCTION HAS BEEN COMPLETED.  TOOLS: SHOVELSTRK DRIVER/OTHER:  WATER TRUCKS WHICH HOLD UP TO 4000 GAL OF WATER.  USED FOR DUST CONTROL</text_data><comment_date>2017-10-19T00:00:00</comment_date></row><row _id="row-rv72-cbgr~shv7" _uuid="00000000-0000-0000-50CE-9ACA6DDC81A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rv72-cbgr~shv7"><intent_id>462297</intent_id><project_id>650984</project_id><text_data>As a note to you....We do not agree with your decision to make us pay a &amp;quot;Truck driver&amp;quot; as we do not have what should be a truck driver on this job.</text_data><comment_date>2011-08-01T00:00:00</comment_date></row><row _id="row-swmd~rufw.czkv" _uuid="00000000-0000-0000-0F49-41ECE6A24E16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-swmd~rufw.czkv"><intent_id>1293518</intent_id><project_id>979033</project_id><text_data>Please note that if claimed Vacation Pay is employee-paid through a deduction from gross wages, it may not be claimed as a fringe benefit credit. Workers must be reimbursed for any wage underpayments due to this ineligible fringe benefit credit. Approval of Intent or Affidavit is based upon information provided by the contractor and does not signify approval of trade classifications or fringe benefits claimed.</text_data><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-5wvi-ietg-jh6c" _uuid="00000000-0000-0000-E40C-EEE6FB1DB06A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5wvi-ietg-jh6c"><intent_id>648604</intent_id><project_id>742094</project_id><text_data>DATA CABLING FOR WIRELESS ACCESS POINTS INDOORS THROUGHOUT LINCOLN</text_data><comment_date>2014-08-19T00:00:00</comment_date></row><row _id="row-w8wh_twfa_pwe5" _uuid="00000000-0000-0000-C4DB-8A9EC2F929A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w8wh_twfa_pwe5"><intent_id>1198541</intent_id><project_id>967496</project_id><text_data>Yeison Pinto- Owner/Operator</text_data><comment_date>2021-12-10T00:00:00</comment_date></row><row _id="row-mjjh~hwb7~892v" _uuid="00000000-0000-0000-618F-FE716F3190C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mjjh~hwb7~892v"><intent_id>642008</intent_id><project_id>734132</project_id><text_data>General Laborer - Use of shovel and clean up workOther trucks - 0 to 8,000 gallon water truck used for dust control</text_data><comment_date>2014-07-18T00:00:00</comment_date></row><row _id="row-29wk~uwsh_5g8w" _uuid="00000000-0000-0000-AF4C-66666175E9F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-29wk~uwsh_5g8w"><intent_id>785270</intent_id><project_id>800907</project_id><text_data>1. WIRING FOR DUCTLESS HEAT PUMP 2.SIGNLE FAMILY DWELLING. 3. ONE STORY. 4. (A)NO (B) NO (C)YES (D)NO (E) NO (F) NO (G) NO (H) NO (I) NO (J) NO (K) NO 5. YES 6. YES 7. NO</text_data><comment_date>2016-08-25T00:00:00</comment_date></row><row _id="row-qdkk-ex9p-ysuj" _uuid="00000000-0000-0000-990D-6BCAF2EDC856" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qdkk-ex9p-ysuj"><intent_id>1500727</intent_id><project_id>1164995</project_id><text_data>Weatherization / insulation upgrade for a single family homeNo retail or commercial activities on premiseNo on site manager or no multi rentals units</text_data><comment_date>2025-01-10T00:00:00</comment_date></row><row _id="row-misk.4ruc~fvjj" _uuid="00000000-0000-0000-B51E-4E85FD73AD6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-misk.4ruc~fvjj"><intent_id>1239225</intent_id><project_id>984578</project_id><text_data>We will be installing an irrigation system, not to exceed 36 inches in depth. We will be installing topsoil and bark using a conveyor truck. We will be installing trees and plants using various hand tools such as shovels and rakes and hand held augers. We will not be installing any subsurface water collection system.</text_data><comment_date>2022-06-07T00:00:00</comment_date></row><row _id="row-96kt-x9gu.2yvh" _uuid="00000000-0000-0000-AC64-FEF934E87E78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96kt-x9gu.2yvh"><intent_id>548166</intent_id><project_id>701331</project_id><text_data>This is a KCDA Purchasing Coop. Job.</text_data><comment_date>2012-12-12T00:00:00</comment_date></row><row _id="row-gv34~if5p.6stf" _uuid="00000000-0000-0000-62AC-5BD32942964E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gv34~if5p.6stf"><intent_id>926030</intent_id><project_id>858869</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2018-08-15T00:00:00</comment_date></row><row _id="row-gprt.ehwf_5bh9" _uuid="00000000-0000-0000-120A-3ECC456E4C18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gprt.ehwf_5bh9"><intent_id>1267279</intent_id><project_id>1031426</project_id><text_data>S032466</text_data><comment_date>2022-09-16T00:00:00</comment_date></row><row _id="row-tczz.8tgz~6mtg" _uuid="00000000-0000-0000-4ABC-5D7C6F17B991" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tczz.8tgz~6mtg"><intent_id>1359675</intent_id><project_id>1068524</project_id><text_data>SUB FOR POE ASPHALT</text_data><comment_date>2023-08-31T00:00:00</comment_date></row><row _id="row-pa5f-tax3~gyvi" _uuid="00000000-0000-0000-1413-372B166BD724" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pa5f-tax3~gyvi"><intent_id>844353</intent_id><project_id>825879</project_id><text_data>Extract water from crawlspace caused by irrigation overflow in neighboring field.#1 - Describe the work that your firm was contracted to perform. water extraction from the crawlspace.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have? One#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No(b) Any retail use in the structure? No(c) Permanent residence only? Yes (d) Rehabilitation house? No(e) Transitional housing? No(f) Communal dining facility? No (g) Treatment services? No(h) Assisted living services? No (I) Dormitories? No (j) Counseling? No (k) Is each room and/or bed in the structure rented separately? No(l) Other? No#5 - Does each dwelling unit have its own self-contained kitchen? No, single family home#6 - Does each dwelling unit have its own bathroom? No, single family home #7 - Is there a community facility or manager�s office on site? No#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2017-06-29T00:00:00</comment_date></row><row _id="row-779g_snfn_jucq" _uuid="00000000-0000-0000-85D7-36555E03F3EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-779g_snfn_jucq"><intent_id>1208831</intent_id><project_id>997901</project_id><text_data>Service Tech will use basic hand tools to remove and install new output board, fan and switch.</text_data><comment_date>2022-02-02T00:00:00</comment_date></row><row _id="row-7gz8-fjec_uupr" _uuid="00000000-0000-0000-8E2E-E154BE560063" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7gz8-fjec_uupr"><intent_id>1037195</intent_id><project_id>907730</project_id><text_data>#1-Repair furnace; #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2020-02-10T00:00:00</comment_date></row><row _id="row-dvjs-fey3.ezgb" _uuid="00000000-0000-0000-3A8A-7A11F0DD7033" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dvjs-fey3.ezgb"><intent_id>460672</intent_id><project_id>662515</project_id><text_data>Laborer wages is for the installation of the caulking @ the masonry &amp; sidewalks.</text_data><comment_date>2011-06-14T00:00:00</comment_date></row><row _id="row-6pvp-2j8v_2uv6" _uuid="00000000-0000-0000-1ADB-A9883A77E700" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6pvp-2j8v_2uv6"><intent_id>1041254</intent_id><project_id>910030</project_id><text_data>7022697</text_data><comment_date>2020-02-26T00:00:00</comment_date></row><row _id="row-s7iy~gi4m.9r3w" _uuid="00000000-0000-0000-DE8D-D4931F8B5762" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s7iy~gi4m.9r3w"><intent_id>1022510</intent_id><project_id>899909</project_id><text_data>Eastside Fire &amp; Rescue Station #85-Irrigation Winterization WO27679</text_data><comment_date>2019-11-19T00:00:00</comment_date></row><row _id="row-ds4v-n296~7esz" _uuid="00000000-0000-0000-D928-90C92EDC6DC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ds4v-n296~7esz"><intent_id>1242538</intent_id><project_id>1018359</project_id><text_data>1 - Provide &amp; install flooring in housing unit2 - Yes - Apt3 - 1 story4 - HousingA) NoB) NoC) YesD) NoE) NoF) NoG) NoH) NoI) NoJ) NoK) No5 - Yes6 - Yes7 - No8 - No</text_data><comment_date>2022-06-20T00:00:00</comment_date></row><row _id="row-kt86-v7nc-sjuv" _uuid="00000000-0000-0000-92E9-C4FB36737CD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kt86-v7nc-sjuv"><intent_id>498532</intent_id><project_id>681997</project_id><text_data>The vehicle used for hauling landscaping debris is a single rear axle vehicle. Loading and unloading is done manually. This task falls within the scope of WAC 296-127-01346: Landscape Construction.</text_data><comment_date>2012-02-21T00:00:00</comment_date></row><row _id="row-hbp2~vn4b-ynrw" _uuid="00000000-0000-0000-3705-485DC84EA7DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hbp2~vn4b-ynrw"><intent_id>1285797</intent_id><project_id>998010</project_id><text_data>GU Job 22436Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2022-11-23T00:00:00</comment_date></row><row _id="row-v637.4juq_g6g9" _uuid="00000000-0000-0000-CD3E-011E708DA615" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v637.4juq_g6g9"><intent_id>921396</intent_id><project_id>856076</project_id><text_data>GU Job #18188Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2018-07-27T00:00:00</comment_date></row><row _id="row-h7rq.48q8-ibsd" _uuid="00000000-0000-0000-7E70-D760466BD898" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h7rq.48q8-ibsd"><intent_id>1129597</intent_id><project_id>951970</project_id><text_data>$20.00 medical, $1.65 vacation, $1.15 holiday</text_data><comment_date>2021-03-30T00:00:00</comment_date></row><row _id="row-ic9t~myrr_9akv" _uuid="00000000-0000-0000-05E5-2F7B1CBB01FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ic9t~myrr_9akv"><intent_id>614574</intent_id><project_id>725907</project_id><text_data>PERSONAL		ANCIL+	TIME	HOL	PEN 	HEALTHTOTAL	PER HR	PER HR	PER HR	PER HR$12.13	$1.37	$0.82	$1.02	$8.92</text_data><comment_date>2014-01-31T00:00:00</comment_date></row><row _id="row-g2ka-8fvf_fasb" _uuid="00000000-0000-0000-829B-159BEE6FDD69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g2ka-8fvf_fasb"><intent_id>835225</intent_id><project_id>817290</project_id><text_data>Our duties for this project were to bring playground material in our truck to the facility where everything was marked and ready for our employee (landscape construction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used</text_data><comment_date>2017-05-19T00:00:00</comment_date></row><row _id="row-39m9-7fbi_e3g8" _uuid="00000000-0000-0000-4F4E-8821F71F4AE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39m9-7fbi_e3g8"><intent_id>843294</intent_id><project_id>816067</project_id><text_data>Unsure how many installers will be assigned to this project at this time.</text_data><comment_date>2017-06-26T00:00:00</comment_date></row><row _id="row-9mcs.9dgt.e7rs" _uuid="00000000-0000-0000-08FF-8E27DD25B015" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9mcs.9dgt.e7rs"><intent_id>904856</intent_id><project_id>850833</project_id><text_data>Juliana Bucio Suarez is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be doing electrical repairs in the crawl and attic. This job meets the residential job requirements.</text_data><comment_date>2018-05-15T00:00:00</comment_date></row><row _id="row-r2zj.bhiz.efty" _uuid="00000000-0000-0000-441A-CF2963EC9782" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r2zj.bhiz.efty"><intent_id>579803</intent_id><project_id>709777</project_id><text_data>no notes</text_data><comment_date>2013-07-09T00:00:00</comment_date></row><row _id="row-5dj5_kdct~2z8e" _uuid="00000000-0000-0000-ED3A-72A187C6BD13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5dj5_kdct~2z8e"><intent_id>454015</intent_id><project_id>663654</project_id><text_data>The truck driver other will be moving equipment for us</text_data><comment_date>2011-05-10T00:00:00</comment_date></row><row _id="row-ajy3_8qft-upsj" _uuid="00000000-0000-0000-C188-000B97605B9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ajy3_8qft-upsj"><intent_id>1209819</intent_id><project_id>998522</project_id><text_data>General Labor code used per Betty Whalin account manager with L&amp;I</text_data><comment_date>2022-03-21T00:00:00</comment_date></row><row _id="row-utdw~uiza-xy9y" _uuid="00000000-0000-0000-D890-79D8B3CB2262" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utdw~uiza-xy9y"><intent_id>1165614</intent_id><project_id>975269</project_id><text_data>no contract for this location, this was a 'SPOT' job, a call in emergency</text_data><comment_date>2021-08-03T00:00:00</comment_date></row><row _id="row-cn8y~xbsd.8fir" _uuid="00000000-0000-0000-A177-C3B8BE4C525D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cn8y~xbsd.8fir"><intent_id>1229045</intent_id><project_id>1010534</project_id><text_data>Locate clean up pipe for sewer line</text_data><comment_date>2022-04-27T00:00:00</comment_date></row><row _id="row-n2q8.m6ii-byht" _uuid="00000000-0000-0000-6951-DE685A43C50A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2q8.m6ii-byht"><intent_id>775712</intent_id><project_id>797292</project_id><text_data>Other trucks includes water truck and lowboy.</text_data><comment_date>2016-07-25T00:00:00</comment_date></row><row _id="row-xata-dkf6~s4dp" _uuid="00000000-0000-0000-CAAE-1BAB10328B64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xata-dkf6~s4dp"><intent_id>868463</intent_id><project_id>834884</project_id><text_data>Ice barrier underlayment installation in valleys, approximately 20 squares</text_data><comment_date>2017-10-11T00:00:00</comment_date></row><row _id="row-g6v3.anpk-wn2x" _uuid="00000000-0000-0000-0947-EAC3593B2FCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g6v3.anpk-wn2x"><intent_id>1181792</intent_id><project_id>981340</project_id><text_data>WAI job 22201-1</text_data><comment_date>2021-09-29T00:00:00</comment_date></row><row _id="row-q3w9.uwsd_a7cy" _uuid="00000000-0000-0000-3ABC-1E962B36FE27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q3w9.uwsd_a7cy"><intent_id>916851</intent_id><project_id>855500</project_id><text_data>The contract is for regular service to certify the truck scales to WA State Weigh and Measures Specifications.This is done twice a year.We also do emergency service calls if necessary.</text_data><comment_date>2018-07-10T00:00:00</comment_date></row><row _id="row-896p_xxvs_caey" _uuid="00000000-0000-0000-8141-3D0F05933E6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-896p_xxvs_caey"><intent_id>669686</intent_id><project_id>747822</project_id><text_data>We are ONLY the landscapers. We bid the landscaping only for this project.Landscaping, irrigation, seeding, plant installation, and bark is what WE do.We do not know what else will be done because we did not bid that part of the project.Please see intent #663253 for the general contractor&amp;#39;s notes.</text_data><comment_date>2015-01-15T00:00:00</comment_date></row><row _id="row-7crv_xqxv~rfqd" _uuid="00000000-0000-0000-68A5-0CDE894DFA08" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7crv_xqxv~rfqd"><intent_id>646148</intent_id><project_id>741168</project_id><text_data>This is a KCDA Purchasing Cooperative job contract</text_data><comment_date>2014-08-06T00:00:00</comment_date></row><row _id="row-gv84~2k2t_v8rb" _uuid="00000000-0000-0000-5786-E5A6F863F121" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gv84~2k2t_v8rb"><intent_id>1187861</intent_id><project_id>984954</project_id><text_data>9871685</text_data><comment_date>2021-10-25T00:00:00</comment_date></row><row _id="row-eviw~48k4.a3uu" _uuid="00000000-0000-0000-0031-D9DB23B4E633" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eviw~48k4.a3uu"><intent_id>1255710</intent_id><project_id>1025359</project_id><text_data>9898206</text_data><comment_date>2022-08-06T00:00:00</comment_date></row><row _id="row-wkef~6rid_cbyw" _uuid="00000000-0000-0000-328E-0DC7523B008E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wkef~6rid_cbyw"><intent_id>952748</intent_id><project_id>869407</project_id><text_data>1. Install a ductless heat pump with single head. 2. Single family mobile home. 3.single story. 4. Single family home. 4A NO B NO C YES D NO E NO F NO G NO H NO I NO J NO K NO 5. YES 6. YES 7. NO 8. NO</text_data><comment_date>2018-12-31T00:00:00</comment_date></row><row _id="row-jjgr.bdkp-mig7" _uuid="00000000-0000-0000-EDBF-EDCCF20C6E8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jjgr.bdkp-mig7"><intent_id>482903</intent_id><project_id>664237</project_id><text_data>We are an Oregon company with employees residing in Oregon only.  We are not required to have an Industrial Insurance ID account.</text_data><comment_date>2011-10-11T00:00:00</comment_date></row><row _id="row-pfyk.5j5u~hgmb" _uuid="00000000-0000-0000-82F2-DB3631E63BCD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pfyk.5j5u~hgmb"><intent_id>623535</intent_id><project_id>732413</project_id><text_data>Relocate one Ethernet telecommunication wire in the lobby area of the Cancer Center</text_data><comment_date>2014-04-05T00:00:00</comment_date></row><row _id="row-s6h8~6qnx~u294" _uuid="00000000-0000-0000-2F8F-78928FB6E2A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s6h8~6qnx~u294"><intent_id>752041</intent_id><project_id>787508</project_id><text_data>Repair the existing sprinkler system components. Dig up the existing sprinkler system using hand shovels to a depth of 18&amp;quot;,  cutout the sprinkler parts and pvc pipe using a hand saw, reconnect the sprinkler line using pvc glue and backfill our trench using shovels and a hand tamper. Then replace the sod and rake up the area.</text_data><comment_date>2016-03-17T00:00:00</comment_date></row><row _id="row-gpyk_yynq~eadj" _uuid="00000000-0000-0000-9B87-FD3FD38AA944" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gpyk_yynq~eadj"><intent_id>446820</intent_id><project_id>654381</project_id><text_data>Landscaping work invalves set irrigation lines in shrub bed, plant shrubs and small trees.</text_data><comment_date>2011-03-11T00:00:00</comment_date></row><row _id="row-d4ze.a7e2-8745" _uuid="00000000-0000-0000-AB5E-443AE3392D7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d4ze.a7e2-8745"><intent_id>1003710</intent_id><project_id>885270</project_id><text_data>GU Job # 19277</text_data><comment_date>2019-08-30T00:00:00</comment_date></row><row _id="row-cc6m-fgxa.x85r" _uuid="00000000-0000-0000-CA5B-BB999AD9F8C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cc6m-fgxa.x85r"><intent_id>806584</intent_id><project_id>809098</project_id><text_data>Razz will be welding temporary brackets for scaffolding on piles, and bracing for shoring boxes.  All are temporary for ease of construction and not left on site after completion.</text_data><comment_date>2016-12-16T00:00:00</comment_date></row><row _id="row-kfmr~uhqh~7g7j" _uuid="00000000-0000-0000-3047-B74FB5B57B39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kfmr~uhqh~7g7j"><intent_id>514464</intent_id><project_id>688638</project_id><text_data>Units 1-20:1) 15706 NE Fargher Lake Hwy, Yacolt</text_data><comment_date>2012-05-31T00:00:00</comment_date></row><row _id="row-uupk-zx4w-26yn" _uuid="00000000-0000-0000-0847-30F001293C4E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uupk-zx4w-26yn"><intent_id>545964</intent_id><project_id>700303</project_id><text_data>Sent email:  On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.asp</text_data><comment_date>2012-11-30T00:00:00</comment_date></row><row _id="row-2ru7~yaqe.s9m2" _uuid="00000000-0000-0000-D81C-793B94288AA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ru7~yaqe.s9m2"><intent_id>1275444</intent_id><project_id>1035822</project_id><text_data>This Intent relates to an active Blanket Contract with SCL that was established with Original Bid date of 7/27/2016</text_data><comment_date>2022-10-17T00:00:00</comment_date></row><row _id="row-m8we.hmve-wrtb" _uuid="00000000-0000-0000-37F7-AD28792B2915" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8we.hmve-wrtb"><intent_id>729688</intent_id><project_id>735578</project_id><text_data>Fringe Breakdown:Annuity: $5.55Health &amp; Welfare: $7.02Pension: $9.95Apprenticeship: $0.67Impact: $0.30Industry: $0.02Total: $23.51</text_data><comment_date>2015-11-03T00:00:00</comment_date></row><row _id="row-853t~z24j_eg6u" _uuid="00000000-0000-0000-C8D5-8A7E5BC00E48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-853t~z24j_eg6u"><intent_id>533980</intent_id><project_id>693621</project_id><text_data>Our prime contractor (premier Excavation) told me to file through L&amp;I even though it's a federal wage job. Note that the orig. wage for federal is in the wage spot then i put in the fringe of $10.00 plus $2.00 travel zone to the fringe making a total of $12.00. so the wage plus the fringe is the actual total we will be paying our guys. there was no other spot to show the total. CT= $35.41 which is higher than L&amp;I wage so thats what I was told to pay.</text_data><comment_date>2012-09-12T00:00:00</comment_date></row><row _id="row-diew-p2vz~cth7" _uuid="00000000-0000-0000-5CEA-BDEA0B42F2E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-diew-p2vz~cth7"><intent_id>1070211</intent_id><project_id>921697</project_id><text_data>Fringe Benefit breakdown $30.29 her hour for JourneymanMedical Ins $12.77National Pension $4.24International Training $.17Northwest Sheet Metal Pension $9.50Apprentice Fund $1.10Industry Fund $.65Organizational Trust Fund $1.00Northwest Supplemental Pension Fund $.79Clean Card $.07</text_data><comment_date>2020-07-14T00:00:00</comment_date></row><row _id="row-w9a7.sypb_md7q" _uuid="00000000-0000-0000-33E3-2707FA9B38C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9a7.sypb_md7q"><intent_id>959570</intent_id><project_id>854603</project_id><text_data>Other trucks  Lowboy and Water trucks</text_data><comment_date>2019-02-08T00:00:00</comment_date></row><row _id="row-svvb~e3j5.b9yb" _uuid="00000000-0000-0000-78B9-D08394825F4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-svvb~e3j5.b9yb"><intent_id>769311</intent_id><project_id>748845</project_id><text_data>Filed by Chelsea Smith</text_data><comment_date>2016-06-20T00:00:00</comment_date></row><row _id="row-w8ss-76vi~id43" _uuid="00000000-0000-0000-89B7-EDDDFCACC31E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w8ss-76vi~id43"><intent_id>1128774</intent_id><project_id>933787</project_id><text_data>Idaho Workers Comp 618616</text_data><comment_date>2021-03-15T00:00:00</comment_date></row><row _id="row-6msc_rnqc_j44v" _uuid="00000000-0000-0000-3A6A-77A43364BA34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6msc_rnqc_j44v"><intent_id>596015</intent_id><project_id>720783</project_id><text_data>TECH Review:Subcontractor's WA License Number: TECHRR*879K1,Subcontractor's Federal Tax ID Number:46-2827472</text_data><comment_date>2013-09-26T00:00:00</comment_date></row><row _id="row-rwbz-3jtu_rnp3" _uuid="00000000-0000-0000-C0DE-A4331C07A074" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rwbz-3jtu_rnp3"><intent_id>1195666</intent_id><project_id>964585</project_id><text_data>Sound Pacific Job #2105Becker Blacktop Job #1162-21* (this intent is for our change order work only)</text_data><comment_date>2021-11-29T00:00:00</comment_date></row><row _id="row-76rq_h2zx.ffvj" _uuid="00000000-0000-0000-1CDE-A0ABCF96ABE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-76rq_h2zx.ffvj"><intent_id>691531</intent_id><project_id>760988</project_id><text_data>UGRADE EXISTING ROCKWELL SOFTWARE USED TO MONITOR STEAM PLANT TO NEW ROCKWELL FT VIEW SOFTWARE</text_data><comment_date>2015-04-29T00:00:00</comment_date></row><row _id="row-zifu-5nuk~ykjr" _uuid="00000000-0000-0000-89DE-8519CDC98DB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zifu-5nuk~ykjr"><intent_id>1064280</intent_id><project_id>921940</project_id><text_data>Remove existing fence and install High Security Fence</text_data><comment_date>2020-06-10T00:00:00</comment_date></row><row _id="row-8sd2.fy7b.znx5" _uuid="00000000-0000-0000-7F05-5A706EBC941E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8sd2.fy7b.znx5"><intent_id>573561</intent_id><project_id>712604</project_id><text_data>Abraham Luna8210 Tacoma Ave,Tacoma, WA  98408Soeun Paula761 South 38th StreetTacoma, WA  98418</text_data><comment_date>2013-06-05T00:00:00</comment_date></row><row _id="row-brhx_sye4_ph8m" _uuid="00000000-0000-0000-2F6D-A7104E7278EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brhx_sye4_ph8m"><intent_id>1052554</intent_id><project_id>916277</project_id><text_data>Blythe job# X906</text_data><comment_date>2020-04-20T00:00:00</comment_date></row><row _id="row-cqn9.v4md-p5s8" _uuid="00000000-0000-0000-E074-F54F81066559" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqn9.v4md-p5s8"><intent_id>1278258</intent_id><project_id>1037302</project_id><text_data>Tub Replacement 2. Yes 3. Two 4.a)no b)no c)yes d)no e)no f)no g)no h)no i)no j)no k)no i)no 5. yes 6. yes 7. yes 8. no</text_data><comment_date>2022-10-27T00:00:00</comment_date></row><row _id="row-v3ge-g6cu_mctj" _uuid="00000000-0000-0000-C50E-28267D9883C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v3ge-g6cu_mctj"><intent_id>745476</intent_id><project_id>775421</project_id><text_data>GENERAL LABOR WORK CONSISTS OF HAND WORK (SHOVEL WORK) NO POWER EQUIPMENT OR POWER TOOLS. OTHER TRUCKS CONSIST OF A VACCUUM TRUCK (USED FOR EXCAVATION AROUND MANHOLES AND ELECTRICAL PIPES/WIRES.</text_data><comment_date>2016-02-08T00:00:00</comment_date></row><row _id="row-uzwb-u38n.j45q" _uuid="00000000-0000-0000-B2B6-9FBA69944BAB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzwb-u38n.j45q"><intent_id>904583</intent_id><project_id>850705</project_id><text_data>Filed by John Hurt</text_data><comment_date>2018-05-14T00:00:00</comment_date></row><row _id="row-2fy4_eayy~5jvd" _uuid="00000000-0000-0000-A01B-F499079CA259" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2fy4_eayy~5jvd"><intent_id>719362</intent_id><project_id>763163</project_id><text_data>Owner may perform work as a Glazier and or Carpenter on this project.</text_data><comment_date>2015-09-08T00:00:00</comment_date></row><row _id="row-m49w~mtav~m7ez" _uuid="00000000-0000-0000-ACE3-EA9CBB41E8C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m49w~mtav~m7ez"><intent_id>728632</intent_id><project_id>766934</project_id><text_data>152119- Provide and install Cat6 cabling for voice (telephone) and data (computers).  Will run to the nearest MDF and IDF as per prints.  Terminate, test and label.  Work to be done indoors.</text_data><comment_date>2015-10-27T00:00:00</comment_date></row><row _id="row-yw42_d2vm.du9i" _uuid="00000000-0000-0000-4EC8-1B19B9DD5E21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yw42_d2vm.du9i"><intent_id>760538</intent_id><project_id>791305</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT. IT IS A SINGLE FAMILY, RESIDENTIAL DWELLING.</text_data><comment_date>2016-05-05T00:00:00</comment_date></row><row _id="row-qgya.jb8a_sxrr" _uuid="00000000-0000-0000-F07E-3525D21D0988" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qgya.jb8a_sxrr"><intent_id>600742</intent_id><project_id>722504</project_id><text_data>ICON Project #230190</text_data><comment_date>2013-10-22T00:00:00</comment_date></row><row _id="row-pag7.ya4h-3ui2" _uuid="00000000-0000-0000-5D44-97D803CEFDB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pag7.ya4h-3ui2"><intent_id>1518309</intent_id><project_id>1175722</project_id><text_data>Vacuum Truck to vacuum all contaminated materialsHaz Waste workers to clear area of all debris using shovel/rake/brooms</text_data><comment_date>2025-03-17T00:00:00</comment_date></row><row _id="row-kvmm~8cwd.5t39" _uuid="00000000-0000-0000-CEE0-718CF2B09091" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvmm~8cwd.5t39"><intent_id>1518908</intent_id><project_id>1172205</project_id><text_data>8000999</text_data><comment_date>2025-03-18T00:00:00</comment_date></row><row _id="row-z786.5va4-3yth" _uuid="00000000-0000-0000-3CF7-A6E315643ABD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z786.5va4-3yth"><intent_id>1007544</intent_id><project_id>893439</project_id><text_data>Hired By Anne Preston.Project is exempt from state prevailing wage requirements per the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with HUD Non-routine Maintenance wage requirements for the following crafts/trades/occupations:</text_data><comment_date>2019-09-16T00:00:00</comment_date></row><row _id="row-xxys.w4qd.rc5k" _uuid="00000000-0000-0000-E491-427572791BC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xxys.w4qd.rc5k"><intent_id>795350</intent_id><project_id>804717</project_id><text_data>This is a riparian restoration project. The goal is to establish native planted trees, and shrubs on a plot of ground in the vicinity of water (creek, river, pond, or lake) and to ensure the survival of native plantings.Our specific job on this project is invasives surveying. The crew walks in a pattern designed to cover an entire area, visually searching for specific invasive plants that would threaten the desired outcome of the project. The locations are noted for removal of those plants at the appropriate time.</text_data><comment_date>2016-10-12T00:00:00</comment_date></row><row _id="row-t9vs~gyqa~t3xz" _uuid="00000000-0000-0000-DDE3-40109F76856A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9vs~gyqa~t3xz"><intent_id>478334</intent_id><project_id>674514</project_id><text_data>Installation of Medium Bark at a 2&amp;quot; depth. Installed with a blower truck thru a 4&amp;quot; hose. Purpose is for beautification around plants and trees.</text_data><comment_date>2011-09-15T00:00:00</comment_date></row><row _id="row-x4dt~e9ss-mjb4" _uuid="00000000-0000-0000-8A8A-707F2393C324" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x4dt~e9ss-mjb4"><intent_id>806558</intent_id><project_id>809091</project_id><text_data>This contract is for Landscape Maintenance Services at the South Seattle Transfer Station in the City of Seattle.  This project consists of mowing, edging, trimming, weedeating, bed care, pruning and leaf fall removal from site.  Equipment to be used will be walk behind mowers, weedeaters, backpack blowers, pruning shears, buckets, rakes, and shovels on existing beds and turf areas from 9/15/2016-9/15/2017.</text_data><comment_date>2016-12-12T00:00:00</comment_date></row><row _id="row-4jk9~g5ck-ijy3" _uuid="00000000-0000-0000-D2EF-62E0EC554ED5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4jk9~g5ck-ijy3"><intent_id>1097267</intent_id><project_id>936950</project_id><text_data>Our millwrights should have been classified as plumber/pipefitters. I have made the correction, and they will be paid accordingly.  The project description is complete to my knowledge. If you are wanting a more descriptive description I will need more direction of what you are looking for. Thank you</text_data><comment_date>2020-10-27T00:00:00</comment_date></row><row _id="row-abkd~b46b-q3pr" _uuid="00000000-0000-0000-4311-03B7D90F6E51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-abkd~b46b-q3pr"><intent_id>1132349</intent_id><project_id>956235</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.</text_data><comment_date>2021-04-06T00:00:00</comment_date></row><row _id="row-5ffs~3ypq_svvn" _uuid="00000000-0000-0000-D2BD-96FF8584D658" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ffs~3ypq_svvn"><intent_id>1055592</intent_id><project_id>917799</project_id><text_data>April 15, 2020Prevailing Wage SectionDepartment of Labor &amp; IndustriesPO Box 44540Olympia, WA 98504-4540Subject:         Statement of Intent to Pay Prevailing Wages                       Project: City of Bellevue Capacitor Replacement, Bellevue, WAThis letter is intended to address our request for an exemption for prevailing wages for the subject project. The project name is as stated in the Subject line above. Our contract is with City of Bellevue who has hired us to perform professional services, specifically the task of managing capacitor replacement for the subject project. 1.    Purpose of Project:a.    The purpose of the work performed by Sigma Six Solutions is to manage capacitor replacement for the subject project.2.    Remodeling or New Construction:a.    Sigma Six�s work does not entail remodeling or construction activities or tasks; the work to be performed is only professional services in the capacity of subcontract management. The work for the City of Bellevue involves the replacement of capacitors in existing UPS (maintenance) which will be completed by Sequoyah electricians.3.    Specific Tasks Performed by Sigma Six Solutions:a.    Sequoyah craftsmen (IBEW electricians) will perform all labor and tool work associated with the capacitor replacement. Management will be performed by the Sigma Six Solutions� field engineer and will not involve any disassembly or re-assembly activity.b.    No tool work, assembly, disassembly, or any other construction craft activity will be performed by the Sigma Six field engineer. All such labor will be performed by Sequoyah electricians.c.    A Sigma Six field engineer will manage Sequoyah�s services and provide the City of Bellevue with a written report of the services performed.4.    Tools Used by Sigma Six Solutions:a.    No hand or construction tools will be used by the Sigma Six field engineer. All tool work will be performed by Sequoyah electricians as described above.Please feel free to contact me (253-333-9730) if further information or clarification is desired.Sincerely,Phillip SernaArea ManagerSigma Six Solutions</text_data><comment_date>2020-05-04T00:00:00</comment_date></row><row _id="row-d2xe-wurh-4dus" _uuid="00000000-0000-0000-59CA-4457C217959F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d2xe-wurh-4dus"><intent_id>1087735</intent_id><project_id>932481</project_id><text_data>1613516</text_data><comment_date>2020-09-14T00:00:00</comment_date></row><row _id="row-usen~x25s.n26v" _uuid="00000000-0000-0000-7B1B-9BE7787E9150" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-usen~x25s.n26v"><intent_id>1237252</intent_id><project_id>1015413</project_id><text_data>5050.210082</text_data><comment_date>2022-05-29T00:00:00</comment_date></row><row _id="row-i7ye_tz9s-ckxt" _uuid="00000000-0000-0000-5402-E99753F675FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7ye_tz9s-ckxt"><intent_id>1001665</intent_id><project_id>891058</project_id><text_data>We will install new sprinkler heads to 2' stubs already provided along a new ADA ramp at Suquamish Elementary. We will use rakes, shovels and wheelbarrows to spread 2' organic topsoil near and around ramp. On ramp we will use wheelbarrows to install, rake and spread 2' basalt rock on ramp then compact with tamper. On steeper slopes around ramp we will spread and attach jute netting for erosion control over topsoil before using our hydroseeder to cover all topsoil that was spread out around and near ramp.</text_data><comment_date>2019-08-22T00:00:00</comment_date></row><row _id="row-k248~5jym~rtea" _uuid="00000000-0000-0000-7CB7-40DDB8EA2165" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k248~5jym~rtea"><intent_id>966086</intent_id><project_id>875996</project_id><text_data>In order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2-apartment3-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- yesk- yes6- yes7- no8- no</text_data><comment_date>2019-03-19T00:00:00</comment_date></row><row _id="row-bu6j~7pts.pkgy" _uuid="00000000-0000-0000-EC0C-15923CAF3066" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bu6j~7pts.pkgy"><intent_id>1509089</intent_id><project_id>1170149</project_id><text_data>1/28 Tech: Client is going to contact their landlord to have TKE come out. They will reach out to us and make sure we can be on site at the same time as them. Reader was showing access granted, and I metered the relay on the 1320. Every time a badge was read the contact was changing states. The issue is going to be somewhere on the elevator side.  Will create a new job when client reaches back out to have TKE and our tech on site together.</text_data><comment_date>2025-02-12T00:00:00</comment_date></row><row _id="row-d2w9.rdkw.b8ni" _uuid="00000000-0000-0000-9977-903CC05E3616" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d2w9.rdkw.b8ni"><intent_id>498993</intent_id><project_id>682179</project_id><text_data>total project was to enter school property and remove scotch broom from areas designated by school contact, mostly natural areas not landscaped but with grass seed, gravel or unlandscaped areas.  Workers performed work by:  hand pulling, sometime using a pick ax if the hand pull wasn't effective or using a weed wrench (a non-mechanized tool created for pulling long rooted, woody shrubs).  After pulling, the crew carried the scotch broom shrubs and put them in the back of the pickup.  Crew never used mechanized tools or drove vechicles.  For a small portion of area, crew shoveled mulch onto the ground disturbed by removal.  Not more than a few inches in each area.  Total yards of mulch used wasn't more than 3.</text_data><comment_date>2012-02-09T00:00:00</comment_date></row><row _id="row-t67q~w8y9-hv4m" _uuid="00000000-0000-0000-019B-9F01431A25CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t67q~w8y9-hv4m"><intent_id>1179833</intent_id><project_id>980497</project_id><text_data>S21-050</text_data><comment_date>2021-09-22T00:00:00</comment_date></row><row _id="row-mqa9-ctwy_fy4x" _uuid="00000000-0000-0000-D0C1-D631FFB67D23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mqa9-ctwy_fy4x"><intent_id>1097857</intent_id><project_id>942861</project_id><text_data>Updated for job 56935-1</text_data><comment_date>2021-01-14T00:00:00</comment_date></row><row _id="row-33m2_8gr6~92vy" _uuid="00000000-0000-0000-E53C-86DDD2C99ED7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-33m2_8gr6~92vy"><intent_id>622931</intent_id><project_id>732156</project_id><text_data>Form filed by: Randy Guimond</text_data><comment_date>2014-04-02T00:00:00</comment_date></row><row _id="row-mpjs_qxz4~qggc" _uuid="00000000-0000-0000-F733-56E9FD89BED1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpjs_qxz4~qggc"><intent_id>783028</intent_id><project_id>793591</project_id><text_data>Filed by Micky Denke</text_data><comment_date>2016-08-17T00:00:00</comment_date></row><row _id="row-n2va~gyua.9728" _uuid="00000000-0000-0000-163F-9BC0B11D27F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2va~gyua.9728"><intent_id>787622</intent_id><project_id>801832</project_id><text_data>A) Notice to Proceed clarifies repairs to Administrative Building Roof.B) Repair the roof on the Administrative Building.C) Jobsite cleanup on the ground with broom and magnet sweeper.</text_data><comment_date>2016-09-14T00:00:00</comment_date></row><row _id="row-87ri-gtnc.piyd" _uuid="00000000-0000-0000-3CCB-1527B55D4B62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87ri-gtnc.piyd"><intent_id>679847</intent_id><project_id>755326</project_id><text_data>Form filed by:  Mike Slattery</text_data><comment_date>2015-02-18T00:00:00</comment_date></row><row _id="row-c5ss_ys9b_gi3s" _uuid="00000000-0000-0000-ADA3-B99D346BE9A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c5ss_ys9b_gi3s"><intent_id>727076</intent_id><project_id>774889</project_id><text_data>Saybr Contractors Inc. is the prime contractor.  This is a Job Order Contract for Washington State Department of Enterprise.Contract # 2014-034G Work Order #91Project # 2015-622 Contract #C16-044</text_data><comment_date>2015-10-19T00:00:00</comment_date></row><row _id="row-5u29_7zjg.prsw" _uuid="00000000-0000-0000-F067-B6EDE51A69A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5u29_7zjg.prsw"><intent_id>1205541</intent_id><project_id>995822</project_id><text_data>0422006</text_data><comment_date>2022-01-19T00:00:00</comment_date></row><row _id="row-fz97~vnda.gg36" _uuid="00000000-0000-0000-8371-414955FD045E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fz97~vnda.gg36"><intent_id>1084022</intent_id><project_id>930424</project_id><text_data>Other Truck is when they MOB equipment and per Union guidelines they are paid a higher rate</text_data><comment_date>2020-09-10T00:00:00</comment_date></row><row _id="row-a6mr-iq3f.6qbm" _uuid="00000000-0000-0000-C419-86DC258D3149" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a6mr-iq3f.6qbm"><intent_id>567762</intent_id><project_id>710222</project_id><text_data>Install (2) 4-plex wall outlet locations in Records Storage Room C218. Install (2) 1-plex ceiling outlet locations in office C223.</text_data><comment_date>2013-05-03T00:00:00</comment_date></row><row _id="row-hmjg_m38j_93xe" _uuid="00000000-0000-0000-EA23-AC098F396C81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hmjg_m38j_93xe"><intent_id>834590</intent_id><project_id>821968</project_id><text_data>Job #110853-001</text_data><comment_date>2017-05-17T00:00:00</comment_date></row><row _id="row-kqti~u4xw-iku4" _uuid="00000000-0000-0000-F658-EBA340709E13" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kqti~u4xw-iku4"><intent_id>1211572</intent_id><project_id>999594</project_id><text_data>WO #375112, 378454</text_data><comment_date>2022-02-15T00:00:00</comment_date></row><row _id="row-pt7s_mdzt_wypx" _uuid="00000000-0000-0000-C72A-53BAB1EFEB59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pt7s_mdzt_wypx"><intent_id>711683</intent_id><project_id>768059</project_id><text_data>Our scope of work includes tree protection, Topsoil @ 2&amp;quot; depth, sod installation and hydroseeding.</text_data><comment_date>2015-08-03T00:00:00</comment_date></row><row _id="row-2dwm.8qx8-hbif" _uuid="00000000-0000-0000-CE2B-B7FF9FAD86A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2dwm.8qx8-hbif"><intent_id>1368525</intent_id><project_id>1089924</project_id><text_data>9926949</text_data><comment_date>2023-10-01T00:00:00</comment_date></row><row _id="row-n2bh_8uak.um26" _uuid="00000000-0000-0000-3A90-28EE517571C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2bh_8uak.um26"><intent_id>1012954</intent_id><project_id>842015</project_id><text_data>Wade Stark2216 Appleside Blvd #BClarkstonPO# 46653We are an Idaho based business for Industrial Insurance.</text_data><comment_date>2019-10-08T00:00:00</comment_date></row><row _id="row-3wty-zezd~afzu" _uuid="00000000-0000-0000-D1B7-3BAAC4E287BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3wty-zezd~afzu"><intent_id>1028886</intent_id><project_id>864359</project_id><text_data>***This form is being approved on the basis of your statement that your employees will perform professional electrical testing services using portable test equipment and will perform no tasks which require the use of hand or construction tools which are considered the work of a laborer, worker, or mechanic within the meaning of the prevailing wage laws. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2019-12-30T00:00:00</comment_date></row><row _id="row-e6sz~rvyg.6sg6" _uuid="00000000-0000-0000-2DCA-32481BF723B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e6sz~rvyg.6sg6"><intent_id>608784</intent_id><project_id>725774</project_id><text_data>Furnace repair, replaced transformer</text_data><comment_date>2013-12-17T00:00:00</comment_date></row><row _id="row-vawg~ze36-kwqv" _uuid="00000000-0000-0000-D53E-4E504C6A6857" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vawg~ze36-kwqv"><intent_id>530419</intent_id><project_id>664867</project_id><text_data>Edison Pension = $4.05District 9 Pension = $3.15Health &amp; Welfare = $8.30Apprentice Training = $.60Flex Plan = $1.20</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-k45n~78ij-jmmg" _uuid="00000000-0000-0000-0D05-F8F58794ACD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k45n~78ij-jmmg"><intent_id>1259505</intent_id><project_id>1027303</project_id><text_data>Type and size of Truck:  2011  Ford F750 Purpose:  Wood Chip truck</text_data><comment_date>2022-10-20T00:00:00</comment_date></row><row _id="row-zicm~6pqy-jdhf" _uuid="00000000-0000-0000-ABC8-F2EB23DDA0C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zicm~6pqy-jdhf"><intent_id>749418</intent_id><project_id>786371</project_id><text_data>Other Trucks - Water Truck - 3,000 to 5,000 gallon (approx) capacity.  Purpose is to supply water to the job site for use in compacting backfill in the trenches.</text_data><comment_date>2016-03-08T00:00:00</comment_date></row><row _id="row-9cm2_gw4d_mxrk" _uuid="00000000-0000-0000-B46C-716C518295A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9cm2_gw4d_mxrk"><intent_id>1269781</intent_id><project_id>1032775</project_id><text_data>sr53098654</text_data><comment_date>2022-09-27T00:00:00</comment_date></row><row _id="row-5mzg-w29g.mq46" _uuid="00000000-0000-0000-5EE1-BB2957213EAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5mzg-w29g.mq46"><intent_id>600865</intent_id><project_id>722544</project_id><text_data>Add eternet telephone wire to the workstation in Cardiac Services Testing room inside the building.</text_data><comment_date>2013-10-22T00:00:00</comment_date></row><row _id="row-a6em~rdgs.9e5u" _uuid="00000000-0000-0000-C936-3F831B0A412B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a6em~rdgs.9e5u"><intent_id>1191742</intent_id><project_id>987141</project_id><text_data>sr49882006</text_data><comment_date>2021-11-08T00:00:00</comment_date></row><row _id="row-dyjc~rsg6.qgie" _uuid="00000000-0000-0000-B58E-3CA3037C20AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dyjc~rsg6.qgie"><intent_id>826379</intent_id><project_id>818036</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.</text_data><comment_date>2017-04-13T00:00:00</comment_date></row><row _id="row-wxu4_z257~wstg" _uuid="00000000-0000-0000-2510-6CC8B67320FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wxu4_z257~wstg"><intent_id>1244726</intent_id><project_id>1012492</project_id><text_data>Notes from the client -  The whole project  is a pretty broad scope beyond the plumbing and not really relevant to this labor request. Tradesmen's part of the project is We are the plumbing contractor performing the Division 22 Plumbing Scope of Work.?The provided journeymen and apprentice plumbers by Tradesmen International (as applicable) will be expected to perform commercial plumbing work as detailed in the Division 22 Specifications and corresponding Project Plans attached. It is a typical best-practice for plumbers to provide basic hand tools to accomplish their work; IE: Plumbing Level, crescent wrenches, channel lock plyers, and basic cordless power tools. Any specialty tools are provided by MIBRE CO.</text_data><comment_date>2022-07-14T00:00:00</comment_date></row><row _id="row-xuyb.tnxf.7y4b" _uuid="00000000-0000-0000-A3FB-B74AEF3FFD5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xuyb.tnxf.7y4b"><intent_id>691199</intent_id><project_id>757926</project_id><text_data>The Landscaping is for a school remodel project. We will install the irrigation system; planting shrubs and trees; fabric, and rock. Using hand tools such as shovels, rakes, pipe cutters &amp; etc. Equipment was under the 90 HP � mini excavator to trench &amp; a small skit steer to carry trees and materials.</text_data><comment_date>2015-04-27T00:00:00</comment_date></row><row _id="row-44sj-g3xu~be36" _uuid="00000000-0000-0000-52E1-864BB56B0405" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-44sj-g3xu~be36"><intent_id>619651</intent_id><project_id>730636</project_id><text_data>Several manufactured homes within the Whispering Pines MHP		#1 - Heating duct sealing. #2 - Single family manufactured home? #3 - 1 level? #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - Unknown #8 - No</text_data><comment_date>2014-03-11T00:00:00</comment_date></row><row _id="row-jpt3.nnzc.uv38" _uuid="00000000-0000-0000-505B-D6B812AFD408" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jpt3.nnzc.uv38"><intent_id>613680</intent_id><project_id>725050</project_id><text_data>Operator will apply lime to landfill fill using a F-550 truck with spreader box.</text_data><comment_date>2014-01-25T00:00:00</comment_date></row><row _id="row-dvyi.z26m_pdvm" _uuid="00000000-0000-0000-2284-0839C8AA210C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dvyi.z26m_pdvm"><intent_id>621694</intent_id><project_id>704635</project_id><text_data>-----Original Message-----From: ronald reding [mailto:roninstall@comcast.net] Sent: Wednesday, April 09, 2014 1:49 PMTo: Herman, Laura E (LNI); Christine.Wulfert@Mortenson.com; Meriann BograndSubject: Intent notes    Laura Herman;         Please add a note to my Intent Id# 621694;  &amp;quot;This intent is for bid Package #_108.&amp;quot;       Thank you;    Ronald D Reding    Ron's construction Services Inc.    Acct. #864,490-01</text_data><comment_date>2014-04-09T00:00:00</comment_date></row><row _id="row-ap9t_x9he-rj5p" _uuid="00000000-0000-0000-64D1-C1046F07CF1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ap9t_x9he-rj5p"><intent_id>579549</intent_id><project_id>709774</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-07-15T00:00:00</comment_date></row><row _id="row-ww4k~gi58-grud" _uuid="00000000-0000-0000-5975-9446DDF2ED2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ww4k~gi58-grud"><intent_id>558580</intent_id><project_id>704777</project_id><text_data>All cabling is inside the building, and the nature of the scope is to provide data locations and data connectivity.</text_data><comment_date>2013-03-05T00:00:00</comment_date></row><row _id="row-pz8f~qawd-4qir" _uuid="00000000-0000-0000-3A5C-C61892DA72F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pz8f~qawd-4qir"><intent_id>1105061</intent_id><project_id>898450</project_id><comment_date>2020-11-20T00:00:00</comment_date></row><row _id="row-g42h-m8n2.nmf7" _uuid="00000000-0000-0000-DA3B-441002EA9BFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g42h-m8n2.nmf7"><intent_id>721640</intent_id><project_id>772765</project_id><text_data>Filed by R.T Vatne</text_data><comment_date>2015-09-18T00:00:00</comment_date></row><row _id="row-5z63~7pqx.dm9g" _uuid="00000000-0000-0000-630F-C408D4ACE3C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5z63~7pqx.dm9g"><intent_id>571058</intent_id><project_id>711617</project_id><text_data>Employees under the jackhammer category will be drilling holes in concrete to insert a nozzle into to pump the mud under the slab. General Laborers will be preparing the equipment, inserting the nozzle into the holes, and pumping the mud.</text_data><comment_date>2013-05-22T00:00:00</comment_date></row><row _id="row-b3ff~8hk6~zigq" _uuid="00000000-0000-0000-03AC-942FD8EB1FBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b3ff~8hk6~zigq"><intent_id>1170051</intent_id><project_id>975529</project_id><text_data>SPLICE AND REPAIR EXISTING 24 STRAND AT DAMAGED TYPE 2 HAND HOLE SM FOC ON NE 124TH ST.</text_data><comment_date>2021-08-18T00:00:00</comment_date></row><row _id="row-fhr6~685q_cevr" _uuid="00000000-0000-0000-8A3D-0411ADA78ED5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fhr6~685q_cevr"><intent_id>791340</intent_id><project_id>802452</project_id><text_data>Sheila Sedgwick55 W Washington Ave #168Yakima,WA 98903#1 Replace bath fan. #2 Single family mobile home. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2016-09-23T00:00:00</comment_date></row><row _id="row-knbw~r9tn~i5m5" _uuid="00000000-0000-0000-559C-BB9E6617843D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-knbw~r9tn~i5m5"><intent_id>1117005</intent_id><project_id>946516</project_id><text_data>Concrete portion of work only</text_data><comment_date>2021-01-22T00:00:00</comment_date></row><row _id="row-v6pr.rrmu~r8wj" _uuid="00000000-0000-0000-F20C-1DD31CA21CD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v6pr.rrmu~r8wj"><intent_id>624358</intent_id><project_id>732796</project_id><text_data>Job # C10311</text_data><comment_date>2014-04-10T00:00:00</comment_date></row><row _id="row-d532.pgry~mcbx" _uuid="00000000-0000-0000-BD04-912DCC69484F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d532.pgry~mcbx"><intent_id>992060</intent_id><project_id>878152</project_id><text_data>HIRED BY JEM CONTRACTORS</text_data><comment_date>2019-07-16T00:00:00</comment_date></row><row _id="row-hj9s_saej-uwpp" _uuid="00000000-0000-0000-DBE8-E7A79E64F85F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hj9s_saej-uwpp"><intent_id>976522</intent_id><project_id>879863</project_id><text_data>Please note that Employer only will be laying the the 95' x 14' flagstone path. Employees will perform work only on the landscape portion of the project.</text_data><comment_date>2019-06-13T00:00:00</comment_date></row><row _id="row-8vwy.nf4d~eg7p" _uuid="00000000-0000-0000-74DB-57534BCCAEE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8vwy.nf4d~eg7p"><intent_id>749575</intent_id><project_id>786447</project_id><text_data>Job Order Contract RTA/CN 0008-13, Contract Purchase Order No. 141074 OBWork Order No. 064 Sound Transit</text_data><comment_date>2016-03-03T00:00:00</comment_date></row><row _id="row-a4vr~aq5m-5ds3" _uuid="00000000-0000-0000-3B52-649244DA66C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a4vr~aq5m-5ds3"><intent_id>1111675</intent_id><project_id>941904</project_id><text_data>Work performed by the Telecommunication Technicians is installing Category 6 cabling for voice and data indoors. POWERCOM JOB# 451467</text_data><comment_date>2020-12-23T00:00:00</comment_date></row><row _id="row-dpdz_grsr~rwqi" _uuid="00000000-0000-0000-12A3-6604D55CC09B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpdz_grsr~rwqi"><intent_id>794670</intent_id><project_id>804480</project_id><text_data>One laborer is an apprentice &amp; the one carpenter is 50% owner of the company (Paradigm).</text_data><comment_date>2016-10-07T00:00:00</comment_date></row><row _id="row-r6x3_dzrv_ifbe" _uuid="00000000-0000-0000-02F8-F4D60A2AA89D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r6x3_dzrv_ifbe"><intent_id>929969</intent_id><project_id>855695</project_id><text_data>Filed by Fred Zittleman</text_data><comment_date>2018-08-31T00:00:00</comment_date></row><row _id="row-7bzr.8w9s_2sd2" _uuid="00000000-0000-0000-2B59-CC8084C5740D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7bzr.8w9s_2sd2"><intent_id>1209344</intent_id><project_id>998229</project_id><text_data>303605</text_data><comment_date>2022-02-04T00:00:00</comment_date></row><row _id="row-cq8u~5kaa-6593" _uuid="00000000-0000-0000-1AD8-342977FD6AE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cq8u~5kaa-6593"><intent_id>1049458</intent_id><project_id>910612</project_id><text_data>FRINGE BREAKDOWN LABORERS: $13.10H &amp; W  = $6.50Pension= $5.60                                                                                             Training= $0.90Trust     = $0.10 OPERATORS: $17.30H &amp; W  = $7.70Pension= $8.85Training= $0.75 TEAMSTERS: $17.77H &amp; W  = $10.30Pension= $ 6.95Training= $ 0.52</text_data><comment_date>2020-04-03T00:00:00</comment_date></row><row _id="row-cr5e-md4r-bhe2" _uuid="00000000-0000-0000-C983-AC73666DA1B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cr5e-md4r-bhe2"><intent_id>1245169</intent_id><project_id>1019849</project_id><text_data>COB Irrigation repair to existing irrigation system at Bridle Trails Corner Park By Steve Ladd. This job to be complete at Time and Materials</text_data><comment_date>2022-06-29T00:00:00</comment_date></row><row _id="row-t6mn-92pb.n6p8" _uuid="00000000-0000-0000-F341-67772532E02C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t6mn-92pb.n6p8"><intent_id>1250125</intent_id><project_id>1022469</project_id><text_data>Pioneer Middle School50 E Spencer Lake RdShelton, WA 98584Invoice 35408764</text_data><comment_date>2022-07-19T00:00:00</comment_date></row><row _id="row-qmp6-wkwa_nb9m" _uuid="00000000-0000-0000-40B4-7C6A84961710" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qmp6-wkwa_nb9m"><intent_id>844594</intent_id><project_id>825984</project_id><text_data>Install new cables that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-06-30T00:00:00</comment_date></row><row _id="row-34ps_pk93-e4nc" _uuid="00000000-0000-0000-40A8-2E1C77BFDB4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-34ps_pk93-e4nc"><intent_id>841158</intent_id><project_id>824621</project_id><text_data>Job #112194-001</text_data><comment_date>2017-06-16T00:00:00</comment_date></row><row _id="row-94p9~pgb9_3brt" _uuid="00000000-0000-0000-8A71-3003BD69639B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-94p9~pgb9_3brt"><intent_id>840906</intent_id><project_id>824515</project_id><text_data>1)We were contracted to replace the furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2017-06-15T00:00:00</comment_date></row><row _id="row-gcsc-zxhc.6dmf" _uuid="00000000-0000-0000-C116-2F124A0D17E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcsc-zxhc.6dmf"><intent_id>659829</intent_id><project_id>704980</project_id><text_data>We are a rental company and will be supplying rental equipment</text_data><comment_date>2014-10-13T00:00:00</comment_date></row><row _id="row-jakq_kbe9-mwap" _uuid="00000000-0000-0000-114E-3628AEEACE10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jakq_kbe9-mwap"><intent_id>799401</intent_id><project_id>800826</project_id><text_data>HIRED BY SUB SHORELINE CONSTRUCTION</text_data><comment_date>2016-11-02T00:00:00</comment_date></row><row _id="row-hbpf~8s6p~52h5" _uuid="00000000-0000-0000-A001-F37427F384B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hbpf~8s6p~52h5"><intent_id>748833</intent_id><project_id>786092</project_id><text_data>Other Truck:4000 gallon on road. Water truck use for dust control and compaction.</text_data><comment_date>2016-02-27T00:00:00</comment_date></row><row _id="row-hk4k~krae.knvp" _uuid="00000000-0000-0000-11DA-35A9A75FFA23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hk4k~krae.knvp"><intent_id>746163</intent_id><project_id>772986</project_id><text_data>Filed by Brad Biggerstaff</text_data><comment_date>2016-02-11T00:00:00</comment_date></row><row _id="row-b6pu-nnuj.xq5i" _uuid="00000000-0000-0000-C266-175DCBC9A0CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b6pu-nnuj.xq5i"><intent_id>710443</intent_id><project_id>764665</project_id><text_data>We are a tribally insured entity.</text_data><comment_date>2015-07-28T00:00:00</comment_date></row><row _id="row-mrqt~7esh_mer2" _uuid="00000000-0000-0000-2E26-43FFBEBEC7BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrqt~7esh_mer2"><intent_id>1065133</intent_id><project_id>913844</project_id><text_data>WE ARE A SUPPLIER AND WILL HAVE NO EMPLOYEES ON THE JOB</text_data><comment_date>2020-06-18T00:00:00</comment_date></row><row _id="row-2u9x~k34g-mp8r" _uuid="00000000-0000-0000-F7EE-52EE0533317C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2u9x~k34g-mp8r"><intent_id>1260052</intent_id><project_id>1000446</project_id><comment_date>2022-08-22T00:00:00</comment_date></row><row _id="row-e6na~ptbi-vv2b" _uuid="00000000-0000-0000-5BD3-DC8346ED85CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e6na~ptbi-vv2b"><intent_id>468908</intent_id><project_id>663303</project_id><text_data>General Laborer - jobsite cleanup, raising utilities, patchingEquipment - coring machine, shovel, hand tampVehicle - Pickup</text_data><comment_date>2011-08-16T00:00:00</comment_date></row><row _id="row-5e6w~cgg8.r6cf" _uuid="00000000-0000-0000-7B42-823A28E21EAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5e6w~cgg8.r6cf"><intent_id>1069954</intent_id><project_id>924399</project_id><text_data>Deckhand to put boat on trailer and dispose</text_data><comment_date>2020-07-06T00:00:00</comment_date></row><row _id="row-jwhb_6jjh-i7bz" _uuid="00000000-0000-0000-C653-B889F215A40B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jwhb_6jjh-i7bz"><intent_id>625039</intent_id><project_id>733043</project_id><text_data>Melissa Rogers is a single family home, the home has a kitchen and at least one bathroom. The building is no more than one story in height. This home does not have a business and is not open to the public. The electricians will be installing two new bathroom fans. This job meets the residential job requirements.</text_data><comment_date>2014-04-15T00:00:00</comment_date></row><row _id="row-k3t8_3s88.kjsp" _uuid="00000000-0000-0000-E41D-7A72E78D9F53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3t8_3s88.kjsp"><intent_id>551596</intent_id><project_id>702899</project_id><text_data>2nd year continuation 2 year contract, same as year 1 intent ID 493920</text_data><comment_date>2013-01-11T00:00:00</comment_date></row><row _id="row-f357-vzyg~986u" _uuid="00000000-0000-0000-53DF-E4922B3687B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f357-vzyg~986u"><intent_id>979769</intent_id><project_id>881942</project_id><text_data>General labor work consists of hand work (shovel work) no power equipment or power tools. Motor Patrol grader is a non-finish blade used for grading the project site for compaction before paving and/or chip sealing operations. Other trucks consist of one (1) 0-8,000 gallon water truck used for distribution of water during the grading process to help with compaction before paving/chip sealing operations.</text_data><comment_date>2019-05-22T00:00:00</comment_date></row><row _id="row-utzj~jtkd.cpjt" _uuid="00000000-0000-0000-1360-04ED75B5FD01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-utzj~jtkd.cpjt"><intent_id>1141014</intent_id><project_id>960375</project_id><text_data>Please have the award date switched to 04-28-21. This was an automated intent set up with prefilled info of bid date and award dates set in place.</text_data><comment_date>2021-05-11T00:00:00</comment_date></row><row _id="row-x3qt.xedr_awbv" _uuid="00000000-0000-0000-AEA5-B66AEB34BB50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x3qt.xedr_awbv"><intent_id>1055338</intent_id><project_id>911027</project_id><text_data>GENERAL LABORER:  PERFORMS FINAL CLEANUP AFTER THE CONSTRUCTION HAS BEEN COMPLETED. TOOLS: SHOVELS.TRK DRIVER/OTHER: WATER TRUCKS WHICH HOLD UP TO 4000 GAL OF WATER. USED FOR DUST CONTROL AND COMPACTION.</text_data><comment_date>2020-05-01T00:00:00</comment_date></row><row _id="row-phcd_xneh.ahaj" _uuid="00000000-0000-0000-4389-4D8B7A4577E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-phcd_xneh.ahaj"><intent_id>500694</intent_id><project_id>681214</project_id><text_data>penhall job # 230679</text_data><comment_date>2012-02-16T00:00:00</comment_date></row><row _id="row-t4ej~66ih_cxt8" _uuid="00000000-0000-0000-7C01-DF510F4EFC71" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t4ej~66ih_cxt8"><intent_id>617256</intent_id><project_id>728756</project_id><text_data>Filed By: Kim Burnside</text_data><comment_date>2014-02-21T00:00:00</comment_date></row><row _id="row-brki~hb9e~ewtb" _uuid="00000000-0000-0000-1B70-26816BC0716A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-brki~hb9e~ewtb"><intent_id>753131</intent_id><project_id>788021</project_id><text_data>Ashley - Furman Ave, Langley1. Air seal, mechanical ventilation	2. Single family			3. 1			4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No			5. Yes			6. Yes			7. No			8. No</text_data><comment_date>2016-03-24T00:00:00</comment_date></row><row _id="row-c542_7hgb.vs9b" _uuid="00000000-0000-0000-F919-4930DAFCCD66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c542_7hgb.vs9b"><intent_id>1017212</intent_id><project_id>896913</project_id><text_data>THIRD FLOOR OFFICE IN HQ (N339) HAS A WORKING JACK (3879) ON THE WEST WALL THAT IF POSSIBLE, CAN BE MOVED TO THE EAST WALL WHERE JACK 3713 IS. 3713 USED TO HAVE DATA SO I�M NOT SURE IF IT WAS MOVED TO 3879 SOMEWHAT RECENTLY AND CAN BE MOVED BACK TO 3713 OR IF A WHOLE NEW RUN IS NEEDED. DIAGRAM BELOW SHOWS WHERE THE 2 JACKS ARE LOCATED.</text_data><comment_date>2019-10-23T00:00:00</comment_date></row><row _id="row-fe7b_i6af~utr4" _uuid="00000000-0000-0000-1D20-5D4C06ECAF94" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fe7b_i6af~utr4"><intent_id>1006851</intent_id><project_id>893139</project_id><text_data>0819103</text_data><comment_date>2019-09-13T00:00:00</comment_date></row><row _id="row-tyqm_b4k9~vp5i" _uuid="00000000-0000-0000-2E22-7E11A1F22B37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tyqm_b4k9~vp5i"><intent_id>1501308</intent_id><project_id>1165360</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12).L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates. The use of on-call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work. Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members.</text_data><comment_date>2025-02-13T00:00:00</comment_date></row><row _id="row-9i99_8c8k-m5hd" _uuid="00000000-0000-0000-3623-A87D0F2272D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9i99_8c8k-m5hd"><intent_id>593362</intent_id><project_id>712019</project_id><text_data>Our portion of the project is to apply hydroseed to designated and prepared areas for the purpose of erosion control - using a hydroseed installation truck. Hydroseed is a one-step process.</text_data><comment_date>2013-09-12T00:00:00</comment_date></row><row _id="row-664u.m89v~p72b" _uuid="00000000-0000-0000-FBD8-DBB01E6F01A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-664u.m89v~p72b"><intent_id>620301</intent_id><project_id>730948</project_id><text_data>Project location covers Roosevelt Elementary School at 110 N 16th Ave Yakima, WA 98901, Eisenhower Sr High School at 702 S 40th Ave Yakima, WA 98903, Davis Sr. High School at 212 S 6th Ave Yakima, WA 98901, Franklin Jr High School at 410 S 19th Ave Yakima, WA 98901, Martin Luther King Elementary School at 2000 S 18th St Union Gap WA 98903, Ridgeview Elementary School at 609 W Washington Ave Yakima, WA 98901, Adams Elementary School at 723 S 8th St Yakima, WA 98901, Washington Middle School at 507 South 7th St Yakima, WA 98901, Wilson Middle School at 902 South 44th Yakima, WA 98908, and Yakima Valley Tech Skills Center at 1120 18th St Yakima, WA 98901.</text_data><comment_date>2014-03-14T00:00:00</comment_date></row><row _id="row-nvjf_s4qq-whqj" _uuid="00000000-0000-0000-88C4-2DCA4FAF8C72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nvjf_s4qq-whqj"><intent_id>861639</intent_id><project_id>816740</project_id><text_data>Semi-Tractor with trailer.  Trailer is 20 CY Side Dump</text_data><comment_date>2017-09-08T00:00:00</comment_date></row><row _id="row-zv6y~p6sr_e65z" _uuid="00000000-0000-0000-24E8-7DB01CC2BFF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zv6y~p6sr_e65z"><intent_id>600904</intent_id><project_id>714101</project_id><text_data>Chinook Hydroseeding is hydroseeding contractor.  We applied 2000 lbs of mulch per acre. The mulch had seed and fertilizer within the fiber.  The only activity we were contracted to complete was the hydroseeding.  We used a 1500 gallon hydroseeding unit. We moved no dirt, installed no irrigation, and dug no trenches.  If the reviewer of this description is unfamiliar with the process of hydroseeding please call me for clarification.  Larry @ 360-888-7301</text_data><comment_date>2013-12-10T00:00:00</comment_date></row><row _id="row-j79g.7ejt~ehtm" _uuid="00000000-0000-0000-A9EA-6CA9CCC99212" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j79g.7ejt~ehtm"><intent_id>989390</intent_id><project_id>886256</project_id><text_data>Truck Driver-Other - Freightliner to haul modular building</text_data><comment_date>2019-07-03T00:00:00</comment_date></row><row _id="row-5d9s~i9xe.waxt" _uuid="00000000-0000-0000-549A-7B087F3AA31C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5d9s~i9xe.waxt"><intent_id>523427</intent_id><project_id>691988</project_id><text_data>Form filed by: Dave Ritchie</text_data><comment_date>2012-07-19T00:00:00</comment_date></row><row _id="row-gfz5-i7r2.c3q8" _uuid="00000000-0000-0000-003F-089BF45DC76C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfz5-i7r2.c3q8"><intent_id>599126</intent_id><project_id>721916</project_id><text_data>Filed by Blair McBride.</text_data><comment_date>2013-10-14T00:00:00</comment_date></row><row _id="row-3i52-9vek-3674" _uuid="00000000-0000-0000-6771-BE4A238D3030" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3i52-9vek-3674"><intent_id>527994</intent_id><project_id>690837</project_id><text_data>Breakdown as follows:Health &amp; security - $7.55Pension - $7.65Apprentice / Training - $.70</text_data><comment_date>2012-08-15T00:00:00</comment_date></row><row _id="row-r7rp-awqg-mwnw" _uuid="00000000-0000-0000-A38B-53DE42B58DA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r7rp-awqg-mwnw"><intent_id>599364</intent_id><project_id>721996</project_id><text_data>Outside Line Construction by Lane Communications.</text_data><comment_date>2013-10-15T00:00:00</comment_date></row><row _id="row-9dpn-utgh-k5nh" _uuid="00000000-0000-0000-FA0A-F3C9264086E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9dpn-utgh-k5nh"><intent_id>836857</intent_id><project_id>817040</project_id><text_data>Installation of low-voltage telecommunications cabling inside portable classrooms for the purpose of networking personal computers.</text_data><comment_date>2017-05-30T00:00:00</comment_date></row><row _id="row-u35p~ycgz-mfi3" _uuid="00000000-0000-0000-4582-A02A2957BFCD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u35p~ycgz-mfi3"><intent_id>835448</intent_id><project_id>822331</project_id><text_data>Installation of indoor telephone telecommunications cabling</text_data><comment_date>2017-05-22T00:00:00</comment_date></row><row _id="row-5myq_36e5.jur4" _uuid="00000000-0000-0000-D9D7-0E1521F2CBEE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5myq_36e5.jur4"><intent_id>899729</intent_id><project_id>840001</project_id><text_data>Filed by Robert T HawkWalsh Construction is building a low income housing building. Our part in this project is creating planting beds, adding top soil, plants, mulch and 14 rocks with irrigation for ground cover plants. We are also creating a play area with hydroseeded lawn, 11 pavers, small wooden stumps and wood chips. The equipment we will be using: a bobcat, mini backhoe, and hand tools. We are doing the landscaping. We do not have any employees at this time.</text_data><comment_date>2018-04-19T00:00:00</comment_date></row><row _id="row-vx3c~ce6q~5mf3" _uuid="00000000-0000-0000-C7A6-3E52C3050230" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vx3c~ce6q~5mf3"><intent_id>865018</intent_id><project_id>828903</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2017-09-26T00:00:00</comment_date></row><row _id="row-6ciu.atis-mbw2" _uuid="00000000-0000-0000-8CB6-0092CC7E206A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ciu.atis-mbw2"><intent_id>992241</intent_id><project_id>881664</project_id><text_data>Replace existing irrigation controllers with New controllers at four elementary schools</text_data><comment_date>2019-07-16T00:00:00</comment_date></row><row _id="row-k27y-48b4_ywxd" _uuid="00000000-0000-0000-4DF8-9B1453DDA3D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k27y-48b4_ywxd"><intent_id>1151634</intent_id><project_id>966160</project_id><text_data>Inv #27926 - South Library - Check ValveInv #27808 - Fire Station #1 - Controls</text_data><comment_date>2021-06-10T00:00:00</comment_date></row><row _id="row-n94k~m2fd.txk7" _uuid="00000000-0000-0000-A079-098F71EF46CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n94k~m2fd.txk7"><intent_id>448597</intent_id><project_id>663136</project_id><text_data>Industrial Insurance Account Id: 995,735-01</text_data><comment_date>2011-04-06T00:00:00</comment_date></row><row _id="row-wrh6~dpgb.w293" _uuid="00000000-0000-0000-406A-6DA863C1ED3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wrh6~dpgb.w293"><intent_id>449928</intent_id><project_id>663685</project_id><text_data>Industrial Insurance Account Id: 434,980-01</text_data><comment_date>2011-04-12T00:00:00</comment_date></row><row _id="row-gysw-hz3h.5m3k" _uuid="00000000-0000-0000-BDDF-0B474418F0E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gysw-hz3h.5m3k"><intent_id>1253854</intent_id><project_id>1024386</project_id><text_data>We are not plumbers.</text_data><comment_date>2022-08-01T00:00:00</comment_date></row><row _id="row-mctf_wum6~zesk" _uuid="00000000-0000-0000-1E06-566F5D97C6A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mctf_wum6~zesk"><intent_id>687710</intent_id><project_id>759378</project_id><text_data>Scope of work: prepare surfaces, apply protective coating on tile flooring.</text_data><comment_date>2015-04-07T00:00:00</comment_date></row><row _id="row-wpd4~vcmn~z3g5" _uuid="00000000-0000-0000-6026-6B5B281D905D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wpd4~vcmn~z3g5"><intent_id>1026775</intent_id><project_id>899962</project_id><text_data>Fringe Benefits: $1.87 PTO $9.24 Health &amp; Welfare $5.55 Pension $2.00 IAP $0.08 Occup Haz $0.10 Int'l training Fund $1.15 Apprenticeship, Industry fund, LMCT _____ $19.99</text_data><comment_date>2019-12-13T00:00:00</comment_date></row><row _id="row-wzar-qczu-zii9" _uuid="00000000-0000-0000-58EE-33148FF7D785" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wzar-qczu-zii9"><intent_id>761920</intent_id><project_id>791908</project_id><text_data>302244</text_data><comment_date>2016-05-12T00:00:00</comment_date></row><row _id="row-yvx4.2v4e~8vhf" _uuid="00000000-0000-0000-E6C0-21BE562F47C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yvx4.2v4e~8vhf"><intent_id>515680</intent_id><project_id>688990</project_id><text_data>Note:  Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24CFR965:101.  Workers will be paid in accordance with Davis-Bacon wage requirments for the following crafts/trades/occupations.&amp;quot;  Trade:  Soft Floor Layer - Residential -</text_data><comment_date>2012-06-07T00:00:00</comment_date></row><row _id="row-65x6-agp9_8nuh" _uuid="00000000-0000-0000-E8F4-D86341FE0A8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-65x6-agp9_8nuh"><intent_id>977866</intent_id><project_id>881136</project_id><text_data>1. Install wood stove. 2. Mobile home. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2019-05-14T00:00:00</comment_date></row><row _id="row-yay7_6ibp_ifjt" _uuid="00000000-0000-0000-67D0-CE15D6BFBD3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yay7_6ibp_ifjt"><intent_id>1066909</intent_id><project_id>922544</project_id><text_data>Truck Driver will be driving a Ford F550 with a Trailer to deliver parts to job site</text_data><comment_date>2020-06-22T00:00:00</comment_date></row><row _id="row-x2rq.qvcr.bybk" _uuid="00000000-0000-0000-63F0-552AEACE7BC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x2rq.qvcr.bybk"><intent_id>610734</intent_id><project_id>713314</project_id><text_data>We installed bark on this project using blower trucks.</text_data><comment_date>2014-01-06T00:00:00</comment_date></row><row _id="row-hfks_hcs3.jn42" _uuid="00000000-0000-0000-63D9-4EC0E3397A70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hfks_hcs3.jn42"><intent_id>1125429</intent_id><project_id>952399</project_id><text_data>We are installing bark into landscape beds. The owner will be performing the installation, while laborers perform cleanup with a leaf blower which falls under the landscape beautification classification. The laborer will be paid the published rate for Groundskeeper under Landscape Maintenance.</text_data><comment_date>2021-02-28T00:00:00</comment_date></row><row _id="row-yike_24f6.jcxn" _uuid="00000000-0000-0000-24C4-727F9AC8E949" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yike_24f6.jcxn"><intent_id>720783</intent_id><project_id>768228</project_id><text_data>Insurance account ID is for Oregon based company, acceptable through reciprocal agreement.</text_data><comment_date>2015-09-15T00:00:00</comment_date></row><row _id="row-76gh~xdgh~r3ut" _uuid="00000000-0000-0000-CC70-55C26FF2A58C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-76gh~xdgh~r3ut"><intent_id>536551</intent_id><project_id>696672</project_id><text_data>REMOVE AND REPLACE CABINETS IN KITCHEN AND BATH, SHEET ROCK REPAIR, IN A 3 STORY APARMTMENT COMPLEX,NO GARAGE OR BASEMNET PERMANENT RESIDENCE ONLY, NO REHAB, NO TRANSITIONAL, NO COMMUNAL DINING, NO TREATMENT SERVICES, NO COUNSELING. EACH UNIT HAS OWN BATH AND KITCHEN, MANAGERS OFFICE ON SITE NO PUBLIC USE.</text_data><comment_date>2012-09-25T00:00:00</comment_date></row><row _id="row-njca.qb8c-w6vv" _uuid="00000000-0000-0000-E43E-A0A6D767538A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-njca.qb8c-w6vv"><intent_id>1184782</intent_id><project_id>979242</project_id><text_data>We will install Topsoil, plants and hydroseed</text_data><comment_date>2021-10-12T00:00:00</comment_date></row><row _id="row-fjmj_36uj.gmih" _uuid="00000000-0000-0000-49EB-E1C15F3056DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fjmj_36uj.gmih"><intent_id>492894</intent_id><project_id>679679</project_id><text_data>Units 1-20:1.  1413 BOWMONT AVE, KELSO	2.  36 ISLAND VIEW LN, CATHALMET     25709</text_data><comment_date>2011-12-09T00:00:00</comment_date></row><row _id="row-xrb7~e7ft_9kba" _uuid="00000000-0000-0000-E0F3-AF44864C5AF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xrb7~e7ft_9kba"><intent_id>690189</intent_id><project_id>758384</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2015-04-23T00:00:00</comment_date></row><row _id="row-b72a_spwe-nvxt" _uuid="00000000-0000-0000-31D7-3B77CBB304E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b72a_spwe-nvxt"><intent_id>1156081</intent_id><project_id>968494</project_id><text_data>9870118</text_data><comment_date>2021-06-28T00:00:00</comment_date></row><row _id="row-qfwa_7fz2-uqsk" _uuid="00000000-0000-0000-104E-BFE2334E1A65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qfwa_7fz2-uqsk"><intent_id>742009</intent_id><project_id>779011</project_id><text_data>1. Electrical2.apartment3.14. a. nob.noc.yesd.noe. nof.nog.noh.noi.noj.nok.no5. yes6. yes7.yes8.no</text_data><comment_date>2016-01-15T00:00:00</comment_date></row><row _id="row-hjaq-kyyz-s8fu" _uuid="00000000-0000-0000-7C79-1504B49370C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjaq-kyyz-s8fu"><intent_id>590770</intent_id><project_id>718856</project_id><text_data>This work is performed indoors</text_data><comment_date>2013-10-17T00:00:00</comment_date></row><row _id="row-2njz.ws7b-gr7q" _uuid="00000000-0000-0000-F10E-519541B16351" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2njz.ws7b-gr7q"><intent_id>917689</intent_id><project_id>855803</project_id><text_data>Add Data Network cabling to new computer lab location, trim at station outlets and head end, test and label. All inside telecommunications work.</text_data><comment_date>2018-07-12T00:00:00</comment_date></row><row _id="row-z3dk~6y23_6juz" _uuid="00000000-0000-0000-EAA2-9DC632AC7B28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3dk~6y23_6juz"><intent_id>1175962</intent_id><project_id>978473</project_id><text_data>On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes. Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.</text_data><comment_date>2021-09-13T00:00:00</comment_date></row><row _id="row-z9ja-ajh3-abws" _uuid="00000000-0000-0000-1F0F-798E7624E5D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z9ja-ajh3-abws"><intent_id>466600</intent_id><project_id>670349</project_id><text_data>Dates have been verified and are correct, thank you.</text_data><comment_date>2011-07-20T00:00:00</comment_date></row><row _id="row-bwmw~9ck4~yqcf" _uuid="00000000-0000-0000-E78E-1BED1B15B142" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bwmw~9ck4~yqcf"><intent_id>707928</intent_id><project_id>760385</project_id><text_data>Fringe Package = Ind Acct Pension ($4.00) / Pension ($5.51) / Occ Health ($0.12) / Health ($8.84) / Apprenticeship ($0.50) / Industry Fund ($0.10) / LMCT ($0.05)</text_data><comment_date>2015-07-16T00:00:00</comment_date></row><row _id="row-x685_ez2c-ef68" _uuid="00000000-0000-0000-D092-A08A2BE96A8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x685_ez2c-ef68"><intent_id>989958</intent_id><project_id>879889</project_id><text_data>Truck Driver, Other - Transport of material &amp; personnel</text_data><comment_date>2019-07-08T00:00:00</comment_date></row><row _id="row-maqj-x42e.hyh7" _uuid="00000000-0000-0000-D0B3-5259FBD18B24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-maqj-x42e.hyh7"><intent_id>570712</intent_id><project_id>711469</project_id><text_data>This is a JOC filing on an individual job order under Centennial Contractors Ent., Inc.</text_data><comment_date>2013-05-21T00:00:00</comment_date></row><row _id="row-dnrp.3ut2~np4x" _uuid="00000000-0000-0000-EF08-0282E38561FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dnrp.3ut2~np4x"><intent_id>514492</intent_id><project_id>688646</project_id><text_data>291562</text_data><comment_date>2012-05-31T00:00:00</comment_date></row><row _id="row-fk9a_dtd9~5c68" _uuid="00000000-0000-0000-2EB7-C0D8E9A473F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fk9a_dtd9~5c68"><intent_id>732550</intent_id><project_id>681988</project_id><text_data>All work is to be done onboard the ship/vessel. Contractor Registration is not necessary per L&amp;I. Fringe rate:Holiday $.69, Vacation $.35, Medical and Dental $ 5.87, Life $.15</text_data><comment_date>2015-11-20T00:00:00</comment_date></row><row _id="row-5sfe_vim7.jn4j" _uuid="00000000-0000-0000-EA6B-90F0431403DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5sfe_vim7.jn4j"><intent_id>860360</intent_id><project_id>831675</project_id><text_data>Filed by Josh Wike</text_data><comment_date>2017-09-01T00:00:00</comment_date></row><row _id="row-g9wn~vyuv.kypd" _uuid="00000000-0000-0000-7971-9545EC56844A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g9wn~vyuv.kypd"><intent_id>957126</intent_id><project_id>871710</project_id><text_data>1. Repairs to residential structures.2. Yes3. 14. A-No, B-No, C-Yes, D-No, E-No, F-No, G-No, H-No, I-No, J-No, K-No, I-No5. Yes6. Yes7. No8. No</text_data><comment_date>2019-01-25T00:00:00</comment_date></row><row _id="row-7h7u_jikw-yzjc" _uuid="00000000-0000-0000-0BD8-F61410B7DEC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7h7u_jikw-yzjc"><intent_id>667890</intent_id><project_id>749817</project_id><text_data>sr30467892</text_data><comment_date>2014-12-01T00:00:00</comment_date></row><row _id="row-szhz_bjxy_b5x4" _uuid="00000000-0000-0000-98CF-5ECDA0CC8D70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-szhz_bjxy_b5x4"><intent_id>823321</intent_id><project_id>816756</project_id><text_data>In order to consider whether the residential rate is appropriately applied according to the �residential construction� definition in WAC 296-127-010(9), the answers to each of the following questions in the notes section at the bottom of this screen are answered to the best of my ability: #1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Dormitories? (i) Counseling? (j) Is each room and/or bed in the structure rented separately? (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?1- Weatherization2- Single Family3-1-2 stories4- livinga- nob- noc- yesd- noe- nof- nog- noh- noi- noj- nok- no6- no7- no8- noRosemary Marshall517 28th Ave</text_data><comment_date>2017-03-29T00:00:00</comment_date></row><row _id="row-3ftk_n6ds~a6yp" _uuid="00000000-0000-0000-AEFC-725272D4A90E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3ftk_n6ds~a6yp"><intent_id>1199386</intent_id><project_id>991846</project_id><text_data>Scope of work; Trail resurfacing, install bark on trail surface.  Tools use; wheel barrows, scoop shovels, rakes</text_data><comment_date>2021-12-14T00:00:00</comment_date></row><row _id="row-m8yz-sp3n~2uwk" _uuid="00000000-0000-0000-9675-FC885BE0ECC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8yz-sp3n~2uwk"><intent_id>898694</intent_id><project_id>848356</project_id><text_data>Job #202129-003</text_data><comment_date>2018-04-16T00:00:00</comment_date></row><row _id="row-qity.v9f8.2ybu" _uuid="00000000-0000-0000-60C8-765EFEE78103" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qity.v9f8.2ybu"><intent_id>1051243</intent_id><project_id>915603</project_id><text_data>Landscape Construction</text_data><comment_date>2020-04-13T00:00:00</comment_date></row><row _id="row-9ht8_iimr~whh7" _uuid="00000000-0000-0000-8D07-748DDC2CC294" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9ht8_iimr~whh7"><intent_id>938151</intent_id><project_id>839969</project_id><text_data>Filed by Michelle HenslerProject is exempt from the state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2018-10-08T00:00:00</comment_date></row><row _id="row-tqnc-pi3s_im5k" _uuid="00000000-0000-0000-E819-A549B80C807E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tqnc-pi3s_im5k"><intent_id>495409</intent_id><project_id>679205</project_id><text_data>&amp;quot;Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and CFR965.101.  Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations&amp;quot;</text_data><comment_date>2012-02-06T00:00:00</comment_date></row><row _id="row-ybmw.rvd7_2hdy" _uuid="00000000-0000-0000-FDCB-F7B9229DABA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ybmw.rvd7_2hdy"><intent_id>1002444</intent_id><project_id>891352</project_id><text_data>1. Repairs to residential structures. 2. Yes 3. 1 4. A-No, B-No, C-Yes, D-No, E-No, F-No, G-No, H-No, I-No, J-No, K-No, I-No 5. Yes 6. Yes 7. No8. No</text_data><comment_date>2019-08-26T00:00:00</comment_date></row><row _id="row-rc4i.jhfj_8s3b" _uuid="00000000-0000-0000-A5AA-BC7381501872" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rc4i.jhfj_8s3b"><intent_id>494421</intent_id><project_id>679205</project_id><text_data>Project is exempt from State Prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101.  Workers will be paid in accordance with Davis-Bacon Wage Requirements for the following crafts/trades/occupations.</text_data><comment_date>2011-12-21T00:00:00</comment_date></row><row _id="row-xepk.q6ek_tpsx" _uuid="00000000-0000-0000-517C-192FF02D6C70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xepk.q6ek_tpsx"><intent_id>776419</intent_id><project_id>777297</project_id><text_data>1 - Describe the work that your firm was contracted to perform. Flooring installation#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment#3 - Including any basement or garage, how many stories or levels does the structure have? 2 Stories#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Dormitories?NO(i) Counseling?NO(j) Is each room and/or bed in the structure rented separately? YES(k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on site? YES#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2016-08-03T00:00:00</comment_date></row><row _id="row-3yjt_2d5d_prbz" _uuid="00000000-0000-0000-6768-DFA4A39D8716" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3yjt_2d5d_prbz"><intent_id>768961</intent_id><project_id>794715</project_id><text_data>Lewis 8285 Cedar Ave 98230JM is contracted for all electrical work. All residences are single family dwellings.</text_data><comment_date>2016-06-17T00:00:00</comment_date></row><row _id="row-5t5v~qg53_f8fz" _uuid="00000000-0000-0000-0DF5-64C0840ABEF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5t5v~qg53_f8fz"><intent_id>864673</intent_id><project_id>833325</project_id><text_data>Filing intent per MJW for SRO 895618</text_data><comment_date>2017-09-22T00:00:00</comment_date></row><row _id="row-gzq8.7yww~h4uh" _uuid="00000000-0000-0000-DD80-1C9D49C216C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzq8.7yww~h4uh"><intent_id>1071393</intent_id><project_id>925062</project_id><text_data>Other truck is a 4000 gallon water truck.</text_data><comment_date>2020-07-10T00:00:00</comment_date></row><row _id="row-5nmn-bzkb~wtej" _uuid="00000000-0000-0000-5951-334E97C9CB21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5nmn-bzkb~wtej"><intent_id>949202</intent_id><project_id>867996</project_id><text_data>Filed by Joyce Dalrymple</text_data><comment_date>2018-12-05T00:00:00</comment_date></row><row _id="row-r8id-nq6v.wcd5" _uuid="00000000-0000-0000-228C-180DF52B6CA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r8id-nq6v.wcd5"><intent_id>721625</intent_id><project_id>772755</project_id><text_data>Filed by Emily Ferguson.</text_data><comment_date>2015-09-18T00:00:00</comment_date></row><row _id="row-gr2a-hqcj.k7jz" _uuid="00000000-0000-0000-7F57-EE1EB3B05AE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gr2a-hqcj.k7jz"><intent_id>1007135</intent_id><project_id>893269</project_id><text_data>RECONFIGURE 2A CABLING PER APPROVED SOW</text_data><comment_date>2019-09-13T00:00:00</comment_date></row><row _id="row-q5ki.qj7g.ckk7" _uuid="00000000-0000-0000-9BCE-0EF7025391FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q5ki.qj7g.ckk7"><intent_id>951164</intent_id><project_id>864384</project_id><text_data>F821 CD-01 GAS PIPE REPLACEMENT</text_data><comment_date>2018-12-17T00:00:00</comment_date></row><row _id="row-b9bw.c67i-22t2" _uuid="00000000-0000-0000-E59F-DC4C8A928876" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9bw.c67i-22t2"><intent_id>451438</intent_id><project_id>664270</project_id><text_data>This is a maintenance contract and considered an &amp;quot;on call&amp;quot; position</text_data><comment_date>2011-04-15T00:00:00</comment_date></row><row _id="row-f6nq.7ejw-jig4" _uuid="00000000-0000-0000-1AA1-34624EF07C85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f6nq.7ejw-jig4"><intent_id>592719</intent_id><project_id>719602</project_id><text_data>There is no occupation code for Locksmith - Carpenter is used as the closest comparison.</text_data><comment_date>2013-09-10T00:00:00</comment_date></row><row _id="row-npyj~t33m.cgc3" _uuid="00000000-0000-0000-59EA-59C6EF660161" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-npyj~t33m.cgc3"><intent_id>733515</intent_id><project_id>777779</project_id><text_data>MORGAN OWENS SCHOOL, ROOM #118CRANK HANDLE REPLACEMENTS, 11-27-2015</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-zyte_rgsx.3qft" _uuid="00000000-0000-0000-746D-1359B9435B59" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zyte_rgsx.3qft"><intent_id>803641</intent_id><project_id>761232</project_id><text_data>Ok for Landscape</text_data><comment_date>2016-12-23T00:00:00</comment_date></row><row _id="row-i7pq.nweb.fqvq" _uuid="00000000-0000-0000-4981-58606D0D01EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7pq.nweb.fqvq"><intent_id>696476</intent_id><project_id>763131</project_id><text_data>RE:  SSD Seward Full Building Migration 1.	 What is the specific purpose of this awarding agency�s public works project?   Upgrade HVAC MBC�s and DPU for better efficiency. 2.	Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?  No.3.	Does this project entail the remodeling or new construction of a facility?  No.4.	If your firm is working upon a type of building system, what type of system is involved?   HVAC/refrigeration control system. 5.	What specific tasks did your employees perform?  Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process.  White off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system.  That system is used to control the system�s functions after the mechanical commissioning process is complete.  Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer.  The BAU Technician typically sits in a central control room and manipulates the system using a computer program.  The program itself informs the Technician whether various components are functioning properly as they are triggered.    If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified.  After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface.  Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.	What, if any, tools did your employees use in the performance of those tasks?  Laptop computer. 7.	If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks?  No�none. 8.	Are you going to be hiring any subcontractors for this project?  No.</text_data><comment_date>2015-05-26T00:00:00</comment_date></row><row _id="row-giz3_gqru.icig" _uuid="00000000-0000-0000-6621-2DB8FBD6DAB4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-giz3_gqru.icig"><intent_id>1368524</intent_id><project_id>1089923</project_id><text_data>9926167</text_data><comment_date>2023-10-01T00:00:00</comment_date></row><row _id="row-xnrt.m2xg_7v6f" _uuid="00000000-0000-0000-CE75-AF159F4AC74F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xnrt.m2xg_7v6f"><intent_id>991195</intent_id><project_id>886963</project_id><text_data>0</text_data><comment_date>2019-07-11T00:00:00</comment_date></row><row _id="row-k55d~ec2w~cscj" _uuid="00000000-0000-0000-507D-6BB2F6442163" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k55d~ec2w~cscj"><intent_id>796748</intent_id><project_id>796761</project_id><text_data>Order 752010</text_data><comment_date>2016-10-19T00:00:00</comment_date></row><row _id="row-49my-jrsk~guye" _uuid="00000000-0000-0000-C121-450DB61DE3D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49my-jrsk~guye"><intent_id>1191831</intent_id><project_id>987199</project_id><text_data>1.Heat Pump Installation	2.SFD 3.One 4.a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No l)No 5.Yes 6.Yes 7.No 8.No</text_data><comment_date>2021-11-08T00:00:00</comment_date></row><row _id="row-4ehy.bj9h_653s" _uuid="00000000-0000-0000-09A9-3333CCEB5ED6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ehy.bj9h_653s"><intent_id>656481</intent_id><project_id>719338</project_id><text_data>Form filed by: Vladimir Lats</text_data><comment_date>2014-09-24T00:00:00</comment_date></row><row _id="row-8z43.b2gc~436u" _uuid="00000000-0000-0000-1919-334BE7B8D0E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8z43.b2gc~436u"><intent_id>1181725</intent_id><project_id>911212</project_id><text_data>Federal project using  Clallam County 43.11</text_data><comment_date>2021-09-29T00:00:00</comment_date></row><row _id="row-7xy4_79tp_pg4n" _uuid="00000000-0000-0000-5158-6E8BEDC5C7DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7xy4_79tp_pg4n"><intent_id>787011</intent_id><project_id>800741</project_id><text_data>PROJECT REQUIRES ENGINEERED WOOD FIBER MATERIAL TO BE INSTALLED.  WE SUB CONTRACTED AN INSTALLER TO BLOW IN THE MATERIAL.</text_data><comment_date>2016-09-02T00:00:00</comment_date></row><row _id="row-p29c-hvvm_mj5i" _uuid="00000000-0000-0000-8387-1681018AE5DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p29c-hvvm_mj5i"><intent_id>1104206</intent_id><project_id>937728</project_id><text_data>Our customer hired us to supply deliver and install bark and/or mulch to a depth of 2 to 4 inches. The laborers assist the truck driver by dragging hoses to the designated installation area and using backpack blowers to guide material into place and for clean up of material overspray.</text_data><comment_date>2020-11-18T00:00:00</comment_date></row><row _id="row-zcba~uhde-v682" _uuid="00000000-0000-0000-7295-F092DDC7D59A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zcba~uhde-v682"><intent_id>982425</intent_id><project_id>883141</project_id><text_data>19-10-129THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.</text_data><comment_date>2019-06-05T00:00:00</comment_date></row><row _id="row-6yxa_rw42~mgdg" _uuid="00000000-0000-0000-8974-CE05D3820848" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6yxa_rw42~mgdg"><intent_id>893569</intent_id><project_id>845031</project_id><text_data>The owner is performing all the work.</text_data><comment_date>2018-03-19T00:00:00</comment_date></row><row _id="row-xtcv_asua~h6kt" _uuid="00000000-0000-0000-2678-0015A42F21D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xtcv_asua~h6kt"><intent_id>732378</intent_id><project_id>777199</project_id><text_data>Other Trucks - Lowboy for Mobilization.</text_data><comment_date>2015-11-19T00:00:00</comment_date></row><row _id="row-sgyb~krhu.ttcx" _uuid="00000000-0000-0000-CBDE-F3E0DD96E5AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sgyb~krhu.ttcx"><intent_id>694639</intent_id><project_id>762304</project_id><text_data>Provide and install category 5e plenum 4 pair cables to serve telephone and workstations inside building</text_data><comment_date>2015-05-15T00:00:00</comment_date></row><row _id="row-p4k5.9niu-48xh" _uuid="00000000-0000-0000-1C29-B8C1A37E393D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4k5.9niu-48xh"><intent_id>1137219</intent_id><project_id>958925</project_id><text_data>General Laborers will do general cleanup, material handling and carpenter tending.</text_data><comment_date>2021-04-20T00:00:00</comment_date></row><row _id="row-mr69~nu3m_u3qp" _uuid="00000000-0000-0000-500D-8BA6B1A8E68C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mr69~nu3m_u3qp"><intent_id>1131503</intent_id><project_id>952883</project_id><text_data>Single Family Home#1 - Describe the work that your firm was contracted to perform INSULATION#2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominiumNO, or other residential structure? NO#3 - Including any basement or garage, how many stories or levels does the structure have? ONE#4 - What is the building used for? --Answer 'yes' or 'no' to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO G) Is each room and/or bed in the structure rented separately? NO (k) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager's office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2021-03-25T00:00:00</comment_date></row><row _id="row-fspi-gq9g_e8a3" _uuid="00000000-0000-0000-1B84-AB961314BB56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fspi-gq9g_e8a3"><intent_id>1110175</intent_id><project_id>943721</project_id><text_data>replaced a  Suburban 12V 40 M BTU LP heater  company vehicles used</text_data><comment_date>2020-12-29T00:00:00</comment_date></row><row _id="row-87yz-ydq3~2z3k" _uuid="00000000-0000-0000-B1C4-20BB492CC102" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87yz-ydq3~2z3k"><intent_id>798490</intent_id><project_id>792807</project_id><text_data>Hydroseed using a 500 gallon hydro seeder. Spraying mulch, fertilizer, and seed according to specifications.</text_data><comment_date>2016-10-27T00:00:00</comment_date></row><row _id="row-eut4_gk9k~eemx" _uuid="00000000-0000-0000-4D35-FF9810B941FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eut4_gk9k~eemx"><intent_id>474254</intent_id><project_id>668588</project_id><text_data>A general laborer does manual/hand labor such as shoveling asphalt to fill in low areas or removing it from high spots.  They hand-finish the edges of the road and the joints in the asphalt mat.  They perform hand clean up.  They will be using shovels, brooms and lutes and will be using their personal vehicles to get them to the project.  They will not be operating any equipment.Fringe breakdown:Laborers: H&amp;W:  $5.00, Pension:  $3.60, Training:  $0.45, WALECET:  $0.07 = $9.12Operators:  H&amp;S:  $7.55, Pension:  $6.90, Training:  $0.70 = $15.15Truck Drivers:  H&amp;W:  $7.55, Pension:  $1.00 = $ 8.55</text_data><comment_date>2011-08-24T00:00:00</comment_date></row><row _id="row-4ggj-ux87.iyqz" _uuid="00000000-0000-0000-5642-CAC03E7624BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ggj-ux87.iyqz"><intent_id>1254110</intent_id><project_id>1024529</project_id><text_data>INV # 88982612 SR # 52584532</text_data><comment_date>2022-08-01T00:00:00</comment_date></row><row _id="row-ufgr~95qg-tc9f" _uuid="00000000-0000-0000-C72E-63167B9F10DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ufgr~95qg-tc9f"><intent_id>1129505</intent_id><project_id>954684</project_id><text_data>We have no employees at this branch that are classified as mechanics. All employees are either apprentice or Journeyman electricians.</text_data><comment_date>2021-03-26T00:00:00</comment_date></row><row _id="row-abwv_66ef~uxwk" _uuid="00000000-0000-0000-2C18-2B11A34509AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-abwv_66ef~uxwk"><intent_id>1144575</intent_id><project_id>936723</project_id><text_data>Oldcastle infrastructure believes that the work and hours described in this intent to pay prevailing wage and/or affidavit of wages paid is not subject to payment of prevailing wage.  Oldcastle precast's filing of an intent to pay prevailing wage and/or affidavit of wages paid may not be construed in any manner whatsoever as an acknowledgement or agreement that the work and hours described therein are subject to payment of prevailing wage.</text_data><comment_date>2021-05-13T00:00:00</comment_date></row><row _id="row-y5gs.crug-x4p2" _uuid="00000000-0000-0000-FFF8-46AE2180D260" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5gs.crug-x4p2"><intent_id>816501</intent_id><project_id>798378</project_id><text_data>Filed by James J. Sarich</text_data><comment_date>2017-02-17T00:00:00</comment_date></row><row _id="row-3c9k-62fy~ptyh" _uuid="00000000-0000-0000-1E89-0A719E2C30B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3c9k-62fy~ptyh"><intent_id>1137302</intent_id><project_id>958975</project_id><text_data>Remove dirt and grass using a tractor with fraze mower attachment.  Haul off with a mini dump truck that can hold only up to 3 yards.</text_data><comment_date>2021-04-20T00:00:00</comment_date></row><row _id="row-fe7f~974w~tt3j" _uuid="00000000-0000-0000-B7D4-123F8E69AABD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fe7f~974w~tt3j"><intent_id>1519364</intent_id><project_id>1128265</project_id><text_data>relocating low voltage cabling to accommodate install of the new HVAC equipment</text_data><comment_date>2025-03-19T00:00:00</comment_date></row><row _id="row-35wx_w8nc-2riq" _uuid="00000000-0000-0000-F184-41A6DDE5D439" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-35wx_w8nc-2riq"><intent_id>876843</intent_id><project_id>837971</project_id><text_data>Chainman - State Rate $57.17 (Wage $46.01 Fringe $11.16)Construction Site Surveyor - State Rate $58.69 (Wage $42.88 Fringe $15.81)</text_data><comment_date>2017-11-29T00:00:00</comment_date></row><row _id="row-pzuf_6tct_bu7q" _uuid="00000000-0000-0000-CC41-D5DDBC8C8B5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pzuf_6tct_bu7q"><intent_id>521396</intent_id><project_id>688012</project_id><text_data>Idaho Workers Comp</text_data><comment_date>2012-07-10T00:00:00</comment_date></row><row _id="row-3j5u.5skg.kv2v" _uuid="00000000-0000-0000-56E4-2C342D8ED6BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3j5u.5skg.kv2v"><intent_id>1008267</intent_id><project_id>890268</project_id><text_data>Plant installation</text_data><comment_date>2019-09-18T00:00:00</comment_date></row><row _id="row-4jnr~srzf_jyda" _uuid="00000000-0000-0000-BCBC-418110DCBFD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4jnr~srzf_jyda"><intent_id>959765</intent_id><project_id>872966</project_id><text_data>Roof and gutter cleaning and pressure washing</text_data><comment_date>2019-02-11T00:00:00</comment_date></row><row _id="row-yj2x.kyas.p2qi" _uuid="00000000-0000-0000-06D5-F0B4454D68B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yj2x.kyas.p2qi"><intent_id>617659</intent_id><project_id>729761</project_id><text_data>This contract is for Irrigation Maintenance at multiple sites for Sound Transit for a 3 year period. This project to consist of monitoring and maintaining irrigation systems and doing repair work as needed on various sites in the counties of King, Pierce, and Snohomish. Equipment to be used includes shovels, brooms, blowers (for clean up purposes), compressors for winterization, and various hand tools to complete the irrigation maintenance and repairs needed for these Sound Transit sites.This service is on a set schedule monthly from May 1 through October 1, with irrigation startups beginning around March 15, set on a daily basis and winterization beginning around October 15, set on a daily basis until all sites are complete.</text_data><comment_date>2014-02-25T00:00:00</comment_date></row><row _id="row-bnmu_5wes~if5f" _uuid="00000000-0000-0000-2FF5-B782BB2F1114" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bnmu_5wes~if5f"><intent_id>722603</intent_id><project_id>773181</project_id><text_data>the contract is currently pending until receipt of this intent then they are to finish the process and provide us a contract.  We are ready to start work as soon as the contract is received and the intent has been approved.</text_data><comment_date>2015-09-24T00:00:00</comment_date></row><row _id="row-hjmu-taah_4vbh" _uuid="00000000-0000-0000-4046-DF86A634F0A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjmu-taah_4vbh"><intent_id>790861</intent_id><project_id>745083</project_id><text_data>Health &amp; Welfare: $8.25Pension: $9.65Training: $0.70</text_data><comment_date>2016-09-21T00:00:00</comment_date></row><row _id="row-xxdd-7yhs~nwkd" _uuid="00000000-0000-0000-0F5A-BAA6E435AA9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xxdd-7yhs~nwkd"><intent_id>940079</intent_id><project_id>851126</project_id><text_data>Filed by Jeffrey Scott</text_data><comment_date>2018-10-16T00:00:00</comment_date></row><row _id="row-82ey~75hd-9kne" _uuid="00000000-0000-0000-1676-4CF6998B114E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-82ey~75hd-9kne"><intent_id>825452</intent_id><project_id>804784</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR &amp; WATER TRUCK</text_data><comment_date>2017-04-10T00:00:00</comment_date></row><row _id="row-yv9w-rf9w~fgci" _uuid="00000000-0000-0000-4CA8-A7F374226A55" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yv9w-rf9w~fgci"><intent_id>1051292</intent_id><project_id>915633</project_id><text_data>B. Equipment Sales Company part of project:Lay out for demo and excavation, Install lift components, pour back concrete slab, program and test lift.Work completed by Millright: layout, installation of lift components, concrete finishing, programming and testing lift. Tools and equipment used: Assorted power and hand tools, forklift</text_data><comment_date>2020-05-27T00:00:00</comment_date></row><row _id="row-rr5y_jk3i-ur74" _uuid="00000000-0000-0000-F1AA-7E50F6750D32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rr5y_jk3i-ur74"><intent_id>903225</intent_id><project_id>850353</project_id><text_data>Filed by Jerry Van Guilder</text_data><comment_date>2018-05-08T00:00:00</comment_date></row><row _id="row-bsqj-cnt6_jqei" _uuid="00000000-0000-0000-F318-13D5916E6620" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bsqj-cnt6_jqei"><intent_id>823699</intent_id><project_id>816198</project_id><text_data>We are the subcontractor on this project. Our work on this project is to do the final seeding on the disturbed areas. We will be using a hydroseeder.</text_data><comment_date>2017-03-30T00:00:00</comment_date></row><row _id="row-unqp.wtw2-ds7s" _uuid="00000000-0000-0000-0AE5-C5912E35DED1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-unqp.wtw2-ds7s"><intent_id>932892</intent_id><project_id>861450</project_id><text_data>SANDY LEVERICH - RESIDENTIAL BATH EXHAUST FAN WITH AIR CYCLER SWITCH1194 US HWY 12 #15 MONTESANO WA   98563JOB #1876527  CLIENT #1872</text_data><comment_date>2018-09-14T00:00:00</comment_date></row><row _id="row-wtjj~pt6y_wd23" _uuid="00000000-0000-0000-E08B-D2D21BB7A1D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wtjj~pt6y_wd23"><intent_id>588664</intent_id><project_id>718126</project_id><text_data>PC-6</text_data><comment_date>2013-08-20T00:00:00</comment_date></row><row _id="row-ff6d~6w5p~ikgk" _uuid="00000000-0000-0000-57B4-11881949943E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ff6d~6w5p~ikgk"><intent_id>449935</intent_id><project_id>663688</project_id><text_data>Industrial Insurance Account Id: 434,980-01</text_data><comment_date>2011-04-13T00:00:00</comment_date></row><row _id="row-z3um.pa2s~wefh" _uuid="00000000-0000-0000-9289-18BF28C2E4DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3um.pa2s~wefh"><intent_id>1091563</intent_id><project_id>934238</project_id><text_data>Called city onsight while jetting customers line found roots in the community tie in got approval for jetting there line used root rat nozzle jetted approximately 150feet was informed this is approximately 120 feet long was able to camera inspect to 117 feet jetted 99 percent of roots out of line. There was about 4 good root balls in this line threatening to back up in the future</text_data><comment_date>2020-09-28T00:00:00</comment_date></row><row _id="row-9nyw~desr_2yie" _uuid="00000000-0000-0000-BB6A-ED38E659D3FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9nyw~desr_2yie"><intent_id>1140225</intent_id><project_id>943165</project_id><text_data>OTHER TRUCK: IS TO HAUL CONCRETE HIGHWAY BARRIER</text_data><comment_date>2021-04-28T00:00:00</comment_date></row><row _id="row-eiyn-fh9m-b76k" _uuid="00000000-0000-0000-6757-D27D5D688CE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eiyn-fh9m-b76k"><intent_id>716624</intent_id><project_id>770752</project_id><text_data>73120 0066</text_data><comment_date>2015-08-25T00:00:00</comment_date></row><row _id="row-gkqr_dx5a~nrxj" _uuid="00000000-0000-0000-6093-423D380EE2E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gkqr_dx5a~nrxj"><intent_id>1142396</intent_id><project_id>961127</project_id><text_data>Landscape maintenance - mow, blower, weed, mulch and prunning using hand tools</text_data><comment_date>2021-05-06T00:00:00</comment_date></row><row _id="row-pae8~uk4u-ss6g" _uuid="00000000-0000-0000-68DF-A3EA6CA253BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pae8~uk4u-ss6g"><intent_id>1000642</intent_id><project_id>875822</project_id><text_data>117685-001</text_data><comment_date>2019-08-19T00:00:00</comment_date></row><row _id="row-4sqm-8272_wfnr" _uuid="00000000-0000-0000-7DCA-6EEF8E8B91E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4sqm-8272_wfnr"><intent_id>659679</intent_id><project_id>736993</project_id><text_data>NOTE: Our employees are Oregon residents and are covered by SAIF Corporation for workers compensation, Policy No. 791901 AR.</text_data><comment_date>2014-10-10T00:00:00</comment_date></row><row _id="row-8efa~rryy.hv3z" _uuid="00000000-0000-0000-CA96-0CBC17354636" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8efa~rryy.hv3z"><intent_id>1099789</intent_id><project_id>938154</project_id><text_data>47768140 /  87041591 +  47768026 /  87041734 +  47768100 /  87073171 +  47768120 /  87048724 +  47768042 /  87048682 +  47768068 /  87041577 +  47768036 /  87041637</text_data><comment_date>2020-10-29T00:00:00</comment_date></row><row _id="row-u4s2-xjz9.c8j4" _uuid="00000000-0000-0000-B8C9-7E1E52F48C6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u4s2-xjz9.c8j4"><intent_id>1091049</intent_id><project_id>887302</project_id><comment_date>2020-10-07T00:00:00</comment_date></row><row _id="row-djz3.p8j3~zfdy" _uuid="00000000-0000-0000-40C8-FA7FF46FE245" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-djz3.p8j3~zfdy"><intent_id>491591</intent_id><project_id>676581</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Beacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2011-12-01T00:00:00</comment_date></row><row _id="row-vy4i_nd9x~uint" _uuid="00000000-0000-0000-2343-18D8904621E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vy4i_nd9x~uint"><intent_id>827904</intent_id><project_id>801469</project_id><text_data>The solar modules are not attached to the roof, they are attached to the racking with clamps.</text_data><comment_date>2017-04-26T00:00:00</comment_date></row><row _id="row-ztzr~jnx7.b9cj" _uuid="00000000-0000-0000-9C94-0CB1A3AE6861" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ztzr~jnx7.b9cj"><intent_id>498022</intent_id><project_id>681816</project_id><text_data>604 S. Cedar, Pasco69302 2nd Ave, Plymouth</text_data><comment_date>2012-01-25T00:00:00</comment_date></row><row _id="row-pknm_vpjq~ys8a" _uuid="00000000-0000-0000-A8AA-CEA951A0B2D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pknm_vpjq~ys8a"><intent_id>549318</intent_id><project_id>701852</project_id><text_data>Landscape Construction Landscaping or planting Laborers will not spread straw.  The Straw spreaders will be tracked as gerneral laborers.</text_data><comment_date>2013-01-04T00:00:00</comment_date></row><row _id="row-2fd3-p6ts.b6at" _uuid="00000000-0000-0000-BFC9-1D61918B5BD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2fd3-p6ts.b6at"><intent_id>915992</intent_id><project_id>853617</project_id><text_data>Hired to install floors.</text_data><comment_date>2018-07-05T00:00:00</comment_date></row><row _id="row-2p8n-wjvn~yj2x" _uuid="00000000-0000-0000-701E-3C644A2EEB26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2p8n-wjvn~yj2x"><intent_id>807297</intent_id><project_id>809416</project_id><text_data>Job #109987-001</text_data><comment_date>2016-12-15T00:00:00</comment_date></row><row _id="row-mzn7.pfd8-t5h7" _uuid="00000000-0000-0000-EEA2-F62707DEB0EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mzn7.pfd8-t5h7"><intent_id>809146</intent_id><project_id>810289</project_id><text_data>Basic landscape maintenance of ROW, mowing, trimming of grass, shrubs,ground covers includes bed care raking, weeding and mulching. Equipment will be commercial quality landscaper hand tools, power blowers, mowers and trimmers</text_data><comment_date>2016-12-29T00:00:00</comment_date></row><row _id="row-ycgw.5h99.4bq6" _uuid="00000000-0000-0000-280E-5C1FF3DD791D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ycgw.5h99.4bq6"><intent_id>760555</intent_id><project_id>791312</project_id><text_data>--ON 04/15/2016 :--PROVIDE AND INSTALL SINGLE CAMERA WITH WIRELESS LAN AND POE SWITCH.</text_data><comment_date>2016-05-06T00:00:00</comment_date></row><row _id="row-g8a6.tdea_txrm" _uuid="00000000-0000-0000-35DD-116AC9D42582" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g8a6.tdea_txrm"><intent_id>472577</intent_id><project_id>672452</project_id><text_data>If we do use the &amp;quot;Other&amp;quot; 2 Ton &amp;quot;landscape truck&amp;quot; it will be used to haul garbage to the dump.</text_data><comment_date>2011-09-06T00:00:00</comment_date></row><row _id="row-3uwd.xaim~dfdh" _uuid="00000000-0000-0000-2C7D-A76A916D231D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3uwd.xaim~dfdh"><intent_id>566710</intent_id><project_id>709796</project_id><text_data>Filed By Tom Morrissey</text_data><comment_date>2013-04-26T00:00:00</comment_date></row><row _id="row-5gu2-jt4t.2iy3" _uuid="00000000-0000-0000-E82C-D6C283F6CEDC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5gu2-jt4t.2iy3"><intent_id>471338</intent_id><project_id>603473</project_id><text_data>This is for SW Recycling/Transfer station, South District Court, Sheriff's South Precinct</text_data><comment_date>2011-08-10T00:00:00</comment_date></row><row _id="row-4ny2~vmdg.r82x" _uuid="00000000-0000-0000-E2F2-887387A5D046" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ny2~vmdg.r82x"><intent_id>960713</intent_id><project_id>873453</project_id><text_data>Elect tech(06)Telephone and data cabling inside building</text_data><comment_date>2019-02-18T00:00:00</comment_date></row><row _id="row-7m94_azms.jtpx" _uuid="00000000-0000-0000-3AA5-1D18B1F6DEA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7m94_azms.jtpx"><intent_id>624208</intent_id><project_id>732725</project_id><text_data>Three different residential sites and one community building.  Residential units ADA work, single family duplex, no basement, no garage, single story, permanent single family occupancy. a. no b. no c. yes d. no e. no f. no g. no h. no I. no j. no k. no 5. yes 6 yes 7. no 8. no</text_data><comment_date>2014-04-10T00:00:00</comment_date></row><row _id="row-526e_3jk5_3mn3" _uuid="00000000-0000-0000-07C1-CD4E0B1AE2D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-526e_3jk5_3mn3"><intent_id>1153269</intent_id><project_id>944166</project_id><text_data>Federal and Sate wages highest of the two.</text_data><comment_date>2021-06-17T00:00:00</comment_date></row><row _id="row-wsd8_yh6n_c8sr" _uuid="00000000-0000-0000-8DAD-0024CF8DCA99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wsd8_yh6n_c8sr"><intent_id>1196767</intent_id><project_id>990088</project_id><text_data>Truck less than 16,000 GVW to haul materials and debris</text_data><comment_date>2022-01-07T00:00:00</comment_date></row><row _id="row-qrxa.tpj7~eg3f" _uuid="00000000-0000-0000-FD9B-06482E1CCC45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qrxa.tpj7~eg3f"><intent_id>1186894</intent_id><project_id>984418</project_id><text_data>Angel Spell notified job was completed on 10/19/2021. An invoice was sent to her.</text_data><comment_date>2021-10-20T00:00:00</comment_date></row><row _id="row-2m5q~ve2u_umms" _uuid="00000000-0000-0000-F81A-DE83F1D7CB3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2m5q~ve2u_umms"><intent_id>1196097</intent_id><project_id>984116</project_id><comment_date>2021-11-30T00:00:00</comment_date></row><row _id="row-zxaq.v58b.frib" _uuid="00000000-0000-0000-CA24-F326B5B131FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxaq.v58b.frib"><intent_id>1056244</intent_id><project_id>918116</project_id><text_data>Fringe - $2.00 Hol/Vac; $3.54 Med/Dent; $.225 Accd/life/std/ltd</text_data><comment_date>2020-05-06T00:00:00</comment_date></row><row _id="row-krhz~d2e7_9xk3" _uuid="00000000-0000-0000-0418-C7F67AFCD892" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-krhz~d2e7_9xk3"><intent_id>1102955</intent_id><project_id>939747</project_id><text_data>minor wood structure repair - saw, hammer, nails</text_data><comment_date>2020-12-17T00:00:00</comment_date></row><row _id="row-iyhb-6c4i~asdq" _uuid="00000000-0000-0000-4315-396C4387BBFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iyhb-6c4i~asdq"><intent_id>1178237</intent_id><project_id>968437</project_id><text_data>Union 302:Health and Security: $8.97 Pension: $13.65 Apprenticeship Training/Retraining: $0.70National Training: $0.05 Total Fringe Benefit: $23.37Union 242:Pension: $5.04Health and Security: $7.20Training: $0.95LECET: $0.14Total Fringe Benefit: $13.33</text_data><comment_date>2021-09-16T00:00:00</comment_date></row><row _id="row-v23v.y22r~kjmf" _uuid="00000000-0000-0000-440A-55DC771E63AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v23v.y22r~kjmf"><intent_id>1177726</intent_id><project_id>970217</project_id><text_data>The millwrights will be responsible for installation of Paint Booths and Paint Kitchen which includes, but is not limited to, installation of the Pre-Manufactured Booth Enclosures, Pre-Manufactured Paint Kitchen, Air Make-Up Unit, Fans and Misc Equipment per Manufacturers Layout, Prints and Buyout Manufacturer Instructions. Equipment used includes Scissor Lifts and Fork Trucks. Hand and Power Tools are used for assembly.</text_data><comment_date>2021-09-23T00:00:00</comment_date></row><row _id="row-72fe.gapp-r7k2" _uuid="00000000-0000-0000-6FE5-C807F1A14979" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-72fe.gapp-r7k2"><intent_id>1030884</intent_id><project_id>900048</project_id><text_data>192655- Per WAC 296-127-01378 Telecommunications Technicians will be repairing backbone cabling for telephones and computers.  Cables will run indoors.  Terminate, test and label.</text_data><comment_date>2020-01-09T00:00:00</comment_date></row><row _id="row-v8q8~c245_afpv" _uuid="00000000-0000-0000-7D6C-3497BB2FE8C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8q8~c245_afpv"><intent_id>617289</intent_id><project_id>729587</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors.</text_data><comment_date>2014-02-21T00:00:00</comment_date></row><row _id="row-4nt2-9x86.dtxs" _uuid="00000000-0000-0000-C953-C4A2C12AD1F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4nt2-9x86.dtxs"><intent_id>530220</intent_id><project_id>694437</project_id><text_data>Locate and remove UST'S at 1741 Jefferson Ave., Tacoma and system demo at UW Tacoma CampusGeneral Laborers to remove debris using brooms, shovels and/or small hand toolsExcavator to dig debris and load onto truckDump Truck &amp; Trailer to haul equipment and debris</text_data><comment_date>2012-08-23T00:00:00</comment_date></row><row _id="row-v8iw.y324~9wwr" _uuid="00000000-0000-0000-EBCD-BE018286FB53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v8iw.y324~9wwr"><intent_id>1107447</intent_id><project_id>942185</project_id><text_data>Service truck used to get to work site and carry any possible needed hand tools or parts</text_data><comment_date>2020-12-04T00:00:00</comment_date></row><row _id="row-db6s-9xav_q4er" _uuid="00000000-0000-0000-66BF-FF9803D37E99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-db6s-9xav_q4er"><intent_id>576320</intent_id><project_id>713232</project_id><text_data>Scope of work includes planting, hydroseeding, sod installation, repair and new irrigation, including seeding, fine grade topsoil and install steel tree rings.</text_data><comment_date>2013-06-19T00:00:00</comment_date></row><row _id="row-2m6t.p7ew_k7pj" _uuid="00000000-0000-0000-F2D8-164BA3379932" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2m6t.p7ew_k7pj"><intent_id>1005925</intent_id><project_id>892747</project_id><text_data>WO # 9538954</text_data><comment_date>2019-09-10T00:00:00</comment_date></row><row _id="row-4u5a.9keb_h9ir" _uuid="00000000-0000-0000-1B58-67BE6C9043A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4u5a.9keb_h9ir"><intent_id>1203612</intent_id><project_id>994536</project_id><text_data>PROVIDE AND INSTALL 12 SM FIBER OPTIC CABLE FROM NEW COK FIRE STATION TO NEW SIGNAL CABINET OUTSIDE FIRE STATION 24</text_data><comment_date>2022-01-10T00:00:00</comment_date></row><row _id="row-4pzk~gje6.ekrc" _uuid="00000000-0000-0000-0B65-F7217C9157A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4pzk~gje6.ekrc"><intent_id>503959</intent_id><project_id>684245</project_id><text_data>Job # C11091</text_data><comment_date>2012-03-15T00:00:00</comment_date></row><row _id="row-mcgd-uihm-yb89" _uuid="00000000-0000-0000-A15E-2D53C8A37710" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mcgd-uihm-yb89"><intent_id>1198837</intent_id><project_id>991477</project_id><text_data>Job #39948-1</text_data><comment_date>2021-12-13T00:00:00</comment_date></row><row _id="row-45wm-sc79~mk5y" _uuid="00000000-0000-0000-BB3C-8C158A47EAE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-45wm-sc79~mk5y"><intent_id>648297</intent_id><project_id>674285</project_id><text_data>Only doing pumping, please reference RCW 18.27/WAC296-200A-016 (9) Concrete Specialty. If you have any other questions, call Bruce Springer at 1-360-902-6847.</text_data><comment_date>2014-08-15T00:00:00</comment_date></row><row _id="row-zqxf_4y52_7icg" _uuid="00000000-0000-0000-647E-8B949872C1C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zqxf_4y52_7icg"><intent_id>848942</intent_id><project_id>775628</project_id><text_data>**We do not have an industrial insurance account in Washington since we are there on a temporary basis. We have Oregon Workers Comp insurance (Saif Policy#439059) and stop gap liability.</text_data><comment_date>2017-07-20T00:00:00</comment_date></row><row _id="row-mutn~7yhy.2mi3" _uuid="00000000-0000-0000-AC5D-61B966D039C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mutn~7yhy.2mi3"><intent_id>749901</intent_id><project_id>786588</project_id><text_data>1)HVAC Service, 2) Single Family Residence, 3) One level , 4) A)NO, B)NO, C)YES, D)NO, E)NO, F)NO, G)NO, H)NO, I)NO, J)NO, 5) one kitchen in residence, 6) one bathroom in home,  7) No, 8) No</text_data><comment_date>2016-03-04T00:00:00</comment_date></row><row _id="row-rmnq_vmnh_p94k" _uuid="00000000-0000-0000-0AEF-129C4B608BC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rmnq_vmnh_p94k"><intent_id>835732</intent_id><project_id>822033</project_id><text_data>Other trucks are low boys for hauling equipment</text_data><comment_date>2017-05-23T00:00:00</comment_date></row><row _id="row-fqr8~5fwt-3ye6" _uuid="00000000-0000-0000-5E69-6BB93DAAC8A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fqr8~5fwt-3ye6"><intent_id>621561</intent_id><project_id>716376</project_id><text_data>We are providing and installing telephone/data cabling to the low voltage system. Work is all performed indoors throughout the two story apartment buildings.</text_data><comment_date>2014-03-26T00:00:00</comment_date></row><row _id="row-a7a2.4mgd~fgpt" _uuid="00000000-0000-0000-B14F-777C0426681C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a7a2.4mgd~fgpt"><intent_id>1193643</intent_id><project_id>984339</project_id><comment_date>2021-11-16T00:00:00</comment_date></row><row _id="row-4zgs.by47_yqyt" _uuid="00000000-0000-0000-9AC6-987780009855" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4zgs.by47_yqyt"><intent_id>1207208</intent_id><project_id>996943</project_id><text_data>LONG 5050.210631</text_data><comment_date>2022-01-26T00:00:00</comment_date></row><row _id="row-ffe4-aytg_qcna" _uuid="00000000-0000-0000-C82A-66CCF9BA432F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ffe4-aytg_qcna"><intent_id>763861</intent_id><project_id>774368</project_id><text_data>Jonathan,Here is explanation of the work being performed.A) The Rafn Company is doing remodel work to existing buildings at the site. Rafn is residing buildings, replacing widows and painting the exterior of buildings. They are performing this work by the use of scaffolding.B) Cerna Landscape will be removing existing plants so that scaffolding can be erected so Rafn can perform  their work.  Cerna Landscape will remove plants using shovels, picks, racks ,      and wheelbarrows.  There is NO irrigation system or French drain work occurring, and no topsoil or mulch being installed.</text_data><comment_date>2016-05-25T00:00:00</comment_date></row><row _id="row-5qeg.dmds-t649" _uuid="00000000-0000-0000-5E54-E0D05F368630" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5qeg.dmds-t649"><intent_id>1034348</intent_id><project_id>887194</project_id><text_data>Project #93355</text_data><comment_date>2020-01-28T00:00:00</comment_date></row><row _id="row-zvs3_fhsv.97qq" _uuid="00000000-0000-0000-DDF9-CB6323DEFA32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zvs3_fhsv.97qq"><intent_id>1102775</intent_id><project_id>934115</project_id><text_data>Work performed by the Telecommunication Technicians is installing Category 6A cabling for voice and data indoors. POWERCOM JOB#451448</text_data><comment_date>2020-11-11T00:00:00</comment_date></row><row _id="row-9p2e_yki8_rie5" _uuid="00000000-0000-0000-971E-5F3161DF0656" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9p2e_yki8_rie5"><intent_id>1016697</intent_id><project_id>892711</project_id><text_data>This is a replacement Intent - original Intent was filed under the wrong Hiring Contractor's Intent #</text_data><comment_date>2019-10-21T00:00:00</comment_date></row><row _id="row-myaw~4ynf_i8cj" _uuid="00000000-0000-0000-D433-ED17DEDD1607" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-myaw~4ynf_i8cj"><intent_id>512638</intent_id><project_id>687924</project_id><text_data>Industrial Insurance/workers comp account number......867,364-00</text_data><comment_date>2012-05-21T00:00:00</comment_date></row><row _id="row-7ri7_3di7-jviy" _uuid="00000000-0000-0000-CC6F-DD8291F948AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7ri7_3di7-jviy"><intent_id>874094</intent_id><project_id>837155</project_id><text_data>Roxhill is a multi-family complex, each unit has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The complex is no more than four stories in height and does not have a business nor is it open to the public. The crew will be installing new ductless heat pumps. This job meets the residential job requirements.</text_data><comment_date>2017-11-09T00:00:00</comment_date></row><row _id="row-b97g~p6ez~fc83" _uuid="00000000-0000-0000-8FB7-4FFF25C02428" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b97g~p6ez~fc83"><intent_id>896710</intent_id><project_id>837236</project_id><text_data>HYDROSEEDING SERVICES ONLY</text_data><comment_date>2018-04-04T00:00:00</comment_date></row><row _id="row-5ptf~jh8n-y5ya" _uuid="00000000-0000-0000-60C6-B69510F27501" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ptf~jh8n-y5ya"><intent_id>810537</intent_id><project_id>810931</project_id><text_data>Tom Gibleyou the owner and President of the company will be the one performing the work associated with this project.</text_data><comment_date>2017-01-10T00:00:00</comment_date></row><row _id="row-6mrs~iq63-aerj" _uuid="00000000-0000-0000-1E82-52EE19F8F7C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6mrs~iq63-aerj"><intent_id>1015022</intent_id><project_id>896052</project_id><text_data>Owner operater General Labor for 4 hours and Truck Drive for 1.5 hours</text_data><comment_date>2019-10-13T00:00:00</comment_date></row><row _id="row-833q_ahdn_ttdy" _uuid="00000000-0000-0000-272A-04D1A14EE966" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-833q_ahdn_ttdy"><intent_id>629272</intent_id><project_id>731091</project_id><text_data>Scope of work is limited to Mob, Type B topsoil &amp;lt;2&amp;quot; deep, seeding, and sodding</text_data><comment_date>2014-05-12T00:00:00</comment_date></row><row _id="row-rjwb_drim.665d" _uuid="00000000-0000-0000-3071-894880CCC1ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rjwb_drim.665d"><intent_id>547602</intent_id><project_id>701069</project_id><text_data>One employee will be needed for this project, This work consist of landscape improvements(Clearing, grubbing,  and desposal of existing vegetation,fine grading,installation of compost, topsoil, plant material, mulch, and landscape boulders.) to aprox, 520 sq ft of area, construction and installation of sign supports, concrete block landscape curb, removal of a small area of asphalt to enlarge landscape area,and  reinstall small section of concrete curb.Most of this work it will be perform by me the owner of the company and  I will be using a small excavator and I will be the operator of any equipment needed, I will have one labor to help with the work, I estimate the work to last from 2-3 weeks.</text_data><comment_date>2012-12-07T00:00:00</comment_date></row><row _id="row-98mz~4u82~4c4p" _uuid="00000000-0000-0000-6827-CBEFF4BA74B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-98mz~4u82~4c4p"><intent_id>1007166</intent_id><project_id>893289</project_id><text_data>Contract amount is 151,424.54. The website wouldn't allow me to put that amount in for some reason so I checked the 'time and materials' box instead.</text_data><comment_date>2019-09-13T00:00:00</comment_date></row><row _id="row-8u97~qz4w.ynrz" _uuid="00000000-0000-0000-16D5-AA1C3D172698" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8u97~qz4w.ynrz"><intent_id>689096</intent_id><project_id>759989</project_id><text_data>Subtier: Edmonds Sec &amp; CommGeoff Neff</text_data><comment_date>2015-04-15T00:00:00</comment_date></row><row _id="row-j92n_js3p_iwdr" _uuid="00000000-0000-0000-4C98-67D2585EF92B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j92n_js3p_iwdr"><intent_id>911152</intent_id><project_id>853353</project_id><text_data>Filed by Evelyn Felton</text_data><comment_date>2018-06-13T00:00:00</comment_date></row><row _id="row-6w2f.cjnj.b8cc" _uuid="00000000-0000-0000-439B-9D2ECB7A659B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6w2f.cjnj.b8cc"><intent_id>1528883</intent_id><project_id>1182013</project_id><text_data>North Kitsap SD 304501</text_data><comment_date>2025-04-21T00:00:00</comment_date></row><row _id="row-zk4c-qr3n~pji2" _uuid="00000000-0000-0000-EAB5-5DDD8D9C7111" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zk4c-qr3n~pji2"><intent_id>731125</intent_id><project_id>768137</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborers Union)Other Trucks: Lowbed - Mobilization of equipment (Teamsters Union)</text_data><comment_date>2015-11-11T00:00:00</comment_date></row><row _id="row-q4th_tkwx.y77i" _uuid="00000000-0000-0000-707E-9E233599EDD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q4th_tkwx.y77i"><intent_id>1277520</intent_id><project_id>1036902</project_id><text_data>PO: PW Pasco Public Works at 3416 N Stearman Ave, Pasco. 10/3/22 Checked out the water leak. Picked up new needle valve. Replaced the needle valve and fittings on both ends of the water line to the ice maker.</text_data><comment_date>2022-10-25T00:00:00</comment_date></row><row _id="row-gbsw~rnzg~sqxy" _uuid="00000000-0000-0000-4367-E284CA4270F0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbsw~rnzg~sqxy"><intent_id>811900</intent_id><project_id>773126</project_id><text_data>We have workers comp in Oregon with liberty mutual</text_data><comment_date>2017-01-19T00:00:00</comment_date></row><row _id="row-895t_bumr_q9qv" _uuid="00000000-0000-0000-CDB7-4DB9B1C7AB2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-895t_bumr_q9qv"><intent_id>988379</intent_id><project_id>885876</project_id><text_data>ACI Job No. 19-019</text_data><comment_date>2019-06-28T00:00:00</comment_date></row><row _id="row-9aem_2d2h.ptqi" _uuid="00000000-0000-0000-F79F-830146357433" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9aem_2d2h.ptqi"><intent_id>534202</intent_id><project_id>678679</project_id><text_data>The general laborers performed the following duties:-grinding paint from railing-cutting panels-anchoring bolts for landing-assisting Tim (ironworker)</text_data><comment_date>2012-09-17T00:00:00</comment_date></row><row _id="row-jh39-cmv5~aw7p" _uuid="00000000-0000-0000-0D88-02ACC8F2E7AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jh39-cmv5~aw7p"><intent_id>1108893</intent_id><project_id>942982</project_id><text_data>The Project number 232624 is incorrect. The correct Project number Contract number is 232073. Requested by Stephanie Todd.</text_data><comment_date>2020-12-10T00:00:00</comment_date></row><row _id="row-h5tt.gigh-iwq2" _uuid="00000000-0000-0000-FF4F-F24A99B2D5E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h5tt.gigh-iwq2"><intent_id>636969</intent_id><project_id>735101</project_id><text_data>We have workers comp insurance with liberty nw in oregon</text_data><comment_date>2014-06-24T00:00:00</comment_date></row><row _id="row-naug_a3y3-e4ec" _uuid="00000000-0000-0000-24A4-A1C51D6FEF53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-naug_a3y3-e4ec"><intent_id>634239</intent_id><project_id>736756</project_id><text_data>LR 6/10/2014</text_data><comment_date>2014-06-10T00:00:00</comment_date></row><row _id="row-bjac.9gnz-ajnq" _uuid="00000000-0000-0000-D81A-9908B00828B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjac.9gnz-ajnq"><intent_id>504561</intent_id><project_id>684526</project_id><text_data>We are cleaning the heating systems on these homes, both furnace and ductwork.</text_data><comment_date>2012-03-22T00:00:00</comment_date></row><row _id="row-m7ud.hqtw~n8fm" _uuid="00000000-0000-0000-8EED-B538C8B0B3C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7ud.hqtw~n8fm"><intent_id>450001</intent_id><project_id>663720</project_id><text_data>The whole project is Landscape Maintenance - which is our part!! We will be mowing the lawns &amp; pulling weeds.</text_data><comment_date>2011-04-14T00:00:00</comment_date></row><row _id="row-niwm-3d6b~wscv" _uuid="00000000-0000-0000-69B5-EAD7EE9E911B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-niwm-3d6b~wscv"><intent_id>552155</intent_id><project_id>701061</project_id><text_data>PENSION- $6.33 PER HOURMEDICAL - $5.25 PER HOURER401K - .50 PER HOURAPPRENTICE PROGRAM - .54 PER HOUR</text_data><comment_date>2013-01-15T00:00:00</comment_date></row><row _id="row-asiq.jht2-wqay" _uuid="00000000-0000-0000-7B4B-70399729C5AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-asiq.jht2-wqay"><intent_id>528068</intent_id><project_id>688847</project_id><text_data>It appears your company may not be properly calculating worker fringe benefits. By separate email we are sending you a document that explains the benefits calculation process acceptable to the department. Please review that document and adjust your procedures as necessary. Approval of this form does not constitute approval of the methodology your company is using in determining the amount of such contributions. We reserve the right to investigate further the issue on this and future forms that your company submits on which the benefits calculation appears erroneous. If you have questions, please contact Marcus Ehrlander at (360) 902-5334 or marcus.ehrlander@Lni.wa.gov.</text_data><comment_date>2012-10-09T00:00:00</comment_date></row><row _id="row-u9vh~4vdg.frhj" _uuid="00000000-0000-0000-EE3D-2AADE8E89B89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u9vh~4vdg.frhj"><intent_id>673300</intent_id><project_id>752425</project_id><text_data>Clean vault of silt/water accumulationMotorPatrol Grader to vacuum are of all water and siltHazWaste Workers to clean area using brooms, shovels and/or small hand tools</text_data><comment_date>2015-01-13T00:00:00</comment_date></row><row _id="row-tgiy~jdwx-wfg5" _uuid="00000000-0000-0000-B1E9-889415569347" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tgiy~jdwx-wfg5"><intent_id>463697</intent_id><project_id>604533</project_id><text_data>Briar Group Inc.  provided hydroseeding only on this project.  We installed a lawn application on site as directed which would provide beautification of the site.</text_data><comment_date>2011-07-20T00:00:00</comment_date></row><row _id="row-yszn_qejt-sva5" _uuid="00000000-0000-0000-F9D7-9ACA6B782EFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yszn_qejt-sva5"><intent_id>1130264</intent_id><project_id>948423</project_id><text_data>Install topsoil, wood chip mulch and ground cover planting, 4' plugs. Any heavy machinery will be performed by Owner/operator, placing topsoil and bark with CAD truck. Laborers will spread topsoil, wood chips and 4' plugs (Plants)with hand tools. Shovel's and rakes</text_data><comment_date>2021-03-21T00:00:00</comment_date></row><row _id="row-9cgf~niix.w9kj" _uuid="00000000-0000-0000-C6B5-7E310F47BD7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9cgf~niix.w9kj"><intent_id>847000</intent_id><project_id>826940</project_id><text_data>Looks like I mixed up the wage and fringe numbers above. I made the correction.</text_data><comment_date>2017-07-20T00:00:00</comment_date></row><row _id="row-cen3-4dti.brhm" _uuid="00000000-0000-0000-24D3-23B047A03E83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cen3-4dti.brhm"><intent_id>934116</intent_id><project_id>861924</project_id><text_data>Prevailing wage issues are very fact specific. In order for us to evaluate if the work to be performed by worker classification listed is not covered for the project name project, we need to know more about the project and the tasks your employees perform in conjunction with this project. Please provide us with the following information:1. What is the specific purpose of this awarding agency�s public works project? Examples are:  Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc.2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See  WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)]3. Does this specific project entail the remodeling or new construction of a facility?4. If your firm is working upon a type of building system, what type of system is involved?  Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.5. What specific tasks will your employees perform? 6. What, if any, tools will your employees use in the performance of those tasks?7. If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? 8. Are you going to be hiring any subcontractors for this project?9. When is your work to be completed? Planning or preconstruction phase or during the public works project?Software engineer � Programmer            Enumclaw School District1.	Perform maintenance services � software &amp; computer for the HVAC controls 2.	No.3.	No.4.	Sound energy Systems performs the maintenance for the HVAC Controls System5.	Our employee will be using HVAC Control Workstation6.	Our employee will be using HVAC Controls Workstation.7.	No.8.	No.9.	Maintenance Agreement on the HVAC Control System. No completion date</text_data><comment_date>2018-09-26T00:00:00</comment_date></row><row _id="row-msa2~cdd9.875g" _uuid="00000000-0000-0000-F806-1A1DADDF7754" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-msa2~cdd9.875g"><intent_id>1004915</intent_id><project_id>880522</project_id><text_data>All work is performed inside. The scope of work includes voice and data installation as well as audio visual installation</text_data><comment_date>2019-09-05T00:00:00</comment_date></row><row _id="row-qbau-j6b3-zdk7" _uuid="00000000-0000-0000-FA72-FD8D18BA52CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbau-j6b3-zdk7"><intent_id>522316</intent_id><project_id>685732</project_id><text_data>drop down will not save telecom tech as a choice</text_data><comment_date>2012-07-14T00:00:00</comment_date></row><row _id="row-vefv.7tpw_tnen" _uuid="00000000-0000-0000-757C-E79332693567" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vefv.7tpw_tnen"><intent_id>1010928</intent_id><project_id>884189</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2019-09-30T00:00:00</comment_date></row><row _id="row-pkqf_xawe-mvqf" _uuid="00000000-0000-0000-9781-5AB9E9901940" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pkqf_xawe-mvqf"><intent_id>719510</intent_id><project_id>771082</project_id><text_data>TOTAL FRINGE IS SENT TO A QUALIFIED PENSION PLAN, PLAN IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2015-09-08T00:00:00</comment_date></row><row _id="row-88xs_ivrt-2heb" _uuid="00000000-0000-0000-4F4F-8BF463E6650C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-88xs_ivrt-2heb"><intent_id>709928</intent_id><project_id>768285</project_id><text_data>Project description per bid docs:  Construction of Duwamish Hill Preserve Phase 2 habitiat restoration including but not limited to excavation, clearing and grubbing, erosion controls; grading;hauling excess soil; cultural resource protection;minor sidewalk repair, soil preparation; plant purchase and installation; lawn installation; irrigation installation; landscape maintenance and weed control, specialized concrete paving; crushed rock paving; habitat elements; boulder placement and other work necessary to complete the work as specified as shown in Contract Documents.Specific landscape elements include installation of 59 large trees, 5,088 Savanna plants, 7,745 wet meadow plants, 9,950 wetland plants, 400cy of wood chip mulch,  793cy of compost, 14,102sf of seeded lawn areas and finally, installation of irrigation system for all of the above.</text_data><comment_date>2015-07-27T00:00:00</comment_date></row><row _id="row-v92b.y6uz.dm5g" _uuid="00000000-0000-0000-853E-9124CE5A94C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v92b.y6uz.dm5g"><intent_id>726207</intent_id><project_id>774584</project_id><text_data>W. Smith Road #32, Bellingham1. Air seal, attic blow, duct seal, belly blow		2. Single family		3. 1		4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No		5. Yes		6. Yes		7. Yes		8. No</text_data><comment_date>2015-10-14T00:00:00</comment_date></row><row _id="row-tapm_wz3v.bkh7" _uuid="00000000-0000-0000-0539-DCCCA1B6CB16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tapm_wz3v.bkh7"><intent_id>1157264</intent_id><project_id>969117</project_id><text_data>1.     Install DHP 2. Y 3. 1 4. residence a.n b. n c. y d.n e. n f. n g. n h. n i. n j. n k. n l. n 5. y 6. y 7. n 8 n</text_data><comment_date>2021-07-01T00:00:00</comment_date></row><row _id="row-yidf-mx7g-fct4" _uuid="00000000-0000-0000-8548-558BD712E2BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yidf-mx7g-fct4"><intent_id>1017787</intent_id><project_id>892152</project_id><text_data>Port Madison Enterprises Construction Corp. is a Native American tribally owned company and not required to have an industrial account#.</text_data><comment_date>2019-10-30T00:00:00</comment_date></row><row _id="row-ne3t.g9tz~7qn3" _uuid="00000000-0000-0000-65D6-963C8ED4C284" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ne3t.g9tz~7qn3"><intent_id>969320</intent_id><project_id>877456</project_id><text_data>Start date of 5/1/2019</text_data><comment_date>2019-04-03T00:00:00</comment_date></row><row _id="row-igjh~j5bu.5v2v" _uuid="00000000-0000-0000-6ED1-79F60B1A2CE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-igjh~j5bu.5v2v"><intent_id>1122976</intent_id><project_id>950904</project_id><text_data>9837685</text_data><comment_date>2021-02-17T00:00:00</comment_date></row><row _id="row-is33_h9ut-5azm" _uuid="00000000-0000-0000-9A82-860A845923A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-is33_h9ut-5azm"><intent_id>1509765</intent_id><project_id>1170576</project_id><text_data>jobs: Wackerly, Driscoll#1 - heat pump installation including electrical for heat pump installation #2 - single family dwelling #3 - 1 #4 - residence (a) no c) yes (d)no (e) no (f) no (g)no (h)no (i) no (j) no (k) no #5 - yes #6 - yes #7 - no #8 - no</text_data><comment_date>2025-02-13T00:00:00</comment_date></row><row _id="row-75ag.y65x~u7ka" _uuid="00000000-0000-0000-34A0-0DD85C7E6F9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-75ag.y65x~u7ka"><intent_id>785241</intent_id><project_id>799377</project_id><text_data>specific description of work: Landscaping for beautification. Spreading topsoil, planting plants, spreading beautification bark mulch, and seeding. The above work will be completed with the use of wheelbarrows and shovels for spreading topsoil and beautification bark. Wheelbarrows and shovels for transporting plant material into planting areas, and planting plants. F-250 crew cab work truck to transport work crew to and from work site.</text_data><comment_date>2016-09-02T00:00:00</comment_date></row><row _id="row-bfsy-tkre.wjz6" _uuid="00000000-0000-0000-8CEF-6A33B1DF0806" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bfsy-tkre.wjz6"><intent_id>963136</intent_id><project_id>857787</project_id><text_data>Centennial Contractors Enterprises Inc is filing on behalf of Modern Overlay LLC  due to failure to file.</text_data><comment_date>2019-03-04T00:00:00</comment_date></row><row _id="row-gvj7-m5fk~bzmm" _uuid="00000000-0000-0000-EA2B-BE2663A34576" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gvj7-m5fk~bzmm"><intent_id>962695</intent_id><project_id>874381</project_id><text_data>Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2019-02-28T00:00:00</comment_date></row><row _id="row-8vkc_y24d~bny3" _uuid="00000000-0000-0000-498E-DE355706B7B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8vkc_y24d~bny3"><intent_id>614418</intent_id><project_id>728354</project_id><text_data>010482D1 Pak 10909 98th St. SW Lakewood, WA 98489</text_data><comment_date>2014-01-30T00:00:00</comment_date></row><row _id="row-9zth-9zjv-fbxf" _uuid="00000000-0000-0000-6234-A1D466974050" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9zth-9zjv-fbxf"><intent_id>1223940</intent_id><project_id>1007482</project_id><text_data>OTHER TRUCKS CONSIST OF A LOWBED TRACTOR AND TRAILER TO MOBILIZE EQUIPMENT</text_data><comment_date>2022-04-07T00:00:00</comment_date></row><row _id="row-dbmw~97xk-ag5f" _uuid="00000000-0000-0000-ACF1-040145F5858C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dbmw~97xk-ag5f"><intent_id>690670</intent_id><project_id>756153</project_id><text_data>Truck F350 - 1 Ton.  Purpose: Roadside sprayer. Controls are inside vehicle so that the driver is spraying while vehicle moves.</text_data><comment_date>2015-04-23T00:00:00</comment_date></row><row _id="row-q6rh-97dg_x9e3" _uuid="00000000-0000-0000-C7F4-7732A3B6FD85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q6rh-97dg_x9e3"><intent_id>1222789</intent_id><project_id>1001634</project_id><text_data>What is the specific purpose of this awarding agency�s public works project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc.     Furnish and install Metasys hardware and software, programming and commissioning  2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)] No3. Does this specific project entail the remodeling or new construction of a facility? No4. If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc. HVAC controls5. What specific tasks will your employees perform? Installing network hardware on field controllers, programming. and commissioning6. What, if any, tools will your employees use in the performance of those tasks? None - Computer7. If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? No8. Are you going to be hiring any subcontractors for this project? No9. When is your work to be completed? Planning or preconstruction phase or during the public works project? Planning and during? During</text_data><comment_date>2022-04-04T00:00:00</comment_date></row><row _id="row-28k6-v5up_g56f" _uuid="00000000-0000-0000-6E31-5CE1378D8775" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-28k6-v5up_g56f"><intent_id>746152</intent_id><project_id>784457</project_id><text_data>Truck is an F550 used to transport equipment to and from the job site</text_data><comment_date>2016-02-11T00:00:00</comment_date></row><row _id="row-vpm3_fjx8_7gdn" _uuid="00000000-0000-0000-44F8-501E97B9718E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vpm3_fjx8_7gdn"><intent_id>740315</intent_id><project_id>782076</project_id><text_data>install flush mount furniture feed and receptacles, circuit to feed floor boxes(1159946)</text_data><comment_date>2016-01-06T00:00:00</comment_date></row><row _id="row-4bmi~2yfr-pfty" _uuid="00000000-0000-0000-C1BF-BE9617ED6264" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4bmi~2yfr-pfty"><intent_id>1225648</intent_id><project_id>995869</project_id><text_data>Washington State School for the Blind Life Skills Center ProjectIrrigation: ? Provide and install design-build irrigation system? Includes sleeving material and installation with trenching up to 24� depth? Includes backflow device, successful test, programming, and operator trainingLandscape: ? Test and amend site/imported topsoil placed by others (Dan Jones Supplier) Topsoil in planting beds at 24' depths, topsoil in lawn at 12' depth? Provide and install plants and shrubs per plan? Provide and install trees per plan? Provide and install up to 70� of root barrier? Provide and place up to 8 units of mulch at 2� depth? Seed per plan/spec? Clean up and removal of landscape installation debris</text_data><comment_date>2022-04-14T00:00:00</comment_date></row><row _id="row-fw7k_h2ie.4ewp" _uuid="00000000-0000-0000-A46D-4FDCFD366995" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fw7k_h2ie.4ewp"><intent_id>898603</intent_id><project_id>796084</project_id><text_data>Hydroseeding is for Beautification</text_data><comment_date>2018-04-13T00:00:00</comment_date></row><row _id="row-y9zd.wpa6~ybbf" _uuid="00000000-0000-0000-8568-C06C379F3DF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y9zd.wpa6~ybbf"><intent_id>669843</intent_id><project_id>750765</project_id><text_data>BOA Contract Number = 635344Work Release Number = 09 - Mod Nine (9)Work Releaes Date = 12/18/14Pass Port Number = 329849</text_data><comment_date>2014-12-15T00:00:00</comment_date></row><row _id="row-ds38.8y7w_mpy9" _uuid="00000000-0000-0000-0DDF-8F3044B7D5AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ds38.8y7w_mpy9"><intent_id>877157</intent_id><project_id>816385</project_id><text_data>ASI is a sister company of Thrislington U. LLC d/b/a European Cubciles and completes the labor.</text_data><comment_date>2017-12-01T00:00:00</comment_date></row><row _id="row-4xxd~bu5i.7nmu" _uuid="00000000-0000-0000-3F8C-99132BD43A24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4xxd~bu5i.7nmu"><intent_id>841176</intent_id><project_id>824631</project_id><text_data>Box truck and lift gate truck.</text_data><comment_date>2017-06-26T00:00:00</comment_date></row><row _id="row-m8dx~u83n_hswi" _uuid="00000000-0000-0000-66F0-2BF70FDAB7D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m8dx~u83n_hswi"><intent_id>450608</intent_id><project_id>663160</project_id><text_data>Correction: This job will consist of irrigation, top soil placement and planting of trees and shrubs.  Irrigation depth will be 2' 18&amp;quot;.  Equipment used will be a light duty skid steer bobcat with a weight of approx. 4,500-9,000 lbs.  We will first install irrigation, next we will place the topsoil and last will be the planting of the trees and shrubs.</text_data><comment_date>2011-05-03T00:00:00</comment_date></row><row _id="row-yrkw-n58i~case" _uuid="00000000-0000-0000-B799-74BCE138061F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yrkw-n58i~case"><intent_id>1031083</intent_id><project_id>898450</project_id><comment_date>2020-01-10T00:00:00</comment_date></row><row _id="row-zm5n-8d9x.m38n" _uuid="00000000-0000-0000-B486-4F0459D089F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zm5n-8d9x.m38n"><intent_id>1081903</intent_id><project_id>902603</project_id><text_data>order A55888</text_data><comment_date>2020-08-20T00:00:00</comment_date></row><row _id="row-g3au~b33h~5sq8" _uuid="00000000-0000-0000-56D4-898E4673BB99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g3au~b33h~5sq8"><intent_id>1061523</intent_id><project_id>887556</project_id><text_data>1.Finish Carpentry, door and trim installation.  2. Apartments.  3. 4 stories.  4. (a) no; (b) no; (c) Yes; (d) no; (e) no; (f) no; (g) no; (h) no; (I) no; (j) no; (k) yes; (l) no.  5.Yes.  6. yes.  7. yes.  8. no.</text_data><comment_date>2020-05-30T00:00:00</comment_date></row><row _id="row-bj9f.k6ez_vmd2" _uuid="00000000-0000-0000-CBA4-83CC5A19C3DE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bj9f.k6ez_vmd2"><intent_id>614434</intent_id><project_id>720781</project_id><text_data>Hydroseeding only</text_data><comment_date>2014-01-30T00:00:00</comment_date></row><row _id="row-b3e3-y6bf.ynnd" _uuid="00000000-0000-0000-B7D8-47BCDB7F5EC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b3e3-y6bf.ynnd"><intent_id>795580</intent_id><project_id>762164</project_id><text_data>We will be the subcontractor for the following:  Remove trees with chain saw, stump grind the 4 stumps, install 4 trees. Cut &amp; remove asphalt affected by heaving tree roots, cut &amp; remove tree roots. Clean up &amp; remove all work related debris off-site leaving the work area clean.</text_data><comment_date>2016-10-12T00:00:00</comment_date></row><row _id="row-vjyh-bejq_9hte" _uuid="00000000-0000-0000-F81E-1DBE2B518B05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vjyh-bejq_9hte"><intent_id>1003897</intent_id><project_id>891934</project_id><text_data>#1 � The electrican will be performing an electrical safety inspection#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2019-08-30T00:00:00</comment_date></row><row _id="row-i4by-2tkz_n2jn" _uuid="00000000-0000-0000-F6FA-80212521E2CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i4by-2tkz_n2jn"><intent_id>712679</intent_id><project_id>769298</project_id><text_data>#1 - install ductless heat pump #2 -yes #3 -1 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) no (b) no (c) yes (d) no(e) no (f) no (g) no (h)no (i)no (j)no (k) Other? #5 - yes #6 - yes #7 - no #8 - no</text_data><comment_date>2015-08-06T00:00:00</comment_date></row><row _id="row-nmpf-w89t-v4mq" _uuid="00000000-0000-0000-04A7-AF9B1C4AEA9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nmpf-w89t-v4mq"><intent_id>949878</intent_id><project_id>868286</project_id><text_data>Install a single zone ductless system</text_data><comment_date>2018-12-10T00:00:00</comment_date></row><row _id="row-xeby.ubmf~vqsb" _uuid="00000000-0000-0000-0101-70D980942326" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xeby.ubmf~vqsb"><intent_id>571765</intent_id><project_id>711898</project_id><text_data>Clarence Lewis2217 227th Place #10Ocean Park WA   98640P.O. # 21029   Job # 1375047</text_data><comment_date>2013-05-28T00:00:00</comment_date></row><row _id="row-f854~t4mt.enxz" _uuid="00000000-0000-0000-ED4B-96C9EB07A835" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f854~t4mt.enxz"><intent_id>1076483</intent_id><project_id>920756</project_id><text_data>LABORERS: $13.75H &amp; W  = $6.70Pension= $6.00                                                                                             Training= $0.95Trust     = $0.10OPERATORS: $18.75H &amp; W  = $8.05Pension= $9.95Training= $0.75TEAMSTERS: $18.15H &amp; W  = $10.30Pension= $ 7.20Training= $ 0.65</text_data><comment_date>2020-07-30T00:00:00</comment_date></row><row _id="row-6ini_g6vt.amyt" _uuid="00000000-0000-0000-3125-2413B6C86A44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ini_g6vt.amyt"><intent_id>961133</intent_id><project_id>836525</project_id><text_data>This work includes installation of topsoils, plantings, and mulching.</text_data><comment_date>2019-02-20T00:00:00</comment_date></row><row _id="row-9iyb~s5wc-9k6y" _uuid="00000000-0000-0000-0D2A-CCE02CFF2092" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9iyb~s5wc-9k6y"><intent_id>1195304</intent_id><project_id>982912</project_id><text_data>POWERCOM JOB #550284</text_data><comment_date>2021-11-24T00:00:00</comment_date></row><row _id="row-58ht~ek2z_kcbt" _uuid="00000000-0000-0000-58C7-B6611FCEF579" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-58ht~ek2z_kcbt"><intent_id>777034</intent_id><project_id>797805</project_id><text_data>OTHER TRUCK IS WATER TRUCK.</text_data><comment_date>2016-07-23T00:00:00</comment_date></row><row _id="row-pfqc~bc7v~ia6j" _uuid="00000000-0000-0000-FAE8-E24E0F9A8332" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pfqc~bc7v~ia6j"><intent_id>1281130</intent_id><project_id>1013357</project_id><text_data>#1 - Install Ductless Heat Pump. #2 - Multi Family Home Common Area #3 - Three levels #4 - Private Residence Homes #5 - Yes #6 - Yes #7 No #8 - No</text_data><comment_date>2022-11-03T00:00:00</comment_date></row><row _id="row-9vag-gmf8~uzya" _uuid="00000000-0000-0000-F7E7-065F9EE9EDFC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9vag-gmf8~uzya"><intent_id>757517</intent_id><project_id>789967</project_id><text_data>No access openings were required for this job, therefore no sheet metal workers were used.</text_data><comment_date>2016-04-20T00:00:00</comment_date></row><row _id="row-cfu8_wa69~b3ij" _uuid="00000000-0000-0000-0BDB-BAC2D5ADC547" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cfu8_wa69~b3ij"><intent_id>949184</intent_id><project_id>867990</project_id><text_data>WO #8014592</text_data><comment_date>2018-12-05T00:00:00</comment_date></row><row _id="row-whg5~sbdu~7km2" _uuid="00000000-0000-0000-4087-FD3606FAC62F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-whg5~sbdu~7km2"><intent_id>751244</intent_id><project_id>787158</project_id><text_data>Remove hazwaste items from derelict vesselHazWaste workers to remove hazardous materials from derelict vessel using brooms, shovels and hand held scrapers</text_data><comment_date>2016-03-14T00:00:00</comment_date></row><row _id="row-yua9-9u4p_8ins" _uuid="00000000-0000-0000-F056-BE2CC86B2853" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yua9-9u4p_8ins"><intent_id>801361</intent_id><project_id>806192</project_id><text_data>trucking services only.  project is remedial site work at king county housing site</text_data><comment_date>2016-11-14T00:00:00</comment_date></row><row _id="row-5k2j~brzk.nbu6" _uuid="00000000-0000-0000-0DEA-B405B54A264F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5k2j~brzk.nbu6"><intent_id>1285284</intent_id><project_id>1009727</project_id><comment_date>2022-11-21T00:00:00</comment_date></row><row _id="row-gcby_8zmz~4gbh" _uuid="00000000-0000-0000-0011-A952BD2A2423" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcby_8zmz~4gbh"><intent_id>993257</intent_id><project_id>868482</project_id><text_data>FILED BY JAN MAYRHOF</text_data><comment_date>2019-07-19T00:00:00</comment_date></row><row _id="row-gbzu~cbvz_wssk" _uuid="00000000-0000-0000-DA5B-BE50C366E3EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gbzu~cbvz_wssk"><intent_id>672340</intent_id><project_id>745776</project_id><text_data>THIS IS A LANDSCAPE RENOVATION JOB FOR 7 APARTMENT COMPLEXES FOR THE EVERETT HOUSING AUTHORITY. WE WILL BE INSTALLING NEW LAWN,PLANTS AND AND TREES. REMOVING TWO PLAY STRUCTURES AND DIGGING OUT FOR DIDEWALKS AND ADDING 6&amp;quot; OF GRAVEL FOR THE CONCRETE.</text_data><comment_date>2015-01-06T00:00:00</comment_date></row><row _id="row-ivqv~hyjy_khuh" _uuid="00000000-0000-0000-FC35-4DA3CB091035" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ivqv~hyjy_khuh"><intent_id>1195011</intent_id><project_id>970963</project_id><text_data>1521313</text_data><comment_date>2021-11-23T00:00:00</comment_date></row><row _id="row-p87n~pcck~49n8" _uuid="00000000-0000-0000-CD5A-9C5330E55150" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p87n~pcck~49n8"><intent_id>1021848</intent_id><project_id>899590</project_id><text_data>FILED BY R.T. VATNE</text_data><comment_date>2019-11-14T00:00:00</comment_date></row><row _id="row-a47g~yvq6_xnhm" _uuid="00000000-0000-0000-A93D-19434E813C34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a47g~yvq6_xnhm"><intent_id>1118685</intent_id><project_id>948502</project_id><text_data>$12.38 medical, $1.18 dental, $1.42 vacation, $0.12 holiday, $1.48 401k</text_data><comment_date>2021-02-08T00:00:00</comment_date></row><row _id="row-k8uu.74c4~mvkr" _uuid="00000000-0000-0000-ACD8-966270BAB03B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k8uu.74c4~mvkr"><intent_id>693750</intent_id><project_id>761927</project_id><text_data>Filed by Gordon Rottinghaus</text_data><comment_date>2015-05-11T00:00:00</comment_date></row><row _id="row-xxeh-83qc-vqgf" _uuid="00000000-0000-0000-FC86-EC8B98038F24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xxeh-83qc-vqgf"><intent_id>1077636</intent_id><project_id>927898</project_id><text_data>SEE PROJECT DESCRIPTION</text_data><comment_date>2020-08-04T00:00:00</comment_date></row><row _id="row-sstu-efma.p9qf" _uuid="00000000-0000-0000-4243-24EB29E8AA53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sstu-efma.p9qf"><intent_id>632604</intent_id><project_id>735905</project_id><text_data>Surface and Stripe Running Track</text_data><comment_date>2014-06-02T00:00:00</comment_date></row><row _id="row-7udq~yqxe_zd7d" _uuid="00000000-0000-0000-DE5D-573A71AD5347" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7udq~yqxe_zd7d"><intent_id>958846</intent_id><project_id>872537</project_id><text_data>Prevailing wage plus health insurance</text_data><comment_date>2019-02-05T00:00:00</comment_date></row><row _id="row-bi7n-7wj7.8i93" _uuid="00000000-0000-0000-66EC-948E22291CBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bi7n-7wj7.8i93"><intent_id>875497</intent_id><project_id>826640</project_id><text_data>ACI Job #17-015</text_data><comment_date>2017-11-17T00:00:00</comment_date></row><row _id="row-q8x6-hcze-kiua" _uuid="00000000-0000-0000-E813-3FD097C52677" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8x6-hcze-kiua"><intent_id>474599</intent_id><project_id>673140</project_id><text_data>Work performed will be to install irrigation and plants for landscaping.  Tools used will be shovels, rakes, and other hand tools associated with planting.</text_data><comment_date>2011-08-26T00:00:00</comment_date></row><row _id="row-c9es~djc3.56vq" _uuid="00000000-0000-0000-6469-0A663BC94809" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9es~djc3.56vq"><intent_id>1131261</intent_id><project_id>955620</project_id><text_data>9863675   11619</text_data><comment_date>2021-03-24T00:00:00</comment_date></row><row _id="row-h9p2-d3ym~zv84" _uuid="00000000-0000-0000-D1A8-929D6904E300" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h9p2-d3ym~zv84"><intent_id>650257</intent_id><project_id>742723</project_id><text_data>The whole project was ours, we reconditioned and repaired 4,250 HP Propulsion electric motor including cleaning, testing, retreat fields and one armature, rewind and replace commutator on the other armature including replacement of the commutator equalizing risers, resurfaced both commutators, balance rotating assembly and prepare for shipping. All work was done with normal electric motor shop equipment.</text_data><comment_date>2014-08-26T00:00:00</comment_date></row><row _id="row-m7tj.2enf.qxy5" _uuid="00000000-0000-0000-52FB-897D1904A7EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7tj.2enf.qxy5"><intent_id>557904</intent_id><project_id>705783</project_id><text_data>POE - Pan Replacement (10 Rooftop Units)- Bldg 120Inv #7769 / Ordered by: Brian Menard</text_data><comment_date>2013-02-27T00:00:00</comment_date></row><row _id="row-deft_vxny~rm9f" _uuid="00000000-0000-0000-ED46-FB0253274E92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-deft_vxny~rm9f"><intent_id>1270126</intent_id><project_id>1032949</project_id><text_data>WORK FOR PAUL ANDERSON @ CHAPIN EAST</text_data><comment_date>2022-09-27T00:00:00</comment_date></row><row _id="row-w86b_h49u.9qpx" _uuid="00000000-0000-0000-9CB1-44322F0EB180" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w86b_h49u.9qpx"><intent_id>650293</intent_id><project_id>742739</project_id><text_data>The scope of work includes:1. Main distribution frame (MDF) assembly. 2. Intermediate distribution frame (IDF) assembly.          3. Installation of Cat6 cable, riser cables, distribution cables and inside wires between the outlet and the connection to the distribution frame.Work to be performed indoors on a telephone (voice over distance) and/or data (bits and bytes) system located inside the point of demarcation.</text_data><comment_date>2014-08-25T00:00:00</comment_date></row><row _id="row-n8pp-hxhh-mpp8" _uuid="00000000-0000-0000-5A64-F61E6A1C4D9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n8pp-hxhh-mpp8"><intent_id>1270334</intent_id><project_id>1015707</project_id><text_data>MMFS -  63222047</text_data><comment_date>2022-09-28T00:00:00</comment_date></row><row _id="row-sjzh.7vik~fhz5" _uuid="00000000-0000-0000-3B4D-1132F8FEF82A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sjzh.7vik~fhz5"><intent_id>1213866</intent_id><project_id>1000965</project_id><text_data>94759</text_data><comment_date>2022-02-25T00:00:00</comment_date></row><row _id="row-9yjj~qga4-u3gg" _uuid="00000000-0000-0000-5EC9-CF40AE1ABA6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9yjj~qga4-u3gg"><intent_id>1193685</intent_id><project_id>988261</project_id><text_data>#1- install heat pump #2-Yes; #3-One; #4a-No; #4b-No; #4c-Yes; #4d-No; #4e-No; #4f-No; #4g-No; #4h-No; #4i-No; #4j-No; #4k-No; #4l-None; #5-Yes; #6-Yes; #7-No; #8-No</text_data><comment_date>2021-11-16T00:00:00</comment_date></row><row _id="row-dm2g~u2ja~b83b" _uuid="00000000-0000-0000-3FDD-36131036209D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dm2g~u2ja~b83b"><intent_id>1153122</intent_id><project_id>952883</project_id><text_data>MOBILE HOME INSULATION #1 - Describe the work that your firm was contracted to perform. MOBILE HOME INSULATION#2 - Is the structure a single-family dwelling, duplex, apartment, condominium, or other residential structure? YES#3 - Including any basement or garage, how many stories or levels does the structure have? ONE#4 - What is the building used for? PRIMARY RESIDENCE Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(I) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on-site? NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2021-06-16T00:00:00</comment_date></row><row _id="row-q8da.ffxw-bwhi" _uuid="00000000-0000-0000-E42F-C6C18AE7B70D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8da.ffxw-bwhi"><intent_id>1317166</intent_id><project_id>1010489</project_id><text_data>Bella Terra will be planting approximately 11 shrubs and 150 groundcover for this project. We will also be installing an irrigation system.</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-jwih-nvsg~igue" _uuid="00000000-0000-0000-86B1-77AD34F2D9C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jwih-nvsg~igue"><intent_id>1248517</intent_id><project_id>1021607</project_id><text_data>LE 2204017</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-b46k~mfhe~dt2w" _uuid="00000000-0000-0000-FA7A-154889C4D557" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b46k~mfhe~dt2w"><intent_id>1004779</intent_id><project_id>892282</project_id><text_data>The trucks driven will be a F-550 flatbed that will transport material, E-350 to transport employees while on site, and 2-Chevy 2500s that will be used to move material</text_data><comment_date>2019-09-25T00:00:00</comment_date></row><row _id="row-frzh-5h4s_4sh6" _uuid="00000000-0000-0000-056E-476DEA2B66D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-frzh-5h4s_4sh6"><intent_id>463699</intent_id><project_id>669238</project_id><text_data>Will start after fingerprinting is approved by FBI</text_data><comment_date>2011-06-30T00:00:00</comment_date></row><row _id="row-8yn2_u73r-utv5" _uuid="00000000-0000-0000-24C7-395F4F0FA992" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yn2_u73r-utv5"><intent_id>1095851</intent_id><project_id>935933</project_id><text_data>Providing the beautification of playgrounds adjacent to schools using a blower/mulch truck. Blowing in EWF/playchips into designated areas.</text_data><comment_date>2020-10-14T00:00:00</comment_date></row><row _id="row-kwkz.yem4.ckre" _uuid="00000000-0000-0000-658C-5140EEF5B191" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kwkz.yem4.ckre"><intent_id>993574</intent_id><project_id>848693</project_id><text_data>Waterproof Deck Company LLC did not pay any wages for work done on this project. Our employees did not work on this project. All work was sub-contracted out to Misner Construction.</text_data><comment_date>2019-07-22T00:00:00</comment_date></row><row _id="row-6etq_f6q8.2hbm" _uuid="00000000-0000-0000-E0DC-F0E847508C54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6etq_f6q8.2hbm"><intent_id>783079</intent_id><project_id>783664</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2016-08-17T00:00:00</comment_date></row><row _id="row-k92m.kdfv-driq" _uuid="00000000-0000-0000-BCEC-22363D7B3D86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k92m.kdfv-driq"><intent_id>962553</intent_id><project_id>874029</project_id><text_data>60963</text_data><comment_date>2019-02-28T00:00:00</comment_date></row><row _id="row-qm7p.gszh-kbj9" _uuid="00000000-0000-0000-5BA8-3C2B22710EFD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qm7p.gszh-kbj9"><intent_id>689255</intent_id><project_id>748254</project_id><text_data>HIRED BY SUB PACIFIC FOUNDATION</text_data><comment_date>2015-04-15T00:00:00</comment_date></row><row _id="row-mhkt.gx83~yams" _uuid="00000000-0000-0000-FBB0-2407DC12F85A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mhkt.gx83~yams"><intent_id>497687</intent_id><project_id>618900</project_id><text_data>Cleaning windows inside and outside. General cleanig interior of the building.</text_data><comment_date>2012-02-28T00:00:00</comment_date></row><row _id="row-5b5c~ivza.44nv" _uuid="00000000-0000-0000-CFF4-E9EE0AC1B700" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5b5c~ivza.44nv"><intent_id>1211922</intent_id><project_id>999805</project_id><text_data>53305</text_data><comment_date>2022-02-16T00:00:00</comment_date></row><row _id="row-gfkv~sttq~zv49" _uuid="00000000-0000-0000-92A1-73470942D39A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfkv~sttq~zv49"><intent_id>514867</intent_id><project_id>669382</project_id><text_data>PENSION - 5.50/HRHEALTH/WELFARE - 6.91/HRAPPRENTICESHIP - .67/HRSUBSTANCE ABUSE PROGRAM - .06/HRSTEP 1 APPRENTICE DOES NOT HAVE PENSION</text_data><comment_date>2012-06-04T00:00:00</comment_date></row><row _id="row-kw64_rdu5~5qcc" _uuid="00000000-0000-0000-ED8F-35C047BD4E96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kw64_rdu5~5qcc"><intent_id>1223453</intent_id><project_id>1007140</project_id><text_data>12184 2022 agreement</text_data><comment_date>2022-04-06T00:00:00</comment_date></row><row _id="row-giry_cdii~z6s4" _uuid="00000000-0000-0000-F011-7F74C7A22233" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-giry_cdii~z6s4"><intent_id>729257</intent_id><project_id>775790</project_id><text_data>Job # 8005004</text_data><comment_date>2015-10-30T00:00:00</comment_date></row><row _id="row-csxr.epje_jxkh" _uuid="00000000-0000-0000-E14D-D729DB6B3729" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-csxr.epje_jxkh"><intent_id>1028016</intent_id><project_id>850155</project_id><comment_date>2019-12-19T00:00:00</comment_date></row><row _id="row-cxrw~dcg7~gktm" _uuid="00000000-0000-0000-049A-ADE19FCB2103" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxrw~dcg7~gktm"><intent_id>1509328</intent_id><project_id>1170312</project_id><text_data>Other Truck: 4000 gallon on road. Water truck use for dust control and compaction.</text_data><comment_date>2025-02-12T00:00:00</comment_date></row><row _id="row-dgs3.ch72-7vg5" _uuid="00000000-0000-0000-1095-1146D0F8640A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgs3.ch72-7vg5"><intent_id>1530636</intent_id><project_id>1172628</project_id><text_data>126456-001</text_data><comment_date>2025-04-25T00:00:00</comment_date></row><row _id="row-m3ig_kyf7.et9h" _uuid="00000000-0000-0000-7AF0-27740EE7580D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m3ig_kyf7.et9h"><intent_id>467108</intent_id><project_id>670515</project_id><text_data>As you are aware, our current processing method for the type of contracts that it appears is utilized here is to require that the contractor and each and every subcontractor file an Intent for their first work under the contract (for instance the first call-out for the contractor).  To further meet the requirements in statute, an Affidavit must be filed by each and every contractor and subcontractor following completion of each project (meaning following completion of each and every work order or call-out).  In addition, if you are acting at the prime contractor, you must ensure that all subcontractors follow the outlined procedures.Please be sure to follow this process to avoid future delay in form approval and payment based on that approval.  (RCW 39.12.040)</text_data><comment_date>2011-10-27T00:00:00</comment_date></row><row _id="row-74xd.mvqk-rruv" _uuid="00000000-0000-0000-4338-EB9736E75AF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74xd.mvqk-rruv"><intent_id>476159</intent_id><project_id>666440</project_id><text_data>We are an Oregon company with employees residing in Oregon Only.  We are not required to have an Industrial Insurance L&amp;I account per your L&amp;I Department.</text_data><comment_date>2011-09-02T00:00:00</comment_date></row><row _id="row-rirw~5h2d~3i9t" _uuid="00000000-0000-0000-81E4-1F90D5FD48E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rirw~5h2d~3i9t"><intent_id>1033663</intent_id><project_id>884418</project_id><text_data>Wash track surface using Laymor and  power washer</text_data><comment_date>2020-01-24T00:00:00</comment_date></row><row _id="row-hmzu~xfx7_q64a" _uuid="00000000-0000-0000-4A54-9FF155ACA432" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hmzu~xfx7_q64a"><intent_id>743283</intent_id><project_id>762353</project_id><text_data>Aracely Campos205 S 60th AveYakima, WA 98902509-901-2732</text_data><comment_date>2016-01-25T00:00:00</comment_date></row><row _id="row-k3fj.4dtc~p7kn" _uuid="00000000-0000-0000-69FB-AB3A8BFF2841" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k3fj.4dtc~p7kn"><intent_id>934771</intent_id><project_id>858650</project_id><text_data>street sweeper</text_data><comment_date>2018-09-23T00:00:00</comment_date></row><row _id="row-q2pw~4mk9-g9iz" _uuid="00000000-0000-0000-2688-96A678775412" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q2pw~4mk9-g9iz"><intent_id>957237</intent_id><project_id>840001</project_id><text_data>This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.</text_data><comment_date>2019-02-05T00:00:00</comment_date></row><row _id="row-3b2r.38vx.9qiz" _uuid="00000000-0000-0000-AFD7-E72963A4D896" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3b2r.38vx.9qiz"><intent_id>668958</intent_id><project_id>734081</project_id><text_data>Work performed by the Telecommunication Technicians is installing Cat6 cabling for data indoors.  The purpose of the data cabling being installed is for computer networking.  Location 17801 International Blvd, Seatac, WA  98158</text_data><comment_date>2015-01-15T00:00:00</comment_date></row><row _id="row-pdbk-7pv9-3z62" _uuid="00000000-0000-0000-6216-3B8CD8C9C8EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pdbk-7pv9-3z62"><intent_id>959145</intent_id><project_id>840842</project_id><text_data>Called Contractor Registration number has been fixed.</text_data><comment_date>2019-02-08T00:00:00</comment_date></row><row _id="row-vh5t.6dxb-nw6w" _uuid="00000000-0000-0000-F92D-0273D2A6F3DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vh5t.6dxb-nw6w"><intent_id>571924</intent_id><project_id>711963</project_id><text_data>The entire project consists of planting 34 trees.  We will be removing material and adding back topsoil to a depth not to exceed 36&amp;quot;.  We will be using a mini excavator and shovels to perform the job.  Any equipment will be operated by the owner.  No irrigation, french drains or subsurface water collections will be installed.</text_data><comment_date>2013-06-12T00:00:00</comment_date></row><row _id="row-nsrj-k7pj-gidb" _uuid="00000000-0000-0000-A9E3-738885870004" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nsrj-k7pj-gidb"><intent_id>663554</intent_id><project_id>747956</project_id><text_data>Both address are locate in the city of Tacoma1. Nancy Roesch   1813 South L. Street2. Sam Patu   1808 South L. Street</text_data><comment_date>2014-10-31T00:00:00</comment_date></row><row _id="row-sksv-72rd_da9h" _uuid="00000000-0000-0000-6D12-C6DD9B5EFB58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sksv-72rd_da9h"><intent_id>850449</intent_id><project_id>824961</project_id><text_data>0217029</text_data><comment_date>2017-07-26T00:00:00</comment_date></row><row _id="row-bgi5_yr3k.5ap2" _uuid="00000000-0000-0000-8E4B-36735BC1F4F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bgi5_yr3k.5ap2"><intent_id>719620</intent_id><project_id>703096</project_id><text_data># of employees vary by need</text_data><comment_date>2015-09-09T00:00:00</comment_date></row><row _id="row-9554~7rdg-czq6" _uuid="00000000-0000-0000-16C7-1A9E4CD36416" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9554~7rdg-czq6"><intent_id>837285</intent_id><project_id>823059</project_id><text_data>Telecom Tech(09)Inside buildingInstall telephone and data cabling to cubicles</text_data><comment_date>2017-05-31T00:00:00</comment_date></row><row _id="row-dp2u_qhd2_e53x" _uuid="00000000-0000-0000-BF22-861D3399409E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dp2u_qhd2_e53x"><intent_id>949272</intent_id><project_id>868018</project_id><text_data>File Per MJW</text_data><comment_date>2018-12-05T00:00:00</comment_date></row><row _id="row-6wdr.ejmc.whhv" _uuid="00000000-0000-0000-CC98-032450F742A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6wdr.ejmc.whhv"><intent_id>974291</intent_id><project_id>846148</project_id><text_data>Installation permanent fencing</text_data><comment_date>2019-04-26T00:00:00</comment_date></row><row _id="row-vhgm_rkfg.u8tg" _uuid="00000000-0000-0000-FDD5-FD5D4CFFD3E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vhgm_rkfg.u8tg"><intent_id>922959</intent_id><project_id>804733</project_id><text_data>Job # 886120</text_data><comment_date>2018-08-02T00:00:00</comment_date></row><row _id="row-zzjw-uq72-gnx7" _uuid="00000000-0000-0000-9E23-8FCB77E6EA8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zzjw-uq72-gnx7"><intent_id>543482</intent_id><project_id>699294</project_id><text_data>Installation of bark in park beds for beautification thru a 4&amp;quot; hose out of a blower truck.</text_data><comment_date>2012-11-07T00:00:00</comment_date></row><row _id="row-bdzz~xnwa-mjha" _uuid="00000000-0000-0000-E727-2730F5A6C345" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bdzz~xnwa-mjha"><intent_id>1290205</intent_id><project_id>1018984</project_id><text_data>Kent Youth and Family ServicesInvoice 35584873</text_data><comment_date>2022-12-15T00:00:00</comment_date></row><row _id="row-urnc.udvd_6fay" _uuid="00000000-0000-0000-F9CA-99EC02B9DDE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-urnc.udvd_6fay"><intent_id>1217549</intent_id><project_id>1003424</project_id><text_data>2022 Inside FM Electrician - Wage $59.24; District 9 $5.29; Edison Pension $9.35; NEBF $1.78; Health &amp; Welfare $10.00; Flex $1.30; Apprenticeship $.80; BLMCC $.20 (total fringe $28.72) Total 87.96</text_data><comment_date>2022-03-14T00:00:00</comment_date></row><row _id="row-8kv6~vbaa.exg5" _uuid="00000000-0000-0000-5DC1-DB7B320B295C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8kv6~vbaa.exg5"><intent_id>660953</intent_id><project_id>735146</project_id><text_data>Owner of company will be the licensed driller.</text_data><comment_date>2014-10-17T00:00:00</comment_date></row><row _id="row-bqjk-bvsh.5nqq" _uuid="00000000-0000-0000-A213-02E6556AD4E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bqjk-bvsh.5nqq"><intent_id>657546</intent_id><project_id>741146</project_id><text_data>Installation of irrigation system. Dig trenches with hand tools. Shovels, wheelbarrows and rakes</text_data><comment_date>2014-09-29T00:00:00</comment_date></row><row _id="row-8576-zmd2.kb4d" _uuid="00000000-0000-0000-CD3A-EB3316AA7C7E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8576-zmd2.kb4d"><intent_id>833076</intent_id><project_id>784544</project_id><text_data>Fringe Benefits are as follows...NEBF		1.57Medical		8.75Pension		7.88401K		2.00JATC		.68AMF		.39LMCC		.10NLMCC		.01SAP		.10</text_data><comment_date>2017-06-08T00:00:00</comment_date></row><row _id="row-u535~e6mg.xcak" _uuid="00000000-0000-0000-720A-92B77AF55211" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u535~e6mg.xcak"><intent_id>950797</intent_id><project_id>868692</project_id><text_data>1000278 Electrical-LV Data</text_data><comment_date>2018-12-14T00:00:00</comment_date></row><row _id="row-7p8w_sdgs_d96s" _uuid="00000000-0000-0000-059E-332603CC9C88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7p8w_sdgs_d96s"><intent_id>590841</intent_id><project_id>716947</project_id><text_data>063031</text_data><comment_date>2013-08-29T00:00:00</comment_date></row><row _id="row-6v2u.q68w_un5a" _uuid="00000000-0000-0000-80F5-06DD2CFBD08A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6v2u.q68w_un5a"><intent_id>1030563</intent_id><project_id>867532</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2020-01-08T00:00:00</comment_date></row><row _id="row-evyt.3qu9~susf" _uuid="00000000-0000-0000-E650-4EEF1982C207" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-evyt.3qu9~susf"><intent_id>1084591</intent_id><project_id>931027</project_id><text_data>2002-2584</text_data><comment_date>2020-08-31T00:00:00</comment_date></row><row _id="row-z5a5~gs74-7z85" _uuid="00000000-0000-0000-F2A8-273EFDE84FEE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z5a5~gs74-7z85"><intent_id>1316978</intent_id><project_id>1051246</project_id><text_data>Other Truck - Equipment Haul using a Kenworth 6x4 Bogie Axle 56,000 GVW Diesel.</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-uekv_gdsi-g57k" _uuid="00000000-0000-0000-B2AC-50282B3F0832" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uekv_gdsi-g57k"><intent_id>1143426</intent_id><project_id>961730</project_id><comment_date>2021-05-10T00:00:00</comment_date></row><row _id="row-nkvk-8vdd-edc8" _uuid="00000000-0000-0000-A066-C26DD345AA9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nkvk-8vdd-edc8"><intent_id>929493</intent_id><project_id>803227</project_id><text_data>Eaton UPS equipment startups and commissioning. 1 year UPS warranty from date of startup.</text_data><comment_date>2018-08-29T00:00:00</comment_date></row><row _id="row-dgsu~7sew.swru" _uuid="00000000-0000-0000-4C5E-C618C5BC8E6A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgsu~7sew.swru"><intent_id>759401</intent_id><project_id>790807</project_id><text_data>Installation of indoor copper telephone telecommunications cabling</text_data><comment_date>2016-04-29T00:00:00</comment_date></row><row _id="row-ms9r~wi59.pzv6" _uuid="00000000-0000-0000-1A42-3ECF57C87E4E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ms9r~wi59.pzv6"><intent_id>913868</intent_id><project_id>842529</project_id><text_data>Labor and materials for the installation of low voltage cabling for the purpose of networking personal computers in portable classrooms.</text_data><comment_date>2018-06-26T00:00:00</comment_date></row><row _id="row-9tcm~9w6j.8cqk" _uuid="00000000-0000-0000-3E1D-742CA51D2628" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9tcm~9w6j.8cqk"><intent_id>901825</intent_id><project_id>824402</project_id><text_data>PN # 43185 SEA</text_data><comment_date>2018-05-01T00:00:00</comment_date></row><row _id="row-5mx5_jics.2ktz" _uuid="00000000-0000-0000-19CA-4B7D12781C8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5mx5_jics.2ktz"><intent_id>588669</intent_id><project_id>715815</project_id><text_data>6.13 goes to MBA Health Trust for health insurance the balance of 9.77 Goes to Davis Bacon Pension Trust6.13 Goes to MBA Health Trust for health insurance the balance of 10.10 goes to Davis Bacon Pension Trust</text_data><comment_date>2013-09-04T00:00:00</comment_date></row><row _id="row-x8qy~nukx~akjb" _uuid="00000000-0000-0000-5999-F9BA1EDDD8D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x8qy~nukx~akjb"><intent_id>674862</intent_id><project_id>753720</project_id><text_data>Remove 343 sq. ft. of asbestos vinyl (Installed directly of sub-floor). Remove 34 sq. ft. of asbestos vinyl (Installed directly of concrete)Permits, notifications, asbestos bags and disposal fee included in price</text_data><comment_date>2015-01-15T00:00:00</comment_date></row><row _id="row-cuvg-kqi7-dnym" _uuid="00000000-0000-0000-83ED-DAD1B562D19F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cuvg-kqi7-dnym"><intent_id>930074</intent_id><project_id>860374</project_id><text_data>Install Access Control Doors on new portable classroom</text_data><comment_date>2018-08-31T00:00:00</comment_date></row><row _id="row-qthw-x8ft~5kzp" _uuid="00000000-0000-0000-8E1D-E4992244850E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qthw-x8ft~5kzp"><intent_id>904569</intent_id><project_id>845296</project_id><text_data>Will be providing traffic control flagger</text_data><comment_date>2018-05-23T00:00:00</comment_date></row><row _id="row-b4h4.mw92_bzu7" _uuid="00000000-0000-0000-E8CD-F2D50070C3DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b4h4.mw92_bzu7"><intent_id>1145602</intent_id><project_id>962883</project_id><text_data>WRS Job # M21-552PW6</text_data><comment_date>2021-05-18T00:00:00</comment_date></row><row _id="row-pept_eug6_d5ki" _uuid="00000000-0000-0000-78DE-276749EAABB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pept_eug6_d5ki"><intent_id>1018655</intent_id><project_id>898200</project_id><text_data>#20630, Kellberg,Joyce, 5323 N Adams, Spokane</text_data><comment_date>2019-11-20T00:00:00</comment_date></row><row _id="row-rd7n-s678.hvgm" _uuid="00000000-0000-0000-D4DE-F06E5A085CC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rd7n-s678.hvgm"><intent_id>969562</intent_id><project_id>855245</project_id><text_data>0219009</text_data><comment_date>2019-04-04T00:00:00</comment_date></row><row _id="row-f5du.7c7z_2zkc" _uuid="00000000-0000-0000-B012-9CABDF57C95D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f5du.7c7z_2zkc"><intent_id>1028456</intent_id><project_id>902830</project_id><text_data>#1 � The crew will be inspecting and servicing the heat pump and electric furnace#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2019-12-23T00:00:00</comment_date></row><row _id="row-piaj.ycy6-k7kc" _uuid="00000000-0000-0000-B4D2-C6E511C8C3E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-piaj.ycy6-k7kc"><intent_id>1182688</intent_id><project_id>955150</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2021-10-04T00:00:00</comment_date></row><row _id="row-8cbu-pmqm_cwap" _uuid="00000000-0000-0000-55F7-44177D34F151" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8cbu-pmqm_cwap"><intent_id>1418308</intent_id><project_id>1119632</project_id><text_data>inv # 301807 3/15/24</text_data><comment_date>2024-04-11T00:00:00</comment_date></row><row _id="row-emuv~mei4_pb7x" _uuid="00000000-0000-0000-140F-F6054D42A9CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-emuv~mei4_pb7x"><intent_id>907869</intent_id><project_id>852064</project_id><text_data>THIS IS A LOW INCOME WEATHERIZATION PROJECT. IT IS A SINGLE FAMILY RESIDENTIAL DWELLING.</text_data><comment_date>2018-05-30T00:00:00</comment_date></row><row _id="row-7fru~nmgg_hjtc" _uuid="00000000-0000-0000-B847-E1FC26E3C401" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7fru~nmgg_hjtc"><intent_id>1260105</intent_id><project_id>1027578</project_id><text_data>9898704</text_data><comment_date>2022-08-22T00:00:00</comment_date></row><row _id="row-gmaj~ucww-kbu9" _uuid="00000000-0000-0000-22EE-A4F40F0EE7DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gmaj~ucww-kbu9"><intent_id>1181809</intent_id><project_id>981340</project_id><text_data>KG2587</text_data><comment_date>2021-09-29T00:00:00</comment_date></row><row _id="row-n3i7_5ing~qy97" _uuid="00000000-0000-0000-FC03-137D5BBE8081" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n3i7_5ing~qy97"><intent_id>868842</intent_id><project_id>826002</project_id><text_data>RON RHOADS IS AN OWNER OPERATOR</text_data><comment_date>2017-10-13T00:00:00</comment_date></row><row _id="row-676a.yxyk_w5xv" _uuid="00000000-0000-0000-73AA-765193539A98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-676a.yxyk_w5xv"><intent_id>1252145</intent_id><project_id>970997</project_id><text_data>Place wood chips along road for beautification</text_data><comment_date>2022-07-26T00:00:00</comment_date></row><row _id="row-hvnk-bdmb~9u8q" _uuid="00000000-0000-0000-2209-04F98F54F5EF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hvnk-bdmb~9u8q"><intent_id>954796</intent_id><project_id>870590</project_id><text_data>Pour concrete slab using 37hp miniexcavator and concrete hand tools.</text_data><comment_date>2019-01-13T00:00:00</comment_date></row><row _id="row-2s6h-yyzd.bcqb" _uuid="00000000-0000-0000-B5E0-2BE04C65F6E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2s6h-yyzd.bcqb"><intent_id>1152412</intent_id><project_id>966585</project_id><text_data>Invoice #140231435</text_data><comment_date>2021-06-14T00:00:00</comment_date></row><row _id="row-tsrj-z9ig.bk8s" _uuid="00000000-0000-0000-BE52-DBB893B920C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsrj-z9ig.bk8s"><intent_id>887268</intent_id><project_id>842765</project_id><text_data>PROJECT IS EXEMPT FROM STATE PREVAILING WAGE REQUIREMENTS BASED ON THE HOUSING ACT OF 1937 AND 24 CFR 965,101. WORKERS WILL BE PAID IN THE ACCORDANCE WITH DAVIS-BACON WAGE REQUIREMENTS FOR THE FOLLOWING CRAFTS/TRADES/OCCUPATIONS: SOFT FLOOR LAYER</text_data><comment_date>2018-02-08T00:00:00</comment_date></row><row _id="row-jtid.5xu5.4cux" _uuid="00000000-0000-0000-117E-15BB193120C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jtid.5xu5.4cux"><intent_id>927876</intent_id><project_id>859554</project_id><text_data>Workers Comp through Idaho State Insurance Fund Policy 568189</text_data><comment_date>2018-08-23T00:00:00</comment_date></row><row _id="row-ke6u.hdc7~g33j" _uuid="00000000-0000-0000-5D84-D42715F98933" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ke6u.hdc7~g33j"><intent_id>530224</intent_id><project_id>694439</project_id><text_data>Filed by David Baker</text_data><comment_date>2012-08-23T00:00:00</comment_date></row><row _id="row-sa3x_rg5d_urfr" _uuid="00000000-0000-0000-744D-423BD6662744" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sa3x_rg5d_urfr"><intent_id>1064629</intent_id><project_id>922104</project_id><text_data>WRI Job # 20.025</text_data><comment_date>2020-06-11T00:00:00</comment_date></row><row _id="row-xfzg.yuss_ug9d" _uuid="00000000-0000-0000-BA39-DA25835844FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xfzg.yuss_ug9d"><intent_id>849526</intent_id><project_id>827950</project_id><text_data>Job #111156-001</text_data><comment_date>2017-07-24T00:00:00</comment_date></row><row _id="row-rzg2~f2pp_jmis" _uuid="00000000-0000-0000-4B76-121FF3F80D61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzg2~f2pp_jmis"><intent_id>642230</intent_id><project_id>739367</project_id><text_data>Form filed by: Jeff Blesener</text_data><comment_date>2014-07-21T00:00:00</comment_date></row><row _id="row-mbkv.sk9w.j7qf" _uuid="00000000-0000-0000-6E34-D2202CFA191B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbkv.sk9w.j7qf"><intent_id>1224752</intent_id><project_id>1003779</project_id><text_data>sweeping using a truck mounted sweeper.</text_data><comment_date>2022-04-11T00:00:00</comment_date></row><row _id="row-4ufy.qzir-3z64" _uuid="00000000-0000-0000-E465-DAF257AAE8F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ufy.qzir-3z64"><intent_id>481057</intent_id><project_id>675413</project_id><text_data>Power Equipment Operator Motor Patrol Grader Finishing is occupation for our vacuum truck operator.  Nozzleman is the helper.</text_data><comment_date>2011-09-29T00:00:00</comment_date></row><row _id="row-gvwq-7hcp_qn2p" _uuid="00000000-0000-0000-DC3C-F55ACD8C8C91" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gvwq-7hcp_qn2p"><intent_id>845322</intent_id><project_id>819873</project_id><text_data>Job #112284-001 Related to Job #201924-002</text_data><comment_date>2017-07-06T00:00:00</comment_date></row><row _id="row-p29v-mjgi-m3tp" _uuid="00000000-0000-0000-8718-0EEB564E664C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p29v-mjgi-m3tp"><intent_id>789897</intent_id><project_id>802674</project_id><text_data>The whole project is as follows: Perform an  upgrade of the DDC Controls System Software.Plumbers and Pipefitters did not work on this job.  Sheet Metal Worker installed the software.  No tools or vehicles were used.  The only equipment was the software that got installed.</text_data><comment_date>2016-10-27T00:00:00</comment_date></row><row _id="row-d2nf-5xtq-p6jq" _uuid="00000000-0000-0000-4DC1-C5D20D3A6870" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d2nf-5xtq-p6jq"><intent_id>786305</intent_id><project_id>788279</project_id><text_data># 1 - Drywall, # 2 - Apartments, #3 - 4 stories, #4 - low income housing (c) yes, #5 - Yes, #6 - Yes, #7 - Yes, #8 - No</text_data><comment_date>2016-08-31T00:00:00</comment_date></row><row _id="row-t8e4~ep66.egaj" _uuid="00000000-0000-0000-84FD-299178B8A245" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t8e4~ep66.egaj"><intent_id>1146663</intent_id><project_id>963446</project_id><text_data>The entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative.</text_data><comment_date>2021-05-21T00:00:00</comment_date></row><row _id="row-zc35_dm27_5n8n" _uuid="00000000-0000-0000-AA93-C3746C2A3B2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zc35_dm27_5n8n"><intent_id>1418527</intent_id><project_id>1119763</project_id><text_data>GSS Service ticket #156668</text_data><comment_date>2024-04-11T00:00:00</comment_date></row><row _id="row-tj3q-hzwm-jwty" _uuid="00000000-0000-0000-308B-A4A66A49F147" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tj3q-hzwm-jwty"><intent_id>481190</intent_id><project_id>673901</project_id><text_data>Other Trucks:  1) 4,000 gallon Water Truck  GVW 46,000  2) On-Highway Truck Tractor pulling Ranco ED26-34 On-Highway Rear Dump Semi-Trailer  GVW 90,000</text_data><comment_date>2011-10-19T00:00:00</comment_date></row><row _id="row-j72a~kswr-tj6f" _uuid="00000000-0000-0000-89BE-CE0DCA85316E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j72a~kswr-tj6f"><intent_id>1178979</intent_id><project_id>980052</project_id><text_data>A) Cougar Mountain Middle School, project involving removal of trees from an adjacent property.B)Tree RemovalFailed Douglas fir (Tree Solutions #372) -Remove to low stump -Leave wood on site in maximum of 5' lengths -Cleanup and haul away all other brush and debrisTree RemovalFailed Douglas fir (Tree Solutions #367) -Remove to low stump -Leave wood on site in maximum of 5' lengths -Cleanup and haul away all other brush and debrisTree PruningWestern Redcedar (Tree Solutions #366) Pruning Objective: -Improve safety Pruning Treatment: -Remove dead tops, lower to a selective heading cut at the live crown. -Perform a coronet (jagged) cut to replicate a natural fracture and improve habitat value -Leave wood on site in maximum of 5' lengths -Cleanup and haul away all other brush and debrisTree PruningWestern Redcedar (near #336) Pruning Objective: -Improve safety Pruning Treatment: -Remove dead top Pruning Dose: -No more than 5% of the total live foliage to be removed -Cleanup and haul away all wood and debris</text_data><comment_date>2021-09-23T00:00:00</comment_date></row><row _id="row-xa59-bmxe_ifg6" _uuid="00000000-0000-0000-DDB2-19EB5F14A7C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xa59-bmxe_ifg6"><intent_id>780430</intent_id><project_id>798044</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK &amp;quot;POWER EQUIPMENT OPERATOR - MOTOR PATROL GRADER (FINISHER)&amp;quot; USED FOR VACTOR GUZZLER/VACCON SUPER SUCKER; VACCON TRUCK DRIVER/OPERATOR NOT A MOTOR PATROL GRADER</text_data><comment_date>2016-08-08T00:00:00</comment_date></row><row _id="row-g7ph_43km~xcd7" _uuid="00000000-0000-0000-A797-EF88B29CC093" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g7ph_43km~xcd7"><intent_id>1048554</intent_id><project_id>907353</project_id><text_data>PPC #19584</text_data><comment_date>2020-03-30T00:00:00</comment_date></row><row _id="row-w7gg_7t8v~zepa" _uuid="00000000-0000-0000-A541-659F004D126D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w7gg_7t8v~zepa"><intent_id>948040</intent_id><project_id>867492</project_id><text_data>PROVIDE AND INSTALL 2 CAT6 CABLES FOR VOICE AND DATA. ALL WORK PERFORMED INSIDE</text_data><comment_date>2018-11-28T00:00:00</comment_date></row><row _id="row-q8gf-c8qv~5bfr" _uuid="00000000-0000-0000-756B-33115FDB3E05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8gf-c8qv~5bfr"><intent_id>1263977</intent_id><project_id>1029586</project_id><text_data>12742 SA 2022 - 9898858</text_data><comment_date>2022-09-04T00:00:00</comment_date></row><row _id="row-xs4c-7469-hfk8" _uuid="00000000-0000-0000-74E7-A4BE040B2810" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xs4c-7469-hfk8"><intent_id>874757</intent_id><project_id>835889</project_id><text_data>HIRED BY JEM CONTRACTORS</text_data><comment_date>2017-11-14T00:00:00</comment_date></row><row _id="row-5hd3-mzeh.8ydr" _uuid="00000000-0000-0000-EDFD-40CD34871206" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5hd3-mzeh.8ydr"><intent_id>1257662</intent_id><project_id>1018986</project_id><text_data>Other Trucks - Broom Sweeper Truck</text_data><comment_date>2022-08-12T00:00:00</comment_date></row><row _id="row-enfx_cvg6~ku53" _uuid="00000000-0000-0000-59E1-DEFF3AC0BE10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-enfx_cvg6~ku53"><intent_id>628242</intent_id><project_id>727161</project_id><text_data>Nat Pen		$1.52NW Pen	$5.07NW 401K	$.68Ind Fund	$.37ITI/NEMI	$.17LOC Trn		$.66Org Trust	$1.47Snap		$.03</text_data><comment_date>2014-05-06T00:00:00</comment_date></row><row _id="row-evh6-87bs_j9wj" _uuid="00000000-0000-0000-91EF-E5F284456792" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-evh6-87bs_j9wj"><intent_id>1200415</intent_id><project_id>992461</project_id><text_data>Labor and materials for installation of fiber optic cable inside a school building for the purpose of networking personal computers.</text_data><comment_date>2021-12-20T00:00:00</comment_date></row><row _id="row-iukj_e9v8~w4jh" _uuid="00000000-0000-0000-A38D-073694D2BC7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iukj_e9v8~w4jh"><intent_id>757961</intent_id><project_id>760312</project_id><text_data>1.[Siding labor],  2.[4plex],  3.[no]  4.[residential dwelling]  a-no,  b-no,  c-yes,  d-no,  e-no,  f-no,  g-no,  h-no,  I-no,  j-no,  k-no,  5.[yes] 6[yes,  7[no]  8[no]</text_data><comment_date>2016-04-21T00:00:00</comment_date></row><row _id="row-45e7.b4d7_cjzs" _uuid="00000000-0000-0000-B9A3-E33B1D294FD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-45e7.b4d7_cjzs"><intent_id>691611</intent_id><project_id>760740</project_id><text_data>Installation only of standard data grade communications wiring indoor CMR or CMP rated for use with non-IP phone/key system for voice and non PoE grade data switches (10/100/1000) for transmission of dataProvide and install fifty four (54) Cat6 data cables - performed indoors.</text_data><comment_date>2015-04-29T00:00:00</comment_date></row><row _id="row-bsxb.mzvq_f8hi" _uuid="00000000-0000-0000-0C60-3CE9B9AF8D2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bsxb.mzvq_f8hi"><intent_id>1208723</intent_id><project_id>997840</project_id><comment_date>2022-02-02T00:00:00</comment_date></row><row _id="row-vrsv.s4up~r49m" _uuid="00000000-0000-0000-09E4-B33D6C7967C8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vrsv.s4up~r49m"><intent_id>822333</intent_id><project_id>816328</project_id><text_data>We carry our own insurance as a tribal entity.  You should the information on file.</text_data><comment_date>2017-03-23T00:00:00</comment_date></row><row _id="row-dedc_imng.rrtu" _uuid="00000000-0000-0000-6A40-DD2E9836078B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dedc_imng.rrtu"><intent_id>922740</intent_id><project_id>857630</project_id><text_data>Job #201785-003</text_data><comment_date>2018-08-02T00:00:00</comment_date></row><row _id="row-tekc_jfn8.nbpe" _uuid="00000000-0000-0000-4113-640BA128788B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tekc_jfn8.nbpe"><intent_id>688789</intent_id><project_id>759843</project_id><text_data>Install a ductless heat pump. Single FamilyTwo storya nob noc Yesd noe nof no g noh noi noj nok no5 yes6 yes7 no8 no</text_data><comment_date>2015-04-13T00:00:00</comment_date></row><row _id="row-h5ua~3qx3~4858" _uuid="00000000-0000-0000-089B-9A636D9B8812" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h5ua~3qx3~4858"><intent_id>764938</intent_id><project_id>791833</project_id><text_data>Union Contractor7.02 Medical Insurance15.50 Pensions.97 Apprentice training programs</text_data><comment_date>2016-05-27T00:00:00</comment_date></row><row _id="row-cmyk.q4a4.7tbt" _uuid="00000000-0000-0000-20B2-E04C2F58D836" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cmyk.q4a4.7tbt"><intent_id>927332</intent_id><project_id>859353</project_id><text_data>PC6 - Job #901-19CB</text_data><comment_date>2018-08-21T00:00:00</comment_date></row><row _id="row-mrpm~3jbi-br4a" _uuid="00000000-0000-0000-899F-B90F4305502C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrpm~3jbi-br4a"><intent_id>1069370</intent_id><project_id>923549</project_id><text_data>We do not know the entire scope of this project as we are only performing the erosion control portion. Our laborers use hand tools like picks, shovels, and post pounders to install temporary erosion and sediment control products.</text_data><comment_date>2020-07-01T00:00:00</comment_date></row><row _id="row-e446.58xu-pfb9" _uuid="00000000-0000-0000-4F3B-DDEE9027AC49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e446.58xu-pfb9"><intent_id>567559</intent_id><project_id>710137</project_id><text_data>Form filed by: Don Ritchie</text_data><comment_date>2013-05-02T00:00:00</comment_date></row><row _id="row-4yzn.p36h-udz4" _uuid="00000000-0000-0000-46B5-887C9FA548ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4yzn.p36h-udz4"><intent_id>476288</intent_id><project_id>673791</project_id><text_data>This is a SERC cold roof Project.</text_data><comment_date>2011-09-06T00:00:00</comment_date></row><row _id="row-quzr~df4k_2zej" _uuid="00000000-0000-0000-C273-4E6C00321C9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-quzr~df4k_2zej"><intent_id>680124</intent_id><project_id>756103</project_id><text_data>Intent for 2015 On Call Plumbing Services/Affidavits filed for each call</text_data><comment_date>2015-02-20T00:00:00</comment_date></row><row _id="row-pzg2_igcm~zcch" _uuid="00000000-0000-0000-BC1F-B6D81BF15575" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pzg2_igcm~zcch"><intent_id>879259</intent_id><project_id>838285</project_id><text_data>Ernesto Gomez103 W. Mead Ave.Yakima, WA 98902</text_data><comment_date>2017-12-14T00:00:00</comment_date></row><row _id="row-bnss-c9vc.rq2n" _uuid="00000000-0000-0000-86D1-78066F0A78E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bnss-c9vc.rq2n"><intent_id>824255</intent_id><project_id>817162</project_id><text_data>Krystal Kneer is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing new fans, new kitchen range, new co detector and new ductless heat pump. This job meets the residential job requirements.</text_data><comment_date>2017-04-03T00:00:00</comment_date></row><row _id="row-8jvq.y9pq_mrbx" _uuid="00000000-0000-0000-DD3C-41F4E8451BB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8jvq.y9pq_mrbx"><intent_id>654841</intent_id><project_id>736465</project_id><text_data>JCI Project # 4088-0228</text_data><comment_date>2014-09-16T00:00:00</comment_date></row><row _id="row-su7w.9aqy_2tkb" _uuid="00000000-0000-0000-0677-43A580D9E5E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-su7w.9aqy_2tkb"><intent_id>524071</intent_id><project_id>692213</project_id><text_data>The structure is a single family,single story double-wide trailer,with no basement or garage. The home is used as the permanent residence for a family of the (village). The Home has its own kitchen and bathroom. There is no Managers on site and is not used by members of the public</text_data><comment_date>2012-07-25T00:00:00</comment_date></row><row _id="row-gjpx_3tie~hgdt" _uuid="00000000-0000-0000-15AC-483C7858550D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gjpx_3tie~hgdt"><intent_id>1015729</intent_id><project_id>888588</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2019-10-16T00:00:00</comment_date></row><row _id="row-pjfc~z2bu_6yaq" _uuid="00000000-0000-0000-BE7D-D43CC1B0A2E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pjfc~z2bu_6yaq"><intent_id>599768</intent_id><project_id>722139</project_id><text_data>Excerpt from letter sent with Intent form 10/25/2013:Subject: Prevailing Wage FormReference:Dear Sir or Madam,Please find the updated Prevailing Wage form. Xorail will have not hourly employees working on this project in the state of Washington. Our subcontractor &amp;quot;Midvale&amp;quot;, who will be performing our construction work and installation of our equipment, does have hourly employees. They are and have been registered in the state of Washington and has completed the Prevailing wage form for their organization. Should you ahve any questions, or require any additional information please do not hesitate to contact me at (303) 454-6086. Sincerely,William J. Tibbetts, PMP</text_data><comment_date>2013-11-18T00:00:00</comment_date></row><row _id="row-jdq9-n4q3_fazp" _uuid="00000000-0000-0000-8D3F-32F50AB1D34C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jdq9-n4q3_fazp"><intent_id>624982</intent_id><project_id>720337</project_id><text_data>STANDARD UNION BENEFIT PACKAGE, GLAZIERS &amp; GLASSWORKERS UNION LOCAL #188DRUG TESTING/WCISAP $0.06, PENSION $8.35, HEALTH &amp; WELFARE $6.00, APPRENTICE $0.55, LMCI $0.05(EFFECTIVE JULY 1, 2013 THRU JUNE 30, 2014)</text_data><comment_date>2014-04-15T00:00:00</comment_date></row><row _id="row-yspp-3vid~wfr2" _uuid="00000000-0000-0000-B1EB-DC94954B3265" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yspp-3vid~wfr2"><intent_id>1099725</intent_id><project_id>937649</project_id><text_data>Truck Driver: delivery of materials to job site in company box truck.</text_data><comment_date>2020-11-06T00:00:00</comment_date></row><row _id="row-vi3f~36mf~mzu6" _uuid="00000000-0000-0000-E124-983A206FB869" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vi3f~36mf~mzu6"><intent_id>1100728</intent_id><project_id>938599</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a - no; 4b - no; 4c - yes; 4d - no; 4e - no; 4f - no; 4g - no; 4h - no; 4i - no; 4j - no; 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2020-11-03T00:00:00</comment_date></row><row _id="row-bnas_ehdb.ibhn" _uuid="00000000-0000-0000-C8C1-FF5CE442CA86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bnas_ehdb.ibhn"><intent_id>1033833</intent_id><project_id>905773</project_id><text_data>1.  Modify existing  plumbing to help resolve backups2. Single Family3.24. a- no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no5. yes6. yes7. no8. no</text_data><comment_date>2020-01-24T00:00:00</comment_date></row><row _id="row-ba4n.x4cv_w3u2" _uuid="00000000-0000-0000-108E-D03B2C2D712E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ba4n.x4cv_w3u2"><intent_id>710746</intent_id><project_id>766929</project_id><text_data>095088</text_data><comment_date>2015-07-29T00:00:00</comment_date></row><row _id="row-64ft_3qqx.im83" _uuid="00000000-0000-0000-4037-7240FB2EE5A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-64ft_3qqx.im83"><intent_id>950544</intent_id><project_id>839971</project_id><text_data>Filed by Donna Buchanan</text_data><comment_date>2018-12-12T00:00:00</comment_date></row><row _id="row-5jra_b4j2.asev" _uuid="00000000-0000-0000-A0B5-4581C3587475" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5jra_b4j2.asev"><intent_id>744953</intent_id><project_id>784292</project_id><text_data>Filed by J. Gregory Shaffer</text_data><comment_date>2016-02-04T00:00:00</comment_date></row><row _id="row-8e3r_j4ct~xrag" _uuid="00000000-0000-0000-C1EB-4A76D7556840" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8e3r_j4ct~xrag"><intent_id>1113531</intent_id><project_id>945614</project_id><text_data>Turf:Mowing � using regular push mowersTrimming � using a hand held 2 hp weed wackerEdging � using a hand held 2 hp edgerFertilizing � using a walk behind fertilizer spreaderHerbicide application � using back pack sprayer 4 gallonTREES, SHRUBS AND GROUND COVER BEDSWeeding � using hula hoes, a rake to pile up and hand stuffed into a garbage bag.Trimming Ground Cover � trimming/pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage can.Pruning Shrubs - trimming / pruning of shrubs and plants/trees under 10 feet using hand shears or hand held loppers. Debris is placed into a 30 gallon garbage canPre-emergent Herbicide � hand held spreaderHARD SURFACESSweeping � using back pack air blowersWeeds � using back pack sprayer 4 gallonOTHERLeaf Removal � Raked into piles and placed into 30 gallon garbage cans.Litter � Picked up by hand and placed into garbage bags.ANNUAL FLOWER BEDSChange Annual Color � remove existing annual color with shovels, replace with new annual color and cover new material using shovel and rake bed using hand held rakes.Fertilizer � applied using a hand held spreaderGroom Annuals � no tools, hand groomingWeeding - no tools, hand weedingHerbicide � applied using back pack sprayersIRRIGATIONSystem Start-up � small shovel to remove dirt from system.Operate System � no toolsWinterize System � air compressor is used to blow system.</text_data><comment_date>2021-01-06T00:00:00</comment_date></row><row _id="row-hwmx.svzu.hq9t" _uuid="00000000-0000-0000-835A-13B8DFC3F2B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hwmx.svzu.hq9t"><intent_id>913046</intent_id><project_id>854079</project_id><text_data>Filed by Jill C Guess</text_data><comment_date>2018-06-21T00:00:00</comment_date></row><row _id="row-gvmn.m2wy.ar4v" _uuid="00000000-0000-0000-F415-84B874332BAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gvmn.m2wy.ar4v"><intent_id>1288340</intent_id><project_id>1043766</project_id><text_data>SR53125298</text_data><comment_date>2022-12-07T00:00:00</comment_date></row><row _id="row-6ebr-gi38_c4i6" _uuid="00000000-0000-0000-98C5-998A3B9B08B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ebr-gi38_c4i6"><intent_id>1154604</intent_id><project_id>965525</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a - no; 4b - no; 4c - yes; 4d - no; 4e - no; 4f - no; 4g - no; 4h - no; 4i - no; 4j - no; 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2021-06-22T00:00:00</comment_date></row><row _id="row-dwfh~t3cm.d5t2" _uuid="00000000-0000-0000-22BF-17F393D36E32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dwfh~t3cm.d5t2"><intent_id>739743</intent_id><project_id>777476</project_id><text_data>TW CLARK CONSTRUCTION LLC 601858364 TO DIAMOND ELECTRIC LLC 603020839  TO SIMPLEXGRINNELL 602113334</text_data><comment_date>2015-12-30T00:00:00</comment_date></row><row _id="row-4vfa_myvy_4af8" _uuid="00000000-0000-0000-536A-A67AC6FEA33B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4vfa_myvy_4af8"><intent_id>1230631</intent_id><project_id>1006738</project_id><text_data>301SNM0282 - Intent</text_data><comment_date>2022-05-03T00:00:00</comment_date></row><row _id="row-4tkz_i8xc~xv4a" _uuid="00000000-0000-0000-A29C-EF5F314B1FE6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4tkz_i8xc~xv4a"><intent_id>1269129</intent_id><project_id>1002843</project_id><text_data>Bella Terra will be doing the following work: Up to 30 2 inch caliper trees to be planted with tree stakes, tree ties, fertilizer, compost amended backfill and bark mulch rings.</text_data><comment_date>2022-09-23T00:00:00</comment_date></row><row _id="row-rvse.d93y.pfyv" _uuid="00000000-0000-0000-F00C-4D2BF0D3EE0E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rvse.d93y.pfyv"><intent_id>792683</intent_id><project_id>803724</project_id><text_data>I had to send in another Statement of Intent because after the job was competed I found out that we did have a Laborer working for DGR*Grant Construction, Inc. on this project. This is the third Statement of Intent I&amp;#39;ve filed on this project.</text_data><comment_date>2016-09-29T00:00:00</comment_date></row><row _id="row-94gc~6p8f_byyn" _uuid="00000000-0000-0000-03F2-88DF7F94BC4C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-94gc~6p8f_byyn"><intent_id>709876</intent_id><project_id>739764</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2015-07-24T00:00:00</comment_date></row><row _id="row-nkb4-e5fp_2g9p" _uuid="00000000-0000-0000-95F1-63FAD48C7B1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nkb4-e5fp_2g9p"><intent_id>785574</intent_id><project_id>801024</project_id><text_data>install new in ground irrigation system. Used motorized trencher and hand tools. Installed 6 electric valves, 2 controller timers, up to 900&amp;#39; of 1&amp;quot;poly tube and 30 heads and nozzles. Installation done up to 12&amp;quot; deep where possible.</text_data><comment_date>2016-08-26T00:00:00</comment_date></row><row _id="row-4qwm.4hxh-g4qu" _uuid="00000000-0000-0000-E08C-19543EF59D7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4qwm.4hxh-g4qu"><intent_id>1011285</intent_id><project_id>890957</project_id><text_data>0919552</text_data><comment_date>2019-10-01T00:00:00</comment_date></row><row _id="row-j8c4_rpnp-haau" _uuid="00000000-0000-0000-8B77-45ED77EF5DF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j8c4_rpnp-haau"><intent_id>822099</intent_id><project_id>816217</project_id><text_data>PC-6 PO #1911600049Invoices 3060104 &amp; 3060908CE</text_data><comment_date>2017-03-22T00:00:00</comment_date></row><row _id="row-zsb5_ymh3~izsg" _uuid="00000000-0000-0000-CAFD-3EDB22482FE0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zsb5_ymh3~izsg"><intent_id>1501537</intent_id><project_id>1161456</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a thru 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2025-01-15T00:00:00</comment_date></row><row _id="row-299c.izv6_gpun" _uuid="00000000-0000-0000-6A24-F9EEA0FA4482" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-299c.izv6_gpun"><intent_id>1510013</intent_id><project_id>1170731</project_id><text_data>9963690</text_data><comment_date>2025-02-14T00:00:00</comment_date></row><row _id="row-daqw~y5g8.y6s8" _uuid="00000000-0000-0000-83D8-FDC8F98F68A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-daqw~y5g8.y6s8"><intent_id>1510055</intent_id><project_id>1170777</project_id><text_data>D010736</text_data><comment_date>2025-02-14T00:00:00</comment_date></row><row _id="row-nbmr_etqf~a9hw" _uuid="00000000-0000-0000-4762-73F951CDCF50" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nbmr_etqf~a9hw"><intent_id>1504368</intent_id><project_id>1099579</project_id><text_data>Job 23963</text_data><comment_date>2025-01-24T00:00:00</comment_date></row><row _id="row-kcuu-qduq.pra8" _uuid="00000000-0000-0000-E2B7-A1C2C6E45507" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kcuu-qduq.pra8"><intent_id>1510024</intent_id><project_id>1170742</project_id><text_data>9963821</text_data><comment_date>2025-02-14T00:00:00</comment_date></row><row _id="row-7vyb-6rpa_85dp" _uuid="00000000-0000-0000-0BFE-9FB12AAE9FC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7vyb-6rpa_85dp"><intent_id>831936</intent_id><project_id>820290</project_id><text_data>From: Stuart, Virginia [mailto:Virginia.Stuart@trane.com] Sent: Tuesday, May 23, 2017 1:59 PMTo: LNI RE Prevailing Wage Worker 1 &amp;lt;PW1@LNI.WA.GOV&amp;gt;Cc: Brenda Loupe &amp;lt;Brenda.Loupe@evergreenps.org&amp;gt;Subject: Request: Note Change for Intent #831936Please note on intent #831936 � Intent amount should be for $28,706.49.Thank you!Virginia StuartService Project Administrator TraneOregon�NW-HI DistrictTrane Climate SolutionsIngersoll Rand7257 SW Kable LanePortland, OR 97224 USAPhone: (503) 620-8031Direct: (503) 431-2536E-mail: Virginia.Stuart@trane.comWebsite: www.traneoregon.com</text_data><comment_date>2017-05-24T00:00:00</comment_date></row><row _id="row-neuw-7kmw.9drc" _uuid="00000000-0000-0000-50D4-C808A2238139" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-neuw-7kmw.9drc"><intent_id>1164855</intent_id><project_id>972964</project_id><text_data>Hand weed landscape bed, placing pulled weeds in bucket/trash bags to dispose of in dump.</text_data><comment_date>2021-08-09T00:00:00</comment_date></row><row _id="row-sxw4~8mxb_67cg" _uuid="00000000-0000-0000-106D-5969CD0EB373" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sxw4~8mxb_67cg"><intent_id>684943</intent_id><project_id>755584</project_id><text_data>Shena Bowmark 700 NW Crosby Ave Oak Harbor WA, 98277</text_data><comment_date>2015-03-22T00:00:00</comment_date></row><row _id="row-4bc8-nnbc_spmu" _uuid="00000000-0000-0000-4FEA-9F861958D356" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4bc8-nnbc_spmu"><intent_id>1225056</intent_id><project_id>1008209</project_id><text_data>No work was performed.  We bill for maintenance according to the contract, on a quarterly basis, that doesn't mean our employees will perform labor.  Thank you!</text_data><comment_date>2022-04-12T00:00:00</comment_date></row><row _id="row-8u2e_gw2t-fiuq" _uuid="00000000-0000-0000-44B8-E59FEA052E32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8u2e_gw2t-fiuq"><intent_id>797175</intent_id><project_id>762895</project_id><text_data>This job is use of compressed air and a negative air machines specific to air duct cleaning.</text_data><comment_date>2016-10-22T00:00:00</comment_date></row><row _id="row-w554-xntq_6iza" _uuid="00000000-0000-0000-9FFB-3DA837500076" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w554-xntq_6iza"><intent_id>630408</intent_id><project_id>742264</project_id><text_data>Repaired 1.5&amp;quot; Black Steel Threaded pipe with pipe wrenches.  Saw cut concrete with a motorized concrete saw. Broke concrete with Jack Hammer.   Removed concrete by hand, Dug with shovel down to more Black Steel Pipe.   Cut pipe, repaired with pipe wrenches.  Disposed of old concrete, poured and finished new concrete with trowels.</text_data><comment_date>2014-08-20T00:00:00</comment_date></row><row _id="row-y57d-znyw-m5d2" _uuid="00000000-0000-0000-C959-F0CFF001665B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y57d-znyw-m5d2"><intent_id>761104</intent_id><project_id>787503</project_id><text_data>Total: $16.16: WCISAP: .06, Pension $9.16, Health: $6.24, Appr: .60, LMCI .10</text_data><comment_date>2016-05-10T00:00:00</comment_date></row><row _id="row-cxqi.e73n_jt5m" _uuid="00000000-0000-0000-676D-04AC0E6F7AAF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxqi.e73n_jt5m"><intent_id>581599</intent_id><project_id>715618</project_id><text_data>They picked up flooring debris from the underlayment and sheet vinyl that was installed</text_data><comment_date>2013-08-23T00:00:00</comment_date></row><row _id="row-e3a7~pyt6~gfds" _uuid="00000000-0000-0000-91C2-2EA77FC6098D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e3a7~pyt6~gfds"><intent_id>952997</intent_id><project_id>869756</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.</text_data><comment_date>2019-01-03T00:00:00</comment_date></row><row _id="row-qkuu.398v_gqak" _uuid="00000000-0000-0000-0143-6D0C233DA76E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qkuu.398v_gqak"><intent_id>693716</intent_id><project_id>761916</project_id><text_data>#1:Replace fans and baseboard heaters. #2:Apartment. #3:Two levels. #4:(a)No (b)No (c)Yes (d)No (e)No (f)No (g)No (h)No (i)No (j)No (k)No. #5:Yes #6:Yes #7:Yes #8:No</text_data><comment_date>2015-05-11T00:00:00</comment_date></row><row _id="row-3n2r-48hh~8tes" _uuid="00000000-0000-0000-FF9C-9BC8A5F3F407" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3n2r-48hh~8tes"><intent_id>1170569</intent_id><project_id>947567</project_id><text_data>Truck is an F550 used to transport equipment and materials to and from the job site</text_data><comment_date>2021-08-19T00:00:00</comment_date></row><row _id="row-wyza-5hd4~3m95" _uuid="00000000-0000-0000-6501-843AE5B879FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wyza-5hd4~3m95"><intent_id>1276074</intent_id><project_id>1036125</project_id><text_data>9901126</text_data><comment_date>2022-10-19T00:00:00</comment_date></row><row _id="row-yypy_uedu-7y8b" _uuid="00000000-0000-0000-5585-DBE776C7C035" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yypy_uedu-7y8b"><intent_id>619426</intent_id><project_id>730537</project_id><text_data>Contact Michael Winegar for any questions concerning this project.</text_data><comment_date>2014-03-10T00:00:00</comment_date></row><row _id="row-k5ka.fd5r_9ngi" _uuid="00000000-0000-0000-E64D-8518F5A2237D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k5ka.fd5r_9ngi"><intent_id>1186901</intent_id><project_id>984421</project_id><text_data>sr45465106</text_data><comment_date>2021-10-20T00:00:00</comment_date></row><row _id="row-qbxk.ii7a.pbhq" _uuid="00000000-0000-0000-31DE-6305C5795267" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qbxk.ii7a.pbhq"><intent_id>578125</intent_id><project_id>714382</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR DRIVER - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH OIL/TACK PRIOR TO PLACING ASPHALTOTHER TRUCKS - WATER TANK TRUCK - WILL SPRAY THE ROAD WITH WATER FOR DUST CONTROL</text_data><comment_date>2013-06-27T00:00:00</comment_date></row><row _id="row-pi6r.v7ab~utti" _uuid="00000000-0000-0000-B025-1D854ADE1123" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pi6r.v7ab~utti"><intent_id>846349</intent_id><project_id>826697</project_id><text_data>Single family residence weatherization &amp; insulation upgrade</text_data><comment_date>2017-07-10T00:00:00</comment_date></row><row _id="row-fexz-fe3z-sygh" _uuid="00000000-0000-0000-4438-7182AB297252" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fexz-fe3z-sygh"><intent_id>1030839</intent_id><project_id>904112</project_id><text_data>Install camera to be added to existing Surveillance System.</text_data><comment_date>2020-01-09T00:00:00</comment_date></row><row _id="row-ydkz~ztcx.tje5" _uuid="00000000-0000-0000-9D7C-A73FC6320AB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ydkz~ztcx.tje5"><intent_id>1014779</intent_id><project_id>817013</project_id><text_data>TRUCK DRIVER OTHER- TRUCK MOUNTED PICK UP SWEEPER</text_data><comment_date>2019-10-11T00:00:00</comment_date></row><row _id="row-xc7q-6ikj.nw4e" _uuid="00000000-0000-0000-D17F-D529BEAB8B5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xc7q-6ikj.nw4e"><intent_id>1118292</intent_id><project_id>888401</project_id><text_data>JW: NEBF $1.60, H&amp;W $9.40, Pension $8.63, 401K $2.00, JATC $0.68.</text_data><comment_date>2021-01-27T00:00:00</comment_date></row><row _id="row-zpb2-janm~65e2" _uuid="00000000-0000-0000-21BD-A38A07C2409C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zpb2-janm~65e2"><intent_id>1155456</intent_id><project_id>952195</project_id><text_data>1210056 - SPUD Phase 1 MBR WWTP Improvements</text_data><comment_date>2021-06-24T00:00:00</comment_date></row><row _id="row-pne3~k6hk~q3fp" _uuid="00000000-0000-0000-E662-09D0D990E907" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pne3~k6hk~q3fp"><intent_id>955341</intent_id><project_id>870861</project_id><text_data>The bid due date and contract award date are correct as listed.</text_data><comment_date>2019-01-22T00:00:00</comment_date></row><row _id="row-pahe.wjyu.b7aa" _uuid="00000000-0000-0000-41E3-138AD1A06DB5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pahe.wjyu.b7aa"><intent_id>924734</intent_id><project_id>858388</project_id><text_data>WO #8040283</text_data><comment_date>2018-08-10T00:00:00</comment_date></row><row _id="row-i5cs.4i42_pquj" _uuid="00000000-0000-0000-2F83-004E4EFBAE4E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i5cs.4i42_pquj"><intent_id>694762</intent_id><project_id>762352</project_id><text_data>This is as needed service. Each project will be different. An affidavit of wages paid will be filed with each project completed. will include all of the pertinent information.</text_data><comment_date>2015-06-16T00:00:00</comment_date></row><row _id="row-2kv9.vgv6_e5gu" _uuid="00000000-0000-0000-EA74-C7B74D8C9B57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2kv9.vgv6_e5gu"><intent_id>1140449</intent_id><project_id>960102</project_id><text_data>Job #31480-1</text_data><comment_date>2021-04-28T00:00:00</comment_date></row><row _id="row-yqh7~nbdc_fq8v" _uuid="00000000-0000-0000-F001-DA4FF77DFF56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yqh7~nbdc_fq8v"><intent_id>491214</intent_id><project_id>679076</project_id><text_data>GENERAL LABORERS WILL BE PREPPING SUBGRADE USING SHOVELS AND RAKES &amp; MUDDING CATCH BASINS.THIS PROJECT IS LOCATED NEAR THE SWINOMISH CHEVRON STATION AND SWINOMISH CASINO.</text_data><comment_date>2011-11-30T00:00:00</comment_date></row><row _id="row-u3ns_552h~xsan" _uuid="00000000-0000-0000-A31F-AC9EB6C473BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u3ns_552h~xsan"><intent_id>1224144</intent_id><project_id>1007623</project_id><text_data>9885737</text_data><comment_date>2022-04-08T00:00:00</comment_date></row><row _id="row-a8wu~quef~miei" _uuid="00000000-0000-0000-B4FB-4355DAFE0733" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a8wu~quef~miei"><intent_id>531498</intent_id><project_id>694889</project_id><text_data>082070</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-8tbi~y2rf~tqge" _uuid="00000000-0000-0000-8784-FD0AE380C904" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8tbi~y2rf~tqge"><intent_id>935448</intent_id><project_id>856799</project_id><text_data>This is a irrigation project for Field Turf Northwest to remove (6) valves, cap mainline, and (1) lateral line around softball field.  It also includes reinstalling a quick coupler at the baseball pitching mound and extends irrigation heads around the field.  We also located 3 irrigation heads for grounds crew.  Tools to be used will include shovels, small hand tools, under 90 Hph trencher and Small dingo Tractor under 90 Hph, wheelbarrow, buckets, and a backpack blower for clean up.  The work will be performed in the city of Redmond in King County.</text_data><comment_date>2018-09-25T00:00:00</comment_date></row><row _id="row-nn8x.nb88_ixb9" _uuid="00000000-0000-0000-E836-30468A851C43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nn8x.nb88_ixb9"><intent_id>1113170</intent_id><project_id>945428</project_id><text_data>203758-006</text_data><comment_date>2021-01-05T00:00:00</comment_date></row><row _id="row-jvbi~2xs9_wsm3" _uuid="00000000-0000-0000-769E-7640EF9F11C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jvbi~2xs9_wsm3"><intent_id>1254521</intent_id><project_id>883908</project_id><text_data>Installation of Hydromulching, Hydroseeding, fine compost, and Bark or Wood Chip Mulch for the purpose of erosion control.Hydromulching and Hydroseeding will be applied using a truck with a GVW of 56,000lbs with a 3500lbs water tank attached to the back capable of mixing mulch, seed, and fertilizer into a slurry that is propelled using a hydrostatic pump.Fine compost and bark mulch will be applied utilizing a truck with a GVW of 52,000lbs, truck can hold 14/CY of matieral.</text_data><comment_date>2022-08-02T00:00:00</comment_date></row><row _id="row-dhys~bay6~2kmg" _uuid="00000000-0000-0000-75D6-67A7DE72FB1B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dhys~bay6~2kmg"><intent_id>605059</intent_id><project_id>715124</project_id><text_data>Gahlbeck 1615 32nd St 9822511/18/2013We are contracted for electrical work. All addresses are single family residence used for living purposes.</text_data><comment_date>2013-11-18T00:00:00</comment_date></row><row _id="row-fbai~ju78.yk8y" _uuid="00000000-0000-0000-6D6F-2079E57A7C0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fbai~ju78.yk8y"><intent_id>981705</intent_id><project_id>882337</project_id><text_data>Lakeside Industries Job No 0319030PacWest Grinding Job No 19-060</text_data><comment_date>2019-06-01T00:00:00</comment_date></row><row _id="row-vkb7.8vu9-849v" _uuid="00000000-0000-0000-E6E6-C6ADD3B13237" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vkb7.8vu9-849v"><intent_id>804161</intent_id><project_id>808010</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2016-12-02T00:00:00</comment_date></row><row _id="row-5afh-2jin~qfya" _uuid="00000000-0000-0000-D8BD-9139EE9FB14D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5afh-2jin~qfya"><intent_id>565328</intent_id><project_id>699190</project_id><text_data>Employees installed sod on top of existing soil. Hand dug with shovel, 4 to 6 inches to install drip irrigation main line. Set drip irrigation on top of existing soil surface. Dug 10 to 12 inches with shovel to plant plants. Filled wheelbarrow with beauty bark with shovels and placed on surface. Spread the beauty bark with rake around drip irrigation and plants.</text_data><comment_date>2013-04-23T00:00:00</comment_date></row><row _id="row-hmqc-u3dh~z7e2" _uuid="00000000-0000-0000-4604-B359D07CB7D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hmqc-u3dh~z7e2"><intent_id>1202549</intent_id><project_id>993811</project_id><text_data>WRI JOB# 22.950/ 47489</text_data><comment_date>2022-01-04T00:00:00</comment_date></row><row _id="row-zh2u~nhdc_y8zd" _uuid="00000000-0000-0000-D266-2157C4237586" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zh2u~nhdc_y8zd"><intent_id>864131</intent_id><project_id>833116</project_id><text_data>General laborer consists of hand work only (no power tools or equipment) $30.53 base + $7.63 pensionBlade operator is used for grading the project before paving or chip sealing operations $34.03 base + $8.51 pensionOther trucks consists of the following:1) 0 to 8,000 gallon water truck used to help with compaction and dust control $22.87 base + $5.72 pension2) Oil distributor is used for distributing oil for chip sealing operations $22.87 base + $5.72 pension</text_data><comment_date>2017-09-20T00:00:00</comment_date></row><row _id="row-siwb.p2py.zub3" _uuid="00000000-0000-0000-E38C-EE1F09F0734B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-siwb.p2py.zub3"><intent_id>716733</intent_id><project_id>765764</project_id><text_data>Filed by Linnie ShaverState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- Elevator Machine Room CoolingPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?Add HVAC cooling to machinery room.2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.) Does this project entail the remodeling or new construction of a facility?No.4.) If your firm is working upon a type of building system, what type of system is involved? HVAC/refrigeration control system.5.) What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer.7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none.8.) Are you going to be hiring any subcontractors for this project?Yes.To expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2015-08-26T00:00:00</comment_date></row><row _id="row-5nrd~tbhk~rwmi" _uuid="00000000-0000-0000-20B1-B969021E67A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5nrd~tbhk~rwmi"><intent_id>583388</intent_id><project_id>715998</project_id><text_data>college PO F703254-1</text_data><comment_date>2013-07-25T00:00:00</comment_date></row><row _id="row-i9c9.en3v_ycan" _uuid="00000000-0000-0000-B1C1-281BC3BCC135" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9c9.en3v_ycan"><intent_id>606517</intent_id><project_id>709011</project_id><text_data>n/a</text_data><comment_date>2013-11-27T00:00:00</comment_date></row><row _id="row-tsr2.7dxs~w4er" _uuid="00000000-0000-0000-F531-8CDEED7C31BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsr2.7dxs~w4er"><intent_id>1257013</intent_id><project_id>1025984</project_id><text_data>304357</text_data><comment_date>2022-08-10T00:00:00</comment_date></row><row _id="row-35ak~j49j.ii7w" _uuid="00000000-0000-0000-260C-F67FD7B2C7A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-35ak~j49j.ii7w"><intent_id>503240</intent_id><project_id>683920</project_id><text_data>single family residence 175th St, Shoreline</text_data><comment_date>2012-03-08T00:00:00</comment_date></row><row _id="row-ir9u_sei3_hekg" _uuid="00000000-0000-0000-793F-FFA49780BD62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ir9u_sei3_hekg"><intent_id>1266913</intent_id><project_id>1031225</project_id><text_data>Wildlands will be maintaining the irrigation and weeding.</text_data><comment_date>2022-09-15T00:00:00</comment_date></row><row _id="row-a4u8~ny76~qnz4" _uuid="00000000-0000-0000-81E7-FCF6E4B6B472" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a4u8~ny76~qnz4"><intent_id>930846</intent_id><project_id>860696</project_id><text_data>King County Metro will require a bus layover loop and a ramp on 9th Ave. while construction is ongoing for the Washington State Convention Center Addition.</text_data><comment_date>2018-09-17T00:00:00</comment_date></row><row _id="row-b9if~9ep8-hkve" _uuid="00000000-0000-0000-EE7A-1E7207AC86D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9if~9ep8-hkve"><intent_id>960799</intent_id><project_id>873494</project_id><text_data>Invoice #T102722, SV36213</text_data><comment_date>2019-02-19T00:00:00</comment_date></row><row _id="row-kvd7~cmry-vbqv" _uuid="00000000-0000-0000-508C-066FA730BA0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvd7~cmry-vbqv"><intent_id>1045776</intent_id><project_id>910161</project_id><text_data>SR#: 46615458</text_data><comment_date>2020-03-17T00:00:00</comment_date></row><row _id="row-a68s-ii4d-49in" _uuid="00000000-0000-0000-59B3-0DE5A02A0580" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a68s-ii4d-49in"><intent_id>549400</intent_id><project_id>701896</project_id><text_data>Kenworth T800/Vactor 2115</text_data><comment_date>2012-12-20T00:00:00</comment_date></row><row _id="row-a8ue~paxe-jsy5" _uuid="00000000-0000-0000-DE1C-8D46BB9E48C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a8ue~paxe-jsy5"><intent_id>902489</intent_id><project_id>849883</project_id><text_data>Supply and delivery of 30% Magnesium Chloride on various locations within Franklin County.  Metered application of 30% Magnesium Chloride on various locations within Franklin County.  Franklin County will be responsible for the preparation work for various roads prior to and after the application.</text_data><comment_date>2018-05-03T00:00:00</comment_date></row><row _id="row-tsyv~4bcr-sjx5" _uuid="00000000-0000-0000-1C8C-60742D5BB393" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tsyv~4bcr-sjx5"><intent_id>812600</intent_id><project_id>811915</project_id><text_data>Landscape maintenance, mowing, edging, etc</text_data><comment_date>2017-01-24T00:00:00</comment_date></row><row _id="row-izvw.ntms-resb" _uuid="00000000-0000-0000-2CE3-DD5E64D2B790" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-izvw.ntms-resb"><intent_id>1418223</intent_id><project_id>1119589</project_id><text_data>inv # 301802</text_data><comment_date>2024-04-10T00:00:00</comment_date></row><row _id="row-9e6h.mhq4-3vm2" _uuid="00000000-0000-0000-10A4-6E3378A5E8A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9e6h.mhq4-3vm2"><intent_id>868423</intent_id><project_id>812674</project_id><text_data>Replacement of irrigation heads (no deeper than 12&amp;quot;). Soil preparation of seeding areas by hand tools including shovels, lawn rakes, rollers, etc.  Seeding and fertilizing by hydromulch blower.</text_data><comment_date>2017-10-11T00:00:00</comment_date></row><row _id="row-rgaa-heqr-khq5" _uuid="00000000-0000-0000-50F4-2F61EBD79D53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rgaa-heqr-khq5"><intent_id>1038816</intent_id><project_id>881957</project_id><text_data>Electrician fringe. NEBF $1.60, H&amp;W $9.40, Pension $8.63, 401K $2.00, JTC $0.68</text_data><comment_date>2020-02-17T00:00:00</comment_date></row><row _id="row-a97b.etp2~az4s" _uuid="00000000-0000-0000-8DF9-431C47AEE4C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a97b.etp2~az4s"><intent_id>760802</intent_id><project_id>790675</project_id><text_data>Our fringe benefit package is $2.79 for medical, dental and vision insurance, $1.60 for paid time off benefits, $.05 for life insurance and the balance for retirement benefits. Our retirement plan is fully compliant with prevailing wage and Davis Bacon laws, including immediate enrollment and 100% vesting of funds.General Laborer job description: General site cleanup, preparing the jobsite, loading and receiving materials and tools, construct temporary structures to support other crafts, safety watch for other crafts</text_data><comment_date>2016-05-09T00:00:00</comment_date></row><row _id="row-6m55.pj6b.d6cp" _uuid="00000000-0000-0000-5E72-2394332D76C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6m55.pj6b.d6cp"><intent_id>837399</intent_id><project_id>818798</project_id><text_data>PN # 40833 SPK</text_data><comment_date>2017-06-01T00:00:00</comment_date></row><row _id="row-djqf_d7ju-c3br" _uuid="00000000-0000-0000-BA3E-E2EE91CA03B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-djqf_d7ju-c3br"><intent_id>943610</intent_id><project_id>865622</project_id><text_data>Filing per MJW</text_data><comment_date>2018-11-02T00:00:00</comment_date></row><row _id="row-i9zh-d7kf.in68" _uuid="00000000-0000-0000-CAA1-F62C4FE29B2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i9zh-d7kf.in68"><intent_id>1061898</intent_id><project_id>913664</project_id><text_data>Job 202310</text_data><comment_date>2020-06-02T00:00:00</comment_date></row><row _id="row-6ruv-q49x.iwaw" _uuid="00000000-0000-0000-4F04-6272BB01B984" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ruv-q49x.iwaw"><intent_id>917119</intent_id><project_id>823933</project_id><text_data>HIRING CONTRACTOR:ARH &amp; ASSOCIATES INC</text_data><comment_date>2018-07-11T00:00:00</comment_date></row><row _id="row-u2ai~jg2d~78uu" _uuid="00000000-0000-0000-59F3-9D7CD887BB7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u2ai~jg2d~78uu"><intent_id>1203003</intent_id><project_id>994137</project_id><text_data>#1-We were contracted to REPLACE GAS FURNACE	. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2022-01-06T00:00:00</comment_date></row><row _id="row-8bxq~svfq.wvv6" _uuid="00000000-0000-0000-95DF-667EE45B5137" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8bxq~svfq.wvv6"><intent_id>786067</intent_id><project_id>801209</project_id><text_data>The entire project consists of installing beauty bark (2&amp;quot; deep) in the flower beds.  The tools to be used are wheel barrows, shovels, and rakes.</text_data><comment_date>2016-08-30T00:00:00</comment_date></row><row _id="row-hxu6_itph~bpgc" _uuid="00000000-0000-0000-EA64-2E5EB887B0F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hxu6_itph~bpgc"><intent_id>1008297</intent_id><project_id>893716</project_id><text_data>OPPlease not the</text_data><comment_date>2019-10-21T00:00:00</comment_date></row><row _id="row-4x9z_fz83_uggg" _uuid="00000000-0000-0000-B155-C70C29F58622" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4x9z_fz83_uggg"><intent_id>622952</intent_id><project_id>722577</project_id><text_data>1113136</text_data><comment_date>2014-04-02T00:00:00</comment_date></row><row _id="row-9szj.ks5v~5dj7" _uuid="00000000-0000-0000-7245-01EEF62CC554" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9szj.ks5v~5dj7"><intent_id>575236</intent_id><project_id>713262</project_id><text_data>Health    7.45Pension   6.18Annuity   1.75NEBF      1.41Total   $16.79</text_data><comment_date>2013-06-14T00:00:00</comment_date></row><row _id="row-4z8f~g87b-7yy9" _uuid="00000000-0000-0000-65E4-7A2546E1586F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4z8f~g87b-7yy9"><intent_id>594633</intent_id><project_id>714027</project_id><text_data>Electricians � Inside:Health: $7.45Pension: $9.21Training: $0.58Total: $17.24</text_data><comment_date>2013-09-18T00:00:00</comment_date></row><row _id="row-92sz_ujq5.tg35" _uuid="00000000-0000-0000-B110-E5E51570C9C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-92sz_ujq5.tg35"><intent_id>1096416</intent_id><project_id>913407</project_id><text_data>JCI Project number 0N59-0134</text_data><comment_date>2020-10-16T00:00:00</comment_date></row><row _id="row-4dze-eb98~m4fk" _uuid="00000000-0000-0000-BA99-6C5039FEE5EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4dze-eb98~m4fk"><intent_id>1054222</intent_id><project_id>917145</project_id><text_data>SRO 1907809</text_data><comment_date>2020-04-27T00:00:00</comment_date></row><row _id="row-x4n8~m6cu~idjk" _uuid="00000000-0000-0000-A718-E0EFA633E5FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x4n8~m6cu~idjk"><intent_id>1509906</intent_id><project_id>1170669</project_id><text_data>SS00093, K10843, 02919 DES MASTER AGREEMENT, MULT SO</text_data><comment_date>2025-02-14T00:00:00</comment_date></row><row _id="row-nevb.7sny.dm6h" _uuid="00000000-0000-0000-EA0A-FAB408386529" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nevb.7sny.dm6h"><intent_id>1509837</intent_id><project_id>1170625</project_id><text_data>Spokane - 2025 Annual MaintenanceFringes: 2025 Fringe Benefits - Health Plan 16.275, Pension Plan 10.960, Educational Fund 0.80 Preservation Fund 1.60 Annuity 10.40, Vacation/Holiday 7.64 = 47.99 Rounded</text_data><comment_date>2025-02-13T00:00:00</comment_date></row><row _id="row-udk7.dajq~4hgs" _uuid="00000000-0000-0000-D78B-489CD1600AE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-udk7.dajq~4hgs"><intent_id>1510042</intent_id><project_id>1170761</project_id><text_data>9964417</text_data><comment_date>2025-02-14T00:00:00</comment_date></row><row _id="row-y8bu.u8by_ahpz" _uuid="00000000-0000-0000-023A-7EEA49EB5F5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y8bu.u8by_ahpz"><intent_id>1501492</intent_id><project_id>1165463</project_id><text_data>Wx work 2. Y 3. 1 4. residence a.n b. n c. y d.n e. n f. n g. n h. n i. n j. n k. n l. n 5. y 6. y 7. n 8 n</text_data><comment_date>2025-01-15T00:00:00</comment_date></row><row _id="row-tum2-gmfy~q6vx" _uuid="00000000-0000-0000-D800-EDFF007D69E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tum2-gmfy~q6vx"><intent_id>1511128</intent_id><project_id>1156337</project_id><text_data>A. GC to Provide Oven to be Installed in  School Kitchen.B.  J &amp; K Received Oven and delivered to the school kitchen.C.  J &amp; K put the oven on 4 wheel  carts and delivered it to the school.  Used our truck with lift gate to take it off the truck and then wheeled it into the kitchen and set in place.</text_data><comment_date>2025-03-27T00:00:00</comment_date></row><row _id="row-bmkf_brkj~bjzs" _uuid="00000000-0000-0000-8668-9C0C0EBD495A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmkf_brkj~bjzs"><intent_id>582307</intent_id><project_id>709840</project_id><text_data>Form filed by: Michael HummelState of WA - Dept. of L&amp;I - Prevailing Wage DivisionExemption Intent Questionnaire form - 10451 Sunnyside Fire Station Addition/RenovationPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:******1. What is the specific purpose of this awarding agency's public works project?    Installation of new HVAC controls.******2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?    No******3. Does this project entail the remodeling? Yes, but not performed by Siemens Employees.******4. If your firm is working upon a type of building system, what type of system is involved? HVAC control system.******5. What specific tasks did your employees perform?    Siemens' BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.******6. What, if any, tools did your employees use in the performance of those tasks?    Laptop computer******7. If your employee used no tools, did they engage in any other type of manual, hands on efforts in completing their tasks?    No - none.******8. Are you going to be hiring any subcontractors for this project?    Yes.******To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form. To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2013-07-19T00:00:00</comment_date></row><row _id="row-3c3g-gfw8-awxr" _uuid="00000000-0000-0000-6968-06D2685F5C8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3c3g-gfw8-awxr"><intent_id>1012407</intent_id><project_id>895337</project_id><text_data>Remove sod and 8 inches of soil with an excavator and haul away. Spread 5 inches depth of delivered 5/8 minus gravel and compact with compactor. Provide and install plastic border by digging 2 inch trench and placing plastic border within. Place borders end to end and stick steel spike in to attach together around playground area.</text_data><comment_date>2019-10-05T00:00:00</comment_date></row><row _id="row-k6ss~wzcr~7svj" _uuid="00000000-0000-0000-B8F1-7AA60B080FEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k6ss~wzcr~7svj"><intent_id>701910</intent_id><project_id>765323</project_id><text_data>General Laborer-raking &amp; shovel assisting owner.</text_data><comment_date>2015-07-01T00:00:00</comment_date></row><row _id="row-jk96~qcmg_5rnv" _uuid="00000000-0000-0000-7B44-44293BC58463" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jk96~qcmg_5rnv"><intent_id>941578</intent_id><project_id>864769</project_id><text_data>#20255, Bruce, Elfriede, 559 E Garland, Spokane</text_data><comment_date>2018-10-24T00:00:00</comment_date></row><row _id="row-qhuu_yp88.92hb" _uuid="00000000-0000-0000-018A-9C088801EEAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qhuu_yp88.92hb"><intent_id>639628</intent_id><project_id>736415</project_id><text_data>Prime Job# 514-3220</text_data><comment_date>2014-07-08T00:00:00</comment_date></row><row _id="row-fje7.apvk-fyp9" _uuid="00000000-0000-0000-74E8-404D370872E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fje7.apvk-fyp9"><intent_id>689139</intent_id><project_id>760008</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2015-04-15T00:00:00</comment_date></row><row _id="row-g9sb.gjf9.g7ir" _uuid="00000000-0000-0000-6329-33E27E870AE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g9sb.gjf9.g7ir"><intent_id>542378</intent_id><project_id>697708</project_id><text_data>WE ARE AN OREGON COMPANY AND OUR OREGON WORKERS COMP COVERS US WHILE WORKING IN WASHINGTON</text_data><comment_date>2012-10-31T00:00:00</comment_date></row><row _id="row-49c9-tav2_yija" _uuid="00000000-0000-0000-ACCB-6F0677E5E3DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49c9-tav2_yija"><intent_id>965019</intent_id><project_id>875463</project_id><text_data>#18-805</text_data><comment_date>2019-03-13T00:00:00</comment_date></row><row _id="row-m2g3_u3qk-5s57" _uuid="00000000-0000-0000-92FD-A727F8587DD5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2g3_u3qk-5s57"><intent_id>947108</intent_id><project_id>853325</project_id><text_data>I am Zahid Ricardo Salazar Sanchez, I&amp;#39;m the owner of Salazars Caves painting and I did the work alone.</text_data><comment_date>2019-03-22T00:00:00</comment_date></row><row _id="row-bg3j~un53~sh5v" _uuid="00000000-0000-0000-36D5-8C1A1240CDDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bg3j~un53~sh5v"><intent_id>1165916</intent_id><project_id>972327</project_id><text_data>job: Sheldon</text_data><comment_date>2021-08-03T00:00:00</comment_date></row><row _id="row-akys-3aem_nsse" _uuid="00000000-0000-0000-E40A-C5F3A38BE932" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-akys-3aem_nsse"><intent_id>591068</intent_id><project_id>702502</project_id><text_data>The Telecommunications Techs are responsible for installation of communications infrastructure at the WSU campus in Pullman, WA. The work is performed indoors and entails the pulling of cables through the ceiling and walls of the new building.</text_data><comment_date>2013-09-12T00:00:00</comment_date></row><row _id="row-u3eg-3u88.bh2x" _uuid="00000000-0000-0000-D95F-9F4E781E4DB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u3eg-3u88.bh2x"><intent_id>1362494</intent_id><project_id>1086588</project_id><text_data>2023-2024 PIERCE COLLEGE PUYALLUP BACKFLOWS (62533)</text_data><comment_date>2023-09-11T00:00:00</comment_date></row><row _id="row-xin9.zi8i~d7xw" _uuid="00000000-0000-0000-EDC9-D6D111FAA549" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xin9.zi8i~d7xw"><intent_id>496498</intent_id><project_id>675379</project_id><text_data>WE ARE AN OREGON CORPORATION AND OUR WORKERS COMP COVERS US WHILE WE ARE WORKING IN WASHINGTON.</text_data><comment_date>2012-01-11T00:00:00</comment_date></row><row _id="row-n9sc.cd2p_fq53" _uuid="00000000-0000-0000-C61A-807988F6EF39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n9sc.cd2p_fq53"><intent_id>1283985</intent_id><project_id>1041120</project_id><text_data>Job # S1074</text_data><comment_date>2022-11-16T00:00:00</comment_date></row><row _id="row-asnx_ncji_cct5" _uuid="00000000-0000-0000-2E34-C1CFC234D4FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-asnx_ncji_cct5"><intent_id>1027967</intent_id><project_id>902575</project_id><text_data>Trucks driven will be 8 to 10 foot utility vans hauling materials and equipment</text_data><comment_date>2019-12-19T00:00:00</comment_date></row><row _id="row-pi37~sp8z~2n6v" _uuid="00000000-0000-0000-456A-53F4EBD62D2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pi37~sp8z~2n6v"><intent_id>788562</intent_id><project_id>802192</project_id><text_data>PC6 - 905-01CE</text_data><comment_date>2016-09-12T00:00:00</comment_date></row><row _id="row-fqec_cx5k.b2b3" _uuid="00000000-0000-0000-89C4-7BAE29528C89" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fqec_cx5k.b2b3"><intent_id>892383</intent_id><project_id>845631</project_id><text_data>Denise Brown is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing a new ductless heat pump, new bathroom fan, new CO detector and performing an electrical safety inspection. This job meets the residential job requirements.</text_data><comment_date>2018-03-12T00:00:00</comment_date></row><row _id="row-973t~hcp9.dazq" _uuid="00000000-0000-0000-80BE-BEE36F4DF885" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-973t~hcp9.dazq"><intent_id>975458</intent_id><project_id>850873</project_id><text_data>UBI is incorrect the correct # is 603471774</text_data><comment_date>2019-05-08T00:00:00</comment_date></row><row _id="row-66ur.7g34.twd6" _uuid="00000000-0000-0000-3AFE-E62814D194CB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-66ur.7g34.twd6"><intent_id>992992</intent_id><project_id>887632</project_id><text_data>Install 11 new CAT6 plenum rated yellow cables and reroute 10 existing cables to the 19 different locations in 3 furniture reconfiguration. All newly installed and rerouted cables will be labeled and pass testing before job is complete. Cables will be used for voice and data. No outside work was done.</text_data><comment_date>2019-07-18T00:00:00</comment_date></row><row _id="row-j2eq~5id7_426f" _uuid="00000000-0000-0000-08DE-44D863FC34E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j2eq~5id7_426f"><intent_id>770938</intent_id><project_id>795481</project_id><text_data>Installation of voice/data cable to multiple workstations for either telephone (voice over distance) or data (bits and bytes) connection within the telecommunications system.  All work will be performed indoors.</text_data><comment_date>2016-06-27T00:00:00</comment_date></row><row _id="row-wn8a-y2cj.9ksp" _uuid="00000000-0000-0000-7066-53D53D8F2CA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wn8a-y2cj.9ksp"><intent_id>1109644</intent_id><project_id>923697</project_id><text_data>truck is a 3,000 gallon truck mounted hydroseeder</text_data><comment_date>2020-12-14T00:00:00</comment_date></row><row _id="row-53zt-8zjq~26u2" _uuid="00000000-0000-0000-9221-5ADE5103357A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-53zt-8zjq~26u2"><intent_id>544641</intent_id><project_id>699747</project_id><text_data>The scope of the first part of the job was installing a 12&amp;quot; lift of top soil under the contract. This wage portion of the job was paid as Equipment Operator wage. Then Washington State Patrol hired us as a change order to rake and install sod.  The equipment used in this portion of the job were rakes and a sod cutter.  The sod cutter was operated by Earl Groendyk (owner).</text_data><comment_date>2012-12-03T00:00:00</comment_date></row><row _id="row-t8yb_bhix_wue6" _uuid="00000000-0000-0000-57D2-4E3AB349C4BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t8yb_bhix_wue6"><intent_id>1023917</intent_id><project_id>898151</project_id><text_data>0608-04 Telephone and/or telephonic equipment - Prewire by contractor: Installation, service, and/or repair. Installation of indoor telecommunications cabling - voice + data transmissions at 5929 W Metaline Ave Kennewick, WA 99336</text_data><comment_date>2019-11-26T00:00:00</comment_date></row><row _id="row-77bk_qqbq_khr6" _uuid="00000000-0000-0000-CD64-F0308A124E96" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-77bk_qqbq_khr6"><intent_id>793098</intent_id><project_id>787456</project_id><text_data>Fire alarm to portables</text_data><comment_date>2016-09-30T00:00:00</comment_date></row><row _id="row-hdvc-hbdp~xjyc" _uuid="00000000-0000-0000-1B9F-5A2DC65B853E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hdvc-hbdp~xjyc"><intent_id>922743</intent_id><project_id>855316</project_id><text_data>PC6 - Job #630466032297CB</text_data><comment_date>2018-08-02T00:00:00</comment_date></row><row _id="row-mc8j_75rt.87b2" _uuid="00000000-0000-0000-2E0A-CCF05D40B583" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mc8j_75rt.87b2"><intent_id>786143</intent_id><project_id>801229</project_id><text_data>Workers Keith Burrell and Mike Poe. 1.weatherization 2.SFD 3.one 4a,b,no c,yes d,e,f,g,h,i,j,no 5,6,yes 7,8,no</text_data><comment_date>2016-08-30T00:00:00</comment_date></row><row _id="row-bye3~j5kt.pbs9" _uuid="00000000-0000-0000-792A-0E8F1F6C3E93" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bye3~j5kt.pbs9"><intent_id>1291197</intent_id><project_id>1045683</project_id><text_data>7310167</text_data><comment_date>2022-12-20T00:00:00</comment_date></row><row _id="row-ky5d_bxhm.3ay6" _uuid="00000000-0000-0000-A399-131BF8D2EEA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ky5d_bxhm.3ay6"><intent_id>588148</intent_id><project_id>704635</project_id><text_data>Filed by Kim BurnsideThis intent is for Bid Package #113</text_data><comment_date>2013-08-16T00:00:00</comment_date></row><row _id="row-z3p5.f8qd.dgqj" _uuid="00000000-0000-0000-A053-1A868FCA57F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z3p5.f8qd.dgqj"><intent_id>896961</intent_id><project_id>847603</project_id><text_data>PO#46045-Berg</text_data><comment_date>2018-04-05T00:00:00</comment_date></row><row _id="row-wybt~ms2g_u9yz" _uuid="00000000-0000-0000-F98D-B0E79C3CD008" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wybt~ms2g_u9yz"><intent_id>459220</intent_id><project_id>667475</project_id><text_data>Listing Truck Drivers/Other Trucks classification on this &amp;quot;Intent&amp;quot; was my error.  We will NOT be using this classification on this project.</text_data><comment_date>2011-06-23T00:00:00</comment_date></row><row _id="row-naty-ji3q.63ea" _uuid="00000000-0000-0000-3E1C-01302AA16C49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-naty-ji3q.63ea"><intent_id>934070</intent_id><project_id>857523</project_id><text_data>Unknown about of employees at this time.</text_data><comment_date>2018-09-19T00:00:00</comment_date></row><row _id="row-ss6s.rday_9jbq" _uuid="00000000-0000-0000-4F2E-1CABE0AE957B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ss6s.rday_9jbq"><intent_id>936859</intent_id><project_id>862824</project_id><text_data>Sewage clean up in crawl space</text_data><comment_date>2018-10-02T00:00:00</comment_date></row><row _id="row-4txt-ejb5~29bp" _uuid="00000000-0000-0000-CA44-F14C090A3D05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4txt-ejb5~29bp"><intent_id>920987</intent_id><project_id>847055</project_id><text_data>Gentry548 Sprague StreetWilson Creek, WA 98832</text_data><comment_date>2018-07-26T00:00:00</comment_date></row><row _id="row-58ib~mu5f_5gf3" _uuid="00000000-0000-0000-FED7-F7B1362F9F68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-58ib~mu5f_5gf3"><intent_id>479995</intent_id><project_id>669859</project_id><text_data>THE PRIME HIRED US</text_data><comment_date>2011-09-23T00:00:00</comment_date></row><row _id="row-zdbk~cnfw~9cv3" _uuid="00000000-0000-0000-36E7-19BD9A7697F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdbk~cnfw~9cv3"><intent_id>1246910</intent_id><project_id>1020793</project_id><text_data>COB Meydenbauer Park weeding WO #118673Per Cody HemphillWeeding and grubbing by hand and with hand tools.</text_data><comment_date>2022-07-07T00:00:00</comment_date></row><row _id="row-dff3.k99c-2246" _uuid="00000000-0000-0000-C722-0A76A48F479E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dff3.k99c-2246"><intent_id>1259810</intent_id><project_id>1027452</project_id><text_data>#1 - Tenant improvement on already existing building. Permitted work is only for the ground floor and second floor.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Other residential.#3 - Including any basement or garage, how many stories or levels does the structure have? 6 existing stories - permitted for work on first two only.#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? No(b) Any retail use in the structure? No(c) Permanent residence only? Yes(d) Rehabilitation house? No(e) Transitional housing? No(f) Communal dining facility? No(g) Treatment services? No(h) Assisted living services? No(I) Dormitories? No(j) Counseling? Yes(k) Is each room and/or bed in the structure rented separately? No, each studio unit is rented separately.(l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? Yes#6 - Does each dwelling unit have its own bathroom? Yes#7 - Is there a community facility or manager�s office on site? Yes#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2022-09-08T00:00:00</comment_date></row><row _id="row-xtmv.gpc7~m34w" _uuid="00000000-0000-0000-E2F1-9E468FA1AAF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xtmv.gpc7~m34w"><intent_id>486078</intent_id><project_id>677089</project_id><text_data>Locations: Educational Service Center; Martha Lake Elem; Mountlake Terrace HS; Edmonds Elem;Edmonds Woodway Hs; Meadowdale HS; Chase Lake Elem; Meadowdale Elem; Maplewood K-8 School; Cedar Valley comm School; Lynnwood HS and Terrace Park School.</text_data><comment_date>2011-10-27T00:00:00</comment_date></row><row _id="row-84rs_djb3~anra" _uuid="00000000-0000-0000-7974-AA7716FAFEF2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-84rs_djb3~anra"><intent_id>807581</intent_id><project_id>809550</project_id><text_data>Apartment fire with water damage from fire department.  Our crew entered the residence to extract the water and prevent secondary damage, perform emergency services.  Tools/Equipment utilized:  Truck w/ truck mount, hoses, misc extraction tools, air movers, dehumidifiers, monitoring equipment.</text_data><comment_date>2016-12-23T00:00:00</comment_date></row><row _id="row-3nhf_kmne_rsm5" _uuid="00000000-0000-0000-DECA-A37F59AD6A12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3nhf_kmne_rsm5"><intent_id>1111315</intent_id><project_id>944329</project_id><text_data>Inv #27442 - Everett 911 - CRAC 2 Repairs</text_data><comment_date>2020-12-21T00:00:00</comment_date></row><row _id="row-mqxa-rupm-mfpa" _uuid="00000000-0000-0000-2605-6F30A3174555" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mqxa-rupm-mfpa"><intent_id>510634</intent_id><project_id>687137</project_id><text_data>Prairie Electric, Inc.�s fringe packages only include Health Plan, Vacation Plan, Holiday Plan, Pension Plan, and Apprentice Program.</text_data><comment_date>2012-05-04T00:00:00</comment_date></row><row _id="row-39n2_gekn-8bhj" _uuid="00000000-0000-0000-197D-47854244BD6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39n2_gekn-8bhj"><intent_id>639682</intent_id><project_id>730510</project_id><text_data>Installation and termination of copper UTP cabling for computer network inside elementary school portable classroom building. Conforms to WAC 296-127-01378 for work inside a building and terminating in MDF and IDF locations. Further complies with RCW19.28.400(13)(a) Telecommunications systems encompass all forms of information generation, processing, and transporting of signals conveyed electronically or optically within or between buildings, including voice, data, video, and audio.  Work is not specifically called out as Electronic Technician scope.</text_data><comment_date>2014-07-08T00:00:00</comment_date></row><row _id="row-m872.c98n.jpx9" _uuid="00000000-0000-0000-4ED3-4446B9DFB7EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m872.c98n.jpx9"><intent_id>1121436</intent_id><project_id>950059</project_id><text_data>1:Construction of (6) houses2:Single family3: 1-storie4a: No4b: No4c: No4d: No4e: No4f: No4g: No4h: No4i: No4j: No4k: No4l: No5: Yes6: Yes7: No8: No</text_data><comment_date>2021-02-10T00:00:00</comment_date></row><row _id="row-qgcc~u5d4.np2x" _uuid="00000000-0000-0000-03D1-60D8BE757488" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qgcc~u5d4.np2x"><intent_id>1362577</intent_id><project_id>973482</project_id><text_data>?</text_data><comment_date>2023-09-12T00:00:00</comment_date></row><row _id="row-b22w-ww7e~vfiz" _uuid="00000000-0000-0000-D11A-0FFE5B8D4B66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b22w-ww7e~vfiz"><intent_id>929475</intent_id><project_id>812124</project_id><text_data>We will be installing approximately 25 yards of bar in landscape beds using our blower trucks. If cleanup is required we will also use leaf blowers. Each truck should have 1 driver 1 laborer.</text_data><comment_date>2018-08-29T00:00:00</comment_date></row><row _id="row-r5wp-h6xy_y23r" _uuid="00000000-0000-0000-F101-0CCD96A8EA61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5wp-h6xy_y23r"><intent_id>558273</intent_id><project_id>697263</project_id><text_data>FRINGE RATE:PENSION         9.20H &amp; W           6.77APPR             .63ANNUITY         4.00IMP              .28IND              .01TOTAL FRINGE   20.89</text_data><comment_date>2013-03-01T00:00:00</comment_date></row><row _id="row-h2j9-m4yb~x689" _uuid="00000000-0000-0000-6105-2D50E9D1AA27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2j9-m4yb~x689"><intent_id>733663</intent_id><project_id>777840</project_id><text_data>1)We were contracted to replace a gas furnace. 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-waii_wem6-pjb6" _uuid="00000000-0000-0000-2ECD-C92148186915" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-waii_wem6-pjb6"><intent_id>886698</intent_id><project_id>842973</project_id><text_data>PC6 - Job #902-11PO #1941700232Invoice #39212261CB</text_data><comment_date>2018-02-05T00:00:00</comment_date></row><row _id="row-yzx8.42rd.njx4" _uuid="00000000-0000-0000-9E68-46A618263F5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yzx8.42rd.njx4"><intent_id>728844</intent_id><project_id>775624</project_id><text_data>Clean Homeless encampmentHazWaste Workers to clear all debris from area using brooms, shovels, rakes and/or small hand tools</text_data><comment_date>2015-10-29T00:00:00</comment_date></row><row _id="row-sxhb.uxut-pe2z" _uuid="00000000-0000-0000-7798-D04E2EBCFC6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sxhb.uxut-pe2z"><intent_id>975400</intent_id><project_id>872098</project_id><text_data>611753503	Lakeland Village - Chiller Bld</text_data><comment_date>2019-05-02T00:00:00</comment_date></row><row _id="row-in5f.26ah~p37e" _uuid="00000000-0000-0000-54BC-2160CF9460CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-in5f.26ah~p37e"><intent_id>1212911</intent_id><project_id>1000371</project_id><text_data>Labor SRO 1914941</text_data><comment_date>2022-02-21T00:00:00</comment_date></row><row _id="row-g5pg~zpdg~2cm6" _uuid="00000000-0000-0000-B2E7-3EFE0689F968" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g5pg~zpdg~2cm6"><intent_id>1183946</intent_id><project_id>979508</project_id><text_data>Lakeside job# 0421139TRUCKS - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2021-10-07T00:00:00</comment_date></row><row _id="row-g7t2_tzjd~xhnj" _uuid="00000000-0000-0000-59B0-0EBDC72FC8D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g7t2_tzjd~xhnj"><intent_id>733666</intent_id><project_id>759990</project_id><text_data>Replace side walks, sprinklers and sod</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-39qi~igec~9nt6" _uuid="00000000-0000-0000-72BF-640A6E6E543C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39qi~igec~9nt6"><intent_id>1248491</intent_id><project_id>1020888</project_id><text_data>Owner Operated</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-4idn~tg95-zkci" _uuid="00000000-0000-0000-1CCC-969366FF2D92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4idn~tg95-zkci"><intent_id>1088445</intent_id><project_id>920757</project_id><text_data>Planting, installation topsoil, mulch plants</text_data><comment_date>2020-09-16T00:00:00</comment_date></row><row _id="row-xz8z~fjnh_xmyt" _uuid="00000000-0000-0000-B465-3CCF3560B133" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xz8z~fjnh_xmyt"><intent_id>878444</intent_id><project_id>839056</project_id><text_data>Motor Patrol Grader to vacuum area for new poleHaz Waste worker to clear area of all debris using shovel/rake</text_data><comment_date>2017-12-11T00:00:00</comment_date></row><row _id="row-8cmk~3hu8-v63s" _uuid="00000000-0000-0000-2C07-23C8F0956CE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8cmk~3hu8-v63s"><intent_id>973142</intent_id><project_id>879127</project_id><text_data>86181 Twin Rivers Group Home Range</text_data><comment_date>2019-04-22T00:00:00</comment_date></row><row _id="row-7t73-xn6n-exmh" _uuid="00000000-0000-0000-8841-C39046CB3B80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7t73-xn6n-exmh"><intent_id>996792</intent_id><project_id>809339</project_id><text_data>Filed by Michael Okafor</text_data><comment_date>2019-08-02T00:00:00</comment_date></row><row _id="row-sz4c-entp-v7mh" _uuid="00000000-0000-0000-E788-CD6527760A63" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sz4c-entp-v7mh"><intent_id>760413</intent_id><project_id>786137</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2016-05-05T00:00:00</comment_date></row><row _id="row-gj9z_9c6p.mfub" _uuid="00000000-0000-0000-5E04-E3E3F8EDD3E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gj9z_9c6p.mfub"><intent_id>1169089</intent_id><project_id>975113</project_id><text_data>Landscape and Irrigation workers will beused to plant trees, ground covers, and plant sod. They will pacemulch and topsoil. They will perform maintenance. They will use 50 hp bobcat, mini excavator to trench 24' for landscape irrigation. Lawn mowers,  edgers, handtools and pick up trucks.</text_data><comment_date>2021-08-13T00:00:00</comment_date></row><row _id="row-7dtz~nrdx-j3ev" _uuid="00000000-0000-0000-C0F9-2BEF220461AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7dtz~nrdx-j3ev"><intent_id>808698</intent_id><project_id>808220</project_id><text_data>Filed by Robin Romans</text_data><comment_date>2016-12-27T00:00:00</comment_date></row><row _id="row-cu7j~cjx4_mpsa" _uuid="00000000-0000-0000-8F93-356094BD1017" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cu7j~cjx4_mpsa"><intent_id>1027041</intent_id><project_id>902074</project_id><text_data>9838773</text_data><comment_date>2019-12-16T00:00:00</comment_date></row><row _id="row-gcji~fvgi~tqme" _uuid="00000000-0000-0000-C7DC-CD573364048B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gcji~fvgi~tqme"><intent_id>1510195</intent_id><project_id>1137325</project_id><text_data>removal of multiple trees.</text_data><comment_date>2025-02-15T00:00:00</comment_date></row><row _id="row-4yfh-ri5m~rtn3" _uuid="00000000-0000-0000-A4EA-C4D746ADC816" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4yfh-ri5m~rtn3"><intent_id>1508611</intent_id><project_id>1169860</project_id><text_data>This is a landscape maintenance contract. We will be using lawnmowers, weedeaters, backpack blowers, handtools including pruners, loppers, rakes. We will be mowing lawns, raking beds, picking up garbage and minor pruning to shrubs and trees. Maintaining landscape irrigation</text_data><comment_date>2025-02-10T00:00:00</comment_date></row><row _id="row-4a2x-hur8_pwqd" _uuid="00000000-0000-0000-3855-9FE31FCAACDC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4a2x-hur8_pwqd"><intent_id>1071518</intent_id><project_id>921325</project_id><text_data>Prevailing wage issues are very fact specific. In order for us to evaluate if the work to be performed by BAS Technician is not covered for the City of Kennewick Fire Station project, we need to know more about the project and the tasks your employees perform in conjunction with this project. Please provide us with the following information: What is the specific purpose of this awarding agency�s public works project? Examples are: Install HVAC Controls Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)] No.Does this specific project entail the remodeling or new construction of a facility? New ConstructionIf your firm is working upon a type of building system, what type of system is involved? HVAC/refrigeration control systemWhat specific tasks will your employees perform?  Controls check out, commissioning and programming of the new controls components.What, if any, tools will your employees use in the performance of those tasks? Computer, computer software, electrical metersIf your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? NoAre you going to be hiring any subcontractors for this project? Yes, Static Energy Inc.</text_data><comment_date>2020-07-10T00:00:00</comment_date></row><row _id="row-n2kv-9nfd.24sw" _uuid="00000000-0000-0000-030C-83DB52328D7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2kv-9nfd.24sw"><intent_id>639986</intent_id><project_id>738954</project_id><text_data>#1 - Attic insulation upgrades including insulation, baffles, foam penetrations, weatherstrip access, and install bath vent.#2 - Single family#3 - One level#4 - (a) no, (b) no, (c) yes, (d) no, (e) no, (f) no, (g) no, (h) no, (i) no, (j) no, (k) no#5 - yes (one dwelling unit; residential home)#6 - yes (one dwelling unit; residential home)#7 - no#8 - no</text_data><comment_date>2014-07-09T00:00:00</comment_date></row><row _id="row-35fp.bijy.gmp7" _uuid="00000000-0000-0000-845D-09C8A0EF4966" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-35fp.bijy.gmp7"><intent_id>730102</intent_id><project_id>774579</project_id><text_data>Estimated pay rate is $63.00/hour per Michael Lennox-Leed Staffing West, LLC</text_data><comment_date>2015-11-05T00:00:00</comment_date></row><row _id="row-ym4s_vex2-sdp7" _uuid="00000000-0000-0000-C407-879323B04454" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ym4s_vex2-sdp7"><intent_id>661370</intent_id><project_id>747044</project_id><text_data>*We will have 2 laborers and 2 operators on site who will perform work and be paid according to the respective classifications above over the course of the project.</text_data><comment_date>2014-10-29T00:00:00</comment_date></row><row _id="row-drmg_k4up~7443" _uuid="00000000-0000-0000-3F02-A382A0EF3FC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-drmg_k4up~7443"><intent_id>655327</intent_id><project_id>737933</project_id><text_data>Labor Ready is a temporary labor service provider and is therefore exempt from the requirement to obtain a contractors license.</text_data><comment_date>2014-09-17T00:00:00</comment_date></row><row _id="row-phid-wbia-qgax" _uuid="00000000-0000-0000-6209-CD25C58EB8F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-phid-wbia-qgax"><intent_id>762899</intent_id><project_id>792311</project_id><text_data>CompView Inc. contact:  Andrea Maticka  206.694.1301</text_data><comment_date>2016-05-18T00:00:00</comment_date></row><row _id="row-9rdh~7wrg_xpqa" _uuid="00000000-0000-0000-24DF-FD66F1A72718" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9rdh~7wrg_xpqa"><intent_id>951717</intent_id><project_id>869137</project_id><text_data>Paul Clark 122 Cross Creek Dr. Ellensburg, WA 98926Marianne Bell 903 1/2 E Tacoma Ave. Ellensburg, WA 98926Vicki Morgan 412 N. Lincoln St. Ellensburg, WA 98926Richard Guthrie 580 Sunrise Drive Ellensburg, WA 98926Amy Weisberg 903 E Tacoma Ave Ellensburg, WA 98926Amy Trudell 905 W. Cascade Ct. #59 Ellensburg, WA 98926J. Duenez 1207 W University Way #1 Ellensburg, WA 98926Eva Urbaniak 811 West Bender Rd. Ellensburg, WA 98926Karen Johnson 2601 Hannah Rd. Ellensburg, WA 98926Joanie Lee 10141 Naneum Rd. Ellensburg, WA 98926Leslie Cruz 2900 Canyon Road #48 Ellensburg, WA 98926</text_data><comment_date>2018-12-20T00:00:00</comment_date></row><row _id="row-7uub_48ci_swz3" _uuid="00000000-0000-0000-7355-439C50F50AEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7uub_48ci_swz3"><intent_id>1068275</intent_id><project_id>922399</project_id><text_data>LONG Job # 5020.200232</text_data><comment_date>2020-06-26T00:00:00</comment_date></row><row _id="row-psgc.dz2g_a2b2" _uuid="00000000-0000-0000-D7CA-B3C39209E993" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-psgc.dz2g_a2b2"><intent_id>1116735</intent_id><project_id>910845</project_id><text_data>1 - Electrical; 2 - single family dwelling; 3 - one; 4a - no; 4b - no; 4c - yes; 4d - no; 4e - no; 4f - no; 4g - no; 4h - no; 4i - no; 4j - no; 4k - no; 5 - yes; 6 - yes; 7 - no; 8 - no</text_data><comment_date>2021-01-21T00:00:00</comment_date></row><row _id="row-7cx9-342f.7bwu" _uuid="00000000-0000-0000-AB1E-3284C804E511" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7cx9-342f.7bwu"><intent_id>991657</intent_id><project_id>887134</project_id><text_data>P149812 INV 87185 2019 Backflow Testing</text_data><comment_date>2019-07-13T00:00:00</comment_date></row><row _id="row-je2n_jnya_h8xm" _uuid="00000000-0000-0000-387D-AECDCAC5F74F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-je2n_jnya_h8xm"><intent_id>1263792</intent_id><project_id>1029465</project_id><text_data>1-cleaning of furnace 2-single family 3-1 level, 4-living, a-no, b-no, c-yes, d-no, e-no, e-no, f-no, g-no, h-no, i-no, j-no, k-no 5-no 6-no 7-no 8-no</text_data><comment_date>2022-09-02T00:00:00</comment_date></row><row _id="row-5ata_9cri_374v" _uuid="00000000-0000-0000-B4C8-28FD8E3194F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5ata_9cri_374v"><intent_id>551903</intent_id><project_id>703038</project_id><text_data>�	#1 - Describe the work that your firm was contracted to perform. Fire Damage Repair�	#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment�	#3 - Including any basement or garage, how many stories or levels does the structure have? 3�	#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:  �	(a) Any commercial use in the structure? No�	(b) Any retail use in the structure? No�	(c) Permanent residence only? No�	(d) Rehabilitation house? No�	(e) Transitional housing? No�	(f) Communal dining facility? No�	(g) Treatment services? No�	(h) Dormitories? No�	(i) Counseling? No�	(j) Is each room and/or bed in the structure rented separately? No�	(k) Other? No�	#5 - Does each dwelling unit have its own self-contained kitchen? Yes�	#6 - Does each dwelling unit have its own bathroom? Yes�	#7 - Is there a community facility or manager�s office on site? Yes�	#8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2013-01-16T00:00:00</comment_date></row><row _id="row-pa8v.eevd-hhtm" _uuid="00000000-0000-0000-BD2B-83C34A226ED6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pa8v.eevd-hhtm"><intent_id>1076213</intent_id><project_id>909454</project_id><text_data>201246-Per WA-296-127-01378 Telecommunication Technicians will be installing cabling for telephone, computers and wireless access points (wireless data) for internet access. Fiber Optic Backbone cabling for connectivity between MDF &amp; IDF's.  Cable will be ran indoors. Terminate, test and label.</text_data><comment_date>2020-07-29T00:00:00</comment_date></row><row _id="row-zw45~mxc4.jjuc" _uuid="00000000-0000-0000-23FC-56573DA6F944" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zw45~mxc4.jjuc"><intent_id>1177933</intent_id><project_id>979507</project_id><text_data>9875264</text_data><comment_date>2021-09-16T00:00:00</comment_date></row><row _id="row-78ze_qfze~ddgs" _uuid="00000000-0000-0000-58E7-DD2E68F30891" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-78ze_qfze~ddgs"><intent_id>1237438</intent_id><project_id>1015502</project_id><text_data>WO 383719</text_data><comment_date>2022-05-31T00:00:00</comment_date></row><row _id="row-fdmp_5jfg_e4bj" _uuid="00000000-0000-0000-0121-1B0B76C0BCE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fdmp_5jfg_e4bj"><intent_id>576924</intent_id><project_id>713920</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-07-25T00:00:00</comment_date></row><row _id="row-m6mq.95ie_cgdf" _uuid="00000000-0000-0000-D2AF-6C80D4B3AEF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6mq.95ie_cgdf"><intent_id>551025</intent_id><project_id>694283</project_id><text_data>Journeyman &amp; Foreman - Plumbers &amp; Pipefitter Fringe benefits: Health &amp; Welfare $8.36 - Vacation $5.50 - WA State Pension $4.56 - Supplemental Pension $3.25 - National Pension Fund 3.23 - JATC - $1.38 - Assessment Check Off $1.10 - Industry Improvement Trust $0.43 - International Training Fund $0.10 - MCAWW Dues $0.10</text_data><comment_date>2013-01-08T00:00:00</comment_date></row><row _id="row-bkbq~4kkr.tn8u" _uuid="00000000-0000-0000-73C1-D7F5C1E36437" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bkbq~4kkr.tn8u"><intent_id>934278</intent_id><project_id>861417</project_id><text_data>3005 Castlevale Road Yakima, WA 98902</text_data><comment_date>2018-09-20T00:00:00</comment_date></row><row _id="row-niei-xryb_ciss" _uuid="00000000-0000-0000-628A-71B3CB31FDC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-niei-xryb_ciss"><intent_id>782272</intent_id><project_id>798481</project_id><text_data>1. Install bath fan2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. No</text_data><comment_date>2016-08-15T00:00:00</comment_date></row><row _id="row-jev4-6xd6~9pad" _uuid="00000000-0000-0000-D2CE-D113A8D2F721" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jev4-6xd6~9pad"><intent_id>710051</intent_id><project_id>768330</project_id><text_data>Terminate outside building fiber optic cable within tunnel system to serve inside data system stations.</text_data><comment_date>2015-07-27T00:00:00</comment_date></row><row _id="row-a5us_36hn_wuqa" _uuid="00000000-0000-0000-4702-6B27C4ED320C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5us_36hn_wuqa"><intent_id>757802</intent_id><project_id>777514</project_id><text_data>Filed by Don Martin</text_data><comment_date>2016-04-21T00:00:00</comment_date></row><row _id="row-qjr2-jk6v.dacu" _uuid="00000000-0000-0000-7DF1-8F29A19B9463" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qjr2-jk6v.dacu"><intent_id>723882</intent_id><project_id>770434</project_id><text_data>The Telecommunications Technicians will be installing voice and data network cabling.</text_data><comment_date>2015-10-07T00:00:00</comment_date></row><row _id="row-jnpm.ewsg~n5a5" _uuid="00000000-0000-0000-38D7-4C8081CC4D6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jnpm.ewsg~n5a5"><intent_id>786051</intent_id><project_id>765837</project_id><text_data>Labor Ready is a temporary labor service provider and is therefore exempt from the requirement to obtain a contractors license.</text_data><comment_date>2016-08-30T00:00:00</comment_date></row><row _id="row-i2jc_cm6a_pg3s" _uuid="00000000-0000-0000-A602-7427A048B816" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i2jc_cm6a_pg3s"><intent_id>1234168</intent_id><project_id>970292</project_id><text_data>PROJECT#519974</text_data><comment_date>2022-05-17T00:00:00</comment_date></row><row _id="row-x7fh-zg6s~3y78" _uuid="00000000-0000-0000-234D-BB42A1854DD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x7fh-zg6s~3y78"><intent_id>1091202</intent_id><project_id>852196</project_id><text_data>Phase 3B</text_data><comment_date>2020-09-28T00:00:00</comment_date></row><row _id="row-q8yr~j3u8_8chp" _uuid="00000000-0000-0000-BEED-819CAECB38F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q8yr~j3u8_8chp"><intent_id>863050</intent_id><project_id>832720</project_id><text_data>3000314</text_data><comment_date>2017-09-15T00:00:00</comment_date></row><row _id="row-uwy5~xpyf-43q9" _uuid="00000000-0000-0000-B69E-B87181601B26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uwy5~xpyf-43q9"><intent_id>1070979</intent_id><project_id>924887</project_id><text_data>Evaluation Repairs to the site:Replacement of 8 damaged headsReplacement of 12 Clogged NozzlesReplacement of 6 Worn out rotorsRepairing 1 broken lateral line pipeRe Setting 5 heads for proper coverage</text_data><comment_date>2020-07-09T00:00:00</comment_date></row><row _id="row-7cki.6df3~nwvz" _uuid="00000000-0000-0000-BB44-B57E7BFC640C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7cki.6df3~nwvz"><intent_id>755991</intent_id><project_id>787832</project_id><text_data>Project is Sewer revision with road widening including paving, striping and signing.  Our work is Installation of Traffic Signs and Striping.  Guardrail Laborer class will be for the installation of the Traffic Signs, duties are to dig holes and place sign posts and bases and erect signs.  Tools used will be the following:   porta band � powered by a small generator,  small hand tools (wrenches, screw drivers, pliars, etc.), shovels and post hole diggers.  Driving a pickup to haul sign material and small tools.</text_data><comment_date>2016-04-13T00:00:00</comment_date></row><row _id="row-ncz7-8i23_xksx" _uuid="00000000-0000-0000-59B7-EDE4982BA353" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ncz7-8i23_xksx"><intent_id>576374</intent_id><project_id>713699</project_id><text_data>The two workers will be part-time workers</text_data><comment_date>2013-06-19T00:00:00</comment_date></row><row _id="row-h38q_dqcx.58ki" _uuid="00000000-0000-0000-44B4-4023F9272FF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h38q_dqcx.58ki"><intent_id>809091</intent_id><project_id>810264</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2017-01-19T00:00:00</comment_date></row><row _id="row-cxwb.yb4k~32fs" _uuid="00000000-0000-0000-1EB7-0A2E0B8BDF81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cxwb.yb4k~32fs"><intent_id>953315</intent_id><project_id>863072</project_id><text_data>FIRE ALARM CABLE &amp; CONTROLS, CONTROL RELAYS AND SILENT NIGHT ALL INDOORS</text_data><comment_date>2019-01-03T00:00:00</comment_date></row><row _id="row-ty9g_vzaa~kyvh" _uuid="00000000-0000-0000-7D2C-A72AB2C3F850" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ty9g_vzaa~kyvh"><intent_id>1029163</intent_id><project_id>903198</project_id><text_data>Panel ReplacementSingle family dwelling2livingnonoyesnononononononononononono</text_data><comment_date>2019-12-30T00:00:00</comment_date></row><row _id="row-4r5s~g7pe~zx3j" _uuid="00000000-0000-0000-DA60-A694E5E2AE1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4r5s~g7pe~zx3j"><intent_id>914335</intent_id><project_id>852526</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2018-06-27T00:00:00</comment_date></row><row _id="row-vnhq~gacs~nx2u" _uuid="00000000-0000-0000-B53E-59EEDE79D0C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vnhq~gacs~nx2u"><intent_id>1164855</intent_id><project_id>972964</project_id><text_data>COB City Hall green roof maint - set PO, not T&amp;MPer Lee RobertsonWO #80809 weed green roof bed</text_data><comment_date>2021-07-29T00:00:00</comment_date></row><row _id="row-ni78-dr44.rjj2" _uuid="00000000-0000-0000-456C-1D3582B0992F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ni78-dr44.rjj2"><intent_id>854337</intent_id><project_id>827641</project_id><text_data>From: Candice Bellamy [mailto:CandiceB@corlissresources.com] Sent: Monday, October 16, 2017 3:27 PMTo: LNI RE Prevailing Wage Worker 1 &amp;lt;PW1@LNI.WA.GOV&amp;gt;Subject: Valli Kee Apartments-Site Improvements Phase 2Good Afternoon,The prime of the above mentioned job is requesting that we add the sample verbiage to our intent #854337 and gave me this email to request it. Can you please add this verbiage to our intent or tell me how to do it. It needs to say � Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts /trades/occupations. Thanks, Candice BellamyHuman Resources GeneralistCorliss Resources INCTel: 253-826-8021Fax: 253-648-9503www.corlissresources.com</text_data><comment_date>2017-10-17T00:00:00</comment_date></row><row _id="row-i25r-jujm-p5mb" _uuid="00000000-0000-0000-D665-638CA1AD8821" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i25r-jujm-p5mb"><intent_id>929336</intent_id><project_id>851024</project_id><text_data>Installation of (6) Cat6 data locations, (4)Ea. for security cameras and (2)Ea. card readers</text_data><comment_date>2018-08-29T00:00:00</comment_date></row><row _id="row-xdqy~8y35-9r5x" _uuid="00000000-0000-0000-B9DF-355669C5589E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdqy~8y35-9r5x"><intent_id>863972</intent_id><project_id>829353</project_id><text_data>This project is exempt from the payment of state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101, and have stated that they will pay the workers properly in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2017-09-21T00:00:00</comment_date></row><row _id="row-smt6.sdbt-kbyg" _uuid="00000000-0000-0000-7F59-2D9E392C516A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-smt6.sdbt-kbyg"><intent_id>537647</intent_id><project_id>697066</project_id><text_data>We also had: Traffic Control Laborers, wage at 37.01, 7 workers</text_data><comment_date>2012-10-02T00:00:00</comment_date></row><row _id="row-r4ee_8rcy-xtzc" _uuid="00000000-0000-0000-6E74-DDF41C12144A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r4ee_8rcy-xtzc"><intent_id>1258506</intent_id><project_id>1026761</project_id><text_data>Owner operator excavatorEmployee used hand shovel, rake, broom</text_data><comment_date>2022-08-16T00:00:00</comment_date></row><row _id="row-gr9h-vth5-uqmw" _uuid="00000000-0000-0000-2C72-8E8FF4D37ABE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gr9h-vth5-uqmw"><intent_id>919263</intent_id><project_id>856313</project_id><text_data>Filed by R.T. Vatne</text_data><comment_date>2018-07-19T00:00:00</comment_date></row><row _id="row-uufs.93vm-smsc" _uuid="00000000-0000-0000-E61F-C62F1817CCD3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uufs.93vm-smsc"><intent_id>751155</intent_id><project_id>787114</project_id><text_data>From: Ziegert, Charles O (LNI) Sent: Thursday, March 17, 2016 6:16 AMTo: &amp;#39;corey@barkking.com&amp;#39;Subject: Citywide Bark &amp; Playchip Installations ProjectGood morning,Your Intent 751155 for this project has been approved.On-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.aspThank you,Chuck ZiegertIndustrial Relations AgentCharles.Ziegert@lni.wa.govPrevailing WageDept of Labor and IndustriesPhone 360 902-4538Prevailing Wage 360 902-5335Prevailing Wage Information:http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp**Answers contained in this e-mail are based on the facts you provided. If the facts differ from those you provided, the answers may be different.**</text_data><comment_date>2016-03-17T00:00:00</comment_date></row><row _id="row-ydrm-qvtb_bhbn" _uuid="00000000-0000-0000-95AD-A1F564F63EA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ydrm-qvtb_bhbn"><intent_id>809503</intent_id><project_id>810451</project_id><text_data>This is being filed to replace original intent number 737885.</text_data><comment_date>2017-01-03T00:00:00</comment_date></row><row _id="row-ei2i.xwrt~5vbu" _uuid="00000000-0000-0000-B38E-0C621B086491" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ei2i.xwrt~5vbu"><intent_id>977539</intent_id><project_id>881001</project_id><text_data>Pinard - 6127 Azure Way</text_data><comment_date>2019-05-13T00:00:00</comment_date></row><row _id="row-u7dc_3bn8-9wa5" _uuid="00000000-0000-0000-D361-ADD31CA0FAF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u7dc_3bn8-9wa5"><intent_id>1271704</intent_id><project_id>1033785</project_id><text_data>SC  220815-0111</text_data><comment_date>2022-10-04T00:00:00</comment_date></row><row _id="row-irct.5dc2.7pin" _uuid="00000000-0000-0000-57F6-FBB341BBB2F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-irct.5dc2.7pin"><intent_id>878897</intent_id><project_id>823254</project_id><text_data>HIRED BY SUB TYEE CONCRETE CONSTRUCTION</text_data><comment_date>2017-12-13T00:00:00</comment_date></row><row _id="row-3iex-d84x.87v4" _uuid="00000000-0000-0000-209C-1A7BFD4BB5F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3iex-d84x.87v4"><intent_id>1016030</intent_id><project_id>896439</project_id><text_data>SR# 43407976</text_data><comment_date>2019-10-17T00:00:00</comment_date></row><row _id="row-gz2a.uwb3~s58k" _uuid="00000000-0000-0000-3E85-146F161E8FC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gz2a.uwb3~s58k"><intent_id>464634</intent_id><project_id>669600</project_id><text_data>None</text_data><comment_date>2011-07-07T00:00:00</comment_date></row><row _id="row-c568~m2zf-pe9q" _uuid="00000000-0000-0000-AFAA-28639CD06D0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c568~m2zf-pe9q"><intent_id>1214733</intent_id><project_id>1001541</project_id><text_data>1.     Install DHP 2. Y 3. 1 4. residence a.n b. n c. y d.n e. n f. n g. n h. n i. n j. n k. n l. n 5. y 6. y 7. n 8 n</text_data><comment_date>2022-03-01T00:00:00</comment_date></row><row _id="row-5949_n7v4~5q23" _uuid="00000000-0000-0000-3E62-CB788083A0EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5949_n7v4~5q23"><intent_id>968332</intent_id><project_id>873268</project_id><text_data>Perform passive testing and PM, small hand tools and laptop.</text_data><comment_date>2019-03-29T00:00:00</comment_date></row><row _id="row-dpsi~zrpu-uc5u" _uuid="00000000-0000-0000-A7DB-ACAEF948496C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpsi~zrpu-uc5u"><intent_id>1109421</intent_id><project_id>943291</project_id><text_data>WORK FOR KEVINN HUSEMANN  @176TH PL SE</text_data><comment_date>2020-12-11T00:00:00</comment_date></row><row _id="row-9eek.jnzx~fubw" _uuid="00000000-0000-0000-0F07-AB4F0384CF8D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9eek.jnzx~fubw"><intent_id>1258423</intent_id><project_id>1026706</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations: CarpenterThe entire Scope of Work for this project will be performed by subcontractors. There is currently no Scope of Work that any Burton Construction, Inc employees will perform, but in the unlikely event that we will have to use any of our employees on the project, I have selected to add the General Carpenter trade. If I choose �no employees� while filing my Intent, and we end up having to use one, I will then have to refile my Intent and all of my subs will have to, as well. I have chosen to do it this way based on the recommendation of an L&amp;I PWIA representative. BCI Project No. PE2028Filed by Kathi Clark</text_data><comment_date>2022-08-16T00:00:00</comment_date></row><row _id="row-xuhp~2d5c.8m3u" _uuid="00000000-0000-0000-FEE3-698F73BA5643" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xuhp~2d5c.8m3u"><intent_id>556038</intent_id><project_id>703871</project_id><text_data>Form filed by: Dila Lim</text_data><comment_date>2013-02-13T00:00:00</comment_date></row><row _id="row-ezpz~h38r_q2yu" _uuid="00000000-0000-0000-B26E-EEA127A31B73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezpz~h38r_q2yu"><intent_id>970343</intent_id><project_id>877891</project_id><text_data>$6.24 Fringe:  Enrolled employees for Medical/Health ProgramLaborer:  ShovelTruck and Trailer:  Mob Equipment</text_data><comment_date>2019-04-09T00:00:00</comment_date></row><row _id="row-9y8x-jbdg-cyh5" _uuid="00000000-0000-0000-1E7F-0E20EC23804B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9y8x-jbdg-cyh5"><intent_id>1243306</intent_id><project_id>1018765</project_id><text_data>9892118</text_data><comment_date>2022-06-22T00:00:00</comment_date></row><row _id="row-ubn5-4afy.s946" _uuid="00000000-0000-0000-5B62-DCC2AB456C2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ubn5-4afy.s946"><intent_id>964194</intent_id><project_id>848793</project_id><text_data>Skanska hired us</text_data><comment_date>2019-03-08T00:00:00</comment_date></row><row _id="row-bhv8_bw46-zzdi" _uuid="00000000-0000-0000-CA5A-2627AD6383BE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bhv8_bw46-zzdi"><intent_id>606982</intent_id><project_id>719941</project_id><text_data>labor only to place concrete</text_data><comment_date>2013-12-03T00:00:00</comment_date></row><row _id="row-6asw~ic4i_iajs" _uuid="00000000-0000-0000-C9EA-CB9B9F178D33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6asw~ic4i_iajs"><intent_id>954377</intent_id><project_id>859736</project_id><text_data>#1: Hookup Heat Pump#2: Single Family dwelling#3: single story home#4(a): no#4(b): no#4(c): yes#4(d): no#4(e): no#4(f): no#4(g): no#4(h): no#4(i): no#4(j): no#4(k): no#4(l): N/A#5: yes#6: yes#7: no#8: no</text_data><comment_date>2019-01-10T00:00:00</comment_date></row><row _id="row-8spj_dxkt~t595" _uuid="00000000-0000-0000-F07C-3E60DC05AB16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8spj_dxkt~t595"><intent_id>1510207</intent_id><project_id>1170880</project_id><text_data>PO# 839366</text_data><comment_date>2025-02-16T00:00:00</comment_date></row><row _id="row-suzb.an5w_jyky" _uuid="00000000-0000-0000-616D-5A2D1E909D2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-suzb.an5w_jyky"><intent_id>1510212</intent_id><project_id>1170883</project_id><text_data>PO# 839375</text_data><comment_date>2025-02-16T00:00:00</comment_date></row><row _id="row-t26s.q2jq-ba7f" _uuid="00000000-0000-0000-DEC3-CE78484EADB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t26s.q2jq-ba7f"><intent_id>1521655</intent_id><project_id>1177810</project_id><text_data>DWS PVW REF# WA-959</text_data><comment_date>2025-03-27T00:00:00</comment_date></row><row _id="row-uqee~nxah~neqz" _uuid="00000000-0000-0000-65AB-5986113B460A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uqee~nxah~neqz"><intent_id>811669</intent_id><project_id>798861</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Install and Finish Drywall#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment#3 - Including any basement or garage, how many stories or levels does the structure have? 3#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Dormitories? NO(i) Counseling? NO(j) Is each room and/or bed in the structure rented separately? YES(k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom?  YES#7 - Is there a community facility or manager�s office on site? YES#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2017-01-18T00:00:00</comment_date></row><row _id="row-rkcy_tetu~g5gd" _uuid="00000000-0000-0000-3A0E-61E91576705B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rkcy_tetu~g5gd"><intent_id>712314</intent_id><project_id>768490</project_id><text_data>152081 - Audubon School Wall Repairs</text_data><comment_date>2015-08-05T00:00:00</comment_date></row><row _id="row-rwh9~tw7y~nr8r" _uuid="00000000-0000-0000-92C7-A5AE3440E07A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rwh9~tw7y~nr8r"><intent_id>556191</intent_id><project_id>704909</project_id><text_data>1.) We are working on a data communications system by hanging wireless access points on the ceiling grid tiles and then connecting Cat5e cable to the wireless access points. The goal of the project is an indoor wireless data communications network.</text_data><comment_date>2013-02-20T00:00:00</comment_date></row><row _id="row-69az-ifv7_8a3e" _uuid="00000000-0000-0000-788E-B16646F70385" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-69az-ifv7_8a3e"><intent_id>835289</intent_id><project_id>822264</project_id><text_data>We had a change in UBI #&amp;#39;s 6/1/2016 - 12/31/2016 is covered under Intent #767121 / Affidavit #715940</text_data><comment_date>2017-05-19T00:00:00</comment_date></row><row _id="row-5bqk-ms3k_9ar9" _uuid="00000000-0000-0000-BA09-F99D1756AE75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bqk-ms3k_9ar9"><intent_id>619021</intent_id><project_id>730370</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-03-10T00:00:00</comment_date></row><row _id="row-g94q-9chv.gm9m" _uuid="00000000-0000-0000-28D3-BE5F5C9A8E77" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g94q-9chv.gm9m"><intent_id>1077728</intent_id><project_id>927937</project_id><text_data>Yakima County Annex # 86843469 / 47502974</text_data><comment_date>2020-08-04T00:00:00</comment_date></row><row _id="row-ytbd~dd63~wsp8" _uuid="00000000-0000-0000-FAC9-4FD9FFA1EE31" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ytbd~dd63~wsp8"><intent_id>1021999</intent_id><project_id>899650</project_id><text_data>Artech Technicians to relocate (2) small sculpture artworks within Pier offices using hand truck / dolly and commercial bins. Artworks are to be replaced on bases by hand, vitrines slide into place by hand. No additional hardware or tools required.</text_data><comment_date>2019-11-15T00:00:00</comment_date></row><row _id="row-8r48.pstk_pvww" _uuid="00000000-0000-0000-5C14-0F6AC259309C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8r48.pstk_pvww"><intent_id>643695</intent_id><project_id>737564</project_id><text_data>Owner Operated</text_data><comment_date>2014-07-25T00:00:00</comment_date></row><row _id="row-8rcf.k2ge.kj66" _uuid="00000000-0000-0000-0905-FC4391D8F9ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8rcf.k2ge.kj66"><intent_id>942141</intent_id><project_id>850162</project_id><text_data>pellco hired us</text_data><comment_date>2018-10-26T00:00:00</comment_date></row><row _id="row-ic49~dqev_qmdb" _uuid="00000000-0000-0000-BC02-48BF29800D0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ic49~dqev_qmdb"><intent_id>1213444</intent_id><project_id>1000709</project_id><text_data>9886678</text_data><comment_date>2022-02-23T00:00:00</comment_date></row><row _id="row-tgvy~q3nw-tvau" _uuid="00000000-0000-0000-D758-11A23845DFF1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tgvy~q3nw-tvau"><intent_id>1183334</intent_id><project_id>969590</project_id><comment_date>2021-11-04T00:00:00</comment_date></row><row _id="row-ipts_n897-ncc8" _uuid="00000000-0000-0000-1899-8F4A8123CD88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ipts_n897-ncc8"><intent_id>1237345</intent_id><project_id>1015458</project_id><text_data>9891369</text_data><comment_date>2022-05-31T00:00:00</comment_date></row><row _id="row-4gkt-tnuh.3py7" _uuid="00000000-0000-0000-5A13-0D1A2186BC4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4gkt-tnuh.3py7"><intent_id>502372</intent_id><project_id>683260</project_id><text_data>Invoice 424641</text_data><comment_date>2012-03-01T00:00:00</comment_date></row><row _id="row-x6at-8e9w-t6dc" _uuid="00000000-0000-0000-6C11-A158060ED8F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x6at-8e9w-t6dc"><intent_id>819838</intent_id><project_id>815224</project_id><text_data>Duties performed by Millwright: Repair broken base on grapple (also referred to as a grisly). Install gussets, Grind/weld cracks. Tools: Gas welder, grinder.</text_data><comment_date>2017-03-15T00:00:00</comment_date></row><row _id="row-7wrq~bb4d_zk7v" _uuid="00000000-0000-0000-F703-F50BE9AEA6B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7wrq~bb4d_zk7v"><intent_id>673038</intent_id><project_id>752318</project_id><text_data>Several manufactured homes within the City of Vashon		#1 - Install Floor Insulation #2 - Single family manufactured home #3 - 1 level #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2015-01-11T00:00:00</comment_date></row><row _id="row-gfru~x28u~6h6w" _uuid="00000000-0000-0000-0907-49C57C2032C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gfru~x28u~6h6w"><intent_id>643541</intent_id><project_id>739327</project_id><text_data>Landscape Irrigation System Removal replacement and repair</text_data><comment_date>2014-07-25T00:00:00</comment_date></row><row _id="row-sjv3~w39j.2i9r" _uuid="00000000-0000-0000-F6AD-0A7E0107B3E9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sjv3~w39j.2i9r"><intent_id>1042666</intent_id><project_id>910894</project_id><text_data>Landscape maintenance - mow, blow, weed, mulch and pruning</text_data><comment_date>2020-03-03T00:00:00</comment_date></row><row _id="row-meib_gasb~aw99" _uuid="00000000-0000-0000-71C2-E216AD3DD818" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-meib_gasb~aw99"><intent_id>1191039</intent_id><project_id>907084</project_id><text_data>#1 Water Mitigation#2 Residential#3 2#4 a no#4 b no#4 c yes#4 d no#4 e no#4 f no#4 g no#4 h no#4 i no#4 j no#4 k no#5 no#6 no#7 no#8 no</text_data><comment_date>2021-11-04T00:00:00</comment_date></row><row _id="row-efd5.b5n4-8b23" _uuid="00000000-0000-0000-607F-64D21DCF631F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-efd5.b5n4-8b23"><intent_id>1199168</intent_id><project_id>991703</project_id><text_data>Haz Waste workers to transfer materials into another tanker using 75hp pump and to clear/clean area around tanker using shovels/rakes/sorbent pads</text_data><comment_date>2021-12-14T00:00:00</comment_date></row><row _id="row-q924_7mz5~n95k" _uuid="00000000-0000-0000-59C0-AC47AC4046F5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q924_7mz5~n95k"><intent_id>604982</intent_id><project_id>704591</project_id><text_data>We are working as a subcontractor to a landscape company on this landscaping project. We will be installing compost or bark mulch as a topdressing to finish off the landscaped beds and our work falls under the landscape beautification category. Our laborers are responsible for backpack blower cleanup and will be paid according to the rates published for landscaping and planting laborer. The operator of the blower truck will be paid according to the oil distribution / mulch distribution power equipment operator category. Please approve this intent as filed. Thank you for your assistance.</text_data><comment_date>2013-11-18T00:00:00</comment_date></row><row _id="row-7mny~tyyz.ycge" _uuid="00000000-0000-0000-89A2-90A8F51ACE99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7mny~tyyz.ycge"><intent_id>790961</intent_id><project_id>803088</project_id><text_data>Filed Dale Parks</text_data><comment_date>2016-09-21T00:00:00</comment_date></row><row _id="row-fikz.m965~632y" _uuid="00000000-0000-0000-7949-BCE5734CDB82" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fikz.m965~632y"><intent_id>486617</intent_id><project_id>668477</project_id><text_data>INDUSTRIAL INSURANCE # = 100,513-07</text_data><comment_date>2011-11-03T00:00:00</comment_date></row><row _id="row-ns23.kcu3_cxde" _uuid="00000000-0000-0000-14C3-B64D7757255C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ns23.kcu3_cxde"><intent_id>584878</intent_id><project_id>716757</project_id><text_data>Fungicide injection and deep root fertilization administered from a spray truck.</text_data><comment_date>2013-08-01T00:00:00</comment_date></row><row _id="row-7z9w_f4tc_jf6r" _uuid="00000000-0000-0000-A28A-9FBE592E3EC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7z9w_f4tc_jf6r"><intent_id>693425</intent_id><project_id>760325</project_id><text_data>Install Insulation, Single Family, Single Story, No, No, Yes, No, No, No, No, No, No, No, No, Yes, Yes, No, No</text_data><comment_date>2015-05-08T00:00:00</comment_date></row><row _id="row-fjew-a7bz-d6ne" _uuid="00000000-0000-0000-562A-2F11627C3C23" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fjew-a7bz-d6ne"><intent_id>898012</intent_id><project_id>848071</project_id><text_data>GENERAL LABORERS WILL BE USING RAKES AND SHOVELS TO SPREAD MATERIALS AND PERFORM CLEAN UP DUTIES</text_data><comment_date>2018-04-11T00:00:00</comment_date></row><row _id="row-6ee7_jxqj_4m6y" _uuid="00000000-0000-0000-C653-A702BD298D0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ee7_jxqj_4m6y"><intent_id>1159784</intent_id><project_id>968431</project_id><text_data>0421125</text_data><comment_date>2021-07-13T00:00:00</comment_date></row><row _id="row-8yeq.bcyp~pg9t" _uuid="00000000-0000-0000-A670-EE60855C3B03" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8yeq.bcyp~pg9t"><intent_id>1208869</intent_id><project_id>989985</project_id><text_data>All Fringe Benefits paid to Electrical Trust Funds IBEW Local 48 on a monthly basis per the collective bargaining agreement:National Electrical Benefit Fund - $1.62Edison Pension - $9.109th District - $5.02Health &amp; Welfare - $10.00Flex Plan - $1.30Training - $.80Barnes allison Labor Management Cooperation Committee - $.20Administration Fund - $.27</text_data><comment_date>2022-02-23T00:00:00</comment_date></row><row _id="row-6x8t~kv3e-xjp2" _uuid="00000000-0000-0000-AF21-812C9EC0B957" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6x8t~kv3e-xjp2"><intent_id>994928</intent_id><project_id>888397</project_id><text_data>38154</text_data><comment_date>2019-07-26T00:00:00</comment_date></row><row _id="row-63gr_wief-g27u" _uuid="00000000-0000-0000-9D22-086855199F85" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-63gr_wief-g27u"><intent_id>1070286</intent_id><project_id>910695</project_id><text_data>OUR WORK IS TO INCLUDE PLANTING OF GROUNDCOVER, PLACING TOPSOIL  AND BARKING FOR BEAUTIFICATION OF PROJECT. IRRIGATION RESTORATION. LANDSCAPE MAINTENANCE TO INCLUDE WEEDING RAKING OF BARK AND REPLACEMENT OF DEAD PLANT MATERIAL DURING WARRANTY PERIOD.</text_data><comment_date>2020-07-07T00:00:00</comment_date></row><row _id="row-r7zd_ukqk-iev8" _uuid="00000000-0000-0000-A0B3-39E9BA1C7120" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r7zd_ukqk-iev8"><intent_id>750266</intent_id><project_id>765342</project_id><text_data>General Laborer - Unloading materials for jobTruck Driver Other Trucks - 3/4 ton Dodge company work truck</text_data><comment_date>2016-03-08T00:00:00</comment_date></row><row _id="row-ye72.iiwf~ptbi" _uuid="00000000-0000-0000-85BB-DE751CAB5BA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ye72.iiwf~ptbi"><intent_id>761770</intent_id><project_id>791849</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT SITE.</text_data><comment_date>2016-05-12T00:00:00</comment_date></row><row _id="row-u2rp_m34h_g5ih" _uuid="00000000-0000-0000-4BC4-4F2597865D46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u2rp_m34h_g5ih"><intent_id>896564</intent_id><project_id>847436</project_id><text_data>Mar 1, 2018- Feb 28,2019 contract  Inspections performed 3/26,3/27,4/2/2018</text_data><comment_date>2018-04-03T00:00:00</comment_date></row><row _id="row-zps9~eqk4.tjxq" _uuid="00000000-0000-0000-359A-EBD4C6ABED7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zps9~eqk4.tjxq"><intent_id>684849</intent_id><project_id>756224</project_id><text_data>#1 interior painting #2 yes #3 1 #4 (a)no (b)no (c)yes (d)no (e)no (f)no (g)no (h)no (i)no (j)no (k)no #5 no #6 no #7 yes #8 yes</text_data><comment_date>2015-03-20T00:00:00</comment_date></row><row _id="row-fbyf~b69r~ddep" _uuid="00000000-0000-0000-7B2C-2BA99B16F410" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fbyf~b69r~ddep"><intent_id>1501766</intent_id><project_id>1165623</project_id><text_data>WO# 279097 COB Crossroads clean uprake leaves, hand weed, prune and re-bark</text_data><comment_date>2025-01-15T00:00:00</comment_date></row><row _id="row-5c2i-f6q8.wncx" _uuid="00000000-0000-0000-81C7-23C1AB13456C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5c2i-f6q8.wncx"><intent_id>1058111</intent_id><project_id>919032</project_id><text_data>Received a request for a technician to troubleshoot a projector not working on site. Need to test the cabling before they purchase a new projector. Also reporting the sound system is not working. Technician will test all cabling and connections to try and repair the issue. If it's the system itself, we will put together a quote to replace the system. Service work will be done and billed as time and material. If system replacement is needed that work will be quoted and completed as a bid.</text_data><comment_date>2020-05-14T00:00:00</comment_date></row><row _id="row-3j8v_rk87.ieet" _uuid="00000000-0000-0000-3F13-21E3FB9644DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3j8v_rk87.ieet"><intent_id>547906</intent_id><project_id>700660</project_id><text_data>Meyers, 820 N. Oak Harbor St. #4 Oak Harbor,WA.  invoice #373</text_data><comment_date>2012-12-10T00:00:00</comment_date></row><row _id="row-f4nn_zbtq-7afy" _uuid="00000000-0000-0000-63F3-BABFFADA489A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f4nn_zbtq-7afy"><intent_id>1169672</intent_id><project_id>944726</project_id><text_data>PPC #20579</text_data><comment_date>2021-08-17T00:00:00</comment_date></row><row _id="row-4ejm~naau-5uat" _uuid="00000000-0000-0000-5678-F4CA306C3E58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ejm~naau-5uat"><intent_id>971615</intent_id><project_id>878465</project_id><text_data>#1 � The crew will be installing a ductless heat pump, a new CO Detector an performing an electrical safety inspection#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2019-04-15T00:00:00</comment_date></row><row _id="row-wkei~ztd9-i9gu" _uuid="00000000-0000-0000-7582-156B3163364A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wkei~ztd9-i9gu"><intent_id>599957</intent_id><project_id>649039</project_id><text_data>From: Julie Scott [mailto:jscott@national-welding.com] Sent: Tuesday, October 22, 2013 8:13 AMTo: Mcdonnell, Elsa (LNI)Subject: Statement of Intent to Pay Prevailing WagesElsa, The following breakdown is the fridge benefits:   $7.55 Heath &amp; Security, $8.40 Pension, $0.70 Apprentice/Training and $.030 for Union Programs. Please let me know if you need any additional information. Thank You, Julie ScottNational Welding Corp.7025 Commerce Park DrMidvale, UT 84047Phone 801-255-5959Fax   801-255-5919</text_data><comment_date>2013-10-22T00:00:00</comment_date></row><row _id="row-y5yg~fa48-esgb" _uuid="00000000-0000-0000-9D42-D3C81F4A683B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5yg~fa48-esgb"><intent_id>790320</intent_id><project_id>760591</project_id><text_data>Filed by Andrey Tsvyan.This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2016-09-20T00:00:00</comment_date></row><row _id="row-x9by_qhh7~qcp3" _uuid="00000000-0000-0000-87E1-C9B51051A808" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x9by_qhh7~qcp3"><intent_id>470134</intent_id><project_id>671547</project_id><text_data>Prairie Electric, Inc.�s fringe packages only include Health Plan, Vacation Plan, Holiday Plan, Pension Plan, and Apprentice Program.</text_data><comment_date>2011-08-03T00:00:00</comment_date></row><row _id="row-q49y-tizc.jvem" _uuid="00000000-0000-0000-B05B-630621C26959" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q49y-tizc.jvem"><intent_id>1006902</intent_id><project_id>893158</project_id><text_data>General labor work consists of hand work (shovel work) no power equipment or power tools. Blade operator is used for grading the project site for compaction before paving operations. Other trucks consist of the following: 1) 0-8,000 gallon water truck used for watering the project site during the grading process. 2) oil distributor used for distribution of oil during the paving and/or chip sealing operations.</text_data><comment_date>2019-09-13T00:00:00</comment_date></row><row _id="row-34e6-wu7x_3wsa" _uuid="00000000-0000-0000-8774-3202D3F56D61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-34e6-wu7x_3wsa"><intent_id>1049211</intent_id><project_id>914532</project_id><text_data>We are installing bark into landscape beds. The owner will be performing the installation, while laborers perform cleanup with a leaf blower which falls under the landscape beautification classification. The laborers will be paid the published rate for Groundskeeper under Landscape Maintenance.</text_data><comment_date>2020-04-02T00:00:00</comment_date></row><row _id="row-2zje~za4t~a35k" _uuid="00000000-0000-0000-5336-41FD292A6C10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2zje~za4t~a35k"><intent_id>996145</intent_id><project_id>885602</project_id><text_data>0919048</text_data><comment_date>2019-07-31T00:00:00</comment_date></row><row _id="row-7q39.bp5m.bkkn" _uuid="00000000-0000-0000-C262-0E20F8E53F7A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7q39.bp5m.bkkn"><intent_id>887623</intent_id><project_id>843387</project_id><text_data>Contract 33915-Non Contract Customer/File affidavits when work requested/completed</text_data><comment_date>2018-02-09T00:00:00</comment_date></row><row _id="row-343r~j5iz-i6z7" _uuid="00000000-0000-0000-4D6D-41A006AF8FB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-343r~j5iz-i6z7"><intent_id>662839</intent_id><project_id>721313</project_id><text_data>Filed by Carla Stone.</text_data><comment_date>2014-10-28T00:00:00</comment_date></row><row _id="row-rh3u~xr3x-vk7m" _uuid="00000000-0000-0000-619A-9CACD94CBDF9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rh3u~xr3x-vk7m"><intent_id>667512</intent_id><project_id>741683</project_id><text_data>1. install bath fan 2. single family mobile home 3. 1 level 4a. no b. no c. yes d. no e. no f. no g. no h. no I. no j. k. no 5. yes 6. yes 7. no 8. no</text_data><comment_date>2014-11-25T00:00:00</comment_date></row><row _id="row-9q8n~32ns.wrgc" _uuid="00000000-0000-0000-C536-3D0D0E2C2EE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9q8n~32ns.wrgc"><intent_id>487629</intent_id><project_id>664855</project_id><text_data>hourly fringe breakdownpension - 1.61medical - 4.12vacation - .94holiday - .67</text_data><comment_date>2011-11-08T00:00:00</comment_date></row><row _id="row-vg59.2jkw_2qk3" _uuid="00000000-0000-0000-BEE4-027A7CE6383E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vg59.2jkw_2qk3"><intent_id>512623</intent_id><project_id>687919</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborer Union)Other Trucks - Lowbed (mobilization of equipment) Teamsters Union</text_data><comment_date>2012-05-18T00:00:00</comment_date></row><row _id="row-etxz-trf9_3wzr" _uuid="00000000-0000-0000-7D3D-4979D4A64A99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-etxz-trf9_3wzr"><intent_id>1021610</intent_id><project_id>898217</project_id><text_data>intent 301FNJ0640</text_data><comment_date>2019-11-14T00:00:00</comment_date></row><row _id="row-dwpj.j9m7~45kn" _uuid="00000000-0000-0000-9694-6303075E0593" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dwpj.j9m7~45kn"><intent_id>557220</intent_id><project_id>705400</project_id><text_data>NWC 3759</text_data><comment_date>2013-02-22T00:00:00</comment_date></row><row _id="row-zr8y_945b~xz7s" _uuid="00000000-0000-0000-34E5-A10F62B7EECE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zr8y_945b~xz7s"><intent_id>1163359</intent_id><project_id>955636</project_id><text_data>#1. Furnish and install carpet and vinyl sheet in floors#2. Apartment#3. 2#4. a) No., b) No., c) Yes., d) No., e) No., f) No., g) No., h) No. l) No., j) No., k) No., l) No.#5. Yes#6. Yes#7.Yes#8. No.</text_data><comment_date>2021-07-26T00:00:00</comment_date></row><row _id="row-zcya-b278~8sjd" _uuid="00000000-0000-0000-9194-3DC692D1DC20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zcya-b278~8sjd"><intent_id>1123000</intent_id><project_id>927129</project_id><text_data>Project # 20-10606</text_data><comment_date>2021-02-17T00:00:00</comment_date></row><row _id="row-z895_dpx4_93ia" _uuid="00000000-0000-0000-82BD-E49CBBF95127" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z895_dpx4_93ia"><intent_id>1362640</intent_id><project_id>1086668</project_id><text_data>42979, PROPOSAL FS05132, KVH PO P-1310</text_data><comment_date>2023-09-12T00:00:00</comment_date></row><row _id="row-bga6_bkpm-riwt" _uuid="00000000-0000-0000-20CD-D51AB7DBD1B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bga6_bkpm-riwt"><intent_id>683608</intent_id><project_id>756880</project_id><text_data>#1 - Electrical Remodel #2 - Single Family #3 - 1 or 2	 #4 - SFR  (a) - No  (b) - No  (c) - Yes  (d) - No  (e) - No  (f) - No #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2015-03-13T00:00:00</comment_date></row><row _id="row-bakw~jq5g~7mxe" _uuid="00000000-0000-0000-8CEF-F76DF34C9854" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bakw~jq5g~7mxe"><intent_id>696069</intent_id><project_id>759541</project_id><text_data>The Telecommunication Technician will be installing new CAT5e cable to existing parking lot signs.  This work will be outdoors.</text_data><comment_date>2015-05-22T00:00:00</comment_date></row><row _id="row-rz57.qr4w.fg36" _uuid="00000000-0000-0000-F21C-0CB5B881C18E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rz57.qr4w.fg36"><intent_id>1006486</intent_id><project_id>892980</project_id><text_data>Per your questions:  Tools:  Caulk gun,Foam Gun, Pressure diagnostic testing equip. Vehicle is a box truck.Duties:  while using diagnostic test equipment, seal areas identified using cauld, foam or other type of sealent to reduce air leakages.  Also use both pressue</text_data><comment_date>2019-10-07T00:00:00</comment_date></row><row _id="row-28de~9jgj-mh3a" _uuid="00000000-0000-0000-696E-2A600A19BBCA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-28de~9jgj-mh3a"><intent_id>852307</intent_id><project_id>829023</project_id><text_data>This job is to remove fire damaged trees at the STEM Academy in Bremerton. It will require 2 Faller bucker chainsaw operators and 1 brush hog feeder. There will be no crane or bucket truck used.</text_data><comment_date>2017-08-03T00:00:00</comment_date></row><row _id="row-qjtf_dfk6_ty87" _uuid="00000000-0000-0000-8F94-3341167B5661" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qjtf_dfk6_ty87"><intent_id>744462</intent_id><project_id>784044</project_id><text_data>sr34267484</text_data><comment_date>2016-02-02T00:00:00</comment_date></row><row _id="row-5vnm~bjjk_sji4" _uuid="00000000-0000-0000-D0B7-10433E762305" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5vnm~bjjk_sji4"><intent_id>573461</intent_id><project_id>712558</project_id><text_data>Job # 298619</text_data><comment_date>2013-06-05T00:00:00</comment_date></row><row _id="row-se9a.dfrg.5egd" _uuid="00000000-0000-0000-4853-35BE457AE87F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-se9a.dfrg.5egd"><intent_id>519063</intent_id><project_id>677196</project_id><text_data>Form filed by: Fred Wexler III</text_data><comment_date>2012-06-26T00:00:00</comment_date></row><row _id="row-scb9_894i~d43u" _uuid="00000000-0000-0000-4625-00CA87048A15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-scb9_894i~d43u"><intent_id>695840</intent_id><project_id>762843</project_id><text_data>1065C-39661</text_data><comment_date>2015-05-21T00:00:00</comment_date></row><row _id="row-hi8f-xd8n~ensm" _uuid="00000000-0000-0000-2D86-49C1DC80BE9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hi8f-xd8n~ensm"><intent_id>521448</intent_id><project_id>691293</project_id><text_data>Motor Patrol Grader non finishing would be smoothing sidewalk grade and shoulders prior to pouring concrete.</text_data><comment_date>2012-07-11T00:00:00</comment_date></row><row _id="row-zr9n~gqnw-uhzp" _uuid="00000000-0000-0000-D634-1CEF897616E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zr9n~gqnw-uhzp"><intent_id>1265914</intent_id><project_id>1030645</project_id><text_data>Project# 03941, Aguirre, Michael, 3705 S Sundown Dr, Spokane Valley, WA 99206</text_data><comment_date>2022-09-13T00:00:00</comment_date></row><row _id="row-q2rd.murv_7vc5" _uuid="00000000-0000-0000-F716-3CDB21A3EE95" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q2rd.murv_7vc5"><intent_id>1078416</intent_id><project_id>928232</project_id><text_data>Installed 50 gallon hot water heater.  2.  Yes  3.  Single  4.  a  N  b  N  c  Y  d  N  e  N  f  N  g  N  h  N  i  N  j  N  k  N  l  N  5  Y  6 Y  7  N  8  N.</text_data><comment_date>2020-08-06T00:00:00</comment_date></row><row _id="row-gqb9-kaaf-c324" _uuid="00000000-0000-0000-FAED-B5637B1DF692" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gqb9-kaaf-c324"><intent_id>524450</intent_id><project_id>689679</project_id><text_data>ANABERTA ALVARADO 300318-6381616 GORDON RD. #24YAKIMA, WA  98901</text_data><comment_date>2012-07-25T00:00:00</comment_date></row><row _id="row-eqjk.3k2t_3357" _uuid="00000000-0000-0000-CE70-5686AAC58AEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eqjk.3k2t_3357"><intent_id>958203</intent_id><project_id>872230</project_id><text_data>- Removal Done 11/29/17- Non Contract; re-file Intents &amp; Affidavits per job during period</text_data><comment_date>2019-01-31T00:00:00</comment_date></row><row _id="row-ym35_f8b4-d82c" _uuid="00000000-0000-0000-CC7C-6A99B88A1242" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ym35_f8b4-d82c"><intent_id>1094557</intent_id><project_id>919373</project_id><text_data>Overall Project Description: Removal of chain link fence, existing trees and vegetation, cut asphalt and dig footings for OFIO greenhouse installation at MVHS. Mountain View's Part:Remove trees, cut stumps as low as practical. Chip and remove all debris and wood.  Grind stumps to a depth of 8-10 inches in a 1-2 foot radius. Leave grinding debris in place. Equipment and Tools To Be Used:To perform the tree removals a bucket truck, chipper, and chainsaw would be used. To perform the stump grinding, a stump grinder would be used.</text_data><comment_date>2020-12-11T00:00:00</comment_date></row><row _id="row-r78n.6cw6_33ia" _uuid="00000000-0000-0000-122B-4EC2B48DEDCF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r78n.6cw6_33ia"><intent_id>1510666</intent_id><project_id>1171122</project_id><text_data>240931</text_data><comment_date>2025-02-18T00:00:00</comment_date></row><row _id="row-dfqe-ra74-sg6c" _uuid="00000000-0000-0000-0C14-C4AAB293E24C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dfqe-ra74-sg6c"><intent_id>851311</intent_id><project_id>828648</project_id><text_data>1)HVAC service, 2) Single Family Residence, 3) One level , 4) A)NO, B)NO, C)YES, D)NO, E)NO, F)NO, G)NO, H)NO, I)NO, J)NO, 5) one kitchen in residence, 6) one bathroom in home,  7) No, 8) No</text_data><comment_date>2017-07-31T00:00:00</comment_date></row><row _id="row-34t8_uiiz.99av" _uuid="00000000-0000-0000-3DB9-6A14787F03DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-34t8_uiiz.99av"><intent_id>788917</intent_id><project_id>800615</project_id><text_data>1. Ductless Heatpump2. Single family3. 14. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No5. Yes6. Yes7. No8. NoWinters Northcutt Tamayo Hidman Gonzalez Shelan</text_data><comment_date>2016-09-13T00:00:00</comment_date></row><row _id="row-btsw.bjmv.2dkm" _uuid="00000000-0000-0000-9204-94AD21DC63E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-btsw.bjmv.2dkm"><intent_id>622965</intent_id><project_id>727314</project_id><text_data>Work to be performed will be Aerating, Fertilizing, Slice Seeding and Top Dressing of athletic fields.Work will be performed with a 45 hp tractor pulling the aerator, spreaders and seeders.</text_data><comment_date>2014-04-02T00:00:00</comment_date></row><row _id="row-rifw-bfpz_yi3u" _uuid="00000000-0000-0000-A569-B7C946FA8D5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rifw-bfpz_yi3u"><intent_id>665925</intent_id><project_id>722094</project_id><text_data>Hydroseed -using a truck mounted hydroseeder- 82000 square ft. --after irrigation and prep work is completed by R&amp;L Landscape Construction .</text_data><comment_date>2014-11-17T00:00:00</comment_date></row><row _id="row-9uwj~w8de.rxrz" _uuid="00000000-0000-0000-6109-4E8D67DF8171" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9uwj~w8de.rxrz"><intent_id>1264681</intent_id><project_id>1026795</project_id><text_data>Breakdown of Fringe BenefitsCarpenters: Health and Welfare: $8.98, Pension: $10.10, Training: $.89, Substance Abuse Program: $.06, Millwright/Pile Driver First Industry Fund: $.05Laborers: Heath and Welfare: $7.55, Pension: $5.30, Training: $.95, NWLECET (Northwest Laborers-Employers Cooperation and Education Team): $.14, WCISAP (Washington Construction Industry Substance Abuse Program): $.06Operators: Heath and Welfare: $7.32, Pension: $16.40, Aprentice Training: $.75</text_data><comment_date>2022-09-07T00:00:00</comment_date></row><row _id="row-xccr.ucep~76iw" _uuid="00000000-0000-0000-9D70-520AB1A2B2EC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xccr.ucep~76iw"><intent_id>1217467</intent_id><project_id>1003351</project_id><text_data>9883200</text_data><comment_date>2022-03-14T00:00:00</comment_date></row><row _id="row-zcqg-2jtr.7gev" _uuid="00000000-0000-0000-C079-9508DF80C6A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zcqg-2jtr.7gev"><intent_id>794240</intent_id><project_id>804324</project_id><text_data>WO #8014981</text_data><comment_date>2016-10-06T00:00:00</comment_date></row><row _id="row-mbcp_k8ce.phr7" _uuid="00000000-0000-0000-3359-41741B305FED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbcp_k8ce.phr7"><intent_id>866221</intent_id><project_id>830808</project_id><text_data>To perform PM with basic hand-tools and meters.  We are manufacturer reps under e07 guidance.</text_data><comment_date>2017-09-30T00:00:00</comment_date></row><row _id="row-svn3_gmde-tnjc" _uuid="00000000-0000-0000-2A2D-98F2FA4534CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-svn3_gmde-tnjc"><intent_id>1270304</intent_id><project_id>1026912</project_id><text_data>aa job# 34968trucks - lowboy delivers asphalt rotomill to jobsite</text_data><comment_date>2022-09-28T00:00:00</comment_date></row><row _id="row-bymp-9zws-ici6" _uuid="00000000-0000-0000-B024-F7FE17CDA80A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bymp-9zws-ici6"><intent_id>912334</intent_id><project_id>852130</project_id><text_data>Active job# 18-011TRUCKSlowboy delivers asphalt rotomill to jobsitesweeper driven to jobsite</text_data><comment_date>2018-06-19T00:00:00</comment_date></row><row _id="row-snnm-iz72.pchk" _uuid="00000000-0000-0000-8B9F-1ADE7A918426" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-snnm-iz72.pchk"><intent_id>853544</intent_id><project_id>823254</project_id><text_data>Truck and pup hauling</text_data><comment_date>2017-08-08T00:00:00</comment_date></row><row _id="row-ja8g~k6g8_7y3s" _uuid="00000000-0000-0000-981F-038ED837C40D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ja8g~k6g8_7y3s"><intent_id>761276</intent_id><project_id>791637</project_id><text_data>Job Order Contract 2014 � Project # 204676 � University of Washington CCE # 73120-0077 � Contract No. 205472</text_data><comment_date>2016-05-10T00:00:00</comment_date></row><row _id="row-sx68_tgrx-7dx3" _uuid="00000000-0000-0000-C43A-99AF221A5737" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sx68_tgrx-7dx3"><intent_id>838948</intent_id><project_id>818717</project_id><text_data>HIRED BY CORNERSTONE GENERAL</text_data><comment_date>2017-06-07T00:00:00</comment_date></row><row _id="row-3rjn~3kpk_z67d" _uuid="00000000-0000-0000-C837-FE56B6DA10A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3rjn~3kpk_z67d"><intent_id>560014</intent_id><project_id>702627</project_id><text_data>1.	What was the purpose of the project? Provide software programming of the control of 2 new and 3 existing VAV Terminal Units (VAV-1 � 5) New Room humidity sensor for VAV-1 only. Control and amperage monitoring of the new exhaust fan EF-12. Control and status monitoring of the EF-12 isolation damper.2.	Does this project entail the remodeling or new construction of a facility? No3.	If your firm is working upon a type of building system, what type of system is involved? HVAC/ Refrigeration control system.4.	What specific tasks did your employees perform? Siemens� BAU Technicians perform their work strictly on laptop computers, both remotely and on-site during the commissioning process. While off-site the BAU Technicians create a computerized schematic of a particular buildings HVAC automations system. That system is used to control the systems functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly the BAU Technician trains the end-user about the automation system functionality again using a computer interface. Importantly, BAU Technicians do not use trade tools such as drills or wrenches. 5.	What if any tools did your employees use in the performance of those tasks? Laptop computer.6.	If your employee used no tools, did they engage in any other type of manual, hands on efforts in completing their tasks? No-none.7.	Are you going to be hiring Subcontractors? Yes</text_data><comment_date>2013-03-14T00:00:00</comment_date></row><row _id="row-ays5_3vwi~usjr" _uuid="00000000-0000-0000-E49A-D7EB25211972" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ays5_3vwi~usjr"><intent_id>676519</intent_id><project_id>742805</project_id><text_data>145105 Install 3 wireless access points. No cabling will be run, existing cabling shall be used.</text_data><comment_date>2015-01-27T00:00:00</comment_date></row><row _id="row-byw8-y6fp.fwpf" _uuid="00000000-0000-0000-ED12-B2F7EAD8CCFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-byw8-y6fp.fwpf"><intent_id>914244</intent_id><project_id>854198</project_id><text_data>Track Surface installation</text_data><comment_date>2018-06-27T00:00:00</comment_date></row><row _id="row-jq5d_9ugj.e7y3" _uuid="00000000-0000-0000-52BD-30570852FB0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jq5d_9ugj.e7y3"><intent_id>520685</intent_id><project_id>691033</project_id><text_data>2 Ton Truck used to haul misc materials to, from and on the job as needed, Non Finishing - Performing rough grade duties during road construction.</text_data><comment_date>2012-07-06T00:00:00</comment_date></row><row _id="row-sfey-yh2t~77af" _uuid="00000000-0000-0000-9973-450D58806113" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sfey-yh2t~77af"><intent_id>469889</intent_id><project_id>669933</project_id><text_data>Truck driver,  oil dispersement truck.  2001 kenworth 96,000 lbs, 4000 gal capacity</text_data><comment_date>2011-08-18T00:00:00</comment_date></row><row _id="row-pqb3.8352.bi2a" _uuid="00000000-0000-0000-2720-F4E5C50BF456" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqb3.8352.bi2a"><intent_id>729887</intent_id><project_id>771747</project_id><text_data>Filed by Dave Ankenbauer</text_data><comment_date>2015-11-04T00:00:00</comment_date></row><row _id="row-jgct~u5k8~fn5r" _uuid="00000000-0000-0000-B980-A22843A480E4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jgct~u5k8~fn5r"><intent_id>1145296</intent_id><project_id>937126</project_id><text_data>Sheetmetal Fringe Information: Nat. Pension $4.24   Union training t $0.17   NW Pension $9.50   Health/Veba/Ext/Veba/Rsf $12.77   Apprenticeship $1.10   Industry fund $0.65   Org. Trust Fund $1.00   NW Supplemental $0.79   Clean Card $0.07     Grand Total Fringe $30.29</text_data><comment_date>2021-05-23T00:00:00</comment_date></row><row _id="row-v44h_zhfx_gwhh" _uuid="00000000-0000-0000-20A4-2109D00CDC52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v44h_zhfx_gwhh"><intent_id>772285</intent_id><project_id>796006</project_id><text_data>Troubleshoot existing elpas system. Identify errors and repair if possible</text_data><comment_date>2016-07-01T00:00:00</comment_date></row><row _id="row-5k3x_ntue_cp2k" _uuid="00000000-0000-0000-3067-827CD807FB5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5k3x_ntue_cp2k"><intent_id>1179078</intent_id><project_id>976829</project_id><comment_date>2021-09-20T00:00:00</comment_date></row><row _id="row-53q5_wues~rmn6" _uuid="00000000-0000-0000-9F11-1FC5CEC27AC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-53q5_wues~rmn6"><intent_id>1058485</intent_id><project_id>844643</project_id><text_data>Contractor status was active at time work was performed.</text_data><comment_date>2022-02-09T00:00:00</comment_date></row><row _id="row-v22j_jngg.43k4" _uuid="00000000-0000-0000-9C18-23F88E944FAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v22j_jngg.43k4"><intent_id>497235</intent_id><project_id>666450</project_id><text_data>work performed was hydroseeding. All employees were from Oregon.</text_data><comment_date>2012-02-21T00:00:00</comment_date></row><row _id="row-t4yu-jg8v_bdaw" _uuid="00000000-0000-0000-9E3A-B86804E1ABD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t4yu-jg8v_bdaw"><intent_id>541172</intent_id><project_id>698321</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-10-29T00:00:00</comment_date></row><row _id="row-c8ea.uf3h.k3de" _uuid="00000000-0000-0000-BE6F-5127DF58C4E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c8ea.uf3h.k3de"><intent_id>1207631</intent_id><project_id>997203</project_id><text_data>During the construction phase of the project, Cornerstone's General Laborers will be performing tasks such as cleaning, prepping jobsites, material handling, and setting up temporary facilities.  No special tools will be required.</text_data><comment_date>2022-02-15T00:00:00</comment_date></row><row _id="row-zygc~frin~72hh" _uuid="00000000-0000-0000-0DD0-1260B8ED8476" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zygc~frin~72hh"><intent_id>979294</intent_id><project_id>881760</project_id><text_data>Filed by Eric Carabba</text_data><comment_date>2019-05-21T00:00:00</comment_date></row><row _id="row-qhf3.x9ww-cmsh" _uuid="00000000-0000-0000-4B72-FC13C92633B5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qhf3.x9ww-cmsh"><intent_id>1175840</intent_id><project_id>915525</project_id><text_data>Tymco 600 sweeper unit on a Freightliner or International chassis</text_data><comment_date>2021-09-08T00:00:00</comment_date></row><row _id="row-7t58-hwtw~7krj" _uuid="00000000-0000-0000-DDAF-CCC87370C645" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7t58-hwtw~7krj"><intent_id>1036632</intent_id><project_id>907398</project_id><text_data>9842932</text_data><comment_date>2020-02-06T00:00:00</comment_date></row><row _id="row-jggx~dmv7_3uz7" _uuid="00000000-0000-0000-DD74-996C986BE2F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jggx~dmv7_3uz7"><intent_id>485300</intent_id><project_id>676811</project_id><text_data>Landscape Maintenance - Weed Control-Weedeating, weed pulling, cutting blackberries,etc.</text_data><comment_date>2011-10-24T00:00:00</comment_date></row><row _id="row-tzg7.j5mt~xxne" _uuid="00000000-0000-0000-531C-5107691233D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tzg7.j5mt~xxne"><intent_id>643087</intent_id><project_id>740030</project_id><text_data>I have entered both Thurston and Pierce County as we are working in Thurston County but our fabrication is done here in Pierce County.  I need both Counties in case we make something here to use on the job.</text_data><comment_date>2014-07-24T00:00:00</comment_date></row><row _id="row-95k5~8zx3_h4zr" _uuid="00000000-0000-0000-7A8E-856FA28D7E15" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-95k5~8zx3_h4zr"><intent_id>1053232</intent_id><project_id>916625</project_id><text_data>Customer #33480, Contracts 37786,37787,37788,37789,37790Contract 3/1/2020 thru 2/28/2021</text_data><comment_date>2020-04-22T00:00:00</comment_date></row><row _id="row-kcan~fqvw_njaq" _uuid="00000000-0000-0000-0FBC-73DA2092CB31" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kcan~fqvw_njaq"><intent_id>724976</intent_id><project_id>774131</project_id><text_data>1) Intermountain West Insulation was hired to provide weatherization in the form of insulation for this single family home. 2) Single family home. 3) Single story. 4) a)No B)No C)Yes D-K)No 5)Yes 6)Yes 7)No 8) No</text_data><comment_date>2015-10-07T00:00:00</comment_date></row><row _id="row-nz9m~3zix~2ebc" _uuid="00000000-0000-0000-3EC4-53F39D50272F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nz9m~3zix~2ebc"><intent_id>653281</intent_id><project_id>704635</project_id><text_data>THIS INTENT IS FOR BID PACKAGE # 111</text_data><comment_date>2014-09-09T00:00:00</comment_date></row><row _id="row-wus5~vj46_xuq4" _uuid="00000000-0000-0000-18EC-7198BDECCDEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wus5~vj46_xuq4"><intent_id>1207221</intent_id><project_id>996952</project_id><text_data>94075/Franklin County Correction/Walk-in cooler</text_data><comment_date>2022-01-26T00:00:00</comment_date></row><row _id="row-y86t.3bsv-6e9w" _uuid="00000000-0000-0000-D33D-4B96249B44D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y86t.3bsv-6e9w"><intent_id>985248</intent_id><project_id>848015</project_id><text_data>street sweeper</text_data><comment_date>2019-06-17T00:00:00</comment_date></row><row _id="row-2c68~6kzb_nmhs" _uuid="00000000-0000-0000-88F3-3D1DF17CC718" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2c68~6kzb_nmhs"><intent_id>910472</intent_id><project_id>849326</project_id><text_data>&amp;quot;TRUCK DRIVER - OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER</text_data><comment_date>2018-06-12T00:00:00</comment_date></row><row _id="row-hjvg_uz5h~kk3c" _uuid="00000000-0000-0000-918A-37D7E0A7852E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hjvg_uz5h~kk3c"><intent_id>853634</intent_id><project_id>829516</project_id><text_data>On-Call telecommunications cabling indoors at various locations throughout airport as needed. All work will fall under WAC 296-127-01378. Exact Same work as performed on our intents 673395 &amp; 737960. This contract is for one year. 08/01/2017-08/01/2018</text_data><comment_date>2017-08-09T00:00:00</comment_date></row><row _id="row-tbw5-vipm~t3m8" _uuid="00000000-0000-0000-2575-095E805029B4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tbw5-vipm~t3m8"><intent_id>592287</intent_id><project_id>719446</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR DRIVER - WILL DRIVE ON THE PROJECT AND SPRAY THE ROAD WITH OIL/TACK PRIOR TO PLACING ASPHALT										OTHER TRUCKS - WATER TANK TRUCK - WILL SPRAY THE ROAD WITH WATER FOR DUST CONTROL</text_data><comment_date>2013-09-06T00:00:00</comment_date></row><row _id="row-2izc-5k4k~rak9" _uuid="00000000-0000-0000-BF07-C01B9526EBA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2izc-5k4k~rak9"><intent_id>560052</intent_id><project_id>698067</project_id><text_data>ICON Job #130032</text_data><comment_date>2013-03-14T00:00:00</comment_date></row><row _id="row-apyu-urw2~rydc" _uuid="00000000-0000-0000-8A1C-E6C0D8D17EB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-apyu-urw2~rydc"><intent_id>719172</intent_id><project_id>771764</project_id><text_data>Other Truck is a Water Truck</text_data><comment_date>2015-09-04T00:00:00</comment_date></row><row _id="row-xpvy.t8zc.gyem" _uuid="00000000-0000-0000-F10F-05F808731A52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xpvy.t8zc.gyem"><intent_id>893864</intent_id><project_id>846287</project_id><text_data>Town and Country Office Cleaning address change from 19910 52nd Pl. W., Lynnwood, WA 98036 to new address 215 153rd St. S.E., Lynnwood, WA 98087</text_data><comment_date>2018-03-20T00:00:00</comment_date></row><row _id="row-th3w~ye3r_tvz5" _uuid="00000000-0000-0000-F03F-783D34DA9744" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-th3w~ye3r_tvz5"><intent_id>811210</intent_id><project_id>811283</project_id><text_data>#1 Install 5 Cadet wall heaters in home. #2 Single family dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2017-01-14T00:00:00</comment_date></row><row _id="row-b9dn.dapx_6y9m" _uuid="00000000-0000-0000-CC0C-6F322B6DEB9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9dn.dapx_6y9m"><intent_id>1359813</intent_id><project_id>1045499</project_id><text_data>VE#18699</text_data><comment_date>2023-08-31T00:00:00</comment_date></row><row _id="row-sar4-zhf9~492k" _uuid="00000000-0000-0000-C0F0-EF738FD2C7C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sar4-zhf9~492k"><intent_id>1011663</intent_id><project_id>895041</project_id><text_data>1.Weatherize Unit2.Single Family Dwelling3. One Level4. a.no b.no c.yes d.no e.no f.no g.no h.noi.no j.no k.no l.no5.yes6.yes7.no8.no</text_data><comment_date>2019-10-02T00:00:00</comment_date></row><row _id="row-9iad~6cjv.qn9m" _uuid="00000000-0000-0000-E33E-0EB8C55DF4B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9iad~6cjv.qn9m"><intent_id>636207</intent_id><project_id>730951</project_id><text_data>there was no listing for power equipment operator crane 125 tonthere was no listing for an oiler for 125 ton crane</text_data><comment_date>2014-06-19T00:00:00</comment_date></row><row _id="row-ppcb.wus2.ebqr" _uuid="00000000-0000-0000-4E36-114F9E51C993" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ppcb.wus2.ebqr"><intent_id>845590</intent_id><project_id>791245</project_id><text_data>Filed by Igor Sysun</text_data><comment_date>2017-07-06T00:00:00</comment_date></row><row _id="row-kfmb_ddg6.ffke" _uuid="00000000-0000-0000-73DD-76B6BFA3E191" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kfmb_ddg6.ffke"><intent_id>1095930</intent_id><project_id>936280</project_id><text_data>Project consist of both state and federal funds</text_data><comment_date>2020-10-14T00:00:00</comment_date></row><row _id="row-kv7v~gtvg~tesa" _uuid="00000000-0000-0000-82F9-7DCDEEDB7F11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kv7v~gtvg~tesa"><intent_id>689072</intent_id><project_id>759980</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2015-04-16T00:00:00</comment_date></row><row _id="row-vj3w.p6u5.futc" _uuid="00000000-0000-0000-A4E8-15F00650F5B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vj3w.p6u5.futc"><intent_id>1147956</intent_id><project_id>959110</project_id><text_data>Sheet Metal Workers - Shop - Local 16 - Fringe: $7.04 Oregon Pension, $3.60 Pension Off Benefit, $2.74 National Pension, $7.48 Health Care, $1.00 HRA, $.05 Drug Testing, $1.03 Local Training, $.12 National Training, $.03 NEMIC, $.02 SMOHIT, $.57 Industry Fund.</text_data><comment_date>2021-06-30T00:00:00</comment_date></row><row _id="row-ecig-cf8s.aag5" _uuid="00000000-0000-0000-4060-CCE9070352C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ecig-cf8s.aag5"><intent_id>934030</intent_id><project_id>861892</project_id><text_data>COE - Trans Mtc - Training Room 2nd Floor - PO #PW-18141 - Replace w/New Mitsubishi R410a Ductless Split System.</text_data><comment_date>2018-09-19T00:00:00</comment_date></row><row _id="row-3j7j-zyzi~uy9z" _uuid="00000000-0000-0000-436D-866542545B56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3j7j-zyzi~uy9z"><intent_id>1024368</intent_id><project_id>885207</project_id><text_data>Job 799</text_data><comment_date>2019-11-30T00:00:00</comment_date></row><row _id="row-ffw9.bw32~9n95" _uuid="00000000-0000-0000-8FC0-E6ECB0F08771" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ffw9.bw32~9n95"><intent_id>908071</intent_id><project_id>852148</project_id><text_data>S027501</text_data><comment_date>2018-05-31T00:00:00</comment_date></row><row _id="row-5fxx_9rbj_xsns" _uuid="00000000-0000-0000-0006-AABCB2C6124E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fxx_9rbj_xsns"><intent_id>680838</intent_id><project_id>749336</project_id><text_data>As of April 29, 2015 no ironworkers have worked at the Project Site for this job. This is scheduled for a supply only project requiring Laborers and Welders only. County locations and classifications have been adjusted as requested to county in which work is applicable. All employee pay rates are higher than the required rate for this Intent.</text_data><comment_date>2015-04-29T00:00:00</comment_date></row><row _id="row-f3hf.ygtm-ie26" _uuid="00000000-0000-0000-9C50-1EF9C86AEA28" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f3hf.ygtm-ie26"><intent_id>942891</intent_id><project_id>859835</project_id><text_data>This is lawn care not construction</text_data><comment_date>2018-10-30T00:00:00</comment_date></row><row _id="row-dcck-gxd9-9cws" _uuid="00000000-0000-0000-F68D-C992DD0C9F3E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dcck-gxd9-9cws"><intent_id>524432</intent_id><project_id>690810</project_id><text_data>GENERAL LABORER:  PERFORMS FINAL CLEANUP AFTER THE CONSTRUCTION HAS BEEN COMPLETED.  TOOLS: SHOVELSTRK DRIVER/OTHER TRUCKS:  WE USE WATER TRUCKS WITH 4000 GAL OF WATER OR LESS.  THEY ARE USED FOR DUST CONTROL</text_data><comment_date>2012-07-25T00:00:00</comment_date></row><row _id="row-2qz4~bvwz_p4tv" _uuid="00000000-0000-0000-61EA-9E6B4C0D0826" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2qz4~bvwz_p4tv"><intent_id>816681</intent_id><project_id>813774</project_id><text_data>This was an emergency hazard tree job.  One of the main arms of the tree broke off narrowing missing a home.  The remaining tree was deemed hazardous by the city arborist.  We took the tree down using a bucket truck and had the debris removed by Sharps Trucking of Olympia. Myself and one employee handled the job.</text_data><comment_date>2017-02-19T00:00:00</comment_date></row><row _id="row-cuq7-ehms_m9qc" _uuid="00000000-0000-0000-3A9A-350C7024F499" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cuq7-ehms_m9qc"><intent_id>838686</intent_id><project_id>823643</project_id><text_data>James Lewis Tyree II.</text_data><comment_date>2017-06-06T00:00:00</comment_date></row><row _id="row-4nep~5vmw-yv9k" _uuid="00000000-0000-0000-0413-E3767B2FC275" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4nep~5vmw-yv9k"><intent_id>755900</intent_id><project_id>789152</project_id><text_data>Russell Landscaping is responsible for installing approximately 280 yards of top soil where a 4&amp;quot; depth of top soil will be installed over 1415 square yards.  We will use our skidsteer and rakes to install top soil.  Area is to be graded in preparation for hydroseed. Russell Landscaping will hydroseed 1,415 square yards using our Bowie hydroseed machine.</text_data><comment_date>2016-04-11T00:00:00</comment_date></row><row _id="row-68p3~hiff-cy7m" _uuid="00000000-0000-0000-9E75-61A9677295DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-68p3~hiff-cy7m"><intent_id>551734</intent_id><project_id>702973</project_id><text_data>4612 N Evergreen Rd p.o D-107 Amt 3076.213920 E center Rd # 14 P.o A-120 Amt.3050.77612 N Armin P.o 378509 Amt 300.00</text_data><comment_date>2013-01-14T00:00:00</comment_date></row><row _id="row-5zgj_599v~4ns2" _uuid="00000000-0000-0000-2B4A-D6219F1E666C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5zgj_599v~4ns2"><intent_id>1161875</intent_id><project_id>971459</project_id><text_data>REPLACED HARD DRIVED ON DVR AT CMS</text_data><comment_date>2021-07-20T00:00:00</comment_date></row><row _id="row-5fxn~wq38~disk" _uuid="00000000-0000-0000-4BFF-F717D9F4BFF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fxn~wq38~disk"><intent_id>1287354</intent_id><project_id>1035215</project_id><text_data>Our company was subcontracted to provide building janitorial services including, Mopping and vacuuming in required areas: 1) mopping vinyl floor in kitchen, hallway and bedrooms 2)Vacuuming bathroom exhaust, air vent and fan covers etc. The following equipment and supplies will be used in the completion of this work:1) microfiber Mops, clothes and rags 2) back pack vacuums 3) steamers</text_data><comment_date>2022-12-02T00:00:00</comment_date></row><row _id="row-btri_d2up~3i9r" _uuid="00000000-0000-0000-E5C2-8BFC8146AD6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-btri_d2up~3i9r"><intent_id>635733</intent_id><project_id>685370</project_id><text_data>owner operator, Trucking</text_data><comment_date>2014-06-17T00:00:00</comment_date></row><row _id="row-pea2_ksrt~5b5b" _uuid="00000000-0000-0000-B154-145A209051C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pea2_ksrt~5b5b"><intent_id>820663</intent_id><project_id>811796</project_id><text_data>302417</text_data><comment_date>2017-03-14T00:00:00</comment_date></row><row _id="row-xq3p_swqj-y7d3" _uuid="00000000-0000-0000-297D-0A6145034F14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xq3p_swqj-y7d3"><intent_id>658077</intent_id><project_id>745710</project_id><text_data>#1 - heat pump installation #2 -  single family dwelling #3 -2  #4 - residence: (a) no (b) no (c) yes (d) no (e) no (f) no (g) no (h) no(i) no (j) no(k) no#5 - yes#6 - yes #7 - no #8 - no</text_data><comment_date>2014-10-01T00:00:00</comment_date></row><row _id="row-gtvq_fnma.2ugd" _uuid="00000000-0000-0000-D278-6632A718FA70" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gtvq_fnma.2ugd"><intent_id>593777</intent_id><project_id>720015</project_id><text_data>RL will be removing Purple Loosestrife from within the project boundaries by hand and removing the pulled materials and taking it to an appropriate disposal site. All work will be done by hand.</text_data><comment_date>2013-09-16T00:00:00</comment_date></row><row _id="row-4ppe~xbjb~zsqy" _uuid="00000000-0000-0000-B63A-DD7EF905D21B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ppe~xbjb~zsqy"><intent_id>942972</intent_id><project_id>823121</project_id><text_data>Filed by Teresa L Hendricks</text_data><comment_date>2018-10-31T00:00:00</comment_date></row><row _id="row-a899_ywvx-gvdq" _uuid="00000000-0000-0000-BF07-6462EF5475AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a899_ywvx-gvdq"><intent_id>1501791</intent_id><project_id>1135206</project_id><text_data>#1 - we were contracted to install smoke detectors, AFCI &amp; GFCI receptacles.#2 - the structure is other - low income housing.#3 - they range from 5 to 16 stories.#4 - a)no      b)no    c)no     d)no     e)yes   f)no   g)no    h)no   i)no   j)no    k)yes#5 - most do - not all  #6 - yes#7 - yes#8 - no</text_data><comment_date>2025-02-12T00:00:00</comment_date></row><row _id="row-9pjp.rdaf.b9un" _uuid="00000000-0000-0000-E92F-DC0960604567" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9pjp.rdaf.b9un"><intent_id>1501922</intent_id><project_id>1165706</project_id><text_data>WO# 1508160, 1510510, 1505940, 1510511, 1510517, 1510549, 1510512, 1513363, 1513849, 1513780, 1505523, 1505489, 1505485, 1505484, 1505483</text_data><comment_date>2025-01-16T00:00:00</comment_date></row><row _id="row-qgke.2uia-pdwf" _uuid="00000000-0000-0000-1506-D17024861879" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qgke.2uia-pdwf"><intent_id>1510610</intent_id><project_id>1171087</project_id><text_data>GFS JOB #281014</text_data><comment_date>2025-02-18T00:00:00</comment_date></row><row _id="row-8xex_d6v3_a5ff" _uuid="00000000-0000-0000-3802-EA8716F1AAC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8xex_d6v3_a5ff"><intent_id>1521106</intent_id><project_id>1177318</project_id><text_data>Other Truck is a Water Tanker for Dust Control</text_data><comment_date>2025-03-25T00:00:00</comment_date></row><row _id="row-qm9n~ta3b.e86q" _uuid="00000000-0000-0000-D731-62E28AB0C00D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qm9n~ta3b.e86q"><intent_id>1194093</intent_id><project_id>983784</project_id><text_data>Single Family Home#1 - Describe the work that your firm was contracted to perform INSULATION#2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominiumNO, or other residential structure? NO#3 - Including any basement or garage, how many stories or levels does the structure have? ONE#4 - What is the building used for? --Answer 'yes' or 'no' to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO G) Is each room and/or bed in the structure rented separately? NO (k) Other? NO#5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager's office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2021-11-18T00:00:00</comment_date></row><row _id="row-7vb4.ku6q~eu8s" _uuid="00000000-0000-0000-A745-80E12E50E497" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7vb4.ku6q~eu8s"><intent_id>722279</intent_id><project_id>769807</project_id><text_data>&amp;quot;TRUCK DRIVER OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK; &amp;quot;POWER EQUIPMENT OPERATOR MOTOR PATROL GRADER FINISHER&amp;quot; - NOT MOTOR PATROL, VACTOR GUZZLER/VACCON SUPER SUCKER</text_data><comment_date>2015-09-23T00:00:00</comment_date></row><row _id="row-sj9v_ksth~vgk8" _uuid="00000000-0000-0000-14E2-EF498BD5BF67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sj9v_ksth~vgk8"><intent_id>493875</intent_id><project_id>680085</project_id><text_data>Prairie Electric, Inc.�s fringe packages only include Health Plan, Vacation Plan, Holiday Plan, Pension Plan, and Apprentice Program.</text_data><comment_date>2011-12-18T00:00:00</comment_date></row><row _id="row-kc6b_u3c4~y7f6" _uuid="00000000-0000-0000-2DEA-08814D519C25" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kc6b_u3c4~y7f6"><intent_id>558199</intent_id><project_id>705917</project_id><text_data>Communication and data wiring within buildings.....jack installation and terminationPull communication wiring through existing conduit between two buildings also.</text_data><comment_date>2013-03-04T00:00:00</comment_date></row><row _id="row-hs9x-vduh~cx7u" _uuid="00000000-0000-0000-480B-6BB793CEDB77" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hs9x-vduh~cx7u"><intent_id>1041286</intent_id><project_id>896318</project_id><text_data>Omega job#059576</text_data><comment_date>2020-02-26T00:00:00</comment_date></row><row _id="row-4mww.kcdw.fzgz" _uuid="00000000-0000-0000-D1D6-5D44C668C71A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4mww.kcdw.fzgz"><intent_id>725597</intent_id><project_id>774369</project_id><text_data>From: Bosshard, Leeann J (LNI) Sent: Tuesday, October 20, 2015 7:42 AMTo: &amp;#39;kristi@nordictempcontrol.com&amp;#39;Subject: On Call Filing NoticeOn-call contracts have become a major focal point for state prevailing wage and procurement law issues. Recently the State Auditor�s Office (SAO) made this statement: On-Call contracts are not specifically authorized in state law. These contracts can result in noncompliance with the public works contracting and prevailing wage statutes.  Since the On-Call contracts are not authorized by state law, we recommend local governments establish policies, procedures and internal controls to ensure their contracting process is in compliance with public works contracting statutes (RCW Chapter 39.04, 39.06, 39.08 and 60.28) as well as prevailing wage statutes (RCW Chapter 39.12). L&amp;I reviews Intents and Affidavits for any conflict with the prevailing wage law. Prior to the most recent developments, L&amp;I provided guidance on Intent and Affidavit filing requirements for on-call/blanket/annual maintenance, cleaning, and repair contracts. The Intent is filed on the �contract� before any payment can be made. An Affidavit must be filed by each and every contractor and subcontractor following their completion of each �project. The �project� is each individual work order or call-out. The Intent will show �time and materials� for the contract dollar amount. The Affidavit will show the total dollar amount invoiced for each project (work order) including labor, materials and sales tax. Please include an explanation in the notes section of the Affidavit describing the nature of the work (i.e., sliding door replacement, change lock on computer room door, etc.) and the location/address (i.e., City Hall/Spring St., Courthouse/First Ave.). Also, note that you may not combine purchase orders onto one Affidavit. This allows project identification and tracking by the awarding agency and L&amp;I. If acting as the prime contractor, firms must ensure that the subcontractors follow the correct procedures.Please note that an on-call/blanket/annual contract may not be utilized for construction projects, or new equipment purchase/installations. Such contracts require their own set of Intent and Affidavit forms with the appropriate bid and award dates.  The use of on-call/blanket/annual contracts is limited to minor maintenance, cleaning, and repair work.  Contracts that are extended or renewed require the filing of a new Intent at the beginning of the extension period. Affidavits will link to the new Intent. Please indicate the duration of the contracting period (i.e., one year, two years, etc.) in the notes section of the form. On-call/blanket/annual forms for maintenance and repair contracts must be handled in the manner stated above with one Intent for the �contract� and an Affidavit for each individual work order/task order/call out (the �project�). This form filing requirement also applies to owner/operators. See RCW 39.12.040.We recommend that your firm and the awarding agency sign up to receive updates on regulations and policies through our electronic mailing list. If there are any changes to the on-call policy outlined above, the notification will be provided to all List Serve members. A link is provided below.http://www.lni.wa.gov/TradesLicensing/PrevWage/Listserv.aspIf you have any questions, please contact me.The answers provided are based upon the specific information provided.  References to the Revised Code of Washington (RCW) and Washington Administrative Code (WAC) are included.  If the facts differ from those provided, the answers may be different.Thank you,Leeann BosshardIndustrial Relations AgentDepartment of Labor and IndustriesPrevailing Wage ProgramPO Box 44540Olympia, WA 98504-4540(360) 902-5211Fax (360) 902-5300Leeann.Bosshard@lni.wa.gov**** Prevailing wage is fact specific. If the facts change, the answer could change.****</text_data><comment_date>2015-10-20T00:00:00</comment_date></row><row _id="row-vvks-47qb.este" _uuid="00000000-0000-0000-FB2D-4A9DAB14E8D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vvks-47qb.este"><intent_id>868155</intent_id><project_id>786199</project_id><text_data>Material Delivery Only - Concrete Ready Mix</text_data><comment_date>2017-10-10T00:00:00</comment_date></row><row _id="row-u5tf_4xns-er8n" _uuid="00000000-0000-0000-84D2-2DE71434FF0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u5tf_4xns-er8n"><intent_id>1167136</intent_id><project_id>887074</project_id><text_data>Our crew bolted / snapped the system together using flanged fittings and bauer fittings. Electric impact wrench / socket, Crescent adjustable wrench, and spud wrench for alignment. Prime contractor moves and placed the hoses for us with their equipment. This is a stream bypass, not sewer. We did no 'wet' work. We were there to assist the prime contractor in building the bypass.</text_data><comment_date>2021-08-14T00:00:00</comment_date></row><row _id="row-bema.mf3n.h83x" _uuid="00000000-0000-0000-F481-FC19F04A4F14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bema.mf3n.h83x"><intent_id>1051032</intent_id><project_id>839965</project_id><text_data>FILED BY MELISSA UNBEDACHT</text_data><comment_date>2020-04-13T00:00:00</comment_date></row><row _id="row-tegf-bp53-nzxy" _uuid="00000000-0000-0000-84C2-B758524957E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tegf-bp53-nzxy"><intent_id>561616</intent_id><project_id>707051</project_id><text_data>Landscape Construction- truck driver will be driving a 3000 gal truck mounted hydroseeder</text_data><comment_date>2013-03-26T00:00:00</comment_date></row><row _id="row-8c3s.mncq.mgeh" _uuid="00000000-0000-0000-D223-47DE8199165C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8c3s.mncq.mgeh"><intent_id>744516</intent_id><project_id>784077</project_id><text_data>Replace system from old building to new admin building.</text_data><comment_date>2016-02-02T00:00:00</comment_date></row><row _id="row-jnh3_af8a_s7ve" _uuid="00000000-0000-0000-EFD3-8576F1763096" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jnh3_af8a_s7ve"><intent_id>1016980</intent_id><project_id>878867</project_id><text_data>Install CAT6 cabling for voice and data. All work will be performed inside</text_data><comment_date>2019-10-22T00:00:00</comment_date></row><row _id="row-b9dt.5g6t~8rhb" _uuid="00000000-0000-0000-C33D-19502114140E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9dt.5g6t~8rhb"><intent_id>1276966</intent_id><project_id>1036581</project_id><text_data>7027110</text_data><comment_date>2022-10-21T00:00:00</comment_date></row><row _id="row-4ba2.6rdz_7aus" _uuid="00000000-0000-0000-F646-202822AD41A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ba2.6rdz_7aus"><intent_id>728871</intent_id><project_id>765844</project_id><text_data>Trucks are owned by Tiger Mountain, employees are paid by Lakeridge Paving.</text_data><comment_date>2015-10-29T00:00:00</comment_date></row><row _id="row-9she_rbu3.rruq" _uuid="00000000-0000-0000-C666-7CEF37A45406" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9she_rbu3.rruq"><intent_id>672997</intent_id><project_id>752294</project_id><text_data>This is on-call emergency work, contract value is not known</text_data><comment_date>2015-01-09T00:00:00</comment_date></row><row _id="row-5bbn_be8z~imh2" _uuid="00000000-0000-0000-88B1-B3EAFFBFF3C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5bbn_be8z~imh2"><intent_id>1354370</intent_id><project_id>1082269</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 6 for voice (telephone) and data (computer networking) indoors. POWERCOM JOB #959979</text_data><comment_date>2023-08-15T00:00:00</comment_date></row><row _id="row-u28h~gf7t_ztww" _uuid="00000000-0000-0000-238C-71047F735DA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u28h~gf7t_ztww"><intent_id>950512</intent_id><project_id>868548</project_id><text_data>other trucks include water truck and tractor/trailer for equipment mob</text_data><comment_date>2018-12-12T00:00:00</comment_date></row><row _id="row-mpmk~arc5~mmz6" _uuid="00000000-0000-0000-4984-691055ECAFA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpmk~arc5~mmz6"><intent_id>829590</intent_id><project_id>811429</project_id><text_data>Kenworth Tractor w/Single Drop Trailer</text_data><comment_date>2017-05-12T00:00:00</comment_date></row><row _id="row-has9_gp3u-bk7p" _uuid="00000000-0000-0000-0FD8-A7E3DCC8B846" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-has9_gp3u-bk7p"><intent_id>699329</intent_id><project_id>759215</project_id><text_data>RE:  L&amp;I Data Center Improvements1.	 What is/was the specific purpose of this awarding agency�s public works project?  Modifications to existing HVAC system. 2.	Does this project include fabrication, delivery, installation of non-standard item(S) fabricated according to specifications specifically for a public works project?  If yes, please describe the item(s) in detail.  No  3.	Does this specific project entail the remodeling or new construction of a facility?  Remodeling4.	If your firm is working upon a type of building system, what type of system is involved?  HVAC Direct Digital Control Systems5.	What specific tasks will your employees perform?  Engineering, programming, component testing and operation verification.6.	What, if any, tools will your employees use in the performance of those tasks?  Laptop and software7.	If your employees will use no tools, will they engage in any other type of manual, hands on efforts completing their tasks?  Interface to system using laptop computers and software for programming, checkout and commissioning. 8.	Are you going to be hiring any subcontractors for this project?  Yes.</text_data><comment_date>2015-06-09T00:00:00</comment_date></row><row _id="row-37pd~nd2d_c2mu" _uuid="00000000-0000-0000-BEE0-D73F7F55C1D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-37pd~nd2d_c2mu"><intent_id>1162449</intent_id><project_id>885548</project_id><text_data>1.    What is the specific purpose of this awarding agency�s public works project? Examples are: Remodel existing building, construct parking garage, update electrical wiring in East Wing, install new heat pump, etc.Construction of the Marine structural components for Mukilteo Ferry Terminal berthing of ferries, and loading of vehicles and passengers. This contract also includes the construction of a public fishing pier adjacent to the Ferry Terminal.2.    Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)]All fabrication, delivery, and installation are for Washington Ferry engineered standard components.3.    Does this specific project entail the remodeling or new construction of a facility?Yes4.    If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc.No firms are working on building systems5.    What specific tasks will your employees perform? eTrac is performing onsite hydrographic survey data collection and remote data processing6.    What, if any, tools will your employees use in the performance of those tasks?eTrac uses a boat and multi-beam survey equipment for onsite tasks7.    If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? No.8.    Are you going to be hiring any subcontractors for this project?eTrac will not be hiring any lower tier subcontractors.9.    When is the work your performing on the project be completed?eTrac�s expected completion is February 2021</text_data><comment_date>2021-07-22T00:00:00</comment_date></row><row _id="row-5xs7.jc3z~6guy" _uuid="00000000-0000-0000-55C2-21E67335EA49" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5xs7.jc3z~6guy"><intent_id>829442</intent_id><project_id>819292</project_id><text_data>Emergency response to transformer spillHaz Waste workers to clear area of all debris using brooms, shovels and rakesMotor Patrol Grader to vacuum area of all contaminated liquids</text_data><comment_date>2017-04-27T00:00:00</comment_date></row><row _id="row-rigz-fncy~p7ad" _uuid="00000000-0000-0000-CFC8-6B85703CFD68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rigz-fncy~p7ad"><intent_id>1120054</intent_id><project_id>834967</project_id><text_data>Prime Electric Job # 1001343</text_data><comment_date>2021-02-04T00:00:00</comment_date></row><row _id="row-c325_qtcn.v7v5" _uuid="00000000-0000-0000-6310-6E6D9927EC19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c325_qtcn.v7v5"><intent_id>1501569</intent_id><project_id>1165504</project_id><text_data>Tacoma - Invoice 5002656811Fringe Benefits-  Health Plan $16.175 Pension Plan 10.860 Educational Fund 0.75 Preservation Fund 1.30 Annuity 10.10 Vacation/Holiday $7.33 = 46.52 Rounded</text_data><comment_date>2025-01-15T00:00:00</comment_date></row><row _id="row-zxpk~652k.ymjn" _uuid="00000000-0000-0000-F3BB-29CD1FD5B0F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxpk~652k.ymjn"><intent_id>825475</intent_id><project_id>813649</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2017-04-10T00:00:00</comment_date></row><row _id="row-sgg6.wuwv~q2gt" _uuid="00000000-0000-0000-91E4-354A7281A7FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sgg6.wuwv~q2gt"><intent_id>471277</intent_id><project_id>587278</project_id><text_data>All work performed in shop at 1515 75th St SW, Ste 600, Everett, WA 98203</text_data><comment_date>2011-08-09T00:00:00</comment_date></row><row _id="row-rg6n_dgsz.x6pb" _uuid="00000000-0000-0000-C9CD-3D5EBC4EA2B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rg6n_dgsz.x6pb"><intent_id>897847</intent_id><project_id>811676</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2018-04-10T00:00:00</comment_date></row><row _id="row-sazd_cw48_y5bq" _uuid="00000000-0000-0000-62CB-DF2FDDA4A008" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sazd_cw48_y5bq"><intent_id>835999</intent_id><project_id>822523</project_id><text_data>-exterior power washing buildings-apply house cleaner prior to power wash-wash all siding with 1000 PSI with 45 degree tips-hand clean any heavy area</text_data><comment_date>2017-07-06T00:00:00</comment_date></row><row _id="row-m4c7.d6bv.xdyv" _uuid="00000000-0000-0000-A39C-76C57752967F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m4c7.d6bv.xdyv"><intent_id>1259913</intent_id><project_id>942068</project_id><text_data>Workers Compensation Account is SAIF #870005</text_data><comment_date>2022-08-21T00:00:00</comment_date></row><row _id="row-re98-qj72-gui4" _uuid="00000000-0000-0000-9A76-47F6D393BB52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-re98-qj72-gui4"><intent_id>1195720</intent_id><project_id>855643</project_id><text_data>Manually plant see/hydroseed</text_data><comment_date>2022-01-12T00:00:00</comment_date></row><row _id="row-u8fb~wm8p_w38s" _uuid="00000000-0000-0000-B8D9-23A8CA74C0E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u8fb~wm8p_w38s"><intent_id>928981</intent_id><project_id>859948</project_id><text_data>Using Company vehicle to and from job site. Replace existing glue down carpet, and installed cove base. Used tile tabs (adhesive)</text_data><comment_date>2018-08-28T00:00:00</comment_date></row><row _id="row-ztme.ke84~v4vh" _uuid="00000000-0000-0000-7D80-D5F397179D7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ztme.ke84~v4vh"><intent_id>1154089</intent_id><project_id>956929</project_id><text_data>***SELF-INSURED***</text_data><comment_date>2021-06-21T00:00:00</comment_date></row><row _id="row-bkpp_2j9c.wkwb" _uuid="00000000-0000-0000-46A6-9DF6D5B5AD78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bkpp_2j9c.wkwb"><intent_id>702156</intent_id><project_id>741141</project_id><text_data>HIRED BY DMI DRILLING CONSTRUCTION</text_data><comment_date>2015-06-19T00:00:00</comment_date></row><row _id="row-b6xm-kh47.k5aa" _uuid="00000000-0000-0000-F84E-8EAA3A5E4A01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b6xm-kh47.k5aa"><intent_id>561502</intent_id><project_id>707439</project_id><text_data>CASA DEL ORO APTS MANAGER16515 B ST ESPANAWAY WA 98387</text_data><comment_date>2013-03-25T00:00:00</comment_date></row><row _id="row-fx8g~ekg5-i5aq" _uuid="00000000-0000-0000-872C-95C6176B7865" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fx8g~ekg5-i5aq"><intent_id>1130640</intent_id><project_id>950141</project_id><text_data>1.Replace 2 bath fans &amp; switches2.Single Family Dwelling3.14.a. No; b. No; c. Yes; d. No; e. No; f. No; g. No; h. No; i. No; j. No; k. No; l. No5.Yes6.Yes7.No8.No</text_data><comment_date>2021-03-23T00:00:00</comment_date></row><row _id="row-supp_8aef-xbcr" _uuid="00000000-0000-0000-7753-4F28BF8400F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-supp_8aef-xbcr"><intent_id>658020</intent_id><project_id>745683</project_id><text_data>Form filed by: Sheila Henshaw</text_data><comment_date>2014-10-01T00:00:00</comment_date></row><row _id="row-nrid.k2x8.ix9x" _uuid="00000000-0000-0000-A7DA-93405B124256" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrid.k2x8.ix9x"><intent_id>967024</intent_id><project_id>876428</project_id><text_data># of workers shows # of employees whom are capable of performing craft.</text_data><comment_date>2019-03-22T00:00:00</comment_date></row><row _id="row-9c8m_6aky_kapz" _uuid="00000000-0000-0000-4C8F-542ED3686E9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9c8m_6aky_kapz"><intent_id>534907</intent_id><project_id>696100</project_id><text_data>THE SCOPE FOR THIS PROJECT IS DATA CABLING FOR IP CAMERAS</text_data><comment_date>2012-09-18T00:00:00</comment_date></row><row _id="row-qpta.r5zt_sak7" _uuid="00000000-0000-0000-1FCC-E4EE2854A09B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qpta.r5zt_sak7"><intent_id>613907</intent_id><project_id>728145</project_id><text_data>WIM Job 10136</text_data><comment_date>2014-01-28T00:00:00</comment_date></row><row _id="row-xp2p.42ep.4x8b" _uuid="00000000-0000-0000-9C2B-F51BD66ACA26" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xp2p.42ep.4x8b"><intent_id>957741</intent_id><project_id>872010</project_id><text_data>Need to refile a new intent because the UBI number that was used to file this intent was Garo's old UBI number. Per L&amp;I Customer Service, once a new one is filed, this will be deleted.</text_data><comment_date>2019-02-01T00:00:00</comment_date></row><row _id="row-z7x4~g5xg-te8y" _uuid="00000000-0000-0000-720E-ABA1132CEE76" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z7x4~g5xg-te8y"><intent_id>471842</intent_id><project_id>672180</project_id><text_data>Retirement 1.56  Health Care 6.36  Long Term &amp; short Term Disability .72 Holiday Vacation 2.00</text_data><comment_date>2011-08-29T00:00:00</comment_date></row><row _id="row-a8uy-9gmw~znsz" _uuid="00000000-0000-0000-03A0-AEE677544E73" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a8uy-9gmw~znsz"><intent_id>475520</intent_id><project_id>673482</project_id><text_data>The work in question has been / was  missed categorized.  The ducting is already insulated, our scope of work is to apply an protective covering.  This covering is to be spray applied urethane roofing foam and spray applied acrylic roofing coating.  This application takes highly specialized equipment and trained people.  As the products we intend on installing are actually roofing products and the intent of the project is to protect the existing insulation materials from the elements, this statement of intent to pay prevailing wage should be the roofers classification.</text_data><comment_date>2011-09-23T00:00:00</comment_date></row><row _id="row-pz3i.cx5c_5q2p" _uuid="00000000-0000-0000-BE78-08C010A22888" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pz3i.cx5c_5q2p"><intent_id>513322</intent_id><project_id>679340</project_id><text_data>Filed by: Rick Street</text_data><comment_date>2012-05-23T00:00:00</comment_date></row><row _id="row-8iba_s6it_67x4" _uuid="00000000-0000-0000-29EB-DF0CA0018DFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8iba_s6it_67x4"><intent_id>812200</intent_id><project_id>809515</project_id><text_data>RCC-S36253 JD/MS</text_data><comment_date>2017-01-21T00:00:00</comment_date></row><row _id="row-gxzq-8im3-xsfa" _uuid="00000000-0000-0000-BAAA-D67B9CAE4EFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gxzq-8im3-xsfa"><intent_id>560581</intent_id><project_id>707013</project_id><text_data>Residential Qs1. Retro fit windows at patio doors to be installed2. This structure is an Apartment3. 3 Stories4. Building Use: A. NO B. NO C. YES with lease contract D NO E. NO F. NO G. NO H. NO I. NO J. NO K. NA5. Yes, self contained kitchen6. Yes own bathroom7. Managers office, YES - Cabana area8. NO public use</text_data><comment_date>2013-04-05T00:00:00</comment_date></row><row _id="row-3viq~ifwc~j2j9" _uuid="00000000-0000-0000-26F7-C0E8097B912E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3viq~ifwc~j2j9"><intent_id>663051</intent_id><project_id>741212</project_id><text_data>Form filed by: Dawning Delong�Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the above crafts/trades/occupations.�</text_data><comment_date>2014-10-29T00:00:00</comment_date></row><row _id="row-567z-enmd.usw2" _uuid="00000000-0000-0000-825D-704E6CD245FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-567z-enmd.usw2"><intent_id>1084177</intent_id><project_id>928332</project_id><text_data>0720069</text_data><comment_date>2020-08-28T00:00:00</comment_date></row><row _id="row-35a5.99u3_rgzy" _uuid="00000000-0000-0000-9AB5-E3398F2AB7FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-35a5.99u3_rgzy"><intent_id>689142</intent_id><project_id>737365</project_id><text_data>Water system improvements consisting of approximately 23,700 linear feet of 4-inch through 16-inch water main pipe with valves, fittings, thrust blocks, trench excavation and backfill, horizontal directional frill, steel encased pipe, fiber optic cable in conduit, surface restorations, connections to existing water systems and other appurtenant items in Clark County, Washington in and around SR 502 (NE 219th Street).  C&amp;R Tractor will be spreading approx 1.5 acres of temporary seeding. We will be using approximately 180# of seed and 180 bales of mulch. We will be using a hydroseeder to spread the seed and mulch, using one operator.</text_data><comment_date>2015-04-15T00:00:00</comment_date></row><row _id="row-2zpu-buxr.7pu4" _uuid="00000000-0000-0000-2E53-6CAF2ED3956C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2zpu-buxr.7pu4"><intent_id>1240156</intent_id><project_id>1016991</project_id><text_data>1.     Wx work 2. Y 3. 1 4. residence a.n b. n c. y d.n e. n f. n g. n h. n i. n j. n k. n l. n 5. y 6. y 7. n 8 n</text_data><comment_date>2022-06-09T00:00:00</comment_date></row><row _id="row-xia2-rvx9~hnvi" _uuid="00000000-0000-0000-092D-FC7E9817EDE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xia2-rvx9~hnvi"><intent_id>956143</intent_id><project_id>866398</project_id><text_data>1. Domestic water piping, DWV piping, and labor through final trim. 2. Three story apartment.3. Three4. a.)No b.) No c.)Yes d.)No e.) No f.)No g.)No h.)No i.)No j.)No k.)Yes l.)No5. Yes6. Yes7. Yes8. No</text_data><comment_date>2019-01-28T00:00:00</comment_date></row><row _id="row-iu53_xp6w.akmj" _uuid="00000000-0000-0000-68E0-6599890F417F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iu53_xp6w.akmj"><intent_id>745583</intent_id><project_id>784094</project_id><text_data>Furnish and install all earthwork, utilities and site demolition.</text_data><comment_date>2016-02-08T00:00:00</comment_date></row><row _id="row-4fe6_c3mx.5kpd" _uuid="00000000-0000-0000-31B3-924F90B801F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4fe6_c3mx.5kpd"><intent_id>1034431</intent_id><project_id>906130</project_id><text_data>Telecom Tech: Attaching computer networking equipment (cord and plug) to existing telecommunications racks, indoors.</text_data><comment_date>2020-01-28T00:00:00</comment_date></row><row _id="row-frcm.nm99.4qq2" _uuid="00000000-0000-0000-94F2-8529732A4A9E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-frcm.nm99.4qq2"><intent_id>606145</intent_id><project_id>724591</project_id><text_data>KVA Electric is Exempt from Electrical Licensing per RCW 19.28.091 and WAC 46B-925.17</text_data><comment_date>2013-11-25T00:00:00</comment_date></row><row _id="row-su9w~g6b2.mduz" _uuid="00000000-0000-0000-79D8-C6F0FD51EF2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-su9w~g6b2.mduz"><intent_id>1270156</intent_id><project_id>977224</project_id><text_data>Routine landscape services which includes mowing regularly, weedeating regularly, hand pruning as needed, leaf and trash removal as needed.  Our prime contractor has a vast array of other work they have been doing, including installation of landscaping.  Our role is only to maintain the landscape maintenance</text_data><comment_date>2022-10-25T00:00:00</comment_date></row><row _id="row-xdf7_zkb3.avr8" _uuid="00000000-0000-0000-D26C-DA9A73575605" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdf7_zkb3.avr8"><intent_id>532141</intent_id><project_id>692957</project_id><text_data>MEDICAL, $1.62/HRVACATION, $.77/HRHOLIDAY, $.77/HR</text_data><comment_date>2012-08-31T00:00:00</comment_date></row><row _id="row-thyn~ayg2~6zzq" _uuid="00000000-0000-0000-A7D9-B560C63BBE97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thyn~ayg2~6zzq"><intent_id>736940</intent_id><project_id>780456</project_id><text_data>Project Description: Retrofit the existing cathodic protection system on one underground fuel storage tank. Duties: Secure work area with barricades and caution tape. Hand excavate and install of two anodes, manual backfill. Tools: Shovel, Volt meter.</text_data><comment_date>2015-12-14T00:00:00</comment_date></row><row _id="row-aafw_9g23.we4h" _uuid="00000000-0000-0000-34B4-FB6D9BD9B0B8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aafw_9g23.we4h"><intent_id>773468</intent_id><project_id>796463</project_id><text_data>Filed by Heidi Anne Steckler</text_data><comment_date>2016-07-08T00:00:00</comment_date></row><row _id="row-mpzc.k8nn.2aj9" _uuid="00000000-0000-0000-E391-8C09367FEF6C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mpzc.k8nn.2aj9"><intent_id>1510577</intent_id><project_id>1171076</project_id><text_data>Other Truck is a Chevy 2500 pickup pulling a boat trailer.</text_data><comment_date>2025-02-18T00:00:00</comment_date></row><row _id="row-vxwc~qu5v_ndre" _uuid="00000000-0000-0000-F643-24D8CF664AA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vxwc~qu5v_ndre"><intent_id>1516094</intent_id><project_id>1174351</project_id><text_data>Original limited energy license number ADTCOCL801UQ was in effect from 3/31/20 to 3/31/26. New license number EVEROL*752CM took over and is good from 2/14/25 to 2/14/27.</text_data><comment_date>2025-03-26T00:00:00</comment_date></row><row _id="row-ckj4-3r3f_fg7t" _uuid="00000000-0000-0000-F763-C4DA4F75A6A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ckj4-3r3f_fg7t"><intent_id>1198581</intent_id><project_id>898694</project_id><text_data>Krazan will not hire any subcontractors. I have been told to check that box as yes because none of the work categories apply to Inspection Services. We are exempt with a work not performed.1.     What is the specific purpose of this awarding agency�s public works project? To inspect work performed by the prime contractor while they construct the I-405 Renton to Bellevue Widening and Express Lanes. 2.     Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes please describe the item(s) in detail. [See WAC 296-127-010(7)(a)(vi), WAC 296-127-020(3)].Answer: NO 3.     Does this specific project entail the remodeling or new construction of a facility?Answer: NO 4.     If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm systems, telecommunication cabling, etc.Answer: N/A 5.     What specific tasks will your employees perform?Answer: Inspection Services. We will use our eyes to read the plan specifications and make sure that the contractor is following those plans and specs. 6.     What, if any, tools will your employees se in performance of those tasks?Answer: None 7.     If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?Answer: NO 8.     Are you going to be hiring any subcontractors for this project?Answer: NO</text_data><comment_date>2021-12-10T00:00:00</comment_date></row><row _id="row-ws3s.gahk.5d9y" _uuid="00000000-0000-0000-3EE3-D1C894024AC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ws3s.gahk.5d9y"><intent_id>694906</intent_id><project_id>762410</project_id><text_data>Single Dwelling CEEP Project</text_data><comment_date>2015-05-15T00:00:00</comment_date></row><row _id="row-xt6s~w39b.9rkn" _uuid="00000000-0000-0000-0119-CC7668024CAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xt6s~w39b.9rkn"><intent_id>514274</intent_id><project_id>688566</project_id><text_data>Filed by Roger Schrieber</text_data><comment_date>2012-05-30T00:00:00</comment_date></row><row _id="row-49ye_jeya_7a8u" _uuid="00000000-0000-0000-3277-8DFB60AD99DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-49ye_jeya_7a8u"><intent_id>646078</intent_id><project_id>741137</project_id><text_data>Scope of Work:  install 2 inch drainage pipe at a depth of less than 3 feet around pond using shovels,digging bars,hand tools,rakes and wheelbarrows.</text_data><comment_date>2014-08-06T00:00:00</comment_date></row><row _id="row-97ua~es7k~nhes" _uuid="00000000-0000-0000-0C78-2556EF5115AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-97ua~es7k~nhes"><intent_id>638754</intent_id><project_id>733189</project_id><text_data>Installation and termination of copper UTP cabling for computer network inside elementary school portable classroom building. Conforms to WAC 296-127-01378 for work inside a building and terminating in MDF and IDF locations. Further complies with RCW19.28.400(13)(a) Telecommunications systems encompass all forms of information generation, processing, and transporting of signals conveyed electronically or optically within or between buildings, including voice, data, video, and audio.  Work is not specifically called out as Electronic Technician scope.</text_data><comment_date>2014-07-03T00:00:00</comment_date></row><row _id="row-5j9n_56g9-dd3n" _uuid="00000000-0000-0000-451E-EF2714EF6F18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5j9n_56g9-dd3n"><intent_id>746598</intent_id><project_id>785020</project_id><text_data>#1 Bath fan,Panel inspection &amp; Attic J-boxes. #2 Single Family dwelling #3 1 story BLDG #4(a)no (b)no (c)yes (d)no (e)no (f)no (g)no (h)no (i)no (j)no(k)no #5 1 family dwelling kitchen #6 1 family dwelling bathroom #7 no places #8 no public use.</text_data><comment_date>2016-02-13T00:00:00</comment_date></row><row _id="row-9w5m.rfe8_s92z" _uuid="00000000-0000-0000-B23A-FC56A335A4D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9w5m.rfe8_s92z"><intent_id>1255261</intent_id><project_id>1012903</project_id><text_data>Horizon ES</text_data><comment_date>2022-08-04T00:00:00</comment_date></row><row _id="row-6jfy.jtnz_dzrt" _uuid="00000000-0000-0000-6DFC-2D5A3F05DCBD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6jfy.jtnz_dzrt"><intent_id>1286694</intent_id><project_id>1033380</project_id><text_data>All electrical work will be done in single family residence. None will have commercial use or will have any use other than a single family residence</text_data><comment_date>2022-11-30T00:00:00</comment_date></row><row _id="row-chxe_e9r6~gykw" _uuid="00000000-0000-0000-7DDF-209218BF6D9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-chxe_e9r6~gykw"><intent_id>540825</intent_id><project_id>696466</project_id><text_data>Will pay Davis Bacon rate that is 50.95 - fringe 5.75 the wage will be $45.20.</text_data><comment_date>2012-10-19T00:00:00</comment_date></row><row _id="row-qzh6_y7g7.npue" _uuid="00000000-0000-0000-9414-8B26EF7AAAA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qzh6_y7g7.npue"><intent_id>646966</intent_id><project_id>741479</project_id><text_data>Client:  Sova</text_data><comment_date>2014-08-11T00:00:00</comment_date></row><row _id="row-cb59-c36c-6g4q" _uuid="00000000-0000-0000-55E1-A3A240686727" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cb59-c36c-6g4q"><intent_id>1080245</intent_id><project_id>929083</project_id><text_data>91�s normal truck is a 2013 Freightliner Columbia model. The truck holds 4500 gal and the trailer 5000 gal. 80,000# max load. Most of the fuel trucks are similar In size.</text_data><comment_date>2020-08-17T00:00:00</comment_date></row><row _id="row-ynd4~x9ui~pcg6" _uuid="00000000-0000-0000-1A89-1A4A44FA92AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ynd4~x9ui~pcg6"><intent_id>920858</intent_id><project_id>856927</project_id><text_data>Filed by Victoria Clark</text_data><comment_date>2018-07-25T00:00:00</comment_date></row><row _id="row-iy8a~5xd8~7ytk" _uuid="00000000-0000-0000-6400-A0765CA01CF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iy8a~5xd8~7ytk"><intent_id>828929</intent_id><project_id>819083</project_id><text_data>Filed by J. Caruso</text_data><comment_date>2017-04-25T00:00:00</comment_date></row><row _id="row-43u2.5i3y_5ajn" _uuid="00000000-0000-0000-0A82-1A7AD6322D57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-43u2.5i3y_5ajn"><intent_id>917401</intent_id><project_id>855711</project_id><text_data>Job 910960</text_data><comment_date>2018-07-11T00:00:00</comment_date></row><row _id="row-v2rc-4zwi.j8bg" _uuid="00000000-0000-0000-80ED-AADF27E80345" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v2rc-4zwi.j8bg"><intent_id>770658</intent_id><project_id>792189</project_id><text_data>Filed by Kim Burnside</text_data><comment_date>2016-06-24T00:00:00</comment_date></row><row _id="row-uh7p-wstu-44d4" _uuid="00000000-0000-0000-5FB5-3FB6FDE5ADFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uh7p-wstu-44d4"><intent_id>733199</intent_id><project_id>773785</project_id><text_data>#1 - Renovation of the Woodhaven and Cedar West Apartments#2 - Apartment complex#3 - Don&amp;#39;t know#4 - A) No, B) No, C) No, D) No, E) No, F) No, G) No, H) No, I) No, J) Yes, K)No.#5 - Yes#6 - Yes#7 - Don&amp;#39;t know#8 - No</text_data><comment_date>2015-11-25T00:00:00</comment_date></row><row _id="row-3y5j~8e2v_t3ie" _uuid="00000000-0000-0000-1A23-5525B6AA9C78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3y5j~8e2v_t3ie"><intent_id>618492</intent_id><project_id>725650</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-03-04T00:00:00</comment_date></row><row _id="row-2bt5-9dg4-xm2m" _uuid="00000000-0000-0000-0B85-2D24F1CFCA7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2bt5-9dg4-xm2m"><intent_id>964977</intent_id><project_id>748148</project_id><text_data>This is phase 2 of the Whidby Island hospital expansion, the work has been completed for a while, we did phase 1 and phase 2, it is a brand new addition with lawns plants and irrigation, we used small f 450 trucks and mini track hoes and bobcat skid steer loaders the job consisted of irrigation,soil and plantings and maintenance</text_data><comment_date>2019-03-13T00:00:00</comment_date></row><row _id="row-hu2t.hrn5.h32f" _uuid="00000000-0000-0000-E9FC-C6FE76FAFE43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hu2t.hrn5.h32f"><intent_id>799733</intent_id><project_id>802064</project_id><text_data>Hired as an Janitorial Service to dust off vent Covers and Shampoo Carpet Project is for Lease Renewal Maintenance Cleaning. There is no Construction taking place for this contract, which does not require after constructionclean up.</text_data><comment_date>2016-11-03T00:00:00</comment_date></row><row _id="row-99eu.stpn-uhxk" _uuid="00000000-0000-0000-3DCA-5A4C4C538848" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-99eu.stpn-uhxk"><intent_id>1213869</intent_id><project_id>997048</project_id><text_data>HM Job 4228</text_data><comment_date>2022-02-25T00:00:00</comment_date></row><row _id="row-5fie-7pd4-jtzw" _uuid="00000000-0000-0000-F038-57C5CA786E9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fie-7pd4-jtzw"><intent_id>1184225</intent_id><project_id>982906</project_id><text_data>Truck Driver rate is paid to employees driving company issued trucks to transport materials/supplies pertaining to the job site.</text_data><comment_date>2021-10-08T00:00:00</comment_date></row><row _id="row-6e3r_a24b-jytw" _uuid="00000000-0000-0000-33E2-4B31B7248122" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6e3r_a24b-jytw"><intent_id>466686</intent_id><project_id>649169</project_id><text_data>GWB / TAPE SCRAP AND SWEEPING</text_data><comment_date>2011-07-19T00:00:00</comment_date></row><row _id="row-kdfx_4tyc-ptmh" _uuid="00000000-0000-0000-3EB9-E9E5FB68B47C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kdfx_4tyc-ptmh"><intent_id>743181</intent_id><project_id>770717</project_id><text_data>I the owner did all the work, in a single family home with a garage in the lower level. I wired a fan in a back bedroom for one of the owners children.</text_data><comment_date>2016-01-24T00:00:00</comment_date></row><row _id="row-bsx9_t72v-5fx3" _uuid="00000000-0000-0000-BC31-0E88F8C09E4F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bsx9_t72v-5fx3"><intent_id>761399</intent_id><project_id>791684</project_id><text_data>Truck Drivers-Other Trucks: This is for operation of a roll-off/drop box truck.</text_data><comment_date>2016-05-11T00:00:00</comment_date></row><row _id="row-3qhk_p2td_a68i" _uuid="00000000-0000-0000-1E32-971DDBADC362" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3qhk_p2td_a68i"><intent_id>827341</intent_id><project_id>818428</project_id><text_data>Filed by Vic Dell</text_data><comment_date>2017-04-18T00:00:00</comment_date></row><row _id="row-i24e_j7fq_cb9g" _uuid="00000000-0000-0000-E046-8DDF4124B4F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i24e_j7fq_cb9g"><intent_id>1168989</intent_id><project_id>975052</project_id><text_data>Infrastructure data cabling/work will be preformed inside the building.</text_data><comment_date>2021-08-13T00:00:00</comment_date></row><row _id="row-b5kw.ai4z.ktd2" _uuid="00000000-0000-0000-E1B6-22880E42DFB0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b5kw.ai4z.ktd2"><intent_id>1220731</intent_id><project_id>1005122</project_id><text_data>A)  B)  Anderson Landscaping to Install trees (2' caliper), Install root barrier panels (24'),  prep and install sod area.  Install bark mulch (3' deep).  Equipment to be used:  Ditchwitch 1550 with bucket (Under 92 HP).  Labor using shovels and rakes to place bark mulch and prep sod area..</text_data><comment_date>2022-03-25T00:00:00</comment_date></row><row _id="row-ixnw-hpt9.xxht" _uuid="00000000-0000-0000-1956-93D900881EA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ixnw-hpt9.xxht"><intent_id>1237900</intent_id><project_id>1012854</project_id><text_data>Betty Barnes, 2805 76th Ave SW #1, Tumwater, WA 985121.Heating system 2. Single family Mobile Home 3 Single story   a - 8 This is a personal home</text_data><comment_date>2022-06-01T00:00:00</comment_date></row><row _id="row-y2pv_xezy.4wxf" _uuid="00000000-0000-0000-ABC8-14F53E379E9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y2pv_xezy.4wxf"><intent_id>449657</intent_id><project_id>517813</project_id><text_data>Industrial Insurance Account Id: 848,900-00</text_data><comment_date>2011-04-13T00:00:00</comment_date></row><row _id="row-jt83~8a6q~wsky" _uuid="00000000-0000-0000-D2F5-5E3920042DEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jt83~8a6q~wsky"><intent_id>651129</intent_id><project_id>743053</project_id><text_data>103,104,105,106,107,108,109,110,111,112,113,114,115,116,117,118,119,120,121,122</text_data><comment_date>2014-08-28T00:00:00</comment_date></row><row _id="row-wnur_9qmb-u9fb" _uuid="00000000-0000-0000-95AC-347694E8AAEE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wnur_9qmb-u9fb"><intent_id>1354830</intent_id><project_id>1012644</project_id><text_data>Truck Drivers will be driving either a 2019 HINO 268A or 2016 HINO 155 flatbed truck. The purpose is to get materials and/or prefabricated materials to the jobsite.</text_data><comment_date>2023-08-16T00:00:00</comment_date></row><row _id="row-csap.3r5c.rwf8" _uuid="00000000-0000-0000-C09A-82DC47D92AD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-csap.3r5c.rwf8"><intent_id>864143</intent_id><project_id>833121</project_id><text_data>1517247</text_data><comment_date>2017-09-20T00:00:00</comment_date></row><row _id="row-afsi~djqe_u7yg" _uuid="00000000-0000-0000-6CFA-064DDCDDEE37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-afsi~djqe_u7yg"><intent_id>1195066</intent_id><project_id>985523</project_id><text_data>Truck is a 26' flatbed</text_data><comment_date>2021-11-23T00:00:00</comment_date></row><row _id="row-f4vy-s6ep_re9p" _uuid="00000000-0000-0000-920E-D8255549AC67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f4vy-s6ep_re9p"><intent_id>638419</intent_id><project_id>723079</project_id><text_data>Health &amp; Welfare $7.55Pension $8.40Training $0.70</text_data><comment_date>2014-07-01T00:00:00</comment_date></row><row _id="row-hust-kaaa_fmjp" _uuid="00000000-0000-0000-EB0E-ED65B367395A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hust-kaaa_fmjp"><intent_id>952287</intent_id><project_id>869382</project_id><text_data>Filed by Brian KettnerProject is exempt from State Prevailing Wage Rates based on the Housing Act of 1937 &amp; 24 CFR 965.101. All workers will be paid in accordance with Davis Bacon wage requirements for the following crafts/trades/occupations</text_data><comment_date>2018-12-26T00:00:00</comment_date></row><row _id="row-7u46-6ex7_34vi" _uuid="00000000-0000-0000-DAA1-E75ACB713C86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7u46-6ex7_34vi"><intent_id>619971</intent_id><project_id>721091</project_id><text_data>3. 4 levels, 4. A No, B No, C Yes, D No, E No, F No, G No, H No, I No, J No, K No, 5. Yes, 6. Yes, 7. No, 8. No</text_data><comment_date>2014-03-28T00:00:00</comment_date></row><row _id="row-3355.2hjg_puiw" _uuid="00000000-0000-0000-9F5E-FEF73979FCFE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3355.2hjg_puiw"><intent_id>1251921</intent_id><project_id>1023355</project_id><text_data>The Laborers duties include:setting up infection controlputting down ram board for floor protectiontaping with plastic anything left inside the operating roomssetting up the negative air machine to create negative pressure in the roomdealing with our subcontractors dailyremoving the existing equipment hanging from the ceilingdisposing the old equipment in a dumpsterinstalling the new equipmentinstall new mounting bolts and nutssetting up and testing new equipment per manufacturer's manualcleaning up the room on daily basisdocumenting through photos and online documents dailyTools/Equipment/Vehicle used include:wrenchestorque wrenchesHVAC duct jack material liftallen wrenchesscrewdriverstorpedo levelutility knifecordless drillcordless impact1 car to drive to and from the hotel to the hospital</text_data><comment_date>2022-08-11T00:00:00</comment_date></row><row _id="row-6w8b_z2in~ishc" _uuid="00000000-0000-0000-47A8-4CD2DA40AE12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6w8b_z2in~ishc"><intent_id>869934</intent_id><project_id>831626</project_id><text_data>Filed by John Welcher</text_data><comment_date>2017-10-18T00:00:00</comment_date></row><row _id="row-fw2s-s7s8-rffz" _uuid="00000000-0000-0000-2757-F65CBFCCF5EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fw2s-s7s8-rffz"><intent_id>564151</intent_id><project_id>685370</project_id><text_data>All work performed will be in our Redmond shop.</text_data><comment_date>2013-04-11T00:00:00</comment_date></row><row _id="row-6xva.frmk-s293" _uuid="00000000-0000-0000-5E2B-120388DCF38B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6xva.frmk-s293"><intent_id>491576</intent_id><project_id>627684</project_id><text_data>1. apartments 2. 1 level 3. a)no b)yes c)yes d)no e)no f)no g)no  4. yes 5. yes 6. no 7. no</text_data><comment_date>2011-12-05T00:00:00</comment_date></row><row _id="row-bmym_jxw7_xzrr" _uuid="00000000-0000-0000-FAF6-2124B0B70162" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bmym_jxw7_xzrr"><intent_id>1117247</intent_id><project_id>915944</project_id><text_data>Transport (1) crated sculpture from storage facility to worksite in a 26 ft, climate controlled box truck, specially designed for artwork movement. Off load sculpture at worksite using 10K Outreach forklift. Uncrate sculpture using hand drills. Using drills, secure sculpture mount to pedestal. Using forklift, place sculpture into place.</text_data><comment_date>2021-01-22T00:00:00</comment_date></row><row _id="row-yufi.6wsk_8g87" _uuid="00000000-0000-0000-7AE4-C5E3E929BD44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yufi.6wsk_8g87"><intent_id>539585</intent_id><project_id>697762</project_id><text_data>Planting, Barking, Sod</text_data><comment_date>2012-10-12T00:00:00</comment_date></row><row _id="row-az2p~uzt7-uu4t" _uuid="00000000-0000-0000-11B5-FE8E92145A0F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-az2p~uzt7-uu4t"><intent_id>1191207</intent_id><project_id>986831</project_id><text_data>PO#0000005653/93354/WSU/ Freezer</text_data><comment_date>2021-11-04T00:00:00</comment_date></row><row _id="row-2fd4_r85c-zrxn" _uuid="00000000-0000-0000-BA1E-C2AAE5EECDDA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2fd4_r85c-zrxn"><intent_id>739577</intent_id><project_id>781674</project_id><text_data>Heating coil froze &amp; burst, set drying equipment (Fans, wall cavity, air scrubber &amp; Dehumidifiers), Employee&amp;#39;s extracted water.  Vehicles used box van.</text_data><comment_date>2015-12-30T00:00:00</comment_date></row><row _id="row-cv73.hu8n_f48a" _uuid="00000000-0000-0000-C9FA-5DE41377AA10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cv73.hu8n_f48a"><intent_id>791889</intent_id><project_id>803484</project_id><text_data>066046</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-awqt~5pmz_k3s7" _uuid="00000000-0000-0000-82CB-B707AA3EDF75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-awqt~5pmz_k3s7"><intent_id>880678</intent_id><project_id>840148</project_id><text_data>401K is $2.00, Medical is $1.30 and Dental is $ .15</text_data><comment_date>2017-12-22T00:00:00</comment_date></row><row _id="row-382r-z273.ccjq" _uuid="00000000-0000-0000-4077-2A0A9BD03900" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-382r-z273.ccjq"><intent_id>919176</intent_id><project_id>855008</project_id><text_data>Lakeside job# 0318033TRUCKSlowboy delivers asphalt rotomill to jobsitesweeper &amp; water truck driven to jobsite</text_data><comment_date>2018-07-18T00:00:00</comment_date></row><row _id="row-bstn.67j6~89zb" _uuid="00000000-0000-0000-59AE-8B1712D57052" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bstn.67j6~89zb"><intent_id>916656</intent_id><project_id>851759</project_id><text_data>Stevens and Mission Landscape improvements includes demolition of existing asphalt, excavating to grade, installing concrete retaining wall, install concrete sidewalk.  Our scope of work includes trenching (hand dug) for 1 drip irrigation zone no more that 18 inches deep, installing irrigation piping in said trench then backfill. Topsoil is 2-way mix spread to depth of 24&amp;quot; per plan with Ditch Witch 850 (under 90hp) and hand raking.  Installation of weed fabric, street trees and 1 gallon plantings per plan.  Installation of 1.5 inch landscape rock mulch to a depth of 3 inches using said Ditch Witch 850 (under 90hp) and shoveling and raking to grade.</text_data><comment_date>2018-07-09T00:00:00</comment_date></row><row _id="row-snzb~6ubd.zzm8" _uuid="00000000-0000-0000-C65B-A115A66DFF72" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-snzb~6ubd.zzm8"><intent_id>489093</intent_id><project_id>678181</project_id><text_data>Scope of work:  Cut out areas with sod cutters, trim beds with edger, haul away debris off site: place topsoil 4&amp;quot; depth and roto-till, plant 222 Portugal Laurel, 5 gallon.  Top dress beds with fine red bark 2&amp;quot; depth.</text_data><comment_date>2011-11-15T00:00:00</comment_date></row><row _id="row-ucwf_f5i8~y4jj" _uuid="00000000-0000-0000-13C3-FF162AE79F74" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ucwf_f5i8~y4jj"><intent_id>656596</intent_id><project_id>741717</project_id><text_data>Supply and install soil, mulch sod and plant material. Supply and install irrigation system at a depth no greater than 24 inches using trencher.</text_data><comment_date>2014-09-24T00:00:00</comment_date></row><row _id="row-zpa2~rb7t_w9m3" _uuid="00000000-0000-0000-F80C-037EF59C5B3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zpa2~rb7t_w9m3"><intent_id>880337</intent_id><project_id>839964</project_id><text_data>Job #s613703</text_data><comment_date>2017-12-21T00:00:00</comment_date></row><row _id="row-t2xt-a74s_yvm9" _uuid="00000000-0000-0000-92BB-91B5B71A4E61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t2xt-a74s_yvm9"><intent_id>627006</intent_id><project_id>733138</project_id><text_data>Supply and spread soil, install irrigation system at a depth no greater than 24&amp;quot; with trencher, Supply and install plant material, supply and spread 3&amp;quot; bark mulch in planting areas with bobcat skidster and by hand, seed lawn area.</text_data><comment_date>2014-04-28T00:00:00</comment_date></row><row _id="row-9y84~mmrw_4tff" _uuid="00000000-0000-0000-DE6F-70E165356B31" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9y84~mmrw_4tff"><intent_id>1263118</intent_id><project_id>1008345</project_id><text_data>Our general laborers unload and distribute cabinets from our delivery truck to various rooms on the jobsite. The only tools used are hand trucks and rolling carts.Our trucks are 14� and 26� box trucks for delivery of cabinets.</text_data><comment_date>2022-08-31T00:00:00</comment_date></row><row _id="row-jpyv_c7xd_amtp" _uuid="00000000-0000-0000-3B51-689E83FF7517" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jpyv_c7xd_amtp"><intent_id>685117</intent_id><project_id>758207</project_id><text_data>MirandaThompsonRepair dcuting and opertion of the heating system       single, family, 2, home, no. no,yes, no,no, no, no, no, no, no, no, no, no no nono</text_data><comment_date>2015-03-23T00:00:00</comment_date></row><row _id="row-22vm.s58s-jjdh" _uuid="00000000-0000-0000-AB6C-6965D7144E32" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22vm.s58s-jjdh"><intent_id>1216500</intent_id><project_id>1002750</project_id><text_data>This is a project for Landscape Maintenance at the Snohomish County Cathcart Operations Center in Snohomish, Washington.  Work will include mowing, line trimming, weeding, blowing of hard surfaces, raking, trash removal, leaf fall removal, edging, and pruning.  Equipment to be used will consist of walk behind mowers, line trimmers, backpack blowers, edgers, buckets, and various hand tools to complete the work for the existing beds and turf areas for the landscape maintenance contract.  This contract starts April 1, 2022 and goes through December 31, 2022.</text_data><comment_date>2022-03-09T00:00:00</comment_date></row><row _id="row-wk7s_r8pp_dgck" _uuid="00000000-0000-0000-42FD-638E4AE9BA06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wk7s_r8pp_dgck"><intent_id>798686</intent_id><project_id>790586</project_id><text_data>Filed by Jennifer Standley</text_data><comment_date>2016-10-28T00:00:00</comment_date></row><row _id="row-kegt~y2uj-gs49" _uuid="00000000-0000-0000-23D5-540ED393E786" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kegt~y2uj-gs49"><intent_id>484322</intent_id><project_id>672075</project_id><text_data>penhall job # 230650</text_data><comment_date>2011-10-18T00:00:00</comment_date></row><row _id="row-wdwz-7g34.k9c8" _uuid="00000000-0000-0000-49A9-4D6D26D26490" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wdwz-7g34.k9c8"><intent_id>1235329</intent_id><project_id>1011371</project_id><text_data>#27002</text_data><comment_date>2022-05-20T00:00:00</comment_date></row><row _id="row-cg6z_74mn-p5bd" _uuid="00000000-0000-0000-AF66-32CC50C26CEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cg6z_74mn-p5bd"><intent_id>952735</intent_id><project_id>858867</project_id><text_data>HIRING CONTRACTOR: ADK ELECTRIC INCJOBSITE: TINKHAM RD</text_data><comment_date>2018-12-31T00:00:00</comment_date></row><row _id="row-tcw3.8yxg_gfvy" _uuid="00000000-0000-0000-F5B8-906BD14DC931" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tcw3.8yxg_gfvy"><intent_id>639501</intent_id><project_id>695933</project_id><text_data>Civil/Structural Repairs 7719 W. Marginal Way SW, Seattle, WA</text_data><comment_date>2014-07-08T00:00:00</comment_date></row><row _id="row-8kkq_h3xb~yd8e" _uuid="00000000-0000-0000-3359-878761EF168F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8kkq_h3xb~yd8e"><intent_id>889677</intent_id><project_id>844359</project_id><text_data>We will mow, edge and trim the landscaping of the Three Rivers Entertainment District.  This is for general grounds maintenance.</text_data><comment_date>2018-02-22T00:00:00</comment_date></row><row _id="row-xf6b_gtig_mxp9" _uuid="00000000-0000-0000-0D78-22BEFC7119D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xf6b_gtig_mxp9"><intent_id>1357468</intent_id><project_id>1083836</project_id><text_data>S033836</text_data><comment_date>2023-08-24T00:00:00</comment_date></row><row _id="row-ahri~d5hr.97dh" _uuid="00000000-0000-0000-18DD-7FA8B9CEA65C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ahri~d5hr.97dh"><intent_id>918473</intent_id><project_id>841456</project_id><text_data>WE are a staffing company providing Associates to the contractor</text_data><comment_date>2018-07-17T00:00:00</comment_date></row><row _id="row-y3g2.6ej9-h7ff" _uuid="00000000-0000-0000-002A-88430BD065F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y3g2.6ej9-h7ff"><intent_id>855193</intent_id><project_id>830100</project_id><text_data>This is an insurance restoration project, due to water damage. We</text_data><comment_date>2017-08-16T00:00:00</comment_date></row><row _id="row-m7nn_eknp~uj7t" _uuid="00000000-0000-0000-6B28-52A404B34C38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m7nn_eknp~uj7t"><intent_id>1075583</intent_id><project_id>922426</project_id><text_data>Work order #9327475</text_data><comment_date>2020-07-27T00:00:00</comment_date></row><row _id="row-xcqe~efuw.cs63" _uuid="00000000-0000-0000-B16D-33012783F9C1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xcqe~efuw.cs63"><intent_id>1076925</intent_id><project_id>927178</project_id><text_data>PacWest Grinding Job #20-096*</text_data><comment_date>2020-07-31T00:00:00</comment_date></row><row _id="row-6a2g-knmb_rj4h" _uuid="00000000-0000-0000-2496-70C60177BC44" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6a2g-knmb_rj4h"><intent_id>909364</intent_id><project_id>852653</project_id><text_data>Employees drive either a 2500 or a 3500 Chevy Silverado to and from the job site. This work was annual preventative maintenance, change oil, oil filter, fuel filter, preform battery test, 27 point inspection and transfer test. While on site the customer requested that the battery be replaced and the connections cleaned.</text_data><comment_date>2018-06-06T00:00:00</comment_date></row><row _id="row-saqn_3ndp~2nyd" _uuid="00000000-0000-0000-7927-87B17A31DE38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-saqn_3ndp~2nyd"><intent_id>521312</intent_id><project_id>688726</project_id><text_data>Other Truck -</text_data><comment_date>2012-07-10T00:00:00</comment_date></row><row _id="row-b9nm-fdfk-fq4v" _uuid="00000000-0000-0000-9F38-C0ABFF54EE8A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9nm-fdfk-fq4v"><intent_id>839563</intent_id><project_id>788554</project_id><text_data>Tractor and modular lowboy trailer to transport portable classroom</text_data><comment_date>2017-06-16T00:00:00</comment_date></row><row _id="row-e259~923t~jsf2" _uuid="00000000-0000-0000-415F-50C62FF3CEF5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e259~923t~jsf2"><intent_id>787492</intent_id><project_id>801775</project_id><text_data>PTI SO 128464</text_data><comment_date>2016-09-06T00:00:00</comment_date></row><row _id="row-nhga-n6id-whdr" _uuid="00000000-0000-0000-8DEA-1547F16AC1BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nhga-n6id-whdr"><intent_id>784287</intent_id><project_id>800552</project_id><text_data>Truck Driver - Other: Water Truck: Kenworth T800 with 4,000 gallon tank</text_data><comment_date>2016-08-23T00:00:00</comment_date></row><row _id="row-du29_v77h.cn2a" _uuid="00000000-0000-0000-F9FD-3F5014E8F28B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-du29_v77h.cn2a"><intent_id>1097737</intent_id><project_id>937158</project_id><text_data>LONG Job # 5050.200436</text_data><comment_date>2020-10-21T00:00:00</comment_date></row><row _id="row-bhnq~ijpe-mkdk" _uuid="00000000-0000-0000-DCC3-F939F29AD49B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bhnq~ijpe-mkdk"><intent_id>909590</intent_id><project_id>852743</project_id><text_data>OTHER TRUCKS - OIL DISTRIBUTOR AND WATER TRUCK</text_data><comment_date>2018-06-07T00:00:00</comment_date></row><row _id="row-5adb~dwhp-jq2j" _uuid="00000000-0000-0000-CBE5-5F1D5C64E5D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5adb~dwhp-jq2j"><intent_id>485876</intent_id><project_id>674735</project_id><text_data>Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis Bacon wage requirements.</text_data><comment_date>2011-10-26T00:00:00</comment_date></row><row _id="row-jebu~5djf-y7gg" _uuid="00000000-0000-0000-5C32-8D79949C07A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jebu~5djf-y7gg"><intent_id>848897</intent_id><project_id>827698</project_id><text_data>THE OTHER TRUCK WILL BE A LOWBOY TRACTOR AND TRAILER USED TO HAUL HEAVY EQUIPMENT TO AND FROM THE PROJECT LOCATION.</text_data><comment_date>2017-07-20T00:00:00</comment_date></row><row _id="row-5kmk_p94y.hueh" _uuid="00000000-0000-0000-ED44-28D81DAECD40" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5kmk_p94y.hueh"><intent_id>777208</intent_id><project_id>795106</project_id><text_data>1. single head ductless hp CEEP 2. single family 3. single story 4a. no 4b. no 4c. yes 4d. no 4e. no 4f. no 4g. no 4h. no 4i. no 4j. no 4k. no 5. yes 6. yes 7. no 8.no</text_data><comment_date>2016-07-25T00:00:00</comment_date></row><row _id="row-qf5u_q64e.spxr" _uuid="00000000-0000-0000-177A-B4D45E844A18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qf5u_q64e.spxr"><intent_id>780363</intent_id><project_id>788228</project_id><text_data>419 West Main StreetLind, WA 99341</text_data><comment_date>2016-08-05T00:00:00</comment_date></row><row _id="row-b3sr-9ixb.nsij" _uuid="00000000-0000-0000-CF2D-63F6E258194E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b3sr-9ixb.nsij"><intent_id>612905</intent_id><project_id>727690</project_id><text_data>Fringes:  NWDC - $2.06; Vacation - $1.50; NW Pension - $6.93; National Pension - $4.24; Health Care - $9.78; ITI - $.17; Apprentice Fund - $1.15; Industry Fund - $.65; Org Trust - $.95; NW Supp - $.79</text_data><comment_date>2014-01-21T00:00:00</comment_date></row><row _id="row-ciws~zu6q.xazk" _uuid="00000000-0000-0000-C2CE-A119BC66C988" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ciws~zu6q.xazk"><intent_id>1023722</intent_id><project_id>900473</project_id><text_data>#1Install Floor coverings #2 Yes #3 2 #4a)No b)No C) Yes d)No e) No f) No g) No h)No i) No j) No k) No L) No #5 Yes #6 Yes #7 No #8 No</text_data><comment_date>2019-11-25T00:00:00</comment_date></row><row _id="row-a35j.s2nm.ymqc" _uuid="00000000-0000-0000-4540-A57787857795" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a35j.s2nm.ymqc"><intent_id>716980</intent_id><project_id>754885</project_id><text_data>HIRED BY SUB MALCOLM DRILLING</text_data><comment_date>2015-08-26T00:00:00</comment_date></row><row _id="row-qcsg_f64a.nzks" _uuid="00000000-0000-0000-7794-A4E6083C17E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qcsg_f64a.nzks"><intent_id>1056780</intent_id><project_id>854790</project_id><text_data>We have no knowledge of any other work going on at this job site. All work pertaining to our company is the installation of the wire partitions. The wire partitions are used to make a room into two separate spaces for whatever the customer needs.</text_data><comment_date>2020-05-21T00:00:00</comment_date></row><row _id="row-3yi8~er4e~9n9u" _uuid="00000000-0000-0000-E63B-55E86A2D1FAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3yi8~er4e~9n9u"><intent_id>470016</intent_id><project_id>670376</project_id><text_data>King County Jail Generator Improvements ProjectJob #: 2114509500 5th AvenueSeattle, WA</text_data><comment_date>2011-08-03T00:00:00</comment_date></row><row _id="row-5db9.m8cq~ycwn" _uuid="00000000-0000-0000-C5D7-ACA009DB7FD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5db9.m8cq~ycwn"><intent_id>791943</intent_id><project_id>793251</project_id><text_data>We Hydroseed one person sprays one pulls the hose.</text_data><comment_date>2016-09-26T00:00:00</comment_date></row><row _id="row-d33z-mj5t-d72m" _uuid="00000000-0000-0000-D585-860E357BBD9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d33z-mj5t-d72m"><intent_id>970943</intent_id><project_id>878143</project_id><text_data>Other truck - Mack Water Truck, gross weight 28,000 lb, for watering replanted landslide area</text_data><comment_date>2019-04-12T00:00:00</comment_date></row><row _id="row-3wk9.jzbv~8yfh" _uuid="00000000-0000-0000-C475-54C82CC2F217" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3wk9.jzbv~8yfh"><intent_id>961096</intent_id><project_id>873641</project_id><text_data>19-10-108</text_data><comment_date>2019-02-20T00:00:00</comment_date></row><row _id="row-smzz-2vmp~pvev" _uuid="00000000-0000-0000-0F7B-0CEAD9FD42F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-smzz-2vmp~pvev"><intent_id>806767</intent_id><project_id>807795</project_id><text_data>Voice &amp; data cabling</text_data><comment_date>2016-12-21T00:00:00</comment_date></row><row _id="row-bsvp~5abf~gnyp" _uuid="00000000-0000-0000-11F1-0C2121271407" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bsvp~5abf~gnyp"><intent_id>793712</intent_id><project_id>804124</project_id><text_data>scope of work to include: install edging along pathway and install medium bark to trail surface using hand tools, shovels, rakes, buckets, wheelbarrows, Ford F550 landscape truck.</text_data><comment_date>2016-10-04T00:00:00</comment_date></row><row _id="row-3bjk-4j8x~qck3" _uuid="00000000-0000-0000-B84B-FFF2BEE98307" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3bjk-4j8x~qck3"><intent_id>1204154</intent_id><project_id>994881</project_id><text_data>SR49858252</text_data><comment_date>2022-01-12T00:00:00</comment_date></row><row _id="row-2idt_kbmn.g9jk" _uuid="00000000-0000-0000-735A-591A1005455E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2idt_kbmn.g9jk"><intent_id>613018</intent_id><project_id>727577</project_id><text_data>adding in L&amp;I account number for Moncrieff Construction</text_data><comment_date>2014-01-23T00:00:00</comment_date></row><row _id="row-c6ey_ff4c-uqj5" _uuid="00000000-0000-0000-477A-681B80112945" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6ey_ff4c-uqj5"><intent_id>695738</intent_id><project_id>762788</project_id><text_data>gain access to the site for subcontractors and remove rubble and clean up of job site.  Minor hand tools, brooms etc. and truck to remove debris.</text_data><comment_date>2015-05-22T00:00:00</comment_date></row><row _id="row-gt43.pepq~ux4g" _uuid="00000000-0000-0000-D2A0-35AF8287D919" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gt43.pepq~ux4g"><intent_id>851575</intent_id><project_id>820430</project_id><text_data>Job #112285-001</text_data><comment_date>2017-08-01T00:00:00</comment_date></row><row _id="row-ur99.a8f2_h78y" _uuid="00000000-0000-0000-6A6E-AF668DAFB395" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ur99.a8f2_h78y"><intent_id>889165</intent_id><project_id>844117</project_id><text_data>Blairco Job 18-7616</text_data><comment_date>2018-02-20T00:00:00</comment_date></row><row _id="row-22t9.bwnh~wvw7" _uuid="00000000-0000-0000-247D-48CDE68790F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22t9.bwnh~wvw7"><intent_id>611875</intent_id><project_id>727287</project_id><text_data>1. residential heater repair2. single family3. 1 story4.a. Nob. Noc. Yesd-k. I have absolutely no friggin Idea, I was hired to perform a service call this is a ridiculous question to ask on a service call.6-8. N/AAny personal info will need to come from Rich Walters with Clark county.</text_data><comment_date>2014-01-13T00:00:00</comment_date></row><row _id="row-ypth.yrcb.awwa" _uuid="00000000-0000-0000-06CD-21FB9CDE8689" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ypth.yrcb.awwa"><intent_id>1070351</intent_id><project_id>924570</project_id><text_data>Sound Transit Phase 6</text_data><comment_date>2020-07-07T00:00:00</comment_date></row><row _id="row-7p4b~vp6r.y2cb" _uuid="00000000-0000-0000-EA94-8223EEEB952B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7p4b~vp6r.y2cb"><intent_id>545506</intent_id><project_id>690450</project_id><text_data>H &amp; W 7.23 PC Pen 9.48 Retirement 3.41 per Hour</text_data><comment_date>2012-11-21T00:00:00</comment_date></row><row _id="row-qra9-24ri.af66" _uuid="00000000-0000-0000-600C-0AF59C4A1D99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qra9-24ri.af66"><intent_id>1196269</intent_id><project_id>973552</project_id><text_data>Abatement of Asbestos Containing Materials Pipe for the City of Seattle South Park Drainage &amp; Roadway Partnership project,  for improvement of chronic flooding and drainage issues.</text_data><comment_date>2021-12-01T00:00:00</comment_date></row><row _id="row-5jtr_tpp8~uar6" _uuid="00000000-0000-0000-DAC4-9EAD28D6B11C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5jtr_tpp8~uar6"><intent_id>670326</intent_id><project_id>750995</project_id><text_data>Tenant improvements through Columbia Center Property LLC, Suites 1800, 1900 &amp; 2000.</text_data><comment_date>2014-12-17T00:00:00</comment_date></row><row _id="row-ykw3_a6q4-wksx" _uuid="00000000-0000-0000-2CF1-E5669F8C4F99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ykw3_a6q4-wksx"><intent_id>1213466</intent_id><project_id>1000723</project_id><text_data>9886343</text_data><comment_date>2022-02-23T00:00:00</comment_date></row><row _id="row-a8wp~jcgp_s8w8" _uuid="00000000-0000-0000-0ECE-7118398A6BB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a8wp~jcgp_s8w8"><intent_id>1219037</intent_id><project_id>999072</project_id><text_data>Pioneer Human Services Intent # 1077200 was incorrect and they had to file new L&amp;I Paperwork with correct info.  Therefore, we are also mandated to file new Intent, Refile all CP's and New Affidavit to match their corrections.</text_data><comment_date>2022-03-18T00:00:00</comment_date></row><row _id="row-js3k_f4pz-wm9t" _uuid="00000000-0000-0000-2BFE-88CC33176CE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-js3k_f4pz-wm9t"><intent_id>1283359</intent_id><project_id>1040744</project_id><comment_date>2022-11-14T00:00:00</comment_date></row><row _id="row-uxxd_7m85~ji29" _uuid="00000000-0000-0000-6D13-C7AD21EDE5CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uxxd_7m85~ji29"><intent_id>687944</intent_id><project_id>759469</project_id><text_data>1515056</text_data><comment_date>2015-04-08T00:00:00</comment_date></row><row _id="row-neef.ujxr.ynzs" _uuid="00000000-0000-0000-8844-069BBA056E07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-neef.ujxr.ynzs"><intent_id>596069</intent_id><project_id>720805</project_id><text_data>Shipyard Machinist per decision number 2014-wa-001, 3</text_data><comment_date>2014-01-22T00:00:00</comment_date></row><row _id="row-7m6i~6rxy~nbgd" _uuid="00000000-0000-0000-D952-C2302CC4BF66" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7m6i~6rxy~nbgd"><intent_id>756680</intent_id><project_id>789275</project_id><text_data>TOTAL FRINGE IS PAID TO A QUALIFIED PENSION PLAN. PLAN IS 100% VESTED AND PAID MONTHLY.</text_data><comment_date>2016-04-14T00:00:00</comment_date></row><row _id="row-i98h~vmb7~vwjt" _uuid="00000000-0000-0000-028C-92A5319B3485" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i98h~vmb7~vwjt"><intent_id>976868</intent_id><project_id>880695</project_id><text_data>Hand weeding and removal of unwanted plant material. Planting of new plants in existing planting areas and watering.</text_data><comment_date>2019-05-09T00:00:00</comment_date></row><row _id="row-m65t.6vvz.ddzh" _uuid="00000000-0000-0000-5B8E-8E074B93FE0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m65t.6vvz.ddzh"><intent_id>1217527</intent_id><project_id>1003398</project_id><text_data>1.Replace electric furnace 2. Mobile home. 3. One 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2022-03-14T00:00:00</comment_date></row><row _id="row-v4jx~i7ni-z25c" _uuid="00000000-0000-0000-C017-2C704775AB83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v4jx~i7ni-z25c"><intent_id>1000525</intent_id><project_id>886302</project_id><text_data>1190105 - Harvard Replacement Elementary School</text_data><comment_date>2019-08-19T00:00:00</comment_date></row><row _id="row-87d5-zi7t~n8n3" _uuid="00000000-0000-0000-F8C5-ADDCD628C99B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-87d5-zi7t~n8n3"><intent_id>901206</intent_id><project_id>847347</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.: Remove and replace bathroom fans, kitchen fan and add 24hr exhaust timers as well as safe-off exposed wiring in clients homes.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?: Most of the structures are mobile homes, the rest are single family.#3 - Including any basement or garage, how many stories or levels does the structure have?: single story  #4 - What is the building used for? A)No B)No C)Yes D)No E)No F)No G)No H)No I)No J)No K)No #5 - Does each dwelling unit have its own self-contained kitchen? Yes #6 - Does each dwelling unit have its own bathroom? Yes #7 - Is there a community facility or manager�s office on site? No #8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2018-04-27T00:00:00</comment_date></row><row _id="row-69im.id37~z7j4" _uuid="00000000-0000-0000-B049-9E317626CAFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-69im.id37~z7j4"><intent_id>919429</intent_id><project_id>848865</project_id><text_data>Filed by Linnie ShaverState of WA-Dept. of L&amp;I- Prevailing Wage DivisionExemption Intent Questionnaire form- UW Medicine-Valley Medical Center Level 2 D&amp;T Phase 2Prevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.) What is the specific purpose of this awarding agency�s public works project?Remodel existing building2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No 3.) Does this project entail the remodeling or new construction of a facility?Yes, but not performed by Siemens Employees.4.) If your firm is working upon a type of building system, what type of system is involved? HVAC control system5.) What specific tasks will your employees use in the performance of those tasks?Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches. 6.) What, if any, tools will your employees use in the performance of those tasks?Laptop computer7.) If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks?No - none8.) Are you going to be hiring any subcontractors for this project?YesTo expedite our evaluation, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification,� �commissioning,� or similar work, please explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2018-07-19T00:00:00</comment_date></row><row _id="row-xwrq~jvph_k8c3" _uuid="00000000-0000-0000-7767-1224185BFBA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xwrq~jvph_k8c3"><intent_id>608714</intent_id><project_id>725549</project_id><text_data>This filing covers work performed on Boiler #2, in December of 2013, and work to be performed on Boiler #1, in January of 2014.</text_data><comment_date>2013-12-17T00:00:00</comment_date></row><row _id="row-7wt7.4u6i.hxzs" _uuid="00000000-0000-0000-6982-01C82EDD1ADA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7wt7.4u6i.hxzs"><intent_id>959412</intent_id><project_id>872601</project_id><text_data>Apartment building on Elm St</text_data><comment_date>2019-02-07T00:00:00</comment_date></row><row _id="row-b84x-q2tu_ndkd" _uuid="00000000-0000-0000-A870-4F89777C51A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b84x-q2tu_ndkd"><intent_id>1027098</intent_id><project_id>899016</project_id><text_data>Filed by Moses Puris</text_data><comment_date>2019-12-16T00:00:00</comment_date></row><row _id="row-rdmt~pzze.r93s" _uuid="00000000-0000-0000-26F3-E0D27EEDA9CE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rdmt~pzze.r93s"><intent_id>1069316</intent_id><project_id>919706</project_id><text_data>We are based in Gresham, Oregon, so we have our Worker's Compensation insurance through Saif, policy #926498.</text_data><comment_date>2020-07-01T00:00:00</comment_date></row><row _id="row-xkig.vpyb.nqgj" _uuid="00000000-0000-0000-5C72-B235B9C536F3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xkig.vpyb.nqgj"><intent_id>703239</intent_id><project_id>763220</project_id><text_data>5156673</text_data><comment_date>2015-06-24T00:00:00</comment_date></row><row _id="row-y86r_3kmd.biez" _uuid="00000000-0000-0000-0635-AB86FB893A79" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y86r_3kmd.biez"><intent_id>1108659</intent_id><project_id>916539</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project?  Contractor to replace the existing undersized electric boiler at DC Shoreline        2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?   No3. Does this project entail the remodeling or new construction of a facility?   No.      4. If your firm is working upon a type of building system, what type of system is involved?   HVAC Controls       5. When is your Work to be completed?     During the project      6. What specific tasks did your employees perform?     Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.         7. What, if any, tools did your employees use in the performance of those tasks?     Laptop computer.      8. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks?    No       9. Are you going to be hiring any subcontractors for this project?     Yes.</text_data><comment_date>2020-12-09T00:00:00</comment_date></row><row _id="row-4kgj_44d5-hndc" _uuid="00000000-0000-0000-1B97-7C6701698AA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4kgj_44d5-hndc"><intent_id>979441</intent_id><project_id>881820</project_id><text_data>We pay 100% Health Premiums as part of Fringe.</text_data><comment_date>2019-05-21T00:00:00</comment_date></row><row _id="row-vzas.7a3t.6frk" _uuid="00000000-0000-0000-4DA4-6D1C0504C306" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vzas.7a3t.6frk"><intent_id>626697</intent_id><project_id>733737</project_id><text_data>Prevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:1.	What is the purpose of this project?  Asbestos Abatement Oversight2.	Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? If yes, please describe the item(s) in detail. (See WAC 296-127-010(7)(a)(vi), WAC 296-127-020 (3))  No3.	Does this project entail the remodeling or new construction of a facility?  No4.	If your firm is working upon a type of building system, what type of system is involved? Examples are: HVAC/refrigeration control system, door security access system, burglar alarm system, telecommunication cabling, etc. No5.	What specific tasks will your employees perform? The Sr. Project Manager will work with the client to ensure that technical issues are properly addressed, assist with on-site coordination, enforce specification requirements and ensure that all necessary documentation is transmitted, maintained and compiled.  The Inspection/Technician will perform the following tasks as necessary: On-site project management, including communication with project team members, building representatives and other concerned parties; Air monitoring and sample analysis; Completion of field observation reports Advise the client if the contractor is not in compliance with specifications and governing regulations; Perform post abatement visual inspections and air sampling; Compile all necessary project documentation to be maintained on-site including contractor submittals, air data and field reports.6.	What, if any, tools will your employees use in the performance of those tasks? Air monitoring pumps7.	If your employees will use no tools, will they engage in any other type of manual, hands-on efforts in completing their tasks? 8.	Are you going to be hiring any subcontractors for this project? Yes, Rhine Demolition***************************To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is �verification�, �commissioning� or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2014-04-25T00:00:00</comment_date></row><row _id="row-868n-t6kk_bbpe" _uuid="00000000-0000-0000-1575-BCEDCE4E1D7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-868n-t6kk_bbpe"><intent_id>1131903</intent_id><project_id>950728</project_id><text_data>The General Contractor 's contract provides for the improvement of SR-20 in Skagit County, MP 87.94, Fish Creek &amp; Lorenzan Creek Fish Passage by installing two buried fish passage structures, grading, stream realignment, HMA paving, pavement marking, guardrail, temporary erosion control, temporary traffic control, planting and other work. Our portion of the work is to do temporary erosion control and restore vegetation (planting). We may use a hydroseeder or tractor.</text_data><comment_date>2021-03-26T00:00:00</comment_date></row><row _id="row-7dy3~k4vv_5tmv" _uuid="00000000-0000-0000-1C7F-29E888B08717" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7dy3~k4vv_5tmv"><intent_id>657352</intent_id><project_id>716493</project_id><text_data>We are an Oregon company with temporary workers in Washington. Our Worker's Compensation Policy covers all employees working in Washington.</text_data><comment_date>2014-09-29T00:00:00</comment_date></row><row _id="row-6ppw-3tmf_fsf5" _uuid="00000000-0000-0000-FD49-DE57D6EC8420" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ppw-3tmf_fsf5"><intent_id>837820</intent_id><project_id>818475</project_id><text_data>Filed by Mary Clark</text_data><comment_date>2017-06-02T00:00:00</comment_date></row><row _id="row-pw78_5sgi_8w3g" _uuid="00000000-0000-0000-60A1-3F5896B2FA1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pw78_5sgi_8w3g"><intent_id>765221</intent_id><project_id>791902</project_id><text_data>trucking services only.  Project is construction of concrete holding tanks for stormwater</text_data><comment_date>2016-05-31T00:00:00</comment_date></row><row _id="row-iff9.4afj-eg87" _uuid="00000000-0000-0000-7E9F-6EF1D4397663" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iff9.4afj-eg87"><intent_id>1047314</intent_id><project_id>893726</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing of 1937 and 24 CFR 965.101. Workers can be  paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.Contractor elects to pay King County Prevailing Wage Rates unless the King County Prevailing Wage is lower than Davis-Bacon wage requirements for the stated crafts/trades/occupation</text_data><comment_date>2020-03-24T00:00:00</comment_date></row><row _id="row-i7as_2vkx-kn8q" _uuid="00000000-0000-0000-85EC-5B16ACDDFBC5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i7as_2vkx-kn8q"><intent_id>1190166</intent_id><project_id>976632</project_id><text_data>I will be spreading grass seed</text_data><comment_date>2021-11-02T00:00:00</comment_date></row><row _id="row-aaq6.r2vw-anf9" _uuid="00000000-0000-0000-7727-BD7807ED5A8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aaq6.r2vw-anf9"><intent_id>928497</intent_id><project_id>859770</project_id><text_data>Aphid Soil Injection administered by spray truck</text_data><comment_date>2018-08-27T00:00:00</comment_date></row><row _id="row-a974~m8u2_uzbt" _uuid="00000000-0000-0000-CCBF-C3EBFDA4E587" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a974~m8u2_uzbt"><intent_id>958317</intent_id><project_id>866398</project_id><text_data>1) Interior &amp; exterior painting. 2) Residential apartments. 3) 3 stories. 4) Residence. a) No. b) No. c) Yes. d) No. e) No. g) No. h) No. i) No. j) No. k) Yes. 5) Yes. 6) Yes. 7) No. 8) No.</text_data><comment_date>2019-02-01T00:00:00</comment_date></row><row _id="row-xia7-kain.zasu" _uuid="00000000-0000-0000-3236-6A96E30E5578" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xia7-kain.zasu"><intent_id>868986</intent_id><project_id>827661</project_id><text_data>Filed by Rachael Coe</text_data><comment_date>2017-10-13T00:00:00</comment_date></row><row _id="row-ti6f.vvjm_ctbp" _uuid="00000000-0000-0000-AF4E-8907D1F55934" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ti6f.vvjm_ctbp"><intent_id>794559</intent_id><project_id>804432</project_id><text_data>Install new boiler sections.  An old intent is on file for this job and will need to be closed out due to change in job and issuance of a new PO by Evergreen SD</text_data><comment_date>2016-10-07T00:00:00</comment_date></row><row _id="row-cj2m~arke_mp7b" _uuid="00000000-0000-0000-0474-4D51A521A016" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cj2m~arke_mp7b"><intent_id>560375</intent_id><project_id>706922</project_id><text_data>No wage listed for Industrial Engine and Machine Mechanics</text_data><comment_date>2013-03-18T00:00:00</comment_date></row><row _id="row-yjny-t5dv-redv" _uuid="00000000-0000-0000-0E39-0781D085EADC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yjny-t5dv-redv"><intent_id>1233246</intent_id><project_id>1013078</project_id><text_data>1.Install electric furnace. 2. Single family dwelling. 3. Two 4.a) no b) no c) yes d) no e) no f) no g) no h) no I) no j) no 5. Yes 6. Yes 7. No 8. No</text_data><comment_date>2022-05-12T00:00:00</comment_date></row><row _id="row-rrty.3sgh_a5gv" _uuid="00000000-0000-0000-5AC9-E6CCF3BC6B39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rrty.3sgh_a5gv"><intent_id>907413</intent_id><project_id>851887</project_id><text_data>WO #8037460</text_data><comment_date>2018-05-29T00:00:00</comment_date></row><row _id="row-wb7w_xgwg.54vi" _uuid="00000000-0000-0000-91EB-F8D52AE20EA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wb7w_xgwg.54vi"><intent_id>665965</intent_id><project_id>748920</project_id><text_data>Install a ductless heat pump. YES. 1. no. yes. no. no. no. no. no. no. no. no. no.no.</text_data><comment_date>2014-11-17T00:00:00</comment_date></row><row _id="row-xzkf.we3q~dk8w" _uuid="00000000-0000-0000-15B4-F8E077812DA4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xzkf.we3q~dk8w"><intent_id>1044281</intent_id><project_id>911779</project_id><text_data>Elect tech(06)LAN(Local Area Network)provide and install cat6 cabling for WAPsinside work</text_data><comment_date>2020-03-10T00:00:00</comment_date></row><row _id="row-y4wb_h67j~tbwc" _uuid="00000000-0000-0000-FC29-8630F5E87D3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y4wb_h67j~tbwc"><intent_id>1126627</intent_id><project_id>901178</project_id><text_data>LANDSCAPE CONSTRUCTION INCLUDES APPLYING MULCH MATERIAL TO THE JOB SITE USING A BLOWER TRUCK AND LABOR TO SPREAD TO SITE.</text_data><comment_date>2021-03-17T00:00:00</comment_date></row><row _id="row-bs53-3dvb_63b5" _uuid="00000000-0000-0000-D97F-326E6FFA2D78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bs53-3dvb_63b5"><intent_id>834714</intent_id><project_id>819263</project_id><text_data>1. TRUCK DRIVER - DRIVING TRUCK MOUNTED HYDROSEEDER AND SKID STEER2. NOZZELMAN - SPRAYING HYDROMULCHING AND OPERATING SKID STEER3. LANSCAPE LABORER - LOADING SEED, FERTILIZER, MULCH INTO MACHINE BE HAND AND CLEANINGNOTE: ALL FRINGE IS PAID TO DAVIS BACONVESTING:Prevailing wage contribution. If the work you perform for the Employer is subject to prevailing wage laws, then the Employer will make contributions to this Plan to help satisfy the fringe benefit requirements of the law. You will receive this contribution based on work you perform during a Plan Year that is subject to the law. The contribution is 100% vested PARTICIPATION:If you are working under a prevailing wage contract, then for purposes of receiving any prevailing wage contribution made to the Plan, you are eligible to participate on the date your employment is covered under the contract and will enter the Plan on that date, unless the prevailing wage contract provides otherwise.</text_data><comment_date>2017-05-17T00:00:00</comment_date></row><row _id="row-p2gb-jdee-jx4u" _uuid="00000000-0000-0000-DC5C-B3E8569DFF2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p2gb-jdee-jx4u"><intent_id>663173</intent_id><project_id>721313</project_id><text_data>Form filed by: Karol BakamusProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2014-10-30T00:00:00</comment_date></row><row _id="row-r5n3.22s5.cv3y" _uuid="00000000-0000-0000-E06C-F4092DB7D86F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r5n3.22s5.cv3y"><intent_id>968414</intent_id><project_id>877059</project_id><text_data>The Spokane Public School District will be installing the artwork that I fabricate and deliver.</text_data><comment_date>2019-03-29T00:00:00</comment_date></row><row _id="row-7sks~577u.vtfa" _uuid="00000000-0000-0000-E622-E7CBC34B5251" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7sks~577u.vtfa"><intent_id>559073</intent_id><project_id>706350</project_id><text_data>ALLIED'S JOB # 121105-0083.419</text_data><comment_date>2013-03-07T00:00:00</comment_date></row><row _id="row-rr78~ne6z-esdp" _uuid="00000000-0000-0000-9742-BE765E5F139B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rr78~ne6z-esdp"><intent_id>527692</intent_id><project_id>693577</project_id><text_data>RESIDENTIAL WEATHERIZATION PROGRAM</text_data><comment_date>2012-08-22T00:00:00</comment_date></row><row _id="row-m934_8iey-ag9s" _uuid="00000000-0000-0000-E58F-0F86B5D56CA0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m934_8iey-ag9s"><intent_id>633473</intent_id><project_id>732756</project_id><text_data>�installing &amp; terminating indoor telecom cabling�</text_data><comment_date>2014-06-11T00:00:00</comment_date></row><row _id="row-6y83-34is_w329" _uuid="00000000-0000-0000-09BA-D7B83302564B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6y83-34is_w329"><intent_id>618138</intent_id><project_id>699258</project_id><text_data>Form filed by: Mike Boyd</text_data><comment_date>2014-02-27T00:00:00</comment_date></row><row _id="row-6iam_8787.dd8y" _uuid="00000000-0000-0000-FDA7-55BCCA5BDB11" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6iam_8787.dd8y"><intent_id>937837</intent_id><project_id>855733</project_id><text_data>Our work includes only one task: to plant trees and shrubs in two locations, using hand tools. There will be no erosion control, hyrdoseeding, mulching, earth moving or any other work. Prime contractor will furnish the plants. The entire contract involves replacing two culverts.</text_data><comment_date>2018-10-04T00:00:00</comment_date></row><row _id="row-rgie-ji4g~9sqt" _uuid="00000000-0000-0000-4785-1ED1F4623965" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rgie-ji4g~9sqt"><intent_id>750091</intent_id><project_id>784674</project_id><text_data>Bath fan &amp; timer and programmable thermostat (Electric heat)Single residential home</text_data><comment_date>2016-03-07T00:00:00</comment_date></row><row _id="row-27yf_esjh~jjkk" _uuid="00000000-0000-0000-7BCB-3FC5BAF72093" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-27yf_esjh~jjkk"><intent_id>941547</intent_id><project_id>851132</project_id><text_data>HIRED BY GLOBAL CONTRACTORS LLC</text_data><comment_date>2018-10-23T00:00:00</comment_date></row><row _id="row-t9dk_ag3a.dqf9" _uuid="00000000-0000-0000-3422-0A76434F9A43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t9dk_ag3a.dqf9"><intent_id>599784</intent_id><project_id>721188</project_id><text_data>I don't see where the questions are for me to answer in this section.  this is an apartment with several residents.</text_data><comment_date>2013-10-16T00:00:00</comment_date></row><row _id="row-hi4g.jw9k-ni35" _uuid="00000000-0000-0000-40D9-AEAF157A69DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hi4g.jw9k-ni35"><intent_id>830647</intent_id><project_id>757281</project_id><text_data>Install an ELayer</text_data><comment_date>2017-05-03T00:00:00</comment_date></row><row _id="row-wxjr-bpiy_bnix" _uuid="00000000-0000-0000-DA01-EBA504250320" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wxjr-bpiy_bnix"><intent_id>1029535</intent_id><project_id>903396</project_id><text_data>1.) heat pump installation 2.) commercial structure 3.) 1 4.) county facilities management a) yes b) no c) no d) no e) no f) no g) no h) no i) no j) no k) no 5.) no 6.) yes 7.) no 8.) yes</text_data><comment_date>2020-01-02T00:00:00</comment_date></row><row _id="row-nnu9.cy4u_8aae" _uuid="00000000-0000-0000-168F-39D761EC7E0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nnu9.cy4u_8aae"><intent_id>538918</intent_id><project_id>696692</project_id><text_data>052085</text_data><comment_date>2012-10-09T00:00:00</comment_date></row><row _id="row-mbwf-fkbc~daat" _uuid="00000000-0000-0000-01BF-F6E9ED3E8C42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbwf-fkbc~daat"><intent_id>656906</intent_id><project_id>745284</project_id><text_data>Fringe BreakdownLABORERS:  $10.71H &amp; W   = $6.00Pension = $4.50Training= $0.50Trust     = $0.06OPERATORS:  $13.15H &amp; W   = $5.80Pension = $6.75Training= $0.60TEAMSTERS:  $15.19H &amp; W   = $9.14Pension = $5.80Training= $0.25</text_data><comment_date>2014-09-25T00:00:00</comment_date></row><row _id="row-nxuw~nwpm-n7fq" _uuid="00000000-0000-0000-E712-250AAC96C428" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nxuw~nwpm-n7fq"><intent_id>625814</intent_id><project_id>719707</project_id><text_data>Whole project- To build an 34,343 sq building for Washington State University located on the WSU tri cities property located in Richland, WA. The building shall be called &amp;quot;WSU Wine Science&amp;quot; and will be used for educational purposes under the direction of WSU.Our role- Beautification of the property surrounding the building. Including installation of automatic sprinklers, hydroseed application, installation of plants, metal edging, boulders and rock mulch. Trenching for sprinklers will be 18-24&amp;quot;. Rock mulch depth will be 1-2&amp;quot; per plan specification provided by general contractor. Equipment used will be walk behind trenchers, skid steer tractor and various small tools. Installation of a keystone engineered retaining wall as approved by the city of Richland. Equipment used will be the skid steer, a mini excavator and other various small hand tools.</text_data><comment_date>2014-07-17T00:00:00</comment_date></row><row _id="row-ze52.hb9c.7quz" _uuid="00000000-0000-0000-6214-F28A7E3AFB5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ze52.hb9c.7quz"><intent_id>826695</intent_id><project_id>816454</project_id><text_data>Install topsoil and new lawn.</text_data><comment_date>2017-04-14T00:00:00</comment_date></row><row _id="row-bzgg.eykw.c7ts" _uuid="00000000-0000-0000-54C1-DF6040C272F7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bzgg.eykw.c7ts"><intent_id>689022</intent_id><project_id>759960</project_id><text_data>Removal and installation of radio equipment in building on tower at the Hart Rd site.</text_data><comment_date>2015-04-14T00:00:00</comment_date></row><row _id="row-muex-pmve-4wjf" _uuid="00000000-0000-0000-425F-029C40ABBCDA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-muex-pmve-4wjf"><intent_id>869961</intent_id><project_id>785116</project_id><text_data>industrial insurance account id added</text_data><comment_date>2017-11-02T00:00:00</comment_date></row><row _id="row-sppw~bcbp-iihi" _uuid="00000000-0000-0000-013A-7863B3289CAE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sppw~bcbp-iihi"><intent_id>513838</intent_id><project_id>649039</project_id><text_data>Solo Dump Truck Rental work preformed</text_data><comment_date>2012-08-13T00:00:00</comment_date></row><row _id="row-gr62.9y4u~92tp" _uuid="00000000-0000-0000-46B1-26D50AC75BBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gr62.9y4u~92tp"><intent_id>916431</intent_id><project_id>855326</project_id><text_data>The contractors license is now renewed. Thank you</text_data><comment_date>2018-07-31T00:00:00</comment_date></row><row _id="row-hnac_6k2n_9pxq" _uuid="00000000-0000-0000-36EB-C3CC0D9B3D68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hnac_6k2n_9pxq"><intent_id>1201450</intent_id><project_id>993104</project_id><text_data>Fringes: Pension $15.03, Insurance $13.46, Training $1.27, Industry Fund $.65, Organizational Trust Fund $1.00, Clean Card $.07</text_data><comment_date>2021-12-27T00:00:00</comment_date></row><row _id="row-fg3i.xr5p.3h59" _uuid="00000000-0000-0000-BEB5-B5E5802D5CAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fg3i.xr5p.3h59"><intent_id>914196</intent_id><project_id>854472</project_id><text_data>WO #8038194</text_data><comment_date>2018-06-27T00:00:00</comment_date></row><row _id="row-imjp~7qtz-we29" _uuid="00000000-0000-0000-937F-BCDE7C8362B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imjp~7qtz-we29"><intent_id>531646</intent_id><project_id>685988</project_id><text_data>Truck Drivers / Other Trucks = Oil Distributor Truck for Paving Fabric Installation</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-zpkj.uw56-m5wd" _uuid="00000000-0000-0000-B455-706321DB1CA8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zpkj.uw56-m5wd"><intent_id>917756</intent_id><project_id>847667</project_id><text_data>0318035</text_data><comment_date>2018-07-13T00:00:00</comment_date></row><row _id="row-cdyr_tfke-qyzi" _uuid="00000000-0000-0000-1D20-A85203BDB3B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cdyr_tfke-qyzi"><intent_id>658178</intent_id><project_id>717531</project_id><text_data>C&amp;R Tractor will be providing landscaping that consists of Seeding, fertilizing and mulching which will be accomplished with a hydro-seeder</text_data><comment_date>2014-10-02T00:00:00</comment_date></row><row _id="row-bz6y_iiz3_tass" _uuid="00000000-0000-0000-9B82-06DC5D5F48A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bz6y_iiz3_tass"><intent_id>534983</intent_id><project_id>690473</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-09-24T00:00:00</comment_date></row><row _id="row-q9pt_pxt4_h4cp" _uuid="00000000-0000-0000-20FD-5F3293C18D5D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q9pt_pxt4_h4cp"><intent_id>588555</intent_id><project_id>718074</project_id><text_data>Filed by Janie Adams</text_data><comment_date>2013-08-20T00:00:00</comment_date></row><row _id="row-b9e3_irqf_xwaf" _uuid="00000000-0000-0000-E506-28ABA4913146" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9e3_irqf_xwaf"><intent_id>962094</intent_id><project_id>873367</project_id><text_data>System failure - your program does not allow for the full amount to be listed as wage.</text_data><comment_date>2019-02-26T00:00:00</comment_date></row><row _id="row-ukwc_xnzc~xagw" _uuid="00000000-0000-0000-0C66-282D595F515F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ukwc_xnzc~xagw"><intent_id>1015293</intent_id><project_id>803227</project_id><text_data>Fringe BreakdownHealth $6.50Pension $4.54Training $.90Union Dues $1.60Vacation: $1.05</text_data><comment_date>2019-11-06T00:00:00</comment_date></row><row _id="row-dxjd_3gqt-kanu" _uuid="00000000-0000-0000-867A-8A0030845609" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dxjd_3gqt-kanu"><intent_id>777813</intent_id><project_id>798076</project_id><text_data>Assist with cleanup operations from large fireHaz Waste workers to clear area of all debris, using brooms, shovels and lay boom to catch contaminated water as necessary</text_data><comment_date>2016-07-27T00:00:00</comment_date></row><row _id="row-6qhq~6yvi.sieu" _uuid="00000000-0000-0000-0AF4-1DB0D193BD19" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6qhq~6yvi.sieu"><intent_id>1286031</intent_id><project_id>1042373</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.heater repair#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure?residential single family dwelling#3 - Including any basement or garage, how many stories or levels does the structure have?single story#4 - What is the building used for? --Answer �yes� or �no� to each of the following options:(a) Any commercial use in the structure? no(b) Any retail use in the structure? no(c) Permanent residence only? yes(d) Rehabilitation house? no(e) Transitional housing? no(f) Communal dining facility? no(g) Treatment services? no(h) Assisted living services? no(I) Dormitories? no(j) Counseling? no(k) Is each room and/or bed in the structure rented separately? no(l) Other?#5 - Does each dwelling unit have its own self-contained kitchen? no#6 - Does each dwelling unit have its own bathroom? no#7 - Is there a community facility or manager�s office on site? no#8 - Is any part of the structure used by members of the public? no</text_data><comment_date>2022-11-28T00:00:00</comment_date></row><row _id="row-q7wb~vh6a.ba76" _uuid="00000000-0000-0000-14D8-FB1BB02BABE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q7wb~vh6a.ba76"><intent_id>518754</intent_id><project_id>690339</project_id><text_data>Cut invasive tree/shrubs to 6&amp;quot; off ground, scatter trimmings on site in 12&amp;quot; lengths max., apply herbicide to cut stumps. Vegetation to be cut using chainsaws and hand tools.</text_data><comment_date>2012-06-25T00:00:00</comment_date></row><row _id="row-7tu4~49vn~wkvv" _uuid="00000000-0000-0000-34CC-627B725FE038" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7tu4~49vn~wkvv"><intent_id>1265914</intent_id><project_id>1030645</project_id><text_data>Project# 03856, Bryner, Shelley, 224 W Amherst Crt, Spokane, WA 99205</text_data><comment_date>2022-09-21T00:00:00</comment_date></row><row _id="row-prbm~65kv~3tak" _uuid="00000000-0000-0000-A299-F7E8877D09AC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-prbm~65kv~3tak"><intent_id>600275</intent_id><project_id>694283</project_id><text_data>Electricians � Inside:Health: $7.45Pension: $9.46Training: $0.58Total: $17.49</text_data><comment_date>2013-10-18T00:00:00</comment_date></row><row _id="row-i6k9-dj27-w7yt" _uuid="00000000-0000-0000-2969-AEC61E1377AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i6k9-dj27-w7yt"><intent_id>543762</intent_id><project_id>699390</project_id><text_data>We are approving your form with the Landscape Construction wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-11-21T00:00:00</comment_date></row><row _id="row-fbz2.5i8j-3q4z" _uuid="00000000-0000-0000-375F-FFDBFF12D1DD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fbz2.5i8j-3q4z"><intent_id>1168984</intent_id><project_id>975048</project_id><text_data>SC 210722-0053</text_data><comment_date>2021-08-13T00:00:00</comment_date></row><row _id="row-2ts6-g6p3_ub6q" _uuid="00000000-0000-0000-348B-4326096A89A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ts6-g6p3_ub6q"><intent_id>1224399</intent_id><project_id>1007772</project_id><text_data>Our laborers used a van to go to the site and drop drying equipment on the wet gym floor.  They continued to monitor the process until 4/14 where the equipment was picked up.  They used moisture meters to do so. Pry bars and hand drills were used to remove the cove base. We subcontracted an Squire's electric to provide spider boxes for temporary power.</text_data><comment_date>2022-05-03T00:00:00</comment_date></row><row _id="row-5fmn-wnqj-t8jz" _uuid="00000000-0000-0000-F6EF-4D06F461BD16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fmn-wnqj-t8jz"><intent_id>539800</intent_id><project_id>693510</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2012-10-15T00:00:00</comment_date></row><row _id="row-wnqu~q3df~xk9p" _uuid="00000000-0000-0000-1B1B-013288B699A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wnqu~q3df~xk9p"><intent_id>1023239</intent_id><project_id>817395</project_id><text_data>Part of Intent/</text_data><comment_date>2019-11-22T00:00:00</comment_date></row><row _id="row-dwjk-i6sm_3r5b" _uuid="00000000-0000-0000-A05E-1EE863D7E1CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dwjk-i6sm_3r5b"><intent_id>778203</intent_id><project_id>798236</project_id><text_data>A. The whole project was removing flooring.B. Our part of the project was the same as above. We were the only part.C. The duties performed by the general laborers were removing flooring using floor scrapers and razer scrapers. We used a pickup truck and the debris were loaded into a Dumpster.</text_data><comment_date>2016-08-16T00:00:00</comment_date></row><row _id="row-39i9.6zq8-3u9g" _uuid="00000000-0000-0000-8057-537651493519" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39i9.6zq8-3u9g"><intent_id>772014</intent_id><project_id>791777</project_id><text_data>Replace bath fan &amp; timerSingle residential home</text_data><comment_date>2016-06-30T00:00:00</comment_date></row><row _id="row-xhnc_8d5v~wif3" _uuid="00000000-0000-0000-B45C-76261118416D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xhnc_8d5v~wif3"><intent_id>652909</intent_id><project_id>743755</project_id><text_data>1- INSULATION 2-SF DWELLING 3-1 4-DWELLING A-NO B-NO C-YES D-NO E-NO F-NO G-NO H-NO I-NO J-N/A K-N/A 6-N/A 7-NO 8-NO</text_data><comment_date>2014-09-08T00:00:00</comment_date></row><row _id="row-k4xn.gmsq.efi4" _uuid="00000000-0000-0000-3220-18F5BAA3DFDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k4xn.gmsq.efi4"><intent_id>1027615</intent_id><project_id>898741</project_id><text_data>replace bath fanssingle family1a. no  b. no  c. yes  d. no  e. no  f. no  g. no  h. no  i. no  j. no  k. no  l. NAyesyesnono</text_data><comment_date>2019-12-18T00:00:00</comment_date></row><row _id="row-hc2m.p6rh-wr56" _uuid="00000000-0000-0000-A194-41FB6D429712" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hc2m.p6rh-wr56"><intent_id>723094</intent_id><project_id>762353</project_id><text_data>Tomasa Lagunas 1524 Fair Ave #5Yakima, WA 98901#1 Install bath fan &amp; Bedroom wall heaters #2 Single Family Mobile home #3 1 story Mobile Home #4(a)no (b)no (c)yes (d)no (e)no (f)no (g)no (h)no (i)no (j)no(k)no #5 1 family dwelling kitchen #6 1 family Mobile home bathroom #7 no places #8 no public use.</text_data><comment_date>2015-09-27T00:00:00</comment_date></row><row _id="row-7e37_aqfk~se4a" _uuid="00000000-0000-0000-EF08-33964D2EDDEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7e37_aqfk~se4a"><intent_id>487056</intent_id><project_id>675805</project_id><text_data>owner preforme the work</text_data><comment_date>2011-11-02T00:00:00</comment_date></row><row _id="row-36jd-ebj6.8ara" _uuid="00000000-0000-0000-85A8-03FD456B647D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-36jd-ebj6.8ara"><intent_id>804415</intent_id><project_id>808140</project_id><text_data>Install new IDF locations. Extend Cat6 Cables and SM 6Fiber from MDF to new IDF locations. Install new racks and cable tray and patch panels as needed. All inside Cabling.</text_data><comment_date>2016-11-28T00:00:00</comment_date></row><row _id="row-ur3t~53q7-c5sv" _uuid="00000000-0000-0000-1CBC-BD5E08382765" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ur3t~53q7-c5sv"><intent_id>1357920</intent_id><project_id>1084059</project_id><text_data>LE 110101-01-01</text_data><comment_date>2023-08-25T00:00:00</comment_date></row><row _id="row-5536-rd6q-8znt" _uuid="00000000-0000-0000-4A0A-06C565CEE2D1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5536-rd6q-8znt"><intent_id>690947</intent_id><project_id>759281</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2015-04-24T00:00:00</comment_date></row><row _id="row-6izu_36vp~453r" _uuid="00000000-0000-0000-D5FD-00593438D1BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6izu_36vp~453r"><intent_id>653886</intent_id><project_id>744126</project_id><text_data>INSTALL INSULATIONSINGLE FAMILYSINGLE STORYNONOYESNONONONONONONONO</text_data><comment_date>2014-09-11T00:00:00</comment_date></row><row _id="row-cqy2~upr9.syc4" _uuid="00000000-0000-0000-51C8-BA0B408B431F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqy2~upr9.syc4"><intent_id>897576</intent_id><project_id>847896</project_id><text_data>Install HP Mini Split in Single Family Dwelling</text_data><comment_date>2018-04-09T00:00:00</comment_date></row><row _id="row-kxg9.3exe.kdm7" _uuid="00000000-0000-0000-EE75-040704CBCCC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kxg9.3exe.kdm7"><intent_id>1090154</intent_id><project_id>933595</project_id><text_data>GC SYSTEMS prior to 8/14/2020 - L&amp;I #437,261-00 / CONTRACTOR# GCSYSI913UB,NOW CIMCO-GC SYSTEMS AS OF 8/14/2020 - L&amp;I #665950-02 / CONTRACTOR# CIMCOSL807N4THIS WORK WAS PERFORMED PRIOR TO 8/14/2020.2020 CLA-VAL SERVICE - ANNUAL INSPECTION OF CLA-VAL VALVES.  CLEAN STRAINERS, EXERCISE THE VALVE, AND CHECK CALIBRATION, TO ENSURE WORKING PROPERLY.  REPLACE PARTS AS NEEDED.</text_data><comment_date>2020-10-02T00:00:00</comment_date></row><row _id="row-vwp5_gmer.khxy" _uuid="00000000-0000-0000-FFA3-D1120E4C0A5C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vwp5_gmer.khxy"><intent_id>1112026</intent_id><project_id>944738</project_id><text_data>1) Troubleshoot and repair short in timer for outside lights causing breaker to trip2) Apartment Community3) Two4) Low Income Housing;   a) No  b) No  c) Yes  d) No  e) No  f) No  g) No  h)  No  i) No  j) No  k) No  l) N/A5) Yes6) Yes7) No8) No</text_data><comment_date>2020-12-28T00:00:00</comment_date></row><row _id="row-9w82_xc6t.xzyp" _uuid="00000000-0000-0000-EAA8-61DBD9D2E153" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9w82_xc6t.xzyp"><intent_id>553986</intent_id><project_id>698596</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2013-01-30T00:00:00</comment_date></row><row _id="row-sc67_94fy~5cjd" _uuid="00000000-0000-0000-1934-15DB14694A33" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sc67_94fy~5cjd"><intent_id>595130</intent_id><project_id>720488</project_id><text_data>No.</text_data><comment_date>2013-10-16T00:00:00</comment_date></row><row _id="row-ebfj.6z32.qdt6" _uuid="00000000-0000-0000-C487-0079311F29B7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebfj.6z32.qdt6"><intent_id>599104</intent_id><project_id>721903</project_id><text_data>4815 w. clearwater #157 kennewick wa 99336</text_data><comment_date>2013-10-14T00:00:00</comment_date></row><row _id="row-4abn-um7g-3icf" _uuid="00000000-0000-0000-922A-984C803D063D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4abn-um7g-3icf"><intent_id>1044624</intent_id><project_id>911958</project_id><text_data>Contract 13559, Customer 201361/1/2020 thru 12/31/2020</text_data><comment_date>2020-03-11T00:00:00</comment_date></row><row _id="row-tkvv~bqaa_2b2j" _uuid="00000000-0000-0000-03AD-AD6E7923D99E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tkvv~bqaa_2b2j"><intent_id>517658</intent_id><project_id>688132</project_id><text_data>Job # 60608 related to # C10239</text_data><comment_date>2012-06-19T00:00:00</comment_date></row><row _id="row-239v-hhc9_iuba" _uuid="00000000-0000-0000-B6D1-C11DB74BE6F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-239v-hhc9_iuba"><intent_id>1252133</intent_id><project_id>1021355</project_id><text_data>1. Replace bath fan &amp; switch2. Single Family Dwelling3. 14. a. No; b. No; c. Yes; d. No; e. No; f. No; g. No; h. No; i. No; j. No; k. No; l. No5. Yes6. Yes7. No8. No</text_data><comment_date>2022-07-26T00:00:00</comment_date></row><row _id="row-ai25.gr6i.7uk7" _uuid="00000000-0000-0000-C962-A1AF79759C24" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ai25.gr6i.7uk7"><intent_id>452406</intent_id><project_id>487267</project_id><text_data>Installing temporary irrigation Quick coupler irrigation sys. @ 18�  max depth. Mini excavator for equipment.Installation of Compost 4� depth   Using Backhoe and walk behind tiller.Installation of soil 6�depth    equipment = backhoeInstallation of plant materialInstallation of bark mulch 2� depth</text_data><comment_date>2011-04-29T00:00:00</comment_date></row><row _id="row-ugxd.hq52_978p" _uuid="00000000-0000-0000-F385-ED346F34F376" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ugxd.hq52_978p"><intent_id>674593</intent_id><project_id>748280</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NOALL WORKED DONE IN THURSTON COUNTYRUSH604 CUSHING ST SWOLYMPIA 98502</text_data><comment_date>2015-01-14T00:00:00</comment_date></row><row _id="row-xct2_n96k_gbc4" _uuid="00000000-0000-0000-D98F-A97D2DA11E43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xct2_n96k_gbc4"><intent_id>1108816</intent_id><project_id>942942</project_id><text_data>Vertiv SID 97359, Quote Q03180601</text_data><comment_date>2020-12-09T00:00:00</comment_date></row><row _id="row-3s2y_78kk.5zgw" _uuid="00000000-0000-0000-7CBC-8410C6C7BF9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3s2y_78kk.5zgw"><intent_id>1026634</intent_id><project_id>901882</project_id><text_data>The scope of work for this project included uninstalling a microwave radio and reinstalling it with like part number, then aligning the microwave path. There was no structural work performed on the tower itself. No equipment was used, and the only tool included a ratcheting wrench.</text_data><comment_date>2019-12-26T00:00:00</comment_date></row><row _id="row-mcfe~iv2x_v9kx" _uuid="00000000-0000-0000-7740-DEC33C881968" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mcfe~iv2x_v9kx"><intent_id>1064218</intent_id><project_id>921909</project_id><text_data>TRUCK DRIVER-OTHER TRUCKS CONSIST OF LOWBOY AND WATER TRUCKSTRUCK DRIVER-DUMP TRUCKS CONSIST OF DUMP TRUCK NO TRAILERTRUCK DRIVER DUMP TRUCK AND TRAILER CONSIST OF TRACTOR PULLING TRAILER</text_data><comment_date>2020-06-10T00:00:00</comment_date></row><row _id="row-cj28-ejaw_uqcs" _uuid="00000000-0000-0000-BEDB-7664242DC9FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cj28-ejaw_uqcs"><intent_id>782507</intent_id><project_id>799819</project_id><text_data>LONG job# 5050.160230</text_data><comment_date>2016-08-16T00:00:00</comment_date></row><row _id="row-tve2.cgan_qptp" _uuid="00000000-0000-0000-5142-0DD612F72095" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tve2.cgan_qptp"><intent_id>837848</intent_id><project_id>823304</project_id><text_data>C&amp;R Tractor will be putting an irrigation system in using walk behind trenchers and hand tools.</text_data><comment_date>2017-06-02T00:00:00</comment_date></row><row _id="row-64sq-hhpz-qdmr" _uuid="00000000-0000-0000-11D5-2BAAD4520D6E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-64sq-hhpz-qdmr"><intent_id>1186927</intent_id><project_id>984436</project_id><text_data>Local Pens 13.75, Nation Pens 1.51, H&amp;W 13.09, Pref Retire H&amp;W 3.37, Train Trust 1.75, Train Trust ITF .10, PMCA .20, Scholoarship .09, Educ Reim .18, Labor Mgmt Fund .10</text_data><comment_date>2021-10-20T00:00:00</comment_date></row><row _id="row-vq74~w4wy~3uuh" _uuid="00000000-0000-0000-DD83-300FD91B9AA5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vq74~w4wy~3uuh"><intent_id>880675</intent_id><project_id>840145</project_id><text_data>Per awarding agency�s request we are breaking the project from intent #873303 into 4 parts as each of the 4 kiosks that we built are at different parks and payment will come from different budgets. We now have 4 different contract/ po #s for each.</text_data><comment_date>2017-12-22T00:00:00</comment_date></row><row _id="row-5y8a-b2fx_np5p" _uuid="00000000-0000-0000-BF7E-626ECBBAF6BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5y8a-b2fx_np5p"><intent_id>1276671</intent_id><project_id>957240</project_id><text_data>Trim trees at office, clean up debris</text_data><comment_date>2022-10-20T00:00:00</comment_date></row><row _id="row-9bnx.5pgs_prud" _uuid="00000000-0000-0000-7B2F-D6E847824478" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9bnx.5pgs_prud"><intent_id>829696</intent_id><project_id>819409</project_id><text_data>0617019</text_data><comment_date>2017-04-28T00:00:00</comment_date></row><row _id="row-scbc_i3ts.6ywg" _uuid="00000000-0000-0000-4A51-BD795D308894" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-scbc_i3ts.6ywg"><intent_id>1357083</intent_id><project_id>1060922</project_id><text_data>Job site location is E. Garland Avenue just past Barker Rd in Spokane Valley</text_data><comment_date>2023-08-23T00:00:00</comment_date></row><row _id="row-kb7y_7idz.issv" _uuid="00000000-0000-0000-E8F1-E31082D8A18A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kb7y_7idz.issv"><intent_id>889884</intent_id><project_id>843621</project_id><text_data>1000219 P&amp;I 120 volt connection to power supply, 18-2 cable , surface to mount conduit</text_data><comment_date>2018-02-23T00:00:00</comment_date></row><row _id="row-8vpx_ha7b-vh9t" _uuid="00000000-0000-0000-75DE-0C6A88F21293" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8vpx_ha7b-vh9t"><intent_id>1226679</intent_id><project_id>1009181</project_id><text_data>Technicians - still to be determinedTech1: ABTech2: GS</text_data><comment_date>2022-04-19T00:00:00</comment_date></row><row _id="row-bftu_u64m~aqs7" _uuid="00000000-0000-0000-8A99-4F5BEF69B60E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bftu_u64m~aqs7"><intent_id>988489</intent_id><project_id>855030</project_id><text_data>No fringes paid</text_data><comment_date>2019-06-28T00:00:00</comment_date></row><row _id="row-9z2g~qj5c.ee6f" _uuid="00000000-0000-0000-0CFC-260A7BF33F0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9z2g~qj5c.ee6f"><intent_id>854361</intent_id><project_id>825893</project_id><text_data>170282</text_data><comment_date>2017-08-11T00:00:00</comment_date></row><row _id="row-rsvw~kgtc_jpnj" _uuid="00000000-0000-0000-2937-998E3F3A403C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rsvw~kgtc_jpnj"><intent_id>494938</intent_id><project_id>677461</project_id><text_data>Project is exempt from state prevailing wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2012-01-12T00:00:00</comment_date></row><row _id="row-9dv4_h9r5_geu4" _uuid="00000000-0000-0000-525A-8C70F9B4DAF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9dv4_h9r5_geu4"><intent_id>838248</intent_id><project_id>816740</project_id><text_data>Fringes:  NWDC - $2.31; Vacation - $1.50; Scholarship Fund:  $.01; NW Pension - $7.98; National Pension - $4.24; Health Care - $12.32; ITI - $.17; Apprentice Fund - $1.10; Industry Fund - $.65; Org Trust - $1.00; NW Supp - $.79</text_data><comment_date>2017-06-05T00:00:00</comment_date></row><row _id="row-peqi.af5c-3uy7" _uuid="00000000-0000-0000-5D34-5C31B65B4C99" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-peqi.af5c-3uy7"><intent_id>918181</intent_id><project_id>848494</project_id><text_data>ACI Job No 18-004PacWest Job No</text_data><comment_date>2018-07-16T00:00:00</comment_date></row><row _id="row-pqbs-c6nc_8vx4" _uuid="00000000-0000-0000-8C23-442AD1DEE80D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqbs-c6nc_8vx4"><intent_id>513790</intent_id><project_id>684406</project_id><text_data>Other Truck - Lowboy - Mobilization of Equipment (Teamsters Union)</text_data><comment_date>2012-05-30T00:00:00</comment_date></row><row _id="row-j3et.5jex-48cz" _uuid="00000000-0000-0000-F79C-9D913BBB2E5F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j3et.5jex-48cz"><intent_id>847235</intent_id><project_id>775628</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2017-07-13T00:00:00</comment_date></row><row _id="row-vq3h.rfkc_c8xf" _uuid="00000000-0000-0000-14F2-5AF0E1B3EF75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vq3h.rfkc_c8xf"><intent_id>1052504</intent_id><project_id>916249</project_id><text_data>Job 20120-1</text_data><comment_date>2020-04-20T00:00:00</comment_date></row><row _id="row-rpzg~hy7f-4575" _uuid="00000000-0000-0000-9001-4CE456CC42F6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rpzg~hy7f-4575"><intent_id>493813</intent_id><project_id>680064</project_id><text_data>Laura Baumwall 4528 Eastern Ave N SEattle, WA. 98103</text_data><comment_date>2011-12-16T00:00:00</comment_date></row><row _id="row-77er_wcc4~stwq" _uuid="00000000-0000-0000-4707-3B5CBDF108A3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-77er_wcc4~stwq"><intent_id>1049405</intent_id><project_id>914621</project_id><text_data>installing a module in the phone system gateway (computer) to enable the telco circuit to connect to the gateway</text_data><comment_date>2020-04-03T00:00:00</comment_date></row><row _id="row-jzme~a7mz_wrge" _uuid="00000000-0000-0000-EA25-2463BBA0AA8B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzme~a7mz_wrge"><intent_id>817935</intent_id><project_id>814345</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Will be installing 19 exhaust bathroom fans in each apartment unit.#2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment#3 - Including any basement or garage, how many stories or levels does the structure have? 4#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? YES (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? YES#6 - Does each dwelling unit have its own bathroom? YES#7 - Is there a community facility or manager�s office on site? Yes#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2017-02-27T00:00:00</comment_date></row><row _id="row-gzhw.jgjp-a59f" _uuid="00000000-0000-0000-9BA6-BD0057FDD67F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzhw.jgjp-a59f"><intent_id>579108</intent_id><project_id>714136</project_id><text_data>86558</text_data><comment_date>2013-07-03T00:00:00</comment_date></row><row _id="row-agjg-v2tc-my26" _uuid="00000000-0000-0000-B299-B401EAB65D9D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-agjg-v2tc-my26"><intent_id>1009870</intent_id><project_id>894311</project_id><text_data>Our employee will be driving our company 1/2 ton Chevy pickup with a 17' trailer to the pick up location. It will be loaded by the contract business. He will drive the part back to our shop where it will be unloaded. If I have mis-classified please educate us on where to classification.</text_data><comment_date>2019-10-22T00:00:00</comment_date></row><row _id="row-iudt.r4xt_5b7d" _uuid="00000000-0000-0000-70AD-C06AE2B18DD8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iudt.r4xt_5b7d"><intent_id>931677</intent_id><project_id>861000</project_id><text_data>1-install ductless hp, 2-single family, 3-1, 4-no,no,yes,no,no,no,no,no,no,no,no,na 5-no, 6-no, 7-no, 8-no</text_data><comment_date>2018-09-10T00:00:00</comment_date></row><row _id="row-zmgx-h5cd-9cxp" _uuid="00000000-0000-0000-EBE9-8F713E6C308D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zmgx-h5cd-9cxp"><intent_id>1252482</intent_id><project_id>1020633</project_id><text_data>PSIPE, Rock Mulch, Sod, Shurbs R&amp;R Irrigation &amp; Mob.  Tools will include cutters, crimpers, shovels, hoes, rakes and other miscellaneous rand tools as well as a bobcat skid steer</text_data><comment_date>2022-07-26T00:00:00</comment_date></row><row _id="row-bvxd~dfid.dh78" _uuid="00000000-0000-0000-9202-4B8D7C4B5B65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bvxd~dfid.dh78"><intent_id>725379</intent_id><project_id>774273</project_id><text_data>302072</text_data><comment_date>2015-10-08T00:00:00</comment_date></row><row _id="row-qzde.fzvs~jhif" _uuid="00000000-0000-0000-3AC2-99A893FBF609" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qzde.fzvs~jhif"><intent_id>918424</intent_id><project_id>856054</project_id><text_data>BID INCLUDES: 1. Removal and haul off of existing sod. 2. Install (2) heads in the lawn area where we have some dry spots. 3. Amend 4�� of Cedar Grove compost. 4. Install Country Green�s �perfect green� sod. 5.All clean up and power wash if needed.</text_data><comment_date>2018-07-17T00:00:00</comment_date></row><row _id="row-yt7v~e4mi~qu3n" _uuid="00000000-0000-0000-F6D9-0C4D3F3A2F3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yt7v~e4mi~qu3n"><intent_id>1220837</intent_id><project_id>1005154</project_id><text_data>Scope of WorkFAR West Technologies will provide and install structured cabling for the city of Pacific.</text_data><comment_date>2022-03-25T00:00:00</comment_date></row><row _id="row-tact.qcjn-ya2y" _uuid="00000000-0000-0000-ED01-91F2AEAB88F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tact.qcjn-ya2y"><intent_id>1177210</intent_id><project_id>854037</project_id><text_data>KLB HIRED US</text_data><comment_date>2021-09-14T00:00:00</comment_date></row><row _id="row-fn7w_4nka-y25m" _uuid="00000000-0000-0000-8D12-53BB6454719C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fn7w_4nka-y25m"><intent_id>512731</intent_id><project_id>686980</project_id><text_data>Job #'s 63-82</text_data><comment_date>2012-05-18T00:00:00</comment_date></row><row _id="row-zve2-y9fx.sv6f" _uuid="00000000-0000-0000-7A84-52E279C7B1AE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zve2-y9fx.sv6f"><intent_id>886606</intent_id><project_id>842938</project_id><text_data>Darlene Crouch is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing new bathroom fans, new Panasonic energy recovery ventilator and new LED bulbs. This job meets the residential job requirements.</text_data><comment_date>2018-02-05T00:00:00</comment_date></row><row _id="row-i8gx.ikk2-89ea" _uuid="00000000-0000-0000-D211-802A9A52019F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i8gx.ikk2-89ea"><intent_id>1242151</intent_id><project_id>1018125</project_id><text_data>09-22-024R</text_data><comment_date>2022-06-17T00:00:00</comment_date></row><row _id="row-i8xd-wfs8_af8j" _uuid="00000000-0000-0000-B47A-C87A5BAA9146" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i8xd-wfs8_af8j"><intent_id>1044673</intent_id><project_id>899571</project_id><text_data>GU Job 20-050</text_data><comment_date>2020-03-11T00:00:00</comment_date></row><row _id="row-wv8a~z983-izk2" _uuid="00000000-0000-0000-37E3-1DEF5C8367EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wv8a~z983-izk2"><intent_id>688656</intent_id><project_id>759305</project_id><text_data>B) Beautification of areas adjacent to roadway the installation of trees and shrubs, topsoil &amp;lt;6&amp;quot;, bark mulch&amp;lt;6&amp;quot;, and grass.  Equip:  Bobcat, hydroseeder, hand tools.A)Highway/Road Improvements-widen and add turn lanes</text_data><comment_date>2015-04-13T00:00:00</comment_date></row><row _id="row-hdeg.mwvh_wuuh" _uuid="00000000-0000-0000-EF91-287234DBE8F9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hdeg.mwvh_wuuh"><intent_id>1265804</intent_id><project_id>1023351</project_id><text_data>Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2022-10-06T00:00:00</comment_date></row><row _id="row-89w4-zkqb~3823" _uuid="00000000-0000-0000-A0AE-7889412A6B4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-89w4-zkqb~3823"><intent_id>769990</intent_id><project_id>795102</project_id><text_data>1)We were contracted to replace the furnace and water heater 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2016-06-22T00:00:00</comment_date></row><row _id="row-gaqq~729y_3sta" _uuid="00000000-0000-0000-0A8F-5F25CE6A1B71" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gaqq~729y_3sta"><intent_id>1081410</intent_id><project_id>922255</project_id><text_data>7200020 - Fife Elementary School #4</text_data><comment_date>2020-08-19T00:00:00</comment_date></row><row _id="row-erey-8nfm_jc3m" _uuid="00000000-0000-0000-3F74-0DC88C01EB97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-erey-8nfm_jc3m"><intent_id>625297</intent_id><project_id>734677</project_id><text_data>Form filed by: Steven B Conrad</text_data><comment_date>2014-04-17T00:00:00</comment_date></row><row _id="row-n39b_fc53.bjk6" _uuid="00000000-0000-0000-B277-69B1BCDD9920" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n39b_fc53.bjk6"><intent_id>614683</intent_id><project_id>709470</project_id><text_data>Electricians � Inside:Health: $7.45Pension: $9.79Training: $0.58Total: $17.82</text_data><comment_date>2014-02-03T00:00:00</comment_date></row><row _id="row-rdi8_y92t-bjrh" _uuid="00000000-0000-0000-B5D3-40B240F31C22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rdi8_y92t-bjrh"><intent_id>1035933</intent_id><project_id>907000</project_id><text_data>? Provide and install [4] Cat6 cables to [1] new location to feed work stations.? Provide and install [1] Cat6 cable to [1] new location at work bench in hanger.? Provide and install [1] Cat6 cable to [2] new locations for WAP�s.? At the MDF, terminate on new 24 port Cat6 patch panel and wall mount bracket.? At the station, terminate with Cat6 jacks and trim out with faceplates and/or SMB.? Provide and install mud rings and fish cables through walls where possible. Install Wiremold surface mount raceway and/or EMT conduit pathway as needed.? Provide and install required cable support hardware above ceiling in mezzanine area.? Install DNR provided WAP�s.? CTS personal will utilize DNR provided man lift.? Remove old voice and data wiring.</text_data><comment_date>2020-02-04T00:00:00</comment_date></row><row _id="row-sz6b~d4kk-cfw4" _uuid="00000000-0000-0000-DA78-5C8814C14EBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sz6b~d4kk-cfw4"><intent_id>889907</intent_id><project_id>844494</project_id><text_data>Filed by Judy M Bergin</text_data><comment_date>2018-02-23T00:00:00</comment_date></row><row _id="row-3gav.8auk_uv7r" _uuid="00000000-0000-0000-BA67-623C513B533E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gav.8auk_uv7r"><intent_id>575535</intent_id><project_id>670970</project_id><text_data>PEO...DRIVES AND OPERATES VACUUM TRUCK.  FRINGE BENEFITS 2.01 PER HOUR MEDICAL DENTAL VISION AND LIFE INSURANCE.74 VACATION AND HOLIDAY PAY</text_data><comment_date>2013-06-17T00:00:00</comment_date></row><row _id="row-qb52_6qpw_fw2a" _uuid="00000000-0000-0000-BFC7-C306D27ADA06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qb52_6qpw_fw2a"><intent_id>738811</intent_id><project_id>781328</project_id><text_data>Job:  3 Sisters Site Employee will drive 3500 Silverado to/from job site</text_data><comment_date>2015-12-22T00:00:00</comment_date></row><row _id="row-hgm8_jdsg~2v2c" _uuid="00000000-0000-0000-5D23-A27D6C5E4EA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hgm8_jdsg~2v2c"><intent_id>648593</intent_id><project_id>734940</project_id><text_data>Truck F350 - 1 Ton.  Purpose:  Roadside sprayer.  Controls are inside vehicle so that the driver is spraying while vehicle moves.</text_data><comment_date>2014-08-18T00:00:00</comment_date></row><row _id="row-ri94~r87c~zw85" _uuid="00000000-0000-0000-EE39-F4F994C0F05E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ri94~r87c~zw85"><intent_id>659511</intent_id><project_id>740956</project_id><text_data>from the High School to the Theatre, and from the HIgh School to the Admin building. 24 strand 50 micron lazer optimized multi mode fiber</text_data><comment_date>2014-10-10T00:00:00</comment_date></row><row _id="row-6574.y6m3~gvra" _uuid="00000000-0000-0000-5016-B0EC90D6D833" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6574.y6m3~gvra"><intent_id>875968</intent_id><project_id>837941</project_id><text_data>Hourly Benefits - Mechanic:  NEI Welfare Plan $15.28; NEI Pension Plan $9.46; NEI Educational Fund $.60; Work Preservation Fund $.30; Holidays $1.7626; Vacation $4.7017; 401K Annuity $6.25</text_data><comment_date>2017-11-21T00:00:00</comment_date></row><row _id="row-ad5w~pzvb_y6iy" _uuid="00000000-0000-0000-4EC2-FD69802EB5AF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ad5w~pzvb_y6iy"><intent_id>462426</intent_id><project_id>469991</project_id><text_data>Awarding Agency Contact Name:  Dan CurtisAwarding Agency Contact Phone #: 206-726-8000</text_data><comment_date>2011-07-18T00:00:00</comment_date></row><row _id="row-qznw_xnmq.u6vs" _uuid="00000000-0000-0000-978B-8B80C4717FE7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qznw_xnmq.u6vs"><intent_id>982301</intent_id><project_id>880174</project_id><text_data>0919522</text_data><comment_date>2019-06-04T00:00:00</comment_date></row><row _id="row-vbci~d3v3.9jb7" _uuid="00000000-0000-0000-8161-6FD2A8976F81" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vbci~d3v3.9jb7"><intent_id>935822</intent_id><project_id>862525</project_id><text_data>Blythe PM# 1732-V06Annual Preventative Maint &amp; Service for Freezer</text_data><comment_date>2018-09-26T00:00:00</comment_date></row><row _id="row-3p6t~kbmb.3jjn" _uuid="00000000-0000-0000-E5B7-E2972AF03D69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3p6t~kbmb.3jjn"><intent_id>594564</intent_id><project_id>714116</project_id><text_data>Electricians � Inside:Health: $7.45Pension: $9.34Training: $0.58Total: $17.37</text_data><comment_date>2013-09-18T00:00:00</comment_date></row><row _id="row-2i2z-2j9e-5c8x" _uuid="00000000-0000-0000-D448-B64C4A8AE6C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2i2z-2j9e-5c8x"><intent_id>675129</intent_id><project_id>751878</project_id><text_data>1065F-39260</text_data><comment_date>2015-01-16T00:00:00</comment_date></row><row _id="row-w7hq-s65a-4zc2" _uuid="00000000-0000-0000-4B60-22598E58165A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w7hq-s65a-4zc2"><intent_id>932328</intent_id><project_id>859399</project_id><text_data>David Clark is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be doing floor repair. This job meets the residential job requirements.</text_data><comment_date>2018-09-12T00:00:00</comment_date></row><row _id="row-gy5w~6662~mnw2" _uuid="00000000-0000-0000-5DA6-1A8C80F0EBE9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gy5w~6662~mnw2"><intent_id>646544</intent_id><project_id>741311</project_id><text_data>The general laborer will be assisting with the movement and assemble of pre-fabricated of materials. The electrician will be physically mounting the mounting system to the structure and the panels to the mounting system as well as performing all electrical work.</text_data><comment_date>2014-08-07T00:00:00</comment_date></row><row _id="row-xn28.k6cj-qd66" _uuid="00000000-0000-0000-BCF6-8B3F193223D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xn28.k6cj-qd66"><intent_id>868139</intent_id><project_id>828620</project_id><text_data>TRUCKSlowboy delivers asphalt rotomill to jobsitesweeper driven to jobsite</text_data><comment_date>2017-10-10T00:00:00</comment_date></row><row _id="row-ksfi-9f9x.7bec" _uuid="00000000-0000-0000-528C-4B1E31589FE4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ksfi-9f9x.7bec"><intent_id>1160836</intent_id><project_id>970944</project_id><text_data>1)Renovation of Playfield2)Beautification of playfield through the installation of topsoil, grass and irrigation.  mini excavator &amp;lt;90 hp</text_data><comment_date>2021-07-16T00:00:00</comment_date></row><row _id="row-qqie~zetr-3yad" _uuid="00000000-0000-0000-A64D-E305FCB70BEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qqie~zetr-3yad"><intent_id>1048524</intent_id><project_id>914178</project_id><text_data>Green Effects will cleanup landscape areas, heavy pruning of trees/shrubs and remove/dispose of all debris. Green Effects will use chainsaws, blowers, pole pruners, power pruners, weedeaters, rake, shovel and wheelbarrow if needed will use mini excavator.</text_data><comment_date>2020-03-30T00:00:00</comment_date></row><row _id="row-wzww.rd2b-t4hb" _uuid="00000000-0000-0000-157D-8168DECC1CC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wzww.rd2b-t4hb"><intent_id>543266</intent_id><project_id>682468</project_id><text_data>Filed By: Karen RhinehartThis project is exempt from State Prevailing Wage requirements based on The Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis- Bacon wage requirements for the following crafts/ trades/ occupations</text_data><comment_date>2012-11-06T00:00:00</comment_date></row><row _id="row-r4wg-myx8-aizr" _uuid="00000000-0000-0000-DA2A-7CCCA5C49982" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r4wg-myx8-aizr"><intent_id>733460</intent_id><project_id>777755</project_id><text_data>#1 - Describe the work that your firm was contracted to perform.INSULATION #2 - Is the structure a single family dwelling YES, duplex, NO apartment NO, condominium NO, or other residential structure? NO #3 - Including any basement or garage, how many stories or levels does the structure have? ONE #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only?YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? NO (k) Other? NO #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? NO #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2015-12-01T00:00:00</comment_date></row><row _id="row-ps92.wzhu-g8rk" _uuid="00000000-0000-0000-D139-CBBEAB2DFFD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ps92.wzhu-g8rk"><intent_id>907290</intent_id><project_id>851832</project_id><text_data>Single family residential insulation /Weatherization upgrade</text_data><comment_date>2018-05-28T00:00:00</comment_date></row><row _id="row-ydbk-vchq~ir5u" _uuid="00000000-0000-0000-8117-9D82A7351160" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ydbk-vchq~ir5u"><intent_id>1125362</intent_id><project_id>934562</project_id><text_data>Residential Laboror on this job packed tools back and forth. Hold light for owner. hauled garbage to dump. Vehicle used was one van</text_data><comment_date>2021-03-18T00:00:00</comment_date></row><row _id="row-fpq9~ec4j~kse7" _uuid="00000000-0000-0000-8318-981851647489" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fpq9~ec4j~kse7"><intent_id>959233</intent_id><project_id>783637</project_id><text_data>Filed by Everly Bang</text_data><comment_date>2019-02-07T00:00:00</comment_date></row><row _id="row-nmiw~fejv-s6de" _uuid="00000000-0000-0000-0963-BC1A634298D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nmiw~fejv-s6de"><intent_id>678104</intent_id><project_id>755209</project_id><text_data>Robert Pasquale is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height. The home is not open to the public and does not have a business. The electricians will be installing bathroom and kitchen fans. This job meets the residential job requirements.</text_data><comment_date>2015-02-06T00:00:00</comment_date></row><row _id="row-eght~gcth_pic4" _uuid="00000000-0000-0000-0877-DFA24454E10A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eght~gcth_pic4"><intent_id>620242</intent_id><project_id>730917</project_id><text_data>Several manufactured homes within the B &amp; J City MHP		#1 - Heating duct sealing. #2 - Single family manufactured home? #3 - 1 level? #4(a) no(b) no(c) yes(d) no(e) no(f) no(g) no(h) no(i) no(j)no(k) no #5 - Yes #6 - Yes #7 - Unknown #8 - No</text_data><comment_date>2014-03-14T00:00:00</comment_date></row><row _id="row-thxi-bwte-tnnt" _uuid="00000000-0000-0000-E422-24CA975FCE0B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-thxi-bwte-tnnt"><intent_id>520038</intent_id><project_id>677271</project_id><text_data>Form filed by: Charles C. Bolz - looe235</text_data><comment_date>2012-07-02T00:00:00</comment_date></row><row _id="row-yr5r_9bsu.v3ys" _uuid="00000000-0000-0000-46CF-B85DD6FAA394" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yr5r_9bsu.v3ys"><intent_id>478651</intent_id><project_id>673823</project_id><text_data>Carolyn Terry112 E. GibsonOakville WA   P.O. #20617   Job #1175068</text_data><comment_date>2011-09-16T00:00:00</comment_date></row><row _id="row-6ft5_xv4r-6qvs" _uuid="00000000-0000-0000-3F4E-BA589A4E7701" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6ft5_xv4r-6qvs"><intent_id>661870</intent_id><project_id>747260</project_id><text_data>Filed by Signa Wagner</text_data><comment_date>2014-10-23T00:00:00</comment_date></row><row _id="row-9kcc-w699.mntu" _uuid="00000000-0000-0000-D8D1-FCDDAA6251A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9kcc-w699.mntu"><intent_id>800344</intent_id><project_id>806749</project_id><text_data>Remove 13lf of base molding and 13lf of sheetrock - We will not be replacing any materials, it is removal only</text_data><comment_date>2016-11-08T00:00:00</comment_date></row><row _id="row-rk8v_t8td-3r4s" _uuid="00000000-0000-0000-3D4D-CA4AFD5C8877" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rk8v_t8td-3r4s"><intent_id>1317154</intent_id><project_id>1061846</project_id><text_data>***SELF-INSURED***GENERAL LABORER: Performs work of shoveling with a hand shovel, cleaning/sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket and hand broom.OTHER TRUCKS: A Low Boy trailer used for delivery and pickup of equipment. A 2018 Kenworth tack truck 2,000 gallon. 2005/2006 Freightliner Water Trucks 4,000 gallon</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-mydt.tqmt.29ns" _uuid="00000000-0000-0000-F88F-BC6AD0E80BDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mydt.tqmt.29ns"><intent_id>1156538</intent_id><project_id>960275</project_id><text_data>0921525</text_data><comment_date>2021-06-29T00:00:00</comment_date></row><row _id="row-rms4~hf4v~4fzi" _uuid="00000000-0000-0000-3CEC-C3304CCE945C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rms4~hf4v~4fzi"><intent_id>578285</intent_id><project_id>713614</project_id><text_data>Owner will be working on job as Carpenter and Supervisor.</text_data><comment_date>2013-06-28T00:00:00</comment_date></row><row _id="row-pk6y_kngd_y6j7" _uuid="00000000-0000-0000-47E5-6875E64AA0AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pk6y_kngd_y6j7"><intent_id>1277016</intent_id><project_id>1013952</project_id><text_data>BASKETBALL COURT SURFACING APPX 75� x 43�- SECTION 02779:Flood court surface. Mark low areas that hold water over the depth of a nickel. Proper slope must be present to alleviate� High pressure-wash the entire court surface as needed.� Patch and repair low areas, fill *cracks.� Apply one coat of Acrylic Resurfacer to the entire court surface.� Apply two textured Color Filler coats to the entire court surface.� Apply one textured Color Finish coat to the entire court surface.� Basketball lines will be accurately laid out, taped, primed and painted with two coats White Textured Line Paint.</text_data><comment_date>2022-10-21T00:00:00</comment_date></row><row _id="row-h2hm-a62m_cya8" _uuid="00000000-0000-0000-E5C9-0DA7D4B65755" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h2hm-a62m_cya8"><intent_id>866639</intent_id><project_id>834128</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-10-03T00:00:00</comment_date></row><row _id="row-q2jf-i5ie-cp7c" _uuid="00000000-0000-0000-B3A3-68D7EE0B29B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-q2jf-i5ie-cp7c"><intent_id>740497</intent_id><project_id>780947</project_id><text_data>Parades    600.00  3.25 hrs       Kaser 650   3.5 hrs</text_data><comment_date>2016-01-06T00:00:00</comment_date></row><row _id="row-b9x5~v8ge_izkh" _uuid="00000000-0000-0000-6B98-39F137C3F245" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9x5~v8ge_izkh"><intent_id>770196</intent_id><project_id>792679</project_id><text_data>Job # 170159Other Truck : Oil Disbursement Truck</text_data><comment_date>2016-06-22T00:00:00</comment_date></row><row _id="row-pqbr-phe6.fbqv" _uuid="00000000-0000-0000-7F1E-685F2A19A97C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqbr-phe6.fbqv"><intent_id>1044422</intent_id><project_id>911844</project_id><text_data>9843297</text_data><comment_date>2020-03-10T00:00:00</comment_date></row><row _id="row-5zci_xcp4-aaxh" _uuid="00000000-0000-0000-0A5E-EE4554E46C4A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5zci_xcp4-aaxh"><intent_id>947512</intent_id><project_id>854669</project_id><text_data>HVAC work for Hidden River Middle School Expansion including:Ductwork &amp; accessories as scheduledGRDs as scheduled8 fans3 roof hoods4 electric heaters1 duct heater1 boiler stack (TRU stack, Pipe fireoff)14 welded angle iron stands for vertical heat pumpsShop drawings (Prime handling)Submittal data (Prime handling)Start &amp; Test of provided HVAC equipment (TRU)Commissioning support (TRU)O&amp;M data (Prime handling)As built drawingsOwner Training</text_data><comment_date>2018-11-27T00:00:00</comment_date></row><row _id="row-erij_5bxa-tghf" _uuid="00000000-0000-0000-2D5E-A0177A089734" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-erij_5bxa-tghf"><intent_id>693522</intent_id><project_id>761845</project_id><text_data>Tech support Ref # 150424-000755. 4/28/15 T132 Spoke with chambercain tech support, their suggestion was to disconnect wireless rcvr for now and see if the problem stops. Could be a local device with same frequency causing the issue. If so we will need to install a different rcvr. If problem continues, it is either a keypad issue or the main board, or programming.4/30/15 Pat said their Maintenance person was working on the gate today and they no longer need a tech out today. They may still need service but not today.</text_data><comment_date>2015-05-08T00:00:00</comment_date></row><row _id="row-56xz~y85p_i5u5" _uuid="00000000-0000-0000-6AD9-24059EE01B2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-56xz~y85p_i5u5"><intent_id>1110171</intent_id><project_id>943212</project_id><text_data>CONCRETE READY MIX</text_data><comment_date>2020-12-16T00:00:00</comment_date></row><row _id="row-t4xn~hw5h~usax" _uuid="00000000-0000-0000-708A-571AB3E645C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t4xn~hw5h~usax"><intent_id>541653</intent_id><project_id>696555</project_id><text_data>No Notes.</text_data><comment_date>2012-10-25T00:00:00</comment_date></row><row _id="row-kcq3.5n46~vp93" _uuid="00000000-0000-0000-64A9-7F7505DBD15C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kcq3.5n46~vp93"><intent_id>685818</intent_id><project_id>758508</project_id><text_data>Replace Video Surveillance Cameras at Public Safety Building</text_data><comment_date>2015-03-26T00:00:00</comment_date></row><row _id="row-n9j7~q2ek-x8nd" _uuid="00000000-0000-0000-C251-EF29E086B8D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n9j7~q2ek-x8nd"><intent_id>851226</intent_id><project_id>823899</project_id><text_data>HIRED BY KASSEL &amp; ASSOC</text_data><comment_date>2017-07-31T00:00:00</comment_date></row><row _id="row-i6hx~ungt~az4y" _uuid="00000000-0000-0000-8134-C05944F3A82F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i6hx~ungt~az4y"><intent_id>817395</intent_id><project_id>810869</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2017-02-24T00:00:00</comment_date></row><row _id="row-c8uz~8dtt-dwqh" _uuid="00000000-0000-0000-EC96-D0217A1EA51C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c8uz~8dtt-dwqh"><intent_id>1246931</intent_id><project_id>1003085</project_id><text_data>We are a temporary labor service agency and are therefore exempt in obtaining a contractor�s license.</text_data><comment_date>2022-07-07T00:00:00</comment_date></row><row _id="row-c7fz~cwdu_sk3n" _uuid="00000000-0000-0000-6031-6CA109AE03AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c7fz~cwdu_sk3n"><intent_id>727411</intent_id><project_id>773846</project_id><text_data>INDUSTRIAL INSURANCE NUMBER IS 821,436-01PREPARE SURFACE OF AREA TO INSTALL PLAYGROUND EQUIPMENT AND INSTALL PLAYGROUND EQUIPMENT</text_data><comment_date>2015-11-02T00:00:00</comment_date></row><row _id="row-z8uu_snej~hhas" _uuid="00000000-0000-0000-FDC8-383F5272863D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-z8uu_snej~hhas"><intent_id>662742</intent_id><project_id>747607</project_id><text_data>Tractor with 40' flatbed for hauling material &amp; equipment to and from job</text_data><comment_date>2014-10-30T00:00:00</comment_date></row><row _id="row-3snd.c4pt_j5q5" _uuid="00000000-0000-0000-6CDC-3723C1ED5F97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3snd.c4pt_j5q5"><intent_id>533342</intent_id><project_id>692060</project_id><text_data>Work will consist of installing irrigation lines to depths no deeper than 18 inches, and raking and spreading of topsoil with a maximum depth pf 6 inches. We will be planting plants and spreading bark mulch. various hand tools including shovels and rakes will be used. All equipment will be owner operated.</text_data><comment_date>2012-09-09T00:00:00</comment_date></row><row _id="row-c9sh~sy7q_j43b" _uuid="00000000-0000-0000-8BB6-D9EA24261AAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9sh~sy7q_j43b"><intent_id>1032740</intent_id><project_id>905167</project_id><text_data>#1-We were contracted to fix the furnace. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2020-01-20T00:00:00</comment_date></row><row _id="row-3n5m.g2hp~npk5" _uuid="00000000-0000-0000-B4F6-7C5BE72A6B0A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3n5m.g2hp~npk5"><intent_id>1165282</intent_id><project_id>960468</project_id><text_data>#1 - unload product from truck and spread around site#2 - Apartment#3 - 4#4 - (a) no, (b) no, (c) no (d) no, (e) no, (f) no, (g) no, (h) no, (i) no, (j) no, (k) no, (l) none#5 - yes#6 - yes#7 - yes#8 - yes</text_data><comment_date>2021-08-02T00:00:00</comment_date></row><row _id="row-8ixm.yqtf~m68q" _uuid="00000000-0000-0000-D66F-AB532D84367E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8ixm.yqtf~m68q"><intent_id>627383</intent_id><project_id>688819</project_id><text_data>***This form is being approved on the basis of your statement that your employee(s) perform no tasks that are considered the work of a laborer, worker, or mechanic contained in the prevailing wage statutes and rules. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2014-05-06T00:00:00</comment_date></row><row _id="row-96vx.qaw6_85ni" _uuid="00000000-0000-0000-0A40-05ED248382DF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-96vx.qaw6_85ni"><intent_id>646510</intent_id><project_id>741304</project_id><text_data>travelling waxer/shampooer = .25 FTE</text_data><comment_date>2014-08-07T00:00:00</comment_date></row><row _id="row-4g7c-fwiy~9kv5" _uuid="00000000-0000-0000-E722-96D9B9E57A4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4g7c-fwiy~9kv5"><intent_id>643458</intent_id><project_id>736714</project_id><text_data>All wages are paid to the employee and not as fringes</text_data><comment_date>2014-08-21T00:00:00</comment_date></row><row _id="row-5uhj.xfec.7bpp" _uuid="00000000-0000-0000-9050-0C9BC3D64094" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5uhj.xfec.7bpp"><intent_id>835896</intent_id><project_id>822496</project_id><text_data>1. Remove existing flooring and install new laminate flooring2. Single family dwelling3. 1 level4a. no4b. no4c. yes4d. no4e. no4f. no4g. no4h. no4i. no4j. no4k. no4l. single family residence5. yes6. yes7. no8. no</text_data><comment_date>2017-05-23T00:00:00</comment_date></row><row _id="row-f7nm.dgf7-2x5k" _uuid="00000000-0000-0000-9FCE-531147C734AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f7nm.dgf7-2x5k"><intent_id>506002</intent_id><project_id>579492</project_id><text_data>TRUCK DRIVER OTHER IS USED FOR TRUCK MOUNTED PICKUP SWEEPER</text_data><comment_date>2012-03-30T00:00:00</comment_date></row><row _id="row-vn5z~8994-gtkv" _uuid="00000000-0000-0000-9906-FF6F09BC2138" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vn5z~8994-gtkv"><intent_id>982803</intent_id><project_id>827407</project_id><text_data>Owner/Operator</text_data><comment_date>2019-06-06T00:00:00</comment_date></row><row _id="row-c7as-d36z.6vfg" _uuid="00000000-0000-0000-3F88-0A7B0D0E7358" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c7as-d36z.6vfg"><intent_id>584369</intent_id><project_id>713242</project_id><text_data>Kenworth T800 4 axle truck with 3 axle end dump</text_data><comment_date>2013-07-30T00:00:00</comment_date></row><row _id="row-9g6n~da97.xiy6" _uuid="00000000-0000-0000-ED77-3A175791B0B6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9g6n~da97.xiy6"><intent_id>585328</intent_id><project_id>715250</project_id><text_data>TRUCK DRIVER OTHER- TRUCK MOUNTED PICK UP SWEEPER</text_data><comment_date>2013-08-02T00:00:00</comment_date></row><row _id="row-mbju-rrkq-g3dy" _uuid="00000000-0000-0000-7B9B-5FC1BB1E54B3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbju-rrkq-g3dy"><intent_id>1033025</intent_id><project_id>905312</project_id><text_data>Water extraction, Drying and cleaning will be performed. Demolition to remove moisture impacted materials may take place as wel. Laborers and Carpenters</text_data><comment_date>2020-01-21T00:00:00</comment_date></row><row _id="row-4p8x~85gg~dff4" _uuid="00000000-0000-0000-B0D2-1B099450F9A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4p8x~85gg~dff4"><intent_id>647389</intent_id><project_id>736998</project_id><text_data>Collect soil samplesGeneral Laborer to collect soil samples</text_data><comment_date>2014-08-12T00:00:00</comment_date></row><row _id="row-7qbp~k7h9.pvhh" _uuid="00000000-0000-0000-BB3F-6A3D465360ED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7qbp~k7h9.pvhh"><intent_id>1128228</intent_id><project_id>946708</project_id><text_data>1. What is the specific purpose of this awarding agency�s public works project?   Airport Way Center Building E mechanical equipment replacement and upgrades.                 2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?   No     3. Does this project entail the remodeling or new construction of a facility?   No.      4. If your firm is working upon a type of building system, what type of system is involved?  HVAC Control System.        5. When is your Work to be completed?     During the project6. What specific tasks did your employees perform?    Siemens� BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.        7. What, if any, tools did your employees use in the performance of those tasks?     Laptop computer.      8. If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks?    No � none.      9. Are you going to be hiring any subcontractors for this project?     Yes.   Epic Electric</text_data><comment_date>2021-03-11T00:00:00</comment_date></row><row _id="row-8qhm~gjar-h5ih" _uuid="00000000-0000-0000-9444-8B433463100D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8qhm~gjar-h5ih"><intent_id>699017</intent_id><project_id>764176</project_id><text_data>1.	Prime Contractor:  		Tub Cove Inc.7801 Lake City Way NESeattle, WA  98115Contractor# TUBCOCi91BKUBI 6029402342.	University of Washington (Hiring entity�.not a contractor)Contact: Graham Sherwood Housing &amp; Food Service/Purchasing PH  206-685-9074Job Site Address:Laurel Village			Blakely Village 4200 Mary Gates Way		4747 30th Ave NESeattle, WA `			Seattle, WA 3.	Work Description:  Removing old bath surround; prepping walls in make ready condition to prepare for installation of new Tub Cove laminate surround.  Install Tub Cove laminate surround. 4.	Type of Structure:  Structure is a single family residential apartment.5.	Structure stories or levels:  Stories or levels varies.  The large percentage of the structures are 4-plex family housing.  Some buildings are 2 story duplex housing. 6.	Building Use:  Buildings are used for student family housing.7.	Answer �yes� or �no�a.	No.- commercial use in structure b.	No. retail use in structurec.	No. Permanent residenced.	No-Rehab housee.	No-Transitional housing f.	No-Communal dining facilityg.	No-Treatment servicesh.	No-Assisted living i.	No-Dormitoriesj.	No-Counselingk.	No-separate room/bed rental l.	No-other services/usesm.	Yes. Each unit has its own self-contained kitchen n.	Yes-each dwelling unit has its own bathroom o.	Yes-there is a community facility or manager�s office on site p.	No-No part of structures are used by member of the general public</text_data><comment_date>2015-06-08T00:00:00</comment_date></row><row _id="row-u4kq-p5qw_ns9v" _uuid="00000000-0000-0000-B2DC-F76CC665BFC4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u4kq-p5qw_ns9v"><intent_id>1318194</intent_id><project_id>1062505</project_id><comment_date>2023-04-10T00:00:00</comment_date></row><row _id="row-e95u.4usq_rj8x" _uuid="00000000-0000-0000-FD9D-92ACA2AC6FB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e95u.4usq_rj8x"><intent_id>1209594</intent_id><project_id>998386</project_id><text_data>PO# 02292266WOID#: 39152</text_data><comment_date>2022-02-07T00:00:00</comment_date></row><row _id="row-98bg~ufzf~eni6" _uuid="00000000-0000-0000-2DD9-2B046354BA6D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-98bg~ufzf~eni6"><intent_id>1031909</intent_id><project_id>904704</project_id><text_data>#1-We were contracted to repair the electrical. #2-Single Family Dwelling. #3-1. #4-Residential home. A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, #5-No, #6-No, #7-No, #8-No.</text_data><comment_date>2020-01-15T00:00:00</comment_date></row><row _id="row-e8id-bef4.ncvm" _uuid="00000000-0000-0000-3B85-6E42AFC44008" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e8id-bef4.ncvm"><intent_id>760287</intent_id><project_id>791201</project_id><text_data>Job # 8013456</text_data><comment_date>2016-05-04T00:00:00</comment_date></row><row _id="row-pgmk~2jmy-cbe8" _uuid="00000000-0000-0000-4AE2-AF9E66C9BB98" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pgmk~2jmy-cbe8"><intent_id>497123</intent_id><project_id>681338</project_id><text_data>job #1065F-36194</text_data><comment_date>2012-01-16T00:00:00</comment_date></row><row _id="row-zhzi.bet6~5y4q" _uuid="00000000-0000-0000-4B36-0C8CFDB19A92" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zhzi.bet6~5y4q"><intent_id>632914</intent_id><project_id>723014</project_id><text_data>Electricians � Inside:Health: $7.45Pension: $9.79Training: $0.58Total: $17.82</text_data><comment_date>2014-06-03T00:00:00</comment_date></row><row _id="row-i3gq~5hgh.iig4" _uuid="00000000-0000-0000-58FF-C8C0CF407DB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-i3gq~5hgh.iig4"><intent_id>510425</intent_id><project_id>687047</project_id><text_data>Boilermaker Journey Level Fringe Package (per hour):  Health &amp; Welfare $8.57, Pension $12.30, Apprenticeship $0.75, Promo $0.34, Annuity $1.00, Vacation $3.00</text_data><comment_date>2012-05-03T00:00:00</comment_date></row><row _id="row-e7b2~gcx8_hfk2" _uuid="00000000-0000-0000-1C9A-808A49F5DFB8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e7b2~gcx8_hfk2"><intent_id>1254046</intent_id><project_id>1024495</project_id><text_data>2280156</text_data><comment_date>2022-08-01T00:00:00</comment_date></row><row _id="row-hiqe-8rzt.yq4p" _uuid="00000000-0000-0000-F888-C0C3B4C9D218" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hiqe-8rzt.yq4p"><intent_id>1229954</intent_id><project_id>1002957</project_id><text_data>We will be installing irrigation, trees, shrubs and sod in the lawn areas</text_data><comment_date>2022-04-30T00:00:00</comment_date></row><row _id="row-8upc.6mf2.qii4" _uuid="00000000-0000-0000-F3B3-673C2487C2F2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8upc.6mf2.qii4"><intent_id>1221344</intent_id><project_id>915944</project_id><comment_date>2022-03-28T00:00:00</comment_date></row><row _id="row-7d8y~er9j~8f4p" _uuid="00000000-0000-0000-8293-4A1777EB2CAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7d8y~er9j~8f4p"><intent_id>943509</intent_id><project_id>864228</project_id><text_data>We will be using a side or belly dump with a tractor.</text_data><comment_date>2018-11-20T00:00:00</comment_date></row><row _id="row-g2i2_p7jt_3pc2" _uuid="00000000-0000-0000-63C4-EAE613CE920A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g2i2_p7jt_3pc2"><intent_id>826189</intent_id><project_id>814993</project_id><text_data>did correction made a mistake on industrial insurance acct number</text_data><comment_date>2017-04-14T00:00:00</comment_date></row><row _id="row-ahwz~v6ne-i3ns" _uuid="00000000-0000-0000-868C-D06C30F02968" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ahwz~v6ne-i3ns"><intent_id>630268</intent_id><project_id>735205</project_id><text_data>1.  repair ducts2.  single family3.  14.  a. no b. no c. yes d. no e. no f. no g. no h. no i . no j. no5.  yes, only one dwelling unit6.  yes, only one dwelling unit7.  no.8.  no</text_data><comment_date>2014-05-19T00:00:00</comment_date></row><row _id="row-ttzk~iy6k~63hn" _uuid="00000000-0000-0000-394F-061470C74968" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ttzk~iy6k~63hn"><intent_id>1177555</intent_id><project_id>979299</project_id><text_data>tech 1 2 hourstech 2 2 hours</text_data><comment_date>2021-09-15T00:00:00</comment_date></row><row _id="row-nun4~su5d.3m64" _uuid="00000000-0000-0000-C079-0DDE3ACA9DEB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nun4~su5d.3m64"><intent_id>470187</intent_id><project_id>671564</project_id><text_data>Prairie Electric, Inc.�s fringe packages only include Health Plan, Vacation Plan, Holiday Plan, Pension Plan, and Apprentice Program.</text_data><comment_date>2011-08-04T00:00:00</comment_date></row><row _id="row-w3dr~f446_avwk" _uuid="00000000-0000-0000-02ED-DB8C690E157F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w3dr~f446_avwk"><intent_id>797692</intent_id><project_id>805633</project_id><text_data>PTI SO 128473</text_data><comment_date>2016-10-24T00:00:00</comment_date></row><row _id="row-beh8.kzdu~9cwc" _uuid="00000000-0000-0000-65F8-330687DC767E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-beh8.kzdu~9cwc"><intent_id>610330</intent_id><project_id>715507</project_id><text_data>Owner</text_data><comment_date>2014-01-01T00:00:00</comment_date></row><row _id="row-c7bm_kkfk~8kjb" _uuid="00000000-0000-0000-1102-E3002CD29C2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c7bm_kkfk~8kjb"><intent_id>1226150</intent_id><project_id>952381</project_id><text_data>Owner Operaor</text_data><comment_date>2022-04-16T00:00:00</comment_date></row><row _id="row-uis2-hfhb.ag4v" _uuid="00000000-0000-0000-7105-E6B8F1DC9753" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uis2-hfhb.ag4v"><intent_id>614341</intent_id><project_id>721038</project_id><text_data>Construction of concrete skate park and Landscaping in Daubenspeck Skate park  Bingen WA. Our part of this project is help the hiring contractor to  spreading 120 yard of top soil, installation of sprinkler system and Installation of sod. equipment that we are going to used to performed our part is a mini loader for spread the top soil, trencher for sprinkler system.</text_data><comment_date>2014-02-03T00:00:00</comment_date></row><row _id="row-zyg4.epnm_v9r9" _uuid="00000000-0000-0000-0E6D-69B7DC9A5F07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zyg4.epnm_v9r9"><intent_id>722288</intent_id><project_id>761391</project_id><text_data>Roofer Fringe:Health &amp; Dental $2.38 and Davis Bacon Pension Fund $4.80</text_data><comment_date>2015-09-23T00:00:00</comment_date></row><row _id="row-jmc9.nnae_qavr" _uuid="00000000-0000-0000-8376-D5771997853B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jmc9.nnae_qavr"><intent_id>998048</intent_id><project_id>889656</project_id><text_data>Order 998755</text_data><comment_date>2019-08-08T00:00:00</comment_date></row><row _id="row-b9b2~xab3~famd" _uuid="00000000-0000-0000-AFE7-AD72BEAC6C48" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9b2~xab3~famd"><intent_id>813970</intent_id><project_id>812553</project_id><text_data>City Center Parking US45039 01-01-17 thru 12-31-17</text_data><comment_date>2017-02-01T00:00:00</comment_date></row><row _id="row-ujzz~3sgs.rawx" _uuid="00000000-0000-0000-669E-D72E0F678045" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ujzz~3sgs.rawx"><intent_id>1236861</intent_id><project_id>1011450</project_id><text_data>'Stone Mason' rate for template and installation employeesAll shop labor and fabrication was done in Post Falls Idaho'Truck Driver - other' covers labor to deliver finished countertops from fabrication plant to jobsite.  Driver is installer and vehicle is Ford Transit van.</text_data><comment_date>2022-05-26T00:00:00</comment_date></row><row _id="row-ci3b.msrz-9rvw" _uuid="00000000-0000-0000-096E-FB7A5CA0B01A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ci3b.msrz-9rvw"><intent_id>1418458</intent_id><project_id>1039861</project_id><text_data>25AD2135</text_data><comment_date>2024-04-11T00:00:00</comment_date></row><row _id="row-6cvh_294r.jh2k" _uuid="00000000-0000-0000-CE07-F24936A4B148" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6cvh_294r.jh2k"><intent_id>608442</intent_id><project_id>725593</project_id><text_data>#1. Residential insulation#2. Single family dwelling#3.  1#4. Residencea. no, b. no, c. yes, d. no, e. no, f. no, g. no, h. no, i. no, j. no, k. no#5. yes#6. yes#7. no#8. no</text_data><comment_date>2013-12-13T00:00:00</comment_date></row><row _id="row-x84i.dc7k_txbf" _uuid="00000000-0000-0000-B1BD-8BF4E26D979E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x84i.dc7k_txbf"><intent_id>691965</intent_id><project_id>760087</project_id><text_data>REPLACE MARMOLEUM IN PART OF BATHROOM, INSTALL RUBBER BASE</text_data><comment_date>2015-04-30T00:00:00</comment_date></row><row _id="row-4x3j~64tt~ifdc" _uuid="00000000-0000-0000-5CCA-DF9ED01DD9D6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4x3j~64tt~ifdc"><intent_id>588746</intent_id><project_id>718146</project_id><text_data>Elect Tech (06)  Provide labor to trouble shoot fiber for the portable.  Work will be performed indoors and outdoors.</text_data><comment_date>2013-08-20T00:00:00</comment_date></row><row _id="row-mvhy_v4xh-9fhn" _uuid="00000000-0000-0000-18F1-1FCF0C519E9A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mvhy_v4xh-9fhn"><intent_id>559012</intent_id><project_id>703455</project_id><text_data>Fringe Breakdown:$16.94--$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $9.94 Pension$16.81--$5.00 Medical, $1.00 Vacation, $1.00 Holiday, $9.81 Pension</text_data><comment_date>2013-03-07T00:00:00</comment_date></row><row _id="row-whgg_wwm7_zmin" _uuid="00000000-0000-0000-F749-07298E9C960F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-whgg_wwm7_zmin"><intent_id>453341</intent_id><project_id>664419</project_id><text_data>Sharon Largin</text_data><comment_date>2011-04-28T00:00:00</comment_date></row><row _id="row-pesy_zae8-64vj" _uuid="00000000-0000-0000-8918-96DA8C2BB9FA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pesy_zae8-64vj"><intent_id>680086</intent_id><project_id>753604</project_id><text_data>2 Flaggers per day for possibly more than 1 day</text_data><comment_date>2015-02-19T00:00:00</comment_date></row><row _id="row-9duj_jn5u_3rsf" _uuid="00000000-0000-0000-EDB7-1F271C0EE92A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9duj_jn5u_3rsf"><intent_id>949284</intent_id><project_id>843363</project_id><text_data>Installed baffles in concrete septic tank by drilling holes, installing anchors and bolted on a plate.</text_data><comment_date>2018-12-17T00:00:00</comment_date></row><row _id="row-x56h.rqer-us2n" _uuid="00000000-0000-0000-80AB-63A8C0FA4D00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x56h.rqer-us2n"><intent_id>627243</intent_id><project_id>733963</project_id><text_data>LR 4/29/2014JOB #901-19</text_data><comment_date>2014-04-29T00:00:00</comment_date></row><row _id="row-ipqm.bh6u_vd52" _uuid="00000000-0000-0000-4187-A92825F8659E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ipqm.bh6u_vd52"><intent_id>1026239</intent_id><project_id>889829</project_id><text_data>WRI Job # 19.069</text_data><comment_date>2019-12-11T00:00:00</comment_date></row><row _id="row-4has-t2ex-yw2u" _uuid="00000000-0000-0000-3764-3CDF97B48C61" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4has-t2ex-yw2u"><intent_id>1273161</intent_id><project_id>1034556</project_id><text_data>9894287</text_data><comment_date>2022-10-09T00:00:00</comment_date></row><row _id="row-dcne-3cpq~tj8y" _uuid="00000000-0000-0000-E264-AC3005F33B65" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dcne-3cpq~tj8y"><intent_id>794231</intent_id><project_id>804315</project_id><text_data>Provide excavation for soil samplingBackhoe to dig areas for soil sampling</text_data><comment_date>2016-10-06T00:00:00</comment_date></row><row _id="row-4wuy.24c5-fzer" _uuid="00000000-0000-0000-EADF-46BDCAEBBDD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4wuy.24c5-fzer"><intent_id>756334</intent_id><project_id>789434</project_id><text_data>No</text_data><comment_date>2016-04-13T00:00:00</comment_date></row><row _id="row-zdz8_jwm8~k3jn" _uuid="00000000-0000-0000-F1A5-B6457E8465A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zdz8_jwm8~k3jn"><intent_id>1173471</intent_id><project_id>977254</project_id><text_data>Project# 03319, Sharkey, Lauren, 1114 W Spofford Ave, Spokane, WA 99205</text_data><comment_date>2021-09-08T00:00:00</comment_date></row><row _id="row-fg8x-gs36.f9r4" _uuid="00000000-0000-0000-D6F6-CDE64C380631" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fg8x-gs36.f9r4"><intent_id>914869</intent_id><project_id>851768</project_id><text_data>GU Job #18151Truck Driver: Water Tank Truck (0-3000) gallons. Purpose: Dust control.Truck Driver: Lowboy tractor/trailer to transport equipment to job site.</text_data><comment_date>2018-06-28T00:00:00</comment_date></row><row _id="row-9nyn-xacu_e3dj" _uuid="00000000-0000-0000-2E5A-A6834F3A5C80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9nyn-xacu_e3dj"><intent_id>826841</intent_id><project_id>811068</project_id><text_data>Everado Manzo61 Angus Ln.Yakima, WA 98901</text_data><comment_date>2017-04-17T00:00:00</comment_date></row><row _id="row-48qy.cbag~5pps" _uuid="00000000-0000-0000-2D75-E35EDF888BB4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-48qy.cbag~5pps"><intent_id>1183413</intent_id><project_id>982459</project_id><text_data>WO #422748</text_data><comment_date>2021-10-06T00:00:00</comment_date></row><row _id="row-dpbp-4q5i~yby7" _uuid="00000000-0000-0000-B149-8BA5CA8F9D56" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dpbp-4q5i~yby7"><intent_id>536813</intent_id><project_id>692784</project_id><text_data>Kaisha Hamilton 1226 Deer Creek Dr. , Ferndale, Wa 98248</text_data><comment_date>2012-09-29T00:00:00</comment_date></row><row _id="row-h4xq.ja6w~88yn" _uuid="00000000-0000-0000-1A52-EA3CA9DF4653" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h4xq.ja6w~88yn"><intent_id>1105461</intent_id><project_id>941097</project_id><text_data>SRO 1909110</text_data><comment_date>2020-11-23T00:00:00</comment_date></row><row _id="row-mj2d-359k_n639" _uuid="00000000-0000-0000-2EB8-29E597126F68" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mj2d-359k_n639"><intent_id>809575</intent_id><project_id>810478</project_id><text_data>WO #8019071</text_data><comment_date>2017-01-04T00:00:00</comment_date></row><row _id="row-qqbm.vxmn_tifd" _uuid="00000000-0000-0000-E91C-D21F5C8E2CD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qqbm.vxmn_tifd"><intent_id>753511</intent_id><project_id>788199</project_id><text_data>From: Julie Ohm [mailto:julie@kodiakindustries.com] Sent: Tuesday, March 29, 2016 1:35 PMTo: LNI RE Prevailing Wage Worker 1Subject: Added Note for HUD to Intent #753511Good Afternoon,It was brought to my attention that the verbiage below must be included in the �Public Notes� section of our Intent To Pay Prevailing Wage #753511, for Kodiak Industrial Solutions that was approved on 3.29.16 for our project with the King County Housing Authority using Davis Bacon Wage Rates.�Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations. Residential Wage DecisionWA160116 Modification #1, SUWA2011-011 PAINTER (Brush, Roller, and Spray) �Please use this email as a request to add this to our intent.Should you have any questions, please contact me.Thank you for your assistance in this matter.?Go Seahawks ! Julie OhmOffice ManagerKodiak Industrial Solutions, LLC 3203 15th Street, Everett, WA 98201Office: 425-374-7005 | Fax: 425-374-7380</text_data><comment_date>2016-03-31T00:00:00</comment_date></row><row _id="row-zqdh~2kp5.uzja" _uuid="00000000-0000-0000-73E6-692F911C5AF3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zqdh~2kp5.uzja"><intent_id>696698</intent_id><project_id>741219</project_id><text_data>A</text_data><comment_date>2015-05-27T00:00:00</comment_date></row><row _id="row-3h9k.inbu-7ggn" _uuid="00000000-0000-0000-AB79-36F68074EA54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3h9k.inbu-7ggn"><intent_id>1111781</intent_id><project_id>939508</project_id><text_data>NDT testing/inspection services</text_data><comment_date>2020-12-23T00:00:00</comment_date></row><row _id="row-m429~dbgf.busb" _uuid="00000000-0000-0000-9D4C-A946BE1CAE52" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m429~dbgf.busb"><intent_id>1155318</intent_id><project_id>944444</project_id><text_data>#1 Siding Installation#2</text_data><comment_date>2021-07-06T00:00:00</comment_date></row><row _id="row-sngw_rube.skiq" _uuid="00000000-0000-0000-AE3C-874EC535C600" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sngw_rube.skiq"><intent_id>911771</intent_id><project_id>849300</project_id><text_data>Filed by Tony Rossi</text_data><comment_date>2018-06-15T00:00:00</comment_date></row><row _id="row-33a8.szxf~dtpn" _uuid="00000000-0000-0000-BFE4-8291D4F3BB7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-33a8.szxf~dtpn"><intent_id>773532</intent_id><project_id>791130</project_id><text_data>Filed by Steven Horning</text_data><comment_date>2016-07-08T00:00:00</comment_date></row><row _id="row-azhg-g2q4~mhnh" _uuid="00000000-0000-0000-3C74-82E67E46330C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-azhg-g2q4~mhnh"><intent_id>533775</intent_id><project_id>695703</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change.</text_data><comment_date>2012-09-24T00:00:00</comment_date></row><row _id="row-4h26~7f4q-jh8u" _uuid="00000000-0000-0000-7474-3EDBBCA6A825" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4h26~7f4q-jh8u"><intent_id>572873</intent_id><project_id>711219</project_id><text_data>The Dept of L&amp;I has been paid 100% and now shows as in good standing.  Please continue processing Intent request.  Thank you!</text_data><comment_date>2013-06-19T00:00:00</comment_date></row><row _id="row-tkm8-yjyr_u3fe" _uuid="00000000-0000-0000-4D57-F35CC5269FAD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tkm8-yjyr_u3fe"><intent_id>1317019</intent_id><project_id>1053910</project_id><text_data>Our general laborers unload and distribute cabinets from our delivery truck to various rooms on the jobsite. The only tools used are hand trucks and rolling carts.Our trucks are 14� and 26� box trucks for delivery of cabinets.</text_data><comment_date>2023-04-05T00:00:00</comment_date></row><row _id="row-deq3_4uac~wk5m" _uuid="00000000-0000-0000-5AFA-5E1E0219EA17" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-deq3_4uac~wk5m"><intent_id>1081319</intent_id><project_id>929553</project_id><text_data>PTI SO 156177</text_data><comment_date>2020-08-18T00:00:00</comment_date></row><row _id="row-226k.jmvp.n29a" _uuid="00000000-0000-0000-0928-A6D290485F2E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-226k.jmvp.n29a"><intent_id>1177900</intent_id><project_id>972659</project_id><text_data>At Amistad ES we will cap off irrigation, relocate irrigation lines along curbing, patch sod at sidewalk and at lighting utility trench.  At Legacy HS we will repair irrigation, sod and landscape for installation of new portables.  We will be using tools such as rakes, shovels, pipe cutters, etc.</text_data><comment_date>2021-09-15T00:00:00</comment_date></row><row _id="row-m2k4~hvk6.fvvq" _uuid="00000000-0000-0000-F4E9-F9C03251CD83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m2k4~hvk6.fvvq"><intent_id>592086</intent_id><project_id>715524</project_id><text_data>From: MeMaKT@aol.com [mailto:MeMaKT@aol.com] Sent: Monday, September 09, 2013 3:38 PMTo: Navarrete, Briana (LNI)Subject: Correction NoticeIn response to correction notice for statement of intent to payprevailing wage-There will be no employees hired,owner operator only. Plaas,LLCKatie Plaas</text_data><comment_date>2013-09-09T00:00:00</comment_date></row><row _id="row-7v9z.mc8z~h7s8" _uuid="00000000-0000-0000-1AEC-EF9714C47580" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7v9z.mc8z~h7s8"><intent_id>1133344</intent_id><project_id>956792</project_id><text_data>Invoice # 15621 - march 2021 services</text_data><comment_date>2021-04-02T00:00:00</comment_date></row><row _id="row-pxzm.jwjt-ccha" _uuid="00000000-0000-0000-764B-1596112A5CB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pxzm.jwjt-ccha"><intent_id>718960</intent_id><project_id>771669</project_id><text_data>Install 8 CAT6 cables between IDF and 2 workstations to be used for either telephone (voice over distance) or computer (bits and bytes).  Work to be performed indoors</text_data><comment_date>2015-09-03T00:00:00</comment_date></row><row _id="row-e893~hxui-5jp2" _uuid="00000000-0000-0000-65EE-582293D58F1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e893~hxui-5jp2"><intent_id>680618</intent_id><project_id>746342</project_id><text_data>The labor ready workers on this project were not doing landscaping, they were general laborers moving materials for bleachers.</text_data><comment_date>2015-03-10T00:00:00</comment_date></row><row _id="row-mbhz.mip4~xbxr" _uuid="00000000-0000-0000-FE53-D2FA5DB3D121" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbhz.mip4~xbxr"><intent_id>1262456</intent_id><project_id>976093</project_id><text_data>223352- Telecommunications Technicians will be installing cabling for telephone and computers.  Terminate, test and label.  Cables will run indoors.</text_data><comment_date>2022-08-30T00:00:00</comment_date></row><row _id="row-sb5v-p6ck.fcmp" _uuid="00000000-0000-0000-0B6F-3DAF366190E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sb5v-p6ck.fcmp"><intent_id>999009</intent_id><project_id>890036</project_id><text_data>1) Install ductless heat pump2) Single family dwelling3) 1 story4a) no, 4b) no, 4c) yes, 4d) no, 4e) no, 4f) no, 4g) no, 4h) no, 4i) no, 4j) no, 4k) no, 4l) no, 5) yes6) yes7) no8) no</text_data><comment_date>2019-08-12T00:00:00</comment_date></row><row _id="row-mc6f.bkxm~p8n3" _uuid="00000000-0000-0000-35F3-F3E20F839801" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mc6f.bkxm~p8n3"><intent_id>1156442</intent_id><project_id>973302</project_id><text_data>Change out 200 amp panel and meter, rewire knob &amp; tube circuits.Yes, Single family dwelling2 storya. no, b. no, c. yes, d. no, e. no, f. no, g. no, h. no, i. no, j. no, k. no, l. noNoNoNoNo</text_data><comment_date>2021-06-29T00:00:00</comment_date></row><row _id="row-jscg_wnp4_4y7w" _uuid="00000000-0000-0000-34AA-206C27B8C9D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jscg_wnp4_4y7w"><intent_id>794820</intent_id><project_id>804535</project_id><text_data>Snap Project #19593</text_data><comment_date>2016-10-09T00:00:00</comment_date></row><row _id="row-s4f4.dgji-vtw7" _uuid="00000000-0000-0000-E60C-A5E1751ACE67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4f4.dgji-vtw7"><intent_id>1182830</intent_id><project_id>973436</project_id><text_data>The owner may or may not perform work on this project.</text_data><comment_date>2021-10-04T00:00:00</comment_date></row><row _id="row-g2xa.mgqj-zuza" _uuid="00000000-0000-0000-9094-76BA3D880D8E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g2xa.mgqj-zuza"><intent_id>1290968</intent_id><project_id>1035523</project_id><text_data>HVAC fabrication performed at Capital's shop in Lacey, Thurston County.</text_data><comment_date>2022-12-19T00:00:00</comment_date></row><row _id="row-mgen_je2u.5h7c" _uuid="00000000-0000-0000-77B9-EECD6B67FA8F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mgen_je2u.5h7c"><intent_id>1521913</intent_id><project_id>1177957</project_id><text_data>Customer 20468/Contract 3770912/1/2024 thru 11/30/2025</text_data><comment_date>2025-03-27T00:00:00</comment_date></row><row _id="row-tnpp.s5nz-ba6i" _uuid="00000000-0000-0000-B8EC-5A6E0BEAD05D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tnpp.s5nz-ba6i"><intent_id>892869</intent_id><project_id>813325</project_id><text_data>Providing the beautification of the area adjacent to the road using a mulch/blower truck.</text_data><comment_date>2018-03-14T00:00:00</comment_date></row><row _id="row-7a9e~ue83_7p2q" _uuid="00000000-0000-0000-7F6E-DCD69292DA3B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7a9e~ue83_7p2q"><intent_id>747884</intent_id><project_id>785639</project_id><text_data>This project involves the construction primarily of an asphalt trail , concrete work,  asphalt parking areas , street crossing improvement through Washington Park Arboretum-The work involves grading, filling, invasive plant removal for which  general labors and non landscape operators for the construction of the trial work itself as well as for pedestrian walk bridges � there are rockery walls being installed ( mostly 4� or less) that we are subcontracting out to AAA Rockery � also subcontracted is the asphalt work to Icon Materials, Tree removal to ( Davey Tree Service) , Helical piles to Ram Jack, tail signage and installation of same will be subcontracted out to NW Asphalt �there are a few concrete walls to be constructed by a subcontractor yet to be determined. In addition there are new landscape areas being built for public day use that include tilling in 2� of compost into existing soils, planting of &amp;#177; 30 thousand plants, 80 thousand square feet of new lawn area, installation of wood chip mulch,  for which landscape labor will be used --  an irrigation system consisting of a mainline and quick couple valves that has a bury depth of 24� cover . There is also some reconstruction creek channeling.  Creek channeling will be accomplished by non landscape crew members --</text_data><comment_date>2016-02-23T00:00:00</comment_date></row><row _id="row-j5ip~pdjm_u296" _uuid="00000000-0000-0000-A8F6-5462B4F071D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j5ip~pdjm_u296"><intent_id>803765</intent_id><project_id>807820</project_id><text_data>Jobs were completed on 3 separate days. On 9/8/16 at 3528 Crestview Dr W, there was 1 Faller/Bucker chain saw laborer and 2 Topper laborers. On 9/15/16 at 13004 Reservoir Rd E, Puyallup, there was 1 Faller/Bucker chain saw laborer and 2 toppers. On 9/20/16 there were 2 Faller/Bucker chain saw laborers and 2 Topper laborers.</text_data><comment_date>2016-11-21T00:00:00</comment_date></row><row _id="row-fe6i.f328-maji" _uuid="00000000-0000-0000-7A90-F01A7123AE36" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fe6i.f328-maji"><intent_id>622116</intent_id><project_id>697753</project_id><text_data>Owner Operated  WO#16</text_data><comment_date>2014-03-27T00:00:00</comment_date></row><row _id="row-yrv9_9xh2-xwpq" _uuid="00000000-0000-0000-D0D7-22555B920423" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yrv9_9xh2-xwpq"><intent_id>1194176</intent_id><project_id>965361</project_id><text_data>Installing medium mulch by blowing into beds / tree rings @ 2 or 3' depths or deeper as required, cleaning up with leaf blowers if necessary.</text_data><comment_date>2021-11-18T00:00:00</comment_date></row><row _id="row-fy8v-ct4d.rvvu" _uuid="00000000-0000-0000-1DE2-2D5981A9E70F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fy8v-ct4d.rvvu"><intent_id>531417</intent_id><project_id>693010</project_id><text_data>-- On 10/19/2012 by crke235:--Fringe benefit package totals $16.29 and the breakdown of that total amount is: $9.52 medical, $0.38 life, $3.54 vacation, and $2.85 holiday.</text_data><comment_date>2012-10-23T00:00:00</comment_date></row><row _id="row-e5zi_bbcr.5vgd" _uuid="00000000-0000-0000-C068-B9AADA159F78" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e5zi_bbcr.5vgd"><intent_id>745196</intent_id><project_id>739248</project_id><text_data>Filed by Buddy Miller</text_data><comment_date>2016-02-05T00:00:00</comment_date></row><row _id="row-ih44_sw4m~cj9c" _uuid="00000000-0000-0000-7FD5-0044DD17BB3C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ih44_sw4m~cj9c"><intent_id>779275</intent_id><project_id>798616</project_id><text_data>Filed by Rodney R Roeder</text_data><comment_date>2016-08-02T00:00:00</comment_date></row><row _id="row-quic~4mj5_tc3f" _uuid="00000000-0000-0000-6B49-CDF851B81099" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-quic~4mj5_tc3f"><intent_id>1180955</intent_id><project_id>955981</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Perform knob and tube inspection and replace bath fan &amp; kitchen fan. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? YES, SINLE FAMILY RESDIDENCE#3 - Including any basement or garage, how many stories or levels does the structure have? 2#4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO(b) Any retail use in the structure? NO(c) Permanent residence only? YES(d) Rehabilitation house? NO(e) Transitional housing? NO(f) Communal dining facility? NO(g) Treatment services? NO(h) Assisted living services? NO(I) Dormitories? NO(j) Counseling? NO(k) Is each room and/or bed in the structure rented separately? NO(l) Other? NONE#5 - Does each dwelling unit have its own self-contained kitchen? NO#6 - Does each dwelling unit have its own bathroom? NO#7 - Is there a community facility or manager�s office on site? NO#8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2021-09-27T00:00:00</comment_date></row><row _id="row-c6fj-i3t5.9z4e" _uuid="00000000-0000-0000-B440-C791AC858450" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6fj-i3t5.9z4e"><intent_id>482219</intent_id><project_id>675838</project_id><text_data>Madison Park Apartment is a residential apartment complex that has 110 units. Each unit has a kitchen and at least one bathroom and is considered a permanent primary residence for all its tenants. The building is no more than three stories in height. The electricians will be replacing lamps, and the plumber will be installing kitchen and bathroom aerators and shower heads. This job meets the residential job requirements.</text_data><comment_date>2011-10-06T00:00:00</comment_date></row><row _id="row-b2xz-rqht~wj7c" _uuid="00000000-0000-0000-7507-BA5DDC94C787" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b2xz-rqht~wj7c"><intent_id>463305</intent_id><project_id>669047</project_id><text_data>ALLIED'S JOB # - INTENT REQUIRED BEFORE JOB #, QUOTE # ALLQ12371</text_data><comment_date>2011-06-29T00:00:00</comment_date></row><row _id="row-95fk.mvdm.y97q" _uuid="00000000-0000-0000-2FFA-E5C195EBCC57" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-95fk.mvdm.y97q"><intent_id>791623</intent_id><project_id>784516</project_id><text_data>INTERWEST HIRED US</text_data><comment_date>2016-09-24T00:00:00</comment_date></row><row _id="row-ridr~x5a6_b7bp" _uuid="00000000-0000-0000-E966-172FAE64D56C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ridr~x5a6_b7bp"><intent_id>609823</intent_id><project_id>726281</project_id><text_data>Filed by Bo Smith.</text_data><comment_date>2013-12-26T00:00:00</comment_date></row><row _id="row-m3bc_nkws_ri6f" _uuid="00000000-0000-0000-DF0C-3033C16608BF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m3bc_nkws_ri6f"><intent_id>525397</intent_id><project_id>664372</project_id><text_data>We originally filed under Intent#310838.  This was the incorrect intent, therefore we have re-filed under General Contractor Intent#451699.</text_data><comment_date>2012-07-31T00:00:00</comment_date></row><row _id="row-w9hb_9yab~84pn" _uuid="00000000-0000-0000-83AA-D7159C14E48E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9hb_9yab~84pn"><intent_id>1186193</intent_id><project_id>984089</project_id><text_data>Fringe $21-$17.87 = $3.13Vacation - $10.00Holiday - $7.87Wage - $21.00Wage - $21.00Prevailing Wage -$17.87 -------------------------------------              Fringe = $3.13</text_data><comment_date>2021-11-17T00:00:00</comment_date></row><row _id="row-txsn-5zmz.paa2" _uuid="00000000-0000-0000-2AD4-D0BC19E92DB1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-txsn-5zmz.paa2"><intent_id>764079</intent_id><project_id>792799</project_id><text_data>Filed by R Eric Nemeth</text_data><comment_date>2016-05-24T00:00:00</comment_date></row><row _id="row-233g_wtit.nmqd" _uuid="00000000-0000-0000-51FB-EE1919AA0B06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-233g_wtit.nmqd"><intent_id>599929</intent_id><project_id>722209</project_id><text_data>Remove existing ivy from  planting beds. Install 2&amp;quot; depth of bark. Bark placed using 45hp walk behind Dingo loader. Other work performed using hand tools</text_data><comment_date>2013-10-17T00:00:00</comment_date></row><row _id="row-rtpk~ihxz~578c" _uuid="00000000-0000-0000-59C3-24378C89F440" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rtpk~ihxz~578c"><intent_id>681035</intent_id><project_id>756482</project_id><text_data>We are approving your form with the residential wage rates used based upon the information provided and should that information change the answer could change. Please also note that you can only use residential wage rates for those trades where one exists, to construct, do maintenance, or other work upon the building. No work on community buildings, required parking, site work, landscaping, connections to existing street, or utility infrastructure may be paid at residential rates.</text_data><comment_date>2015-03-05T00:00:00</comment_date></row><row _id="row-mnda~g3ri~94v8" _uuid="00000000-0000-0000-5681-BDB9D0FA7D38" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mnda~g3ri~94v8"><intent_id>556883</intent_id><project_id>687813</project_id><text_data>work involves the construction of the landscape and the irrigation for the project.   using a bobcat and shovels and rakes   irrigation trenches will be at a depth of 12 to 18 inches</text_data><comment_date>2013-02-20T00:00:00</comment_date></row><row _id="row-4bbc~upvq_demg" _uuid="00000000-0000-0000-CA92-32E713BACF51" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4bbc~upvq_demg"><intent_id>1209297</intent_id><project_id>907929</project_id><text_data>JMI #S45926</text_data><comment_date>2022-02-04T00:00:00</comment_date></row><row _id="row-gtyx~2344~46i3" _uuid="00000000-0000-0000-4889-6B35C86A23D4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gtyx~2344~46i3"><intent_id>760330</intent_id><project_id>791222</project_id><text_data>A) The whole project is converting a historic building for use as a &amp;quot;pub&amp;quot; serving food and beverages.  B) Bargreen-Ellingson is providing food &amp; beverage service equipment and installation of the walk-in cooler.  C)  General laborers will deliver uncrated equipment, set-in-place, and apply silicone if needed.  Other trades will make all connections and other work deemed necessary for the equipment to be fully functional.</text_data><comment_date>2016-05-10T00:00:00</comment_date></row><row _id="row-p5xu_d46r_a8qb" _uuid="00000000-0000-0000-8804-48E140B85CE3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p5xu_d46r_a8qb"><intent_id>688525</intent_id><project_id>759726</project_id><text_data>Moon Security will be installing wireless transmitters that will be wired to existing relays at the generators for notification of status of generator.  No wiring to generator itself will occur.  Connection to relay at Generator has been approved by Generator company.</text_data><comment_date>2015-04-15T00:00:00</comment_date></row><row _id="row-swz6~hmw6.547d" _uuid="00000000-0000-0000-FF0A-0D5ABD4E88BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-swz6~hmw6.547d"><intent_id>916714</intent_id><project_id>855446</project_id><text_data>Other truck is water truck used for dust control.</text_data><comment_date>2018-07-09T00:00:00</comment_date></row><row _id="row-xqsz~f8se~amyr" _uuid="00000000-0000-0000-44EE-6ACD89E89A05" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xqsz~f8se~amyr"><intent_id>1156193</intent_id><project_id>968542</project_id><text_data>Main Ave S, North Bend, WA 980451. Attic Blow, Wall Blow, Crawl Space2. Multi family    3. 2    4. a)No b)No c)Yes d)No e)No f)No g)No h)No i)No j)No k)No  5. Yes   6. Yes    7. Yes    8. No</text_data><comment_date>2021-06-28T00:00:00</comment_date></row><row _id="row-p499~v63e_2ttm" _uuid="00000000-0000-0000-735C-FDA1701A89A0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p499~v63e_2ttm"><intent_id>696617</intent_id><project_id>763067</project_id><text_data>All work to do be done by owner operator.</text_data><comment_date>2015-05-27T00:00:00</comment_date></row><row _id="row-scsv.ftz2.njrs" _uuid="00000000-0000-0000-9E60-DEDF519F5B06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-scsv.ftz2.njrs"><intent_id>554928</intent_id><project_id>704326</project_id><text_data>Job # 296683</text_data><comment_date>2013-02-05T00:00:00</comment_date></row><row _id="row-ihq8~ghrw-h8vk" _uuid="00000000-0000-0000-C9D2-C42FD6FB49FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ihq8~ghrw-h8vk"><intent_id>521974</intent_id><project_id>691478</project_id><text_data>RE: Meridian Valley Creek Enhancement Description of whole project:Enhance conditions of existing creek within the Meridian Golf Course by re-contouring existing soils for positive drainage, stockpiling and re-application of on-site amended topsoil, re-seeding, planting, 2-&amp;#189;� tall cast in place concrete wall, and installation of habitat features and streambed gravel. Description of Terra Dynamics self-performed work: stripping existing vegetation &amp; weeds, and usable topsoil, re-contouring existing soils, replacing topsoil to a depth less than 6�, rototilling in soil amendments, planting, mulching less than 6�, re-seeding, placing habitat features and gravel.  All equipment will be under 90Hp, such as mini-excavators, mini-loader, and bobcat.  There is no subsurface drainage system, French drain or other subsurface water collection system. Subcontracted items: concrete wall and asphalt repair (if required).</text_data><comment_date>2012-07-23T00:00:00</comment_date></row><row _id="row-tggt~cs63_bdua" _uuid="00000000-0000-0000-C71F-61EC12DE1A97" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tggt~cs63_bdua"><intent_id>1110049</intent_id><project_id>943647</project_id><text_data>252109</text_data><comment_date>2020-12-15T00:00:00</comment_date></row><row _id="row-nqgm-6s6t-ufza" _uuid="00000000-0000-0000-D838-20ABB08358A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nqgm-6s6t-ufza"><intent_id>757962</intent_id><project_id>674285</project_id><text_data>GARY REED &amp; SONS LLC -- OWNER OPERATOR GARY REED, JOE REED , JEFF REED</text_data><comment_date>2016-04-21T00:00:00</comment_date></row><row _id="row-rz4f-v9hh_jbsy" _uuid="00000000-0000-0000-16B3-08B5CAEA7B84" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rz4f-v9hh_jbsy"><intent_id>1141711</intent_id><project_id>960756</project_id><text_data>52347 Oakville MS/HS clocks</text_data><comment_date>2021-05-04T00:00:00</comment_date></row><row _id="row-c2tm_huvt~gkb7" _uuid="00000000-0000-0000-9A14-5AB2C2A5C3E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c2tm_huvt~gkb7"><intent_id>1042024</intent_id><project_id>910522</project_id><text_data>Terminate all telephone cable runs in customer provided racks with the existing building</text_data><comment_date>2020-02-28T00:00:00</comment_date></row><row _id="row-wwrq_9cwh.etkg" _uuid="00000000-0000-0000-B58F-3B3F82DC036F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wwrq_9cwh.etkg"><intent_id>621957</intent_id><project_id>731722</project_id><text_data>TGLC is having sub (Nature's Way) perform all work; clearance pruning of birch trees.</text_data><comment_date>2014-03-26T00:00:00</comment_date></row><row _id="row-6iy7-xxuf-pvjy" _uuid="00000000-0000-0000-C903-DB0F555D98A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6iy7-xxuf-pvjy"><intent_id>1080181</intent_id><project_id>920172</project_id><text_data>Tiger Mountain Rental owns the trucks, lakeridge pays the employees</text_data><comment_date>2020-08-13T00:00:00</comment_date></row><row _id="row-pegn~zqcj-j3t3" _uuid="00000000-0000-0000-264F-B944DD8C1E86" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pegn~zqcj-j3t3"><intent_id>1008284</intent_id><project_id>877943</project_id><text_data>The project is to build a new CMU pump station.Our job is to plant a hedge around the new pump station.</text_data><comment_date>2019-09-18T00:00:00</comment_date></row><row _id="row-ktpx~vc7d_8qka" _uuid="00000000-0000-0000-EA29-4D4F21EEAFC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ktpx~vc7d_8qka"><intent_id>687824</intent_id><project_id>703994</project_id><text_data>Higher paid lineperson is the foreman</text_data><comment_date>2015-04-07T00:00:00</comment_date></row><row _id="row-b4ur.qxnd-itk7" _uuid="00000000-0000-0000-89A9-FE4E368905AB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b4ur.qxnd-itk7"><intent_id>1232997</intent_id><project_id>1000447</project_id><text_data>WRI JOB# 22.950/47954</text_data><comment_date>2022-05-12T00:00:00</comment_date></row><row _id="row-2hck-8nan-fb47" _uuid="00000000-0000-0000-E8E5-20ABA1997E1C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2hck-8nan-fb47"><intent_id>686386</intent_id><project_id>758777</project_id><text_data>Preparing existing landscaping infields for game days using chalk spreader.</text_data><comment_date>2015-05-11T00:00:00</comment_date></row><row _id="row-cf5z-npbr~3x6a" _uuid="00000000-0000-0000-A30A-F1A0397B4AE2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cf5z-npbr~3x6a"><intent_id>761956</intent_id><project_id>791925</project_id><text_data>please disregard insulation notes:  this is a window job.</text_data><comment_date>2016-05-24T00:00:00</comment_date></row><row _id="row-njzz.27ac_2p9r" _uuid="00000000-0000-0000-1990-DD864624070B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-njzz.27ac_2p9r"><intent_id>581596</intent_id><project_id>715615</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2013-07-17T00:00:00</comment_date></row><row _id="row-cwce-6i7b~f48i" _uuid="00000000-0000-0000-1BF7-3F8E5E423805" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cwce-6i7b~f48i"><intent_id>828239</intent_id><project_id>818797</project_id><text_data>#1 - Countertop installation#2 - University residence#3 - 8 floors#4 - A) no     B) no     C) no     D) no     E) no     F) yes     G) no     H) no     I) Yes     J) no     K) yes#5 - unknown#6 - Uknown#7  - yes#8 - no</text_data><comment_date>2017-04-21T00:00:00</comment_date></row><row _id="row-2ff3~mp5b.av82" _uuid="00000000-0000-0000-0401-C8152A3D9742" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ff3~mp5b.av82"><intent_id>545254</intent_id><project_id>699997</project_id><text_data>SUSAN LAWSON250 HO HUM LANEABERDEEN WA 98520</text_data><comment_date>2012-11-19T00:00:00</comment_date></row><row _id="row-acpr.czbq-tbbn" _uuid="00000000-0000-0000-2FD8-A4C5E66FCEA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-acpr.czbq-tbbn"><intent_id>624238</intent_id><project_id>704980</project_id><text_data>Contract Number: SC 30056-11-195-099</text_data><comment_date>2014-04-10T00:00:00</comment_date></row><row _id="row-qug3.fa95~rjnr" _uuid="00000000-0000-0000-5DF4-72D2B62B14D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qug3.fa95~rjnr"><intent_id>618873</intent_id><project_id>724848</project_id><text_data>Form filed by: Stephen Nielsen1. Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statues &amp; regulations in Washington and;2. Holroyd Co., Inc. does nto agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer and dump trucks are correct.</text_data><comment_date>2014-03-05T00:00:00</comment_date></row><row _id="row-gn6n_635z.3hgh" _uuid="00000000-0000-0000-7A35-8A4FE7F1DBDF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gn6n_635z.3hgh"><intent_id>701050</intent_id><project_id>736992</project_id><text_data>We are an Oregon employer with industrial insurance through SAIF.</text_data><comment_date>2015-06-16T00:00:00</comment_date></row><row _id="row-cakx~uueq-sngx" _uuid="00000000-0000-0000-A07F-D9FD844F81BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cakx~uueq-sngx"><intent_id>816394</intent_id><project_id>787394</project_id><text_data>Contractor Registration number: CC ADDISCS893CW  Expires 5/22/2018</text_data><comment_date>2017-02-28T00:00:00</comment_date></row><row _id="row-kp9w~f5ry_fjus" _uuid="00000000-0000-0000-A4BD-51D5AC224B37" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kp9w~f5ry_fjus"><intent_id>1010655</intent_id><project_id>894648</project_id><text_data>Filed by Ann G Marquez</text_data><comment_date>2019-09-27T00:00:00</comment_date></row><row _id="row-wmc3_z8xu~vi7x" _uuid="00000000-0000-0000-55F0-74BFA6AE8FA6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wmc3_z8xu~vi7x"><intent_id>767199</intent_id><project_id>769388</project_id><text_data>C E &amp;C Inc. is filing on behalf of Structural Solutions LLC due to ceased operations.</text_data><comment_date>2016-06-09T00:00:00</comment_date></row><row _id="row-mh6b~dd5i.hn8q" _uuid="00000000-0000-0000-9896-FCD8AA1D1A9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mh6b~dd5i.hn8q"><intent_id>898366</intent_id><project_id>847974</project_id><text_data>Our duties for this project were to bring playground material in our truck to the facility where everything was marked and ready for the Swanson employee and additional hired subcontractor (landscape construction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used.Truck = KENWORTH T-800 4 axleTrailer = IMCO live floor trailer 48�This truck was used to deliver Engineered Wood Fiber (a type of Playground Chip). Material was delivered using our blower trailer to blow material into designated areas specified by the Prime Contractor.We hired a subcontractor to complete the landscape construction portion, to take a hose and blow the product on the playground where they told us. No other tools, etc. are used</text_data><comment_date>2018-04-12T00:00:00</comment_date></row><row _id="row-tf6f.keyu.5kgf" _uuid="00000000-0000-0000-9F36-1A1E0C4F6B3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tf6f.keyu.5kgf"><intent_id>807635</intent_id><project_id>809575</project_id><text_data>Correct PO# should be #1204932</text_data><comment_date>2017-01-26T00:00:00</comment_date></row><row _id="row-ua73-gkmm_mu66" _uuid="00000000-0000-0000-CFF7-AE3CDD716149" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ua73-gkmm_mu66"><intent_id>780239</intent_id><project_id>798979</project_id><text_data>the note-- &amp;quot;other truck - 10 yard dump &amp;quot;  is an error.  The only truck needed is the Dump Truck which is listed.  Thank you!</text_data><comment_date>2016-08-15T00:00:00</comment_date></row><row _id="row-urnm~642n.76p9" _uuid="00000000-0000-0000-EA5D-74E3F2FB293F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-urnm~642n.76p9"><intent_id>627925</intent_id><project_id>704797</project_id><text_data>Total hours worked on the project was 56.5 @ $28.12 = $1588.78</text_data><comment_date>2014-05-19T00:00:00</comment_date></row><row _id="row-hkpx-n64u~8c73" _uuid="00000000-0000-0000-1044-E57313019995" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hkpx-n64u~8c73"><intent_id>805629</intent_id><project_id>800565</project_id><text_data>Install irrigation system repair existing irrigation system and install sod using 18hp walk-behind trencher, 25hp mini excavator, 45hp skid loader, and landscaping hand tools.</text_data><comment_date>2016-12-05T00:00:00</comment_date></row><row _id="row-9zny-z6uv-phif" _uuid="00000000-0000-0000-C303-5966C8146847" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9zny-z6uv-phif"><intent_id>1316203</intent_id><project_id>1044237</project_id><text_data>Edward Cowden owner operator 3-6-2023 1.5 hrs</text_data><comment_date>2023-04-01T00:00:00</comment_date></row><row _id="row-kvgi~2zzj~gszu" _uuid="00000000-0000-0000-A12D-F9CF0E36C5B1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kvgi~2zzj~gszu"><intent_id>546889</intent_id><project_id>700732</project_id><text_data>Service Call 121107-0002</text_data><comment_date>2012-12-03T00:00:00</comment_date></row><row _id="row-jn4b_vare.isbc" _uuid="00000000-0000-0000-26B7-697A7B3FEC9B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jn4b_vare.isbc"><intent_id>453804</intent_id><project_id>633239</project_id><text_data>After review, this specific type of pressure washing for this project may be paid at the Shipbuilding &amp; Ship Repair/Laborer rate. (chrr235)</text_data><comment_date>2011-07-06T00:00:00</comment_date></row><row _id="row-ya6d_2bzw~5h7w" _uuid="00000000-0000-0000-0347-BE7DDC3DE08D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ya6d_2bzw~5h7w"><intent_id>1049135</intent_id><project_id>906133</project_id><text_data>this project is exempt from the payment of state prevailing wage rates based on The Housing Act of 1937 and 24 CFR 965.101. We need you to correct your form and add a similar statement to your form in the note section</text_data><comment_date>2020-04-02T00:00:00</comment_date></row><row _id="row-8pzb~up33_576n" _uuid="00000000-0000-0000-7B23-8CB47F4A3C18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8pzb~up33_576n"><intent_id>991030</intent_id><project_id>886897</project_id><text_data>Landscape laborers will be used to plant the trees, place the topsoil and mulch. Workers will use handtools.</text_data><comment_date>2019-07-16T00:00:00</comment_date></row><row _id="row-f9m4-5b57~b5nd" _uuid="00000000-0000-0000-30AE-60DE5FEC837F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f9m4-5b57~b5nd"><intent_id>798165</intent_id><project_id>805810</project_id><text_data>1) install ductless heat pump system 2)single family dwelling 3)one story 4)residence a)no b)no c)yes d)no e)no f)no g)no h)no I)no j)no k)no 5)yes 6)yes 7)no 8)no</text_data><comment_date>2016-10-26T00:00:00</comment_date></row><row _id="row-b2rz_uzpt.dcse" _uuid="00000000-0000-0000-0072-0FF0B92A356C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b2rz_uzpt.dcse"><intent_id>597923</intent_id><project_id>721467</project_id><text_data>Work performed inside consisting of grounding connecting wires to radio racks, generators and alarm boxes.  Using crimpers, wire cutters and drills.  Also installed polyphasers using wrenches.</text_data><comment_date>2013-10-14T00:00:00</comment_date></row><row _id="row-vpuf_z8fd-hbzu" _uuid="00000000-0000-0000-01B3-11DCC4E607A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vpuf_z8fd-hbzu"><intent_id>482085</intent_id><project_id>675780</project_id><text_data>Per Tony at King County, this is a NOISE REMEDY project, which is residential.  (chrr235)</text_data><comment_date>2011-10-11T00:00:00</comment_date></row><row _id="row-gkz2.quz8.pp9z" _uuid="00000000-0000-0000-1B4C-663948CBEB7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gkz2.quz8.pp9z"><intent_id>920243</intent_id><project_id>856694</project_id><text_data>nobody but me will be performing the work</text_data><comment_date>2018-07-23T00:00:00</comment_date></row><row _id="row-e78f-knwe-yvbw" _uuid="00000000-0000-0000-C1E9-CA2F3007E50C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-e78f-knwe-yvbw"><intent_id>1078491</intent_id><project_id>895213</project_id><text_data>Locals 302/612 Fringe Package: Health-$8.57, Pension-$13.15, Training-$.70, Union Programs-$.30, International Training-$.05</text_data><comment_date>2020-08-11T00:00:00</comment_date></row><row _id="row-7wfe_spbp.aefs" _uuid="00000000-0000-0000-0671-EF89B0530493" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7wfe_spbp.aefs"><intent_id>778324</intent_id><project_id>777476</project_id><text_data>I only know what our part of the project we are just a sub of a sub. (I need to know what prevailing wage to use for the following description of work) Legacy will be digging holes with shovels and post hole diggers to install pipe into the ground sticking up to support grip strut across for the span of the building roughly 55� long. We will be using generic hand tools and socket wrenches to tighten the hardware required to assemble the ice bridge.  Once the work is completed. We will take a photo and leave.</text_data><comment_date>2016-08-04T00:00:00</comment_date></row><row _id="row-rzrt-tuxx.mqx2" _uuid="00000000-0000-0000-9374-D41C8C5063C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzrt-tuxx.mqx2"><intent_id>675569</intent_id><project_id>749218</project_id><text_data>&amp;quot;TRUCK DRIVER OTHER&amp;quot; USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK; &amp;quot;POWER EQUIPMENT OPERATOR MOTOR PATROL GRADER FINISHER&amp;quot; - NOT MOTOR PATROL, VACTOR GUZZLER/VACCON SUPER SUCKER</text_data><comment_date>2015-01-21T00:00:00</comment_date></row><row _id="row-mkaz-ye54-j4d6" _uuid="00000000-0000-0000-BC75-BDD8A978F86E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mkaz-ye54-j4d6"><intent_id>571103</intent_id><project_id>710316</project_id><text_data>Bajuk 2817 Franklin St 98225</text_data><comment_date>2013-05-22T00:00:00</comment_date></row><row _id="row-3n5p-4b6i-nqaj" _uuid="00000000-0000-0000-3F44-07B629F6796E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3n5p-4b6i-nqaj"><intent_id>1198284</intent_id><project_id>991087</project_id><text_data>518849</text_data><comment_date>2022-01-24T00:00:00</comment_date></row><row _id="row-n4j8.swx9_6frd" _uuid="00000000-0000-0000-8A1C-94F89C446504" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n4j8.swx9_6frd"><intent_id>1212452</intent_id><project_id>995025</project_id><text_data>Other trucks are low boys to haul equipment we are a self insured company and are in good standings</text_data><comment_date>2022-02-18T00:00:00</comment_date></row><row _id="row-vd8a~mysv_eka8" _uuid="00000000-0000-0000-2C6D-A53F48802CC6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vd8a~mysv_eka8"><intent_id>662714</intent_id><project_id>747597</project_id><text_data>Job Order Contract RTA/CN 0008-13, Contract Purchase Order No. 141074 OBWork Order No. 039 - 147654 OD</text_data><comment_date>2014-10-28T00:00:00</comment_date></row><row _id="row-fz9w-iadg-wycz" _uuid="00000000-0000-0000-5CFD-A691E62742DA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fz9w-iadg-wycz"><intent_id>1262444</intent_id><project_id>1028746</project_id><text_data>9899143</text_data><comment_date>2022-08-30T00:00:00</comment_date></row><row _id="row-8xgs-sxhb.mceh" _uuid="00000000-0000-0000-A7C0-3AD36AC67D87" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8xgs-sxhb.mceh"><intent_id>512907</intent_id><project_id>688015</project_id><text_data>Idaho based workers comp.One employee will be paid their normal hourly rate of $18.00 per hour and elected to have the prevailing rate balance of $15.65 per hour paid to his pension. The other employee is only a temporary employee and therefore will be paid the full $33.65 per hour rate. Please contact me at (208) 285-1411 if I can provide further assistance.</text_data><comment_date>2012-05-21T00:00:00</comment_date></row><row _id="row-8t6k_h8yr-6qph" _uuid="00000000-0000-0000-431D-B6041E07F979" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8t6k_h8yr-6qph"><intent_id>1156236</intent_id><project_id>968580</project_id><text_data>I was hired by Yakima Yakima county to remodel residence , paint and texture interior and exterior, repair floors, install smoke detectors , repair electrical panel , is not a commercial property ,is not use for counseling or dormitories is a single residence 1 kitchen 2 bedroom 1 bathroom</text_data><comment_date>2021-07-14T00:00:00</comment_date></row><row _id="row-jf8n~gjj6-xnk9" _uuid="00000000-0000-0000-1BFC-0FE4BE9D731C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jf8n~gjj6-xnk9"><intent_id>952505</intent_id><project_id>869502</project_id><text_data>Elect Tech(06)inside and outside workLAN(Local Area Network)Bits and Bytes</text_data><comment_date>2018-12-27T00:00:00</comment_date></row><row _id="row-dgke~vikx_r9mp" _uuid="00000000-0000-0000-CC43-21A674E997E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dgke~vikx_r9mp"><intent_id>450611</intent_id><project_id>663950</project_id><text_data>Dates were entered incorrectly</text_data><comment_date>2011-04-19T00:00:00</comment_date></row><row _id="row-bb4t_fd2u~mf88" _uuid="00000000-0000-0000-D78D-EAF81F6076D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bb4t_fd2u~mf88"><intent_id>670465</intent_id><project_id>749863</project_id><text_data>Filed by Noel Barber</text_data><comment_date>2014-12-18T00:00:00</comment_date></row><row _id="row-8zyc~g3m6_9tgt" _uuid="00000000-0000-0000-3F0F-4F1E6A64AA53" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8zyc~g3m6_9tgt"><intent_id>1247592</intent_id><project_id>1021168</project_id><text_data>I apologize about that. I did have the incorrect county listed. I have updated the County selection as well as the Trades to match the correct county.</text_data><comment_date>2022-08-01T00:00:00</comment_date></row><row _id="row-ebgz_efvq-mkst" _uuid="00000000-0000-0000-7D4B-1EE92D868302" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebgz_efvq-mkst"><intent_id>746495</intent_id><project_id>769807</project_id><text_data>Job # 170120-001 Q</text_data><comment_date>2016-02-12T00:00:00</comment_date></row><row _id="row-22y8_r9iv.fxgz" _uuid="00000000-0000-0000-2048-2398FAAED526" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-22y8_r9iv.fxgz"><intent_id>806254</intent_id><project_id>808933</project_id><text_data>Jw wage 40.30Pension 8.00h&amp;W 9.08app training .60admin fund .30lmcc.10nlmcc .01nebf 1.21</text_data><comment_date>2016-12-08T00:00:00</comment_date></row><row _id="row-m6aj~v4tf_evna" _uuid="00000000-0000-0000-3CF5-3FCF20766EF7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6aj~v4tf_evna"><intent_id>880175</intent_id><project_id>801714</project_id><text_data>This project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades.</text_data><comment_date>2017-12-21T00:00:00</comment_date></row><row _id="row-bjnm~q2h9-tuqa" _uuid="00000000-0000-0000-8AC8-EF5D2EE16BAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bjnm~q2h9-tuqa"><intent_id>902347</intent_id><project_id>845609</project_id><text_data>Hauling for Hire</text_data><comment_date>2018-05-03T00:00:00</comment_date></row><row _id="row-icqs_82rm~ct29" _uuid="00000000-0000-0000-52D6-B19A9563E1F1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-icqs_82rm~ct29"><intent_id>681574</intent_id><project_id>741528</project_id><text_data>*West Coast Mfg is a fabrication shop only and does not require a contractor&amp;#39;s license.**All work is performed off-site in shop at 1515 75th St SW, Everett, WA</text_data><comment_date>2015-03-02T00:00:00</comment_date></row><row _id="row-2tyq.h9k8~pnfg" _uuid="00000000-0000-0000-A56D-EA164C9BD001" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2tyq.h9k8~pnfg"><intent_id>844544</intent_id><project_id>791569</project_id><text_data>Concrete Work, No Finish Work</text_data><comment_date>2017-06-30T00:00:00</comment_date></row><row _id="row-7q34~kfp4~dnx2" _uuid="00000000-0000-0000-8A25-D8ABEE94FE07" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7q34~kfp4~dnx2"><intent_id>630779</intent_id><project_id>735414</project_id><text_data>Form filed by: Jesse Sawyer</text_data><comment_date>2014-05-21T00:00:00</comment_date></row><row _id="row-v6t7_66hg~9xvi" _uuid="00000000-0000-0000-45F6-682F86FD7BC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-v6t7_66hg~9xvi"><intent_id>884400</intent_id><project_id>806741</project_id><text_data>The subcontractor&amp;#39;s duties for this project were to bring playground material in their truck to the facility where everything was marked and ready for their guy (landscape construction) to take a hose and blow the product on the playground where they were told to.</text_data><comment_date>2018-01-22T00:00:00</comment_date></row><row _id="row-vu8m~95ki-4mz9" _uuid="00000000-0000-0000-C07E-FFAA2EA15709" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vu8m~95ki-4mz9"><intent_id>647678</intent_id><project_id>737467</project_id><text_data>Provide and install cabling for telephone and data use inside.</text_data><comment_date>2014-08-13T00:00:00</comment_date></row><row _id="row-jr3w_bq8n.iwmp" _uuid="00000000-0000-0000-8037-BC856DBD81CD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jr3w_bq8n.iwmp"><intent_id>858967</intent_id><project_id>831157</project_id><text_data>backbone cable was pulled from HS to stadium.drills were used to install foursquare boxes in booth.25 pair fiber cable installed for wifi system.</text_data><comment_date>2017-09-20T00:00:00</comment_date></row><row _id="row-edwk-xhkc.xqqi" _uuid="00000000-0000-0000-2CA5-D658CCCC83BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-edwk-xhkc.xqqi"><intent_id>986149</intent_id><project_id>871378</project_id><text_data>FILED BY TONY GRONLUND</text_data><comment_date>2019-06-19T00:00:00</comment_date></row><row _id="row-aep6_jgdp-25x8" _uuid="00000000-0000-0000-D0A4-60F98AADB086" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-aep6_jgdp-25x8"><intent_id>989545</intent_id><project_id>886313</project_id><text_data>09-19-050R</text_data><comment_date>2019-07-03T00:00:00</comment_date></row><row _id="row-rxak_e8wz-t9s3" _uuid="00000000-0000-0000-5075-FE1F9FEFC0D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rxak_e8wz-t9s3"><intent_id>824876</intent_id><project_id>815358</project_id><text_data>PTI SO 124146</text_data><comment_date>2017-04-05T00:00:00</comment_date></row><row _id="row-pdyz_acuw_pfd2" _uuid="00000000-0000-0000-9999-6F5B76E52EC2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pdyz_acuw_pfd2"><intent_id>519332</intent_id><project_id>677604</project_id><text_data>Electrial tools including drills &amp; skill saws &amp; sawzall</text_data><comment_date>2012-07-18T00:00:00</comment_date></row><row _id="row-uhff.w2cm_9buv" _uuid="00000000-0000-0000-D66C-DC4464EF4D00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uhff.w2cm_9buv"><intent_id>841696</intent_id><project_id>824839</project_id><text_data>OTHER TRUCKS (C.WA-760) FOR DUST CONTROL - WATER TANK TRUCK (0-8000 GALLONS)</text_data><comment_date>2017-06-19T00:00:00</comment_date></row><row _id="row-uek7-w49d_mmnn" _uuid="00000000-0000-0000-1BF1-C532F9715F9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uek7-w49d_mmnn"><intent_id>601728</intent_id><project_id>609628</project_id><text_data>Form filed by: Michael HummelState of WA - Dept. of L&amp;I - Prevailing Wage DivisionExemption Intent Questionnaire form - WSU Veterinary Medical Research BuildingPrevailing wage issues are very fact specific. In order for us to determine that the programming and commissioning exemption you claim for the project is appropriate, we need to know more about the project and the tasks your employees performed. Please provide us with the following information:******1. What is the specific purpose of this awarding agency's public works project?     Upgrade HVAC System.******2. Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project? No******3. Does this project entail the remodeling or new construction of a facility? Yes, but not performed by Siemens Employees.******4. If your firm is working upon a type of building system, what type of system is involved? HVAC control system.******5. What specific tasks did your employees perform? Siemens' BAU Technicians, perform their work strictly on laptop computers, both remotely and on-site during the automation commissioning process. While off-site, the BAU Technicians create a computerized schematic of a particular building�s HVAC automations system. That system is used to control the system�s functions after the mechanical commissioning process is complete. Like the creation of the schematic, the automation commissioning process is conducted using a laptop computer. The BAU Technician typically sits in a central control room and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn't appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the BAU Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, BAU Technicians do not use trade tools, such as drills or wrenches.******6. What, if any, tools did your employees use in the performance of those tasks? Laptop computer******7. If your employee used no tools, did they engage in any other type of manual, hands on efforts in completing their tasks? No - none.******8. Are you going to be hiring any subcontractors for this project? Yes.******To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form. To expedite our determination, please be as detailed as possible in responding to these questions. For instance, if you state that your work is &amp;quot;verification&amp;quot;, &amp;quot;commissioning&amp;quot; or similar work, specifically explain the specific tasks the process involves. Once we have this additional information, we will be in a better position to process your form.</text_data><comment_date>2013-10-28T00:00:00</comment_date></row><row _id="row-p2nj_2jgy.pjth" _uuid="00000000-0000-0000-649D-29D1C7B78CD1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p2nj_2jgy.pjth"><intent_id>1088222</intent_id><project_id>898450</project_id><text_data>FRINGE PAID IN CASH</text_data><comment_date>2020-09-15T00:00:00</comment_date></row><row _id="row-x8u2_tuu6_xw4p" _uuid="00000000-0000-0000-117C-724456CBEFFA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x8u2_tuu6_xw4p"><intent_id>1257330</intent_id><project_id>975197</project_id><text_data>#60105TRUCK DRIVER - OTHER' USED FOR TRUCK MOUNTED PICK UP SWEEPER AND/OR 2000-4000 GALLON WATER TRUCK</text_data><comment_date>2022-08-11T00:00:00</comment_date></row><row _id="row-jzsy_zxbk-ghx9" _uuid="00000000-0000-0000-9118-E1FAC1B4414E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jzsy_zxbk-ghx9"><intent_id>1169730</intent_id><project_id>975378</project_id><text_data>Amendment #4 added to allow as-needed services during contract year</text_data><comment_date>2021-08-17T00:00:00</comment_date></row><row _id="row-pe5x-qpuk_je5p" _uuid="00000000-0000-0000-1F5C-D445C454DCBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pe5x-qpuk_je5p"><intent_id>584115</intent_id><project_id>715454</project_id><text_data>Other truck is a 2007 Sterling Box Van, GWT of 16,000 pounds, for delivery of manufactured materials to jobsite.Work performed is offsite manufacturing in our Tacoma facility.</text_data><comment_date>2013-07-29T00:00:00</comment_date></row><row _id="row-h6yr_y8vi~fbaq" _uuid="00000000-0000-0000-8145-42FDD60AC8EB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h6yr_y8vi~fbaq"><intent_id>876051</intent_id><project_id>837986</project_id><text_data>Scope of work:  Mowing, edging, shrub pruning, brush pruning, weeding, planting bed maintenance, hard surface cleaning, operations of irrigation system, litter pick-up, garbage removal, leaf removal, and cover pruning.  Work excluded from contract, mulch installation, heavy or special pruning, graffiti removal, repair of irrigation system, thatching, aeration, and structural repairs.</text_data><comment_date>2017-11-21T00:00:00</comment_date></row><row _id="row-xdg5-z4h3_dscp" _uuid="00000000-0000-0000-E119-0A728E5F54D2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xdg5-z4h3_dscp"><intent_id>691958</intent_id><project_id>760634</project_id><text_data>The answers to the questions are as follows;1.Our firm was contracted to install a new electrical high voltage circuit for a Ductless Split-System Heat Pump2.The structure is a single-family dwelling3.The structure is a single-level home4.The building is used as a single-family residence, no to commercial use, no to retail use, yes to permanent residence, no to rehabilitation house, no to transitional housing, no to communal dining facility, no to treatment services, no to dormitories, no to counseling, no to each bed or room rented separately. 5.The dwelling unit has its own self-contained kitchen.6.The dwelling unit has it&amp;#39;s own bathroom7.There is no community facility or manager&amp;#39;s office8. No part of the structure is used by members of the public</text_data><comment_date>2015-04-30T00:00:00</comment_date></row><row _id="row-uufb-ti5u-gpzz" _uuid="00000000-0000-0000-4CCF-52148F9B69DB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uufb-ti5u-gpzz"><intent_id>946426</intent_id><project_id>866769</project_id><text_data>#1 Replace 2 wall heaters living room &amp; up stairs bedroom. #2 Single family dwelling stick frame. #3 2 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2018-11-17T00:00:00</comment_date></row><row _id="row-y55r-qmki~gtpg" _uuid="00000000-0000-0000-371A-5E52F281415D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y55r-qmki~gtpg"><intent_id>496375</intent_id><project_id>681175</project_id><text_data>Eileen Anderon6349 Blackfoot PlaceMaple Falls</text_data><comment_date>2012-01-10T00:00:00</comment_date></row><row _id="row-s4x5-n38z-x9ja" _uuid="00000000-0000-0000-9CDD-38B5629A8203" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s4x5-n38z-x9ja"><intent_id>722415</intent_id><project_id>763202</project_id><text_data>Guzmans Hauling is a tribal member owned company located on the Tulalip Reservation.</text_data><comment_date>2015-09-23T00:00:00</comment_date></row><row _id="row-8wmh_p9zq_6jva" _uuid="00000000-0000-0000-3BD0-5B347E2D5B18" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8wmh_p9zq_6jva"><intent_id>825510</intent_id><project_id>817667</project_id><text_data>Repairs to underground irrigation sprinklers at a maximum depth of 3 feet below finish grade and restore lawn area.  Hand tools such as shovels and rakes will be used.</text_data><comment_date>2017-04-10T00:00:00</comment_date></row><row _id="row-4xtm-ifuq.43fm" _uuid="00000000-0000-0000-4CF3-4D5720015A5E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4xtm-ifuq.43fm"><intent_id>518455</intent_id><project_id>690236</project_id><text_data>042135</text_data><comment_date>2012-06-22T00:00:00</comment_date></row><row _id="row-h3gu_mix7.77qb" _uuid="00000000-0000-0000-1963-7B7EC85473B9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h3gu_mix7.77qb"><intent_id>784577</intent_id><project_id>766820</project_id><text_data>Telephone and computer wiring inside fire station.</text_data><comment_date>2016-09-01T00:00:00</comment_date></row><row _id="row-cygk.kn3v.dspj" _uuid="00000000-0000-0000-766C-8F8F0F324277" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cygk.kn3v.dspj"><intent_id>1220753</intent_id><project_id>922544</project_id><text_data>JH Kelly hired us</text_data><comment_date>2022-03-25T00:00:00</comment_date></row><row _id="row-kmy9_nft7-3qd9" _uuid="00000000-0000-0000-8ED5-3823B6FB5F6B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kmy9_nft7-3qd9"><intent_id>693253</intent_id><project_id>761712</project_id><text_data>JOB# 64597 EVERGREEN SD / MARRION ELEMENTARY</text_data><comment_date>2015-05-07T00:00:00</comment_date></row><row _id="row-cvpv-q4qx_xmx5" _uuid="00000000-0000-0000-694C-E7EB99B73083" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cvpv-q4qx_xmx5"><intent_id>634536</intent_id><project_id>735937</project_id><text_data>GENERAL LABOR:  SHOVELING ROCK AND MANUAL LABOROTHER TRUCKS:  1,500 GAL DISTRIBUTOR HAULING TACK TO SHOOT ON ROADWAYOTHER TRUCKS:  5,000 GAL WATER TRUCK CARRING WATER TO WATER ROADWAY</text_data><comment_date>2014-06-11T00:00:00</comment_date></row><row _id="row-rzxf-7tgc.iq7v" _uuid="00000000-0000-0000-2278-447581B0A724" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rzxf-7tgc.iq7v"><intent_id>1050661</intent_id><project_id>901756</project_id><text_data>Used Davis Bacon Wages for Pierce County as they are higher than WAL&amp;I PW rates.</text_data><comment_date>2020-04-09T00:00:00</comment_date></row><row _id="row-ea8j-3mmr.4b5c" _uuid="00000000-0000-0000-2125-BAC2F1407262" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ea8j-3mmr.4b5c"><intent_id>1133351</intent_id><project_id>956797</project_id><text_data>9863898</text_data><comment_date>2021-04-02T00:00:00</comment_date></row><row _id="row-bad5-pdze-cs5w" _uuid="00000000-0000-0000-FF58-CCAAE9654B80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bad5-pdze-cs5w"><intent_id>469013</intent_id><project_id>608202</project_id><text_data>Owners performed the pressure washing work and exterior window cleaning work inside and outside.</text_data><comment_date>2011-09-01T00:00:00</comment_date></row><row _id="row-6kdx.ytvt.cyic" _uuid="00000000-0000-0000-59A4-5DEF126B8BC1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6kdx.ytvt.cyic"><intent_id>576181</intent_id><project_id>708175</project_id><text_data>Our duties for this project were to bring playground material in our truck to the facility where everything was marked and ready for our guy (landscape contruction) to take a hose and blow the product on the playground where they told us. No other tools, etc. are used.</text_data><comment_date>2013-06-26T00:00:00</comment_date></row><row _id="row-bair~vpbq_knyc" _uuid="00000000-0000-0000-2BCE-A8AAF3AF03A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bair~vpbq_knyc"><intent_id>810602</intent_id><project_id>810965</project_id><text_data>(1)INSULATION (2)WELL HOUSE (3)1-2 (4)A-NO, B-NO, C-NO, D-NO, E-NO, F-NO, G-NO, H-NO, I-NO, J-NO, K-? (5)NO (6)NO (7)YES (8)NO</text_data><comment_date>2017-01-10T00:00:00</comment_date></row><row _id="row-5twu.vq88_eefk" _uuid="00000000-0000-0000-FF96-8B0CD3A49C10" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5twu.vq88_eefk"><intent_id>779912</intent_id><project_id>784842</project_id><text_data>ALL fringe Benefits paid to Employees in cash form.</text_data><comment_date>2016-08-04T00:00:00</comment_date></row><row _id="row-ub9d~zde9_sjg8" _uuid="00000000-0000-0000-76DE-394E14D3458C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ub9d~zde9_sjg8"><intent_id>711521</intent_id><project_id>766427</project_id><text_data>Leibrant job 5 hours labor 7/22/2015</text_data><comment_date>2015-08-02T00:00:00</comment_date></row><row _id="row-39em-t8gi-s9qw" _uuid="00000000-0000-0000-E1A3-FCACF6228CBF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-39em-t8gi-s9qw"><intent_id>748036</intent_id><project_id>759597</project_id><text_data>We supply rock. We hired trucks to deliver the rock to the site.</text_data><comment_date>2016-03-01T00:00:00</comment_date></row><row _id="row-m6j2~2298-yrbe" _uuid="00000000-0000-0000-BB7D-7895A5707D1E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m6j2~2298-yrbe"><intent_id>815281</intent_id><project_id>813180</project_id><text_data>4. If we are to do a rehabilitation house it will be used for permanent residence.</text_data><comment_date>2017-02-21T00:00:00</comment_date></row><row _id="row-t7wd~3nsx_zdz2" _uuid="00000000-0000-0000-4DA0-213C539A894C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t7wd~3nsx_zdz2"><intent_id>987690</intent_id><project_id>885619</project_id><text_data>WRI Job # 19.041</text_data><comment_date>2019-06-26T00:00:00</comment_date></row><row _id="row-2j9g~3tcm.qx9b" _uuid="00000000-0000-0000-5B72-0C6636A6D03A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2j9g~3tcm.qx9b"><intent_id>1100131</intent_id><project_id>927468</project_id><text_data>Worker's compensation insurance through Oregon SAIF Corp Policy #625739, transferrable to Washington State</text_data><comment_date>2020-10-30T00:00:00</comment_date></row><row _id="row-jpqw-c756.xguf" _uuid="00000000-0000-0000-8983-F1C4E3DB9A54" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jpqw-c756.xguf"><intent_id>635456</intent_id><project_id>714423</project_id><text_data>Health &amp; Welfare $7.55Pension $8.40Training $0.70Total $16.65</text_data><comment_date>2014-06-17T00:00:00</comment_date></row><row _id="row-9t4h_czxb~nhpn" _uuid="00000000-0000-0000-4441-14162E2771C2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9t4h_czxb~nhpn"><intent_id>796466</intent_id><project_id>804120</project_id><text_data>National pension $4.24International Training $.17NW Sheet Metal Pension $7.63NW Healthcare $11.64Apprentice Fund $1.10Industry Fund $.65Organizational Trust Fund $1.00NW Supplemental plan $.79Clean Card $.07</text_data><comment_date>2016-10-20T00:00:00</comment_date></row><row _id="row-vk2g_4a2m.cv69" _uuid="00000000-0000-0000-AC69-BDE094698891" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vk2g_4a2m.cv69"><intent_id>718379</intent_id><project_id>771406</project_id><text_data>Filed by Brian Balzli.</text_data><comment_date>2015-09-02T00:00:00</comment_date></row><row _id="row-etfj.y7e6.97rj" _uuid="00000000-0000-0000-FEF7-C2F019592570" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-etfj.y7e6.97rj"><intent_id>488312</intent_id><project_id>672712</project_id><text_data>Please change Replacemnet to Installation..it is a new build......thank you</text_data><comment_date>2011-11-09T00:00:00</comment_date></row><row _id="row-33mz_perd-3rkc" _uuid="00000000-0000-0000-6789-392840A92788" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-33mz_perd-3rkc"><intent_id>1091002</intent_id><project_id>823535</project_id><text_data>we are locator/scanners utilizing surveyor for the purpose of prevailing wage rates</text_data><comment_date>2020-09-25T00:00:00</comment_date></row><row _id="row-6sg7_isg7.wkdc" _uuid="00000000-0000-0000-6C85-449DC496CBA3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6sg7_isg7.wkdc"><intent_id>777036</intent_id><project_id>792340</project_id><text_data>Semi-Tractor with trailer.  Trailer is 60 CY End Dump</text_data><comment_date>2016-07-23T00:00:00</comment_date></row><row _id="row-ik6x-nm3m~jpeg" _uuid="00000000-0000-0000-824E-9542B6842BF0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ik6x-nm3m~jpeg"><intent_id>1238202</intent_id><project_id>1015876</project_id><text_data>Local Pens 13.75, Nation Pens 1.51, H&amp;W 13.09, Pref Retire H&amp;W 3.37, Train Trust 1.75, Train Trust ITF .10, PMCA .2, Scholarship .09, Educ Reim .18, Labor Mgmt Fund .10</text_data><comment_date>2022-06-02T00:00:00</comment_date></row><row _id="row-pem3.v4qn_zfhc" _uuid="00000000-0000-0000-643E-1E2C20D4C93D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pem3.v4qn_zfhc"><intent_id>1247776</intent_id><project_id>1005794</project_id><text_data>#1 Add venting to existing home#2 Condominium#3 2 Stories#4a No, b No, c Yes, d No, e No, f No, g No, h No, i No, j No, kNo, l No#5 Yes#6 Yes#7 Yes#8 No</text_data><comment_date>2022-07-11T00:00:00</comment_date></row><row _id="row-c6z2.pbgj-tn48" _uuid="00000000-0000-0000-016E-2CC1E65ACBC9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c6z2.pbgj-tn48"><intent_id>901681</intent_id><project_id>849582</project_id><text_data>OTHER TRUCKS - MOBILIZATION W/LOWBOY</text_data><comment_date>2018-04-30T00:00:00</comment_date></row><row _id="row-7i6m~hsy7-p4sb" _uuid="00000000-0000-0000-BC9C-01467CB047A4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7i6m~hsy7-p4sb"><intent_id>873552</intent_id><project_id>836928</project_id><text_data>Employees drive Chevy Silverado or similar to and from job siteGO - Pierce County Facilities SS 911 Com Center</text_data><comment_date>2017-11-07T00:00:00</comment_date></row><row _id="row-ezsv_naxn.ndtd" _uuid="00000000-0000-0000-403A-65C4E34BACFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ezsv_naxn.ndtd"><intent_id>1160100</intent_id><project_id>966560</project_id><text_data>Effective 8/01/2021, employees will be paid full prevailing wage, it will not be separated.  We have not started this project yet.</text_data><comment_date>2021-07-28T00:00:00</comment_date></row><row _id="row-c4q6_ayyq~ryyj" _uuid="00000000-0000-0000-D400-B77505EBA41E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c4q6_ayyq~ryyj"><intent_id>1146496</intent_id><project_id>963357</project_id><text_data>No.: M2107B</text_data><comment_date>2021-05-20T00:00:00</comment_date></row><row _id="row-3r5z.8da5~7cxx" _uuid="00000000-0000-0000-A62F-9355394180FB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3r5z.8da5~7cxx"><intent_id>1270040</intent_id><project_id>1025779</project_id><text_data>VE 16879</text_data><comment_date>2022-09-27T00:00:00</comment_date></row><row _id="row-43hu_q565-w4kq" _uuid="00000000-0000-0000-BFCF-966655B223E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-43hu_q565-w4kq"><intent_id>883906</intent_id><project_id>841711</project_id><text_data>This work was performed in December 2017. The prevailing wage at that time was $49.10, so the employees were paid $49.10.  The website is requiring me to enter &amp;quot;$50.88&amp;quot;, but that is not correct.</text_data><comment_date>2018-01-17T00:00:00</comment_date></row><row _id="row-bfeg_qgtm~ympq" _uuid="00000000-0000-0000-9401-63D5512FA7C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bfeg_qgtm~ympq"><intent_id>509568</intent_id><project_id>662820</project_id><text_data>Aggregate Hauling</text_data><comment_date>2012-04-27T00:00:00</comment_date></row><row _id="row-exiq.xggr.8bpr" _uuid="00000000-0000-0000-A5C2-2FFBDBCF67E7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-exiq.xggr.8bpr"><intent_id>864516</intent_id><project_id>833275</project_id><text_data>Truck Drivers:  Private Wage Exceeds Prevailing Wage</text_data><comment_date>2017-09-22T00:00:00</comment_date></row><row _id="row-j2yf~nkqz.hmfs" _uuid="00000000-0000-0000-985F-93CB603B3A2B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j2yf~nkqz.hmfs"><intent_id>1286237</intent_id><project_id>969941</project_id><text_data>121441-001</text_data><comment_date>2022-11-29T00:00:00</comment_date></row><row _id="row-yqse_4id4.x4fa" _uuid="00000000-0000-0000-07F4-308A7F470E3F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yqse_4id4.x4fa"><intent_id>996775</intent_id><project_id>878480</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install distribution cable for voice / data communications. Install copper cables for communications backbone between equipment rooms. Terminate cables in the equipment room and terminate the cables routed between Comm. equipment rooms.</text_data><comment_date>2019-08-02T00:00:00</comment_date></row><row _id="row-6bii_y5g6-9djc" _uuid="00000000-0000-0000-E0A9-63AA679C2955" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6bii_y5g6-9djc"><intent_id>660077</intent_id><project_id>745087</project_id><text_data>Duct sealing only. Sole Proprietor, 100% owner and operator.No employees.</text_data><comment_date>2014-10-14T00:00:00</comment_date></row><row _id="row-ggkv.fugf.zbsz" _uuid="00000000-0000-0000-E547-F0B9D0961F35" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ggkv.fugf.zbsz"><intent_id>898569</intent_id><project_id>848309</project_id><text_data>Filed by Ron Kreitzee</text_data><comment_date>2018-04-13T00:00:00</comment_date></row><row _id="row-qb72.6x9w~ku24" _uuid="00000000-0000-0000-7C98-BD9A908F1648" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qb72.6x9w~ku24"><intent_id>1368518</intent_id><project_id>1082054</project_id><text_data>Sita Enterprises Wheel in Mobile Park Phase 2- E-23-256756-1</text_data><comment_date>2023-10-01T00:00:00</comment_date></row><row _id="row-pqyk.93mv.tgbq" _uuid="00000000-0000-0000-445A-5B5E07DB1E88" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pqyk.93mv.tgbq"><intent_id>662840</intent_id><project_id>747654</project_id><text_data>Scope of work: deliver and installation of plant materials using shovels, picks, hand tools, buckets and Ford F550 truck.</text_data><comment_date>2014-10-28T00:00:00</comment_date></row><row _id="row-t3ue~bfh2.g8f7" _uuid="00000000-0000-0000-8650-19EA3A2DADCF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3ue~bfh2.g8f7"><intent_id>508581</intent_id><project_id>685900</project_id><text_data>Per bid plans, painter to apply 250 mils of Spraywall in wet well</text_data><comment_date>2012-04-20T00:00:00</comment_date></row><row _id="row-azse~ufrx_g4z5" _uuid="00000000-0000-0000-62D3-7AADCEF7AED8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-azse~ufrx_g4z5"><intent_id>1209864</intent_id><project_id>998543</project_id><text_data>1.Weatherization 2. single family 3. 1 4. Aa0 no b no, c yes, d no, e no, f no, g no, h no, i no, j no, k no, i no 5. yes 6. yes 7. no 8. No</text_data><comment_date>2022-02-08T00:00:00</comment_date></row><row _id="row-m46b~wye5-nbxn" _uuid="00000000-0000-0000-0DDD-37661EEE6FDD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-m46b~wye5-nbxn"><intent_id>1242700</intent_id><project_id>1006295</project_id><text_data>Job #3202</text_data><comment_date>2022-06-20T00:00:00</comment_date></row><row _id="row-dbez-aj32.n6mv" _uuid="00000000-0000-0000-A471-97C5E37BA208" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dbez-aj32.n6mv"><intent_id>742323</intent_id><project_id>783003</project_id><text_data>Install (3) cat 5e cables for computers and repair (2) existing computer network cables inside building.</text_data><comment_date>2016-01-25T00:00:00</comment_date></row><row _id="row-n2cw_qs2u~frnj" _uuid="00000000-0000-0000-4DB8-2FC2B9CD5235" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n2cw_qs2u~frnj"><intent_id>697584</intent_id><project_id>763570</project_id><text_data>Sink in art class was backed up.Cabled line to clear line.Men&amp;#39;s restroom toilet -Augured Toilet to clear blockage</text_data><comment_date>2015-06-01T00:00:00</comment_date></row><row _id="row-b9zh_2k6x~a2jg" _uuid="00000000-0000-0000-E9C4-0B4D7813AC64" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-b9zh_2k6x~a2jg"><intent_id>547474</intent_id><project_id>701008</project_id><text_data>Hauling bark and removal of debris is done by a 1 ton single axel truck with dump bed.</text_data><comment_date>2012-12-19T00:00:00</comment_date></row><row _id="row-taav_wsbb~nuax" _uuid="00000000-0000-0000-77AE-924E8FEF9DB3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-taav_wsbb~nuax"><intent_id>867358</intent_id><project_id>834411</project_id><text_data>All crew members who work as landscaping or planting laborers at Everett Housing Authority job sites will be paid a minimum of $14.13 per hour.</text_data><comment_date>2017-10-05T00:00:00</comment_date></row><row _id="row-bc58.ig6t-75dy" _uuid="00000000-0000-0000-8600-585569D593A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bc58.ig6t-75dy"><intent_id>1208799</intent_id><project_id>997880</project_id><text_data>The whole project is to take oil rags and totes to disposal.  General Laborer duties.  Picking up totes and transport to PRS.  2 laborers, one pick up truck and drum liner. Disposal only. Non-hazardous waste. Designated facility name is PRS Group, Inc. 3003 Taylor Way, Tacoma WA. 2 Totes of used absorbents (rags).</text_data><comment_date>2022-02-23T00:00:00</comment_date></row><row _id="row-iy8z-mt49-qm72" _uuid="00000000-0000-0000-B411-6A1754C1ED27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iy8z-mt49-qm72"><intent_id>912316</intent_id><project_id>853818</project_id><text_data>1. Painting roof coat2. Mobile3. 14. Residentiala. Nob. Noc. Yese. Nof. Nog. Noh. Noi. Noj. Nok. Nol. No5. Yes6. Yes7. No8. No</text_data><comment_date>2018-06-19T00:00:00</comment_date></row><row _id="row-qq87_6gmm.g684" _uuid="00000000-0000-0000-42F3-2A745B54AD58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qq87_6gmm.g684"><intent_id>1263260</intent_id><project_id>1029202</project_id><text_data>Notes:Make: Heatcraft Model: MOZ055L63CF Serial: T01E 00916 7-24-22 I was called to look at large walk-in freezer, warm. I had nobody just into my evaporator system or compressor. I found that the three pole circuit breaker was tripped and would not reset. Traced issue to possible compressor bad, will return in the morning to further troubleshoot. 7-25-22 I did follow up on walk-in freezer. Verified that the compressor is bad and needs replaced. I ordered compressor through thermal should be in Wednesday or Thursday at the latest. 7-28-22 I picked up parts. I recovered refrigerant from large walk-in freezer system. I removed and replaced the compressor, the three pole contactor, and filter dryer. I pulled vacuum on system and weighed in 404A until site glass cleared . I operated unit, system is working correctly at this time. I did add dye to the system for future reference in case we get a leak. I reset the defrost clock to the correct time. NOTE: I called Richard to lock up school. As of 215 he has not arrived as of yet.</text_data><comment_date>2022-09-01T00:00:00</comment_date></row><row _id="row-w9ux-9yak~hihb" _uuid="00000000-0000-0000-5BA7-EA1C2D0423BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-w9ux-9yak~hihb"><intent_id>885465</intent_id><project_id>842399</project_id><text_data>1 Year Eaton UPS and Battery Service Contract for SN:  EK201CBC08Service Contract includes: FL87NXXX-0080  Flex: 8 Hr Rsp, 7x24 Cvg Only0005NXXX-0080  UPS Preventive Maintenance, After Hours (7x24)0005NF240  Flooded Battery Preventive Maintenance, Any Time</text_data><comment_date>2018-01-26T00:00:00</comment_date></row><row _id="row-cfbj_9bfq-fi8q" _uuid="00000000-0000-0000-9905-344DCFABCAD4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cfbj_9bfq-fi8q"><intent_id>1179581</intent_id><project_id>969284</project_id><text_data>We had a majority ownership change in our company and it triggered Workers Comp to issue us a new account number. However, we have a number of open Intents that now say our Workers Compensation account has been closed. We need help updating those intents with the new account number.Our UBI is 602-232-311 and the new account number is 323,348-00</text_data><comment_date>2022-10-24T00:00:00</comment_date></row><row _id="row-4ayn~jssj-fb9g" _uuid="00000000-0000-0000-3B54-1409A945A8CC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ayn~jssj-fb9g"><intent_id>479967</intent_id><project_id>657305</project_id><text_data>We are an Oregon based company and do not work in the state of Washington 40 hrs a week, no Industrial Insurance Account ID.</text_data><comment_date>2011-09-23T00:00:00</comment_date></row><row _id="row-qgi7~9u3w_8gtm" _uuid="00000000-0000-0000-4108-DDA1CE407119" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qgi7~9u3w_8gtm"><intent_id>1238825</intent_id><project_id>1016238</project_id><text_data>Mason Conservation District address is 450 W Business Park Road Shelton Wa 98584</text_data><comment_date>2022-06-06T00:00:00</comment_date></row><row _id="row-vv9q-4hba_x2es" _uuid="00000000-0000-0000-0D15-F54C78C4F668" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vv9q-4hba_x2es"><intent_id>1164721</intent_id><project_id>930420</project_id><text_data>Install irrigation quick couplers, install plants, apply bark mulch - all ground / hand tools, no power equipment</text_data><comment_date>2021-07-29T00:00:00</comment_date></row><row _id="row-6hyp-p3wx_9jgt" _uuid="00000000-0000-0000-DC29-6E96502AE212" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6hyp-p3wx_9jgt"><intent_id>494031</intent_id><project_id>680160</project_id><text_data>General Decision Number: WA100053 11/25/2011  WA53Page 5 of 8 showsPLUM0026-008 06/01/2011Rates FringesPIPEFITTER (HVAC PipeInstallation Only)...............$ 40.87 20.30PIPEFITTER.......................$ 40.87 20.30Butthe wage plus the fringes from the Decision sum to les than the Wage Shown at L&amp;I bt 40&amp;#162; per hour. So, ass 40&amp;#162; to the Wage component to achieve the $61.57 dictated by L&amp;I's website.Wages = $41.27 plus $20.30Laborer, General - It matches!! Here at L&amp;I, it shows as $40.03. General Wage Desision shows $30.96 wages + $9.07 fringes = $40.03</text_data><comment_date>2011-12-19T00:00:00</comment_date></row><row _id="row-4qq2.ihip-hv4y" _uuid="00000000-0000-0000-0958-EBAB65963F00" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4qq2.ihip-hv4y"><intent_id>849562</intent_id><project_id>827965</project_id><text_data># S026559</text_data><comment_date>2017-07-24T00:00:00</comment_date></row><row _id="row-53em-txxm.r2a5" _uuid="00000000-0000-0000-ED7B-479A12F85979" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-53em-txxm.r2a5"><intent_id>744742</intent_id><project_id>777750</project_id><text_data>This project is replacing the old Lynndale Elementary School.  Specialized Landscaping, Inc. will install underground sprinkler system to a maximum depth of three feet; remove existing landscape beds and install plants, shrubs, groundcovers and trees in the new beds.  Place topsoil to a maximum depth of 6 inches. spread bark and/or mulch.   Equipment that may be used can include dozers less than 90hp; mini excavators less than 90hp; loaders less than 90 hp; and backhoes less than 90hp.</text_data><comment_date>2016-02-03T00:00:00</comment_date></row><row _id="row-937a.62z8-dnit" _uuid="00000000-0000-0000-A43F-22E79A4D35E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-937a.62z8-dnit"><intent_id>552338</intent_id><project_id>702215</project_id><text_data>Did not need water tank truck on job.</text_data><comment_date>2013-02-05T00:00:00</comment_date></row><row _id="row-gmqt_x7xj-st48" _uuid="00000000-0000-0000-8B77-C2C860286BEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gmqt_x7xj-st48"><intent_id>639716</intent_id><project_id>738855</project_id><text_data>Form filed by: Jill C Guess</text_data><comment_date>2014-07-08T00:00:00</comment_date></row><row _id="row-j9yq.d9qk~fem2" _uuid="00000000-0000-0000-F368-03C20BBFBDAC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j9yq.d9qk~fem2"><intent_id>879446</intent_id><project_id>839538</project_id><text_data>Install new cabling that cancan be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-12-15T00:00:00</comment_date></row><row _id="row-y92z-77ig~aatv" _uuid="00000000-0000-0000-B5A5-F022B1DCC691" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y92z-77ig~aatv"><intent_id>538624</intent_id><project_id>692276</project_id><text_data>Labor only, hand tools for planting.  Some is landscape on the street, some is general labor on the wetland planting.</text_data><comment_date>2012-10-08T00:00:00</comment_date></row><row _id="row-ydvh.azis-mf8x" _uuid="00000000-0000-0000-E4D4-D1991EE1A3B2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ydvh.azis-mf8x"><intent_id>572961</intent_id><project_id>712349</project_id><text_data>KELLY BULGER12012 232ND AVE CT EBUCKLEY, WA 98321</text_data><comment_date>2013-06-03T00:00:00</comment_date></row><row _id="row-26xn-q8q2.2ect" _uuid="00000000-0000-0000-ACAB-80DF2D38E96E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-26xn-q8q2.2ect"><intent_id>1521357</intent_id><project_id>1177639</project_id><text_data>Two workers will be on site with 12'Diesel chipper. One FT employee, One is a contractor we work with.</text_data><comment_date>2025-03-26T00:00:00</comment_date></row><row _id="row-9rih-heas-88yv" _uuid="00000000-0000-0000-B401-A706C444752D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9rih-heas-88yv"><intent_id>691468</intent_id><project_id>760499</project_id><text_data>We will be installing a Distributed Antenna System (DAS).  Work will be performed on all four floors of the building.  Scope includes installation of coax and fiber cabling, installation of antennas and head-end gear.</text_data><comment_date>2015-04-29T00:00:00</comment_date></row><row _id="row-skv4_dept.jakd" _uuid="00000000-0000-0000-D823-9851F5DA3C7C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-skv4_dept.jakd"><intent_id>1283834</intent_id><project_id>1020821</project_id><text_data>0222050</text_data><comment_date>2022-11-15T00:00:00</comment_date></row><row _id="row-xizv-5znm.hz24" _uuid="00000000-0000-0000-6D96-94609B005E22" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xizv-5znm.hz24"><intent_id>714560</intent_id><project_id>770001</project_id><text_data>1)We were contracted to repair the AC 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2015-08-14T00:00:00</comment_date></row><row _id="row-zaa5-gcci.m4i2" _uuid="00000000-0000-0000-5534-AAF3C0D9028B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zaa5-gcci.m4i2"><intent_id>683544</intent_id><project_id>757530</project_id><text_data>Job # 21026-002</text_data><comment_date>2015-03-12T00:00:00</comment_date></row><row _id="row-6e9p~kzma_a6x5" _uuid="00000000-0000-0000-F7FA-BC92B8150538" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6e9p~kzma_a6x5"><intent_id>1150429</intent_id><project_id>965502</project_id><text_data>INV's 5538 &amp; 5660 - same building</text_data><comment_date>2021-06-07T00:00:00</comment_date></row><row _id="row-qfhe.bzph~smda" _uuid="00000000-0000-0000-402C-702CD3C1EF58" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qfhe.bzph~smda"><intent_id>710124</intent_id><project_id>766364</project_id><text_data>The work will consist of fish capture and relocation from stream sections isolated for construction.  The work will be performed by a certified fisheries professional and staff biologists.  The equipment used to perform the work will consist of an electrofisher and nets.</text_data><comment_date>2015-07-27T00:00:00</comment_date></row><row _id="row-xkeh~ek6x~46uf" _uuid="00000000-0000-0000-DAEF-533EB117B608" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xkeh~ek6x~46uf"><intent_id>696588</intent_id><project_id>763179</project_id><text_data>Installing a new heat pump. This is a single family residence, not used for business in any way. Single story. No commercial use, no retail, permananet residence only, no transitional housing, not used by members of the public.</text_data><comment_date>2015-05-27T00:00:00</comment_date></row><row _id="row-3t6m~hfiz-27iy" _uuid="00000000-0000-0000-A4DA-A8389DEA1CD7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3t6m~hfiz-27iy"><intent_id>568727</intent_id><project_id>663195</project_id><text_data>We will be installing hydroseed using a hydroseed installation truck. Seed is per specs on designated, prepared area. Hydroseed is a one step process.</text_data><comment_date>2013-05-09T00:00:00</comment_date></row><row _id="row-969k-hz5k_dwjm" _uuid="00000000-0000-0000-F083-CE6F7B7232AD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-969k-hz5k_dwjm"><intent_id>1202337</intent_id><project_id>993681</project_id><text_data>122064-001</text_data><comment_date>2022-01-04T00:00:00</comment_date></row><row _id="row-6iyv.5ewj_cmts" _uuid="00000000-0000-0000-26C0-2B3C333E166D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6iyv.5ewj_cmts"><intent_id>963711</intent_id><project_id>874844</project_id><text_data>other trucks include a lowboy under 50 ton</text_data><comment_date>2019-03-06T00:00:00</comment_date></row><row _id="row-2ccz.pnxp-66um" _uuid="00000000-0000-0000-B3EB-9FDB7779EB12" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2ccz.pnxp-66um"><intent_id>446079</intent_id><project_id>662020</project_id><text_data>Up to 20 Weatherization jobs for this intent.</text_data><comment_date>2011-03-07T00:00:00</comment_date></row><row _id="row-4zqx~jdj3~gecb" _uuid="00000000-0000-0000-8436-9571FA694BA9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4zqx~jdj3~gecb"><intent_id>888795</intent_id><project_id>828458</project_id><text_data>HIRED BY SUB HAMILTON CONSTR</text_data><comment_date>2018-02-16T00:00:00</comment_date></row><row _id="row-bpgb_wkyk_3rem" _uuid="00000000-0000-0000-B471-408CE9D5E979" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bpgb_wkyk_3rem"><intent_id>495209</intent_id><project_id>669647</project_id><text_data>Provide services and otherwise do all things necessary for or incidental to the performance of work for Marine and Inland Water Incidental, Land Based Incidents, Diving and Salvage Operations and Transportation, Storage and Disposal of harardous waste.</text_data><comment_date>2011-12-30T00:00:00</comment_date></row><row _id="row-y5u6_3uts~vmey" _uuid="00000000-0000-0000-79A6-33FF32E12356" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-y5u6_3uts~vmey"><intent_id>561034</intent_id><project_id>701253</project_id><text_data>We are an Oregon company with temporary workers in Washington. Our Oregon Worker's Compensation policy covers all employees working in Washington.</text_data><comment_date>2013-03-21T00:00:00</comment_date></row><row _id="row-wwkj-46qf-5z6a" _uuid="00000000-0000-0000-A768-553922D7FAEA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wwkj-46qf-5z6a"><intent_id>658751</intent_id><project_id>745974</project_id><text_data>Surface High Jump and Long Jump</text_data><comment_date>2014-10-06T00:00:00</comment_date></row><row _id="row-3cgq_5s5a_t3vf" _uuid="00000000-0000-0000-D6F2-6E58CD0BC736" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3cgq_5s5a_t3vf"><intent_id>840167</intent_id><project_id>824231</project_id><text_data>General Laborer: Performs work of shoveling with a hand shovel, cleaning/sweeping with a hand broom, heating joints with a Falmo, Tacking using a tack bucket and broom.Other Trucks: A Low Boy trailer used for delivery and pick up of equipment, International Distributor Tack Truck 2,000 gallon, Water Truck 4,000 gallon</text_data><comment_date>2017-06-13T00:00:00</comment_date></row><row _id="row-6cxs.9erz~yazx" _uuid="00000000-0000-0000-58A2-37676A14B9A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6cxs.9erz~yazx"><intent_id>1044481</intent_id><project_id>911875</project_id><text_data>Install 3 ethernet telephone wires in the Short Stay Unit within the existing building</text_data><comment_date>2020-03-10T00:00:00</comment_date></row><row _id="row-eq5y~c84w-ipiu" _uuid="00000000-0000-0000-51D6-7BE89EB49CED" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eq5y~c84w-ipiu"><intent_id>613894</intent_id><project_id>728138</project_id><text_data>Filed by Jim Short</text_data><comment_date>2014-01-28T00:00:00</comment_date></row><row _id="row-nrfa-re5h-6w7p" _uuid="00000000-0000-0000-D2B3-DB8529C93FF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nrfa-re5h-6w7p"><intent_id>812079</intent_id><project_id>811675</project_id><text_data>Hang, gas pipe and vent a 40&amp;#39; natural gas radiant tube heater.</text_data><comment_date>2017-02-07T00:00:00</comment_date></row><row _id="row-5xv3~8few~qqae" _uuid="00000000-0000-0000-89B9-098D6A58A9A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5xv3~8few~qqae"><intent_id>545423</intent_id><project_id>700083</project_id><text_data>C10261</text_data><comment_date>2012-11-20T00:00:00</comment_date></row><row _id="row-dv8k-usii-3t4q" _uuid="00000000-0000-0000-6475-4264B28165CA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dv8k-usii-3t4q"><intent_id>745688</intent_id><project_id>770442</project_id><text_data>Filed by Jyl Furney</text_data><comment_date>2016-02-09T00:00:00</comment_date></row><row _id="row-qmz3.8cpx-ehfg" _uuid="00000000-0000-0000-CFA2-40C4CCBC67C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qmz3.8cpx-ehfg"><intent_id>1114277</intent_id><project_id>847594</project_id><text_data>1.Holroyd Co., Inc. does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and 2.Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept. of Labor &amp; Industries for concrete mixer &amp; dump trucks are correct.</text_data><comment_date>2021-01-11T00:00:00</comment_date></row><row _id="row-drd4_k8kn_wq4p" _uuid="00000000-0000-0000-53A8-F5A838B095C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-drd4_k8kn_wq4p"><intent_id>1368523</intent_id><project_id>1089922</project_id><text_data>9926486</text_data><comment_date>2023-10-01T00:00:00</comment_date></row><row _id="row-kujj~8exp.egiv" _uuid="00000000-0000-0000-F350-022509BC98C3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kujj~8exp.egiv"><intent_id>518682</intent_id><project_id>690309</project_id><text_data>Question #1. Structure is a single family dwelling.         #2. 1.5         #3. A. Yes B. No C.Yes D.No E.No F.No          #4 Yes         #5 Yes         #6 No         #7 No</text_data><comment_date>2012-07-19T00:00:00</comment_date></row><row _id="row-722f~fc88~7kxw" _uuid="00000000-0000-0000-F05B-2E4B123C71A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-722f~fc88~7kxw"><intent_id>541565</intent_id><project_id>694494</project_id><text_data>Install metal fascia coverings and drip counter flashings @ Eaves and rakes.</text_data><comment_date>2012-10-25T00:00:00</comment_date></row><row _id="row-7njh-u264_jpxi" _uuid="00000000-0000-0000-0E50-B0635367F6A1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7njh-u264_jpxi"><intent_id>685979</intent_id><project_id>758575</project_id><text_data>Job # 200143-001</text_data><comment_date>2015-03-26T00:00:00</comment_date></row><row _id="row-rhc2-d26y~bgbg" _uuid="00000000-0000-0000-A926-6590B8AD4201" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rhc2-d26y~bgbg"><intent_id>678627</intent_id><project_id>754643</project_id><text_data>My name is Shad Dawes and I am the owner/operator of First Class Flooring. I am a journeyman soft floor layer and the only employee I will have on this project is an apprentice working under my direct supervision.</text_data><comment_date>2015-02-10T00:00:00</comment_date></row><row _id="row-xc4f-z6m9_yisx" _uuid="00000000-0000-0000-A52F-256FE110111C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xc4f-z6m9_yisx"><intent_id>1249412</intent_id><project_id>1022088</project_id><text_data>Fringe BreakdownPower Equipment Operators: Shovel, Excavator, Backhoe, Tractors Under 15 Metric Tons &amp; Loaders, Overhead Under 6 Yards &amp; Dozers D-9 &amp; Under &amp; Dump Truck/Trailer Drivers &amp; Gradechecker/Stakeman = Health &amp; Security $7.32 + Pension $16.15 + Apprentice/Training $0.75  Laborers - Underground Sewer &amp; Water: Pipe Layer &amp; General Laborer/Topman: Health &amp; Security $9.32 + Pension $6.34 + Apprentice/Training $0.05</text_data><comment_date>2022-07-15T00:00:00</comment_date></row><row _id="row-izt9_rtgc~kqjj" _uuid="00000000-0000-0000-2D74-D7E1CC329CB6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-izt9_rtgc~kqjj"><intent_id>613898</intent_id><project_id>728140</project_id><text_data>Filed by Michael Hummel1.) What was is the purpose of this project?Update the security alarm system and access controls for all Kent School District schools and administrative buildings.2.) Does this project include the fabrication, delivery, or installation of a non-standard item(s) fabricated according to specifications specifically for a public works project?No.3.) Does the project entail the remodeling or new construction of a facility? No.4.) If your firm is working upon a type of building system, what type of system is involved?Burglar alarm system.5.) What specific tasks did your employees perform?Siemen�s SES Technicians, perform their work strictly on laptop computers, both remotely and on-site during the commissioning process. While off-site, the SES Technicians update program configurations and point inputs. The SES Technician typically sits in at control panel and manipulates the system using a computer program. The program itself informs the Technician whether various components are functioning properly as they are triggered. If a component doesn�t appear to be functioning properly, the Technician will typically advise the applicable subcontractor about the problem and recheck the system once the problem is rectified. After confirming that the automation system is operating properly, the SES Technician trains the end-user about automation system functionality, again using a computer interface. Importantly, SES Technicians do not use trade tools, such as drills or wrenches.6.) What, in any, tools did your employees use in the performance of those tasks?Laptop computer7.) If your employees used no tools, did they engage in any other type of manual, hands-on efforts in completing their tasks? No � none.8.) Are you going to be hiring any subcontractors for this project? Yes.</text_data><comment_date>2014-01-28T00:00:00</comment_date></row><row _id="row-k2wh~tri9.rszq" _uuid="00000000-0000-0000-FEE5-0757E3630452" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k2wh~tri9.rszq"><intent_id>726481</intent_id><project_id>781980</project_id><text_data>final clean up on construction project</text_data><comment_date>2016-03-03T00:00:00</comment_date></row><row _id="row-du85_egqb.djtv" _uuid="00000000-0000-0000-C41E-4F8ACB233CCB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-du85_egqb.djtv"><intent_id>1530348</intent_id><project_id>1180441</project_id><text_data>TRUCK - USED TO DELIVER PRODUCT TO THE JOBSITEMAKE - GMC, YEAR - 2005, MODEL - C7500, WEIGHT - 26,000</text_data><comment_date>2025-04-25T00:00:00</comment_date></row><row _id="row-u9pf~7f7d~rjpz" _uuid="00000000-0000-0000-5280-15FCF5402D39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u9pf~7f7d~rjpz"><intent_id>823190</intent_id><project_id>816701</project_id><text_data>#1 - Install mini split ductless heat pump #2 - single family dwelling #3 - 2 stories #4 - What is the building used for?: (a) No (b) NO (c) Yes (d) No (e) No (f) No (g) NO (h) No (I) No (j) No (k) NO (l) NO #5 - Yes #6 - Yes #7 - No #8 - No</text_data><comment_date>2017-03-28T00:00:00</comment_date></row><row _id="row-5292-g93r_qtgw" _uuid="00000000-0000-0000-787B-165583CC676F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5292-g93r_qtgw"><intent_id>870752</intent_id><project_id>835767</project_id><text_data>Job # 16-517-13 Elkington Abatement</text_data><comment_date>2017-10-23T00:00:00</comment_date></row><row _id="row-a6i9-2wpe-q55i" _uuid="00000000-0000-0000-6D1F-F9185C45D778" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a6i9-2wpe-q55i"><intent_id>552781</intent_id><project_id>697103</project_id><text_data>205 N. 8th st. Yakima,WA 98901</text_data><comment_date>2013-01-21T00:00:00</comment_date></row><row _id="row-nd6v~hi4i-q38y" _uuid="00000000-0000-0000-8820-4912764573E3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nd6v~hi4i-q38y"><intent_id>461114</intent_id><project_id>666911</project_id><text_data>NW Pension 6.93, National Pension 4.24, NW Heatlth 8.68, International Training .17, Apprenticeship Fund 1.00, Industry Fund .60, Organizational Trust Fund .75, Northwest Supplemental .79, Clean Card .07</text_data><comment_date>2011-06-16T00:00:00</comment_date></row><row _id="row-u48d.psxx_k2vb" _uuid="00000000-0000-0000-08A4-61BE4B788BCF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u48d.psxx_k2vb"><intent_id>866417</intent_id><project_id>834024</project_id><text_data>KCDA</text_data><comment_date>2017-10-02T00:00:00</comment_date></row><row _id="row-4i9m_kmx4.5fcd" _uuid="00000000-0000-0000-858D-DABFF54062A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4i9m_kmx4.5fcd"><intent_id>1199428</intent_id><project_id>939913</project_id><text_data>Project # 122006 - Portland- Fringe : Health = $15.88- Pension =$10.46- Education =$0.64 - Preservation $0.54- 401K =$8.85- Vacation = $4.64 - Holiday = $1.91  ($42.92) Total is rounding</text_data><comment_date>2021-12-15T00:00:00</comment_date></row><row _id="row-9kb6_7miv~a3i5" _uuid="00000000-0000-0000-CC40-EDC24E0694B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9kb6_7miv~a3i5"><intent_id>1015170</intent_id><project_id>893492</project_id><text_data>construction of apartment building  2. yes 3. three story apartment 4. multi family housing item c 5. yes 6. yes 7. yes 8. no</text_data><comment_date>2019-10-14T00:00:00</comment_date></row><row _id="row-j993_j2gc~ty8j" _uuid="00000000-0000-0000-A644-C68F3B5EB24D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j993_j2gc~ty8j"><intent_id>1358483</intent_id><project_id>1084414</project_id><text_data>Fringes: Vacation $5.50, Assessment $1.30, Insurance $9.46, Pension $14.26, Training $1.88, Industry Improvement $.50</text_data><comment_date>2023-08-28T00:00:00</comment_date></row><row _id="row-twxr~cdbd~4djm" _uuid="00000000-0000-0000-4F80-B88F3282D907" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-twxr~cdbd~4djm"><intent_id>1066277</intent_id><project_id>860697</project_id><comment_date>2020-06-18T00:00:00</comment_date></row><row _id="row-ayfp.2ppm.ghc9" _uuid="00000000-0000-0000-30F6-BD8F3948B4D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ayfp.2ppm.ghc9"><intent_id>513252</intent_id><project_id>686299</project_id><text_data>We are an Oregon company with employees residing in Oregon Only.  We are not required to have an industrial Insurance acct.</text_data><comment_date>2012-05-23T00:00:00</comment_date></row><row _id="row-ruke_j3it-iffk" _uuid="00000000-0000-0000-C1F7-B44021E6306E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ruke_j3it-iffk"><intent_id>767192</intent_id><project_id>794027</project_id><text_data>assisted in removal of stuck pig in a leachate line at the county operated landfill.</text_data><comment_date>2016-06-20T00:00:00</comment_date></row><row _id="row-wxu8-2iur_wxj6" _uuid="00000000-0000-0000-95D6-97C998D25027" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wxu8-2iur_wxj6"><intent_id>909607</intent_id><project_id>852752</project_id><text_data>Monday May 14, 2018 Three Artech art handlers loaded by hand (1) metal and glass sculpture into a small box truck and secured for local delivery to Farrel-McWhirter Farm Park in Redmond WA. Sculpture was unloaded and installed onto pre-cast concrete pad, by hand and basic power tools.</text_data><comment_date>2018-06-07T00:00:00</comment_date></row><row _id="row-xmcw~8u8q_tria" _uuid="00000000-0000-0000-486D-867721B2D5FD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xmcw~8u8q_tria"><intent_id>640895</intent_id><project_id>739266</project_id><text_data>1. PV installation2.single family 3. 24. a) no, b)no, c) yes, d)no, e)no, f) no, g)no, h)no, i)no, j)no, k)no5. yes6. yes7. no8. no</text_data><comment_date>2014-07-14T00:00:00</comment_date></row><row _id="row-pnbs_fb9q.zykr" _uuid="00000000-0000-0000-9147-EA423D9CF52C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pnbs_fb9q.zykr"><intent_id>1112150</intent_id><project_id>890637</project_id><text_data>semi trucks using various trailer combinations to haul concrete girders</text_data><comment_date>2020-12-29T00:00:00</comment_date></row><row _id="row-463h-63pw-9mjq" _uuid="00000000-0000-0000-1058-1E679C0E4399" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-463h-63pw-9mjq"><intent_id>543316</intent_id><project_id>699217</project_id><text_data>Form filed by: H C Todhunter</text_data><comment_date>2012-11-06T00:00:00</comment_date></row><row _id="row-66f3.e3hu_akq5" _uuid="00000000-0000-0000-7411-E7E7847DC552" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-66f3.e3hu_akq5"><intent_id>705476</intent_id><project_id>766669</project_id><text_data>ITLLC Job # 202212.</text_data><comment_date>2015-07-16T00:00:00</comment_date></row><row _id="row-33ek-2ku8.jpz6" _uuid="00000000-0000-0000-BA0B-5BC2D464FC6F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-33ek-2ku8.jpz6"><intent_id>1040044</intent_id><project_id>909342</project_id><text_data>Prime Electric Job # 1005219</text_data><comment_date>2020-02-20T00:00:00</comment_date></row><row _id="row-cb25.kkui_bgkv" _uuid="00000000-0000-0000-1737-AF48E641EF83" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cb25.kkui_bgkv"><intent_id>851136</intent_id><project_id>828604</project_id><text_data>Filed by Nicole Solberg</text_data><comment_date>2017-07-29T00:00:00</comment_date></row><row _id="row-reuh.rci3~85hq" _uuid="00000000-0000-0000-69BD-AD5D2CA610C0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-reuh.rci3~85hq"><intent_id>770869</intent_id><project_id>794039</project_id><text_data>086062</text_data><comment_date>2016-06-27T00:00:00</comment_date></row><row _id="row-75h7.agu5.t3v7" _uuid="00000000-0000-0000-0379-A7917A89AB80" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-75h7.agu5.t3v7"><intent_id>935208</intent_id><project_id>862308</project_id><text_data>PC1 - Job #5153Project 16-00026CB</text_data><comment_date>2018-09-25T00:00:00</comment_date></row><row _id="row-a2dr.2eis_9edn" _uuid="00000000-0000-0000-86B4-E91E7A860623" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a2dr.2eis_9edn"><intent_id>519660</intent_id><project_id>689091</project_id><text_data>Fringe benefit info: Medical $1.20/hour, Retirement (SIMPLE IRA) 3% of gross wage, Vacation $0.96(12 days/year)</text_data><comment_date>2012-06-28T00:00:00</comment_date></row><row _id="row-gzvm_avjh~yhni" _uuid="00000000-0000-0000-5D3C-699753F8D83D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gzvm_avjh~yhni"><intent_id>917007</intent_id><project_id>842545</project_id><text_data>Will use landscape laborers to plant grass</text_data><comment_date>2018-07-10T00:00:00</comment_date></row><row _id="row-r93k-nvpd.pnjg" _uuid="00000000-0000-0000-3563-6F7EE3617CC7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r93k-nvpd.pnjg"><intent_id>812213</intent_id><project_id>811734</project_id><text_data>Chattaroy is in spokane county sorry it was marked wrong Alpha electric will do the work also located in Spokane Registration for Alpha Electric ALPHAEl972c4 and U B I 602 -273-862   Contract Amt paid to Alpha Electric 525.37</text_data><comment_date>2017-01-31T00:00:00</comment_date></row><row _id="row-ye24.g4yx_9erz" _uuid="00000000-0000-0000-0CE2-DBEE53E56DFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ye24.g4yx_9erz"><intent_id>773787</intent_id><project_id>758268</project_id><text_data>I do not know the entire scope of work for the General Contractor on this project.  The name indicates it has to do with road/bridge work.  Michels portion is to install a cured in place liner into an existing storm drain without excavation. Michels will perform all work through existing manholes.  Equipment will be pickups, flatbeds, and specialized installation equipment</text_data><comment_date>2016-07-15T00:00:00</comment_date></row><row _id="row-fcnr~h6df.wcei" _uuid="00000000-0000-0000-B485-C5FAE4F8911C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fcnr~h6df.wcei"><intent_id>1243465</intent_id><project_id>1011677</project_id><text_data>this works consists of installing concrete edges in some places where they were removed due to damage, for this we will use a wheelbarrow, shovel,a mixer and trowels</text_data><comment_date>2022-06-22T00:00:00</comment_date></row><row _id="row-zt8b_fpcd.kavp" _uuid="00000000-0000-0000-EB0E-DB8364E27249" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zt8b_fpcd.kavp"><intent_id>770814</intent_id><project_id>795430</project_id><text_data>The south Naches lift station is a large holding tank for the city of Naches.  This was a large tank and it took five loads to empty it.  The labor simply helped the septic truck operator moving the lids and handling the hose(s).  This is all done by hand.  No tools are used.  The truck driver operates the septic pump on the truck.</text_data><comment_date>2016-07-11T00:00:00</comment_date></row><row _id="row-5zte_3rrr~p68u" _uuid="00000000-0000-0000-BC5F-80C950A66BF8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5zte_3rrr~p68u"><intent_id>1009506</intent_id><project_id>894167</project_id><text_data>1119607</text_data><comment_date>2019-09-24T00:00:00</comment_date></row><row _id="row-3nc7.syxe-x6hu" _uuid="00000000-0000-0000-274B-B288D2D829C4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3nc7.syxe-x6hu"><intent_id>742282</intent_id><project_id>781269</project_id><text_data>302 E. &amp;quot;N&amp;quot; Street #41Yakima, WA 98901</text_data><comment_date>2016-01-18T00:00:00</comment_date></row><row _id="row-mepj-eu4x~tgif" _uuid="00000000-0000-0000-D90E-482C516BEE45" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mepj-eu4x~tgif"><intent_id>718826</intent_id><project_id>771603</project_id><text_data>Install new CAT5e and relocate existing voice/data cables and terminate on new patch panel in IDF and label for telephone system.  Work to be performed indoors</text_data><comment_date>2015-09-03T00:00:00</comment_date></row><row _id="row-sq5i.hk3j.mdfr" _uuid="00000000-0000-0000-20D1-AAEF14D364B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-sq5i.hk3j.mdfr"><intent_id>770857</intent_id><project_id>788266</project_id><text_data>Removing sidewalk - general laborer wages; Fixing irrigation and drainage system less than 18&amp;quot; deep - also installing catch basin and 208 pond piping.</text_data><comment_date>2016-06-26T00:00:00</comment_date></row><row _id="row-yfpq~pint_a3vt" _uuid="00000000-0000-0000-FDB2-80C1704953FE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yfpq~pint_a3vt"><intent_id>1015135</intent_id><project_id>854358</project_id><text_data>Filed by Debbie WagnerProject is exempt from state prevailing wage requirements based on the Housing Authority Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with David-Bacon wage requirements.</text_data><comment_date>2019-10-14T00:00:00</comment_date></row><row _id="row-gtsn.h8r7.xgwr" _uuid="00000000-0000-0000-5F3D-79A94F994632" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gtsn.h8r7.xgwr"><intent_id>1037054</intent_id><project_id>735578</project_id><text_data>This is filed to replace original filed Intent ID# 757343 that listed hiring contractor as Lydig Construction in error.Granite Construction was the hiring contractor.</text_data><comment_date>2020-02-09T00:00:00</comment_date></row><row _id="row-cs4g-iam7-y5h7" _uuid="00000000-0000-0000-1DFC-20E0DFA1AA75" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cs4g-iam7-y5h7"><intent_id>1208131</intent_id><project_id>996389</project_id><text_data>Skagit County job</text_data><comment_date>2022-01-31T00:00:00</comment_date></row><row _id="row-rxkg.n7mp.yhh4" _uuid="00000000-0000-0000-7564-03699E9937D0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-rxkg.n7mp.yhh4"><intent_id>590335</intent_id><project_id>718706</project_id><text_data>Fringe:H&amp;W $5.70 per hourPension $6.40 per hourOther:  $1.05 per hour</text_data><comment_date>2013-08-27T00:00:00</comment_date></row><row _id="row-3cqz~sbc3-kext" _uuid="00000000-0000-0000-3B4F-6B660003BCD0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3cqz~sbc3-kext"><intent_id>1041698</intent_id><project_id>910329</project_id><text_data>AIRTEST Job #18-1061-1</text_data><comment_date>2020-02-27T00:00:00</comment_date></row><row _id="row-iaky.e866~nytf" _uuid="00000000-0000-0000-E920-E5DA53307E0D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iaky.e866~nytf"><intent_id>1214651</intent_id><project_id>1001494</project_id><text_data>Workers Comp is through SAIF, policy 992918. Extraterritorial coverage in Washington.</text_data><comment_date>2022-03-01T00:00:00</comment_date></row><row _id="row-pb6r.p6yz~h777" _uuid="00000000-0000-0000-3976-83A70E77F3D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pb6r.p6yz~h777"><intent_id>1286969</intent_id><project_id>1030838</project_id><text_data>lakeside job# 0422164trucks - lowboy delivers asphalt rotomill to jobsite, sweeper driven to jobsite</text_data><comment_date>2022-12-01T00:00:00</comment_date></row><row _id="row-zqy3-di3n~vh5w" _uuid="00000000-0000-0000-2881-485D06C67CE1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zqy3-di3n~vh5w"><intent_id>460577</intent_id><project_id>489996</project_id><text_data>Truck Driver / Other Truck is used for Low Bed Heavy Trailer Truck Drivers. They mobilize the equipment to the job site.General Laborers � Assist the Foreman, Operators and Crew on projects. They use brooms, shovels and buckets. They do anything from filling the water coolers to sweeping up at a job site, whatever is needed to assist the crew.</text_data><comment_date>2011-06-14T00:00:00</comment_date></row><row _id="row-h743-x8rj~bd2b" _uuid="00000000-0000-0000-5A75-B39EB5305AE5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-h743-x8rj~bd2b"><intent_id>592231</intent_id><project_id>715719</project_id><text_data>Lawn seeding, Topsoil, not to exceed 6&amp;quot; depth, plant material installation, sprinkler irrigation, organic mulch</text_data><comment_date>2013-09-06T00:00:00</comment_date></row><row _id="row-5izs~y6b2~6g6j" _uuid="00000000-0000-0000-EEE9-DA9F61DD77FF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5izs~y6b2~6g6j"><intent_id>808433</intent_id><project_id>809938</project_id><text_data>242 800 00</text_data><comment_date>2016-12-29T00:00:00</comment_date></row><row _id="row-urti-72xb.uvdk" _uuid="00000000-0000-0000-B177-BC7BA5408E42" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-urti-72xb.uvdk"><intent_id>838549</intent_id><project_id>823578</project_id><text_data># S026426</text_data><comment_date>2017-06-06T00:00:00</comment_date></row><row _id="row-kywu.muu4~4mgk" _uuid="00000000-0000-0000-6F2D-C03F710F229C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kywu.muu4~4mgk"><intent_id>867435</intent_id><project_id>817013</project_id><text_data>Install new cabling that can be used for either telephone(Voice over Distance) or data(bits and bytes) connection within the telecommunications system. All work to be performed indoors.</text_data><comment_date>2017-10-06T00:00:00</comment_date></row><row _id="row-u3dc~xuxj.t373" _uuid="00000000-0000-0000-8988-55982C783399" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u3dc~xuxj.t373"><intent_id>1248829</intent_id><project_id>1021772</project_id><text_data>Job Number 0422111</text_data><comment_date>2022-07-13T00:00:00</comment_date></row><row _id="row-wqfh-pgxw-vbkq" _uuid="00000000-0000-0000-1D83-C6558DC8DADE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wqfh-pgxw-vbkq"><intent_id>815997</intent_id><project_id>811116</project_id><text_data>HIRED BY N P M CONSTRUCTION CO</text_data><comment_date>2017-02-15T00:00:00</comment_date></row><row _id="row-24mp~rhcp-ispe" _uuid="00000000-0000-0000-4F24-5EF5B88631A7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-24mp~rhcp-ispe"><intent_id>899161</intent_id><project_id>842015</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? #3 - Including any basement or garage, how many stories or levels does the structure have? #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? (b) Any retail use in the structure? (c) Permanent residence only? (d) Rehabilitation house? (e) Transitional housing? (f) Communal dining facility? (g) Treatment services? (h) Assisted living services? (I) Dormitories? (j) Counseling? (k) Is each room and/or bed in the structure rented separately? (l) Other? #5 - Does each dwelling unit have its own self-contained kitchen? #6 - Does each dwelling unit have its own bathroom? #7 - Is there a community facility or manager�s office on site? #8 - Is any part of the structure used by members of the public?</text_data><comment_date>2018-04-17T00:00:00</comment_date></row><row _id="row-bfyx.huyk~m6yb" _uuid="00000000-0000-0000-E595-237247158D31" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bfyx.huyk~m6yb"><intent_id>567979</intent_id><project_id>710320</project_id><text_data>Mulitple Clients</text_data><comment_date>2013-05-06T00:00:00</comment_date></row><row _id="row-kxxj_32ie.vn6e" _uuid="00000000-0000-0000-60DF-1E71B94BEB06" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-kxxj_32ie.vn6e"><intent_id>977723</intent_id><project_id>881083</project_id><text_data>#1 Install Wall heaters. #2 Single family dwelling stick frame. #3 1 story residential. #4(a) No. #4(b) No. #4(c) Yes #4(d) No. #4(e) No. #4(f) No. #4(g) No. #4(h) No. #4(i) No. #4(j) No. #4(k) No. #5 Yes 1 family residence kitchen. #6 Yes 1 family residence bathroom(s). #7 No N/A Manager office. #8 No Public.</text_data><comment_date>2019-05-14T00:00:00</comment_date></row><row _id="row-c4p7-42q7-6mja" _uuid="00000000-0000-0000-4771-349FB6D0A545" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c4p7-42q7-6mja"><intent_id>512448</intent_id><project_id>687851</project_id><text_data>no</text_data><comment_date>2012-05-17T00:00:00</comment_date></row><row _id="row-gabx_cjrm-zrcb" _uuid="00000000-0000-0000-FDBF-F633A618A2A6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gabx_cjrm-zrcb"><intent_id>806716</intent_id><project_id>806476</project_id><text_data>Clare and Jana Williams 2312 Walnut St Bellingham, WA 98225</text_data><comment_date>2016-12-12T00:00:00</comment_date></row><row _id="row-8wir-95tp-pr4g" _uuid="00000000-0000-0000-1A87-97CCFF3213C7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8wir-95tp-pr4g"><intent_id>603439</intent_id><project_id>722778</project_id><text_data>Form Filed By: Steve Titternes</text_data><comment_date>2013-11-07T00:00:00</comment_date></row><row _id="row-p4a7-zxvd~h9pu" _uuid="00000000-0000-0000-7E1A-A8069820F448" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p4a7-zxvd~h9pu"><intent_id>485050</intent_id><project_id>670051</project_id><text_data>WE ARE AN OREGON CORPORATION AND OUR WORKERS COMP COVERS US WHILE WE ARE WORKING IN WASHINGTON</text_data><comment_date>2011-10-21T00:00:00</comment_date></row><row _id="row-ujxx~x5uu_zr33" _uuid="00000000-0000-0000-9BC7-2ACFC7508776" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ujxx~x5uu_zr33"><intent_id>589069</intent_id><project_id>718260</project_id><text_data>RB Aviation Skills Center.</text_data><comment_date>2013-08-21T00:00:00</comment_date></row><row _id="row-byfg_mgp2_5pan" _uuid="00000000-0000-0000-32B4-24EFB845393D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-byfg_mgp2_5pan"><intent_id>477998</intent_id><project_id>668721</project_id><text_data>1. New HVAC system being installed in building.2. Remodeling.3. Technician work (specifically programming of sequences).4. Laptop.5. No.</text_data><comment_date>2011-09-14T00:00:00</comment_date></row><row _id="row-fcj5_xmmf~3ksz" _uuid="00000000-0000-0000-D149-F3E5F389157D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fcj5_xmmf~3ksz"><intent_id>849395</intent_id><project_id>801469</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Soft Flooring Installation #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? Apartment #3 - Including any basement or garage, how many stories or levels does the structure have? 3 #4 - What is the building used for? --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? NO (b) Any retail use in the structure? NO (c) Permanent residence only? YES (d) Rehabilitation house? NO (e) Transitional housing? NO (f) Communal dining facility? NO (g) Treatment services? NO (h) Dormitories? NO (i) Counseling? NO (j) Is each room and/or bed in the structure rented separately? YES (k) Other? #5 - Does each dwelling unit have its own self-contained kitchen? YES #6 - Does each dwelling unit have its own bathroom? YES #7 - Is there a community facility or manager�s office on site? YES #8 - Is any part of the structure used by members of the public? NO</text_data><comment_date>2017-07-21T00:00:00</comment_date></row><row _id="row-xyzz.izqw-wm6d" _uuid="00000000-0000-0000-18F1-188C425F31C5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xyzz.izqw-wm6d"><intent_id>597113</intent_id><project_id>719946</project_id><text_data>Filed by Kenneth J. Thomsen.</text_data><comment_date>2013-10-02T00:00:00</comment_date></row><row _id="row-t2hi.4k58~3rk9" _uuid="00000000-0000-0000-0B9E-6C89BF8F9514" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t2hi.4k58~3rk9"><intent_id>568737</intent_id><project_id>696390</project_id><text_data>Installing Category 6 telecommunications cabling in building as requested.</text_data><comment_date>2013-05-14T00:00:00</comment_date></row><row _id="row-gtm3-hbg8~cqjx" _uuid="00000000-0000-0000-8FCE-6CC3DCA667BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gtm3-hbg8~cqjx"><intent_id>951050</intent_id><project_id>867556</project_id><text_data>Labor and materials for installation of low-voltage telecommunications cabling inside school district buildings for the purpose of networking personal computers.</text_data><comment_date>2018-12-17T00:00:00</comment_date></row><row _id="row-feik~7pmh.e6jr" _uuid="00000000-0000-0000-EFE0-A2CCDABA64AA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-feik~7pmh.e6jr"><intent_id>601748</intent_id><project_id>721712</project_id><text_data>***This form is being approved on the basis of your statement that your employees perform no tasks which require the use of tools except a laptop computer. If it is later learned that the information you provided for the basis of this approval is not accurate we may issue a notice of violation against your company for filing a false document, see RCW 39.12.050, and your company may be subject to penalties issued pursuant to that statute, including the possibility of debarment from public work projects.***</text_data><comment_date>2013-11-19T00:00:00</comment_date></row><row _id="row-5isz~4ety_dvaz" _uuid="00000000-0000-0000-561C-8290A5665B4D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5isz~4ety_dvaz"><intent_id>1020411</intent_id><project_id>898914</project_id><text_data>Estimate #20899</text_data><comment_date>2019-11-07T00:00:00</comment_date></row><row _id="row-br7g~bvkh.zj7d" _uuid="00000000-0000-0000-2860-7A45C4F858D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-br7g~bvkh.zj7d"><intent_id>1157635</intent_id><project_id>969295</project_id><text_data>? Demarco Provide and install new cable supports in 1st floor Demarc ceiling and support existing cabling.o Clean up wall field and remove abandoned wire and cabling.? 2nd Floor Conference Room/ File Storage areao Remove, relocate, and reinstall existing voice, data, and coax cabling in the 2nd floor ceiling to allow room for new HVAC equipment per walkthrough.o Provide low voltage electrical permit and facilitate inspection.</text_data><comment_date>2021-07-02T00:00:00</comment_date></row><row _id="row-65d4_89at_j6ur" _uuid="00000000-0000-0000-E404-FE9990079C2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-65d4_89at_j6ur"><intent_id>690188</intent_id><project_id>760445</project_id><text_data>Low Income Single Family Insulation / Weatherization upgrade</text_data><comment_date>2015-04-21T00:00:00</comment_date></row><row _id="row-n3wb~y44m~jbqk" _uuid="00000000-0000-0000-4A36-A30F358CD36E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n3wb~y44m~jbqk"><intent_id>788895</intent_id><project_id>802317</project_id><text_data>Sub contractor hired:  EC Electric and Builder Hardware &amp; Suplly</text_data><comment_date>2016-09-13T00:00:00</comment_date></row><row _id="row-hi4r.n3rw_4z5t" _uuid="00000000-0000-0000-6441-1D96C62BCA3A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-hi4r.n3rw_4z5t"><intent_id>448230</intent_id><project_id>662968</project_id><text_data>539,235-01 - Industrial Insurance Acct # - looe235</text_data><comment_date>2011-04-04T00:00:00</comment_date></row><row _id="row-idyt~as6a_6agp" _uuid="00000000-0000-0000-40E2-52F4FF4693E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-idyt~as6a_6agp"><intent_id>513000</intent_id><project_id>669584</project_id><text_data>Industrial insurance account in Washington is not required because we are there on a temporary basis. We have Oregon workers comp and stop gap liability.</text_data><comment_date>2012-05-22T00:00:00</comment_date></row><row _id="row-f3kd.29gf.9jr9" _uuid="00000000-0000-0000-F30F-AE5707FA48E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f3kd.29gf.9jr9"><intent_id>756006</intent_id><project_id>789319</project_id><text_data>Replace furnace, Kelvinator</text_data><comment_date>2016-04-11T00:00:00</comment_date></row><row _id="row-dad2~8jj2-fn73" _uuid="00000000-0000-0000-C5D3-9F9FEF7959A5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dad2~8jj2-fn73"><intent_id>930409</intent_id><project_id>847971</project_id><text_data>Brown 2890 N Oak Harbor Rd #104 98277Paul 2651 Red River Rd 98248</text_data><comment_date>2018-09-04T00:00:00</comment_date></row><row _id="row-t3nn.yt8k-j4xm" _uuid="00000000-0000-0000-7942-06F84EE8A9E6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-t3nn.yt8k-j4xm"><intent_id>1075498</intent_id><project_id>926949</project_id><text_data>JAG</text_data><comment_date>2020-07-27T00:00:00</comment_date></row><row _id="row-qvsg~py3a~5wh2" _uuid="00000000-0000-0000-297E-BEC477159E60" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qvsg~py3a~5wh2"><intent_id>987418</intent_id><project_id>885521</project_id><text_data>S028874</text_data><comment_date>2019-06-25T00:00:00</comment_date></row><row _id="row-56sc.ucba.e9hv" _uuid="00000000-0000-0000-AF82-2E75A530D6E5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-56sc.ucba.e9hv"><intent_id>531581</intent_id><project_id>692117</project_id><text_data>Filed by Pete Arsenault</text_data><comment_date>2012-08-29T00:00:00</comment_date></row><row _id="row-svir~vxqc.r3s8" _uuid="00000000-0000-0000-E41A-DBF62AAE6C9C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-svir~vxqc.r3s8"><intent_id>942670</intent_id><project_id>844441</project_id><text_data>Cleaning the car deck on the MV Elwha,using non pressurized autos scrubbing machine.</text_data><comment_date>2018-10-29T00:00:00</comment_date></row><row _id="row-5j7f.3wpw_ebmd" _uuid="00000000-0000-0000-EB16-269B3F672CD0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5j7f.3wpw_ebmd"><intent_id>486798</intent_id><project_id>666125</project_id><text_data>Heavy haul trucks hauling concrete bridge girders with steer trailer.</text_data><comment_date>2011-11-01T00:00:00</comment_date></row><row _id="row-4z6a.tsvh~f9en" _uuid="00000000-0000-0000-F41C-187FA2794D1B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4z6a.tsvh~f9en"><intent_id>1020593</intent_id><project_id>899005</project_id><comment_date>2019-11-07T00:00:00</comment_date></row><row _id="row-fvpr.9wjd-52ve" _uuid="00000000-0000-0000-200E-B5E3A092F6A8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fvpr.9wjd-52ve"><intent_id>1510572</intent_id><project_id>1171074</project_id><text_data>Everett - Annual Maintenance 2024Fringe Benefits: Health Plan $16.175 Pension Plan 10.860 Educational Fund 0.75 Preservation Fund 1.30 Annuity 10.10 Vacation/Holiday $7.33 = 46.52 Rounded</text_data><comment_date>2025-02-18T00:00:00</comment_date></row><row _id="row-j5at.j9ti-mv3m" _uuid="00000000-0000-0000-AE4C-DAD59E667989" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-j5at.j9ti-mv3m"><intent_id>1510647</intent_id><project_id>1171108</project_id><text_data>9964129</text_data><comment_date>2025-02-18T00:00:00</comment_date></row><row _id="row-2bsk-937f.xjh2" _uuid="00000000-0000-0000-0F28-C79129B19DB9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2bsk-937f.xjh2"><intent_id>1510706</intent_id><project_id>1171150</project_id><text_data>9964906</text_data><comment_date>2025-02-18T00:00:00</comment_date></row><row _id="row-4den.28x9-6ffh" _uuid="00000000-0000-0000-6CE1-33A19F759768" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4den.28x9-6ffh"><intent_id>1510691</intent_id><project_id>1171137</project_id><text_data>9963732</text_data><comment_date>2025-02-18T00:00:00</comment_date></row><row _id="row-zxtg-4ayn~g3kf" _uuid="00000000-0000-0000-F49D-07577BE6A5F8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-zxtg-4ayn~g3kf"><intent_id>1007984</intent_id><project_id>893597</project_id><text_data>We will be installing compost or bark mulch as a topdressing to finish off the landscaped beds and our work falls under the landscape Maintenance category. Our laborers are responsible for backpack blower cleanup and will be paid according to the rates published for landscaping and planting laborer. The operator of the blower truck will be paid according to the oil distribution / mulch distribution power equipment operator category. Please approve this intent as filed. Thank you for your assistance.</text_data><comment_date>2019-10-08T00:00:00</comment_date></row><row _id="row-d74y_fqhg~esny" _uuid="00000000-0000-0000-1C0A-D20E36202698" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d74y_fqhg~esny"><intent_id>718537</intent_id><project_id>766393</project_id><text_data>HIRED BY LEE CONTRACTORS</text_data><comment_date>2015-09-02T00:00:00</comment_date></row><row _id="row-7trf_6f8p~qyxq" _uuid="00000000-0000-0000-357A-188C9F40B561" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7trf_6f8p~qyxq"><intent_id>1203963</intent_id><project_id>983779</project_id><text_data>Fence install</text_data><comment_date>2022-01-11T00:00:00</comment_date></row><row _id="row-xt3x~ua26_4pjg" _uuid="00000000-0000-0000-C20C-25A271F9808E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xt3x~ua26_4pjg"><intent_id>1144943</intent_id><project_id>962532</project_id><text_data>Other Truck- International 1996 4,000 gallon water truck.</text_data><comment_date>2021-05-16T00:00:00</comment_date></row><row _id="row-c9bm-zbtu-mvf3" _uuid="00000000-0000-0000-86E6-E1DFA0CB06BD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c9bm-zbtu-mvf3"><intent_id>697147</intent_id><project_id>763401</project_id><text_data>(1)INSULATION (2)SINGLE FAMILY DWELLING, (3) 1-2 (4) A-NO,B-NO,C-YES, D-NO,E-NO,F-NO,G-NO,H-NO, I-NO,J-NO,K-? (5)YES (6)YES (7)NO (8)NO</text_data><comment_date>2015-05-28T00:00:00</comment_date></row><row _id="row-br8j-8hr3_xd8t" _uuid="00000000-0000-0000-6609-10274F9549A2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-br8j-8hr3_xd8t"><intent_id>929451</intent_id><project_id>860131</project_id><text_data>(1)INSULATION (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO, B-NO, C-YES, D-NO, E-NO, F-NO, G-NO, H-NO, I-NO, J-NO, K-? (5)YES (6)YES (7)NO (8)NO(1)WINDOWS (2)SINGLE FAMILY DWELLING (3)1-2 (4)A-NO, B-NO, C-YES, D-NO, E-NO, F-NO, G-NO, H-NO, I-NO, J-NO, K-? (5)YES (6)YES (7)NO (8)NO</text_data><comment_date>2018-08-29T00:00:00</comment_date></row><row _id="row-qy2g_vv83_f9ef" _uuid="00000000-0000-0000-7A5F-1625091CFC2A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qy2g_vv83_f9ef"><intent_id>705305</intent_id><project_id>764307</project_id><text_data>We are a temporary labor agency and are therefore excempt from obtaining a contractor&amp;#39;s license.</text_data><comment_date>2015-07-06T00:00:00</comment_date></row><row _id="row-k5av~pbxf_fbf5" _uuid="00000000-0000-0000-1FAB-5EDB75A56E1A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k5av~pbxf_fbf5"><intent_id>1215572</intent_id><project_id>1002137</project_id><text_data>sr51491840</text_data><comment_date>2022-03-04T00:00:00</comment_date></row><row _id="row-6q2k.84k6_3579" _uuid="00000000-0000-0000-09E5-7EAEE3D68269" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6q2k.84k6_3579"><intent_id>581504</intent_id><project_id>710266</project_id><text_data>Linoleum, carpet &amp; soft tile applicators local union no. 1236</text_data><comment_date>2013-07-16T00:00:00</comment_date></row><row _id="row-eumw~enhr-4qk3" _uuid="00000000-0000-0000-64EF-DAFED22F7657" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-eumw~enhr-4qk3"><intent_id>1133719</intent_id><project_id>957014</project_id><text_data>09-21-014N</text_data><comment_date>2021-04-05T00:00:00</comment_date></row><row _id="row-2qkw.jcnu_z42i" _uuid="00000000-0000-0000-B0DB-CA103726C2E8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2qkw.jcnu_z42i"><intent_id>452534</intent_id><project_id>664332</project_id><text_data>One of the Journey Level Soft Floor Layers counted above is a more than 30% owner.</text_data><comment_date>2011-05-03T00:00:00</comment_date></row><row _id="row-xqg7_7te4.bs57" _uuid="00000000-0000-0000-295A-9C9EF416CE39" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xqg7_7te4.bs57"><intent_id>923798</intent_id><project_id>858022</project_id><text_data>Job # 16398</text_data><comment_date>2018-08-07T00:00:00</comment_date></row><row _id="row-suc6_ii9m_qxm4" _uuid="00000000-0000-0000-682C-E2BDBAE4E74C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-suc6_ii9m_qxm4"><intent_id>865006</intent_id><project_id>830470</project_id><text_data>We will do the landscaping modifications to site areas at the school remodel construction. We are restoring landscaping, irrigation, sod, bark, beds with trees and shrubs after construction. Using hand tools such as shovels, rakes, pipe cutters &amp; etc. Equipment was under the 90 HP � mini excavator to trench and mini loader.</text_data><comment_date>2017-09-25T00:00:00</comment_date></row><row _id="row-x6n6~hc8y.fgyx" _uuid="00000000-0000-0000-1689-D3994490DF9F" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x6n6~hc8y.fgyx"><intent_id>1137953</intent_id><project_id>891707</project_id><text_data>Employees will be using a Ford E350 Cube Van (14' box truck, 12,000GVW) to haul material and equipment to the job site and debris back to the warehouse.On 3/31/21 we sold Sturm Heating Inc to Brennan Sierra Air and became DBA Sturm Heating and Air Conditioning on 4/01/21. We had already filed our Affidavit on this job for Sturm Heating on 3/11/21 reporting all hours worked on the project as Sturm Heating Inc. However, we had to return to the job site to complete warranty work, so we are filing this Intent for Sturm Heating and A/C so that those warranty hours can be reported. We did have a subcontractor (DKB Inc.) on this job but they finished their work while we were still Sturm Heating, so I selected 'No Subcontractors' on this form since they will not be doing any additional work for us under the new company.</text_data><comment_date>2021-04-22T00:00:00</comment_date></row><row _id="row-qgri_mih6_iuws" _uuid="00000000-0000-0000-A638-AF80CBB9EFF6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qgri_mih6_iuws"><intent_id>664163</intent_id><project_id>748200</project_id><text_data>Form filed by: Fred Anderson</text_data><comment_date>2014-11-05T00:00:00</comment_date></row><row _id="row-fyfs.543h.6csf" _uuid="00000000-0000-0000-4EE1-AFB48AFF1AE8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fyfs.543h.6csf"><intent_id>1227739</intent_id><project_id>1009776</project_id><text_data>9887212</text_data><comment_date>2022-04-22T00:00:00</comment_date></row><row _id="row-evag.ih3i~uy7w" _uuid="00000000-0000-0000-0DAF-D15D3BA7E022" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-evag.ih3i~uy7w"><intent_id>471029</intent_id><project_id>666097</project_id><text_data>-- On 8/23/2011:--1.Provide a complete Johnson Controls Direct Digital Control (DDC) System including controls, wiring, conduit, software , engineering, programming, graphics, testing, commissioning support, training and warranty per specification sections 230993 �Sequence of Operation for HVAC Controls�, and plans dated 5/3/11. 2.Mechanical Retrofit3.Engineer HVAC controls system, supervise wiring and eivce installation, inspect installation and test system. 4.Electrical Subcontractor Tools: Drills, hand tools, laptops, crimpers, etc.Automated: Hand tools, multi-meter, computer based commission tools.</text_data><comment_date>2011-10-27T00:00:00</comment_date></row><row _id="row-chyi.3ywi-zzmi" _uuid="00000000-0000-0000-0206-E235387850E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-chyi.3ywi-zzmi"><intent_id>1202752</intent_id><project_id>993983</project_id><text_data>#1 - Describe the work that your firm was contracted to perform. Weatherization on low-income homes. #2 - Is the structure a single family dwelling, duplex, apartment, condominium, or other residential structure? single Family #3 - Including any basement or garage, how many stories or levels does the structure have?generally 1 level #4 - What is the building used for? Residential --Answer �yes� or �no� to each of the following options: (a) Any commercial use in the structure? no (b) Any retail use in the structure? no (c) Permanent residence only? yes (d) Rehabilitation house?no (e) Transitional housing? no (f) Communal dining facility? no (g) Treatment services? no (h) Assisted living services? no (I) Dormitories?no (j) Counseling? no (k) Is each room and/or bed in the structure rented separately?n/a (l) Other? n/a #5 - Does each dwelling unit have its own self-contained kitchen? yes #6 - Does each dwelling unit have its own bathroom? yes #7 - Is there a community facility or manager�s office on site? no #8 - Is any part of the structure used by members of the public? No</text_data><comment_date>2022-03-08T00:00:00</comment_date></row><row _id="row-szw9-nbsy-qjcq" _uuid="00000000-0000-0000-54B0-D25790A8DDD6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-szw9-nbsy-qjcq"><intent_id>739377</intent_id><project_id>781580</project_id><text_data>Sharon Smith is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height. The home is not open to the public and does not have a business. The electricians will be making electrical repairs. This job meets the residential job requirements.</text_data><comment_date>2015-12-29T00:00:00</comment_date></row><row _id="row-a5yn-ii64~dffj" _uuid="00000000-0000-0000-6934-139B10DCAFF4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a5yn-ii64~dffj"><intent_id>518960</intent_id><project_id>690232</project_id><text_data>General Laborer to assist foreman/operator on site with clean up.</text_data><comment_date>2012-06-26T00:00:00</comment_date></row><row _id="row-asif_vr8m~k7td" _uuid="00000000-0000-0000-D513-E2375E8CD4FC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-asif_vr8m~k7td"><intent_id>718291</intent_id><project_id>771374</project_id><text_data>Job # 8006052</text_data><comment_date>2015-09-01T00:00:00</comment_date></row><row _id="row-abnh_h3az_symz" _uuid="00000000-0000-0000-C9F8-A02151295283" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-abnh_h3az_symz"><intent_id>888516</intent_id><project_id>843348</project_id><text_data>Other truck is a water truck</text_data><comment_date>2018-02-15T00:00:00</comment_date></row><row _id="row-7m3k~mbn2.9ygx" _uuid="00000000-0000-0000-538F-FD0DCEA6C199" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-7m3k~mbn2.9ygx"><intent_id>1076113</intent_id><project_id>918821</project_id><text_data>Truck:  Model - GMC, Year - 2005, Model - C7500, Gross Weight - 26,000</text_data><comment_date>2020-07-29T00:00:00</comment_date></row><row _id="row-gck7_kugp.ff2m" _uuid="00000000-0000-0000-3CD4-01A450D04653" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gck7_kugp.ff2m"><intent_id>966299</intent_id><project_id>876105</project_id><text_data>Bldg. 170 - MUA #1 - HRGB400 Ducted Reznor Unit Rplcmt</text_data><comment_date>2019-03-20T00:00:00</comment_date></row><row _id="row-23hp_xxu7-59g2" _uuid="00000000-0000-0000-E5B2-4E0805471435" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-23hp_xxu7-59g2"><intent_id>865903</intent_id><project_id>827128</project_id><text_data>Types of Systems Worked on: Communications CablingArea Where Work Performed: Inside BuildingSpecific Nature of the Work: Build out Communications equipment room and install distribution cable for voice / data communications.  Install copper cables for communications backbone between equipment rooms.  Terminate cables in the equipment room and terminate the cables routed between Comm. equipment rooms.</text_data><comment_date>2017-09-28T00:00:00</comment_date></row><row _id="row-dtab~pxnu-iq2p" _uuid="00000000-0000-0000-EE44-679F76FC939C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dtab~pxnu-iq2p"><intent_id>687697</intent_id><project_id>759370</project_id><text_data>1)We were contracted to repair the furnace 2)Single family dwelling. 3)1, 4)Residential home, A)No, B)No, C)Yes, D)No, E)No, F)No, G)No, H)No, I)No, J)No, K)No, 5)No, 6)No, 7)No, 8)No.</text_data><comment_date>2015-04-07T00:00:00</comment_date></row><row _id="row-imip~964r_g37n" _uuid="00000000-0000-0000-DB86-C30DE64E45EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-imip~964r_g37n"><intent_id>600437</intent_id><project_id>664350</project_id><text_data>Filed by Karen Siler.</text_data><comment_date>2013-10-21T00:00:00</comment_date></row><row _id="row-tki4~ewjk.4akw" _uuid="00000000-0000-0000-4C3A-F8EE7687510A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tki4~ewjk.4akw"><intent_id>655968</intent_id><project_id>744280</project_id><text_data>Our contract includes installation of irrigation systems, seeding, topsoil, bark mulch, washed river rock, shrubs, trees and sod.</text_data><comment_date>2014-09-22T00:00:00</comment_date></row><row _id="row-cpbj_t9yi~msk9" _uuid="00000000-0000-0000-46C3-C7DECCE88DC8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cpbj_t9yi~msk9"><intent_id>1501734</intent_id><project_id>1165600</project_id><text_data>30012993</text_data><comment_date>2025-01-15T00:00:00</comment_date></row><row _id="row-f38h.hmp7.d8fa" _uuid="00000000-0000-0000-C801-3CDB93561665" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f38h.hmp7.d8fa"><intent_id>655762</intent_id><project_id>721042</project_id><text_data>Spectra Contract Flooring is Filing on Behalf of Bay View Flooring, LLC due to Ceased Operations.</text_data><comment_date>2014-09-19T00:00:00</comment_date></row><row _id="row-uzu5~bdca-nqg3" _uuid="00000000-0000-0000-4962-5E0FF586020A" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-uzu5~bdca-nqg3"><intent_id>1240619</intent_id><project_id>986365</project_id><text_data>Replacement of windows on single family houses#2 yes single family dwelling#3. 2 story max#4. single family dwellinga)nob)noc)yesd)noe)nof)nog)noh)noI)noJ)nok)nol)no#5. N/A#6.N/A#7. N/A#8 NO</text_data><comment_date>2022-06-30T00:00:00</comment_date></row><row _id="row-xk7x.kgva_ttfj" _uuid="00000000-0000-0000-9AB6-DC30462EC73C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xk7x.kgva_ttfj"><intent_id>738243</intent_id><project_id>767777</project_id><text_data>Labor Ready is a temporary labor service provider and is therefore exempt from the requirement to obtain a contractor&amp;#39;s license.</text_data><comment_date>2015-12-17T00:00:00</comment_date></row><row _id="row-g3nv_uy2t-c7k5" _uuid="00000000-0000-0000-AD16-5F180258BAA1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-g3nv_uy2t-c7k5"><intent_id>914688</intent_id><project_id>854663</project_id><text_data>Other Truck - Equipment Haul using a Kenworth 6x4 Bogie Axle 56,000 GVW Diesel</text_data><comment_date>2018-06-28T00:00:00</comment_date></row><row _id="row-mbnw.8t36~fdfk" _uuid="00000000-0000-0000-AF69-A276F96D5776" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mbnw.8t36~fdfk"><intent_id>521299</intent_id><project_id>691244</project_id><text_data>Preparing subgrade</text_data><comment_date>2012-07-10T00:00:00</comment_date></row><row _id="row-x2hw-smbq~um2y" _uuid="00000000-0000-0000-B31F-D72CCD78697B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x2hw-smbq~um2y"><intent_id>730740</intent_id><project_id>776418</project_id><text_data>Job # 8007969</text_data><comment_date>2015-11-09T00:00:00</comment_date></row><row _id="row-cqvg-vcy8-hd7b" _uuid="00000000-0000-0000-594D-9F6CB0C8CA7B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-cqvg-vcy8-hd7b"><intent_id>680960</intent_id><project_id>756452</project_id><text_data>Provide labor and materials for wireless bridge between REEBS and BHS</text_data><comment_date>2015-02-26T00:00:00</comment_date></row><row _id="row-putu.j9pg-376r" _uuid="00000000-0000-0000-6276-DF8BDF3E07E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-putu.j9pg-376r"><intent_id>683740</intent_id><project_id>720521</project_id><text_data>Wage:44.36; Individual Account Pension: 2.00; Pension; 5.51; Occupational Health: .12; Health &amp; Welfare: 8.44Apprenticeship: .50; Industry Fund: .10; LMCT: .05</text_data><comment_date>2015-03-14T00:00:00</comment_date></row><row _id="row-s2ga.vcyc_yffs" _uuid="00000000-0000-0000-FFE5-58F2F48961D5" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-s2ga.vcyc_yffs"><intent_id>1278777</intent_id><project_id>1037591</project_id><text_data>9903550</text_data><comment_date>2022-10-29T00:00:00</comment_date></row><row _id="row-ayek.dcks-merr" _uuid="00000000-0000-0000-FA50-E15F12FAADBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ayek.dcks-merr"><intent_id>594095</intent_id><project_id>720137</project_id><text_data>The other truck is a KW Tractor w/lowboy hauling equipment and materials to the jobsite. The fringe benefits consist of $8.43 Pension and $5.74 H&amp;W.</text_data><comment_date>2013-09-17T00:00:00</comment_date></row><row _id="row-u9dx~wq8w.juaq" _uuid="00000000-0000-0000-2FB9-D00F03D7B633" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-u9dx~wq8w.juaq"><intent_id>1002414</intent_id><project_id>882676</project_id><text_data>We are a Tribal-Owned Company whose insurance meets and/or exceeds L&amp;I Workers Comp.</text_data><comment_date>2019-08-26T00:00:00</comment_date></row><row _id="row-pdkd_sspu~ucqm" _uuid="00000000-0000-0000-1015-C3165DB4B54E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pdkd_sspu~ucqm"><intent_id>896779</intent_id><project_id>847539</project_id><text_data>SV32462</text_data><comment_date>2018-04-04T00:00:00</comment_date></row><row _id="row-98ay~v6q4_w9kq" _uuid="00000000-0000-0000-2A87-200687BED3C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-98ay~v6q4_w9kq"><intent_id>840541</intent_id><project_id>819205</project_id><text_data>Scope of work includes brick pavers, landscaping,  planting, irrigation systems, topsoil installation &amp;lt; 6&amp;quot; in depth,</text_data><comment_date>2017-06-14T00:00:00</comment_date></row><row _id="row-wer8.6hm9.4tvf" _uuid="00000000-0000-0000-5F45-13AE886F32F4" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wer8.6hm9.4tvf"><intent_id>699934</intent_id><project_id>742172</project_id><text_data>Form filed by:  Amber Hart</text_data><comment_date>2015-06-11T00:00:00</comment_date></row><row _id="row-irz9-pu92~rpic" _uuid="00000000-0000-0000-C5CD-FF134100FCB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-irz9-pu92~rpic"><intent_id>733926</intent_id><project_id>777973</project_id><text_data>For heat pump repairs/ OES/LIHEAP program</text_data><comment_date>2015-12-03T00:00:00</comment_date></row><row _id="row-3fiw-6hzh~fagh" _uuid="00000000-0000-0000-458E-C04C42ACF97C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3fiw-6hzh~fagh"><intent_id>559293</intent_id><project_id>704332</project_id><text_data>Form filed by: Grisdela Gonzales</text_data><comment_date>2013-03-08T00:00:00</comment_date></row><row _id="row-ijn7~zzbr.s8dw" _uuid="00000000-0000-0000-6E9C-5A1FCFCB634D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijn7~zzbr.s8dw"><intent_id>1080739</intent_id><project_id>929281</project_id><text_data>Irrigation Repairs/Replacements to entire site:�	    Replacement of (4) RB 1804.�	Replacement of (2) RB 1806.�	Replacement of (8) RB 1804 SAM.�	Replacement of (5) RB 1806 SAM.�	Replacement of (26) MPR Nozzles.�	Replacement of (20) 1/5' Marlex 90.�	Replacement of (1) 1' Slip Fix.�	Replacement of (1) 1' Coup (S).�	Replacement of (4) 3/4' Slip Fix.�	Replacement of (4) 3/4' Coup (S).</text_data><comment_date>2020-08-17T00:00:00</comment_date></row><row _id="row-mdz8_wfg3-4anx" _uuid="00000000-0000-0000-19F4-13F9BF8BD66B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mdz8_wfg3-4anx"><intent_id>1086314</intent_id><project_id>931863</project_id><text_data>This is a project that has been replanted with native trees and shrubs and now requires maintenance to assure their survival. The tasks are all hand labor.Specific tasks:maintenance brush control using the application of herbicides directly to competing invasive plants, using a hand held wand attached to a small backpack tank, under the direct supervision of a licensed applicator.tube qc: tube quality control: walk through previously planted areas and adjust tree protectors and the stakes they�re attached to so they will continue to protect the young trees.maintenance brush control, using weed trimmers and/or walk behind mowers</text_data><comment_date>2020-09-08T00:00:00</comment_date></row><row _id="row-69n2.ggm3~t28w" _uuid="00000000-0000-0000-F830-03C1CD1D2BBE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-69n2.ggm3~t28w"><intent_id>695691</intent_id><project_id>762768</project_id><text_data>GENERAL LABORERS USE HAND TOOLS SUCH AS SHOVELS AND RAKE AND DO MANUAL TASKS SUCH AS INSTALLING SILT FENCE AND HAY. OTHER TRUCKS INCLUDE LOWBOY AND/OR WATERTRUCKS.</text_data><comment_date>2015-05-20T00:00:00</comment_date></row><row _id="row-gj4j~rju8~x4vc" _uuid="00000000-0000-0000-A6A4-07D2B04F6AFF" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gj4j~rju8~x4vc"><intent_id>814859</intent_id><project_id>812955</project_id><text_data>Job Order Contract (JOC)  Construction Services for Capital ProjectsContract No. RTA/CN 0165-15Work Order No.  002 - CCE 73490-0002</text_data><comment_date>2017-02-07T00:00:00</comment_date></row><row _id="row-gz7g_fnjr_hbyh" _uuid="00000000-0000-0000-9771-E5A429AD0652" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gz7g_fnjr_hbyh"><intent_id>587588</intent_id><project_id>717730</project_id><text_data>Form Filed By: Maureen Cwalina</text_data><comment_date>2013-08-14T00:00:00</comment_date></row><row _id="row-fcwd_5kp7.p2t9" _uuid="00000000-0000-0000-3944-5F12B7D878E1" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fcwd_5kp7.p2t9"><intent_id>1155806</intent_id><project_id>968367</project_id><text_data>#1 � The crew will be repairing the flooring and installing a new door passage set and securing the access panel.#2 - Singe-Family #3 � 1 Story #4 - (a) No (b) No (c) Yes (d) No (e) No (f) No (g) No (h) No (i) No (j) No (k) No (l) No #5 � Yes#6 - Yes #7 - No #8 - No</text_data><comment_date>2021-06-25T00:00:00</comment_date></row><row _id="row-5mrd~stbq.hkwe" _uuid="00000000-0000-0000-E35F-99924E1DA7A9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5mrd~stbq.hkwe"><intent_id>595704</intent_id><project_id>720683</project_id><text_data>GM JOB# 13723</text_data><comment_date>2013-09-24T00:00:00</comment_date></row><row _id="row-5cs5~4edh_fcq9" _uuid="00000000-0000-0000-1CB7-3CCC4F988D62" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5cs5~4edh_fcq9"><intent_id>1179617</intent_id><project_id>980391</project_id><text_data>Tear down and return 24x60 mobile office building using 2007 International Toter</text_data><comment_date>2021-09-22T00:00:00</comment_date></row><row _id="row-xmhm~eiqn.959q" _uuid="00000000-0000-0000-2D38-70E5E8CFB2BA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xmhm~eiqn.959q"><intent_id>496980</intent_id><project_id>678119</project_id><text_data>Request to add the following statement per Kim: &amp;quot;Project is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101.Workers will be paid in accordance with Davis-Bacon wage requirements for the following crafts/trades/occupations.&amp;quot;-murq235</text_data><comment_date>2012-03-06T00:00:00</comment_date></row><row _id="row-a4tb_jbv8~ugcu" _uuid="00000000-0000-0000-6A2D-191860FAE229" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-a4tb_jbv8~ugcu"><intent_id>818111</intent_id><project_id>809415</project_id><text_data>Signed by Cheri Fiorucci</text_data><comment_date>2017-02-28T00:00:00</comment_date></row><row _id="row-8xhn_j86x.v2kz" _uuid="00000000-0000-0000-60FE-B5DF7C66C62C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-8xhn_j86x.v2kz"><intent_id>1089932</intent_id><project_id>933503</project_id><text_data>Repair broken drip valve to the irrigation system</text_data><comment_date>2020-09-22T00:00:00</comment_date></row><row _id="row-fqvy_qicr_322b" _uuid="00000000-0000-0000-0431-565CF3B418C6" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fqvy_qicr_322b"><intent_id>710458</intent_id><project_id>741211</project_id><text_data>Davis-Bacon exemption</text_data><comment_date>2015-09-18T00:00:00</comment_date></row><row _id="row-jy29.934z-8cn3" _uuid="00000000-0000-0000-131F-AD21381EFF60" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jy29.934z-8cn3"><intent_id>752759</intent_id><project_id>783160</project_id><text_data>Filed by Martin Colorado</text_data><comment_date>2016-03-22T00:00:00</comment_date></row><row _id="row-bsna.ad9d~pcnu" _uuid="00000000-0000-0000-BC7B-5036457997D7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-bsna.ad9d~pcnu"><intent_id>783221</intent_id><project_id>786082</project_id><text_data>SMS-Superior Maint Sltns LLC is filing on behalf of Pro Chavez Landscaping &amp; Construction LLC due to failure to file.</text_data><comment_date>2016-08-18T00:00:00</comment_date></row><row _id="row-2bke.yezk_cpj8" _uuid="00000000-0000-0000-480D-48C10810F526" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2bke.yezk_cpj8"><intent_id>1087020</intent_id><project_id>925616</project_id><text_data>Other Trucks will consist of a LowBoy tractor and trailer for mobilization of equipment to and from the site</text_data><comment_date>2020-09-15T00:00:00</comment_date></row><row _id="row-n6qc_4hgd~kzur" _uuid="00000000-0000-0000-9DD9-8B9C1406ACA7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n6qc_4hgd~kzur"><intent_id>675833</intent_id><project_id>704635</project_id><text_data>Hydroseeding for bearutification perposes only  this project is for BP 121</text_data><comment_date>2015-01-22T00:00:00</comment_date></row><row _id="row-27ey_u9ay-9i2a" _uuid="00000000-0000-0000-F6A6-5253501D5365" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-27ey_u9ay-9i2a"><intent_id>658965</intent_id><project_id>746072</project_id><text_data>Scope of work includes: Prepare planting area by  hand pruning &amp;/or removing existing scrub/brush, and old stumps; purchase, hand dig planting holes to depth of 14 inches maximum; provide and plant new plant material; spread new topsoil to depth of 4 inches average; hand spread new mulch materials to depth of 2 inches average.Tools to be used on job hand :pruners, loppers, hand pruning saws, shovels, rakes, picks, wheelbarrows.</text_data><comment_date>2014-10-07T00:00:00</comment_date></row><row _id="row-ikr4_gwza.t8nw" _uuid="00000000-0000-0000-21F2-512C14ECBFC3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ikr4_gwza.t8nw"><intent_id>453280</intent_id><project_id>665041</project_id><text_data>This particular bid, only involved my company.  The scope of work was removing sod and moving sprinklers.  As owner/operator I utilized and operated my mini-bobcat to cut the sod and my hired help rolled up the sod and discarded.  The moving of sprinklers involved shovels and I used the existing sprinklers, I positioned them for more and adequate coverage.  We layed concrete sidewalks per city specifications.  This involved set up form board with hammer and stakes.  The wood did not require cutting.  Layed new sod, minmimal, this only required my hired help to lay the sod.  As owner/operator if there was any cutting required, which was minimal I performed this task.</text_data><comment_date>2011-05-26T00:00:00</comment_date></row><row _id="row-tuin-j9pi.9ttm" _uuid="00000000-0000-0000-1BA7-246744601029" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-tuin-j9pi.9ttm"><intent_id>1095060</intent_id><project_id>935882</project_id><text_data>Motor Pat Grader to vacuum any contaminated liquids from roadwayHaz Waste Workers to clear area of all debris using shovel/rake/brooms</text_data><comment_date>2020-10-12T00:00:00</comment_date></row><row _id="row-p7bf~ydcw.my3m" _uuid="00000000-0000-0000-9ACF-A0A3AAF258E0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7bf~ydcw.my3m"><intent_id>452304</intent_id><project_id>664635</project_id><text_data>WISTERIA BUILDING A, B C &amp; D</text_data><comment_date>2011-04-21T00:00:00</comment_date></row><row _id="row-94y6_mvxb_zd95" _uuid="00000000-0000-0000-DD2B-EF05EC2C5C21" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-94y6_mvxb_zd95"><intent_id>1011506</intent_id><project_id>894986</project_id><text_data>Epic Elec - hired sub labor</text_data><comment_date>2019-10-02T00:00:00</comment_date></row><row _id="row-jb3p-3y4y.7pg3" _uuid="00000000-0000-0000-2A02-9ED31EEE38EA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jb3p-3y4y.7pg3"><intent_id>872078</intent_id><project_id>836303</project_id><text_data>1) Leak under bathroom. 2) Yes. 3) One. 4a) No. 4b) No. 4c) Yes. 4d) No. 4e) No. 4f) No. 4g) No. 4h) No. 4i) No. 4j) No. 4k) No. 5) Yes. 6) Yes. 7) Yes - manager office. 8) No.</text_data><comment_date>2017-10-30T00:00:00</comment_date></row><row _id="row-2k6j.u8hy-icj8" _uuid="00000000-0000-0000-A90A-4C865A2DEC69" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-2k6j.u8hy-icj8"><intent_id>755599</intent_id><project_id>789156</project_id><text_data>#1 Make spot repair to storm drain#2 Apartment#3 3 levels#4 a. No b. No c. Yes d. No e. No f. No g. No h. No i. No j.No k No#5. Yes#6. Yes#7 Yes#8 No</text_data><comment_date>2016-04-08T00:00:00</comment_date></row><row _id="row-fa3m.666r-auek" _uuid="00000000-0000-0000-9376-2213D19CBBAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fa3m.666r-auek"><intent_id>947004</intent_id><project_id>867017</project_id><text_data>Time and Materials Job</text_data><comment_date>2018-11-20T00:00:00</comment_date></row><row _id="row-fwzw_bh5r~gkhx" _uuid="00000000-0000-0000-FC71-FB05B6193D20" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-fwzw_bh5r~gkhx"><intent_id>985670</intent_id><project_id>835586</project_id><text_data>FILED BY RITA NIELSEN1.	Holroyd Co., Inc does not concede that its concrete delivery drivers are properly covered by the prevailing wage statutes &amp; regulations in Washington; and2.	Holroyd Co., Inc. does not agree that the prevailing wage rates set forth by the Dept of Labor &amp; Industries for Concrete Mixer &amp; Dump Trucks are correct.</text_data><comment_date>2019-06-18T00:00:00</comment_date></row><row _id="row-ff4q_y85c~92cp" _uuid="00000000-0000-0000-1B3B-5B6D31936AD9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ff4q_y85c~92cp"><intent_id>736890</intent_id><project_id>771120</project_id><text_data>095155</text_data><comment_date>2015-12-09T00:00:00</comment_date></row><row _id="row-3gbc~wqf4~wvnp" _uuid="00000000-0000-0000-63F4-CFB618764B14" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-3gbc~wqf4~wvnp"><intent_id>790060</intent_id><project_id>802748</project_id><text_data>Blanket Contract covering 9.16.16 through 9.15.17 with options to renew up to 10 years (2026).Will mostly use Plumber Pipefitter rate for most work with this contract as it is work on the fuel systems.Listed Laborer and Operator in case special circumstances arise that Plumbing work is not performed or additional workers are needed for a project.</text_data><comment_date>2016-09-19T00:00:00</comment_date></row><row _id="row-pd6k-k8iu_iehv" _uuid="00000000-0000-0000-A70C-0C9AC27B27EE" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-pd6k-k8iu_iehv"><intent_id>782661</intent_id><project_id>799874</project_id><text_data>LONG Job# 5050.160262</text_data><comment_date>2016-08-16T00:00:00</comment_date></row><row _id="row-r65d.zbkn_agfx" _uuid="00000000-0000-0000-9C5E-636255E9BAB2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r65d.zbkn_agfx"><intent_id>1193653</intent_id><project_id>988240</project_id><text_data>26,000 lb Straight Truck</text_data><comment_date>2021-11-16T00:00:00</comment_date></row><row _id="row-4ftm.fae9.ahc5" _uuid="00000000-0000-0000-3489-FD1130D94C67" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4ftm.fae9.ahc5"><intent_id>535555</intent_id><project_id>689960</project_id><text_data>this intent replaces #532761, #532764 &amp; #532766</text_data><comment_date>2012-09-20T00:00:00</comment_date></row><row _id="row-xiaq_h4uh-kxpi" _uuid="00000000-0000-0000-CA1A-3D85F6841FBB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-xiaq_h4uh-kxpi"><intent_id>712548</intent_id><project_id>769240</project_id><text_data>Russell Landscaping is responsible for installing a drain line for phase 3b at Eisenhower High School.  Drain line was installed along perimeter of outfield.  This included a catch basin, drain rock, weed barrier and pipe.  A mini excavator, shovels and rakes will be used to complete this project.</text_data><comment_date>2015-08-06T00:00:00</comment_date></row><row _id="row-gpv3.5i2v.s2h2" _uuid="00000000-0000-0000-B85C-721D1C9B32DC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gpv3.5i2v.s2h2"><intent_id>1152263</intent_id><project_id>966517</project_id><text_data>0621025</text_data><comment_date>2021-06-14T00:00:00</comment_date></row><row _id="row-p7re~vtnn~gijw" _uuid="00000000-0000-0000-5A23-7ABB9291B3BC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-p7re~vtnn~gijw"><intent_id>1281038</intent_id><project_id>1039304</project_id><text_data>9897073</text_data><comment_date>2022-11-03T00:00:00</comment_date></row><row _id="row-ebrb-sype.a7c9" _uuid="00000000-0000-0000-EE03-D620A3B324B0" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ebrb-sype.a7c9"><intent_id>1178752</intent_id><project_id>979933</project_id><text_data>Project# 03346, Biotti, Warner, 11612 N Sheridan St, Lot E17, Mead, WA 99021</text_data><comment_date>2021-09-20T00:00:00</comment_date></row><row _id="row-syt4_hfeq-pwjg" _uuid="00000000-0000-0000-D7B8-85A06EADCFAA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-syt4_hfeq-pwjg"><intent_id>887505</intent_id><project_id>843335</project_id><text_data>Finge amount is an average amount for the employees we plan on using on the job site.  Employee specific amounts will be deducted on our payroll and reflected in our payroll reports.</text_data><comment_date>2018-02-09T00:00:00</comment_date></row><row _id="row-vzum-4wy7.4ae2" _uuid="00000000-0000-0000-1E2E-61C3A9A94D0C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vzum-4wy7.4ae2"><intent_id>577057</intent_id><project_id>713975</project_id><text_data>Filed by: Jon Peters</text_data><comment_date>2013-06-24T00:00:00</comment_date></row><row _id="row-52zy_24tk~s9mm" _uuid="00000000-0000-0000-33A0-FF0E00CDEBA2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-52zy_24tk~s9mm"><intent_id>860334</intent_id><project_id>831663</project_id><text_data>1.-Plumbing services. 2-Apartment 3-2, 4-3, 5-a-yes b-no, c-yes, d-no e-no, f-no, g-no, h-no, i-no, j-no, k-no, l-apt yes, 5-yes, 6-yes, 7-yes, 8-no</text_data><comment_date>2017-09-01T00:00:00</comment_date></row><row _id="row-qmv4_t928.yqjb" _uuid="00000000-0000-0000-957D-F0E4584C44D9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qmv4_t928.yqjb"><intent_id>1203168</intent_id><project_id>992207</project_id><text_data>Breakdown #1 $13.70 Pension. $2.74 Medical. $2.74 Vacation. $2.16 Holiday. $1.80 Paid LeaveBreakdown #2 $10.34 Pension. $6.14 Medical. $2.74 Vacation. $2.16 Holiday. $1.80 Paid Leave</text_data><comment_date>2022-02-07T00:00:00</comment_date></row><row _id="row-ycjv.fu4u_7wzf" _uuid="00000000-0000-0000-1E2F-D90182FCA1BB" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ycjv.fu4u_7wzf"><intent_id>778326</intent_id><project_id>795727</project_id><text_data>Taylor Transport Inc. 401K Pension plan is 100% immediately vested and paid weekly</text_data><comment_date>2016-07-28T00:00:00</comment_date></row><row _id="row-qtay~84bn_k6mg" _uuid="00000000-0000-0000-52DA-B5CC9B4D0ACC" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qtay~84bn_k6mg"><intent_id>894229</intent_id><project_id>819746</project_id><text_data>Install refrigerant piping and refrigerant lines and valves</text_data><comment_date>2018-03-22T00:00:00</comment_date></row><row _id="row-9n4u_vr3m~79vz" _uuid="00000000-0000-0000-82C0-638F9F20B36C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9n4u_vr3m~79vz"><intent_id>893989</intent_id><project_id>806741</project_id><text_data>This Intent replaces ID #824296 on which we stated that employees would not be performing work.</text_data><comment_date>2018-03-21T00:00:00</comment_date></row><row _id="row-k68e_d9nm~2nsr" _uuid="00000000-0000-0000-B146-7633E1A06D46" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-k68e_d9nm~2nsr"><intent_id>927026</intent_id><project_id>859239</project_id><text_data>8/1/18 11:46Called out for plugged kitchen sink on 2nd floor, this is their only drain line. Andy showed where clean-out was in wall on 1st floor with a screw in the middle, removed screw and water started to come out, line was holding water. Ran 3/8 inch cable through pulled p-trap in 2nd floor several times, each time worked further down line and cable kept coming back extremely sludgy. After several attempts line cleared line at approximately 75 feet, was hard to retrieve cable from line. Went back down to clean-out an found it was cleared of water. Ran mini camera down clean-out but could only get 12 feet down line. Attempted again with 3/8 inch cable from clean-out on first floor but cable would only get out approximately 13 feet and camera still stops at 12 feet. Line looks clear but unable to run camera or cable any further. Attempted several times and was able to push it 30 feet once, ran camera and found cable had moved a large obstruction that takes up a majority of pipe and it was rattling around in line. Tried with blades and pushed object from 12 feet to 15 feet and is now right at a turn. Recorded video of line to review with manager to see where to go from here.8/8/18 1:50-5:00Cabled from clean-out on stack approximately 17 feet to object that was stuck in the line where last technician located under the edge of a counter. Managed to push object out with 3/8 inch cable approximately 12 feet. Object is still a good distance from 3 inch main line piping however was told since it&amp;#39;s moving to keep cabling, will return tomorrow.8/9/18 8:20-4:00Returned with a brand new 3/8 inch cable. Ran cable from same spot as yesterday, managed to work object in pipe out over 25 more feet. Got a small amount of water to flow from upstairs break room sink. Could see that object was an approximately 2 inch round rock, was extremely hard to push rock into 4 inch piping. Found a small belly/void at the 2 x 4 inch connection, the rock along with other small pieces of concrete was sitting in void and not moving. There is good water flow when flushing upstairs break room sink. Camera&amp;#39;d about another 20 feet to where line ties into another 4 inch line, could not locate this area due to rooms being locked.  Showed maintenance where 2 x 4 inch connection is in hallway, where rock pushed out and video of line when done. Believe this rock entered the line through a roof vent, worked its way down vent and eventually the piping into the drain line.</text_data><comment_date>2018-08-20T00:00:00</comment_date></row><row _id="row-ijgz.b2qf~mhxt" _uuid="00000000-0000-0000-F579-6F27C2CF7A27" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-ijgz.b2qf~mhxt"><intent_id>1268306</intent_id><project_id>1031948</project_id><text_data>9897864</text_data><comment_date>2022-09-21T00:00:00</comment_date></row><row _id="row-74pw_8dcw-u26x" _uuid="00000000-0000-0000-E179-DD64930E880B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-74pw_8dcw-u26x"><intent_id>943067</intent_id><project_id>855425</project_id><text_data>0918131</text_data><comment_date>2018-10-31T00:00:00</comment_date></row><row _id="row-32i3~idcr~9ipd" _uuid="00000000-0000-0000-DFE8-3D7B139FFE43" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-32i3~idcr~9ipd"><intent_id>1009210</intent_id><project_id>894052</project_id><text_data>Change in company name. Previously Atwork! 600-257-759 ATWOR**994LM. Same contract, re-filing due to change in company info. Fringe Benefit break down:  Medical 3.06, Vacation .85 totaling 3.91</text_data><comment_date>2019-09-23T00:00:00</comment_date></row><row _id="row-issb_6a2e~s3ac" _uuid="00000000-0000-0000-130C-FE788DBEBB3D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-issb_6a2e~s3ac"><intent_id>1252381</intent_id><project_id>1023599</project_id><text_data>122854-001</text_data><comment_date>2022-07-26T00:00:00</comment_date></row><row _id="row-c2dw.36vm.c8yr" _uuid="00000000-0000-0000-EBB8-80D973407D2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-c2dw.36vm.c8yr"><intent_id>1240129</intent_id><project_id>990605</project_id><text_data>details for the fringe benefit:     Health &amp; Welfare   $          10.05    Harrison Supplemental Flexible Benefit Fund   $            1.30    9th District Pension   $            1.65    Edison Pension   $            6.63    National Electrical Benefit Fund   $            1.07    Apprenticeship/Training   $            0.75    Barnes Allison Local Labor-Management Cooperation Committee   $            0.20    Vacation Fund   $            1.42    Working Dues   $            0.62    Apprentice Working Dues   $            0.26    Political Action Committee Fund   $            0.05    Admin Fund   $            0.18    National Electrical Contactors Association    $            0.27</text_data><comment_date>2022-06-29T00:00:00</comment_date></row><row _id="row-x367_zwar.fgmx" _uuid="00000000-0000-0000-A712-779DC4C98C01" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-x367_zwar.fgmx"><intent_id>1280553</intent_id><project_id>1039031</project_id><text_data>0422181</text_data><comment_date>2022-11-02T00:00:00</comment_date></row><row _id="row-5gpc-pyjy~hfrr" _uuid="00000000-0000-0000-8CD8-F801F5D226C9" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5gpc-pyjy~hfrr"><intent_id>838253</intent_id><project_id>823456</project_id><text_data>Robert Danner is a single family home, the home has a kitchen and at least one bathroom and is considered a permanent primary residence for its tenants. The home is no more than two stories in height and does not have a business nor is it open to the public. The crew will be installing a new ductless heat pump, new bathroom fans, new smoke alarms and repairing insulation. This job meets the residential job requirements.</text_data><comment_date>2017-06-05T00:00:00</comment_date></row><row _id="row-dkd4~5rmf_jvtt" _uuid="00000000-0000-0000-3E36-FE46EEC5C3D3" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-dkd4~5rmf_jvtt"><intent_id>1040200</intent_id><project_id>909419</project_id><text_data>1.  Repair plumbing in main bathroom2. Single Family3.34. a- no, b-no, c-yes, d-no, e-no, f-no, g-no, h-no, i-no, j-no5. yes6. yes7. no8. no</text_data><comment_date>2020-02-21T00:00:00</comment_date></row><row _id="row-9mgt-f5vh-8de5" _uuid="00000000-0000-0000-E1F0-E1EFAE5E9889" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-9mgt-f5vh-8de5"><intent_id>1164787</intent_id><project_id>958452</project_id><text_data>Stoneway Concrete is a Supplier</text_data><comment_date>2021-07-29T00:00:00</comment_date></row><row _id="row-5e36~6ish-42hn" _uuid="00000000-0000-0000-433B-5B5097675E4B" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5e36~6ish-42hn"><intent_id>895128</intent_id><project_id>835986</project_id><text_data>1 - Repair shower drain leak 2 - single family 3 - one story 4 - home a - no b - no c - yes d - no e - no f - no g - no h - no i - no j - no k - no l - no  5 - yes 6 - yes 7 no 8 - no</text_data><comment_date>2018-03-27T00:00:00</comment_date></row><row _id="row-nvsz~n9qr-sp2x" _uuid="00000000-0000-0000-9565-0839B2916F34" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nvsz~n9qr-sp2x"><intent_id>703365</intent_id><project_id>764743</project_id><text_data>Fringe Pay Includes :  $7.28 NW Sheet Metal Workers Pension, $4.24 National Pension, $10.98 NW Health Plan, $ .17 International Training Institute, $ 1.15 Apprenticeship Fund, $.65 Industry Fund, $1.00 Organizational Trust Fund, $.79 NW Supplemental Plan, and $.02 Clean Card.</text_data><comment_date>2015-06-25T00:00:00</comment_date></row><row _id="row-n4p7.4r9r.qdj3" _uuid="00000000-0000-0000-85AF-FBA944E84B16" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-n4p7.4r9r.qdj3"><intent_id>713242</intent_id><project_id>769510</project_id><text_data>Job # 103752-001</text_data><comment_date>2015-08-10T00:00:00</comment_date></row><row _id="row-mrda.44xn-8437" _uuid="00000000-0000-0000-E198-68909A1A6ECD" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-mrda.44xn-8437"><intent_id>954483</intent_id><project_id>870437</project_id><text_data>COMPLETED ORIGINAL WORK AND THEN HAD TO GO BACK TO JOBSITE TO CORRECT WATER ISSUE</text_data><comment_date>2019-01-10T00:00:00</comment_date></row><row _id="row-nip3-8cii.t2c2" _uuid="00000000-0000-0000-6C3A-0DA3AB2D403C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nip3-8cii.t2c2"><intent_id>888686</intent_id><project_id>843916</project_id><text_data>Inv #O2699577</text_data><comment_date>2018-02-16T00:00:00</comment_date></row><row _id="row-yjma-th6u-mkuj" _uuid="00000000-0000-0000-1432-FFD7B73F0177" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-yjma-th6u-mkuj"><intent_id>717251</intent_id><project_id>763950</project_id><text_data>We are a staffing company. The Telecommunication Technicians will pull computer data/internet cable from the IDF tothe station ends inside the building.</text_data><comment_date>2015-08-27T00:00:00</comment_date></row><row _id="row-nnwf~saj6~bw4d" _uuid="00000000-0000-0000-C08F-68FAFF369D7D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-nnwf~saj6~bw4d"><intent_id>798364</intent_id><project_id>805897</project_id><text_data>General Labor Work consists of hand work (shovel work) no power equipment or power tools. Other trucks consist of one 0-8,000 gallon water truck used during the grading process to help with compaction.</text_data><comment_date>2016-10-27T00:00:00</comment_date></row><row _id="row-iid9~e93r.nhxb" _uuid="00000000-0000-0000-01EC-CD56750B7E2C" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-iid9~e93r.nhxb"><intent_id>1221793</intent_id><project_id>1006110</project_id><text_data>Small works project</text_data><comment_date>2022-03-30T00:00:00</comment_date></row><row _id="row-4xk8~w4va-8uah" _uuid="00000000-0000-0000-6517-949E93F4C48E" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-4xk8~w4va-8uah"><intent_id>658043</intent_id><project_id>738073</project_id><text_data>Truck Drivers � Other Trucks are pick up street sweepers used to sweep construction activity. This is our street sweeper equipment list:2007 Schwarze A4000 Street Sweeper 2005 Sterling A7000 Street Sweeper 2006 Sterling A7000 Street Sweeper</text_data><comment_date>2014-10-01T00:00:00</comment_date></row><row _id="row-d9a4-5xpa.5sz5" _uuid="00000000-0000-0000-67BF-BC13200D3677" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-d9a4-5xpa.5sz5"><intent_id>500949</intent_id><project_id>682965</project_id><text_data>3113477</text_data><comment_date>2012-02-17T00:00:00</comment_date></row><row _id="row-6d8b_brwk-f39k" _uuid="00000000-0000-0000-7061-4297A28A74D8" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-6d8b_brwk-f39k"><intent_id>810335</intent_id><project_id>776690</project_id><text_data>This project was worked in 2016 under this account. Intent needs to be completed and then AWP will follow. Working on closing all AWP&amp;#39;s due to ownership change.Please call me if you have any further questions. -Mindy Hearring 253-531-9782</text_data><comment_date>2017-01-13T00:00:00</comment_date></row><row _id="row-qc6h.v98d.vrhc" _uuid="00000000-0000-0000-CBBE-D684C6184164" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-qc6h.v98d.vrhc"><intent_id>540433</intent_id><project_id>697499</project_id><text_data>Filed by Michael Miller</text_data><comment_date>2012-10-17T00:00:00</comment_date></row><row _id="row-wa9w.q365-qwu7" _uuid="00000000-0000-0000-8ABA-A68AF5E70914" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-wa9w.q365-qwu7"><intent_id>728810</intent_id><project_id>775609</project_id><text_data>Add aprox. 2 inches of topsoil to make  low areas around curb level with sidewalk and spread grass seed. Using only hand tools, shovels, rakes, hand held seed spreader.</text_data><comment_date>2015-10-28T00:00:00</comment_date></row><row _id="row-r6ix.8dvj_cyr2" _uuid="00000000-0000-0000-40A5-8238636BB868" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r6ix.8dvj_cyr2"><intent_id>769705</intent_id><project_id>795002</project_id><text_data>Other Trucks- Lowboy and Water Truck</text_data><comment_date>2016-06-21T00:00:00</comment_date></row><row _id="row-r65h-a3ym_agfh" _uuid="00000000-0000-0000-56B0-D312646D26E2" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-r65h-a3ym_agfh"><intent_id>710353</intent_id><project_id>765776</project_id><text_data>Filed by Kyndra BraunProject is exempt from state prevailing wage requirements based on the Housing Act of 1937 and 24 CFR 965.101. Workers will be paid in accordance with Davis-Bacon wage requirements.</text_data><comment_date>2015-07-28T00:00:00</comment_date></row><row _id="row-f6w5_nn3m-fs7w" _uuid="00000000-0000-0000-CF76-2D5BD69C9778" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-f6w5_nn3m-fs7w"><intent_id>1286059</intent_id><project_id>1042390</project_id><text_data>VE # 16857</text_data><comment_date>2022-11-28T00:00:00</comment_date></row><row _id="row-gsn2_s6rq~2i8g" _uuid="00000000-0000-0000-FA75-D5C63706DEB7" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-gsn2_s6rq~2i8g"><intent_id>889664</intent_id><project_id>844353</project_id><text_data>Work performed by the Telecommunication Technicians is installing telecommunications cabling Category 6 for data (computer networking ) indoors.  Physical address:  7401 144th Pl SE, Snohomish, WA 98296</text_data><comment_date>2018-02-22T00:00:00</comment_date></row><row _id="row-jpug-bm2a-p26b" _uuid="00000000-0000-0000-DDDD-D9F588644287" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-jpug-bm2a-p26b"><intent_id>1275379</intent_id><project_id>1035792</project_id><text_data>8/25/2022 Technician arrived on site to assess and make repairs on compactor. Customer explained issue with the tipper; elbow pin is seized and requires a forklift to move it. Technician inspected and measured the elbow pin. Sprayed PB Blaster penetrating oil on the pin and attempted to move it. Technician was not able to move the pin. Technician recommends removing and replacing the current pin with one that is removable and/or a grease-able version. Customer suggests using a shoulder bolt and removable cap on one side of the pin so it can be removed. Also possibly use a turn down elbow locking pin to make it easier to remove.SWS Equipment to follow up with customer.</text_data><comment_date>2022-10-17T00:00:00</comment_date></row><row _id="row-5fnb.8rgx.tdpq" _uuid="00000000-0000-0000-565A-090D67BC3EBA" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-5fnb.8rgx.tdpq"><intent_id>1222614</intent_id><project_id>1006616</project_id><text_data>HM WO 10721</text_data><comment_date>2022-04-01T00:00:00</comment_date></row><row _id="row-vfiw_wnzz~b6fi" _uuid="00000000-0000-0000-F29F-58DDD4B1D23D" _position="0" _address="https://data.wa.gov/resource/x574-csgd/row-vfiw_wnzz~b6fi"><intent_id>653894</intent_id><project_id>743191</project_id><text_data>General Laborer: Hand shovel rock and asphalt (Laborer Union)Other Trucks: Lowbed - mobilization of equipment (Teamsters Union)</text_data><comment_date>2014-09-11T00:00:00</comment_date>